TransWest Express EIS

Final EIS 2015

Appendix M Project Impact Analyses Results by Segment

Page 2: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

TransWest Express EIS Appendix M – Segment-level Analysis Results M-1

Final EIS

M. Project Impact Analyses Results by Segment

M.1 Introduction

Appendix M contains GIS analysis results at the segment-level, when available, to provide the Final EIS reader with the ability to produce an estimate of impacts on any combination of Final EIS segments for the resource analyses results that are provided. The data are contained in a Microsoft EXCEL file for accessibility and ease of use.

M.2 Limitations

This is not an exhaustive list of analyses results, nor is it expected to exactly replicate EIS results. The data is provided as a courtesy based on public comment, and should be used as an indicator of magnitude of potential Project effects. This appendix provides GIS analysis results at the segment-level detail as a “snapshot” of the process used to produce the alternative-level results provided in the Final EIS. Because this data is provided as a “snapshot” in time, and because it was extracted at a point prior to the completion of the analysis process, it may not always perfectly match the results provided in the Final EIS.

A case-in-point is the count of raptor nests within one mile of potential disturbance areas; because the Final EIS analysis considered complete alternatives that begin and end at the Regions, the results in the Final EIS avoid double-counting nests that may be located in the overlap that the intersection of segments creates (e.g., in the case of nests within one mile, it is a one-mile circle around the location that segments meet).

An example of data that could not be included at a segment-level is the results of the Lands with Wilderness Characteristics analysis. This analysis depended upon complete alternatives because individual segments can cross a portion and then end within an identified unit, but not completely split the unit. When considered as a complete alternative, this potential only occurs at three locations across the Project area (where the Project regions meet) instead of at numerous locations. Therefore, the Lands with Wilderness Characteristics analysis was not performed at the segment level.

Other steps in the analysis process that may cause a difference between this appendix and the Final EIS include the final data quality assurance and quality control checks of the document, rounding errors, and professional editing by the resource specialists.

M.3 Data Descriptions

M.3.1 Impact Type Definitions Used in Descriptions

• Construction Disturbance: estimated disturbed area during construction.

• Operation Disturbance: estimated disturbed area after the construction of Project.

• Spatial Intersection: area of individual resource identified within specific area, e.g., distance from alignment or within refined transmission corridor.

• Miles Crossed: length of alignment crossing resource.

• Count: number of individual resources within specific area.

Page 3: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

TransWest Express EIS Appendix M – Segment-level Analysis Results M-2

Final EIS

M.3.2 Data Field Descriptions

• Resource Detail: defines details regarding the Subject.

• Results: provides the quantified result of the analysis.

• Result Type: defines what the result represents.

• Segment: indicates the segment ID number as depicted in the Final EIS.

• Subject: identifies the resource subject that is defined.

• Units: defines the units of the quantified result.

M.3.2.1 Resource Details Included in Data Fields by Subject

Aquatic/Special Status Aquatic Species

RIPARIAN (Construction & Operation Disturbance): National Hydrography Dataset (USGS)

- Waterbody -100 ft/300ft buffer–lakes and ponds buffered by 100 feet and 300 feet.

- Streams- 100ft/300ft buffer streams and rivers buffered by 100 feet and 300 feet.

Cultural Resources

NRHP (Spatial Intersection): National Register of Historic Places

- Eligible

- Listed

- Unevaluated

TCP (Spatial Intersection): Traditional Cultural Property

SITE DENSITY (Spatial Intersection): number of sites per 100 acres.

SVYPCT (Spatial Intersection): percent of segment previously surveyed for cultural resources.

Geology

PFYC (Spatial Intersection):- Potential Fossil Yield Class the potential of fossil occurrences within the geologic units. Class 1 has the lowest potential whereas Class 5 has the highest potential.

Health and Saftey

COMMUNICATION SITES (Spatial Intersection): Federal Communications Commission (FCC) data.

Land Use and Planning

OWNERSHIP (Spatial Intersection): surface jurisdiction

RNG – Range/Grazing allotments

- [Agency]#[Allotment Name]#[Allotment Number]#[Total Acres of Allotment], e.g., “BLM#DALEY RANCH#00605#26194.3177578851”

FM – Forest Management

- [Forest Name] –[Unit Name; Prescription], e.g., “Uinta-Wasatch-Cache National Forest - 10 UPPER SPANISH FORK CANYON; Rx:3.3”

Page 4: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

TransWest Express EIS Appendix M – Segment-level Analysis Results M-3

Final EIS

Public Health and Safety

PUBLIC_SAFET-SENSREC – sensitive receptors such as schools or churches within 500 feet of alignment

STRUCTURES

- Within 200 feet of alignment, including information on the classification of structure use

- Within 500 feet of alignment, including information on the classification of structure use

Recreation

REC (Construction Disturbance, Operation Disturbance): Recreation area (other than SMAs)

[Recreation classification]#{name of location]

Soils/Water

SOILS (Construction Disturbance, Operation Disturbance): Soil limitation characteristics based on SSURGO or General Soils Mapping (NRCS):

- Compaction Prone

- Corrosion Concrete

- Corrosion Steel

- Hydric

- LRP (Limited Revegetation Potential)

- Prime Farmland

- Shallow Bedrock

- Shallow Excavations

- Shrink Swell

- Small Commercial Buildings

- Water Erosion - Severe

- Wind Erosion - Sever

Water Erosion by HUC (Construction Disturbance, Operation Disturbance): disturbance to soils severely prone to water erosion by HUC10 (Hydrologic Unit Code 10-digit)

Special Designation Areas

SMA (Spatial Intersection) Special Management Areas: Areas established by federal agencies that are managed for special designations.

[Special Designation Area Type]$[Name]$[subunit]$[Total Acres], Note: In many cases the subunit does not exist and will be presented as $$; e.g., “ $Badger Wash ACEC$$1885.32598112883”

Special Designation Area Types

- ACEC: Area of Critical Environmental Concern

- CE: Conservation Easement

- CWMU: Cooperative Wildlife Management Unit

- DRUA: Dispersed Recreation Area

- HT: Historic Trail

- NCA: National Conservation Area

- NM: National Monument

- nonWSA WCR: Non Wilderness Study Area/ Wilderness Characteristics

- NRA: National Recreation Area

- NWR: National Wildlife Refuge

- Prop Wild: Proposed Wilderness

- RA: Recreation Area

Page 5: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

TransWest Express EIS Appendix M – Segment-level Analysis Results M-4

Final EIS

IRA (Spatial Intersection): Inventoried Roadless Area

- [National Forest Name ]- [IRA Name], e.g., “Ashley National Forest-0401010”

Vegetation/Special Status Plant Species

VEG (Construction Disturbance, Operation Disturbance): Vegetation classification groupings based on ReGAP data.

WETLAND (Construction Disturbance, Operation Disturbance): Wetland vegetation classification groupings based on ReGAP data.

SSPS (Construction Disturbance, Operation Disturbance

- Las Vegas Buckwheat Habitat Model

Visual Resources

Landscape Scenery (Spatial Intersection): A visual quality rating system; Low, Moderate, High.

BLM VRI Class Impacts: Visual Resource Inventory classifications.

BLM VRM Class Impacts: Visual Resource Management classifications.

Viewer Sensitivity Buffer:

- Moderate (Miles): Buffer distance based off of travel routes, recreation areas, hotels, museums, educational facilities, greenbelt, city/municipal parks.

- High (Miles): Buffer distance based off of Scenic Byways, National Historic Trails, Historic Roads, Residences, Roadless areas, Special Management areas, and water bodies.

Scenic Quality: A=scenic quality rating score of 19 or more; B= scenic quality rating score of 12-18 or less; C=scenic quality rating score of 11 or less; N=Not rated.

USFS SIO VQO Class Impacts: Scenic Integrity Objectives or Visual Quality Objective classifications.

Wild Horses

HMA (Construction Disturbance, Operation Disturbance, Spatial Intersection): Herd Management Area [HMA Name] ([HMA ID])

Wildlife/Special Status Wildlife Species/Migratory Birds

GSG-OCCUPIEDLEKS (count): Greater sage-grouse occupied leks within 4 miles

GSG HABITAT (Construction Disturbance, Operation Disturbance): Greater sage-grouse habitats.

- CO-PGH - Preliminary General Habitat in Colorado (CPW).

- CO-PPH - Preliminary Priority Habitat in Colorado (CPW).

- WY-Core - Governor’s Core Areas in Wyoming (WGF), also indicates name of core area.

- UT-occupied; UT-Winter; UT-brood-rearing - Occupied, Winter, and Brood-rearing habitats in Utah (UDWR)

Page 6: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

TransWest Express EIS Appendix M – Segment-level Analysis Results M-5

Final EIS

GSG-PAC (Construction Disturbance; Operation Disturbance): Greater sage-grouse Priority Areas of Concern as defined by COT (2014) (USFWS)

BHCA (Construction Disturbance; Operation Disturbance): Bird Habitat Conservation Area

BIG GAME (Construction Disturbance; Operation Disturbance): Big game habitats as defined by respective states.

CRITICALHAB (Construction Disturbance; Operation Disturbance): USFWS-defined critical habitats for federally-listed species

DTORT (Construction Disturbance; Operation Disturbance): USFWS-defined critical habitat and USGS-defined habitat (value greater than 0.6) for Mojave Desert tortoise.

IBA (Construction Disturbance; Operation Disturbance): Important Bird Areas as defined by Audubon Society.

RAPTORS (Count): Number of raptor nests within one mile of potential disturbance areas.

WTPD (Construction Disturbance; Operation Disturbance): White-tailed prairie dog.

SSWS (Construction Disturbance; Operation Disturbance): Other federally-listed species.

- California condor

- Canada lynx

- Gray wolf

- SWFL Sothwestern willow flycatcher

- North American wolverine

- WYBC Western yellow-billed Cuckoo

- Yuma Clapper Rail

Page 7: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

Subject Segment Resource Detail Results Units Result TypeBHCA 1115 WY-38: Powder Rim 45.50 Acres Construction DisturbanceBHCA 1115 WY-38: Powder Rim 8.66 Acres Operation DisturbanceBHCA 1116 CO-32: Routt and Mofat County Uplands 0.02 Acres Construction DisturbanceBHCA 1116 CO-32: Routt and Mofat County Uplands 0.01 Acres Operation DisturbanceBHCA 1116 WY-38: Powder Rim 105.09 Acres Construction DisturbanceBHCA 1116 WY-38: Powder Rim 20.39 Acres Operation DisturbanceBHCA 1120 WY-38: Powder Rim 33.13 Acres Construction DisturbanceBHCA 1120 WY-38: Powder Rim 6.84 Acres Operation DisturbanceBHCA 1120.1 WY-38: Powder Rim 34.98 Acres Construction DisturbanceBHCA 1120.1 WY-38: Powder Rim 10.06 Acres Operation DisturbanceBHCA 1120.2 WY-38: Powder Rim 47.42 Acres Construction DisturbanceBHCA 1120.2 WY-38: Powder Rim 7.88 Acres Operation DisturbanceBHCA 1180 WY-38: Powder Rim 64.31 Acres Construction DisturbanceBHCA 1180 WY-38: Powder Rim 12.99 Acres Operation DisturbanceBHCA 1187 CO-28: Yampa River in Mofat County 19.37 Acres Construction DisturbanceBHCA 1187 CO-28: Yampa River in Mofat County 5.51 Acres Operation DisturbanceBHCA 1187 CO-32: Routt and Mofat County Uplands 423.70 Acres Construction DisturbanceBHCA 1187 CO-32: Routt and Mofat County Uplands 115.37 Acres Operation DisturbanceBHCA 1187 WY-38: Powder Rim 14.32 Acres Construction DisturbanceBHCA 1187 WY-38: Powder Rim 3.10 Acres Operation DisturbanceBHCA 1190 CO-21: Yampa River in Routt County 34.78 Acres Construction DisturbanceBHCA 1190 CO-21: Yampa River in Routt County 6.96 Acres Operation DisturbanceBHCA 1190 CO-28: Yampa River in Mofat County 254.32 Acres Construction DisturbanceBHCA 1190 CO-28: Yampa River in Mofat County 54.80 Acres Operation DisturbanceBHCA 1190 CO-32: Routt and Mofat County Uplands 866.45 Acres Construction DisturbanceBHCA 1190 CO-32: Routt and Mofat County Uplands 185.83 Acres Operation DisturbanceBHCA 1190 WY-39: Little Snake River 48.31 Acres Construction DisturbanceBHCA 1190 WY-39: Little Snake River 10.53 Acres Operation DisturbanceBHCA 1217.01 UT-37: Green River 38.44 Acres Construction DisturbanceBHCA 1217.01 UT-37: Green River 10.96 Acres Operation DisturbanceBHCA 1217.02 UT-27: Emma Park 2.45 Acres Construction DisturbanceBHCA 1217.02 UT-27: Emma Park 0.65 Acres Operation DisturbanceBHCA 1217.051 UT-27: Emma Park 62.49 Acres Construction DisturbanceBHCA 1217.051 UT-27: Emma Park 15.16 Acres Operation DisturbanceBHCA 1217.1 UT-27: Emma Park 1.44 Acres Construction DisturbanceBHCA 1217.1 UT-27: Emma Park 0.47 Acres Operation DisturbanceBHCA 1219.4 UT-27: Emma Park 15.03 Acres Construction DisturbanceBHCA 1219.4 UT-27: Emma Park 6.94 Acres Operation DisturbanceBHCA 1219.45 UT-27: Emma Park 0.72 Acres Construction DisturbanceBHCA 1219.45 UT-27: Emma Park 0.26 Acres Operation DisturbanceBHCA 1220 CO-17: Colo Nat Mon; Rabbit Valley; uplands 28.25 Acres Construction DisturbanceBHCA 1220 CO-17: Colo Nat Mon; Rabbit Valley; uplands 8.32 Acres Operation DisturbanceBHCA 1220 CO-30: White River 230.99 Acres Construction DisturbanceBHCA 1220 CO-30: White River 48.09 Acres Operation Disturbance

Page 8: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

BHCA 1220 CO-31: Roan Plateau; Piceance Creek; Cathedral Bluffs 1184.66 Acres Construction DisturbanceBHCA 1220 CO-31: Roan Plateau; Piceance Creek; Cathedral Bluffs 259.64 Acres Operation DisturbanceBHCA 1220 UT-37: Green River 33.70 Acres Construction DisturbanceBHCA 1220 UT-37: Green River 7.66 Acres Operation DisturbanceBHCA 1220 UT-41: Cisco Desert 397.69 Acres Construction DisturbanceBHCA 1220 UT-41: Cisco Desert 117.44 Acres Operation DisturbanceBHCA 1223 UT-36: Summerhouse Spring 30.85 Acres Construction DisturbanceBHCA 1223 UT-36: Summerhouse Spring 5.92 Acres Operation DisturbanceBHCA 1320.05 UT-25: Upper Green River 24.63 Acres Construction DisturbanceBHCA 1320.05 UT-25: Upper Green River 24.63 Acres Construction DisturbanceBHCA 1320.05 UT-25: Upper Green River 5.05 Acres Operation DisturbanceBHCA 1320.05 UT-25: Upper Green River 5.05 Acres Operation DisturbanceBHCA 1320.15 UT-29: Nebo Creek 117.99 Acres Construction DisturbanceBHCA 1320.15 UT-29: Nebo Creek 117.99 Acres Construction DisturbanceBHCA 1320.15 UT-29: Nebo Creek 50.87 Acres Operation DisturbanceBHCA 1320.15 UT-29: Nebo Creek 50.87 Acres Operation DisturbanceBHCA 1321 UT-21: Duchesne River 22.15 Acres Construction DisturbanceBHCA 1321 UT-21: Duchesne River 3.76 Acres Operation DisturbanceBHCA 1321.01 UT-21: Duchesne River 21.87 Acres Construction DisturbanceBHCA 1321.01 UT-21: Duchesne River 3.74 Acres Operation DisturbanceBHCA 1323 UT-20: Upper Strawberry/Avintaquin 136.47 Acres Construction DisturbanceBHCA 1323 UT-20: Upper Strawberry/Avintaquin 43.62 Acres Operation DisturbanceBHCA 1323.02 UT-20: Upper Strawberry/Avintaquin 128.96 Acres Construction DisturbanceBHCA 1323.02 UT-20: Upper Strawberry/Avintaquin 42.65 Acres Operation DisturbanceBHCA 1324 UT-20: Upper Strawberry/Avintaquin 71.63 Acres Construction DisturbanceBHCA 1324 UT-20: Upper Strawberry/Avintaquin 71.64 Acres Construction DisturbanceBHCA 1324 UT-20: Upper Strawberry/Avintaquin 28.47 Acres Operation DisturbanceBHCA 1324 UT-20: Upper Strawberry/Avintaquin 28.48 Acres Operation DisturbanceBHCA 1324.2 UT-20: Upper Strawberry/Avintaquin 78.48 Acres Construction DisturbanceBHCA 1324.2 UT-20: Upper Strawberry/Avintaquin 28.82 Acres Operation DisturbanceBHCA 1324.4 UT-20: Upper Strawberry/Avintaquin 94.82 Acres Construction DisturbanceBHCA 1324.4 UT-20: Upper Strawberry/Avintaquin 29.16 Acres Operation DisturbanceBHCA 1325 UT-20: Upper Strawberry/Avintaquin 0.31 Acres Construction DisturbanceBHCA 1325 UT-20: Upper Strawberry/Avintaquin 0.31 Acres Construction DisturbanceBHCA 1325 UT-20: Upper Strawberry/Avintaquin 0.15 Acres Operation DisturbanceBHCA 1325 UT-20: Upper Strawberry/Avintaquin 0.15 Acres Operation DisturbanceBHCA 1325.1 UT-21: Duchesne River 53.29 Acres Construction DisturbanceBHCA 1325.1 UT-21: Duchesne River 12.99 Acres Operation DisturbanceBHCA 1325.2 UT-27: Emma Park 4.80 Acres Construction DisturbanceBHCA 1325.2 UT-27: Emma Park 1.31 Acres Operation DisturbanceBHCA 1330.1 UT-30: Sevier Bridge/Chicken Creek 3.47 Acres Construction DisturbanceBHCA 1330.1 UT-30: Sevier Bridge/Chicken Creek 1.23 Acres Operation DisturbanceBHCA 1340 UT-16: Utah Lake/Mona Lake/Tintic Val 39.09 Acres Construction DisturbanceBHCA 1340 UT-16: Utah Lake/Mona Lake/Tintic Val 7.20 Acres Operation DisturbanceBHCA 1360 UT-16: Utah Lake/Mona Lake/Tintic Val 7.98 Acres Construction Disturbance

Page 9: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

BHCA 1360 UT-16: Utah Lake/Mona Lake/Tintic Val 7.98 Acres Construction DisturbanceBHCA 1360 UT-16: Utah Lake/Mona Lake/Tintic Val 2.82 Acres Operation DisturbanceBHCA 1360 UT-16: Utah Lake/Mona Lake/Tintic Val 2.82 Acres Operation DisturbanceBHCA 1370 UT-30: Sevier Bridge/Chicken Creek 142.24 Acres Construction DisturbanceBHCA 1370 UT-30: Sevier Bridge/Chicken Creek 32.41 Acres Operation DisturbanceBHCA 1380 UT-31: Delta 64.43 Acres Construction DisturbanceBHCA 1380 UT-31: Delta 9.20 Acres Operation DisturbanceBHCA 1400 UT-30: Sevier Bridge/Chicken Creek 279.02 Acres Construction DisturbanceBHCA 1400 UT-30: Sevier Bridge/Chicken Creek 61.43 Acres Operation DisturbanceBHCA 1410 UT-30: Sevier Bridge/Chicken Creek 0.14 Acres Construction DisturbanceBHCA 1410 UT-30: Sevier Bridge/Chicken Creek 0.02 Acres Operation DisturbanceBHCA 1410 UT-31: Delta 26.39 Acres Construction DisturbanceBHCA 1410 UT-31: Delta 6.68 Acres Operation DisturbanceBHCA 1460 UT-31: Delta 50.45 Acres Construction DisturbanceBHCA 1460 UT-31: Delta 11.31 Acres Operation DisturbanceBHCA 1500 UT-45: Bald Hills 0.12 Acres Construction DisturbanceBHCA 1500 UT-45: Bald Hills 0.04 Acres Operation DisturbanceBHCA 1501.1 UT-48: Virgin River 65.04 Acres Construction DisturbanceBHCA 1501.1 UT-48: Virgin River 14.36 Acres Operation DisturbanceBHCA 1501.15 UT-48: Virgin River 20.43 Acres Construction DisturbanceBHCA 1501.15 UT-48: Virgin River 4.52 Acres Operation DisturbanceBHCA 1502.5 UT-47: Beaver Dam Wash 22.94 Acres Construction DisturbanceBHCA 1502.5 UT-47: Beaver Dam Wash 5.96 Acres Operation DisturbanceBHCA 1502.5 UT-48: Virgin River 120.56 Acres Construction DisturbanceBHCA 1502.5 UT-48: Virgin River 22.01 Acres Operation DisturbanceBHCA 1505 UT-48: Virgin River 19.45 Acres Construction DisturbanceBHCA 1505 UT-48: Virgin River 7.19 Acres Operation DisturbanceBHCA 1506 UT-48: Virgin River 237.38 Acres Construction DisturbanceBHCA 1506 UT-48: Virgin River 53.51 Acres Operation DisturbanceBHCA 1520 NV-27: Lincoln 42.00 Acres Construction DisturbanceBHCA 1520 NV-27: Lincoln 11.44 Acres Operation DisturbanceBHCA 1520 NV-6: Pahranagat/Dry Lake Valley 64.71 Acres Construction DisturbanceBHCA 1520 NV-6: Pahranagat/Dry Lake Valley 9.34 Acres Operation DisturbanceBHCA 1540.1 NV-5: Lower Muddy River 29.38 Acres Construction DisturbanceBHCA 1540.1 NV-5: Lower Muddy River 3.96 Acres Operation DisturbanceBHCA 1540.2 NV-5: Lower Muddy River 13.44 Acres Construction DisturbanceBHCA 1540.2 NV-5: Lower Muddy River 3.79 Acres Operation DisturbanceBHCA 1545 NV-5: Lower Muddy River 15.28 Acres Construction DisturbanceBHCA 1545 NV-5: Lower Muddy River 2.72 Acres Operation DisturbanceBHCA 1550.1 NV-5: Lower Muddy River 44.94 Acres Construction DisturbanceBHCA 1550.1 NV-5: Lower Muddy River 12.45 Acres Operation DisturbanceBHCA 1560 NV-5: Lower Muddy River 0.86 Acres Construction DisturbanceBHCA 1560 NV-5: Lower Muddy River 0.20 Acres Operation DisturbanceBHCA 1570 NV-5: Lower Muddy River 12.56 Acres Construction DisturbanceBHCA 1570 NV-5: Lower Muddy River 2.49 Acres Operation Disturbance

Page 10: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

BHCA 1660 NV-5: Lower Muddy River 53.78 Acres Construction DisturbanceBHCA 1660 NV-5: Lower Muddy River 11.56 Acres Operation DisturbanceBHCA 1670 NV-5: Lower Muddy River 33.56 Acres Construction DisturbanceBHCA 1670 NV-5: Lower Muddy River 9.64 Acres Operation DisturbanceBHCA 1680 NV-5: Lower Muddy River 75.29 Acres Construction DisturbanceBHCA 1680 NV-5: Lower Muddy River 20.48 Acres Operation DisturbanceBHCA 1690 NV-5: Lower Muddy River 58.56 Acres Construction DisturbanceBHCA 1690 NV-5: Lower Muddy River 16.99 Acres Operation DisturbanceBHCA 1700 NV-5: Lower Muddy River 9.08 Acres Construction DisturbanceBHCA 1700 NV-5: Lower Muddy River 1.41 Acres Operation DisturbanceBHCA 1710 NV-5: Lower Muddy River 128.64 Acres Construction DisturbanceBHCA 1710 NV-5: Lower Muddy River 37.23 Acres Operation DisturbanceBHCA 1730 NV-5: Lower Muddy River 1.00 Acres Construction DisturbanceBHCA 1730 NV-5: Lower Muddy River 0.10 Acres Operation DisturbanceBHCA 1750 NV-5: Lower Muddy River 0.79 Acres Construction DisturbanceBHCA 1750 NV-5: Lower Muddy River 0.16 Acres Operation DisturbanceBHCA 1771 NV-5: Lower Muddy River 0.05 Acres Construction DisturbanceBHCA 1771 NV-5: Lower Muddy River 0.02 Acres Operation DisturbanceBHCA 1771 NV-7: Piute/Eldorado/Fenner DWMA 44.86 Acres Construction DisturbanceBHCA 1771 NV-7: Piute/Eldorado/Fenner DWMA 9.19 Acres Operation DisturbanceBIG GAME 1030 Wyoming-Mule Deer crucial winter/yearlong 32.03 Acres Construction DisturbanceBIG GAME 1030 Wyoming-Mule Deer crucial winter/yearlong 8.25 Acres Operation DisturbanceBIG GAME 1030 Wyoming-Pronghorn crucial winter/yearlong 51.07 Acres Construction DisturbanceBIG GAME 1030 Wyoming-Pronghorn crucial winter/yearlong 11.55 Acres Operation DisturbanceBIG GAME 1100 Colorado-Pronghorn-severe_winter 0.67 Acres Construction DisturbanceBIG GAME 1100 Colorado-Pronghorn-severe_winter 0.33 Acres Operation DisturbanceBIG GAME 1100 Colorado-Rocky Mtn. Elk-Severe Winter 85.33 Acres Construction DisturbanceBIG GAME 1100 Colorado-Rocky Mtn. Elk-Severe Winter 19.70 Acres Operation DisturbanceBIG GAME 1101 Colorado-Pronghorn-severe_winter 16.14 Acres Construction DisturbanceBIG GAME 1101 Colorado-Pronghorn-severe_winter 2.37 Acres Operation DisturbanceBIG GAME 1101 Colorado-Rocky Mtn. Elk-Severe Winter 16.14 Acres Construction DisturbanceBIG GAME 1101 Colorado-Rocky Mtn. Elk-Severe Winter 2.37 Acres Operation DisturbanceBIG GAME 1103 Colorado-Mule Deer-severe_winter 8.95 Acres Construction DisturbanceBIG GAME 1103 Colorado-Mule Deer-severe_winter 1.79 Acres Operation DisturbanceBIG GAME 1103 Colorado-Pronghorn-severe_winter 15.52 Acres Construction DisturbanceBIG GAME 1103 Colorado-Pronghorn-severe_winter 2.51 Acres Operation DisturbanceBIG GAME 1103 Colorado-Rocky Mtn. Elk-Severe Winter 32.48 Acres Construction DisturbanceBIG GAME 1103 Colorado-Rocky Mtn. Elk-Severe Winter 4.89 Acres Operation DisturbanceBIG GAME 1104 Colorado-Mule Deer-severe_winter 21.86 Acres Construction DisturbanceBIG GAME 1104 Colorado-Mule Deer-severe_winter 4.73 Acres Operation DisturbanceBIG GAME 1104 Colorado-Rocky Mtn. Elk-Severe Winter 12.73 Acres Construction DisturbanceBIG GAME 1104 Colorado-Rocky Mtn. Elk-Severe Winter 3.13 Acres Operation DisturbanceBIG GAME 1105 Colorado-Mule Deer-severe_winter 38.10 Acres Construction DisturbanceBIG GAME 1105 Colorado-Mule Deer-severe_winter 7.74 Acres Operation DisturbanceBIG GAME 1105 Colorado-Rocky Mtn. Elk-Severe Winter 5.81 Acres Construction Disturbance

Page 11: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

BIG GAME 1105 Colorado-Rocky Mtn. Elk-Severe Winter 1.14 Acres Operation DisturbanceBIG GAME 1106 Colorado-Pronghorn-severe_winter 3.36 Acres Construction DisturbanceBIG GAME 1106 Colorado-Pronghorn-severe_winter 0.56 Acres Operation DisturbanceBIG GAME 1106 Colorado-Rocky Mtn. Elk-Severe Winter 58.31 Acres Construction DisturbanceBIG GAME 1106 Colorado-Rocky Mtn. Elk-Severe Winter 11.60 Acres Operation DisturbanceBIG GAME 1115 Wyoming-Mule Deer crucial winter/yearlong 69.12 Acres Construction DisturbanceBIG GAME 1115 Wyoming-Mule Deer crucial winter/yearlong 13.52 Acres Operation DisturbanceBIG GAME 1115 Wyoming-Pronghorn crucial winter/yearlong 121.48 Acres Construction DisturbanceBIG GAME 1115 Wyoming-Pronghorn crucial winter/yearlong 23.40 Acres Operation DisturbanceBIG GAME 1116 Wyoming-Mule Deer crucial winter/yearlong 84.61 Acres Construction DisturbanceBIG GAME 1116 Wyoming-Mule Deer crucial winter/yearlong 16.35 Acres Operation DisturbanceBIG GAME 1116 Wyoming-Pronghorn crucial winter/yearlong 105.08 Acres Construction DisturbanceBIG GAME 1116 Wyoming-Pronghorn crucial winter/yearlong 20.38 Acres Operation DisturbanceBIG GAME 1116 Wyoming-Rocky Mtn. Elk crucial winter/yearlong 12.69 Acres Construction DisturbanceBIG GAME 1116 Wyoming-Rocky Mtn. Elk crucial winter/yearlong 2.34 Acres Operation DisturbanceBIG GAME 1120.1 Wyoming-Pronghorn crucial winter/yearlong 3.21 Acres Construction DisturbanceBIG GAME 1120.1 Wyoming-Pronghorn crucial winter/yearlong 0.68 Acres Operation DisturbanceBIG GAME 1120.2 Wyoming-Mule Deer crucial winter/yearlong 0.20 Acres Construction DisturbanceBIG GAME 1120.2 Wyoming-Mule Deer crucial winter/yearlong 0.05 Acres Operation DisturbanceBIG GAME 1120.2 Wyoming-Pronghorn crucial winter/yearlong 7.78 Acres Construction DisturbanceBIG GAME 1120.2 Wyoming-Pronghorn crucial winter/yearlong 1.55 Acres Operation DisturbanceBIG GAME 1180 Wyoming-Mule Deer crucial winter/yearlong 47.86 Acres Construction DisturbanceBIG GAME 1180 Wyoming-Mule Deer crucial winter/yearlong 9.61 Acres Operation DisturbanceBIG GAME 1180 Wyoming-Pronghorn crucial winter/yearlong 53.63 Acres Construction DisturbanceBIG GAME 1180 Wyoming-Pronghorn crucial winter/yearlong 10.82 Acres Operation DisturbanceBIG GAME 1180 Wyoming-Rocky Mtn. Elk crucial winter/yearlong 14.53 Acres Construction DisturbanceBIG GAME 1180 Wyoming-Rocky Mtn. Elk crucial winter/yearlong 2.72 Acres Operation DisturbanceBIG GAME 1187 Colorado-Mule Deer-severe_winter 316.64 Acres Construction DisturbanceBIG GAME 1187 Colorado-Mule Deer-severe_winter 81.17 Acres Operation DisturbanceBIG GAME 1187 Colorado-Pronghorn-severe_winter 208.78 Acres Construction DisturbanceBIG GAME 1187 Colorado-Pronghorn-severe_winter 51.00 Acres Operation DisturbanceBIG GAME 1187 Colorado-Rocky Mtn. Elk-Severe Winter 185.43 Acres Construction DisturbanceBIG GAME 1187 Colorado-Rocky Mtn. Elk-Severe Winter 49.73 Acres Operation DisturbanceBIG GAME 1187 Wyoming-Mule Deer crucial winter/yearlong 16.58 Acres Construction DisturbanceBIG GAME 1187 Wyoming-Mule Deer crucial winter/yearlong 3.63 Acres Operation DisturbanceBIG GAME 1187 Wyoming-Pronghorn crucial winter/yearlong 16.58 Acres Construction DisturbanceBIG GAME 1187 Wyoming-Pronghorn crucial winter/yearlong 3.63 Acres Operation DisturbanceBIG GAME 1187 Wyoming-Rocky Mtn. Elk crucial winter/yearlong 16.34 Acres Construction DisturbanceBIG GAME 1187 Wyoming-Rocky Mtn. Elk crucial winter/yearlong 3.52 Acres Operation DisturbanceBIG GAME 1190 Colorado-Mule Deer-severe_winter 883.23 Acres Construction DisturbanceBIG GAME 1190 Colorado-Mule Deer-severe_winter 189.83 Acres Operation DisturbanceBIG GAME 1190 Colorado-Pronghorn-severe_winter 542.75 Acres Construction DisturbanceBIG GAME 1190 Colorado-Pronghorn-severe_winter 116.40 Acres Operation DisturbanceBIG GAME 1190 Colorado-Rocky Mtn. Elk-Severe Winter 1347.44 Acres Construction DisturbanceBIG GAME 1190 Colorado-Rocky Mtn. Elk-Severe Winter 292.98 Acres Operation Disturbance

Page 12: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

BIG GAME 1190 Wyoming-Mule Deer crucial winter 14.56 Acres Construction DisturbanceBIG GAME 1190 Wyoming-Mule Deer crucial winter 5.79 Acres Operation DisturbanceBIG GAME 1190 Wyoming-Mule Deer crucial winter/yearlong 285.20 Acres Construction DisturbanceBIG GAME 1190 Wyoming-Mule Deer crucial winter/yearlong 66.91 Acres Operation DisturbanceBIG GAME 1190 Wyoming-Pronghorn crucial winter/yearlong 312.00 Acres Construction DisturbanceBIG GAME 1190 Wyoming-Pronghorn crucial winter/yearlong 78.07 Acres Operation DisturbanceBIG GAME 1190 Wyoming-Rocky Mtn. Elk crucial winter/yearlong 6.87 Acres Construction DisturbanceBIG GAME 1190 Wyoming-Rocky Mtn. Elk crucial winter/yearlong 1.77 Acres Operation DisturbanceBIG GAME 1210 Colorado-Mule Deer-severe_winter 270.69 Acres Construction DisturbanceBIG GAME 1210 Colorado-Mule Deer-severe_winter 51.83 Acres Operation DisturbanceBIG GAME 1210 Colorado-Rocky Mtn. Elk-Severe Winter 31.41 Acres Construction DisturbanceBIG GAME 1210 Colorado-Rocky Mtn. Elk-Severe Winter 11.21 Acres Operation DisturbanceBIG GAME 1210 CO-Mountain Lion-Overall-Range 312.09 Acres Construction DisturbanceBIG GAME 1210 CO-Mountain Lion-Overall-Range 61.60 Acres Operation DisturbanceBIG GAME 1210 CO-Mule Deer-Overall-Range 311.74 Acres Construction DisturbanceBIG GAME 1210 CO-Mule Deer-Overall-Range 61.43 Acres Operation DisturbanceBIG GAME 1210 CO-Mule Deer-Summer-Range 17.27 Acres Construction DisturbanceBIG GAME 1210 CO-Mule Deer-Summer-Range 8.03 Acres Operation DisturbanceBIG GAME 1210 CO-Mule Deer-Winter-Concentration 294.73 Acres Construction DisturbanceBIG GAME 1210 CO-Mule Deer-Winter-Concentration 56.93 Acres Operation DisturbanceBIG GAME 1210 CO-Mule Deer-Winter-Crucial 270.75 Acres Construction DisturbanceBIG GAME 1210 CO-Mule Deer-Winter-Crucial 51.84 Acres Operation DisturbanceBIG GAME 1210 CO-Mule Deer-Winter-Range 311.72 Acres Construction DisturbanceBIG GAME 1210 CO-Mule Deer-Winter-Range 61.42 Acres Operation DisturbanceBIG GAME 1210 CO-Pronghorn-Overall-Range 299.33 Acres Construction DisturbanceBIG GAME 1210 CO-Pronghorn-Overall-Range 55.66 Acres Operation DisturbanceBIG GAME 1210 CO-Pronghorn-Winter-Range 299.33 Acres Construction DisturbanceBIG GAME 1210 CO-Pronghorn-Winter-Range 55.66 Acres Operation DisturbanceBIG GAME 1210 CO-Rocky Mountain Elk-Overall-Range 311.85 Acres Construction DisturbanceBIG GAME 1210 CO-Rocky Mountain Elk-Overall-Range 61.48 Acres Operation DisturbanceBIG GAME 1210 CO-Rocky Mountain Elk-Winter-Concentration 140.86 Acres Construction DisturbanceBIG GAME 1210 CO-Rocky Mountain Elk-Winter-Concentration 28.59 Acres Operation DisturbanceBIG GAME 1210 CO-Rocky Mountain Elk-Winter-Crucial 31.39 Acres Construction DisturbanceBIG GAME 1210 CO-Rocky Mountain Elk-Winter-Crucial 11.21 Acres Operation DisturbanceBIG GAME 1210 CO-Rocky Mountain Elk-Winter-Range 311.74 Acres Construction DisturbanceBIG GAME 1210 CO-Rocky Mountain Elk-Winter-Range 61.43 Acres Operation DisturbanceBIG GAME 1210 Utah-Mule Deer winter crucial 0.00 Acres Construction DisturbanceBIG GAME 1210 Utah-Mule Deer winter crucial 0.00 Acres Operation DisturbanceBIG GAME 1210 UT-Mule Deer-Winter-Crucial 0.00 Acres Construction DisturbanceBIG GAME 1210 UT-Mule Deer-Winter-Crucial 0.00 Acres Operation DisturbanceBIG GAME 1210 UT-Pronghorn-Yearlong-Crucial/Parturition 0.55 Acres Construction DisturbanceBIG GAME 1210 UT-Pronghorn-Yearlong-Crucial/Parturition 0.09 Acres Operation DisturbanceBIG GAME 1211 Colorado-Mule Deer-severe_winter 0.00 Acres Construction DisturbanceBIG GAME 1211 Colorado-Mule Deer-severe_winter 0.00 Acres Operation DisturbanceBIG GAME 1211 CO-Mountain Lion-Overall-Range 0.00 Acres Construction Disturbance

Page 13: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

BIG GAME 1211 CO-Mountain Lion-Overall-Range 0.00 Acres Operation DisturbanceBIG GAME 1211 CO-Mule Deer-Overall-Range 0.00 Acres Construction DisturbanceBIG GAME 1211 CO-Mule Deer-Overall-Range 0.00 Acres Operation DisturbanceBIG GAME 1211 CO-Mule Deer-Winter-Concentration 0.00 Acres Construction DisturbanceBIG GAME 1211 CO-Mule Deer-Winter-Concentration 0.00 Acres Operation DisturbanceBIG GAME 1211 CO-Mule Deer-Winter-Crucial 0.00 Acres Construction DisturbanceBIG GAME 1211 CO-Mule Deer-Winter-Crucial 0.00 Acres Operation DisturbanceBIG GAME 1211 CO-Mule Deer-Winter-Range 0.00 Acres Construction DisturbanceBIG GAME 1211 CO-Mule Deer-Winter-Range 0.00 Acres Operation DisturbanceBIG GAME 1211 CO-Pronghorn-Overall-Range 0.00 Acres Construction DisturbanceBIG GAME 1211 CO-Pronghorn-Overall-Range 0.00 Acres Operation DisturbanceBIG GAME 1211 CO-Pronghorn-Winter-Range 0.00 Acres Construction DisturbanceBIG GAME 1211 CO-Pronghorn-Winter-Range 0.00 Acres Operation DisturbanceBIG GAME 1211 CO-Rocky Mountain Elk-Overall-Range 0.00 Acres Construction DisturbanceBIG GAME 1211 CO-Rocky Mountain Elk-Overall-Range 0.00 Acres Operation DisturbanceBIG GAME 1211 CO-Rocky Mountain Elk-Winter-Concentration 0.00 Acres Construction DisturbanceBIG GAME 1211 CO-Rocky Mountain Elk-Winter-Concentration 0.00 Acres Operation DisturbanceBIG GAME 1211 CO-Rocky Mountain Elk-Winter-Range 0.00 Acres Construction DisturbanceBIG GAME 1211 CO-Rocky Mountain Elk-Winter-Range 0.00 Acres Operation DisturbanceBIG GAME 1211 Utah-Mule Deer winter crucial 57.70 Acres Construction DisturbanceBIG GAME 1211 Utah-Mule Deer winter crucial 13.60 Acres Operation DisturbanceBIG GAME 1211 UT-Mule Deer-Winter-Crucial 57.70 Acres Construction DisturbanceBIG GAME 1211 UT-Mule Deer-Winter-Crucial 13.60 Acres Operation DisturbanceBIG GAME 1211 UT-Pronghorn-Yearlong-Crucial/Parturition 72.75 Acres Construction DisturbanceBIG GAME 1211 UT-Pronghorn-Yearlong-Crucial/Parturition 16.93 Acres Operation DisturbanceBIG GAME 1212 UT-Pronghorn-Yearlong-Crucial/Parturition 227.09 Acres Construction DisturbanceBIG GAME 1212 UT-Pronghorn-Yearlong-Crucial/Parturition 92.87 Acres Operation DisturbanceBIG GAME 1214 Colorado-Mule Deer-severe_winter 0.75 Acres Construction DisturbanceBIG GAME 1214 Colorado-Mule Deer-severe_winter 0.16 Acres Operation DisturbanceBIG GAME 1214 CO-Mountain Lion-Overall-Range 0.75 Acres Construction DisturbanceBIG GAME 1214 CO-Mountain Lion-Overall-Range 0.16 Acres Operation DisturbanceBIG GAME 1214 CO-Mule Deer-Overall-Range 0.75 Acres Construction DisturbanceBIG GAME 1214 CO-Mule Deer-Overall-Range 0.16 Acres Operation DisturbanceBIG GAME 1214 CO-Mule Deer-Winter-Concentration 0.75 Acres Construction DisturbanceBIG GAME 1214 CO-Mule Deer-Winter-Concentration 0.16 Acres Operation DisturbanceBIG GAME 1214 CO-Mule Deer-Winter-Crucial 0.75 Acres Construction DisturbanceBIG GAME 1214 CO-Mule Deer-Winter-Crucial 0.16 Acres Operation DisturbanceBIG GAME 1214 CO-Mule Deer-Winter-Range 0.75 Acres Construction DisturbanceBIG GAME 1214 CO-Mule Deer-Winter-Range 0.16 Acres Operation DisturbanceBIG GAME 1214 CO-Pronghorn-Overall-Range 0.75 Acres Construction DisturbanceBIG GAME 1214 CO-Pronghorn-Overall-Range 0.16 Acres Operation DisturbanceBIG GAME 1214 CO-Pronghorn-Winter-Range 0.75 Acres Construction DisturbanceBIG GAME 1214 CO-Pronghorn-Winter-Range 0.16 Acres Operation DisturbanceBIG GAME 1214 CO-Rocky Mountain Elk-Overall-Range 0.75 Acres Construction DisturbanceBIG GAME 1214 CO-Rocky Mountain Elk-Overall-Range 0.16 Acres Operation Disturbance

Page 14: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

BIG GAME 1214 CO-Rocky Mountain Elk-Winter-Concentration 0.74 Acres Construction DisturbanceBIG GAME 1214 CO-Rocky Mountain Elk-Winter-Concentration 0.15 Acres Operation DisturbanceBIG GAME 1214 CO-Rocky Mountain Elk-Winter-Range 0.75 Acres Construction DisturbanceBIG GAME 1214 CO-Rocky Mountain Elk-Winter-Range 0.16 Acres Operation DisturbanceBIG GAME 1214 Utah-Mule Deer winter crucial 48.75 Acres Construction DisturbanceBIG GAME 1214 Utah-Mule Deer winter crucial 11.03 Acres Operation DisturbanceBIG GAME 1214 UT-Mule Deer-Winter-Crucial 48.75 Acres Construction DisturbanceBIG GAME 1214 UT-Mule Deer-Winter-Crucial 11.03 Acres Operation DisturbanceBIG GAME 1214 UT-Pronghorn-Yearlong-Crucial/Parturition 132.89 Acres Construction DisturbanceBIG GAME 1214 UT-Pronghorn-Yearlong-Crucial/Parturition 30.91 Acres Operation DisturbanceBIG GAME 1215 UT-Pronghorn-Yearlong-Crucial/Parturition 92.48 Acres Construction DisturbanceBIG GAME 1215 UT-Pronghorn-Yearlong-Crucial/Parturition 20.38 Acres Operation DisturbanceBIG GAME 1215.05 UT-Pronghorn-Yearlong-Crucial/Parturition 140.69 Acres Construction DisturbanceBIG GAME 1215.05 UT-Pronghorn-Yearlong-Crucial/Parturition 42.95 Acres Operation DisturbanceBIG GAME 1217.01 Utah-Mule Deer winter crucial 33.13 Acres Construction DisturbanceBIG GAME 1217.01 Utah-Mule Deer winter crucial 6.88 Acres Operation DisturbanceBIG GAME 1217.01 Utah-Pronghorn year-long substantial 15.14 Acres Construction DisturbanceBIG GAME 1217.01 Utah-Pronghorn year-long substantial 5.47 Acres Operation DisturbanceBIG GAME 1217.01 Utah-Rocky Mtn. Bighorn year-long crucial 150.12 Acres Construction DisturbanceBIG GAME 1217.01 Utah-Rocky Mtn. Bighorn year-long crucial 38.56 Acres Operation DisturbanceBIG GAME 1217.01 Utah-Rocky Mtn. Elk winter crucial 58.41 Acres Construction DisturbanceBIG GAME 1217.01 Utah-Rocky Mtn. Elk winter crucial 12.31 Acres Operation DisturbanceBIG GAME 1217.02 Utah-Mule Deer winter crucial 0.97 Acres Construction DisturbanceBIG GAME 1217.02 Utah-Mule Deer winter crucial 0.21 Acres Operation DisturbanceBIG GAME 1217.02 Utah-Rocky Mtn. Elk winter crucial 107.20 Acres Construction DisturbanceBIG GAME 1217.02 Utah-Rocky Mtn. Elk winter crucial 35.19 Acres Operation DisturbanceBIG GAME 1217.051 Utah-Mule Deer winter crucial 87.30 Acres Construction DisturbanceBIG GAME 1217.051 Utah-Mule Deer winter crucial 23.52 Acres Operation DisturbanceBIG GAME 1217.051 Utah-Rocky Mtn. Elk winter crucial 101.24 Acres Construction DisturbanceBIG GAME 1217.051 Utah-Rocky Mtn. Elk winter crucial 24.81 Acres Operation DisturbanceBIG GAME 1217.052 Utah-Moose 45.52 Acres Construction DisturbanceBIG GAME 1217.052 Utah-Moose 21.53 Acres Operation DisturbanceBIG GAME 1217.052 Utah-Mule Deer winter crucial 174.66 Acres Construction DisturbanceBIG GAME 1217.052 Utah-Mule Deer winter crucial 55.69 Acres Operation DisturbanceBIG GAME 1217.052 Utah-Rocky Mtn. Elk winter crucial 163.01 Acres Construction DisturbanceBIG GAME 1217.052 Utah-Rocky Mtn. Elk winter crucial 58.21 Acres Operation DisturbanceBIG GAME 1217.1 Utah-Mule Deer winter crucial 183.39 Acres Construction DisturbanceBIG GAME 1217.1 Utah-Mule Deer winter crucial 54.70 Acres Operation DisturbanceBIG GAME 1217.1 Utah-Rocky Mtn. Elk winter crucial 102.45 Acres Construction DisturbanceBIG GAME 1217.1 Utah-Rocky Mtn. Elk winter crucial 34.19 Acres Operation DisturbanceBIG GAME 1217.15 Utah-Moose 230.77 Acres Construction DisturbanceBIG GAME 1217.15 Utah-Moose 79.05 Acres Operation DisturbanceBIG GAME 1217.15 Utah-Mule Deer winter crucial 113.03 Acres Construction DisturbanceBIG GAME 1217.15 Utah-Mule Deer winter crucial 43.75 Acres Operation DisturbanceBIG GAME 1217.15 Utah-Rocky Mtn. Elk winter crucial 254.31 Acres Construction Disturbance

Page 15: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

BIG GAME 1217.15 Utah-Rocky Mtn. Elk winter crucial 89.25 Acres Operation DisturbanceBIG GAME 1218 Utah-Mule Deer winter crucial 18.15 Acres Construction DisturbanceBIG GAME 1218 Utah-Mule Deer winter crucial 6.13 Acres Operation DisturbanceBIG GAME 1218 Utah-Rocky Mtn. Elk winter crucial 0.85 Acres Construction DisturbanceBIG GAME 1218 Utah-Rocky Mtn. Elk winter crucial 0.35 Acres Operation DisturbanceBIG GAME 1219.2 Utah-Rocky Mtn. Bighorn year-long crucial 0.04 Acres Construction DisturbanceBIG GAME 1219.2 Utah-Rocky Mtn. Bighorn year-long crucial 0.02 Acres Operation DisturbanceBIG GAME 1219.2 Utah-Rocky Mtn. Elk winter crucial 54.71 Acres Construction DisturbanceBIG GAME 1219.2 Utah-Rocky Mtn. Elk winter crucial 15.75 Acres Operation DisturbanceBIG GAME 1219.3 Utah-Mule Deer winter crucial 1.01 Acres Construction DisturbanceBIG GAME 1219.3 Utah-Mule Deer winter crucial 0.21 Acres Operation DisturbanceBIG GAME 1219.4 Utah-Rocky Mtn. Elk winter crucial 9.32 Acres Construction DisturbanceBIG GAME 1219.4 Utah-Rocky Mtn. Elk winter crucial 3.88 Acres Operation DisturbanceBIG GAME 1219.45 Utah-Rocky Mtn. Elk winter crucial 32.85 Acres Construction DisturbanceBIG GAME 1219.45 Utah-Rocky Mtn. Elk winter crucial 12.32 Acres Operation DisturbanceBIG GAME 1219.5 Utah-Mule Deer winter crucial 0.44 Acres Construction DisturbanceBIG GAME 1219.5 Utah-Mule Deer winter crucial 0.31 Acres Operation DisturbanceBIG GAME 1219.5 Utah-Rocky Mtn. Elk winter crucial 176.16 Acres Construction DisturbanceBIG GAME 1219.5 Utah-Rocky Mtn. Elk winter crucial 60.16 Acres Operation DisturbanceBIG GAME 1219.6 Utah-Rocky Mtn. Elk winter crucial 14.49 Acres Construction DisturbanceBIG GAME 1219.6 Utah-Rocky Mtn. Elk winter crucial 3.04 Acres Operation DisturbanceBIG GAME 1220 Colorado-Mule Deer-severe_winter 578.25 Acres Construction DisturbanceBIG GAME 1220 Colorado-Mule Deer-severe_winter 121.19 Acres Operation DisturbanceBIG GAME 1220 Colorado-Pronghorn-severe_winter 28.75 Acres Construction DisturbanceBIG GAME 1220 Colorado-Pronghorn-severe_winter 8.26 Acres Operation DisturbanceBIG GAME 1220 Colorado-Rocky Mtn. Elk-Severe Winter 185.06 Acres Construction DisturbanceBIG GAME 1220 Colorado-Rocky Mtn. Elk-Severe Winter 39.04 Acres Operation DisturbanceBIG GAME 1220 Utah-Desert Bighorn Sheep 113.33 Acres Construction DisturbanceBIG GAME 1220 Utah-Desert Bighorn Sheep 24.21 Acres Operation DisturbanceBIG GAME 1220 Utah-Mule Deer winter crucial 0.96 Acres Construction DisturbanceBIG GAME 1220 Utah-Mule Deer winter crucial 0.38 Acres Operation DisturbanceBIG GAME 1220 Utah-Pronghorn year-long substantial 119.10 Acres Construction DisturbanceBIG GAME 1220 Utah-Pronghorn year-long substantial 35.08 Acres Operation DisturbanceBIG GAME 1220 Utah-Rocky Mtn. Bighorn year-long crucial 2.37 Acres Construction DisturbanceBIG GAME 1220 Utah-Rocky Mtn. Bighorn year-long crucial 0.93 Acres Operation DisturbanceBIG GAME 1222.05 Utah-Pronghorn year-long substantial 202.18 Acres Construction DisturbanceBIG GAME 1222.05 Utah-Pronghorn year-long substantial 33.83 Acres Operation DisturbanceBIG GAME 1222.05 Utah-Rocky Mtn. Elk winter crucial 25.63 Acres Construction DisturbanceBIG GAME 1222.05 Utah-Rocky Mtn. Elk winter crucial 4.60 Acres Operation DisturbanceBIG GAME 1222.3 Utah-Mule Deer winter crucial 198.21 Acres Construction DisturbanceBIG GAME 1222.3 Utah-Mule Deer winter crucial 49.33 Acres Operation DisturbanceBIG GAME 1222.3 Utah-Pronghorn year-long substantial 0.28 Acres Construction DisturbanceBIG GAME 1222.3 Utah-Pronghorn year-long substantial 0.12 Acres Operation DisturbanceBIG GAME 1222.3 Utah-Rocky Mtn. Elk winter crucial 189.88 Acres Construction DisturbanceBIG GAME 1222.3 Utah-Rocky Mtn. Elk winter crucial 48.31 Acres Operation Disturbance

Page 16: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

BIG GAME 1223 Utah-Mule Deer winter crucial 251.65 Acres Construction DisturbanceBIG GAME 1223 Utah-Mule Deer winter crucial 62.09 Acres Operation DisturbanceBIG GAME 1223 Utah-Pronghorn year-long substantial 0.02 Acres Construction DisturbanceBIG GAME 1223 Utah-Pronghorn year-long substantial 0.00 Acres Operation DisturbanceBIG GAME 1223 Utah-Rocky Mtn. Elk winter crucial 263.02 Acres Construction DisturbanceBIG GAME 1223 Utah-Rocky Mtn. Elk winter crucial 66.18 Acres Operation DisturbanceBIG GAME 1225.2 Utah-Desert Bighorn Sheep 3.48 Acres Construction DisturbanceBIG GAME 1225.2 Utah-Desert Bighorn Sheep 1.20 Acres Operation DisturbanceBIG GAME 1225.2 Utah-Pronghorn year-long substantial 307.23 Acres Construction DisturbanceBIG GAME 1225.2 Utah-Pronghorn year-long substantial 59.58 Acres Operation DisturbanceBIG GAME 1270 Utah-Mule Deer winter crucial 30.47 Acres Construction DisturbanceBIG GAME 1270 Utah-Mule Deer winter crucial 5.84 Acres Operation DisturbanceBIG GAME 1310 Utah-Moose 183.32 Acres Construction DisturbanceBIG GAME 1310 Utah-Moose 65.51 Acres Operation DisturbanceBIG GAME 1310 Utah-Mule Deer winter crucial 366.69 Acres Construction DisturbanceBIG GAME 1310 Utah-Mule Deer winter crucial 128.69 Acres Operation DisturbanceBIG GAME 1310 Utah-Rocky Mtn. Elk winter crucial 201.24 Acres Construction DisturbanceBIG GAME 1310 Utah-Rocky Mtn. Elk winter crucial 78.68 Acres Operation DisturbanceBIG GAME 1320.05 Utah-Pronghorn year-long substantial 77.90 Acres Construction DisturbanceBIG GAME 1320.05 Utah-Pronghorn year-long substantial 14.13 Acres Operation DisturbanceBIG GAME 1320.05 Utah-Rocky Mtn. Elk winter crucial 1.79 Acres Construction DisturbanceBIG GAME 1320.05 Utah-Rocky Mtn. Elk winter crucial 0.57 Acres Operation DisturbanceBIG GAME 1320.05 UT-Mule Deer-Yearlong-Crucial 24.93 Acres Construction DisturbanceBIG GAME 1320.05 UT-Mule Deer-Yearlong-Crucial 4.75 Acres Operation DisturbanceBIG GAME 1320.05 UT-Mule Deer-Yearlong-Substantial 259.60 Acres Construction DisturbanceBIG GAME 1320.05 UT-Mule Deer-Yearlong-Substantial 42.15 Acres Operation DisturbanceBIG GAME 1320.05 UT-Pronghorn-Yearlong-Crucial/Parturition 154.73 Acres Construction DisturbanceBIG GAME 1320.05 UT-Pronghorn-Yearlong-Crucial/Parturition 26.95 Acres Operation DisturbanceBIG GAME 1320.05 UT-Pronghorn-Yearlong-Substantial 77.90 Acres Construction DisturbanceBIG GAME 1320.05 UT-Pronghorn-Yearlong-Substantial 14.13 Acres Operation DisturbanceBIG GAME 1320.05 UT-Rocky Mountain Elk-Winter-Crucial 1.79 Acres Construction DisturbanceBIG GAME 1320.05 UT-Rocky Mountain Elk-Winter-Crucial 0.57 Acres Operation DisturbanceBIG GAME 1320.15 Utah-Moose 481.46 Acres Construction DisturbanceBIG GAME 1320.15 Utah-Moose 183.69 Acres Operation DisturbanceBIG GAME 1320.15 Utah-Mule Deer winter crucial 134.69 Acres Construction DisturbanceBIG GAME 1320.15 Utah-Mule Deer winter crucial 60.01 Acres Operation DisturbanceBIG GAME 1320.15 Utah-Rocky Mtn. Elk winter crucial 408.94 Acres Construction DisturbanceBIG GAME 1320.15 Utah-Rocky Mtn. Elk winter crucial 155.11 Acres Operation DisturbanceBIG GAME 1320.15 UT-Black Bear-Yearlong-Crucial 81.50 Acres Construction DisturbanceBIG GAME 1320.15 UT-Black Bear-Yearlong-Crucial 29.81 Acres Operation DisturbanceBIG GAME 1320.15 UT-Black Bear-Yearlong-Substantial 0.00 Acres Construction DisturbanceBIG GAME 1320.15 UT-Black Bear-Yearlong-Substantial 0.00 Acres Operation DisturbanceBIG GAME 1320.15 UT-Moose-Winter-Substantial 15.43 Acres Construction DisturbanceBIG GAME 1320.15 UT-Moose-Winter-Substantial 10.95 Acres Operation DisturbanceBIG GAME 1320.15 UT-Moose-Yearlong-Substantial 481.46 Acres Construction Disturbance

Page 17: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

BIG GAME 1320.15 UT-Moose-Yearlong-Substantial 183.69 Acres Operation DisturbanceBIG GAME 1320.15 UT-Mule Deer-Spring/Fall-Crucial 70.78 Acres Construction DisturbanceBIG GAME 1320.15 UT-Mule Deer-Spring/Fall-Crucial 26.45 Acres Operation DisturbanceBIG GAME 1320.15 UT-Mule Deer-Winter/Spring-Crucial 260.72 Acres Construction DisturbanceBIG GAME 1320.15 UT-Mule Deer-Winter/Spring-Crucial 96.12 Acres Operation DisturbanceBIG GAME 1320.15 UT-Mule Deer-Winter-Crucial 134.69 Acres Construction DisturbanceBIG GAME 1320.15 UT-Mule Deer-Winter-Crucial 60.01 Acres Operation DisturbanceBIG GAME 1320.15 UT-Rocky Mountain Elk-Spring/Fall-Crucial 34.68 Acres Construction DisturbanceBIG GAME 1320.15 UT-Rocky Mountain Elk-Spring/Fall-Crucial 12.78 Acres Operation DisturbanceBIG GAME 1320.15 UT-Rocky Mountain Elk-Spring/Fall-Substantial 4.69 Acres Construction DisturbanceBIG GAME 1320.15 UT-Rocky Mountain Elk-Spring/Fall-Substantial 3.20 Acres Operation DisturbanceBIG GAME 1320.15 UT-Rocky Mountain Elk-Winter-Crucial 408.94 Acres Construction DisturbanceBIG GAME 1320.15 UT-Rocky Mountain Elk-Winter-Crucial 155.11 Acres Operation DisturbanceBIG GAME 1320.2 Utah-Moose 119.97 Acres Construction DisturbanceBIG GAME 1320.2 Utah-Moose 45.56 Acres Operation DisturbanceBIG GAME 1320.2 Utah-Mule Deer winter crucial 88.49 Acres Construction DisturbanceBIG GAME 1320.2 Utah-Mule Deer winter crucial 33.44 Acres Operation DisturbanceBIG GAME 1320.2 Utah-Rocky Mtn. Elk winter crucial 110.61 Acres Construction DisturbanceBIG GAME 1320.2 Utah-Rocky Mtn. Elk winter crucial 42.06 Acres Operation DisturbanceBIG GAME 1320.2 UT-Black Bear-Yearlong-Crucial 47.23 Acres Construction DisturbanceBIG GAME 1320.2 UT-Black Bear-Yearlong-Crucial 18.42 Acres Operation DisturbanceBIG GAME 1320.2 UT-Moose-Yearlong-Substantial 119.97 Acres Construction DisturbanceBIG GAME 1320.2 UT-Moose-Yearlong-Substantial 45.56 Acres Operation DisturbanceBIG GAME 1320.2 UT-Mule Deer-Winter/Spring-Crucial 24.89 Acres Construction DisturbanceBIG GAME 1320.2 UT-Mule Deer-Winter/Spring-Crucial 9.76 Acres Operation DisturbanceBIG GAME 1320.2 UT-Mule Deer-Winter-Crucial 88.51 Acres Construction DisturbanceBIG GAME 1320.2 UT-Mule Deer-Winter-Crucial 33.45 Acres Operation DisturbanceBIG GAME 1320.2 UT-Rocky Mountain Bighorn Sheep-Yearlong-Substantial 2.02 Acres Construction DisturbanceBIG GAME 1320.2 UT-Rocky Mountain Bighorn Sheep-Yearlong-Substantial 1.44 Acres Operation DisturbanceBIG GAME 1320.2 UT-Rocky Mountain Elk-Winter-Crucial 110.60 Acres Construction DisturbanceBIG GAME 1320.2 UT-Rocky Mountain Elk-Winter-Crucial 42.06 Acres Operation DisturbanceBIG GAME 1320.21 Utah-Moose 5.61 Acres Construction DisturbanceBIG GAME 1320.21 Utah-Moose 2.16 Acres Operation DisturbanceBIG GAME 1320.21 Utah-Mule Deer winter crucial 1.03 Acres Construction DisturbanceBIG GAME 1320.21 Utah-Mule Deer winter crucial 0.59 Acres Operation DisturbanceBIG GAME 1320.21 Utah-Rocky Mtn. Elk winter crucial 3.76 Acres Construction DisturbanceBIG GAME 1320.21 Utah-Rocky Mtn. Elk winter crucial 1.55 Acres Operation DisturbanceBIG GAME 1320.21 UT-Black Bear-Yearlong-Crucial 5.61 Acres Construction DisturbanceBIG GAME 1320.21 UT-Black Bear-Yearlong-Crucial 2.16 Acres Operation DisturbanceBIG GAME 1320.21 UT-Moose-Yearlong-Substantial 5.61 Acres Construction DisturbanceBIG GAME 1320.21 UT-Moose-Yearlong-Substantial 2.16 Acres Operation DisturbanceBIG GAME 1320.21 UT-Mule Deer-Winter/Spring-Crucial 3.80 Acres Construction DisturbanceBIG GAME 1320.21 UT-Mule Deer-Winter/Spring-Crucial 1.32 Acres Operation DisturbanceBIG GAME 1320.21 UT-Mule Deer-Winter-Crucial 1.03 Acres Construction DisturbanceBIG GAME 1320.21 UT-Mule Deer-Winter-Crucial 0.59 Acres Operation Disturbance

Page 18: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

BIG GAME 1320.21 UT-Rocky Mountain Bighorn Sheep-Yearlong-Substantial 0.40 Acres Construction DisturbanceBIG GAME 1320.21 UT-Rocky Mountain Bighorn Sheep-Yearlong-Substantial 0.29 Acres Operation DisturbanceBIG GAME 1320.21 UT-Rocky Mountain Elk-Winter-Crucial 3.76 Acres Construction DisturbanceBIG GAME 1320.21 UT-Rocky Mountain Elk-Winter-Crucial 1.55 Acres Operation DisturbanceBIG GAME 1321 Utah-Mule Deer winter crucial 218.03 Acres Construction DisturbanceBIG GAME 1321 Utah-Mule Deer winter crucial 43.72 Acres Operation DisturbanceBIG GAME 1321 Utah-Rocky Mtn. Elk winter crucial 219.42 Acres Construction DisturbanceBIG GAME 1321 Utah-Rocky Mtn. Elk winter crucial 43.40 Acres Operation DisturbanceBIG GAME 1321.01 UT-Black Bear-Yearlong-Substantial 96.49 Acres Construction DisturbanceBIG GAME 1321.01 UT-Black Bear-Yearlong-Substantial 19.43 Acres Operation DisturbanceBIG GAME 1321.01 UT-Mule Deer-Winter-Crucial 204.41 Acres Construction DisturbanceBIG GAME 1321.01 UT-Mule Deer-Winter-Crucial 41.71 Acres Operation DisturbanceBIG GAME 1321.01 UT-Mule Deer-Yearlong-Crucial 22.82 Acres Construction DisturbanceBIG GAME 1321.01 UT-Mule Deer-Yearlong-Crucial 4.00 Acres Operation DisturbanceBIG GAME 1321.01 UT-Mule Deer-Yearlong-Substantial 88.43 Acres Construction DisturbanceBIG GAME 1321.01 UT-Mule Deer-Yearlong-Substantial 11.93 Acres Operation DisturbanceBIG GAME 1321.01 UT-Rocky Mountain Elk-Winter-Crucial 205.78 Acres Construction DisturbanceBIG GAME 1321.01 UT-Rocky Mountain Elk-Winter-Crucial 41.39 Acres Operation DisturbanceBIG GAME 1321.01 UT-Rocky Mountain Elk-Winter-Substantial 39.14 Acres Construction DisturbanceBIG GAME 1321.01 UT-Rocky Mountain Elk-Winter-Substantial 8.20 Acres Operation DisturbanceBIG GAME 1321.02 UT-Black Bear-Yearlong-Substantial 16.13 Acres Construction DisturbanceBIG GAME 1321.02 UT-Black Bear-Yearlong-Substantial 1.61 Acres Operation DisturbanceBIG GAME 1321.02 UT-Mule Deer-Winter-Crucial 16.13 Acres Construction DisturbanceBIG GAME 1321.02 UT-Mule Deer-Winter-Crucial 1.61 Acres Operation DisturbanceBIG GAME 1321.02 UT-Rocky Mountain Elk-Winter-Crucial 16.13 Acres Construction DisturbanceBIG GAME 1321.02 UT-Rocky Mountain Elk-Winter-Crucial 1.61 Acres Operation DisturbanceBIG GAME 1322 Utah-Mule Deer winter crucial 73.46 Acres Construction DisturbanceBIG GAME 1322 Utah-Mule Deer winter crucial 14.43 Acres Operation DisturbanceBIG GAME 1322 Utah-Rocky Mtn. Elk winter crucial 76.95 Acres Construction DisturbanceBIG GAME 1322 Utah-Rocky Mtn. Elk winter crucial 15.12 Acres Operation DisturbanceBIG GAME 1322.01 UT-Black Bear-Yearlong-Substantial 20.18 Acres Construction DisturbanceBIG GAME 1322.01 UT-Black Bear-Yearlong-Substantial 3.04 Acres Operation DisturbanceBIG GAME 1322.01 UT-Mule Deer-Winter-Crucial 20.18 Acres Construction DisturbanceBIG GAME 1322.01 UT-Mule Deer-Winter-Crucial 3.04 Acres Operation DisturbanceBIG GAME 1322.01 UT-Rocky Mountain Elk-Winter-Crucial 20.18 Acres Construction DisturbanceBIG GAME 1322.01 UT-Rocky Mountain Elk-Winter-Crucial 3.04 Acres Operation DisturbanceBIG GAME 1322.02 UT-Black Bear-Yearlong-Substantial 58.27 Acres Construction DisturbanceBIG GAME 1322.02 UT-Black Bear-Yearlong-Substantial 12.24 Acres Operation DisturbanceBIG GAME 1322.02 UT-Moose-Winter-Crucial 5.61 Acres Construction DisturbanceBIG GAME 1322.02 UT-Moose-Winter-Crucial 1.18 Acres Operation DisturbanceBIG GAME 1322.02 UT-Mule Deer-Winter-Crucial 58.27 Acres Construction DisturbanceBIG GAME 1322.02 UT-Mule Deer-Winter-Crucial 12.24 Acres Operation DisturbanceBIG GAME 1322.02 UT-Rocky Mountain Elk-Winter-Crucial 58.27 Acres Construction DisturbanceBIG GAME 1322.02 UT-Rocky Mountain Elk-Winter-Crucial 12.24 Acres Operation DisturbanceBIG GAME 1322.11 UT-Black Bear-Yearlong-Substantial 41.97 Acres Construction Disturbance

Page 19: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

BIG GAME 1322.11 UT-Black Bear-Yearlong-Substantial 6.48 Acres Operation DisturbanceBIG GAME 1322.11 UT-Mule Deer-Winter-Crucial 41.97 Acres Construction DisturbanceBIG GAME 1322.11 UT-Mule Deer-Winter-Crucial 6.48 Acres Operation DisturbanceBIG GAME 1322.11 UT-Rocky Mountain Elk-Winter-Crucial 41.97 Acres Construction DisturbanceBIG GAME 1322.11 UT-Rocky Mountain Elk-Winter-Crucial 6.48 Acres Operation DisturbanceBIG GAME 1322.12 UT-Black Bear-Yearlong-Substantial 25.86 Acres Construction DisturbanceBIG GAME 1322.12 UT-Black Bear-Yearlong-Substantial 3.52 Acres Operation DisturbanceBIG GAME 1322.12 UT-Moose-Winter-Crucial 25.74 Acres Construction DisturbanceBIG GAME 1322.12 UT-Moose-Winter-Crucial 3.50 Acres Operation DisturbanceBIG GAME 1322.12 UT-Mule Deer-Winter-Crucial 7.40 Acres Construction DisturbanceBIG GAME 1322.12 UT-Mule Deer-Winter-Crucial 1.01 Acres Operation DisturbanceBIG GAME 1322.12 UT-Mule Deer-Yearlong-Substantial 18.46 Acres Construction DisturbanceBIG GAME 1322.12 UT-Mule Deer-Yearlong-Substantial 2.51 Acres Operation DisturbanceBIG GAME 1322.12 UT-Rocky Mountain Elk-Winter-Crucial 10.87 Acres Construction DisturbanceBIG GAME 1322.12 UT-Rocky Mountain Elk-Winter-Crucial 1.48 Acres Operation DisturbanceBIG GAME 1322.12 UT-Rocky Mountain Elk-Winter-Substantial 14.98 Acres Construction DisturbanceBIG GAME 1322.12 UT-Rocky Mountain Elk-Winter-Substantial 2.04 Acres Operation DisturbanceBIG GAME 1322.21 UT-Black Bear-Yearlong-Substantial 23.49 Acres Construction DisturbanceBIG GAME 1322.21 UT-Black Bear-Yearlong-Substantial 5.78 Acres Operation DisturbanceBIG GAME 1322.21 UT-Moose-Winter-Crucial 21.79 Acres Construction DisturbanceBIG GAME 1322.21 UT-Moose-Winter-Crucial 5.36 Acres Operation DisturbanceBIG GAME 1322.21 UT-Mule Deer-Winter-Crucial 14.67 Acres Construction DisturbanceBIG GAME 1322.21 UT-Mule Deer-Winter-Crucial 3.61 Acres Operation DisturbanceBIG GAME 1322.21 UT-Mule Deer-Yearlong-Substantial 8.81 Acres Construction DisturbanceBIG GAME 1322.21 UT-Mule Deer-Yearlong-Substantial 2.17 Acres Operation DisturbanceBIG GAME 1322.21 UT-Rocky Mountain Elk-Winter-Crucial 15.09 Acres Construction DisturbanceBIG GAME 1322.21 UT-Rocky Mountain Elk-Winter-Crucial 3.71 Acres Operation DisturbanceBIG GAME 1322.21 UT-Rocky Mountain Elk-Winter-Substantial 8.39 Acres Construction DisturbanceBIG GAME 1322.21 UT-Rocky Mountain Elk-Winter-Substantial 2.06 Acres Operation DisturbanceBIG GAME 1322.22 UT-Black Bear-Yearlong-Substantial 56.46 Acres Construction DisturbanceBIG GAME 1322.22 UT-Black Bear-Yearlong-Substantial 7.65 Acres Operation DisturbanceBIG GAME 1322.22 UT-Moose-Winter-Crucial 56.46 Acres Construction DisturbanceBIG GAME 1322.22 UT-Moose-Winter-Crucial 7.65 Acres Operation DisturbanceBIG GAME 1322.22 UT-Mule Deer-Winter-Crucial 55.78 Acres Construction DisturbanceBIG GAME 1322.22 UT-Mule Deer-Winter-Crucial 7.56 Acres Operation DisturbanceBIG GAME 1322.22 UT-Mule Deer-Yearlong-Substantial 0.68 Acres Construction DisturbanceBIG GAME 1322.22 UT-Mule Deer-Yearlong-Substantial 0.09 Acres Operation DisturbanceBIG GAME 1322.22 UT-Rocky Mountain Elk-Winter-Crucial 7.65 Acres Construction DisturbanceBIG GAME 1322.22 UT-Rocky Mountain Elk-Winter-Crucial 1.04 Acres Operation DisturbanceBIG GAME 1322.22 UT-Rocky Mountain Elk-Winter-Substantial 48.82 Acres Construction DisturbanceBIG GAME 1322.22 UT-Rocky Mountain Elk-Winter-Substantial 6.61 Acres Operation DisturbanceBIG GAME 1322.23 UT-Black Bear-Yearlong-Substantial 28.73 Acres Construction DisturbanceBIG GAME 1322.23 UT-Black Bear-Yearlong-Substantial 5.45 Acres Operation DisturbanceBIG GAME 1322.23 UT-Moose-Winter-Crucial 28.73 Acres Construction DisturbanceBIG GAME 1322.23 UT-Moose-Winter-Crucial 5.45 Acres Operation Disturbance

Page 20: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

BIG GAME 1322.23 UT-Mule Deer-Summer-Crucial 0.35 Acres Construction DisturbanceBIG GAME 1322.23 UT-Mule Deer-Summer-Crucial 0.21 Acres Operation DisturbanceBIG GAME 1322.23 UT-Mule Deer-Winter-Crucial 11.86 Acres Construction DisturbanceBIG GAME 1322.23 UT-Mule Deer-Winter-Crucial 3.46 Acres Operation DisturbanceBIG GAME 1322.23 UT-Mule Deer-Yearlong-Substantial 16.52 Acres Construction DisturbanceBIG GAME 1322.23 UT-Mule Deer-Yearlong-Substantial 1.78 Acres Operation DisturbanceBIG GAME 1322.23 UT-Rocky Mountain Elk-Winter-Crucial 5.08 Acres Construction DisturbanceBIG GAME 1322.23 UT-Rocky Mountain Elk-Winter-Crucial 1.44 Acres Operation DisturbanceBIG GAME 1322.23 UT-Rocky Mountain Elk-Winter-Substantial 9.00 Acres Construction DisturbanceBIG GAME 1322.23 UT-Rocky Mountain Elk-Winter-Substantial 0.93 Acres Operation DisturbanceBIG GAME 1322.23 UT-Rocky Mountain Elk-Yearlong-Crucial/Parturition 14.65 Acres Construction DisturbanceBIG GAME 1322.23 UT-Rocky Mountain Elk-Yearlong-Crucial/Parturition 3.08 Acres Operation DisturbanceBIG GAME 1322.5 Utah-Mule Deer winter crucial 94.27 Acres Construction DisturbanceBIG GAME 1322.5 Utah-Mule Deer winter crucial 20.42 Acres Operation DisturbanceBIG GAME 1322.5 Utah-Rocky Mtn. Elk winter crucial 98.72 Acres Construction DisturbanceBIG GAME 1322.5 Utah-Rocky Mtn. Elk winter crucial 21.40 Acres Operation DisturbanceBIG GAME 1322.51 UT-Black Bear-Yearlong-Substantial 73.94 Acres Construction DisturbanceBIG GAME 1322.51 UT-Black Bear-Yearlong-Substantial 12.12 Acres Operation DisturbanceBIG GAME 1322.51 UT-Moose-Winter-Crucial 1.98 Acres Construction DisturbanceBIG GAME 1322.51 UT-Moose-Winter-Crucial 0.32 Acres Operation DisturbanceBIG GAME 1322.51 UT-Mule Deer-Winter-Crucial 71.98 Acres Construction DisturbanceBIG GAME 1322.51 UT-Mule Deer-Winter-Crucial 11.80 Acres Operation DisturbanceBIG GAME 1322.51 UT-Mule Deer-Yearlong-Substantial 1.96 Acres Construction DisturbanceBIG GAME 1322.51 UT-Mule Deer-Yearlong-Substantial 0.32 Acres Operation DisturbanceBIG GAME 1322.51 UT-Rocky Mountain Elk-Winter-Crucial 73.94 Acres Construction DisturbanceBIG GAME 1322.51 UT-Rocky Mountain Elk-Winter-Crucial 12.12 Acres Operation DisturbanceBIG GAME 1322.52 UT-Black Bear-Yearlong-Substantial 11.14 Acres Construction DisturbanceBIG GAME 1322.52 UT-Black Bear-Yearlong-Substantial 2.34 Acres Operation DisturbanceBIG GAME 1322.52 UT-Moose-Winter-Crucial 0.41 Acres Construction DisturbanceBIG GAME 1322.52 UT-Moose-Winter-Crucial 0.09 Acres Operation DisturbanceBIG GAME 1322.52 UT-Mule Deer-Winter-Crucial 10.76 Acres Construction DisturbanceBIG GAME 1322.52 UT-Mule Deer-Winter-Crucial 2.27 Acres Operation DisturbanceBIG GAME 1322.52 UT-Mule Deer-Yearlong-Substantial 0.38 Acres Construction DisturbanceBIG GAME 1322.52 UT-Mule Deer-Yearlong-Substantial 0.08 Acres Operation DisturbanceBIG GAME 1322.52 UT-Rocky Mountain Elk-Winter-Crucial 11.14 Acres Construction DisturbanceBIG GAME 1322.52 UT-Rocky Mountain Elk-Winter-Crucial 2.34 Acres Operation DisturbanceBIG GAME 1322.53 UT-Black Bear-Yearlong-Substantial 25.26 Acres Construction DisturbanceBIG GAME 1322.53 UT-Black Bear-Yearlong-Substantial 6.72 Acres Operation DisturbanceBIG GAME 1322.53 UT-Moose-Winter-Crucial 19.97 Acres Construction DisturbanceBIG GAME 1322.53 UT-Moose-Winter-Crucial 5.31 Acres Operation DisturbanceBIG GAME 1322.53 UT-Mule Deer-Winter-Crucial 13.20 Acres Construction DisturbanceBIG GAME 1322.53 UT-Mule Deer-Winter-Crucial 3.51 Acres Operation DisturbanceBIG GAME 1322.53 UT-Mule Deer-Yearlong-Substantial 12.07 Acres Construction DisturbanceBIG GAME 1322.53 UT-Mule Deer-Yearlong-Substantial 3.21 Acres Operation DisturbanceBIG GAME 1322.53 UT-Rocky Mountain Elk-Winter-Crucial 24.78 Acres Construction Disturbance

Page 21: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

BIG GAME 1322.53 UT-Rocky Mountain Elk-Winter-Crucial 6.59 Acres Operation DisturbanceBIG GAME 1322.53 UT-Rocky Mountain Elk-Winter-Substantial 0.49 Acres Construction DisturbanceBIG GAME 1322.53 UT-Rocky Mountain Elk-Winter-Substantial 0.13 Acres Operation DisturbanceBIG GAME 1322.71 UT-Black Bear-Yearlong-Substantial 205.96 Acres Construction DisturbanceBIG GAME 1322.71 UT-Black Bear-Yearlong-Substantial 57.88 Acres Operation DisturbanceBIG GAME 1322.71 UT-Moose-Winter-Crucial 120.07 Acres Construction DisturbanceBIG GAME 1322.71 UT-Moose-Winter-Crucial 33.61 Acres Operation DisturbanceBIG GAME 1322.71 UT-Mule Deer-Winter-Crucial 165.19 Acres Construction DisturbanceBIG GAME 1322.71 UT-Mule Deer-Winter-Crucial 46.43 Acres Operation DisturbanceBIG GAME 1322.71 UT-Mule Deer-Yearlong-Substantial 40.78 Acres Construction DisturbanceBIG GAME 1322.71 UT-Mule Deer-Yearlong-Substantial 11.45 Acres Operation DisturbanceBIG GAME 1322.71 UT-Rocky Mountain Elk-Winter-Crucial 161.23 Acres Construction DisturbanceBIG GAME 1322.71 UT-Rocky Mountain Elk-Winter-Crucial 45.38 Acres Operation DisturbanceBIG GAME 1322.71 UT-Rocky Mountain Elk-Winter-Substantial 44.73 Acres Construction DisturbanceBIG GAME 1322.71 UT-Rocky Mountain Elk-Winter-Substantial 12.49 Acres Operation DisturbanceBIG GAME 1323 Utah-Mule Deer winter crucial 85.85 Acres Construction DisturbanceBIG GAME 1323 Utah-Mule Deer winter crucial 34.40 Acres Operation DisturbanceBIG GAME 1323 Utah-Rocky Mtn. Bighorn year-long crucial 19.12 Acres Construction DisturbanceBIG GAME 1323 Utah-Rocky Mtn. Bighorn year-long crucial 10.47 Acres Operation DisturbanceBIG GAME 1323 Utah-Rocky Mtn. Elk winter crucial 26.13 Acres Construction DisturbanceBIG GAME 1323 Utah-Rocky Mtn. Elk winter crucial 9.51 Acres Operation DisturbanceBIG GAME 1323.01 UT-Black Bear-Yearlong-Substantial 93.74 Acres Construction DisturbanceBIG GAME 1323.01 UT-Black Bear-Yearlong-Substantial 24.28 Acres Operation DisturbanceBIG GAME 1323.01 UT-Moose-Winter-Crucial 93.74 Acres Construction DisturbanceBIG GAME 1323.01 UT-Moose-Winter-Crucial 24.28 Acres Operation DisturbanceBIG GAME 1323.01 UT-Mule Deer-Winter-Crucial 74.70 Acres Construction DisturbanceBIG GAME 1323.01 UT-Mule Deer-Winter-Crucial 19.15 Acres Operation DisturbanceBIG GAME 1323.01 UT-Mule Deer-Yearlong-Substantial 19.04 Acres Construction DisturbanceBIG GAME 1323.01 UT-Mule Deer-Yearlong-Substantial 5.13 Acres Operation DisturbanceBIG GAME 1323.01 UT-Rocky Mountain Elk-Winter-Crucial 25.13 Acres Construction DisturbanceBIG GAME 1323.01 UT-Rocky Mountain Elk-Winter-Crucial 6.66 Acres Operation DisturbanceBIG GAME 1323.01 UT-Rocky Mountain Elk-Winter-Substantial 53.87 Acres Construction DisturbanceBIG GAME 1323.01 UT-Rocky Mountain Elk-Winter-Substantial 13.61 Acres Operation DisturbanceBIG GAME 1323.01 UT-Rocky Mountain Elk-Yearlong-Crucial/Parturition 14.74 Acres Construction DisturbanceBIG GAME 1323.01 UT-Rocky Mountain Elk-Yearlong-Crucial/Parturition 4.02 Acres Operation DisturbanceBIG GAME 1323.02 UT-Black Bear-Yearlong-Substantial 242.48 Acres Construction DisturbanceBIG GAME 1323.02 UT-Black Bear-Yearlong-Substantial 83.07 Acres Operation DisturbanceBIG GAME 1323.02 UT-Moose-Spring/Fall-Crucial 97.90 Acres Construction DisturbanceBIG GAME 1323.02 UT-Moose-Spring/Fall-Crucial 30.07 Acres Operation DisturbanceBIG GAME 1323.02 UT-Moose-Winter-Crucial 144.59 Acres Construction DisturbanceBIG GAME 1323.02 UT-Moose-Winter-Crucial 53.01 Acres Operation DisturbanceBIG GAME 1323.02 UT-Mule Deer-Summer/Fall-Substantial 0.16 Acres Construction DisturbanceBIG GAME 1323.02 UT-Mule Deer-Summer/Fall-Substantial 0.10 Acres Operation DisturbanceBIG GAME 1323.02 UT-Mule Deer-Summer-Crucial 185.77 Acres Construction DisturbanceBIG GAME 1323.02 UT-Mule Deer-Summer-Crucial 63.16 Acres Operation Disturbance

Page 22: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

BIG GAME 1323.02 UT-Mule Deer-Winter/Spring-Crucial 52.36 Acres Construction DisturbanceBIG GAME 1323.02 UT-Mule Deer-Winter/Spring-Crucial 18.48 Acres Operation DisturbanceBIG GAME 1323.02 UT-Mule Deer-Winter-Crucial 4.20 Acres Construction DisturbanceBIG GAME 1323.02 UT-Mule Deer-Winter-Crucial 1.32 Acres Operation DisturbanceBIG GAME 1323.02 UT-Rocky Mountain Bighorn Sheep-Yearlong-Crucial 20.36 Acres Construction DisturbanceBIG GAME 1323.02 UT-Rocky Mountain Bighorn Sheep-Yearlong-Crucial 11.62 Acres Operation DisturbanceBIG GAME 1323.02 UT-Rocky Mountain Elk-Spring/Fall-Crucial 84.70 Acres Construction DisturbanceBIG GAME 1323.02 UT-Rocky Mountain Elk-Spring/Fall-Crucial 27.19 Acres Operation DisturbanceBIG GAME 1323.02 UT-Rocky Mountain Elk-Summer-Crucial 114.14 Acres Construction DisturbanceBIG GAME 1323.02 UT-Rocky Mountain Elk-Summer-Crucial 37.70 Acres Operation DisturbanceBIG GAME 1323.02 UT-Rocky Mountain Elk-Yearlong-Crucial/Parturition 43.65 Acres Construction DisturbanceBIG GAME 1323.02 UT-Rocky Mountain Elk-Yearlong-Crucial/Parturition 18.18 Acres Operation DisturbanceBIG GAME 1324 UT-Black Bear-Yearlong-Substantial 80.58 Acres Construction DisturbanceBIG GAME 1324 UT-Black Bear-Yearlong-Substantial 32.89 Acres Operation DisturbanceBIG GAME 1324 UT-Moose-Spring/Fall-Crucial 80.58 Acres Construction DisturbanceBIG GAME 1324 UT-Moose-Spring/Fall-Crucial 32.89 Acres Operation DisturbanceBIG GAME 1324 UT-Mule Deer-Summer-Crucial 80.58 Acres Construction DisturbanceBIG GAME 1324 UT-Mule Deer-Summer-Crucial 32.89 Acres Operation DisturbanceBIG GAME 1324 UT-Rocky Mountain Elk-Spring/Fall-Crucial 80.58 Acres Construction DisturbanceBIG GAME 1324 UT-Rocky Mountain Elk-Spring/Fall-Crucial 32.89 Acres Operation DisturbanceBIG GAME 1325 Utah-Moose 2.03 Acres Construction DisturbanceBIG GAME 1325 Utah-Moose 0.74 Acres Operation DisturbanceBIG GAME 1325 Utah-Mule Deer winter crucial 30.70 Acres Construction DisturbanceBIG GAME 1325 Utah-Mule Deer winter crucial 14.29 Acres Operation DisturbanceBIG GAME 1325 Utah-Rocky Mtn. Elk winter crucial 75.22 Acres Construction DisturbanceBIG GAME 1325 Utah-Rocky Mtn. Elk winter crucial 31.92 Acres Operation DisturbanceBIG GAME 1325 UT-Black Bear-Yearlong-Substantial 78.72 Acres Construction DisturbanceBIG GAME 1325 UT-Black Bear-Yearlong-Substantial 30.38 Acres Operation DisturbanceBIG GAME 1325 UT-Moose-Spring/Fall-Crucial 41.86 Acres Construction DisturbanceBIG GAME 1325 UT-Moose-Spring/Fall-Crucial 16.17 Acres Operation DisturbanceBIG GAME 1325 UT-Moose-Winter-Substantial 114.85 Acres Construction DisturbanceBIG GAME 1325 UT-Moose-Winter-Substantial 47.41 Acres Operation DisturbanceBIG GAME 1325 UT-Moose-Yearlong-Substantial 2.03 Acres Construction DisturbanceBIG GAME 1325 UT-Moose-Yearlong-Substantial 0.74 Acres Operation DisturbanceBIG GAME 1325 UT-Mule Deer-Summer-Crucial 43.06 Acres Construction DisturbanceBIG GAME 1325 UT-Mule Deer-Summer-Crucial 16.63 Acres Operation DisturbanceBIG GAME 1325 UT-Mule Deer-Winter/Spring-Crucial 84.98 Acres Construction DisturbanceBIG GAME 1325 UT-Mule Deer-Winter/Spring-Crucial 33.40 Acres Operation DisturbanceBIG GAME 1325 UT-Mule Deer-Winter-Crucial 30.70 Acres Construction DisturbanceBIG GAME 1325 UT-Mule Deer-Winter-Crucial 14.29 Acres Operation DisturbanceBIG GAME 1325 UT-Rocky Mountain Elk-Spring/Fall-Crucial 76.93 Acres Construction DisturbanceBIG GAME 1325 UT-Rocky Mountain Elk-Spring/Fall-Crucial 29.69 Acres Operation DisturbanceBIG GAME 1325 UT-Rocky Mountain Elk-Spring/Fall-Substantial 2.86 Acres Construction DisturbanceBIG GAME 1325 UT-Rocky Mountain Elk-Spring/Fall-Substantial 1.12 Acres Operation DisturbanceBIG GAME 1325 UT-Rocky Mountain Elk-Winter-Crucial 75.22 Acres Construction Disturbance

Page 23: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

BIG GAME 1325 UT-Rocky Mountain Elk-Winter-Crucial 31.92 Acres Operation DisturbanceBIG GAME 1325.1 Utah-Mule Deer winter crucial 97.88 Acres Construction DisturbanceBIG GAME 1325.1 Utah-Mule Deer winter crucial 19.69 Acres Operation DisturbanceBIG GAME 1325.1 Utah-Pronghorn year-long substantial 142.15 Acres Construction DisturbanceBIG GAME 1325.1 Utah-Pronghorn year-long substantial 37.13 Acres Operation DisturbanceBIG GAME 1325.1 Utah-Rocky Mtn. Bighorn year-long crucial 0.12 Acres Construction DisturbanceBIG GAME 1325.1 Utah-Rocky Mtn. Bighorn year-long crucial 0.06 Acres Operation DisturbanceBIG GAME 1325.1 Utah-Rocky Mtn. Elk winter crucial 179.72 Acres Construction DisturbanceBIG GAME 1325.1 Utah-Rocky Mtn. Elk winter crucial 34.41 Acres Operation DisturbanceBIG GAME 1325.2 Utah-Rocky Mtn. Elk winter crucial 28.37 Acres Construction DisturbanceBIG GAME 1325.2 Utah-Rocky Mtn. Elk winter crucial 9.96 Acres Operation DisturbanceBIG GAME 1330.1 Utah-Moose 254.25 Acres Construction DisturbanceBIG GAME 1330.1 Utah-Moose 54.46 Acres Operation DisturbanceBIG GAME 1330.1 Utah-Mule Deer winter crucial 570.63 Acres Construction DisturbanceBIG GAME 1330.1 Utah-Mule Deer winter crucial 154.66 Acres Operation DisturbanceBIG GAME 1330.1 Utah-Rocky Mtn. Elk winter crucial 70.04 Acres Construction DisturbanceBIG GAME 1330.1 Utah-Rocky Mtn. Elk winter crucial 16.20 Acres Operation DisturbanceBIG GAME 1340 Utah-Moose 58.54 Acres Construction DisturbanceBIG GAME 1340 Utah-Moose 8.99 Acres Operation DisturbanceBIG GAME 1340 Utah-Mule Deer winter crucial 54.37 Acres Construction DisturbanceBIG GAME 1340 Utah-Mule Deer winter crucial 9.00 Acres Operation DisturbanceBIG GAME 1340 Utah-Rocky Mtn. Elk winter crucial 63.76 Acres Construction DisturbanceBIG GAME 1340 Utah-Rocky Mtn. Elk winter crucial 10.05 Acres Operation DisturbanceBIG GAME 1350 Utah-Moose 83.64 Acres Construction DisturbanceBIG GAME 1350 Utah-Moose 29.17 Acres Operation DisturbanceBIG GAME 1350 Utah-Mule Deer winter crucial 73.56 Acres Construction DisturbanceBIG GAME 1350 Utah-Mule Deer winter crucial 25.40 Acres Operation DisturbanceBIG GAME 1350 Utah-Rocky Mtn. Elk winter crucial 86.20 Acres Construction DisturbanceBIG GAME 1350 Utah-Rocky Mtn. Elk winter crucial 29.36 Acres Operation DisturbanceBIG GAME 1350 UT-Black Bear-Yearlong-Crucial 17.65 Acres Construction DisturbanceBIG GAME 1350 UT-Black Bear-Yearlong-Crucial 6.01 Acres Operation DisturbanceBIG GAME 1350 UT-Moose-Yearlong-Substantial 83.64 Acres Construction DisturbanceBIG GAME 1350 UT-Moose-Yearlong-Substantial 29.17 Acres Operation DisturbanceBIG GAME 1350 UT-Mule Deer-Winter/Spring-Crucial 115.39 Acres Construction DisturbanceBIG GAME 1350 UT-Mule Deer-Winter/Spring-Crucial 38.84 Acres Operation DisturbanceBIG GAME 1350 UT-Mule Deer-Winter-Crucial 73.56 Acres Construction DisturbanceBIG GAME 1350 UT-Mule Deer-Winter-Crucial 25.40 Acres Operation DisturbanceBIG GAME 1350 UT-Rocky Mountain Elk-Spring/Fall-Substantial 0.70 Acres Construction DisturbanceBIG GAME 1350 UT-Rocky Mountain Elk-Spring/Fall-Substantial 0.45 Acres Operation DisturbanceBIG GAME 1350 UT-Rocky Mountain Elk-Winter-Crucial 86.20 Acres Construction DisturbanceBIG GAME 1350 UT-Rocky Mountain Elk-Winter-Crucial 29.36 Acres Operation DisturbanceBIG GAME 1350 UT-Rocky Mountain Elk-Yearlong-Substantial 69.18 Acres Construction DisturbanceBIG GAME 1350 UT-Rocky Mountain Elk-Yearlong-Substantial 22.99 Acres Operation DisturbanceBIG GAME 1360 Utah-Pronghorn year-long crucial 77.93 Acres Construction DisturbanceBIG GAME 1360 Utah-Pronghorn year-long crucial 21.28 Acres Operation Disturbance

Page 24: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

BIG GAME 1360 UT-Mule Deer-Winter/Spring-Crucial 231.63 Acres Construction DisturbanceBIG GAME 1360 UT-Mule Deer-Winter/Spring-Crucial 49.00 Acres Operation DisturbanceBIG GAME 1360 UT-Pronghorn-Yearlong-Crucial 77.93 Acres Construction DisturbanceBIG GAME 1360 UT-Pronghorn-Yearlong-Crucial 21.28 Acres Operation DisturbanceBIG GAME 1360 UT-Rocky Mountain Elk-Yearlong-Substantial 95.82 Acres Construction DisturbanceBIG GAME 1360 UT-Rocky Mountain Elk-Yearlong-Substantial 20.65 Acres Operation DisturbanceBIG GAME 1380 Utah-Mule Deer winter crucial 15.07 Acres Construction DisturbanceBIG GAME 1380 Utah-Mule Deer winter crucial 3.68 Acres Operation DisturbanceBIG GAME 1390 Utah-Pronghorn year-long crucial 26.63 Acres Construction DisturbanceBIG GAME 1390 Utah-Pronghorn year-long crucial 4.53 Acres Operation DisturbanceBIG GAME 1400 Utah-Mule Deer winter crucial 268.20 Acres Construction DisturbanceBIG GAME 1400 Utah-Mule Deer winter crucial 59.15 Acres Operation DisturbanceBIG GAME 1410 Utah-Mule Deer winter crucial 153.98 Acres Construction DisturbanceBIG GAME 1410 Utah-Mule Deer winter crucial 27.67 Acres Operation DisturbanceBIG GAME 1420 Utah-Pronghorn year-long crucial 3.00 Acres Construction DisturbanceBIG GAME 1420 Utah-Pronghorn year-long crucial 1.10 Acres Operation DisturbanceBIG GAME 1430 Utah-Pronghorn year-long crucial 109.33 Acres Construction DisturbanceBIG GAME 1430 Utah-Pronghorn year-long crucial 21.97 Acres Operation DisturbanceBIG GAME 1430 UT-Pronghorn-Yearlong-Crucial 109.33 Acres Construction DisturbanceBIG GAME 1430 UT-Pronghorn-Yearlong-Crucial 21.97 Acres Operation DisturbanceBIG GAME 1450 Utah-Pronghorn year-long crucial 49.50 Acres Construction DisturbanceBIG GAME 1450 Utah-Pronghorn year-long crucial 7.28 Acres Operation DisturbanceBIG GAME 1460 Utah-Pronghorn year-long crucial 386.32 Acres Construction DisturbanceBIG GAME 1460 Utah-Pronghorn year-long crucial 58.43 Acres Operation DisturbanceBIG GAME 1470 Utah-Pronghorn year-long crucial 429.91 Acres Construction DisturbanceBIG GAME 1470 Utah-Pronghorn year-long crucial 90.33 Acres Operation DisturbanceBIG GAME 1480 Utah-Pronghorn year-long crucial 682.42 Acres Construction DisturbanceBIG GAME 1480 Utah-Pronghorn year-long crucial 115.14 Acres Operation DisturbanceBIG GAME 1490 Utah-Pronghorn year-long crucial 166.37 Acres Construction DisturbanceBIG GAME 1490 Utah-Pronghorn year-long crucial 34.07 Acres Operation DisturbanceBIG GAME 1490.05 Nevada-Mule Deer 20.96 Acres Construction DisturbanceBIG GAME 1490.05 Nevada-Mule Deer 4.08 Acres Operation DisturbanceBIG GAME 1490.05 Utah-Mule Deer winter crucial 0.28 Acres Construction DisturbanceBIG GAME 1490.05 Utah-Mule Deer winter crucial 0.06 Acres Operation DisturbanceBIG GAME 1490.05 Utah-Pronghorn year-long crucial 496.86 Acres Construction DisturbanceBIG GAME 1490.05 Utah-Pronghorn year-long crucial 96.23 Acres Operation DisturbanceBIG GAME 1495 Utah-Pronghorn year-long crucial 98.65 Acres Construction DisturbanceBIG GAME 1495 Utah-Pronghorn year-long crucial 18.49 Acres Operation DisturbanceBIG GAME 1500 Utah-Mule Deer winter crucial 0.00 Acres Construction DisturbanceBIG GAME 1500 Utah-Mule Deer winter crucial 0.00 Acres Operation DisturbanceBIG GAME 1500 Utah-Pronghorn year-long crucial 222.21 Acres Construction DisturbanceBIG GAME 1500 Utah-Pronghorn year-long crucial 31.72 Acres Operation DisturbanceBIG GAME 1500.02 Utah-Mule Deer winter crucial 21.53 Acres Construction DisturbanceBIG GAME 1500.02 Utah-Mule Deer winter crucial 3.69 Acres Operation DisturbanceBIG GAME 1500.02 Utah-Pronghorn year-long crucial 144.50 Acres Construction Disturbance

Page 25: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

BIG GAME 1500.02 Utah-Pronghorn year-long crucial 20.44 Acres Operation DisturbanceBIG GAME 1500.05 Utah-Mule Deer winter crucial 54.78 Acres Construction DisturbanceBIG GAME 1500.05 Utah-Mule Deer winter crucial 14.03 Acres Operation DisturbanceBIG GAME 1501.1 Utah-Mule Deer winter crucial 30.89 Acres Construction DisturbanceBIG GAME 1501.1 Utah-Mule Deer winter crucial 6.92 Acres Operation DisturbanceBIG GAME 1502.5 Utah-Desert Bighorn Sheep 4.34 Acres Construction DisturbanceBIG GAME 1502.5 Utah-Desert Bighorn Sheep 2.43 Acres Operation DisturbanceBIG GAME 1502.5 Utah-Mule Deer winter crucial 72.08 Acres Construction DisturbanceBIG GAME 1502.5 Utah-Mule Deer winter crucial 19.89 Acres Operation DisturbanceBIG GAME 1506 Utah-Mule Deer winter crucial 57.81 Acres Construction DisturbanceBIG GAME 1506 Utah-Mule Deer winter crucial 14.14 Acres Operation DisturbanceBIG GAME 1510 Nevada-Mule Deer 363.38 Acres Construction DisturbanceBIG GAME 1510 Nevada-Mule Deer 87.59 Acres Operation DisturbanceBIG GAME 1520 Nevada-Desert Bighorn Sheep 141.78 Acres Construction DisturbanceBIG GAME 1520 Nevada-Desert Bighorn Sheep 31.40 Acres Operation DisturbanceBIG GAME 1520 Nevada-Mule Deer 119.52 Acres Construction DisturbanceBIG GAME 1520 Nevada-Mule Deer 32.17 Acres Operation DisturbanceBIG GAME 1520 Nevada-Pronghorn 188.12 Acres Construction DisturbanceBIG GAME 1520 Nevada-Pronghorn 57.21 Acres Operation DisturbanceBIG GAME 1530 Nevada-Desert Bighorn Sheep 0.01 Acres Construction DisturbanceBIG GAME 1530 Nevada-Desert Bighorn Sheep 0.00 Acres Operation DisturbanceBIG GAME 1560 Nevada-Desert Bighorn Sheep 0.01 Acres Construction DisturbanceBIG GAME 1560 Nevada-Desert Bighorn Sheep 0.00 Acres Operation DisturbanceBIG GAME 1600 Nevada-Desert Bighorn Sheep 0.40 Acres Construction DisturbanceBIG GAME 1600 Nevada-Desert Bighorn Sheep 0.23 Acres Operation DisturbanceBIG GAME 1610 Nevada-Desert Bighorn Sheep 39.65 Acres Construction DisturbanceBIG GAME 1610 Nevada-Desert Bighorn Sheep 7.62 Acres Operation DisturbanceBIG GAME 1620 Nevada-Desert Bighorn Sheep 6.16 Acres Construction DisturbanceBIG GAME 1620 Nevada-Desert Bighorn Sheep 1.66 Acres Operation DisturbanceBIG GAME 1680 Nevada-Desert Bighorn Sheep 49.66 Acres Construction DisturbanceBIG GAME 1680 Nevada-Desert Bighorn Sheep 14.43 Acres Operation DisturbanceBIG GAME 1690 Nevada-Desert Bighorn Sheep 91.17 Acres Construction DisturbanceBIG GAME 1690 Nevada-Desert Bighorn Sheep 24.65 Acres Operation DisturbanceBIG GAME 1700 Nevada-Desert Bighorn Sheep 0.10 Acres Construction DisturbanceBIG GAME 1700 Nevada-Desert Bighorn Sheep 0.05 Acres Operation DisturbanceBIG GAME 1710 Nevada-Desert Bighorn Sheep 37.10 Acres Construction DisturbanceBIG GAME 1710 Nevada-Desert Bighorn Sheep 13.68 Acres Operation DisturbanceBIG GAME 1730 Nevada-Desert Bighorn Sheep 161.15 Acres Construction DisturbanceBIG GAME 1730 Nevada-Desert Bighorn Sheep 57.15 Acres Operation DisturbanceBIG GAME 1740 Nevada-Desert Bighorn Sheep 52.45 Acres Construction DisturbanceBIG GAME 1740 Nevada-Desert Bighorn Sheep 16.27 Acres Operation DisturbanceBIG GAME 1760 Nevada-Desert Bighorn Sheep 41.51 Acres Construction DisturbanceBIG GAME 1760 Nevada-Desert Bighorn Sheep 9.94 Acres Operation DisturbanceBIG GAME 1771 Nevada-Desert Bighorn Sheep 60.38 Acres Construction DisturbanceBIG GAME 1771 Nevada-Desert Bighorn Sheep 5.93 Acres Operation Disturbance

Page 26: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

BIG GAME 1780 Nevada-Desert Bighorn Sheep 24.97 Acres Construction DisturbanceBIG GAME 1780 Nevada-Desert Bighorn Sheep 5.08 Acres Operation DisturbanceBIG GAME 1790 Nevada-Desert Bighorn Sheep 114.30 Acres Construction DisturbanceBIG GAME 1790 Nevada-Desert Bighorn Sheep 21.84 Acres Operation DisturbanceBIG GAME 1810 Nevada-Desert Bighorn Sheep 8.80 Acres Construction DisturbanceBIG GAME 1810 Nevada-Desert Bighorn Sheep 1.83 Acres Operation DisturbanceBIG GAME 1830 Nevada-Desert Bighorn Sheep 0.39 Acres Construction DisturbanceBIG GAME 1830 Nevada-Desert Bighorn Sheep 0.14 Acres Operation DisturbanceBLM VRI Class Impacts 1030 II 18.08 Miles Amount CrossedBLM VRI Class Impacts 1030 III 0.55 Miles Amount CrossedBLM VRI Class Impacts 1030 IV 13.62 Miles Amount CrossedBLM VRI Class Impacts 1040 IV 9.18 Miles Amount CrossedBLM VRI Class Impacts 1100 IV 14.64 Miles Amount CrossedBLM VRI Class Impacts 1101 IV 0.80 Miles Amount CrossedBLM VRI Class Impacts 1103 IV 2.88 Miles Amount CrossedBLM VRI Class Impacts 1104 III 2.06 Miles Amount CrossedBLM VRI Class Impacts 1104 IV 1.87 Miles Amount CrossedBLM VRI Class Impacts 1105 III 3.16 Miles Amount CrossedBLM VRI Class Impacts 1105 IV 1.61 Miles Amount CrossedBLM VRI Class Impacts 1106 IV 5.66 Miles Amount CrossedBLM VRI Class Impacts 1110 IV 6.96 Miles Amount CrossedBLM VRI Class Impacts 1115 III 21.48 Miles Amount CrossedBLM VRI Class Impacts 1115 IV 24.38 Miles Amount CrossedBLM VRI Class Impacts 1116 II 7.38 Miles Amount CrossedBLM VRI Class Impacts 1116 III 0.02 Miles Amount CrossedBLM VRI Class Impacts 1120 III 18.33 Miles Amount CrossedBLM VRI Class Impacts 1120 IV 14.35 Miles Amount CrossedBLM VRI Class Impacts 1120.1 III 2.05 Miles Amount CrossedBLM VRI Class Impacts 1120.2 II 0.14 Miles Amount CrossedBLM VRI Class Impacts 1120.2 III 2.89 Miles Amount CrossedBLM VRI Class Impacts 1180 II 4.43 Miles Amount CrossedBLM VRI Class Impacts 1187 II 7.85 Miles Amount CrossedBLM VRI Class Impacts 1187 III 7.99 Miles Amount CrossedBLM VRI Class Impacts 1187 IV 29.53 Miles Amount CrossedBLM VRI Class Impacts 1190 II 9.74 Miles Amount CrossedBLM VRI Class Impacts 1190 III 57.92 Miles Amount CrossedBLM VRI Class Impacts 1190 IV 65.90 Miles Amount CrossedBLM VRI Class Impacts 1210 IV 24.73 Miles Amount CrossedBLM VRI Class Impacts 1211 IV 8.17 Miles Amount CrossedBLM VRI Class Impacts 1212 IV 13.75 Miles Amount CrossedBLM VRI Class Impacts 1214 IV 9.92 Miles Amount CrossedBLM VRI Class Impacts 1215 IV 7.37 Miles Amount CrossedBLM VRI Class Impacts 1215.05 IV 9.58 Miles Amount CrossedBLM VRI Class Impacts 1217.01 II 25.40 Miles Amount CrossedBLM VRI Class Impacts 1217.01 III 9.81 Miles Amount Crossed

Page 27: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

BLM VRI Class Impacts 1217.01 IV 38.60 Miles Amount CrossedBLM VRI Class Impacts 1217.02 II 16.03 Miles Amount CrossedBLM VRI Class Impacts 1217.051 II 8.33 Miles Amount CrossedBLM VRI Class Impacts 1217.051 III 11.97 Miles Amount CrossedBLM VRI Class Impacts 1217.052 II 7.83 Miles Amount CrossedBLM VRI Class Impacts 1217.1 II 2.14 Miles Amount CrossedBLM VRI Class Impacts 1217.1 III 13.62 Miles Amount CrossedBLM VRI Class Impacts 1217.1 IV 5.11 Miles Amount CrossedBLM VRI Class Impacts 1217.15 III 8.83 Miles Amount CrossedBLM VRI Class Impacts 1217.15 IV 11.06 Miles Amount CrossedBLM VRI Class Impacts 1218 II 11.97 Miles Amount CrossedBLM VRI Class Impacts 1219.1 II 0.60 Miles Amount CrossedBLM VRI Class Impacts 1219.2 II 14.93 Miles Amount CrossedBLM VRI Class Impacts 1219.3 II 1.47 Miles Amount CrossedBLM VRI Class Impacts 1219.4 II 0.93 Miles Amount CrossedBLM VRI Class Impacts 1219.45 II 0.25 Miles Amount CrossedBLM VRI Class Impacts 1219.45 III 1.35 Miles Amount CrossedBLM VRI Class Impacts 1219.5 II 16.37 Miles Amount CrossedBLM VRI Class Impacts 1219.6 II 3.55 Miles Amount CrossedBLM VRI Class Impacts 1219.6 III 1.02 Miles Amount CrossedBLM VRI Class Impacts 1220 II 13.89 Miles Amount CrossedBLM VRI Class Impacts 1220 III 24.18 Miles Amount CrossedBLM VRI Class Impacts 1220 IV 142.18 Miles Amount CrossedBLM VRI Class Impacts 1222.05 III 6.81 Miles Amount CrossedBLM VRI Class Impacts 1222.05 IV 34.36 Miles Amount CrossedBLM VRI Class Impacts 1222.3 II 4.95 Miles Amount CrossedBLM VRI Class Impacts 1222.3 IV 9.22 Miles Amount CrossedBLM VRI Class Impacts 1223 III 6.29 Miles Amount CrossedBLM VRI Class Impacts 1223 IV 11.86 Miles Amount CrossedBLM VRI Class Impacts 1225.2 II 7.87 Miles Amount CrossedBLM VRI Class Impacts 1225.2 III 23.63 Miles Amount CrossedBLM VRI Class Impacts 1225.2 IV 6.91 Miles Amount CrossedBLM VRI Class Impacts 1270 II 2.82 Miles Amount CrossedBLM VRI Class Impacts 1270 III 3.66 Miles Amount CrossedBLM VRI Class Impacts 1270 IV 4.29 Miles Amount CrossedBLM VRI Class Impacts 1310 II 0.29 Miles Amount CrossedBLM VRI Class Impacts 1310 III 4.58 Miles Amount CrossedBLM VRI Class Impacts 1310 IV 23.33 Miles Amount CrossedBLM VRI Class Impacts 1320.05 IV 17.76 Miles Amount CrossedBLM VRI Class Impacts 1320.15 II 9.41 Miles Amount CrossedBLM VRI Class Impacts 1320.15 IV 7.19 Miles Amount CrossedBLM VRI Class Impacts 1320.2 III 0.17 Miles Amount CrossedBLM VRI Class Impacts 1320.2 IV 6.22 Miles Amount CrossedBLM VRI Class Impacts 1320.21 III 0.27 Miles Amount CrossedBLM VRI Class Impacts 1325 II 0.70 Miles Amount Crossed

Page 28: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

BLM VRI Class Impacts 1325.1 II 5.50 Miles Amount CrossedBLM VRI Class Impacts 1325.2 II 1.08 Miles Amount CrossedBLM VRI Class Impacts 1325.2 III 3.02 Miles Amount CrossedBLM VRI Class Impacts 1330.1 III 10.49 Miles Amount CrossedBLM VRI Class Impacts 1330.1 IV 59.28 Miles Amount CrossedBLM VRI Class Impacts 1330.1 USFS 0.07 Miles Amount CrossedBLM VRI Class Impacts 1340 III 15.75 Miles Amount CrossedBLM VRI Class Impacts 1340 IV 4.26 Miles Amount CrossedBLM VRI Class Impacts 1350 III 12.25 Miles Amount CrossedBLM VRI Class Impacts 1350 IV 2.47 Miles Amount CrossedBLM VRI Class Impacts 1360 III 14.91 Miles Amount CrossedBLM VRI Class Impacts 1360 IV 12.21 Miles Amount CrossedBLM VRI Class Impacts 1370 IV 14.69 Miles Amount CrossedBLM VRI Class Impacts 1380 IV 10.99 Miles Amount CrossedBLM VRI Class Impacts 1380 USFS 0.00 Miles Amount CrossedBLM VRI Class Impacts 1390 III 0.28 Miles Amount CrossedBLM VRI Class Impacts 1390 IV 3.35 Miles Amount CrossedBLM VRI Class Impacts 1400 III 17.69 Miles Amount CrossedBLM VRI Class Impacts 1400 IV 6.35 Miles Amount CrossedBLM VRI Class Impacts 1410 IV 29.87 Miles Amount CrossedBLM VRI Class Impacts 1410 USFS 0.00 Miles Amount CrossedBLM VRI Class Impacts 1420 IV 7.95 Miles Amount CrossedBLM VRI Class Impacts 1430 III 2.99 Miles Amount CrossedBLM VRI Class Impacts 1430 IV 15.46 Miles Amount CrossedBLM VRI Class Impacts 1440 III 0.83 Miles Amount CrossedBLM VRI Class Impacts 1440 IV 3.60 Miles Amount CrossedBLM VRI Class Impacts 1440 Not Rated 5.08 Miles Amount CrossedBLM VRI Class Impacts 1450 III 7.01 Miles Amount CrossedBLM VRI Class Impacts 1460 III 7.31 Miles Amount CrossedBLM VRI Class Impacts 1460 IV 28.62 Miles Amount CrossedBLM VRI Class Impacts 1470 III 6.21 Miles Amount CrossedBLM VRI Class Impacts 1470 IV 32.49 Miles Amount CrossedBLM VRI Class Impacts 1480 III 9.62 Miles Amount CrossedBLM VRI Class Impacts 1480 IV 54.85 Miles Amount CrossedBLM VRI Class Impacts 1490 IV 14.10 Miles Amount CrossedBLM VRI Class Impacts 1490.05 III 0.52 Miles Amount CrossedBLM VRI Class Impacts 1490.05 IV 41.86 Miles Amount CrossedBLM VRI Class Impacts 1495 IV 7.64 Miles Amount CrossedBLM VRI Class Impacts 1500 IV 19.32 Miles Amount CrossedBLM VRI Class Impacts 1500.02 III 0.98 Miles Amount CrossedBLM VRI Class Impacts 1500.02 IV 17.64 Miles Amount CrossedBLM VRI Class Impacts 1500.05 III 4.48 Miles Amount CrossedBLM VRI Class Impacts 1500.05 IV 2.10 Miles Amount CrossedBLM VRI Class Impacts 1501.1 IV 0.43 Miles Amount CrossedBLM VRI Class Impacts 1502.5 II 2.38 Miles Amount Crossed

Page 29: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

BLM VRI Class Impacts 1502.5 III 21.89 Miles Amount CrossedBLM VRI Class Impacts 1502.5 IV 16.23 Miles Amount CrossedBLM VRI Class Impacts 1504 IV 0.75 Miles Amount CrossedBLM VRI Class Impacts 1505 III 0.07 Miles Amount CrossedBLM VRI Class Impacts 1505 IV 0.11 Miles Amount CrossedBLM VRI Class Impacts 1506 III 5.13 Miles Amount CrossedBLM VRI Class Impacts 1506 IV 3.65 Miles Amount CrossedBLM VRI Class Impacts 1510 II 12.58 Miles Amount CrossedBLM VRI Class Impacts 1510 III 24.76 Miles Amount CrossedBLM VRI Class Impacts 1510 IV 19.18 Miles Amount CrossedBLM VRI Class Impacts 1520 II 24.02 Miles Amount CrossedBLM VRI Class Impacts 1520 III 48.58 Miles Amount CrossedBLM VRI Class Impacts 1520 IV 52.15 Miles Amount CrossedBLM VRI Class Impacts 1530 II 0.15 Miles Amount CrossedBLM VRI Class Impacts 1530 III 5.60 Miles Amount CrossedBLM VRI Class Impacts 1530 IV 1.25 Miles Amount CrossedBLM VRI Class Impacts 1540.1 II 9.48 Miles Amount CrossedBLM VRI Class Impacts 1540.1 III 8.18 Miles Amount CrossedBLM VRI Class Impacts 1540.1 IV 4.69 Miles Amount CrossedBLM VRI Class Impacts 1540.2 II 2.13 Miles Amount CrossedBLM VRI Class Impacts 1540.2 III 1.89 Miles Amount CrossedBLM VRI Class Impacts 1540.2 IV 0.37 Miles Amount CrossedBLM VRI Class Impacts 1545 II 1.03 Miles Amount CrossedBLM VRI Class Impacts 1545 III 1.29 Miles Amount CrossedBLM VRI Class Impacts 1550.1 II 9.72 Miles Amount CrossedBLM VRI Class Impacts 1550.1 III 10.31 Miles Amount CrossedBLM VRI Class Impacts 1550.1 IV 3.67 Miles Amount CrossedBLM VRI Class Impacts 1550.2 II 2.05 Miles Amount CrossedBLM VRI Class Impacts 1550.2 III 9.49 Miles Amount CrossedBLM VRI Class Impacts 1550.2 IV 0.44 Miles Amount CrossedBLM VRI Class Impacts 1560 II 0.43 Miles Amount CrossedBLM VRI Class Impacts 1560 III 11.05 Miles Amount CrossedBLM VRI Class Impacts 1570 II 0.27 Miles Amount CrossedBLM VRI Class Impacts 1570 III 9.17 Miles Amount CrossedBLM VRI Class Impacts 1570 IV 0.28 Miles Amount CrossedBLM VRI Class Impacts 1580 IV 3.62 Miles Amount CrossedBLM VRI Class Impacts 1590 III 6.41 Miles Amount CrossedBLM VRI Class Impacts 1590 IV 0.61 Miles Amount CrossedBLM VRI Class Impacts 1600 III 5.49 Miles Amount CrossedBLM VRI Class Impacts 1610 III 6.09 Miles Amount CrossedBLM VRI Class Impacts 1610 IV 12.56 Miles Amount CrossedBLM VRI Class Impacts 1620 III 5.34 Miles Amount CrossedBLM VRI Class Impacts 1630 II 3.85 Miles Amount CrossedBLM VRI Class Impacts 1640 II 0.58 Miles Amount CrossedBLM VRI Class Impacts 1650 II 1.66 Miles Amount Crossed

Page 30: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

BLM VRI Class Impacts 1660 II 5.23 Miles Amount CrossedBLM VRI Class Impacts 1660 IV 0.21 Miles Amount CrossedBLM VRI Class Impacts 1670 II 0.94 Miles Amount CrossedBLM VRI Class Impacts 1690 II 0.61 Miles Amount CrossedBLM VRI Class Impacts 1730 II 2.50 Miles Amount CrossedBLM VRI Class Impacts 1740 II 1.76 Miles Amount CrossedBLM VRI Class Impacts 1790 II 1.52 Miles Amount CrossedBLM VRI Class Impacts 1790 III 2.23 Miles Amount CrossedBLM VRI Class Impacts 1790 IV 7.21 Miles Amount CrossedBLM VRI Class Impacts 1810 III 0.77 Miles Amount CrossedBLM VRI Class Impacts 1810 IV 1.80 Miles Amount CrossedBLM VRM Class Impacts 1030 Class IV 12.54 Miles Amount CrossedBLM VRM Class Impacts 1040 Class IV 4.76 Miles Amount CrossedBLM VRM Class Impacts 1100 Class III 11.69 Miles Amount CrossedBLM VRM Class Impacts 1101 Class III 0.32 Miles Amount CrossedBLM VRM Class Impacts 1104 Class III 0.26 Miles Amount CrossedBLM VRM Class Impacts 1105 Class III 2.19 Miles Amount CrossedBLM VRM Class Impacts 1106 Class III 1.24 Miles Amount CrossedBLM VRM Class Impacts 1110 Class III 1.56 Miles Amount CrossedBLM VRM Class Impacts 1110 Class IV 2.04 Miles Amount CrossedBLM VRM Class Impacts 1115 Class III 20.52 Miles Amount CrossedBLM VRM Class Impacts 1115 Class IV 19.97 Miles Amount CrossedBLM VRM Class Impacts 1116 Class III 7.40 Miles Amount CrossedBLM VRM Class Impacts 1120 Class III 8.68 Miles Amount CrossedBLM VRM Class Impacts 1120 Class IV 17.55 Miles Amount CrossedBLM VRM Class Impacts 1120.1 Class III 2.05 Miles Amount CrossedBLM VRM Class Impacts 1120.2 Class III 3.04 Miles Amount CrossedBLM VRM Class Impacts 1180 Class III 4.43 Miles Amount CrossedBLM VRM Class Impacts 1187 Class III 34.88 Miles Amount CrossedBLM VRM Class Impacts 1190 Class III 23.26 Miles Amount CrossedBLM VRM Class Impacts 1190 Class IV 28.96 Miles Amount CrossedBLM VRM Class Impacts 1210 Class III 16.02 Miles Amount CrossedBLM VRM Class Impacts 1211 Class III 7.64 Miles Amount CrossedBLM VRM Class Impacts 1211 Class IV 0.53 Miles Amount CrossedBLM VRM Class Impacts 1212 Class III 3.10 Miles Amount CrossedBLM VRM Class Impacts 1212 Class IV 10.65 Miles Amount CrossedBLM VRM Class Impacts 1214 Class III 5.95 Miles Amount CrossedBLM VRM Class Impacts 1214 Class IV 0.50 Miles Amount CrossedBLM VRM Class Impacts 1215 Class IV 7.18 Miles Amount CrossedBLM VRM Class Impacts 1215.05 Class III 0.64 Miles Amount CrossedBLM VRM Class Impacts 1215.05 Class IV 8.94 Miles Amount CrossedBLM VRM Class Impacts 1217.01 Class II 2.18 Miles Amount CrossedBLM VRM Class Impacts 1217.01 Class III 6.70 Miles Amount CrossedBLM VRM Class Impacts 1217.01 Class IV 51.49 Miles Amount CrossedBLM VRM Class Impacts 1217.02 Class III 1.65 Miles Amount Crossed

Page 31: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

BLM VRM Class Impacts 1217.051 Class III 0.47 Miles Amount CrossedBLM VRM Class Impacts 1217.052 Modification 1.90 Miles Amount CrossedBLM VRM Class Impacts 1217.052 Partial Retention 6.09 Miles Amount CrossedBLM VRM Class Impacts 1217.1 Class III 1.74 Miles Amount CrossedBLM VRM Class Impacts 1217.1 Class IV 0.52 Miles Amount CrossedBLM VRM Class Impacts 1217.15 Class III 2.51 Miles Amount CrossedBLM VRM Class Impacts 1217.15 Partial Retention 8.05 Miles Amount CrossedBLM VRM Class Impacts 1217.15 Retention 0.05 Miles Amount CrossedBLM VRM Class Impacts 1218 Class III 3.13 Miles Amount CrossedBLM VRM Class Impacts 1219.2 Class III 2.46 Miles Amount CrossedBLM VRM Class Impacts 1219.2 Class IV 3.49 Miles Amount CrossedBLM VRM Class Impacts 1219.2 Modification 1.20 Miles Amount CrossedBLM VRM Class Impacts 1219.2 Partial Retention 0.89 Miles Amount CrossedBLM VRM Class Impacts 1219.2 Retention 0.39 Miles Amount CrossedBLM VRM Class Impacts 1219.5 Class III 2.93 Miles Amount CrossedBLM VRM Class Impacts 1220 Class II 5.54 Miles Amount CrossedBLM VRM Class Impacts 1220 Class III 112.72 Miles Amount CrossedBLM VRM Class Impacts 1220 Class IV 31.82 Miles Amount CrossedBLM VRM Class Impacts 1222.05 Class III 12.87 Miles Amount CrossedBLM VRM Class Impacts 1222.05 Class IV 17.65 Miles Amount CrossedBLM VRM Class Impacts 1222.3 Class III 1.29 Miles Amount CrossedBLM VRM Class Impacts 1222.3 Class IV 0.44 Miles Amount CrossedBLM VRM Class Impacts 1223 Class III 3.80 Miles Amount CrossedBLM VRM Class Impacts 1223 Class IV 0.45 Miles Amount CrossedBLM VRM Class Impacts 1225.2 Class III 22.68 Miles Amount CrossedBLM VRM Class Impacts 1270 Class III 1.50 Miles Amount CrossedBLM VRM Class Impacts 1270 Class IV 0.47 Miles Amount CrossedBLM VRM Class Impacts 1310 Class III 6.35 Miles Amount CrossedBLM VRM Class Impacts 1310 Class IV 0.12 Miles Amount CrossedBLM VRM Class Impacts 1310 Modification 3.60 Miles Amount CrossedBLM VRM Class Impacts 1310 Partial Retention 11.15 Miles Amount CrossedBLM VRM Class Impacts 1320.05 Class III 4.66 Miles Amount CrossedBLM VRM Class Impacts 1320.05 Class IV 10.44 Miles Amount CrossedBLM VRM Class Impacts 1320.15 Modification 0.29 Miles Amount CrossedBLM VRM Class Impacts 1320.15 Partial Retention 0.91 Miles Amount CrossedBLM VRM Class Impacts 1320.15 Retention 0.30 Miles Amount CrossedBLM VRM Class Impacts 1320.2 Class III 0.25 Miles Amount CrossedBLM VRM Class Impacts 1320.2 Class IV 0.75 Miles Amount CrossedBLM VRM Class Impacts 1323 Modification 0.63 Miles Amount CrossedBLM VRM Class Impacts 1323 Partial Retention 4.00 Miles Amount CrossedBLM VRM Class Impacts 1324 Modification 0.80 Miles Amount CrossedBLM VRM Class Impacts 1324 Partial Retention 3.85 Miles Amount CrossedBLM VRM Class Impacts 1324.2 Modification 0.71 Miles Amount CrossedBLM VRM Class Impacts 1324.2 Partial Retention 3.99 Miles Amount CrossedBLM VRM Class Impacts 1324.4 Modification 0.71 Miles Amount Crossed

Page 32: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

BLM VRM Class Impacts 1324.4 Partial Retention 4.04 Miles Amount CrossedBLM VRM Class Impacts 1325 Modification 2.62 Miles Amount CrossedBLM VRM Class Impacts 1325 Partial Retention 5.77 Miles Amount CrossedBLM VRM Class Impacts 1325.1 Modification 11.98 Miles Amount CrossedBLM VRM Class Impacts 1325.2 Class III 0.00 Miles Amount CrossedBLM VRM Class Impacts 1330.1 Class III 11.77 Miles Amount CrossedBLM VRM Class Impacts 1330.1 Class IV 13.11 Miles Amount CrossedBLM VRM Class Impacts 1330.1 High 6.82 Miles Amount CrossedBLM VRM Class Impacts 1330.1 Moderate 19.62 Miles Amount CrossedBLM VRM Class Impacts 1340 Class III 1.40 Miles Amount CrossedBLM VRM Class Impacts 1340 Class IV 2.32 Miles Amount CrossedBLM VRM Class Impacts 1350 Class IV 2.91 Miles Amount CrossedBLM VRM Class Impacts 1360 Class III 12.90 Miles Amount CrossedBLM VRM Class Impacts 1360 Class IV 9.85 Miles Amount CrossedBLM VRM Class Impacts 1370 Class IV 9.29 Miles Amount CrossedBLM VRM Class Impacts 1380 Class III 1.50 Miles Amount CrossedBLM VRM Class Impacts 1380 Class IV 0.28 Miles Amount CrossedBLM VRM Class Impacts 1380 Moderate 2.23 Miles Amount CrossedBLM VRM Class Impacts 1390 Class III 2.28 Miles Amount CrossedBLM VRM Class Impacts 1390 Class IV 0.80 Miles Amount CrossedBLM VRM Class Impacts 1400 Class III 0.90 Miles Amount CrossedBLM VRM Class Impacts 1400 Class IV 8.85 Miles Amount CrossedBLM VRM Class Impacts 1410 Class III 4.77 Miles Amount CrossedBLM VRM Class Impacts 1410 Class IV 6.68 Miles Amount CrossedBLM VRM Class Impacts 1410 Moderate 7.45 Miles Amount CrossedBLM VRM Class Impacts 1420 Class III 1.01 Miles Amount CrossedBLM VRM Class Impacts 1430 Class IV 16.20 Miles Amount CrossedBLM VRM Class Impacts 1440 Class IV 1.23 Miles Amount CrossedBLM VRM Class Impacts 1450 Class IV 7.01 Miles Amount CrossedBLM VRM Class Impacts 1460 Class IV 35.22 Miles Amount CrossedBLM VRM Class Impacts 1470 Class IV 34.32 Miles Amount CrossedBLM VRM Class Impacts 1480 Class IV 53.94 Miles Amount CrossedBLM VRM Class Impacts 1490 Class IV 4.90 Miles Amount CrossedBLM VRM Class Impacts 1490.05 Class III 1.61 Miles Amount CrossedBLM VRM Class Impacts 1490.05 Class IV 8.08 Miles Amount CrossedBLM VRM Class Impacts 1495 Class IV 3.46 Miles Amount CrossedBLM VRM Class Impacts 1500 Class IV 12.46 Miles Amount CrossedBLM VRM Class Impacts 1500.02 Class IV 2.91 Miles Amount CrossedBLM VRM Class Impacts 1500.05 Class IV 5.08 Miles Amount CrossedBLM VRM Class Impacts 1500.05 High 0.89 Miles Amount CrossedBLM VRM Class Impacts 1500.05 Moderate 1.78 Miles Amount CrossedBLM VRM Class Impacts 1501.1 High 4.13 Miles Amount CrossedBLM VRM Class Impacts 1501.1 Moderate 9.60 Miles Amount CrossedBLM VRM Class Impacts 1501.15 Moderate 1.04 Miles Amount CrossedBLM VRM Class Impacts 1502.5 Class III 25.10 Miles Amount Crossed

Page 33: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

BLM VRM Class Impacts 1502.5 Class IV 12.24 Miles Amount CrossedBLM VRM Class Impacts 1502.5 Moderate 2.40 Miles Amount CrossedBLM VRM Class Impacts 1503 High 6.54 Miles Amount CrossedBLM VRM Class Impacts 1503 Moderate 0.06 Miles Amount CrossedBLM VRM Class Impacts 1503.5 Moderate 0.65 Miles Amount CrossedBLM VRM Class Impacts 1504 Class IV 0.49 Miles Amount CrossedBLM VRM Class Impacts 1504 High 6.18 Miles Amount CrossedBLM VRM Class Impacts 1504 Moderate 0.06 Miles Amount CrossedBLM VRM Class Impacts 1505 High 8.46 Miles Amount CrossedBLM VRM Class Impacts 1505 Moderate 0.61 Miles Amount CrossedBLM VRM Class Impacts 1506 Class III 1.75 Miles Amount CrossedBLM VRM Class Impacts 1506 Class IV 3.67 Miles Amount CrossedBLM VRM Class Impacts 1506 High 19.09 Miles Amount CrossedBLM VRM Class Impacts 1506 Moderate 0.69 Miles Amount CrossedBLM VRM Class Impacts 1510 Class III 27.49 Miles Amount CrossedBLM VRM Class Impacts 1510 Class IV 28.35 Miles Amount CrossedBLM VRM Class Impacts 1520 Class II 4.92 Miles Amount CrossedBLM VRM Class Impacts 1520 Class III 55.40 Miles Amount CrossedBLM VRM Class Impacts 1520 Class IV 63.96 Miles Amount CrossedBLM VRM Class Impacts 1530 Class II 0.57 Miles Amount CrossedBLM VRM Class Impacts 1530 Class IV 6.43 Miles Amount CrossedBLM VRM Class Impacts 1540.1 Class II 0.05 Miles Amount CrossedBLM VRM Class Impacts 1540.1 Class III 19.15 Miles Amount CrossedBLM VRM Class Impacts 1540.1 Class IV 3.00 Miles Amount CrossedBLM VRM Class Impacts 1540.2 Class III 2.50 Miles Amount CrossedBLM VRM Class Impacts 1540.2 Class IV 1.89 Miles Amount CrossedBLM VRM Class Impacts 1545 Class III 2.32 Miles Amount CrossedBLM VRM Class Impacts 1550.1 Class II 0.52 Miles Amount CrossedBLM VRM Class Impacts 1550.1 Class III 19.15 Miles Amount CrossedBLM VRM Class Impacts 1550.1 Class IV 4.04 Miles Amount CrossedBLM VRM Class Impacts 1550.2 Class III 11.98 Miles Amount CrossedBLM VRM Class Impacts 1560 Class III 11.48 Miles Amount CrossedBLM VRM Class Impacts 1570 Class III 9.72 Miles Amount CrossedBLM VRM Class Impacts 1580 Class III 0.82 Miles Amount CrossedBLM VRM Class Impacts 1580 Class IV 2.80 Miles Amount CrossedBLM VRM Class Impacts 1590 Class III 7.02 Miles Amount CrossedBLM VRM Class Impacts 1600 Class III 5.49 Miles Amount CrossedBLM VRM Class Impacts 1610 Class III 13.01 Miles Amount CrossedBLM VRM Class Impacts 1610 Class IV 5.63 Miles Amount CrossedBLM VRM Class Impacts 1620 Class III 5.34 Miles Amount CrossedBLM VRM Class Impacts 1630 Class III 3.85 Miles Amount CrossedBLM VRM Class Impacts 1640 Class III 0.57 Miles Amount CrossedBLM VRM Class Impacts 1650 Class III 1.66 Miles Amount CrossedBLM VRM Class Impacts 1660 Class III 4.97 Miles Amount CrossedBLM VRM Class Impacts 1670 Class III 0.94 Miles Amount Crossed

Page 34: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

BLM VRM Class Impacts 1690 Class III 0.61 Miles Amount CrossedBLM VRM Class Impacts 1730 Class III 2.50 Miles Amount CrossedBLM VRM Class Impacts 1740 Class III 1.76 Miles Amount CrossedBLM VRM Class Impacts 1740 Class IV 0.00 Miles Amount CrossedBLM VRM Class Impacts 1790 Class III 8.01 Miles Amount CrossedBLM VRM Class Impacts 1790 Class IV 2.83 Miles Amount CrossedBLM VRM Class Impacts 1810 Class III 2.58 Miles Amount CrossedCOMMUNICATION SITES 1030 SITES 7.00 Each CountCOMMUNICATION SITES 1040 SITES 1.00 Each CountCOMMUNICATION SITES 1100 SITES 3.00 Each CountCOMMUNICATION SITES 1104 SITES 3.00 Each CountCOMMUNICATION SITES 1105 SITES 7.00 Each CountCOMMUNICATION SITES 1106 SITES 3.00 Each CountCOMMUNICATION SITES 1190 SITES 14.00 Each CountCOMMUNICATION SITES 1210 SITES 1.00 Each CountCOMMUNICATION SITES 1215 SITES 1.00 Each CountCOMMUNICATION SITES 1215.05 SITES 1.00 Each CountCOMMUNICATION SITES 1217.01 SITES 26.00 Each CountCOMMUNICATION SITES 1217.051 SITES 8.00 Each CountCOMMUNICATION SITES 1217.052 SITES 11.00 Each CountCOMMUNICATION SITES 1217.1 SITES 24.00 Each CountCOMMUNICATION SITES 1217.15 SITES 11.00 Each CountCOMMUNICATION SITES 1219.2 SITES 2.00 Each CountCOMMUNICATION SITES 1220 SITES 72.00 Each CountCOMMUNICATION SITES 1222.05 SITES 8.00 Each CountCOMMUNICATION SITES 1310 SITES 24.00 Each CountCOMMUNICATION SITES 1320.05 SITES 8.00 Each CountCOMMUNICATION SITES 1320.15 SITES 21.00 Each CountCOMMUNICATION SITES 1321 SITES 2.00 Each CountCOMMUNICATION SITES 1323 SITES 10.00 Each CountCOMMUNICATION SITES 1325.1 SITES 10.00 Each CountCOMMUNICATION SITES 1330.1 SITES 33.00 Each CountCOMMUNICATION SITES 1340 SITES 4.00 Each CountCOMMUNICATION SITES 1350 SITES 11.00 Each CountCOMMUNICATION SITES 1360 SITES 1.00 Each CountCOMMUNICATION SITES 1380 SITES 7.00 Each CountCOMMUNICATION SITES 1390 SITES 4.00 Each CountCOMMUNICATION SITES 1410 SITES 46.00 Each CountCOMMUNICATION SITES 1420 SITES 4.00 Each CountCOMMUNICATION SITES 1460 SITES 4.00 Each CountCOMMUNICATION SITES 1470 SITES 5.00 Each CountCOMMUNICATION SITES 1490.05 SITES 5.00 Each CountCOMMUNICATION SITES 1500.02 SITES 1.00 Each CountCOMMUNICATION SITES 1500.05 SITES 2.00 Each CountCOMMUNICATION SITES 1501.1 SITES 5.00 Each Count

Page 35: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

COMMUNICATION SITES 1502.5 SITES 2.00 Each CountCOMMUNICATION SITES 1506 SITES 9.00 Each CountCOMMUNICATION SITES 1510 SITES 3.00 Each CountCOMMUNICATION SITES 1520 SITES 19.00 Each CountCOMMUNICATION SITES 1530 SITES 10.00 Each CountCOMMUNICATION SITES 1540.1 SITES 94.00 Each CountCOMMUNICATION SITES 1540.2 SITES 22.00 Each CountCOMMUNICATION SITES 1545 SITES 4.00 Each CountCOMMUNICATION SITES 1550.1 SITES 1.00 Each CountCOMMUNICATION SITES 1550.2 SITES 1.00 Each CountCOMMUNICATION SITES 1570 SITES 4.00 Each CountCOMMUNICATION SITES 1580 SITES 4.00 Each CountCOMMUNICATION SITES 1590 SITES 3.00 Each CountCOMMUNICATION SITES 1610 SITES 98.00 Each CountCOMMUNICATION SITES 1620 SITES 6.00 Each CountCOMMUNICATION SITES 1630 SITES 6.00 Each CountCOMMUNICATION SITES 1640 SITES 6.00 Each CountCOMMUNICATION SITES 1660 SITES 14.00 Each CountCOMMUNICATION SITES 1680 SITES 9.00 Each CountCOMMUNICATION SITES 1690 SITES 13.00 Each CountCOMMUNICATION SITES 1700 SITES 15.00 Each CountCOMMUNICATION SITES 1710 SITES 14.00 Each CountCOMMUNICATION SITES 1730 SITES 10.00 Each CountCOMMUNICATION SITES 1740 SITES 17.00 Each CountCOMMUNICATION SITES 1750 SITES 1.00 Each CountCOMMUNICATION SITES 1760 SITES 98.00 Each CountCOMMUNICATION SITES 1771 SITES 11.00 Each CountCOMMUNICATION SITES 1780 SITES 6.00 Each CountCOMMUNICATION SITES 1790 SITES 12.00 Each CountCOMMUNICATION SITES 1820 SITES 1.00 Each CountCOMMUNITIES 1030 Incorporated place 1.00 Each CountCOMMUNITIES 1190 Incorporated place 1.00 Each CountCOMMUNITIES 1210 Incorporated place 1.00 Each CountCOMMUNITIES 1217.1 Incorporated place 1.00 Each CountCOMMUNITIES 1217.15 Census designated place 1.00 Each CountCOMMUNITIES 1220 Census designated place 1.00 Each CountCOMMUNITIES 1220 Incorporated place 2.00 Each CountCOMMUNITIES 1310 Incorporated place 1.00 Each CountCOMMUNITIES 1320.05 Census designated place 1.00 Each CountCOMMUNITIES 1320.05 Incorporated place 2.00 Each CountCOMMUNITIES 1330.1 Incorporated place 3.00 Each CountCOMMUNITIES 1340 Incorporated place 1.00 Each CountCOMMUNITIES 1350 Incorporated place 1.00 Each CountCOMMUNITIES 1380 Incorporated place 1.00 Each CountCOMMUNITIES 1390 Incorporated place 1.00 Each Count

Page 36: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

COMMUNITIES 1500.05 Census designated place 1.00 Each CountCOMMUNITIES 1501.1 Census designated place 1.00 Each CountCOMMUNITIES 1506 Census designated place 1.00 Each CountCOMMUNITIES 1520 Census designated place 1.00 Each CountCOMMUNITIES 1540.1 Census designated place 2.00 Each CountCOMMUNITIES 1540.2 Census designated place 1.00 Each CountCOMMUNITIES 1545 Census designated place 1.00 Each CountCOMMUNITIES 1550.1 Census designated place 1.00 Each CountCOMMUNITIES 1610 Incorporated place 1.00 Each CountCOMMUNITIES 1660 Incorporated place 1.00 Each CountCOMMUNITIES 1680 Incorporated place 1.00 Each CountCOMMUNITIES 1690 Incorporated place 1.00 Each CountCOMMUNITIES 1700 Incorporated place 1.00 Each CountCOMMUNITIES 1730 Incorporated place 2.00 Each CountCOMMUNITIES 1740 Incorporated place 1.00 Each CountCOMMUNITIES 1760 Incorporated place 1.00 Each CountCOMMUNITIES 1771 Incorporated place 1.00 Each CountCOMMUNITIES 1772 Incorporated place 1.00 Each CountCOMMUNITIES 1780 Incorporated place 2.00 Each CountCOMMUNITIES 1790 Incorporated place 2.00 Each CountCOMMUNITIES 1800 Incorporated place 1.00 Each CountCOMMUNITIES 1810 Incorporated place 1.00 Each CountCOMMUNITIES 1820 Incorporated place 1.00 Each CountCOMMUNITIES 1830 Incorporated place 1.00 Each CountCRITICALHAB 1187 Colorado pikeminnow (=squawfish) 0.54 Acres Construction DisturbanceCRITICALHAB 1187 Colorado pikeminnow (=squawfish) 0.15 Acres Operation DisturbanceCRITICALHAB 1190 Colorado pikeminnow (=squawfish) 2.57 Acres Construction DisturbanceCRITICALHAB 1190 Colorado pikeminnow (=squawfish) 0.61 Acres Operation DisturbanceCRITICALHAB 1217.01 Colorado pikeminnow (=squawfish) 3.21 Acres Construction DisturbanceCRITICALHAB 1217.01 Colorado pikeminnow (=squawfish) 0.96 Acres Operation DisturbanceCRITICALHAB 1217.01 Razorback sucker 2.60 Acres Construction DisturbanceCRITICALHAB 1217.01 Razorback sucker 0.80 Acres Operation DisturbanceCRITICALHAB 1220 Colorado pikeminnow (=squawfish) 3.33 Acres Construction DisturbanceCRITICALHAB 1220 Colorado pikeminnow (=squawfish) 0.81 Acres Operation DisturbanceCRITICALHAB 1220 Razorback sucker 1.73 Acres Construction DisturbanceCRITICALHAB 1220 Razorback sucker 0.43 Acres Operation DisturbanceCRITICALHAB 1320.05 Colorado pikeminnow (=squawfish) 0.88 Acres Construction DisturbanceCRITICALHAB 1320.05 Colorado pikeminnow (=squawfish) 0.24 Acres Operation DisturbanceCRITICALHAB 1320.05 Razorback sucker 0.88 Acres Construction DisturbanceCRITICALHAB 1320.05 Razorback sucker 0.24 Acres Operation DisturbanceCRITICALHAB 1502.5 Desert tortoise 223.47 Acres Construction DisturbanceCRITICALHAB 1502.5 Desert tortoise 73.72 Acres Operation DisturbanceCRITICALHAB 1510 Desert tortoise 17.07 Acres Construction DisturbanceCRITICALHAB 1510 Desert tortoise 5.66 Acres Operation DisturbanceCRITICALHAB 1520 Desert tortoise 633.11 Acres Construction Disturbance

Page 37: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

CRITICALHAB 1520 Desert tortoise 129.61 Acres Operation DisturbanceCRITICALHAB 1530 Desert tortoise 74.01 Acres Construction DisturbanceCRITICALHAB 1530 Desert tortoise 15.17 Acres Operation DisturbanceCRITICALHAB 1540.1 Desert tortoise 176.79 Acres Construction DisturbanceCRITICALHAB 1540.1 Desert tortoise 24.29 Acres Operation DisturbanceCRITICALHAB 1550.1 Desert tortoise 79.93 Acres Construction DisturbanceCRITICALHAB 1550.1 Desert tortoise 27.90 Acres Operation DisturbanceCRITICALHAB 1610 Desert tortoise 24.94 Acres Construction DisturbanceCRITICALHAB 1610 Desert tortoise 5.13 Acres Operation DisturbanceCRITICALHAB 1670 Razorback sucker 1.99 Acres Construction DisturbanceCRITICALHAB 1670 Razorback sucker 0.57 Acres Operation DisturbanceCRITICALHAB 1710 Razorback sucker 2.90 Acres Construction DisturbanceCRITICALHAB 1710 Razorback sucker 1.53 Acres Operation DisturbanceCRITICALHAB 1771 Desert tortoise 42.55 Acres Construction DisturbanceCRITICALHAB 1771 Desert tortoise 8.96 Acres Operation DisturbanceCULTURAL-SITE DENSITY 1030 DENSITY 2.51 Sites/100 acres CountCULTURAL-SITE DENSITY 1040 DENSITY 0.86 Sites/100 acres CountCULTURAL-SITE DENSITY 1100 DENSITY 7.83 Sites/100 acres CountCULTURAL-SITE DENSITY 1104 DENSITY 42.21 Sites/100 acres CountCULTURAL-SITE DENSITY 1106 DENSITY 51.58 Sites/100 acres CountCULTURAL-SITE DENSITY 1110 DENSITY 2.80 Sites/100 acres CountCULTURAL-SITE DENSITY 1115 DENSITY 8.45 Sites/100 acres CountCULTURAL-SITE DENSITY 1116 DENSITY 11.86 Sites/100 acres CountCULTURAL-SITE DENSITY 1120 DENSITY 8.27 Sites/100 acres CountCULTURAL-SITE DENSITY 1180 DENSITY 11.32 Sites/100 acres CountCULTURAL-SITE DENSITY 1187 DENSITY 3.50 Sites/100 acres CountCULTURAL-SITE DENSITY 1190 DENSITY 5.83 Sites/100 acres CountCULTURAL-SITE DENSITY 1210 DENSITY 1.57 Sites/100 acres CountCULTURAL-SITE DENSITY 1211 DENSITY 0.27 Sites/100 acres CountCULTURAL-SITE DENSITY 1212 DENSITY 0.63 Sites/100 acres CountCULTURAL-SITE DENSITY 1214 DENSITY 0.24 Sites/100 acres CountCULTURAL-SITE DENSITY 1215 DENSITY 2.67 Sites/100 acres CountCULTURAL-SITE DENSITY 1215.05 DENSITY 0.50 Sites/100 acres CountCULTURAL-SITE DENSITY 1217.01 DENSITY 1.00 Sites/100 acres CountCULTURAL-SITE DENSITY 1217.051 DENSITY 4.59 Sites/100 acres CountCULTURAL-SITE DENSITY 1217.052 DENSITY 4.33 Sites/100 acres CountCULTURAL-SITE DENSITY 1217.1 DENSITY 7.85 Sites/100 acres CountCULTURAL-SITE DENSITY 1217.15 DENSITY 4.17 Sites/100 acres CountCULTURAL-SITE DENSITY 1218 DENSITY 3.41 Sites/100 acres CountCULTURAL-SITE DENSITY 1220 DENSITY 2.31 Sites/100 acres CountCULTURAL-SITE DENSITY 1222.05 DENSITY 1.92 Sites/100 acres CountCULTURAL-SITE DENSITY 1222.3 DENSITY 10.39 Sites/100 acres CountCULTURAL-SITE DENSITY 1223 DENSITY 4.88 Sites/100 acres CountCULTURAL-SITE DENSITY 1225.2 DENSITY 2.48 Sites/100 acres CountCULTURAL-SITE DENSITY 1270 DENSITY 9.56 Sites/100 acres Count

Page 38: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

CULTURAL-SITE DENSITY 1310 DENSITY 1.31 Sites/100 acres CountCULTURAL-SITE DENSITY 1320.05 DENSITY 2.47 Sites/100 acres CountCULTURAL-SITE DENSITY 1320.15 DENSITY 7.36 Sites/100 acres CountCULTURAL-SITE DENSITY 1321 DENSITY 7.22 Sites/100 acres CountCULTURAL-SITE DENSITY 1325.1 DENSITY 1.41 Sites/100 acres CountCULTURAL-SITE DENSITY 1330.1 DENSITY 2.33 Sites/100 acres CountCULTURAL-SITE DENSITY 1340 DENSITY 5.87 Sites/100 acres CountCULTURAL-SITE DENSITY 1350 DENSITY 5.62 Sites/100 acres CountCULTURAL-SITE DENSITY 1360 DENSITY 0.88 Sites/100 acres CountCULTURAL-SITE DENSITY 1370 DENSITY 6.78 Sites/100 acres CountCULTURAL-SITE DENSITY 1380 DENSITY 0.82 Sites/100 acres CountCULTURAL-SITE DENSITY 1400 DENSITY 2.27 Sites/100 acres CountCULTURAL-SITE DENSITY 1410 DENSITY 0.37 Sites/100 acres CountCULTURAL-SITE DENSITY 1430 DENSITY 0.83 Sites/100 acres CountCULTURAL-SITE DENSITY 1440 DENSITY 1.59 Sites/100 acres CountCULTURAL-SITE DENSITY 1450 DENSITY 4.20 Sites/100 acres CountCULTURAL-SITE DENSITY 1460 DENSITY 1.34 Sites/100 acres CountCULTURAL-SITE DENSITY 1480 DENSITY 0.46 Sites/100 acres CountCULTURAL-SITE DENSITY 1490 DENSITY 0.83 Sites/100 acres CountCULTURAL-SITE DENSITY 1490.05 DENSITY 3.02 Sites/100 acres CountCULTURAL-SITE DENSITY 1500 DENSITY 1.36 Sites/100 acres CountCULTURAL-SITE DENSITY 1500.02 DENSITY 0.95 Sites/100 acres CountCULTURAL-SITE DENSITY 1500.05 DENSITY 4.72 Sites/100 acres CountCULTURAL-SITE DENSITY 1501.1 DENSITY 11.64 Sites/100 acres CountCULTURAL-SITE DENSITY 1502.5 DENSITY 1.73 Sites/100 acres CountCULTURAL-SITE DENSITY 1503 DENSITY 1.47 Sites/100 acres CountCULTURAL-SITE DENSITY 1503.5 DENSITY 39.87 Sites/100 acres CountCULTURAL-SITE DENSITY 1504 DENSITY 1.09 Sites/100 acres CountCULTURAL-SITE DENSITY 1510 DENSITY 3.73 Sites/100 acres CountCULTURAL-SITE DENSITY 1520 DENSITY 1.89 Sites/100 acres CountCULTURAL-SITE DENSITY 1530 DENSITY 1.17 Sites/100 acres CountCULTURAL-SITE DENSITY 1540.1 DENSITY 0.92 Sites/100 acres CountCULTURAL-SITE DENSITY 1540.2 DENSITY 1.88 Sites/100 acres CountCULTURAL-SITE DENSITY 1545 DENSITY 11.02 Sites/100 acres CountCULTURAL-SITE DENSITY 1550.1 DENSITY 2.62 Sites/100 acres CountCULTURAL-SITE DENSITY 1550.2 DENSITY 0.51 Sites/100 acres CountCULTURAL-SITE DENSITY 1570 DENSITY 0.48 Sites/100 acres CountCULTURAL-SITE DENSITY 1580 DENSITY 7.01 Sites/100 acres CountCULTURAL-SITE DENSITY 1590 DENSITY 0.76 Sites/100 acres CountCULTURAL-SITE DENSITY 1600 DENSITY 8.92 Sites/100 acres CountCULTURAL-SITE DENSITY 1610 DENSITY 1.05 Sites/100 acres CountCULTURAL-SITE DENSITY 1620 DENSITY 3.46 Sites/100 acres CountCULTURAL-SITE DENSITY 1630 DENSITY 1.80 Sites/100 acres CountCULTURAL-SITE DENSITY 1660 DENSITY 7.86 Sites/100 acres CountCULTURAL-SITE DENSITY 1670 DENSITY 9.15 Sites/100 acres Count

Page 39: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

CULTURAL-SITE DENSITY 1680 DENSITY 6.88 Sites/100 acres CountCULTURAL-SITE DENSITY 1690 DENSITY 5.84 Sites/100 acres CountCULTURAL-SITE DENSITY 1700 DENSITY 7.44 Sites/100 acres CountCULTURAL-SITE DENSITY 1710 DENSITY 5.17 Sites/100 acres CountCULTURAL-SITE DENSITY 1730 DENSITY 3.71 Sites/100 acres CountCULTURAL-SITE DENSITY 1740 DENSITY 25.36 Sites/100 acres CountCULTURAL-SITE DENSITY 1750 DENSITY 10.04 Sites/100 acres CountCULTURAL-SITE DENSITY 1760 DENSITY 6.85 Sites/100 acres CountCULTURAL-SITE DENSITY 1771 DENSITY 3.40 Sites/100 acres CountCULTURAL-SITE DENSITY 1780 DENSITY 5.58 Sites/100 acres CountCULTURAL-SITE DENSITY 1790 DENSITY 1.15 Sites/100 acres CountCULTURAL-SITE DENSITY 1800 DENSITY 37.52 Sites/100 acres CountCULTURAL-SITE DENSITY 1810 DENSITY 2.48 Sites/100 acres CountCULTURAL-SITE DENSITY 1820 DENSITY 1.87 Sites/100 acres CountCULTURAL-SITES 1030 Eligible 18.00 Each CountCULTURAL-SITES 1030 Eligible 4.00 Each CountCULTURAL-SITES 1030 Potential TCP 1.00 Each CountCULTURAL-SITES 1030 Unevaluated 1.00 Each CountCULTURAL-SITES 1030 Unevaluated 6.00 Each CountCULTURAL-SITES 1040 Eligible 1.00 Each CountCULTURAL-SITES 1040 Unevaluated 1.00 Each CountCULTURAL-SITES 1106 Unevaluated 1.00 Each CountCULTURAL-SITES 1110 Eligible 3.00 Each CountCULTURAL-SITES 1115 Eligible 1.00 Each CountCULTURAL-SITES 1115 Eligible 2.00 Each CountCULTURAL-SITES 1115 Eligible 3.00 Each CountCULTURAL-SITES 1115 Unevaluated 1.00 Each CountCULTURAL-SITES 1115 Unevaluated 2.00 Each CountCULTURAL-SITES 1115 Unevaluated 4.00 Each CountCULTURAL-SITES 1116 Eligible 1.00 Each CountCULTURAL-SITES 1116 Unevaluated 1.00 Each CountCULTURAL-SITES 1120 Eligible 4.00 Each CountCULTURAL-SITES 1120 Eligible 1.00 Each CountCULTURAL-SITES 1120 Eligible 2.00 Each CountCULTURAL-SITES 1120 Eligible 3.00 Each CountCULTURAL-SITES 1120 Unevaluated 1.00 Each CountCULTURAL-SITES 1180 Eligible 1.00 Each CountCULTURAL-SITES 1180 Unevaluated 1.00 Each CountCULTURAL-SITES 1187 Eligible 1.00 Each CountCULTURAL-SITES 1187 Potential TCP 1.00 Each CountCULTURAL-SITES 1187 Unevaluated 1.00 Each CountCULTURAL-SITES 1190 Eligible 3.00 Each CountCULTURAL-SITES 1190 Eligible 1.00 Each CountCULTURAL-SITES 1190 Eligible 2.00 Each CountCULTURAL-SITES 1190 Eligible 4.00 Each Count

Page 40: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

CULTURAL-SITES 1190 Unevaluated 3.00 Each CountCULTURAL-SITES 1190 Unevaluated 1.00 Each CountCULTURAL-SITES 1190 Unevaluated 2.00 Each CountCULTURAL-SITES 1190 Unevaluated 4.00 Each CountCULTURAL-SITES 1210 Unevaluated 1.00 Each CountCULTURAL-SITES 1211 Eligible 1.00 Each CountCULTURAL-SITES 1212 Eligible 2.00 Each CountCULTURAL-SITES 1215 Eligible 1.00 Each CountCULTURAL-SITES 1215 Eligible 2.00 Each CountCULTURAL-SITES 1215.05 Unevaluated 1.00 Each CountCULTURAL-SITES 1217.01 Eligible 3.00 Each CountCULTURAL-SITES 1217.01 Eligible 1.00 Each CountCULTURAL-SITES 1217.01 Unevaluated 1.00 Each CountCULTURAL-SITES 1217.051 Eligible 1.00 Each CountCULTURAL-SITES 1217.052 Eligible 1.00 Each CountCULTURAL-SITES 1217.052 Unevaluated 1.00 Each CountCULTURAL-SITES 1217.1 Eligible 1.00 Each CountCULTURAL-SITES 1217.1 Eligible 11.00 Each CountCULTURAL-SITES 1217.1 Eligible 2.00 Each CountCULTURAL-SITES 1217.1 Potential TCP 1.00 Each CountCULTURAL-SITES 1217.1 Unevaluated 1.00 Each CountCULTURAL-SITES 1217.15 Eligible 1.00 Each CountCULTURAL-SITES 1217.15 Unevaluated 1.00 Each CountCULTURAL-SITES 1220 Eligible 9.00 Each CountCULTURAL-SITES 1220 Eligible 7.00 Each CountCULTURAL-SITES 1220 Eligible 1.00 Each CountCULTURAL-SITES 1220 Eligible 2.00 Each CountCULTURAL-SITES 1220 Eligible 4.00 Each CountCULTURAL-SITES 1220 Eligible 3.00 Each CountCULTURAL-SITES 1220 Eligible 11.00 Each CountCULTURAL-SITES 1220 Eligible 14.00 Each CountCULTURAL-SITES 1220 Listed 3.00 Each CountCULTURAL-SITES 1220 Potential TCP 1.00 Each CountCULTURAL-SITES 1220 Potential TCP 3.00 Each CountCULTURAL-SITES 1220 Potential TCP 2.00 Each CountCULTURAL-SITES 1220 Unevaluated 3.00 Each CountCULTURAL-SITES 1220 Unevaluated 5.00 Each CountCULTURAL-SITES 1220 Unevaluated 2.00 Each CountCULTURAL-SITES 1220 Unevaluated 4.00 Each CountCULTURAL-SITES 1220 Unevaluated 1.00 Each CountCULTURAL-SITES 1222.05 Eligible 2.00 Each CountCULTURAL-SITES 1222.05 Eligible 4.00 Each CountCULTURAL-SITES 1222.3 Eligible 3.00 Each CountCULTURAL-SITES 1222.3 Eligible 1.00 Each CountCULTURAL-SITES 1222.3 Eligible 2.00 Each Count

Page 41: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

CULTURAL-SITES 1222.3 Potential TCP 1.00 Each CountCULTURAL-SITES 1222.3 Unevaluated 1.00 Each CountCULTURAL-SITES 1223 Eligible 1.00 Each CountCULTURAL-SITES 1223 Eligible 4.00 Each CountCULTURAL-SITES 1223 Unevaluated 1.00 Each CountCULTURAL-SITES 1225.2 Eligible 16.00 Each CountCULTURAL-SITES 1225.2 Eligible 2.00 Each CountCULTURAL-SITES 1225.2 Unevaluated 3.00 Each CountCULTURAL-SITES 1270 Eligible 17.00 Each CountCULTURAL-SITES 1270 Eligible 1.00 Each CountCULTURAL-SITES 1270 Unevaluated 15.00 Each CountCULTURAL-SITES 1310 Eligible 1.00 Each CountCULTURAL-SITES 1310 Eligible 5.00 Each CountCULTURAL-SITES 1310 Potential TCP 1.00 Each CountCULTURAL-SITES 1320.05 Eligible 4.00 Each CountCULTURAL-SITES 1320.05 Eligible 1.00 Each CountCULTURAL-SITES 1320.15 Eligible 2.00 Each CountCULTURAL-SITES 1325.1 Eligible 1.00 Each CountCULTURAL-SITES 1325.1 Eligible 2.00 Each CountCULTURAL-SITES 1330.1 Eligible 2.00 Each CountCULTURAL-SITES 1330.1 Eligible 1.00 Each CountCULTURAL-SITES 1330.1 Eligible 4.00 Each CountCULTURAL-SITES 1330.1 Eligible 3.00 Each CountCULTURAL-SITES 1330.1 Potential TCP 1.00 Each CountCULTURAL-SITES 1330.1 Potential TCP 7.00 Each CountCULTURAL-SITES 1330.1 Unevaluated 59.00 Each CountCULTURAL-SITES 1330.1 Unevaluated 4.00 Each CountCULTURAL-SITES 1330.1 Unevaluated 1.00 Each CountCULTURAL-SITES 1330.1 Unevaluated 2.00 Each CountCULTURAL-SITES 1330.1 Unevaluated 7.00 Each CountCULTURAL-SITES 1330.1 Unevaluated 6.00 Each CountCULTURAL-SITES 1330.1 Unevaluated 8.00 Each CountCULTURAL-SITES 1340 Eligible 1.00 Each CountCULTURAL-SITES 1340 Eligible 2.00 Each CountCULTURAL-SITES 1340 Eligible 3.00 Each CountCULTURAL-SITES 1350 Eligible 2.00 Each CountCULTURAL-SITES 1350 Eligible 3.00 Each CountCULTURAL-SITES 1360 Eligible 1.00 Each CountCULTURAL-SITES 1370 Eligible 1.00 Each CountCULTURAL-SITES 1400 Eligible 1.00 Each CountCULTURAL-SITES 1410 Eligible 6.00 Each CountCULTURAL-SITES 1430 Eligible 2.00 Each CountCULTURAL-SITES 1440 Eligible 2.00 Each CountCULTURAL-SITES 1440 Eligible 1.00 Each CountCULTURAL-SITES 1440 Potential TCP 2.00 Each Count

Page 42: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

CULTURAL-SITES 1440 Potential TCP 1.00 Each CountCULTURAL-SITES 1450 Eligible 2.00 Each CountCULTURAL-SITES 1460 Eligible 5.00 Each CountCULTURAL-SITES 1460 Eligible 3.00 Each CountCULTURAL-SITES 1460 Unevaluated 1.00 Each CountCULTURAL-SITES 1480 Eligible 1.00 Each CountCULTURAL-SITES 1480 Eligible 17.00 Each CountCULTURAL-SITES 1480 Eligible 8.00 Each CountCULTURAL-SITES 1480 Unevaluated 1.00 Each CountCULTURAL-SITES 1490 Unevaluated 1.00 Each CountCULTURAL-SITES 1490.05 Eligible 2.00 Each CountCULTURAL-SITES 1490.05 Eligible 1.00 Each CountCULTURAL-SITES 1500 Eligible 4.00 Each CountCULTURAL-SITES 1500 Eligible 1.00 Each CountCULTURAL-SITES 1500 Eligible 3.00 Each CountCULTURAL-SITES 1500.02 Eligible 3.00 Each CountCULTURAL-SITES 1500.02 Eligible 4.00 Each CountCULTURAL-SITES 1500.02 Eligible 1.00 Each CountCULTURAL-SITES 1500.05 Unevaluated 1.00 Each CountCULTURAL-SITES 1501.1 Eligible 1.00 Each CountCULTURAL-SITES 1501.1 Eligible 2.00 Each CountCULTURAL-SITES 1501.1 Unevaluated 1.00 Each CountCULTURAL-SITES 1501.1 Unevaluated 3.00 Each CountCULTURAL-SITES 1502.5 Eligible 1.00 Each CountCULTURAL-SITES 1502.5 Eligible 7.00 Each CountCULTURAL-SITES 1502.5 Eligible 3.00 Each CountCULTURAL-SITES 1502.5 Eligible 15.00 Each CountCULTURAL-SITES 1502.5 Unevaluated 1.00 Each CountCULTURAL-SITES 1503 Eligible 1.00 Each CountCULTURAL-SITES 1503 Eligible 2.00 Each CountCULTURAL-SITES 1503 Potential TCP 1.00 Each CountCULTURAL-SITES 1503.5 Unevaluated 2.00 Each CountCULTURAL-SITES 1504 Eligible 1.00 Each CountCULTURAL-SITES 1504 Eligible 2.00 Each CountCULTURAL-SITES 1504 Potential TCP 1.00 Each CountCULTURAL-SITES 1510 Eligible 3.00 Each CountCULTURAL-SITES 1510 Eligible 1.00 Each CountCULTURAL-SITES 1510 Potential TCP 1.00 Each CountCULTURAL-SITES 1510 Unevaluated 4.00 Each CountCULTURAL-SITES 1520 Eligible 7.00 Each CountCULTURAL-SITES 1520 Eligible 4.00 Each CountCULTURAL-SITES 1520 Eligible 3.00 Each CountCULTURAL-SITES 1520 Eligible 32.00 Each CountCULTURAL-SITES 1520 Eligible 23.00 Each CountCULTURAL-SITES 1520 Eligible 13.00 Each Count

Page 43: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

CULTURAL-SITES 1520 Potential TCP 3.00 Each CountCULTURAL-SITES 1520 Potential TCP 32.00 Each CountCULTURAL-SITES 1520 Potential TCP 4.00 Each CountCULTURAL-SITES 1520 Unevaluated 2.00 Each CountCULTURAL-SITES 1520 Unevaluated 5.00 Each CountCULTURAL-SITES 1520 Unevaluated 13.00 Each CountCULTURAL-SITES 1530 Potential TCP 1.00 Each CountCULTURAL-SITES 1530 Unevaluated 1.00 Each CountCULTURAL-SITES 1540.1 Potential TCP 1.00 Each CountCULTURAL-SITES 1540.1 Potential TCP 2.00 Each CountCULTURAL-SITES 1540.1 Unevaluated 13.00 Each CountCULTURAL-SITES 1540.1 Unevaluated 2.00 Each CountCULTURAL-SITES 1540.1 Unevaluated 1.00 Each CountCULTURAL-SITES 1540.1 Unevaluated 6.00 Each CountCULTURAL-SITES 1540.2 Eligible 2.00 Each CountCULTURAL-SITES 1540.2 Eligible 4.00 Each CountCULTURAL-SITES 1540.2 Eligible 3.00 Each CountCULTURAL-SITES 1540.2 Potential TCP 2.00 Each CountCULTURAL-SITES 1540.2 Potential TCP 1.00 Each CountCULTURAL-SITES 1540.2 Potential TCP 6.00 Each CountCULTURAL-SITES 1540.2 Potential TCP 8.00 Each CountCULTURAL-SITES 1540.2 Potential TCP 13.00 Each CountCULTURAL-SITES 1540.2 Unevaluated 5.00 Each CountCULTURAL-SITES 1540.2 Unevaluated 13.00 Each CountCULTURAL-SITES 1540.2 Unevaluated 7.00 Each CountCULTURAL-SITES 1540.2 Unevaluated 2.00 Each CountCULTURAL-SITES 1540.2 Unevaluated 1.00 Each CountCULTURAL-SITES 1545 Potential TCP 6.00 Each CountCULTURAL-SITES 1545 Potential TCP 1.00 Each CountCULTURAL-SITES 1545 Unevaluated 4.00 Each CountCULTURAL-SITES 1545 Unevaluated 6.00 Each CountCULTURAL-SITES 1545 Unevaluated 7.00 Each CountCULTURAL-SITES 1545 Unevaluated 1.00 Each CountCULTURAL-SITES 1545 Unevaluated 3.00 Each CountCULTURAL-SITES 1550.1 Potential TCP 2.00 Each CountCULTURAL-SITES 1550.1 Unevaluated 1.00 Each CountCULTURAL-SITES 1550.1 Unevaluated 2.00 Each CountCULTURAL-SITES 1550.2 Unevaluated 3.00 Each CountCULTURAL-SITES 1580 Eligible 2.00 Each CountCULTURAL-SITES 1580 Unevaluated 1.00 Each CountCULTURAL-SITES 1600 Eligible 1.00 Each CountCULTURAL-SITES 1600 Eligible 4.00 Each CountCULTURAL-SITES 1600 Potential TCP 1.00 Each CountCULTURAL-SITES 1600 Unevaluated 2.00 Each CountCULTURAL-SITES 1610 Eligible 1.00 Each Count

Page 44: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

CULTURAL-SITES 1610 Eligible 2.00 Each CountCULTURAL-SITES 1610 Unevaluated 1.00 Each CountCULTURAL-SITES 1620 Unevaluated 1.00 Each CountCULTURAL-SITES 1660 Eligible 1.00 Each CountCULTURAL-SITES 1660 Eligible 43.00 Each CountCULTURAL-SITES 1660 Eligible 5.00 Each CountCULTURAL-SITES 1660 Listed 2.00 Each CountCULTURAL-SITES 1660 Listed 16.00 Each CountCULTURAL-SITES 1660 Potential TCP 1.00 Each CountCULTURAL-SITES 1660 Potential TCP 43.00 Each CountCULTURAL-SITES 1660 Potential TCP 5.00 Each CountCULTURAL-SITES 1660 Potential TCP 16.00 Each CountCULTURAL-SITES 1660 Potential TCP 2.00 Each CountCULTURAL-SITES 1660 Potential TCP 14.00 Each CountCULTURAL-SITES 1660 Unevaluated 1.00 Each CountCULTURAL-SITES 1670 Eligible 5.00 Each CountCULTURAL-SITES 1670 Unevaluated 1.00 Each CountCULTURAL-SITES 1680 Eligible 1.00 Each CountCULTURAL-SITES 1680 Eligible 3.00 Each CountCULTURAL-SITES 1680 Potential TCP 3.00 Each CountCULTURAL-SITES 1680 Potential TCP 1.00 Each CountCULTURAL-SITES 1690 Eligible 1.00 Each CountCULTURAL-SITES 1700 Unevaluated 2.00 Each CountCULTURAL-SITES 1700 Unevaluated 1.00 Each CountCULTURAL-SITES 1710 Eligible 8.00 Each CountCULTURAL-SITES 1710 Eligible 2.00 Each CountCULTURAL-SITES 1710 Eligible 14.00 Each CountCULTURAL-SITES 1710 Eligible 43.00 Each CountCULTURAL-SITES 1710 Eligible 1.00 Each CountCULTURAL-SITES 1710 Eligible 65.00 Each CountCULTURAL-SITES 1710 Potential TCP 14.00 Each CountCULTURAL-SITES 1710 Potential TCP 1.00 Each CountCULTURAL-SITES 1710 Unevaluated 1.00 Each CountCULTURAL-SITES 1710 Unevaluated 2.00 Each CountCULTURAL-SITES 1730 Eligible 1.00 Each CountCULTURAL-SITES 1730 Eligible 29.00 Each CountCULTURAL-SITES 1740 Eligible 15.00 Each CountCULTURAL-SITES 1740 Eligible 8.00 Each CountCULTURAL-SITES 1740 Eligible 2.00 Each CountCULTURAL-SITES 1740 Potential TCP 15.00 Each CountCULTURAL-SITES 1740 Potential TCP 8.00 Each CountCULTURAL-SITES 1740 Potential TCP 2.00 Each CountCULTURAL-SITES 1740 Potential TCP 9.00 Each CountCULTURAL-SITES 1740 Unevaluated 2.00 Each CountCULTURAL-SITES 1740 Unevaluated 1.00 Each Count

Page 45: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

CULTURAL-SITES 1750 Eligible 35.00 Each CountCULTURAL-SITES 1750 Potential TCP 21.00 Each CountCULTURAL-SITES 1760 Eligible 13.00 Each CountCULTURAL-SITES 1760 Eligible 24.00 Each CountCULTURAL-SITES 1760 Eligible 78.00 Each CountCULTURAL-SITES 1760 Potential TCP 22.00 Each CountCULTURAL-SITES 1771 Eligible 19.00 Each CountCULTURAL-SITES 1771 Eligible 4.00 Each CountCULTURAL-SITES 1771 Eligible 25.00 Each CountCULTURAL-SITES 1771 Potential TCP 31.00 Each CountCULTURAL-SITES 1771 Unevaluated 6.00 Each CountCULTURAL-SITES 1780 Eligible 4.00 Each CountCULTURAL-SITES 1780 Eligible 2.00 Each CountCULTURAL-SITES 1790 Eligible 4.00 Each CountCULTURAL-SITES 1790 Eligible 83.00 Each CountCULTURAL-SITES 1790 Eligible 41.00 Each CountCULTURAL-SITES 1790 Unevaluated 1.00 Each CountCULTURAL-SITES 1800 Eligible 4.00 Each CountCULTURAL-SITES 1810 Eligible 4.00 Each CountCULTURAL-SITES 1820 Eligible 4.00 Each CountCULTURAL-SVYPCT 1030 EXISTING SURVEY 0.18 Percent CountCULTURAL-SVYPCT 1040 EXISTING SURVEY 0.62 Percent CountCULTURAL-SVYPCT 1100 EXISTING SURVEY 0.01 Percent CountCULTURAL-SVYPCT 1101 EXISTING SURVEY 0.06 Percent CountCULTURAL-SVYPCT 1103 EXISTING SURVEY 0.01 Percent CountCULTURAL-SVYPCT 1104 EXISTING SURVEY 0.02 Percent CountCULTURAL-SVYPCT 1105 EXISTING SURVEY 0.02 Percent CountCULTURAL-SVYPCT 1106 EXISTING SURVEY 0.01 Percent CountCULTURAL-SVYPCT 1110 EXISTING SURVEY 0.42 Percent CountCULTURAL-SVYPCT 1115 EXISTING SURVEY 0.12 Percent CountCULTURAL-SVYPCT 1116 EXISTING SURVEY 0.09 Percent CountCULTURAL-SVYPCT 1120 EXISTING SURVEY 0.11 Percent CountCULTURAL-SVYPCT 1120.2 EXISTING SURVEY 0.02 Percent CountCULTURAL-SVYPCT 1180 EXISTING SURVEY 0.10 Percent CountCULTURAL-SVYPCT 1187 EXISTING SURVEY 0.06 Percent CountCULTURAL-SVYPCT 1190 EXISTING SURVEY 0.08 Percent CountCULTURAL-SVYPCT 1210 EXISTING SURVEY 0.25 Percent CountCULTURAL-SVYPCT 1211 EXISTING SURVEY 0.74 Percent CountCULTURAL-SVYPCT 1212 EXISTING SURVEY 0.38 Percent CountCULTURAL-SVYPCT 1214 EXISTING SURVEY 0.68 Percent CountCULTURAL-SVYPCT 1215 EXISTING SURVEY 0.25 Percent CountCULTURAL-SVYPCT 1215.05 EXISTING SURVEY 0.34 Percent CountCULTURAL-SVYPCT 1217.01 EXISTING SURVEY 0.36 Percent CountCULTURAL-SVYPCT 1217.051 EXISTING SURVEY 0.05 Percent CountCULTURAL-SVYPCT 1217.052 EXISTING SURVEY 0.17 Percent Count

Page 46: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

CULTURAL-SVYPCT 1217.1 EXISTING SURVEY 0.14 Percent CountCULTURAL-SVYPCT 1217.15 EXISTING SURVEY 0.09 Percent CountCULTURAL-SVYPCT 1218 EXISTING SURVEY 0.04 Percent CountCULTURAL-SVYPCT 1219.2 EXISTING SURVEY 0.04 Percent CountCULTURAL-SVYPCT 1219.3 EXISTING SURVEY 0.01 Percent CountCULTURAL-SVYPCT 1219.45 EXISTING SURVEY 0.09 Percent CountCULTURAL-SVYPCT 1219.5 EXISTING SURVEY 0.01 Percent CountCULTURAL-SVYPCT 1219.6 EXISTING SURVEY 0.03 Percent CountCULTURAL-SVYPCT 1220 EXISTING SURVEY 0.21 Percent CountCULTURAL-SVYPCT 1222.05 EXISTING SURVEY 0.10 Percent CountCULTURAL-SVYPCT 1222.3 EXISTING SURVEY 0.16 Percent CountCULTURAL-SVYPCT 1223 EXISTING SURVEY 0.22 Percent CountCULTURAL-SVYPCT 1225.2 EXISTING SURVEY 0.07 Percent CountCULTURAL-SVYPCT 1270 EXISTING SURVEY 0.10 Percent CountCULTURAL-SVYPCT 1310 EXISTING SURVEY 0.15 Percent CountCULTURAL-SVYPCT 1320.05 EXISTING SURVEY 0.11 Percent CountCULTURAL-SVYPCT 1320.15 EXISTING SURVEY 0.01 Percent CountCULTURAL-SVYPCT 1320.2 EXISTING SURVEY 0.01 Percent CountCULTURAL-SVYPCT 1321 EXISTING SURVEY 0.01 Percent CountCULTURAL-SVYPCT 1322 EXISTING SURVEY 0.07 Percent CountCULTURAL-SVYPCT 1322.5 EXISTING SURVEY 0.07 Percent CountCULTURAL-SVYPCT 1324.2 EXISTING SURVEY 0.02 Percent CountCULTURAL-SVYPCT 1324.4 EXISTING SURVEY 0.08 Percent CountCULTURAL-SVYPCT 1325 EXISTING SURVEY 0.04 Percent CountCULTURAL-SVYPCT 1325.1 EXISTING SURVEY 0.14 Percent CountCULTURAL-SVYPCT 1330.1 EXISTING SURVEY 0.22 Percent CountCULTURAL-SVYPCT 1340 EXISTING SURVEY 0.10 Percent CountCULTURAL-SVYPCT 1350 EXISTING SURVEY 0.06 Percent CountCULTURAL-SVYPCT 1360 EXISTING SURVEY 0.34 Percent CountCULTURAL-SVYPCT 1370 EXISTING SURVEY 0.03 Percent CountCULTURAL-SVYPCT 1380 EXISTING SURVEY 0.15 Percent CountCULTURAL-SVYPCT 1390 EXISTING SURVEY 0.27 Percent CountCULTURAL-SVYPCT 1400 EXISTING SURVEY 0.12 Percent CountCULTURAL-SVYPCT 1410 EXISTING SURVEY 0.23 Percent CountCULTURAL-SVYPCT 1420 EXISTING SURVEY 0.75 Percent CountCULTURAL-SVYPCT 1430 EXISTING SURVEY 0.11 Percent CountCULTURAL-SVYPCT 1440 EXISTING SURVEY 0.54 Percent CountCULTURAL-SVYPCT 1450 EXISTING SURVEY 0.11 Percent CountCULTURAL-SVYPCT 1460 EXISTING SURVEY 0.10 Percent CountCULTURAL-SVYPCT 1470 EXISTING SURVEY 0.00 Percent CountCULTURAL-SVYPCT 1480 EXISTING SURVEY 0.33 Percent CountCULTURAL-SVYPCT 1490 EXISTING SURVEY 0.14 Percent CountCULTURAL-SVYPCT 1490.05 EXISTING SURVEY 0.06 Percent CountCULTURAL-SVYPCT 1495 EXISTING SURVEY 0.09 Percent CountCULTURAL-SVYPCT 1500 EXISTING SURVEY 0.31 Percent Count

Page 47: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

CULTURAL-SVYPCT 1500.02 EXISTING SURVEY 0.37 Percent CountCULTURAL-SVYPCT 1500.05 EXISTING SURVEY 0.11 Percent CountCULTURAL-SVYPCT 1501.1 EXISTING SURVEY 0.09 Percent CountCULTURAL-SVYPCT 1501.15 EXISTING SURVEY 0.02 Percent CountCULTURAL-SVYPCT 1502.5 EXISTING SURVEY 0.24 Percent CountCULTURAL-SVYPCT 1503 EXISTING SURVEY 0.51 Percent CountCULTURAL-SVYPCT 1503.5 EXISTING SURVEY 0.11 Percent CountCULTURAL-SVYPCT 1504 EXISTING SURVEY 0.64 Percent CountCULTURAL-SVYPCT 1505 EXISTING SURVEY 0.51 Percent CountCULTURAL-SVYPCT 1506 EXISTING SURVEY 0.03 Percent CountCULTURAL-SVYPCT 1510 EXISTING SURVEY 0.05 Percent CountCULTURAL-SVYPCT 1520 EXISTING SURVEY 0.15 Percent CountCULTURAL-SVYPCT 1530 EXISTING SURVEY 0.99 Percent CountCULTURAL-SVYPCT 1540.1 EXISTING SURVEY 0.71 Percent CountCULTURAL-SVYPCT 1540.2 EXISTING SURVEY 0.84 Percent CountCULTURAL-SVYPCT 1545 EXISTING SURVEY 0.34 Percent CountCULTURAL-SVYPCT 1550.1 EXISTING SURVEY 0.18 Percent CountCULTURAL-SVYPCT 1550.2 EXISTING SURVEY 0.27 Percent CountCULTURAL-SVYPCT 1560 EXISTING SURVEY 0.32 Percent CountCULTURAL-SVYPCT 1570 EXISTING SURVEY 0.35 Percent CountCULTURAL-SVYPCT 1580 EXISTING SURVEY 0.19 Percent CountCULTURAL-SVYPCT 1590 EXISTING SURVEY 0.61 Percent CountCULTURAL-SVYPCT 1600 EXISTING SURVEY 0.17 Percent CountCULTURAL-SVYPCT 1610 EXISTING SURVEY 0.81 Percent CountCULTURAL-SVYPCT 1620 EXISTING SURVEY 0.15 Percent CountCULTURAL-SVYPCT 1630 EXISTING SURVEY 0.22 Percent CountCULTURAL-SVYPCT 1640 EXISTING SURVEY 0.24 Percent CountCULTURAL-SVYPCT 1650 EXISTING SURVEY 0.20 Percent CountCULTURAL-SVYPCT 1660 EXISTING SURVEY 0.32 Percent CountCULTURAL-SVYPCT 1670 EXISTING SURVEY 0.07 Percent CountCULTURAL-SVYPCT 1680 EXISTING SURVEY 0.34 Percent CountCULTURAL-SVYPCT 1690 EXISTING SURVEY 0.21 Percent CountCULTURAL-SVYPCT 1700 EXISTING SURVEY 0.75 Percent CountCULTURAL-SVYPCT 1710 EXISTING SURVEY 0.42 Percent CountCULTURAL-SVYPCT 1730 EXISTING SURVEY 0.11 Percent CountCULTURAL-SVYPCT 1740 EXISTING SURVEY 0.16 Percent CountCULTURAL-SVYPCT 1750 EXISTING SURVEY 1.00 Percent CountCULTURAL-SVYPCT 1760 EXISTING SURVEY 0.23 Percent CountCULTURAL-SVYPCT 1771 EXISTING SURVEY 0.20 Percent CountCULTURAL-SVYPCT 1772 EXISTING SURVEY 0.71 Percent CountCULTURAL-SVYPCT 1780 EXISTING SURVEY 0.31 Percent CountCULTURAL-SVYPCT 1790 EXISTING SURVEY 0.90 Percent CountCULTURAL-SVYPCT 1800 EXISTING SURVEY 0.09 Percent CountCULTURAL-SVYPCT 1810 EXISTING SURVEY 0.17 Percent CountCULTURAL-SVYPCT 1820 EXISTING SURVEY 0.12 Percent Count

Page 48: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

CULTURAL-SVYPCT 1830 EXISTING SURVEY 0.36 Percent CountDTORT 1502.5 USFWS-Critical Habitat 223.47 Acres Construction DisturbanceDTORT 1502.5 USFWS-Critical Habitat 73.72 Acres Operation DisturbanceDTORT 1502.5 USFWS-Section 7 Potential Habitat 104.35 Acres Construction DisturbanceDTORT 1502.5 USFWS-Section 7 Potential Habitat 41.75 Acres Operation DisturbanceDTORT 1502.5 USGS-Greater Than 0.6 304.82 Acres Construction DisturbanceDTORT 1502.5 USGS-Greater Than 0.6 90.79 Acres Operation DisturbanceDTORT 1510 USFWS-Critical Habitat 17.07 Acres Construction DisturbanceDTORT 1510 USFWS-Critical Habitat 5.66 Acres Operation DisturbanceDTORT 1510 USFWS-Section 7 Potential Habitat 187.02 Acres Construction DisturbanceDTORT 1510 USFWS-Section 7 Potential Habitat 56.79 Acres Operation DisturbanceDTORT 1510 USGS-Greater Than 0.6 138.04 Acres Construction DisturbanceDTORT 1510 USGS-Greater Than 0.6 44.12 Acres Operation DisturbanceDTORT 1520 USFWS-Critical Habitat 633.11 Acres Construction DisturbanceDTORT 1520 USFWS-Critical Habitat 129.61 Acres Operation DisturbanceDTORT 1520 USFWS-Section 7 Potential Habitat 837.63 Acres Construction DisturbanceDTORT 1520 USFWS-Section 7 Potential Habitat 172.75 Acres Operation DisturbanceDTORT 1520 USGS-Greater Than 0.6 815.19 Acres Construction DisturbanceDTORT 1520 USGS-Greater Than 0.6 167.01 Acres Operation DisturbanceDTORT 1530 USFWS-Critical Habitat 74.01 Acres Construction DisturbanceDTORT 1530 USFWS-Critical Habitat 15.17 Acres Operation DisturbanceDTORT 1530 USFWS-Section 7 Potential Habitat 86.67 Acres Construction DisturbanceDTORT 1530 USFWS-Section 7 Potential Habitat 18.44 Acres Operation DisturbanceDTORT 1530 USGS-Greater Than 0.6 86.67 Acres Construction DisturbanceDTORT 1530 USGS-Greater Than 0.6 18.44 Acres Operation DisturbanceDTORT 1540.1 USFWS-Critical Habitat 176.79 Acres Construction DisturbanceDTORT 1540.1 USFWS-Critical Habitat 24.29 Acres Operation DisturbanceDTORT 1540.1 USFWS-Section 7 Potential Habitat 254.81 Acres Construction DisturbanceDTORT 1540.1 USFWS-Section 7 Potential Habitat 36.90 Acres Operation DisturbanceDTORT 1540.1 USGS-Greater Than 0.6 254.81 Acres Construction DisturbanceDTORT 1540.1 USGS-Greater Than 0.6 36.90 Acres Operation DisturbanceDTORT 1540.2 USFWS-Section 7 Potential Habitat 228.29 Acres Construction DisturbanceDTORT 1540.2 USFWS-Section 7 Potential Habitat 30.91 Acres Operation DisturbanceDTORT 1540.2 USGS-Greater Than 0.6 228.29 Acres Construction DisturbanceDTORT 1540.2 USGS-Greater Than 0.6 30.91 Acres Operation DisturbanceDTORT 1545 USFWS-Section 7 Potential Habitat 54.29 Acres Construction DisturbanceDTORT 1545 USFWS-Section 7 Potential Habitat 8.98 Acres Operation DisturbanceDTORT 1545 USGS-Greater Than 0.6 54.29 Acres Construction DisturbanceDTORT 1545 USGS-Greater Than 0.6 8.98 Acres Operation DisturbanceDTORT 1550.1 USFWS-Critical Habitat 79.93 Acres Construction DisturbanceDTORT 1550.1 USFWS-Critical Habitat 27.90 Acres Operation DisturbanceDTORT 1550.1 USFWS-Section 7 Potential Habitat 351.56 Acres Construction DisturbanceDTORT 1550.1 USFWS-Section 7 Potential Habitat 111.28 Acres Operation DisturbanceDTORT 1550.1 USGS-Greater Than 0.6 351.56 Acres Construction DisturbanceDTORT 1550.1 USGS-Greater Than 0.6 111.28 Acres Operation Disturbance

Page 49: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

DTORT 1550.2 USFWS-Section 7 Potential Habitat 145.14 Acres Construction DisturbanceDTORT 1550.2 USFWS-Section 7 Potential Habitat 32.36 Acres Operation DisturbanceDTORT 1550.2 USGS-Greater Than 0.6 145.05 Acres Construction DisturbanceDTORT 1550.2 USGS-Greater Than 0.6 32.34 Acres Operation DisturbanceDTORT 1560 USFWS-Section 7 Potential Habitat 143.32 Acres Construction DisturbanceDTORT 1560 USFWS-Section 7 Potential Habitat 29.28 Acres Operation DisturbanceDTORT 1560 USGS-Greater Than 0.6 143.32 Acres Construction DisturbanceDTORT 1560 USGS-Greater Than 0.6 29.28 Acres Operation DisturbanceDTORT 1570 USFWS-Section 7 Potential Habitat 122.38 Acres Construction DisturbanceDTORT 1570 USFWS-Section 7 Potential Habitat 24.01 Acres Operation DisturbanceDTORT 1570 USGS-Greater Than 0.6 122.38 Acres Construction DisturbanceDTORT 1570 USGS-Greater Than 0.6 24.01 Acres Operation DisturbanceDTORT 1580 USFWS-Section 7 Potential Habitat 53.14 Acres Construction DisturbanceDTORT 1580 USFWS-Section 7 Potential Habitat 8.78 Acres Operation DisturbanceDTORT 1580 USGS-Greater Than 0.6 52.67 Acres Construction DisturbanceDTORT 1580 USGS-Greater Than 0.6 8.69 Acres Operation DisturbanceDTORT 1590 USFWS-Section 7 Potential Habitat 80.98 Acres Construction DisturbanceDTORT 1590 USFWS-Section 7 Potential Habitat 11.55 Acres Operation DisturbanceDTORT 1590 USGS-Greater Than 0.6 80.98 Acres Construction DisturbanceDTORT 1590 USGS-Greater Than 0.6 11.55 Acres Operation DisturbanceDTORT 1600 USFWS-Section 7 Potential Habitat 88.22 Acres Construction DisturbanceDTORT 1600 USFWS-Section 7 Potential Habitat 20.88 Acres Operation DisturbanceDTORT 1600 USGS-Greater Than 0.6 87.47 Acres Construction DisturbanceDTORT 1600 USGS-Greater Than 0.6 20.45 Acres Operation DisturbanceDTORT 1610 USFWS-Critical Habitat 24.94 Acres Construction DisturbanceDTORT 1610 USFWS-Critical Habitat 5.13 Acres Operation DisturbanceDTORT 1610 USFWS-Section 7 Potential Habitat 270.79 Acres Construction DisturbanceDTORT 1610 USFWS-Section 7 Potential Habitat 51.59 Acres Operation DisturbanceDTORT 1610 USGS-Greater Than 0.6 270.59 Acres Construction DisturbanceDTORT 1610 USGS-Greater Than 0.6 51.54 Acres Operation DisturbanceDTORT 1620 USFWS-Section 7 Potential Habitat 70.81 Acres Construction DisturbanceDTORT 1620 USFWS-Section 7 Potential Habitat 15.36 Acres Operation DisturbanceDTORT 1620 USGS-Greater Than 0.6 70.78 Acres Construction DisturbanceDTORT 1620 USGS-Greater Than 0.6 15.35 Acres Operation DisturbanceDTORT 1630 USFWS-Section 7 Potential Habitat 47.49 Acres Construction DisturbanceDTORT 1630 USFWS-Section 7 Potential Habitat 10.21 Acres Operation DisturbanceDTORT 1630 USGS-Greater Than 0.6 36.37 Acres Construction DisturbanceDTORT 1630 USGS-Greater Than 0.6 7.98 Acres Operation DisturbanceDTORT 1640 USFWS-Section 7 Potential Habitat 59.68 Acres Construction DisturbanceDTORT 1640 USFWS-Section 7 Potential Habitat 8.89 Acres Operation DisturbanceDTORT 1640 USGS-Greater Than 0.6 48.84 Acres Construction DisturbanceDTORT 1640 USGS-Greater Than 0.6 7.17 Acres Operation DisturbanceDTORT 1650 USFWS-Section 7 Potential Habitat 51.11 Acres Construction DisturbanceDTORT 1650 USFWS-Section 7 Potential Habitat 8.17 Acres Operation DisturbanceDTORT 1650 USGS-Greater Than 0.6 41.78 Acres Construction Disturbance

Page 50: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

DTORT 1650 USGS-Greater Than 0.6 6.72 Acres Operation DisturbanceDTORT 1660 USFWS-Section 7 Potential Habitat 126.77 Acres Construction DisturbanceDTORT 1660 USFWS-Section 7 Potential Habitat 31.45 Acres Operation DisturbanceDTORT 1660 USGS-Greater Than 0.6 109.40 Acres Construction DisturbanceDTORT 1660 USGS-Greater Than 0.6 27.66 Acres Operation DisturbanceDTORT 1670 USFWS-Section 7 Potential Habitat 59.87 Acres Construction DisturbanceDTORT 1670 USFWS-Section 7 Potential Habitat 16.78 Acres Operation DisturbanceDTORT 1670 USGS-Greater Than 0.6 0.67 Acres Construction DisturbanceDTORT 1670 USGS-Greater Than 0.6 0.28 Acres Operation DisturbanceDTORT 1680 USFWS-Section 7 Potential Habitat 75.29 Acres Construction DisturbanceDTORT 1680 USFWS-Section 7 Potential Habitat 20.48 Acres Operation DisturbanceDTORT 1680 USGS-Greater Than 0.6 71.79 Acres Construction DisturbanceDTORT 1680 USGS-Greater Than 0.6 19.84 Acres Operation DisturbanceDTORT 1690 USFWS-Section 7 Potential Habitat 98.21 Acres Construction DisturbanceDTORT 1690 USFWS-Section 7 Potential Habitat 26.57 Acres Operation DisturbanceDTORT 1690 USGS-Greater Than 0.6 84.56 Acres Construction DisturbanceDTORT 1690 USGS-Greater Than 0.6 23.30 Acres Operation DisturbanceDTORT 1700 USFWS-Section 7 Potential Habitat 33.15 Acres Construction DisturbanceDTORT 1700 USFWS-Section 7 Potential Habitat 5.13 Acres Operation DisturbanceDTORT 1700 USGS-Greater Than 0.6 33.15 Acres Construction DisturbanceDTORT 1700 USGS-Greater Than 0.6 5.13 Acres Operation DisturbanceDTORT 1710 USFWS-Section 7 Potential Habitat 116.68 Acres Construction DisturbanceDTORT 1710 USFWS-Section 7 Potential Habitat 33.71 Acres Operation DisturbanceDTORT 1710 USGS-Greater Than 0.6 41.75 Acres Construction DisturbanceDTORT 1710 USGS-Greater Than 0.6 13.74 Acres Operation DisturbanceDTORT 1730 USFWS-Section 7 Potential Habitat 165.18 Acres Construction DisturbanceDTORT 1730 USFWS-Section 7 Potential Habitat 58.04 Acres Operation DisturbanceDTORT 1730 USGS-Greater Than 0.6 123.89 Acres Construction DisturbanceDTORT 1730 USGS-Greater Than 0.6 43.03 Acres Operation DisturbanceDTORT 1740 USFWS-Section 7 Potential Habitat 78.47 Acres Construction DisturbanceDTORT 1740 USFWS-Section 7 Potential Habitat 28.83 Acres Operation DisturbanceDTORT 1740 USGS-Greater Than 0.6 78.08 Acres Construction DisturbanceDTORT 1740 USGS-Greater Than 0.6 28.57 Acres Operation DisturbanceDTORT 1750 USFWS-Section 7 Potential Habitat 5.06 Acres Construction DisturbanceDTORT 1750 USFWS-Section 7 Potential Habitat 1.01 Acres Operation DisturbanceDTORT 1750 USGS-Greater Than 0.6 4.84 Acres Construction DisturbanceDTORT 1750 USGS-Greater Than 0.6 0.96 Acres Operation DisturbanceDTORT 1760 USFWS-Section 7 Potential Habitat 125.88 Acres Construction DisturbanceDTORT 1760 USFWS-Section 7 Potential Habitat 27.95 Acres Operation DisturbanceDTORT 1760 USGS-Greater Than 0.6 114.15 Acres Construction DisturbanceDTORT 1760 USGS-Greater Than 0.6 25.15 Acres Operation DisturbanceDTORT 1771 USFWS-Critical Habitat 42.55 Acres Construction DisturbanceDTORT 1771 USFWS-Critical Habitat 8.96 Acres Operation DisturbanceDTORT 1771 USFWS-Section 7 Potential Habitat 294.11 Acres Construction DisturbanceDTORT 1771 USFWS-Section 7 Potential Habitat 46.65 Acres Operation Disturbance

