164
CHECKLIST CONSTRUCTION PERMIT __ PUMP INSTALLATION PERMIT WELL NAME or LOCATION : _·_._k.....:<;.;;..:_;.l_.: .- ...... '- """ •. , ...... ; .... k_;.; _1:.....,-:,._/_!_._/ ';_· __._..;.'i...t;___;;;:.) ------------- WELL NUMBER: !JL{L/f-7Tl:;ft;}_ L/i.ffi8 -0/, n2 I ·I OWNER or ADDRESS: I I I 2 k'; tv'.\ . 1/-, ·r I . ,, · I I · I q1 (11- 'v S , TELEPHONE(contact person): _______________________ __ Date application received ....................... Date acknowledged receipt/request more info .... . _.....:P...;.,ituZ::..:.I.,_/.t.-0.....:1 ______ __ Date application accepted ....................... _______________ _ Suspense date (90 days) ......................... Date filing fee deposited ....................... .. _________ Application sent to following: Dept. of Health County water board/dept HA.i f\ ! !h.\J Date sent ::J/' 0 4/gl _.!/ I X, e/z.i/'01 . ,!, :; I I ) Comments received Date agenda due ....................... ··········---------------- Date submittal due .............................. _______________ _ Date submittal sent to applicant ................ _______________ _ Date approved or __ disapproved ... __ Date applicant notified of decision ............. __ __ I REMARKS=--------------------------------------------------------

application~ i~· ,~:,~P~'~------€¦ · linda lingle governor of hawaii state of hawaii department of land and natural resources commission on water resource management p.o.box621

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: application~ i~· ,~:,~P~'~------€¦ · linda lingle governor of hawaii state of hawaii department of land and natural resources commission on water resource management p.o.box621

CHECKLIST

~WELL CONSTRUCTION PERMIT __ PUMP INSTALLATION PERMIT

WELL NAME or LOCATION : _·_._k.....:<;.;;..:_;.l_.: .-...... '- .~....1 """ •. , ...... ; .... k_;.; _1:.....,-:,._/_!_._/ ';_· __._..;.'i...t;___;;;:.) -------------

WELL NUMBER: !JL{L/f-7Tl:;ft;}_ L/i.ffi8 -0/, n2 I

·I

OWNER or OPERATOR:~\~.~~·.-~~~~·--------------------------------­ADDRESS: I I I 2 k'; tv'.\ ·~·iru . 1/-, ·r I . ,, ·

I I · I q1 (11-~·f·l • 'v S , TELEPHONE(contact person): _______________________ __

Date application received ....................... _~B~/wi~G~/~8~9L-~----Date acknowledged receipt/request more info .... . _.....:P...;.,ituZ::..:.I.,_/.t.-0.....:1 ______ __ Date application accepted ....................... _______________ _ Suspense date (90 days) ......................... _~~~~-------Date filing fee deposited ....................... _~g~/?~ .. ~1/~g~) ________ _

Application sent to following:

Dept. of Health County water board/dept HA.i f\ ! !h.\J

Date sent ::J/'0 4/gl ~ _.!/ I X,

e/z.i/'01 . ,!,

:; I

I )

Comments received

Date agenda due ....................... ··········----------------Date submittal due .............................. _______________ _ Date submittal sent to applicant ................ _______________ _

Date application~ approved or __ disapproved ... __ i~·_,~.....:,~P~'~------Date applicant notified of decision ............. _~qr/~27~/~P_'.....:r..;.s·_~,_.: __ __

I

REMARKS=--------------------------------------------------------

Page 2: application~ i~· ,~:,~P~'~------€¦ · linda lingle governor of hawaii state of hawaii department of land and natural resources commission on water resource management p.o.box621

CHECKLIST

WELL CONSTRUCTION PERMIT v/PUMP INSTALLATION PERMIT

WELL NAME or LOCATION: KO!-+-,ANAI\LI 2- ISLAND: l:io-wA-=L,J

WELL NUMBER: ______ L¥4~~S~~=---o~~=---------Tax Map Key: ___ ~~-~~~-0~~~'-D~I __ _

OWNER/OPERATOR: Firm Name WAN?-3:...\ l-+.l¥>ffsL\ tN.G. Contact PersonT .Ht:.i.Af':"> 'I hMeeom=-o Address V. o. "Bt.x. 11 \ z:zz.. f:CAMu~ 1-H 21<v743--cx.>Z...o

Phone ~~- ~ ~oe>

LANDOWNER: Firm Name ~ Contact Person ________________ _ Address ______________________ __

Phone. __________________________ _

D t 1 ' t' ' d .., I ~~ \qa \ a e app 1ca 1on rece1ve ·······················~~~~~~~~--~~ \_~ Date acknowledged receipt/request more info ••••• ________________ __ Date application accepted ••••••••••••••••••••••• ________________ __ suspense date (90 days) ••••••••••••.•••••••••••• ________________ __ Date filing fee deposited ••••••••••••••••••••••• ________________ __

Application sent to following: Date sent Comments received

Date agenda due ..................•......•....•.. ________________ __ Date submittal due .............................. ________________ __ Date submittal sent to applicant •••••••••••••••• ________________ __

Date application __ approved or __ disapproved ••• ________________ __ Date applicant notified of decision ••••••••••••• ________________ __

REMARKS:----------------------------------------------------------

Page 3: application~ i~· ,~:,~P~'~------€¦ · linda lingle governor of hawaii state of hawaii department of land and natural resources commission on water resource management p.o.box621

CHECKLIST

WELL CONSTRUCTION PERMIT ~MP INSTALLATION PERMIT

WELL NAME or LOCATION:~\Lo_-~l~~~~A~\~~=\~ _________ ISLAND: ~~~

WELL NUMBER: 44sB-o \ Tax Map Key: .-:]- 2_-0S: o 1

OWNER/OPERATOR: Firm Name NAJ\t'Sr\) ~A-t\ 1 \ NL;. contact PersonJ:~kfr5 y~~R Address Bo. ~x tllZ.:Z-'7.---~UE:LA • \-t\ tH;=et~ ~ ou2o

Phone gBs-~o

LANDOWNER: Firm Name ~~t...

----~~~-------------Contact Person ________________ __ Address. ________________________ _

Phone __________________________ _

Date application received ......•...............• 3-21-9/ ~ate acknowledged receipt/request more info .•..• ________________ __

Date application accepted ....................... ________________ ~ Suspense date (90 days) ......................... ________________ __ Date filing fee deposited ....................... ________________ __

Application sent to following: Date sent

<De:pt. of llealt!h VDept. of Hawn Home Lands ________ __ De~t/B~ e£ Wa~er SY~~l¥

y/Historic Preserv. Frog. HeelaYlea. wg #4i EQaaQ1 ·~~· P~~~~ Hf!~teo• ··~:ue:i.i.) v Q£1' 1(.1~ 0 "'_H;--, tl)(\ I I C\ h. [\ ..\J.o. \ r t_

Comments received

Date agenda due ................................. ________________ __ Date submittal due .............................. ________________ __ Date submittal sent to applicant •.....•......... ________________ __

Date application __ approved or __ disapproved ... ________________ __ Date applicant notified of decision ...•......... ________________ __

REMARKS: __________________________________________________________ __

Page 4: application~ i~· ,~:,~P~'~------€¦ · linda lingle governor of hawaii state of hawaii department of land and natural resources commission on water resource management p.o.box621
Page 5: application~ i~· ,~:,~P~'~------€¦ · linda lingle governor of hawaii state of hawaii department of land and natural resources commission on water resource management p.o.box621

·---·· \

Facsimile Transmittal '

Fax: 58 7- O,;Lt'~j

From: 4 ~ . ..J,I~'-=~"--~-D_a_tc_:_o_-1.=-~--=·()::....!::3~· ~-.,.-----~-­..:;_&--=e:_.LJ,..b.«:..,&'L/.A__*_#_ ... ...:...'I~t;;,j.,B~-...!:::o-!;d..::.;:__ __ ____;·_P~ag~: A

CC:

o Urgent pCfor Review 0 Please Comment D Please Respond

Notes: , v

, li.o.Jt I<J(t£1 II 4~r-!3 -oe::<. (;

Confidential • - . 0

A Water Development Joint Venture P.O. Box 56115. K:~.iluo-Kona, Hnwaii 967~5 • (808) ·Fax (808) 322-092!1

8~60 ~~E 808 L ~NIIII~O 113.IVM ~0~~

Page 6: application~ i~· ,~:,~P~'~------€¦ · linda lingle governor of hawaii state of hawaii department of land and natural resources commission on water resource management p.o.box621

'· ClllllmiiiiCI"'• ........... MtrM U.f!NIII CCwii-IJ. ,.0. 8Gitzt • ....,.,. HI ........... ...................................................... ,,s.. ... ts, ............ --.. .

.............. lllr ........... .-.,. ... ....-............... .... . _...,,........,........,... ......................... Q .... --............. , .............. lgr--. ............... ....-v-. ............ e-.. ft ,,., ... ...._ ...................... .., ... a. ......

;~=~~JIIIii=lll: .............. --........................... ., .... - 01 ....... J 'I JMID....,WIIIr.,_.a_ ... .,._ .. ' • u•lw-eD•tll ............ ___ ........... ., ......... .,, .. ,,._ .. .. ..., .,._ Qa:::s; r-. In_,...,._ .,. .....,.. • Illite x ••••- .._ ... .......... -..--................. .

S. ... _.., USIIII ................................ fiM II • f'llwiMI*.cJ .W.. ~-~Ci··- ....... ·· ....... c. ............. .,.,. ........ t .,-....-,

_ .......................................... 0. ... -.,,... ..... .:.ti'ftiiY

'· nw.-.iiiL :•:•~•:u:n::1:=f,•......,..,.,..,. o--'F..,.._..ct•.aild•,.._....,Qonlndion. ,....,,ill Jll 1

• • ... HWCIJ'II .................... , ........ _.. ......... llllud..lliln .................... •- ...,.. .... ..., ................. *'R-i!llild ....................... _ _....._ ........ , , ........ ...

..... ..,,..,.,...,_ ........................ 7J ,..,.. ................ , ..... ........ .. G),.............. f I o-. ........ .,_,........, ............ 'r111e(jllll1ipMIOII...,_ •

..... fl .. .._... A,.._ .. _,. ...................... Oiica_.,......,

........ -........... ........ ...... ,, .................... Qsjll dill it.-r .... ..

........... ,., -· IIWI'or ................... ...._ ..... ~ ... ..... .. ..................... ~ ................................ -...... ....,., . .,......,

................ in'tll ....... ,,S.1 .. '131ft .... .., ........ ., ...... .. 1D. Tha ... -.. ... 11 R,W Uftii_.,..,,.., .................. .,....._...,..._.___.IIIJiiftiC_,...__

......... ... ......... ,........., ............ ~ ................ lpfiiiQM.~ ................. ...... ........ ,...... .. .,. ., ................. ..... ·-·--------~ ctttJ~ o;.;,.;;;; lr

,

c-.

TOT~ P.02

8~60 ~~E 808 L ~NIIIIHO !13 .IVM ~0~~

Page 7: application~ i~· ,~:,~P~'~------€¦ · linda lingle governor of hawaii state of hawaii department of land and natural resources commission on water resource management p.o.box621

FROM:

TO:

BAUER, G. CHING, F. DANBARA, S. FUJII, N. GOODING, K.

l HARDY, R. HIGA, D. ICE, C.

__s:_ IMATA, R. JINNAI, R. KUNIMURA, I.

I NIT.

"'' COMMISSION ON WATER RESOURCE MANAGEMENT

DATE:

TO: •:·

__ ,~·ATHIAS, T. ~NAKAMA, L. -\f NAKANO, D.

. NISHIOKA, L.

_!:l OHYE, M. SAKODA, 1:::.

"2- SUBIA, S. SWANSON, S. UYENO, D. YODA, K.

I NIT:

SUSPENSE DATE:

FOR:

Approval Signature Information

(8/02)

PLEASE:

See Me Review & Comment Take Action Type Draft Type Final File Xerox __ copies

Page 8: application~ i~· ,~:,~P~'~------€¦ · linda lingle governor of hawaii state of hawaii department of land and natural resources commission on water resource management p.o.box621

LINDA LINGLE GOVERNOR OF HAWAII

STATE OF HAWAII DEPARTMENT OF LAND AND NATURAL RESOURCES

COMMISSION ON WATER RESOURCE MANAGEMENT P.O.BOX621

Mr. Guido Giacometti Hiluhilu Development LLC 62-1210 Kawaiehae Road Kamuela, HI 96743

Dear Mr. Giacometti:

HONOLULU, HAWAII 96809

January 31,2003

Pump Installation Permit Extension Request for Well No. 4458-02

PETER T. YOUNG CHAIRPERSON

MEREDITH J. CHING CLAYTON W. DELACRUZ CHIYOME L. FUKINO, M.D.

BRIAN C. NISHIDA HERBERT M. RICHARDS, JR.

DEAN A. NAKANO ACTING DEPUTY DIRECTOR

4458-02.let

This is in response to a phone call by Dale Stromquist of Wai' eli Drilling on January 31, 2003. Mr. Stromquist requested an extension of your Pump Installation Permit for the Kau Well 2 (Well No. 4458-02).' Your request is approved. Your new completion date shall be November 21, 2004. All other conditions of your permit apply. Please remember to sign and return a copy of the permit prior to beginning work.

If you have any questions, please contact Ryan Imata of the Commission staff at or toll-free at (Hawaii), (Kauai), (Maui), or

(Lanai & Molokai), extension 70255.

RI:ss

Sincerely,

DEAN A. NAKANO Acting Deputy Director

Page 9: application~ i~· ,~:,~P~'~------€¦ · linda lingle governor of hawaii state of hawaii department of land and natural resources commission on water resource management p.o.box621

BENJAMIN J. CAYETANO GOVERNOR OF HAWAII

STATE OF HAWAII DEPARTMENT OF LAND AND NATURAL RESOURCES

COMMISSION ON WATER RESOURCE MANAGEMENT P.O. BOX621

Mr. Guido Giacometti Hiluhilu Development LLC 62-1210 Kawaihae Road Kamuela, HI 96743

Dear Mr. Giacometti:

HONOLULU, HAWAII 96809

NOV 1 6 2000

Pump Installation Permit Application for Well No. 4458-02

TIMOTHY E. JOHNS CHAIRPERSON

BRUCE S. ANDERSON ROBERT G. GIRALD BRIAN C. NISHIDA DAVID A. NOBRIGA

HERBERT M. RICHARDS, JR.

LINNEL T. NISHIOKA DEPUTY DIRECTOR

4458-02.ack

We acknowledge receipt, on October 28, 2000, of your completed Pump Installation Permit application and filing fee for the Kau Well #2 (Well No. 4458-02). You can expect your application to be processed within ninety (90) days from this date.

For your information, the process of constructing a well is normally regulated and permitted in two (2) steps. First, a well construction permit is issued for drilling and testing purposes only. Based upon information provided by you through a Well Completion Report Part 1 (Well Construction), a pump installation permit (upon completed application) may then be issued to authorize pump work. If a pump is installed then a Well Completion Report Part 2 (Pump Installation) is required.

If you have any questions about your permit application, please contact Ryan lmata of the Commission staff at or toll-free at (Hawaii), (Kauai), (Maui), or (Lanai & Molokai) extension 70255.

Rl:ky

Sincerely,

~a;t LINNEL T. NISHIOKA Deputy Director

/

Page 10: application~ i~· ,~:,~P~'~------€¦ · linda lingle governor of hawaii state of hawaii department of land and natural resources commission on water resource management p.o.box621

BENJAMIN J. CAYETANO GOVERNOR OF HAWAII

TIMOTHY E. JOHNS CHAIRPERSON

TO:

FROM:

STATE OF HAWAII DEPARTMENT OF LAND AND NATURAL RESOURCES

COMMISSION ON WATER RESOURCE MANAGEMENT P.O. BOX621

HONOLULU, HAWAII 96809

Honorable Bruce S. Anderson, Director Department of Health Attention: Dennis Tulang, Wastewater Branch

William Wong, SafectiSri in~ Wa~r Branct1-, ,. · I OY\- I Timothy E. Johns, Chairperson .

Commission on Water Resource Ma m ~~ , t

BRUCE S. ANDERSON ROBERT G. GIRALD BRIAN C. NISHIDA DAVID A. NOBRIGA

HERBERT M. RICHARDS, JR.

LINNEL T. NISHIOKA DEPUTY DIRECTOR

SUBJECT: \

Pump Installation Permit Application Kau Well #2 (Well No. 4458-02)

Transmitted for your review and comment is a copy of the captioned well application.

We would appreciate your comments on the captioned application for any conflicts or inconsistencies with the programs, plans, and objectives specific to your department. Please respond by returning this cover memo form by November 29, 2000.

Please find the attached maps to locate the proposed well. If you have any questions about this permit application, request additional information, or request additional review time, please contact Ryan lmata of the Commission staff at

Rl:ky Attachment( s)

RESPONSE:

[ 1

[ 1

[ 1

[ 1

[ 1

[ 1 [ 1

This well qualifies as a source which will serve as a source of potable water to a public water system (defined as servin!) 25 or more people at least 60 days per year or has 15 or more service connections) and must receive Director of Health approval prior to 1ts use to comply with Hawaii Administrative Rules (HAR), Title 11, Chapter 20, Rules Relating to Potable Water Systems, §11-20-29.

This well does not qualify as a source serving a public water system (serves less than 25 people or more people at least 60 days per year or 15 service connections) and if the well water is used for drinking, the private owner should test for bacteriological and chem1cal presence before initiating such use and routinely monitor the water quality thereafter. However, if future planned use from this source Increases to meet the public water system defimtion then Director of Health approval is required prior to Implementation.

If the well is used to supply both potable and non-potable purposes in a single system, the user shall eliminate cross-connections and backflow connections by physically separating potable and non-potable systems by an air gap or an approved backflow preventer, and by clearly labeling all non-potable spigots with warning signs to prevent inadvertent consumption of non-potable water. Backflow prevention devices should be routinely inspected and tested.

It does not appear that this well will be used for consumptive purposes and is not subject to Safe Drinking Water Regulations.

For the applicant's information, a source of possible wastewater contamination []is [] is not located near the proposed well site (information attached).

Other relevant DOH rules/regulations, information, or recommendations are attached.

No comments/objections

Contact Person: _________________ _ Phone: ______ _

Signed: ___________________ _ Date: _______ _

Page 11: application~ i~· ,~:,~P~'~------€¦ · linda lingle governor of hawaii state of hawaii department of land and natural resources commission on water resource management p.o.box621

BENJAMIN J. CAYETANO GOVERNOR OF HAWAII

TO:

FROM:

SUBJECT:

STATE OF HAWAII DEPARTMENT OF LAND AND NATURAL RESOURCES

COMMISSION ON WATER RESOURCE MANAGEMENT P.O.BOX621

HONOLULU, HAWAII 96809

Dean Y. Uchida, Administrator ~ Land Division ~r--.. · ~

Linnel T. Nishioka, Deputy Director 1 U---Commission on Water Resource Managem nt

Pump Installation Permit Application Kau Well #2 (Well No. 4458-02)

TIMOTHY E. JOHNS CHAIRPERSON

BRUCE S. ANDERSON ROBERT G. GIRALD BRIAN C. NISHIDA DAVID A. NOBRIGA

HERBERT M. RICHARDS. JR.

LINNEL T. NISHIOKA DEPUTY DIRECTOR

Transmitted for your review and comment is a copy of the captioned well application which includes a request for a pump installation permit.

We would appreciate your comments on the captioned application with regard to the programs, plans, and objectives specific to your division. Please respond by returning this cover memo form by November 29. 2000.

Please find the attached maps to locate the proposed well. If you have any questions about this permit application, request additional information, or request additional review time, please contact Ryan lmata of the Commission staff at

Rl:ky Attachment{ s)

RESPONSE:

[ ] A water lease/permit is required of this applicant and an application for such will be requested by our division.

[ ] A water lease/permit is not required of this applicant.

[ ] A water lease/permit has been obtained by the applicant through lease no. -----------

[ ] Other relevant Land Division rules/regulations, information, or recommendations are attached.

[ ] No objections

[ ] Other comments:

Contact Person: _________________ _ Phone: ______ __

Signed: ___________________ _ Date: _______ _

Page 12: application~ i~· ,~:,~P~'~------€¦ · linda lingle governor of hawaii state of hawaii department of land and natural resources commission on water resource management p.o.box621

HILU HILU DEVELOPMENT, LLC 65-1210 KAWAIHAE RD, 2ND FL

KAMUELA, Hl96743

PAY TO THE Department ofland & Natural Resources

RRST HAWAIIAN BANK KONA, HI 96740

59-101/1213

ORDEROF ________________________________________________________________ ~

9/14/2000

$ **25.00

Tvventy-Fiveand00/100*************************************************************************************************

1324

-------------------------------------------------------------------------------------DOLLARS Department of land

& Natural Resources

Well pump installation permit applications-MEMO ____________________________________ __

DEPAATMENT OF l.JIN) PHJ ~T~ RESOlRCES

-

fn Security features included. Details on back.

X>C\.ME_NT Nl. ~C OR ATIA0£0 ~RKSt-£ET DATE: NOV 1 6 2000 SRC/ COST

F YR N'P 0 OBJ CTR PROJECT PH ACT Al-t)l.NT NAME/DESCRJPTJON.(WANG INPUT)

s 0 326 Ci 102( 075 (1) $25.00 Hilm Hilu Development, LLC - -- --- --- ---- ----- -- --- -------------------- -- --- - ---- ---- ----- -- --- (2) --------------------- -- --- - --- ---- ----- -- --- (3) ------------:----------- -- --- - ---- ---- (4) ------ -- --- --------------------

TOTAL ~,~.QQ

RtMO.RKS: Lito£ (1) PIP Appl. for Well No. 4458-02 (Kau Well #2) i

LINE (2) I

LINE (3) '

LINE (4) I I --·----- ---- --

Page 13: application~ i~· ,~:,~P~'~------€¦ · linda lingle governor of hawaii state of hawaii department of land and natural resources commission on water resource management p.o.box621

~MISSION ON WATER RESOURCE MANAGEME~ ROUTE SLIP FOR NEW APPLICATIONS

FROM: RYAN

BAUER, G. CHING, F. FUJII, N.

-1-HARDY, R. ~ HIGA,D. ~

5

HIRANO, E. ICE, C. IMATA, R. JINNAI, R. KUNIMURA, 1.-

DATE:

LUM,A. NAKAMA, L. NAKANO, D.

-3-NISHIOKA, L. -4-0HYE,M.

SAKODA, E. -2-SUBIA, S.

SWANSON, S. UYENO, D. YODA, K.

WELL NUMBER Lf4~ ~, 9 3 -4. ~ WELL NAME

SUSPENSE DATE:

PLEASE:

3 Approval See Me 3 Signature =y Information

't 1 · \;c .._.·~~

-1-Review & Comment Take Action

-5-Type Draft acknow letter -2-Type Final, label new file folder -5-File --Xerox copies

-----------------------------------------0 WELL CONSTRUCTION [Z' PUMP INSTALLATION

ATTACHMENTS FOR APPLICATION 1 TRANS. LETTER ~ 2CWRMMAP ~ 3 APPL. FORM (3X) :.,/ 4 USGS MAPS (3X) --;;r-5 TAX MAPS (3X) ~ 6 PARCEL OWNER VERIF.=z:MLSPRINTOUT 7 CONTRACTOR VERIF. __ ._,_ -- ! : f -z., "'~ • ''\ 8 ALL INFO FILLED IN ,J 9 BACKGOUND CHECK --

FOLDER: 0 MADE NEW FILE FOLDER, ATTACHED [l] FILE FOLDER ALREADY MADE, IN FILE CABINET

INCOMPLETE ACTION DATES:

ACTION

e "' 1'11\.t?. ; iLJ.

I .r;..,.:

I

e utS • ....J)-~. e-~~~ ~ AMYC--: 1~, h::. · • y.;'itlo Sw·~ =J'-L~,o~ · ~ ~t-~k. 1i to/-vt.)e>o

Page 14: application~ i~· ,~:,~P~'~------€¦ · linda lingle governor of hawaii state of hawaii department of land and natural resources commission on water resource management p.o.box621

/ 45r v

44

43

/(

• 1

l

}l,fJ,!i!W-\liS>'~'

v~.~r.--~"~t w~:'

r ..

\M AKA :i '"'"""""'"

"'··

'01 0

I

·J( . ·. I . ~ ~:·'rl

Kohanaiki 2 Well Well No. 4458-02

~-·~····-"'=ch-::c::-;;-;;r-:"T:=-t-= .Jl.;..~~:;!:J,..~"!'"::::-;":---.---,--.=.~T"-.. ---~-:,...J ij <.llit.t': $'! 1!:: ~ 1.1~·

. ; • , Q··• j.£-~c~]"·

1)\ ALA,~IA

.• / ,.

A L ..... '. () I

A

;,

)• ft.~

.:. :G

•..

..

•·

r;.d't:''~:s;V-'i!'~~~irf ~-!.- -t~,·.<-• i!ALAI.JiJ; .. H ~lt tl:rt·t;A I";·

, ~"""'T"~.,

/

~ f<v~~ l

...,.:

Page 15: application~ i~· ,~:,~P~'~------€¦ · linda lingle governor of hawaii state of hawaii department of land and natural resources commission on water resource management p.o.box621

STATE OF HAWAII/ DEPARTMENT OF LAND AND NATURAL RESOURCES I COMMISSION ON WATER RESOURCE MANAGEMENT GROUND WATER WELL INDEX I SUMMARY

Thursday, November 02, 2000

ISLAND CODE 8

Aquif Well No. Well Name Code Owner/User

4458-01 Kohanaiki 1 80901 Nansay Hawaii

4458-02 Kohanaiki 2 80901 Nansay Hawaii

4459-01 Huehue Ranch 2 80901 Huehue Ranch

4459-02 Huehue Ranch 4 Huehue Ranch

Coordinates Initial

Total Bottom Bottom Bottom . Year Case Depth Solid Perf of Hole Static Specific Drilled Latitude Longitude Type Dia in. ft. Ground Casing Casing Head Cl- Temp Capacity

1991 194422 1555851 ROT 14

1991 194408 1555854 ROT 18

1991

1992

194448 1555910

194457 1555907

PER 14

ROT 14

1952 1799

1880 1800

1642 1537

1625 1532

7

-10

0

-3

-43 -153 9.9 35 22.2 304

-50 -80 10.2 15 25.8 400

-25 -105 7.3 63

-33 -93 7 110 23.8 1100

Installed T Capacity Use

.720

.720

Page 1 of 1

(

UNU

UNU

UNU

Page 16: application~ i~· ,~:,~P~'~------€¦ · linda lingle governor of hawaii state of hawaii department of land and natural resources commission on water resource management p.o.box621

Search Results

Copyright 10/31/2000 by Hawaii Information Service

Assessed Values reflect the year 2000 .

• PUBLIC RECORD DATA TMK # 3-7-2-5-1

Owner: HILUHILU DEVELOPMENT LLC

Page 1 of 1

Tax Payer: HILUHILU DEVELOPMENT, LLC Tenure: Fee Simple Tax Bill: 65-1210 KAWAIHAE RD 2ND FL, KAMUELA, HI96743 USA Semi-Annual Tax: $10,387.50

Assessed Value Exemption Size Buildings: 0 Dwellings: 0 Land: $2,077,500 $0 999.03 ac PITT Code: 500 Zoning: A-3A

Buildings: $0 $0 0 sq ft Land Use: 0 Nbhood Code: 7283 Total: $2,077,500 $0 Subdivision: Makalei Estates

SALES 6/13/1988 DEED $5,250,000 B/P 22026/633

HALE 0 KAU 6/30/1989 DEED $13,300,000 B/P 23351/703

NANSAY HAWAII INC 4/8/1999 DEED $4,600,000 Doc 99-054108

K W KAU LLC , A Company or Corporation 6/25/1999 DEED $4,600,000 Doc 99-101969

HILUHILU DEVELOPMENT LLC , A Company or Corporation

This information has been supplied by third parties and has not been independently verified by Hawaii Information Service and is therefore not uaranteed.

http:/ /webresearch.hawaiiinformation.com/REsearchl Asp/Functions/Property /Search TMK.a 1 0/31/2000

Page 17: application~ i~· ,~:,~P~'~------€¦ · linda lingle governor of hawaii state of hawaii department of land and natural resources commission on water resource management p.o.box621

Well Background Check Well Construction Pump Installation

Approved Well No. Well Name Applicant Driller Type Issued Signed WCR1 Accept Issued Signed WCR2 Accept

4459-04 Kau 2 HiluHilu Development LLC ABC-15060 PUMP

1/4/2000 4459-05 HiluHilu lrr 3 HiluHilu Development LLC C-16543 WELL 1/1212000

1/4/2000 4459-04 HiluHilu lrr 2 HiluHilu Development LLC C-16543 WELL 1/121200~ 1/4/2000 4459-03 HiluHilu lrr 1 HiluHilu Development LLC C-16543 WELL 1/1212000

()

Tuesday, September 19,2000 Page 1 of1

Page 18: application~ i~· ,~:,~P~'~------€¦ · linda lingle governor of hawaii state of hawaii department of land and natural resources commission on water resource management p.o.box621

~ ~~~~-------------------, State of Hawaii For Official Use Only:

COMMISSION ON WATER RESOURCE MANAGEMENT Department of Land and Natural Resources APPLICATION FOR PERMIT D Well Construction and/or

Instructions: Please prinl in ink or type and send completed app ication with attachments to the Commission on Water Resource Management, P.O. Box 621, Honolulu, Hawaii 96809. Application must be accompanied by 3 copies and a non-refundable filing fee of $25.00 payable to the Dept. of Land and Natural Resources. The Commission may not accept incomplete applications. For assistance, call the Regulation Branch at For further information and updates to this applicatio~ form, visit http://www.state.hi.us/dlnrlcwrm.

,.., r <:'; '" 15 l:J ~....- Uo~-. t

APPLICANT INFORMATION: (Fill out all three, if applicable, and place a check next to the primary contact) ' . : .. : ... ' ..

1. (a) D WELL OWNER:" \lU \-\lt..\t '\)~Vt'l..· \.lCcontact PersonG.GI"Cot-16'1" p Phone: -~£e,gz-( 9Z4-MailingAddress:G;1.-I'210 K ""WA1~ f2c•M:~

1 Kbrtt&A6'f.-J, HI q(e,"f, 3

Fax: ~~2~l'J24i E-mail: %tDO@. I?~Ao, )-I~T (b) D LANDOWNER: l-\\t.IA\:\:U.A-' Di\le'L LLC Contact Person: I • SM I nt Phone: eo6/~7 ~004~

Mailing Address: b'l.·IZIO ~'<78-Pre 1<:-DA:Z>, K~Ue"C-A1 !}t G:lfb74 3 Fax E-mail: TY'L~"?. @ L.A\JA· ~~

(c) 0 CONTRACTOR:I:::"el!WUtu ~oN-. eo ..... R Contact Person: Wt-t DE6raru; Phone: 32"i'· 0 I ~q MailingAddresl ·po 'BDJ' 9007 K~I..Ut).- k:C....,A 1 HI CfbJ~S Fax: G!cl!Jf-"3'Z-"i- {pf.,CIS E-mail: Lic#:A'BC. -- I 60~0

(circle onP.: C-57. C-57a. or A\

WELL & PUMP INFORMATION: (Please fill in the diagram on the back of this form.)

2. WELLNAME: \<AV\ Wrc.~L ~ '2. Island:

Address _!]_._'£_.05 Ol k ~ 1

'Nol?.nt \l.o..._.a.., H-\ Tax Map Key: Zone Sec Plat Parcel

Attach the relevant portion of (a) a 7.5-Minute Series USGS topographic map (scale 1 :24,000) and include the name of the quad map, and (b) a property tax map, showing well location referenced to established property boundaries.

3. PROPOSED WORK: D Construct New Well (check all that apply)

0 Modify Existing Well'

o Abandon/Seal' /;>W ~nstall New Pump•

0 Modify Pump•

'State Well No.: 4Yk:f71. .-o~ ..

__ "i.i" __ V _____ (if unknown, please call Commission at

4. CONSTRUCTION: )(Drilled 0 Dug 0 Shaft 0 Tunnel

Is this well part of a battery of wells? DYes ~o (Please describe)

5. PROPOSED PUMP INFORMATION: Rated Pump Capacity: ___ t"J-L5""'-'0"'----- gallons per minute

Pump Type (Check one):

~eep Well Turbine

0 Submersible

0 Rotary

0 Rotary-Displacement

0 Rotary-Gear 0 Centrifugal

6. PROPOSED USE: (check all that apply)

)!(Municipal (including hotels, stores, etc.)

