Ku-ring-gai Council Planning Proposal
APPENDIX B – Council Report – 10th November 2015
.
Ordinary Meeting of Council - 10 November 2015 GB.11 / 356 Item GB.11 S10749 28 September 2015
20151110-OMC-Crs-2015/293203/356
GB.11 Lindfield Community Hub - planning proposal and site-specific DCP
LINDFIELD COMMUNITY HUB - PLANNING PROPOSAL AND SITE-SPECIFIC DCP
EXECUTIVE SUMMARY
PURPOSE OF REPORT: To update Council on the requirement to prepare a planning proposal to amend Ku-ring-gai LEP (Local Centres) 2012 (KLEP 2012) and to prepare a site-specific DCP to reflect the adopted preferred master plan option for the Lindfield Community Hub site.
BACKGROUND: At OMC of 6 October 2015, Council resolved the following:
That Council adopts a variation of Option 2, with a maximum building height of 7 (seven) storeys, for the purposes of an Expression of Interest (EOI), which excludes Scouts and Ausgrid land;
That Council advertises an EOI seeking proposals from development companies based on Option 2 (revised EOI version);
That Council adopts certain mandatory elements as part of the scope of works of the EOI; and
That Council adopt a program for the EOI process.
COMMENTS: In order to implement the adopted preferred master plan option for the Lindfield Hub site, a Planning Proposal is required to amend the zoning of the site to B2 Local Centres with a maximum building height of 26.5m and an FSR of 1.3:1. A site-specific DCP is to be prepared and a Traffic Management Plan adopted to facilitate development of the site.
RECOMMENDATION: That Council resolve to submit a planning proposal to amend KLEP 2012 to amend the zoning, building height and FSR of the site;
That Council resolve to prepare a site-specific DCP to reflect the adopted Preferred Master Plan Option for the site (revised EOI version);
That Council adopts in principle Option 1C of the Transport Management Plan for the Lindfield Local Centre.
Ordinary Meeting of Council - 10 November 2015 GB.11 / 357 Item GB.11 S10749 28 September 2015
20151110-OMC-Crs-2015/293203/357
PURPOSE OF REPORT
To update Council on the requirement to prepare a planning proposal to amend Ku-ring-gai LEP (Local Centres) 2012 (KLEP 2012) and to prepare a site-specific DCP to reflect the adopted preferred master plan option for the Lindfield Community Hub site.
BACKGROUND At OMC of 6 October 2015, GB.10, Lindfield Community Hub Update Report, Council resolved the following:
A. That Council adopts Option 2 (as exhibited) with a maximum building height of 7 (seven) storeys as the preferred option for the Lindfield Community Hub project;
B. That Council adopts a variation of Option 2, with a maximum building height of 7 (seven) storeys, for the purposes of an Expression of Interest (EOI), which excludes Scouts Association land located at 1A Beaconsfield Parade, Lindfield (Lot 2 of DP184154; Lot C of DP 399995; and Lot A of 327729) and AUSGRID land located at 1 Beaconsfield Parade, Lindfield (Lot 1 of DP184042);
C. That Council advertises an Expression of Interest (EOI) seeking proposals from
development companies based on option 2 (revised EOI version) as described in resolution B;
D. That in order to encourage innovation Council will accept non-conforming bids
from the EOI process on the condition that a fully conforming bid is submitted. Where a non-conforming bid is submitted the proposal must describe in detail all the benefits and costs; the financial impacts; and potential impacts on the project risk profile
E. That Council adopts the following community infrastructure elements as
mandatory requirements for any bid arising from EOI to be considered as conforming:
LINDFIELD COMMUNITY HUB – PROJECT SCOPE/MANDATORY ELEMENTS
Category of works
Items of inclusion Location and extent
Minimum requirements
Relevant guidelines and controls
General Mix of residential, retail and commercial uses
_ _ _
Streetscape works
-New footpaths -Underground power
lines -LED street lighting -Street trees and tree
grates -Landscaping of verges -Installation of street
furniture such as
Bent Lane Bent Street Woodford Lane Beaconsfield Parade
_ Ku-ring-gai Town Centres Public Domain Plan, 2010 Ku-ring-gai Contributions Plan, 2010 Council’s
Ordinary Meeting of Council - 10 November 2015 GB.11 / 358 Item GB.11 S10749 28 September 2015
20151110-OMC-Crs-2015/293203/358
LINDFIELD COMMUNITY HUB – PROJECT SCOPE/MANDATORY ELEMENTS
Category of works
Items of inclusion Location and extent
Minimum requirements
Relevant guidelines and controls
benches, litter bins and bike racks, on strategic locations
streetscape technical manual
Road and transport works
-Road realignment and resurfacing
-Kerb and gutter realignment
Bent Lane Woodford Lane
_ Ku-ring-gai Town Centres Public Domain Plan , 2010 Ku-ring-gai Contributions Plan, 2010 Lindfield Local Centre Transport Network Model Study Report 2013-14
-Construction of new public street (realignment and extension of Drovers Way)
-Formal closure of existing Drovers Way road reserve
Between Bent Street and Beaconsfield Parade
_ Ku-ring-gai Town Centres Public Domain Plan, 2010 Ku-ring-gai Contributions Plan, 2010 Lindfield Local Centre Transport Network Model Study Report 2013-14
-Construction of new kiss & ride zone
- Construction of taxi rank with shelters and signage
Woodford Lane _ Ku-ring-gai Contributions Plan, 2010
-Modifications to traffic signals
Intersection of Pacific Highway and Balfour Street/Havilah Road
_ Lindfield Local Centre Transport Network Model Study Report 2013-14
-Installation of new traffic signals
Intersection of Beaconsfield Parade and Pacific Highway
_ Lindfield Local Centre Transport Network Model Study Report 2013-14
Public Domain Works
-Construction of new public park
-Construction of new urban plaza
Fronting Bent Street
Minimum size of consolidated green open space 3,000m2
Ku-ring-gai Town Centres Public Domain Plan, 2010 Ku-ring-gai Contributions Plan, 2010 Design specifications as provided by Council
-Construction of new Within road Design
Ordinary Meeting of Council - 10 November 2015 GB.11 / 359 Item GB.11 S10749 28 September 2015
20151110-OMC-Crs-2015/293203/359
LINDFIELD COMMUNITY HUB – PROJECT SCOPE/MANDATORY ELEMENTS
Category of works
Items of inclusion Location and extent
Minimum requirements
Relevant guidelines and controls
pedestrian plaza on Bent Street
reserve between Bent Lane and Pacific Highway
specifications as provided by Council
Community building
-Construction of a community hub building comprising a café, new branch library, community centre and child care centre with roof garden
Corner of Bent Street and new street (realigned Drovers Way)
-Minimum size 2,950m2
-High design quality
- Iconic
Lindfield Community Facilities Study, Elton consulting, 2013 Design specifications as provided by Council
-Full internal fit-out of branch library (turn-key)
Level 1 of community hub building
Minimum size 1,250 m2
Lindfield Community Facilities Study, Elton consulting, 2013 Design specifications as provided by Council
-Full internal fit-out of community centre (turn-key)
Level 2 of community hub building
Minimum size 1,200 m2
Lindfield Community Facilities Study, Elton consulting, 2013 Design specifications as provided by Council
-Full internal fit-out of childcare centre (turn-key)
Level 3 of community hub building
Minimum size 500 m2 with external roof top garden area
Design specifications as provided by Council Council’s DCP
Car parking -Council car parking for community uses
Basement car park
Minimum of 55 spaces
Australian Standards and Building Code of Australia
-Public parking (Commuter)
Basement car park
Minimum of 140 spaces
Australian Standards and Building Code of Australia
-Council car parking (replacement of existing at-grade spaces)
Basement car park
Minimum of 112 spaces
Australian Standards and Building Code of Australia
-Private parking (retail and commercial)
Basement car park
_ Local Centres DCP, 2012 Lindfield Community Hub - Site specific DCP
-Private parking (residential)
Basement car park
_ Local Centres DCP, 2012 Lindfield Community Hub - Site specific DCP
Ordinary Meeting of Council - 10 November 2015 GB.11 / 360 Item GB.11 S10749 28 September 2015
20151110-OMC-Crs-2015/293203/360
LINDFIELD COMMUNITY HUB – PROJECT SCOPE/MANDATORY ELEMENTS
Category of works
Items of inclusion Location and extent
Minimum requirements
Relevant guidelines and controls
Retail & Commercial uses
-Supermarket -Commercial & Retail
(including supermarket)
Basement and ground level
Minimum supermarket size 3,000 m2 Maximum retail (including supermarket) + commercial floor space 5,000m2
Local Centres DCP, 2012 Lindfield Community Hub - Site specific DCP
F. That Council adopts the following general programme for the next phase of the
Lindfield Community Hub project: advertise EOI by end October 2015; EOI submissions close by December 2015; EOI evaluation period January 2016; selection of preferred development company by early 2016; negotiation with preferred development company completed by mid-2016;
and submission of development application by late 2016.
