Draft Environmental Impact Report(Draft EIR)
[State Clearinghouse No. 2012091037]
for
Los Angeles International Airport (LAX)West Aircraft Maintenance Area Project
Volume 2
Appendix B
City of Los AngelesLos Angeles World Airports
October 2013
West Aircraft Maintenance Area Project
Draft Environmental Impact Report(Draft EIR)
[State Clearinghouse No. 2012091037]
for
Los Angeles International Airport (LAX)West Aircraft Maintenance Area Project
Volume 2
Appendix B
City of Los AngelesLos Angeles World Airports
October 2013
Los Angeles International Airport West Aircraft Maintenance Area Project Draft EIR October 2013
Page i
Table of Contents 1.0 Introduction and Executive Summary ........................................................................................... 1-1
1.1 Summary of Proposed Project ......................................................................................... 1-1 1.2 Relationship to the LAX Master Plan and EIR ................................................................. 1-2 1.3 Purpose of this EIR .......................................................................................................... 1-3 1.4 Organization of this EIR ................................................................................................... 1-3 1.5 Executive Summary of Environmental Impacts ............................................................... 1-7 1.6 Areas of Known Controversy and Issues to be Resolved................................................ 1-7
2.0 Project Description ........................................................................................................................ 2-1 2.1 Introduction ...................................................................................................................... 2-1 2.2 Location and Surrounding Uses ....................................................................................... 2-1 2.3 Existing Conditions........................................................................................................... 2-2 2.4 Project Objectives ............................................................................................................ 2-2 2.5 Project Characteristics ..................................................................................................... 2-9
2.5.1 Overview ................................................................................................................ 2-9 2.5.2 Apron Area ............................................................................................................. 2-9 2.5.3 Aircraft Maintenance Hangars ............................................................................. 2-10 2.5.4 Ancillary Facilities ................................................................................................ 2-14
2.6 Relocation and Demolition of Existing On-Site Uses ..................................................... 2-15 2.7 Construction Schedule ................................................................................................... 2-16 2.8 Grading .......................................................................................................................... 2-17 2.9 Intended Use of this EIR ................................................................................................ 2-17
2.9.1 Federal Actions ................................................................................................. 2-18 2.9.2 State Actions ..................................................................................................... 2-18 2.9.3 Local and Regional Actions ............................................................................. 2-18
3.0 Overview of Project Setting ........................................................................................................... 3-1 3.1 Introduction ...................................................................................................................... 3-1
3.1.1 Study Area .......................................................................................................... 3-1 3.1.2 Study Years ......................................................................................................... 3-1
3.2 Existing Airport Facilities .................................................................................................. 3-1 3.4 Land Use Setting .............................................................................................................. 3-2 3.5 Environmental Setting ...................................................................................................... 3-3
3.5.1 Air Quality ............................................................................................................ 3-3 3.5.2 Greenhouse Gas Emissions ............................................................................... 3-3 3.5.3 Hazards and Hazardous Materials ...................................................................... 3-3 3.5.4 Hydrology and Water Quality .............................................................................. 3-4 3.5.5 Noise ................................................................................................................... 3-4 3.5.6 Land Use and Planning........................................................................................ 3-4 3.5.7 Transportation/Traffic .......................................................................................... 3-4
3.6 Development Setting/Related Projects ............................................................................ 3-5 3.6.1 On-Airport Related Projects ................................................................................ 3-9 3.6.2 Other Related Projects ...................................................................................... 3-10
4.0 Environmental Impact Analysis ..................................................................................................... 4-1 4.1 Air Quality ...................................................................................................................... 4.1-1
4.1.1 Introduction ...................................................................................................... 4.1-1 4.1.2 Methodology ..................................................................................................... 4.1-5 4.1.3 Existing Conditions ........................................................................................ 4.1-19 4.1.4 Thresholds of Significance ............................................................................. 4.1-30 4.1.5 Applicable LAX Master Plan Commitments and Mitigation Measures ........... 4.1-38 4.1.6 Impact Analysis .............................................................................................. 4.1-43 4.1.7 Cumulative Impacts ....................................................................................... 4.1-58 4.1.8 Mitigation Measures ....................................................................................... 4.1-59
Table of Contents (continued)
Los Angeles International Airport West Aircraft Maintenance Area Project Draft EIR October 2013
Page ii
4.1.9 Level of Significance After Mitigation ............................................................. 4.1-59 4.2 Greenhouse Gas Emissions ......................................................................................... 4.2-1
4.2.1 Introduction ...................................................................................................... 4.2-1 4.2.2 Methodology ..................................................................................................... 4.2-3 4.2.3 Existing Conditions .......................................................................................... 4.2-8 4.2.4 Thresholds of Significance ............................................................................. 4.2-30 4.2.5 Applicable LAX Master Plan Commitments and Mitigation Measures ........... 4.2-31 4.2.6 Impact Analysis .............................................................................................. 4.2-35 4.2.7 Cumulative Impacts ....................................................................................... 4.2-38 4.2.8 Mitigation Measures ....................................................................................... 4.2-38 4.2.9 Level of Significance After Mitigation ............................................................. 4.2-39