0 Domestic (individual, noncommercial water system)

0 Irrigation (crop) ------------

0 Military

0 Propeller

0 Reciprocating

0 Impulse

0 Industrial

0 No. of Dwelling Units:

0 No. of Acres:

0 Other (explain):

7. (a) PROPOSED AMOUNT OF 'WITHDRAWAL: I 117001 000 gallons per day

(b) METHOD OF FLOW MEASUREMENT: )(r1owmeter D Open-pipe D Weir D Orifice D Other(explain)

OTHER IMPORTANT INFORMATION:

8. LEGAL REQUIREMENTS:

9.U2MARKS, EXPLANATIONS:

b(rt;fl.. Surrt.."f,

0 COUP 0 SMAP 0 EIS 0 EA

(if more space is needed, please attach additional sheet)

)(,None 0 Other (explain)

T't' '8:ri t> F-

1 understand that approval of this application attaches the following standard conditions: 1) the proposed work is to be completed within two (2) years of the approval date; 2) the contractor shall submit to the Commission a well completion/abandonment report within 60 days after the completion date of the permitted work; 3) monthly water use data shall be submitted to the Commission; 4) such approval shall not constitute a determination of correlative water rights and shall not guarantee the pump capacity or future use up to the permitted pump capacity.

/

Well Owner Nu."tr'LU ~ LL( Landowner HtLu{hUI. Dw L LC Contractor k'l11rtlrt-c ~ W5'rL.

/

A g. ~I

·,' \: ' , --'

Signature

Date

~ - ,11!1 ;fA~ignature '"?22r - . /1t , "~ignature ~- 1/tt'(~j>,-4.!!1,~ _/ "Y/t: &- Date

For official use only Latitude Longitude

Aquifer System No. State Well No.

9'/,~/,, Date p/ 'Y/,t~

WCPIPA Form 7113100

Page 19: application~ i~· ,~:,~P~'~------€¦ · linda lingle governor of hawaii state of hawaii department of land and natural resources commission on water resource management p.o.box621

10. PROPOSED WELL SECTION (Please attach schematic if different from diagram provided below)

Hole Diameter: ____ in.

Elevation at top of casing ---ft., msl"lt="_.·_·.·: I:-·:,.'·.·. { · I ~~~yue~ ~~ ~~:~ed~~~-~ 14~;hick Concrete Pad (to contain benchmark

d1 Pf:i r Ground Elevation: ____ ft., mst•

ij-""\ '!-"'<" '!-""'\

~.:~· :~)· Cement Grout: ft.

(min. 70% of distance from ground elevation to top of water surface or 500 ft., whichever is less.) f--

Annular space between hole and casing (min.3"):

in. ~v~ ~====:::: ., .... r-- f- .. .:..

Rock or Gravel Packing:

ft.

... ~-Please refer to the

HAWAII WELL CONSTRUCTION AND PUMP INSTALLATION STANDARDS to ensure thai your as-built is in compliance

with applicable standards.

Solid Casing: (;, 90% x (Ground Elev.-Water Level Elev))

Total Length: ft.

Nominal Diameter: ___________ ,in.

Wall Thickness: in.

Bottom Elevation: ft., msl'

Open Ccsing: D Perforated UScrean Total Depth

___ ft. Material: Total Length: ___________ ft,, 0 Crushed Basalt

~::O::R=o=u=n=de:d::G:ra=v=e=l==~~~ ~~~~~~-----~ Nominal Diameter: __________ _:in.

Wall Thickness: ___________ ,in.

Estimated Water Level

Elevation:

Bottom Elevation: ft., msl"

____ ft.msl' '-'-- -f..

note: Neither bentonite nor mud should be used in

saturated zone during drilling

Open Hole:

Length: _____________ f,t.

Diameter: ______________ ,in.

- --'~

• The approximate elevation must be referenced to mean sea level (msl) at the time of application filing. Final elevations of well components shall be submitted in the Well Completion/Well Abandonment reports and referenced to a benchmark which has been established by a surveyor licensed by the State.

Bottom Elevation:---------

For non-salt water Basal Wells - bottom elevation of well should not be deeper than 1/4 of aquifer thickness or,

Bottom Elevation of Well Limit= {Water Elevation. 41 x Water L~vel Elevation)

Example: Estimated+ 2ft. Water Level Elev. ---+-Bottom Elevation of Well Limit= ( 2- ~) = -18.5ft.

Solid Casing Material: ::arbon Steel: compiiant with (cneck one or more):O ANSI/AWWA C200 0 API Spec. 5L ll ASTM A53 U ASTM A 139

And compliant with (check one or more): 0 ASTM A242 0 Type E 0 TypeS 0 Grade B 0 Other

Stainless Steel: (check one): 0 ASTM A409 (production wells) 0 ASTM A312 (monitor wells)

ABS Plastic conforming to ASTM F480 and ASTM D1527: (check one) 0 Schedule 40 0 Schedule 80

ft.,msl"

PVC Plastic conforming to ASTM F480 and (ASTM D1785 or ASTM D2241): (check one): 0 Schedule 40 0 Schedule 80 0 Schedule 120

Thermoset Plastic: (check one)

Open Casing Material:

0 Filament Wound Resin Pipe conforming to ASTM D2996

0 Centrifugally Cast Resin Pipe conforming to ASTM D2997

U Reinforced Plastic Mortar Pressure Pipe conforming to ASTM D3517

0 Glass Fiber Reinforced Resin Pressure Pipe conforming to AWWA C950

0 PTFE Fluorocarbon Tubing conforming to ASTM D3296

0 FEP Fluorocarbon Tubing conforming to ASTM D3296

Carbon Steel: compliant with (check one ormore):OANSI/AWWA C200 OAPI Spec. 5L OASTM A53 OASTM A139

And compliant with (check one or more): 0 ASTM A242 0 Type E Q TypeS Q Grade B ll Other

Stainless Steel: (check one): 0 ASTM A409 (production wells) 0 ASTM A312 (monitor wells)

ABS Plastic conforming to ASTM F480 and ASTM D1527: (check one) 0 Schedule 40 0 Schedule 80

PVC Plastic conforming to ASTM F480 and (ASTM D1785 or ASTM D2241): (check one): Q Schedule 40 Q Schedule 80 Cl Schedule 120

Thermoset Plastic: (check one) Q Filament Wound Resin Pipe conforming to ASTM D2996

Q Centrifugally Cast Resin Pipe conforming to ASTM D2997

Q Reinforced Plastic Mortar Pressure Pipe conforming to ASTM D3517

Q Glass Fiber Reinforced Resin Pressure Pipe conforming to AWWA C950

Q PTFE Fluorocarbon Tubing conforming to ASTM 03296

U FEP Fluorocarbon Tubing conforming to ASTM D3296

Page 20: application~ i~· ,~:,~P~'~------€¦ · linda lingle governor of hawaii state of hawaii department of land and natural resources commission on water resource management p.o.box621

SEP-14-00 10,52 FRQM,WITCHER ENGINEERING .. LLP 10,18083340831 PAGE 2/3

1

I

--r-----~---4---J...-------13'

1760 Ft.

1810 Ft. 1880 Ft.

"'-+--t--8" PUMP CCX..UMN

....,_-r--1 '-()" 1.0. WELL CASING

CEMENT GROUT <24" MINIMUM>

.l-.------t'JZ~~~- GROUT SEAL

STATIC Wl •15 aEV.=+40 rt.

ELEV.=-10 Ft.

ORILL HOLE GRAVEL PACK

SOLID CASING {STEEL. 0.375" WALL}

~-- PUMP ASSEMBLY

S9.5 Ft.

l__:~F-t_.~E~LE~V~.=-~~~OF_t.~v-~H SCREEN CASING <STEEL· 0.3125~ WALL>

30Ft.

CASING GUIDE ISEE DETAILO

e" SHROUD

l ELEV. "'-SO Ft. v ,_ 1' -5.5"

·-·--""''"T'--L----·-----........ ---~~;_;,~: kAu LU~t- ~ z_

tiJ,r~ ~v•J-1~~ LlP ~sT£<.-tt.flPJ..~ t1.--~

SECTION SCALE: 1/Z" ..

c -:------

Page 21: application~ i~· ,~:,~P~'~------€¦ · linda lingle governor of hawaii state of hawaii department of land and natural resources commission on water resource management p.o.box621

..

2186000m N.

UNITED STATES DEPARTMENT OF THE INTERIOR

GEOLOGICAL SURVEY

(

f\ALA,OA•

\OOMA

Ob \

~' ; p \ \, I\ oo / ._ \ : I to -._"()~~.-s·_.

I -, ,I I

42'30'-'- . ~' '

Page 22: application~ i~· ,~:,~P~'~------€¦ · linda lingle governor of hawaii state of hawaii department of land and natural resources commission on water resource management p.o.box621

I ~

\

i

LEGEND

®. S.,cr;on Numb«

-··- Sccriou Bounduy

NORTH KONA. H,,t-••iAII

.. .. - - - - • • - II II II -· (Srr /~•'''

1443

Page 23: application~ i~· ,~:,~P~'~------€¦ · linda lingle governor of hawaii state of hawaii department of land and natural resources commission on water resource management p.o.box621

... ----~· •. J~ 31 '00 12:33 FROM:TNWRE

' .. + T-766 P.Dl/09 F-350 ~ .............. ____ _

I I •·I ' !I" ':·I I ·I' • ·""-" ......,

r·t ·nt ·I! ·· • ·u· ·"' · .,. ·~• ... ,.,. .... ,~1nr•• 1 ,..,. ,.. .......... ,,,.c;" Tom Nance Wau::r

... ~ ... a Re&ouroe Engineering

To:~~~-~~--==~~--=~--:-~c_w_~------onJiu) 0 _,11 Ii}111i11 not be nwled 10 YDII.

From: ---~rn_om~_?/j-=-anc._e _______ _

Facsimile Header

Fu No.: --===--'--~--Dale: ~.~,~~

No. or Paps; ~ (mcludins ~) Subjea;_--5L.~~~JS?~M&~A..III:....1.1tJ:.::I,;~~~~~~:..:::;::;._:~~~----------

1M w~-, <f:A ) " / {! i ------

Page 24: application~ i~· ,~:,~P~'~------€¦ · linda lingle governor of hawaii state of hawaii department of land and natural resources commission on water resource management p.o.box621

. ~All 31 I 00 12:33 FROM: TNWRE +808-538-TTST T-TSS P.02/09 F-350 ... '~ • n-ov. t.. t~!:IJ tu: tlAM ~:-"~~ ~un 111 ltiUlSJ ~44-HJY~ JIO. l4U"I J', L/Y

_..,.

MEMOUNDUM OF UNDEil.S TANDlHC BETWEE!J KAUJU. KEA PROPRTl:!:S I INC. I HAUNA J..ANI R.ESOll.T' IJIC ••

NANSAY HAWAII, INC. AND WAIXOLOA LAND COKPABY ON COOPERATIVE REGIONAL WATER DIV!LOPMEIT

Mission Statement

To work jointly and cooperatively in developing and implementing a regional water plan which beat serves the collective water needa of the parties and others within the

- • ·- - ·-- --- u reaion· in a manner·· ac~eptable--·to· relevant·- govermaent;al- -- --------------authorities.

(]bject:iye,s

The parties to this Hemorandu. of Und•ratandins (collectively referred to as "South Kohala Water Study Group" or ''Croup") ac:knowlcd.se and agree th&t it ia in their long-te~ best interftat• to achieve the Mission set forth abova in the follow1na .ann•r;

0

0

0

~each &&~e~Rt op a ~esion&l plan fa~ the developaant of aources and distribution aystems fo~ potable, non-poeable wate~ and effluent reuse;

For. and eatabliah, aa eQuity participant•• a p~~v•~•. ~&ional wat~~ cqmpaU,T o~ ~~&Qie• for tba development 1 production, distl'ibution and ••l• of pot•ble, non·pot&ble and offlP~t reuse resou~ces serving the partiea and others within ~he regioni

Reacb bilateral and ~ltilateral aare&.anta achi.avi.na the ataaed illlpleaentaticm of the reaional water ~lan;

Publicly support and consider tba e~taent to the conditional. Fartial funding of the County of Hawaii Department of Water·supply'a (DWS) dav•lopment of its planned North ~ohala Pipeline;

Develop a Water Commitment Policy, whiCh 11 incorporated herein by references containing auidelines and requirements for ~ach Group Member aecurina a sufficient 1upply of wat~ for aetual use in accordance with & realistic timetable;

Page 25: application~ i~· ,~:,~P~'~------€¦ · linda lingle governor of hawaii state of hawaii department of land and natural resources commission on water resource management p.o.box621

. JAN 31 '00 IZ:33 FROM:TNWRE .«••.t.,I.J\Jv IU•IC.I\a

0

0

~""" 'lVII 111 \UUUJ J't't UJ\Jv

..........

+

·-"'

T-766 P.03/09 F-350 llll, G'iUI r. J/:1

Coordinate the activities of the Water Study Group with all relevant State of Hawai1 autbo~ities. including but not limited to it$ Water Commission, in a manner which promote• and preserves the Group's ability to deal with regional water issues on a collective basis;

Communicate, where appropriate, with other interested partial within the reeion;

• • n. - • - -- -- -· ••••••••••• - ....... -- g- .. - E"ntei'-- iiito--tfubsequent:- :]"cfint -a.s:teet;ents-rn-e-ena-ea----- ------to implement the objectives adopted herein.

Governance

The activities of the Group shall be aoverned and coordinated throush an £x•cutive Co~i~tee comprised of a desianatad representative of e~ch signatory to this Meaor~dua of Understanding.

the Group Executlve Cmamittee &ball:

0

0

0

Approve all pol!~tfta, as~eeaen~s and expenditures made on behalf af the Group; provided. thar lf ~h• rep~esent•rtv~ Qf any Group member specifically diaapprovea of any such azpenditure, that Group anamber shall be exeqsed froa its pro rata share of sucm A%p8Qditure;

Approve the inclusion of anditional maabers to and approve, except member in quest:l.on, for the exclusion of existins members froa the Water Study Group; ·

Approve public stateaeuta and testiaony ~esa~dina Wate~ Study Group acti~tias;

Develop an4 approve an annual operatina budget, project budget• and the indiv~dual party's obligations to fund the operation& and the development of theBe planned projects;

Ba k•pt info~ed of all aareement£ entered into between Water Study Croup members affectins the G~oup'e Mission and Objectives;

Coordiu.te &11 contact regardins the activit~es of the Water Study Group with gove~antal agencies;

.. 2-

Page 26: application~ i~· ,~:,~P~'~------€¦ · linda lingle governor of hawaii state of hawaii department of land and natural resources commission on water resource management p.o.box621

. · .lAft 31 '00 12:33 FROM:TNWRE +808-538-71~7., T-76& P.04/09 F-350

. .nov. '- 1:~:~J. 1u: 1JAA ,. . • ftO. £4 u '--· (._...4/ L ~ ~-.

0

D

Direct and approve the activitie& of all consultants reca1ned by the Water Study Group relatina to its stated Mission and Objectivea.

All deei1iona of the Group ahall be by the maJor1ty of the membera of the EKecutive Committee QXCept fo-,; "key decisions" which requtra unani•ous approval. Xey dec1a1on include approval of the annual op~ratins budset and 1n41v1dua1 mambAra obl1aatioQ to fund

+

. - operations or make- -contributions -to~he--- ------·---­d•velopment of planned projeta. exp•nditures which are outside of the appraved budget in excess of $5,000 in any single caae o~ $25,000 in the aggregate and the aclc!itioti of any new .. member to the Executive Committee.

Dispute tesolution

It ia acknowledaed that froa time to tiaa, disputes and diaaareements aay aris• between the parties to this Memorandum of Undar•tanding resardina ra&ional water issues and that it ia in their loua-te~ collective best interests that suCh disputes be resolved without resort to aovernmental or Judicial involvament.

The parties agree that they shall use tbei~ individual and collective best efforts to reaolve any and all outltandina; issues covered by this tta.o~a:pdn•. 'rhe parties further aarae tha~ in the event aegotiations fail to reault fn accept•ble asreement or resolution, they .ay voluntarily submit outatanding issue(s) to bindina o~ nanhinding a~bit~ation pursuant to ;-~ &greed to by the parties.

Korth Kohala Pipeline

The parties aaree to support the concept of a North Xoha1a pipeline t~anapo~ins potable water to &outh Kobal& beinB pursued b7 the Depart~ent of Water Supply, Countr of Ho.wa:l.i.

In the event that the parties are reasonably aatiafied that the North Kohala pipeline will ba built, but no later than tbe :stA~t of C::QJ\.at+Uctl.on, individual signato~1es to this agreement shall commit, au a fair and equitable b4sis, to tha pa~tial fun4ing of ~a14 p1p•l1ne under acceptable te~s and conditions to be negotiated.

~3-

Page 27: application~ i~· ,~:,~P~'~------€¦ · linda lingle governor of hawaii state of hawaii department of land and natural resources commission on water resource management p.o.box621

' . . · JAil 31 '00 12:3( FROM:TNWRE ,_.,·J,, c.. '"""' &u. '"'n. ft~ IVJ' IU \UUUI \l't't U.l:l:l

~

+808-538-TTST ~ .. T-76& P.05/09 F-350

aU, LllU I r, 'J/ :f

Termination/Withdrawal

A aajority of the members of the Group may te~inate the Group and joint obligations cont&ined in this Hamorandua of Under~tanding. Individual Group members may withd•aw f~om t~ South Kohala Wate~ Study G~oup upon written notice to other members; provided, that members shall reMain liable for their or 1ta pro-rata share of cos~s of operation• per tha approved budget or aaeudmanta thereto, incurr•d during their membership or prtor to Withdrawal, as the case aay ba.

n._._ This Meaora~p11 of Und8rstandina is &ntered into th1s ~~ day of ~ , 199IJ.

' MAUNA K!A P10PERTIES 1 IWC. N.ANSAY HAWAII, INC.

li:J ~_;,., •• ;I~t~-~~~~~------------- B; I;J:&4.._J

MAU'N4 LAlli llESOR.T, I!IC. WAIKOLOA LAlfD COHPAIIY

-4-

Page 28: application~ i~· ,~:,~P~'~------€¦ · linda lingle governor of hawaii state of hawaii department of land and natural resources commission on water resource management p.o.box621

. · JAil 31 '00 12:34 FROM:Tn'RE + T-766 P.OS/09 F-350 ""'' f.., liJ\hl lU•lvl\a f""'"" ~V" IU \UUUJ \l,'t ULI.J.J

,. &tll,(.'tUI A, IViJ

•., 1 " , . , t 1 ~ ·l•n -- -·- .... -.-.

DRAFT Water Cnmmitment Polkla and Proc:edures .,.

so.lb JCahQia w ... r I.Jstrs' Group KcYiscct: (febrUary 4, 1"3)

March 9, 1993

- - . ------------- - -- -·---------- ------ ---------·· -------- ------------------------------------------ -----

The South l<ohal• WAter U:~e1"& Croup (•Group''} r~es the need to deve!Qp a coherent set of policies and piOCedures for the development of groundwater to ensure maximum beneficial use of this limited resource, avoid conflicts among u~ers, omd facilitate the tinlely dev~lopment of water tied to actual use. The parties to this docwnent agree to abide by the policies and procedures it contains and encourage the State Conlmission on Water Resource Managen\ent (''Commission·) to evaluate all drilling and punlp installation permits received fron1 otbef wi\m users in the basil\ by the same criteria.

POUCI£5

1.

-1.

2.

3.

~ IJ'9YP reg>gnizes that aD parties need assurance of t4e.availability of water for their developments· The lrOUf furthex: reCognizes that such assUI'ilJlW sal'\ occur only jf. ieasreed to bxAll partiet.

. ~~

All drilling, well modification. and punlp installation pen11its will be fomlldOlted to conform to the U\tent of the then cun·ent version of the Group's approved South Kohala Water [Master] Resourc~ Plan.

All drilling. well modificatio"* and pump installation P«trmits will be submitted to the Group for its approval prior to subminal to the Comlllission. The Group's approval shall be based on the applicanrs conformance with tl\ese l)Olides, and the procedures listed below. The Group's approval shall not be unreasonably withheld if such conformance is demol'\Strated.

To mlninuze excessive use of groundwater, all effluent from sewage treatment plants shall be reused for irrigation unless it can be conclusively demonstrated to be physically and/ or econonlically impractical for the d.valoper of the il'tigation supply Ol' the ultimate user of the water.

Page 29: application~ i~· ,~:,~P~'~------€¦ · linda lingle governor of hawaii state of hawaii department of land and natural resources commission on water resource management p.o.box621

.. JAil 31 'DO 12:34 FROU:TNWRE +808-538-TTST T-7&& P.07/09 F-350 .,V,(.'fUI &, 1/iJ

~- '" . ,~. . ~- ~ ·1· ~ 4. All new landscaping, including golf cou1u turfgrass, wiD be designed

and implemented to n'\lninuze irrigation use. Efforts towaro this md shall include choosing appropriate plant materials, use of proper soil types and thiclcness, and avoiding excessive tudgrass areas. Any new 18 -hole golf com-se shall not use more tban 0.75 MGO on year-round average nor more than 1.00 MG'O over any seven-day period.

5. All new hotel, residential, couunetdal, and industrial develop,ment shall be designed to minimize water use and shall indude appropriate water saving devittS.

6. ·· ... Drilling pennits should be suppgrted if consistent with-the-Water---------------­Resource Plan as they provide mucb needed information about this r@lion's aauiler. ~ . . .

7. [Drilling and] Pun1p installation perntits shllll not be sought 1110~ than two yean in advance of ac:tual need [to avoid creating false shortages ol supply and inappropriate positioning for lhe resource, potentially denyii'g othe1·s their fair and equitable use].

8. Membe,·s of the Croup agree to devise water use standards for consumption of potable a!\d inigation water use in order to implement ilie.1e polidf~.

9. It is tfcognized that agreenlents between two(){ more parties may be ~ ~ ~ necessary to facilitate respective water developmenl [Such agreements .~J,.· shall be consistent with these policies and procedures.] ~

PROCEDURES

1. All applications for drilling, well modification, and pun1p installation pemlits, including extensions of these pemuts, will be submitted for review and approval by the Group to ensure conformance with the Intent of the Group's policies and [u1aster] water resource J)lan prior to submittal to the CoJI\lllission.

4 . To initiate the G1'0up's review, application will be submitted with the following suppo1·ting inlornlation:

a. Quantity [and timing] of potable and/ or non-potable supply • requiren1C!nt5, indudillg the basis for these projections (unit co\lnts, acreage, et,,).

Page 30: application~ i~· ,~:,~P~'~------€¦ · linda lingle governor of hawaii state of hawaii department of land and natural resources commission on water resource management p.o.box621

.· · }AM 31 '00 12:35 FROM:TNWRE +808-538-TTST T-766 P.OB/09 F-350

• • llUl, l.. l:l:lJ lU·I'tl\a I uu. uu 1

3.

b.

c.

d.

e.

f.

a. U c;onfonnance with these policies an~rocedur_e_s_ iS demonstrated [and tlu! tiu1ing of the applicatio11 is appropriate,] tbe Group's approval shall not be unreasonably wi thlleld.

b. If the application falls [0 &l\eet the standards for acceptability set out herein, no submittal of the application to the Commission shaD be made until revisions satjsfactol"y to the Group are ntade.

[c~ The Group's approval for a pump installation penult shall be given onJy after tentative subdivision appl'OVal for the project to be 5etvtd has beep given.]

(d. U a proven water source is a condition of County zoning or \lSe permit itpprovals, the Group's approval of a well c:onstruction perntlt shall be given only if evidence oi the a'tua) water use within two yea15 is provided.]

Page 31: application~ i~· ,~:,~P~'~------€¦ · linda lingle governor of hawaii state of hawaii department of land and natural resources commission on water resource management p.o.box621

JAN 31 '00 12:35 FRO~:TNWRE ; .. ;...... . . . " .. "' .....

I'

+ T-766 P.OS/09 F-350 nu. L'tU I '· ~I~

Thne Water Commitment Policies a.r\d Procedur~ are entered into this day r.f 1993.

·MalUM Kca fmpertles, IJK,

Br-~----------------------It. Br-~---------------------ltl

~una Lani Rtsort, Inc;. Waikoloi 'Land Comp;my

By.----------- By Its

Page 32: application~ i~· ,~:,~P~'~------€¦ · linda lingle governor of hawaii state of hawaii department of land and natural resources commission on water resource management p.o.box621

BENJAMIN J. CAYETANO OOV£RNOft OF HAWAM

TIMOTHY E. JOHNS

TO:

FROM:

STATE OF HAWAII DEPARTMENT OF LAND AND NATURAL RESOURCES

COMMISSION ON WATER RESOURCE MANAGEMENT P.O. BOX621

HONOLULU, HAWAII 96809

October 18, 1999

Mr. Dean Uchida, Administrator x-:f' Land Division ~ u ( ')--Linne! T. Nishioka, Deputy Director V fVJ uJ . Commission on Water Resow·ce Management (CWRM)

BRUCE S. ANDERSON ROBERT G. GIRALD BRIAN C. NISHIDA DAVID A NOBRIGA

HERBERT M. RICHARDS, JR

LINNEL T. NISHIOKA DEPUTY DIRECTOR

SUBJECT: Review Use Permit Application (Use 99-004) To Develop a Private 18-hole Golf Course, Clubhouse and Driving Range, North Kona, Hawaii TMK: 3/7-2-007:001

FILE NO.: USE9904.CMT

Thank you for the opportunity to review the subject document. Our comments related to water resources are marked below.

In general, the CWRM strongly promotes the efficient use of our water resources through conservation measures and use of alternative non-potable water resources whenever available, feasible, and there are no harmful effects to the ecosystem. Also, the CWRM encourages the protection of water recharge areas, which are important for the maintenance of streams and the replenishment of aquifers.

[x1

I I

[xI

[x)

[ 1

[ 1

[ 1

[ 1

I I

[x1

We recommend coordination with the county government to incorporate this project into the county's Water Use and Development Plan.

We recommend coordination with the Land Division of the State Department of Land and Natural Resources to incorporate this project into the State Water Projects Plan.

We are concerned about the potential for ground or surface water degradation/contamination and recommend that approvals for this project be conditioned upon a review by the State Department of Health and the developer's acceptance of any resulting requirements related to water quality.

A Well Construction Permit and/or a Pump Installation Permit from the Commission would be required before ground water is developed as a source of supply for the project.

The proposed water supply source for the project is located in a designated water management area, and a Water Use Permit from the Commission would be required prior to use of this source.

Groundwater withdrawals from this project may affect streamflows, which may require an instream flow standard amendment.

We recommend that no development take place affecting highly erodible slopes which drain into streams within or adjacent to the project.

If the proposed project includes construction of a stream diversion, the project may require a stream diversion works permit and amend the instream flow standard for the affected stream(s).

If the proposed project alters the bed and banks of a stream channel, the project may require a stream channel alteration permit.

OTHER:

It appears that the well that is described as Kau Well #2 is designated in our files as Kohanaiki Well #2 (State Well No. 4458-02. A pump installation was issued for this well on January 29, 1993. However, we did not receive a signed pump installation permit, nor any Indication that a pump was installed. The pump installation permit for this well expired on Janual)' 29, 1995. A new pump installation permit application should be submitted to the Commission, and subsequent pump installation work shall not proceed until a new pump installation permit is issued.

A copy of the DOH Engineering report shall also be submitted to the Commission for review.

If there are any questions, please contact Ryan lmata at

Page 33: application~ i~· ,~:,~P~'~------€¦ · linda lingle governor of hawaii state of hawaii department of land and natural resources commission on water resource management p.o.box621

--

JOHN WAIHEE WILLIAM W. PATY

GOVERNOR OF HAWAII CHAIRPERSON

JOHN C. LEWIN, M.D.

STATE OF HAWAII ROBERT S. NAKATA

RICHARD H. COX. P.E.

GUY K. FUJIMURA DEPARTMENT OF LAND AND NATURAL RESOURCES

COMMISSION ON WATER RESOURCE MANAGEMENT

P. 0. BOX 621

HONOLULU, HAWAII 96809

RAE M. LOUI, P.E.

PUMP INSfAUATION PERMIT

TO: Nansay Hawaii, Inc. P.O. Box 111222 Kamuela, HI 96743-0020

for

Kohanaiki-Nansay Well 2 Well No. 4458-02

Kau. North Kona. Hawaii

0\

In accordance with the Department of Land and Natural Resources Administrative Rules, Section 13-168, entitled 'Water Use, Wells, and Stream Diversion Works", your application to install a pump in Kohanaiki-Nansay Well2 (Well No. 4458-02) for private/municipal use is approved subject to the following conditions:

1. The Commission on Water Resource Management (Commission), P.O. Box 621, Honolulu, HI 96809, shall be notified in writing before any work covered by this permit commences.

2. The permit shall be for installation of a 700 gpm capacity pump in the well.

DEPUTY

3. The proposed use shall not adversely affect existing or future legal uses of water in the area, including any surface water or established instream flow standards. This permit or the authorization to pump water from the well shall not constitute a determination of correlative water rights. The permittee is notified and by this provision understands that the quantity of water taken from the well could be reduced by the Commission in the future. This permit is not a commitment that the pump capacity permitted here or even some lesser amount is guaranteed in the future.

4. The applicant shall provide and maintain an approved meter or other appropriate device or means for measuring and reporting total water usage. Water usage shall be measured on a monthly basis and reported to the Commission.

Page 34: application~ i~· ,~:,~P~'~------€¦ · linda lingle governor of hawaii state of hawaii department of land and natural resources commission on water resource management p.o.box621

PUMP INSTALLATION PERMIT Well No. 4458-02

5. The following shall be submitted to the Commission staff within 30 days after completion of the work:

a. Well Completion Report. b. As-built sectional drawing of the installed pump.

6. The applicant shall comply with all applicable laws, rules, and ordinances.

Page 2

7. This permit may be revoked if work is not started within six months of the date of issuance or if work is suspended or abandoned for six months. The work proposed in the permit application shall be completed within two years from the date of permit issuance.

8. The well will be turned over to the Hawaii Department of Water Supply for operation and maintenance.

~~ ~IlLIAM W. PA1Y, Chairperson (} ~ommission ori Water Resource Management

Date of'Issuance

I have read the conditions and terms of this permit and understand them. I accept and agree to meet these conditions as a prerequisite and underlying condition of my ability to proceed.

Applicant's Signature: -------------- Date:-------

Printed Name: -----------------

Firm or Title: -----------------

Please sign and return one copy of this permit to the Commission and retain a copy for your record.

Enc. (Well Completion form) c: USGS

Department of Health Safe Drinking Water Branch Ground Water Protection Program

Hawaii Department of Water Supply

Page 35: application~ i~· ,~:,~P~'~------€¦ · linda lingle governor of hawaii state of hawaii department of land and natural resources commission on water resource management p.o.box621

N1\NS1\Y t~ E ·""' r· r -- • --: ·, ' • • J

HAWAII, INC.

P 2: 3 I

•.. 1 ' '. ,. ......

November 17, 1992

Ms. Rae M. Loui Deputy Director DEPARTMENT OF LAND AND NATURAL RESOURCES P. 0. Box 621 Honolulu, Hawaii 96809

RE: PERMIT APPLICATIONS FOR NANSA Y HAWAII, INC.- WEST HAWAII

' ·r -

WELL CONSTRUCTION PERMITS PUMP INSTALLATION PERMITS

• Kalaoa- Nansay Well (Well No. 4358-02 Kohanaiki Weill (No. 4458-01) : Puako Well4 (No. 5748-01) ' Kohanaiki Well2 (No. 4458-02)

Puako Well 5 (No. 5648-04) Puako Well6 (No. 5549-02) North Waiaha- Nansay (No. 3857-02) O'oma Mauka- Nansay (No. 4258-02)

Dear ~1s. Loui:

I am responding to your letter of October 21, 1992, regarding the status of our projects in the North Kona and South Kohala Districts of Hawaii Island.

\Ve share your concetn for the fair and equitable distribution of the water resources in this region. We are committed to work with the County of Hawaii, State of Hawaii and regional land owners to develop a regional water plan that meets everyone's short term and long term needs. We have been actively involved with the above mentioned groups to develop such plans and are confident that we can find an equitable solution.

BIG 1')1 -\! j[) ( 11 Ill I

Kmnuelo Business Center !'0 Box 1117/), :;,_"t· · '2'7 1..1''" •· r • 1 1 I' '

f ~,, ,l11'q q;.cu; ··r '<,.

Page 36: application~ i~· ,~:,~P~'~------€¦ · linda lingle governor of hawaii state of hawaii department of land and natural resources commission on water resource management p.o.box621

Rae M. Loui November 17, 1992 Page Two

I .

Enclosed is a project summary for our projects in this region. We have included project desctiptions, timetables, entitlement progress and projected water needs for each.

We would welcome the opportunity to review this infom1ation with you and your staff at your convenience.