G. That Council writes to the Office of Local Government advising them of the Lindfield Community Hub project and noting that Council intends to submit a report that responds to the requirements of the Office of Local Government Capital Expenditure Guidelines, 2010;
H. That Council staff report back to Council at the Ordinary Meeting of Council (OMC) on 27 October 2015 regarding a planning proposal and a site-specific DCP in support of the preferred option; and
I. That Council staff report back to Council on the findings of the Lindfield Local
Centre Transport Network Model Study with a view to seeking concurrence from Roads and Maritime Services (RMS).
J. That all EOI submissions should wherever practicable incorporate the principles of
low energy-use design, sustainability and environmental sensitivity and describe how they will deliver sustainable outcomes consistent Ku-ring-gai Council policies.
The full list of Council reports which pertain to the Lindfield Hub project have been set out below for reference: 1. OMC – 26 June 2012 – GB.9 - Council Car Park – Woodford Lane, Lindfield – Reclassification 2. OMC – 26 February 2013 – GB.16 - Woodford Lane, Lindfield Commuter Car Park 3. OMC – 28 May 2013 – GB.10 - Lindfield Community Hub and Commuter Car Park – Next
Steps
Ordinary Meeting of Council - 10 November 2015 GB.11 / 361 Item GB.11 S10749 28 September 2015
20151110-OMC-Crs-2015/293203/361
4. OMC – 30 July 2013 – GB.5 – Proposed Reclassification of 1B Beaconsfield Parade and 19 Drovers Way, Lindfield (Woodford Lane Car Park) to Operational Land Following the Exhibition and Public Hearing Process
5. OMC – 12 November 2013 – C.1 - Potential Property Acquisition – Lindfield 6. OMC - 10 December 2013 - GB.19 - Lindfield Village Green - Tryon Road - Project Update 7. OMC – 24 June 2014 – C.1 - Property Acquisition - Lindfield 8. OMC – 9 September 2014 – GB.4 – Lindfield Community Hub – Woodford Lane – Report on
Progress 9. OMC - 11 November 2014 – GB.7 – Lindfield Community Hub – Probity Matters 10. OMC – 25 November 2014 – GB.8 – Lindfield Community Hub – Probity Management Plan 11. OMC – 9 December 2014 – Tender No. RFT22/2014 – Lindfield Community Hub – Tender For
Consultants to Prepare Illustrative Development Options and Master Plan 12. OMC – 21 April 2015 – GB.5 – Compulsory Acquisition of Roads – Lindfield 13. OMC – 8 September 2015 – GB.9 – Lindfield Community Hub Preferred Option 14. OMC – 6 October 2015 – GB 10 – Lindfield Community Hub Update Report COMMENTS 1. Site Description & Identification The site (as shown in map below) is currently a Council-owned car park, and is located west of the Pacific Highway, and is bound by Bent Street on the north, Beaconsfield Parade on the south, Woodford Lane on the east and residential properties on the west.
Figure 1: The Site
Ordinary Meeting of Council - 10 November 2015 GB.11 / 362 Item GB.11 S10749 28 September 2015
20151110-OMC-Crs-2015/293203/362
The legal description of the properties contained within the site is as per the table below: Property No
Land No Lot Number
Plan Type
Plan Number
Zoning
109520 46875 2 DP 1099330 B2 Local Centres 109520 46880 7 DP 1099330 B2 Local Centres 109520 46883 10 DP 1099330 B2 Local Centres 109520 46882 9 DP 1099330 B2 Local Centres 109520 46885 12 DP 1099330 B2 Local Centres 102951 2935 5 DP 666521 Part R4 High Density
Residential - RE1 Public Recreation- SP2 Local Road
141194 34989 A DP 445535 RE1 Public Recreation 102955 2939 10 DP 3498 RE1 Public Recreation 102956 46369 9 DP 1090427 RE1 Public Recreation 109520 46884 11 DP 1099330 B2 Local Centres 109520 46877 4 DP 1099330 B2 Local Centres 109520 46878 5 DP 1099330 B2 Local Centres 109520 46881 8 DP 1099330 B2 Local Centres 109520 46874 1 DP 1099330 B2 Local Centres 109520 46876 3 DP 1099330 B2 Local Centres 109520 46879 6 DP 1099330 B2 Local Centres 109520 46886 13 DP 1099330 B2 Local Centres 102953 2937 1 DP 724823 RE1 Public Recreation 102496 44207 1 DP 929131 B2 Local Centres 102952 2936 1 DP 980108 RE1 Public Recreation 109520 46887 14 DP 1099330 B2 Local Centres 109520 46889 16 DP 1099330 B2 Local Centres 109520 46888 15 DP 1099330 B2 Local Centres 102954 2938 3 DP 667420 RE1 Public Recreation
Table 1: Legal description of Properties within site area
2. Planning Context The Lindfield Community Hub site is currently zoned part B2 Local Centres, part R4 Residential High Density, part RE1 Public Recreation and part SP2 Local Road under the Ku-ring-gai LEP. See figure 3 below. The site is located in the Lindfield Local Centre. The Ku-ring-gai (Local Centres) DCP - Volume B guides the qualitative design response to the site, both in relation to the particular characteristics of Lindfield as a centre and the building typologies considered appropriate. The site is subject to the relevant requirements of the Ku-ring-gai (Local Centres) DCP contained in Volume A, Part 7 – Residential Flat Buildings and Part 8 – Mixed Use Development.
Ordinary Meeting of Council - 10 November 2015 GB.11 / 363 Item GB.11 S10749 28 September 2015
20151110-OMC-Crs-2015/293203/363
Figure 2: Current Zoning of the Lindfield Hub Site
3. Preferred Option 4 (four) illustrative master plan options were prepared and exhibited during the period between 21 March 2015 to 14 May 2015 during which the community and all key stakeholders were extensively consulted (refer details under Community Consultation in this report). Full details of these options can be viewed on Council’s website at: http://www.kmc.nsw.gov.au/Current_projects_priorities/Key_priorities/Activate_Lindfield/Lindfield_Community_Hub A preferred option ie Option 2 (revised EOI version), was adopted by Council at OMC 6 October 2015. The preferred option consists of a mix of residential, commercial, retail and open space uses, at a maximum height of seven (7) storeys (26.5m) and a Floor Space Ratio (FSR) of 1.3:1. The maximum building height of 26.5m has been calculated using higher floor to floor heights for the first two floors of the buildings in order to accommodate potential retail/commercial uses and for improved solar access to the lower floors, in line with SEPP65, and to accommodate service over-runs on the top floors. Please see images below which illustrate the preferred option. It is to be noted that the Ausgrid and Scouts properties on Beaconsfield Parade have been excluded from the revised Option 2 plans.
