Appendix F-2: Process Notification Letters

Page 2: Appendix F-2: Process Notification Letters · 2018-06-21 · PO Box 6002 Halfway House 1685, South Africa Building 1, Maxwell Office Park, Magwa Crescent West ... The WML Variation

Zitholele Consulting Reg. No. 2000/000392/07

PO Box 6002 Halfway House 1685, South Africa Building 1, Maxwell Office Park, Magwa Crescent West c/o Allandale Road & Maxwell Drive, Waterfall City, Midrand T : 011 207 2060 F : 086 674 6121 E : [email protected]

Directors : Dr. R.G.M. Heath, S. Pillay, N. Rajasakran

Our Ref : 12949-83-Let-003-DEIR Notification 28 February 2018

Dear Key Stakeholder

ENVIRONMENTAL IMPACT ASSESSMENT, WASTE MANAGEMENT LICENSE VARIATION APPLICATION

AND WATER USE LICENSE APPLICATION FOR THE PROPOSED RETROFITTING OF A FLUE GAS

DESULPHURISATION (FGD) SYSTEM AT MEDUPI POWER STATION, LEPHALALE, LIMPOPO PROVINCE

(DEA REF.: 14/12/16/3/3/3/110)

INVITATION TO KEY STAKEHOLDER WORKSHOP: TUESDAY, 13 MARCH 2018 AT 14H00

This letter serves to cordially invite you to attend the Key Stakeholder Workshop to be held on:

DATE: Tuesday, 13 March 2018

TIME: 14:00 – 16:00 (Registration from 13:30 until 14:00)

VENUE: Mogol Golf Club, George Wells Street, Lephalale,

(Map Attached – Appendix A)

The Key Stakeholder Workshop is part of the Environmental Impact Assessment (EIA), Variation of existing Waste

Management License Application, and Water Use License process being undertaken by Zitholele Consulting for the

proposed Retrofitting of a Flue Gas Desulphurisation (FGD) System at Medupi Power Station, Lephalale, Limpopo

Province.

The purpose of the workshop is to provide you, as a key stakeholder, with:

background to the proposed project

an overview of the Impact Assessment Phase process followed;

feedback on the assessment of environmental impacts identified and documented in the Draft Environmental

Impact Report (DEIR);

Feedback on key issues raised during the Scoping Phase;

an opportunity to seek clarity and raise comments and/or concerns; and

an opportunity to liaise with the project team members.

Zitholele Consulting believes that this o kshop has alue i allo i g you to hea othe stakeholde s’ ie s a d issues in context with your own, thus allowing for a more integrated approach.

Page 3: Appendix F-2: Process Notification Letters · 2018-06-21 · PO Box 6002 Halfway House 1685, South Africa Building 1, Maxwell Office Park, Magwa Crescent West ... The WML Variation

ENVIRONMENTAL IMPACT ASSESSMENT, WASTE MANAGEMENT LICENSE VARIATION APPLICATION AND WATER USE LICENSE

APPLICATION FOR THE PROPOSED RETROFITTING OF A FLUE GAS DESULPHURISATION (FGD) SYSTEM AT MEDUPI POWER

STATION, LEPHALALE, LIMPOPO PROVINCE

ZITHOLELE CONSULTING

We would like to remind you that the Draft Environmental Impact Report (DEIR) is available for public review and

comment from Monday, 19 February 2018 to Thursday, 05 April 2018. The WML Variation Application is available

for review from Monday, 5 March to 9 April 2018. Hard copies of the DEIR and WML Variation Application are

available at the following public places:

VENUE CONTACT DETAILS

Printed Copies

Lephalale Public Library, Civic Center Onverwacht, Cnr Joe Slovo and

Douwater Road, Lephalale Tel.: 014 762 1484 / 1453 / 1518

Marapong Community Library, 916 Phukubye Street, Marapong Tel.: 073 210 8954

Lesedi Tshukudu Thusong Centre, Steenbokpan Tel.: 082 927 2399

Agri SA, NTK Building, 1 Jan Louis Botha Avenue, Lephalale Tel.: 014 763 1888

The DEIR is a ailable fo do load f o Zitholele’s ebsite www.zitholele.co.za/environmental/) under heading

EIA fo Medupi FGD a d sub-headi g DEIR – Feb ua y 8 , a d is also a ailable o CD o e uest ia e ail from Zitholele Consulting. The report will also be available on the Eskom website

(http://www.eskom.co.za/OurCompany/SustainableDevelopment/EnvironmentalImpactAssessments/Pages/Enviro

nment_Impact_Assessments.aspx u de the headi g Medupi FGD

To ensure that we provide sufficient space and seating, you are kindly requested to complete the attached

registration form (Appendix B) and return it to the Public Participation Office (contact details provided on the

registration form included with this letter) on or before Wednesday, 07 March 2018.

We look forward to meeting you and are positive for a fruitful Key Stakeholder Workshop

Yours faithfully

Dr. Mathys Vosloo

ZITHOLELE CONSULTING (PTY) LTD

Appendix A: Map to venue (Mogol Golf Club) Appendix B: Key Stakeholder Workshop Registration Form

Page 4: Appendix F-2: Process Notification Letters · 2018-06-21 · PO Box 6002 Halfway House 1685, South Africa Building 1, Maxwell Office Park, Magwa Crescent West ... The WML Variation

������������ ��������������������������������������������������� ����

� ! "#$ "%#&"'()#$* +!*#,*""-#./+**/)#0*123"3"*

Page 5: Appendix F-2: Process Notification Letters · 2018-06-21 · PO Box 6002 Halfway House 1685, South Africa Building 1, Maxwell Office Park, Magwa Crescent West ... The WML Variation

ENVIRONMENTAL IMPACT ASSESSMENT, WASTE

MANAGEMENT LICENCE VARIATION APPLICATION

AND WATER USE LICENCE APPLICATION FOR THE

PROPOSED RETROFITTING OF A FLUE GAS

DESULPHURISATION (FGD) SYSTEM AT MEDUPI

POWER STATION, LEPHALALE, LIMPOPO PROVINCE

(DEA Ref.: 14/12/16/3/3/3/110)

Registration Form for attendance at the Key Stakeholder Workshop

EIA Public Participation Office

Mathys Vosloo / Lebo Petlane Zitholele Consulting (Pty) Ltd

P O Box 6002, Halfway House, 1685 Tel: 011 207 2060 Fax: 086 674 6121

Email: [email protected]

Please complete by Wednesday, 07 March 2018 and return to the EIA Public Participation Office (as above)

TITLE

FIRST NAME

INITIALS

SURNAME

ORGANISATION

(Please do not use acronyms)

POSTAL ADDRESS

POSTAL CODE

TEL NO

FAX NO

CELL

EMAIL

SIGNATURE

DATE

KEY STAKEHOLDER WORKSHOP REGISTRATION

I would like to attend the Key Stakeholder Workshop (please circle the appropriate block)

Please register my attendance for the Key Stakeholder Workshop on Tuesday, 13 March 2018 at 14h00 at the Mogol Golf Club, Lephalale

YES NO

If you cannot attend the Key Stakeholder Workshop would you like to receive a copy of the Key Stakeholder Workshop Minutes

YES NO

THANK YOU FOR YOUR REGISTRATION

Page 6: Appendix F-2: Process Notification Letters · 2018-06-21 · PO Box 6002 Halfway House 1685, South Africa Building 1, Maxwell Office Park, Magwa Crescent West ... The WML Variation

Zitholele Consulting Reg. No. 2000/000392/07

PO Box 6002 Halfway House 1685, South Africa Building 1, Maxwell Office Park, Magwa Crescent West c/o Allandale Road & Maxwell Drive, Waterfall City, Midrand T : 011 207 2060 F : 086 674 6121 E : [email protected]

Directors : Dr. R.G.M. Heath, S. Pillay, N. Rajasakran

Our Ref : 12949-83-Let-006-WML Variation Notification 05 March 2018

Dear Stakeholder

APPLICATION FOR VARIATIONS TO THE EXISTING WASTE MANAGEMENT LICENSE (12/9/11/L50/5/R1)

FOR THE MEDUPI POWER STATION ASH DISPOSAL FACILITY, LIMPOPO PROVINCE

NOTIFICATION OF THE AVAILABILITY OF WASTE MANAGEMENT LICENSE (WML) VARIATION APPLICATION AND

INVITATION TO PUBLIC MEETINGS

This letter serves to inform you that the WML Variation Application and Motivation Report is available for public

review and comment from Monday, 05 March 2018 to Monday, 09 April 2018.

