APPENDIX-B5
Authority’s Engineer of NH-210 under NHD
Proposed Position :
Name of Firm :
Name of Staff:
Profession:
Date of Birth:
Years with Firm/Entity
Membership of Professional Societies
Detailed Task Assigned:
His duties will involve understanding the design provisions of both bridges/ROBs/flyovers and culverts, guiding and
checking of reinforcement/cable laying operations, rectifying any apparent mistakes in respect of them, checking and
controlling the proper mix designs, Checking the adequacy of proper form
curing operations. For this purpose, he will work in close coordination with the Material Engineer and the Contractor’s
Expert to effectively Control the qualit
bridges/culverts, whenever required during execution.
Summary of Qualification & Experience visS. No
Name of Employer
Post Held
1 Sheladia Associates Inc. USA
Bridge Engineer
2 URS Scott Wilson India Pvt. Ltd.
Bridge Engineer
3 Theme Engineering Services Pvt. Ltd.
Bridge Engineer
4 Voyants Solutions Pvt. Ltd.
Bridge Engineer
CV 05-
210 under NHDP-II in the state of Tamil Nadu
APPENDIX B-5: CURRICULUM VITAE (CV)
Bridge & Structural Engineer
Redecon (India) Pvt Ltd
Awadhesh Kumar Singh
Mourya Vihar Colony Sardar patel Marg Transport Nagar Kumhrar, Patna-26 Mob.-09668236754,09934451615
Civil Engineering
26th February 1963 (Proof of age enclosed)
Consent given to join Nationality: Indian
Member of Indian Road Congress Associate Member of Institution of Engineer (India) AMNO
His duties will involve understanding the design provisions of both bridges/ROBs/flyovers and culverts, guiding and
checking of reinforcement/cable laying operations, rectifying any apparent mistakes in respect of them, checking and
mix designs, Checking the adequacy of proper form-work, laying/compacting of concrete including
curing operations. For this purpose, he will work in close coordination with the Material Engineer and the Contractor’s
Expert to effectively Control the quality of execution. He will be responsible for minor modifications in design of
bridges/culverts, whenever required during execution.
Summary of Qualification & Experience vis-à-vis the requirements as per TOR
Project Name Period Assignment
in the ProjectFrom To
Four Laning of Panikoili-Remuli Section of NH-215 from Km: 0.000 to 163.000 in the State of Odissa
Oct’ 2013
Till Date
All activities of Construction Supervisionstructures
Independent Engineer for up gradation/improvement and Strengthening work for development of existing road from km 0/000 to 212.00 on the Jaipur-Bhilwara section of SH-12 in of Rajasthan
Feb’ 2012
Sep’ 2013
Independent Engineer
World Bank funded Construction Supervision for Widening and Strengthening of existing carriageway to two lanes from Km. 2.000 (Bhawanipatna) to Km. 70.000 (Khariar) of length 68 km on SH-16 in Orissa
Nov’ 2010
Feb’ 2012
All activities of Construction Supervisionstructures
Construction Supervision for Widening and Upgradation of Rai - Nahra -Bahadurgrah road (MDR-138) from Km. 0.00 to Km. 37.40 and Rohtak - Kharkhoda - Delhi Border (SH-18) from Km. 10.200 to Km. 40.760 of total length 67.96 km, Package No. HSRDC/NCR /2/2008 in
Jul’ 2008
Oct 2010
All activities of Construction Supervisionstructures
- Bridge Structural Engineer
Redecon (India) Pvt Ltd
Indian
Associate Member of Institution of Engineer (India) AMNO-083528-8
His duties will involve understanding the design provisions of both bridges/ROBs/flyovers and culverts, guiding and
checking of reinforcement/cable laying operations, rectifying any apparent mistakes in respect of them, checking and
work, laying/compacting of concrete including
curing operations. For this purpose, he will work in close coordination with the Material Engineer and the Contractor’s
y of execution. He will be responsible for minor modifications in design of
Assignment in the Project
Client of the Project
Remarks
All activities of Construction Supervision of structures
NHAI
Independent Engineer
PWD, Govt. of
Rajasthan
All activities of Construction Supervision of structures
PWD, Govt. of Orissa
All activities of Construction Supervision of structures
Haryana State
Roads & Bridges
APPENDIX-B5 CV 05- Bridge Structural Engineer
Authority’s Engineer of NH-210 under NHDP-II in the state of Tamil Nadu Redecon (India) Pvt Ltd
Haryana
5 Gherzi
Eastern
Limited
Bridge Engineer
Construction Supervision Consultancy Services for Improvement and upgradation of PIB: Buganpui-Lunglei Road- Construction of Aizawal Bypass including bridges and Rehabilitation and Maintenance of M-6 Zobawk-Haulawng Road upto Dawn village and M-16: Seleish-Thuampui Road in Mizoram.