4.3 Hazards and Hazardous Materials ................................................................................ 4.3-1 4.3.1 Introduction ...................................................................................................... 4.3-1 4.3.2 Methodology ..................................................................................................... 4.3-1 4.3.3 Existing Conditions .......................................................................................... 4.3-3 4.3.4 Thresholds of Significance ............................................................................. 4.3-19 4.3.5 Applicable LAX Master Plan Commitments and Mitigation Measures ........... 4.3-19 4.3.6 Impact Analysis .............................................................................................. 4.3-21 4.3.7 Cumulative Impacts ....................................................................................... 4.3-27 4.3.8 Mitigation Measures ....................................................................................... 4.3-28 4.3.9 Level of Significance After Mitigation ............................................................. 4.3-29
4.4 Hydrology and Water Quality ........................................................................................ 4.4-1 4.4.1 Introduction ...................................................................................................... 4.4-1 4.4.2 Methodology ..................................................................................................... 4.4-1 4.4.3 Existing Conditions .......................................................................................... 4.4-3 4.4.4 Thresholds of Significance ............................................................................. 4.4-18 4.4.5 Applicable LAX Master Plan Commitments and Mitigation Measures ........... 4.4-19 4.4.6 Impacts Analysis ............................................................................................ 4.4-21 4.4.7 Cumulative Impacts ....................................................................................... 4.4-29 4.4.8 Mitigation Measures ....................................................................................... 4.4-30 4.4.9 Level of Significance After Mitigation ............................................................. 4.4-30
4.5 Noise ............................................................................................................................. 4.5-1 4.5.1 Introduction ...................................................................................................... 4.5-1 4.5.2 Methodology ..................................................................................................... 4.5-4 4.5.3 Existing Conditions .......................................................................................... 4.5-8 4.5.4 Thresholds of Significance ............................................................................. 4.5-19 4.5.5 Applicable LAX Master Plan Commitments and Mitigation Measures ........... 4.5-22 4.5.6 Impact Analysis .............................................................................................. 4.5-23 4.5.7 Cumulative Impacts ....................................................................................... 4.5-35 4.5.8 Mitigation Measures ....................................................................................... 4.5-37 4.5.9 Level of Significance After Mitigation ............................................................. 4.5-37
4.6 Land Use and Planning ................................................................................................. 4.6-1 4.6.1 Introduction ...................................................................................................... 4.6-1 4.6.2 Methodology ..................................................................................................... 4.6-1 4.6.3 Existing Conditions .......................................................................................... 4.6-2 4.6.4 Thresholds of Significance ............................................................................... 4.6-4 4.6.5 Applicable LAX Master Plan Commitments and Mitigation Measures ............. 4.6-9 4.6.6 Impact Analysis ................................................................................................ 4.6-9 4.6.7 Cumulative Impacts ....................................................................................... 4.6-20 4.6.8 Mitigation Measures ....................................................................................... 4.6-20 4.6.9 Level of Significance After Mitigation ............................................................. 4.6-20
4.7 Construction Surface Transportation ............................................................................ 4.7-1 4.7.1 Introduction ...................................................................................................... 4.7-1
Table of Contents (continued)
Los Angeles International Airport West Aircraft Maintenance Area Project Draft EIR October 2013
Page iii
4.7.2 Methodology ..................................................................................................... 4.7-2 4.7.3 Existing Conditions .......................................................................................... 4.7-7 4.7.4 Project-Generated Traffic ............................................................................... 4.7-19 4.7.5 Future Cumulative Traffic ............................................................................... 4.7-22 4.7.6 Thresholds of Significance ............................................................................. 4.7-30 4.7.7 Applicable LAX Master Plan Commitments and Mitigation Measures ........... 4.7-34 4.7.8 Impact Analysis .............................................................................................. 4.7-36 4.7.9 Mitigation Measures ....................................................................................... 4.7-42 4.7.10 Level of Significance After Mitigation ............................................................. 4.7-42
5.0 Alternatives ................................................................................................................................... 5-1 5.1 Purpose and Scope.......................................................................................................... 5-1 5.2 Significant Impacts of the Project ..................................................................................... 5-2 5.3 Project Objectives ............................................................................................................ 5-2 5.4. Alternatives Considered and Rejected ............................................................................. 5-3
5.4.1. West Remote Pads/Gates Site ........................................................................... 5-3 5.4.2. Other LAX Sites .................................................................................................. 5-3
5.5 Alternatives ...................................................................................................................... 5-4 5.5.1 No Project-No Development Alternative ............................................................. 5-4 5.5.2 No Project-Existing LAX Master Plan Alternative ............................................... 5-9 5.5.3 Reduced Project Alternative ............................................................................... 5-9 5.5.4 Alternate Site Alternative .................................................................................. 5-10
5.6 Evaluation of Project Alternatives .................................................................................. 5-17 5.6.1 No Project-No Development Alternative ........................................................... 5-17 5.6.2 No Project-Existing LAX Master Plan Alternative ............................................. 5-24 5.6.3 Reduced Project Alternative ............................................................................. 5-36 5.6.4 Alternate Site Alternative .................................................................................. 5-44
5.7 Environmentally Superior Alternative ............................................................................. 5-54 6.0 Other Environmental Considerations ............................................................................................ 6-1
6.1 Significant Unavoidable Impacts ...................................................................................... 6-1 6.2 Irreversible Environmental Changes ................................................................................ 6-2 6.3 Growth Inducing Impacts ................................................................................................. 6-3
6.3.1 Project Characteristics ........................................................................................ 6-3 6.3.2 Economic Growth ................................................................................................ 6-3 6.3.3 Removal of an Impediment to Growth ................................................................ 6-3 6.3.4 Development or Encroachment into an Isolated Open Space ............................ 6-4 6.3.5 Precedent Setting Action .................................................................................... 6-4
