Appendix 4.1 Details of Dust Emission Sources and Calculations

Appendix 4 - Environmental Protection Department...West Portion At-grade construction W-08 Area 835121 819227 172 16 0.5 11 0.000019878 0.000000224 0.000002695 0700 - 1900 West Portion

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Appendix 4 - Environmental Protection Department...West Portion At-grade construction W-08 Area 835121 819227 172 16 0.5 11 0.000019878 0.000000224 0.000002695 0700 - 1900 West Portion

Appendix 4.1

Details of Dust Emission Sources and Calculations

Page 2: Appendix 4 - Environmental Protection Department...West Portion At-grade construction W-08 Area 835121 819227 172 16 0.5 11 0.000019878 0.000000224 0.000002695 0700 - 1900 West Portion

Calculation of Emission factor for Heavy Construction (West, Central and East Portions)

E = 1.2tons/acre/month of activity (ref : AP-42 S13.2.3.3)

or = 2.69Mg/hectare/month of activity

Where

E = Emission Factor

Assume

For Annual Emission:

Mitigated (Working Hours)

Active operating area (%): 6 refer to Appendix 4.2 for justication

Mitigation efficiency (%): 91.70% watering once per hour

E (g/sq.m/day): 0.0515 Assume 26 working days per month and 12 working hours a day

E (g/sq.m/s): 0.000001193 calculated, 12 working hours per day

Mitigated (Working Hours) - Haul Road for Transportation

Active operating area (%): 100 asummed to be fully utilized

Mitigation efficiency (%): 91.70% watering once per hour

E (g/sq.m/day): 0.8587 Assume 26 working days per month and 12 working hours a day

E (g/sq.m/s): 0.000019878 calculated, 12 working hours per day

Unmitigated

Active operating area (%): 6 refer to Appendix 4.2 for justication

Mitigation efficiency (%): 0.00% unmitigated scenario

E (g/sq.m/day): 0.6208 Assume 26 working days per month and 12 working hours a day

E (g/sq.m/s): 0.000014370 calculated, 12 working hours per day

For 1-hour and 24-hour Emission:

Mitigated (Working Hours)

Active operating area (%): 100 asummed all works area are in full operation

Mitigation efficiency (%): 91.70% watering once per hour

E (g/sq.m/day): 0.8587 Assume 26 working days per month and 12 working hours a day

E (g/sq.m/s): 0.000019878 calculated, 12 working hours per day

Mitigated (Working Hours) - Haul Road for Transportation

Active operating area (%): 100 asummed to be fully utilized

Mitigation efficiency (%): 91.70% watering once per hour

E (g/sq.m/day): 0.8587 Assume 26 working days per month and 12 working hours a day

E (g/sq.m/s): 0.000019878 calculated, 12 working hours per day

Unmitigated

Active operating area (%): 100 asummed all works area are in full operation

Mitigation efficiency (%): 0.00% unmitigated scenario

E (g/sq.m/day): 10.3462 Assume 26 working days per month and 12 working hours a day

E (g/sq.m/s): 0.000239494 calculated, 12 working hours per day

G:\env\project\217722-70\12 Reports Deliverables\11 EIA Report\06 Final Submission\Chapter 4\Appendices\Appendix 4.1a - Dust Cals_rev2.xlsx Page 1 of 5

Page 3: Appendix 4 - Environmental Protection Department...West Portion At-grade construction W-08 Area 835121 819227 172 16 0.5 11 0.000019878 0.000000224 0.000002695 0700 - 1900 West Portion

Calculation of Emission factor for Wind Erosion (West, Central and East Portions)

E = 0.85 Mg/hectare/year (ref : AP-42 S11.9, Table 11.9.4)

= 0.2329 g/sqm/day

Where

E = Emission Factor

Assume

For Annual Emission:

Unmitigated (Non-working Hours and Working Hours)

Active operating area (%) 6 refer to Appendix 4.2 for justication

Mitigation efficiency (%) 0.00% no mitigation measure during non-working hours and unmitigated scenario

E (g/sq.m/hour) 0.000582192 calculated as in AP-42 (without mitigation measure)

E (g/sq.m/s) 0.000000162 calculated (unmitigated)

Mitigated (Working Hours)

Active operating area (%) 6 refer to Appendix 4.2 for justication

Mitigation efficiency (%) 91.70% watering once per hour

E (g/sq.m/hour) 0.000048322 calculated as in AP-42 (with watering once per hour)

E (g/sq.m/s) 0.000000013 calculated (mitigated)

For 1-hour and 24-hour Emission:

Unmitigated (Non-working Hours and Working Hours)

Active operating area (%) 100 asummed all works area are in full operation

Mitigation efficiency (%) 0.00% no mitigation measure during non-working hours and unmitigated scenario

E (g/sq.m/hour) 0.009703196 calculated as in AP-42 (without mitigation measure)

E (g/sq.m/s) 0.000002695 calculated (unmitigated)

Mitigated (Working Hours)

Active operating area (%) 100 asummed all works area are in full operation

Mitigation efficiency (%) 91.70% watering once per hour

E (g/sq.m/hour) 0.000805365 calculated as in AP-42 (with watering once per hour)

E (g/sq.m/s) 0.000000224 calculated (mitigated)

G:\env\project\217722-70\12 Reports Deliverables\11 EIA Report\06 Final Submission\Chapter 4\Appendices\Appendix 4.1a - Dust Cals_rev2.xlsx Page 2 of 5

Page 4: Appendix 4 - Environmental Protection Department...West Portion At-grade construction W-08 Area 835121 819227 172 16 0.5 11 0.000019878 0.000000224 0.000002695 0700 - 1900 West Portion

Calculation of Emission factor for Material Handling at Stockpile in East Portion

According to Section 13.2.4 of AP-42

where

E = Emission Factor in kg/megagram (Ref. AP42 S13.2.4)

k = Particle size multiplier, k = 0.74 as defined according to Table 2 of S13.2.4

U = Average wind speed from 2006 to 2010 (i.e. ~3.357m/s)

M =

E = 0.74 x (0.0016) x (3.357/2.2)^1.3/(2.0/2)^1.4

= 0.00205 kg/megagram

Maximum No. of trucks loading/unloading at stockpile = 16.7 per hour

Average carrying capacity for each truck = 11 tonne

Quantity of excavated materials loading at Stockpile = 184 megagram per hour

Mitigation efficiency (%) = 50.00% watering once per hour

Emission Rate = 0.00205 x 183.7 x (1 - 0.5)

= 0.18837 kg/hour

= 0.05233 g/s

Mitigated (Working Hours)

For Stockpile Area (Source ID E-SP02)

Emission Rate = 0.05233 g/s

Total Area for Stockpile = 5225 sq. m

Emission Rate per unit area = 0.000010015 g/sq.m/s

Unmitigated (Working Hours)

For Stockpile Area (Source ID E-SP02)

Emission Rate = 0.10465 g/s

Total Area for Stockpile = 5225 sq. m

Emission Rate per unit area = 0.000020029 g/sq.m/s

Material moisture content - Based on the GI sampling results, the moisture content of the soil samples at different depth (approx.

0.5m to 20m below ground) in the study area is in the range of 6-30% (see details in "Moisture Content of Soil Samples in Study

Area") . Considering the ambient relative humidity and the effect of evaporation when exposed to air, 2.0% is assumed in the

equation for conservative assessment.

)/(

2

M

2.2

U

k(0.0016) E4.1

3.1

megagramkg

G:\env\project\217722-70\12 Reports Deliverables\11 EIA Report\06 Final Submission\Chapter 4\Appendices\Appendix 4.1a - Dust Cals_rev2.xlsx Page 3 of 5

Page 5: Appendix 4 - Environmental Protection Department...West Portion At-grade construction W-08 Area 835121 819227 172 16 0.5 11 0.000019878 0.000000224 0.000002695 0700 - 1900 West Portion

Calculation of Emission factor for Material Handling at Barging Point

According to Section 13.2.4 of AP-42

where

E = Emission Factor in kg/megagram (Ref. AP42 S13.2.4)

k = Particle size multiplier, k = 0.74 as defined according to Table 2 of S13.2.4

U = Average wind speed from 2006 to 2010 (i.e. ~3.357m/s)

M =

E = 0.74 x (0.0016) x (3.357/2.2)^1.3/(2.0/2)^1.4

= 0.00205 kg/megagram

No. of trucks loading/unloading at each barging point = 10 per hour

Average carrying capacity for each truck = 11 tonne

Quantity of excavated materials loading at Stockpile = 110 megagram per hour

Mitigation efficiency (%) = 50.00%

Mitigated (Working Hours)

Emission Rate = 0.00205 x 110 x (1 - 0.5)

= 0.11280 kg/hour

= 0.03133 g/s

Unmitigated (Working Hours)

Emission Rate = 0.00205 x 110

= 0.22560 kg/hour

= 0.06267 g/s

3-side with top cover and water spraying system to be provided

Material moisture content - Based on the GI sampling results, the moisture content of the soil samples at different depth (approx.

0.5m to 20m below ground) in the study area is in the range of 6-30% (see details in "Moisture Content of Soil Samples in Study

Area") . Considering the ambient relative humidity and the effect of evaporation when exposed to air, 2.0% is assumed in the

equation for conservative assessment.

)/(

2

M

2.2

U

k(0.0016) E4.1

3.1

megagramkg

G:\env\project\217722-70\12 Reports Deliverables\11 EIA Report\06 Final Submission\Chapter 4\Appendices\Appendix 4.1a - Dust Cals_rev2.xlsx Page 4 of 5

Page 6: Appendix 4 - Environmental Protection Department...West Portion At-grade construction W-08 Area 835121 819227 172 16 0.5 11 0.000019878 0.000000224 0.000002695 0700 - 1900 West Portion

Moisture Content of Soil Samples in Study Area

Area Sample ID Depth (m) Sampling Date Moisture Content (%)

0.50 06-Dec-11 10.8

1.50 08-Dec-11 11.3

3.00-3.45 10-Dec-11 18.4

5.00-5.45 10-Dec-11 25.1

7.00-7.45 10-Dec-11 16.9

9.00-9.45 12-Dec-11 23.2

11.00-11.45 12-Dec-11 20.3

12.00-12.45 12-Dec-11 20.5

14.00-14.45 13-Dec-11 14.6

15.00-15.45 14-Dec-11 11.8

16.00-16.45 14-Dec-11 14.2

17.00-17.45 14-Dec-11 30.6

18.00-18.45 15-Dec-11 17.7

19.00-19.45 15-Dec-11 14.2

20.00-20.45 15-Dec-11 13.0

0.50 25-Nov-11 13.9

1.50 25-Nov-11 14.3

3.00-3.45 28-Nov-11 18.3

5.00-5.45 28-Nov-11 24.5

7.00-7.45 29-Nov-11 21.9

9.00-9.45 29-Nov-11 16.0

11.00-11.45 29-Nov-11 14.9

12.00-12.45 30-Nov-11 18.7

14.00-14.45 30-Nov-11 14.0

0.50 18-Feb-12 12.3

1.50 18-Feb-12 16.9

3.00-3.45 22-Feb-12 20.8

5.00-5.45 23-Feb-12 29.0

7.00-7.45 24-Feb-12 15.2

9.00-9.45 24-Feb-12 12.8

11.00-11.45 25-Feb-12 9.6

12.50-12.78 27-Feb-12 15.2

13.50 28-Feb-12 9.5

15.00-15.45 29-Feb-12 14.5

16.00-16.45 29-Feb-12 17.1

17.00 01-Mar-12 6.3

0.50 02-Mar-12 16.0

1.50 06-Mar-12 23.3

Eastern Portion (Ma

Tau Kok)

EBH10.50 27-Feb-12 17.9

Western Portion

(Yau Ma Tei)

WBH1(A)

WBH2(A)

WBH3

WBH4(B)

G:\env\project\217722-70\12 Reports Deliverables\11 EIA Report\06 Final Submission\Chapter 4\Appendices\Appendix 4.1a - Dust Cals_rev2.xlsx Page 5 of 5

Page 7: Appendix 4 - Environmental Protection Department...West Portion At-grade construction W-08 Area 835121 819227 172 16 0.5 11 0.000019878 0.000000224 0.000002695 0700 - 1900 West Portion

Location and Details of Worksites for Fugitive Dust Assessment - West Portion (CKR assoicated)

Tier 1 short-term (1-hour & 24-hour) assessment - Mitigated

X1 Y1 X2 Y2

(m) (m) (m) (m) (m) (deg / m) Working HoursNon-working

HoursWorking Hours

Non-working

Hours

Working Hours

[1]

Non-working

Hours [2]

West Portion At-grade construction W-01 Area 835083 819095 55 65 0.5 84 0.000019878 0.000000224 0.000002695 0700 - 1900

West Portion Cut & Cover Construction W-02 Area 835140 819075 40 57 0.5 63 0.000019878 0.000000224 0.000002695 0700 - 1900

West Portion Cut & Cover Construction W-03 Area 835208 819024 40 126 0.5 49 0.000019878 0.000000224 0.000002695 0700 - 1900

West Portion Cut & Cover Construction W-04 Area 835301 818955 40 99 0.5 60 0.000019878 0.000000224 0.000002695 0700 - 1900

West Portion Cut & Cover Construction W-05 Area 835401 818914 40 109 0.5 75 0.000019878 0.000000224 0.000002695 0700 - 1900

West Portion Cut & Cover Construction W-06 Area 835498 818897 40 79 0.5 88 0.000019878 0.000000224 0.000002695 0700 - 1900

West Portion Cut & Cover Construction W-07 Area 835585 818906 88 40 0.5 12 0.000019878 0.000000224 0.000002695 0700 - 1900

West Portion At-grade construction W-08 Area 835121 819227 172 16 0.5 11 0.000019878 0.000000224 0.000002695 0700 - 1900

West Portion At-grade construction W-09 Area 835088 819168 10 100 0.5 19 0.000019878 0.000000224 0.000002695 0700 - 1900

West Portion At-grade construction W-10 Area 834782 819339 6 107 0.5 22 0.000019878 0.000000224 0.000002695 0700 - 1900

West Portion At-grade construction W-11 Area 834818 819263 6 64 0.5 34 0.000019878 0.000000224 0.000002695 0700 - 1900

West Portion At-grade construction W-12 Area 834891 819197 22 135 0.5 56 0.000019878 0.000000224 0.000002695 0700 - 1900

West Portion At-grade construction W-13 Area 834998 819136 24 115 0.5 72 0.000019878 0.000000224 0.000002695 0700 - 1900

West Portion At-grade construction W-14 Area 835051 819168 27 111 0.5 34 0.000019878 0.000000224 0.000002695 0700 - 1900

West Portion At-grade construction W-17 Area 835063 818991 156 30 0.5 83 0.000019878 0.000000224 0.000002695 0700 - 1900

West Portion At-grade construction W-18 Area 834771 819299 9 184 0.5 41 0.000019878 0.000000224 0.000002695 0700 - 1900

West Portion At-grade construction W-19 Area 834823 819137 9 156 0.5 36 0.000019878 0.000000224 0.000002695 0700 - 1900

West Portion At-grade construction W-20 Area 834864 819128 7 106 0.5 18 0.000019878 0.000000224 0.000002695 0700 - 1900

West Portion At-grade construction W-21 Area 834995 819083 114 44 0.5 0 0.000019878 0.000000224 0.000002695 0700 - 1900

West Portion At-grade construction W-22 Area 834850 819099 165 12 0.5 1 0.000019878 0.000000224 0.000002695 0700 - 1900

West Portion At-grade construction W-23 Area 834868 819047 165 44 0.5 27 0.000019878 0.000000224 0.000002695 0700 - 1900

West Portion Ventilation Building W-24 Area 834768 819150 48 91 0.5 17 0.000019878 0.000000224 0.000002695 0700 - 1900

West Portion At-grade construction W-25 Area 834912 818931 31 231 0.5 10 0.000019878 0.000000224 0.000002695 0700 - 1900

West Portion At-grade construction W-26 Area 835064 819190 24 22 0.5 46 0.000019878 0.000000224 0.000002695 0700 - 1900

West Portion At-grade construction W-27 Area 835028 819152 34 22 0.5 46 0.000019878 0.000000224 0.000002695 0700 - 1900

West Portion At-grade construction W-28 Area 834999 819113 26 19 0.5 0 0.000019878 0.000000224 0.000002695 0700 - 1900

West Portion At-grade construction W-29 Area 834994 819040 42 12 0.5 75 0.000019878 0.000000224 0.000002695 0700 - 1900

West Portion At-grade construction W-30 Area 834971 818995 61 12 0.5 54 0.000019878 0.000000224 0.000002695 0700 - 1900

West Portion At-grade construction W-31 Area 835235 818939 60 57 0.5 0 0.000019878 0.000000224 0.000002695 0700 - 1900

West Portion At-grade construction W-32 Area 835470 818929 22 28 0.5 80 0.000019878 0.000000224 0.000002695 0700 - 1900

West Portion At-grade construction W-33 Area 835261 819042 3 90 0.5 12 0.000019878 0.000000224 0.000002695 0700 - 1900

West Portion At-grade construction W-34 Area 835300 819057 3 76 0.5 11 0.000019878 0.000000224 0.000002695 0700 - 1900

West Portion At-grade construction W-35 Area 835318 819055 3 84 0.5 9 0.000019878 0.000000224 0.000002695 0700 - 1900

West Portion At-grade construction W-36 Area 835326 819074 4 182 0.5 9 0.000019878 0.000000224 0.000002695 0700 - 1900

Note:

[1] Emission factor extracted from "Calculation of Emission Factor for Wind Erosion (West, Central and East Portions) - For 1-hour and 24-hour Emissions - Mitigated (Working Hours)".