Very truly yours,

-rl=kl ~ Thomas H. Yamam o, P.E. Chief Operating Officer

THY /lo

attachments

loui \lhy\koh

Page 37: application~ i~· ,~:,~P~'~------€¦ · linda lingle governor of hawaii state of hawaii department of land and natural resources commission on water resource management p.o.box621

KOHANAIKI:

I .

WELLS (Nos. 4358-02; 3857-02; 4258-02; 4458-01; 4458-02)

470 acre resort site in North Kona 3 hotel sites- 1500 units 1 golf course 510 condominium units 380 single-family units 1.76 mgd potable water requirement 1.0 mgd irrigation brackish water will be supplied by the O'oma wells

We are awaiting a decision by the Intermediate Court of Appeals on the validity of our SMA permit. We expect to begin infrastructure construction in mid-1993 with the first hotel (800 rooms) being completed in 1996. Phase I will also include 380 single-family units and 330 multi-family units.

Page 38: application~ i~· ,~:,~P~'~------€¦ · linda lingle governor of hawaii state of hawaii department of land and natural resources commission on water resource management p.o.box621

WELLS (Nos. 4458-01; 4458-02)

Ka'u (North Kona)

This 1,000 acre project will be developed incrementally with an 82-lot subdivision (3-acre ag) beginning in late 1993.

The next 500 acre increment will be developed into 2,000 affordable units with construction to begin in mid-1994. It will be developed incrementally with 100- 200 units per year. Based on our projections, we will need 500,00 gpd for the Ag lots and 1.2 mgd for the housing units.

The Ag lots are already zoned and we are going through the subdivision work at this time.

The affordable housing will require approximately 1.2 million gallons per day starting with 120,000 gpd in 1994. We plan to submit applications for State Land Use boundary amendment and county zoning in 1993. Given that this will be a 100 percent affordable housing project we anticipate that the LUC and the county will provide expedited processing. Subdivision processing will commence in 1994 with units on line late in 1994.

Ou'r future plans include urbanization of the 225 acres of land currently in the conservation district at the bottom of this property. Although we do not have detailed plans for this development we expect to include a mix of urban uses. Water requirements are expected to be substantial though we do not have any figures to present at this time.

In order for this processing schedule to be attained we will need to secure pump installation permits for our Kau wells in early 1993 so that we can commit to the design expenditures, order the pumps and have installation in a timely manner.

Please note that for both Kau and Kohanaiki we will be integrating into the DWS system and therefore we are working with them on an agreement for integration. We do expect that the agreement will require that we provide the DWS system with additional water over and above what we use.

Page 39: application~ i~· ,~:,~P~'~------€¦ · linda lingle governor of hawaii state of hawaii department of land and natural resources commission on water resource management p.o.box621

Puako:

WELLS (Nos. 5748-01; 5648-04; 5549-02)

3,000 acres (2,000 Ag District, 1,000 Urban) 6 golf course Use Permits (approved 1991) 2,658 units- single and multi-family

(re-zoning to be completed by 1/93)

We presently have 3 well permits for brackish irrigation wells. The three pending well permits at Puako are to irrigate the remaining three golf courses. The projected need for the six golf courses is 6.16 mgd.

We anticipate construction of the first golf course to begin in 1993 with one additional course every two years. Golf course conshuction should be completed by 2004. We need to secure our water t~esources to ensure the entire build-out of the project will support the up-front infrastructure costs.

The potable water for the 2,658 units is intended to come from our previously permitted Ouli wells. We project an average demand of 1.3 mgd with a maximum/ day requirement of 1.90 mgd. The first units will come on line in 1995. Market absorption is projected at 125- 150 units per year with total build out in 20 years.

Bulk land sales of one or more of the villages could accelerate this process and would . require an early commitment of a guaranteed water resource.

Page 40: application~ i~· ,~:,~P~'~------€¦ · linda lingle governor of hawaii state of hawaii department of land and natural resources commission on water resource management p.o.box621

...

November 17, 1992

Ms. Rae M. Loui Deputy Director

( .

N;\NSi\Y HAWAII, N C •

DEPARTMENT OF LAND AND NATURAL RESOURCES P. 0. Box 621 Honolulu, Hawaii 96809

RE: PERMIT APPLICATIONS

0') H'1\t f 9 .J t.. I L• ;•

, .. r : " j l ..

FOR NANSAY HAWAII, INC.- WEST HAWAII

P 2: 3 I

WELL CONSTRUCTION PERMITS PUMP INSTALLATION PERMITS

-. Kalaoa- Nansay Well (Well No. 4358-02 Kohanaiki Weill (No. 4458-01) · Puako Well4 (No. 5748-01) c Kohanaiki Well 2 (No. 4458-02)

Puako Well 5 (No. 5648-04) Puako Well 6 (No. 5549-02) North Waiaha- Nansay (No. 3857-02) 0 1oma Mauka- Nansay (No. 4258-02)

Dear 1:1s. Loui:

I am responding to your letter of October 21, 1992, regarding the status of our projects in the North Kona and South Kohala Districts of Hawaii Island.

\Ve share your concetn for the fair and equitable distribution of the water resources in this region. We are committed to work with the County of Hawaii, State of Hawaii and regional land owners to develop a regional water plan that meets evetyone1

S short term and long term needs. We have been actively involved with the above mentioned groups to develop such plans and are confident that we can find an equitable solution.

BIG ISL/IJ~D ()f I ICT Komuelo Business Center PO B(Jx lllZ'2. :,1_!'1·· -:); f:. I"' .. : .. I I .,. I 1 '

Fm 8()'J.F185 71116

II( lf JOII II U 01 I ICf Strli1CJ''I1wold Buildinq 119 1-.1•·•• I'''"' "'''" 1 · ., , ... '· • 1 I f, •11· -!:1 1· 1 ' I · • ·I ·

Page 41: application~ i~· ,~:,~P~'~------€¦ · linda lingle governor of hawaii state of hawaii department of land and natural resources commission on water resource management p.o.box621

Rae M. Loui November 17, 1992 Page Two

Enclosed is a project summary for our projects in this region. We have included project descliptions, timetables, entitlement progress and projected water needs for each.

We would welcome the opportunity to review this infom1ation with you and your staff at your convenience.

Very truly yours,

rl=kl ~ Thomas H. Yamam o, P.E. Chief Operating Officer

THY/lo

attachments

loul\thy\koh

Page 42: application~ i~· ,~:,~P~'~------€¦ · linda lingle governor of hawaii state of hawaii department of land and natural resources commission on water resource management p.o.box621

KOHANAIKI:

I .

WELLS (Nos. 4358-02; 3857-02; 4258-02; 4458-01; 4458-02)

470 acre resort site in North Kona 3 hotel sites- 1500 units 1 golf course 510 condominium units 380 single-family units 1.76 mgd potable water requirement 1.0 mgd irrigation brackish water will be supplied by the O'oma wells

We are awaiting a decision by the Intermediate Court of Appeals on the validity of our SMA permit. We expect to begin infrastructure construction in mid-1993 with the first hotel (800 rooms) being completed in 1996. Phase I will also include 380 single-family units and 330 multi-family units.

Page 43: application~ i~· ,~:,~P~'~------€¦ · linda lingle governor of hawaii state of hawaii department of land and natural resources commission on water resource management p.o.box621

WELLS (Nos. 4458-01; 4458-02)

Ka'u (North Kona)

This 1,000 acre project will be developed incrementally with an 82-lot subdivision (3-acre ag) beginning in late 1993.

The next 500 acre increment will be developed into 2,000 affordable units with construction to begin in mid-1994. It will be developed incrementally with 100- 200 units per year. Based on our projections, we will need 500,00 gpd for the Ag lots and 1.2 mgd for the housing units.

The Ag lots are already zoned and we are going through the subdivision work at this time.

The affordable housing will require approximately 1.2million gallons per day starting with 120,000 gpd in 1994. We plan to submit applications for State Land Use boundary amendment and county zoning in 1993. Given that this will be a 100 percent affordable housing project we anticipate that the LUC and the county will provide expedited processing. Subdivision processing will commence in 1994 with units on line late in 1994.

Our future plans include urbanization of the 225 acres of land currently in the conservation district at the bottom of this property. Although we do not have detailed plans for this development we expect to include a mix of urban uses. Water requirements are expected to be substantial though we do not have any figures to present at this time.

In order for this processing schedule to be attained we will need to secure pump installation permits for our Kau wells in early 1993 so that we can commit to the design expenditures, order the pumps and have installation in a timely manner.

Please note that for both Kau and Kohanaiki we will be integrating into the DWS system and therefore we are working with them on an agreement for integration. We do expect that the agreement will require that we provide the DWS system with additional water over and above what we use.

Page 44: application~ i~· ,~:,~P~'~------€¦ · linda lingle governor of hawaii state of hawaii department of land and natural resources commission on water resource management p.o.box621

Puako:

WELLS (Nos. 5748-01; 5648-04; 5549-02)

3,000 acres (2,000 Ag District, 1,000 Urban) 6 golf course Use Permits (approved 1991) 2,658 units - single and multi-family

(re-zoning to be completed by 1 I 93)

We presently have 3 well permits for brackish irrigation wells. The three pending well permits at Puako are to irrigate the remaining three golf courses. The projected need for the six golf courses is 6.16 mgd.

We anticipate construction of the first golf course to begin in 1993 with one additional course every two years. Golf course conshuction should be completed by 2004. We need to secure our water resources to ensure the entire build-out of the project will support the up-front infrastructure costs.

The potable water for the 2,658 units is intended to come from our previously permitted Ouli wells. We project an average demand of 1.3 mgd with a maximum/ day requirement of 1.90 mgd. The first units will come on line in 1995. Market absorption is projected at 125- 150 units per year with total build out in 20 years.

Bulk land sales of one or more of the villages could accelerate this process and would require an early commitment of a guaranteed water resource.

Page 45: application~ i~· ,~:,~P~'~------€¦ · linda lingle governor of hawaii state of hawaii department of land and natural resources commission on water resource management p.o.box621

october 16, 1992

MEMORANDUM FOR THE RECORD

FROM: Glenn Bauer~ SUBJECT: Water Level Measurements in Kona

Mitch Ohye and I measured water levels in six Kona wells on October 15. All measurements were done between 10:15 a.m. and 2:40 p.m. We had intended to measure water levels at two Keauhou irrigation wells before 10, however, finding the wells in the dense undergrowth proved to be more difficult than anticipated. Therefore, we focused our survey to wells in the Kalaoa to Kukio area.

We met Keith Kato of Nansay and Steve Bowles of Waimea Water Services to assist in measuring the deep Kohanaiki Wells of Nansay. After completing these wells, Steve helped us to locate the State's Kalaoa Irrigation Well. The well was found and the head measured after a half hour of looking through the underbrush. We then looked for the County's Pahoehoe well. steve pointed out where it is located, but we will wait until the County DWS can help us with the measurement. We then measured the three Kukio Irrigation wells at 590± feet msl. This was the first time the heads in these wells were measured within a half hour of each other.

Below is a summary of the water level data collected:

Well Time Water Level (ft, msl)

Kohanaiki Well 1 1015 9.87 Kohanaiki Well 2 1100 9-o-5'2 10· ,,

Kalaoa Irr. Well 1231 2.00 Kukio Irr. Well 1 1409 1. 58 Kukio Irr. Well 3 1419 1. 58 Kukio Irr. Well 2 1440 1.16

Page 46: application~ i~· ,~:,~P~'~------€¦ · linda lingle governor of hawaii state of hawaii department of land and natural resources commission on water resource management p.o.box621

October 16, 1992

MEMORANDUM FOR THE RECORD

FROM: Glenn Bauer~ SUBJECT: Water Level Measurements in Kona

Mitch Ohye and I measured water levels in six Kona wells on October 15. All measurements were done between 10:15 a.m. and 2:40 p.m. We had intended to measure water levels at two Keauhou irrigation wells before 10, however, finding the wells in the dense undergrowth proved to be more difficult than anticipated. Therefore, we focused our survey to wells in the Kalaoa to Kukio area.

We met Keith Kato of Nansay and Steve Bowles of Waimea Water Services to assist in measuring the deep Kohanaiki Wells of Nansay. After completing these wells, Steve helped us to locate the State's Kalaoa Irrigation Well. The well was found and the head measured after a half hour of looking through the underbrush. We then looked for the County's Pahoehoe well. Steve pointed out where it is located, but we will wait until the County DWS can help us with the measurement. We then measured the three Kukio Irrigation wells at 590± feet msl. This was the first time the heads in these wells were measured within a half hour of each other.

Below is a summary of the water level data collected:

Well Time Water Level (ft, msl)

Kohanaiki Well 1 1015 9.87 Kohanaiki Well-2' 1100 9-;-5-2 tO· 1"1

Kalaoa Irr. Well 1231 2.00 Kukio Irr. Well 1 1409 1. 58 Kukio Irr. Well 3 1419 1. 58 Kukio Irr. Well 2 1440 1.16

Page 47: application~ i~· ,~:,~P~'~------€¦ · linda lingle governor of hawaii state of hawaii department of land and natural resources commission on water resource management p.o.box621

i1lP.,.1tR RESOURCE ASSOC. . TEL: y

Mar 03,92 15:08 No.002 P.01

WATER RESOURCE ASSOCIATES Hydrology • Oc:ology • Engineering

FAX COVER SHEET

Date of Transmission: 3 I 3/9 2

No. of Pages (inclucUng this sheet): !!..____

TO: Ed Sakoda, Div of W!iL~r Resource Mllnagcrncnl

FROM: DanJ.ym

MESSAGE:

Here's the Pumping TesL Record for Kau Well 2 (~~5R-02) for your information and filos.

1 l 24 Fon Sttc-.ct Mall, Suite 212 • Honolulu, Hawaii 96813 • (K08) 5~8·0074

' J f /;''1 /~. I ...

/ • f, \_,'Fft

Page 48: application~ i~· ,~:,~P~'~------€¦ · linda lingle governor of hawaii state of hawaii department of land and natural resources commission on water resource management p.o.box621

~td-AT.-£-.R...._.R-.E SiiiiiiO._.U ... R..,C E......,A..,S..,SiiiiiO C;.o-·;.;,·'"""""'T E;.;L....,:,..s.-o .r.8 --5-2-.8_-Oi18ii.iO.i8----•M•a r~0;.;;3..:.' ;;:;..:9 2=--.........=.:15::.....:...:::: O:..c::_8 No • 0 0 2 P • 0 2 ,.

PUMPING TEST RECORD Kau Well 2, North Kona, Hawaii

State Well No. 9·4459·02

DEPTHS (Balow Ground Surface): Solid C!!lg: 1810 ft. Perforated Csg: 1850 ft, 'Total Depth: 1880 ft.

oeptllto water: _ TEST PUMP: Une Shaft Intake Elev: -36.4 ft.

7·1S.81

8:1Sam 0 1(3.80

8:55 0 13.80

9:00 START PUMP· ADJUS't RATE TO 500 gpm

9:10 13.70

Et:lO fi46

9:22 545 13.70

9:39 732 13.60

9:44 136 13.60

9:57 732

10:00 1002 13.35

10:20 987 13.35

11:00 oas 13.30

11:22 998 13.30

12:00 N 100$ 13.26

1:00 996 13.26

2:00 008 HU6

8:00 995 13.20

4:00 &97 1e.20

5:00 995 13.20

8:00 1003 13.to

7'00 1003 13.05

6:00 100Z 13.2'0

13.10

"MeaGJXed by WRI logger, 3/1 1/91

water Re&Ouroe A5soolates

Test Date: July 1~H9, 1991

ELEVATIONS (Mean SeaLevel): Ground Surface: 1799.8 ft. Bottom of Solid Csg: -10ft.

Bottom of Perf. Csg: ~50 ft.

Bottom of Well: -80ft.

Static Water Level: .,M.i4 ft. •

0

0

0.23

0.23

0.4G

0.46 78.6

1.03 9

1.03

1.18

1.16

1.27

1.27 78.0

1.127 3

1.39

1.3& 4 9

1.39

1.~9

1.73

1.39 9

1.62

Page 49: application~ i~· ,~:,~P~'~------€¦ · linda lingle governor of hawaii state of hawaii department of land and natural resources commission on water resource management p.o.box621

,r WAl{R RESOURCE ASSOC .. TEL:BOB-

Pumping T••t Record (Contn.lad) Kou Wei 2, Notlh l<otla, Hawal Tast Date: July 1$-10, 1091

Mar 03.92 15:08 No.002 P.03

- . i ..

'7•1041

10:00 1)1'1'1 997 13,10 1.62 7 9

11:QC 898 13.00 1.0!1

12;00 M 1004 19.10 1.62 8 8

7•1&-tl

1:00am 998 13.10 1.62

2:00 1002 13.05 1.7~ 9 8

3:00 1002 1S.05 1.73

4:00 998 13.10 1.62 10 8

6:00 t07 13.05 1.73

6:00 1002 13.05 1.73 11 9

7:00 1000 13..00 1.95

8:00 1000 12.95 1.96 12 8

9:0(1 100.( 1U& 1.96

10:00 1002 12.95 1.96 13 8

11:00 0116 1U~ f.QG

12;00 N 100.6 12.95 1.~ 14 8

1.00pm ooe 1~!.00 2.08

2:00 996 12.90 2.08 15 9

8:00 1002 HUIIO 2.08

4:00 1001 12.90 2.08 Hi e 6:00 1001 12.110 e.oa 6:00 996 12.90 2.08 11 9

r:oo 1000 12.90 2.08

8:00 1000 12.90 2.00 18 6

9:00 1000 12.90 2.08

10:00 1000 12.90 2.08 19 9

11:00 ~!18 12.90 2.08

12:00 M 1000 HUO 2.08

7·17·11

1:00am 1000 12.00 2.0A

2:00 1000 12.85 2.19 21 8

·2-

Page 50: application~ i~· ,~:,~P~'~------€¦ · linda lingle governor of hawaii state of hawaii department of land and natural resources commission on water resource management p.o.box621

~81ER RESOURCE ASSOC .. TEL: •"

Pumping T•at Reoord (Contlnued) Kau Well 2. NOI'Ih ICona, HaWal T•atDate: July 11-11,1M1

7o17.Q1

3:00am -.4:00 1000

5:00 1000

6:00 1000

7:00 1005

8:00 100l

9:00 1004

10:00 100,

11:00 1000

12::00 N 1002

1:00pm 999

2:00 1003

3:00 1001

4:00 199

5:00 1001

6:00 995

7:01) 1004

8:00

10:00

12:00 M

7-111·11

1:00am 100:1

2:00 HS

3:00 1000

4:00 H8

6:00 1000

o;oo 99$

8:00 999

9:00 1005

10:00 100!J

12.85

12.85

12.85

12.85

12.75

12.75

12.76

1:2.70

12.75

1a1s

12.75

12.76

12.75

12:.70

12.80

12.80

12.80

12.AO

1UO

12.80

11i!.GO

12.80

12.80

12.80

12.7tl

12.75

1;;!,76

·3-

Mar 03,92 15:08 No.002 P.04

""'

2.11

2.19 22 9

2.19

2.19 23 9

2.43

2.43 24 11

2.43

2.5" 25 g

2.43

:1.48 2G g

2.43

2.43 2? Q

2.43

2.43 2B I)

2.31

2.31 29 s 2.31

30 6

31 g

32 e

2.31

2.31 33 Q

2.31

2.31 3-4 10

2.31

2.31 36 10

2.81

2.43 ~e 9

2.43

Z.43 37 10

Page 51: application~ i~· ,~:,~P~'~------€¦ · linda lingle governor of hawaii state of hawaii department of land and natural resources commission on water resource management p.o.box621

.WAl~R RESOURCE ASSOC .. TEL: Mar 03,92 15:10 No.002 P.05 ------------------------------------------------------

IDIImplng T .. t Record (CiOnllnUid) r<.u Well a, Noflh Kon .. HawaN Teat Da~ July 1&.10. 1001

- ;: ..

7-18-91

11;00 1004 12.76 Z.43

12:00 N 1005 12.75 2.43 38 11

1:oopm 1~ 12.76 2.43

2:00 1002 12.75 2.49 39 10

3:00 1005 12'.75 2.43 78.5

4:00 1002 12.75 2.49 40 11

5;00 1001 12.75 2.43

&:00 1002 12..75 2.43 41 11

7:00 1002 12.75 2.43

EI:OO 1002 12.75 2.43 42 11

Q:OO 1005 12.75 2.43

10;00 1003 12.7'15 2.43 43 12

11:00 1009 12.75 2.43

12:00 M 1003 1it7G 2.43 44 11

7•111-9t

1:ooam 8117 12.76 Z.43

2:00 997 12.76 2.43 45 12

3:00 1002 12.70 2.54

4:00 GQ8 ta. '11) :;!,&A .&£ 12

5:00 996 12.'711 1!.43

6:00 008 12.76 2.43 47 13

7:00 998 12.75 2.43

ti;OO 999 1!.7(; 2.4G 49 13 78.6

8:55 12.75 2.43

$:00 .STOP f>UMP • RECOVERY

g;00:45 13.30 1.16

8:0125 1;),&5 -0.11

9:02:30 13.70 0.23

9:03:40 13.55 0.~

0:04:45 13.45 0.81

·4-

Page 52: application~ i~· ,~:,~P~'~------€¦ · linda lingle governor of hawaii state of hawaii department of land and natural resources commission on water resource management p.o.box621

~A?ER RESOURCE ASSOC .. TEL:

Pumtllng Taat Aecard (Conllnuacl) l<au Wei 2, NOI1h Kotla, Hawai T•t Date: July 15-1t, 19e1

7-1H1

9:0S:OO

9;0720

9:09:30

9:11:40

9:16:00

11:20:00

0:10

rus 0:46

10:00

10:15

10:30

10;45

11:00

11;25 START PUMP

11:27

11:28

1f:2Q

11:30

11:31

11:33

11:35 1020

11:36

11:40

11:44 1008

11:45

11:50

11:!:10 STOP PVMP

11:55:60

11:67

13.35

13.40

1S.40

13.40

1!1.<10

13.40

18 . .«>

13.46

13.-46

13.45

13.46

13.45

13.46

13.45

12.55

12.80

12.75

12.90

12.0$

12.95

1::!.00

12.95

12.95

u.~

12.95

13.96

13.95

Mar 03,92 15:10 No.002 P.06

. ·' '·':

1.04

0.92

0.02

0.92

0.02

0.92

0.92

0.81

0.81

0.81

o.a1

0.81

0.81

0.81

2.69

2.31

2.43

2.09

1.G6

1.9&

1!.0&

UIG

1.9e 49 13

UEi

1.96

.0.35

.0.35

_,_

Page 53: application~ i~· ,~:,~P~'~------€¦ · linda lingle governor of hawaii state of hawaii department of land and natural resources commission on water resource management p.o.box621

WAl~R RESOURCE ~SSOC .. TEL:

Pun'lping Teet 1'\tooord (Oorltlnued) Kau WeN 2. Nortl Kon•, folawall Te&t O.ta: July 16·11~. 1HI

Mar 03.92 15:10 No.002 P.O?

-,;~;,; 7-18-1111

, 1:69 11.80 0

11:59 13.80 0

11;6lkts 10.76 0.11

11:59:30 13.70 0.23

12:00 N 13.70 0.25

12:01 pm 13.60 0.46

12:02 lMO 0.46

12:03 13.55 0.68

12:0!if lMtl 0.58

12:15 13.55 0.68

12:30 13.55 0.158

1:00 13.5S 0.58

7·21·91

s:1() pm 13.(10 0

7-U-D1

s:oo am 0 13.80 0

START PUM - ADJUGl' YO 1000 gprn

8;05 99a 13.30 0.5 50 24(?)

8;3[) 9~ 13.30 o.s 9;00 1002 13.30 0.5 76.5

10:00 1001 13.30 0.5 51 1?.

11:00 99Q 1S.25 0.66

12:00 N 1001 1:3.Z~ 0.65 5Z 11 7!Hl

12:30 pm 998 13.20 0.60

1:30 995 13.20 0.60

::l:OO QGG 1~.20 o.so 53 11

3:00 996 13.20 0.00

(l:ao 005 13.16 O.&S

4:00 996 13.15 0.65 54 13

4:30 1000 13.16 0.6&

·6-

Page 54: application~ i~· ,~:,~P~'~------€¦ · linda lingle governor of hawaii state of hawaii department of land and natural resources commission on water resource management p.o.box621

~RT!R RESOURCE ASSOC .. TEL: .... "

Pumping Taat Record iGanlii'M.I8d) l<au Welle, NOI'fl Kona, Hawllli Tact Data: Ju~ 1&-19. 1SID1

Har 03,92 15:10 No.002 P.OB

-7-22-01

$:00 pm 890 13.1:J 0.65

5:30 1000 13~ 10 0.70 55 13

eTOPPUMP·A~OOVEAY

6:39 0 13.76 0.05

5;40 13.70 0.10

6:42 13.85 0.16

5;()0 13.65 0.15

6;00 1US 0.16

7-23-91

7:00am 1!UO o,o

·7-

Page 55: application~ i~· ,~:,~P~'~------€¦ · linda lingle governor of hawaii state of hawaii department of land and natural resources commission on water resource management p.o.box621

, , , State oC HaweJl ""JJP CL.~ISSION ON WATER RESOURCE UANAGEMEhT

Department oC Land and Natural Resources Division o! Water Re~ource Management

WELL COMPLETION REPORT

IHSTRUCTIONS: Please print or type and submlt completed report wi'£Jilil30 days of well completion to tfie Dlvialon o! Water • Land Development, P.O. Box 373, Honolulu, HI 96809, An u-bullt drawing of the well and chemical analysis, tr available, should also be aubmltted, If necessary, phone HydrolotrY, OeolotrY S ectlon Cor aaalstance.

A. STATE WELL NO • __ 4_4_5_8_-_0_2 __ _ WELL NAME Kau Well #2 ISLAND Hawaii

B. LOCATION North Kona ")

TAX MAP KEY ------------------c. WELL OWNER Nansay Hawaii Inc.

D. DRILLING OR PUMP INSTALLATION CONTRACTOR Water Resources International, Inc.

E. F. a.

TYPE OF RIO Spencer Harris Rotary

DATE OF w'ELL COMPLETION 08/05/91

OROUND ELEVATION (mal) 1799.84 tt,

DRILLER Sidney Gonsalves

DATE OF PUMP lNSTALLATlON ____ n_a _____ _

Top o! Drilling Platform (mal) J 8Q7 . 9~ ft. Height o! drilling platform above ground aur!ace 8 .1 !t. Bench mark and method uaed, to determine il"Ound elevation _______ ft.

H. TOTAL DEPTH OF WELL BELOW OROUND 1850.± 1---

I.

J.

------------------------HOLE SIZE: 241

Inch d!a. from 0 Ct. to 1850 ft. below i~&~nd 17 2 inch dla. from 1850 ft. to 1880 ft. billow ~.round

_____ Inch dia. !rom Ct. to ____ !t. below ii·r~nd

CASINO INSTALLED: 18 ln. l.D, x _ 3/8 ln. wallaolid section to 1810 IS in. I.D. x --s?"''' ln. wall perforated section to

ft. 1850

"'T..-yp""'e--..o! perforation Ful-Flo --------------------------------------

.,r·····

'f"i 1

rr!

K. ANNULUS: Grouted !rom 0 ft. to 1780 !t. below ground Oravel packed from ft. to ------ ft. below ground

L, PERMANENT PUMP INSTALLATION: Pump type, make, aerial No • .._..-=---n_a ____________ _ Motor type, H.P., voltage, r.p.m,

Capacity ---- gpm

Depth of pump intake setting ----rr ft. below Depth o! bottom o! airline lt. below ----

which elevation Is Ct. which elevation Ia !t.

M. PROPOSED USE

N. INITIAL WATER LEVEL 1785.1tt, below ground. Date and time o! meaaurement 07/15/91t 0, INITIAL CHLORIDE 15 pprq1 · Date and time o! sampling 07/15/91 ,-----P. PUMPING TESTS: Re!erence point (R.P.) uaed: ___ which elevation It Ct.

Date .................. 9.?./J.?./.9..~....................... Date ........................................................... . Start water level ................................... ft. below R. P. Start water level ........................................... ft. below R. P. End water level ..................................... ft. below R. P. End water level ............................................. ft. below R. P. Depth of well ......................................... ft. below R. P. Depth of well ................................................. ft. below R. P.

Elapsed Rate Draw· Cl· Temp. Elapsed Rate Draw· Cl· Temp. Time ~hours) (gpm) down (ft.) (ppm) •f Time (hours) (gpm) down (It) (ppm) · F

.............. to .............. .............. .............. .............. .............. .. ....... , .... to .............. .............. .............. .............. .. ........... .

.............. to .............. .............. .............. .............. .............. .. ............ to .............. .............. .............. .. ..... ,...... .. .......... ..

.............. to ........ o:St.Al':~"Fl<OM"rimR .............. .............. .. ............ to .............. .............. .............. .............. .. .......... ..

.............. to .............. .............. .............. .............. .............. . ............. to ....... ,...... .............. .............. .............. .. ........... .

.............. to .............. .............. .............. .............. .............. .. ............ to .............. .............. .............. .............. .. .......... ..

.............. to .............. .............. .............. .............. ,............. . ............. to .............. .............. .............. .............. . ........... ..

Q. · DRILLER'S LCG: Water Level

septh, ft. 22 n~~~ ~e~i'~g~n ta~~ma:~sck ft. .............. to .............. "I1e<r: .... siaC:k:""Yava ... wlre·C! ·c:Tii<i"ers ........ i~1 to ... · .... ~g~ ··'flar'(f"""',. ............ fl' ......... ,.... .. .... , .... ..

........ 2as to ....... atJ6 "He<:r:.,.r-·ealo'rowii""Cirioe'i· 'ffil'x .... ..

........ 8D6 to ....... 93'5 "Ue'iis€tTariiiaTfon"""""""" ............ ..

::::: :::9.1~ ~~ ::J:~:?:9. :::9.n:n~:~~x::::::::::::::::::::::::::::::: :::::::::::::: .... J.f~.9to ... J.f9.-?. Dense formation .... J.*~} to .... 1~7.~ ::B~~:~::::g~~J./.~fiit~:::i~Y.~:: ~R:~t:::::: .... JAZ.~ to ... J.§~.~ ... ~~!:l.~~ ... ~.<?.;:gJ,~tt.?.~.............. .. .......... .. .... J.~~.~, to ..... !.?.~.~ .. !:!~.~.: .... ~~.~.L.<;.~!:!.~~E .. ~~~.. .. .......... .. .... }.?.~~to .... J?,;?} .. !:!~.~.: .... ~~.~.~.~ ... P..<?.r..<?.~§ ... ~~.Yq .. D~f.~.

Water Level Depth, ft. Rock Description & Remarks It,

...J.?.~~ .. to .J.?.§9 ... ... ti~.<:l .. · .... 1?.g.:f::t ... &I.?.l' ... ~ ... r.e.d .

. ............. to ........................ P..9.:r.g.v.~ ... :J.g.Y.g ... f.R.~k .. .

.............. to ................................................................ ..

. ........... :.to ....... , ......................................................... .

. ............. to .............. . ................................................. ..

:::::::::::::: ~~ ::::: Lat1 tude 11\ ~4[\;·~~: ·::

:::::::::::::: ~~ :::::~ Lo~g1tude 1,59' M' s-4• ·.: ...: .......... to...... Well No .f4 58-02 .. ............ to ................................. : ............................... .

REMARKS: ..... , ................................................................................ , ......................... , ........................................................................... .

:~~:::: __ by--(-~-r~1~--t~)--~~K-a~-t-h-~~-W-a--ta_n_a_b_e~· ~~--------Title ___ S..:.e.:.c..:.r.:.e..:.ta.::.r:..y~----------

Date __ o_c_t_o_b_e_r_3_0....;,_1_9_9_1 ______ _

Page 56: application~ i~· ,~:,~P~'~------€¦ · linda lingle governor of hawaii state of hawaii department of land and natural resources commission on water resource management p.o.box621

JOliN WAIHEE

GOVERNOR OF HAWAII

STATE OF HAWAII DEPARTMENT OF LAND AND NATURAL RESOURCES

COMMISSION ON WATER RESOURCE MANAGEMENT

Mr. Tom Yamamoto Nansay Hawaii, Inc. P.O. Box 111222 Kamuela, HI 96 7 43-0020

Dear Mr. Yamamoto:

P. 0. BOX 621 .·

HONOLULU, HAWAII 96809

JUN 5 1991

Permit Applications for Nansay Wells

JJ',. { I l.Ai\

WILLIAM W. PATY

CHAIRPERSON

JOHN C. LEWIN, M.D. MICHAEL J. CHUN, Ph.D.