Mar’ 2008
Jul’ 2008
All activities of Construction Supervision of structures
Govt. of Mizoram
6 EMA Unihorn (India) Pvt. Ltd.
Bridge Engineer
Construction Supervision for 6-laning of Panchi Gujran to Panipat Section of length 20 km from Km. 66.00 to Km. 86.00 of NH-1 in Haryana
Jan’ 2007
Feb’ 2008
All activities of Construction Supervision of structures
NHAI
7 Stanley Consultant Inc., New Delhi
Bridge Engineer
Construction Supervision for Widening and Strengthening of existing two lane to four lane road of length 19 km from Km. 507.000 to Km. 526.000 of Siliguri to Islampur section of NH-31 and Islampur bypass of length 10.31 km in WB.
Dec’ 2005
Dec’ 2006
All activities of Construction Supervision, Rehabilitation and Repair of structures
NHAI
8 AR Construction, Durgapur
Sr. Engineer (Structures)
Construction for Strengthening and Widening to 4-lane of Dhankuni – Kolaghat section from Km. 17.438 to Km. 71.438 on NH-6 in West Bengal
Jan’ 2002
Nov’ 2005
All activities of Construction Supervision, Rehabilitation and Repair of structures
NHAI
9 BSC-RBM-PATI (JV)
Site Engineer (Structures)
ADB funded Strengthening and Widening to 4-lane of Barwa Adda to Barakar section of NH-2 of length 142 km from Km. 398.750 to Km. 441.540 in Bihar
Jan’ 1998
Dec’ 2001
All activities of Construction Supervision, Rehabilitation and Repair of structures
NHAI
10 Sadbhav Engineering Ltd.
Site Engineer Widening and Strengthening of 2 lane highway of length 52.5 km from Km.0.000 (Sambalpur) to Km. 52.5 (Rourkela) of SH-10 in Orissa
Jan’ 1993
Dec’ 1997
All activities of Construction Supervision, Rehabilitation and Repair of structures
PWD, Govt. of Orissa
11 Crescent Construction Co.
Project Engineer
Construction of Multi-storied Buildings
Jan’ 1990
Dec’ 1992
Execution works
CIDCO
Educational Qualification:
• Degree in Civil Engineering (AMIE), Section A & B from the Institution of Engineers (India), Kolkata - Section A
in 1986 & Section B in 1992
Key Qualifications:
Mr. Awadhesh Kumar Singh is a Graduate Civil Engineer and have more than 22 years of professional experience
including more than 15 years of exclusive experience in the Construction and Construction Supervision of Major & Minor
Bridges, Flyovers and other cross-drainage structures funded by domestically and international funding agencies like
NHAI, World Bank & ADB under FIDIC and MORTH specifications.
His experience spectrum includes construction supervision of work as per approved working drawings and in conformity
with Technical Specifications, Recording of measurement of work and maintaining the Measurement Books as per norms
of the Client, Supervised construction of Group of Piles, Pile Caps, Well Foundation and Well Caps, Well Curbs,
APPENDIX-B5 CV 05- Bridge Structural Engineer
Authority’s Engineer of NH-210 under NHDP-II in the state of Tamil Nadu Redecon (India) Pvt Ltd
Pier Shafts and Abutment Shafts and Well Steining, Solid Slab, Bottom Plugs, Abutment Caps, Return Well and
Wing Wall, Directed works of Open Foundations, Pile Foundation, Well Foundation, Reinforced Earth Retaining Walls
with geo-grid as well as metallic strips, Tie Materials connected with Pre-cast Concrete Facia Panels, etc.
Executed Thirteen Major Bridges including one Flyover, two ROB’s on Pile & Well foundations, many minor bridges and
executed six projects in similar capacity. He has exposure construction using modern technology. He has good
experience in the field of Project Management using the latest Project Management Techniques, Design Review,
Budgeting, Project Monitoring, Planning & Scheduling of QA/ QC works in accordance with AASHTO/ ASTM/ BS/ IRC/
MOST/ IS Standards and Contract Technical Specifications, Evaluation of Extra Item of Works and recommendation for
Variation Orders, Site Instructions, Contract Management under FIDIC contract conditions, processing Contractual
Notices, Price adjustment aspects, scrutinizing/ checking/ certification of Advances/ Interim Bills/ Invoices, Settlement of
Claims. He has also in-depth knowledge of surface and subsurface exploration like undisturbed sampling, drilling bores,
standard penetration tests, plate load tests, standard cone penetration tests, and has been associated with scrutiny of
results, interpretation of and formulation of recommendations regarding foundation designs in various projects.
Worked on 2 ROB, 11 Major bridges with length more than 200m and 5 bridges on pile/well foundations including
a project funded by NHAI, Asian Development Bank, World Bank. Familiar with modern methods of construction of
bridges, design standards, technical specifications and statistical Quality Control/Assurance procedures for construction
of different components of bridges and has experience in construction of deep foundation viz. pile/well foundations.