Ordinary Meeting of Council - 10 November 2015 GB.11 / 364 Item GB.11 S10749 28 September 2015
20151110-OMC-Crs-2015/293203/364
Figure 3: 3D View 1 of Preferred Option
Figure 4: 3D View 2 of Preferred Option
Ordinary Meeting of Council - 10 November 2015 GB.11 / 365 Item GB.11 S10749 28 September 2015
20151110-OMC-Crs-2015/293203/365
Figure 5: Illustrative Master Plan (Preferred Option)
4. Planning Proposal A Planning Proposal needs to be prepared to amend KLEP (Local Centres) 2012 to facilitate the development of the Lindfield Community Hub in accordance withthe adopted Preferred Master Plan Option (Option 2 - EOI version) for the site. Zoning Current: The Lindfield Community Hub site is currently zoned part B2 Local Centres, part RE1 Public Recreation, part SP2 Local road and part R4 High Density Residential under the KLEP 2012. The part of the site zoned R4 High Density Residential consist of a 490m2 (approx.) portion of 12 Bent Street that is not required for the extension Drovers Way. The remainder of 12 Bent Street is currently zoned SP2 local road with a small slither (<50m2) RE1 Public Recreation. The R4 zoned portion of this site is not specifically required for the implementation of the master plan and will be surplus to the development of the new road and the Lindfield Community Hub. This provides an opportunity for Council to subdivide off that portion of 12 Bent Street and to divest the land so as to make it available to be incorporated into the future redevelopment of the adjoining R4 zoned land at 14 and 16 Bent Street. The funds from this divestment would be put back into the Development Contributions (S94) funds for local road network improvements, which is currently in deficit. The land at 2-10 Bent Street and currently zoned RE1 Public Recreation was acquired by Council using section 94 Development contributions for the of local open space. The Community Hub
Ordinary Meeting of Council - 10 November 2015 GB.11 / 366 Item GB.11 S10749 28 September 2015
20151110-OMC-Crs-2015/293203/366
master plan makes provision for the equivalent amount of open space throughout the site while identifying a portion of the land previously acquired for open space for retail and community uses. The retail and community uses would not be permitted on that portion of the site zoned RE1. By rezoning the whole hub site to B2 Local centre, it will facilitate the implementation of the master plan across the entire site. Proposed: The entire site, excluding the R4 zoned portion of 12 Bent Street, be zoned to B2 Local Centres. Building Height Current: The maximum permissible height for that portion of the site zoned B2 Local Centre is currently 11.5m. That portion of the site zoned RE1 Public Recreation has not have an applicable height limit, while 12 Bent Street has a maximum height 17.5m. Proposed: The maximum height of buildings for the entire site, excluding the R4 zoned portion of 12 Bent Street, be amended to 26.5m. Floor Space Ratio (FSR) Current: The maximum permissible FSR for that portion of the site zoned B2 Local Centre is currently 1:1. That portion of the site zoned RE1 Public Recreation has not have an applicable FSR, while 12 Bent Street has a maximum FSR of 1.3. Proposed: The maximum FSR for the entire site be amended to 1.3:1. Land Reservations Current: The land at 2-10 Bent Street and currently identified on the Land Reservation Acquisition Map of the KLEP (Local Centres) 2012 as land reserved for Public Recreation, while 12 Bent Street is identified as land reserved for Local Road. As Council has now acquired these sites for the intended reserved purposes identified in the LEP there is no longer a requirement for the reservations to appear on the Land Reservation Acquisition Map. Proposed: The Land Reservation Acquisition Map be amended to delete the reservations applying to 2-10 Bent Street and 12 Bent Street. 5. Site-Specific DCP A site-specific DCP will be prepared for the site based on the preferred option for the site (revised EOI version). The site specific DCP provisions will take the form of an amendment to the Ku-ring-gai Local Centres DCP and will be incorporated into Volume B Part 1 of that DCP. This work is anticipated to be undertaken in early 2016.
6. Traffic Management Plan Consultants Peopletrans were engaged to assess the traffic and transport impacts of the master planning options for the Lindfield Community Hub site, in conjunction with future anticipated land use development of the wider Lindfield local centre. This study analysed the transport implications associated with the various land use options, and their full report can be viewed at Attachment A1: Lindfield Local Centre Transport Network Model Study by Peopletrans, 2013/14. The methodology for the study was as follows:
Ordinary Meeting of Council - 10 November 2015 GB.11 / 367 Item GB.11 S10749 28 September 2015
20151110-OMC-Crs-2015/293203/367
understand the land use & transport characteristics of the Ku-ring-gai & Lindfield
population; develop and audit a transport model for existing conditions; analyse the land use options for the site; determine the preferred land use & transport option through transport network testing;
and prepare a study report with conclusions & recommendations.
During the study, it was found that the potential introduction of a right turn into Beaconsfield Parade from Pacific Highway would have significant impacts on northbound Pacific Highway traffic flows and would cause excessive queues and delays during the PM peak period, and was not likely to be acceptable to Roads and Maritime Services. In summary, Traffic Management Option 1C (TMM1C) was determined to be the best transport management scheme to support the preferred land use option, as it offers the best operational road network performance. Key upgrades and new facilities as part of this scheme include:
modification of traffic signals at intersection Pacific Highway and Balfour Street/Havilah Road, by the extension of the right turn bay on Pacific Highway and turning movement restrictions from Balfour Street/Havilah Road;
new traffic signals at intersection Pacific Highway and Strickland Avenue, incorporating 2 right turn lanes onto Pacific Highway from Strickland Avenue and pedestrian facilities;
modification/relocation of pedestrian signals on Pacific Highway near Tryon Place (station entrance) to incorporate vehicular movements at intersection of Pacific Highway and Tryon Place;
new one-way link road from Pacific Highway (through Lindfield Library site) connecting to Tryon Place, incorporating commuter drop off and pick up;
new traffic signals at intersection Pacific Highway and Beaconsfield Parade, incorporating pedestrian facilities. No right turn from Pacific Highway into Beaconsfield Parade;
modification of Bent Lane and Woodford Lane to one-way southbound, incorporating commuter drop off and pick up in Woodford Lane;
pedestrianisation of Bent Street between Pacific Highway and Bent Lane; potential for pedestrian bridge over Pacific Highway adjacent to railway station entrance
(subject to funding and land requirements); relocation of pedestrian activated signals on Lindfield Avenue to the intersection of
Lindfield Avenue and Tryon Road; and pedestrianisation of Kochia Lane between Lindfield Avenue and Chapman Lane.
INTEGRATED PLANNING AND REPORTING Places, Spaces and Infrastructure - P4 Revitalisation of our centres Community, People and Culture - C4 Healthy lifestyles
Ordinary Meeting of Council - 10 November 2015 GB.11 / 368 Item GB.11 S10749 28 September 2015
20151110-OMC-Crs-2015/293203/368
Community Strategic Plan Long Term Objective
Delivery Program Term Achievement
Operational Plan Task
A range of well planned, clean and safe neighbourhoods and public spaces designed with a strong sense of identity and place.
P4.1.1 Plans to revitalise local centres are being progressively implemented and achieve quality design outcomes in collaboration with key agencies, landholders and the community. P4.1.4 An improvement plan for Lindfield centre is being progressively implemented in collaboration with owners, businesses and state agencies.
Implement a place management approach for the local centre improvements to coordinate works and achieve quality outcomes.
Engage with relevant stakeholders to establish timing, extent and partnership opportunities.
Undertake due diligence and undertake project scope.
Identify and engage with the key stakeholders.
A healthy, safe, and diverse community that respects our history, and celebrates our differences in a vibrant culture of learning.
C4.1.2 New and enhanced open space and recreational facilities have been delivered to increase community use and enjoyment.
Undertake acquisitions for new parks. Undertake assessment and identify locations for new parks Complete the design for identified parks and include design principles which facilitate passive recreation activities. Construct parks at identified locations and include design principles which facilitate passive recreation activities
GOVERNANCE MATTERS The following set of governance documents for the Lindfield Community Hub Project have been completed and reported to Council. These documents are intended to guide the day-to-day management of the project, including the EOI phase:
Governance Structure; Probity Management Framework; Probity Plan & Market Sounding Probity Protocol; and Project Decision Making Framework.