ROBERT 5. NAKATA RICHARD H. COX

GUY K. FUJIMURA

MANABU TAGOMORI

DEPUTY

We are continuing our review of your applications for the· following wells: . -~

Kalaoa-Nansay Well (Well No. 4358-02) Puako Well 4 (Well No. 5748-01) Puako Well 5 (Well No. 5648-04) Puako Well 6 (Well No. 5549-02)

vl<ohanaiki Wells 1 2 (Well Nos. 4458-01 & 02)

We will let you know when your applications are scheduled for action by the Commission on Water Resource Management.

ES:bm En c. c: Water Resource Associates

Director

Page 57: application~ i~· ,~:,~P~'~------€¦ · linda lingle governor of hawaii state of hawaii department of land and natural resources commission on water resource management p.o.box621

Mr. Thomas K. Kaulukukui, Sr. Page 2

Should you have any questions, please contact Manabu Tagomori, Deputy Director at

Very truly yours,

En c.

Page 58: application~ i~· ,~:,~P~'~------€¦ · linda lingle governor of hawaii state of hawaii department of land and natural resources commission on water resource management p.o.box621

JOHN WAIHEE

GOVERNOR OF HAWAII

Si AIO: 37 STATE OF HAWAII

DEPARTMENT OF HEALTH P. 0. BOX 3378

HONOLULU, HAWAII 96801

May 10, 1991

JOHN C. LEWIN, M.D.

DIRECTOR OF HEALTH

In reply, please refer to:

EMD I SDWB

The Honorable William w. Paty, Chairperson Commission on Water Resource Management Department of Land and Natural Resources State of Hawaii P.O. Box 621 Honolulu, Hawaii 96809

Dear Mr. Paty:

SUBJECT: WELL CONSTRUCTION AND PUMP INSTALLATION PERMIT APPLICATION KOHANAIKI WELL NOS. 1 AND 2 STATE WELL NOS. 4458-01 AND -02 KAU, NORTH KONA, HAWAII

Thank you for the opportunity to review and comment on the subject document. We have examined the application and have the following comments to offer:

1. The application indicates that the subject well will be for municipal use. If the well is to serve 25 or more individuals at least 60 days per year or will have a minimum of 15 service connections, the applicant will be required to comply with the Department's Administrative Rules, Title 11, Chapter 20, "Potable Water Systems."

2. Section 11-20-29 of Chapter 20 requires that a new source of potable water serving a public water system be approved by the Director of Health prior to its use. Such an approval is based primarily upon the submission of a satisfactory engineering report which addresses the requirements set in Section 11-20-29.

3. The proposed well is situated above the Underground Injection Control (UIC) line. Land areas above the UIC line are considered to contain underground sources of drinking water. Thus, it is essential that the well be designed and constructed to prevent the possibility of groundwater contamination. For example, the well should have a concrete well pad and full grouting to prevent seepage or floodwaters from migrating down the well shaft.

Page 59: application~ i~· ,~:,~P~'~------€¦ · linda lingle governor of hawaii state of hawaii department of land and natural resources commission on water resource management p.o.box621

The Honorable William w. Paty Page 2 May 10, 1991

4. The operation of the well should not be allowed to adversely affect the water quality of nearby wells. The map accompanying the application indicates that there are a number of wells in the area.

If you should have any questions, please contact the Safe Drinking Water Branch at

SY:la cc: Thomas Yamamoto

Nansay Hawaii, Inc. P.O. Box 111222 Kamuela, Hawaii 96743-0020

.E., Chief Environmental Management Division

Page 60: application~ i~· ,~:,~P~'~------€¦ · linda lingle governor of hawaii state of hawaii department of land and natural resources commission on water resource management p.o.box621

5;;5

JOHN WAIHEE GOVERNOR

STATE OF HAWAII ' j

'l a , r~ I ,

HOALIKU L. DRAKE CHAIRMAN

HAWAIIAN HOMES COMMISSION

STATE OF HAWAII DEPARTMENT OF HAWAIIAN HOME LANDS

P. 0. BOX 1879

HONOLULU, HAWAII 96805

May 1, 1991

(. ··,.

\'""'

. C')

-".

The Honorable William w. Paty, Chairperson Commission on Water Resource Management Department of Land and Natural Resources P. 0. Box 621 Honolulu, Hawaii 96809

Dear Mr. Paty:

( ....... ' ., . ...--'.

Well Construction and Pump Installation Applications Stream Alteration Permit

Thank you for the opportunity to comment on the following permit applications:

Aohanaiki 1 & 2 (4458-01, 02) Well and Pump Puako 4-6 (5748-01, 5648-04, 5549-02) Well and Pump HCEOC-Milolii (1154-01) Well and Pump DHHL-Kawaihae (6448-02) Exploratory Well Fern Grotto 2 (0221-02) Well Anahola C (0818-03) Well and Pump Kapolei Irr C & D (2004-05, 2003-03) Well and Pump Moloka'i Golf 1 & 2 (0901-02, 1001-02) Well and Pump Naiwa-Ciba/Geigy Irrigation (0705-05) Pump

and Kihei Gulch No. 2 Stream Alteration Permit

Our comments are directed to two projects with positive impact on Hawaiian home lands -- Kawaihae and Anahola wells; and the Moloka'i Golf resubmittal, for which we prepared comments at an earlier time.

The Kawaihae Well is being drilled and tested for the Department of Hawaiian Home Lands by the Division of Water Resource Management; it will directly benefit new native Hawaiian lessees at Kawaihae, a major anticipated growth area and development priority. We anticipate potable results from the well testing, and request your approval of this project.

The Anahola Well will supplement the system on Hawaiian home lands in Anahola operated by Kaua'i County, which serves

~ .•• 1

l,,n,/

Page 61: application~ i~· ,~:,~P~'~------€¦ · linda lingle governor of hawaii state of hawaii department of land and natural resources commission on water resource management p.o.box621

CWRM Permits page 2

Hawaiian homesteaders and other members of this old community. The system is currently at capacity. Anahola is the Department's primary development area on the island of Kaua'i. We request your approval of this project.

The Moloka'i Golf resubmittal appears to be the same as the previous request, and we are attaching our prior comments, which are still relevant. That letter requests the project be denied.

The other captioned projects do not affect Hawaiian home lands, and we do not have comments at this time.

Warmest aloha,

HLD:DCY:CI

Page 62: application~ i~· ,~:,~P~'~------€¦ · linda lingle governor of hawaii state of hawaii department of land and natural resources commission on water resource management p.o.box621

Department of Public Works

Lorraine R. Inouye Mayor

Bruce C. McClure Chief Engineer

Laurence E. Capellas Deputy Chief Engineer

25 Aupuni Street, Room 202 • Hilo, liawaii 96720 • (808) • Fax

May 2, 1991

MR MANABU TAGOMORI DEPUTY DIRECTOR STATE OF HAWAII DEPARTMENT OF LAND AND NATURAL RESOURCES COMMISSION ON WATER RESOURCE MANAGEMENT P 0 BOX 621 HONOLULU HI 96809

SUBJECT: WELL CONSTRUCTION PERMIT APPLICATION

., .. .. , .l.,

( ... ''t

co

We have reviewed the subject permit application and have no objections to the following proposed wells being constructed.

1. Kohanaiki 1, Well No. 4458-01 lMK: 7-2-5: 1

~2. Kohanaiki 2, Well No. 4458-02 TMK: 7-2-5: 1

3. Puako 4, Well No. 5748-01 TMK: 6-8-01: 36

4. Puako 5, Well No. 5648-04 TMK: 6-8-01: 36

5. Puako 6, Well No. 5549-02 TMK: 6-8-01: 36

6. HCEOC-Milolii, Well No. 1154-01 TMK: 8-9-4: por. 8

7. DHHL-Kawaihae Expl., Well No. 6448-02 TMK: 6-1-01: 3

4ROB~~u, Division Chief { En~~e~ing Division

Q<Y:byf

! '

. I ·,.,,.1

Page 63: application~ i~· ,~:,~P~'~------€¦ · linda lingle governor of hawaii state of hawaii department of land and natural resources commission on water resource management p.o.box621

JOHN WAIHEE

GOVERNOR OF HAWAII ' WILLIAM W. PATY, CHAIRPERSON

BOARD OF lAND AND NATURAL RESOURCES

DEPUTIES

,-. ·/. ,. i 6 F' 3 . 4 5 KEITH W. AHUE

MANARU TAGOMORI DAN T. KOCHI

-.jt

MEMORANDUM

TO:

FROM:

SUBJECT:

STATE OF HAWAII

.j~RTMENT OF LAND AND NATURAL RESOURCES .. ;'.:]{ \ STATE HISTORIC PRESERVATION DIVISION

33 SOUTH KING STREET, 6TH FLOOR

HONOLULU. HAWAII 96813

May 1. 1991

Manabu Tagomori. Deputy Director Commission on Water Resource Management

AQUACULTURE DEVELOPMENT PROGRAM

AQUATIC RESOURCES CONSERVATION AND

ENVIRONMENTAL AFFAIRS CONSERVATION AND

RESOURCES ENFORCEMENT CONVEYANCES FORESTRY AND WILDLIFE HISTORIC PRESERVATION

PROGRAM LAND MANAGEMENT STATE PARKS WATER RESOURCE MANAGEMENT

Don Hibbard, Administrator ~~;/~ State Historic Preservation Division j£1 Well and Pump Installation Permit -- ump Installation for Existing Kohanaiki Wells (Nansay Hawaii. Inc.) Well Nos 4458-01 & -02 Kau. North Kona. Hawaii TMK: 1..:-2-05: --=1=---------------------

HISTORIC PRESERVATION PROGRAM CONCERNS:

we believe that installation of a pump in this existing well will have "no effect" on historic sites because it will apparently cause no additional disturbance of the surrounding ground surface.

If you have any questions about this review. please call Holly McEldowney at

Page 64: application~ i~· ,~:,~P~'~------€¦ · linda lingle governor of hawaii state of hawaii department of land and natural resources commission on water resource management p.o.box621

CWRM Permits page 2

Hawaiian homesteaders and other members of this old community. The system is currently at capacity. Anahola is the Department's primary development area on the island of Kaua'i. We request your approval of this project.

The Moloka'i Golf resubmittal appears to be the same as the previous request, and we are attaching our prior comments, which are still relevant. That letter requests the project be denied.

The other captioned projects do not affect Hawaiian home lands, and we do not have comments at this time.

Warmest aloha,

HLD:DCY:CI

Page 65: application~ i~· ,~:,~P~'~------€¦ · linda lingle governor of hawaii state of hawaii department of land and natural resources commission on water resource management p.o.box621

Department of Public Works

Lorraine R. Inouye Mayor

Bruce C. McClure Chief Engineer

Laurence E. Capellas Deputy Chief Engineer

25 Aupuni Street, Room 202 • Hilo, Hawaii 96720 • (808) • Fax

May 2, 1991 ( :::}

... · ... -··· i''!'

MR MANABU TAGOMORI DEPUTY DIRECTOR STATE OF HAWAII DEPARTMENT OF LAND AND NATURAL RESOURCES COMMISSION ON WATER RESOURCE MANAGEMENT P 0 BOX 621 HONOLULU HI 96809

SUBJECT: WELL CONSTRUCTION PERMIT APPLICATION

,.,., , .....

10')

We have reviewed the subject permit application and have no objections to the following proposed wells being constructed.

'"--' 1 • Kohanaiki 1, Well No. 4458-01 TMK: 7-2-5: 1

2. Kohanaiki 2, Well No. 4458-02 TMK: 7-2-5: 1

3. Puako 4, Well No. 5748-01 TMK: 6-8-01: 36

4. Puako 5, Well No. 5648-04 TMK: 6-8-01: 36

5. Puako 6, Well No. 5549-02 TMK: 6-8-01: 36

6. HCEOC-Milolii, Well No. 1154-01 TMK: 8-9-4: por. 8

7. DHHL-Kawaihae Expl., Well No. 6448-02 TMK: 6-1-01: 3

4 ROBLJD~u. Division Chief { En~~e~ing Division

CKY:byf

, .

.·I

Page 66: application~ i~· ,~:,~P~'~------€¦ · linda lingle governor of hawaii state of hawaii department of land and natural resources commission on water resource management p.o.box621

JOHN WAIHEE

GOVERNOR OF HAWAII

WILLIAM W. PATY

CHAIRPERSON

JOHN C. LEWIN, M.D. MICHAEL J. CHUN, Ph.D.

STATE OF HAWAII DEPARTMENT OF LAND AND NATURAL RESOURCES

COMMISSION ON WATER RESOURCE MANAGEMENT

Mr. William Sewake, Manager Department of Water Supply County of Hawaii 25 Aupuni Street

Hilo, Hawru:1~~27 Dear Mr.~~

P. 0. BOX 621

Well Construction and Pump Installation Permit Application(s)

Transmitted for your review and comment is a copy of the following permit application(s):

Island Well Name Well No. Application Tvoe

Hawaii Kohanaiki 1 4458-01 Well and Pump Hawaii Kohanaiki 2 4458-02 Well and Pump Hawaii Puako 4 5748-01 Well and Pump Hawaii Puako 5 5648-04 Well and Pump Hawaii Puako 6 5549-02 Well and Pump Hawaii HCEOC-Milolii 1154-01 Well and Pump Hawaii DHHL-Kawaihae Expl. 6448-02 .Well

ROBERT S. NAKATA RICHARD H. COX

GUY K. FUJIMURA

MANABU TAGOMORI

DEPUTY

Please review the application(s) pursuant to your area of concern and submit your comments to us, orally or in writing, by ten (10) working days from date of letter.

NF:bm En c.

Should you have any questions, please contact our Regulation Branch at

Page 67: application~ i~· ,~:,~P~'~------€¦ · linda lingle governor of hawaii state of hawaii department of land and natural resources commission on water resource management p.o.box621

JOHN WAIHEE

GOVERNOR OF HAWAII

STATE OF HAWAII DEPARTMENT OF LAND AND NATURAL. RESOURCES

COMMISSION ON WATER RESOURCE MANAGEMENT

Mr. Bruce C. McClure Chief Engineer Department of Public Works County of Hawaii 25 Aupuni Street Hilo, Hawaii 96 720

Dear Mr. McClure:

P. 0. BOX 621

HONOLULU, HAWAII 96809

APR I 9 1991

Well Construction and Pump Installation Permit Application(s)

WILLIAM W. PATY

CHAIRPERSON

JOHN C. LEWIN, M.D. MICHAEL J. CHUN. Ph.D.

ROBERT S. NAKATA

RICHARD H. COX GUY K. FUJIMURA

MANABU TAGOMORI

DEPUTY

Transmitted for your review and comment is a copy of the following permit application(s):

Island Well Name Well No. Application Type

Hawaii Kohanaiki 1 4458-01 Well and Pump Hawaii Kohanaiki 2 4458-02 Well and Pump Hawaii Puako 4 5748-01 Well and Pump Hawaii Puako 5 5648-04 Well and Pump Hawaii Puako 6 5549-02 Well and Pump Hawaii HCEOC-Milolii 1154-01 Well and Pump Hawaii DHHL-Kawaihae Expl. 6448-02 Well

Please review the application(s) pursuant to your area of concern and submit your comments to us, orally or in writing, by ten (10) working days from date of lettet.

NF:bm Enc.

Should you have any questions, please contact our Regulation Branch at

Page 68: application~ i~· ,~:,~P~'~------€¦ · linda lingle governor of hawaii state of hawaii department of land and natural resources commission on water resource management p.o.box621

JOHN WAIHEE

GOVERNOR OF HAWAII

STATE OF HAWAII DEPARTMENT OF LAND AND NATURAL RESOURCES

COMMISSION ON WATER RESOURCE MANAGEMENT

REF:WRM-BM

Honorable John C. Lewin, M.D. Director Department of Health State of Hawaii 1250 Punchbowl Street Honolulu, Hawaii 96813

P. 0. BOX 621

HONOLULU, HAWAII 96809

APR I 9 1991

Attn: Mr. William Wong, Drinking Water. Branch

Dear Dr. Lewin:

Well Construction and Pump Installation Permit Application(s)

WILLIAM W. PATY

CHAIRPERSON

JOHN C. LEWIN. M.D. MICHAEL J. CHUN. Ph.D.

ROBERT S. NAKATA RICHARD H. COX

GUY K. FUJIMURA

MANABU TAGOMORI

DEPUTY

Transmitted for your review and comment is a copy of the following permit application(s):

Island Well Name Well No. Application Tvoe Hawaii Kohanaiki 1 4458-01 Well and Pump Hawaii Kohanaiki 2 4458-02 Well and Pump Hawaii Puako 4 5748-01 Well and Pump Hawaii Puako 5 5648-04 Well and Pump Hawaii Puako 6 5549-02 Well and Pump Hawaii HCEOG-Milolii 1154-01 Well and Pump Hawaii DHHL-Kawaihae Expl. 6448-02 Well Kauai Fern Grotto 2 0221-02 Well and Pump Kauai Anahola C 0818-03 Well and Pump Oahu Kapolei Irr. C 2004-05 Well and Pump Oahu Kapolei Irr. D 2003-03 Well and Pump Molokai Molokai Golf 1 0901-02 Well and Pump Molokai Molokai Golf 2 1001-02 Well and Pump

Please review the application(s) pursuant to your area of concern and submit your comments to us, orally or in writing, by ten (10) working days from date of letter.

Page 69: application~ i~· ,~:,~P~'~------€¦ · linda lingle governor of hawaii state of hawaii department of land and natural resources commission on water resource management p.o.box621

Honorable John C. Lewin, M.D. Page 2

Should you have any questions, please contact Manabu Tagomori, Deputy Director at

Very truly yours,

Enc.

Page 70: application~ i~· ,~:,~P~'~------€¦ · linda lingle governor of hawaii state of hawaii department of land and natural resources commission on water resource management p.o.box621

' . ...

JOHN WAIHEE

GOVERNOR OF HAWAII

WILLIAM W. PATY

CHAIRPERSON

STATE OF HAWAII DEPARTMENT OF LAND AND NATURAL RESOURCES

COMMISSION ON WATER RESOURCE MANAGEMENT REF:WRM-BM

Mr. Thomas K. Kaulukukui, Sr. Chairman & Trustee-At-Large Office of Hawaiian Affairs 1600 Kapiolani Blvd., Suite 1500 Honolulu, Hawaii 96814

P. 0. BOX 621

HONOLULU, HAWAII 96809

APR I 9 199f

Attn: Ms. Linda Delaney, Land & Natural Resources Division

Dear Mr. Kaulukukui:

Well Construction and Pump Installation Permit Application(s)

JOHN C. LEWIN. M.D. MICHAEL J. CHUN. Ph.D.

ROBERT S. NAKATA RICHARD H. COX

GUY K. FUJIMURA

MANABU TAGOMORI

DEPUTY

Transmitted for your review and comment is a copy of the following permit application(s):

Island Well Name Well No. Application Type

Hawaii Kohanaiki 1 4458-01 Well and Pump Hawaii Kohanaiki 2 4458-02 Well and Pump Hawaii Puako 4 5748-01 Well and Pump Hawaii Puako 5 5648-04 Well and Pump Hawaii Puako 6 5549-02 Well and Pump Hawaii HCEOC-Milolii 1154-01 Well and Pump Hawaii DHHL-Kawaihae Expl. 6448-02 Well Kauai Fern Grotto 2 0221-02 Well and Pump Kauai Anahola C 0818-03 Well and Pump Oahu Kapolei lrr. C 2004-05 Well and Pump Oahu Kapolei lrr. D 2003-03 Well and Pump Molokai Molokai Golf 1 0901-02 Well and Pump Molokai Molokai Golf 2 1001-02 Well and Pump

Please review the application(s) pursuant to your area of concern and submit your comments to us, orally or in writing, by ten (10) working days from date of letter.

Page 71: application~ i~· ,~:,~P~'~------€¦ · linda lingle governor of hawaii state of hawaii department of land and natural resources commission on water resource management p.o.box621

j····

JOHN WAIHEE

GOVERNOR OF HAWAII

WILLIAM W. PATY

CHAIRPERSON

STATE OF HAWAII DEPARTMENT OF LAND AND NATURAL RESOURCES

COMMISSION ON WATER RESOURCE MANAGEMENT REF:WRM-BM

Honorable Hoaliku L. Drake Director

P. 0. BOX 621

HONOLULU. HAWAII 96809

APR 19 1991

Department of Hawaiian Home Lands State of Hawaii P.O. Box 1879 Honolulu, Hawaii 96805

Dear Mrs. Drake:

Well Construction and Pump Installation Permit Application(s)

JOHN C. LEWIN, M.D. MICHAEL J. CHUN, Ph.D.

ROBERT S. NAKATA RICHARD H. COX

GUY K. FUJIMURA

MANABU TAGOMORI

DEPUTY

Transmitted for your review and comment is a copy of the following permit application(s):

Island Well Name Well No. Application Type

Hawaii Kohanaiki 1 4458-01 Well and Pump Hawaii Kohanaiki 2 4458-02 Well and Pump Hawaii Puako 4 5748-01 Well and Pump Hawaii Puako 5 5648-04 Well and Pump Hawaii Puako 6 5549-02 Well and Pump Hawaii HCEOC-Milolii 1154-01 Well and Pump Hawaii DHHL-Kawaihae Expl. 6448-02 Well Kauai Fern Grotto 2 0221-02 Well and Pump Kauai Anahola C 0818-03 Well and Pump Oahu Kapolei Irr. C 2004-05 Well and Pump Oahu Kapolei Irr. D 2003-03 Well and Pump Molokai Molokai Golf 1 0901-02 Well and Pump Molokai Molokai Golf 2 1001-02 Well and Pump

Please review the application(s) pursuant to your area of concern and submit your comments to us, orally or in writing, by ten (10) working days from date of letter.

Page 72: application~ i~· ,~:,~P~'~------€¦ · linda lingle governor of hawaii state of hawaii department of land and natural resources commission on water resource management p.o.box621

Honorable Hoaliku L. Drake Page 2

Should you have any questions, please contact Manabu Tagomori, Deputy Director at

Very truly yours,

Enc.

Page 73: application~ i~· ,~:,~P~'~------€¦ · linda lingle governor of hawaii state of hawaii department of land and natural resources commission on water resource management p.o.box621

,fb(<.. ~No .-P-~ (_...~

~k~ WILLIAM W. PATY

CHAIRPERSON

JOHN C. LEWIN, M.D.

MICHAEL J. CHUN. Ph.D.

STATE OF HAWAII DEPARTMENT OF LAND AND NATURAL RESOURCES

COMMISSION ON WATER RESOURCE MANAGEMENT

Mr. Thomas Yamamoto Nansay Hawaii Inc. P .0. Box 111222

P. 0. BOX 621

HONOLULU, HAWAII 96809

APR I 8 1991

Kamuela, Hawaii 96743-0020

Dear Mr. Yamamoto:

We have received your applications and filing fees for permits to construct and/or install a pump in the following wells:

ISLAND WELL NAME WELL NO. TMK

vHawaii Kohanaiki 1 4458-01 7-2-05:01 Hawaii Kohanaiki 2 4458-02 7-2-05:01 Hawaii Puako 4 5748-01 6-8-01:36 Hawaii Puako 5 5648-04 6-8-01:36 Hawaii Puako 6 5549-02 6-8-01:36

We are reviewing the applications for completeness.

Should you have questions, please call the Regulation Branch of the Division of Water Resource Management at

ROBERT S. NAKATA

RICHARD H. COX GUY K. FUJIMURA

MANABU TAGOMORI

DEPUTY

(;t ~-----.... U TAGOMORI

NF:bm

Page 74: application~ i~· ,~:,~P~'~------€¦ · linda lingle governor of hawaii state of hawaii department of land and natural resources commission on water resource management p.o.box621

JOHN WAIHEE

GOVERNOR OF HAWAII

STATE OF HAWAII DEPARTMENT OF LAND AND NATURAL RESOURCES

COMMISSION ON WATER RESOURCE MANAGEMENT REF:WRM-BM

Honorable Hoaliku L. Drake Director

P. 0. BOX 621

HONOLULU, HAWAII 96809

APR 19 1991

Department of Hawaiian Home Lands State of Hawaii P.O. Box 1879 Honolulu, Hawaii 96805

Dear Mrs. Drake:

Well Construction and Pump Installation Permit Application(s)

WILLIAM W. PATY

CHAtRPERSON

JOHN C. LEWIN, M.D. MICHAEL J. CHUN, Ph.D.

ROBERT S. NAKATA RICHARD H. COX

GUY K. FUJIMURA

MANABU TAGOMORI

DEPUTY

Transmitted for your review and comment is a copy of the following permit application(s):

Island Well Name Well No. Application Tvoe

Hawaii Kohanaiki 1 4458-01 Well and Pump Hawaii Kohanaiki 2 4458-02 Well and Pump Hawaii Puako 4 5748-01 Well and Pump Hawaii Puako 5 5648-04 Well and Pump Hawaii Puako 6 5549-02 Well and Pump Hawaii HCEOC-Milolii 1154-01 Well and Pump Hawaii DHHL-Kawaihae Expl. 6448-02 Well Kauai Fern Grotto 2 0221-02 Well and Pump Kauai Anahola C 0818-03 Well and Pump Oahu Kapolei Irr. C 2004-05 Well and Pump Oahu Kapolei Irr. D 2003-03 Well and Pump Molokai Molokai Golf 1 0901-02 Well and Pump Molokai Molokai Golf 2 1001-02 Well and Pump

Please review the application(s) pursuant to your area of concern and submit your comments to us, orally or in writing, by ten (10) working days from date of letter.

Page 75: application~ i~· ,~:,~P~'~------€¦ · linda lingle governor of hawaii state of hawaii department of land and natural resources commission on water resource management p.o.box621

Honorable Hoaliku L. Drake Page 2

Should you have any questions, please contact Manabu Tagomori, Deputy Director at

Very truly yours,

Enc.

Page 76: application~ i~· ,~:,~P~'~------€¦ · linda lingle governor of hawaii state of hawaii department of land and natural resources commission on water resource management p.o.box621

JOHN WAIHEE

GOVERNOR OF HAWAII

STATE OF HAWAII DEPARTMENT OF LAND AND NATURAL RESOURCES

COMMISSION ON WATER RESOURCE MANAGEMENT

REF:WRM-BM

Mr. Thomas K. Kaulukukui, Sr. Chairman & Trustee-At-Large Office of Hawaiian Affairs 1600 Kapiolani Blvd., Suite 1500 Honolulu, Hawaii 96814

P. 0. BOX 621

HONOLULU. HAWAII 96809

APR I 9 1991

Attn: Ms. Linda Delaney, Land & Natural Resources Division

Dear Mr. Kaulukukui:

Well Construction and Pump Installation Permit Application(s)

WILLIAM W. PATY

CHAIRPERSON

JOHN C. LEWIN, M.D. MICHAEL J. CHUN, Ph.D.

ROBERT S. NAKATA

RICHARD H. COX GUY K. FUJIMURA

MANABU TAGOMORI

DEPUTY

Transmitted for your review and comment is a copy of the following permit application(s):

Island Well Name Well No. Application Type

Hawaii Kohanaiki 1 4458-01 Well and Pump Hawaii Kohanaiki 2 4458-02 Well and Pump Hawaii Puako 4 5748-01 Well and Pump Hawaii Puako 5 5648-04 Well and Pump Hawaii Puako 6 5549-02 Well and Pump Hawaii HCEOC-Milolii 1154-01 Well and Pump Hawaii DHHL-Kawaihae Expl. 6448-02 Well Kauai Fern Grotto 2 0221-02 Well and Pump Kauai Anahola C 0818-03 Well and Pump Oahu Kapolei Irr. C 2004-05 Well and Pump Oahu Kapolei Irr. D 2003-03 Well and Pump Molokai Molokai Golf 1 0901-02 Well and Pump Molokai Molokai Golf 2 1001-02 Well and Pump

Please review the application(s) pursuant to your area of concern and submit your comments to us, orally or in writing, by ten (10) working days from date of letter.

Page 77: application~ i~· ,~:,~P~'~------€¦ · linda lingle governor of hawaii state of hawaii department of land and natural resources commission on water resource management p.o.box621

Mr. Thomas K. Kaulukukui, Sr. Page 2

Should you have any questions, please contact Manabu Tagomori, Deputy Director at

Very truly yours,

Enc.

Page 78: application~ i~· ,~:,~P~'~------€¦ · linda lingle governor of hawaii state of hawaii department of land and natural resources commission on water resource management p.o.box621

JOHN WAIHEE

GOVERNOR OF HAWAII

STATE OF HAWAII DEPARTMENT OF LAND AND NATURAL RESOURCES

COMMISSION ON WATER RESOURCE MANAGEMENT

REF:WRM-BM

Honorable John C. Lewin, M.D. Director Department of Health State of Hawaii 1250 Punchbowl Street Honolulu, Hawaii 96813

P. 0. BOX 621

HONOLULU, HAWAII 96809

APR I 9 1991

Attn: Mr. William Wong, Drinking Water. Branch

Dear Dr. Lewin:

Well Construction and Pump Installation Permit Application(s)

WIUIAM W. PATY

CHAIRPERSON

JOHN C. LEWIN, M.D. MICHAEL J. CHUN, Ph.D.

ROBERT S. NAKATA RICHARD H. COX

GUY K. FUJIMURA

MANABU TAGOMORI

DEPUTY

Transmitted for your review and comment is a copy of the following permit application(s):

Island Well Name Well No. Application Tvoe Hawaii Kohanaiki 1 4458-01 Well and Pump Hawaii Kohanaiki 2 4458-02 Well and Pump Hawaii Puako 4 5748-01 Well and Pump Hawaii Puako 5 5648-04 Well and Pump Hawaii Puako 6 5549-02 Well and Pump Hawaii HCEOG-Milolii 1154-01 Well and Pump Hawaii DHHL-Kawaihae Expl. 6448-02 Well Kauai Fern Grotto 2 0221-02 Well and Pump Kauai Anahola C 0818-03 Well and Pump Oahu Kapolei Irr. C 2004-05 Well and Pump Oahu Kapolei Irr. D 2003-03 Well and Pump Molokai Molokai Golf 1 0901-02 Well and Pump Molokai Molokai Golf 2 1001-02 Well and Pump

Please review the application(s) pursuant to your area of concern and submit your comments to us, orally or in writing, by ten (10) working days from date of letter.

Page 79: application~ i~· ,~:,~P~'~------€¦ · linda lingle governor of hawaii state of hawaii department of land and natural resources commission on water resource management p.o.box621

Honorable John C. Lewin, M.D. Page 2

Should you have any questions, please contact Manabu Tagomori, Deputy Director at

Very truly yours,

En c.

Page 80: application~ i~· ,~:,~P~'~------€¦ · linda lingle governor of hawaii state of hawaii department of land and natural resources commission on water resource management p.o.box621

JOHN WAIHEE

GOVERNOR OF HAWAII

STATE OF HAWAII DEPARTMENT OF LAND AND NATURAL RESOURCES

COMMISSION ON WATER RESOURCE MANAGEMENT

Mr. William Sewake, Manager Department of Water Supply County of Hawaii 25 Aupuni Street

Hilo, Haw~~~2? Dear Mr.~~

P. 0. BOX 621

Well Construction and Pump Installation Permit Application(s)

WILLIAM W. PATY

CHAIRPERSON

JOHN C. LEWIN, M.D. MICHAEL J. CHUN, Ph.D.

ROBERT S. NAKATA

RICHARD H. COX GUY K. FUJIMURA

MANABU TAGOMORI

DEPUTY

Transmitted for your review and comment is a copy of the following permit application(s):

Island Well Name Well No. Application Type

Hawaii Kohanaiki 1 4458-01 Well and Pump Hawaii Kohanaiki 2 4458-02 Well and Pump Hawaii Puako 4 5748-01 Well and Pump Hawaii Puako 5 5648-04 Well and Pump Hawaii Puako 6 5549-02 Well and Pump Hawaii HCEOC-Milolii 1154-01 Well and Pump Hawaii DHHL-Kawaihae Expl. 6448-02 .Well

Please review the application(s) pursuant to your area of concern and submit your comments to us, orally or in writing, by ten (10) working days from date of letter.

NF:bm En c.

Should you have any questions, please contact our Regulation Branch at

Page 81: application~ i~· ,~:,~P~'~------€¦ · linda lingle governor of hawaii state of hawaii department of land and natural resources commission on water resource management p.o.box621

JOHN WAIHEE

GOVERNOR OF HAWAII

STATE OF HAWAII DEPARTMENT OF LAND AND NATURAL RESOURCES

COMMISSION ON WATER RESOURCE MANAGEMENT

Mr. Bruce C. McClure Chief Engineer Department of Public Works County of Hawaii 25 Aupuni Street Hilo, Hawaii 96720

Dear Mr. McClure:

P. 0. BOX 621

HONOLULU, HAWAII 96809

APR I 9 1991

Well Construction and Pump Installation Permit Application(s)

WILLIAM W. PATY

CHAIRPERSON

JOHN C. LEWIN, M.D. MICHAEL J. CHUN, Ph.D.