Hard copies of the WML Variation Application and Motivation Report are available at the following public places:

VENUE CONTACT DETAILS

Printed Copies

Lephalale Public Library, Civic Center Onverwacht, Cnr Joe Slovo and

Douwater Road, Lephalale Tel.: 014 762 1484 / 1453 / 1518

Marapong Community Library, 916 Phukubye Street, Marapong Tel.: 073 210 8954

Lesedi Tshukudu Thusong Centre, Steenbokpan Tel.: 082 927 2399

Agri SA, NTK Building, 1 Jan Louis Botha Avenue, Lephalale Tel.: 014 763 1888

The WML Variation Application is furthermore a ailable fo do load f o Zitholele’s ebsite (www.zitholele.co.za/environmental/) u de headi g EIA fo Medupi FGD a d sub-headi g WML Variation

Application – March 2018 , a d is also a ailable o CD o e uest ia e ail f o Zitholele Co sulti g. The report

will also be available on the Eskom website

(http://www.eskom.co.za/OurCompany/SustainableDevelopment/EnvironmentalImpactAssessments/Pages/Enviro

nment_Impact_Assessments.aspx) u de the headi g Medupi FGD .

You are requested to comment on the DSR in any of the following ways:

Completing the comment sheet enclosed (Appendix A);

Writing a letter, or producing additional written submissions;

Sending an e-mail or phoning the public participation office; or

Attending any one of the public meetings (see below for details).

Page 7: Appendix F-2: Process Notification Letters · 2018-06-21 · PO Box 6002 Halfway House 1685, South Africa Building 1, Maxwell Office Park, Magwa Crescent West ... The WML Variation

APPLICATION FOR VARIATIONS TO THE EXISTING WASTE MANAGEMENT LICENSE (12/9/11/L50/5/R1) FOR THE MEDUPI POWER

STATION ASH DISPOSAL FACILITY, LIMPOPO PROVINCE

ZITHOLELE CONSULTING

Invitation to Public Meetings

Public Meetings, where a summary of the WML Variation Application will be presented and discussed, will be held.

The Public Meetings are scheduled to be held as follows:

DATE TIME VENUE

Monday, 12 March 2018 11:00 – 13:00

(Registration from 10:30)

Community Hall, Lesedi Tshukudu Thusong Centre,

Steenbokpan. Enquiries Cllr Pienaar: 082 927 2399

Monday, 12 March 2018 15:00 – 17:00

(Registration from 14:30)

Ditheku Primary School, 1601 Ramahlody Street,

Marapong Ext 2.

Tuesday, 13 March 2018 18:00 – 20:00

(Registration from 17h30)

Mogol Golf Club, George Wells St., Onverwacht,

Lephalale. Tel: 014 763 2427

To ensure that we provide sufficient seating, you are kindly requested to complete the attached registration form

(Appendix B) and return it to the Public Participation Office (contact details provided on the registration form –

Appendix B) on or before Friday, 9 March 2018.

We would like to express our appreciation to the stakeholders who have participated in this process thus far.

Yours faithfully

Dr. Mathys Vosloo

ZITHOLELE CONSULTING (PTY) LTD

Appendix A: DSR Comment Form Appendix B: Registration Form for Public Meeting

Page 8: Appendix F-2: Process Notification Letters · 2018-06-21 · PO Box 6002 Halfway House 1685, South Africa Building 1, Maxwell Office Park, Magwa Crescent West ... The WML Variation

APPLICATION FOR VARIATIONS TO THE EXISTING

WASTE MANAGEMENT LICENSE (12/9/11/L50/5/R1)

FOR THE MEDUPI POWER STATION ASH DISPOSAL

FACILITY, LIMPOPO PROVINCE

COMMENT SHEET : WML Variation Application

Available for public review from 05 March 2018 to 09 April 2018.

EIA Public Participation Office Mathys Vosloo / Lebo Petlane Zitholele Consulting (Pty) Ltd

P O Box 6002, Halfway House, 1685 Tel: 011 207 2060 Fax: 086 674 6121

Email: [email protected]

Please complete by Friday 09 March 2018 and return to the EIA Public Participation Office (as above)

TITLE

FIRST NAME

INITIALS

SURNAME

ORGANISATION

(Please do not use any acronyms)

POSTAL ADDRESS

POSTAL CODE

TEL NO

FAX NO

CELL

EMAIL

SIGNATURE

DATE

COMMENTS (Please use separate sheets if necessary)

1. I have the following concern / questions / queries.

..................................................................................................................................................................................... ..................................................................................................................................................................................... ..................................................................................................................................................................................... ..................................................................................................................................................................................... ..................................................................................................................................................................................... ..................................................................................................................................................................................... …………………………………………………………………………………………………………………………………… …………………………………………………………………………………………………………………………………… ……………………………………………………………………………………………………………………………………

2. I would like to receive further communication through the following means of communication. Email Fax SMS Mail

Please note to ensure your contact details for the communication method chosen are correctly captured above.

3. Any other comments you may have: ..................................................................................................................................................................................... .....................................................................................................................................................................................

THANK YOU FOR YOUR CONTRIBUTION

Page 9: Appendix F-2: Process Notification Letters · 2018-06-21 · PO Box 6002 Halfway House 1685, South Africa Building 1, Maxwell Office Park, Magwa Crescent West ... The WML Variation

APPLICATION FOR VARIATIONS TO THE EXISTING

WASTE MANAGEMENT LICENSE (12/9/11/L50/5/R1)

FOR THE MEDUPI POWER STATION ASH DISPOSAL

FACILITY, LIMPOPO PROVINCE

Reply sheet to receive the WML Variation Application and to attend the Public Meetings on 12 and/or 13

March 2018

EIA Public Participation Office Mathys Vosloo / Lebo Petlane Zitholele Consulting (Pty) Ltd

P O Box 6002, Halfway House, 1685 Tel: 011 207 2060 Fax: 086 674 6121

Email: [email protected]

Please complete by Friday 09 March 2018 and return to the EIA Public Participation Office (as above)

TITLE

FIRST NAME

INITIALS

SURNAME

ORGANISATION

(Please do not use any acronyms)

POSTAL ADDRESS

POSTAL CODE

TEL NO

FAX NO

CELL

EMAIL

SIGNATURE

DATE

REGISTRATION TO RECEIVE THE WML VARIATION APPLICATION AND/OR TO ATTEND THE PUBLIC MEETINGS

WML VARIATION APPLICATION REPORT I would like to receive a copy of the report (please circle the appropriate block)

CD by mail YES NO

PUBLIC MEETING I would like to attend the public meeting (please circle the appropriate block)

I will attend the Public Meeting on Monday, 12 March 2018 at Lesedi Tshukudu Thusong Centre, Steenbokpan from 11:00 to 13:00 (Registration from 10:30)

YES NO

I will attend the Public Meeting on Monday, 12 March 2018 at Ditheku Primary School, 1601 Ramahlody Street, Marapong Ext 2 from 15:00 to 17:00 (Registration from 14:30)