Employment Record :
From October 2013– to date
Employer: Sheladia Associates Inc. USA
Project Name: Four Laning of Panikoili-Remuli Section of NH-215 from Km: 0.000 to 163.000 in the State
of Odissa under NHDP Phase-III as BOT (Toll) under DBFOT Pattern
Client: NHAI
Position Held: Bridge Engineer
Project Cost: INR 1410 Crores
Responsibilities � Check bar bending schedule as per relevant approved drawings, etc.
� Check layout of structures to be constructed.
� Verification of formwork, steel fabrication work, etc.
� Verifying and ensuring all safety precautions during the construction work.
� Monitoring progress of work
� Preparation of Progress Reports and other reports, as and when required, as per
contract agreement.
� Carrying out all activities of the Project including implementation of Quality Control
Program.
� Check and approve ‘as-built’ drawings prepared by the Concessionaire.
Structure Details:
• Bridge of length 360 m having a span arrangement of 12 x 30 m on Pile Foundation
with solid wall and wall type abutment and super structure PSC Girder.
• Bridge of length 110.25 m having a span arrangement of 3 x 31.5 m + 1 X 15.75 m on
open foundation with solid wall type abutment and super structure PSC & RCC Girder
• Bridge of length 107.5 m having a span arrangement of 5 x 21.5 m on open
foundation with solid wall type abutment and super structure PSC & RCC Girder
• Bridge of length 105.66 m having a span arrangement of 1 x 19.35 m + 2 X 22.35 m +
1 X 22.15 m + 1 X 19.46 m on open foundation with solid wall type abutment and
super structure RCC Girder
• ROB length of 81.3 m having a span arrangement of 1 x 25 +1 X 31.3 + 1 X 25 on
open foundation and super structure of PSC Girder.
• ROB length of 48 m having a span arrangement of 1 x 18 +1 X 30 on open foundation
and super structure of PSC Girder.
• Rehabilitation of Major Bridge of length 105.66 m repairing of wearing coats, Hand
APPENDIX-B5 CV 05- Bridge Structural Engineer
Authority’s Engineer of NH-210 under NHDP-II in the state of Tamil Nadu Redecon (India) Pvt Ltd
rails, expansion joints, approach slabs etc.
• Minor Bridges – 7 No’s
• Box Culverts - 104 No’s.
• Slab culverts – 10 No’s
• AUP – 6 No’s of 1 X 5 X 3
• VUP – 10 No’s of 1 X 12 X 5.5
• EUP – 2 No’s of 1 X 20 X 6
• PUP – 3 No’s of 1 X 5 X 3
From February 2012– to September 2013
Employer: URS Scott Wilson India Pvt. Ltd.
Project Name: Independent Engineer for up gradation/improvement and Strengthening work for
development of existing road from km 0/000 to 212.00 on the Jaipur-Bhilwara section of
SH-12 in the state of Rajasthan to be implemented on DBFOT Pattern
Client: PWD, Govt. of Rajasthan
Position Held: Bridge Engineer
Project Cost: INR 280 Crores
Responsibilities � Check bar bending schedule as per relevant approved drawings, etc.
� Check layout of structures to be constructed.
� Verification of formwork, steel fabrication work, etc.
� Verifying and ensuring all safety precautions during the construction work.
� Monitoring progress of work
� Preparation of Progress Reports and other reports, as and when required, as per
contract agreement.
� Carrying out all activities of the Project including implementation of Quality Control
Program.
� Check and approve ‘as-built’ drawings prepared by the Concessionaire.
Structure Details:
• Bridge of length 36 m having a span arrangement of 9 x 4 m on Open foundation Sub
structure RCC and superstructure RCC Box Girder.
• Bridge of length 37.5 m having a span arrangement of 7.5 x 5 m on open foundation
and superstructure solid deck slab.
• Bridge of length 36 m on open foundation and superstructure solid deck slab.
• No of Causeway 8 nos.
• 86 Slab culverts
• 108 pipe culverts
From November 2010 – to February 2012
Employer: Theme Engineering Services Pvt. Ltd.
Project Name: World Bank funded Construction Supervision for Widening and Strengthening of existing
carriageway to two lanes from Km. 2.000 (Bhawanipatna) to Km. 70.000 (Khariar) of
length 68 km on SH-16 under proposed Orissa State Road Projects in the state of Orissa
Client: PWD, Govt. of Orissa
Position Held: Bridge Engineer
Project Cost: INR 105 Crores
Responsibilities � Check bar bending schedule as per relevant approved drawings, etc.
� Check layout of structures to be constructed.
� Supervision of concrete work of various structures along the corridor, etc.
� Verification of formwork, steel fabrication work, etc.
� Verifying and ensuring all safety precautions during the construction work.
� Monitoring progress of work
APPENDIX-B5 CV 05- Bridge Structural Engineer
Authority’s Engineer of NH-210 under NHDP-II in the state of Tamil Nadu Redecon (India) Pvt Ltd
� Certification of joint measurements for completed works.