ROBERT S. NAKATA RICHARD H. COX

GUY K. FUJIMURA

MANABU TAGOMORI

DEPUTY

Transmitted for your review and comment is a copy of the following permit application(s):

Island Well Name Well No. Application Type

Hawaii Kohanaiki 1 4458-01 Well and Pump Hawaii Kohanaiki 2 4458-02 Well and Pump Hawaii Puako 4 5748-01 Well and Pump Hawaii Puako 5 5648-04 Well and Pump Hawaii Puako 6 5549-02 Well and Pump Hawaii HCEOC-Milolii 1154-01 Well and Pump Hawaii DHHL-Kawaihae Expl. 6448-02 Well

Please review the application(s) pursuant to your area of concern and submit your comments to us, orally or in writing, by ten (10) working days from date of letter.

NF:bm Enc.

Should you have any questions, please contact our Regulation Branch at

Page 82: application~ i~· ,~:,~P~'~------€¦ · linda lingle governor of hawaii state of hawaii department of land and natural resources commission on water resource management p.o.box621

State of Hawaii DEPARTMENT OF LAND AND NATURAL RESOURCES

Division of Water Resource Management Honolulu, Hawaii

MEMORANDUM

TO:

FROM:

SUBJECT:

Don Hibbard, Director Historic PreseiVation Program

Manabu Tagomori, Deputy Director Commission on Water Resource Managem

Well Construction and Pump Installation Permit Application(s)

Transmitted for your review and comment is a copy of the following permit application(s):

Island Well Name Well No. Application Type

Hawaii Kohanaiki 1 4458-01 Well and Pump Hawaii Kohanaiki 2 4458-02 Well and Pump Hawaii Puako 4 5748-01 Well and Pump Hawaii Puako 5 5648-04 Well and Pump Hawaii Puako 6 5549-02 Well and Pump Hawaii HCEOC-Milolii 1154-01 Well and Pump Hawaii DHHL-Kawaihae Expl. 6448-02 Well Kauai Fern Grotto 2 0221-02 Well and Pump Kauai Anahola C 0818-03 Well and Pump Oahu Kapolei Irr. C 2004-05 Well and Pump Oahu Kapolei lrr. D 2003-03 Well and Pump Molokai Molokai Golf 1 0901-02 Well and Pump Molokai Molokai Golf 2 1001-02 Well and Pump

Please review the application(s) pursuant to your area of concern and submit your comments to us, orally or in writing, by ten (10) working days from date of letter.

NF:bm Enc.

Should you have any questions, please contact our Regulation Branch at

Page 83: application~ i~· ,~:,~P~'~------€¦ · linda lingle governor of hawaii state of hawaii department of land and natural resources commission on water resource management p.o.box621

JOHN WAIHEE

GOVERNOR OF HAWAII

STATE OF HAWAII DEPARTMENT OF LAND AND NATURAL RESOURCES

COMMISSION ON WATER RESOURCE MANAGEMENT

Mr. Thomas Yamamoto Nansay Hawaii Inc. P.O. Box 111222

P. 0. BOX 621

HONOLULU, HAWAII 96809

APR I 8 1991

Kamuela, Hawaii 96 7 43-0020

Dear Mr. Yamamoto:

We have received your applications and filing fees for permits to construct and/or install a pump in the following wells:

ISLAND WELL NAME WELL NO. TMK

Hawaii Kohanaiki 1 4458-01 7-2-05:01 v-flawaii Kohanaiki 2 4458-02 7-2-05:01

Hawaii Puako 4 5748-01 6-8-01:36 Hawaii Puako 5 5648-04 6-8-01:36 Hawaii Puako 6 5549-02 6-8-01:36

We are reviewing the applications for completeness.

Should you have questions, please call the Regulation Branch of the Division of Water Resource Management at

tL .. UTAGOM~

NF:bm

WILLIAM W. PATY

CHAIRPERSON

JOHN C. LEWIN, M.O.

MICHAEL J. CHUN, Ph.O. ROBERT S. NAKATA

RICHARD H. COX GUY K. FUJIMURA

MANABU TAGOMORI

DEPUTY

Page 84: application~ i~· ,~:,~P~'~------€¦ · linda lingle governor of hawaii state of hawaii department of land and natural resources commission on water resource management p.o.box621

State of Hawaii DEPARTMENT OF LAND AND NATURAL RESOURCES

Division of Water Resource Management Honolulu, Hawaii r/r(;;if'

A.Pf( ! r '""I

MEMORANDUM

TO:

FROM:

SUBJECT:

Don Hibbard, Director Historic Preservation Program

Manabu Tagomori, Deputy Director Commission on Water Resource Managem

Well Construction and Pump Installation Permit Application(s)

Transmitted for your review and comment is a copy of the following permit application(s):

Island Well Name Well No. Application Type

Hawaii Kohanaiki 1 4458-01 Well and Pump Hawaii Kohanaiki 2 4458-02 Well and Pump Hawaii Puako 4 5748-01 Well and Pump Hawaii Puako 5 5648-04 Well and Pump Hawaii Puako 6 5549-02 Well and Pump Hawaii HCEOC-Milolii 1154-01 Well and Pump Hawaii DHHL-Kawaihae Expl. 6448-02 Well Kauai Fern Grotto 2 0221-02 Well and Pump Kauai Anahola C 0818-03 Well and Pump Oahu Kapolei Irr. C 2004-05 Well and Pump Oahu Kapolei Irr. D 2003-03 Well and Pump Molokai Molokai Golf 1 0901-02 Well and Pump Molokai Molokai Golf 2 1001-02 Well and Pump

Please review the application(s) pursuant to your area of concern and submit your comments to us, orally or in writing, by ten (10) working days from date of letter.

NF:bm Enc.

Should you have any questions, please contact our Regulation Branch at

Page 85: application~ i~· ,~:,~P~'~------€¦ · linda lingle governor of hawaii state of hawaii department of land and natural resources commission on water resource management p.o.box621

B i. KOHANAIKI WELL NO. 2 (445~-0~ Geologic Log by Glenn Bauer

Depth Interval (ft.)

160-180

180-190

190-200

200-210

210-220

220-240

240-250

260-290

290-300

300-320

320-330

330-350

350-390

390-400

400-410

Description

No sample co~lected

Mixture of gray and dark gray ·aphyric aa

Same as above, except dark gray aa clinker present

Mixture of brown and gray aa clinker

No sample collected

Unweathered brownish-gray aa

No sample collected

Sand size gray-red cuttings, minor amount of plagioclase feldspar present

Olivine-rich reddish sand size cuttings--aa (?)

Vitreous dark gray-red sand size cuttings, some olivine present

Same as above, except not vitreous

Mixture of dark gray-red aa clinker and dense gray-red aphyric aa

Dense gray aphyric aa

Mixture of dense gray aphyric aa and brown aa clinker

Dark gray feldspar-phyric aa, phenocrysts 1-2 mm long

Gray aa with minor plagioclase phenocrysts

Page 86: application~ i~· ,~:,~P~'~------€¦ · linda lingle governor of hawaii state of hawaii department of land and natural resources commission on water resource management p.o.box621

410-430

430-440

440-490

490-510

510-520

520-620

620-630

630-660

660-680

680-690

690-710

710-730

730-750

750-760

760-790

790-800

800-810

-Mixture of gray aa with minor plagioclase phenocrysts and brown scoriaceous pahoehoe

Dense gray aa with minor plagioclase phenocrysts

Mixture of dense gray aa with minor plagioclase phenocrysts and brown scoriaceous pahoehoe

Gray scoriaceous pahoehoe with plagioclase phenocrysts

Same as above, except brown pahoehoe also included

No sample collected

Gray sand size cuttings

Brown pahoehoe with minor olivine phenocrysts

Mixture of dark red-gray aa and dense gray aa containing minor olivine phenocrysts

Gray vesicular aphyric aa

Mixture of dense dark gray and medium gray aphyric aa

Sand size red-gray aa (?)-­minor olivine present

Vitreous sand size cuttings

Dark gray vesicular aa and aa clinker with limonite covering surfaces

Mixture of dense dark gray aa containing olivine phenocrysts and gray vesicular aa clinker

Mixture of dense gray aphyric aa and vesicular brown aa clinker

Same as above, except some clinker is vitreous

Page 87: application~ i~· ,~:,~P~'~------€¦ · linda lingle governor of hawaii state of hawaii department of land and natural resources commission on water resource management p.o.box621

810-820

820-830

830-850

850-870

870-890

890-900

900-910

910-920

920-930

930-950

950-

1000-1010

1010-1030

1030-1040

1040-1050

1050-1070

1070-1080

Dark gray sand size cuttings, some larger pieces of dense gray aphyric aa

Vesicular gray aa with minor phenocrysts of olivine and plagioclase

Sand size dark gray cuttings-­aa (?) some plagioclase phenocrysts

Dark gray vitreous pahoehoe with minor altered olivine phenocrysts--glass lining vesicles

Gray pahoehoe with minor plagioclase phenocrysts

Sand size red-gray cuttings with minor plagioclase phenocrysts

Dense gray aa with minor plagioclase phenocrysts

Dense gray aphyric aa

No sample collected

Dense gray aphyric aa

Vesicular red-brown aphyric aa

Dark gray slightly vesicular aphyric aa

Dense dark gray aa with minor olivine phenocrysts

Dark gray aphyric aa

Mixture of dense gray aphyric aa and dark gray aphyric pahoehoe

No sample collected

Dark gray aa and aa clinker

Gray aphyric aa, some cuttings are vesicular

Page 88: application~ i~· ,~:,~P~'~------€¦ · linda lingle governor of hawaii state of hawaii department of land and natural resources commission on water resource management p.o.box621

1080-1100

1100-1150

1150-1160

1160-1170

1170-1180

1180-1190

1190-1220

1220-1230

1230-1240

1240-1260

1260-1290

1290-1300

1300-1330

1330-1360

1360-1370

Same as above, except aa is dark gray

Dark gray aa with minor plagioclase phenocrysts < 1 rom long

Mixture of dense dark gray aphyric aa and brown vesicular pahoehoe

Brown scoriaceous pahoehoe, sample also contains minor amount of dense aa

Same as above, except orange­red scoriaceous cinder present

Dense dark gray aphyric aa

Mixture of brown aphyric aa and dense gray

Same as above, except brown pahoehoe also present with minor olivine phenocrysts

Same as above, except brown pahoehoe contains plagioclase phenocrysts instead

Mixture of brown aa and plagioclase-phyric gray aa-­phenocrysts 1-3 rom long

Mixture brown and gray plagioclase-phyric aa-­phenocrysts <= 1 rom

Plagioclase-phyric gray aa with laths up to 3 rom long

Same as above, plagioclase phenocrysts make up 15-20 % of the rock

Dark gray plagioclase-phyric aa with phenocrysts 1-2 rom long

Same as above, except some red-brown aphyric scoriaceous aa cuttings present

Page 89: application~ i~· ,~:,~P~'~------€¦ · linda lingle governor of hawaii state of hawaii department of land and natural resources commission on water resource management p.o.box621

1370-1380

1380-1390

1390-1420

1420-1430

1430-1460

1460-1590

1590-1620

1620-1640

1640-1650

1650-1660

1660-1670

1670-1690

1690-1700

1700-1710

1710-1720

1720-1730

1730-1740

Same as above, except plagioclase laths 3 mm long

Mixture of red scoriaceous pahoehoe and gray aa both are plagioclase-phyric

Mixture of dark gray aa (basalt?), light tan trachyte, and red altered {?) aa

Mixture light gray and black vitreous trachyte, and red plagioclase-phyric aa

Mixture of light gray trachyte and black basalt (?)

Light gray and dark gray vitreous trachyte--appears streaked

Mixture of trachyte, pahoehoe, and red altered basalt (?)

Mixture of trachyte, scoriaceous pahoehoe, and red altered rock--trachyte << basalt

Gray aphyric aa clinker

Sand size dark gray cuttings {basalt)--some trachyte cuttings mixed in

Dark gray aphyric pahoehoe

Mixture of dark gray pahoehoe and dense gray aa

Gray-brown aphyric aa

Dark gray sand size aa with olivine phenocrysts

Mixture of brown aa and gray pahoehoe

Mixture of gray pahoehoe and aa with some red cinder

Same as above, except red cinder not present

Page 90: application~ i~· ,~:,~P~'~------€¦ · linda lingle governor of hawaii state of hawaii department of land and natural resources commission on water resource management p.o.box621

1740-1750

1750-1780

1780-1800

1800-1805

1805-1815

1815-1820

1820-1825

1825-1830

1830-1840

1840-1850

1850-1860

1860-1875

1875-1880

1880-1885

1885-1890

Olivine-rich dark gray-brown pahoehoe

No sample collected

Dark gray aa with olivine phenocrysts up to 2 mm across

No sample collected

Mixture of dark gray aphyric aa and brown-red aphyric pahoehoe

Dark gray aphyric aa

Mixture of dark gray aphyric pahoehoe and gray aa

Same as above, except pahoehoe contains olivine phenocrysts

Dark gray aphyric aa

Mixture of dark gray pahoehoe and aphyric gray aa

Dark gray aphyric aa

Dark gray aphyric vesicular aa

Same as above, except some vesicular pahoehoe

Dark gray aa--sample contains "accidental (?) 11 cutting of trachyte

Dark gray pahoehoe transitional to aa with minor olivine phenocrysts

Page 91: application~ i~· ,~:,~P~'~------€¦ · linda lingle governor of hawaii state of hawaii department of land and natural resources commission on water resource management p.o.box621

, . State oC HawaJI .. "' Cv~IISSION ON WATER RESOURCE ~.IANAGEMENT

Department oC Land and Natural Reaourcu Division of Water Reaource Management

WELL COMPLETION REPORT

I

lHSTROCTlONS: Please print or type and submit completed report wlffilil30 days of well completion to tfie Division or Water • Land Development, P.O. Box 373, Honolulu, HI 98809, An as-built drawing o! the well and chemical analysis, tr available, should also be submitted, I( neceuary, phone HydrololrY, OeololrY S ectlon Cor assistance,

A. STATEWELLNO, 4458-01 WELL ,NAME Kohanaiki Well No. 1 ISLAND Hawaii

B, LOCATION North Kana TAX MAP KEY -------------------c. WELL OWNER Nansay Hawaii, Inc.

D. DRILLING OR PUMP INSTALLATION CONTRACTOR Water Resources International, Inc.

E. F. G.

TYPE OF RIO Spenser-Harris Rotary DATE OF WELL COMPLETION Ol/08/91

GROUND ELEVATION (mel) 1799.05 tt.

DRILLER S. Gonsalves DATE OF PUMP JNSTALLATION __ n_a ______ _

Top of Drilling Platform {mal) 1806.69 ft. ·· Height of drilling platform above ground surface 7. 64 ft, Bench mark and method used to determine il'ound elevatlon __ ...;:1...:.7.-:9..;;:9;..:.•..;;:0.:::5_ ft. (top of I beam)

H. TOTAL DEPTH OF WELL BELOW GROUND 19601

I.

J.

----------------------HOLE SIZE: 21 tnch d!a. from 0 ft. to 1765 Ct. below ground 17! Inch dla. from ~1'!:!:'76':""5::---ft. to ~11"')18~4""0['""--ft. below ground 12 Inch dJa. from I8;?i:0 ft. to 1960 Ct. below ground

CASINO INSTALLED: lA ln. J.D. x 14 ln. J.D. X

Type of perforation

3/8 ln. wall solid section to ]800 ft. below ground 5/J 6 ln. w'f.lu~':..)!f~ated section to l850 ft. below ground

K. ANNULUS: Grouted from 0 ft. to 600 Ct. below ground & 1430

1 to 1755

1

Gravel packed from nnn f"t-,...,tr-o--~1430 ft. below ground

L. PERMANENT PUMP INSTALLATION: na Pump type, make, aerial No·~--,---------------------------­Motor type, H.P., voltage, r.p.m. Depth of pump Intake utting ----n ft. below Depth of bottom of airline ft. below ----

Capacity ---- gpm

wfilcfi elevation ls lt. which elevation l• ft.

M. PROPOSED USE

N. INITIAL WATER LEVEL1788.65ft, below ground. Date and time of measurement 5/30/90

0, INITIAL CHLORIDE 17 PPI'I!I · Date and time of sampling 5/30/90

P. PUMPING TESTS: Reference point (R.P.) used: ___ which elevation le ft.

Date ............................................................ Date .......................................................... .. Start water level ................................... ft. below R. P. Start water level ........................................... ft. below R. P. End water level ..................................... ft. below R. P. End water level ............................................. ft. below R. P. Depth of well ......................................... ft. below R. P. Depth of well ................................................. ft. below R. P.

Elapsed Rate Draw· Cl· Temp. Ela(lsed Rate Draw· Cl· Temp. Time (hours) (gpm) down (ft.) (ppm) •f Time (hours) (gpm) down (ft.) (ppm) · F

.............. to .............. .............. .............. .............. .............. . ............. to .............. .............. .............. .............. .. .......... ..

.............. to .............. .............. .............. .............. .............. . ............. to ..................................................................... .

.............. to .............. .............. .............. .............. .............. .. ............ to ..................................................................... .

.............. to ........ 9.~:r.I\.+.N ... f.E91'1 ... Q~~.R .............. .............. .. ............ to .............. .............. .............. .............. .. .......... ..

.............. to .............. .............. .............. .............. .............. . ............. to .............. .............. .............. .............. . ........... ..

.............. to .............. .............. .............. .............. .............. .. ............ to ..................................................................... .

Q. ' DRILLER Is r.o::;: Water Level Water Level

Depth, ft. Rock Description & Rema{kS ft. Depth, ft. Rock Description & Remarks ft. ........... Q. to ..... ~:?.Q.. .9.~1-.~~.~E.Y.! .... ~E!?.~~.~ ... ~ .. :::.... .............. .. ............ tcf .............. .................................................... .. .......... .. ...... ;?,.?,Q; to ...... ;?.9.Q.. ..P.~E.~~ ... ~.9.E~.~~.~.9.!:l ........ Y:..... .............. . ............. to .............. .................................................... . ............ . ...... 2.9.Q. to ..... §:?.~.. .9.~1-.~~.~E.Y.! .... ~E.<?.~~.~ .. ~ .. :=:.... .............. , .............. to .............. .................................................... .. ........... . ...... ~.?.~. to ..... §.?.2 .. -~---~-~-~~~---~~Y.~.~~.................. .............. . .......... .-:. to .............. .................................................... ··············

675 to 755 Dense formation to .............................................................................. . ...... ~g:s· t ..... s.4o" ·ciTiii<er_.x.................................. .............. .. ............ t · ............ .. 0 . • . .. .. ..• .............. .............. 0 ......................................... , ..... ..

...... 'f34o· t ..... 8.52 .. ne'ii8e""f"CiriiiciEia'ii. ... .... t d 9°

44• 22" ............. .

.............. 0 ...... '4 ....... "i5e"ii8e"Ioriiiatioii'""""""""' .............. . ............. 0 ........... Latrtu e I o

::J~:~~: ~~ :::b:~~:: :B~f~:::8i:~Y.?.~~:f::::~~:~~:::f.?~f::::::::: :::::::::::::: ~~ :::::::::::. Longrtude 155 58 51 :::::::::::::: ... J.§.?.Q .. to ... ~.§.~~-· .~9.~E.~ ... !.~~!: ... ~.~~~.~E ... ~.~.~. .............. ...~ .......... to ............ Well No. 4 4 58- 0 I ............. . ... J.§.~~. to ... !~.?.Q ... .t'!.~.~.~ ... ~.<?.f~.! ... J?.?.!.'.?.~~ ... ~.~.Y.~ .. :.~.C::.~... ... ........... to ................................. :................................ .. .......... ..

REMARKS: ........................................................................................................................................................................................... ,.

S u bmlt ted by (print > __ K_a_t_h_y_W_a_t_a_n_a_b_e ______ _

~'~ .. Slgnature __

11_-+---,r...-r-------~-------

Title ____ s_e_c_r_e_t_a_r_x _________ _

Date __ M_a_r_c_h_2_o_,_1_99_1 _______ _

Page 92: application~ i~· ,~:,~P~'~------€¦ · linda lingle governor of hawaii state of hawaii department of land and natural resources commission on water resource management p.o.box621

HAWAII, INC.

.,,··.:..u

J l~

. "; z,jJH March 19, 1991

Division of Water and Land Development Deparment of Land and Natural Resources P.O. Box 373 Honolulu, Hawaii 96809

RE:

Dear Sir:

APPLICATIONS FOR PUMP INSTALLATION PERMIT KAU WELLS 1 AND 2 LANDS OF KA 'U, NORTH KONA, HAW All

Please find enclosed applications for pump installation permits for Ka'u Wells 1 and 2 and a check for $50.00 ($25.00 per application).

If you have any questions, please call. Thank you.

Enc.