6.4 Potential Secondary Effects ............................................................................................. 6-4 6.5 Less Than Significant Effects ........................................................................................... 6-5
7.0 List of Preparers, References, NOP and Scoping Meeting Comments, and List of Acronyms ...................................................................................................................................... 7-1 7.1 List of Preparers ............................................................................................................... 7-1 7.2 List of References ............................................................................................................ 7-3 7.3 NOP and Scoping Meeting Comments .......................................................................... 7-11 7.4 List of Acronyms ............................................................................................................. 7-12
Appendices Appendix A - Initial Study, Notice of Preparation (NOP), NOP Comments, Scoping Meeting
Materials, and Scoping Meeting Comments Appendix B - Air Quality, Greenhouse Gas, and Human Health Risk Assessment
B.1 Construction – Criteria Pollutant and Greenhouse Gas Emissions Calculations B.2 Construction – Localized Significance Thresholds (LST) Dispersion Modeling
Table of Contents (continued)
Los Angeles International Airport West Aircraft Maintenance Area Project Draft EIR October 2013
Page iv
B.3 Construction – Human Health Risk Assessment (HHRA) B.4 Construction – Cumulative Emissions Analysis B.5 Operations – Criteria Pollutant and Greenhouse Gas Emissions Calculations and
Operational HHRA Appendix C - Noise Analysis and Worksheets
C.1 Construction Noise Calculations C.2 Noise Analysis Results for the Proposed WAMA at LAX C.3 West Aircraft Maintenance Area – Taxi Noise
Appendix D - Construction Surface Transportation: Study Area Intersection and Construction Vehicle Haul Routes Analysis
List of Tables Table 1-1 Summary of Environmental Impacts Related to the Proposed Project .......................... 1-10 Table 3-1 On-Airport Related Projects ............................................................................................. 3-6 Table 4.1-1 Toxic Air Contaminants (TAC) of Concern for the Proposed Project ......................... 4.1-13 Table 4.1-2 National and California Ambient Air Quality Standards .............................................. 4.1-21 Table 4.1-3 South Coast Air Basin Attainment Status ................................................................... 4.1-23 Table 4.1-4 Southwest Coastal Los Angeles and South Coastal Los Angeles County
Monitoring Station Ambient Air Quality Data .............................................................. 4.1-27 Table 4.1-5 SCAQMD CEQA Thresholds of Significance for Air Pollutant Emissions in the
South Coast Air Basin ................................................................................................. 4.1-35 Table 4.1-6 SCAQMD CEQA Thresholds of Significance for Air Pollutant Concentrations in
the South Coast Air Basin ........................................................................................... 4.1-37 Table 4.1-7 General Air Quality Control Measures ....................................................................... 4.1-38 Table 4.1-8 Construction-Related Control Measures ..................................................................... 4.1-39 Table 4.1-9 Operations-Related Air Quality Control Measures ...................................................... 4.1-42 Table 4.1-10 Estimate Maximum Unmitigated Construction Emissions ......................................... 4.1-43 Table 4.1-11A Construction Localized Significance Threshold Analysis (Maximum Daily
Emissions) ................................................................................................................... 4.1-47 Table 4.1-11B Construction Localized Significance Threshold Analysis (Maximum Annual
Emissions) ................................................................................................................... 4.1-48 Table 4.1-12 Comparison of CalOSHA Permissible Exposure Limits to Maximum Estimated 8-
Hour On-Site Air Concentrations ................................................................................ 4.1-49 Table 4.1-13 Incremental Cancer Risk and Chronic Non-Cancer Human Health Hazards for
Maximally Exposed Individuals from Project Construction ......................................... 4.1-53 Table 4.1-14 Maximum Incremental Acute Hazard Indices for Project Construction ...................... 4.1-55 Table 4.1-15 Unmitigated Proposed Project Operational Emissions(Pounds per Day) ................... 4.1-57 Table 4.1-16 Cumulative Construction Projects Peak Daily Emissions Estimates .......................... 4.1-60 Table 4.2-1 Global Warming Potentials and Atmospheric Lifetimes of Select Greenhouse
Gases ............................................................................................................................ 4.2-3 Table 4.2-2 City of Los Angeles Green Building Code Tier 1 Requirements for Newly-
Constructed Nonresidential Buildings ......................................................................... 4.2-15 Table 4.2-3 State of California GHG Emissions ............................................................................ 4.2-29 Table 4.2-4 General Air Quality Control Measures ....................................................................... 4.2-32 Table 4.2-5 Construction-Related Control Measures .................................................................... 4.2-32 Table 4.2-6 Operations-Related Air Quality Control Measures ..................................................... 4.2-34 Table 4.2-7 Construction Greenhouse Gas Emissions .................................................................. 4.2-35 Table 4.2-8 Annual Greenhouse Gas Emissions ........................................................................... 4.2-36 Table 4.4-1 Adopted TMDLs for Santa Monica Bay......................................................................... 4.4-8 Table 4.4-2 Future TMDL Completion Schedule for Santa Monica Bay Offshore and
Nearshore ..................................................................................................................... 4.4-8
Table of Contents (continued)
Los Angeles International Airport West Aircraft Maintenance Area Project Draft EIR October 2013
Page v
Table 4.4-3 Existing Peak Stormwater Runoff Flows ..................................................................... 4.4-16 Table 4.4-4 Peak Stormwater Runoff Flows Under the Proposed Project ..................................... 4.4-24 Table 4.5-1 Common Sounds On The A-Weighted Decibel Scale .................................................. 4.5-2 Table 4.5-2 City of Los Angeles Presumed Ambient Noise Levels ................................................ 4.5-10 Table 4.5-3 City of Los Angeles Land Use Compatibility for Community Noise ............................ 4.5-11 Table 4.5-4 Representative Noise-Sensitive Receptor Locations .................................................. 4.5-13 Table 4.5-5 Existing Conditions – Run-up Activity ......................................................................... 4.5-17 Table 4.5-6 Existing Conditions Aircraft Run-up CNEL by Location .............................................. 4.5-18 Table 4.5-7 Noise Levels for Existing Conditions Run-ups by Aircraft and Location dBA, Lmax .... 4.5-20 Table 4.5-8 Estimate of Construction Noise Levels (Leq) at Off-Site Sensitive Receiver
Locations in the City of El Segundo ............................................................................ 4.5-24 Table 4.5-9 Proposed Future Conditions Run-up Activity at the proposed Project ....................... 4.5-29 Table 4.5-10 Comparison of Aircraft Run-up CNELs for Existing Conditions and Proposed
Future Conditions with the Proposed Project by Location .......................................... 4.5-30 Table 4.5-11 Noise Levels for Proposed Future Conditions Run-ups at the proposed Project by
Aircraft dBA, Lmax ......................................................................................................... 4.5-32 Table 4.6-1 Comparison of the Proposed Project to Applicable LAX Plan Goals, Policies, and