� Preparation of Progress Reports and other reports, as and when required, as per
contract agreement.
� Planning and monitoring of project works.
� Carrying out all activities of the Project including implementation of Quality Control
Program.
� Ensuring that the mixing, transportation, placing and paving operation of concrete are
carried out as per sound engineering practices and as per specifications.
� Contract Management, measurement and preparation of Interim Payment Bills.
� Check and approve ‘as-built’ drawings prepared by the Contractor.
Structure Details:
• Rehabilitation and Repair of Major Bridge of length 224.49 m having a span
arrangement of 7 x 32.07 m on well foundation of circular wall type with abutment and
pier and superstructure solid deck slab.
• Bridge of length 54.5 m having a span arrangement of 5 x 10.9 m on open foundation
and superstructure solid deck slab.
• Bridge of length 39.6 m on open foundation and superstructure solid deck slab.
• Bridge of length 36.8 m on open foundation and superstructure solid deck slab.
• 66 box culverts
• 54 pipe culverts
From July 2008 to October 2010
Employer: Voyants Solutions Pvt. Ltd.
Project Name: Construction Supervision for Widening and Upgradation of Rai - Nahra -Bahadurgrah road
(MDR-138) from Km. 0.00 to Km. 37.40 and Rohtak - Kharkhoda - Delhi Border (SH-18)
from Km. 10.200 to Km. 40.760 of total length 67.96 km, Package No.
HSRDC/NCR/2/2008 in the state of Haryana
Client: Haryana State Roads & Bridges
Position Held: Bridge Engineer
Project Cost: INR 142 Crores
Responsibilities � Executed lying of DLC and PQC as per MORTH Specifications.
� Executed initial and routine test of pile as per IS 2911 (Part-IV) 1985.
� Checking of bar bending schedule as per relevant approved drawings, etc.
� Checking of layout of structures to be constructed.
� Supervision of concrete work of various structures along the corridor, etc.
� Verification of formwork, steel fabrication work, etc.
� Verifying and ensuring all safety precautions during the construction work
� Monitoring progress of work
� Certification of measurement of completed works
� Checking of Variation Orders and checking of bills
� Check and approve ‘as-built’ drawings prepared by the contractor
� Preparation of Progress Reports and other reports, as and when required, as per
contract agreement.
� Planning and Monitoring of Execution Works
� Carrying out all activities of the Project including implementation of Quality Control
Program
� Ensuring that the mixing, transportation, placing and paving operation of concrete are
carried out as per sound engineering practices and as required by specifications
� Contract Management, measurement and preparation of Interim Payment Bills
Structure Details:
• Bridge of length 56.25 m having a span arrangement of 5 x 11.25 m on pile
foundation with wall type abutment and superstructure PSC solid slab.
APPENDIX-B5 CV 05- Bridge Structural Engineer
Authority’s Engineer of NH-210 under NHDP-II in the state of Tamil Nadu Redecon (India) Pvt Ltd
• Bridge of length 25 m of single span on pile foundation with wall type abutment and
superstructure PSC voided slab.
• 56 box culverts
• 54 pipe culverts
From March 2008 –July 2008
Employer: Gherzi Eastern Limited
Project Name: Construciton Supervision Consultancy Services for Improvement and upgradation
of PIB: Buganpui-Lunglei Road- Construction of Aizawal Bypass including bridges and
Rehabilitation and Maintenance of M-6 Zobawk-Haulawng Road upto Dawn village and
M-16: Seleish-Thuampui Road in the State of Mizoram.
Client: Govt. of Mizoram
Position Held: Bridge Engineer
Responsibilities � Checking and review of construction drawings.
� Checking of bar bending schedule as per relevant approved drawings, etc.
� Checking of layout of structures to be constructed.
� Supervision of concrete work of various structures along the corridor, etc.
� Checking of form work and staging as per the approved drawings.
� Coordination for procuring of approved materials at site.
� Monitoring progress of work
� Prepare construction supervision manual outlining the routines and procedures to be
applied in contract management, construction supervision and administration
� Prepare maintenance manual outlining routines for bridges and cross drainage works
� Issue monthly and quarterly progress reports
� Certify completion of parts or completion of works
� Assist client in formulation of clarifications and explanation to observations made by
auditor
� Preparation of variation orders
� Co-coordinating timely start and completion of works
� Provide additional services if required by the client
� Guide the teams about any remedies to common problems at site.
� Submit a monthly diary indicating all major activities, men and machinery deployed by
the contractor
� Attend all co-ordination meetings
� Certification of measurement of completed works
� Checking of Variation Orders and checking of bills
� Check and approve ‘as-built’ drawings prepared by the contractor
� Preparation of Progress Reports and other reports, as and when required, as per
contract agreement, etc.