[2] Emission factor extracted from "Calculation of Emission Factor for Wind Erosion (West, Central and East Portions) - For 1-hour and 24-hour Emissions - Unmitigated (Non-working Hours and Working Hours)".

Stockpiling

Emission Rate (g/s/sq.m)

Heavy Construction Wind ErosionSource ID

Source

Type

Coordinates of centroid Dimension (m)Height

Working Hour

Angle /

WidthLocation Sources/ Activities

G:\env\project\217722-70\12 Reports Deliverables\11 EIA Report\06 Final Submission\Chapter 4\Appendices\Appendix 4.1b - Dust info_rev2.xlsx Page 1 of 19

Page 8: Appendix 4 - Environmental Protection Department...West Portion At-grade construction W-08 Area 835121 819227 172 16 0.5 11 0.000019878 0.000000224 0.000002695 0700 - 1900 West Portion

Location and Details of Worksites for Fugitive Dust Assessment - West Portion (CKR assoicated)

Long-term (annual) assessment - Mitigated

X1 Y1 X2 Y2

(m) (m) (m) (m) (m) (deg / m) Working HoursNon-working

HoursWorking Hours

Non-working

Hours

Working Hours

[1]

Non-working

Hours [2]

West Portion At-grade construction W-01 Area 835083 819095 55 65 0.5 84 0.000001193 0.000000013 0.000000162 0700 - 1900

West Portion Cut & Cover Construction W-02 Area 835140 819075 40 57 0.5 63 0.000001193 0.000000013 0.000000162 0700 - 1900

West Portion Cut & Cover Construction W-03 Area 835208 819024 40 126 0.5 49 0.000001193 0.000000013 0.000000162 0700 - 1900

West Portion Cut & Cover Construction W-04 Area 835301 818955 40 99 0.5 60 0.000001193 0.000000013 0.000000162 0700 - 1900

West Portion Cut & Cover Construction W-05 Area 835401 818914 40 109 0.5 75 0.000001193 0.000000013 0.000000162 0700 - 1900

West Portion Cut & Cover Construction W-06 Area 835498 818897 40 79 0.5 88 0.000001193 0.000000013 0.000000162 0700 - 1900

West Portion Cut & Cover Construction W-07 Area 835585 818906 88 40 0.5 12 0.000001193 0.000000013 0.000000162 0700 - 1900

West Portion At-grade construction W-08 Area 835121 819227 172 16 0.5 11 0.000001193 0.000000013 0.000000162 0700 - 1900

West Portion At-grade construction W-09 Area 835088 819168 10 100 0.5 19 0.000001193 0.000000013 0.000000162 0700 - 1900

West Portion At-grade construction W-10 Area 834782 819339 6 107 0.5 22 0.000001193 0.000000013 0.000000162 0700 - 1900

West Portion At-grade construction W-11 Area 834818 819263 6 64 0.5 34 0.000001193 0.000000013 0.000000162 0700 - 1900

West Portion At-grade construction W-12 Area 834891 819197 22 135 0.5 56 0.000001193 0.000000013 0.000000162 0700 - 1900

West Portion At-grade construction W-13 Area 834998 819136 24 115 0.5 72 0.000001193 0.000000013 0.000000162 0700 - 1900

West Portion At-grade construction W-14 Area 835051 819168 27 111 0.5 34 0.000001193 0.000000013 0.000000162 0700 - 1900

West Portion At-grade construction W-17 Area 835063 818991 156 30 0.5 83 0.000001193 0.000000013 0.000000162 0700 - 1900

West Portion At-grade construction W-18 Area 834771 819299 9 184 0.5 41 0.000001193 0.000000013 0.000000162 0700 - 1900

West Portion At-grade construction W-19 Area 834823 819137 9 156 0.5 36 0.000001193 0.000000013 0.000000162 0700 - 1900

West Portion At-grade construction W-20 Area 834864 819128 7 106 0.5 18 0.000001193 0.000000013 0.000000162 0700 - 1900

West Portion At-grade construction W-21 Area 834995 819083 114 44 0.5 0 0.000001193 0.000000013 0.000000162 0700 - 1900

West Portion At-grade construction W-22 Area 834850 819099 165 12 0.5 1 0.000001193 0.000000013 0.000000162 0700 - 1900

West Portion At-grade construction W-23 Area 834868 819047 165 44 0.5 27 0.000001193 0.000000013 0.000000162 0700 - 1900

West Portion Ventilation Building W-24 Area 834768 819150 48 91 0.5 17 0.000001193 0.000000013 0.000000162 0700 - 1900

West Portion At-grade construction W-25 Area 834912 818931 31 231 0.5 10 0.000001193 0.000000013 0.000000162 0700 - 1900

West Portion At-grade construction W-26 Area 835064 819190 24 22 0.5 46 0.000001193 0.000000013 0.000000162 0700 - 1900

West Portion At-grade construction W-27 Area 835028 819152 34 22 0.5 46 0.000001193 0.000000013 0.000000162 0700 - 1900

West Portion At-grade construction W-28 Area 834999 819113 26 19 0.5 0 0.000001193 0.000000013 0.000000162 0700 - 1900

West Portion At-grade construction W-29 Area 834994 819040 42 12 0.5 75 0.000001193 0.000000013 0.000000162 0700 - 1900

West Portion At-grade construction W-30 Area 834971 818995 61 12 0.5 54 0.000001193 0.000000013 0.000000162 0700 - 1900

West Portion At-grade construction W-31 Area 835235 818939 60 57 0.5 0 0.000001193 0.000000013 0.000000162 0700 - 1900

West Portion At-grade construction W-32 Area 835470 818929 22 28 0.5 80 0.000001193 0.000000013 0.000000162 0700 - 1900

West Portion At-grade construction W-33 Area 835261 819042 3 90 0.5 12 0.000001193 0.000000013 0.000000162 0700 - 1900

West Portion At-grade construction W-34 Area 835300 819057 3 76 0.5 11 0.000001193 0.000000013 0.000000162 0700 - 1900

West Portion At-grade construction W-35 Area 835318 819055 3 84 0.5 9 0.000001193 0.000000013 0.000000162 0700 - 1900

West Portion At-grade construction W-36 Area 835326 819074 4 182 0.5 9 0.000001193 0.000000013 0.000000162 0700 - 1900

Note:

[1] Emission factor extracted from "Calculation of Emission Factor for Wind Erosion (West, Central and East Portions) - For Annual Emissions - Mitigated (Working Hours)".

[2] Emission factor extracted from "Calculation of Emission Factor for Wind Erosion (West, Central and East Portions) - For Annual Emissions - Unmitigated (Non-working Hours and Working Hours)".

Stockpiling

Emission Rate (g/s/sq.m)

Heavy Construction Wind ErosionSource ID

Source

Type

Coordinates of centroid Dimension (m)Height

Working Hour

Angle /

WidthLocation Sources/ Activities

G:\env\project\217722-70\12 Reports Deliverables\11 EIA Report\06 Final Submission\Chapter 4\Appendices\Appendix 4.1b - Dust info_rev2.xlsx Page 2 of 19

Page 9: Appendix 4 - Environmental Protection Department...West Portion At-grade construction W-08 Area 835121 819227 172 16 0.5 11 0.000019878 0.000000224 0.000002695 0700 - 1900 West Portion

Location and Details of Worksites for Fugitive Dust Assessment - West Portion (CKR assoicated)

Tier 2 short-term (1-hour & 24-hour) assessment (Case 1) - near Alhambra Building (Mitigated)

X1 Y1 X2 Y2

(m) (m) (m) (m) (m) (deg / m) Working HoursNon-working

HoursWorking Hours

Non-working

Hours

Working Hours

[1]

Non-working

Hours [2]

West Portion Cut & Cover Construction W-06 Area 835533 818896 40 9 0.5 88 0.000019878 0.000000224 0.000002695 0700 - 1900

West Portion Cut & Cover Construction W-07 Area 835585 818906 88 40 0.5 12 0.000019878 0.000000224 0.000002695 0700 - 1900

West Portion At-grade construction W-08 Area 835121 819227 172 16 0.5 11 0.000019878 0.000000224 0.000002695 0700 - 1900

West Portion At-grade construction W-09 Area 835088 819168 10 100 0.5 19 0.000019878 0.000000224 0.000002695 0700 - 1900

West Portion At-grade construction W-10 Area 834782 819339 6 107 0.5 22 0.000019878 0.000000224 0.000002695 0700 - 1900

West Portion At-grade construction W-11 Area 834818 819263 6 64 0.5 34 0.000019878 0.000000224 0.000002695 0700 - 1900

West Portion At-grade construction W-12 Area 834891 819197 22 135 0.5 56 0.000019878 0.000000224 0.000002695 0700 - 1900

West Portion At-grade construction W-13 Area 834998 819136 24 115 0.5 72 0.000019878 0.000000224 0.000002695 0700 - 1900

West Portion At-grade construction W-14 Area 835051 819168 27 111 0.5 34 0.000019878 0.000000224 0.000002695 0700 - 1900

West Portion At-grade construction W-17 Area 835063 818991 156 30 0.5 83 0.000019878 0.000000224 0.000002695 0700 - 1900

West Portion At-grade construction W-18 Area 834771 819299 9 184 0.5 41 0.000019878 0.000000224 0.000002695 0700 - 1900

West Portion At-grade construction W-19 Area 834823 819137 9 156 0.5 36 0.000019878 0.000000224 0.000002695 0700 - 1900

West Portion At-grade construction W-20 Area 834864 819128 7 106 0.5 18 0.000019878 0.000000224 0.000002695 0700 - 1900

West Portion At-grade construction W-21 Area 834995 819083 114 44 0.5 0 0.000019878 0.000000224 0.000002695 0700 - 1900

West Portion At-grade construction W-22 Area 834850 819099 165 12 0.5 1 0.000019878 0.000000224 0.000002695 0700 - 1900

West Portion At-grade construction W-23 Area 834868 819047 165 44 0.5 27 0.000019878 0.000000224 0.000002695 0700 - 1900

West Portion Ventilation Building W-24 Area 834768 819150 48 91 0.5 17 0.000019878 0.000000224 0.000002695 0700 - 1900

West Portion At-grade construction W-25 Area 834912 818931 31 231 0.5 10 0.000019878 0.000000224 0.000002695 0700 - 1900

West Portion At-grade construction W-26 Area 835064 819190 24 22 0.5 46 0.000019878 0.000000224 0.000002695 0700 - 1900

West Portion At-grade construction W-27 Area 835028 819152 34 22 0.5 46 0.000019878 0.000000224 0.000002695 0700 - 1900

West Portion At-grade construction W-28 Area 834999 819113 26 19 0.5 0 0.000019878 0.000000224 0.000002695 0700 - 1900

West Portion At-grade construction W-29 Area 834994 819040 42 12 0.5 75 0.000019878 0.000000224 0.000002695 0700 - 1900

West Portion At-grade construction W-30 Area 834971 818995 61 12 0.5 54 0.000019878 0.000000224 0.000002695 0700 - 1900

West Portion At-grade construction W-31 Area 835235 818939 60 57 0.5 0 0.000019878 0.000000224 0.000002695 0700 - 1900

West Portion At-grade construction W-32 Area 835470 818929 22 28 0.5 80 0.000019878 0.000000224 0.000002695 0700 - 1900

West Portion At-grade construction W-33 Area 835261 819042 3 90 0.5 12 0.000019878 0.000000224 0.000002695 0700 - 1900

West Portion At-grade construction W-34 Area 835300 819057 3 76 0.5 11 0.000019878 0.000000224 0.000002695 0700 - 1900

West Portion At-grade construction W-35 Area 835318 819055 3 84 0.5 9 0.000019878 0.000000224 0.000002695 0700 - 1900

West Portion At-grade construction W-36 Area 835326 819074 4 182 0.5 9 0.000019878 0.000000224 0.000002695 0700 - 1900

Note:

[1] Emission factor extracted from "Calculation of Emission Factor for Wind Erosion (West, Central and East Portions) - For 1-hour and 24-hour Emissions - Mitigated (Working Hours)".

[2] Emission factor extracted from "Calculation of Emission Factor for Wind Erosion (West, Central and East Portions) - For 1-hour and 24-hour Emissions - Unmitigated (Non-working Hours and Working Hours)".