THY/knn

HONOLULU OfF:Ci

Sincerely,

~~~ ~

Thomas H. Yamamoto, P .E. Chief Operating Officer

S!G iSLNJD Ofi-IC i

Page 93: application~ i~· ,~:,~P~'~------€¦ · linda lingle governor of hawaii state of hawaii department of land and natural resources commission on water resource management p.o.box621

.· .. :· .·• <

~ ~ r,

~

·. ' .::

NANSAY HAWAII, INC. SUITE 727 BOX 111222

KAMUELA, HAWAII96743-0020

·.· .. ' .···

FIRST HAWAIIAN BANK KAMUELA BRANCH KAMUELA, HAWAII

59-101/1213

.. ·· .. •·

1628

March 18, 1991

' PAY TO THE ORDER OF DEPT. OF LAND & NATURAL RESOURCES 50.00 _________________________________________________________________ $ ____________ __

____________ *_*_*_*_*_* __ F_I_FT_Y __ A_N~D __ N~0~/_1_0_0_*_*_*_*_* ____________________________________________ DOLLARS

MEMo Pump installation permits-Kau Wells 1 & 2 111 0 0 I. b 2 8 111 I: • 2 • :1 0 • 0 • 5 I:

--·pu""o ,;,~ ·· · 44(:'8 ~cn_/02.

·.'

·:··

Page 94: application~ i~· ,~:,~P~'~------€¦ · linda lingle governor of hawaii state of hawaii department of land and natural resources commission on water resource management p.o.box621

State of Hawaii COMMISSION ON WATER RESOURCE MANAGEMENT

Department of Land and Natural Resources Division of Water Resource Management

APPLICATION FOR

WELL CONSTRUCTION PERMIT

...L PUMP INSTALLATION PERMIT ~I+AN p,.\ \(_\

(~Well 2, #4458-02)

1. WELL LOCATION

Island Hawaii Tax Map Key __ 7_-_2_-5_=_1 ___ _

Address Kau. North Kona, Hawaii

(Attach a USGS map (scale 1"•2000') and property tax map showing well location referenced to estabUshed property boundaries.)

2. WELL OWNER LANDOWNER

Firm. Name Nansay Hawaii, Inc. Firm Name same as well owner

------------------------------Contact Person Thomas Yamamoto Contact Person

Address Address p Q Box 111222

Kamuela, HI 96743-0020 ---------------------Phone

----~~----------Phone

------------------3. PROPOSBD CONTRACTOR POR: CJWell DrUUng· ClPu~p Installation

not determined at this time Phone Name

Address ----------

Contractor's License No. ---------------------------

4. PROPOSBD WORK

0 Drill New Well CJ Deepen 0 RedrlU c::J Alter C1 Seal c::J Abandon UJ Install New ~p CJ Replace Pump C] Modify Pump

(Briefly describe the proposed work and ftU in the diagram on the back of this. form.>

5. PROPOSBD USB £]]Municipal (including hotels, stores, etc.) OMtutary DDomestic (individual, noncommercial water systems) Oindustrial Olrrigation (specify) C]Other (specify) ___ _

6. PROPOSED AMOUNT OP WITHDRAWAL

7. PROPOSBD PUMP INPORMA TION Pump Type: OVertical Turbine l]7Submersible OCentrtfugal Motor: ODiesel · CJG .. as l!7Electric: ,_,..;;4~2~0 _____ .Rated Horsepower Rated Pump Capacity 700 gallons per minute (gpm)

• • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • .....

For Official fiss Only: Field Checked ~y _________ _ Date _____________________ __

Landowner (pri~t) Nan~ay Hawaii, Inc.

~ t II .. F Signature -~----~~~--~--------------­Date -:< _ S' _

I

Latitude ____ _

Longitude. ______ _ Hydrologic Unit -------­State Well No. 44'5"6 -DZ­~.d t1Aa f No. !-1 - 1-

Page 95: application~ i~· ,~:,~P~'~------€¦ · linda lingle governor of hawaii state of hawaii department of land and natural resources commission on water resource management p.o.box621

B riefiy describe the proposed work:

Installation of a 700 gpm submersible pump

Elevation at top of casing ft., mal. -----

~ :.. .. Cement \: Grout" 1780 ft.---1---t.-.1

Hole Dia. 24 in. __ __....,. ..

Total Depth 1890_ ft. _ _..,.

Rock Packingnone ft.

PROPOSED SECTION OF WELL

Ground Elev. 1800 ft •• mat•

SoUd Casing: Material Steel

Le~-~ 1810 ft. "-Diameter 18" i.D. in. Wall thickness 0.3725 in.

· Casing: I /Perforated

Material -~S;:.:;t;,:;;e~el~------Length ___ 4_o _______ ft.

I . Diameter 18" I.D. in.

I Wall thickness 0.3125 in.

sq. in./~. F. Openings

~Open Hole:

----

Length 40 ft. Diameter 17 in. -------------

•Approximate elevation at time of filing application. Final elevation (mal) by a surveyor licensed by the State must be submitted at start of construction.

Page 96: application~ i~· ,~:,~P~'~------€¦ · linda lingle governor of hawaii state of hawaii department of land and natural resources commission on water resource management p.o.box621
Page 97: application~ i~· ,~:,~P~'~------€¦ · linda lingle governor of hawaii state of hawaii department of land and natural resources commission on water resource management p.o.box621

State of Hawaii COMMISSION ON WATER RESOURCE MANAGEMENT

Department of Land and Natural Resources Division of Water Resource Management

APPLICATION FOR

_ WEtL CONSTRUCTION PERMIT i::::ol-+A-NAIK-1

....2L PUMP INSTALLATION PERMIT f*mt Well 1, #4458-01)

l '''

INSTR0eti0N8: Pi11M prtnt or type 1nd 11nd completed 1ppiJC•IIon itth 1tt1ehmenta to the blrielon of Water and Cand Development. P.O. Box 313, Honolulu, H1w1JI 11101. Applleatlon muat be IC:COII!pudld by 1 non•refundlble nunr (H o( 125 00

to the Department of Land and N1tur1J Re10ure... CP'Wnr '" wiJvld for pvemment arenc:t11 ) If nee1111..., h · Hydrolop/OeoiO(Y Sec:tton Cor aeelatanee. ' .,. P one

1. WELL LOCATION

Island Hawaj i Address

Tax Map Key 7-2-5:1

Kau North Kona Hawaii

(Attach a USGS map (scale 1"=2000') and property tax map showing well location referenced to established property boundaries.)

2. WELL OWNER LANDOWNER

Firm Name Nansay Hawaii, Inc. Firm Name same as well owner

---------------------------Contact Person

Address

Contact Person Thomas Yamamoto

Address p.o. Box 111222

Kamuela, HI 96743-0020 --------------------------------Phone -~8~8:.:.5--5~3~0:.:;:0 ___ _ Phone ------------------

3. PROPOSED CONTRACTOR POR: 0Well Drtll1ng· 0Pump Installation Name not determined at this time Phone ---------Address

4. PROPOSED WORK

Cl Drtll New Well c:J Alter G:J Install New ~p

Contractor's License No.

0 Deepen CJ Seal r:::J Replace Pump

0 RedriU c:J Abandon r:::J Modify Pump

(Briefly describe the proposed work and fill in the diagram on the back of this. form.)

5. PROPOSED USB lEi Municipal (including hotels, stores, etc.) OMiUtary ODomestic (individual, noncommercial water systems) Oindustrial Oirrlgation (specify) OOther (specify) ___ _

6. PROPOSED AMOUNT OP WITHDRAWAL _ 1 __ m;;;:.gd _____ p;Heuxpwx~x

7. PROPOSED PUMP INFORMATION C1 Centrifugal Pump Type: OVertical Turbine a:;'Submerslble

Motor: ODlesel . OOas auElectric: 420 Rated Horsepower Rated Pump Capacity 700 gallons per minute ( gpm)

• • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • •

Well Owner

For Offiaiat l/se Only: Field Checked By ______ _ Date ________________________ __

Latitude ____ _

Lort.gi tude ____ _ Hydrologic Urt.it -----­State Well No. 44-.S@ --Dl Qu~ Mc.p- !I 0. /-1 - r

Page 98: application~ i~· ,~:,~P~'~------€¦ · linda lingle governor of hawaii state of hawaii department of land and natural resources commission on water resource management p.o.box621

Briefly describe the proposed work:

Installation of 700 gpm submersible pump

AS-BUILT x~0£Mmx SECTION OF WELL

Elevation at top of casing ----- ft •• msl.~

.-._.....

Cement Grout 1747 ft.---..-,... ..

Hole Dia. 21 in. ----t ...... .,

Total Depth ~- ft. --e-t

Rock Packing N/ A ft.

__ G;;;;.=-=.;rou;;.:n;.;.;d;-_;E;;.:l;.;;;e..;.v..;.. __ 1_ 79;...;9_ ft. • msl•

SoHd Casing: Material Steel

Le~-~---1_7_92 _____ ft.

Diameter 14" I. D • in .

Wall thickness ___;,'..;;..37...;S _____ tn.

/x/Screen

V, Casing: I /Perforated

Material Steel

Length ---~------ft. I Diameter 14" I • D. in •

I Wall thickness _.;..;· 3;;...;1.;;;.25;;...... __ in.

Openings

~Open Hole:

----sq. in./L.F.

Length 110 ft.·

Diameter 12 in. _ _,_,_,_,_, __ _,_,_

• Approximate elevation at time of fUing application. Final elevation (msl) by a surveyor licensed by the State must be submitted at start of construction.

Page 99: application~ i~· ,~:,~P~'~------€¦ · linda lingle governor of hawaii state of hawaii department of land and natural resources commission on water resource management p.o.box621

f -)......(. . ..

I I

Page 100: application~ i~· ,~:,~P~'~------€¦ · linda lingle governor of hawaii state of hawaii department of land and natural resources commission on water resource management p.o.box621

WATER RESOURCE ASSOCIATES Hydrology • Geology • Engineering

Mr. Gordon Akita Manager-Chief Engineer Division of Water Resource Management Department of Land and Natural Resources P.O. Box 373 Honolulu, Hawaii 96809

Dear Mr. Akita:

Notification of Start of Construction for Kau Well 2 and Ouli Well 2, North Kona, Hawaii

This is to confirm our verbal notification to Mr. Ed Sakoda of the construction operation schedule for drilling of the following wells:

Kau Well 2, #4458-02- Started on January 14, 1991.

Ouli Well 2, #6146-01 - Contractor has mobilized and will start construction the latter part of March 1991.

Sincerely,

DANLUM

cc: Mr. Thomas Yamamoto, Nansay Hawaii

1124 Fort Street Mall, Suite 212 • Honolulu, Hawaii 96813 • (808)

!) (

Page 101: application~ i~· ,~:,~P~'~------€¦ · linda lingle governor of hawaii state of hawaii department of land and natural resources commission on water resource management p.o.box621

MEMORANDUM FOR THE RECORD

March 8, 1991

From:

Subject:

GlennBau~

Review of Kau (Kohanaiki) Weill (4458-01) Well Completion Report by Water Resource Associates

My comments regarding this report are as follows:

1) Hydrology

Even though the head is 10 + feet msl and the aquifer may be partially confined, I do not think the well is immune from increasing chlorides due to heavy pumpage. Increase in chloride content will probably occur more readily when other sources in the vacinity begin to pump.

Future pumping from our Kalaoa Well may diminish the amount of water that will spill over (?) or pass through the geologic structure that causes the static head to stand at elevation 238 + feet msl. Therefore, less groundwater will be available to the Kohanaiki Well field and other sources nearby.

2) Sustainable Yield

If the average rainfall (based on our isohyet maps) above the well is 35", then a one mile-wide strip, with the well in the middle, would have to be about 3.8 miles long to equal 6.4 mgd of rainfall. A strip this long put a portion of it north of the northwest rift zone of Hualalai. Using a realistic ET value of 73 %of rainfall (Giambelluca) for this isohyetal zone, infiltration into this strip is only 1. 7 mgd. Sustainable yield will be some fraction of this recharge. Comparison with Kahaluu Shaft does not make sense since the rainfall mauka of the shaft is much greater and ET is suppressed, resulting in greater recharge.

Utilizing Mink's equation for sustainable yield for basal lenses with heads up to 10 feet, a D/1 value of .44 is used (Water Resources Protection Plan, p. B-3). The resulting sustainable yield would be about .75 mgd. The equilibrium head would drop from the initial head of 10 feet to 7.5 feet. This number is valid for the one mile-wide strip. Depending upon future development the amount may be adjusted up or down. Several of the Huehue Ranch wells are within half a mile of Kohanaiki Weill, including yet-to-be­drilled Kohanaiki Well2.

I calculated the approximate transmissivity of the well at 183,000 ft 2 /d by using pump test data provided in the report. Without any transmissivity data from the Huehue Ranch wells, it will be difficult to compute regional drawdown for the unconfined basal aquifer after development of all wells in the area, and to make an informed judgement to the total allowed draft for the region.

Another method to estimate the effect of pumpage on the lens is to first calculate

Page 102: application~ i~· ,~:,~P~'~------€¦ · linda lingle governor of hawaii state of hawaii department of land and natural resources commission on water resource management p.o.box621

specific flux through the Keauhou Aquifer System. Total recharge for the system has been calculated to be 87 mgd or 11.6 X 10"' 6 ft-1/d. Total coastline length is approximately 21 miles or 110,880 feet. Therefore specific flux, q, is:

q = (11.6 X 10"' 6 ft3/d)/(110,880 ft)

= 105 ft3/ft!d

Total flux per mile is equal to about 5.5 X 10"' 5 ft3;d or 4.1 mgd. Employing the analysis used in the Kahakuloa Water Study (State Report R-54, pp. 65-68) to examine the extent and structure of an unconfined basal lens, and taking the data from Kohanaiki Weill, an assumed q can be computed for coastal discharge below the well.

According to the Kahakuloa Water Study, the parabolic upper surface of a basal lens is defined by:

h2 = ax (1)

where h is head, x is the distance (in feet) from the coast, and a = 2q/ gk, q equal to specific flux, k is hydraulic conductivity, and g is the Ghyben-Herzberg constant of 41. For the Kohanaiki well, T ~ 183,000 ft 2 /d and k = 1123 ft/d based on partial penetration of 163 feet. Rearranging equation 1:

q = gh2 k/2x (2)

Substituting values into this equation:

q = 41(10.4 ft) 2 (1123 ft/d)/2[4.7(5280 ft)]

= 100 ft3/ft/d

A value that is close to the calculated regional specific flux.

Assume that the 1.7 mgd (2.3 X 10"' 5 ft3/d) estimated total recharge for the one mile strip is withdrawn, then the total flux through that one mile strip is reduced to 2.3 mgd which computes to q = 58 ftl/ft/d. Substituting back into equation 1, then:

h 2 = 2(58 ftl/ft/d)/41(1123 ft/d)*[4.7(5280 ft)]

h = 7.9 ft

The aquifer will not behave as a discrete one mile strip and the reduction of specific flux will not be as great. However, if all wells are on line and reducing flow to the coast, the basal lens will shrink, effectively reducing flux. Any reduction in head will cause the transition zone to react accordingly.

Page 103: application~ i~· ,~:,~P~'~------€¦ · linda lingle governor of hawaii state of hawaii department of land and natural resources commission on water resource management p.o.box621

3) Reccommended Pump Capacity

The reccommended pump capacity of 700 gpm seems to be reasonable. However, if Kohanaiki Well2 proves to be a good producer, we may need to adjust total water withdrawn between the wells. Distance between these wells is less than 2000 feet.

Page 104: application~ i~· ,~:,~P~'~------€¦ · linda lingle governor of hawaii state of hawaii department of land and natural resources commission on water resource management p.o.box621

;'-iEO WATER RESOURCE AS-SOCIATES Hydrology • Geology • Engineering

Mr. Manabu Tagomori Deputy Director Commission on Water Resource Management Department of Land & Natural Resources State of Hawaii Honolulu, Hawaii

Dear Manabu:

February 18, 1991

Well Completion Report, Kau (Kohanaiki) Well1 (4458-01)

Submitted herewith is the well completion report for Nansay Hawaii's recently drilled Kau (Kohanaiki) Well 1, North Kona, Hawaii.

The well was pump tested for four days at a constant rate of 700 gpm with a stable drawdown of 2.3 feet and chloride content of 35 ppm.

If you have any questions, please give me a call.

Sincerely,

DANLUM

En c. cc: Mr. Tom Yamamoto, Nansay Hawaii

1124 Fort Street Mall, Suite 212 • Honolulu, Hawaii 96813 • (808)

Page 105: application~ i~· ,~:,~P~'~------€¦ · linda lingle governor of hawaii state of hawaii department of land and natural resources commission on water resource management p.o.box621

WATER RESOURCE ASSOC .. TEL: Feb 01,91 14:54 No.OOS P.Ol

oenth (ft.} Emm. ..19..

645 665 665 68S 685 ?OS 705 92.S

925 94.~ 945 lOOS ] 1045 1065 1063 110~ 1105 1185 1185 1325 132S 1465

1465 160S

1605 1645

1645 1705 170S 1765 176:l 1850 1860 1868

1883

1860 1890

1893

1890 1900

1908 1910

1920 1930

TO: 11~.., /!;r.>t(,C r. r J bwfl!.. t'Yl LOG OF CUTnNGS

Kau Wclll (4458-01). North Kona FROM: W8ler Resource Associatefl (Depths referenced to RKB = 1806.7 ft.)t-___ F_ax_:_5_28_-0S_os __ P_h_: 5_2_8..00_7

By Dan Lum ' Total Pago:1 fMe.d: I

MeRsage:

BASALT; Dk gray. dense BASALT: Dk ~ay. dense mixed with fine cuttings BASALT: Gray, deme and sliidltly reddish gray fine cuttings BASALT: Gray, dense and reddim brown vesicular cuttinj!s.

Oltvlnes at 745 • 845. More dense cuttings at 845 • 885 BASALT: Oray to lt. gray, dense BASALT: Dk gray, dense and reddish brown, vesicular BASALT: Dk 8f&y, dense BASALT: Chay, dense, some platy breaks BASALT: Gray, dense and reddich gray, ves:icular BASALT: Oray and reddish gray, vesicular to deme BASALT: Oray, dense and reddish gray, vesicul&U" TRACHYTE:• Lt. gray, dense and reddish gray vesicular. ·

Son~e clean quartz-looking crystals BASALT: Gray, dense with some reddish J:fllY vesicular

cuttings and same ay&tala (probably from above). A few green oUvines at 1SR5-160S

BASALT: Gray, dense cutUngs mixed wiLh rcddilih brown finely vesicular cuttings. Green olivines at 1625~ 164 S

BASALT: Gray. dense and reddish brown, vesicular cuttings BASALT: Gr.t.y and reddi~h. dense to vesicular BASALT: Gray, dense, so1nc platy at 1785-1850 BASALT: Oray, dense to vcsicullll' with some reddish brown,

finely vesicular cuttings BASALT: Reddish brown, slightly to modcratly vesicular with

some dk gray dense chips and grayish tan mincrnl coatina "ea:ioles

BASALT: Rcddiah brown and dk gray, dcnll8 to dightly ve!llcular

BASALT: Reddish brown, slightly w moder&ely vesicular. Some elk gray, dense cuttings

BASALT: Reddish brown and dk gray, dense to slightly veiicular. Mo.:tly 1.&-s than 1/4" size cuttings

BASALT; Reddish brown, finely vesicular cuulngs up to 1/2" size. Gray and reddish brown, clen~e cuttings less thun 1/4" Rile

BASALT: Reddish brown. moderately vesicular. Pumiceous cuttings up to l/2'' size

*Based on personal communication, 0. Bouer Note: Cuttings recovery not complete.

Page 106: application~ i~· ,~:,~P~'~------€¦ · linda lingle governor of hawaii state of hawaii department of land and natural resources commission on water resource management p.o.box621

s ;\ y ("""" ~.::·· i ,_ ... "".:-- ~

"- '""" _,_ -! l ,__--_,

B- 'ftfc;g- o z_

k ~\ ~'jt, ' k ( 2

January 14, 1991 91 J ~.N 22 AiO : 5 4

. MAKAULA SUBDIVISION RESIDENTS Kailua-Kona, Hawaii 96740

RE: KAU WELL DRILLING AND PUMPING PHASE II

Many of you have probably already noticed our first well project on the property adjacent to your subdivision. Some may have already heard the noise generated by the initial stages of the drilling. Please accept our apologies for any disruption we may have already caused. This is to inform you that the initial drilling and testing stages of our second well which is located closer to your subdivision than the first, will begin Tuesday, January 15, 1991.

We have instructed our contractor to work only between the hours of 7:00a.m. and 6:00 p.m. on weekdays and between 9:00a.m. and 6:00p.m. on weekends. In approximately 4 months, we will be casing the well which will require us to work between 6:00a.m. and 10:00 p.m. one day only. Also at completion of the well we will be required to perform a 24 hour test pump for approximately 4 - 5 days.

We will notify each of you prior to the casing day and the 24 hour test period. If you have questions regarding the project, please do not hesitate to give our office a call. We are prepared to make every effort, within the given limitations, to make this process as painless as possible for everyone concerned. We sincerely hope that the water well project will be of minimal inconvenience to each of you.

In order to make it easier for us to keep each of you up to date on our progress and provide you with information regarding upcoming important dates, please return the enclosed self­address, stamped envelope with your name and address. Also, if you know someone in the area that we have missed, please let us know so that we may properly inform everyone.

Our sincere mahalo for your patience and cooperation.

Aloha,

Rebecca Kwiatkowski Director of Marketing & Public Relations

cc: H. Silva, Kona Police Department B. Clay, Water Resources International

Page 107: application~ i~· ,~:,~P~'~------€¦ · linda lingle governor of hawaii state of hawaii department of land and natural resources commission on water resource management p.o.box621

Bobby Macomber Pastor

The Vineyard Christian Fellowship P.O. Box 144 • Kailua-Kona, Hawaii 96745 • Phone

NANSAY HAWAII INC. KAMUELA, HAWAII 96743-0020

RE: KAU WELL DRILLING AND PUMPING PHASE 11

) j

I have receive your letter from one of your managers, R~ndy Foilitz on January 15 the day you have planned to begin drilling.

A week prior to the l5th I spoke to one of your manager~ who wae on the sight laying out the footing for the cement pad where the drilling wiil take place. I do not remember his name.

But in our conversation I have expressed my concern of the noise that the drilling work will make and my interest in the time you will start in the morning and finish. He mention that we will get together with the other residence to work together towards a time satisfactory to all in the Makaula Subdivision.

Secondly he mention that he would put up a wall to sheild of the noise between my home and the dr]lling rig since my home is only about 130 feet away. My bed rooms faces your drilling rig. Today is the 17th and nothing he has promised has happen. As a Pastor I work out of my office adjacent to my home and my day starts at 6a:m in the morning. From 6 to 8a:m I use this time to study and pray and then I attend to the church affairs. To be reasonable with your work 7:30a:m will help me a lot and stop at 5:30p:m.

You have also mention in your letter of work you will be doing at nights. This is going to cause a major problem with our privacy to get any sleep. When you were running your pumps all night at phase 1 which is about 2000 feet away I could here the noise so clear and loud, can you emagine what it would be like right next tc. .m:z.· r.om&. Put yc•u.r.:;elf ll1 my pc:·sitivn aHd how :you would teel.

I am prepared to contact the State of Hawaii Department of Land and Natural Resources to let them know of my situation and will give them a copy of this letter.

I understand that phase 1 took 1 year to finish by your manager. I hope we can work out a solution to this problem, without making our lives miserable for a year.

Page 108: application~ i~· ,~:,~P~'~------€¦ · linda lingle governor of hawaii state of hawaii department of land and natural resources commission on water resource management p.o.box621

id::CEfVEO WATER RESOURCE ASSOCIATES Hydrology • Geology • Engineering

Mr. Manabu Tagomori Deputy Director Commission on Water Resource Management Department of Land & Natural Resources P.O. Box 373 Honolulu, Hawaii 96809

Dear Manabu:

! P2:Js

DfV. Of WAlER & lAND Cf ~ f.LOPMENT

.August 7, 1990

We are pleased to enclose for your personal information a copy of "Prospective Well Sites Between Palani Junction and Kahaluu for Kohanaiki Project, North Kana, Hawaii" prepared for Nansay Hawaii. We look forward to briefing you further about Nansay Hawaii's preliminary plans for water development in west Hawaii.

Also enclosed is a copy of a memo on the July 20th meeting with the Hawaii Department of Water Supply. If you have any questions, please let me know.

En c. cc: Mr. 'Thomas Yamamoto,

Nansay Hawaii

Sincerely,

DANLUM President

1124 Fort Street Mall, Suite 212 • Honolulu, Hawaii 96813 • (808)

Page 109: application~ i~· ,~:,~P~'~------€¦ · linda lingle governor of hawaii state of hawaii department of land and natural resources commission on water resource management p.o.box621

WATER RESOURCE ASSOCIATES Hydrology • Geology • Engineering

August 1, 1990

MEMORANDUM FOR THE RECORD

FROM: Dan Lum

SUBJECf: Meeting with Department of Water Supply to Discuss Prospective Well Sites for Kohanaiki Project. North Kona. Hawaii

On Friday, July 20, 1990, a meeting was held in Bill Sewake's office to discuss Nansay Hawaii's prospective well sites and interest in developing new well sources in cooperation with the Department of Water Supply, in order to provide water for Nansay Hawaii's Kohanaiki and Kau projects. Present at the meeting were Bill Sewake, Quirino Antonio, Kiyoshi Takasaki, Tom Yamamoto, Fred Yamashiro, and myself.

Tom explained that Nansay Hawaii needs potable water for its Kohanaiki and Kau projects and, working with the Department, would like to locate new well sites and develop new well sources that could be added to the Department's water system in return for water service to Nansay Hawaii's two projects. Tom explained that he would need a small amount of water during construction activities, but that about 1.2 mgd would be needed in late 1993, for a planned hotel at Kohanaiki. Approximately 2.5 + mgd would ultimately be needed for Kohanaiki and another 2.5 + mgd for Kau. At 1/2 mgd per well, Bill indicated that might require as many as 10 wells.

Bill described current plans and drilling activities in the North Kana area as follows:

1. Palani Junction -The Department has awarded a contract to WRI to drill a well southeast of Palani Junction. If the well is successful, plans are to drill a second well about 3000 ft. south on Greenwell property with possibly a third well in between the two. Transmission would be along an old government road easement.

2. Liliuokalani Trust - About 4000 ft. south of the Greenwell site, Liliuokalani Trust probably will want to develop ground water for its land.

3. Haseko - About 4000 ft. south of the Liliuokalani Trust area, Haseko plans to drill a well at the Department's 0.05 mg tank site. Their water needs are small.

4. Waiaha Tank Site - About 10,000 ft. south of the Waiaha tank site, the Department plans to drill a well.

1124 Fort Street Mall, Suite 212 • Honolulu, Hawaii 96813 • (808)

Page 110: application~ i~· ,~:,~P~'~------€¦ · linda lingle governor of hawaii state of hawaii department of land and natural resources commission on water resource management p.o.box621

Memorandum for the Record -2- August 1, 1990

5. Pahoehoe Site - The Department is drilling a well about 7000 ft. north of the Kahaluu well field. Unexpectedly, the well has preliminarily tested at about 300 ppm (250 ppm is potable water limit). A 250 gpm pump test will be performed. Head is reported to be 5.6 ft.

6. HFDC- Between Kalaoa and Palani Junction, exploratory well sites have been identified for HFDC's housing project at Kealakehe.

Bill indicated that south of Kahaluu, most of the land is owned by Bishop Estate and that they are reluctant to provide well sites. The Department has future plans for a well at or near their Honalo tank site. A new well source there could relieve some of the South Kona demand for water from the Kahaluu sources which, in turn, would free a corresponding amount of Kahaluu water for service to North Kona. Nansay Hawaii probably could participate in a Honalo source development.

Bill indicated that the size of a well site was about 3/4 acre for one or two wells and a control tank, and about one acre for one or two wells and a storage tank.

Due to the uncertainties of developing wells in the thin basal lens of Kona and determining their sustainable capacities based on short-term pumping tests, Bill was unable to make any commitment on Nansay Hawaii's prospective well sites and their estimated capacities. However, Bill concurred with Nansay Hawaii taking the risk to acquire the well sites listed below and drill and test a well on each site, before discussing and committing to any source agreements. Agreement on drilling a second well at each site would depend upon a review of the production and salinity record (about a year or less) of the first well. Integrating any new well sources developed by Nansay Hawaii would be -discussed later when more definitive information is available.

1. Kalaoa North - This site is located half way between Kohanaiki Well 2 and the State's Kalaoa well just below the 1800 ft. elevation. Bill indic.ated that a property owner may be willing to negotiate a well site provided some water is available for his needs. ·

2. Waiaha North - This site is about 4000 ft. north of the Department's planned Waiaha well site mauka of Mamalahoa Highway.

3. Waiaha South - This site is about 4000 ft. south of the Department's planned Waiaha site, preferably on the mauka side of the highway.

4. Honalo Tank Site - The Department has been searching for a site close to their Honalo tank site. Development of a well source here could be credited to Nansay Hawaii for relief of water deman on the Kahaluu source.

DANLUM

Page 111: application~ i~· ,~:,~P~'~------€¦ · linda lingle governor of hawaii state of hawaii department of land and natural resources commission on water resource management p.o.box621

STATE OF HAWAII

MEMO D\~ARTMENT OF LAND AND NATURAL RESOU~-ES DIVISION OF WATER AND LAND DEVELOPMENT

P.O. BOX 373 HONOLULU, HAWAII 96809 --------------------------------------~----

TO

FROM \1\. OW'(~ EE Mte{ '?J\ , \q"\o

su_l!j_:_c~ hO V\l)(t-l ~\ ¥--... \ ~ \ J\-l\-;<{, rQ \ , ~(l;~~\\ ---------+ \tlt,\..L- LDtl~Hib

MESSAGE: '\ 4\ ~· f \ \..0 "( l\--o ~ D~ u\t\"{ ~_\qC\o -t,\..a-1( ttat-.i \-U ~e.u.., LOa<1 \~b vi~

<?~~~£o oli ---t~ Cb.l.~~-'\ ~~u....~1~ _vo\..J,.ll~ l~b --vA-it\-- \IJ~ ~A-1\\:ee.to.

~ M e~Cc'e;io f.....~-~-tt~e_((.. _ ~~u ~~_l'-:\1~k'fto~A--v

'Ro-i~ '{ -1:cWJ ~ c. ~ :i . ) a.. ~ \ ~ 0 L,. (p{\ ' U\~\; I

----~~-'----.:.. "\'. + 4, . A- _ttr:Jo ~ e::. bf..... 0 u~~A-kC ______________________ _ i I I

'Ui\A __ ~ \~"11). q l~ef~~~l.l_:: __ \_:1_1_~. ·~ _ ofl... lOA- \.A?k l!eAn (~\., ~ \1 ff~

-------~---.---------------

---\ rrtro., 1k:f1 ~ 7 ' <t ~o . q l?Jew ~ ~ .1' . -------------

Gl¥1 .. ,\. ~ e e.... \..a b .

------ ---------~---- - -------------

Page 112: application~ i~· ,~:,~P~'~------€¦ · linda lingle governor of hawaii state of hawaii department of land and natural resources commission on water resource management p.o.box621

)

KeohO .. ''·

KALA£

--c;;>. ISLAND OF HAWAII

. . . . .. KAI.l _,.'"'-I

1 ,, ...__

Page 113: application~ i~· ,~:,~P~'~------€¦ · linda lingle governor of hawaii state of hawaii department of land and natural resources commission on water resource management p.o.box621

KALA[

~ ISLAND OF HAWAII . . . . ..

IC:AI.( Y1 MU.f.:

Page 114: application~ i~· ,~:,~P~'~------€¦ · linda lingle governor of hawaii state of hawaii department of land and natural resources commission on water resource management p.o.box621

G. Matsumoto G. Akita L. Chang

__ Y. Shiroma

__ E. Sakoda __ D. Nakano __ W. Rozeboom __ S. Samuels __ E. Hirano __ T. Kam __ A.Monden __ H. Young __ D. Lee __ G. Miyashiro

Rev. 1/90 MSTON OF WATER RESOURCE MANAGEMENT

DATE: cf!LFILEIN: ____ _ PLEASE:

_ __ S. Kokubun ___ L.Nanbu ___ F. Ching ___ L. Choo

---------

REMARKS:

Page 115: application~ i~· ,~:,~P~'~------€¦ · linda lingle governor of hawaii state of hawaii department of land and natural resources commission on water resource management p.o.box621

,.....,..._ ..,. N -A N~; S A Y r(c: c· '\fEu

April 10, 1990

Mr. Wi 11 iam W. Paty Chairperson

H A-- W lr\ t. I , I N C • ' i : \ i ,-. ; . ---. I or- .•. ! ._ .... ,. . , -· , ;:.; u r; n~- . "" -, u

:..... '"' • • ~ ' ~ <._j,;

Commission on Water Resource Management DEPARTMENT OF LAND AND NATURAL RESOURCES STATE OF HAWAII P. 0. Box 621 Honolulu, Hawaii 96809

RE: KOHANAIKI WELL 1 WELL N0.-7t1~

'-\L\:tS'b-01 Dear Mr. Paty:

We have completed the grading of our well site and have mobilized our we 11 dri 11 i ng equipment to the site. Dri 11 i ng is schedu 1 ed to begin Apri 1 16, 1990 and end no later than August 13, 1990. We will submit all required information within thirty (30) days of completion of the well.

If you have any question concerning the above, please do not hesitate to contact me.

Very truly yours,

~t~ Construction Manager

RF/lo

cc: Dan Lum/ Water Resources Associates Frank Sanpei/M & E Pacific

BIG ISLAND OFf-ICE Kamuela Business Center PO Box lll222. Suite 727 Kamuela. Hawaii 96743-0020

Fox

HONOLULU Of-FICe Stongenwold Building 119 Merchont Street, Suite 500 Honolulu. Hovvoii 96813 Fox

Page 116: application~ i~· ,~:,~P~'~------€¦ · linda lingle governor of hawaii state of hawaii department of land and natural resources commission on water resource management p.o.box621

JOHN WAIHEE

GOVERNOR OF HAWAII WilliAM W. PATY

CHAIRPERSON

JOHN C. LEWIN, M.D. MICHAEl J. CHUN, Ph.D.

STATE OF HAWAII DEPARTMENT OF LAND AND NATURAL RESOURCES

COMMISSION ON WATER RESOURCE MANAGEMENT

ROBERT S. NAKATA RICHARD H. COX, P.E.

GUY K. FUJIMURA

P. 0. BOX 621 MANABU TAGOMORI, P.E.

TO: Nansay Hawaii

HONOlUlU, HAWAII 96809

"WELL CONSTRUCTION PERMIT

for

Kohanaiki Well 1 Well No. 4459 gg t./Cf'!J& -o/

Kau, North Kona, Hawaii

1112 Kinau Street, Penthouse Honolulu, Hawaii 96814

In accordance with the Department of Land and Natural Resources Administrative Rules, Section 13-168, entitled "Water Use, Wells, and Stream Diversion Works", your application to construct and test Well No. 4459-02 within Tax Map Key: 7-2-5:1 for municipal use is approved, subject to the following conditions:

1. The Division of Water and Land Development (DOWAJJD), Geology-Hydrology Section, shall be notified at 548-7 619, before any work covered by this permit commences.

2. The permit shall be for construction and testing only. No permanent pump may be installed and no water used from the well without the necessary pump installation permit from the Commission.

3. The following shall be submitted to DOWALD within 30 days after completion of the well:

a. Well Completion Report.

b. Elevation (referenced to mean sea level) survey by a Hawaii-licensed surveyor.

c. As-built sectional drawing of the well.

d. Plot plan and map showing the exact location of the well.

e. Complete pumping test record; including time, pumping rate, draw down, chloride content, and water quality data.

DEPUTY

Page 117: application~ i~· ,~:,~P~'~------€¦ · linda lingle governor of hawaii state of hawaii department of land and natural resources commission on water resource management p.o.box621

WELL CONSTRUCTION WELL Well No. 4459-02 Page 2

4. The applicant shall comply with all applicable laws, rules, and ordinances.

5. This permit may be revoked if work is not started within six months of date of issuance or if work is suspended or abandoned for six months. The work shall be completed within two years of the date of issuance.

SEP 2 7 1989

Date of Issuance

cc: USGS Department of Health,

Drinking Water Program Ground Water Protection Program

Hawaii Department of Water Supply

__ .....

Page 118: application~ i~· ,~:,~P~'~------€¦ · linda lingle governor of hawaii state of hawaii department of land and natural resources commission on water resource management p.o.box621

-

-

PROSPECTIVE WELL SITES

BETWEEN PALANI JUNCTION AND I"..AHALUU

- for

Kohanaiki Project :.1 ',: .. ,- ,:;, 1

North Kona, Hawaii

-Prepared for - Nansay Hawaii, Inc.

Kamuela, Hawaii

.... By

"'" WRter Resource Associates

---

Page 119: application~ i~· ,~:,~P~'~------€¦ · linda lingle governor of hawaii state of hawaii department of land and natural resources commission on water resource management p.o.box621

-

PROSPECTIVE WELL SITES

BETWEEN PALANI JUNCTION AND KAHALUU

for

Kohanaiki Project North Kona, Hawaii

Prepared for

Nansay Hawaii, Inc. Kamuela, Hawaii

By

Water Resource Associates Honolulu, Hawaii

June 1990

Page 120: application~ i~· ,~:,~P~'~------€¦ · linda lingle governor of hawaii state of hawaii department of land and natural resources commission on water resource management p.o.box621

CONTENTS

Purpose and Scope 1

Geologic and Hydrologic $etting . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1

Existing Ground Water Development 2

Occurrence of Fresh Ground Water 3

Water Budget . . . . . . .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . 4

Estimate of Recharge by Darcy's Law 4

Sustainable Yield 5

Well Spacing 6

Potable Water Requirement . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6

Prospective Well Sites . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7

TABLE

Table 1. Well Record

FIGURES