Page 51: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

DTORT 1771 USGS-Greater Than 0.6 268.54 Acres Construction DisturbanceDTORT 1771 USGS-Greater Than 0.6 43.98 Acres Operation DisturbanceDTORT 1772 USFWS-Section 7 Potential Habitat 3.91 Acres Construction DisturbanceDTORT 1772 USFWS-Section 7 Potential Habitat 0.46 Acres Operation DisturbanceDTORT 1772 USGS-Greater Than 0.6 3.88 Acres Construction DisturbanceDTORT 1772 USGS-Greater Than 0.6 0.45 Acres Operation DisturbanceDTORT 1780 USFWS-Section 7 Potential Habitat 68.59 Acres Construction DisturbanceDTORT 1780 USFWS-Section 7 Potential Habitat 16.64 Acres Operation DisturbanceDTORT 1780 USGS-Greater Than 0.6 67.08 Acres Construction DisturbanceDTORT 1780 USGS-Greater Than 0.6 15.92 Acres Operation DisturbanceDTORT 1790 USFWS-Section 7 Potential Habitat 179.51 Acres Construction DisturbanceDTORT 1790 USFWS-Section 7 Potential Habitat 31.66 Acres Operation DisturbanceDTORT 1790 USGS-Greater Than 0.6 173.02 Acres Construction DisturbanceDTORT 1790 USGS-Greater Than 0.6 29.01 Acres Operation DisturbanceDTORT 1800 USFWS-Section 7 Potential Habitat 15.89 Acres Construction DisturbanceDTORT 1800 USFWS-Section 7 Potential Habitat 1.55 Acres Operation DisturbanceDTORT 1800 USGS-Greater Than 0.6 15.89 Acres Construction DisturbanceDTORT 1800 USGS-Greater Than 0.6 1.55 Acres Operation DisturbanceDTORT 1810 USFWS-Section 7 Potential Habitat 107.97 Acres Construction DisturbanceDTORT 1810 USFWS-Section 7 Potential Habitat 19.36 Acres Operation DisturbanceDTORT 1810 USGS-Greater Than 0.6 107.07 Acres Construction DisturbanceDTORT 1810 USGS-Greater Than 0.6 19.18 Acres Operation DisturbanceDTORT 1820 USFWS-Section 7 Potential Habitat 78.99 Acres Construction DisturbanceDTORT 1820 USFWS-Section 7 Potential Habitat 10.77 Acres Operation DisturbanceDTORT 1820 USGS-Greater Than 0.6 76.09 Acres Construction DisturbanceDTORT 1820 USGS-Greater Than 0.6 9.82 Acres Operation DisturbanceDTORT 1830 USFWS-Section 7 Potential Habitat 10.78 Acres Construction DisturbanceDTORT 1830 USFWS-Section 7 Potential Habitat 0.77 Acres Operation DisturbanceDTORT 1830 USGS-Greater Than 0.6 10.77 Acres Construction DisturbanceDTORT 1830 USGS-Greater Than 0.6 0.77 Acres Operation DisturbanceFM 1217.01 $ $ $ $ $RN 0.01 Acres Construction DisturbanceFM 1217.01 $ $ $ $ $RN 0.00 Acres Operation DisturbanceFM 1217.01 $ $ $ $ $SPM 0.00 Acres Construction DisturbanceFM 1217.01 $ $ $ $ $SPM 0.00 Acres Operation DisturbanceFM 1217.01 $ $d$d$ $RN 0.00 Acres Construction DisturbanceFM 1217.01 $ $d$d$ $RN 0.00 Acres Operation DisturbanceFM 1217.01 $ $d$d$ $SPM 0.00 Acres Construction DisturbanceFM 1217.01 $ $d$d$ $SPM 0.00 Acres Operation DisturbanceFM 1217.01 $ $e$e$ $RN 0.00 Acres Construction DisturbanceFM 1217.01 $ $e$e$ $RN 0.00 Acres Operation DisturbanceFM 1217.01 $ $e$e$ $SPM 0.00 Acres Construction DisturbanceFM 1217.01 $ $e$e$ $SPM 0.00 Acres Operation DisturbanceFM 1217.01 $ $n$n$ $RN 0.00 Acres Construction DisturbanceFM 1217.01 $ $n$n$ $RN 0.00 Acres Operation DisturbanceFM 1217.01 $ $n$n$ $SPM 0.00 Acres Construction Disturbance

Page 52: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

FM 1217.01 $ $n$n$ $SPM 0.00 Acres Operation DisturbanceFM 1217.01 0401009$ $ $ $ $ 0.00 Acres Construction DisturbanceFM 1217.01 0401009$ $ $ $ $ 0.00 Acres Operation DisturbanceFM 1217.01 0401009$ $ $ $ $RN 0.00 Acres Construction DisturbanceFM 1217.01 0401009$ $ $ $ $RN 0.00 Acres Operation DisturbanceFM 1217.01 0401009$ $d$d$ $RN 0.05 Acres Construction DisturbanceFM 1217.01 0401009$ $d$d$ $RN 0.01 Acres Operation DisturbanceFM 1217.01 0401009$ $e$e$ $RN 0.00 Acres Construction DisturbanceFM 1217.01 0401009$ $e$e$ $RN 0.00 Acres Operation DisturbanceFM 1217.052 $ $ $ $ $RM 0.00 Acres Construction DisturbanceFM 1217.052 $ $ $ $ $RM 0.00 Acres Operation DisturbanceFM 1217.052 $ $ $ $ $RN 0.00 Acres Construction DisturbanceFM 1217.052 $ $ $ $ $RN 0.00 Acres Operation DisturbanceFM 1217.052 $ $ $ $ $SPM 0.00 Acres Construction DisturbanceFM 1217.052 $ $ $ $ $SPM 0.00 Acres Operation DisturbanceFM 1217.052 $ $10$UPPER SPANISH FORK CANYON$ $ 15.66 Acres Construction DisturbanceFM 1217.052 $ $10$UPPER SPANISH FORK CANYON$ $ 4.80 Acres Operation DisturbanceFM 1217.052 $ $10$UPPER SPANISH FORK CANYON$ $RM 0.00 Acres Construction DisturbanceFM 1217.052 $ $10$UPPER SPANISH FORK CANYON$ $RM 0.00 Acres Operation DisturbanceFM 1217.052 $ $10$UPPER SPANISH FORK CANYON$ $RN 0.00 Acres Construction DisturbanceFM 1217.052 $ $10$UPPER SPANISH FORK CANYON$ $RN 0.00 Acres Operation DisturbanceFM 1217.052 $ $10$UPPER SPANISH FORK CANYON$ $SPM 0.00 Acres Construction DisturbanceFM 1217.052 $ $10$UPPER SPANISH FORK CANYON$ $SPM 0.00 Acres Operation DisturbanceFM 1217.052 $ $10$UPPER SPANISH FORK CANYON$3.3$ 0.00 Acres Construction DisturbanceFM 1217.052 $ $10$UPPER SPANISH FORK CANYON$3.3$ 0.00 Acres Operation DisturbanceFM 1217.052 $ $10$UPPER SPANISH FORK CANYON$3.3$RM 62.87 Acres Construction DisturbanceFM 1217.052 $ $10$UPPER SPANISH FORK CANYON$3.3$RM 17.72 Acres Operation DisturbanceFM 1217.052 $ $10$UPPER SPANISH FORK CANYON$3.3$RN 2.72 Acres Construction DisturbanceFM 1217.052 $ $10$UPPER SPANISH FORK CANYON$3.3$RN 1.75 Acres Operation DisturbanceFM 1217.052 $ $10$UPPER SPANISH FORK CANYON$3.3$SPM 10.16 Acres Construction DisturbanceFM 1217.052 $ $10$UPPER SPANISH FORK CANYON$3.3$SPM 6.30 Acres Operation DisturbanceFM 1217.052 $ $10$UPPER SPANISH FORK CANYON$4.4$ 0.00 Acres Construction DisturbanceFM 1217.052 $ $10$UPPER SPANISH FORK CANYON$4.4$ 0.00 Acres Operation DisturbanceFM 1217.052 $ $10$UPPER SPANISH FORK CANYON$4.4$RM 6.44 Acres Construction DisturbanceFM 1217.052 $ $10$UPPER SPANISH FORK CANYON$4.4$RM 1.65 Acres Operation DisturbanceFM 1217.052 $ $10$UPPER SPANISH FORK CANYON$8.2$ 0.00 Acres Construction DisturbanceFM 1217.052 $ $10$UPPER SPANISH FORK CANYON$8.2$ 0.00 Acres Operation DisturbanceFM 1217.052 $ $10$UPPER SPANISH FORK CANYON$8.2$RM 17.12 Acres Construction DisturbanceFM 1217.052 $ $10$UPPER SPANISH FORK CANYON$8.2$RM 4.56 Acres Operation DisturbanceFM 1217.052 $ $5$WHITE RIVER$ $ 0.00 Acres Construction DisturbanceFM 1217.052 $ $5$WHITE RIVER$ $ 0.00 Acres Operation DisturbanceFM 1217.052 $ $5$WHITE RIVER$3.1$RN 1.60 Acres Construction DisturbanceFM 1217.052 $ $5$WHITE RIVER$3.1$RN 1.11 Acres Operation DisturbanceFM 1217.052 $ $5$WHITE RIVER$3.3$RN 0.83 Acres Construction DisturbanceFM 1217.052 $ $5$WHITE RIVER$3.3$RN 0.57 Acres Operation Disturbance

Page 53: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

FM 1217.052 Tie Fork$ $ $ $ $ 0.00 Acres Construction DisturbanceFM 1217.052 Tie Fork$ $ $ $ $ 0.00 Acres Operation DisturbanceFM 1217.052 Tie Fork$ $ $ $ $RM 0.00 Acres Construction DisturbanceFM 1217.052 Tie Fork$ $ $ $ $RM 0.00 Acres Operation DisturbanceFM 1217.052 Tie Fork$ $10$UPPER SPANISH FORK CANYON$3.3$RM 0.03 Acres Construction DisturbanceFM 1217.052 Tie Fork$ $10$UPPER SPANISH FORK CANYON$3.3$RM 0.02 Acres Operation DisturbanceFM 1217.052 Tie Fork$ $10$UPPER SPANISH FORK CANYON$8.2$RM 0.01 Acres Construction DisturbanceFM 1217.052 Tie Fork$ $10$UPPER SPANISH FORK CANYON$8.2$RM 0.00 Acres Operation DisturbanceFM 1217.15 $ $ $ $ $RN 0.00 Acres Construction DisturbanceFM 1217.15 $ $ $ $ $RN 0.00 Acres Operation DisturbanceFM 1217.15 $ $ $ $ $SPM 0.00 Acres Construction DisturbanceFM 1217.15 $ $ $ $ $SPM 0.00 Acres Operation DisturbanceFM 1217.15 $ $DRS$DRS$Flat Canyon Campground$R 0.01 Acres Construction DisturbanceFM 1217.15 $ $DRS$DRS$Flat Canyon Campground$R 0.01 Acres Operation DisturbanceFM 1217.15 $ $DRS$DRS$Flat Canyon Campground$SPNM 0.02 Acres Construction DisturbanceFM 1217.15 $ $DRS$DRS$Flat Canyon Campground$SPNM 0.01 Acres Operation DisturbanceFM 1217.15 $ $DRS$DRS$Gooseberry Campground$RN 0.23 Acres Construction DisturbanceFM 1217.15 $ $DRS$DRS$Gooseberry Campground$RN 0.14 Acres Operation DisturbanceFM 1217.15 $ $GWR$GWR$ $ 0.00 Acres Construction DisturbanceFM 1217.15 $ $GWR$GWR$ $ 0.00 Acres Operation DisturbanceFM 1217.15 $ $GWR$GWR$ $RN 0.00 Acres Construction DisturbanceFM 1217.15 $ $GWR$GWR$ $RN 0.00 Acres Operation DisturbanceFM 1217.15 $ $GWR$GWR$ $SPM 0.00 Acres Construction DisturbanceFM 1217.15 $ $GWR$GWR$ $SPM 0.00 Acres Operation DisturbanceFM 1217.15 $ $NA$NA$ $ 0.00 Acres Construction DisturbanceFM 1217.15 $ $NA$NA$ $ 0.00 Acres Operation DisturbanceFM 1217.15 $ $PVT/S$PVT/S$ $ 68.96 Acres Construction DisturbanceFM 1217.15 $ $PVT/S$PVT/S$ $ 23.72 Acres Operation DisturbanceFM 1217.15 $ $PVT/S$PVT/S$ $R 0.00 Acres Construction DisturbanceFM 1217.15 $ $PVT/S$PVT/S$ $R 0.00 Acres Operation DisturbanceFM 1217.15 $ $PVT/S$PVT/S$ $RN 0.10 Acres Construction DisturbanceFM 1217.15 $ $PVT/S$PVT/S$ $RN 0.05 Acres Operation DisturbanceFM 1217.15 $ $PVT/S$PVT/S$ $SPM 0.00 Acres Construction DisturbanceFM 1217.15 $ $PVT/S$PVT/S$ $SPM 0.00 Acres Operation DisturbanceFM 1217.15 $ $PVT/S$PVT/S$ $SPNM 0.00 Acres Construction DisturbanceFM 1217.15 $ $PVT/S$PVT/S$ $SPNM 0.00 Acres Operation DisturbanceFM 1217.15 $ $RNG$RNG$ $ 0.00 Acres Construction DisturbanceFM 1217.15 $ $RNG$RNG$ $ 0.00 Acres Operation DisturbanceFM 1217.15 $ $RNG$RNG$ $R 0.07 Acres Construction DisturbanceFM 1217.15 $ $RNG$RNG$ $R 0.05 Acres Operation DisturbanceFM 1217.15 $ $RNG$RNG$ $RN 83.29 Acres Construction DisturbanceFM 1217.15 $ $RNG$RNG$ $RN 26.32 Acres Operation DisturbanceFM 1217.15 $ $RNG$RNG$ $SPM 53.87 Acres Construction DisturbanceFM 1217.15 $ $RNG$RNG$ $SPM 15.29 Acres Operation DisturbanceFM 1217.15 $ $RNG$RNG$ $SPNM 0.04 Acres Construction Disturbance

Page 54: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

FM 1217.15 $ $RNG$RNG$ $SPNM 0.03 Acres Operation DisturbanceFM 1217.15 $ $RPI$RPI$name?$RN 0.18 Acres Construction DisturbanceFM 1217.15 $ $RPI$RPI$name?$RN 0.11 Acres Operation DisturbanceFM 1217.15 $ $SLD$SLD$Mammoth Guard Station$RN 0.11 Acres Construction DisturbanceFM 1217.15 $ $SLD$SLD$Mammoth Guard Station$RN 0.07 Acres Operation DisturbanceFM 1217.15 $ $TBR$TBR$ $ 0.00 Acres Construction DisturbanceFM 1217.15 $ $TBR$TBR$ $ 0.00 Acres Operation DisturbanceFM 1217.15 $ $TBR$TBR$ $RN 8.83 Acres Construction DisturbanceFM 1217.15 $ $TBR$TBR$ $RN 2.46 Acres Operation DisturbanceFM 1217.15 $ $TBR$TBR$ $SPM 7.02 Acres Construction DisturbanceFM 1217.15 $ $TBR$TBR$ $SPM 2.46 Acres Operation DisturbanceFM 1217.15 $ $UCW$UCW$ $ 0.00 Acres Construction DisturbanceFM 1217.15 $ $UCW$UCW$ $ 0.00 Acres Operation DisturbanceFM 1217.15 $ $UCW$UCW$ $RN 0.52 Acres Construction DisturbanceFM 1217.15 $ $UCW$UCW$ $RN 0.20 Acres Operation DisturbanceFM 1217.15 $ $UDM$UDM$ $RN 0.70 Acres Construction DisturbanceFM 1217.15 $ $UDM$UDM$ $RN 0.45 Acres Operation DisturbanceFM 1217.15 $Oak Creek$ $ $ $ 0.00 Acres Construction DisturbanceFM 1217.15 $Oak Creek$ $ $ $ 0.00 Acres Operation DisturbanceFM 1217.15 $Oak Creek$RNG$RNG$ $ 0.00 Acres Construction DisturbanceFM 1217.15 $Oak Creek$RNG$RNG$ $ 0.00 Acres Operation DisturbanceFM 1217.15 $Oak Creek$RNG$RNG$ $RN 4.39 Acres Construction DisturbanceFM 1217.15 $Oak Creek$RNG$RNG$ $RN 2.80 Acres Operation DisturbanceFM 1217.15 $Oak Creek$RNG$RNG$ $SPM 0.49 Acres Construction DisturbanceFM 1217.15 $Oak Creek$RNG$RNG$ $SPM 0.31 Acres Operation DisturbanceFM 1217.15 Nuck Woodward$ $ $ $ $ 0.00 Acres Construction DisturbanceFM 1217.15 Nuck Woodward$ $ $ $ $ 0.00 Acres Operation DisturbanceFM 1217.15 Nuck Woodward$ $ $ $ $SPM 0.00 Acres Construction DisturbanceFM 1217.15 Nuck Woodward$ $ $ $ $SPM 0.00 Acres Operation DisturbanceFM 1217.15 Nuck Woodward$ $RNG$RNG$ $ 0.00 Acres Construction DisturbanceFM 1217.15 Nuck Woodward$ $RNG$RNG$ $ 0.00 Acres Operation DisturbanceFM 1217.15 Nuck Woodward$ $RNG$RNG$ $SPM 0.00 Acres Construction DisturbanceFM 1217.15 Nuck Woodward$ $RNG$RNG$ $SPM 0.00 Acres Operation DisturbanceFM 1217.15 Oak Creek$ $ $ $ $ 0.00 Acres Construction DisturbanceFM 1217.15 Oak Creek$ $ $ $ $ 0.00 Acres Operation DisturbanceFM 1217.15 Oak Creek$ $ $ $ $RN 0.00 Acres Construction DisturbanceFM 1217.15 Oak Creek$ $ $ $ $RN 0.00 Acres Operation DisturbanceFM 1217.15 Oak Creek$ $GWR$GWR$ $ 0.00 Acres Construction DisturbanceFM 1217.15 Oak Creek$ $GWR$GWR$ $ 0.00 Acres Operation DisturbanceFM 1217.15 Oak Creek$ $GWR$GWR$ $RN 0.00 Acres Construction DisturbanceFM 1217.15 Oak Creek$ $GWR$GWR$ $RN 0.00 Acres Operation DisturbanceFM 1217.15 Oak Creek$ $GWR$GWR$ $SPM 0.00 Acres Construction DisturbanceFM 1217.15 Oak Creek$ $GWR$GWR$ $SPM 0.00 Acres Operation DisturbanceFM 1217.15 Oak Creek$ $NA$NA$ $ 0.00 Acres Construction DisturbanceFM 1217.15 Oak Creek$ $NA$NA$ $ 0.00 Acres Operation Disturbance

Page 55: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

FM 1217.15 Oak Creek$ $PVT/S$PVT/S$ $ 0.00 Acres Construction DisturbanceFM 1217.15 Oak Creek$ $PVT/S$PVT/S$ $ 0.00 Acres Operation DisturbanceFM 1217.15 Oak Creek$ $PVT/S$PVT/S$ $RN 0.00 Acres Construction DisturbanceFM 1217.15 Oak Creek$ $PVT/S$PVT/S$ $RN 0.00 Acres Operation DisturbanceFM 1217.15 Oak Creek$ $PVT/S$PVT/S$ $SPM 0.00 Acres Construction DisturbanceFM 1217.15 Oak Creek$ $PVT/S$PVT/S$ $SPM 0.00 Acres Operation DisturbanceFM 1217.15 Oak Creek$ $RNG$RNG$ $ 0.00 Acres Construction DisturbanceFM 1217.15 Oak Creek$ $RNG$RNG$ $ 0.00 Acres Operation DisturbanceFM 1217.15 Oak Creek$ $RNG$RNG$ $SPM 0.00 Acres Construction DisturbanceFM 1217.15 Oak Creek$ $RNG$RNG$ $SPM 0.00 Acres Operation DisturbanceFM 1217.15 Oak Creek$Oak Creek$ $ $ $ 0.00 Acres Construction DisturbanceFM 1217.15 Oak Creek$Oak Creek$ $ $ $ 0.00 Acres Operation DisturbanceFM 1217.15 Oak Creek$Oak Creek$RNG$RNG$ $ 0.00 Acres Construction DisturbanceFM 1217.15 Oak Creek$Oak Creek$RNG$RNG$ $ 0.00 Acres Operation DisturbanceFM 1217.15 Oak Creek$Oak Creek$RNG$RNG$ $RN 0.00 Acres Construction DisturbanceFM 1217.15 Oak Creek$Oak Creek$RNG$RNG$ $RN 0.00 Acres Operation DisturbanceFM 1219.2 $ $ $ $ $RN 0.17 Acres Construction DisturbanceFM 1219.2 $ $ $ $ $RN 0.05 Acres Operation DisturbanceFM 1219.2 $ $5$WHITE RIVER$ $ 12.79 Acres Construction DisturbanceFM 1219.2 $ $5$WHITE RIVER$ $ 3.60 Acres Operation DisturbanceFM 1219.2 $ $5$WHITE RIVER$3.1$ 0.00 Acres Construction DisturbanceFM 1219.2 $ $5$WHITE RIVER$3.1$ 0.00 Acres Operation DisturbanceFM 1219.2 $ $5$WHITE RIVER$3.1$RN 12.55 Acres Construction DisturbanceFM 1219.2 $ $5$WHITE RIVER$3.1$RN 3.55 Acres Operation DisturbanceFM 1219.2 $ $5$WHITE RIVER$3.1$SPM 0.01 Acres Construction DisturbanceFM 1219.2 $ $5$WHITE RIVER$3.1$SPM 0.00 Acres Operation DisturbanceFM 1219.2 $ $d$d$ $RN 3.15 Acres Construction DisturbanceFM 1219.2 $ $d$d$ $RN 0.89 Acres Operation DisturbanceFM 1219.2 $ $f$f$ $RN 2.16 Acres Construction DisturbanceFM 1219.2 $ $f$f$ $RN 0.61 Acres Operation DisturbanceFM 1219.2 $ $n$n$ $RN 3.81 Acres Construction DisturbanceFM 1219.2 $ $n$n$ $RN 1.08 Acres Operation DisturbanceFM 1219.2 $Cottonwood$ $ $ $SPNM 0.00 Acres Construction DisturbanceFM 1219.2 $Cottonwood$ $ $ $SPNM 0.00 Acres Operation DisturbanceFM 1219.2 $Cottonwood$d$d$ $SPNM 0.00 Acres Construction DisturbanceFM 1219.2 $Cottonwood$d$d$ $SPNM 0.00 Acres Operation DisturbanceFM 1219.2 $Cottonwood$n$n$ $SPNM 0.00 Acres Construction DisturbanceFM 1219.2 $Cottonwood$n$n$ $SPNM 0.00 Acres Operation DisturbanceFM 1219.2 $Mill Hollow$ $ $ $RN 0.00 Acres Construction DisturbanceFM 1219.2 $Mill Hollow$ $ $ $RN 0.00 Acres Operation DisturbanceFM 1219.2 $Mill Hollow$d$d$ $RN 0.00 Acres Construction DisturbanceFM 1219.2 $Mill Hollow$d$d$ $RN 0.00 Acres Operation DisturbanceFM 1219.2 $Right Fork Indian Canyon$ $ $ $RN 0.00 Acres Construction DisturbanceFM 1219.2 $Right Fork Indian Canyon$ $ $ $RN 0.00 Acres Operation DisturbanceFM 1219.2 $Right Fork Indian Canyon$d$d$ $RN 0.00 Acres Construction Disturbance

Page 56: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

FM 1219.2 $Right Fork Indian Canyon$d$d$ $RN 0.00 Acres Operation DisturbanceFM 1219.2 0401011$ $ $ $ $ 0.00 Acres Construction DisturbanceFM 1219.2 0401011$ $ $ $ $ 0.00 Acres Operation DisturbanceFM 1219.2 0401011$ $d$d$ $RN 0.00 Acres Construction DisturbanceFM 1219.2 0401011$ $d$d$ $RN 0.00 Acres Operation DisturbanceFM 1219.2 0401012$ $ $ $ $ 0.02 Acres Construction DisturbanceFM 1219.2 0401012$ $ $ $ $ 0.01 Acres Operation DisturbanceFM 1219.2 0401012$ $ $ $ $RN 0.00 Acres Construction DisturbanceFM 1219.2 0401012$ $ $ $ $RN 0.00 Acres Operation DisturbanceFM 1219.2 0401012$ $d$d$ $RN 2.31 Acres Construction DisturbanceFM 1219.2 0401012$ $d$d$ $RN 0.65 Acres Operation DisturbanceFM 1219.2 0401012$ $f$f$ $RN 0.17 Acres Construction DisturbanceFM 1219.2 0401012$ $f$f$ $RN 0.05 Acres Operation DisturbanceFM 1219.2 0401012$ $n$n$ $RN 2.49 Acres Construction DisturbanceFM 1219.2 0401012$ $n$n$ $RN 0.70 Acres Operation DisturbanceFM 1219.2 0401012$Right Fork Indian Canyon$ $ $ $RN 0.00 Acres Construction DisturbanceFM 1219.2 0401012$Right Fork Indian Canyon$ $ $ $RN 0.00 Acres Operation DisturbanceFM 1219.2 0401012$Right Fork Indian Canyon$d$d$ $RN 0.00 Acres Construction DisturbanceFM 1219.2 0401012$Right Fork Indian Canyon$d$d$ $RN 0.00 Acres Operation DisturbanceFM 1219.2 0401012$Right Fork Indian Canyon$f$f$ $RN 0.00 Acres Construction DisturbanceFM 1219.2 0401012$Right Fork Indian Canyon$f$f$ $RN 0.00 Acres Operation DisturbanceFM 1219.2 0401012$Right Fork Indian Canyon$n$n$ $RN 0.00 Acres Construction DisturbanceFM 1219.2 0401012$Right Fork Indian Canyon$n$n$ $RN 0.00 Acres Operation DisturbanceFM 1219.2 0401013$ $ $ $ $ 0.00 Acres Construction DisturbanceFM 1219.2 0401013$ $ $ $ $ 0.00 Acres Operation DisturbanceFM 1219.2 0401013$ $ $ $ $RN 0.00 Acres Construction DisturbanceFM 1219.2 0401013$ $ $ $ $RN 0.00 Acres Operation DisturbanceFM 1219.2 0401013$ $d$d$ $RN 2.58 Acres Construction DisturbanceFM 1219.2 0401013$ $d$d$ $RN 0.73 Acres Operation DisturbanceFM 1219.2 0401013$ $n$n$ $RN 0.51 Acres Construction DisturbanceFM 1219.2 0401013$ $n$n$ $RN 0.14 Acres Operation DisturbanceFM 1219.2 0401013$Mill Hollow$d$d$ $RN 0.00 Acres Construction DisturbanceFM 1219.2 0401013$Mill Hollow$d$d$ $RN 0.00 Acres Operation DisturbanceFM 1219.2 Soldier Summit$ $5$WHITE RIVER$3.1$RN 7.29 Acres Construction DisturbanceFM 1219.2 Soldier Summit$ $5$WHITE RIVER$3.1$RN 2.06 Acres Operation DisturbanceFM 1219.2 Soldier Summit$ $5$WHITE RIVER$3.1$SPM 9.95 Acres Construction DisturbanceFM 1219.2 Soldier Summit$ $5$WHITE RIVER$3.1$SPM 2.84 Acres Operation DisturbanceFM 1219.5 $ $5$WHITE RIVER$ $ 1.48 Acres Construction DisturbanceFM 1219.5 $ $5$WHITE RIVER$ $ 0.47 Acres Operation DisturbanceFM 1219.5 $ $5$WHITE RIVER$3.1$SPM 0.00 Acres Construction DisturbanceFM 1219.5 $ $5$WHITE RIVER$3.1$SPM 0.00 Acres Operation DisturbanceFM 1219.5 Soldier Summit$ $5$WHITE RIVER$3.1$SPM 0.01 Acres Construction DisturbanceFM 1219.5 Soldier Summit$ $5$WHITE RIVER$3.1$SPM 0.00 Acres Operation DisturbanceFM 1310 $ $ $ $ $RN 0.00 Acres Construction DisturbanceFM 1310 $ $ $ $ $RN 0.00 Acres Operation Disturbance

Page 57: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

FM 1310 $ $ $ $ $SPM 0.00 Acres Construction DisturbanceFM 1310 $ $ $ $ $SPM 0.00 Acres Operation DisturbanceFM 1310 $ $DRS$DRS$Indian Creek Campground$RN 3.50 Acres Construction DisturbanceFM 1310 $ $DRS$DRS$Indian Creek Campground$RN 1.09 Acres Operation DisturbanceFM 1310 $ $GWR$GWR$ $ 0.00 Acres Construction DisturbanceFM 1310 $ $GWR$GWR$ $ 0.00 Acres Operation DisturbanceFM 1310 $ $GWR$GWR$ $RN 12.84 Acres Construction DisturbanceFM 1310 $ $GWR$GWR$ $RN 3.34 Acres Operation DisturbanceFM 1310 $ $GWR$GWR$ $SPM 5.17 Acres Construction DisturbanceFM 1310 $ $GWR$GWR$ $SPM 1.06 Acres Operation DisturbanceFM 1310 $ $MMA$MMA$ $ 0.00 Acres Construction DisturbanceFM 1310 $ $MMA$MMA$ $ 0.00 Acres Operation DisturbanceFM 1310 $ $MMA$MMA$ $RN 10.46 Acres Construction DisturbanceFM 1310 $ $MMA$MMA$ $RN 2.33 Acres Operation DisturbanceFM 1310 $ $MMA$MMA$ $SPM 0.15 Acres Construction DisturbanceFM 1310 $ $MMA$MMA$ $SPM 0.10 Acres Operation DisturbanceFM 1310 $ $NA$NA$ $ 16.53 Acres Construction DisturbanceFM 1310 $ $NA$NA$ $ 4.08 Acres Operation DisturbanceFM 1310 $ $NA$NA$ $RN 1.70 Acres Construction DisturbanceFM 1310 $ $NA$NA$ $RN 1.12 Acres Operation DisturbanceFM 1310 $ $NA$NA$ $SPM 0.00 Acres Construction DisturbanceFM 1310 $ $NA$NA$ $SPM 0.00 Acres Operation DisturbanceFM 1310 $ $PVT/S$PVT/S$ $ 55.27 Acres Construction DisturbanceFM 1310 $ $PVT/S$PVT/S$ $ 18.11 Acres Operation DisturbanceFM 1310 $ $PVT/S$PVT/S$ $RN 15.59 Acres Construction DisturbanceFM 1310 $ $PVT/S$PVT/S$ $RN 3.71 Acres Operation DisturbanceFM 1310 $ $PVT/S$PVT/S$ $SPM 0.00 Acres Construction DisturbanceFM 1310 $ $PVT/S$PVT/S$ $SPM 0.00 Acres Operation DisturbanceFM 1310 $ $RNG$RNG$ $ 0.01 Acres Construction DisturbanceFM 1310 $ $RNG$RNG$ $ 0.00 Acres Operation DisturbanceFM 1310 $ $RNG$RNG$ $RN 205.73 Acres Construction DisturbanceFM 1310 $ $RNG$RNG$ $RN 58.56 Acres Operation DisturbanceFM 1310 $ $RNG$RNG$ $SPM 81.18 Acres Construction DisturbanceFM 1310 $ $RNG$RNG$ $SPM 23.01 Acres Operation DisturbanceFM 1310 $ $TBR$TBR$ $RN 3.00 Acres Construction DisturbanceFM 1310 $ $TBR$TBR$ $RN 1.30 Acres Operation DisturbanceFM 1310 $ $UCW$UCW$ $ 0.00 Acres Construction DisturbanceFM 1310 $ $UCW$UCW$ $ 0.00 Acres Operation DisturbanceFM 1310 $ $UCW$UCW$ $RN 3.72 Acres Construction DisturbanceFM 1310 $ $UCW$UCW$ $RN 1.23 Acres Operation DisturbanceFM 1310 $ $UCW$UCW$ $SPM 0.58 Acres Construction DisturbanceFM 1310 $ $UCW$UCW$ $SPM 0.19 Acres Operation DisturbanceFM 1310 $ $WPE$WPE$ $RN 0.43 Acres Construction DisturbanceFM 1310 $ $WPE$WPE$ $RN 0.28 Acres Operation DisturbanceFM 1310 $ $WPE$WPE$ $SPM 1.02 Acres Construction Disturbance

Page 58: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

FM 1310 $ $WPE$WPE$ $SPM 0.68 Acres Operation DisturbanceFM 1310 $East Mountain$GWR$GWR$ $SPM 0.00 Acres Construction DisturbanceFM 1310 $East Mountain$GWR$GWR$ $SPM 0.00 Acres Operation DisturbanceFM 1310 Boulger - Black Canyon$ $NA$NA$ $ 0.00 Acres Construction DisturbanceFM 1310 Boulger - Black Canyon$ $NA$NA$ $ 0.00 Acres Operation DisturbanceFM 1310 Boulger - Black Canyon$ $NA$NA$ $RN 0.00 Acres Construction DisturbanceFM 1310 Boulger - Black Canyon$ $NA$NA$ $RN 0.00 Acres Operation DisturbanceFM 1310 Boulger - Black Canyon$ $NA$NA$ $SPM 0.00 Acres Construction DisturbanceFM 1310 Boulger - Black Canyon$ $NA$NA$ $SPM 0.00 Acres Operation DisturbanceFM 1310 Boulger - Black Canyon$ $RNG$RNG$ $RN 0.00 Acres Construction DisturbanceFM 1310 Boulger - Black Canyon$ $RNG$RNG$ $RN 0.00 Acres Operation DisturbanceFM 1310 Boulger - Black Canyon$ $RNG$RNG$ $SPM 0.00 Acres Construction DisturbanceFM 1310 Boulger - Black Canyon$ $RNG$RNG$ $SPM 0.00 Acres Operation DisturbanceFM 1310 Boulger - Black Canyon$ $TBR$TBR$ $ 0.00 Acres Construction DisturbanceFM 1310 Boulger - Black Canyon$ $TBR$TBR$ $ 0.00 Acres Operation DisturbanceFM 1310 Boulger - Black Canyon$ $TBR$TBR$ $RN 0.00 Acres Construction DisturbanceFM 1310 Boulger - Black Canyon$ $TBR$TBR$ $RN 0.00 Acres Operation DisturbanceFM 1310 Boulger - Black Canyon$ $UCW$UCW$ $ 0.00 Acres Construction DisturbanceFM 1310 Boulger - Black Canyon$ $UCW$UCW$ $ 0.00 Acres Operation DisturbanceFM 1310 Boulger - Black Canyon$ $UCW$UCW$ $RN 0.00 Acres Construction DisturbanceFM 1310 Boulger - Black Canyon$ $UCW$UCW$ $RN 0.00 Acres Operation DisturbanceFM 1310 East Mountain$ $ $ $ $ 0.00 Acres Construction DisturbanceFM 1310 East Mountain$ $ $ $ $ 0.00 Acres Operation DisturbanceFM 1310 East Mountain$ $DRS$DRS$Indian Creek Campground$RN 0.00 Acres Construction DisturbanceFM 1310 East Mountain$ $DRS$DRS$Indian Creek Campground$RN 0.00 Acres Operation DisturbanceFM 1310 East Mountain$ $GWR$GWR$ $SPM 0.03 Acres Construction DisturbanceFM 1310 East Mountain$ $GWR$GWR$ $SPM 0.02 Acres Operation DisturbanceFM 1310 East Mountain$ $PVT/S$PVT/S$ $ 0.00 Acres Construction DisturbanceFM 1310 East Mountain$ $PVT/S$PVT/S$ $ 0.00 Acres Operation DisturbanceFM 1310 East Mountain$ $PVT/S$PVT/S$ $SPM 0.00 Acres Construction DisturbanceFM 1310 East Mountain$ $PVT/S$PVT/S$ $SPM 0.00 Acres Operation DisturbanceFM 1310 East Mountain$ $RNG$RNG$ $ 0.00 Acres Construction DisturbanceFM 1310 East Mountain$ $RNG$RNG$ $ 0.00 Acres Operation DisturbanceFM 1310 East Mountain$ $RNG$RNG$ $RN 0.00 Acres Construction DisturbanceFM 1310 East Mountain$ $RNG$RNG$ $RN 0.00 Acres Operation DisturbanceFM 1310 East Mountain$ $RNG$RNG$ $SPM 0.09 Acres Construction DisturbanceFM 1310 East Mountain$ $RNG$RNG$ $SPM 0.06 Acres Operation DisturbanceFM 1310 East Mountain$ $UCW$UCW$ $SPM 0.14 Acres Construction DisturbanceFM 1310 East Mountain$ $UCW$UCW$ $SPM 0.09 Acres Operation DisturbanceFM 1310 Sanpitch$ $ $ $ $ 0.00 Acres Construction DisturbanceFM 1310 Sanpitch$ $ $ $ $ 0.00 Acres Operation DisturbanceFM 1320.15 $ $ $ $ $ 0.00 Acres Construction DisturbanceFM 1320.15 $ $ $ $ $ 0.00 Acres Operation DisturbanceFM 1320.15 $ $ $ $ $RM 0.00 Acres Construction DisturbanceFM 1320.15 $ $ $ $ $RM 0.00 Acres Operation Disturbance

Page 59: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

FM 1320.15 $ $ $ $ $SPM 0.00 Acres Construction DisturbanceFM 1320.15 $ $ $ $ $SPM 0.00 Acres Operation DisturbanceFM 1320.15 $ $10$UPPER SPANISH FORK CANYON$ $ 0.55 Acres Construction DisturbanceFM 1320.15 $ $10$UPPER SPANISH FORK CANYON$ $ 0.39 Acres Operation DisturbanceFM 1320.15 $ $10$UPPER SPANISH FORK CANYON$ $RM 0.00 Acres Construction DisturbanceFM 1320.15 $ $10$UPPER SPANISH FORK CANYON$ $RM 0.00 Acres Operation DisturbanceFM 1320.15 $ $10$UPPER SPANISH FORK CANYON$3.3$RM 12.48 Acres Construction DisturbanceFM 1320.15 $ $10$UPPER SPANISH FORK CANYON$3.3$RM 8.10 Acres Operation DisturbanceFM 1320.15 $ $10$UPPER SPANISH FORK CANYON$8.2$RM 1.95 Acres Construction DisturbanceFM 1320.15 $ $10$UPPER SPANISH FORK CANYON$8.2$RM 1.23 Acres Operation DisturbanceFM 1320.15 $ $6$NEPHI$5.1$SPM 0.00 Acres Construction DisturbanceFM 1320.15 $ $6$NEPHI$5.1$SPM 0.00 Acres Operation DisturbanceFM 1320.15 $ $9$THISTLE$ $ 0.00 Acres Construction DisturbanceFM 1320.15 $ $9$THISTLE$ $ 0.00 Acres Operation DisturbanceFM 1320.15 $ $9$THISTLE$5.1$SPM 0.85 Acres Construction DisturbanceFM 1320.15 $ $9$THISTLE$5.1$SPM 0.23 Acres Operation DisturbanceFM 1320.15 $ $GWR$GWR$ $ 0.00 Acres Construction DisturbanceFM 1320.15 $ $GWR$GWR$ $ 0.00 Acres Operation DisturbanceFM 1320.15 $ $GWR$GWR$ $RN 2.50 Acres Construction DisturbanceFM 1320.15 $ $GWR$GWR$ $RN 1.07 Acres Operation DisturbanceFM 1320.15 $ $GWR$GWR$ $SPM 0.25 Acres Construction DisturbanceFM 1320.15 $ $GWR$GWR$ $SPM 0.18 Acres Operation DisturbanceFM 1320.15 $ $KWR$KWR$ $ 0.00 Acres Construction DisturbanceFM 1320.15 $ $KWR$KWR$ $ 0.00 Acres Operation DisturbanceFM 1320.15 $ $KWR$KWR$ $SPM 0.01 Acres Construction DisturbanceFM 1320.15 $ $KWR$KWR$ $SPM 0.01 Acres Operation DisturbanceFM 1320.15 $ $RNG$RNG$ $RN 0.20 Acres Construction DisturbanceFM 1320.15 $ $RNG$RNG$ $RN 0.14 Acres Operation DisturbanceFM 1320.15 $Cedar Knoll$ $ $ $ 0.03 Acres Construction DisturbanceFM 1320.15 $Cedar Knoll$ $ $ $ 0.02 Acres Operation DisturbanceFM 1320.15 $Cedar Knoll$ $ $ $SPM 0.00 Acres Construction DisturbanceFM 1320.15 $Cedar Knoll$ $ $ $SPM 0.00 Acres Operation DisturbanceFM 1320.15 $Cedar Knoll$GWR$GWR$ $ 0.00 Acres Construction DisturbanceFM 1320.15 $Cedar Knoll$GWR$GWR$ $ 0.00 Acres Operation DisturbanceFM 1320.15 $Cedar Knoll$GWR$GWR$ $RN 0.85 Acres Construction DisturbanceFM 1320.15 $Cedar Knoll$GWR$GWR$ $RN 0.53 Acres Operation DisturbanceFM 1320.15 $Cedar Knoll$GWR$GWR$ $SPM 6.55 Acres Construction DisturbanceFM 1320.15 $Cedar Knoll$GWR$GWR$ $SPM 4.65 Acres Operation DisturbanceFM 1320.15 $Cedar Knoll$KWR$KWR$ $ 0.00 Acres Construction DisturbanceFM 1320.15 $Cedar Knoll$KWR$KWR$ $ 0.00 Acres Operation DisturbanceFM 1320.15 $Cedar Knoll$KWR$KWR$ $SPM 1.84 Acres Construction DisturbanceFM 1320.15 $Cedar Knoll$KWR$KWR$ $SPM 1.31 Acres Operation DisturbanceFM 1320.15 $Cedar Knoll$RNG$RNG$ $RN 0.30 Acres Construction DisturbanceFM 1320.15 $Cedar Knoll$RNG$RNG$ $RN 0.21 Acres Operation DisturbanceFM 1320.15 $Cedar Knoll$RNG$RNG$ $SPM 0.05 Acres Construction Disturbance

Page 60: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

FM 1320.15 $Cedar Knoll$RNG$RNG$ $SPM 0.04 Acres Operation DisturbanceFM 1320.15 Cedar Knoll$ $ $ $ $ 0.00 Acres Construction DisturbanceFM 1320.15 Cedar Knoll$ $ $ $ $ 0.00 Acres Operation DisturbanceFM 1320.15 Cedar Knoll$ $ $ $ $RN 0.00 Acres Construction DisturbanceFM 1320.15 Cedar Knoll$ $ $ $ $RN 0.00 Acres Operation DisturbanceFM 1320.15 Cedar Knoll$ $GWR$GWR$ $ 0.00 Acres Construction DisturbanceFM 1320.15 Cedar Knoll$ $GWR$GWR$ $ 0.00 Acres Operation DisturbanceFM 1320.15 Cedar Knoll$ $GWR$GWR$ $RN 0.45 Acres Construction DisturbanceFM 1320.15 Cedar Knoll$ $GWR$GWR$ $RN 0.11 Acres Operation DisturbanceFM 1320.15 Cedar Knoll$ $RNG$RNG$ $RN 0.00 Acres Construction DisturbanceFM 1320.15 Cedar Knoll$ $RNG$RNG$ $RN 0.00 Acres Operation DisturbanceFM 1320.15 Cedar Knoll$Cedar Knoll$GWR$GWR$ $RN 0.77 Acres Construction DisturbanceFM 1320.15 Cedar Knoll$Cedar Knoll$GWR$GWR$ $RN 0.20 Acres Operation DisturbanceFM 1320.15 Cedar Knoll$Cedar Knoll$GWR$GWR$ $SPM 0.01 Acres Construction DisturbanceFM 1320.15 Cedar Knoll$Cedar Knoll$GWR$GWR$ $SPM 0.00 Acres Operation DisturbanceFM 1320.15 Cedar Knoll$Cedar Knoll$RNG$RNG$ $RN 0.00 Acres Construction DisturbanceFM 1320.15 Cedar Knoll$Cedar Knoll$RNG$RNG$ $RN 0.00 Acres Operation DisturbanceFM 1320.15 Coal Hollow$ $ $ $ $ 0.00 Acres Construction DisturbanceFM 1320.15 Coal Hollow$ $ $ $ $ 0.00 Acres Operation DisturbanceFM 1320.15 Coal Hollow$ $GWR$GWR$ $ 0.00 Acres Construction DisturbanceFM 1320.15 Coal Hollow$ $GWR$GWR$ $ 0.00 Acres Operation DisturbanceFM 1320.15 Coal Hollow$ $GWR$GWR$ $SPM 0.02 Acres Construction DisturbanceFM 1320.15 Coal Hollow$ $GWR$GWR$ $SPM 0.02 Acres Operation DisturbanceFM 1320.2 $ $ $ $ $RM 0.00 Acres Construction DisturbanceFM 1320.2 $ $ $ $ $RM 0.00 Acres Operation DisturbanceFM 1320.2 $ $ $ $ $RN 0.00 Acres Construction DisturbanceFM 1320.2 $ $ $ $ $RN 0.00 Acres Operation DisturbanceFM 1320.2 $ $6$NEPHI$ $ 0.00 Acres Construction DisturbanceFM 1320.2 $ $6$NEPHI$ $ 0.00 Acres Operation DisturbanceFM 1320.2 $ $6$NEPHI$2.5$RM 0.27 Acres Construction DisturbanceFM 1320.2 $ $6$NEPHI$2.5$RM 0.20 Acres Operation DisturbanceFM 1320.2 $ $6$NEPHI$3.3$RN 0.12 Acres Construction DisturbanceFM 1320.2 $ $6$NEPHI$3.3$RN 0.09 Acres Operation DisturbanceFM 1320.2 Nephi$ $6$NEPHI$2.5$RM 0.00 Acres Construction DisturbanceFM 1320.2 Nephi$ $6$NEPHI$2.5$RM 0.00 Acres Operation DisturbanceFM 1320.21 $ $ $ $ $RN 0.00 Acres Construction DisturbanceFM 1320.21 $ $ $ $ $RN 0.00 Acres Operation DisturbanceFM 1320.21 $ $6$NEPHI$3.3$RN 0.00 Acres Construction DisturbanceFM 1320.21 $ $6$NEPHI$3.3$RN 0.00 Acres Operation DisturbanceFM 1323.02 $ $ $ $ $RM 0.00 Acres Construction DisturbanceFM 1323.02 $ $ $ $ $RM 0.00 Acres Operation DisturbanceFM 1323.02 $ $2$STRAWBERRY RESERVOIR$ $ 0.00 Acres Construction DisturbanceFM 1323.02 $ $2$STRAWBERRY RESERVOIR$ $ 0.00 Acres Operation DisturbanceFM 1323.02 $ $2$STRAWBERRY RESERVOIR$ $RM 0.00 Acres Construction DisturbanceFM 1323.02 $ $2$STRAWBERRY RESERVOIR$ $RM 0.00 Acres Operation Disturbance

Page 61: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

FM 1323.02 $ $2$STRAWBERRY RESERVOIR$4.4$RM 0.32 Acres Construction DisturbanceFM 1323.02 $ $2$STRAWBERRY RESERVOIR$4.4$RM 0.21 Acres Operation DisturbanceFM 1323.02 $ $2$STRAWBERRY RESERVOIR$4.5$RM 0.49 Acres Construction DisturbanceFM 1323.02 $ $2$STRAWBERRY RESERVOIR$4.5$RM 0.32 Acres Operation DisturbanceFM 1323.02 $ $2$STRAWBERRY RESERVOIR$5.2$RN 1.88 Acres Construction DisturbanceFM 1323.02 $ $2$STRAWBERRY RESERVOIR$5.2$RN 0.50 Acres Operation DisturbanceFM 1323.02 $ $2$STRAWBERRY RESERVOIR$8.2$RM 0.10 Acres Construction DisturbanceFM 1323.02 $ $2$STRAWBERRY RESERVOIR$8.2$RM 0.02 Acres Operation DisturbanceFM 1323.02 $ $3$WILLOW CREEK$ $ 0.00 Acres Construction DisturbanceFM 1323.02 $ $3$WILLOW CREEK$ $ 0.00 Acres Operation DisturbanceFM 1323.02 $ $3$WILLOW CREEK$3.1$ 0.00 Acres Construction DisturbanceFM 1323.02 $ $3$WILLOW CREEK$3.1$ 0.00 Acres Operation DisturbanceFM 1323.02 $ $3$WILLOW CREEK$3.1$RN 53.51 Acres Construction DisturbanceFM 1323.02 $ $3$WILLOW CREEK$3.1$RN 13.24 Acres Operation DisturbanceFM 1323.02 $ $3$WILLOW CREEK$3.1$SPM 0.16 Acres Construction DisturbanceFM 1323.02 $ $3$WILLOW CREEK$3.1$SPM 0.04 Acres Operation DisturbanceFM 1323.02 $ $3$WILLOW CREEK$8.2$RN 0.84 Acres Construction DisturbanceFM 1323.02 $ $3$WILLOW CREEK$8.2$RN 0.22 Acres Operation DisturbanceFM 1323.02 Willow Creek$ $3$WILLOW CREEK$8.2$RN 0.00 Acres Construction DisturbanceFM 1323.02 Willow Creek$ $3$WILLOW CREEK$8.2$RN 0.00 Acres Operation DisturbanceFM 1324 $ $10$UPPER SPANISH FORK CANYON$ $ 2.14 Acres Construction DisturbanceFM 1324 $ $10$UPPER SPANISH FORK CANYON$ $ 1.52 Acres Operation DisturbanceFM 1324 $ $10$UPPER SPANISH FORK CANYON$ $RN 0.00 Acres Construction DisturbanceFM 1324 $ $10$UPPER SPANISH FORK CANYON$ $RN 0.00 Acres Operation DisturbanceFM 1324 $ $10$UPPER SPANISH FORK CANYON$ $SPM 0.00 Acres Construction DisturbanceFM 1324 $ $10$UPPER SPANISH FORK CANYON$ $SPM 0.00 Acres Operation DisturbanceFM 1324 $ $10$UPPER SPANISH FORK CANYON$3.1$RN 0.00 Acres Construction DisturbanceFM 1324 $ $10$UPPER SPANISH FORK CANYON$3.1$RN 0.00 Acres Operation DisturbanceFM 1324 $ $10$UPPER SPANISH FORK CANYON$4.4$RM 0.00 Acres Construction DisturbanceFM 1324 $ $10$UPPER SPANISH FORK CANYON$4.4$RM 0.00 Acres Operation DisturbanceFM 1324 $ $10$UPPER SPANISH FORK CANYON$4.4$RN 0.06 Acres Construction DisturbanceFM 1324 $ $10$UPPER SPANISH FORK CANYON$4.4$RN 0.03 Acres Operation DisturbanceFM 1324 $ $10$UPPER SPANISH FORK CANYON$5.2$RN 0.00 Acres Construction DisturbanceFM 1324 $ $10$UPPER SPANISH FORK CANYON$5.2$RN 0.00 Acres Operation DisturbanceFM 1324 $ $10$UPPER SPANISH FORK CANYON$6.1$RN 4.93 Acres Construction DisturbanceFM 1324 $ $10$UPPER SPANISH FORK CANYON$6.1$RN 2.15 Acres Operation DisturbanceFM 1324 $ $10$UPPER SPANISH FORK CANYON$6.1$SPM 0.08 Acres Construction DisturbanceFM 1324 $ $10$UPPER SPANISH FORK CANYON$6.1$SPM 0.05 Acres Operation DisturbanceFM 1324 $ $10$UPPER SPANISH FORK CANYON$8.2$RN 0.10 Acres Construction DisturbanceFM 1324 $ $10$UPPER SPANISH FORK CANYON$8.2$RN 0.03 Acres Operation DisturbanceFM 1324 $ $2$STRAWBERRY RESERVOIR$3.1$RN 0.01 Acres Construction DisturbanceFM 1324 $ $2$STRAWBERRY RESERVOIR$3.1$RN 0.00 Acres Operation DisturbanceFM 1324 $ $2$STRAWBERRY RESERVOIR$5.2$RN 15.53 Acres Construction DisturbanceFM 1324 $ $2$STRAWBERRY RESERVOIR$5.2$RN 5.20 Acres Operation DisturbanceFM 1324 $ $3$WILLOW CREEK$3.1$RN 41.22 Acres Construction Disturbance

Page 62: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

FM 1324 $ $3$WILLOW CREEK$3.1$RN 18.16 Acres Operation DisturbanceFM 1324 $ $3$WILLOW CREEK$5.2$RN 0.01 Acres Construction DisturbanceFM 1324 $ $3$WILLOW CREEK$5.2$RN 0.00 Acres Operation DisturbanceFM 1324 $ $3$WILLOW CREEK$6.1$RN 1.07 Acres Construction DisturbanceFM 1324 $ $3$WILLOW CREEK$6.1$RN 0.73 Acres Operation DisturbanceFM 1324 $ $3$WILLOW CREEK$8.2$RN 1.68 Acres Construction DisturbanceFM 1324 $ $3$WILLOW CREEK$8.2$RN 0.55 Acres Operation DisturbanceFM 1324 Chipman Creek$ $10$UPPER SPANISH FORK CANYON$3.1$RN 0.15 Acres Construction DisturbanceFM 1324 Chipman Creek$ $10$UPPER SPANISH FORK CANYON$3.1$RN 0.05 Acres Operation DisturbanceFM 1324 Chipman Creek$ $10$UPPER SPANISH FORK CANYON$6.1$RN 0.00 Acres Construction DisturbanceFM 1324 Chipman Creek$ $10$UPPER SPANISH FORK CANYON$6.1$RN 0.00 Acres Operation DisturbanceFM 1324 Chipman Creek$ $2$STRAWBERRY RESERVOIR$3.1$RN 0.00 Acres Construction DisturbanceFM 1324 Chipman Creek$ $2$STRAWBERRY RESERVOIR$3.1$RN 0.00 Acres Operation DisturbanceFM 1324 Chipman Creek$ $2$STRAWBERRY RESERVOIR$5.2$RN 0.89 Acres Construction DisturbanceFM 1324 Chipman Creek$ $2$STRAWBERRY RESERVOIR$5.2$RN 0.29 Acres Operation DisturbanceFM 1324 Chipman Creek$ $3$WILLOW CREEK$3.1$RN 12.68 Acres Construction DisturbanceFM 1324 Chipman Creek$ $3$WILLOW CREEK$3.1$RN 4.11 Acres Operation DisturbanceFM 1324 Chipman Creek$ $3$WILLOW CREEK$8.2$RN 0.02 Acres Construction DisturbanceFM 1324 Chipman Creek$ $3$WILLOW CREEK$8.2$RN 0.01 Acres Operation DisturbanceFM 1324 Willow Creek$ $3$WILLOW CREEK$3.1$RN 0.01 Acres Construction DisturbanceFM 1324 Willow Creek$ $3$WILLOW CREEK$3.1$RN 0.00 Acres Operation DisturbanceFM 1324 Willow Creek$ $3$WILLOW CREEK$8.2$RN 0.03 Acres Construction DisturbanceFM 1324 Willow Creek$ $3$WILLOW CREEK$8.2$RN 0.01 Acres Operation DisturbanceFM 1325 $ $ $ $ $RM 0.00 Acres Construction DisturbanceFM 1325 $ $ $ $ $RM 0.00 Acres Operation DisturbanceFM 1325 $ $10$UPPER SPANISH FORK CANYON$ $ 0.00 Acres Construction DisturbanceFM 1325 $ $10$UPPER SPANISH FORK CANYON$ $ 0.00 Acres Operation DisturbanceFM 1325 $ $10$UPPER SPANISH FORK CANYON$ $RM 0.00 Acres Construction DisturbanceFM 1325 $ $10$UPPER SPANISH FORK CANYON$ $RM 0.00 Acres Operation DisturbanceFM 1325 $ $10$UPPER SPANISH FORK CANYON$3.3$RM 4.54 Acres Construction DisturbanceFM 1325 $ $10$UPPER SPANISH FORK CANYON$3.3$RM 3.22 Acres Operation DisturbanceFM 1325 $ $10$UPPER SPANISH FORK CANYON$3.3$RN 0.60 Acres Construction DisturbanceFM 1325 $ $10$UPPER SPANISH FORK CANYON$3.3$RN 0.43 Acres Operation DisturbanceFM 1325 $ $10$UPPER SPANISH FORK CANYON$3.3$SPM 12.23 Acres Construction DisturbanceFM 1325 $ $10$UPPER SPANISH FORK CANYON$3.3$SPM 4.68 Acres Operation DisturbanceFM 1325 $ $10$UPPER SPANISH FORK CANYON$4.4$RM 75.48 Acres Construction DisturbanceFM 1325 $ $10$UPPER SPANISH FORK CANYON$4.4$RM 30.40 Acres Operation DisturbanceFM 1325 $ $10$UPPER SPANISH FORK CANYON$4.4$RN 0.09 Acres Construction DisturbanceFM 1325 $ $10$UPPER SPANISH FORK CANYON$4.4$RN 0.03 Acres Operation DisturbanceFM 1325 $ $10$UPPER SPANISH FORK CANYON$6.1$RM 0.00 Acres Construction DisturbanceFM 1325 $ $10$UPPER SPANISH FORK CANYON$6.1$RM 0.00 Acres Operation DisturbanceFM 1325 $ $10$UPPER SPANISH FORK CANYON$6.1$RN 1.16 Acres Construction DisturbanceFM 1325 $ $10$UPPER SPANISH FORK CANYON$6.1$RN 0.44 Acres Operation DisturbanceFM 1325 $ $10$UPPER SPANISH FORK CANYON$6.1$SPM 53.40 Acres Construction DisturbanceFM 1325 $ $10$UPPER SPANISH FORK CANYON$6.1$SPM 20.51 Acres Operation Disturbance

Page 63: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

FM 1325 $ $10$UPPER SPANISH FORK CANYON$8.2$RM 3.39 Acres Construction DisturbanceFM 1325 $ $10$UPPER SPANISH FORK CANYON$8.2$RM 1.60 Acres Operation DisturbanceFM 1325 $ $10$UPPER SPANISH FORK CANYON$8.2$RN 0.08 Acres Construction DisturbanceFM 1325 $ $10$UPPER SPANISH FORK CANYON$8.2$RN 0.03 Acres Operation DisturbanceFM 1325 $ $10$UPPER SPANISH FORK CANYON$8.2$SPM 2.38 Acres Construction DisturbanceFM 1325 $ $10$UPPER SPANISH FORK CANYON$8.2$SPM 0.91 Acres Operation DisturbanceFM 1325 $ $11$DIAMOND FORK$4.4$RM 1.22 Acres Construction DisturbanceFM 1325 $ $11$DIAMOND FORK$4.4$RM 0.49 Acres Operation DisturbanceFM 1325 $ $2$STRAWBERRY RESERVOIR$4.4$RM 0.10 Acres Construction DisturbanceFM 1325 $ $2$STRAWBERRY RESERVOIR$4.4$RM 0.07 Acres Operation DisturbanceFM 1325 Tie Fork$ $10$UPPER SPANISH FORK CANYON$6.1$SPM 0.09 Acres Construction DisturbanceFM 1325 Tie Fork$ $10$UPPER SPANISH FORK CANYON$6.1$SPM 0.03 Acres Operation DisturbanceFM 1325.1 $ $ $ $ $RN 0.01 Acres Construction DisturbanceFM 1325.1 $ $ $ $ $RN 0.00 Acres Operation DisturbanceFM 1325.1 $ $90$90$ $RN 10.57 Acres Construction DisturbanceFM 1325.1 $ $90$90$ $RN 1.14 Acres Operation DisturbanceFM 1325.1 $ $f$f$ $RN 0.00 Acres Construction DisturbanceFM 1325.1 $ $f$f$ $RN 0.00 Acres Operation DisturbanceFM 1325.1 $ $n$n$ $RN 9.90 Acres Construction DisturbanceFM 1325.1 $ $n$n$ $RN 1.07 Acres Operation DisturbanceFM 1325.1 $Cottonwood$ $ $ $ 0.00 Acres Construction DisturbanceFM 1325.1 $Cottonwood$ $ $ $ 0.00 Acres Operation DisturbanceFM 1325.1 $Cottonwood$ $ $ $RN 0.00 Acres Construction DisturbanceFM 1325.1 $Cottonwood$ $ $ $RN 0.00 Acres Operation DisturbanceFM 1325.1 $Cottonwood$ $ $ $SPM 0.00 Acres Construction DisturbanceFM 1325.1 $Cottonwood$ $ $ $SPM 0.00 Acres Operation DisturbanceFM 1325.1 $Cottonwood$ $ $ $SPNM 0.00 Acres Construction DisturbanceFM 1325.1 $Cottonwood$ $ $ $SPNM 0.00 Acres Operation DisturbanceFM 1325.1 $Cottonwood$90$90$ $RN 0.00 Acres Construction DisturbanceFM 1325.1 $Cottonwood$90$90$ $RN 0.00 Acres Operation DisturbanceFM 1325.1 $Cottonwood$d$d$ $SPNM 0.00 Acres Construction DisturbanceFM 1325.1 $Cottonwood$d$d$ $SPNM 0.00 Acres Operation DisturbanceFM 1325.1 $Cottonwood$f$f$ $SPM 0.00 Acres Construction DisturbanceFM 1325.1 $Cottonwood$f$f$ $SPM 0.00 Acres Operation DisturbanceFM 1325.1 $Cottonwood$f$f$ $SPNM 0.00 Acres Construction DisturbanceFM 1325.1 $Cottonwood$f$f$ $SPNM 0.00 Acres Operation DisturbanceFM 1325.1 $Cottonwood$n$n$ $RN 0.34 Acres Construction DisturbanceFM 1325.1 $Cottonwood$n$n$ $RN 0.04 Acres Operation DisturbanceFM 1325.1 $Cottonwood$n$n$ $SPM 0.00 Acres Construction DisturbanceFM 1325.1 $Cottonwood$n$n$ $SPM 0.00 Acres Operation DisturbanceFM 1325.1 $Cottonwood$n$n$ $SPNM 0.00 Acres Construction DisturbanceFM 1325.1 $Cottonwood$n$n$ $SPNM 0.00 Acres Operation DisturbanceFM 1325.1 $Sowers Canyon East$ $ $ $RN 0.01 Acres Construction DisturbanceFM 1325.1 $Sowers Canyon East$ $ $ $RN 0.00 Acres Operation DisturbanceFM 1325.1 $Sowers Canyon East$90$90$ $RN 0.00 Acres Construction Disturbance

Page 64: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

FM 1325.1 $Sowers Canyon East$90$90$ $RN 0.00 Acres Operation DisturbanceFM 1325.1 $Sowers Canyon East$n$n$ $RN 0.09 Acres Construction DisturbanceFM 1325.1 $Sowers Canyon East$n$n$ $RN 0.01 Acres Operation DisturbanceFM 1325.1 0401010$ $ $ $ $ 0.01 Acres Construction DisturbanceFM 1325.1 0401010$ $ $ $ $ 0.00 Acres Operation DisturbanceFM 1325.1 0401010$ $ $ $ $RN 0.00 Acres Construction DisturbanceFM 1325.1 0401010$ $ $ $ $RN 0.00 Acres Operation DisturbanceFM 1325.1 0401010$ $90$90$ $RN 0.52 Acres Construction DisturbanceFM 1325.1 0401010$ $90$90$ $RN 0.06 Acres Operation DisturbanceFM 1325.1 0401010$ $f$f$ $RN 1.12 Acres Construction DisturbanceFM 1325.1 0401010$ $f$f$ $RN 0.12 Acres Operation DisturbanceFM 1325.1 0401010$ $n$n$ $RN 1.07 Acres Construction DisturbanceFM 1325.1 0401010$ $n$n$ $RN 0.12 Acres Operation DisturbanceFM 1325.1 0401010$Cottonwood$f$f$ $RN 0.00 Acres Construction DisturbanceFM 1325.1 0401010$Cottonwood$f$f$ $RN 0.00 Acres Operation DisturbanceFM 1325.1 0401010$Cottonwood$n$n$ $RN 0.00 Acres Construction DisturbanceFM 1325.1 0401010$Cottonwood$n$n$ $RN 0.00 Acres Operation DisturbanceFM 1325.1 0401010$Sowers Canyon East$90$90$ $RN 0.00 Acres Construction DisturbanceFM 1325.1 0401010$Sowers Canyon East$90$90$ $RN 0.00 Acres Operation DisturbanceFM 1325.1 0401010$Sowers Canyon East$d$d$ $RN 0.04 Acres Construction DisturbanceFM 1325.1 0401010$Sowers Canyon East$d$d$ $RN 0.00 Acres Operation DisturbanceFM 1325.1 0401010$Sowers Canyon East$f$f$ $RN 1.29 Acres Construction DisturbanceFM 1325.1 0401010$Sowers Canyon East$f$f$ $RN 0.14 Acres Operation DisturbanceFM 1325.1 0401010$Sowers Canyon East$n$n$ $RN 26.17 Acres Construction DisturbanceFM 1325.1 0401010$Sowers Canyon East$n$n$ $RN 2.82 Acres Operation DisturbanceFM 1325.1 0401011$ $ $ $ $ 0.00 Acres Construction DisturbanceFM 1325.1 0401011$ $ $ $ $ 0.00 Acres Operation DisturbanceFM 1325.1 0401011$ $90$90$ $RN 0.04 Acres Construction DisturbanceFM 1325.1 0401011$ $90$90$ $RN 0.00 Acres Operation DisturbanceFM 1325.1 0401011$ $f$f$ $RN 4.02 Acres Construction DisturbanceFM 1325.1 0401011$ $f$f$ $RN 0.43 Acres Operation DisturbanceFM 1325.1 0401011$ $n$n$ $RN 7.21 Acres Construction DisturbanceFM 1325.1 0401011$ $n$n$ $RN 0.78 Acres Operation DisturbanceFM 1325.1 0401011$Cottonwood$ $ $ $RN 0.00 Acres Construction DisturbanceFM 1325.1 0401011$Cottonwood$ $ $ $RN 0.00 Acres Operation DisturbanceFM 1325.1 0401011$Cottonwood$90$90$ $RN 0.00 Acres Construction DisturbanceFM 1325.1 0401011$Cottonwood$90$90$ $RN 0.00 Acres Operation DisturbanceFM 1325.1 0401011$Cottonwood$f$f$ $RN 0.94 Acres Construction DisturbanceFM 1325.1 0401011$Cottonwood$f$f$ $RN 0.10 Acres Operation DisturbanceFM 1325.1 0401011$Cottonwood$n$n$ $RN 16.90 Acres Construction DisturbanceFM 1325.1 0401011$Cottonwood$n$n$ $RN 1.82 Acres Operation DisturbanceFM 1325.1 0401011$Sowers Canyon East$f$f$ $RN 0.00 Acres Construction DisturbanceFM 1325.1 0401011$Sowers Canyon East$f$f$ $RN 0.00 Acres Operation DisturbanceFM 1325.1 0401011$Sowers Canyon East$n$n$ $RN 0.01 Acres Construction DisturbanceFM 1325.1 0401011$Sowers Canyon East$n$n$ $RN 0.00 Acres Operation Disturbance

Page 65: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

FM 1330.1 $ $ $ $ $RN 0.00 Acres Construction DisturbanceFM 1330.1 $ $ $ $ $RN 0.00 Acres Operation DisturbanceFM 1330.1 $ $ $ $ $SPM 0.00 Acres Construction DisturbanceFM 1330.1 $ $ $ $ $SPM 0.00 Acres Operation DisturbanceFM 1330.1 $ $2B$2B$Rural+Roaded Natural Recreation$ 0.00 Acres Construction DisturbanceFM 1330.1 $ $2B$2B$Rural+Roaded Natural Recreation$ 0.00 Acres Operation DisturbanceFM 1330.1 $ $2B$2B$Rural+Roaded Natural Recreation$RN 15.15 Acres Construction DisturbanceFM 1330.1 $ $2B$2B$Rural+Roaded Natural Recreation$RN 3.59 Acres Operation DisturbanceFM 1330.1 $ $2B$2B$Rural+Roaded Natural Recreation$SPM 0.24 Acres Construction DisturbanceFM 1330.1 $ $2B$2B$Rural+Roaded Natural Recreation$SPM 0.09 Acres Operation DisturbanceFM 1330.1 $ $4A$4A$Fish Habitat Improvement$ 0.00 Acres Construction DisturbanceFM 1330.1 $ $4A$4A$Fish Habitat Improvement$ 0.00 Acres Operation DisturbanceFM 1330.1 $ $4A$4A$Fish Habitat Improvement$RN 0.05 Acres Construction DisturbanceFM 1330.1 $ $4A$4A$Fish Habitat Improvement$RN 0.03 Acres Operation DisturbanceFM 1330.1 $ $4B$4B$Habitat for Management Indicator Species$ 0.00 Acres Construction DisturbanceFM 1330.1 $ $4B$4B$Habitat for Management Indicator Species$ 0.00 Acres Operation DisturbanceFM 1330.1 $ $4B$4B$Habitat for Management Indicator Species$RN 10.74 Acres Construction DisturbanceFM 1330.1 $ $4B$4B$Habitat for Management Indicator Species$RN 3.37 Acres Operation DisturbanceFM 1330.1 $ $4B$4B$Habitat for Management Indicator Species$SPM 103.74 Acres Construction DisturbanceFM 1330.1 $ $4B$4B$Habitat for Management Indicator Species$SPM 20.54 Acres Operation DisturbanceFM 1330.1 $ $5A$5A$Big Game Winter Range--Non-Forested$RN 33.95 Acres Construction DisturbanceFM 1330.1 $ $5A$5A$Big Game Winter Range--Non-Forested$RN 10.61 Acres Operation DisturbanceFM 1330.1 $ $6B$6B$Intensive Livestock Management$ 0.00 Acres Construction DisturbanceFM 1330.1 $ $6B$6B$Intensive Livestock Management$ 0.00 Acres Operation DisturbanceFM 1330.1 $ $6B$6B$Intensive Livestock Management$RN 27.77 Acres Construction DisturbanceFM 1330.1 $ $6B$6B$Intensive Livestock Management$RN 5.94 Acres Operation DisturbanceFM 1330.1 $ $6B$6B$Intensive Livestock Management$SPM 65.13 Acres Construction DisturbanceFM 1330.1 $ $6B$6B$Intensive Livestock Management$SPM 13.80 Acres Operation DisturbanceFM 1330.1 $ $9F$9F$Improved Watershed$RN 37.11 Acres Construction DisturbanceFM 1330.1 $ $9F$9F$Improved Watershed$RN 13.52 Acres Operation DisturbanceFM 1330.1 $Browns Hole$2B$2B$Rural+Roaded Natural Recreation$RN 0.56 Acres Construction DisturbanceFM 1330.1 $Browns Hole$2B$2B$Rural+Roaded Natural Recreation$RN 0.27 Acres Operation DisturbanceFM 1330.1 $Browns Hole$4B$4B$Habitat for Management Indicator Species$RN 15.49 Acres Construction DisturbanceFM 1330.1 $Browns Hole$4B$4B$Habitat for Management Indicator Species$RN 4.17 Acres Operation DisturbanceFM 1330.1 $Browns Hole$4B$4B$Habitat for Management Indicator Species$SPM 100.52 Acres Construction DisturbanceFM 1330.1 $Browns Hole$4B$4B$Habitat for Management Indicator Species$SPM 15.86 Acres Operation DisturbanceFM 1330.1 $North Pavant$ $ $ $SPM 0.00 Acres Construction DisturbanceFM 1330.1 $North Pavant$ $ $ $SPM 0.00 Acres Operation DisturbanceFM 1330.1 $North Pavant$6B$6B$Intensive Livestock Management$SPM 0.00 Acres Construction DisturbanceFM 1330.1 $North Pavant$6B$6B$Intensive Livestock Management$SPM 0.00 Acres Operation DisturbanceFM 1340 $ $ $ $ $RN 0.00 Acres Construction DisturbanceFM 1340 $ $ $ $ $RN 0.00 Acres Operation DisturbanceFM 1340 $ $6$NEPHI$ $ 10.53 Acres Construction DisturbanceFM 1340 $ $6$NEPHI$ $ 1.53 Acres Operation DisturbanceFM 1340 $ $6$NEPHI$1.4$P 0.00 Acres Construction Disturbance

Page 66: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

FM 1340 $ $6$NEPHI$1.4$P 0.00 Acres Operation DisturbanceFM 1340 $ $6$NEPHI$3.3$RN 0.15 Acres Construction DisturbanceFM 1340 $ $6$NEPHI$3.3$RN 0.07 Acres Operation DisturbanceFM 1340 $ $6$NEPHI$8.2$R 0.10 Acres Construction DisturbanceFM 1340 $ $6$NEPHI$8.2$R 0.05 Acres Operation DisturbanceFM 1340 $ $6$NEPHI$8.2$RN 0.03 Acres Construction DisturbanceFM 1340 $ $6$NEPHI$8.2$RN 0.01 Acres Operation DisturbanceFM 1340 $ $7$MONA$ $ 0.00 Acres Construction DisturbanceFM 1340 $ $7$MONA$ $ 0.00 Acres Operation DisturbanceFM 1340 $ $7$MONA$3.3$RN 0.14 Acres Construction DisturbanceFM 1340 $ $7$MONA$3.3$RN 0.07 Acres Operation DisturbanceFM 1340 $ $7$MONA$8.2$RN 0.03 Acres Construction DisturbanceFM 1340 $ $7$MONA$8.2$RN 0.02 Acres Operation DisturbanceFM 1350 $ $ $ $ $RN 0.00 Acres Construction DisturbanceFM 1350 $ $ $ $ $RN 0.00 Acres Operation DisturbanceFM 1350 $ $RNG$RNG$ $ 0.00 Acres Construction DisturbanceFM 1350 $ $RNG$RNG$ $ 0.00 Acres Operation DisturbanceFM 1350 $ $RNG$RNG$ $RN 2.97 Acres Construction DisturbanceFM 1350 $ $RNG$RNG$ $RN 1.22 Acres Operation DisturbanceFM 1370 $ $6B$6B$Intensive Livestock Management$RN 1.18 Acres Construction DisturbanceFM 1370 $ $6B$6B$Intensive Livestock Management$RN 0.61 Acres Operation DisturbanceFM 1370 $ $6B$6B$Intensive Livestock Management$SPM 0.02 Acres Construction DisturbanceFM 1370 $ $6B$6B$Intensive Livestock Management$SPM 0.01 Acres Operation DisturbanceFM 1380 $ $ $ $ $RN 0.00 Acres Construction DisturbanceFM 1380 $ $ $ $ $RN 0.00 Acres Operation DisturbanceFM 1380 $ $ $ $ $SPM 0.00 Acres Construction DisturbanceFM 1380 $ $ $ $ $SPM 0.00 Acres Operation DisturbanceFM 1380 $ $6B$6B$Intensive Livestock Management$RN 14.21 Acres Construction DisturbanceFM 1380 $ $6B$6B$Intensive Livestock Management$RN 3.78 Acres Operation DisturbanceFM 1380 $ $6B$6B$Intensive Livestock Management$SPM 0.33 Acres Construction DisturbanceFM 1380 $ $6B$6B$Intensive Livestock Management$SPM 0.14 Acres Operation DisturbanceFM 1400 $ $ $ $ $SPM 0.00 Acres Construction DisturbanceFM 1400 $ $ $ $ $SPM 0.00 Acres Operation DisturbanceFM 1400 $ $6B$6B$Intensive Livestock Management$SPM 1.87 Acres Construction DisturbanceFM 1400 $ $6B$6B$Intensive Livestock Management$SPM 0.54 Acres Operation DisturbanceFM 1410 $ $6B$6B$Intensive Livestock Management$ 0.00 Acres Construction DisturbanceFM 1410 $ $6B$6B$Intensive Livestock Management$ 0.00 Acres Operation DisturbanceFM 1410 $ $6B$6B$Intensive Livestock Management$RN 107.99 Acres Construction DisturbanceFM 1410 $ $6B$6B$Intensive Livestock Management$RN 20.10 Acres Operation DisturbanceFM 1410 $ $6B$6B$Intensive Livestock Management$SPM 2.67 Acres Construction DisturbanceFM 1410 $ $6B$6B$Intensive Livestock Management$SPM 0.99 Acres Operation DisturbanceFM 1500.05 $ $1$1$General Forest Direction$RN 1.78 Acres Construction DisturbanceFM 1500.05 $ $1$1$General Forest Direction$RN 0.34 Acres Operation DisturbanceFM 1500.05 $ $1$1$General Forest Direction$SPM 0.54 Acres Construction DisturbanceFM 1500.05 $ $1$1$General Forest Direction$SPM 0.17 Acres Operation Disturbance

Page 67: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

FM 1500.05 $ $1$1$General Forest Direction$SPNM 0.01 Acres Construction DisturbanceFM 1500.05 $ $1$1$General Forest Direction$SPNM 0.01 Acres Operation DisturbanceFM 1500.05 $ $6A$6A$Livestock Grazing$RN 5.03 Acres Construction DisturbanceFM 1500.05 $ $6A$6A$Livestock Grazing$RN 0.96 Acres Operation DisturbanceFM 1500.05 $ $6A$6A$Livestock Grazing$SPM 14.83 Acres Construction DisturbanceFM 1500.05 $ $6A$6A$Livestock Grazing$SPM 2.98 Acres Operation DisturbanceFM 1500.05 $Cove Mountain$ $ $ $ 0.00 Acres Construction DisturbanceFM 1500.05 $Cove Mountain$ $ $ $ 0.00 Acres Operation DisturbanceFM 1500.05 $Cove Mountain$1$1$General Forest Direction$RN 0.00 Acres Construction DisturbanceFM 1500.05 $Cove Mountain$1$1$General Forest Direction$RN 0.00 Acres Operation DisturbanceFM 1500.05 $Cove Mountain$1$1$General Forest Direction$SPM 0.00 Acres Construction DisturbanceFM 1500.05 $Cove Mountain$1$1$General Forest Direction$SPM 0.00 Acres Operation DisturbanceFM 1500.05 $Cove Mountain$6A$6A$Livestock Grazing$SPM 0.00 Acres Construction DisturbanceFM 1500.05 $Cove Mountain$6A$6A$Livestock Grazing$SPM 0.00 Acres Operation DisturbanceFM 1500.05 Cove Mountain$ $1$1$General Forest Direction$RN 0.00 Acres Construction DisturbanceFM 1500.05 Cove Mountain$ $1$1$General Forest Direction$RN 0.00 Acres Operation DisturbanceFM 1500.05 Cove Mountain$ $6A$6A$Livestock Grazing$SPM 0.00 Acres Construction DisturbanceFM 1500.05 Cove Mountain$ $6A$6A$Livestock Grazing$SPM 0.00 Acres Operation DisturbanceFM 1500.05 Cove Mountain$Cove Mountain$1$1$General Forest Direction$RN 2.83 Acres Construction DisturbanceFM 1500.05 Cove Mountain$Cove Mountain$1$1$General Forest Direction$RN 0.54 Acres Operation DisturbanceFM 1500.05 Cove Mountain$Cove Mountain$1$1$General Forest Direction$SPNM 0.02 Acres Construction DisturbanceFM 1500.05 Cove Mountain$Cove Mountain$1$1$General Forest Direction$SPNM 0.00 Acres Operation DisturbanceFM 1500.05 Cove Mountain$Cove Mountain$6A$6A$Livestock Grazing$SPM 0.39 Acres Construction DisturbanceFM 1500.05 Cove Mountain$Cove Mountain$6A$6A$Livestock Grazing$SPM 0.07 Acres Operation DisturbanceFM 1501.1 $ $1$1$General Forest Direction$RN 11.83 Acres Construction DisturbanceFM 1501.1 $ $1$1$General Forest Direction$RN 2.82 Acres Operation DisturbanceFM 1501.1 $ $1$1$General Forest Direction$SPM 22.40 Acres Construction DisturbanceFM 1501.1 $ $1$1$General Forest Direction$SPM 5.34 Acres Operation DisturbanceFM 1501.1 $ $1$1$General Forest Direction$SPNM 1.49 Acres Construction DisturbanceFM 1501.1 $ $1$1$General Forest Direction$SPNM 0.87 Acres Operation DisturbanceFM 1501.1 $ $2B$2B$Rural and Roaded Recreation Opportunities$RN 38.76 Acres Construction DisturbanceFM 1501.1 $ $2B$2B$Rural and Roaded Recreation Opportunities$RN 9.38 Acres Operation DisturbanceFM 1501.1 $ $2B$2B$Rural and Roaded Recreation Opportunities$SPM 1.13 Acres Construction DisturbanceFM 1501.1 $ $2B$2B$Rural and Roaded Recreation Opportunities$SPM 0.24 Acres Operation DisturbanceFM 1501.1 $ $2B$2B$Rural and Roaded Recreation Opportunities$SPNM 0.39 Acres Construction DisturbanceFM 1501.1 $ $2B$2B$Rural and Roaded Recreation Opportunities$SPNM 0.08 Acres Operation DisturbanceFM 1501.1 $ $5A$5A$Big Game Winter Range (Non-Forest)$RN 1.09 Acres Construction DisturbanceFM 1501.1 $ $5A$5A$Big Game Winter Range (Non-Forest)$RN 0.16 Acres Operation DisturbanceFM 1501.1 $ $5A$5A$Big Game Winter Range (Non-Forest)$SPM 12.06 Acres Construction DisturbanceFM 1501.1 $ $5A$5A$Big Game Winter Range (Non-Forest)$SPM 2.44 Acres Operation DisturbanceFM 1501.1 $ $6A$6A$Livestock Grazing$RN 36.62 Acres Construction DisturbanceFM 1501.1 $ $6A$6A$Livestock Grazing$RN 10.50 Acres Operation DisturbanceFM 1501.1 $ $6A$6A$Livestock Grazing$SPM 36.22 Acres Construction DisturbanceFM 1501.1 $ $6A$6A$Livestock Grazing$SPM 8.51 Acres Operation DisturbanceFM 1501.1 $ $6A$6A$Livestock Grazing$SPNM 0.30 Acres Construction Disturbance

Page 68: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

FM 1501.1 $ $6A$6A$Livestock Grazing$SPNM 0.17 Acres Operation DisturbanceFM 1501.1 $Atchinson$ $ $ $ 0.09 Acres Construction DisturbanceFM 1501.1 $Atchinson$ $ $ $ 0.02 Acres Operation DisturbanceFM 1501.1 $Atchinson$1$1$General Forest Direction$RN 1.52 Acres Construction DisturbanceFM 1501.1 $Atchinson$1$1$General Forest Direction$RN 0.50 Acres Operation DisturbanceFM 1501.1 $Atchinson$1$1$General Forest Direction$SPM 0.39 Acres Construction DisturbanceFM 1501.1 $Atchinson$1$1$General Forest Direction$SPM 0.12 Acres Operation DisturbanceFM 1501.1 $Atchinson$1$1$General Forest Direction$SPNM 1.86 Acres Construction DisturbanceFM 1501.1 $Atchinson$1$1$General Forest Direction$SPNM 0.54 Acres Operation DisturbanceFM 1501.1 $Atchinson$2B$2B$Rural and Roaded Recreation Opportunities$RN 3.06 Acres Construction DisturbanceFM 1501.1 $Atchinson$2B$2B$Rural and Roaded Recreation Opportunities$RN 0.91 Acres Operation DisturbanceFM 1501.1 $Atchinson$2B$2B$Rural and Roaded Recreation Opportunities$SPNM 0.11 Acres Construction DisturbanceFM 1501.1 $Atchinson$2B$2B$Rural and Roaded Recreation Opportunities$SPNM 0.03 Acres Operation DisturbanceFM 1501.1 $Atchinson$4C$4C$Wildlife Habitat (Shrub Areas)$RN 0.01 Acres Construction DisturbanceFM 1501.1 $Atchinson$4C$4C$Wildlife Habitat (Shrub Areas)$RN 0.00 Acres Operation DisturbanceFM 1501.1 $Atchinson$4C$4C$Wildlife Habitat (Shrub Areas)$SPNM 0.31 Acres Construction DisturbanceFM 1501.1 $Atchinson$4C$4C$Wildlife Habitat (Shrub Areas)$SPNM 0.19 Acres Operation DisturbanceFM 1501.1 $Atchinson$6A$6A$Livestock Grazing$RN 6.21 Acres Construction DisturbanceFM 1501.1 $Atchinson$6A$6A$Livestock Grazing$RN 1.65 Acres Operation DisturbanceFM 1501.1 $Atchinson$6A$6A$Livestock Grazing$SPM 12.40 Acres Construction DisturbanceFM 1501.1 $Atchinson$6A$6A$Livestock Grazing$SPM 3.06 Acres Operation DisturbanceFM 1501.1 $Atchinson$6A$6A$Livestock Grazing$SPNM 0.49 Acres Construction DisturbanceFM 1501.1 $Atchinson$6A$6A$Livestock Grazing$SPNM 0.19 Acres Operation DisturbanceFM 1501.1 $Cove Mountain$1$1$General Forest Direction$SPM 1.00 Acres Construction DisturbanceFM 1501.1 $Cove Mountain$1$1$General Forest Direction$SPM 0.21 Acres Operation DisturbanceFM 1501.1 $Cove Mountain$1$1$General Forest Direction$SPNM 0.10 Acres Construction DisturbanceFM 1501.1 $Cove Mountain$1$1$General Forest Direction$SPNM 0.02 Acres Operation DisturbanceFM 1501.1 $Cove Mountain$6A$6A$Livestock Grazing$RN 0.75 Acres Construction DisturbanceFM 1501.1 $Cove Mountain$6A$6A$Livestock Grazing$RN 0.46 Acres Operation DisturbanceFM 1501.1 $Cove Mountain$6A$6A$Livestock Grazing$SPM 0.41 Acres Construction DisturbanceFM 1501.1 $Cove Mountain$6A$6A$Livestock Grazing$SPM 0.09 Acres Operation DisturbanceFM 1501.1 $Cove Mountain$6A$6A$Livestock Grazing$SPNM 0.12 Acres Construction DisturbanceFM 1501.1 $Cove Mountain$6A$6A$Livestock Grazing$SPNM 0.03 Acres Operation DisturbanceFM 1501.1 $Moody Wash / Mogotsu$ $ $ $ 0.01 Acres Construction DisturbanceFM 1501.1 $Moody Wash / Mogotsu$ $ $ $ 0.00 Acres Operation DisturbanceFM 1501.1 $Moody Wash / Mogotsu$1$1$General Forest Direction$RN 0.33 Acres Construction DisturbanceFM 1501.1 $Moody Wash / Mogotsu$1$1$General Forest Direction$RN 0.21 Acres Operation DisturbanceFM 1501.1 $Moody Wash / Mogotsu$1$1$General Forest Direction$SPM 0.01 Acres Construction DisturbanceFM 1501.1 $Moody Wash / Mogotsu$1$1$General Forest Direction$SPM 0.00 Acres Operation DisturbanceFM 1501.1 $Moody Wash / Mogotsu$1$1$General Forest Direction$SPNM 0.49 Acres Construction DisturbanceFM 1501.1 $Moody Wash / Mogotsu$1$1$General Forest Direction$SPNM 0.31 Acres Operation DisturbanceFM 1501.1

$Moody Wash / Mogotsu$2B$2B$Rural and Roaded Recreation Opportunities$RN

0.54 Acres Construction DisturbanceFM 1501.1

$Moody Wash / Mogotsu$2B$2B$Rural and Roaded Recreation Opportunities$RN

0.34 Acres Operation DisturbanceFM 1501.1

$Moody Wash / Mogotsu$2B$2B$Rural and Roaded Recreation Opportunities$SPNM

0.15 Acres Construction DisturbanceFM 1501.1

$Moody Wash / Mogotsu$2B$2B$Rural and Roaded Recreation Opportunities$SPNM

0.09 Acres Operation Disturbance

Page 69: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

FM 1501.1$Moody Wash / Mogotsu$5A$5A$Big Game Winter Range (Non-Forest)$SPM

0.00 Acres Construction DisturbanceFM 1501.1

$Moody Wash / Mogotsu$5A$5A$Big Game Winter Range (Non-Forest)$SPM

0.00 Acres Operation DisturbanceFM 1501.1 $Moody Wash / Mogotsu$6A$6A$Livestock Grazing$RN 0.65 Acres Construction DisturbanceFM 1501.1 $Moody Wash / Mogotsu$6A$6A$Livestock Grazing$RN 0.41 Acres Operation DisturbanceFM 1501.1 $Moody Wash / Mogotsu$6A$6A$Livestock Grazing$SPM 0.00 Acres Construction DisturbanceFM 1501.1 $Moody Wash / Mogotsu$6A$6A$Livestock Grazing$SPM 0.00 Acres Operation DisturbanceFM 1501.1 $Moody Wash / Mogotsu$6A$6A$Livestock Grazing$SPNM 0.02 Acres Construction DisturbanceFM 1501.1 $Moody Wash / Mogotsu$6A$6A$Livestock Grazing$SPNM 0.01 Acres Operation DisturbanceFM 1501.1 Atchinson$ $ $ $ $ 0.00 Acres Construction DisturbanceFM 1501.1 Atchinson$ $ $ $ $ 0.00 Acres Operation DisturbanceFM 1501.1 Atchinson$ $1$1$General Forest Direction$RN 0.00 Acres Construction DisturbanceFM 1501.1 Atchinson$ $1$1$General Forest Direction$RN 0.00 Acres Operation DisturbanceFM 1501.1 Atchinson$ $6A$6A$Livestock Grazing$RN 0.04 Acres Construction DisturbanceFM 1501.1 Atchinson$ $6A$6A$Livestock Grazing$RN 0.01 Acres Operation DisturbanceFM 1501.1 Atchinson$ $6A$6A$Livestock Grazing$SPM 0.00 Acres Construction DisturbanceFM 1501.1 Atchinson$ $6A$6A$Livestock Grazing$SPM 0.00 Acres Operation DisturbanceFM 1501.1 Atchinson$Atchinson$ $ $ $ 0.00 Acres Construction DisturbanceFM 1501.1 Atchinson$Atchinson$ $ $ $ 0.00 Acres Operation DisturbanceFM 1501.1 Atchinson$Atchinson$1$1$General Forest Direction$RN 4.38 Acres Construction DisturbanceFM 1501.1 Atchinson$Atchinson$1$1$General Forest Direction$RN 0.93 Acres Operation DisturbanceFM 1501.1 Atchinson$Atchinson$1$1$General Forest Direction$SPM 2.36 Acres Construction DisturbanceFM 1501.1 Atchinson$Atchinson$1$1$General Forest Direction$SPM 0.50 Acres Operation DisturbanceFM 1501.1 Atchinson$Atchinson$1$1$General Forest Direction$SPNM 0.87 Acres Construction DisturbanceFM 1501.1 Atchinson$Atchinson$1$1$General Forest Direction$SPNM 0.19 Acres Operation DisturbanceFM 1501.1 Atchinson$Atchinson$6A$6A$Livestock Grazing$RN 0.14 Acres Construction DisturbanceFM 1501.1 Atchinson$Atchinson$6A$6A$Livestock Grazing$RN 0.03 Acres Operation DisturbanceFM 1501.1 Atchinson$Atchinson$6A$6A$Livestock Grazing$SPM 0.31 Acres Construction DisturbanceFM 1501.1 Atchinson$Atchinson$6A$6A$Livestock Grazing$SPM 0.07 Acres Operation DisturbanceFM 1501.1 Cove Mountain$ $1$1$General Forest Direction$SPM 1.65 Acres Construction DisturbanceFM 1501.1 Cove Mountain$ $1$1$General Forest Direction$SPM 0.35 Acres Operation DisturbanceFM 1501.1 Cove Mountain$ $6A$6A$Livestock Grazing$SPM 0.21 Acres Construction DisturbanceFM 1501.1 Cove Mountain$ $6A$6A$Livestock Grazing$SPM 0.05 Acres Operation DisturbanceFM 1501.1 Cove Mountain$Cove Mountain$1$1$General Forest Direction$SPM 3.04 Acres Construction DisturbanceFM 1501.1 Cove Mountain$Cove Mountain$1$1$General Forest Direction$SPM 0.65 Acres Operation DisturbanceFM 1501.1 Cove Mountain$Cove Mountain$1$1$General Forest Direction$SPNM 0.24 Acres Construction DisturbanceFM 1501.1 Cove Mountain$Cove Mountain$1$1$General Forest Direction$SPNM 0.05 Acres Operation DisturbanceFM 1501.1 Cove Mountain$Cove Mountain$6A$6A$Livestock Grazing$SPNM 0.01 Acres Construction DisturbanceFM 1501.1 Cove Mountain$Cove Mountain$6A$6A$Livestock Grazing$SPNM 0.00 Acres Operation DisturbanceFM 1501.1 Mogotsu$ $1$1$General Forest Direction$SPM 0.00 Acres Construction DisturbanceFM 1501.1 Mogotsu$ $1$1$General Forest Direction$SPM 0.00 Acres Operation DisturbanceFM 1501.1 Mogotsu$ $5A$5A$Big Game Winter Range (Non-Forest)$SPM 0.00 Acres Construction DisturbanceFM 1501.1 Mogotsu$ $5A$5A$Big Game Winter Range (Non-Forest)$SPM 0.00 Acres Operation DisturbanceFM 1501.1 Mogotsu$Moody Wash / Mogotsu$1$1$General Forest Direction$SPM 4.48 Acres Construction DisturbanceFM 1501.1 Mogotsu$Moody Wash / Mogotsu$1$1$General Forest Direction$SPM 0.95 Acres Operation DisturbanceFM 1501.1 Mogotsu$Moody Wash / Mogotsu$1$1$General Forest Direction$SPNM 0.00 Acres Construction Disturbance

Page 70: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

FM 1501.1 Mogotsu$Moody Wash / Mogotsu$1$1$General Forest Direction$SPNM 0.00 Acres Operation DisturbanceFM 1501.1

Mogotsu$Moody Wash / Mogotsu$5A$5A$Big Game Winter Range (Non Forest)$SPM

4.31 Acres Construction DisturbanceFM 1501.1

Mogotsu$Moody Wash / Mogotsu$5A$5A$Big Game Winter Range (Non Forest)$SPM

0.92 Acres Operation DisturbanceFM 1501.15 $ $5A$5A$Big Game Winter Range (Non-Forest)$SPM 17.24 Acres Construction DisturbanceFM 1501.15 $ $5A$5A$Big Game Winter Range (Non-Forest)$SPM 3.56 Acres Operation DisturbanceFM 1501.15

$Moody Wash / Mogotsu$5A$5A$Big Game Winter Range (Non-Forest)$SPM

0.19 Acres Construction DisturbanceFM 1501.15

$Moody Wash / Mogotsu$5A$5A$Big Game Winter Range (Non-Forest)$SPM

0.01 Acres Operation DisturbanceFM 1501.15 Mogotsu$ $5A$5A$Big Game Winter Range (Non-Forest)$SPM 0.02 Acres Construction DisturbanceFM 1501.15 Mogotsu$ $5A$5A$Big Game Winter Range (Non-Forest)$SPM 0.00 Acres Operation DisturbanceFM 1501.15

Mogotsu$Moody Wash / Mogotsu$5A$5A$Big Game Winter Range (Non Forest)$SPM

1.93 Acres Construction DisturbanceFM 1501.15

Mogotsu$Moody Wash / Mogotsu$5A$5A$Big Game Winter Range (Non Forest)$SPM

0.42 Acres Operation DisturbanceFM 1502.5 $ $5A$5A$Big Game Winter Range (Non-Forest)$SPM 45.26 Acres Construction DisturbanceFM 1502.5 $ $5A$5A$Big Game Winter Range (Non-Forest)$SPM 5.55 Acres Operation DisturbanceFM 1502.5 $ $5A$5A$Big Game Winter Range (Non-Forest)$SPNM 1.58 Acres Construction DisturbanceFM 1502.5 $ $5A$5A$Big Game Winter Range (Non-Forest)$SPNM 0.20 Acres Operation DisturbanceFM 1502.5

$Moody Wash / Mogotsu$5A$5A$Big Game Winter Range (Non-Forest)$SPM

1.35 Acres Construction DisturbanceFM 1502.5

$Moody Wash / Mogotsu$5A$5A$Big Game Winter Range (Non-Forest)$SPM

0.76 Acres Operation DisturbanceFM 1502.5

$Moody Wash / Mogotsu$5A$5A$Big Game Winter Range (Non-Forest)$SPNM

0.31 Acres Construction DisturbanceFM 1502.5

$Moody Wash / Mogotsu$5A$5A$Big Game Winter Range (Non-Forest)$SPNM

0.17 Acres Operation DisturbanceFM 1503 $ $1$1$General Forest Direction$RN 1.86 Acres Construction DisturbanceFM 1503 $ $1$1$General Forest Direction$RN 0.95 Acres Operation DisturbanceFM 1503 $ $1$1$General Forest Direction$SPM 1.56 Acres Construction DisturbanceFM 1503 $ $1$1$General Forest Direction$SPM 0.57 Acres Operation DisturbanceFM 1503 $ $1$1$General Forest Direction$SPNM 2.82 Acres Construction DisturbanceFM 1503 $ $1$1$General Forest Direction$SPNM 1.24 Acres Operation DisturbanceFM 1503 $ $2B$2B$Rural and Roaded Recreation Opportunities$RN 14.44 Acres Construction DisturbanceFM 1503 $ $2B$2B$Rural and Roaded Recreation Opportunities$RN 3.70 Acres Operation DisturbanceFM 1503 $ $6A$6A$Livestock Grazing$RN 19.50 Acres Construction DisturbanceFM 1503 $ $6A$6A$Livestock Grazing$RN 4.80 Acres Operation DisturbanceFM 1503 $ $6A$6A$Livestock Grazing$SPM 56.63 Acres Construction DisturbanceFM 1503 $ $6A$6A$Livestock Grazing$SPM 14.70 Acres Operation DisturbanceFM 1503 $ $6A$6A$Livestock Grazing$SPNM 2.08 Acres Construction DisturbanceFM 1503 $ $6A$6A$Livestock Grazing$SPNM 0.82 Acres Operation DisturbanceFM 1503 $Moody Wash / Mogotsu$ $ $ $ 0.00 Acres Construction DisturbanceFM 1503 $Moody Wash / Mogotsu$ $ $ $ 0.00 Acres Operation DisturbanceFM 1503 $Moody Wash / Mogotsu$1$1$General Forest Direction$RN 1.15 Acres Construction DisturbanceFM 1503 $Moody Wash / Mogotsu$1$1$General Forest Direction$RN 0.64 Acres Operation DisturbanceFM 1503 $Moody Wash / Mogotsu$1$1$General Forest Direction$SPM 0.02 Acres Construction DisturbanceFM 1503 $Moody Wash / Mogotsu$1$1$General Forest Direction$SPM 0.01 Acres Operation DisturbanceFM 1503 $Moody Wash / Mogotsu$1$1$General Forest Direction$SPNM 0.59 Acres Construction DisturbanceFM 1503 $Moody Wash / Mogotsu$1$1$General Forest Direction$SPNM 0.33 Acres Operation DisturbanceFM 1503

$Moody Wash / Mogotsu$2B$2B$Rural and Roaded Recreation Opportunities$RN

1.15 Acres Construction DisturbanceFM 1503

$Moody Wash / Mogotsu$2B$2B$Rural and Roaded Recreation Opportunities$RN

0.64 Acres Operation DisturbanceFM 1503

$Moody Wash / Mogotsu$2B$2B$Rural and Roaded Recreation Opportunities$SPNM

0.12 Acres Construction DisturbanceFM 1503

$Moody Wash / Mogotsu$2B$2B$Rural and Roaded Recreation Opportunities$SPNM

0.07 Acres Operation Disturbance

Page 71: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

FM 1503 $Moody Wash / Mogotsu$6A$6A$Livestock Grazing$RN 0.02 Acres Construction DisturbanceFM 1503 $Moody Wash / Mogotsu$6A$6A$Livestock Grazing$RN 0.01 Acres Operation DisturbanceFM 1503 $Moody Wash / Mogotsu$6A$6A$Livestock Grazing$SPM 1.08 Acres Construction DisturbanceFM 1503 $Moody Wash / Mogotsu$6A$6A$Livestock Grazing$SPM 0.37 Acres Operation DisturbanceFM 1503 $Moody Wash / Mogotsu$6A$6A$Livestock Grazing$SPNM 0.06 Acres Construction DisturbanceFM 1503 $Moody Wash / Mogotsu$6A$6A$Livestock Grazing$SPNM 0.03 Acres Operation DisturbanceFM 1503 Gum Hill$ $1$1$General Forest Direction$RN 1.03 Acres Construction DisturbanceFM 1503 Gum Hill$ $1$1$General Forest Direction$RN 0.23 Acres Operation DisturbanceFM 1503 Gum Hill$ $1$1$General Forest Direction$SPM 1.12 Acres Construction DisturbanceFM 1503 Gum Hill$ $1$1$General Forest Direction$SPM 0.26 Acres Operation DisturbanceFM 1503 Gum Hill$ $1$1$General Forest Direction$SPNM 2.82 Acres Construction DisturbanceFM 1503 Gum Hill$ $1$1$General Forest Direction$SPNM 0.64 Acres Operation DisturbanceFM 1503 Gum Hill$ $2B$2B$Rural and Roaded Recreation Opportunities$RN 0.51 Acres Construction DisturbanceFM 1503 Gum Hill$ $2B$2B$Rural and Roaded Recreation Opportunities$RN 0.12 Acres Operation DisturbanceFM 1503 Gum Hill$ $6A$6A$Livestock Grazing$SPNM 0.01 Acres Construction DisturbanceFM 1503 Gum Hill$ $6A$6A$Livestock Grazing$SPNM 0.00 Acres Operation DisturbanceFM 1503 Mogotsu$ $6A$6A$Livestock Grazing$RN 1.14 Acres Construction DisturbanceFM 1503 Mogotsu$ $6A$6A$Livestock Grazing$RN 0.26 Acres Operation DisturbanceFM 1503 Mogotsu$ $6A$6A$Livestock Grazing$SPM 0.06 Acres Construction DisturbanceFM 1503 Mogotsu$ $6A$6A$Livestock Grazing$SPM 0.01 Acres Operation DisturbanceFM 1503 Mogotsu$Moody Wash / Mogotsu$1$1$General Forest Direction$RN 0.03 Acres Construction DisturbanceFM 1503 Mogotsu$Moody Wash / Mogotsu$1$1$General Forest Direction$RN 0.02 Acres Operation DisturbanceFM 1503 Mogotsu$Moody Wash / Mogotsu$1$1$General Forest Direction$SPNM 0.00 Acres Construction DisturbanceFM 1503 Mogotsu$Moody Wash / Mogotsu$1$1$General Forest Direction$SPNM 0.00 Acres Operation DisturbanceFM 1503

Mogotsu$Moody Wash / Mogotsu$2B$2B$Rural and Roaded Recreation Opportunities$RN

0.03 Acres Construction DisturbanceFM 1503

Mogotsu$Moody Wash / Mogotsu$2B$2B$Rural and Roaded Recreation Opportunities$RN

0.02 Acres Operation DisturbanceFM 1503

Mogotsu$Moody Wash / Mogotsu$2B$2B$Rural and Roaded Recreation Opportunities$SPNM

0.01 Acres Construction DisturbanceFM 1503

Mogotsu$Moody Wash / Mogotsu$2B$2B$Rural and Roaded Recreation Opportunities$SPNM

0.00 Acres Operation DisturbanceFM 1503.5 $ $6A$6A$Livestock Grazing$SPM 13.90 Acres Construction DisturbanceFM 1503.5 $ $6A$6A$Livestock Grazing$SPM 1.93 Acres Operation DisturbanceFM 1504 $ $1$1$General Forest Direction$RN 0.00 Acres Construction DisturbanceFM 1504 $ $1$1$General Forest Direction$RN 0.00 Acres Operation DisturbanceFM 1504 $ $1$1$General Forest Direction$SPM 0.01 Acres Construction DisturbanceFM 1504 $ $1$1$General Forest Direction$SPM 0.00 Acres Operation DisturbanceFM 1504 $ $1$1$General Forest Direction$SPNM 0.08 Acres Construction DisturbanceFM 1504 $ $1$1$General Forest Direction$SPNM 0.02 Acres Operation DisturbanceFM 1504 $ $2B$2B$Rural and Roaded Recreation Opportunities$RN 23.50 Acres Construction DisturbanceFM 1504 $ $2B$2B$Rural and Roaded Recreation Opportunities$RN 7.27 Acres Operation DisturbanceFM 1504 $ $2B$2B$Rural and Roaded Recreation Opportunities$SPM 1.44 Acres Construction DisturbanceFM 1504 $ $2B$2B$Rural and Roaded Recreation Opportunities$SPM 0.44 Acres Operation DisturbanceFM 1504 $ $6A$6A$Livestock Grazing$RN 0.57 Acres Construction DisturbanceFM 1504 $ $6A$6A$Livestock Grazing$RN 0.19 Acres Operation DisturbanceFM 1504 $ $6A$6A$Livestock Grazing$SPM 61.85 Acres Construction DisturbanceFM 1504 $ $6A$6A$Livestock Grazing$SPM 19.05 Acres Operation DisturbanceFM 1504 $ $6A$6A$Livestock Grazing$SPNM 8.77 Acres Construction Disturbance

Page 72: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

FM 1504 $ $6A$6A$Livestock Grazing$SPNM 2.69 Acres Operation DisturbanceFM 1504 $Moody Wash / Mogotsu$6A$6A$Livestock Grazing$SPM 3.64 Acres Construction DisturbanceFM 1504 $Moody Wash / Mogotsu$6A$6A$Livestock Grazing$SPM 1.61 Acres Operation DisturbanceFM 1504 Gum Hill$ $ $ $ $ 0.01 Acres Construction DisturbanceFM 1504 Gum Hill$ $ $ $ $ 0.00 Acres Operation DisturbanceFM 1504 Gum Hill$ $1$1$General Forest Direction$RN 0.04 Acres Construction DisturbanceFM 1504 Gum Hill$ $1$1$General Forest Direction$RN 0.01 Acres Operation DisturbanceFM 1504 Gum Hill$ $1$1$General Forest Direction$SPNM 0.17 Acres Construction DisturbanceFM 1504 Gum Hill$ $1$1$General Forest Direction$SPNM 0.05 Acres Operation DisturbanceFM 1504 Gum Hill$ $2B$2B$Rural and Roaded Recreation Opportunities$RN 0.08 Acres Construction DisturbanceFM 1504 Gum Hill$ $2B$2B$Rural and Roaded Recreation Opportunities$RN 0.03 Acres Operation DisturbanceFM 1504 Gum Hill$ $6A$6A$Livestock Grazing$SPNM 0.13 Acres Construction DisturbanceFM 1504 Gum Hill$ $6A$6A$Livestock Grazing$SPNM 0.04 Acres Operation DisturbanceFM 1505 $ $1$1$General Forest Direction$SPM 5.48 Acres Construction DisturbanceFM 1505 $ $1$1$General Forest Direction$SPM 2.00 Acres Operation DisturbanceFM 1505 $ $1$1$General Forest Direction$SPNM 0.00 Acres Construction DisturbanceFM 1505 $ $1$1$General Forest Direction$SPNM 0.00 Acres Operation DisturbanceFM 1505

$ $10B#$10B#$Municipal Supply Watersheds - No Surface Occupancy Stipulation for Mineral Entry$SPM

0.38 Acres Construction DisturbanceFM 1505

$ $10B#$10B#$Municipal Supply Watersheds - No Surface Occupancy Stipulation for Mineral Entry$SPM

0.11 Acres Operation DisturbanceFM 1505 $ $5A$5A$Big Game Winter Range (Non-Forest)$SPM 0.42 Acres Construction DisturbanceFM 1505 $ $5A$5A$Big Game Winter Range (Non-Forest)$SPM 0.22 Acres Operation DisturbanceFM 1505 $ $6A$6A$Livestock Grazing$SPM 0.94 Acres Construction DisturbanceFM 1505 $ $6A$6A$Livestock Grazing$SPM 0.30 Acres Operation DisturbanceFM 1505 $Moody Wash / Mogotsu$ $ $ $ 0.08 Acres Construction DisturbanceFM 1505 $Moody Wash / Mogotsu$ $ $ $ 0.05 Acres Operation DisturbanceFM 1505 $Moody Wash / Mogotsu$1$1$General Forest Direction$SPM 48.26 Acres Construction DisturbanceFM 1505 $Moody Wash / Mogotsu$1$1$General Forest Direction$SPM 20.75 Acres Operation DisturbanceFM 1505 $Moody Wash / Mogotsu$1$1$General Forest Direction$SPNM 54.80 Acres Construction DisturbanceFM 1505 $Moody Wash / Mogotsu$1$1$General Forest Direction$SPNM 19.04 Acres Operation DisturbanceFM 1505

$Moody Wash / Mogotsu$10B#$10B#$Municipal Supply Watersheds - No Surface Occupancy Stipulation for

7.72 Acres Construction DisturbanceFM 1505

$Moody Wash / Mogotsu$10B#$10B#$Municipal Supply Watersheds - No Surface Occupancy Stipulation for

2.41 Acres Operation DisturbanceFM 1505

$Moody Wash / Mogotsu$5A$5A$Big Game Winter Range (Non-Forest)$SPM

37.24 Acres Construction DisturbanceFM 1505

$Moody Wash / Mogotsu$5A$5A$Big Game Winter Range (Non-Forest)$SPM

11.69 Acres Operation DisturbanceFM 1505

$Moody Wash / Mogotsu$5A$5A$Big Game Winter Range (Non-Forest)$SPNM

13.71 Acres Construction DisturbanceFM 1505

$Moody Wash / Mogotsu$5A$5A$Big Game Winter Range (Non-Forest)$SPNM

6.70 Acres Operation DisturbanceFM 1505 $Moody Wash / Mogotsu$6A$6A$Livestock Grazing$SPM 2.15 Acres Construction DisturbanceFM 1505 $Moody Wash / Mogotsu$6A$6A$Livestock Grazing$SPM 0.81 Acres Operation DisturbanceFM 1505 Mogotsu$Moody Wash / Mogotsu$1$1$General Forest Direction$SPM 0.00 Acres Construction DisturbanceFM 1505 Mogotsu$Moody Wash / Mogotsu$1$1$General Forest Direction$SPM 0.00 Acres Operation DisturbanceFM 1505 Moody Wash$ $1$1$General Forest Direction$SPM 0.00 Acres Construction DisturbanceFM 1505 Moody Wash$ $1$1$General Forest Direction$SPM 0.00 Acres Operation DisturbanceFM 1505

Moody Wash$Moody Wash / Mogotsu$1$1$General Forest Direction$SPM

0.08 Acres Construction DisturbanceFM 1505

Moody Wash$Moody Wash / Mogotsu$1$1$General Forest Direction$SPM

0.02 Acres Operation DisturbanceFM 1505

Moody Wash$Moody Wash / Mogotsu$1$1$General Forest Direction$SPNM

7.97 Acres Construction DisturbanceFM 1505

Moody Wash$Moody Wash / Mogotsu$1$1$General Forest Direction$SPNM

1.97 Acres Operation Disturbance

Page 73: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

FM 1506 $ $1$1$General Forest Direction$RN 14.77 Acres Construction DisturbanceFM 1506 $ $1$1$General Forest Direction$RN 3.24 Acres Operation DisturbanceFM 1506 $ $1$1$General Forest Direction$SPM 7.30 Acres Construction DisturbanceFM 1506 $ $1$1$General Forest Direction$SPM 1.77 Acres Operation DisturbanceFM 1506 $ $1$1$General Forest Direction$SPNM 0.01 Acres Construction DisturbanceFM 1506 $ $1$1$General Forest Direction$SPNM 0.01 Acres Operation DisturbanceFM 1506

$ $2B#$2B#$Rural and Roaded Recreation Opportunities - No Surface Occupancy Stipulation for Mineral

46.67 Acres Construction DisturbanceFM 1506

$ $2B#$2B#$Rural and Roaded Recreation Opportunities - No Surface Occupancy Stipulation for Mineral

9.76 Acres Operation DisturbanceFM 1506 $ $4C$4C$Wildlife Habitat (Shrub Areas)$RN 0.01 Acres Construction DisturbanceFM 1506 $ $4C$4C$Wildlife Habitat (Shrub Areas)$RN 0.00 Acres Operation DisturbanceFM 1506 $ $4C$4C$Wildlife Habitat (Shrub Areas)$SPM 0.36 Acres Construction DisturbanceFM 1506 $ $4C$4C$Wildlife Habitat (Shrub Areas)$SPM 0.17 Acres Operation DisturbanceFM 1506 $ $4C$4C$Wildlife Habitat (Shrub Areas)$SPNM 0.01 Acres Construction DisturbanceFM 1506 $ $4C$4C$Wildlife Habitat (Shrub Areas)$SPNM 0.00 Acres Operation DisturbanceFM 1506 $ $5A$5A$Big Game Winter Range (Non-Forest)$RN 0.87 Acres Construction DisturbanceFM 1506 $ $5A$5A$Big Game Winter Range (Non-Forest)$RN 0.19 Acres Operation DisturbanceFM 1506 $ $5A$5A$Big Game Winter Range (Non-Forest)$SPM 9.60 Acres Construction DisturbanceFM 1506 $ $5A$5A$Big Game Winter Range (Non-Forest)$SPM 2.48 Acres Operation DisturbanceFM 1506 $ $6A$6A$Livestock Grazing$ 0.00 Acres Construction DisturbanceFM 1506 $ $6A$6A$Livestock Grazing$ 0.00 Acres Operation DisturbanceFM 1506 $ $6A$6A$Livestock Grazing$RN 26.76 Acres Construction DisturbanceFM 1506 $ $6A$6A$Livestock Grazing$RN 6.44 Acres Operation DisturbanceFM 1506 $ $6A$6A$Livestock Grazing$SPM 118.16 Acres Construction DisturbanceFM 1506 $ $6A$6A$Livestock Grazing$SPM 23.41 Acres Operation DisturbanceFM 1506 $ $6A$6A$Livestock Grazing$SPNM 4.68 Acres Construction DisturbanceFM 1506 $ $6A$6A$Livestock Grazing$SPNM 0.99 Acres Operation DisturbanceFM 1506 $ $9A$9A$Riparian Management$ 0.00 Acres Construction DisturbanceFM 1506 $ $9A$9A$Riparian Management$ 0.00 Acres Operation DisturbanceFM 1506 $ $9A$9A$Riparian Management$RN 2.68 Acres Construction DisturbanceFM 1506 $ $9A$9A$Riparian Management$RN 0.52 Acres Operation DisturbanceFM 1506 $ $9A$9A$Riparian Management$SPM 2.90 Acres Construction DisturbanceFM 1506 $ $9A$9A$Riparian Management$SPM 0.57 Acres Operation DisturbanceFM 1506 $Atchinson$ $ $ $ 0.00 Acres Construction DisturbanceFM 1506 $Atchinson$ $ $ $ 0.00 Acres Operation DisturbanceFM 1506 $Atchinson$1$1$General Forest Direction$RN 3.68 Acres Construction DisturbanceFM 1506 $Atchinson$1$1$General Forest Direction$RN 1.71 Acres Operation DisturbanceFM 1506 $Atchinson$1$1$General Forest Direction$SPM 1.58 Acres Construction DisturbanceFM 1506 $Atchinson$1$1$General Forest Direction$SPM 0.73 Acres Operation DisturbanceFM 1506 $Atchinson$1$1$General Forest Direction$SPNM 0.59 Acres Construction DisturbanceFM 1506 $Atchinson$1$1$General Forest Direction$SPNM 0.27 Acres Operation DisturbanceFM 1506

$Atchinson$2B#$2B#$Rural and Roaded Recreation Opportunities - No Surface Occupancy Stipulation for

0.02 Acres Construction DisturbanceFM 1506

$Atchinson$2B#$2B#$Rural and Roaded Recreation Opportunities - No Surface Occupancy Stipulation for

0.01 Acres Operation DisturbanceFM 1506 $Atchinson$4C$4C$Wildlife Habitat (Shrub Areas)$RN 0.04 Acres Construction DisturbanceFM 1506 $Atchinson$4C$4C$Wildlife Habitat (Shrub Areas)$RN 0.02 Acres Operation DisturbanceFM 1506 $Atchinson$4C$4C$Wildlife Habitat (Shrub Areas)$SPM 3.38 Acres Construction Disturbance

Page 74: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

FM 1506 $Atchinson$4C$4C$Wildlife Habitat (Shrub Areas)$SPM 1.57 Acres Operation DisturbanceFM 1506 $Atchinson$4C$4C$Wildlife Habitat (Shrub Areas)$SPNM 5.21 Acres Construction DisturbanceFM 1506 $Atchinson$4C$4C$Wildlife Habitat (Shrub Areas)$SPNM 2.41 Acres Operation DisturbanceFM 1506 $Atchinson$6A$6A$Livestock Grazing$RN 0.11 Acres Construction DisturbanceFM 1506 $Atchinson$6A$6A$Livestock Grazing$RN 0.05 Acres Operation DisturbanceFM 1506 $Atchinson$6A$6A$Livestock Grazing$SPM 2.35 Acres Construction DisturbanceFM 1506 $Atchinson$6A$6A$Livestock Grazing$SPM 1.09 Acres Operation DisturbanceFM 1506 $Atchinson$6A$6A$Livestock Grazing$SPNM 0.56 Acres Construction DisturbanceFM 1506 $Atchinson$6A$6A$Livestock Grazing$SPNM 0.26 Acres Operation DisturbanceFM 1506 $Cove Mountain$ $ $ $ 0.00 Acres Construction DisturbanceFM 1506 $Cove Mountain$ $ $ $ 0.00 Acres Operation DisturbanceFM 1506 $Cove Mountain$1$1$General Forest Direction$RN 1.11 Acres Construction DisturbanceFM 1506 $Cove Mountain$1$1$General Forest Direction$RN 0.52 Acres Operation DisturbanceFM 1506 $Cove Mountain$1$1$General Forest Direction$SPM 0.01 Acres Construction DisturbanceFM 1506 $Cove Mountain$1$1$General Forest Direction$SPM 0.00 Acres Operation DisturbanceFM 1506 $Cove Mountain$1$1$General Forest Direction$SPNM 0.38 Acres Construction DisturbanceFM 1506 $Cove Mountain$1$1$General Forest Direction$SPNM 0.17 Acres Operation DisturbanceFM 1506 $Cove Mountain$6A$6A$Livestock Grazing$RN 0.20 Acres Construction DisturbanceFM 1506 $Cove Mountain$6A$6A$Livestock Grazing$RN 0.09 Acres Operation DisturbanceFM 1506 $Cove Mountain$9A$9A$Riparian Management$RN 0.12 Acres Construction DisturbanceFM 1506 $Cove Mountain$9A$9A$Riparian Management$RN 0.05 Acres Operation DisturbanceFM 1506 $Kane Mountain$ $ $ $ 0.03 Acres Construction DisturbanceFM 1506 $Kane Mountain$ $ $ $ 0.01 Acres Operation DisturbanceFM 1506 $Kane Mountain$1$1$General Forest Direction$ 0.00 Acres Construction DisturbanceFM 1506 $Kane Mountain$1$1$General Forest Direction$ 0.00 Acres Operation DisturbanceFM 1506 $Kane Mountain$1$1$General Forest Direction$RN 6.50 Acres Construction DisturbanceFM 1506 $Kane Mountain$1$1$General Forest Direction$RN 1.75 Acres Operation DisturbanceFM 1506 $Kane Mountain$1$1$General Forest Direction$SPM 0.16 Acres Construction DisturbanceFM 1506 $Kane Mountain$1$1$General Forest Direction$SPM 0.07 Acres Operation DisturbanceFM 1506 $Kane Mountain$1$1$General Forest Direction$SPNM 2.15 Acres Construction DisturbanceFM 1506 $Kane Mountain$1$1$General Forest Direction$SPNM 1.00 Acres Operation DisturbanceFM 1506 $Kane Mountain$6A$6A$Livestock Grazing$RN 0.95 Acres Construction DisturbanceFM 1506 $Kane Mountain$6A$6A$Livestock Grazing$RN 0.28 Acres Operation DisturbanceFM 1506 $Kane Mountain$6A$6A$Livestock Grazing$SPM 0.03 Acres Construction DisturbanceFM 1506 $Kane Mountain$6A$6A$Livestock Grazing$SPM 0.01 Acres Operation DisturbanceFM 1506 $Kane Mountain$6A$6A$Livestock Grazing$SPNM 0.04 Acres Construction DisturbanceFM 1506 $Kane Mountain$6A$6A$Livestock Grazing$SPNM 0.02 Acres Operation DisturbanceFM 1506 $Kane Mountain$9A$9A$Riparian Management$ 0.00 Acres Construction DisturbanceFM 1506 $Kane Mountain$9A$9A$Riparian Management$ 0.00 Acres Operation DisturbanceFM 1506 $Kane Mountain$9A$9A$Riparian Management$RN 0.17 Acres Construction DisturbanceFM 1506 $Kane Mountain$9A$9A$Riparian Management$RN 0.06 Acres Operation DisturbanceFM 1506 $Pine Valley Mountain$ $ $ $ 0.07 Acres Construction DisturbanceFM 1506 $Pine Valley Mountain$ $ $ $ 0.01 Acres Operation DisturbanceFM 1506 $Pine Valley Mountain$1$1$General Forest Direction$RN 9.18 Acres Construction DisturbanceFM 1506 $Pine Valley Mountain$1$1$General Forest Direction$RN 2.11 Acres Operation Disturbance

Page 75: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

FM 1506 $Pine Valley Mountain$1$1$General Forest Direction$SPM 5.59 Acres Construction DisturbanceFM 1506 $Pine Valley Mountain$1$1$General Forest Direction$SPM 2.59 Acres Operation DisturbanceFM 1506 $Pine Valley Mountain$1$1$General Forest Direction$SPNM 1.69 Acres Construction DisturbanceFM 1506 $Pine Valley Mountain$1$1$General Forest Direction$SPNM 0.78 Acres Operation DisturbanceFM 1506

$Pine Valley Mountain$10B#$10B#$Municipal Supply Watersheds - No Surface Occupancy Stipulation for

0.25 Acres Construction DisturbanceFM 1506

$Pine Valley Mountain$10B#$10B#$Municipal Supply Watersheds - No Surface Occupancy Stipulation for

0.12 Acres Operation DisturbanceFM 1506 $Pine Valley Mountain$4C$4C$Wildlife Habitat (Shrub Areas)$SPM 1.90 Acres Construction DisturbanceFM 1506 $Pine Valley Mountain$4C$4C$Wildlife Habitat (Shrub Areas)$SPM 0.88 Acres Operation DisturbanceFM 1506 $Pine Valley Mountain$4C$4C$Wildlife Habitat (Shrub Areas)$SPNM 3.48 Acres Construction DisturbanceFM 1506 $Pine Valley Mountain$4C$4C$Wildlife Habitat (Shrub Areas)$SPNM 1.61 Acres Operation DisturbanceFM 1506 $Pine Valley Mountain$6A$6A$Livestock Grazing$ 0.00 Acres Construction DisturbanceFM 1506 $Pine Valley Mountain$6A$6A$Livestock Grazing$ 0.00 Acres Operation DisturbanceFM 1506 $Pine Valley Mountain$6A$6A$Livestock Grazing$RN 5.78 Acres Construction DisturbanceFM 1506 $Pine Valley Mountain$6A$6A$Livestock Grazing$RN 1.19 Acres Operation DisturbanceFM 1506 $Pine Valley Mountain$6A$6A$Livestock Grazing$SPM 2.30 Acres Construction DisturbanceFM 1506 $Pine Valley Mountain$6A$6A$Livestock Grazing$SPM 1.07 Acres Operation DisturbanceFM 1506 $Pine Valley Mountain$6A$6A$Livestock Grazing$SPNM 2.82 Acres Construction DisturbanceFM 1506 $Pine Valley Mountain$6A$6A$Livestock Grazing$SPNM 1.31 Acres Operation DisturbanceFM 1506 $Pine Valley Mountain$9A$9A$Riparian Management$RN 1.47 Acres Construction DisturbanceFM 1506 $Pine Valley Mountain$9A$9A$Riparian Management$RN 0.30 Acres Operation DisturbanceFM 1506 $Pine Valley Mountain$9A$9A$Riparian Management$SPM 0.05 Acres Construction DisturbanceFM 1506 $Pine Valley Mountain$9A$9A$Riparian Management$SPM 0.02 Acres Operation DisturbanceFM 1506 $Pine Valley Mountain$9A$9A$Riparian Management$SPNM 0.00 Acres Construction DisturbanceFM 1506 $Pine Valley Mountain$9A$9A$Riparian Management$SPNM 0.00 Acres Operation DisturbanceFRCC-FBFM40 1210 GR1 24.03 Acres Construction DisturbanceFRCC-FBFM40 1210 GR1 4.84 Acres Operation DisturbanceFRCC-FBFM40 1210 GR2 51.73 Acres Construction DisturbanceFRCC-FBFM40 1210 GR2 8.23 Acres Operation DisturbanceFRCC-FBFM40 1210 GS1 80.97 Acres Construction DisturbanceFRCC-FBFM40 1210 GS1 15.44 Acres Operation DisturbanceFRCC-FBFM40 1210 GS2 143.90 Acres Construction DisturbanceFRCC-FBFM40 1210 GS2 30.22 Acres Operation DisturbanceFRCC-FBFM40 1210 NB1 1.73 Acres Construction DisturbanceFRCC-FBFM40 1210 NB1 0.39 Acres Operation DisturbanceFRCC-FBFM40 1210 NB3 0.00 Acres Construction DisturbanceFRCC-FBFM40 1210 NB3 0.00 Acres Operation DisturbanceFRCC-FBFM40 1210 NB8 0.02 Acres Construction DisturbanceFRCC-FBFM40 1210 NB8 0.01 Acres Operation DisturbanceFRCC-FBFM40 1210 NB9 0.16 Acres Construction DisturbanceFRCC-FBFM40 1210 NB9 0.07 Acres Operation DisturbanceFRCC-FBFM40 1210 SH1 6.44 Acres Construction DisturbanceFRCC-FBFM40 1210 SH1 1.40 Acres Operation DisturbanceFRCC-FBFM40 1210 SH2 1.66 Acres Construction DisturbanceFRCC-FBFM40 1210 SH2 0.42 Acres Operation DisturbanceFRCC-FBFM40 1210 SH5 1.32 Acres Construction Disturbance

Page 76: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

FRCC-FBFM40 1210 SH5 0.52 Acres Operation DisturbanceFRCC-FBFM40 1210 SH7 0.00 Acres Construction DisturbanceFRCC-FBFM40 1210 SH7 0.00 Acres Operation DisturbanceFRCC-FBFM40 1210 TL3 0.30 Acres Construction DisturbanceFRCC-FBFM40 1210 TL3 0.08 Acres Operation DisturbanceFRCC-FBFM40 1210 TL5 0.00 Acres Construction DisturbanceFRCC-FBFM40 1210 TL5 0.00 Acres Operation DisturbanceFRCC-FBFM40 1211 GR1 16.61 Acres Construction DisturbanceFRCC-FBFM40 1211 GR1 3.79 Acres Operation DisturbanceFRCC-FBFM40 1211 GR2 6.01 Acres Construction DisturbanceFRCC-FBFM40 1211 GR2 1.38 Acres Operation DisturbanceFRCC-FBFM40 1211 GS1 16.50 Acres Construction DisturbanceFRCC-FBFM40 1211 GS1 3.85 Acres Operation DisturbanceFRCC-FBFM40 1211 GS2 56.64 Acres Construction DisturbanceFRCC-FBFM40 1211 GS2 13.21 Acres Operation DisturbanceFRCC-FBFM40 1211 NB1 0.48 Acres Construction DisturbanceFRCC-FBFM40 1211 NB1 0.11 Acres Operation DisturbanceFRCC-FBFM40 1211 NB3 0.01 Acres Construction DisturbanceFRCC-FBFM40 1211 NB3 0.00 Acres Operation DisturbanceFRCC-FBFM40 1211 NB9 0.69 Acres Construction DisturbanceFRCC-FBFM40 1211 NB9 0.17 Acres Operation DisturbanceFRCC-FBFM40 1211 SH1 4.73 Acres Construction DisturbanceFRCC-FBFM40 1211 SH1 1.09 Acres Operation DisturbanceFRCC-FBFM40 1211 SH2 0.10 Acres Construction DisturbanceFRCC-FBFM40 1211 SH2 0.03 Acres Operation DisturbanceFRCC-FBFM40 1211 SH5 1.09 Acres Construction DisturbanceFRCC-FBFM40 1211 SH5 0.25 Acres Operation DisturbanceFRCC-FBFM40 1211 TL3 0.10 Acres Construction DisturbanceFRCC-FBFM40 1211 TL3 0.02 Acres Operation DisturbanceFRCC-FBFM40 1212 GR1 75.29 Acres Construction DisturbanceFRCC-FBFM40 1212 GR1 29.49 Acres Operation DisturbanceFRCC-FBFM40 1212 GR2 7.07 Acres Construction DisturbanceFRCC-FBFM40 1212 GR2 2.62 Acres Operation DisturbanceFRCC-FBFM40 1212 GS1 57.07 Acres Construction DisturbanceFRCC-FBFM40 1212 GS1 23.24 Acres Operation DisturbanceFRCC-FBFM40 1212 GS2 25.07 Acres Construction DisturbanceFRCC-FBFM40 1212 GS2 10.21 Acres Operation DisturbanceFRCC-FBFM40 1212 NB1 1.30 Acres Construction DisturbanceFRCC-FBFM40 1212 NB1 0.49 Acres Operation DisturbanceFRCC-FBFM40 1212 NB8 0.00 Acres Construction DisturbanceFRCC-FBFM40 1212 NB8 0.00 Acres Operation DisturbanceFRCC-FBFM40 1212 NB9 21.62 Acres Construction DisturbanceFRCC-FBFM40 1212 NB9 9.20 Acres Operation DisturbanceFRCC-FBFM40 1212 SH1 39.57 Acres Construction DisturbanceFRCC-FBFM40 1212 SH1 17.57 Acres Operation Disturbance

Page 77: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

FRCC-FBFM40 1212 SH2 0.08 Acres Construction DisturbanceFRCC-FBFM40 1212 SH2 0.03 Acres Operation DisturbanceFRCC-FBFM40 1212 SH5 0.02 Acres Construction DisturbanceFRCC-FBFM40 1212 SH5 0.01 Acres Operation DisturbanceFRCC-FBFM40 1214 GR1 14.99 Acres Construction DisturbanceFRCC-FBFM40 1214 GR1 3.87 Acres Operation DisturbanceFRCC-FBFM40 1214 GR2 26.35 Acres Construction DisturbanceFRCC-FBFM40 1214 GR2 5.78 Acres Operation DisturbanceFRCC-FBFM40 1214 GS1 30.11 Acres Construction DisturbanceFRCC-FBFM40 1214 GS1 6.91 Acres Operation DisturbanceFRCC-FBFM40 1214 GS2 59.74 Acres Construction DisturbanceFRCC-FBFM40 1214 GS2 13.70 Acres Operation DisturbanceFRCC-FBFM40 1214 NB1 0.45 Acres Construction DisturbanceFRCC-FBFM40 1214 NB1 0.12 Acres Operation DisturbanceFRCC-FBFM40 1214 NB3 0.01 Acres Construction DisturbanceFRCC-FBFM40 1214 NB3 0.00 Acres Operation DisturbanceFRCC-FBFM40 1214 NB9 2.72 Acres Construction DisturbanceFRCC-FBFM40 1214 NB9 0.58 Acres Operation DisturbanceFRCC-FBFM40 1214 SH1 10.47 Acres Construction DisturbanceFRCC-FBFM40 1214 SH1 2.52 Acres Operation DisturbanceFRCC-FBFM40 1214 SH2 0.06 Acres Construction DisturbanceFRCC-FBFM40 1214 SH2 0.01 Acres Operation DisturbanceFRCC-FBFM40 1214 SH5 0.46 Acres Construction DisturbanceFRCC-FBFM40 1214 SH5 0.09 Acres Operation DisturbanceFRCC-FBFM40 1214 TL3 0.01 Acres Construction DisturbanceFRCC-FBFM40 1214 TL3 0.00 Acres Operation DisturbanceFRCC-FBFM40 1215 GR1 1.75 Acres Construction DisturbanceFRCC-FBFM40 1215 GR1 0.39 Acres Operation DisturbanceFRCC-FBFM40 1215 GR2 26.48 Acres Construction DisturbanceFRCC-FBFM40 1215 GR2 5.77 Acres Operation DisturbanceFRCC-FBFM40 1215 GS1 27.08 Acres Construction DisturbanceFRCC-FBFM40 1215 GS1 6.03 Acres Operation DisturbanceFRCC-FBFM40 1215 GS2 32.09 Acres Construction DisturbanceFRCC-FBFM40 1215 GS2 7.03 Acres Operation DisturbanceFRCC-FBFM40 1215 NB1 0.56 Acres Construction DisturbanceFRCC-FBFM40 1215 NB1 0.12 Acres Operation DisturbanceFRCC-FBFM40 1215 NB8 0.00 Acres Construction DisturbanceFRCC-FBFM40 1215 NB8 0.00 Acres Operation DisturbanceFRCC-FBFM40 1215 NB9 0.41 Acres Construction DisturbanceFRCC-FBFM40 1215 NB9 0.10 Acres Operation DisturbanceFRCC-FBFM40 1215 SH1 4.10 Acres Construction DisturbanceFRCC-FBFM40 1215 SH1 0.95 Acres Operation DisturbanceFRCC-FBFM40 1215 SH2 0.01 Acres Construction DisturbanceFRCC-FBFM40 1215 SH2 0.00 Acres Operation DisturbanceFRCC-FBFM40 1215 SH5 0.00 Acres Construction Disturbance

Page 78: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

FRCC-FBFM40 1215 SH5 0.00 Acres Operation DisturbanceFRCC-FBFM40 1215 TL3 0.00 Acres Construction DisturbanceFRCC-FBFM40 1215 TL3 0.00 Acres Operation DisturbanceFRCC-FBFM40 1215.05 GR1 24.49 Acres Construction DisturbanceFRCC-FBFM40 1215.05 GR1 7.51 Acres Operation DisturbanceFRCC-FBFM40 1215.05 GR2 8.24 Acres Construction DisturbanceFRCC-FBFM40 1215.05 GR2 2.60 Acres Operation DisturbanceFRCC-FBFM40 1215.05 GS1 35.01 Acres Construction DisturbanceFRCC-FBFM40 1215.05 GS1 10.87 Acres Operation DisturbanceFRCC-FBFM40 1215.05 GS2 27.01 Acres Construction DisturbanceFRCC-FBFM40 1215.05 GS2 8.33 Acres Operation DisturbanceFRCC-FBFM40 1215.05 NB1 0.32 Acres Construction DisturbanceFRCC-FBFM40 1215.05 NB1 0.14 Acres Operation DisturbanceFRCC-FBFM40 1215.05 NB8 0.00 Acres Construction DisturbanceFRCC-FBFM40 1215.05 NB8 0.00 Acres Operation DisturbanceFRCC-FBFM40 1215.05 NB9 24.40 Acres Construction DisturbanceFRCC-FBFM40 1215.05 NB9 6.99 Acres Operation DisturbanceFRCC-FBFM40 1215.05 SH1 21.20 Acres Construction DisturbanceFRCC-FBFM40 1215.05 SH1 6.49 Acres Operation DisturbanceFRCC-FBFM40 1215.05 SH2 0.02 Acres Construction DisturbanceFRCC-FBFM40 1215.05 SH2 0.01 Acres Operation DisturbanceFRCC-FBFM40 1320.05 GR1 142.90 Acres Construction DisturbanceFRCC-FBFM40 1320.05 GR1 23.89 Acres Operation DisturbanceFRCC-FBFM40 1320.05 GR2 21.19 Acres Construction DisturbanceFRCC-FBFM40 1320.05 GR2 3.95 Acres Operation DisturbanceFRCC-FBFM40 1320.05 GS1 153.40 Acres Construction DisturbanceFRCC-FBFM40 1320.05 GS1 25.01 Acres Operation DisturbanceFRCC-FBFM40 1320.05 GS2 87.71 Acres Construction DisturbanceFRCC-FBFM40 1320.05 GS2 14.02 Acres Operation DisturbanceFRCC-FBFM40 1320.05 NB1 7.96 Acres Construction DisturbanceFRCC-FBFM40 1320.05 NB1 1.41 Acres Operation DisturbanceFRCC-FBFM40 1320.05 NB3 28.73 Acres Construction DisturbanceFRCC-FBFM40 1320.05 NB3 5.16 Acres Operation DisturbanceFRCC-FBFM40 1320.05 NB8 6.26 Acres Construction DisturbanceFRCC-FBFM40 1320.05 NB8 1.23 Acres Operation DisturbanceFRCC-FBFM40 1320.05 NB9 11.03 Acres Construction DisturbanceFRCC-FBFM40 1320.05 NB9 2.26 Acres Operation DisturbanceFRCC-FBFM40 1320.05 SH1 30.92 Acres Construction DisturbanceFRCC-FBFM40 1320.05 SH1 5.35 Acres Operation DisturbanceFRCC-FBFM40 1320.05 SH2 2.32 Acres Construction DisturbanceFRCC-FBFM40 1320.05 SH2 0.39 Acres Operation DisturbanceFRCC-FBFM40 1320.05 SH5 4.05 Acres Construction DisturbanceFRCC-FBFM40 1320.05 SH5 0.71 Acres Operation DisturbanceFRCC-FBFM40 1320.05 SH7 0.03 Acres Construction DisturbanceFRCC-FBFM40 1320.05 SH7 0.01 Acres Operation Disturbance

Page 79: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

FRCC-FBFM40 1320.05 TL2 0.05 Acres Construction DisturbanceFRCC-FBFM40 1320.05 TL2 0.01 Acres Operation DisturbanceFRCC-FBFM40 1320.05 TL3 1.28 Acres Construction DisturbanceFRCC-FBFM40 1320.05 TL3 0.20 Acres Operation DisturbanceFRCC-FBFM40 1320.05 TL5 1.39 Acres Construction DisturbanceFRCC-FBFM40 1320.05 TL5 0.22 Acres Operation DisturbanceFRCC-FBFM40 1320.05 TL6 0.08 Acres Construction DisturbanceFRCC-FBFM40 1320.05 TL6 0.01 Acres Operation DisturbanceFRCC-FBFM40 1320.05 TL8 0.02 Acres Construction DisturbanceFRCC-FBFM40 1320.05 TL8 0.00 Acres Operation DisturbanceFRCC-FBFM40 1320.05 TU1 0.22 Acres Construction DisturbanceFRCC-FBFM40 1320.05 TU1 0.03 Acres Operation DisturbanceFRCC-FBFM40 1320.15 GR1 25.31 Acres Construction DisturbanceFRCC-FBFM40 1320.15 GR1 10.80 Acres Operation DisturbanceFRCC-FBFM40 1320.15 GR2 11.77 Acres Construction DisturbanceFRCC-FBFM40 1320.15 GR2 5.16 Acres Operation DisturbanceFRCC-FBFM40 1320.15 GS1 68.60 Acres Construction DisturbanceFRCC-FBFM40 1320.15 GS1 28.26 Acres Operation DisturbanceFRCC-FBFM40 1320.15 GS2 177.89 Acres Construction DisturbanceFRCC-FBFM40 1320.15 GS2 69.59 Acres Operation DisturbanceFRCC-FBFM40 1320.15 NB1 4.36 Acres Construction DisturbanceFRCC-FBFM40 1320.15 NB1 2.04 Acres Operation DisturbanceFRCC-FBFM40 1320.15 NB3 2.15 Acres Construction DisturbanceFRCC-FBFM40 1320.15 NB3 1.22 Acres Operation DisturbanceFRCC-FBFM40 1320.15 NB8 0.01 Acres Construction DisturbanceFRCC-FBFM40 1320.15 NB8 0.00 Acres Operation DisturbanceFRCC-FBFM40 1320.15 NB9 0.53 Acres Construction DisturbanceFRCC-FBFM40 1320.15 NB9 0.25 Acres Operation DisturbanceFRCC-FBFM40 1320.15 SH1 0.44 Acres Construction DisturbanceFRCC-FBFM40 1320.15 SH1 0.26 Acres Operation DisturbanceFRCC-FBFM40 1320.15 SH2 1.58 Acres Construction DisturbanceFRCC-FBFM40 1320.15 SH2 0.67 Acres Operation DisturbanceFRCC-FBFM40 1320.15 SH5 83.23 Acres Construction DisturbanceFRCC-FBFM40 1320.15 SH5 31.15 Acres Operation DisturbanceFRCC-FBFM40 1320.15 SH7 71.92 Acres Construction DisturbanceFRCC-FBFM40 1320.15 SH7 27.40 Acres Operation DisturbanceFRCC-FBFM40 1320.15 TL2 0.49 Acres Construction DisturbanceFRCC-FBFM40 1320.15 TL2 0.23 Acres Operation DisturbanceFRCC-FBFM40 1320.15 TL3 22.20 Acres Construction DisturbanceFRCC-FBFM40 1320.15 TL3 8.95 Acres Operation DisturbanceFRCC-FBFM40 1320.15 TL5 0.16 Acres Construction DisturbanceFRCC-FBFM40 1320.15 TL5 0.07 Acres Operation DisturbanceFRCC-FBFM40 1320.15 TL6 0.46 Acres Construction DisturbanceFRCC-FBFM40 1320.15 TL6 0.23 Acres Operation DisturbanceFRCC-FBFM40 1320.15 TL8 0.02 Acres Construction Disturbance

Page 80: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

FRCC-FBFM40 1320.15 TL8 0.01 Acres Operation DisturbanceFRCC-FBFM40 1320.15 TU1 19.23 Acres Construction DisturbanceFRCC-FBFM40 1320.15 TU1 7.74 Acres Operation DisturbanceFRCC-FBFM40 1320.15 TU5 11.44 Acres Construction DisturbanceFRCC-FBFM40 1320.15 TU5 4.06 Acres Operation DisturbanceFRCC-FBFM40 1320.2 GR1 57.72 Acres Construction DisturbanceFRCC-FBFM40 1320.2 GR1 20.83 Acres Operation DisturbanceFRCC-FBFM40 1320.2 GR2 21.86 Acres Construction DisturbanceFRCC-FBFM40 1320.2 GR2 9.04 Acres Operation DisturbanceFRCC-FBFM40 1320.2 GS1 17.44 Acres Construction DisturbanceFRCC-FBFM40 1320.2 GS1 7.01 Acres Operation DisturbanceFRCC-FBFM40 1320.2 GS2 0.26 Acres Construction DisturbanceFRCC-FBFM40 1320.2 GS2 0.19 Acres Operation DisturbanceFRCC-FBFM40 1320.2 NB1 1.06 Acres Construction DisturbanceFRCC-FBFM40 1320.2 NB1 0.40 Acres Operation DisturbanceFRCC-FBFM40 1320.2 NB3 1.85 Acres Construction DisturbanceFRCC-FBFM40 1320.2 NB3 0.66 Acres Operation DisturbanceFRCC-FBFM40 1320.2 NB8 0.01 Acres Construction DisturbanceFRCC-FBFM40 1320.2 NB8 0.00 Acres Operation DisturbanceFRCC-FBFM40 1320.2 NB9 2.64 Acres Construction DisturbanceFRCC-FBFM40 1320.2 NB9 1.04 Acres Operation DisturbanceFRCC-FBFM40 1320.2 SH2 14.84 Acres Construction DisturbanceFRCC-FBFM40 1320.2 SH2 5.33 Acres Operation DisturbanceFRCC-FBFM40 1320.2 SH5 0.01 Acres Construction DisturbanceFRCC-FBFM40 1320.2 SH5 0.01 Acres Operation DisturbanceFRCC-FBFM40 1320.2 SH7 0.40 Acres Construction DisturbanceFRCC-FBFM40 1320.2 SH7 0.28 Acres Operation DisturbanceFRCC-FBFM40 1320.2 TL1 0.66 Acres Construction DisturbanceFRCC-FBFM40 1320.2 TL1 0.25 Acres Operation DisturbanceFRCC-FBFM40 1320.2 TL2 0.07 Acres Construction DisturbanceFRCC-FBFM40 1320.2 TL2 0.03 Acres Operation DisturbanceFRCC-FBFM40 1320.2 TL3 0.62 Acres Construction DisturbanceFRCC-FBFM40 1320.2 TL3 0.34 Acres Operation DisturbanceFRCC-FBFM40 1320.2 TL5 0.27 Acres Construction DisturbanceFRCC-FBFM40 1320.2 TL5 0.08 Acres Operation DisturbanceFRCC-FBFM40 1320.2 TL6 0.29 Acres Construction DisturbanceFRCC-FBFM40 1320.2 TL6 0.09 Acres Operation DisturbanceFRCC-FBFM40 1320.2 TU1 0.23 Acres Construction DisturbanceFRCC-FBFM40 1320.2 TU1 0.16 Acres Operation DisturbanceFRCC-FBFM40 1320.2 TU5 0.03 Acres Construction DisturbanceFRCC-FBFM40 1320.2 TU5 0.02 Acres Operation DisturbanceFRCC-FBFM40 1320.21 GR1 2.55 Acres Construction DisturbanceFRCC-FBFM40 1320.21 GR1 0.99 Acres Operation DisturbanceFRCC-FBFM40 1320.21 GR2 1.02 Acres Construction DisturbanceFRCC-FBFM40 1320.21 GR2 0.34 Acres Operation Disturbance

Page 81: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

FRCC-FBFM40 1320.21 GS1 0.47 Acres Construction DisturbanceFRCC-FBFM40 1320.21 GS1 0.17 Acres Operation DisturbanceFRCC-FBFM40 1320.21 NB1 0.15 Acres Construction DisturbanceFRCC-FBFM40 1320.21 NB1 0.05 Acres Operation DisturbanceFRCC-FBFM40 1320.21 NB3 0.06 Acres Construction DisturbanceFRCC-FBFM40 1320.21 NB3 0.02 Acres Operation DisturbanceFRCC-FBFM40 1320.21 NB9 0.43 Acres Construction DisturbanceFRCC-FBFM40 1320.21 NB9 0.15 Acres Operation DisturbanceFRCC-FBFM40 1320.21 SH2 0.80 Acres Construction DisturbanceFRCC-FBFM40 1320.21 SH2 0.39 Acres Operation DisturbanceFRCC-FBFM40 1320.21 TL1 0.09 Acres Construction DisturbanceFRCC-FBFM40 1320.21 TL1 0.04 Acres Operation DisturbanceFRCC-FBFM40 1320.21 TL3 0.04 Acres Construction DisturbanceFRCC-FBFM40 1320.21 TL3 0.01 Acres Operation DisturbanceFRCC-FBFM40 1321.01 GR1 82.97 Acres Construction DisturbanceFRCC-FBFM40 1321.01 GR1 10.89 Acres Operation DisturbanceFRCC-FBFM40 1321.01 GR2 5.48 Acres Construction DisturbanceFRCC-FBFM40 1321.01 GR2 1.22 Acres Operation DisturbanceFRCC-FBFM40 1321.01 GS1 74.47 Acres Construction DisturbanceFRCC-FBFM40 1321.01 GS1 15.08 Acres Operation DisturbanceFRCC-FBFM40 1321.01 GS2 151.22 Acres Construction DisturbanceFRCC-FBFM40 1321.01 GS2 28.34 Acres Operation DisturbanceFRCC-FBFM40 1321.01 NB1 3.02 Acres Construction DisturbanceFRCC-FBFM40 1321.01 NB1 0.65 Acres Operation DisturbanceFRCC-FBFM40 1321.01 NB3 10.94 Acres Construction DisturbanceFRCC-FBFM40 1321.01 NB3 2.02 Acres Operation DisturbanceFRCC-FBFM40 1321.01 NB8 0.95 Acres Construction DisturbanceFRCC-FBFM40 1321.01 NB8 0.29 Acres Operation DisturbanceFRCC-FBFM40 1321.01 NB9 2.90 Acres Construction DisturbanceFRCC-FBFM40 1321.01 NB9 0.70 Acres Operation DisturbanceFRCC-FBFM40 1321.01 SH1 64.16 Acres Construction DisturbanceFRCC-FBFM40 1321.01 SH1 11.89 Acres Operation DisturbanceFRCC-FBFM40 1321.01 SH2 0.13 Acres Construction DisturbanceFRCC-FBFM40 1321.01 SH2 0.03 Acres Operation DisturbanceFRCC-FBFM40 1321.01 SH5 8.22 Acres Construction DisturbanceFRCC-FBFM40 1321.01 SH5 1.89 Acres Operation DisturbanceFRCC-FBFM40 1321.01 SH7 0.01 Acres Construction DisturbanceFRCC-FBFM40 1321.01 SH7 0.00 Acres Operation DisturbanceFRCC-FBFM40 1321.01 TL2 0.07 Acres Construction DisturbanceFRCC-FBFM40 1321.01 TL2 0.01 Acres Operation DisturbanceFRCC-FBFM40 1321.01 TL3 1.88 Acres Construction DisturbanceFRCC-FBFM40 1321.01 TL3 0.48 Acres Operation DisturbanceFRCC-FBFM40 1321.01 TL5 0.72 Acres Construction DisturbanceFRCC-FBFM40 1321.01 TL5 0.16 Acres Operation DisturbanceFRCC-FBFM40 1321.01 TL6 0.11 Acres Construction Disturbance

Page 82: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

FRCC-FBFM40 1321.01 TL6 0.03 Acres Operation DisturbanceFRCC-FBFM40 1321.01 TL8 0.03 Acres Construction DisturbanceFRCC-FBFM40 1321.01 TL8 0.01 Acres Operation DisturbanceFRCC-FBFM40 1321.01 TU1 0.10 Acres Construction DisturbanceFRCC-FBFM40 1321.01 TU1 0.03 Acres Operation DisturbanceFRCC-FBFM40 1321.02 GR1 0.03 Acres Construction DisturbanceFRCC-FBFM40 1321.02 GR1 0.01 Acres Operation DisturbanceFRCC-FBFM40 1321.02 GR2 0.00 Acres Construction DisturbanceFRCC-FBFM40 1321.02 GR2 0.00 Acres Operation DisturbanceFRCC-FBFM40 1321.02 GS1 4.27 Acres Construction DisturbanceFRCC-FBFM40 1321.02 GS1 0.42 Acres Operation DisturbanceFRCC-FBFM40 1321.02 GS2 11.18 Acres Construction DisturbanceFRCC-FBFM40 1321.02 GS2 1.12 Acres Operation DisturbanceFRCC-FBFM40 1321.02 SH1 0.00 Acres Construction DisturbanceFRCC-FBFM40 1321.02 SH1 0.00 Acres Operation DisturbanceFRCC-FBFM40 1321.02 SH5 0.64 Acres Construction DisturbanceFRCC-FBFM40 1321.02 SH5 0.05 Acres Operation DisturbanceFRCC-FBFM40 1321.02 TL3 0.00 Acres Construction DisturbanceFRCC-FBFM40 1321.02 TL3 0.00 Acres Operation DisturbanceFRCC-FBFM40 1322.01 GR1 0.10 Acres Construction DisturbanceFRCC-FBFM40 1322.01 GR1 0.01 Acres Operation DisturbanceFRCC-FBFM40 1322.01 GR2 0.03 Acres Construction DisturbanceFRCC-FBFM40 1322.01 GR2 0.00 Acres Operation DisturbanceFRCC-FBFM40 1322.01 GS1 5.78 Acres Construction DisturbanceFRCC-FBFM40 1322.01 GS1 0.69 Acres Operation DisturbanceFRCC-FBFM40 1322.01 GS2 13.50 Acres Construction DisturbanceFRCC-FBFM40 1322.01 GS2 2.07 Acres Operation DisturbanceFRCC-FBFM40 1322.01 NB1 0.00 Acres Construction DisturbanceFRCC-FBFM40 1322.01 NB1 0.00 Acres Operation DisturbanceFRCC-FBFM40 1322.01 SH1 0.03 Acres Construction DisturbanceFRCC-FBFM40 1322.01 SH1 0.00 Acres Operation DisturbanceFRCC-FBFM40 1322.01 SH5 0.74 Acres Construction DisturbanceFRCC-FBFM40 1322.01 SH5 0.26 Acres Operation DisturbanceFRCC-FBFM40 1322.01 TL3 0.00 Acres Construction DisturbanceFRCC-FBFM40 1322.01 TL3 0.00 Acres Operation DisturbanceFRCC-FBFM40 1322.02 GR1 0.39 Acres Construction DisturbanceFRCC-FBFM40 1322.02 GR1 0.08 Acres Operation DisturbanceFRCC-FBFM40 1322.02 GR2 0.13 Acres Construction DisturbanceFRCC-FBFM40 1322.02 GR2 0.03 Acres Operation DisturbanceFRCC-FBFM40 1322.02 GS1 19.06 Acres Construction DisturbanceFRCC-FBFM40 1322.02 GS1 4.00 Acres Operation DisturbanceFRCC-FBFM40 1322.02 GS2 36.28 Acres Construction DisturbanceFRCC-FBFM40 1322.02 GS2 7.63 Acres Operation DisturbanceFRCC-FBFM40 1322.02 NB1 0.29 Acres Construction DisturbanceFRCC-FBFM40 1322.02 NB1 0.06 Acres Operation Disturbance

Page 83: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

FRCC-FBFM40 1322.02 SH1 1.86 Acres Construction DisturbanceFRCC-FBFM40 1322.02 SH1 0.39 Acres Operation DisturbanceFRCC-FBFM40 1322.02 SH5 0.26 Acres Construction DisturbanceFRCC-FBFM40 1322.02 SH5 0.05 Acres Operation DisturbanceFRCC-FBFM40 1322.11 GR1 0.17 Acres Construction DisturbanceFRCC-FBFM40 1322.11 GR1 0.03 Acres Operation DisturbanceFRCC-FBFM40 1322.11 GR2 0.12 Acres Construction DisturbanceFRCC-FBFM40 1322.11 GR2 0.02 Acres Operation DisturbanceFRCC-FBFM40 1322.11 GS1 13.38 Acres Construction DisturbanceFRCC-FBFM40 1322.11 GS1 2.07 Acres Operation DisturbanceFRCC-FBFM40 1322.11 GS2 27.35 Acres Construction DisturbanceFRCC-FBFM40 1322.11 GS2 4.22 Acres Operation DisturbanceFRCC-FBFM40 1322.11 NB1 0.20 Acres Construction DisturbanceFRCC-FBFM40 1322.11 NB1 0.03 Acres Operation DisturbanceFRCC-FBFM40 1322.11 SH1 0.27 Acres Construction DisturbanceFRCC-FBFM40 1322.11 SH1 0.04 Acres Operation DisturbanceFRCC-FBFM40 1322.11 SH5 0.47 Acres Construction DisturbanceFRCC-FBFM40 1322.11 SH5 0.07 Acres Operation DisturbanceFRCC-FBFM40 1322.11 TU2 0.01 Acres Construction DisturbanceFRCC-FBFM40 1322.11 TU2 0.00 Acres Operation DisturbanceFRCC-FBFM40 1322.12 GR1 13.52 Acres Construction DisturbanceFRCC-FBFM40 1322.12 GR1 1.84 Acres Operation DisturbanceFRCC-FBFM40 1322.12 GR2 0.27 Acres Construction DisturbanceFRCC-FBFM40 1322.12 GR2 0.04 Acres Operation DisturbanceFRCC-FBFM40 1322.12 GS1 1.99 Acres Construction DisturbanceFRCC-FBFM40 1322.12 GS1 0.27 Acres Operation DisturbanceFRCC-FBFM40 1322.12 GS2 4.49 Acres Construction DisturbanceFRCC-FBFM40 1322.12 GS2 0.61 Acres Operation DisturbanceFRCC-FBFM40 1322.12 NB1 0.80 Acres Construction DisturbanceFRCC-FBFM40 1322.12 NB1 0.11 Acres Operation DisturbanceFRCC-FBFM40 1322.12 NB3 2.93 Acres Construction DisturbanceFRCC-FBFM40 1322.12 NB3 0.40 Acres Operation DisturbanceFRCC-FBFM40 1322.12 SH5 0.65 Acres Construction DisturbanceFRCC-FBFM40 1322.12 SH5 0.09 Acres Operation DisturbanceFRCC-FBFM40 1322.12 TL3 0.79 Acres Construction DisturbanceFRCC-FBFM40 1322.12 TL3 0.11 Acres Operation DisturbanceFRCC-FBFM40 1322.12 TL5 0.20 Acres Construction DisturbanceFRCC-FBFM40 1322.12 TL5 0.03 Acres Operation DisturbanceFRCC-FBFM40 1322.12 TL6 0.10 Acres Construction DisturbanceFRCC-FBFM40 1322.12 TL6 0.01 Acres Operation DisturbanceFRCC-FBFM40 1322.12 TL8 0.10 Acres Construction DisturbanceFRCC-FBFM40 1322.12 TL8 0.01 Acres Operation DisturbanceFRCC-FBFM40 1322.12 TU1 0.02 Acres Construction DisturbanceFRCC-FBFM40 1322.12 TU1 0.00 Acres Operation DisturbanceFRCC-FBFM40 1322.21 GR1 2.47 Acres Construction Disturbance

Page 84: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

FRCC-FBFM40 1322.21 GR1 0.61 Acres Operation DisturbanceFRCC-FBFM40 1322.21 GR2 0.10 Acres Construction DisturbanceFRCC-FBFM40 1322.21 GR2 0.02 Acres Operation DisturbanceFRCC-FBFM40 1322.21 GS1 4.38 Acres Construction DisturbanceFRCC-FBFM40 1322.21 GS1 1.08 Acres Operation DisturbanceFRCC-FBFM40 1322.21 GS2 12.92 Acres Construction DisturbanceFRCC-FBFM40 1322.21 GS2 3.18 Acres Operation DisturbanceFRCC-FBFM40 1322.21 NB1 0.74 Acres Construction DisturbanceFRCC-FBFM40 1322.21 NB1 0.18 Acres Operation DisturbanceFRCC-FBFM40 1322.21 NB3 0.01 Acres Construction DisturbanceFRCC-FBFM40 1322.21 NB3 0.00 Acres Operation DisturbanceFRCC-FBFM40 1322.21 SH1 0.04 Acres Construction DisturbanceFRCC-FBFM40 1322.21 SH1 0.01 Acres Operation DisturbanceFRCC-FBFM40 1322.21 SH5 0.86 Acres Construction DisturbanceFRCC-FBFM40 1322.21 SH5 0.21 Acres Operation DisturbanceFRCC-FBFM40 1322.21 SH7 0.02 Acres Construction DisturbanceFRCC-FBFM40 1322.21 SH7 0.00 Acres Operation DisturbanceFRCC-FBFM40 1322.21 TL3 1.68 Acres Construction DisturbanceFRCC-FBFM40 1322.21 TL3 0.41 Acres Operation DisturbanceFRCC-FBFM40 1322.21 TL5 0.22 Acres Construction DisturbanceFRCC-FBFM40 1322.21 TL5 0.05 Acres Operation DisturbanceFRCC-FBFM40 1322.21 TL6 0.02 Acres Construction DisturbanceFRCC-FBFM40 1322.21 TL6 0.01 Acres Operation DisturbanceFRCC-FBFM40 1322.21 TL8 0.00 Acres Construction DisturbanceFRCC-FBFM40 1322.21 TL8 0.00 Acres Operation DisturbanceFRCC-FBFM40 1322.21 TU1 0.03 Acres Construction DisturbanceFRCC-FBFM40 1322.21 TU1 0.01 Acres Operation DisturbanceFRCC-FBFM40 1322.22 GR1 19.93 Acres Construction DisturbanceFRCC-FBFM40 1322.22 GR1 2.70 Acres Operation DisturbanceFRCC-FBFM40 1322.22 GR2 0.37 Acres Construction DisturbanceFRCC-FBFM40 1322.22 GR2 0.05 Acres Operation DisturbanceFRCC-FBFM40 1322.22 GS1 7.64 Acres Construction DisturbanceFRCC-FBFM40 1322.22 GS1 1.03 Acres Operation DisturbanceFRCC-FBFM40 1322.22 GS2 17.84 Acres Construction DisturbanceFRCC-FBFM40 1322.22 GS2 2.42 Acres Operation DisturbanceFRCC-FBFM40 1322.22 NB1 2.84 Acres Construction DisturbanceFRCC-FBFM40 1322.22 NB1 0.39 Acres Operation DisturbanceFRCC-FBFM40 1322.22 NB3 3.72 Acres Construction DisturbanceFRCC-FBFM40 1322.22 NB3 0.50 Acres Operation DisturbanceFRCC-FBFM40 1322.22 NB8 0.07 Acres Construction DisturbanceFRCC-FBFM40 1322.22 NB8 0.01 Acres Operation DisturbanceFRCC-FBFM40 1322.22 NB9 0.05 Acres Construction DisturbanceFRCC-FBFM40 1322.22 NB9 0.01 Acres Operation DisturbanceFRCC-FBFM40 1322.22 SH1 0.05 Acres Construction DisturbanceFRCC-FBFM40 1322.22 SH1 0.01 Acres Operation Disturbance

Page 85: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

FRCC-FBFM40 1322.22 SH2 0.02 Acres Construction DisturbanceFRCC-FBFM40 1322.22 SH2 0.00 Acres Operation DisturbanceFRCC-FBFM40 1322.22 SH5 0.53 Acres Construction DisturbanceFRCC-FBFM40 1322.22 SH5 0.07 Acres Operation DisturbanceFRCC-FBFM40 1322.22 SH7 0.01 Acres Construction DisturbanceFRCC-FBFM40 1322.22 SH7 0.00 Acres Operation DisturbanceFRCC-FBFM40 1322.22 TL3 0.90 Acres Construction DisturbanceFRCC-FBFM40 1322.22 TL3 0.12 Acres Operation DisturbanceFRCC-FBFM40 1322.22 TL5 2.16 Acres Construction DisturbanceFRCC-FBFM40 1322.22 TL5 0.29 Acres Operation DisturbanceFRCC-FBFM40 1322.22 TL6 0.28 Acres Construction DisturbanceFRCC-FBFM40 1322.22 TL6 0.04 Acres Operation DisturbanceFRCC-FBFM40 1322.22 TL8 0.03 Acres Construction DisturbanceFRCC-FBFM40 1322.22 TL8 0.00 Acres Operation DisturbanceFRCC-FBFM40 1322.22 TU1 0.02 Acres Construction DisturbanceFRCC-FBFM40 1322.22 TU1 0.00 Acres Operation DisturbanceFRCC-FBFM40 1322.23 GR1 5.61 Acres Construction DisturbanceFRCC-FBFM40 1322.23 GR1 0.74 Acres Operation DisturbanceFRCC-FBFM40 1322.23 GR2 2.30 Acres Construction DisturbanceFRCC-FBFM40 1322.23 GR2 0.24 Acres Operation DisturbanceFRCC-FBFM40 1322.23 GS1 4.22 Acres Construction DisturbanceFRCC-FBFM40 1322.23 GS1 0.90 Acres Operation DisturbanceFRCC-FBFM40 1322.23 GS2 10.05 Acres Construction DisturbanceFRCC-FBFM40 1322.23 GS2 2.27 Acres Operation DisturbanceFRCC-FBFM40 1322.23 NB1 1.31 Acres Construction DisturbanceFRCC-FBFM40 1322.23 NB1 0.14 Acres Operation DisturbanceFRCC-FBFM40 1322.23 NB3 0.31 Acres Construction DisturbanceFRCC-FBFM40 1322.23 NB3 0.03 Acres Operation DisturbanceFRCC-FBFM40 1322.23 NB9 0.42 Acres Construction DisturbanceFRCC-FBFM40 1322.23 NB9 0.04 Acres Operation DisturbanceFRCC-FBFM40 1322.23 SH1 0.04 Acres Construction DisturbanceFRCC-FBFM40 1322.23 SH1 0.01 Acres Operation DisturbanceFRCC-FBFM40 1322.23 SH5 2.63 Acres Construction DisturbanceFRCC-FBFM40 1322.23 SH5 0.72 Acres Operation DisturbanceFRCC-FBFM40 1322.23 SH7 0.12 Acres Construction DisturbanceFRCC-FBFM40 1322.23 SH7 0.04 Acres Operation DisturbanceFRCC-FBFM40 1322.23 TL2 0.07 Acres Construction DisturbanceFRCC-FBFM40 1322.23 TL2 0.01 Acres Operation DisturbanceFRCC-FBFM40 1322.23 TL3 0.79 Acres Construction DisturbanceFRCC-FBFM40 1322.23 TL3 0.17 Acres Operation DisturbanceFRCC-FBFM40 1322.23 TL5 0.47 Acres Construction DisturbanceFRCC-FBFM40 1322.23 TL5 0.05 Acres Operation DisturbanceFRCC-FBFM40 1322.23 TL6 0.09 Acres Construction DisturbanceFRCC-FBFM40 1322.23 TL6 0.01 Acres Operation DisturbanceFRCC-FBFM40 1322.23 TL8 0.01 Acres Construction Disturbance

Page 86: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

FRCC-FBFM40 1322.23 TL8 0.00 Acres Operation DisturbanceFRCC-FBFM40 1322.23 TU1 0.11 Acres Construction DisturbanceFRCC-FBFM40 1322.23 TU1 0.03 Acres Operation DisturbanceFRCC-FBFM40 1322.23 TU5 0.19 Acres Construction DisturbanceFRCC-FBFM40 1322.23 TU5 0.06 Acres Operation DisturbanceFRCC-FBFM40 1322.51 GR1 0.38 Acres Construction DisturbanceFRCC-FBFM40 1322.51 GR1 0.06 Acres Operation DisturbanceFRCC-FBFM40 1322.51 GR2 0.02 Acres Construction DisturbanceFRCC-FBFM40 1322.51 GR2 0.00 Acres Operation DisturbanceFRCC-FBFM40 1322.51 GS1 18.21 Acres Construction DisturbanceFRCC-FBFM40 1322.51 GS1 2.99 Acres Operation DisturbanceFRCC-FBFM40 1322.51 GS2 49.79 Acres Construction DisturbanceFRCC-FBFM40 1322.51 GS2 8.16 Acres Operation DisturbanceFRCC-FBFM40 1322.51 NB1 2.57 Acres Construction DisturbanceFRCC-FBFM40 1322.51 NB1 0.42 Acres Operation DisturbanceFRCC-FBFM40 1322.51 SH1 0.29 Acres Construction DisturbanceFRCC-FBFM40 1322.51 SH1 0.05 Acres Operation DisturbanceFRCC-FBFM40 1322.51 SH5 1.78 Acres Construction DisturbanceFRCC-FBFM40 1322.51 SH5 0.29 Acres Operation DisturbanceFRCC-FBFM40 1322.51 TL3 0.89 Acres Construction DisturbanceFRCC-FBFM40 1322.51 TL3 0.15 Acres Operation DisturbanceFRCC-FBFM40 1322.52 GR1 0.03 Acres Construction DisturbanceFRCC-FBFM40 1322.52 GR1 0.01 Acres Operation DisturbanceFRCC-FBFM40 1322.52 GR2 0.00 Acres Construction DisturbanceFRCC-FBFM40 1322.52 GR2 0.00 Acres Operation DisturbanceFRCC-FBFM40 1322.52 GS1 1.28 Acres Construction DisturbanceFRCC-FBFM40 1322.52 GS1 0.27 Acres Operation DisturbanceFRCC-FBFM40 1322.52 GS2 9.56 Acres Construction DisturbanceFRCC-FBFM40 1322.52 GS2 2.01 Acres Operation DisturbanceFRCC-FBFM40 1322.52 SH5 0.26 Acres Construction DisturbanceFRCC-FBFM40 1322.52 SH5 0.06 Acres Operation DisturbanceFRCC-FBFM40 1322.53 GR1 3.68 Acres Construction DisturbanceFRCC-FBFM40 1322.53 GR1 0.98 Acres Operation DisturbanceFRCC-FBFM40 1322.53 GR2 0.17 Acres Construction DisturbanceFRCC-FBFM40 1322.53 GR2 0.05 Acres Operation DisturbanceFRCC-FBFM40 1322.53 GS1 4.30 Acres Construction DisturbanceFRCC-FBFM40 1322.53 GS1 1.14 Acres Operation DisturbanceFRCC-FBFM40 1322.53 GS2 16.15 Acres Construction DisturbanceFRCC-FBFM40 1322.53 GS2 4.30 Acres Operation DisturbanceFRCC-FBFM40 1322.53 NB1 0.00 Acres Construction DisturbanceFRCC-FBFM40 1322.53 NB1 0.00 Acres Operation DisturbanceFRCC-FBFM40 1322.53 NB3 0.17 Acres Construction DisturbanceFRCC-FBFM40 1322.53 NB3 0.05 Acres Operation DisturbanceFRCC-FBFM40 1322.53 NB9 0.05 Acres Construction DisturbanceFRCC-FBFM40 1322.53 NB9 0.01 Acres Operation Disturbance

Page 87: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

FRCC-FBFM40 1322.53 SH1 0.11 Acres Construction DisturbanceFRCC-FBFM40 1322.53 SH1 0.03 Acres Operation DisturbanceFRCC-FBFM40 1322.53 SH5 0.25 Acres Construction DisturbanceFRCC-FBFM40 1322.53 SH5 0.07 Acres Operation DisturbanceFRCC-FBFM40 1322.53 SH7 0.03 Acres Construction DisturbanceFRCC-FBFM40 1322.53 SH7 0.01 Acres Operation DisturbanceFRCC-FBFM40 1322.53 TL3 0.18 Acres Construction DisturbanceFRCC-FBFM40 1322.53 TL3 0.05 Acres Operation DisturbanceFRCC-FBFM40 1322.53 TL5 0.15 Acres Construction DisturbanceFRCC-FBFM40 1322.53 TL5 0.04 Acres Operation DisturbanceFRCC-FBFM40 1322.53 TL6 0.02 Acres Construction DisturbanceFRCC-FBFM40 1322.53 TL6 0.00 Acres Operation DisturbanceFRCC-FBFM40 1322.71 GR1 13.45 Acres Construction DisturbanceFRCC-FBFM40 1322.71 GR1 3.76 Acres Operation DisturbanceFRCC-FBFM40 1322.71 GR2 2.52 Acres Construction DisturbanceFRCC-FBFM40 1322.71 GR2 0.71 Acres Operation DisturbanceFRCC-FBFM40 1322.71 GS1 35.05 Acres Construction DisturbanceFRCC-FBFM40 1322.71 GS1 9.84 Acres Operation DisturbanceFRCC-FBFM40 1322.71 GS2 125.00 Acres Construction DisturbanceFRCC-FBFM40 1322.71 GS2 35.08 Acres Operation DisturbanceFRCC-FBFM40 1322.71 NB1 2.22 Acres Construction DisturbanceFRCC-FBFM40 1322.71 NB1 0.64 Acres Operation DisturbanceFRCC-FBFM40 1322.71 NB3 0.54 Acres Construction DisturbanceFRCC-FBFM40 1322.71 NB3 0.15 Acres Operation DisturbanceFRCC-FBFM40 1322.71 NB8 0.18 Acres Construction DisturbanceFRCC-FBFM40 1322.71 NB8 0.05 Acres Operation DisturbanceFRCC-FBFM40 1322.71 NB9 1.03 Acres Construction DisturbanceFRCC-FBFM40 1322.71 NB9 0.29 Acres Operation DisturbanceFRCC-FBFM40 1322.71 SH1 1.39 Acres Construction DisturbanceFRCC-FBFM40 1322.71 SH1 0.39 Acres Operation DisturbanceFRCC-FBFM40 1322.71 SH2 0.11 Acres Construction DisturbanceFRCC-FBFM40 1322.71 SH2 0.03 Acres Operation DisturbanceFRCC-FBFM40 1322.71 SH5 17.71 Acres Construction DisturbanceFRCC-FBFM40 1322.71 SH5 5.02 Acres Operation DisturbanceFRCC-FBFM40 1322.71 SH7 0.03 Acres Construction DisturbanceFRCC-FBFM40 1322.71 SH7 0.01 Acres Operation DisturbanceFRCC-FBFM40 1322.71 TL2 0.01 Acres Construction DisturbanceFRCC-FBFM40 1322.71 TL2 0.00 Acres Operation DisturbanceFRCC-FBFM40 1322.71 TL3 3.58 Acres Construction DisturbanceFRCC-FBFM40 1322.71 TL3 1.02 Acres Operation DisturbanceFRCC-FBFM40 1322.71 TL5 2.09 Acres Construction DisturbanceFRCC-FBFM40 1322.71 TL5 0.58 Acres Operation DisturbanceFRCC-FBFM40 1322.71 TL6 0.94 Acres Construction DisturbanceFRCC-FBFM40 1322.71 TL6 0.26 Acres Operation DisturbanceFRCC-FBFM40 1322.71 TL8 0.10 Acres Construction Disturbance

Page 88: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

FRCC-FBFM40 1322.71 TL8 0.03 Acres Operation DisturbanceFRCC-FBFM40 1322.71 TU1 0.03 Acres Construction DisturbanceFRCC-FBFM40 1322.71 TU1 0.01 Acres Operation DisturbanceFRCC-FBFM40 1322.71 TU5 0.01 Acres Construction DisturbanceFRCC-FBFM40 1322.71 TU5 0.00 Acres Operation DisturbanceFRCC-FBFM40 1323.01 GR1 24.01 Acres Construction DisturbanceFRCC-FBFM40 1323.01 GR1 6.16 Acres Operation DisturbanceFRCC-FBFM40 1323.01 GR2 1.56 Acres Construction DisturbanceFRCC-FBFM40 1323.01 GR2 0.42 Acres Operation DisturbanceFRCC-FBFM40 1323.01 GS1 14.55 Acres Construction DisturbanceFRCC-FBFM40 1323.01 GS1 3.73 Acres Operation DisturbanceFRCC-FBFM40 1323.01 GS2 38.82 Acres Construction DisturbanceFRCC-FBFM40 1323.01 GS2 10.12 Acres Operation DisturbanceFRCC-FBFM40 1323.01 NB1 2.63 Acres Construction DisturbanceFRCC-FBFM40 1323.01 NB1 0.69 Acres Operation DisturbanceFRCC-FBFM40 1323.01 NB3 3.30 Acres Construction DisturbanceFRCC-FBFM40 1323.01 NB3 0.81 Acres Operation DisturbanceFRCC-FBFM40 1323.01 NB8 0.02 Acres Construction DisturbanceFRCC-FBFM40 1323.01 NB8 0.00 Acres Operation DisturbanceFRCC-FBFM40 1323.01 NB9 2.41 Acres Construction DisturbanceFRCC-FBFM40 1323.01 NB9 0.62 Acres Operation DisturbanceFRCC-FBFM40 1323.01 SH1 0.46 Acres Construction DisturbanceFRCC-FBFM40 1323.01 SH1 0.12 Acres Operation DisturbanceFRCC-FBFM40 1323.01 SH2 0.01 Acres Construction DisturbanceFRCC-FBFM40 1323.01 SH2 0.00 Acres Operation DisturbanceFRCC-FBFM40 1323.01 SH5 1.29 Acres Construction DisturbanceFRCC-FBFM40 1323.01 SH5 0.35 Acres Operation DisturbanceFRCC-FBFM40 1323.01 SH7 0.05 Acres Construction DisturbanceFRCC-FBFM40 1323.01 SH7 0.01 Acres Operation DisturbanceFRCC-FBFM40 1323.01 TL2 0.01 Acres Construction DisturbanceFRCC-FBFM40 1323.01 TL2 0.00 Acres Operation DisturbanceFRCC-FBFM40 1323.01 TL3 1.37 Acres Construction DisturbanceFRCC-FBFM40 1323.01 TL3 0.35 Acres Operation DisturbanceFRCC-FBFM40 1323.01 TL5 2.22 Acres Construction DisturbanceFRCC-FBFM40 1323.01 TL5 0.60 Acres Operation DisturbanceFRCC-FBFM40 1323.01 TL6 0.52 Acres Construction DisturbanceFRCC-FBFM40 1323.01 TL6 0.16 Acres Operation DisturbanceFRCC-FBFM40 1323.01 TL8 0.11 Acres Construction DisturbanceFRCC-FBFM40 1323.01 TL8 0.03 Acres Operation DisturbanceFRCC-FBFM40 1323.01 TU1 0.13 Acres Construction DisturbanceFRCC-FBFM40 1323.01 TU1 0.04 Acres Operation DisturbanceFRCC-FBFM40 1323.01 TU5 0.30 Acres Construction DisturbanceFRCC-FBFM40 1323.01 TU5 0.07 Acres Operation DisturbanceFRCC-FBFM40 1323.02 GR1 4.40 Acres Construction DisturbanceFRCC-FBFM40 1323.02 GR1 1.64 Acres Operation Disturbance

Page 89: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

FRCC-FBFM40 1323.02 GR2 31.21 Acres Construction DisturbanceFRCC-FBFM40 1323.02 GR2 10.45 Acres Operation DisturbanceFRCC-FBFM40 1323.02 GS1 47.25 Acres Construction DisturbanceFRCC-FBFM40 1323.02 GS1 16.30 Acres Operation DisturbanceFRCC-FBFM40 1323.02 GS2 52.94 Acres Construction DisturbanceFRCC-FBFM40 1323.02 GS2 18.18 Acres Operation DisturbanceFRCC-FBFM40 1323.02 NB1 1.77 Acres Construction DisturbanceFRCC-FBFM40 1323.02 NB1 0.55 Acres Operation DisturbanceFRCC-FBFM40 1323.02 NB3 0.01 Acres Construction DisturbanceFRCC-FBFM40 1323.02 NB3 0.01 Acres Operation DisturbanceFRCC-FBFM40 1323.02 NB9 1.65 Acres Construction DisturbanceFRCC-FBFM40 1323.02 NB9 0.80 Acres Operation DisturbanceFRCC-FBFM40 1323.02 SH1 0.34 Acres Construction DisturbanceFRCC-FBFM40 1323.02 SH1 0.13 Acres Operation DisturbanceFRCC-FBFM40 1323.02 SH2 0.01 Acres Construction DisturbanceFRCC-FBFM40 1323.02 SH2 0.00 Acres Operation DisturbanceFRCC-FBFM40 1323.02 SH5 4.15 Acres Construction DisturbanceFRCC-FBFM40 1323.02 SH5 1.74 Acres Operation DisturbanceFRCC-FBFM40 1323.02 SH7 1.80 Acres Construction DisturbanceFRCC-FBFM40 1323.02 SH7 0.75 Acres Operation DisturbanceFRCC-FBFM40 1323.02 TL1 0.01 Acres Construction DisturbanceFRCC-FBFM40 1323.02 TL1 0.00 Acres Operation DisturbanceFRCC-FBFM40 1323.02 TL2 0.11 Acres Construction DisturbanceFRCC-FBFM40 1323.02 TL2 0.03 Acres Operation DisturbanceFRCC-FBFM40 1323.02 TL3 9.27 Acres Construction DisturbanceFRCC-FBFM40 1323.02 TL3 3.53 Acres Operation DisturbanceFRCC-FBFM40 1323.02 TL8 0.98 Acres Construction DisturbanceFRCC-FBFM40 1323.02 TL8 0.37 Acres Operation DisturbanceFRCC-FBFM40 1323.02 TU1 64.55 Acres Construction DisturbanceFRCC-FBFM40 1323.02 TU1 21.47 Acres Operation DisturbanceFRCC-FBFM40 1323.02 TU5 22.06 Acres Construction DisturbanceFRCC-FBFM40 1323.02 TU5 7.10 Acres Operation DisturbanceFRCC-FBFM40 1324 GR1 1.35 Acres Construction DisturbanceFRCC-FBFM40 1324 GR1 0.51 Acres Operation DisturbanceFRCC-FBFM40 1324 GR2 5.78 Acres Construction DisturbanceFRCC-FBFM40 1324 GR2 2.34 Acres Operation DisturbanceFRCC-FBFM40 1324 GS1 13.37 Acres Construction DisturbanceFRCC-FBFM40 1324 GS1 5.31 Acres Operation DisturbanceFRCC-FBFM40 1324 GS2 11.00 Acres Construction DisturbanceFRCC-FBFM40 1324 GS2 4.95 Acres Operation DisturbanceFRCC-FBFM40 1324 NB1 0.11 Acres Construction DisturbanceFRCC-FBFM40 1324 NB1 0.04 Acres Operation DisturbanceFRCC-FBFM40 1324 NB3 0.00 Acres Construction DisturbanceFRCC-FBFM40 1324 NB3 0.00 Acres Operation DisturbanceFRCC-FBFM40 1324 NB9 0.35 Acres Construction Disturbance

Page 90: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

FRCC-FBFM40 1324 NB9 0.15 Acres Operation DisturbanceFRCC-FBFM40 1324 SH5 0.01 Acres Construction DisturbanceFRCC-FBFM40 1324 SH5 0.01 Acres Operation DisturbanceFRCC-FBFM40 1324 SH7 0.12 Acres Construction DisturbanceFRCC-FBFM40 1324 SH7 0.06 Acres Operation DisturbanceFRCC-FBFM40 1324 TL2 0.02 Acres Construction DisturbanceFRCC-FBFM40 1324 TL2 0.01 Acres Operation DisturbanceFRCC-FBFM40 1324 TL3 0.79 Acres Construction DisturbanceFRCC-FBFM40 1324 TL3 0.32 Acres Operation DisturbanceFRCC-FBFM40 1324 TU1 39.89 Acres Construction DisturbanceFRCC-FBFM40 1324 TU1 16.28 Acres Operation DisturbanceFRCC-FBFM40 1324 TU5 7.79 Acres Construction DisturbanceFRCC-FBFM40 1324 TU5 2.92 Acres Operation DisturbanceFRCC-FBFM40 1325 GR1 7.50 Acres Construction DisturbanceFRCC-FBFM40 1325 GR1 3.29 Acres Operation DisturbanceFRCC-FBFM40 1325 GR2 1.16 Acres Construction DisturbanceFRCC-FBFM40 1325 GR2 0.46 Acres Operation DisturbanceFRCC-FBFM40 1325 GS1 29.89 Acres Construction DisturbanceFRCC-FBFM40 1325 GS1 12.83 Acres Operation DisturbanceFRCC-FBFM40 1325 GS2 46.61 Acres Construction DisturbanceFRCC-FBFM40 1325 GS2 18.96 Acres Operation DisturbanceFRCC-FBFM40 1325 NB1 0.51 Acres Construction DisturbanceFRCC-FBFM40 1325 NB1 0.19 Acres Operation DisturbanceFRCC-FBFM40 1325 NB3 0.06 Acres Construction DisturbanceFRCC-FBFM40 1325 NB3 0.03 Acres Operation DisturbanceFRCC-FBFM40 1325 NB9 0.48 Acres Construction DisturbanceFRCC-FBFM40 1325 NB9 0.21 Acres Operation DisturbanceFRCC-FBFM40 1325 SH1 0.08 Acres Construction DisturbanceFRCC-FBFM40 1325 SH1 0.03 Acres Operation DisturbanceFRCC-FBFM40 1325 SH2 0.04 Acres Construction DisturbanceFRCC-FBFM40 1325 SH2 0.02 Acres Operation DisturbanceFRCC-FBFM40 1325 SH5 14.23 Acres Construction DisturbanceFRCC-FBFM40 1325 SH5 5.76 Acres Operation DisturbanceFRCC-FBFM40 1325 SH7 18.81 Acres Construction DisturbanceFRCC-FBFM40 1325 SH7 7.32 Acres Operation DisturbanceFRCC-FBFM40 1325 TL1 0.10 Acres Construction DisturbanceFRCC-FBFM40 1325 TL1 0.04 Acres Operation DisturbanceFRCC-FBFM40 1325 TL3 3.89 Acres Construction DisturbanceFRCC-FBFM40 1325 TL3 1.52 Acres Operation DisturbanceFRCC-FBFM40 1325 TU1 29.12 Acres Construction DisturbanceFRCC-FBFM40 1325 TU1 11.25 Acres Operation DisturbanceFRCC-FBFM40 1325 TU5 6.27 Acres Construction DisturbanceFRCC-FBFM40 1325 TU5 2.42 Acres Operation DisturbanceFRCC-FBFM40 1350 GR1 12.20 Acres Construction DisturbanceFRCC-FBFM40 1350 GR1 4.39 Acres Operation Disturbance

Page 91: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

FRCC-FBFM40 1350 GR2 32.60 Acres Construction DisturbanceFRCC-FBFM40 1350 GR2 12.11 Acres Operation DisturbanceFRCC-FBFM40 1350 GR4 0.03 Acres Construction DisturbanceFRCC-FBFM40 1350 GR4 0.02 Acres Operation DisturbanceFRCC-FBFM40 1350 GS1 14.07 Acres Construction DisturbanceFRCC-FBFM40 1350 GS1 4.87 Acres Operation DisturbanceFRCC-FBFM40 1350 GS2 111.65 Acres Construction DisturbanceFRCC-FBFM40 1350 GS2 38.27 Acres Operation DisturbanceFRCC-FBFM40 1350 NB1 5.40 Acres Construction DisturbanceFRCC-FBFM40 1350 NB1 2.40 Acres Operation DisturbanceFRCC-FBFM40 1350 NB3 9.59 Acres Construction DisturbanceFRCC-FBFM40 1350 NB3 4.70 Acres Operation DisturbanceFRCC-FBFM40 1350 NB9 1.22 Acres Construction DisturbanceFRCC-FBFM40 1350 NB9 0.45 Acres Operation DisturbanceFRCC-FBFM40 1350 SH1 6.91 Acres Construction DisturbanceFRCC-FBFM40 1350 SH1 2.66 Acres Operation DisturbanceFRCC-FBFM40 1350 SH2 13.19 Acres Construction DisturbanceFRCC-FBFM40 1350 SH2 4.11 Acres Operation DisturbanceFRCC-FBFM40 1350 SH5 28.45 Acres Construction DisturbanceFRCC-FBFM40 1350 SH5 10.25 Acres Operation DisturbanceFRCC-FBFM40 1350 SH7 5.04 Acres Construction DisturbanceFRCC-FBFM40 1350 SH7 1.87 Acres Operation DisturbanceFRCC-FBFM40 1350 TL1 0.04 Acres Construction DisturbanceFRCC-FBFM40 1350 TL1 0.02 Acres Operation DisturbanceFRCC-FBFM40 1350 TL2 0.02 Acres Construction DisturbanceFRCC-FBFM40 1350 TL2 0.01 Acres Operation DisturbanceFRCC-FBFM40 1350 TL3 3.76 Acres Construction DisturbanceFRCC-FBFM40 1350 TL3 1.39 Acres Operation DisturbanceFRCC-FBFM40 1350 TU5 0.01 Acres Construction DisturbanceFRCC-FBFM40 1350 TU5 0.01 Acres Operation DisturbanceFRCC-FBFM40 1360 GR1 47.89 Acres Construction DisturbanceFRCC-FBFM40 1360 GR1 13.17 Acres Operation DisturbanceFRCC-FBFM40 1360 GR2 94.35 Acres Construction DisturbanceFRCC-FBFM40 1360 GR2 23.75 Acres Operation DisturbanceFRCC-FBFM40 1360 GS1 26.92 Acres Construction DisturbanceFRCC-FBFM40 1360 GS1 6.23 Acres Operation DisturbanceFRCC-FBFM40 1360 GS2 40.77 Acres Construction DisturbanceFRCC-FBFM40 1360 GS2 8.71 Acres Operation DisturbanceFRCC-FBFM40 1360 NB1 5.35 Acres Construction DisturbanceFRCC-FBFM40 1360 NB1 1.16 Acres Operation DisturbanceFRCC-FBFM40 1360 NB3 7.19 Acres Construction DisturbanceFRCC-FBFM40 1360 NB3 1.50 Acres Operation DisturbanceFRCC-FBFM40 1360 NB8 0.00 Acres Construction DisturbanceFRCC-FBFM40 1360 NB8 0.00 Acres Operation DisturbanceFRCC-FBFM40 1360 NB9 0.08 Acres Construction Disturbance

Page 92: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

FRCC-FBFM40 1360 NB9 0.02 Acres Operation DisturbanceFRCC-FBFM40 1360 SH1 32.92 Acres Construction DisturbanceFRCC-FBFM40 1360 SH1 7.16 Acres Operation DisturbanceFRCC-FBFM40 1360 SH2 122.72 Acres Construction DisturbanceFRCC-FBFM40 1360 SH2 25.26 Acres Operation DisturbanceFRCC-FBFM40 1360 SH5 0.50 Acres Construction DisturbanceFRCC-FBFM40 1360 SH5 0.12 Acres Operation DisturbanceFRCC-FBFM40 1360 TL3 0.26 Acres Construction DisturbanceFRCC-FBFM40 1360 TL3 0.06 Acres Operation DisturbanceFRCC-FBFM40 1430 GR1 144.95 Acres Construction DisturbanceFRCC-FBFM40 1430 GR1 29.10 Acres Operation DisturbanceFRCC-FBFM40 1430 GR2 6.59 Acres Construction DisturbanceFRCC-FBFM40 1430 GR2 1.32 Acres Operation DisturbanceFRCC-FBFM40 1430 GS1 10.99 Acres Construction DisturbanceFRCC-FBFM40 1430 GS1 2.20 Acres Operation DisturbanceFRCC-FBFM40 1430 GS2 0.01 Acres Construction DisturbanceFRCC-FBFM40 1430 GS2 0.00 Acres Operation DisturbanceFRCC-FBFM40 1430 NB1 0.96 Acres Construction DisturbanceFRCC-FBFM40 1430 NB1 0.19 Acres Operation DisturbanceFRCC-FBFM40 1430 NB8 0.30 Acres Construction DisturbanceFRCC-FBFM40 1430 NB8 0.06 Acres Operation DisturbanceFRCC-FBFM40 1430 NB9 14.99 Acres Construction DisturbanceFRCC-FBFM40 1430 NB9 3.01 Acres Operation DisturbanceFRCC-FBFM40 1430 SH1 42.24 Acres Construction DisturbanceFRCC-FBFM40 1430 SH1 8.48 Acres Operation DisturbanceFRCC-FBFM40 1430 SH2 1.10 Acres Construction DisturbanceFRCC-FBFM40 1430 SH2 0.22 Acres Operation DisturbanceFRCC-FBFM40 1430 SH5 0.00 Acres Construction DisturbanceFRCC-FBFM40 1430 SH5 0.00 Acres Operation DisturbanceFRCC-FRG 1210 Barren 0.13 Acres Construction DisturbanceFRCC-FRG 1210 Barren 0.06 Acres Operation DisturbanceFRCC-FRG 1210 Fire Regime Group I 0.87 Acres Construction DisturbanceFRCC-FRG 1210 Fire Regime Group I 0.22 Acres Operation DisturbanceFRCC-FRG 1210 Fire Regime Group III 17.32 Acres Construction DisturbanceFRCC-FRG 1210 Fire Regime Group III 3.92 Acres Operation DisturbanceFRCC-FRG 1210 Fire Regime Group IV 238.90 Acres Construction DisturbanceFRCC-FRG 1210 Fire Regime Group IV 46.11 Acres Operation DisturbanceFRCC-FRG 1210 Fire Regime Group V 54.23 Acres Construction DisturbanceFRCC-FRG 1210 Fire Regime Group V 10.96 Acres Operation DisturbanceFRCC-FRG 1210 Indeterminate Fire Regime Characteristics 0.78 Acres Construction DisturbanceFRCC-FRG 1210 Indeterminate Fire Regime Characteristics 0.36 Acres Operation DisturbanceFRCC-FRG 1210 Sparsely Vegetated 0.02 Acres Construction DisturbanceFRCC-FRG 1210 Sparsely Vegetated 0.01 Acres Operation DisturbanceFRCC-FRG 1210 Water 0.01 Acres Construction DisturbanceFRCC-FRG 1210 Water 0.00 Acres Operation Disturbance

Page 93: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

FRCC-FRG 1211 Barren 0.65 Acres Construction DisturbanceFRCC-FRG 1211 Barren 0.16 Acres Operation DisturbanceFRCC-FRG 1211 Fire Regime Group III 13.14 Acres Construction DisturbanceFRCC-FRG 1211 Fire Regime Group III 3.07 Acres Operation DisturbanceFRCC-FRG 1211 Fire Regime Group IV 65.43 Acres Construction DisturbanceFRCC-FRG 1211 Fire Regime Group IV 15.28 Acres Operation DisturbanceFRCC-FRG 1211 Fire Regime Group V 19.90 Acres Construction DisturbanceFRCC-FRG 1211 Fire Regime Group V 4.54 Acres Operation DisturbanceFRCC-FRG 1211 Indeterminate Fire Regime Characteristics 3.59 Acres Construction DisturbanceFRCC-FRG 1211 Indeterminate Fire Regime Characteristics 0.81 Acres Operation DisturbanceFRCC-FRG 1211 Sparsely Vegetated 0.23 Acres Construction DisturbanceFRCC-FRG 1211 Sparsely Vegetated 0.05 Acres Operation DisturbanceFRCC-FRG 1212 Barren 21.59 Acres Construction DisturbanceFRCC-FRG 1212 Barren 9.16 Acres Operation DisturbanceFRCC-FRG 1212 Fire Regime Group I 0.09 Acres Construction DisturbanceFRCC-FRG 1212 Fire Regime Group I 0.06 Acres Operation DisturbanceFRCC-FRG 1212 Fire Regime Group III 5.38 Acres Construction DisturbanceFRCC-FRG 1212 Fire Regime Group III 2.23 Acres Operation DisturbanceFRCC-FRG 1212 Fire Regime Group IV 37.07 Acres Construction DisturbanceFRCC-FRG 1212 Fire Regime Group IV 16.42 Acres Operation DisturbanceFRCC-FRG 1212 Fire Regime Group V 135.96 Acres Construction DisturbanceFRCC-FRG 1212 Fire Regime Group V 54.99 Acres Operation DisturbanceFRCC-FRG 1212 Indeterminate Fire Regime Characteristics 26.02 Acres Construction DisturbanceFRCC-FRG 1212 Indeterminate Fire Regime Characteristics 9.57 Acres Operation DisturbanceFRCC-FRG 1212 Sparsely Vegetated 0.97 Acres Construction DisturbanceFRCC-FRG 1212 Sparsely Vegetated 0.44 Acres Operation DisturbanceFRCC-FRG 1214 Barren 2.48 Acres Construction DisturbanceFRCC-FRG 1214 Barren 0.53 Acres Operation DisturbanceFRCC-FRG 1214 Fire Regime Group III 12.04 Acres Construction DisturbanceFRCC-FRG 1214 Fire Regime Group III 2.65 Acres Operation DisturbanceFRCC-FRG 1214 Fire Regime Group IV 115.36 Acres Construction DisturbanceFRCC-FRG 1214 Fire Regime Group IV 26.85 Acres Operation DisturbanceFRCC-FRG 1214 Fire Regime Group V 14.79 Acres Construction DisturbanceFRCC-FRG 1214 Fire Regime Group V 3.32 Acres Operation DisturbanceFRCC-FRG 1214 Indeterminate Fire Regime Characteristics 0.50 Acres Construction DisturbanceFRCC-FRG 1214 Indeterminate Fire Regime Characteristics 0.20 Acres Operation DisturbanceFRCC-FRG 1214 Sparsely Vegetated 0.20 Acres Construction DisturbanceFRCC-FRG 1214 Sparsely Vegetated 0.04 Acres Operation DisturbanceFRCC-FRG 1215 Barren 0.39 Acres Construction DisturbanceFRCC-FRG 1215 Barren 0.09 Acres Operation DisturbanceFRCC-FRG 1215 Fire Regime Group III 2.73 Acres Construction DisturbanceFRCC-FRG 1215 Fire Regime Group III 0.60 Acres Operation DisturbanceFRCC-FRG 1215 Fire Regime Group IV 12.52 Acres Construction DisturbanceFRCC-FRG 1215 Fire Regime Group IV 2.93 Acres Operation DisturbanceFRCC-FRG 1215 Fire Regime Group V 76.61 Acres Construction Disturbance

Page 94: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

FRCC-FRG 1215 Fire Regime Group V 16.71 Acres Operation DisturbanceFRCC-FRG 1215 Indeterminate Fire Regime Characteristics 0.22 Acres Construction DisturbanceFRCC-FRG 1215 Indeterminate Fire Regime Characteristics 0.05 Acres Operation DisturbanceFRCC-FRG 1215 Sparsely Vegetated 0.01 Acres Construction DisturbanceFRCC-FRG 1215 Sparsely Vegetated 0.00 Acres Operation DisturbanceFRCC-FRG 1215.05 Barren 24.59 Acres Construction DisturbanceFRCC-FRG 1215.05 Barren 7.03 Acres Operation DisturbanceFRCC-FRG 1215.05 Fire Regime Group I 0.05 Acres Construction DisturbanceFRCC-FRG 1215.05 Fire Regime Group I 0.03 Acres Operation DisturbanceFRCC-FRG 1215.05 Fire Regime Group III 3.18 Acres Construction DisturbanceFRCC-FRG 1215.05 Fire Regime Group III 1.04 Acres Operation DisturbanceFRCC-FRG 1215.05 Fire Regime Group IV 16.87 Acres Construction DisturbanceFRCC-FRG 1215.05 Fire Regime Group IV 4.27 Acres Operation DisturbanceFRCC-FRG 1215.05 Fire Regime Group V 93.81 Acres Construction DisturbanceFRCC-FRG 1215.05 Fire Regime Group V 29.83 Acres Operation DisturbanceFRCC-FRG 1215.05 Indeterminate Fire Regime Characteristics 1.65 Acres Construction DisturbanceFRCC-FRG 1215.05 Indeterminate Fire Regime Characteristics 0.57 Acres Operation DisturbanceFRCC-FRG 1215.05 Sparsely Vegetated 0.55 Acres Construction DisturbanceFRCC-FRG 1215.05 Sparsely Vegetated 0.17 Acres Operation DisturbanceFRCC-FRG 1320.05 Barren 10.83 Acres Construction DisturbanceFRCC-FRG 1320.05 Barren 2.20 Acres Operation DisturbanceFRCC-FRG 1320.05 Fire Regime Group I 56.63 Acres Construction DisturbanceFRCC-FRG 1320.05 Fire Regime Group I 11.17 Acres Operation DisturbanceFRCC-FRG 1320.05 Fire Regime Group III 29.49 Acres Construction DisturbanceFRCC-FRG 1320.05 Fire Regime Group III 5.04 Acres Operation DisturbanceFRCC-FRG 1320.05 Fire Regime Group IV 150.25 Acres Construction DisturbanceFRCC-FRG 1320.05 Fire Regime Group IV 23.47 Acres Operation DisturbanceFRCC-FRG 1320.05 Fire Regime Group V 235.04 Acres Construction DisturbanceFRCC-FRG 1320.05 Fire Regime Group V 38.81 Acres Operation DisturbanceFRCC-FRG 1320.05 Indeterminate Fire Regime Characteristics 9.79 Acres Construction DisturbanceFRCC-FRG 1320.05 Indeterminate Fire Regime Characteristics 1.65 Acres Operation DisturbanceFRCC-FRG 1320.05 Sparsely Vegetated 2.28 Acres Construction DisturbanceFRCC-FRG 1320.05 Sparsely Vegetated 0.48 Acres Operation DisturbanceFRCC-FRG 1320.05 Water 5.24 Acres Construction DisturbanceFRCC-FRG 1320.05 Water 1.04 Acres Operation DisturbanceFRCC-FRG 1320.15 Barren 0.09 Acres Construction DisturbanceFRCC-FRG 1320.15 Barren 0.03 Acres Operation DisturbanceFRCC-FRG 1320.15 Fire Regime Group I 7.94 Acres Construction DisturbanceFRCC-FRG 1320.15 Fire Regime Group I 3.13 Acres Operation DisturbanceFRCC-FRG 1320.15 Fire Regime Group III 323.00 Acres Construction DisturbanceFRCC-FRG 1320.15 Fire Regime Group III 126.79 Acres Operation DisturbanceFRCC-FRG 1320.15 Fire Regime Group IV 165.58 Acres Construction DisturbanceFRCC-FRG 1320.15 Fire Regime Group IV 65.55 Acres Operation DisturbanceFRCC-FRG 1320.15 Fire Regime Group V 5.07 Acres Construction DisturbanceFRCC-FRG 1320.15 Fire Regime Group V 2.56 Acres Operation Disturbance