StockpilingSource ID

Source

Type

Coordinates of centroid Dimension (m)Height

Working Hour

Angle /

Width

Emission Rate (g/s/sq.m)

Heavy Construction Wind ErosionLocation Sources/ Activities

G:\env\project\217722-70\12 Reports Deliverables\11 EIA Report\06 Final Submission\Chapter 4\Appendices\Appendix 4.1b - Dust info_rev2.xlsx Page 3 of 19

Page 10: Appendix 4 - Environmental Protection Department...West Portion At-grade construction W-08 Area 835121 819227 172 16 0.5 11 0.000019878 0.000000224 0.000002695 0700 - 1900 West Portion

Location and Details of Worksites for Fugitive Dust Assessment - West Portion (CKR assoicated)

Tier 2 short-term (1-hour & 24-hour) assessment (Case 2) - near Kum Lam Building (Mitigated)

X1 Y1 X2 Y2

(m) (m) (m) (m) (m) (deg / m) Working HoursNon-working

HoursWorking Hours

Non-working

Hours

Working Hours

[1]

Non-working

Hours [2]

West Portion Cut & Cover Construction W-06 Area 835513 818897 40 48 0.5 88 0.000019878 0.000000224 0.000002695 0700 - 1900

West Portion Cut & Cover Construction W-07 Area 835566 818901 48 40 0.5 12 0.000019878 0.000000224 0.000002695 0700 - 1900

West Portion At-grade construction W-08 Area 835121 819227 172 16 0.5 11 0.000019878 0.000000224 0.000002695 0700 - 1900

West Portion At-grade construction W-09 Area 835088 819168 10 100 0.5 19 0.000019878 0.000000224 0.000002695 0700 - 1900

West Portion At-grade construction W-10 Area 834782 819339 6 107 0.5 22 0.000019878 0.000000224 0.000002695 0700 - 1900

West Portion At-grade construction W-11 Area 834818 819263 6 64 0.5 34 0.000019878 0.000000224 0.000002695 0700 - 1900

West Portion At-grade construction W-12 Area 834891 819197 22 135 0.5 56 0.000019878 0.000000224 0.000002695 0700 - 1900

West Portion At-grade construction W-13 Area 834998 819136 24 115 0.5 72 0.000019878 0.000000224 0.000002695 0700 - 1900

West Portion At-grade construction W-14 Area 835051 819168 27 111 0.5 34 0.000019878 0.000000224 0.000002695 0700 - 1900

West Portion At-grade construction W-17 Area 835063 818991 156 30 0.5 83 0.000019878 0.000000224 0.000002695 0700 - 1900

West Portion At-grade construction W-18 Area 834771 819299 9 184 0.5 41 0.000019878 0.000000224 0.000002695 0700 - 1900

West Portion At-grade construction W-19 Area 834823 819137 9 156 0.5 36 0.000019878 0.000000224 0.000002695 0700 - 1900

West Portion At-grade construction W-20 Area 834864 819128 7 106 0.5 18 0.000019878 0.000000224 0.000002695 0700 - 1900

West Portion At-grade construction W-21 Area 834995 819083 114 44 0.5 0 0.000019878 0.000000224 0.000002695 0700 - 1900

West Portion At-grade construction W-22 Area 834850 819099 165 12 0.5 1 0.000019878 0.000000224 0.000002695 0700 - 1900

West Portion At-grade construction W-23 Area 834868 819047 165 44 0.5 27 0.000019878 0.000000224 0.000002695 0700 - 1900

West Portion Ventilation Building W-24 Area 834768 819150 48 91 0.5 17 0.000019878 0.000000224 0.000002695 0700 - 1900

West Portion At-grade construction W-25 Area 834912 818931 31 231 0.5 10 0.000019878 0.000000224 0.000002695 0700 - 1900

West Portion At-grade construction W-26 Area 835064 819190 24 22 0.5 46 0.000019878 0.000000224 0.000002695 0700 - 1900

West Portion At-grade construction W-27 Area 835028 819152 34 22 0.5 46 0.000019878 0.000000224 0.000002695 0700 - 1900

West Portion At-grade construction W-28 Area 834999 819113 26 19 0.5 0 0.000019878 0.000000224 0.000002695 0700 - 1900

West Portion At-grade construction W-29 Area 834994 819040 42 12 0.5 75 0.000019878 0.000000224 0.000002695 0700 - 1900

West Portion At-grade construction W-30 Area 834971 818995 61 12 0.5 54 0.000019878 0.000000224 0.000002695 0700 - 1900

West Portion At-grade construction W-31 Area 835235 818939 60 57 0.5 0 0.000019878 0.000000224 0.000002695 0700 - 1900

West Portion At-grade construction W-32 Area 835470 818929 22 28 0.5 80 0.000019878 0.000000224 0.000002695 0700 - 1900

West Portion At-grade construction W-33 Area 835261 819042 3 90 0.5 12 0.000019878 0.000000224 0.000002695 0700 - 1900

West Portion At-grade construction W-34 Area 835300 819057 3 76 0.5 11 0.000019878 0.000000224 0.000002695 0700 - 1900

West Portion At-grade construction W-35 Area 835318 819055 3 84 0.5 9 0.000019878 0.000000224 0.000002695 0700 - 1900

West Portion At-grade construction W-36 Area 835326 819074 4 182 0.5 9 0.000019878 0.000000224 0.000002695 0700 - 1900

Note:

[1] Emission factor extracted from "Calculation of Emission Factor for Wind Erosion (West, Central and East Portions) - For 1-hour and 24-hour Emissions - Mitigated (Working Hours)".

[2] Emission factor extracted from "Calculation of Emission Factor for Wind Erosion (West, Central and East Portions) - For 1-hour and 24-hour Emissions - Unmitigated (Non-working Hours and Working Hours)".

Angle /

Width

Emission Rate (g/s/sq.m)

Working HourHeavy Construction Stockpiling Wind Erosion

Source IDSource

Type

Coordinates of centroid Dimension (m)Height

Location Sources/ Activities

G:\env\project\217722-70\12 Reports Deliverables\11 EIA Report\06 Final Submission\Chapter 4\Appendices\Appendix 4.1b - Dust info_rev2.xlsx Page 4 of 19

Page 11: Appendix 4 - Environmental Protection Department...West Portion At-grade construction W-08 Area 835121 819227 172 16 0.5 11 0.000019878 0.000000224 0.000002695 0700 - 1900 West Portion

Location and Details of Worksites for Fugitive Dust Assessment - West Portion (CKR assoicated)

Tier 2 short-term (1-hour & 24-hour) assessment (Case 3) - near Dickson Building (Mitigated)

X1 Y1 X2 Y2

(m) (m) (m) (m) (m) (deg / m) Working HoursNon-working

HoursWorking Hours

Non-working

Hours

Working Hours

[1]

Non-working

Hours [2]

West Portion Cut & Cover Construction W-05 Area 835430 818907 40 49 0.5 75 0.000019878 0.000000224 0.000002695 0700 - 1900

West Portion Cut & Cover Construction W-06 Area 835483 818897 40 49 0.5 88 0.000019878 0.000000224 0.000002695 0700 - 1900

West Portion At-grade construction W-08 Area 835121 819227 172 16 0.5 11 0.000019878 0.000000224 0.000002695 0700 - 1900

West Portion At-grade construction W-09 Area 835088 819168 10 100 0.5 19 0.000019878 0.000000224 0.000002695 0700 - 1900

West Portion At-grade construction W-10 Area 834782 819339 6 107 0.5 22 0.000019878 0.000000224 0.000002695 0700 - 1900

West Portion At-grade construction W-11 Area 834818 819263 6 64 0.5 34 0.000019878 0.000000224 0.000002695 0700 - 1900

West Portion At-grade construction W-12 Area 834891 819197 22 135 0.5 56 0.000019878 0.000000224 0.000002695 0700 - 1900

West Portion At-grade construction W-13 Area 834998 819136 24 115 0.5 72 0.000019878 0.000000224 0.000002695 0700 - 1900

West Portion At-grade construction W-14 Area 835051 819168 27 111 0.5 34 0.000019878 0.000000224 0.000002695 0700 - 1900

West Portion At-grade construction W-17 Area 835063 818991 156 30 0.5 83 0.000019878 0.000000224 0.000002695 0700 - 1900

West Portion At-grade construction W-18 Area 834771 819299 9 184 0.5 41 0.000019878 0.000000224 0.000002695 0700 - 1900

West Portion At-grade construction W-19 Area 834823 819137 9 156 0.5 36 0.000019878 0.000000224 0.000002695 0700 - 1900

West Portion At-grade construction W-20 Area 834864 819128 7 106 0.5 18 0.000019878 0.000000224 0.000002695 0700 - 1900

West Portion At-grade construction W-21 Area 834995 819083 114 44 0.5 0 0.000019878 0.000000224 0.000002695 0700 - 1900

West Portion At-grade construction W-22 Area 834850 819099 165 12 0.5 1 0.000019878 0.000000224 0.000002695 0700 - 1900

West Portion At-grade construction W-23 Area 834868 819047 165 44 0.5 27 0.000019878 0.000000224 0.000002695 0700 - 1900

West Portion Ventilation Building W-24 Area 834768 819150 48 91 0.5 17 0.000019878 0.000000224 0.000002695 0700 - 1900

West Portion At-grade construction W-25 Area 834912 818931 31 231 0.5 10 0.000019878 0.000000224 0.000002695 0700 - 1900

West Portion At-grade construction W-26 Area 835064 819190 24 22 0.5 46 0.000019878 0.000000224 0.000002695 0700 - 1900

West Portion At-grade construction W-27 Area 835028 819152 34 22 0.5 46 0.000019878 0.000000224 0.000002695 0700 - 1900

West Portion At-grade construction W-28 Area 834999 819113 26 19 0.5 0 0.000019878 0.000000224 0.000002695 0700 - 1900

West Portion At-grade construction W-29 Area 834994 819040 42 12 0.5 75 0.000019878 0.000000224 0.000002695 0700 - 1900

West Portion At-grade construction W-30 Area 834971 818995 61 12 0.5 54 0.000019878 0.000000224 0.000002695 0700 - 1900

West Portion At-grade construction W-31 Area 835235 818939 60 57 0.5 0 0.000019878 0.000000224 0.000002695 0700 - 1900

West Portion At-grade construction W-32 Area 835470 818929 22 28 0.5 80 0.000019878 0.000000224 0.000002695 0700 - 1900

West Portion At-grade construction W-33 Area 835261 819042 3 90 0.5 12 0.000019878 0.000000224 0.000002695 0700 - 1900

West Portion At-grade construction W-34 Area 835300 819057 3 76 0.5 11 0.000019878 0.000000224 0.000002695 0700 - 1900

West Portion At-grade construction W-35 Area 835318 819055 3 84 0.5 9 0.000019878 0.000000224 0.000002695 0700 - 1900

West Portion At-grade construction W-36 Area 835326 819074 4 182 0.5 9 0.000019878 0.000000224 0.000002695 0700 - 1900

Note:

[1] Emission factor extracted from "Calculation of Emission Factor for Wind Erosion (West, Central and East Portions) - For 1-hour and 24-hour Emissions - Mitigated (Working Hours)".

[2] Emission factor extracted from "Calculation of Emission Factor for Wind Erosion (West, Central and East Portions) - For 1-hour and 24-hour Emissions - Unmitigated (Non-working Hours and Working Hours)".

Angle /

Width

Emission Rate (g/s/sq.m)

Working HourHeavy Construction Stockpiling Wind Erosion

Source IDSource

Type

Coordinates of centroid Dimension (m)Height

Location Sources/ Activities

G:\env\project\217722-70\12 Reports Deliverables\11 EIA Report\06 Final Submission\Chapter 4\Appendices\Appendix 4.1b - Dust info_rev2.xlsx Page 5 of 19

Page 12: Appendix 4 - Environmental Protection Department...West Portion At-grade construction W-08 Area 835121 819227 172 16 0.5 11 0.000019878 0.000000224 0.000002695 0700 - 1900 West Portion

Location and Details of Worksites for Fugitive Dust Assessment - West Portion (CKR assoicated)

Tier 1 short-term (1-hour & 24-hour) assessment - Unmitigated

X1 Y1 X2 Y2

(m) (m) (m) (m) (m) (deg / m) Working HoursNon-working

HoursWorking Hours

Non-working

Hours

Working Hours

[1]

Non-working

Hours [1]

West Portion At-grade construction W-01 Area 835083 819095 55 65 0.5 84 0.000239494 0.000002695 0.000002695 0700 - 1900

West Portion Cut & Cover Construction W-02 Area 835140 819075 40 57 0.5 63 0.000239494 0.000002695 0.000002695 0700 - 1900

West Portion Cut & Cover Construction W-03 Area 835208 819024 40 126 0.5 49 0.000239494 0.000002695 0.000002695 0700 - 1900

West Portion Cut & Cover Construction W-04 Area 835301 818955 40 99 0.5 60 0.000239494 0.000002695 0.000002695 0700 - 1900

West Portion Cut & Cover Construction W-05 Area 835401 818914 40 109 0.5 75 0.000239494 0.000002695 0.000002695 0700 - 1900

West Portion Cut & Cover Construction W-06 Area 835498 818897 40 79 0.5 88 0.000239494 0.000002695 0.000002695 0700 - 1900

West Portion Cut & Cover Construction W-07 Area 835585 818906 88 40 0.5 12 0.000239494 0.000002695 0.000002695 0700 - 1900

West Portion At-grade construction W-08 Area 835121 819227 172 16 0.5 11 0.000239494 0.000002695 0.000002695 0700 - 1900

West Portion At-grade construction W-09 Area 835088 819168 10 100 0.5 19 0.000239494 0.000002695 0.000002695 0700 - 1900

West Portion At-grade construction W-10 Area 834782 819339 6 107 0.5 22 0.000239494 0.000002695 0.000002695 0700 - 1900

West Portion At-grade construction W-11 Area 834818 819263 6 64 0.5 34 0.000239494 0.000002695 0.000002695 0700 - 1900

West Portion At-grade construction W-12 Area 834891 819197 22 135 0.5 56 0.000239494 0.000002695 0.000002695 0700 - 1900

West Portion At-grade construction W-13 Area 834998 819136 24 115 0.5 72 0.000239494 0.000002695 0.000002695 0700 - 1900

West Portion At-grade construction W-14 Area 835051 819168 27 111 0.5 34 0.000239494 0.000002695 0.000002695 0700 - 1900

West Portion At-grade construction W-17 Area 835063 818991 156 30 0.5 83 0.000239494 0.000002695 0.000002695 0700 - 1900

West Portion At-grade construction W-18 Area 834771 819299 9 184 0.5 41 0.000239494 0.000002695 0.000002695 0700 - 1900

West Portion At-grade construction W-19 Area 834823 819137 9 156 0.5 36 0.000239494 0.000002695 0.000002695 0700 - 1900

West Portion At-grade construction W-20 Area 834864 819128 7 106 0.5 18 0.000239494 0.000002695 0.000002695 0700 - 1900

West Portion At-grade construction W-21 Area 834995 819083 114 44 0.5 0 0.000239494 0.000002695 0.000002695 0700 - 1900

West Portion At-grade construction W-22 Area 834850 819099 165 12 0.5 1 0.000239494 0.000002695 0.000002695 0700 - 1900

West Portion At-grade construction W-23 Area 834868 819047 165 44 0.5 27 0.000239494 0.000002695 0.000002695 0700 - 1900

West Portion Ventilation Building W-24 Area 834768 819150 48 91 0.5 17 0.000239494 0.000002695 0.000002695 0700 - 1900

West Portion At-grade construction W-25 Area 834912 818931 31 231 0.5 10 0.000239494 0.000002695 0.000002695 0700 - 1900

West Portion At-grade construction W-26 Area 835064 819190 24 22 0.5 46 0.000239494 0.000002695 0.000002695 0700 - 1900

West Portion At-grade construction W-27 Area 835028 819152 34 22 0.5 46 0.000239494 0.000002695 0.000002695 0700 - 1900

West Portion At-grade construction W-28 Area 834999 819113 26 19 0.5 0 0.000239494 0.000002695 0.000002695 0700 - 1900

West Portion At-grade construction W-29 Area 834994 819040 42 12 0.5 75 0.000239494 0.000002695 0.000002695 0700 - 1900

West Portion At-grade construction W-30 Area 834971 818995 61 12 0.5 54 0.000239494 0.000002695 0.000002695 0700 - 1900

West Portion At-grade construction W-31 Area 835235 818939 60 57 0.5 0 0.000239494 0.000002695 0.000002695 0700 - 1900

West Portion At-grade construction W-32 Area 835470 818929 22 28 0.5 80 0.000239494 0.000002695 0.000002695 0700 - 1900

West Portion At-grade construction W-33 Area 835261 819042 3 90 0.5 12 0.000239494 0.000002695 0.000002695 0700 - 1900

West Portion At-grade construction W-34 Area 835300 819057 3 76 0.5 11 0.000239494 0.000002695 0.000002695 0700 - 1900

West Portion At-grade construction W-35 Area 835318 819055 3 84 0.5 9 0.000239494 0.000002695 0.000002695 0700 - 1900

West Portion At-grade construction W-36 Area 835326 819074 4 182 0.5 9 0.000239494 0.000002695 0.000002695 0700 - 1900

Note:

[1] Emission factor extracted from "Calculation of Emission Factor for Wind Erosion (West, Central and East Portions) - For 1-hour and 24-hour Emissions - Unmitigated (Non-working Hours and Working Hours)".