YES NO

I will attend the Public Meeting on Tuesday, 13 March 2018 at Mogol Golf Club from 18:00 to 20:00 (Registration from 17:30) YES NO

If you cannot attend any of the Public Meetings, would you like to receive a copy of the Minutes? YES NO

Please invite my colleagues/friends/neighbours to the Public Meetings (Please provide contact details):

………………………………………………………………………………………………………………………………………… ………………………………………………………………………………………………………………………………………… …………………………………………………………………………………………………………………………………………

THANK YOU FOR YOUR CONTRIBUTION

Page 10: Appendix F-2: Process Notification Letters · 2018-06-21 · PO Box 6002 Halfway House 1685, South Africa Building 1, Maxwell Office Park, Magwa Crescent West ... The WML Variation

Zitholele Consulting Reg. No. 2000/000392/07

PO Box 6002 Halfway House 1685, South Africa Building 1, Maxwell Office Park, Magwa Crescent West c/o Allandale Road & Maxwell Drive, Waterfall City, Midrand T : 011 207 2060 F : 086 674 6121 E : [email protected]

Directors : Dr. R.G.M. Heath, S. Pillay, N. Rajasakran

Our Ref : 12949-83-Let-005-Notification EMC 09 March 2018

Dear Medupi EMC Stakeholder

ENVIRONMENTAL IMPACT ASSESSMENT, WASTE MANAGEMENT LICENSE VARIATION AND WATER USE

LICENCE FOR THE PROPOSED RETROFITTING OF A FLUE GAS DESULPHURISATION (FGD) SYSTEM AT

MEDUPI POWER STATION, LEPHALALE, LIMPOPO PROVINCE

NOTIFICATION OF THE AVAILABILITY OF THE DEIR, WML VARIATION APPLICATION AND PUBLIC MEETINGS

This letter serves as a notification that the Draft Environmental Impact Report (DEIR) and Waste Management

Licence (WML) Variation Application is available for public review and comment as follow:

DEIR: Monday, 19 February 2018 to Thursday, 05 April 2018

WML Variation Application: Monday, 05 March 2018 to Monday, 09 April 2018.

Hard copies of the DEIR and WML Variation Application are available at the following public places:

VENUE CONTACT DETAILS

Printed Copies

Lephalale Public Library, Civic Center Onverwacht, Cnr Joe Slovo and

Douwater Road, Lephalale Tel.: 014 762 1484 / 1453 / 1518

Marapong Community Library, 916 Phukubye Street, Marapong Tel.: 073 210 8954

Lesedi Tshukudu Thusong Centre, Steenbokpan Tel.: 082 927 2399

Agri SA, NTK Building, 1 Jan Louis Botha Avenue, Lephalale Tel.: 014 763 1888

The DEIR and WML Variation Application are a ailable for do load fro Zitholele’s ebsite (www.zitholele.co.za/environmental/) under headi g EIA for Medupi FGD , and is also available on CD on request

via email from Zitholele Consulting. The reports are also available on the Eskom website

(http://www.eskom.co.za/OurCompany/SustainableDevelopment/EnvironmentalImpactAssessments/Pages/Enviro

nment_Impact_Assessments.aspx) u der the headi g Medupi FGD .

You are requested to comment on the DEIR and WML Variation Application in any of the following ways:

Completing the comment sheet enclosed (Appendix A);

Writing a letter, or producing additional written submissions;

Sending an e-mail or phoning the public participation office; or

Attending any one of the public meetings (see below for details).

Page 11: Appendix F-2: Process Notification Letters · 2018-06-21 · PO Box 6002 Halfway House 1685, South Africa Building 1, Maxwell Office Park, Magwa Crescent West ... The WML Variation

ENVIRONMENTAL IMPACT ASSESSMENT, WASTE MANAGEMENT LICENSE VARIATION AND WATER USE LICENCE FOR THE

PROPOSED RETROFITTING OF A FLUE GAS DESULPHURISATION (FGD) SYSTEM AT MEDUPI POWER STATION, LEPHALALE,

LIMPOPO PROVINCE

ZITHOLELE CONSULTING

Invitation to Public Meetings

Public Meetings, where a summary of the Environmental Impact Assessment process and potential environmental

impacts identified will be presented and discussed, will be held.

The Public Meetings are scheduled to be held as follows:

DATE TIME VENUE

Monday, 12 March 2018 11:00 – 13:00 (Registration

from 10:30)

Community Hall, Lesedi Tshukudu Thusong Centre,

Steenbokpan. Enquiries Cllr Pienaar: 082 927 2399

Monday, 12 March 2018 15:00 – 17:00 (Registration

from 14:30)

Ditheku Primary School, 1601 Ramahlody Street,

Marapong Ext 2.

Tuesday, 13 March 2018 18:00 – 20:00 (Registration

from 17h30)

Mogol Golf Club, George Wells St., Onverwacht,

Lephalale. Tel: 014 763 2427

We would like to express our appreciation to the stakeholders who have participated in this EIA process thus far.

Yours faithfully

Dr. Mathys Vosloo

ZITHOLELE CONSULTING (PTY) LTD

Appendix A: Comment Form

Page 12: Appendix F-2: Process Notification Letters · 2018-06-21 · PO Box 6002 Halfway House 1685, South Africa Building 1, Maxwell Office Park, Magwa Crescent West ... The WML Variation

ENVIRONMENTAL IMPACT ASSESSMENT, WASTE

MANAGEMENT LICENSE VARIATION AND WATER

USE LICENCE FOR THE PROPOSED RETROFITTING

OF A FLUE GAS DESULPHURISATION (FGD) SYSTEM

AT MEDUPI POWER STATION, LEPHALALE, LIMPOPO

PROVINCE

COMMENT SHEET : DEIR & WML Variation Application

EIA Public Participation Office Mathys Vosloo / Lebo Petlane Zitholele Consulting (Pty) Ltd

P O Box 6002, Halfway House, 1685 Tel: 011 207 2060 Fax: 086 674 6121

Email: [email protected]

Please complete and return to the EIA Public Participation Office (as above)

TITLE

FIRST NAME

INITIALS

SURNAME

ORGANISATION

(Please do not use any acronyms)

POSTAL ADDRESS

POSTAL CODE

TEL NO

FAX NO

CELL

EMAIL

SIGNATURE

DATE

COMMENTS (Please use separate sheets if necessary)

1. I have the following concern / questions / queries.

..................................................................................................................................................................................... ..................................................................................................................................................................................... ..................................................................................................................................................................................... ..................................................................................................................................................................................... ..................................................................................................................................................................................... ..................................................................................................................................................................................... …………………………………………………………………………………………………………………………………… …………………………………………………………………………………………………………………………………… ……………………………………………………………………………………………………………………………………

2. I would like to receive further communication through the following means of communication. Email Fax SMS Mail

Please note to ensure your contact details for the communication method chosen are correctly captured above.

3. Any other comments you may have: ..................................................................................................................................................................................... .....................................................................................................................................................................................