Ordinary Meeting of Council - 10 November 2015 GB.11 / 369 Item GB.11 S10749 28 September 2015
20151110-OMC-Crs-2015/293203/369
RISK MANAGEMENT 1. Amendment of Expression of Interest (EOI) Program The EOI release date, although originally planned and resolved to be in late October 2015, has been postponed to February 2016, for the following reasons:
1- further work required on the EOI document from a legal perspective; 2- lack of resources within Council to undertake the required volume of work required for the
EOI within the tight pre-Christmas 2015 timeframe; and 3- the need to provide ample time for Council to respond to the NSW Government’s planned
update in December with respect to the ‘Fit for Future’ proposals. The amended program for the project is as follows:
EOI release date late February 2016; EOI submissions closure April 2016; Selection of preferred EOI respondent by end June 2016; Completion of negotiation with preferred development company by end August 2016; Submission of development application by December 2016; Development approval by late 2017; and Commencement of construction by early 2018.
2. Risk Management Plan A Risk Management Plan for the Lindfield Community Hub Project was adopted by Council on 8 September 2015. A project-specific Risk Management Matrix is currently being prepared in conjunction with Council’s risk officer. The details of this Plan will be reported to Council once finalised. 3. Due Diligence Checks A comprehensive due diligence checklist has been prepared and staff are currently seeking information pertaining to the site. The list of items includes an updated topographic survey, geotechnical survey, environmental assessments (contamination) and an arboricultural assessment. FINANCIAL CONSIDERATIONS A total of $851,000.00 has been spent during the financial years 2013/14 and 2014/15 on this project. It is noted that this represents a considerable amount of expenditure on staff salaries and consultants, although not uncommon for a project of this value of approximately $120M. The funding sources have been from development contributions including the 2010 Plan as well as earlier Plans. During this time the work undertaken has included project scoping, preliminary project feasibility, master plan options, exhibition, community engagement and assessment of options. A possible result of any failure to progress the project could mean that Council will be required to repay the S94 funds spent to date because the community infrastructure will not be delivered.
Ordinary Meeting of Council - 10 November 2015 GB.11 / 370 Item GB.11 S10749 28 September 2015
20151110-OMC-Crs-2015/293203/370
Approximately $14 million in funds (2014/2015 dollars) have been allocated to this project in Council’s Long Term Financial Plan (LTFP). This represents Council’s contribution to the costs of streetscape works, road and transport works, public domain, community buildings and car parking identified in the project scope earlier in this report. Council’s LTFP also includes financial contributions from ‘development partners’ where Council is unable to fund certain facilities such as community buildings and car parking due to apportionment rates within the development contributions plan or a lack of nexus. The funds are identified as expenditure for the years 2017 through to 2021. In order for Council to spend these funds in a timely manner, it will be necessary to meet the EOI programme as outlined earlier in this report. SOCIAL CONSIDERATIONS Council, as part of the Delivery Program 2013-2017 and Operational Plan 2013-2014, seeks to revitalise the Lindfield local centre to improve the vitality and liveability. The key objective of the project is to create a vibrant community hub for Lindfield incorporating a new branch library and community centre, town centre park, commuter and community parking with other uses such as retail and residential spaces. Council envisages this to be a rare opportunity to create a precinct which will be a valuable asset to the residents of Lindfield and the wider Ku-ring-gai community to gather in a quality urban environment. The provision of additional community infrastructure providing both outdoor and indoor community spaces will continue to support this process and help Ku-ring-gai continue to be a vibrant and popular place to live for all ages. ENVIRONMENTAL CONSIDERATIONS The proposed planning proposal will not change the existing biodiversity provisions or mapping identified in the Ku-ring-gai (Local Centres) LEP, 2012. COMMUNITY CONSULTATION 1. Stakeholder Consultation
1.1 Transport for NSW (TfNSW) In May 2012 the NSW Government announced by media release it will build a new commuter car park comprising 240 new spaces in Lindfield. Since that time, and in accordance with Council resolutions, staff have worked in close liaison with representatives from TfNSW to resolve the location and number of commuter car parking in Lindfield through the two Lindfield projects – the Village Green and the Community Hub.
Given the stage of planning for the two projects TfNSW has suggested that Council submit a formal proposal to the Assistant Deputy Secretary - Planning Division of Transport for NSW for the Minister’s approval as the basis for commencing negotiations and completing an agreement between the parties for the delivery of 240 commuter car spaces in Lindfield local centre. The proposal will cover two key aspects: the proposed location or spatial arrangement of the commuter car parking; and the estimated cost of the car parking.
Ordinary Meeting of Council - 10 November 2015 GB.11 / 371 Item GB.11 S10749 28 September 2015
20151110-OMC-Crs-2015/293203/371
A proposal is currently under preparation and will be reported to Council in the near future. It is to be noted that both projects can proceed with or without commuter parking. If commuter parking is included, this will be at no additional cost to Council.
COMMUNITY CONSULTATION Council started engaging with the local community on the opportunities and vision for the Lindfield Community Hub in early 2014 by creating the ‘Activate Lindfield’ initiative. Since that time, 692 residents, business owners and other interested stakeholders have signed-up to the Activate Lindfield e-newsletter. The public exhibition for the project spanned a period of eight (8) weeks, from Saturday, 21 March to Friday, 8 May 2015 with a further extension to Thursday, 14 May 2015. During this time, the community was invited to provide feedback on the four (4) master plan options. Details of the community engagement undertaken to date have been outlined in the 6 October 2015 Council report. If the planning proposal is adopted it will proceed to a gateway determination. This will also involve a formal statutory exhibition period, with a call for submissions and a further report back to Council. INTERNAL CONSULTATION Internal consultation for this project is prescribed by the Governance Structure (decision-making framework/hierarchy) for the project which is as follows:
Councillors; Executive Steering Committee (GMD); Project Sponsor - Director Strategy and Environment; Project Manager - Team Leader Urban Design; Project Control Group (PCG) (meetings are currently held bi-monthly); Project Working Group (PWG); and Tender Review Committee (various).
SUMMARY In order to implement the preferred option (Option 2 - revised EOI version) for the Lindfield Hub site, it is necessary to proceed with the amendment of the Ku-ring-gai LEP (Local Centres) 2012. This includes amendments to the land zoning, height of buildings, Floor Space Ratio and Land Reservation Acquisition maps. A site-specific DCP that reflects the adopted preferred master plan (Option 2 - revised EOI version) is also required. The site specific DCP provisions would to take the form of an amendment to the Ku-ring-gai Local Centres DCP and to be incorporated into Volume B Part 1 of that DCP. A portion of the land at 12 Bent Street, currently zoned R4 High Density Residential, is surplus to the development of the new road and the Lindfield Community Hub site and provides an opportunity for future divestment by Council.
Ordinary Meeting of Council - 10 November 2015 GB.11 / 372 Item GB.11 S10749 28 September 2015
20151110-OMC-Crs-2015/293203/372
It is also necessary to adopt a Traffic Management Plan (Option 1C as discussed in this report) which will ensure that appropriate road and traffic improvements are made in the local area to facilitate the proposed development of the site. In order to allow for ample time to render the EOI document legally watertight and adequately reviewed, it is in Council’s best interest to alter the EOI release date from late October 2015 to February 2016, and to alter the overall EOI programme. Recommendation
RECOMMENDATION:
A. That a Planning Proposal be prepared, in accordance with section 55 of the Environmental Planning and Assessment Act, 1979, to amend the Ku-ring-gai LEP (Local Centres)2012 as it applies to the Lindfield Community Hub site as follows:
i. Rezone the site, excluding the R4 zoned portion of 12 Bent Street, from part
Zone B2 Local Centres, part Zone RE1 Public Recreation and part Zone SP2 Local Road to Zone B2 Local Centre;
ii. Amend the Height of Buildings Map to increase the maximum height of buildings for the site, excluding the R4 zoned portion of 12 Bent Street, from 11.5 metres to 26.5 metres;
iii. Amend the Floor Space Ratio map to increase the maximum FSR for the site from 1:1 to 1.3:1
iv. Amend the Land Reservation Acquisition Map to delete the reservation for Public Recreation applying to the land at 2-10 Bent Street and reservation for Local Road applying to land at 12 Bent Street, Lindfield.
B. That the Planning Proposal be submitted to the Department of Planning and
Environment for a Gateway Determination in accordance with Section 56 of the Environmental Planning and Assessment Act, 1979.