StockpilingSource ID

Source

Type

Coordinates of centroid Dimension (m)Height

Working Hour

Angle /

Width

Emission Rate (g/s/sq.m)

Heavy Construction Wind ErosionLocation Sources/ Activities

G:\env\project\217722-70\12 Reports Deliverables\11 EIA Report\06 Final Submission\Chapter 4\Appendices\Appendix 4.1b - Dust info_rev2.xlsx Page 6 of 19

Page 13: Appendix 4 - Environmental Protection Department...West Portion At-grade construction W-08 Area 835121 819227 172 16 0.5 11 0.000019878 0.000000224 0.000002695 0700 - 1900 West Portion

Location and Details of Worksites for Fugitive Dust Assessment - West Portion (CKR assoicated)

Long-term (annual) assessment - Unmitigated

X1 Y1 X2 Y2

(m) (m) (m) (m) (m) (deg / m) Working HoursNon-working

HoursWorking Hours

Non-working

Hours

Working Hours

[1]

Non-working

Hours [1]

West Portion At-grade construction W-01 Area 835083 819095 55 65 0.5 84 0.000014370 0.000000162 0.000000162 0700 - 1900

West Portion Cut & Cover Construction W-02 Area 835140 819075 40 57 0.5 63 0.000014370 0.000000162 0.000000162 0700 - 1900

West Portion Cut & Cover Construction W-03 Area 835208 819024 40 126 0.5 49 0.000014370 0.000000162 0.000000162 0700 - 1900

West Portion Cut & Cover Construction W-04 Area 835301 818955 40 99 0.5 60 0.000014370 0.000000162 0.000000162 0700 - 1900

West Portion Cut & Cover Construction W-05 Area 835401 818914 40 109 0.5 75 0.000014370 0.000000162 0.000000162 0700 - 1900

West Portion Cut & Cover Construction W-06 Area 835498 818897 40 79 0.5 88 0.000014370 0.000000162 0.000000162 0700 - 1900

West Portion Cut & Cover Construction W-07 Area 835585 818906 88 40 0.5 12 0.000014370 0.000000162 0.000000162 0700 - 1900

West Portion At-grade construction W-08 Area 835121 819227 172 16 0.5 11 0.000014370 0.000000162 0.000000162 0700 - 1900

West Portion At-grade construction W-09 Area 835088 819168 10 100 0.5 19 0.000014370 0.000000162 0.000000162 0700 - 1900

West Portion At-grade construction W-10 Area 834782 819339 6 107 0.5 22 0.000014370 0.000000162 0.000000162 0700 - 1900

West Portion At-grade construction W-11 Area 834818 819263 6 64 0.5 34 0.000014370 0.000000162 0.000000162 0700 - 1900

West Portion At-grade construction W-12 Area 834891 819197 22 135 0.5 56 0.000014370 0.000000162 0.000000162 0700 - 1900

West Portion At-grade construction W-13 Area 834998 819136 24 115 0.5 72 0.000014370 0.000000162 0.000000162 0700 - 1900

West Portion At-grade construction W-14 Area 835051 819168 27 111 0.5 34 0.000014370 0.000000162 0.000000162 0700 - 1900

West Portion At-grade construction W-17 Area 835063 818991 156 30 0.5 83 0.000014370 0.000000162 0.000000162 0700 - 1900

West Portion At-grade construction W-18 Area 834771 819299 9 184 0.5 41 0.000014370 0.000000162 0.000000162 0700 - 1900

West Portion At-grade construction W-19 Area 834823 819137 9 156 0.5 36 0.000014370 0.000000162 0.000000162 0700 - 1900

West Portion At-grade construction W-20 Area 834864 819128 7 106 0.5 18 0.000014370 0.000000162 0.000000162 0700 - 1900

West Portion At-grade construction W-21 Area 834995 819083 114 44 0.5 0 0.000014370 0.000000162 0.000000162 0700 - 1900

West Portion At-grade construction W-22 Area 834850 819099 165 12 0.5 1 0.000014370 0.000000162 0.000000162 0700 - 1900

West Portion At-grade construction W-23 Area 834868 819047 165 44 0.5 27 0.000014370 0.000000162 0.000000162 0700 - 1900

West Portion Ventilation Building W-24 Area 834768 819150 48 91 0.5 17 0.000014370 0.000000162 0.000000162 0700 - 1900

West Portion At-grade construction W-25 Area 834912 818931 31 231 0.5 10 0.000014370 0.000000162 0.000000162 0700 - 1900

West Portion At-grade construction W-26 Area 835064 819190 24 22 0.5 46 0.000014370 0.000000162 0.000000162 0700 - 1900

West Portion At-grade construction W-27 Area 835028 819152 34 22 0.5 46 0.000014370 0.000000162 0.000000162 0700 - 1900

West Portion At-grade construction W-28 Area 834999 819113 26 19 0.5 0 0.000014370 0.000000162 0.000000162 0700 - 1900

West Portion At-grade construction W-29 Area 834994 819040 42 12 0.5 75 0.000014370 0.000000162 0.000000162 0700 - 1900

West Portion At-grade construction W-30 Area 834971 818995 61 12 0.5 54 0.000014370 0.000000162 0.000000162 0700 - 1900

West Portion At-grade construction W-31 Area 835235 818939 60 57 0.5 0 0.000014370 0.000000162 0.000000162 0700 - 1900

West Portion At-grade construction W-32 Area 835470 818929 22 28 0.5 80 0.000014370 0.000000162 0.000000162 0700 - 1900

West Portion At-grade construction W-33 Area 835261 819042 3 90 0.5 12 0.000014370 0.000000162 0.000000162 0700 - 1900

West Portion At-grade construction W-34 Area 835300 819057 3 76 0.5 11 0.000014370 0.000000162 0.000000162 0700 - 1900

West Portion At-grade construction W-35 Area 835318 819055 3 84 0.5 9 0.000014370 0.000000162 0.000000162 0700 - 1900

West Portion At-grade construction W-36 Area 835326 819074 4 182 0.5 9 0.000014370 0.000000162 0.000000162 0700 - 1900

Note:

[1] Emission factor extracted from "Calculation of Emission Factor for Wind Erosion (West, Central and East Portions) - For Annual Emissions - Unmitigated (Non-working Hours and Working Hours)".

StockpilingWorking Hour

Angle /

WidthLocation

Emission Rate (g/s/sq.m)

Heavy Construction Wind ErosionSource ID

Source

Type

Coordinates of centroid Dimension (m)Height

Sources/ Activities

G:\env\project\217722-70\12 Reports Deliverables\11 EIA Report\06 Final Submission\Chapter 4\Appendices\Appendix 4.1b - Dust info_rev2.xlsx Page 7 of 19

Page 14: Appendix 4 - Environmental Protection Department...West Portion At-grade construction W-08 Area 835121 819227 172 16 0.5 11 0.000019878 0.000000224 0.000002695 0700 - 1900 West Portion

Location and Details of Worksites for Fugitive Dust Assessment - Central Portion (CKR assoicated)

Tier 1 short-term (1-hour & 24-hour) assessment - Mitigated

X1 Y1 X2 Y2

(m) (m) (m) (m) (m) (deg / m) Working HoursNon-working

HoursWorking Hours

Non-working

Hours

Working Hours

[1]

Non-working

Hours [2]

Central Portion At-grade construction M-01 Area 836708 819440 28 73 0.5 40 0.000019878 0.000000224 0.000002695 0700 - 1900

Central Portion At-grade construction M-02 Area 836730 819454 22 47 0.5 40 0.000019878 0.000000224 0.000002695 0700 - 1900

Central Portion At-grade construction M-03 Area 836718 819328 111 25 0.5 37 0.000019878 0.000000224 0.000002695 0700 - 1900

Central Portion At-grade construction M-04 Area 836734 819307 71 27 0.5 37 0.000019878 0.000000224 0.000002695 0700 - 1900

Note:

[1] Emission factor extracted from "Calculation of Emission Factor for Wind Erosion (West, Central and East Portions) - For 1-hour and 24-hour Emissions - Mitigated (Working Hours)".

[2] Emission factor extracted from "Calculation of Emission Factor for Wind Erosion (West, Central and East Portions) - For 1-hour and 24-hour Emissions - Unmitigated (Non-working Hours and Working Hours)".

Long-term (annual) assessment - Mitigated

X1 Y1 X2 Y2

(m) (m) (m) (m) (m) (deg / m) Working HoursNon-working

HoursWorking Hours

Non-working

Hours

Working Hours

[3]

Non-working

Hours [4]

Central Portion At-grade construction M-01 Area 836708 819440 28 73 0.5 40 0.000001193 0.000000013 0.000000162 0700 - 1900

Central Portion At-grade construction M-02 Area 836730 819454 22 47 0.5 40 0.000001193 0.000000013 0.000000162 0700 - 1900

Central Portion At-grade construction M-03 Area 836718 819328 111 25 0.5 37 0.000001193 0.000000013 0.000000162 0700 - 1900

Central Portion At-grade construction M-04 Area 836734 819307 71 27 0.5 37 0.000001193 0.000000013 0.000000162 0700 - 1900

Note:

[3] Emission factor extracted from "Calculation of Emission Factor for Wind Erosion (West, Central and East Portions) - For Annual Emissions - Mitigated (Working Hours)".

[4] Emission factor extracted from "Calculation of Emission Factor for Wind Erosion (West, Central and East Portions) - For Annual Emissions - Unmitigated (Non-working Hours and Working Hours)".

Tier 1 short-term (1-hour & 24-hour) assessment - Unmitigated

X1 Y1 X2 Y2

(m) (m) (m) (m) (m) (deg / m) Working HoursNon-working

HoursWorking Hours

Non-working

Hours

Working Hours

[5]

Non-working

Hours [5]

Central Portion At-grade construction M-01 Area 836708 819440 28 73 0.5 40 0.000239494 0.000002695 0.000002695 0700 - 1900

Central Portion At-grade construction M-02 Area 836730 819454 22 47 0.5 40 0.000239494 0.000002695 0.000002695 0700 - 1900

Central Portion At-grade construction M-03 Area 836718 819328 111 25 0.5 37 0.000239494 0.000002695 0.000002695 0700 - 1900

Central Portion At-grade construction M-04 Area 836734 819307 71 27 0.5 37 0.000239494 0.000002695 0.000002695 0700 - 1900

Note:

[5] Emission factor extracted from "Calculation of Emission Factor for Wind Erosion (West, Central and East Portions) - For 1-hour and 24-hour Emissions - Unmitigated (Non-working Hours and Working Hours)".

Long-term (annual) assessment - Unmitigated

X1 Y1 X2 Y2

(m) (m) (m) (m) (m) (deg / m) Working HoursNon-working

HoursWorking Hours

Non-working

Hours

Working Hours

[6]

Non-working

Hours [6]

Central Portion At-grade construction M-01 Area 836708 819440 28 73 0.5 40 0.000014370 0.000000162 0.000000162 0700 - 1900

Central Portion At-grade construction M-02 Area 836730 819454 22 47 0.5 40 0.000014370 0.000000162 0.000000162 0700 - 1900

Central Portion At-grade construction M-03 Area 836718 819328 111 25 0.5 37 0.000014370 0.000000162 0.000000162 0700 - 1900

Central Portion At-grade construction M-04 Area 836734 819307 71 27 0.5 37 0.000014370 0.000000162 0.000000162 0700 - 1900

Note:

[6] Emission factor extracted from "Calculation of Emission Factor for Wind Erosion (West, Central and East Portions) - For Annual Emissions - Unmitigated (Non-working Hours and Working Hours)".

Location Sources/ Activities Source IDSource

Type

Coordinates of centroid Dimension (m)

HeightAngle /

Width

Emission Rate (g/s/sq.m)

Working HourHeavy Construction Stockpiling Wind Erosion

Dimension (m)

HeightAngle /

Width

Emission Rate (g/s/sq.m)

Working HourHeavy Construction Stockpiling Wind Erosion

Location Sources/ Activities Source IDSource

Type

Coordinates of centroid

Location Sources/ Activities Source IDSource

Type

Coordinates of centroid Dimension (m)

HeightAngle /

Width

Emission Rate (g/s/sq.m)

Working HourHeavy Construction Stockpiling Wind Erosion

Dimension (m)

HeightAngle /

Width

Emission Rate (g/s/sq.m)

Working HourHeavy Construction Stockpiling Wind Erosion

Location Sources/ Activities Source IDSource

Type

Coordinates of centroid

G:\env\project\217722-70\12 Reports Deliverables\11 EIA Report\06 Final Submission\Chapter 4\Appendices\Appendix 4.1b - Dust info_rev2.xlsx Page 8 of 19

Page 15: Appendix 4 - Environmental Protection Department...West Portion At-grade construction W-08 Area 835121 819227 172 16 0.5 11 0.000019878 0.000000224 0.000002695 0700 - 1900 West Portion

Location and Details of Worksites for Fugitive Dust Assessment - East Portion (CKR assoicated)

Tier 1 short-term (1-hour & 24-hour) assessment - Mitigated

X1 Y1 X2 Y2

(m) (m) (m) (m) (m) (deg / m) Working HoursNon-working

HoursWorking Hours

Non-working

Hours

Working Hours

[1]

Non-working

Hours [2]

East Portion Tunnel Construction E-01 Area 838456 820167 255 86 0.5 59 0.000019878 0.000000224 0.000002695 0700 - 1900

East Portion Tunnel Construction E-02 Area 838558 820308 99 100 0.5 40 0.000019878 0.000000224 0.000002695 0700 - 1900

East Portion At-grade construction E-03 Area 838707 820392 175 70 0.5 17 0.000019878 0.000000224 0.000002695 0700 - 1900

East Portion At-grade construction E-04 Area 838850 820399 50 112 0.5 83 0.000019878 0.000000224 0.000002695 0700 - 1900

East Portion At-grade construction E-05 Area 838836 820447 100 40 0.5 0 0.000019878 0.000000224 0.000002695 0700 - 1900

East Portion At-grade construction E-06 Area 838908 820529 130 27 0.5 66 0.000019878 0.000000224 0.000002695 0700 - 1900

East Portion At-grade construction E-08 Area 838967 820624 91 30 0.5 40 0.000019878 0.000000224 0.000002695 0700 - 1900

East Portion At-grade construction E-09 Area 838876 820707 34 74 0.5 30 0.000019878 0.000000224 0.000002695 0700 - 1900

East Portion At-grade construction E-10 Area 838900 820645 28 54 0.5 5 0.000019878 0.000000224 0.000002695 0700 - 1900

East Portion At-grade construction E-11 Area 838877 820537 158 37 0.5 66 0.000019878 0.000000224 0.000002695 0700 - 1900

East Portion At-grade construction E-12 Area 838945 820424 75 18 0.5 10 0.000019878 0.000000224 0.000002695 0700 - 1900

East Portion Adminstration Buidling E-13 Area 838737 820469 45 50 0.5 0 0.000019878 0.000000224 0.000002695 0700 - 1900

East Portion At-grade construction E-14 Area 838735 820506 10 102 0.5 81 0.000019878 0.000000224 0.000002695 0700 - 1900

East Portion At-grade construction E-15 Area 838651 820525 22 68 0.5 86 0.000019878 0.000000224 0.000002695 0700 - 1900

East Portion Ventilation Building E-16 Area 838673 820486 65 36 0.5 0 0.000019878 0.000000224 0.000002695 0700 - 1900

East Portion At-grade construction E-17 Area 838624 820459 10 112 0.5 0 0.000019878 0.000000224 0.000002695 0700 - 1900

East Portion At-grade construction E-18 Area 838668 820437 79 40 0.5 17 0.000019878 0.000000224 0.000002695 0700 - 1900

East Portion At-grade construction E-19 Area 838659 820309 80 60 0.5 16 0.000019878 0.000000224 0.000002695 0700 - 1900

East Portion At-grade construction E-22 Area 838976 820329 37 175 0.5 48 0.000019878 0.000000224 0.000002695 0700 - 1900

East Portion At-grade construction E-23 Area 838988 820400 95 18 0.5 73 0.000019878 0.000000224 0.000002695 0700 - 1900

East Portion At-grade construction E-24 Area 839057 820382 29 314 0.5 47 0.000019878 0.000000224 0.000002695 0700 - 1900

East Portion At-grade construction E-25 Area 839149 820149 44 324 0.5 43 0.000019878 0.000000224 0.000002695 0700 - 1900

East Portion At-grade construction E-30 Area 839347 819978 18 198 0.5 46 0.000019878 0.000000224 0.000002695 0700 - 1900

East Portion At-grade construction E-31 Area 839441 819891 18 58 0.5 55 0.000019878 0.000000224 0.000002695 0700 - 1900

East Portion At-grade construction E-32 Area 839476 819846 20 57 0.5 10 0.000019878 0.000000224 0.000002695 0700 - 1900

East Portion At-grade construction E-33 Area 838710 820468 9 74 0.5 0 0.000019878 0.000000224 0.000002695 0700 - 1900

East Portion Tunnel Construction E-34 Area 838121 819922 139 90 0.5 2 0.000019878 0.000000224 0.000002695 0700 - 1900

East Portion Tunnel Construction E-35 Area 838257 819952 139 90 0.5 27 0.000019878 0.000000224 0.000002695 0700 - 1900

East Portion Tunnel Construction E-36 Area 838351 820026 98 90 0.5 40 0.000019878 0.000000224 0.000002695 0700 - 1900

East Portion Tunnel Construction E-37 Area 837979 819870 25 100 0.5 49 0.000019878 0.000000224 0.000002695 0700 - 1900

East Portion Tunnel Construction E-38 Area 837955 819951 50 25 0.5 70 0.000019878 0.000000224 0.000002695 0700 - 1900

East Portion Tunnel Construction E-39 Area 837988 819946 60 40 0.5 70 0.000019878 0.000000224 0.000002695 0700 - 1900

East Portion Tunnel Construction E-40 Area 838025 819931 60 40 0.5 70 0.000019878 0.000000224 0.000002695 0700 - 1900

East Portion Stockpile E-SP02 Area 838591 820107 95 55 0.5 49 0.000010015 0.000000224 0.000002695 0700 - 1900

Note:

[1] Emission factor extracted from "Calculation of Emission Factor for Wind Erosion (West, Central and East Portions) - For 1-hour and 24-hour Emissions - Mitigated (Working Hours)".