Page 95: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

FRCC-FRG 1320.15 Sparsely Vegetated 0.09 Acres Construction DisturbanceFRCC-FRG 1320.15 Sparsely Vegetated 0.05 Acres Operation DisturbanceFRCC-FRG 1320.15 Water 0.01 Acres Construction DisturbanceFRCC-FRG 1320.15 Water 0.00 Acres Operation DisturbanceFRCC-FRG 1320.2 Fire Regime Group I 0.17 Acres Construction DisturbanceFRCC-FRG 1320.2 Fire Regime Group I 0.08 Acres Operation DisturbanceFRCC-FRG 1320.2 Fire Regime Group III 84.92 Acres Construction DisturbanceFRCC-FRG 1320.2 Fire Regime Group III 31.23 Acres Operation DisturbanceFRCC-FRG 1320.2 Fire Regime Group IV 34.76 Acres Construction DisturbanceFRCC-FRG 1320.2 Fire Regime Group IV 14.34 Acres Operation DisturbanceFRCC-FRG 1320.2 Fire Regime Group V 0.04 Acres Construction DisturbanceFRCC-FRG 1320.2 Fire Regime Group V 0.02 Acres Operation DisturbanceFRCC-FRG 1320.2 Indeterminate Fire Regime Characteristics 0.36 Acres Construction DisturbanceFRCC-FRG 1320.2 Indeterminate Fire Regime Characteristics 0.09 Acres Operation DisturbanceFRCC-FRG 1320.2 Sparsely Vegetated 0.01 Acres Construction DisturbanceFRCC-FRG 1320.2 Sparsely Vegetated 0.00 Acres Operation DisturbanceFRCC-FRG 1320.21 Fire Regime Group III 3.52 Acres Construction DisturbanceFRCC-FRG 1320.21 Fire Regime Group III 1.45 Acres Operation DisturbanceFRCC-FRG 1320.21 Fire Regime Group IV 2.09 Acres Construction DisturbanceFRCC-FRG 1320.21 Fire Regime Group IV 0.71 Acres Operation DisturbanceFRCC-FRG 1321.01 Barren 2.68 Acres Construction DisturbanceFRCC-FRG 1321.01 Barren 0.65 Acres Operation DisturbanceFRCC-FRG 1321.01 Fire Regime Group I 4.37 Acres Construction DisturbanceFRCC-FRG 1321.01 Fire Regime Group I 0.69 Acres Operation DisturbanceFRCC-FRG 1321.01 Fire Regime Group III 78.32 Acres Construction DisturbanceFRCC-FRG 1321.01 Fire Regime Group III 15.89 Acres Operation DisturbanceFRCC-FRG 1321.01 Fire Regime Group IV 265.29 Acres Construction DisturbanceFRCC-FRG 1321.01 Fire Regime Group IV 45.05 Acres Operation DisturbanceFRCC-FRG 1321.01 Fire Regime Group V 50.78 Acres Construction DisturbanceFRCC-FRG 1321.01 Fire Regime Group V 10.30 Acres Operation DisturbanceFRCC-FRG 1321.01 Indeterminate Fire Regime Characteristics 5.11 Acres Construction DisturbanceFRCC-FRG 1321.01 Indeterminate Fire Regime Characteristics 0.81 Acres Operation DisturbanceFRCC-FRG 1321.01 Sparsely Vegetated 0.47 Acres Construction DisturbanceFRCC-FRG 1321.01 Sparsely Vegetated 0.17 Acres Operation DisturbanceFRCC-FRG 1321.01 Water 0.37 Acres Construction DisturbanceFRCC-FRG 1321.01 Water 0.16 Acres Operation DisturbanceFRCC-FRG 1321.02 Fire Regime Group I 0.08 Acres Construction DisturbanceFRCC-FRG 1321.02 Fire Regime Group I 0.02 Acres Operation DisturbanceFRCC-FRG 1321.02 Fire Regime Group III 0.93 Acres Construction DisturbanceFRCC-FRG 1321.02 Fire Regime Group III 0.27 Acres Operation DisturbanceFRCC-FRG 1321.02 Fire Regime Group IV 15.05 Acres Construction DisturbanceFRCC-FRG 1321.02 Fire Regime Group IV 1.30 Acres Operation DisturbanceFRCC-FRG 1321.02 Fire Regime Group V 0.07 Acres Construction DisturbanceFRCC-FRG 1321.02 Fire Regime Group V 0.02 Acres Operation DisturbanceFRCC-FRG 1322.01 Fire Regime Group I 0.04 Acres Construction Disturbance

Page 96: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

FRCC-FRG 1322.01 Fire Regime Group I 0.01 Acres Operation DisturbanceFRCC-FRG 1322.01 Fire Regime Group III 2.09 Acres Construction DisturbanceFRCC-FRG 1322.01 Fire Regime Group III 0.55 Acres Operation DisturbanceFRCC-FRG 1322.01 Fire Regime Group IV 17.87 Acres Construction DisturbanceFRCC-FRG 1322.01 Fire Regime Group IV 2.45 Acres Operation DisturbanceFRCC-FRG 1322.01 Fire Regime Group V 0.18 Acres Construction DisturbanceFRCC-FRG 1322.01 Fire Regime Group V 0.02 Acres Operation DisturbanceFRCC-FRG 1322.01 Indeterminate Fire Regime Characteristics 0.00 Acres Construction DisturbanceFRCC-FRG 1322.01 Indeterminate Fire Regime Characteristics 0.00 Acres Operation DisturbanceFRCC-FRG 1322.02 Fire Regime Group I 0.04 Acres Construction DisturbanceFRCC-FRG 1322.02 Fire Regime Group I 0.01 Acres Operation DisturbanceFRCC-FRG 1322.02 Fire Regime Group III 2.51 Acres Construction DisturbanceFRCC-FRG 1322.02 Fire Regime Group III 0.53 Acres Operation DisturbanceFRCC-FRG 1322.02 Fire Regime Group IV 54.45 Acres Construction DisturbanceFRCC-FRG 1322.02 Fire Regime Group IV 11.44 Acres Operation DisturbanceFRCC-FRG 1322.02 Fire Regime Group V 1.25 Acres Construction DisturbanceFRCC-FRG 1322.02 Fire Regime Group V 0.26 Acres Operation DisturbanceFRCC-FRG 1322.02 Indeterminate Fire Regime Characteristics 0.02 Acres Construction DisturbanceFRCC-FRG 1322.02 Indeterminate Fire Regime Characteristics 0.00 Acres Operation DisturbanceFRCC-FRG 1322.11 Fire Regime Group I 0.11 Acres Construction DisturbanceFRCC-FRG 1322.11 Fire Regime Group I 0.02 Acres Operation DisturbanceFRCC-FRG 1322.11 Fire Regime Group III 0.92 Acres Construction DisturbanceFRCC-FRG 1322.11 Fire Regime Group III 0.14 Acres Operation DisturbanceFRCC-FRG 1322.11 Fire Regime Group IV 40.69 Acres Construction DisturbanceFRCC-FRG 1322.11 Fire Regime Group IV 6.29 Acres Operation DisturbanceFRCC-FRG 1322.11 Fire Regime Group V 0.24 Acres Construction DisturbanceFRCC-FRG 1322.11 Fire Regime Group V 0.04 Acres Operation DisturbanceFRCC-FRG 1322.11 Indeterminate Fire Regime Characteristics 0.01 Acres Construction DisturbanceFRCC-FRG 1322.11 Indeterminate Fire Regime Characteristics 0.00 Acres Operation DisturbanceFRCC-FRG 1322.12 Fire Regime Group I 0.07 Acres Construction DisturbanceFRCC-FRG 1322.12 Fire Regime Group I 0.01 Acres Operation DisturbanceFRCC-FRG 1322.12 Fire Regime Group III 8.62 Acres Construction DisturbanceFRCC-FRG 1322.12 Fire Regime Group III 1.17 Acres Operation DisturbanceFRCC-FRG 1322.12 Fire Regime Group IV 16.69 Acres Construction DisturbanceFRCC-FRG 1322.12 Fire Regime Group IV 2.27 Acres Operation DisturbanceFRCC-FRG 1322.12 Fire Regime Group V 0.47 Acres Construction DisturbanceFRCC-FRG 1322.12 Fire Regime Group V 0.06 Acres Operation DisturbanceFRCC-FRG 1322.21 Fire Regime Group I 0.12 Acres Construction DisturbanceFRCC-FRG 1322.21 Fire Regime Group I 0.03 Acres Operation DisturbanceFRCC-FRG 1322.21 Fire Regime Group III 10.11 Acres Construction DisturbanceFRCC-FRG 1322.21 Fire Regime Group III 2.49 Acres Operation DisturbanceFRCC-FRG 1322.21 Fire Regime Group IV 12.98 Acres Construction DisturbanceFRCC-FRG 1322.21 Fire Regime Group IV 3.19 Acres Operation DisturbanceFRCC-FRG 1322.21 Fire Regime Group V 0.27 Acres Construction DisturbanceFRCC-FRG 1322.21 Fire Regime Group V 0.07 Acres Operation Disturbance

Page 97: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

FRCC-FRG 1322.21 Sparsely Vegetated 0.00 Acres Construction DisturbanceFRCC-FRG 1322.21 Sparsely Vegetated 0.00 Acres Operation DisturbanceFRCC-FRG 1322.22 Barren 0.05 Acres Construction DisturbanceFRCC-FRG 1322.22 Barren 0.01 Acres Operation DisturbanceFRCC-FRG 1322.22 Fire Regime Group I 0.02 Acres Construction DisturbanceFRCC-FRG 1322.22 Fire Regime Group I 0.00 Acres Operation DisturbanceFRCC-FRG 1322.22 Fire Regime Group III 5.82 Acres Construction DisturbanceFRCC-FRG 1322.22 Fire Regime Group III 0.79 Acres Operation DisturbanceFRCC-FRG 1322.22 Fire Regime Group IV 48.60 Acres Construction DisturbanceFRCC-FRG 1322.22 Fire Regime Group IV 6.58 Acres Operation DisturbanceFRCC-FRG 1322.22 Fire Regime Group V 1.89 Acres Construction DisturbanceFRCC-FRG 1322.22 Fire Regime Group V 0.26 Acres Operation DisturbanceFRCC-FRG 1322.22 Indeterminate Fire Regime Characteristics 0.01 Acres Construction DisturbanceFRCC-FRG 1322.22 Indeterminate Fire Regime Characteristics 0.00 Acres Operation DisturbanceFRCC-FRG 1322.22 Sparsely Vegetated 0.07 Acres Construction DisturbanceFRCC-FRG 1322.22 Sparsely Vegetated 0.01 Acres Operation DisturbanceFRCC-FRG 1322.23 Barren 0.01 Acres Construction DisturbanceFRCC-FRG 1322.23 Barren 0.00 Acres Operation DisturbanceFRCC-FRG 1322.23 Fire Regime Group I 4.05 Acres Construction DisturbanceFRCC-FRG 1322.23 Fire Regime Group I 0.61 Acres Operation DisturbanceFRCC-FRG 1322.23 Fire Regime Group III 16.34 Acres Construction DisturbanceFRCC-FRG 1322.23 Fire Regime Group III 3.16 Acres Operation DisturbanceFRCC-FRG 1322.23 Fire Regime Group IV 8.20 Acres Construction DisturbanceFRCC-FRG 1322.23 Fire Regime Group IV 1.66 Acres Operation DisturbanceFRCC-FRG 1322.23 Fire Regime Group V 0.11 Acres Construction DisturbanceFRCC-FRG 1322.23 Fire Regime Group V 0.01 Acres Operation DisturbanceFRCC-FRG 1322.23 Sparsely Vegetated 0.02 Acres Construction DisturbanceFRCC-FRG 1322.23 Sparsely Vegetated 0.00 Acres Operation DisturbanceFRCC-FRG 1322.51 Fire Regime Group I 0.01 Acres Construction DisturbanceFRCC-FRG 1322.51 Fire Regime Group I 0.00 Acres Operation DisturbanceFRCC-FRG 1322.51 Fire Regime Group III 7.21 Acres Construction DisturbanceFRCC-FRG 1322.51 Fire Regime Group III 1.18 Acres Operation DisturbanceFRCC-FRG 1322.51 Fire Regime Group IV 66.04 Acres Construction DisturbanceFRCC-FRG 1322.51 Fire Regime Group IV 10.83 Acres Operation DisturbanceFRCC-FRG 1322.51 Fire Regime Group V 0.67 Acres Construction DisturbanceFRCC-FRG 1322.51 Fire Regime Group V 0.11 Acres Operation DisturbanceFRCC-FRG 1322.51 Indeterminate Fire Regime Characteristics 0.00 Acres Construction DisturbanceFRCC-FRG 1322.51 Indeterminate Fire Regime Characteristics 0.00 Acres Operation DisturbanceFRCC-FRG 1322.52 Fire Regime Group III 1.40 Acres Construction DisturbanceFRCC-FRG 1322.52 Fire Regime Group III 0.30 Acres Operation DisturbanceFRCC-FRG 1322.52 Fire Regime Group IV 9.69 Acres Construction DisturbanceFRCC-FRG 1322.52 Fire Regime Group IV 2.04 Acres Operation DisturbanceFRCC-FRG 1322.52 Fire Regime Group V 0.05 Acres Construction DisturbanceFRCC-FRG 1322.52 Fire Regime Group V 0.01 Acres Operation DisturbanceFRCC-FRG 1322.53 Fire Regime Group I 0.13 Acres Construction Disturbance

Page 98: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

FRCC-FRG 1322.53 Fire Regime Group I 0.04 Acres Operation DisturbanceFRCC-FRG 1322.53 Fire Regime Group III 7.34 Acres Construction DisturbanceFRCC-FRG 1322.53 Fire Regime Group III 1.95 Acres Operation DisturbanceFRCC-FRG 1322.53 Fire Regime Group IV 16.36 Acres Construction DisturbanceFRCC-FRG 1322.53 Fire Regime Group IV 4.35 Acres Operation DisturbanceFRCC-FRG 1322.53 Fire Regime Group V 1.26 Acres Construction DisturbanceFRCC-FRG 1322.53 Fire Regime Group V 0.34 Acres Operation DisturbanceFRCC-FRG 1322.53 Indeterminate Fire Regime Characteristics 0.02 Acres Construction DisturbanceFRCC-FRG 1322.53 Indeterminate Fire Regime Characteristics 0.00 Acres Operation DisturbanceFRCC-FRG 1322.53 Sparsely Vegetated 0.15 Acres Construction DisturbanceFRCC-FRG 1322.53 Sparsely Vegetated 0.04 Acres Operation DisturbanceFRCC-FRG 1322.71 Barren 0.50 Acres Construction DisturbanceFRCC-FRG 1322.71 Barren 0.14 Acres Operation DisturbanceFRCC-FRG 1322.71 Fire Regime Group I 2.68 Acres Construction DisturbanceFRCC-FRG 1322.71 Fire Regime Group I 0.75 Acres Operation DisturbanceFRCC-FRG 1322.71 Fire Regime Group III 53.95 Acres Construction DisturbanceFRCC-FRG 1322.71 Fire Regime Group III 15.15 Acres Operation DisturbanceFRCC-FRG 1322.71 Fire Regime Group IV 143.65 Acres Construction DisturbanceFRCC-FRG 1322.71 Fire Regime Group IV 40.39 Acres Operation DisturbanceFRCC-FRG 1322.71 Fire Regime Group V 4.81 Acres Construction DisturbanceFRCC-FRG 1322.71 Fire Regime Group V 1.34 Acres Operation DisturbanceFRCC-FRG 1322.71 Indeterminate Fire Regime Characteristics 0.05 Acres Construction DisturbanceFRCC-FRG 1322.71 Indeterminate Fire Regime Characteristics 0.01 Acres Operation DisturbanceFRCC-FRG 1322.71 Sparsely Vegetated 0.25 Acres Construction DisturbanceFRCC-FRG 1322.71 Sparsely Vegetated 0.07 Acres Operation DisturbanceFRCC-FRG 1322.71 Water 0.08 Acres Construction DisturbanceFRCC-FRG 1322.71 Water 0.02 Acres Operation DisturbanceFRCC-FRG 1323.01 Barren 1.95 Acres Construction DisturbanceFRCC-FRG 1323.01 Barren 0.48 Acres Operation DisturbanceFRCC-FRG 1323.01 Fire Regime Group I 1.51 Acres Construction DisturbanceFRCC-FRG 1323.01 Fire Regime Group I 0.40 Acres Operation DisturbanceFRCC-FRG 1323.01 Fire Regime Group III 27.90 Acres Construction DisturbanceFRCC-FRG 1323.01 Fire Regime Group III 7.47 Acres Operation DisturbanceFRCC-FRG 1323.01 Fire Regime Group IV 59.77 Acres Construction DisturbanceFRCC-FRG 1323.01 Fire Regime Group IV 15.26 Acres Operation DisturbanceFRCC-FRG 1323.01 Fire Regime Group V 1.63 Acres Construction DisturbanceFRCC-FRG 1323.01 Fire Regime Group V 0.41 Acres Operation DisturbanceFRCC-FRG 1323.01 Indeterminate Fire Regime Characteristics 0.03 Acres Construction DisturbanceFRCC-FRG 1323.01 Indeterminate Fire Regime Characteristics 0.01 Acres Operation DisturbanceFRCC-FRG 1323.01 Sparsely Vegetated 0.95 Acres Construction DisturbanceFRCC-FRG 1323.01 Sparsely Vegetated 0.25 Acres Operation DisturbanceFRCC-FRG 1323.02 Barren 0.86 Acres Construction DisturbanceFRCC-FRG 1323.02 Barren 0.46 Acres Operation DisturbanceFRCC-FRG 1323.02 Fire Regime Group I 6.97 Acres Construction DisturbanceFRCC-FRG 1323.02 Fire Regime Group I 2.60 Acres Operation Disturbance

Page 99: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

FRCC-FRG 1323.02 Fire Regime Group III 66.26 Acres Construction DisturbanceFRCC-FRG 1323.02 Fire Regime Group III 22.77 Acres Operation DisturbanceFRCC-FRG 1323.02 Fire Regime Group IV 162.57 Acres Construction DisturbanceFRCC-FRG 1323.02 Fire Regime Group IV 55.52 Acres Operation DisturbanceFRCC-FRG 1323.02 Fire Regime Group V 5.48 Acres Construction DisturbanceFRCC-FRG 1323.02 Fire Regime Group V 1.64 Acres Operation DisturbanceFRCC-FRG 1323.02 Sparsely Vegetated 0.34 Acres Construction DisturbanceFRCC-FRG 1323.02 Sparsely Vegetated 0.09 Acres Operation DisturbanceFRCC-FRG 1324 Barren 0.05 Acres Construction DisturbanceFRCC-FRG 1324 Barren 0.04 Acres Operation DisturbanceFRCC-FRG 1324 Fire Regime Group I 0.60 Acres Construction DisturbanceFRCC-FRG 1324 Fire Regime Group I 0.30 Acres Operation DisturbanceFRCC-FRG 1324 Fire Regime Group III 21.38 Acres Construction DisturbanceFRCC-FRG 1324 Fire Regime Group III 8.57 Acres Operation DisturbanceFRCC-FRG 1324 Fire Regime Group IV 56.12 Acres Construction DisturbanceFRCC-FRG 1324 Fire Regime Group IV 23.17 Acres Operation DisturbanceFRCC-FRG 1324 Fire Regime Group V 2.09 Acres Construction DisturbanceFRCC-FRG 1324 Fire Regime Group V 0.71 Acres Operation DisturbanceFRCC-FRG 1324 Sparsely Vegetated 0.33 Acres Construction DisturbanceFRCC-FRG 1324 Sparsely Vegetated 0.12 Acres Operation DisturbanceFRCC-FRG 1325 Barren 0.03 Acres Construction DisturbanceFRCC-FRG 1325 Barren 0.01 Acres Operation DisturbanceFRCC-FRG 1325 Fire Regime Group I 2.67 Acres Construction DisturbanceFRCC-FRG 1325 Fire Regime Group I 1.02 Acres Operation DisturbanceFRCC-FRG 1325 Fire Regime Group III 82.74 Acres Construction DisturbanceFRCC-FRG 1325 Fire Regime Group III 33.26 Acres Operation DisturbanceFRCC-FRG 1325 Fire Regime Group IV 73.07 Acres Construction DisturbanceFRCC-FRG 1325 Fire Regime Group IV 29.93 Acres Operation DisturbanceFRCC-FRG 1325 Fire Regime Group V 0.24 Acres Construction DisturbanceFRCC-FRG 1325 Fire Regime Group V 0.09 Acres Operation DisturbanceFRCC-FRG 1325 Sparsely Vegetated 0.00 Acres Construction DisturbanceFRCC-FRG 1325 Sparsely Vegetated 0.00 Acres Operation DisturbanceFRCC-FRG 1350 Barren 0.13 Acres Construction DisturbanceFRCC-FRG 1350 Barren 0.06 Acres Operation DisturbanceFRCC-FRG 1350 Fire Regime Group I 0.14 Acres Construction DisturbanceFRCC-FRG 1350 Fire Regime Group I 0.06 Acres Operation DisturbanceFRCC-FRG 1350 Fire Regime Group III 83.12 Acres Construction DisturbanceFRCC-FRG 1350 Fire Regime Group III 28.29 Acres Operation DisturbanceFRCC-FRG 1350 Fire Regime Group IV 157.58 Acres Construction DisturbanceFRCC-FRG 1350 Fire Regime Group IV 57.80 Acres Operation DisturbanceFRCC-FRG 1350 Fire Regime Group V 3.19 Acres Construction DisturbanceFRCC-FRG 1350 Fire Regime Group V 1.32 Acres Operation DisturbanceFRCC-FRG 1350 Sparsely Vegetated 0.01 Acres Construction DisturbanceFRCC-FRG 1350 Sparsely Vegetated 0.00 Acres Operation DisturbanceFRCC-FRG 1360 Barren 0.04 Acres Construction Disturbance

Page 100: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

FRCC-FRG 1360 Barren 0.02 Acres Operation DisturbanceFRCC-FRG 1360 Fire Regime Group I 1.01 Acres Construction DisturbanceFRCC-FRG 1360 Fire Regime Group I 0.24 Acres Operation DisturbanceFRCC-FRG 1360 Fire Regime Group III 20.61 Acres Construction DisturbanceFRCC-FRG 1360 Fire Regime Group III 5.05 Acres Operation DisturbanceFRCC-FRG 1360 Fire Regime Group IV 291.47 Acres Construction DisturbanceFRCC-FRG 1360 Fire Regime Group IV 64.02 Acres Operation DisturbanceFRCC-FRG 1360 Fire Regime Group V 65.83 Acres Construction DisturbanceFRCC-FRG 1360 Fire Regime Group V 17.83 Acres Operation DisturbanceFRCC-FRG 1430 Barren 15.00 Acres Construction DisturbanceFRCC-FRG 1430 Barren 3.02 Acres Operation DisturbanceFRCC-FRG 1430 Fire Regime Group III 0.28 Acres Construction DisturbanceFRCC-FRG 1430 Fire Regime Group III 0.06 Acres Operation DisturbanceFRCC-FRG 1430 Fire Regime Group IV 0.17 Acres Construction DisturbanceFRCC-FRG 1430 Fire Regime Group IV 0.03 Acres Operation DisturbanceFRCC-FRG 1430 Fire Regime Group V 205.34 Acres Construction DisturbanceFRCC-FRG 1430 Fire Regime Group V 41.23 Acres Operation DisturbanceFRCC-FRG 1430 Sparsely Vegetated 1.06 Acres Construction DisturbanceFRCC-FRG 1430 Sparsely Vegetated 0.21 Acres Operation DisturbanceFRCC-FRG 1430 Water 0.29 Acres Construction DisturbanceFRCC-FRG 1430 Water 0.06 Acres Operation DisturbanceFRCC-VCC 1210 Agriculture 0.01 Acres Construction DisturbanceFRCC-VCC 1210 Agriculture 0.00 Acres Operation DisturbanceFRCC-VCC 1210 Barren 0.13 Acres Construction DisturbanceFRCC-VCC 1210 Barren 0.06 Acres Operation DisturbanceFRCC-VCC 1210 Sparsely Vegetated 0.02 Acres Construction DisturbanceFRCC-VCC 1210 Sparsely Vegetated 0.01 Acres Operation DisturbanceFRCC-VCC 1210 Urban 1.51 Acres Construction DisturbanceFRCC-VCC 1210 Urban 0.34 Acres Operation DisturbanceFRCC-VCC 1210 Vegetation Condition Class I 51.97 Acres Construction DisturbanceFRCC-VCC 1210 Vegetation Condition Class I 10.46 Acres Operation DisturbanceFRCC-VCC 1210 Vegetation Condition Class II 257.31 Acres Construction DisturbanceFRCC-VCC 1210 Vegetation Condition Class II 50.23 Acres Operation DisturbanceFRCC-VCC 1210 Vegetation Condition Class III 1.30 Acres Construction DisturbanceFRCC-VCC 1210 Vegetation Condition Class III 0.54 Acres Operation DisturbanceFRCC-VCC 1210 Water 0.01 Acres Construction DisturbanceFRCC-VCC 1210 Water 0.00 Acres Operation DisturbanceFRCC-VCC 1211 Barren 0.65 Acres Construction DisturbanceFRCC-VCC 1211 Barren 0.16 Acres Operation DisturbanceFRCC-VCC 1211 Sparsely Vegetated 0.23 Acres Construction DisturbanceFRCC-VCC 1211 Sparsely Vegetated 0.05 Acres Operation DisturbanceFRCC-VCC 1211 Urban 0.48 Acres Construction DisturbanceFRCC-VCC 1211 Urban 0.11 Acres Operation DisturbanceFRCC-VCC 1211 Vegetation Condition Class I 12.71 Acres Construction DisturbanceFRCC-VCC 1211 Vegetation Condition Class I 2.98 Acres Operation Disturbance

Page 101: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

FRCC-VCC 1211 Vegetation Condition Class II 66.02 Acres Construction DisturbanceFRCC-VCC 1211 Vegetation Condition Class II 15.41 Acres Operation DisturbanceFRCC-VCC 1211 Vegetation Condition Class III 22.86 Acres Construction DisturbanceFRCC-VCC 1211 Vegetation Condition Class III 5.20 Acres Operation DisturbanceFRCC-VCC 1212 Barren 21.59 Acres Construction DisturbanceFRCC-VCC 1212 Barren 9.16 Acres Operation DisturbanceFRCC-VCC 1212 Sparsely Vegetated 0.97 Acres Construction DisturbanceFRCC-VCC 1212 Sparsely Vegetated 0.44 Acres Operation DisturbanceFRCC-VCC 1212 Urban 1.24 Acres Construction DisturbanceFRCC-VCC 1212 Urban 0.47 Acres Operation DisturbanceFRCC-VCC 1212 Vegetation Condition Class I 5.81 Acres Construction DisturbanceFRCC-VCC 1212 Vegetation Condition Class I 2.43 Acres Operation DisturbanceFRCC-VCC 1212 Vegetation Condition Class II 39.72 Acres Construction DisturbanceFRCC-VCC 1212 Vegetation Condition Class II 17.35 Acres Operation DisturbanceFRCC-VCC 1212 Vegetation Condition Class III 157.75 Acres Construction DisturbanceFRCC-VCC 1212 Vegetation Condition Class III 63.02 Acres Operation DisturbanceFRCC-VCC 1214 Barren 2.48 Acres Construction DisturbanceFRCC-VCC 1214 Barren 0.53 Acres Operation DisturbanceFRCC-VCC 1214 Sparsely Vegetated 0.20 Acres Construction DisturbanceFRCC-VCC 1214 Sparsely Vegetated 0.04 Acres Operation DisturbanceFRCC-VCC 1214 Urban 0.47 Acres Construction DisturbanceFRCC-VCC 1214 Urban 0.12 Acres Operation DisturbanceFRCC-VCC 1214 Vegetation Condition Class I 11.01 Acres Construction DisturbanceFRCC-VCC 1214 Vegetation Condition Class I 2.67 Acres Operation DisturbanceFRCC-VCC 1214 Vegetation Condition Class II 116.12 Acres Construction DisturbanceFRCC-VCC 1214 Vegetation Condition Class II 26.76 Acres Operation DisturbanceFRCC-VCC 1214 Vegetation Condition Class III 15.09 Acres Construction DisturbanceFRCC-VCC 1214 Vegetation Condition Class III 3.47 Acres Operation DisturbanceFRCC-VCC 1215 Barren 0.39 Acres Construction DisturbanceFRCC-VCC 1215 Barren 0.09 Acres Operation DisturbanceFRCC-VCC 1215 Sparsely Vegetated 0.01 Acres Construction DisturbanceFRCC-VCC 1215 Sparsely Vegetated 0.00 Acres Operation DisturbanceFRCC-VCC 1215 Urban 0.51 Acres Construction DisturbanceFRCC-VCC 1215 Urban 0.11 Acres Operation DisturbanceFRCC-VCC 1215 Vegetation Condition Class I 2.74 Acres Construction DisturbanceFRCC-VCC 1215 Vegetation Condition Class I 0.61 Acres Operation DisturbanceFRCC-VCC 1215 Vegetation Condition Class II 84.24 Acres Construction DisturbanceFRCC-VCC 1215 Vegetation Condition Class II 18.44 Acres Operation DisturbanceFRCC-VCC 1215 Vegetation Condition Class III 4.60 Acres Construction DisturbanceFRCC-VCC 1215 Vegetation Condition Class III 1.13 Acres Operation DisturbanceFRCC-VCC 1215.05 Barren 24.59 Acres Construction DisturbanceFRCC-VCC 1215.05 Barren 7.03 Acres Operation DisturbanceFRCC-VCC 1215.05 Sparsely Vegetated 0.55 Acres Construction DisturbanceFRCC-VCC 1215.05 Sparsely Vegetated 0.17 Acres Operation DisturbanceFRCC-VCC 1215.05 Urban 0.16 Acres Construction Disturbance

Page 102: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

FRCC-VCC 1215.05 Urban 0.08 Acres Operation DisturbanceFRCC-VCC 1215.05 Vegetation Condition Class I 3.97 Acres Construction DisturbanceFRCC-VCC 1215.05 Vegetation Condition Class I 1.17 Acres Operation DisturbanceFRCC-VCC 1215.05 Vegetation Condition Class II 48.89 Acres Construction DisturbanceFRCC-VCC 1215.05 Vegetation Condition Class II 14.36 Acres Operation DisturbanceFRCC-VCC 1215.05 Vegetation Condition Class III 62.52 Acres Construction DisturbanceFRCC-VCC 1215.05 Vegetation Condition Class III 20.14 Acres Operation DisturbanceFRCC-VCC 1320.05 Agriculture 43.31 Acres Construction DisturbanceFRCC-VCC 1320.05 Agriculture 7.58 Acres Operation DisturbanceFRCC-VCC 1320.05 Barren 10.83 Acres Construction DisturbanceFRCC-VCC 1320.05 Barren 2.20 Acres Operation DisturbanceFRCC-VCC 1320.05 Sparsely Vegetated 2.18 Acres Construction DisturbanceFRCC-VCC 1320.05 Sparsely Vegetated 0.47 Acres Operation DisturbanceFRCC-VCC 1320.05 Urban 7.08 Acres Construction DisturbanceFRCC-VCC 1320.05 Urban 1.25 Acres Operation DisturbanceFRCC-VCC 1320.05 Vegetation Condition Class I 105.95 Acres Construction DisturbanceFRCC-VCC 1320.05 Vegetation Condition Class I 17.00 Acres Operation DisturbanceFRCC-VCC 1320.05 Vegetation Condition Class II 27.29 Acres Construction DisturbanceFRCC-VCC 1320.05 Vegetation Condition Class II 4.67 Acres Operation DisturbanceFRCC-VCC 1320.05 Vegetation Condition Class III 297.58 Acres Construction DisturbanceFRCC-VCC 1320.05 Vegetation Condition Class III 49.65 Acres Operation DisturbanceFRCC-VCC 1320.05 Vegetation Condition Class not calculated 0.10 Acres Construction DisturbanceFRCC-VCC 1320.05 Vegetation Condition Class not calculated 0.02 Acres Operation DisturbanceFRCC-VCC 1320.05 Water 5.24 Acres Construction DisturbanceFRCC-VCC 1320.05 Water 1.04 Acres Operation DisturbanceFRCC-VCC 1320.15 Agriculture 6.43 Acres Construction DisturbanceFRCC-VCC 1320.15 Agriculture 3.12 Acres Operation DisturbanceFRCC-VCC 1320.15 Barren 0.09 Acres Construction DisturbanceFRCC-VCC 1320.15 Barren 0.03 Acres Operation DisturbanceFRCC-VCC 1320.15 Sparsely Vegetated 0.15 Acres Construction DisturbanceFRCC-VCC 1320.15 Sparsely Vegetated 0.07 Acres Operation DisturbanceFRCC-VCC 1320.15 Urban 4.03 Acres Construction DisturbanceFRCC-VCC 1320.15 Urban 1.90 Acres Operation DisturbanceFRCC-VCC 1320.15 Vegetation Condition Class I 85.00 Acres Construction DisturbanceFRCC-VCC 1320.15 Vegetation Condition Class I 34.52 Acres Operation DisturbanceFRCC-VCC 1320.15 Vegetation Condition Class II 358.38 Acres Construction DisturbanceFRCC-VCC 1320.15 Vegetation Condition Class II 139.70 Acres Operation DisturbanceFRCC-VCC 1320.15 Vegetation Condition Class III 47.70 Acres Construction DisturbanceFRCC-VCC 1320.15 Vegetation Condition Class III 18.76 Acres Operation DisturbanceFRCC-VCC 1320.15 Water 0.01 Acres Construction DisturbanceFRCC-VCC 1320.15 Water 0.00 Acres Operation DisturbanceFRCC-VCC 1320.2 Agriculture 0.59 Acres Construction DisturbanceFRCC-VCC 1320.2 Agriculture 0.22 Acres Operation DisturbanceFRCC-VCC 1320.2 Sparsely Vegetated 0.01 Acres Construction DisturbanceFRCC-VCC 1320.2 Sparsely Vegetated 0.01 Acres Operation Disturbance

Page 103: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

FRCC-VCC 1320.2 Urban 1.00 Acres Construction DisturbanceFRCC-VCC 1320.2 Urban 0.38 Acres Operation DisturbanceFRCC-VCC 1320.2 Vegetation Condition Class I 29.58 Acres Construction DisturbanceFRCC-VCC 1320.2 Vegetation Condition Class I 11.26 Acres Operation DisturbanceFRCC-VCC 1320.2 Vegetation Condition Class II 84.68 Acres Construction DisturbanceFRCC-VCC 1320.2 Vegetation Condition Class II 31.98 Acres Operation DisturbanceFRCC-VCC 1320.2 Vegetation Condition Class III 4.39 Acres Construction DisturbanceFRCC-VCC 1320.2 Vegetation Condition Class III 1.91 Acres Operation DisturbanceFRCC-VCC 1320.21 Agriculture 0.04 Acres Construction DisturbanceFRCC-VCC 1320.21 Agriculture 0.01 Acres Operation DisturbanceFRCC-VCC 1320.21 Urban 0.15 Acres Construction DisturbanceFRCC-VCC 1320.21 Urban 0.05 Acres Operation DisturbanceFRCC-VCC 1320.21 Vegetation Condition Class I 1.33 Acres Construction DisturbanceFRCC-VCC 1320.21 Vegetation Condition Class I 0.61 Acres Operation DisturbanceFRCC-VCC 1320.21 Vegetation Condition Class II 3.91 Acres Construction DisturbanceFRCC-VCC 1320.21 Vegetation Condition Class II 1.42 Acres Operation DisturbanceFRCC-VCC 1320.21 Vegetation Condition Class III 0.19 Acres Construction DisturbanceFRCC-VCC 1320.21 Vegetation Condition Class III 0.06 Acres Operation DisturbanceFRCC-VCC 1321.01 Agriculture 46.84 Acres Construction DisturbanceFRCC-VCC 1321.01 Agriculture 6.64 Acres Operation DisturbanceFRCC-VCC 1321.01 Barren 2.68 Acres Construction DisturbanceFRCC-VCC 1321.01 Barren 0.65 Acres Operation DisturbanceFRCC-VCC 1321.01 Sparsely Vegetated 0.47 Acres Construction DisturbanceFRCC-VCC 1321.01 Sparsely Vegetated 0.16 Acres Operation DisturbanceFRCC-VCC 1321.01 Urban 2.82 Acres Construction DisturbanceFRCC-VCC 1321.01 Urban 0.60 Acres Operation DisturbanceFRCC-VCC 1321.01 Vegetation Condition Class I 70.81 Acres Construction DisturbanceFRCC-VCC 1321.01 Vegetation Condition Class I 15.33 Acres Operation DisturbanceFRCC-VCC 1321.01 Vegetation Condition Class II 141.80 Acres Construction DisturbanceFRCC-VCC 1321.01 Vegetation Condition Class II 27.40 Acres Operation DisturbanceFRCC-VCC 1321.01 Vegetation Condition Class III 141.61 Acres Construction DisturbanceFRCC-VCC 1321.01 Vegetation Condition Class III 22.77 Acres Operation DisturbanceFRCC-VCC 1321.01 Vegetation Condition Class not calculated 0.00 Acres Construction DisturbanceFRCC-VCC 1321.01 Vegetation Condition Class not calculated 0.00 Acres Operation DisturbanceFRCC-VCC 1321.01 Water 0.37 Acres Construction DisturbanceFRCC-VCC 1321.01 Water 0.16 Acres Operation DisturbanceFRCC-VCC 1321.02 Vegetation Condition Class I 0.89 Acres Construction DisturbanceFRCC-VCC 1321.02 Vegetation Condition Class I 0.27 Acres Operation DisturbanceFRCC-VCC 1321.02 Vegetation Condition Class II 15.15 Acres Construction DisturbanceFRCC-VCC 1321.02 Vegetation Condition Class II 1.31 Acres Operation DisturbanceFRCC-VCC 1321.02 Vegetation Condition Class III 0.09 Acres Construction DisturbanceFRCC-VCC 1321.02 Vegetation Condition Class III 0.03 Acres Operation DisturbanceFRCC-VCC 1322.01 Vegetation Condition Class I 2.35 Acres Construction DisturbanceFRCC-VCC 1322.01 Vegetation Condition Class I 0.59 Acres Operation DisturbanceFRCC-VCC 1322.01 Vegetation Condition Class II 17.79 Acres Construction Disturbance

Page 104: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

FRCC-VCC 1322.01 Vegetation Condition Class II 2.43 Acres Operation DisturbanceFRCC-VCC 1322.01 Vegetation Condition Class III 0.04 Acres Construction DisturbanceFRCC-VCC 1322.01 Vegetation Condition Class III 0.01 Acres Operation DisturbanceFRCC-VCC 1322.02 Urban 0.28 Acres Construction DisturbanceFRCC-VCC 1322.02 Urban 0.06 Acres Operation DisturbanceFRCC-VCC 1322.02 Vegetation Condition Class I 6.79 Acres Construction DisturbanceFRCC-VCC 1322.02 Vegetation Condition Class I 1.43 Acres Operation DisturbanceFRCC-VCC 1322.02 Vegetation Condition Class II 51.15 Acres Construction DisturbanceFRCC-VCC 1322.02 Vegetation Condition Class II 10.75 Acres Operation DisturbanceFRCC-VCC 1322.02 Vegetation Condition Class III 0.04 Acres Construction DisturbanceFRCC-VCC 1322.02 Vegetation Condition Class III 0.01 Acres Operation DisturbanceFRCC-VCC 1322.11 Urban 0.20 Acres Construction DisturbanceFRCC-VCC 1322.11 Urban 0.03 Acres Operation DisturbanceFRCC-VCC 1322.11 Vegetation Condition Class I 5.38 Acres Construction DisturbanceFRCC-VCC 1322.11 Vegetation Condition Class I 0.83 Acres Operation DisturbanceFRCC-VCC 1322.11 Vegetation Condition Class II 36.30 Acres Construction DisturbanceFRCC-VCC 1322.11 Vegetation Condition Class II 5.61 Acres Operation DisturbanceFRCC-VCC 1322.11 Vegetation Condition Class III 0.09 Acres Construction DisturbanceFRCC-VCC 1322.11 Vegetation Condition Class III 0.01 Acres Operation DisturbanceFRCC-VCC 1322.12 Agriculture 1.87 Acres Construction DisturbanceFRCC-VCC 1322.12 Agriculture 0.25 Acres Operation DisturbanceFRCC-VCC 1322.12 Urban 0.78 Acres Construction DisturbanceFRCC-VCC 1322.12 Urban 0.11 Acres Operation DisturbanceFRCC-VCC 1322.12 Vegetation Condition Class I 7.06 Acres Construction DisturbanceFRCC-VCC 1322.12 Vegetation Condition Class I 0.96 Acres Operation DisturbanceFRCC-VCC 1322.12 Vegetation Condition Class II 15.96 Acres Construction DisturbanceFRCC-VCC 1322.12 Vegetation Condition Class II 2.17 Acres Operation DisturbanceFRCC-VCC 1322.12 Vegetation Condition Class III 0.18 Acres Construction DisturbanceFRCC-VCC 1322.12 Vegetation Condition Class III 0.03 Acres Operation DisturbanceFRCC-VCC 1322.21 Agriculture 0.47 Acres Construction DisturbanceFRCC-VCC 1322.21 Agriculture 0.11 Acres Operation DisturbanceFRCC-VCC 1322.21 Sparsely Vegetated 0.00 Acres Construction DisturbanceFRCC-VCC 1322.21 Sparsely Vegetated 0.00 Acres Operation DisturbanceFRCC-VCC 1322.21 Urban 0.64 Acres Construction DisturbanceFRCC-VCC 1322.21 Urban 0.16 Acres Operation DisturbanceFRCC-VCC 1322.21 Vegetation Condition Class I 8.80 Acres Construction DisturbanceFRCC-VCC 1322.21 Vegetation Condition Class I 2.16 Acres Operation DisturbanceFRCC-VCC 1322.21 Vegetation Condition Class II 13.49 Acres Construction DisturbanceFRCC-VCC 1322.21 Vegetation Condition Class II 3.32 Acres Operation DisturbanceFRCC-VCC 1322.21 Vegetation Condition Class III 0.09 Acres Construction DisturbanceFRCC-VCC 1322.21 Vegetation Condition Class III 0.02 Acres Operation DisturbanceFRCC-VCC 1322.22 Agriculture 4.12 Acres Construction DisturbanceFRCC-VCC 1322.22 Agriculture 0.56 Acres Operation DisturbanceFRCC-VCC 1322.22 Barren 0.05 Acres Construction DisturbanceFRCC-VCC 1322.22 Barren 0.01 Acres Operation Disturbance

Page 105: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

FRCC-VCC 1322.22 Sparsely Vegetated 0.07 Acres Construction DisturbanceFRCC-VCC 1322.22 Sparsely Vegetated 0.01 Acres Operation DisturbanceFRCC-VCC 1322.22 Urban 2.44 Acres Construction DisturbanceFRCC-VCC 1322.22 Urban 0.33 Acres Operation DisturbanceFRCC-VCC 1322.22 Vegetation Condition Class I 8.96 Acres Construction DisturbanceFRCC-VCC 1322.22 Vegetation Condition Class I 1.21 Acres Operation DisturbanceFRCC-VCC 1322.22 Vegetation Condition Class II 40.79 Acres Construction DisturbanceFRCC-VCC 1322.22 Vegetation Condition Class II 5.53 Acres Operation DisturbanceFRCC-VCC 1322.22 Vegetation Condition Class III 0.04 Acres Construction DisturbanceFRCC-VCC 1322.22 Vegetation Condition Class III 0.00 Acres Operation DisturbanceFRCC-VCC 1322.23 Agriculture 0.57 Acres Construction DisturbanceFRCC-VCC 1322.23 Agriculture 0.06 Acres Operation DisturbanceFRCC-VCC 1322.23 Barren 0.01 Acres Construction DisturbanceFRCC-VCC 1322.23 Barren 0.00 Acres Operation DisturbanceFRCC-VCC 1322.23 Sparsely Vegetated 0.41 Acres Construction DisturbanceFRCC-VCC 1322.23 Sparsely Vegetated 0.04 Acres Operation DisturbanceFRCC-VCC 1322.23 Urban 1.13 Acres Construction DisturbanceFRCC-VCC 1322.23 Urban 0.12 Acres Operation DisturbanceFRCC-VCC 1322.23 Vegetation Condition Class I 11.28 Acres Construction DisturbanceFRCC-VCC 1322.23 Vegetation Condition Class I 2.06 Acres Operation DisturbanceFRCC-VCC 1322.23 Vegetation Condition Class II 13.44 Acres Construction DisturbanceFRCC-VCC 1322.23 Vegetation Condition Class II 2.96 Acres Operation DisturbanceFRCC-VCC 1322.23 Vegetation Condition Class III 1.90 Acres Construction DisturbanceFRCC-VCC 1322.23 Vegetation Condition Class III 0.20 Acres Operation DisturbanceFRCC-VCC 1322.51 Urban 1.86 Acres Construction DisturbanceFRCC-VCC 1322.51 Urban 0.31 Acres Operation DisturbanceFRCC-VCC 1322.51 Vegetation Condition Class I 8.89 Acres Construction DisturbanceFRCC-VCC 1322.51 Vegetation Condition Class I 1.46 Acres Operation DisturbanceFRCC-VCC 1322.51 Vegetation Condition Class II 63.18 Acres Construction DisturbanceFRCC-VCC 1322.51 Vegetation Condition Class II 10.36 Acres Operation DisturbanceFRCC-VCC 1322.51 Vegetation Condition Class III 0.01 Acres Construction DisturbanceFRCC-VCC 1322.51 Vegetation Condition Class III 0.00 Acres Operation DisturbanceFRCC-VCC 1322.52 Vegetation Condition Class I 1.39 Acres Construction DisturbanceFRCC-VCC 1322.52 Vegetation Condition Class I 0.29 Acres Operation DisturbanceFRCC-VCC 1322.52 Vegetation Condition Class II 9.75 Acres Construction DisturbanceFRCC-VCC 1322.52 Vegetation Condition Class II 2.05 Acres Operation DisturbanceFRCC-VCC 1322.53 Agriculture 0.41 Acres Construction DisturbanceFRCC-VCC 1322.53 Agriculture 0.11 Acres Operation DisturbanceFRCC-VCC 1322.53 Sparsely Vegetated 0.15 Acres Construction DisturbanceFRCC-VCC 1322.53 Sparsely Vegetated 0.04 Acres Operation DisturbanceFRCC-VCC 1322.53 Urban 0.00 Acres Construction DisturbanceFRCC-VCC 1322.53 Urban 0.00 Acres Operation DisturbanceFRCC-VCC 1322.53 Vegetation Condition Class I 5.46 Acres Construction DisturbanceFRCC-VCC 1322.53 Vegetation Condition Class I 1.45 Acres Operation DisturbanceFRCC-VCC 1322.53 Vegetation Condition Class II 19.10 Acres Construction Disturbance

Page 106: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

FRCC-VCC 1322.53 Vegetation Condition Class II 5.08 Acres Operation DisturbanceFRCC-VCC 1322.53 Vegetation Condition Class III 0.15 Acres Construction DisturbanceFRCC-VCC 1322.53 Vegetation Condition Class III 0.04 Acres Operation DisturbanceFRCC-VCC 1322.71 Agriculture 1.46 Acres Construction DisturbanceFRCC-VCC 1322.71 Agriculture 0.41 Acres Operation DisturbanceFRCC-VCC 1322.71 Barren 0.50 Acres Construction DisturbanceFRCC-VCC 1322.71 Barren 0.14 Acres Operation DisturbanceFRCC-VCC 1322.71 Sparsely Vegetated 0.32 Acres Construction DisturbanceFRCC-VCC 1322.71 Sparsely Vegetated 0.09 Acres Operation DisturbanceFRCC-VCC 1322.71 Urban 1.82 Acres Construction DisturbanceFRCC-VCC 1322.71 Urban 0.52 Acres Operation DisturbanceFRCC-VCC 1322.71 Vegetation Condition Class I 60.69 Acres Construction DisturbanceFRCC-VCC 1322.71 Vegetation Condition Class I 17.05 Acres Operation DisturbanceFRCC-VCC 1322.71 Vegetation Condition Class II 134.79 Acres Construction DisturbanceFRCC-VCC 1322.71 Vegetation Condition Class II 37.88 Acres Operation DisturbanceFRCC-VCC 1322.71 Vegetation Condition Class III 6.31 Acres Construction DisturbanceFRCC-VCC 1322.71 Vegetation Condition Class III 1.77 Acres Operation DisturbanceFRCC-VCC 1322.71 Vegetation Condition Class not calculated 0.01 Acres Construction DisturbanceFRCC-VCC 1322.71 Vegetation Condition Class not calculated 0.00 Acres Operation DisturbanceFRCC-VCC 1322.71 Water 0.08 Acres Construction DisturbanceFRCC-VCC 1322.71 Water 0.02 Acres Operation DisturbanceFRCC-VCC 1323.01 Agriculture 3.51 Acres Construction DisturbanceFRCC-VCC 1323.01 Agriculture 0.86 Acres Operation DisturbanceFRCC-VCC 1323.01 Barren 1.95 Acres Construction DisturbanceFRCC-VCC 1323.01 Barren 0.48 Acres Operation DisturbanceFRCC-VCC 1323.01 Sparsely Vegetated 1.09 Acres Construction DisturbanceFRCC-VCC 1323.01 Sparsely Vegetated 0.28 Acres Operation DisturbanceFRCC-VCC 1323.01 Urban 2.43 Acres Construction DisturbanceFRCC-VCC 1323.01 Urban 0.63 Acres Operation DisturbanceFRCC-VCC 1323.01 Vegetation Condition Class I 21.69 Acres Construction DisturbanceFRCC-VCC 1323.01 Vegetation Condition Class I 5.84 Acres Operation DisturbanceFRCC-VCC 1323.01 Vegetation Condition Class II 61.47 Acres Construction DisturbanceFRCC-VCC 1323.01 Vegetation Condition Class II 15.79 Acres Operation DisturbanceFRCC-VCC 1323.01 Vegetation Condition Class III 1.55 Acres Construction DisturbanceFRCC-VCC 1323.01 Vegetation Condition Class III 0.38 Acres Operation DisturbanceFRCC-VCC 1323.01 Vegetation Condition Class not calculated 0.06 Acres Construction DisturbanceFRCC-VCC 1323.01 Vegetation Condition Class not calculated 0.01 Acres Operation DisturbanceFRCC-VCC 1323.02 Barren 0.86 Acres Construction DisturbanceFRCC-VCC 1323.02 Barren 0.46 Acres Operation DisturbanceFRCC-VCC 1323.02 Sparsely Vegetated 0.34 Acres Construction DisturbanceFRCC-VCC 1323.02 Sparsely Vegetated 0.09 Acres Operation DisturbanceFRCC-VCC 1323.02 Urban 1.70 Acres Construction DisturbanceFRCC-VCC 1323.02 Urban 0.53 Acres Operation DisturbanceFRCC-VCC 1323.02 Vegetation Condition Class I 159.36 Acres Construction DisturbanceFRCC-VCC 1323.02 Vegetation Condition Class I 55.12 Acres Operation Disturbance

Page 107: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

FRCC-VCC 1323.02 Vegetation Condition Class II 67.95 Acres Construction DisturbanceFRCC-VCC 1323.02 Vegetation Condition Class II 22.10 Acres Operation DisturbanceFRCC-VCC 1323.02 Vegetation Condition Class III 12.27 Acres Construction DisturbanceFRCC-VCC 1323.02 Vegetation Condition Class III 4.78 Acres Operation DisturbanceFRCC-VCC 1324 Barren 0.05 Acres Construction DisturbanceFRCC-VCC 1324 Barren 0.04 Acres Operation DisturbanceFRCC-VCC 1324 Sparsely Vegetated 0.34 Acres Construction DisturbanceFRCC-VCC 1324 Sparsely Vegetated 0.12 Acres Operation DisturbanceFRCC-VCC 1324 Urban 0.12 Acres Construction DisturbanceFRCC-VCC 1324 Urban 0.05 Acres Operation DisturbanceFRCC-VCC 1324 Vegetation Condition Class I 53.07 Acres Construction DisturbanceFRCC-VCC 1324 Vegetation Condition Class I 21.65 Acres Operation DisturbanceFRCC-VCC 1324 Vegetation Condition Class II 25.34 Acres Construction DisturbanceFRCC-VCC 1324 Vegetation Condition Class II 10.30 Acres Operation DisturbanceFRCC-VCC 1324 Vegetation Condition Class III 1.67 Acres Construction DisturbanceFRCC-VCC 1324 Vegetation Condition Class III 0.74 Acres Operation DisturbanceFRCC-VCC 1325 Barren 0.03 Acres Construction DisturbanceFRCC-VCC 1325 Barren 0.01 Acres Operation DisturbanceFRCC-VCC 1325 Sparsely Vegetated 0.00 Acres Construction DisturbanceFRCC-VCC 1325 Sparsely Vegetated 0.00 Acres Operation DisturbanceFRCC-VCC 1325 Urban 0.47 Acres Construction DisturbanceFRCC-VCC 1325 Urban 0.19 Acres Operation DisturbanceFRCC-VCC 1325 Vegetation Condition Class I 2.97 Acres Construction DisturbanceFRCC-VCC 1325 Vegetation Condition Class I 1.42 Acres Operation DisturbanceFRCC-VCC 1325 Vegetation Condition Class II 145.51 Acres Construction DisturbanceFRCC-VCC 1325 Vegetation Condition Class II 58.95 Acres Operation DisturbanceFRCC-VCC 1325 Vegetation Condition Class III 9.77 Acres Construction DisturbanceFRCC-VCC 1325 Vegetation Condition Class III 3.75 Acres Operation DisturbanceFRCC-VCC 1350 Agriculture 12.21 Acres Construction DisturbanceFRCC-VCC 1350 Agriculture 5.68 Acres Operation DisturbanceFRCC-VCC 1350 Barren 0.13 Acres Construction DisturbanceFRCC-VCC 1350 Barren 0.06 Acres Operation DisturbanceFRCC-VCC 1350 Sparsely Vegetated 0.07 Acres Construction DisturbanceFRCC-VCC 1350 Sparsely Vegetated 0.04 Acres Operation DisturbanceFRCC-VCC 1350 Urban 4.38 Acres Construction DisturbanceFRCC-VCC 1350 Urban 1.92 Acres Operation DisturbanceFRCC-VCC 1350 Vegetation Condition Class I 53.50 Acres Construction DisturbanceFRCC-VCC 1350 Vegetation Condition Class I 18.38 Acres Operation DisturbanceFRCC-VCC 1350 Vegetation Condition Class II 144.96 Acres Construction DisturbanceFRCC-VCC 1350 Vegetation Condition Class II 50.79 Acres Operation DisturbanceFRCC-VCC 1350 Vegetation Condition Class III 28.92 Acres Construction DisturbanceFRCC-VCC 1350 Vegetation Condition Class III 10.66 Acres Operation DisturbanceFRCC-VCC 1360 Agriculture 7.37 Acres Construction DisturbanceFRCC-VCC 1360 Agriculture 1.52 Acres Operation DisturbanceFRCC-VCC 1360 Barren 0.04 Acres Construction Disturbance

Page 108: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

FRCC-VCC 1360 Barren 0.02 Acres Operation DisturbanceFRCC-VCC 1360 Urban 4.81 Acres Construction DisturbanceFRCC-VCC 1360 Urban 1.04 Acres Operation DisturbanceFRCC-VCC 1360 Vegetation Condition Class I 5.95 Acres Construction DisturbanceFRCC-VCC 1360 Vegetation Condition Class I 1.40 Acres Operation DisturbanceFRCC-VCC 1360 Vegetation Condition Class II 132.23 Acres Construction DisturbanceFRCC-VCC 1360 Vegetation Condition Class II 27.48 Acres Operation DisturbanceFRCC-VCC 1360 Vegetation Condition Class III 228.56 Acres Construction DisturbanceFRCC-VCC 1360 Vegetation Condition Class III 55.70 Acres Operation DisturbanceFRCC-VCC 1430 Barren 15.00 Acres Construction DisturbanceFRCC-VCC 1430 Barren 3.02 Acres Operation DisturbanceFRCC-VCC 1430 Sparsely Vegetated 1.06 Acres Construction DisturbanceFRCC-VCC 1430 Sparsely Vegetated 0.21 Acres Operation DisturbanceFRCC-VCC 1430 Urban 0.84 Acres Construction DisturbanceFRCC-VCC 1430 Urban 0.17 Acres Operation DisturbanceFRCC-VCC 1430 Vegetation Condition Class I 73.47 Acres Construction DisturbanceFRCC-VCC 1430 Vegetation Condition Class I 14.72 Acres Operation DisturbanceFRCC-VCC 1430 Vegetation Condition Class II 0.18 Acres Construction DisturbanceFRCC-VCC 1430 Vegetation Condition Class II 0.04 Acres Operation DisturbanceFRCC-VCC 1430 Vegetation Condition Class III 131.30 Acres Construction DisturbanceFRCC-VCC 1430 Vegetation Condition Class III 26.39 Acres Operation DisturbanceFRCC-VCC 1430 Water 0.29 Acres Construction DisturbanceFRCC-VCC 1430 Water 0.06 Acres Operation DisturbanceGSG HABITAT 1030 WY-Core-Greater South Pass 195.72 Acres Construction DisturbanceGSG HABITAT 1030 WY-Core-Greater South Pass 32.60 Acres Operation DisturbanceGSG HABITAT 1030 WY-Core-South Rawlins 0.30 Acres Construction DisturbanceGSG HABITAT 1030 WY-Core-South Rawlins 0.13 Acres Operation DisturbanceGSG HABITAT 1040 WY-Core-Greater South Pass 8.15 Acres Construction DisturbanceGSG HABITAT 1040 WY-Core-Greater South Pass 1.56 Acres Operation DisturbanceGSG HABITAT 1100 CO-PGH 42.14 Acres Construction DisturbanceGSG HABITAT 1100 CO-PGH 10.21 Acres Operation DisturbanceGSG HABITAT 1100 CO-PPH 118.52 Acres Construction DisturbanceGSG HABITAT 1100 CO-PPH 24.84 Acres Operation DisturbanceGSG HABITAT 1101 CO-PPH 16.14 Acres Construction DisturbanceGSG HABITAT 1101 CO-PPH 2.37 Acres Operation DisturbanceGSG HABITAT 1103 CO-PGH 14.74 Acres Construction DisturbanceGSG HABITAT 1103 CO-PGH 2.44 Acres Operation DisturbanceGSG HABITAT 1103 CO-PPH 33.76 Acres Construction DisturbanceGSG HABITAT 1103 CO-PPH 5.31 Acres Operation DisturbanceGSG HABITAT 1104 CO-PGH 48.70 Acres Construction DisturbanceGSG HABITAT 1104 CO-PGH 11.60 Acres Operation DisturbanceGSG HABITAT 1104 CO-PPH 8.64 Acres Construction DisturbanceGSG HABITAT 1104 CO-PPH 1.82 Acres Operation DisturbanceGSG HABITAT 1105 CO-PGH 7.51 Acres Construction DisturbanceGSG HABITAT 1105 CO-PGH 1.52 Acres Operation Disturbance

Page 109: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

GSG HABITAT 1105 CO-PPH 10.17 Acres Construction DisturbanceGSG HABITAT 1105 CO-PPH 2.05 Acres Operation DisturbanceGSG HABITAT 1106 CO-PGH 69.33 Acres Construction DisturbanceGSG HABITAT 1106 CO-PGH 14.91 Acres Operation DisturbanceGSG HABITAT 1106 CO-PPH 17.49 Acres Construction DisturbanceGSG HABITAT 1106 CO-PPH 6.10 Acres Operation DisturbanceGSG HABITAT 1187 CO-PGH 345.40 Acres Construction DisturbanceGSG HABITAT 1187 CO-PGH 88.60 Acres Operation DisturbanceGSG HABITAT 1187 CO-PPH 267.19 Acres Construction DisturbanceGSG HABITAT 1187 CO-PPH 74.38 Acres Operation DisturbanceGSG HABITAT 1190 CO-PGH 518.36 Acres Construction DisturbanceGSG HABITAT 1190 CO-PGH 110.63 Acres Operation DisturbanceGSG HABITAT 1190 CO-PPH 785.26 Acres Construction DisturbanceGSG HABITAT 1190 CO-PPH 173.23 Acres Operation DisturbanceGSG HABITAT 1190 WY-Core-Greater South Pass 44.02 Acres Construction DisturbanceGSG HABITAT 1190 WY-Core-Greater South Pass 12.49 Acres Operation DisturbanceGSG HABITAT 1210 CO-PGH 263.89 Acres Construction DisturbanceGSG HABITAT 1210 CO-PGH 48.67 Acres Operation DisturbanceGSG HABITAT 1210 UT-brood-rearing 0.13 Acres Construction DisturbanceGSG HABITAT 1210 UT-brood-rearing 0.04 Acres Operation DisturbanceGSG HABITAT 1210 UT-occupied 0.13 Acres Construction DisturbanceGSG HABITAT 1210 UT-occupied 0.04 Acres Operation DisturbanceGSG HABITAT 1210 UT-Winter 0.13 Acres Construction DisturbanceGSG HABITAT 1210 UT-Winter 0.04 Acres Operation DisturbanceGSG HABITAT 1211 CO-PGH 0.00 Acres Construction DisturbanceGSG HABITAT 1211 CO-PGH 0.00 Acres Operation DisturbanceGSG HABITAT 1211 UT-brood-rearing 25.89 Acres Construction DisturbanceGSG HABITAT 1211 UT-brood-rearing 5.93 Acres Operation DisturbanceGSG HABITAT 1211 UT-occupied 25.89 Acres Construction DisturbanceGSG HABITAT 1211 UT-occupied 5.93 Acres Operation DisturbanceGSG HABITAT 1211 UT-Winter 25.89 Acres Construction DisturbanceGSG HABITAT 1211 UT-Winter 5.93 Acres Operation DisturbanceGSG HABITAT 1214 CO-PGH 0.75 Acres Construction DisturbanceGSG HABITAT 1214 CO-PGH 0.16 Acres Operation DisturbanceGSG HABITAT 1214 UT-brood-rearing 41.99 Acres Construction DisturbanceGSG HABITAT 1214 UT-brood-rearing 9.99 Acres Operation DisturbanceGSG HABITAT 1214 UT-occupied 41.99 Acres Construction DisturbanceGSG HABITAT 1214 UT-occupied 9.99 Acres Operation DisturbanceGSG HABITAT 1214 UT-Winter 41.99 Acres Construction DisturbanceGSG HABITAT 1214 UT-Winter 9.99 Acres Operation DisturbanceGSG HABITAT 1215 UT-brood-rearing 77.72 Acres Construction DisturbanceGSG HABITAT 1215 UT-brood-rearing 16.83 Acres Operation DisturbanceGSG HABITAT 1215 UT-occupied 77.72 Acres Construction DisturbanceGSG HABITAT 1215 UT-occupied 16.83 Acres Operation DisturbanceGSG HABITAT 1215 UT-Winter 77.72 Acres Construction Disturbance

Page 110: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

GSG HABITAT 1215 UT-Winter 16.83 Acres Operation DisturbanceGSG HABITAT 1215.05 UT-brood-rearing 10.32 Acres Construction DisturbanceGSG HABITAT 1215.05 UT-brood-rearing 2.63 Acres Operation DisturbanceGSG HABITAT 1215.05 UT-occupied 10.32 Acres Construction DisturbanceGSG HABITAT 1215.05 UT-occupied 2.63 Acres Operation DisturbanceGSG HABITAT 1215.05 UT-Winter 10.32 Acres Construction DisturbanceGSG HABITAT 1215.05 UT-Winter 2.63 Acres Operation DisturbanceGSG HABITAT 1217.01 UT-brood-rearing 97.43 Acres Construction DisturbanceGSG HABITAT 1217.01 UT-brood-rearing 25.06 Acres Operation DisturbanceGSG HABITAT 1217.01 UT-occupied 115.25 Acres Construction DisturbanceGSG HABITAT 1217.01 UT-occupied 31.25 Acres Operation DisturbanceGSG HABITAT 1217.01 UT-Winter 115.24 Acres Construction DisturbanceGSG HABITAT 1217.01 UT-Winter 31.25 Acres Operation DisturbanceGSG HABITAT 1217.02 UT-brood-rearing 10.38 Acres Construction DisturbanceGSG HABITAT 1217.02 UT-brood-rearing 3.85 Acres Operation DisturbanceGSG HABITAT 1217.02 UT-occupied 57.16 Acres Construction DisturbanceGSG HABITAT 1217.02 UT-occupied 18.46 Acres Operation DisturbanceGSG HABITAT 1217.02 UT-Winter 10.38 Acres Construction DisturbanceGSG HABITAT 1217.02 UT-Winter 3.85 Acres Operation DisturbanceGSG HABITAT 1217.051 UT-brood-rearing 250.08 Acres Construction DisturbanceGSG HABITAT 1217.051 UT-brood-rearing 63.77 Acres Operation DisturbanceGSG HABITAT 1217.051 UT-occupied 250.08 Acres Construction DisturbanceGSG HABITAT 1217.051 UT-occupied 63.77 Acres Operation DisturbanceGSG HABITAT 1217.051 UT-Winter 250.08 Acres Construction DisturbanceGSG HABITAT 1217.051 UT-Winter 63.77 Acres Operation DisturbanceGSG HABITAT 1217.052 UT-brood-rearing 26.39 Acres Construction DisturbanceGSG HABITAT 1217.052 UT-brood-rearing 8.31 Acres Operation DisturbanceGSG HABITAT 1217.052 UT-occupied 26.39 Acres Construction DisturbanceGSG HABITAT 1217.052 UT-occupied 8.31 Acres Operation DisturbanceGSG HABITAT 1217.052 UT-Winter 26.39 Acres Construction DisturbanceGSG HABITAT 1217.052 UT-Winter 8.31 Acres Operation DisturbanceGSG HABITAT 1217.1 UT-brood-rearing 48.69 Acres Construction DisturbanceGSG HABITAT 1217.1 UT-brood-rearing 14.75 Acres Operation DisturbanceGSG HABITAT 1217.1 UT-occupied 153.45 Acres Construction DisturbanceGSG HABITAT 1217.1 UT-occupied 45.85 Acres Operation DisturbanceGSG HABITAT 1217.1 UT-Winter 48.69 Acres Construction DisturbanceGSG HABITAT 1217.1 UT-Winter 14.75 Acres Operation DisturbanceGSG HABITAT 1217.15 UT-brood-rearing 64.83 Acres Construction DisturbanceGSG HABITAT 1217.15 UT-brood-rearing 20.50 Acres Operation DisturbanceGSG HABITAT 1217.15 UT-occupied 108.00 Acres Construction DisturbanceGSG HABITAT 1217.15 UT-occupied 37.42 Acres Operation DisturbanceGSG HABITAT 1217.15 UT-Winter 0.09 Acres Construction DisturbanceGSG HABITAT 1217.15 UT-Winter 0.06 Acres Operation DisturbanceGSG HABITAT 1219.3 UT-brood-rearing 15.96 Acres Construction DisturbanceGSG HABITAT 1219.3 UT-brood-rearing 3.37 Acres Operation Disturbance

Page 111: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

GSG HABITAT 1219.3 UT-occupied 15.96 Acres Construction DisturbanceGSG HABITAT 1219.3 UT-occupied 3.37 Acres Operation DisturbanceGSG HABITAT 1219.3 UT-Winter 15.96 Acres Construction DisturbanceGSG HABITAT 1219.3 UT-Winter 3.37 Acres Operation DisturbanceGSG HABITAT 1219.4 UT-brood-rearing 8.11 Acres Construction DisturbanceGSG HABITAT 1219.4 UT-brood-rearing 4.13 Acres Operation DisturbanceGSG HABITAT 1219.4 UT-occupied 8.11 Acres Construction DisturbanceGSG HABITAT 1219.4 UT-occupied 4.13 Acres Operation DisturbanceGSG HABITAT 1219.4 UT-Winter 8.11 Acres Construction DisturbanceGSG HABITAT 1219.4 UT-Winter 4.13 Acres Operation DisturbanceGSG HABITAT 1219.45 UT-brood-rearing 10.65 Acres Construction DisturbanceGSG HABITAT 1219.45 UT-brood-rearing 3.55 Acres Operation DisturbanceGSG HABITAT 1219.45 UT-occupied 10.65 Acres Construction DisturbanceGSG HABITAT 1219.45 UT-occupied 3.55 Acres Operation DisturbanceGSG HABITAT 1219.45 UT-Winter 10.65 Acres Construction DisturbanceGSG HABITAT 1219.45 UT-Winter 3.55 Acres Operation DisturbanceGSG HABITAT 1219.5 UT-brood-rearing 10.30 Acres Construction DisturbanceGSG HABITAT 1219.5 UT-brood-rearing 4.90 Acres Operation DisturbanceGSG HABITAT 1219.5 UT-occupied 10.30 Acres Construction DisturbanceGSG HABITAT 1219.5 UT-occupied 4.90 Acres Operation DisturbanceGSG HABITAT 1219.5 UT-Winter 10.30 Acres Construction DisturbanceGSG HABITAT 1219.5 UT-Winter 4.90 Acres Operation DisturbanceGSG HABITAT 1219.6 UT-brood-rearing 1.54 Acres Construction DisturbanceGSG HABITAT 1219.6 UT-brood-rearing 0.30 Acres Operation DisturbanceGSG HABITAT 1219.6 UT-occupied 1.54 Acres Construction DisturbanceGSG HABITAT 1219.6 UT-occupied 0.30 Acres Operation DisturbanceGSG HABITAT 1219.6 UT-Winter 1.54 Acres Construction DisturbanceGSG HABITAT 1219.6 UT-Winter 0.30 Acres Operation DisturbanceGSG HABITAT 1220 CO-PGH 273.38 Acres Construction DisturbanceGSG HABITAT 1220 CO-PGH 57.39 Acres Operation DisturbanceGSG HABITAT 1223 UT-occupied 200.84 Acres Construction DisturbanceGSG HABITAT 1223 UT-occupied 43.75 Acres Operation DisturbanceGSG HABITAT 1310 UT-brood-rearing 142.08 Acres Construction DisturbanceGSG HABITAT 1310 UT-brood-rearing 38.80 Acres Operation DisturbanceGSG HABITAT 1310 UT-occupied 203.66 Acres Construction DisturbanceGSG HABITAT 1310 UT-occupied 66.09 Acres Operation DisturbanceGSG HABITAT 1310 UT-Winter 101.00 Acres Construction DisturbanceGSG HABITAT 1310 UT-Winter 27.80 Acres Operation DisturbanceGSG HABITAT 1320.05 UT-brood-rearing 161.21 Acres Construction DisturbanceGSG HABITAT 1320.05 UT-brood-rearing 27.42 Acres Operation DisturbanceGSG HABITAT 1320.05 UT-occupied 161.21 Acres Construction DisturbanceGSG HABITAT 1320.05 UT-occupied 27.42 Acres Operation DisturbanceGSG HABITAT 1320.05 UT-Winter 62.00 Acres Construction DisturbanceGSG HABITAT 1320.05 UT-Winter 10.64 Acres Operation DisturbanceGSG HABITAT 1320.15 UT-occupied 9.62 Acres Construction Disturbance

Page 112: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

GSG HABITAT 1320.15 UT-occupied 6.82 Acres Operation DisturbanceGSG HABITAT 1320.2 UT-occupied 0.37 Acres Construction DisturbanceGSG HABITAT 1320.2 UT-occupied 0.26 Acres Operation DisturbanceGSG HABITAT 1321.01 UT-brood-rearing 110.07 Acres Construction DisturbanceGSG HABITAT 1321.01 UT-brood-rearing 20.62 Acres Operation DisturbanceGSG HABITAT 1321.01 UT-occupied 110.35 Acres Construction DisturbanceGSG HABITAT 1321.01 UT-occupied 20.70 Acres Operation DisturbanceGSG HABITAT 1321.01 UT-Winter 51.67 Acres Construction DisturbanceGSG HABITAT 1321.01 UT-Winter 8.99 Acres Operation DisturbanceGSG HABITAT 1321.02 UT-brood-rearing 13.50 Acres Construction DisturbanceGSG HABITAT 1321.02 UT-brood-rearing 1.06 Acres Operation DisturbanceGSG HABITAT 1321.02 UT-occupied 13.50 Acres Construction DisturbanceGSG HABITAT 1321.02 UT-occupied 1.06 Acres Operation DisturbanceGSG HABITAT 1321.02 UT-Winter 13.50 Acres Construction DisturbanceGSG HABITAT 1321.02 UT-Winter 1.06 Acres Operation DisturbanceGSG HABITAT 1322.01 UT-brood-rearing 18.04 Acres Construction DisturbanceGSG HABITAT 1322.01 UT-brood-rearing 2.37 Acres Operation DisturbanceGSG HABITAT 1322.01 UT-occupied 18.04 Acres Construction DisturbanceGSG HABITAT 1322.01 UT-occupied 2.37 Acres Operation DisturbanceGSG HABITAT 1322.01 UT-Winter 18.04 Acres Construction DisturbanceGSG HABITAT 1322.01 UT-Winter 2.37 Acres Operation DisturbanceGSG HABITAT 1322.02 UT-brood-rearing 58.27 Acres Construction DisturbanceGSG HABITAT 1322.02 UT-brood-rearing 12.24 Acres Operation DisturbanceGSG HABITAT 1322.02 UT-occupied 58.27 Acres Construction DisturbanceGSG HABITAT 1322.02 UT-occupied 12.24 Acres Operation DisturbanceGSG HABITAT 1322.02 UT-Winter 58.27 Acres Construction DisturbanceGSG HABITAT 1322.02 UT-Winter 12.24 Acres Operation DisturbanceGSG HABITAT 1322.11 UT-brood-rearing 41.97 Acres Construction DisturbanceGSG HABITAT 1322.11 UT-brood-rearing 6.48 Acres Operation DisturbanceGSG HABITAT 1322.11 UT-occupied 41.97 Acres Construction DisturbanceGSG HABITAT 1322.11 UT-occupied 6.48 Acres Operation DisturbanceGSG HABITAT 1322.11 UT-Winter 41.97 Acres Construction DisturbanceGSG HABITAT 1322.11 UT-Winter 6.48 Acres Operation DisturbanceGSG HABITAT 1322.12 UT-brood-rearing 25.86 Acres Construction DisturbanceGSG HABITAT 1322.12 UT-brood-rearing 3.52 Acres Operation DisturbanceGSG HABITAT 1322.12 UT-occupied 25.86 Acres Construction DisturbanceGSG HABITAT 1322.12 UT-occupied 3.52 Acres Operation DisturbanceGSG HABITAT 1322.12 UT-Winter 25.86 Acres Construction DisturbanceGSG HABITAT 1322.12 UT-Winter 3.52 Acres Operation DisturbanceGSG HABITAT 1322.21 UT-brood-rearing 16.75 Acres Construction DisturbanceGSG HABITAT 1322.21 UT-brood-rearing 4.12 Acres Operation DisturbanceGSG HABITAT 1322.21 UT-occupied 16.75 Acres Construction DisturbanceGSG HABITAT 1322.21 UT-occupied 4.12 Acres Operation DisturbanceGSG HABITAT 1322.21 UT-Winter 16.75 Acres Construction DisturbanceGSG HABITAT 1322.21 UT-Winter 4.12 Acres Operation Disturbance

Page 113: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

GSG HABITAT 1322.22 UT-brood-rearing 52.83 Acres Construction DisturbanceGSG HABITAT 1322.22 UT-brood-rearing 7.16 Acres Operation DisturbanceGSG HABITAT 1322.22 UT-occupied 52.83 Acres Construction DisturbanceGSG HABITAT 1322.22 UT-occupied 7.16 Acres Operation DisturbanceGSG HABITAT 1322.22 UT-Winter 52.23 Acres Construction DisturbanceGSG HABITAT 1322.22 UT-Winter 7.08 Acres Operation DisturbanceGSG HABITAT 1322.23 UT-brood-rearing 1.80 Acres Construction DisturbanceGSG HABITAT 1322.23 UT-brood-rearing 1.12 Acres Operation DisturbanceGSG HABITAT 1322.23 UT-occupied 1.80 Acres Construction DisturbanceGSG HABITAT 1322.23 UT-occupied 1.12 Acres Operation DisturbanceGSG HABITAT 1322.23 UT-Winter 1.80 Acres Construction DisturbanceGSG HABITAT 1322.23 UT-Winter 1.12 Acres Operation DisturbanceGSG HABITAT 1322.51 UT-brood-rearing 57.81 Acres Construction DisturbanceGSG HABITAT 1322.51 UT-brood-rearing 9.48 Acres Operation DisturbanceGSG HABITAT 1322.51 UT-occupied 57.81 Acres Construction DisturbanceGSG HABITAT 1322.51 UT-occupied 9.48 Acres Operation DisturbanceGSG HABITAT 1322.51 UT-Winter 57.81 Acres Construction DisturbanceGSG HABITAT 1322.51 UT-Winter 9.48 Acres Operation DisturbanceGSG HABITAT 1322.52 UT-brood-rearing 11.14 Acres Construction DisturbanceGSG HABITAT 1322.52 UT-brood-rearing 2.34 Acres Operation DisturbanceGSG HABITAT 1322.52 UT-occupied 11.14 Acres Construction DisturbanceGSG HABITAT 1322.52 UT-occupied 2.34 Acres Operation DisturbanceGSG HABITAT 1322.52 UT-Winter 11.14 Acres Construction DisturbanceGSG HABITAT 1322.52 UT-Winter 2.34 Acres Operation DisturbanceGSG HABITAT 1322.53 UT-brood-rearing 25.26 Acres Construction DisturbanceGSG HABITAT 1322.53 UT-brood-rearing 6.72 Acres Operation DisturbanceGSG HABITAT 1322.53 UT-occupied 25.26 Acres Construction DisturbanceGSG HABITAT 1322.53 UT-occupied 6.72 Acres Operation DisturbanceGSG HABITAT 1322.53 UT-Winter 25.26 Acres Construction DisturbanceGSG HABITAT 1322.53 UT-Winter 6.72 Acres Operation DisturbanceGSG HABITAT 1322.71 UT-brood-rearing 30.45 Acres Construction DisturbanceGSG HABITAT 1322.71 UT-brood-rearing 8.57 Acres Operation DisturbanceGSG HABITAT 1322.71 UT-occupied 30.45 Acres Construction DisturbanceGSG HABITAT 1322.71 UT-occupied 8.57 Acres Operation DisturbanceGSG HABITAT 1322.71 UT-Winter 30.45 Acres Construction DisturbanceGSG HABITAT 1322.71 UT-Winter 8.57 Acres Operation DisturbanceGSG HABITAT 1323.01 UT-brood-rearing 82.39 Acres Construction DisturbanceGSG HABITAT 1323.01 UT-brood-rearing 21.31 Acres Operation DisturbanceGSG HABITAT 1323.01 UT-occupied 82.39 Acres Construction DisturbanceGSG HABITAT 1323.01 UT-occupied 21.31 Acres Operation DisturbanceGSG HABITAT 1323.01 UT-Winter 80.36 Acres Construction DisturbanceGSG HABITAT 1323.01 UT-Winter 20.76 Acres Operation DisturbanceGSG HABITAT 1323.02 UT-brood-rearing 115.29 Acres Construction DisturbanceGSG HABITAT 1323.02 UT-brood-rearing 41.02 Acres Operation DisturbanceGSG HABITAT 1323.02 UT-occupied 115.29 Acres Construction Disturbance

Page 114: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

GSG HABITAT 1323.02 UT-occupied 41.02 Acres Operation DisturbanceGSG HABITAT 1323.02 UT-Winter 104.08 Acres Construction DisturbanceGSG HABITAT 1323.02 UT-Winter 37.79 Acres Operation DisturbanceGSG HABITAT 1325.1 UT-brood-rearing 13.02 Acres Construction DisturbanceGSG HABITAT 1325.1 UT-brood-rearing 5.94 Acres Operation DisturbanceGSG HABITAT 1325.1 UT-occupied 151.52 Acres Construction DisturbanceGSG HABITAT 1325.1 UT-occupied 42.25 Acres Operation DisturbanceGSG HABITAT 1325.1 UT-Winter 138.49 Acres Construction DisturbanceGSG HABITAT 1325.1 UT-Winter 36.31 Acres Operation DisturbanceGSG HABITAT 1330.1 UT-occupied 18.70 Acres Construction DisturbanceGSG HABITAT 1330.1 UT-occupied 3.71 Acres Operation DisturbanceGSG HABITAT 1340 UT-brood-rearing 16.69 Acres Construction DisturbanceGSG HABITAT 1340 UT-brood-rearing 6.14 Acres Operation DisturbanceGSG HABITAT 1340 UT-occupied 16.69 Acres Construction DisturbanceGSG HABITAT 1340 UT-occupied 6.14 Acres Operation DisturbanceGSG HABITAT 1340 UT-Winter 16.69 Acres Construction DisturbanceGSG HABITAT 1340 UT-Winter 6.14 Acres Operation DisturbanceGSG HABITAT 1350 UT-brood-rearing 11.58 Acres Construction DisturbanceGSG HABITAT 1350 UT-brood-rearing 3.17 Acres Operation DisturbanceGSG HABITAT 1350 UT-occupied 11.58 Acres Construction DisturbanceGSG HABITAT 1350 UT-occupied 3.17 Acres Operation DisturbanceGSG HABITAT 1350 UT-Winter 11.58 Acres Construction DisturbanceGSG HABITAT 1350 UT-Winter 3.17 Acres Operation DisturbanceGSG HABITAT 1360 UT-brood-rearing 294.29 Acres Construction DisturbanceGSG HABITAT 1360 UT-brood-rearing 64.36 Acres Operation DisturbanceGSG HABITAT 1360 UT-occupied 312.80 Acres Construction DisturbanceGSG HABITAT 1360 UT-occupied 68.70 Acres Operation DisturbanceGSG HABITAT 1360 UT-Winter 294.29 Acres Construction DisturbanceGSG HABITAT 1360 UT-Winter 64.36 Acres Operation DisturbanceGSG HABITAT 1370 UT-brood-rearing 49.40 Acres Construction DisturbanceGSG HABITAT 1370 UT-brood-rearing 9.96 Acres Operation DisturbanceGSG HABITAT 1370 UT-occupied 49.40 Acres Construction DisturbanceGSG HABITAT 1370 UT-occupied 9.96 Acres Operation DisturbanceGSG HABITAT 1370 UT-Winter 49.40 Acres Construction DisturbanceGSG HABITAT 1370 UT-Winter 9.96 Acres Operation DisturbanceGSG HABITAT 1500 UT-brood-rearing 89.98 Acres Construction DisturbanceGSG HABITAT 1500 UT-brood-rearing 16.98 Acres Operation DisturbanceGSG HABITAT 1500 UT-occupied 90.03 Acres Construction DisturbanceGSG HABITAT 1500 UT-occupied 16.98 Acres Operation DisturbanceGSG HABITAT 1500 UT-Winter 89.95 Acres Construction DisturbanceGSG HABITAT 1500 UT-Winter 16.95 Acres Operation DisturbanceGSG PAC 1030 PAC-WY 144.48 Acres Construction DisturbanceGSG PAC 1030 PAC-WY 28.91 Acres Operation DisturbanceGSG PAC 1040 PAC-WY 2.31 Acres Construction DisturbanceGSG PAC 1040 PAC-WY 0.48 Acres Operation Disturbance

Page 115: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

GSG PAC 1100 PAC-CO 118.52 Acres Construction DisturbanceGSG PAC 1100 PAC-CO 24.84 Acres Operation DisturbanceGSG PAC 1101 PAC-CO 16.14 Acres Construction DisturbanceGSG PAC 1101 PAC-CO 2.37 Acres Operation DisturbanceGSG PAC 1103 PAC-CO 33.76 Acres Construction DisturbanceGSG PAC 1103 PAC-CO 5.31 Acres Operation DisturbanceGSG PAC 1104 PAC-CO 8.64 Acres Construction DisturbanceGSG PAC 1104 PAC-CO 1.82 Acres Operation DisturbanceGSG PAC 1105 PAC-CO 10.17 Acres Construction DisturbanceGSG PAC 1105 PAC-CO 2.05 Acres Operation DisturbanceGSG PAC 1106 PAC-CO 17.49 Acres Construction DisturbanceGSG PAC 1106 PAC-CO 6.10 Acres Operation DisturbanceGSG PAC 1110 PAC-WY 5.72 Acres Construction DisturbanceGSG PAC 1110 PAC-WY 1.01 Acres Operation DisturbanceGSG PAC 1187 PAC-CO 260.42 Acres Construction DisturbanceGSG PAC 1187 PAC-CO 73.08 Acres Operation DisturbanceGSG PAC 1190 PAC-CO 785.38 Acres Construction DisturbanceGSG PAC 1190 PAC-CO 173.26 Acres Operation DisturbanceGSG PAC 1190 PAC-WY 43.87 Acres Construction DisturbanceGSG PAC 1190 PAC-WY 12.47 Acres Operation DisturbanceGSG PAC 1217.02 PAC-UT 244.26 Acres Construction DisturbanceGSG PAC 1217.02 PAC-UT 74.73 Acres Operation DisturbanceGSG PAC 1217.051 PAC-UT 268.53 Acres Construction DisturbanceGSG PAC 1217.051 PAC-UT 69.23 Acres Operation DisturbanceGSG PAC 1217.052 PAC-UT 27.72 Acres Construction DisturbanceGSG PAC 1217.052 PAC-UT 8.80 Acres Operation DisturbanceGSG PAC 1217.1 PAC-UT 122.19 Acres Construction DisturbanceGSG PAC 1217.1 PAC-UT 34.49 Acres Operation DisturbanceGSG PAC 1217.15 PAC-UT 346.19 Acres Construction DisturbanceGSG PAC 1217.15 PAC-UT 113.33 Acres Operation DisturbanceGSG PAC 1219.2 PAC-UT 22.55 Acres Construction DisturbanceGSG PAC 1219.2 PAC-UT 6.29 Acres Operation DisturbanceGSG PAC 1219.3 PAC-UT 16.81 Acres Construction DisturbanceGSG PAC 1219.3 PAC-UT 3.55 Acres Operation DisturbanceGSG PAC 1219.4 PAC-UT 16.13 Acres Construction DisturbanceGSG PAC 1219.4 PAC-UT 7.47 Acres Operation DisturbanceGSG PAC 1219.45 PAC-UT 33.42 Acres Construction DisturbanceGSG PAC 1219.45 PAC-UT 12.74 Acres Operation DisturbanceGSG PAC 1219.5 PAC-UT 80.36 Acres Construction DisturbanceGSG PAC 1219.5 PAC-UT 28.88 Acres Operation DisturbanceGSG PAC 1219.6 PAC-UT 4.71 Acres Construction DisturbanceGSG PAC 1219.6 PAC-UT 1.03 Acres Operation DisturbanceGSG PAC 1223 PAC-UT 204.81 Acres Construction DisturbanceGSG PAC 1223 PAC-UT 45.72 Acres Operation DisturbanceGSG PAC 1310 PAC-UT 112.48 Acres Construction Disturbance

Page 116: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

GSG PAC 1310 PAC-UT 30.81 Acres Operation DisturbanceGSG PAC 1321.01 PAC-UT 4.64 Acres Construction DisturbanceGSG PAC 1321.01 PAC-UT 0.39 Acres Operation DisturbanceGSG PAC 1321.02 PAC-UT 15.76 Acres Construction DisturbanceGSG PAC 1321.02 PAC-UT 1.47 Acres Operation DisturbanceGSG PAC 1322.01 PAC-UT 20.18 Acres Construction DisturbanceGSG PAC 1322.01 PAC-UT 3.04 Acres Operation DisturbanceGSG PAC 1322.02 PAC-UT 57.53 Acres Construction DisturbanceGSG PAC 1322.02 PAC-UT 12.09 Acres Operation DisturbanceGSG PAC 1322.11 PAC-UT 41.97 Acres Construction DisturbanceGSG PAC 1322.11 PAC-UT 6.48 Acres Operation DisturbanceGSG PAC 1322.12 PAC-UT 25.86 Acres Construction DisturbanceGSG PAC 1322.12 PAC-UT 3.52 Acres Operation DisturbanceGSG PAC 1322.21 PAC-UT 23.49 Acres Construction DisturbanceGSG PAC 1322.21 PAC-UT 5.78 Acres Operation DisturbanceGSG PAC 1322.22 PAC-UT 56.46 Acres Construction DisturbanceGSG PAC 1322.22 PAC-UT 7.65 Acres Operation DisturbanceGSG PAC 1322.23 PAC-UT 28.73 Acres Construction DisturbanceGSG PAC 1322.23 PAC-UT 5.45 Acres Operation DisturbanceGSG PAC 1322.51 PAC-UT 48.03 Acres Construction DisturbanceGSG PAC 1322.51 PAC-UT 7.87 Acres Operation DisturbanceGSG PAC 1322.52 PAC-UT 11.14 Acres Construction DisturbanceGSG PAC 1322.52 PAC-UT 2.34 Acres Operation DisturbanceGSG PAC 1322.53 PAC-UT 25.26 Acres Construction DisturbanceGSG PAC 1322.53 PAC-UT 6.72 Acres Operation DisturbanceGSG PAC 1322.71 PAC-UT 130.32 Acres Construction DisturbanceGSG PAC 1322.71 PAC-UT 36.51 Acres Operation DisturbanceGSG PAC 1323.01 PAC-UT 93.74 Acres Construction DisturbanceGSG PAC 1323.01 PAC-UT 24.28 Acres Operation DisturbanceGSG PAC 1323.02 PAC-UT 242.48 Acres Construction DisturbanceGSG PAC 1323.02 PAC-UT 83.07 Acres Operation DisturbanceGSG PAC 1324 PAC-UT 72.91 Acres Construction DisturbanceGSG PAC 1324 PAC-UT 28.92 Acres Operation DisturbanceGSG PAC 1325.2 PAC-UT 24.62 Acres Construction DisturbanceGSG PAC 1325.2 PAC-UT 8.84 Acres Operation DisturbanceGSG PAC 1330.1 PAC-UT 75.30 Acres Construction DisturbanceGSG PAC 1330.1 PAC-UT 18.49 Acres Operation DisturbanceGSG PAC 1500 PAC-UT 90.03 Acres Construction DisturbanceGSG PAC 1500 PAC-UT 16.98 Acres Operation DisturbanceHMA 1115 Adobe Town (WY009) 55.15 Acres Construction DisturbanceHMA 1115 Adobe Town (WY009) 10.59 Acres Operation DisturbanceHMA 1120 Adobe Town (WY009) 264.46 Acres Construction DisturbanceHMA 1120 Adobe Town (WY009) 54.87 Acres Operation DisturbanceHMA 1120.1 Adobe Town (WY009) 3.19 Acres Construction DisturbanceHMA 1120.1 Adobe Town (WY009) 1.26 Acres Operation Disturbance

Page 117: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

HMA 1120.2 Adobe Town (WY009) 3.13 Acres Construction DisturbanceHMA 1120.2 Adobe Town (WY009) 0.57 Acres Operation DisturbanceHMA 1187 Sand Wash (CO143) 14.71 Acres Construction DisturbanceHMA 1187 Sand Wash (CO143) 6.32 Acres Operation DisturbanceHMA 1217.01 HILL CREEK (UT852) 0.55 Acres Construction DisturbanceHMA 1217.01 HILL CREEK (UT852) 0.26 Acres Operation DisturbanceHMA 1220 North Piceance (CO163) 178.56 Acres Construction DisturbanceHMA 1220 North Piceance (CO163) 35.35 Acres Operation DisturbanceHMA 1220 Piceance-East Douglas (CO161) 23.51 Acres Construction DisturbanceHMA 1220 Piceance-East Douglas (CO161) 4.84 Acres Operation DisturbanceHMA 1220 West Douglas (CO162) 220.00 Acres Construction DisturbanceHMA 1220 West Douglas (CO162) 49.09 Acres Operation DisturbanceHMA 1490.05 Eagle (NV0414) 0.14 Acres Construction DisturbanceHMA 1490.05 Eagle (NV0414) 0.03 Acres Operation DisturbanceHMA 1490.05 NORTH HILLS (UT447) 5.42 Acres Construction DisturbanceHMA 1490.05 NORTH HILLS (UT447) 1.12 Acres Operation DisturbanceHMA 1500.02 CHOLRIDE CANYON (UT442) 75.61 Acres Construction DisturbanceHMA 1500.02 CHOLRIDE CANYON (UT442) 10.09 Acres Operation DisturbanceHMA 1506 CHOLRIDE CANYON (UT442) 0.07 Acres Construction DisturbanceHMA 1506 CHOLRIDE CANYON (UT442) 0.03 Acres Operation DisturbanceHMA 1510 NORTH HILLS (UT447) 0.63 Acres Construction DisturbanceHMA 1510 NORTH HILLS (UT447) 0.26 Acres Operation DisturbanceIBA 1115 10 - Muddy Creek Wetlands 26.10 Acres Construction DisturbanceIBA 1115 10 - Muddy Creek Wetlands 5.10 Acres Operation DisturbanceIBA 1115 14 - Powder Rim 45.52 Acres Construction DisturbanceIBA 1115 14 - Powder Rim 8.66 Acres Operation DisturbanceIBA 1116 14 - Powder Rim 105.09 Acres Construction DisturbanceIBA 1116 14 - Powder Rim 20.39 Acres Operation DisturbanceIBA 1120 14 - Powder Rim 33.14 Acres Construction DisturbanceIBA 1120 14 - Powder Rim 6.84 Acres Operation DisturbanceIBA 1120.1 14 - Powder Rim 34.98 Acres Construction DisturbanceIBA 1120.1 14 - Powder Rim 10.06 Acres Operation DisturbanceIBA 1120.2 14 - Powder Rim 47.42 Acres Construction DisturbanceIBA 1120.2 14 - Powder Rim 7.88 Acres Operation DisturbanceIBA 1180 14 - Powder Rim 64.31 Acres Construction DisturbanceIBA 1180 14 - Powder Rim 12.99 Acres Operation DisturbanceIBA 1187 14 - Powder Rim 14.37 Acres Construction DisturbanceIBA 1187 14 - Powder Rim 3.11 Acres Operation DisturbanceIBA 1190 10 - Muddy Creek Wetlands 9.07 Acres Construction DisturbanceIBA 1190 10 - Muddy Creek Wetlands 3.55 Acres Operation DisturbanceIBA 1323 19 - Upper Strawberry Watershed UT12 3.03 Acres Construction DisturbanceIBA 1323 19 - Upper Strawberry Watershed UT12 1.07 Acres Operation DisturbanceIBA 1323.02 19 - Upper Strawberry Watershed UT12 2.88 Acres Construction DisturbanceIBA 1323.02 19 - Upper Strawberry Watershed UT12 1.07 Acres Operation DisturbanceIBA 1324 19 - Upper Strawberry Watershed UT12 16.14 Acres Construction Disturbance

Page 118: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

IBA 1324 19 - Upper Strawberry Watershed UT12 16.14 Acres Construction DisturbanceIBA 1324 19 - Upper Strawberry Watershed UT12 5.40 Acres Operation DisturbanceIBA 1324 19 - Upper Strawberry Watershed UT12 5.40 Acres Operation DisturbanceIBA 1324.2 19 - Upper Strawberry Watershed UT12 17.96 Acres Construction DisturbanceIBA 1324.2 19 - Upper Strawberry Watershed UT12 5.47 Acres Operation DisturbanceIBA 1324.4 19 - Upper Strawberry Watershed UT12 22.35 Acres Construction DisturbanceIBA 1324.4 19 - Upper Strawberry Watershed UT12 5.53 Acres Operation DisturbanceIBA 1325 19 - Upper Strawberry Watershed UT12 0.11 Acres Construction DisturbanceIBA 1325 19 - Upper Strawberry Watershed UT12 0.11 Acres Construction DisturbanceIBA 1325 19 - Upper Strawberry Watershed UT12 0.08 Acres Operation DisturbanceIBA 1325 19 - Upper Strawberry Watershed UT12 0.08 Acres Operation DisturbanceIBA 1520 12 - Pahranagat Valley Complex 6.06 Acres Construction DisturbanceIBA 1520 12 - Pahranagat Valley Complex 0.88 Acres Operation DisturbanceIBA 1670 5 - Lake Mead NRA 0.17 Acres Construction DisturbanceIBA 1670 5 - Lake Mead NRA 0.07 Acres Operation DisturbanceIBA 1710 5 - Lake Mead NRA 3.49 Acres Construction DisturbanceIBA 1710 5 - Lake Mead NRA 1.84 Acres Operation DisturbanceLandscape Scenery 1030 Low 32.24 Miles Amount CrossedLandscape Scenery 1040 Low 9.18 Miles Amount CrossedLandscape Scenery 1100 High 2.02 Miles Amount CrossedLandscape Scenery 1100 Moderate 12.62 Miles Amount CrossedLandscape Scenery 1101 Moderate 0.80 Miles Amount CrossedLandscape Scenery 1103 Moderate 2.88 Miles Amount CrossedLandscape Scenery 1104 High 0.26 Miles Amount CrossedLandscape Scenery 1104 Moderate 3.68 Miles Amount CrossedLandscape Scenery 1105 High 2.19 Miles Amount CrossedLandscape Scenery 1105 Moderate 2.60 Miles Amount CrossedLandscape Scenery 1106 Low 5.66 Miles Amount CrossedLandscape Scenery 1110 Low 6.96 Miles Amount CrossedLandscape Scenery 1115 High 10.49 Miles Amount CrossedLandscape Scenery 1115 Low 17.73 Miles Amount CrossedLandscape Scenery 1115 Moderate 17.65 Miles Amount CrossedLandscape Scenery 1116 High 7.38 Miles Amount CrossedLandscape Scenery 1116 Moderate 0.02 Miles Amount CrossedLandscape Scenery 1120 High 8.34 Miles Amount CrossedLandscape Scenery 1120 Low 13.23 Miles Amount CrossedLandscape Scenery 1120 Moderate 11.10 Miles Amount CrossedLandscape Scenery 1120.1 Moderate 2.05 Miles Amount CrossedLandscape Scenery 1120.2 High 0.14 Miles Amount CrossedLandscape Scenery 1120.2 Moderate 2.89 Miles Amount CrossedLandscape Scenery 1180 High 4.43 Miles Amount CrossedLandscape Scenery 1187 High 30.31 Miles Amount CrossedLandscape Scenery 1187 Moderate 15.05 Miles Amount CrossedLandscape Scenery 1190 High 41.92 Miles Amount CrossedLandscape Scenery 1190 Low 55.71 Miles Amount Crossed

Page 119: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

Landscape Scenery 1190 Moderate 35.93 Miles Amount CrossedLandscape Scenery 1210 Low 20.61 Miles Amount CrossedLandscape Scenery 1210 Moderate 4.11 Miles Amount CrossedLandscape Scenery 1211 High 8.17 Miles Amount CrossedLandscape Scenery 1211 Moderate 0.01 Miles Amount CrossedLandscape Scenery 1212 Low 13.75 Miles Amount CrossedLandscape Scenery 1214 High 8.90 Miles Amount CrossedLandscape Scenery 1214 Moderate 1.03 Miles Amount CrossedLandscape Scenery 1215 Low 7.37 Miles Amount CrossedLandscape Scenery 1215.05 Low 9.58 Miles Amount CrossedLandscape Scenery 1217.01 High 26.76 Miles Amount CrossedLandscape Scenery 1217.01 Low 35.48 Miles Amount CrossedLandscape Scenery 1217.01 Moderate 14.59 Miles Amount CrossedLandscape Scenery 1217.02 High 14.69 Miles Amount CrossedLandscape Scenery 1217.02 Moderate 1.34 Miles Amount CrossedLandscape Scenery 1217.051 High 11.48 Miles Amount CrossedLandscape Scenery 1217.051 Moderate 8.99 Miles Amount CrossedLandscape Scenery 1217.052 High 13.37 Miles Amount CrossedLandscape Scenery 1217.052 Moderate 2.45 Miles Amount CrossedLandscape Scenery 1217.1 High 6.68 Miles Amount CrossedLandscape Scenery 1217.1 Low 3.97 Miles Amount CrossedLandscape Scenery 1217.1 Moderate 10.22 Miles Amount CrossedLandscape Scenery 1217.15 High 25.68 Miles Amount CrossedLandscape Scenery 1217.15 Low 1.64 Miles Amount CrossedLandscape Scenery 1217.15 Moderate 9.05 Miles Amount CrossedLandscape Scenery 1218 High 11.97 Miles Amount CrossedLandscape Scenery 1219.1 High 0.60 Miles Amount CrossedLandscape Scenery 1219.2 High 19.59 Miles Amount CrossedLandscape Scenery 1219.2 Moderate 0.20 Miles Amount CrossedLandscape Scenery 1219.3 Moderate 1.47 Miles Amount CrossedLandscape Scenery 1219.4 High 0.94 Miles Amount CrossedLandscape Scenery 1219.45 High 1.60 Miles Amount CrossedLandscape Scenery 1219.5 High 16.50 Miles Amount CrossedLandscape Scenery 1219.5 Moderate 0.32 Miles Amount CrossedLandscape Scenery 1219.6 High 4.56 Miles Amount CrossedLandscape Scenery 1220 High 56.20 Miles Amount CrossedLandscape Scenery 1220 Low 70.47 Miles Amount CrossedLandscape Scenery 1220 Moderate 53.64 Miles Amount CrossedLandscape Scenery 1222.05 High 5.57 Miles Amount CrossedLandscape Scenery 1222.05 Low 12.56 Miles Amount CrossedLandscape Scenery 1222.05 Moderate 23.04 Miles Amount CrossedLandscape Scenery 1222.3 Low 14.18 Miles Amount CrossedLandscape Scenery 1223 Low 18.16 Miles Amount CrossedLandscape Scenery 1225.2 High 11.92 Miles Amount CrossedLandscape Scenery 1225.2 Low 10.51 Miles Amount Crossed

Page 120: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

Landscape Scenery 1225.2 Moderate 15.98 Miles Amount CrossedLandscape Scenery 1270 Low 10.77 Miles Amount CrossedLandscape Scenery 1310 High 29.10 Miles Amount CrossedLandscape Scenery 1310 Moderate 21.16 Miles Amount CrossedLandscape Scenery 1320.05 High 7.83 Miles Amount CrossedLandscape Scenery 1320.05 Low 26.64 Miles Amount CrossedLandscape Scenery 1320.05 Moderate 2.98 Miles Amount CrossedLandscape Scenery 1320.15 High 26.63 Miles Amount CrossedLandscape Scenery 1320.15 Moderate 1.35 Miles Amount CrossedLandscape Scenery 1320.2 High 5.99 Miles Amount CrossedLandscape Scenery 1320.2 Moderate 0.40 Miles Amount CrossedLandscape Scenery 1320.21 High 0.27 Miles Amount CrossedLandscape Scenery 1321 Low 28.88 Miles Amount CrossedLandscape Scenery 1321 Moderate 2.69 Miles Amount CrossedLandscape Scenery 1322 High 1.71 Miles Amount CrossedLandscape Scenery 1322 Low 4.19 Miles Amount CrossedLandscape Scenery 1322 Moderate 1.10 Miles Amount CrossedLandscape Scenery 1322.5 High 7.41 Miles Amount CrossedLandscape Scenery 1323 High 14.14 Miles Amount CrossedLandscape Scenery 1323 Low 1.46 Miles Amount CrossedLandscape Scenery 1323 Moderate 6.04 Miles Amount CrossedLandscape Scenery 1324 High 4.65 Miles Amount CrossedLandscape Scenery 1324.2 High 4.69 Miles Amount CrossedLandscape Scenery 1324.4 High 4.75 Miles Amount CrossedLandscape Scenery 1325 High 7.34 Miles Amount CrossedLandscape Scenery 1325 Moderate 1.75 Miles Amount CrossedLandscape Scenery 1325.1 High 20.68 Miles Amount CrossedLandscape Scenery 1325.1 Low 3.30 Miles Amount CrossedLandscape Scenery 1325.1 Moderate 19.30 Miles Amount CrossedLandscape Scenery 1325.2 High 4.12 Miles Amount CrossedLandscape Scenery 1330.1 High 12.81 Miles Amount CrossedLandscape Scenery 1330.1 Low 51.17 Miles Amount CrossedLandscape Scenery 1330.1 Moderate 34.95 Miles Amount CrossedLandscape Scenery 1340 High 8.07 Miles Amount CrossedLandscape Scenery 1340 Low 10.71 Miles Amount CrossedLandscape Scenery 1340 Moderate 1.22 Miles Amount CrossedLandscape Scenery 1350 High 9.43 Miles Amount CrossedLandscape Scenery 1350 Moderate 5.29 Miles Amount CrossedLandscape Scenery 1360 High 5.08 Miles Amount CrossedLandscape Scenery 1360 Moderate 22.04 Miles Amount CrossedLandscape Scenery 1370 Low 4.50 Miles Amount CrossedLandscape Scenery 1370 Moderate 10.19 Miles Amount CrossedLandscape Scenery 1380 Low 13.22 Miles Amount CrossedLandscape Scenery 1390 Moderate 3.62 Miles Amount CrossedLandscape Scenery 1400 High 9.28 Miles Amount Crossed

Page 121: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

Landscape Scenery 1400 Moderate 14.76 Miles Amount CrossedLandscape Scenery 1410 High 2.76 Miles Amount CrossedLandscape Scenery 1410 Moderate 35.41 Miles Amount CrossedLandscape Scenery 1420 Low 7.95 Miles Amount CrossedLandscape Scenery 1430 Moderate 18.45 Miles Amount CrossedLandscape Scenery 1440 Low 8.36 Miles Amount CrossedLandscape Scenery 1450 Low 7.01 Miles Amount CrossedLandscape Scenery 1460 Low 35.91 Miles Amount CrossedLandscape Scenery 1470 High 13.04 Miles Amount CrossedLandscape Scenery 1470 Moderate 25.64 Miles Amount CrossedLandscape Scenery 1480 High 0.39 Miles Amount CrossedLandscape Scenery 1480 Low 54.88 Miles Amount CrossedLandscape Scenery 1480 Moderate 9.20 Miles Amount CrossedLandscape Scenery 1490 Moderate 14.10 Miles Amount CrossedLandscape Scenery 1490.05 High 0.52 Miles Amount CrossedLandscape Scenery 1490.05 Moderate 41.86 Miles Amount CrossedLandscape Scenery 1495 Moderate 7.64 Miles Amount CrossedLandscape Scenery 1500 Low 19.32 Miles Amount CrossedLandscape Scenery 1500.02 High 0.89 Miles Amount CrossedLandscape Scenery 1500.02 Low 17.73 Miles Amount CrossedLandscape Scenery 1500.05 High 7.73 Miles Amount CrossedLandscape Scenery 1500.05 Moderate 1.52 Miles Amount CrossedLandscape Scenery 1501.1 High 10.41 Miles Amount CrossedLandscape Scenery 1501.1 Moderate 3.75 Miles Amount CrossedLandscape Scenery 1501.15 Moderate 1.04 Miles Amount CrossedLandscape Scenery 1502.5 High 12.60 Miles Amount CrossedLandscape Scenery 1502.5 Low 29.98 Miles Amount CrossedLandscape Scenery 1502.5 Moderate 0.33 Miles Amount CrossedLandscape Scenery 1503 High 6.60 Miles Amount CrossedLandscape Scenery 1503.5 High 0.65 Miles Amount CrossedLandscape Scenery 1504 High 6.49 Miles Amount CrossedLandscape Scenery 1504 Moderate 0.49 Miles Amount CrossedLandscape Scenery 1505 High 9.25 Miles Amount CrossedLandscape Scenery 1506 High 23.89 Miles Amount CrossedLandscape Scenery 1506 Moderate 4.66 Miles Amount CrossedLandscape Scenery 1510 High 44.33 Miles Amount CrossedLandscape Scenery 1510 Moderate 12.19 Miles Amount CrossedLandscape Scenery 1520 High 85.64 Miles Amount CrossedLandscape Scenery 1520 Moderate 39.12 Miles Amount CrossedLandscape Scenery 1530 Low 7.00 Miles Amount CrossedLandscape Scenery 1540.1 Low 22.47 Miles Amount CrossedLandscape Scenery 1540.2 Low 18.80 Miles Amount CrossedLandscape Scenery 1545 High 0.06 Miles Amount CrossedLandscape Scenery 1545 Low 0.97 Miles Amount CrossedLandscape Scenery 1545 Moderate 2.01 Miles Amount Crossed

Page 122: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

Landscape Scenery 1550.1 High 19.97 Miles Amount CrossedLandscape Scenery 1550.1 Low 2.95 Miles Amount CrossedLandscape Scenery 1550.1 Moderate 2.06 Miles Amount CrossedLandscape Scenery 1550.2 High 2.05 Miles Amount CrossedLandscape Scenery 1550.2 Moderate 9.93 Miles Amount CrossedLandscape Scenery 1560 High 0.43 Miles Amount CrossedLandscape Scenery 1560 Moderate 11.05 Miles Amount CrossedLandscape Scenery 1570 High 0.27 Miles Amount CrossedLandscape Scenery 1570 Moderate 9.45 Miles Amount CrossedLandscape Scenery 1580 Low 3.62 Miles Amount CrossedLandscape Scenery 1590 Low 7.02 Miles Amount CrossedLandscape Scenery 1600 Low 5.49 Miles Amount CrossedLandscape Scenery 1610 Low 19.34 Miles Amount CrossedLandscape Scenery 1620 Low 6.17 Miles Amount CrossedLandscape Scenery 1630 Low 4.09 Miles Amount CrossedLandscape Scenery 1640 High 0.58 Miles Amount CrossedLandscape Scenery 1640 Low 0.52 Miles Amount CrossedLandscape Scenery 1640 Moderate 1.90 Miles Amount CrossedLandscape Scenery 1650 High 2.28 Miles Amount CrossedLandscape Scenery 1650 Low 0.32 Miles Amount CrossedLandscape Scenery 1650 Moderate 0.17 Miles Amount CrossedLandscape Scenery 1660 Low 5.44 Miles Amount CrossedLandscape Scenery 1660 Moderate 1.75 Miles Amount CrossedLandscape Scenery 1670 High 4.21 Miles Amount CrossedLandscape Scenery 1670 Moderate 0.59 Miles Amount CrossedLandscape Scenery 1680 High 2.76 Miles Amount CrossedLandscape Scenery 1680 Moderate 1.43 Miles Amount CrossedLandscape Scenery 1690 High 1.60 Miles Amount CrossedLandscape Scenery 1690 Moderate 3.83 Miles Amount CrossedLandscape Scenery 1700 Moderate 1.70 Miles Amount CrossedLandscape Scenery 1710 High 0.68 Miles Amount CrossedLandscape Scenery 1710 Low 1.56 Miles Amount CrossedLandscape Scenery 1710 Moderate 6.07 Miles Amount CrossedLandscape Scenery 1730 High 3.12 Miles Amount CrossedLandscape Scenery 1730 Moderate 4.94 Miles Amount CrossedLandscape Scenery 1740 Low 4.03 Miles Amount CrossedLandscape Scenery 1740 Moderate 0.81 Miles Amount CrossedLandscape Scenery 1750 Moderate 0.42 Miles Amount CrossedLandscape Scenery 1760 Low 7.41 Miles Amount CrossedLandscape Scenery 1760 Moderate 0.90 Miles Amount CrossedLandscape Scenery 1771 Low 19.51 Miles Amount CrossedLandscape Scenery 1771 Moderate 1.78 Miles Amount CrossedLandscape Scenery 1772 Low 0.31 Miles Amount CrossedLandscape Scenery 1780 Low 3.75 Miles Amount CrossedLandscape Scenery 1790 Low 11.98 Miles Amount Crossed

Page 123: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

Landscape Scenery 1790 Moderate 0.70 Miles Amount CrossedLandscape Scenery 1800 Low 0.93 Miles Amount CrossedLandscape Scenery 1810 Low 2.43 Miles Amount CrossedLandscape Scenery 1810 Moderate 5.54 Miles Amount CrossedLandscape Scenery 1820 Low 7.09 Miles Amount CrossedLandscape Scenery 1830 Low 0.46 Miles Amount CrossedMMNHL 1501.1 Registered Historic Boundary 0.00 Miles Amount CrossedMMNHL 1501.1 Site 0.55 Miles Amount CrossedOWNERSHIP 1210 BLM 215.73 Acres Construction DisturbanceOWNERSHIP 1210 BLM 44.19 Acres Operation DisturbanceOWNERSHIP 1210 NPS 0.00 Acres Construction DisturbanceOWNERSHIP 1210 NPS 0.00 Acres Operation DisturbanceOWNERSHIP 1210 PRIVATE 64.36 Acres Construction DisturbanceOWNERSHIP 1210 PRIVATE 12.33 Acres Operation DisturbanceOWNERSHIP 1210 STATE 32.16 Acres Construction DisturbanceOWNERSHIP 1210 STATE 5.12 Acres Operation DisturbanceOWNERSHIP 1211 BLM 96.23 Acres Construction DisturbanceOWNERSHIP 1211 BLM 22.40 Acres Operation DisturbanceOWNERSHIP 1211 ST-SITLA 6.71 Acres Construction DisturbanceOWNERSHIP 1211 ST-SITLA 1.51 Acres Operation DisturbanceOWNERSHIP 1212 BLM 215.43 Acres Construction DisturbanceOWNERSHIP 1212 BLM 87.01 Acres Operation DisturbanceOWNERSHIP 1212 PRIVATE 1.88 Acres Construction DisturbanceOWNERSHIP 1212 PRIVATE 1.31 Acres Operation DisturbanceOWNERSHIP 1212 ST-SITLA 9.78 Acres Construction DisturbanceOWNERSHIP 1212 ST-SITLA 4.55 Acres Operation DisturbanceOWNERSHIP 1214 BLM 100.64 Acres Construction DisturbanceOWNERSHIP 1214 BLM 23.96 Acres Operation DisturbanceOWNERSHIP 1214 PRIVATE 0.19 Acres Construction DisturbanceOWNERSHIP 1214 PRIVATE 0.10 Acres Operation DisturbanceOWNERSHIP 1214 ST-SITLA 44.54 Acres Construction DisturbanceOWNERSHIP 1214 ST-SITLA 9.54 Acres Operation DisturbanceOWNERSHIP 1215 BLM 84.38 Acres Construction DisturbanceOWNERSHIP 1215 BLM 18.63 Acres Operation DisturbanceOWNERSHIP 1215 ST-SITLA 8.10 Acres Construction DisturbanceOWNERSHIP 1215 ST-SITLA 1.76 Acres Operation DisturbanceOWNERSHIP 1215.05 BLM 136.26 Acres Construction DisturbanceOWNERSHIP 1215.05 BLM 40.67 Acres Operation DisturbanceOWNERSHIP 1215.05 ST-SITLA 4.43 Acres Construction DisturbanceOWNERSHIP 1215.05 ST-SITLA 2.29 Acres Operation DisturbanceOWNERSHIP 1320.05 BIA-TRIBAL 9.43 Acres Construction DisturbanceOWNERSHIP 1320.05 BIA-TRIBAL 3.01 Acres Operation DisturbanceOWNERSHIP 1320.05 BLM 144.70 Acres Construction DisturbanceOWNERSHIP 1320.05 BLM 26.33 Acres Operation DisturbanceOWNERSHIP 1320.05 PRIVATE 325.60 Acres Construction Disturbance

Page 124: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

OWNERSHIP 1320.05 PRIVATE 50.75 Acres Operation DisturbanceOWNERSHIP 1320.05 STATE 3.06 Acres Construction DisturbanceOWNERSHIP 1320.05 STATE 0.70 Acres Operation DisturbanceOWNERSHIP 1320.05 ST-SITLA 16.74 Acres Construction DisturbanceOWNERSHIP 1320.05 ST-SITLA 3.07 Acres Operation DisturbanceOWNERSHIP 1320.15 BLM 5.37 Acres Construction DisturbanceOWNERSHIP 1320.15 BLM 2.92 Acres Operation DisturbanceOWNERSHIP 1320.15 PRIVATE 319.13 Acres Construction DisturbanceOWNERSHIP 1320.15 PRIVATE 117.88 Acres Operation DisturbanceOWNERSHIP 1320.15 STATE 129.55 Acres Construction DisturbanceOWNERSHIP 1320.15 STATE 49.98 Acres Operation DisturbanceOWNERSHIP 1320.15 ST-DOT 0.01 Acres Construction DisturbanceOWNERSHIP 1320.15 ST-DOT 0.01 Acres Operation DisturbanceOWNERSHIP 1320.15 ST-SITLA 19.44 Acres Construction DisturbanceOWNERSHIP 1320.15 ST-SITLA 9.81 Acres Operation DisturbanceOWNERSHIP 1320.15 USFS 28.28 Acres Construction DisturbanceOWNERSHIP 1320.15 USFS 17.52 Acres Operation DisturbanceOWNERSHIP 1320.2 BLM 29.99 Acres Construction DisturbanceOWNERSHIP 1320.2 BLM 11.06 Acres Operation DisturbanceOWNERSHIP 1320.2 PRIVATE 73.17 Acres Construction DisturbanceOWNERSHIP 1320.2 PRIVATE 27.66 Acres Operation DisturbanceOWNERSHIP 1320.2 STATE 15.89 Acres Construction DisturbanceOWNERSHIP 1320.2 STATE 6.19 Acres Operation DisturbanceOWNERSHIP 1320.2 ST-SITLA 0.39 Acres Construction DisturbanceOWNERSHIP 1320.2 ST-SITLA 0.28 Acres Operation DisturbanceOWNERSHIP 1320.2 USFS 0.81 Acres Construction DisturbanceOWNERSHIP 1320.2 USFS 0.57 Acres Operation DisturbanceOWNERSHIP 1320.21 PRIVATE 5.12 Acres Construction DisturbanceOWNERSHIP 1320.21 PRIVATE 1.81 Acres Operation DisturbanceOWNERSHIP 1320.21 STATE 0.48 Acres Construction DisturbanceOWNERSHIP 1320.21 STATE 0.35 Acres Operation DisturbanceOWNERSHIP 1320.21 USFS 0.01 Acres Construction DisturbanceOWNERSHIP 1320.21 USFS 0.01 Acres Operation DisturbanceOWNERSHIP 1321.01 BIA-TRIBAL 2.56 Acres Construction DisturbanceOWNERSHIP 1321.01 BIA-TRIBAL 0.71 Acres Operation DisturbanceOWNERSHIP 1321.01 PRIVATE 354.78 Acres Construction DisturbanceOWNERSHIP 1321.01 PRIVATE 61.27 Acres Operation DisturbanceOWNERSHIP 1321.01 STATE 49.64 Acres Construction DisturbanceOWNERSHIP 1321.01 STATE 11.55 Acres Operation DisturbanceOWNERSHIP 1321.01 URMCC 0.42 Acres Construction DisturbanceOWNERSHIP 1321.01 URMCC 0.19 Acres Operation DisturbanceOWNERSHIP 1321.02 PRIVATE 14.79 Acres Construction DisturbanceOWNERSHIP 1321.02 PRIVATE 1.11 Acres Operation DisturbanceOWNERSHIP 1321.02 URMCC 1.34 Acres Construction DisturbanceOWNERSHIP 1321.02 URMCC 0.49 Acres Operation Disturbance

Page 125: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

OWNERSHIP 1322.01 PRIVATE 13.15 Acres Construction DisturbanceOWNERSHIP 1322.01 PRIVATE 1.55 Acres Operation DisturbanceOWNERSHIP 1322.01 URMCC 7.03 Acres Construction DisturbanceOWNERSHIP 1322.01 URMCC 1.49 Acres Operation DisturbanceOWNERSHIP 1322.02 BIA-TRIBAL 0.74 Acres Construction DisturbanceOWNERSHIP 1322.02 BIA-TRIBAL 0.15 Acres Operation DisturbanceOWNERSHIP 1322.02 PRIVATE 2.46 Acres Construction DisturbanceOWNERSHIP 1322.02 PRIVATE 0.51 Acres Operation DisturbanceOWNERSHIP 1322.02 STATE 54.43 Acres Construction DisturbanceOWNERSHIP 1322.02 STATE 11.44 Acres Operation DisturbanceOWNERSHIP 1322.02 URMCC 0.64 Acres Construction DisturbanceOWNERSHIP 1322.02 URMCC 0.13 Acres Operation DisturbanceOWNERSHIP 1322.11 PRIVATE 4.92 Acres Construction DisturbanceOWNERSHIP 1322.11 PRIVATE 0.76 Acres Operation DisturbanceOWNERSHIP 1322.11 STATE 35.92 Acres Construction DisturbanceOWNERSHIP 1322.11 STATE 5.55 Acres Operation DisturbanceOWNERSHIP 1322.11 URMCC 1.13 Acres Construction DisturbanceOWNERSHIP 1322.11 URMCC 0.17 Acres Operation DisturbanceOWNERSHIP 1322.12 PRIVATE 25.86 Acres Construction DisturbanceOWNERSHIP 1322.12 PRIVATE 3.52 Acres Operation DisturbanceOWNERSHIP 1322.21 PRIVATE 23.49 Acres Construction DisturbanceOWNERSHIP 1322.21 PRIVATE 5.78 Acres Operation DisturbanceOWNERSHIP 1322.22 PRIVATE 53.54 Acres Construction DisturbanceOWNERSHIP 1322.22 PRIVATE 7.26 Acres Operation DisturbanceOWNERSHIP 1322.22 STATE 2.92 Acres Construction DisturbanceOWNERSHIP 1322.22 STATE 0.40 Acres Operation DisturbanceOWNERSHIP 1322.23 PRIVATE 25.44 Acres Construction DisturbanceOWNERSHIP 1322.23 PRIVATE 5.01 Acres Operation DisturbanceOWNERSHIP 1322.23 STATE 0.61 Acres Construction DisturbanceOWNERSHIP 1322.23 STATE 0.06 Acres Operation DisturbanceOWNERSHIP 1322.23 URMCC 2.69 Acres Construction DisturbanceOWNERSHIP 1322.23 URMCC 0.38 Acres Operation DisturbanceOWNERSHIP 1322.51 PRIVATE 63.42 Acres Construction DisturbanceOWNERSHIP 1322.51 PRIVATE 10.40 Acres Operation DisturbanceOWNERSHIP 1322.51 STATE 8.67 Acres Construction DisturbanceOWNERSHIP 1322.51 STATE 1.42 Acres Operation DisturbanceOWNERSHIP 1322.51 URMCC 1.85 Acres Construction DisturbanceOWNERSHIP 1322.51 URMCC 0.30 Acres Operation DisturbanceOWNERSHIP 1322.52 PRIVATE 9.82 Acres Construction DisturbanceOWNERSHIP 1322.52 PRIVATE 2.07 Acres Operation DisturbanceOWNERSHIP 1322.52 STATE 1.32 Acres Construction DisturbanceOWNERSHIP 1322.52 STATE 0.28 Acres Operation DisturbanceOWNERSHIP 1322.53 PRIVATE 15.86 Acres Construction DisturbanceOWNERSHIP 1322.53 PRIVATE 4.22 Acres Operation DisturbanceOWNERSHIP 1322.53 STATE 9.40 Acres Construction Disturbance

Page 126: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

OWNERSHIP 1322.53 STATE 2.50 Acres Operation DisturbanceOWNERSHIP 1322.71 PRIVATE 205.96 Acres Construction DisturbanceOWNERSHIP 1322.71 PRIVATE 57.88 Acres Operation DisturbanceOWNERSHIP 1323.01 PRIVATE 62.26 Acres Construction DisturbanceOWNERSHIP 1323.01 PRIVATE 15.91 Acres Operation DisturbanceOWNERSHIP 1323.01 STATE 27.12 Acres Construction DisturbanceOWNERSHIP 1323.01 STATE 7.28 Acres Operation DisturbanceOWNERSHIP 1323.01 URMCC 4.37 Acres Construction DisturbanceOWNERSHIP 1323.01 URMCC 1.09 Acres Operation DisturbanceOWNERSHIP 1323.02 BOR 12.24 Acres Construction DisturbanceOWNERSHIP 1323.02 BOR 5.03 Acres Operation DisturbanceOWNERSHIP 1323.02 PRIVATE 123.75 Acres Construction DisturbanceOWNERSHIP 1323.02 PRIVATE 46.71 Acres Operation DisturbanceOWNERSHIP 1323.02 STATE 37.71 Acres Construction DisturbanceOWNERSHIP 1323.02 STATE 10.70 Acres Operation DisturbanceOWNERSHIP 1323.02 URMCC 11.49 Acres Construction DisturbanceOWNERSHIP 1323.02 URMCC 6.08 Acres Operation DisturbanceOWNERSHIP 1323.02 USFS 57.30 Acres Construction DisturbanceOWNERSHIP 1323.02 USFS 14.55 Acres Operation DisturbanceOWNERSHIP 1324 PRIVATE 2.02 Acres Construction DisturbanceOWNERSHIP 1324 PRIVATE 1.43 Acres Operation DisturbanceOWNERSHIP 1324 USFS 78.56 Acres Construction DisturbanceOWNERSHIP 1324 USFS 31.45 Acres Operation DisturbanceOWNERSHIP 1325 PRIVATE 1.65 Acres Construction DisturbanceOWNERSHIP 1325 PRIVATE 0.62 Acres Operation DisturbanceOWNERSHIP 1325 STATE 2.68 Acres Construction DisturbanceOWNERSHIP 1325 STATE 1.00 Acres Operation DisturbanceOWNERSHIP 1325 USFS 154.42 Acres Construction DisturbanceOWNERSHIP 1325 USFS 62.70 Acres Operation DisturbanceOWNERSHIP 1350 BLM 50.70 Acres Construction DisturbanceOWNERSHIP 1350 BLM 15.99 Acres Operation DisturbanceOWNERSHIP 1350 PRIVATE 145.23 Acres Construction DisturbanceOWNERSHIP 1350 PRIVATE 54.86 Acres Operation DisturbanceOWNERSHIP 1350 STATE 31.58 Acres Construction DisturbanceOWNERSHIP 1350 STATE 10.87 Acres Operation DisturbanceOWNERSHIP 1350 ST-SITLA 13.30 Acres Construction DisturbanceOWNERSHIP 1350 ST-SITLA 4.45 Acres Operation DisturbanceOWNERSHIP 1350 USFS 3.37 Acres Construction DisturbanceOWNERSHIP 1350 USFS 1.35 Acres Operation DisturbanceOWNERSHIP 1360 BLM 284.26 Acres Construction DisturbanceOWNERSHIP 1360 BLM 61.86 Acres Operation DisturbanceOWNERSHIP 1360 PRIVATE 89.36 Acres Construction DisturbanceOWNERSHIP 1360 PRIVATE 23.34 Acres Operation DisturbanceOWNERSHIP 1360 ST-SITLA 5.34 Acres Construction DisturbanceOWNERSHIP 1360 ST-SITLA 1.94 Acres Operation Disturbance

Page 127: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

OWNERSHIP 1430 BLM 188.35 Acres Construction DisturbanceOWNERSHIP 1430 BLM 37.77 Acres Operation DisturbanceOWNERSHIP 1430 PRIVATE 17.50 Acres Construction DisturbanceOWNERSHIP 1430 PRIVATE 3.55 Acres Operation DisturbanceOWNERSHIP 1430 ST-SITLA 16.29 Acres Construction DisturbanceOWNERSHIP 1430 ST-SITLA 3.28 Acres Operation DisturbancePFYC 1030 3 17.96 MILES Amount CrossedPFYC 1030 3-5 3.91 MILES Amount CrossedPFYC 1030 4-5 7.47 MILES Amount CrossedPFYC 1030 UNRATED 2.90 MILES Amount CrossedPFYC 1040 3 0.60 MILES Amount CrossedPFYC 1040 4-5 6.35 MILES Amount CrossedPFYC 1040 UNRATED 2.22 MILES Amount CrossedPFYC 1100 3 11.45 MILES Amount CrossedPFYC 1100 3-5 2.89 MILES Amount CrossedPFYC 1100 UNRATED 0.30 MILES Amount CrossedPFYC 1101 3-5 0.80 MILES Amount CrossedPFYC 1103 3-5 2.88 MILES Amount CrossedPFYC 1104 3-5 3.94 MILES Amount CrossedPFYC 1105 3 0.56 MILES Amount CrossedPFYC 1105 3-5 4.23 MILES Amount CrossedPFYC 1106 3 0.37 MILES Amount CrossedPFYC 1106 3-5 5.10 MILES Amount CrossedPFYC 1106 4-5 0.20 MILES Amount CrossedPFYC 1110 4-5 5.03 MILES Amount CrossedPFYC 1110 UNRATED 1.93 MILES Amount CrossedPFYC 1115 4-5 44.77 MILES Amount CrossedPFYC 1115 UNRATED 1.10 MILES Amount CrossedPFYC 1116 4-5 7.13 MILES Amount CrossedPFYC 1116 UNRATED 0.27 MILES Amount CrossedPFYC 1120 4-5 29.26 MILES Amount CrossedPFYC 1120 UNRATED 3.42 MILES Amount CrossedPFYC 1120.1 4-5 2.05 MILES Amount CrossedPFYC 1120.2 4-5 3.04 MILES Amount CrossedPFYC 1180 4-5 4.43 MILES Amount CrossedPFYC 1187 3-5 12.74 MILES Amount CrossedPFYC 1187 4-5 0.78 MILES Amount CrossedPFYC 1187 4-5 27.88 MILES Amount CrossedPFYC 1187 UNRATED 1.05 MILES Amount CrossedPFYC 1187 UNRATED 2.93 MILES Amount CrossedPFYC 1190 3 22.76 MILES Amount CrossedPFYC 1190 3 23.42 MILES Amount CrossedPFYC 1190 3-5 21.07 MILES Amount CrossedPFYC 1190 4-5 19.18 MILES Amount CrossedPFYC 1190 4-5 30.18 MILES Amount Crossed

Page 128: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

PFYC 1190 UNRATED 6.43 MILES Amount CrossedPFYC 1190 UNRATED 10.53 MILES Amount CrossedPFYC 1210 3 5.84 MILES Amount CrossedPFYC 1210 3-5 0.08 MILES Amount CrossedPFYC 1210 3-5 16.21 MILES Amount CrossedPFYC 1210 UNRATED 2.59 MILES Amount CrossedPFYC 1211 3-5 1.38 MILES Amount CrossedPFYC 1211 4-5 4.78 MILES Amount CrossedPFYC 1211 UNRATED 2.12 MILES Amount CrossedPFYC 1212 4-5 11.50 MILES Amount CrossedPFYC 1212 UNRATED 2.13 MILES Amount CrossedPFYC 1214 3-5 0.95 MILES Amount CrossedPFYC 1214 4-5 4.96 MILES Amount CrossedPFYC 1214 UNRATED 4.09 MILES Amount CrossedPFYC 1215 4-5 4.60 MILES Amount CrossedPFYC 1215 UNRATED 2.68 MILES Amount CrossedPFYC 1215.05 4-5 9.18 MILES Amount CrossedPFYC 1215.05 UNRATED 0.40 MILES Amount CrossedPFYC 1217.01 4-5 66.15 MILES Amount CrossedPFYC 1217.01 UNRATED 0.00 MILES Amount CrossedPFYC 1217.01 UNRATED 10.71 MILES Amount CrossedPFYC 1217.02 4-5 9.82 MILES Amount CrossedPFYC 1217.02 UNRATED 6.21 MILES Amount CrossedPFYC 1217.051 4-5 0.99 MILES Amount CrossedPFYC 1217.051 UNRATED 0.04 MILES Amount CrossedPFYC 1217.051 UNRATED 19.28 MILES Amount CrossedPFYC 1217.052 4-5 10.76 MILES Amount CrossedPFYC 1217.052 UNRATED 5.07 MILES Amount CrossedPFYC 1217.1 3 10.48 MILES Amount CrossedPFYC 1217.1 4-5 2.52 MILES Amount CrossedPFYC 1217.1 UNRATED 0.04 MILES Amount CrossedPFYC 1217.1 UNRATED 7.83 MILES Amount CrossedPFYC 1217.15 3 1.90 MILES Amount CrossedPFYC 1217.15 4-5 12.28 MILES Amount CrossedPFYC 1217.15 UNRATED 22.19 MILES Amount CrossedPFYC 1218 4-5 11.97 MILES Amount CrossedPFYC 1219.1 4-5 0.60 MILES Amount CrossedPFYC 1219.2 4-5 0.05 MILES Amount CrossedPFYC 1219.2 4-5 18.62 MILES Amount CrossedPFYC 1219.2 UNRATED 1.13 MILES Amount CrossedPFYC 1219.3 UNRATED 1.47 MILES Amount CrossedPFYC 1219.4 UNRATED 0.94 MILES Amount CrossedPFYC 1219.45 4-5 0.77 MILES Amount CrossedPFYC 1219.45 UNRATED 0.83 MILES Amount CrossedPFYC 1219.5 4-5 0.04 MILES Amount Crossed

Page 129: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

PFYC 1219.5 4-5 12.19 MILES Amount CrossedPFYC 1219.5 UNRATED 4.60 MILES Amount CrossedPFYC 1219.6 4-5 3.36 MILES Amount CrossedPFYC 1219.6 UNRATED 1.21 MILES Amount CrossedPFYC 1220 3 19.07 MILES Amount CrossedPFYC 1220 3 58.20 MILES Amount CrossedPFYC 1220 3-5 26.02 MILES Amount CrossedPFYC 1220 4-5 12.65 MILES Amount CrossedPFYC 1220 4-5 14.03 MILES Amount CrossedPFYC 1220 UNRATED 8.02 MILES Amount CrossedPFYC 1220 UNRATED 10.42 MILES Amount CrossedPFYC 1220 UNRATED 31.93 MILES Amount CrossedPFYC 1222.05 3 18.16 MILES Amount CrossedPFYC 1222.05 3-5 3.07 MILES Amount CrossedPFYC 1222.05 UNRATED 19.94 MILES Amount CrossedPFYC 1222.3 3 5.36 MILES Amount CrossedPFYC 1222.3 UNRATED 0.08 MILES Amount CrossedPFYC 1222.3 UNRATED 8.73 MILES Amount CrossedPFYC 1223 3 8.47 MILES Amount CrossedPFYC 1223 UNRATED 0.08 MILES Amount CrossedPFYC 1223 UNRATED 9.60 MILES Amount CrossedPFYC 1225.2 3 22.43 MILES Amount CrossedPFYC 1225.2 3-5 4.08 MILES Amount CrossedPFYC 1225.2 4-5 2.84 MILES Amount CrossedPFYC 1225.2 UNRATED 9.07 MILES Amount CrossedPFYC 1270 3 6.00 MILES Amount CrossedPFYC 1270 UNRATED 0.05 MILES Amount CrossedPFYC 1270 UNRATED 4.72 MILES Amount CrossedPFYC 1310 3 3.83 MILES Amount CrossedPFYC 1310 4-5 15.45 MILES Amount CrossedPFYC 1310 UNRATED 30.98 MILES Amount CrossedPFYC 1320.05 4-5 13.67 MILES Amount CrossedPFYC 1320.05 UNRATED 23.78 MILES Amount CrossedPFYC 1320.15 3 0.81 MILES Amount CrossedPFYC 1320.15 4-5 14.01 MILES Amount CrossedPFYC 1320.15 UNRATED 13.16 MILES Amount CrossedPFYC 1320.2 3 1.79 MILES Amount CrossedPFYC 1320.2 4-5 1.48 MILES Amount CrossedPFYC 1320.2 UNRATED 3.12 MILES Amount CrossedPFYC 1320.21 UNRATED 0.27 MILES Amount CrossedPFYC 1321 4-5 17.97 MILES Amount CrossedPFYC 1321 UNRATED 13.59 MILES Amount CrossedPFYC 1321.01 4-5 17.09 MILES Amount CrossedPFYC 1321.01 UNRATED 13.59 MILES Amount CrossedPFYC 1321.02 4-5 0.98 MILES Amount Crossed

Page 130: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

PFYC 1322 4-5 4.85 MILES Amount CrossedPFYC 1322 UNRATED 2.15 MILES Amount CrossedPFYC 1322.01 4-5 1.20 MILES Amount CrossedPFYC 1322.01 UNRATED 0.64 MILES Amount CrossedPFYC 1322.02 4-5 3.56 MILES Amount CrossedPFYC 1322.02 UNRATED 1.51 MILES Amount CrossedPFYC 1322.11 4-5 3.60 MILES Amount CrossedPFYC 1322.11 UNRATED 0.35 MILES Amount CrossedPFYC 1322.12 4-5 0.62 MILES Amount CrossedPFYC 1322.12 UNRATED 0.57 MILES Amount CrossedPFYC 1322.21 4-5 1.44 MILES Amount CrossedPFYC 1322.21 UNRATED 0.53 MILES Amount CrossedPFYC 1322.22 4-5 4.08 MILES Amount CrossedPFYC 1322.22 UNRATED 0.05 MILES Amount CrossedPFYC 1322.23 4-5 0.89 MILES Amount CrossedPFYC 1322.23 UNRATED 0.25 MILES Amount CrossedPFYC 1322.5 4-5 7.41 MILES Amount CrossedPFYC 1322.51 4-5 4.99 MILES Amount CrossedPFYC 1322.52 4-5 0.97 MILES Amount CrossedPFYC 1322.53 4-5 1.37 MILES Amount CrossedPFYC 1322.71 4-5 11.94 MILES Amount CrossedPFYC 1323 4-5 11.35 MILES Amount CrossedPFYC 1323 UNRATED 8.79 MILES Amount CrossedPFYC 1323 UNRATED 1.50 MILES Amount CrossedPFYC 1323.01 4-5 5.02 MILES Amount CrossedPFYC 1323.01 UNRATED 1.50 MILES Amount CrossedPFYC 1323.02 4-5 6.33 MILES Amount CrossedPFYC 1323.02 UNRATED 8.79 MILES Amount CrossedPFYC 1324 4-5 1.66 MILES Amount CrossedPFYC 1324 UNRATED 2.99 MILES Amount CrossedPFYC 1324.2 4-5 1.10 MILES Amount CrossedPFYC 1324.2 UNRATED 3.59 MILES Amount CrossedPFYC 1324.4 4-5 1.10 MILES Amount CrossedPFYC 1324.4 UNRATED 3.65 MILES Amount CrossedPFYC 1325 4-5 2.31 MILES Amount CrossedPFYC 1325 4-5 5.77 MILES Amount CrossedPFYC 1325 UNRATED 1.01 MILES Amount CrossedPFYC 1325.1 4-5 22.04 MILES Amount CrossedPFYC 1325.1 UNRATED 21.24 MILES Amount CrossedPFYC 1325.2 4-5 3.07 MILES Amount CrossedPFYC 1325.2 UNRATED 1.05 MILES Amount CrossedPFYC 1330.1 3 2.69 MILES Amount CrossedPFYC 1330.1 3 13.44 MILES Amount CrossedPFYC 1330.1 4-5 1.27 MILES Amount CrossedPFYC 1330.1 4-5 4.89 MILES Amount Crossed

Page 131: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

PFYC 1330.1 UNRATED 53.38 MILES Amount CrossedPFYC 1330.1 UNRATED 23.26 MILES Amount CrossedPFYC 1340 UNRATED 20.00 MILES Amount CrossedPFYC 1350 3 0.35 MILES Amount CrossedPFYC 1350 4-5 0.64 MILES Amount CrossedPFYC 1350 UNRATED 13.73 MILES Amount CrossedPFYC 1360 2 0.56 MILES Amount CrossedPFYC 1360 UNRATED 28.07 MILES Amount CrossedPFYC 1370 UNRATED 14.69 MILES Amount CrossedPFYC 1380 UNRATED 14.55 MILES Amount CrossedPFYC 1390 2 0.04 MILES Amount CrossedPFYC 1390 UNRATED 6.82 MILES Amount CrossedPFYC 1400 4-5 1.55 MILES Amount CrossedPFYC 1400 UNRATED 22.49 MILES Amount CrossedPFYC 1410 UNRATED 38.16 MILES Amount CrossedPFYC 1420 UNRATED 8.66 MILES Amount CrossedPFYC 1430 2 8.82 MILES Amount CrossedPFYC 1430 UNRATED 28.08 MILES Amount CrossedPFYC 1440 2 6.91 MILES Amount CrossedPFYC 1440 UNRATED 9.97 MILES Amount CrossedPFYC 1450 2 3.11 MILES Amount CrossedPFYC 1450 UNRATED 7.77 MILES Amount CrossedPFYC 1460 4-5 0.18 MILES Amount CrossedPFYC 1460 UNRATED 35.75 MILES Amount CrossedPFYC 1470 4-5 0.85 MILES Amount CrossedPFYC 1470 UNRATED 0.00 MILES Amount CrossedPFYC 1470 UNRATED 0.08 MILES Amount CrossedPFYC 1470 UNRATED 37.77 MILES Amount CrossedPFYC 1480 3 0.68 MILES Amount CrossedPFYC 1480 3 1.28 MILES Amount CrossedPFYC 1480 4-5 0.20 MILES Amount CrossedPFYC 1480 UNRATED 28.38 MILES Amount CrossedPFYC 1480 UNRATED 33.99 MILES Amount CrossedPFYC 1490 UNRATED 11.99 MILES Amount CrossedPFYC 1490 UNRATED 2.11 MILES Amount CrossedPFYC 1490.05 UNRATED 1.60 MILES Amount CrossedPFYC 1490.05 UNRATED 3.86 MILES Amount CrossedPFYC 1490.05 UNRATED 36.91 MILES Amount CrossedPFYC 1495 UNRATED 7.64 MILES Amount CrossedPFYC 1500 UNRATED 9.32 MILES Amount CrossedPFYC 1500 UNRATED 10.00 MILES Amount CrossedPFYC 1500.02 UNRATED 18.62 MILES Amount CrossedPFYC 1500.05 4-5 0.39 MILES Amount CrossedPFYC 1500.05 UNRATED 8.86 MILES Amount CrossedPFYC 1501.1 4-5 1.33 MILES Amount Crossed

Page 132: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

PFYC 1501.1 UNRATED 12.83 MILES Amount CrossedPFYC 1501.15 UNRATED 1.04 MILES Amount CrossedPFYC 1502.5 3 5.05 MILES Amount CrossedPFYC 1502.5 3-5 0.47 MILES Amount CrossedPFYC 1502.5 4-5 0.48 MILES Amount CrossedPFYC 1502.5 UNRATED 0.02 MILES Amount CrossedPFYC 1502.5 UNRATED 12.26 MILES Amount CrossedPFYC 1502.5 UNRATED 24.66 MILES Amount CrossedPFYC 1503 4-5 1.63 MILES Amount CrossedPFYC 1503 UNRATED 4.97 MILES Amount CrossedPFYC 1503.5 UNRATED 0.65 MILES Amount CrossedPFYC 1504 UNRATED 6.99 MILES Amount CrossedPFYC 1505 3 0.04 MILES Amount CrossedPFYC 1505 UNRATED 9.21 MILES Amount CrossedPFYC 1506 4-5 2.02 MILES Amount CrossedPFYC 1506 UNRATED 26.54 MILES Amount CrossedPFYC 1510 3 3.16 MILES Amount CrossedPFYC 1510 UNRATED 53.36 MILES Amount CrossedPFYC 1520 UNRATED 124.76 MILES Amount CrossedPFYC 1530 3 0.42 MILES Amount CrossedPFYC 1530 UNRATED 6.59 MILES Amount CrossedPFYC 1540.1 UNRATED 22.47 MILES Amount CrossedPFYC 1540.2 UNRATED 18.80 MILES Amount CrossedPFYC 1545 UNRATED 3.05 MILES Amount CrossedPFYC 1550.1 3 0.30 MILES Amount CrossedPFYC 1550.1 UNRATED 24.68 MILES Amount CrossedPFYC 1550.2 3 0.23 MILES Amount CrossedPFYC 1550.2 UNRATED 11.76 MILES Amount CrossedPFYC 1560 3 0.20 MILES Amount CrossedPFYC 1560 UNRATED 11.28 MILES Amount CrossedPFYC 1570 3 0.06 MILES Amount CrossedPFYC 1570 UNRATED 9.65 MILES Amount CrossedPFYC 1580 UNRATED 3.62 MILES Amount CrossedPFYC 1590 UNRATED 7.02 MILES Amount CrossedPFYC 1600 UNRATED 5.49 MILES Amount CrossedPFYC 1610 UNRATED 19.34 MILES Amount CrossedPFYC 1620 UNRATED 6.17 MILES Amount CrossedPFYC 1630 UNRATED 4.09 MILES Amount CrossedPFYC 1640 UNRATED 3.00 MILES Amount CrossedPFYC 1650 UNRATED 2.77 MILES Amount CrossedPFYC 1660 3 0.43 MILES Amount CrossedPFYC 1660 UNRATED 6.76 MILES Amount CrossedPFYC 1670 UNRATED 4.79 MILES Amount CrossedPFYC 1680 UNRATED 4.18 MILES Amount CrossedPFYC 1690 UNRATED 5.42 MILES Amount Crossed

Page 133: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

PFYC 1700 UNRATED 1.70 MILES Amount CrossedPFYC 1710 UNRATED 8.31 MILES Amount CrossedPFYC 1730 UNRATED 8.06 MILES Amount CrossedPFYC 1740 UNRATED 4.84 MILES Amount CrossedPFYC 1750 UNRATED 0.42 MILES Amount CrossedPFYC 1760 3 0.99 MILES Amount CrossedPFYC 1760 UNRATED 7.32 MILES Amount CrossedPFYC 1771 UNRATED 21.29 MILES Amount CrossedPFYC 1772 UNRATED 0.31 MILES Amount CrossedPFYC 1780 UNRATED 3.75 MILES Amount CrossedPFYC 1790 UNRATED 12.68 MILES Amount CrossedPFYC 1800 UNRATED 0.93 MILES Amount CrossedPFYC 1810 UNRATED 7.97 MILES Amount CrossedPFYC 1820 UNRATED 7.09 MILES Amount CrossedPFYC 1830 UNRATED 0.46 MILES Amount CrossedPUBLIC_SAFETY-SENSREC 1190 Sensitive Receptor 1.00 Each CountPUBLIC_SAFETY-SENSREC 1215 Sensitive Receptor 1.00 Each CountPUBLIC_SAFETY-SENSREC 1217.051 Sensitive Receptor 1.00 Each CountPUBLIC_SAFETY-SENSREC 1217.052 Sensitive Receptor 2.00 Each CountPUBLIC_SAFETY-SENSREC 1217.1 Sensitive Receptor 5.00 Each CountPUBLIC_SAFETY-SENSREC 1217.15 Sensitive Receptor 1.00 Each CountPUBLIC_SAFETY-SENSREC 1220 Sensitive Receptor 3.00 Each CountPUBLIC_SAFETY-SENSREC 1222.05 Sensitive Receptor 1.00 Each CountPUBLIC_SAFETY-SENSREC 1223 Sensitive Receptor 1.00 Each CountPUBLIC_SAFETY-SENSREC 1320.15 Sensitive Receptor 3.00 Each CountPUBLIC_SAFETY-SENSREC 1321 Sensitive Receptor 2.00 Each CountPUBLIC_SAFETY-SENSREC 1323 Sensitive Receptor 4.00 Each CountPUBLIC_SAFETY-SENSREC 1325.1 Sensitive Receptor 2.00 Each CountPUBLIC_SAFETY-SENSREC 1330.1 Sensitive Receptor 1.00 Each CountPUBLIC_SAFETY-SENSREC 1350 Sensitive Receptor 1.00 Each CountPUBLIC_SAFETY-SENSREC 1500.05 Sensitive Receptor 1.00 Each CountPUBLIC_SAFETY-SENSREC 1501.1 Sensitive Receptor 2.00 Each CountPUBLIC_SAFETY-SENSREC 1506 Sensitive Receptor 1.00 Each CountPUBLIC_SAFETY-SENSREC 1520 Sensitive Receptor 1.00 Each CountPUBLIC_SAFETY-SENSREC 1545 Sensitive Receptor 2.00 Each CountPUBLIC_SAFETY-SENSREC 1760 Sensitive Receptor 1.00 Each CountRAPTORS 1030 American Kestrel 2.00 Each CountRAPTORS 1030 Common Raven 1.00 Each CountRAPTORS 1030 Ferruginous Hawk 87.00 Each CountRAPTORS 1030 Golden Eagle 11.00 Each CountRAPTORS 1030 Northern Harrier 1.00 Each CountRAPTORS 1030 Prairie Falcon 3.00 Each CountRAPTORS 1030 Red-tailed Hawk 3.00 Each CountRAPTORS 1030 Swainson's Hawk 1.00 Each CountRAPTORS 1030 Unknown Buteo Species 3.00 Each Count

Page 134: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

RAPTORS 1030 Unknown Raptor Species 12.00 Each CountRAPTORS 1040 Burrowing Owl 1.00 Each CountRAPTORS 1040 Ferruginous Hawk 1.00 Each CountRAPTORS 1040 Unknown Raptor Species 3.00 Each CountRAPTORS 1100 Ferruginous Hawk 3.00 Each CountRAPTORS 1100 Unknown Raptor Species 34.00 Each CountRAPTORS 1110 Ferruginous Hawk 2.00 Each CountRAPTORS 1110 Golden Eagle 1.00 Each CountRAPTORS 1115 American Kestrel 1.00 Each CountRAPTORS 1115 Burrowing Owl 5.00 Each CountRAPTORS 1115 Cooper's Hawk 2.00 Each CountRAPTORS 1115 Ferruginous Hawk 35.00 Each CountRAPTORS 1115 Golden Eagle 13.00 Each CountRAPTORS 1115 Great-horned Owl 3.00 Each CountRAPTORS 1115 Prairie Falcon 3.00 Each CountRAPTORS 1115 Red-tailed Hawk 9.00 Each CountRAPTORS 1115 Unknown Buteo Species 5.00 Each CountRAPTORS 1115 Unknown Raptor Species 6.00 Each CountRAPTORS 1116 American Kestrel 1.00 Each CountRAPTORS 1116 Cooper's Hawk 1.00 Each CountRAPTORS 1116 Golden Eagle 1.00 Each CountRAPTORS 1116 Prairie Falcon 3.00 Each CountRAPTORS 1116 Red-tailed Hawk 4.00 Each CountRAPTORS 1116 Unknown Buteo Species 7.00 Each CountRAPTORS 1116 Unknown Raptor Species 16.00 Each CountRAPTORS 1120 American Kestrel 1.00 Each CountRAPTORS 1120 Burrowing Owl 4.00 Each CountRAPTORS 1120 Ferruginous Hawk 38.00 Each CountRAPTORS 1120 Golden Eagle 6.00 Each CountRAPTORS 1120 Prairie Falcon 1.00 Each CountRAPTORS 1120 Red-tailed Hawk 2.00 Each CountRAPTORS 1120 Unknown Buteo Species 2.00 Each CountRAPTORS 1120.1 American Kestrel 1.00 Each CountRAPTORS 1120.1 Golden Eagle 1.00 Each CountRAPTORS 1120.1 Prairie Falcon 1.00 Each CountRAPTORS 1120.1 Red-tailed Hawk 4.00 Each CountRAPTORS 1120.1 Unknown Buteo Species 2.00 Each CountRAPTORS 1120.1 Unknown Raptor Species 3.00 Each CountRAPTORS 1120.2 Golden Eagle 1.00 Each CountRAPTORS 1120.2 Red-tailed Hawk 4.00 Each CountRAPTORS 1120.2 Unknown Buteo Species 3.00 Each CountRAPTORS 1120.2 Unknown Raptor Species 1.00 Each CountRAPTORS 1180 Golden Eagle 1.00 Each CountRAPTORS 1180 Unknown Buteo Species 2.00 Each CountRAPTORS 1180 Unknown Raptor Species 1.00 Each Count

Page 135: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

RAPTORS 1187 Cooper's Hawk 2.00 Each CountRAPTORS 1187 Ferruginous Hawk 10.00 Each CountRAPTORS 1187 Golden Eagle 14.00 Each CountRAPTORS 1187 Northern Goshawk 1.00 Each CountRAPTORS 1187 Prairie Falcon 3.00 Each CountRAPTORS 1187 Red-tailed Hawk 2.00 Each CountRAPTORS 1187 Unknown Raptor Species 16.00 Each CountRAPTORS 1190 American Kestrel 7.00 Each CountRAPTORS 1190 Bald Eagle 5.00 Each CountRAPTORS 1190 Burrowing Owl 3.00 Each CountRAPTORS 1190 Cooper's Hawk 3.00 Each CountRAPTORS 1190 Ferruginous Hawk 97.00 Each CountRAPTORS 1190 Golden Eagle 65.00 Each CountRAPTORS 1190 Great-horned Owl 6.00 Each CountRAPTORS 1190 Northern Harrier 1.00 Each CountRAPTORS 1190 Prairie Falcon 6.00 Each CountRAPTORS 1190 Red-tailed Hawk 23.00 Each CountRAPTORS 1190 Swainson's Hawk 4.00 Each CountRAPTORS 1190 Unknown Accipiter Species 1.00 Each CountRAPTORS 1190 Unknown Buteo Species 16.00 Each CountRAPTORS 1190 Unknown Raptor Species 73.00 Each CountRAPTORS 1210 Unknown Raptor Species 78.00 Each CountRAPTORS 1211 Ferruginous Hawk 19.00 Each CountRAPTORS 1211 Golden Eagle 2.00 Each CountRAPTORS 1211 Red-tailed Hawk 2.00 Each CountRAPTORS 1211 Unknown Raptor Species 3.00 Each CountRAPTORS 1212 Ferruginous Hawk 4.00 Each CountRAPTORS 1212 Golden Eagle 9.00 Each CountRAPTORS 1212 Great-horned Owl 2.00 Each CountRAPTORS 1212 Prairie Falcon 4.00 Each CountRAPTORS 1212 Red-tailed Hawk 14.00 Each CountRAPTORS 1212 Unknown Raptor Species 4.00 Each CountRAPTORS 1214 Ferruginous Hawk 49.00 Each CountRAPTORS 1214 Golden Eagle 3.00 Each CountRAPTORS 1214 Red-tailed Hawk 1.00 Each CountRAPTORS 1214 Unknown Raptor Species 2.00 Each CountRAPTORS 1215 Ferruginous Hawk 12.00 Each CountRAPTORS 1215 Red-tailed Hawk 4.00 Each CountRAPTORS 1215 Unknown Raptor Species 1.00 Each CountRAPTORS 1215.05 American Kestrel 1.00 Each CountRAPTORS 1215.05 Ferruginous Hawk 11.00 Each CountRAPTORS 1215.05 Golden Eagle 3.00 Each CountRAPTORS 1215.05 Great-horned Owl 2.00 Each CountRAPTORS 1215.05 Prairie Falcon 1.00 Each CountRAPTORS 1215.05 Red-tailed Hawk 17.00 Each Count

Page 136: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

RAPTORS 1217.01 American Kestrel 4.00 Each CountRAPTORS 1217.01 Bald Eagle - Roosting Site 4.00 Each CountRAPTORS 1217.01 Burrowing Owl 21.00 Each CountRAPTORS 1217.01 Common Raven 3.00 Each CountRAPTORS 1217.01 Cooper's Hawk 4.00 Each CountRAPTORS 1217.01 Ferruginous Hawk 6.00 Each CountRAPTORS 1217.01 Golden Eagle 31.00 Each CountRAPTORS 1217.01 Great-horned Owl 9.00 Each CountRAPTORS 1217.01 Northern Goshawk 1.00 Each CountRAPTORS 1217.01 Peregrine Falcon 3.00 Each CountRAPTORS 1217.01 Prairie Falcon 5.00 Each CountRAPTORS 1217.01 Red-tailed Hawk 15.00 Each CountRAPTORS 1217.01 Short-eared Owl 1.00 Each CountRAPTORS 1217.01 Unknown Raptor Species 11.00 Each CountRAPTORS 1217.02 Golden Eagle 4.00 Each CountRAPTORS 1217.051 Golden Eagle 1.00 Each CountRAPTORS 1217.052 Red-tailed Hawk 2.00 Each CountRAPTORS 1217.1 Cooper's Hawk 5.00 Each CountRAPTORS 1217.1 Golden Eagle 25.00 Each CountRAPTORS 1217.1 Northern Goshawk 4.00 Each CountRAPTORS 1217.1 Osprey 1.00 Each CountRAPTORS 1217.1 Red-tailed Hawk 13.00 Each CountRAPTORS 1217.1 Unknown Falcon Species 1.00 Each CountRAPTORS 1217.1 Unknown Raptor Species 1.00 Each CountRAPTORS 1217.15 Golden Eagle 12.00 Each CountRAPTORS 1217.15 Northern Goshawk 19.00 Each CountRAPTORS 1217.15 Red-tailed Hawk 5.00 Each CountRAPTORS 1217.15 Unknown Raptor Species 3.00 Each CountRAPTORS 1219.4 Golden Eagle 1.00 Each CountRAPTORS 1219.45 Golden Eagle 1.00 Each CountRAPTORS 1219.5 Golden Eagle 1.00 Each CountRAPTORS 1220 Burrowing Owl 5.00 Each CountRAPTORS 1220 Cooper's Hawk 2.00 Each CountRAPTORS 1220 Ferruginous Hawk 15.00 Each CountRAPTORS 1220 Golden Eagle 2.00 Each CountRAPTORS 1220 Long-eared Owl 2.00 Each CountRAPTORS 1220 Prairie Falcon 1.00 Each CountRAPTORS 1220 Unknown Buteo Species 5.00 Each CountRAPTORS 1220 Unknown Raptor Species 111.00 Each CountRAPTORS 1222.05 Cooper's Hawk 1.00 Each CountRAPTORS 1222.05 Golden Eagle 2.00 Each CountRAPTORS 1222.05 Red-tailed Hawk 4.00 Each CountRAPTORS 1222.05 Unknown Buteo Species 4.00 Each CountRAPTORS 1222.05 Unknown Raptor Species 1.00 Each CountRAPTORS 1222.3 Golden Eagle 22.00 Each Count

Page 137: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

RAPTORS 1222.3 Red-tailed Hawk 1.00 Each CountRAPTORS 1223 Cooper's Hawk 5.00 Each CountRAPTORS 1223 Ferruginous Hawk 1.00 Each CountRAPTORS 1223 Golden Eagle 37.00 Each CountRAPTORS 1223 Northern Goshawk 3.00 Each CountRAPTORS 1223 Peregrine Falcon 3.00 Each CountRAPTORS 1223 Red-tailed Hawk 13.00 Each CountRAPTORS 1225.2 Great-horned Owl 2.00 Each CountRAPTORS 1225.2 Red-tailed Hawk 1.00 Each CountRAPTORS 1225.2 Unknown Buteo Species 1.00 Each CountRAPTORS 1270 Golden Eagle 6.00 Each CountRAPTORS 1270 Peregrine Falcon 2.00 Each CountRAPTORS 1310 Golden Eagle 20.00 Each CountRAPTORS 1310 Northern Goshawk 7.00 Each CountRAPTORS 1310 Peregrine Falcon 2.00 Each CountRAPTORS 1310 Red-tailed Hawk 4.00 Each CountRAPTORS 1320.05 Bald Eagle - Roosting Site 7.00 Each CountRAPTORS 1320.05 Ferruginous Hawk 1.00 Each CountRAPTORS 1320.05 Golden Eagle 2.00 Each CountRAPTORS 1320.05 Great-horned Owl 1.00 Each CountRAPTORS 1320.05 Northern Goshawk 5.00 Each CountRAPTORS 1320.05 Red-tailed Hawk 8.00 Each CountRAPTORS 1320.15 Golden Eagle 8.00 Each CountRAPTORS 1320.15 Prairie Falcon 1.00 Each CountRAPTORS 1320.15 Red-tailed Hawk 3.00 Each CountRAPTORS 1320.2 Red-tailed Hawk 1.00 Each CountRAPTORS 1321 Golden Eagle 8.00 Each CountRAPTORS 1321 Osprey 1.00 Each CountRAPTORS 1322 Golden Eagle 4.00 Each CountRAPTORS 1323 Golden Eagle 5.00 Each CountRAPTORS 1323 Northern Goshawk 2.00 Each CountRAPTORS 1323 Osprey 1.00 Each CountRAPTORS 1324 Common Raven 1.00 Each CountRAPTORS 1324 Northern Goshawk 2.00 Each CountRAPTORS 1325 Common Raven 1.00 Each CountRAPTORS 1325 Northern Goshawk 2.00 Each CountRAPTORS 1325.1 Cooper's Hawk 1.00 Each CountRAPTORS 1325.1 Golden Eagle 4.00 Each CountRAPTORS 1325.1 Northern Goshawk 5.00 Each CountRAPTORS 1325.1 Red-tailed Hawk 1.00 Each CountRAPTORS 1325.1 Unknown Raptor Species 1.00 Each CountRAPTORS 1325.2 Golden Eagle 1.00 Each CountRAPTORS 1330.1 American Kestrel 1.00 Each CountRAPTORS 1330.1 Common Raven 1.00 Each CountRAPTORS 1330.1 Golden Eagle 13.00 Each Count

Page 138: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

RAPTORS 1330.1 Long-eared Owl 1.00 Each CountRAPTORS 1410 Common Raven 1.00 Each CountRAPTORS 1450 Golden Eagle 1.00 Each CountRAPTORS 1450 Red-tailed Hawk 1.00 Each CountRAPTORS 1450 Unknown Raptor Species 1.00 Each CountRAPTORS 1460 Common Raven 12.00 Each CountRAPTORS 1460 Ferruginous Hawk 1.00 Each CountRAPTORS 1460 Golden Eagle 4.00 Each CountRAPTORS 1460 Prairie Falcon 1.00 Each CountRAPTORS 1460 Red-tailed Hawk 1.00 Each CountRAPTORS 1460 Unknown Raptor Species 15.00 Each CountRAPTORS 1470 Common Raven 5.00 Each CountRAPTORS 1470 Ferruginous Hawk 1.00 Each CountRAPTORS 1470 Golden Eagle 1.00 Each CountRAPTORS 1470 Great-horned Owl 1.00 Each CountRAPTORS 1470 Red-tailed Hawk 2.00 Each CountRAPTORS 1470 Unknown Raptor Species 11.00 Each CountRAPTORS 1480 Burrowing Owl 6.00 Each CountRAPTORS 1480 Common Raven 39.00 Each CountRAPTORS 1480 Ferruginous Hawk 7.00 Each CountRAPTORS 1480 Golden Eagle 11.00 Each CountRAPTORS 1480 Prairie Falcon 3.00 Each CountRAPTORS 1480 Red-tailed Hawk 5.00 Each CountRAPTORS 1480 Unknown Raptor Species 64.00 Each CountRAPTORS 1490 Common Raven 1.00 Each CountRAPTORS 1490 Unknown Raptor Species 4.00 Each CountRAPTORS 1490.05 Burrowing Owl 1.00 Each CountRAPTORS 1490.05 Ferruginous Hawk 8.00 Each CountRAPTORS 1490.05 Golden Eagle 3.00 Each CountRAPTORS 1490.05 Prairie Falcon 1.00 Each CountRAPTORS 1495 Common Raven 4.00 Each CountRAPTORS 1495 Ferruginous Hawk 2.00 Each CountRAPTORS 1495 Unknown Raptor Species 1.00 Each CountRAPTORS 1500 Common Raven 25.00 Each CountRAPTORS 1500 Ferruginous Hawk 11.00 Each CountRAPTORS 1500 Unknown Raptor Species 12.00 Each CountRAPTORS 1500.02 Burrowing Owl 1.00 Each CountRAPTORS 1500.02 Common Raven 24.00 Each CountRAPTORS 1500.02 Ferruginous Hawk 13.00 Each CountRAPTORS 1500.02 Golden Eagle 5.00 Each CountRAPTORS 1500.02 Prairie Falcon 2.00 Each CountRAPTORS 1500.02 Red-tailed Hawk 2.00 Each CountRAPTORS 1500.02 Unknown Raptor Species 14.00 Each CountRAPTORS 1500.05 Common Raven 3.00 Each CountRAPTORS 1500.05 Ferruginous Hawk 2.00 Each Count

Page 139: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

RAPTORS 1500.05 Golden Eagle 2.00 Each CountRAPTORS 1500.05 Long-eared Owl 1.00 Each CountRAPTORS 1500.05 Prairie Falcon 1.00 Each CountRAPTORS 1500.05 Red-tailed Hawk 2.00 Each CountRAPTORS 1500.05 Unknown Raptor Species 38.00 Each CountRAPTORS 1501.1 Common Raven 2.00 Each CountRAPTORS 1501.1 Osprey 1.00 Each CountRAPTORS 1501.1 Red-tailed Hawk 4.00 Each CountRAPTORS 1501.1 Unknown Raptor Species 11.00 Each CountRAPTORS 1502.5 Golden Eagle 1.00 Each CountRAPTORS 1502.5 Red-tailed Hawk 1.00 Each CountRAPTORS 1503.5 Unknown Raptor Species 1.00 Each CountRAPTORS 1504 Unknown Raptor Species 1.00 Each CountRAPTORS 1506 Golden Eagle 2.00 Each CountRAPTORS 1506 Osprey 1.00 Each CountRAPTORS 1506 Red-tailed Hawk 1.00 Each CountRAPTORS 1506 Unknown Raptor Species 5.00 Each CountRAPTORS 1510 Golden Eagle 1.00 Each CountRAPTORS 1520 American Kestrel 1.00 Each CountRAPTORS 1520 Golden Eagle 2.00 Each CountRAPTORS 1550.1 Great-horned Owl 1.00 Each CountRAPTORS 1660 Prairie Falcon 1.00 Each CountRAPTORS 1710 Peregrine Falcon 1.00 Each CountRAPTORS 1730 Peregrine Falcon 1.00 Each CountREC 1323.02 Campground#Aspen Grove Campground 0.10 Acres Construction DisturbanceREC 1323.02 Campground#Aspen Grove Campground 0.02 Acres Operation DisturbanceREC 1323.02 Fishing Access#Soldier Creek Dam Parking 0.49 Acres Construction DisturbanceREC 1323.02 Fishing Access#Soldier Creek Dam Parking 0.32 Acres Operation DisturbanceREC 1324 Snow Play Area#Unnamed Snow Play Area 42.91 Acres Construction DisturbanceREC 1324 Snow Play Area#Unnamed Snow Play Area 18.72 Acres Operation DisturbanceRIPARIAN 1030 Waterbody-100 ft buffer 0.48 Acres Construction DisturbanceRIPARIAN 1030 Waterbody-100 ft buffer 0.06 Acres Operation DisturbanceRIPARIAN 1030 Waterbody-300 ft buffer 0.94 Acres Construction DisturbanceRIPARIAN 1030 Waterbody-300 ft buffer 0.18 Acres Operation DisturbanceRIPARIAN 1040 Waterbody-100 ft buffer 0.14 Acres Construction DisturbanceRIPARIAN 1040 Waterbody-100 ft buffer 0.03 Acres Operation DisturbanceRIPARIAN 1040 Waterbody-300 ft buffer 0.32 Acres Construction DisturbanceRIPARIAN 1040 Waterbody-300 ft buffer 0.06 Acres Operation DisturbanceRIPARIAN 1100 Streams-100 ft buffer 0.04 Acres Construction DisturbanceRIPARIAN 1100 Streams-100 ft buffer 0.02 Acres Operation DisturbanceRIPARIAN 1100 Streams-300 ft buffer 0.13 Acres Construction DisturbanceRIPARIAN 1100 Streams-300 ft buffer 0.07 Acres Operation DisturbanceRIPARIAN 1100 Waterbody-100 ft buffer 0.10 Acres Construction DisturbanceRIPARIAN 1100 Waterbody-100 ft buffer 0.05 Acres Operation DisturbanceRIPARIAN 1100 Waterbody-300 ft buffer 0.24 Acres Construction Disturbance

Page 140: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

RIPARIAN 1100 Waterbody-300 ft buffer 0.12 Acres Operation DisturbanceRIPARIAN 1104 Waterbody-100 ft buffer 0.03 Acres Construction DisturbanceRIPARIAN 1104 Waterbody-100 ft buffer 0.01 Acres Operation DisturbanceRIPARIAN 1104 Waterbody-300 ft buffer 0.31 Acres Construction DisturbanceRIPARIAN 1104 Waterbody-300 ft buffer 0.08 Acres Operation DisturbanceRIPARIAN 1110 Waterbody-100 ft buffer 0.00 Acres Construction DisturbanceRIPARIAN 1110 Waterbody-100 ft buffer 0.00 Acres Operation DisturbanceRIPARIAN 1110 Waterbody-300 ft buffer 0.01 Acres Construction DisturbanceRIPARIAN 1110 Waterbody-300 ft buffer 0.00 Acres Operation DisturbanceRIPARIAN 1115 Waterbody-100 ft buffer 0.71 Acres Construction DisturbanceRIPARIAN 1115 Waterbody-100 ft buffer 0.14 Acres Operation DisturbanceRIPARIAN 1115 Waterbody-300 ft buffer 1.98 Acres Construction DisturbanceRIPARIAN 1115 Waterbody-300 ft buffer 0.40 Acres Operation DisturbanceRIPARIAN 1120 Waterbody-100 ft buffer 1.34 Acres Construction DisturbanceRIPARIAN 1120 Waterbody-100 ft buffer 0.30 Acres Operation DisturbanceRIPARIAN 1120 Waterbody-300 ft buffer 2.04 Acres Construction DisturbanceRIPARIAN 1120 Waterbody-300 ft buffer 0.46 Acres Operation DisturbanceRIPARIAN 1120.1 Waterbody-300 ft buffer 0.00 Acres Construction DisturbanceRIPARIAN 1120.1 Waterbody-300 ft buffer 0.00 Acres Operation DisturbanceRIPARIAN 1120.2 Waterbody-100 ft buffer 0.01 Acres Construction DisturbanceRIPARIAN 1120.2 Waterbody-100 ft buffer 0.00 Acres Operation DisturbanceRIPARIAN 1120.2 Waterbody-300 ft buffer 0.03 Acres Construction DisturbanceRIPARIAN 1120.2 Waterbody-300 ft buffer 0.01 Acres Operation DisturbanceRIPARIAN 1187 Streams-100 ft buffer 1.94 Acres Construction DisturbanceRIPARIAN 1187 Streams-100 ft buffer 0.78 Acres Operation DisturbanceRIPARIAN 1187 Streams-300 ft buffer 3.57 Acres Construction DisturbanceRIPARIAN 1187 Streams-300 ft buffer 1.43 Acres Operation DisturbanceRIPARIAN 1187 Waterbody-100 ft buffer 0.00 Acres Construction DisturbanceRIPARIAN 1187 Waterbody-100 ft buffer 0.00 Acres Operation DisturbanceRIPARIAN 1187 Waterbody-300 ft buffer 0.01 Acres Construction DisturbanceRIPARIAN 1187 Waterbody-300 ft buffer 0.01 Acres Operation DisturbanceRIPARIAN 1190 Streams-100 ft buffer 12.61 Acres Construction DisturbanceRIPARIAN 1190 Streams-100 ft buffer 4.53 Acres Operation DisturbanceRIPARIAN 1190 Streams-300 ft buffer 32.16 Acres Construction DisturbanceRIPARIAN 1190 Streams-300 ft buffer 11.32 Acres Operation DisturbanceRIPARIAN 1190 Waterbody-100 ft buffer 1.62 Acres Construction DisturbanceRIPARIAN 1190 Waterbody-100 ft buffer 0.53 Acres Operation DisturbanceRIPARIAN 1190 Waterbody-300 ft buffer 5.82 Acres Construction DisturbanceRIPARIAN 1190 Waterbody-300 ft buffer 1.90 Acres Operation DisturbanceRIPARIAN 1210 Streams-100 ft buffer 0.29 Acres Construction DisturbanceRIPARIAN 1210 Streams-100 ft buffer 0.11 Acres Operation DisturbanceRIPARIAN 1210 Streams-300 ft buffer 0.84 Acres Construction DisturbanceRIPARIAN 1210 Streams-300 ft buffer 0.31 Acres Operation DisturbanceRIPARIAN 1210 Waterbody-100 ft buffer 0.10 Acres Construction DisturbanceRIPARIAN 1210 Waterbody-100 ft buffer 0.02 Acres Operation Disturbance

Page 141: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

RIPARIAN 1210 Waterbody-300 ft buffer 0.35 Acres Construction DisturbanceRIPARIAN 1210 Waterbody-300 ft buffer 0.07 Acres Operation DisturbanceRIPARIAN 1215 Streams-100 ft buffer 0.10 Acres Construction DisturbanceRIPARIAN 1215 Streams-100 ft buffer 0.03 Acres Operation DisturbanceRIPARIAN 1215 Streams-300 ft buffer 0.32 Acres Construction DisturbanceRIPARIAN 1215 Streams-300 ft buffer 0.09 Acres Operation DisturbanceRIPARIAN 1215 Waterbody-100 ft buffer 0.01 Acres Construction DisturbanceRIPARIAN 1215 Waterbody-100 ft buffer 0.00 Acres Operation DisturbanceRIPARIAN 1215 Waterbody-300 ft buffer 0.03 Acres Construction DisturbanceRIPARIAN 1215 Waterbody-300 ft buffer 0.01 Acres Operation DisturbanceRIPARIAN 1217.01 Streams-100 ft buffer 3.31 Acres Construction DisturbanceRIPARIAN 1217.01 Streams-100 ft buffer 1.46 Acres Operation DisturbanceRIPARIAN 1217.01 Streams-300 ft buffer 7.22 Acres Construction DisturbanceRIPARIAN 1217.01 Streams-300 ft buffer 3.19 Acres Operation DisturbanceRIPARIAN 1217.01 Waterbody-100 ft buffer 0.01 Acres Construction DisturbanceRIPARIAN 1217.01 Waterbody-100 ft buffer 0.00 Acres Operation DisturbanceRIPARIAN 1217.01 Waterbody-300 ft buffer 0.04 Acres Construction DisturbanceRIPARIAN 1217.01 Waterbody-300 ft buffer 0.02 Acres Operation DisturbanceRIPARIAN 1217.02 Streams-100 ft buffer 1.19 Acres Construction DisturbanceRIPARIAN 1217.02 Streams-100 ft buffer 0.69 Acres Operation DisturbanceRIPARIAN 1217.02 Streams-300 ft buffer 3.54 Acres Construction DisturbanceRIPARIAN 1217.02 Streams-300 ft buffer 2.04 Acres Operation DisturbanceRIPARIAN 1217.02 Waterbody-100 ft buffer 0.05 Acres Construction DisturbanceRIPARIAN 1217.02 Waterbody-100 ft buffer 0.03 Acres Operation DisturbanceRIPARIAN 1217.02 Waterbody-300 ft buffer 0.25 Acres Construction DisturbanceRIPARIAN 1217.02 Waterbody-300 ft buffer 0.15 Acres Operation DisturbanceRIPARIAN 1217.051 Streams-100 ft buffer 2.87 Acres Construction DisturbanceRIPARIAN 1217.051 Streams-100 ft buffer 1.20 Acres Operation DisturbanceRIPARIAN 1217.051 Streams-300 ft buffer 8.11 Acres Construction DisturbanceRIPARIAN 1217.051 Streams-300 ft buffer 3.37 Acres Operation DisturbanceRIPARIAN 1217.051 Waterbody-100 ft buffer 0.16 Acres Construction DisturbanceRIPARIAN 1217.051 Waterbody-100 ft buffer 0.06 Acres Operation DisturbanceRIPARIAN 1217.051 Waterbody-300 ft buffer 0.72 Acres Construction DisturbanceRIPARIAN 1217.051 Waterbody-300 ft buffer 0.29 Acres Operation DisturbanceRIPARIAN 1217.052 Streams-100 ft buffer 4.64 Acres Construction DisturbanceRIPARIAN 1217.052 Streams-100 ft buffer 3.02 Acres Operation DisturbanceRIPARIAN 1217.052 Streams-300 ft buffer 13.47 Acres Construction DisturbanceRIPARIAN 1217.052 Streams-300 ft buffer 8.79 Acres Operation DisturbanceRIPARIAN 1217.052 Waterbody-100 ft buffer 0.08 Acres Construction DisturbanceRIPARIAN 1217.052 Waterbody-100 ft buffer 0.05 Acres Operation DisturbanceRIPARIAN 1217.052 Waterbody-300 ft buffer 0.39 Acres Construction DisturbanceRIPARIAN 1217.052 Waterbody-300 ft buffer 0.22 Acres Operation DisturbanceRIPARIAN 1217.1 Streams-100 ft buffer 2.90 Acres Construction DisturbanceRIPARIAN 1217.1 Streams-100 ft buffer 1.55 Acres Operation DisturbanceRIPARIAN 1217.1 Streams-300 ft buffer 9.20 Acres Construction Disturbance

Page 142: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

RIPARIAN 1217.1 Streams-300 ft buffer 4.52 Acres Operation DisturbanceRIPARIAN 1217.1 Waterbody-100 ft buffer 0.03 Acres Construction DisturbanceRIPARIAN 1217.1 Waterbody-100 ft buffer 0.02 Acres Operation DisturbanceRIPARIAN 1217.1 Waterbody-300 ft buffer 0.11 Acres Construction DisturbanceRIPARIAN 1217.1 Waterbody-300 ft buffer 0.07 Acres Operation DisturbanceRIPARIAN 1217.15 Streams-100 ft buffer 4.63 Acres Construction DisturbanceRIPARIAN 1217.15 Streams-100 ft buffer 2.62 Acres Operation DisturbanceRIPARIAN 1217.15 Streams-300 ft buffer 14.38 Acres Construction DisturbanceRIPARIAN 1217.15 Streams-300 ft buffer 7.92 Acres Operation DisturbanceRIPARIAN 1217.15 Waterbody-100 ft buffer 0.35 Acres Construction DisturbanceRIPARIAN 1217.15 Waterbody-100 ft buffer 0.22 Acres Operation DisturbanceRIPARIAN 1217.15 Waterbody-300 ft buffer 1.44 Acres Construction DisturbanceRIPARIAN 1217.15 Waterbody-300 ft buffer 0.87 Acres Operation DisturbanceRIPARIAN 1218 Streams-100 ft buffer 2.01 Acres Construction DisturbanceRIPARIAN 1218 Streams-100 ft buffer 1.47 Acres Operation DisturbanceRIPARIAN 1218 Streams-300 ft buffer 6.16 Acres Construction DisturbanceRIPARIAN 1218 Streams-300 ft buffer 4.45 Acres Operation DisturbanceRIPARIAN 1219.2 Streams-100 ft buffer 2.74 Acres Construction DisturbanceRIPARIAN 1219.2 Streams-100 ft buffer 1.84 Acres Operation DisturbanceRIPARIAN 1219.2 Streams-300 ft buffer 8.64 Acres Construction DisturbanceRIPARIAN 1219.2 Streams-300 ft buffer 5.74 Acres Operation DisturbanceRIPARIAN 1219.2 Waterbody-100 ft buffer 0.04 Acres Construction DisturbanceRIPARIAN 1219.2 Waterbody-100 ft buffer 0.02 Acres Operation DisturbanceRIPARIAN 1219.2 Waterbody-300 ft buffer 0.32 Acres Construction DisturbanceRIPARIAN 1219.2 Waterbody-300 ft buffer 0.15 Acres Operation DisturbanceRIPARIAN 1219.3 Streams-100 ft buffer 0.19 Acres Construction DisturbanceRIPARIAN 1219.3 Streams-100 ft buffer 0.04 Acres Operation DisturbanceRIPARIAN 1219.3 Streams-300 ft buffer 0.45 Acres Construction DisturbanceRIPARIAN 1219.3 Streams-300 ft buffer 0.09 Acres Operation DisturbanceRIPARIAN 1219.3 Waterbody-100 ft buffer 0.15 Acres Construction DisturbanceRIPARIAN 1219.3 Waterbody-100 ft buffer 0.03 Acres Operation DisturbanceRIPARIAN 1219.3 Waterbody-300 ft buffer 0.53 Acres Construction DisturbanceRIPARIAN 1219.3 Waterbody-300 ft buffer 0.11 Acres Operation DisturbanceRIPARIAN 1219.4 Streams-100 ft buffer 0.14 Acres Construction DisturbanceRIPARIAN 1219.4 Streams-100 ft buffer 0.09 Acres Operation DisturbanceRIPARIAN 1219.4 Streams-300 ft buffer 0.43 Acres Construction DisturbanceRIPARIAN 1219.4 Streams-300 ft buffer 0.27 Acres Operation DisturbanceRIPARIAN 1219.45 Streams-100 ft buffer 0.35 Acres Construction DisturbanceRIPARIAN 1219.45 Streams-100 ft buffer 0.23 Acres Operation DisturbanceRIPARIAN 1219.45 Streams-300 ft buffer 0.94 Acres Construction DisturbanceRIPARIAN 1219.45 Streams-300 ft buffer 0.59 Acres Operation DisturbanceRIPARIAN 1219.5 Streams-100 ft buffer 5.72 Acres Construction DisturbanceRIPARIAN 1219.5 Streams-100 ft buffer 2.95 Acres Operation DisturbanceRIPARIAN 1219.5 Streams-300 ft buffer 16.12 Acres Construction DisturbanceRIPARIAN 1219.5 Streams-300 ft buffer 8.53 Acres Operation Disturbance

Page 143: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

RIPARIAN 1219.5 Waterbody-100 ft buffer 0.21 Acres Construction DisturbanceRIPARIAN 1219.5 Waterbody-100 ft buffer 0.13 Acres Operation DisturbanceRIPARIAN 1219.5 Waterbody-300 ft buffer 0.59 Acres Construction DisturbanceRIPARIAN 1219.5 Waterbody-300 ft buffer 0.35 Acres Operation DisturbanceRIPARIAN 1219.6 Streams-100 ft buffer 1.25 Acres Construction DisturbanceRIPARIAN 1219.6 Streams-100 ft buffer 0.49 Acres Operation DisturbanceRIPARIAN 1219.6 Streams-300 ft buffer 3.86 Acres Construction DisturbanceRIPARIAN 1219.6 Streams-300 ft buffer 1.47 Acres Operation DisturbanceRIPARIAN 1219.6 Waterbody-100 ft buffer 0.01 Acres Construction DisturbanceRIPARIAN 1219.6 Waterbody-100 ft buffer 0.01 Acres Operation DisturbanceRIPARIAN 1219.6 Waterbody-300 ft buffer 0.07 Acres Construction DisturbanceRIPARIAN 1219.6 Waterbody-300 ft buffer 0.04 Acres Operation DisturbanceRIPARIAN 1220 Streams-100 ft buffer 6.21 Acres Construction DisturbanceRIPARIAN 1220 Streams-100 ft buffer 1.93 Acres Operation DisturbanceRIPARIAN 1220 Streams-300 ft buffer 14.28 Acres Construction DisturbanceRIPARIAN 1220 Streams-300 ft buffer 4.53 Acres Operation DisturbanceRIPARIAN 1220 Waterbody-100 ft buffer 1.51 Acres Construction DisturbanceRIPARIAN 1220 Waterbody-100 ft buffer 0.57 Acres Operation DisturbanceRIPARIAN 1220 Waterbody-300 ft buffer 3.15 Acres Construction DisturbanceRIPARIAN 1220 Waterbody-300 ft buffer 1.04 Acres Operation DisturbanceRIPARIAN 1222.05 Streams-100 ft buffer 3.98 Acres Construction DisturbanceRIPARIAN 1222.05 Streams-100 ft buffer 0.88 Acres Operation DisturbanceRIPARIAN 1222.05 Streams-300 ft buffer 8.67 Acres Construction DisturbanceRIPARIAN 1222.05 Streams-300 ft buffer 1.99 Acres Operation DisturbanceRIPARIAN 1222.05 Waterbody-100 ft buffer 0.04 Acres Construction DisturbanceRIPARIAN 1222.05 Waterbody-100 ft buffer 0.01 Acres Operation DisturbanceRIPARIAN 1222.05 Waterbody-300 ft buffer 0.20 Acres Construction DisturbanceRIPARIAN 1222.05 Waterbody-300 ft buffer 0.06 Acres Operation DisturbanceRIPARIAN 1222.3 Streams-100 ft buffer 0.64 Acres Construction DisturbanceRIPARIAN 1222.3 Streams-100 ft buffer 0.25 Acres Operation DisturbanceRIPARIAN 1222.3 Streams-300 ft buffer 1.92 Acres Construction DisturbanceRIPARIAN 1222.3 Streams-300 ft buffer 0.75 Acres Operation DisturbanceRIPARIAN 1222.3 Waterbody-100 ft buffer 0.02 Acres Construction DisturbanceRIPARIAN 1222.3 Waterbody-100 ft buffer 0.01 Acres Operation DisturbanceRIPARIAN 1222.3 Waterbody-300 ft buffer 0.06 Acres Construction DisturbanceRIPARIAN 1222.3 Waterbody-300 ft buffer 0.03 Acres Operation DisturbanceRIPARIAN 1223 Streams-100 ft buffer 1.46 Acres Construction DisturbanceRIPARIAN 1223 Streams-100 ft buffer 0.65 Acres Operation DisturbanceRIPARIAN 1223 Streams-300 ft buffer 4.33 Acres Construction DisturbanceRIPARIAN 1223 Streams-300 ft buffer 1.88 Acres Operation DisturbanceRIPARIAN 1223 Waterbody-100 ft buffer 0.08 Acres Construction DisturbanceRIPARIAN 1223 Waterbody-100 ft buffer 0.04 Acres Operation DisturbanceRIPARIAN 1223 Waterbody-300 ft buffer 0.19 Acres Construction DisturbanceRIPARIAN 1223 Waterbody-300 ft buffer 0.10 Acres Operation DisturbanceRIPARIAN 1225.2 Streams-100 ft buffer 0.53 Acres Construction Disturbance

Page 144: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

RIPARIAN 1225.2 Streams-100 ft buffer 0.16 Acres Operation DisturbanceRIPARIAN 1225.2 Streams-300 ft buffer 1.37 Acres Construction DisturbanceRIPARIAN 1225.2 Streams-300 ft buffer 0.42 Acres Operation DisturbanceRIPARIAN 1270 Waterbody-100 ft buffer 0.01 Acres Construction DisturbanceRIPARIAN 1270 Waterbody-100 ft buffer 0.00 Acres Operation DisturbanceRIPARIAN 1270 Waterbody-300 ft buffer 0.03 Acres Construction DisturbanceRIPARIAN 1270 Waterbody-300 ft buffer 0.01 Acres Operation DisturbanceRIPARIAN 1310 Streams-100 ft buffer 6.73 Acres Construction DisturbanceRIPARIAN 1310 Streams-100 ft buffer 4.27 Acres Operation DisturbanceRIPARIAN 1310 Streams-300 ft buffer 19.56 Acres Construction DisturbanceRIPARIAN 1310 Streams-300 ft buffer 12.37 Acres Operation DisturbanceRIPARIAN 1310 Waterbody-100 ft buffer 0.58 Acres Construction DisturbanceRIPARIAN 1310 Waterbody-100 ft buffer 0.38 Acres Operation DisturbanceRIPARIAN 1310 Waterbody-300 ft buffer 1.50 Acres Construction DisturbanceRIPARIAN 1310 Waterbody-300 ft buffer 0.98 Acres Operation DisturbanceRIPARIAN 1320.05 Streams-100 ft buffer 3.71 Acres Construction DisturbanceRIPARIAN 1320.05 Streams-100 ft buffer 1.09 Acres Operation DisturbanceRIPARIAN 1320.05 Streams-300 ft buffer 9.01 Acres Construction DisturbanceRIPARIAN 1320.05 Streams-300 ft buffer 2.64 Acres Operation DisturbanceRIPARIAN 1320.05 Waterbody-100 ft buffer 1.57 Acres Construction DisturbanceRIPARIAN 1320.05 Waterbody-100 ft buffer 0.42 Acres Operation DisturbanceRIPARIAN 1320.05 Waterbody-300 ft buffer 2.83 Acres Construction DisturbanceRIPARIAN 1320.05 Waterbody-300 ft buffer 0.71 Acres Operation DisturbanceRIPARIAN 1320.15 Streams-100 ft buffer 6.18 Acres Construction DisturbanceRIPARIAN 1320.15 Streams-100 ft buffer 4.24 Acres Operation DisturbanceRIPARIAN 1320.15 Streams-300 ft buffer 17.82 Acres Construction DisturbanceRIPARIAN 1320.15 Streams-300 ft buffer 12.28 Acres Operation DisturbanceRIPARIAN 1320.15 Waterbody-100 ft buffer 0.11 Acres Construction DisturbanceRIPARIAN 1320.15 Waterbody-100 ft buffer 0.08 Acres Operation DisturbanceRIPARIAN 1320.15 Waterbody-300 ft buffer 0.48 Acres Construction DisturbanceRIPARIAN 1320.15 Waterbody-300 ft buffer 0.34 Acres Operation DisturbanceRIPARIAN 1320.2 Streams-100 ft buffer 1.30 Acres Construction DisturbanceRIPARIAN 1320.2 Streams-100 ft buffer 0.87 Acres Operation DisturbanceRIPARIAN 1320.2 Streams-300 ft buffer 3.80 Acres Construction DisturbanceRIPARIAN 1320.2 Streams-300 ft buffer 2.57 Acres Operation DisturbanceRIPARIAN 1320.2 Waterbody-100 ft buffer 0.01 Acres Construction DisturbanceRIPARIAN 1320.2 Waterbody-100 ft buffer 0.01 Acres Operation DisturbanceRIPARIAN 1320.2 Waterbody-300 ft buffer 0.05 Acres Construction DisturbanceRIPARIAN 1320.2 Waterbody-300 ft buffer 0.04 Acres Operation DisturbanceRIPARIAN 1320.21 Streams-100 ft buffer 0.10 Acres Construction DisturbanceRIPARIAN 1320.21 Streams-100 ft buffer 0.08 Acres Operation DisturbanceRIPARIAN 1320.21 Streams-300 ft buffer 0.30 Acres Construction DisturbanceRIPARIAN 1320.21 Streams-300 ft buffer 0.22 Acres Operation DisturbanceRIPARIAN 1324 Streams-100 ft buffer 0.06 Acres Construction DisturbanceRIPARIAN 1324 Streams-100 ft buffer 0.05 Acres Operation Disturbance

Page 145: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

RIPARIAN 1324 Streams-300 ft buffer 0.31 Acres Construction DisturbanceRIPARIAN 1324 Streams-300 ft buffer 0.22 Acres Operation DisturbanceRIPARIAN 1324.2 Streams-100 ft buffer 0.07 Acres Construction DisturbanceRIPARIAN 1324.2 Streams-100 ft buffer 0.05 Acres Operation DisturbanceRIPARIAN 1324.2 Streams-300 ft buffer 0.31 Acres Construction DisturbanceRIPARIAN 1324.2 Streams-300 ft buffer 0.22 Acres Operation DisturbanceRIPARIAN 1324.4 Streams-100 ft buffer 0.07 Acres Construction DisturbanceRIPARIAN 1324.4 Streams-100 ft buffer 0.05 Acres Operation DisturbanceRIPARIAN 1324.4 Streams-300 ft buffer 0.32 Acres Construction DisturbanceRIPARIAN 1324.4 Streams-300 ft buffer 0.23 Acres Operation DisturbanceRIPARIAN 1325 Streams-100 ft buffer 2.25 Acres Construction DisturbanceRIPARIAN 1325 Streams-100 ft buffer 1.45 Acres Operation DisturbanceRIPARIAN 1325 Streams-300 ft buffer 7.34 Acres Construction DisturbanceRIPARIAN 1325 Streams-300 ft buffer 4.71 Acres Operation DisturbanceRIPARIAN 1325.1 Streams-100 ft buffer 12.16 Acres Construction DisturbanceRIPARIAN 1325.1 Streams-100 ft buffer 3.04 Acres Operation DisturbanceRIPARIAN 1325.1 Streams-300 ft buffer 29.99 Acres Construction DisturbanceRIPARIAN 1325.1 Streams-300 ft buffer 8.12 Acres Operation DisturbanceRIPARIAN 1325.1 Waterbody-100 ft buffer 2.70 Acres Construction DisturbanceRIPARIAN 1325.1 Waterbody-100 ft buffer 1.26 Acres Operation DisturbanceRIPARIAN 1325.1 Waterbody-300 ft buffer 5.53 Acres Construction DisturbanceRIPARIAN 1325.1 Waterbody-300 ft buffer 2.54 Acres Operation DisturbanceRIPARIAN 1325.2 Streams-100 ft buffer 0.48 Acres Construction DisturbanceRIPARIAN 1325.2 Streams-100 ft buffer 0.26 Acres Operation DisturbanceRIPARIAN 1325.2 Streams-300 ft buffer 1.63 Acres Construction DisturbanceRIPARIAN 1325.2 Streams-300 ft buffer 0.83 Acres Operation DisturbanceRIPARIAN 1330.1 Streams-100 ft buffer 9.23 Acres Construction DisturbanceRIPARIAN 1330.1 Streams-100 ft buffer 4.37 Acres Operation DisturbanceRIPARIAN 1330.1 Streams-300 ft buffer 26.50 Acres Construction DisturbanceRIPARIAN 1330.1 Streams-300 ft buffer 12.33 Acres Operation DisturbanceRIPARIAN 1330.1 Waterbody-100 ft buffer 1.39 Acres Construction DisturbanceRIPARIAN 1330.1 Waterbody-100 ft buffer 0.76 Acres Operation DisturbanceRIPARIAN 1330.1 Waterbody-300 ft buffer 2.83 Acres Construction DisturbanceRIPARIAN 1330.1 Waterbody-300 ft buffer 1.48 Acres Operation DisturbanceRIPARIAN 1340 Streams-100 ft buffer 0.44 Acres Construction DisturbanceRIPARIAN 1340 Streams-100 ft buffer 0.20 Acres Operation DisturbanceRIPARIAN 1340 Streams-300 ft buffer 1.35 Acres Construction DisturbanceRIPARIAN 1340 Streams-300 ft buffer 0.61 Acres Operation DisturbanceRIPARIAN 1340 Waterbody-100 ft buffer 0.73 Acres Construction DisturbanceRIPARIAN 1340 Waterbody-100 ft buffer 0.29 Acres Operation DisturbanceRIPARIAN 1340 Waterbody-300 ft buffer 1.83 Acres Construction DisturbanceRIPARIAN 1340 Waterbody-300 ft buffer 0.79 Acres Operation DisturbanceRIPARIAN 1350 Waterbody-100 ft buffer 0.02 Acres Construction DisturbanceRIPARIAN 1350 Waterbody-100 ft buffer 0.01 Acres Operation DisturbanceRIPARIAN 1350 Waterbody-300 ft buffer 0.10 Acres Construction Disturbance