C. That upon receipt of a Gateway Determination, the exhibition and consultation process is carried out in accordance with the requirements of the Environmental Planning and Assessment Act, 1979 and with the Gateway Determination requirements
D. That a report be brought back to Council at the end of the exhibition processes.
E. That a site-specific DCP be prepared for the site in accordance with the adopted preferred master plan (Option 2 - revised EOI version). The site specific DCP provisions are to take the form of an amendment to the Ku-ring-gai Local Centres DCP and to be incorporated into Volume B Part 1 of that DCP.
F. That Council authorises the General Manager and/or his delegate to commence the
process to subdivide the lot at 12 Bent Street Lindfield to excise that part of the lot zoned R4 High Density Residential with the view for future divestment.
G. That Council resolve to amend the EOI program as follows:
- EOI release date late February 2016; - EOI submissions closure April 2016;
Ordinary Meeting of Council - 10 November 2015 GB.11 / 373 Item GB.11 S10749 28 September 2015
20151110-OMC-Crs-2015/293203/373
- Selection of preferred EOI respondent by end June 2016; - Completion of negotiation with preferred development company by end August
2016; - Submission of development application by December 2016; - Development approval by late 2017; and - Commencement of construction by early 2018.
H. That Council adopt in principle the Traffic Management Option 1C of the Lindfield
Local Centre Transport Network Model Study 2013/14 and submit it to Roads and Maritime Services for concurrence.
Bill Royal Team Leader Urban Design
Sarah Koshy Senior Urban Designer
Craige Wyse Team Leader Urban Planning
Antony Fabbro Manager Urban & Heritage Planning
Andrew Watson Director Strategy & Environment
Attachments: A1 Lindfield Community Hub Traffic Management Plan by PeopleTrans 2015/284655
APPENDIX NO: 1 - LINDFIELD COMMUNITY HUB TRAFFIC MANAGEMENT PLAN BY PEOPLETRANS
ITEM NO: GB.11
20151110-OMC-Crs-2015/293203/374
APPENDIX NO: 1 - LINDFIELD COMMUNITY HUB TRAFFIC MANAGEMENT PLAN BY PEOPLETRANS
ITEM NO: GB.11
20151110-OMC-Crs-2015/293203/375
APPENDIX NO: 1 - LINDFIELD COMMUNITY HUB TRAFFIC MANAGEMENT PLAN BY PEOPLETRANS
ITEM NO: GB.11
20151110-OMC-Crs-2015/293203/376
APPENDIX NO: 1 - LINDFIELD COMMUNITY HUB TRAFFIC MANAGEMENT PLAN BY PEOPLETRANS
ITEM NO: GB.11
20151110-OMC-Crs-2015/293203/377
APPENDIX NO: 1 - LINDFIELD COMMUNITY HUB TRAFFIC MANAGEMENT PLAN BY PEOPLETRANS
ITEM NO: GB.11
20151110-OMC-Crs-2015/293203/378
APPENDIX NO: 1 - LINDFIELD COMMUNITY HUB TRAFFIC MANAGEMENT PLAN BY PEOPLETRANS
ITEM NO: GB.11
20151110-OMC-Crs-2015/293203/379
APPENDIX NO: 1 - LINDFIELD COMMUNITY HUB TRAFFIC MANAGEMENT PLAN BY PEOPLETRANS
ITEM NO: GB.11
20151110-OMC-Crs-2015/293203/380
APPENDIX NO: 1 - LINDFIELD COMMUNITY HUB TRAFFIC MANAGEMENT PLAN BY PEOPLETRANS
ITEM NO: GB.11
20151110-OMC-Crs-2015/293203/381
APPENDIX NO: 1 - LINDFIELD COMMUNITY HUB TRAFFIC MANAGEMENT PLAN BY PEOPLETRANS
ITEM NO: GB.11
20151110-OMC-Crs-2015/293203/382
APPENDIX NO: 1 - LINDFIELD COMMUNITY HUB TRAFFIC MANAGEMENT PLAN BY PEOPLETRANS
ITEM NO: GB.11
20151110-OMC-Crs-2015/293203/383
APPENDIX NO: 1 - LINDFIELD COMMUNITY HUB TRAFFIC MANAGEMENT PLAN BY PEOPLETRANS
ITEM NO: GB.11
20151110-OMC-Crs-2015/293203/384
APPENDIX NO: 1 - LINDFIELD COMMUNITY HUB TRAFFIC MANAGEMENT PLAN BY PEOPLETRANS
ITEM NO: GB.11
20151110-OMC-Crs-2015/293203/385
APPENDIX NO: 1 - LINDFIELD COMMUNITY HUB TRAFFIC MANAGEMENT PLAN BY PEOPLETRANS
ITEM NO: GB.11
20151110-OMC-Crs-2015/293203/386
APPENDIX NO: 1 - LINDFIELD COMMUNITY HUB TRAFFIC MANAGEMENT PLAN BY PEOPLETRANS
ITEM NO: GB.11
20151110-OMC-Crs-2015/293203/387
APPENDIX NO: 1 - LINDFIELD COMMUNITY HUB TRAFFIC MANAGEMENT PLAN BY PEOPLETRANS
ITEM NO: GB.11
20151110-OMC-Crs-2015/293203/388
APPENDIX NO: 1 - LINDFIELD COMMUNITY HUB TRAFFIC MANAGEMENT PLAN BY PEOPLETRANS
ITEM NO: GB.11
20151110-OMC-Crs-2015/293203/389
APPENDIX NO: 1 - LINDFIELD COMMUNITY HUB TRAFFIC MANAGEMENT PLAN BY PEOPLETRANS
ITEM NO: GB.11
20151110-OMC-Crs-2015/293203/390
APPENDIX NO: 1 - LINDFIELD COMMUNITY HUB TRAFFIC MANAGEMENT PLAN BY PEOPLETRANS
ITEM NO: GB.11
20151110-OMC-Crs-2015/293203/391
APPENDIX NO: 1 - LINDFIELD COMMUNITY HUB TRAFFIC MANAGEMENT PLAN BY PEOPLETRANS
ITEM NO: GB.11
20151110-OMC-Crs-2015/293203/392
APPENDIX NO: 1 - LINDFIELD COMMUNITY HUB TRAFFIC MANAGEMENT PLAN BY PEOPLETRANS
ITEM NO: GB.11
20151110-OMC-Crs-2015/293203/393
APPENDIX NO: 1 - LINDFIELD COMMUNITY HUB TRAFFIC MANAGEMENT PLAN BY PEOPLETRANS
ITEM NO: GB.11
20151110-OMC-Crs-2015/293203/394
APPENDIX NO: 1 - LINDFIELD COMMUNITY HUB TRAFFIC MANAGEMENT PLAN BY PEOPLETRANS
ITEM NO: GB.11
20151110-OMC-Crs-2015/293203/395