Structure Details:
• Bridge of length 70 m of single span on open foundation of box cell rectangular type
and superstructure steel truss.
• Bridge of length 60 m of single span on open foundation of box cell rectangular type
and superstructure steel truss.
• Several drainage structures including introduction of ARMCO type culverts
From January2007 – February 2008
Employer: EMA Unihorn (India) Pvt. Ltd.
Project Name: Construction Supervision for 6-laning of Panchi Gujran to Panipat Section of length 20 km
from Km. 66.00 to Km. 86.00 of NH-1 in the state of Haryana
Client: National Highways Authority of India
Position Held: Assistant Bridge Engineer/Bridge Engineer
APPENDIX-B5 CV 05- Bridge Structural Engineer
Authority’s Engineer of NH-210 under NHDP-II in the state of Tamil Nadu Redecon (India) Pvt Ltd
Project Cost: INR 136 Crores
Responsibilities � Check and review of construction drawings.
� Checking of bar bending schedule as per relevant approved drawings.
� Checking of layout of structures to be constructed.
� Checking of form work and staging as per the approved drawings.
� Supervision of concrete work of various structures along the corridor.
� Understanding the design and drawings of bridges
� Critically review test results and checking design of false work, bearing, joints etc.
� Guiding and checking reinforcement/cable laying operations
� Rectifying mistakes, if any.
� Checking accuracy of form-work, laying compacting of concrete including curing
operations
� Monitoring the performance of key personnel of contractor’s staff and reporting to RE
� Carry out minor modification in design and drawings of bridges and culverts
whenever required in consultation with design consultant (PCC)
� Maintenance of structure related documents such as check list, pour card, approved
drawings and BBS.
� Coordination for procuring of approved materials at site.
� Certification of measurement of completed works
� Check and approve ‘as-built’ drawings prepared by the contractor
� Preparation of Progress Reports and other reports, as and when required, as per
contract agreement, etc.
Structure Details:
• 2 Bridges each of length 217.5 m having a span arrangement of 6 x 36.25 m on pile
foundation with solid wall & circular type abutment and superstructure PSC box
girder.
• Rehabilitation of minor bridge of length 30 m with span arrangement 3 x 10 m on
foundation open foundation and wall type and superstructure solid slab. The grouting
operations were taken up at the slab.
From December2005 – December2006
Employer: Stanley Consultant Inc., New Delhi
Project Name: Construction Supervision for Widening and Strengthening of existing two lane to four lane
road of length 19 km from Km. 507.000 to Km. 526.000 of Siliguri to Islampur section of
NH-31 and Islampur bypass of length 10.31 km in the state of West Bengal (Contract
Package No EW-II/WB-7)
Client: National Highways Authority of India
Position Held: Bridge Engineer
Project Cost: INR 231 Crores
Responsibilities � Quality check of concrete mix achieved at sites as per requirements by means of
control mix-design, batching plants and transit mixer sophisticated equipment like
Concrete Pump for transportation of green concrete have been used.
� Designed and prepared additional working drawings of culverts (slab as well as pipe)
drains and retaining walls, etc.
� Supervised the execution of slab seal expansion joints, strip seal expansion joints,
filler joints etc.
Structure Details:
• Chopra Bridge of length 105 m having a span arrangement of 5 x 21 m on well
foundation of 8m diameter and 15m depth of rectangular type solid wall substructure
and superstructure PSC voided slab.
• 19 Culverts
• 21 box culverts
APPENDIX-B5 CV 05- Bridge Structural Engineer
Authority’s Engineer of NH-210 under NHDP-II in the state of Tamil Nadu Redecon (India) Pvt Ltd
• Minor bridge having a single span of length 10 m on open foundation with solid deck
slab.
• Minor bridges and many culverts, underpasses, retaining wall as per detailed working
drawings and MORTH Specifications. Out of 6 well foundation of 8m diameter of 15m
depth. tilt and shift of well within the permissible limit.
From January2002–November2005
Employer: AR Construction, Durgapur
Project Name: Construction for Strengthening and Widening to 4-lane of Dhankuni – Kolaghat section
from Km. 17.438 to Km. 71.438 of length 54 km on NH-6 in the state of West Bengal
Client: National Highways Authority of India
Position Held: Sr. Engineer (Structures)
Project Cost: INR 393 Crores
Responsibilities � Remained in-charge of construction execution of structural works
� Executed installation of bridge bearings like POT, PTFF, PIN and guide bearings,
Elastomeric etc. expansion joints (strip seal & filler type).
� Implemented quality control for structural concrete as per approved method
statement, constructed RCC slab, RCC T Beam, PSC Box girders, PSC Voided &
solid slab and composite RCC Slab.