Programs ..................................................................................................................... 4.6-16 Table 4.7-1 Study Area Intersections ............................................................................................. 4.7-12 Table 4.7-2 Level of Service Thresholds and Definitions for Signalized Intersections .................. 4.7-16 Table 4.7-3 Baseline Intersection Analysis Results ....................................................................... 4.7-17 Table 4.7-4 Project Peak (August 2014) – Proposed Project-Related Construction Traffic
PCEs ........................................................................................................................... 4.7-21 Table 4.7-5 Regional Population Distribution ................................................................................. 4.7-22 Table 4.7-6 Construction Projects Concurrent with the Proposed Project Construction Period .... 4.7-26 Table 4.7-7 AM and PM Construction Peak Hour Traffic PCEs at Overall Cumulative Peak by
Project ......................................................................................................................... 4.7-29 Table 4.7-8 Proposed Project - Level of Service Analysis Results - Impact Comparison 1
Baseline Plus Project Compared to Baseline ............................................................. 4.7-37 Table 4.7-9 Proposed Project - Level of Service Analysis Results - Impact Comparison 2
Cumulative Traffic (March 2018) ................................................................................. 4.7-39 Table 5-1 Comparison of Impacts Associated with the Alternatives and Impacts of the
Proposed Project ............................................................................................................ 5-57
List of Figures Figure 2-1 Regional Map ................................................................................................................... 2-3 Figure 2-2 Aerial Photograph of Project Site ..................................................................................... 2-5 Figure 2-3 Aerial View of Airport and Surrounding Land Uses ......................................................... 2-7 Figure 2-4 Conceptual Site Plan ..................................................................................................... 2-11 Figure 3-1 Development Projects At/Adjacent to LAX ...................................................................... 3-7 Figure 4.1-1 Total Cancer Risk for Los Angeles International Airport Area .................................... 4.1-31 Figure 4.1-2 Closest Sensitive Receptor Locations ........................................................................ 4.1-33 Figure 4.1-3 Peak Impact Receptor Locations ................................................................................ 4.1-51 Figure 4.3-1 Location of Existing Soils Stockpiles ........................................................................... 4.3-11 Figure 4.3-2 Location and Extent of Free-Phase Jet Fuel Plume ................................................... 4.3-15 Figure 4.3-3 Existing Groundwater Recovery and Monitoring Wells ............................................... 4.3-17 Figure 4.4-1 Drainage Sub-basins................................................................................................... 4.4-11 Figure 4.4-2 Existing Drainage Facilities ......................................................................................... 4.4-13 Figure 4.5-1 Existing Run-up Locations .......................................................................................... 4.5-15 Figure 4.5-2 Proposed Future Run-up Locations ........................................................................... 4.5-27
Table of Contents (continued)
Los Angeles International Airport West Aircraft Maintenance Area Project Draft EIR October 2013
Page vi
Figure 4.6-1 LAX Plan Areas ............................................................................................................. 4.6-5 Figure 4.6-2 LAX Specific Plan Sub-Areas ....................................................................................... 4.6-7 Figure 4.6-3 Summary of Refinements to LAX Master Plan ........................................................... 4.6-11 Figure 4.7-1 Construction Traffic Analysis Study Area...................................................................... 4.7-9 Figure 4.7-2 Construction Traffic Study Analysis Area Intersections .............................................. 4.7-13 Figure 4.7-3 Proposed Project Construction Vehicle Routes and Trip Distribution ........................ 4.7-23 Figure 4.7-4 Estimated Employee Hours for Proposed Project and Other Concurrent
Construction Projects .................................................................................................. 4.7-27 Figure 4.7-5 Employee Parking and Staging Locations for Proposed Project and Other
Projects at Construction Peak ..................................................................................... 4.7-31 Figure 5-1 Locations of Alternatives Evaluated in EIR ...................................................................... 5-5 Figure 5-2 No Project-No Development Alternative .......................................................................... 5-7 Figure 5-3 No Project-Existing LAX Master Plan Alternative .......................................................... 5-11 Figure 5-4 Reduced Project Alternative .......................................................................................... 5-13 Figure 5-5 Alternate Site Alternative ............................................................................................... 5-15
APPENDIX B
Air Quality, Greenhouse Gas, and Human Health Risk Assessment
WestAircraftMaintenanceAreaProjectDraftEIRAppendixBAirQuality,GreenhouseGas,andHumanHealthRiskAssessment
B.1 Construction–CriteriaPollutantandGreenhouseGasEmissionsCalculationsB.2 Construction–LocalizedSignificanceThresholds(LST)DispersionModelingB.3 Construction–HumanHealthRiskAssessment(HHRA)B.4 Construction–CumulativeEmissionsAnalysisB.5 Operations–CriteriaPollutantandGreenhouseGasEmissionsCalculationsand
OperationalHHRA
AppendixB.1Construction–CriteriaPollutantandGreenhouseGasEmissionsCalculations
ConstructionModelInputs–Activities/Crew,Equipment,andSchedule CriteriaPollutants–ConstructionEmissionsSummary(MaximumDaily&Annual) CriteriaPollutants–ExportHaulTruckOn‐Road/Off‐SiteEmissions CriteriaPollutants–BatchPlantTruckOn‐Road/On‐SiteEmissions CriteriaPollutants–Gas‐fueledVehicles/EquipmentOn‐Road/On‐SiteEmissions CriteriaPollutants–RoadDustEmissionFactors(PM10&PM2.5) CriteriaPollutants–CalEEModOff‐Road/On‐Site,WorkerCommute,VendorTruck
DeliveryEmissions(PoundsperDay)o Year1(2014)o Year2(2015)o Years3‐5(2016‐2018)
GHGs–ConstructionEmissionsSummary GHGs–ExportHaulTruckOn‐Road/Off‐SiteEmissions GHGs–BatchPlantTruckOn‐Road/On‐SiteEmissions GHGs–Gas‐fueledVehicles/EquipmentOn‐Road/On‐SiteEmissions CriteriaPollutantandGHGs–CalEEModOff‐Road/On‐Site,WorkerCommute,Vendor
TruckDeliveryEmissions(TonsperYear)o Year1(2014)o Year2(2015)o Years3‐5(2016‐2018)
CalEEModMitigationReportso Year1(2014)o Year2(2015)o Years3‐5(2016‐2018)
SCAQMDRule403FugitiveDust
AppendixB.1Construction–CriteriaPollutantandGreenhouseGasEmissionsCalculations
ConstructionModelInputs–Activities/Crew,Equipment,andSchedule
LAX/
LAW
A W
est A
ircra
ft M
aint
enan
ce A
rea
Proj
ect
Dra
ft EI
R A
ir Q
ualit
y A
naly
sis
Con
stru
ctio
n M
odel
Inpu
ts: E
quip
men
t and
Sch
edul
e Pa
ram
eter
s
Con
stru
ctio
n A
ctiv
ity C
rew
No.
of
Uni
tsEq
uipm
ent
2014
2015
2016
2017
2018
Adm
inis
trat
ive
Supp
ort
12Ja
n-D
ecJa
n-Ju
lO
ct-D
ecJa
n-D
ecJa
n-M
ar1
1 - S
UV
Gas
240
48
8 - P
icku
psG
as23
06
11
- Fue
l Tru
ckD
iese
l17
08
11
- Mec
hani
cs T
ruck
s w
/ Cra
neD
iese
l20
08
11
- Vac
um S
wee
per
Die
sel
170
8En
viro
nmen
tal C
rew
2Ja
n-Fe
bJu
n-Ju
l1
1 - P
icku
pG
as23
08
Fenc
e C
rew
2Ja
nFe
b/A
pr/J
un-J
ulO
ctM
ar1
1 - P
icku
pG
as23
04
11
- Fla
t Bed
Tru
ckD
iese
l20
04
Mis
cella
neou
s La
bor C
rew
5Ja
n-D
ecJa
n-Ju
lO
ct-D
ecJa
n-D
ecJa
n-M
ar1
1 - P
icku
pG
as23
08
11
- CA
T 42
8 B
ackh
oeD
iese
l83
8C
rush
er C
rew
4Fe
b1
1 - P
icku
pG
as23
04
22
- CA
T 98
8 Lo
ader
sD
iese
l47
58
11
- Cru
sher
Die
sel
450
8Su
rvey
Cre
w8
Jan-
Dec
Jan-
Jul
Oct
-Dec
Jan-
Apr
11
- Pic
kup
Gas
230
42
2 - C
rew
Van
sG
as18
06
Qua
lity
Con
trol
Tea
m5
Jan-
Dec
Jan-
Jul
Oct
-Dec
Jan-
Dec
Feb-
Mar
55
- Pic
kups
Gas
230
8B
atch
Pla
nt C
rew
6Ju
l-Dec
*†Ja
n-Fe
b*†
Oct
-Dec
†1
1 - P
icku
pG
as23
04
22
- CA
T 98
8 Lo
ader
sD
iese
l47
58
PCC
P Pa
ving
Cre
w37
Jul-D
ec*
Jan-
Feb*
11
- Gom
aco
GP
-400
0 P
aver
Die
sel
450
82
2 - G
omac
o R
TP-5
00 B
elt P
lace
rsD
iese
l20
08
11
- Gom
aco
TC-4
00 C
ure
/Tex
ture
Rig
Die
sel
708
22
- Com
pres
sors
(Gan
g D
rills
)D
iese
l85
83
3 - P
icku
psG
as23
06
22
- 1 T
on F
lat B
eds
Gas
200
61
1 - W
ater
Tru
ckD
iese
l23
04
22
- Wal
k B
ehin
d S
aws
Gas
108
1313
- Tr
i-axl
e D
ump
Truc
ks
Die
sel
350
8
Sche
dule
Tota
l Pe
rson
s on
Cre
wFu
el T
ype
HP
per
Ea.