[2] Emission factor extracted from "Calculation of Emission Factor for Wind Erosion (West, Central and East Portions) - For 1-hour and 24-hour Emissions - Unmitigated (Non-working Hours and Working Hours)".

HeightAngle /

Width

Emission Rate (g/s/sq.m)

Working HourHeavy Construction Stockpiling Wind Erosion

Dimension (m)

Location Sources/ Activities Source IDSource

Type

Coordinates of centroid

G:\env\project\217722-70\12 Reports Deliverables\11 EIA Report\06 Final Submission\Chapter 4\Appendices\Appendix 4.1b - Dust info_rev2.xlsx Page 9 of 19

Page 16: Appendix 4 - Environmental Protection Department...West Portion At-grade construction W-08 Area 835121 819227 172 16 0.5 11 0.000019878 0.000000224 0.000002695 0700 - 1900 West Portion

Location and Details of Worksites for Fugitive Dust Assessment - East Portion (CKR assoicated)

Long-term (annual) assessment - Mitigated

X1 Y1 X2 Y2

(m) (m) (m) (m) (m) (deg / m) Working HoursNon-working

HoursWorking Hours

Non-working

Hours

Working Hours

[1]

Non-working

Hours [2]

East Portion Tunnel Construction E-01 Area 838456 820167 255 86 0.5 59 0.000001193 0.000000013 0.000000162 0700 - 1900

East Portion Tunnel Construction E-02 Area 838558 820308 99 100 0.5 40 0.000001193 0.000000013 0.000000162 0700 - 1900

East Portion At-grade construction E-03 Area 838707 820392 175 70 0.5 17 0.000001193 0.000000013 0.000000162 0700 - 1900

East Portion At-grade construction E-04 Area 838850 820399 50 112 0.5 83 0.000001193 0.000000013 0.000000162 0700 - 1900

East Portion At-grade construction E-05 Area 838836 820447 100 40 0.5 0 0.000001193 0.000000013 0.000000162 0700 - 1900

East Portion At-grade construction E-06 Area 838908 820529 130 27 0.5 66 0.000001193 0.000000013 0.000000162 0700 - 1900

East Portion At-grade construction E-08 Area 838967 820624 91 30 0.5 40 0.000001193 0.000000013 0.000000162 0700 - 1900

East Portion At-grade construction E-09 Area 838876 820707 34 74 0.5 30 0.000001193 0.000000013 0.000000162 0700 - 1900

East Portion At-grade construction E-10 Area 838900 820645 28 54 0.5 5 0.000001193 0.000000013 0.000000162 0700 - 1900

East Portion At-grade construction E-11 Area 838877 820537 158 37 0.5 66 0.000001193 0.000000013 0.000000162 0700 - 1900

East Portion At-grade construction E-12 Area 838945 820424 75 18 0.5 10 0.000001193 0.000000013 0.000000162 0700 - 1900

East Portion Adminstration Buidling E-13 Area 838737 820469 45 50 0.5 0 0.000001193 0.000000013 0.000000162 0700 - 1900

East Portion At-grade construction E-14 Area 838735 820506 10 102 0.5 81 0.000001193 0.000000013 0.000000162 0700 - 1900

East Portion At-grade construction E-15 Area 838651 820525 22 68 0.5 86 0.000001193 0.000000013 0.000000162 0700 - 1900

East Portion Ventilation Building E-16 Area 838673 820486 65 36 0.5 0 0.000001193 0.000000013 0.000000162 0700 - 1900

East Portion At-grade construction E-17 Area 838624 820459 10 112 0.5 0 0.000001193 0.000000013 0.000000162 0700 - 1900

East Portion At-grade construction E-18 Area 838668 820437 79 40 0.5 17 0.000001193 0.000000013 0.000000162 0700 - 1900

East Portion At-grade construction E-19 Area 838659 820309 80 60 0.5 16 0.000001193 0.000000013 0.000000162 0700 - 1900

East Portion At-grade construction E-22 Area 838976 820329 37 175 0.5 48 0.000001193 0.000000013 0.000000162 0700 - 1900

East Portion At-grade construction E-23 Area 838988 820400 95 18 0.5 73 0.000001193 0.000000013 0.000000162 0700 - 1900

East Portion At-grade construction E-24 Area 839057 820382 29 314 0.5 47 0.000001193 0.000000013 0.000000162 0700 - 1900

East Portion At-grade construction E-25 Area 839149 820149 44 324 0.5 43 0.000001193 0.000000013 0.000000162 0700 - 1900

East Portion At-grade construction E-30 Area 839347 819978 18 198 0.5 46 0.000001193 0.000000013 0.000000162 0700 - 1900

East Portion At-grade construction E-31 Area 839441 819891 18 58 0.5 55 0.000001193 0.000000013 0.000000162 0700 - 1900

East Portion At-grade construction E-32 Area 839476 819846 20 57 0.5 10 0.000001193 0.000000013 0.000000162 0700 - 1900

East Portion At-grade construction E-33 Area 838710 820468 9 74 0.5 0 0.000001193 0.000000013 0.000000162 0700 - 1900

East Portion Tunnel Construction E-34 Area 838121 819922 139 90 0.5 2 0.000001193 0.000000013 0.000000162 0700 - 1900

East Portion Tunnel Construction E-35 Area 838257 819952 139 90 0.5 27 0.000001193 0.000000013 0.000000162 0700 - 1900

East Portion Tunnel Construction E-36 Area 838351 820026 98 90 0.5 40 0.000001193 0.000000013 0.000000162 0700 - 1900

East Portion Tunnel Construction E-37 Area 837979 819870 25 100 0.5 49 0.000001193 0.000000013 0.000000162 0700 - 1900

East Portion Tunnel Construction E-38 Area 837955 819951 50 25 0.5 70 0.000001193 0.000000013 0.000000162 0700 - 1900

East Portion Tunnel Construction E-39 Area 837988 819946 60 40 0.5 70 0.000001193 0.000000013 0.000000162 0700 - 1900

East Portion Tunnel Construction E-40 Area 838025 819931 60 40 0.5 70 0.000001193 0.000000013 0.000000162 0700 - 1900

East Portion Stockpile E-SP02 Area 838591 820107 95 55 0.5 49 0.000010015 0.000000224 0.000002695 0700 - 1900

Note:

[1] Emission factor extracted from "Calculation of Emission Factor for Wind Erosion (West, Central and East Portions) - For Annual Emissions - Mitigated (Working Hours)".

[2] Emission factor extracted from "Calculation of Emission Factor for Wind Erosion (West, Central and East Portions) - For Annual Emissions - Unmitigated (Non-working Hours and Working Hours)".

Location Sources/ Activities Source IDSource

Type

Coordinates of centroid Dimension (m)Height

Angle /

Width

Emission Rate (g/s/sq.m)

Working HourHeavy Construction Stockpiling Wind Erosion

G:\env\project\217722-70\12 Reports Deliverables\11 EIA Report\06 Final Submission\Chapter 4\Appendices\Appendix 4.1b - Dust info_rev2.xlsx Page 10 of 19

Page 17: Appendix 4 - Environmental Protection Department...West Portion At-grade construction W-08 Area 835121 819227 172 16 0.5 11 0.000019878 0.000000224 0.000002695 0700 - 1900 West Portion

Location and Details of Worksites for Fugitive Dust Assessment - East Portion (CKR assoicated)

Tier 2 short-term (1-hour & 24-hour) assessment - near E-A8 Wei Chien Court and E-A14 Wyler Gardens (Mitigated)

X1 Y1 X2 Y2

(m) (m) (m) (m) (m) (deg / m) Working HoursNon-working

HoursWorking Hours

Non-working

Hours

Working Hours

[1]

Non-working

Hours [2]

East Portion Tunnel Construction E-01 Area 838456 820167 255 86 0.5 59 0.000019878 0.000000224 0.000002695 0700 - 1900

East Portion Tunnel Construction E-02 Area 838558 820308 99 100 0.5 40 0.000019878 0.000000224 0.000002695 0700 - 1900

East Portion At-grade construction E-03 Area 838707 820392 175 70 0.5 17 0.000019878 0.000000224 0.000002695 0700 - 1900

East Portion At-grade construction E-04 Area 838850 820399 50 112 0.5 83 0.000019878 0.000000224 0.000002695 0700 - 1900

East Portion At-grade construction E-05 Area 838836 820447 100 40 0.5 0 0.000019878 0.000000224 0.000002695 0700 - 1900

East Portion At-grade construction E-06 Area 838908 820529 130 27 0.5 66 0.000019878 0.000000224 0.000002695 0700 - 1900

East Portion At-grade construction E-08 Area 838967 820624 91 30 0.5 40 0.000019878 0.000000224 0.000002695 0700 - 1900

East Portion At-grade construction E-09 Area 838876 820707 34 74 0.5 30 0.000019878 0.000000224 0.000002695 0700 - 1900

East Portion At-grade construction E-10 Area 838900 820645 28 54 0.5 5 0.000019878 0.000000224 0.000002695 0700 - 1900

East Portion At-grade construction E-11 Area 838877 820537 158 37 0.5 66 0.000019878 0.000000224 0.000002695 0700 - 1900

East Portion At-grade construction E-12 Area 838945 820424 75 18 0.5 10 0.000019878 0.000000224 0.000002695 0700 - 1900

East Portion Adminstration Buidling E-13 Area 838737 820469 45 50 0.5 0 0.000019878 0.000000224 0.000002695 0700 - 1900

East Portion At-grade construction E-14 Area 838735 820506 10 102 0.5 81 0.000019878 0.000000224 0.000002695 0700 - 1900

East Portion At-grade construction E-15 Area 838651 820525 22 68 0.5 86 0.000019878 0.000000224 0.000002695 0700 - 1900

East Portion Ventilation Building E-16 Area 838673 820486 65 36 0.5 0 0.000019878 0.000000224 0.000002695 0700 - 1900

East Portion At-grade construction E-17 Area 838624 820459 10 112 0.5 0 0.000019878 0.000000224 0.000002695 0700 - 1900

East Portion At-grade construction E-18 Area 838668 820437 79 40 0.5 17 0.000019878 0.000000224 0.000002695 0700 - 1900

East Portion At-grade construction E-19 Area 838659 820309 80 60 0.5 16 0.000019878 0.000000224 0.000002695 0700 - 1900

East Portion At-grade construction E-22 Area 838976 820329 37 175 0.5 48 0.000019878 0.000000224 0.000002695 0700 - 1900

East Portion At-grade construction E-23 Area 838988 820400 95 18 0.5 73 0.000019878 0.000000224 0.000002695 0700 - 1900

East Portion At-grade construction E-24 Area 839057 820382 29 314 0.5 47 0.000019878 0.000000224 0.000002695 0700 - 1900

East Portion At-grade construction E-25 Area 839149 820149 44 324 0.5 43 0.000019878 0.000000224 0.000002695 0700 - 1900

East Portion At-grade construction E-30 Area 839347 819978 18 198 0.5 46 0.000019878 0.000000224 0.000002695 0700 - 1900

East Portion At-grade construction E-31 Area 839441 819891 18 58 0.5 55 0.000019878 0.000000224 0.000002695 0700 - 1900

East Portion At-grade construction E-32 Area 839476 819846 20 57 0.5 10 0.000019878 0.000000224 0.000002695 0700 - 1900

East Portion At-grade construction E-33 Area 838710 820468 9 74 0.5 0 0.000019878 0.000000224 0.000002695 0700 - 1900

East Portion Tunnel Construction E-37 Area 837979 819870 25 100 0.5 49 0.000019878 0.000000224 0.000002695 0700 - 1900

East Portion Tunnel Construction E-38 Area 837955 819951 50 25 0.5 70 0.000019878 0.000000224 0.000002695 0700 - 1900

East Portion Tunnel Construction E-39 Area 837983 819933 33 40 0.5 70 0.000019878 0.000000224 0.000002695 0700 - 1900

East Portion Tunnel Construction E-40 Area 838021 819918 33 40 0.5 70 0.000019878 0.000000224 0.000002695 0700 - 1900

East Portion Stockpile E-SP02 Area 838591 820107 95 55 0.5 49 0.000010015 0.000000224 0.000002695 0700 - 1900

Note:

[1] Emission factor extracted from "Calculation of Emission Factor for Wind Erosion (West, Central and East Portions) - For 1-hour and 24-hour Emissions - Mitigated (Working Hours)".

[2] Emission factor extracted from "Calculation of Emission Factor for Wind Erosion (West, Central and East Portions) - For 1-hour and 24-hour Emissions - Unmitigated (Non-working Hours and Working Hours)".