THANK YOU FOR YOUR CONTRIBUTION

Page 13: Appendix F-2: Process Notification Letters · 2018-06-21 · PO Box 6002 Halfway House 1685, South Africa Building 1, Maxwell Office Park, Magwa Crescent West ... The WML Variation

Zitholele Consulting Reg. No. 2000/000392/07

PO Box 6002 Halfway House 1685, South Africa Building 1, Maxwell Office Park, Magwa Crescent West c/o Allandale Road & Maxwell Drive, Waterfall City, Midrand T : 011 207 2060 F : 086 674 6121 E : [email protected]

Directors : Dr. R.G.M. Heath, S. Pillay, N. Rajasakran

Our Ref : 12949-83-Let-004-Rem2 PM 09 March 2018

Dear Stakeholder

ENVIRONMENTAL IMPACT ASSESSMENT, WASTE MANAGEMENT LICENSE VARIATION AND WATER USE

LICENCE FOR THE PROPOSED RETROFITTING OF A FLUE GAS DESULPHURISATION (FGD) SYSTEM AT

MEDUPI POWER STATION, LEPHALALE, LIMPOPO PROVINCE

2ND

REMINDER OF THE AVAILABILITY OF THE DEIR, WML VARIATION APPLICATION AND PUBLIC MEETINGS

This letter serves as a 2nd

reminder that the Draft Environmental Impact Report (DEIR) and Waste Management

Licence (WML) Variation Application is available for public review and comment as follow:

DEIR: Monday, 19 February 2018 to Thursday, 05 April 2018

WML Variation Application: Monday, 05 March 2018 to Monday, 09 April 2018.

Hard copies of the DEIR and WML Variation Application are available at the following public places:

VENUE CONTACT DETAILS

Printed Copies

Lephalale Public Library, Civic Center Onverwacht, Cnr Joe Slovo and

Douwater Road, Lephalale Tel.: 014 762 1484 / 1453 / 1518

Marapong Community Library, 916 Phukubye Street, Marapong Tel.: 073 210 8954

Lesedi Tshukudu Thusong Centre, Steenbokpan Tel.: 082 927 2399

Agri SA, NTK Building, 1 Jan Louis Botha Avenue, Lephalale Tel.: 014 763 1888

The DEIR and WML Variation Application are a ailable for do load fro Zitholele’s ebsite (www.zitholele.co.za/environmental/) under headi g EIA for Medupi FGD , and is also available on CD on request

via email from Zitholele Consulting. The reports are also available on the Eskom website

(http://www.eskom.co.za/OurCompany/SustainableDevelopment/EnvironmentalImpactAssessments/Pages/Enviro

nment_Impact_Assessments.aspx) u der the headi g Medupi FGD .

You are requested to comment on the DEIR and WML Variation Application in any of the following ways:

Completing the comment sheet enclosed (Appendix A);

Writing a letter, or producing additional written submissions;

Sending an e-mail or phoning the public participation office; or

Page 14: Appendix F-2: Process Notification Letters · 2018-06-21 · PO Box 6002 Halfway House 1685, South Africa Building 1, Maxwell Office Park, Magwa Crescent West ... The WML Variation

ENVIRONMENTAL IMPACT ASSESSMENT, WASTE MANAGEMENT LICENSE VARIATION AND WATER USE LICENCE FOR THE

PROPOSED RETROFITTING OF A FLUE GAS DESULPHURISATION (FGD) SYSTEM AT MEDUPI POWER STATION, LEPHALALE,

LIMPOPO PROVINCE

ZITHOLELE CONSULTING

Attending any one of the public meetings (see below for details).

Invitation to Public Meetings

Public Meetings, where a summary of the Environmental Impact Assessment process and potential environmental

impacts identified will be presented and discussed, will be held.

PLEASE NOTE THAT THE VENUE FOR THE PUBLIC MEETING IN MARAPONG HAS CHANGED AS PER TABLE BELOW.

The Public Meetings are scheduled to be held as follows:

DATE TIME VENUE

Monday, 12 March 2018 11:00 – 13:00 (Registration

from 10:30)

Community Hall, Lesedi Tshukudu Thusong Centre,

Steenbokpan. Enquiries Cllr Pienaar: 082 927 2399

Monday, 12 March 2018 15:00 – 17:00 (Registration

from 14:30)

Ditheku Primary School, 1601 Ramahlody Street,

Marapong Ext 2.

Tuesday, 13 March 2018 18:00 – 20:00 (Registration

from 17h30)

Mogol Golf Club, George Wells St., Onverwacht,

Lephalale. Tel: 014 763 2427

We would like to express our appreciation to the stakeholders who have participated in this EIA process thus far.

Yours faithfully

Dr. Mathys Vosloo

ZITHOLELE CONSULTING (PTY) LTD

Appendix A: Comment Form

Page 15: Appendix F-2: Process Notification Letters · 2018-06-21 · PO Box 6002 Halfway House 1685, South Africa Building 1, Maxwell Office Park, Magwa Crescent West ... The WML Variation

Zitholele Consulting Reg. No. 2000/000392/07

PO Box 6002 Halfway House 1685, South Africa Building 1, Maxwell Office Park, Magwa Crescent West c/o Allandale Road & Maxwell Drive, Waterfall City, Midrand T : 011 207 2060 F : 086 674 6121 E : [email protected]

Directors : Dr. R.G.M. Heath, S. Pillay, N. Rajasakran

Our Ref : 12949-83-Let-004-Rem1 PM 28 February 2018

Dear Stakeholder

ENVIRONMENTAL IMPACT ASSESSMENT, WASTE MANAGEMENT LICENSE VARIATION AND WATER USE

LICENCE FOR THE PROPOSED RETROFITTING OF A FLUE GAS DESULPHURISATION (FGD) SYSTEM AT

MEDUPI POWER STATION, LEPHALALE, LIMPOPO PROVINCE (DEA REF.: 14/12/16/3/3/3/110)

REMINDER NOTIFICATION OF THE AVAILABILITY OF THE DEIR AND PUBLIC MEETINGS

This letter serves to remind you that the Draft Environmental Impact Report (DEIR) is currently available for public

review and comment from Monday, 19 February 2018 to Thursday, 05 April 2018.

Hard copies of the DEIR are available at the following public places:

VENUE CONTACT DETAILS

Printed Copies

Lephalale Public Library, Civic Center Onverwacht, Cnr Joe Slovo and

Douwater Road, Lephalale Tel.: 014 762 1484 / 1453 / 1518

Marapong Community Library, 916 Phukubye Street, Marapong Tel.: 073 210 8954

Lesedi Tshukudu Thusong Centre, Steenbokpan Tel.: 082 927 2399

Agri SA, NTK Building, 1 Jan Louis Botha Avenue, Lephalale Tel.: 014 763 1888

The DEIR is a ailable fo do load f o Zitholele’s ebsite www.zitholele.co.za/environmental/) under heading

EIA fo Medupi FGD a d sub-headi g DEIR – Feb ua y 8 , a d is also a ailable o CD o e uest ia e ail from Zitholele Consulting. The report will also be available on the Eskom website

(http://www.eskom.co.za/OurCompany/SustainableDevelopment/EnvironmentalImpactAssessments/Pages/Enviro

nment_Impact_Assessments.aspx u de the headi g Medupi FGD .

You are requested to comment on the DEIR in any of the following ways:

Completing the comment sheet enclosed (Appendix A);

Writing a letter, or producing additional written submissions;

Sending an e-mail or phoning the public participation office; or

Attending any one of the public meetings (see below for details).

Page 16: Appendix F-2: Process Notification Letters · 2018-06-21 · PO Box 6002 Halfway House 1685, South Africa Building 1, Maxwell Office Park, Magwa Crescent West ... The WML Variation

ENVIRONMENTAL IMPACT ASSESSMENT, WASTE MANAGEMENT LICENSE VARIATION AND WATER USE LICENCE FOR THE

PROPOSED RETROFITTING OF A FLUE GAS DESULPHURISATION (FGD) SYSTEM AT MEDUPI POWER STATION, LEPHALALE,

LIMPOPO PROVINCE (DEA REF.: 14/12/16/3/3/3/110)

ZITHOLELE CONSULTING

Invitation to Public Meetings

Public Meetings, where a summary of the Environmental Impact Assessment process and potential environmental

impacts identified will be presented and discussed, will be held.

PLEASE NOTE THAT THE VENUE FOR THE PUBLIC MEETING IN MARAPONG HAS CHANGED AS PER TABLE BELOW.