Max
. D
aily
Hrs
.
Con
stru
ctio
n A
ctiv
ity C
rew
No.
of
Uni
tsEq
uipm
ent
2014
2015
2016
2017
2018
Sche
dule
Tota
l Pe
rson
s on
Cre
wFu
el T
ype
HP
per
Ea.
Max
. D
aily
Hrs
.G
radi
ng C
rew
10Fe
b-N
ov*‡
11
- CA
T 14
H M
otor
Gra
der
Die
sel
220
81
1 - C
AT
966
Load
erD
iese
l23
58
11
- CA
T R
M35
0B R
ecla
imer
Die
sel
500
82
2 - C
AT
CS
583
E C
ompa
ctor
sD
iese
l15
08
11
- CA
T 33
0C L
Exc
avat
orD
iese
l24
78
11-
CA
T 62
3 S
crap
erD
iese
l33
08
11
- Wat
er T
ruck
Die
sel
230
41
1 - P
icku
pG
as23
06
88
- Tri-
axle
Dum
p Tr
ucks
Die
sel
350
8Ex
cava
tion
Cre
w14
Feb-
Jun*
11
- CA
T 96
6 Lo
ader
Die
sel
235
82
2 - C
AT
330C
L E
xcav
ator
Die
sel
247
81
1 - W
ater
Tru
ckD
iese
l23
04
11
- Pic
kup
Gas
230
68
8 - T
ri-ax
le D
ump
Truc
ks
Die
sel
350
8El
ectr
ical
Cre
w4
Jun-
Dec
Jan-
Apr
Dec
Jan
11
- CA
T 42
8 B
ackh
oeD
iese
l83
81
1 - D
itch
Witc
h R
T 55
Tre
nche
rD
iese
l60
82
2 - P
icku
psG
as23
06
AC
P Pa
ving
Cre
w22
Jun-
Dec
Jan-
Feb/
Apr
-Jul
Dec
Jan
11
- Bar
ber-
Gre
ene
BG
260C
Pav
erD
iese
l17
48
22
- CA
T C
B 6
34D
Rol
lers
Die
sel
145
81
1 - C
AT
PS
300
B R
ubbe
r Tire
Die
sel
998
11
- CA
T IT
14G
Loa
der
Die
sel
908
11
- Pic
kup
Gas
230
81
1 - F
lat B
ed T
ruck
Die
sel
200
213
13 -
Tri-a
xle
Dum
p Tr
ucks
D
iese
l35
08
Strip
ing
Cre
w3
Aug
-Sep
Jan-
Feb/
May
-Jul
11
- Pai
nt T
ruck
Die
sel
175
81
1 - F
lat B
ed T
ruck
Die
sel
200
63
3 - P
arki
ng L
ot P
aint
Mac
hine
sG
as5
81
1 - P
icku
pG
as23
04
Dra
inag
e C
rew
8Ju
l-Aug
Apr
/Jun
11
- CA
T 33
0C L
Exc
avat
orD
iese
l24
78
11
- CA
T 96
6 Lo
ader
Die
sel
235
81
1 - C
AT
CS
531
D C
ompa
ctor
Die
sel
145
81
1 - F
lat B
ed T
ruck
Die
sel
200
41
1 - P
icku
pG
as23
06
22
- Tri-
axle
Dum
p Tr
ucks
(On
site
)D
iese
l35
08
Con
stru
ctio
n A
ctiv
ity C
rew
No.
of
Uni
tsEq
uipm
ent
2014
2015
2016
2017
2018
Sche
dule
Tota
l Pe
rson
s on
Cre
wFu
el T
ype
HP
per
Ea.
Max
. D
aily
Hrs
.B
ackf
ill C
rew
6A
pr-D
ecJa
n-Fe
b1
1 - P
icku
pG
as23
04
11
- CA
T 96
6 Lo
ader
Die
sel
235
81
1 - S
heep
foot
Rol
ler
Die
sel
232
8Sa
w C
rew
4Ju
l-Aug
/Nov
-Dec
Jan-
Apr
22
- 1 T
on T
ruck
s w
/ Lift
Gas
230
81
1 - W
ater
Tru
ckD
iese
l23
08
11
- Vac
um S
wee
per
Die
sel
998
44
- Wal
k B
ehin
d S
aws
Gas
108
Dem
oliti
on C
rew
15Ja
nA
pr2
2 - C
AT
988
Load
ers
Die
sel
475
81
1 - A
ir C
ompr
esso
rD
iese
l17
08
22-
CA
T 33
0 E
xcav
ator
Die
sel
247
81
1 - P
icku
pG
as23
06
88
- Tri-
axle
Dum
p Tr
ucks
D
iese
l35
08
Fini
sh S
aw &
Sea
ling
Cre
w5
Aug
May
-Jul
11
- Air
Com
pres
sor
Die
sel
858
11
- Tru
ck w
ith S
ilico
n P
ump
Die
sel
200
83
3 - W
alk
Beh
ind
Saw
sG
as10
82
2 - P
icku
psG
as23
06
Fuel
Lin
e/U
nder
grou
nd U
tiliti
es In
stal
latio
n C
rew
18Ju
n-D
ecJa
n-Fe
b1
1 - P
icku
pG
as23
06
22
- Cre
w V
ans
Gas
180
41
1 - C
AT
330C
L E
xcav
ator
Die
sel
247
82
2 - C
AT
966
Load
ers
Die
sel
235
82
2 - T
ruck
/Tra
ctor
Low
Boy
sD
iese
l40
08
11
- CA
T 42
8 B
ackh
oeD
iese
l83
83
3 - T
ri-ax
le D
ump
Truc
ks
Die
sel
350
81
1 - S
heep
foot
Rol
ler
Die
sel
232
81
1 - A
ir C
ompr
esso
rD
iese
l85
62
2-A
rc W
elde
rsD
iese
l30
8Fo
unda
tion
Cre
w14
Jul-A
ugO
ct-D
ec1
1-P
icku
pG
as23
06
11
- Air
Com
pres
sor
Die
sel
170
81
Dee
re 2
10LJ
Ski
ploa
der
Die
sel
848
11
- CA
T 42
8 B
ackh
oeD
iese
l83
83
3 - T
ri-ax
le D
ump
Truc
ks
Die
sel
350
81
1 10
CY
Rea
dy M
ix T
ruck
sD
iese
l35
08
11-
Gra
dall
544D
Hi L
iftD
iese
l12
58
11-
Han
d To
ols
Gas
170
8
Con
stru
ctio
n A
ctiv
ity C
rew
No.
of
Uni
tsEq
uipm
ent
2014
2015
2016
2017
2018
Sche
dule
Tota
l Pe
rson
s on
Cre
wFu
el T
ype
HP
per
Ea.