Working HourHeavy Construction Stockpiling Wind Erosion

Location Sources/ Activities Source IDSource

Type

Coordinates of centroid Dimension (m)Height

Angle /

Width

Emission Rate (g/s/sq.m)

G:\env\project\217722-70\12 Reports Deliverables\11 EIA Report\06 Final Submission\Chapter 4\Appendices\Appendix 4.1b - Dust info_rev2.xlsx Page 11 of 19

Page 18: Appendix 4 - Environmental Protection Department...West Portion At-grade construction W-08 Area 835121 819227 172 16 0.5 11 0.000019878 0.000000224 0.000002695 0700 - 1900 West Portion

Location and Details of Worksites for Fugitive Dust Assessment - East Portion (CKR assoicated)

Tier 2 short-term (1-hour & 24-hour) assessment - near E-A1 Hong Kong International Trade and Exhibition Centre (Mitigated)

X1 Y1 X2 Y2

(m) (m) (m) (m) (m) (deg / m) Working HoursNon-working

HoursWorking Hours

Non-working

Hours

Working Hours

[1]

Non-working

Hours [2]

East Portion Tunnel Construction E-01 Area 838456 820167 255 86 0.5 59 0.000019878 0.000000224 0.000002695 0700 - 1900

East Portion Tunnel Construction E-02 Area 838558 820308 99 100 0.5 40 0.000019878 0.000000224 0.000002695 0700 - 1900

East Portion At-grade construction E-03 Area 838707 820392 175 70 0.5 17 0.000019878 0.000000224 0.000002695 0700 - 1900

East Portion At-grade construction E-04 Area 838850 820399 50 112 0.5 83 0.000019878 0.000000224 0.000002695 0700 - 1900

East Portion At-grade construction E-05 Area 838836 820447 100 40 0.5 0 0.000019878 0.000000224 0.000002695 0700 - 1900

East Portion At-grade construction E-06 Area 838920 820557 67 27 0.5 66 0.000019878 0.000000224 0.000002695 0700 - 1900

East Portion At-grade construction E-09 Area 838876 820707 34 74 0.5 30 0.000019878 0.000000224 0.000002695 0700 - 1900

East Portion At-grade construction E-10 Area 838900 820645 28 54 0.5 5 0.000019878 0.000000224 0.000002695 0700 - 1900

East Portion At-grade construction E-12 Area 838945 820424 75 18 0.5 10 0.000019878 0.000000224 0.000002695 0700 - 1900

East Portion Adminstration Buidling E-13 Area 838737 820469 45 50 0.5 0 0.000019878 0.000000224 0.000002695 0700 - 1900

East Portion At-grade construction E-14 Area 838735 820506 10 102 0.5 81 0.000019878 0.000000224 0.000002695 0700 - 1900

East Portion At-grade construction E-15 Area 838651 820525 22 68 0.5 86 0.000019878 0.000000224 0.000002695 0700 - 1900

East Portion Ventilation Building E-16 Area 838673 820486 65 36 0.5 0 0.000019878 0.000000224 0.000002695 0700 - 1900

East Portion At-grade construction E-17 Area 838624 820459 10 112 0.5 0 0.000019878 0.000000224 0.000002695 0700 - 1900

East Portion At-grade construction E-18 Area 838668 820437 79 40 0.5 17 0.000019878 0.000000224 0.000002695 0700 - 1900

East Portion At-grade construction E-19 Area 838659 820309 80 60 0.5 16 0.000019878 0.000000224 0.000002695 0700 - 1900

East Portion At-grade construction E-22 Area 838976 820329 37 175 0.5 48 0.000019878 0.000000224 0.000002695 0700 - 1900

East Portion At-grade construction E-23 Area 838988 820400 95 18 0.5 73 0.000019878 0.000000224 0.000002695 0700 - 1900

East Portion At-grade construction E-24 Area 839057 820382 29 314 0.5 47 0.000019878 0.000000224 0.000002695 0700 - 1900

East Portion At-grade construction E-25 Area 839149 820149 44 324 0.5 43 0.000019878 0.000000224 0.000002695 0700 - 1900

East Portion At-grade construction E-30 Area 839347 819978 18 198 0.5 46 0.000019878 0.000000224 0.000002695 0700 - 1900

East Portion At-grade construction E-31 Area 839441 819891 18 58 0.5 55 0.000019878 0.000000224 0.000002695 0700 - 1900

East Portion At-grade construction E-32 Area 839476 819846 20 57 0.5 10 0.000019878 0.000000224 0.000002695 0700 - 1900

East Portion At-grade construction E-33 Area 838710 820468 9 74 0.5 0 0.000019878 0.000000224 0.000002695 0700 - 1900

East Portion Tunnel Construction E-34 Area 838121 819922 139 90 0.5 2 0.000019878 0.000000224 0.000002695 0700 - 1900

East Portion Tunnel Construction E-35 Area 838257 819952 139 90 0.5 27 0.000019878 0.000000224 0.000002695 0700 - 1900

East Portion Tunnel Construction E-36 Area 838351 820026 98 90 0.5 40 0.000019878 0.000000224 0.000002695 0700 - 1900

East Portion Tunnel Construction E-37 Area 837979 819870 25 100 0.5 49 0.000019878 0.000000224 0.000002695 0700 - 1900

East Portion Tunnel Construction E-38 Area 837955 819951 50 25 0.5 70 0.000019878 0.000000224 0.000002695 0700 - 1900

East Portion Tunnel Construction E-39 Area 837988 819946 60 40 0.5 70 0.000019878 0.000000224 0.000002695 0700 - 1900

East Portion Tunnel Construction E-40 Area 838025 819931 60 40 0.5 70 0.000019878 0.000000224 0.000002695 0700 - 1900

East Portion Stockpile E-SP02 Area 838591 820107 95 55 0.5 49 0.000010015 0.000000224 0.000002695 0700 - 1900

Note:

[1] Emission factor extracted from "Calculation of Emission Factor for Wind Erosion (West, Central and East Portions) - For 1-hour and 24-hour Emissions - Mitigated (Working Hours)".

[2] Emission factor extracted from "Calculation of Emission Factor for Wind Erosion (West, Central and East Portions) - For 1-hour and 24-hour Emissions - Unmitigated (Non-working Hours and Working Hours)".

Wind ErosionLocation Sources/ Activities Source ID

Source

Type

Coordinates of centroid

Working HourHeavy Construction Stockpiling

Dimension (m)Height

Angle /

Width

Emission Rate (g/s/sq.m)

G:\env\project\217722-70\12 Reports Deliverables\11 EIA Report\06 Final Submission\Chapter 4\Appendices\Appendix 4.1b - Dust info_rev2.xlsx Page 12 of 19

Page 19: Appendix 4 - Environmental Protection Department...West Portion At-grade construction W-08 Area 835121 819227 172 16 0.5 11 0.000019878 0.000000224 0.000002695 0700 - 1900 West Portion

Location and Details of Worksites for Fugitive Dust Assessment - East Portion (CKR assoicated)

Tier 1 short-term (1-hour & 24-hour) assessment - Unmitigated

X1 Y1 X2 Y2

(m) (m) (m) (m) (m) (deg / m) Working HoursNon-working

HoursWorking Hours

Non-working

Hours

Working Hours

[1]

Non-working

Hours [1]

East Portion Tunnel Construction E-01 Area 838456 820167 255 86 0.5 59 0.000239494 0.000002695 0.000002695 0700 - 1900

East Portion Tunnel Construction E-02 Area 838558 820308 99 100 0.5 40 0.000239494 0.000002695 0.000002695 0700 - 1900

East Portion At-grade construction E-03 Area 838707 820392 175 70 0.5 17 0.000239494 0.000002695 0.000002695 0700 - 1900

East Portion At-grade construction E-04 Area 838850 820399 50 112 0.5 83 0.000239494 0.000002695 0.000002695 0700 - 1900

East Portion At-grade construction E-05 Area 838836 820447 100 40 0.5 0 0.000239494 0.000002695 0.000002695 0700 - 1900

East Portion At-grade construction E-06 Area 838908 820529 130 27 0.5 66 0.000239494 0.000002695 0.000002695 0700 - 1900

East Portion At-grade construction E-08 Area 838967 820624 91 30 0.5 40 0.000239494 0.000002695 0.000002695 0700 - 1900

East Portion At-grade construction E-09 Area 838876 820707 34 74 0.5 30 0.000239494 0.000002695 0.000002695 0700 - 1900

East Portion At-grade construction E-10 Area 838900 820645 28 54 0.5 5 0.000239494 0.000002695 0.000002695 0700 - 1900

East Portion At-grade construction E-11 Area 838877 820537 158 37 0.5 66 0.000239494 0.000002695 0.000002695 0700 - 1900

East Portion At-grade construction E-12 Area 838945 820424 75 18 0.5 10 0.000239494 0.000002695 0.000002695 0700 - 1900

East Portion Adminstration Buidling E-13 Area 838737 820469 45 50 0.5 0 0.000239494 0.000002695 0.000002695 0700 - 1900

East Portion At-grade construction E-14 Area 838735 820506 10 102 0.5 81 0.000239494 0.000002695 0.000002695 0700 - 1900

East Portion At-grade construction E-15 Area 838651 820525 22 68 0.5 86 0.000239494 0.000002695 0.000002695 0700 - 1900

East Portion Ventilation Building E-16 Area 838673 820486 65 36 0.5 0 0.000239494 0.000002695 0.000002695 0700 - 1900

East Portion At-grade construction E-17 Area 838624 820459 10 112 0.5 0 0.000239494 0.000002695 0.000002695 0700 - 1900

East Portion At-grade construction E-18 Area 838668 820437 79 40 0.5 17 0.000239494 0.000002695 0.000002695 0700 - 1900

East Portion At-grade construction E-19 Area 838659 820309 80 60 0.5 16 0.000239494 0.000002695 0.000002695 0700 - 1900

East Portion At-grade construction E-22 Area 838976 820329 37 175 0.5 48 0.000239494 0.000002695 0.000002695 0700 - 1900

East Portion At-grade construction E-23 Area 838988 820400 95 18 0.5 73 0.000239494 0.000002695 0.000002695 0700 - 1900

East Portion At-grade construction E-24 Area 839057 820382 29 314 0.5 47 0.000239494 0.000002695 0.000002695 0700 - 1900

East Portion At-grade construction E-25 Area 839149 820149 44 324 0.5 43 0.000239494 0.000002695 0.000002695 0700 - 1900

East Portion At-grade construction E-30 Area 839347 819978 18 198 0.5 46 0.000239494 0.000002695 0.000002695 0700 - 1900

East Portion At-grade construction E-31 Area 839441 819891 18 58 0.5 55 0.000239494 0.000002695 0.000002695 0700 - 1900

East Portion At-grade construction E-32 Area 839476 819846 20 57 0.5 10 0.000239494 0.000002695 0.000002695 0700 - 1900

East Portion At-grade construction E-33 Area 838710 820468 9 74 0.5 0 0.000239494 0.000002695 0.000002695 0700 - 1900

East Portion Tunnel Construction E-34 Area 838121 819922 139 90 0.5 2 0.000239494 0.000002695 0.000002695 0700 - 1900

East Portion Tunnel Construction E-35 Area 838257 819952 139 90 0.5 27 0.000239494 0.000002695 0.000002695 0700 - 1900

East Portion Tunnel Construction E-36 Area 838351 820026 98 90 0.5 40 0.000239494 0.000002695 0.000002695 0700 - 1900

East Portion Tunnel Construction E-37 Area 837979 819870 25 100 0.5 49 0.000239494 0.000002695 0.000002695 0700 - 1900

East Portion Tunnel Construction E-38 Area 837955 819951 50 25 0.5 70 0.000239494 0.000002695 0.000002695 0700 - 1900

East Portion Tunnel Construction E-39 Area 837988 819946 60 40 0.5 70 0.000239494 0.000002695 0.000002695 0700 - 1900

East Portion Tunnel Construction E-40 Area 838025 819931 60 40 0.5 70 0.000239494 0.000002695 0.000002695 0700 - 1900

East Portion Stockpile E-SP02 Area 838591 820107 95 55 0.5 49 0.000020029 0.000000224 0.000002695 0700 - 1900

Note:

[1] Emission factor extracted from "Calculation of Emission Factor for Wind Erosion (West, Central and East Portions) - For 1-hour and 24-hour Emissions - Unmitigated (Non-working Hours and Working Hours)".

HeightAngle /

Width

Emission Rate (g/s/sq.m)

Working HourHeavy Construction Stockpiling Wind Erosion

Dimension (m)

Location Sources/ Activities Source IDSource

Type

Coordinates of centroid

G:\env\project\217722-70\12 Reports Deliverables\11 EIA Report\06 Final Submission\Chapter 4\Appendices\Appendix 4.1b - Dust info_rev2.xlsx Page 13 of 19

Page 20: Appendix 4 - Environmental Protection Department...West Portion At-grade construction W-08 Area 835121 819227 172 16 0.5 11 0.000019878 0.000000224 0.000002695 0700 - 1900 West Portion

Location and Details of Worksites for Fugitive Dust Assessment - East Portion (CKR assoicated)

Long-term (annual) assessment - Unmitigated

X1 Y1 X2 Y2

(m) (m) (m) (m) (m) (deg / m) Working HoursNon-working

HoursWorking Hours

Non-working

Hours

Working Hours

[1]

Non-working

Hours [1]

East Portion Tunnel Construction E-01 Area 838456 820167 255 86 0.5 59 0.000014370 0.000000162 0.000000162 0700 - 1900

East Portion Tunnel Construction E-02 Area 838558 820308 99 100 0.5 40 0.000014370 0.000000162 0.000000162 0700 - 1900

East Portion At-grade construction E-03 Area 838707 820392 175 70 0.5 17 0.000014370 0.000000162 0.000000162 0700 - 1900

East Portion At-grade construction E-04 Area 838850 820399 50 112 0.5 83 0.000014370 0.000000162 0.000000162 0700 - 1900

East Portion At-grade construction E-05 Area 838836 820447 100 40 0.5 0 0.000014370 0.000000162 0.000000162 0700 - 1900

East Portion At-grade construction E-06 Area 838908 820529 130 27 0.5 66 0.000014370 0.000000162 0.000000162 0700 - 1900

East Portion At-grade construction E-08 Area 838967 820624 91 30 0.5 40 0.000014370 0.000000162 0.000000162 0700 - 1900

East Portion At-grade construction E-09 Area 838876 820707 34 74 0.5 30 0.000014370 0.000000162 0.000000162 0700 - 1900

East Portion At-grade construction E-10 Area 838900 820645 28 54 0.5 5 0.000014370 0.000000162 0.000000162 0700 - 1900

East Portion At-grade construction E-11 Area 838877 820537 158 37 0.5 66 0.000014370 0.000000162 0.000000162 0700 - 1900

East Portion At-grade construction E-12 Area 838945 820424 75 18 0.5 10 0.000014370 0.000000162 0.000000162 0700 - 1900

East Portion Adminstration Buidling E-13 Area 838737 820469 45 50 0.5 0 0.000014370 0.000000162 0.000000162 0700 - 1900

East Portion At-grade construction E-14 Area 838735 820506 10 102 0.5 81 0.000014370 0.000000162 0.000000162 0700 - 1900

East Portion At-grade construction E-15 Area 838651 820525 22 68 0.5 86 0.000014370 0.000000162 0.000000162 0700 - 1900

East Portion Ventilation Building E-16 Area 838673 820486 65 36 0.5 0 0.000014370 0.000000162 0.000000162 0700 - 1900

East Portion At-grade construction E-17 Area 838624 820459 10 112 0.5 0 0.000014370 0.000000162 0.000000162 0700 - 1900

East Portion At-grade construction E-18 Area 838668 820437 79 40 0.5 17 0.000014370 0.000000162 0.000000162 0700 - 1900

East Portion At-grade construction E-19 Area 838659 820309 80 60 0.5 16 0.000014370 0.000000162 0.000000162 0700 - 1900

East Portion At-grade construction E-22 Area 838976 820329 37 175 0.5 48 0.000014370 0.000000162 0.000000162 0700 - 1900

East Portion At-grade construction E-23 Area 838988 820400 95 18 0.5 73 0.000014370 0.000000162 0.000000162 0700 - 1900

East Portion At-grade construction E-24 Area 839057 820382 29 314 0.5 47 0.000014370 0.000000162 0.000000162 0700 - 1900

East Portion At-grade construction E-25 Area 839149 820149 44 324 0.5 43 0.000014370 0.000000162 0.000000162 0700 - 1900

East Portion At-grade construction E-30 Area 839347 819978 18 198 0.5 46 0.000014370 0.000000162 0.000000162 0700 - 1900

East Portion At-grade construction E-31 Area 839441 819891 18 58 0.5 55 0.000014370 0.000000162 0.000000162 0700 - 1900

East Portion At-grade construction E-32 Area 839476 819846 20 57 0.5 10 0.000014370 0.000000162 0.000000162 0700 - 1900

East Portion At-grade construction E-33 Area 838710 820468 9 74 0.5 0 0.000014370 0.000000162 0.000000162 0700 - 1900

East Portion Tunnel Construction E-34 Area 838121 819922 139 90 0.5 2 0.000014370 0.000000162 0.000000162 0700 - 1900

East Portion Tunnel Construction E-35 Area 838257 819952 139 90 0.5 27 0.000014370 0.000000162 0.000000162 0700 - 1900

East Portion Tunnel Construction E-36 Area 838351 820026 98 90 0.5 40 0.000014370 0.000000162 0.000000162 0700 - 1900

East Portion Tunnel Construction E-37 Area 837979 819870 25 100 0.5 49 0.000014370 0.000000162 0.000000162 0700 - 1900

East Portion Tunnel Construction E-38 Area 837955 819951 50 25 0.5 70 0.000014370 0.000000162 0.000000162 0700 - 1900

East Portion Tunnel Construction E-39 Area 837988 819946 60 40 0.5 70 0.000014370 0.000000162 0.000000162 0700 - 1900

East Portion Tunnel Construction E-40 Area 838025 819931 60 40 0.5 70 0.000014370 0.000000162 0.000000162 0700 - 1900

East Portion Stockpile E-SP02 Area 838591 820107 95 55 0.5 49 0.000020029 0.000000224 0.000002695 0700 - 1900

Note:

[1] Emission factor extracted from "Calculation of Emission Factor for Wind Erosion (West, Central and East Portions) - For Annual Emissions - Unmitigated (Non-working Hours and Working Hours)".