The Public Meetings are scheduled to be held as follows:

DATE TIME VENUE

Monday, 12 March 2018 11:00 – 13:00 (Registration

from 10:30)

Community Hall, Lesedi Tshukudu Thusong Centre,

Steenbokpan. Enquiries Cllr Pienaar: 082 927 2399

Monday, 12 March 2018 15:00 – 17:00 (Registration

from 14:30)

Ditheku Primary School, 1601 Ramahlody Street,

Marapong Ext 2.

Tuesday, 13 March 2018 18:00 – 20:00 (Registration

from 17h30)

Mogol Golf Club, George Wells St., Onverwacht,

Lephalale. Tel: 014 763 2427

To ensure that we provide sufficient seating, you are kindly requested to complete the attached registration form

(Appendix B) and return it to the Public Participation Office (contact details provided on the registration form –

Appendix B) on or before Friday, 2 March 2018.

We would like to express our appreciation to the stakeholders who have participated in this EIA process thus far.

Yours faithfully

Dr. Mathys Vosloo

ZITHOLELE CONSULTING (PTY) LTD

Appendix A: DSR Comment Form Appendix B: Registration Form for Public Meeting

Page 17: Appendix F-2: Process Notification Letters · 2018-06-21 · PO Box 6002 Halfway House 1685, South Africa Building 1, Maxwell Office Park, Magwa Crescent West ... The WML Variation

ENVIRONMENTAL IMPACT ASSESSMENT FOR THE

PROPOSED RETROFITTING OF A FLUE GAS

DESULPHURISATION (FGD) SYSTEM AT MEDUPI

POWER STATION, LEPHALALE, LIMPOPO PROVINCE

(DEA Ref.: 14/12/16/3/3/3/110)

COMMENT SHEET : DEIR

Available for public review from 19 February 2018 to 05 April 2018.

EIA Public Participation Office Mathys Vosloo / Lebo Petlane Zitholele Consulting (Pty) Ltd

P O Box 6002, Halfway House, 1685 Tel: 011 207 2060 Fax: 086 674 6121

Email: [email protected]

Please complete by Friday 02 March 2018 and return to the EIA Public Participation Office (as above)

TITLE

FIRST NAME

INITIALS

SURNAME

ORGANISATION

(Please do not use any acronyms)

POSTAL ADDRESS

POSTAL CODE

TEL NO

FAX NO

CELL

EMAIL

SIGNATURE

DATE

COMMENTS (Please use separate sheets if necessary)

1. I have the following concern / questions / queries.

..................................................................................................................................................................................... ..................................................................................................................................................................................... ..................................................................................................................................................................................... ..................................................................................................................................................................................... ..................................................................................................................................................................................... ..................................................................................................................................................................................... …………………………………………………………………………………………………………………………………… …………………………………………………………………………………………………………………………………… ……………………………………………………………………………………………………………………………………

2. I would like to receive further communication through the following means of communication. Email Fax SMS Mail

Please note to ensure your contact details for the communication method chosen are correctly captured above.

3. Any other comments you may have: ..................................................................................................................................................................................... .....................................................................................................................................................................................

THANK YOU FOR YOUR CONTRIBUTION

Page 18: Appendix F-2: Process Notification Letters · 2018-06-21 · PO Box 6002 Halfway House 1685, South Africa Building 1, Maxwell Office Park, Magwa Crescent West ... The WML Variation

ENVIRONMENTAL IMPACT ASSESSMENT FOR THE

PROPOSED RETROFITTING OF A FLUE GAS

DESULPHURISATION (FGD) SYSTEM AT MEDUPI

POWER STATION, LEPHALALE, LIMPOPO PROVINCE

(DEA Ref.: 14/12/16/3/3/3/110)

Reply sheet to receive the Draft Environmental Impact Report (DEIR) and to attend the Public Meetings on 12

and/or 13 March 2018

EIA Public Participation Office Mathys Vosloo / Lebo Petlane Zitholele Consulting (Pty) Ltd

P O Box 6002, Halfway House, 1685 Tel: 011 207 2060 Fax: 086 674 6121

Email: [email protected]

Please complete by Friday 02 March 2018 and return to the EIA Public Participation Office (as above)

TITLE

FIRST NAME

INITIALS

SURNAME

ORGANISATION

(Please do not use any acronyms)

POSTAL ADDRESS

POSTAL CODE

TEL NO

FAX NO

CELL

EMAIL

SIGNATURE

DATE

REGISTRATION TO RECEIVE THE DEIR AND/OR TO ATTEND THE PUBLIC MEETINGS

DRAFT ENVIRONMENTAL IMPACT REPORT I would like to receive a copy of the DEIR (please circle the appropriate block)

CD by mail YES NO

PUBLIC MEETING I would like to attend the public meeting (please circle the appropriate block)

I will attend the Public Meeting on Monday, 12 March 2018 at Lesedi Tshukudu Thusong Centre, Steenbokpan from 11:00 to 13:00 (Registration from 10:30)

YES NO

I will attend the Public Meeting on Monday, 12 March 2018 at Marapong Community Library from 17:00 to 19:00 (Registration from 16:30)

YES NO

I will attend the Public Meeting on Tuesday, 13 March 2018 at Mogol Golf Club from 18:00 to 20:00 (Registration from 17:30) YES NO

If you cannot attend any of the Public Meetings, would you like to receive a copy of the Minutes? YES NO

Please invite my colleagues/friends/neighbours to the Public Meetings (Please provide contact details):

………………………………………………………………………………………………………………………………………… ………………………………………………………………………………………………………………………………………… …………………………………………………………………………………………………………………………………………

THANK YOU FOR YOUR CONTRIBUTION

Page 19: Appendix F-2: Process Notification Letters · 2018-06-21 · PO Box 6002 Halfway House 1685, South Africa Building 1, Maxwell Office Park, Magwa Crescent West ... The WML Variation

Zitholele Consulting Reg. No. 2000/000392/07

PO Box 6002 Halfway House 1685, South Africa Building 1, Maxwell Office Park, Magwa Crescent West c/o Allandale Road & Maxwell Drive, Waterfall City, Midrand T : 011 207 2060 F : 086 674 6121 E : [email protected]

Directors : Dr. R.G.M. Heath, S. Pillay, N. Rajasakran

Our Ref : 12949-83-Let-004-Rem2 29 March 2018

Dear Stakeholder

ENVIRONMENTAL IMPACT ASSESSMENT, WASTE MANAGEMENT LICENSE VARIATION AND WATER USE

LICENCE FOR THE PROPOSED RETROFITTING OF A FLUE GAS DESULPHURISATION (FGD) SYSTEM AT

MEDUPI POWER STATION, LEPHALALE, LIMPOPO PROVINCE

NOTIFICATION OF SUBMISSION OF AMENDED EIA APPLICATION FORM TO DEA

AVAILABILITY OF MEETING PRESENTATIONS

REMINDER NOTIFICATION OF THE AVAILABILITY OF THE DEIR AND WML VARIATION APPLICATION

Notification of submission of amended EIA Application Form to DEA

This letter serves to notify all stakeholders that an amended EIA application form (non-integrated application) was

submitted to the Department of Environmental Affairs (DEA) on 26 March 2018. Due to the changes to the

packaging of the various components of the Medupi FGD Retrofit Project, as explained in the two Bridging

Documents and DEIR, the submission of an amended EIA application form to the DEA was necessary due to the fact

that the EIA application was no longer an application for integrated environmental authorisation and waste

management licence in terms of the National Environmental Management Act, 1998 (Act No. 107 of 1998), as

amended and the Environmental Impact Assessment Regulations, 2010; and the National Environmental

Management: Waste Act, 2008 (Act No. 59 of 2008).

As a result, an application for authorisation in terms of the National Environmental Management Act, 1998 (Act No.