APPENDIX NO: 1 - LINDFIELD COMMUNITY HUB TRAFFIC MANAGEMENT PLAN BY PEOPLETRANS
ITEM NO: GB.11
20151110-OMC-Crs-2015/293203/396
APPENDIX NO: 1 - LINDFIELD COMMUNITY HUB TRAFFIC MANAGEMENT PLAN BY PEOPLETRANS
ITEM NO: GB.11
20151110-OMC-Crs-2015/293203/397
APPENDIX NO: 1 - LINDFIELD COMMUNITY HUB TRAFFIC MANAGEMENT PLAN BY PEOPLETRANS
ITEM NO: GB.11
20151110-OMC-Crs-2015/293203/398
APPENDIX NO: 1 - LINDFIELD COMMUNITY HUB TRAFFIC MANAGEMENT PLAN BY PEOPLETRANS
ITEM NO: GB.11
20151110-OMC-Crs-2015/293203/399
APPENDIX NO: 1 - LINDFIELD COMMUNITY HUB TRAFFIC MANAGEMENT PLAN BY PEOPLETRANS
ITEM NO: GB.11
20151110-OMC-Crs-2015/293203/400
APPENDIX NO: 1 - LINDFIELD COMMUNITY HUB TRAFFIC MANAGEMENT PLAN BY PEOPLETRANS
ITEM NO: GB.11
20151110-OMC-Crs-2015/293203/401
APPENDIX NO: 1 - LINDFIELD COMMUNITY HUB TRAFFIC MANAGEMENT PLAN BY PEOPLETRANS
ITEM NO: GB.11
20151110-OMC-Crs-2015/293203/402
APPENDIX NO: 1 - LINDFIELD COMMUNITY HUB TRAFFIC MANAGEMENT PLAN BY PEOPLETRANS
ITEM NO: GB.11
20151110-OMC-Crs-2015/293203/403
APPENDIX NO: 1 - LINDFIELD COMMUNITY HUB TRAFFIC MANAGEMENT PLAN BY PEOPLETRANS
ITEM NO: GB.11
20151110-OMC-Crs-2015/293203/404
APPENDIX NO: 1 - LINDFIELD COMMUNITY HUB TRAFFIC MANAGEMENT PLAN BY PEOPLETRANS
ITEM NO: GB.11
20151110-OMC-Crs-2015/293203/405
APPENDIX NO: 1 - LINDFIELD COMMUNITY HUB TRAFFIC MANAGEMENT PLAN BY PEOPLETRANS
ITEM NO: GB.11
20151110-OMC-Crs-2015/293203/406
APPENDIX NO: 1 - LINDFIELD COMMUNITY HUB TRAFFIC MANAGEMENT PLAN BY PEOPLETRANS
ITEM NO: GB.11
20151110-OMC-Crs-2015/293203/407
APPENDIX NO: 1 - LINDFIELD COMMUNITY HUB TRAFFIC MANAGEMENT PLAN BY PEOPLETRANS
ITEM NO: GB.11
20151110-OMC-Crs-2015/293203/408
APPENDIX NO: 1 - LINDFIELD COMMUNITY HUB TRAFFIC MANAGEMENT PLAN BY PEOPLETRANS
ITEM NO: GB.11
20151110-OMC-Crs-2015/293203/409
APPENDIX NO: 1 - LINDFIELD COMMUNITY HUB TRAFFIC MANAGEMENT PLAN BY PEOPLETRANS
ITEM NO: GB.11
20151110-OMC-Crs-2015/293203/410
APPENDIX NO: 1 - LINDFIELD COMMUNITY HUB TRAFFIC MANAGEMENT PLAN BY PEOPLETRANS
ITEM NO: GB.11
20151110-OMC-Crs-2015/293203/411
APPENDIX NO: 1 - LINDFIELD COMMUNITY HUB TRAFFIC MANAGEMENT PLAN BY PEOPLETRANS
ITEM NO: GB.11
20151110-OMC-Crs-2015/293203/412
APPENDIX NO: 1 - LINDFIELD COMMUNITY HUB TRAFFIC MANAGEMENT PLAN BY PEOPLETRANS
ITEM NO: GB.11
20151110-OMC-Crs-2015/293203/413
APPENDIX NO: 1 - LINDFIELD COMMUNITY HUB TRAFFIC MANAGEMENT PLAN BY PEOPLETRANS
ITEM NO: GB.11
20151110-OMC-Crs-2015/293203/414
APPENDIX NO: 1 - LINDFIELD COMMUNITY HUB TRAFFIC MANAGEMENT PLAN BY PEOPLETRANS
ITEM NO: GB.11
20151110-OMC-Crs-2015/293203/415
APPENDIX NO: 1 - LINDFIELD COMMUNITY HUB TRAFFIC MANAGEMENT PLAN BY PEOPLETRANS
ITEM NO: GB.11
20151110-OMC-Crs-2015/293203/416
APPENDIX NO: 1 - LINDFIELD COMMUNITY HUB TRAFFIC MANAGEMENT PLAN BY PEOPLETRANS
ITEM NO: GB.11
20151110-OMC-Crs-2015/293203/417
APPENDIX NO: 1 - LINDFIELD COMMUNITY HUB TRAFFIC MANAGEMENT PLAN BY PEOPLETRANS
ITEM NO: GB.11
20151110-OMC-Crs-2015/293203/418
APPENDIX NO: 1 - LINDFIELD COMMUNITY HUB TRAFFIC MANAGEMENT PLAN BY PEOPLETRANS
ITEM NO: GB.11
20151110-OMC-Crs-2015/293203/419
APPENDIX NO: 1 - LINDFIELD COMMUNITY HUB TRAFFIC MANAGEMENT PLAN BY PEOPLETRANS
ITEM NO: GB.11
20151110-OMC-Crs-2015/293203/420
APPENDIX NO: 1 - LINDFIELD COMMUNITY HUB TRAFFIC MANAGEMENT PLAN BY PEOPLETRANS
ITEM NO: GB.11
20151110-OMC-Crs-2015/293203/421
APPENDIX NO: 1 - LINDFIELD COMMUNITY HUB TRAFFIC MANAGEMENT PLAN BY PEOPLETRANS
ITEM NO: GB.11
20151110-OMC-Crs-2015/293203/422
APPENDIX NO: 1 - LINDFIELD COMMUNITY HUB TRAFFIC MANAGEMENT PLAN BY PEOPLETRANS
ITEM NO: GB.11
20151110-OMC-Crs-2015/293203/423
APPENDIX NO: 1 - LINDFIELD COMMUNITY HUB TRAFFIC MANAGEMENT PLAN BY PEOPLETRANS
ITEM NO: GB.11
20151110-OMC-Crs-2015/293203/424
APPENDIX NO: 1 - LINDFIELD COMMUNITY HUB TRAFFIC MANAGEMENT PLAN BY PEOPLETRANS
ITEM NO: GB.11
20151110-OMC-Crs-2015/293203/425
APPENDIX NO: 1 - LINDFIELD COMMUNITY HUB TRAFFIC MANAGEMENT PLAN BY PEOPLETRANS
ITEM NO: GB.11
20151110-OMC-Crs-2015/293203/426
APPENDIX NO: 1 - LINDFIELD COMMUNITY HUB TRAFFIC MANAGEMENT PLAN BY PEOPLETRANS
ITEM NO: GB.11
20151110-OMC-Crs-2015/293203/427
APPENDIX NO: 1 - LINDFIELD COMMUNITY HUB TRAFFIC MANAGEMENT PLAN BY PEOPLETRANS
ITEM NO: GB.11
20151110-OMC-Crs-2015/293203/428
APPENDIX NO: 1 - LINDFIELD COMMUNITY HUB TRAFFIC MANAGEMENT PLAN BY PEOPLETRANS
ITEM NO: GB.11
20151110-OMC-Crs-2015/293203/429
APPENDIX NO: 1 - LINDFIELD COMMUNITY HUB TRAFFIC MANAGEMENT PLAN BY PEOPLETRANS
ITEM NO: GB.11
20151110-OMC-Crs-2015/293203/430
APPENDIX NO: 1 - LINDFIELD COMMUNITY HUB TRAFFIC MANAGEMENT PLAN BY PEOPLETRANS
ITEM NO: GB.11
20151110-OMC-Crs-2015/293203/431
APPENDIX NO: 1 - LINDFIELD COMMUNITY HUB TRAFFIC MANAGEMENT PLAN BY PEOPLETRANS
ITEM NO: GB.11
20151110-OMC-Crs-2015/293203/432
APPENDIX NO: 1 - LINDFIELD COMMUNITY HUB TRAFFIC MANAGEMENT PLAN BY PEOPLETRANS