Figure 1. Existing Wells & Water System Figure 2. Hydrology & Sustainable Yield Figure 3. Groundwater Development & Prospective Well Sites Figure 4. Monthly Pumpage and Chlorides, Kahaluu Shaft and Wells A,B,C,D Figure 5. Potable Water Requirement

3

Page 121: application~ i~· ,~:,~P~'~------€¦ · linda lingle governor of hawaii state of hawaii department of land and natural resources commission on water resource management p.o.box621

PROSPECTIVE WELL SITES BETWEEN PALANI JUNCTION AND KAHALUU

for Kohanaiki Project

North Kona, Hawaii

Purpose and Scope

Nansay Hawaii plans to develop a coastal resort at Kohanaiki, North Kona, Hawaii, between Honokohau Harbor and the Keahole Airport. Because there are no potable water resources in the area, Nansay Hawaii must look elsewhere to develop and provide the necessary water supply for its project. Potential sources of supply lie four to eight miles away. The nearest existing sources are the County's Holualoa well and Kahaluu shaft/well-field located eight and ten miles, respectively, to the southeast. Eight to twenty-inch diameter pipelines transport water from these sources to Keahole Airport and Kalaoa.

The County Department of Water Supply probably will continue to develop new sources and expand its water system to meet the growing demand in the rapidly developing coastal and mauka areas. Because of this, a practical alternative for Nansay Hawaii to meet its water needs at Kohanaiki would be to develop additional well sources in cooperation with the Department of Water Supply. The selection of additional well sources must be consistent with hydrologic criteria, such as sustainable yield, pump capacity, well design, and well spacing.

Geologic and Hydrologic Setting

Highly permeable lava flows underlie the North Kona area between Palani Junction and Kahaluu and form the fresh water aquifer that occurs one to two miles inland from the coast. The surface geology of the area reveals no volcanic structures such as cinder cones or dikes or any coastal caprock sediments which might affect the occurrence of ground water. Thus, fresh ground water underlies the slopes of Kona in a thin (4 to 5 ft. head) basal lens which is subject to sea water intrusion. This has been confirmed by a limited. number of wells in the area. ·

Rainfall Is the source of the fresh basal water. Its geographical distribution influences the location of the lens along the Kona coast. Rainfall occurs in a belt four to five miles wide, centered four miles inland at the 2,500 ft. elevation, and parallel to the coastline. This rain belt from Palani Junction to Kahaluu has an average annual rainfall ranging from 40 to 75 inches. Because the slopes of Kona consist of highly permeable, unweathered lava flows with little soil cover, much of the rainfall percolates

Page 122: application~ i~· ,~:,~P~'~------€¦ · linda lingle governor of hawaii state of hawaii department of land and natural resources commission on water resource management p.o.box621

deeply below the surface to become ground water in the fresh water lens at sea level. No perennial or intermittent stream exists in the area. Even during periods of heavy rain, there is no runoff to the sea.

Coincident with the rain belt, fresh ground water occurs as an elongated body that parallels the coastline. Existing wells indicate that the fresh water lens occurs a mile or more inland from the coast. Existing wells provide evidence of localized upconing of salt water and gradual inland intrusion of salt water due to pumping. A few anomalies to the general occurrence of fresh water parallel to the coastline have been

. observed and may be caused by unusual or localized occurrences of impermeable dense flows, highly permeable pahoehoe or clinkery flows, and lava tubes.

Existing Ground Water Development

Prior to 1959, water supply was provided almost entirely by rain catchment from galvanized corrugated rooftops. Two mountain springs at elevations 2,100 and 2,400 ft. at Waiaha, however, supplied the hotel in Kailua town. Groundwater exploration began in 1944 with the drilling of the Waiaha test hole to determine salinity and water level. Fourteen years later, in 1958, a full-size well was drilled and pump tested along Palani Road at elevation 800 feet by the State. The well was unsuccessful and a bit of a disappointment. It yielded very brackish water (2,800 ppm, chlorides) at a distance of two miles inland from the coast.

The State's second exploratory well was located 6,000 feet inland of Kahaluu Bay at an elevation of 833 ft. It was highly successful. The well had a chloride content of only 8 ppm and was the freshest water well on the island at that time. Known as Kahaluu well A, it was put into production in 1967 with appurtenant tanks, pipelines, etc., to serve the Kailua-Kana area. Additional wells B,C, and D were drilled by the State and turned over to the County, and by 1971 the Kahaluu well field had a pump capacity totaling 3.3 mgd.

To meet the growing demand for water in the North Kana area, the State planned and developed the Kahaluu Shaft which was placed into production in 1975. Then, in 1983, the Holualoa exploratory well at elevation 1123 ft. successfully tapped the fresh water lens and was placed into production in 1985 to help meet the growing water demand of homes to the north along Mamalahoa Highway. ·

The shaft and wells mentioned above are shown in Table 1 and Figure 1. Figure 1 also shows the system of pipelines and storage tanks that transmits water from Kahaluu and Holualoa to service areas northward to Keahole Airport and Kalaoa. The Kahaluu well-field and Holualoa well supply water northward through an 8" pipeline along Mamalahoa Highway approximately 10 miles to Kalaoa. The Kahaluu well-field also supplies water southward along Mamalahoa Highway. The Kahaluu shaft principally supplies water northward through 20, 16, and 12-inch pipelines to the lower­lying coastal areas extending to Keahole Airport. Water also is supplied southward to Keauhou through 6 and 12-inch pipelines.

-2-

Page 123: application~ i~· ,~:,~P~'~------€¦ · linda lingle governor of hawaii state of hawaii department of land and natural resources commission on water resource management p.o.box621

Table 1. Well Record

Hawaii DWS 1976 590 600 4.0 34

Hawaii DWS 1959 833 12 871 878 4.0 8

Ha\vaii DWS 1959 839 12 869 881 3.2 16

Hawaii DWS 1969 834 12 859 868 4.6 8

Hawaii DWS 1970 855 14 900 905 4.0 8

State DLNR 1958 800 12 835 853 1.6 2800

Hawaii DWS 1944 595 6 539 615 3.3 440

Occurrence of Fresh Ground Water

Beneath the steep basaltic slopes of North Kona lies a thin (150 to 200 ft. thick) lens of fresh ground water that is recharged and sustained by rainfall on the slopes principally above 2,000 ft. elevation. Presumably, the lens is more or less continuous along the coast, mirroring the rain belt. Floating upon salt water, the lens' condition is dynamic as fresh water moves seaward under a slight hydraulic gradient, mixes with the underlying salt water principally due to tidal fluctuations, and ultimately discharges as brackish water near the shoreline. ·

Figure 2 shows the approximate boundary between the fresh water and brackish water portions of the basal lens from Palani Junction to Kahaluu. This interpretive boundary is based upon a limited number of wells and should be used cautiously. At Kahaluu, fresh water occurs only a mile inland from the shoreline. Along the entire Kona coast, it is the closest such distance known to occur along the entire Kona coast. It was fortuitously diSCC?vered 31 years ago, in 1959.

North of Kahaluu, the boundary between fresh and brackish water gradually shifts inland until it occurs two miles inland from shore, five miles north of Kahaluu at Kailua. Less ground water recharge andjor more permeable lavas may account for the increased inland intrusion of sea water . These two factors tend to lower the hydraulic gradient of a basal lens and, in fact, the hydraulic gradient of the basal lens does decrease northward of Kahaluu. Well records show a seaward water table gradient of -4.0 ft./mile at Kahaluu, -3.3 ft./mile at Holualoa, -2.4 ft./mile at Waiaha Well #12, and-0.7 ft./mile at the Palani exploratory well.

-3-

Page 124: application~ i~· ,~:,~P~'~------€¦ · linda lingle governor of hawaii state of hawaii department of land and natural resources commission on water resource management p.o.box621

Water Budget

One of the methods used to determine the availability of ground water in an area is to compute its water· budget, based upon proper assumptions of geology and hydrology. The objective. of a water budget is to estimate the amount of recharge (from rainfall) to an aquifer or ground water body. The water budget method is especially useful In areas where little or no well data is available and when long-term averages of rainfall, etc, are used to indicate long-term average (i.e., sustainable) conditions of an aquifer or ground water body. The water budget method is not used to account for periods of drought.

The sustaining source of recharge to the basal ground water lens is the mauka rain belt, described earlier. For the water budget calculation, it is conservatively assumed that recharge originates between the 50-inch makai isdhyet (annual rainfall contour) and the 40-inch mauka isohyet. It is also reasonably assumed that the four­mile wide rain belt creates a lens of fresh water extending parallel to the coast with ground water flow more or less perpendicular to the coastline. For purposes of selecting well sites and determining well spacing and well capacity, the recharge area between Palani Junction and Kahaluu is divided into one-mile-wide sectors. For each sector, the average rainfall (expressed in million gallons per day) has been computed and is shown in Figure 2. Approximately 15 to 17 mgd of rain falls, on average, on each coastal mile-wide sector. In the area between Palani Junction and Kahaluu, total rainfall in the rain belt averages 125 mgd.

The amount of rainfall that percolates deeply and becomes recharge (ground water flow) to the basal lens is determined by subtracting losses due to evapotranspiration and runoff. Runoff is nil. However, evapotranspiration cannot be accurately calculated without reliable evaporation data for the Kona upland area. Therefore, computation of recharge by the water budget method was not made. Studies done elsewhere, however, show calculations of recharge as a percentage of total rainfall ranging from 25% in southeast Oahu to 44% in the Pearl Harbor area. Because there is no runoff, the recharge in the Kona area probably amounts to 50% or more of total rainfall.

Estimate of Recharge by Darcy's Law

As a check on the magnitude of recharge per coastal mile, Darcy's law is used as follows:

where,

Q = KA dh/dl

Q = ground flow or recharge in mgdfcoastal mile K = hydraulic conductivity in feetfday A = cross sectional area through which recharge occurs dh/dl = water gradient in feetjmile

-4-

Page 125: application~ i~· ,~:,~P~'~------€¦ · linda lingle governor of hawaii state of hawaii department of land and natural resources commission on water resource management p.o.box621

For the study area, K is assumed to range between 1500 to 2000 feetjday. The hydraulic conductivity of Koolau lava flows on Oahu has been calculated to range from 1000 to 1500 feet; day. The lava flows In the Kana area are geologically younger than the Koolau lavas and it is reasonable to assume a similar or higher hydraulic conductivity for Hualalai lava flows.

Asssuming K = 1500 feetjday, A = (5280 ft.)(41)(4.0 ft.), and dh/dl = 4.0 ft./mile; the ground water flow, flux, or recharge per coastal mile at Kahaluu is:

a = (1500)(5280)(164)(4/5280)(7.48) = 7.4 mgdfcoastal mile

Assuming K = 2000 feet; day, and the same terms above, the ground water flow, flux, or recharge per coastal mile at Kahaluu is:

a = (2000)(5280)(164)(4/5280)(7.48) = 9.8 mgdjcoastal mile

Thus, the ground water recharge for the coastal mile sector at Kahaluu is estimated to range, roughly, between 7 and 10 mgd (45 and 65%) of total rainfall in the rain belt. The 7 mgd figure probably is conservative. Rainfall mauka of the computed rain belt undoubtedly contributes additional recharge to the basal lens, but was not included in the calculations. The calculations of recharge by the water budget method and Darcy's law are intended to show approximate, rather than precise values for recharge.

Sustainable Yield

Sustainable yield is herein referred to as the amount of ground water that can be developed from the basal lens without adversely affecting the long-term ability of the lens to produce acceptable quality water from existing and new sources. Adverse effect may relate to localized upconing of salt water caused by excessive pumping rates; or to shrinking of the lens caused by excessive total pumpage from an area or hydrologic sector. Sustainable yield is always less than recharge.

For ground water management purposes, estimation of sustainable yield in mgdjcoastallength is very useful in planning the spacing of wells and well-fields along the Kana coast.

Fortunately, records of the Kahaluu shaft and well-field, taken as a point source of ground water withdrawal, provide a good estimate of sustainable yield and an insight to the behavior of the basal lens under pumping conditions. Making a reasonable and conservative assumption that the Kahaluu "point source" is laterally capturing the mauka-to-makai ground water flow a half mile to either side of it, the sustainable yield of the Kahaluu coastal mile sector is estimated to be about 5.5 mgd. This amount equals 35% of the conservatively computed total rainfall and 55% of the estimated recharge.

-5-

Page 126: application~ i~· ,~:,~P~'~------€¦ · linda lingle governor of hawaii state of hawaii department of land and natural resources commission on water resource management p.o.box621

....

Rounding values toward the conservative side, the estimated sustainable yield per coastal mile, based upon the Kahaluu sector, is approximately 5 mgdjcoastal mile or 1 mgdjcoastal1000 feet between Kailua and Kahaluu as shown in Figure 2.

Figure 4 shows monthly pumpage of the Kahaluu shaft and well-field (Wells A,B,C,D), and monthly chlorides (an average of two to four irregular readings taken each month) of the shaft. Between mid-1982 and mid-1985, the shaft and well-field (principally Well D) pumpages were fairly constant at about 4.5 and 1 mgd, respectively. The chlorides at the shaft were fairly stable at about 125 parts per million and those at Well D (not shown) were fairly stable at about 40 parts per million. Thus, based upon the mid-1982 to mid-1985 data, the estimated sustainable yield of the Kahaluu one-mile sector Is 5.5 mgd.

However, from mid-1985 to mid-1988, as can be seen in Figure 4, the shaft pumpage rose gradually to between 5.5 and 6.5 mgd and the well-field to about 1.5 mgd (about 7 to 8.5 mgd, total). The shaft chlorides became unstable, rising steadily to 200 parts per million, while the well-field (not shown) rose to between 40 and 90 parts per million. After mid-1988 shaft pumpage was gradually reduced to 4.5 mgd by early 1990 and the well-field pumpage was increased to 3.5 mgd {8 mgd, total). At 4.5 mgd, the shaft chlorides have adjusted downward toward 200 parts per million, from a high of 250. However, the Increased pumpage at the well-field has caused chlorides to rise In the two southernmost wells: from 90 to 170 ppm in Well B and from 80 to 100 ppm in Well D. The current total pumpage of 8 mgd, as adjusted, may or may not prove sustainable.

Well Spacing

The Kahaluu well-field consists of four wells. They are aligned in a north-south direction, roughly parallel to the coastline. From north-to-south they are spaced 145 feet, 370 feet, and 225 feet apart. The two northern-most wells, spaced 145 feet apart, have a 700 gpm and a 1000 gpm pump and produced 20 to 60 ppm water in 1987-88. During this same period, the two southernmost wells, spaced 225 feet apart, produced 50 to 90 ppm water. The spacing between these two pairs of wells is 370 feet, yet they produce water with different salinities. This difference suggests that conditions of the basal lens are not always predictable and that wells 300 to 400 feet apart may show no apparent interference.

Potable Water Requirement

The potable water requirement for the Kohanaiki resort project is shown in Figure 5. A total of 2.279 mgd will be needed by 1998 with the first large increment (1.119 mgd) needed in 1993. Not shown in the 1991-1998 schedule is an additional 0.5 mgd for a marina, tennis, and ARTI.

-6-

Page 127: application~ i~· ,~:,~P~'~------€¦ · linda lingle governor of hawaii state of hawaii department of land and natural resources commission on water resource management p.o.box621

Prospective Well Sites

Planning of prospective well sites was based upon hydrological considerations of the occurrence of the fresh water lens and the estimated sustainable yield per coastal mile. Planning was also based upon the Department of Water Supply's current and future source development plans in the study area.

Figure 3 shows the Department's existing, under construction, and future well sources. By coincidence, the interpreted boundary between the fresh and brackish water parts of the basal lens lies 2000 to 3000 feet makai of Mamalahoa Highway. Therefore, all prospective well sites have been located along Mamalahoa Highway.

Spacing of the well sites was integrated with the Department's existing, under construction, and future well sites. All well sites are more or less evenly spaced 3500 to 4000 feet apart. Between the Kahaluu sector and Palani Junction, the estimated sustainable yield is 35 mgd. Therefore, with 11 sites altogether, each site has the potential to produce 3 mgd, possibly less toward Palani Junction.

Recognizing that much more has yet to be learned about the basal lens and barring any unexpected conditions, chances appear good that each of the sites (as pumping centers of one to three wells) will be able to produce anywhere from 1.5 to 2 million gallons per day from two or three wells spaced a minimum of 1 00 feet apart with pump capacities of 500 to 700 gpm each. The optimistic figure is 3 mgd per site and the optimistic pumping rate is 700 to 1 000 gpm per well, but such optimism should be constrained until proven.'by pumping test results and longer-term pumpage records.

As each well site. is drilled and tested, the results should be carefully reviewed for any recommended changes to interpretations or estimates pres~nted In this report.

-7-

Page 128: application~ i~· ,~:,~P~'~------€¦ · linda lingle governor of hawaii state of hawaii department of land and natural resources commission on water resource management p.o.box621

,,, .. r! '

EA~ jo ~.

? ··•o .· .. :

:.~ i: ~.!; · .. ·,

f\)

,.o )

> -11

~~f\)

-1 c )

f)

>U~ ,.

' m

(X)

•ern ~ ~ ('".)("') c;') ~ Q Q

~ -== Q Cl Cl C!~~ -~~ ~ " =--= -:;::p

~ -

trj" >< .......

=r.n c~ = z ~C)

~~ ·:tiE~ ~ = ~ 1 \C= \C-.. <~~!!"! 1-£ 0 ~ < .

c> ~t;j =~ ~r.n ~~ == r.n

~ ---------·•M'

Page 129: application~ i~· ,~:,~P~'~------€¦ · linda lingle governor of hawaii state of hawaii department of land and natural resources commission on water resource management p.o.box621

' -.OS cOastal lnflarcd Anomaly l

! !

8

LEGEND: :i'

~ Fresh=d·~ter laf Braddsb Ground Water - - One-MUe Sector Une 155 A~~aD (mgd) ...,._ GroUnd Water Flow 5.0 Susta~ble Yield (mgd)

~·. -,~.

Figure 2.'

.HYDROLOGY & SUSTAINABLE YIELD Honokohau-Kahaluu, Kona, Hawaii

Page 130: application~ i~· ,~:,~P~'~------€¦ · linda lingle governor of hawaii state of hawaii department of land and natural resources commission on water resource management p.o.box621

"1 I . . ;:, / a <:· .... 2 0 2 4 6

LEGEND:

County Shaft

County Well

County Well Site- Under Construction

County Well Site - Future

Prospective Well Site

8

Kahaluu Bay

Figure 3.

GROUNDWATER DEVELOPMENT & PROSPECTIVE WELL SITES Honokohau-Kahaluu, Kona, Hawaii

Mav 1990

Page 131: application~ i~· ,~:,~P~'~------€¦ · linda lingle governor of hawaii state of hawaii department of land and natural resources commission on water resource management p.o.box621

Figure 4. Monthly Pumpage and Chlorides Kahaluu Shaft and Wells A,B,C,D

North Kona, Hawaii

Million Gallons Per Day Parts Per Million 16 ~----~------~----~------~------------------~------------~--------~ 300

15 -!----+- --··---l------··-··---·--·-~----r------.. t---i

. 1 4 -- - -.. L.--~-----1 -~----1 ---···-·--···--......l...-. --··--·--··-···-····+--··········-··----·---•·-------''----!

1 3 -+----+-------··----L ... ---·----_l_ _______ l _____________ ._ _____________ L _________ _l ___ --:--+----+-rr

1 2 _, ____ j_ ___ ·--···· __ _!_________.----;..-_ ·-··----------- ·-·--·-·--+--

11

1 0 -1-------+---

9 ·-----·--··---····-···-·····

8

7

6

5 -1---r-

4

3

2 -1---Jf-----;--

1 -'!' ---"'--------"----"'

j _______ _L ____ _l __________ Sll.af..LChJ.oiJ_d_es _j. ___ _

. ________ _1 __ ····---~-------·-···-··-·-L---·----+-

250

200

150

100

50

0 ~llll~~~llll~4U~llll~llll~llll~llll~U¥~llll~~~~~~~~~~~~~~~~ 0

1980 1981

Water Resource Associates Kahaluu2.Cht

1982 1983 1984 1985 1986 1987 1988 1989 1990

Page 132: application~ i~· ,~:,~P~'~------€¦ · linda lingle governor of hawaii state of hawaii department of land and natural resources commission on water resource management p.o.box621

Figure 5. Potable Water Requirement Kohanaiki Project

North Kona, Hawaii

Mgd 1.400

1.200

1.000

0.800

0.600

0.400

0.200 0.000

1992 1993 1994 1995 1996 1997 1998

Year

i)<'llncremental

Mgd 3.000~---------------------------------------------,

2.500 4 .......................................................... .

2.000 + .................................................................................................................................................... -........... .

1. 50 0 -1 ................................................................................. ,

1.000 4 ......................................... ..

1991 1992 1993 1994 1995 1996 1997 1998

Water Rtaourot Aeaoolatea MM8tll I.OU

Year

- Cumulative

Page 133: application~ i~· ,~:,~P~'~------€¦ · linda lingle governor of hawaii state of hawaii department of land and natural resources commission on water resource management p.o.box621

-

JOHN WAIHEE

GOVERNOR OF HAWAII

STATE OF HAWAII DEPARTMENT OF LAND AND NATURAL RESOURCES

COMMISSION ON WATER RESOURCE MANAGEMENT

TO: Nansay Hawaii

P. 0. BOX 621

HONOLULU, HAWAII 96809

WELL CONSTRUCTION PERMIT

for

Kohanaiki Well 2 Well No. -4+&9 OS 4-4-<?~ ...0'1-

Kau, North Kona, Hawaii

1112 Kinau Street, Penthouse Honolulu, Hawaii 96814

WILLIAM W. PATY

CHAIRP£RSON

JOHN C. LEWIN, M.D. MICHAEL J. CHUN, Ph.D.

ROBERT S. NAKATA RICHARD H. COX, P.E.

GUY K. FUJIMURA

MANABU TAGOMORI, P.E. DEPUTY

In accordance with the Department of Land and Natural Resources Administrative Rules, Section 13-168, entitled "Water Use, Wells, and Stream Diversion Works", your application to construct and test Well No. 4459-03 within Tax Map Key: 7-2-5:1 for municipal use is approved, subject to the following conditions:

1. The Division of Water and Land Development (DOWALD), Geology-Hydrology Section, shall be notified at before any work covered by this permit commences.

2. The permit shall be for construction and testing only. No permanent pump may be installed and no water used from the well without the necessary pump installation permit from the Commission.

3. The following shall be submitted to DOWALD within 30 days after completion of th~ well:

a. Well Completion Report.

b. Elevation (referenced to mean sea level) survey by a Hawaii-licensed surveyor.

c. As-built sectional drawing of the well.

d. Plot plan and map showing the exact location of the well.

e. Complete pumping test record; including time, pumping rate, draw down, chloride content, and water quality data.

Page 134: application~ i~· ,~:,~P~'~------€¦ · linda lingle governor of hawaii state of hawaii department of land and natural resources commission on water resource management p.o.box621

WELL CONSTRUCTION PERMIT Well No. 4459-03 Page 2

4. The applicant shall comply with all applicable laws, rules, and ordinances.

5. This permit may be revoked if work is not started within six months of date of issuance or if work is suspended or abandoned for six months. The work shall be completed within two years of the date of issuance.

SEP 2 7 1989

Date of Issuance

cc: USGS Department of Health,

Drinking Water Program Ground Water Protection Program

Hawaii Department of Water Supply

erson urce Management

Page 135: application~ i~· ,~:,~P~'~------€¦ · linda lingle governor of hawaii state of hawaii department of land and natural resources commission on water resource management p.o.box621

DEPARTMENT OF WATER SUPPLY • COUNTY OF HAWAII 25 Ai9et.lffiPst3EE~ s :H2._b, HAWAII 96720

T E L E P H 0 N E (808) 9 6 9 - 1 4 2 1 • F A X (808) 9 6 9 - 6 9 9 6

September 8, 1989

Mr. Manabu Tagomori, Deputy Director State Department of Land and Natural Resources Commission on Water Resource Management P.O. Box 621 Honolulu, HI 96809

WELL CONSTRUCTION PERMIT APPLICATION KOHANAIKI WELLS 1 AND 2

The developer for the Kohanaiki Development is required to provide for water source development to fulfill the water demand requirements.

We have no objections to the subject permit application.

H~a~ Manager

GK

. . . Water tring~ progre~~ ...

\

Page 136: application~ i~· ,~:,~P~'~------€¦ · linda lingle governor of hawaii state of hawaii department of land and natural resources commission on water resource management p.o.box621

JOHN WAIHEE

GOVERNOR OF HAWAU

!

l. ii , I 1 ', ~· I ,: < ; ;

STATE OF HAWAII DEPARTMENT OF HEALTH

P. 0. BOX 3378

HONOLULU, HAWAII 96801

August 31, 1989

JOHN C. LEWIN, M.D.

DIRECTOR OF HEALTH

18 I',>.) 7

In reply, please refer to: EPHSD

The Honorable William W. Paty, Chairperson Commission on Water Resource Management Department of Land and Natural Resources State of Hawaii P.O. Box 621 \ Honolulu, Hawaii 96809

Dear Mr Paty:

SUBJECT: WELL CONSTRUCTION PERMIT KOHANAIKI WELLS 1 and 2 STATE WELL NOs. 4459•&2 and 4439 Q3 KAILUA, HAWAII .q,~ · •. :.;~. -::. _; . ·l :

Thank you for the opportunity to comment on the well construction permits for the Kohanaiki Wells 1 and 2. We offer the following comments:

1. The permits state that the wells are intended for municipal (including hotels, stores, etc) use. If the wells will be serving a public water system, you will be required to comply with the Department's Administrative Rules, Title 11, Chapter 20, "Potable Water Systems". A public water system is defined as a system serving 25 or more individuals at least 60 days per year or which has a minimum of 15 service connections.

2. Section 11-20-29 of Chapter 20 requires that a new source of potable water serving public water systems be approved by the Director of Health prior to its use. Such approval is based primarily upon the submission of a satisfactory engineering report which addresses the requirements set in Section 11-20-29.

3. The proposed wells lie above the UIC line. Land areas above the UIC line are considered to contain underground sources of drinking water. Thus, it is essential that the proposed well be designed and constructed to prevent the possibility of groundwater contamination. For example, the well should have a concrete well pad and full grouting to prevent seepage or floodwaters from migrating down the well shaft.

Page 137: application~ i~· ,~:,~P~'~------€¦ · linda lingle governor of hawaii state of hawaii department of land and natural resources commission on water resource management p.o.box621

The Honorable William W. Paty Page 2 August 31, 1989

If you should have any questions, please contact the Safe Drinking Water Branch at

cc: Philip Ho Nansay Hawaii 1112 Kinau St., Honolulu, Hawaii

Penthouse 96814

Very truly yours,

JOHN C. LEWIN, M.D. Director of Health

Page 138: application~ i~· ,~:,~P~'~------€¦ · linda lingle governor of hawaii state of hawaii department of land and natural resources commission on water resource management p.o.box621

Septerr.her P., lflBf?

J,J·ar!Sfl3:-- I::.a\'.:'tJii 1112 ~ineu Street, Penthouse 11nnolu1u, Hawaii 96814

ThE· Commissjon on Water Resourco T·'anaf:emc:m.t will h•': r.ctinr or< :,rnm' permit Rpplics~ion for Eohn.nd1d WellR J &: ~ ~t their meeti:nR or. Sept~mbe-r 13, HiSS, ot ? :GO p. rn. Pletwe note thst the r:1ectiny- will ta1<e plncf' h"~ Lihue, Kauai, gt the State Office Buildi~ r, Co:r.ferene~ I~nomR A 1mfl H, 3060 l?iws Street.

Ym..1.r npplieatio'' v.rm h0 h!cluded r;n the n;;t:mda as Itm11 1~ ( ntt~c:he(-1) •

128: br:l A :tach.

)

Page 139: application~ i~· ,~:,~P~'~------€¦ · linda lingle governor of hawaii state of hawaii department of land and natural resources commission on water resource management p.o.box621

Bernard K. Akana Mayor

HughY. Ono , , ' - - ' -' f) Chief Engineer

.... '"-·-· ""-~ \~- -~ "':..J

k Bruce C. McClure Department of Public Wor s \ DeputyChiefEngineer

25 Aupuni Street, Rm. 202 • Hilo, Hawaii 96720 • (808) 961-83Jli ·A~g (~) 9GfJl,t1)8 I I

August 29, 1989

MR MANABU TAGOMORI DEPUTY DIRECTOR DEPT OF LAND AND NATURAL RESOURCES COMMISSION ON WATER RESOURCE MANAGEMENT P 0 BOX 621 HONOLULU HI 96809

SUBJECT: WELL CONSTRUCTION PERMIT APPLICATION Kohanai ki Wells 1 & 2 ( 4459 02-;-{}3-) TMK: 7-2-5: 1 ,,,,, i :> ' .

We have reviewed the subject permit application and have no objections to the proposed well construction.

YANABU, Division Chief eering Division

STT :jj s

Page 140: application~ i~· ,~:,~P~'~------€¦ · linda lingle governor of hawaii state of hawaii department of land and natural resources commission on water resource management p.o.box621

Honorable .Toh!~ C. l,c~,dn, ;" .• U. Di.re<:'tor of i~.calt11 Depnrtment 0f I!ealth 1:::50 Punehbmd f!trt::et L'onolulu., I' av•aii !1f; 813

••••

In n~COI'(lt1Y'.ee with the nep!1rtment cf r.an.r: fl~·c1 NvturPl Fesourees J\<J~ir1ist:rntivc )Jule[!, f~-(:ctio11 13-1(18-J~(c), ,~,t~ ~-'~e €en<1i~r·· T~'rOlJ H enp:~r of the folJr~v.:1.r>f' 'l")crnit :1ppUentinn:

Plensc suhr.dt ~.'GUr cor'":ncnts to nf:, n:rrll~:~ cr in v:rith:r", ,~,ithirt thre~ l"<..,eb; f1'0r-: the: dat0 0f thh; letter.

I.f :-rc~u }l(~'ile ~).·~~- rrt:c:;tin:.nE.: ~ r~Jcn8e ~c1r-"":tr~0t

54f.-75?3.

Page 141: application~ i~· ,~:,~P~'~------€¦ · linda lingle governor of hawaii state of hawaii department of land and natural resources commission on water resource management p.o.box621

: _r. fJ,l1f:h ~;.)". f"il}C~

Chief E-nr,inecr J)epnrtmel1t of Pltl)lic r~orl~s rounty of Pn:waii ::5 A u.pn:1i Street FHo, Hrt\'udi 967~'(1

\ 'n o.re pr~n(3ir·r; '>aU 8 cop:· c•f the followir•r; permit e:ppHcf~tio~• r,.,T

;70llr J'C:'\'"ir::v~J e.r~c: c:ornr:·t~nts:

Pk~nB(~ ~uhrl'it ;rm.n· e:nr!·;ne:•ts tn n::~, c•I'Dll;? or jr; ''Tlti;' ~~, wit hi:-) thJ'C(' \.'Pck::-; fro:n the dnh·' nf this letter.

------

i •· A pA' ntJ "'/ r(···· 'f'\T~Y l f· ...... ) ,· .< ...... J l_, 1. ) . .. :: Ji' 'o.. . .P.; J

!·,er~t~t~/ !.'ii!·,e~te.r

l

Page 142: application~ i~· ,~:,~P~'~------€¦ · linda lingle governor of hawaii state of hawaii department of land and natural resources commission on water resource management p.o.box621

T·J fjJtst.1:~r J \nv,r Elii 1112 Eimnr St., P0nthouse Honolulu, r;nwo.ij 96814

ficrtlemen:

.P.ur:-ust ?1, HlB~

\?e ack"Jowled!;l"e rE'ceipt of 7N1r HpplioHtioP for well construdkr-; permits for rohnncild \iellF 1 End ? ( 4.459-0?' o:n rt Knu. tiorth r:nrn' Hawaii.

i11 y staff wiH be processi:nr; the permits e.:rc v•ill contHct ;'our Rtnfi shrmld there he ony questions.

BS: k0 cc: r:&E Pacific, Inc.

Page 143: application~ i~· ,~:,~P~'~------€¦ · linda lingle governor of hawaii state of hawaii department of land and natural resources commission on water resource management p.o.box621

'i"r !VED M&E Pacific, Inc.

Ht.C Suite 500, Pauahi Tower

1001 Bishop Street Honolulu, Hawaii 96813-3497

? 3 : (Ef>6 FAX

r.: 6: Arc.'1itects en i.tlf' 16 :.; :..; IJ •.:·.:;

August 11, 1989

Division of Water and Land Development P.O. Box 373 Honolulu, Hawaii 96809

Dear Sir:

Transmitted herewith are applications for construction permits for Kohana'iki Wells No.1 and No. 2. The wells will be consolidated for Nansay Hawaii, Inc. The drilling contractor will be chosen in the near future.

Attached are the following items as requested:

Application for Kohana'iki Well No. 1

Application for Kohana'iki Well No. 2

u.s.G.s. Kailua topographic map showing well locations

Tax Map Key 7-2-5: 1

Check for $50.00 payable to the Department of Land and Natural Resources

Thank you for your consideration.

FTS:gt

Enclosures

Page 144: application~ i~· ,~:,~P~'~------€¦ · linda lingle governor of hawaii state of hawaii department of land and natural resources commission on water resource management p.o.box621

State of Hawaii COMMISSION ON WATER RESOURCE MANAGEMENT

Department of Land and Natural Resources Division of Water Resource Management

~ WELL CONSTRUCTION PERMIT

PUMP INSTALLATION PERMIT

APPLICATION FOR

Well No. 1 of 2 Kohana•iki

INSTRUCTIQHS: Pieue print or type and aend completed appUcatton with attachment& to the otv1alon or Water and Land Development, P.O. Box 3'73, Honolulu, Hawal 91101. Application muat be accompanied by a non-refundable filing f~ of S25.00 p•yable to the Department of Land and Natural Reaourcea. <PWnc f" waived for covemment •cenciea.) tr nece .. ary. phone 5411-'7543, Hydro!o(I/OeoiO(I Section for aaaiatance. ·

1. WELL LOCATION

Island Hawaii Address

Tax Map Key--~7_-~2--5~:~1 ______ __

(Attach a USGS map (scale 1"=2000') and property tax map showing well location referenced to established property boundaries. )

2. WELL OWNER LANDOWNER

Firm Name Nan say Hawaii

Contact Person Mr. Phi 1 i p Ho

Address 1112 Kinau St., Penthouse

Honolulu, Hawaii 96814

Phone

Firm Name Nan say Hawaii

Contact Person ..;.M.;.;r_._.;..P.;.;;.h..;.i .;..1 ~i p......,;.H.;..;o;,._ _____ _

Address i112 Kinau St., Penthouse

Honolulu, Hawaii 96814

Phone

3. PROPOSED CONTRACTOR POR: !Z7Well Drilling 0Pump Installation

Name to be arranged Address ---------------------------

4. PROPOSED WORK

t!J Drill New Well 0 Deepen CJ Alter CJ Seal

Phone

Contractor' a License No.

0 Redrill C1 Abandon

-----------

C1 Install New PumP Cl Replace Pump 0 Modify Pump

(Briefly describe the proposed work and fill in the diagram ·on the back of this form. )

5. PROPOSED USB

KX7Municipal (including hotels, stores, etc.) DMilitary ODomestic (individual, noncommercial water systems) Olndustrial Oirrigation (specify) OOther (specify) ___ _

6. PROPOSED AMOUNT OP WITHDRAWAL one mi 11 ion gallons per day

7. PROPOSED PUMP INPORMA TION

Pump Type: ~Vertical Turbine 0Submersible Motor: ODiesel · 0Gas LD'Electric:

0 Centrifugal Rated Horsepower ------Rated Pump Capacity 750 gallons per minute (gpm)

• • • * * • • • • • • • • • • • • • • • • • • • • • • • • • • • • Well Owner

Far OffiaiaZ Use OnZy: FieZd Cheaked By ______ _ Date ______________________ __

Landowner

Latitude ____ _

Longitude ____ _ HydroZogia Unit -----­

State We Z Z No.-------

Page 145: application~ i~· ,~:,~P~'~------€¦ · linda lingle governor of hawaii state of hawaii department of land and natural resources commission on water resource management p.o.box621

:-- i \ k.-. '.,.,,...: ~=-· "'" -~::- r---;

: ·=- ~- ... ~

Briefly describe the proposed work: "'_· t1 .-, ~ : :"-.. t f'\ ··-· r' ~ ~

The objective is to drill, construct and test a water WeJ(by tRe ~ota:ry 1 6 method, to a total depth of 1,665 feet. The planned yield:of~he well js one

---·- ~ • ·--·~ -!.,. , "" , ~-- 1 l -Cll

million gallons per day to provide potable water for pubtft't~JpP'ly-~(it:ifp~Jes.

This is one of two wells that will provide a total of 1.6 mgd for the hotels

plus 10 percent for the use of the Hawaii County water supply.

Elevation at top of casing 1,605 ft., msl.~

Cement Grout 600 ft.