107 of 1998), and the Environmental Impact Assessment Regulations, 2014 only has been applied for through the

submission of the amended EIA Application Form to the DEA. A new DEA reference number will be assigned to

Medupi FGD Retrofit Project EIA process which will be communicated to all stakeholders once received.

The amended EIA Application Form, including the bridging documents and DEIR referred to above, is available for

do load fro Zitholele’s ebsite www.zitholele.co.za/environmental/) under headi g EIA for Medupi FGD .

Page 20: Appendix F-2: Process Notification Letters · 2018-06-21 · PO Box 6002 Halfway House 1685, South Africa Building 1, Maxwell Office Park, Magwa Crescent West ... The WML Variation

ENVIRONMENTAL IMPACT ASSESSMENT, WASTE MANAGEMENT LICENSE VARIATION AND WATER USE LICENCE FOR THE

PROPOSED RETROFITTING OF A FLUE GAS DESULPHURISATION (FGD) SYSTEM AT MEDUPI POWER STATION, LEPHALALE,

LIMPOPO PROVINCE

ZITHOLELE CONSULTING

Availability of PPP Meeting Presentations

The agendas, presentations given and attendance registers for all meetings held on 12 and 13 March 2018 are

available for download and review fro Zitholele’s ebsite www.zitholele.co.za/environmental/) under heading

EIA for Medupi FGD . Please note the meeting at Ditheku Primary School, Marapong, was not held due to a lack of

attendance of any stakeholders. As a result an ad hoc Key Stakeholder Meeting was undertaken with

representatives of the Waterberg Environmental Justice Forum (WEJF) on 14 March 2018, who is an active

Community Based Organisation in the local communities.

Reminder: DEIR and WML available for Public Review

This letter serves to remind you that the Draft Environmental Impact Report (DEIR) is currently available for public

review and comment until Thursday, 05 April 2018. The Waste Management Licence (WML) Variation Application is

also available for review until Monday, 9 April 2018.

Hard copies of the DEIR and WML Variation Application are available at the following public places:

VENUE CONTACT DETAILS

Printed Copies

Lephalale Public Library, Civic Center Onverwacht, Cnr Joe Slovo and

Douwater Road, Lephalale Tel.: 014 762 1484 / 1453 / 1518

Marapong Community Library, 916 Phukubye Street, Marapong Tel.: 073 210 8954

Lesedi Tshukudu Thusong Centre, Steenbokpan Tel.: 082 927 2399

Agri SA, NTK Building, 1 Jan Louis Botha Avenue, Lephalale Tel.: 014 763 1888

The DEIR and WML Variation Application are a ailable for do load fro Zitholele’s ebsite (www.zitholele.co.za/environmental/) under headi g EIA for Medupi FGD , and is also available per CD on request

via email from Zitholele Consulting. These reports are also be available on the Eskom website

(http://www.eskom.co.za/OurCompany/SustainableDevelopment/EnvironmentalImpactAssessments/Pages/Enviro

nment_Impact_Assessments.aspx u der the headi g Medupi FGD .

You are requested to comment on the DEIR in any of the following ways:

Completing the comment sheet enclosed (Appendix A);

Writing a letter, or producing additional written submissions; or

Sending an e-mail or phoning the public participation office.

Contact details of the Public Participation Office:

EIA Public Participation Office: Mathys Vosloo / Lebo Petlane

Zitholele Consulting (Pty) Ltd

P O Box 6002, Halfway House, 1685

Tel: 011 207 2060

Fax: 086 674 6121

Email: [email protected]

Page 21: Appendix F-2: Process Notification Letters · 2018-06-21 · PO Box 6002 Halfway House 1685, South Africa Building 1, Maxwell Office Park, Magwa Crescent West ... The WML Variation

ENVIRONMENTAL IMPACT ASSESSMENT, WASTE MANAGEMENT LICENSE VARIATION AND WATER USE LICENCE FOR THE

PROPOSED RETROFITTING OF A FLUE GAS DESULPHURISATION (FGD) SYSTEM AT MEDUPI POWER STATION, LEPHALALE,

LIMPOPO PROVINCE

ZITHOLELE CONSULTING

We would like to express our appreciation to the stakeholders who have participated in this EIA process thus far.

Yours faithfully

Dr. Mathys Vosloo

ZITHOLELE CONSULTING (PTY) LTD

Appendix A: Comment Form

Page 22: Appendix F-2: Process Notification Letters · 2018-06-21 · PO Box 6002 Halfway House 1685, South Africa Building 1, Maxwell Office Park, Magwa Crescent West ... The WML Variation

ENVIRONMENTAL IMPACT ASSESSMENT, WASTE

MANAGEMENT LICENCE VARIATION APPLICATION

AND WATER USE LICENCE APPLICATION FOR THE

PROPOSED RETROFITTING OF A FLUE GAS

DESULPHURISATION (FGD) SYSTEM AT MEDUPI

POWER STATION, LEPHALALE, LIMPOPO PROVINCE

COMMENT SHEET : DEIR & WML VARIATION

DEIR public review until 05 April 2018 WML Variation Application public review until 09 April 2018

EIA Public Participation Office Mathys Vosloo / Lebo Petlane Zitholele Consulting (Pty) Ltd

P O Box 6002, Halfway House, 1685 Tel: 011 207 2060 Fax: 086 674 6121

Email: [email protected]

Please complete by Friday 05 April 2018 and return to the EIA Public Participation Office (as above)

TITLE

FIRST NAME

INITIALS

SURNAME

ORGANISATION

(Please do not use any acronyms)

POSTAL ADDRESS

POSTAL CODE

TEL NO

FAX NO

CELL

EMAIL

SIGNATURE

DATE

COMMENTS (Please use separate sheets if necessary)

1. I have the following concern / questions / queries.

..................................................................................................................................................................................... ..................................................................................................................................................................................... ..................................................................................................................................................................................... ..................................................................................................................................................................................... ..................................................................................................................................................................................... ..................................................................................................................................................................................... …………………………………………………………………………………………………………………………………… …………………………………………………………………………………………………………………………………… ……………………………………………………………………………………………………………………………………

2. I would like to receive further communication through the following means of communication. Email Fax SMS Mail

Please note to ensure your contact details for the communication method chosen are correctly captured above.

3. Any other comments you may have: ..................................................................................................................................................................................... .....................................................................................................................................................................................

THANK YOU FOR YOUR CONTRIBUTION

Page 23: Appendix F-2: Process Notification Letters · 2018-06-21 · PO Box 6002 Halfway House 1685, South Africa Building 1, Maxwell Office Park, Magwa Crescent West ... The WML Variation

Zitholele Consulting Reg. No. 2000/000392/07

PO Box 6002 Halfway House 1685, South Africa Building 1, Maxwell Office Park, Magwa Crescent West c/o Allandale Road & Maxwell Drive, Waterfall City, Midrand T : 011 207 2060 F : 086 674 6121 E : [email protected]

Directors : Dr. R.G.M. Heath, S. Pillay, N. Rajasakran

Our Ref : 12949-83-Let-005-PRPExt 05 April 2018

Dear Stakeholder

ENVIRONMENTAL IMPACT ASSESSMENT, WASTE MANAGEMENT LICENSE VARIATION AND WATER USE

LICENCE FOR THE PROPOSED RETROFITTING OF A FLUE GAS DESULPHURISATION (FGD) SYSTEM AT

MEDUPI POWER STATION, LEPHALALE, LIMPOPO PROVINCE

1. NOTIFICATION OF EXTENSION OF PUBLIC REVIEW PERIOD TO 19 APRIL 2018

2. NOTIFICATION OF SUBMISSION OF AMENDED EIA APPLICATION FORM TO DEA

3. AVAILABILITY OF MEETING PRESENTATIONS

4. REMINDER NOTIFICATION OF THE AVAILABILITY OF THE DEIR AND WML VARIATION APPLICATION

1. Notification of extension of public review period to 19 April 2018

This notification serves to inform all stakeholders that extension of the public review period to 19 April 2018 has

been granted to all stakeholders to allow for additional time for review and comment on the Environmental Impact

Assessment (EIA) Application and Waste Management Licence (WML) Variation Application. All stakeholders are

hereby encouraged to provide comment on the abovementioned applications on or before 19 April 2018. Details of

where the applications can be viewed and how comment can be submitted is provided in section 4 below.