Max
. D
aily
Hrs
.C
lear
and
Gru
b C
rew
10Ja
n1
1-P
icku
pG
as23
06
11-
CA
T 97
3 Tr
ack
Load
erD
iese
l35
08
1W
ater
Tru
ckD
iese
l23
08
33
- Tri-
axle
Dum
p Tr
ucks
(On
Site
)D
iese
l35
08
11-
Han
d To
ols
Gas
170
8St
ruct
ural
Ste
el C
rew
11S
ep-O
ctJa
n-A
ug1
1-P
icku
pG
as23
06
11-
Man
itow
oc 1
1000
Cra
neD
iese
l33
28
11-
Gra
dall
544D
Hi L
iftD
iese
l12
58
22-
JLG
460
SJ
Wor
k P
latfo
rmD
iese
l50
81
1-H
and
Tool
sG
as17
08
Inte
rior R
ough
Cre
w15
Nov
-Dec
Sep
-Nov
22-
Pic
kup
Gas
230
64
4-JL
G 4
60S
J W
ork
Pla
tform
Die
sel
508
Inte
rior C
oncr
ete
Floo
ring
20Fe
b-M
ar1
1-P
icku
pG
as23
06
1P
utzm
eist
er C
oncr
ete
Pum
pD
iese
l35
08
18-
Con
cret
e M
ixer
sD
iese
l35
08
11-
Han
d To
ols
Gas
170
8B
uild
ing
Syst
ems
Cre
w14
Nov
-Dec
*Ja
n-A
prS
ep-D
ecJa
n-Fe
b1
1-P
icku
pG
as23
06
11-
Gra
dall
544D
Hi L
iftD
iese
l12
58
33-
JLG
460
SJ
Wor
k P
latfo
rmD
iese
l50
8In
terio
r Fin
ishe
s C
rew
15M
ar-J
ulD
ecJa
n-Fe
b2
2-P
icku
pG
as23
06
33-
JLG
460
SJ
Wor
k P
latfo
rmD
iese
l50
8In
stal
latio
n C
rew
8M
ay-J
ulS
ep-D
ecJa
n-Fe
b2
2-P
icku
pG
as23
06
33-
Gra
dall
544D
Hi L
iftD
iese
l12
58
Ligh
ting
- Nig
ht S
hift
Jul-D
ecJa
n/M
ay-J
ul12
12 -
Ligh
t Pla
nts
Die
sel
158
LAW
A/C
M S
taff
10Ja
n-D
ecJa
n-Ju
lO
ct-D
ecJa
n-D
ecJa
n-M
ar4
4 - P
icku
ps fo
r LA
WA
/CM
Gas
175
46
6 - P
icku
ps fo
r Ins
pect
ors
Gas
175
8S
ourc
e: C
DM
Sm
ith, 2
013;
PC
R S
ervi
ces
Cor
pora
tion,
201
3.N
otes
:*
Equ
ipm
ent n
umbe
rs w
ere
doub
led
for t
his
activ
ity to
acc
ount
for t
he p
oten
tial o
verla
ppin
g of
two
crew
s du
ring
a w
orst
-cas
e da
y du
ring
all o
r a p
ortio
n of
the
mon
ths.
† ‡In
add
ition
to th
e eq
uipm
ent l
iste
d, a
dditi
onal
em
issi
ons
wer
e ca
lcul
ated
for o
n-ro
ad/o
ff-si
te e
xpor
t hau
l tru
cks
trans
porti
ng m
ater
ial f
rom
the
site
to o
ff-si
te a
reas
. R
efer
to th
e H
aul T
ruck
On-
Roa
d/O
ff-S
ite e
mis
sion
s ca
lcul
atio
ns p
rovi
ded
in th
e fo
llow
ing
page
s.
In a
dditi
on to
the
equi
pmen
t lis
ted,
add
ition
al e
mis
sion
s w
ere
calc
ulat
ed fo
r on-
road
/on-
site
bat
ch p
lant
truc
ks tr
ansp
ortin
g m
ater
ial f
rom
the
batc
h pl
ant t
o on
-site
are
as.
Ref
er to
the
Bat
ch P
lant
, On-
Roa
d/O
n-S
ite
emis
sion
s ca
lcul
atio
ns p
rovi
ded
in th
e fo
llow
ing
page
s.
AppendixB.1Construction–CriteriaPollutantandGreenhouseGasEmissionsCalculations
CriteriaPollutants–ConstructionEmissionsSummary(MaximumDaily&Annual)
LAX/LA
WA West A
ircraft M
ainten
ance Area Project
Draft EIR Air Qua
lity An
alysis
Maxim
um Regiona
l On‐Site and
Off‐Site
Con
struction Em
ission
s for Year 1
(pou
nds p
er day)
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec
Constructio
n On‐Site ‐ Diesel Equ
ipmen
t 2
VOC
5.40
9.07
7.58
7.95
7.95
10.80
27.24
41.07
39.11
25.53
28.83
26.84
NOx
104.70
16
7.67
13
8.95
14
6.01
14
6.01
19
5.12
41
5.86
42
5.05
37
3.80
36
9.69
37
9.68
31
2.63
CO
120.76
19
2.15
15
9.96
16
7.88
16
7.88
22
4.38
46
2.78
47
3.54
41
1.28
40
6.66
41
9.71
34
3.30
SO
20.22
0.35
0.29
0.31
0.31
0.41
0.85
0.87
0.75
0.75
0.75
0.61
Fugitiv
e PM
1015
.31
10.05
10.05
10.19
10.19
10.19
12.20
12.20
12.20
12.20
12.20
9.53
Exhaust P
M10
10.79
1.25
1.03
1.09
1.09
1.71
3.79
3.87
3.67
3.64
4.58
4.55
PM10
Total
16.11
11.29
11.08
11.27
11.27
11.89
15.99
16.07
15.87
15.84
16.78
14.08
Fugitiv
e PM
2.5
7.88
5.23
5.23
5.25
5.25
5.25
5.48
5.48
5.48
5.48
5.48
4.15
Exhaust P
M2.5
0.76
1.20
0.99
1.04
1.04
1.63
3.63
3.70
3.51
3.48
4.38
4.36
PM2.5 To
tal
8.64
6.44
6.23
6.30
6.30
6.88
9.11
9.17
8.99
8.96
9.86
8.51
Constructio
n On‐Site ‐ Gas Equ
ipmen
t 2
VOC
0.72
0.70
0.65
0.67
0.67
0.78
1.15
1.35
1.09
1.00
1.15
1.13
NOx
2.22
2.15
2.02
2.09
2.09
2.42
3.57
4.17
3.37
3.10
3.57
3.50
CO8.07
7.82
7.34
7.58
7.58
8.80
12.96
15.16
12.23
11.25
12.96
12.71
SO2