� Constructed different types of structures viz. group of piles and pile caps, well
foundation & well caps, pier shaft & abutment shaft, well curb, well steining pier cap,
bottom plugs, abutment cap, pedestals, return wall, wing wall and retaining wall, etc.
be applied in contract management, construction supervision and administration
� Prepare maintenance manual outlining routines for bridges and cross drainage works
� Issue monthly and quarterly progress reports, monthly status reports
� Issue annual reports
� Assist client in formulation of clarifications and explanation to observations made by
auditor
� Co-coordinating timely start and completion of works
� Executed the work of open foundation, pile foundation, well foundation & RERW with
AIMIL system (pre-cast concrete fascia panels ties with metallic strip)
Structure Details:
• Bridge of length 320m having a span arrangement of 8 x 40 m on pile foundation of
flat type solid slab substructure and superstructure PSC voided slab.
• 4 Minor bridge of length 32 m having a span arrangement of 3 x 10.66 m on open
foundation and superstructure solid deck slab.
• 41 slab culverts
• 39 pipe culverts
From January1998–December2001
Employer: BSC-RBM-PATI (JV)
Project Name: ADB funded Strengthening and Widening to 4-lane of Barwa Adda to Barakar section of
NH-2 of length 142 km from Km. 398.750 to Km. 441.540 in the state of Bihar
Client: National Highways Authority of India
Position Held: Site Engineer (Structures)
Project Cost: INR 133 Crores
Responsibilities � Construction supervision of structural works for MajorBridges, Culverts, Underpasses,
Reinforced Earth Walls, etc.
� Implemented quality control for structural concrete as per approved method of
statements.
� Constructed RCC slab, solid slab, group of piles & pile caps, well foundations & well
caps and retaining wall.
APPENDIX-B5 CV 05- Bridge Structural Engineer
Authority’s Engineer of NH-210 under NHDP-II in the state of Tamil Nadu Redecon (India) Pvt Ltd
� Executed the work of Open Foundation, Pile foundations, Well Foundations, etc.
� Execution and supervising the formwork and quality of concrete
� Recording and certification of measurements
� Preparation and checking of Bar Bending Schedules
� Maintaining the daily progress report
� Checking of reinforcement, BBS, Shuttering, Staging, Cable profile, Stressing of
tendons, Grouting of PSC cable ducts, etc.
� Preparation of various concrete mix designs based on tests on materials, etc.
Structure Details:
• Bridge of length 480m having a span arrangement of 48 x 10 m on well foundation
of circular type solid wall substructure and superstructure prestressed box girder.
• 24 Minor Bridges
• 2 Multi-span bridges with spans 12.5 m and 16.0 m having T-beam superstructures,
cross drainage works, approach roads, service roads include GSB, WMM, DBM and
BC.
From January1993–December1997
Employer: Sadbhav Engineering Ltd.
Project Name: Widening and Strengthening of 2 lane highway of length 52.5 km from Km.0.000
(Sambalpur) to Km. 52.5 (Rourkela) of SH-10 in the state of Orissa
Client: PWD, Govt. of Orissa
Position Held: Site Engineer
Project Cost: INR 65 Crores
Responsibilities � Checking and review of construction Drawings.
� Checking of Bar bending Schedule as per relevant approved drawings.
� Checking of layout of structures to be constructed, supervision of concrete works of
various structures, construction of Minor bridges, culverts RCC solid slab and open
foundation etc.
Structure Details:
• Rehabilitation of Kherwal bridge of length 220m having a span arrangement of 11
x 20 m on well foundation and superstructure solid deck slab. Replacement of
expansions joints and slope vet protection in superstructure.
• 4 minor bridges of lengths 25m, 30m, 42m and 55m on open foundations and
superstructure solid deck slab.
From January1990–December1992
Employer: Crescent Construction Co., Navy Mumbai
Project Name: Construction of Multi Storied Buildings
Client: CIDCO
Position Held: Project Engineer
Project Cost: INR 15 Crores
Responsibilities � Execution of RCC rafts foundation, columns, beams & slab (framed structure) as per drawings and specifications.
� Preparation of bills and materials testing reports and preparation of bar bending schedules.
� Planning and construction supervision at site � Management of men, material and machinery and its optimum utilization � Recording and certification of measurements executed, etc.
Languages Read Write Speak
English Excellent Excellent Excellent
Hindi Excellent Excellent Excellent
APPENDIX-B5 CV 05- Bridge Structural Engineer
Authority’s Engineer of NH-210 under NHDP-II in the state of Tamil Nadu Redecon (India) Pvt Ltd
Summary of Qualification & Experience vis-à-vis the requirements as per TOR Requirements as per TOR
(Enclosure-B) Possessed by the
Staff Member Break-up of experience
Brief Description of project Man- (1) Essential Qualifications. (a) Graduate in Civil Engineering from a recognized University. (b) Professional Experience of 15 years. (c) 10 years’ experience in Construction / Construction Supervision of bridge / interchange / any other structures. (d) Must be familiar with modern methods of construction of bridges/ROB/flyover involving RCC/pre-stress concrete, design standards, technical specifications and statistical Quality Control/Assurance procedures for construction of different component of bridges. (e) Experience in similar capacity in supervision of 2 Major Highway Bridges on Pile/Well foundation. (f) Experience in supervision of Rehabilitation and repair of 2 no’s Bridges. (g) Not more than 65 years of age. 2) Preferential Qualifications. (a) Post Graduate Degree in Structural Engineering. (b) Experience as a Bridge Engineer abroad.