2. REMINDER: Notification of submission of amended EIA Application Form to DEA

This notification serves to inform all stakeholders that an amended EIA application form (non-integrated

application) was submitted to the Department of Environmental Affairs (DEA) on 26 March 2018. Due to the

changes to the packaging of the various components of the Medupi FGD Retrofit Project, as explained in the two

Bridging Documents and DEIR, the submission of an amended EIA application form to the DEA was necessary due to

the fact that the EIA application was no longer an application for integrated environmental authorisation and waste

management licence in terms of the National Environmental Management Act, 1998 (Act No. 107 of 1998), as

amended and the Environmental Impact Assessment Regulations, 2010; and the National Environmental

Management: Waste Act, 2008 (Act No. 59 of 2008).

As a result, an application for authorisation in terms of the National Environmental Management Act, 1998 (Act No.

107 of 1998), and the Environmental Impact Assessment Regulations, 2014 only has been applied for through the

submission of the amended EIA Application Form to the DEA. A new DEA reference number will be assigned to

Medupi FGD Retrofit Project EIA process which will be communicated to all stakeholders once received.

Page 24: Appendix F-2: Process Notification Letters · 2018-06-21 · PO Box 6002 Halfway House 1685, South Africa Building 1, Maxwell Office Park, Magwa Crescent West ... The WML Variation

ENVIRONMENTAL IMPACT ASSESSMENT, WASTE MANAGEMENT LICENSE VARIATION AND WATER USE LICENCE FOR THE

PROPOSED RETROFITTING OF A FLUE GAS DESULPHURISATION (FGD) SYSTEM AT MEDUPI POWER STATION, LEPHALALE,

LIMPOPO PROVINCE

ZITHOLELE CONSULTING

The amended EIA Application Form, including the bridging documents and DEIR referred to above, is available for

do load fro Zitholele’s ebsite (www.zitholele.co.za/environmental/) under headi g EIA for Medupi FGD or

can be viewed at the public places mentioned in section 4 below.

3. REMINDER: Availability of PPP Meeting Presentations

The agendas, presentations given and attendance registers for all meetings held on 12 and 13 March 2018 are

available for download and review fro Zitholele’s ebsite www.zitholele.co.za/environmental/) under heading

EIA for Medupi FGD . Please ote the eeti g at Ditheku Primary School, Marapong, was not held due to a lack of

stakeholder attendance. An ad hoc Key Stakeholder Meeting was undertaken with representatives of the

Waterberg Environmental Justice Forum (WEJF) on 14 March 2018, who is an active Community Based Organisation

in the local communities.

4. REMINDER: DEIR and WML available for Public Review

The Draft Environmental Impact Report (DEIR) and Waste Management Licence (WML) Variation Application is

available for public review and comment until Thursday, 19 April 2018. Hard copies of the DEIR and WML Variation

Application, as well as the amended EIA Application Form, are available at the following public places:

VENUE CONTACT DETAILS

Lephalale Public Library, Civic Center Onverwacht, Cnr Joe Slovo and

Douwater Road, Lephalale Tel.: 014 762 1484 / 1453 / 1518

Marapong Community Library, 916 Phukubye Street, Marapong Tel.: 073 210 8954

Lesedi Tshukudu Thusong Centre, Steenbokpan Tel.: 082 927 2399

Agri SA, NTK Building, 1 Jan Louis Botha Avenue, Lephalale Tel.: 014 763 1888

The DEIR, WML Variation Application and EIA Application Form are a ailable for do load fro Zitholele’s ebsite (www.zitholele.co.za/environmental/) under headi g EIA for Medupi FGD , and is also available per CD on request

via email from Zitholele Consulting. These reports are also be available on the Eskom website

(http://www.eskom.co.za/OurCompany/SustainableDevelopment/EnvironmentalImpactAssessments/Pages/Enviro

nment_Impact_Assessments.aspx u der the headi g Medupi FGD .

You are requested to comment on the DEIR and WML Variation Application in any of the following ways:

Completing the comment sheet enclosed (Appendix A);

Writing a letter, or producing additional written submissions; or

Sending an e-mail or phoning the public participation office.

Contact details of the Public Participation Office:

EIA Public Participation Office: Mathys Vosloo / Lebo Petlane

Zitholele Consulting (Pty) Ltd

PO Box 6002, Halfway House, 1685

Tel: 011 207 2060

Fax: 086 674 6121

Email: [email protected]

Page 25: Appendix F-2: Process Notification Letters · 2018-06-21 · PO Box 6002 Halfway House 1685, South Africa Building 1, Maxwell Office Park, Magwa Crescent West ... The WML Variation

ENVIRONMENTAL IMPACT ASSESSMENT, WASTE MANAGEMENT LICENSE VARIATION AND WATER USE LICENCE FOR THE

PROPOSED RETROFITTING OF A FLUE GAS DESULPHURISATION (FGD) SYSTEM AT MEDUPI POWER STATION, LEPHALALE,

LIMPOPO PROVINCE

ZITHOLELE CONSULTING

We would like to express our appreciation to the stakeholders who have participated in this EIA process thus far.

Yours faithfully

Dr. Mathys Vosloo

ZITHOLELE CONSULTING (PTY) LTD

Appendix A: Comment Form

Page 26: Appendix F-2: Process Notification Letters · 2018-06-21 · PO Box 6002 Halfway House 1685, South Africa Building 1, Maxwell Office Park, Magwa Crescent West ... The WML Variation

ENVIRONMENTAL IMPACT ASSESSMENT, WASTE

MANAGEMENT LICENCE VARIATION APPLICATION

AND WATER USE LICENCE APPLICATION FOR THE

PROPOSED RETROFITTING OF A FLUE GAS

DESULPHURISATION (FGD) SYSTEM AT MEDUPI

POWER STATION, LEPHALALE, LIMPOPO PROVINCE

COMMENT SHEET : DEIR & WML VARIATION

EIA Public Participation Office Mathys Vosloo / Lebo Petlane Zitholele Consulting (Pty) Ltd

P O Box 6002, Halfway House, 1685 Tel: 011 207 2060 Fax: 086 674 6121

Email: [email protected]

Please complete by 19 April 2018 and return to the EIA Public Participation Office (as above)

TITLE

FIRST NAME

INITIALS

SURNAME

ORGANISATION

(Please do not use any acronyms)

POSTAL ADDRESS

POSTAL CODE

TEL NO

FAX NO

CELL

EMAIL

SIGNATURE

DATE

COMMENTS (Please use separate sheets if necessary)

1. I have the following concern / questions / queries.

..................................................................................................................................................................................... ..................................................................................................................................................................................... ..................................................................................................................................................................................... ..................................................................................................................................................................................... ..................................................................................................................................................................................... ..................................................................................................................................................................................... …………………………………………………………………………………………………………………………………… …………………………………………………………………………………………………………………………………… ……………………………………………………………………………………………………………………………………

2. I would like to receive further communication through the following means of communication. Email Fax SMS Mail

Please note to ensure your contact details for the communication method chosen are correctly captured above.

3. Any other comments you may have: ..................................................................................................................................................................................... .....................................................................................................................................................................................