Page 146: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

RIPARIAN 1350 Waterbody-300 ft buffer 0.07 Acres Operation DisturbanceRIPARIAN 1360 Waterbody-100 ft buffer 0.00 Acres Construction DisturbanceRIPARIAN 1360 Waterbody-100 ft buffer 0.00 Acres Operation DisturbanceRIPARIAN 1360 Waterbody-300 ft buffer 0.02 Acres Construction DisturbanceRIPARIAN 1360 Waterbody-300 ft buffer 0.01 Acres Operation DisturbanceRIPARIAN 1370 Streams-100 ft buffer 0.49 Acres Construction DisturbanceRIPARIAN 1370 Streams-100 ft buffer 0.23 Acres Operation DisturbanceRIPARIAN 1370 Streams-300 ft buffer 1.14 Acres Construction DisturbanceRIPARIAN 1370 Streams-300 ft buffer 0.53 Acres Operation DisturbanceRIPARIAN 1370 Waterbody-100 ft buffer 0.01 Acres Construction DisturbanceRIPARIAN 1370 Waterbody-100 ft buffer 0.01 Acres Operation DisturbanceRIPARIAN 1370 Waterbody-300 ft buffer 0.07 Acres Construction DisturbanceRIPARIAN 1370 Waterbody-300 ft buffer 0.04 Acres Operation DisturbanceRIPARIAN 1380 Streams-100 ft buffer 0.93 Acres Construction DisturbanceRIPARIAN 1380 Streams-100 ft buffer 0.33 Acres Operation DisturbanceRIPARIAN 1380 Streams-300 ft buffer 2.22 Acres Construction DisturbanceRIPARIAN 1380 Streams-300 ft buffer 0.79 Acres Operation DisturbanceRIPARIAN 1380 Waterbody-100 ft buffer 0.02 Acres Construction DisturbanceRIPARIAN 1380 Waterbody-100 ft buffer 0.01 Acres Operation DisturbanceRIPARIAN 1380 Waterbody-300 ft buffer 0.07 Acres Construction DisturbanceRIPARIAN 1380 Waterbody-300 ft buffer 0.03 Acres Operation DisturbanceRIPARIAN 1400 Waterbody-100 ft buffer 0.01 Acres Construction DisturbanceRIPARIAN 1400 Waterbody-100 ft buffer 0.00 Acres Operation DisturbanceRIPARIAN 1400 Waterbody-300 ft buffer 0.06 Acres Construction DisturbanceRIPARIAN 1400 Waterbody-300 ft buffer 0.02 Acres Operation DisturbanceRIPARIAN 1410 Streams-300 ft buffer 0.00 Acres Construction DisturbanceRIPARIAN 1410 Streams-300 ft buffer 0.00 Acres Operation DisturbanceRIPARIAN 1410 Waterbody-100 ft buffer 2.56 Acres Construction DisturbanceRIPARIAN 1410 Waterbody-100 ft buffer 0.86 Acres Operation DisturbanceRIPARIAN 1410 Waterbody-300 ft buffer 3.59 Acres Construction DisturbanceRIPARIAN 1410 Waterbody-300 ft buffer 1.16 Acres Operation DisturbanceRIPARIAN 1440 Waterbody-100 ft buffer 0.17 Acres Construction DisturbanceRIPARIAN 1440 Waterbody-100 ft buffer 0.06 Acres Operation DisturbanceRIPARIAN 1440 Waterbody-300 ft buffer 0.31 Acres Construction DisturbanceRIPARIAN 1440 Waterbody-300 ft buffer 0.12 Acres Operation DisturbanceRIPARIAN 1450 Waterbody-100 ft buffer 0.01 Acres Construction DisturbanceRIPARIAN 1450 Waterbody-100 ft buffer 0.00 Acres Operation DisturbanceRIPARIAN 1450 Waterbody-300 ft buffer 0.03 Acres Construction DisturbanceRIPARIAN 1450 Waterbody-300 ft buffer 0.01 Acres Operation DisturbanceRIPARIAN 1460 Waterbody-100 ft buffer 0.03 Acres Construction DisturbanceRIPARIAN 1460 Waterbody-100 ft buffer 0.01 Acres Operation DisturbanceRIPARIAN 1460 Waterbody-300 ft buffer 0.15 Acres Construction DisturbanceRIPARIAN 1460 Waterbody-300 ft buffer 0.06 Acres Operation DisturbanceRIPARIAN 1470 Waterbody-100 ft buffer 0.02 Acres Construction DisturbanceRIPARIAN 1470 Waterbody-100 ft buffer 0.00 Acres Operation Disturbance

Page 147: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

RIPARIAN 1470 Waterbody-300 ft buffer 0.06 Acres Construction DisturbanceRIPARIAN 1470 Waterbody-300 ft buffer 0.02 Acres Operation DisturbanceRIPARIAN 1480 Streams-100 ft buffer 0.09 Acres Construction DisturbanceRIPARIAN 1480 Streams-100 ft buffer 0.03 Acres Operation DisturbanceRIPARIAN 1480 Streams-300 ft buffer 0.28 Acres Construction DisturbanceRIPARIAN 1480 Streams-300 ft buffer 0.11 Acres Operation DisturbanceRIPARIAN 1480 Waterbody-100 ft buffer 0.31 Acres Construction DisturbanceRIPARIAN 1480 Waterbody-100 ft buffer 0.12 Acres Operation DisturbanceRIPARIAN 1480 Waterbody-300 ft buffer 0.82 Acres Construction DisturbanceRIPARIAN 1480 Waterbody-300 ft buffer 0.22 Acres Operation DisturbanceRIPARIAN 1490 Waterbody-100 ft buffer 0.00 Acres Construction DisturbanceRIPARIAN 1490 Waterbody-100 ft buffer 0.00 Acres Operation DisturbanceRIPARIAN 1490 Waterbody-300 ft buffer 0.03 Acres Construction DisturbanceRIPARIAN 1490 Waterbody-300 ft buffer 0.01 Acres Operation DisturbanceRIPARIAN 1490.05 Waterbody-100 ft buffer 0.01 Acres Construction DisturbanceRIPARIAN 1490.05 Waterbody-100 ft buffer 0.00 Acres Operation DisturbanceRIPARIAN 1490.05 Waterbody-300 ft buffer 0.04 Acres Construction DisturbanceRIPARIAN 1490.05 Waterbody-300 ft buffer 0.01 Acres Operation DisturbanceRIPARIAN 1495 Waterbody-100 ft buffer 0.02 Acres Construction DisturbanceRIPARIAN 1495 Waterbody-100 ft buffer 0.00 Acres Operation DisturbanceRIPARIAN 1495 Waterbody-300 ft buffer 0.07 Acres Construction DisturbanceRIPARIAN 1495 Waterbody-300 ft buffer 0.01 Acres Operation DisturbanceRIPARIAN 1500 Waterbody-100 ft buffer 0.06 Acres Construction DisturbanceRIPARIAN 1500 Waterbody-100 ft buffer 0.02 Acres Operation DisturbanceRIPARIAN 1500 Waterbody-300 ft buffer 0.19 Acres Construction DisturbanceRIPARIAN 1500 Waterbody-300 ft buffer 0.07 Acres Operation DisturbanceRIPARIAN 1500.02 Streams-100 ft buffer 0.05 Acres Construction DisturbanceRIPARIAN 1500.02 Streams-100 ft buffer 0.02 Acres Operation DisturbanceRIPARIAN 1500.02 Streams-300 ft buffer 0.17 Acres Construction DisturbanceRIPARIAN 1500.02 Streams-300 ft buffer 0.06 Acres Operation DisturbanceRIPARIAN 1500.02 Waterbody-100 ft buffer 0.05 Acres Construction DisturbanceRIPARIAN 1500.02 Waterbody-100 ft buffer 0.02 Acres Operation DisturbanceRIPARIAN 1500.02 Waterbody-300 ft buffer 0.19 Acres Construction DisturbanceRIPARIAN 1500.02 Waterbody-300 ft buffer 0.07 Acres Operation DisturbanceRIPARIAN 1500.05 Waterbody-100 ft buffer 0.45 Acres Construction DisturbanceRIPARIAN 1500.05 Waterbody-100 ft buffer 0.26 Acres Operation DisturbanceRIPARIAN 1500.05 Waterbody-300 ft buffer 0.64 Acres Construction DisturbanceRIPARIAN 1500.05 Waterbody-300 ft buffer 0.37 Acres Operation DisturbanceRIPARIAN 1501.1 Streams-100 ft buffer 0.68 Acres Construction DisturbanceRIPARIAN 1501.1 Streams-100 ft buffer 0.40 Acres Operation DisturbanceRIPARIAN 1501.1 Streams-300 ft buffer 2.03 Acres Construction DisturbanceRIPARIAN 1501.1 Streams-300 ft buffer 1.22 Acres Operation DisturbanceRIPARIAN 1501.1 Waterbody-100 ft buffer 0.12 Acres Construction DisturbanceRIPARIAN 1501.1 Waterbody-100 ft buffer 0.08 Acres Operation DisturbanceRIPARIAN 1501.1 Waterbody-300 ft buffer 0.46 Acres Construction Disturbance

Page 148: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

RIPARIAN 1501.1 Waterbody-300 ft buffer 0.29 Acres Operation DisturbanceRIPARIAN 1502.5 Streams-100 ft buffer 0.40 Acres Construction DisturbanceRIPARIAN 1502.5 Streams-100 ft buffer 0.20 Acres Operation DisturbanceRIPARIAN 1502.5 Streams-300 ft buffer 1.26 Acres Construction DisturbanceRIPARIAN 1502.5 Streams-300 ft buffer 0.61 Acres Operation DisturbanceRIPARIAN 1502.5 Waterbody-100 ft buffer 0.01 Acres Construction DisturbanceRIPARIAN 1502.5 Waterbody-100 ft buffer 0.00 Acres Operation DisturbanceRIPARIAN 1502.5 Waterbody-300 ft buffer 0.04 Acres Construction DisturbanceRIPARIAN 1502.5 Waterbody-300 ft buffer 0.02 Acres Operation DisturbanceRIPARIAN 1503 Streams-100 ft buffer 0.26 Acres Construction DisturbanceRIPARIAN 1503 Streams-100 ft buffer 0.12 Acres Operation DisturbanceRIPARIAN 1503 Streams-300 ft buffer 0.80 Acres Construction DisturbanceRIPARIAN 1503 Streams-300 ft buffer 0.37 Acres Operation DisturbanceRIPARIAN 1503 Waterbody-100 ft buffer 0.02 Acres Construction DisturbanceRIPARIAN 1503 Waterbody-100 ft buffer 0.01 Acres Operation DisturbanceRIPARIAN 1503 Waterbody-300 ft buffer 0.08 Acres Construction DisturbanceRIPARIAN 1503 Waterbody-300 ft buffer 0.05 Acres Operation DisturbanceRIPARIAN 1504 Streams-100 ft buffer 0.35 Acres Construction DisturbanceRIPARIAN 1504 Streams-100 ft buffer 0.17 Acres Operation DisturbanceRIPARIAN 1504 Streams-300 ft buffer 1.01 Acres Construction DisturbanceRIPARIAN 1504 Streams-300 ft buffer 0.49 Acres Operation DisturbanceRIPARIAN 1505 Streams-100 ft buffer 0.32 Acres Construction DisturbanceRIPARIAN 1505 Streams-100 ft buffer 0.23 Acres Operation DisturbanceRIPARIAN 1505 Streams-300 ft buffer 1.06 Acres Construction DisturbanceRIPARIAN 1505 Streams-300 ft buffer 0.73 Acres Operation DisturbanceRIPARIAN 1505 Waterbody-100 ft buffer 0.15 Acres Construction DisturbanceRIPARIAN 1505 Waterbody-100 ft buffer 0.11 Acres Operation DisturbanceRIPARIAN 1505 Waterbody-300 ft buffer 0.75 Acres Construction DisturbanceRIPARIAN 1505 Waterbody-300 ft buffer 0.54 Acres Operation DisturbanceRIPARIAN 1506 Streams-100 ft buffer 5.44 Acres Construction DisturbanceRIPARIAN 1506 Streams-100 ft buffer 1.67 Acres Operation DisturbanceRIPARIAN 1506 Streams-300 ft buffer 15.34 Acres Construction DisturbanceRIPARIAN 1506 Streams-300 ft buffer 4.77 Acres Operation DisturbanceRIPARIAN 1506 Waterbody-100 ft buffer 0.99 Acres Construction DisturbanceRIPARIAN 1506 Waterbody-100 ft buffer 0.45 Acres Operation DisturbanceRIPARIAN 1506 Waterbody-300 ft buffer 2.22 Acres Construction DisturbanceRIPARIAN 1506 Waterbody-300 ft buffer 0.95 Acres Operation DisturbanceRIPARIAN 1510 Streams-100 ft buffer 0.28 Acres Construction DisturbanceRIPARIAN 1510 Streams-100 ft buffer 0.09 Acres Operation DisturbanceRIPARIAN 1510 Streams-300 ft buffer 0.78 Acres Construction DisturbanceRIPARIAN 1510 Streams-300 ft buffer 0.25 Acres Operation DisturbanceRIPARIAN 1510 Waterbody-100 ft buffer 0.05 Acres Construction DisturbanceRIPARIAN 1510 Waterbody-100 ft buffer 0.02 Acres Operation DisturbanceRIPARIAN 1510 Waterbody-300 ft buffer 0.20 Acres Construction DisturbanceRIPARIAN 1510 Waterbody-300 ft buffer 0.08 Acres Operation Disturbance

Page 149: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

RIPARIAN 1520 Streams-100 ft buffer 0.06 Acres Construction DisturbanceRIPARIAN 1520 Streams-100 ft buffer 0.03 Acres Operation DisturbanceRIPARIAN 1520 Streams-300 ft buffer 0.18 Acres Construction DisturbanceRIPARIAN 1520 Streams-300 ft buffer 0.08 Acres Operation DisturbanceRIPARIAN 1520 Waterbody-100 ft buffer 0.06 Acres Construction DisturbanceRIPARIAN 1520 Waterbody-100 ft buffer 0.03 Acres Operation DisturbanceRIPARIAN 1520 Waterbody-300 ft buffer 0.21 Acres Construction DisturbanceRIPARIAN 1520 Waterbody-300 ft buffer 0.09 Acres Operation DisturbanceRIPARIAN 1540.1 Streams-100 ft buffer 0.41 Acres Construction DisturbanceRIPARIAN 1540.1 Streams-100 ft buffer 0.11 Acres Operation DisturbanceRIPARIAN 1540.1 Streams-300 ft buffer 1.22 Acres Construction DisturbanceRIPARIAN 1540.1 Streams-300 ft buffer 0.34 Acres Operation DisturbanceRIPARIAN 1540.1 Waterbody-100 ft buffer 0.03 Acres Construction DisturbanceRIPARIAN 1540.1 Waterbody-100 ft buffer 0.01 Acres Operation DisturbanceRIPARIAN 1540.1 Waterbody-300 ft buffer 0.10 Acres Construction DisturbanceRIPARIAN 1540.1 Waterbody-300 ft buffer 0.04 Acres Operation DisturbanceRIPARIAN 1540.2 Streams-100 ft buffer 0.23 Acres Construction DisturbanceRIPARIAN 1540.2 Streams-100 ft buffer 0.07 Acres Operation DisturbanceRIPARIAN 1540.2 Streams-300 ft buffer 0.70 Acres Construction DisturbanceRIPARIAN 1540.2 Streams-300 ft buffer 0.20 Acres Operation DisturbanceRIPARIAN 1540.2 Waterbody-100 ft buffer 0.16 Acres Construction DisturbanceRIPARIAN 1540.2 Waterbody-100 ft buffer 0.06 Acres Operation DisturbanceRIPARIAN 1540.2 Waterbody-300 ft buffer 0.30 Acres Construction DisturbanceRIPARIAN 1540.2 Waterbody-300 ft buffer 0.11 Acres Operation DisturbanceRIPARIAN 1545 Streams-100 ft buffer 0.45 Acres Construction DisturbanceRIPARIAN 1545 Streams-100 ft buffer 0.09 Acres Operation DisturbanceRIPARIAN 1545 Streams-300 ft buffer 1.38 Acres Construction DisturbanceRIPARIAN 1545 Streams-300 ft buffer 0.28 Acres Operation DisturbanceRIPARIAN 1550.1 Streams-100 ft buffer 0.50 Acres Construction DisturbanceRIPARIAN 1550.1 Streams-100 ft buffer 0.23 Acres Operation DisturbanceRIPARIAN 1550.1 Streams-300 ft buffer 1.62 Acres Construction DisturbanceRIPARIAN 1550.1 Streams-300 ft buffer 0.71 Acres Operation DisturbanceRIPARIAN 1550.1 Waterbody-100 ft buffer 0.06 Acres Construction DisturbanceRIPARIAN 1550.1 Waterbody-100 ft buffer 0.03 Acres Operation DisturbanceRIPARIAN 1550.1 Waterbody-300 ft buffer 0.17 Acres Construction DisturbanceRIPARIAN 1550.1 Waterbody-300 ft buffer 0.09 Acres Operation DisturbanceRIPARIAN 1660 Streams-100 ft buffer 0.25 Acres Construction DisturbanceRIPARIAN 1660 Streams-100 ft buffer 0.08 Acres Operation DisturbanceRIPARIAN 1660 Streams-300 ft buffer 0.65 Acres Construction DisturbanceRIPARIAN 1660 Streams-300 ft buffer 0.22 Acres Operation DisturbanceRIPARIAN 1660 Waterbody-100 ft buffer 0.67 Acres Construction DisturbanceRIPARIAN 1660 Waterbody-100 ft buffer 0.41 Acres Operation DisturbanceRIPARIAN 1660 Waterbody-300 ft buffer 0.99 Acres Construction DisturbanceRIPARIAN 1660 Waterbody-300 ft buffer 0.60 Acres Operation DisturbanceRIPARIAN 1670 Streams-100 ft buffer 0.04 Acres Construction Disturbance

Page 150: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

RIPARIAN 1670 Streams-100 ft buffer 0.02 Acres Operation DisturbanceRIPARIAN 1670 Streams-300 ft buffer 0.12 Acres Construction DisturbanceRIPARIAN 1670 Streams-300 ft buffer 0.05 Acres Operation DisturbanceRIPARIAN 1670 Waterbody-100 ft buffer 0.17 Acres Construction DisturbanceRIPARIAN 1670 Waterbody-100 ft buffer 0.07 Acres Operation DisturbanceRIPARIAN 1670 Waterbody-300 ft buffer 0.27 Acres Construction DisturbanceRIPARIAN 1670 Waterbody-300 ft buffer 0.11 Acres Operation DisturbanceRIPARIAN 1710 Streams-100 ft buffer 0.27 Acres Construction DisturbanceRIPARIAN 1710 Streams-100 ft buffer 0.07 Acres Operation DisturbanceRIPARIAN 1710 Streams-300 ft buffer 0.80 Acres Construction DisturbanceRIPARIAN 1710 Streams-300 ft buffer 0.21 Acres Operation DisturbanceRIPARIAN 1710 Waterbody-100 ft buffer 1.15 Acres Construction DisturbanceRIPARIAN 1710 Waterbody-100 ft buffer 0.61 Acres Operation DisturbanceRIPARIAN 1710 Waterbody-300 ft buffer 1.63 Acres Construction DisturbanceRIPARIAN 1710 Waterbody-300 ft buffer 0.86 Acres Operation DisturbanceRIPARIAN 1730 Streams-100 ft buffer 0.02 Acres Construction DisturbanceRIPARIAN 1730 Streams-100 ft buffer 0.00 Acres Operation DisturbanceRIPARIAN 1730 Streams-300 ft buffer 0.10 Acres Construction DisturbanceRIPARIAN 1730 Streams-300 ft buffer 0.04 Acres Operation DisturbanceRIPARIAN 1750 Streams-100 ft buffer 0.14 Acres Construction DisturbanceRIPARIAN 1750 Streams-100 ft buffer 0.03 Acres Operation DisturbanceRIPARIAN 1750 Streams-300 ft buffer 0.37 Acres Construction DisturbanceRIPARIAN 1750 Streams-300 ft buffer 0.07 Acres Operation DisturbanceRIPARIAN 1760 Streams-100 ft buffer 0.19 Acres Construction DisturbanceRIPARIAN 1760 Streams-100 ft buffer 0.08 Acres Operation DisturbanceRIPARIAN 1760 Streams-300 ft buffer 0.58 Acres Construction DisturbanceRIPARIAN 1760 Streams-300 ft buffer 0.25 Acres Operation DisturbanceRIPARIAN 1771 Waterbody-100 ft buffer 0.02 Acres Construction DisturbanceRIPARIAN 1771 Waterbody-100 ft buffer 0.01 Acres Operation DisturbanceRIPARIAN 1771 Waterbody-300 ft buffer 0.08 Acres Construction DisturbanceRIPARIAN 1771 Waterbody-300 ft buffer 0.03 Acres Operation DisturbanceRIPARIAN 1820 Waterbody-100 ft buffer 0.03 Acres Construction DisturbanceRIPARIAN 1820 Waterbody-100 ft buffer 0.01 Acres Operation DisturbanceRIPARIAN 1820 Waterbody-300 ft buffer 0.13 Acres Construction DisturbanceRIPARIAN 1820 Waterbody-300 ft buffer 0.05 Acres Operation DisturbanceRIPARIAN 1321.01 Streams-100 ft buffer 1.97 Acres Construction DisturbanceRIPARIAN 1321.01 Streams-100 ft buffer 0.46 Acres Operation DisturbanceRIPARIAN 1322.12 Streams-100 ft buffer 1.73 Acres Construction DisturbanceRIPARIAN 1322.12 Streams-100 ft buffer 0.24 Acres Operation DisturbanceRIPARIAN 1322.21 Streams-100 ft buffer 0.98 Acres Construction DisturbanceRIPARIAN 1322.21 Streams-100 ft buffer 0.24 Acres Operation DisturbanceRIPARIAN 1322.23 Streams-100 ft buffer 1.52 Acres Construction DisturbanceRIPARIAN 1322.23 Streams-100 ft buffer 0.16 Acres Operation DisturbanceRIPARIAN 1322.51 Streams-100 ft buffer 0.22 Acres Construction DisturbanceRIPARIAN 1322.51 Streams-100 ft buffer 0.04 Acres Operation Disturbance

Page 151: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

RIPARIAN 1322.53 Streams-100 ft buffer 1.71 Acres Construction DisturbanceRIPARIAN 1322.53 Streams-100 ft buffer 0.45 Acres Operation DisturbanceRIPARIAN 1322.71 Streams-100 ft buffer 5.25 Acres Construction DisturbanceRIPARIAN 1322.71 Streams-100 ft buffer 1.47 Acres Operation DisturbanceRIPARIAN 1323.01 Streams-100 ft buffer 2.04 Acres Construction DisturbanceRIPARIAN 1323.01 Streams-100 ft buffer 0.55 Acres Operation DisturbanceRIPARIAN 1323.02 Streams-100 ft buffer 0.90 Acres Construction DisturbanceRIPARIAN 1323.02 Streams-100 ft buffer 0.47 Acres Operation DisturbanceRIPARIAN 1321.01 Waterbody-100 ft buffer 0.99 Acres Construction DisturbanceRIPARIAN 1321.01 Waterbody-100 ft buffer 0.17 Acres Operation DisturbanceRIPARIAN 1322.02 Waterbody-100 ft buffer 0.00 Acres Construction DisturbanceRIPARIAN 1322.02 Waterbody-100 ft buffer 0.00 Acres Operation DisturbanceRIPARIAN 1322.22 Waterbody-100 ft buffer 0.07 Acres Construction DisturbanceRIPARIAN 1322.22 Waterbody-100 ft buffer 0.01 Acres Operation DisturbanceRIPARIAN 1322.51 Waterbody-100 ft buffer 0.08 Acres Construction DisturbanceRIPARIAN 1322.51 Waterbody-100 ft buffer 0.01 Acres Operation DisturbanceRIPARIAN 1323.01 Waterbody-100 ft buffer 0.51 Acres Construction DisturbanceRIPARIAN 1323.01 Waterbody-100 ft buffer 0.14 Acres Operation DisturbanceRIPARIAN 1323.02 Waterbody-100 ft buffer 0.36 Acres Construction DisturbanceRIPARIAN 1323.02 Waterbody-100 ft buffer 0.10 Acres Operation DisturbanceRIPARIAN 1321.01 Streams-300 ft buffer 5.31 Acres Construction DisturbanceRIPARIAN 1321.01 Streams-300 ft buffer 1.16 Acres Operation DisturbanceRIPARIAN 1322.12 Streams-300 ft buffer 4.50 Acres Construction DisturbanceRIPARIAN 1322.12 Streams-300 ft buffer 0.61 Acres Operation DisturbanceRIPARIAN 1322.21 Streams-300 ft buffer 2.46 Acres Construction DisturbanceRIPARIAN 1322.21 Streams-300 ft buffer 0.61 Acres Operation DisturbanceRIPARIAN 1322.22 Streams-300 ft buffer 0.00 Acres Construction DisturbanceRIPARIAN 1322.22 Streams-300 ft buffer 0.00 Acres Operation DisturbanceRIPARIAN 1322.23 Streams-300 ft buffer 4.38 Acres Construction DisturbanceRIPARIAN 1322.23 Streams-300 ft buffer 0.45 Acres Operation DisturbanceRIPARIAN 1322.51 Streams-300 ft buffer 0.65 Acres Construction DisturbanceRIPARIAN 1322.51 Streams-300 ft buffer 0.11 Acres Operation DisturbanceRIPARIAN 1322.53 Streams-300 ft buffer 4.40 Acres Construction DisturbanceRIPARIAN 1322.53 Streams-300 ft buffer 1.17 Acres Operation DisturbanceRIPARIAN 1322.71 Streams-300 ft buffer 13.71 Acres Construction DisturbanceRIPARIAN 1322.71 Streams-300 ft buffer 3.83 Acres Operation DisturbanceRIPARIAN 1323.01 Streams-300 ft buffer 5.32 Acres Construction DisturbanceRIPARIAN 1323.01 Streams-300 ft buffer 1.44 Acres Operation DisturbanceRIPARIAN 1323.02 Streams-300 ft buffer 2.68 Acres Construction DisturbanceRIPARIAN 1323.02 Streams-300 ft buffer 1.41 Acres Operation DisturbanceRIPARIAN 1321.01 Waterbody-300 ft buffer 2.60 Acres Construction DisturbanceRIPARIAN 1321.01 Waterbody-300 ft buffer 0.48 Acres Operation DisturbanceRIPARIAN 1322.02 Waterbody-300 ft buffer 0.02 Acres Construction DisturbanceRIPARIAN 1322.02 Waterbody-300 ft buffer 0.00 Acres Operation DisturbanceRIPARIAN 1322.22 Waterbody-300 ft buffer 0.36 Acres Construction Disturbance

Page 152: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

RIPARIAN 1322.22 Waterbody-300 ft buffer 0.05 Acres Operation DisturbanceRIPARIAN 1322.51 Waterbody-300 ft buffer 0.40 Acres Construction DisturbanceRIPARIAN 1322.51 Waterbody-300 ft buffer 0.06 Acres Operation DisturbanceRIPARIAN 1323.01 Waterbody-300 ft buffer 2.61 Acres Construction DisturbanceRIPARIAN 1323.01 Waterbody-300 ft buffer 0.69 Acres Operation DisturbanceRIPARIAN 1323.02 Waterbody-300 ft buffer 1.66 Acres Construction DisturbanceRIPARIAN 1323.02 Waterbody-300 ft buffer 0.48 Acres Operation DisturbanceRNG 1030 BLM#DALEY RANCH#00605#26194.3177578851 10.32 Acres Construction DisturbanceRNG 1030 BLM#DALEY RANCH#00605#26194.3177578851 57.24 Acres Construction DisturbanceRNG 1030 BLM#DALEY RANCH#00605#26194.3177578851 3.97 Acres Operation DisturbanceRNG 1030 BLM#DALEY RANCH#00605#26194.3177578851 11.60 Acres Operation DisturbanceRNG 1030 BLM#LAZY Y S RANCH#10626#17873.1640766051 0.64 Acres Construction DisturbanceRNG 1030 BLM#LAZY Y S RANCH#10626#17873.1640766051 0.68 Acres Construction DisturbanceRNG 1030 BLM#LAZY Y S RANCH#10626#17873.1640766051 0.28 Acres Operation DisturbanceRNG 1030 BLM#LAZY Y S RANCH#10626#17873.1640766051 0.29 Acres Operation DisturbanceRNG 1030 BLM#PINE GROVE/BOLTEN#10623#283657.521312978 10.70 Acres Construction DisturbanceRNG 1030 BLM#PINE GROVE/BOLTEN#10623#283657.521312978 71.29 Acres Construction DisturbanceRNG 1030 BLM#PINE GROVE/BOLTEN#10623#283657.521312978 3.83 Acres Operation DisturbanceRNG 1030 BLM#PINE GROVE/BOLTEN#10623#283657.521312978 14.47 Acres Operation DisturbanceRNG 1030 BLM#RINER#10615#56016.0380749799 27.32 Acres Construction DisturbanceRNG 1030 BLM#RINER#10615#56016.0380749799 174.33 Acres Construction DisturbanceRNG 1030 BLM#RINER#10615#56016.0380749799 9.38 Acres Operation DisturbanceRNG 1030 BLM#RINER#10615#56016.0380749799 28.89 Acres Operation DisturbanceRNG 1030 BLM#SIXTEEN MILE#10616#82111.0990494817 23.49 Acres Construction DisturbanceRNG 1030 BLM#SIXTEEN MILE#10616#82111.0990494817 100.88 Acres Construction DisturbanceRNG 1030 BLM#SIXTEEN MILE#10616#82111.0990494817 9.08 Acres Operation DisturbanceRNG 1030 BLM#SIXTEEN MILE#10616#82111.0990494817 22.71 Acres Operation DisturbanceRNG 1040 BLM#ECHO SPRINGS#10607#45516.5059283292 9.65 Acres Construction DisturbanceRNG 1040 BLM#ECHO SPRINGS#10607#45516.5059283292 62.80 Acres Construction DisturbanceRNG 1040 BLM#ECHO SPRINGS#10607#45516.5059283292 2.00 Acres Operation DisturbanceRNG 1040 BLM#ECHO SPRINGS#10607#45516.5059283292 12.05 Acres Operation DisturbanceRNG 1040 BLM#LAZY Y S RANCH#10626#17873.1640766051 4.05 Acres Construction DisturbanceRNG 1040 BLM#LAZY Y S RANCH#10626#17873.1640766051 54.04 Acres Construction DisturbanceRNG 1040 BLM#LAZY Y S RANCH#10626#17873.1640766051 0.84 Acres Operation DisturbanceRNG 1040 BLM#LAZY Y S RANCH#10626#17873.1640766051 10.14 Acres Operation DisturbanceRNG 1040 BLM#RINER#10615#56016.0380749799 0.18 Acres Construction DisturbanceRNG 1040 BLM#RINER#10615#56016.0380749799 0.03 Acres Operation DisturbanceRNG 1040 BLM#SOUTH WAMSUTTER#10620#31409.8343562864 0.02 Acres Construction DisturbanceRNG 1040 BLM#SOUTH WAMSUTTER#10620#31409.8343562864 0.06 Acres Construction DisturbanceRNG 1040 BLM#SOUTH WAMSUTTER#10620#31409.8343562864 0.00 Acres Operation DisturbanceRNG 1040 BLM#SOUTH WAMSUTTER#10620#31409.8343562864 0.01 Acres Operation DisturbanceRNG 1100 BLM#Disappointment#04400#32302.3681422777 0.01 Acres Construction DisturbanceRNG 1100 BLM#Disappointment#04400#32302.3681422777 0.19 Acres Construction DisturbanceRNG 1100 BLM#Disappointment#04400#32302.3681422777 0.00 Acres Operation DisturbanceRNG 1100 BLM#Disappointment#04400#32302.3681422777 0.09 Acres Operation Disturbance

Page 153: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

RNG 1100 BLM#Elk Springs#06326#26619.7662765808 49.43 Acres Construction DisturbanceRNG 1100 BLM#Elk Springs#06326#26619.7662765808 87.17 Acres Construction DisturbanceRNG 1100 BLM#Elk Springs#06326#26619.7662765808 10.73 Acres Operation DisturbanceRNG 1100 BLM#Elk Springs#06326#26619.7662765808 16.98 Acres Operation DisturbanceRNG 1100 BLM#Horse Draw#06332#17760.7720692309 75.97 Acres Construction DisturbanceRNG 1100 BLM#Horse Draw#06332#17760.7720692309 79.88 Acres Construction DisturbanceRNG 1100 BLM#Horse Draw#06332#17760.7720692309 16.28 Acres Operation DisturbanceRNG 1100 BLM#Horse Draw#06332#17760.7720692309 17.53 Acres Operation DisturbanceRNG 1100 BLM#Massadona#06324#10870.9226002101 3.98 Acres Construction DisturbanceRNG 1100 BLM#Massadona#06324#10870.9226002101 6.31 Acres Construction DisturbanceRNG 1100 BLM#Massadona#06324#10870.9226002101 1.32 Acres Operation DisturbanceRNG 1100 BLM#Massadona#06324#10870.9226002101 1.55 Acres Operation DisturbanceRNG 1100 BLM#Sagebrush Cr#04403#23553.3330916562 0.02 Acres Construction DisturbanceRNG 1100 BLM#Sagebrush Cr#04403#23553.3330916562 0.02 Acres Construction DisturbanceRNG 1100 BLM#Sagebrush Cr#04403#23553.3330916562 0.01 Acres Operation DisturbanceRNG 1100 BLM#Sagebrush Cr#04403#23553.3330916562 0.01 Acres Operation DisturbanceRNG 1100 BLM#Unalloted#99999#67604.7607835773 0.00 Acres Construction DisturbanceRNG 1100 BLM#Unalloted#99999#67604.7607835773 0.43 Acres Construction DisturbanceRNG 1100 BLM#Unalloted#99999#67604.7607835773 0.00 Acres Operation DisturbanceRNG 1100 BLM#Unalloted#99999#67604.7607835773 0.21 Acres Operation DisturbanceRNG 1100 BLM#Upper Coal Cr#06330#7737.52879626959 0.87 Acres Construction DisturbanceRNG 1100 BLM#Upper Coal Cr#06330#7737.52879626959 0.96 Acres Construction DisturbanceRNG 1100 BLM#Upper Coal Cr#06330#7737.52879626959 0.43 Acres Operation DisturbanceRNG 1100 BLM#Upper Coal Cr#06330#7737.52879626959 0.47 Acres Operation DisturbanceRNG 1100 BLM#White River Trail#06699#927.974476726167 0.31 Acres Construction DisturbanceRNG 1100 BLM#White River Trail#06699#927.974476726167 0.75 Acres Construction DisturbanceRNG 1100 BLM#White River Trail#06699#927.974476726167 0.04 Acres Operation DisturbanceRNG 1100 BLM#White River Trail#06699#927.974476726167 0.13 Acres Operation DisturbanceRNG 1100 BLM#Winter Valley Gulch#06329#1564.06398600447 1.07 Acres Construction DisturbanceRNG 1100 BLM#Winter Valley Gulch#06329#1564.06398600447 1.28 Acres Construction DisturbanceRNG 1100 BLM#Winter Valley Gulch#06329#1564.06398600447 0.53 Acres Operation DisturbanceRNG 1100 BLM#Winter Valley Gulch#06329#1564.06398600447 0.63 Acres Operation DisturbanceRNG 1100 BLM#Wolf Cr#06323#76620.115686343 0.21 Acres Construction DisturbanceRNG 1100 BLM#Wolf Cr#06323#76620.115686343 0.27 Acres Construction DisturbanceRNG 1100 BLM#Wolf Cr#06323#76620.115686343 0.10 Acres Operation DisturbanceRNG 1100 BLM#Wolf Cr#06323#76620.115686343 0.14 Acres Operation DisturbanceRNG 1101 BLM#Cedar Springs Draw#04402#35489.2829756299 10.83 Acres Construction DisturbanceRNG 1101 BLM#Cedar Springs Draw#04402#35489.2829756299 16.14 Acres Construction DisturbanceRNG 1101 BLM#Cedar Springs Draw#04402#35489.2829756299 1.56 Acres Operation DisturbanceRNG 1101 BLM#Cedar Springs Draw#04402#35489.2829756299 2.37 Acres Operation DisturbanceRNG 1103 BLM#Cedar Springs Draw#04402#35489.2829756299 0.98 Acres Construction DisturbanceRNG 1103 BLM#Cedar Springs Draw#04402#35489.2829756299 11.79 Acres Construction DisturbanceRNG 1103 BLM#Cedar Springs Draw#04402#35489.2829756299 0.15 Acres Operation DisturbanceRNG 1103 BLM#Cedar Springs Draw#04402#35489.2829756299 1.83 Acres Operation DisturbanceRNG 1103 BLM#Disappointment#04400#32302.3681422777 0.01 Acres Construction Disturbance

Page 154: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

RNG 1103 BLM#Disappointment#04400#32302.3681422777 12.80 Acres Construction DisturbanceRNG 1103 BLM#Disappointment#04400#32302.3681422777 0.00 Acres Operation DisturbanceRNG 1103 BLM#Disappointment#04400#32302.3681422777 1.95 Acres Operation DisturbanceRNG 1103 BLM#E Canyon#04429#3227.27178635855 0.09 Acres Construction DisturbanceRNG 1103 BLM#E Canyon#04429#3227.27178635855 0.74 Acres Construction DisturbanceRNG 1103 BLM#E Canyon#04429#3227.27178635855 0.02 Acres Operation DisturbanceRNG 1103 BLM#E Canyon#04429#3227.27178635855 0.19 Acres Operation DisturbanceRNG 1103 BLM#W Wapiti Peak#04401#10410.8041346067 0.49 Acres Construction DisturbanceRNG 1103 BLM#W Wapiti Peak#04401#10410.8041346067 0.12 Acres Operation DisturbanceRNG 1104 BLM#Disappointment#04400#32302.3681422777 0.83 Acres Construction DisturbanceRNG 1104 BLM#Disappointment#04400#32302.3681422777 52.18 Acres Construction DisturbanceRNG 1104 BLM#Disappointment#04400#32302.3681422777 0.23 Acres Operation DisturbanceRNG 1104 BLM#Disappointment#04400#32302.3681422777 11.59 Acres Operation DisturbanceRNG 1104 BLM#Elk Springs#06326#26619.7662765808 1.27 Acres Construction DisturbanceRNG 1104 BLM#Elk Springs#06326#26619.7662765808 6.20 Acres Construction DisturbanceRNG 1104 BLM#Elk Springs#06326#26619.7662765808 0.27 Acres Operation DisturbanceRNG 1104 BLM#Elk Springs#06326#26619.7662765808 1.29 Acres Operation DisturbanceRNG 1104 BLM#W Wapiti Peak#04401#10410.8041346067 4.47 Acres Construction DisturbanceRNG 1104 BLM#W Wapiti Peak#04401#10410.8041346067 1.91 Acres Operation DisturbanceRNG 1105 BLM#Disappointment#04400#32302.3681422777 25.71 Acres Construction DisturbanceRNG 1105 BLM#Disappointment#04400#32302.3681422777 65.83 Acres Construction DisturbanceRNG 1105 BLM#Disappointment#04400#32302.3681422777 5.23 Acres Operation DisturbanceRNG 1105 BLM#Disappointment#04400#32302.3681422777 13.40 Acres Operation DisturbanceRNG 1105 BLM#Elk Springs#06326#26619.7662765808 3.20 Acres Construction DisturbanceRNG 1105 BLM#Elk Springs#06326#26619.7662765808 3.39 Acres Construction DisturbanceRNG 1105 BLM#Elk Springs#06326#26619.7662765808 0.62 Acres Operation DisturbanceRNG 1105 BLM#Elk Springs#06326#26619.7662765808 0.65 Acres Operation DisturbanceRNG 1106 BLM#Cedar Springs Draw#04402#35489.2829756299 3.50 Acres Construction DisturbanceRNG 1106 BLM#Cedar Springs Draw#04402#35489.2829756299 24.14 Acres Construction DisturbanceRNG 1106 BLM#Cedar Springs Draw#04402#35489.2829756299 1.21 Acres Operation DisturbanceRNG 1106 BLM#Cedar Springs Draw#04402#35489.2829756299 5.31 Acres Operation DisturbanceRNG 1106 BLM#Disappointment#04400#32302.3681422777 0.09 Acres Construction DisturbanceRNG 1106 BLM#Disappointment#04400#32302.3681422777 0.05 Acres Operation DisturbanceRNG 1106 BLM#Elk Springs#06326#26619.7662765808 5.63 Acres Construction DisturbanceRNG 1106 BLM#Elk Springs#06326#26619.7662765808 6.32 Acres Construction DisturbanceRNG 1106 BLM#Elk Springs#06326#26619.7662765808 1.07 Acres Operation DisturbanceRNG 1106 BLM#Elk Springs#06326#26619.7662765808 1.14 Acres Operation DisturbanceRNG 1106 BLM#Sagebrush Cr#04403#23553.3330916562 0.79 Acres Construction DisturbanceRNG 1106 BLM#Sagebrush Cr#04403#23553.3330916562 0.79 Acres Construction DisturbanceRNG 1106 BLM#Sagebrush Cr#04403#23553.3330916562 0.45 Acres Operation DisturbanceRNG 1106 BLM#Sagebrush Cr#04403#23553.3330916562 0.45 Acres Operation DisturbanceRNG 1106 BLM#W Wapiti Peak#04401#10410.8041346067 6.75 Acres Construction DisturbanceRNG 1106 BLM#W Wapiti Peak#04401#10410.8041346067 55.47 Acres Construction DisturbanceRNG 1106 BLM#W Wapiti Peak#04401#10410.8041346067 2.60 Acres Operation DisturbanceRNG 1106 BLM#W Wapiti Peak#04401#10410.8041346067 14.07 Acres Operation Disturbance

Page 155: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

RNG 1110 BLM#ECHO SPRINGS#10607#45516.5059283292 1.10 Acres Construction DisturbanceRNG 1110 BLM#ECHO SPRINGS#10607#45516.5059283292 12.47 Acres Construction DisturbanceRNG 1110 BLM#ECHO SPRINGS#10607#45516.5059283292 0.22 Acres Operation DisturbanceRNG 1110 BLM#ECHO SPRINGS#10607#45516.5059283292 2.26 Acres Operation DisturbanceRNG 1110 BLM#NORTH LACLEDE#10613#41501.422406059 5.26 Acres Construction DisturbanceRNG 1110 BLM#NORTH LACLEDE#10613#41501.422406059 10.26 Acres Construction DisturbanceRNG 1110 BLM#NORTH LACLEDE#10613#41501.422406059 1.09 Acres Operation DisturbanceRNG 1110 BLM#NORTH LACLEDE#10613#41501.422406059 2.13 Acres Operation DisturbanceRNG 1110 BLM#SOUTH WAMSUTTER#10620#31409.8343562864 6.40 Acres Construction DisturbanceRNG 1110 BLM#SOUTH WAMSUTTER#10620#31409.8343562864 69.02 Acres Construction DisturbanceRNG 1110 BLM#SOUTH WAMSUTTER#10620#31409.8343562864 1.26 Acres Operation DisturbanceRNG 1110 BLM#SOUTH WAMSUTTER#10620#31409.8343562864 12.48 Acres Operation DisturbanceRNG 1115 BLM#BIG ROBBER SPREADERS#10504#1129.42204952749 0.99 Acres Construction DisturbanceRNG 1115 BLM#BIG ROBBER SPREADERS#10504#1129.42204952749 0.99 Acres Construction DisturbanceRNG 1115 BLM#BIG ROBBER SPREADERS#10504#1129.42204952749 0.21 Acres Operation DisturbanceRNG 1115 BLM#BIG ROBBER SPREADERS#10504#1129.42204952749 0.21 Acres Operation DisturbanceRNG 1115 BLM#BIG ROBBER#10503#17615.5023038054 65.84 Acres Construction DisturbanceRNG 1115 BLM#BIG ROBBER#10503#17615.5023038054 68.20 Acres Construction DisturbanceRNG 1115 BLM#BIG ROBBER#10503#17615.5023038054 12.81 Acres Operation DisturbanceRNG 1115 BLM#BIG ROBBER#10503#17615.5023038054 13.29 Acres Operation DisturbanceRNG 1115 BLM#COTTONWOOD HILL#10508#14568.9684074197 76.26 Acres Construction DisturbanceRNG 1115 BLM#COTTONWOOD HILL#10508#14568.9684074197 77.76 Acres Construction DisturbanceRNG 1115 BLM#COTTONWOOD HILL#10508#14568.9684074197 14.69 Acres Operation DisturbanceRNG 1115 BLM#COTTONWOOD HILL#10508#14568.9684074197 14.97 Acres Operation DisturbanceRNG 1115 BLM#DAD#00442#675.601459864059 0.11 Acres Construction DisturbanceRNG 1115 BLM#DAD#00442#675.601459864059 0.11 Acres Construction DisturbanceRNG 1115 BLM#DAD#00442#675.601459864059 0.02 Acres Operation DisturbanceRNG 1115 BLM#DAD#00442#675.601459864059 0.02 Acres Operation DisturbanceRNG 1115 BLM#DOTY MOUNTAIN#00415#85635.4768188801 49.38 Acres Construction DisturbanceRNG 1115 BLM#DOTY MOUNTAIN#00415#85635.4768188801 66.88 Acres Construction DisturbanceRNG 1115 BLM#DOTY MOUNTAIN#00415#85635.4768188801 9.43 Acres Operation DisturbanceRNG 1115 BLM#DOTY MOUNTAIN#00415#85635.4768188801 12.77 Acres Operation DisturbanceRNG 1115 BLM#HEADQUARTERS RANCH#10529#481.536182094129 0.00 Acres Construction DisturbanceRNG 1115 BLM#HEADQUARTERS RANCH#10529#481.536182094129 0.00 Acres Operation DisturbanceRNG 1115 BLM#MEXICAN FLATS#10515#15503.6968595568 37.31 Acres Construction DisturbanceRNG 1115 BLM#MEXICAN FLATS#10515#15503.6968595568 37.68 Acres Construction DisturbanceRNG 1115 BLM#MEXICAN FLATS#10515#15503.6968595568 7.27 Acres Operation DisturbanceRNG 1115 BLM#MEXICAN FLATS#10515#15503.6968595568 7.34 Acres Operation DisturbanceRNG 1115 BLM#MEXICAN GRAVES#10516#20269.7736397382 35.05 Acres Construction DisturbanceRNG 1115 BLM#MEXICAN GRAVES#10516#20269.7736397382 36.10 Acres Construction DisturbanceRNG 1115 BLM#MEXICAN GRAVES#10516#20269.7736397382 6.82 Acres Operation DisturbanceRNG 1115 BLM#MEXICAN GRAVES#10516#20269.7736397382 7.03 Acres Operation DisturbanceRNG 1115 BLM#OPPENHEIMER#10517#13237.7671614618 6.38 Acres Construction DisturbanceRNG 1115 BLM#OPPENHEIMER#10517#13237.7671614618 6.44 Acres Construction DisturbanceRNG 1115 BLM#OPPENHEIMER#10517#13237.7671614618 1.33 Acres Operation Disturbance

Page 156: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

RNG 1115 BLM#OPPENHEIMER#10517#13237.7671614618 1.34 Acres Operation DisturbanceRNG 1115 BLM#POISON BUTTES#10518#6512.02459858744 0.35 Acres Construction DisturbanceRNG 1115 BLM#POISON BUTTES#10518#6512.02459858744 0.35 Acres Construction DisturbanceRNG 1115 BLM#POISON BUTTES#10518#6512.02459858744 0.07 Acres Operation DisturbanceRNG 1115 BLM#POWDER RIM ROTATION#10520#47004.957409481 76.90 Acres Construction DisturbanceRNG 1115 BLM#POWDER RIM ROTATION#10520#47004.957409481 77.96 Acres Construction DisturbanceRNG 1115 BLM#POWDER RIM ROTATION#10520#47004.957409481 14.79 Acres Operation DisturbanceRNG 1115 BLM#POWDER RIM ROTATION#10520#47004.957409481 14.99 Acres Operation DisturbanceRNG 1115 BLM#RED CREEK#10521#32297.4603812587 53.78 Acres Construction DisturbanceRNG 1115 BLM#RED CREEK#10521#32297.4603812587 54.45 Acres Construction DisturbanceRNG 1115 BLM#RED CREEK#10521#32297.4603812587 10.31 Acres Operation DisturbanceRNG 1115 BLM#RED CREEK#10521#32297.4603812587 10.44 Acres Operation DisturbanceRNG 1115 BLM#ROTTEN SPRINGS#10523#21138.7727522651 0.00 Acres Construction DisturbanceRNG 1115 BLM#ROTTEN SPRINGS#10523#21138.7727522651 0.00 Acres Construction DisturbanceRNG 1115 BLM#ROTTEN SPRINGS#10523#21138.7727522651 0.00 Acres Operation DisturbanceRNG 1115 BLM#ROTTEN SPRINGS#10523#21138.7727522651 0.00 Acres Operation DisturbanceRNG 1115 BLM#SAND CREEK#10524#30010.0287397015 1.14 Acres Construction DisturbanceRNG 1115 BLM#SAND CREEK#10524#30010.0287397015 1.14 Acres Construction DisturbanceRNG 1115 BLM#SAND CREEK#10524#30010.0287397015 0.24 Acres Operation DisturbanceRNG 1115 BLM#SAND CREEK#10524#30010.0287397015 0.24 Acres Operation DisturbanceRNG 1115 BLM#SOUTH BARREL#10525#10300.5841916858 0.12 Acres Construction DisturbanceRNG 1115 BLM#SOUTH BARREL#10525#10300.5841916858 0.12 Acres Construction DisturbanceRNG 1115 BLM#SOUTH BARREL#10525#10300.5841916858 0.02 Acres Operation DisturbanceRNG 1115 BLM#SOUTH BARREL#10525#10300.5841916858 0.02 Acres Operation DisturbanceRNG 1115 BLM#SOUTH FLAT TOP#10526#19018.1513606232 21.34 Acres Construction DisturbanceRNG 1115 BLM#SOUTH FLAT TOP#10526#19018.1513606232 26.70 Acres Construction DisturbanceRNG 1115 BLM#SOUTH FLAT TOP#10526#19018.1513606232 4.13 Acres Operation DisturbanceRNG 1115 BLM#SOUTH FLAT TOP#10526#19018.1513606232 5.16 Acres Operation DisturbanceRNG 1115 BLM#SOUTH LACLEDE#10610#52954.1021022905 81.07 Acres Construction DisturbanceRNG 1115 BLM#SOUTH LACLEDE#10610#52954.1021022905 107.55 Acres Construction DisturbanceRNG 1115 BLM#SOUTH LACLEDE#10610#52954.1021022905 15.63 Acres Operation DisturbanceRNG 1115 BLM#SOUTH LACLEDE#10610#52954.1021022905 20.77 Acres Operation DisturbanceRNG 1115 BLM#SOUTH WAMSUTTER#10620#31409.8343562864 8.65 Acres Construction DisturbanceRNG 1115 BLM#SOUTH WAMSUTTER#10620#31409.8343562864 12.77 Acres Construction DisturbanceRNG 1115 BLM#SOUTH WAMSUTTER#10620#31409.8343562864 1.65 Acres Operation DisturbanceRNG 1115 BLM#SOUTH WAMSUTTER#10620#31409.8343562864 2.43 Acres Operation DisturbanceRNG 1116 BLM#E Powder Wash#04202#27153.8146780555 0.00 Acres Construction DisturbanceRNG 1116 BLM#E Powder Wash#04202#27153.8146780555 0.00 Acres Construction DisturbanceRNG 1116 BLM#E Powder Wash#04202#27153.8146780555 0.00 Acres Operation DisturbanceRNG 1116 BLM#E Powder Wash#04202#27153.8146780555 0.00 Acres Operation DisturbanceRNG 1116 BLM#POWDER RIM ROTATION#10520#47004.957409481 66.24 Acres Construction DisturbanceRNG 1116 BLM#POWDER RIM ROTATION#10520#47004.957409481 105.13 Acres Construction DisturbanceRNG 1116 BLM#POWDER RIM ROTATION#10520#47004.957409481 13.74 Acres Operation DisturbanceRNG 1116 BLM#POWDER RIM ROTATION#10520#47004.957409481 20.40 Acres Operation DisturbanceRNG 1120 BLM#CONTINENTAL#10506#25777.1350501833 43.53 Acres Construction Disturbance

Page 157: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

RNG 1120 BLM#CONTINENTAL#10506#25777.1350501833 105.30 Acres Construction DisturbanceRNG 1120 BLM#CONTINENTAL#10506#25777.1350501833 9.71 Acres Operation DisturbanceRNG 1120 BLM#CONTINENTAL#10506#25777.1350501833 21.84 Acres Operation DisturbanceRNG 1120 BLM#MEXICAN GRAVES#10516#20269.7736397382 21.84 Acres Construction DisturbanceRNG 1120 BLM#MEXICAN GRAVES#10516#20269.7736397382 46.01 Acres Construction DisturbanceRNG 1120 BLM#MEXICAN GRAVES#10516#20269.7736397382 5.43 Acres Operation DisturbanceRNG 1120 BLM#MEXICAN GRAVES#10516#20269.7736397382 10.27 Acres Operation DisturbanceRNG 1120 BLM#NORTH LACLEDE#10613#41501.422406059 3.94 Acres Construction DisturbanceRNG 1120 BLM#NORTH LACLEDE#10613#41501.422406059 11.02 Acres Construction DisturbanceRNG 1120 BLM#NORTH LACLEDE#10613#41501.422406059 1.01 Acres Operation DisturbanceRNG 1120 BLM#NORTH LACLEDE#10613#41501.422406059 2.65 Acres Operation DisturbanceRNG 1120 BLM#RED CREEK#10521#32297.4603812587 0.93 Acres Construction DisturbanceRNG 1120 BLM#RED CREEK#10521#32297.4603812587 0.93 Acres Construction DisturbanceRNG 1120 BLM#RED CREEK#10521#32297.4603812587 0.25 Acres Operation DisturbanceRNG 1120 BLM#RED CREEK#10521#32297.4603812587 0.25 Acres Operation DisturbanceRNG 1120 BLM#ROTTEN SPRINGS#10523#21138.7727522651 8.29 Acres Construction DisturbanceRNG 1120 BLM#ROTTEN SPRINGS#10523#21138.7727522651 20.73 Acres Construction DisturbanceRNG 1120 BLM#ROTTEN SPRINGS#10523#21138.7727522651 1.83 Acres Operation DisturbanceRNG 1120 BLM#ROTTEN SPRINGS#10523#21138.7727522651 4.27 Acres Operation DisturbanceRNG 1120 BLM#SAND CREEK#10524#30010.0287397015 56.88 Acres Construction DisturbanceRNG 1120 BLM#SAND CREEK#10524#30010.0287397015 137.39 Acres Construction DisturbanceRNG 1120 BLM#SAND CREEK#10524#30010.0287397015 12.69 Acres Operation DisturbanceRNG 1120 BLM#SAND CREEK#10524#30010.0287397015 28.49 Acres Operation DisturbanceRNG 1120 BLM#SOUTH BARREL#10525#10300.5841916858 15.62 Acres Construction DisturbanceRNG 1120 BLM#SOUTH BARREL#10525#10300.5841916858 27.74 Acres Construction DisturbanceRNG 1120 BLM#SOUTH BARREL#10525#10300.5841916858 3.82 Acres Operation DisturbanceRNG 1120 BLM#SOUTH BARREL#10525#10300.5841916858 6.28 Acres Operation DisturbanceRNG 1120 BLM#SOUTH LACLEDE#10610#52954.1021022905 24.61 Acres Construction DisturbanceRNG 1120 BLM#SOUTH LACLEDE#10610#52954.1021022905 76.92 Acres Construction DisturbanceRNG 1120 BLM#SOUTH LACLEDE#10610#52954.1021022905 6.02 Acres Operation DisturbanceRNG 1120 BLM#SOUTH LACLEDE#10610#52954.1021022905 17.11 Acres Operation DisturbanceRNG 1120 BLM#SOUTH WAMSUTTER#10620#31409.8343562864 0.85 Acres Construction DisturbanceRNG 1120 BLM#SOUTH WAMSUTTER#10620#31409.8343562864 3.38 Acres Construction DisturbanceRNG 1120 BLM#SOUTH WAMSUTTER#10620#31409.8343562864 0.19 Acres Operation DisturbanceRNG 1120 BLM#SOUTH WAMSUTTER#10620#31409.8343562864 0.69 Acres Operation DisturbanceRNG 1120.1 BLM#POWDER RIM ROTATION#10520#47004.957409481 20.91 Acres Construction DisturbanceRNG 1120.1 BLM#POWDER RIM ROTATION#10520#47004.957409481 30.99 Acres Construction DisturbanceRNG 1120.1 BLM#POWDER RIM ROTATION#10520#47004.957409481 6.90 Acres Operation DisturbanceRNG 1120.1 BLM#POWDER RIM ROTATION#10520#47004.957409481 8.56 Acres Operation DisturbanceRNG 1120.1 BLM#ROTTEN SPRINGS#10523#21138.7727522651 2.93 Acres Construction DisturbanceRNG 1120.1 BLM#ROTTEN SPRINGS#10523#21138.7727522651 3.76 Acres Construction DisturbanceRNG 1120.1 BLM#ROTTEN SPRINGS#10523#21138.7727522651 1.23 Acres Operation DisturbanceRNG 1120.1 BLM#ROTTEN SPRINGS#10523#21138.7727522651 1.37 Acres Operation DisturbanceRNG 1120.1 BLM#SAND CREEK#10524#30010.0287397015 0.22 Acres Construction DisturbanceRNG 1120.1 BLM#SAND CREEK#10524#30010.0287397015 0.22 Acres Construction Disturbance

Page 158: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

RNG 1120.1 BLM#SAND CREEK#10524#30010.0287397015 0.12 Acres Operation DisturbanceRNG 1120.1 BLM#SAND CREEK#10524#30010.0287397015 0.12 Acres Operation DisturbanceRNG 1120.2 BLM#POWDER RIM ROTATION#10520#47004.957409481 44.53 Acres Construction DisturbanceRNG 1120.2 BLM#POWDER RIM ROTATION#10520#47004.957409481 44.29 Acres Construction DisturbanceRNG 1120.2 BLM#POWDER RIM ROTATION#10520#47004.957409481 7.34 Acres Operation DisturbanceRNG 1120.2 BLM#POWDER RIM ROTATION#10520#47004.957409481 7.31 Acres Operation DisturbanceRNG 1120.2 BLM#ROTTEN SPRINGS#10523#21138.7727522651 3.14 Acres Construction DisturbanceRNG 1120.2 BLM#ROTTEN SPRINGS#10523#21138.7727522651 3.13 Acres Construction DisturbanceRNG 1120.2 BLM#ROTTEN SPRINGS#10523#21138.7727522651 0.57 Acres Operation DisturbanceRNG 1120.2 BLM#ROTTEN SPRINGS#10523#21138.7727522651 0.57 Acres Operation DisturbanceRNG 1180 BLM#POWDER RIM ROTATION#10520#47004.957409481 60.84 Acres Construction DisturbanceRNG 1180 BLM#POWDER RIM ROTATION#10520#47004.957409481 64.31 Acres Construction DisturbanceRNG 1180 BLM#POWDER RIM ROTATION#10520#47004.957409481 12.39 Acres Operation DisturbanceRNG 1180 BLM#POWDER RIM ROTATION#10520#47004.957409481 12.99 Acres Operation DisturbanceRNG 1187 BLM#Cedar Springs Draw#04402#35489.2829756299 65.95 Acres Construction DisturbanceRNG 1187 BLM#Cedar Springs Draw#04402#35489.2829756299 86.65 Acres Construction DisturbanceRNG 1187 BLM#Cedar Springs Draw#04402#35489.2829756299 14.84 Acres Operation DisturbanceRNG 1187 BLM#Cedar Springs Draw#04402#35489.2829756299 19.57 Acres Operation DisturbanceRNG 1187 BLM#Cross Mtn#04307#21819.3226943626 0.16 Acres Construction DisturbanceRNG 1187 BLM#Cross Mtn#04307#21819.3226943626 0.16 Acres Construction DisturbanceRNG 1187 BLM#Cross Mtn#04307#21819.3226943626 0.07 Acres Operation DisturbanceRNG 1187 BLM#Cross Mtn#04307#21819.3226943626 0.07 Acres Operation DisturbanceRNG 1187 BLM#E Canyon#04429#3227.27178635855 1.81 Acres Construction DisturbanceRNG 1187 BLM#E Canyon#04429#3227.27178635855 1.81 Acres Construction DisturbanceRNG 1187 BLM#E Canyon#04429#3227.27178635855 0.78 Acres Operation DisturbanceRNG 1187 BLM#E Canyon#04429#3227.27178635855 0.78 Acres Operation DisturbanceRNG 1187 BLM#E Powder Wash#04202#27153.8146780555 33.09 Acres Construction DisturbanceRNG 1187 BLM#E Powder Wash#04202#27153.8146780555 34.26 Acres Construction DisturbanceRNG 1187 BLM#E Powder Wash#04202#27153.8146780555 8.31 Acres Operation DisturbanceRNG 1187 BLM#E Powder Wash#04202#27153.8146780555 8.57 Acres Operation DisturbanceRNG 1187 BLM#Grounds#04222#8011.86534829003 26.39 Acres Construction DisturbanceRNG 1187 BLM#Grounds#04222#8011.86534829003 27.66 Acres Construction DisturbanceRNG 1187 BLM#Grounds#04222#8011.86534829003 6.97 Acres Operation DisturbanceRNG 1187 BLM#Grounds#04222#8011.86534829003 7.34 Acres Operation DisturbanceRNG 1187 BLM#Horse Draw#04204#7413.87686231446 24.07 Acres Construction DisturbanceRNG 1187 BLM#Horse Draw#04204#7413.87686231446 24.76 Acres Construction DisturbanceRNG 1187 BLM#Horse Draw#04204#7413.87686231446 6.38 Acres Operation DisturbanceRNG 1187 BLM#Horse Draw#04204#7413.87686231446 6.51 Acres Operation DisturbanceRNG 1187 BLM#Lang Spring#04212#3685.59331660517 4.81 Acres Construction DisturbanceRNG 1187 BLM#Lang Spring#04212#3685.59331660517 5.49 Acres Construction DisturbanceRNG 1187 BLM#Lang Spring#04212#3685.59331660517 2.06 Acres Operation DisturbanceRNG 1187 BLM#Lang Spring#04212#3685.59331660517 2.36 Acres Operation DisturbanceRNG 1187 BLM#Nipple Peak#04225#15560.0003833792 11.58 Acres Construction DisturbanceRNG 1187 BLM#Nipple Peak#04225#15560.0003833792 58.93 Acres Construction DisturbanceRNG 1187 BLM#Nipple Peak#04225#15560.0003833792 3.18 Acres Operation Disturbance

Page 159: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

RNG 1187 BLM#Nipple Peak#04225#15560.0003833792 15.17 Acres Operation DisturbanceRNG 1187 BLM#Nipple Rim#04213#40045.467285138 8.86 Acres Construction DisturbanceRNG 1187 BLM#Nipple Rim#04213#40045.467285138 9.30 Acres Construction DisturbanceRNG 1187 BLM#Nipple Rim#04213#40045.467285138 3.80 Acres Operation DisturbanceRNG 1187 BLM#Nipple Rim#04213#40045.467285138 3.99 Acres Operation DisturbanceRNG 1187 BLM#POWDER RIM ROTATION#10520#47004.957409481 16.48 Acres Construction DisturbanceRNG 1187 BLM#POWDER RIM ROTATION#10520#47004.957409481 17.08 Acres Construction DisturbanceRNG 1187 BLM#POWDER RIM ROTATION#10520#47004.957409481 3.63 Acres Operation DisturbanceRNG 1187 BLM#POWDER RIM ROTATION#10520#47004.957409481 3.74 Acres Operation DisturbanceRNG 1187 BLM#Powder Wash#04214#27431.8147661954 24.74 Acres Construction DisturbanceRNG 1187 BLM#Powder Wash#04214#27431.8147661954 25.76 Acres Construction DisturbanceRNG 1187 BLM#Powder Wash#04214#27431.8147661954 5.35 Acres Operation DisturbanceRNG 1187 BLM#Powder Wash#04214#27431.8147661954 5.57 Acres Operation DisturbanceRNG 1187 BLM#Sand Cr#04207#11437.2914458123 0.70 Acres Construction DisturbanceRNG 1187 BLM#Sand Cr#04207#11437.2914458123 0.74 Acres Construction DisturbanceRNG 1187 BLM#Sand Cr#04207#11437.2914458123 0.30 Acres Operation DisturbanceRNG 1187 BLM#Sand Cr#04207#11437.2914458123 0.32 Acres Operation DisturbanceRNG 1187 BLM#Sand Hills#04407#13932.175964004 0.11 Acres Construction DisturbanceRNG 1187 BLM#Sand Hills#04407#13932.175964004 0.49 Acres Construction DisturbanceRNG 1187 BLM#Sand Hills#04407#13932.175964004 0.05 Acres Operation DisturbanceRNG 1187 BLM#Sand Hills#04407#13932.175964004 0.21 Acres Operation DisturbanceRNG 1187 BLM#Sand Wash#04219#76107.957127674 23.41 Acres Construction DisturbanceRNG 1187 BLM#Sand Wash#04219#76107.957127674 27.59 Acres Construction DisturbanceRNG 1187 BLM#Sand Wash#04219#76107.957127674 5.67 Acres Operation DisturbanceRNG 1187 BLM#Sand Wash#04219#76107.957127674 6.98 Acres Operation DisturbanceRNG 1187 BLM#Sheepherder Spring#04217#86353.8788765607 61.86 Acres Construction DisturbanceRNG 1187 BLM#Sheepherder Spring#04217#86353.8788765607 64.10 Acres Construction DisturbanceRNG 1187 BLM#Sheepherder Spring#04217#86353.8788765607 17.48 Acres Operation DisturbanceRNG 1187 BLM#Sheepherder Spring#04217#86353.8788765607 18.06 Acres Operation DisturbanceRNG 1187 BLM#Snake River#04206#62469.4080464791 128.54 Acres Construction DisturbanceRNG 1187 BLM#Snake River#04206#62469.4080464791 146.37 Acres Construction DisturbanceRNG 1187 BLM#Snake River#04206#62469.4080464791 37.44 Acres Operation DisturbanceRNG 1187 BLM#Snake River#04206#62469.4080464791 41.49 Acres Operation DisturbanceRNG 1187 BLM#Suttles Basin#04209#8182.57831275267 7.36 Acres Construction DisturbanceRNG 1187 BLM#Suttles Basin#04209#8182.57831275267 10.93 Acres Construction DisturbanceRNG 1187 BLM#Suttles Basin#04209#8182.57831275267 3.16 Acres Operation DisturbanceRNG 1187 BLM#Suttles Basin#04209#8182.57831275267 4.69 Acres Operation DisturbanceRNG 1190 BLM#ADAM'S RANCH#10501#305.615886498863 0.13 Acres Construction DisturbanceRNG 1190 BLM#ADAM'S RANCH#10501#305.615886498863 0.92 Acres Construction DisturbanceRNG 1190 BLM#ADAM'S RANCH#10501#305.615886498863 0.05 Acres Operation DisturbanceRNG 1190 BLM#ADAM'S RANCH#10501#305.615886498863 0.37 Acres Operation DisturbanceRNG 1190 BLM#AIRHEART PASTURE#01101#2138.4379851804 0.24 Acres Construction DisturbanceRNG 1190 BLM#AIRHEART PASTURE#01101#2138.4379851804 2.90 Acres Construction DisturbanceRNG 1190 BLM#AIRHEART PASTURE#01101#2138.4379851804 0.09 Acres Operation DisturbanceRNG 1190 BLM#AIRHEART PASTURE#01101#2138.4379851804 1.02 Acres Operation Disturbance

Page 160: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

RNG 1190 BLM#BAGGS SUB UNIT#00403#5100.29616273101 22.20 Acres Construction DisturbanceRNG 1190 BLM#BAGGS SUB UNIT#00403#5100.29616273101 33.97 Acres Construction DisturbanceRNG 1190 BLM#BAGGS SUB UNIT#00403#5100.29616273101 4.76 Acres Operation DisturbanceRNG 1190 BLM#BAGGS SUB UNIT#00403#5100.29616273101 7.28 Acres Operation DisturbanceRNG 1190 BLM#Big Bend#04414#1607.22327248438 26.07 Acres Construction DisturbanceRNG 1190 BLM#Big Bend#04414#1607.22327248438 26.71 Acres Construction DisturbanceRNG 1190 BLM#Big Bend#04414#1607.22327248438 5.13 Acres Operation DisturbanceRNG 1190 BLM#Big Bend#04414#1607.22327248438 5.27 Acres Operation DisturbanceRNG 1190 BLM#BIG ROBBER#10503#17615.5023038054 9.33 Acres Construction DisturbanceRNG 1190 BLM#BIG ROBBER#10503#17615.5023038054 10.53 Acres Construction DisturbanceRNG 1190 BLM#BIG ROBBER#10503#17615.5023038054 3.71 Acres Operation DisturbanceRNG 1190 BLM#BIG ROBBER#10503#17615.5023038054 4.19 Acres Operation DisturbanceRNG 1190 BLM#BRIMMER PASTURES#10721#1375.91979754556 4.60 Acres Construction DisturbanceRNG 1190 BLM#BRIMMER PASTURES#10721#1375.91979754556 21.04 Acres Construction DisturbanceRNG 1190 BLM#BRIMMER PASTURES#10721#1375.91979754556 0.90 Acres Operation DisturbanceRNG 1190 BLM#BRIMMER PASTURES#10721#1375.91979754556 4.09 Acres Operation DisturbanceRNG 1190 BLM#Cedar Springs Draw#04402#35489.2829756299 53.91 Acres Construction DisturbanceRNG 1190 BLM#Cedar Springs Draw#04402#35489.2829756299 79.36 Acres Construction DisturbanceRNG 1190 BLM#Cedar Springs Draw#04402#35489.2829756299 13.66 Acres Operation DisturbanceRNG 1190 BLM#Cedar Springs Draw#04402#35489.2829756299 19.22 Acres Operation DisturbanceRNG 1190 BLM#CEDARS#01135#720.820233630921 0.55 Acres Construction DisturbanceRNG 1190 BLM#CEDARS#01135#720.820233630921 2.58 Acres Construction DisturbanceRNG 1190 BLM#CEDARS#01135#720.820233630921 0.22 Acres Operation DisturbanceRNG 1190 BLM#CEDARS#01135#720.820233630921 0.90 Acres Operation DisturbanceRNG 1190 BLM#CHEROKEE#00408#66547.1494281932 48.02 Acres Construction DisturbanceRNG 1190 BLM#CHEROKEE#00408#66547.1494281932 51.56 Acres Construction DisturbanceRNG 1190 BLM#CHEROKEE#00408#66547.1494281932 13.50 Acres Operation DisturbanceRNG 1190 BLM#CHEROKEE#00408#66547.1494281932 14.40 Acres Operation DisturbanceRNG 1190 BLM#Chicken Sage#04508#4592.79151125191 43.18 Acres Construction DisturbanceRNG 1190 BLM#Chicken Sage#04508#4592.79151125191 43.18 Acres Construction DisturbanceRNG 1190 BLM#Chicken Sage#04508#4592.79151125191 8.62 Acres Operation DisturbanceRNG 1190 BLM#Chicken Sage#04508#4592.79151125191 8.62 Acres Operation DisturbanceRNG 1190 BLM#COAL BANK WASH#10604#7643.93124877525 9.69 Acres Construction DisturbanceRNG 1190 BLM#COAL BANK WASH#10604#7643.93124877525 14.84 Acres Construction DisturbanceRNG 1190 BLM#COAL BANK WASH#10604#7643.93124877525 2.46 Acres Operation DisturbanceRNG 1190 BLM#COAL BANK WASH#10604#7643.93124877525 4.22 Acres Operation DisturbanceRNG 1190 BLM#COTTONWOOD HILL#10508#14568.9684074197 2.56 Acres Construction DisturbanceRNG 1190 BLM#COTTONWOOD HILL#10508#14568.9684074197 3.30 Acres Construction DisturbanceRNG 1190 BLM#COTTONWOOD HILL#10508#14568.9684074197 1.02 Acres Operation DisturbanceRNG 1190 BLM#COTTONWOOD HILL#10508#14568.9684074197 1.31 Acres Operation DisturbanceRNG 1190 BLM#Cutoff Gulch#04047#2016.03585279021 2.70 Acres Construction DisturbanceRNG 1190 BLM#Cutoff Gulch#04047#2016.03585279021 6.46 Acres Construction DisturbanceRNG 1190 BLM#Cutoff Gulch#04047#2016.03585279021 0.57 Acres Operation DisturbanceRNG 1190 BLM#Cutoff Gulch#04047#2016.03585279021 1.56 Acres Operation DisturbanceRNG 1190 BLM#DAD#00442#675.601459864059 1.87 Acres Construction Disturbance

Page 161: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

RNG 1190 BLM#DAD#00442#675.601459864059 1.89 Acres Construction DisturbanceRNG 1190 BLM#DAD#00442#675.601459864059 0.74 Acres Operation DisturbanceRNG 1190 BLM#DAD#00442#675.601459864059 0.75 Acres Operation DisturbanceRNG 1190 BLM#DOTY MOUNTAIN#00415#85635.4768188801 46.22 Acres Construction DisturbanceRNG 1190 BLM#DOTY MOUNTAIN#00415#85635.4768188801 57.33 Acres Construction DisturbanceRNG 1190 BLM#DOTY MOUNTAIN#00415#85635.4768188801 12.71 Acres Operation DisturbanceRNG 1190 BLM#DOTY MOUNTAIN#00415#85635.4768188801 16.21 Acres Operation DisturbanceRNG 1190 BLM#E Godiva#04415#1568.66062469324 1.90 Acres Construction DisturbanceRNG 1190 BLM#E Godiva#04415#1568.66062469324 1.92 Acres Construction DisturbanceRNG 1190 BLM#E Godiva#04415#1568.66062469324 0.76 Acres Operation DisturbanceRNG 1190 BLM#E Godiva#04415#1568.66062469324 0.76 Acres Operation DisturbanceRNG 1190 BLM#E Mud Spring Draw#04509#2395.79555345824 0.04 Acres Construction DisturbanceRNG 1190 BLM#E Mud Spring Draw#04509#2395.79555345824 0.02 Acres Operation DisturbanceRNG 1190 BLM#EAST MUDDY#00443#6178.06748413398 9.36 Acres Construction DisturbanceRNG 1190 BLM#EAST MUDDY#00443#6178.06748413398 11.99 Acres Construction DisturbanceRNG 1190 BLM#EAST MUDDY#00443#6178.06748413398 2.50 Acres Operation DisturbanceRNG 1190 BLM#EAST MUDDY#00443#6178.06748413398 3.03 Acres Operation DisturbanceRNG 1190 BLM#ECHO SPRINGS#10607#45516.5059283292 10.47 Acres Construction DisturbanceRNG 1190 BLM#ECHO SPRINGS#10607#45516.5059283292 29.50 Acres Construction DisturbanceRNG 1190 BLM#ECHO SPRINGS#10607#45516.5059283292 3.08 Acres Operation DisturbanceRNG 1190 BLM#ECHO SPRINGS#10607#45516.5059283292 8.42 Acres Operation DisturbanceRNG 1190 BLM#Fortification Rocks#04501#4192.82494575407 0.00 Acres Construction DisturbanceRNG 1190 BLM#Fortification Rocks#04501#4192.82494575407 16.40 Acres Construction DisturbanceRNG 1190 BLM#Fortification Rocks#04501#4192.82494575407 0.00 Acres Operation DisturbanceRNG 1190 BLM#Fortification Rocks#04501#4192.82494575407 3.00 Acres Operation DisturbanceRNG 1190 BLM#Four Mile#04511#2567.98428454775 29.58 Acres Construction DisturbanceRNG 1190 BLM#Four Mile#04511#2567.98428454775 30.42 Acres Construction DisturbanceRNG 1190 BLM#Four Mile#04511#2567.98428454775 5.77 Acres Operation DisturbanceRNG 1190 BLM#Four Mile#04511#2567.98428454775 6.00 Acres Operation DisturbanceRNG 1190 BLM#GEORGE DEW#10531#1011.43210070837 0.87 Acres Construction DisturbanceRNG 1190 BLM#GEORGE DEW#10531#1011.43210070837 2.76 Acres Construction DisturbanceRNG 1190 BLM#GEORGE DEW#10531#1011.43210070837 0.34 Acres Operation DisturbanceRNG 1190 BLM#GEORGE DEW#10531#1011.43210070837 1.01 Acres Operation DisturbanceRNG 1190 BLM#Gravel Pit#04046#1618.03676611464 8.63 Acres Construction DisturbanceRNG 1190 BLM#Gravel Pit#04046#1618.03676611464 21.46 Acres Construction DisturbanceRNG 1190 BLM#Gravel Pit#04046#1618.03676611464 1.62 Acres Operation DisturbanceRNG 1190 BLM#Gravel Pit#04046#1618.03676611464 4.21 Acres Operation DisturbanceRNG 1190 BLM#GRIEVE PASTURE#00740#2177.85713617658 15.01 Acres Construction DisturbanceRNG 1190 BLM#GRIEVE PASTURE#00740#2177.85713617658 20.46 Acres Construction DisturbanceRNG 1190 BLM#GRIEVE PASTURE#00740#2177.85713617658 3.15 Acres Operation DisturbanceRNG 1190 BLM#GRIEVE PASTURE#00740#2177.85713617658 4.81 Acres Operation DisturbanceRNG 1190 BLM#HEADQUARTERS RANCH#10529#481.536182094129 0.24 Acres Construction DisturbanceRNG 1190 BLM#HEADQUARTERS RANCH#10529#481.536182094129 1.45 Acres Construction DisturbanceRNG 1190 BLM#HEADQUARTERS RANCH#10529#481.536182094129 0.10 Acres Operation DisturbanceRNG 1190 BLM#HEADQUARTERS RANCH#10529#481.536182094129 0.58 Acres Operation Disturbance

Page 162: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

RNG 1190 BLM#Horse Gulch Sect 15#04065#37277.5316323244 21.06 Acres Construction DisturbanceRNG 1190 BLM#Horse Gulch Sect 15#04065#37277.5316323244 152.36 Acres Construction DisturbanceRNG 1190 BLM#Horse Gulch Sect 15#04065#37277.5316323244 4.56 Acres Operation DisturbanceRNG 1190 BLM#Horse Gulch Sect 15#04065#37277.5316323244 32.91 Acres Operation DisturbanceRNG 1190 BLM#Juniper Mtn#04412#13417.7473339474 25.25 Acres Construction DisturbanceRNG 1190 BLM#Juniper Mtn#04412#13417.7473339474 41.40 Acres Construction DisturbanceRNG 1190 BLM#Juniper Mtn#04412#13417.7473339474 5.74 Acres Operation DisturbanceRNG 1190 BLM#Juniper Mtn#04412#13417.7473339474 9.01 Acres Operation DisturbanceRNG 1190 BLM#Lay Cr#04413#2788.30762254716 28.22 Acres Construction DisturbanceRNG 1190 BLM#Lay Cr#04413#2788.30762254716 31.14 Acres Construction DisturbanceRNG 1190 BLM#Lay Cr#04413#2788.30762254716 5.48 Acres Operation DisturbanceRNG 1190 BLM#Lay Cr#04413#2788.30762254716 6.41 Acres Operation DisturbanceRNG 1190 BLM#Lay Peak Com#04436#1680.08974971689 1.84 Acres Construction DisturbanceRNG 1190 BLM#Lay Peak Com#04436#1680.08974971689 14.94 Acres Construction DisturbanceRNG 1190 BLM#Lay Peak Com#04436#1680.08974971689 0.35 Acres Operation DisturbanceRNG 1190 BLM#Lay Peak Com#04436#1680.08974971689 3.02 Acres Operation DisturbanceRNG 1190 BLM#Lay Peak#04406#1812.49513059099 1.72 Acres Construction DisturbanceRNG 1190 BLM#Lay Peak#04406#1812.49513059099 2.49 Acres Construction DisturbanceRNG 1190 BLM#Lay Peak#04406#1812.49513059099 0.69 Acres Operation DisturbanceRNG 1190 BLM#Lay Peak#04406#1812.49513059099 0.99 Acres Operation DisturbanceRNG 1190 BLM#LAZY Y S RANCH#10626#17873.1640766051 4.83 Acres Construction DisturbanceRNG 1190 BLM#LAZY Y S RANCH#10626#17873.1640766051 11.09 Acres Construction DisturbanceRNG 1190 BLM#LAZY Y S RANCH#10626#17873.1640766051 1.92 Acres Operation DisturbanceRNG 1190 BLM#LAZY Y S RANCH#10626#17873.1640766051 4.42 Acres Operation DisturbanceRNG 1190 BLM#Little Juniper#04434#2656.82626819759 24.92 Acres Construction DisturbanceRNG 1190 BLM#Little Juniper#04434#2656.82626819759 25.44 Acres Construction DisturbanceRNG 1190 BLM#Little Juniper#04434#2656.82626819759 4.93 Acres Operation DisturbanceRNG 1190 BLM#Little Juniper#04434#2656.82626819759 5.13 Acres Operation DisturbanceRNG 1190 BLM#LITTLE ROBBER#00514#507.767191766705 1.20 Acres Construction DisturbanceRNG 1190 BLM#LITTLE ROBBER#00514#507.767191766705 1.20 Acres Construction DisturbanceRNG 1190 BLM#LITTLE ROBBER#00514#507.767191766705 0.48 Acres Operation DisturbanceRNG 1190 BLM#LITTLE ROBBER#00514#507.767191766705 0.48 Acres Operation DisturbanceRNG 1190 BLM#Lower Fortification#04506#1968.07780358622 25.71 Acres Construction DisturbanceRNG 1190 BLM#Lower Fortification#04506#1968.07780358622 26.05 Acres Construction DisturbanceRNG 1190 BLM#Lower Fortification#04506#1968.07780358622 4.76 Acres Operation DisturbanceRNG 1190 BLM#Lower Fortification#04506#1968.07780358622 4.88 Acres Operation DisturbanceRNG 1190 BLM#Lower Willow Cr#04038#294.240557629831 0.10 Acres Construction DisturbanceRNG 1190 BLM#Lower Willow Cr#04038#294.240557629831 0.04 Acres Operation DisturbanceRNG 1190 BLM#MEXICAN FLATS#10515#15503.6968595568 7.00 Acres Construction DisturbanceRNG 1190 BLM#MEXICAN FLATS#10515#15503.6968595568 2.79 Acres Operation DisturbanceRNG 1190 BLM#MEXICAN FLATS#10515#15503.6968595568 2.79 Acres Operation DisturbanceRNG 1190 BLM#MEXICAN GRAVES#10516#20269.7736397382 2.05 Acres Construction DisturbanceRNG 1190 BLM#MEXICAN GRAVES#10516#20269.7736397382 2.30 Acres Construction DisturbanceRNG 1190 BLM#MEXICAN GRAVES#10516#20269.7736397382 0.82 Acres Operation DisturbanceRNG 1190 BLM#MEXICAN GRAVES#10516#20269.7736397382 0.91 Acres Operation Disturbance

Page 163: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

RNG 1190 BLM#N Big Bottom#04068#159.884726731769 0.12 Acres Construction DisturbanceRNG 1190 BLM#N Big Bottom#04068#159.884726731769 0.48 Acres Construction DisturbanceRNG 1190 BLM#N Big Bottom#04068#159.884726731769 0.05 Acres Operation DisturbanceRNG 1190 BLM#N Big Bottom#04068#159.884726731769 0.19 Acres Operation DisturbanceRNG 1190 BLM#N Deception Cr#04408#13028.1431857296 16.07 Acres Construction DisturbanceRNG 1190 BLM#N Deception Cr#04408#13028.1431857296 82.79 Acres Construction DisturbanceRNG 1190 BLM#N Deception Cr#04408#13028.1431857296 4.30 Acres Operation DisturbanceRNG 1190 BLM#N Deception Cr#04408#13028.1431857296 18.60 Acres Operation DisturbanceRNG 1190 BLM#NORTH BAGGS#10624#1016.46255616783 5.90 Acres Construction DisturbanceRNG 1190 BLM#NORTH BAGGS#10624#1016.46255616783 18.45 Acres Construction DisturbanceRNG 1190 BLM#NORTH BAGGS#10624#1016.46255616783 1.20 Acres Operation DisturbanceRNG 1190 BLM#NORTH BAGGS#10624#1016.46255616783 3.65 Acres Operation DisturbanceRNG 1190 BLM#NORTH PINE BUTTE#10612#2323.61928539983 3.22 Acres Construction DisturbanceRNG 1190 BLM#NORTH PINE BUTTE#10612#2323.61928539983 11.41 Acres Construction DisturbanceRNG 1190 BLM#NORTH PINE BUTTE#10612#2323.61928539983 0.98 Acres Operation DisturbanceRNG 1190 BLM#NORTH PINE BUTTE#10612#2323.61928539983 2.83 Acres Operation DisturbanceRNG 1190 BLM#POLING ISO TRACT#01122#847.690758211173 0.29 Acres Construction DisturbanceRNG 1190 BLM#POLING ISO TRACT#01122#847.690758211173 0.11 Acres Operation DisturbanceRNG 1190 BLM#RINER#10615#56016.0380749799 17.80 Acres Construction DisturbanceRNG 1190 BLM#RINER#10615#56016.0380749799 34.64 Acres Construction DisturbanceRNG 1190 BLM#RINER#10615#56016.0380749799 4.67 Acres Operation DisturbanceRNG 1190 BLM#RINER#10615#56016.0380749799 8.90 Acres Operation DisturbanceRNG 1190 BLM#Round Mtn#00014#1434.24797702936 0.12 Acres Construction DisturbanceRNG 1190 BLM#Round Mtn#00014#1434.24797702936 0.12 Acres Construction DisturbanceRNG 1190 BLM#Round Mtn#00014#1434.24797702936 0.05 Acres Operation DisturbanceRNG 1190 BLM#Round Mtn#00014#1434.24797702936 0.05 Acres Operation DisturbanceRNG 1190 BLM#S Deception#04409#15933.8888426738 0.15 Acres Construction DisturbanceRNG 1190 BLM#S Deception#04409#15933.8888426738 5.83 Acres Construction DisturbanceRNG 1190 BLM#S Deception#04409#15933.8888426738 0.06 Acres Operation DisturbanceRNG 1190 BLM#S Deception#04409#15933.8888426738 2.32 Acres Operation DisturbanceRNG 1190 BLM#Sand Hills#04407#13932.175964004 1.30 Acres Construction DisturbanceRNG 1190 BLM#Sand Hills#04407#13932.175964004 1.55 Acres Construction DisturbanceRNG 1190 BLM#Sand Hills#04407#13932.175964004 0.52 Acres Operation DisturbanceRNG 1190 BLM#Sand Hills#04407#13932.175964004 0.62 Acres Operation DisturbanceRNG 1190 BLM#Serviceberry Mtn#04039#3028.29981719905 0.65 Acres Construction DisturbanceRNG 1190 BLM#Serviceberry Mtn#04039#3028.29981719905 0.65 Acres Construction DisturbanceRNG 1190 BLM#Serviceberry Mtn#04039#3028.29981719905 0.26 Acres Operation DisturbanceRNG 1190 BLM#Serviceberry Mtn#04039#3028.29981719905 0.26 Acres Operation DisturbanceRNG 1190 BLM#SOUTH LACLEDE#10610#52954.1021022905 1.29 Acres Construction DisturbanceRNG 1190 BLM#SOUTH LACLEDE#10610#52954.1021022905 1.32 Acres Construction DisturbanceRNG 1190 BLM#SOUTH LACLEDE#10610#52954.1021022905 0.51 Acres Operation DisturbanceRNG 1190 BLM#SOUTH LACLEDE#10610#52954.1021022905 0.53 Acres Operation DisturbanceRNG 1190 BLM#SOUTH MUDDY#10530#1570.14463350626 7.81 Acres Construction DisturbanceRNG 1190 BLM#SOUTH MUDDY#10530#1570.14463350626 7.81 Acres Construction DisturbanceRNG 1190 BLM#SOUTH MUDDY#10530#1570.14463350626 2.03 Acres Operation Disturbance

Page 164: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

RNG 1190 BLM#SOUTH MUDDY#10530#1570.14463350626 2.03 Acres Operation DisturbanceRNG 1190 BLM#SOUTH PASTURE#01130#5974.77714723228 2.60 Acres Construction DisturbanceRNG 1190 BLM#SOUTH PASTURE#01130#5974.77714723228 43.28 Acres Construction DisturbanceRNG 1190 BLM#SOUTH PASTURE#01130#5974.77714723228 0.72 Acres Operation DisturbanceRNG 1190 BLM#SOUTH PASTURE#01130#5974.77714723228 8.82 Acres Operation DisturbanceRNG 1190 BLM#SOUTH PINE BUTTE#10625#968.290809881927 2.89 Acres Construction DisturbanceRNG 1190 BLM#SOUTH PINE BUTTE#10625#968.290809881927 6.47 Acres Construction DisturbanceRNG 1190 BLM#SOUTH PINE BUTTE#10625#968.290809881927 0.57 Acres Operation DisturbanceRNG 1190 BLM#SOUTH PINE BUTTE#10625#968.290809881927 1.60 Acres Operation DisturbanceRNG 1190 BLM#State Block EU#04578#12811.9451738162 0.04 Acres Construction DisturbanceRNG 1190 BLM#State Block EU#04578#12811.9451738162 104.87 Acres Construction DisturbanceRNG 1190 BLM#State Block EU#04578#12811.9451738162 0.02 Acres Operation DisturbanceRNG 1190 BLM#State Block EU#04578#12811.9451738162 21.50 Acres Operation DisturbanceRNG 1190 BLM#Upper Four Mile#04500#4789.96440507211 1.09 Acres Construction DisturbanceRNG 1190 BLM#Upper Four Mile#04500#4789.96440507211 1.09 Acres Construction DisturbanceRNG 1190 BLM#Upper Four Mile#04500#4789.96440507211 0.43 Acres Operation DisturbanceRNG 1190 BLM#Upper Four Mile#04500#4789.96440507211 0.44 Acres Operation DisturbanceRNG 1190 BLM#V SPREADERS#10527#337.229450481208 1.01 Acres Construction DisturbanceRNG 1190 BLM#V SPREADERS#10527#337.229450481208 1.01 Acres Construction DisturbanceRNG 1190 BLM#V SPREADERS#10527#337.229450481208 0.40 Acres Operation DisturbanceRNG 1190 BLM#V SPREADERS#10527#337.229450481208 0.40 Acres Operation DisturbanceRNG 1190 BLM#W Big Bottom#04066#1497.52517197175 0.00 Acres Construction DisturbanceRNG 1190 BLM#W Big Bottom#04066#1497.52517197175 0.35 Acres Construction DisturbanceRNG 1190 BLM#W Big Bottom#04066#1497.52517197175 0.00 Acres Operation DisturbanceRNG 1190 BLM#W Big Bottom#04066#1497.52517197175 0.14 Acres Operation DisturbanceRNG 1190 BLM#W Four Mile#04513#4278.86244460731 0.38 Acres Construction DisturbanceRNG 1190 BLM#W Four Mile#04513#4278.86244460731 0.39 Acres Construction DisturbanceRNG 1190 BLM#W Four Mile#04513#4278.86244460731 0.15 Acres Operation DisturbanceRNG 1190 BLM#W Four Mile#04513#4278.86244460731 0.16 Acres Operation DisturbanceRNG 1190 BLM#Wagon Tongue#04512#1126.17070471678 0.93 Acres Construction DisturbanceRNG 1190 BLM#Wagon Tongue#04512#1126.17070471678 0.94 Acres Construction DisturbanceRNG 1190 BLM#Wagon Tongue#04512#1126.17070471678 0.33 Acres Operation DisturbanceRNG 1190 BLM#Wagon Tongue#04512#1126.17070471678 0.33 Acres Operation DisturbanceRNG 1190 BLM#Wymore Gulch#04085#645.391177084926 0.87 Acres Construction DisturbanceRNG 1190 BLM#Wymore Gulch#04085#645.391177084926 1.26 Acres Construction DisturbanceRNG 1190 BLM#Wymore Gulch#04085#645.391177084926 0.35 Acres Operation DisturbanceRNG 1190 BLM#Wymore Gulch#04085#645.391177084926 0.50 Acres Operation DisturbanceRNG 1190 BLM#Yampa#04439#1060.39173306429 0.01 Acres Construction DisturbanceRNG 1190 BLM#Yampa#04439#1060.39173306429 0.03 Acres Construction DisturbanceRNG 1190 BLM#Yampa#04439#1060.39173306429 0.01 Acres Operation DisturbanceRNG 1190 BLM#Yampa#04439#1060.39173306429 0.01 Acres Operation DisturbanceRNG 1210 BLM#Artesia#06308#48931.6815573765 87.19 Acres Construction DisturbanceRNG 1210 BLM#Artesia#06308#48931.6815573765 110.65 Acres Construction DisturbanceRNG 1210 BLM#Artesia#06308#48931.6815573765 17.60 Acres Operation DisturbanceRNG 1210 BLM#Artesia#06308#48931.6815573765 21.84 Acres Operation Disturbance

Page 165: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

RNG 1210 BLM#Cassion#06375#2523.06614582391 0.22 Acres Construction DisturbanceRNG 1210 BLM#Cassion#06375#2523.06614582391 0.10 Acres Operation DisturbanceRNG 1210 BLM#K Ranch#06307#62579.0944049467 0.03 Acres Construction DisturbanceRNG 1210 BLM#K Ranch#06307#62579.0944049467 4.92 Acres Construction DisturbanceRNG 1210 BLM#K Ranch#06307#62579.0944049467 0.00 Acres Operation DisturbanceRNG 1210 BLM#K Ranch#06307#62579.0944049467 1.31 Acres Operation DisturbanceRNG 1210 BLM#Massadona#06324#10870.9226002101 19.00 Acres Construction DisturbanceRNG 1210 BLM#Massadona#06324#10870.9226002101 38.69 Acres Construction DisturbanceRNG 1210 BLM#Massadona#06324#10870.9226002101 3.87 Acres Operation DisturbanceRNG 1210 BLM#Massadona#06324#10870.9226002101 7.37 Acres Operation DisturbanceRNG 1210 BLM#Miller Cr#06373#4002.90227113285 31.40 Acres Construction DisturbanceRNG 1210 BLM#Miller Cr#06373#4002.90227113285 32.60 Acres Construction DisturbanceRNG 1210 BLM#Miller Cr#06373#4002.90227113285 4.71 Acres Operation DisturbanceRNG 1210 BLM#Miller Cr#06373#4002.90227113285 5.24 Acres Operation DisturbanceRNG 1210 BLM#Red Wash#06320#8218.88569045286 7.12 Acres Construction DisturbanceRNG 1210 BLM#Red Wash#06320#8218.88569045286 7.13 Acres Construction DisturbanceRNG 1210 BLM#Red Wash#06320#8218.88569045286 3.31 Acres Operation DisturbanceRNG 1210 BLM#Red Wash#06320#8218.88569045286 3.32 Acres Operation DisturbanceRNG 1210 BLM#Rock Wall Draw#06321#3095.1160395687 3.46 Acres Construction DisturbanceRNG 1210 BLM#Rock Wall Draw#06321#3095.1160395687 4.39 Acres Construction DisturbanceRNG 1210 BLM#Rock Wall Draw#06321#3095.1160395687 1.22 Acres Operation DisturbanceRNG 1210 BLM#Rock Wall Draw#06321#3095.1160395687 1.64 Acres Operation DisturbanceRNG 1210 BLM#SNAKE JOHN#15860#10680.3156627641 0.19 Acres Construction DisturbanceRNG 1210 BLM#SNAKE JOHN#15860#10680.3156627641 0.19 Acres Construction DisturbanceRNG 1210 BLM#SNAKE JOHN#15860#10680.3156627641 0.05 Acres Operation DisturbanceRNG 1210 BLM#SNAKE JOHN#15860#10680.3156627641 0.05 Acres Operation DisturbanceRNG 1210 BLM#Spooky Mtn#06316#29666.2451367339 59.02 Acres Construction DisturbanceRNG 1210 BLM#Spooky Mtn#06316#29666.2451367339 86.11 Acres Construction DisturbanceRNG 1210 BLM#Spooky Mtn#06316#29666.2451367339 12.35 Acres Operation DisturbanceRNG 1210 BLM#Spooky Mtn#06316#29666.2451367339 16.59 Acres Operation DisturbanceRNG 1210 BLM#Unalloted#99999#67604.7607835773 0.00 Acres Construction DisturbanceRNG 1210 BLM#Unalloted#99999#67604.7607835773 9.66 Acres Construction DisturbanceRNG 1210 BLM#Unalloted#99999#67604.7607835773 0.00 Acres Operation DisturbanceRNG 1210 BLM#Unalloted#99999#67604.7607835773 0.86 Acres Operation DisturbanceRNG 1210 BLM#White River Trail#06699#927.974476726167 7.15 Acres Construction DisturbanceRNG 1210 BLM#White River Trail#06699#927.974476726167 7.60 Acres Construction DisturbanceRNG 1210 BLM#White River Trail#06699#927.974476726167 0.85 Acres Operation DisturbanceRNG 1210 BLM#White River Trail#06699#927.974476726167 0.97 Acres Operation DisturbanceRNG 1211 BLM#ANTELOPE DRAW#15854#55903.9615142327 0.15 Acres Construction DisturbanceRNG 1211 BLM#ANTELOPE DRAW#15854#55903.9615142327 0.15 Acres Construction DisturbanceRNG 1211 BLM#ANTELOPE DRAW#15854#55903.9615142327 0.04 Acres Operation DisturbanceRNG 1211 BLM#ANTELOPE DRAW#15854#55903.9615142327 0.04 Acres Operation DisturbanceRNG 1211 BLM#Artesia#06308#48931.6815573765 0.01 Acres Construction DisturbanceRNG 1211 BLM#Artesia#06308#48931.6815573765 0.01 Acres Construction DisturbanceRNG 1211 BLM#Artesia#06308#48931.6815573765 0.00 Acres Operation Disturbance

Page 166: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

RNG 1211 BLM#Artesia#06308#48931.6815573765 0.00 Acres Operation DisturbanceRNG 1211 BLM#COYOTE WASH#02945#107987.958756265 0.42 Acres Construction DisturbanceRNG 1211 BLM#COYOTE WASH#02945#107987.958756265 0.42 Acres Construction DisturbanceRNG 1211 BLM#COYOTE WASH#02945#107987.958756265 0.13 Acres Operation DisturbanceRNG 1211 BLM#COYOTE WASH#02945#107987.958756265 0.13 Acres Operation DisturbanceRNG 1211 BLM#POWDER WASH#15857#26783.3085653927 67.26 Acres Construction DisturbanceRNG 1211 BLM#POWDER WASH#15857#26783.3085653927 72.78 Acres Construction DisturbanceRNG 1211 BLM#POWDER WASH#15857#26783.3085653927 15.73 Acres Operation DisturbanceRNG 1211 BLM#POWDER WASH#15857#26783.3085653927 16.99 Acres Operation DisturbanceRNG 1211 BLM#SNAKE JOHN#15860#10680.3156627641 28.40 Acres Construction DisturbanceRNG 1211 BLM#SNAKE JOHN#15860#10680.3156627641 29.59 Acres Construction DisturbanceRNG 1211 BLM#SNAKE JOHN#15860#10680.3156627641 6.50 Acres Operation DisturbanceRNG 1211 BLM#SNAKE JOHN#15860#10680.3156627641 6.75 Acres Operation DisturbanceRNG 1212 BLM#ANTELOPE DRAW#15854#55903.9615142327 0.29 Acres Construction DisturbanceRNG 1212 BLM#ANTELOPE DRAW#15854#55903.9615142327 0.29 Acres Construction DisturbanceRNG 1212 BLM#ANTELOPE DRAW#15854#55903.9615142327 0.20 Acres Operation DisturbanceRNG 1212 BLM#ANTELOPE DRAW#15854#55903.9615142327 0.20 Acres Operation DisturbanceRNG 1212 BLM#POWDER WASH#15857#26783.3085653927 0.88 Acres Construction DisturbanceRNG 1212 BLM#POWDER WASH#15857#26783.3085653927 0.88 Acres Construction DisturbanceRNG 1212 BLM#POWDER WASH#15857#26783.3085653927 0.24 Acres Operation DisturbanceRNG 1212 BLM#POWDER WASH#15857#26783.3085653927 0.24 Acres Operation DisturbanceRNG 1212 BLM#SPLIT MOUNTAIN#03111#120800.283699591 175.82 Acres Construction DisturbanceRNG 1212 BLM#SPLIT MOUNTAIN#03111#120800.283699591 187.48 Acres Construction DisturbanceRNG 1212 BLM#SPLIT MOUNTAIN#03111#120800.283699591 70.85 Acres Operation DisturbanceRNG 1212 BLM#SPLIT MOUNTAIN#03111#120800.283699591 76.70 Acres Operation DisturbanceRNG 1212 BLM#WALKER HOLLOW#05839#10518.1847177573 38.43 Acres Construction DisturbanceRNG 1212 BLM#WALKER HOLLOW#05839#10518.1847177573 38.43 Acres Construction DisturbanceRNG 1212 BLM#WALKER HOLLOW#05839#10518.1847177573 15.72 Acres Operation DisturbanceRNG 1212 BLM#WALKER HOLLOW#05839#10518.1847177573 15.72 Acres Operation DisturbanceRNG 1214 BLM#Artesia#06308#48931.6815573765 0.79 Acres Construction DisturbanceRNG 1214 BLM#Artesia#06308#48931.6815573765 0.79 Acres Construction DisturbanceRNG 1214 BLM#Artesia#06308#48931.6815573765 0.17 Acres Operation DisturbanceRNG 1214 BLM#Artesia#06308#48931.6815573765 0.17 Acres Operation DisturbanceRNG 1214 BLM#POWDER WASH#15857#26783.3085653927 65.29 Acres Construction DisturbanceRNG 1214 BLM#POWDER WASH#15857#26783.3085653927 98.70 Acres Construction DisturbanceRNG 1214 BLM#POWDER WASH#15857#26783.3085653927 15.98 Acres Operation DisturbanceRNG 1214 BLM#POWDER WASH#15857#26783.3085653927 22.98 Acres Operation DisturbanceRNG 1214 BLM#SNAKE JOHN#15860#10680.3156627641 33.23 Acres Construction DisturbanceRNG 1214 BLM#SNAKE JOHN#15860#10680.3156627641 44.55 Acres Construction DisturbanceRNG 1214 BLM#SNAKE JOHN#15860#10680.3156627641 7.23 Acres Operation DisturbanceRNG 1214 BLM#SNAKE JOHN#15860#10680.3156627641 9.87 Acres Operation DisturbanceRNG 1214 BLM#SPLIT MOUNTAIN#03111#120800.283699591 1.40 Acres Construction DisturbanceRNG 1214 BLM#SPLIT MOUNTAIN#03111#120800.283699591 1.40 Acres Construction DisturbanceRNG 1214 BLM#SPLIT MOUNTAIN#03111#120800.283699591 0.60 Acres Operation DisturbanceRNG 1214 BLM#SPLIT MOUNTAIN#03111#120800.283699591 0.60 Acres Operation Disturbance

Page 167: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

RNG 1215 BLM#ANTELOPE DRAW#15854#55903.9615142327 72.94 Acres Construction DisturbanceRNG 1215 BLM#ANTELOPE DRAW#15854#55903.9615142327 81.04 Acres Construction DisturbanceRNG 1215 BLM#ANTELOPE DRAW#15854#55903.9615142327 16.02 Acres Operation DisturbanceRNG 1215 BLM#ANTELOPE DRAW#15854#55903.9615142327 17.78 Acres Operation DisturbanceRNG 1215 BLM#POWDER WASH#15857#26783.3085653927 1.88 Acres Construction DisturbanceRNG 1215 BLM#POWDER WASH#15857#26783.3085653927 1.88 Acres Construction DisturbanceRNG 1215 BLM#POWDER WASH#15857#26783.3085653927 0.41 Acres Operation DisturbanceRNG 1215 BLM#POWDER WASH#15857#26783.3085653927 0.41 Acres Operation DisturbanceRNG 1215 BLM#SPLIT MOUNTAIN#03111#120800.283699591 9.56 Acres Construction DisturbanceRNG 1215 BLM#SPLIT MOUNTAIN#03111#120800.283699591 9.56 Acres Construction DisturbanceRNG 1215 BLM#SPLIT MOUNTAIN#03111#120800.283699591 2.19 Acres Operation DisturbanceRNG 1215 BLM#SPLIT MOUNTAIN#03111#120800.283699591 2.19 Acres Operation DisturbanceRNG 1215.05 BLM#ANTELOPE DRAW#15854#55903.9615142327 79.68 Acres Construction DisturbanceRNG 1215.05 BLM#ANTELOPE DRAW#15854#55903.9615142327 82.07 Acres Construction DisturbanceRNG 1215.05 BLM#ANTELOPE DRAW#15854#55903.9615142327 22.89 Acres Operation DisturbanceRNG 1215.05 BLM#ANTELOPE DRAW#15854#55903.9615142327 24.13 Acres Operation DisturbanceRNG 1215.05 BLM#SPLIT MOUNTAIN#03111#120800.283699591 56.58 Acres Construction DisturbanceRNG 1215.05 BLM#SPLIT MOUNTAIN#03111#120800.283699591 58.62 Acres Construction DisturbanceRNG 1215.05 BLM#SPLIT MOUNTAIN#03111#120800.283699591 17.77 Acres Operation DisturbanceRNG 1215.05 BLM#SPLIT MOUNTAIN#03111#120800.283699591 18.83 Acres Operation DisturbanceRNG 1217.01 BLM#ANTELOPE DRAW#15854#55903.9615142327 75.29 Acres Construction DisturbanceRNG 1217.01 BLM#ANTELOPE DRAW#15854#55903.9615142327 85.47 Acres Construction DisturbanceRNG 1217.01 BLM#ANTELOPE DRAW#15854#55903.9615142327 21.42 Acres Operation DisturbanceRNG 1217.01 BLM#ANTELOPE DRAW#15854#55903.9615142327 23.49 Acres Operation DisturbanceRNG 1217.01 BLM#ARGYLE RIDGE#04873#20708.8718368034 24.08 Acres Construction DisturbanceRNG 1217.01 BLM#ARGYLE RIDGE#04873#20708.8718368034 34.47 Acres Construction DisturbanceRNG 1217.01 BLM#ARGYLE RIDGE#04873#20708.8718368034 5.44 Acres Operation DisturbanceRNG 1217.01 BLM#ARGYLE RIDGE#04873#20708.8718368034 7.70 Acres Operation DisturbanceRNG 1217.01 BLM#BIG WASH#05881#5366.53077568643 18.25 Acres Construction DisturbanceRNG 1217.01 BLM#BIG WASH#05881#5366.53077568643 21.28 Acres Construction DisturbanceRNG 1217.01 BLM#BIG WASH#05881#5366.53077568643 5.99 Acres Operation DisturbanceRNG 1217.01 BLM#BIG WASH#05881#5366.53077568643 6.95 Acres Operation DisturbanceRNG 1217.01 BLM#CASTLE PEAK#05886#51824.187798166 24.71 Acres Construction DisturbanceRNG 1217.01 BLM#CASTLE PEAK#05886#51824.187798166 28.74 Acres Construction DisturbanceRNG 1217.01 BLM#CASTLE PEAK#05886#51824.187798166 7.73 Acres Operation DisturbanceRNG 1217.01 BLM#CASTLE PEAK#05886#51824.187798166 8.94 Acres Operation DisturbanceRNG 1217.01 BLM#COYOTE WASH#02945#107987.958756265 36.75 Acres Construction DisturbanceRNG 1217.01 BLM#COYOTE WASH#02945#107987.958756265 45.76 Acres Construction DisturbanceRNG 1217.01 BLM#COYOTE WASH#02945#107987.958756265 10.17 Acres Operation DisturbanceRNG 1217.01 BLM#COYOTE WASH#02945#107987.958756265 12.35 Acres Operation DisturbanceRNG 1217.01 BLM#CURRANT CANYON#04877#6974.61797217022 25.86 Acres Construction DisturbanceRNG 1217.01 BLM#CURRANT CANYON#04877#6974.61797217022 29.22 Acres Construction DisturbanceRNG 1217.01 BLM#CURRANT CANYON#04877#6974.61797217022 6.38 Acres Operation DisturbanceRNG 1217.01 BLM#CURRANT CANYON#04877#6974.61797217022 6.94 Acres Operation DisturbanceRNG 1217.01 BLM#DEVILS CANYON#04882#22351.1713027084 16.79 Acres Construction Disturbance

Page 168: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

RNG 1217.01 BLM#DEVILS CANYON#04882#22351.1713027084 18.17 Acres Construction DisturbanceRNG 1217.01 BLM#DEVILS CANYON#04882#22351.1713027084 5.52 Acres Operation DisturbanceRNG 1217.01 BLM#DEVILS CANYON#04882#22351.1713027084 5.75 Acres Operation DisturbanceRNG 1217.01 BLM#FIVE MILE#04874#15622.2020947791 50.05 Acres Construction DisturbanceRNG 1217.01 BLM#FIVE MILE#04874#15622.2020947791 64.76 Acres Construction DisturbanceRNG 1217.01 BLM#FIVE MILE#04874#15622.2020947791 13.28 Acres Operation DisturbanceRNG 1217.01 BLM#FIVE MILE#04874#15622.2020947791 16.81 Acres Operation DisturbanceRNG 1217.01 BLM#GREEN RIVER AMP#08803#9607.98995326711 3.19 Acres Construction DisturbanceRNG 1217.01 BLM#GREEN RIVER AMP#08803#9607.98995326711 3.73 Acres Construction DisturbanceRNG 1217.01 BLM#GREEN RIVER AMP#08803#9607.98995326711 0.96 Acres Operation DisturbanceRNG 1217.01 BLM#GREEN RIVER AMP#08803#9607.98995326711 1.07 Acres Operation DisturbanceRNG 1217.01 BLM#GREEN RIVER BOTTOMS#15878#7158.5829545848 13.90 Acres Construction DisturbanceRNG 1217.01 BLM#GREEN RIVER BOTTOMS#15878#7158.5829545848 18.02 Acres Construction DisturbanceRNG 1217.01 BLM#GREEN RIVER BOTTOMS#15878#7158.5829545848 3.59 Acres Operation DisturbanceRNG 1217.01 BLM#GREEN RIVER BOTTOMS#15878#7158.5829545848 4.58 Acres Operation DisturbanceRNG 1217.01 BLM#LEARS CANYON#04875#10708.4972119278 5.88 Acres Construction DisturbanceRNG 1217.01 BLM#LEARS CANYON#04875#10708.4972119278 11.56 Acres Construction DisturbanceRNG 1217.01 BLM#LEARS CANYON#04875#10708.4972119278 1.49 Acres Operation DisturbanceRNG 1217.01 BLM#LEARS CANYON#04875#10708.4972119278 2.70 Acres Operation DisturbanceRNG 1217.01 BLM#LITTLE DESERT#05880#49360.9851188856 169.03 Acres Construction DisturbanceRNG 1217.01 BLM#LITTLE DESERT#05880#49360.9851188856 210.71 Acres Construction DisturbanceRNG 1217.01 BLM#LITTLE DESERT#05880#49360.9851188856 46.08 Acres Operation DisturbanceRNG 1217.01 BLM#LITTLE DESERT#05880#49360.9851188856 55.31 Acres Operation DisturbanceRNG 1217.01 BLM#OLSEN AMP#08816#133987.641393422 8.19 Acres Construction DisturbanceRNG 1217.01 BLM#OLSEN AMP#08816#133987.641393422 26.93 Acres Construction DisturbanceRNG 1217.01 BLM#OLSEN AMP#08816#133987.641393422 2.45 Acres Operation DisturbanceRNG 1217.01 BLM#OLSEN AMP#08816#133987.641393422 7.16 Acres Operation DisturbanceRNG 1217.01 BLM#PARLEYS CANYON#04883#16340.8965328354 115.50 Acres Construction DisturbanceRNG 1217.01 BLM#PARLEYS CANYON#04883#16340.8965328354 146.70 Acres Construction DisturbanceRNG 1217.01 BLM#PARLEYS CANYON#04883#16340.8965328354 24.82 Acres Operation DisturbanceRNG 1217.01 BLM#PARLEYS CANYON#04883#16340.8965328354 30.57 Acres Operation DisturbanceRNG 1217.01 BLM#SAND WASH#08818#74352.385335153 36.60 Acres Construction DisturbanceRNG 1217.01 BLM#SAND WASH#08818#74352.385335153 105.28 Acres Construction DisturbanceRNG 1217.01 BLM#SAND WASH#08818#74352.385335153 11.97 Acres Operation DisturbanceRNG 1217.01 BLM#SAND WASH#08818#74352.385335153 29.92 Acres Operation DisturbanceRNG 1217.01 BLM#SEVEN SISTERS#15845#18787.0846993286 60.28 Acres Construction DisturbanceRNG 1217.01 BLM#SEVEN SISTERS#15845#18787.0846993286 67.54 Acres Construction DisturbanceRNG 1217.01 BLM#SEVEN SISTERS#15845#18787.0846993286 15.83 Acres Operation DisturbanceRNG 1217.01 BLM#SEVEN SISTERS#15845#18787.0846993286 17.04 Acres Operation DisturbanceRNG 1217.01 BLM#SULFUR CANYON#14111#10940.5791874847 12.36 Acres Construction DisturbanceRNG 1217.01 BLM#SULFUR CANYON#14111#10940.5791874847 46.30 Acres Construction DisturbanceRNG 1217.01 BLM#SULFUR CANYON#14111#10940.5791874847 2.62 Acres Operation DisturbanceRNG 1217.01 BLM#SULFUR CANYON#14111#10940.5791874847 9.71 Acres Operation DisturbanceRNG 1217.01 BLM#TWIN KNOLLS#04891#6969.49090512385 0.22 Acres Construction DisturbanceRNG 1217.01 BLM#TWIN KNOLLS#04891#6969.49090512385 0.47 Acres Construction Disturbance

Page 169: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

RNG 1217.01 BLM#TWIN KNOLLS#04891#6969.49090512385 0.10 Acres Operation DisturbanceRNG 1217.01 BLM#TWIN KNOLLS#04891#6969.49090512385 0.22 Acres Operation DisturbanceRNG 1217.01 BLM#WATER CANYON #2#04879#6697.97996861904 12.71 Acres Construction DisturbanceRNG 1217.01 BLM#WATER CANYON #2#04879#6697.97996861904 13.94 Acres Construction DisturbanceRNG 1217.01 BLM#WATER CANYON #2#04879#6697.97996861904 3.87 Acres Operation DisturbanceRNG 1217.01 BLM#WATER CANYON #2#04879#6697.97996861904 4.07 Acres Operation DisturbanceRNG 1217.01 BLM#WHITE RIVER BOTTOMS#15850#2529.48006545493 2.70 Acres Construction DisturbanceRNG 1217.01 BLM#WHITE RIVER BOTTOMS#15850#2529.48006545493 3.04 Acres Construction DisturbanceRNG 1217.01 BLM#WHITE RIVER BOTTOMS#15850#2529.48006545493 0.69 Acres Operation DisturbanceRNG 1217.01 BLM#WHITE RIVER BOTTOMS#15850#2529.48006545493 0.74 Acres Operation DisturbanceRNG 1217.01 BLM#WILDHORSE BENCH#08808#43562.358567914 89.79 Acres Construction DisturbanceRNG 1217.01 BLM#WILDHORSE BENCH#08808#43562.358567914 110.19 Acres Construction DisturbanceRNG 1217.01 BLM#WILDHORSE BENCH#08808#43562.358567914 24.83 Acres Operation DisturbanceRNG 1217.01 BLM#WILDHORSE BENCH#08808#43562.358567914 28.97 Acres Operation DisturbanceRNG 1217.02 BLM#ARGYLE RIDGE#04873#20708.8718368034 20.01 Acres Construction DisturbanceRNG 1217.02 BLM#ARGYLE RIDGE#04873#20708.8718368034 27.25 Acres Construction DisturbanceRNG 1217.02 BLM#ARGYLE RIDGE#04873#20708.8718368034 5.21 Acres Operation DisturbanceRNG 1217.02 BLM#ARGYLE RIDGE#04873#20708.8718368034 7.81 Acres Operation DisturbanceRNG 1217.02 BLM#COVE#25010#2210.38710688816 2.18 Acres Construction DisturbanceRNG 1217.02 BLM#COVE#25010#2210.38710688816 1.33 Acres Operation DisturbanceRNG 1217.02 BLM#IRIART#34057#2622.32932715253 0.72 Acres Construction DisturbanceRNG 1217.02 BLM#IRIART#34057#2622.32932715253 3.11 Acres Construction DisturbanceRNG 1217.02 BLM#IRIART#34057#2622.32932715253 0.44 Acres Operation DisturbanceRNG 1217.02 BLM#IRIART#34057#2622.32932715253 1.76 Acres Operation DisturbanceRNG 1217.02 BLM#NORTH HOLLOW#34080#847.144432669007 2.21 Acres Construction DisturbanceRNG 1217.02 BLM#NORTH HOLLOW#34080#847.144432669007 2.39 Acres Construction DisturbanceRNG 1217.02 BLM#NORTH HOLLOW#34080#847.144432669007 1.21 Acres Operation DisturbanceRNG 1217.02 BLM#NORTH HOLLOW#34080#847.144432669007 1.26 Acres Operation DisturbanceRNG 1217.02 BLM#SULFUR CANYON#14111#10940.5791874847 9.92 Acres Construction DisturbanceRNG 1217.02 BLM#SULFUR CANYON#14111#10940.5791874847 27.49 Acres Construction DisturbanceRNG 1217.02 BLM#SULFUR CANYON#14111#10940.5791874847 2.43 Acres Operation DisturbanceRNG 1217.02 BLM#SULFUR CANYON#14111#10940.5791874847 7.90 Acres Operation DisturbanceRNG 1217.051 BLM#KYUNE I#14128#14504.8287523886 4.35 Acres Construction DisturbanceRNG 1217.051 BLM#KYUNE I#14128#14504.8287523886 57.13 Acres Construction DisturbanceRNG 1217.051 BLM#KYUNE I#14128#14504.8287523886 1.24 Acres Operation DisturbanceRNG 1217.051 BLM#KYUNE I#14128#14504.8287523886 14.10 Acres Operation DisturbanceRNG 1217.051 BLM#KYUNE II#24062#10428.4504899146 2.33 Acres Construction DisturbanceRNG 1217.051 BLM#KYUNE II#24062#10428.4504899146 2.95 Acres Construction DisturbanceRNG 1217.051 BLM#KYUNE II#24062#10428.4504899146 1.05 Acres Operation DisturbanceRNG 1217.051 BLM#KYUNE II#24062#10428.4504899146 1.33 Acres Operation DisturbanceRNG 1217.051 BLM#PRICE CANYON-WEST#34094#7427.80144232912 0.70 Acres Construction DisturbanceRNG 1217.051 BLM#PRICE CANYON-WEST#34094#7427.80144232912 9.80 Acres Construction DisturbanceRNG 1217.051 BLM#PRICE CANYON-WEST#34094#7427.80144232912 0.27 Acres Operation DisturbanceRNG 1217.051 BLM#PRICE CANYON-WEST#34094#7427.80144232912 2.68 Acres Operation DisturbanceRNG 1217.051 BLM#WEST FORK#00002#16706.5129515974 7.50 Acres Construction Disturbance

Page 170: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

RNG 1217.051 BLM#WEST FORK#00002#16706.5129515974 63.92 Acres Construction DisturbanceRNG 1217.051 BLM#WEST FORK#00002#16706.5129515974 2.21 Acres Operation DisturbanceRNG 1217.051 BLM#WEST FORK#00002#16706.5129515974 16.34 Acres Operation DisturbanceRNG 1217.052 BLM#ISO TRACT - LUDLOW#04095#460.729171047479 0.41 Acres Construction DisturbanceRNG 1217.052 BLM#ISO TRACT - LUDLOW#04095#460.729171047479 0.41 Acres Construction DisturbanceRNG 1217.052 BLM#ISO TRACT - LUDLOW#04095#460.729171047479 0.28 Acres Operation DisturbanceRNG 1217.052 BLM#ISO TRACT - LUDLOW#04095#460.729171047479 0.28 Acres Operation DisturbanceRNG 1217.052 USFS#DIAMOND FORK#00813#90743.2467064413 27.93 Acres Construction DisturbanceRNG 1217.052 USFS#DIAMOND FORK#00813#90743.2467064413 29.93 Acres Construction DisturbanceRNG 1217.052 USFS#DIAMOND FORK#00813#90743.2467064413 7.81 Acres Operation DisturbanceRNG 1217.052 USFS#DIAMOND FORK#00813#90743.2467064413 8.44 Acres Operation DisturbanceRNG 1217.052 USFS#INGRAM-SOLDIER#00805#3837.09488080564 2.42 Acres Construction DisturbanceRNG 1217.052 USFS#INGRAM-SOLDIER#00805#3837.09488080564 2.42 Acres Construction DisturbanceRNG 1217.052 USFS#INGRAM-SOLDIER#00805#3837.09488080564 1.68 Acres Operation DisturbanceRNG 1217.052 USFS#JACOB/BALDY#00806#11627.6789294459 20.40 Acres Construction DisturbanceRNG 1217.052 USFS#JACOB/BALDY#00806#11627.6789294459 29.32 Acres Construction DisturbanceRNG 1217.052 USFS#JACOB/BALDY#00806#11627.6789294459 8.19 Acres Operation DisturbanceRNG 1217.052 USFS#JACOB/BALDY#00806#11627.6789294459 10.78 Acres Operation DisturbanceRNG 1217.052 USFS#WATERSHED CLOSURE# #14220.1689058731 46.98 Acres Construction DisturbanceRNG 1217.052 USFS#WATERSHED CLOSURE# #14220.1689058731 56.56 Acres Construction DisturbanceRNG 1217.052 USFS#WATERSHED CLOSURE# #14220.1689058731 14.92 Acres Operation DisturbanceRNG 1217.052 USFS#WATERSHED CLOSURE# #14220.1689058731 17.79 Acres Operation DisturbanceRNG 1217.1 BLM#CONSUMERS WASH#34028#10722.856058525 28.61 Acres Construction DisturbanceRNG 1217.1 BLM#CONSUMERS WASH#34028#10722.856058525 68.69 Acres Construction DisturbanceRNG 1217.1 BLM#CONSUMERS WASH#34028#10722.856058525 9.29 Acres Operation DisturbanceRNG 1217.1 BLM#CONSUMERS WASH#34028#10722.856058525 20.31 Acres Operation DisturbanceRNG 1217.1 BLM#GORDON CRK WITHDRAWL#14130#21831.6729311758 4.78 Acres Construction DisturbanceRNG 1217.1 BLM#GORDON CRK WITHDRAWL#14130#21831.6729311758 62.64 Acres Construction DisturbanceRNG 1217.1 BLM#GORDON CRK WITHDRAWL#14130#21831.6729311758 2.85 Acres Operation DisturbanceRNG 1217.1 BLM#GORDON CRK WITHDRAWL#14130#21831.6729311758 20.09 Acres Operation DisturbanceRNG 1217.1 BLM#KYUNE II#24062#10428.4504899146 5.70 Acres Construction DisturbanceRNG 1217.1 BLM#KYUNE II#24062#10428.4504899146 15.42 Acres Construction DisturbanceRNG 1217.1 BLM#KYUNE II#24062#10428.4504899146 3.40 Acres Operation DisturbanceRNG 1217.1 BLM#KYUNE II#24062#10428.4504899146 9.13 Acres Operation DisturbanceRNG 1217.1 BLM#TRAIL CANYON#14112#5860.33226928451 0.02 Acres Construction DisturbanceRNG 1217.1 BLM#TRAIL CANYON#14112#5860.33226928451 0.01 Acres Operation DisturbanceRNG 1217.1 BLM#WEST FORK#00002#16706.5129515974 0.02 Acres Construction DisturbanceRNG 1217.1 BLM#WEST FORK#00002#16706.5129515974 0.01 Acres Operation DisturbanceRNG 1217.1 BLM#WILLOW CREEK#14122#15024.6475157153 19.55 Acres Construction DisturbanceRNG 1217.1 BLM#WILLOW CREEK#14122#15024.6475157153 119.90 Acres Construction DisturbanceRNG 1217.1 BLM#WILLOW CREEK#14122#15024.6475157153 4.71 Acres Operation DisturbanceRNG 1217.1 BLM#WILLOW CREEK#14122#15024.6475157153 24.17 Acres Operation DisturbanceRNG 1217.15 BLM#GORDON CRK WITHDRAWL#14130#21831.6729311758 0.05 Acres Construction DisturbanceRNG 1217.15 BLM#GORDON CRK WITHDRAWL#14130#21831.6729311758 12.51 Acres Construction DisturbanceRNG 1217.15 BLM#GORDON CRK WITHDRAWL#14130#21831.6729311758 0.02 Acres Operation Disturbance

Page 171: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

RNG 1217.15 BLM#GORDON CRK WITHDRAWL#14130#21831.6729311758 5.48 Acres Operation DisturbanceRNG 1217.15 BLM#TRAIL CANYON#14112#5860.33226928451 34.82 Acres Construction DisturbanceRNG 1217.15 BLM#TRAIL CANYON#14112#5860.33226928451 65.52 Acres Construction DisturbanceRNG 1217.15 BLM#TRAIL CANYON#14112#5860.33226928451 10.59 Acres Operation DisturbanceRNG 1217.15 BLM#TRAIL CANYON#14112#5860.33226928451 20.51 Acres Operation DisturbanceRNG 1217.15 BLM#UINTA#01729#1027.59388800285 1.76 Acres Construction DisturbanceRNG 1217.15 BLM#UINTA#01729#1027.59388800285 2.12 Acres Construction DisturbanceRNG 1217.15 BLM#UINTA#01729#1027.59388800285 1.12 Acres Operation DisturbanceRNG 1217.15 BLM#UINTA#01729#1027.59388800285 1.35 Acres Operation DisturbanceRNG 1217.15 USFS#BEAVER DAMS/BOULGER#00109#8809.89119194874 31.47 Acres Construction DisturbanceRNG 1217.15 USFS#BEAVER DAMS/BOULGER#00109#8809.89119194874 59.97 Acres Construction DisturbanceRNG 1217.15 USFS#BEAVER DAMS/BOULGER#00109#8809.89119194874 8.23 Acres Operation DisturbanceRNG 1217.15 USFS#BEAVER DAMS/BOULGER#00109#8809.89119194874 17.41 Acres Operation DisturbanceRNG 1217.15 USFS#BIRCH CREEK/BEAR CAN#00110#17264.5325620524 9.58 Acres Construction DisturbanceRNG 1217.15 USFS#BIRCH CREEK/BEAR CAN#00110#17264.5325620524 9.65 Acres Construction DisturbanceRNG 1217.15 USFS#BIRCH CREEK/BEAR CAN#00110#17264.5325620524 2.55 Acres Operation DisturbanceRNG 1217.15 USFS#BIRCH CREEK/BEAR CAN#00110#17264.5325620524 2.57 Acres Operation DisturbanceRNG 1217.15 USFS#BOB WRIGHT#00308#5311.67653450182 0.00 Acres Construction DisturbanceRNG 1217.15 USFS#BOB WRIGHT#00308#5311.67653450182 0.00 Acres Operation DisturbanceRNG 1217.15 USFS#BURNOUT#00312#4253.72856878661 55.36 Acres Construction DisturbanceRNG 1217.15 USFS#BURNOUT#00312#4253.72856878661 55.40 Acres Construction DisturbanceRNG 1217.15 USFS#BURNOUT#00312#4253.72856878661 18.02 Acres Operation DisturbanceRNG 1217.15 USFS#BURNOUT#00312#4253.72856878661 18.03 Acres Operation DisturbanceRNG 1217.15 USFS#ECCLES#00324#4389.70562201137 0.28 Acres Construction DisturbanceRNG 1217.15 USFS#ECCLES#00324#4389.70562201137 0.28 Acres Construction DisturbanceRNG 1217.15 USFS#ECCLES#00324#4389.70562201137 0.18 Acres Operation DisturbanceRNG 1217.15 USFS#ECCLES#00324#4389.70562201137 0.18 Acres Operation DisturbanceRNG 1217.15 USFS#FAIRVIEW C & H#00102#9208.22314401301 2.13 Acres Construction DisturbanceRNG 1217.15 USFS#FAIRVIEW C & H#00102#9208.22314401301 3.43 Acres Construction DisturbanceRNG 1217.15 USFS#FAIRVIEW C & H#00102#9208.22314401301 1.33 Acres Operation DisturbanceRNG 1217.15 USFS#FAIRVIEW C & H#00102#9208.22314401301 2.16 Acres Operation DisturbanceRNG 1217.15 USFS#GOOSEBERRY-COTTONWOO#00114#4668.19243940412 24.93 Acres Construction DisturbanceRNG 1217.15 USFS#GOOSEBERRY-COTTONWOO#00114#4668.19243940412 26.78 Acres Construction DisturbanceRNG 1217.15 USFS#GOOSEBERRY-COTTONWOO#00114#4668.19243940412 9.55 Acres Operation DisturbanceRNG 1217.15 USFS#GOOSEBERRY-COTTONWOO#00114#4668.19243940412 10.73 Acres Operation DisturbanceRNG 1217.15 USFS#MONUMENT PEAK#00334#6593.88450132254 0.02 Acres Construction DisturbanceRNG 1217.15 USFS#MONUMENT PEAK#00334#6593.88450132254 0.02 Acres Construction DisturbanceRNG 1217.15 USFS#MONUMENT PEAK#00334#6593.88450132254 0.01 Acres Operation DisturbanceRNG 1217.15 USFS#MONUMENT PEAK#00334#6593.88450132254 0.01 Acres Operation DisturbanceRNG 1217.15 USFS#PRIVATE LAND#00303#3937.27865292296 0.01 Acres Construction DisturbanceRNG 1217.15 USFS#PRIVATE LAND#00303#3937.27865292296 1.15 Acres Construction DisturbanceRNG 1217.15 USFS#PRIVATE LAND#00303#3937.27865292296 0.00 Acres Operation DisturbanceRNG 1217.15 USFS#PRIVATE LAND#00303#3937.27865292296 0.73 Acres Operation DisturbanceRNG 1217.15 USFS#SOUTH SAN PITCH#00124#5482.63863455651 0.00 Acres Construction DisturbanceRNG 1217.15 USFS#SOUTH SAN PITCH#00124#5482.63863455651 0.22 Acres Construction Disturbance

Page 172: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

RNG 1217.15 USFS#SOUTH SAN PITCH#00124#5482.63863455651 0.00 Acres Operation DisturbanceRNG 1217.15 USFS#SOUTH SAN PITCH#00124#5482.63863455651 0.14 Acres Operation DisturbanceRNG 1217.15 USFS#SWENS CANYON#00344#4637.58844824165 35.80 Acres Construction DisturbanceRNG 1217.15 USFS#SWENS CANYON#00344#4637.58844824165 70.47 Acres Construction DisturbanceRNG 1217.15 USFS#SWENS CANYON#00344#4637.58844824165 10.80 Acres Operation DisturbanceRNG 1217.15 USFS#SWENS CANYON#00344#4637.58844824165 22.07 Acres Operation DisturbanceRNG 1218 BLM#ARGYLE RIDGE#04873#20708.8718368034 44.15 Acres Construction DisturbanceRNG 1218 BLM#ARGYLE RIDGE#04873#20708.8718368034 125.99 Acres Construction DisturbanceRNG 1218 BLM#ARGYLE RIDGE#04873#20708.8718368034 17.72 Acres Operation DisturbanceRNG 1218 BLM#ARGYLE RIDGE#04873#20708.8718368034 49.75 Acres Operation DisturbanceRNG 1218 BLM#SULFUR CANYON#14111#10940.5791874847 2.59 Acres Construction DisturbanceRNG 1218 BLM#SULFUR CANYON#14111#10940.5791874847 6.43 Acres Construction DisturbanceRNG 1218 BLM#SULFUR CANYON#14111#10940.5791874847 0.69 Acres Operation DisturbanceRNG 1218 BLM#SULFUR CANYON#14111#10940.5791874847 2.73 Acres Operation DisturbanceRNG 1218 BLM#WATER CANYON #1#04876#5121.07149073753 12.26 Acres Construction DisturbanceRNG 1218 BLM#WATER CANYON #1#04876#5121.07149073753 31.93 Acres Construction DisturbanceRNG 1218 BLM#WATER CANYON #1#04876#5121.07149073753 4.97 Acres Operation DisturbanceRNG 1218 BLM#WATER CANYON #1#04876#5121.07149073753 12.54 Acres Operation DisturbanceRNG 1219.2 BLM#KYUNE I#14128#14504.8287523886 62.49 Acres Construction DisturbanceRNG 1219.2 BLM#KYUNE I#14128#14504.8287523886 111.51 Acres Construction DisturbanceRNG 1219.2 BLM#KYUNE I#14128#14504.8287523886 21.65 Acres Operation DisturbanceRNG 1219.2 BLM#KYUNE I#14128#14504.8287523886 38.44 Acres Operation DisturbanceRNG 1219.2 BLM#WEST FORK#00002#16706.5129515974 14.31 Acres Construction DisturbanceRNG 1219.2 BLM#WEST FORK#00002#16706.5129515974 145.15 Acres Construction DisturbanceRNG 1219.2 BLM#WEST FORK#00002#16706.5129515974 4.12 Acres Operation DisturbanceRNG 1219.2 BLM#WEST FORK#00002#16706.5129515974 52.25 Acres Operation DisturbanceRNG 1219.2 USFS#TABBYUNE#00809#8733.19245100882 29.78 Acres Construction DisturbanceRNG 1219.2 USFS#TABBYUNE#00809#8733.19245100882 33.90 Acres Construction DisturbanceRNG 1219.2 USFS#TABBYUNE#00809#8733.19245100882 8.45 Acres Operation DisturbanceRNG 1219.2 USFS#TABBYUNE#00809#8733.19245100882 9.62 Acres Operation DisturbanceRNG 1219.45 BLM#WEST FORK#00002#16706.5129515974 2.66 Acres Construction DisturbanceRNG 1219.45 BLM#WEST FORK#00002#16706.5129515974 0.86 Acres Operation DisturbanceRNG 1219.5 BLM#CHERRY CREEK#04021#495.101753106265 5.36 Acres Construction DisturbanceRNG 1219.5 BLM#CHERRY CREEK#04021#495.101753106265 5.72 Acres Construction DisturbanceRNG 1219.5 BLM#CHERRY CREEK#04021#495.101753106265 2.58 Acres Operation DisturbanceRNG 1219.5 BLM#CHERRY CREEK#04021#495.101753106265 2.84 Acres Operation DisturbanceRNG 1219.5 BLM#KYUNE I#14128#14504.8287523886 53.59 Acres Construction DisturbanceRNG 1219.5 BLM#KYUNE I#14128#14504.8287523886 138.14 Acres Construction DisturbanceRNG 1219.5 BLM#KYUNE I#14128#14504.8287523886 17.10 Acres Operation DisturbanceRNG 1219.5 BLM#KYUNE I#14128#14504.8287523886 48.48 Acres Operation DisturbanceRNG 1219.5 BLM#WEST FORK#00002#16706.5129515974 6.71 Acres Construction DisturbanceRNG 1219.5 BLM#WEST FORK#00002#16706.5129515974 102.14 Acres Construction DisturbanceRNG 1219.5 BLM#WEST FORK#00002#16706.5129515974 3.30 Acres Operation DisturbanceRNG 1219.5 BLM#WEST FORK#00002#16706.5129515974 34.49 Acres Operation DisturbanceRNG 1219.5 USFS#TABBYUNE#00809#8733.19245100882 0.01 Acres Construction Disturbance

Page 173: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

RNG 1219.5 USFS#TABBYUNE#00809#8733.19245100882 0.02 Acres Construction DisturbanceRNG 1219.5 USFS#TABBYUNE#00809#8733.19245100882 0.01 Acres Operation DisturbanceRNG 1219.5 USFS#TABBYUNE#00809#8733.19245100882 0.01 Acres Operation DisturbanceRNG 1219.6 BLM#WEST FORK#00002#16706.5129515974 16.26 Acres Construction DisturbanceRNG 1219.6 BLM#WEST FORK#00002#16706.5129515974 4.97 Acres Operation DisturbanceRNG 1220 BLM#AGATE#05853#20773.5067574773 8.86 Acres Construction DisturbanceRNG 1220 BLM#AGATE#05853#20773.5067574773 8.50 Acres Construction DisturbanceRNG 1220 BLM#AGATE#05853#20773.5067574773 3.63 Acres Operation DisturbanceRNG 1220 BLM#AGATE#05853#20773.5067574773 3.35 Acres Operation DisturbanceRNG 1220 BLM#ATCHEE RIDGE AMP#08824#101934.31769717 40.22 Acres Construction DisturbanceRNG 1220 BLM#ATCHEE RIDGE AMP#08824#101934.31769717 31.83 Acres Construction DisturbanceRNG 1220 BLM#ATCHEE RIDGE AMP#08824#101934.31769717 9.72 Acres Operation DisturbanceRNG 1220 BLM#ATCHEE RIDGE AMP#08824#101934.31769717 7.82 Acres Operation DisturbanceRNG 1220 BLM#ATHENA#05809#46488.6754498567 125.10 Acres Construction DisturbanceRNG 1220 BLM#ATHENA#05809#46488.6754498567 125.55 Acres Construction DisturbanceRNG 1220 BLM#ATHENA#05809#46488.6754498567 27.93 Acres Operation DisturbanceRNG 1220 BLM#ATHENA#05809#46488.6754498567 27.88 Acres Operation DisturbanceRNG 1220 BLM#BADGER WASH#06601#7990.92812442498 0.81 Acres Construction DisturbanceRNG 1220 BLM#BADGER WASH#06601#7990.92812442498 0.62 Acres Construction DisturbanceRNG 1220 BLM#BADGER WASH#06601#7990.92812442498 0.33 Acres Operation DisturbanceRNG 1220 BLM#BADGER WASH#06601#7990.92812442498 0.24 Acres Operation DisturbanceRNG 1220 BLM#BAR-X#05808#21244.3669397507 12.74 Acres Construction DisturbanceRNG 1220 BLM#BAR-X#05808#21244.3669397507 9.60 Acres Construction DisturbanceRNG 1220 BLM#BAR-X#05808#21244.3669397507 3.79 Acres Operation DisturbanceRNG 1220 BLM#BAR-X#05808#21244.3669397507 2.78 Acres Operation DisturbanceRNG 1220 BLM#BUCKMASTER#34013#55934.1689741054 58.32 Acres Construction DisturbanceRNG 1220 BLM#BUCKMASTER#34013#55934.1689741054 52.42 Acres Construction DisturbanceRNG 1220 BLM#BUCKMASTER#34013#55934.1689741054 16.64 Acres Operation DisturbanceRNG 1220 BLM#BUCKMASTER#34013#55934.1689741054 14.96 Acres Operation DisturbanceRNG 1220 BLM#Cathedral Bluffs#06349#106473.989228823 30.84 Acres Construction DisturbanceRNG 1220 BLM#Cathedral Bluffs#06349#106473.989228823 23.52 Acres Construction DisturbanceRNG 1220 BLM#Cathedral Bluffs#06349#106473.989228823 6.30 Acres Operation DisturbanceRNG 1220 BLM#Cathedral Bluffs#06349#106473.989228823 4.84 Acres Operation DisturbanceRNG 1220 BLM#CISCO MESA#05810#57704.0759351303 64.85 Acres Construction DisturbanceRNG 1220 BLM#CISCO MESA#05810#57704.0759351303 55.29 Acres Construction DisturbanceRNG 1220 BLM#CISCO MESA#05810#57704.0759351303 17.21 Acres Operation DisturbanceRNG 1220 BLM#CISCO MESA#05810#57704.0759351303 15.08 Acres Operation DisturbanceRNG 1220 BLM#CISCO#05885#154006.06702155 180.24 Acres Construction DisturbanceRNG 1220 BLM#CISCO#05885#154006.06702155 145.88 Acres Construction DisturbanceRNG 1220 BLM#CISCO#05885#154006.06702155 53.33 Acres Operation DisturbanceRNG 1220 BLM#CISCO#05885#154006.06702155 42.83 Acres Operation DisturbanceRNG 1220 BLM#CLOSED TO GRAZING#14129#14566.2164133852 62.46 Acres Construction DisturbanceRNG 1220 BLM#CLOSED TO GRAZING#14129#14566.2164133852 51.87 Acres Construction DisturbanceRNG 1220 BLM#CLOSED TO GRAZING#14129#14566.2164133852 18.64 Acres Operation DisturbanceRNG 1220 BLM#CLOSED TO GRAZING#14129#14566.2164133852 15.58 Acres Operation Disturbance

Page 174: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

RNG 1220 BLM#CRESCENT CANYON#05856#28077.4064445561 43.65 Acres Construction DisturbanceRNG 1220 BLM#CRESCENT CANYON#05856#28077.4064445561 33.79 Acres Construction DisturbanceRNG 1220 BLM#CRESCENT CANYON#05856#28077.4064445561 12.32 Acres Operation DisturbanceRNG 1220 BLM#CRESCENT CANYON#05856#28077.4064445561 9.39 Acres Operation DisturbanceRNG 1220 BLM#DESERT#34034#60901.8162194491 16.04 Acres Construction DisturbanceRNG 1220 BLM#DESERT#34034#60901.8162194491 12.35 Acres Construction DisturbanceRNG 1220 BLM#DESERT#34034#60901.8162194491 6.57 Acres Operation DisturbanceRNG 1220 BLM#DESERT#34034#60901.8162194491 4.86 Acres Operation DisturbanceRNG 1220 BLM#Douglas Cr#06342#5405.32338148692 136.36 Acres Construction DisturbanceRNG 1220 BLM#Douglas Cr#06342#5405.32338148692 105.87 Acres Construction DisturbanceRNG 1220 BLM#Douglas Cr#06342#5405.32338148692 26.80 Acres Operation DisturbanceRNG 1220 BLM#Douglas Cr#06342#5405.32338148692 20.76 Acres Operation DisturbanceRNG 1220 BLM#Evacuation Cr#06357#114868.940125417 385.66 Acres Construction DisturbanceRNG 1220 BLM#Evacuation Cr#06357#114868.940125417 350.43 Acres Construction DisturbanceRNG 1220 BLM#Evacuation Cr#06357#114868.940125417 85.27 Acres Operation DisturbanceRNG 1220 BLM#Evacuation Cr#06357#114868.940125417 76.86 Acres Operation DisturbanceRNG 1220 BLM#FLOY CREEK#05801#24775.8754233692 22.07 Acres Construction DisturbanceRNG 1220 BLM#FLOY CREEK#05801#24775.8754233692 23.13 Acres Construction DisturbanceRNG 1220 BLM#FLOY CREEK#05801#24775.8754233692 6.66 Acres Operation DisturbanceRNG 1220 BLM#FLOY CREEK#05801#24775.8754233692 6.73 Acres Operation DisturbanceRNG 1220 BLM#Hall Draw#06335#6939.67910582959 60.30 Acres Construction DisturbanceRNG 1220 BLM#Hall Draw#06335#6939.67910582959 45.23 Acres Construction DisturbanceRNG 1220 BLM#Hall Draw#06335#6939.67910582959 12.51 Acres Operation DisturbanceRNG 1220 BLM#Hall Draw#06335#6939.67910582959 9.30 Acres Operation DisturbanceRNG 1220 BLM#Hatch Flat#06336#1492.60212292353 8.38 Acres Construction DisturbanceRNG 1220 BLM#Hatch Flat#06336#1492.60212292353 6.31 Acres Construction DisturbanceRNG 1220 BLM#Hatch Flat#06336#1492.60212292353 2.59 Acres Operation DisturbanceRNG 1220 BLM#Hatch Flat#06336#1492.60212292353 1.90 Acres Operation DisturbanceRNG 1220 BLM#HORSE CANYON#05877#43290.2924602546 41.35 Acres Construction DisturbanceRNG 1220 BLM#HORSE CANYON#05877#43290.2924602546 38.34 Acres Construction DisturbanceRNG 1220 BLM#HORSE CANYON#05877#43290.2924602546 11.93 Acres Operation DisturbanceRNG 1220 BLM#HORSE CANYON#05877#43290.2924602546 11.07 Acres Operation DisturbanceRNG 1220 BLM#Johnson/Trujillo#06338#19376.3688095675 27.91 Acres Construction DisturbanceRNG 1220 BLM#Johnson/Trujillo#06338#19376.3688095675 21.18 Acres Construction DisturbanceRNG 1220 BLM#Johnson/Trujillo#06338#19376.3688095675 9.96 Acres Operation DisturbanceRNG 1220 BLM#Johnson/Trujillo#06338#19376.3688095675 7.32 Acres Operation DisturbanceRNG 1220 BLM#JOUFLAS#16612#8469.50058522504 1.90 Acres Construction DisturbanceRNG 1220 BLM#JOUFLAS#16612#8469.50058522504 1.44 Acres Construction DisturbanceRNG 1220 BLM#JOUFLAS#16612#8469.50058522504 0.78 Acres Operation DisturbanceRNG 1220 BLM#JOUFLAS#16612#8469.50058522504 0.57 Acres Operation DisturbanceRNG 1220 BLM#LITTLE GRAND#05866#106781.033665594 8.24 Acres Construction DisturbanceRNG 1220 BLM#LITTLE GRAND#05866#106781.033665594 10.68 Acres Construction DisturbanceRNG 1220 BLM#LITTLE GRAND#05866#106781.033665594 3.38 Acres Operation DisturbanceRNG 1220 BLM#LITTLE GRAND#05866#106781.033665594 4.20 Acres Operation DisturbanceRNG 1220 BLM#LITTLE HOLE#05883#37030.2265182403 7.14 Acres Construction Disturbance

Page 175: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

RNG 1220 BLM#LITTLE HOLE#05883#37030.2265182403 7.21 Acres Construction DisturbanceRNG 1220 BLM#LITTLE HOLE#05883#37030.2265182403 2.92 Acres Operation DisturbanceRNG 1220 BLM#LITTLE HOLE#05883#37030.2265182403 2.84 Acres Operation DisturbanceRNG 1220 BLM#LITTLE VALLEY#35040#18091.4502481869 51.55 Acres Construction DisturbanceRNG 1220 BLM#LITTLE VALLEY#35040#18091.4502481869 89.17 Acres Construction DisturbanceRNG 1220 BLM#LITTLE VALLEY#35040#18091.4502481869 13.04 Acres Operation DisturbanceRNG 1220 BLM#LITTLE VALLEY#35040#18091.4502481869 21.04 Acres Operation DisturbanceRNG 1220 BLM#Lower Fletcher Draw#06041#9868.1624985558 66.10 Acres Construction DisturbanceRNG 1220 BLM#Lower Fletcher Draw#06041#9868.1624985558 51.12 Acres Construction DisturbanceRNG 1220 BLM#Lower Fletcher Draw#06041#9868.1624985558 13.52 Acres Operation DisturbanceRNG 1220 BLM#Lower Fletcher Draw#06041#9868.1624985558 10.44 Acres Operation DisturbanceRNG 1220 BLM#Massadona#06324#10870.9226002101 47.07 Acres Construction DisturbanceRNG 1220 BLM#Massadona#06324#10870.9226002101 53.40 Acres Construction DisturbanceRNG 1220 BLM#Massadona#06324#10870.9226002101 9.80 Acres Operation DisturbanceRNG 1220 BLM#Massadona#06324#10870.9226002101 10.63 Acres Operation DisturbanceRNG 1220 BLM#MONUMENT WASH#05811#79289.2231940512 3.33 Acres Construction DisturbanceRNG 1220 BLM#MONUMENT WASH#05811#79289.2231940512 2.76 Acres Construction DisturbanceRNG 1220 BLM#MONUMENT WASH#05811#79289.2231940512 1.36 Acres Operation DisturbanceRNG 1220 BLM#MONUMENT WASH#05811#79289.2231940512 1.09 Acres Operation DisturbanceRNG 1220 BLM#PIPELINE#05822#15870.4095512663 34.33 Acres Construction DisturbanceRNG 1220 BLM#PIPELINE#05822#15870.4095512663 32.69 Acres Construction DisturbanceRNG 1220 BLM#PIPELINE#05822#15870.4095512663 10.29 Acres Operation DisturbanceRNG 1220 BLM#PIPELINE#05822#15870.4095512663 9.80 Acres Operation DisturbanceRNG 1220 BLM#Raven Park#06314#19853.6857567015 5.31 Acres Construction DisturbanceRNG 1220 BLM#Raven Park#06314#19853.6857567015 4.51 Acres Construction DisturbanceRNG 1220 BLM#Raven Park#06314#19853.6857567015 2.00 Acres Operation DisturbanceRNG 1220 BLM#Raven Park#06314#19853.6857567015 1.56 Acres Operation DisturbanceRNG 1220 BLM#Red Wash#06320#8218.88569045286 99.46 Acres Construction DisturbanceRNG 1220 BLM#Red Wash#06320#8218.88569045286 74.57 Acres Construction DisturbanceRNG 1220 BLM#Red Wash#06320#8218.88569045286 19.68 Acres Operation DisturbanceRNG 1220 BLM#Red Wash#06320#8218.88569045286 14.66 Acres Operation DisturbanceRNG 1220 BLM#SAN ARROYO#05845#139053.952244329 124.43 Acres Construction DisturbanceRNG 1220 BLM#SAN ARROYO#05845#139053.952244329 104.48 Acres Construction DisturbanceRNG 1220 BLM#SAN ARROYO#05845#139053.952244329 36.05 Acres Operation DisturbanceRNG 1220 BLM#SAN ARROYO#05845#139053.952244329 29.78 Acres Operation DisturbanceRNG 1220 BLM#Spooky Mtn#06316#29666.2451367339 31.77 Acres Construction DisturbanceRNG 1220 BLM#Spooky Mtn#06316#29666.2451367339 23.82 Acres Construction DisturbanceRNG 1220 BLM#Spooky Mtn#06316#29666.2451367339 6.19 Acres Operation DisturbanceRNG 1220 BLM#Spooky Mtn#06316#29666.2451367339 4.61 Acres Operation DisturbanceRNG 1220 BLM#Spring Cr#06032#40228.7324498046 138.52 Acres Construction DisturbanceRNG 1220 BLM#Spring Cr#06032#40228.7324498046 113.61 Acres Construction DisturbanceRNG 1220 BLM#Spring Cr#06032#40228.7324498046 27.23 Acres Operation DisturbanceRNG 1220 BLM#Spring Cr#06032#40228.7324498046 22.17 Acres Operation DisturbanceRNG 1220 BLM#TRAIL SPRINGS#14113#27383.7239866892 31.05 Acres Construction DisturbanceRNG 1220 BLM#TRAIL SPRINGS#14113#27383.7239866892 24.61 Acres Construction Disturbance

Page 176: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

RNG 1220 BLM#TRAIL SPRINGS#14113#27383.7239866892 7.55 Acres Operation DisturbanceRNG 1220 BLM#TRAIL SPRINGS#14113#27383.7239866892 6.08 Acres Operation DisturbanceRNG 1220 BLM#Twin Buttes#06346#158343.836703259 250.80 Acres Construction DisturbanceRNG 1220 BLM#Twin Buttes#06346#158343.836703259 220.83 Acres Construction DisturbanceRNG 1220 BLM#Twin Buttes#06346#158343.836703259 56.57 Acres Operation DisturbanceRNG 1220 BLM#Twin Buttes#06346#158343.836703259 49.25 Acres Operation DisturbanceRNG 1220 BLM#Unalloted#99999#67604.7607835773 9.58 Acres Construction DisturbanceRNG 1220 BLM#Unalloted#99999#67604.7607835773 33.52 Acres Construction DisturbanceRNG 1220 BLM#Unalloted#99999#67604.7607835773 1.84 Acres Operation DisturbanceRNG 1220 BLM#Unalloted#99999#67604.7607835773 7.41 Acres Operation DisturbanceRNG 1220 BLM#W SALT COM#16603#94841.5996149866 356.09 Acres Construction DisturbanceRNG 1220 BLM#W SALT COM#16603#94841.5996149866 418.81 Acres Construction DisturbanceRNG 1220 BLM#W SALT COM#16603#94841.5996149866 81.71 Acres Operation DisturbanceRNG 1220 BLM#W SALT COM#16603#94841.5996149866 89.01 Acres Operation DisturbanceRNG 1222.05 BLM#BIG SPRINGS#24009#1157.5397645346 0.05 Acres Construction DisturbanceRNG 1222.05 BLM#BIG SPRINGS#24009#1157.5397645346 0.05 Acres Construction DisturbanceRNG 1222.05 BLM#BIG SPRINGS#24009#1157.5397645346 0.02 Acres Operation DisturbanceRNG 1222.05 BLM#BIG SPRINGS#24009#1157.5397645346 0.02 Acres Operation DisturbanceRNG 1222.05 BLM#COON SPRING#34029#11319.2271700413 71.97 Acres Construction DisturbanceRNG 1222.05 BLM#COON SPRING#34029#11319.2271700413 85.88 Acres Construction DisturbanceRNG 1222.05 BLM#COON SPRING#34029#11319.2271700413 12.66 Acres Operation DisturbanceRNG 1222.05 BLM#COON SPRING#34029#11319.2271700413 14.96 Acres Operation DisturbanceRNG 1222.05 BLM#DESERT#34034#60901.8162194491 7.15 Acres Construction DisturbanceRNG 1222.05 BLM#DESERT#34034#60901.8162194491 9.39 Acres Construction DisturbanceRNG 1222.05 BLM#DESERT#34034#60901.8162194491 2.15 Acres Operation DisturbanceRNG 1222.05 BLM#DESERT#34034#60901.8162194491 2.82 Acres Operation DisturbanceRNG 1222.05 BLM#ELMO#34041#2378.14800941767 0.79 Acres Construction DisturbanceRNG 1222.05 BLM#ELMO#34041#2378.14800941767 1.30 Acres Construction DisturbanceRNG 1222.05 BLM#ELMO#34041#2378.14800941767 0.24 Acres Operation DisturbanceRNG 1222.05 BLM#ELMO#34041#2378.14800941767 0.38 Acres Operation DisturbanceRNG 1222.05 BLM#ICELANDER#24056#49563.8770170713 49.38 Acres Construction DisturbanceRNG 1222.05 BLM#ICELANDER#24056#49563.8770170713 61.00 Acres Construction DisturbanceRNG 1222.05 BLM#ICELANDER#24056#49563.8770170713 9.77 Acres Operation DisturbanceRNG 1222.05 BLM#ICELANDER#24056#49563.8770170713 11.60 Acres Operation DisturbanceRNG 1222.05 BLM#MARSING#24071#805.263343184597 0.76 Acres Construction DisturbanceRNG 1222.05 BLM#MARSING#24071#805.263343184597 1.07 Acres Construction DisturbanceRNG 1222.05 BLM#MARSING#24071#805.263343184597 0.23 Acres Operation DisturbanceRNG 1222.05 BLM#MARSING#24071#805.263343184597 0.32 Acres Operation DisturbanceRNG 1222.05 BLM#MATHIS WASH#14133#5229.70673260752 39.59 Acres Construction DisturbanceRNG 1222.05 BLM#MATHIS WASH#14133#5229.70673260752 74.63 Acres Construction DisturbanceRNG 1222.05 BLM#MATHIS WASH#14133#5229.70673260752 5.99 Acres Operation DisturbanceRNG 1222.05 BLM#MATHIS WASH#14133#5229.70673260752 11.08 Acres Operation DisturbanceRNG 1222.05 BLM#MOUNDS#24076#23076.7966634558 71.50 Acres Construction DisturbanceRNG 1222.05 BLM#MOUNDS#24076#23076.7966634558 86.21 Acres Construction DisturbanceRNG 1222.05 BLM#MOUNDS#24076#23076.7966634558 13.01 Acres Operation Disturbance

Page 177: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

RNG 1222.05 BLM#MOUNDS#24076#23076.7966634558 15.23 Acres Operation DisturbanceRNG 1222.05 BLM#MUD SPRINGS#34077#31495.2616981008 27.87 Acres Construction DisturbanceRNG 1222.05 BLM#MUD SPRINGS#34077#31495.2616981008 34.19 Acres Construction DisturbanceRNG 1222.05 BLM#MUD SPRINGS#34077#31495.2616981008 5.08 Acres Operation DisturbanceRNG 1222.05 BLM#MUD SPRINGS#34077#31495.2616981008 6.18 Acres Operation DisturbanceRNG 1222.05 BLM#NORTH OLSEN LAKE#34081#4073.82717799071 0.63 Acres Construction DisturbanceRNG 1222.05 BLM#NORTH OLSEN LAKE#34081#4073.82717799071 0.64 Acres Construction DisturbanceRNG 1222.05 BLM#NORTH OLSEN LAKE#34081#4073.82717799071 0.19 Acres Operation DisturbanceRNG 1222.05 BLM#NORTH OLSEN LAKE#34081#4073.82717799071 0.19 Acres Operation DisturbanceRNG 1222.05 BLM#OVIATT#24084#452.975355177489 17.89 Acres Construction DisturbanceRNG 1222.05 BLM#OVIATT#24084#452.975355177489 18.53 Acres Construction DisturbanceRNG 1222.05 BLM#OVIATT#24084#452.975355177489 2.44 Acres Operation DisturbanceRNG 1222.05 BLM#OVIATT#24084#452.975355177489 2.52 Acres Operation DisturbanceRNG 1222.05 BLM#SOUTH OLSEN LAKE#14106#1896.6492738024 8.06 Acres Construction DisturbanceRNG 1222.05 BLM#SOUTH OLSEN LAKE#14106#1896.6492738024 12.53 Acres Construction DisturbanceRNG 1222.05 BLM#SOUTH OLSEN LAKE#14106#1896.6492738024 1.54 Acres Operation DisturbanceRNG 1222.05 BLM#SOUTH OLSEN LAKE#14106#1896.6492738024 2.20 Acres Operation DisturbanceRNG 1222.05 BLM#STAKER#14108#679.397037437032 8.71 Acres Construction DisturbanceRNG 1222.05 BLM#STAKER#14108#679.397037437032 8.83 Acres Construction DisturbanceRNG 1222.05 BLM#STAKER#14108#679.397037437032 1.39 Acres Operation DisturbanceRNG 1222.05 BLM#STAKER#14108#679.397037437032 1.42 Acres Operation DisturbanceRNG 1222.05 BLM#SUMMERVILLE#14110#33271.7260295637 29.10 Acres Construction DisturbanceRNG 1222.05 BLM#SUMMERVILLE#14110#33271.7260295637 35.83 Acres Construction DisturbanceRNG 1222.05 BLM#SUMMERVILLE#14110#33271.7260295637 5.14 Acres Operation DisturbanceRNG 1222.05 BLM#SUMMERVILLE#14110#33271.7260295637 6.35 Acres Operation DisturbanceRNG 1222.05 BLM#TRAIL SPRINGS#14113#27383.7239866892 8.43 Acres Construction DisturbanceRNG 1222.05 BLM#TRAIL SPRINGS#14113#27383.7239866892 8.43 Acres Construction DisturbanceRNG 1222.05 BLM#TRAIL SPRINGS#14113#27383.7239866892 1.26 Acres Operation DisturbanceRNG 1222.05 BLM#VICTOR#04114#9697.37799007572 0.15 Acres Construction DisturbanceRNG 1222.05 BLM#VICTOR#04114#9697.37799007572 1.03 Acres Construction DisturbanceRNG 1222.05 BLM#VICTOR#04114#9697.37799007572 0.05 Acres Operation DisturbanceRNG 1222.05 BLM#VICTOR#04114#9697.37799007572 0.31 Acres Operation DisturbanceRNG 1222.05 BLM#WASHBOARD#04115#11222.0097271457 15.11 Acres Construction DisturbanceRNG 1222.05 BLM#WASHBOARD#04115#11222.0097271457 15.12 Acres Construction DisturbanceRNG 1222.05 BLM#WASHBOARD#04115#11222.0097271457 2.69 Acres Operation DisturbanceRNG 1222.05 BLM#WASHBOARD#04115#11222.0097271457 2.69 Acres Operation DisturbanceRNG 1222.3 BLM#POISON SPR. BENCH#24091#11859.2119591307 1.11 Acres Construction DisturbanceRNG 1222.3 BLM#POISON SPR. BENCH#24091#11859.2119591307 27.14 Acres Construction DisturbanceRNG 1222.3 BLM#POISON SPR. BENCH#24091#11859.2119591307 0.53 Acres Operation DisturbanceRNG 1222.3 BLM#POISON SPR. BENCH#24091#11859.2119591307 9.57 Acres Operation DisturbanceRNG 1222.3 BLM#WASHBOARD#04115#11222.0097271457 11.23 Acres Construction DisturbanceRNG 1222.3 BLM#WASHBOARD#04115#11222.0097271457 17.79 Acres Construction DisturbanceRNG 1222.3 BLM#WASHBOARD#04115#11222.0097271457 3.49 Acres Operation DisturbanceRNG 1222.3 BLM#WASHBOARD#04115#11222.0097271457 5.03 Acres Operation DisturbanceRNG 1222.3 BLM#WEST HUNTINGTON#25092#17380.0359717832 19.93 Acres Construction Disturbance

Page 178: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

RNG 1222.3 BLM#WEST HUNTINGTON#25092#17380.0359717832 4.72 Acres Operation DisturbanceRNG 1223 BLM#GORDON CRK WITHDRAWL#14130#21831.6729311758 2.03 Acres Construction DisturbanceRNG 1223 BLM#GORDON CRK WITHDRAWL#14130#21831.6729311758 51.05 Acres Construction DisturbanceRNG 1223 BLM#GORDON CRK WITHDRAWL#14130#21831.6729311758 0.62 Acres Operation DisturbanceRNG 1223 BLM#GORDON CRK WITHDRAWL#14130#21831.6729311758 11.54 Acres Operation DisturbanceRNG 1223 BLM#HALEY CANYON#34051#3249.27045898779 6.34 Acres Construction DisturbanceRNG 1223 BLM#HALEY CANYON#34051#3249.27045898779 6.40 Acres Construction DisturbanceRNG 1223 BLM#HALEY CANYON#34051#3249.27045898779 1.64 Acres Operation DisturbanceRNG 1223 BLM#HALEY CANYON#34051#3249.27045898779 1.65 Acres Operation DisturbanceRNG 1223 BLM#HIAWATHA#24052#5235.47312466831 19.42 Acres Construction DisturbanceRNG 1223 BLM#HIAWATHA#24052#5235.47312466831 34.48 Acres Construction DisturbanceRNG 1223 BLM#HIAWATHA#24052#5235.47312466831 5.20 Acres Operation DisturbanceRNG 1223 BLM#HIAWATHA#24052#5235.47312466831 9.56 Acres Operation DisturbanceRNG 1223 BLM#LONG BENCH#14135#7571.22614817407 1.93 Acres Construction DisturbanceRNG 1223 BLM#LONG BENCH#14135#7571.22614817407 55.90 Acres Construction DisturbanceRNG 1223 BLM#LONG BENCH#14135#7571.22614817407 0.62 Acres Operation DisturbanceRNG 1223 BLM#LONG BENCH#14135#7571.22614817407 12.40 Acres Operation DisturbanceRNG 1223 BLM#MILLER CREEK#34074#10529.9827307956 1.90 Acres Construction DisturbanceRNG 1223 BLM#MILLER CREEK#34074#10529.9827307956 0.96 Acres Operation DisturbanceRNG 1223 BLM#NORTH SPRING#34082#7863.88665602503 24.46 Acres Construction DisturbanceRNG 1223 BLM#NORTH SPRING#34082#7863.88665602503 24.70 Acres Construction DisturbanceRNG 1223 BLM#NORTH SPRING#34082#7863.88665602503 4.96 Acres Operation DisturbanceRNG 1223 BLM#NORTH SPRING#34082#7863.88665602503 5.08 Acres Operation DisturbanceRNG 1223 BLM#POISON SPR. BENCH#24091#11859.2119591307 0.01 Acres Construction DisturbanceRNG 1223 BLM#POISON SPR. BENCH#24091#11859.2119591307 0.01 Acres Operation DisturbanceRNG 1223 BLM#WASHBOARD#04115#11222.0097271457 1.92 Acres Construction DisturbanceRNG 1223 BLM#WASHBOARD#04115#11222.0097271457 14.14 Acres Construction DisturbanceRNG 1223 BLM#WASHBOARD#04115#11222.0097271457 0.75 Acres Operation DisturbanceRNG 1223 BLM#WASHBOARD#04115#11222.0097271457 5.27 Acres Operation DisturbanceRNG 1223 BLM#WATTIS#14118#5743.2413557128 23.92 Acres Construction DisturbanceRNG 1223 BLM#WATTIS#14118#5743.2413557128 44.39 Acres Construction DisturbanceRNG 1223 BLM#WATTIS#14118#5743.2413557128 6.14 Acres Operation DisturbanceRNG 1223 BLM#WATTIS#14118#5743.2413557128 10.66 Acres Operation DisturbanceRNG 1225.2 BLM#BUCKHORN#55005#47156.2392837258 55.90 Acres Construction DisturbanceRNG 1225.2 BLM#BUCKHORN#55005#47156.2392837258 66.78 Acres Construction DisturbanceRNG 1225.2 BLM#BUCKHORN#55005#47156.2392837258 13.48 Acres Operation DisturbanceRNG 1225.2 BLM#BUCKHORN#55005#47156.2392837258 15.86 Acres Operation DisturbanceRNG 1225.2 BLM#CALF CANYON#34016#7561.37930203106 4.75 Acres Construction DisturbanceRNG 1225.2 BLM#CALF CANYON#34016#7561.37930203106 1.28 Acres Operation DisturbanceRNG 1225.2 BLM#CHIMNEY ROCK FLAT#44022#46641.0592799872 19.55 Acres Construction DisturbanceRNG 1225.2 BLM#CHIMNEY ROCK FLAT#44022#46641.0592799872 122.94 Acres Construction DisturbanceRNG 1225.2 BLM#CHIMNEY ROCK FLAT#44022#46641.0592799872 4.86 Acres Operation DisturbanceRNG 1225.2 BLM#CHIMNEY ROCK FLAT#44022#46641.0592799872 26.12 Acres Operation DisturbanceRNG 1225.2 BLM#LITTLE HOLES#35039#10477.3748093144 0.48 Acres Construction DisturbanceRNG 1225.2 BLM#LITTLE HOLES#35039#10477.3748093144 65.64 Acres Construction Disturbance

Page 179: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

RNG 1225.2 BLM#LITTLE HOLES#35039#10477.3748093144 0.17 Acres Operation DisturbanceRNG 1225.2 BLM#LITTLE HOLES#35039#10477.3748093144 13.23 Acres Operation DisturbanceRNG 1225.2 BLM#LOOKOFF#34068#5864.46581311287 0.43 Acres Construction DisturbanceRNG 1225.2 BLM#LOOKOFF#34068#5864.46581311287 0.54 Acres Construction DisturbanceRNG 1225.2 BLM#LOOKOFF#34068#5864.46581311287 0.15 Acres Operation DisturbanceRNG 1225.2 BLM#LOOKOFF#34068#5864.46581311287 0.19 Acres Operation DisturbanceRNG 1225.2 BLM#O.E.J.#35068#280.877087118261 0.34 Acres Construction DisturbanceRNG 1225.2 BLM#O.E.J.#35068#280.877087118261 0.35 Acres Construction DisturbanceRNG 1225.2 BLM#O.E.J.#35068#280.877087118261 0.12 Acres Operation DisturbanceRNG 1225.2 BLM#O.E.J.#35068#280.877087118261 0.12 Acres Operation DisturbanceRNG 1225.2 BLM#OIL DOME#25059#1391.06935685539 11.92 Acres Construction DisturbanceRNG 1225.2 BLM#OIL DOME#25059#1391.06935685539 12.13 Acres Construction DisturbanceRNG 1225.2 BLM#OIL DOME#25059#1391.06935685539 2.32 Acres Operation DisturbanceRNG 1225.2 BLM#OIL DOME#25059#1391.06935685539 2.36 Acres Operation DisturbanceRNG 1225.2 BLM#R.J.#25066#2621.29281449135 3.41 Acres Construction DisturbanceRNG 1225.2 BLM#R.J.#25066#2621.29281449135 4.17 Acres Construction DisturbanceRNG 1225.2 BLM#R.J.#25066#2621.29281449135 0.67 Acres Operation DisturbanceRNG 1225.2 BLM#R.J.#25066#2621.29281449135 0.94 Acres Operation DisturbanceRNG 1225.2 BLM#RED SEEPS#25068#25494.3316029222 47.05 Acres Construction DisturbanceRNG 1225.2 BLM#RED SEEPS#25068#25494.3316029222 50.82 Acres Construction DisturbanceRNG 1225.2 BLM#RED SEEPS#25068#25494.3316029222 10.65 Acres Operation DisturbanceRNG 1225.2 BLM#RED SEEPS#25068#25494.3316029222 11.54 Acres Operation DisturbanceRNG 1225.2 BLM#SUMMERVILLE#14110#33271.7260295637 128.50 Acres Construction DisturbanceRNG 1225.2 BLM#SUMMERVILLE#14110#33271.7260295637 131.49 Acres Construction DisturbanceRNG 1225.2 BLM#SUMMERVILLE#14110#33271.7260295637 22.09 Acres Operation DisturbanceRNG 1225.2 BLM#SUMMERVILLE#14110#33271.7260295637 23.07 Acres Operation DisturbanceRNG 1225.2 BLM#TRAIL SPRINGS#14113#27383.7239866892 66.51 Acres Construction DisturbanceRNG 1225.2 BLM#TRAIL SPRINGS#14113#27383.7239866892 66.86 Acres Construction DisturbanceRNG 1225.2 BLM#TRAIL SPRINGS#14113#27383.7239866892 12.53 Acres Operation DisturbanceRNG 1225.2 BLM#TRAIL SPRINGS#14113#27383.7239866892 12.66 Acres Operation DisturbanceRNG 1270 BLM#R.J.#25066#2621.29281449135 0.28 Acres Construction DisturbanceRNG 1270 BLM#R.J.#25066#2621.29281449135 0.30 Acres Construction DisturbanceRNG 1270 BLM#R.J.#25066#2621.29281449135 0.08 Acres Operation DisturbanceRNG 1270 BLM#R.J.#25066#2621.29281449135 0.08 Acres Operation DisturbanceRNG 1270 BLM#WEST HUNTINGTON#25092#17380.0359717832 8.85 Acres Construction DisturbanceRNG 1270 BLM#WEST HUNTINGTON#25092#17380.0359717832 88.21 Acres Construction DisturbanceRNG 1270 BLM#WEST HUNTINGTON#25092#17380.0359717832 1.66 Acres Operation DisturbanceRNG 1270 BLM#WEST HUNTINGTON#25092#17380.0359717832 15.83 Acres Operation DisturbanceRNG 1270 BLM#WILBERG#25094#5508.56191500892 7.35 Acres Construction DisturbanceRNG 1270 BLM#WILBERG#25094#5508.56191500892 8.01 Acres Construction DisturbanceRNG 1270 BLM#WILBERG#25094#5508.56191500892 2.18 Acres Operation DisturbanceRNG 1270 BLM#WILBERG#25094#5508.56191500892 2.40 Acres Operation DisturbanceRNG 1310 BLM#APPLE SPRING#01702#3806.24962544208 14.26 Acres Construction DisturbanceRNG 1310 BLM#APPLE SPRING#01702#3806.24962544208 34.70 Acres Construction DisturbanceRNG 1310 BLM#APPLE SPRING#01702#3806.24962544208 6.15 Acres Operation Disturbance

Page 180: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

RNG 1310 BLM#APPLE SPRING#01702#3806.24962544208 14.30 Acres Operation DisturbanceRNG 1310 BLM#HOP CREEK#01709#2566.16543612515 5.48 Acres Construction DisturbanceRNG 1310 BLM#HOP CREEK#01709#2566.16543612515 29.18 Acres Construction DisturbanceRNG 1310 BLM#HOP CREEK#01709#2566.16543612515 2.27 Acres Operation DisturbanceRNG 1310 BLM#HOP CREEK#01709#2566.16543612515 11.17 Acres Operation DisturbanceRNG 1310 BLM#INDIAN HOLLOW#01711#1773.53980930231 6.44 Acres Construction DisturbanceRNG 1310 BLM#INDIAN HOLLOW#01711#1773.53980930231 12.00 Acres Construction DisturbanceRNG 1310 BLM#INDIAN HOLLOW#01711#1773.53980930231 3.55 Acres Operation DisturbanceRNG 1310 BLM#INDIAN HOLLOW#01711#1773.53980930231 6.34 Acres Operation DisturbanceRNG 1310 BLM#UINTA#01729#1027.59388800285 0.23 Acres Construction DisturbanceRNG 1310 BLM#UINTA#01729#1027.59388800285 0.15 Acres Operation DisturbanceRNG 1310 BLM#WEST HUNTINGTON#25092#17380.0359717832 8.54 Acres Construction DisturbanceRNG 1310 BLM#WEST HUNTINGTON#25092#17380.0359717832 103.78 Acres Construction DisturbanceRNG 1310 BLM#WEST HUNTINGTON#25092#17380.0359717832 2.22 Acres Operation DisturbanceRNG 1310 BLM#WEST HUNTINGTON#25092#17380.0359717832 26.50 Acres Operation DisturbanceRNG 1310 USFS#BOOTH CANYON#00309#2670.90982229739 25.54 Acres Construction DisturbanceRNG 1310 USFS#BOOTH CANYON#00309#2670.90982229739 25.47 Acres Construction DisturbanceRNG 1310 USFS#BOOTH CANYON#00309#2670.90982229739 7.49 Acres Operation DisturbanceRNG 1310 USFS#BOOTH CANYON#00309#2670.90982229739 7.45 Acres Operation DisturbanceRNG 1310 USFS#EAST MOUNTAIN#00201#18278.3421300917 56.27 Acres Construction DisturbanceRNG 1310 USFS#EAST MOUNTAIN#00201#18278.3421300917 107.15 Acres Construction DisturbanceRNG 1310 USFS#EAST MOUNTAIN#00201#18278.3421300917 15.58 Acres Operation DisturbanceRNG 1310 USFS#EAST MOUNTAIN#00201#18278.3421300917 31.25 Acres Operation DisturbanceRNG 1310 USFS#FLY-BULGER S&G#00214#6862.54413129928 0.26 Acres Construction DisturbanceRNG 1310 USFS#FLY-BULGER S&G#00214#6862.54413129928 0.26 Acres Construction DisturbanceRNG 1310 USFS#FLY-BULGER S&G#00214#6862.54413129928 0.17 Acres Operation DisturbanceRNG 1310 USFS#FLY-BULGER S&G#00214#6862.54413129928 0.17 Acres Operation DisturbanceRNG 1310 USFS#FOUNTAIN GREEN S & G#00136#12277.3763273621 0.00 Acres Construction DisturbanceRNG 1310 USFS#FOUNTAIN GREEN S & G#00136#12277.3763273621 0.01 Acres Construction DisturbanceRNG 1310 USFS#FOUNTAIN GREEN S & G#00136#12277.3763273621 0.00 Acres Operation DisturbanceRNG 1310 USFS#FOUNTAIN GREEN S & G#00136#12277.3763273621 0.01 Acres Operation DisturbanceRNG 1310 USFS#GENTRY#00302#34606.2835713242 35.17 Acres Construction DisturbanceRNG 1310 USFS#GENTRY#00302#34606.2835713242 37.22 Acres Construction DisturbanceRNG 1310 USFS#GENTRY#00302#34606.2835713242 9.60 Acres Operation DisturbanceRNG 1310 USFS#GENTRY#00302#34606.2835713242 10.75 Acres Operation DisturbanceRNG 1310 USFS#JOES VALLEY#00220#8191.68460005489 43.89 Acres Construction DisturbanceRNG 1310 USFS#JOES VALLEY#00220#8191.68460005489 43.91 Acres Construction DisturbanceRNG 1310 USFS#JOES VALLEY#00220#8191.68460005489 13.44 Acres Operation DisturbanceRNG 1310 USFS#JOES VALLEY#00220#8191.68460005489 13.41 Acres Operation DisturbanceRNG 1310 USFS#POTTER CANYON#00224#3346.14063333151 52.26 Acres Construction DisturbanceRNG 1310 USFS#POTTER CANYON#00224#3346.14063333151 52.13 Acres Construction DisturbanceRNG 1310 USFS#POTTER CANYON#00224#3346.14063333151 14.24 Acres Operation DisturbanceRNG 1310 USFS#POTTER CANYON#00224#3346.14063333151 14.16 Acres Operation DisturbanceRNG 1310 USFS#SKYLINE S & G#00129#8011.23864723381 47.86 Acres Construction DisturbanceRNG 1310 USFS#SKYLINE S & G#00129#8011.23864723381 47.83 Acres Construction Disturbance

Page 181: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

RNG 1310 USFS#SKYLINE S & G#00129#8011.23864723381 14.75 Acres Operation DisturbanceRNG 1310 USFS#SKYLINE S & G#00129#8011.23864723381 14.70 Acres Operation DisturbanceRNG 1310 USFS#South Skyline S & G#00343#11683.3664215797 10.45 Acres Construction DisturbanceRNG 1310 USFS#South Skyline S & G#00343#11683.3664215797 10.42 Acres Construction DisturbanceRNG 1310 USFS#South Skyline S & G#00343#11683.3664215797 3.30 Acres Operation DisturbanceRNG 1310 USFS#South Skyline S & G#00343#11683.3664215797 3.28 Acres Operation DisturbanceRNG 1310 USFS#TRAIL MT#00206#24627.176310957 77.08 Acres Construction DisturbanceRNG 1310 USFS#TRAIL MT#00206#24627.176310957 79.19 Acres Construction DisturbanceRNG 1310 USFS#TRAIL MT#00206#24627.176310957 21.81 Acres Operation DisturbanceRNG 1310 USFS#TRAIL MT#00206#24627.176310957 22.80 Acres Operation DisturbanceRNG 1320.05 BLM#BOHEMIAN BOTTOMS#05840#11544.2908729273 32.63 Acres Construction DisturbanceRNG 1320.05 BLM#BOHEMIAN BOTTOMS#05840#11544.2908729273 38.57 Acres Construction DisturbanceRNG 1320.05 BLM#BOHEMIAN BOTTOMS#05840#11544.2908729273 6.04 Acres Operation DisturbanceRNG 1320.05 BLM#BOHEMIAN BOTTOMS#05840#11544.2908729273 6.99 Acres Operation DisturbanceRNG 1320.05 BLM#HORSESHOE BEND#05814#3012.63608759138 0.33 Acres Construction DisturbanceRNG 1320.05 BLM#HORSESHOE BEND#05814#3012.63608759138 0.11 Acres Operation DisturbanceRNG 1320.05 BLM#OURAY ROAD#15802#11961.2803559385 48.14 Acres Construction DisturbanceRNG 1320.05 BLM#OURAY ROAD#15802#11961.2803559385 49.54 Acres Construction DisturbanceRNG 1320.05 BLM#OURAY ROAD#15802#11961.2803559385 7.92 Acres Operation DisturbanceRNG 1320.05 BLM#OURAY ROAD#15802#11961.2803559385 8.33 Acres Operation DisturbanceRNG 1320.05 BLM#OURAY VALLEY#15815#732.958438275056 0.12 Acres Construction DisturbanceRNG 1320.05 BLM#OURAY VALLEY#15815#732.958438275056 0.12 Acres Construction DisturbanceRNG 1320.05 BLM#OURAY VALLEY#15815#732.958438275056 0.04 Acres Operation DisturbanceRNG 1320.05 BLM#OURAY VALLEY#15815#732.958438275056 0.04 Acres Operation DisturbanceRNG 1320.05 BLM#SPLIT MOUNTAIN#03111#120800.283699591 24.04 Acres Construction DisturbanceRNG 1320.05 BLM#SPLIT MOUNTAIN#03111#120800.283699591 24.12 Acres Construction DisturbanceRNG 1320.05 BLM#SPLIT MOUNTAIN#03111#120800.283699591 4.57 Acres Operation DisturbanceRNG 1320.05 BLM#SPLIT MOUNTAIN#03111#120800.283699591 4.60 Acres Operation DisturbanceRNG 1320.05 BLM#STIRRUP#15847#3342.90961205725 0.10 Acres Construction DisturbanceRNG 1320.05 BLM#STIRRUP#15847#3342.90961205725 0.03 Acres Operation DisturbanceRNG 1320.05 BLM#TWELVE MILE#15813#50291.6966236469 39.34 Acres Construction DisturbanceRNG 1320.05 BLM#TWELVE MILE#15813#50291.6966236469 52.86 Acres Construction DisturbanceRNG 1320.05 BLM#TWELVE MILE#15813#50291.6966236469 7.68 Acres Operation DisturbanceRNG 1320.05 BLM#TWELVE MILE#15813#50291.6966236469 10.39 Acres Operation DisturbanceRNG 1320.15 BLM#ISO TRACT - LUDLOW#04095#460.729171047479 2.05 Acres Construction DisturbanceRNG 1320.15 BLM#ISO TRACT - LUDLOW#04095#460.729171047479 2.13 Acres Construction DisturbanceRNG 1320.15 BLM#ISO TRACT - LUDLOW#04095#460.729171047479 1.06 Acres Operation DisturbanceRNG 1320.15 BLM#ISO TRACT - LUDLOW#04095#460.729171047479 1.11 Acres Operation DisturbanceRNG 1320.15 USFS#BILLIES MOUNTAIN#00803#3220.95333524456 0.04 Acres Construction DisturbanceRNG 1320.15 USFS#BILLIES MOUNTAIN#00803#3220.95333524456 0.55 Acres Construction DisturbanceRNG 1320.15 USFS#BILLIES MOUNTAIN#00803#3220.95333524456 0.03 Acres Operation DisturbanceRNG 1320.15 USFS#BILLIES MOUNTAIN#00803#3220.95333524456 0.39 Acres Operation DisturbanceRNG 1320.15 USFS#CEDAR KNOLLS S & G#00354#5717.59239726357 6.85 Acres Construction DisturbanceRNG 1320.15 USFS#CEDAR KNOLLS S & G#00354#5717.59239726357 6.87 Acres Construction DisturbanceRNG 1320.15 USFS#CEDAR KNOLLS S & G#00354#5717.59239726357 4.86 Acres Operation Disturbance

Page 182: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

RNG 1320.15 USFS#CEDAR KNOLLS S & G#00354#5717.59239726357 4.87 Acres Operation DisturbanceRNG 1320.15 USFS#DIAMOND FORK#00813#90743.2467064413 9.35 Acres Construction DisturbanceRNG 1320.15 USFS#DIAMOND FORK#00813#90743.2467064413 9.53 Acres Construction DisturbanceRNG 1320.15 USFS#DIAMOND FORK#00813#90743.2467064413 6.64 Acres Operation DisturbanceRNG 1320.15 USFS#DIAMOND FORK#00813#90743.2467064413 6.76 Acres Operation DisturbanceRNG 1320.15 USFS#LAKE FORK C & H#00303#30519.7775431736 6.89 Acres Construction DisturbanceRNG 1320.15 USFS#LAKE FORK C & H#00303#30519.7775431736 6.93 Acres Construction DisturbanceRNG 1320.15 USFS#LAKE FORK C & H#00303#30519.7775431736 3.56 Acres Operation DisturbanceRNG 1320.15 USFS#LAKE FORK C & H#00303#30519.7775431736 3.58 Acres Operation DisturbanceRNG 1320.15 USFS#NEPHI-SALT CREEK#00815#41181.6222879384 0.70 Acres Construction DisturbanceRNG 1320.15 USFS#NEPHI-SALT CREEK#00815#41181.6222879384 0.85 Acres Construction DisturbanceRNG 1320.15 USFS#NEPHI-SALT CREEK#00815#41181.6222879384 0.19 Acres Operation DisturbanceRNG 1320.15 USFS#NEPHI-SALT CREEK#00815#41181.6222879384 0.23 Acres Operation DisturbanceRNG 1320.2 BLM#HOP CREEK#01709#2566.16543612515 1.60 Acres Construction DisturbanceRNG 1320.2 BLM#HOP CREEK#01709#2566.16543612515 2.10 Acres Construction DisturbanceRNG 1320.2 BLM#HOP CREEK#01709#2566.16543612515 1.14 Acres Operation DisturbanceRNG 1320.2 BLM#HOP CREEK#01709#2566.16543612515 1.50 Acres Operation DisturbanceRNG 1320.2 BLM#UINTA#01729#1027.59388800285 0.21 Acres Construction DisturbanceRNG 1320.2 BLM#UINTA#01729#1027.59388800285 0.25 Acres Construction DisturbanceRNG 1320.2 BLM#UINTA#01729#1027.59388800285 0.15 Acres Operation DisturbanceRNG 1320.2 BLM#UINTA#01729#1027.59388800285 0.18 Acres Operation DisturbanceRNG 1320.2 USFS#NEPHI-SALT CREEK#00815#41181.6222879384 0.43 Acres Construction DisturbanceRNG 1320.2 USFS#NEPHI-SALT CREEK#00815#41181.6222879384 0.43 Acres Construction DisturbanceRNG 1320.2 USFS#NEPHI-SALT CREEK#00815#41181.6222879384 0.31 Acres Operation DisturbanceRNG 1320.2 USFS#NEPHI-SALT CREEK#00815#41181.6222879384 0.31 Acres Operation DisturbanceRNG 1320.21 USFS#NEPHI-SALT CREEK#00815#41181.6222879384 0.01 Acres Construction DisturbanceRNG 1320.21 USFS#NEPHI-SALT CREEK#00815#41181.6222879384 0.01 Acres Construction DisturbanceRNG 1320.21 USFS#NEPHI-SALT CREEK#00815#41181.6222879384 0.00 Acres Operation DisturbanceRNG 1320.21 USFS#NEPHI-SALT CREEK#00815#41181.6222879384 0.00 Acres Operation DisturbanceRNG 1323.02 USFS#BROAD HOLLOW/PETE'S KNOLL#00307#5160.6713747832 32.42 Acres Construction DisturbanceRNG 1323.02 USFS#BROAD HOLLOW/PETE'S KNOLL#00307#5160.6713747832 8.07 Acres Operation DisturbanceRNG 1323.02 USFS#CENTER CANYON#00310#5323.90474838427 30.52 Acres Construction DisturbanceRNG 1323.02 USFS#CENTER CANYON#00310#5323.90474838427 7.68 Acres Operation DisturbanceRNG 1323.02 USFS#TRAIL HOLLOW#00353#2686.72722068079 0.42 Acres Construction DisturbanceRNG 1323.02 USFS#TRAIL HOLLOW#00353#2686.72722068079 0.12 Acres Operation DisturbanceRNG 1324 USFS#CENTER CANYON#00310#5323.90474838427 8.37 Acres Construction DisturbanceRNG 1324 USFS#CENTER CANYON#00310#5323.90474838427 8.37 Acres Construction DisturbanceRNG 1324 USFS#CENTER CANYON#00310#5323.90474838427 2.68 Acres Operation DisturbanceRNG 1324 USFS#CENTER CANYON#00310#5323.90474838427 2.68 Acres Operation DisturbanceRNG 1324 USFS#CHIPMAN#00311#4602.06849346183 0.21 Acres Construction DisturbanceRNG 1324 USFS#CHIPMAN#00311#4602.06849346183 0.21 Acres Construction DisturbanceRNG 1324 USFS#CHIPMAN#00311#4602.06849346183 0.07 Acres Operation DisturbanceRNG 1324 USFS#CHIPMAN#00311#4602.06849346183 0.07 Acres Operation DisturbanceRNG 1324 USFS#DAVIS#00313#5200.59534514892 54.74 Acres Construction DisturbanceRNG 1324 USFS#DAVIS#00313#5200.59534514892 56.76 Acres Construction Disturbance

Page 183: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

RNG 1324 USFS#DAVIS#00313#5200.59534514892 23.57 Acres Operation DisturbanceRNG 1324 USFS#DAVIS#00313#5200.59534514892 25.00 Acres Operation DisturbanceRNG 1324 USFS#JACOB/BALDY#00806#11627.6789294459 2.57 Acres Construction DisturbanceRNG 1324 USFS#JACOB/BALDY#00806#11627.6789294459 2.57 Acres Construction DisturbanceRNG 1324 USFS#JACOB/BALDY#00806#11627.6789294459 0.86 Acres Operation DisturbanceRNG 1324 USFS#JACOB/BALDY#00806#11627.6789294459 0.86 Acres Operation DisturbanceRNG 1324 USFS#TRAIL HOLLOW#00353#2686.72722068079 12.68 Acres Construction DisturbanceRNG 1324 USFS#TRAIL HOLLOW#00353#2686.72722068079 12.68 Acres Construction DisturbanceRNG 1324 USFS#TRAIL HOLLOW#00353#2686.72722068079 4.28 Acres Operation DisturbanceRNG 1324 USFS#TRAIL HOLLOW#00353#2686.72722068079 4.28 Acres Operation DisturbanceRNG 1324.2 USFS#CENTER CANYON#00310#5323.90474838427 9.34 Acres Construction DisturbanceRNG 1324.2 USFS#CENTER CANYON#00310#5323.90474838427 2.72 Acres Operation DisturbanceRNG 1324.2 USFS#CHIPMAN#00311#4602.06849346183 0.23 Acres Construction DisturbanceRNG 1324.2 USFS#CHIPMAN#00311#4602.06849346183 0.07 Acres Operation DisturbanceRNG 1324.2 USFS#DAVIS#00313#5200.59534514892 61.52 Acres Construction DisturbanceRNG 1324.2 USFS#DAVIS#00313#5200.59534514892 25.29 Acres Operation DisturbanceRNG 1324.2 USFS#JACOB/BALDY#00806#11627.6789294459 2.86 Acres Construction DisturbanceRNG 1324.2 USFS#JACOB/BALDY#00806#11627.6789294459 0.87 Acres Operation DisturbanceRNG 1324.2 USFS#TRAIL HOLLOW#00353#2686.72722068079 14.09 Acres Construction DisturbanceRNG 1324.2 USFS#TRAIL HOLLOW#00353#2686.72722068079 4.33 Acres Operation DisturbanceRNG 1324.4 USFS#CENTER CANYON#00310#5323.90474838427 11.70 Acres Construction DisturbanceRNG 1324.4 USFS#CENTER CANYON#00310#5323.90474838427 2.75 Acres Operation DisturbanceRNG 1324.4 USFS#CHIPMAN#00311#4602.06849346183 0.29 Acres Construction DisturbanceRNG 1324.4 USFS#CHIPMAN#00311#4602.06849346183 0.07 Acres Operation DisturbanceRNG 1324.4 USFS#DAVIS#00313#5200.59534514892 72.77 Acres Construction DisturbanceRNG 1324.4 USFS#DAVIS#00313#5200.59534514892 25.59 Acres Operation DisturbanceRNG 1324.4 USFS#JACOB/BALDY#00806#11627.6789294459 3.55 Acres Construction DisturbanceRNG 1324.4 USFS#JACOB/BALDY#00806#11627.6789294459 0.88 Acres Operation DisturbanceRNG 1324.4 USFS#TRAIL HOLLOW#00353#2686.72722068079 17.52 Acres Construction DisturbanceRNG 1324.4 USFS#TRAIL HOLLOW#00353#2686.72722068079 4.39 Acres Operation DisturbanceRNG 1325 USFS#DAVIS#00313#5200.59534514892 0.60 Acres Construction DisturbanceRNG 1325 USFS#DAVIS#00313#5200.59534514892 0.60 Acres Construction DisturbanceRNG 1325 USFS#DAVIS#00313#5200.59534514892 0.24 Acres Operation DisturbanceRNG 1325 USFS#DAVIS#00313#5200.59534514892 0.24 Acres Operation DisturbanceRNG 1325 USFS#DIAMOND FORK#00813#90743.2467064413 111.67 Acres Construction DisturbanceRNG 1325 USFS#DIAMOND FORK#00813#90743.2467064413 113.51 Acres Construction DisturbanceRNG 1325 USFS#DIAMOND FORK#00813#90743.2467064413 46.20 Acres Operation DisturbanceRNG 1325 USFS#DIAMOND FORK#00813#90743.2467064413 46.92 Acres Operation DisturbanceRNG 1325 USFS#JACOB/BALDY#00806#11627.6789294459 42.07 Acres Construction DisturbanceRNG 1325 USFS#JACOB/BALDY#00806#11627.6789294459 42.07 Acres Construction DisturbanceRNG 1325 USFS#JACOB/BALDY#00806#11627.6789294459 16.21 Acres Operation DisturbanceRNG 1325 USFS#JACOB/BALDY#00806#11627.6789294459 16.21 Acres Operation DisturbanceRNG 1325 USFS#STREEPER CREEK SOUTH#00351#3240.81147656894 0.11 Acres Construction DisturbanceRNG 1325 USFS#STREEPER CREEK SOUTH#00351#3240.81147656894 0.11 Acres Construction DisturbanceRNG 1325 USFS#STREEPER CREEK SOUTH#00351#3240.81147656894 0.08 Acres Operation Disturbance

Page 184: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

RNG 1325.1 BLM#ARGYLE RIDGE#04873#20708.8718368034 2.02 Acres Construction DisturbanceRNG 1325.1 BLM#ARGYLE RIDGE#04873#20708.8718368034 3.45 Acres Construction DisturbanceRNG 1325.1 BLM#ARGYLE RIDGE#04873#20708.8718368034 0.79 Acres Operation DisturbanceRNG 1325.1 BLM#ARGYLE RIDGE#04873#20708.8718368034 1.00 Acres Operation DisturbanceRNG 1330.1 BLM#AURORA#00200#15580.4715355567 34.26 Acres Construction DisturbanceRNG 1330.1 BLM#AURORA#00200#15580.4715355567 54.60 Acres Construction DisturbanceRNG 1330.1 BLM#AURORA#00200#15580.4715355567 11.92 Acres Operation DisturbanceRNG 1330.1 BLM#AURORA#00200#15580.4715355567 18.61 Acres Operation DisturbanceRNG 1330.1 BLM#BUNDERSON#35006#816.533265950349 3.54 Acres Construction DisturbanceRNG 1330.1 BLM#BUNDERSON#35006#816.533265950349 10.86 Acres Construction DisturbanceRNG 1330.1 BLM#BUNDERSON#35006#816.533265950349 0.98 Acres Operation DisturbanceRNG 1330.1 BLM#BUNDERSON#35006#816.533265950349 2.48 Acres Operation DisturbanceRNG 1330.1 BLM#CHICKEN COOP#00203#6628.81144391818 21.68 Acres Construction DisturbanceRNG 1330.1 BLM#CHICKEN COOP#00203#6628.81144391818 28.71 Acres Construction DisturbanceRNG 1330.1 BLM#CHICKEN COOP#00203#6628.81144391818 4.72 Acres Operation DisturbanceRNG 1330.1 BLM#CHICKEN COOP#00203#6628.81144391818 6.54 Acres Operation DisturbanceRNG 1330.1 BLM#CRAWFORD#35014#2662.60611567782 2.83 Acres Construction DisturbanceRNG 1330.1 BLM#CRAWFORD#35014#2662.60611567782 3.01 Acres Construction DisturbanceRNG 1330.1 BLM#CRAWFORD#35014#2662.60611567782 1.55 Acres Operation DisturbanceRNG 1330.1 BLM#CRAWFORD#35014#2662.60611567782 1.62 Acres Operation DisturbanceRNG 1330.1 BLM#CUTLER#05749#118.781062942 0.98 Acres Construction DisturbanceRNG 1330.1 BLM#CUTLER#05749#118.781062942 0.99 Acres Construction DisturbanceRNG 1330.1 BLM#CUTLER#05749#118.781062942 0.32 Acres Operation DisturbanceRNG 1330.1 BLM#CUTLER#05749#118.781062942 0.32 Acres Operation DisturbanceRNG 1330.1 BLM#DEEP WASH#35016#3850.74642786278 5.01 Acres Construction DisturbanceRNG 1330.1 BLM#DEEP WASH#35016#3850.74642786278 6.70 Acres Construction DisturbanceRNG 1330.1 BLM#DEEP WASH#35016#3850.74642786278 2.03 Acres Operation DisturbanceRNG 1330.1 BLM#DEEP WASH#35016#3850.74642786278 2.57 Acres Operation DisturbanceRNG 1330.1 BLM#DEER FOOT#05750#2017.28520395799 3.01 Acres Construction DisturbanceRNG 1330.1 BLM#DEER FOOT#05750#2017.28520395799 3.07 Acres Construction DisturbanceRNG 1330.1 BLM#DEER FOOT#05750#2017.28520395799 1.66 Acres Operation DisturbanceRNG 1330.1 BLM#DEER FOOT#05750#2017.28520395799 1.70 Acres Operation DisturbanceRNG 1330.1 BLM#DENMARK#00224#16045.214543071 9.24 Acres Construction DisturbanceRNG 1330.1 BLM#DENMARK#00224#16045.214543071 14.53 Acres Construction DisturbanceRNG 1330.1 BLM#DENMARK#00224#16045.214543071 3.93 Acres Operation DisturbanceRNG 1330.1 BLM#DENMARK#00224#16045.214543071 5.51 Acres Operation DisturbanceRNG 1330.1 BLM#DRY WASH#25017#9549.85297277703 0.00 Acres Construction DisturbanceRNG 1330.1 BLM#DRY WASH#25017#9549.85297277703 0.00 Acres Construction DisturbanceRNG 1330.1 BLM#DRY WASH#25017#9549.85297277703 0.00 Acres Operation DisturbanceRNG 1330.1 BLM#DRY WASH#25017#9549.85297277703 0.00 Acres Operation DisturbanceRNG 1330.1 BLM#GRABALT#04332#1157.42261169883 2.42 Acres Construction DisturbanceRNG 1330.1 BLM#GRABALT#04332#1157.42261169883 3.06 Acres Construction DisturbanceRNG 1330.1 BLM#GRABALT#04332#1157.42261169883 0.32 Acres Operation DisturbanceRNG 1330.1 BLM#GRABALT#04332#1157.42261169883 0.39 Acres Operation DisturbanceRNG 1330.1 BLM#HAMBRICK BOTTOMS#35026#20703.6589387465 6.07 Acres Construction Disturbance