Hole Dia. 21 in.

Total Depth 1,665ft.-~

Rock Packing 990 ft.

Filter pack 55 feet

:2 ... .. ~

·'· . . . .. : . ...

I I

PROPOSED SECTION OF WELL

Ground Elev. · 1,600 ft., msl• ------~----~--------

Solid Casing: A-283 Grade B Material mild steel Length 1 600 ft. Diameter 14 in.

Wall thickness 3L8 in.

Roscoe Moss Full Flow louver Casing: I /Perforated >f.X /Screen

Material s tee 1 ~~~----------------

1 Length 50 ft .

I Diameter 14 in.

I Wall thickness 5/8 in.

Openings 80 sq. in./ L. F.

~Open Hole: ~-------Length 20 -------------------------Diameter 12 in . -------------------

*Approximate elevation' at time of filing application. Final elevation (msl) by a surveyor licensed by the State must be submitted at start of construction.

Page 146: application~ i~· ,~:,~P~'~------€¦ · linda lingle governor of hawaii state of hawaii department of land and natural resources commission on water resource management p.o.box621

State of Hawaii COMMISSION ON WATER RESOURCE MANAGEMENT

Department of Land and Natural Resources Division of Water Resource Management

APPLICATION FOR

~ WELL CONSTRUCTION PERMIT We 11 No. 2 of 2 Kohan a • i k i

PUMP INSTALLATION PERMIT

INSTRUCTIONs: PieaH print or type and Hnd completed appUcaUon with attachment& to the otvt.lon ol Water and Land Development, P.O. Box 313, Honolulu, Hawaii 9110t. Application muat be accompanied by a non-refundable filing t~ ot S25.00 payable to the Department of Land and Natural Reeoureea. <PWnc fee waived for rovemment acenctea. l If nece .. ary, phone 548·1543, Hydrolop/CieolO(I Secrton for aaatatance. ·

1. WELL LOCATION

Island Hawaii Address

Tax Map Key-----~7~-~2_-~5~:~1~--------

(Attach a USGS map (scale 1 "=2000') and property tax map showing well location referenced to established property boundaries. )

2. WELL OWNER

Firm Name Nansay Hawaii

Contact Person Mr. Philip Ho

Address 1112 Kinau St., Penthouse

Honolulu, Hawaii 96814

Phone

LANDOWNER

Firm Name Nan say Hawaii

Contact Person ..;.M.;..r_._.;..P.;.;..h..;.i .;..1 ..;.,l; p"---H.;..;o ______ _

Address 1112 Kinau St., Penthouse

Honolulu, Hawaii 96814

Phone

3. PROPOSED CONTRACTOR POR: S]Well Drilling 0Pump .Installation

Name to be arranged ---------------------~----------------------__;,------

Phone -----------Address ----------------------------

Contractor's License No.

4. PROPOSED WORK

li!J Drill New Well C1 Deepen D Redrill CJ Alter C1 Seal D Abandon 0 Install New ~p C1 Replace Pump D Modify Pump

(Briefly describe the proposed work and fill in the diagram on the back of this form.)

5. PROPOSED USE mMuniclpal (including hotels, stores, etc.) OMilitary ODomestic (individual, noncommercial water systems) Oindustrial Oirrigation (specify) OOther (specify) ___ _

6. PROPOSED AMOUNT OP WITHDRAWAL one mi 11 ion gallons per day

7. PROPOSED PUMP INFORMATION Pump Type: mvertical Turbine 0 Submersible 0 Centrifugal Motor: ODiesel · OGas al'Electric: ______ Rated Horsepower Rated Pump Capacity 750 gallons per minute (gpm)

• • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • * * *

Well Owner

For Official Use Only: Field Checked By ______ _ Latitude ____ _ Hydro logic Un.i t ------Date __________________________ _ Longitude ____ _ State Well No. ______ _

Page 147: application~ i~· ,~:,~P~'~------€¦ · linda lingle governor of hawaii state of hawaii department of land and natural resources commission on water resource management p.o.box621

t ~ .

Briefly describe the proposed work: ~~ ~ :. ~; :~~ 16 .-· J ~ j 6

The objective is to drill. construct and test a water well by the rotary

method, to a total depth of 1,665 feet. The planned yield of the,welh:ifKOne

million gallons per day to provide potable water for publicLiuiffp);{pbr;p8'§~,~~ This is one of two wells that will provide a total of 1.6 mgd for the hotels

plus 10 percent for the use of the Hawaii County water supply.

Elevation 1,605

~ ... .. .. Cement ~ Grout 600 ft. __ ...,_....,.._._.

Hole Dia. 21 in.--~ ..... .,

Total Depth 1,665 ft. ---•

Rock Packing 990 ft.

Filter pack 55 feet

I I

PROPOSED SECTION OF WELL

Ground Elev. - 1 , 600 ft., msl*

Solid Casing: A-283 Grade B Material mild steel Length _..,:1..z..:;.;60;..::0:;__ ______ ft.

Diameter _.::..14.:,_ ________ in.

Wall thickness ....:::.!3/~8;__ ____ in.

Roscoe Moss Full Flow louver Casing: I /Perforated '/.X /Screen

Material --=s~t.::.e.::.e 1~--------1 Length 50 ft .

I Diameter 14 in.

I Wall thickness 5/8 in.

Openings 8:::.:;0:.._____ sq. in./ L. F.

~Open Hole:

Length 20 -------------Diameter __ 1:.:2:;__ ______ in.

*Approximate elevation' at time of filing application. Final elevation (msl) by a surveyor licensed by the State must be submitted at start of construction.

·.·,.!

Page 148: application~ i~· ,~:,~P~'~------€¦ · linda lingle governor of hawaii state of hawaii department of land and natural resources commission on water resource management p.o.box621

\ (

KALA£

ISLAND OF HAWAII ~ . . . . .. ~leN IItLE

l~--------------------~

Page 149: application~ i~· ,~:,~P~'~------€¦ · linda lingle governor of hawaii state of hawaii department of land and natural resources commission on water resource management p.o.box621

1

.. • 0 .. ~

,, .

--------J=~ .. ~.~~~.------A

0

/.-•

---··­.. 0

Jll Tax Map Key: 7-2-5: 1 Showing location of Kohana•iki Well

Page 150: application~ i~· ,~:,~P~'~------€¦ · linda lingle governor of hawaii state of hawaii department of land and natural resources commission on water resource management p.o.box621

Tax Map Nansay Hawaii Wells No. 1 and 2

91 . (' :r t d .1"':.~

- '!

u .;

Page 151: application~ i~· ,~:,~P~'~------€¦ · linda lingle governor of hawaii state of hawaii department of land and natural resources commission on water resource management p.o.box621

PAY TO THE ORDER OF

<fA~~ M&E ~cifiq Inc

59 CHECK NO. 0 0 2 2 9 8

~ti!t,~ soo •. Pa~ahi T:()w~ •lQql Bis~p ?'· • • Honoltilu, Haw~;~.n 9(l$13

FIRST HAWAIIAN BANK HONOLULU, HAWAII

( ·••••••••••·•··. > . ···.··. ·····••·••·•· .· \ ( ..•.••.

DEPI'. OF~.&~~

0 ~ 111 0 2 S 0 g 0 u•

Page 152: application~ i~· ,~:,~P~'~------€¦ · linda lingle governor of hawaii state of hawaii department of land and natural resources commission on water resource management p.o.box621

:,,.--' July 27, 1989

MEMORANDUM FOR THE RECORD

FROM: Gordon Akita

SUBJECT: Water Source Development for Kohanaiki, North Kona, Hawaii .

A meeting was held on the subject above on July 13, 1989 in the Division of Water and Land Development's conference room. The purpose of this meeting was to discuss the State and Kohanaiki Water Sources Development Plans.

Persons in attendance:

Ed Harada, M & E Pacific Frank Sanpei, M & E Pacific Joe Callahan, M & E Pacific

Discussion:

Dan Lum, DOWALD Gordon Akita, DOWALD

1. Attached map shows the Kohanaiki Hotel development location, the additional parcel (TMK 7-2-5: 1) location, proposed well field location, and proposed transmission line (2 alternatives) shown in red.

2. The Kohanaiki Hotel development is owned by Nansay and will require approximately 2. 5 MGD.

3. Wastewater will be reused for irrigation water for the golf course.

4. Nansay also acquired TMK: 7-2-5:1 for additional development and well field.

5. The hotel is scheduled to open in early 1993.

6. Developer proposes to use wells to provide total hotel water needs plus 10% to DWS. DWS has agreed to operate and maintain offsite water system.

7. Info on North Kona (Kalaoa) Exploratory Well were provided as follows:

• Anticipated NTP is August 1989 e 8-month construction period o Copy of plan and specifications

8. Funds for future Hualalai Exploratory Well in North Kona have been appropriated. Location of this well will depend on the results of the Kalaoa Well.

9. The yield of Kalaoa Well is expected to be about 300-350 gpm .

.JJ

Page 153: application~ i~· ,~:,~P~'~------€¦ · linda lingle governor of hawaii state of hawaii department of land and natural resources commission on water resource management p.o.box621

cP OKAUAI

NIIHAU

OAHU~

THE HAWAIIAN ISLANDS

'"-'

...

Keahale Paint ·

0· ('· ~

..,""

Hanakah&U Harbor

Kallu•

~L:J B~

v -4000

I eel 8000

b 1000 2000 me111r'

500

KALOKO PROPERTIES

FOR KALOKO & KOHANAIKI Kaloko. North Kona. Hawaii

Prtmared For

Prepared By

TMK

AoP..l

TSA DEVELOPMENT COMPANY, L TO.

WILSON OKAMOTO & ASSOCIATES. INC.

H•x~''"'" H.'"·"'

7-3-<10:17 7-.3-51:0 I

1,333 tAcres fi 1

Page 154: application~ i~· ,~:,~P~'~------€¦ · linda lingle governor of hawaii state of hawaii department of land and natural resources commission on water resource management p.o.box621

. .

-··-/

. .

MEDIUM-LOW DENSITY RESIDENTIAL AND GOLF COURSE

(368: acres)

· · Lot 7-B

MEDIUM-LOW DENSITY RESIDENTIAL

(575~ acres}

Lot 7- c

: Lot 7-D

7-A

BUSINESS COMMERCIAL;

(2251 acres)

UGHT INDUSTRIAL

(165:t acres)

IU l,o\fl.lf.'\ ~

. .

:

C::c•:x•::• :;::::•ooc:::':t'"::" ='::i'o!., .' 100 200 .Joo •oo

KALOKO PROPERTIES

FOR KALOKO & KOHANAIKI Kaloko. Noren Kona. Ha~~Nail

Prt!!'\).ll.d ; TSA OEVELOPtr.•ENT Fu COMPANY'. L TO .

p,-.,.,..a : WilSON OKAMOTO D1 a ASSOCIAI ES. tNC.

Tt.U(

"' ...... .-J t\.•-·

, .. 3•08 ,, l·l-!101

.:...-.. l.llJ! ... , •••

I--· , ... ' I.,........._ _IJJ \._...,_..._1*•1 I ,;~...,I t-••,• •II \'\,JJ' 1 ... \.I.,....L\.._' AI• o-l"'lll',lar-4~.;_•.t.,I..UI'.~=-·-I'tr..'\':lir.liii\\'J~_} I • "' ''\ If_'

Page 155: application~ i~· ,~:,~P~'~------€¦ · linda lingle governor of hawaii state of hawaii department of land and natural resources commission on water resource management p.o.box621

~r'')N OF WATE~· ~SOURCE MANA'--'dENT Rev. 12/88

FROM: \ f 'I' . ~ -J~- ... :~ DATE: 'i(;) ~ FILE IN: _________ _

PLZ: __ M. T AGOMORI __ See Me

TO: INITIAL:

.,// __ Take Action By __ ~ __ D. Lum Route to Your Branch

__ G. Matsumoto Review & Comment __ G. Akita __ Draft Reply __ ,_.··· __ L. Cha~ng--... __ Ackno.wJectge Receipt __ Y ._ Shfroma \ =z1.~rox __ copies

/ , f. Sakoda /,~,, .. ··· -~ ~!~1 _ __,_,_

1 D. ~?~~·-· _L_ For Information __ \....JN;'Kbzeboom __ P. Haraguchi __ S. Samuels __ R. Chung __ T. Kam __ A. Monden __ H. Young __ R. Suzuki __ N. Kaneshiro __ T. Nakama

S. Kokubun D. Hamada L. Nanbu

___ F. Ching

REMARKS:

1 I , I, \ •.

Page 156: application~ i~· ,~:,~P~'~------€¦ · linda lingle governor of hawaii state of hawaii department of land and natural resources commission on water resource management p.o.box621

M & E Pacific, Inc. Engineers & Architects

Mr. Manabu Tagomori Department of Land and Natural Resources

State of Hawaii 1151 Punchbowl street Honolulu, Hawaii 96813

July 26, 1989

Big Island Office 100 Pauahi St., Suite 212 Hilo, Hawaii 96720 Telephone

FAX: (808)

c•:-:; (.0

f"-'' '-~-:'ll· c.:: c.::: '" .... •. tf\,,., .- ! : ~: .. 0' '

t-·~ c·:·· N ,.. ...

f O::J .,

' c•.:'

l ... ~, ~,· :

1"1 ... ;" t ..... :> .. ·o ... ~- .... ,..,,~ ........

'

rr• r~·; :wJ::: ?~J fT1

""'"' z N Dear Manabu:

Re: Kohanaiki Project - North Kona __,

(.A)

Thank you for making time from your busy schedule last week to meet with Takeo Fujii, Joe Callahan and me to discuss the water system requirements for the Kohanaiki project. The information provided by you and your staff was very beneficial in giving us a clearer picture of the State's plans for water development in the North Kona area in addition to requests made by private developers to the State Water Commission.

As we indicated at the meeting, a request for drilling of exploratory/production wells for the Kohanaiki project within TMK: 7-2-5: 1 will be submitted to the Water Commission in the near future. With the data available from the Huehue Ranch Well No. 1 in addition to information from your State exploratory well in Kalaoa, we should all get a better idea as to the potential and capacity of the North Kona acquifer.

I thank you again for your assistance and ask for your continued help and guidance as we proceed with our project. Please feel free to call me should you have any questions.

mms

cc: Mr. Phillip Ho Mr. Frank Sanpei Mr. Joseph Callahan

yours,

Harada

, .... , ...........

Page 157: application~ i~· ,~:,~P~'~------€¦ · linda lingle governor of hawaii state of hawaii department of land and natural resources commission on water resource management p.o.box621

_:_::- -0

T..J'atermain to constructed wit Imp. Dist. proj •

f I

.. • 0 .. ,

' .· I

1 I I

'\.···:::· .-· I I .. . I . ··. ,, ... ,_ ... I I

·~ . f .. ... ' ~ . .. ., .... . ~.

c~-~-­<" ' .... ~~~l !~~~-~

. .... I ·I -~.

I . :--. I

, NORTH KONA

COUNTY OF HAWAII " .

Page 158: application~ i~· ,~:,~P~'~------€¦ · linda lingle governor of hawaii state of hawaii department of land and natural resources commission on water resource management p.o.box621

I I. o;·, v '

Page 159: application~ i~· ,~:,~P~'~------€¦ · linda lingle governor of hawaii state of hawaii department of land and natural resources commission on water resource management p.o.box621

Rev. 12/88

FROM:

\. (M"'ON OF WATER RESOURCE MANAr 'MENT

~...._..;) DATE:J / yi) FILE IN:--------

TO: INITIAL:

__ M. TAGOMORI

/-----,.~ D. Lum __ G. Matsumoto __ G. Akita

~ __ L. Chang __ Y. Shiroma

__ E. Sakoda __ D. Nakano __ w. Rozeboom __ P. Haraguchi __ S. Samuels __ R. Chung __ T.Kam __ A. Monden __ H. Young __ R. Suzuki __ N. Kaneshiro

,' T. ~a~~-1¥ /J1~ ) ~ . .., < / ._ __ .)

b~ , .... '

----------

PLEASE:

--""- See Me __ Take Action By __

Route to Your Branch Review & Comment

__ Draft Reply __ __ Acknowledge Receipt

/xerox __ copies _-r_·Fne ~ail _L_ For Information

S. Kokubun D. Hamada L. Nanbu

__ F. Ching

REMARKS:

Page 160: application~ i~· ,~:,~P~'~------€¦ · linda lingle governor of hawaii state of hawaii department of land and natural resources commission on water resource management p.o.box621

Big Island Office M & E Pacific, Inc. Engineers & Architects

100 Pauahi St., Suite 212 Hilo, Hawaii 96720 Telephone (808~ FAX: (808)

July 17, 1989

Mr. Dan Lum Department of Land and Natural Resources Division of Water and Land Development 1151 Punchbowl Street Honolulu, Hawaii 96813

Dear Dan:

Re: Kohanaiki Development

Thank you for making time from your busy schedule to meet with Frank Sanpei, Joe Callahan and me last week to discuss the water requirements for the Kohanaiki project in North Kona. We appreciated especially your sharing of information regarding your department's experiences and knowledge in deep well exploration in that region and your current and future plans for water source development.

As discussed with you, the water needs for our project are proposed to be provided by a series of wells in the vicinity of TMK: 7-2-5: 1 and along the Mamalahoa Highway as shown on the attached map. We propose to drill an initial exploratory/production well on TMK: 7-2-5: 1 and, consequently, look with interest at the State's proposed well to the south currently under contract with Water Resources, Inc. The results of your testing for quality and quantity together with our knowledge of the Huehue Well to the north would give use a better understanding of the acquifer in that area.

We have scheduled a meeting with Manabu Tagomori on July 20th to inform him of our plans and to discuss the requirements of the State water Commission for our proposed well development. We will continue to keep in touch with your division as we proceed with our plans for Kohanaiki.

.... I\ 0

........ '

( .......

fi• .......... ~

"' ...

Page 161: application~ i~· ,~:,~P~'~------€¦ · linda lingle governor of hawaii state of hawaii department of land and natural resources commission on water resource management p.o.box621

~

M & E Pacific, Inc. Mr. Dan Lum Page Two July 17, 1989

Thank you again for your help. Please feel free to call me should you wish to discuss this matter.

Attachment: 1

cc: Mr. Phillip Ho w;attachment Mr. Frank Sanpei wjattachment Mr. Joe Callahan wjattachment

yours,

Harada

Page 162: application~ i~· ,~:,~P~'~------€¦ · linda lingle governor of hawaii state of hawaii department of land and natural resources commission on water resource management p.o.box621

0

/ T..J"atermain to constructed wit Imp. Dist. proj.

I

f

.. ...

.. .. 0 ..

"\

I I

I I I

'• ·-~ I I

I· I t'

~·- "'!

. ..;:, . , . ·-- · ... '. t,,... .· (' 1 .... ...... _-;./

,_> . I ·. - ""· ·. I ,_ ..

-·­__ .

, NORTH KONA

COUNTY OF HAWAII

Page 163: application~ i~· ,~:,~P~'~------€¦ · linda lingle governor of hawaii state of hawaii department of land and natural resources commission on water resource management p.o.box621

Trnstee•s Views

(This column is open to all OHA Trustees as a vehicle for them to express their mana'o. Opinions expressed are those of the individual Trustees and do not necessarily represent the official position of the OHA Board of Trustees.)

By Moanikeala Akaka Trustee, Hawai'i

Wai ka ola, water is life. No water, no life.

About 10,000 people statewide had regis­tered their claims and native rights for water use by the end of May, thanks to the efforts of: Dr. Williamson·Chang, professor of water rights. at the University of Ha­wai'i law school; the

Native Hawaiian Advisory Council (which Chang heads); and the Aha Hui of Hawai'i, a group of law students. Everyone was pleasantly surprised at the flood of water use declarations that poured into the Department of Land and Natural Resources.

Chang, the Advisory Council and law students ought to be applauded. They were concerned and saw to it that small users' water rights should be protected, lest the sugar companies and large cor­porations, with lawyers to register their claims, be the real beneficiaries of this water Mahele.

In the 1840s the Mahele turned our 'aina into a commodity, private property. This was considered the big land rip-off. Shortly thereafter foreigners could and did own Hawaiian land. There was fear that this water use registration could be our "Water Mahele," only this time it would be our great water theft. Though the state water code came into effect last year, the state admitted they

. did little to alert the public to the deadline for filing water use declarations.

Dr. Chang and his associates, with the help of OHA, held statewide workshops to educate people about the new water code, and to help them register and even measure their water use if necessary. Water Rights Week was proclaimed through May 17 and law students traveled state­wide at their own expense, these lawyers and law students (with the help of some donations), volunteered their time to travel statewide alerting our people to the importance of registering for their water use. A toll-free 800 phone number was set up to answer questions. Chang and Hawaiian attorney Elizabeth Pa Martin also came before the OHA Board of Trustees which is supportive of their endeavors.

Wal ka ola: water Is life The tiny article of a few lines in the Hawaii

Tribune Herald of May 14 entitled "The Depart­ment of Health says Fish Eaters, Beware," should be a concern to all of us. As island people fish is a vital part of our diet and daily lives.

The death of two dolphins from the Waikoloa Hyatt Hotel has been attributed to ciguate'ra picked up from mullet they ate. There has been a rash of ciguatera cases in our island populace of late; and the Department of Health warns us not to eat fish caught in West Hawaii.

Is it possible that fish are getting ciguatera because of developments along the coastline? A Hawaiian friend told me that the lime used in building the hotels along the coastline is hosed. toward makai side. Could it be that lime and other pollutants from the construction sites and chemi­cals from golf courses ho'opilau the sea, contami­nate the fish, killed those dolphins, and could pos­sibly kill us? This lime ends up polluting the water· and gets into the fish and creates the toxin called ciguatera. The DOH warns us. that humans, too, can die from this toxic disease.

Over 73 rare anchialine ponds (home of the en­dangered species opae-ula) were destroyed by the developers of the Hyatt Hotel at Waikoloa. In my opinion as trustee of OHA there is a strong link between the destruction of this ecosystem and the death of the dolphins. These exceptional anchia­line ponds have been replaced by man-made lagoons.

Bad enough air pollution and destruction of forests is contributing to drought, green-house effect, and destruction of our planet's ozone layer. But now these resort developments, that we local people cannot afford to frequent, are polluting our ocean and making it so we are warned not to eat our own fish! People should be outraged! Greed, destruction, and carelessness are hurting all of us. Our beloved brother, the late and sorely missed Wayne Westlake once told me that Hawaii's motto for our generation should be "we need less greed." It's something to consider, isn't it?

Stand up for our land and ocean before it's too late!

The front page of West Hawaii Today on June 7 carried an article entitled, "Marine Concerns Need Higher Priority, says Biologists." Several National Marine Fisheries biologists related that endangered green turtles and humpback whaies "are caught between a rock and a hard place . . . Encroaching are the land developers

that are destroying the creatures' dwindling habitat."

Biologist Gene Nitta pointed out that marine re­sources need to be considered before develop­ment begins. He spoke of how the endangered species are having their habitat slowly destroyed and no one is sure of the long term effects. Nitta

. stressed that each development project is studied separately, rather than looking 'at what all projects in an area will do to the local marine life and ecosystem. A more wholistic Aloha Aina ap­proach is imperative! As island people the ocean is like our refrigerator; we've got to protect our · ocean and our sea life.

The biologists main concern is the loss of habitat for endangered marine life. "Once we lose the habitat we lose the species," according to Nitta. He also stated endangered species such as the green turtles are virtually ignored when developers design projects. These experts also voiced concern for the potential impact of develop­ment at favorite Pine Trees, which is named Koha­naiki located a few miles from Kailua, Kona. First, E Kala mai i'au for a statement I made in my last column of June issue of Ka Wai Ola 0 OHA about the Bishop Estate. I had been told by several Kona residents that the Bishop Estate owned Pine Trees. This is not true; the Bishop Estate does not own Kohanaiki. However, regardless of who owns Kohanaiki it should not be developed. The owners, a local hui convinced the County Council to change the zoning of this area from conservation to resort last fall. As soon as they received their zone-change the hui sold this aina at a more than $30 million profit to Japanese Nansay Cor­poration. At the Wednesday, June 7th County Council meeting, Councilman Takashi Domingo showed his displeasure at the sale and high profits at the expense of the community after the rezoning passed. Biologists were also concerned because Kohanaiki is a resting place for humpback whales and their calves. I am happy to convey that at this time county council meeting the proposed Marina that was to be a pprt of this project was voted down by the County Council. However, there is a feeling there should be no resort at a!! at Pine Trees and that it should be !eft aione as a park for the community to enjoy.

Stand up all you people! Stand up for our aina and ocean. Don't wait until it's gone before you stand up!

Ua mau ke ea o ka 'aina i ka pono. With the kokua of OHA's Big Island staff, I helped to set up four highly informative workshops in Hilo, Naalehu, Ka'u, Waimea and in Kona. Artist Tomas Belsky designed striking posters to publi­cize these meetings. Gatherings were also held on Kaua'i, Maui, Moloka'i and O'ahu. During these sessions Dr. Chang (who is also an attorney) pointed out that the State Water Code could be interpreted to refer to not only current users of streams and wells, but also proposed uses as well. We Hawaiians are again being forced to shift gears. For hundreds of years before there was the United States of America we have used water-used it wisely and efficiently-now we are made to register for current and even possible future uses. We are wiser today than we were in the 1840s and all must know that we can·and will support our people with legitimate claims to water usage.

"In celebration bf taro" festival July 22

I encouraged OHA's Board of Trustees to claim on behalf of you, our people, the right to gather opae, hihiwai, and o'opu in every stream through­out these islands as part of our native gathering rights. We OHA trustees claim this right for you gatherers who may not Have had the opportunity to register yourself. Our water right also extends to the ocean and the right of fisherman to catch healthy, safe pollution-free fish. After discus-· sion with Dr. Chang, I filed (just a few minutes before the deadline) for the right of fisherman to catch safe, pollution-free fish.

Everything you wanted to know about the his­tory and cultural significance of taro will be fea­tured July 22 at the Windward Community Col­lege's "In Celebration ofT aro." The festival will be from 9 a.m. to 3 p.m. on the Windward Com­munity College Campus. It is being co-sponsored by the Native Hawaiian Health Task Force, Wind­ward Community College and Friends of Taro.

The festival will combine fun and educational activities-Hawaiian legends in storytelling, arts and crafts with taro, informative lectures on the role of taro in Hawaiian history and culture, raising taro and demonstrations on the various tech­niques used to prepare taro for eating and medi­cinal purposes.There will be huli (young taro shoots) available to take home to plant. Children's activities include learning the different parts of taro, poi pounding, and how to use simple taro or poi-based recipes. '

Different varieties of taro will be exhibited along with food booths featuring kulolo, taro chips, lau­lau and poi. Free taro recipes will be available. ·

For many centuries taro was the staple of the Hawaiian people. Today it has been termed "the forgotten food" because taro is less widely culti-

vated or used, according to Mitsue Cook-Carlson of Friends of Taro.

Native Hawaiian Task Force member Laurel Au Muneoka notes, "For Hawaiians, taro has been considered "a beloved older sibling" and its grow­ing pattern demonstrated the central concept of 'ohana (family and extended family). Planting, growing and eating taro reinforced important Hawaiian concepts of cooperation, contribution to the group, responsibility, sharing and that hard work was required to reap a crop."

The purpose of the festival is to educate the pub­lic about the importance of taro in the past, its value as a food source with multiple uses, and to encourage its increased use in the future.

For more information call the Windward Com­munity College Community Services Office at 235-7434.

More than 50 percent of adult Americans have blood cholesterol levels above 200 milligrams per deciliter, a level at which the risk of coronary heart disease begins to rise sharply, says the American Heart Association.

Page 164: application~ i~· ,~:,~P~'~------€¦ · linda lingle governor of hawaii state of hawaii department of land and natural resources commission on water resource management p.o.box621

'.Ao'ao ·lwakalua ·(Page 20) c:11 Oltl 0 Ofjf\ lulai tJuly) 1~8~

Makaku By Rocky Ka'iouliokahihikolo 'Ehu Jensen ©

Going boldly where thousands have gone before My grandmother's grandmother was a Kahuna

Ma-Kani, (spirit priest), she handed down the tradition to her children. My grandmother's grand­father was a Kahuna Kahea (priest of calling), he handed down the tradition to his children. They married each other. Their grandchild, my grand­mother, was the last KahunaMa-Kani-Kahea in my family. Because of one generation of interruption, I had to retrace the steps created by thousands of generations to re-establish only the understanding of such greatness!

My grandfather's grandfather was an 'Oiohe lua (martial arts expert), he handed down the tradition to his children. My grandmother's grand­father was an 'Oiohe ha'a (expert in sacred temple dance), and he handed the tradition down to his children and grand children, who married each other. My great-grandfather was the last 'Oiohe lua in my family. Because of two generations of interruption, I had to retrace the steps created by thousands of generations to re-establish only the understanding of such greatness!

I could go on indefinitely, the purpose being to show that much of our cultural past was misplaced because of another's deception. What do these vocations have in common? They represent thre~ of our Zen-Like art-forms which are on the verge of extinction. I say on the verge because although we don't practice the arts themselves we still retain the knowledge of each working society. And, un­less haste is made, these too will go the way of the dinosaurs. There were others to be sure, but these three were the most prominent in my family.

Those people who are acquainted with me know that I am a stauch advocate of reintroducing our

collective-mind to our former, tried and true philo­sophy. The understanding and representation of this lies in. the culture of a given people, and that culture expressed through the higkt arts. I know that I've championed this cause endlessly, but it bears repeating, lest those arts follow the path of the 'olohe, the kalai ki'i and a variety of kahuna. In my lectures, I have tried to dissuade our people from their fear of our past-our real past. I have dis­couraged the romantization of our history and our key historical figures. I have tried to explain the need for delving into understanding and accepting our esoteric culture as it was, and not as it is per­ceived to be. Sometimes, I feel that my words have fallen on deaf ears, my reputation suffering in the attempt.

We need our high arts as well as our philosophy as well as our m!,7ths but why isn't it recognized or respected?

We need our ancestral imagery as well as our canoes, but why aren't they recognized or respect­ed?

As much as I have presented the issue to our es­tablished entities, such as SFCA, NEA, etc., I be­lieve that the trouble lies within our own people.

If we cannot understand and appreciate our own problems, how can we expect others to assist in addressing them? We need dialogue amongst our own. But then, how do we come to a consensus when each separate ego tries desperately to outdo the other? Our revered scholar, Charles Kenn, once asked, "Do you know why Hawaiians will never see eye to eye on anything?" Of course, I answered, "No, why?" He volunteered, "Because, we are not unified spiritually. We are Catholics,

Haumea

Mormons, Episcopalians, Protestants, etcetera, first and Hawaiians second." At one time, we were Kanaka Maoli first and foremost!

Maika po mai 'oi 'a 'i 'o- Truth does not require belief in order to exist.

:;:::::::;:::::::::::::;:::;:;:;:::::::::::::::;:;:;:::::::::;:::::::::::::::::::::::::::::::;:;:::::::::::::::::::::::;:::::::::::::::::;:;:;:;:::::::::::;:;:;:;:;:;:;:;:::::::::::::::::::::;:;:::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::;:;:::::::::::::::::;:;:;:;:::::::::;:;:::::::::::;::::::::::::::::::::::::;:::;::;:;::::;:;:::;:;::::;:;::::::;:::::::::::::;:::::::::=:::;::;:;:;::::;::;:;:;::::;::;:;:::::::::;:;:;:;:;:;:;:::::::::::::::::::;:;:::::::::::::::::::::::::::;:::::::::::::::::::::::::::::;::::::::::::::::

'Ai Pono,

EOia By Terry Shintani, M.D .

. :: :;:;:: :; :::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::: :;:::::::::::::::;::::::: ;: ::::::::; :;:;:::::: ~=:: :::::::::::::::::::::::: ;: :: ;: ::::::::::::::::::::::::::::::::::::::: ;: ::::::::::::::::::::::::::: :; ::::::::::::::::::::::::::::::::::::::::::::::: ;: ::: :; :::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::: :;:::::::: ::: ;:::: :::::::::::::::::::::::::::::: :;: ::::::::::::::::::::::::::::::::::::::::::::::::::::::: :; ::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::: ;: ::::;:;:::: :; ::::::::

Weight loss, health and the Hawaiian diet The Wai'anae Diet

Prograrn, based on a traditional Hawaiian diet, will be starting. soon. It represents the joined efforts of the Wai'anae coast com­munity, including mem­bers of the Wai'anae and Nanakuli home­stead associations with the assistance of other

Hawaiians from Moloka'i and elsewhere in the state.

In past articles I have discussed how the tradi­tional Hawaiian diet helps to lower cholesterol and to reduce the risk of the number one killer of native Hawaiians-heart disease. The traditional Ha­waiian diet also helps us to lose weight and decrease our risk of diabetes.

When I tell people that the Hawaiian diet helps people to lose weight, it seems like a paradox. This . may be because so many people still believe it was natural for Hawaiians to be overweight.

In fact, this was not the case. In pre-Western contact Hawai'i, (that is, before Captain James Cook arrived in 1778), the average Hawaiian, the maka'ainana, was slender. In 1779, Captain James King, who ·sailed with Cook, stated in the ship's log, "The common people are of a slim rather than full habit ... "

How is this possible when we see so many obese individuals today? One of the reasons is that diet has changed drastically since that time. The ancient diet consisted of kalo, 'ulu (breadfruit), 'uala (sweet potato), uhi (yams), limu (seaweed), i'a (fish) and hua'ai (fruit). Total dietary fat was only 9 percent of the calories.

Today, with foods such as SP AM, beef, pork, macaroni salad, cheese, french fries and fast foods as our staples, dietary fat is up to 42 percent,

In a previous column, I discussed how "starch makes you skinny, and fat makes you fat." A 1985 study graphically illustrates this point: only three percent of mice who were fed a 13 percent fat diet became obese, or excessively fat. However, almost half of the mice who were fed a 45 percent fat diet became obese.

This pattern of increased obesity in high fat diets is found all over the world when people change from their low fat traditional diets to a high fat western diet. These studies suggest that dietary fat is directly related to the obesity found among people of the modem world, including Hawaiians.

Obesity also increases the risks of heart disease and cancer, and in the case of diabetes, raises the risk by 290 percent. In ancient times, diabetes was practically unknown in Hawai'i and in other tradi­tional cultures.· With the change to a modem high fat western diet, obesity and diabetes have both in­creased dramatically.

Today, Native Hawaiians have a diabetes rate

300-500 percent higher than that of the general public.

Does reducing dietary fat also decrease obesity and thereby reduce diabetes? A study in Samoa, a culture with a traditional diet similar to the Ha­waiian diet, has found this to be the case. An in­dividual who was placed on a 10 percent fat diet (similar to the fat content of his traditional diet) decreased his insulin requirement significantly within one month. While such a study is only pre­liminary, it is certainly encouraging to people with diabetes.

The Wai'anae Diet Program intends to help the participants lose weight naturally and decrease the risk of diabetes. These objectives are in addition to the objectives of reducing cholesterol and blood pressure, and increasing the survival of all Ha­waiian people.

If you would like. to know more about the Wai'anae Diet Program, or if you would like to

. kokua in any way with ideas or food donations, please call me at the Wai'anae Coast Comprehen­sive Health Center at

Dr. Shintani, Director of Prevention Health Services at the Waianae Coast Comprehensive Health Center, js a physician and nutritionist. He is also coordinator of their Malam a Ola preventive health program. A majority of the Center's clients are native Hawaiians.