4
Appendix B Study Team

Appendix B Study Teameisdocs.dsdip.qld.gov.au/New Acland Coal Mine Stage 3/EIS...B.Sci.Env, Cert. Ag; 40 years B.Sc A.E.S; 20 years 5. Surface Water Resources All Fiona Stark – SKM

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Appendix B Study Teameisdocs.dsdip.qld.gov.au/New Acland Coal Mine Stage 3/EIS...B.Sci.Env, Cert. Ag; 40 years B.Sc A.E.S; 20 years 5. Surface Water Resources All Fiona Stark – SKM

Appendix BStudy Team

Page 2: Appendix B Study Teameisdocs.dsdip.qld.gov.au/New Acland Coal Mine Stage 3/EIS...B.Sci.Env, Cert. Ag; 40 years B.Sc A.E.S; 20 years 5. Surface Water Resources All Fiona Stark – SKM

New Acland Coal Mine Stage 3 Project–Environmental Impact Statement PAGE 1

Appendix B – Study Team The qualifications and experience of the study team and specialist consultants are listed below.

ChapNo.

Chapter Name StudyComponent

Team Member Name and Company

Qualifications and experience

All All All David Genn – New Hope Coal Andre du Preez – New Hope Coal

B.Sc. M.Env.Mgt; 30 years B.Sc.Eng; 22 years

Executive Summary All Peter Smith – SKM B.Sc A.E.S; 20 years 1. Introduction All Peter Smith – SKM B.Sc A.E.S; 20 years 2. Project Justification

and Sustainability All Niall Carey – SKM B.Eng(Hons), MEnvMgt;13

years 3. Project Description All David Genn – New Hope Coal

Peter Smith – SKM B.Sc. M.Env.Mgt; 30 years B.Sc B.Sc A.E.S; 20 years

4. Land Resources Soil GeochemistryEIS Section

Peter Baker – PW Baker & AssocJeremy Wicks – SKM Katharine Brown – SKM

Graham Tuck – GT Environmental Services Peter Smith – SKM

B.Nat.Res. (Hons); 30 years B.Eng.Env; 10 years BAppSc, MSc (Soil Science), PhD (Soil Science) B.Sci.Env, Cert. Ag; 40 years

B.Sc A.E.S; 20 years

5. Surface Water Resources

All Fiona Stark – SKM B.Eng (Hons); 8 years

6. Groundwater Resources

All Jonathon Barlow – SKM

Derwin Lyons – SKM Brian Barnett – SKM

B.Sc. E.Sci, M.Sc. Ground Eng; 13 years B.Sci Hydro (Hons); 8 years B.Eng (civil); 34 years

7. Terrestrial Ecology All Hunter Brownscombe – SKM B.Sc Forstru, M.Env.Mgt; 15 years

8. Aquatic Ecology All Richard Hunt - SKM B.Sc.(Hons), Grad Dip Aq.Sc., PhD; 15 years

9. Air Quality All Niall Carey – SKM B.Eng(Hons), MEnvMgt;13 years

10. Greenhouse Gases and Climate Change

All Niall Carey – SKM B.Eng(Hons), MEnvMgt;13 years

11. Noise and Vibration All Jackson Yu – SKM B.Eng MEnvEng; 14 years

12. Cultural Heritage Supporting investigation

Converge Heritage + Community Peter Smith – SKM

N/A

B.Sc A.E.S; 20 years 13. Traffic and

Transport All Renukha Nadarajah – SKM BE.Civil (Hons); 7 years

14. Waste Management All Damien Taylor – SKM B.Sc.Env; 19 years 15. Visual Amentity All Will Rowles – SKM B.RegTownPlanning; 4 years

16. Social Environment All Jo Cawthera – SKM B.A. CommDev; 6 years 17. Economic All Hope Stevens – SKM B.S. BusEconomics; 6 years

Page 3: Appendix B Study Teameisdocs.dsdip.qld.gov.au/New Acland Coal Mine Stage 3/EIS...B.Sci.Env, Cert. Ag; 40 years B.Sc A.E.S; 20 years 5. Surface Water Resources All Fiona Stark – SKM

New Acland Coal Mine Stage 3 Project–Environmental Impact Statement PAGE 2

ChapNo.

Chapter Name StudyComponent

Team Member Name and Company

Qualifications and experience

Environment 18. Health, Safety &

Risk All Damien Taylor – SKM B.Sc.Env; 19 years

19. Community Consultation

All Sue Monk – SKM Jo Cawthera

B.A journ, MSc.; 16 years B.A. CommDev; 6 years

20. Cumulative Impacts All Niall Carey – SKM B.Eng(Hons), MEnvMgt;13 years

21. EM Plan All Peter Smith – SKM B.Sc A.E.S; 20 years 22. Conclusions and

Recommendations All Peter Smith – SKM B.Sc A.E.S; 20 years

Page 4: Appendix B Study Teameisdocs.dsdip.qld.gov.au/New Acland Coal Mine Stage 3/EIS...B.Sci.Env, Cert. Ag; 40 years B.Sc A.E.S; 20 years 5. Surface Water Resources All Fiona Stark – SKM

THIS PAGE IS INTENTIONALLY LEFT BLANK