Page 185: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

RNG 1330.1 BLM#HAMBRICK BOTTOMS#35026#20703.6589387465 6.99 Acres Construction DisturbanceRNG 1330.1 BLM#HAMBRICK BOTTOMS#35026#20703.6589387465 2.43 Acres Operation DisturbanceRNG 1330.1 BLM#HAMBRICK BOTTOMS#35026#20703.6589387465 2.94 Acres Operation DisturbanceRNG 1330.1 BLM#JORGENSEN (FLOYD)#35036#623.67010039787 0.04 Acres Construction DisturbanceRNG 1330.1 BLM#JORGENSEN (FLOYD)#35036#623.67010039787 0.34 Acres Construction DisturbanceRNG 1330.1 BLM#JORGENSEN (FLOYD)#35036#623.67010039787 0.02 Acres Operation DisturbanceRNG 1330.1 BLM#JORGENSEN (FLOYD)#35036#623.67010039787 0.19 Acres Operation DisturbanceRNG 1330.1 BLM#LINK CANYON#35038#3471.6983705265 0.13 Acres Construction DisturbanceRNG 1330.1 BLM#LINK CANYON#35038#3471.6983705265 0.18 Acres Construction DisturbanceRNG 1330.1 BLM#LINK CANYON#35038#3471.6983705265 0.07 Acres Operation DisturbanceRNG 1330.1 BLM#LINK CANYON#35038#3471.6983705265 0.10 Acres Operation DisturbanceRNG 1330.1 BLM#LONE CEDAR#05756#2417.4121562075 1.63 Acres Construction DisturbanceRNG 1330.1 BLM#LONE CEDAR#05756#2417.4121562075 1.57 Acres Construction DisturbanceRNG 1330.1 BLM#LONE CEDAR#05756#2417.4121562075 0.90 Acres Operation DisturbanceRNG 1330.1 BLM#LONE CEDAR#05756#2417.4121562075 0.87 Acres Operation DisturbanceRNG 1330.1 BLM#LONE TREE#35041#121014.076020782 0.81 Acres Construction DisturbanceRNG 1330.1 BLM#LONE TREE#35041#121014.076020782 1.16 Acres Construction DisturbanceRNG 1330.1 BLM#LONE TREE#35041#121014.076020782 0.45 Acres Operation DisturbanceRNG 1330.1 BLM#LONE TREE#35041#121014.076020782 0.64 Acres Operation DisturbanceRNG 1330.1 BLM#M & O#00607#25569.6108378589 0.86 Acres Construction DisturbanceRNG 1330.1 BLM#M & O#00607#25569.6108378589 1.02 Acres Construction DisturbanceRNG 1330.1 BLM#M & O#00607#25569.6108378589 0.48 Acres Operation DisturbanceRNG 1330.1 BLM#M & O#00607#25569.6108378589 0.57 Acres Operation DisturbanceRNG 1330.1 BLM#MOLEN PASTURE#35047#1798.8823850512 0.17 Acres Construction DisturbanceRNG 1330.1 BLM#MOLEN PASTURE#35047#1798.8823850512 0.16 Acres Construction DisturbanceRNG 1330.1 BLM#MOLEN PASTURE#35047#1798.8823850512 0.09 Acres Operation DisturbanceRNG 1330.1 BLM#MOLEN PASTURE#35047#1798.8823850512 0.09 Acres Operation DisturbanceRNG 1330.1 BLM#NEVA#25050#2667.62633133046 19.07 Acres Construction DisturbanceRNG 1330.1 BLM#NEVA#25050#2667.62633133046 19.26 Acres Construction DisturbanceRNG 1330.1 BLM#NEVA#25050#2667.62633133046 6.43 Acres Operation DisturbanceRNG 1330.1 BLM#NEVA#25050#2667.62633133046 6.48 Acres Operation DisturbanceRNG 1330.1 BLM#OLSEN (E)#15061#2289.83909075527 3.53 Acres Construction DisturbanceRNG 1330.1 BLM#OLSEN (E)#15061#2289.83909075527 12.69 Acres Construction DisturbanceRNG 1330.1 BLM#OLSEN (E)#15061#2289.83909075527 0.83 Acres Operation DisturbanceRNG 1330.1 BLM#OLSEN (E)#15061#2289.83909075527 3.37 Acres Operation DisturbanceRNG 1330.1 BLM#PRICE#25065#2722.40698688421 7.78 Acres Construction DisturbanceRNG 1330.1 BLM#PRICE#25065#2722.40698688421 10.44 Acres Construction DisturbanceRNG 1330.1 BLM#PRICE#25065#2722.40698688421 3.06 Acres Operation DisturbanceRNG 1330.1 BLM#PRICE#25065#2722.40698688421 4.18 Acres Operation DisturbanceRNG 1330.1 BLM#R.J.#25066#2621.29281449135 18.39 Acres Construction DisturbanceRNG 1330.1 BLM#R.J.#25066#2621.29281449135 22.82 Acres Construction DisturbanceRNG 1330.1 BLM#R.J.#25066#2621.29281449135 3.75 Acres Operation DisturbanceRNG 1330.1 BLM#R.J.#25066#2621.29281449135 4.88 Acres Operation DisturbanceRNG 1330.1 BLM#SALERATUS#25074#25351.4522055387 90.23 Acres Construction DisturbanceRNG 1330.1 BLM#SALERATUS#25074#25351.4522055387 102.81 Acres Construction Disturbance

Page 186: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

RNG 1330.1 BLM#SALERATUS#25074#25351.4522055387 26.02 Acres Operation DisturbanceRNG 1330.1 BLM#SALERATUS#25074#25351.4522055387 30.04 Acres Operation DisturbanceRNG 1330.1 BLM#SALT WASH#15075#45055.0118586211 46.41 Acres Construction DisturbanceRNG 1330.1 BLM#SALT WASH#15075#45055.0118586211 68.67 Acres Construction DisturbanceRNG 1330.1 BLM#SALT WASH#15075#45055.0118586211 14.76 Acres Operation DisturbanceRNG 1330.1 BLM#SALT WASH#15075#45055.0118586211 20.55 Acres Operation DisturbanceRNG 1330.1 BLM#SORENSEN#25079#8296.28051700077 7.66 Acres Construction DisturbanceRNG 1330.1 BLM#SORENSEN#25079#8296.28051700077 7.61 Acres Construction DisturbanceRNG 1330.1 BLM#SORENSEN#25079#8296.28051700077 4.18 Acres Operation DisturbanceRNG 1330.1 BLM#SORENSEN#25079#8296.28051700077 4.16 Acres Operation DisturbanceRNG 1330.1 BLM#STONE#05768#2462.91584540979 0.28 Acres Construction DisturbanceRNG 1330.1 BLM#STONE#05768#2462.91584540979 0.46 Acres Construction DisturbanceRNG 1330.1 BLM#STONE#05768#2462.91584540979 0.15 Acres Operation DisturbanceRNG 1330.1 BLM#STONE#05768#2462.91584540979 0.25 Acres Operation DisturbanceRNG 1330.1 BLM#T D J#25088#1364.5900942002 1.10 Acres Construction DisturbanceRNG 1330.1 BLM#T D J#25088#1364.5900942002 1.57 Acres Construction DisturbanceRNG 1330.1 BLM#T D J#25088#1364.5900942002 0.61 Acres Operation DisturbanceRNG 1330.1 BLM#T D J#25088#1364.5900942002 0.87 Acres Operation DisturbanceRNG 1330.1 BLM#TUTTLE#25090#860.398711516377 0.61 Acres Construction DisturbanceRNG 1330.1 BLM#TUTTLE#25090#860.398711516377 1.14 Acres Construction DisturbanceRNG 1330.1 BLM#TUTTLE#25090#860.398711516377 0.34 Acres Operation DisturbanceRNG 1330.1 BLM#TUTTLE#25090#860.398711516377 0.63 Acres Operation DisturbanceRNG 1330.1 USFS#Beaver Dams Allotment#04101#7557.58981172882 6.28 Acres Construction DisturbanceRNG 1330.1 USFS#Beaver Dams Allotment#04101#7557.58981172882 6.03 Acres Construction DisturbanceRNG 1330.1 USFS#Beaver Dams Allotment#04101#7557.58981172882 3.47 Acres Operation DisturbanceRNG 1330.1 USFS#Beaver Dams Allotment#04101#7557.58981172882 3.33 Acres Operation DisturbanceRNG 1330.1 USFS#Browns Hole Allotment#04001#49768.4718650838 240.59 Acres Construction DisturbanceRNG 1330.1 USFS#Browns Hole Allotment#04001#49768.4718650838 237.56 Acres Construction DisturbanceRNG 1330.1 USFS#Browns Hole Allotment#04001#49768.4718650838 56.17 Acres Operation DisturbanceRNG 1330.1 USFS#Browns Hole Allotment#04001#49768.4718650838 54.48 Acres Operation DisturbanceRNG 1330.1 USFS#Cedar Ridge Allotment#01001#42975.9589809871 3.95 Acres Construction DisturbanceRNG 1330.1 USFS#Cedar Ridge Allotment#01001#42975.9589809871 3.93 Acres Construction DisturbanceRNG 1330.1 USFS#Cedar Ridge Allotment#01001#42975.9589809871 1.85 Acres Operation DisturbanceRNG 1330.1 USFS#Cedar Ridge Allotment#01001#42975.9589809871 1.83 Acres Operation DisturbanceRNG 1330.1 USFS#Flat Top Allotment#04104#7568.66469610817 28.18 Acres Construction DisturbanceRNG 1330.1 USFS#Flat Top Allotment#04104#7568.66469610817 27.93 Acres Construction DisturbanceRNG 1330.1 USFS#Flat Top Allotment#04104#7568.66469610817 5.42 Acres Operation DisturbanceRNG 1330.1 USFS#Flat Top Allotment#04104#7568.66469610817 5.27 Acres Operation DisturbanceRNG 1330.1 USFS#Meadow Gulch Allotment#04007#16680.3044248059 127.97 Acres Construction DisturbanceRNG 1330.1 USFS#Meadow Gulch Allotment#04007#16680.3044248059 127.16 Acres Construction DisturbanceRNG 1330.1 USFS#Meadow Gulch Allotment#04007#16680.3044248059 27.43 Acres Operation DisturbanceRNG 1330.1 USFS#Meadow Gulch Allotment#04007#16680.3044248059 26.95 Acres Operation DisturbanceRNG 1330.1 USFS#Moroni Peak Allotment#04110#8505.41690065363 0.19 Acres Construction DisturbanceRNG 1330.1 USFS#Moroni Peak Allotment#04110#8505.41690065363 0.18 Acres Construction DisturbanceRNG 1330.1 USFS#Moroni Peak Allotment#04110#8505.41690065363 0.11 Acres Operation Disturbance

Page 187: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

RNG 1330.1 USFS#Moroni Peak Allotment#04110#8505.41690065363 0.10 Acres Operation DisturbanceRNG 1330.1 USFS#Scipio Allotment#01014#18613.0514608013 8.06 Acres Construction DisturbanceRNG 1330.1 USFS#Scipio Allotment#01014#18613.0514608013 7.95 Acres Construction DisturbanceRNG 1330.1 USFS#Scipio Allotment#01014#18613.0514608013 2.38 Acres Operation DisturbanceRNG 1330.1 USFS#Scipio Allotment#01014#18613.0514608013 2.31 Acres Operation DisturbanceRNG 1330.1 USFS#South Water Hollow Allotment#04120#20969.973632345 0.00 Acres Construction DisturbanceRNG 1330.1 USFS#South Water Hollow Allotment#04120#20969.973632345 0.00 Acres Construction DisturbanceRNG 1330.1 USFS#South Water Hollow Allotment#04120#20969.973632345 0.00 Acres Operation DisturbanceRNG 1330.1 USFS#South Water Hollow Allotment#04120#20969.973632345 0.00 Acres Operation DisturbanceRNG 1340 BLM#GARRETT#04505#2021.79216252625 23.01 Acres Construction DisturbanceRNG 1340 BLM#GARRETT#04505#2021.79216252625 2.64 Acres Operation DisturbanceRNG 1340 BLM#NEPHI BENCH#04513#2000.98010747962 6.42 Acres Construction DisturbanceRNG 1340 BLM#NEPHI BENCH#04513#2000.98010747962 6.52 Acres Construction DisturbanceRNG 1340 BLM#NEPHI BENCH#04513#2000.98010747962 1.13 Acres Operation DisturbanceRNG 1340 BLM#NEPHI BENCH#04513#2000.98010747962 1.14 Acres Operation DisturbanceRNG 1340 BLM#PAINT MINE#04515#3822.14682289891 0.72 Acres Construction DisturbanceRNG 1340 BLM#PAINT MINE#04515#3822.14682289891 0.72 Acres Construction DisturbanceRNG 1340 BLM#PAINT MINE#04515#3822.14682289891 0.35 Acres Operation DisturbanceRNG 1340 BLM#PAINT MINE#04515#3822.14682289891 0.35 Acres Operation DisturbanceRNG 1340 BLM#SPRING CANYON#05702#9208.40619361934 0.33 Acres Construction DisturbanceRNG 1340 BLM#SPRING CANYON#05702#9208.40619361934 0.33 Acres Construction DisturbanceRNG 1340 BLM#SPRING CANYON#05702#9208.40619361934 0.16 Acres Operation DisturbanceRNG 1340 BLM#SPRING CANYON#05702#9208.40619361934 0.16 Acres Operation DisturbanceRNG 1340 BLM#STONE QUARRY#05735#4466.57624877567 23.62 Acres Construction DisturbanceRNG 1340 BLM#STONE QUARRY#05735#4466.57624877567 30.87 Acres Construction DisturbanceRNG 1340 BLM#STONE QUARRY#05735#4466.57624877567 5.71 Acres Operation DisturbanceRNG 1340 BLM#STONE QUARRY#05735#4466.57624877567 7.83 Acres Operation DisturbanceRNG 1340 USFS#NEPHI-SALT CREEK#00815#41181.6222879384 0.11 Acres Construction DisturbanceRNG 1340 USFS#NEPHI-SALT CREEK#00815#41181.6222879384 0.11 Acres Construction DisturbanceRNG 1340 USFS#NEPHI-SALT CREEK#00815#41181.6222879384 0.05 Acres Operation DisturbanceRNG 1340 USFS#NEPHI-SALT CREEK#00815#41181.6222879384 0.05 Acres Operation DisturbanceRNG 1350 BLM#SPRING CANYON#05702#9208.40619361934 35.46 Acres Construction DisturbanceRNG 1350 BLM#SPRING CANYON#05702#9208.40619361934 58.23 Acres Construction DisturbanceRNG 1350 BLM#SPRING CANYON#05702#9208.40619361934 11.51 Acres Operation DisturbanceRNG 1350 BLM#SPRING CANYON#05702#9208.40619361934 19.09 Acres Operation DisturbanceRNG 1350 BLM#STONE QUARRY#05735#4466.57624877567 15.24 Acres Construction DisturbanceRNG 1350 BLM#STONE QUARRY#05735#4466.57624877567 16.89 Acres Construction DisturbanceRNG 1350 BLM#STONE QUARRY#05735#4466.57624877567 4.49 Acres Operation DisturbanceRNG 1350 BLM#STONE QUARRY#05735#4466.57624877567 5.18 Acres Operation DisturbanceRNG 1350 USFS#FOURMILE C & H#00137#9162.29801507899 2.90 Acres Construction DisturbanceRNG 1350 USFS#FOURMILE C & H#00137#9162.29801507899 2.90 Acres Construction DisturbanceRNG 1350 USFS#FOURMILE C & H#00137#9162.29801507899 1.20 Acres Operation DisturbanceRNG 1350 USFS#FOURMILE C & H#00137#9162.29801507899 1.20 Acres Operation DisturbanceRNG 1360 BLM#BROAD CANYON#04500#6004.94097797781 0.01 Acres Construction DisturbanceRNG 1360 BLM#BROAD CANYON#04500#6004.94097797781 0.01 Acres Construction Disturbance

Page 188: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

RNG 1360 BLM#BROAD CANYON#04500#6004.94097797781 0.00 Acres Operation DisturbanceRNG 1360 BLM#BROAD CANYON#04500#6004.94097797781 0.00 Acres Operation DisturbanceRNG 1360 BLM#FERNER DOG VALLEY#04502#15441.7757767582 4.21 Acres Construction DisturbanceRNG 1360 BLM#FERNER DOG VALLEY#04502#15441.7757767582 4.69 Acres Construction DisturbanceRNG 1360 BLM#FERNER DOG VALLEY#04502#15441.7757767582 0.88 Acres Operation DisturbanceRNG 1360 BLM#FERNER DOG VALLEY#04502#15441.7757767582 1.05 Acres Operation DisturbanceRNG 1360 BLM#GILSON#04506#22492.7211247289 79.36 Acres Construction DisturbanceRNG 1360 BLM#GILSON#04506#22492.7211247289 80.82 Acres Construction DisturbanceRNG 1360 BLM#GILSON#04506#22492.7211247289 17.58 Acres Operation DisturbanceRNG 1360 BLM#GILSON#04506#22492.7211247289 18.12 Acres Operation DisturbanceRNG 1360 BLM#LYNNDYL#04405#14460.3553570242 13.73 Acres Construction DisturbanceRNG 1360 BLM#LYNNDYL#04405#14460.3553570242 14.70 Acres Construction DisturbanceRNG 1360 BLM#LYNNDYL#04405#14460.3553570242 3.66 Acres Operation DisturbanceRNG 1360 BLM#LYNNDYL#04405#14460.3553570242 4.02 Acres Operation DisturbanceRNG 1360 BLM#MCINTYRE#04511#105634.725150017 6.94 Acres Construction DisturbanceRNG 1360 BLM#MCINTYRE#04511#105634.725150017 8.23 Acres Construction DisturbanceRNG 1360 BLM#MCINTYRE#04511#105634.725150017 1.99 Acres Operation DisturbanceRNG 1360 BLM#MCINTYRE#04511#105634.725150017 2.36 Acres Operation DisturbanceRNG 1360 BLM#NELSON#04512#8852.94990716743 35.33 Acres Construction DisturbanceRNG 1360 BLM#NELSON#04512#8852.94990716743 35.33 Acres Construction DisturbanceRNG 1360 BLM#NELSON#04512#8852.94990716743 8.71 Acres Operation DisturbanceRNG 1360 BLM#NELSON#04512#8852.94990716743 8.71 Acres Operation DisturbanceRNG 1360 BLM#RILEY SPRING#04517#5916.58440599103 13.76 Acres Construction DisturbanceRNG 1360 BLM#RILEY SPRING#04517#5916.58440599103 13.76 Acres Construction DisturbanceRNG 1360 BLM#RILEY SPRING#04517#5916.58440599103 2.79 Acres Operation DisturbanceRNG 1360 BLM#RILEY SPRING#04517#5916.58440599103 2.79 Acres Operation DisturbanceRNG 1360 BLM#ROCKY FORD#04516#9354.8152934561 54.93 Acres Construction DisturbanceRNG 1360 BLM#ROCKY FORD#04516#9354.8152934561 55.64 Acres Construction DisturbanceRNG 1360 BLM#ROCKY FORD#04516#9354.8152934561 10.93 Acres Operation DisturbanceRNG 1360 BLM#ROCKY FORD#04516#9354.8152934561 11.18 Acres Operation DisturbanceRNG 1360 BLM#SAGE VALLEY #17#05730#7631.73462603504 67.04 Acres Construction DisturbanceRNG 1360 BLM#SAGE VALLEY #17#05730#7631.73462603504 67.06 Acres Construction DisturbanceRNG 1360 BLM#SAGE VALLEY #17#05730#7631.73462603504 13.39 Acres Operation DisturbanceRNG 1360 BLM#SAGE VALLEY #17#05730#7631.73462603504 13.39 Acres Operation DisturbanceRNG 1360 BLM#SHEARING#04519#18935.2337078764 0.02 Acres Construction DisturbanceRNG 1360 BLM#SHEARING#04519#18935.2337078764 0.02 Acres Construction DisturbanceRNG 1360 BLM#SHEARING#04519#18935.2337078764 0.01 Acres Operation DisturbanceRNG 1360 BLM#SHEARING#04519#18935.2337078764 0.01 Acres Operation DisturbanceRNG 1360 BLM#STONE QUARRY#05735#4466.57624877567 1.89 Acres Construction DisturbanceRNG 1360 BLM#STONE QUARRY#05735#4466.57624877567 1.92 Acres Construction DisturbanceRNG 1360 BLM#STONE QUARRY#05735#4466.57624877567 0.34 Acres Operation DisturbanceRNG 1360 BLM#STONE QUARRY#05735#4466.57624877567 0.34 Acres Operation DisturbanceRNG 1370 BLM#DUST BOWL#05752#9729.77215730147 10.41 Acres Construction DisturbanceRNG 1370 BLM#DUST BOWL#05752#9729.77215730147 22.77 Acres Construction DisturbanceRNG 1370 BLM#DUST BOWL#05752#9729.77215730147 2.53 Acres Operation Disturbance

Page 189: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

RNG 1370 BLM#DUST BOWL#05752#9729.77215730147 4.84 Acres Operation DisturbanceRNG 1370 BLM#EAST FORK#04357#9693.15531408504 24.32 Acres Construction DisturbanceRNG 1370 BLM#EAST FORK#04357#9693.15531408504 27.79 Acres Construction DisturbanceRNG 1370 BLM#EAST FORK#04357#9693.15531408504 5.82 Acres Operation DisturbanceRNG 1370 BLM#EAST FORK#04357#9693.15531408504 7.20 Acres Operation DisturbanceRNG 1370 BLM#LEAMINGTON PASS#04342#3146.34311953285 2.08 Acres Construction DisturbanceRNG 1370 BLM#LEAMINGTON PASS#04342#3146.34311953285 2.10 Acres Construction DisturbanceRNG 1370 BLM#LEAMINGTON PASS#04342#3146.34311953285 0.44 Acres Operation DisturbanceRNG 1370 BLM#LEAMINGTON PASS#04342#3146.34311953285 0.45 Acres Operation DisturbanceRNG 1370 BLM#SAGE VALLEY #16#05703#5366.03055607938 13.00 Acres Construction DisturbanceRNG 1370 BLM#SAGE VALLEY #16#05703#5366.03055607938 17.34 Acres Construction DisturbanceRNG 1370 BLM#SAGE VALLEY #16#05703#5366.03055607938 2.52 Acres Operation DisturbanceRNG 1370 BLM#SAGE VALLEY #16#05703#5366.03055607938 3.34 Acres Operation DisturbanceRNG 1370 BLM#SAGE VALLEY #17#05730#7631.73462603504 5.06 Acres Construction DisturbanceRNG 1370 BLM#SAGE VALLEY #17#05730#7631.73462603504 5.07 Acres Construction DisturbanceRNG 1370 BLM#SAGE VALLEY #17#05730#7631.73462603504 2.02 Acres Operation DisturbanceRNG 1370 BLM#SAGE VALLEY #17#05730#7631.73462603504 2.02 Acres Operation DisturbanceRNG 1370 BLM#SEVIER RIVER#05765#4746.70679600543 42.54 Acres Construction DisturbanceRNG 1370 BLM#SEVIER RIVER#05765#4746.70679600543 42.77 Acres Construction DisturbanceRNG 1370 BLM#SEVIER RIVER#05765#4746.70679600543 9.54 Acres Operation DisturbanceRNG 1370 BLM#SEVIER RIVER#05765#4746.70679600543 9.65 Acres Operation DisturbanceRNG 1370 BLM#STONE QUARRY#05735#4466.57624877567 1.80 Acres Construction DisturbanceRNG 1370 BLM#STONE QUARRY#05735#4466.57624877567 1.80 Acres Construction DisturbanceRNG 1370 BLM#STONE QUARRY#05735#4466.57624877567 0.28 Acres Operation DisturbanceRNG 1370 BLM#STONE QUARRY#05735#4466.57624877567 0.28 Acres Operation DisturbanceRNG 1370 USFS#Pass Canyon Allotment#01019#1606.68201696305 1.19 Acres Construction DisturbanceRNG 1370 USFS#Pass Canyon Allotment#01019#1606.68201696305 1.21 Acres Construction DisturbanceRNG 1370 USFS#Pass Canyon Allotment#01019#1606.68201696305 0.62 Acres Operation DisturbanceRNG 1370 USFS#Pass Canyon Allotment#01019#1606.68201696305 0.62 Acres Operation DisturbanceRNG 1380 BLM#BERYLLIUM#04400#11894.7256423466 16.72 Acres Construction DisturbanceRNG 1380 BLM#BERYLLIUM#04400#11894.7256423466 29.20 Acres Construction DisturbanceRNG 1380 BLM#BERYLLIUM#04400#11894.7256423466 1.79 Acres Operation DisturbanceRNG 1380 BLM#BERYLLIUM#04400#11894.7256423466 3.20 Acres Operation DisturbanceRNG 1380 USFS#Fool Creek Allotment#01008#22108.1521846434 13.77 Acres Construction DisturbanceRNG 1380 USFS#Fool Creek Allotment#01008#22108.1521846434 13.84 Acres Construction DisturbanceRNG 1380 USFS#Fool Creek Allotment#01008#22108.1521846434 3.61 Acres Operation DisturbanceRNG 1380 USFS#Fool Creek Allotment#01008#22108.1521846434 3.63 Acres Operation DisturbanceRNG 1380 USFS#Pass Canyon Allotment#01019#1606.68201696305 0.71 Acres Construction DisturbanceRNG 1380 USFS#Pass Canyon Allotment#01019#1606.68201696305 0.71 Acres Construction DisturbanceRNG 1380 USFS#Pass Canyon Allotment#01019#1606.68201696305 0.29 Acres Operation DisturbanceRNG 1380 USFS#Pass Canyon Allotment#01019#1606.68201696305 0.29 Acres Operation DisturbanceRNG 1390 BLM#BERYLLIUM#04400#11894.7256423466 3.90 Acres Construction DisturbanceRNG 1390 BLM#BERYLLIUM#04400#11894.7256423466 0.61 Acres Operation DisturbanceRNG 1390 BLM#LYNNDYL#04405#14460.3553570242 30.71 Acres Construction DisturbanceRNG 1390 BLM#LYNNDYL#04405#14460.3553570242 39.39 Acres Construction Disturbance

Page 190: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

RNG 1390 BLM#LYNNDYL#04405#14460.3553570242 5.13 Acres Operation DisturbanceRNG 1390 BLM#LYNNDYL#04405#14460.3553570242 6.58 Acres Operation DisturbanceRNG 1400 BLM#BLUE SPRING#05746#3251.73462173653 13.98 Acres Construction DisturbanceRNG 1400 BLM#BLUE SPRING#05746#3251.73462173653 21.34 Acres Construction DisturbanceRNG 1400 BLM#BLUE SPRING#05746#3251.73462173653 3.07 Acres Operation DisturbanceRNG 1400 BLM#BLUE SPRING#05746#3251.73462173653 4.67 Acres Operation DisturbanceRNG 1400 BLM#DUST BOWL#05752#9729.77215730147 22.53 Acres Construction DisturbanceRNG 1400 BLM#DUST BOWL#05752#9729.77215730147 25.64 Acres Construction DisturbanceRNG 1400 BLM#DUST BOWL#05752#9729.77215730147 5.28 Acres Operation DisturbanceRNG 1400 BLM#DUST BOWL#05752#9729.77215730147 6.09 Acres Operation DisturbanceRNG 1400 BLM#GRABALT#04332#1157.42261169883 6.84 Acres Construction DisturbanceRNG 1400 BLM#GRABALT#04332#1157.42261169883 7.53 Acres Construction DisturbanceRNG 1400 BLM#GRABALT#04332#1157.42261169883 1.46 Acres Operation DisturbanceRNG 1400 BLM#GRABALT#04332#1157.42261169883 1.59 Acres Operation DisturbanceRNG 1400 BLM#JUAB#05755#2470.29805336641 0.13 Acres Construction DisturbanceRNG 1400 BLM#JUAB#05755#2470.29805336641 0.12 Acres Construction DisturbanceRNG 1400 BLM#JUAB#05755#2470.29805336641 0.04 Acres Operation DisturbanceRNG 1400 BLM#JUAB#05755#2470.29805336641 0.04 Acres Operation DisturbanceRNG 1400 BLM#LEAMINGTON PASS#04342#3146.34311953285 4.68 Acres Construction DisturbanceRNG 1400 BLM#LEAMINGTON PASS#04342#3146.34311953285 6.66 Acres Construction DisturbanceRNG 1400 BLM#LEAMINGTON PASS#04342#3146.34311953285 1.10 Acres Operation DisturbanceRNG 1400 BLM#LEAMINGTON PASS#04342#3146.34311953285 1.60 Acres Operation DisturbanceRNG 1400 BLM#NORTH SCIPIO#35034#10376.333041841 12.46 Acres Construction DisturbanceRNG 1400 BLM#NORTH SCIPIO#35034#10376.333041841 75.07 Acres Construction DisturbanceRNG 1400 BLM#NORTH SCIPIO#35034#10376.333041841 2.97 Acres Operation DisturbanceRNG 1400 BLM#NORTH SCIPIO#35034#10376.333041841 16.17 Acres Operation DisturbanceRNG 1400 BLM#RED BUTTE#05761#5177.23582530957 13.48 Acres Construction DisturbanceRNG 1400 BLM#RED BUTTE#05761#5177.23582530957 13.43 Acres Construction DisturbanceRNG 1400 BLM#RED BUTTE#05761#5177.23582530957 3.26 Acres Operation DisturbanceRNG 1400 BLM#RED BUTTE#05761#5177.23582530957 3.25 Acres Operation DisturbanceRNG 1400 BLM#SEVIER RIVER#05765#4746.70679600543 0.01 Acres Construction DisturbanceRNG 1400 BLM#SEVIER RIVER#05765#4746.70679600543 0.02 Acres Construction DisturbanceRNG 1400 BLM#SEVIER RIVER#05765#4746.70679600543 0.00 Acres Operation DisturbanceRNG 1400 BLM#SEVIER RIVER#05765#4746.70679600543 0.01 Acres Operation DisturbanceRNG 1400 BLM#SUMMIT#05769#760.221415725837 0.10 Acres Construction DisturbanceRNG 1400 BLM#SUMMIT#05769#760.221415725837 0.10 Acres Construction DisturbanceRNG 1400 BLM#SUMMIT#05769#760.221415725837 0.03 Acres Operation DisturbanceRNG 1400 BLM#SUMMIT#05769#760.221415725837 0.03 Acres Operation DisturbanceRNG 1400 USFS#Dry Creek Allotment#01007#15192.6322072005 0.34 Acres Construction DisturbanceRNG 1400 USFS#Dry Creek Allotment#01007#15192.6322072005 0.34 Acres Construction DisturbanceRNG 1400 USFS#Dry Creek Allotment#01007#15192.6322072005 0.10 Acres Operation DisturbanceRNG 1400 USFS#Dry Creek Allotment#01007#15192.6322072005 0.10 Acres Operation DisturbanceRNG 1400 USFS#Whiskey Creek Allotment#01016#44891.1876628955 1.60 Acres Construction DisturbanceRNG 1400 USFS#Whiskey Creek Allotment#01016#44891.1876628955 1.96 Acres Construction DisturbanceRNG 1400 USFS#Whiskey Creek Allotment#01016#44891.1876628955 0.46 Acres Operation Disturbance

Page 191: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

RNG 1400 USFS#Whiskey Creek Allotment#01016#44891.1876628955 0.56 Acres Operation DisturbanceRNG 1400 USFS#Wildhorse Allotment#01018#6769.09286524441 0.30 Acres Construction DisturbanceRNG 1400 USFS#Wildhorse Allotment#01018#6769.09286524441 0.30 Acres Construction DisturbanceRNG 1400 USFS#Wildhorse Allotment#01018#6769.09286524441 0.09 Acres Operation DisturbanceRNG 1400 USFS#Wildhorse Allotment#01018#6769.09286524441 0.09 Acres Operation DisturbanceRNG 1400 USFS#Wringer Canyon Allotment#01020#3712.46649125715 0.72 Acres Construction DisturbanceRNG 1400 USFS#Wringer Canyon Allotment#01020#3712.46649125715 0.72 Acres Construction DisturbanceRNG 1400 USFS#Wringer Canyon Allotment#01020#3712.46649125715 0.21 Acres Operation DisturbanceRNG 1400 USFS#Wringer Canyon Allotment#01020#3712.46649125715 0.21 Acres Operation DisturbanceRNG 1410 BLM#BERYLLIUM#04400#11894.7256423466 0.34 Acres Construction DisturbanceRNG 1410 BLM#BERYLLIUM#04400#11894.7256423466 0.34 Acres Construction DisturbanceRNG 1410 BLM#BERYLLIUM#04400#11894.7256423466 0.13 Acres Operation DisturbanceRNG 1410 BLM#BERYLLIUM#04400#11894.7256423466 0.13 Acres Operation DisturbanceRNG 1410 BLM#DMAD#04343#1404.23076439892 3.76 Acres Construction DisturbanceRNG 1410 BLM#DMAD#04343#1404.23076439892 4.12 Acres Construction DisturbanceRNG 1410 BLM#DMAD#04343#1404.23076439892 1.07 Acres Operation DisturbanceRNG 1410 BLM#DMAD#04343#1404.23076439892 1.21 Acres Operation DisturbanceRNG 1410 BLM#GRABALT#04332#1157.42261169883 29.04 Acres Construction DisturbanceRNG 1410 BLM#GRABALT#04332#1157.42261169883 29.04 Acres Construction DisturbanceRNG 1410 BLM#GRABALT#04332#1157.42261169883 4.29 Acres Operation DisturbanceRNG 1410 BLM#GRABALT#04332#1157.42261169883 4.29 Acres Operation DisturbanceRNG 1410 BLM#HOLDEN WINTER#05784#38640.788100406 0.24 Acres Construction DisturbanceRNG 1410 BLM#HOLDEN WINTER#05784#38640.788100406 1.59 Acres Construction DisturbanceRNG 1410 BLM#HOLDEN WINTER#05784#38640.788100406 0.09 Acres Operation DisturbanceRNG 1410 BLM#HOLDEN WINTER#05784#38640.788100406 0.60 Acres Operation DisturbanceRNG 1410 BLM#OAK CITY#04406#34964.688662591 29.35 Acres Construction DisturbanceRNG 1410 BLM#OAK CITY#04406#34964.688662591 61.70 Acres Construction DisturbanceRNG 1410 BLM#OAK CITY#04406#34964.688662591 6.48 Acres Operation DisturbanceRNG 1410 BLM#OAK CITY#04406#34964.688662591 15.07 Acres Operation DisturbanceRNG 1410 BLM#RAILROAD#04344#588.431033578151 1.12 Acres Construction DisturbanceRNG 1410 BLM#RAILROAD#04344#588.431033578151 1.12 Acres Construction DisturbanceRNG 1410 BLM#RAILROAD#04344#588.431033578151 0.30 Acres Operation DisturbanceRNG 1410 BLM#RAILROAD#04344#588.431033578151 0.30 Acres Operation DisturbanceRNG 1410 BLM#SCIPIO PASS#05799#1374.58940066179 14.45 Acres Construction DisturbanceRNG 1410 BLM#SCIPIO PASS#05799#1374.58940066179 14.52 Acres Construction DisturbanceRNG 1410 BLM#SCIPIO PASS#05799#1374.58940066179 2.35 Acres Operation DisturbanceRNG 1410 BLM#SCIPIO PASS#05799#1374.58940066179 2.38 Acres Operation DisturbanceRNG 1410 BLM#SUGARVILLE#04409#62556.4385068636 36.60 Acres Construction DisturbanceRNG 1410 BLM#SUGARVILLE#04409#62556.4385068636 53.11 Acres Construction DisturbanceRNG 1410 BLM#SUGARVILLE#04409#62556.4385068636 9.57 Acres Operation DisturbanceRNG 1410 BLM#SUGARVILLE#04409#62556.4385068636 13.53 Acres Operation DisturbanceRNG 1410 BLM#SUMMIT#05769#760.221415725837 2.92 Acres Construction DisturbanceRNG 1410 BLM#SUMMIT#05769#760.221415725837 5.00 Acres Construction DisturbanceRNG 1410 BLM#SUMMIT#05769#760.221415725837 0.50 Acres Operation DisturbanceRNG 1410 BLM#SUMMIT#05769#760.221415725837 0.90 Acres Operation Disturbance

Page 192: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

RNG 1410 USFS#Scipio Allotment#01014#18613.0514608013 19.86 Acres Construction DisturbanceRNG 1410 USFS#Scipio Allotment#01014#18613.0514608013 28.53 Acres Construction DisturbanceRNG 1410 USFS#Scipio Allotment#01014#18613.0514608013 3.14 Acres Operation DisturbanceRNG 1410 USFS#Scipio Allotment#01014#18613.0514608013 4.51 Acres Operation DisturbanceRNG 1410 USFS#Whiskey Creek Allotment#01016#44891.1876628955 56.57 Acres Construction DisturbanceRNG 1410 USFS#Whiskey Creek Allotment#01016#44891.1876628955 103.04 Acres Construction DisturbanceRNG 1410 USFS#Whiskey Creek Allotment#01016#44891.1876628955 12.57 Acres Operation DisturbanceRNG 1410 USFS#Whiskey Creek Allotment#01016#44891.1876628955 20.36 Acres Operation DisturbanceRNG 1410 USFS#Wildgoose Allotment#01017#13510.1185022295 26.25 Acres Construction DisturbanceRNG 1410 USFS#Wildgoose Allotment#01017#13510.1185022295 26.30 Acres Construction DisturbanceRNG 1410 USFS#Wildgoose Allotment#01017#13510.1185022295 4.23 Acres Operation DisturbanceRNG 1410 USFS#Wildgoose Allotment#01017#13510.1185022295 4.23 Acres Operation DisturbanceRNG 1420 BLM#BERYLLIUM#04400#11894.7256423466 4.68 Acres Construction DisturbanceRNG 1420 BLM#BERYLLIUM#04400#11894.7256423466 28.93 Acres Construction DisturbanceRNG 1420 BLM#BERYLLIUM#04400#11894.7256423466 0.38 Acres Operation DisturbanceRNG 1420 BLM#BERYLLIUM#04400#11894.7256423466 2.80 Acres Operation DisturbanceRNG 1420 BLM#LYNNDYL#04405#14460.3553570242 4.20 Acres Construction DisturbanceRNG 1420 BLM#LYNNDYL#04405#14460.3553570242 5.81 Acres Construction DisturbanceRNG 1420 BLM#LYNNDYL#04405#14460.3553570242 1.54 Acres Operation DisturbanceRNG 1420 BLM#LYNNDYL#04405#14460.3553570242 1.96 Acres Operation DisturbanceRNG 1420 BLM#SUGARVILLE#04409#62556.4385068636 5.95 Acres Construction DisturbanceRNG 1420 BLM#SUGARVILLE#04409#62556.4385068636 55.18 Acres Construction DisturbanceRNG 1420 BLM#SUGARVILLE#04409#62556.4385068636 2.19 Acres Operation DisturbanceRNG 1420 BLM#SUGARVILLE#04409#62556.4385068636 8.28 Acres Operation DisturbanceRNG 1430 BLM#LYNNDYL#04405#14460.3553570242 24.55 Acres Construction DisturbanceRNG 1430 BLM#LYNNDYL#04405#14460.3553570242 24.78 Acres Construction DisturbanceRNG 1430 BLM#LYNNDYL#04405#14460.3553570242 4.92 Acres Operation DisturbanceRNG 1430 BLM#LYNNDYL#04405#14460.3553570242 4.97 Acres Operation DisturbanceRNG 1430 BLM#SMELTER MOUNTAIN#04408#74341.7723052077 63.53 Acres Construction DisturbanceRNG 1430 BLM#SMELTER MOUNTAIN#04408#74341.7723052077 71.40 Acres Construction DisturbanceRNG 1430 BLM#SMELTER MOUNTAIN#04408#74341.7723052077 12.69 Acres Operation DisturbanceRNG 1430 BLM#SMELTER MOUNTAIN#04408#74341.7723052077 14.30 Acres Operation DisturbanceRNG 1430 BLM#SUGARVILLE#04409#62556.4385068636 100.27 Acres Construction DisturbanceRNG 1430 BLM#SUGARVILLE#04409#62556.4385068636 125.96 Acres Construction DisturbanceRNG 1430 BLM#SUGARVILLE#04409#62556.4385068636 20.17 Acres Operation DisturbanceRNG 1430 BLM#SUGARVILLE#04409#62556.4385068636 25.33 Acres Operation DisturbanceRNG 1440 BLM#SMELTER MOUNTAIN#04408#74341.7723052077 18.25 Acres Construction DisturbanceRNG 1440 BLM#SMELTER MOUNTAIN#04408#74341.7723052077 22.49 Acres Construction DisturbanceRNG 1440 BLM#SMELTER MOUNTAIN#04408#74341.7723052077 1.40 Acres Operation DisturbanceRNG 1440 BLM#SMELTER MOUNTAIN#04408#74341.7723052077 1.77 Acres Operation DisturbanceRNG 1440 BLM#SUGARVILLE#04409#62556.4385068636 0.08 Acres Construction DisturbanceRNG 1440 BLM#SUGARVILLE#04409#62556.4385068636 31.23 Acres Construction DisturbanceRNG 1440 BLM#SUGARVILLE#04409#62556.4385068636 0.03 Acres Operation DisturbanceRNG 1440 BLM#SUGARVILLE#04409#62556.4385068636 4.44 Acres Operation DisturbanceRNG 1450 BLM#SMELTER MOUNTAIN#04408#74341.7723052077 91.33 Acres Construction Disturbance

Page 193: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

RNG 1450 BLM#SMELTER MOUNTAIN#04408#74341.7723052077 92.37 Acres Construction DisturbanceRNG 1450 BLM#SMELTER MOUNTAIN#04408#74341.7723052077 11.17 Acres Operation DisturbanceRNG 1450 BLM#SMELTER MOUNTAIN#04408#74341.7723052077 11.55 Acres Operation DisturbanceRNG 1460 BLM#CHALK KNOLLS#04401#51227.5556917445 101.12 Acres Construction DisturbanceRNG 1460 BLM#CHALK KNOLLS#04401#51227.5556917445 110.29 Acres Construction DisturbanceRNG 1460 BLM#CHALK KNOLLS#04401#51227.5556917445 12.82 Acres Operation DisturbanceRNG 1460 BLM#CHALK KNOLLS#04401#51227.5556917445 15.28 Acres Operation DisturbanceRNG 1460 BLM#CRICKETT#05779#101783.842634397 2.60 Acres Construction DisturbanceRNG 1460 BLM#CRICKETT#05779#101783.842634397 4.56 Acres Construction DisturbanceRNG 1460 BLM#CRICKETT#05779#101783.842634397 0.17 Acres Operation DisturbanceRNG 1460 BLM#CRICKETT#05779#101783.842634397 0.35 Acres Operation DisturbanceRNG 1460 BLM#DESERET#05775#317317.183529043 195.27 Acres Construction DisturbanceRNG 1460 BLM#DESERET#05775#317317.183529043 219.57 Acres Construction DisturbanceRNG 1460 BLM#DESERET#05775#317317.183529043 28.28 Acres Operation DisturbanceRNG 1460 BLM#DESERET#05775#317317.183529043 33.71 Acres Operation DisturbanceRNG 1460 BLM#SEELY#05787#51261.3083061847 49.64 Acres Construction DisturbanceRNG 1460 BLM#SEELY#05787#51261.3083061847 53.49 Acres Construction DisturbanceRNG 1460 BLM#SEELY#05787#51261.3083061847 10.84 Acres Operation DisturbanceRNG 1460 BLM#SEELY#05787#51261.3083061847 12.11 Acres Operation DisturbanceRNG 1460 BLM#SMELTER MOUNTAIN#04408#74341.7723052077 21.07 Acres Construction DisturbanceRNG 1460 BLM#SMELTER MOUNTAIN#04408#74341.7723052077 21.85 Acres Construction DisturbanceRNG 1460 BLM#SMELTER MOUNTAIN#04408#74341.7723052077 3.99 Acres Operation DisturbanceRNG 1460 BLM#SMELTER MOUNTAIN#04408#74341.7723052077 4.29 Acres Operation DisturbanceRNG 1470 BLM#CHALK KNOLLS#04401#51227.5556917445 92.71 Acres Construction DisturbanceRNG 1470 BLM#CHALK KNOLLS#04401#51227.5556917445 97.93 Acres Construction DisturbanceRNG 1470 BLM#CHALK KNOLLS#04401#51227.5556917445 19.66 Acres Operation DisturbanceRNG 1470 BLM#CHALK KNOLLS#04401#51227.5556917445 20.82 Acres Operation DisturbanceRNG 1470 BLM#CRICKETT#05779#101783.842634397 3.71 Acres Construction DisturbanceRNG 1470 BLM#CRICKETT#05779#101783.842634397 7.50 Acres Construction DisturbanceRNG 1470 BLM#CRICKETT#05779#101783.842634397 0.79 Acres Operation DisturbanceRNG 1470 BLM#CRICKETT#05779#101783.842634397 1.58 Acres Operation DisturbanceRNG 1470 BLM#DESERET#05775#317317.183529043 235.09 Acres Construction DisturbanceRNG 1470 BLM#DESERET#05775#317317.183529043 259.99 Acres Construction DisturbanceRNG 1470 BLM#DESERET#05775#317317.183529043 49.28 Acres Operation DisturbanceRNG 1470 BLM#DESERET#05775#317317.183529043 54.48 Acres Operation DisturbanceRNG 1470 BLM#LITTLE DRUM#04326#77438.90352849 0.86 Acres Construction DisturbanceRNG 1470 BLM#LITTLE DRUM#04326#77438.90352849 0.86 Acres Construction DisturbanceRNG 1470 BLM#LITTLE DRUM#04326#77438.90352849 0.20 Acres Operation DisturbanceRNG 1470 BLM#LITTLE DRUM#04326#77438.90352849 0.20 Acres Operation DisturbanceRNG 1470 BLM#SEELY#05787#51261.3083061847 66.72 Acres Construction DisturbanceRNG 1470 BLM#SEELY#05787#51261.3083061847 83.18 Acres Construction DisturbanceRNG 1470 BLM#SEELY#05787#51261.3083061847 13.93 Acres Operation DisturbanceRNG 1470 BLM#SEELY#05787#51261.3083061847 17.33 Acres Operation DisturbanceRNG 1470 BLM#SMELTER MOUNTAIN#04408#74341.7723052077 16.90 Acres Construction DisturbanceRNG 1470 BLM#SMELTER MOUNTAIN#04408#74341.7723052077 20.17 Acres Construction Disturbance

Page 194: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

RNG 1470 BLM#SMELTER MOUNTAIN#04408#74341.7723052077 3.60 Acres Operation DisturbanceRNG 1470 BLM#SMELTER MOUNTAIN#04408#74341.7723052077 4.32 Acres Operation DisturbanceRNG 1480 BLM#ANTELOPE PEAK#06205#57486.3908410357 0.00 Acres Construction DisturbanceRNG 1480 BLM#ANTELOPE PEAK#06205#57486.3908410357 0.00 Acres Construction DisturbanceRNG 1480 BLM#ANTELOPE PEAK#06205#57486.3908410357 0.00 Acres Operation DisturbanceRNG 1480 BLM#ANTELOPE PEAK#06205#57486.3908410357 0.00 Acres Operation DisturbanceRNG 1480 BLM#BEAVER LAKE#06215#71901.4326795621 18.78 Acres Construction DisturbanceRNG 1480 BLM#BEAVER LAKE#06215#71901.4326795621 20.58 Acres Construction DisturbanceRNG 1480 BLM#BEAVER LAKE#06215#71901.4326795621 3.65 Acres Operation DisturbanceRNG 1480 BLM#BEAVER LAKE#06215#71901.4326795621 4.33 Acres Operation DisturbanceRNG 1480 BLM#BURN KNOLL#06203#22249.3216156369 0.76 Acres Construction DisturbanceRNG 1480 BLM#BURN KNOLL#06203#22249.3216156369 0.76 Acres Construction DisturbanceRNG 1480 BLM#BURN KNOLL#06203#22249.3216156369 0.29 Acres Operation DisturbanceRNG 1480 BLM#BURN KNOLL#06203#22249.3216156369 0.29 Acres Operation DisturbanceRNG 1480 BLM#COOK#06201#52120.2460148132 124.80 Acres Construction DisturbanceRNG 1480 BLM#COOK#06201#52120.2460148132 167.57 Acres Construction DisturbanceRNG 1480 BLM#COOK#06201#52120.2460148132 23.47 Acres Operation DisturbanceRNG 1480 BLM#COOK#06201#52120.2460148132 29.18 Acres Operation DisturbanceRNG 1480 BLM#CRICKETT#05779#101783.842634397 267.08 Acres Construction DisturbanceRNG 1480 BLM#CRICKETT#05779#101783.842634397 269.21 Acres Construction DisturbanceRNG 1480 BLM#CRICKETT#05779#101783.842634397 42.32 Acres Operation DisturbanceRNG 1480 BLM#CRICKETT#05779#101783.842634397 43.12 Acres Operation DisturbanceRNG 1480 BLM#FRISCO#06212#65227.7347224667 53.65 Acres Construction DisturbanceRNG 1480 BLM#FRISCO#06212#65227.7347224667 71.80 Acres Construction DisturbanceRNG 1480 BLM#FRISCO#06212#65227.7347224667 9.81 Acres Operation DisturbanceRNG 1480 BLM#FRISCO#06212#65227.7347224667 13.15 Acres Operation DisturbanceRNG 1480 BLM#MILFORD CATTLE#06208#10722.2195125331 44.86 Acres Construction DisturbanceRNG 1480 BLM#MILFORD CATTLE#06208#10722.2195125331 48.68 Acres Construction DisturbanceRNG 1480 BLM#MILFORD CATTLE#06208#10722.2195125331 6.90 Acres Operation DisturbanceRNG 1480 BLM#MILFORD CATTLE#06208#10722.2195125331 7.24 Acres Operation DisturbanceRNG 1480 BLM#MINERSVILLE NO. 6#06106#20489.640085386 4.42 Acres Construction DisturbanceRNG 1480 BLM#MINERSVILLE NO. 6#06106#20489.640085386 24.14 Acres Construction DisturbanceRNG 1480 BLM#MINERSVILLE NO. 6#06106#20489.640085386 0.53 Acres Operation DisturbanceRNG 1480 BLM#MINERSVILLE NO. 6#06106#20489.640085386 3.40 Acres Operation DisturbanceRNG 1480 BLM#NADA#15048#42286.562013772 4.33 Acres Construction DisturbanceRNG 1480 BLM#NADA#15048#42286.562013772 29.76 Acres Construction DisturbanceRNG 1480 BLM#NADA#15048#42286.562013772 0.39 Acres Operation DisturbanceRNG 1480 BLM#NADA#15048#42286.562013772 3.36 Acres Operation DisturbanceRNG 1480 BLM#RED ROCK#06211#21601.1058270024 27.56 Acres Construction DisturbanceRNG 1480 BLM#RED ROCK#06211#21601.1058270024 35.80 Acres Construction DisturbanceRNG 1480 BLM#RED ROCK#06211#21601.1058270024 5.24 Acres Operation DisturbanceRNG 1480 BLM#RED ROCK#06211#21601.1058270024 6.46 Acres Operation DisturbanceRNG 1480 BLM#SHAUNTIE#06206#24124.5183258163 11.65 Acres Construction DisturbanceRNG 1480 BLM#SHAUNTIE#06206#24124.5183258163 17.58 Acres Construction DisturbanceRNG 1480 BLM#SHAUNTIE#06206#24124.5183258163 3.00 Acres Operation Disturbance

Page 195: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

RNG 1480 BLM#SHAUNTIE#06206#24124.5183258163 5.20 Acres Operation DisturbanceRNG 1480 BLM#SMITHSON#06209#29461.3587185544 36.81 Acres Construction DisturbanceRNG 1480 BLM#SMITHSON#06209#29461.3587185544 75.36 Acres Construction DisturbanceRNG 1480 BLM#SMITHSON#06209#29461.3587185544 6.23 Acres Operation DisturbanceRNG 1480 BLM#SMITHSON#06209#29461.3587185544 13.12 Acres Operation DisturbanceRNG 1480 BLM#TWIN PEAKS#05785#217773.880133312 0.06 Acres Construction DisturbanceRNG 1480 BLM#TWIN PEAKS#05785#217773.880133312 0.06 Acres Construction DisturbanceRNG 1480 BLM#TWIN PEAKS#05785#217773.880133312 0.01 Acres Operation DisturbanceRNG 1480 BLM#TWIN PEAKS#05785#217773.880133312 0.01 Acres Operation DisturbanceRNG 1480 BLM#WHEELER#05790#20220.4301717951 0.12 Acres Construction DisturbanceRNG 1480 BLM#WHEELER#05790#20220.4301717951 0.78 Acres Construction DisturbanceRNG 1480 BLM#WHEELER#05790#20220.4301717951 0.04 Acres Operation DisturbanceRNG 1480 BLM#WHEELER#05790#20220.4301717951 0.29 Acres Operation DisturbanceRNG 1490 BLM#BULLOCH#15016#27134.3553054917 40.67 Acres Construction DisturbanceRNG 1490 BLM#BULLOCH#15016#27134.3553054917 66.17 Acres Construction DisturbanceRNG 1490 BLM#BULLOCH#15016#27134.3553054917 8.33 Acres Operation DisturbanceRNG 1490 BLM#BULLOCH#15016#27134.3553054917 13.55 Acres Operation DisturbanceRNG 1490 BLM#NADA#15048#42286.562013772 15.93 Acres Construction DisturbanceRNG 1490 BLM#NADA#15048#42286.562013772 100.07 Acres Construction DisturbanceRNG 1490 BLM#NADA#15048#42286.562013772 3.26 Acres Operation DisturbanceRNG 1490 BLM#NADA#15048#42286.562013772 20.49 Acres Operation DisturbanceRNG 1490.05 BLM#BULLOCH#15016#27134.3553054917 1.23 Acres Construction DisturbanceRNG 1490.05 BLM#BULLOCH#15016#27134.3553054917 1.23 Acres Construction DisturbanceRNG 1490.05 BLM#BULLOCH#15016#27134.3553054917 0.24 Acres Operation DisturbanceRNG 1490.05 BLM#BULLOCH#15016#27134.3553054917 0.24 Acres Operation DisturbanceRNG 1490.05 BLM#BUTTE#15018#32258.4953074207 5.46 Acres Construction DisturbanceRNG 1490.05 BLM#BUTTE#15018#32258.4953074207 19.46 Acres Construction DisturbanceRNG 1490.05 BLM#BUTTE#15018#32258.4953074207 1.06 Acres Operation DisturbanceRNG 1490.05 BLM#BUTTE#15018#32258.4953074207 3.77 Acres Operation DisturbanceRNG 1490.05 BLM#DELVECCHIO#05124#4978.59851717175 16.42 Acres Construction DisturbanceRNG 1490.05 BLM#DELVECCHIO#05124#4978.59851717175 18.86 Acres Construction DisturbanceRNG 1490.05 BLM#DELVECCHIO#05124#4978.59851717175 3.17 Acres Operation DisturbanceRNG 1490.05 BLM#DELVECCHIO#05124#4978.59851717175 3.64 Acres Operation DisturbanceRNG 1490.05 BLM#GOLD SPRING#05127#38698.1546044294 30.30 Acres Construction DisturbanceRNG 1490.05 BLM#GOLD SPRING#05127#38698.1546044294 53.85 Acres Construction DisturbanceRNG 1490.05 BLM#GOLD SPRING#05127#38698.1546044294 5.85 Acres Operation DisturbanceRNG 1490.05 BLM#GOLD SPRING#05127#38698.1546044294 10.38 Acres Operation DisturbanceRNG 1490.05 BLM#GOVERNMENT WELL#05128#5633.3228052909 32.77 Acres Construction DisturbanceRNG 1490.05 BLM#GOVERNMENT WELL#05128#5633.3228052909 51.14 Acres Construction DisturbanceRNG 1490.05 BLM#GOVERNMENT WELL#05128#5633.3228052909 6.34 Acres Operation DisturbanceRNG 1490.05 BLM#GOVERNMENT WELL#05128#5633.3228052909 9.88 Acres Operation DisturbanceRNG 1490.05 BLM#JACKSON WASH#05133#42322.7827116753 39.30 Acres Construction DisturbanceRNG 1490.05 BLM#JACKSON WASH#05133#42322.7827116753 7.58 Acres Operation DisturbanceRNG 1490.05 BLM#LUND#05135#48335.2504342353 3.12 Acres Construction DisturbanceRNG 1490.05 BLM#LUND#05135#48335.2504342353 3.64 Acres Construction Disturbance

Page 196: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

RNG 1490.05 BLM#LUND#05135#48335.2504342353 0.61 Acres Operation DisturbanceRNG 1490.05 BLM#LUND#05135#48335.2504342353 0.72 Acres Operation DisturbanceRNG 1490.05 BLM#MCGUFFY SPRING#01043#22186.3250949659 0.12 Acres Construction DisturbanceRNG 1490.05 BLM#MCGUFFY SPRING#01043#22186.3250949659 0.12 Acres Construction DisturbanceRNG 1490.05 BLM#MCGUFFY SPRING#01043#22186.3250949659 0.03 Acres Operation DisturbanceRNG 1490.05 BLM#MCGUFFY SPRING#01043#22186.3250949659 0.03 Acres Operation DisturbanceRNG 1490.05 BLM#MODENA RESERVOIR#05139#5275.94528116041 0.74 Acres Construction DisturbanceRNG 1490.05 BLM#MODENA RESERVOIR#05139#5275.94528116041 0.15 Acres Operation DisturbanceRNG 1490.05 BLM#MODENA#05153#7379.46325421791 2.80 Acres Construction DisturbanceRNG 1490.05 BLM#MODENA#05153#7379.46325421791 34.45 Acres Construction DisturbanceRNG 1490.05 BLM#MODENA#05153#7379.46325421791 0.55 Acres Operation DisturbanceRNG 1490.05 BLM#MODENA#05153#7379.46325421791 6.64 Acres Operation DisturbanceRNG 1490.05 BLM#SOUTH OF RR TRACKS#05147#11672.2521282632 0.00 Acres Construction DisturbanceRNG 1490.05 BLM#SOUTH OF RR TRACKS#05147#11672.2521282632 31.33 Acres Construction DisturbanceRNG 1490.05 BLM#SOUTH OF RR TRACKS#05147#11672.2521282632 0.00 Acres Operation DisturbanceRNG 1490.05 BLM#SOUTH OF RR TRACKS#05147#11672.2521282632 6.12 Acres Operation DisturbanceRNG 1490.05 BLM#SUSC WINTER#05148#12497.5040119611 2.29 Acres Construction DisturbanceRNG 1490.05 BLM#SUSC WINTER#05148#12497.5040119611 2.91 Acres Construction DisturbanceRNG 1490.05 BLM#SUSC WINTER#05148#12497.5040119611 0.47 Acres Operation DisturbanceRNG 1490.05 BLM#SUSC WINTER#05148#12497.5040119611 0.60 Acres Operation DisturbanceRNG 1490.05 BLM#TILLY CREEK#02905#10717.8386541736 0.32 Acres Construction DisturbanceRNG 1490.05 BLM#TILLY CREEK#02905#10717.8386541736 0.06 Acres Operation DisturbanceRNG 1490.05 BLM#UVADA#01079#11247.0828336584 20.83 Acres Construction DisturbanceRNG 1490.05 BLM#UVADA#01079#11247.0828336584 20.83 Acres Construction DisturbanceRNG 1490.05 BLM#UVADA#01079#11247.0828336584 4.05 Acres Operation DisturbanceRNG 1490.05 BLM#UVADA#01079#11247.0828336584 4.05 Acres Operation DisturbanceRNG 1490.05 BLM#UVADA#05150#5436.85976175198 1.82 Acres Construction DisturbanceRNG 1490.05 BLM#UVADA#05150#5436.85976175198 3.94 Acres Construction DisturbanceRNG 1490.05 BLM#UVADA#05150#5436.85976175198 0.38 Acres Operation DisturbanceRNG 1490.05 BLM#UVADA#05150#5436.85976175198 0.82 Acres Operation DisturbanceRNG 1490.05 BLM#WOOD WEST#05152#9996.78207872786 0.00 Acres Construction DisturbanceRNG 1490.05 BLM#WOOD WEST#05152#9996.78207872786 18.07 Acres Construction DisturbanceRNG 1490.05 BLM#WOOD WEST#05152#9996.78207872786 0.00 Acres Operation DisturbanceRNG 1490.05 BLM#WOOD WEST#05152#9996.78207872786 3.49 Acres Operation DisturbanceRNG 1490.05 BLM#ZANE#15077#8611.85062859155 0.27 Acres Construction DisturbanceRNG 1490.05 BLM#ZANE#15077#8611.85062859155 20.72 Acres Construction DisturbanceRNG 1490.05 BLM#ZANE#15077#8611.85062859155 0.06 Acres Operation DisturbanceRNG 1490.05 BLM#ZANE#15077#8611.85062859155 4.05 Acres Operation DisturbanceRNG 1495 BLM#AVON#05135#5420.99474708871 15.29 Acres Construction DisturbanceRNG 1495 BLM#AVON#05135#5420.99474708871 35.57 Acres Construction DisturbanceRNG 1495 BLM#AVON#05135#5420.99474708871 2.85 Acres Operation DisturbanceRNG 1495 BLM#AVON#05135#5420.99474708871 6.61 Acres Operation DisturbanceRNG 1495 BLM#BULLOCH#15016#27134.3553054917 22.05 Acres Construction DisturbanceRNG 1495 BLM#BULLOCH#15016#27134.3553054917 40.71 Acres Construction DisturbanceRNG 1495 BLM#BULLOCH#15016#27134.3553054917 4.09 Acres Operation Disturbance

Page 197: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

RNG 1495 BLM#BULLOCH#15016#27134.3553054917 7.55 Acres Operation DisturbanceRNG 1495 BLM#BUTTE#15018#32258.4953074207 3.26 Acres Construction DisturbanceRNG 1495 BLM#BUTTE#15018#32258.4953074207 7.54 Acres Construction DisturbanceRNG 1495 BLM#BUTTE#15018#32258.4953074207 0.68 Acres Operation DisturbanceRNG 1495 BLM#BUTTE#15018#32258.4953074207 1.56 Acres Operation DisturbanceRNG 1495 BLM#DICK PALMER WASH#15021#16659.3164844034 1.24 Acres Construction DisturbanceRNG 1495 BLM#DICK PALMER WASH#15021#16659.3164844034 1.62 Acres Construction DisturbanceRNG 1495 BLM#DICK PALMER WASH#15021#16659.3164844034 0.26 Acres Operation DisturbanceRNG 1495 BLM#DICK PALMER WASH#15021#16659.3164844034 0.34 Acres Operation DisturbanceRNG 1495 BLM#LEIGH LIVESTOCK#15039#16554.8133155017 2.25 Acres Construction DisturbanceRNG 1495 BLM#LEIGH LIVESTOCK#15039#16554.8133155017 9.57 Acres Construction DisturbanceRNG 1495 BLM#LEIGH LIVESTOCK#15039#16554.8133155017 0.42 Acres Operation DisturbanceRNG 1495 BLM#LEIGH LIVESTOCK#15039#16554.8133155017 1.76 Acres Operation DisturbanceRNG 1495 BLM#LUND#05135#48335.2504342353 0.01 Acres Construction DisturbanceRNG 1495 BLM#LUND#05135#48335.2504342353 0.01 Acres Construction DisturbanceRNG 1495 BLM#LUND#05135#48335.2504342353 0.00 Acres Operation DisturbanceRNG 1495 BLM#LUND#05135#48335.2504342353 0.00 Acres Operation DisturbanceRNG 1500 BLM#AVON#05135#5420.99474708871 0.64 Acres Construction DisturbanceRNG 1500 BLM#AVON#05135#5420.99474708871 1.65 Acres Construction DisturbanceRNG 1500 BLM#AVON#05135#5420.99474708871 0.23 Acres Operation DisturbanceRNG 1500 BLM#AVON#05135#5420.99474708871 0.61 Acres Operation DisturbanceRNG 1500 BLM#BULLOCH#15016#27134.3553054917 0.00 Acres Construction DisturbanceRNG 1500 BLM#BULLOCH#15016#27134.3553054917 1.05 Acres Construction DisturbanceRNG 1500 BLM#BULLOCH#15016#27134.3553054917 0.00 Acres Operation DisturbanceRNG 1500 BLM#BULLOCH#15016#27134.3553054917 0.39 Acres Operation DisturbanceRNG 1500 BLM#DESERT#15020#14958.4557952888 28.47 Acres Construction DisturbanceRNG 1500 BLM#DESERT#15020#14958.4557952888 53.77 Acres Construction DisturbanceRNG 1500 BLM#DESERT#15020#14958.4557952888 4.87 Acres Operation DisturbanceRNG 1500 BLM#DESERT#15020#14958.4557952888 9.96 Acres Operation DisturbanceRNG 1500 BLM#LEIGH LIVESTOCK#15039#16554.8133155017 46.32 Acres Construction DisturbanceRNG 1500 BLM#LEIGH LIVESTOCK#15039#16554.8133155017 89.57 Acres Construction DisturbanceRNG 1500 BLM#LEIGH LIVESTOCK#15039#16554.8133155017 4.49 Acres Operation DisturbanceRNG 1500 BLM#LEIGH LIVESTOCK#15039#16554.8133155017 7.88 Acres Operation DisturbanceRNG 1500 BLM#NADA#15048#42286.562013772 18.61 Acres Construction DisturbanceRNG 1500 BLM#NADA#15048#42286.562013772 41.17 Acres Construction DisturbanceRNG 1500 BLM#NADA#15048#42286.562013772 2.82 Acres Operation DisturbanceRNG 1500 BLM#NADA#15048#42286.562013772 7.68 Acres Operation DisturbanceRNG 1500 BLM#NELSON#15050#1683.79676282515 0.45 Acres Construction DisturbanceRNG 1500 BLM#NELSON#15050#1683.79676282515 0.72 Acres Construction DisturbanceRNG 1500 BLM#NELSON#15050#1683.79676282515 0.17 Acres Operation DisturbanceRNG 1500 BLM#NELSON#15050#1683.79676282515 0.26 Acres Operation DisturbanceRNG 1500 BLM#NORTE WELL#15051#9783.16774534628 0.47 Acres Construction DisturbanceRNG 1500 BLM#NORTE WELL#15051#9783.16774534628 2.11 Acres Construction DisturbanceRNG 1500 BLM#NORTE WELL#15051#9783.16774534628 0.17 Acres Operation DisturbanceRNG 1500 BLM#NORTE WELL#15051#9783.16774534628 0.78 Acres Operation Disturbance

Page 198: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

RNG 1500 BLM#PERKINS#15055#3865.19885212243 26.30 Acres Construction DisturbanceRNG 1500 BLM#PERKINS#15055#3865.19885212243 32.17 Acres Construction DisturbanceRNG 1500 BLM#PERKINS#15055#3865.19885212243 3.11 Acres Operation DisturbanceRNG 1500 BLM#PERKINS#15055#3865.19885212243 4.17 Acres Operation DisturbanceRNG 1500.02 BLM#ANTELOPE SPRING#05011#6970.85608185993 0.93 Acres Construction DisturbanceRNG 1500.02 BLM#ANTELOPE SPRING#05011#6970.85608185993 1.22 Acres Construction DisturbanceRNG 1500.02 BLM#ANTELOPE SPRING#05011#6970.85608185993 0.34 Acres Operation DisturbanceRNG 1500.02 BLM#ANTELOPE SPRING#05011#6970.85608185993 0.44 Acres Operation DisturbanceRNG 1500.02 BLM#ANTELOPE#05010#2032.38638145294 1.04 Acres Construction DisturbanceRNG 1500.02 BLM#ANTELOPE#05010#2032.38638145294 13.84 Acres Construction DisturbanceRNG 1500.02 BLM#ANTELOPE#05010#2032.38638145294 0.38 Acres Operation DisturbanceRNG 1500.02 BLM#ANTELOPE#05010#2032.38638145294 2.06 Acres Operation DisturbanceRNG 1500.02 BLM#BUTTE#15018#32258.4953074207 22.16 Acres Construction DisturbanceRNG 1500.02 BLM#BUTTE#15018#32258.4953074207 3.13 Acres Operation DisturbanceRNG 1500.02 BLM#DICK PALMER WASH#15021#16659.3164844034 11.39 Acres Construction DisturbanceRNG 1500.02 BLM#DICK PALMER WASH#15021#16659.3164844034 77.41 Acres Construction DisturbanceRNG 1500.02 BLM#DICK PALMER WASH#15021#16659.3164844034 1.92 Acres Operation DisturbanceRNG 1500.02 BLM#DICK PALMER WASH#15021#16659.3164844034 10.99 Acres Operation DisturbanceRNG 1500.02 BLM#LEIGH LIVESTOCK#15039#16554.8133155017 0.21 Acres Construction DisturbanceRNG 1500.02 BLM#LEIGH LIVESTOCK#15039#16554.8133155017 2.46 Acres Construction DisturbanceRNG 1500.02 BLM#LEIGH LIVESTOCK#15039#16554.8133155017 0.08 Acres Operation DisturbanceRNG 1500.02 BLM#LEIGH LIVESTOCK#15039#16554.8133155017 0.50 Acres Operation DisturbanceRNG 1500.02 BLM#RESERVOIR#15060#4951.51551493693 1.30 Acres Construction DisturbanceRNG 1500.02 BLM#RESERVOIR#15060#4951.51551493693 1.49 Acres Construction DisturbanceRNG 1500.02 BLM#RESERVOIR#15060#4951.51551493693 0.17 Acres Operation DisturbanceRNG 1500.02 BLM#RESERVOIR#15060#4951.51551493693 0.21 Acres Operation DisturbanceRNG 1500.02 BLM#SAND SPRING#15064#6705.48213939159 3.12 Acres Construction DisturbanceRNG 1500.02 BLM#SAND SPRING#15064#6705.48213939159 34.91 Acres Construction DisturbanceRNG 1500.02 BLM#SAND SPRING#15064#6705.48213939159 0.99 Acres Operation DisturbanceRNG 1500.02 BLM#SAND SPRING#15064#6705.48213939159 4.34 Acres Operation DisturbanceRNG 1500.02 BLM#SILVER PEAK#15067#4960.54175388228 11.90 Acres Construction DisturbanceRNG 1500.02 BLM#SILVER PEAK#15067#4960.54175388228 21.76 Acres Construction DisturbanceRNG 1500.02 BLM#SILVER PEAK#15067#4960.54175388228 1.54 Acres Operation DisturbanceRNG 1500.02 BLM#SILVER PEAK#15067#4960.54175388228 2.90 Acres Operation DisturbanceRNG 1500.05 BLM#PINTO CREEK#15057#2617.81357835131 29.12 Acres Construction DisturbanceRNG 1500.05 BLM#PINTO CREEK#15057#2617.81357835131 32.37 Acres Construction DisturbanceRNG 1500.05 BLM#PINTO CREEK#15057#2617.81357835131 8.60 Acres Operation DisturbanceRNG 1500.05 BLM#PINTO CREEK#15057#2617.81357835131 9.62 Acres Operation DisturbanceRNG 1500.05 BLM#RESERVOIR#15060#4951.51551493693 11.40 Acres Construction DisturbanceRNG 1500.05 BLM#RESERVOIR#15060#4951.51551493693 17.08 Acres Construction DisturbanceRNG 1500.05 BLM#RESERVOIR#15060#4951.51551493693 2.92 Acres Operation DisturbanceRNG 1500.05 BLM#RESERVOIR#15060#4951.51551493693 5.06 Acres Operation DisturbanceRNG 1500.05 BLM#SEVY EAST#15065#553.333097472124 10.19 Acres Construction DisturbanceRNG 1500.05 BLM#SEVY EAST#15065#553.333097472124 12.65 Acres Construction DisturbanceRNG 1500.05 BLM#SEVY EAST#15065#553.333097472124 1.99 Acres Operation Disturbance

Page 199: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

RNG 1500.05 BLM#SEVY EAST#15065#553.333097472124 3.06 Acres Operation DisturbanceRNG 1500.05 USFS#Gunlock#00106#42140.2206730586 0.01 Acres Construction DisturbanceRNG 1500.05 USFS#Gunlock#00106#42140.2206730586 0.00 Acres Operation DisturbanceRNG 1500.05 USFS#West Pinto#00113#29424.9407682309 25.40 Acres Construction DisturbanceRNG 1500.05 USFS#West Pinto#00113#29424.9407682309 25.47 Acres Construction DisturbanceRNG 1500.05 USFS#West Pinto#00113#29424.9407682309 5.07 Acres Operation DisturbanceRNG 1500.05 USFS#West Pinto#00113#29424.9407682309 5.09 Acres Operation DisturbanceRNG 1501.1 BLM#SCARECROW PEAK#14048#78610.3583636018 0.23 Acres Construction DisturbanceRNG 1501.1 BLM#SCARECROW PEAK#14048#78610.3583636018 0.24 Acres Construction DisturbanceRNG 1501.1 BLM#SCARECROW PEAK#14048#78610.3583636018 0.02 Acres Operation DisturbanceRNG 1501.1 BLM#SCARECROW PEAK#14048#78610.3583636018 0.02 Acres Operation DisturbanceRNG 1501.1 USFS# # #193382.412824016 0.06 Acres Construction DisturbanceRNG 1501.1 USFS# # #193382.412824016 0.06 Acres Construction DisturbanceRNG 1501.1 USFS# # #193382.412824016 0.04 Acres Operation DisturbanceRNG 1501.1 USFS# # #193382.412824016 0.04 Acres Operation DisturbanceRNG 1501.1 USFS#Gunlock#00106#42140.2206730586 4.02 Acres Construction DisturbanceRNG 1501.1 USFS#Gunlock#00106#42140.2206730586 4.07 Acres Construction DisturbanceRNG 1501.1 USFS#Gunlock#00106#42140.2206730586 1.44 Acres Operation DisturbanceRNG 1501.1 USFS#Gunlock#00106#42140.2206730586 1.47 Acres Operation DisturbanceRNG 1501.1 USFS#Magotsu#00108#34503.1608048968 145.19 Acres Construction DisturbanceRNG 1501.1 USFS#Magotsu#00108#34503.1608048968 171.35 Acres Construction DisturbanceRNG 1501.1 USFS#Magotsu#00108#34503.1608048968 35.72 Acres Operation DisturbanceRNG 1501.1 USFS#Magotsu#00108#34503.1608048968 47.33 Acres Operation DisturbanceRNG 1501.1 USFS#West Pinto#00113#29424.9407682309 66.02 Acres Construction DisturbanceRNG 1501.1 USFS#West Pinto#00113#29424.9407682309 76.76 Acres Construction DisturbanceRNG 1501.1 USFS#West Pinto#00113#29424.9407682309 17.42 Acres Operation DisturbanceRNG 1501.1 USFS#West Pinto#00113#29424.9407682309 23.22 Acres Operation DisturbanceRNG 1501.15 BLM#MAGOTSU#14065#2911.72488973812 0.54 Acres Construction DisturbanceRNG 1501.15 BLM#MAGOTSU#14065#2911.72488973812 0.55 Acres Construction DisturbanceRNG 1501.15 BLM#MAGOTSU#14065#2911.72488973812 0.21 Acres Operation DisturbanceRNG 1501.15 BLM#MAGOTSU#14065#2911.72488973812 0.21 Acres Operation DisturbanceRNG 1501.15 BLM#SCARECROW PEAK#14048#78610.3583636018 0.48 Acres Construction DisturbanceRNG 1501.15 BLM#SCARECROW PEAK#14048#78610.3583636018 0.48 Acres Construction DisturbanceRNG 1501.15 BLM#SCARECROW PEAK#14048#78610.3583636018 0.29 Acres Operation DisturbanceRNG 1501.15 BLM#SCARECROW PEAK#14048#78610.3583636018 0.29 Acres Operation DisturbanceRNG 1501.15 USFS#Gunlock#00106#42140.2206730586 15.22 Acres Construction DisturbanceRNG 1501.15 USFS#Gunlock#00106#42140.2206730586 15.22 Acres Construction DisturbanceRNG 1501.15 USFS#Gunlock#00106#42140.2206730586 3.32 Acres Operation DisturbanceRNG 1501.15 USFS#Gunlock#00106#42140.2206730586 3.32 Acres Operation DisturbanceRNG 1501.15 USFS#Magotsu#00108#34503.1608048968 4.15 Acres Construction DisturbanceRNG 1501.15 USFS#Magotsu#00108#34503.1608048968 4.15 Acres Construction DisturbanceRNG 1501.15 USFS#Magotsu#00108#34503.1608048968 0.68 Acres Operation DisturbanceRNG 1501.15 USFS#Magotsu#00108#34503.1608048968 0.68 Acres Operation DisturbanceRNG 1502.5 BLM#BEACON#01076#6498.33322409001 20.60 Acres Construction DisturbanceRNG 1502.5 BLM#BEACON#01076#6498.33322409001 19.61 Acres Construction Disturbance

Page 200: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

RNG 1502.5 BLM#BEACON#01076#6498.33322409001 7.63 Acres Operation DisturbanceRNG 1502.5 BLM#BEACON#01076#6498.33322409001 7.10 Acres Operation DisturbanceRNG 1502.5 BLM#BEAVER DAM SLOPE#14004#61274.8945795451 5.98 Acres Construction DisturbanceRNG 1502.5 BLM#BEAVER DAM SLOPE#14004#61274.8945795451 14.62 Acres Construction DisturbanceRNG 1502.5 BLM#BEAVER DAM SLOPE#14004#61274.8945795451 3.33 Acres Operation DisturbanceRNG 1502.5 BLM#BEAVER DAM SLOPE#14004#61274.8945795451 5.47 Acres Operation DisturbanceRNG 1502.5 BLM#DESERT INN#14018#39278.881197319 14.56 Acres Construction DisturbanceRNG 1502.5 BLM#DESERT INN#14018#39278.881197319 13.98 Acres Construction DisturbanceRNG 1502.5 BLM#DESERT INN#14018#39278.881197319 5.24 Acres Operation DisturbanceRNG 1502.5 BLM#DESERT INN#14018#39278.881197319 4.94 Acres Operation DisturbanceRNG 1502.5 BLM#GOURD SPRING#01071#97599.0929926493 9.45 Acres Construction DisturbanceRNG 1502.5 BLM#GOURD SPRING#01071#97599.0929926493 9.01 Acres Construction DisturbanceRNG 1502.5 BLM#GOURD SPRING#01071#97599.0929926493 3.45 Acres Operation DisturbanceRNG 1502.5 BLM#GOURD SPRING#01071#97599.0929926493 3.21 Acres Operation DisturbanceRNG 1502.5 BLM#JACKSON WASH#14030#33395.705072038 86.53 Acres Construction DisturbanceRNG 1502.5 BLM#JACKSON WASH#14030#33395.705072038 99.25 Acres Construction DisturbanceRNG 1502.5 BLM#JACKSON WASH#14030#33395.705072038 22.62 Acres Operation DisturbanceRNG 1502.5 BLM#JACKSON WASH#14030#33395.705072038 24.55 Acres Operation DisturbanceRNG 1502.5 BLM#MAGOTSU#14065#2911.72488973812 10.94 Acres Construction DisturbanceRNG 1502.5 BLM#MAGOTSU#14065#2911.72488973812 11.69 Acres Construction DisturbanceRNG 1502.5 BLM#MAGOTSU#14065#2911.72488973812 1.39 Acres Operation DisturbanceRNG 1502.5 BLM#MAGOTSU#14065#2911.72488973812 1.48 Acres Operation DisturbanceRNG 1502.5 BLM#MINERA WASH#14036#3775.38631106162 35.32 Acres Construction DisturbanceRNG 1502.5 BLM#MINERA WASH#14036#3775.38631106162 34.18 Acres Construction DisturbanceRNG 1502.5 BLM#MINERA WASH#14036#3775.38631106162 8.85 Acres Operation DisturbanceRNG 1502.5 BLM#MINERA WASH#14036#3775.38631106162 8.30 Acres Operation DisturbanceRNG 1502.5 BLM#SAND HOLLOW#01064#34570.8602454936 24.69 Acres Construction DisturbanceRNG 1502.5 BLM#SAND HOLLOW#01064#34570.8602454936 23.19 Acres Construction DisturbanceRNG 1502.5 BLM#SAND HOLLOW#01064#34570.8602454936 11.52 Acres Operation DisturbanceRNG 1502.5 BLM#SAND HOLLOW#01064#34570.8602454936 10.69 Acres Operation DisturbanceRNG 1502.5 BLM#SCARECROW PEAK#14048#78610.3583636018 197.45 Acres Construction DisturbanceRNG 1502.5 BLM#SCARECROW PEAK#14048#78610.3583636018 211.89 Acres Construction DisturbanceRNG 1502.5 BLM#SCARECROW PEAK#14048#78610.3583636018 59.13 Acres Operation DisturbanceRNG 1502.5 BLM#SCARECROW PEAK#14048#78610.3583636018 60.46 Acres Operation DisturbanceRNG 1502.5 BLM#SNOW SPRINGS#01074#44394.1117869375 0.71 Acres Construction DisturbanceRNG 1502.5 BLM#SNOW SPRINGS#01074#44394.1117869375 0.66 Acres Construction DisturbanceRNG 1502.5 BLM#SNOW SPRINGS#01074#44394.1117869375 0.40 Acres Operation DisturbanceRNG 1502.5 BLM#SNOW SPRINGS#01074#44394.1117869375 0.37 Acres Operation DisturbanceRNG 1502.5 BLM#TWIN PEAKS#14054#32654.2285923708 90.89 Acres Construction DisturbanceRNG 1502.5 BLM#TWIN PEAKS#14054#32654.2285923708 87.77 Acres Construction DisturbanceRNG 1502.5 BLM#TWIN PEAKS#14054#32654.2285923708 24.22 Acres Operation DisturbanceRNG 1502.5 BLM#TWIN PEAKS#14054#32654.2285923708 22.69 Acres Operation DisturbanceRNG 1502.5 USFS#Bull Valley#00102#37865.6644250275 2.15 Acres Construction DisturbanceRNG 1502.5 USFS#Bull Valley#00102#37865.6644250275 2.04 Acres Construction DisturbanceRNG 1502.5 USFS#Bull Valley#00102#37865.6644250275 0.87 Acres Operation Disturbance

Page 201: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

RNG 1502.5 USFS#Bull Valley#00102#37865.6644250275 0.81 Acres Operation DisturbanceRNG 1502.5 USFS#Gunlock#00106#42140.2206730586 46.92 Acres Construction DisturbanceRNG 1502.5 USFS#Gunlock#00106#42140.2206730586 46.18 Acres Construction DisturbanceRNG 1502.5 USFS#Gunlock#00106#42140.2206730586 6.14 Acres Operation DisturbanceRNG 1502.5 USFS#Gunlock#00106#42140.2206730586 5.88 Acres Operation DisturbanceRNG 1503 USFS#Gunlock#00106#42140.2206730586 107.29 Acres Construction DisturbanceRNG 1503 USFS#Gunlock#00106#42140.2206730586 112.20 Acres Construction DisturbanceRNG 1503 USFS#Gunlock#00106#42140.2206730586 29.27 Acres Operation DisturbanceRNG 1503 USFS#Gunlock#00106#42140.2206730586 31.17 Acres Operation DisturbanceRNG 1503 USFS#West Pinto#00113#29424.9407682309 2.63 Acres Construction DisturbanceRNG 1503 USFS#West Pinto#00113#29424.9407682309 2.63 Acres Construction DisturbanceRNG 1503 USFS#West Pinto#00113#29424.9407682309 1.17 Acres Operation DisturbanceRNG 1503 USFS#West Pinto#00113#29424.9407682309 1.17 Acres Operation DisturbanceRNG 1503.5 USFS#West Pinto#00113#29424.9407682309 13.90 Acres Construction DisturbanceRNG 1503.5 USFS#West Pinto#00113#29424.9407682309 13.90 Acres Construction DisturbanceRNG 1503.5 USFS#West Pinto#00113#29424.9407682309 1.93 Acres Operation DisturbanceRNG 1503.5 USFS#West Pinto#00113#29424.9407682309 1.93 Acres Operation DisturbanceRNG 1504 USFS#Gunlock#00106#42140.2206730586 91.89 Acres Construction DisturbanceRNG 1504 USFS#Gunlock#00106#42140.2206730586 96.65 Acres Construction DisturbanceRNG 1504 USFS#Gunlock#00106#42140.2206730586 28.67 Acres Operation DisturbanceRNG 1504 USFS#Gunlock#00106#42140.2206730586 30.36 Acres Operation DisturbanceRNG 1504 USFS#West Pinto#00113#29424.9407682309 8.39 Acres Construction DisturbanceRNG 1504 USFS#West Pinto#00113#29424.9407682309 9.64 Acres Construction DisturbanceRNG 1504 USFS#West Pinto#00113#29424.9407682309 2.75 Acres Operation DisturbanceRNG 1504 USFS#West Pinto#00113#29424.9407682309 3.30 Acres Operation DisturbanceRNG 1505 USFS#Gunlock#00106#42140.2206730586 179.19 Acres Construction DisturbanceRNG 1505 USFS#Gunlock#00106#42140.2206730586 190.49 Acres Construction DisturbanceRNG 1505 USFS#Gunlock#00106#42140.2206730586 66.04 Acres Operation DisturbanceRNG 1505 USFS#Gunlock#00106#42140.2206730586 73.57 Acres Operation DisturbanceRNG 1506 BLM#CENTRAL#14011#3165.5593513135 3.09 Acres Construction DisturbanceRNG 1506 BLM#CENTRAL#14011#3165.5593513135 3.22 Acres Construction DisturbanceRNG 1506 BLM#CENTRAL#14011#3165.5593513135 1.42 Acres Operation DisturbanceRNG 1506 BLM#CENTRAL#14011#3165.5593513135 1.48 Acres Operation DisturbanceRNG 1506 BLM#LOWER MEADOW#15044#1966.3523144271 5.45 Acres Construction DisturbanceRNG 1506 BLM#LOWER MEADOW#15044#1966.3523144271 9.51 Acres Construction DisturbanceRNG 1506 BLM#LOWER MEADOW#15044#1966.3523144271 1.59 Acres Operation DisturbanceRNG 1506 BLM#LOWER MEADOW#15044#1966.3523144271 3.17 Acres Operation DisturbanceRNG 1506 BLM#RESERVOIR#15060#4951.51551493693 21.06 Acres Construction DisturbanceRNG 1506 BLM#RESERVOIR#15060#4951.51551493693 24.15 Acres Construction DisturbanceRNG 1506 BLM#RESERVOIR#15060#4951.51551493693 6.86 Acres Operation DisturbanceRNG 1506 BLM#RESERVOIR#15060#4951.51551493693 8.20 Acres Operation DisturbanceRNG 1506 BLM#SCARECROW PEAK#14048#78610.3583636018 12.14 Acres Construction DisturbanceRNG 1506 BLM#SCARECROW PEAK#14048#78610.3583636018 16.26 Acres Construction DisturbanceRNG 1506 BLM#SCARECROW PEAK#14048#78610.3583636018 2.84 Acres Operation DisturbanceRNG 1506 BLM#SCARECROW PEAK#14048#78610.3583636018 3.68 Acres Operation Disturbance

Page 202: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

RNG 1506 BLM#SILVER PEAK#15067#4960.54175388228 0.01 Acres Construction DisturbanceRNG 1506 BLM#SILVER PEAK#15067#4960.54175388228 0.01 Acres Construction DisturbanceRNG 1506 BLM#SILVER PEAK#15067#4960.54175388228 0.01 Acres Operation DisturbanceRNG 1506 BLM#SILVER PEAK#15067#4960.54175388228 0.01 Acres Operation DisturbanceRNG 1506 USFS# # #193382.412824016 2.57 Acres Construction DisturbanceRNG 1506 USFS# # #193382.412824016 2.57 Acres Construction DisturbanceRNG 1506 USFS# # #193382.412824016 1.19 Acres Operation DisturbanceRNG 1506 USFS# # #193382.412824016 1.19 Acres Operation DisturbanceRNG 1506 USFS#East Pinto#00104#16767.9010908653 34.77 Acres Construction DisturbanceRNG 1506 USFS#East Pinto#00104#16767.9010908653 57.40 Acres Construction DisturbanceRNG 1506 USFS#East Pinto#00104#16767.9010908653 10.19 Acres Operation DisturbanceRNG 1506 USFS#East Pinto#00104#16767.9010908653 14.53 Acres Operation DisturbanceRNG 1506 USFS#Iron Town#00107#17495.6608401331 2.34 Acres Construction DisturbanceRNG 1506 USFS#Iron Town#00107#17495.6608401331 2.35 Acres Construction DisturbanceRNG 1506 USFS#Iron Town#00107#17495.6608401331 1.09 Acres Operation DisturbanceRNG 1506 USFS#Iron Town#00107#17495.6608401331 1.09 Acres Operation DisturbanceRNG 1506 USFS#Magotsu#00108#34503.1608048968 19.93 Acres Construction DisturbanceRNG 1506 USFS#Magotsu#00108#34503.1608048968 19.93 Acres Construction DisturbanceRNG 1506 USFS#Magotsu#00108#34503.1608048968 5.79 Acres Operation DisturbanceRNG 1506 USFS#Magotsu#00108#34503.1608048968 5.79 Acres Operation DisturbanceRNG 1506 USFS#Pine Valley#00110#63589.1675822444 209.05 Acres Construction DisturbanceRNG 1506 USFS#Pine Valley#00110#63589.1675822444 230.92 Acres Construction DisturbanceRNG 1506 USFS#Pine Valley#00110#63589.1675822444 47.38 Acres Operation DisturbanceRNG 1506 USFS#Pine Valley#00110#63589.1675822444 52.20 Acres Operation DisturbanceRNG 1506 USFS#West Pinto#00113#29424.9407682309 30.04 Acres Construction DisturbanceRNG 1506 USFS#West Pinto#00113#29424.9407682309 47.81 Acres Construction DisturbanceRNG 1506 USFS#West Pinto#00113#29424.9407682309 8.05 Acres Operation DisturbanceRNG 1506 USFS#West Pinto#00113#29424.9407682309 11.85 Acres Operation DisturbanceRNG 1510 BLM#BARCLAY#11004#82019.4239761344 145.65 Acres Construction DisturbanceRNG 1510 BLM#BARCLAY#11004#82019.4239761344 152.27 Acres Construction DisturbanceRNG 1510 BLM#BARCLAY#11004#82019.4239761344 34.83 Acres Operation DisturbanceRNG 1510 BLM#BARCLAY#11004#82019.4239761344 36.18 Acres Operation DisturbanceRNG 1510 BLM#BEACON#01076#6498.33322409001 2.16 Acres Construction DisturbanceRNG 1510 BLM#BEACON#01076#6498.33322409001 2.16 Acres Construction DisturbanceRNG 1510 BLM#BEACON#01076#6498.33322409001 0.90 Acres Operation DisturbanceRNG 1510 BLM#BEACON#01076#6498.33322409001 0.90 Acres Operation DisturbanceRNG 1510 BLM#CRESTLINE#11023#3662.29870347508 27.84 Acres Construction DisturbanceRNG 1510 BLM#CRESTLINE#11023#3662.29870347508 34.26 Acres Construction DisturbanceRNG 1510 BLM#CRESTLINE#11023#3662.29870347508 6.50 Acres Operation DisturbanceRNG 1510 BLM#CRESTLINE#11023#3662.29870347508 7.97 Acres Operation DisturbanceRNG 1510 BLM#CROSSROADS#21024#19743.3176041594 82.69 Acres Construction DisturbanceRNG 1510 BLM#CROSSROADS#21024#19743.3176041594 85.09 Acres Construction DisturbanceRNG 1510 BLM#CROSSROADS#21024#19743.3176041594 19.22 Acres Operation DisturbanceRNG 1510 BLM#CROSSROADS#21024#19743.3176041594 19.91 Acres Operation DisturbanceRNG 1510 BLM#ENTERPRISE#11031#21159.0479078258 64.28 Acres Construction Disturbance

Page 203: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

RNG 1510 BLM#ENTERPRISE#11031#21159.0479078258 66.53 Acres Construction DisturbanceRNG 1510 BLM#ENTERPRISE#11031#21159.0479078258 15.46 Acres Operation DisturbanceRNG 1510 BLM#ENTERPRISE#11031#21159.0479078258 16.13 Acres Operation DisturbanceRNG 1510 BLM#GARDEN SPRING#01065#39234.3876799914 78.56 Acres Construction DisturbanceRNG 1510 BLM#GARDEN SPRING#01065#39234.3876799914 78.94 Acres Construction DisturbanceRNG 1510 BLM#GARDEN SPRING#01065#39234.3876799914 23.01 Acres Operation DisturbanceRNG 1510 BLM#GARDEN SPRING#01065#39234.3876799914 23.06 Acres Operation DisturbanceRNG 1510 BLM#GOURD SPRING#01071#97599.0929926493 24.17 Acres Construction DisturbanceRNG 1510 BLM#GOURD SPRING#01071#97599.0929926493 24.22 Acres Construction DisturbanceRNG 1510 BLM#GOURD SPRING#01071#97599.0929926493 8.12 Acres Operation DisturbanceRNG 1510 BLM#GOURD SPRING#01071#97599.0929926493 8.12 Acres Operation DisturbanceRNG 1510 BLM#HAYPRESS#11033#8063.55200939105 47.84 Acres Construction DisturbanceRNG 1510 BLM#HAYPRESS#11033#8063.55200939105 49.31 Acres Construction DisturbanceRNG 1510 BLM#HAYPRESS#11033#8063.55200939105 12.20 Acres Operation DisturbanceRNG 1510 BLM#HAYPRESS#11033#8063.55200939105 12.73 Acres Operation DisturbanceRNG 1510 BLM#LIME MOUNTAIN#21005#62620.8158871761 88.93 Acres Construction DisturbanceRNG 1510 BLM#LIME MOUNTAIN#21005#62620.8158871761 89.68 Acres Construction DisturbanceRNG 1510 BLM#LIME MOUNTAIN#21005#62620.8158871761 20.36 Acres Operation DisturbanceRNG 1510 BLM#LIME MOUNTAIN#21005#62620.8158871761 20.49 Acres Operation DisturbanceRNG 1510 BLM#OAK WELLS#01051#30109.7938301 14.25 Acres Construction DisturbanceRNG 1510 BLM#OAK WELLS#01051#30109.7938301 14.36 Acres Construction DisturbanceRNG 1510 BLM#OAK WELLS#01051#30109.7938301 3.55 Acres Operation DisturbanceRNG 1510 BLM#OAK WELLS#01051#30109.7938301 3.56 Acres Operation DisturbanceRNG 1510 BLM#SHEEP FLAT#01069#74216.1969594907 111.37 Acres Construction DisturbanceRNG 1510 BLM#SHEEP FLAT#01069#74216.1969594907 112.31 Acres Construction DisturbanceRNG 1510 BLM#SHEEP FLAT#01069#74216.1969594907 25.65 Acres Operation DisturbanceRNG 1510 BLM#SHEEP FLAT#01069#74216.1969594907 25.81 Acres Operation DisturbanceRNG 1510 BLM#SNOW SPRINGS#01074#44394.1117869375 9.23 Acres Construction DisturbanceRNG 1510 BLM#SNOW SPRINGS#01074#44394.1117869375 9.23 Acres Construction DisturbanceRNG 1510 BLM#SNOW SPRINGS#01074#44394.1117869375 3.52 Acres Operation DisturbanceRNG 1510 BLM#SNOW SPRINGS#01074#44394.1117869375 3.51 Acres Operation DisturbanceRNG 1510 BLM#SUMMIT SPRING#01077#17630.9580338548 44.70 Acres Construction DisturbanceRNG 1510 BLM#SUMMIT SPRING#01077#17630.9580338548 46.00 Acres Construction DisturbanceRNG 1510 BLM#SUMMIT SPRING#01077#17630.9580338548 14.33 Acres Operation DisturbanceRNG 1510 BLM#SUMMIT SPRING#01077#17630.9580338548 14.83 Acres Operation DisturbanceRNG 1510 BLM#UVADA#01079#11247.0828336584 34.28 Acres Construction DisturbanceRNG 1510 BLM#UVADA#01079#11247.0828336584 34.51 Acres Construction DisturbanceRNG 1510 BLM#UVADA#01079#11247.0828336584 8.82 Acres Operation DisturbanceRNG 1510 BLM#UVADA#01079#11247.0828336584 8.86 Acres Operation DisturbanceRNG 1510 BLM#UVADA#05150#5436.85976175198 0.10 Acres Construction DisturbanceRNG 1510 BLM#UVADA#05150#5436.85976175198 0.59 Acres Construction DisturbanceRNG 1510 BLM#UVADA#05150#5436.85976175198 0.04 Acres Operation DisturbanceRNG 1510 BLM#UVADA#05150#5436.85976175198 0.25 Acres Operation DisturbanceRNG 1520 BLM#ARROW CANYON#02002#115219.584025552 235.65 Acres Construction DisturbanceRNG 1520 BLM#ARROW CANYON#02002#115219.584025552 275.97 Acres Construction Disturbance

Page 204: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

RNG 1520 BLM#ARROW CANYON#02002#115219.584025552 41.32 Acres Operation DisturbanceRNG 1520 BLM#ARROW CANYON#02002#115219.584025552 59.55 Acres Operation DisturbanceRNG 1520 BLM#BENNETT SPRING#21006#48915.634230424 80.03 Acres Construction DisturbanceRNG 1520 BLM#BENNETT SPRING#21006#48915.634230424 79.75 Acres Construction DisturbanceRNG 1520 BLM#BENNETT SPRING#21006#48915.634230424 16.02 Acres Operation DisturbanceRNG 1520 BLM#BENNETT SPRING#21006#48915.634230424 15.98 Acres Operation DisturbanceRNG 1520 BLM#BUCKBOARD SPRING#21011#10694.7800226145 47.78 Acres Construction DisturbanceRNG 1520 BLM#BUCKBOARD SPRING#21011#10694.7800226145 47.61 Acres Construction DisturbanceRNG 1520 BLM#BUCKBOARD SPRING#21011#10694.7800226145 9.57 Acres Operation DisturbanceRNG 1520 BLM#BUCKBOARD SPRING#21011#10694.7800226145 9.55 Acres Operation DisturbanceRNG 1520 BLM#BUCKHORN#21012#80843.225398471 139.58 Acres Construction DisturbanceRNG 1520 BLM#BUCKHORN#21012#80843.225398471 139.20 Acres Construction DisturbanceRNG 1520 BLM#BUCKHORN#21012#80843.225398471 37.63 Acres Operation DisturbanceRNG 1520 BLM#BUCKHORN#21012#80843.225398471 37.57 Acres Operation DisturbanceRNG 1520 BLM#CALIENTE#21014#1859.99933172997 0.59 Acres Construction DisturbanceRNG 1520 BLM#CALIENTE#21014#1859.99933172997 0.58 Acres Construction DisturbanceRNG 1520 BLM#CALIENTE#21014#1859.99933172997 0.15 Acres Operation DisturbanceRNG 1520 BLM#CALIENTE#21014#1859.99933172997 0.15 Acres Operation DisturbanceRNG 1520 BLM#CLIFF SPRINGS#21016#37080.8996730193 0.44 Acres Construction DisturbanceRNG 1520 BLM#CLIFF SPRINGS#21016#37080.8996730193 0.44 Acres Construction DisturbanceRNG 1520 BLM#CLIFF SPRINGS#21016#37080.8996730193 0.20 Acres Operation DisturbanceRNG 1520 BLM#CLIFF SPRINGS#21016#37080.8996730193 0.20 Acres Operation DisturbanceRNG 1520 BLM#COMET#21018#21199.6471378373 0.04 Acres Construction DisturbanceRNG 1520 BLM#COMET#21018#21199.6471378373 0.79 Acres Construction DisturbanceRNG 1520 BLM#COMET#21018#21199.6471378373 0.02 Acres Operation DisturbanceRNG 1520 BLM#COMET#21018#21199.6471378373 0.35 Acres Operation DisturbanceRNG 1520 BLM#DELAMAR#01083#242971.649210476 127.45 Acres Construction DisturbanceRNG 1520 BLM#DELAMAR#01083#242971.649210476 147.85 Acres Construction DisturbanceRNG 1520 BLM#DELAMAR#01083#242971.649210476 19.48 Acres Operation DisturbanceRNG 1520 BLM#DELAMAR#01083#242971.649210476 28.77 Acres Operation DisturbanceRNG 1520 BLM#DRY LAKE#02007#39362.5364055513 26.69 Acres Construction DisturbanceRNG 1520 BLM#DRY LAKE#02007#39362.5364055513 28.22 Acres Construction DisturbanceRNG 1520 BLM#DRY LAKE#02007#39362.5364055513 7.73 Acres Operation DisturbanceRNG 1520 BLM#DRY LAKE#02007#39362.5364055513 8.44 Acres Operation DisturbanceRNG 1520 BLM#HIGHWAY#01036#4256.79336131265 28.98 Acres Construction DisturbanceRNG 1520 BLM#HIGHWAY#01036#4256.79336131265 31.03 Acres Construction DisturbanceRNG 1520 BLM#HIGHWAY#01036#4256.79336131265 6.14 Acres Operation DisturbanceRNG 1520 BLM#HIGHWAY#01036#4256.79336131265 6.58 Acres Operation DisturbanceRNG 1520 BLM#LOWER LAKE EAST#21022#52675.7544587987 147.01 Acres Construction DisturbanceRNG 1520 BLM#LOWER LAKE EAST#21022#52675.7544587987 148.36 Acres Construction DisturbanceRNG 1520 BLM#LOWER LAKE EAST#21022#52675.7544587987 26.88 Acres Operation DisturbanceRNG 1520 BLM#LOWER LAKE EAST#21022#52675.7544587987 27.66 Acres Operation DisturbanceRNG 1520 BLM#OAK SPRINGS#01050#198296.656621191 224.16 Acres Construction DisturbanceRNG 1520 BLM#OAK SPRINGS#01050#198296.656621191 223.63 Acres Construction DisturbanceRNG 1520 BLM#OAK SPRINGS#01050#198296.656621191 59.76 Acres Operation Disturbance

Page 205: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

RNG 1520 BLM#OAK SPRINGS#01050#198296.656621191 59.71 Acres Operation DisturbanceRNG 1520 BLM#PANACA CATTLE#01053#20136.1586983206 21.69 Acres Construction DisturbanceRNG 1520 BLM#PANACA CATTLE#01053#20136.1586983206 21.62 Acres Construction DisturbanceRNG 1520 BLM#PANACA CATTLE#01053#20136.1586983206 5.23 Acres Operation DisturbanceRNG 1520 BLM#PANACA CATTLE#01053#20136.1586983206 5.22 Acres Operation DisturbanceRNG 1520 BLM#PECK#01055#14599.7212135605 27.64 Acres Construction DisturbanceRNG 1520 BLM#PECK#01055#14599.7212135605 38.04 Acres Construction DisturbanceRNG 1520 BLM#PECK#01055#14599.7212135605 7.88 Acres Operation DisturbanceRNG 1520 BLM#PECK#01055#14599.7212135605 10.30 Acres Operation DisturbanceRNG 1520 BLM#PITTMAN WELL#02019#43306.1013345442 139.82 Acres Construction DisturbanceRNG 1520 BLM#PITTMAN WELL#02019#43306.1013345442 144.72 Acres Construction DisturbanceRNG 1520 BLM#PITTMAN WELL#02019#43306.1013345442 27.26 Acres Operation DisturbanceRNG 1520 BLM#PITTMAN WELL#02019#43306.1013345442 29.61 Acres Operation DisturbanceRNG 1520 BLM#SHEEP SPRING#01070#30380.5510248802 106.62 Acres Construction DisturbanceRNG 1520 BLM#SHEEP SPRING#01070#30380.5510248802 106.47 Acres Construction DisturbanceRNG 1520 BLM#SHEEP SPRING#01070#30380.5510248802 24.94 Acres Operation DisturbanceRNG 1520 BLM#SHEEP SPRING#01070#30380.5510248802 24.98 Acres Operation DisturbanceRNG 1520 BLM#UVADA#01079#11247.0828336584 13.80 Acres Construction DisturbanceRNG 1520 BLM#UVADA#01079#11247.0828336584 13.77 Acres Construction DisturbanceRNG 1520 BLM#UVADA#01079#11247.0828336584 4.82 Acres Operation DisturbanceRNG 1520 BLM#UVADA#01079#11247.0828336584 4.82 Acres Operation DisturbanceRNG 1530 BLM#GOURD SPRING#01071#97599.0929926493 84.56 Acres Construction DisturbanceRNG 1530 BLM#GOURD SPRING#01071#97599.0929926493 86.67 Acres Construction DisturbanceRNG 1530 BLM#GOURD SPRING#01071#97599.0929926493 18.33 Acres Operation DisturbanceRNG 1530 BLM#GOURD SPRING#01071#97599.0929926493 18.44 Acres Operation DisturbanceRNG 1540.1 BLM#ACTON-FARRIER#02001#47312.8434750944 3.85 Acres Construction DisturbanceRNG 1540.1 BLM#ACTON-FARRIER#02001#47312.8434750944 4.94 Acres Construction DisturbanceRNG 1540.1 BLM#ACTON-FARRIER#02001#47312.8434750944 0.52 Acres Operation DisturbanceRNG 1540.1 BLM#ACTON-FARRIER#02001#47312.8434750944 0.85 Acres Operation DisturbanceRNG 1540.1 BLM#GLENDALE#02009#22639.1576774532 83.95 Acres Construction DisturbanceRNG 1540.1 BLM#GLENDALE#02009#22639.1576774532 86.30 Acres Construction DisturbanceRNG 1540.1 BLM#GLENDALE#02009#22639.1576774532 12.46 Acres Operation DisturbanceRNG 1540.1 BLM#GLENDALE#02009#22639.1576774532 13.18 Acres Operation DisturbanceRNG 1540.1 BLM#GOURD SPRING#01071#97599.0929926493 44.21 Acres Construction DisturbanceRNG 1540.1 BLM#GOURD SPRING#01071#97599.0929926493 44.21 Acres Construction DisturbanceRNG 1540.1 BLM#GOURD SPRING#01071#97599.0929926493 2.50 Acres Operation DisturbanceRNG 1540.1 BLM#GOURD SPRING#01071#97599.0929926493 2.50 Acres Operation DisturbanceRNG 1540.1 BLM#LOWER MORMAN MESA#02013#47129.7286671628 2.55 Acres Construction DisturbanceRNG 1540.1 BLM#LOWER MORMAN MESA#02013#47129.7286671628 0.94 Acres Operation DisturbanceRNG 1540.1 BLM#LOWER MORMAN MESA#02013#47129.7286671628 0.94 Acres Operation DisturbanceRNG 1540.1 BLM#MESA CLIFF#02014#13466.3693986205 0.86 Acres Construction DisturbanceRNG 1540.1 BLM#MESA CLIFF#02014#13466.3693986205 0.86 Acres Construction DisturbanceRNG 1540.1 BLM#MESA CLIFF#02014#13466.3693986205 0.32 Acres Operation DisturbanceRNG 1540.1 BLM#MESA CLIFF#02014#13466.3693986205 0.32 Acres Operation DisturbanceRNG 1540.1 BLM#TOQUOP SHEEP#02023#24844.3412087395 24.91 Acres Construction Disturbance

Page 206: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

RNG 1540.1 BLM#TOQUOP SHEEP#02023#24844.3412087395 24.91 Acres Construction DisturbanceRNG 1540.1 BLM#TOQUOP SHEEP#02023#24844.3412087395 2.77 Acres Operation DisturbanceRNG 1540.1 BLM#TOQUOP SHEEP#02023#24844.3412087395 2.77 Acres Operation DisturbanceRNG 1540.1 BLM#UPPER MORMON MESA#02024#45698.0993993029 91.03 Acres Construction DisturbanceRNG 1540.1 BLM#UPPER MORMON MESA#02024#45698.0993993029 91.03 Acres Construction DisturbanceRNG 1540.1 BLM#UPPER MORMON MESA#02024#45698.0993993029 16.34 Acres Operation DisturbanceRNG 1540.1 BLM#UPPER MORMON MESA#02024#45698.0993993029 16.34 Acres Operation DisturbanceRNG 1540.2 BLM#ACTON-FARRIER#02001#47312.8434750944 14.53 Acres Construction DisturbanceRNG 1540.2 BLM#ACTON-FARRIER#02001#47312.8434750944 14.53 Acres Construction DisturbanceRNG 1540.2 BLM#ACTON-FARRIER#02001#47312.8434750944 1.44 Acres Operation DisturbanceRNG 1540.2 BLM#ACTON-FARRIER#02001#47312.8434750944 1.44 Acres Operation DisturbanceRNG 1540.2 BLM#DRY LAKE#02007#39362.5364055513 2.83 Acres Construction DisturbanceRNG 1540.2 BLM#DRY LAKE#02007#39362.5364055513 3.63 Acres Construction DisturbanceRNG 1540.2 BLM#DRY LAKE#02007#39362.5364055513 0.19 Acres Operation DisturbanceRNG 1540.2 BLM#DRY LAKE#02007#39362.5364055513 0.26 Acres Operation DisturbanceRNG 1540.2 BLM#UTE#02025#31572.8150489879 16.67 Acres Construction DisturbanceRNG 1540.2 BLM#UTE#02025#31572.8150489879 21.06 Acres Construction DisturbanceRNG 1540.2 BLM#UTE#02025#31572.8150489879 3.15 Acres Operation DisturbanceRNG 1540.2 BLM#UTE#02025#31572.8150489879 4.20 Acres Operation DisturbanceRNG 1545 BLM#ACTON-FARRIER#02001#47312.8434750944 14.73 Acres Construction DisturbanceRNG 1545 BLM#ACTON-FARRIER#02001#47312.8434750944 21.01 Acres Construction DisturbanceRNG 1545 BLM#ACTON-FARRIER#02001#47312.8434750944 2.25 Acres Operation DisturbanceRNG 1545 BLM#ACTON-FARRIER#02001#47312.8434750944 3.42 Acres Operation DisturbanceRNG 1545 BLM#MUDDY RIVER#02017#27313.4065440414 14.43 Acres Construction DisturbanceRNG 1545 BLM#MUDDY RIVER#02017#27313.4065440414 14.43 Acres Construction DisturbanceRNG 1545 BLM#MUDDY RIVER#02017#27313.4065440414 2.10 Acres Operation DisturbanceRNG 1545 BLM#MUDDY RIVER#02017#27313.4065440414 2.10 Acres Operation DisturbanceRNG 1545 BLM#UTE#02025#31572.8150489879 11.63 Acres Construction DisturbanceRNG 1545 BLM#UTE#02025#31572.8150489879 18.85 Acres Construction DisturbanceRNG 1545 BLM#UTE#02025#31572.8150489879 2.15 Acres Operation DisturbanceRNG 1545 BLM#UTE#02025#31572.8150489879 3.46 Acres Operation DisturbanceRNG 1550.1 BLM#GOURD SPRING#01071#97599.0929926493 24.21 Acres Construction DisturbanceRNG 1550.1 BLM#GOURD SPRING#01071#97599.0929926493 24.21 Acres Construction DisturbanceRNG 1550.1 BLM#GOURD SPRING#01071#97599.0929926493 5.80 Acres Operation DisturbanceRNG 1550.1 BLM#GOURD SPRING#01071#97599.0929926493 5.80 Acres Operation DisturbanceRNG 1550.1 BLM#LOWER MORMAN MESA#02013#47129.7286671628 64.56 Acres Construction DisturbanceRNG 1550.1 BLM#LOWER MORMAN MESA#02013#47129.7286671628 64.56 Acres Construction DisturbanceRNG 1550.1 BLM#LOWER MORMAN MESA#02013#47129.7286671628 24.24 Acres Operation DisturbanceRNG 1550.1 BLM#LOWER MORMAN MESA#02013#47129.7286671628 24.24 Acres Operation DisturbanceRNG 1550.1 BLM#MESA CLIFF#02014#13466.3693986205 59.56 Acres Construction DisturbanceRNG 1550.1 BLM#MESA CLIFF#02014#13466.3693986205 59.56 Acres Construction DisturbanceRNG 1550.1 BLM#MESA CLIFF#02014#13466.3693986205 17.45 Acres Operation DisturbanceRNG 1550.1 BLM#MESA CLIFF#02014#13466.3693986205 17.45 Acres Operation DisturbanceRNG 1550.1 BLM#MUDDY RIVER#02017#27313.4065440414 117.04 Acres Construction DisturbanceRNG 1550.1 BLM#MUDDY RIVER#02017#27313.4065440414 145.72 Acres Construction Disturbance

Page 207: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

RNG 1550.1 BLM#MUDDY RIVER#02017#27313.4065440414 33.38 Acres Operation DisturbanceRNG 1550.1 BLM#MUDDY RIVER#02017#27313.4065440414 40.92 Acres Operation DisturbanceRNG 1550.1 BLM#TOQUOP SHEEP#02023#24844.3412087395 30.17 Acres Construction DisturbanceRNG 1550.1 BLM#TOQUOP SHEEP#02023#24844.3412087395 30.17 Acres Construction DisturbanceRNG 1550.1 BLM#TOQUOP SHEEP#02023#24844.3412087395 11.91 Acres Operation DisturbanceRNG 1550.1 BLM#TOQUOP SHEEP#02023#24844.3412087395 11.91 Acres Operation DisturbanceRNG 1550.1 BLM#UPPER MORMON MESA#02024#45698.0993993029 27.21 Acres Construction DisturbanceRNG 1550.1 BLM#UPPER MORMON MESA#02024#45698.0993993029 27.21 Acres Construction DisturbanceRNG 1550.1 BLM#UPPER MORMON MESA#02024#45698.0993993029 10.88 Acres Operation DisturbanceRNG 1550.1 BLM#UPPER MORMON MESA#02024#45698.0993993029 10.88 Acres Operation DisturbanceRNG 1550.1 BLM#UTE#02025#31572.8150489879 0.11 Acres Construction DisturbanceRNG 1550.1 BLM#UTE#02025#31572.8150489879 0.11 Acres Construction DisturbanceRNG 1550.1 BLM#UTE#02025#31572.8150489879 0.06 Acres Operation DisturbanceRNG 1550.1 BLM#UTE#02025#31572.8150489879 0.06 Acres Operation DisturbanceRNG 1550.2 BLM#MUDDY MOUNTAINS#02016#210022.612700007 85.93 Acres Construction DisturbanceRNG 1550.2 BLM#MUDDY MOUNTAINS#02016#210022.612700007 86.63 Acres Construction DisturbanceRNG 1550.2 BLM#MUDDY MOUNTAINS#02016#210022.612700007 18.76 Acres Operation DisturbanceRNG 1550.2 BLM#MUDDY MOUNTAINS#02016#210022.612700007 18.96 Acres Operation DisturbanceRNG 1550.2 BLM#MUDDY RIVER#02017#27313.4065440414 43.70 Acres Construction DisturbanceRNG 1550.2 BLM#MUDDY RIVER#02017#27313.4065440414 43.80 Acres Construction DisturbanceRNG 1550.2 BLM#MUDDY RIVER#02017#27313.4065440414 9.80 Acres Operation DisturbanceRNG 1550.2 BLM#MUDDY RIVER#02017#27313.4065440414 9.83 Acres Operation DisturbanceRNG 1550.2 BLM#UTE#02025#31572.8150489879 1.62 Acres Construction DisturbanceRNG 1550.2 BLM#UTE#02025#31572.8150489879 1.62 Acres Construction DisturbanceRNG 1550.2 BLM#UTE#02025#31572.8150489879 0.44 Acres Operation DisturbanceRNG 1550.2 BLM#UTE#02025#31572.8150489879 0.44 Acres Operation DisturbanceRNG 1560 BLM#MUDDY MOUNTAINS#02016#210022.612700007 143.32 Acres Construction DisturbanceRNG 1560 BLM#MUDDY MOUNTAINS#02016#210022.612700007 143.32 Acres Construction DisturbanceRNG 1560 BLM#MUDDY MOUNTAINS#02016#210022.612700007 29.28 Acres Operation DisturbanceRNG 1560 BLM#MUDDY MOUNTAINS#02016#210022.612700007 29.28 Acres Operation DisturbanceRNG 1570 BLM#DRY LAKE#02007#39362.5364055513 17.09 Acres Construction DisturbanceRNG 1570 BLM#DRY LAKE#02007#39362.5364055513 17.41 Acres Construction DisturbanceRNG 1570 BLM#DRY LAKE#02007#39362.5364055513 3.32 Acres Operation DisturbanceRNG 1570 BLM#DRY LAKE#02007#39362.5364055513 3.39 Acres Operation DisturbanceRNG 1570 BLM#MUDDY MOUNTAINS#02016#210022.612700007 103.51 Acres Construction DisturbanceRNG 1570 BLM#MUDDY MOUNTAINS#02016#210022.612700007 103.72 Acres Construction DisturbanceRNG 1570 BLM#MUDDY MOUNTAINS#02016#210022.612700007 20.30 Acres Operation DisturbanceRNG 1570 BLM#MUDDY MOUNTAINS#02016#210022.612700007 20.35 Acres Operation DisturbanceRNG 1580 BLM#DRY LAKE#02007#39362.5364055513 27.88 Acres Construction DisturbanceRNG 1580 BLM#DRY LAKE#02007#39362.5364055513 35.87 Acres Construction DisturbanceRNG 1580 BLM#DRY LAKE#02007#39362.5364055513 4.65 Acres Operation DisturbanceRNG 1580 BLM#DRY LAKE#02007#39362.5364055513 5.95 Acres Operation DisturbanceRNG 1590 BLM#DRY LAKE#02007#39362.5364055513 21.66 Acres Construction DisturbanceRNG 1590 BLM#DRY LAKE#02007#39362.5364055513 21.66 Acres Construction DisturbanceRNG 1590 BLM#DRY LAKE#02007#39362.5364055513 1.85 Acres Operation Disturbance

Page 208: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

RNG 1590 BLM#DRY LAKE#02007#39362.5364055513 1.85 Acres Operation DisturbanceRNG 1590 BLM#MUDDY MOUNTAINS#02016#210022.612700007 59.32 Acres Construction DisturbanceRNG 1590 BLM#MUDDY MOUNTAINS#02016#210022.612700007 59.32 Acres Construction DisturbanceRNG 1590 BLM#MUDDY MOUNTAINS#02016#210022.612700007 9.71 Acres Operation DisturbanceRNG 1590 BLM#MUDDY MOUNTAINS#02016#210022.612700007 9.71 Acres Operation DisturbanceRNG 1600 BLM#MUDDY MOUNTAINS#02016#210022.612700007 80.37 Acres Construction DisturbanceRNG 1600 BLM#MUDDY MOUNTAINS#02016#210022.612700007 80.37 Acres Construction DisturbanceRNG 1600 BLM#MUDDY MOUNTAINS#02016#210022.612700007 18.24 Acres Operation DisturbanceRNG 1600 BLM#MUDDY MOUNTAINS#02016#210022.612700007 18.24 Acres Operation DisturbanceRNG 1600 BLM#SUNRISE MOUNTAIN#02022#53592.1320967505 6.83 Acres Construction DisturbanceRNG 1600 BLM#SUNRISE MOUNTAIN#02022#53592.1320967505 6.83 Acres Construction DisturbanceRNG 1600 BLM#SUNRISE MOUNTAIN#02022#53592.1320967505 2.06 Acres Operation DisturbanceRNG 1600 BLM#SUNRISE MOUNTAIN#02022#53592.1320967505 2.06 Acres Operation DisturbanceRNG 1610 BLM#DRY LAKE#02007#39362.5364055513 53.82 Acres Construction DisturbanceRNG 1610 BLM#DRY LAKE#02007#39362.5364055513 53.82 Acres Construction DisturbanceRNG 1610 BLM#DRY LAKE#02007#39362.5364055513 11.32 Acres Operation DisturbanceRNG 1610 BLM#DRY LAKE#02007#39362.5364055513 11.32 Acres Operation DisturbanceRNG 1610 BLM#PITTMAN WELL#02019#43306.1013345442 1.05 Acres Construction DisturbanceRNG 1610 BLM#PITTMAN WELL#02019#43306.1013345442 1.06 Acres Construction DisturbanceRNG 1610 BLM#PITTMAN WELL#02019#43306.1013345442 0.27 Acres Operation DisturbanceRNG 1610 BLM#PITTMAN WELL#02019#43306.1013345442 0.27 Acres Operation DisturbanceRNG 1610 BLM#SUNRISE MOUNTAIN#02022#53592.1320967505 12.57 Acres Construction DisturbanceRNG 1610 BLM#SUNRISE MOUNTAIN#02022#53592.1320967505 12.57 Acres Construction DisturbanceRNG 1610 BLM#SUNRISE MOUNTAIN#02022#53592.1320967505 2.66 Acres Operation DisturbanceRNG 1610 BLM#SUNRISE MOUNTAIN#02022#53592.1320967505 2.66 Acres Operation DisturbanceRNG 1620 BLM#MUDDY MOUNTAINS#02016#210022.612700007 1.22 Acres Construction DisturbanceRNG 1620 BLM#MUDDY MOUNTAINS#02016#210022.612700007 1.22 Acres Construction DisturbanceRNG 1620 BLM#MUDDY MOUNTAINS#02016#210022.612700007 0.56 Acres Operation DisturbanceRNG 1620 BLM#SUNRISE MOUNTAIN#02022#53592.1320967505 61.68 Acres Construction DisturbanceRNG 1620 BLM#SUNRISE MOUNTAIN#02022#53592.1320967505 69.37 Acres Construction DisturbanceRNG 1620 BLM#SUNRISE MOUNTAIN#02022#53592.1320967505 13.37 Acres Operation DisturbanceRNG 1620 BLM#SUNRISE MOUNTAIN#02022#53592.1320967505 14.70 Acres Operation DisturbanceRNG 1630 BLM#SUNRISE MOUNTAIN#02022#53592.1320967505 45.53 Acres Construction DisturbanceRNG 1630 BLM#SUNRISE MOUNTAIN#02022#53592.1320967505 47.49 Acres Construction DisturbanceRNG 1630 BLM#SUNRISE MOUNTAIN#02022#53592.1320967505 9.87 Acres Operation DisturbanceRNG 1630 BLM#SUNRISE MOUNTAIN#02022#53592.1320967505 10.21 Acres Operation DisturbanceRNG 1640 BLM#SUNRISE MOUNTAIN#02022#53592.1320967505 12.04 Acres Construction DisturbanceRNG 1640 BLM#SUNRISE MOUNTAIN#02022#53592.1320967505 59.68 Acres Construction DisturbanceRNG 1640 BLM#SUNRISE MOUNTAIN#02022#53592.1320967505 1.93 Acres Operation DisturbanceRNG 1640 BLM#SUNRISE MOUNTAIN#02022#53592.1320967505 8.89 Acres Operation DisturbanceRNG 1650 BLM#SUNRISE MOUNTAIN#02022#53592.1320967505 37.06 Acres Construction DisturbanceRNG 1650 BLM#SUNRISE MOUNTAIN#02022#53592.1320967505 51.04 Acres Construction DisturbanceRNG 1650 BLM#SUNRISE MOUNTAIN#02022#53592.1320967505 5.64 Acres Operation DisturbanceRNG 1650 BLM#SUNRISE MOUNTAIN#02022#53592.1320967505 8.14 Acres Operation DisturbanceRNG 1660 BLM#SUNRISE MOUNTAIN#02022#53592.1320967505 98.78 Acres Construction Disturbance

Page 209: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

RNG 1660 BLM#SUNRISE MOUNTAIN#02022#53592.1320967505 104.88 Acres Construction DisturbanceRNG 1660 BLM#SUNRISE MOUNTAIN#02022#53592.1320967505 26.31 Acres Operation DisturbanceRNG 1660 BLM#SUNRISE MOUNTAIN#02022#53592.1320967505 27.89 Acres Operation DisturbanceRNG 1670 BLM#MUDDY MOUNTAINS#02016#210022.612700007 0.01 Acres Construction DisturbanceRNG 1670 BLM#MUDDY MOUNTAINS#02016#210022.612700007 1.08 Acres Construction DisturbanceRNG 1670 BLM#MUDDY MOUNTAINS#02016#210022.612700007 0.00 Acres Operation DisturbanceRNG 1670 BLM#MUDDY MOUNTAINS#02016#210022.612700007 0.45 Acres Operation DisturbanceRNG 1670 BLM#SUNRISE MOUNTAIN#02022#53592.1320967505 10.51 Acres Construction DisturbanceRNG 1670 BLM#SUNRISE MOUNTAIN#02022#53592.1320967505 12.85 Acres Construction DisturbanceRNG 1670 BLM#SUNRISE MOUNTAIN#02022#53592.1320967505 2.82 Acres Operation DisturbanceRNG 1670 BLM#SUNRISE MOUNTAIN#02022#53592.1320967505 3.77 Acres Operation DisturbanceRNG 1760 BLM#IRETEBA PEAKS#15411#329403.680971632 37.26 Acres Construction DisturbanceRNG 1760 BLM#IRETEBA PEAKS#15411#329403.680971632 6.46 Acres Operation DisturbanceRNG 1760 BLM#MCCULLOUGH MTN#15413#219539.532560077 0.00 Acres Construction DisturbanceRNG 1760 BLM#MCCULLOUGH MTN#15413#219539.532560077 0.00 Acres Operation DisturbanceRNG 1771 BLM#IRETEBA PEAKS#15411#329403.680971632 177.92 Acres Construction DisturbanceRNG 1771 BLM#IRETEBA PEAKS#15411#329403.680971632 26.79 Acres Operation DisturbanceRNG 1771 BLM#MCCULLOUGH MTN#15413#219539.532560077 0.06 Acres Construction DisturbanceRNG 1771 BLM#MCCULLOUGH MTN#15413#219539.532560077 89.13 Acres Construction DisturbanceRNG 1771 BLM#MCCULLOUGH MTN#15413#219539.532560077 0.02 Acres Operation DisturbanceRNG 1771 BLM#MCCULLOUGH MTN#15413#219539.532560077 17.30 Acres Operation DisturbanceRNG 1772 BLM#MCCULLOUGH MTN#15413#219539.532560077 3.91 Acres Construction DisturbanceRNG 1772 BLM#MCCULLOUGH MTN#15413#219539.532560077 0.46 Acres Operation DisturbanceRNG 1780 BLM#IRETEBA PEAKS#15411#329403.680971632 24.36 Acres Construction DisturbanceRNG 1780 BLM#IRETEBA PEAKS#15411#329403.680971632 4.88 Acres Operation DisturbanceRNG 1780 BLM#MCCULLOUGH MTN#15413#219539.532560077 1.82 Acres Construction DisturbanceRNG 1780 BLM#MCCULLOUGH MTN#15413#219539.532560077 3.99 Acres Construction DisturbanceRNG 1780 BLM#MCCULLOUGH MTN#15413#219539.532560077 0.93 Acres Operation DisturbanceRNG 1780 BLM#MCCULLOUGH MTN#15413#219539.532560077 1.91 Acres Operation DisturbanceRNG 1790 BLM#MCCULLOUGH MTN#15413#219539.532560077 110.73 Acres Construction DisturbanceRNG 1790 BLM#MCCULLOUGH MTN#15413#219539.532560077 125.69 Acres Construction DisturbanceRNG 1790 BLM#MCCULLOUGH MTN#15413#219539.532560077 20.97 Acres Operation DisturbanceRNG 1790 BLM#MCCULLOUGH MTN#15413#219539.532560077 22.69 Acres Operation DisturbanceRNG 1800 BLM#IRETEBA PEAKS#15411#329403.680971632 6.06 Acres Construction DisturbanceRNG 1800 BLM#IRETEBA PEAKS#15411#329403.680971632 0.27 Acres Operation DisturbanceRNG 1800 BLM#MCCULLOUGH MTN#15413#219539.532560077 0.62 Acres Construction DisturbanceRNG 1800 BLM#MCCULLOUGH MTN#15413#219539.532560077 9.83 Acres Construction DisturbanceRNG 1800 BLM#MCCULLOUGH MTN#15413#219539.532560077 0.23 Acres Operation DisturbanceRNG 1800 BLM#MCCULLOUGH MTN#15413#219539.532560077 1.28 Acres Operation DisturbanceRNG 1810 BLM#MCCULLOUGH MTN#15413#219539.532560077 38.71 Acres Construction DisturbanceRNG 1810 BLM#MCCULLOUGH MTN#15413#219539.532560077 107.97 Acres Construction DisturbanceRNG 1810 BLM#MCCULLOUGH MTN#15413#219539.532560077 7.09 Acres Operation DisturbanceRNG 1810 BLM#MCCULLOUGH MTN#15413#219539.532560077 19.36 Acres Operation DisturbanceRNG 1820 BLM#IRETEBA PEAKS#15411#329403.680971632 0.76 Acres Construction DisturbanceRNG 1820 BLM#IRETEBA PEAKS#15411#329403.680971632 0.28 Acres Operation Disturbance

Page 210: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

RNG 1820 BLM#MCCULLOUGH MTN#15413#219539.532560077 0.01 Acres Construction DisturbanceRNG 1820 BLM#MCCULLOUGH MTN#15413#219539.532560077 80.70 Acres Construction DisturbanceRNG 1820 BLM#MCCULLOUGH MTN#15413#219539.532560077 0.00 Acres Operation DisturbanceRNG 1820 BLM#MCCULLOUGH MTN#15413#219539.532560077 11.40 Acres Operation DisturbanceRNG 1830 BLM#MCCULLOUGH MTN#15413#219539.532560077 10.78 Acres Construction DisturbanceRNG 1830 BLM#MCCULLOUGH MTN#15413#219539.532560077 0.77 Acres Operation DisturbanceScenic Quality Class Changes 1030 NO CHANGE 32.24 Miles Amount CrossedScenic Quality Class Changes 1040 NO CHANGE 9.18 Miles Amount CrossedScenic Quality Class Changes 1100 NO CHANGE 14.64 Miles Amount CrossedScenic Quality Class Changes 1101 NO CHANGE 0.80 Miles Amount CrossedScenic Quality Class Changes 1103 NO CHANGE 2.88 Miles Amount CrossedScenic Quality Class Changes 1104 NO CHANGE 3.94 Miles Amount CrossedScenic Quality Class Changes 1105 NO CHANGE 4.78 Miles Amount CrossedScenic Quality Class Changes 1106 NO CHANGE 5.66 Miles Amount CrossedScenic Quality Class Changes 1110 NO CHANGE 6.96 Miles Amount CrossedScenic Quality Class Changes 1115 B TO C 22.58 Miles Amount CrossedScenic Quality Class Changes 1115 NO CHANGE 23.29 Miles Amount CrossedScenic Quality Class Changes 1116 B TO C 7.38 Miles Amount CrossedScenic Quality Class Changes 1116 NO CHANGE 0.02 Miles Amount CrossedScenic Quality Class Changes 1120 B TO C 0.87 Miles Amount CrossedScenic Quality Class Changes 1120 NO CHANGE 31.80 Miles Amount CrossedScenic Quality Class Changes 1120.1 NO CHANGE 2.05 Miles Amount CrossedScenic Quality Class Changes 1120.2 B TO C 0.14 Miles Amount CrossedScenic Quality Class Changes 1120.2 NO CHANGE 2.89 Miles Amount CrossedScenic Quality Class Changes 1180 B TO C 4.43 Miles Amount CrossedScenic Quality Class Changes 1187 B TO C 24.08 Miles Amount CrossedScenic Quality Class Changes 1187 NO CHANGE 21.29 Miles Amount CrossedScenic Quality Class Changes 1190 A TO B 0.47 Miles Amount CrossedScenic Quality Class Changes 1190 B TO C 31.66 Miles Amount CrossedScenic Quality Class Changes 1190 NO CHANGE 101.43 Miles Amount CrossedScenic Quality Class Changes 1210 NO CHANGE 24.73 Miles Amount CrossedScenic Quality Class Changes 1211 NO CHANGE 8.18 Miles Amount CrossedScenic Quality Class Changes 1212 NO CHANGE 13.75 Miles Amount CrossedScenic Quality Class Changes 1214 NO CHANGE 9.93 Miles Amount CrossedScenic Quality Class Changes 1215 NO CHANGE 7.37 Miles Amount CrossedScenic Quality Class Changes 1215.05 NO CHANGE 9.58 Miles Amount CrossedScenic Quality Class Changes 1217.01 A TO B 12.61 Miles Amount CrossedScenic Quality Class Changes 1217.01 B TO C 0.33 Miles Amount CrossedScenic Quality Class Changes 1217.01 NO CHANGE 63.88 Miles Amount CrossedScenic Quality Class Changes 1217.02 A TO B 13.47 Miles Amount CrossedScenic Quality Class Changes 1217.02 NO CHANGE 2.56 Miles Amount CrossedScenic Quality Class Changes 1217.051 A TO B 0.16 Miles Amount CrossedScenic Quality Class Changes 1217.051 NO CHANGE 20.30 Miles Amount CrossedScenic Quality Class Changes 1217.052 A TO B 0.15 Miles Amount CrossedScenic Quality Class Changes 1217.052 NO CHANGE 15.68 Miles Amount Crossed

Page 211: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

Scenic Quality Class Changes 1217.1 B TO C 1.00 Miles Amount CrossedScenic Quality Class Changes 1217.1 NO CHANGE 19.86 Miles Amount CrossedScenic Quality Class Changes 1217.15 NO CHANGE 36.37 Miles Amount CrossedScenic Quality Class Changes 1218 A TO B 11.97 Miles Amount CrossedScenic Quality Class Changes 1219.1 A TO B 0.60 Miles Amount CrossedScenic Quality Class Changes 1219.2 A TO B 19.59 Miles Amount CrossedScenic Quality Class Changes 1219.2 NO CHANGE 0.20 Miles Amount CrossedScenic Quality Class Changes 1219.3 NO CHANGE 1.47 Miles Amount CrossedScenic Quality Class Changes 1219.4 NO CHANGE 0.94 Miles Amount CrossedScenic Quality Class Changes 1219.45 A TO B 1.47 Miles Amount CrossedScenic Quality Class Changes 1219.45 NO CHANGE 0.12 Miles Amount CrossedScenic Quality Class Changes 1219.5 A TO B 16.50 Miles Amount CrossedScenic Quality Class Changes 1219.5 NO CHANGE 0.32 Miles Amount CrossedScenic Quality Class Changes 1219.6 A TO B 4.56 Miles Amount CrossedScenic Quality Class Changes 1220 B TO C 29.34 Miles Amount CrossedScenic Quality Class Changes 1220 NO CHANGE 150.97 Miles Amount CrossedScenic Quality Class Changes 1222.05 B TO C 3.94 Miles Amount CrossedScenic Quality Class Changes 1222.05 NO CHANGE 37.23 Miles Amount CrossedScenic Quality Class Changes 1222.3 NO CHANGE 14.18 Miles Amount CrossedScenic Quality Class Changes 1223 B TO C 0.49 Miles Amount CrossedScenic Quality Class Changes 1223 NO CHANGE 17.67 Miles Amount CrossedScenic Quality Class Changes 1225.2 B TO C 2.32 Miles Amount CrossedScenic Quality Class Changes 1225.2 NO CHANGE 36.09 Miles Amount CrossedScenic Quality Class Changes 1270 NO CHANGE 10.77 Miles Amount CrossedScenic Quality Class Changes 1310 NO CHANGE 50.26 Miles Amount CrossedScenic Quality Class Changes 1320.05 NO CHANGE 37.45 Miles Amount CrossedScenic Quality Class Changes 1320.15 NO CHANGE 27.99 Miles Amount CrossedScenic Quality Class Changes 1320.2 NO CHANGE 6.39 Miles Amount CrossedScenic Quality Class Changes 1320.21 NO CHANGE 0.27 Miles Amount CrossedScenic Quality Class Changes 1321 NO CHANGE 31.56 Miles Amount CrossedScenic Quality Class Changes 1322 NO CHANGE 7.00 Miles Amount CrossedScenic Quality Class Changes 1322.5 NO CHANGE 7.41 Miles Amount CrossedScenic Quality Class Changes 1323 NO CHANGE 21.64 Miles Amount CrossedScenic Quality Class Changes 1324 NO CHANGE 4.65 Miles Amount CrossedScenic Quality Class Changes 1324.2 NO CHANGE 4.69 Miles Amount CrossedScenic Quality Class Changes 1324.4 NO CHANGE 4.75 Miles Amount CrossedScenic Quality Class Changes 1325 NO CHANGE 9.10 Miles Amount CrossedScenic Quality Class Changes 1325.1 A TO B 5.50 Miles Amount CrossedScenic Quality Class Changes 1325.1 NO CHANGE 37.77 Miles Amount CrossedScenic Quality Class Changes 1325.2 A TO B 3.34 Miles Amount CrossedScenic Quality Class Changes 1325.2 NO CHANGE 0.78 Miles Amount CrossedScenic Quality Class Changes 1330.1 NO CHANGE 98.93 Miles Amount CrossedScenic Quality Class Changes 1340 NO CHANGE 20.00 Miles Amount CrossedScenic Quality Class Changes 1350 NO CHANGE 14.72 Miles Amount CrossedScenic Quality Class Changes 1360 NO CHANGE 27.12 Miles Amount Crossed

Page 212: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

Scenic Quality Class Changes 1370 NO CHANGE 14.69 Miles Amount CrossedScenic Quality Class Changes 1380 NO CHANGE 13.22 Miles Amount CrossedScenic Quality Class Changes 1390 NO CHANGE 3.62 Miles Amount CrossedScenic Quality Class Changes 1400 B TO C 0.43 Miles Amount CrossedScenic Quality Class Changes 1400 NO CHANGE 23.61 Miles Amount CrossedScenic Quality Class Changes 1410 NO CHANGE 38.16 Miles Amount CrossedScenic Quality Class Changes 1420 NO CHANGE 7.95 Miles Amount CrossedScenic Quality Class Changes 1430 NO CHANGE 18.45 Miles Amount CrossedScenic Quality Class Changes 1440 NO CHANGE 1.14 Miles Amount CrossedScenic Quality Class Changes 1440 NO CHANGE 8.36 Miles Amount CrossedScenic Quality Class Changes 1450 NO CHANGE 7.01 Miles Amount CrossedScenic Quality Class Changes 1460 NO CHANGE 35.91 Miles Amount CrossedScenic Quality Class Changes 1470 NO CHANGE 38.68 Miles Amount CrossedScenic Quality Class Changes 1480 NO CHANGE 64.47 Miles Amount CrossedScenic Quality Class Changes 1490 NO CHANGE 14.10 Miles Amount CrossedScenic Quality Class Changes 1490.05 B TO C 0.52 Miles Amount CrossedScenic Quality Class Changes 1490.05 NO CHANGE 41.86 Miles Amount CrossedScenic Quality Class Changes 1495 NO CHANGE 7.64 Miles Amount CrossedScenic Quality Class Changes 1500 NO CHANGE 19.32 Miles Amount CrossedScenic Quality Class Changes 1500.02 NO CHANGE 18.62 Miles Amount CrossedScenic Quality Class Changes 1500.05 NO CHANGE 9.25 Miles Amount CrossedScenic Quality Class Changes 1501.1 NO CHANGE 14.16 Miles Amount CrossedScenic Quality Class Changes 1501.15 NO CHANGE 1.04 Miles Amount CrossedScenic Quality Class Changes 1502.5 A TO B 1.33 Miles Amount CrossedScenic Quality Class Changes 1502.5 NO CHANGE 41.58 Miles Amount CrossedScenic Quality Class Changes 1503 NO CHANGE 6.60 Miles Amount CrossedScenic Quality Class Changes 1503.5 NO CHANGE 0.65 Miles Amount CrossedScenic Quality Class Changes 1504 NO CHANGE 6.99 Miles Amount CrossedScenic Quality Class Changes 1505 NO CHANGE 9.25 Miles Amount CrossedScenic Quality Class Changes 1506 NO CHANGE 28.56 Miles Amount CrossedScenic Quality Class Changes 1510 B TO C 13.49 Miles Amount CrossedScenic Quality Class Changes 1510 NO CHANGE 43.03 Miles Amount CrossedScenic Quality Class Changes 1520 A TO B 7.20 Miles Amount CrossedScenic Quality Class Changes 1520 NO CHANGE 117.56 Miles Amount CrossedScenic Quality Class Changes 1530 NO CHANGE 7.00 Miles Amount CrossedScenic Quality Class Changes 1540.1 NO CHANGE 22.47 Miles Amount CrossedScenic Quality Class Changes 1540.2 NO CHANGE 18.80 Miles Amount CrossedScenic Quality Class Changes 1545 NO CHANGE 3.05 Miles Amount CrossedScenic Quality Class Changes 1550.1 NO CHANGE 24.98 Miles Amount CrossedScenic Quality Class Changes 1550.2 NO CHANGE 11.98 Miles Amount CrossedScenic Quality Class Changes 1560 NO CHANGE 11.48 Miles Amount CrossedScenic Quality Class Changes 1570 NO CHANGE 9.72 Miles Amount CrossedScenic Quality Class Changes 1580 NO CHANGE 3.62 Miles Amount CrossedScenic Quality Class Changes 1590 NO CHANGE 7.02 Miles Amount CrossedScenic Quality Class Changes 1600 NO CHANGE 5.49 Miles Amount Crossed

Page 213: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

Scenic Quality Class Changes 1610 NO CHANGE 19.34 Miles Amount CrossedScenic Quality Class Changes 1620 NO CHANGE 6.17 Miles Amount CrossedScenic Quality Class Changes 1630 NO CHANGE 4.09 Miles Amount CrossedScenic Quality Class Changes 1640 NO CHANGE 3.00 Miles Amount CrossedScenic Quality Class Changes 1650 NO CHANGE 2.77 Miles Amount CrossedScenic Quality Class Changes 1660 NO CHANGE 7.19 Miles Amount CrossedScenic Quality Class Changes 1670 NO CHANGE 4.79 Miles Amount CrossedScenic Quality Class Changes 1680 NO CHANGE 4.18 Miles Amount CrossedScenic Quality Class Changes 1690 NO CHANGE 5.42 Miles Amount CrossedScenic Quality Class Changes 1700 NO CHANGE 1.70 Miles Amount CrossedScenic Quality Class Changes 1710 NO CHANGE 8.31 Miles Amount CrossedScenic Quality Class Changes 1730 NO CHANGE 8.07 Miles Amount CrossedScenic Quality Class Changes 1740 NO CHANGE 4.84 Miles Amount CrossedScenic Quality Class Changes 1750 NO CHANGE 0.42 Miles Amount CrossedScenic Quality Class Changes 1760 NO CHANGE 8.31 Miles Amount CrossedScenic Quality Class Changes 1771 NO CHANGE 21.29 Miles Amount CrossedScenic Quality Class Changes 1772 NO CHANGE 0.31 Miles Amount CrossedScenic Quality Class Changes 1780 NO CHANGE 3.75 Miles Amount CrossedScenic Quality Class Changes 1790 NO CHANGE 12.68 Miles Amount CrossedScenic Quality Class Changes 1800 NO CHANGE 0.93 Miles Amount CrossedScenic Quality Class Changes 1810 NO CHANGE 7.97 Miles Amount CrossedScenic Quality Class Changes 1820 NO CHANGE 7.09 Miles Amount CrossedScenic Quality Class Changes 1830 NO CHANGE 0.46 Miles Amount CrossedScenic_Quality 1030 B 14.82 Miles Amount CrossedScenic_Quality 1030 C 17.42 Miles Amount CrossedScenic_Quality 1040 C 9.18 Miles Amount CrossedScenic_Quality 1100 B 2.02 Miles Amount CrossedScenic_Quality 1100 C 12.62 Miles Amount CrossedScenic_Quality 1101 C 0.80 Miles Amount CrossedScenic_Quality 1103 C 2.88 Miles Amount CrossedScenic_Quality 1104 B 0.26 Miles Amount CrossedScenic_Quality 1104 C 3.68 Miles Amount CrossedScenic_Quality 1105 B 2.19 Miles Amount CrossedScenic_Quality 1105 C 2.60 Miles Amount CrossedScenic_Quality 1106 B 0.61 Miles Amount CrossedScenic_Quality 1106 C 5.05 Miles Amount CrossedScenic_Quality 1110 C 6.96 Miles Amount CrossedScenic_Quality 1115 B 22.58 Miles Amount CrossedScenic_Quality 1115 C 23.29 Miles Amount CrossedScenic_Quality 1116 B 7.38 Miles Amount CrossedScenic_Quality 1116 C 0.02 Miles Amount CrossedScenic_Quality 1120 B 8.34 Miles Amount CrossedScenic_Quality 1120 C 24.33 Miles Amount CrossedScenic_Quality 1120.1 C 2.05 Miles Amount CrossedScenic_Quality 1120.2 B 0.14 Miles Amount Crossed

Page 214: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

Scenic_Quality 1120.2 C 2.89 Miles Amount CrossedScenic_Quality 1180 B 4.43 Miles Amount CrossedScenic_Quality 1187 A 0.65 Miles Amount CrossedScenic_Quality 1187 B 29.66 Miles Amount CrossedScenic_Quality 1187 C 15.05 Miles Amount CrossedScenic_Quality 1190 A 0.47 Miles Amount CrossedScenic_Quality 1190 B 72.90 Miles Amount CrossedScenic_Quality 1190 C 60.19 Miles Amount CrossedScenic_Quality 1210 C 24.73 Miles Amount CrossedScenic_Quality 1211 B 8.17 Miles Amount CrossedScenic_Quality 1211 C 0.01 Miles Amount CrossedScenic_Quality 1212 B 13.75 Miles Amount CrossedScenic_Quality 1214 B 8.90 Miles Amount CrossedScenic_Quality 1214 C 1.03 Miles Amount CrossedScenic_Quality 1215 B 2.36 Miles Amount CrossedScenic_Quality 1215 C 5.01 Miles Amount CrossedScenic_Quality 1215.05 B 7.43 Miles Amount CrossedScenic_Quality 1215.05 C 2.14 Miles Amount CrossedScenic_Quality 1217.01 A 12.76 Miles Amount CrossedScenic_Quality 1217.01 B 29.62 Miles Amount CrossedScenic_Quality 1217.01 C 34.44 Miles Amount CrossedScenic_Quality 1217.02 A 13.47 Miles Amount CrossedScenic_Quality 1217.02 B 1.22 Miles Amount CrossedScenic_Quality 1217.02 C 1.34 Miles Amount CrossedScenic_Quality 1217.051 A 0.16 Miles Amount CrossedScenic_Quality 1217.051 B 11.32 Miles Amount CrossedScenic_Quality 1217.051 C 8.99 Miles Amount CrossedScenic_Quality 1217.052 A 0.15 Miles Amount CrossedScenic_Quality 1217.052 B 13.23 Miles Amount CrossedScenic_Quality 1217.052 C 2.45 Miles Amount CrossedScenic_Quality 1217.1 B 12.17 Miles Amount CrossedScenic_Quality 1217.1 C 8.70 Miles Amount CrossedScenic_Quality 1217.15 B 25.81 Miles Amount CrossedScenic_Quality 1217.15 C 10.56 Miles Amount CrossedScenic_Quality 1218 A 11.97 Miles Amount CrossedScenic_Quality 1219.1 A 0.60 Miles Amount CrossedScenic_Quality 1219.2 A 19.59 Miles Amount CrossedScenic_Quality 1219.2 C 0.20 Miles Amount CrossedScenic_Quality 1219.3 C 1.47 Miles Amount CrossedScenic_Quality 1219.4 B 0.94 Miles Amount CrossedScenic_Quality 1219.45 A 1.47 Miles Amount CrossedScenic_Quality 1219.45 B 0.12 Miles Amount CrossedScenic_Quality 1219.5 A 16.50 Miles Amount CrossedScenic_Quality 1219.5 C 0.32 Miles Amount CrossedScenic_Quality 1219.6 A 4.56 Miles Amount Crossed

Page 215: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

Scenic_Quality 1220 A 1.09 Miles Amount CrossedScenic_Quality 1220 B 64.12 Miles Amount CrossedScenic_Quality 1220 C 115.11 Miles Amount CrossedScenic_Quality 1222.05 B 13.44 Miles Amount CrossedScenic_Quality 1222.05 C 27.72 Miles Amount CrossedScenic_Quality 1222.3 B 0.76 Miles Amount CrossedScenic_Quality 1222.3 C 13.41 Miles Amount CrossedScenic_Quality 1223 B 3.82 Miles Amount CrossedScenic_Quality 1223 C 14.34 Miles Amount CrossedScenic_Quality 1225.2 B 14.97 Miles Amount CrossedScenic_Quality 1225.2 C 23.44 Miles Amount CrossedScenic_Quality 1270 B 2.73 Miles Amount CrossedScenic_Quality 1270 C 8.05 Miles Amount CrossedScenic_Quality 1310 B 29.10 Miles Amount CrossedScenic_Quality 1310 C 21.16 Miles Amount CrossedScenic_Quality 1320.05 A 0.20 Miles Amount CrossedScenic_Quality 1320.05 B 16.52 Miles Amount CrossedScenic_Quality 1320.05 C 20.73 Miles Amount CrossedScenic_Quality 1320.15 B 26.63 Miles Amount CrossedScenic_Quality 1320.15 C 1.35 Miles Amount CrossedScenic_Quality 1320.2 B 5.99 Miles Amount CrossedScenic_Quality 1320.2 C 0.40 Miles Amount CrossedScenic_Quality 1320.21 B 0.27 Miles Amount CrossedScenic_Quality 1321 B 19.94 Miles Amount CrossedScenic_Quality 1321 C 11.62 Miles Amount CrossedScenic_Quality 1322 B 3.40 Miles Amount CrossedScenic_Quality 1322 C 3.60 Miles Amount CrossedScenic_Quality 1322.5 B 7.41 Miles Amount CrossedScenic_Quality 1323 B 20.18 Miles Amount CrossedScenic_Quality 1323 C 1.46 Miles Amount CrossedScenic_Quality 1324 B 4.65 Miles Amount CrossedScenic_Quality 1324.2 B 4.69 Miles Amount CrossedScenic_Quality 1324.4 B 4.75 Miles Amount CrossedScenic_Quality 1325 B 7.34 Miles Amount CrossedScenic_Quality 1325 C 1.75 Miles Amount CrossedScenic_Quality 1325.1 A 5.96 Miles Amount CrossedScenic_Quality 1325.1 B 29.53 Miles Amount CrossedScenic_Quality 1325.1 C 7.78 Miles Amount CrossedScenic_Quality 1325.2 A 3.34 Miles Amount CrossedScenic_Quality 1325.2 B 0.78 Miles Amount CrossedScenic_Quality 1330.1 A 1.10 Miles Amount CrossedScenic_Quality 1330.1 B 39.16 Miles Amount CrossedScenic_Quality 1330.1 C 58.67 Miles Amount CrossedScenic_Quality 1340 B 9.39 Miles Amount CrossedScenic_Quality 1340 C 10.62 Miles Amount Crossed

Page 216: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

Scenic_Quality 1350 B 9.43 Miles Amount CrossedScenic_Quality 1350 C 5.29 Miles Amount CrossedScenic_Quality 1360 B 5.08 Miles Amount CrossedScenic_Quality 1360 C 22.04 Miles Amount CrossedScenic_Quality 1370 B 10.19 Miles Amount CrossedScenic_Quality 1370 C 4.50 Miles Amount CrossedScenic_Quality 1380 B 1.96 Miles Amount CrossedScenic_Quality 1380 C 11.26 Miles Amount CrossedScenic_Quality 1390 C 3.62 Miles Amount CrossedScenic_Quality 1400 B 9.28 Miles Amount CrossedScenic_Quality 1400 C 14.76 Miles Amount CrossedScenic_Quality 1410 B 2.76 Miles Amount CrossedScenic_Quality 1410 C 35.41 Miles Amount CrossedScenic_Quality 1420 C 7.95 Miles Amount CrossedScenic_Quality 1430 C 18.45 Miles Amount CrossedScenic_Quality 1440 C 8.36 Miles Amount CrossedScenic_Quality 1440 N 1.14 Miles Amount CrossedScenic_Quality 1450 C 7.01 Miles Amount CrossedScenic_Quality 1460 B 5.73 Miles Amount CrossedScenic_Quality 1460 C 30.17 Miles Amount CrossedScenic_Quality 1470 B 13.04 Miles Amount CrossedScenic_Quality 1470 C 25.64 Miles Amount CrossedScenic_Quality 1480 B 11.57 Miles Amount CrossedScenic_Quality 1480 C 52.89 Miles Amount CrossedScenic_Quality 1490 C 14.10 Miles Amount CrossedScenic_Quality 1490.05 B 0.52 Miles Amount CrossedScenic_Quality 1490.05 C 41.86 Miles Amount CrossedScenic_Quality 1495 C 7.64 Miles Amount CrossedScenic_Quality 1500 C 19.32 Miles Amount CrossedScenic_Quality 1500.02 B 0.98 Miles Amount CrossedScenic_Quality 1500.02 C 17.64 Miles Amount CrossedScenic_Quality 1500.05 B 7.73 Miles Amount CrossedScenic_Quality 1500.05 C 1.52 Miles Amount CrossedScenic_Quality 1501.1 B 13.26 Miles Amount CrossedScenic_Quality 1501.1 C 0.90 Miles Amount CrossedScenic_Quality 1501.15 B 1.04 Miles Amount CrossedScenic_Quality 1502.5 A 1.33 Miles Amount CrossedScenic_Quality 1502.5 B 23.51 Miles Amount CrossedScenic_Quality 1502.5 C 18.07 Miles Amount CrossedScenic_Quality 1503 B 6.60 Miles Amount CrossedScenic_Quality 1503.5 B 0.65 Miles Amount CrossedScenic_Quality 1504 B 6.49 Miles Amount CrossedScenic_Quality 1504 C 0.49 Miles Amount CrossedScenic_Quality 1505 B 9.25 Miles Amount CrossedScenic_Quality 1506 B 23.89 Miles Amount Crossed

Page 217: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

Scenic_Quality 1506 C 4.66 Miles Amount CrossedScenic_Quality 1510 A 12.55 Miles Amount CrossedScenic_Quality 1510 B 31.78 Miles Amount CrossedScenic_Quality 1510 C 12.19 Miles Amount CrossedScenic_Quality 1520 A 8.35 Miles Amount CrossedScenic_Quality 1520 B 77.29 Miles Amount CrossedScenic_Quality 1520 C 39.12 Miles Amount CrossedScenic_Quality 1530 B 0.67 Miles Amount CrossedScenic_Quality 1530 C 6.34 Miles Amount CrossedScenic_Quality 1540.1 B 19.29 Miles Amount CrossedScenic_Quality 1540.1 C 3.18 Miles Amount CrossedScenic_Quality 1540.2 B 2.13 Miles Amount CrossedScenic_Quality 1540.2 C 16.68 Miles Amount CrossedScenic_Quality 1545 B 1.03 Miles Amount CrossedScenic_Quality 1545 C 2.01 Miles Amount CrossedScenic_Quality 1550.1 B 20.44 Miles Amount CrossedScenic_Quality 1550.1 C 4.54 Miles Amount CrossedScenic_Quality 1550.2 B 2.05 Miles Amount CrossedScenic_Quality 1550.2 C 9.93 Miles Amount CrossedScenic_Quality 1560 B 0.43 Miles Amount CrossedScenic_Quality 1560 C 11.05 Miles Amount CrossedScenic_Quality 1570 B 0.27 Miles Amount CrossedScenic_Quality 1570 C 9.45 Miles Amount CrossedScenic_Quality 1580 C 3.62 Miles Amount CrossedScenic_Quality 1590 C 7.02 Miles Amount CrossedScenic_Quality 1600 C 5.49 Miles Amount CrossedScenic_Quality 1610 B 4.52 Miles Amount CrossedScenic_Quality 1610 C 14.82 Miles Amount CrossedScenic_Quality 1620 C 6.17 Miles Amount CrossedScenic_Quality 1630 B 3.85 Miles Amount CrossedScenic_Quality 1630 C 0.24 Miles Amount CrossedScenic_Quality 1640 B 0.58 Miles Amount CrossedScenic_Quality 1640 C 2.42 Miles Amount CrossedScenic_Quality 1650 A 1.11 Miles Amount CrossedScenic_Quality 1650 B 1.66 Miles Amount CrossedScenic_Quality 1660 A 1.75 Miles Amount CrossedScenic_Quality 1660 B 4.76 Miles Amount CrossedScenic_Quality 1660 C 0.68 Miles Amount CrossedScenic_Quality 1670 A 3.27 Miles Amount CrossedScenic_Quality 1670 B 0.94 Miles Amount CrossedScenic_Quality 1670 C 0.59 Miles Amount CrossedScenic_Quality 1680 A 2.76 Miles Amount CrossedScenic_Quality 1680 C 1.43 Miles Amount CrossedScenic_Quality 1690 A 0.98 Miles Amount CrossedScenic_Quality 1690 B 0.61 Miles Amount Crossed

Page 218: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

Scenic_Quality 1690 C 3.83 Miles Amount CrossedScenic_Quality 1700 A 1.70 Miles Amount CrossedScenic_Quality 1710 A 2.87 Miles Amount CrossedScenic_Quality 1710 C 5.44 Miles Amount CrossedScenic_Quality 1730 A 0.62 Miles Amount CrossedScenic_Quality 1730 B 2.50 Miles Amount CrossedScenic_Quality 1730 C 4.94 Miles Amount CrossedScenic_Quality 1740 A 0.81 Miles Amount CrossedScenic_Quality 1740 B 1.76 Miles Amount CrossedScenic_Quality 1740 C 2.27 Miles Amount CrossedScenic_Quality 1750 A 0.42 Miles Amount CrossedScenic_Quality 1760 A 0.90 Miles Amount CrossedScenic_Quality 1760 C 7.41 Miles Amount CrossedScenic_Quality 1771 A 1.78 Miles Amount CrossedScenic_Quality 1771 C 19.51 Miles Amount CrossedScenic_Quality 1772 C 0.31 Miles Amount CrossedScenic_Quality 1780 C 3.75 Miles Amount CrossedScenic_Quality 1790 A 0.70 Miles Amount CrossedScenic_Quality 1790 B 4.47 Miles Amount CrossedScenic_Quality 1790 C 7.51 Miles Amount CrossedScenic_Quality 1800 C 0.93 Miles Amount CrossedScenic_Quality 1810 C 7.97 Miles Amount CrossedScenic_Quality 1820 C 7.09 Miles Amount CrossedScenic_Quality 1830 C 0.46 Miles Amount CrossedSMA 1210 NM$Dinosaur National Monument$$209444.986456635 0.01 Acres Construction DisturbanceSMA 1210 NM$Dinosaur National Monument$$209444.986456635 0.01 Acres Operation DisturbanceSMA 1320.05 RA (F)$Bottle Hollow Reservoir$$419.961598644997 0.27 Acres Construction DisturbanceSMA 1320.05 RA (F)$Bottle Hollow Reservoir$$419.961598644997 0.09 Acres Operation DisturbanceSMA 1320.15 CE$Spencer Fork--Lasson$$804.605191935313 4.48 Acres Construction DisturbanceSMA 1320.15 CE$Spencer Fork--Lasson$$804.605191935313 3.18 Acres Operation DisturbanceSMA 1320.15 CWMU$CRAB CREEK$$10408.7484407055 1.32 Acres Construction DisturbanceSMA 1320.15 CWMU$CRAB CREEK$$10408.7484407055 0.94 Acres Operation DisturbanceSMA 1320.15 ST WMA$North Nebo WMA$Spencer Fork$7185.7016594497 73.87 Acres Construction DisturbanceSMA 1320.15 ST WMA$North Nebo WMA$Spencer Fork$7185.7016594497 32.23 Acres Operation DisturbanceSMA 1320.15 ST WMA$Northwest Manti WMA$Birdseye$998.415780835794 24.57 Acres Construction DisturbanceSMA 1320.15 ST WMA$Northwest Manti WMA$Birdseye$998.415780835794 6.74 Acres Operation DisturbanceSMA 1320.15 ST WMA$Northwest Manti WMA$Dairy Fork Unit$4568.16730769679 16.61 Acres Construction DisturbanceSMA 1320.15 ST WMA$Northwest Manti WMA$Dairy Fork Unit$4568.16730769679 6.13 Acres Operation DisturbanceSMA 1320.15 ST WMA$Northwest Manti WMA$Lake Fork$1210.80465583785 5.20 Acres Construction DisturbanceSMA 1320.15 ST WMA$Northwest Manti WMA$Lake Fork$1210.80465583785 2.78 Acres Operation DisturbanceSMA 1320.15 ST WMA$Northwest Manti WMA$Lasson Draw$2880.21326999225 0.10 Acres Construction DisturbanceSMA 1320.15 ST WMA$Northwest Manti WMA$Lasson Draw$2880.21326999225 0.07 Acres Operation DisturbanceSMA 1320.15 ST WMA$Northwest Manti WMA$Wildcat Canyon$1554.52540363878 12.48 Acres Construction DisturbanceSMA 1320.15 ST WMA$Northwest Manti WMA$Wildcat Canyon$1554.52540363878 5.63 Acres Operation DisturbanceSMA 1320.2 RA$Big Mountain Campground$$14.6021653886326 0.53 Acres Construction Disturbance

Page 219: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

SMA 1320.2 RA$Big Mountain Campground$$14.6021653886326 0.15 Acres Operation DisturbanceSMA 1320.2 ST WMA$South Nebo WMA$Triangle Ranch$4918.33161718452 15.89 Acres Construction DisturbanceSMA 1320.2 ST WMA$South Nebo WMA$Triangle Ranch$4918.33161718452 6.19 Acres Operation DisturbanceSMA 1320.21 ST WMA$South Nebo WMA$Triangle Ranch$4918.33161718452 0.48 Acres Construction DisturbanceSMA 1320.21 ST WMA$South Nebo WMA$Triangle Ranch$4918.33161718452 0.35 Acres Operation DisturbanceSMA 1321.01 CE$Sand Wash/Sink Draw$$11755.0393798207 19.98 Acres Construction DisturbanceSMA 1321.01 CE$Sand Wash/Sink Draw$$11755.0393798207 3.01 Acres Operation DisturbanceSMA 1321.01 ST Park$Starvation State Park$$7324.39056393008 1.22 Acres Construction DisturbanceSMA 1321.01 ST Park$Starvation State Park$$7324.39056393008 0.56 Acres Operation DisturbanceSMA 1321.01 ST WMA$Tabby Mountain WMA$Rabbit Gulch$9193.85470211076 48.43 Acres Construction DisturbanceSMA 1321.01 ST WMA$Tabby Mountain WMA$Rabbit Gulch$9193.85470211076 10.99 Acres Operation DisturbanceSMA 1321.02 CE$Sand Wash/Sink Draw$$11755.0393798207 15.79 Acres Construction DisturbanceSMA 1321.02 CE$Sand Wash/Sink Draw$$11755.0393798207 1.53 Acres Operation DisturbanceSMA 1322.01 CE$Sand Wash/Sink Draw$$11755.0393798207 14.72 Acres Construction DisturbanceSMA 1322.01 CE$Sand Wash/Sink Draw$$11755.0393798207 2.18 Acres Operation DisturbanceSMA 1322.02 CE$Sand Wash/Sink Draw$$11755.0393798207 39.75 Acres Construction DisturbanceSMA 1322.02 CE$Sand Wash/Sink Draw$$11755.0393798207 8.35 Acres Operation DisturbanceSMA 1322.02 ST WMA$Tabby Mountain WMA$Tabby Mountain$41212.91069249 12.07 Acres Construction DisturbanceSMA 1322.02 ST WMA$Tabby Mountain WMA$Tabby Mountain$41212.91069249 2.54 Acres Operation DisturbanceSMA 1322.11 CE$Sand Wash/Sink Draw$$11755.0393798207 33.93 Acres Construction DisturbanceSMA 1322.11 CE$Sand Wash/Sink Draw$$11755.0393798207 5.24 Acres Operation DisturbanceSMA 1322.22 ST WMA$Currant Creek WMA$Currant Creek$14665.6487077203 2.92 Acres Construction DisturbanceSMA 1322.22 ST WMA$Currant Creek WMA$Currant Creek$14665.6487077203 0.40 Acres Operation DisturbanceSMA 1322.23 ST WMA$Currant Creek WMA$Currant Creek$14665.6487077203 0.61 Acres Construction DisturbanceSMA 1322.23 ST WMA$Currant Creek WMA$Currant Creek$14665.6487077203 0.06 Acres Operation DisturbanceSMA 1322.51 CE$Sand Wash/Sink Draw$$11755.0393798207 18.96 Acres Construction DisturbanceSMA 1322.51 CE$Sand Wash/Sink Draw$$11755.0393798207 3.11 Acres Operation DisturbanceSMA 1322.52 CE$Sand Wash/Sink Draw$$11755.0393798207 1.32 Acres Construction DisturbanceSMA 1322.52 CE$Sand Wash/Sink Draw$$11755.0393798207 0.28 Acres Operation DisturbanceSMA 1322.53 ST WMA$Tabby Mountain WMA$Tabby Mountain$41212.91069249 9.40 Acres Construction DisturbanceSMA 1322.53 ST WMA$Tabby Mountain WMA$Tabby Mountain$41212.91069249 2.50 Acres Operation DisturbanceSMA 1322.71 CE$Sand Wash/Sink Draw$$11755.0393798207 8.55 Acres Construction DisturbanceSMA 1322.71 CE$Sand Wash/Sink Draw$$11755.0393798207 2.54 Acres Operation DisturbanceSMA 1323.01 ST WMA$Currant Creek WMA$Currant Creek$14665.6487077203 22.64 Acres Construction DisturbanceSMA 1323.01 ST WMA$Currant Creek WMA$Currant Creek$14665.6487077203 5.82 Acres Operation DisturbanceSMA 1323.01 ST WMA$Tabby Mountain WMA$Tabby Mountain$41212.91069249 4.47 Acres Construction DisturbanceSMA 1323.01 ST WMA$Tabby Mountain WMA$Tabby Mountain$41212.91069249 1.46 Acres Operation DisturbanceSMA 1323.02 CWMU$DOUBLE R RANCH$$6390.39939115542 28.23 Acres Construction DisturbanceSMA 1323.02 CWMU$DOUBLE R RANCH$$6390.39939115542 12.17 Acres Operation DisturbanceSMA 1323.02 ST WMA$Currant Creek WMA$Wildcat$6737.1392268304 34.04 Acres Construction DisturbanceSMA 1323.02 ST WMA$Currant Creek WMA$Wildcat$6737.1392268304 8.67 Acres Operation DisturbanceSMA 1323.02 ST WMA$Strawberry River WMA$$6406.33320578144 3.78 Acres Construction DisturbanceSMA 1323.02 ST WMA$Strawberry River WMA$$6406.33320578144 2.10 Acres Operation DisturbanceSMA 1325 ST WMA$Northwest Manti WMA$Dairy Fork Unit$4568.16730769679 2.65 Acres Construction DisturbanceSMA 1325 ST WMA$Northwest Manti WMA$Dairy Fork Unit$4568.16730769679 1.00 Acres Operation Disturbance

Page 220: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

SMA 1350 ST WMA$South Nebo WMA$Triangle Ranch$4918.33161718452 31.56 Acres Construction DisturbanceSMA 1350 ST WMA$South Nebo WMA$Triangle Ranch$4918.33161718452 10.86 Acres Operation DisturbanceSMA 1360 RA (F)$Little Sahara RA$$57390.9563559978 42.83 Acres Construction DisturbanceSMA 1360 RA (F)$Little Sahara RA$$57390.9563559978 10.60 Acres Operation DisturbanceSOILS 1321.01 Compaction Prone 93.15 Acres Construction DisturbanceSOILS 1321.01 Compaction Prone 15.07 Acres Operation DisturbanceSOILS 1321.01 Corrosion Concrete 28.39 Acres Construction DisturbanceSOILS 1321.01 Corrosion Concrete 4.95 Acres Operation DisturbanceSOILS 1321.01 Corrosion Steel 229.46 Acres Construction DisturbanceSOILS 1321.01 Corrosion Steel 39.92 Acres Operation DisturbanceSOILS 1321.01 Hydric 0.33 Acres Construction DisturbanceSOILS 1321.01 Hydric 0.06 Acres Operation DisturbanceSOILS 1321.01 LRP 151.17 Acres Construction DisturbanceSOILS 1321.01 LRP 27.54 Acres Operation DisturbanceSOILS 1321.01 Shallow Bedrock 120.50 Acres Construction DisturbanceSOILS 1321.01 Shallow Bedrock 24.84 Acres Operation DisturbanceSOILS 1321.01 ShrinkSwell 4.61 Acres Construction DisturbanceSOILS 1321.01 ShrinkSwell 0.60 Acres Operation DisturbanceSOILS 1321.01 Water Erosion 7.63 Acres Construction DisturbanceSOILS 1321.01 Water Erosion 1.72 Acres Operation DisturbanceSOILS 1321.01 Wind Erosion 0.72 Acres Construction DisturbanceSOILS 1321.01 Wind Erosion 0.33 Acres Operation DisturbanceSOILS 1321.02 Compaction Prone 1.94 Acres Construction DisturbanceSOILS 1321.02 Compaction Prone 0.19 Acres Operation DisturbanceSOILS 1321.02 Corrosion Steel 8.06 Acres Construction DisturbanceSOILS 1321.02 Corrosion Steel 0.80 Acres Operation DisturbanceSOILS 1321.02 LRP 5.64 Acres Construction DisturbanceSOILS 1321.02 LRP 0.56 Acres Operation DisturbanceSOILS 1321.02 Shallow Bedrock 5.64 Acres Construction DisturbanceSOILS 1321.02 Shallow Bedrock 0.56 Acres Operation DisturbanceSOILS 1322.01 Compaction Prone 6.22 Acres Construction DisturbanceSOILS 1322.01 Compaction Prone 0.70 Acres Operation DisturbanceSOILS 1322.01 Corrosion Concrete 0.30 Acres Construction DisturbanceSOILS 1322.01 Corrosion Concrete 0.03 Acres Operation DisturbanceSOILS 1322.01 Corrosion Steel 10.89 Acres Construction DisturbanceSOILS 1322.01 Corrosion Steel 1.59 Acres Operation DisturbanceSOILS 1322.01 LRP 5.36 Acres Construction DisturbanceSOILS 1322.01 LRP 0.91 Acres Operation DisturbanceSOILS 1322.01 Shallow Bedrock 4.36 Acres Construction DisturbanceSOILS 1322.01 Shallow Bedrock 0.83 Acres Operation DisturbanceSOILS 1322.01 Water Erosion 1.50 Acres Construction DisturbanceSOILS 1322.01 Water Erosion 0.13 Acres Operation DisturbanceSOILS 1322.02 Compaction Prone 28.36 Acres Construction DisturbanceSOILS 1322.02 Compaction Prone 5.96 Acres Operation DisturbanceSOILS 1322.02 Corrosion Concrete 1.69 Acres Construction Disturbance

Page 221: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

SOILS 1322.02 Corrosion Concrete 0.35 Acres Operation DisturbanceSOILS 1322.02 Corrosion Steel 33.63 Acres Construction DisturbanceSOILS 1322.02 Corrosion Steel 7.07 Acres Operation DisturbanceSOILS 1322.02 LRP 10.83 Acres Construction DisturbanceSOILS 1322.02 LRP 2.27 Acres Operation DisturbanceSOILS 1322.02 Shallow Bedrock 5.21 Acres Construction DisturbanceSOILS 1322.02 Shallow Bedrock 1.09 Acres Operation DisturbanceSOILS 1322.02 Water Erosion 8.44 Acres Construction DisturbanceSOILS 1322.02 Water Erosion 1.77 Acres Operation DisturbanceSOILS 1322.11 Compaction Prone 20.99 Acres Construction DisturbanceSOILS 1322.11 Compaction Prone 3.24 Acres Operation DisturbanceSOILS 1322.11 Corrosion Concrete 1.26 Acres Construction DisturbanceSOILS 1322.11 Corrosion Concrete 0.19 Acres Operation DisturbanceSOILS 1322.11 Corrosion Steel 24.34 Acres Construction DisturbanceSOILS 1322.11 Corrosion Steel 3.76 Acres Operation DisturbanceSOILS 1322.11 LRP 7.55 Acres Construction DisturbanceSOILS 1322.11 LRP 1.17 Acres Operation DisturbanceSOILS 1322.11 Shallow Bedrock 3.36 Acres Construction DisturbanceSOILS 1322.11 Shallow Bedrock 0.52 Acres Operation DisturbanceSOILS 1322.11 Water Erosion 6.30 Acres Construction DisturbanceSOILS 1322.11 Water Erosion 0.97 Acres Operation DisturbanceSOILS 1322.12 Compaction Prone 12.93 Acres Construction DisturbanceSOILS 1322.12 Compaction Prone 1.76 Acres Operation DisturbanceSOILS 1322.12 Corrosion Concrete 0.78 Acres Construction DisturbanceSOILS 1322.12 Corrosion Concrete 0.11 Acres Operation DisturbanceSOILS 1322.12 Corrosion Steel 15.00 Acres Construction DisturbanceSOILS 1322.12 Corrosion Steel 2.04 Acres Operation DisturbanceSOILS 1322.12 LRP 4.65 Acres Construction DisturbanceSOILS 1322.12 LRP 0.63 Acres Operation DisturbanceSOILS 1322.12 Shallow Bedrock 2.07 Acres Construction DisturbanceSOILS 1322.12 Shallow Bedrock 0.28 Acres Operation DisturbanceSOILS 1322.12 Water Erosion 3.88 Acres Construction DisturbanceSOILS 1322.12 Water Erosion 0.53 Acres Operation DisturbanceSOILS 1322.21 Compaction Prone 11.74 Acres Construction DisturbanceSOILS 1322.21 Compaction Prone 2.89 Acres Operation DisturbanceSOILS 1322.21 Corrosion Concrete 0.70 Acres Construction DisturbanceSOILS 1322.21 Corrosion Concrete 0.17 Acres Operation DisturbanceSOILS 1322.21 Corrosion Steel 13.62 Acres Construction DisturbanceSOILS 1322.21 Corrosion Steel 3.35 Acres Operation DisturbanceSOILS 1322.21 LRP 4.23 Acres Construction DisturbanceSOILS 1322.21 LRP 1.04 Acres Operation DisturbanceSOILS 1322.21 Shallow Bedrock 1.88 Acres Construction DisturbanceSOILS 1322.21 Shallow Bedrock 0.46 Acres Operation DisturbanceSOILS 1322.21 Water Erosion 3.52 Acres Construction DisturbanceSOILS 1322.21 Water Erosion 0.87 Acres Operation Disturbance

Page 222: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

SOILS 1322.22 Compaction Prone 27.41 Acres Construction DisturbanceSOILS 1322.22 Compaction Prone 3.71 Acres Operation DisturbanceSOILS 1322.22 Corrosion Concrete 1.63 Acres Construction DisturbanceSOILS 1322.22 Corrosion Concrete 0.22 Acres Operation DisturbanceSOILS 1322.22 Corrosion Steel 32.58 Acres Construction DisturbanceSOILS 1322.22 Corrosion Steel 4.41 Acres Operation DisturbanceSOILS 1322.22 LRP 10.53 Acres Construction DisturbanceSOILS 1322.22 LRP 1.43 Acres Operation DisturbanceSOILS 1322.22 Shallow Bedrock 5.10 Acres Construction DisturbanceSOILS 1322.22 Shallow Bedrock 0.69 Acres Operation DisturbanceSOILS 1322.22 Water Erosion 8.15 Acres Construction DisturbanceSOILS 1322.22 Water Erosion 1.10 Acres Operation DisturbanceSOILS 1322.23 Compaction Prone 3.64 Acres Construction DisturbanceSOILS 1322.23 Compaction Prone 0.67 Acres Operation DisturbanceSOILS 1322.23 Corrosion Concrete 0.01 Acres Construction DisturbanceSOILS 1322.23 Corrosion Concrete 0.00 Acres Operation DisturbanceSOILS 1322.23 Corrosion Steel 14.41 Acres Construction DisturbanceSOILS 1322.23 Corrosion Steel 2.73 Acres Operation DisturbanceSOILS 1322.23 LRP 9.98 Acres Construction DisturbanceSOILS 1322.23 LRP 1.90 Acres Operation DisturbanceSOILS 1322.23 Shallow Bedrock 9.93 Acres Construction DisturbanceSOILS 1322.23 Shallow Bedrock 1.89 Acres Operation DisturbanceSOILS 1322.23 Water Erosion 0.07 Acres Construction DisturbanceSOILS 1322.23 Water Erosion 0.01 Acres Operation DisturbanceSOILS 1322.51 Compaction Prone 34.18 Acres Construction DisturbanceSOILS 1322.51 Compaction Prone 5.60 Acres Operation DisturbanceSOILS 1322.51 Corrosion Concrete 2.00 Acres Construction DisturbanceSOILS 1322.51 Corrosion Concrete 0.33 Acres Operation DisturbanceSOILS 1322.51 Corrosion Steel 42.30 Acres Construction DisturbanceSOILS 1322.51 Corrosion Steel 6.93 Acres Operation DisturbanceSOILS 1322.51 LRP 14.56 Acres Construction DisturbanceSOILS 1322.51 LRP 2.39 Acres Operation DisturbanceSOILS 1322.51 Shallow Bedrock 7.90 Acres Construction DisturbanceSOILS 1322.51 Shallow Bedrock 1.30 Acres Operation DisturbanceSOILS 1322.51 Water Erosion 9.99 Acres Construction DisturbanceSOILS 1322.51 Water Erosion 1.64 Acres Operation DisturbanceSOILS 1322.52 Compaction Prone 5.57 Acres Construction DisturbanceSOILS 1322.52 Compaction Prone 1.17 Acres Operation DisturbanceSOILS 1322.52 Corrosion Concrete 0.33 Acres Construction DisturbanceSOILS 1322.52 Corrosion Concrete 0.07 Acres Operation DisturbanceSOILS 1322.52 Corrosion Steel 6.46 Acres Construction DisturbanceSOILS 1322.52 Corrosion Steel 1.36 Acres Operation DisturbanceSOILS 1322.52 LRP 2.01 Acres Construction DisturbanceSOILS 1322.52 LRP 0.42 Acres Operation DisturbanceSOILS 1322.52 Shallow Bedrock 0.89 Acres Construction Disturbance

Page 223: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

SOILS 1322.52 Shallow Bedrock 0.19 Acres Operation DisturbanceSOILS 1322.52 Water Erosion 1.67 Acres Construction DisturbanceSOILS 1322.52 Water Erosion 0.35 Acres Operation DisturbanceSOILS 1322.53 Compaction Prone 12.63 Acres Construction DisturbanceSOILS 1322.53 Compaction Prone 3.36 Acres Operation DisturbanceSOILS 1322.53 Corrosion Concrete 0.76 Acres Construction DisturbanceSOILS 1322.53 Corrosion Concrete 0.20 Acres Operation DisturbanceSOILS 1322.53 Corrosion Steel 14.65 Acres Construction DisturbanceSOILS 1322.53 Corrosion Steel 3.90 Acres Operation DisturbanceSOILS 1322.53 LRP 4.55 Acres Construction DisturbanceSOILS 1322.53 LRP 1.21 Acres Operation DisturbanceSOILS 1322.53 Shallow Bedrock 2.02 Acres Construction DisturbanceSOILS 1322.53 Shallow Bedrock 0.54 Acres Operation DisturbanceSOILS 1322.53 Water Erosion 3.79 Acres Construction DisturbanceSOILS 1322.53 Water Erosion 1.01 Acres Operation DisturbanceSOILS 1322.71 Compaction Prone 79.52 Acres Construction DisturbanceSOILS 1322.71 Compaction Prone 22.26 Acres Operation DisturbanceSOILS 1322.71 Corrosion Concrete 4.33 Acres Construction DisturbanceSOILS 1322.71 Corrosion Concrete 1.21 Acres Operation DisturbanceSOILS 1322.71 Corrosion Steel 114.52 Acres Construction DisturbanceSOILS 1322.71 Corrosion Steel 32.16 Acres Operation DisturbanceSOILS 1322.71 LRP 47.57 Acres Construction DisturbanceSOILS 1322.71 LRP 13.41 Acres Operation DisturbanceSOILS 1322.71 Shallow Bedrock 33.15 Acres Construction DisturbanceSOILS 1322.71 Shallow Bedrock 9.38 Acres Operation DisturbanceSOILS 1322.71 Water Erosion 21.63 Acres Construction DisturbanceSOILS 1322.71 Water Erosion 6.05 Acres Operation DisturbanceSOILS 1323.01 Compaction Prone 30.82 Acres Construction DisturbanceSOILS 1323.01 Compaction Prone 8.04 Acres Operation DisturbanceSOILS 1323.01 Corrosion Concrete 1.55 Acres Construction DisturbanceSOILS 1323.01 Corrosion Concrete 0.40 Acres Operation DisturbanceSOILS 1323.01 Corrosion Steel 50.99 Acres Construction DisturbanceSOILS 1323.01 Corrosion Steel 13.22 Acres Operation DisturbanceSOILS 1323.01 LRP 24.05 Acres Construction DisturbanceSOILS 1323.01 LRP 6.21 Acres Operation DisturbanceSOILS 1323.01 Shallow Bedrock 18.90 Acres Construction DisturbanceSOILS 1323.01 Shallow Bedrock 4.86 Acres Operation DisturbanceSOILS 1323.01 Water Erosion 7.73 Acres Construction DisturbanceSOILS 1323.01 Water Erosion 2.02 Acres Operation DisturbanceSOILS 1323.02 Compaction Prone 64.30 Acres Construction DisturbanceSOILS 1323.02 Compaction Prone 22.40 Acres Operation DisturbanceSOILS 1323.02 Corrosion Concrete 11.77 Acres Construction DisturbanceSOILS 1323.02 Corrosion Concrete 4.40 Acres Operation DisturbanceSOILS 1323.02 Corrosion Steel 79.76 Acres Construction DisturbanceSOILS 1323.02 Corrosion Steel 27.16 Acres Operation Disturbance

Page 224: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

SOILS 1323.02 LRP 45.72 Acres Construction DisturbanceSOILS 1323.02 LRP 15.57 Acres Operation DisturbanceSOILS 1323.02 Shallow Bedrock 83.24 Acres Construction DisturbanceSOILS 1323.02 Shallow Bedrock 28.19 Acres Operation DisturbanceSOILS 1323.02 ShrinkSwell 16.66 Acres Construction DisturbanceSOILS 1323.02 ShrinkSwell 5.66 Acres Operation DisturbanceSOILS 1030 Compaction Prone 72.61 Acres Construction DisturbanceSOILS 1030 Compaction Prone 15.43 Acres Operation DisturbanceSOILS 1030 Corrosion Concrete 27.49 Acres Construction DisturbanceSOILS 1030 Corrosion Concrete 6.38 Acres Operation DisturbanceSOILS 1030 Corrosion Steel 191.63 Acres Construction DisturbanceSOILS 1030 Corrosion Steel 38.16 Acres Operation DisturbanceSOILS 1030 LRP 153.48 Acres Construction DisturbanceSOILS 1030 LRP 31.61 Acres Operation DisturbanceSOILS 1030 Shallow Bedrock 13.06 Acres Construction DisturbanceSOILS 1030 Shallow Bedrock 2.85 Acres Operation DisturbanceSOILS 1030 Shrink Swell 34.84 Acres Construction DisturbanceSOILS 1030 Shrink Swell 6.93 Acres Operation DisturbanceSOILS 1030 Water Erosion - Severe 63.53 Acres Construction DisturbanceSOILS 1030 Water Erosion - Severe 13.18 Acres Operation DisturbanceSOILS 1030 Wind Erosion - Severe 33.31 Acres Construction DisturbanceSOILS 1030 Wind Erosion - Severe 5.07 Acres Operation DisturbanceSOILS 1040 Compaction Prone 0.69 Acres Construction DisturbanceSOILS 1040 Compaction Prone 0.14 Acres Operation DisturbanceSOILS 1040 Corrosion Concrete 0.27 Acres Construction DisturbanceSOILS 1040 Corrosion Concrete 0.06 Acres Operation DisturbanceSOILS 1040 Corrosion Steel 52.44 Acres Construction DisturbanceSOILS 1040 Corrosion Steel 9.96 Acres Operation DisturbanceSOILS 1040 LRP 27.36 Acres Construction DisturbanceSOILS 1040 LRP 5.20 Acres Operation DisturbanceSOILS 1040 Shrink Swell 0.40 Acres Construction DisturbanceSOILS 1040 Shrink Swell 0.08 Acres Operation DisturbanceSOILS 1040 Water Erosion - Severe 1.31 Acres Construction DisturbanceSOILS 1040 Water Erosion - Severe 0.25 Acres Operation DisturbanceSOILS 1040 Wind Erosion - Severe 26.65 Acres Construction DisturbanceSOILS 1040 Wind Erosion - Severe 5.05 Acres Operation DisturbanceSOILS 1100 Compaction Prone 133.21 Acres Construction DisturbanceSOILS 1100 Compaction Prone 29.18 Acres Operation DisturbanceSOILS 1100 Corrosion Concrete 98.27 Acres Construction DisturbanceSOILS 1100 Corrosion Concrete 21.71 Acres Operation DisturbanceSOILS 1100 Corrosion Steel 144.25 Acres Construction DisturbanceSOILS 1100 Corrosion Steel 32.28 Acres Operation DisturbanceSOILS 1100 Hydric 0.00 Acres Construction DisturbanceSOILS 1100 Hydric 0.00 Acres Operation DisturbanceSOILS 1100 LRP 61.77 Acres Construction Disturbance

Page 225: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

SOILS 1100 LRP 14.23 Acres Operation DisturbanceSOILS 1100 Prime Farmland 64.66 Acres Construction DisturbanceSOILS 1100 Prime Farmland 13.32 Acres Operation DisturbanceSOILS 1100 Shallow Bedrock 1.53 Acres Construction DisturbanceSOILS 1100 Shallow Bedrock 0.76 Acres Operation DisturbanceSOILS 1100 Shallow Excavations 84.84 Acres Construction DisturbanceSOILS 1100 Shallow Excavations 19.63 Acres Operation DisturbanceSOILS 1100 Shrink Swell 91.42 Acres Construction DisturbanceSOILS 1100 Shrink Swell 20.54 Acres Operation DisturbanceSOILS 1100 Small Commercial Buildings 152.62 Acres Construction DisturbanceSOILS 1100 Small Commercial Buildings 33.86 Acres Operation DisturbanceSOILS 1100 Water Erosion - Severe 51.86 Acres Construction DisturbanceSOILS 1100 Water Erosion - Severe 11.53 Acres Operation DisturbanceSOILS 1100 Wind Erosion - Severe 5.02 Acres Construction DisturbanceSOILS 1100 Wind Erosion - Severe 1.37 Acres Operation DisturbanceSOILS 1101 Shallow Excavations 13.65 Acres Construction DisturbanceSOILS 1101 Shallow Excavations 2.01 Acres Operation DisturbanceSOILS 1101 Small Commercial Buildings 13.65 Acres Construction DisturbanceSOILS 1101 Small Commercial Buildings 2.01 Acres Operation DisturbanceSOILS 1101 Wind Erosion - Severe 13.65 Acres Construction DisturbanceSOILS 1101 Wind Erosion - Severe 2.01 Acres Operation DisturbanceSOILS 1103 Compaction Prone 1.76 Acres Construction DisturbanceSOILS 1103 Compaction Prone 0.33 Acres Operation DisturbanceSOILS 1103 Corrosion Steel 13.17 Acres Construction DisturbanceSOILS 1103 Corrosion Steel 2.36 Acres Operation DisturbanceSOILS 1103 Prime Farmland 13.06 Acres Construction DisturbanceSOILS 1103 Prime Farmland 2.33 Acres Operation DisturbanceSOILS 1103 Shallow Bedrock 0.17 Acres Construction DisturbanceSOILS 1103 Shallow Bedrock 0.05 Acres Operation DisturbanceSOILS 1103 Shallow Excavations 28.35 Acres Construction DisturbanceSOILS 1103 Shallow Excavations 4.33 Acres Operation DisturbanceSOILS 1103 Small Commercial Buildings 41.41 Acres Construction DisturbanceSOILS 1103 Small Commercial Buildings 6.66 Acres Operation DisturbanceSOILS 1103 Wind Erosion - Severe 26.98 Acres Construction DisturbanceSOILS 1103 Wind Erosion - Severe 4.11 Acres Operation DisturbanceSOILS 1104 Compaction Prone 15.19 Acres Construction DisturbanceSOILS 1104 Compaction Prone 3.33 Acres Operation DisturbanceSOILS 1104 Corrosion Steel 20.13 Acres Construction DisturbanceSOILS 1104 Corrosion Steel 4.47 Acres Operation DisturbanceSOILS 1104 Prime Farmland 15.72 Acres Construction DisturbanceSOILS 1104 Prime Farmland 3.44 Acres Operation DisturbanceSOILS 1104 Shallow Excavations 34.61 Acres Construction DisturbanceSOILS 1104 Shallow Excavations 8.44 Acres Operation DisturbanceSOILS 1104 Small Commercial Buildings 52.10 Acres Construction DisturbanceSOILS 1104 Small Commercial Buildings 12.25 Acres Operation Disturbance

Page 226: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

SOILS 1104 Wind Erosion - Severe 23.37 Acres Construction DisturbanceSOILS 1104 Wind Erosion - Severe 5.76 Acres Operation DisturbanceSOILS 1105 Compaction Prone 14.91 Acres Construction DisturbanceSOILS 1105 Compaction Prone 3.03 Acres Operation DisturbanceSOILS 1105 Corrosion Steel 27.92 Acres Construction DisturbanceSOILS 1105 Corrosion Steel 5.67 Acres Operation DisturbanceSOILS 1105 LRP 3.10 Acres Construction DisturbanceSOILS 1105 LRP 0.63 Acres Operation DisturbanceSOILS 1105 Prime Farmland 17.17 Acres Construction DisturbanceSOILS 1105 Prime Farmland 3.48 Acres Operation DisturbanceSOILS 1105 Shallow Excavations 36.93 Acres Construction DisturbanceSOILS 1105 Shallow Excavations 7.50 Acres Operation DisturbanceSOILS 1105 Small Commercial Buildings 57.20 Acres Construction DisturbanceSOILS 1105 Small Commercial Buildings 11.61 Acres Operation DisturbanceSOILS 1105 Wind Erosion - Severe 20.02 Acres Construction DisturbanceSOILS 1105 Wind Erosion - Severe 4.08 Acres Operation DisturbanceSOILS 1106 Compaction Prone 17.69 Acres Construction DisturbanceSOILS 1106 Compaction Prone 5.57 Acres Operation DisturbanceSOILS 1106 Corrosion Concrete 1.96 Acres Construction DisturbanceSOILS 1106 Corrosion Concrete 1.01 Acres Operation DisturbanceSOILS 1106 Corrosion Steel 37.54 Acres Construction DisturbanceSOILS 1106 Corrosion Steel 10.07 Acres Operation DisturbanceSOILS 1106 LRP 1.91 Acres Construction DisturbanceSOILS 1106 LRP 1.08 Acres Operation DisturbanceSOILS 1106 Prime Farmland 24.00 Acres Construction DisturbanceSOILS 1106 Prime Farmland 5.89 Acres Operation DisturbanceSOILS 1106 Shallow Bedrock 0.75 Acres Construction DisturbanceSOILS 1106 Shallow Bedrock 0.42 Acres Operation DisturbanceSOILS 1106 Shallow Excavations 49.89 Acres Construction DisturbanceSOILS 1106 Shallow Excavations 11.95 Acres Operation DisturbanceSOILS 1106 Shrink Swell 1.51 Acres Construction DisturbanceSOILS 1106 Shrink Swell 0.85 Acres Operation DisturbanceSOILS 1106 Small Commercial Buildings 73.89 Acres Construction DisturbanceSOILS 1106 Small Commercial Buildings 17.84 Acres Operation DisturbanceSOILS 1106 Water Erosion - Severe 1.56 Acres Construction DisturbanceSOILS 1106 Water Erosion - Severe 0.88 Acres Operation DisturbanceSOILS 1106 Wind Erosion - Severe 20.37 Acres Construction DisturbanceSOILS 1106 Wind Erosion - Severe 4.48 Acres Operation DisturbanceSOILS 1110 Compaction Prone 56.57 Acres Construction DisturbanceSOILS 1110 Compaction Prone 10.30 Acres Operation DisturbanceSOILS 1110 Corrosion Concrete 29.01 Acres Construction DisturbanceSOILS 1110 Corrosion Concrete 5.27 Acres Operation DisturbanceSOILS 1110 Corrosion Steel 35.54 Acres Construction DisturbanceSOILS 1110 Corrosion Steel 6.50 Acres Operation DisturbanceSOILS 1110 LRP 58.51 Acres Construction Disturbance

Page 227: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

SOILS 1110 LRP 10.66 Acres Operation DisturbanceSOILS 1110 Shallow Bedrock 11.64 Acres Construction DisturbanceSOILS 1110 Shallow Bedrock 2.11 Acres Operation DisturbanceSOILS 1110 Shallow Excavations 5.21 Acres Construction DisturbanceSOILS 1110 Shallow Excavations 1.06 Acres Operation DisturbanceSOILS 1110 Shrink Swell 22.45 Acres Construction DisturbanceSOILS 1110 Shrink Swell 4.07 Acres Operation DisturbanceSOILS 1110 Small Commercial Buildings 43.81 Acres Construction DisturbanceSOILS 1110 Small Commercial Buildings 8.10 Acres Operation DisturbanceSOILS 1110 Water Erosion - Severe 1.31 Acres Construction DisturbanceSOILS 1110 Water Erosion - Severe 0.27 Acres Operation DisturbanceSOILS 1110 Wind Erosion - Severe 2.10 Acres Construction DisturbanceSOILS 1110 Wind Erosion - Severe 0.39 Acres Operation DisturbanceSOILS 1115 Compaction Prone 206.87 Acres Construction DisturbanceSOILS 1115 Compaction Prone 39.82 Acres Operation DisturbanceSOILS 1115 Corrosion Concrete 48.60 Acres Construction DisturbanceSOILS 1115 Corrosion Concrete 9.43 Acres Operation DisturbanceSOILS 1115 Corrosion Steel 109.51 Acres Construction DisturbanceSOILS 1115 Corrosion Steel 21.31 Acres Operation DisturbanceSOILS 1115 LRP 314.98 Acres Construction DisturbanceSOILS 1115 LRP 60.84 Acres Operation DisturbanceSOILS 1115 Shallow Bedrock 172.38 Acres Construction DisturbanceSOILS 1115 Shallow Bedrock 33.24 Acres Operation DisturbanceSOILS 1115 Shrink Swell 88.75 Acres Construction DisturbanceSOILS 1115 Shrink Swell 17.16 Acres Operation DisturbanceSOILS 1115 Water Erosion - Severe 22.67 Acres Construction DisturbanceSOILS 1115 Water Erosion - Severe 4.39 Acres Operation DisturbanceSOILS 1115 Wind Erosion - Severe 16.78 Acres Construction DisturbanceSOILS 1115 Wind Erosion - Severe 3.25 Acres Operation DisturbanceSOILS 1116 Compaction Prone 57.82 Acres Construction DisturbanceSOILS 1116 Compaction Prone 11.22 Acres Operation DisturbanceSOILS 1116 Corrosion Concrete 0.00 Acres Construction DisturbanceSOILS 1116 Corrosion Concrete 0.00 Acres Operation DisturbanceSOILS 1116 Corrosion Steel 78.85 Acres Construction DisturbanceSOILS 1116 Corrosion Steel 15.30 Acres Operation DisturbanceSOILS 1116 LRP 63.08 Acres Construction DisturbanceSOILS 1116 LRP 12.24 Acres Operation DisturbanceSOILS 1116 Shallow Bedrock 15.77 Acres Construction DisturbanceSOILS 1116 Shallow Bedrock 3.06 Acres Operation DisturbanceSOILS 1116 Shallow Excavations 0.00 Acres Construction DisturbanceSOILS 1116 Shallow Excavations 0.00 Acres Operation DisturbanceSOILS 1116 Shrink Swell 10.51 Acres Construction DisturbanceSOILS 1116 Shrink Swell 2.04 Acres Operation DisturbanceSOILS 1116 Small Commercial Buildings 0.00 Acres Construction DisturbanceSOILS 1116 Small Commercial Buildings 0.00 Acres Operation Disturbance