Dimension (m)Height

Angle /

Width

Emission Rate (g/s/sq.m)

Working HourHeavy Construction Stockpiling Wind Erosion

Location Sources/ Activities Source IDSource

Type

Coordinates of centroid

G:\env\project\217722-70\12 Reports Deliverables\11 EIA Report\06 Final Submission\Chapter 4\Appendices\Appendix 4.1b - Dust info_rev2.xlsx Page 14 of 19

Page 21: Appendix 4 - Environmental Protection Department...West Portion At-grade construction W-08 Area 835121 819227 172 16 0.5 11 0.000019878 0.000000224 0.000002695 0700 - 1900 West Portion

Location and Details of Worksites for Fugitive Dust Assessment - East Portion (Concurrent Projects/Sources)

Tier 1 short-term (1-hour & 24-hour) assessment - Mitigated

X1 Y1 X2 Y2

(m) (m) (m) (m) (m) (deg / m) Working HoursNon-working

HoursWorking Hours

Non-working

HoursWorking Hours

Non-working

HoursWorking Hours

Non-working

HoursWorking Hours

Non-working

Hours

KTD Construction of Trunk Road T2 and Local Roads 211 Line 839409 819744 839198 819950 0.0 14 0.000209600 0.000018870 0.000018870 0700 - 1900

KTD Construction of Trunk Road T2 and Local Roads 212 Line 839198 819950 838847 820293 0.0 14 0.000209600 0.000018870 0.000018870 0700 - 1900

KTD Construction of Road L12 & L13 214 Line 839084 819672 839010 819487 0.0 20 0.000299400 0.000026950 0.000026950 0700 - 1900

KTD Construction of Road D3 237 Line 838582 820607 838619 820501 0.0 20 0.000299400 0.000026950 0.000026950 0700 - 1900

KTD Construction of Road D3 238 Line 838619 820501 838598 820209 0.0 20 0.000299400 0.000026950 0.000026950 0700 - 1900

KTD Construction of Road D3 239 Line 838598 820209 838608 820161 0.0 20 0.000299400 0.000026950 0.000026950 0700 - 1900

KTD Construction of Road D3 240 Line 838608 820161 838630 820118 0.0 20 0.000299400 0.000026950 0.000026950 0700 - 1900

KTD Construction of Road D3 241 Line 838630 820118 838665 820080 0.0 20 0.000299400 0.000026950 0.000026950 0700 - 1900

KTD Elevated Landscape Deck above Road D3 303 Line 839088 819697 839408 819386 0.0 40 0.000598700 0.000053910 0.000053910 0700 - 1900

KTD Conversion of TD4 into D4 309 Line 839476 819784 839260 819559 0.0 40 0.000598700 0.000053910 0.000053910 0700 - 1900

KTD Cut & Cover Section of T2 326 Line 839534 819753 839260 820042 0.0 40 0.000598700 0.000053910 0.000053910 0700 - 1900

KTD Construction of Pumping Station PS1A 340 Line 838891 820937 838946 820882 0.0 43 0.000643600 0.000057950 0.000057950 0700 - 1900

KTD Local Roads L4 & L5 354 Line 839035 820932 838829 821133 0.0 18 0.000269400 0.000024260 0.000024260 0700 - 1900

KTD Local Roads L4 & L5 355 Line 838935 821041 838991 821105 0.0 20 0.000299400 0.000026950 0.000026950 0700 - 1900

KTD Local Roads L4 & L5 356 Line 838829 821133 838716 821245 0.0 18 0.000269400 0.000024260 0.000024260 0700 - 1900

KTD Local Roads L4 & L5 357 Line 838815 821133 838710 821025 0.0 20 0.000299400 0.000026950 0.000026950 0700 - 1900

KTD Construction of Road D2, D3, L6, L17 & L19 206 Line 838568 820644 838487 820794 0.0 20 0.000299400 0.000026950 0.000026950 0700 - 1900

KTD Construction of Road D2, D3, L6, L17 & L19 207 Line 838487 820794 838605 820919 0.0 20 0.000299400 0.000026950 0.000026950 0700 - 1900

KTD Construction of Road D2, D3, L6, L17 & L19 218 Line 837858 819750 837930 819706 0.0 10 0.000149700 0.000013480 0.000013480 0700 - 1900

KTD Construction of Road D2, D3, L6, L17 & L19 220 Line 837657 819505 837755 819460 0.0 20 0.000299400 0.000026950 0.000026950 0700 - 1900

KTD Construction of Road D2, D3, L6, L17 & L19 221 Line 837755 819460 837772 819405 0.0 20 0.000299400 0.000026950 0.000026950 0700 - 1900

KTD Construction of Road D2, D3, L6, L17 & L19 222 Line 837772 819405 837735 819359 0.0 20 0.000299400 0.000026950 0.000026950 0700 - 1900

KTD Construction of Road D2, D3, L6, L17 & L19 223 Line 837735 819359 837697 819325 0.0 20 0.000299400 0.000026950 0.000026950 0700 - 1900

KTD Construction of Road D2, D3, L6, L17 & L19 224 Line 837697 819325 837663 819253 0.0 20 0.000299400 0.000026950 0.000026950 0700 - 1900

KTD Pumping Station PS2 243 Line 838568 820717 838609 820662 0.0 50 0.000748400 0.000067380 0.000067380 0700 - 1900

KTD Stadium Complex 291 Line 838288 820767 838292 820619 0.0 106 0.001587000 0.000142900 0.000142900 0700 - 1900

KTD Stadium Complex 292 Line 838366 820499 838367 820202 0.0 220 0.003293000 0.000296500 0.000296500 0700 - 1900

KTD Stadium Complex 293 Line 838033 820544 838188 820737 0.0 80 0.001197000 0.000107800 0.000107800 0700 - 1900

KTD Rebuild Kai Tak Nullah 336 Line 838617 821010 838761 820833 0.0 40 0.000598700 0.000053910 0.000053910 0700 - 1900

KTD Rebuild Kai Tak Nullah 337 Line 838761 820833 838824 820640 0.0 40 0.000598700 0.000053910 0.000053910 0700 - 1900

KTD Rebuild Kai Tak Nullah 338 Line 838824 820640 838819 820471 0.0 40 0.000598700 0.000053910 0.000053910 0700 - 1900

KTD Construction of Road D1, L7, L8, L9 & L16 210 Line 837670 820839 837945 820573 0.0 20 0.000299400 0.000026950 0.000026950 0700 - 1900

KTD Contruction of T2, L10, L18 and footpaths 256 Line 839362 820000 839418 819945 0.0 50 0.000748400 0.000067380 0.000067380 0700 - 1900

KTD SCL Construction 334 Line 838178 820612 838063 820390 0.0 20 0.000299400 0.000026950 0.000026950 0700 - 1900

KTD Construction of Drainage Culvert 342 Line 837914 820618 837980 820630 0.0 10 0.000149700 0.000013480 0.000013480 0700 - 1900

KTD Construction of Drainage Culvert 343 Line 837980 820630 838134 820782 0.0 10 0.000149700 0.000013480 0.000013480 0700 - 1900

KTD Construction of Drainage Culvert 346 Line 838331 820962 838323 820931 0.0 6 0.000089810 0.000008086 0.000008086 0700 - 1900

KTD Construction of Drainage Culvert 347 Line 838323 820931 838379 820771 0.0 6 0.000089810 0.000008086 0.000008086 0700 - 1900

KTD Construction of Drainage Culvert 348 Line 838379 820771 838459 820793 0.0 6 0.000089810 0.000008086 0.000008086 0700 - 1900

KTD Construction of Road 291* Line 837966 820556 838081 820445 0.0 10 0.000149700 0.000013480 0.000013480 0700 - 1900

KTD Cut & Cover Section of T2 325 Line 839854 819426 839534 819753 0.0 40 0.000598700 0.000053910 0.000053910 0700 - 1900

KTD Rebuild Kai Tak Nullah 335 Line 838214 821403 838617 821010 0.0 40 0.000598700 0.000053910 0.000053910 0700 - 1900

SCL (HUH-TAW) Station Construction 29 Area 837394 819517 10 17 0.0 83 0.000017228 0.000000224 0.000002695 0700 - 1900

SCL (HUH-TAW) Station Construction 30 Area 837398 819533 21 22 0.0 83 0.000017228 0.000000224 0.000002695 0700 - 1900

SCL (HUH-TAW) Station Construction 31 Area 837411 819563 41 37 0.0 82 0.000017228 0.000000224 0.000002695 0700 - 1900

SCL (HUH-TAW) Station Construction 32 Area 837445 819592 20 32 0.0 90 0.000017228 0.000000224 0.000002695 0700 - 1900

SCL (HUH-TAW) Station Construction 33 Area 837422 819600 37 14 0.0 90 0.000017228 0.000000224 0.000002695 0700 - 1900

SCL (HUH-TAW) Station Construction 34 Area 837401 819603 38 30 0.0 90 0.000017228 0.000000224 0.000002695 0700 - 1900

SCL (HUH-TAW) Station Construction 35 Area 837397 819663 36 22 0.0 90 0.000017228 0.000000224 0.000002695 0700 - 1900

SCL (HUH-TAW) Station Construction 37 Area 837393 819847 78 14 0.0 90 0.000017228 0.000000224 0.000002695 0700 - 1900

SCL (HUH-TAW) Station Construction 38 Area 837407 819840 29 13 0.0 90 0.000017228 0.000000224 0.000002695 0700 - 1900

SCL (HUH-TAW) Station Construction 39 Area 837405 819870 19 11 0.0 90 0.000017228 0.000000224 0.000002695 0700 - 1900

SCL (HUH-TAW) Station Construction 40 Area 837334 819885 43 12 0.0 0 0.000017228 0.000000224 0.000002695 0700 - 1900

SCL (HUH-TAW) Station Construction 41 Area 837377 819804 359 15 0.0 90 0.000017228 0.000000224 0.000002695 0700 - 1900

SCL (HUH-TAW) Station Construction 42 Area 837297 819885 11 12 0.0 0 0.000017228 0.000000224 0.000002695 0700 - 1900

SCL (HUH-TAW) Station Construction 43 Area 837308 819885 10 39 0.0 0 0.000017228 0.000000224 0.000002695 0700 - 1900

SCL (HUH-TAW) Cut & Cover Construction 503 Area 838901 821604 172 54 0.0 48 0.000017228 0.000000224 0.000002695 0700 - 1900

SCL (HUH-TAW) Cut & Cover Construction 504 Area 838852 821606 111 21 0.0 48 0.000017228 0.000000224 0.000002695 0700 - 1900

SCL (HUH-TAW) Cut & Cover Construction 505 Area 838827 821532 32 68 0.0 48 0.000017228 0.000000224 0.000002695 0700 - 1900

SCL (HUH-TAW) Cut & Cover Construction 506 Area 838797 821475 89 104 0.0 46 0.000017228 0.000000224 0.000002695 0700 - 1900

SCL (HUH-TAW) Cut & Cover Construction 507 Area 838762 821436 14 136 0.0 46 0.000017228 0.000000224 0.000002695 0700 - 1900

SCL (HUH-TAW) Station Construction 508 Area 838707 821297 89 10 0.0 46 0.000017228 0.000000224 0.000002695 0700 - 1900

SCL (HUH-TAW) Station Construction 509 Area 838706 821254 25 48 0.0 46 0.000017228 0.000000224 0.000002695 0700 - 1900

SCL (HUH-TAW) Station Construction 510 Area 838618 821309 368 134 0.0 46 0.000017228 0.000000224 0.000002695 0700 - 1900

SCL (HUH-TAW) Cut & Cover Construction 512 Area 838551 821002 29 39 0.0 46 0.000017228 0.000000224 0.000002695 0700 - 1900

SCL (HUH-TAW) Cut & Cover Construction 513 Area 838493 821029 48 77 0.0 24 0.000017228 0.000000224 0.000002695 0700 - 1900

SCL (HUH-TAW) Cut & Cover Construction 514 Area 838350 821166 50 68 0.0 23 0.000017228 0.000000224 0.000002695 0700 - 1900

SCL (HUH-TAW) Cut & Cover Construction 515 Area 838386 821054 126 165 0.0 23 0.000017228 0.000000224 0.000002695 0700 - 1900

SCL (HUH-TAW) Cut & Cover Construction 516 Area 838289 821032 71 128 0.0 23 0.000017228 0.000000224 0.000002695 0700 - 1900

SCL (HUH-TAW) Cut & Cover Construction 517 Area 838235 820943 68 87 0.0 24 0.000017228 0.000000224 0.000002695 0700 - 1900

SCL (HUH-TAW) Cut & Cover Construction 518 Area 838088 820998 142 24 0.0 24 0.000017228 0.000000224 0.000002695 0700 - 1900

SCL (HUH-TAW) Station Construction 519 Area 837799 820891 122 59 0.0 23 0.000017228 0.000000224 0.000002695 0700 - 1900

SCL (HUH-TAW) Cut & Cover Construction 520 Area 838127 820917 150 156 0.0 24 0.000017228 0.000000224 0.000002695 0700 - 1900

SCL (HUH-TAW) Station Construction 540 Area 837824 820784 139 156 0.0 24 0.000017228 0.000000224 0.000002695 0700 - 1900

SCL (HUH-TAW) Station Construction 524 Area 837613 820615 46 22 0.0 65 0.000017228 0.000000224 0.000002695 0700 - 1900

SCL (HUH-TAW) Station Construction 525 Area 837630 820661 50 29 0.0 65 0.000017228 0.000000224 0.000002695 0700 - 1900

Concrete Batch Plant / Crushing

Emission Rate (g/s/sq.m)Height

Angle /

WidthWorking Hour

Heavy Construction Stockpiling Wind Erosion Barging Point

Dimension (m)

Projects Sources/ Activities Source ID Source Type

Coordinates of centroid

G:\env\project\217722-70\12 Reports Deliverables\11 EIA Report\06 Final Submission\Chapter 4\Appendices\Appendix 4.1b - Dust info_rev2.xlsx Page 15 of 19

Page 22: Appendix 4 - Environmental Protection Department...West Portion At-grade construction W-08 Area 835121 819227 172 16 0.5 11 0.000019878 0.000000224 0.000002695 0700 - 1900 West Portion

Location and Details of Worksites for Fugitive Dust Assessment - East Portion (Concurrent Projects/Sources)

X1 Y1 X2 Y2

(m) (m) (m) (m) (m) (deg / m) Working HoursNon-working

HoursWorking Hours

Non-working

HoursWorking Hours

Non-working

HoursWorking Hours

Non-working

HoursWorking Hours

Non-working

Hours

Concrete Batch Plant / Crushing

Emission Rate (g/s/sq.m)Height

Angle /

WidthWorking Hour

Heavy Construction Stockpiling Wind Erosion Barging Point

Dimension (m)

Projects Sources/ Activities Source ID Source Type

Coordinates of centroid

SCL (HUH-TAW) Station Construction 526 Area 837720 820676 82 121 0.0 65 0.000017228 0.000000224 0.000002695 0700 - 1900

SCL (HUH-TAW) Station Construction 527 Area 837723 820747 49 66 0.0 65 0.000017228 0.000000224 0.000002695 0700 - 1900

SCL (HUH-TAW) Station Construction 528 Area 837672 820758 162 35 0.0 65 0.000017228 0.000000224 0.000002695 0700 - 1900

SCL (HUH-TAW) Paved Haul Road to Barging Point 563 Area 838260 820914 158 8 0.0 45 0.000017228 0700 - 1900

SCL (HUH-TAW) Paved Haul Road to Barging Point 564 Area 838354 820941 8 82 0.0 45 0.000017228 0700 - 1900

SCL (HUH-TAW) Paved Haul Road to Barging Point 565 Area 838394 820887 8 51 0.0 22 0.000017228 0700 - 1900

SCL (HUH-TAW) Paved Haul Road to Barging Point 566 Area 838427 820836 8 75 0.0 40 0.000017228 0700 - 1900