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.01
0.00
0.00
0.00
0.00
Fugitiv
e PM
100.12
0.12
0.11
0.11
0.11
0.13
0.19
0.23
0.18
0.17
0.19
0.19
Exhaust P
M10
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.01
0.00
0.00
0.00
0.00
PM10
Total
0.12
0.12
0.11
0.12
0.12
0.13
0.20
0.23
0.19
0.17
0.20
0.19
Fugitiv
e PM
2.5
0.03
0.03
0.03
0.03
0.03
0.03
0.05
0.06
0.05
0.04
0.05
0.05
Exhaust P
M2.5
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
PM2.5 To
tal
0.03
0.03
0.03
0.03
0.03
0.04
0.06
0.06
0.05
0.05
0.06
0.05
Estim
ated
Maxim
um Daily Con
struction Em
ission
s with
Project Design Features (P
ound
s per Day) ‐ 201
4*Q1
Q2
Q3
Q4
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec
Constructio
n Off‐Site
VOC
2.48
9.34
9.12
9.45
9.45
3.86
9.00
9.44
8.34
8.17
9.39
8.83
NOx
0.85
163.97
16
3.91
16
4.00
16
4.00
1.21
6.90
7.02
6.73
6.69
7.00
6.86
CO7.24
43.19
42.55
43.51
43.51
11.22
28.28
29.55
26.37
25.89
29.39
27.80
SO2
0.01
0.44
0.44
0.44
0.44
0.02
0.05
0.05
0.05
0.05
0.05
0.05
Fugitiv
e PM
101.00
11.01
10.92
11.06
11.06
1.56
3.53
3.71
3.26
3.19
3.68
3.46
Exhaust P
M10
0.01
0.28
0.28
0.28
0.28
0.02
0.13
0.13
0.12
0.12
0.13
0.12
PM10
Total
1.01
11.28
11.19
11.33
11.33
1.57
3.65
3.83
3.38
3.31
3.81
3.58
Fugitiv
e PM
2.5
0.26
3.01
2.99
3.02
3.02
0.41
0.94
0.99
0.87
0.85
0.98
0.92
Exhaust P
M2.5
0.01
0.26
0.26
0.26
0.26
0.02
0.12
0.12
0.11
0.11
0.12
0.11
PM2.5 To
tal
0.28
3.26
3.24
3.27
3.27
0.43
1.06
1.10
0.98
0.96
1.10
1.04
Total O
n‐Site and
Off‐Site
3
VOC
8.60
19.11
17.36
18.08
18.08
15.45
37.39
51.86
48.54
34.70
39.37
36.81
NOx
107.78
33
3.79
30
4.88
31
2.10
31
2.10
19
8.75
42
6.33
43
6.24
38
3.90
37
9.47
39
0.25
32
2.99
CO
136.08
24
3.16
20
9.85
21
8.96
21
8.96
24
4.41
50
4.02
51
8.25
44
9.87
44
3.80
46
2.06
38
3.82
SO
20.24
0.79
0.73
0.75
0.75
0.43
0.90
0.92
0.81
0.80
0.81
0.66
Fugitiv
e PM
1016
.43
21.17
21.08
21.36
21.36
11.87
15.92
16.13
15.64
15.56
16.08
13.18
Exhaust P
M10
10.81
1.53
1.31
1.37
1.37
1.73
3.92
4.00
3.79
3.76
4.71
4.68
PM10
Total
17.24
22.71
22.39
22.73
22.73
13.60
19.84
20.13
19.44
19.32
20.79
17.86
Fugitiv
e PM
2.5
8.17
8.28
8.25
8.30
8.30
5.70
6.47
6.52
6.39
6.37
6.51
5.12
Exhaust P
M2.5
0.78
1.46
1.25
1.30
1.30
1.65
3.75
3.82
3.63
3.59
4.50
4.48
PM2.5 To
tal
8.95
9.73
9.50
9.60
9.60
7.35
10.22
10.34
10.02
9.97
11.01
9.60
Estim
ated
Con
struction Em
ission
s with
Project Design Features (P
ound
s per Day) ‐ 201
4*Q1
Q2
Q3
Q4
Maxim
um by Qua
rter
On‐Site
Off‐Site
Total
On‐Site
Off‐Site
Total
On‐Site
Off‐Site
Total
On‐Site
Off‐Site
Total
VOC
9.77
9.34
19.11
8.62
9.45
18.08
42.42
9.44
51.86
29.99
9.39
39.37
NOx
169.82
16
3.97
33
3.79
14
8.10
16
4.00
31
2.10
42
9.23
7.02
436.24
38
3.25
7.00
390.25
CO
199.97
43
.19
243.16
17
5.46
43
.51
244.41
48
8.70
29
.55
518.25
43
2.67
29
.39
462.06
SO
20.35
0.44
0.79
0.31
0.44
0.75
0.87
0.05
0.92
0.76
0.05
0.81
Fugitiv
e PM
1010
.16
11.01
21.17
10.30
11.06
21.36
12.43
3.71
16.13
12.40
3.68
16.08
Exhaust P
M10
11.25
0.28
1.53
1.09
0.28
1.73
3.87
0.13
4.00
4.59
0.13
4.71
PM10
Total
11.41
11.29
22.71
11.39
11.34
23.08
16.30
3.83
20.13
16.98
3.81
20.79
Fugitiv
e PM
2.5
5.27
3.01
8.28
5.28
3.02
8.30
5.54
0.99
6.52
5.53
0.98
6.51
Exhaust P
M2.5
1.20
0.26
1.46
1.04
0.26
1.65
3.70
0.12
3.82
4.39
0.12
4.50
PM2.5 To
tal
6.47
3.26
9.73
6.33
3.27
9.60
9.24
1.10
10.34
9.92
1.10
11.01
Tons per Qua
rter
Work da
ys in th
e mon
th23
20
21
22
22
21
23
21
22
23
20
23
VOC
0.47
0.56
1.51
1.22
NOx
7.78
8.95
13.71
11.98
CO6.20
7.38
16.19
14.14
SO2
0.02
0.02
0.03
0.02
Fugitiv
e PM
100.62
0.59
0.52
0.49
Exhaust P
M10
10.04
0.05
0.13
0.14
PM10
Total
0.66
0.64
0.65
0.64
Fugitiv
e PM
2.5
0.26
0.24
0.21
0.20
Exhaust P
M2.5
0.04
0.05
0.12
0.14
PM2.5 To
tal
0.30
0.29
0.34
0.34
Source: C
alifo
rnia Emissions Estim
ator M
odel (C
alEEMod
, versio
n 20
13.2).