(.a) Degree in Civil Engineering (AMIE), Section A & B from the Institution of Engineers (India), Kolkata - Section A in 1986 & Section B in 1992 (.b) 22 years experience (.c) more than 15 years of exclusive experience in the Construction and Construction Supervision of Major & Minor Bridges, Flyovers and other cross-drainage (d) Worked on 2 ROB, 11 Major bridges with length more than 200m and 5 bridges on pile/well foundations (e) Bridge of length 360 m- Panikoili-Remuli Section of NH-215 from Km: 0.000 to 163.000 on Pile/Well Foundation; 2 Bridges each of length 217.5 m on pile foundation 6-laning of Panchi Gujran to Panipat Section (Haryana) (f) No.of major and minor bridges taken up for rehabilitation and Repair including Major Bridge of length 224.49 m in section Km. 2.000 (Bhawanipatna) to Km. 70.000 (Khariar) (g) 51 years of age.
Four Laning of Panikoili-Remuli Section of NH-215 from Km: 0.000 to 163.000 in the State of Odissa under NHDP Phase-III as BOT (Toll) under DBFOT Pattern Bridge of length 360 m having a span arrangement of 12 x 30 m on Pile Foundation ROB length of 81.3 m ROB length of 48 m
0.92 years
Independent Engineer for up gradation/ improvement and Strengthening work for development of existing road from km 0/000 to 212.00 on the Jaipur-Bhilwara section of SH-12 in the state of Rajasthan to be implemented on DBFOT Pattern
1.67 years
Construction Supervision for Widening and Strengthening of existing carriageway to two lanes from Km. 2.000 (Bhawanipatna) to Km. 70.000 (Khariar) of length 68 km on SH-16 under proposed Orissa State Road Projects in the state of Orissa Major Bridge of length 224.49 m well foundation
1.33 years
Construction Supervision for Widening and Upgradation of Rai - Nahra -Bahadurgrah road (MDR-138) from Km. 0.00 to Km. 37.40 and Rohtak - Kharkhoda - Delhi Border (SH-18) from Km. 10.200 to Km. 40.760 of total length 67.96 km, Package No. HSRDC/NCR/2/2008
2.33 years
Construction Supervision for 6-laning of Panchi Gujran to Panipat Section length 20 km from Km. 66.00 to Km. 86.00 of NH-1 2 Bridges each of length 217.5 m pile foundation
1.08 years
Construction Supervision for Widening and Strengthening of existing two lane to four lane road of length 19 km from Km. 507.000 to Km. 526.000 of Siliguri to Islampur section of NH-31 and Islampur bypass of length 10.31 km in the state of West Bengal (Contract Package No EW-II/WB-7) Chopra Bridge of length 105 m span arrangement of 5 x 21 m on well foundation
1.08 years
Construction for Strengthening and Widening to 4-lane of Dhankuni – Kolaghat section from Km. 17.438 to Km. 71.438 of length 54 km on NH-6 Bridge of length 320m having a span arrangement of 8 x 40 m on pile foundation
2.95 years
Strengthening and Widening to 4-lane of Barwa Adda to Barakar section of NH-2 of length 142 km from Km. 398.750 to Km. 441.540 Bridge of length 480m having a span arrangement of 48 x 10 m on well foundation
3 years
Widening and Strengthening of 2 lane highway of length 52.5 km from Km.0.000 (Sambalpur) to Km. 52.5 (Rourkela) of SH-10 in the state of Orissa Rehabilitation of Kherwal bridge of length 220m well foundation
4 years
Certification by the Candidate
I, the undersigned, Awadhesh Kumar Singh undertake that this CV correctly describes myself, my qualifications and
my experience and Employer would be at liberty to debar me if any information given in the CV, in particular the
Summary of Qualification & Experience vis-à-vis the requirements as per TOR is found incorrect. I further undertake
APPENDIX-B5 CV 05- Bridge Structural Engineer
Authority’s Engineer of NH-210 under NHDP-II in the state of Tamil Nadu Redecon (India) Pvt Ltd
that I have neither been debarred by NHAI or any other central/stage government organization nor left
any assignment with the consultants engaged by Employer / contracting firm (Redecon (India) Pvt Ltd) for any
continuing work of Employer without completing my assignment. I will be available for the entire duration of the
current project “Consultancy services for Authority’s Engineer for Supervision of Improvement & Augmentation
of Karaikudi - Ramanathapuram section to 2 laning with Paved Shoulders from Km 94.000 to Km 174.000
(Existing Chainage from Km 94.000 to Km 174.000 of NH 210 including 500m on SH 35 – Madurai Road (near
Devakottai Rasta Railway Station) (Total Design Length 80.000 Km) on Engineering Procurement and
Construction (EPC) Mode under NHDP Phase-III in the State of Tamil Nadu”. If I leave this assignment in the
middle of the work, Employer would be at liberty to debar me from taking any assignment in any of the Employer
works for an appropriate period of time to be decided by the Employer. I have no objection if my services are
extended by the Employer for this work in future.