Page 228: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

SOILS 1116 Water Erosion - Severe 31.54 Acres Construction DisturbanceSOILS 1116 Water Erosion - Severe 6.12 Acres Operation DisturbanceSOILS 1116 Wind Erosion - Severe 0.00 Acres Construction DisturbanceSOILS 1116 Wind Erosion - Severe 0.00 Acres Operation DisturbanceSOILS 1120 Compaction Prone 89.69 Acres Construction DisturbanceSOILS 1120 Compaction Prone 19.92 Acres Operation DisturbanceSOILS 1120 Corrosion Concrete 34.59 Acres Construction DisturbanceSOILS 1120 Corrosion Concrete 7.55 Acres Operation DisturbanceSOILS 1120 Corrosion Steel 137.73 Acres Construction DisturbanceSOILS 1120 Corrosion Steel 29.63 Acres Operation DisturbanceSOILS 1120 Hydric 0.01 Acres Construction DisturbanceSOILS 1120 Hydric 0.00 Acres Operation DisturbanceSOILS 1120 LRP 179.47 Acres Construction DisturbanceSOILS 1120 LRP 38.71 Acres Operation DisturbanceSOILS 1120 Shallow Bedrock 106.64 Acres Construction DisturbanceSOILS 1120 Shallow Bedrock 23.38 Acres Operation DisturbanceSOILS 1120 Shallow Excavations 2.35 Acres Construction DisturbanceSOILS 1120 Shallow Excavations 0.62 Acres Operation DisturbanceSOILS 1120 Shrink Swell 14.59 Acres Construction DisturbanceSOILS 1120 Shrink Swell 3.24 Acres Operation DisturbanceSOILS 1120 Small Commercial Buildings 2.93 Acres Construction DisturbanceSOILS 1120 Small Commercial Buildings 0.78 Acres Operation DisturbanceSOILS 1120 Water Erosion - Severe 23.43 Acres Construction DisturbanceSOILS 1120 Water Erosion - Severe 4.88 Acres Operation DisturbanceSOILS 1120 Wind Erosion - Severe 37.30 Acres Construction DisturbanceSOILS 1120 Wind Erosion - Severe 7.98 Acres Operation DisturbanceSOILS 1120.1 Compaction Prone 6.06 Acres Construction DisturbanceSOILS 1120.1 Compaction Prone 1.51 Acres Operation DisturbanceSOILS 1120.1 Corrosion Steel 15.69 Acres Construction DisturbanceSOILS 1120.1 Corrosion Steel 4.32 Acres Operation DisturbanceSOILS 1120.1 LRP 14.40 Acres Construction DisturbanceSOILS 1120.1 LRP 4.02 Acres Operation DisturbanceSOILS 1120.1 Shallow Bedrock 2.61 Acres Construction DisturbanceSOILS 1120.1 Shallow Bedrock 0.70 Acres Operation DisturbanceSOILS 1120.1 Shrink Swell 0.86 Acres Construction DisturbanceSOILS 1120.1 Shrink Swell 0.20 Acres Operation DisturbanceSOILS 1120.1 Water Erosion - Severe 5.22 Acres Construction DisturbanceSOILS 1120.1 Water Erosion - Severe 1.41 Acres Operation DisturbanceSOILS 1120.1 Wind Erosion - Severe 2.64 Acres Construction DisturbanceSOILS 1120.1 Wind Erosion - Severe 0.81 Acres Operation DisturbanceSOILS 1120.2 Compaction Prone 13.43 Acres Construction DisturbanceSOILS 1120.2 Compaction Prone 2.30 Acres Operation DisturbanceSOILS 1120.2 Corrosion Steel 25.44 Acres Construction DisturbanceSOILS 1120.2 Corrosion Steel 4.28 Acres Operation DisturbanceSOILS 1120.2 LRP 22.12 Acres Construction Disturbance

Page 229: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

SOILS 1120.2 LRP 3.71 Acres Operation DisturbanceSOILS 1120.2 Shallow Bedrock 4.58 Acres Construction DisturbanceSOILS 1120.2 Shallow Bedrock 0.78 Acres Operation DisturbanceSOILS 1120.2 Shrink Swell 2.21 Acres Construction DisturbanceSOILS 1120.2 Shrink Swell 0.38 Acres Operation DisturbanceSOILS 1120.2 Water Erosion - Severe 9.16 Acres Construction DisturbanceSOILS 1120.2 Water Erosion - Severe 1.55 Acres Operation DisturbanceSOILS 1120.2 Wind Erosion - Severe 2.53 Acres Construction DisturbanceSOILS 1120.2 Wind Erosion - Severe 0.41 Acres Operation DisturbanceSOILS 1180 Compaction Prone 35.37 Acres Construction DisturbanceSOILS 1180 Compaction Prone 7.14 Acres Operation DisturbanceSOILS 1180 Corrosion Steel 48.23 Acres Construction DisturbanceSOILS 1180 Corrosion Steel 9.74 Acres Operation DisturbanceSOILS 1180 LRP 38.58 Acres Construction DisturbanceSOILS 1180 LRP 7.79 Acres Operation DisturbanceSOILS 1180 Shallow Bedrock 9.65 Acres Construction DisturbanceSOILS 1180 Shallow Bedrock 1.95 Acres Operation DisturbanceSOILS 1180 Shrink Swell 6.43 Acres Construction DisturbanceSOILS 1180 Shrink Swell 1.30 Acres Operation DisturbanceSOILS 1180 Water Erosion - Severe 19.29 Acres Construction DisturbanceSOILS 1180 Water Erosion - Severe 3.90 Acres Operation DisturbanceSOILS 1187 Compaction Prone 137.37 Acres Construction DisturbanceSOILS 1187 Compaction Prone 37.31 Acres Operation DisturbanceSOILS 1187 Corrosion Concrete 120.50 Acres Construction DisturbanceSOILS 1187 Corrosion Concrete 32.92 Acres Operation DisturbanceSOILS 1187 Corrosion Steel 339.98 Acres Construction DisturbanceSOILS 1187 Corrosion Steel 91.21 Acres Operation DisturbanceSOILS 1187 Hydric 0.20 Acres Construction DisturbanceSOILS 1187 Hydric 0.07 Acres Operation DisturbanceSOILS 1187 LRP 155.78 Acres Construction DisturbanceSOILS 1187 LRP 43.32 Acres Operation DisturbanceSOILS 1187 Prime Farmland 78.76 Acres Construction DisturbanceSOILS 1187 Prime Farmland 18.62 Acres Operation DisturbanceSOILS 1187 Shallow Bedrock 121.10 Acres Construction DisturbanceSOILS 1187 Shallow Bedrock 31.59 Acres Operation DisturbanceSOILS 1187 Shallow Excavations 378.06 Acres Construction DisturbanceSOILS 1187 Shallow Excavations 101.52 Acres Operation DisturbanceSOILS 1187 Shrink Swell 27.08 Acres Construction DisturbanceSOILS 1187 Shrink Swell 7.92 Acres Operation DisturbanceSOILS 1187 Small Commercial Buildings 448.39 Acres Construction DisturbanceSOILS 1187 Small Commercial Buildings 119.13 Acres Operation DisturbanceSOILS 1187 Water Erosion - Severe 57.24 Acres Construction DisturbanceSOILS 1187 Water Erosion - Severe 17.73 Acres Operation DisturbanceSOILS 1187 Wind Erosion - Severe 162.84 Acres Construction DisturbanceSOILS 1187 Wind Erosion - Severe 40.69 Acres Operation Disturbance

Page 230: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

SOILS 1190 Compaction Prone 768.49 Acres Construction DisturbanceSOILS 1190 Compaction Prone 169.39 Acres Operation DisturbanceSOILS 1190 Corrosion Concrete 90.87 Acres Construction DisturbanceSOILS 1190 Corrosion Concrete 21.64 Acres Operation DisturbanceSOILS 1190 Corrosion Steel 874.79 Acres Construction DisturbanceSOILS 1190 Corrosion Steel 197.70 Acres Operation DisturbanceSOILS 1190 Hydric 9.13 Acres Construction DisturbanceSOILS 1190 Hydric 2.28 Acres Operation DisturbanceSOILS 1190 LRP 223.63 Acres Construction DisturbanceSOILS 1190 LRP 56.67 Acres Operation DisturbanceSOILS 1190 Prime Farmland 273.58 Acres Construction DisturbanceSOILS 1190 Prime Farmland 60.85 Acres Operation DisturbanceSOILS 1190 Shallow Bedrock 222.71 Acres Construction DisturbanceSOILS 1190 Shallow Bedrock 51.89 Acres Operation DisturbanceSOILS 1190 Shallow Excavations 762.79 Acres Construction DisturbanceSOILS 1190 Shallow Excavations 166.09 Acres Operation DisturbanceSOILS 1190 Shrink Swell 253.58 Acres Construction DisturbanceSOILS 1190 Shrink Swell 54.70 Acres Operation DisturbanceSOILS 1190 Small Commercial Buildings 1103.02 Acres Construction DisturbanceSOILS 1190 Small Commercial Buildings 240.54 Acres Operation DisturbanceSOILS 1190 Water Erosion - Severe 181.84 Acres Construction DisturbanceSOILS 1190 Water Erosion - Severe 38.81 Acres Operation DisturbanceSOILS 1190 Wind Erosion - Severe 232.35 Acres Construction DisturbanceSOILS 1190 Wind Erosion - Severe 54.79 Acres Operation DisturbanceSOILS 1210 Compaction Prone 163.22 Acres Construction DisturbanceSOILS 1210 Compaction Prone 29.86 Acres Operation DisturbanceSOILS 1210 Corrosion Concrete 103.11 Acres Construction DisturbanceSOILS 1210 Corrosion Concrete 19.32 Acres Operation DisturbanceSOILS 1210 Corrosion Steel 211.08 Acres Construction DisturbanceSOILS 1210 Corrosion Steel 42.56 Acres Operation DisturbanceSOILS 1210 LRP 130.27 Acres Construction DisturbanceSOILS 1210 LRP 26.80 Acres Operation DisturbanceSOILS 1210 Prime Farmland 46.17 Acres Construction DisturbanceSOILS 1210 Prime Farmland 9.22 Acres Operation DisturbanceSOILS 1210 Shallow Bedrock 44.21 Acres Construction DisturbanceSOILS 1210 Shallow Bedrock 11.03 Acres Operation DisturbanceSOILS 1210 Shallow Excavations 148.03 Acres Construction DisturbanceSOILS 1210 Shallow Excavations 30.23 Acres Operation DisturbanceSOILS 1210 Shrink Swell 98.77 Acres Construction DisturbanceSOILS 1210 Shrink Swell 17.44 Acres Operation DisturbanceSOILS 1210 Small Commercial Buildings 232.36 Acres Construction DisturbanceSOILS 1210 Small Commercial Buildings 44.50 Acres Operation DisturbanceSOILS 1210 Water Erosion - Severe 40.99 Acres Construction DisturbanceSOILS 1210 Water Erosion - Severe 6.70 Acres Operation DisturbanceSOILS 1210 Wind Erosion - Severe 20.38 Acres Construction Disturbance

Page 231: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

SOILS 1210 Wind Erosion - Severe 4.80 Acres Operation DisturbanceSOILS 1211 Compaction Prone 25.18 Acres Construction DisturbanceSOILS 1211 Compaction Prone 5.87 Acres Operation DisturbanceSOILS 1211 Corrosion Concrete 3.97 Acres Construction DisturbanceSOILS 1211 Corrosion Concrete 0.93 Acres Operation DisturbanceSOILS 1211 Corrosion Steel 85.03 Acres Construction DisturbanceSOILS 1211 Corrosion Steel 19.75 Acres Operation DisturbanceSOILS 1211 Hydric 0.00 Acres Construction DisturbanceSOILS 1211 Hydric 0.00 Acres Operation DisturbanceSOILS 1211 LRP 17.28 Acres Construction DisturbanceSOILS 1211 LRP 4.04 Acres Operation DisturbanceSOILS 1211 Shallow Bedrock 2.65 Acres Construction DisturbanceSOILS 1211 Shallow Bedrock 0.62 Acres Operation DisturbanceSOILS 1211 Shallow Excavations 70.38 Acres Construction DisturbanceSOILS 1211 Shallow Excavations 16.35 Acres Operation DisturbanceSOILS 1211 Shrink Swell 17.28 Acres Construction DisturbanceSOILS 1211 Shrink Swell 4.04 Acres Operation DisturbanceSOILS 1211 Small Commercial Buildings 85.03 Acres Construction DisturbanceSOILS 1211 Small Commercial Buildings 19.75 Acres Operation DisturbanceSOILS 1211 Water Erosion - Severe 25.10 Acres Construction DisturbanceSOILS 1211 Water Erosion - Severe 5.86 Acres Operation DisturbanceSOILS 1211 Wind Erosion - Severe 2.30 Acres Construction DisturbanceSOILS 1211 Wind Erosion - Severe 0.53 Acres Operation DisturbanceSOILS 1212 Compaction Prone 146.33 Acres Construction DisturbanceSOILS 1212 Compaction Prone 60.51 Acres Operation DisturbanceSOILS 1212 Corrosion Concrete 109.48 Acres Construction DisturbanceSOILS 1212 Corrosion Concrete 46.83 Acres Operation DisturbanceSOILS 1212 Corrosion Steel 194.53 Acres Construction DisturbanceSOILS 1212 Corrosion Steel 79.50 Acres Operation DisturbanceSOILS 1212 Hydric 0.33 Acres Construction DisturbanceSOILS 1212 Hydric 0.13 Acres Operation DisturbanceSOILS 1212 LRP 138.40 Acres Construction DisturbanceSOILS 1212 LRP 57.55 Acres Operation DisturbanceSOILS 1212 Prime Farmland 7.21 Acres Construction DisturbanceSOILS 1212 Prime Farmland 2.77 Acres Operation DisturbanceSOILS 1212 Shallow Bedrock 5.54 Acres Construction DisturbanceSOILS 1212 Shallow Bedrock 2.20 Acres Operation DisturbanceSOILS 1212 Shallow Excavations 153.68 Acres Construction DisturbanceSOILS 1212 Shallow Excavations 63.13 Acres Operation DisturbanceSOILS 1212 Shrink Swell 103.63 Acres Construction DisturbanceSOILS 1212 Shrink Swell 42.23 Acres Operation DisturbanceSOILS 1212 Small Commercial Buildings 187.32 Acres Construction DisturbanceSOILS 1212 Small Commercial Buildings 76.73 Acres Operation DisturbanceSOILS 1212 Water Erosion - Severe 45.34 Acres Construction DisturbanceSOILS 1212 Water Erosion - Severe 16.73 Acres Operation Disturbance

Page 232: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

SOILS 1212 Wind Erosion - Severe 0.00 Acres Construction DisturbanceSOILS 1212 Wind Erosion - Severe 0.00 Acres Operation DisturbanceSOILS 1214 Compaction Prone 24.35 Acres Construction DisturbanceSOILS 1214 Compaction Prone 5.88 Acres Operation DisturbanceSOILS 1214 Corrosion Concrete 8.37 Acres Construction DisturbanceSOILS 1214 Corrosion Concrete 1.92 Acres Operation DisturbanceSOILS 1214 Corrosion Steel 119.64 Acres Construction DisturbanceSOILS 1214 Corrosion Steel 27.65 Acres Operation DisturbanceSOILS 1214 Hydric 0.01 Acres Construction DisturbanceSOILS 1214 Hydric 0.00 Acres Operation DisturbanceSOILS 1214 LRP 16.08 Acres Construction DisturbanceSOILS 1214 LRP 3.91 Acres Operation DisturbanceSOILS 1214 Shallow Bedrock 5.18 Acres Construction DisturbanceSOILS 1214 Shallow Bedrock 1.19 Acres Operation DisturbanceSOILS 1214 Shallow Excavations 89.46 Acres Construction DisturbanceSOILS 1214 Shallow Excavations 20.83 Acres Operation DisturbanceSOILS 1214 Shrink Swell 10.86 Acres Construction DisturbanceSOILS 1214 Shrink Swell 2.79 Acres Operation DisturbanceSOILS 1214 Small Commercial Buildings 114.52 Acres Construction DisturbanceSOILS 1214 Small Commercial Buildings 26.58 Acres Operation DisturbanceSOILS 1214 Water Erosion - Severe 13.20 Acres Construction DisturbanceSOILS 1214 Water Erosion - Severe 3.40 Acres Operation DisturbanceSOILS 1214 Wind Erosion - Severe 1.29 Acres Construction DisturbanceSOILS 1214 Wind Erosion - Severe 0.22 Acres Operation DisturbanceSOILS 1215 Compaction Prone 30.24 Acres Construction DisturbanceSOILS 1215 Compaction Prone 6.82 Acres Operation DisturbanceSOILS 1215 Corrosion Concrete 1.29 Acres Construction DisturbanceSOILS 1215 Corrosion Concrete 0.35 Acres Operation DisturbanceSOILS 1215 Corrosion Steel 78.61 Acres Construction DisturbanceSOILS 1215 Corrosion Steel 17.32 Acres Operation DisturbanceSOILS 1215 LRP 26.09 Acres Construction DisturbanceSOILS 1215 LRP 5.87 Acres Operation DisturbanceSOILS 1215 Shallow Excavations 44.82 Acres Construction DisturbanceSOILS 1215 Shallow Excavations 10.09 Acres Operation DisturbanceSOILS 1215 Shrink Swell 25.63 Acres Construction DisturbanceSOILS 1215 Shrink Swell 5.74 Acres Operation DisturbanceSOILS 1215 Small Commercial Buildings 78.61 Acres Construction DisturbanceSOILS 1215 Small Commercial Buildings 17.32 Acres Operation DisturbanceSOILS 1215 Water Erosion - Severe 41.16 Acres Construction DisturbanceSOILS 1215 Water Erosion - Severe 9.20 Acres Operation DisturbanceSOILS 1215.05 Compaction Prone 62.37 Acres Construction DisturbanceSOILS 1215.05 Compaction Prone 18.94 Acres Operation DisturbanceSOILS 1215.05 Corrosion Concrete 40.31 Acres Construction DisturbanceSOILS 1215.05 Corrosion Concrete 12.34 Acres Operation DisturbanceSOILS 1215.05 Corrosion Steel 110.92 Acres Construction Disturbance

Page 233: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

SOILS 1215.05 Corrosion Steel 33.88 Acres Operation DisturbanceSOILS 1215.05 Hydric 0.00 Acres Construction DisturbanceSOILS 1215.05 Hydric 0.00 Acres Operation DisturbanceSOILS 1215.05 LRP 64.01 Acres Construction DisturbanceSOILS 1215.05 LRP 19.81 Acres Operation DisturbanceSOILS 1215.05 Prime Farmland 2.00 Acres Construction DisturbanceSOILS 1215.05 Prime Farmland 1.04 Acres Operation DisturbanceSOILS 1215.05 Shallow Bedrock 8.76 Acres Construction DisturbanceSOILS 1215.05 Shallow Bedrock 2.67 Acres Operation DisturbanceSOILS 1215.05 Shallow Excavations 76.37 Acres Construction DisturbanceSOILS 1215.05 Shallow Excavations 22.85 Acres Operation DisturbanceSOILS 1215.05 Shrink Swell 41.53 Acres Construction DisturbanceSOILS 1215.05 Shrink Swell 12.58 Acres Operation DisturbanceSOILS 1215.05 Small Commercial Buildings 108.54 Acres Construction DisturbanceSOILS 1215.05 Small Commercial Buildings 32.66 Acres Operation DisturbanceSOILS 1215.05 Water Erosion - Severe 35.23 Acres Construction DisturbanceSOILS 1215.05 Water Erosion - Severe 10.10 Acres Operation DisturbanceSOILS 1215.05 Wind Erosion - Severe 0.41 Acres Construction DisturbanceSOILS 1215.05 Wind Erosion - Severe 0.21 Acres Operation DisturbanceSOILS 1217.01 Compaction Prone 332.05 Acres Construction DisturbanceSOILS 1217.01 Compaction Prone 86.86 Acres Operation DisturbanceSOILS 1217.01 Corrosion Concrete 265.21 Acres Construction DisturbanceSOILS 1217.01 Corrosion Concrete 72.52 Acres Operation DisturbanceSOILS 1217.01 Corrosion Steel 720.65 Acres Construction DisturbanceSOILS 1217.01 Corrosion Steel 186.54 Acres Operation DisturbanceSOILS 1217.01 Hydric 1.13 Acres Construction DisturbanceSOILS 1217.01 Hydric 0.31 Acres Operation DisturbanceSOILS 1217.01 LRP 526.25 Acres Construction DisturbanceSOILS 1217.01 LRP 139.40 Acres Operation DisturbanceSOILS 1217.01 Shallow Bedrock 465.54 Acres Construction DisturbanceSOILS 1217.01 Shallow Bedrock 124.03 Acres Operation DisturbanceSOILS 1217.01 Shallow Excavations 405.94 Acres Construction DisturbanceSOILS 1217.01 Shallow Excavations 109.03 Acres Operation DisturbanceSOILS 1217.01 Shrink Swell 56.55 Acres Construction DisturbanceSOILS 1217.01 Shrink Swell 16.00 Acres Operation DisturbanceSOILS 1217.01 Small Commercial Buildings 421.58 Acres Construction DisturbanceSOILS 1217.01 Small Commercial Buildings 112.41 Acres Operation DisturbanceSOILS 1217.01 Water Erosion - Severe 68.03 Acres Construction DisturbanceSOILS 1217.01 Water Erosion - Severe 15.87 Acres Operation DisturbanceSOILS 1217.01 Wind Erosion - Severe 59.43 Acres Construction DisturbanceSOILS 1217.01 Wind Erosion - Severe 16.30 Acres Operation DisturbanceSOILS 1217.02 Compaction Prone 183.97 Acres Construction DisturbanceSOILS 1217.02 Compaction Prone 53.33 Acres Operation DisturbanceSOILS 1217.02 Corrosion Steel 111.07 Acres Construction DisturbanceSOILS 1217.02 Corrosion Steel 34.62 Acres Operation Disturbance

Page 234: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

SOILS 1217.02 Hydric 0.49 Acres Construction DisturbanceSOILS 1217.02 Hydric 0.14 Acres Operation DisturbanceSOILS 1217.02 LRP 10.14 Acres Construction DisturbanceSOILS 1217.02 LRP 3.77 Acres Operation DisturbanceSOILS 1217.02 Prime Farmland 9.22 Acres Construction DisturbanceSOILS 1217.02 Prime Farmland 2.51 Acres Operation DisturbanceSOILS 1217.02 Shallow Bedrock 147.29 Acres Construction DisturbanceSOILS 1217.02 Shallow Bedrock 43.10 Acres Operation DisturbanceSOILS 1217.02 Shallow Excavations 196.54 Acres Construction DisturbanceSOILS 1217.02 Shallow Excavations 57.77 Acres Operation DisturbanceSOILS 1217.02 Shrink Swell 1.39 Acres Construction DisturbanceSOILS 1217.02 Shrink Swell 0.56 Acres Operation DisturbanceSOILS 1217.02 Small Commercial Buildings 207.28 Acres Construction DisturbanceSOILS 1217.02 Small Commercial Buildings 61.40 Acres Operation DisturbanceSOILS 1217.02 Water Erosion - Severe 1.56 Acres Construction DisturbanceSOILS 1217.02 Water Erosion - Severe 0.45 Acres Operation DisturbanceSOILS 1217.051 Compaction Prone 85.36 Acres Construction DisturbanceSOILS 1217.051 Compaction Prone 22.75 Acres Operation DisturbanceSOILS 1217.051 Corrosion Steel 96.61 Acres Construction DisturbanceSOILS 1217.051 Corrosion Steel 25.02 Acres Operation DisturbanceSOILS 1217.051 Hydric 0.01 Acres Construction DisturbanceSOILS 1217.051 Hydric 0.01 Acres Operation DisturbanceSOILS 1217.051 LRP 61.59 Acres Construction DisturbanceSOILS 1217.051 LRP 15.63 Acres Operation DisturbanceSOILS 1217.051 Shallow Bedrock 91.91 Acres Construction DisturbanceSOILS 1217.051 Shallow Bedrock 23.70 Acres Operation DisturbanceSOILS 1217.051 Shallow Excavations 2.15 Acres Construction DisturbanceSOILS 1217.051 Shallow Excavations 0.97 Acres Operation DisturbanceSOILS 1217.051 Shrink Swell 11.57 Acres Construction DisturbanceSOILS 1217.051 Shrink Swell 3.02 Acres Operation DisturbanceSOILS 1217.051 Small Commercial Buildings 4.56 Acres Construction DisturbanceSOILS 1217.051 Small Commercial Buildings 2.05 Acres Operation DisturbanceSOILS 1217.051 Water Erosion - Severe 44.56 Acres Construction DisturbanceSOILS 1217.051 Water Erosion - Severe 11.35 Acres Operation DisturbanceSOILS 1217.052 Compaction Prone 38.38 Acres Construction DisturbanceSOILS 1217.052 Compaction Prone 14.13 Acres Operation DisturbanceSOILS 1217.052 Corrosion Steel 106.09 Acres Construction DisturbanceSOILS 1217.052 Corrosion Steel 37.96 Acres Operation DisturbanceSOILS 1217.052 LRP 46.93 Acres Construction DisturbanceSOILS 1217.052 LRP 16.75 Acres Operation DisturbanceSOILS 1217.052 Shallow Bedrock 87.57 Acres Construction DisturbanceSOILS 1217.052 Shallow Bedrock 31.51 Acres Operation DisturbanceSOILS 1217.052 Shrink Swell 7.88 Acres Construction DisturbanceSOILS 1217.052 Shrink Swell 3.17 Acres Operation DisturbanceSOILS 1217.052 Water Erosion - Severe 8.38 Acres Construction Disturbance

Page 235: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

SOILS 1217.052 Water Erosion - Severe 2.65 Acres Operation DisturbanceSOILS 1217.1 Compaction Prone 41.50 Acres Construction DisturbanceSOILS 1217.1 Compaction Prone 11.62 Acres Operation DisturbanceSOILS 1217.1 Corrosion Concrete 0.13 Acres Construction DisturbanceSOILS 1217.1 Corrosion Concrete 0.08 Acres Operation DisturbanceSOILS 1217.1 Corrosion Steel 190.55 Acres Construction DisturbanceSOILS 1217.1 Corrosion Steel 51.92 Acres Operation DisturbanceSOILS 1217.1 Hydric 0.86 Acres Construction DisturbanceSOILS 1217.1 Hydric 0.21 Acres Operation DisturbanceSOILS 1217.1 LRP 15.85 Acres Construction DisturbanceSOILS 1217.1 LRP 4.46 Acres Operation DisturbanceSOILS 1217.1 Prime Farmland 57.20 Acres Construction DisturbanceSOILS 1217.1 Prime Farmland 16.67 Acres Operation DisturbanceSOILS 1217.1 Shallow Bedrock 123.61 Acres Construction DisturbanceSOILS 1217.1 Shallow Bedrock 32.64 Acres Operation DisturbanceSOILS 1217.1 Shallow Excavations 208.47 Acres Construction DisturbanceSOILS 1217.1 Shallow Excavations 56.54 Acres Operation DisturbanceSOILS 1217.1 Small Commercial Buildings 233.64 Acres Construction DisturbanceSOILS 1217.1 Small Commercial Buildings 63.85 Acres Operation DisturbanceSOILS 1217.1 Wind Erosion - Severe 0.33 Acres Construction DisturbanceSOILS 1217.1 Wind Erosion - Severe 0.06 Acres Operation DisturbanceSOILS 1217.15 Compaction Prone 249.94 Acres Construction DisturbanceSOILS 1217.15 Compaction Prone 88.21 Acres Operation DisturbanceSOILS 1217.15 Corrosion Concrete 0.02 Acres Construction DisturbanceSOILS 1217.15 Corrosion Concrete 0.01 Acres Operation DisturbanceSOILS 1217.15 Corrosion Steel 272.25 Acres Construction DisturbanceSOILS 1217.15 Corrosion Steel 94.93 Acres Operation DisturbanceSOILS 1217.15 Hydric 3.40 Acres Construction DisturbanceSOILS 1217.15 Hydric 1.33 Acres Operation DisturbanceSOILS 1217.15 LRP 43.04 Acres Construction DisturbanceSOILS 1217.15 LRP 13.96 Acres Operation DisturbanceSOILS 1217.15 Prime Farmland 16.99 Acres Construction DisturbanceSOILS 1217.15 Prime Farmland 7.34 Acres Operation DisturbanceSOILS 1217.15 Shallow Bedrock 112.35 Acres Construction DisturbanceSOILS 1217.15 Shallow Bedrock 37.82 Acres Operation DisturbanceSOILS 1217.15 Shallow Excavations 286.55 Acres Construction DisturbanceSOILS 1217.15 Shallow Excavations 101.70 Acres Operation DisturbanceSOILS 1217.15 Shrink Swell 140.41 Acres Construction DisturbanceSOILS 1217.15 Shrink Swell 49.54 Acres Operation DisturbanceSOILS 1217.15 Small Commercial Buildings 304.58 Acres Construction DisturbanceSOILS 1217.15 Small Commercial Buildings 106.65 Acres Operation DisturbanceSOILS 1217.15 Water Erosion - Severe 73.60 Acres Construction DisturbanceSOILS 1217.15 Water Erosion - Severe 24.38 Acres Operation DisturbanceSOILS 1218 Compaction Prone 60.56 Acres Construction DisturbanceSOILS 1218 Compaction Prone 23.80 Acres Operation Disturbance

Page 236: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

SOILS 1218 Corrosion Steel 72.68 Acres Construction DisturbanceSOILS 1218 Corrosion Steel 28.56 Acres Operation DisturbanceSOILS 1218 LRP 36.34 Acres Construction DisturbanceSOILS 1218 LRP 14.28 Acres Operation DisturbanceSOILS 1218 Shallow Bedrock 72.68 Acres Construction DisturbanceSOILS 1218 Shallow Bedrock 28.56 Acres Operation DisturbanceSOILS 1218 Shrink Swell 24.23 Acres Construction DisturbanceSOILS 1218 Shrink Swell 9.52 Acres Operation DisturbanceSOILS 1219.1 Compaction Prone 3.68 Acres Construction DisturbanceSOILS 1219.1 Compaction Prone 0.74 Acres Operation DisturbanceSOILS 1219.1 Corrosion Steel 4.42 Acres Construction DisturbanceSOILS 1219.1 Corrosion Steel 0.89 Acres Operation DisturbanceSOILS 1219.1 LRP 2.21 Acres Construction DisturbanceSOILS 1219.1 LRP 0.44 Acres Operation DisturbanceSOILS 1219.1 Shallow Bedrock 4.42 Acres Construction DisturbanceSOILS 1219.1 Shallow Bedrock 0.89 Acres Operation DisturbanceSOILS 1219.1 Shrink Swell 1.47 Acres Construction DisturbanceSOILS 1219.1 Shrink Swell 0.30 Acres Operation DisturbanceSOILS 1219.2 Compaction Prone 106.05 Acres Construction DisturbanceSOILS 1219.2 Compaction Prone 35.65 Acres Operation DisturbanceSOILS 1219.2 Corrosion Steel 127.03 Acres Construction DisturbanceSOILS 1219.2 Corrosion Steel 42.73 Acres Operation DisturbanceSOILS 1219.2 LRP 63.76 Acres Construction DisturbanceSOILS 1219.2 LRP 21.43 Acres Operation DisturbanceSOILS 1219.2 Shallow Bedrock 127.03 Acres Construction DisturbanceSOILS 1219.2 Shallow Bedrock 42.73 Acres Operation DisturbanceSOILS 1219.2 Shrink Swell 42.12 Acres Construction DisturbanceSOILS 1219.2 Shrink Swell 14.19 Acres Operation DisturbanceSOILS 1219.2 Water Erosion - Severe 0.66 Acres Construction DisturbanceSOILS 1219.2 Water Erosion - Severe 0.17 Acres Operation DisturbanceSOILS 1219.3 Compaction Prone 5.49 Acres Construction DisturbanceSOILS 1219.3 Compaction Prone 1.16 Acres Operation DisturbanceSOILS 1219.3 Corrosion Steel 5.68 Acres Construction DisturbanceSOILS 1219.3 Corrosion Steel 1.20 Acres Operation DisturbanceSOILS 1219.3 LRP 3.80 Acres Construction DisturbanceSOILS 1219.3 LRP 0.80 Acres Operation DisturbanceSOILS 1219.3 Shallow Bedrock 5.68 Acres Construction DisturbanceSOILS 1219.3 Shallow Bedrock 1.20 Acres Operation DisturbanceSOILS 1219.3 Shrink Swell 1.04 Acres Construction DisturbanceSOILS 1219.3 Shrink Swell 0.22 Acres Operation DisturbanceSOILS 1219.3 Water Erosion - Severe 2.56 Acres Construction DisturbanceSOILS 1219.3 Water Erosion - Severe 0.54 Acres Operation DisturbanceSOILS 1219.4 Compaction Prone 4.92 Acres Construction DisturbanceSOILS 1219.4 Compaction Prone 2.58 Acres Operation DisturbanceSOILS 1219.4 Corrosion Steel 7.23 Acres Construction Disturbance

Page 237: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

SOILS 1219.4 Corrosion Steel 3.41 Acres Operation DisturbanceSOILS 1219.4 LRP 1.68 Acres Construction DisturbanceSOILS 1219.4 LRP 0.72 Acres Operation DisturbanceSOILS 1219.4 Shallow Bedrock 5.16 Acres Construction DisturbanceSOILS 1219.4 Shallow Bedrock 2.41 Acres Operation DisturbanceSOILS 1219.4 Shallow Excavations 1.93 Acres Construction DisturbanceSOILS 1219.4 Shallow Excavations 1.04 Acres Operation DisturbanceSOILS 1219.4 Shrink Swell 0.04 Acres Construction DisturbanceSOILS 1219.4 Shrink Swell 0.02 Acres Operation DisturbanceSOILS 1219.4 Small Commercial Buildings 4.13 Acres Construction DisturbanceSOILS 1219.4 Small Commercial Buildings 2.23 Acres Operation DisturbanceSOILS 1219.4 Water Erosion - Severe 0.18 Acres Construction DisturbanceSOILS 1219.4 Water Erosion - Severe 0.08 Acres Operation DisturbanceSOILS 1219.45 Compaction Prone 1.67 Acres Construction DisturbanceSOILS 1219.45 Compaction Prone 0.64 Acres Operation DisturbanceSOILS 1219.45 Corrosion Steel 13.37 Acres Construction DisturbanceSOILS 1219.45 Corrosion Steel 5.10 Acres Operation DisturbanceSOILS 1219.45 LRP 5.01 Acres Construction DisturbanceSOILS 1219.45 LRP 1.91 Acres Operation DisturbanceSOILS 1219.45 Shallow Bedrock 10.03 Acres Construction DisturbanceSOILS 1219.45 Shallow Bedrock 3.82 Acres Operation DisturbanceSOILS 1219.5 Compaction Prone 87.32 Acres Construction DisturbanceSOILS 1219.5 Compaction Prone 30.32 Acres Operation DisturbanceSOILS 1219.5 Corrosion Steel 111.19 Acres Construction DisturbanceSOILS 1219.5 Corrosion Steel 38.06 Acres Operation DisturbanceSOILS 1219.5 LRP 58.12 Acres Construction DisturbanceSOILS 1219.5 LRP 20.06 Acres Operation DisturbanceSOILS 1219.5 Shallow Bedrock 108.20 Acres Construction DisturbanceSOILS 1219.5 Shallow Bedrock 37.16 Acres Operation DisturbanceSOILS 1219.5 Shrink Swell 29.50 Acres Construction DisturbanceSOILS 1219.5 Shrink Swell 10.18 Acres Operation DisturbanceSOILS 1219.5 Water Erosion - Severe 10.72 Acres Construction DisturbanceSOILS 1219.5 Water Erosion - Severe 3.94 Acres Operation DisturbanceSOILS 1219.6 Compaction Prone 9.14 Acres Construction DisturbanceSOILS 1219.6 Compaction Prone 2.26 Acres Operation DisturbanceSOILS 1219.6 Corrosion Steel 34.77 Acres Construction DisturbanceSOILS 1219.6 Corrosion Steel 8.38 Acres Operation DisturbanceSOILS 1219.6 LRP 13.89 Acres Construction DisturbanceSOILS 1219.6 LRP 3.36 Acres Operation DisturbanceSOILS 1219.6 Shallow Bedrock 27.77 Acres Construction DisturbanceSOILS 1219.6 Shallow Bedrock 6.71 Acres Operation DisturbanceSOILS 1219.6 Shrink Swell 2.25 Acres Construction DisturbanceSOILS 1219.6 Shrink Swell 0.57 Acres Operation DisturbanceSOILS 1220 Compaction Prone 808.61 Acres Construction DisturbanceSOILS 1220 Compaction Prone 209.62 Acres Operation Disturbance

Page 238: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

SOILS 1220 Corrosion Concrete 558.69 Acres Construction DisturbanceSOILS 1220 Corrosion Concrete 142.99 Acres Operation DisturbanceSOILS 1220 Corrosion Steel 1368.99 Acres Construction DisturbanceSOILS 1220 Corrosion Steel 332.82 Acres Operation DisturbanceSOILS 1220 Hydric 1.57 Acres Construction DisturbanceSOILS 1220 Hydric 0.39 Acres Operation DisturbanceSOILS 1220 LRP 877.26 Acres Construction DisturbanceSOILS 1220 LRP 217.01 Acres Operation DisturbanceSOILS 1220 Prime Farmland 209.81 Acres Construction DisturbanceSOILS 1220 Prime Farmland 45.65 Acres Operation DisturbanceSOILS 1220 Shallow Bedrock 614.21 Acres Construction DisturbanceSOILS 1220 Shallow Bedrock 132.33 Acres Operation DisturbanceSOILS 1220 Shallow Excavations 1288.24 Acres Construction DisturbanceSOILS 1220 Shallow Excavations 298.56 Acres Operation DisturbanceSOILS 1220 Shrink Swell 314.46 Acres Construction DisturbanceSOILS 1220 Shrink Swell 79.18 Acres Operation DisturbanceSOILS 1220 Small Commercial Buildings 1482.95 Acres Construction DisturbanceSOILS 1220 Small Commercial Buildings 345.02 Acres Operation DisturbanceSOILS 1220 Water Erosion - Severe 220.33 Acres Construction DisturbanceSOILS 1220 Water Erosion - Severe 60.77 Acres Operation DisturbanceSOILS 1220 Wind Erosion - Severe 13.36 Acres Construction DisturbanceSOILS 1220 Wind Erosion - Severe 2.79 Acres Operation DisturbanceSOILS 1222.05 Compaction Prone 286.79 Acres Construction DisturbanceSOILS 1222.05 Compaction Prone 49.14 Acres Operation DisturbanceSOILS 1222.05 Corrosion Concrete 113.87 Acres Construction DisturbanceSOILS 1222.05 Corrosion Concrete 19.70 Acres Operation DisturbanceSOILS 1222.05 Corrosion Steel 403.46 Acres Construction DisturbanceSOILS 1222.05 Corrosion Steel 70.40 Acres Operation DisturbanceSOILS 1222.05 Hydric 8.37 Acres Construction DisturbanceSOILS 1222.05 Hydric 1.38 Acres Operation DisturbanceSOILS 1222.05 LRP 359.23 Acres Construction DisturbanceSOILS 1222.05 LRP 62.90 Acres Operation DisturbanceSOILS 1222.05 Prime Farmland 25.97 Acres Construction DisturbanceSOILS 1222.05 Prime Farmland 4.22 Acres Operation DisturbanceSOILS 1222.05 Shallow Bedrock 13.20 Acres Construction DisturbanceSOILS 1222.05 Shallow Bedrock 2.98 Acres Operation DisturbanceSOILS 1222.05 Shallow Excavations 268.04 Acres Construction DisturbanceSOILS 1222.05 Shallow Excavations 47.36 Acres Operation DisturbanceSOILS 1222.05 Shrink Swell 44.38 Acres Construction DisturbanceSOILS 1222.05 Shrink Swell 7.69 Acres Operation DisturbanceSOILS 1222.05 Small Commercial Buildings 352.87 Acres Construction DisturbanceSOILS 1222.05 Small Commercial Buildings 61.11 Acres Operation DisturbanceSOILS 1222.05 Water Erosion - Severe 74.90 Acres Construction DisturbanceSOILS 1222.05 Water Erosion - Severe 13.02 Acres Operation DisturbanceSOILS 1222.05 Wind Erosion - Severe 0.02 Acres Construction Disturbance

Page 239: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

SOILS 1222.05 Wind Erosion - Severe 0.01 Acres Operation DisturbanceSOILS 1222.3 Compaction Prone 31.30 Acres Construction DisturbanceSOILS 1222.3 Compaction Prone 7.93 Acres Operation DisturbanceSOILS 1222.3 Corrosion Concrete 11.34 Acres Construction DisturbanceSOILS 1222.3 Corrosion Concrete 3.34 Acres Operation DisturbanceSOILS 1222.3 Corrosion Steel 162.12 Acres Construction DisturbanceSOILS 1222.3 Corrosion Steel 40.81 Acres Operation DisturbanceSOILS 1222.3 Hydric 0.15 Acres Construction DisturbanceSOILS 1222.3 Hydric 0.05 Acres Operation DisturbanceSOILS 1222.3 LRP 57.41 Acres Construction DisturbanceSOILS 1222.3 LRP 14.98 Acres Operation DisturbanceSOILS 1222.3 Prime Farmland 23.93 Acres Construction DisturbanceSOILS 1222.3 Prime Farmland 6.08 Acres Operation DisturbanceSOILS 1222.3 Shallow Bedrock 14.26 Acres Construction DisturbanceSOILS 1222.3 Shallow Bedrock 3.17 Acres Operation DisturbanceSOILS 1222.3 Shallow Excavations 131.02 Acres Construction DisturbanceSOILS 1222.3 Shallow Excavations 33.56 Acres Operation DisturbanceSOILS 1222.3 Shrink Swell 9.65 Acres Construction DisturbanceSOILS 1222.3 Shrink Swell 2.64 Acres Operation DisturbanceSOILS 1222.3 Small Commercial Buildings 142.22 Acres Construction DisturbanceSOILS 1222.3 Small Commercial Buildings 36.44 Acres Operation DisturbanceSOILS 1222.3 Water Erosion - Severe 4.42 Acres Construction DisturbanceSOILS 1222.3 Water Erosion - Severe 1.19 Acres Operation DisturbanceSOILS 1223 Compaction Prone 7.63 Acres Construction DisturbanceSOILS 1223 Compaction Prone 2.61 Acres Operation DisturbanceSOILS 1223 Corrosion Concrete 13.00 Acres Construction DisturbanceSOILS 1223 Corrosion Concrete 4.52 Acres Operation DisturbanceSOILS 1223 Corrosion Steel 153.89 Acres Construction DisturbanceSOILS 1223 Corrosion Steel 38.76 Acres Operation DisturbanceSOILS 1223 Hydric 0.71 Acres Construction DisturbanceSOILS 1223 Hydric 0.26 Acres Operation DisturbanceSOILS 1223 LRP 24.34 Acres Construction DisturbanceSOILS 1223 LRP 8.19 Acres Operation DisturbanceSOILS 1223 Prime Farmland 73.70 Acres Construction DisturbanceSOILS 1223 Prime Farmland 16.66 Acres Operation DisturbanceSOILS 1223 Shallow Bedrock 58.98 Acres Construction DisturbanceSOILS 1223 Shallow Bedrock 13.44 Acres Operation DisturbanceSOILS 1223 Shallow Excavations 120.26 Acres Construction DisturbanceSOILS 1223 Shallow Excavations 30.26 Acres Operation DisturbanceSOILS 1223 Shrink Swell 0.56 Acres Construction DisturbanceSOILS 1223 Shrink Swell 0.21 Acres Operation DisturbanceSOILS 1223 Small Commercial Buildings 127.73 Acres Construction DisturbanceSOILS 1223 Small Commercial Buildings 32.73 Acres Operation DisturbanceSOILS 1223 Water Erosion - Severe 1.54 Acres Construction DisturbanceSOILS 1223 Water Erosion - Severe 0.63 Acres Operation Disturbance

Page 240: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

SOILS 1225.2 Compaction Prone 135.61 Acres Construction DisturbanceSOILS 1225.2 Compaction Prone 27.19 Acres Operation DisturbanceSOILS 1225.2 Corrosion Concrete 51.22 Acres Construction DisturbanceSOILS 1225.2 Corrosion Concrete 10.29 Acres Operation DisturbanceSOILS 1225.2 Corrosion Steel 424.44 Acres Construction DisturbanceSOILS 1225.2 Corrosion Steel 86.61 Acres Operation DisturbanceSOILS 1225.2 Hydric 0.72 Acres Construction DisturbanceSOILS 1225.2 Hydric 0.19 Acres Operation DisturbanceSOILS 1225.2 LRP 231.73 Acres Construction DisturbanceSOILS 1225.2 LRP 47.19 Acres Operation DisturbanceSOILS 1225.2 Prime Farmland 5.66 Acres Construction DisturbanceSOILS 1225.2 Prime Farmland 1.13 Acres Operation DisturbanceSOILS 1225.2 Shallow Bedrock 147.73 Acres Construction DisturbanceSOILS 1225.2 Shallow Bedrock 29.58 Acres Operation DisturbanceSOILS 1225.2 Shallow Excavations 314.04 Acres Construction DisturbanceSOILS 1225.2 Shallow Excavations 64.41 Acres Operation DisturbanceSOILS 1225.2 Shrink Swell 26.25 Acres Construction DisturbanceSOILS 1225.2 Shrink Swell 5.58 Acres Operation DisturbanceSOILS 1225.2 Small Commercial Buildings 337.21 Acres Construction DisturbanceSOILS 1225.2 Small Commercial Buildings 69.62 Acres Operation DisturbanceSOILS 1225.2 Water Erosion - Severe 27.41 Acres Construction DisturbanceSOILS 1225.2 Water Erosion - Severe 5.82 Acres Operation DisturbanceSOILS 1225.2 Wind Erosion - Severe 2.09 Acres Construction DisturbanceSOILS 1225.2 Wind Erosion - Severe 0.43 Acres Operation DisturbanceSOILS 1270 Compaction Prone 91.73 Acres Construction DisturbanceSOILS 1270 Compaction Prone 18.43 Acres Operation DisturbanceSOILS 1270 Corrosion Concrete 42.77 Acres Construction DisturbanceSOILS 1270 Corrosion Concrete 8.56 Acres Operation DisturbanceSOILS 1270 Corrosion Steel 121.55 Acres Construction DisturbanceSOILS 1270 Corrosion Steel 24.17 Acres Operation DisturbanceSOILS 1270 Hydric 5.06 Acres Construction DisturbanceSOILS 1270 Hydric 1.30 Acres Operation DisturbanceSOILS 1270 LRP 125.87 Acres Construction DisturbanceSOILS 1270 LRP 24.80 Acres Operation DisturbanceSOILS 1270 Prime Farmland 24.61 Acres Construction DisturbanceSOILS 1270 Prime Farmland 4.21 Acres Operation DisturbanceSOILS 1270 Shallow Bedrock 0.11 Acres Construction DisturbanceSOILS 1270 Shallow Bedrock 0.03 Acres Operation DisturbanceSOILS 1270 Shallow Excavations 96.03 Acres Construction DisturbanceSOILS 1270 Shallow Excavations 19.27 Acres Operation DisturbanceSOILS 1270 Shrink Swell 25.27 Acres Construction DisturbanceSOILS 1270 Shrink Swell 4.79 Acres Operation DisturbanceSOILS 1270 Small Commercial Buildings 132.50 Acres Construction DisturbanceSOILS 1270 Small Commercial Buildings 25.88 Acres Operation DisturbanceSOILS 1270 Water Erosion - Severe 44.01 Acres Construction Disturbance

Page 241: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

SOILS 1270 Water Erosion - Severe 8.47 Acres Operation DisturbanceSOILS 1310 Compaction Prone 363.67 Acres Construction DisturbanceSOILS 1310 Compaction Prone 128.56 Acres Operation DisturbanceSOILS 1310 Corrosion Concrete 6.49 Acres Construction DisturbanceSOILS 1310 Corrosion Concrete 2.18 Acres Operation DisturbanceSOILS 1310 Corrosion Steel 478.69 Acres Construction DisturbanceSOILS 1310 Corrosion Steel 158.90 Acres Operation DisturbanceSOILS 1310 Hydric 17.10 Acres Construction DisturbanceSOILS 1310 Hydric 6.55 Acres Operation DisturbanceSOILS 1310 LRP 154.78 Acres Construction DisturbanceSOILS 1310 LRP 46.05 Acres Operation DisturbanceSOILS 1310 Prime Farmland 27.79 Acres Construction DisturbanceSOILS 1310 Prime Farmland 11.55 Acres Operation DisturbanceSOILS 1310 Shallow Bedrock 179.09 Acres Construction DisturbanceSOILS 1310 Shallow Bedrock 55.43 Acres Operation DisturbanceSOILS 1310 Shallow Excavations 362.66 Acres Construction DisturbanceSOILS 1310 Shallow Excavations 126.32 Acres Operation DisturbanceSOILS 1310 Shrink Swell 159.71 Acres Construction DisturbanceSOILS 1310 Shrink Swell 52.44 Acres Operation DisturbanceSOILS 1310 Small Commercial Buildings 379.21 Acres Construction DisturbanceSOILS 1310 Small Commercial Buildings 135.83 Acres Operation DisturbanceSOILS 1310 Water Erosion - Severe 107.74 Acres Construction DisturbanceSOILS 1310 Water Erosion - Severe 33.19 Acres Operation DisturbanceSOILS 1310 Wind Erosion - Severe 8.36 Acres Construction DisturbanceSOILS 1310 Wind Erosion - Severe 2.65 Acres Operation DisturbanceSOILS 1320.05 Compaction Prone 107.93 Acres Construction DisturbanceSOILS 1320.05 Compaction Prone 18.44 Acres Operation DisturbanceSOILS 1320.05 Corrosion Concrete 126.09 Acres Construction DisturbanceSOILS 1320.05 Corrosion Concrete 21.67 Acres Operation DisturbanceSOILS 1320.05 Corrosion Steel 339.63 Acres Construction DisturbanceSOILS 1320.05 Corrosion Steel 57.49 Acres Operation DisturbanceSOILS 1320.05 Hydric 2.54 Acres Construction DisturbanceSOILS 1320.05 Hydric 0.53 Acres Operation DisturbanceSOILS 1320.05 LRP 158.19 Acres Construction DisturbanceSOILS 1320.05 LRP 27.15 Acres Operation DisturbanceSOILS 1320.05 Prime Farmland 80.11 Acres Construction DisturbanceSOILS 1320.05 Prime Farmland 14.32 Acres Operation DisturbanceSOILS 1320.05 Shallow Bedrock 95.90 Acres Construction DisturbanceSOILS 1320.05 Shallow Bedrock 15.26 Acres Operation DisturbanceSOILS 1320.05 Shallow Excavations 160.95 Acres Construction DisturbanceSOILS 1320.05 Shallow Excavations 27.79 Acres Operation DisturbanceSOILS 1320.05 Shrink Swell 38.80 Acres Construction DisturbanceSOILS 1320.05 Shrink Swell 7.17 Acres Operation DisturbanceSOILS 1320.05 Small Commercial Buildings 145.67 Acres Construction DisturbanceSOILS 1320.05 Small Commercial Buildings 24.84 Acres Operation Disturbance

Page 242: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

SOILS 1320.05 Water Erosion - Severe 0.37 Acres Construction DisturbanceSOILS 1320.05 Water Erosion - Severe 0.05 Acres Operation DisturbanceSOILS 1320.05 Wind Erosion - Severe 33.46 Acres Construction DisturbanceSOILS 1320.05 Wind Erosion - Severe 6.60 Acres Operation DisturbanceSOILS 1320.15 Compaction Prone 271.53 Acres Construction DisturbanceSOILS 1320.15 Compaction Prone 104.23 Acres Operation DisturbanceSOILS 1320.15 Corrosion Concrete 2.38 Acres Construction DisturbanceSOILS 1320.15 Corrosion Concrete 1.03 Acres Operation DisturbanceSOILS 1320.15 Corrosion Steel 268.71 Acres Construction DisturbanceSOILS 1320.15 Corrosion Steel 104.73 Acres Operation DisturbanceSOILS 1320.15 Hydric 3.44 Acres Construction DisturbanceSOILS 1320.15 Hydric 1.64 Acres Operation DisturbanceSOILS 1320.15 LRP 36.49 Acres Construction DisturbanceSOILS 1320.15 LRP 15.49 Acres Operation DisturbanceSOILS 1320.15 Prime Farmland 14.27 Acres Construction DisturbanceSOILS 1320.15 Prime Farmland 7.23 Acres Operation DisturbanceSOILS 1320.15 Shallow Bedrock 50.69 Acres Construction DisturbanceSOILS 1320.15 Shallow Bedrock 20.77 Acres Operation DisturbanceSOILS 1320.15 Shallow Excavations 314.15 Acres Construction DisturbanceSOILS 1320.15 Shallow Excavations 119.51 Acres Operation DisturbanceSOILS 1320.15 Shrink Swell 159.84 Acres Construction DisturbanceSOILS 1320.15 Shrink Swell 65.80 Acres Operation DisturbanceSOILS 1320.15 Small Commercial Buildings 320.24 Acres Construction DisturbanceSOILS 1320.15 Small Commercial Buildings 122.33 Acres Operation DisturbanceSOILS 1320.15 Water Erosion - Severe 62.70 Acres Construction DisturbanceSOILS 1320.15 Water Erosion - Severe 23.30 Acres Operation DisturbanceSOILS 1320.2 Compaction Prone 66.43 Acres Construction DisturbanceSOILS 1320.2 Compaction Prone 24.25 Acres Operation DisturbanceSOILS 1320.2 Corrosion Steel 59.30 Acres Construction DisturbanceSOILS 1320.2 Corrosion Steel 22.60 Acres Operation DisturbanceSOILS 1320.2 LRP 0.00 Acres Construction DisturbanceSOILS 1320.2 LRP 0.00 Acres Operation DisturbanceSOILS 1320.2 Prime Farmland 5.65 Acres Construction DisturbanceSOILS 1320.2 Prime Farmland 2.52 Acres Operation DisturbanceSOILS 1320.2 Shallow Bedrock 29.59 Acres Construction DisturbanceSOILS 1320.2 Shallow Bedrock 10.98 Acres Operation DisturbanceSOILS 1320.2 Shallow Excavations 90.48 Acres Construction DisturbanceSOILS 1320.2 Shallow Excavations 34.07 Acres Operation DisturbanceSOILS 1320.2 Shrink Swell 38.77 Acres Construction DisturbanceSOILS 1320.2 Shrink Swell 14.67 Acres Operation DisturbanceSOILS 1320.2 Small Commercial Buildings 90.48 Acres Construction DisturbanceSOILS 1320.2 Small Commercial Buildings 34.07 Acres Operation DisturbanceSOILS 1320.2 Water Erosion - Severe 2.75 Acres Construction DisturbanceSOILS 1320.2 Water Erosion - Severe 1.84 Acres Operation DisturbanceSOILS 1320.21 Compaction Prone 2.14 Acres Construction Disturbance

Page 243: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

SOILS 1320.21 Compaction Prone 0.71 Acres Operation DisturbanceSOILS 1320.21 Corrosion Steel 4.09 Acres Construction DisturbanceSOILS 1320.21 Corrosion Steel 1.44 Acres Operation DisturbanceSOILS 1320.21 Shallow Excavations 4.09 Acres Construction DisturbanceSOILS 1320.21 Shallow Excavations 1.44 Acres Operation DisturbanceSOILS 1320.21 Shrink Swell 0.58 Acres Construction DisturbanceSOILS 1320.21 Shrink Swell 0.20 Acres Operation DisturbanceSOILS 1320.21 Small Commercial Buildings 4.09 Acres Construction DisturbanceSOILS 1320.21 Small Commercial Buildings 1.44 Acres Operation DisturbanceSOILS 1324 Compaction Prone 18.26 Acres Construction DisturbanceSOILS 1324 Compaction Prone 7.27 Acres Operation DisturbanceSOILS 1324 Corrosion Steel 25.12 Acres Construction DisturbanceSOILS 1324 Corrosion Steel 10.35 Acres Operation DisturbanceSOILS 1324 LRP 12.09 Acres Construction DisturbanceSOILS 1324 LRP 4.93 Acres Operation DisturbanceSOILS 1324 Shallow Bedrock 24.18 Acres Construction DisturbanceSOILS 1324 Shallow Bedrock 9.87 Acres Operation DisturbanceSOILS 1324 Shrink Swell 7.11 Acres Construction DisturbanceSOILS 1324 Shrink Swell 2.81 Acres Operation DisturbanceSOILS 1324.2 Compaction Prone 20.00 Acres Construction DisturbanceSOILS 1324.2 Compaction Prone 7.36 Acres Operation DisturbanceSOILS 1324.2 Corrosion Steel 27.42 Acres Construction DisturbanceSOILS 1324.2 Corrosion Steel 10.47 Acres Operation DisturbanceSOILS 1324.2 LRP 13.21 Acres Construction DisturbanceSOILS 1324.2 LRP 4.99 Acres Operation DisturbanceSOILS 1324.2 Shallow Bedrock 26.41 Acres Construction DisturbanceSOILS 1324.2 Shallow Bedrock 9.98 Acres Operation DisturbanceSOILS 1324.2 Shrink Swell 7.80 Acres Construction DisturbanceSOILS 1324.2 Shrink Swell 2.85 Acres Operation DisturbanceSOILS 1324.4 Compaction Prone 24.15 Acres Construction DisturbanceSOILS 1324.4 Compaction Prone 7.44 Acres Operation DisturbanceSOILS 1324.4 Corrosion Steel 32.90 Acres Construction DisturbanceSOILS 1324.4 Corrosion Steel 10.59 Acres Operation DisturbanceSOILS 1324.4 LRP 15.88 Acres Construction DisturbanceSOILS 1324.4 LRP 5.05 Acres Operation DisturbanceSOILS 1324.4 Shallow Bedrock 31.75 Acres Construction DisturbanceSOILS 1324.4 Shallow Bedrock 10.10 Acres Operation DisturbanceSOILS 1324.4 Shrink Swell 9.43 Acres Construction DisturbanceSOILS 1324.4 Shrink Swell 2.88 Acres Operation DisturbanceSOILS 1325 Compaction Prone 7.94 Acres Construction DisturbanceSOILS 1325 Compaction Prone 3.22 Acres Operation DisturbanceSOILS 1325 Corrosion Steel 63.51 Acres Construction DisturbanceSOILS 1325 Corrosion Steel 25.74 Acres Operation DisturbanceSOILS 1325 LRP 23.82 Acres Construction DisturbanceSOILS 1325 LRP 9.65 Acres Operation Disturbance

Page 244: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

SOILS 1325 Shallow Bedrock 47.63 Acres Construction DisturbanceSOILS 1325 Shallow Bedrock 19.30 Acres Operation DisturbanceSOILS 1325.1 Compaction Prone 125.44 Acres Construction DisturbanceSOILS 1325.1 Compaction Prone 27.25 Acres Operation DisturbanceSOILS 1325.1 Corrosion Concrete 37.62 Acres Construction DisturbanceSOILS 1325.1 Corrosion Concrete 9.18 Acres Operation DisturbanceSOILS 1325.1 Corrosion Steel 328.79 Acres Construction DisturbanceSOILS 1325.1 Corrosion Steel 70.46 Acres Operation DisturbanceSOILS 1325.1 Hydric 8.59 Acres Construction DisturbanceSOILS 1325.1 Hydric 2.05 Acres Operation DisturbanceSOILS 1325.1 LRP 243.58 Acres Construction DisturbanceSOILS 1325.1 LRP 53.16 Acres Operation DisturbanceSOILS 1325.1 Shallow Bedrock 207.57 Acres Construction DisturbanceSOILS 1325.1 Shallow Bedrock 44.25 Acres Operation DisturbanceSOILS 1325.1 Shrink Swell 14.56 Acres Construction DisturbanceSOILS 1325.1 Shrink Swell 3.06 Acres Operation DisturbanceSOILS 1325.1 Water Erosion - Severe 15.15 Acres Construction DisturbanceSOILS 1325.1 Water Erosion - Severe 3.37 Acres Operation DisturbanceSOILS 1325.1 Wind Erosion - Severe 1.72 Acres Construction DisturbanceSOILS 1325.1 Wind Erosion - Severe 0.41 Acres Operation DisturbanceSOILS 1325.2 Compaction Prone 7.08 Acres Construction DisturbanceSOILS 1325.2 Compaction Prone 2.56 Acres Operation DisturbanceSOILS 1325.2 Corrosion Steel 29.87 Acres Construction DisturbanceSOILS 1325.2 Corrosion Steel 11.18 Acres Operation DisturbanceSOILS 1325.2 LRP 11.61 Acres Construction DisturbanceSOILS 1325.2 LRP 4.36 Acres Operation DisturbanceSOILS 1325.2 Shallow Bedrock 23.39 Acres Construction DisturbanceSOILS 1325.2 Shallow Bedrock 8.76 Acres Operation DisturbanceSOILS 1325.2 Shallow Excavations 0.35 Acres Construction DisturbanceSOILS 1325.2 Shallow Excavations 0.06 Acres Operation DisturbanceSOILS 1325.2 Shrink Swell 1.41 Acres Construction DisturbanceSOILS 1325.2 Shrink Swell 0.51 Acres Operation DisturbanceSOILS 1325.2 Small Commercial Buildings 0.40 Acres Construction DisturbanceSOILS 1325.2 Small Commercial Buildings 0.08 Acres Operation DisturbanceSOILS 1330.1 Compaction Prone 599.81 Acres Construction DisturbanceSOILS 1330.1 Compaction Prone 148.37 Acres Operation DisturbanceSOILS 1330.1 Corrosion Concrete 190.40 Acres Construction DisturbanceSOILS 1330.1 Corrosion Concrete 53.73 Acres Operation DisturbanceSOILS 1330.1 Corrosion Steel 794.56 Acres Construction DisturbanceSOILS 1330.1 Corrosion Steel 207.61 Acres Operation DisturbanceSOILS 1330.1 Hydric 17.97 Acres Construction DisturbanceSOILS 1330.1 Hydric 5.38 Acres Operation DisturbanceSOILS 1330.1 LRP 682.09 Acres Construction DisturbanceSOILS 1330.1 LRP 176.63 Acres Operation DisturbanceSOILS 1330.1 Prime Farmland 173.40 Acres Construction Disturbance

Page 245: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

SOILS 1330.1 Prime Farmland 40.80 Acres Operation DisturbanceSOILS 1330.1 Shallow Bedrock 217.74 Acres Construction DisturbanceSOILS 1330.1 Shallow Bedrock 62.89 Acres Operation DisturbanceSOILS 1330.1 Shallow Excavations 497.92 Acres Construction DisturbanceSOILS 1330.1 Shallow Excavations 137.79 Acres Operation DisturbanceSOILS 1330.1 Shrink Swell 86.08 Acres Construction DisturbanceSOILS 1330.1 Shrink Swell 19.68 Acres Operation DisturbanceSOILS 1330.1 Small Commercial Buildings 715.21 Acres Construction DisturbanceSOILS 1330.1 Small Commercial Buildings 189.92 Acres Operation DisturbanceSOILS 1330.1 Water Erosion - Severe 202.70 Acres Construction DisturbanceSOILS 1330.1 Water Erosion - Severe 48.92 Acres Operation DisturbanceSOILS 1330.1 Wind Erosion - Severe 0.56 Acres Construction DisturbanceSOILS 1330.1 Wind Erosion - Severe 0.19 Acres Operation DisturbanceSOILS 1340 Compaction Prone 79.26 Acres Construction DisturbanceSOILS 1340 Compaction Prone 14.10 Acres Operation DisturbanceSOILS 1340 Corrosion Concrete 33.09 Acres Construction DisturbanceSOILS 1340 Corrosion Concrete 6.57 Acres Operation DisturbanceSOILS 1340 Corrosion Steel 221.81 Acres Construction DisturbanceSOILS 1340 Corrosion Steel 43.66 Acres Operation DisturbanceSOILS 1340 Hydric 19.67 Acres Construction DisturbanceSOILS 1340 Hydric 3.96 Acres Operation DisturbanceSOILS 1340 LRP 65.99 Acres Construction DisturbanceSOILS 1340 LRP 14.88 Acres Operation DisturbanceSOILS 1340 Prime Farmland 92.10 Acres Construction DisturbanceSOILS 1340 Prime Farmland 20.79 Acres Operation DisturbanceSOILS 1340 Shallow Bedrock 61.45 Acres Construction DisturbanceSOILS 1340 Shallow Bedrock 11.43 Acres Operation DisturbanceSOILS 1340 Shallow Excavations 129.42 Acres Construction DisturbanceSOILS 1340 Shallow Excavations 23.42 Acres Operation DisturbanceSOILS 1340 Shrink Swell 29.36 Acres Construction DisturbanceSOILS 1340 Shrink Swell 6.21 Acres Operation DisturbanceSOILS 1340 Small Commercial Buildings 183.38 Acres Construction DisturbanceSOILS 1340 Small Commercial Buildings 34.92 Acres Operation DisturbanceSOILS 1350 Compaction Prone 47.52 Acres Construction DisturbanceSOILS 1350 Compaction Prone 18.57 Acres Operation DisturbanceSOILS 1350 Corrosion Steel 144.08 Acres Construction DisturbanceSOILS 1350 Corrosion Steel 53.26 Acres Operation DisturbanceSOILS 1350 LRP 7.42 Acres Construction DisturbanceSOILS 1350 LRP 2.39 Acres Operation DisturbanceSOILS 1350 Prime Farmland 51.07 Acres Construction DisturbanceSOILS 1350 Prime Farmland 21.12 Acres Operation DisturbanceSOILS 1350 Shallow Bedrock 62.02 Acres Construction DisturbanceSOILS 1350 Shallow Bedrock 20.43 Acres Operation DisturbanceSOILS 1350 Shallow Excavations 103.17 Acres Construction DisturbanceSOILS 1350 Shallow Excavations 36.13 Acres Operation Disturbance

Page 246: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

SOILS 1350 Shrink Swell 3.00 Acres Construction DisturbanceSOILS 1350 Shrink Swell 1.16 Acres Operation DisturbanceSOILS 1350 Small Commercial Buildings 105.35 Acres Construction DisturbanceSOILS 1350 Small Commercial Buildings 37.15 Acres Operation DisturbanceSOILS 1360 Compaction Prone 20.53 Acres Construction DisturbanceSOILS 1360 Compaction Prone 4.29 Acres Operation DisturbanceSOILS 1360 Corrosion Concrete 4.93 Acres Construction DisturbanceSOILS 1360 Corrosion Concrete 1.12 Acres Operation DisturbanceSOILS 1360 Corrosion Steel 299.09 Acres Construction DisturbanceSOILS 1360 Corrosion Steel 68.82 Acres Operation DisturbanceSOILS 1360 LRP 66.69 Acres Construction DisturbanceSOILS 1360 LRP 15.48 Acres Operation DisturbanceSOILS 1360 Prime Farmland 90.24 Acres Construction DisturbanceSOILS 1360 Prime Farmland 21.35 Acres Operation DisturbanceSOILS 1360 Shallow Bedrock 98.75 Acres Construction DisturbanceSOILS 1360 Shallow Bedrock 21.12 Acres Operation DisturbanceSOILS 1360 Shallow Excavations 204.15 Acres Construction DisturbanceSOILS 1360 Shallow Excavations 46.68 Acres Operation DisturbanceSOILS 1360 Small Commercial Buildings 218.97 Acres Construction DisturbanceSOILS 1360 Small Commercial Buildings 50.44 Acres Operation DisturbanceSOILS 1360 Wind Erosion - Severe 54.00 Acres Construction DisturbanceSOILS 1360 Wind Erosion - Severe 14.26 Acres Operation DisturbanceSOILS 1370 Compaction Prone 7.69 Acres Construction DisturbanceSOILS 1370 Compaction Prone 1.42 Acres Operation DisturbanceSOILS 1370 Corrosion Steel 149.24 Acres Construction DisturbanceSOILS 1370 Corrosion Steel 34.78 Acres Operation DisturbanceSOILS 1370 Hydric 0.51 Acres Construction DisturbanceSOILS 1370 Hydric 0.12 Acres Operation DisturbanceSOILS 1370 LRP 26.59 Acres Construction DisturbanceSOILS 1370 LRP 5.86 Acres Operation DisturbanceSOILS 1370 Prime Farmland 42.08 Acres Construction DisturbanceSOILS 1370 Prime Farmland 8.95 Acres Operation DisturbanceSOILS 1370 Shallow Bedrock 90.18 Acres Construction DisturbanceSOILS 1370 Shallow Bedrock 22.24 Acres Operation DisturbanceSOILS 1370 Shallow Excavations 114.08 Acres Construction DisturbanceSOILS 1370 Shallow Excavations 27.22 Acres Operation DisturbanceSOILS 1370 Small Commercial Buildings 119.63 Acres Construction DisturbanceSOILS 1370 Small Commercial Buildings 28.30 Acres Operation DisturbanceSOILS 1380 Compaction Prone 48.95 Acres Construction DisturbanceSOILS 1380 Compaction Prone 7.41 Acres Operation DisturbanceSOILS 1380 Corrosion Concrete 45.67 Acres Construction DisturbanceSOILS 1380 Corrosion Concrete 5.93 Acres Operation DisturbanceSOILS 1380 Corrosion Steel 127.70 Acres Construction DisturbanceSOILS 1380 Corrosion Steel 20.77 Acres Operation DisturbanceSOILS 1380 Hydric 0.92 Acres Construction Disturbance

Page 247: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

SOILS 1380 Hydric 0.12 Acres Operation DisturbanceSOILS 1380 LRP 64.28 Acres Construction DisturbanceSOILS 1380 LRP 9.77 Acres Operation DisturbanceSOILS 1380 Prime Farmland 15.18 Acres Construction DisturbanceSOILS 1380 Prime Farmland 2.55 Acres Operation DisturbanceSOILS 1380 Shallow Bedrock 12.48 Acres Construction DisturbanceSOILS 1380 Shallow Bedrock 3.39 Acres Operation DisturbanceSOILS 1380 Shallow Excavations 48.16 Acres Construction DisturbanceSOILS 1380 Shallow Excavations 8.13 Acres Operation DisturbanceSOILS 1380 Shrink Swell 21.74 Acres Construction DisturbanceSOILS 1380 Shrink Swell 3.05 Acres Operation DisturbanceSOILS 1380 Small Commercial Buildings 67.05 Acres Construction DisturbanceSOILS 1380 Small Commercial Buildings 11.33 Acres Operation DisturbanceSOILS 1380 Water Erosion - Severe 10.78 Acres Construction DisturbanceSOILS 1380 Water Erosion - Severe 1.45 Acres Operation DisturbanceSOILS 1380 Wind Erosion - Severe 31.95 Acres Construction DisturbanceSOILS 1380 Wind Erosion - Severe 5.62 Acres Operation DisturbanceSOILS 1390 Compaction Prone 19.67 Acres Construction DisturbanceSOILS 1390 Compaction Prone 3.17 Acres Operation DisturbanceSOILS 1390 Corrosion Concrete 45.23 Acres Construction DisturbanceSOILS 1390 Corrosion Concrete 7.43 Acres Operation DisturbanceSOILS 1390 Corrosion Steel 46.48 Acres Construction DisturbanceSOILS 1390 Corrosion Steel 7.68 Acres Operation DisturbanceSOILS 1390 LRP 46.01 Acres Construction DisturbanceSOILS 1390 LRP 7.58 Acres Operation DisturbanceSOILS 1390 Shallow Excavations 26.81 Acres Construction DisturbanceSOILS 1390 Shallow Excavations 4.50 Acres Operation DisturbanceSOILS 1390 Shrink Swell 18.89 Acres Construction DisturbanceSOILS 1390 Shrink Swell 3.02 Acres Operation DisturbanceSOILS 1390 Small Commercial Buildings 19.89 Acres Construction DisturbanceSOILS 1390 Small Commercial Buildings 3.31 Acres Operation DisturbanceSOILS 1390 Wind Erosion - Severe 26.81 Acres Construction DisturbanceSOILS 1390 Wind Erosion - Severe 4.50 Acres Operation DisturbanceSOILS 1400 Compaction Prone 45.36 Acres Construction DisturbanceSOILS 1400 Compaction Prone 10.16 Acres Operation DisturbanceSOILS 1400 Corrosion Concrete 1.88 Acres Construction DisturbanceSOILS 1400 Corrosion Concrete 0.54 Acres Operation DisturbanceSOILS 1400 Corrosion Steel 222.23 Acres Construction DisturbanceSOILS 1400 Corrosion Steel 49.18 Acres Operation DisturbanceSOILS 1400 LRP 32.69 Acres Construction DisturbanceSOILS 1400 LRP 7.60 Acres Operation DisturbanceSOILS 1400 Prime Farmland 54.11 Acres Construction DisturbanceSOILS 1400 Prime Farmland 11.90 Acres Operation DisturbanceSOILS 1400 Shallow Bedrock 128.50 Acres Construction DisturbanceSOILS 1400 Shallow Bedrock 28.43 Acres Operation Disturbance

Page 248: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

SOILS 1400 Shallow Excavations 181.52 Acres Construction DisturbanceSOILS 1400 Shallow Excavations 40.18 Acres Operation DisturbanceSOILS 1400 Shrink Swell 0.02 Acres Construction DisturbanceSOILS 1400 Shrink Swell 0.01 Acres Operation DisturbanceSOILS 1400 Small Commercial Buildings 199.11 Acres Construction DisturbanceSOILS 1400 Small Commercial Buildings 43.72 Acres Operation DisturbanceSOILS 1400 Water Erosion - Severe 0.73 Acres Construction DisturbanceSOILS 1400 Water Erosion - Severe 0.21 Acres Operation DisturbanceSOILS 1410 Compaction Prone 76.45 Acres Construction DisturbanceSOILS 1410 Compaction Prone 16.23 Acres Operation DisturbanceSOILS 1410 Corrosion Concrete 134.46 Acres Construction DisturbanceSOILS 1410 Corrosion Concrete 33.64 Acres Operation DisturbanceSOILS 1410 Corrosion Steel 353.72 Acres Construction DisturbanceSOILS 1410 Corrosion Steel 73.97 Acres Operation DisturbanceSOILS 1410 Hydric 5.13 Acres Construction DisturbanceSOILS 1410 Hydric 1.07 Acres Operation DisturbanceSOILS 1410 LRP 233.39 Acres Construction DisturbanceSOILS 1410 LRP 53.16 Acres Operation DisturbanceSOILS 1410 Prime Farmland 74.45 Acres Construction DisturbanceSOILS 1410 Prime Farmland 13.58 Acres Operation DisturbanceSOILS 1410 Shallow Bedrock 112.30 Acres Construction DisturbanceSOILS 1410 Shallow Bedrock 19.83 Acres Operation DisturbanceSOILS 1410 Shallow Excavations 210.30 Acres Construction DisturbanceSOILS 1410 Shallow Excavations 44.22 Acres Operation DisturbanceSOILS 1410 Shrink Swell 43.65 Acres Construction DisturbanceSOILS 1410 Shrink Swell 9.84 Acres Operation DisturbanceSOILS 1410 Small Commercial Buildings 175.68 Acres Construction DisturbanceSOILS 1410 Small Commercial Buildings 36.49 Acres Operation DisturbanceSOILS 1410 Water Erosion - Severe 5.95 Acres Construction DisturbanceSOILS 1410 Water Erosion - Severe 0.96 Acres Operation DisturbanceSOILS 1410 Wind Erosion - Severe 91.90 Acres Construction DisturbanceSOILS 1410 Wind Erosion - Severe 22.53 Acres Operation DisturbanceSOILS 1420 Compaction Prone 9.05 Acres Construction DisturbanceSOILS 1420 Compaction Prone 1.02 Acres Operation DisturbanceSOILS 1420 Corrosion Concrete 80.08 Acres Construction DisturbanceSOILS 1420 Corrosion Concrete 11.55 Acres Operation DisturbanceSOILS 1420 Corrosion Steel 80.08 Acres Construction DisturbanceSOILS 1420 Corrosion Steel 11.55 Acres Operation DisturbanceSOILS 1420 LRP 80.08 Acres Construction DisturbanceSOILS 1420 LRP 11.55 Acres Operation DisturbanceSOILS 1420 Shallow Excavations 71.03 Acres Construction DisturbanceSOILS 1420 Shallow Excavations 10.53 Acres Operation DisturbanceSOILS 1420 Shrink Swell 9.05 Acres Construction DisturbanceSOILS 1420 Shrink Swell 1.02 Acres Operation DisturbanceSOILS 1420 Small Commercial Buildings 68.30 Acres Construction Disturbance

Page 249: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

SOILS 1420 Small Commercial Buildings 10.05 Acres Operation DisturbanceSOILS 1420 Wind Erosion - Severe 68.31 Acres Construction DisturbanceSOILS 1420 Wind Erosion - Severe 10.06 Acres Operation DisturbanceSOILS 1430 Compaction Prone 87.44 Acres Construction DisturbanceSOILS 1430 Compaction Prone 17.55 Acres Operation DisturbanceSOILS 1430 Corrosion Concrete 185.63 Acres Construction DisturbanceSOILS 1430 Corrosion Concrete 37.24 Acres Operation DisturbanceSOILS 1430 Corrosion Steel 186.63 Acres Construction DisturbanceSOILS 1430 Corrosion Steel 37.45 Acres Operation DisturbanceSOILS 1430 Hydric 15.93 Acres Construction DisturbanceSOILS 1430 Hydric 3.23 Acres Operation DisturbanceSOILS 1430 LRP 185.63 Acres Construction DisturbanceSOILS 1430 LRP 37.24 Acres Operation DisturbanceSOILS 1430 Shallow Excavations 109.87 Acres Construction DisturbanceSOILS 1430 Shallow Excavations 22.03 Acres Operation DisturbanceSOILS 1430 Shrink Swell 59.07 Acres Construction DisturbanceSOILS 1430 Shrink Swell 11.83 Acres Operation DisturbanceSOILS 1430 Small Commercial Buildings 96.19 Acres Construction DisturbanceSOILS 1430 Small Commercial Buildings 19.29 Acres Operation DisturbanceSOILS 1430 Wind Erosion - Severe 86.69 Acres Construction DisturbanceSOILS 1430 Wind Erosion - Severe 17.39 Acres Operation DisturbanceSOILS 1440 Compaction Prone 64.85 Acres Construction DisturbanceSOILS 1440 Compaction Prone 7.84 Acres Operation DisturbanceSOILS 1440 Corrosion Concrete 89.69 Acres Construction DisturbanceSOILS 1440 Corrosion Concrete 11.83 Acres Operation DisturbanceSOILS 1440 Corrosion Steel 89.73 Acres Construction DisturbanceSOILS 1440 Corrosion Steel 11.84 Acres Operation DisturbanceSOILS 1440 Hydric 47.46 Acres Construction DisturbanceSOILS 1440 Hydric 5.67 Acres Operation DisturbanceSOILS 1440 LRP 89.73 Acres Construction DisturbanceSOILS 1440 LRP 11.84 Acres Operation DisturbanceSOILS 1440 Prime Farmland 1.24 Acres Construction DisturbanceSOILS 1440 Prime Farmland 0.46 Acres Operation DisturbanceSOILS 1440 Shallow Excavations 45.10 Acres Construction DisturbanceSOILS 1440 Shallow Excavations 7.00 Acres Operation DisturbanceSOILS 1440 Shrink Swell 56.17 Acres Construction DisturbanceSOILS 1440 Shrink Swell 6.62 Acres Operation DisturbanceSOILS 1440 Small Commercial Buildings 61.46 Acres Construction DisturbanceSOILS 1440 Small Commercial Buildings 7.44 Acres Operation DisturbanceSOILS 1440 Wind Erosion - Severe 0.19 Acres Construction DisturbanceSOILS 1440 Wind Erosion - Severe 0.07 Acres Operation DisturbanceSOILS 1450 Compaction Prone 61.93 Acres Construction DisturbanceSOILS 1450 Compaction Prone 7.62 Acres Operation DisturbanceSOILS 1450 Corrosion Concrete 67.52 Acres Construction DisturbanceSOILS 1450 Corrosion Concrete 8.33 Acres Operation Disturbance

Page 250: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

SOILS 1450 Corrosion Steel 67.81 Acres Construction DisturbanceSOILS 1450 Corrosion Steel 8.44 Acres Operation DisturbanceSOILS 1450 Hydric 6.76 Acres Construction DisturbanceSOILS 1450 Hydric 1.22 Acres Operation DisturbanceSOILS 1450 LRP 67.81 Acres Construction DisturbanceSOILS 1450 LRP 8.44 Acres Operation DisturbanceSOILS 1450 Shallow Excavations 6.74 Acres Construction DisturbanceSOILS 1450 Shallow Excavations 0.67 Acres Operation DisturbanceSOILS 1450 Shrink Swell 32.80 Acres Construction DisturbanceSOILS 1450 Shrink Swell 3.66 Acres Operation DisturbanceSOILS 1450 Small Commercial Buildings 4.40 Acres Construction DisturbanceSOILS 1450 Small Commercial Buildings 0.52 Acres Operation DisturbanceSOILS 1450 Wind Erosion - Severe 1.16 Acres Construction DisturbanceSOILS 1450 Wind Erosion - Severe 0.18 Acres Operation DisturbanceSOILS 1460 Compaction Prone 203.12 Acres Construction DisturbanceSOILS 1460 Compaction Prone 31.80 Acres Operation DisturbanceSOILS 1460 Corrosion Concrete 220.21 Acres Construction DisturbanceSOILS 1460 Corrosion Concrete 34.47 Acres Operation DisturbanceSOILS 1460 Corrosion Steel 350.20 Acres Construction DisturbanceSOILS 1460 Corrosion Steel 54.85 Acres Operation DisturbanceSOILS 1460 Hydric 20.19 Acres Construction DisturbanceSOILS 1460 Hydric 4.85 Acres Operation DisturbanceSOILS 1460 LRP 346.76 Acres Construction DisturbanceSOILS 1460 LRP 54.32 Acres Operation DisturbanceSOILS 1460 Shallow Bedrock 16.17 Acres Construction DisturbanceSOILS 1460 Shallow Bedrock 3.26 Acres Operation DisturbanceSOILS 1460 Shallow Excavations 105.12 Acres Construction DisturbanceSOILS 1460 Shallow Excavations 16.78 Acres Operation DisturbanceSOILS 1460 Shrink Swell 115.21 Acres Construction DisturbanceSOILS 1460 Shrink Swell 16.69 Acres Operation DisturbanceSOILS 1460 Small Commercial Buildings 84.14 Acres Construction DisturbanceSOILS 1460 Small Commercial Buildings 14.11 Acres Operation DisturbanceSOILS 1460 Wind Erosion - Severe 1.91 Acres Construction DisturbanceSOILS 1460 Wind Erosion - Severe 0.39 Acres Operation DisturbanceSOILS 1470 Compaction Prone 166.80 Acres Construction DisturbanceSOILS 1470 Compaction Prone 35.23 Acres Operation DisturbanceSOILS 1470 Corrosion Concrete 204.87 Acres Construction DisturbanceSOILS 1470 Corrosion Concrete 43.11 Acres Operation DisturbanceSOILS 1470 Corrosion Steel 397.91 Acres Construction DisturbanceSOILS 1470 Corrosion Steel 83.78 Acres Operation DisturbanceSOILS 1470 Hydric 28.81 Acres Construction DisturbanceSOILS 1470 Hydric 5.95 Acres Operation DisturbanceSOILS 1470 LRP 391.24 Acres Construction DisturbanceSOILS 1470 LRP 82.39 Acres Operation DisturbanceSOILS 1470 Shallow Bedrock 35.46 Acres Construction Disturbance

Page 251: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

SOILS 1470 Shallow Bedrock 7.38 Acres Operation DisturbanceSOILS 1470 Shallow Excavations 105.05 Acres Construction DisturbanceSOILS 1470 Shallow Excavations 21.72 Acres Operation DisturbanceSOILS 1470 Shrink Swell 33.54 Acres Construction DisturbanceSOILS 1470 Shrink Swell 6.96 Acres Operation DisturbanceSOILS 1470 Small Commercial Buildings 93.99 Acres Construction DisturbanceSOILS 1470 Small Commercial Buildings 19.45 Acres Operation DisturbanceSOILS 1470 Wind Erosion - Severe 2.98 Acres Construction DisturbanceSOILS 1470 Wind Erosion - Severe 0.62 Acres Operation DisturbanceSOILS 1480 Compaction Prone 133.82 Acres Construction DisturbanceSOILS 1480 Compaction Prone 21.26 Acres Operation DisturbanceSOILS 1480 Corrosion Concrete 60.63 Acres Construction DisturbanceSOILS 1480 Corrosion Concrete 8.29 Acres Operation DisturbanceSOILS 1480 Corrosion Steel 621.32 Acres Construction DisturbanceSOILS 1480 Corrosion Steel 104.51 Acres Operation DisturbanceSOILS 1480 Hydric 8.41 Acres Construction DisturbanceSOILS 1480 Hydric 1.02 Acres Operation DisturbanceSOILS 1480 LRP 478.49 Acres Construction DisturbanceSOILS 1480 LRP 79.03 Acres Operation DisturbanceSOILS 1480 Shallow Bedrock 54.04 Acres Construction DisturbanceSOILS 1480 Shallow Bedrock 9.97 Acres Operation DisturbanceSOILS 1480 Shallow Excavations 234.42 Acres Construction DisturbanceSOILS 1480 Shallow Excavations 40.37 Acres Operation DisturbanceSOILS 1480 Shrink Swell 22.83 Acres Construction DisturbanceSOILS 1480 Shrink Swell 2.76 Acres Operation DisturbanceSOILS 1480 Small Commercial Buildings 243.85 Acres Construction DisturbanceSOILS 1480 Small Commercial Buildings 39.52 Acres Operation DisturbanceSOILS 1480 Wind Erosion - Severe 25.57 Acres Construction DisturbanceSOILS 1480 Wind Erosion - Severe 4.22 Acres Operation DisturbanceSOILS 1490 Compaction Prone 73.73 Acres Construction DisturbanceSOILS 1490 Compaction Prone 15.10 Acres Operation DisturbanceSOILS 1490 Corrosion Concrete 98.45 Acres Construction DisturbanceSOILS 1490 Corrosion Concrete 20.16 Acres Operation DisturbanceSOILS 1490 Corrosion Steel 109.03 Acres Construction DisturbanceSOILS 1490 Corrosion Steel 22.33 Acres Operation DisturbanceSOILS 1490 Hydric 0.01 Acres Construction DisturbanceSOILS 1490 Hydric 0.00 Acres Operation DisturbanceSOILS 1490 LRP 108.56 Acres Construction DisturbanceSOILS 1490 LRP 22.23 Acres Operation DisturbanceSOILS 1490 Shallow Bedrock 0.02 Acres Construction DisturbanceSOILS 1490 Shallow Bedrock 0.00 Acres Operation DisturbanceSOILS 1490 Shallow Excavations 76.32 Acres Construction DisturbanceSOILS 1490 Shallow Excavations 15.63 Acres Operation DisturbanceSOILS 1490 Shrink Swell 34.31 Acres Construction DisturbanceSOILS 1490 Shrink Swell 7.02 Acres Operation Disturbance

Page 252: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

SOILS 1490 Small Commercial Buildings 66.71 Acres Construction DisturbanceSOILS 1490 Small Commercial Buildings 13.66 Acres Operation DisturbanceSOILS 1490 Wind Erosion - Severe 32.38 Acres Construction DisturbanceSOILS 1490 Wind Erosion - Severe 6.63 Acres Operation DisturbanceSOILS 1490.05 Compaction Prone 220.37 Acres Construction DisturbanceSOILS 1490.05 Compaction Prone 42.72 Acres Operation DisturbanceSOILS 1490.05 Corrosion Concrete 150.53 Acres Construction DisturbanceSOILS 1490.05 Corrosion Concrete 29.21 Acres Operation DisturbanceSOILS 1490.05 Corrosion Steel 412.73 Acres Construction DisturbanceSOILS 1490.05 Corrosion Steel 80.06 Acres Operation DisturbanceSOILS 1490.05 Hydric 0.68 Acres Construction DisturbanceSOILS 1490.05 Hydric 0.13 Acres Operation DisturbanceSOILS 1490.05 LRP 205.05 Acres Construction DisturbanceSOILS 1490.05 LRP 39.80 Acres Operation DisturbanceSOILS 1490.05 Prime Farmland 63.89 Acres Construction DisturbanceSOILS 1490.05 Prime Farmland 12.43 Acres Operation DisturbanceSOILS 1490.05 Shallow Bedrock 43.65 Acres Construction DisturbanceSOILS 1490.05 Shallow Bedrock 8.46 Acres Operation DisturbanceSOILS 1490.05 Shallow Excavations 193.00 Acres Construction DisturbanceSOILS 1490.05 Shallow Excavations 37.42 Acres Operation DisturbanceSOILS 1490.05 Shrink Swell 20.54 Acres Construction DisturbanceSOILS 1490.05 Shrink Swell 3.97 Acres Operation DisturbanceSOILS 1490.05 Small Commercial Buildings 162.62 Acres Construction DisturbanceSOILS 1490.05 Small Commercial Buildings 31.50 Acres Operation DisturbanceSOILS 1490.05 Wind Erosion - Severe 18.63 Acres Construction DisturbanceSOILS 1490.05 Wind Erosion - Severe 3.61 Acres Operation DisturbanceSOILS 1495 Compaction Prone 57.35 Acres Construction DisturbanceSOILS 1495 Compaction Prone 10.79 Acres Operation DisturbanceSOILS 1495 Corrosion Concrete 79.21 Acres Construction DisturbanceSOILS 1495 Corrosion Concrete 14.84 Acres Operation DisturbanceSOILS 1495 Corrosion Steel 79.21 Acres Construction DisturbanceSOILS 1495 Corrosion Steel 14.84 Acres Operation DisturbanceSOILS 1495 Hydric 0.00 Acres Construction DisturbanceSOILS 1495 Hydric 0.00 Acres Operation DisturbanceSOILS 1495 LRP 78.84 Acres Construction DisturbanceSOILS 1495 LRP 14.76 Acres Operation DisturbanceSOILS 1495 Shallow Excavations 13.63 Acres Construction DisturbanceSOILS 1495 Shallow Excavations 2.59 Acres Operation DisturbanceSOILS 1495 Shrink Swell 51.03 Acres Construction DisturbanceSOILS 1495 Shrink Swell 9.57 Acres Operation DisturbanceSOILS 1495 Small Commercial Buildings 56.14 Acres Construction DisturbanceSOILS 1495 Small Commercial Buildings 10.53 Acres Operation DisturbanceSOILS 1495 Wind Erosion - Severe 5.11 Acres Construction DisturbanceSOILS 1495 Wind Erosion - Severe 0.96 Acres Operation DisturbanceSOILS 1500 Compaction Prone 80.47 Acres Construction Disturbance

Page 253: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

SOILS 1500 Compaction Prone 9.58 Acres Operation DisturbanceSOILS 1500 Corrosion Concrete 148.83 Acres Construction DisturbanceSOILS 1500 Corrosion Concrete 18.84 Acres Operation DisturbanceSOILS 1500 Corrosion Steel 183.65 Acres Construction DisturbanceSOILS 1500 Corrosion Steel 26.10 Acres Operation DisturbanceSOILS 1500 Hydric 0.57 Acres Construction DisturbanceSOILS 1500 Hydric 0.09 Acres Operation DisturbanceSOILS 1500 LRP 174.83 Acres Construction DisturbanceSOILS 1500 LRP 25.05 Acres Operation DisturbanceSOILS 1500 Prime Farmland 23.31 Acres Construction DisturbanceSOILS 1500 Prime Farmland 4.35 Acres Operation DisturbanceSOILS 1500 Shallow Bedrock 1.51 Acres Construction DisturbanceSOILS 1500 Shallow Bedrock 0.35 Acres Operation DisturbanceSOILS 1500 Shallow Excavations 73.02 Acres Construction DisturbanceSOILS 1500 Shallow Excavations 13.97 Acres Operation DisturbanceSOILS 1500 Shrink Swell 34.83 Acres Construction DisturbanceSOILS 1500 Shrink Swell 2.52 Acres Operation DisturbanceSOILS 1500 Small Commercial Buildings 42.92 Acres Construction DisturbanceSOILS 1500 Small Commercial Buildings 4.31 Acres Operation DisturbanceSOILS 1500 Wind Erosion - Severe 4.66 Acres Construction DisturbanceSOILS 1500 Wind Erosion - Severe 0.74 Acres Operation DisturbanceSOILS 1500.02 Compaction Prone 87.98 Acres Construction DisturbanceSOILS 1500.02 Compaction Prone 15.07 Acres Operation DisturbanceSOILS 1500.02 Corrosion Concrete 60.37 Acres Construction DisturbanceSOILS 1500.02 Corrosion Concrete 10.11 Acres Operation DisturbanceSOILS 1500.02 Corrosion Steel 181.66 Acres Construction DisturbanceSOILS 1500.02 Corrosion Steel 25.91 Acres Operation DisturbanceSOILS 1500.02 Hydric 0.21 Acres Construction DisturbanceSOILS 1500.02 Hydric 0.03 Acres Operation DisturbanceSOILS 1500.02 LRP 88.05 Acres Construction DisturbanceSOILS 1500.02 LRP 13.02 Acres Operation DisturbanceSOILS 1500.02 Prime Farmland 64.50 Acres Construction DisturbanceSOILS 1500.02 Prime Farmland 8.11 Acres Operation DisturbanceSOILS 1500.02 Shallow Bedrock 9.92 Acres Construction DisturbanceSOILS 1500.02 Shallow Bedrock 2.57 Acres Operation DisturbanceSOILS 1500.02 Shallow Excavations 75.45 Acres Construction DisturbanceSOILS 1500.02 Shallow Excavations 11.91 Acres Operation DisturbanceSOILS 1500.02 Shrink Swell 26.04 Acres Construction DisturbanceSOILS 1500.02 Shrink Swell 4.34 Acres Operation DisturbanceSOILS 1500.02 Small Commercial Buildings 102.46 Acres Construction DisturbanceSOILS 1500.02 Small Commercial Buildings 14.35 Acres Operation DisturbanceSOILS 1500.02 Wind Erosion - Severe 0.25 Acres Construction DisturbanceSOILS 1500.02 Wind Erosion - Severe 0.09 Acres Operation DisturbanceSOILS 1500.05 Compaction Prone 68.53 Acres Construction DisturbanceSOILS 1500.05 Compaction Prone 18.81 Acres Operation Disturbance

Page 254: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

SOILS 1500.05 Corrosion Concrete 1.09 Acres Construction DisturbanceSOILS 1500.05 Corrosion Concrete 0.21 Acres Operation DisturbanceSOILS 1500.05 Corrosion Steel 113.10 Acres Construction DisturbanceSOILS 1500.05 Corrosion Steel 30.29 Acres Operation DisturbanceSOILS 1500.05 Hydric 0.38 Acres Construction DisturbanceSOILS 1500.05 Hydric 0.14 Acres Operation DisturbanceSOILS 1500.05 LRP 19.53 Acres Construction DisturbanceSOILS 1500.05 LRP 4.14 Acres Operation DisturbanceSOILS 1500.05 Prime Farmland 33.92 Acres Construction DisturbanceSOILS 1500.05 Prime Farmland 9.59 Acres Operation DisturbanceSOILS 1500.05 Shallow Bedrock 38.17 Acres Construction DisturbanceSOILS 1500.05 Shallow Bedrock 11.15 Acres Operation DisturbanceSOILS 1500.05 Shallow Excavations 78.44 Acres Construction DisturbanceSOILS 1500.05 Shallow Excavations 20.82 Acres Operation DisturbanceSOILS 1500.05 Small Commercial Buildings 77.60 Acres Construction DisturbanceSOILS 1500.05 Small Commercial Buildings 20.57 Acres Operation DisturbanceSOILS 1501.1 Compaction Prone 118.29 Acres Construction DisturbanceSOILS 1501.1 Compaction Prone 33.80 Acres Operation DisturbanceSOILS 1501.1 Corrosion Concrete 4.20 Acres Construction DisturbanceSOILS 1501.1 Corrosion Concrete 0.98 Acres Operation DisturbanceSOILS 1501.1 Corrosion Steel 73.44 Acres Construction DisturbanceSOILS 1501.1 Corrosion Steel 18.88 Acres Operation DisturbanceSOILS 1501.1 Hydric 0.01 Acres Construction DisturbanceSOILS 1501.1 Hydric 0.00 Acres Operation DisturbanceSOILS 1501.1 LRP 54.97 Acres Construction DisturbanceSOILS 1501.1 LRP 13.18 Acres Operation DisturbanceSOILS 1501.1 Prime Farmland 2.93 Acres Construction DisturbanceSOILS 1501.1 Prime Farmland 0.86 Acres Operation DisturbanceSOILS 1501.1 Shallow Bedrock 119.96 Acres Construction DisturbanceSOILS 1501.1 Shallow Bedrock 34.12 Acres Operation DisturbanceSOILS 1501.1 Shallow Excavations 6.58 Acres Construction DisturbanceSOILS 1501.1 Shallow Excavations 1.62 Acres Operation DisturbanceSOILS 1501.1 Shrink Swell 0.44 Acres Construction DisturbanceSOILS 1501.1 Shrink Swell 0.08 Acres Operation DisturbanceSOILS 1501.1 Small Commercial Buildings 3.63 Acres Construction DisturbanceSOILS 1501.1 Small Commercial Buildings 0.75 Acres Operation DisturbanceSOILS 1501.1 Wind Erosion - Severe 0.00 Acres Construction DisturbanceSOILS 1501.1 Wind Erosion - Severe 0.00 Acres Operation DisturbanceSOILS 1501.15 Compaction Prone 12.69 Acres Construction DisturbanceSOILS 1501.15 Compaction Prone 2.66 Acres Operation DisturbanceSOILS 1501.15 Corrosion Concrete 0.11 Acres Construction DisturbanceSOILS 1501.15 Corrosion Concrete 0.02 Acres Operation DisturbanceSOILS 1501.15 Corrosion Steel 17.46 Acres Construction DisturbanceSOILS 1501.15 Corrosion Steel 3.68 Acres Operation DisturbanceSOILS 1501.15 LRP 17.01 Acres Construction Disturbance

Page 255: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

SOILS 1501.15 LRP 3.55 Acres Operation DisturbanceSOILS 1501.15 Prime Farmland 0.11 Acres Construction DisturbanceSOILS 1501.15 Prime Farmland 0.07 Acres Operation DisturbanceSOILS 1501.15 Shallow Bedrock 17.01 Acres Construction DisturbanceSOILS 1501.15 Shallow Bedrock 3.55 Acres Operation DisturbanceSOILS 1501.15 Shallow Excavations 0.35 Acres Construction DisturbanceSOILS 1501.15 Shallow Excavations 0.11 Acres Operation DisturbanceSOILS 1501.15 Small Commercial Buildings 0.35 Acres Construction DisturbanceSOILS 1501.15 Small Commercial Buildings 0.11 Acres Operation DisturbanceSOILS 1502.5 Compaction Prone 106.72 Acres Construction DisturbanceSOILS 1502.5 Compaction Prone 22.69 Acres Operation DisturbanceSOILS 1502.5 Corrosion Concrete 22.96 Acres Construction DisturbanceSOILS 1502.5 Corrosion Concrete 5.85 Acres Operation DisturbanceSOILS 1502.5 Corrosion Steel 406.92 Acres Construction DisturbanceSOILS 1502.5 Corrosion Steel 110.49 Acres Operation DisturbanceSOILS 1502.5 Hydric 13.49 Acres Construction DisturbanceSOILS 1502.5 Hydric 3.36 Acres Operation DisturbanceSOILS 1502.5 LRP 72.06 Acres Construction DisturbanceSOILS 1502.5 LRP 13.43 Acres Operation DisturbanceSOILS 1502.5 Prime Farmland 0.13 Acres Construction DisturbanceSOILS 1502.5 Prime Farmland 0.08 Acres Operation DisturbanceSOILS 1502.5 Shallow Bedrock 351.78 Acres Construction DisturbanceSOILS 1502.5 Shallow Bedrock 92.92 Acres Operation DisturbanceSOILS 1502.5 Shallow Excavations 361.70 Acres Construction DisturbanceSOILS 1502.5 Shallow Excavations 105.33 Acres Operation DisturbanceSOILS 1502.5 Shrink Swell 17.37 Acres Construction DisturbanceSOILS 1502.5 Shrink Swell 4.81 Acres Operation DisturbanceSOILS 1502.5 Small Commercial Buildings 332.14 Acres Construction DisturbanceSOILS 1502.5 Small Commercial Buildings 95.08 Acres Operation DisturbanceSOILS 1502.5 Water Erosion - Severe 8.17 Acres Construction DisturbanceSOILS 1502.5 Water Erosion - Severe 1.78 Acres Operation DisturbanceSOILS 1502.5 Wind Erosion - Severe 7.08 Acres Construction DisturbanceSOILS 1502.5 Wind Erosion - Severe 2.54 Acres Operation DisturbanceSOILS 1503 Compaction Prone 50.84 Acres Construction DisturbanceSOILS 1503 Compaction Prone 14.33 Acres Operation DisturbanceSOILS 1503 Corrosion Concrete 0.50 Acres Construction DisturbanceSOILS 1503 Corrosion Concrete 0.15 Acres Operation DisturbanceSOILS 1503 Corrosion Steel 15.09 Acres Construction DisturbanceSOILS 1503 Corrosion Steel 4.29 Acres Operation DisturbanceSOILS 1503 LRP 4.68 Acres Construction DisturbanceSOILS 1503 LRP 1.40 Acres Operation DisturbanceSOILS 1503 Shallow Bedrock 47.20 Acres Construction DisturbanceSOILS 1503 Shallow Bedrock 13.24 Acres Operation DisturbanceSOILS 1503.5 Compaction Prone 5.03 Acres Construction DisturbanceSOILS 1503.5 Compaction Prone 0.70 Acres Operation Disturbance

Page 256: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

SOILS 1503.5 Corrosion Concrete 0.68 Acres Construction DisturbanceSOILS 1503.5 Corrosion Concrete 0.10 Acres Operation DisturbanceSOILS 1503.5 Corrosion Steel 6.31 Acres Construction DisturbanceSOILS 1503.5 Corrosion Steel 0.88 Acres Operation DisturbanceSOILS 1503.5 LRP 6.29 Acres Construction DisturbanceSOILS 1503.5 LRP 0.87 Acres Operation DisturbanceSOILS 1503.5 Shallow Bedrock 0.10 Acres Construction DisturbanceSOILS 1503.5 Shallow Bedrock 0.01 Acres Operation DisturbanceSOILS 1504 Compaction Prone 46.98 Acres Construction DisturbanceSOILS 1504 Compaction Prone 14.89 Acres Operation DisturbanceSOILS 1504 Corrosion Concrete 1.36 Acres Construction DisturbanceSOILS 1504 Corrosion Concrete 0.44 Acres Operation DisturbanceSOILS 1504 Corrosion Steel 22.10 Acres Construction DisturbanceSOILS 1504 Corrosion Steel 7.10 Acres Operation DisturbanceSOILS 1504 LRP 12.53 Acres Construction DisturbanceSOILS 1504 LRP 4.06 Acres Operation DisturbanceSOILS 1504 Shallow Bedrock 36.41 Acres Construction DisturbanceSOILS 1504 Shallow Bedrock 11.48 Acres Operation DisturbanceSOILS 1504 Shallow Excavations 1.44 Acres Construction DisturbanceSOILS 1504 Shallow Excavations 0.44 Acres Operation DisturbanceSOILS 1504 Small Commercial Buildings 1.44 Acres Construction DisturbanceSOILS 1504 Small Commercial Buildings 0.44 Acres Operation DisturbanceSOILS 1505 Compaction Prone 111.31 Acres Construction DisturbanceSOILS 1505 Compaction Prone 43.13 Acres Operation DisturbanceSOILS 1505 Corrosion Steel 65.81 Acres Construction DisturbanceSOILS 1505 Corrosion Steel 25.70 Acres Operation DisturbanceSOILS 1505 LRP 45.86 Acres Construction DisturbanceSOILS 1505 LRP 16.99 Acres Operation DisturbanceSOILS 1505 Shallow Bedrock 114.36 Acres Construction DisturbanceSOILS 1505 Shallow Bedrock 44.45 Acres Operation DisturbanceSOILS 1506 Compaction Prone 219.04 Acres Construction DisturbanceSOILS 1506 Compaction Prone 54.39 Acres Operation DisturbanceSOILS 1506 Corrosion Concrete 12.02 Acres Construction DisturbanceSOILS 1506 Corrosion Concrete 2.88 Acres Operation DisturbanceSOILS 1506 Corrosion Steel 180.26 Acres Construction DisturbanceSOILS 1506 Corrosion Steel 45.34 Acres Operation DisturbanceSOILS 1506 Hydric 0.13 Acres Construction DisturbanceSOILS 1506 Hydric 0.05 Acres Operation DisturbanceSOILS 1506 LRP 91.62 Acres Construction DisturbanceSOILS 1506 LRP 21.31 Acres Operation DisturbanceSOILS 1506 Prime Farmland 4.72 Acres Construction DisturbanceSOILS 1506 Prime Farmland 1.37 Acres Operation DisturbanceSOILS 1506 Shallow Bedrock 203.43 Acres Construction DisturbanceSOILS 1506 Shallow Bedrock 48.89 Acres Operation DisturbanceSOILS 1506 Shallow Excavations 71.50 Acres Construction Disturbance

Page 257: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

SOILS 1506 Shallow Excavations 19.59 Acres Operation DisturbanceSOILS 1506 Shrink Swell 28.58 Acres Construction DisturbanceSOILS 1506 Shrink Swell 6.22 Acres Operation DisturbanceSOILS 1506 Small Commercial Buildings 69.09 Acres Construction DisturbanceSOILS 1506 Small Commercial Buildings 18.73 Acres Operation DisturbanceSOILS 1506 Wind Erosion - Severe 0.00 Acres Construction DisturbanceSOILS 1506 Wind Erosion - Severe 0.00 Acres Operation DisturbanceSOILS 1510 Compaction Prone 522.64 Acres Construction DisturbanceSOILS 1510 Compaction Prone 124.38 Acres Operation DisturbanceSOILS 1510 Corrosion Concrete 8.21 Acres Construction DisturbanceSOILS 1510 Corrosion Concrete 2.60 Acres Operation DisturbanceSOILS 1510 Corrosion Steel 458.52 Acres Construction DisturbanceSOILS 1510 Corrosion Steel 118.31 Acres Operation DisturbanceSOILS 1510 Hydric 0.21 Acres Construction DisturbanceSOILS 1510 Hydric 0.04 Acres Operation DisturbanceSOILS 1510 LRP 16.35 Acres Construction DisturbanceSOILS 1510 LRP 4.94 Acres Operation DisturbanceSOILS 1510 Prime Farmland 67.81 Acres Construction DisturbanceSOILS 1510 Prime Farmland 16.17 Acres Operation DisturbanceSOILS 1510 Shallow Bedrock 327.31 Acres Construction DisturbanceSOILS 1510 Shallow Bedrock 85.05 Acres Operation DisturbanceSOILS 1510 Shallow Excavations 638.74 Acres Construction DisturbanceSOILS 1510 Shallow Excavations 161.11 Acres Operation DisturbanceSOILS 1510 Shrink Swell 113.49 Acres Construction DisturbanceSOILS 1510 Shrink Swell 28.32 Acres Operation DisturbanceSOILS 1510 Small Commercial Buildings 631.42 Acres Construction DisturbanceSOILS 1510 Small Commercial Buildings 157.33 Acres Operation DisturbanceSOILS 1510 Wind Erosion - Severe 4.25 Acres Construction DisturbanceSOILS 1510 Wind Erosion - Severe 1.08 Acres Operation DisturbanceSOILS 1520 Compaction Prone 296.81 Acres Construction DisturbanceSOILS 1520 Compaction Prone 74.30 Acres Operation DisturbanceSOILS 1520 Corrosion Concrete 36.04 Acres Construction DisturbanceSOILS 1520 Corrosion Concrete 10.80 Acres Operation DisturbanceSOILS 1520 Corrosion Steel 1086.45 Acres Construction DisturbanceSOILS 1520 Corrosion Steel 241.97 Acres Operation DisturbanceSOILS 1520 Hydric 7.67 Acres Construction DisturbanceSOILS 1520 Hydric 2.34 Acres Operation DisturbanceSOILS 1520 LRP 282.46 Acres Construction DisturbanceSOILS 1520 LRP 64.08 Acres Operation DisturbanceSOILS 1520 Prime Farmland 129.04 Acres Construction DisturbanceSOILS 1520 Prime Farmland 37.83 Acres Operation DisturbanceSOILS 1520 Shallow Bedrock 621.09 Acres Construction DisturbanceSOILS 1520 Shallow Bedrock 129.05 Acres Operation DisturbanceSOILS 1520 Shallow Excavations 1124.39 Acres Construction DisturbanceSOILS 1520 Shallow Excavations 249.60 Acres Operation Disturbance

Page 258: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

SOILS 1520 Shrink Swell 26.04 Acres Construction DisturbanceSOILS 1520 Shrink Swell 7.71 Acres Operation DisturbanceSOILS 1520 Small Commercial Buildings 1150.29 Acres Construction DisturbanceSOILS 1520 Small Commercial Buildings 255.02 Acres Operation DisturbanceSOILS 1520 Water Erosion - Severe 45.24 Acres Construction DisturbanceSOILS 1520 Water Erosion - Severe 9.99 Acres Operation DisturbanceSOILS 1520 Wind Erosion - Severe 12.81 Acres Construction DisturbanceSOILS 1520 Wind Erosion - Severe 3.56 Acres Operation DisturbanceSOILS 1530 Compaction Prone 2.90 Acres Construction DisturbanceSOILS 1530 Compaction Prone 0.76 Acres Operation DisturbanceSOILS 1530 Corrosion Concrete 5.79 Acres Construction DisturbanceSOILS 1530 Corrosion Concrete 1.29 Acres Operation DisturbanceSOILS 1530 Corrosion Steel 65.14 Acres Construction DisturbanceSOILS 1530 Corrosion Steel 13.91 Acres Operation DisturbanceSOILS 1530 LRP 8.03 Acres Construction DisturbanceSOILS 1530 LRP 1.90 Acres Operation DisturbanceSOILS 1530 Shallow Bedrock 53.85 Acres Construction DisturbanceSOILS 1530 Shallow Bedrock 11.45 Acres Operation DisturbanceSOILS 1530 Shallow Excavations 63.42 Acres Construction DisturbanceSOILS 1530 Shallow Excavations 13.64 Acres Operation DisturbanceSOILS 1530 Shrink Swell 1.42 Acres Construction DisturbanceSOILS 1530 Shrink Swell 0.32 Acres Operation DisturbanceSOILS 1530 Small Commercial Buildings 38.45 Acres Construction DisturbanceSOILS 1530 Small Commercial Buildings 7.90 Acres Operation DisturbanceSOILS 1530 Water Erosion - Severe 4.95 Acres Construction DisturbanceSOILS 1530 Water Erosion - Severe 1.10 Acres Operation DisturbanceSOILS 1530 Wind Erosion - Severe 1.31 Acres Construction DisturbanceSOILS 1530 Wind Erosion - Severe 0.34 Acres Operation DisturbanceSOILS 1540.1 Compaction Prone 48.12 Acres Construction DisturbanceSOILS 1540.1 Compaction Prone 8.09 Acres Operation DisturbanceSOILS 1540.1 Corrosion Concrete 48.95 Acres Construction DisturbanceSOILS 1540.1 Corrosion Concrete 8.29 Acres Operation DisturbanceSOILS 1540.1 Corrosion Steel 189.29 Acres Construction DisturbanceSOILS 1540.1 Corrosion Steel 28.27 Acres Operation DisturbanceSOILS 1540.1 Hydric 0.87 Acres Construction DisturbanceSOILS 1540.1 Hydric 0.17 Acres Operation DisturbanceSOILS 1540.1 LRP 55.90 Acres Construction DisturbanceSOILS 1540.1 LRP 9.63 Acres Operation DisturbanceSOILS 1540.1 Shallow Bedrock 155.86 Acres Construction DisturbanceSOILS 1540.1 Shallow Bedrock 22.28 Acres Operation DisturbanceSOILS 1540.1 Shallow Excavations 181.03 Acres Construction DisturbanceSOILS 1540.1 Shallow Excavations 27.02 Acres Operation DisturbanceSOILS 1540.1 Shrink Swell 1.75 Acres Construction DisturbanceSOILS 1540.1 Shrink Swell 0.49 Acres Operation DisturbanceSOILS 1540.1 Small Commercial Buildings 186.78 Acres Construction Disturbance

Page 259: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

SOILS 1540.1 Small Commercial Buildings 28.02 Acres Operation DisturbanceSOILS 1540.1 Water Erosion - Severe 1.40 Acres Construction DisturbanceSOILS 1540.1 Water Erosion - Severe 0.32 Acres Operation DisturbanceSOILS 1540.1 Wind Erosion - Severe 27.74 Acres Construction DisturbanceSOILS 1540.1 Wind Erosion - Severe 4.60 Acres Operation DisturbanceSOILS 1540.2 Compaction Prone 4.99 Acres Construction DisturbanceSOILS 1540.2 Compaction Prone 0.76 Acres Operation DisturbanceSOILS 1540.2 Corrosion Concrete 5.20 Acres Construction DisturbanceSOILS 1540.2 Corrosion Concrete 0.84 Acres Operation DisturbanceSOILS 1540.2 Corrosion Steel 182.23 Acres Construction DisturbanceSOILS 1540.2 Corrosion Steel 23.62 Acres Operation DisturbanceSOILS 1540.2 Hydric 0.16 Acres Construction DisturbanceSOILS 1540.2 Hydric 0.04 Acres Operation DisturbanceSOILS 1540.2 LRP 6.79 Acres Construction DisturbanceSOILS 1540.2 LRP 1.12 Acres Operation DisturbanceSOILS 1540.2 Shallow Bedrock 134.76 Acres Construction DisturbanceSOILS 1540.2 Shallow Bedrock 16.85 Acres Operation DisturbanceSOILS 1540.2 Shallow Excavations 157.58 Acres Construction DisturbanceSOILS 1540.2 Shallow Excavations 20.52 Acres Operation DisturbanceSOILS 1540.2 Shrink Swell 4.97 Acres Construction DisturbanceSOILS 1540.2 Shrink Swell 0.76 Acres Operation DisturbanceSOILS 1540.2 Small Commercial Buildings 157.93 Acres Construction DisturbanceSOILS 1540.2 Small Commercial Buildings 20.64 Acres Operation DisturbanceSOILS 1540.2 Water Erosion - Severe 4.04 Acres Construction DisturbanceSOILS 1540.2 Water Erosion - Severe 0.50 Acres Operation DisturbanceSOILS 1540.2 Wind Erosion - Severe 3.46 Acres Construction DisturbanceSOILS 1540.2 Wind Erosion - Severe 0.71 Acres Operation DisturbanceSOILS 1545 Compaction Prone 0.92 Acres Construction DisturbanceSOILS 1545 Compaction Prone 0.21 Acres Operation DisturbanceSOILS 1545 Corrosion Concrete 0.92 Acres Construction DisturbanceSOILS 1545 Corrosion Concrete 0.21 Acres Operation DisturbanceSOILS 1545 Corrosion Steel 22.24 Acres Construction DisturbanceSOILS 1545 Corrosion Steel 3.80 Acres Operation DisturbanceSOILS 1545 Hydric 1.02 Acres Construction DisturbanceSOILS 1545 Hydric 0.18 Acres Operation DisturbanceSOILS 1545 LRP 1.89 Acres Construction DisturbanceSOILS 1545 LRP 0.40 Acres Operation DisturbanceSOILS 1545 Shallow Bedrock 8.00 Acres Construction DisturbanceSOILS 1545 Shallow Bedrock 1.57 Acres Operation DisturbanceSOILS 1545 Shallow Excavations 20.08 Acres Construction DisturbanceSOILS 1545 Shallow Excavations 3.36 Acres Operation DisturbanceSOILS 1545 Shrink Swell 0.75 Acres Construction DisturbanceSOILS 1545 Shrink Swell 0.16 Acres Operation DisturbanceSOILS 1545 Small Commercial Buildings 21.05 Acres Construction DisturbanceSOILS 1545 Small Commercial Buildings 3.58 Acres Operation Disturbance

Page 260: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

SOILS 1545 Water Erosion - Severe 0.32 Acres Construction DisturbanceSOILS 1545 Water Erosion - Severe 0.05 Acres Operation DisturbanceSOILS 1545 Wind Erosion - Severe 1.24 Acres Construction DisturbanceSOILS 1545 Wind Erosion - Severe 0.20 Acres Operation DisturbanceSOILS 1550.1 Compaction Prone 53.67 Acres Construction DisturbanceSOILS 1550.1 Compaction Prone 18.39 Acres Operation DisturbanceSOILS 1550.1 Corrosion Concrete 83.77 Acres Construction DisturbanceSOILS 1550.1 Corrosion Concrete 27.46 Acres Operation DisturbanceSOILS 1550.1 Corrosion Steel 278.47 Acres Construction DisturbanceSOILS 1550.1 Corrosion Steel 90.12 Acres Operation DisturbanceSOILS 1550.1 Hydric 0.90 Acres Construction DisturbanceSOILS 1550.1 Hydric 0.34 Acres Operation DisturbanceSOILS 1550.1 LRP 115.93 Acres Construction DisturbanceSOILS 1550.1 LRP 36.33 Acres Operation DisturbanceSOILS 1550.1 Shallow Bedrock 163.51 Acres Construction DisturbanceSOILS 1550.1 Shallow Bedrock 55.58 Acres Operation DisturbanceSOILS 1550.1 Shallow Excavations 266.68 Acres Construction DisturbanceSOILS 1550.1 Shallow Excavations 86.30 Acres Operation DisturbanceSOILS 1550.1 Shrink Swell 33.12 Acres Construction DisturbanceSOILS 1550.1 Shrink Swell 9.44 Acres Operation DisturbanceSOILS 1550.1 Small Commercial Buildings 267.43 Acres Construction DisturbanceSOILS 1550.1 Small Commercial Buildings 86.55 Acres Operation DisturbanceSOILS 1550.1 Water Erosion - Severe 49.71 Acres Construction DisturbanceSOILS 1550.1 Water Erosion - Severe 14.00 Acres Operation DisturbanceSOILS 1550.1 Wind Erosion - Severe 32.95 Acres Construction DisturbanceSOILS 1550.1 Wind Erosion - Severe 11.50 Acres Operation DisturbanceSOILS 1550.2 Compaction Prone 0.89 Acres Construction DisturbanceSOILS 1550.2 Compaction Prone 0.20 Acres Operation DisturbanceSOILS 1550.2 Corrosion Concrete 0.89 Acres Construction DisturbanceSOILS 1550.2 Corrosion Concrete 0.20 Acres Operation DisturbanceSOILS 1550.2 Corrosion Steel 113.60 Acres Construction DisturbanceSOILS 1550.2 Corrosion Steel 25.23 Acres Operation DisturbanceSOILS 1550.2 LRP 25.24 Acres Construction DisturbanceSOILS 1550.2 LRP 5.70 Acres Operation DisturbanceSOILS 1550.2 Shallow Bedrock 57.86 Acres Construction DisturbanceSOILS 1550.2 Shallow Bedrock 12.96 Acres Operation DisturbanceSOILS 1550.2 Shallow Excavations 104.35 Acres Construction DisturbanceSOILS 1550.2 Shallow Excavations 23.16 Acres Operation DisturbanceSOILS 1550.2 Shrink Swell 0.89 Acres Construction DisturbanceSOILS 1550.2 Shrink Swell 0.20 Acres Operation DisturbanceSOILS 1550.2 Small Commercial Buildings 104.35 Acres Construction DisturbanceSOILS 1550.2 Small Commercial Buildings 23.16 Acres Operation DisturbanceSOILS 1550.2 Water Erosion - Severe 11.48 Acres Construction DisturbanceSOILS 1550.2 Water Erosion - Severe 2.57 Acres Operation DisturbanceSOILS 1550.2 Wind Erosion - Severe 0.49 Acres Construction Disturbance

Page 261: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

SOILS 1550.2 Wind Erosion - Severe 0.13 Acres Operation DisturbanceSOILS 1560 Compaction Prone 0.63 Acres Construction DisturbanceSOILS 1560 Compaction Prone 0.13 Acres Operation DisturbanceSOILS 1560 Corrosion Concrete 0.63 Acres Construction DisturbanceSOILS 1560 Corrosion Concrete 0.13 Acres Operation DisturbanceSOILS 1560 Corrosion Steel 127.49 Acres Construction DisturbanceSOILS 1560 Corrosion Steel 26.05 Acres Operation DisturbanceSOILS 1560 LRP 18.21 Acres Construction DisturbanceSOILS 1560 LRP 3.68 Acres Operation DisturbanceSOILS 1560 Shallow Bedrock 88.44 Acres Construction DisturbanceSOILS 1560 Shallow Bedrock 18.11 Acres Operation DisturbanceSOILS 1560 Shallow Excavations 118.43 Acres Construction DisturbanceSOILS 1560 Shallow Excavations 24.20 Acres Operation DisturbanceSOILS 1560 Shrink Swell 0.63 Acres Construction DisturbanceSOILS 1560 Shrink Swell 0.13 Acres Operation DisturbanceSOILS 1560 Small Commercial Buildings 106.92 Acres Construction DisturbanceSOILS 1560 Small Commercial Buildings 21.83 Acres Operation DisturbanceSOILS 1560 Water Erosion - Severe 0.63 Acres Construction DisturbanceSOILS 1560 Water Erosion - Severe 0.13 Acres Operation DisturbanceSOILS 1560 Wind Erosion - Severe 24.54 Acres Construction DisturbanceSOILS 1560 Wind Erosion - Severe 5.03 Acres Operation DisturbanceSOILS 1570 Compaction Prone 8.43 Acres Construction DisturbanceSOILS 1570 Compaction Prone 1.66 Acres Operation DisturbanceSOILS 1570 Corrosion Concrete 15.75 Acres Construction DisturbanceSOILS 1570 Corrosion Concrete 3.07 Acres Operation DisturbanceSOILS 1570 Corrosion Steel 106.14 Acres Construction DisturbanceSOILS 1570 Corrosion Steel 20.81 Acres Operation DisturbanceSOILS 1570 LRP 25.15 Acres Construction DisturbanceSOILS 1570 LRP 4.87 Acres Operation DisturbanceSOILS 1570 Shallow Bedrock 24.94 Acres Construction DisturbanceSOILS 1570 Shallow Bedrock 4.91 Acres Operation DisturbanceSOILS 1570 Shallow Excavations 81.75 Acres Construction DisturbanceSOILS 1570 Shallow Excavations 16.04 Acres Operation DisturbanceSOILS 1570 Shrink Swell 0.30 Acres Construction DisturbanceSOILS 1570 Shrink Swell 0.06 Acres Operation DisturbanceSOILS 1570 Small Commercial Buildings 71.07 Acres Construction DisturbanceSOILS 1570 Small Commercial Buildings 13.90 Acres Operation DisturbanceSOILS 1570 Water Erosion - Severe 1.71 Acres Construction DisturbanceSOILS 1570 Water Erosion - Severe 0.33 Acres Operation DisturbanceSOILS 1570 Wind Erosion - Severe 26.56 Acres Construction DisturbanceSOILS 1570 Wind Erosion - Severe 5.24 Acres Operation DisturbanceSOILS 1580 Compaction Prone 0.08 Acres Construction DisturbanceSOILS 1580 Compaction Prone 0.01 Acres Operation DisturbanceSOILS 1580 Corrosion Concrete 47.62 Acres Construction DisturbanceSOILS 1580 Corrosion Concrete 7.82 Acres Operation Disturbance

Page 262: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

SOILS 1580 Corrosion Steel 53.09 Acres Construction DisturbanceSOILS 1580 Corrosion Steel 8.78 Acres Operation DisturbanceSOILS 1580 Hydric 0.00 Acres Construction DisturbanceSOILS 1580 Hydric 0.00 Acres Operation DisturbanceSOILS 1580 LRP 47.63 Acres Construction DisturbanceSOILS 1580 LRP 7.83 Acres Operation DisturbanceSOILS 1580 Shallow Bedrock 4.00 Acres Construction DisturbanceSOILS 1580 Shallow Bedrock 0.66 Acres Operation DisturbanceSOILS 1580 Shallow Excavations 21.96 Acres Construction DisturbanceSOILS 1580 Shallow Excavations 3.65 Acres Operation DisturbanceSOILS 1580 Shrink Swell 0.08 Acres Construction DisturbanceSOILS 1580 Shrink Swell 0.01 Acres Operation DisturbanceSOILS 1580 Small Commercial Buildings 52.47 Acres Construction DisturbanceSOILS 1580 Small Commercial Buildings 8.67 Acres Operation DisturbanceSOILS 1580 Water Erosion - Severe 0.10 Acres Construction DisturbanceSOILS 1580 Water Erosion - Severe 0.02 Acres Operation DisturbanceSOILS 1590 Compaction Prone 0.01 Acres Construction DisturbanceSOILS 1590 Compaction Prone 0.00 Acres Operation DisturbanceSOILS 1590 Corrosion Concrete 1.38 Acres Construction DisturbanceSOILS 1590 Corrosion Concrete 0.16 Acres Operation DisturbanceSOILS 1590 Corrosion Steel 24.90 Acres Construction DisturbanceSOILS 1590 Corrosion Steel 3.79 Acres Operation DisturbanceSOILS 1590 LRP 6.22 Acres Construction DisturbanceSOILS 1590 LRP 0.71 Acres Operation DisturbanceSOILS 1590 Shallow Bedrock 23.34 Acres Construction DisturbanceSOILS 1590 Shallow Bedrock 3.57 Acres Operation DisturbanceSOILS 1590 Shallow Excavations 23.48 Acres Construction DisturbanceSOILS 1590 Shallow Excavations 3.62 Acres Operation DisturbanceSOILS 1590 Shrink Swell 0.01 Acres Construction DisturbanceSOILS 1590 Shrink Swell 0.00 Acres Operation DisturbanceSOILS 1590 Small Commercial Buildings 24.86 Acres Construction DisturbanceSOILS 1590 Small Commercial Buildings 3.78 Acres Operation DisturbanceSOILS 1590 Water Erosion - Severe 4.84 Acres Construction DisturbanceSOILS 1590 Water Erosion - Severe 0.55 Acres Operation DisturbanceSOILS 1600 Compaction Prone 0.33 Acres Construction DisturbanceSOILS 1600 Compaction Prone 0.07 Acres Operation DisturbanceSOILS 1600 Corrosion Concrete 0.40 Acres Construction DisturbanceSOILS 1600 Corrosion Concrete 0.10 Acres Operation DisturbanceSOILS 1600 Corrosion Steel 59.68 Acres Construction DisturbanceSOILS 1600 Corrosion Steel 12.50 Acres Operation DisturbanceSOILS 1600 LRP 28.14 Acres Construction DisturbanceSOILS 1600 LRP 5.65 Acres Operation DisturbanceSOILS 1600 Shallow Bedrock 44.01 Acres Construction DisturbanceSOILS 1600 Shallow Bedrock 9.86 Acres Operation DisturbanceSOILS 1600 Shallow Excavations 53.70 Acres Construction Disturbance

Page 263: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

SOILS 1600 Shallow Excavations 11.42 Acres Operation DisturbanceSOILS 1600 Shrink Swell 0.33 Acres Construction DisturbanceSOILS 1600 Shrink Swell 0.07 Acres Operation DisturbanceSOILS 1600 Small Commercial Buildings 53.70 Acres Construction DisturbanceSOILS 1600 Small Commercial Buildings 11.42 Acres Operation DisturbanceSOILS 1600 Water Erosion - Severe 11.43 Acres Construction DisturbanceSOILS 1600 Water Erosion - Severe 3.31 Acres Operation DisturbanceSOILS 1610 Compaction Prone 0.83 Acres Construction DisturbanceSOILS 1610 Compaction Prone 0.18 Acres Operation DisturbanceSOILS 1610 Corrosion Concrete 6.48 Acres Construction DisturbanceSOILS 1610 Corrosion Concrete 1.29 Acres Operation DisturbanceSOILS 1610 Corrosion Steel 158.88 Acres Construction DisturbanceSOILS 1610 Corrosion Steel 30.63 Acres Operation DisturbanceSOILS 1610 Hydric 0.39 Acres Construction DisturbanceSOILS 1610 Hydric 0.10 Acres Operation DisturbanceSOILS 1610 LRP 53.04 Acres Construction DisturbanceSOILS 1610 LRP 10.00 Acres Operation DisturbanceSOILS 1610 Shallow Bedrock 117.00 Acres Construction DisturbanceSOILS 1610 Shallow Bedrock 22.27 Acres Operation DisturbanceSOILS 1610 Shallow Excavations 155.82 Acres Construction DisturbanceSOILS 1610 Shallow Excavations 30.12 Acres Operation DisturbanceSOILS 1610 Shrink Swell 0.83 Acres Construction DisturbanceSOILS 1610 Shrink Swell 0.18 Acres Operation DisturbanceSOILS 1610 Small Commercial Buildings 155.82 Acres Construction DisturbanceSOILS 1610 Small Commercial Buildings 30.12 Acres Operation DisturbanceSOILS 1610 Water Erosion - Severe 45.39 Acres Construction DisturbanceSOILS 1610 Water Erosion - Severe 8.47 Acres Operation DisturbanceSOILS 1620 Corrosion Concrete 17.61 Acres Construction DisturbanceSOILS 1620 Corrosion Concrete 3.08 Acres Operation DisturbanceSOILS 1620 Corrosion Steel 60.85 Acres Construction DisturbanceSOILS 1620 Corrosion Steel 13.10 Acres Operation DisturbanceSOILS 1620 LRP 26.36 Acres Construction DisturbanceSOILS 1620 LRP 4.93 Acres Operation DisturbanceSOILS 1620 Shallow Bedrock 0.98 Acres Construction DisturbanceSOILS 1620 Shallow Bedrock 0.43 Acres Operation DisturbanceSOILS 1620 Shallow Excavations 60.20 Acres Construction DisturbanceSOILS 1620 Shallow Excavations 12.98 Acres Operation DisturbanceSOILS 1620 Small Commercial Buildings 60.17 Acres Construction DisturbanceSOILS 1620 Small Commercial Buildings 12.97 Acres Operation DisturbanceSOILS 1620 Water Erosion - Severe 0.23 Acres Construction DisturbanceSOILS 1620 Water Erosion - Severe 0.11 Acres Operation DisturbanceSOILS 1620 Wind Erosion - Severe 0.14 Acres Construction DisturbanceSOILS 1620 Wind Erosion - Severe 0.06 Acres Operation DisturbanceSOILS 1630 Corrosion Concrete 33.32 Acres Construction DisturbanceSOILS 1630 Corrosion Concrete 6.99 Acres Operation Disturbance

Page 264: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

SOILS 1630 Corrosion Steel 38.42 Acres Construction DisturbanceSOILS 1630 Corrosion Steel 8.21 Acres Operation DisturbanceSOILS 1630 LRP 33.01 Acres Construction DisturbanceSOILS 1630 LRP 7.03 Acres Operation DisturbanceSOILS 1630 Shallow Bedrock 5.13 Acres Construction DisturbanceSOILS 1630 Shallow Bedrock 1.15 Acres Operation DisturbanceSOILS 1630 Shallow Excavations 37.97 Acres Construction DisturbanceSOILS 1630 Shallow Excavations 8.15 Acres Operation DisturbanceSOILS 1630 Small Commercial Buildings 37.97 Acres Construction DisturbanceSOILS 1630 Small Commercial Buildings 8.15 Acres Operation DisturbanceSOILS 1630 Water Erosion - Severe 9.05 Acres Construction DisturbanceSOILS 1630 Water Erosion - Severe 1.79 Acres Operation DisturbanceSOILS 1630 Wind Erosion - Severe 0.41 Acres Construction DisturbanceSOILS 1630 Wind Erosion - Severe 0.07 Acres Operation DisturbanceSOILS 1640 Corrosion Concrete 49.25 Acres Construction DisturbanceSOILS 1640 Corrosion Concrete 7.14 Acres Operation DisturbanceSOILS 1640 Corrosion Steel 49.99 Acres Construction DisturbanceSOILS 1640 Corrosion Steel 7.33 Acres Operation DisturbanceSOILS 1640 LRP 49.54 Acres Construction DisturbanceSOILS 1640 LRP 7.22 Acres Operation DisturbanceSOILS 1640 Shallow Bedrock 33.19 Acres Construction DisturbanceSOILS 1640 Shallow Bedrock 4.76 Acres Operation DisturbanceSOILS 1640 Shallow Excavations 49.99 Acres Construction DisturbanceSOILS 1640 Shallow Excavations 7.33 Acres Operation DisturbanceSOILS 1640 Small Commercial Buildings 49.99 Acres Construction DisturbanceSOILS 1640 Small Commercial Buildings 7.33 Acres Operation DisturbanceSOILS 1640 Wind Erosion - Severe 0.11 Acres Construction DisturbanceSOILS 1640 Wind Erosion - Severe 0.01 Acres Operation DisturbanceSOILS 1650 Corrosion Concrete 33.02 Acres Construction DisturbanceSOILS 1650 Corrosion Concrete 5.28 Acres Operation DisturbanceSOILS 1650 Corrosion Steel 43.49 Acres Construction DisturbanceSOILS 1650 Corrosion Steel 6.95 Acres Operation DisturbanceSOILS 1650 LRP 30.19 Acres Construction DisturbanceSOILS 1650 LRP 4.85 Acres Operation DisturbanceSOILS 1650 Shallow Bedrock 14.98 Acres Construction DisturbanceSOILS 1650 Shallow Bedrock 2.41 Acres Operation DisturbanceSOILS 1650 Shallow Excavations 40.56 Acres Construction DisturbanceSOILS 1650 Shallow Excavations 6.49 Acres Operation DisturbanceSOILS 1650 Small Commercial Buildings 40.56 Acres Construction DisturbanceSOILS 1650 Small Commercial Buildings 6.49 Acres Operation DisturbanceSOILS 1650 Water Erosion - Severe 1.24 Acres Construction DisturbanceSOILS 1650 Water Erosion - Severe 0.22 Acres Operation DisturbanceSOILS 1650 Wind Erosion - Severe 0.72 Acres Construction DisturbanceSOILS 1650 Wind Erosion - Severe 0.12 Acres Operation DisturbanceSOILS 1660 Corrosion Concrete 52.04 Acres Construction Disturbance

Page 265: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

SOILS 1660 Corrosion Concrete 13.74 Acres Operation DisturbanceSOILS 1660 Corrosion Steel 83.61 Acres Construction DisturbanceSOILS 1660 Corrosion Steel 20.52 Acres Operation DisturbanceSOILS 1660 LRP 50.49 Acres Construction DisturbanceSOILS 1660 LRP 14.18 Acres Operation DisturbanceSOILS 1660 Shallow Bedrock 34.02 Acres Construction DisturbanceSOILS 1660 Shallow Bedrock 9.32 Acres Operation DisturbanceSOILS 1660 Shallow Excavations 89.65 Acres Construction DisturbanceSOILS 1660 Shallow Excavations 22.34 Acres Operation DisturbanceSOILS 1660 Small Commercial Buildings 89.65 Acres Construction DisturbanceSOILS 1660 Small Commercial Buildings 22.34 Acres Operation DisturbanceSOILS 1660 Water Erosion - Severe 3.89 Acres Construction DisturbanceSOILS 1660 Water Erosion - Severe 0.81 Acres Operation DisturbanceSOILS 1670 Corrosion Concrete 28.37 Acres Construction DisturbanceSOILS 1670 Corrosion Concrete 8.14 Acres Operation DisturbanceSOILS 1670 Corrosion Steel 50.74 Acres Construction DisturbanceSOILS 1670 Corrosion Steel 14.33 Acres Operation DisturbanceSOILS 1670 Hydric 0.05 Acres Construction DisturbanceSOILS 1670 Hydric 0.02 Acres Operation DisturbanceSOILS 1670 LRP 26.23 Acres Construction DisturbanceSOILS 1670 LRP 7.57 Acres Operation DisturbanceSOILS 1670 Shallow Bedrock 14.93 Acres Construction DisturbanceSOILS 1670 Shallow Bedrock 4.17 Acres Operation DisturbanceSOILS 1670 Shallow Excavations 48.60 Acres Construction DisturbanceSOILS 1670 Shallow Excavations 13.76 Acres Operation DisturbanceSOILS 1670 Small Commercial Buildings 48.60 Acres Construction DisturbanceSOILS 1670 Small Commercial Buildings 13.76 Acres Operation DisturbanceSOILS 1670 Water Erosion - Severe 0.34 Acres Construction DisturbanceSOILS 1670 Water Erosion - Severe 0.14 Acres Operation DisturbanceSOILS 1670 Wind Erosion - Severe 7.79 Acres Construction DisturbanceSOILS 1670 Wind Erosion - Severe 2.09 Acres Operation DisturbanceSOILS 1680 Corrosion Concrete 25.15 Acres Construction DisturbanceSOILS 1680 Corrosion Concrete 6.31 Acres Operation DisturbanceSOILS 1680 Corrosion Steel 44.37 Acres Construction DisturbanceSOILS 1680 Corrosion Steel 11.91 Acres Operation DisturbanceSOILS 1680 LRP 24.37 Acres Construction DisturbanceSOILS 1680 LRP 6.81 Acres Operation DisturbanceSOILS 1680 Shallow Bedrock 21.88 Acres Construction DisturbanceSOILS 1680 Shallow Bedrock 6.55 Acres Operation DisturbanceSOILS 1680 Shallow Excavations 46.20 Acres Construction DisturbanceSOILS 1680 Shallow Excavations 12.50 Acres Operation DisturbanceSOILS 1680 Small Commercial Buildings 46.20 Acres Construction DisturbanceSOILS 1680 Small Commercial Buildings 12.50 Acres Operation DisturbanceSOILS 1680 Water Erosion - Severe 4.80 Acres Construction DisturbanceSOILS 1680 Water Erosion - Severe 1.29 Acres Operation Disturbance

Page 266: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

SOILS 1680 Wind Erosion - Severe 4.90 Acres Construction DisturbanceSOILS 1680 Wind Erosion - Severe 1.24 Acres Operation DisturbanceSOILS 1690 Corrosion Concrete 11.49 Acres Construction DisturbanceSOILS 1690 Corrosion Concrete 3.84 Acres Operation DisturbanceSOILS 1690 Corrosion Steel 58.53 Acres Construction DisturbanceSOILS 1690 Corrosion Steel 16.45 Acres Operation DisturbanceSOILS 1690 LRP 34.11 Acres Construction DisturbanceSOILS 1690 LRP 9.74 Acres Operation DisturbanceSOILS 1690 Shallow Bedrock 53.99 Acres Construction DisturbanceSOILS 1690 Shallow Bedrock 14.18 Acres Operation DisturbanceSOILS 1690 Shallow Excavations 68.06 Acres Construction DisturbanceSOILS 1690 Shallow Excavations 18.55 Acres Operation DisturbanceSOILS 1690 Small Commercial Buildings 68.06 Acres Construction DisturbanceSOILS 1690 Small Commercial Buildings 18.55 Acres Operation DisturbanceSOILS 1690 Water Erosion - Severe 1.89 Acres Construction DisturbanceSOILS 1690 Water Erosion - Severe 0.61 Acres Operation DisturbanceSOILS 1690 Wind Erosion - Severe 2.41 Acres Construction DisturbanceSOILS 1690 Wind Erosion - Severe 0.77 Acres Operation DisturbanceSOILS 1700 Corrosion Steel 13.80 Acres Construction DisturbanceSOILS 1700 Corrosion Steel 2.16 Acres Operation DisturbanceSOILS 1700 LRP 0.42 Acres Construction DisturbanceSOILS 1700 LRP 0.03 Acres Operation DisturbanceSOILS 1700 Shallow Bedrock 18.06 Acres Construction DisturbanceSOILS 1700 Shallow Bedrock 2.53 Acres Operation DisturbanceSOILS 1700 Shallow Excavations 24.44 Acres Construction DisturbanceSOILS 1700 Shallow Excavations 3.79 Acres Operation DisturbanceSOILS 1700 Small Commercial Buildings 24.44 Acres Construction DisturbanceSOILS 1700 Small Commercial Buildings 3.79 Acres Operation DisturbanceSOILS 1710 Corrosion Concrete 9.78 Acres Construction DisturbanceSOILS 1710 Corrosion Concrete 2.39 Acres Operation DisturbanceSOILS 1710 Corrosion Steel 101.09 Acres Construction DisturbanceSOILS 1710 Corrosion Steel 28.44 Acres Operation DisturbanceSOILS 1710 LRP 28.76 Acres Construction DisturbanceSOILS 1710 LRP 8.68 Acres Operation DisturbanceSOILS 1710 Shallow Bedrock 33.62 Acres Construction DisturbanceSOILS 1710 Shallow Bedrock 10.91 Acres Operation DisturbanceSOILS 1710 Shallow Excavations 101.09 Acres Construction DisturbanceSOILS 1710 Shallow Excavations 28.44 Acres Operation DisturbanceSOILS 1710 Small Commercial Buildings 100.96 Acres Construction DisturbanceSOILS 1710 Small Commercial Buildings 28.37 Acres Operation DisturbanceSOILS 1710 Wind Erosion - Severe 30.69 Acres Construction DisturbanceSOILS 1710 Wind Erosion - Severe 7.78 Acres Operation DisturbanceSOILS 1730 Corrosion Steel 112.23 Acres Construction DisturbanceSOILS 1730 Corrosion Steel 39.46 Acres Operation DisturbanceSOILS 1730 LRP 49.60 Acres Construction Disturbance

Page 267: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

SOILS 1730 LRP 16.97 Acres Operation DisturbanceSOILS 1730 Shallow Bedrock 80.42 Acres Construction DisturbanceSOILS 1730 Shallow Bedrock 27.58 Acres Operation DisturbanceSOILS 1730 Shallow Excavations 117.00 Acres Construction DisturbanceSOILS 1730 Shallow Excavations 41.45 Acres Operation DisturbanceSOILS 1730 Small Commercial Buildings 117.00 Acres Construction DisturbanceSOILS 1730 Small Commercial Buildings 41.45 Acres Operation DisturbanceSOILS 1730 Wind Erosion - Severe 9.87 Acres Construction DisturbanceSOILS 1730 Wind Erosion - Severe 2.43 Acres Operation DisturbanceSOILS 1740 Corrosion Steel 35.35 Acres Construction DisturbanceSOILS 1740 Corrosion Steel 15.35 Acres Operation DisturbanceSOILS 1740 LRP 24.64 Acres Construction DisturbanceSOILS 1740 LRP 7.63 Acres Operation DisturbanceSOILS 1740 Shallow Bedrock 39.56 Acres Construction DisturbanceSOILS 1740 Shallow Bedrock 12.72 Acres Operation DisturbanceSOILS 1740 Shallow Excavations 59.48 Acres Construction DisturbanceSOILS 1740 Shallow Excavations 22.85 Acres Operation DisturbanceSOILS 1740 Small Commercial Buildings 59.48 Acres Construction DisturbanceSOILS 1740 Small Commercial Buildings 22.85 Acres Operation DisturbanceSOILS 1750 Corrosion Steel 4.62 Acres Construction DisturbanceSOILS 1750 Corrosion Steel 0.92 Acres Operation DisturbanceSOILS 1750 LRP 0.00 Acres Construction DisturbanceSOILS 1750 LRP 0.00 Acres Operation DisturbanceSOILS 1750 Shallow Bedrock 0.00 Acres Construction DisturbanceSOILS 1750 Shallow Bedrock 0.00 Acres Operation DisturbanceSOILS 1750 Shallow Excavations 4.62 Acres Construction DisturbanceSOILS 1750 Shallow Excavations 0.92 Acres Operation DisturbanceSOILS 1750 Small Commercial Buildings 4.62 Acres Construction DisturbanceSOILS 1750 Small Commercial Buildings 0.92 Acres Operation DisturbanceSOILS 1750 Wind Erosion - Severe 3.33 Acres Construction DisturbanceSOILS 1750 Wind Erosion - Severe 0.66 Acres Operation DisturbanceSOILS 1760 Corrosion Concrete 36.23 Acres Construction DisturbanceSOILS 1760 Corrosion Concrete 7.93 Acres Operation DisturbanceSOILS 1760 Corrosion Steel 88.11 Acres Construction DisturbanceSOILS 1760 Corrosion Steel 18.14 Acres Operation DisturbanceSOILS 1760 LRP 47.43 Acres Construction DisturbanceSOILS 1760 LRP 10.42 Acres Operation DisturbanceSOILS 1760 Shallow Bedrock 27.87 Acres Construction DisturbanceSOILS 1760 Shallow Bedrock 7.18 Acres Operation DisturbanceSOILS 1760 Shallow Excavations 106.81 Acres Construction DisturbanceSOILS 1760 Shallow Excavations 22.94 Acres Operation DisturbanceSOILS 1760 Small Commercial Buildings 97.12 Acres Construction DisturbanceSOILS 1760 Small Commercial Buildings 20.78 Acres Operation DisturbanceSOILS 1760 Wind Erosion - Severe 18.84 Acres Construction DisturbanceSOILS 1760 Wind Erosion - Severe 3.97 Acres Operation Disturbance

Page 268: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

SOILS 1771 Compaction Prone 2.63 Acres Construction DisturbanceSOILS 1771 Compaction Prone 1.08 Acres Operation DisturbanceSOILS 1771 Corrosion Concrete 51.09 Acres Construction DisturbanceSOILS 1771 Corrosion Concrete 7.45 Acres Operation DisturbanceSOILS 1771 Corrosion Steel 201.44 Acres Construction DisturbanceSOILS 1771 Corrosion Steel 36.11 Acres Operation DisturbanceSOILS 1771 Hydric 2.63 Acres Construction DisturbanceSOILS 1771 Hydric 1.08 Acres Operation DisturbanceSOILS 1771 LRP 61.11 Acres Construction DisturbanceSOILS 1771 LRP 10.63 Acres Operation DisturbanceSOILS 1771 Shallow Bedrock 62.95 Acres Construction DisturbanceSOILS 1771 Shallow Bedrock 6.00 Acres Operation DisturbanceSOILS 1771 Shallow Excavations 247.23 Acres Construction DisturbanceSOILS 1771 Shallow Excavations 40.02 Acres Operation DisturbanceSOILS 1771 Shrink Swell 2.63 Acres Construction DisturbanceSOILS 1771 Shrink Swell 1.08 Acres Operation DisturbanceSOILS 1771 Small Commercial Buildings 218.85 Acres Construction DisturbanceSOILS 1771 Small Commercial Buildings 34.39 Acres Operation DisturbanceSOILS 1771 Water Erosion - Severe 0.62 Acres Construction DisturbanceSOILS 1771 Water Erosion - Severe 0.19 Acres Operation DisturbanceSOILS 1771 Wind Erosion - Severe 95.57 Acres Construction DisturbanceSOILS 1771 Wind Erosion - Severe 14.10 Acres Operation DisturbanceSOILS 1772 Corrosion Concrete 0.11 Acres Construction DisturbanceSOILS 1772 Corrosion Concrete 0.04 Acres Operation DisturbanceSOILS 1772 Corrosion Steel 3.45 Acres Construction DisturbanceSOILS 1772 Corrosion Steel 0.41 Acres Operation DisturbanceSOILS 1772 LRP 1.02 Acres Construction DisturbanceSOILS 1772 LRP 0.10 Acres Operation DisturbanceSOILS 1772 Shallow Excavations 3.41 Acres Construction DisturbanceSOILS 1772 Shallow Excavations 0.39 Acres Operation DisturbanceSOILS 1772 Small Commercial Buildings 3.45 Acres Construction DisturbanceSOILS 1772 Small Commercial Buildings 0.41 Acres Operation DisturbanceSOILS 1772 Wind Erosion - Severe 0.18 Acres Construction DisturbanceSOILS 1772 Wind Erosion - Severe 0.07 Acres Operation DisturbanceSOILS 1780 Corrosion Concrete 14.42 Acres Construction DisturbanceSOILS 1780 Corrosion Concrete 3.36 Acres Operation DisturbanceSOILS 1780 Corrosion Steel 39.58 Acres Construction DisturbanceSOILS 1780 Corrosion Steel 9.75 Acres Operation DisturbanceSOILS 1780 LRP 26.14 Acres Construction DisturbanceSOILS 1780 LRP 5.49 Acres Operation DisturbanceSOILS 1780 Shallow Bedrock 23.24 Acres Construction DisturbanceSOILS 1780 Shallow Bedrock 5.54 Acres Operation DisturbanceSOILS 1780 Shallow Excavations 58.93 Acres Construction DisturbanceSOILS 1780 Shallow Excavations 14.48 Acres Operation DisturbanceSOILS 1780 Small Commercial Buildings 58.93 Acres Construction Disturbance

Page 269: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

SOILS 1780 Small Commercial Buildings 14.48 Acres Operation DisturbanceSOILS 1790 Corrosion Concrete 0.07 Acres Construction DisturbanceSOILS 1790 Corrosion Concrete 0.03 Acres Operation DisturbanceSOILS 1790 Corrosion Steel 131.74 Acres Construction DisturbanceSOILS 1790 Corrosion Steel 22.69 Acres Operation DisturbanceSOILS 1790 LRP 47.99 Acres Construction DisturbanceSOILS 1790 LRP 7.85 Acres Operation DisturbanceSOILS 1790 Shallow Bedrock 38.33 Acres Construction DisturbanceSOILS 1790 Shallow Bedrock 8.04 Acres Operation DisturbanceSOILS 1790 Shallow Excavations 143.29 Acres Construction DisturbanceSOILS 1790 Shallow Excavations 24.93 Acres Operation DisturbanceSOILS 1790 Small Commercial Buildings 143.29 Acres Construction DisturbanceSOILS 1790 Small Commercial Buildings 24.93 Acres Operation DisturbanceSOILS 1800 Corrosion Concrete 0.01 Acres Construction DisturbanceSOILS 1800 Corrosion Concrete 0.00 Acres Operation DisturbanceSOILS 1800 Corrosion Steel 15.81 Acres Construction DisturbanceSOILS 1800 Corrosion Steel 1.52 Acres Operation DisturbanceSOILS 1800 Shallow Bedrock 0.07 Acres Construction DisturbanceSOILS 1800 Shallow Bedrock 0.03 Acres Operation DisturbanceSOILS 1800 Shallow Excavations 15.88 Acres Construction DisturbanceSOILS 1800 Shallow Excavations 1.55 Acres Operation DisturbanceSOILS 1800 Small Commercial Buildings 11.34 Acres Construction DisturbanceSOILS 1800 Small Commercial Buildings 1.37 Acres Operation DisturbanceSOILS 1800 Wind Erosion - Severe 4.54 Acres Construction DisturbanceSOILS 1800 Wind Erosion - Severe 0.18 Acres Operation DisturbanceSOILS 1810 Compaction Prone 0.72 Acres Construction DisturbanceSOILS 1810 Compaction Prone 0.14 Acres Operation DisturbanceSOILS 1810 Corrosion Concrete 0.09 Acres Construction DisturbanceSOILS 1810 Corrosion Concrete 0.02 Acres Operation DisturbanceSOILS 1810 Corrosion Steel 89.02 Acres Construction DisturbanceSOILS 1810 Corrosion Steel 15.91 Acres Operation DisturbanceSOILS 1810 LRP 15.72 Acres Construction DisturbanceSOILS 1810 LRP 2.74 Acres Operation DisturbanceSOILS 1810 Shallow Bedrock 5.05 Acres Construction DisturbanceSOILS 1810 Shallow Bedrock 1.04 Acres Operation DisturbanceSOILS 1810 Shallow Excavations 89.95 Acres Construction DisturbanceSOILS 1810 Shallow Excavations 16.11 Acres Operation DisturbanceSOILS 1810 Small Commercial Buildings 89.95 Acres Construction DisturbanceSOILS 1810 Small Commercial Buildings 16.11 Acres Operation DisturbanceSOILS 1820 Compaction Prone 2.79 Acres Construction DisturbanceSOILS 1820 Compaction Prone 1.03 Acres Operation DisturbanceSOILS 1820 Corrosion Concrete 8.75 Acres Construction DisturbanceSOILS 1820 Corrosion Concrete 3.03 Acres Operation DisturbanceSOILS 1820 Corrosion Steel 70.84 Acres Construction DisturbanceSOILS 1820 Corrosion Steel 10.09 Acres Operation Disturbance

Page 270: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

SOILS 1820 Hydric 2.79 Acres Construction DisturbanceSOILS 1820 Hydric 1.03 Acres Operation DisturbanceSOILS 1820 LRP 15.22 Acres Construction DisturbanceSOILS 1820 LRP 3.94 Acres Operation DisturbanceSOILS 1820 Shallow Excavations 69.14 Acres Construction DisturbanceSOILS 1820 Shallow Excavations 9.46 Acres Operation DisturbanceSOILS 1820 Shrink Swell 2.79 Acres Construction DisturbanceSOILS 1820 Shrink Swell 1.03 Acres Operation DisturbanceSOILS 1820 Small Commercial Buildings 68.28 Acres Construction DisturbanceSOILS 1820 Small Commercial Buildings 9.93 Acres Operation DisturbanceSOILS 1820 Wind Erosion - Severe 11.85 Acres Construction DisturbanceSOILS 1820 Wind Erosion - Severe 3.24 Acres Operation DisturbanceSOILS 1830 Corrosion Concrete 0.08 Acres Construction DisturbanceSOILS 1830 Corrosion Concrete 0.03 Acres Operation DisturbanceSOILS 1830 Corrosion Steel 9.60 Acres Construction DisturbanceSOILS 1830 Corrosion Steel 0.66 Acres Operation DisturbanceSOILS 1830 LRP 0.85 Acres Construction DisturbanceSOILS 1830 LRP 0.31 Acres Operation DisturbanceSOILS 1830 Shallow Bedrock 0.14 Acres Construction DisturbanceSOILS 1830 Shallow Bedrock 0.05 Acres Operation DisturbanceSOILS 1830 Shallow Excavations 9.57 Acres Construction DisturbanceSOILS 1830 Shallow Excavations 0.65 Acres Operation DisturbanceSOILS 1830 Small Commercial Buildings 9.60 Acres Construction DisturbanceSOILS 1830 Small Commercial Buildings 0.66 Acres Operation DisturbanceSOILS 1830 Wind Erosion - Severe 0.13 Acres Construction DisturbanceSOILS 1830 Wind Erosion - Severe 0.05 Acres Operation DisturbanceSOILSHUC 1210 1405000704 42.39 Acres Construction DisturbanceSOILSHUC 1210 1405000704 6.62 Acres Operation DisturbanceSOILSHUC 1210 1405000705 14.73 Acres Construction DisturbanceSOILSHUC 1210 1405000705 2.54 Acres Operation DisturbanceSOILSHUC 1210 1406000102 0.74 Acres Construction DisturbanceSOILSHUC 1210 1406000102 0.35 Acres Operation DisturbanceSOILSHUC 1211 1406000102 30.61 Acres Construction DisturbanceSOILSHUC 1211 1406000102 7.13 Acres Operation DisturbanceSOILSHUC 1212 1405000710 0.00 Acres Construction DisturbanceSOILSHUC 1212 1405000710 0.00 Acres Operation DisturbanceSOILSHUC 1212 1406000102 3.66 Acres Construction DisturbanceSOILSHUC 1212 1406000102 1.36 Acres Operation DisturbanceSOILSHUC 1212 1406000105 76.13 Acres Construction DisturbanceSOILSHUC 1212 1406000105 30.56 Acres Operation DisturbanceSOILSHUC 1214 1406000102 16.39 Acres Construction DisturbanceSOILSHUC 1214 1406000102 3.97 Acres Operation DisturbanceSOILSHUC 1215 1405000710 34.11 Acres Construction DisturbanceSOILSHUC 1215 1405000710 7.59 Acres Operation DisturbanceSOILSHUC 1215 1406000102 1.84 Acres Construction Disturbance

Page 271: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

SOILSHUC 1215 1406000102 0.40 Acres Operation DisturbanceSOILSHUC 1215 1406000105 5.66 Acres Construction DisturbanceSOILSHUC 1215 1406000105 1.32 Acres Operation DisturbanceSOILSHUC 1215.05 1405000710 19.88 Acres Construction DisturbanceSOILSHUC 1215.05 1405000710 5.30 Acres Operation DisturbanceSOILSHUC 1215.05 1405000711 15.09 Acres Construction DisturbanceSOILSHUC 1215.05 1405000711 4.49 Acres Operation DisturbanceSOILSHUC 1215.05 1406000105 20.37 Acres Construction DisturbanceSOILSHUC 1215.05 1406000105 6.32 Acres Operation DisturbanceSOILSHUC 1320.05 1406000105 3.60 Acres Construction DisturbanceSOILSHUC 1320.05 1406000105 0.72 Acres Operation DisturbanceSOILSHUC 1320.05 1406000106 5.85 Acres Construction DisturbanceSOILSHUC 1320.05 1406000106 1.06 Acres Operation DisturbanceSOILSHUC 1320.05 1406000309 0.08 Acres Construction DisturbanceSOILSHUC 1320.05 1406000309 0.02 Acres Operation DisturbanceSOILSHUC 1320.05 1406000310 3.15 Acres Construction DisturbanceSOILSHUC 1320.05 1406000310 0.47 Acres Operation DisturbanceSOILSHUC 1320.05 1406000314 0.16 Acres Construction DisturbanceSOILSHUC 1320.05 1406000314 0.05 Acres Operation DisturbanceSOILSHUC 1320.15 1602020101 16.45 Acres Construction DisturbanceSOILSHUC 1320.15 1602020101 5.98 Acres Operation DisturbanceSOILSHUC 1320.15 1602020201 37.95 Acres Construction DisturbanceSOILSHUC 1320.15 1602020201 14.19 Acres Operation DisturbanceSOILSHUC 1320.15 1602020202 69.41 Acres Construction DisturbanceSOILSHUC 1320.15 1602020202 30.76 Acres Operation DisturbanceSOILSHUC 1320.2 1602020101 15.54 Acres Construction DisturbanceSOILSHUC 1320.2 1602020101 6.98 Acres Operation DisturbanceSOILSHUC 1320.2 1603000401 0.00 Acres Construction DisturbanceSOILSHUC 1320.2 1603000401 0.00 Acres Operation DisturbanceSOILSHUC 1321.01 1406000304 17.41 Acres Construction DisturbanceSOILSHUC 1321.01 1406000304 2.98 Acres Operation DisturbanceSOILSHUC 1321.01 1406000308 21.36 Acres Construction DisturbanceSOILSHUC 1321.01 1406000308 3.72 Acres Operation DisturbanceSOILSHUC 1321.01 1406000309 0.31 Acres Construction DisturbanceSOILSHUC 1321.01 1406000309 0.14 Acres Operation DisturbanceSOILSHUC 1321.01 1406000406 19.99 Acres Construction DisturbanceSOILSHUC 1321.01 1406000406 4.63 Acres Operation DisturbanceSOILSHUC 1321.01 1406000408 10.11 Acres Construction DisturbanceSOILSHUC 1321.01 1406000408 1.87 Acres Operation DisturbanceSOILSHUC 1322.01 1406000405 1.99 Acres Construction DisturbanceSOILSHUC 1322.01 1406000405 0.17 Acres Operation DisturbanceSOILSHUC 1322.01 1406000406 0.01 Acres Construction DisturbanceSOILSHUC 1322.01 1406000406 0.00 Acres Operation DisturbanceSOILSHUC 1322.02 1406000405 11.25 Acres Construction DisturbanceSOILSHUC 1322.02 1406000405 2.36 Acres Operation Disturbance

Page 272: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

SOILSHUC 1322.11 1406000405 8.39 Acres Construction DisturbanceSOILSHUC 1322.11 1406000405 1.30 Acres Operation DisturbanceSOILSHUC 1322.12 1406000405 5.17 Acres Construction DisturbanceSOILSHUC 1322.12 1406000405 0.70 Acres Operation DisturbanceSOILSHUC 1322.21 1406000405 4.70 Acres Construction DisturbanceSOILSHUC 1322.21 1406000405 1.16 Acres Operation DisturbanceSOILSHUC 1322.22 1406000404 8.81 Acres Construction DisturbanceSOILSHUC 1322.22 1406000404 1.19 Acres Operation DisturbanceSOILSHUC 1322.22 1406000405 2.05 Acres Construction DisturbanceSOILSHUC 1322.22 1406000405 0.28 Acres Operation DisturbanceSOILSHUC 1322.23 1406000404 0.10 Acres Construction DisturbanceSOILSHUC 1322.23 1406000404 0.01 Acres Operation DisturbanceSOILSHUC 1322.51 1406000405 13.32 Acres Construction DisturbanceSOILSHUC 1322.51 1406000405 2.18 Acres Operation DisturbanceSOILSHUC 1322.52 1406000405 2.23 Acres Construction DisturbanceSOILSHUC 1322.52 1406000405 0.47 Acres Operation DisturbanceSOILSHUC 1322.53 1406000405 5.05 Acres Construction DisturbanceSOILSHUC 1322.53 1406000405 1.34 Acres Operation DisturbanceSOILSHUC 1322.71 1406000404 17.55 Acres Construction DisturbanceSOILSHUC 1322.71 1406000404 4.91 Acres Operation DisturbanceSOILSHUC 1322.71 1406000405 11.30 Acres Construction DisturbanceSOILSHUC 1322.71 1406000405 3.15 Acres Operation DisturbanceSOILSHUC 1323.01 1406000404 2.16 Acres Construction DisturbanceSOILSHUC 1323.01 1406000404 0.53 Acres Operation DisturbanceSOILSHUC 1323.01 1406000405 8.14 Acres Construction DisturbanceSOILSHUC 1323.01 1406000405 2.17 Acres Operation DisturbanceSOILSHUC 1323.02 1406000401 12.38 Acres Construction DisturbanceSOILSHUC 1323.02 1406000401 3.25 Acres Operation DisturbanceSOILSHUC 1323.02 1406000403 37.09 Acres Construction DisturbanceSOILSHUC 1323.02 1406000403 14.24 Acres Operation DisturbanceSOILSHUC 1323.02 1406000404 5.53 Acres Construction DisturbanceSOILSHUC 1323.02 1406000404 2.24 Acres Operation DisturbanceSOILSHUC 1324 1406000401 2.42 Acres Construction DisturbanceSOILSHUC 1324 1406000401 0.81 Acres Operation DisturbanceSOILSHUC 1324 1406000403 8.33 Acres Construction DisturbanceSOILSHUC 1324 1406000403 3.45 Acres Operation DisturbanceSOILSHUC 1324 1602020201 0.39 Acres Construction DisturbanceSOILSHUC 1324 1602020201 0.20 Acres Operation DisturbanceSOILSHUC 1325 1406000401 0.01 Acres Construction DisturbanceSOILSHUC 1325 1406000401 0.00 Acres Operation DisturbanceSOILSHUC 1325 1602020201 7.89 Acres Construction DisturbanceSOILSHUC 1325 1602020201 3.19 Acres Operation DisturbanceSOILSHUC 1325 1602020203 0.05 Acres Construction DisturbanceSOILSHUC 1325 1602020203 0.02 Acres Operation DisturbanceSSAS 1115 100 ft buffer 3.08 Acres Construction Disturbance

Page 273: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

SSAS 1115 100 ft buffer 0.59 Acres Operation DisturbanceSSAS 1115 300 ft buffer 6.61 Acres Construction DisturbanceSSAS 1115 300 ft buffer 1.28 Acres Operation DisturbanceSSAS 1187 100 ft buffer 1.12 Acres Construction DisturbanceSSAS 1187 100 ft buffer 0.45 Acres Operation DisturbanceSSAS 1187 300 ft buffer 2.65 Acres Construction DisturbanceSSAS 1187 300 ft buffer 1.06 Acres Operation DisturbanceSSAS 1190 100 ft buffer 10.68 Acres Construction DisturbanceSSAS 1190 100 ft buffer 3.89 Acres Operation DisturbanceSSAS 1190 300 ft buffer 28.54 Acres Construction DisturbanceSSAS 1190 300 ft buffer 10.15 Acres Operation DisturbanceSSAS 1210 100 ft buffer 0.40 Acres Construction DisturbanceSSAS 1210 100 ft buffer 0.15 Acres Operation DisturbanceSSAS 1210 300 ft buffer 1.14 Acres Construction DisturbanceSSAS 1210 300 ft buffer 0.44 Acres Operation DisturbanceSSAS 1217.01 100 ft buffer 2.29 Acres Construction DisturbanceSSAS 1217.01 100 ft buffer 1.02 Acres Operation DisturbanceSSAS 1217.01 300 ft buffer 4.38 Acres Construction DisturbanceSSAS 1217.01 300 ft buffer 1.95 Acres Operation DisturbanceSSAS 1217.02 100 ft buffer 0.11 Acres Construction DisturbanceSSAS 1217.02 100 ft buffer 0.07 Acres Operation DisturbanceSSAS 1217.02 300 ft buffer 0.36 Acres Construction DisturbanceSSAS 1217.02 300 ft buffer 0.22 Acres Operation DisturbanceSSAS 1217.051 100 ft buffer 1.92 Acres Construction DisturbanceSSAS 1217.051 100 ft buffer 0.82 Acres Operation DisturbanceSSAS 1217.051 300 ft buffer 5.41 Acres Construction DisturbanceSSAS 1217.051 300 ft buffer 2.27 Acres Operation DisturbanceSSAS 1217.052 100 ft buffer 3.72 Acres Construction DisturbanceSSAS 1217.052 100 ft buffer 2.49 Acres Operation DisturbanceSSAS 1217.052 300 ft buffer 10.91 Acres Construction DisturbanceSSAS 1217.052 300 ft buffer 7.30 Acres Operation DisturbanceSSAS 1217.1 100 ft buffer 1.52 Acres Construction DisturbanceSSAS 1217.1 100 ft buffer 0.86 Acres Operation DisturbanceSSAS 1217.1 300 ft buffer 5.50 Acres Construction DisturbanceSSAS 1217.1 300 ft buffer 2.65 Acres Operation DisturbanceSSAS 1217.15 100 ft buffer 2.44 Acres Construction DisturbanceSSAS 1217.15 100 ft buffer 1.44 Acres Operation DisturbanceSSAS 1217.15 300 ft buffer 7.79 Acres Construction DisturbanceSSAS 1217.15 300 ft buffer 4.37 Acres Operation DisturbanceSSAS 1219.2 100 ft buffer 1.20 Acres Construction DisturbanceSSAS 1219.2 100 ft buffer 0.80 Acres Operation DisturbanceSSAS 1219.2 300 ft buffer 3.84 Acres Construction DisturbanceSSAS 1219.2 300 ft buffer 2.49 Acres Operation DisturbanceSSAS 1219.3 100 ft buffer 0.19 Acres Construction DisturbanceSSAS 1219.3 100 ft buffer 0.04 Acres Operation Disturbance

Page 274: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

SSAS 1219.3 300 ft buffer 0.45 Acres Construction DisturbanceSSAS 1219.3 300 ft buffer 0.09 Acres Operation DisturbanceSSAS 1219.4 300 ft buffer 0.01 Acres Construction DisturbanceSSAS 1219.4 300 ft buffer 0.01 Acres Operation DisturbanceSSAS 1219.45 100 ft buffer 0.35 Acres Construction DisturbanceSSAS 1219.45 100 ft buffer 0.23 Acres Operation DisturbanceSSAS 1219.45 300 ft buffer 0.94 Acres Construction DisturbanceSSAS 1219.45 300 ft buffer 0.59 Acres Operation DisturbanceSSAS 1219.5 100 ft buffer 3.90 Acres Construction DisturbanceSSAS 1219.5 100 ft buffer 1.75 Acres Operation DisturbanceSSAS 1219.5 300 ft buffer 10.81 Acres Construction DisturbanceSSAS 1219.5 300 ft buffer 5.01 Acres Operation DisturbanceSSAS 1219.6 100 ft buffer 0.87 Acres Construction DisturbanceSSAS 1219.6 100 ft buffer 0.33 Acres Operation DisturbanceSSAS 1219.6 300 ft buffer 2.48 Acres Construction DisturbanceSSAS 1219.6 300 ft buffer 0.97 Acres Operation DisturbanceSSAS 1220 100 ft buffer 3.58 Acres Construction DisturbanceSSAS 1220 100 ft buffer 1.29 Acres Operation DisturbanceSSAS 1220 300 ft buffer 8.29 Acres Construction DisturbanceSSAS 1220 300 ft buffer 2.98 Acres Operation DisturbanceSSAS 1222.05 100 ft buffer 3.23 Acres Construction DisturbanceSSAS 1222.05 100 ft buffer 0.72 Acres Operation DisturbanceSSAS 1222.05 300 ft buffer 7.11 Acres Construction DisturbanceSSAS 1222.05 300 ft buffer 1.65 Acres Operation DisturbanceSSAS 1222.3 100 ft buffer 0.42 Acres Construction DisturbanceSSAS 1222.3 100 ft buffer 0.17 Acres Operation DisturbanceSSAS 1222.3 300 ft buffer 1.24 Acres Construction DisturbanceSSAS 1222.3 300 ft buffer 0.50 Acres Operation DisturbanceSSAS 1225.2 100 ft buffer 0.53 Acres Construction DisturbanceSSAS 1225.2 100 ft buffer 0.16 Acres Operation DisturbanceSSAS 1225.2 300 ft buffer 1.37 Acres Construction DisturbanceSSAS 1225.2 300 ft buffer 0.42 Acres Operation DisturbanceSSAS 1310 100 ft buffer 2.78 Acres Construction DisturbanceSSAS 1310 100 ft buffer 1.76 Acres Operation DisturbanceSSAS 1310 300 ft buffer 8.25 Acres Construction DisturbanceSSAS 1310 300 ft buffer 5.22 Acres Operation DisturbanceSSAS 1320.05 100 ft buffer 2.78 Acres Construction DisturbanceSSAS 1320.05 100 ft buffer 0.81 Acres Operation DisturbanceSSAS 1320.05 300 ft buffer 6.47 Acres Construction DisturbanceSSAS 1320.05 300 ft buffer 1.90 Acres Operation DisturbanceSSAS 1320.15 100 ft buffer 4.61 Acres Construction DisturbanceSSAS 1320.15 100 ft buffer 3.24 Acres Operation DisturbanceSSAS 1320.15 300 ft buffer 13.33 Acres Construction DisturbanceSSAS 1320.15 300 ft buffer 9.36 Acres Operation DisturbanceSSAS 1320.2 100 ft buffer 0.51 Acres Construction Disturbance

Page 275: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

SSAS 1320.2 100 ft buffer 0.34 Acres Operation DisturbanceSSAS 1320.2 300 ft buffer 1.51 Acres Construction DisturbanceSSAS 1320.2 300 ft buffer 0.99 Acres Operation DisturbanceSSAS 1321.01 100 ft buffer 0.63 Acres Construction DisturbanceSSAS 1321.01 100 ft buffer 0.22 Acres Operation DisturbanceSSAS 1321.01 300 ft buffer 1.52 Acres Construction DisturbanceSSAS 1321.01 300 ft buffer 0.55 Acres Operation DisturbanceSSAS 1322.12 100 ft buffer 0.24 Acres Construction DisturbanceSSAS 1322.12 100 ft buffer 0.06 Acres Operation DisturbanceSSAS 1322.12 300 ft buffer 0.63 Acres Construction DisturbanceSSAS 1322.12 300 ft buffer 0.16 Acres Operation DisturbanceSSAS 1322.53 100 ft buffer 0.27 Acres Construction DisturbanceSSAS 1322.53 100 ft buffer 0.08 Acres Operation DisturbanceSSAS 1322.53 300 ft buffer 0.70 Acres Construction DisturbanceSSAS 1322.53 300 ft buffer 0.21 Acres Operation DisturbanceSSAS 1323.01 100 ft buffer 2.48 Acres Construction DisturbanceSSAS 1323.01 100 ft buffer 1.55 Acres Operation DisturbanceSSAS 1323.01 300 ft buffer 6.98 Acres Construction DisturbanceSSAS 1323.01 300 ft buffer 4.34 Acres Operation DisturbanceSSAS 1324 100 ft buffer 0.01 Acres Construction DisturbanceSSAS 1324 100 ft buffer 0.01 Acres Operation DisturbanceSSAS 1324 300 ft buffer 0.04 Acres Construction DisturbanceSSAS 1324 300 ft buffer 0.03 Acres Operation DisturbanceSSAS 1325 100 ft buffer 0.82 Acres Construction DisturbanceSSAS 1325 100 ft buffer 0.53 Acres Operation DisturbanceSSAS 1325 300 ft buffer 2.42 Acres Construction DisturbanceSSAS 1325 300 ft buffer 1.55 Acres Operation DisturbanceSSAS 1325.1 100 ft buffer 1.42 Acres Construction DisturbanceSSAS 1325.1 100 ft buffer 0.69 Acres Operation DisturbanceSSAS 1325.1 300 ft buffer 3.61 Acres Construction DisturbanceSSAS 1325.1 300 ft buffer 1.74 Acres Operation DisturbanceSSAS 1330.1 100 ft buffer 4.07 Acres Construction DisturbanceSSAS 1330.1 100 ft buffer 1.98 Acres Operation DisturbanceSSAS 1330.1 300 ft buffer 11.66 Acres Construction DisturbanceSSAS 1330.1 300 ft buffer 5.46 Acres Operation DisturbanceSSAS 1340 100 ft buffer 0.37 Acres Construction DisturbanceSSAS 1340 100 ft buffer 0.13 Acres Operation DisturbanceSSAS 1340 300 ft buffer 1.29 Acres Construction DisturbanceSSAS 1340 300 ft buffer 0.39 Acres Operation DisturbanceSSAS 1370 100 ft buffer 0.45 Acres Construction DisturbanceSSAS 1370 100 ft buffer 0.21 Acres Operation DisturbanceSSAS 1370 300 ft buffer 1.04 Acres Construction DisturbanceSSAS 1370 300 ft buffer 0.48 Acres Operation DisturbanceSSAS 1380 100 ft buffer 0.85 Acres Construction DisturbanceSSAS 1380 100 ft buffer 0.31 Acres Operation Disturbance

Page 276: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

SSAS 1380 300 ft buffer 2.08 Acres Construction DisturbanceSSAS 1380 300 ft buffer 0.74 Acres Operation DisturbanceSSAS 1410 100 ft buffer 0.36 Acres Construction DisturbanceSSAS 1410 100 ft buffer 0.11 Acres Operation DisturbanceSSAS 1410 300 ft buffer 1.08 Acres Construction DisturbanceSSAS 1410 300 ft buffer 0.34 Acres Operation DisturbanceSSAS 1460 100 ft buffer 0.56 Acres Construction DisturbanceSSAS 1460 100 ft buffer 0.19 Acres Operation DisturbanceSSAS 1460 300 ft buffer 1.75 Acres Construction DisturbanceSSAS 1460 300 ft buffer 0.57 Acres Operation DisturbanceSSAS 1470 100 ft buffer 0.78 Acres Construction DisturbanceSSAS 1470 100 ft buffer 0.17 Acres Operation DisturbanceSSAS 1470 300 ft buffer 1.99 Acres Construction DisturbanceSSAS 1470 300 ft buffer 0.45 Acres Operation DisturbanceSSAS 1501.1 100 ft buffer 1.47 Acres Construction DisturbanceSSAS 1501.1 100 ft buffer 0.90 Acres Operation DisturbanceSSAS 1501.1 300 ft buffer 4.37 Acres Construction DisturbanceSSAS 1501.1 300 ft buffer 2.68 Acres Operation DisturbanceSSAS 1501.15 100 ft buffer 0.36 Acres Construction DisturbanceSSAS 1501.15 100 ft buffer 0.20 Acres Operation DisturbanceSSAS 1501.15 300 ft buffer 1.08 Acres Construction DisturbanceSSAS 1501.15 300 ft buffer 0.58 Acres Operation DisturbanceSSAS 1503 100 ft buffer 0.18 Acres Construction DisturbanceSSAS 1503 100 ft buffer 0.08 Acres Operation DisturbanceSSAS 1503 300 ft buffer 0.53 Acres Construction DisturbanceSSAS 1503 300 ft buffer 0.22 Acres Operation DisturbanceSSAS 1504 100 ft buffer 0.34 Acres Construction DisturbanceSSAS 1504 100 ft buffer 0.17 Acres Operation DisturbanceSSAS 1504 300 ft buffer 1.01 Acres Construction DisturbanceSSAS 1504 300 ft buffer 0.49 Acres Operation DisturbanceSSAS 1505 100 ft buffer 0.00 Acres Construction DisturbanceSSAS 1505 100 ft buffer 0.00 Acres Operation DisturbanceSSAS 1505 300 ft buffer 0.10 Acres Construction DisturbanceSSAS 1505 300 ft buffer 0.07 Acres Operation DisturbanceSSAS 1510 100 ft buffer 1.56 Acres Construction DisturbanceSSAS 1510 100 ft buffer 0.53 Acres Operation DisturbanceSSAS 1510 300 ft buffer 4.38 Acres Construction DisturbanceSSAS 1510 300 ft buffer 1.53 Acres Operation DisturbanceSSAS 1520 100 ft buffer 0.37 Acres Construction DisturbanceSSAS 1520 100 ft buffer 0.13 Acres Operation DisturbanceSSAS 1520 300 ft buffer 1.10 Acres Construction DisturbanceSSAS 1520 300 ft buffer 0.38 Acres Operation DisturbanceSSAS 1540.1 100 ft buffer 0.41 Acres Construction DisturbanceSSAS 1540.1 100 ft buffer 0.11 Acres Operation DisturbanceSSAS 1540.1 300 ft buffer 1.21 Acres Construction Disturbance

Page 277: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

SSAS 1540.1 300 ft buffer 0.33 Acres Operation DisturbanceSSAS 1540.2 100 ft buffer 0.23 Acres Construction DisturbanceSSAS 1540.2 100 ft buffer 0.07 Acres Operation DisturbanceSSAS 1540.2 300 ft buffer 0.69 Acres Construction DisturbanceSSAS 1540.2 300 ft buffer 0.20 Acres Operation DisturbanceSSAS 1545 100 ft buffer 0.45 Acres Construction DisturbanceSSAS 1545 100 ft buffer 0.09 Acres Operation DisturbanceSSAS 1545 300 ft buffer 1.37 Acres Construction DisturbanceSSAS 1545 300 ft buffer 0.27 Acres Operation DisturbanceSSAS 1550.1 100 ft buffer 0.49 Acres Construction DisturbanceSSAS 1550.1 100 ft buffer 0.23 Acres Operation DisturbanceSSAS 1550.1 300 ft buffer 1.61 Acres Construction DisturbanceSSAS 1550.1 300 ft buffer 0.71 Acres Operation DisturbanceSSAS 1660 100 ft buffer 0.27 Acres Construction DisturbanceSSAS 1660 100 ft buffer 0.12 Acres Operation DisturbanceSSAS 1660 300 ft buffer 0.83 Acres Construction DisturbanceSSAS 1660 300 ft buffer 0.36 Acres Operation DisturbanceSSAS 1670 100 ft buffer 0.04 Acres Construction DisturbanceSSAS 1670 100 ft buffer 0.02 Acres Operation DisturbanceSSAS 1670 300 ft buffer 0.13 Acres Construction DisturbanceSSAS 1670 300 ft buffer 0.05 Acres Operation DisturbanceSSAS 1710 100 ft buffer 0.34 Acres Construction DisturbanceSSAS 1710 100 ft buffer 0.11 Acres Operation DisturbanceSSAS 1710 300 ft buffer 0.99 Acres Construction DisturbanceSSAS 1710 300 ft buffer 0.31 Acres Operation DisturbanceSSAS 1730 100 ft buffer 0.02 Acres Construction DisturbanceSSAS 1730 100 ft buffer 0.00 Acres Operation DisturbanceSSAS 1730 300 ft buffer 0.10 Acres Construction DisturbanceSSAS 1730 300 ft buffer 0.04 Acres Operation DisturbanceSSAS 1750 100 ft buffer 0.14 Acres Construction DisturbanceSSAS 1750 100 ft buffer 0.03 Acres Operation DisturbanceSSAS 1750 300 ft buffer 0.37 Acres Construction DisturbanceSSAS 1750 300 ft buffer 0.07 Acres Operation DisturbanceSSAS 1760 100 ft buffer 0.23 Acres Construction DisturbanceSSAS 1760 100 ft buffer 0.10 Acres Operation DisturbanceSSAS 1760 300 ft buffer 0.70 Acres Construction DisturbanceSSAS 1760 300 ft buffer 0.31 Acres Operation DisturbanceSSAS 1771 100 ft buffer 0.10 Acres Construction DisturbanceSSAS 1771 100 ft buffer 0.04 Acres Operation DisturbanceSSAS 1771 300 ft buffer 0.31 Acres Construction DisturbanceSSAS 1771 300 ft buffer 0.13 Acres Operation DisturbanceSSPS 1502.5 Las Vegas Buckwheat#Habitat Model 4.42 Acres Construction DisturbanceSSPS 1502.5 Las Vegas Buckwheat#Habitat Model 1.82 Acres Operation DisturbanceSSPS 1510 Las Vegas Buckwheat#Habitat Model 8.96 Acres Construction DisturbanceSSPS 1510 Las Vegas Buckwheat#Habitat Model 2.93 Acres Operation Disturbance

Page 278: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

SSPS 1520 Las Vegas Buckwheat#Habitat Model 24.60 Acres Construction DisturbanceSSPS 1520 Las Vegas Buckwheat#Habitat Model 7.89 Acres Operation DisturbanceSSPS 1530 Las Vegas Buckwheat#Habitat Model 2.82 Acres Construction DisturbanceSSPS 1530 Las Vegas Buckwheat#Habitat Model 0.27 Acres Operation DisturbanceSSPS 1540.1 Las Vegas Buckwheat#Habitat Model 23.45 Acres Construction DisturbanceSSPS 1540.1 Las Vegas Buckwheat#Habitat Model 2.61 Acres Operation DisturbanceSSPS 1540.2 Las Vegas Buckwheat#Habitat Model 8.78 Acres Construction DisturbanceSSPS 1540.2 Las Vegas Buckwheat#Habitat Model 1.30 Acres Operation DisturbanceSSPS 1550.1 Las Vegas Buckwheat#Habitat Model 117.85 Acres Construction DisturbanceSSPS 1550.1 Las Vegas Buckwheat#Habitat Model 33.02 Acres Operation DisturbanceSSPS 1550.2 Las Vegas Buckwheat#Habitat Model 58.03 Acres Construction DisturbanceSSPS 1550.2 Las Vegas Buckwheat#Habitat Model 12.68 Acres Operation DisturbanceSSPS 1560 Las Vegas Buckwheat#Habitat Model 13.73 Acres Construction DisturbanceSSPS 1560 Las Vegas Buckwheat#Habitat Model 2.75 Acres Operation DisturbanceSSPS 1570 Las Vegas Buckwheat#Habitat Model 17.06 Acres Construction DisturbanceSSPS 1570 Las Vegas Buckwheat#Habitat Model 3.35 Acres Operation DisturbanceSSPS 1580 Las Vegas Buckwheat#Habitat Model 0.00 Acres Construction DisturbanceSSPS 1580 Las Vegas Buckwheat#Habitat Model 0.00 Acres Operation DisturbanceSSPS 1590 Las Vegas Buckwheat#Habitat Model 2.47 Acres Construction DisturbanceSSPS 1590 Las Vegas Buckwheat#Habitat Model 0.56 Acres Operation DisturbanceSSPS 1600 Las Vegas Buckwheat#Habitat Model 0.14 Acres Construction DisturbanceSSPS 1600 Las Vegas Buckwheat#Habitat Model 0.05 Acres Operation DisturbanceSSPS 1610 Las Vegas Buckwheat#Habitat Model 20.29 Acres Construction DisturbanceSSPS 1610 Las Vegas Buckwheat#Habitat Model 3.76 Acres Operation DisturbanceSSPS 1620 Las Vegas Buckwheat#Habitat Model 18.98 Acres Construction DisturbanceSSPS 1620 Las Vegas Buckwheat#Habitat Model 3.48 Acres Operation DisturbanceSSPS 1630 Las Vegas Buckwheat#Habitat Model 21.04 Acres Construction DisturbanceSSPS 1630 Las Vegas Buckwheat#Habitat Model 4.16 Acres Operation DisturbanceSSPS 1640 Las Vegas Buckwheat#Habitat Model 8.56 Acres Construction DisturbanceSSPS 1640 Las Vegas Buckwheat#Habitat Model 1.17 Acres Operation DisturbanceSSPS 1650 Las Vegas Buckwheat#Habitat Model 7.43 Acres Construction DisturbanceSSPS 1650 Las Vegas Buckwheat#Habitat Model 1.06 Acres Operation DisturbanceSSPS 1660 Las Vegas Buckwheat#Habitat Model 36.33 Acres Construction DisturbanceSSPS 1660 Las Vegas Buckwheat#Habitat Model 11.75 Acres Operation DisturbanceSSPS 1670 Las Vegas Buckwheat#Habitat Model 6.67 Acres Construction DisturbanceSSPS 1670 Las Vegas Buckwheat#Habitat Model 1.72 Acres Operation DisturbanceSSPS 1680 Las Vegas Buckwheat#Habitat Model 16.09 Acres Construction DisturbanceSSPS 1680 Las Vegas Buckwheat#Habitat Model 4.25 Acres Operation DisturbanceSSPS 1690 Las Vegas Buckwheat#Habitat Model 22.93 Acres Construction DisturbanceSSPS 1690 Las Vegas Buckwheat#Habitat Model 5.87 Acres Operation DisturbanceSSPS 1700 Las Vegas Buckwheat#Habitat Model 15.04 Acres Construction DisturbanceSSPS 1700 Las Vegas Buckwheat#Habitat Model 1.83 Acres Operation DisturbanceSSPS 1710 Las Vegas Buckwheat#Habitat Model 0.01 Acres Construction DisturbanceSSPS 1710 Las Vegas Buckwheat#Habitat Model 0.00 Acres Operation DisturbanceSSPS 1730 Las Vegas Buckwheat#Habitat Model 1.22 Acres Construction Disturbance

Page 279: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

SSPS 1730 Las Vegas Buckwheat#Habitat Model 0.32 Acres Operation DisturbanceSSPS 1740 Las Vegas Buckwheat#Habitat Model 0.32 Acres Construction DisturbanceSSPS 1740 Las Vegas Buckwheat#Habitat Model 0.15 Acres Operation DisturbanceSSPS 1760 Las Vegas Buckwheat#Habitat Model 1.14 Acres Construction DisturbanceSSPS 1760 Las Vegas Buckwheat#Habitat Model 0.32 Acres Operation DisturbanceSSPS 1771 Las Vegas Buckwheat#Habitat Model 75.46 Acres Construction DisturbanceSSPS 1771 Las Vegas Buckwheat#Habitat Model 7.28 Acres Operation DisturbanceSSPS 1780 Las Vegas Buckwheat#Habitat Model 1.88 Acres Construction DisturbanceSSPS 1780 Las Vegas Buckwheat#Habitat Model 0.73 Acres Operation DisturbanceSSPS 1790 Las Vegas Buckwheat#Habitat Model 16.47 Acres Construction DisturbanceSSPS 1790 Las Vegas Buckwheat#Habitat Model 2.39 Acres Operation DisturbanceSSPS 1800 Las Vegas Buckwheat#Habitat Model 0.08 Acres Construction DisturbanceSSPS 1800 Las Vegas Buckwheat#Habitat Model 0.03 Acres Operation DisturbanceSSPS 1810 Las Vegas Buckwheat#Habitat Model 0.86 Acres Construction DisturbanceSSPS 1810 Las Vegas Buckwheat#Habitat Model 0.18 Acres Operation DisturbanceSSWS 1030 CanadaLynx 2.18 Acres Construction DisturbanceSSWS 1030 CanadaLynx 0.52 Acres Operation DisturbanceSSWS 1030 WYBC 1.52 Acres Construction DisturbanceSSWS 1030 WYBC 0.39 Acres Operation DisturbanceSSWS 1040 CanadaLynx 0.17 Acres Construction DisturbanceSSWS 1040 CanadaLynx 0.03 Acres Operation DisturbanceSSWS 1100 GrayWolf 0.00 Acres Construction DisturbanceSSWS 1100 GrayWolf 0.00 Acres Operation DisturbanceSSWS 1110 CanadaLynx 0.60 Acres Construction DisturbanceSSWS 1110 CanadaLynx 0.11 Acres Operation DisturbanceSSWS 1110 WYBC 0.96 Acres Construction DisturbanceSSWS 1110 WYBC 0.17 Acres Operation DisturbanceSSWS 1115 CanadaLynx 3.01 Acres Construction DisturbanceSSWS 1115 CanadaLynx 0.59 Acres Operation DisturbanceSSWS 1115 WYBC 0.65 Acres Construction DisturbanceSSWS 1115 WYBC 0.14 Acres Operation DisturbanceSSWS 1120 CanadaLynx 1.37 Acres Construction DisturbanceSSWS 1120 CanadaLynx 0.31 Acres Operation DisturbanceSSWS 1120 WYBC 0.11 Acres Construction DisturbanceSSWS 1120 WYBC 0.03 Acres Operation DisturbanceSSWS 1187 GrayWolf 0.00 Acres Construction DisturbanceSSWS 1187 GrayWolf 0.00 Acres Operation DisturbanceSSWS 1187 WYBC 2.76 Acres Construction DisturbanceSSWS 1187 WYBC 0.81 Acres Operation DisturbanceSSWS 1190 CanadaLynx 8.90 Acres Construction DisturbanceSSWS 1190 CanadaLynx 2.59 Acres Operation DisturbanceSSWS 1190 GrayWolf 2.36 Acres Construction DisturbanceSSWS 1190 GrayWolf 0.75 Acres Operation DisturbanceSSWS 1190 WYBC 5.00 Acres Construction DisturbanceSSWS 1190 WYBC 1.55 Acres Operation Disturbance

Page 280: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

SSWS 1215 GrayWolf 0.08 Acres Construction DisturbanceSSWS 1215 GrayWolf 0.02 Acres Operation DisturbanceSSWS 1217.01 CanadaLynx 30.61 Acres Construction DisturbanceSSWS 1217.01 CanadaLynx 6.71 Acres Operation DisturbanceSSWS 1217.01 GrayWolf 59.42 Acres Construction DisturbanceSSWS 1217.01 GrayWolf 13.46 Acres Operation DisturbanceSSWS 1217.01 Wolverine 30.56 Acres Construction DisturbanceSSWS 1217.01 Wolverine 6.69 Acres Operation DisturbanceSSWS 1217.01 WYBC 2.14 Acres Construction DisturbanceSSWS 1217.01 WYBC 0.66 Acres Operation DisturbanceSSWS 1217.02 CanadaLynx 104.23 Acres Construction DisturbanceSSWS 1217.02 CanadaLynx 30.82 Acres Operation DisturbanceSSWS 1217.02 GrayWolf 135.08 Acres Construction DisturbanceSSWS 1217.02 GrayWolf 41.29 Acres Operation DisturbanceSSWS 1217.02 Wolverine 97.30 Acres Construction DisturbanceSSWS 1217.02 Wolverine 28.27 Acres Operation DisturbanceSSWS 1217.051 CanadaLynx 10.82 Acres Construction DisturbanceSSWS 1217.051 CanadaLynx 3.40 Acres Operation DisturbanceSSWS 1217.051 GrayWolf 28.20 Acres Construction DisturbanceSSWS 1217.051 GrayWolf 7.76 Acres Operation DisturbanceSSWS 1217.051 Wolverine 9.53 Acres Construction DisturbanceSSWS 1217.051 Wolverine 3.09 Acres Operation DisturbanceSSWS 1217.052 CanadaLynx 28.17 Acres Construction DisturbanceSSWS 1217.052 CanadaLynx 10.43 Acres Operation DisturbanceSSWS 1217.052 GrayWolf 88.68 Acres Construction DisturbanceSSWS 1217.052 GrayWolf 35.32 Acres Operation DisturbanceSSWS 1217.052 Wolverine 23.05 Acres Construction DisturbanceSSWS 1217.052 Wolverine 8.87 Acres Operation DisturbanceSSWS 1217.1 CanadaLynx 42.98 Acres Construction DisturbanceSSWS 1217.1 CanadaLynx 9.28 Acres Operation DisturbanceSSWS 1217.1 GrayWolf 66.73 Acres Construction DisturbanceSSWS 1217.1 GrayWolf 14.36 Acres Operation DisturbanceSSWS 1217.1 Wolverine 39.85 Acres Construction DisturbanceSSWS 1217.1 Wolverine 8.57 Acres Operation DisturbanceSSWS 1217.15 CanadaLynx 99.57 Acres Construction DisturbanceSSWS 1217.15 CanadaLynx 32.26 Acres Operation DisturbanceSSWS 1217.15 GrayWolf 398.63 Acres Construction DisturbanceSSWS 1217.15 GrayWolf 132.49 Acres Operation DisturbanceSSWS 1217.15 Wolverine 0.65 Acres Construction DisturbanceSSWS 1217.15 Wolverine 0.22 Acres Operation DisturbanceSSWS 1217.15 WYBC 0.06 Acres Construction DisturbanceSSWS 1217.15 WYBC 0.04 Acres Operation DisturbanceSSWS 1218 CanadaLynx 157.67 Acres Construction DisturbanceSSWS 1218 CanadaLynx 61.08 Acres Operation DisturbanceSSWS 1218 GrayWolf 162.32 Acres Construction Disturbance

Page 281: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

SSWS 1218 GrayWolf 63.32 Acres Operation DisturbanceSSWS 1218 Wolverine 157.67 Acres Construction DisturbanceSSWS 1218 Wolverine 61.08 Acres Operation DisturbanceSSWS 1219.1 CanadaLynx 8.04 Acres Construction DisturbanceSSWS 1219.1 CanadaLynx 1.58 Acres Operation DisturbanceSSWS 1219.1 GrayWolf 8.50 Acres Construction DisturbanceSSWS 1219.1 GrayWolf 1.68 Acres Operation DisturbanceSSWS 1219.1 Wolverine 8.04 Acres Construction DisturbanceSSWS 1219.1 Wolverine 1.58 Acres Operation DisturbanceSSWS 1219.2 CanadaLynx 212.96 Acres Construction DisturbanceSSWS 1219.2 CanadaLynx 72.13 Acres Operation DisturbanceSSWS 1219.2 GrayWolf 252.39 Acres Construction DisturbanceSSWS 1219.2 GrayWolf 85.17 Acres Operation DisturbanceSSWS 1219.2 Wolverine 212.72 Acres Construction DisturbanceSSWS 1219.2 Wolverine 72.06 Acres Operation DisturbanceSSWS 1219.3 CanadaLynx 0.43 Acres Construction DisturbanceSSWS 1219.3 CanadaLynx 0.09 Acres Operation DisturbanceSSWS 1219.3 GrayWolf 5.36 Acres Construction DisturbanceSSWS 1219.3 GrayWolf 1.13 Acres Operation DisturbanceSSWS 1219.3 Wolverine 0.09 Acres Construction DisturbanceSSWS 1219.3 Wolverine 0.02 Acres Operation DisturbanceSSWS 1219.4 GrayWolf 0.11 Acres Construction DisturbanceSSWS 1219.4 GrayWolf 0.04 Acres Operation DisturbanceSSWS 1219.45 CanadaLynx 0.20 Acres Construction DisturbanceSSWS 1219.45 CanadaLynx 0.11 Acres Operation DisturbanceSSWS 1219.45 GrayWolf 0.55 Acres Construction DisturbanceSSWS 1219.45 GrayWolf 0.25 Acres Operation DisturbanceSSWS 1219.45 Wolverine 0.20 Acres Construction DisturbanceSSWS 1219.45 Wolverine 0.11 Acres Operation DisturbanceSSWS 1219.5 CanadaLynx 127.93 Acres Construction DisturbanceSSWS 1219.5 CanadaLynx 42.55 Acres Operation DisturbanceSSWS 1219.5 GrayWolf 181.09 Acres Construction DisturbanceSSWS 1219.5 GrayWolf 60.76 Acres Operation DisturbanceSSWS 1219.5 Wolverine 127.92 Acres Construction DisturbanceSSWS 1219.5 Wolverine 42.54 Acres Operation DisturbanceSSWS 1219.5 WYBC 0.11 Acres Construction DisturbanceSSWS 1219.5 WYBC 0.08 Acres Operation DisturbanceSSWS 1219.6 CanadaLynx 29.78 Acres Construction DisturbanceSSWS 1219.6 CanadaLynx 6.95 Acres Operation DisturbanceSSWS 1219.6 GrayWolf 39.25 Acres Construction DisturbanceSSWS 1219.6 GrayWolf 9.34 Acres Operation DisturbanceSSWS 1219.6 Wolverine 29.73 Acres Construction DisturbanceSSWS 1219.6 Wolverine 6.94 Acres Operation DisturbanceSSWS 1220 GrayWolf 213.48 Acres Construction DisturbanceSSWS 1220 GrayWolf 48.65 Acres Operation Disturbance