*To
tals may not add
up exactly
due
to ro
unding
in th
e mod
eling calculations and
/or u
se of the
highe
r of the
winter o
r sum
mer calculatio
ns.
1. 2. 3.
Outlined
num
bers indicates the
mon
th with
the maxim
um on‐site em
issions (the
sum of o
n‐site diesel and
gas equ
ipmen
t emissions). PM10
and
PM2.5 are based on
the total particulate em
issions (the
sum of o
n‐site
fugitiv
e du
st and
exhaust emissions).
Shaded
and
outlined
num
bers indicates the
mon
th with
the maxim
um to
tal emissions (the
sum of o
n‐site and off‐site
emissions). PM10
and
PM2.5 are based on
the total particulate em
issions (the
sum of fugitive dust
and exhaust e
missions).
Due an
app
aren
t calculatio
n error in the CalEEM
od (V
ersio
n 20
13.2) softw
are, th
e "m
itigated" PM10
off‐road
diesel exhaust emissions are erron
eously sh
own to be less th
an th
e "m
itigated" PM2.5 off‐road diesel
exhaust e
missions fo
r Year 2
014. For disp
ersio
n mod
eling pu
rposes, the
"mitigated" PM10
off‐road
exhaust emissions were adjusted
according
to th
e following eq
uatio
n: PM10
= PM2.5 / 0
.957
in accordance with
the
California Air R
esou
rces Board's, "California Em
ission Inventory and Re
porting System
(CEIDA
RS) ‐ Particulate Matter (PM
) Spe
ciation Profiles." Profile ID 609
9 (off‐road
diesel veh
icle exhaust) d
enotes th
at th
e no
rmalize
d fractio
n of PM10
that is PM2.5 is approxim
ately 0.95
7. (http://w
ww.arb.ca.gov/ei/spe
ciate/dn
ldop
tvv100
01.php
)
Estim
ated
Con
struction Em
ission
s with
Project Design Features (T
ons p
er Qua
rter) ‐ 201
4*Qtr. 1
Qtr. 2
Qtr. 3
Qtr. 4
Estim
ated
Con
struction Em
ission
s with
Project Design Features (P
ound
s per Day) ‐ 201
4*Qtr. 1
Qtr. 2
Qtr. 3
Qtr. 4
LAX/LA
WA West A
ircraft M
ainten
ance Area Project
Draft EIR Air Qua
lity An
alysis
Maxim
um Regiona
l On‐Site and
Off‐Site
Con
struction Em
ission
s for Year 1
(ton
s per year)
Source
ROG
NOx
COSO
2Fugitiv
e PM
10Exha
ust
PM10
1PM
10 Total
Fugitiv
e PM
2.5
Exha
ust
PM2.5
PM2.5
Total
On‐Site Diesel
2.6
34.6
38.7
0.1
1.5
0.3
1.8
0.7
0.3
1.0
On‐Site Gas
0.1
0.4
1.4
0.0
0.0
0.0
0.0
0.0
0.0
0.0
Off‐Site
0.9
7.1
3.7
0.0
0.7
0.0
0.7
0.2
0.0
0.2
Total
3.7
42.1
43.8
0.1
2.2
0.4
2.5
0.9
0.3
1.3
Source: C
alifo
rnia Emissions Estim
ator M
odel (C
alEEMod
, versio
n 20
13.2).
1.
Estim
ated
Maxim
um Ann
ual Con
struction Em
ission
s with
Project Design Features (T
ons p
er Year) ‐ 20
14
Due an
app
aren
t calculatio
n error in the CalEEM
od (V
ersio
n 20
13.2) softw
are, th
e "m
itigated" PM10
off‐road
diesel exhaust emissions are erron
eously sh
own to be less th
an th
e "m
itigated" PM2.5 off‐road diesel exhaust emissions fo
r Year 2
014. For disp
ersio
n mod
eling pu
rposes, the
"mitigated" PM10
off‐road
exhaust emissions were adjusted
according
to
the following eq
uatio
n: PM10
= PM2.5 / 0
.957
in accordance with
the California Air R
esou
rces Board's, "California Em
ission Inventory and Re
porting System
(CEIDA
RS) ‐ Particulate
Matter (PM
) Spe
ciation Profiles." Profile ID 609
9 (off‐road
diesel veh
icle exhaust) d
enotes th
at th
e no
rmalize
d fractio
n of PM10
that is PM2.5 is approxim
ately 0.95
7.
(http://www.arb.ca.gov/ei/spe
ciate/dn
ldop
tvv100
01.php
)
Year
2014
2014
2014
2014
LAX/LA
WA West A
ircraft M
ainten
ance Area Project
Draft EIR Air Qua
lity An
alysis
Maxim
um Regiona
l On‐Site and
Off‐Site
Con
struction Em
ission
s for Year 2
(pou
nds p
er day)
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec
Constructio
n On‐Site ‐ Diesel Equ
ipmen
t 1
VOC
32.88
31.82
7.98
10.23
20.73
21.49
20.78
‐
‐
‐
‐
‐
NOx
203.98
203.12
80
.55
117.72
75
.75
88.40
76.62
‐
‐
‐
‐
‐
CO33
3.00
347.01
14
5.23
21
8.62
12
5.74
15
0.62
127.49
‐
‐
‐
‐
‐
SO2
0.60
0.63
0.24
0.37
0.21
0.26
0.22
‐
‐
‐
‐
‐
Fugitiv
e PM
1010
.06
11.23
2.35
3.52
2.35
3.52
3.52
‐
‐
‐
‐
‐
Exhaust P
M10
2.65
2.07
1.60
1.81
1.58
1.65
1.58
‐
‐
‐
‐
‐
PM10
Total
12.71
13.30
3.94
5.34
3.93
5.18
5.11
‐
‐
‐
‐
‐
Fugitiv
e PM
2.5
4.21
4.85
1.29
1.94
1.29
1.94
1.94
‐
‐
‐
‐
‐
Exhaust P
M2.5
2.55
1.96
1.48
1.70
1.54
1.61
1.55
‐
‐
‐
‐
‐
PM2.5 To
tal
6.75
6.81
2.78
3.64
2.83
3.55
3.48
‐
‐
‐
‐
‐
Constructio
n On‐Site ‐ Gas Equ
ipmen
t 1
VOC
1.08
1.14
0.88
0.90
0.84
0.90
0.88
‐
‐
‐
‐
‐
NOx
3.53
3.73
2.88
2.94
2.75
2.94
2.88
‐
‐
‐
‐
‐
CO12
.06
12.73
9.82
10.05
9.38
10.05
9.82
‐
‐
‐
‐
‐
SO2
0.00
0.01
0.00
0.00
0.00
0.00
0.00
‐
‐
‐
‐
‐
Fugitiv
e PM
100.20
0.21
0.16
0.16
0.15
0.16