I further undertake that my CV is being proposed for this project by Redecon (India) Pvt Ltd and I have not given
consent to any other consultant(s) to propose my CV for any position for this project.
I further undertake that if due to my inability to work on this project due to unavoidable circumstances, due to
which consultant’s firm is forced to seek replacement. In such unavoidable circumstances, I shall not undertake
any employment in Employer projects during the period of assignment of this project and Employer shall consider my
CV invalid till such time.
I undertake that I have no objection in uploading/hosting of my credentials by Employer in public domain.
I further certify that I am associated with the following assignments as on date (as on 7 days prior to due date for
submission of proposal) including those for which LOA has been received by the firm and the inputs in these
assignments shall not affect the work of the current assignment.
Name of Assignment Client Date of LOA Likely start (Month / Year)
Likely end (Month /Year)
Total input of the Person (man-months)
N/A NA
………………………………………………………….. Date…………………………
(Signature of Key Personnel) (Day/Month/Year)
Certification by the firm
The undersigned on behalf of M/s Redecon (I) Pvt. Ltd. H-54, Kalkaji, New Delhi-110019 Ph.: 011-41605602 certify
that the qualification and experience details of Er. Awadhesh Kumar Singh as described in the CV has been checked
and found to be correct. It is also certified that Er. Awadhesh Kumar Singh to the best of our knowledge has
neither been debarred by NHAI or any other Central/State Government organization nor left his assignment with any
other consulting firm engaged by the Employer / Contracting firm (firm to be supervised now) for the ongoing
projects.
We understand that if the information about leaving the past assignment is known to the Employer, Employer
would be at liberty to remove the personnel from the present assignment and debar him for an appropriate period
to be decided by the Employer.
…………………………………………………… Date : ……………… [Signature of authorised representative of the Firm] (Day/Month/Year)
*******
APPENDIX-B5 CV 05- Bridge Structural Engineer
Authority’s Engineer of NH-210 under NHDP-II in the state of Tamil Nadu Redecon (India) Pvt Ltd
APPENDIX-B5 CV 05- Bridge Structural Engineer
Authority’s Engineer of NH-210 under NHDP-II in the state of Tamil Nadu Redecon (India) Pvt Ltd
APPENDIX-B5
Authority’s Engineer of NH-210 under NHD
CV 05-
210 under NHDP-II in the state of Tamil Nadu
- Bridge Structural Engineer
Redecon (India) Pvt Ltd
APPENDIX-B5
Authority’s Engineer of NH-210 under NHD
CV 05-
210 under NHDP-II in the state of Tamil Nadu
- Bridge Structural Engineer
Redecon (India) Pvt Ltd
APPENDIX-B5
Authority’s Engineer of NH-210 under NHD
CV 05-
210 under NHDP-II in the state of Tamil Nadu
- Bridge Structural Engineer
Redecon (India) Pvt Ltd
APPENDIX-B5
Authority’s Engineer of NH-210 under NHD
CV 05-
210 under NHDP-II in the state of Tamil Nadu
- Bridge Structural Engineer
Redecon (India) Pvt Ltd
APPENDIX-B5
Authority’s Engineer of NH-210 under NHD
CV 05-
210 under NHDP-II in the state of Tamil Nadu
- Bridge Structural Engineer
Redecon (India) Pvt Ltd
APPENDIX-B5 CV 05- Bridge Structural Engineer
Authority’s Engineer of NH-210 under NHDP-II in the state of Tamil Nadu Redecon (India) Pvt Ltd
APPENDIX-B5 CV 05- Bridge Structural Engineer
Authority’s Engineer of NH-210 under NHDP-II in the state of Tamil Nadu Redecon (India) Pvt Ltd
APPENDIX-B5 CV 05- Bridge Structural Engineer
Authority’s Engineer of NH-210 under NHDP-II in the state of Tamil Nadu Redecon (India) Pvt Ltd
APPENDIX-B5
Authority’s Engineer of NH-210 under NHD
CV 05-
210 under NHDP-II in the state of Tamil Nadu
- Bridge Structural Engineer
Redecon (India) Pvt Ltd
APPENDIX-B5
Authority’s Engineer of NH-210 under NHD
CV 05-
210 under NHDP-II in the state of Tamil Nadu
- Bridge Structural Engineer
Redecon (India) Pvt Ltd