Page 282: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

SSWS 1220 WYBC 23.33 Acres Construction DisturbanceSSWS 1220 WYBC 5.18 Acres Operation DisturbanceSSWS 1222.05 CanadaLynx 0.01 Acres Construction DisturbanceSSWS 1222.05 CanadaLynx 0.00 Acres Operation DisturbanceSSWS 1222.05 WYBC 7.17 Acres Construction DisturbanceSSWS 1222.05 WYBC 1.34 Acres Operation DisturbanceSSWS 1222.3 GrayWolf 0.01 Acres Construction DisturbanceSSWS 1222.3 GrayWolf 0.01 Acres Operation DisturbanceSSWS 1222.3 WYBC 0.08 Acres Construction DisturbanceSSWS 1222.3 WYBC 0.04 Acres Operation DisturbanceSSWS 1223 CanadaLynx 1.96 Acres Construction DisturbanceSSWS 1223 CanadaLynx 0.59 Acres Operation DisturbanceSSWS 1223 GrayWolf 3.90 Acres Construction DisturbanceSSWS 1223 GrayWolf 1.37 Acres Operation DisturbanceSSWS 1270 WYBC 0.22 Acres Construction DisturbanceSSWS 1270 WYBC 0.06 Acres Operation DisturbanceSSWS 1310 GrayWolf 415.02 Acres Construction DisturbanceSSWS 1310 GrayWolf 124.84 Acres Operation DisturbanceSSWS 1310 Wolverine 0.06 Acres Construction DisturbanceSSWS 1310 Wolverine 0.04 Acres Operation DisturbanceSSWS 1310 WYBC 0.07 Acres Construction DisturbanceSSWS 1310 WYBC 0.05 Acres Operation DisturbanceSSWS 1320.05 CanadaLynx 1.69 Acres Construction DisturbanceSSWS 1320.05 CanadaLynx 0.26 Acres Operation DisturbanceSSWS 1320.05 GrayWolf 0.04 Acres Construction DisturbanceSSWS 1320.05 GrayWolf 0.01 Acres Operation DisturbanceSSWS 1320.05 WYBC 2.17 Acres Construction DisturbanceSSWS 1320.05 WYBC 0.57 Acres Operation DisturbanceSSWS 1320.15 CanadaLynx 7.87 Acres Construction DisturbanceSSWS 1320.15 CanadaLynx 3.79 Acres Operation DisturbanceSSWS 1320.15 GrayWolf 172.99 Acres Construction DisturbanceSSWS 1320.15 GrayWolf 66.38 Acres Operation DisturbanceSSWS 1320.15 Wolverine 27.76 Acres Construction DisturbanceSSWS 1320.15 Wolverine 10.28 Acres Operation DisturbanceSSWS 1320.2 GrayWolf 68.25 Acres Construction DisturbanceSSWS 1320.2 GrayWolf 25.45 Acres Operation DisturbanceSSWS 1320.2 Wolverine 0.89 Acres Construction DisturbanceSSWS 1320.2 Wolverine 0.58 Acres Operation DisturbanceSSWS 1320.21 GrayWolf 3.14 Acres Construction DisturbanceSSWS 1320.21 GrayWolf 1.12 Acres Operation DisturbanceSSWS 1321.01 CanadaLynx 3.76 Acres Construction DisturbanceSSWS 1321.01 CanadaLynx 0.96 Acres Operation DisturbanceSSWS 1321.01 GrayWolf 0.22 Acres Construction DisturbanceSSWS 1321.01 GrayWolf 0.09 Acres Operation DisturbanceSSWS 1321.01 WYBC 0.57 Acres Construction Disturbance

Page 283: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

SSWS 1321.01 WYBC 0.26 Acres Operation DisturbanceSSWS 1322.02 GrayWolf 0.04 Acres Construction DisturbanceSSWS 1322.02 GrayWolf 0.01 Acres Operation DisturbanceSSWS 1322.11 GrayWolf 0.15 Acres Construction DisturbanceSSWS 1322.11 GrayWolf 0.02 Acres Operation DisturbanceSSWS 1322.12 CanadaLynx 0.19 Acres Construction DisturbanceSSWS 1322.12 CanadaLynx 0.03 Acres Operation DisturbanceSSWS 1322.21 WYBC 0.19 Acres Construction DisturbanceSSWS 1322.21 WYBC 0.05 Acres Operation DisturbanceSSWS 1322.22 GrayWolf 0.01 Acres Construction DisturbanceSSWS 1322.22 GrayWolf 0.00 Acres Operation DisturbanceSSWS 1322.23 CanadaLynx 0.39 Acres Construction DisturbanceSSWS 1322.23 CanadaLynx 0.09 Acres Operation DisturbanceSSWS 1322.23 GrayWolf 5.62 Acres Construction DisturbanceSSWS 1322.23 GrayWolf 1.45 Acres Operation DisturbanceSSWS 1322.51 GrayWolf 0.03 Acres Construction DisturbanceSSWS 1322.51 GrayWolf 0.00 Acres Operation DisturbanceSSWS 1322.53 CanadaLynx 0.02 Acres Construction DisturbanceSSWS 1322.53 CanadaLynx 0.01 Acres Operation DisturbanceSSWS 1322.71 CanadaLynx 1.15 Acres Construction DisturbanceSSWS 1322.71 CanadaLynx 0.33 Acres Operation DisturbanceSSWS 1322.71 GrayWolf 0.38 Acres Construction DisturbanceSSWS 1322.71 GrayWolf 0.11 Acres Operation DisturbanceSSWS 1323.01 CanadaLynx 0.52 Acres Construction DisturbanceSSWS 1323.01 CanadaLynx 0.13 Acres Operation DisturbanceSSWS 1323.01 GrayWolf 4.06 Acres Construction DisturbanceSSWS 1323.01 GrayWolf 1.03 Acres Operation DisturbanceSSWS 1323.02 CanadaLynx 87.98 Acres Construction DisturbanceSSWS 1323.02 CanadaLynx 29.17 Acres Operation DisturbanceSSWS 1323.02 GrayWolf 89.33 Acres Construction DisturbanceSSWS 1323.02 GrayWolf 29.90 Acres Operation DisturbanceSSWS 1324 CanadaLynx 43.71 Acres Construction DisturbanceSSWS 1324 CanadaLynx 17.66 Acres Operation DisturbanceSSWS 1324 GrayWolf 49.28 Acres Construction DisturbanceSSWS 1324 GrayWolf 19.95 Acres Operation DisturbanceSSWS 1324 Wolverine 4.61 Acres Construction DisturbanceSSWS 1324 Wolverine 2.06 Acres Operation DisturbanceSSWS 1325 CanadaLynx 26.86 Acres Construction DisturbanceSSWS 1325 CanadaLynx 10.36 Acres Operation DisturbanceSSWS 1325 GrayWolf 60.36 Acres Construction DisturbanceSSWS 1325 GrayWolf 23.40 Acres Operation DisturbanceSSWS 1325 Wolverine 25.41 Acres Construction DisturbanceSSWS 1325 Wolverine 9.78 Acres Operation DisturbanceSSWS 1325.1 CanadaLynx 94.85 Acres Construction DisturbanceSSWS 1325.1 CanadaLynx 15.23 Acres Operation Disturbance

Page 284: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

SSWS 1325.1 GrayWolf 101.22 Acres Construction DisturbanceSSWS 1325.1 GrayWolf 15.65 Acres Operation DisturbanceSSWS 1325.1 Wolverine 88.63 Acres Construction DisturbanceSSWS 1325.1 Wolverine 13.77 Acres Operation DisturbanceSSWS 1325.1 WYBC 1.82 Acres Construction DisturbanceSSWS 1325.1 WYBC 0.51 Acres Operation DisturbanceSSWS 1325.2 CanadaLynx 21.00 Acres Construction DisturbanceSSWS 1325.2 CanadaLynx 7.37 Acres Operation DisturbanceSSWS 1325.2 GrayWolf 27.22 Acres Construction DisturbanceSSWS 1325.2 GrayWolf 10.08 Acres Operation DisturbanceSSWS 1325.2 Wolverine 21.00 Acres Construction DisturbanceSSWS 1325.2 Wolverine 7.37 Acres Operation DisturbanceSSWS 1330.1 CaliforniaCondor_Foraging 218.94 Acres Construction DisturbanceSSWS 1330.1 CaliforniaCondor_Foraging 54.10 Acres Operation DisturbanceSSWS 1330.1 CaliforniaCondor_Nesting 0.44 Acres Construction DisturbanceSSWS 1330.1 CaliforniaCondor_Nesting 0.06 Acres Operation DisturbanceSSWS 1330.1 GrayWolf 171.79 Acres Construction DisturbanceSSWS 1330.1 GrayWolf 35.31 Acres Operation DisturbanceSSWS 1330.1 WYBC 0.82 Acres Construction DisturbanceSSWS 1330.1 WYBC 0.16 Acres Operation DisturbanceSSWS 1340 GrayWolf 18.12 Acres Construction DisturbanceSSWS 1340 GrayWolf 2.97 Acres Operation DisturbanceSSWS 1340 Wolverine 0.47 Acres Construction DisturbanceSSWS 1340 Wolverine 0.09 Acres Operation DisturbanceSSWS 1350 GrayWolf 28.63 Acres Construction DisturbanceSSWS 1350 GrayWolf 10.17 Acres Operation DisturbanceSSWS 1350 Wolverine 1.20 Acres Construction DisturbanceSSWS 1350 Wolverine 0.50 Acres Operation DisturbanceSSWS 1360 CaliforniaCondor_Foraging 5.92 Acres Construction DisturbanceSSWS 1360 CaliforniaCondor_Foraging 1.36 Acres Operation DisturbanceSSWS 1360 GrayWolf 0.74 Acres Construction DisturbanceSSWS 1360 GrayWolf 0.17 Acres Operation DisturbanceSSWS 1370 GrayWolf 1.08 Acres Construction DisturbanceSSWS 1370 GrayWolf 0.23 Acres Operation DisturbanceSSWS 1380 CaliforniaCondor_Foraging 147.90 Acres Construction DisturbanceSSWS 1380 CaliforniaCondor_Foraging 23.78 Acres Operation DisturbanceSSWS 1380 GrayWolf 2.80 Acres Construction DisturbanceSSWS 1380 GrayWolf 0.83 Acres Operation DisturbanceSSWS 1390 CaliforniaCondor_Foraging 53.21 Acres Construction DisturbanceSSWS 1390 CaliforniaCondor_Foraging 8.81 Acres Operation DisturbanceSSWS 1400 CaliforniaCondor_Foraging 147.62 Acres Construction DisturbanceSSWS 1400 CaliforniaCondor_Foraging 32.01 Acres Operation DisturbanceSSWS 1400 CaliforniaCondor_Nesting 0.01 Acres Construction DisturbanceSSWS 1400 CaliforniaCondor_Nesting 0.00 Acres Operation DisturbanceSSWS 1400 GrayWolf 13.01 Acres Construction Disturbance

Page 285: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

SSWS 1400 GrayWolf 3.13 Acres Operation DisturbanceSSWS 1410 CaliforniaCondor_Foraging 493.34 Acres Construction DisturbanceSSWS 1410 CaliforniaCondor_Foraging 100.72 Acres Operation DisturbanceSSWS 1410 CaliforniaCondor_Nesting 0.20 Acres Construction DisturbanceSSWS 1410 CaliforniaCondor_Nesting 0.04 Acres Operation DisturbanceSSWS 1410 GrayWolf 20.97 Acres Construction DisturbanceSSWS 1410 GrayWolf 3.36 Acres Operation DisturbanceSSWS 1420 CaliforniaCondor_Foraging 89.92 Acres Construction DisturbanceSSWS 1420 CaliforniaCondor_Foraging 13.03 Acres Operation DisturbanceSSWS 1430 CaliforniaCondor_Foraging 202.71 Acres Construction DisturbanceSSWS 1430 CaliforniaCondor_Foraging 40.57 Acres Operation DisturbanceSSWS 1430 CaliforniaCondor_Nesting 0.34 Acres Construction DisturbanceSSWS 1430 CaliforniaCondor_Nesting 0.07 Acres Operation DisturbanceSSWS 1440 CaliforniaCondor_Foraging 118.82 Acres Construction DisturbanceSSWS 1440 CaliforniaCondor_Foraging 15.67 Acres Operation DisturbanceSSWS 1450 CaliforniaCondor_Foraging 92.40 Acres Construction DisturbanceSSWS 1450 CaliforniaCondor_Foraging 11.56 Acres Operation DisturbanceSSWS 1450 CaliforniaCondor_Nesting 0.03 Acres Construction DisturbanceSSWS 1450 CaliforniaCondor_Nesting 0.01 Acres Operation DisturbanceSSWS 1460 CaliforniaCondor_Foraging 409.76 Acres Construction DisturbanceSSWS 1460 CaliforniaCondor_Foraging 65.74 Acres Operation DisturbanceSSWS 1460 CaliforniaCondor_Nesting 0.03 Acres Construction DisturbanceSSWS 1460 CaliforniaCondor_Nesting 0.01 Acres Operation DisturbanceSSWS 1470 CaliforniaCondor_Foraging 469.64 Acres Construction DisturbanceSSWS 1470 CaliforniaCondor_Foraging 98.73 Acres Operation DisturbanceSSWS 1470 CaliforniaCondor_Nesting 0.93 Acres Construction DisturbanceSSWS 1470 CaliforniaCondor_Nesting 0.19 Acres Operation DisturbanceSSWS 1480 CaliforniaCondor_Foraging 763.44 Acres Construction DisturbanceSSWS 1480 CaliforniaCondor_Foraging 129.32 Acres Operation DisturbanceSSWS 1480 CaliforniaCondor_Nesting 0.98 Acres Construction DisturbanceSSWS 1480 CaliforniaCondor_Nesting 0.27 Acres Operation DisturbanceSSWS 1490 CaliforniaCondor_Foraging 166.37 Acres Construction DisturbanceSSWS 1490 CaliforniaCondor_Foraging 34.07 Acres Operation DisturbanceSSWS 1490.05 CaliforniaCondor_Foraging 528.28 Acres Construction DisturbanceSSWS 1490.05 CaliforniaCondor_Foraging 102.49 Acres Operation DisturbanceSSWS 1490.05 CaliforniaCondor_Nesting 0.02 Acres Construction DisturbanceSSWS 1490.05 CaliforniaCondor_Nesting 0.00 Acres Operation DisturbanceSSWS 1490.05 SWFL 0.12 Acres Construction DisturbanceSSWS 1490.05 SWFL 0.02 Acres Operation DisturbanceSSWS 1495 CaliforniaCondor_Foraging 98.65 Acres Construction DisturbanceSSWS 1495 CaliforniaCondor_Foraging 18.49 Acres Operation DisturbanceSSWS 1495 SWFL 0.15 Acres Construction DisturbanceSSWS 1495 SWFL 0.03 Acres Operation DisturbanceSSWS 1500 CaliforniaCondor_Foraging 222.21 Acres Construction DisturbanceSSWS 1500 CaliforniaCondor_Foraging 31.72 Acres Operation Disturbance

Page 286: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

SSWS 1500 CaliforniaCondor_Nesting 0.00 Acres Construction DisturbanceSSWS 1500 CaliforniaCondor_Nesting 0.00 Acres Operation DisturbanceSSWS 1500.02 CaliforniaCondor_Foraging 215.07 Acres Construction DisturbanceSSWS 1500.02 CaliforniaCondor_Foraging 31.08 Acres Operation DisturbanceSSWS 1500.02 CaliforniaCondor_Nesting 0.01 Acres Construction DisturbanceSSWS 1500.02 CaliforniaCondor_Nesting 0.00 Acres Operation DisturbanceSSWS 1500.02 SWFL 0.00 Acres Construction DisturbanceSSWS 1500.02 SWFL 0.00 Acres Operation DisturbanceSSWS 1500.05 CaliforniaCondor_Foraging 152.96 Acres Construction DisturbanceSSWS 1500.05 CaliforniaCondor_Foraging 40.64 Acres Operation DisturbanceSSWS 1500.05 CaliforniaCondor_Nesting 0.11 Acres Construction DisturbanceSSWS 1500.05 CaliforniaCondor_Nesting 0.03 Acres Operation DisturbanceSSWS 1500.05 SWFL 0.36 Acres Construction DisturbanceSSWS 1500.05 SWFL 0.21 Acres Operation DisturbanceSSWS 1501.1 CaliforniaCondor_Foraging 261.70 Acres Construction DisturbanceSSWS 1501.1 CaliforniaCondor_Foraging 74.38 Acres Operation DisturbanceSSWS 1501.1 WYBC 0.66 Acres Construction DisturbanceSSWS 1501.1 WYBC 0.26 Acres Operation DisturbanceSSWS 1501.15 CaliforniaCondor_Foraging 20.43 Acres Construction DisturbanceSSWS 1501.15 CaliforniaCondor_Foraging 4.52 Acres Operation DisturbanceSSWS 1502.5 CaliforniaCondor_Foraging 575.53 Acres Construction DisturbanceSSWS 1502.5 CaliforniaCondor_Foraging 156.56 Acres Operation DisturbanceSSWS 1502.5 CaliforniaCondor_Nesting 0.47 Acres Construction DisturbanceSSWS 1502.5 CaliforniaCondor_Nesting 0.22 Acres Operation DisturbanceSSWS 1503 CaliforniaCondor_Foraging 114.83 Acres Construction DisturbanceSSWS 1503 CaliforniaCondor_Foraging 32.34 Acres Operation DisturbanceSSWS 1503.5 CaliforniaCondor_Foraging 13.90 Acres Construction DisturbanceSSWS 1503.5 CaliforniaCondor_Foraging 1.93 Acres Operation DisturbanceSSWS 1504 CaliforniaCondor_Foraging 108.19 Acres Construction DisturbanceSSWS 1504 CaliforniaCondor_Foraging 34.25 Acres Operation DisturbanceSSWS 1505 CaliforniaCondor_Foraging 190.49 Acres Construction DisturbanceSSWS 1505 CaliforniaCondor_Foraging 73.57 Acres Operation DisturbanceSSWS 1505 WYBC 1.99 Acres Construction DisturbanceSSWS 1505 WYBC 0.62 Acres Operation DisturbanceSSWS 1506 CaliforniaCondor_Foraging 461.25 Acres Construction DisturbanceSSWS 1506 CaliforniaCondor_Foraging 113.83 Acres Operation DisturbanceSSWS 1506 CaliforniaCondor_Nesting 0.02 Acres Construction DisturbanceSSWS 1506 CaliforniaCondor_Nesting 0.01 Acres Operation DisturbanceSSWS 1506 SWFL 0.57 Acres Construction DisturbanceSSWS 1506 SWFL 0.26 Acres Operation DisturbanceSSWS 1506 WYBC 4.80 Acres Construction DisturbanceSSWS 1506 WYBC 0.98 Acres Operation DisturbanceSSWS 1510 CaliforniaCondor_Foraging 799.51 Acres Construction DisturbanceSSWS 1510 CaliforniaCondor_Foraging 202.35 Acres Operation DisturbanceSSWS 1510 CaliforniaCondor_Nesting 1.43 Acres Construction Disturbance

Page 287: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

SSWS 1510 CaliforniaCondor_Nesting 0.56 Acres Operation DisturbanceSSWS 1510 SWFL 24.22 Acres Construction DisturbanceSSWS 1510 SWFL 5.09 Acres Operation DisturbanceSSWS 1510 WYBC 17.58 Acres Construction DisturbanceSSWS 1510 WYBC 3.63 Acres Operation DisturbanceSSWS 1520 CaliforniaCondor_Foraging 1566.40 Acres Construction DisturbanceSSWS 1520 CaliforniaCondor_Foraging 354.10 Acres Operation DisturbanceSSWS 1520 CaliforniaCondor_Nesting 15.28 Acres Construction DisturbanceSSWS 1520 CaliforniaCondor_Nesting 4.36 Acres Operation DisturbanceSSWS 1520 SWFL 0.53 Acres Construction DisturbanceSSWS 1520 SWFL 0.10 Acres Operation DisturbanceSSWS 1520 WYBC 0.12 Acres Construction DisturbanceSSWS 1520 WYBC 0.02 Acres Operation DisturbanceSSWS 1530 CaliforniaCondor_Foraging 86.67 Acres Construction DisturbanceSSWS 1530 CaliforniaCondor_Foraging 18.44 Acres Operation DisturbanceSSWS 1530 CaliforniaCondor_Nesting 0.28 Acres Construction DisturbanceSSWS 1530 CaliforniaCondor_Nesting 0.07 Acres Operation DisturbanceSSWS 1540.1 CaliforniaCondor_Foraging 254.81 Acres Construction DisturbanceSSWS 1540.1 CaliforniaCondor_Foraging 36.90 Acres Operation DisturbanceSSWS 1540.1 CaliforniaCondor_Nesting 1.19 Acres Construction DisturbanceSSWS 1540.1 CaliforniaCondor_Nesting 0.35 Acres Operation DisturbanceSSWS 1540.1 SWFL 1.04 Acres Construction DisturbanceSSWS 1540.1 SWFL 0.22 Acres Operation DisturbanceSSWS 1540.1 WYBC 0.91 Acres Construction DisturbanceSSWS 1540.1 WYBC 0.17 Acres Operation DisturbanceSSWS 1540.2 CaliforniaCondor_Foraging 228.29 Acres Construction DisturbanceSSWS 1540.2 CaliforniaCondor_Foraging 30.91 Acres Operation DisturbanceSSWS 1540.2 CaliforniaCondor_Nesting 0.27 Acres Construction DisturbanceSSWS 1540.2 CaliforniaCondor_Nesting 0.07 Acres Operation DisturbanceSSWS 1540.2 SWFL 1.59 Acres Construction DisturbanceSSWS 1540.2 SWFL 0.29 Acres Operation DisturbanceSSWS 1540.2 WYBC 0.42 Acres Construction DisturbanceSSWS 1540.2 WYBC 0.15 Acres Operation DisturbanceSSWS 1540.2 YumaClapperRail 0.19 Acres Construction DisturbanceSSWS 1540.2 YumaClapperRail 0.07 Acres Operation DisturbanceSSWS 1545 CaliforniaCondor_Foraging 54.29 Acres Construction DisturbanceSSWS 1545 CaliforniaCondor_Foraging 8.98 Acres Operation DisturbanceSSWS 1545 CaliforniaCondor_Nesting 0.18 Acres Construction DisturbanceSSWS 1545 CaliforniaCondor_Nesting 0.03 Acres Operation DisturbanceSSWS 1545 SWFL 1.32 Acres Construction DisturbanceSSWS 1545 SWFL 0.27 Acres Operation DisturbanceSSWS 1545 WYBC 1.26 Acres Construction DisturbanceSSWS 1545 WYBC 0.26 Acres Operation DisturbanceSSWS 1550.1 CaliforniaCondor_Foraging 351.56 Acres Construction DisturbanceSSWS 1550.1 CaliforniaCondor_Foraging 111.28 Acres Operation Disturbance

Page 288: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

SSWS 1550.1 CaliforniaCondor_Nesting 15.38 Acres Construction DisturbanceSSWS 1550.1 CaliforniaCondor_Nesting 4.20 Acres Operation DisturbanceSSWS 1550.1 SWFL 6.38 Acres Construction DisturbanceSSWS 1550.1 SWFL 1.68 Acres Operation DisturbanceSSWS 1550.1 WYBC 6.34 Acres Construction DisturbanceSSWS 1550.1 WYBC 1.67 Acres Operation DisturbanceSSWS 1550.2 CaliforniaCondor_Foraging 145.14 Acres Construction DisturbanceSSWS 1550.2 CaliforniaCondor_Foraging 32.36 Acres Operation DisturbanceSSWS 1550.2 CaliforniaCondor_Nesting 0.52 Acres Construction DisturbanceSSWS 1550.2 CaliforniaCondor_Nesting 0.13 Acres Operation DisturbanceSSWS 1560 CaliforniaCondor_Foraging 143.32 Acres Construction DisturbanceSSWS 1560 CaliforniaCondor_Foraging 29.28 Acres Operation DisturbanceSSWS 1560 CaliforniaCondor_Nesting 0.00 Acres Construction DisturbanceSSWS 1560 CaliforniaCondor_Nesting 0.00 Acres Operation DisturbanceSSWS 1560 SWFL 0.00 Acres Construction DisturbanceSSWS 1560 SWFL 0.00 Acres Operation DisturbanceSSWS 1570 CaliforniaCondor_Foraging 122.38 Acres Construction DisturbanceSSWS 1570 CaliforniaCondor_Foraging 24.01 Acres Operation DisturbanceSSWS 1570 SWFL 0.34 Acres Construction DisturbanceSSWS 1570 SWFL 0.07 Acres Operation DisturbanceSSWS 1580 CaliforniaCondor_Foraging 53.14 Acres Construction DisturbanceSSWS 1580 CaliforniaCondor_Foraging 8.78 Acres Operation DisturbanceSSWS 1590 CaliforniaCondor_Foraging 80.98 Acres Construction DisturbanceSSWS 1590 CaliforniaCondor_Foraging 11.55 Acres Operation DisturbanceSSWS 1590 CaliforniaCondor_Nesting 0.14 Acres Construction DisturbanceSSWS 1590 CaliforniaCondor_Nesting 0.05 Acres Operation DisturbanceSSWS 1590 SWFL 0.03 Acres Construction DisturbanceSSWS 1590 SWFL 0.01 Acres Operation DisturbanceSSWS 1600 CaliforniaCondor_Foraging 88.22 Acres Construction DisturbanceSSWS 1600 CaliforniaCondor_Foraging 20.88 Acres Operation DisturbanceSSWS 1600 CaliforniaCondor_Nesting 2.12 Acres Construction DisturbanceSSWS 1600 CaliforniaCondor_Nesting 0.83 Acres Operation DisturbanceSSWS 1610 CaliforniaCondor_Foraging 270.79 Acres Construction DisturbanceSSWS 1610 CaliforniaCondor_Foraging 51.59 Acres Operation DisturbanceSSWS 1610 CaliforniaCondor_Nesting 7.92 Acres Construction DisturbanceSSWS 1610 CaliforniaCondor_Nesting 1.63 Acres Operation DisturbanceSSWS 1610 SWFL 0.00 Acres Construction DisturbanceSSWS 1610 SWFL 0.00 Acres Operation DisturbanceSSWS 1610 YumaClapperRail 0.00 Acres Construction DisturbanceSSWS 1610 YumaClapperRail 0.00 Acres Operation DisturbanceSSWS 1620 CaliforniaCondor_Foraging 70.81 Acres Construction DisturbanceSSWS 1620 CaliforniaCondor_Foraging 15.36 Acres Operation DisturbanceSSWS 1620 CaliforniaCondor_Nesting 0.03 Acres Construction DisturbanceSSWS 1620 CaliforniaCondor_Nesting 0.01 Acres Operation DisturbanceSSWS 1630 CaliforniaCondor_Foraging 47.49 Acres Construction Disturbance

Page 289: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

SSWS 1630 CaliforniaCondor_Foraging 10.21 Acres Operation DisturbanceSSWS 1630 CaliforniaCondor_Nesting 1.01 Acres Construction DisturbanceSSWS 1630 CaliforniaCondor_Nesting 0.29 Acres Operation DisturbanceSSWS 1630 SWFL 0.00 Acres Construction DisturbanceSSWS 1630 SWFL 0.00 Acres Operation DisturbanceSSWS 1640 CaliforniaCondor_Foraging 59.68 Acres Construction DisturbanceSSWS 1640 CaliforniaCondor_Foraging 8.89 Acres Operation DisturbanceSSWS 1640 CaliforniaCondor_Nesting 10.30 Acres Construction DisturbanceSSWS 1640 CaliforniaCondor_Nesting 1.50 Acres Operation DisturbanceSSWS 1640 SWFL 0.02 Acres Construction DisturbanceSSWS 1640 SWFL 0.00 Acres Operation DisturbanceSSWS 1640 YumaClapperRail 0.01 Acres Construction DisturbanceSSWS 1640 YumaClapperRail 0.00 Acres Operation DisturbanceSSWS 1650 CaliforniaCondor_Foraging 51.11 Acres Construction DisturbanceSSWS 1650 CaliforniaCondor_Foraging 8.17 Acres Operation DisturbanceSSWS 1650 CaliforniaCondor_Nesting 1.49 Acres Construction DisturbanceSSWS 1650 CaliforniaCondor_Nesting 0.20 Acres Operation DisturbanceSSWS 1660 CaliforniaCondor_Foraging 126.77 Acres Construction DisturbanceSSWS 1660 CaliforniaCondor_Foraging 31.45 Acres Operation DisturbanceSSWS 1660 CaliforniaCondor_Nesting 11.93 Acres Construction DisturbanceSSWS 1660 CaliforniaCondor_Nesting 2.69 Acres Operation DisturbanceSSWS 1660 SWFL 0.01 Acres Construction DisturbanceSSWS 1660 SWFL 0.01 Acres Operation DisturbanceSSWS 1670 CaliforniaCondor_Foraging 60.94 Acres Construction DisturbanceSSWS 1670 CaliforniaCondor_Foraging 17.23 Acres Operation DisturbanceSSWS 1670 CaliforniaCondor_Nesting 1.07 Acres Construction DisturbanceSSWS 1670 CaliforniaCondor_Nesting 0.34 Acres Operation DisturbanceSSWS 1670 SWFL 1.42 Acres Construction DisturbanceSSWS 1670 SWFL 0.40 Acres Operation DisturbanceSSWS 1670 WYBC 1.17 Acres Construction DisturbanceSSWS 1670 WYBC 0.32 Acres Operation DisturbanceSSWS 1670 YumaClapperRail 0.28 Acres Construction DisturbanceSSWS 1670 YumaClapperRail 0.12 Acres Operation DisturbanceSSWS 1680 CaliforniaCondor_Foraging 75.29 Acres Construction DisturbanceSSWS 1680 CaliforniaCondor_Foraging 20.48 Acres Operation DisturbanceSSWS 1680 CaliforniaCondor_Nesting 0.31 Acres Construction DisturbanceSSWS 1680 CaliforniaCondor_Nesting 0.17 Acres Operation DisturbanceSSWS 1690 CaliforniaCondor_Foraging 98.21 Acres Construction DisturbanceSSWS 1690 CaliforniaCondor_Foraging 26.57 Acres Operation DisturbanceSSWS 1690 CaliforniaCondor_Nesting 1.57 Acres Construction DisturbanceSSWS 1690 CaliforniaCondor_Nesting 0.37 Acres Operation DisturbanceSSWS 1700 CaliforniaCondor_Foraging 33.15 Acres Construction DisturbanceSSWS 1700 CaliforniaCondor_Foraging 5.13 Acres Operation DisturbanceSSWS 1710 CaliforniaCondor_Foraging 130.33 Acres Construction DisturbanceSSWS 1710 CaliforniaCondor_Foraging 38.12 Acres Operation Disturbance

Page 290: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

SSWS 1710 CaliforniaCondor_Nesting 1.08 Acres Construction DisturbanceSSWS 1710 CaliforniaCondor_Nesting 0.57 Acres Operation DisturbanceSSWS 1710 SWFL 5.08 Acres Construction DisturbanceSSWS 1710 SWFL 2.23 Acres Operation DisturbanceSSWS 1710 WYBC 3.74 Acres Construction DisturbanceSSWS 1710 WYBC 1.95 Acres Operation DisturbanceSSWS 1710 YumaClapperRail 2.79 Acres Construction DisturbanceSSWS 1710 YumaClapperRail 1.47 Acres Operation DisturbanceSSWS 1730 CaliforniaCondor_Foraging 165.18 Acres Construction DisturbanceSSWS 1730 CaliforniaCondor_Foraging 58.04 Acres Operation DisturbanceSSWS 1730 CaliforniaCondor_Nesting 7.25 Acres Construction DisturbanceSSWS 1730 CaliforniaCondor_Nesting 3.21 Acres Operation DisturbanceSSWS 1740 CaliforniaCondor_Foraging 78.47 Acres Construction DisturbanceSSWS 1740 CaliforniaCondor_Foraging 28.83 Acres Operation DisturbanceSSWS 1740 CaliforniaCondor_Nesting 0.42 Acres Construction DisturbanceSSWS 1740 CaliforniaCondor_Nesting 0.28 Acres Operation DisturbanceSSWS 1750 CaliforniaCondor_Foraging 5.13 Acres Construction DisturbanceSSWS 1750 CaliforniaCondor_Foraging 1.02 Acres Operation DisturbanceSSWS 1750 CaliforniaCondor_Nesting 0.36 Acres Construction DisturbanceSSWS 1750 CaliforniaCondor_Nesting 0.07 Acres Operation DisturbanceSSWS 1760 CaliforniaCondor_Foraging 125.88 Acres Construction DisturbanceSSWS 1760 CaliforniaCondor_Foraging 27.95 Acres Operation DisturbanceSSWS 1760 CaliforniaCondor_Nesting 0.18 Acres Construction DisturbanceSSWS 1760 CaliforniaCondor_Nesting 0.05 Acres Operation DisturbanceSSWS 1771 CaliforniaCondor_Foraging 295.46 Acres Construction DisturbanceSSWS 1771 CaliforniaCondor_Foraging 47.20 Acres Operation DisturbanceSSWS 1771 CaliforniaCondor_Nesting 0.02 Acres Construction DisturbanceSSWS 1771 CaliforniaCondor_Nesting 0.01 Acres Operation DisturbanceSSWS 1771 SWFL 0.09 Acres Construction DisturbanceSSWS 1771 SWFL 0.01 Acres Operation DisturbanceSSWS 1772 CaliforniaCondor_Foraging 3.91 Acres Construction DisturbanceSSWS 1772 CaliforniaCondor_Foraging 0.46 Acres Operation DisturbanceSSWS 1780 CaliforniaCondor_Foraging 68.59 Acres Construction DisturbanceSSWS 1780 CaliforniaCondor_Foraging 16.64 Acres Operation DisturbanceSSWS 1780 CaliforniaCondor_Nesting 0.32 Acres Construction DisturbanceSSWS 1780 CaliforniaCondor_Nesting 0.14 Acres Operation DisturbanceSSWS 1790 CaliforniaCondor_Foraging 179.51 Acres Construction DisturbanceSSWS 1790 CaliforniaCondor_Foraging 31.66 Acres Operation DisturbanceSSWS 1790 CaliforniaCondor_Nesting 6.42 Acres Construction DisturbanceSSWS 1790 CaliforniaCondor_Nesting 2.35 Acres Operation DisturbanceSSWS 1800 CaliforniaCondor_Foraging 15.89 Acres Construction DisturbanceSSWS 1800 CaliforniaCondor_Foraging 1.55 Acres Operation DisturbanceSSWS 1810 CaliforniaCondor_Foraging 107.97 Acres Construction DisturbanceSSWS 1810 CaliforniaCondor_Foraging 19.36 Acres Operation DisturbanceSSWS 1810 CaliforniaCondor_Nesting 0.79 Acres Construction Disturbance

Page 291: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

SSWS 1810 CaliforniaCondor_Nesting 0.16 Acres Operation DisturbanceSSWS 1820 CaliforniaCondor_Foraging 81.46 Acres Construction DisturbanceSSWS 1820 CaliforniaCondor_Foraging 11.68 Acres Operation DisturbanceSSWS 1830 CaliforniaCondor_Foraging 10.78 Acres Construction DisturbanceSSWS 1830 CaliforniaCondor_Foraging 0.77 Acres Operation DisturbanceSTRUCTURES-<200FT 1120 Commercial/Industrial 1.00 Each CountSTRUCTURES-<200FT 1190 Commercial/Industrial 1.00 Each CountSTRUCTURES-<200FT 1215.05 Commercial/Industrial 1.00 Each CountSTRUCTURES-<200FT 1219.2 Parks/Recreation 4.00 Each CountSTRUCTURES-<200FT 1219.2 Residential 2.00 Each CountSTRUCTURES-<200FT 1220 Commercial/Industrial 4.00 Each CountSTRUCTURES-<200FT 1310 Residential 1.00 Each CountSTRUCTURES-<200FT 1320.05 Outbuilding 1.00 Each CountSTRUCTURES-<200FT 1321 Residential 1.00 Each CountSTRUCTURES-<200FT 1322.5 Residential 1.00 Each CountSTRUCTURES-<200FT 1325.1 Parks/Recreation 1.00 Each CountSTRUCTURES-<200FT 1325.1 Residential 2.00 Each CountSTRUCTURES-<200FT 1330.1 Outbuilding 1.00 Each CountSTRUCTURES-<200FT 1520 Commercial/Industrial 1.00 Each CountSTRUCTURES-<200FT 1660 Commercial/Industrial 1.00 Each CountSTRUCTURES-<200FT 1680 Commercial/Industrial 1.00 Each CountSTRUCTURES-<500FT 1110 Commercial/Industrial 2.00 Each CountSTRUCTURES-<500FT 1115 Commercial/Industrial 1.00 Each CountSTRUCTURES-<500FT 1120 Commercial/Industrial 7.00 Each CountSTRUCTURES-<500FT 1190 Commercial/Industrial 3.00 Each CountSTRUCTURES-<500FT 1190 Commercial/Industrial 12.00 Each CountSTRUCTURES-<500FT 1190 Residential 5.00 Each CountSTRUCTURES-<500FT 1212 Commercial/Industrial 4.00 Each CountSTRUCTURES-<500FT 1215.05 Commercial/Industrial 3.00 Each CountSTRUCTURES-<500FT 1217.052 Residential 2.00 Each CountSTRUCTURES-<500FT 1217.1 Parks/Recreation 1.00 Each CountSTRUCTURES-<500FT 1217.1 Residential 2.00 Each CountSTRUCTURES-<500FT 1217.15 Residential 1.00 Each CountSTRUCTURES-<500FT 1218 Parks/Recreation 1.00 Each CountSTRUCTURES-<500FT 1218 Residential 1.00 Each CountSTRUCTURES-<500FT 1219.2 Residential 10.00 Each CountSTRUCTURES-<500FT 1219.6 Parks/Recreation 1.00 Each CountSTRUCTURES-<500FT 1220 Commercial/Industrial 1.00 Each CountSTRUCTURES-<500FT 1220 Commercial/Industrial 6.00 Each CountSTRUCTURES-<500FT 1310 Commercial/Industrial 1.00 Each CountSTRUCTURES-<500FT 1310 Outbuilding 2.00 Each CountSTRUCTURES-<500FT 1310 Residential 1.00 Each CountSTRUCTURES-<500FT 1320.05 Outbuilding 4.00 Each CountSTRUCTURES-<500FT 1320.05 Residential 2.00 Each CountSTRUCTURES-<500FT 1320.05 Residential 9.00 Each Count

Page 292: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

STRUCTURES-<500FT 1320.15 Residential 1.00 Each CountSTRUCTURES-<500FT 1321 Residential 2.00 Each CountSTRUCTURES-<500FT 1322.5 Residential 1.00 Each CountSTRUCTURES-<500FT 1323 Outbuilding 1.00 Each CountSTRUCTURES-<500FT 1323 Residential 1.00 Each CountSTRUCTURES-<500FT 1325.1 Parks/Recreation 3.00 Each CountSTRUCTURES-<500FT 1325.1 Residential 10.00 Each CountSTRUCTURES-<500FT 1325.2 Residential 1.00 Each CountSTRUCTURES-<500FT 1330.1 Agricultural 1.00 Each CountSTRUCTURES-<500FT 1330.1 Outbuilding 2.00 Each CountSTRUCTURES-<500FT 1330.1 Residential 2.00 Each CountSTRUCTURES-<500FT 1370 Residential 2.00 Each CountSTRUCTURES-<500FT 1400 Commercial/Industrial 1.00 Each CountSTRUCTURES-<500FT 1410 Agricultural 1.00 Each CountSTRUCTURES-<500FT 1520 Residential 1.00 Each CountSTRUCTURES-<500FT 1545 Residential 1.00 Each CountSTRUCTURES-<500FT 1660 Residential 5.00 Each CountSTRUCTURES-<500FT 1710 Residential 8.00 Each CountSTRUCTURES-<500FT 1730 Commercial/Industrial 1.00 Each CountSTRUCTURES-<500FT 1810 Commercial/Industrial 1.00 Each CountSTRUCTURES-<500FT 1820 Commercial/Industrial 1.00 Each CountTRAILS-CROSSINGS 1030 Rawlins to Baggs Stage Road 1.00 Each CountTRAILS-CROSSINGS 1051.15 Old Spanish Trail 1.00 Each CountTRAILS-CROSSINGS 1115 Cherokee Trail 2.00 Each CountTRAILS-CROSSINGS 1115 Overland Trail 1.00 Each CountTRAILS-CROSSINGS 1116 Cherokee Trail 1.00 Each CountTRAILS-CROSSINGS 1120 Overland Trail 1.00 Each CountTRAILS-CROSSINGS 1180 Cherokee Trail 1.00 Each CountTRAILS-CROSSINGS 1190 Cherokee Trail 1.00 Each CountTRAILS-CROSSINGS 1190 Overland Trail 1.00 Each CountTRAILS-CROSSINGS 1190 Rawlins to Baggs Stage Road 1.00 Each CountTRAILS-CROSSINGS 1220 Old Spanish Trail 3.00 Each CountTRAILS-CROSSINGS 1225.2 Old Spanish Trail 1.00 Each CountTRAILS-CROSSINGS 1330.1 Old Spanish Trail 8.00 Each CountTRAILS-CROSSINGS 1503 Old Spanish Trail 1.00 Each CountTRAILS-CROSSINGS 1504 Old Spanish Trail 1.00 Each CountTRAILS-CROSSINGS 1550.1 Old Spanish Trail 1.00 Each CountTRAILS-VIEWSHED 1030 Lincoln Highway 0.48 Miles Amount CrossedTRAILS-VIEWSHED 1030 Lincoln Highway 45.15 Miles Amount CrossedTRAILS-VIEWSHED 1030 Lincoln Highway 13.83 Miles Amount CrossedTRAILS-VIEWSHED 1030 Lincoln Highway 0.11 Miles Amount CrossedTRAILS-VIEWSHED 1030 Lincoln Highway 1.43 Miles Amount CrossedTRAILS-VIEWSHED 1030 Lincoln Highway 0.11 Miles Amount CrossedTRAILS-VIEWSHED 1030 Lincoln Highway-Contributing 2.17 Miles Amount CrossedTRAILS-VIEWSHED 1030 Lincoln Highway-Contributing 0.07 Miles Amount Crossed

Page 293: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

TRAILS-VIEWSHED 1030 Rawlins to Baggs Stage Road 4.31 Miles Amount CrossedTRAILS-VIEWSHED 1030 Rawlins to Baggs Stage Road-Contributing 0.86 Miles Amount CrossedTRAILS-VIEWSHED 1040 Lincoln Highway 0.04 Miles Amount CrossedTRAILS-VIEWSHED 1040 Lincoln Highway 0.05 Miles Amount CrossedTRAILS-VIEWSHED 1040 Lincoln Highway 0.08 Miles Amount CrossedTRAILS-VIEWSHED 1040 Lincoln Highway 0.12 Miles Amount CrossedTRAILS-VIEWSHED 1040 Lincoln Highway 0.25 Miles Amount CrossedTRAILS-VIEWSHED 1040 Lincoln Highway-Contributing 1.37 Miles Amount CrossedTRAILS-VIEWSHED 1040 Lincoln Highway-Contributing 0.16 Miles Amount CrossedTRAILS-VIEWSHED 1050 Cherokee Trail 4.00 Miles Amount CrossedTRAILS-VIEWSHED 1050 Cherokee Trail-Contributing 3.62 Miles Amount CrossedTRAILS-VIEWSHED 1050 Lincoln Highway 0.08 Miles Amount CrossedTRAILS-VIEWSHED 1050 Lincoln Highway 2.90 Miles Amount CrossedTRAILS-VIEWSHED 1050 Lincoln Highway 1.07 Miles Amount CrossedTRAILS-VIEWSHED 1050 Lincoln Highway 0.66 Miles Amount CrossedTRAILS-VIEWSHED 1050 Lincoln Highway-Contributing 0.73 Miles Amount CrossedTRAILS-VIEWSHED 1050 Overland Trail 5.42 Miles Amount CrossedTRAILS-VIEWSHED 1050 Overland Trail-Contributing 4.28 Miles Amount CrossedTRAILS-VIEWSHED 1110 Lincoln Highway 0.08 Miles Amount CrossedTRAILS-VIEWSHED 1110 Lincoln Highway 0.59 Miles Amount CrossedTRAILS-VIEWSHED 1115 Cherokee Trail 14.05 Miles Amount CrossedTRAILS-VIEWSHED 1115 Cherokee Trail-Contributing 7.70 Miles Amount CrossedTRAILS-VIEWSHED 1115 Overland Trail 4.01 Miles Amount CrossedTRAILS-VIEWSHED 1115 Overland Trail-Contributing 4.26 Miles Amount CrossedTRAILS-VIEWSHED 1115 Rawlins to Baggs Stage Road 0.50 Miles Amount CrossedTRAILS-VIEWSHED 1115 Rawlins to Baggs Stage Road 2.76 Miles Amount CrossedTRAILS-VIEWSHED 1115 Rawlins to Baggs Stage Road-Contributing 0.41 Miles Amount CrossedTRAILS-VIEWSHED 1116 Cherokee Trail 7.53 Miles Amount CrossedTRAILS-VIEWSHED 1116 Cherokee Trail-Contributing 4.94 Miles Amount CrossedTRAILS-VIEWSHED 1120 Cherokee Trail 9.55 Miles Amount CrossedTRAILS-VIEWSHED 1120 Cherokee Trail-Contributing 7.64 Miles Amount CrossedTRAILS-VIEWSHED 1120 Overland Trail 5.26 Miles Amount CrossedTRAILS-VIEWSHED 1120 Overland Trail-Contributing 4.02 Miles Amount CrossedTRAILS-VIEWSHED 1120.1 Cherokee Trail 7.33 Miles Amount CrossedTRAILS-VIEWSHED 1120.1 Cherokee Trail-Contributing 4.64 Miles Amount CrossedTRAILS-VIEWSHED 1120.2 Cherokee Trail 4.57 Miles Amount CrossedTRAILS-VIEWSHED 1120.2 Cherokee Trail-Contributing 4.38 Miles Amount CrossedTRAILS-VIEWSHED 1180 Cherokee Trail 2.93 Miles Amount CrossedTRAILS-VIEWSHED 1180 Cherokee Trail-Contributing 2.92 Miles Amount CrossedTRAILS-VIEWSHED 1187 Cherokee Trail 2.78 Miles Amount CrossedTRAILS-VIEWSHED 1187 Cherokee Trail-Contributing 1.50 Miles Amount CrossedTRAILS-VIEWSHED 1190 Cherokee Trail 5.91 Miles Amount CrossedTRAILS-VIEWSHED 1190 Cherokee Trail-Contributing 4.22 Miles Amount CrossedTRAILS-VIEWSHED 1190 Lincoln Highway 0.04 Miles Amount CrossedTRAILS-VIEWSHED 1190 Lincoln Highway 0.04 Miles Amount Crossed

Page 294: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

TRAILS-VIEWSHED 1190 Lincoln Highway 0.08 Miles Amount CrossedTRAILS-VIEWSHED 1190 Lincoln Highway 0.17 Miles Amount CrossedTRAILS-VIEWSHED 1190 Lincoln Highway-Contributing 0.97 Miles Amount CrossedTRAILS-VIEWSHED 1190 Lincoln Highway-Contributing 0.10 Miles Amount CrossedTRAILS-VIEWSHED 1190 Overland Trail 1.56 Miles Amount CrossedTRAILS-VIEWSHED 1190 Overland Trail-Contributing 5.53 Miles Amount CrossedTRAILS-VIEWSHED 1190 Rawlins to Baggs Stage Road 3.05 Miles Amount CrossedTRAILS-VIEWSHED 1190 Rawlins to Baggs Stage Road 16.17 Miles Amount CrossedTRAILS-VIEWSHED 1190 Rawlins to Baggs Stage Road-Contributing 4.75 Miles Amount CrossedTRAILS-VIEWSHED 1220 Old Spanish Trail-NHT II 0.64 Miles Amount CrossedTRAILS-VIEWSHED 1220 Old Spanish Trail-NHT II 6.47 Miles Amount CrossedTRAILS-VIEWSHED 1220 Old Spanish Trail-NHT II 0.03 Miles Amount CrossedTRAILS-VIEWSHED 1220 Old Spanish Trail-NHT II 0.18 Miles Amount CrossedTRAILS-VIEWSHED 1220 Old Spanish Trail-NHT III 0.42 Miles Amount CrossedTRAILS-VIEWSHED 1220 Old Spanish Trail-NHT III 2.69 Miles Amount CrossedTRAILS-VIEWSHED 1220 Old Spanish Trail-NHT III 3.17 Miles Amount CrossedTRAILS-VIEWSHED 1220 Old Spanish Trail-NHT IV 24.36 Miles Amount CrossedTRAILS-VIEWSHED 1220 Old Spanish Trail-NHT IV 1.09 Miles Amount CrossedTRAILS-VIEWSHED 1220 Old Spanish Trail-NHT IV 1.69 Miles Amount CrossedTRAILS-VIEWSHED 1220 Old Spanish Trail-NHT V 0.27 Miles Amount CrossedTRAILS-VIEWSHED 1220 Old Spanish Trail-NHT V 5.14 Miles Amount CrossedTRAILS-VIEWSHED 1220 Old Spanish Trail-NHT V 6.61 Miles Amount CrossedTRAILS-VIEWSHED 1220 Old Spanish Trail-NHT V 6.21 Miles Amount CrossedTRAILS-VIEWSHED 1225.2 Old Spanish Trail-NHT II 8.93 Miles Amount CrossedTRAILS-VIEWSHED 1225.2 Old Spanish Trail-NHT III 0.90 Miles Amount CrossedTRAILS-VIEWSHED 1225.2 Old Spanish Trail-NHT IV 3.79 Miles Amount CrossedTRAILS-VIEWSHED 1225.2 Old Spanish Trail-NHT V 4.22 Miles Amount CrossedTRAILS-VIEWSHED 1330.1 Old Spanish Trail 24.65 Miles Amount CrossedTRAILS-VIEWSHED 1330.1 Old Spanish Trail-NHT II 1.52 Miles Amount CrossedTRAILS-VIEWSHED 1330.1 Old Spanish Trail-NHT III 0.46 Miles Amount CrossedTRAILS-VIEWSHED 1330.1 Old Spanish Trail-NHT IV 0.46 Miles Amount CrossedTRAILS-VIEWSHED 1330.1 Old Spanish Trail-NHT V 6.44 Miles Amount CrossedTRAILS-VIEWSHED 1500.05 Old Spanish Trail 1.64 Miles Amount CrossedTRAILS-VIEWSHED 1501.1 Old Spanish Trail 12.83 Miles Amount CrossedTRAILS-VIEWSHED 1501.15 Old Spanish Trail 2.75 Miles Amount CrossedTRAILS-VIEWSHED 1502.5 Old Spanish Trail 0.39 Miles Amount CrossedTRAILS-VIEWSHED 1503 Old Spanish Trail 3.56 Miles Amount CrossedTRAILS-VIEWSHED 1503.5 Old Spanish Trail 2.56 Miles Amount CrossedTRAILS-VIEWSHED 1504 Old Spanish Trail 3.54 Miles Amount CrossedTRAILS-VIEWSHED 1505 Old Spanish Trail 2.65 Miles Amount CrossedTRAILS-VIEWSHED 1506 Old Spanish Trail 3.10 Miles Amount CrossedTRAILS-VIEWSHED 1540.1 Old Spanish Trail-NHT I 0.27 Miles Amount CrossedTRAILS-VIEWSHED 1540.1 Old Spanish Trail-NHT I 4.46 Miles Amount CrossedTRAILS-VIEWSHED 1540.1 Old Spanish Trail-NHT II 0.20 Miles Amount CrossedTRAILS-VIEWSHED 1540.2 Old Spanish Trail-NHT II 1.11 Miles Amount Crossed

Page 295: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

TRAILS-VIEWSHED 1550.1 Old Spanish Trail-NHT I 1.80 Miles Amount CrossedTRAILS-VIEWSHED 1550.1 Old Spanish Trail-NHT I 5.84 Miles Amount CrossedTRAILS-VIEWSHED 1550.1 Old Spanish Trail-NHT II 0.53 Miles Amount CrossedTRAILS-VIEWSHED 1550.1 Old Spanish Trail-NHT II 0.27 Miles Amount CrossedTRAILS-VIEWSHED 1550.1 Old Spanish Trail-NHT IV 0.08 Miles Amount CrossedTRAILS-VIEWSHED 1560 Old Spanish Trail-NHT II 1.11 Miles Amount CrossedTRAILS-VIEWSHED 1570 Old Spanish Trail-NHT II 1.11 Miles Amount CrossedTRAILS-VIEWSHED 1580 Old Spanish Trail-NHT II 0.10 Miles Amount CrossedTRAILS-VIEWSHED 1590 Old Spanish Trail-NHT II 1.11 Miles Amount CrossedUSFS SIO VQO Class Impacts 1217.052 Modification VQO 1.90 Miles Amount CrossedUSFS SIO VQO Class Impacts 1217.052 Partial Retention VQO 6.09 Miles Amount CrossedUSFS SIO VQO Class Impacts 1217.15 Partial Retention VQO 8.05 Miles Amount CrossedUSFS SIO VQO Class Impacts 1217.15 Retention VQO 0.05 Miles Amount CrossedUSFS SIO VQO Class Impacts 1219.2 Modification VQO 1.20 Miles Amount CrossedUSFS SIO VQO Class Impacts 1219.2 Partial Retention VQO 0.89 Miles Amount CrossedUSFS SIO VQO Class Impacts 1219.2 Retention VQO 0.39 Miles Amount CrossedUSFS SIO VQO Class Impacts 1310 Modification VQO 3.60 Miles Amount CrossedUSFS SIO VQO Class Impacts 1310 Partial Retention VQO 11.15 Miles Amount CrossedUSFS SIO VQO Class Impacts 1320.15 Modification VQO 0.29 Miles Amount CrossedUSFS SIO VQO Class Impacts 1320.15 Partial Retention VQO 0.91 Miles Amount CrossedUSFS SIO VQO Class Impacts 1320.15 Retention VQO 0.30 Miles Amount CrossedUSFS SIO VQO Class Impacts 1323 Modification VQO 0.63 Miles Amount CrossedUSFS SIO VQO Class Impacts 1323 Partial Retention VQO 4.00 Miles Amount CrossedUSFS SIO VQO Class Impacts 1324 Modification VQO 0.80 Miles Amount CrossedUSFS SIO VQO Class Impacts 1324 Partial Retention VQO 3.85 Miles Amount CrossedUSFS SIO VQO Class Impacts 1324.2 Modification VQO 0.71 Miles Amount CrossedUSFS SIO VQO Class Impacts 1324.2 Partial Retention VQO 3.99 Miles Amount CrossedUSFS SIO VQO Class Impacts 1324.4 Modification VQO 0.71 Miles Amount CrossedUSFS SIO VQO Class Impacts 1324.4 Partial Retention VQO 4.04 Miles Amount CrossedUSFS SIO VQO Class Impacts 1325 Modification VQO 2.62 Miles Amount CrossedUSFS SIO VQO Class Impacts 1325 Partial Retention VQO 5.77 Miles Amount CrossedUSFS SIO VQO Class Impacts 1325.1 Modification VQO 11.98 Miles Amount CrossedUSFS SIO VQO Class Impacts 1330.1 High SIO 6.82 Miles Amount CrossedUSFS SIO VQO Class Impacts 1330.1 Moderate SIO 19.62 Miles Amount CrossedUSFS SIO VQO Class Impacts 1380 Moderate SIO 2.23 Miles Amount CrossedUSFS SIO VQO Class Impacts 1410 Moderate SIO 7.45 Miles Amount CrossedUSFS SIO VQO Class Impacts 1500.05 High SIO 0.89 Miles Amount CrossedUSFS SIO VQO Class Impacts 1500.05 Moderate SIO 1.78 Miles Amount CrossedUSFS SIO VQO Class Impacts 1501.1 High SIO 4.13 Miles Amount CrossedUSFS SIO VQO Class Impacts 1501.1 Moderate SIO 9.60 Miles Amount CrossedUSFS SIO VQO Class Impacts 1501.15 Moderate SIO 1.04 Miles Amount CrossedUSFS SIO VQO Class Impacts 1502.5 Moderate SIO 2.40 Miles Amount CrossedUSFS SIO VQO Class Impacts 1503 High SIO 6.54 Miles Amount CrossedUSFS SIO VQO Class Impacts 1503 Moderate SIO 0.06 Miles Amount CrossedUSFS SIO VQO Class Impacts 1503.5 Moderate SIO 0.65 Miles Amount Crossed

Page 296: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

USFS SIO VQO Class Impacts 1504 High SIO 6.18 Miles Amount CrossedUSFS SIO VQO Class Impacts 1504 Moderate SIO 0.06 Miles Amount CrossedUSFS SIO VQO Class Impacts 1505 High SIO 8.46 Miles Amount CrossedUSFS SIO VQO Class Impacts 1505 Moderate SIO 0.61 Miles Amount CrossedUSFS SIO VQO Class Impacts 1506 High SIO 19.09 Miles Amount CrossedUSFS SIO VQO Class Impacts 1506 Moderate SIO 0.69 Miles Amount CrossedVEG 1030 Agriculture 0.20 Acres Construction DisturbanceVEG 1030 Agriculture 0.05 Acres Operation DisturbanceVEG 1030 Barren/Sparsely Vegetated 0.13 Acres Construction DisturbanceVEG 1030 Barren/Sparsely Vegetated 0.03 Acres Operation DisturbanceVEG 1030 Cliff and Canyon 2.30 Acres Construction DisturbanceVEG 1030 Cliff and Canyon 0.41 Acres Operation DisturbanceVEG 1030 Conifer Forest 0.14 Acres Construction DisturbanceVEG 1030 Conifer Forest 0.02 Acres Operation DisturbanceVEG 1030 Developed/Disturbed 9.10 Acres Construction DisturbanceVEG 1030 Developed/Disturbed 2.16 Acres Operation DisturbanceVEG 1030 Dunes 0.22 Acres Construction DisturbanceVEG 1030 Dunes 0.05 Acres Operation DisturbanceVEG 1030 Grassland 2.43 Acres Construction DisturbanceVEG 1030 Grassland 0.68 Acres Operation DisturbanceVEG 1030 Greasewood Flat 6.22 Acres Construction DisturbanceVEG 1030 Greasewood Flat 1.22 Acres Operation DisturbanceVEG 1030 Herbaceous Wetland 5.50 Acres Construction DisturbanceVEG 1030 Herbaceous Wetland 1.01 Acres Operation DisturbanceVEG 1030 Montane Shrubland 0.00 Acres Construction DisturbanceVEG 1030 Montane Shrubland 0.00 Acres Operation DisturbanceVEG 1030 Open Water 0.03 Acres Construction DisturbanceVEG 1030 Open Water 0.01 Acres Operation DisturbanceVEG 1030 Sagebrush Shrubland 338.47 Acres Construction DisturbanceVEG 1030 Sagebrush Shrubland 64.95 Acres Operation DisturbanceVEG 1030 Saltbush Shrubland 35.80 Acres Construction DisturbanceVEG 1030 Saltbush Shrubland 6.70 Acres Operation DisturbanceVEG 1030 Woody Riparian and Wetlands 5.77 Acres Construction DisturbanceVEG 1030 Woody Riparian and Wetlands 1.06 Acres Operation DisturbanceVEG 1040 Deciduous Forest 0.19 Acres Construction DisturbanceVEG 1040 Deciduous Forest 0.04 Acres Operation DisturbanceVEG 1040 Developed/Disturbed 1.80 Acres Construction DisturbanceVEG 1040 Developed/Disturbed 0.35 Acres Operation DisturbanceVEG 1040 Dunes 0.25 Acres Construction DisturbanceVEG 1040 Dunes 0.05 Acres Operation DisturbanceVEG 1040 Greasewood Flat 0.10 Acres Construction DisturbanceVEG 1040 Greasewood Flat 0.02 Acres Operation DisturbanceVEG 1040 Herbaceous Wetland 0.65 Acres Construction DisturbanceVEG 1040 Herbaceous Wetland 0.12 Acres Operation DisturbanceVEG 1040 Sagebrush Shrubland 76.91 Acres Construction Disturbance

Page 297: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

VEG 1040 Sagebrush Shrubland 14.53 Acres Operation DisturbanceVEG 1040 Saltbush Shrubland 36.96 Acres Construction DisturbanceVEG 1040 Saltbush Shrubland 7.09 Acres Operation DisturbanceVEG 1040 Woody Riparian and Wetlands 0.23 Acres Construction DisturbanceVEG 1040 Woody Riparian and Wetlands 0.05 Acres Operation DisturbanceVEG 1100 Agriculture 5.36 Acres Construction DisturbanceVEG 1100 Agriculture 1.05 Acres Operation DisturbanceVEG 1100 Barren/Sparsely Vegetated 0.21 Acres Construction DisturbanceVEG 1100 Barren/Sparsely Vegetated 0.10 Acres Operation DisturbanceVEG 1100 Cliff and Canyon 1.43 Acres Construction DisturbanceVEG 1100 Cliff and Canyon 0.22 Acres Operation DisturbanceVEG 1100 Developed/Disturbed 7.13 Acres Construction DisturbanceVEG 1100 Developed/Disturbed 2.10 Acres Operation DisturbanceVEG 1100 Grassland 21.64 Acres Construction DisturbanceVEG 1100 Grassland 4.32 Acres Operation DisturbanceVEG 1100 Greasewood Flat 1.88 Acres Construction DisturbanceVEG 1100 Greasewood Flat 0.45 Acres Operation DisturbanceVEG 1100 Montane Shrubland 0.00 Acres Construction DisturbanceVEG 1100 Montane Shrubland 0.00 Acres Operation DisturbanceVEG 1100 Pinyon-Juniper 16.03 Acres Construction DisturbanceVEG 1100 Pinyon-Juniper 3.92 Acres Operation DisturbanceVEG 1100 Sagebrush Shrubland 83.68 Acres Construction DisturbanceVEG 1100 Sagebrush Shrubland 18.85 Acres Operation DisturbanceVEG 1100 Saltbush Shrubland 46.13 Acres Construction DisturbanceVEG 1100 Saltbush Shrubland 9.81 Acres Operation DisturbanceVEG 1101 Agriculture 0.14 Acres Construction DisturbanceVEG 1101 Agriculture 0.02 Acres Operation DisturbanceVEG 1101 Developed/Disturbed 0.86 Acres Construction DisturbanceVEG 1101 Developed/Disturbed 0.13 Acres Operation DisturbanceVEG 1101 Grassland 2.75 Acres Construction DisturbanceVEG 1101 Grassland 0.38 Acres Operation DisturbanceVEG 1101 Pinyon-Juniper 0.61 Acres Construction DisturbanceVEG 1101 Pinyon-Juniper 0.09 Acres Operation DisturbanceVEG 1101 Sagebrush Shrubland 11.77 Acres Construction DisturbanceVEG 1101 Sagebrush Shrubland 1.76 Acres Operation DisturbanceVEG 1103 Agriculture 2.82 Acres Construction DisturbanceVEG 1103 Agriculture 0.45 Acres Operation DisturbanceVEG 1103 Developed/Disturbed 5.99 Acres Construction DisturbanceVEG 1103 Developed/Disturbed 0.88 Acres Operation DisturbanceVEG 1103 Grassland 0.31 Acres Construction DisturbanceVEG 1103 Grassland 0.07 Acres Operation DisturbanceVEG 1103 Greasewood Flat 0.04 Acres Construction DisturbanceVEG 1103 Greasewood Flat 0.01 Acres Operation DisturbanceVEG 1103 Pinyon-Juniper 0.71 Acres Construction DisturbanceVEG 1103 Pinyon-Juniper 0.15 Acres Operation Disturbance

Page 298: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

VEG 1103 Sagebrush Shrubland 39.08 Acres Construction DisturbanceVEG 1103 Sagebrush Shrubland 6.31 Acres Operation DisturbanceVEG 1104 Agriculture 0.64 Acres Construction DisturbanceVEG 1104 Agriculture 0.14 Acres Operation DisturbanceVEG 1104 Developed/Disturbed 6.11 Acres Construction DisturbanceVEG 1104 Developed/Disturbed 1.48 Acres Operation DisturbanceVEG 1104 Grassland 3.31 Acres Construction DisturbanceVEG 1104 Grassland 0.69 Acres Operation DisturbanceVEG 1104 Greasewood Flat 1.10 Acres Construction DisturbanceVEG 1104 Greasewood Flat 0.25 Acres Operation DisturbanceVEG 1104 Pinyon-Juniper 18.23 Acres Construction DisturbanceVEG 1104 Pinyon-Juniper 4.35 Acres Operation DisturbanceVEG 1104 Sagebrush Shrubland 33.47 Acres Construction DisturbanceVEG 1104 Sagebrush Shrubland 7.88 Acres Operation DisturbanceVEG 1105 Agriculture 0.43 Acres Construction DisturbanceVEG 1105 Agriculture 0.08 Acres Operation DisturbanceVEG 1105 Developed/Disturbed 1.64 Acres Construction DisturbanceVEG 1105 Developed/Disturbed 0.32 Acres Operation DisturbanceVEG 1105 Grassland 1.54 Acres Construction DisturbanceVEG 1105 Grassland 0.29 Acres Operation DisturbanceVEG 1105 Greasewood Flat 1.02 Acres Construction DisturbanceVEG 1105 Greasewood Flat 0.21 Acres Operation DisturbanceVEG 1105 Pinyon-Juniper 31.39 Acres Construction DisturbanceVEG 1105 Pinyon-Juniper 6.40 Acres Operation DisturbanceVEG 1105 Sagebrush Shrubland 33.20 Acres Construction DisturbanceVEG 1105 Sagebrush Shrubland 6.74 Acres Operation DisturbanceVEG 1106 Agriculture 4.38 Acres Construction DisturbanceVEG 1106 Agriculture 1.58 Acres Operation DisturbanceVEG 1106 Developed/Disturbed 7.96 Acres Construction DisturbanceVEG 1106 Developed/Disturbed 1.31 Acres Operation DisturbanceVEG 1106 Grassland 9.86 Acres Construction DisturbanceVEG 1106 Grassland 3.88 Acres Operation DisturbanceVEG 1106 Greasewood Flat 0.13 Acres Construction DisturbanceVEG 1106 Greasewood Flat 0.01 Acres Operation DisturbanceVEG 1106 Pinyon-Juniper 6.17 Acres Construction DisturbanceVEG 1106 Pinyon-Juniper 1.54 Acres Operation DisturbanceVEG 1106 Sagebrush Shrubland 58.32 Acres Construction DisturbanceVEG 1106 Sagebrush Shrubland 12.69 Acres Operation DisturbanceVEG 1106 Saltbush Shrubland 0.01 Acres Construction DisturbanceVEG 1106 Saltbush Shrubland 0.00 Acres Operation DisturbanceVEG 1110 Barren/Sparsely Vegetated 0.00 Acres Construction DisturbanceVEG 1110 Barren/Sparsely Vegetated 0.00 Acres Operation DisturbanceVEG 1110 Cliff and Canyon 0.01 Acres Construction DisturbanceVEG 1110 Cliff and Canyon 0.00 Acres Operation DisturbanceVEG 1110 Developed/Disturbed 1.21 Acres Construction Disturbance

Page 299: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

VEG 1110 Developed/Disturbed 0.23 Acres Operation DisturbanceVEG 1110 Dunes 0.06 Acres Construction DisturbanceVEG 1110 Dunes 0.01 Acres Operation DisturbanceVEG 1110 Greasewood Flat 0.68 Acres Construction DisturbanceVEG 1110 Greasewood Flat 0.13 Acres Operation DisturbanceVEG 1110 Herbaceous Wetland 9.19 Acres Construction DisturbanceVEG 1110 Herbaceous Wetland 1.66 Acres Operation DisturbanceVEG 1110 Open Water 0.02 Acres Construction DisturbanceVEG 1110 Open Water 0.00 Acres Operation DisturbanceVEG 1110 Sagebrush Shrubland 12.47 Acres Construction DisturbanceVEG 1110 Sagebrush Shrubland 2.29 Acres Operation DisturbanceVEG 1110 Saltbush Shrubland 64.71 Acres Construction DisturbanceVEG 1110 Saltbush Shrubland 11.94 Acres Operation DisturbanceVEG 1110 Woody Riparian and Wetlands 3.41 Acres Construction DisturbanceVEG 1110 Woody Riparian and Wetlands 0.61 Acres Operation DisturbanceVEG 1115 Agriculture 0.06 Acres Construction DisturbanceVEG 1115 Agriculture 0.01 Acres Operation DisturbanceVEG 1115 Barren/Sparsely Vegetated 0.46 Acres Construction DisturbanceVEG 1115 Barren/Sparsely Vegetated 0.09 Acres Operation DisturbanceVEG 1115 Cliff and Canyon 0.30 Acres Construction DisturbanceVEG 1115 Cliff and Canyon 0.06 Acres Operation DisturbanceVEG 1115 Conifer Forest 0.12 Acres Construction DisturbanceVEG 1115 Conifer Forest 0.02 Acres Operation DisturbanceVEG 1115 Developed/Disturbed 17.63 Acres Construction DisturbanceVEG 1115 Developed/Disturbed 3.38 Acres Operation DisturbanceVEG 1115 Dunes 0.31 Acres Construction DisturbanceVEG 1115 Dunes 0.06 Acres Operation DisturbanceVEG 1115 Greasewood Flat 11.19 Acres Construction DisturbanceVEG 1115 Greasewood Flat 2.16 Acres Operation DisturbanceVEG 1115 Herbaceous Wetland 13.74 Acres Construction DisturbanceVEG 1115 Herbaceous Wetland 2.63 Acres Operation DisturbanceVEG 1115 Open Water 0.14 Acres Construction DisturbanceVEG 1115 Open Water 0.03 Acres Operation DisturbanceVEG 1115 Riparian 0.00 Acres Construction DisturbanceVEG 1115 Riparian 0.00 Acres Operation DisturbanceVEG 1115 Sagebrush Shrubland 296.69 Acres Construction DisturbanceVEG 1115 Sagebrush Shrubland 57.46 Acres Operation DisturbanceVEG 1115 Saltbush Shrubland 232.41 Acres Construction DisturbanceVEG 1115 Saltbush Shrubland 44.78 Acres Operation DisturbanceVEG 1115 Woody Riparian and Wetlands 3.13 Acres Construction DisturbanceVEG 1115 Woody Riparian and Wetlands 0.61 Acres Operation DisturbanceVEG 1116 Barren/Sparsely Vegetated 0.64 Acres Construction DisturbanceVEG 1116 Barren/Sparsely Vegetated 0.12 Acres Operation DisturbanceVEG 1116 Cliff and Canyon 1.19 Acres Construction DisturbanceVEG 1116 Cliff and Canyon 0.25 Acres Operation Disturbance

Page 300: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

VEG 1116 Conifer Forest 1.78 Acres Construction DisturbanceVEG 1116 Conifer Forest 0.47 Acres Operation DisturbanceVEG 1116 Developed/Disturbed 2.87 Acres Construction DisturbanceVEG 1116 Developed/Disturbed 0.53 Acres Operation DisturbanceVEG 1116 Dunes 0.03 Acres Construction DisturbanceVEG 1116 Dunes 0.01 Acres Operation DisturbanceVEG 1116 Grassland 0.00 Acres Construction DisturbanceVEG 1116 Grassland 0.00 Acres Operation DisturbanceVEG 1116 Greasewood Flat 1.52 Acres Construction DisturbanceVEG 1116 Greasewood Flat 0.30 Acres Operation DisturbanceVEG 1116 Sagebrush Shrubland 77.23 Acres Construction DisturbanceVEG 1116 Sagebrush Shrubland 14.83 Acres Operation DisturbanceVEG 1116 Saltbush Shrubland 18.12 Acres Construction DisturbanceVEG 1116 Saltbush Shrubland 3.57 Acres Operation DisturbanceVEG 1116 Woody Riparian and Wetlands 1.74 Acres Construction DisturbanceVEG 1116 Woody Riparian and Wetlands 0.32 Acres Operation DisturbanceVEG 1120 Barren/Sparsely Vegetated 4.45 Acres Construction DisturbanceVEG 1120 Barren/Sparsely Vegetated 0.94 Acres Operation DisturbanceVEG 1120 Cliff and Canyon 7.10 Acres Construction DisturbanceVEG 1120 Cliff and Canyon 1.51 Acres Operation DisturbanceVEG 1120 Conifer Forest 0.20 Acres Construction DisturbanceVEG 1120 Conifer Forest 0.04 Acres Operation DisturbanceVEG 1120 Developed/Disturbed 6.49 Acres Construction DisturbanceVEG 1120 Developed/Disturbed 1.40 Acres Operation DisturbanceVEG 1120 Dunes 13.80 Acres Construction DisturbanceVEG 1120 Dunes 3.01 Acres Operation DisturbanceVEG 1120 Grassland 0.26 Acres Construction DisturbanceVEG 1120 Grassland 0.05 Acres Operation DisturbanceVEG 1120 Greasewood Flat 4.97 Acres Construction DisturbanceVEG 1120 Greasewood Flat 1.14 Acres Operation DisturbanceVEG 1120 Herbaceous Wetland 5.02 Acres Construction DisturbanceVEG 1120 Herbaceous Wetland 1.04 Acres Operation DisturbanceVEG 1120 Sagebrush Shrubland 121.76 Acres Construction DisturbanceVEG 1120 Sagebrush Shrubland 25.94 Acres Operation DisturbanceVEG 1120 Saltbush Shrubland 260.30 Acres Construction DisturbanceVEG 1120 Saltbush Shrubland 55.71 Acres Operation DisturbanceVEG 1120 Woody Riparian and Wetlands 5.07 Acres Construction DisturbanceVEG 1120 Woody Riparian and Wetlands 1.06 Acres Operation DisturbanceVEG 1120.1 Barren/Sparsely Vegetated 0.39 Acres Construction DisturbanceVEG 1120.1 Barren/Sparsely Vegetated 0.15 Acres Operation DisturbanceVEG 1120.1 Cliff and Canyon 3.87 Acres Construction DisturbanceVEG 1120.1 Cliff and Canyon 1.04 Acres Operation DisturbanceVEG 1120.1 Conifer Forest 0.64 Acres Construction DisturbanceVEG 1120.1 Conifer Forest 0.19 Acres Operation DisturbanceVEG 1120.1 Developed/Disturbed 0.21 Acres Construction Disturbance

Page 301: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

VEG 1120.1 Developed/Disturbed 0.07 Acres Operation DisturbanceVEG 1120.1 Greasewood Flat 0.26 Acres Construction DisturbanceVEG 1120.1 Greasewood Flat 0.10 Acres Operation DisturbanceVEG 1120.1 Sagebrush Shrubland 16.65 Acres Construction DisturbanceVEG 1120.1 Sagebrush Shrubland 4.38 Acres Operation DisturbanceVEG 1120.1 Saltbush Shrubland 12.93 Acres Construction DisturbanceVEG 1120.1 Saltbush Shrubland 4.13 Acres Operation DisturbanceVEG 1120.1 Woody Riparian and Wetlands 0.02 Acres Construction DisturbanceVEG 1120.1 Woody Riparian and Wetlands 0.01 Acres Operation DisturbanceVEG 1120.2 Barren/Sparsely Vegetated 0.06 Acres Construction DisturbanceVEG 1120.2 Barren/Sparsely Vegetated 0.01 Acres Operation DisturbanceVEG 1120.2 Cliff and Canyon 1.06 Acres Construction DisturbanceVEG 1120.2 Cliff and Canyon 0.20 Acres Operation DisturbanceVEG 1120.2 Conifer Forest 0.17 Acres Construction DisturbanceVEG 1120.2 Conifer Forest 0.04 Acres Operation DisturbanceVEG 1120.2 Developed/Disturbed 0.26 Acres Construction DisturbanceVEG 1120.2 Developed/Disturbed 0.05 Acres Operation DisturbanceVEG 1120.2 Dunes 0.00 Acres Construction DisturbanceVEG 1120.2 Dunes 0.00 Acres Operation DisturbanceVEG 1120.2 Greasewood Flat 0.32 Acres Construction DisturbanceVEG 1120.2 Greasewood Flat 0.05 Acres Operation DisturbanceVEG 1120.2 Sagebrush Shrubland 17.64 Acres Construction DisturbanceVEG 1120.2 Sagebrush Shrubland 3.02 Acres Operation DisturbanceVEG 1120.2 Saltbush Shrubland 27.84 Acres Construction DisturbanceVEG 1120.2 Saltbush Shrubland 4.49 Acres Operation DisturbanceVEG 1120.2 Woody Riparian and Wetlands 0.08 Acres Construction DisturbanceVEG 1120.2 Woody Riparian and Wetlands 0.01 Acres Operation DisturbanceVEG 1180 Barren/Sparsely Vegetated 0.19 Acres Construction DisturbanceVEG 1180 Barren/Sparsely Vegetated 0.04 Acres Operation DisturbanceVEG 1180 Cliff and Canyon 1.34 Acres Construction DisturbanceVEG 1180 Cliff and Canyon 0.29 Acres Operation DisturbanceVEG 1180 Conifer Forest 0.49 Acres Construction DisturbanceVEG 1180 Conifer Forest 0.09 Acres Operation DisturbanceVEG 1180 Developed/Disturbed 1.14 Acres Construction DisturbanceVEG 1180 Developed/Disturbed 0.23 Acres Operation DisturbanceVEG 1180 Dunes 0.01 Acres Construction DisturbanceVEG 1180 Dunes 0.00 Acres Operation DisturbanceVEG 1180 Grassland 0.01 Acres Construction DisturbanceVEG 1180 Grassland 0.00 Acres Operation DisturbanceVEG 1180 Greasewood Flat 0.77 Acres Construction DisturbanceVEG 1180 Greasewood Flat 0.15 Acres Operation DisturbanceVEG 1180 Sagebrush Shrubland 40.00 Acres Construction DisturbanceVEG 1180 Sagebrush Shrubland 8.08 Acres Operation DisturbanceVEG 1180 Saltbush Shrubland 19.72 Acres Construction DisturbanceVEG 1180 Saltbush Shrubland 3.99 Acres Operation Disturbance

Page 302: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

VEG 1180 Woody Riparian and Wetlands 0.63 Acres Construction DisturbanceVEG 1180 Woody Riparian and Wetlands 0.12 Acres Operation DisturbanceVEG 1187 Agriculture 5.57 Acres Construction DisturbanceVEG 1187 Agriculture 1.70 Acres Operation DisturbanceVEG 1187 Barren/Sparsely Vegetated 3.60 Acres Construction DisturbanceVEG 1187 Barren/Sparsely Vegetated 1.10 Acres Operation DisturbanceVEG 1187 Cliff and Canyon 4.49 Acres Construction DisturbanceVEG 1187 Cliff and Canyon 1.11 Acres Operation DisturbanceVEG 1187 Conifer Forest 0.12 Acres Construction DisturbanceVEG 1187 Conifer Forest 0.04 Acres Operation DisturbanceVEG 1187 Developed/Disturbed 7.05 Acres Construction DisturbanceVEG 1187 Developed/Disturbed 1.86 Acres Operation DisturbanceVEG 1187 Grassland 78.47 Acres Construction DisturbanceVEG 1187 Grassland 21.68 Acres Operation DisturbanceVEG 1187 Greasewood Flat 12.87 Acres Construction DisturbanceVEG 1187 Greasewood Flat 3.28 Acres Operation DisturbanceVEG 1187 Herbaceous Wetland 0.00 Acres Construction DisturbanceVEG 1187 Herbaceous Wetland 0.00 Acres Operation DisturbanceVEG 1187 Montane Grassland 0.00 Acres Construction DisturbanceVEG 1187 Montane Grassland 0.00 Acres Operation DisturbanceVEG 1187 Open Water 2.85 Acres Construction DisturbanceVEG 1187 Open Water 0.84 Acres Operation DisturbanceVEG 1187 Pinyon-Juniper 0.33 Acres Construction DisturbanceVEG 1187 Pinyon-Juniper 0.07 Acres Operation DisturbanceVEG 1187 Sagebrush Shrubland 420.96 Acres Construction DisturbanceVEG 1187 Sagebrush Shrubland 108.76 Acres Operation DisturbanceVEG 1187 Saltbush Shrubland 92.86 Acres Construction DisturbanceVEG 1187 Saltbush Shrubland 26.17 Acres Operation DisturbanceVEG 1187 Woody Riparian and Wetlands 0.32 Acres Construction DisturbanceVEG 1187 Woody Riparian and Wetlands 0.07 Acres Operation DisturbanceVEG 1190 Agriculture 313.78 Acres Construction DisturbanceVEG 1190 Agriculture 68.98 Acres Operation DisturbanceVEG 1190 Aspen Forest and Woodland 0.00 Acres Construction DisturbanceVEG 1190 Aspen Forest and Woodland 0.00 Acres Operation DisturbanceVEG 1190 Barren/Sparsely Vegetated 1.18 Acres Construction DisturbanceVEG 1190 Barren/Sparsely Vegetated 0.40 Acres Operation DisturbanceVEG 1190 Cliff and Canyon 0.96 Acres Construction DisturbanceVEG 1190 Cliff and Canyon 0.34 Acres Operation DisturbanceVEG 1190 Conifer Forest 1.68 Acres Construction DisturbanceVEG 1190 Conifer Forest 0.44 Acres Operation DisturbanceVEG 1190 Developed/Disturbed 52.70 Acres Construction DisturbanceVEG 1190 Developed/Disturbed 13.19 Acres Operation DisturbanceVEG 1190 Dunes 0.04 Acres Construction DisturbanceVEG 1190 Dunes 0.02 Acres Operation DisturbanceVEG 1190 Grassland 145.08 Acres Construction Disturbance

Page 303: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

VEG 1190 Grassland 33.92 Acres Operation DisturbanceVEG 1190 Greasewood Flat 26.50 Acres Construction DisturbanceVEG 1190 Greasewood Flat 6.91 Acres Operation DisturbanceVEG 1190 Herbaceous Wetland 3.07 Acres Construction DisturbanceVEG 1190 Herbaceous Wetland 1.01 Acres Operation DisturbanceVEG 1190 Montane Grassland 0.01 Acres Construction DisturbanceVEG 1190 Montane Grassland 0.00 Acres Operation DisturbanceVEG 1190 Montane Shrubland 2.37 Acres Construction DisturbanceVEG 1190 Montane Shrubland 0.75 Acres Operation DisturbanceVEG 1190 Open Water 3.65 Acres Construction DisturbanceVEG 1190 Open Water 0.91 Acres Operation DisturbanceVEG 1190 Pinyon-Juniper 0.85 Acres Construction DisturbanceVEG 1190 Pinyon-Juniper 0.22 Acres Operation DisturbanceVEG 1190 Riparian 0.01 Acres Construction DisturbanceVEG 1190 Riparian 0.00 Acres Operation DisturbanceVEG 1190 Sagebrush Shrubland 1148.00 Acres Construction DisturbanceVEG 1190 Sagebrush Shrubland 257.82 Acres Operation DisturbanceVEG 1190 Saltbush Shrubland 91.61 Acres Construction DisturbanceVEG 1190 Saltbush Shrubland 24.52 Acres Operation DisturbanceVEG 1190 Woody Riparian and Wetlands 15.72 Acres Construction DisturbanceVEG 1190 Woody Riparian and Wetlands 4.23 Acres Operation DisturbanceVEG 1210 Agriculture 0.21 Acres Construction DisturbanceVEG 1210 Agriculture 0.10 Acres Operation DisturbanceVEG 1210 Barren/Sparsely Vegetated 0.24 Acres Construction DisturbanceVEG 1210 Barren/Sparsely Vegetated 0.11 Acres Operation DisturbanceVEG 1210 Cliff and Canyon 0.61 Acres Construction DisturbanceVEG 1210 Cliff and Canyon 0.20 Acres Operation DisturbanceVEG 1210 Developed/Disturbed 6.79 Acres Construction DisturbanceVEG 1210 Developed/Disturbed 1.77 Acres Operation DisturbanceVEG 1210 Grassland 41.19 Acres Construction DisturbanceVEG 1210 Grassland 6.49 Acres Operation DisturbanceVEG 1210 Greasewood Flat 7.02 Acres Construction DisturbanceVEG 1210 Greasewood Flat 1.73 Acres Operation DisturbanceVEG 1210 Open Water 0.01 Acres Construction DisturbanceVEG 1210 Open Water 0.00 Acres Operation DisturbanceVEG 1210 Pinyon-Juniper 9.04 Acres Construction DisturbanceVEG 1210 Pinyon-Juniper 3.67 Acres Operation DisturbanceVEG 1210 Sagebrush Shrubland 208.12 Acres Construction DisturbanceVEG 1210 Sagebrush Shrubland 40.75 Acres Operation DisturbanceVEG 1210 Saltbush Shrubland 39.01 Acres Construction DisturbanceVEG 1210 Saltbush Shrubland 6.78 Acres Operation DisturbanceVEG 1210 Woody Riparian and Wetlands 0.12 Acres Construction DisturbanceVEG 1210 Woody Riparian and Wetlands 0.04 Acres Operation DisturbanceVEG 1211 Cliff and Canyon 1.88 Acres Construction DisturbanceVEG 1211 Cliff and Canyon 0.43 Acres Operation Disturbance

Page 304: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

VEG 1211 Developed/Disturbed 3.51 Acres Construction DisturbanceVEG 1211 Developed/Disturbed 0.81 Acres Operation DisturbanceVEG 1211 Grassland 0.69 Acres Construction DisturbanceVEG 1211 Grassland 0.19 Acres Operation DisturbanceVEG 1211 Greasewood Flat 0.06 Acres Construction DisturbanceVEG 1211 Greasewood Flat 0.02 Acres Operation DisturbanceVEG 1211 Pinyon-Juniper 23.82 Acres Construction DisturbanceVEG 1211 Pinyon-Juniper 5.59 Acres Operation DisturbanceVEG 1211 Sagebrush Shrubland 71.14 Acres Construction DisturbanceVEG 1211 Sagebrush Shrubland 16.44 Acres Operation DisturbanceVEG 1211 Saltbush Shrubland 1.85 Acres Construction DisturbanceVEG 1211 Saltbush Shrubland 0.43 Acres Operation DisturbanceVEG 1212 Barren/Sparsely Vegetated 6.40 Acres Construction DisturbanceVEG 1212 Barren/Sparsely Vegetated 2.83 Acres Operation DisturbanceVEG 1212 Cliff and Canyon 28.33 Acres Construction DisturbanceVEG 1212 Cliff and Canyon 11.93 Acres Operation DisturbanceVEG 1212 Developed/Disturbed 10.80 Acres Construction DisturbanceVEG 1212 Developed/Disturbed 4.07 Acres Operation DisturbanceVEG 1212 Grassland 6.66 Acres Construction DisturbanceVEG 1212 Grassland 2.41 Acres Operation DisturbanceVEG 1212 Greasewood Flat 1.86 Acres Construction DisturbanceVEG 1212 Greasewood Flat 0.74 Acres Operation DisturbanceVEG 1212 Pinyon-Juniper 8.91 Acres Construction DisturbanceVEG 1212 Pinyon-Juniper 3.70 Acres Operation DisturbanceVEG 1212 Sagebrush Shrubland 79.17 Acres Construction DisturbanceVEG 1212 Sagebrush Shrubland 32.02 Acres Operation DisturbanceVEG 1212 Saltbush Shrubland 84.97 Acres Construction DisturbanceVEG 1212 Saltbush Shrubland 35.16 Acres Operation DisturbanceVEG 1214 Barren/Sparsely Vegetated 0.02 Acres Construction DisturbanceVEG 1214 Barren/Sparsely Vegetated 0.01 Acres Operation DisturbanceVEG 1214 Cliff and Canyon 2.03 Acres Construction DisturbanceVEG 1214 Cliff and Canyon 0.46 Acres Operation DisturbanceVEG 1214 Developed/Disturbed 8.97 Acres Construction DisturbanceVEG 1214 Developed/Disturbed 1.82 Acres Operation DisturbanceVEG 1214 Grassland 17.93 Acres Construction DisturbanceVEG 1214 Grassland 3.77 Acres Operation DisturbanceVEG 1214 Greasewood Flat 0.93 Acres Construction DisturbanceVEG 1214 Greasewood Flat 0.21 Acres Operation DisturbanceVEG 1214 Pinyon-Juniper 16.03 Acres Construction DisturbanceVEG 1214 Pinyon-Juniper 3.38 Acres Operation DisturbanceVEG 1214 Sagebrush Shrubland 84.60 Acres Construction DisturbanceVEG 1214 Sagebrush Shrubland 20.23 Acres Operation DisturbanceVEG 1214 Saltbush Shrubland 14.86 Acres Construction DisturbanceVEG 1214 Saltbush Shrubland 3.73 Acres Operation DisturbanceVEG 1215 Barren/Sparsely Vegetated 0.00 Acres Construction Disturbance

Page 305: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

VEG 1215 Barren/Sparsely Vegetated 0.00 Acres Operation DisturbanceVEG 1215 Cliff and Canyon 0.29 Acres Construction DisturbanceVEG 1215 Cliff and Canyon 0.07 Acres Operation DisturbanceVEG 1215 Developed/Disturbed 5.83 Acres Construction DisturbanceVEG 1215 Developed/Disturbed 1.30 Acres Operation DisturbanceVEG 1215 Grassland 3.45 Acres Construction DisturbanceVEG 1215 Grassland 0.76 Acres Operation DisturbanceVEG 1215 Greasewood Flat 0.15 Acres Construction DisturbanceVEG 1215 Greasewood Flat 0.03 Acres Operation DisturbanceVEG 1215 Montane Grassland 0.08 Acres Construction DisturbanceVEG 1215 Montane Grassland 0.02 Acres Operation DisturbanceVEG 1215 Pinyon-Juniper 2.51 Acres Construction DisturbanceVEG 1215 Pinyon-Juniper 0.57 Acres Operation DisturbanceVEG 1215 Sagebrush Shrubland 75.87 Acres Construction DisturbanceVEG 1215 Sagebrush Shrubland 16.65 Acres Operation DisturbanceVEG 1215 Saltbush Shrubland 4.30 Acres Construction DisturbanceVEG 1215 Saltbush Shrubland 0.98 Acres Operation DisturbanceVEG 1215.05 Barren/Sparsely Vegetated 3.22 Acres Construction DisturbanceVEG 1215.05 Barren/Sparsely Vegetated 1.00 Acres Operation DisturbanceVEG 1215.05 Cliff and Canyon 16.37 Acres Construction DisturbanceVEG 1215.05 Cliff and Canyon 4.79 Acres Operation DisturbanceVEG 1215.05 Developed/Disturbed 6.06 Acres Construction DisturbanceVEG 1215.05 Developed/Disturbed 1.95 Acres Operation DisturbanceVEG 1215.05 Grassland 5.59 Acres Construction DisturbanceVEG 1215.05 Grassland 1.77 Acres Operation DisturbanceVEG 1215.05 Greasewood Flat 0.67 Acres Construction DisturbanceVEG 1215.05 Greasewood Flat 0.22 Acres Operation DisturbanceVEG 1215.05 Pinyon-Juniper 0.64 Acres Construction DisturbanceVEG 1215.05 Pinyon-Juniper 0.20 Acres Operation DisturbanceVEG 1215.05 Sagebrush Shrubland 32.11 Acres Construction DisturbanceVEG 1215.05 Sagebrush Shrubland 10.28 Acres Operation DisturbanceVEG 1215.05 Saltbush Shrubland 76.02 Acres Construction DisturbanceVEG 1215.05 Saltbush Shrubland 22.75 Acres Operation DisturbanceVEG 1217.01 Agriculture 4.06 Acres Construction DisturbanceVEG 1217.01 Agriculture 0.84 Acres Operation DisturbanceVEG 1217.01 Aspen Forest and Woodland 6.63 Acres Construction DisturbanceVEG 1217.01 Aspen Forest and Woodland 1.38 Acres Operation DisturbanceVEG 1217.01 Barren/Sparsely Vegetated 30.68 Acres Construction DisturbanceVEG 1217.01 Barren/Sparsely Vegetated 9.59 Acres Operation DisturbanceVEG 1217.01 Cliff and Canyon 92.91 Acres Construction DisturbanceVEG 1217.01 Cliff and Canyon 24.63 Acres Operation DisturbanceVEG 1217.01 Conifer Forest 28.39 Acres Construction DisturbanceVEG 1217.01 Conifer Forest 6.05 Acres Operation DisturbanceVEG 1217.01 Developed/Disturbed 34.24 Acres Construction DisturbanceVEG 1217.01 Developed/Disturbed 8.96 Acres Operation Disturbance

Page 306: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

VEG 1217.01 Grassland 95.34 Acres Construction DisturbanceVEG 1217.01 Grassland 24.18 Acres Operation DisturbanceVEG 1217.01 Greasewood Flat 66.75 Acres Construction DisturbanceVEG 1217.01 Greasewood Flat 18.49 Acres Operation DisturbanceVEG 1217.01 Herbaceous Wetland 2.07 Acres Construction DisturbanceVEG 1217.01 Herbaceous Wetland 0.44 Acres Operation DisturbanceVEG 1217.01 Montane Grassland 27.98 Acres Construction DisturbanceVEG 1217.01 Montane Grassland 6.32 Acres Operation DisturbanceVEG 1217.01 Montane Shrubland 4.83 Acres Construction DisturbanceVEG 1217.01 Montane Shrubland 1.11 Acres Operation DisturbanceVEG 1217.01 Open Water 2.70 Acres Construction DisturbanceVEG 1217.01 Open Water 0.80 Acres Operation DisturbanceVEG 1217.01 Pinyon-Juniper 217.15 Acres Construction DisturbanceVEG 1217.01 Pinyon-Juniper 52.59 Acres Operation DisturbanceVEG 1217.01 Sagebrush Shrubland 244.12 Acres Construction DisturbanceVEG 1217.01 Sagebrush Shrubland 63.20 Acres Operation DisturbanceVEG 1217.01 Saltbush Shrubland 288.77 Acres Construction DisturbanceVEG 1217.01 Saltbush Shrubland 77.90 Acres Operation DisturbanceVEG 1217.01 Woody Riparian and Wetlands 3.31 Acres Construction DisturbanceVEG 1217.01 Woody Riparian and Wetlands 0.91 Acres Operation DisturbanceVEG 1217.02 Agriculture 2.45 Acres Construction DisturbanceVEG 1217.02 Agriculture 0.65 Acres Operation DisturbanceVEG 1217.02 Aspen Forest and Woodland 90.85 Acres Construction DisturbanceVEG 1217.02 Aspen Forest and Woodland 26.16 Acres Operation DisturbanceVEG 1217.02 Cliff and Canyon 7.33 Acres Construction DisturbanceVEG 1217.02 Cliff and Canyon 2.22 Acres Operation DisturbanceVEG 1217.02 Conifer Forest 13.35 Acres Construction DisturbanceVEG 1217.02 Conifer Forest 4.65 Acres Operation DisturbanceVEG 1217.02 Developed/Disturbed 11.36 Acres Construction DisturbanceVEG 1217.02 Developed/Disturbed 2.94 Acres Operation DisturbanceVEG 1217.02 Herbaceous Wetland 1.52 Acres Construction DisturbanceVEG 1217.02 Herbaceous Wetland 0.42 Acres Operation DisturbanceVEG 1217.02 Montane Grassland 1.02 Acres Construction DisturbanceVEG 1217.02 Montane Grassland 0.39 Acres Operation DisturbanceVEG 1217.02 Montane Shrubland 29.86 Acres Construction DisturbanceVEG 1217.02 Montane Shrubland 10.10 Acres Operation DisturbanceVEG 1217.02 Pinyon-Juniper 36.16 Acres Construction DisturbanceVEG 1217.02 Pinyon-Juniper 11.58 Acres Operation DisturbanceVEG 1217.02 Sagebrush Shrubland 103.73 Acres Construction DisturbanceVEG 1217.02 Sagebrush Shrubland 31.61 Acres Operation DisturbanceVEG 1217.02 Saltbush Shrubland 0.17 Acres Construction DisturbanceVEG 1217.02 Saltbush Shrubland 0.05 Acres Operation DisturbanceVEG 1217.02 Woody Riparian and Wetlands 0.03 Acres Construction DisturbanceVEG 1217.02 Woody Riparian and Wetlands 0.01 Acres Operation DisturbanceVEG 1217.051 Agriculture 0.61 Acres Construction Disturbance

Page 307: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

VEG 1217.051 Agriculture 0.13 Acres Operation DisturbanceVEG 1217.051 Aspen Forest and Woodland 7.17 Acres Construction DisturbanceVEG 1217.051 Aspen Forest and Woodland 2.21 Acres Operation DisturbanceVEG 1217.051 Cliff and Canyon 5.71 Acres Construction DisturbanceVEG 1217.051 Cliff and Canyon 1.36 Acres Operation DisturbanceVEG 1217.051 Conifer Forest 2.40 Acres Construction DisturbanceVEG 1217.051 Conifer Forest 0.89 Acres Operation DisturbanceVEG 1217.051 Developed/Disturbed 21.78 Acres Construction DisturbanceVEG 1217.051 Developed/Disturbed 5.43 Acres Operation DisturbanceVEG 1217.051 Grassland 0.09 Acres Construction DisturbanceVEG 1217.051 Grassland 0.02 Acres Operation DisturbanceVEG 1217.051 Herbaceous Wetland 6.89 Acres Construction DisturbanceVEG 1217.051 Herbaceous Wetland 1.71 Acres Operation DisturbanceVEG 1217.051 Montane Grassland 3.64 Acres Construction DisturbanceVEG 1217.051 Montane Grassland 0.87 Acres Operation DisturbanceVEG 1217.051 Montane Shrubland 14.99 Acres Construction DisturbanceVEG 1217.051 Montane Shrubland 3.78 Acres Operation DisturbanceVEG 1217.051 Open Water 0.11 Acres Construction DisturbanceVEG 1217.051 Open Water 0.02 Acres Operation DisturbanceVEG 1217.051 Pinyon-Juniper 29.72 Acres Construction DisturbanceVEG 1217.051 Pinyon-Juniper 7.16 Acres Operation DisturbanceVEG 1217.051 Sagebrush Shrubland 173.67 Acres Construction DisturbanceVEG 1217.051 Sagebrush Shrubland 45.23 Acres Operation DisturbanceVEG 1217.051 Saltbush Shrubland 0.51 Acres Construction DisturbanceVEG 1217.051 Saltbush Shrubland 0.12 Acres Operation DisturbanceVEG 1217.051 Woody Riparian and Wetlands 1.25 Acres Construction DisturbanceVEG 1217.051 Woody Riparian and Wetlands 0.30 Acres Operation DisturbanceVEG 1217.052 Agriculture 0.47 Acres Construction DisturbanceVEG 1217.052 Agriculture 0.32 Acres Operation DisturbanceVEG 1217.052 Aspen Forest and Woodland 18.51 Acres Construction DisturbanceVEG 1217.052 Aspen Forest and Woodland 6.95 Acres Operation DisturbanceVEG 1217.052 Barren/Sparsely Vegetated 2.22 Acres Construction DisturbanceVEG 1217.052 Barren/Sparsely Vegetated 0.65 Acres Operation DisturbanceVEG 1217.052 Cliff and Canyon 3.42 Acres Construction DisturbanceVEG 1217.052 Cliff and Canyon 1.01 Acres Operation DisturbanceVEG 1217.052 Conifer Forest 4.54 Acres Construction DisturbanceVEG 1217.052 Conifer Forest 1.92 Acres Operation DisturbanceVEG 1217.052 Deciduous Forest 0.01 Acres Construction DisturbanceVEG 1217.052 Deciduous Forest 0.01 Acres Operation DisturbanceVEG 1217.052 Developed/Disturbed 25.10 Acres Construction DisturbanceVEG 1217.052 Developed/Disturbed 8.82 Acres Operation DisturbanceVEG 1217.052 Grassland 0.05 Acres Construction DisturbanceVEG 1217.052 Grassland 0.02 Acres Operation DisturbanceVEG 1217.052 Herbaceous Wetland 0.01 Acres Construction DisturbanceVEG 1217.052 Herbaceous Wetland 0.00 Acres Operation Disturbance

Page 308: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

VEG 1217.052 Montane Grassland 0.15 Acres Construction DisturbanceVEG 1217.052 Montane Grassland 0.07 Acres Operation DisturbanceVEG 1217.052 Montane Shrubland 65.48 Acres Construction DisturbanceVEG 1217.052 Montane Shrubland 26.37 Acres Operation DisturbanceVEG 1217.052 Open Water 0.04 Acres Construction DisturbanceVEG 1217.052 Open Water 0.01 Acres Operation DisturbanceVEG 1217.052 Pinyon-Juniper 128.52 Acres Construction DisturbanceVEG 1217.052 Pinyon-Juniper 44.17 Acres Operation DisturbanceVEG 1217.052 Sagebrush Shrubland 30.66 Acres Construction DisturbanceVEG 1217.052 Sagebrush Shrubland 10.76 Acres Operation DisturbanceVEG 1217.052 Saltbush Shrubland 0.63 Acres Construction DisturbanceVEG 1217.052 Saltbush Shrubland 0.18 Acres Operation DisturbanceVEG 1217.052 Woody Riparian and Wetlands 5.12 Acres Construction DisturbanceVEG 1217.052 Woody Riparian and Wetlands 1.56 Acres Operation DisturbanceVEG 1217.1 Agriculture 1.18 Acres Construction DisturbanceVEG 1217.1 Agriculture 0.65 Acres Operation DisturbanceVEG 1217.1 Aspen Forest and Woodland 5.14 Acres Construction DisturbanceVEG 1217.1 Aspen Forest and Woodland 1.12 Acres Operation DisturbanceVEG 1217.1 Barren/Sparsely Vegetated 0.23 Acres Construction DisturbanceVEG 1217.1 Barren/Sparsely Vegetated 0.06 Acres Operation DisturbanceVEG 1217.1 Cliff and Canyon 8.98 Acres Construction DisturbanceVEG 1217.1 Cliff and Canyon 3.02 Acres Operation DisturbanceVEG 1217.1 Conifer Forest 34.72 Acres Construction DisturbanceVEG 1217.1 Conifer Forest 7.46 Acres Operation DisturbanceVEG 1217.1 Developed/Disturbed 27.70 Acres Construction DisturbanceVEG 1217.1 Developed/Disturbed 7.51 Acres Operation DisturbanceVEG 1217.1 Grassland 6.03 Acres Construction DisturbanceVEG 1217.1 Grassland 1.30 Acres Operation DisturbanceVEG 1217.1 Greasewood Flat 6.85 Acres Construction DisturbanceVEG 1217.1 Greasewood Flat 1.84 Acres Operation DisturbanceVEG 1217.1 Herbaceous Wetland 1.78 Acres Construction DisturbanceVEG 1217.1 Herbaceous Wetland 0.62 Acres Operation DisturbanceVEG 1217.1 Montane Grassland 1.03 Acres Construction DisturbanceVEG 1217.1 Montane Grassland 0.31 Acres Operation DisturbanceVEG 1217.1 Montane Shrubland 25.84 Acres Construction DisturbanceVEG 1217.1 Montane Shrubland 5.47 Acres Operation DisturbanceVEG 1217.1 Open Water 0.01 Acres Construction DisturbanceVEG 1217.1 Open Water 0.01 Acres Operation DisturbanceVEG 1217.1 Pinyon-Juniper 133.64 Acres Construction DisturbanceVEG 1217.1 Pinyon-Juniper 37.58 Acres Operation DisturbanceVEG 1217.1 Sagebrush Shrubland 110.37 Acres Construction DisturbanceVEG 1217.1 Sagebrush Shrubland 32.84 Acres Operation DisturbanceVEG 1217.1 Saltbush Shrubland 1.42 Acres Construction DisturbanceVEG 1217.1 Saltbush Shrubland 0.55 Acres Operation DisturbanceVEG 1217.1 Woody Riparian and Wetlands 3.11 Acres Construction Disturbance

Page 309: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

VEG 1217.1 Woody Riparian and Wetlands 0.70 Acres Operation DisturbanceVEG 1217.15 Agriculture 15.83 Acres Construction DisturbanceVEG 1217.15 Agriculture 7.12 Acres Operation DisturbanceVEG 1217.15 Aspen Forest and Woodland 164.83 Acres Construction DisturbanceVEG 1217.15 Aspen Forest and Woodland 53.47 Acres Operation DisturbanceVEG 1217.15 Barren/Sparsely Vegetated 0.30 Acres Construction DisturbanceVEG 1217.15 Barren/Sparsely Vegetated 0.16 Acres Operation DisturbanceVEG 1217.15 Cliff and Canyon 1.28 Acres Construction DisturbanceVEG 1217.15 Cliff and Canyon 0.46 Acres Operation DisturbanceVEG 1217.15 Conifer Forest 87.12 Acres Construction DisturbanceVEG 1217.15 Conifer Forest 27.44 Acres Operation DisturbanceVEG 1217.15 Developed/Disturbed 34.78 Acres Construction DisturbanceVEG 1217.15 Developed/Disturbed 11.68 Acres Operation DisturbanceVEG 1217.15 Herbaceous Wetland 3.10 Acres Construction DisturbanceVEG 1217.15 Herbaceous Wetland 1.03 Acres Operation DisturbanceVEG 1217.15 Montane Grassland 6.95 Acres Construction DisturbanceVEG 1217.15 Montane Grassland 2.45 Acres Operation DisturbanceVEG 1217.15 Montane Shrubland 139.64 Acres Construction DisturbanceVEG 1217.15 Montane Shrubland 49.10 Acres Operation DisturbanceVEG 1217.15 Open Water 0.11 Acres Construction DisturbanceVEG 1217.15 Open Water 0.07 Acres Operation DisturbanceVEG 1217.15 Pinyon-Juniper 47.11 Acres Construction DisturbanceVEG 1217.15 Pinyon-Juniper 18.15 Acres Operation DisturbanceVEG 1217.15 Sagebrush Shrubland 131.15 Acres Construction DisturbanceVEG 1217.15 Sagebrush Shrubland 45.24 Acres Operation DisturbanceVEG 1217.15 Tundra 0.08 Acres Construction DisturbanceVEG 1217.15 Tundra 0.03 Acres Operation DisturbanceVEG 1217.15 Woody Riparian and Wetlands 1.47 Acres Construction DisturbanceVEG 1217.15 Woody Riparian and Wetlands 0.55 Acres Operation DisturbanceVEG 1218 Aspen Forest and Woodland 66.16 Acres Construction DisturbanceVEG 1218 Aspen Forest and Woodland 24.32 Acres Operation DisturbanceVEG 1218 Cliff and Canyon 4.84 Acres Construction DisturbanceVEG 1218 Cliff and Canyon 2.64 Acres Operation DisturbanceVEG 1218 Conifer Forest 91.52 Acres Construction DisturbanceVEG 1218 Conifer Forest 36.76 Acres Operation DisturbanceVEG 1218 Developed/Disturbed 4.75 Acres Construction DisturbanceVEG 1218 Developed/Disturbed 1.38 Acres Operation DisturbanceVEG 1218 Herbaceous Wetland 0.01 Acres Construction DisturbanceVEG 1218 Herbaceous Wetland 0.01 Acres Operation DisturbanceVEG 1218 Montane Grassland 1.76 Acres Construction DisturbanceVEG 1218 Montane Grassland 0.66 Acres Operation DisturbanceVEG 1218 Montane Shrubland 2.89 Acres Construction DisturbanceVEG 1218 Montane Shrubland 1.58 Acres Operation DisturbanceVEG 1218 Pinyon-Juniper 2.59 Acres Construction DisturbanceVEG 1218 Pinyon-Juniper 1.53 Acres Operation Disturbance

Page 310: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

VEG 1218 Sagebrush Shrubland 67.74 Acres Construction DisturbanceVEG 1218 Sagebrush Shrubland 26.33 Acres Operation DisturbanceVEG 1219.1 Aspen Forest and Woodland 5.39 Acres Construction DisturbanceVEG 1219.1 Aspen Forest and Woodland 1.11 Acres Operation DisturbanceVEG 1219.1 Conifer Forest 2.66 Acres Construction DisturbanceVEG 1219.1 Conifer Forest 0.47 Acres Operation DisturbanceVEG 1219.1 Developed/Disturbed 0.44 Acres Construction DisturbanceVEG 1219.1 Developed/Disturbed 0.10 Acres Operation DisturbanceVEG 1219.1 Montane Shrubland 0.45 Acres Construction DisturbanceVEG 1219.1 Montane Shrubland 0.10 Acres Operation DisturbanceVEG 1219.1 Sagebrush Shrubland 5.79 Acres Construction DisturbanceVEG 1219.1 Sagebrush Shrubland 1.18 Acres Operation DisturbanceVEG 1219.2 Aspen Forest and Woodland 92.69 Acres Construction DisturbanceVEG 1219.2 Aspen Forest and Woodland 30.38 Acres Operation DisturbanceVEG 1219.2 Cliff and Canyon 2.50 Acres Construction DisturbanceVEG 1219.2 Cliff and Canyon 1.05 Acres Operation DisturbanceVEG 1219.2 Conifer Forest 120.03 Acres Construction DisturbanceVEG 1219.2 Conifer Forest 41.69 Acres Operation DisturbanceVEG 1219.2 Deciduous Forest 0.02 Acres Construction DisturbanceVEG 1219.2 Deciduous Forest 0.00 Acres Operation DisturbanceVEG 1219.2 Developed/Disturbed 10.31 Acres Construction DisturbanceVEG 1219.2 Developed/Disturbed 3.19 Acres Operation DisturbanceVEG 1219.2 Herbaceous Wetland 0.10 Acres Construction DisturbanceVEG 1219.2 Herbaceous Wetland 0.03 Acres Operation DisturbanceVEG 1219.2 Montane Grassland 5.25 Acres Construction DisturbanceVEG 1219.2 Montane Grassland 1.81 Acres Operation DisturbanceVEG 1219.2 Montane Shrubland 34.41 Acres Construction DisturbanceVEG 1219.2 Montane Shrubland 11.29 Acres Operation DisturbanceVEG 1219.2 Pinyon-Juniper 3.81 Acres Construction DisturbanceVEG 1219.2 Pinyon-Juniper 1.46 Acres Operation DisturbanceVEG 1219.2 Sagebrush Shrubland 153.53 Acres Construction DisturbanceVEG 1219.2 Sagebrush Shrubland 51.32 Acres Operation DisturbanceVEG 1219.2 Woody Riparian and Wetlands 0.23 Acres Construction DisturbanceVEG 1219.2 Woody Riparian and Wetlands 0.07 Acres Operation DisturbanceVEG 1219.3 Aspen Forest and Woodland 0.09 Acres Construction DisturbanceVEG 1219.3 Aspen Forest and Woodland 0.02 Acres Operation DisturbanceVEG 1219.3 Cliff and Canyon 0.10 Acres Construction DisturbanceVEG 1219.3 Cliff and Canyon 0.02 Acres Operation DisturbanceVEG 1219.3 Developed/Disturbed 2.27 Acres Construction DisturbanceVEG 1219.3 Developed/Disturbed 0.48 Acres Operation DisturbanceVEG 1219.3 Montane Shrubland 5.27 Acres Construction DisturbanceVEG 1219.3 Montane Shrubland 1.11 Acres Operation DisturbanceVEG 1219.3 Pinyon-Juniper 2.30 Acres Construction DisturbanceVEG 1219.3 Pinyon-Juniper 0.48 Acres Operation DisturbanceVEG 1219.3 Sagebrush Shrubland 6.45 Acres Construction Disturbance

Page 311: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

VEG 1219.3 Sagebrush Shrubland 1.36 Acres Operation DisturbanceVEG 1219.3 Woody Riparian and Wetlands 0.34 Acres Construction DisturbanceVEG 1219.3 Woody Riparian and Wetlands 0.07 Acres Operation DisturbanceVEG 1219.4 Cliff and Canyon 0.64 Acres Construction DisturbanceVEG 1219.4 Cliff and Canyon 0.27 Acres Operation DisturbanceVEG 1219.4 Developed/Disturbed 0.29 Acres Construction DisturbanceVEG 1219.4 Developed/Disturbed 0.18 Acres Operation DisturbanceVEG 1219.4 Montane Grassland 0.11 Acres Construction DisturbanceVEG 1219.4 Montane Grassland 0.04 Acres Operation DisturbanceVEG 1219.4 Pinyon-Juniper 4.32 Acres Construction DisturbanceVEG 1219.4 Pinyon-Juniper 1.86 Acres Operation DisturbanceVEG 1219.4 Sagebrush Shrubland 10.51 Acres Construction DisturbanceVEG 1219.4 Sagebrush Shrubland 4.99 Acres Operation DisturbanceVEG 1219.4 Saltbush Shrubland 0.28 Acres Construction DisturbanceVEG 1219.4 Saltbush Shrubland 0.12 Acres Operation DisturbanceVEG 1219.45 Aspen Forest and Woodland 0.10 Acres Construction DisturbanceVEG 1219.45 Aspen Forest and Woodland 0.04 Acres Operation DisturbanceVEG 1219.45 Cliff and Canyon 3.31 Acres Construction DisturbanceVEG 1219.45 Cliff and Canyon 1.32 Acres Operation DisturbanceVEG 1219.45 Conifer Forest 0.09 Acres Construction DisturbanceVEG 1219.45 Conifer Forest 0.07 Acres Operation DisturbanceVEG 1219.45 Developed/Disturbed 1.07 Acres Construction DisturbanceVEG 1219.45 Developed/Disturbed 0.37 Acres Operation DisturbanceVEG 1219.45 Montane Grassland 0.08 Acres Construction DisturbanceVEG 1219.45 Montane Grassland 0.04 Acres Operation DisturbanceVEG 1219.45 Montane Shrubland 0.27 Acres Construction DisturbanceVEG 1219.45 Montane Shrubland 0.11 Acres Operation DisturbanceVEG 1219.45 Pinyon-Juniper 8.67 Acres Construction DisturbanceVEG 1219.45 Pinyon-Juniper 2.99 Acres Operation DisturbanceVEG 1219.45 Sagebrush Shrubland 19.51 Acres Construction DisturbanceVEG 1219.45 Sagebrush Shrubland 7.71 Acres Operation DisturbanceVEG 1219.45 Saltbush Shrubland 0.31 Acres Construction DisturbanceVEG 1219.45 Saltbush Shrubland 0.10 Acres Operation DisturbanceVEG 1219.5 Aspen Forest and Woodland 91.51 Acres Construction DisturbanceVEG 1219.5 Aspen Forest and Woodland 28.85 Acres Operation DisturbanceVEG 1219.5 Cliff and Canyon 10.74 Acres Construction DisturbanceVEG 1219.5 Cliff and Canyon 4.02 Acres Operation DisturbanceVEG 1219.5 Conifer Forest 36.41 Acres Construction DisturbanceVEG 1219.5 Conifer Forest 13.69 Acres Operation DisturbanceVEG 1219.5 Developed/Disturbed 5.01 Acres Construction DisturbanceVEG 1219.5 Developed/Disturbed 1.57 Acres Operation DisturbanceVEG 1219.5 Herbaceous Wetland 0.65 Acres Construction DisturbanceVEG 1219.5 Herbaceous Wetland 0.27 Acres Operation DisturbanceVEG 1219.5 Montane Grassland 3.84 Acres Construction DisturbanceVEG 1219.5 Montane Grassland 1.48 Acres Operation Disturbance

Page 312: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

VEG 1219.5 Montane Shrubland 49.33 Acres Construction DisturbanceVEG 1219.5 Montane Shrubland 16.74 Acres Operation DisturbanceVEG 1219.5 Open Water 0.11 Acres Construction DisturbanceVEG 1219.5 Open Water 0.08 Acres Operation DisturbanceVEG 1219.5 Pinyon-Juniper 17.13 Acres Construction DisturbanceVEG 1219.5 Pinyon-Juniper 5.96 Acres Operation DisturbanceVEG 1219.5 Sagebrush Shrubland 136.49 Acres Construction DisturbanceVEG 1219.5 Sagebrush Shrubland 47.72 Acres Operation DisturbanceVEG 1219.5 Saltbush Shrubland 0.51 Acres Construction DisturbanceVEG 1219.5 Saltbush Shrubland 0.20 Acres Operation DisturbanceVEG 1219.5 Woody Riparian and Wetlands 0.01 Acres Construction DisturbanceVEG 1219.5 Woody Riparian and Wetlands 0.01 Acres Operation DisturbanceVEG 1219.6 Aspen Forest and Woodland 10.91 Acres Construction DisturbanceVEG 1219.6 Aspen Forest and Woodland 2.68 Acres Operation DisturbanceVEG 1219.6 Cliff and Canyon 8.29 Acres Construction DisturbanceVEG 1219.6 Cliff and Canyon 1.98 Acres Operation DisturbanceVEG 1219.6 Conifer Forest 18.83 Acres Construction DisturbanceVEG 1219.6 Conifer Forest 4.26 Acres Operation DisturbanceVEG 1219.6 Developed/Disturbed 3.45 Acres Construction DisturbanceVEG 1219.6 Developed/Disturbed 0.75 Acres Operation DisturbanceVEG 1219.6 Grassland 0.04 Acres Construction DisturbanceVEG 1219.6 Grassland 0.01 Acres Operation DisturbanceVEG 1219.6 Montane Grassland 0.69 Acres Construction DisturbanceVEG 1219.6 Montane Grassland 0.23 Acres Operation DisturbanceVEG 1219.6 Montane Shrubland 8.83 Acres Construction DisturbanceVEG 1219.6 Montane Shrubland 2.18 Acres Operation DisturbanceVEG 1219.6 Pinyon-Juniper 4.32 Acres Construction DisturbanceVEG 1219.6 Pinyon-Juniper 1.06 Acres Operation DisturbanceVEG 1219.6 Sagebrush Shrubland 37.10 Acres Construction DisturbanceVEG 1219.6 Sagebrush Shrubland 9.21 Acres Operation DisturbanceVEG 1219.6 Saltbush Shrubland 0.07 Acres Construction DisturbanceVEG 1219.6 Saltbush Shrubland 0.02 Acres Operation DisturbanceVEG 1219.6 Woody Riparian and Wetlands 0.05 Acres Construction DisturbanceVEG 1219.6 Woody Riparian and Wetlands 0.01 Acres Operation DisturbanceVEG 1220 Agriculture 1.94 Acres Construction DisturbanceVEG 1220 Agriculture 0.61 Acres Operation DisturbanceVEG 1220 Aspen Forest and Woodland 29.52 Acres Construction DisturbanceVEG 1220 Aspen Forest and Woodland 6.94 Acres Operation DisturbanceVEG 1220 Barren/Sparsely Vegetated 62.29 Acres Construction DisturbanceVEG 1220 Barren/Sparsely Vegetated 17.38 Acres Operation DisturbanceVEG 1220 Cliff and Canyon 43.76 Acres Construction DisturbanceVEG 1220 Cliff and Canyon 10.70 Acres Operation DisturbanceVEG 1220 Conifer Forest 20.66 Acres Construction DisturbanceVEG 1220 Conifer Forest 4.78 Acres Operation DisturbanceVEG 1220 Desert Shrub 3.50 Acres Construction Disturbance

Page 313: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

VEG 1220 Desert Shrub 0.94 Acres Operation DisturbanceVEG 1220 Developed/Disturbed 92.01 Acres Construction DisturbanceVEG 1220 Developed/Disturbed 24.49 Acres Operation DisturbanceVEG 1220 Dunes 1.50 Acres Construction DisturbanceVEG 1220 Dunes 0.37 Acres Operation DisturbanceVEG 1220 Grassland 76.31 Acres Construction DisturbanceVEG 1220 Grassland 19.32 Acres Operation DisturbanceVEG 1220 Greasewood Flat 177.28 Acres Construction DisturbanceVEG 1220 Greasewood Flat 44.37 Acres Operation DisturbanceVEG 1220 Herbaceous Wetland 2.64 Acres Construction DisturbanceVEG 1220 Herbaceous Wetland 0.54 Acres Operation DisturbanceVEG 1220 Montane Grassland 0.13 Acres Construction DisturbanceVEG 1220 Montane Grassland 0.05 Acres Operation DisturbanceVEG 1220 Montane Shrubland 110.31 Acres Construction DisturbanceVEG 1220 Montane Shrubland 24.32 Acres Operation DisturbanceVEG 1220 Open Water 12.84 Acres Construction DisturbanceVEG 1220 Open Water 2.65 Acres Operation DisturbanceVEG 1220 Pinyon-Juniper 561.84 Acres Construction DisturbanceVEG 1220 Pinyon-Juniper 121.66 Acres Operation DisturbanceVEG 1220 Sagebrush Shrubland 596.32 Acres Construction DisturbanceVEG 1220 Sagebrush Shrubland 123.90 Acres Operation DisturbanceVEG 1220 Saltbush Shrubland 633.95 Acres Construction DisturbanceVEG 1220 Saltbush Shrubland 171.28 Acres Operation DisturbanceVEG 1220 Woody Riparian and Wetlands 10.30 Acres Construction DisturbanceVEG 1220 Woody Riparian and Wetlands 2.47 Acres Operation DisturbanceVEG 1222.05 Agriculture 16.86 Acres Construction DisturbanceVEG 1222.05 Agriculture 3.10 Acres Operation DisturbanceVEG 1222.05 Barren/Sparsely Vegetated 41.02 Acres Construction DisturbanceVEG 1222.05 Barren/Sparsely Vegetated 7.64 Acres Operation DisturbanceVEG 1222.05 Cliff and Canyon 15.78 Acres Construction DisturbanceVEG 1222.05 Cliff and Canyon 2.64 Acres Operation DisturbanceVEG 1222.05 Desert Shrub 3.13 Acres Construction DisturbanceVEG 1222.05 Desert Shrub 0.72 Acres Operation DisturbanceVEG 1222.05 Developed/Disturbed 15.90 Acres Construction DisturbanceVEG 1222.05 Developed/Disturbed 2.90 Acres Operation DisturbanceVEG 1222.05 Dunes 0.01 Acres Construction DisturbanceVEG 1222.05 Dunes 0.00 Acres Operation DisturbanceVEG 1222.05 Grassland 20.82 Acres Construction DisturbanceVEG 1222.05 Grassland 3.33 Acres Operation DisturbanceVEG 1222.05 Greasewood Flat 80.39 Acres Construction DisturbanceVEG 1222.05 Greasewood Flat 13.87 Acres Operation DisturbanceVEG 1222.05 Open Water 0.03 Acres Construction DisturbanceVEG 1222.05 Open Water 0.01 Acres Operation DisturbanceVEG 1222.05 Pinyon-Juniper 26.62 Acres Construction DisturbanceVEG 1222.05 Pinyon-Juniper 4.63 Acres Operation Disturbance

Page 314: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

VEG 1222.05 Sagebrush Shrubland 8.53 Acres Construction DisturbanceVEG 1222.05 Sagebrush Shrubland 1.78 Acres Operation DisturbanceVEG 1222.05 Saltbush Shrubland 246.57 Acres Construction DisturbanceVEG 1222.05 Saltbush Shrubland 42.73 Acres Operation DisturbanceVEG 1222.05 Woody Riparian and Wetlands 12.38 Acres Construction DisturbanceVEG 1222.05 Woody Riparian and Wetlands 2.30 Acres Operation DisturbanceVEG 1222.3 Agriculture 3.08 Acres Construction DisturbanceVEG 1222.3 Agriculture 0.87 Acres Operation DisturbanceVEG 1222.3 Barren/Sparsely Vegetated 1.41 Acres Construction DisturbanceVEG 1222.3 Barren/Sparsely Vegetated 0.50 Acres Operation DisturbanceVEG 1222.3 Cliff and Canyon 13.72 Acres Construction DisturbanceVEG 1222.3 Cliff and Canyon 3.89 Acres Operation DisturbanceVEG 1222.3 Developed/Disturbed 51.22 Acres Construction DisturbanceVEG 1222.3 Developed/Disturbed 14.54 Acres Operation DisturbanceVEG 1222.3 Grassland 2.24 Acres Construction DisturbanceVEG 1222.3 Grassland 0.57 Acres Operation DisturbanceVEG 1222.3 Greasewood Flat 2.79 Acres Construction DisturbanceVEG 1222.3 Greasewood Flat 0.74 Acres Operation DisturbanceVEG 1222.3 Montane Shrubland 0.01 Acres Construction DisturbanceVEG 1222.3 Montane Shrubland 0.01 Acres Operation DisturbanceVEG 1222.3 Pinyon-Juniper 37.81 Acres Construction DisturbanceVEG 1222.3 Pinyon-Juniper 9.54 Acres Operation DisturbanceVEG 1222.3 Sagebrush Shrubland 80.43 Acres Construction DisturbanceVEG 1222.3 Sagebrush Shrubland 17.74 Acres Operation DisturbanceVEG 1222.3 Saltbush Shrubland 22.33 Acres Construction DisturbanceVEG 1222.3 Saltbush Shrubland 6.01 Acres Operation DisturbanceVEG 1222.3 Woody Riparian and Wetlands 0.75 Acres Construction DisturbanceVEG 1222.3 Woody Riparian and Wetlands 0.23 Acres Operation DisturbanceVEG 1223 Agriculture 0.00 Acres Construction DisturbanceVEG 1223 Agriculture 0.00 Acres Operation DisturbanceVEG 1223 Aspen Forest and Woodland 0.04 Acres Construction DisturbanceVEG 1223 Aspen Forest and Woodland 0.02 Acres Operation DisturbanceVEG 1223 Barren/Sparsely Vegetated 1.63 Acres Construction DisturbanceVEG 1223 Barren/Sparsely Vegetated 0.45 Acres Operation DisturbanceVEG 1223 Cliff and Canyon 8.15 Acres Construction DisturbanceVEG 1223 Cliff and Canyon 2.72 Acres Operation DisturbanceVEG 1223 Conifer Forest 0.52 Acres Construction DisturbanceVEG 1223 Conifer Forest 0.27 Acres Operation DisturbanceVEG 1223 Developed/Disturbed 26.74 Acres Construction DisturbanceVEG 1223 Developed/Disturbed 5.90 Acres Operation DisturbanceVEG 1223 Grassland 1.01 Acres Construction DisturbanceVEG 1223 Grassland 0.40 Acres Operation DisturbanceVEG 1223 Greasewood Flat 1.90 Acres Construction DisturbanceVEG 1223 Greasewood Flat 0.59 Acres Operation DisturbanceVEG 1223 Montane Grassland 0.01 Acres Construction Disturbance

Page 315: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

VEG 1223 Montane Grassland 0.00 Acres Operation DisturbanceVEG 1223 Montane Shrubland 3.33 Acres Construction DisturbanceVEG 1223 Montane Shrubland 1.08 Acres Operation DisturbanceVEG 1223 Open Water 0.02 Acres Construction DisturbanceVEG 1223 Open Water 0.01 Acres Operation DisturbanceVEG 1223 Pinyon-Juniper 105.30 Acres Construction DisturbanceVEG 1223 Pinyon-Juniper 26.02 Acres Operation DisturbanceVEG 1223 Sagebrush Shrubland 100.65 Acres Construction DisturbanceVEG 1223 Sagebrush Shrubland 23.94 Acres Operation DisturbanceVEG 1223 Saltbush Shrubland 12.33 Acres Construction DisturbanceVEG 1223 Saltbush Shrubland 4.47 Acres Operation DisturbanceVEG 1223 Woody Riparian and Wetlands 1.40 Acres Construction DisturbanceVEG 1223 Woody Riparian and Wetlands 0.30 Acres Operation DisturbanceVEG 1225.2 Agriculture 0.16 Acres Construction DisturbanceVEG 1225.2 Agriculture 0.06 Acres Operation DisturbanceVEG 1225.2 Barren/Sparsely Vegetated 48.42 Acres Construction DisturbanceVEG 1225.2 Barren/Sparsely Vegetated 9.00 Acres Operation DisturbanceVEG 1225.2 Cliff and Canyon 44.55 Acres Construction DisturbanceVEG 1225.2 Cliff and Canyon 9.05 Acres Operation DisturbanceVEG 1225.2 Desert Shrub 17.26 Acres Construction DisturbanceVEG 1225.2 Desert Shrub 3.33 Acres Operation DisturbanceVEG 1225.2 Developed/Disturbed 12.12 Acres Construction DisturbanceVEG 1225.2 Developed/Disturbed 2.39 Acres Operation DisturbanceVEG 1225.2 Dunes 1.90 Acres Construction DisturbanceVEG 1225.2 Dunes 0.41 Acres Operation DisturbanceVEG 1225.2 Grassland 79.00 Acres Construction DisturbanceVEG 1225.2 Grassland 15.72 Acres Operation DisturbanceVEG 1225.2 Greasewood Flat 26.78 Acres Construction DisturbanceVEG 1225.2 Greasewood Flat 5.50 Acres Operation DisturbanceVEG 1225.2 Pinyon-Juniper 90.32 Acres Construction DisturbanceVEG 1225.2 Pinyon-Juniper 19.29 Acres Operation DisturbanceVEG 1225.2 Sagebrush Shrubland 52.30 Acres Construction DisturbanceVEG 1225.2 Sagebrush Shrubland 10.99 Acres Operation DisturbanceVEG 1225.2 Saltbush Shrubland 164.74 Acres Construction DisturbanceVEG 1225.2 Saltbush Shrubland 34.29 Acres Operation DisturbanceVEG 1225.2 Woody Riparian and Wetlands 2.08 Acres Construction DisturbanceVEG 1225.2 Woody Riparian and Wetlands 0.41 Acres Operation DisturbanceVEG 1270 Agriculture 21.52 Acres Construction DisturbanceVEG 1270 Agriculture 4.19 Acres Operation DisturbanceVEG 1270 Barren/Sparsely Vegetated 3.00 Acres Construction DisturbanceVEG 1270 Barren/Sparsely Vegetated 0.52 Acres Operation DisturbanceVEG 1270 Cliff and Canyon 6.66 Acres Construction DisturbanceVEG 1270 Cliff and Canyon 1.34 Acres Operation DisturbanceVEG 1270 Developed/Disturbed 14.10 Acres Construction DisturbanceVEG 1270 Developed/Disturbed 2.69 Acres Operation Disturbance

Page 316: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

VEG 1270 Grassland 2.14 Acres Construction DisturbanceVEG 1270 Grassland 0.47 Acres Operation DisturbanceVEG 1270 Greasewood Flat 6.23 Acres Construction DisturbanceVEG 1270 Greasewood Flat 1.25 Acres Operation DisturbanceVEG 1270 Open Water 0.36 Acres Construction DisturbanceVEG 1270 Open Water 0.08 Acres Operation DisturbanceVEG 1270 Pinyon-Juniper 6.94 Acres Construction DisturbanceVEG 1270 Pinyon-Juniper 1.49 Acres Operation DisturbanceVEG 1270 Sagebrush Shrubland 15.10 Acres Construction DisturbanceVEG 1270 Sagebrush Shrubland 2.96 Acres Operation DisturbanceVEG 1270 Saltbush Shrubland 71.25 Acres Construction DisturbanceVEG 1270 Saltbush Shrubland 14.03 Acres Operation DisturbanceVEG 1270 Woody Riparian and Wetlands 2.36 Acres Construction DisturbanceVEG 1270 Woody Riparian and Wetlands 0.50 Acres Operation DisturbanceVEG 1310 Agriculture 37.11 Acres Construction DisturbanceVEG 1310 Agriculture 15.96 Acres Operation DisturbanceVEG 1310 Aspen Forest and Woodland 155.85 Acres Construction DisturbanceVEG 1310 Aspen Forest and Woodland 44.81 Acres Operation DisturbanceVEG 1310 Barren/Sparsely Vegetated 2.61 Acres Construction DisturbanceVEG 1310 Barren/Sparsely Vegetated 0.86 Acres Operation DisturbanceVEG 1310 Cliff and Canyon 17.85 Acres Construction DisturbanceVEG 1310 Cliff and Canyon 4.71 Acres Operation DisturbanceVEG 1310 Conifer Forest 138.45 Acres Construction DisturbanceVEG 1310 Conifer Forest 39.94 Acres Operation DisturbanceVEG 1310 Developed/Disturbed 49.20 Acres Construction DisturbanceVEG 1310 Developed/Disturbed 16.56 Acres Operation DisturbanceVEG 1310 Grassland 0.01 Acres Construction DisturbanceVEG 1310 Grassland 0.01 Acres Operation DisturbanceVEG 1310 Greasewood Flat 0.21 Acres Construction DisturbanceVEG 1310 Greasewood Flat 0.05 Acres Operation DisturbanceVEG 1310 Herbaceous Wetland 3.17 Acres Construction DisturbanceVEG 1310 Herbaceous Wetland 0.81 Acres Operation DisturbanceVEG 1310 Montane Grassland 19.17 Acres Construction DisturbanceVEG 1310 Montane Grassland 6.05 Acres Operation DisturbanceVEG 1310 Montane Shrubland 94.97 Acres Construction DisturbanceVEG 1310 Montane Shrubland 32.71 Acres Operation DisturbanceVEG 1310 Open Water 0.31 Acres Construction DisturbanceVEG 1310 Open Water 0.20 Acres Operation DisturbanceVEG 1310 Pinyon-Juniper 195.70 Acres Construction DisturbanceVEG 1310 Pinyon-Juniper 69.78 Acres Operation DisturbanceVEG 1310 Sagebrush Shrubland 198.82 Acres Construction DisturbanceVEG 1310 Sagebrush Shrubland 68.19 Acres Operation DisturbanceVEG 1310 Saltbush Shrubland 2.85 Acres Construction DisturbanceVEG 1310 Saltbush Shrubland 0.63 Acres Operation DisturbanceVEG 1310 Tundra 7.78 Acres Construction Disturbance

Page 317: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

VEG 1310 Tundra 2.11 Acres Operation DisturbanceVEG 1310 Woody Riparian and Wetlands 1.22 Acres Construction DisturbanceVEG 1310 Woody Riparian and Wetlands 0.48 Acres Operation DisturbanceVEG 1320.05 Agriculture 119.68 Acres Construction DisturbanceVEG 1320.05 Agriculture 19.39 Acres Operation DisturbanceVEG 1320.05 Barren/Sparsely Vegetated 7.20 Acres Construction DisturbanceVEG 1320.05 Barren/Sparsely Vegetated 1.59 Acres Operation DisturbanceVEG 1320.05 Cliff and Canyon 19.61 Acres Construction DisturbanceVEG 1320.05 Cliff and Canyon 3.76 Acres Operation DisturbanceVEG 1320.05 Developed/Disturbed 82.69 Acres Construction DisturbanceVEG 1320.05 Developed/Disturbed 13.49 Acres Operation DisturbanceVEG 1320.05 Grassland 32.40 Acres Construction DisturbanceVEG 1320.05 Grassland 6.30 Acres Operation DisturbanceVEG 1320.05 Greasewood Flat 23.63 Acres Construction DisturbanceVEG 1320.05 Greasewood Flat 3.98 Acres Operation DisturbanceVEG 1320.05 Herbaceous Wetland 0.64 Acres Construction DisturbanceVEG 1320.05 Herbaceous Wetland 0.12 Acres Operation DisturbanceVEG 1320.05 Montane Grassland 0.01 Acres Construction DisturbanceVEG 1320.05 Montane Grassland 0.00 Acres Operation DisturbanceVEG 1320.05 Montane Shrubland 0.03 Acres Construction DisturbanceVEG 1320.05 Montane Shrubland 0.01 Acres Operation DisturbanceVEG 1320.05 Open Water 2.36 Acres Construction DisturbanceVEG 1320.05 Open Water 0.59 Acres Operation DisturbanceVEG 1320.05 Pinyon-Juniper 10.43 Acres Construction DisturbanceVEG 1320.05 Pinyon-Juniper 1.69 Acres Operation DisturbanceVEG 1320.05 Sagebrush Shrubland 148.46 Acres Construction DisturbanceVEG 1320.05 Sagebrush Shrubland 23.36 Acres Operation DisturbanceVEG 1320.05 Saltbush Shrubland 43.39 Acres Construction DisturbanceVEG 1320.05 Saltbush Shrubland 7.98 Acres Operation DisturbanceVEG 1320.05 Woody Riparian and Wetlands 9.03 Acres Construction DisturbanceVEG 1320.05 Woody Riparian and Wetlands 1.63 Acres Operation DisturbanceVEG 1320.15 Agriculture 6.85 Acres Construction DisturbanceVEG 1320.15 Agriculture 3.59 Acres Operation DisturbanceVEG 1320.15 Aspen Forest and Woodland 18.91 Acres Construction DisturbanceVEG 1320.15 Aspen Forest and Woodland 6.90 Acres Operation DisturbanceVEG 1320.15 Cliff and Canyon 1.26 Acres Construction DisturbanceVEG 1320.15 Cliff and Canyon 0.60 Acres Operation DisturbanceVEG 1320.15 Conifer Forest 8.85 Acres Construction DisturbanceVEG 1320.15 Conifer Forest 3.38 Acres Operation DisturbanceVEG 1320.15 Deciduous Forest 3.61 Acres Construction DisturbanceVEG 1320.15 Deciduous Forest 1.30 Acres Operation DisturbanceVEG 1320.15 Developed/Disturbed 24.69 Acres Construction DisturbanceVEG 1320.15 Developed/Disturbed 10.84 Acres Operation DisturbanceVEG 1320.15 Grassland 5.20 Acres Construction DisturbanceVEG 1320.15 Grassland 2.57 Acres Operation Disturbance

Page 318: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

VEG 1320.15 Greasewood Flat 0.26 Acres Construction DisturbanceVEG 1320.15 Greasewood Flat 0.19 Acres Operation DisturbanceVEG 1320.15 Herbaceous Wetland 0.05 Acres Construction DisturbanceVEG 1320.15 Herbaceous Wetland 0.04 Acres Operation DisturbanceVEG 1320.15 Montane Grassland 1.32 Acres Construction DisturbanceVEG 1320.15 Montane Grassland 0.58 Acres Operation DisturbanceVEG 1320.15 Montane Shrubland 140.30 Acres Construction DisturbanceVEG 1320.15 Montane Shrubland 54.22 Acres Operation DisturbanceVEG 1320.15 Open Water 0.01 Acres Construction DisturbanceVEG 1320.15 Open Water 0.01 Acres Operation DisturbanceVEG 1320.15 Pinyon-Juniper 131.99 Acres Construction DisturbanceVEG 1320.15 Pinyon-Juniper 49.42 Acres Operation DisturbanceVEG 1320.15 Sagebrush Shrubland 152.31 Acres Construction DisturbanceVEG 1320.15 Sagebrush Shrubland 61.48 Acres Operation DisturbanceVEG 1320.15 Saltbush Shrubland 0.03 Acres Construction DisturbanceVEG 1320.15 Saltbush Shrubland 0.02 Acres Operation DisturbanceVEG 1320.15 Woody Riparian and Wetlands 6.14 Acres Construction DisturbanceVEG 1320.15 Woody Riparian and Wetlands 2.99 Acres Operation DisturbanceVEG 1320.2 Agriculture 2.03 Acres Construction DisturbanceVEG 1320.2 Agriculture 0.69 Acres Operation DisturbanceVEG 1320.2 Aspen Forest and Woodland 0.86 Acres Construction DisturbanceVEG 1320.2 Aspen Forest and Woodland 0.57 Acres Operation DisturbanceVEG 1320.2 Barren/Sparsely Vegetated 0.23 Acres Construction DisturbanceVEG 1320.2 Barren/Sparsely Vegetated 0.09 Acres Operation DisturbanceVEG 1320.2 Cliff and Canyon 2.03 Acres Construction DisturbanceVEG 1320.2 Cliff and Canyon 0.60 Acres Operation DisturbanceVEG 1320.2 Conifer Forest 0.02 Acres Construction DisturbanceVEG 1320.2 Conifer Forest 0.02 Acres Operation DisturbanceVEG 1320.2 Deciduous Forest 0.10 Acres Construction DisturbanceVEG 1320.2 Deciduous Forest 0.07 Acres Operation DisturbanceVEG 1320.2 Developed/Disturbed 3.18 Acres Construction DisturbanceVEG 1320.2 Developed/Disturbed 1.14 Acres Operation DisturbanceVEG 1320.2 Grassland 0.09 Acres Construction DisturbanceVEG 1320.2 Grassland 0.06 Acres Operation DisturbanceVEG 1320.2 Herbaceous Wetland 0.04 Acres Construction DisturbanceVEG 1320.2 Herbaceous Wetland 0.01 Acres Operation DisturbanceVEG 1320.2 Montane Grassland 0.31 Acres Construction DisturbanceVEG 1320.2 Montane Grassland 0.13 Acres Operation DisturbanceVEG 1320.2 Montane Shrubland 66.95 Acres Construction DisturbanceVEG 1320.2 Montane Shrubland 24.67 Acres Operation DisturbanceVEG 1320.2 Open Water 0.01 Acres Construction DisturbanceVEG 1320.2 Open Water 0.01 Acres Operation DisturbanceVEG 1320.2 Pinyon-Juniper 26.86 Acres Construction DisturbanceVEG 1320.2 Pinyon-Juniper 10.01 Acres Operation DisturbanceVEG 1320.2 Sagebrush Shrubland 16.25 Acres Construction Disturbance

Page 319: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

VEG 1320.2 Sagebrush Shrubland 7.26 Acres Operation DisturbanceVEG 1320.2 Woody Riparian and Wetlands 1.30 Acres Construction DisturbanceVEG 1320.2 Woody Riparian and Wetlands 0.45 Acres Operation DisturbanceVEG 1320.21 Developed/Disturbed 0.46 Acres Construction DisturbanceVEG 1320.21 Developed/Disturbed 0.16 Acres Operation DisturbanceVEG 1320.21 Montane Grassland 0.02 Acres Construction DisturbanceVEG 1320.21 Montane Grassland 0.01 Acres Operation DisturbanceVEG 1320.21 Montane Shrubland 3.13 Acres Construction DisturbanceVEG 1320.21 Montane Shrubland 1.11 Acres Operation DisturbanceVEG 1320.21 Pinyon-Juniper 1.29 Acres Construction DisturbanceVEG 1320.21 Pinyon-Juniper 0.62 Acres Operation DisturbanceVEG 1320.21 Sagebrush Shrubland 0.29 Acres Construction DisturbanceVEG 1320.21 Sagebrush Shrubland 0.12 Acres Operation DisturbanceVEG 1320.21 Woody Riparian and Wetlands 0.42 Acres Construction DisturbanceVEG 1320.21 Woody Riparian and Wetlands 0.15 Acres Operation DisturbanceVEG 1321 Agriculture 89.54 Acres Construction DisturbanceVEG 1321 Agriculture 11.00 Acres Operation DisturbanceVEG 1321 Barren/Sparsely Vegetated 0.00 Acres Construction DisturbanceVEG 1321 Barren/Sparsely Vegetated 0.00 Acres Operation DisturbanceVEG 1321 Cliff and Canyon 4.53 Acres Construction DisturbanceVEG 1321 Cliff and Canyon 0.96 Acres Operation DisturbanceVEG 1321 Conifer Forest 0.11 Acres Construction DisturbanceVEG 1321 Conifer Forest 0.05 Acres Operation DisturbanceVEG 1321 Developed/Disturbed 21.21 Acres Construction DisturbanceVEG 1321 Developed/Disturbed 4.32 Acres Operation DisturbanceVEG 1321 Grassland 1.51 Acres Construction DisturbanceVEG 1321 Grassland 0.28 Acres Operation DisturbanceVEG 1321 Greasewood Flat 6.68 Acres Construction DisturbanceVEG 1321 Greasewood Flat 1.24 Acres Operation DisturbanceVEG 1321 Montane Grassland 0.11 Acres Construction DisturbanceVEG 1321 Montane Grassland 0.04 Acres Operation DisturbanceVEG 1321 Open Water 1.57 Acres Construction DisturbanceVEG 1321 Open Water 0.41 Acres Operation DisturbanceVEG 1321 Pinyon-Juniper 131.88 Acres Construction DisturbanceVEG 1321 Pinyon-Juniper 29.14 Acres Operation DisturbanceVEG 1321 Sagebrush Shrubland 140.04 Acres Construction DisturbanceVEG 1321 Sagebrush Shrubland 24.40 Acres Operation DisturbanceVEG 1321 Saltbush Shrubland 22.85 Acres Construction DisturbanceVEG 1321 Saltbush Shrubland 3.18 Acres Operation DisturbanceVEG 1321 Woody Riparian and Wetlands 3.69 Acres Construction DisturbanceVEG 1321 Woody Riparian and Wetlands 0.92 Acres Operation DisturbanceVEG 1321.01 Agriculture 88.29 Acres Construction DisturbanceVEG 1321.01 Agriculture 10.93 Acres Operation DisturbanceVEG 1321.01 Barren/Sparsely Vegetated 0.00 Acres Construction DisturbanceVEG 1321.01 Barren/Sparsely Vegetated 0.00 Acres Operation Disturbance

Page 320: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

VEG 1321.01 Cliff and Canyon 4.47 Acres Construction DisturbanceVEG 1321.01 Cliff and Canyon 0.95 Acres Operation DisturbanceVEG 1321.01 Conifer Forest 0.11 Acres Construction DisturbanceVEG 1321.01 Conifer Forest 0.05 Acres Operation DisturbanceVEG 1321.01 Developed/Disturbed 20.77 Acres Construction DisturbanceVEG 1321.01 Developed/Disturbed 4.25 Acres Operation DisturbanceVEG 1321.01 Grassland 1.49 Acres Construction DisturbanceVEG 1321.01 Grassland 0.28 Acres Operation DisturbanceVEG 1321.01 Greasewood Flat 6.60 Acres Construction DisturbanceVEG 1321.01 Greasewood Flat 1.23 Acres Operation DisturbanceVEG 1321.01 Montane Grassland 0.11 Acres Construction DisturbanceVEG 1321.01 Montane Grassland 0.04 Acres Operation DisturbanceVEG 1321.01 Open Water 1.56 Acres Construction DisturbanceVEG 1321.01 Open Water 0.40 Acres Operation DisturbanceVEG 1321.01 Pinyon-Juniper 126.59 Acres Construction DisturbanceVEG 1321.01 Pinyon-Juniper 28.19 Acres Operation DisturbanceVEG 1321.01 Sagebrush Shrubland 131.21 Acres Construction DisturbanceVEG 1321.01 Sagebrush Shrubland 23.32 Acres Operation DisturbanceVEG 1321.01 Saltbush Shrubland 22.54 Acres Construction DisturbanceVEG 1321.01 Saltbush Shrubland 3.16 Acres Operation DisturbanceVEG 1321.01 Woody Riparian and Wetlands 3.65 Acres Construction DisturbanceVEG 1321.01 Woody Riparian and Wetlands 0.91 Acres Operation DisturbanceVEG 1321.02 Developed/Disturbed 0.21 Acres Construction DisturbanceVEG 1321.02 Developed/Disturbed 0.03 Acres Operation DisturbanceVEG 1321.02 Pinyon-Juniper 5.33 Acres Construction DisturbanceVEG 1321.02 Pinyon-Juniper 0.61 Acres Operation DisturbanceVEG 1321.02 Sagebrush Shrubland 10.59 Acres Construction DisturbanceVEG 1321.02 Sagebrush Shrubland 0.97 Acres Operation DisturbanceVEG 1322 Agriculture 0.96 Acres Construction DisturbanceVEG 1322 Agriculture 0.23 Acres Operation DisturbanceVEG 1322 Cliff and Canyon 0.31 Acres Construction DisturbanceVEG 1322 Cliff and Canyon 0.06 Acres Operation DisturbanceVEG 1322 Conifer Forest 0.00 Acres Construction DisturbanceVEG 1322 Conifer Forest 0.00 Acres Operation DisturbanceVEG 1322 Developed/Disturbed 3.98 Acres Construction DisturbanceVEG 1322 Developed/Disturbed 0.85 Acres Operation DisturbanceVEG 1322 Grassland 0.53 Acres Construction DisturbanceVEG 1322 Grassland 0.10 Acres Operation DisturbanceVEG 1322 Greasewood Flat 0.04 Acres Construction DisturbanceVEG 1322 Greasewood Flat 0.01 Acres Operation DisturbanceVEG 1322 Herbaceous Wetland 0.05 Acres Construction DisturbanceVEG 1322 Herbaceous Wetland 0.01 Acres Operation DisturbanceVEG 1322 Montane Grassland 0.08 Acres Construction DisturbanceVEG 1322 Montane Grassland 0.01 Acres Operation DisturbanceVEG 1322 Open Water 0.01 Acres Construction Disturbance

Page 321: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

VEG 1322 Open Water 0.00 Acres Operation DisturbanceVEG 1322 Pinyon-Juniper 15.68 Acres Construction DisturbanceVEG 1322 Pinyon-Juniper 3.37 Acres Operation DisturbanceVEG 1322 Sagebrush Shrubland 56.18 Acres Construction DisturbanceVEG 1322 Sagebrush Shrubland 10.71 Acres Operation DisturbanceVEG 1322 Saltbush Shrubland 0.01 Acres Construction DisturbanceVEG 1322 Saltbush Shrubland 0.00 Acres Operation DisturbanceVEG 1322 Woody Riparian and Wetlands 0.02 Acres Construction DisturbanceVEG 1322 Woody Riparian and Wetlands 0.00 Acres Operation DisturbanceVEG 1322.01 Cliff and Canyon 0.17 Acres Construction DisturbanceVEG 1322.01 Cliff and Canyon 0.02 Acres Operation DisturbanceVEG 1322.01 Developed/Disturbed 0.56 Acres Construction DisturbanceVEG 1322.01 Developed/Disturbed 0.07 Acres Operation DisturbanceVEG 1322.01 Pinyon-Juniper 4.51 Acres Construction DisturbanceVEG 1322.01 Pinyon-Juniper 1.22 Acres Operation DisturbanceVEG 1322.01 Sagebrush Shrubland 14.94 Acres Construction DisturbanceVEG 1322.01 Sagebrush Shrubland 1.73 Acres Operation DisturbanceVEG 1322.02 Cliff and Canyon 0.16 Acres Construction DisturbanceVEG 1322.02 Cliff and Canyon 0.03 Acres Operation DisturbanceVEG 1322.02 Developed/Disturbed 1.62 Acres Construction DisturbanceVEG 1322.02 Developed/Disturbed 0.34 Acres Operation DisturbanceVEG 1322.02 Grassland 0.95 Acres Construction DisturbanceVEG 1322.02 Grassland 0.20 Acres Operation DisturbanceVEG 1322.02 Greasewood Flat 0.04 Acres Construction DisturbanceVEG 1322.02 Greasewood Flat 0.01 Acres Operation DisturbanceVEG 1322.02 Montane Grassland 0.04 Acres Construction DisturbanceVEG 1322.02 Montane Grassland 0.01 Acres Operation DisturbanceVEG 1322.02 Pinyon-Juniper 5.43 Acres Construction DisturbanceVEG 1322.02 Pinyon-Juniper 1.14 Acres Operation DisturbanceVEG 1322.02 Sagebrush Shrubland 50.04 Acres Construction DisturbanceVEG 1322.02 Sagebrush Shrubland 10.51 Acres Operation DisturbanceVEG 1322.11 Developed/Disturbed 0.41 Acres Construction DisturbanceVEG 1322.11 Developed/Disturbed 0.06 Acres Operation DisturbanceVEG 1322.11 Grassland 0.71 Acres Construction DisturbanceVEG 1322.11 Grassland 0.11 Acres Operation DisturbanceVEG 1322.11 Montane Grassland 0.15 Acres Construction DisturbanceVEG 1322.11 Montane Grassland 0.02 Acres Operation DisturbanceVEG 1322.11 Pinyon-Juniper 2.20 Acres Construction DisturbanceVEG 1322.11 Pinyon-Juniper 0.34 Acres Operation DisturbanceVEG 1322.11 Sagebrush Shrubland 38.50 Acres Construction DisturbanceVEG 1322.11 Sagebrush Shrubland 5.95 Acres Operation DisturbanceVEG 1322.12 Agriculture 19.41 Acres Construction DisturbanceVEG 1322.12 Agriculture 2.64 Acres Operation DisturbanceVEG 1322.12 Cliff and Canyon 0.17 Acres Construction DisturbanceVEG 1322.12 Cliff and Canyon 0.02 Acres Operation Disturbance

Page 322: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

VEG 1322.12 Developed/Disturbed 0.71 Acres Construction DisturbanceVEG 1322.12 Developed/Disturbed 0.10 Acres Operation DisturbanceVEG 1322.12 Herbaceous Wetland 0.52 Acres Construction DisturbanceVEG 1322.12 Herbaceous Wetland 0.07 Acres Operation DisturbanceVEG 1322.12 Pinyon-Juniper 2.14 Acres Construction DisturbanceVEG 1322.12 Pinyon-Juniper 0.29 Acres Operation DisturbanceVEG 1322.12 Sagebrush Shrubland 2.72 Acres Construction DisturbanceVEG 1322.12 Sagebrush Shrubland 0.37 Acres Operation DisturbanceVEG 1322.12 Woody Riparian and Wetlands 0.19 Acres Construction DisturbanceVEG 1322.12 Woody Riparian and Wetlands 0.03 Acres Operation DisturbanceVEG 1322.21 Agriculture 4.38 Acres Construction DisturbanceVEG 1322.21 Agriculture 1.08 Acres Operation DisturbanceVEG 1322.21 Developed/Disturbed 2.40 Acres Construction DisturbanceVEG 1322.21 Developed/Disturbed 0.59 Acres Operation DisturbanceVEG 1322.21 Greasewood Flat 0.04 Acres Construction DisturbanceVEG 1322.21 Greasewood Flat 0.01 Acres Operation DisturbanceVEG 1322.21 Herbaceous Wetland 0.11 Acres Construction DisturbanceVEG 1322.21 Herbaceous Wetland 0.03 Acres Operation DisturbanceVEG 1322.21 Open Water 0.19 Acres Construction DisturbanceVEG 1322.21 Open Water 0.05 Acres Operation DisturbanceVEG 1322.21 Pinyon-Juniper 11.18 Acres Construction DisturbanceVEG 1322.21 Pinyon-Juniper 2.75 Acres Operation DisturbanceVEG 1322.21 Sagebrush Shrubland 5.19 Acres Construction DisturbanceVEG 1322.21 Sagebrush Shrubland 1.28 Acres Operation DisturbanceVEG 1322.22 Agriculture 31.79 Acres Construction DisturbanceVEG 1322.22 Agriculture 4.31 Acres Operation DisturbanceVEG 1322.22 Cliff and Canyon 0.36 Acres Construction DisturbanceVEG 1322.22 Cliff and Canyon 0.05 Acres Operation DisturbanceVEG 1322.22 Developed/Disturbed 4.67 Acres Construction DisturbanceVEG 1322.22 Developed/Disturbed 0.63 Acres Operation DisturbanceVEG 1322.22 Greasewood Flat 0.00 Acres Construction DisturbanceVEG 1322.22 Greasewood Flat 0.00 Acres Operation DisturbanceVEG 1322.22 Herbaceous Wetland 1.56 Acres Construction DisturbanceVEG 1322.22 Herbaceous Wetland 0.21 Acres Operation DisturbanceVEG 1322.22 Montane Grassland 0.01 Acres Construction DisturbanceVEG 1322.22 Montane Grassland 0.00 Acres Operation DisturbanceVEG 1322.22 Open Water 0.20 Acres Construction DisturbanceVEG 1322.22 Open Water 0.03 Acres Operation DisturbanceVEG 1322.22 Pinyon-Juniper 4.40 Acres Construction DisturbanceVEG 1322.22 Pinyon-Juniper 0.60 Acres Operation DisturbanceVEG 1322.22 Sagebrush Shrubland 13.47 Acres Construction DisturbanceVEG 1322.22 Sagebrush Shrubland 1.83 Acres Operation DisturbanceVEG 1322.23 Agriculture 7.99 Acres Construction DisturbanceVEG 1322.23 Agriculture 0.82 Acres Operation DisturbanceVEG 1322.23 Aspen Forest and Woodland 0.03 Acres Construction Disturbance

Page 323: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

VEG 1322.23 Aspen Forest and Woodland 0.02 Acres Operation DisturbanceVEG 1322.23 Cliff and Canyon 0.03 Acres Construction DisturbanceVEG 1322.23 Cliff and Canyon 0.00 Acres Operation DisturbanceVEG 1322.23 Conifer Forest 0.29 Acres Construction DisturbanceVEG 1322.23 Conifer Forest 0.04 Acres Operation DisturbanceVEG 1322.23 Developed/Disturbed 1.34 Acres Construction DisturbanceVEG 1322.23 Developed/Disturbed 0.18 Acres Operation DisturbanceVEG 1322.23 Herbaceous Wetland 1.56 Acres Construction DisturbanceVEG 1322.23 Herbaceous Wetland 0.22 Acres Operation DisturbanceVEG 1322.23 Montane Shrubland 5.30 Acres Construction DisturbanceVEG 1322.23 Montane Shrubland 1.39 Acres Operation DisturbanceVEG 1322.23 Pinyon-Juniper 9.22 Acres Construction DisturbanceVEG 1322.23 Pinyon-Juniper 2.09 Acres Operation DisturbanceVEG 1322.23 Sagebrush Shrubland 2.90 Acres Construction DisturbanceVEG 1322.23 Sagebrush Shrubland 0.65 Acres Operation DisturbanceVEG 1322.23 Woody Riparian and Wetlands 0.07 Acres Construction DisturbanceVEG 1322.23 Woody Riparian and Wetlands 0.04 Acres Operation DisturbanceVEG 1322.5 Agriculture 1.13 Acres Construction DisturbanceVEG 1322.5 Agriculture 0.30 Acres Operation DisturbanceVEG 1322.5 Cliff and Canyon 0.41 Acres Construction DisturbanceVEG 1322.5 Cliff and Canyon 0.08 Acres Operation DisturbanceVEG 1322.5 Conifer Forest 0.00 Acres Construction DisturbanceVEG 1322.5 Conifer Forest 0.00 Acres Operation DisturbanceVEG 1322.5 Developed/Disturbed 4.92 Acres Construction DisturbanceVEG 1322.5 Developed/Disturbed 1.17 Acres Operation DisturbanceVEG 1322.5 Grassland 0.69 Acres Construction DisturbanceVEG 1322.5 Grassland 0.15 Acres Operation DisturbanceVEG 1322.5 Greasewood Flat 0.05 Acres Construction DisturbanceVEG 1322.5 Greasewood Flat 0.01 Acres Operation DisturbanceVEG 1322.5 Herbaceous Wetland 0.07 Acres Construction DisturbanceVEG 1322.5 Herbaceous Wetland 0.02 Acres Operation DisturbanceVEG 1322.5 Montane Grassland 0.10 Acres Construction DisturbanceVEG 1322.5 Montane Grassland 0.02 Acres Operation DisturbanceVEG 1322.5 Open Water 0.02 Acres Construction DisturbanceVEG 1322.5 Open Water 0.00 Acres Operation DisturbanceVEG 1322.5 Pinyon-Juniper 19.37 Acres Construction DisturbanceVEG 1322.5 Pinyon-Juniper 4.60 Acres Operation DisturbanceVEG 1322.5 Sagebrush Shrubland 72.93 Acres Construction DisturbanceVEG 1322.5 Sagebrush Shrubland 15.34 Acres Operation DisturbanceVEG 1322.5 Saltbush Shrubland 0.01 Acres Construction DisturbanceVEG 1322.5 Saltbush Shrubland 0.00 Acres Operation DisturbanceVEG 1322.5 Woody Riparian and Wetlands 0.02 Acres Construction DisturbanceVEG 1322.5 Woody Riparian and Wetlands 0.01 Acres Operation DisturbanceVEG 1322.51 Developed/Disturbed 12.75 Acres Construction DisturbanceVEG 1322.51 Developed/Disturbed 2.09 Acres Operation Disturbance

Page 324: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

VEG 1322.51 Grassland 0.06 Acres Construction DisturbanceVEG 1322.51 Grassland 0.01 Acres Operation DisturbanceVEG 1322.51 Greasewood Flat 0.07 Acres Construction DisturbanceVEG 1322.51 Greasewood Flat 0.01 Acres Operation DisturbanceVEG 1322.51 Montane Grassland 0.03 Acres Construction DisturbanceVEG 1322.51 Montane Grassland 0.00 Acres Operation DisturbanceVEG 1322.51 Pinyon-Juniper 19.53 Acres Construction DisturbanceVEG 1322.51 Pinyon-Juniper 3.20 Acres Operation DisturbanceVEG 1322.51 Sagebrush Shrubland 41.50 Acres Construction DisturbanceVEG 1322.51 Sagebrush Shrubland 6.80 Acres Operation DisturbanceVEG 1322.52 Pinyon-Juniper 2.22 Acres Construction DisturbanceVEG 1322.52 Pinyon-Juniper 0.47 Acres Operation DisturbanceVEG 1322.52 Sagebrush Shrubland 8.92 Acres Construction DisturbanceVEG 1322.52 Sagebrush Shrubland 1.88 Acres Operation DisturbanceVEG 1322.53 Agriculture 3.83 Acres Construction DisturbanceVEG 1322.53 Agriculture 1.02 Acres Operation DisturbanceVEG 1322.53 Cliff and Canyon 1.08 Acres Construction DisturbanceVEG 1322.53 Cliff and Canyon 0.29 Acres Operation DisturbanceVEG 1322.53 Developed/Disturbed 0.17 Acres Construction DisturbanceVEG 1322.53 Developed/Disturbed 0.05 Acres Operation DisturbanceVEG 1322.53 Herbaceous Wetland 0.15 Acres Construction DisturbanceVEG 1322.53 Herbaceous Wetland 0.04 Acres Operation DisturbanceVEG 1322.53 Pinyon-Juniper 8.27 Acres Construction DisturbanceVEG 1322.53 Pinyon-Juniper 2.20 Acres Operation DisturbanceVEG 1322.53 Sagebrush Shrubland 11.75 Acres Construction DisturbanceVEG 1322.53 Sagebrush Shrubland 3.13 Acres Operation DisturbanceVEG 1322.53 Woody Riparian and Wetlands 0.02 Acres Construction DisturbanceVEG 1322.53 Woody Riparian and Wetlands 0.01 Acres Operation DisturbanceVEG 1322.71 Agriculture 21.51 Acres Construction DisturbanceVEG 1322.71 Agriculture 6.02 Acres Operation DisturbanceVEG 1322.71 Cliff and Canyon 0.63 Acres Construction DisturbanceVEG 1322.71 Cliff and Canyon 0.18 Acres Operation DisturbanceVEG 1322.71 Conifer Forest 0.17 Acres Construction DisturbanceVEG 1322.71 Conifer Forest 0.05 Acres Operation DisturbanceVEG 1322.71 Developed/Disturbed 16.08 Acres Construction DisturbanceVEG 1322.71 Developed/Disturbed 4.52 Acres Operation DisturbanceVEG 1322.71 Grassland 0.03 Acres Construction DisturbanceVEG 1322.71 Grassland 0.01 Acres Operation DisturbanceVEG 1322.71 Greasewood Flat 0.10 Acres Construction DisturbanceVEG 1322.71 Greasewood Flat 0.03 Acres Operation DisturbanceVEG 1322.71 Herbaceous Wetland 3.30 Acres Construction DisturbanceVEG 1322.71 Herbaceous Wetland 0.94 Acres Operation DisturbanceVEG 1322.71 Montane Grassland 0.13 Acres Construction DisturbanceVEG 1322.71 Montane Grassland 0.04 Acres Operation DisturbanceVEG 1322.71 Montane Shrubland 0.08 Acres Construction Disturbance

Page 325: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

VEG 1322.71 Montane Shrubland 0.02 Acres Operation DisturbanceVEG 1322.71 Open Water 0.24 Acres Construction DisturbanceVEG 1322.71 Open Water 0.07 Acres Operation DisturbanceVEG 1322.71 Pinyon-Juniper 106.51 Acres Construction DisturbanceVEG 1322.71 Pinyon-Juniper 30.03 Acres Operation DisturbanceVEG 1322.71 Sagebrush Shrubland 56.01 Acres Construction DisturbanceVEG 1322.71 Sagebrush Shrubland 15.66 Acres Operation DisturbanceVEG 1322.71 Saltbush Shrubland 0.17 Acres Construction DisturbanceVEG 1322.71 Saltbush Shrubland 0.05 Acres Operation DisturbanceVEG 1322.71 Woody Riparian and Wetlands 0.98 Acres Construction DisturbanceVEG 1322.71 Woody Riparian and Wetlands 0.27 Acres Operation DisturbanceVEG 1323 Agriculture 36.19 Acres Construction DisturbanceVEG 1323 Agriculture 16.14 Acres Operation DisturbanceVEG 1323 Aspen Forest and Woodland 49.84 Acres Construction DisturbanceVEG 1323 Aspen Forest and Woodland 15.89 Acres Operation DisturbanceVEG 1323 Cliff and Canyon 5.13 Acres Construction DisturbanceVEG 1323 Cliff and Canyon 1.86 Acres Operation DisturbanceVEG 1323 Conifer Forest 27.96 Acres Construction DisturbanceVEG 1323 Conifer Forest 9.08 Acres Operation DisturbanceVEG 1323 Deciduous Forest 7.10 Acres Construction DisturbanceVEG 1323 Deciduous Forest 2.17 Acres Operation DisturbanceVEG 1323 Developed/Disturbed 9.94 Acres Construction DisturbanceVEG 1323 Developed/Disturbed 3.79 Acres Operation DisturbanceVEG 1323 Greasewood Flat 0.01 Acres Construction DisturbanceVEG 1323 Greasewood Flat 0.01 Acres Operation DisturbanceVEG 1323 Herbaceous Wetland 5.02 Acres Construction DisturbanceVEG 1323 Herbaceous Wetland 1.85 Acres Operation DisturbanceVEG 1323 Montane Grassland 2.16 Acres Construction DisturbanceVEG 1323 Montane Grassland 0.55 Acres Operation DisturbanceVEG 1323 Montane Shrubland 13.62 Acres Construction DisturbanceVEG 1323 Montane Shrubland 4.94 Acres Operation DisturbanceVEG 1323 Open Water 0.13 Acres Construction DisturbanceVEG 1323 Open Water 0.08 Acres Operation DisturbanceVEG 1323 Pinyon-Juniper 24.09 Acres Construction DisturbanceVEG 1323 Pinyon-Juniper 9.01 Acres Operation DisturbanceVEG 1323 Sagebrush Shrubland 156.11 Acres Construction DisturbanceVEG 1323 Sagebrush Shrubland 54.21 Acres Operation DisturbanceVEG 1323 Woody Riparian and Wetlands 15.40 Acres Construction DisturbanceVEG 1323 Woody Riparian and Wetlands 5.07 Acres Operation DisturbanceVEG 1323.01 Agriculture 37.43 Acres Construction DisturbanceVEG 1323.01 Agriculture 9.62 Acres Operation DisturbanceVEG 1323.01 Cliff and Canyon 2.88 Acres Construction DisturbanceVEG 1323.01 Cliff and Canyon 0.74 Acres Operation DisturbanceVEG 1323.01 Conifer Forest 0.18 Acres Construction DisturbanceVEG 1323.01 Conifer Forest 0.04 Acres Operation Disturbance

Page 326: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

VEG 1323.01 Developed/Disturbed 5.33 Acres Construction DisturbanceVEG 1323.01 Developed/Disturbed 1.36 Acres Operation DisturbanceVEG 1323.01 Herbaceous Wetland 3.12 Acres Construction DisturbanceVEG 1323.01 Herbaceous Wetland 0.80 Acres Operation DisturbanceVEG 1323.01 Montane Grassland 0.01 Acres Construction DisturbanceVEG 1323.01 Montane Grassland 0.00 Acres Operation DisturbanceVEG 1323.01 Montane Shrubland 3.87 Acres Construction DisturbanceVEG 1323.01 Montane Shrubland 0.99 Acres Operation DisturbanceVEG 1323.01 Open Water 0.04 Acres Construction DisturbanceVEG 1323.01 Open Water 0.01 Acres Operation DisturbanceVEG 1323.01 Pinyon-Juniper 20.28 Acres Construction DisturbanceVEG 1323.01 Pinyon-Juniper 5.50 Acres Operation DisturbanceVEG 1323.01 Sagebrush Shrubland 20.28 Acres Construction DisturbanceVEG 1323.01 Sagebrush Shrubland 5.13 Acres Operation DisturbanceVEG 1323.01 Woody Riparian and Wetlands 0.33 Acres Construction DisturbanceVEG 1323.01 Woody Riparian and Wetlands 0.08 Acres Operation DisturbanceVEG 1323.02 Aspen Forest and Woodland 47.15 Acres Construction DisturbanceVEG 1323.02 Aspen Forest and Woodland 15.52 Acres Operation DisturbanceVEG 1323.02 Cliff and Canyon 2.64 Acres Construction DisturbanceVEG 1323.02 Cliff and Canyon 1.21 Acres Operation DisturbanceVEG 1323.02 Conifer Forest 25.91 Acres Construction DisturbanceVEG 1323.02 Conifer Forest 8.80 Acres Operation DisturbanceVEG 1323.02 Deciduous Forest 6.56 Acres Construction DisturbanceVEG 1323.02 Deciduous Forest 2.08 Acres Operation DisturbanceVEG 1323.02 Developed/Disturbed 4.23 Acres Construction DisturbanceVEG 1323.02 Developed/Disturbed 1.46 Acres Operation DisturbanceVEG 1323.02 Herbaceous Wetland 0.84 Acres Construction DisturbanceVEG 1323.02 Herbaceous Wetland 0.24 Acres Operation DisturbanceVEG 1323.02 Montane Grassland 1.90 Acres Construction DisturbanceVEG 1323.02 Montane Grassland 0.47 Acres Operation DisturbanceVEG 1323.02 Montane Shrubland 7.80 Acres Construction DisturbanceVEG 1323.02 Montane Shrubland 3.03 Acres Operation DisturbanceVEG 1323.02 Pinyon-Juniper 1.57 Acres Construction DisturbanceVEG 1323.02 Pinyon-Juniper 0.44 Acres Operation DisturbanceVEG 1323.02 Sagebrush Shrubland 128.96 Acres Construction DisturbanceVEG 1323.02 Sagebrush Shrubland 44.97 Acres Operation DisturbanceVEG 1323.02 Woody Riparian and Wetlands 14.92 Acres Construction DisturbanceVEG 1323.02 Woody Riparian and Wetlands 4.86 Acres Operation DisturbanceVEG 1324 Aspen Forest and Woodland 38.69 Acres Construction DisturbanceVEG 1324 Aspen Forest and Woodland 15.70 Acres Operation DisturbanceVEG 1324 Cliff and Canyon 1.08 Acres Construction DisturbanceVEG 1324 Cliff and Canyon 0.51 Acres Operation DisturbanceVEG 1324 Conifer Forest 4.89 Acres Construction DisturbanceVEG 1324 Conifer Forest 1.91 Acres Operation DisturbanceVEG 1324 Deciduous Forest 3.53 Acres Construction Disturbance

Page 327: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

VEG 1324 Deciduous Forest 1.21 Acres Operation DisturbanceVEG 1324 Developed/Disturbed 2.10 Acres Construction DisturbanceVEG 1324 Developed/Disturbed 0.81 Acres Operation DisturbanceVEG 1324 Grassland 0.07 Acres Construction DisturbanceVEG 1324 Grassland 0.05 Acres Operation DisturbanceVEG 1324 Herbaceous Wetland 0.77 Acres Construction DisturbanceVEG 1324 Herbaceous Wetland 0.28 Acres Operation DisturbanceVEG 1324 Montane Grassland 0.91 Acres Construction DisturbanceVEG 1324 Montane Grassland 0.36 Acres Operation DisturbanceVEG 1324 Montane Shrubland 1.26 Acres Construction DisturbanceVEG 1324 Montane Shrubland 0.77 Acres Operation DisturbanceVEG 1324 Sagebrush Shrubland 27.16 Acres Construction DisturbanceVEG 1324 Sagebrush Shrubland 11.24 Acres Operation DisturbanceVEG 1324 Woody Riparian and Wetlands 0.13 Acres Construction DisturbanceVEG 1324 Woody Riparian and Wetlands 0.06 Acres Operation DisturbanceVEG 1324.2 Aspen Forest and Woodland 42.30 Acres Construction DisturbanceVEG 1324.2 Aspen Forest and Woodland 15.88 Acres Operation DisturbanceVEG 1324.2 Cliff and Canyon 1.16 Acres Construction DisturbanceVEG 1324.2 Cliff and Canyon 0.51 Acres Operation DisturbanceVEG 1324.2 Conifer Forest 5.37 Acres Construction DisturbanceVEG 1324.2 Conifer Forest 1.93 Acres Operation DisturbanceVEG 1324.2 Deciduous Forest 3.92 Acres Construction DisturbanceVEG 1324.2 Deciduous Forest 1.23 Acres Operation DisturbanceVEG 1324.2 Developed/Disturbed 2.31 Acres Construction DisturbanceVEG 1324.2 Developed/Disturbed 0.82 Acres Operation DisturbanceVEG 1324.2 Grassland 0.08 Acres Construction DisturbanceVEG 1324.2 Grassland 0.05 Acres Operation DisturbanceVEG 1324.2 Herbaceous Wetland 0.85 Acres Construction DisturbanceVEG 1324.2 Herbaceous Wetland 0.28 Acres Operation DisturbanceVEG 1324.2 Montane Grassland 1.00 Acres Construction DisturbanceVEG 1324.2 Montane Grassland 0.36 Acres Operation DisturbanceVEG 1324.2 Montane Shrubland 1.30 Acres Construction DisturbanceVEG 1324.2 Montane Shrubland 0.78 Acres Operation DisturbanceVEG 1324.2 Sagebrush Shrubland 29.63 Acres Construction DisturbanceVEG 1324.2 Sagebrush Shrubland 11.37 Acres Operation DisturbanceVEG 1324.2 Woody Riparian and Wetlands 0.13 Acres Construction DisturbanceVEG 1324.2 Woody Riparian and Wetlands 0.06 Acres Operation DisturbanceVEG 1324.4 Aspen Forest and Woodland 50.90 Acres Construction DisturbanceVEG 1324.4 Aspen Forest and Woodland 16.07 Acres Operation DisturbanceVEG 1324.4 Cliff and Canyon 1.35 Acres Construction DisturbanceVEG 1324.4 Cliff and Canyon 0.52 Acres Operation DisturbanceVEG 1324.4 Conifer Forest 6.51 Acres Construction DisturbanceVEG 1324.4 Conifer Forest 1.95 Acres Operation DisturbanceVEG 1324.4 Deciduous Forest 4.86 Acres Construction DisturbanceVEG 1324.4 Deciduous Forest 1.24 Acres Operation Disturbance

Page 328: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

VEG 1324.4 Developed/Disturbed 2.80 Acres Construction DisturbanceVEG 1324.4 Developed/Disturbed 0.83 Acres Operation DisturbanceVEG 1324.4 Grassland 0.08 Acres Construction DisturbanceVEG 1324.4 Grassland 0.05 Acres Operation DisturbanceVEG 1324.4 Herbaceous Wetland 1.04 Acres Construction DisturbanceVEG 1324.4 Herbaceous Wetland 0.29 Acres Operation DisturbanceVEG 1324.4 Montane Grassland 1.21 Acres Construction DisturbanceVEG 1324.4 Montane Grassland 0.37 Acres Operation DisturbanceVEG 1324.4 Montane Shrubland 1.40 Acres Construction DisturbanceVEG 1324.4 Montane Shrubland 0.79 Acres Operation DisturbanceVEG 1324.4 Sagebrush Shrubland 35.52 Acres Construction DisturbanceVEG 1324.4 Sagebrush Shrubland 11.51 Acres Operation DisturbanceVEG 1324.4 Woody Riparian and Wetlands 0.16 Acres Construction DisturbanceVEG 1324.4 Woody Riparian and Wetlands 0.06 Acres Operation DisturbanceVEG 1325 Aspen Forest and Woodland 14.73 Acres Construction DisturbanceVEG 1325 Aspen Forest and Woodland 5.71 Acres Operation DisturbanceVEG 1325 Cliff and Canyon 1.16 Acres Construction DisturbanceVEG 1325 Cliff and Canyon 0.45 Acres Operation DisturbanceVEG 1325 Conifer Forest 10.76 Acres Construction DisturbanceVEG 1325 Conifer Forest 4.13 Acres Operation DisturbanceVEG 1325 Deciduous Forest 2.17 Acres Construction DisturbanceVEG 1325 Deciduous Forest 0.82 Acres Operation DisturbanceVEG 1325 Developed/Disturbed 7.19 Acres Construction DisturbanceVEG 1325 Developed/Disturbed 2.93 Acres Operation DisturbanceVEG 1325 Grassland 0.13 Acres Construction DisturbanceVEG 1325 Grassland 0.05 Acres Operation DisturbanceVEG 1325 Montane Grassland 2.49 Acres Construction DisturbanceVEG 1325 Montane Grassland 1.01 Acres Operation DisturbanceVEG 1325 Montane Shrubland 30.22 Acres Construction DisturbanceVEG 1325 Montane Shrubland 11.73 Acres Operation DisturbanceVEG 1325 Pinyon-Juniper 41.26 Acres Construction DisturbanceVEG 1325 Pinyon-Juniper 18.00 Acres Operation DisturbanceVEG 1325 Sagebrush Shrubland 47.30 Acres Construction DisturbanceVEG 1325 Sagebrush Shrubland 18.99 Acres Operation DisturbanceVEG 1325 Woody Riparian and Wetlands 1.37 Acres Construction DisturbanceVEG 1325 Woody Riparian and Wetlands 0.52 Acres Operation DisturbanceVEG 1325.1 Agriculture 70.27 Acres Construction DisturbanceVEG 1325.1 Agriculture 17.88 Acres Operation DisturbanceVEG 1325.1 Aspen Forest and Woodland 31.35 Acres Construction DisturbanceVEG 1325.1 Aspen Forest and Woodland 4.84 Acres Operation DisturbanceVEG 1325.1 Barren/Sparsely Vegetated 4.65 Acres Construction DisturbanceVEG 1325.1 Barren/Sparsely Vegetated 1.18 Acres Operation DisturbanceVEG 1325.1 Cliff and Canyon 27.12 Acres Construction DisturbanceVEG 1325.1 Cliff and Canyon 6.02 Acres Operation DisturbanceVEG 1325.1 Conifer Forest 57.28 Acres Construction Disturbance

Page 329: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

VEG 1325.1 Conifer Forest 8.93 Acres Operation DisturbanceVEG 1325.1 Developed/Disturbed 20.39 Acres Construction DisturbanceVEG 1325.1 Developed/Disturbed 4.27 Acres Operation DisturbanceVEG 1325.1 Grassland 7.99 Acres Construction DisturbanceVEG 1325.1 Grassland 2.09 Acres Operation DisturbanceVEG 1325.1 Greasewood Flat 35.45 Acres Construction DisturbanceVEG 1325.1 Greasewood Flat 7.82 Acres Operation DisturbanceVEG 1325.1 Herbaceous Wetland 13.69 Acres Construction DisturbanceVEG 1325.1 Herbaceous Wetland 2.79 Acres Operation DisturbanceVEG 1325.1 Montane Grassland 11.27 Acres Construction DisturbanceVEG 1325.1 Montane Grassland 1.69 Acres Operation DisturbanceVEG 1325.1 Montane Shrubland 1.32 Acres Construction DisturbanceVEG 1325.1 Montane Shrubland 0.20 Acres Operation DisturbanceVEG 1325.1 Open Water 1.38 Acres Construction DisturbanceVEG 1325.1 Open Water 0.49 Acres Operation DisturbanceVEG 1325.1 Pinyon-Juniper 179.49 Acres Construction DisturbanceVEG 1325.1 Pinyon-Juniper 33.69 Acres Operation DisturbanceVEG 1325.1 Sagebrush Shrubland 142.77 Acres Construction DisturbanceVEG 1325.1 Sagebrush Shrubland 34.49 Acres Operation DisturbanceVEG 1325.1 Saltbush Shrubland 54.98 Acres Construction DisturbanceVEG 1325.1 Saltbush Shrubland 13.08 Acres Operation DisturbanceVEG 1325.1 Woody Riparian and Wetlands 6.22 Acres Construction DisturbanceVEG 1325.1 Woody Riparian and Wetlands 1.46 Acres Operation DisturbanceVEG 1325.2 Aspen Forest and Woodland 12.08 Acres Construction DisturbanceVEG 1325.2 Aspen Forest and Woodland 4.31 Acres Operation DisturbanceVEG 1325.2 Cliff and Canyon 4.23 Acres Construction DisturbanceVEG 1325.2 Cliff and Canyon 1.75 Acres Operation DisturbanceVEG 1325.2 Conifer Forest 8.92 Acres Construction DisturbanceVEG 1325.2 Conifer Forest 3.07 Acres Operation DisturbanceVEG 1325.2 Developed/Disturbed 0.77 Acres Construction DisturbanceVEG 1325.2 Developed/Disturbed 0.28 Acres Operation DisturbanceVEG 1325.2 Montane Grassland 1.01 Acres Construction DisturbanceVEG 1325.2 Montane Grassland 0.37 Acres Operation DisturbanceVEG 1325.2 Montane Shrubland 5.22 Acres Construction DisturbanceVEG 1325.2 Montane Shrubland 2.34 Acres Operation DisturbanceVEG 1325.2 Pinyon-Juniper 0.80 Acres Construction DisturbanceVEG 1325.2 Pinyon-Juniper 0.35 Acres Operation DisturbanceVEG 1325.2 Sagebrush Shrubland 44.96 Acres Construction DisturbanceVEG 1325.2 Sagebrush Shrubland 16.73 Acres Operation DisturbanceVEG 1330.1 Agriculture 160.59 Acres Construction DisturbanceVEG 1330.1 Agriculture 40.32 Acres Operation DisturbanceVEG 1330.1 Aspen Forest and Woodland 22.69 Acres Construction DisturbanceVEG 1330.1 Aspen Forest and Woodland 5.61 Acres Operation DisturbanceVEG 1330.1 Barren/Sparsely Vegetated 29.02 Acres Construction DisturbanceVEG 1330.1 Barren/Sparsely Vegetated 8.12 Acres Operation Disturbance

Page 330: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

VEG 1330.1 Cliff and Canyon 53.15 Acres Construction DisturbanceVEG 1330.1 Cliff and Canyon 14.28 Acres Operation DisturbanceVEG 1330.1 Conifer Forest 22.53 Acres Construction DisturbanceVEG 1330.1 Conifer Forest 5.31 Acres Operation DisturbanceVEG 1330.1 Desert Shrub 0.01 Acres Construction DisturbanceVEG 1330.1 Desert Shrub 0.00 Acres Operation DisturbanceVEG 1330.1 Developed/Disturbed 49.53 Acres Construction DisturbanceVEG 1330.1 Developed/Disturbed 14.78 Acres Operation DisturbanceVEG 1330.1 Grassland 14.92 Acres Construction DisturbanceVEG 1330.1 Grassland 4.61 Acres Operation DisturbanceVEG 1330.1 Greasewood Flat 50.16 Acres Construction DisturbanceVEG 1330.1 Greasewood Flat 13.71 Acres Operation DisturbanceVEG 1330.1 Herbaceous Wetland 0.13 Acres Construction DisturbanceVEG 1330.1 Herbaceous Wetland 0.07 Acres Operation DisturbanceVEG 1330.1 Montane Grassland 0.72 Acres Construction DisturbanceVEG 1330.1 Montane Grassland 0.26 Acres Operation DisturbanceVEG 1330.1 Montane Shrubland 136.10 Acres Construction DisturbanceVEG 1330.1 Montane Shrubland 29.81 Acres Operation DisturbanceVEG 1330.1 Open Water 1.17 Acres Construction DisturbanceVEG 1330.1 Open Water 0.27 Acres Operation DisturbanceVEG 1330.1 Pinyon-Juniper 278.17 Acres Construction DisturbanceVEG 1330.1 Pinyon-Juniper 77.06 Acres Operation DisturbanceVEG 1330.1 Sagebrush Shrubland 313.68 Acres Construction DisturbanceVEG 1330.1 Sagebrush Shrubland 79.74 Acres Operation DisturbanceVEG 1330.1 Saltbush Shrubland 238.87 Acres Construction DisturbanceVEG 1330.1 Saltbush Shrubland 60.07 Acres Operation DisturbanceVEG 1330.1 Woody Riparian and Wetlands 20.15 Acres Construction DisturbanceVEG 1330.1 Woody Riparian and Wetlands 5.27 Acres Operation DisturbanceVEG 1340 Agriculture 81.80 Acres Construction DisturbanceVEG 1340 Agriculture 19.25 Acres Operation DisturbanceVEG 1340 Aspen Forest and Woodland 0.38 Acres Construction DisturbanceVEG 1340 Aspen Forest and Woodland 0.06 Acres Operation DisturbanceVEG 1340 Barren/Sparsely Vegetated 0.02 Acres Construction DisturbanceVEG 1340 Barren/Sparsely Vegetated 0.00 Acres Operation DisturbanceVEG 1340 Cliff and Canyon 0.07 Acres Construction DisturbanceVEG 1340 Cliff and Canyon 0.00 Acres Operation DisturbanceVEG 1340 Conifer Forest 0.09 Acres Construction DisturbanceVEG 1340 Conifer Forest 0.03 Acres Operation DisturbanceVEG 1340 Deciduous Forest 0.16 Acres Construction DisturbanceVEG 1340 Deciduous Forest 0.04 Acres Operation DisturbanceVEG 1340 Developed/Disturbed 28.24 Acres Construction DisturbanceVEG 1340 Developed/Disturbed 5.51 Acres Operation DisturbanceVEG 1340 Grassland 37.76 Acres Construction DisturbanceVEG 1340 Grassland 6.17 Acres Operation DisturbanceVEG 1340 Greasewood Flat 4.37 Acres Construction Disturbance

Page 331: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

VEG 1340 Greasewood Flat 0.86 Acres Operation DisturbanceVEG 1340 Herbaceous Wetland 0.04 Acres Construction DisturbanceVEG 1340 Herbaceous Wetland 0.01 Acres Operation DisturbanceVEG 1340 Montane Grassland 1.99 Acres Construction DisturbanceVEG 1340 Montane Grassland 0.41 Acres Operation DisturbanceVEG 1340 Montane Shrubland 15.50 Acres Construction DisturbanceVEG 1340 Montane Shrubland 2.44 Acres Operation DisturbanceVEG 1340 Open Water 0.34 Acres Construction DisturbanceVEG 1340 Open Water 0.17 Acres Operation DisturbanceVEG 1340 Pinyon-Juniper 57.90 Acres Construction DisturbanceVEG 1340 Pinyon-Juniper 11.40 Acres Operation DisturbanceVEG 1340 Sagebrush Shrubland 61.41 Acres Construction DisturbanceVEG 1340 Sagebrush Shrubland 10.89 Acres Operation DisturbanceVEG 1340 Saltbush Shrubland 2.64 Acres Construction DisturbanceVEG 1340 Saltbush Shrubland 0.37 Acres Operation DisturbanceVEG 1340 Woody Riparian and Wetlands 2.12 Acres Construction DisturbanceVEG 1340 Woody Riparian and Wetlands 0.30 Acres Operation DisturbanceVEG 1350 Agriculture 33.74 Acres Construction DisturbanceVEG 1350 Agriculture 14.35 Acres Operation DisturbanceVEG 1350 Aspen Forest and Woodland 0.28 Acres Construction DisturbanceVEG 1350 Aspen Forest and Woodland 0.13 Acres Operation DisturbanceVEG 1350 Barren/Sparsely Vegetated 0.72 Acres Construction DisturbanceVEG 1350 Barren/Sparsely Vegetated 0.22 Acres Operation DisturbanceVEG 1350 Cliff and Canyon 1.01 Acres Construction DisturbanceVEG 1350 Cliff and Canyon 0.31 Acres Operation DisturbanceVEG 1350 Conifer Forest 0.92 Acres Construction DisturbanceVEG 1350 Conifer Forest 0.38 Acres Operation DisturbanceVEG 1350 Deciduous Forest 0.04 Acres Construction DisturbanceVEG 1350 Deciduous Forest 0.02 Acres Operation DisturbanceVEG 1350 Developed/Disturbed 12.74 Acres Construction DisturbanceVEG 1350 Developed/Disturbed 5.32 Acres Operation DisturbanceVEG 1350 Grassland 8.17 Acres Construction DisturbanceVEG 1350 Grassland 3.08 Acres Operation DisturbanceVEG 1350 Greasewood Flat 3.11 Acres Construction DisturbanceVEG 1350 Greasewood Flat 1.20 Acres Operation DisturbanceVEG 1350 Montane Grassland 0.40 Acres Construction DisturbanceVEG 1350 Montane Grassland 0.11 Acres Operation DisturbanceVEG 1350 Montane Shrubland 27.00 Acres Construction DisturbanceVEG 1350 Montane Shrubland 9.53 Acres Operation DisturbanceVEG 1350 Pinyon-Juniper 126.61 Acres Construction DisturbanceVEG 1350 Pinyon-Juniper 42.49 Acres Operation DisturbanceVEG 1350 Sagebrush Shrubland 24.72 Acres Construction DisturbanceVEG 1350 Sagebrush Shrubland 8.85 Acres Operation DisturbanceVEG 1350 Saltbush Shrubland 1.71 Acres Construction DisturbanceVEG 1350 Saltbush Shrubland 0.58 Acres Operation Disturbance

Page 332: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

VEG 1350 Woody Riparian and Wetlands 3.03 Acres Construction DisturbanceVEG 1350 Woody Riparian and Wetlands 0.96 Acres Operation DisturbanceVEG 1360 Agriculture 24.18 Acres Construction DisturbanceVEG 1360 Agriculture 4.91 Acres Operation DisturbanceVEG 1360 Developed/Disturbed 13.89 Acres Construction DisturbanceVEG 1360 Developed/Disturbed 3.14 Acres Operation DisturbanceVEG 1360 Dunes 0.11 Acres Construction DisturbanceVEG 1360 Dunes 0.04 Acres Operation DisturbanceVEG 1360 Grassland 46.59 Acres Construction DisturbanceVEG 1360 Grassland 46.59 Acres Construction DisturbanceVEG 1360 Grassland 12.20 Acres Operation DisturbanceVEG 1360 Grassland 12.20 Acres Operation DisturbanceVEG 1360 Greasewood Flat 9.79 Acres Construction DisturbanceVEG 1360 Greasewood Flat 3.05 Acres Operation DisturbanceVEG 1360 Herbaceous Wetland 0.01 Acres Construction DisturbanceVEG 1360 Herbaceous Wetland 0.00 Acres Operation DisturbanceVEG 1360 Montane Grassland 0.73 Acres Construction DisturbanceVEG 1360 Montane Grassland 0.17 Acres Operation DisturbanceVEG 1360 Montane Shrubland 0.01 Acres Construction DisturbanceVEG 1360 Montane Shrubland 0.00 Acres Operation DisturbanceVEG 1360 Open Water 0.01 Acres Construction DisturbanceVEG 1360 Open Water 0.00 Acres Operation DisturbanceVEG 1360 Pinyon-Juniper 62.71 Acres Construction DisturbanceVEG 1360 Pinyon-Juniper 13.84 Acres Operation DisturbanceVEG 1360 Sagebrush Shrubland 170.29 Acres Construction DisturbanceVEG 1360 Sagebrush Shrubland 36.39 Acres Operation DisturbanceVEG 1360 Saltbush Shrubland 50.64 Acres Construction DisturbanceVEG 1360 Saltbush Shrubland 13.40 Acres Operation DisturbanceVEG 1370 Agriculture 10.81 Acres Construction DisturbanceVEG 1370 Agriculture 2.35 Acres Operation DisturbanceVEG 1370 Developed/Disturbed 4.88 Acres Construction DisturbanceVEG 1370 Developed/Disturbed 1.09 Acres Operation DisturbanceVEG 1370 Grassland 11.83 Acres Construction DisturbanceVEG 1370 Grassland 3.26 Acres Operation DisturbanceVEG 1370 Greasewood Flat 0.51 Acres Construction DisturbanceVEG 1370 Greasewood Flat 0.11 Acres Operation DisturbanceVEG 1370 Montane Grassland 1.06 Acres Construction DisturbanceVEG 1370 Montane Grassland 0.22 Acres Operation DisturbanceVEG 1370 Montane Shrubland 0.02 Acres Construction DisturbanceVEG 1370 Montane Shrubland 0.01 Acres Operation DisturbanceVEG 1370 Open Water 0.50 Acres Construction DisturbanceVEG 1370 Open Water 0.11 Acres Operation DisturbanceVEG 1370 Pinyon-Juniper 46.46 Acres Construction DisturbanceVEG 1370 Pinyon-Juniper 10.63 Acres Operation DisturbanceVEG 1370 Sagebrush Shrubland 116.70 Acres Construction Disturbance

Page 333: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

VEG 1370 Sagebrush Shrubland 27.09 Acres Operation DisturbanceVEG 1370 Saltbush Shrubland 0.67 Acres Construction DisturbanceVEG 1370 Saltbush Shrubland 0.13 Acres Operation DisturbanceVEG 1370 Woody Riparian and Wetlands 0.17 Acres Construction DisturbanceVEG 1370 Woody Riparian and Wetlands 0.03 Acres Operation DisturbanceVEG 1380 Agriculture 13.93 Acres Construction DisturbanceVEG 1380 Agriculture 2.66 Acres Operation DisturbanceVEG 1380 Deciduous Forest 0.00 Acres Construction DisturbanceVEG 1380 Deciduous Forest 0.00 Acres Operation DisturbanceVEG 1380 Developed/Disturbed 15.71 Acres Construction DisturbanceVEG 1380 Developed/Disturbed 2.00 Acres Operation DisturbanceVEG 1380 Grassland 39.77 Acres Construction DisturbanceVEG 1380 Grassland 6.87 Acres Operation DisturbanceVEG 1380 Greasewood Flat 40.49 Acres Construction DisturbanceVEG 1380 Greasewood Flat 5.90 Acres Operation DisturbanceVEG 1380 Herbaceous Wetland 0.01 Acres Construction DisturbanceVEG 1380 Herbaceous Wetland 0.00 Acres Operation DisturbanceVEG 1380 Montane Grassland 2.63 Acres Construction DisturbanceVEG 1380 Montane Grassland 0.81 Acres Operation DisturbanceVEG 1380 Montane Shrubland 0.17 Acres Construction DisturbanceVEG 1380 Montane Shrubland 0.02 Acres Operation DisturbanceVEG 1380 Open Water 1.55 Acres Construction DisturbanceVEG 1380 Open Water 0.22 Acres Operation DisturbanceVEG 1380 Pinyon-Juniper 9.28 Acres Construction DisturbanceVEG 1380 Pinyon-Juniper 2.39 Acres Operation DisturbanceVEG 1380 Sagebrush Shrubland 18.04 Acres Construction DisturbanceVEG 1380 Sagebrush Shrubland 3.07 Acres Operation DisturbanceVEG 1380 Saltbush Shrubland 12.69 Acres Construction DisturbanceVEG 1380 Saltbush Shrubland 1.79 Acres Operation DisturbanceVEG 1380 Woody Riparian and Wetlands 1.30 Acres Construction DisturbanceVEG 1380 Woody Riparian and Wetlands 0.23 Acres Operation DisturbanceVEG 1390 Developed/Disturbed 8.78 Acres Construction DisturbanceVEG 1390 Developed/Disturbed 1.46 Acres Operation DisturbanceVEG 1390 Grassland 5.82 Acres Construction DisturbanceVEG 1390 Grassland 0.97 Acres Operation DisturbanceVEG 1390 Greasewood Flat 18.47 Acres Construction DisturbanceVEG 1390 Greasewood Flat 3.05 Acres Operation DisturbanceVEG 1390 Pinyon-Juniper 0.03 Acres Construction DisturbanceVEG 1390 Pinyon-Juniper 0.01 Acres Operation DisturbanceVEG 1390 Sagebrush Shrubland 0.02 Acres Construction DisturbanceVEG 1390 Sagebrush Shrubland 0.00 Acres Operation DisturbanceVEG 1390 Saltbush Shrubland 20.08 Acres Construction DisturbanceVEG 1390 Saltbush Shrubland 3.31 Acres Operation DisturbanceVEG 1400 Agriculture 4.37 Acres Construction DisturbanceVEG 1400 Agriculture 1.25 Acres Operation Disturbance