ITEM NO: GB.11
20151110-OMC-Crs-2015/293203/433
APPENDIX NO: 1 - LINDFIELD COMMUNITY HUB TRAFFIC MANAGEMENT PLAN BY PEOPLETRANS
ITEM NO: GB.11
20151110-OMC-Crs-2015/293203/434
APPENDIX NO: 1 - LINDFIELD COMMUNITY HUB TRAFFIC MANAGEMENT PLAN BY PEOPLETRANS
ITEM NO: GB.11
20151110-OMC-Crs-2015/293203/435
APPENDIX NO: 1 - LINDFIELD COMMUNITY HUB TRAFFIC MANAGEMENT PLAN BY PEOPLETRANS
ITEM NO: GB.11
20151110-OMC-Crs-2015/293203/436
APPENDIX NO: 1 - LINDFIELD COMMUNITY HUB TRAFFIC MANAGEMENT PLAN BY PEOPLETRANS
ITEM NO: GB.11
20151110-OMC-Crs-2015/293203/437
APPENDIX NO: 1 - LINDFIELD COMMUNITY HUB TRAFFIC MANAGEMENT PLAN BY PEOPLETRANS
ITEM NO: GB.11
20151110-OMC-Crs-2015/293203/438
APPENDIX NO: 1 - LINDFIELD COMMUNITY HUB TRAFFIC MANAGEMENT PLAN BY PEOPLETRANS
ITEM NO: GB.11
20151110-OMC-Crs-2015/293203/439
APPENDIX NO: 1 - LINDFIELD COMMUNITY HUB TRAFFIC MANAGEMENT PLAN BY PEOPLETRANS
ITEM NO: GB.11
20151110-OMC-Crs-2015/293203/440
APPENDIX NO: 1 - LINDFIELD COMMUNITY HUB TRAFFIC MANAGEMENT PLAN BY PEOPLETRANS
ITEM NO: GB.11
20151110-OMC-Crs-2015/293203/441
APPENDIX NO: 1 - LINDFIELD COMMUNITY HUB TRAFFIC MANAGEMENT PLAN BY PEOPLETRANS
ITEM NO: GB.11
20151110-OMC-Crs-2015/293203/442
APPENDIX NO: 1 - LINDFIELD COMMUNITY HUB TRAFFIC MANAGEMENT PLAN BY PEOPLETRANS
ITEM NO: GB.11
20151110-OMC-Crs-2015/293203/443
APPENDIX NO: 1 - LINDFIELD COMMUNITY HUB TRAFFIC MANAGEMENT PLAN BY PEOPLETRANS
ITEM NO: GB.11
20151110-OMC-Crs-2015/293203/444
APPENDIX NO: 1 - LINDFIELD COMMUNITY HUB TRAFFIC MANAGEMENT PLAN BY PEOPLETRANS
ITEM NO: GB.11
20151110-OMC-Crs-2015/293203/445
APPENDIX NO: 1 - LINDFIELD COMMUNITY HUB TRAFFIC MANAGEMENT PLAN BY PEOPLETRANS
ITEM NO: GB.11
20151110-OMC-Crs-2015/293203/446
APPENDIX NO: 1 - LINDFIELD COMMUNITY HUB TRAFFIC MANAGEMENT PLAN BY PEOPLETRANS
ITEM NO: GB.11
20151110-OMC-Crs-2015/293203/447
APPENDIX NO: 1 - LINDFIELD COMMUNITY HUB TRAFFIC MANAGEMENT PLAN BY PEOPLETRANS
ITEM NO: GB.11
20151110-OMC-Crs-2015/293203/448
APPENDIX NO: 1 - LINDFIELD COMMUNITY HUB TRAFFIC MANAGEMENT PLAN BY PEOPLETRANS
ITEM NO: GB.11
20151110-OMC-Crs-2015/293203/449
APPENDIX NO: 1 - LINDFIELD COMMUNITY HUB TRAFFIC MANAGEMENT PLAN BY PEOPLETRANS
ITEM NO: GB.11
20151110-OMC-Crs-2015/293203/450
APPENDIX NO: 1 - LINDFIELD COMMUNITY HUB TRAFFIC MANAGEMENT PLAN BY PEOPLETRANS
ITEM NO: GB.11
20151110-OMC-Crs-2015/293203/451
APPENDIX NO: 1 - LINDFIELD COMMUNITY HUB TRAFFIC MANAGEMENT PLAN BY PEOPLETRANS
ITEM NO: GB.11
20151110-OMC-Crs-2015/293203/452
APPENDIX NO: 1 - LINDFIELD COMMUNITY HUB TRAFFIC MANAGEMENT PLAN BY PEOPLETRANS
ITEM NO: GB.11
20151110-OMC-Crs-2015/293203/453
APPENDIX NO: 1 - LINDFIELD COMMUNITY HUB TRAFFIC MANAGEMENT PLAN BY PEOPLETRANS
ITEM NO: GB.11
20151110-OMC-Crs-2015/293203/454
APPENDIX NO: 1 - LINDFIELD COMMUNITY HUB TRAFFIC MANAGEMENT PLAN BY PEOPLETRANS
ITEM NO: GB.11
20151110-OMC-Crs-2015/293203/455
APPENDIX NO: 1 - LINDFIELD COMMUNITY HUB TRAFFIC MANAGEMENT PLAN BY PEOPLETRANS
ITEM NO: GB.11
20151110-OMC-Crs-2015/293203/456
APPENDIX NO: 1 - LINDFIELD COMMUNITY HUB TRAFFIC MANAGEMENT PLAN BY PEOPLETRANS
ITEM NO: GB.11
20151110-OMC-Crs-2015/293203/457
APPENDIX NO: 1 - LINDFIELD COMMUNITY HUB TRAFFIC MANAGEMENT PLAN BY PEOPLETRANS
ITEM NO: GB.11
20151110-OMC-Crs-2015/293203/458
APPENDIX NO: 1 - LINDFIELD COMMUNITY HUB TRAFFIC MANAGEMENT PLAN BY PEOPLETRANS
ITEM NO: GB.11
20151110-OMC-Crs-2015/293203/459
APPENDIX NO: 1 - LINDFIELD COMMUNITY HUB TRAFFIC MANAGEMENT PLAN BY PEOPLETRANS
ITEM NO: GB.11
20151110-OMC-Crs-2015/293203/460
APPENDIX NO: 1 - LINDFIELD COMMUNITY HUB TRAFFIC MANAGEMENT PLAN BY PEOPLETRANS
ITEM NO: GB.11
20151110-OMC-Crs-2015/293203/461
APPENDIX NO: 1 - LINDFIELD COMMUNITY HUB TRAFFIC MANAGEMENT PLAN BY PEOPLETRANS
ITEM NO: GB.11
20151110-OMC-Crs-2015/293203/462
APPENDIX NO: 1 - LINDFIELD COMMUNITY HUB TRAFFIC MANAGEMENT PLAN BY PEOPLETRANS
ITEM NO: GB.11
20151110-OMC-Crs-2015/293203/463
APPENDIX NO: 1 - LINDFIELD COMMUNITY HUB TRAFFIC MANAGEMENT PLAN BY PEOPLETRANS
ITEM NO: GB.11
20151110-OMC-Crs-2015/293203/464
APPENDIX NO: 1 - LINDFIELD COMMUNITY HUB TRAFFIC MANAGEMENT PLAN BY PEOPLETRANS
ITEM NO: GB.11
20151110-OMC-Crs-2015/293203/465
APPENDIX NO: 1 - LINDFIELD COMMUNITY HUB TRAFFIC MANAGEMENT PLAN BY PEOPLETRANS
ITEM NO: GB.11
20151110-OMC-Crs-2015/293203/466
APPENDIX NO: 1 - LINDFIELD COMMUNITY HUB TRAFFIC MANAGEMENT PLAN BY PEOPLETRANS
ITEM NO: GB.11
20151110-OMC-Crs-2015/293203/467
APPENDIX NO: 1 - LINDFIELD COMMUNITY HUB TRAFFIC MANAGEMENT PLAN BY PEOPLETRANS
ITEM NO: GB.11
20151110-OMC-Crs-2015/293203/468
APPENDIX NO: 1 - LINDFIELD COMMUNITY HUB TRAFFIC MANAGEMENT PLAN BY PEOPLETRANS
ITEM NO: GB.11
20151110-OMC-Crs-2015/293203/469
APPENDIX NO: 1 - LINDFIELD COMMUNITY HUB TRAFFIC MANAGEMENT PLAN BY PEOPLETRANS
ITEM NO: GB.11