THANK YOU FOR YOUR CONTRIBUTION

Page 27: Appendix F-2: Process Notification Letters · 2018-06-21 · PO Box 6002 Halfway House 1685, South Africa Building 1, Maxwell Office Park, Magwa Crescent West ... The WML Variation

Zitholele Consulting Reg. No. 2000/000392/07

PO Box 6002 Halfway House 1685, South Africa Building 1, Maxwell Office Park, Magwa Crescent West c/o Allandale Road & Maxwell Drive, Waterfall City, Midrand T : 011 207 2060 F : 086 674 6121 E : [email protected]

Directors : Dr. R.G.M. Heath, S. Pillay, N. Rajasakran

Our Ref : 12949-83-Let-006-FinRem 19 April 2018

Dear Stakeholder

ENVIRONMENTAL IMPACT ASSESSMENT, WASTE MANAGEMENT LICENSE VARIATION AND WATER USE

LICENCE FOR THE PROPOSED RETROFITTING OF A FLUE GAS DESULPHURISATION (FGD) SYSTEM AT

MEDUPI POWER STATION, LEPHALALE, LIMPOPO PROVINCE

1. FINAL REMINDER TO SUBMIT COMMENTS AND CONCLUSION OF PUBLIC REVIEW PERIOD

2. DEA REFERENCE NUMBER ISSUED FOR EIA APPLICATION

3. DEA REFERENCE NUMBER ISSUED FOR WML VARIATION APPLICATION

4. AVAILABILITY OF THE DEIR AND WML VARIATION APPLICATION

1. Final reminder to submit comments and conclusion of Public Review Period

This notification serves to remind all stakeholders that the public review period for review and comment on the

Draft Environmental Impact Report (DEIR) and Waste Management Licence (WML) Variation Application for the

Medupi FGD Retrofit Project is coming to an end. This notification further serves as the final reminder to all

stakeholders to submit comments relating to the DEIR and WML Variation Application before the end of Thursday

19 April 2018 to the Public Participation Office. Details of where the applications can be viewed and how comment

can be submitted is provided in section 4 below.

2. New DEA reference number issued for EIA Application

An amended EIA application form (non-integrated application) for the Medupi FGD EIA Application was submitted

to the Department of Environmental Affairs (DEA) on 26 March 2018. The DEA issued a new DEA Reference

Number, i.e. 14/12/16/3/3/2/1060, for the non-integrated application on 13 April 2018, which was communicated

via email to Zitholele Consulting on 16 April 2018. The amended EIA Application Form is available for download

fro Zitholele’s ebsite www.zitholele.co.za/environmental/ u der headi g EIA for Medupi FGD or can be

viewed at the public places mentioned in section 4 below.

3. DEA Reference number issued for WML Variation Application

A Waste Management Licence (WML) Variation Application for the Medupi FGD and Ash Disposal Facility (ADF) was

submitted to the DEA on 05 March 2018. The DEA issued a Reference Number, i.e. 12/9/11/L184515344/5/V, for

the WML Variation Application on 09 April 2018, which was communicated via email to Zitholele Consulting on 10

April 2018. The WML Variation Application is a ailable for do load fro Zitholele’s ebsite

Page 28: Appendix F-2: Process Notification Letters · 2018-06-21 · PO Box 6002 Halfway House 1685, South Africa Building 1, Maxwell Office Park, Magwa Crescent West ... The WML Variation

ENVIRONMENTAL IMPACT ASSESSMENT, WASTE MANAGEMENT LICENSE VARIATION AND WATER USE LICENCE FOR THE

PROPOSED RETROFITTING OF A FLUE GAS DESULPHURISATION (FGD) SYSTEM AT MEDUPI POWER STATION, LEPHALALE,

LIMPOPO PROVINCE

ZITHOLELE CONSULTING

(www.zitholele.co.za/environmental/ u der headi g EIA for Medupi FGD or can be viewed at the public places

mentioned in section 4 below.

4. Availability of DEIR and WML Variation Application

The Draft Environmental Impact Report (DEIR) and Waste Management Licence (WML) Variation Application is

available for public review and comment until Thursday, 19 April 2018. Hard copies of the DEIR and WML Variation

Application, as well as the amended EIA Application Form, are available at the following public places:

VENUE CONTACT DETAILS

Lephalale Public Library, Civic Center Onverwacht, Cnr Joe Slovo and

Douwater Road, Lephalale Tel.: 014 762 1484 / 1453 / 1518

Marapong Community Library, 916 Phukubye Street, Marapong Tel.: 073 210 8954

Lesedi Tshukudu Thusong Centre, Steenbokpan Tel.: 082 927 2399

Agri SA, NTK Building, 1 Jan Louis Botha Avenue, Lephalale Tel.: 014 763 1888

The DEIR, WML Variation Application and EIA Application Form are a ailable for do load fro Zitholele’s ebsite (www.zitholele.co.za/environmental/) under headi g EIA for Medupi FGD , and is also available per CD on request

via email from Zitholele Consulting. These reports are also be available on the Eskom website

(http://www.eskom.co.za/OurCompany/SustainableDevelopment/EnvironmentalImpactAssessments/Pages/Enviro

nment_Impact_Assessments.aspx u der the headi g Medupi FGD .

You are requested to comment on the DEIR and WML Variation Application in any of the following ways:

Completing the comment sheet enclosed (Appendix A);

Writing a letter, or producing additional written submissions; or

Sending an e-mail or phoning the public participation office.

Contact details of the Public Participation Office:

EIA Public Participation Office: Mathys Vosloo / Lebo Petlane

Zitholele Consulting (Pty) Ltd

PO Box 6002, Halfway House, 1685

Tel: 011 207 2060

Fax: 086 674 6121

Email: [email protected]

We would like to express our appreciation to the stakeholders who have participated in this EIA process thus far.

Yours faithfully

Dr. Mathys Vosloo

ZITHOLELE CONSULTING (PTY) LTD

Appendix A: Comment Form

Page 29: Appendix F-2: Process Notification Letters · 2018-06-21 · PO Box 6002 Halfway House 1685, South Africa Building 1, Maxwell Office Park, Magwa Crescent West ... The WML Variation

ENVIRONMENTAL IMPACT ASSESSMENT, WASTE

MANAGEMENT LICENSE VARIATION AND WATER

USE LICENCE FOR THE PROPOSED RETROFITTING

OF A FLUE GAS DESULPHURISATION (FGD) SYSTEM

AT MEDUPI POWER STATION, LEPHALALE, LIMPOPO

PROVINCE

COMMENT SHEET : DEIR & WML Variation Application

EIA Public Participation Office Mathys Vosloo / Lebo Petlane Zitholele Consulting (Pty) Ltd

P O Box 6002, Halfway House, 1685 Tel: 011 207 2060 Fax: 086 674 6121

Email: [email protected]

Please complete and return to the EIA Public Participation Office (as above)

TITLE

FIRST NAME

INITIALS

SURNAME

ORGANISATION

(Please do not use any acronyms)

POSTAL ADDRESS

POSTAL CODE

TEL NO

FAX NO

CELL

EMAIL

SIGNATURE

DATE

COMMENTS (Please use separate sheets if necessary)

1. I have the following concern / questions / queries.

..................................................................................................................................................................................... ..................................................................................................................................................................................... ..................................................................................................................................................................................... ..................................................................................................................................................................................... ..................................................................................................................................................................................... ..................................................................................................................................................................................... …………………………………………………………………………………………………………………………………… …………………………………………………………………………………………………………………………………… ……………………………………………………………………………………………………………………………………

2. I would like to receive further communication through the following means of communication. Email Fax SMS Mail

Please note to ensure your contact details for the communication method chosen are correctly captured above.

3. Any other comments you may have: ..................................................................................................................................................................................... .....................................................................................................................................................................................

THANK YOU FOR YOUR CONTRIBUTION