Page 334: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

VEG 1400 Cliff and Canyon 0.02 Acres Construction DisturbanceVEG 1400 Cliff and Canyon 0.00 Acres Operation DisturbanceVEG 1400 Developed/Disturbed 9.00 Acres Construction DisturbanceVEG 1400 Developed/Disturbed 1.98 Acres Operation DisturbanceVEG 1400 Grassland 69.81 Acres Construction DisturbanceVEG 1400 Grassland 15.42 Acres Operation DisturbanceVEG 1400 Greasewood Flat 0.67 Acres Construction DisturbanceVEG 1400 Greasewood Flat 0.15 Acres Operation DisturbanceVEG 1400 Montane Grassland 12.82 Acres Construction DisturbanceVEG 1400 Montane Grassland 3.07 Acres Operation DisturbanceVEG 1400 Montane Shrubland 0.30 Acres Construction DisturbanceVEG 1400 Montane Shrubland 0.08 Acres Operation DisturbanceVEG 1400 Open Water 0.01 Acres Construction DisturbanceVEG 1400 Open Water 0.00 Acres Operation DisturbanceVEG 1400 Pinyon-Juniper 44.37 Acres Construction DisturbanceVEG 1400 Pinyon-Juniper 9.96 Acres Operation DisturbanceVEG 1400 Sagebrush Shrubland 162.88 Acres Construction DisturbanceVEG 1400 Sagebrush Shrubland 35.28 Acres Operation DisturbanceVEG 1400 Saltbush Shrubland 1.91 Acres Construction DisturbanceVEG 1400 Saltbush Shrubland 0.47 Acres Operation DisturbanceVEG 1400 Woody Riparian and Wetlands 0.01 Acres Construction DisturbanceVEG 1400 Woody Riparian and Wetlands 0.00 Acres Operation DisturbanceVEG 1410 Agriculture 17.45 Acres Construction DisturbanceVEG 1410 Agriculture 3.65 Acres Operation DisturbanceVEG 1410 Barren/Sparsely Vegetated 4.87 Acres Construction DisturbanceVEG 1410 Barren/Sparsely Vegetated 1.20 Acres Operation DisturbanceVEG 1410 Cliff and Canyon 0.20 Acres Construction DisturbanceVEG 1410 Cliff and Canyon 0.04 Acres Operation DisturbanceVEG 1410 Deciduous Forest 0.00 Acres Construction DisturbanceVEG 1410 Deciduous Forest 0.00 Acres Operation DisturbanceVEG 1410 Developed/Disturbed 22.79 Acres Construction DisturbanceVEG 1410 Developed/Disturbed 4.56 Acres Operation DisturbanceVEG 1410 Grassland 105.25 Acres Construction DisturbanceVEG 1410 Grassland 21.00 Acres Operation DisturbanceVEG 1410 Greasewood Flat 74.17 Acres Construction DisturbanceVEG 1410 Greasewood Flat 16.81 Acres Operation DisturbanceVEG 1410 Herbaceous Wetland 1.14 Acres Construction DisturbanceVEG 1410 Herbaceous Wetland 0.43 Acres Operation DisturbanceVEG 1410 Montane Grassland 0.99 Acres Construction DisturbanceVEG 1410 Montane Grassland 0.18 Acres Operation DisturbanceVEG 1410 Montane Shrubland 20.04 Acres Construction DisturbanceVEG 1410 Montane Shrubland 3.20 Acres Operation DisturbanceVEG 1410 Open Water 3.40 Acres Construction DisturbanceVEG 1410 Open Water 0.96 Acres Operation DisturbanceVEG 1410 Pinyon-Juniper 107.20 Acres Construction Disturbance

Page 335: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

VEG 1410 Pinyon-Juniper 19.28 Acres Operation DisturbanceVEG 1410 Sagebrush Shrubland 71.42 Acres Construction DisturbanceVEG 1410 Sagebrush Shrubland 13.38 Acres Operation DisturbanceVEG 1410 Saltbush Shrubland 63.85 Acres Construction DisturbanceVEG 1410 Saltbush Shrubland 15.90 Acres Operation DisturbanceVEG 1410 Woody Riparian and Wetlands 0.57 Acres Construction DisturbanceVEG 1410 Woody Riparian and Wetlands 0.13 Acres Operation DisturbanceVEG 1420 Developed/Disturbed 1.68 Acres Construction DisturbanceVEG 1420 Developed/Disturbed 0.23 Acres Operation DisturbanceVEG 1420 Grassland 27.92 Acres Construction DisturbanceVEG 1420 Grassland 4.54 Acres Operation DisturbanceVEG 1420 Greasewood Flat 28.16 Acres Construction DisturbanceVEG 1420 Greasewood Flat 3.75 Acres Operation DisturbanceVEG 1420 Open Water 0.06 Acres Construction DisturbanceVEG 1420 Open Water 0.02 Acres Operation DisturbanceVEG 1420 Sagebrush Shrubland 0.12 Acres Construction DisturbanceVEG 1420 Sagebrush Shrubland 0.01 Acres Operation DisturbanceVEG 1420 Saltbush Shrubland 31.99 Acres Construction DisturbanceVEG 1420 Saltbush Shrubland 4.48 Acres Operation DisturbanceVEG 1430 Cliff and Canyon 0.34 Acres Construction DisturbanceVEG 1430 Cliff and Canyon 0.07 Acres Operation DisturbanceVEG 1430 Developed/Disturbed 2.19 Acres Construction DisturbanceVEG 1430 Developed/Disturbed 0.45 Acres Operation DisturbanceVEG 1430 Grassland 71.58 Acres Construction DisturbanceVEG 1430 Grassland 14.39 Acres Operation DisturbanceVEG 1430 Greasewood Flat 94.22 Acres Construction DisturbanceVEG 1430 Greasewood Flat 18.89 Acres Operation DisturbanceVEG 1430 Herbaceous Wetland 8.11 Acres Construction DisturbanceVEG 1430 Herbaceous Wetland 1.64 Acres Operation DisturbanceVEG 1430 Open Water 0.61 Acres Construction DisturbanceVEG 1430 Open Water 0.13 Acres Operation DisturbanceVEG 1430 Sagebrush Shrubland 0.24 Acres Construction DisturbanceVEG 1430 Sagebrush Shrubland 0.05 Acres Operation DisturbanceVEG 1430 Saltbush Shrubland 43.76 Acres Construction DisturbanceVEG 1430 Saltbush Shrubland 8.78 Acres Operation DisturbanceVEG 1430 Woody Riparian and Wetlands 1.09 Acres Construction DisturbanceVEG 1430 Woody Riparian and Wetlands 0.22 Acres Operation DisturbanceVEG 1440 Agriculture 1.12 Acres Construction DisturbanceVEG 1440 Agriculture 0.41 Acres Operation DisturbanceVEG 1440 Developed/Disturbed 9.21 Acres Construction DisturbanceVEG 1440 Developed/Disturbed 2.08 Acres Operation DisturbanceVEG 1440 Grassland 3.80 Acres Construction DisturbanceVEG 1440 Grassland 0.50 Acres Operation DisturbanceVEG 1440 Greasewood Flat 79.18 Acres Construction DisturbanceVEG 1440 Greasewood Flat 9.43 Acres Operation Disturbance

Page 336: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

VEG 1440 Herbaceous Wetland 3.39 Acres Construction DisturbanceVEG 1440 Herbaceous Wetland 0.53 Acres Operation DisturbanceVEG 1440 Open Water 0.49 Acres Construction DisturbanceVEG 1440 Open Water 0.18 Acres Operation DisturbanceVEG 1440 Sagebrush Shrubland 0.05 Acres Construction DisturbanceVEG 1440 Sagebrush Shrubland 0.01 Acres Operation DisturbanceVEG 1440 Saltbush Shrubland 21.38 Acres Construction DisturbanceVEG 1440 Saltbush Shrubland 2.45 Acres Operation DisturbanceVEG 1440 Woody Riparian and Wetlands 0.20 Acres Construction DisturbanceVEG 1440 Woody Riparian and Wetlands 0.07 Acres Operation DisturbanceVEG 1450 Cliff and Canyon 0.03 Acres Construction DisturbanceVEG 1450 Cliff and Canyon 0.01 Acres Operation DisturbanceVEG 1450 Developed/Disturbed 2.57 Acres Construction DisturbanceVEG 1450 Developed/Disturbed 0.19 Acres Operation DisturbanceVEG 1450 Grassland 0.62 Acres Construction DisturbanceVEG 1450 Grassland 0.19 Acres Operation DisturbanceVEG 1450 Greasewood Flat 54.45 Acres Construction DisturbanceVEG 1450 Greasewood Flat 6.76 Acres Operation DisturbanceVEG 1450 Herbaceous Wetland 25.61 Acres Construction DisturbanceVEG 1450 Herbaceous Wetland 2.58 Acres Operation DisturbanceVEG 1450 Sagebrush Shrubland 0.00 Acres Construction DisturbanceVEG 1450 Sagebrush Shrubland 0.00 Acres Operation DisturbanceVEG 1450 Saltbush Shrubland 9.11 Acres Construction DisturbanceVEG 1450 Saltbush Shrubland 1.82 Acres Operation DisturbanceVEG 1460 Cliff and Canyon 0.03 Acres Construction DisturbanceVEG 1460 Cliff and Canyon 0.01 Acres Operation DisturbanceVEG 1460 Developed/Disturbed 13.53 Acres Construction DisturbanceVEG 1460 Developed/Disturbed 1.67 Acres Operation DisturbanceVEG 1460 Grassland 86.11 Acres Construction DisturbanceVEG 1460 Grassland 12.40 Acres Operation DisturbanceVEG 1460 Greasewood Flat 163.03 Acres Construction DisturbanceVEG 1460 Greasewood Flat 25.53 Acres Operation DisturbanceVEG 1460 Herbaceous Wetland 15.45 Acres Construction DisturbanceVEG 1460 Herbaceous Wetland 3.23 Acres Operation DisturbanceVEG 1460 Montane Grassland 0.03 Acres Construction DisturbanceVEG 1460 Montane Grassland 0.01 Acres Operation DisturbanceVEG 1460 Open Water 0.78 Acres Construction DisturbanceVEG 1460 Open Water 0.05 Acres Operation DisturbanceVEG 1460 Pinyon-Juniper 0.13 Acres Construction DisturbanceVEG 1460 Pinyon-Juniper 0.05 Acres Operation DisturbanceVEG 1460 Sagebrush Shrubland 12.32 Acres Construction DisturbanceVEG 1460 Sagebrush Shrubland 3.27 Acres Operation DisturbanceVEG 1460 Saltbush Shrubland 114.29 Acres Construction DisturbanceVEG 1460 Saltbush Shrubland 18.54 Acres Operation DisturbanceVEG 1460 Woody Riparian and Wetlands 4.07 Acres Construction Disturbance

Page 337: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

VEG 1460 Woody Riparian and Wetlands 0.97 Acres Operation DisturbanceVEG 1470 Cliff and Canyon 0.93 Acres Construction DisturbanceVEG 1470 Cliff and Canyon 0.19 Acres Operation DisturbanceVEG 1470 Developed/Disturbed 9.01 Acres Construction DisturbanceVEG 1470 Developed/Disturbed 1.87 Acres Operation DisturbanceVEG 1470 Grassland 168.86 Acres Construction DisturbanceVEG 1470 Grassland 35.64 Acres Operation DisturbanceVEG 1470 Greasewood Flat 114.11 Acres Construction DisturbanceVEG 1470 Greasewood Flat 23.83 Acres Operation DisturbanceVEG 1470 Herbaceous Wetland 28.39 Acres Construction DisturbanceVEG 1470 Herbaceous Wetland 5.90 Acres Operation DisturbanceVEG 1470 Montane Grassland 0.01 Acres Construction DisturbanceVEG 1470 Montane Grassland 0.00 Acres Operation DisturbanceVEG 1470 Montane Shrubland 0.00 Acres Construction DisturbanceVEG 1470 Montane Shrubland 0.00 Acres Operation DisturbanceVEG 1470 Open Water 1.54 Acres Construction DisturbanceVEG 1470 Open Water 0.32 Acres Operation DisturbanceVEG 1470 Pinyon-Juniper 0.09 Acres Construction DisturbanceVEG 1470 Pinyon-Juniper 0.02 Acres Operation DisturbanceVEG 1470 Sagebrush Shrubland 30.10 Acres Construction DisturbanceVEG 1470 Sagebrush Shrubland 6.33 Acres Operation DisturbanceVEG 1470 Saltbush Shrubland 112.47 Acres Construction DisturbanceVEG 1470 Saltbush Shrubland 23.73 Acres Operation DisturbanceVEG 1470 Woody Riparian and Wetlands 4.13 Acres Construction DisturbanceVEG 1470 Woody Riparian and Wetlands 0.87 Acres Operation DisturbanceVEG 1480 Cliff and Canyon 0.98 Acres Construction DisturbanceVEG 1480 Cliff and Canyon 0.27 Acres Operation DisturbanceVEG 1480 Developed/Disturbed 30.12 Acres Construction DisturbanceVEG 1480 Developed/Disturbed 5.18 Acres Operation DisturbanceVEG 1480 Grassland 287.26 Acres Construction DisturbanceVEG 1480 Grassland 50.61 Acres Operation DisturbanceVEG 1480 Greasewood Flat 35.54 Acres Construction DisturbanceVEG 1480 Greasewood Flat 4.59 Acres Operation DisturbanceVEG 1480 Herbaceous Wetland 0.88 Acres Construction DisturbanceVEG 1480 Herbaceous Wetland 0.10 Acres Operation DisturbanceVEG 1480 Montane Grassland 0.50 Acres Construction DisturbanceVEG 1480 Montane Grassland 0.13 Acres Operation DisturbanceVEG 1480 Open Water 0.12 Acres Construction DisturbanceVEG 1480 Open Water 0.01 Acres Operation DisturbanceVEG 1480 Pinyon-Juniper 6.69 Acres Construction DisturbanceVEG 1480 Pinyon-Juniper 1.01 Acres Operation DisturbanceVEG 1480 Sagebrush Shrubland 188.80 Acres Construction DisturbanceVEG 1480 Sagebrush Shrubland 33.35 Acres Operation DisturbanceVEG 1480 Saltbush Shrubland 212.56 Acres Construction DisturbanceVEG 1480 Saltbush Shrubland 34.06 Acres Operation Disturbance

Page 338: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

VEG 1490 Developed/Disturbed 2.06 Acres Construction DisturbanceVEG 1490 Developed/Disturbed 0.42 Acres Operation DisturbanceVEG 1490 Grassland 51.20 Acres Construction DisturbanceVEG 1490 Grassland 10.49 Acres Operation DisturbanceVEG 1490 Greasewood Flat 13.12 Acres Construction DisturbanceVEG 1490 Greasewood Flat 2.69 Acres Operation DisturbanceVEG 1490 Herbaceous Wetland 10.63 Acres Construction DisturbanceVEG 1490 Herbaceous Wetland 2.18 Acres Operation DisturbanceVEG 1490 Pinyon-Juniper 0.00 Acres Construction DisturbanceVEG 1490 Pinyon-Juniper 0.00 Acres Operation DisturbanceVEG 1490 Sagebrush Shrubland 24.34 Acres Construction DisturbanceVEG 1490 Sagebrush Shrubland 4.98 Acres Operation DisturbanceVEG 1490 Saltbush Shrubland 65.01 Acres Construction DisturbanceVEG 1490 Saltbush Shrubland 13.31 Acres Operation DisturbanceVEG 1490.05 Agriculture 3.11 Acres Construction DisturbanceVEG 1490.05 Agriculture 0.62 Acres Operation DisturbanceVEG 1490.05 Cliff and Canyon 0.02 Acres Construction DisturbanceVEG 1490.05 Cliff and Canyon 0.00 Acres Operation DisturbanceVEG 1490.05 Deciduous Forest 0.00 Acres Construction DisturbanceVEG 1490.05 Deciduous Forest 0.00 Acres Operation DisturbanceVEG 1490.05 Developed/Disturbed 13.15 Acres Construction DisturbanceVEG 1490.05 Developed/Disturbed 2.61 Acres Operation DisturbanceVEG 1490.05 Dunes 23.36 Acres Construction DisturbanceVEG 1490.05 Dunes 4.53 Acres Operation DisturbanceVEG 1490.05 Grassland 58.88 Acres Construction DisturbanceVEG 1490.05 Grassland 11.38 Acres Operation DisturbanceVEG 1490.05 Greasewood Flat 40.93 Acres Construction DisturbanceVEG 1490.05 Greasewood Flat 7.92 Acres Operation DisturbanceVEG 1490.05 Herbaceous Wetland 1.57 Acres Construction DisturbanceVEG 1490.05 Herbaceous Wetland 0.31 Acres Operation DisturbanceVEG 1490.05 Montane Shrubland 0.13 Acres Construction DisturbanceVEG 1490.05 Montane Shrubland 0.03 Acres Operation DisturbanceVEG 1490.05 Open Water 0.12 Acres Construction DisturbanceVEG 1490.05 Open Water 0.02 Acres Operation DisturbanceVEG 1490.05 Pinyon-Juniper 9.00 Acres Construction DisturbanceVEG 1490.05 Pinyon-Juniper 1.76 Acres Operation DisturbanceVEG 1490.05 Sagebrush Shrubland 265.41 Acres Construction DisturbanceVEG 1490.05 Sagebrush Shrubland 51.47 Acres Operation DisturbanceVEG 1490.05 Saltbush Shrubland 112.58 Acres Construction DisturbanceVEG 1490.05 Saltbush Shrubland 21.84 Acres Operation DisturbanceVEG 1495 Developed/Disturbed 2.95 Acres Construction DisturbanceVEG 1495 Developed/Disturbed 0.55 Acres Operation DisturbanceVEG 1495 Grassland 5.07 Acres Construction DisturbanceVEG 1495 Grassland 0.95 Acres Operation DisturbanceVEG 1495 Greasewood Flat 2.16 Acres Construction Disturbance

Page 339: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

VEG 1495 Greasewood Flat 0.41 Acres Operation DisturbanceVEG 1495 Herbaceous Wetland 0.68 Acres Construction DisturbanceVEG 1495 Herbaceous Wetland 0.13 Acres Operation DisturbanceVEG 1495 Open Water 0.15 Acres Construction DisturbanceVEG 1495 Open Water 0.03 Acres Operation DisturbanceVEG 1495 Sagebrush Shrubland 12.47 Acres Construction DisturbanceVEG 1495 Sagebrush Shrubland 2.36 Acres Operation DisturbanceVEG 1495 Saltbush Shrubland 75.16 Acres Construction DisturbanceVEG 1495 Saltbush Shrubland 14.06 Acres Operation DisturbanceVEG 1500 Cliff and Canyon 0.00 Acres Construction DisturbanceVEG 1500 Cliff and Canyon 0.00 Acres Operation DisturbanceVEG 1500 Developed/Disturbed 6.64 Acres Construction DisturbanceVEG 1500 Developed/Disturbed 0.67 Acres Operation DisturbanceVEG 1500 Grassland 41.50 Acres Construction DisturbanceVEG 1500 Grassland 6.95 Acres Operation DisturbanceVEG 1500 Greasewood Flat 28.81 Acres Construction DisturbanceVEG 1500 Greasewood Flat 3.31 Acres Operation DisturbanceVEG 1500 Herbaceous Wetland 10.68 Acres Construction DisturbanceVEG 1500 Herbaceous Wetland 0.99 Acres Operation DisturbanceVEG 1500 Pinyon-Juniper 0.06 Acres Construction DisturbanceVEG 1500 Pinyon-Juniper 0.02 Acres Operation DisturbanceVEG 1500 Sagebrush Shrubland 32.85 Acres Construction DisturbanceVEG 1500 Sagebrush Shrubland 6.18 Acres Operation DisturbanceVEG 1500 Saltbush Shrubland 101.67 Acres Construction DisturbanceVEG 1500 Saltbush Shrubland 13.60 Acres Operation DisturbanceVEG 1500.02 Agriculture 3.05 Acres Construction DisturbanceVEG 1500.02 Agriculture 0.69 Acres Operation DisturbanceVEG 1500.02 Cliff and Canyon 0.01 Acres Construction DisturbanceVEG 1500.02 Cliff and Canyon 0.00 Acres Operation DisturbanceVEG 1500.02 Deciduous Forest 0.01 Acres Construction DisturbanceVEG 1500.02 Deciduous Forest 0.00 Acres Operation DisturbanceVEG 1500.02 Developed/Disturbed 8.26 Acres Construction DisturbanceVEG 1500.02 Developed/Disturbed 1.05 Acres Operation DisturbanceVEG 1500.02 Grassland 25.32 Acres Construction DisturbanceVEG 1500.02 Grassland 3.02 Acres Operation DisturbanceVEG 1500.02 Greasewood Flat 7.80 Acres Construction DisturbanceVEG 1500.02 Greasewood Flat 1.36 Acres Operation DisturbanceVEG 1500.02 Herbaceous Wetland 0.34 Acres Construction DisturbanceVEG 1500.02 Herbaceous Wetland 0.03 Acres Operation DisturbanceVEG 1500.02 Montane Grassland 0.01 Acres Construction DisturbanceVEG 1500.02 Montane Grassland 0.00 Acres Operation DisturbanceVEG 1500.02 Montane Shrubland 0.07 Acres Construction DisturbanceVEG 1500.02 Montane Shrubland 0.01 Acres Operation DisturbanceVEG 1500.02 Pinyon-Juniper 9.07 Acres Construction DisturbanceVEG 1500.02 Pinyon-Juniper 2.58 Acres Operation Disturbance

Page 340: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

VEG 1500.02 Sagebrush Shrubland 103.77 Acres Construction DisturbanceVEG 1500.02 Sagebrush Shrubland 14.41 Acres Operation DisturbanceVEG 1500.02 Saltbush Shrubland 57.35 Acres Construction DisturbanceVEG 1500.02 Saltbush Shrubland 7.91 Acres Operation DisturbanceVEG 1500.02 Woody Riparian and Wetlands 0.00 Acres Construction DisturbanceVEG 1500.02 Woody Riparian and Wetlands 0.00 Acres Operation DisturbanceVEG 1500.05 Agriculture 0.04 Acres Construction DisturbanceVEG 1500.05 Agriculture 0.03 Acres Operation DisturbanceVEG 1500.05 Cliff and Canyon 0.11 Acres Construction DisturbanceVEG 1500.05 Cliff and Canyon 0.03 Acres Operation DisturbanceVEG 1500.05 Developed/Disturbed 4.35 Acres Construction DisturbanceVEG 1500.05 Developed/Disturbed 1.05 Acres Operation DisturbanceVEG 1500.05 Grassland 0.59 Acres Construction DisturbanceVEG 1500.05 Grassland 0.30 Acres Operation DisturbanceVEG 1500.05 Montane Grassland 0.01 Acres Construction DisturbanceVEG 1500.05 Montane Grassland 0.01 Acres Operation DisturbanceVEG 1500.05 Montane Shrubland 0.00 Acres Construction DisturbanceVEG 1500.05 Montane Shrubland 0.00 Acres Operation DisturbanceVEG 1500.05 Open Water 0.36 Acres Construction DisturbanceVEG 1500.05 Open Water 0.21 Acres Operation DisturbanceVEG 1500.05 Pinyon-Juniper 54.30 Acres Construction DisturbanceVEG 1500.05 Pinyon-Juniper 15.23 Acres Operation DisturbanceVEG 1500.05 Sagebrush Shrubland 93.19 Acres Construction DisturbanceVEG 1500.05 Sagebrush Shrubland 23.79 Acres Operation DisturbanceVEG 1501.1 Desert Shrub 0.75 Acres Construction DisturbanceVEG 1501.1 Desert Shrub 0.17 Acres Operation DisturbanceVEG 1501.1 Developed/Disturbed 6.84 Acres Construction DisturbanceVEG 1501.1 Developed/Disturbed 1.67 Acres Operation DisturbanceVEG 1501.1 Grassland 2.62 Acres Construction DisturbanceVEG 1501.1 Grassland 1.28 Acres Operation DisturbanceVEG 1501.1 Greasewood Flat 0.43 Acres Construction DisturbanceVEG 1501.1 Greasewood Flat 0.15 Acres Operation DisturbanceVEG 1501.1 Herbaceous Wetland 0.89 Acres Construction DisturbanceVEG 1501.1 Herbaceous Wetland 0.30 Acres Operation DisturbanceVEG 1501.1 Montane Shrubland 15.47 Acres Construction DisturbanceVEG 1501.1 Montane Shrubland 3.82 Acres Operation DisturbanceVEG 1501.1 Pinyon-Juniper 95.46 Acres Construction DisturbanceVEG 1501.1 Pinyon-Juniper 23.35 Acres Operation DisturbanceVEG 1501.1 Sagebrush Shrubland 136.27 Acres Construction DisturbanceVEG 1501.1 Sagebrush Shrubland 42.82 Acres Operation DisturbanceVEG 1501.1 Saltbush Shrubland 0.35 Acres Construction DisturbanceVEG 1501.1 Saltbush Shrubland 0.07 Acres Operation DisturbanceVEG 1501.1 Woody Riparian and Wetlands 2.62 Acres Construction DisturbanceVEG 1501.1 Woody Riparian and Wetlands 0.75 Acres Operation DisturbanceVEG 1501.15 Desert Shrub 4.49 Acres Construction Disturbance

Page 341: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

VEG 1501.15 Desert Shrub 0.99 Acres Operation DisturbanceVEG 1501.15 Developed/Disturbed 0.33 Acres Construction DisturbanceVEG 1501.15 Developed/Disturbed 0.09 Acres Operation DisturbanceVEG 1501.15 Herbaceous Wetland 0.07 Acres Construction DisturbanceVEG 1501.15 Herbaceous Wetland 0.02 Acres Operation DisturbanceVEG 1501.15 Pinyon-Juniper 12.89 Acres Construction DisturbanceVEG 1501.15 Pinyon-Juniper 2.86 Acres Operation DisturbanceVEG 1501.15 Sagebrush Shrubland 2.64 Acres Construction DisturbanceVEG 1501.15 Sagebrush Shrubland 0.56 Acres Operation DisturbanceVEG 1501.15 Woody Riparian and Wetlands 0.00 Acres Construction DisturbanceVEG 1501.15 Woody Riparian and Wetlands 0.00 Acres Operation DisturbanceVEG 1502.5 Cliff and Canyon 3.80 Acres Construction DisturbanceVEG 1502.5 Cliff and Canyon 1.32 Acres Operation DisturbanceVEG 1502.5 Desert Shrub 493.47 Acres Construction DisturbanceVEG 1502.5 Desert Shrub 135.65 Acres Operation DisturbanceVEG 1502.5 Developed/Disturbed 3.66 Acres Construction DisturbanceVEG 1502.5 Developed/Disturbed 0.91 Acres Operation DisturbanceVEG 1502.5 Grassland 4.68 Acres Construction DisturbanceVEG 1502.5 Grassland 1.51 Acres Operation DisturbanceVEG 1502.5 Herbaceous Wetland 0.10 Acres Construction DisturbanceVEG 1502.5 Herbaceous Wetland 0.04 Acres Operation DisturbanceVEG 1502.5 Montane Shrubland 1.00 Acres Construction DisturbanceVEG 1502.5 Montane Shrubland 0.14 Acres Operation DisturbanceVEG 1502.5 Pinyon-Juniper 43.98 Acres Construction DisturbanceVEG 1502.5 Pinyon-Juniper 10.53 Acres Operation DisturbanceVEG 1502.5 Riparian 0.34 Acres Construction DisturbanceVEG 1502.5 Riparian 0.14 Acres Operation DisturbanceVEG 1502.5 Sagebrush Shrubland 18.67 Acres Construction DisturbanceVEG 1502.5 Sagebrush Shrubland 4.58 Acres Operation DisturbanceVEG 1502.5 Saltbush Shrubland 5.46 Acres Construction DisturbanceVEG 1502.5 Saltbush Shrubland 1.60 Acres Operation DisturbanceVEG 1502.5 Woody Riparian and Wetlands 0.37 Acres Construction DisturbanceVEG 1502.5 Woody Riparian and Wetlands 0.13 Acres Operation DisturbanceVEG 1503 Aspen Forest and Woodland 0.02 Acres Construction DisturbanceVEG 1503 Aspen Forest and Woodland 0.01 Acres Operation DisturbanceVEG 1503 Desert Shrub 0.00 Acres Construction DisturbanceVEG 1503 Desert Shrub 0.00 Acres Operation DisturbanceVEG 1503 Developed/Disturbed 4.18 Acres Construction DisturbanceVEG 1503 Developed/Disturbed 1.06 Acres Operation DisturbanceVEG 1503 Grassland 0.08 Acres Construction DisturbanceVEG 1503 Grassland 0.04 Acres Operation DisturbanceVEG 1503 Montane Shrubland 1.34 Acres Construction DisturbanceVEG 1503 Montane Shrubland 0.34 Acres Operation DisturbanceVEG 1503 Pinyon-Juniper 54.82 Acres Construction DisturbanceVEG 1503 Pinyon-Juniper 16.18 Acres Operation Disturbance

Page 342: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

VEG 1503 Sagebrush Shrubland 54.08 Acres Construction DisturbanceVEG 1503 Sagebrush Shrubland 14.63 Acres Operation DisturbanceVEG 1503 Woody Riparian and Wetlands 0.31 Acres Construction DisturbanceVEG 1503 Woody Riparian and Wetlands 0.09 Acres Operation DisturbanceVEG 1503.5 Developed/Disturbed 0.33 Acres Construction DisturbanceVEG 1503.5 Developed/Disturbed 0.05 Acres Operation DisturbanceVEG 1503.5 Pinyon-Juniper 1.45 Acres Construction DisturbanceVEG 1503.5 Pinyon-Juniper 0.18 Acres Operation DisturbanceVEG 1503.5 Sagebrush Shrubland 12.12 Acres Construction DisturbanceVEG 1503.5 Sagebrush Shrubland 1.70 Acres Operation DisturbanceVEG 1504 Developed/Disturbed 1.63 Acres Construction DisturbanceVEG 1504 Developed/Disturbed 0.53 Acres Operation DisturbanceVEG 1504 Montane Shrubland 0.39 Acres Construction DisturbanceVEG 1504 Montane Shrubland 0.18 Acres Operation DisturbanceVEG 1504 Pinyon-Juniper 52.07 Acres Construction DisturbanceVEG 1504 Pinyon-Juniper 16.70 Acres Operation DisturbanceVEG 1504 Sagebrush Shrubland 53.83 Acres Construction DisturbanceVEG 1504 Sagebrush Shrubland 16.74 Acres Operation DisturbanceVEG 1504 Woody Riparian and Wetlands 0.27 Acres Construction DisturbanceVEG 1504 Woody Riparian and Wetlands 0.09 Acres Operation DisturbanceVEG 1505 Aspen Forest and Woodland 1.68 Acres Construction DisturbanceVEG 1505 Aspen Forest and Woodland 0.63 Acres Operation DisturbanceVEG 1505 Cliff and Canyon 0.71 Acres Construction DisturbanceVEG 1505 Cliff and Canyon 0.20 Acres Operation DisturbanceVEG 1505 Desert Shrub 0.48 Acres Construction DisturbanceVEG 1505 Desert Shrub 0.23 Acres Operation DisturbanceVEG 1505 Developed/Disturbed 1.29 Acres Construction DisturbanceVEG 1505 Developed/Disturbed 0.55 Acres Operation DisturbanceVEG 1505 Grassland 1.60 Acres Construction DisturbanceVEG 1505 Grassland 1.14 Acres Operation DisturbanceVEG 1505 Montane Shrubland 49.61 Acres Construction DisturbanceVEG 1505 Montane Shrubland 15.70 Acres Operation DisturbanceVEG 1505 Pinyon-Juniper 75.41 Acres Construction DisturbanceVEG 1505 Pinyon-Juniper 26.75 Acres Operation DisturbanceVEG 1505 Sagebrush Shrubland 54.96 Acres Construction DisturbanceVEG 1505 Sagebrush Shrubland 26.18 Acres Operation DisturbanceVEG 1505 Woody Riparian and Wetlands 4.74 Acres Construction DisturbanceVEG 1505 Woody Riparian and Wetlands 2.18 Acres Operation DisturbanceVEG 1506 Agriculture 8.54 Acres Construction DisturbanceVEG 1506 Agriculture 1.67 Acres Operation DisturbanceVEG 1506 Aspen Forest and Woodland 0.12 Acres Construction DisturbanceVEG 1506 Aspen Forest and Woodland 0.03 Acres Operation DisturbanceVEG 1506 Cliff and Canyon 0.33 Acres Construction DisturbanceVEG 1506 Cliff and Canyon 0.14 Acres Operation DisturbanceVEG 1506 Conifer Forest 0.17 Acres Construction Disturbance

Page 343: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

VEG 1506 Conifer Forest 0.04 Acres Operation DisturbanceVEG 1506 Desert Shrub 11.58 Acres Construction DisturbanceVEG 1506 Desert Shrub 2.53 Acres Operation DisturbanceVEG 1506 Developed/Disturbed 8.24 Acres Construction DisturbanceVEG 1506 Developed/Disturbed 1.95 Acres Operation DisturbanceVEG 1506 Grassland 23.01 Acres Construction DisturbanceVEG 1506 Grassland 4.96 Acres Operation DisturbanceVEG 1506 Greasewood Flat 1.07 Acres Construction DisturbanceVEG 1506 Greasewood Flat 0.31 Acres Operation DisturbanceVEG 1506 Herbaceous Wetland 2.07 Acres Construction DisturbanceVEG 1506 Herbaceous Wetland 0.52 Acres Operation DisturbanceVEG 1506 Montane Grassland 0.01 Acres Construction DisturbanceVEG 1506 Montane Grassland 0.00 Acres Operation DisturbanceVEG 1506 Montane Shrubland 15.24 Acres Construction DisturbanceVEG 1506 Montane Shrubland 3.76 Acres Operation DisturbanceVEG 1506 Open Water 0.42 Acres Construction DisturbanceVEG 1506 Open Water 0.19 Acres Operation DisturbanceVEG 1506 Pinyon-Juniper 219.25 Acres Construction DisturbanceVEG 1506 Pinyon-Juniper 57.12 Acres Operation DisturbanceVEG 1506 Sagebrush Shrubland 162.61 Acres Construction DisturbanceVEG 1506 Sagebrush Shrubland 38.67 Acres Operation DisturbanceVEG 1506 Saltbush Shrubland 0.18 Acres Construction DisturbanceVEG 1506 Saltbush Shrubland 0.08 Acres Operation DisturbanceVEG 1506 Woody Riparian and Wetlands 8.42 Acres Construction DisturbanceVEG 1506 Woody Riparian and Wetlands 1.85 Acres Operation DisturbanceVEG 1510 Cliff and Canyon 1.26 Acres Construction DisturbanceVEG 1510 Cliff and Canyon 0.53 Acres Operation DisturbanceVEG 1510 Desert Shrub 206.80 Acres Construction DisturbanceVEG 1510 Desert Shrub 60.93 Acres Operation DisturbanceVEG 1510 Developed/Disturbed 0.01 Acres Construction DisturbanceVEG 1510 Developed/Disturbed 0.00 Acres Operation DisturbanceVEG 1510 Grassland 7.52 Acres Construction DisturbanceVEG 1510 Grassland 1.94 Acres Operation DisturbanceVEG 1510 Greasewood Flat 0.09 Acres Construction DisturbanceVEG 1510 Greasewood Flat 0.02 Acres Operation DisturbanceVEG 1510 Herbaceous Wetland 0.94 Acres Construction DisturbanceVEG 1510 Herbaceous Wetland 0.26 Acres Operation DisturbanceVEG 1510 Montane Shrubland 162.62 Acres Construction DisturbanceVEG 1510 Montane Shrubland 36.57 Acres Operation DisturbanceVEG 1510 Pinyon-Juniper 245.21 Acres Construction DisturbanceVEG 1510 Pinyon-Juniper 61.53 Acres Operation DisturbanceVEG 1510 Riparian 3.67 Acres Construction DisturbanceVEG 1510 Riparian 1.04 Acres Operation DisturbanceVEG 1510 Sagebrush Shrubland 146.37 Acres Construction DisturbanceVEG 1510 Sagebrush Shrubland 34.21 Acres Operation Disturbance

Page 344: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

VEG 1510 Saltbush Shrubland 0.51 Acres Construction DisturbanceVEG 1510 Saltbush Shrubland 0.15 Acres Operation DisturbanceVEG 1510 Woody Riparian and Wetlands 24.52 Acres Construction DisturbanceVEG 1510 Woody Riparian and Wetlands 5.16 Acres Operation DisturbanceVEG 1520 Barren/Sparsely Vegetated 0.50 Acres Construction DisturbanceVEG 1520 Barren/Sparsely Vegetated 0.09 Acres Operation DisturbanceVEG 1520 Cliff and Canyon 15.24 Acres Construction DisturbanceVEG 1520 Cliff and Canyon 4.35 Acres Operation DisturbanceVEG 1520 Desert Shrub 846.57 Acres Construction DisturbanceVEG 1520 Desert Shrub 175.77 Acres Operation DisturbanceVEG 1520 Grassland 74.17 Acres Construction DisturbanceVEG 1520 Grassland 20.32 Acres Operation DisturbanceVEG 1520 Greasewood Flat 5.92 Acres Construction DisturbanceVEG 1520 Greasewood Flat 1.67 Acres Operation DisturbanceVEG 1520 Herbaceous Wetland 24.35 Acres Construction DisturbanceVEG 1520 Herbaceous Wetland 6.62 Acres Operation DisturbanceVEG 1520 Pinyon-Juniper 200.25 Acres Construction DisturbanceVEG 1520 Pinyon-Juniper 44.89 Acres Operation DisturbanceVEG 1520 Riparian 8.10 Acres Construction DisturbanceVEG 1520 Riparian 1.67 Acres Operation DisturbanceVEG 1520 Sagebrush Shrubland 311.84 Acres Construction DisturbanceVEG 1520 Sagebrush Shrubland 76.36 Acres Operation DisturbanceVEG 1520 Saltbush Shrubland 78.95 Acres Construction DisturbanceVEG 1520 Saltbush Shrubland 22.26 Acres Operation DisturbanceVEG 1520 Woody Riparian and Wetlands 0.53 Acres Construction DisturbanceVEG 1520 Woody Riparian and Wetlands 0.10 Acres Operation DisturbanceVEG 1530 Cliff and Canyon 0.28 Acres Construction DisturbanceVEG 1530 Cliff and Canyon 0.07 Acres Operation DisturbanceVEG 1530 Desert Shrub 85.96 Acres Construction DisturbanceVEG 1530 Desert Shrub 18.31 Acres Operation DisturbanceVEG 1530 Herbaceous Wetland 0.42 Acres Construction DisturbanceVEG 1530 Herbaceous Wetland 0.06 Acres Operation DisturbanceVEG 1540.1 Agriculture 1.41 Acres Construction DisturbanceVEG 1540.1 Agriculture 0.33 Acres Operation DisturbanceVEG 1540.1 Barren/Sparsely Vegetated 4.61 Acres Construction DisturbanceVEG 1540.1 Barren/Sparsely Vegetated 0.91 Acres Operation DisturbanceVEG 1540.1 Cliff and Canyon 1.19 Acres Construction DisturbanceVEG 1540.1 Cliff and Canyon 0.35 Acres Operation DisturbanceVEG 1540.1 Desert Shrub 220.46 Acres Construction DisturbanceVEG 1540.1 Desert Shrub 29.57 Acres Operation DisturbanceVEG 1540.1 Developed/Disturbed 1.71 Acres Construction DisturbanceVEG 1540.1 Developed/Disturbed 0.63 Acres Operation DisturbanceVEG 1540.1 Herbaceous Wetland 0.33 Acres Construction DisturbanceVEG 1540.1 Herbaceous Wetland 0.08 Acres Operation DisturbanceVEG 1540.1 Riparian 23.90 Acres Construction Disturbance

Page 345: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

VEG 1540.1 Riparian 4.76 Acres Operation DisturbanceVEG 1540.1 Saltbush Shrubland 0.15 Acres Construction DisturbanceVEG 1540.1 Saltbush Shrubland 0.05 Acres Operation DisturbanceVEG 1540.1 Woody Riparian and Wetlands 1.05 Acres Construction DisturbanceVEG 1540.1 Woody Riparian and Wetlands 0.22 Acres Operation DisturbanceVEG 1540.2 Agriculture 1.33 Acres Construction DisturbanceVEG 1540.2 Agriculture 0.23 Acres Operation DisturbanceVEG 1540.2 Barren/Sparsely Vegetated 2.61 Acres Construction DisturbanceVEG 1540.2 Barren/Sparsely Vegetated 0.67 Acres Operation DisturbanceVEG 1540.2 Cliff and Canyon 0.27 Acres Construction DisturbanceVEG 1540.2 Cliff and Canyon 0.07 Acres Operation DisturbanceVEG 1540.2 Desert Shrub 193.18 Acres Construction DisturbanceVEG 1540.2 Desert Shrub 25.89 Acres Operation DisturbanceVEG 1540.2 Herbaceous Wetland 0.06 Acres Construction DisturbanceVEG 1540.2 Herbaceous Wetland 0.02 Acres Operation DisturbanceVEG 1540.2 Open Water 0.19 Acres Construction DisturbanceVEG 1540.2 Open Water 0.07 Acres Operation DisturbanceVEG 1540.2 Riparian 23.90 Acres Construction DisturbanceVEG 1540.2 Riparian 3.14 Acres Operation DisturbanceVEG 1540.2 Saltbush Shrubland 5.35 Acres Construction DisturbanceVEG 1540.2 Saltbush Shrubland 0.61 Acres Operation DisturbanceVEG 1540.2 Woody Riparian and Wetlands 1.40 Acres Construction DisturbanceVEG 1540.2 Woody Riparian and Wetlands 0.22 Acres Operation DisturbanceVEG 1545 Barren/Sparsely Vegetated 9.29 Acres Construction DisturbanceVEG 1545 Barren/Sparsely Vegetated 1.61 Acres Operation DisturbanceVEG 1545 Cliff and Canyon 0.18 Acres Construction DisturbanceVEG 1545 Cliff and Canyon 0.03 Acres Operation DisturbanceVEG 1545 Desert Shrub 38.62 Acres Construction DisturbanceVEG 1545 Desert Shrub 6.19 Acres Operation DisturbanceVEG 1545 Developed/Disturbed 1.17 Acres Construction DisturbanceVEG 1545 Developed/Disturbed 0.21 Acres Operation DisturbanceVEG 1545 Herbaceous Wetland 0.21 Acres Construction DisturbanceVEG 1545 Herbaceous Wetland 0.04 Acres Operation DisturbanceVEG 1545 Riparian 2.27 Acres Construction DisturbanceVEG 1545 Riparian 0.41 Acres Operation DisturbanceVEG 1545 Saltbush Shrubland 1.24 Acres Construction DisturbanceVEG 1545 Saltbush Shrubland 0.21 Acres Operation DisturbanceVEG 1545 Woody Riparian and Wetlands 1.32 Acres Construction DisturbanceVEG 1545 Woody Riparian and Wetlands 0.27 Acres Operation DisturbanceVEG 1550.1 Agriculture 0.79 Acres Construction DisturbanceVEG 1550.1 Agriculture 0.23 Acres Operation DisturbanceVEG 1550.1 Barren/Sparsely Vegetated 15.72 Acres Construction DisturbanceVEG 1550.1 Barren/Sparsely Vegetated 4.39 Acres Operation DisturbanceVEG 1550.1 Cliff and Canyon 15.38 Acres Construction DisturbanceVEG 1550.1 Cliff and Canyon 4.20 Acres Operation Disturbance

Page 346: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

VEG 1550.1 Desert Shrub 282.69 Acres Construction DisturbanceVEG 1550.1 Desert Shrub 90.93 Acres Operation DisturbanceVEG 1550.1 Developed/Disturbed 1.57 Acres Construction DisturbanceVEG 1550.1 Developed/Disturbed 0.67 Acres Operation DisturbanceVEG 1550.1 Herbaceous Wetland 0.28 Acres Construction DisturbanceVEG 1550.1 Herbaceous Wetland 0.08 Acres Operation DisturbanceVEG 1550.1 Riparian 28.28 Acres Construction DisturbanceVEG 1550.1 Riparian 8.94 Acres Operation DisturbanceVEG 1550.1 Saltbush Shrubland 0.14 Acres Construction DisturbanceVEG 1550.1 Saltbush Shrubland 0.07 Acres Operation DisturbanceVEG 1550.1 Woody Riparian and Wetlands 6.71 Acres Construction DisturbanceVEG 1550.1 Woody Riparian and Wetlands 1.77 Acres Operation DisturbanceVEG 1550.2 Barren/Sparsely Vegetated 0.01 Acres Construction DisturbanceVEG 1550.2 Barren/Sparsely Vegetated 0.00 Acres Operation DisturbanceVEG 1550.2 Cliff and Canyon 0.52 Acres Construction DisturbanceVEG 1550.2 Cliff and Canyon 0.13 Acres Operation DisturbanceVEG 1550.2 Desert Shrub 128.10 Acres Construction DisturbanceVEG 1550.2 Desert Shrub 28.50 Acres Operation DisturbanceVEG 1550.2 Developed/Disturbed 0.19 Acres Construction DisturbanceVEG 1550.2 Developed/Disturbed 0.05 Acres Operation DisturbanceVEG 1550.2 Riparian 16.25 Acres Construction DisturbanceVEG 1550.2 Riparian 3.67 Acres Operation DisturbanceVEG 1550.2 Saltbush Shrubland 0.07 Acres Construction DisturbanceVEG 1550.2 Saltbush Shrubland 0.01 Acres Operation DisturbanceVEG 1560 Cliff and Canyon 0.00 Acres Construction DisturbanceVEG 1560 Cliff and Canyon 0.00 Acres Operation DisturbanceVEG 1560 Desert Shrub 138.00 Acres Construction DisturbanceVEG 1560 Desert Shrub 28.16 Acres Operation DisturbanceVEG 1560 Herbaceous Wetland 0.05 Acres Construction DisturbanceVEG 1560 Herbaceous Wetland 0.01 Acres Operation DisturbanceVEG 1560 Riparian 0.89 Acres Construction DisturbanceVEG 1560 Riparian 0.21 Acres Operation DisturbanceVEG 1560 Saltbush Shrubland 4.36 Acres Construction DisturbanceVEG 1560 Saltbush Shrubland 0.89 Acres Operation DisturbanceVEG 1560 Woody Riparian and Wetlands 0.01 Acres Construction DisturbanceVEG 1560 Woody Riparian and Wetlands 0.00 Acres Operation DisturbanceVEG 1570 Desert Shrub 96.03 Acres Construction DisturbanceVEG 1570 Desert Shrub 18.86 Acres Operation DisturbanceVEG 1570 Developed/Disturbed 0.97 Acres Construction DisturbanceVEG 1570 Developed/Disturbed 0.19 Acres Operation DisturbanceVEG 1570 Riparian 25.03 Acres Construction DisturbanceVEG 1570 Riparian 4.89 Acres Operation DisturbanceVEG 1570 Saltbush Shrubland 0.01 Acres Construction DisturbanceVEG 1570 Saltbush Shrubland 0.00 Acres Operation DisturbanceVEG 1570 Woody Riparian and Wetlands 0.34 Acres Construction Disturbance

Page 347: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

VEG 1570 Woody Riparian and Wetlands 0.07 Acres Operation DisturbanceVEG 1580 Barren/Sparsely Vegetated 0.28 Acres Construction DisturbanceVEG 1580 Barren/Sparsely Vegetated 0.06 Acres Operation DisturbanceVEG 1580 Desert Shrub 33.22 Acres Construction DisturbanceVEG 1580 Desert Shrub 5.52 Acres Operation DisturbanceVEG 1580 Riparian 19.65 Acres Construction DisturbanceVEG 1580 Riparian 3.21 Acres Operation DisturbanceVEG 1590 Cliff and Canyon 0.14 Acres Construction DisturbanceVEG 1590 Cliff and Canyon 0.05 Acres Operation DisturbanceVEG 1590 Desert Shrub 79.45 Acres Construction DisturbanceVEG 1590 Desert Shrub 11.22 Acres Operation DisturbanceVEG 1590 Developed/Disturbed 0.91 Acres Construction DisturbanceVEG 1590 Developed/Disturbed 0.11 Acres Operation DisturbanceVEG 1590 Riparian 0.23 Acres Construction DisturbanceVEG 1590 Riparian 0.08 Acres Operation DisturbanceVEG 1590 Saltbush Shrubland 0.22 Acres Construction DisturbanceVEG 1590 Saltbush Shrubland 0.08 Acres Operation DisturbanceVEG 1590 Woody Riparian and Wetlands 0.03 Acres Construction DisturbanceVEG 1590 Woody Riparian and Wetlands 0.01 Acres Operation DisturbanceVEG 1600 Cliff and Canyon 2.12 Acres Construction DisturbanceVEG 1600 Cliff and Canyon 0.83 Acres Operation DisturbanceVEG 1600 Desert Shrub 85.95 Acres Construction DisturbanceVEG 1600 Desert Shrub 20.00 Acres Operation DisturbanceVEG 1600 Saltbush Shrubland 0.14 Acres Construction DisturbanceVEG 1600 Saltbush Shrubland 0.04 Acres Operation DisturbanceVEG 1610 Barren/Sparsely Vegetated 1.50 Acres Construction DisturbanceVEG 1610 Barren/Sparsely Vegetated 0.37 Acres Operation DisturbanceVEG 1610 Cliff and Canyon 7.92 Acres Construction DisturbanceVEG 1610 Cliff and Canyon 1.63 Acres Operation DisturbanceVEG 1610 Desert Shrub 253.98 Acres Construction DisturbanceVEG 1610 Desert Shrub 48.24 Acres Operation DisturbanceVEG 1610 Developed/Disturbed 2.60 Acres Construction DisturbanceVEG 1610 Developed/Disturbed 0.47 Acres Operation DisturbanceVEG 1610 Grassland 0.00 Acres Construction DisturbanceVEG 1610 Grassland 0.00 Acres Operation DisturbanceVEG 1610 Herbaceous Wetland 0.98 Acres Construction DisturbanceVEG 1610 Herbaceous Wetland 0.18 Acres Operation DisturbanceVEG 1610 Open Water 0.00 Acres Construction DisturbanceVEG 1610 Open Water 0.00 Acres Operation DisturbanceVEG 1610 Riparian 3.20 Acres Construction DisturbanceVEG 1610 Riparian 0.58 Acres Operation DisturbanceVEG 1610 Saltbush Shrubland 0.59 Acres Construction DisturbanceVEG 1610 Saltbush Shrubland 0.12 Acres Operation DisturbanceVEG 1620 Barren/Sparsely Vegetated 1.53 Acres Construction DisturbanceVEG 1620 Barren/Sparsely Vegetated 0.42 Acres Operation Disturbance

Page 348: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

VEG 1620 Cliff and Canyon 0.03 Acres Construction DisturbanceVEG 1620 Cliff and Canyon 0.01 Acres Operation DisturbanceVEG 1620 Desert Shrub 67.50 Acres Construction DisturbanceVEG 1620 Desert Shrub 14.49 Acres Operation DisturbanceVEG 1620 Riparian 1.01 Acres Construction DisturbanceVEG 1620 Riparian 0.28 Acres Operation DisturbanceVEG 1620 Saltbush Shrubland 0.73 Acres Construction DisturbanceVEG 1620 Saltbush Shrubland 0.15 Acres Operation DisturbanceVEG 1630 Barren/Sparsely Vegetated 12.26 Acres Construction DisturbanceVEG 1630 Barren/Sparsely Vegetated 1.53 Acres Operation DisturbanceVEG 1630 Cliff and Canyon 1.01 Acres Construction DisturbanceVEG 1630 Cliff and Canyon 0.29 Acres Operation DisturbanceVEG 1630 Desert Shrub 30.34 Acres Construction DisturbanceVEG 1630 Desert Shrub 7.75 Acres Operation DisturbanceVEG 1630 Riparian 3.32 Acres Construction DisturbanceVEG 1630 Riparian 0.56 Acres Operation DisturbanceVEG 1630 Saltbush Shrubland 0.57 Acres Construction DisturbanceVEG 1630 Saltbush Shrubland 0.07 Acres Operation DisturbanceVEG 1630 Woody Riparian and Wetlands 0.00 Acres Construction DisturbanceVEG 1630 Woody Riparian and Wetlands 0.00 Acres Operation DisturbanceVEG 1640 Barren/Sparsely Vegetated 19.54 Acres Construction DisturbanceVEG 1640 Barren/Sparsely Vegetated 3.16 Acres Operation DisturbanceVEG 1640 Cliff and Canyon 10.30 Acres Construction DisturbanceVEG 1640 Cliff and Canyon 1.50 Acres Operation DisturbanceVEG 1640 Desert Shrub 29.00 Acres Construction DisturbanceVEG 1640 Desert Shrub 4.06 Acres Operation DisturbanceVEG 1640 Herbaceous Wetland 0.30 Acres Construction DisturbanceVEG 1640 Herbaceous Wetland 0.07 Acres Operation DisturbanceVEG 1640 Open Water 0.01 Acres Construction DisturbanceVEG 1640 Open Water 0.00 Acres Operation DisturbanceVEG 1640 Riparian 0.07 Acres Construction DisturbanceVEG 1640 Riparian 0.02 Acres Operation DisturbanceVEG 1640 Saltbush Shrubland 0.46 Acres Construction DisturbanceVEG 1640 Saltbush Shrubland 0.08 Acres Operation DisturbanceVEG 1640 Woody Riparian and Wetlands 0.01 Acres Construction DisturbanceVEG 1640 Woody Riparian and Wetlands 0.00 Acres Operation DisturbanceVEG 1650 Barren/Sparsely Vegetated 26.05 Acres Construction DisturbanceVEG 1650 Barren/Sparsely Vegetated 4.07 Acres Operation DisturbanceVEG 1650 Cliff and Canyon 1.49 Acres Construction DisturbanceVEG 1650 Cliff and Canyon 0.20 Acres Operation DisturbanceVEG 1650 Desert Shrub 23.42 Acres Construction DisturbanceVEG 1650 Desert Shrub 3.85 Acres Operation DisturbanceVEG 1650 Herbaceous Wetland 0.03 Acres Construction DisturbanceVEG 1650 Herbaceous Wetland 0.01 Acres Operation DisturbanceVEG 1650 Riparian 0.11 Acres Construction Disturbance

Page 349: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

VEG 1650 Riparian 0.03 Acres Operation DisturbanceVEG 1650 Saltbush Shrubland 0.00 Acres Construction DisturbanceVEG 1650 Saltbush Shrubland 0.00 Acres Operation DisturbanceVEG 1660 Barren/Sparsely Vegetated 13.64 Acres Construction DisturbanceVEG 1660 Barren/Sparsely Vegetated 2.81 Acres Operation DisturbanceVEG 1660 Cliff and Canyon 11.93 Acres Construction DisturbanceVEG 1660 Cliff and Canyon 2.69 Acres Operation DisturbanceVEG 1660 Desert Shrub 90.83 Acres Construction DisturbanceVEG 1660 Desert Shrub 23.77 Acres Operation DisturbanceVEG 1660 Developed/Disturbed 9.57 Acres Construction DisturbanceVEG 1660 Developed/Disturbed 1.91 Acres Operation DisturbanceVEG 1660 Herbaceous Wetland 0.00 Acres Construction DisturbanceVEG 1660 Herbaceous Wetland 0.00 Acres Operation DisturbanceVEG 1660 Riparian 0.75 Acres Construction DisturbanceVEG 1660 Riparian 0.24 Acres Operation DisturbanceVEG 1660 Saltbush Shrubland 0.04 Acres Construction DisturbanceVEG 1660 Saltbush Shrubland 0.03 Acres Operation DisturbanceVEG 1660 Woody Riparian and Wetlands 0.01 Acres Construction DisturbanceVEG 1660 Woody Riparian and Wetlands 0.01 Acres Operation DisturbanceVEG 1670 Barren/Sparsely Vegetated 16.59 Acres Construction DisturbanceVEG 1670 Barren/Sparsely Vegetated 4.63 Acres Operation DisturbanceVEG 1670 Cliff and Canyon 1.07 Acres Construction DisturbanceVEG 1670 Cliff and Canyon 0.34 Acres Operation DisturbanceVEG 1670 Desert Shrub 41.30 Acres Construction DisturbanceVEG 1670 Desert Shrub 11.69 Acres Operation DisturbanceVEG 1670 Developed/Disturbed 0.01 Acres Construction DisturbanceVEG 1670 Developed/Disturbed 0.00 Acres Operation DisturbanceVEG 1670 Herbaceous Wetland 0.53 Acres Construction DisturbanceVEG 1670 Herbaceous Wetland 0.14 Acres Operation DisturbanceVEG 1670 Open Water 0.28 Acres Construction DisturbanceVEG 1670 Open Water 0.12 Acres Operation DisturbanceVEG 1670 Riparian 0.02 Acres Construction DisturbanceVEG 1670 Riparian 0.01 Acres Operation DisturbanceVEG 1670 Woody Riparian and Wetlands 1.14 Acres Construction DisturbanceVEG 1670 Woody Riparian and Wetlands 0.29 Acres Operation DisturbanceVEG 1680 Barren/Sparsely Vegetated 1.89 Acres Construction DisturbanceVEG 1680 Barren/Sparsely Vegetated 0.43 Acres Operation DisturbanceVEG 1680 Cliff and Canyon 0.31 Acres Construction DisturbanceVEG 1680 Cliff and Canyon 0.17 Acres Operation DisturbanceVEG 1680 Desert Shrub 56.71 Acres Construction DisturbanceVEG 1680 Desert Shrub 15.27 Acres Operation DisturbanceVEG 1680 Developed/Disturbed 16.38 Acres Construction DisturbanceVEG 1680 Developed/Disturbed 4.61 Acres Operation DisturbanceVEG 1690 Cliff and Canyon 1.57 Acres Construction DisturbanceVEG 1690 Cliff and Canyon 0.37 Acres Operation Disturbance

Page 350: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

VEG 1690 Desert Shrub 71.43 Acres Construction DisturbanceVEG 1690 Desert Shrub 20.39 Acres Operation DisturbanceVEG 1690 Developed/Disturbed 25.20 Acres Construction DisturbanceVEG 1690 Developed/Disturbed 5.81 Acres Operation DisturbanceVEG 1700 Developed/Disturbed 33.15 Acres Construction DisturbanceVEG 1700 Developed/Disturbed 5.13 Acres Operation DisturbanceVEG 1710 Barren/Sparsely Vegetated 1.43 Acres Construction DisturbanceVEG 1710 Barren/Sparsely Vegetated 0.38 Acres Operation DisturbanceVEG 1710 Cliff and Canyon 1.08 Acres Construction DisturbanceVEG 1710 Cliff and Canyon 0.57 Acres Operation DisturbanceVEG 1710 Desert Shrub 122.01 Acres Construction DisturbanceVEG 1710 Desert Shrub 34.74 Acres Operation DisturbanceVEG 1710 Herbaceous Wetland 0.13 Acres Construction DisturbanceVEG 1710 Herbaceous Wetland 0.07 Acres Operation DisturbanceVEG 1710 Open Water 2.79 Acres Construction DisturbanceVEG 1710 Open Water 1.47 Acres Operation DisturbanceVEG 1710 Woody Riparian and Wetlands 2.88 Acres Construction DisturbanceVEG 1710 Woody Riparian and Wetlands 0.90 Acres Operation DisturbanceVEG 1730 Barren/Sparsely Vegetated 0.52 Acres Construction DisturbanceVEG 1730 Barren/Sparsely Vegetated 0.09 Acres Operation DisturbanceVEG 1730 Cliff and Canyon 7.25 Acres Construction DisturbanceVEG 1730 Cliff and Canyon 3.21 Acres Operation DisturbanceVEG 1730 Desert Shrub 144.10 Acres Construction DisturbanceVEG 1730 Desert Shrub 49.56 Acres Operation DisturbanceVEG 1730 Developed/Disturbed 12.81 Acres Construction DisturbanceVEG 1730 Developed/Disturbed 5.03 Acres Operation DisturbanceVEG 1730 Grassland 0.11 Acres Construction DisturbanceVEG 1730 Grassland 0.03 Acres Operation DisturbanceVEG 1730 Riparian 0.39 Acres Construction DisturbanceVEG 1730 Riparian 0.11 Acres Operation DisturbanceVEG 1740 Cliff and Canyon 0.42 Acres Construction DisturbanceVEG 1740 Cliff and Canyon 0.28 Acres Operation DisturbanceVEG 1740 Desert Shrub 23.82 Acres Construction DisturbanceVEG 1740 Desert Shrub 9.43 Acres Operation DisturbanceVEG 1740 Developed/Disturbed 54.20 Acres Construction DisturbanceVEG 1740 Developed/Disturbed 19.09 Acres Operation DisturbanceVEG 1740 Herbaceous Wetland 0.01 Acres Construction DisturbanceVEG 1740 Herbaceous Wetland 0.01 Acres Operation DisturbanceVEG 1740 Riparian 0.03 Acres Construction DisturbanceVEG 1740 Riparian 0.02 Acres Operation DisturbanceVEG 1750 Barren/Sparsely Vegetated 0.39 Acres Construction DisturbanceVEG 1750 Barren/Sparsely Vegetated 0.08 Acres Operation DisturbanceVEG 1750 Cliff and Canyon 0.36 Acres Construction DisturbanceVEG 1750 Cliff and Canyon 0.07 Acres Operation DisturbanceVEG 1750 Desert Shrub 4.38 Acres Construction Disturbance

Page 351: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

VEG 1750 Desert Shrub 0.87 Acres Operation DisturbanceVEG 1760 Barren/Sparsely Vegetated 0.00 Acres Construction DisturbanceVEG 1760 Barren/Sparsely Vegetated 0.00 Acres Operation DisturbanceVEG 1760 Cliff and Canyon 0.18 Acres Construction DisturbanceVEG 1760 Cliff and Canyon 0.05 Acres Operation DisturbanceVEG 1760 Desert Shrub 19.98 Acres Construction DisturbanceVEG 1760 Desert Shrub 4.19 Acres Operation DisturbanceVEG 1760 Developed/Disturbed 105.71 Acres Construction DisturbanceVEG 1760 Developed/Disturbed 23.71 Acres Operation DisturbanceVEG 1771 Barren/Sparsely Vegetated 0.08 Acres Construction DisturbanceVEG 1771 Barren/Sparsely Vegetated 0.01 Acres Operation DisturbanceVEG 1771 Cliff and Canyon 0.02 Acres Construction DisturbanceVEG 1771 Cliff and Canyon 0.01 Acres Operation DisturbanceVEG 1771 Desert Shrub 56.90 Acres Construction DisturbanceVEG 1771 Desert Shrub 7.06 Acres Operation DisturbanceVEG 1771 Developed/Disturbed 236.38 Acres Construction DisturbanceVEG 1771 Developed/Disturbed 39.71 Acres Operation DisturbanceVEG 1771 Riparian 0.37 Acres Construction DisturbanceVEG 1771 Riparian 0.10 Acres Operation DisturbanceVEG 1771 Saltbush Shrubland 1.62 Acres Construction DisturbanceVEG 1771 Saltbush Shrubland 0.30 Acres Operation DisturbanceVEG 1771 Woody Riparian and Wetlands 0.09 Acres Construction DisturbanceVEG 1771 Woody Riparian and Wetlands 0.01 Acres Operation DisturbanceVEG 1772 Developed/Disturbed 3.91 Acres Construction DisturbanceVEG 1772 Developed/Disturbed 0.46 Acres Operation DisturbanceVEG 1780 Barren/Sparsely Vegetated 0.01 Acres Construction DisturbanceVEG 1780 Barren/Sparsely Vegetated 0.00 Acres Operation DisturbanceVEG 1780 Cliff and Canyon 0.32 Acres Construction DisturbanceVEG 1780 Cliff and Canyon 0.14 Acres Operation DisturbanceVEG 1780 Desert Shrub 9.47 Acres Construction DisturbanceVEG 1780 Desert Shrub 3.80 Acres Operation DisturbanceVEG 1780 Developed/Disturbed 58.80 Acres Construction DisturbanceVEG 1780 Developed/Disturbed 12.69 Acres Operation DisturbanceVEG 1790 Cliff and Canyon 5.61 Acres Construction DisturbanceVEG 1790 Cliff and Canyon 1.98 Acres Operation DisturbanceVEG 1790 Desert Shrub 126.71 Acres Construction DisturbanceVEG 1790 Desert Shrub 21.83 Acres Operation DisturbanceVEG 1790 Developed/Disturbed 47.19 Acres Construction DisturbanceVEG 1790 Developed/Disturbed 7.85 Acres Operation DisturbanceVEG 1800 Desert Shrub 14.04 Acres Construction DisturbanceVEG 1800 Desert Shrub 1.24 Acres Operation DisturbanceVEG 1800 Developed/Disturbed 1.85 Acres Construction DisturbanceVEG 1800 Developed/Disturbed 0.31 Acres Operation DisturbanceVEG 1810 Cliff and Canyon 0.79 Acres Construction DisturbanceVEG 1810 Cliff and Canyon 0.16 Acres Operation Disturbance

Page 352: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

VEG 1810 Desert Shrub 48.18 Acres Construction DisturbanceVEG 1810 Desert Shrub 8.78 Acres Operation DisturbanceVEG 1810 Developed/Disturbed 59.00 Acres Construction DisturbanceVEG 1810 Developed/Disturbed 10.42 Acres Operation DisturbanceVEG 1820 Desert Shrub 0.05 Acres Construction DisturbanceVEG 1820 Desert Shrub 0.00 Acres Operation DisturbanceVEG 1820 Developed/Disturbed 81.41 Acres Construction DisturbanceVEG 1820 Developed/Disturbed 11.68 Acres Operation DisturbanceVEG 1830 Developed/Disturbed 10.78 Acres Construction DisturbanceVEG 1830 Developed/Disturbed 0.77 Acres Operation DisturbanceViewer Sensitivity - High 1030 LOW 22.10 Miles Amount CrossedViewer Sensitivity - High 1030 MODERATE 10.14 Miles Amount CrossedViewer Sensitivity - High 1040 LOW 7.48 Miles Amount CrossedViewer Sensitivity - High 1040 MODERATE 1.70 Miles Amount CrossedViewer Sensitivity - High 1100 HIGH 0.61 Miles Amount CrossedViewer Sensitivity - High 1100 MODERATE 14.03 Miles Amount CrossedViewer Sensitivity - High 1101 MODERATE 0.80 Miles Amount CrossedViewer Sensitivity - High 1103 MODERATE 2.88 Miles Amount CrossedViewer Sensitivity - High 1104 HIGH 1.55 Miles Amount CrossedViewer Sensitivity - High 1104 MODERATE 2.40 Miles Amount CrossedViewer Sensitivity - High 1105 HIGH 1.70 Miles Amount CrossedViewer Sensitivity - High 1105 MODERATE 3.09 Miles Amount CrossedViewer Sensitivity - High 1106 LOW 5.66 Miles Amount CrossedViewer Sensitivity - High 1110 LOW 6.96 Miles Amount CrossedViewer Sensitivity - High 1115 HIGH 4.11 Miles Amount CrossedViewer Sensitivity - High 1115 LOW 11.51 Miles Amount CrossedViewer Sensitivity - High 1115 MODERATE 30.25 Miles Amount CrossedViewer Sensitivity - High 1116 HIGH 1.16 Miles Amount CrossedViewer Sensitivity - High 1116 MODERATE 6.24 Miles Amount CrossedViewer Sensitivity - High 1120 LOW 14.28 Miles Amount CrossedViewer Sensitivity - High 1120 MODERATE 18.39 Miles Amount CrossedViewer Sensitivity - High 1120.1 HIGH 0.28 Miles Amount CrossedViewer Sensitivity - High 1120.1 MODERATE 1.77 Miles Amount CrossedViewer Sensitivity - High 1120.2 MODERATE 3.04 Miles Amount CrossedViewer Sensitivity - High 1180 HIGH 1.98 Miles Amount CrossedViewer Sensitivity - High 1180 MODERATE 2.45 Miles Amount CrossedViewer Sensitivity - High 1187 HIGH 3.24 Miles Amount CrossedViewer Sensitivity - High 1187 LOW 1.22 Miles Amount CrossedViewer Sensitivity - High 1187 MODERATE 40.90 Miles Amount CrossedViewer Sensitivity - High 1190 HIGH 33.39 Miles Amount CrossedViewer Sensitivity - High 1190 LOW 34.93 Miles Amount CrossedViewer Sensitivity - High 1190 MODERATE 65.24 Miles Amount CrossedViewer Sensitivity - High 1210 HIGH 1.27 Miles Amount CrossedViewer Sensitivity - High 1210 LOW 20.61 Miles Amount CrossedViewer Sensitivity - High 1210 MODERATE 2.85 Miles Amount Crossed

Page 353: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

Viewer Sensitivity - High 1211 MODERATE 8.17 Miles Amount CrossedViewer Sensitivity - High 1212 LOW 13.75 Miles Amount CrossedViewer Sensitivity - High 1214 MODERATE 9.92 Miles Amount CrossedViewer Sensitivity - High 1215 LOW 6.45 Miles Amount CrossedViewer Sensitivity - High 1215 MODERATE 0.91 Miles Amount CrossedViewer Sensitivity - High 1215.05 LOW 9.58 Miles Amount CrossedViewer Sensitivity - High 1217.01 HIGH 16.20 Miles Amount CrossedViewer Sensitivity - High 1217.01 LOW 35.79 Miles Amount CrossedViewer Sensitivity - High 1217.01 MODERATE 24.84 Miles Amount CrossedViewer Sensitivity - High 1217.02 HIGH 1.48 Miles Amount CrossedViewer Sensitivity - High 1217.02 MODERATE 14.55 Miles Amount CrossedViewer Sensitivity - High 1217.051 HIGH 5.35 Miles Amount CrossedViewer Sensitivity - High 1217.051 MODERATE 14.95 Miles Amount CrossedViewer Sensitivity - High 1217.052 HIGH 13.37 Miles Amount CrossedViewer Sensitivity - High 1217.052 MODERATE 2.45 Miles Amount CrossedViewer Sensitivity - High 1217.1 HIGH 6.16 Miles Amount CrossedViewer Sensitivity - High 1217.1 LOW 2.22 Miles Amount CrossedViewer Sensitivity - High 1217.1 MODERATE 12.48 Miles Amount CrossedViewer Sensitivity - High 1217.15 HIGH 12.95 Miles Amount CrossedViewer Sensitivity - High 1217.15 LOW 1.00 Miles Amount CrossedViewer Sensitivity - High 1217.15 MODERATE 22.42 Miles Amount CrossedViewer Sensitivity - High 1218 HIGH 3.60 Miles Amount CrossedViewer Sensitivity - High 1218 MODERATE 8.37 Miles Amount CrossedViewer Sensitivity - High 1219.1 HIGH 0.60 Miles Amount CrossedViewer Sensitivity - High 1219.2 HIGH 18.10 Miles Amount CrossedViewer Sensitivity - High 1219.2 MODERATE 1.69 Miles Amount CrossedViewer Sensitivity - High 1219.3 HIGH 1.47 Miles Amount CrossedViewer Sensitivity - High 1219.4 HIGH 0.52 Miles Amount CrossedViewer Sensitivity - High 1219.4 MODERATE 0.42 Miles Amount CrossedViewer Sensitivity - High 1219.45 HIGH 1.35 Miles Amount CrossedViewer Sensitivity - High 1219.45 MODERATE 0.25 Miles Amount CrossedViewer Sensitivity - High 1219.5 HIGH 2.21 Miles Amount CrossedViewer Sensitivity - High 1219.5 MODERATE 14.62 Miles Amount CrossedViewer Sensitivity - High 1219.6 HIGH 2.77 Miles Amount CrossedViewer Sensitivity - High 1219.6 MODERATE 1.79 Miles Amount CrossedViewer Sensitivity - High 1220 HIGH 23.40 Miles Amount CrossedViewer Sensitivity - High 1220 LOW 34.67 Miles Amount CrossedViewer Sensitivity - High 1220 MODERATE 122.28 Miles Amount CrossedViewer Sensitivity - High 1222.05 HIGH 3.41 Miles Amount CrossedViewer Sensitivity - High 1222.05 MODERATE 37.76 Miles Amount CrossedViewer Sensitivity - High 1222.3 LOW 12.83 Miles Amount CrossedViewer Sensitivity - High 1222.3 MODERATE 1.34 Miles Amount CrossedViewer Sensitivity - High 1223 LOW 18.16 Miles Amount CrossedViewer Sensitivity - High 1225.2 HIGH 3.81 Miles Amount CrossedViewer Sensitivity - High 1225.2 LOW 7.74 Miles Amount Crossed

Page 354: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

Viewer Sensitivity - High 1225.2 MODERATE 26.85 Miles Amount CrossedViewer Sensitivity - High 1270 LOW 10.39 Miles Amount CrossedViewer Sensitivity - High 1270 MODERATE 0.39 Miles Amount CrossedViewer Sensitivity - High 1310 HIGH 20.06 Miles Amount CrossedViewer Sensitivity - High 1310 MODERATE 30.20 Miles Amount CrossedViewer Sensitivity - High 1320.05 HIGH 8.70 Miles Amount CrossedViewer Sensitivity - High 1320.05 LOW 19.93 Miles Amount CrossedViewer Sensitivity - High 1320.05 MODERATE 8.82 Miles Amount CrossedViewer Sensitivity - High 1320.15 HIGH 11.72 Miles Amount CrossedViewer Sensitivity - High 1320.15 MODERATE 16.26 Miles Amount CrossedViewer Sensitivity - High 1320.2 HIGH 1.74 Miles Amount CrossedViewer Sensitivity - High 1320.2 MODERATE 4.65 Miles Amount CrossedViewer Sensitivity - High 1320.21 HIGH 0.27 Miles Amount CrossedViewer Sensitivity - High 1321 LOW 15.70 Miles Amount CrossedViewer Sensitivity - High 1321 MODERATE 15.87 Miles Amount CrossedViewer Sensitivity - High 1322 HIGH 0.03 Miles Amount CrossedViewer Sensitivity - High 1322 LOW 3.43 Miles Amount CrossedViewer Sensitivity - High 1322 MODERATE 3.54 Miles Amount CrossedViewer Sensitivity - High 1322.5 HIGH 3.91 Miles Amount CrossedViewer Sensitivity - High 1322.5 MODERATE 3.50 Miles Amount CrossedViewer Sensitivity - High 1323 HIGH 10.84 Miles Amount CrossedViewer Sensitivity - High 1323 LOW 1.34 Miles Amount CrossedViewer Sensitivity - High 1323 MODERATE 9.46 Miles Amount CrossedViewer Sensitivity - High 1324 HIGH 4.65 Miles Amount CrossedViewer Sensitivity - High 1324.2 HIGH 4.69 Miles Amount CrossedViewer Sensitivity - High 1324.4 HIGH 4.75 Miles Amount CrossedViewer Sensitivity - High 1325 HIGH 7.52 Miles Amount CrossedViewer Sensitivity - High 1325 MODERATE 1.58 Miles Amount CrossedViewer Sensitivity - High 1325.1 HIGH 17.79 Miles Amount CrossedViewer Sensitivity - High 1325.1 LOW 0.46 Miles Amount CrossedViewer Sensitivity - High 1325.1 MODERATE 25.03 Miles Amount CrossedViewer Sensitivity - High 1325.2 HIGH 1.11 Miles Amount CrossedViewer Sensitivity - High 1325.2 MODERATE 3.01 Miles Amount CrossedViewer Sensitivity - High 1330.1 HIGH 9.59 Miles Amount CrossedViewer Sensitivity - High 1330.1 LOW 34.60 Miles Amount CrossedViewer Sensitivity - High 1330.1 MODERATE 54.75 Miles Amount CrossedViewer Sensitivity - High 1340 HIGH 4.00 Miles Amount CrossedViewer Sensitivity - High 1340 LOW 5.85 Miles Amount CrossedViewer Sensitivity - High 1340 MODERATE 10.16 Miles Amount CrossedViewer Sensitivity - High 1350 HIGH 3.79 Miles Amount CrossedViewer Sensitivity - High 1350 MODERATE 10.93 Miles Amount CrossedViewer Sensitivity - High 1360 HIGH 0.75 Miles Amount CrossedViewer Sensitivity - High 1360 LOW 13.64 Miles Amount CrossedViewer Sensitivity - High 1360 MODERATE 12.72 Miles Amount CrossedViewer Sensitivity - High 1370 LOW 9.35 Miles Amount Crossed

Page 355: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

Viewer Sensitivity - High 1370 MODERATE 5.33 Miles Amount CrossedViewer Sensitivity - High 1380 LOW 10.05 Miles Amount CrossedViewer Sensitivity - High 1380 MODERATE 3.17 Miles Amount CrossedViewer Sensitivity - High 1390 MODERATE 3.63 Miles Amount CrossedViewer Sensitivity - High 1400 HIGH 2.56 Miles Amount CrossedViewer Sensitivity - High 1400 MODERATE 21.48 Miles Amount CrossedViewer Sensitivity - High 1410 HIGH 3.24 Miles Amount CrossedViewer Sensitivity - High 1410 MODERATE 34.93 Miles Amount CrossedViewer Sensitivity - High 1420 LOW 7.95 Miles Amount CrossedViewer Sensitivity - High 1430 HIGH 2.93 Miles Amount CrossedViewer Sensitivity - High 1430 LOW 1.00 Miles Amount CrossedViewer Sensitivity - High 1430 MODERATE 14.52 Miles Amount CrossedViewer Sensitivity - High 1440 LOW 9.51 Miles Amount CrossedViewer Sensitivity - High 1450 LOW 7.01 Miles Amount CrossedViewer Sensitivity - High 1460 LOW 35.93 Miles Amount CrossedViewer Sensitivity - High 1470 HIGH 0.98 Miles Amount CrossedViewer Sensitivity - High 1470 LOW 26.30 Miles Amount CrossedViewer Sensitivity - High 1470 MODERATE 11.42 Miles Amount CrossedViewer Sensitivity - High 1480 LOW 58.65 Miles Amount CrossedViewer Sensitivity - High 1480 MODERATE 5.82 Miles Amount CrossedViewer Sensitivity - High 1490 MODERATE 14.10 Miles Amount CrossedViewer Sensitivity - High 1490.05 HIGH 6.99 Miles Amount CrossedViewer Sensitivity - High 1490.05 MODERATE 35.39 Miles Amount CrossedViewer Sensitivity - High 1495 LOW 3.89 Miles Amount CrossedViewer Sensitivity - High 1495 MODERATE 3.75 Miles Amount CrossedViewer Sensitivity - High 1500 LOW 19.32 Miles Amount CrossedViewer Sensitivity - High 1500.02 HIGH 0.28 Miles Amount CrossedViewer Sensitivity - High 1500.02 LOW 16.47 Miles Amount CrossedViewer Sensitivity - High 1500.02 MODERATE 1.87 Miles Amount CrossedViewer Sensitivity - High 1500.05 HIGH 6.38 Miles Amount CrossedViewer Sensitivity - High 1500.05 MODERATE 2.87 Miles Amount CrossedViewer Sensitivity - High 1501.1 HIGH 11.31 Miles Amount CrossedViewer Sensitivity - High 1501.1 MODERATE 2.85 Miles Amount CrossedViewer Sensitivity - High 1501.15 MODERATE 1.04 Miles Amount CrossedViewer Sensitivity - High 1502.5 HIGH 2.84 Miles Amount CrossedViewer Sensitivity - High 1502.5 LOW 30.01 Miles Amount CrossedViewer Sensitivity - High 1502.5 MODERATE 10.08 Miles Amount CrossedViewer Sensitivity - High 1503 HIGH 5.13 Miles Amount CrossedViewer Sensitivity - High 1503 MODERATE 1.47 Miles Amount CrossedViewer Sensitivity - High 1503.5 HIGH 0.32 Miles Amount CrossedViewer Sensitivity - High 1503.5 MODERATE 0.33 Miles Amount CrossedViewer Sensitivity - High 1504 HIGH 4.68 Miles Amount CrossedViewer Sensitivity - High 1504 MODERATE 2.31 Miles Amount CrossedViewer Sensitivity - High 1505 HIGH 9.25 Miles Amount CrossedViewer Sensitivity - High 1506 HIGH 13.59 Miles Amount Crossed

Page 356: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

Viewer Sensitivity - High 1506 MODERATE 14.97 Miles Amount CrossedViewer Sensitivity - High 1510 HIGH 6.30 Miles Amount CrossedViewer Sensitivity - High 1510 LOW 3.48 Miles Amount CrossedViewer Sensitivity - High 1510 MODERATE 46.73 Miles Amount CrossedViewer Sensitivity - High 1520 HIGH 43.29 Miles Amount CrossedViewer Sensitivity - High 1520 LOW 21.40 Miles Amount CrossedViewer Sensitivity - High 1520 MODERATE 60.07 Miles Amount CrossedViewer Sensitivity - High 1530 LOW 7.00 Miles Amount CrossedViewer Sensitivity - High 1540.1 LOW 21.41 Miles Amount CrossedViewer Sensitivity - High 1540.1 MODERATE 1.06 Miles Amount CrossedViewer Sensitivity - High 1540.2 LOW 16.46 Miles Amount CrossedViewer Sensitivity - High 1540.2 MODERATE 2.34 Miles Amount CrossedViewer Sensitivity - High 1545 HIGH 0.54 Miles Amount CrossedViewer Sensitivity - High 1545 MODERATE 2.51 Miles Amount CrossedViewer Sensitivity - High 1550.1 HIGH 1.03 Miles Amount CrossedViewer Sensitivity - High 1550.1 LOW 2.95 Miles Amount CrossedViewer Sensitivity - High 1550.1 MODERATE 21.00 Miles Amount CrossedViewer Sensitivity - High 1550.2 HIGH 0.78 Miles Amount CrossedViewer Sensitivity - High 1550.2 MODERATE 11.20 Miles Amount CrossedViewer Sensitivity - High 1560 HIGH 2.68 Miles Amount CrossedViewer Sensitivity - High 1560 MODERATE 8.80 Miles Amount CrossedViewer Sensitivity - High 1570 HIGH 3.04 Miles Amount CrossedViewer Sensitivity - High 1570 MODERATE 6.67 Miles Amount CrossedViewer Sensitivity - High 1580 LOW 3.62 Miles Amount CrossedViewer Sensitivity - High 1590 LOW 5.69 Miles Amount CrossedViewer Sensitivity - High 1590 MODERATE 1.33 Miles Amount CrossedViewer Sensitivity - High 1600 LOW 5.49 Miles Amount CrossedViewer Sensitivity - High 1610 LOW 11.35 Miles Amount CrossedViewer Sensitivity - High 1610 MODERATE 7.99 Miles Amount CrossedViewer Sensitivity - High 1620 LOW 4.22 Miles Amount CrossedViewer Sensitivity - High 1620 MODERATE 1.95 Miles Amount CrossedViewer Sensitivity - High 1630 MODERATE 4.09 Miles Amount CrossedViewer Sensitivity - High 1640 HIGH 2.48 Miles Amount CrossedViewer Sensitivity - High 1640 MODERATE 0.52 Miles Amount CrossedViewer Sensitivity - High 1650 HIGH 2.28 Miles Amount CrossedViewer Sensitivity - High 1650 MODERATE 0.49 Miles Amount CrossedViewer Sensitivity - High 1660 MODERATE 7.19 Miles Amount CrossedViewer Sensitivity - High 1670 HIGH 2.91 Miles Amount CrossedViewer Sensitivity - High 1670 MODERATE 1.88 Miles Amount CrossedViewer Sensitivity - High 1680 HIGH 3.36 Miles Amount CrossedViewer Sensitivity - High 1680 MODERATE 0.82 Miles Amount CrossedViewer Sensitivity - High 1690 HIGH 4.71 Miles Amount CrossedViewer Sensitivity - High 1690 MODERATE 0.71 Miles Amount CrossedViewer Sensitivity - High 1700 MODERATE 1.70 Miles Amount CrossedViewer Sensitivity - High 1710 HIGH 2.70 Miles Amount Crossed

Page 357: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

Viewer Sensitivity - High 1710 LOW 0.97 Miles Amount CrossedViewer Sensitivity - High 1710 MODERATE 4.64 Miles Amount CrossedViewer Sensitivity - High 1730 HIGH 4.19 Miles Amount CrossedViewer Sensitivity - High 1730 MODERATE 3.87 Miles Amount CrossedViewer Sensitivity - High 1740 MODERATE 4.84 Miles Amount CrossedViewer Sensitivity - High 1750 LOW 0.42 Miles Amount CrossedViewer Sensitivity - High 1760 LOW 3.35 Miles Amount CrossedViewer Sensitivity - High 1760 MODERATE 4.97 Miles Amount CrossedViewer Sensitivity - High 1771 LOW 19.99 Miles Amount CrossedViewer Sensitivity - High 1771 MODERATE 1.30 Miles Amount CrossedViewer Sensitivity - High 1772 LOW 0.31 Miles Amount CrossedViewer Sensitivity - High 1780 LOW 2.78 Miles Amount CrossedViewer Sensitivity - High 1780 MODERATE 0.98 Miles Amount CrossedViewer Sensitivity - High 1790 LOW 10.85 Miles Amount CrossedViewer Sensitivity - High 1790 MODERATE 1.84 Miles Amount CrossedViewer Sensitivity - High 1800 LOW 0.93 Miles Amount CrossedViewer Sensitivity - High 1810 LOW 2.43 Miles Amount CrossedViewer Sensitivity - High 1810 MODERATE 5.54 Miles Amount CrossedViewer Sensitivity - High 1820 LOW 7.09 Miles Amount CrossedViewer Sensitivity - High 1830 LOW 0.46 Miles Amount CrossedViewer Sensitivity - Moderate 1030 LOW 28.92 Miles Amount CrossedViewer Sensitivity - Moderate 1030 MODERATE 3.32 Miles Amount CrossedViewer Sensitivity - Moderate 1040 LOW 8.47 Miles Amount CrossedViewer Sensitivity - Moderate 1040 MODERATE 0.70 Miles Amount CrossedViewer Sensitivity - Moderate 1100 HIGH 5.74 Miles Amount CrossedViewer Sensitivity - Moderate 1100 MODERATE 8.90 Miles Amount CrossedViewer Sensitivity - Moderate 1101 HIGH 0.67 Miles Amount CrossedViewer Sensitivity - Moderate 1101 MODERATE 0.13 Miles Amount CrossedViewer Sensitivity - Moderate 1103 HIGH 2.88 Miles Amount CrossedViewer Sensitivity - Moderate 1104 HIGH 3.94 Miles Amount CrossedViewer Sensitivity - Moderate 1105 HIGH 1.20 Miles Amount CrossedViewer Sensitivity - Moderate 1105 MODERATE 3.59 Miles Amount CrossedViewer Sensitivity - Moderate 1106 LOW 3.50 Miles Amount CrossedViewer Sensitivity - Moderate 1106 MODERATE 2.16 Miles Amount CrossedViewer Sensitivity - Moderate 1110 LOW 6.96 Miles Amount CrossedViewer Sensitivity - Moderate 1115 LOW 41.28 Miles Amount CrossedViewer Sensitivity - Moderate 1115 MODERATE 4.59 Miles Amount CrossedViewer Sensitivity - Moderate 1116 LOW 6.11 Miles Amount CrossedViewer Sensitivity - Moderate 1116 MODERATE 1.29 Miles Amount CrossedViewer Sensitivity - Moderate 1120 HIGH 0.69 Miles Amount CrossedViewer Sensitivity - Moderate 1120 LOW 29.84 Miles Amount CrossedViewer Sensitivity - Moderate 1120 MODERATE 2.15 Miles Amount CrossedViewer Sensitivity - Moderate 1120.1 HIGH 0.43 Miles Amount CrossedViewer Sensitivity - Moderate 1120.1 MODERATE 1.62 Miles Amount CrossedViewer Sensitivity - Moderate 1120.2 HIGH 0.80 Miles Amount Crossed

Page 358: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

Viewer Sensitivity - Moderate 1120.2 MODERATE 2.23 Miles Amount CrossedViewer Sensitivity - Moderate 1180 HIGH 0.75 Miles Amount CrossedViewer Sensitivity - Moderate 1180 MODERATE 3.68 Miles Amount CrossedViewer Sensitivity - Moderate 1187 HIGH 4.55 Miles Amount CrossedViewer Sensitivity - Moderate 1187 LOW 31.93 Miles Amount CrossedViewer Sensitivity - Moderate 1187 MODERATE 8.89 Miles Amount CrossedViewer Sensitivity - Moderate 1190 HIGH 35.82 Miles Amount CrossedViewer Sensitivity - Moderate 1190 LOW 46.64 Miles Amount CrossedViewer Sensitivity - Moderate 1190 MODERATE 51.11 Miles Amount CrossedViewer Sensitivity - Moderate 1210 LOW 10.16 Miles Amount CrossedViewer Sensitivity - Moderate 1210 MODERATE 14.57 Miles Amount CrossedViewer Sensitivity - Moderate 1211 LOW 7.58 Miles Amount CrossedViewer Sensitivity - Moderate 1211 MODERATE 0.59 Miles Amount CrossedViewer Sensitivity - Moderate 1212 LOW 11.91 Miles Amount CrossedViewer Sensitivity - Moderate 1212 MODERATE 1.84 Miles Amount CrossedViewer Sensitivity - Moderate 1214 LOW 9.24 Miles Amount CrossedViewer Sensitivity - Moderate 1214 MODERATE 0.68 Miles Amount CrossedViewer Sensitivity - Moderate 1215 LOW 6.82 Miles Amount CrossedViewer Sensitivity - Moderate 1215 MODERATE 0.55 Miles Amount CrossedViewer Sensitivity - Moderate 1215.05 LOW 7.28 Miles Amount CrossedViewer Sensitivity - Moderate 1215.05 MODERATE 2.30 Miles Amount CrossedViewer Sensitivity - Moderate 1217.01 HIGH 10.81 Miles Amount CrossedViewer Sensitivity - Moderate 1217.01 LOW 52.01 Miles Amount CrossedViewer Sensitivity - Moderate 1217.01 MODERATE 14.00 Miles Amount CrossedViewer Sensitivity - Moderate 1217.02 LOW 15.34 Miles Amount CrossedViewer Sensitivity - Moderate 1217.02 MODERATE 0.68 Miles Amount CrossedViewer Sensitivity - Moderate 1217.051 HIGH 10.43 Miles Amount CrossedViewer Sensitivity - Moderate 1217.051 MODERATE 9.88 Miles Amount CrossedViewer Sensitivity - Moderate 1217.052 HIGH 11.35 Miles Amount CrossedViewer Sensitivity - Moderate 1217.052 MODERATE 4.47 Miles Amount CrossedViewer Sensitivity - Moderate 1217.1 HIGH 4.77 Miles Amount CrossedViewer Sensitivity - Moderate 1217.1 LOW 4.45 Miles Amount CrossedViewer Sensitivity - Moderate 1217.1 MODERATE 11.65 Miles Amount CrossedViewer Sensitivity - Moderate 1217.15 HIGH 10.25 Miles Amount CrossedViewer Sensitivity - Moderate 1217.15 LOW 5.45 Miles Amount CrossedViewer Sensitivity - Moderate 1217.15 MODERATE 20.67 Miles Amount CrossedViewer Sensitivity - Moderate 1218 LOW 11.83 Miles Amount CrossedViewer Sensitivity - Moderate 1218 MODERATE 0.14 Miles Amount CrossedViewer Sensitivity - Moderate 1219.1 MODERATE 0.60 Miles Amount CrossedViewer Sensitivity - Moderate 1219.2 HIGH 13.30 Miles Amount CrossedViewer Sensitivity - Moderate 1219.2 MODERATE 6.50 Miles Amount CrossedViewer Sensitivity - Moderate 1219.3 HIGH 1.47 Miles Amount CrossedViewer Sensitivity - Moderate 1219.4 MODERATE 0.94 Miles Amount CrossedViewer Sensitivity - Moderate 1219.45 MODERATE 1.60 Miles Amount CrossedViewer Sensitivity - Moderate 1219.5 HIGH 0.40 Miles Amount Crossed

Page 359: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

Viewer Sensitivity - Moderate 1219.5 MODERATE 16.43 Miles Amount CrossedViewer Sensitivity - Moderate 1219.6 LOW 0.59 Miles Amount CrossedViewer Sensitivity - Moderate 1219.6 MODERATE 3.98 Miles Amount CrossedViewer Sensitivity - Moderate 1220 HIGH 63.23 Miles Amount CrossedViewer Sensitivity - Moderate 1220 LOW 32.44 Miles Amount CrossedViewer Sensitivity - Moderate 1220 MODERATE 84.68 Miles Amount CrossedViewer Sensitivity - Moderate 1222.05 HIGH 5.91 Miles Amount CrossedViewer Sensitivity - Moderate 1222.05 LOW 14.42 Miles Amount CrossedViewer Sensitivity - Moderate 1222.05 MODERATE 20.85 Miles Amount CrossedViewer Sensitivity - Moderate 1222.3 LOW 12.27 Miles Amount CrossedViewer Sensitivity - Moderate 1222.3 MODERATE 1.91 Miles Amount CrossedViewer Sensitivity - Moderate 1223 LOW 13.70 Miles Amount CrossedViewer Sensitivity - Moderate 1223 MODERATE 4.46 Miles Amount CrossedViewer Sensitivity - Moderate 1225.2 HIGH 20.56 Miles Amount CrossedViewer Sensitivity - Moderate 1225.2 LOW 4.55 Miles Amount CrossedViewer Sensitivity - Moderate 1225.2 MODERATE 13.31 Miles Amount CrossedViewer Sensitivity - Moderate 1270 LOW 8.53 Miles Amount CrossedViewer Sensitivity - Moderate 1270 MODERATE 2.24 Miles Amount CrossedViewer Sensitivity - Moderate 1310 HIGH 17.72 Miles Amount CrossedViewer Sensitivity - Moderate 1310 LOW 8.52 Miles Amount CrossedViewer Sensitivity - Moderate 1310 MODERATE 24.02 Miles Amount CrossedViewer Sensitivity - Moderate 1320.05 HIGH 2.34 Miles Amount CrossedViewer Sensitivity - Moderate 1320.05 LOW 28.04 Miles Amount CrossedViewer Sensitivity - Moderate 1320.05 MODERATE 7.07 Miles Amount CrossedViewer Sensitivity - Moderate 1320.15 HIGH 9.75 Miles Amount CrossedViewer Sensitivity - Moderate 1320.15 LOW 6.60 Miles Amount CrossedViewer Sensitivity - Moderate 1320.15 MODERATE 11.63 Miles Amount CrossedViewer Sensitivity - Moderate 1320.2 HIGH 1.86 Miles Amount CrossedViewer Sensitivity - Moderate 1320.2 LOW 1.01 Miles Amount CrossedViewer Sensitivity - Moderate 1320.2 MODERATE 3.52 Miles Amount CrossedViewer Sensitivity - Moderate 1320.21 HIGH 0.27 Miles Amount CrossedViewer Sensitivity - Moderate 1321 LOW 28.47 Miles Amount CrossedViewer Sensitivity - Moderate 1321 MODERATE 3.09 Miles Amount CrossedViewer Sensitivity - Moderate 1322 LOW 3.16 Miles Amount CrossedViewer Sensitivity - Moderate 1322 MODERATE 3.84 Miles Amount CrossedViewer Sensitivity - Moderate 1322.5 HIGH 3.08 Miles Amount CrossedViewer Sensitivity - Moderate 1322.5 MODERATE 4.33 Miles Amount CrossedViewer Sensitivity - Moderate 1323 HIGH 2.33 Miles Amount CrossedViewer Sensitivity - Moderate 1323 LOW 7.21 Miles Amount CrossedViewer Sensitivity - Moderate 1323 MODERATE 12.11 Miles Amount CrossedViewer Sensitivity - Moderate 1324 HIGH 4.65 Miles Amount CrossedViewer Sensitivity - Moderate 1324.2 HIGH 4.69 Miles Amount CrossedViewer Sensitivity - Moderate 1324.4 HIGH 4.75 Miles Amount CrossedViewer Sensitivity - Moderate 1325 HIGH 6.52 Miles Amount CrossedViewer Sensitivity - Moderate 1325 MODERATE 2.57 Miles Amount Crossed

Page 360: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

Viewer Sensitivity - Moderate 1325.1 LOW 38.30 Miles Amount CrossedViewer Sensitivity - Moderate 1325.1 MODERATE 4.98 Miles Amount CrossedViewer Sensitivity - Moderate 1325.2 LOW 2.42 Miles Amount CrossedViewer Sensitivity - Moderate 1325.2 MODERATE 1.70 Miles Amount CrossedViewer Sensitivity - Moderate 1330.1 HIGH 20.05 Miles Amount CrossedViewer Sensitivity - Moderate 1330.1 LOW 36.62 Miles Amount CrossedViewer Sensitivity - Moderate 1330.1 MODERATE 42.26 Miles Amount CrossedViewer Sensitivity - Moderate 1340 HIGH 5.16 Miles Amount CrossedViewer Sensitivity - Moderate 1340 LOW 5.87 Miles Amount CrossedViewer Sensitivity - Moderate 1340 MODERATE 8.97 Miles Amount CrossedViewer Sensitivity - Moderate 1350 HIGH 6.98 Miles Amount CrossedViewer Sensitivity - Moderate 1350 MODERATE 7.74 Miles Amount CrossedViewer Sensitivity - Moderate 1360 HIGH 11.59 Miles Amount CrossedViewer Sensitivity - Moderate 1360 LOW 1.66 Miles Amount CrossedViewer Sensitivity - Moderate 1360 MODERATE 13.87 Miles Amount CrossedViewer Sensitivity - Moderate 1370 LOW 12.88 Miles Amount CrossedViewer Sensitivity - Moderate 1370 MODERATE 1.80 Miles Amount CrossedViewer Sensitivity - Moderate 1380 LOW 4.75 Miles Amount CrossedViewer Sensitivity - Moderate 1380 MODERATE 8.47 Miles Amount CrossedViewer Sensitivity - Moderate 1390 HIGH 0.94 Miles Amount CrossedViewer Sensitivity - Moderate 1390 LOW 0.70 Miles Amount CrossedViewer Sensitivity - Moderate 1390 MODERATE 2.00 Miles Amount CrossedViewer Sensitivity - Moderate 1400 HIGH 6.77 Miles Amount CrossedViewer Sensitivity - Moderate 1400 LOW 6.68 Miles Amount CrossedViewer Sensitivity - Moderate 1400 MODERATE 10.59 Miles Amount CrossedViewer Sensitivity - Moderate 1410 HIGH 17.85 Miles Amount CrossedViewer Sensitivity - Moderate 1410 LOW 0.12 Miles Amount CrossedViewer Sensitivity - Moderate 1410 MODERATE 20.19 Miles Amount CrossedViewer Sensitivity - Moderate 1420 MODERATE 7.95 Miles Amount CrossedViewer Sensitivity - Moderate 1430 HIGH 2.36 Miles Amount CrossedViewer Sensitivity - Moderate 1430 LOW 6.90 Miles Amount CrossedViewer Sensitivity - Moderate 1430 MODERATE 9.19 Miles Amount CrossedViewer Sensitivity - Moderate 1440 MODERATE 9.51 Miles Amount CrossedViewer Sensitivity - Moderate 1450 LOW 6.59 Miles Amount CrossedViewer Sensitivity - Moderate 1450 MODERATE 0.42 Miles Amount CrossedViewer Sensitivity - Moderate 1460 LOW 33.59 Miles Amount CrossedViewer Sensitivity - Moderate 1460 MODERATE 2.33 Miles Amount CrossedViewer Sensitivity - Moderate 1470 HIGH 2.33 Miles Amount CrossedViewer Sensitivity - Moderate 1470 LOW 27.90 Miles Amount CrossedViewer Sensitivity - Moderate 1470 MODERATE 8.47 Miles Amount CrossedViewer Sensitivity - Moderate 1480 HIGH 7.78 Miles Amount CrossedViewer Sensitivity - Moderate 1480 LOW 41.10 Miles Amount CrossedViewer Sensitivity - Moderate 1480 MODERATE 15.58 Miles Amount CrossedViewer Sensitivity - Moderate 1490 HIGH 1.37 Miles Amount CrossedViewer Sensitivity - Moderate 1490 MODERATE 12.73 Miles Amount Crossed

Page 361: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

Viewer Sensitivity - Moderate 1490.05 HIGH 36.89 Miles Amount CrossedViewer Sensitivity - Moderate 1490.05 MODERATE 5.49 Miles Amount CrossedViewer Sensitivity - Moderate 1495 HIGH 7.64 Miles Amount CrossedViewer Sensitivity - Moderate 1500 LOW 17.91 Miles Amount CrossedViewer Sensitivity - Moderate 1500 MODERATE 1.41 Miles Amount CrossedViewer Sensitivity - Moderate 1500.02 HIGH 0.89 Miles Amount CrossedViewer Sensitivity - Moderate 1500.02 LOW 7.47 Miles Amount CrossedViewer Sensitivity - Moderate 1500.02 MODERATE 10.25 Miles Amount CrossedViewer Sensitivity - Moderate 1500.05 HIGH 2.20 Miles Amount CrossedViewer Sensitivity - Moderate 1500.05 LOW 4.27 Miles Amount CrossedViewer Sensitivity - Moderate 1500.05 MODERATE 2.79 Miles Amount CrossedViewer Sensitivity - Moderate 1501.1 HIGH 5.27 Miles Amount CrossedViewer Sensitivity - Moderate 1501.1 LOW 3.64 Miles Amount CrossedViewer Sensitivity - Moderate 1501.1 MODERATE 5.26 Miles Amount CrossedViewer Sensitivity - Moderate 1501.15 LOW 1.04 Miles Amount CrossedViewer Sensitivity - Moderate 1502.5 HIGH 1.03 Miles Amount CrossedViewer Sensitivity - Moderate 1502.5 LOW 36.85 Miles Amount CrossedViewer Sensitivity - Moderate 1502.5 MODERATE 5.05 Miles Amount CrossedViewer Sensitivity - Moderate 1503 HIGH 1.59 Miles Amount CrossedViewer Sensitivity - Moderate 1503 LOW 0.55 Miles Amount CrossedViewer Sensitivity - Moderate 1503 MODERATE 4.46 Miles Amount CrossedViewer Sensitivity - Moderate 1503.5 LOW 0.65 Miles Amount CrossedViewer Sensitivity - Moderate 1504 HIGH 1.25 Miles Amount CrossedViewer Sensitivity - Moderate 1504 LOW 0.35 Miles Amount CrossedViewer Sensitivity - Moderate 1504 MODERATE 5.38 Miles Amount CrossedViewer Sensitivity - Moderate 1505 LOW 6.96 Miles Amount CrossedViewer Sensitivity - Moderate 1505 MODERATE 2.28 Miles Amount CrossedViewer Sensitivity - Moderate 1506 HIGH 19.08 Miles Amount CrossedViewer Sensitivity - Moderate 1506 MODERATE 9.48 Miles Amount CrossedViewer Sensitivity - Moderate 1510 HIGH 6.81 Miles Amount CrossedViewer Sensitivity - Moderate 1510 LOW 38.22 Miles Amount CrossedViewer Sensitivity - Moderate 1510 MODERATE 11.49 Miles Amount CrossedViewer Sensitivity - Moderate 1520 HIGH 29.55 Miles Amount CrossedViewer Sensitivity - Moderate 1520 LOW 56.28 Miles Amount CrossedViewer Sensitivity - Moderate 1520 MODERATE 38.93 Miles Amount CrossedViewer Sensitivity - Moderate 1530 LOW 7.00 Miles Amount CrossedViewer Sensitivity - Moderate 1540.1 LOW 21.85 Miles Amount CrossedViewer Sensitivity - Moderate 1540.1 MODERATE 0.62 Miles Amount CrossedViewer Sensitivity - Moderate 1540.2 LOW 11.51 Miles Amount CrossedViewer Sensitivity - Moderate 1540.2 MODERATE 7.29 Miles Amount CrossedViewer Sensitivity - Moderate 1545 HIGH 2.07 Miles Amount CrossedViewer Sensitivity - Moderate 1545 MODERATE 0.97 Miles Amount CrossedViewer Sensitivity - Moderate 1550.1 HIGH 5.54 Miles Amount CrossedViewer Sensitivity - Moderate 1550.1 LOW 6.37 Miles Amount CrossedViewer Sensitivity - Moderate 1550.1 MODERATE 13.07 Miles Amount Crossed

Page 362: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

Viewer Sensitivity - Moderate 1550.2 HIGH 0.91 Miles Amount CrossedViewer Sensitivity - Moderate 1550.2 LOW 2.32 Miles Amount CrossedViewer Sensitivity - Moderate 1550.2 MODERATE 8.75 Miles Amount CrossedViewer Sensitivity - Moderate 1560 HIGH 1.43 Miles Amount CrossedViewer Sensitivity - Moderate 1560 LOW 4.53 Miles Amount CrossedViewer Sensitivity - Moderate 1560 MODERATE 5.52 Miles Amount CrossedViewer Sensitivity - Moderate 1570 HIGH 3.52 Miles Amount CrossedViewer Sensitivity - Moderate 1570 MODERATE 6.19 Miles Amount CrossedViewer Sensitivity - Moderate 1580 LOW 3.62 Miles Amount CrossedViewer Sensitivity - Moderate 1590 LOW 5.55 Miles Amount CrossedViewer Sensitivity - Moderate 1590 MODERATE 1.47 Miles Amount CrossedViewer Sensitivity - Moderate 1600 LOW 5.49 Miles Amount CrossedViewer Sensitivity - Moderate 1610 LOW 16.61 Miles Amount CrossedViewer Sensitivity - Moderate 1610 MODERATE 2.73 Miles Amount CrossedViewer Sensitivity - Moderate 1620 LOW 4.57 Miles Amount CrossedViewer Sensitivity - Moderate 1620 MODERATE 1.60 Miles Amount CrossedViewer Sensitivity - Moderate 1630 LOW 2.61 Miles Amount CrossedViewer Sensitivity - Moderate 1630 MODERATE 1.48 Miles Amount CrossedViewer Sensitivity - Moderate 1640 LOW 0.52 Miles Amount CrossedViewer Sensitivity - Moderate 1640 MODERATE 2.48 Miles Amount CrossedViewer Sensitivity - Moderate 1650 HIGH 0.72 Miles Amount CrossedViewer Sensitivity - Moderate 1650 LOW 0.16 Miles Amount CrossedViewer Sensitivity - Moderate 1650 MODERATE 1.89 Miles Amount CrossedViewer Sensitivity - Moderate 1660 LOW 4.58 Miles Amount CrossedViewer Sensitivity - Moderate 1660 MODERATE 2.61 Miles Amount CrossedViewer Sensitivity - Moderate 1670 HIGH 2.83 Miles Amount CrossedViewer Sensitivity - Moderate 1670 MODERATE 1.97 Miles Amount CrossedViewer Sensitivity - Moderate 1680 HIGH 4.18 Miles Amount CrossedViewer Sensitivity - Moderate 1690 HIGH 0.61 Miles Amount CrossedViewer Sensitivity - Moderate 1690 MODERATE 4.81 Miles Amount CrossedViewer Sensitivity - Moderate 1700 LOW 0.52 Miles Amount CrossedViewer Sensitivity - Moderate 1700 MODERATE 1.18 Miles Amount CrossedViewer Sensitivity - Moderate 1710 HIGH 3.99 Miles Amount CrossedViewer Sensitivity - Moderate 1710 LOW 0.33 Miles Amount CrossedViewer Sensitivity - Moderate 1710 MODERATE 3.98 Miles Amount CrossedViewer Sensitivity - Moderate 1730 HIGH 0.29 Miles Amount CrossedViewer Sensitivity - Moderate 1730 LOW 1.57 Miles Amount CrossedViewer Sensitivity - Moderate 1730 MODERATE 6.20 Miles Amount CrossedViewer Sensitivity - Moderate 1740 LOW 4.72 Miles Amount CrossedViewer Sensitivity - Moderate 1740 MODERATE 0.13 Miles Amount CrossedViewer Sensitivity - Moderate 1750 MODERATE 0.42 Miles Amount CrossedViewer Sensitivity - Moderate 1760 LOW 4.50 Miles Amount CrossedViewer Sensitivity - Moderate 1760 MODERATE 3.81 Miles Amount CrossedViewer Sensitivity - Moderate 1771 LOW 18.01 Miles Amount CrossedViewer Sensitivity - Moderate 1771 MODERATE 3.27 Miles Amount Crossed

Page 363: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

Viewer Sensitivity - Moderate 1772 LOW 0.31 Miles Amount CrossedViewer Sensitivity - Moderate 1780 LOW 0.11 Miles Amount CrossedViewer Sensitivity - Moderate 1780 MODERATE 3.65 Miles Amount CrossedViewer Sensitivity - Moderate 1790 LOW 11.39 Miles Amount CrossedViewer Sensitivity - Moderate 1790 MODERATE 1.29 Miles Amount CrossedViewer Sensitivity - Moderate 1800 MODERATE 0.93 Miles Amount CrossedViewer Sensitivity - Moderate 1810 HIGH 0.63 Miles Amount CrossedViewer Sensitivity - Moderate 1810 LOW 3.32 Miles Amount CrossedViewer Sensitivity - Moderate 1810 MODERATE 4.02 Miles Amount CrossedViewer Sensitivity - Moderate 1820 LOW 5.80 Miles Amount CrossedViewer Sensitivity - Moderate 1820 MODERATE 1.29 Miles Amount CrossedViewer Sensitivity - Moderate 1830 LOW 0.46 Miles Amount CrossedViewer Sensitivity Buffer - High 1030 0 - 0.5 7.95 Miles Amount CrossedViewer Sensitivity Buffer - High 1030 0.5 - 2.5 12.81 Miles Amount CrossedViewer Sensitivity Buffer - High 1030 2.5 - 5 11.48 Miles Amount CrossedViewer Sensitivity Buffer - High 1040 >5 1.63 Miles Amount CrossedViewer Sensitivity Buffer - High 1040 0 - 0.5 0.68 Miles Amount CrossedViewer Sensitivity Buffer - High 1040 0.5 - 2.5 3.14 Miles Amount CrossedViewer Sensitivity Buffer - High 1040 2.5 - 5 3.72 Miles Amount CrossedViewer Sensitivity Buffer - High 1100 0 - 0.5 0.61 Miles Amount CrossedViewer Sensitivity Buffer - High 1100 0.5 - 2.5 10.04 Miles Amount CrossedViewer Sensitivity Buffer - High 1100 2.5 - 5 3.99 Miles Amount CrossedViewer Sensitivity Buffer - High 1101 2.5 - 5 0.80 Miles Amount CrossedViewer Sensitivity Buffer - High 1103 0.5 - 2.5 2.03 Miles Amount CrossedViewer Sensitivity Buffer - High 1103 2.5 - 5 0.86 Miles Amount CrossedViewer Sensitivity Buffer - High 1104 0 - 0.5 1.55 Miles Amount CrossedViewer Sensitivity Buffer - High 1104 0.5 - 2.5 2.40 Miles Amount CrossedViewer Sensitivity Buffer - High 1105 0 - 0.5 1.70 Miles Amount CrossedViewer Sensitivity Buffer - High 1105 0.5 - 2.5 3.09 Miles Amount CrossedViewer Sensitivity Buffer - High 1106 0.5 - 2.5 5.06 Miles Amount CrossedViewer Sensitivity Buffer - High 1106 2.5 - 5 0.60 Miles Amount CrossedViewer Sensitivity Buffer - High 1110 0.5 - 2.5 1.98 Miles Amount CrossedViewer Sensitivity Buffer - High 1110 2.5 - 5 4.98 Miles Amount CrossedViewer Sensitivity Buffer - High 1115 0 - 0.5 7.65 Miles Amount CrossedViewer Sensitivity Buffer - High 1115 0.5 - 2.5 38.22 Miles Amount CrossedViewer Sensitivity Buffer - High 1116 0 - 0.5 1.16 Miles Amount CrossedViewer Sensitivity Buffer - High 1116 0.5 - 2.5 6.24 Miles Amount CrossedViewer Sensitivity Buffer - High 1120 >5 6.45 Miles Amount CrossedViewer Sensitivity Buffer - High 1120 0 - 0.5 2.94 Miles Amount CrossedViewer Sensitivity Buffer - High 1120 0.5 - 2.5 10.16 Miles Amount CrossedViewer Sensitivity Buffer - High 1120 2.5 - 5 13.12 Miles Amount CrossedViewer Sensitivity Buffer - High 1120.1 0 - 0.5 0.28 Miles Amount CrossedViewer Sensitivity Buffer - High 1120.1 0.5 - 2.5 1.77 Miles Amount CrossedViewer Sensitivity Buffer - High 1120.2 0.5 - 2.5 3.04 Miles Amount CrossedViewer Sensitivity Buffer - High 1180 0 - 0.5 1.98 Miles Amount Crossed

Page 364: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

Viewer Sensitivity Buffer - High 1180 0.5 - 2.5 2.45 Miles Amount CrossedViewer Sensitivity Buffer - High 1187 >5 1.22 Miles Amount CrossedViewer Sensitivity Buffer - High 1187 0 - 0.5 3.24 Miles Amount CrossedViewer Sensitivity Buffer - High 1187 0.5 - 2.5 24.56 Miles Amount CrossedViewer Sensitivity Buffer - High 1187 2.5 - 5 16.34 Miles Amount CrossedViewer Sensitivity Buffer - High 1190 0 - 0.5 64.64 Miles Amount CrossedViewer Sensitivity Buffer - High 1190 0.5 - 2.5 57.21 Miles Amount CrossedViewer Sensitivity Buffer - High 1190 2.5 - 5 11.72 Miles Amount CrossedViewer Sensitivity Buffer - High 1210 0 - 0.5 1.27 Miles Amount CrossedViewer Sensitivity Buffer - High 1210 0.5 - 2.5 23.46 Miles Amount CrossedViewer Sensitivity Buffer - High 1211 0.5 - 2.5 1.75 Miles Amount CrossedViewer Sensitivity Buffer - High 1211 2.5 - 5 6.42 Miles Amount CrossedViewer Sensitivity Buffer - High 1212 >5 2.42 Miles Amount CrossedViewer Sensitivity Buffer - High 1212 0.5 - 2.5 3.68 Miles Amount CrossedViewer Sensitivity Buffer - High 1212 2.5 - 5 7.65 Miles Amount CrossedViewer Sensitivity Buffer - High 1214 0.5 - 2.5 5.36 Miles Amount CrossedViewer Sensitivity Buffer - High 1214 2.5 - 5 4.56 Miles Amount CrossedViewer Sensitivity Buffer - High 1215 >5 0.90 Miles Amount CrossedViewer Sensitivity Buffer - High 1215 0 - 0.5 0.91 Miles Amount CrossedViewer Sensitivity Buffer - High 1215 0.5 - 2.5 3.05 Miles Amount CrossedViewer Sensitivity Buffer - High 1215 2.5 - 5 2.51 Miles Amount CrossedViewer Sensitivity Buffer - High 1215.05 >5 7.00 Miles Amount CrossedViewer Sensitivity Buffer - High 1215.05 0.5 - 2.5 0.03 Miles Amount CrossedViewer Sensitivity Buffer - High 1215.05 2.5 - 5 2.54 Miles Amount CrossedViewer Sensitivity Buffer - High 1217.01 >5 27.68 Miles Amount CrossedViewer Sensitivity Buffer - High 1217.01 0 - 0.5 16.53 Miles Amount CrossedViewer Sensitivity Buffer - High 1217.01 0.5 - 2.5 22.33 Miles Amount CrossedViewer Sensitivity Buffer - High 1217.01 2.5 - 5 10.28 Miles Amount CrossedViewer Sensitivity Buffer - High 1217.02 0 - 0.5 1.48 Miles Amount CrossedViewer Sensitivity Buffer - High 1217.02 0.5 - 2.5 14.55 Miles Amount CrossedViewer Sensitivity Buffer - High 1217.051 0 - 0.5 5.35 Miles Amount CrossedViewer Sensitivity Buffer - High 1217.051 0.5 - 2.5 13.04 Miles Amount CrossedViewer Sensitivity Buffer - High 1217.051 2.5 - 5 1.91 Miles Amount CrossedViewer Sensitivity Buffer - High 1217.052 0 - 0.5 13.37 Miles Amount CrossedViewer Sensitivity Buffer - High 1217.052 0.5 - 2.5 2.45 Miles Amount CrossedViewer Sensitivity Buffer - High 1217.1 >5 0.58 Miles Amount CrossedViewer Sensitivity Buffer - High 1217.1 0 - 0.5 8.64 Miles Amount CrossedViewer Sensitivity Buffer - High 1217.1 0.5 - 2.5 5.86 Miles Amount CrossedViewer Sensitivity Buffer - High 1217.1 2.5 - 5 5.79 Miles Amount CrossedViewer Sensitivity Buffer - High 1217.15 0 - 0.5 12.95 Miles Amount CrossedViewer Sensitivity Buffer - High 1217.15 0.5 - 2.5 18.09 Miles Amount CrossedViewer Sensitivity Buffer - High 1217.15 2.5 - 5 5.32 Miles Amount CrossedViewer Sensitivity Buffer - High 1218 0 - 0.5 3.60 Miles Amount CrossedViewer Sensitivity Buffer - High 1218 0.5 - 2.5 8.32 Miles Amount CrossedViewer Sensitivity Buffer - High 1218 2.5 - 5 0.05 Miles Amount Crossed

Page 365: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

Viewer Sensitivity Buffer - High 1219.1 0 - 0.5 0.60 Miles Amount CrossedViewer Sensitivity Buffer - High 1219.2 0 - 0.5 18.10 Miles Amount CrossedViewer Sensitivity Buffer - High 1219.2 0.5 - 2.5 1.69 Miles Amount CrossedViewer Sensitivity Buffer - High 1219.3 0 - 0.5 1.47 Miles Amount CrossedViewer Sensitivity Buffer - High 1219.4 0 - 0.5 0.52 Miles Amount CrossedViewer Sensitivity Buffer - High 1219.4 0.5 - 2.5 0.42 Miles Amount CrossedViewer Sensitivity Buffer - High 1219.45 0 - 0.5 1.35 Miles Amount CrossedViewer Sensitivity Buffer - High 1219.45 0.5 - 2.5 0.25 Miles Amount CrossedViewer Sensitivity Buffer - High 1219.5 0 - 0.5 2.21 Miles Amount CrossedViewer Sensitivity Buffer - High 1219.5 0.5 - 2.5 14.62 Miles Amount CrossedViewer Sensitivity Buffer - High 1219.6 0 - 0.5 2.77 Miles Amount CrossedViewer Sensitivity Buffer - High 1219.6 0.5 - 2.5 1.79 Miles Amount CrossedViewer Sensitivity Buffer - High 1220 >5 10.38 Miles Amount CrossedViewer Sensitivity Buffer - High 1220 0 - 0.5 63.70 Miles Amount CrossedViewer Sensitivity Buffer - High 1220 0.5 - 2.5 94.20 Miles Amount CrossedViewer Sensitivity Buffer - High 1220 2.5 - 5 12.07 Miles Amount CrossedViewer Sensitivity Buffer - High 1222.05 0 - 0.5 11.25 Miles Amount CrossedViewer Sensitivity Buffer - High 1222.05 0.5 - 2.5 23.69 Miles Amount CrossedViewer Sensitivity Buffer - High 1222.05 2.5 - 5 6.22 Miles Amount CrossedViewer Sensitivity Buffer - High 1222.3 0 - 0.5 1.34 Miles Amount CrossedViewer Sensitivity Buffer - High 1222.3 0.5 - 2.5 4.99 Miles Amount CrossedViewer Sensitivity Buffer - High 1222.3 2.5 - 5 7.84 Miles Amount CrossedViewer Sensitivity Buffer - High 1223 0.5 - 2.5 3.77 Miles Amount CrossedViewer Sensitivity Buffer - High 1223 2.5 - 5 14.39 Miles Amount CrossedViewer Sensitivity Buffer - High 1225.2 0 - 0.5 6.58 Miles Amount CrossedViewer Sensitivity Buffer - High 1225.2 0.5 - 2.5 24.05 Miles Amount CrossedViewer Sensitivity Buffer - High 1225.2 2.5 - 5 7.78 Miles Amount CrossedViewer Sensitivity Buffer - High 1270 0 - 0.5 0.39 Miles Amount CrossedViewer Sensitivity Buffer - High 1270 0.5 - 2.5 10.39 Miles Amount CrossedViewer Sensitivity Buffer - High 1310 0 - 0.5 20.06 Miles Amount CrossedViewer Sensitivity Buffer - High 1310 0.5 - 2.5 29.79 Miles Amount CrossedViewer Sensitivity Buffer - High 1310 2.5 - 5 0.41 Miles Amount CrossedViewer Sensitivity Buffer - High 1320.05 0 - 0.5 15.88 Miles Amount CrossedViewer Sensitivity Buffer - High 1320.05 0.5 - 2.5 21.57 Miles Amount CrossedViewer Sensitivity Buffer - High 1320.15 0 - 0.5 11.72 Miles Amount CrossedViewer Sensitivity Buffer - High 1320.15 0.5 - 2.5 16.26 Miles Amount CrossedViewer Sensitivity Buffer - High 1320.2 0 - 0.5 1.74 Miles Amount CrossedViewer Sensitivity Buffer - High 1320.2 0.5 - 2.5 4.65 Miles Amount CrossedViewer Sensitivity Buffer - High 1320.21 0 - 0.5 0.27 Miles Amount CrossedViewer Sensitivity Buffer - High 1321 0 - 0.5 11.17 Miles Amount CrossedViewer Sensitivity Buffer - High 1321 0.5 - 2.5 20.40 Miles Amount CrossedViewer Sensitivity Buffer - High 1322 0 - 0.5 0.79 Miles Amount CrossedViewer Sensitivity Buffer - High 1322 0.5 - 2.5 6.21 Miles Amount CrossedViewer Sensitivity Buffer - High 1322.5 0 - 0.5 3.91 Miles Amount CrossedViewer Sensitivity Buffer - High 1322.5 0.5 - 2.5 3.50 Miles Amount Crossed

Page 366: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

Viewer Sensitivity Buffer - High 1323 0 - 0.5 11.24 Miles Amount CrossedViewer Sensitivity Buffer - High 1323 0.5 - 2.5 9.07 Miles Amount CrossedViewer Sensitivity Buffer - High 1323 2.5 - 5 1.34 Miles Amount CrossedViewer Sensitivity Buffer - High 1324 0 - 0.5 4.65 Miles Amount CrossedViewer Sensitivity Buffer - High 1324.2 0 - 0.5 4.69 Miles Amount CrossedViewer Sensitivity Buffer - High 1324.4 0 - 0.5 4.75 Miles Amount CrossedViewer Sensitivity Buffer - High 1325 0 - 0.5 7.52 Miles Amount CrossedViewer Sensitivity Buffer - High 1325 0.5 - 2.5 1.58 Miles Amount CrossedViewer Sensitivity Buffer - High 1325.1 0 - 0.5 25.88 Miles Amount CrossedViewer Sensitivity Buffer - High 1325.1 0.5 - 2.5 13.37 Miles Amount CrossedViewer Sensitivity Buffer - High 1325.1 2.5 - 5 4.02 Miles Amount CrossedViewer Sensitivity Buffer - High 1325.2 0 - 0.5 1.11 Miles Amount CrossedViewer Sensitivity Buffer - High 1325.2 0.5 - 2.5 3.01 Miles Amount CrossedViewer Sensitivity Buffer - High 1330.1 0 - 0.5 27.32 Miles Amount CrossedViewer Sensitivity Buffer - High 1330.1 0.5 - 2.5 53.04 Miles Amount CrossedViewer Sensitivity Buffer - High 1330.1 2.5 - 5 18.57 Miles Amount CrossedViewer Sensitivity Buffer - High 1340 0 - 0.5 8.87 Miles Amount CrossedViewer Sensitivity Buffer - High 1340 0.5 - 2.5 11.14 Miles Amount CrossedViewer Sensitivity Buffer - High 1350 0 - 0.5 3.79 Miles Amount CrossedViewer Sensitivity Buffer - High 1350 0.5 - 2.5 10.93 Miles Amount CrossedViewer Sensitivity Buffer - High 1360 >5 13.64 Miles Amount CrossedViewer Sensitivity Buffer - High 1360 0 - 0.5 0.75 Miles Amount CrossedViewer Sensitivity Buffer - High 1360 0.5 - 2.5 4.61 Miles Amount CrossedViewer Sensitivity Buffer - High 1360 2.5 - 5 8.11 Miles Amount CrossedViewer Sensitivity Buffer - High 1370 >5 3.76 Miles Amount CrossedViewer Sensitivity Buffer - High 1370 0 - 0.5 1.05 Miles Amount CrossedViewer Sensitivity Buffer - High 1370 0.5 - 2.5 4.28 Miles Amount CrossedViewer Sensitivity Buffer - High 1370 2.5 - 5 5.59 Miles Amount CrossedViewer Sensitivity Buffer - High 1380 0 - 0.5 1.83 Miles Amount CrossedViewer Sensitivity Buffer - High 1380 0.5 - 2.5 11.38 Miles Amount CrossedViewer Sensitivity Buffer - High 1390 0.5 - 2.5 2.77 Miles Amount CrossedViewer Sensitivity Buffer - High 1390 2.5 - 5 0.86 Miles Amount CrossedViewer Sensitivity Buffer - High 1400 0 - 0.5 2.56 Miles Amount CrossedViewer Sensitivity Buffer - High 1400 0.5 - 2.5 21.48 Miles Amount CrossedViewer Sensitivity Buffer - High 1410 0 - 0.5 3.24 Miles Amount CrossedViewer Sensitivity Buffer - High 1410 0.5 - 2.5 26.11 Miles Amount CrossedViewer Sensitivity Buffer - High 1410 2.5 - 5 8.81 Miles Amount CrossedViewer Sensitivity Buffer - High 1420 0.5 - 2.5 3.81 Miles Amount CrossedViewer Sensitivity Buffer - High 1420 2.5 - 5 4.14 Miles Amount CrossedViewer Sensitivity Buffer - High 1430 >5 1.00 Miles Amount CrossedViewer Sensitivity Buffer - High 1430 0 - 0.5 2.93 Miles Amount CrossedViewer Sensitivity Buffer - High 1430 0.5 - 2.5 5.69 Miles Amount CrossedViewer Sensitivity Buffer - High 1430 2.5 - 5 8.84 Miles Amount CrossedViewer Sensitivity Buffer - High 1440 0.5 - 2.5 9.51 Miles Amount CrossedViewer Sensitivity Buffer - High 1450 0.5 - 2.5 3.29 Miles Amount Crossed

Page 367: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

Viewer Sensitivity Buffer - High 1450 2.5 - 5 3.72 Miles Amount CrossedViewer Sensitivity Buffer - High 1460 >5 25.63 Miles Amount CrossedViewer Sensitivity Buffer - High 1460 2.5 - 5 10.30 Miles Amount CrossedViewer Sensitivity Buffer - High 1470 >5 26.30 Miles Amount CrossedViewer Sensitivity Buffer - High 1470 0 - 0.5 0.98 Miles Amount CrossedViewer Sensitivity Buffer - High 1470 0.5 - 2.5 4.03 Miles Amount CrossedViewer Sensitivity Buffer - High 1470 2.5 - 5 7.39 Miles Amount CrossedViewer Sensitivity Buffer - High 1480 >5 19.43 Miles Amount CrossedViewer Sensitivity Buffer - High 1480 0 - 0.5 2.13 Miles Amount CrossedViewer Sensitivity Buffer - High 1480 0.5 - 2.5 14.93 Miles Amount CrossedViewer Sensitivity Buffer - High 1480 2.5 - 5 27.98 Miles Amount CrossedViewer Sensitivity Buffer - High 1490 0.5 - 2.5 2.26 Miles Amount CrossedViewer Sensitivity Buffer - High 1490 2.5 - 5 11.84 Miles Amount CrossedViewer Sensitivity Buffer - High 1490.05 0 - 0.5 6.99 Miles Amount CrossedViewer Sensitivity Buffer - High 1490.05 0.5 - 2.5 28.80 Miles Amount CrossedViewer Sensitivity Buffer - High 1490.05 2.5 - 5 6.59 Miles Amount CrossedViewer Sensitivity Buffer - High 1495 >5 3.89 Miles Amount CrossedViewer Sensitivity Buffer - High 1495 0.5 - 2.5 1.22 Miles Amount CrossedViewer Sensitivity Buffer - High 1495 2.5 - 5 2.53 Miles Amount CrossedViewer Sensitivity Buffer - High 1500 >5 17.24 Miles Amount CrossedViewer Sensitivity Buffer - High 1500 2.5 - 5 2.08 Miles Amount CrossedViewer Sensitivity Buffer - High 1500.02 >5 4.24 Miles Amount CrossedViewer Sensitivity Buffer - High 1500.02 0 - 0.5 1.53 Miles Amount CrossedViewer Sensitivity Buffer - High 1500.02 0.5 - 2.5 10.34 Miles Amount CrossedViewer Sensitivity Buffer - High 1500.02 2.5 - 5 2.52 Miles Amount CrossedViewer Sensitivity Buffer - High 1500.05 0 - 0.5 6.38 Miles Amount CrossedViewer Sensitivity Buffer - High 1500.05 0.5 - 2.5 2.87 Miles Amount CrossedViewer Sensitivity Buffer - High 1501.1 0 - 0.5 14.16 Miles Amount CrossedViewer Sensitivity Buffer - High 1501.15 0 - 0.5 1.04 Miles Amount CrossedViewer Sensitivity Buffer - High 1502.5 >5 19.57 Miles Amount CrossedViewer Sensitivity Buffer - High 1502.5 0 - 0.5 2.84 Miles Amount CrossedViewer Sensitivity Buffer - High 1502.5 0.5 - 2.5 11.54 Miles Amount CrossedViewer Sensitivity Buffer - High 1502.5 2.5 - 5 8.98 Miles Amount CrossedViewer Sensitivity Buffer - High 1503 0 - 0.5 5.13 Miles Amount CrossedViewer Sensitivity Buffer - High 1503 0.5 - 2.5 1.47 Miles Amount CrossedViewer Sensitivity Buffer - High 1503.5 0 - 0.5 0.32 Miles Amount CrossedViewer Sensitivity Buffer - High 1503.5 0.5 - 2.5 0.33 Miles Amount CrossedViewer Sensitivity Buffer - High 1504 0 - 0.5 4.68 Miles Amount CrossedViewer Sensitivity Buffer - High 1504 0.5 - 2.5 2.31 Miles Amount CrossedViewer Sensitivity Buffer - High 1505 0 - 0.5 9.25 Miles Amount CrossedViewer Sensitivity Buffer - High 1506 0 - 0.5 13.59 Miles Amount CrossedViewer Sensitivity Buffer - High 1506 0.5 - 2.5 14.97 Miles Amount CrossedViewer Sensitivity Buffer - High 1510 >5 3.48 Miles Amount CrossedViewer Sensitivity Buffer - High 1510 0 - 0.5 6.30 Miles Amount CrossedViewer Sensitivity Buffer - High 1510 0.5 - 2.5 22.63 Miles Amount Crossed

Page 368: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

Viewer Sensitivity Buffer - High 1510 2.5 - 5 24.10 Miles Amount CrossedViewer Sensitivity Buffer - High 1520 >5 21.40 Miles Amount CrossedViewer Sensitivity Buffer - High 1520 0 - 0.5 43.29 Miles Amount CrossedViewer Sensitivity Buffer - High 1520 0.5 - 2.5 44.99 Miles Amount CrossedViewer Sensitivity Buffer - High 1520 2.5 - 5 15.08 Miles Amount CrossedViewer Sensitivity Buffer - High 1530 >5 5.01 Miles Amount CrossedViewer Sensitivity Buffer - High 1530 2.5 - 5 2.00 Miles Amount CrossedViewer Sensitivity Buffer - High 1540.1 0 - 0.5 1.06 Miles Amount CrossedViewer Sensitivity Buffer - High 1540.1 0.5 - 2.5 11.08 Miles Amount CrossedViewer Sensitivity Buffer - High 1540.1 2.5 - 5 10.33 Miles Amount CrossedViewer Sensitivity Buffer - High 1540.2 >5 2.53 Miles Amount CrossedViewer Sensitivity Buffer - High 1540.2 0 - 0.5 2.34 Miles Amount CrossedViewer Sensitivity Buffer - High 1540.2 0.5 - 2.5 3.86 Miles Amount CrossedViewer Sensitivity Buffer - High 1540.2 2.5 - 5 10.07 Miles Amount CrossedViewer Sensitivity Buffer - High 1545 0 - 0.5 1.52 Miles Amount CrossedViewer Sensitivity Buffer - High 1545 0.5 - 2.5 1.53 Miles Amount CrossedViewer Sensitivity Buffer - High 1550.1 0 - 0.5 1.03 Miles Amount CrossedViewer Sensitivity Buffer - High 1550.1 0.5 - 2.5 17.76 Miles Amount CrossedViewer Sensitivity Buffer - High 1550.1 2.5 - 5 6.20 Miles Amount CrossedViewer Sensitivity Buffer - High 1550.2 0 - 0.5 0.78 Miles Amount CrossedViewer Sensitivity Buffer - High 1550.2 0.5 - 2.5 4.20 Miles Amount CrossedViewer Sensitivity Buffer - High 1550.2 2.5 - 5 7.01 Miles Amount CrossedViewer Sensitivity Buffer - High 1560 0 - 0.5 2.68 Miles Amount CrossedViewer Sensitivity Buffer - High 1560 0.5 - 2.5 8.80 Miles Amount CrossedViewer Sensitivity Buffer - High 1570 0 - 0.5 3.04 Miles Amount CrossedViewer Sensitivity Buffer - High 1570 0.5 - 2.5 5.56 Miles Amount CrossedViewer Sensitivity Buffer - High 1570 2.5 - 5 1.11 Miles Amount CrossedViewer Sensitivity Buffer - High 1580 0.5 - 2.5 3.08 Miles Amount CrossedViewer Sensitivity Buffer - High 1580 2.5 - 5 0.54 Miles Amount CrossedViewer Sensitivity Buffer - High 1590 0 - 0.5 1.33 Miles Amount CrossedViewer Sensitivity Buffer - High 1590 0.5 - 2.5 5.69 Miles Amount CrossedViewer Sensitivity Buffer - High 1600 0.5 - 2.5 3.67 Miles Amount CrossedViewer Sensitivity Buffer - High 1600 2.5 - 5 1.83 Miles Amount CrossedViewer Sensitivity Buffer - High 1610 0 - 0.5 7.99 Miles Amount CrossedViewer Sensitivity Buffer - High 1610 0.5 - 2.5 6.05 Miles Amount CrossedViewer Sensitivity Buffer - High 1610 2.5 - 5 5.30 Miles Amount CrossedViewer Sensitivity Buffer - High 1620 0 - 0.5 1.95 Miles Amount CrossedViewer Sensitivity Buffer - High 1620 0.5 - 2.5 2.31 Miles Amount CrossedViewer Sensitivity Buffer - High 1620 2.5 - 5 1.92 Miles Amount CrossedViewer Sensitivity Buffer - High 1630 0 - 0.5 4.09 Miles Amount CrossedViewer Sensitivity Buffer - High 1640 0 - 0.5 3.00 Miles Amount CrossedViewer Sensitivity Buffer - High 1650 0 - 0.5 2.77 Miles Amount CrossedViewer Sensitivity Buffer - High 1660 0 - 0.5 7.19 Miles Amount CrossedViewer Sensitivity Buffer - High 1670 0 - 0.5 2.91 Miles Amount CrossedViewer Sensitivity Buffer - High 1670 0.5 - 2.5 1.88 Miles Amount Crossed

Page 369: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

Viewer Sensitivity Buffer - High 1680 0 - 0.5 3.36 Miles Amount CrossedViewer Sensitivity Buffer - High 1680 0.5 - 2.5 0.82 Miles Amount CrossedViewer Sensitivity Buffer - High 1690 0 - 0.5 4.71 Miles Amount CrossedViewer Sensitivity Buffer - High 1690 0.5 - 2.5 0.71 Miles Amount CrossedViewer Sensitivity Buffer - High 1700 0 - 0.5 1.70 Miles Amount CrossedViewer Sensitivity Buffer - High 1710 0 - 0.5 5.49 Miles Amount CrossedViewer Sensitivity Buffer - High 1710 0.5 - 2.5 2.82 Miles Amount CrossedViewer Sensitivity Buffer - High 1730 0 - 0.5 4.19 Miles Amount CrossedViewer Sensitivity Buffer - High 1730 0.5 - 2.5 3.87 Miles Amount CrossedViewer Sensitivity Buffer - High 1740 0 - 0.5 4.84 Miles Amount CrossedViewer Sensitivity Buffer - High 1750 0.5 - 2.5 0.42 Miles Amount CrossedViewer Sensitivity Buffer - High 1760 0 - 0.5 4.97 Miles Amount CrossedViewer Sensitivity Buffer - High 1760 0.5 - 2.5 3.35 Miles Amount CrossedViewer Sensitivity Buffer - High 1771 >5 4.11 Miles Amount CrossedViewer Sensitivity Buffer - High 1771 0 - 0.5 1.30 Miles Amount CrossedViewer Sensitivity Buffer - High 1771 0.5 - 2.5 9.90 Miles Amount CrossedViewer Sensitivity Buffer - High 1771 2.5 - 5 5.98 Miles Amount CrossedViewer Sensitivity Buffer - High 1772 2.5 - 5 0.31 Miles Amount CrossedViewer Sensitivity Buffer - High 1780 0 - 0.5 0.98 Miles Amount CrossedViewer Sensitivity Buffer - High 1780 0.5 - 2.5 2.78 Miles Amount CrossedViewer Sensitivity Buffer - High 1790 0 - 0.5 1.84 Miles Amount CrossedViewer Sensitivity Buffer - High 1790 0.5 - 2.5 5.51 Miles Amount CrossedViewer Sensitivity Buffer - High 1790 2.5 - 5 5.34 Miles Amount CrossedViewer Sensitivity Buffer - High 1800 0.5 - 2.5 0.93 Miles Amount CrossedViewer Sensitivity Buffer - High 1810 0.5 - 2.5 3.53 Miles Amount CrossedViewer Sensitivity Buffer - High 1810 2.5 - 5 4.44 Miles Amount CrossedViewer Sensitivity Buffer - High 1820 0.5 - 2.5 2.35 Miles Amount CrossedViewer Sensitivity Buffer - High 1820 2.5 - 5 4.74 Miles Amount CrossedViewer Sensitivity Buffer - High 1830 2.5 - 5 0.46 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1030 0 - 0.5 3.32 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1030 0.5 - 2.5 27.79 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1030 2.5 - 5 1.13 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1040 >5 2.45 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1040 0 - 0.5 0.70 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1040 0.5 - 2.5 3.12 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1040 2.5 - 5 2.90 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1100 0 - 0.5 5.74 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1100 0.5 - 2.5 8.90 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1101 0 - 0.5 0.67 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1101 0.5 - 2.5 0.13 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1103 0 - 0.5 2.88 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1104 0 - 0.5 3.94 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1105 0 - 0.5 1.20 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1105 0.5 - 2.5 3.59 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1106 0 - 0.5 2.16 Miles Amount Crossed

Page 370: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

Viewer Sensitivity Buffer - Moderate 1106 0.5 - 2.5 3.50 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1110 >5 4.50 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1110 2.5 - 5 2.46 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1115 >5 6.80 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1115 0.5 - 2.5 13.18 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1115 2.5 - 5 25.89 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1116 0.5 - 2.5 1.29 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1116 2.5 - 5 6.11 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1120 >5 17.26 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1120 0 - 0.5 0.69 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1120 0.5 - 2.5 6.39 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1120 2.5 - 5 8.34 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1120.1 0 - 0.5 0.43 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1120.1 0.5 - 2.5 1.62 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1120.2 0 - 0.5 0.80 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1120.2 0.5 - 2.5 2.23 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1180 0 - 0.5 0.75 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1180 0.5 - 2.5 3.68 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1187 >5 14.09 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1187 0 - 0.5 4.55 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1187 0.5 - 2.5 8.89 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1187 2.5 - 5 17.84 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1190 0 - 0.5 64.15 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1190 0.5 - 2.5 58.81 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1190 2.5 - 5 10.61 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1210 0 - 0.5 10.46 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1210 0.5 - 2.5 14.27 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1211 >5 5.01 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1211 0.5 - 2.5 0.59 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1211 2.5 - 5 2.57 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1212 >5 2.36 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1212 0 - 0.5 1.84 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1212 0.5 - 2.5 6.14 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1212 2.5 - 5 3.41 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1214 >5 6.35 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1214 0.5 - 2.5 0.68 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1214 2.5 - 5 2.89 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1215 >5 2.28 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1215 0 - 0.5 0.55 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1215 0.5 - 2.5 2.02 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1215 2.5 - 5 2.52 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1215.05 0 - 0.5 2.30 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1215.05 0.5 - 2.5 7.28 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1217.01 >5 23.75 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1217.01 0 - 0.5 18.47 Miles Amount Crossed

Page 371: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

Viewer Sensitivity Buffer - Moderate 1217.01 0.5 - 2.5 20.07 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1217.01 2.5 - 5 14.53 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1217.02 >5 5.77 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1217.02 0.5 - 2.5 0.68 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1217.02 2.5 - 5 9.57 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1217.051 0 - 0.5 10.43 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1217.051 0.5 - 2.5 9.88 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1217.052 0 - 0.5 11.35 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1217.052 0.5 - 2.5 4.47 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1217.1 0 - 0.5 11.40 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1217.1 0.5 - 2.5 7.85 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1217.1 2.5 - 5 1.62 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1217.15 0 - 0.5 10.25 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1217.15 0.5 - 2.5 22.44 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1217.15 2.5 - 5 3.69 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1218 >5 9.03 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1218 0.5 - 2.5 0.14 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1218 2.5 - 5 2.80 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1219.1 0.5 - 2.5 0.60 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1219.2 0 - 0.5 13.30 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1219.2 0.5 - 2.5 6.50 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1219.3 0 - 0.5 1.47 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1219.4 0.5 - 2.5 0.94 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1219.45 0.5 - 2.5 1.60 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1219.5 0 - 0.5 0.40 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1219.5 0.5 - 2.5 16.43 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1219.6 0.5 - 2.5 3.98 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1219.6 2.5 - 5 0.59 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1220 0 - 0.5 114.56 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1220 0.5 - 2.5 57.54 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1220 2.5 - 5 8.25 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1222.05 0 - 0.5 17.05 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1222.05 0.5 - 2.5 18.98 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1222.05 2.5 - 5 5.13 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1222.3 0 - 0.5 1.91 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1222.3 0.5 - 2.5 7.87 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1222.3 2.5 - 5 4.39 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1223 0 - 0.5 4.46 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1223 0.5 - 2.5 11.27 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1223 2.5 - 5 2.43 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1225.2 0 - 0.5 26.52 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1225.2 0.5 - 2.5 11.89 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1270 0 - 0.5 2.24 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1270 0.5 - 2.5 6.45 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1270 2.5 - 5 2.08 Miles Amount Crossed

Page 372: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

Viewer Sensitivity Buffer - Moderate 1310 0 - 0.5 17.72 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1310 0.5 - 2.5 24.02 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1310 2.5 - 5 8.52 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1320.05 >5 1.88 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1320.05 0 - 0.5 7.33 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1320.05 0.5 - 2.5 13.73 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1320.05 2.5 - 5 14.50 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1320.15 0 - 0.5 9.75 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1320.15 0.5 - 2.5 11.63 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1320.15 2.5 - 5 6.60 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1320.2 0 - 0.5 1.86 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1320.2 0.5 - 2.5 3.52 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1320.2 2.5 - 5 1.01 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1320.21 0 - 0.5 0.27 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1321 0 - 0.5 3.09 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1321 0.5 - 2.5 24.18 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1321 2.5 - 5 4.29 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1322 0 - 0.5 1.03 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1322 0.5 - 2.5 5.97 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1322.5 0 - 0.5 3.08 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1322.5 0.5 - 2.5 4.33 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1323 0 - 0.5 2.62 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1323 0.5 - 2.5 18.34 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1323 2.5 - 5 0.67 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1324 0 - 0.5 4.65 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1324.2 0 - 0.5 4.69 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1324.4 0 - 0.5 4.75 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1325 0 - 0.5 6.52 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1325 0.5 - 2.5 2.57 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1325.1 >5 16.90 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1325.1 0 - 0.5 3.45 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1325.1 0.5 - 2.5 14.40 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1325.1 2.5 - 5 8.53 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1325.2 0.5 - 2.5 1.70 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1325.2 2.5 - 5 2.42 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1330.1 0 - 0.5 48.94 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1330.1 0.5 - 2.5 45.67 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1330.1 2.5 - 5 4.32 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1340 0 - 0.5 9.99 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1340 0.5 - 2.5 8.31 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1340 2.5 - 5 1.70 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1350 0 - 0.5 6.98 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1350 0.5 - 2.5 7.74 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1360 0 - 0.5 11.59 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1360 0.5 - 2.5 13.87 Miles Amount Crossed

Page 373: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

Viewer Sensitivity Buffer - Moderate 1360 2.5 - 5 1.66 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1370 0 - 0.5 1.80 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1370 0.5 - 2.5 9.48 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1370 2.5 - 5 3.40 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1380 0 - 0.5 8.47 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1380 0.5 - 2.5 4.47 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1380 2.5 - 5 0.29 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1390 0 - 0.5 0.94 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1390 0.5 - 2.5 2.00 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1390 2.5 - 5 0.70 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1400 0 - 0.5 6.77 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1400 0.5 - 2.5 10.59 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1400 2.5 - 5 6.68 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1410 0 - 0.5 17.85 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1410 0.5 - 2.5 20.19 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1410 2.5 - 5 0.12 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1420 0 - 0.5 7.95 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1430 0 - 0.5 2.36 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1430 0.5 - 2.5 9.19 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1430 2.5 - 5 6.90 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1440 0 - 0.5 9.51 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1450 0 - 0.5 0.42 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1450 0.5 - 2.5 4.34 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1450 2.5 - 5 2.25 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1460 >5 9.78 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1460 0 - 0.5 2.33 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1460 0.5 - 2.5 8.17 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1460 2.5 - 5 15.64 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1470 >5 16.33 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1470 0 - 0.5 2.33 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1470 0.5 - 2.5 8.47 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1470 2.5 - 5 11.57 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1480 0 - 0.5 21.56 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1480 0.5 - 2.5 19.51 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1480 2.5 - 5 23.40 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1490 0 - 0.5 1.37 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1490 0.5 - 2.5 12.73 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1490.05 0 - 0.5 36.89 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1490.05 0.5 - 2.5 5.49 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1495 0 - 0.5 7.64 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1500 >5 3.29 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1500 0 - 0.5 1.41 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1500 0.5 - 2.5 7.35 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1500 2.5 - 5 7.27 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1500.02 0 - 0.5 11.15 Miles Amount Crossed

Page 374: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

Viewer Sensitivity Buffer - Moderate 1500.02 0.5 - 2.5 5.32 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1500.02 2.5 - 5 2.15 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1500.05 0 - 0.5 2.20 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1500.05 0.5 - 2.5 2.79 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1500.05 2.5 - 5 4.27 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1501.1 0 - 0.5 5.27 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1501.1 0.5 - 2.5 8.11 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1501.1 2.5 - 5 0.78 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1501.15 0.5 - 2.5 1.04 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1502.5 >5 30.52 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1502.5 0 - 0.5 1.03 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1502.5 0.5 - 2.5 5.05 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1502.5 2.5 - 5 6.33 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1503 0 - 0.5 1.59 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1503 0.5 - 2.5 4.46 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1503 2.5 - 5 0.55 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1503.5 2.5 - 5 0.65 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1504 0 - 0.5 1.25 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1504 0.5 - 2.5 5.38 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1504 2.5 - 5 0.35 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1505 0.5 - 2.5 2.28 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1505 2.5 - 5 6.96 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1506 0 - 0.5 19.08 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1506 0.5 - 2.5 9.48 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1510 >5 35.40 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1510 0 - 0.5 6.81 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1510 0.5 - 2.5 11.49 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1510 2.5 - 5 2.82 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1520 >5 34.57 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1520 0 - 0.5 29.55 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1520 0.5 - 2.5 38.93 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1520 2.5 - 5 21.71 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1530 >5 7.00 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1540.1 >5 3.20 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1540.1 0 - 0.5 0.62 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1540.1 0.5 - 2.5 14.14 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1540.1 2.5 - 5 4.51 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1540.2 0 - 0.5 7.29 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1540.2 0.5 - 2.5 11.32 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1540.2 2.5 - 5 0.19 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1545 0 - 0.5 3.05 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1550.1 >5 2.67 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1550.1 0 - 0.5 5.54 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1550.1 0.5 - 2.5 13.07 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1550.1 2.5 - 5 3.70 Miles Amount Crossed

Page 375: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

Viewer Sensitivity Buffer - Moderate 1550.2 0 - 0.5 0.91 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1550.2 0.5 - 2.5 8.75 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1550.2 2.5 - 5 2.32 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1560 0 - 0.5 1.43 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1560 0.5 - 2.5 5.52 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1560 2.5 - 5 4.53 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1570 0 - 0.5 3.52 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1570 0.5 - 2.5 6.19 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1580 0.5 - 2.5 3.26 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1580 2.5 - 5 0.36 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1590 0 - 0.5 1.47 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1590 0.5 - 2.5 5.55 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1600 0.5 - 2.5 2.34 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1600 2.5 - 5 3.15 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1610 0 - 0.5 2.73 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1610 0.5 - 2.5 10.42 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1610 2.5 - 5 6.19 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1620 0 - 0.5 1.60 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1620 0.5 - 2.5 4.57 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1630 0 - 0.5 1.48 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1630 0.5 - 2.5 2.61 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1640 0.5 - 2.5 3.00 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1650 0 - 0.5 1.05 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1650 0.5 - 2.5 1.72 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1660 0 - 0.5 2.61 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1660 0.5 - 2.5 4.58 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1670 0 - 0.5 2.83 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1670 0.5 - 2.5 1.97 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1680 0 - 0.5 4.18 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1690 0 - 0.5 0.61 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1690 0.5 - 2.5 4.81 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1700 0 - 0.5 1.18 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1700 0.5 - 2.5 0.52 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1710 0 - 0.5 7.41 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1710 0.5 - 2.5 0.90 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1730 0 - 0.5 0.29 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1730 0.5 - 2.5 6.20 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1730 2.5 - 5 1.57 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1740 0 - 0.5 0.13 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1740 0.5 - 2.5 4.72 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1750 0 - 0.5 0.42 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1760 0 - 0.5 3.81 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1760 0.5 - 2.5 4.50 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1771 0 - 0.5 3.27 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1771 0.5 - 2.5 16.33 Miles Amount Crossed

Page 376: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

Viewer Sensitivity Buffer - Moderate 1771 2.5 - 5 1.68 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1772 2.5 - 5 0.31 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1780 0 - 0.5 3.65 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1780 0.5 - 2.5 0.11 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1790 0 - 0.5 1.29 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1790 0.5 - 2.5 3.14 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1790 2.5 - 5 8.25 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1800 0 - 0.5 0.93 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1810 0 - 0.5 0.63 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1810 0.5 - 2.5 4.02 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1810 2.5 - 5 3.32 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1820 0 - 0.5 1.29 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1820 0.5 - 2.5 4.02 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1820 2.5 - 5 1.78 Miles Amount CrossedViewer Sensitivity Buffer - Moderate 1830 2.5 - 5 0.46 Miles Amount CrossedWater Erosion by HUC 1030 1018000210 0.01 Acres Construction DisturbanceWater Erosion by HUC 1030 1018000210 0.01 Acres Operation DisturbanceWater Erosion by HUC 1030 1018000213 7.36 Acres Construction DisturbanceWater Erosion by HUC 1030 1018000213 1.95 Acres Operation DisturbanceWater Erosion by HUC 1030 1404020013 15.21 Acres Construction DisturbanceWater Erosion by HUC 1030 1404020013 3.92 Acres Operation DisturbanceWater Erosion by HUC 1040 1404020004 0.00 Acres Construction DisturbanceWater Erosion by HUC 1040 1404020004 0.00 Acres Operation DisturbanceWater Erosion by HUC 1040 1404020013 1.99 Acres Construction DisturbanceWater Erosion by HUC 1040 1404020013 0.37 Acres Operation DisturbanceWater Erosion by HUC 1100 1405000205 0.82 Acres Construction DisturbanceWater Erosion by HUC 1100 1405000205 0.12 Acres Operation DisturbanceWater Erosion by HUC 1100 1405000206 3.34 Acres Construction DisturbanceWater Erosion by HUC 1100 1405000206 0.63 Acres Operation DisturbanceWater Erosion by HUC 1100 1405000505 0.01 Acres Construction DisturbanceWater Erosion by HUC 1100 1405000505 0.00 Acres Operation DisturbanceWater Erosion by HUC 1100 1405000701 50.05 Acres Construction DisturbanceWater Erosion by HUC 1100 1405000701 11.39 Acres Operation DisturbanceWater Erosion by HUC 1100 1405000704 1.87 Acres Construction DisturbanceWater Erosion by HUC 1100 1405000704 0.18 Acres Operation DisturbanceWater Erosion by HUC 1101 1405000205 1.79 Acres Construction DisturbanceWater Erosion by HUC 1101 1405000205 0.27 Acres Operation DisturbanceWater Erosion by HUC 1103 1405000205 0.86 Acres Construction DisturbanceWater Erosion by HUC 1103 1405000205 0.14 Acres Operation DisturbanceWater Erosion by HUC 1104 1405000205 8.53 Acres Construction DisturbanceWater Erosion by HUC 1104 1405000205 2.02 Acres Operation DisturbanceWater Erosion by HUC 1105 1405000205 11.21 Acres Construction DisturbanceWater Erosion by HUC 1105 1405000205 2.29 Acres Operation DisturbanceWater Erosion by HUC 1106 1405000205 12.48 Acres Construction DisturbanceWater Erosion by HUC 1106 1405000205 2.49 Acres Operation Disturbance

Page 377: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

Water Erosion by HUC 1106 1405000505 1.01 Acres Construction DisturbanceWater Erosion by HUC 1106 1405000505 0.57 Acres Operation DisturbanceWater Erosion by HUC 1106 1405000701 0.01 Acres Construction DisturbanceWater Erosion by HUC 1106 1405000701 0.00 Acres Operation DisturbanceWater Erosion by HUC 1110 1404020004 1.03 Acres Construction DisturbanceWater Erosion by HUC 1110 1404020004 0.21 Acres Operation DisturbanceWater Erosion by HUC 1110 1405000402 0.27 Acres Construction DisturbanceWater Erosion by HUC 1110 1405000402 0.06 Acres Operation DisturbanceWater Erosion by HUC 1115 1405000401 0.26 Acres Construction DisturbanceWater Erosion by HUC 1115 1405000401 0.05 Acres Operation DisturbanceWater Erosion by HUC 1115 1405000402 0.60 Acres Construction DisturbanceWater Erosion by HUC 1115 1405000402 0.12 Acres Operation DisturbanceWater Erosion by HUC 1115 1405000403 3.03 Acres Construction DisturbanceWater Erosion by HUC 1115 1405000403 0.60 Acres Operation DisturbanceWater Erosion by HUC 1120 1405000307 0.03 Acres Construction DisturbanceWater Erosion by HUC 1120 1405000307 0.01 Acres Operation DisturbanceWater Erosion by HUC 1120 1405000402 21.37 Acres Construction DisturbanceWater Erosion by HUC 1120 1405000402 4.36 Acres Operation DisturbanceWater Erosion by HUC 1187 1405000205 4.96 Acres Construction DisturbanceWater Erosion by HUC 1187 1405000205 1.37 Acres Operation DisturbanceWater Erosion by HUC 1187 1405000308 5.98 Acres Construction DisturbanceWater Erosion by HUC 1187 1405000308 1.72 Acres Operation DisturbanceWater Erosion by HUC 1187 1405000309 93.15 Acres Construction DisturbanceWater Erosion by HUC 1187 1405000309 25.78 Acres Operation DisturbanceWater Erosion by HUC 1187 1405000310 0.88 Acres Construction DisturbanceWater Erosion by HUC 1187 1405000310 0.38 Acres Operation DisturbanceWater Erosion by HUC 1187 1405000311 0.06 Acres Construction DisturbanceWater Erosion by HUC 1187 1405000311 0.03 Acres Operation DisturbanceWater Erosion by HUC 1190 1404020004 0.97 Acres Construction DisturbanceWater Erosion by HUC 1190 1404020004 0.34 Acres Operation DisturbanceWater Erosion by HUC 1190 1404020013 7.28 Acres Construction DisturbanceWater Erosion by HUC 1190 1404020013 2.02 Acres Operation DisturbanceWater Erosion by HUC 1190 1405000106 15.31 Acres Construction DisturbanceWater Erosion by HUC 1190 1405000106 3.32 Acres Operation DisturbanceWater Erosion by HUC 1190 1405000107 71.03 Acres Construction DisturbanceWater Erosion by HUC 1190 1405000107 14.72 Acres Operation DisturbanceWater Erosion by HUC 1190 1405000111 39.14 Acres Construction DisturbanceWater Erosion by HUC 1190 1405000111 7.78 Acres Operation DisturbanceWater Erosion by HUC 1190 1405000202 39.20 Acres Construction DisturbanceWater Erosion by HUC 1190 1405000202 8.34 Acres Operation DisturbanceWater Erosion by HUC 1190 1405000204 29.88 Acres Construction DisturbanceWater Erosion by HUC 1190 1405000204 6.69 Acres Operation DisturbanceWater Erosion by HUC 1190 1405000205 11.14 Acres Construction DisturbanceWater Erosion by HUC 1190 1405000205 2.56 Acres Operation DisturbanceWater Erosion by HUC 1190 1405000302 2.12 Acres Construction Disturbance

Page 378: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

Water Erosion by HUC 1190 1405000302 0.70 Acres Operation DisturbanceWater Erosion by HUC 1190 1405000305 53.07 Acres Construction DisturbanceWater Erosion by HUC 1190 1405000305 10.67 Acres Operation DisturbanceWater Erosion by HUC 1190 1405000401 0.67 Acres Construction DisturbanceWater Erosion by HUC 1190 1405000401 0.23 Acres Operation DisturbanceWater Erosion by HUC 1190 1405000402 0.56 Acres Construction DisturbanceWater Erosion by HUC 1190 1405000402 0.14 Acres Operation DisturbanceWater Erosion by HUC 1190 1405000403 18.05 Acres Construction DisturbanceWater Erosion by HUC 1190 1405000403 5.44 Acres Operation DisturbanceWater Erosion by HUC 1210 1405000704 42.31 Acres Construction DisturbanceWater Erosion by HUC 1210 1405000704 6.62 Acres Operation DisturbanceWater Erosion by HUC 1210 1405000705 14.76 Acres Construction DisturbanceWater Erosion by HUC 1210 1405000705 2.54 Acres Operation DisturbanceWater Erosion by HUC 1210 1406000102 0.74 Acres Construction DisturbanceWater Erosion by HUC 1210 1406000102 0.35 Acres Operation DisturbanceWater Erosion by HUC 1211 1406000102 30.61 Acres Construction DisturbanceWater Erosion by HUC 1211 1406000102 7.13 Acres Operation DisturbanceWater Erosion by HUC 1212 1405000710 0.00 Acres Construction DisturbanceWater Erosion by HUC 1212 1405000710 0.00 Acres Operation DisturbanceWater Erosion by HUC 1212 1406000102 3.66 Acres Construction DisturbanceWater Erosion by HUC 1212 1406000102 1.36 Acres Operation DisturbanceWater Erosion by HUC 1212 1406000105 76.13 Acres Construction DisturbanceWater Erosion by HUC 1212 1406000105 30.56 Acres Operation DisturbanceWater Erosion by HUC 1214 1406000102 16.39 Acres Construction DisturbanceWater Erosion by HUC 1214 1406000102 3.97 Acres Operation DisturbanceWater Erosion by HUC 1215 1405000710 34.11 Acres Construction DisturbanceWater Erosion by HUC 1215 1405000710 7.59 Acres Operation DisturbanceWater Erosion by HUC 1215 1406000102 1.84 Acres Construction DisturbanceWater Erosion by HUC 1215 1406000102 0.40 Acres Operation DisturbanceWater Erosion by HUC 1215 1406000105 5.66 Acres Construction DisturbanceWater Erosion by HUC 1215 1406000105 1.32 Acres Operation DisturbanceWater Erosion by HUC 1215.05 1405000710 19.88 Acres Construction DisturbanceWater Erosion by HUC 1215.05 1405000710 5.30 Acres Operation DisturbanceWater Erosion by HUC 1215.05 1405000711 15.09 Acres Construction DisturbanceWater Erosion by HUC 1215.05 1405000711 4.49 Acres Operation DisturbanceWater Erosion by HUC 1215.05 1406000105 20.37 Acres Construction DisturbanceWater Erosion by HUC 1215.05 1406000105 6.32 Acres Operation DisturbanceWater Erosion by HUC 1217.01 1405000710 24.00 Acres Construction DisturbanceWater Erosion by HUC 1217.01 1405000710 5.79 Acres Operation DisturbanceWater Erosion by HUC 1217.02 1406000503 1.64 Acres Construction DisturbanceWater Erosion by HUC 1217.02 1406000503 0.75 Acres Operation DisturbanceWater Erosion by HUC 1217.02 1406000703 0.30 Acres Construction DisturbanceWater Erosion by HUC 1217.02 1406000703 0.19 Acres Operation DisturbanceWater Erosion by HUC 1217.02 1406000708 0.07 Acres Construction DisturbanceWater Erosion by HUC 1217.02 1406000708 0.05 Acres Operation Disturbance

Page 379: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

Water Erosion by HUC 1217.1 1406000703 17.15 Acres Construction DisturbanceWater Erosion by HUC 1217.1 1406000703 5.58 Acres Operation DisturbanceWater Erosion by HUC 1217.1 1406000704 1.93 Acres Construction DisturbanceWater Erosion by HUC 1217.1 1406000704 0.51 Acres Operation DisturbanceWater Erosion by HUC 1217.1 1406000705 19.96 Acres Construction DisturbanceWater Erosion by HUC 1217.1 1406000705 4.83 Acres Operation DisturbanceWater Erosion by HUC 1217.15 1406000702 5.35 Acres Construction DisturbanceWater Erosion by HUC 1217.15 1406000702 1.61 Acres Operation DisturbanceWater Erosion by HUC 1217.15 1406000704 0.41 Acres Construction DisturbanceWater Erosion by HUC 1217.15 1406000704 0.20 Acres Operation DisturbanceWater Erosion by HUC 1217.15 1602020101 3.12 Acres Construction DisturbanceWater Erosion by HUC 1217.15 1602020101 1.49 Acres Operation DisturbanceWater Erosion by HUC 1217.15 1602020202 0.77 Acres Construction DisturbanceWater Erosion by HUC 1217.15 1602020202 0.49 Acres Operation DisturbanceWater Erosion by HUC 1217.15 1603000401 28.21 Acres Construction DisturbanceWater Erosion by HUC 1217.15 1603000401 10.05 Acres Operation DisturbanceWater Erosion by HUC 1217.15 1603000402 40.13 Acres Construction DisturbanceWater Erosion by HUC 1217.15 1603000402 14.33 Acres Operation DisturbanceWater Erosion by HUC 1220 1401000517 63.41 Acres Construction DisturbanceWater Erosion by HUC 1220 1401000517 16.75 Acres Operation DisturbanceWater Erosion by HUC 1220 1401000519 5.35 Acres Construction DisturbanceWater Erosion by HUC 1220 1401000519 1.59 Acres Operation DisturbanceWater Erosion by HUC 1220 1403000101 24.25 Acres Construction DisturbanceWater Erosion by HUC 1220 1403000101 6.78 Acres Operation DisturbanceWater Erosion by HUC 1220 1403000102 19.33 Acres Construction DisturbanceWater Erosion by HUC 1220 1403000102 5.56 Acres Operation DisturbanceWater Erosion by HUC 1220 1403000104 6.82 Acres Construction DisturbanceWater Erosion by HUC 1220 1403000104 2.08 Acres Operation DisturbanceWater Erosion by HUC 1220 1403000106 7.75 Acres Construction DisturbanceWater Erosion by HUC 1220 1403000106 2.27 Acres Operation DisturbanceWater Erosion by HUC 1220 1403000107 35.23 Acres Construction DisturbanceWater Erosion by HUC 1220 1403000107 10.35 Acres Operation DisturbanceWater Erosion by HUC 1220 1403000108 17.05 Acres Construction DisturbanceWater Erosion by HUC 1220 1403000108 4.94 Acres Operation DisturbanceWater Erosion by HUC 1220 1403000501 4.56 Acres Construction DisturbanceWater Erosion by HUC 1220 1403000501 1.19 Acres Operation DisturbanceWater Erosion by HUC 1220 1405000701 2.05 Acres Construction DisturbanceWater Erosion by HUC 1220 1405000701 0.57 Acres Operation DisturbanceWater Erosion by HUC 1220 1405000704 14.82 Acres Construction DisturbanceWater Erosion by HUC 1220 1405000704 2.79 Acres Operation DisturbanceWater Erosion by HUC 1220 1405000706 1.22 Acres Construction DisturbanceWater Erosion by HUC 1220 1405000706 0.36 Acres Operation DisturbanceWater Erosion by HUC 1220 1405000709 0.80 Acres Construction DisturbanceWater Erosion by HUC 1220 1405000709 0.17 Acres Operation DisturbanceWater Erosion by HUC 1220 1406000801 3.17 Acres Construction Disturbance

Page 380: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

Water Erosion by HUC 1220 1406000801 0.99 Acres Operation DisturbanceWater Erosion by HUC 1220 1406000802 0.67 Acres Construction DisturbanceWater Erosion by HUC 1220 1406000802 0.20 Acres Operation DisturbanceWater Erosion by HUC 1220 1406000803 36.74 Acres Construction DisturbanceWater Erosion by HUC 1220 1406000803 9.76 Acres Operation DisturbanceWater Erosion by HUC 1220 1406000804 28.83 Acres Construction DisturbanceWater Erosion by HUC 1220 1406000804 6.85 Acres Operation DisturbanceWater Erosion by HUC 1220 1406000805 3.20 Acres Construction DisturbanceWater Erosion by HUC 1220 1406000805 1.02 Acres Operation DisturbanceWater Erosion by HUC 1222.05 1406000707 68.77 Acres Construction DisturbanceWater Erosion by HUC 1222.05 1406000707 11.10 Acres Operation DisturbanceWater Erosion by HUC 1222.05 1406000708 7.76 Acres Construction DisturbanceWater Erosion by HUC 1222.05 1406000708 1.43 Acres Operation DisturbanceWater Erosion by HUC 1222.05 1406000709 10.67 Acres Construction DisturbanceWater Erosion by HUC 1222.05 1406000709 2.25 Acres Operation DisturbanceWater Erosion by HUC 1222.05 1406000710 0.07 Acres Construction DisturbanceWater Erosion by HUC 1222.05 1406000710 0.02 Acres Operation DisturbanceWater Erosion by HUC 1222.05 1406000711 22.38 Acres Construction DisturbanceWater Erosion by HUC 1222.05 1406000711 4.48 Acres Operation DisturbanceWater Erosion by HUC 1222.3 1406000707 3.02 Acres Construction DisturbanceWater Erosion by HUC 1222.3 1406000707 0.89 Acres Operation DisturbanceWater Erosion by HUC 1222.3 1406000901 14.94 Acres Construction DisturbanceWater Erosion by HUC 1222.3 1406000901 3.88 Acres Operation DisturbanceWater Erosion by HUC 1223 1406000704 17.93 Acres Construction DisturbanceWater Erosion by HUC 1223 1406000704 4.04 Acres Operation DisturbanceWater Erosion by HUC 1223 1406000706 0.21 Acres Construction DisturbanceWater Erosion by HUC 1223 1406000706 0.11 Acres Operation DisturbanceWater Erosion by HUC 1223 1406000707 3.67 Acres Construction DisturbanceWater Erosion by HUC 1223 1406000707 1.44 Acres Operation DisturbanceWater Erosion by HUC 1223 1406000708 0.66 Acres Construction DisturbanceWater Erosion by HUC 1223 1406000708 0.28 Acres Operation DisturbanceWater Erosion by HUC 1225.2 1406000711 50.85 Acres Construction DisturbanceWater Erosion by HUC 1225.2 1406000711 9.12 Acres Operation DisturbanceWater Erosion by HUC 1225.2 1406000801 29.61 Acres Construction DisturbanceWater Erosion by HUC 1225.2 1406000801 6.42 Acres Operation DisturbanceWater Erosion by HUC 1225.2 1406000901 27.72 Acres Construction DisturbanceWater Erosion by HUC 1225.2 1406000901 6.06 Acres Operation DisturbanceWater Erosion by HUC 1225.2 1406000902 0.55 Acres Construction DisturbanceWater Erosion by HUC 1225.2 1406000902 0.18 Acres Operation DisturbanceWater Erosion by HUC 1225.2 1406000905 34.00 Acres Construction DisturbanceWater Erosion by HUC 1225.2 1406000905 6.84 Acres Operation DisturbanceWater Erosion by HUC 1270 1406000901 52.61 Acres Construction DisturbanceWater Erosion by HUC 1270 1406000901 10.15 Acres Operation DisturbanceWater Erosion by HUC 1270 1406000902 1.64 Acres Construction DisturbanceWater Erosion by HUC 1270 1406000902 0.47 Acres Operation Disturbance

Page 381: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

Water Erosion by HUC 1310 1406000901 21.04 Acres Construction DisturbanceWater Erosion by HUC 1310 1406000901 4.85 Acres Operation DisturbanceWater Erosion by HUC 1310 1602020101 0.70 Acres Construction DisturbanceWater Erosion by HUC 1310 1602020101 0.46 Acres Operation DisturbanceWater Erosion by HUC 1310 1603000401 3.17 Acres Construction DisturbanceWater Erosion by HUC 1310 1603000401 1.03 Acres Operation DisturbanceWater Erosion by HUC 1310 1603000402 39.98 Acres Construction DisturbanceWater Erosion by HUC 1310 1603000402 13.01 Acres Operation DisturbanceWater Erosion by HUC 1320.05 1406000105 3.60 Acres Construction DisturbanceWater Erosion by HUC 1320.05 1406000105 0.72 Acres Operation DisturbanceWater Erosion by HUC 1320.05 1406000106 5.85 Acres Construction DisturbanceWater Erosion by HUC 1320.05 1406000106 1.06 Acres Operation DisturbanceWater Erosion by HUC 1320.05 1406000310 3.15 Acres Construction DisturbanceWater Erosion by HUC 1320.05 1406000310 0.47 Acres Operation DisturbanceWater Erosion by HUC 1320.05 1406000314 0.16 Acres Construction DisturbanceWater Erosion by HUC 1320.05 1406000314 0.05 Acres Operation DisturbanceWater Erosion by HUC 1320.15 1602020101 16.45 Acres Construction DisturbanceWater Erosion by HUC 1320.15 1602020101 5.98 Acres Operation DisturbanceWater Erosion by HUC 1320.15 1602020201 18.62 Acres Construction DisturbanceWater Erosion by HUC 1320.15 1602020201 6.65 Acres Operation DisturbanceWater Erosion by HUC 1320.15 1602020202 64.83 Acres Construction DisturbanceWater Erosion by HUC 1320.15 1602020202 28.03 Acres Operation DisturbanceWater Erosion by HUC 1320.2 1602020101 15.54 Acres Construction DisturbanceWater Erosion by HUC 1320.2 1602020101 6.98 Acres Operation DisturbanceWater Erosion by HUC 1320.2 1603000401 0.00 Acres Construction DisturbanceWater Erosion by HUC 1320.2 1603000401 0.00 Acres Operation DisturbanceWater Erosion by HUC 1330.1 1406000901 0.79 Acres Construction DisturbanceWater Erosion by HUC 1330.1 1406000901 0.08 Acres Operation DisturbanceWater Erosion by HUC 1330.1 1406000902 40.52 Acres Construction DisturbanceWater Erosion by HUC 1330.1 1406000902 10.77 Acres Operation DisturbanceWater Erosion by HUC 1330.1 1406000903 33.42 Acres Construction DisturbanceWater Erosion by HUC 1330.1 1406000903 11.96 Acres Operation DisturbanceWater Erosion by HUC 1330.1 1406000904 44.40 Acres Construction DisturbanceWater Erosion by HUC 1330.1 1406000904 9.58 Acres Operation DisturbanceWater Erosion by HUC 1330.1 1407000201 32.77 Acres Construction DisturbanceWater Erosion by HUC 1330.1 1407000201 9.27 Acres Operation DisturbanceWater Erosion by HUC 1330.1 1407000202 16.71 Acres Construction DisturbanceWater Erosion by HUC 1330.1 1407000202 4.68 Acres Operation DisturbanceWater Erosion by HUC 1330.1 1603000305 26.78 Acres Construction DisturbanceWater Erosion by HUC 1330.1 1603000305 7.23 Acres Operation DisturbanceWater Erosion by HUC 1330.1 1603000501 0.46 Acres Construction DisturbanceWater Erosion by HUC 1330.1 1603000501 0.06 Acres Operation DisturbanceWater Erosion by HUC 1380 1603000512 9.51 Acres Construction DisturbanceWater Erosion by HUC 1380 1603000512 1.08 Acres Operation DisturbanceWater Erosion by HUC 1400 1603000501 1.81 Acres Construction Disturbance

Page 382: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

Water Erosion by HUC 1400 1603000501 0.39 Acres Operation DisturbanceWater Erosion by HUC 1400 1603000504 0.73 Acres Construction DisturbanceWater Erosion by HUC 1400 1603000504 0.21 Acres Operation DisturbanceWater Erosion by HUC 1410 1603000501 7.35 Acres Construction DisturbanceWater Erosion by HUC 1410 1603000501 1.10 Acres Operation DisturbanceWater Erosion by HUC 1410 1603000512 0.02 Acres Construction DisturbanceWater Erosion by HUC 1410 1603000512 0.01 Acres Operation DisturbanceWater Erosion by HUC 1410 1603000514 5.58 Acres Construction DisturbanceWater Erosion by HUC 1410 1603000514 0.90 Acres Operation DisturbanceWater Erosion by HUC 1490.05 1603000610 1.25 Acres Construction DisturbanceWater Erosion by HUC 1490.05 1603000610 0.26 Acres Operation DisturbanceWater Erosion by HUC 1500.05 1603000613 7.86 Acres Construction DisturbanceWater Erosion by HUC 1500.05 1603000613 2.05 Acres Operation DisturbanceWater Erosion by HUC 1502.5 1501000808 7.54 Acres Construction DisturbanceWater Erosion by HUC 1502.5 1501000808 1.43 Acres Operation DisturbanceWater Erosion by HUC 1502.5 1501001005 1.32 Acres Construction DisturbanceWater Erosion by HUC 1502.5 1501001005 0.74 Acres Operation DisturbanceWater Erosion by HUC 1502.5 1501001006 0.02 Acres Construction DisturbanceWater Erosion by HUC 1502.5 1501001006 0.01 Acres Operation DisturbanceWater Erosion by HUC 1504 1603000613 0.76 Acres Construction DisturbanceWater Erosion by HUC 1504 1603000613 0.23 Acres Operation DisturbanceWater Erosion by HUC 1510 1501001305 2.36 Acres Construction DisturbanceWater Erosion by HUC 1510 1501001305 0.60 Acres Operation DisturbanceWater Erosion by HUC 1510 1603000610 0.02 Acres Construction DisturbanceWater Erosion by HUC 1510 1603000610 0.01 Acres Operation DisturbanceWater Erosion by HUC 1520 1501001203 0.31 Acres Construction DisturbanceWater Erosion by HUC 1520 1501001203 0.14 Acres Operation DisturbanceWater Erosion by HUC 1520 1501001204 1.83 Acres Construction DisturbanceWater Erosion by HUC 1520 1501001204 0.77 Acres Operation DisturbanceWater Erosion by HUC 1520 1501001206 5.60 Acres Construction DisturbanceWater Erosion by HUC 1520 1501001206 1.69 Acres Operation DisturbanceWater Erosion by HUC 1520 1501001305 3.62 Acres Construction DisturbanceWater Erosion by HUC 1520 1501001305 0.86 Acres Operation DisturbanceWater Erosion by HUC 1520 1501001306 43.97 Acres Construction DisturbanceWater Erosion by HUC 1520 1501001306 9.44 Acres Operation DisturbanceWater Erosion by HUC 1520 1501001307 0.95 Acres Construction DisturbanceWater Erosion by HUC 1520 1501001307 0.42 Acres Operation DisturbanceWater Erosion by HUC 1520 1606000909 1.12 Acres Construction DisturbanceWater Erosion by HUC 1520 1606000909 0.25 Acres Operation DisturbanceWater Erosion by HUC 1530 1501001005 6.55 Acres Construction DisturbanceWater Erosion by HUC 1530 1501001005 1.46 Acres Operation DisturbanceWater Erosion by HUC 1540.1 1501001005 1.03 Acres Construction DisturbanceWater Erosion by HUC 1540.1 1501001005 0.06 Acres Operation DisturbanceWater Erosion by HUC 1540.1 1501001007 0.00 Acres Construction DisturbanceWater Erosion by HUC 1540.1 1501001007 0.00 Acres Operation Disturbance

Page 383: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

Water Erosion by HUC 1540.1 1501001209 1.40 Acres Construction DisturbanceWater Erosion by HUC 1540.1 1501001209 0.47 Acres Operation DisturbanceWater Erosion by HUC 1540.2 1501001206 1.47 Acres Construction DisturbanceWater Erosion by HUC 1540.2 1501001206 0.13 Acres Operation DisturbanceWater Erosion by HUC 1540.2 1501001207 2.32 Acres Construction DisturbanceWater Erosion by HUC 1540.2 1501001207 0.34 Acres Operation DisturbanceWater Erosion by HUC 1540.2 1501001208 0.19 Acres Construction DisturbanceWater Erosion by HUC 1540.2 1501001208 0.03 Acres Operation DisturbanceWater Erosion by HUC 1540.2 1501001309 0.06 Acres Construction DisturbanceWater Erosion by HUC 1540.2 1501001309 0.00 Acres Operation DisturbanceWater Erosion by HUC 1545 1501001207 0.03 Acres Construction DisturbanceWater Erosion by HUC 1545 1501001207 0.01 Acres Operation DisturbanceWater Erosion by HUC 1545 1501001208 0.24 Acres Construction DisturbanceWater Erosion by HUC 1545 1501001208 0.04 Acres Operation DisturbanceWater Erosion by HUC 1545 1501001309 0.05 Acres Construction DisturbanceWater Erosion by HUC 1545 1501001309 0.01 Acres Operation DisturbanceWater Erosion by HUC 1550.1 1501001005 3.72 Acres Construction DisturbanceWater Erosion by HUC 1550.1 1501001005 0.94 Acres Operation DisturbanceWater Erosion by HUC 1550.1 1501001007 1.00 Acres Construction DisturbanceWater Erosion by HUC 1550.1 1501001007 0.25 Acres Operation DisturbanceWater Erosion by HUC 1550.1 1501001208 4.08 Acres Construction DisturbanceWater Erosion by HUC 1550.1 1501001208 1.06 Acres Operation DisturbanceWater Erosion by HUC 1550.1 1501001209 68.97 Acres Construction DisturbanceWater Erosion by HUC 1550.1 1501001209 19.79 Acres Operation DisturbanceWater Erosion by HUC 1550.2 1501001207 10.90 Acres Construction DisturbanceWater Erosion by HUC 1550.2 1501001207 2.44 Acres Operation DisturbanceWater Erosion by HUC 1550.2 1501001208 0.56 Acres Construction DisturbanceWater Erosion by HUC 1550.2 1501001208 0.13 Acres Operation DisturbanceWater Erosion by HUC 1550.2 1501001209 0.02 Acres Construction DisturbanceWater Erosion by HUC 1550.2 1501001209 0.01 Acres Operation DisturbanceWater Erosion by HUC 1560 1501001207 0.63 Acres Construction DisturbanceWater Erosion by HUC 1560 1501001207 0.13 Acres Operation DisturbanceWater Erosion by HUC 1570 1501001206 0.48 Acres Construction DisturbanceWater Erosion by HUC 1570 1501001206 0.09 Acres Operation DisturbanceWater Erosion by HUC 1570 1501001207 1.23 Acres Construction DisturbanceWater Erosion by HUC 1570 1501001207 0.24 Acres Operation DisturbanceWater Erosion by HUC 1580 1501001206 0.10 Acres Construction DisturbanceWater Erosion by HUC 1580 1501001206 0.02 Acres Operation DisturbanceWater Erosion by HUC 1590 1501001206 4.58 Acres Construction DisturbanceWater Erosion by HUC 1590 1501001206 0.46 Acres Operation DisturbanceWater Erosion by HUC 1590 1501001207 0.27 Acres Construction DisturbanceWater Erosion by HUC 1590 1501001207 0.10 Acres Operation DisturbanceWater Erosion by HUC 1600 1501000512 2.33 Acres Construction DisturbanceWater Erosion by HUC 1600 1501000512 1.02 Acres Operation DisturbanceWater Erosion by HUC 1600 1501001206 0.19 Acres Construction Disturbance

Page 384: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

Water Erosion by HUC 1600 1501001206 0.11 Acres Operation DisturbanceWater Erosion by HUC 1600 1501001207 10.04 Acres Construction DisturbanceWater Erosion by HUC 1600 1501001207 2.67 Acres Operation DisturbanceWater Erosion by HUC 1610 1501000512 2.23 Acres Construction DisturbanceWater Erosion by HUC 1610 1501000512 0.47 Acres Operation DisturbanceWater Erosion by HUC 1610 1501001206 27.84 Acres Construction DisturbanceWater Erosion by HUC 1610 1501001206 5.25 Acres Operation DisturbanceWater Erosion by HUC 1610 1501001504 15.33 Acres Construction DisturbanceWater Erosion by HUC 1610 1501001504 2.75 Acres Operation DisturbanceWater Erosion by HUC 1620 1501000512 24.93 Acres Construction DisturbanceWater Erosion by HUC 1620 1501000512 5.31 Acres Operation DisturbanceWater Erosion by HUC 1630 1501000512 9.05 Acres Construction DisturbanceWater Erosion by HUC 1630 1501000512 1.79 Acres Operation DisturbanceWater Erosion by HUC 1650 1501000512 1.24 Acres Construction DisturbanceWater Erosion by HUC 1650 1501000512 0.22 Acres Operation DisturbanceWater Erosion by HUC 1660 1501000512 3.74 Acres Construction DisturbanceWater Erosion by HUC 1660 1501000512 0.79 Acres Operation DisturbanceWater Erosion by HUC 1660 1501001507 0.15 Acres Construction DisturbanceWater Erosion by HUC 1660 1501001507 0.02 Acres Operation DisturbanceWater Erosion by HUC 1670 1501000512 0.05 Acres Construction DisturbanceWater Erosion by HUC 1670 1501000512 0.02 Acres Operation DisturbanceWater Erosion by HUC 1670 1501001507 0.29 Acres Construction DisturbanceWater Erosion by HUC 1670 1501001507 0.12 Acres Operation DisturbanceWater Erosion by HUC 1680 1501000512 1.67 Acres Construction DisturbanceWater Erosion by HUC 1680 1501000512 0.43 Acres Operation DisturbanceWater Erosion by HUC 1680 1501001507 3.13 Acres Construction DisturbanceWater Erosion by HUC 1680 1501001507 0.86 Acres Operation DisturbanceWater Erosion by HUC 1690 1501000512 0.85 Acres Construction DisturbanceWater Erosion by HUC 1690 1501000512 0.28 Acres Operation DisturbanceWater Erosion by HUC 1690 1501001507 1.04 Acres Construction DisturbanceWater Erosion by HUC 1690 1501001507 0.33 Acres Operation DisturbanceWater Erosion by HUC 1771 1501000513 0.17 Acres Construction DisturbanceWater Erosion by HUC 1771 1501000513 0.07 Acres Operation DisturbanceWater Erosion by HUC 1771 1503010101 0.32 Acres Construction DisturbanceWater Erosion by HUC 1771 1503010101 0.07 Acres Operation DisturbanceWater Erosion by HUC 1771 1606001518 0.12 Acres Construction DisturbanceWater Erosion by HUC 1771 1606001518 0.05 Acres Operation DisturbanceWETLANDS 1210 Greasewood Flat 7.02 Acres Construction DisturbanceWETLANDS 1210 Greasewood Flat 1.73 Acres Operation DisturbanceWETLANDS 1210 Montane Riverine 0.12 Acres Construction DisturbanceWETLANDS 1210 Montane Riverine 0.04 Acres Operation DisturbanceWETLANDS 1210 Open Water 0.01 Acres Construction DisturbanceWETLANDS 1210 Open Water 0.00 Acres Operation DisturbanceWETLANDS 1211 Greasewood Flat 0.06 Acres Construction DisturbanceWETLANDS 1211 Greasewood Flat 0.02 Acres Operation Disturbance

Page 385: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

WETLANDS 1212 Greasewood Flat 1.86 Acres Construction DisturbanceWETLANDS 1212 Greasewood Flat 0.74 Acres Operation DisturbanceWETLANDS 1214 Greasewood Flat 0.93 Acres Construction DisturbanceWETLANDS 1214 Greasewood Flat 0.21 Acres Operation DisturbanceWETLANDS 1215 Greasewood Flat 0.15 Acres Construction DisturbanceWETLANDS 1215 Greasewood Flat 0.03 Acres Operation DisturbanceWETLANDS 1215.05 Greasewood Flat 0.67 Acres Construction DisturbanceWETLANDS 1215.05 Greasewood Flat 0.22 Acres Operation DisturbanceWETLANDS 1320.05 Greasewood Flat 23.63 Acres Construction DisturbanceWETLANDS 1320.05 Greasewood Flat 3.98 Acres Operation DisturbanceWETLANDS 1320.05 Marsh 0.64 Acres Construction DisturbanceWETLANDS 1320.05 Marsh 0.12 Acres Operation DisturbanceWETLANDS 1320.05 Montane Riverine 7.48 Acres Construction DisturbanceWETLANDS 1320.05 Montane Riverine 1.37 Acres Operation DisturbanceWETLANDS 1320.05 Open Water 2.36 Acres Construction DisturbanceWETLANDS 1320.05 Open Water 0.59 Acres Operation DisturbanceWETLANDS 1320.05 Riverine 1.56 Acres Construction DisturbanceWETLANDS 1320.05 Riverine 0.25 Acres Operation DisturbanceWETLANDS 1320.15 Greasewood Flat 0.26 Acres Construction DisturbanceWETLANDS 1320.15 Greasewood Flat 0.19 Acres Operation DisturbanceWETLANDS 1320.15 Marsh 0.05 Acres Construction DisturbanceWETLANDS 1320.15 Marsh 0.04 Acres Operation DisturbanceWETLANDS 1320.15 Montane Riverine 6.14 Acres Construction DisturbanceWETLANDS 1320.15 Montane Riverine 2.99 Acres Operation DisturbanceWETLANDS 1320.15 Open Water 0.01 Acres Construction DisturbanceWETLANDS 1320.15 Open Water 0.01 Acres Operation DisturbanceWETLANDS 1320.2 Marsh 0.04 Acres Construction DisturbanceWETLANDS 1320.2 Marsh 0.01 Acres Operation DisturbanceWETLANDS 1320.2 Montane Riverine 1.29 Acres Construction DisturbanceWETLANDS 1320.2 Montane Riverine 0.45 Acres Operation DisturbanceWETLANDS 1320.2 Open Water 0.01 Acres Construction DisturbanceWETLANDS 1320.2 Open Water 0.01 Acres Operation DisturbanceWETLANDS 1320.21 Montane Riverine 0.42 Acres Construction DisturbanceWETLANDS 1320.21 Montane Riverine 0.15 Acres Operation DisturbanceWETLANDS 1321.01 Greasewood Flat 6.60 Acres Construction DisturbanceWETLANDS 1321.01 Greasewood Flat 1.23 Acres Operation DisturbanceWETLANDS 1321.01 Montane Riverine 3.50 Acres Construction DisturbanceWETLANDS 1321.01 Montane Riverine 0.86 Acres Operation DisturbanceWETLANDS 1321.01 Open Water 1.56 Acres Construction DisturbanceWETLANDS 1321.01 Open Water 0.40 Acres Operation DisturbanceWETLANDS 1321.01 Riverine 0.15 Acres Construction DisturbanceWETLANDS 1321.01 Riverine 0.05 Acres Operation DisturbanceWETLANDS 1322.02 Greasewood Flat 0.04 Acres Construction DisturbanceWETLANDS 1322.02 Greasewood Flat 0.01 Acres Operation DisturbanceWETLANDS 1322.12 Marsh 0.52 Acres Construction Disturbance

Page 386: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

WETLANDS 1322.12 Marsh 0.07 Acres Operation DisturbanceWETLANDS 1322.12 Montane Riverine 0.19 Acres Construction DisturbanceWETLANDS 1322.12 Montane Riverine 0.03 Acres Operation DisturbanceWETLANDS 1322.21 Greasewood Flat 0.04 Acres Construction DisturbanceWETLANDS 1322.21 Greasewood Flat 0.01 Acres Operation DisturbanceWETLANDS 1322.21 Marsh 0.11 Acres Construction DisturbanceWETLANDS 1322.21 Marsh 0.03 Acres Operation DisturbanceWETLANDS 1322.21 Open Water 0.19 Acres Construction DisturbanceWETLANDS 1322.21 Open Water 0.05 Acres Operation DisturbanceWETLANDS 1322.22 Greasewood Flat 0.00 Acres Construction DisturbanceWETLANDS 1322.22 Greasewood Flat 0.00 Acres Operation DisturbanceWETLANDS 1322.22 Marsh 1.56 Acres Construction DisturbanceWETLANDS 1322.22 Marsh 0.21 Acres Operation DisturbanceWETLANDS 1322.22 Open Water 0.20 Acres Construction DisturbanceWETLANDS 1322.22 Open Water 0.03 Acres Operation DisturbanceWETLANDS 1322.23 Marsh 1.56 Acres Construction DisturbanceWETLANDS 1322.23 Marsh 0.22 Acres Operation DisturbanceWETLANDS 1322.23 Montane Riverine 0.07 Acres Construction DisturbanceWETLANDS 1322.23 Montane Riverine 0.04 Acres Operation DisturbanceWETLANDS 1322.51 Greasewood Flat 0.07 Acres Construction DisturbanceWETLANDS 1322.51 Greasewood Flat 0.01 Acres Operation DisturbanceWETLANDS 1322.53 Marsh 0.15 Acres Construction DisturbanceWETLANDS 1322.53 Marsh 0.04 Acres Operation DisturbanceWETLANDS 1322.53 Montane Riverine 0.02 Acres Construction DisturbanceWETLANDS 1322.53 Montane Riverine 0.01 Acres Operation DisturbanceWETLANDS 1322.71 Greasewood Flat 0.10 Acres Construction DisturbanceWETLANDS 1322.71 Greasewood Flat 0.03 Acres Operation DisturbanceWETLANDS 1322.71 Marsh 3.30 Acres Construction DisturbanceWETLANDS 1322.71 Marsh 0.94 Acres Operation DisturbanceWETLANDS 1322.71 Montane Riverine 0.98 Acres Construction DisturbanceWETLANDS 1322.71 Montane Riverine 0.27 Acres Operation DisturbanceWETLANDS 1322.71 Open Water 0.24 Acres Construction DisturbanceWETLANDS 1322.71 Open Water 0.07 Acres Operation DisturbanceWETLANDS 1323.01 Marsh 3.12 Acres Construction DisturbanceWETLANDS 1323.01 Marsh 0.80 Acres Operation DisturbanceWETLANDS 1323.01 Montane Riverine 0.33 Acres Construction DisturbanceWETLANDS 1323.01 Montane Riverine 0.08 Acres Operation DisturbanceWETLANDS 1323.01 Open Water 0.04 Acres Construction DisturbanceWETLANDS 1323.01 Open Water 0.01 Acres Operation DisturbanceWETLANDS 1323.02 Marsh 0.84 Acres Construction DisturbanceWETLANDS 1323.02 Marsh 0.24 Acres Operation DisturbanceWETLANDS 1323.02 Montane Riverine 14.92 Acres Construction DisturbanceWETLANDS 1323.02 Montane Riverine 4.86 Acres Operation DisturbanceWETLANDS 1324 Marsh 0.77 Acres Construction DisturbanceWETLANDS 1324 Marsh 0.28 Acres Operation DisturbanceWETLANDS 1324 Montane Riverine 0.13 Acres Construction DisturbanceWETLANDS 1324 Montane Riverine 0.06 Acres Operation Disturbance

Page 387: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

WETLANDS 1325 Montane Riverine 1.37 Acres Construction DisturbanceWETLANDS 1325 Montane Riverine 0.52 Acres Operation DisturbanceWETLANDS 1350 Greasewood Flat 3.11 Acres Construction DisturbanceWETLANDS 1350 Greasewood Flat 1.20 Acres Operation DisturbanceWETLANDS 1350 Montane Riverine 3.03 Acres Construction DisturbanceWETLANDS 1350 Montane Riverine 0.96 Acres Operation DisturbanceWETLANDS 1360 Greasewood Flat 9.79 Acres Construction DisturbanceWETLANDS 1360 Greasewood Flat 3.05 Acres Operation DisturbanceWETLANDS 1360 Open Water 0.01 Acres Construction DisturbanceWETLANDS 1360 Open Water 0.00 Acres Operation DisturbanceWETLANDS 1360 Playa 0.01 Acres Construction DisturbanceWETLANDS 1360 Playa 0.00 Acres Operation DisturbanceWETLANDS 1430 Greasewood Flat 94.22 Acres Construction DisturbanceWETLANDS 1430 Greasewood Flat 18.89 Acres Operation DisturbanceWETLANDS 1430 Montane Riverine 1.09 Acres Construction DisturbanceWETLANDS 1430 Montane Riverine 0.22 Acres Operation DisturbanceWETLANDS 1430 Open Water 0.61 Acres Construction DisturbanceWETLANDS 1430 Open Water 0.13 Acres Operation DisturbanceWETLANDS 1430 Playa 8.11 Acres Construction DisturbanceWETLANDS 1430 Playa 1.64 Acres Operation DisturbanceWTPD 1030 WTPD 17.04 Acres Construction DisturbanceWTPD 1030 WTPD 3.24 Acres Operation DisturbanceWTPD 1040 WTPD 0.82 Acres Construction DisturbanceWTPD 1040 WTPD 0.16 Acres Operation DisturbanceWTPD 1100 WTPD 77.50 Acres Construction DisturbanceWTPD 1100 WTPD 14.05 Acres Operation DisturbanceWTPD 1101 WTPD 0.13 Acres Construction DisturbanceWTPD 1101 WTPD 0.02 Acres Operation DisturbanceWTPD 1106 WTPD 4.96 Acres Construction DisturbanceWTPD 1106 WTPD 2.06 Acres Operation DisturbanceWTPD 1110 WTPD 0.69 Acres Construction DisturbanceWTPD 1110 WTPD 0.13 Acres Operation DisturbanceWTPD 1115 WTPD 56.81 Acres Construction DisturbanceWTPD 1115 WTPD 10.86 Acres Operation DisturbanceWTPD 1116 WTPD 6.56 Acres Construction DisturbanceWTPD 1116 WTPD 1.25 Acres Operation DisturbanceWTPD 1120 WTPD 41.72 Acres Construction DisturbanceWTPD 1120 WTPD 8.99 Acres Operation DisturbanceWTPD 1120.1 WTPD 0.31 Acres Construction DisturbanceWTPD 1120.1 WTPD 0.17 Acres Operation DisturbanceWTPD 1120.2 WTPD 0.30 Acres Construction DisturbanceWTPD 1120.2 WTPD 0.05 Acres Operation DisturbanceWTPD 1187 WTPD 32.52 Acres Construction DisturbanceWTPD 1187 WTPD 10.00 Acres Operation DisturbanceWTPD 1190 WTPD 14.34 Acres Construction DisturbanceWTPD 1190 WTPD 3.34 Acres Operation DisturbanceWTPD 1210 WTPD 206.62 Acres Construction Disturbance

Page 388: Appendix M Project Impact Analyses Results by Segmenta123.g.akamai.net/7/123/11558/abc123/forestservic... · Appendix M Project Impact Analyses Results by Segment . TransWest Express

WTPD 1210 WTPD 32.53 Acres Operation DisturbanceWTPD 1211 WTPD 2.33 Acres Construction DisturbanceWTPD 1211 WTPD 0.54 Acres Operation DisturbanceWTPD 1212 WTPD 4.47 Acres Construction DisturbanceWTPD 1212 WTPD 1.63 Acres Operation DisturbanceWTPD 1214 WTPD 27.71 Acres Construction DisturbanceWTPD 1214 WTPD 6.19 Acres Operation DisturbanceWTPD 1215.05 WTPD 2.65 Acres Construction DisturbanceWTPD 1215.05 WTPD 0.97 Acres Operation DisturbanceWTPD 1217.01 WTPD 15.65 Acres Construction DisturbanceWTPD 1217.01 WTPD 3.85 Acres Operation DisturbanceWTPD 1220 WTPD 82.27 Acres Construction DisturbanceWTPD 1220 WTPD 16.82 Acres Operation DisturbanceWTPD 1222.05 WTPD 28.00 Acres Construction DisturbanceWTPD 1222.05 WTPD 4.64 Acres Operation DisturbanceWTPD 1222.3 WTPD 1.06 Acres Construction DisturbanceWTPD 1222.3 WTPD 0.23 Acres Operation DisturbanceWTPD 1223 WTPD 2.24 Acres Construction DisturbanceWTPD 1223 WTPD 0.59 Acres Operation DisturbanceWTPD 1225.2 WTPD 49.00 Acres Construction DisturbanceWTPD 1225.2 WTPD 11.09 Acres Operation DisturbanceWTPD 1320.05 WTPD 34.14 Acres Construction DisturbanceWTPD 1320.05 WTPD 6.44 Acres Operation DisturbanceWTPD 1325.1 WTPD 22.76 Acres Construction DisturbanceWTPD 1325.1 WTPD 6.40 Acres Operation DisturbanceWTPD 1330.1 WTPD 3.47 Acres Construction DisturbanceWTPD 1330.1 WTPD 0.63 Acres Operation Disturbance