20151110-OMC-Crs-2015/293203/470
APPENDIX NO: 1 - LINDFIELD COMMUNITY HUB TRAFFIC MANAGEMENT PLAN BY PEOPLETRANS
ITEM NO: GB.11
20151110-OMC-Crs-2015/293203/471
APPENDIX NO: 1 - LINDFIELD COMMUNITY HUB TRAFFIC MANAGEMENT PLAN BY PEOPLETRANS
ITEM NO: GB.11
20151110-OMC-Crs-2015/293203/472
APPENDIX NO: 1 - LINDFIELD COMMUNITY HUB TRAFFIC MANAGEMENT PLAN BY PEOPLETRANS
ITEM NO: GB.11
20151110-OMC-Crs-2015/293203/473
APPENDIX NO: 1 - LINDFIELD COMMUNITY HUB TRAFFIC MANAGEMENT PLAN BY PEOPLETRANS
ITEM NO: GB.11
20151110-OMC-Crs-2015/293203/474
APPENDIX NO: 1 - LINDFIELD COMMUNITY HUB TRAFFIC MANAGEMENT PLAN BY PEOPLETRANS
ITEM NO: GB.11
20151110-OMC-Crs-2015/293203/475
APPENDIX NO: 1 - LINDFIELD COMMUNITY HUB TRAFFIC MANAGEMENT PLAN BY PEOPLETRANS
ITEM NO: GB.11
20151110-OMC-Crs-2015/293203/476
APPENDIX NO: 1 - LINDFIELD COMMUNITY HUB TRAFFIC MANAGEMENT PLAN BY PEOPLETRANS
ITEM NO: GB.11
20151110-OMC-Crs-2015/293203/477
APPENDIX NO: 1 - LINDFIELD COMMUNITY HUB TRAFFIC MANAGEMENT PLAN BY PEOPLETRANS
ITEM NO: GB.11
20151110-OMC-Crs-2015/293203/478
APPENDIX NO: 1 - LINDFIELD COMMUNITY HUB TRAFFIC MANAGEMENT PLAN BY PEOPLETRANS
ITEM NO: GB.11
20151110-OMC-Crs-2015/293203/479
APPENDIX NO: 1 - LINDFIELD COMMUNITY HUB TRAFFIC MANAGEMENT PLAN BY PEOPLETRANS
ITEM NO: GB.11
20151110-OMC-Crs-2015/293203/480
APPENDIX NO: 1 - LINDFIELD COMMUNITY HUB TRAFFIC MANAGEMENT PLAN BY PEOPLETRANS
ITEM NO: GB.11
20151110-OMC-Crs-2015/293203/481
APPENDIX NO: 1 - LINDFIELD COMMUNITY HUB TRAFFIC MANAGEMENT PLAN BY PEOPLETRANS
ITEM NO: GB.11
20151110-OMC-Crs-2015/293203/482
APPENDIX NO: 1 - LINDFIELD COMMUNITY HUB TRAFFIC MANAGEMENT PLAN BY PEOPLETRANS
ITEM NO: GB.11
20151110-OMC-Crs-2015/293203/483
APPENDIX NO: 1 - LINDFIELD COMMUNITY HUB TRAFFIC MANAGEMENT PLAN BY PEOPLETRANS
ITEM NO: GB.11
20151110-OMC-Crs-2015/293203/484
APPENDIX NO: 1 - LINDFIELD COMMUNITY HUB TRAFFIC MANAGEMENT PLAN BY PEOPLETRANS
ITEM NO: GB.11
20151110-OMC-Crs-2015/293203/485
APPENDIX NO: 1 - LINDFIELD COMMUNITY HUB TRAFFIC MANAGEMENT PLAN BY PEOPLETRANS
ITEM NO: GB.11
20151110-OMC-Crs-2015/293203/486
APPENDIX NO: 1 - LINDFIELD COMMUNITY HUB TRAFFIC MANAGEMENT PLAN BY PEOPLETRANS
ITEM NO: GB.11
20151110-OMC-Crs-2015/293203/487
APPENDIX NO: 1 - LINDFIELD COMMUNITY HUB TRAFFIC MANAGEMENT PLAN BY PEOPLETRANS
ITEM NO: GB.11
20151110-OMC-Crs-2015/293203/488
APPENDIX NO: 1 - LINDFIELD COMMUNITY HUB TRAFFIC MANAGEMENT PLAN BY PEOPLETRANS
ITEM NO: GB.11
20151110-OMC-Crs-2015/293203/489
APPENDIX NO: 1 - LINDFIELD COMMUNITY HUB TRAFFIC MANAGEMENT PLAN BY PEOPLETRANS
ITEM NO: GB.11
20151110-OMC-Crs-2015/293203/490
APPENDIX NO: 1 - LINDFIELD COMMUNITY HUB TRAFFIC MANAGEMENT PLAN BY PEOPLETRANS
ITEM NO: GB.11
20151110-OMC-Crs-2015/293203/491
APPENDIX NO: 1 - LINDFIELD COMMUNITY HUB TRAFFIC MANAGEMENT PLAN BY PEOPLETRANS
ITEM NO: GB.11
20151110-OMC-Crs-2015/293203/492
APPENDIX NO: 1 - LINDFIELD COMMUNITY HUB TRAFFIC MANAGEMENT PLAN BY PEOPLETRANS
ITEM NO: GB.11
20151110-OMC-Crs-2015/293203/493
APPENDIX NO: 1 - LINDFIELD COMMUNITY HUB TRAFFIC MANAGEMENT PLAN BY PEOPLETRANS
ITEM NO: GB.11
20151110-OMC-Crs-2015/293203/494
APPENDIX NO: 1 - LINDFIELD COMMUNITY HUB TRAFFIC MANAGEMENT PLAN BY PEOPLETRANS
ITEM NO: GB.11
20151110-OMC-Crs-2015/293203/495
APPENDIX NO: 1 - LINDFIELD COMMUNITY HUB TRAFFIC MANAGEMENT PLAN BY PEOPLETRANS
ITEM NO: GB.11
20151110-OMC-Crs-2015/293203/496
APPENDIX NO: 1 - LINDFIELD COMMUNITY HUB TRAFFIC MANAGEMENT PLAN BY PEOPLETRANS
ITEM NO: GB.11
20151110-OMC-Crs-2015/293203/497
APPENDIX NO: 1 - LINDFIELD COMMUNITY HUB TRAFFIC MANAGEMENT PLAN BY PEOPLETRANS
ITEM NO: GB.11
20151110-OMC-Crs-2015/293203/498
APPENDIX NO: 1 - LINDFIELD COMMUNITY HUB TRAFFIC MANAGEMENT PLAN BY PEOPLETRANS
ITEM NO: GB.11
20151110-OMC-Crs-2015/293203/499
APPENDIX NO: 1 - LINDFIELD COMMUNITY HUB TRAFFIC MANAGEMENT PLAN BY PEOPLETRANS
ITEM NO: GB.11
20151110-OMC-Crs-2015/293203/500
APPENDIX NO: 1 - LINDFIELD COMMUNITY HUB TRAFFIC MANAGEMENT PLAN BY PEOPLETRANS
ITEM NO: GB.11
20151110-OMC-Crs-2015/293203/501
APPENDIX NO: 1 - LINDFIELD COMMUNITY HUB TRAFFIC MANAGEMENT PLAN BY PEOPLETRANS
ITEM NO: GB.11
20151110-OMC-Crs-2015/293203/502
APPENDIX NO: 1 - LINDFIELD COMMUNITY HUB TRAFFIC MANAGEMENT PLAN BY PEOPLETRANS
ITEM NO: GB.11
20151110-OMC-Crs-2015/293203/503
APPENDIX NO: 1 - LINDFIELD COMMUNITY HUB TRAFFIC MANAGEMENT PLAN BY PEOPLETRANS
ITEM NO: GB.11
20151110-OMC-Crs-2015/293203/504
APPENDIX NO: 1 - LINDFIELD COMMUNITY HUB TRAFFIC MANAGEMENT PLAN BY PEOPLETRANS
ITEM NO: GB.11
20151110-OMC-Crs-2015/293203/505
APPENDIX NO: 1 - LINDFIELD COMMUNITY HUB TRAFFIC MANAGEMENT PLAN BY PEOPLETRANS
ITEM NO: GB.11
20151110-OMC-Crs-2015/293203/506
APPENDIX NO: 1 - LINDFIELD COMMUNITY HUB TRAFFIC MANAGEMENT PLAN BY PEOPLETRANS
ITEM NO: GB.11
20151110-OMC-Crs-2015/293203/507