SCL (HUH-TAW) Paved Haul Road to Barging Point 567 Area 838455 820789 35 8 0.0 2 0.000017228 0700 - 1900

SCL (HUH-TAW) Paved Haul Road to Barging Point 568 Area 838476 820762 8 35 0.0 71 0.000017228 0700 - 1900

SCL (HUH-TAW) Paved Haul Road to Barging Point 569 Area 838547 820637 8 257 0.0 23 0.000017228 0700 - 1900

SCL (HUH-TAW) Paved Haul Road to Barging Point 570 Area 838665 820450 8 191 0.0 46 0.000017228 0700 - 1900

SCL (HUH-TAW) Paved Haul Road to Barging Point 571 Area 838735 820374 28 6 0.0 69 0.000017228 0700 - 1900

SCL (HUH-TAW) Paved Haul Road to Barging Point 572 Area 838714 820350 35 6 0.0 31 0.000017228 0700 - 1900

SCL (HUH-TAW) Paved Haul Road to Barging Point 573 Area 838680 820347 6 35 0.0 71 0.000017228 0700 - 1900

SCL (HUH-TAW) Paved Haul Road to Barging Point 574 Area 838631 820276 173 6 0.0 69 0.000017228 0700 - 1900

SCL (HUH-TAW) Paved Haul Road to Barging Point 575 Area 838625 820167 5 79 0.0 49 0.000017228 0700 - 1900

SCL (HUH-TAW) Paved Haul Road to Barging Point 576 Area 838794 819996 8 487 0.0 47 0.000017228 0700 - 1900

SCL (HUH-TAW) Paved Haul Road to Barging Point 577 Area 838915 819763 176 8 0.0 47 0.000017228 0700 - 1900

SCL (HUH-TAW) Paved Haul Road 578 Area 838909 820214 11 467 0.0 46 0.000017228 0700 - 1900

SCL (HUH-TAW) Paved Haul Road 579 Area 839132 820115 155 6 0.0 46 0.000017228 0700 - 1900

SCL (HUH-TAW) Paved Haul Road 580 Area 839187 820173 6 85 0.0 46 0.000017228 0700 - 1900

SCL (HUH-TAW) Paved Haul Road 581 Area 839247 820142 57 6 0.0 3 0.000017228 0700 - 1900

SCL (HUH-TAW) Paved Haul Road 582 Area 839153 820231 6 57 0.0 3 0.000017228 0700 - 1900

SCL (HUH-TAW) Material Handling at Barging Point KTBgPt-1 Point 838714 819739 0 0 0.0 0 0.019076214 0700 - 1900

SCL (HUH-TAW) Material Handling at Barging Point KTBgPt-2 Point 838810 819646 0 0 0.0 0 0.019076214 0700 - 1900

SCL (HUH-TAW) Material Handling at Barging Point KTBgPt-3 Point 838906 819554 0 0 0.0 0 0.019076214 0700 - 1900

SCL (HUH-TAW) Paved Haul Road KTBgPt-HR1 Area 838709 819831 8 400 0.0 46 0.000017228 0700 - 1900

SCL (HUH-TAW) Paved Haul Road KTBgPt-HR2 Area 838556 819954 29 8 0.0 46 0.000017228 0700 - 1900

SCL (HUH-TAW) Paved Haul Road KTBgPt-HR3 Area 838760 819744 8 577 0.0 46 0.000017228 0700 - 1900

SCL (HUH-TAW) Paved Haul Road KTBgPt-HR4 Area 838987 819570 55 8 0.0 46 0.000017228 0700 - 1900

SCL (HUH-TAW) Paved Haul Road KTBgPt-HR5 Area 838937 819651 8 177 0.0 46 0.000017228 0700 - 1900

Potential New CBP New CBP-Silo NCBP-S8 Point 838375 820811 0 0 20.0 0 0.014833333 0700 - 1900

Potential New CBP New CBP-Silo NCBP-S9 Point 838380 820805 0 0 20.0 0 0.014833333 0700 - 1900

Potential New CBP New CBP-Silo NCBP-S10 Point 838386 820799 0 0 20.0 0 0.014833333 0700 - 1900

Potential New CBP New CBP-Silo NCBP-S12 Point 838383 820827 0 0 20.0 0 0.014833333 0700 - 1900

Potential New CBP New CBP-Silo NCBP-S13 Point 838388 820820 0 0 20.0 0 0.014833333 0700 - 1900

Potential New CBP New CBP-Silo NCBP-S14 Point 838393 820814 0 0 20.0 0 0.014833333 0700 - 1900

Potential New CBP New CBP-Silo NCBP-S15 Point 838399 820808 0 0 20.0 0 0.014833333 0700 - 1900

Potential New CBP New CBP-Mixer NCBP-M2 Point 838381 820817 0 0 15.0 0 0.019777778 0700 - 1900

Potential New CBP New CBP-Mixer NCBP-M3 Point 838376 820823 0 0 15.0 0 0.019777778 0700 - 1900

Potential New CBP New CBP-Mixer NCBP-M4 Point 838386 820810 0 0 15.0 0 0.019777778 0700 - 1900

Potential New CBP New CBP-Mixer NCBP-GH Point 838430 820783 0 0 0.5 0 0.023333333 0700 - 1900

Potential New CBP New CBP-Haul Road NCBP-HR1 Area 838436 820768 5 20 0.5 24 0.000017228 0700 - 1900

Potential New CBP New CBP-Haul Road NCBP-HR2 Area 838409 820792 5 51 0.5 57 0.000017228 0700 - 1900

Potential New CBP New Sand Depot-Wind Erosion SD-Wind Area 838318 820788 57 94 0.5 26 0.000000224 0.000002695 0700 - 1900

Potential New CBP New Sand Depot-Unloading SD-Mat Area 838318 820788 57 94 0.5 26 0.000000438 0700 - 1900

Potential New CBP New Sand Depot-Barging Point NCBPSD-UL Point 838629 819820 0 0 0.5 0 0.028261057 0700 - 1900

Potential New CBP New Sand Depot-Haul Road SD-HR1 Area 838370 820749 27 5 0.5 55 0.000017228 0700 - 1900

SCL (HUH-TAW) New Hau Road 600 Area 838413 820746 95 10 0.0 15 0.000017228 0700 - 1900

SCL (HUH-TAW) Station Construction 521* Area 837940 820939 175 35 0.0 24 0.000017228 0.000000224 0.000002695 0700 - 1900

SCL (HUH-TAW) Station Construction 522* Area 837973 820850 187 156 0.0 24 0.000017228 0.000000224 0.000002695 0700 - 1900

G:\env\project\217722-70\12 Reports Deliverables\11 EIA Report\06 Final Submission\Chapter 4\Appendices\Appendix 4.1b - Dust info_rev2.xlsx Page 16 of 19

Page 23: Appendix 4 - Environmental Protection Department...West Portion At-grade construction W-08 Area 835121 819227 172 16 0.5 11 0.000019878 0.000000224 0.000002695 0700 - 1900 West Portion

Location and Details of Worksites for Fugitive Dust Assessment - East Portion (Concurrent Projects/Sources)

Long-term (annual) assessment - Mitigated

X1 Y1 X2 Y2

(m) (m) (m) (m) (m) (deg / m) Working HoursNon-working

HoursWorking Hours

Non-working

HoursWorking Hours

Non-working

HoursWorking Hours

Non-working

HoursWorking Hours

Non-working

Hours

KTD Construction of Trunk Road T2 and Local Roads 211 Line 839409 819744 839198 819950 0.0 14 0.000025152 0.000002264 0.000002264 0700 - 1900

KTD Construction of Trunk Road T2 and Local Roads 212 Line 839198 819950 838847 820293 0.0 14 0.000025152 0.000002264 0.000002264 0700 - 1900

KTD Construction of Road L12 & L13 214 Line 839084 819672 839010 819487 0.0 20 0.000035928 0.000003234 0.000003234 0700 - 1900

KTD Construction of Road D3 237 Line 838582 820607 838619 820501 0.0 20 0.000035928 0.000003234 0.000003234 0700 - 1900

KTD Construction of Road D3 238 Line 838619 820501 838598 820209 0.0 20 0.000035928 0.000003234 0.000003234 0700 - 1900

KTD Construction of Road D3 239 Line 838598 820209 838608 820161 0.0 20 0.000035928 0.000003234 0.000003234 0700 - 1900

KTD Construction of Road D3 240 Line 838608 820161 838630 820118 0.0 20 0.000035928 0.000003234 0.000003234 0700 - 1900

KTD Construction of Road D3 241 Line 838630 820118 838665 820080 0.0 20 0.000035928 0.000003234 0.000003234 0700 - 1900

KTD Elevated Landscape Deck above Road D3 303 Line 839088 819697 839408 819386 0.0 40 0.000071844 0.000006469 0.000006469 0700 - 1900

KTD Conversion of TD4 into D4 309 Line 839476 819784 839260 819559 0.0 40 0.000071844 0.000006469 0.000006469 0700 - 1900

KTD Cut & Cover Section of T2 326 Line 839534 819753 839260 820042 0.0 40 0.000071844 0.000006469 0.000006469 0700 - 1900

KTD Construction of Pumping Station PS1A 340 Line 838891 820937 838946 820882 0.0 43 0.000077232 0.000006954 0.000006954 0700 - 1900

KTD Local Roads L4 & L5 354 Line 839035 820932 838829 821133 0.0 18 0.000032328 0.000002911 0.000002911 0700 - 1900

KTD Local Roads L4 & L5 355 Line 838935 821041 838991 821105 0.0 20 0.000035928 0.000003234 0.000003234 0700 - 1900

KTD Local Roads L4 & L5 356 Line 838829 821133 838716 821245 0.0 18 0.000032328 0.000002911 0.000002911 0700 - 1900

KTD Local Roads L4 & L5 357 Line 838815 821133 838710 821025 0.0 20 0.000035928 0.000003234 0.000003234 0700 - 1900

KTD Construction of Road D2, D3, L6, L17 & L19 206 Line 838568 820644 838487 820794 0.0 20 0.000035928 0.000003234 0.000003234 0700 - 1900

KTD Construction of Road D2, D3, L6, L17 & L19 207 Line 838487 820794 838605 820919 0.0 20 0.000035928 0.000003234 0.000003234 0700 - 1900

KTD Construction of Road D2, D3, L6, L17 & L19 218 Line 837858 819750 837930 819706 0.0 10 0.000017964 0.000001618 0.000001618 0700 - 1900

KTD Construction of Road D2, D3, L6, L17 & L19 220 Line 837657 819505 837755 819460 0.0 20 0.000035928 0.000003234 0.000003234 0700 - 1900

KTD Construction of Road D2, D3, L6, L17 & L19 221 Line 837755 819460 837772 819405 0.0 20 0.000035928 0.000003234 0.000003234 0700 - 1900

KTD Construction of Road D2, D3, L6, L17 & L19 222 Line 837772 819405 837735 819359 0.0 20 0.000035928 0.000003234 0.000003234 0700 - 1900

KTD Construction of Road D2, D3, L6, L17 & L19 223 Line 837735 819359 837697 819325 0.0 20 0.000035928 0.000003234 0.000003234 0700 - 1900

KTD Construction of Road D2, D3, L6, L17 & L19 224 Line 837697 819325 837663 819253 0.0 20 0.000035928 0.000003234 0.000003234 0700 - 1900

KTD Pumping Station PS2 243 Line 838568 820717 838609 820662 0.0 50 0.000089808 0.000008086 0.000008086 0700 - 1900

KTD Stadium Complex 291 Line 838288 820767 838292 820619 0.0 106 0.000190440 0.000017148 0.000017148 0700 - 1900

KTD Stadium Complex 292 Line 838366 820499 838367 820202 0.0 220 0.000395160 0.000035580 0.000035580 0700 - 1900

KTD Stadium Complex 293 Line 838033 820544 838188 820737 0.0 80 0.000143640 0.000012936 0.000012936 0700 - 1900

KTD Rebuild Kai Tak Nullah 336 Line 838617 821010 838761 820833 0.0 40 0.000071844 0.000006469 0.000006469 0700 - 1900

KTD Rebuild Kai Tak Nullah 337 Line 838761 820833 838824 820640 0.0 40 0.000071844 0.000006469 0.000006469 0700 - 1900

KTD Rebuild Kai Tak Nullah 338 Line 838824 820640 838819 820471 0.0 40 0.000071844 0.000006469 0.000006469 0700 - 1900

KTD Construction of Road D1, L7, L8, L9 & L16 210 Line 837670 820839 837945 820573 0.0 20 0.000035928 0.000003234 0.000003234 0700 - 1900

KTD Contruction of T2, L10, L18 and footpaths 256 Line 839362 820000 839418 819945 0.0 50 0.000089808 0.000008086 0.000008086 0700 - 1900

KTD SCL Construction 334 Line 838178 820612 838063 820390 0.0 20 0.000035928 0.000003234 0.000003234 0700 - 1900

KTD Construction of Drainage Culvert 342 Line 837914 820618 837980 820630 0.0 10 0.000017964 0.000001618 0.000001618 0700 - 1900

KTD Construction of Drainage Culvert 343 Line 837980 820630 838134 820782 0.0 10 0.000017964 0.000001618 0.000001618 0700 - 1900

KTD Construction of Drainage Culvert 346 Line 838331 820962 838323 820931 0.0 6 0.000010777 0.000000970 0.000000970 0700 - 1900

KTD Construction of Drainage Culvert 347 Line 838323 820931 838379 820771 0.0 6 0.000010777 0.000000970 0.000000970 0700 - 1900

KTD Construction of Drainage Culvert 348 Line 838379 820771 838459 820793 0.0 6 0.000010777 0.000000970 0.000000970 0700 - 1900

KTD Construction of Road 291* Line 837966 820556 838081 820445 0.0 10 0.000017964 0.000001618 0.000001618 0700 - 1900

KTD Cut & Cover Section of T2 325 Line 839854 819426 839534 819753 0.0 40 0.000071844 0.000006469 0.000006469 0700 - 1900

KTD Rebuild Kai Tak Nullah 335 Line 838214 821403 838617 821010 0.0 40 0.000071844 0.000006469 0.000006469 0700 - 1900

SCL (HUH-TAW) Station Construction 29 Area 837394 819517 10 17 0.0 83 0.000001034 0.000000013 0.000000162 0700 - 1900

SCL (HUH-TAW) Station Construction 30 Area 837398 819533 21 22 0.0 83 0.000001034 0.000000013 0.000000162 0700 - 1900

SCL (HUH-TAW) Station Construction 31 Area 837411 819563 41 37 0.0 82 0.000001034 0.000000013 0.000000162 0700 - 1900

SCL (HUH-TAW) Station Construction 32 Area 837445 819592 20 32 0.0 90 0.000001034 0.000000013 0.000000162 0700 - 1900

SCL (HUH-TAW) Station Construction 33 Area 837422 819600 37 14 0.0 90 0.000001034 0.000000013 0.000000162 0700 - 1900

SCL (HUH-TAW) Station Construction 34 Area 837401 819603 38 30 0.0 90 0.000001034 0.000000013 0.000000162 0700 - 1900

SCL (HUH-TAW) Station Construction 35 Area 837397 819663 36 22 0.0 90 0.000001034 0.000000013 0.000000162 0700 - 1900

SCL (HUH-TAW) Station Construction 37 Area 837393 819847 78 14 0.0 90 0.000001034 0.000000013 0.000000162 0700 - 1900

SCL (HUH-TAW) Station Construction 38 Area 837407 819840 29 13 0.0 90 0.000001034 0.000000013 0.000000162 0700 - 1900

SCL (HUH-TAW) Station Construction 39 Area 837405 819870 19 11 0.0 90 0.000001034 0.000000013 0.000000162 0700 - 1900

SCL (HUH-TAW) Station Construction 40 Area 837334 819885 43 12 0.0 0 0.000001034 0.000000013 0.000000162 0700 - 1900

SCL (HUH-TAW) Station Construction 41 Area 837377 819804 359 15 0.0 90 0.000001034 0.000000013 0.000000162 0700 - 1900

SCL (HUH-TAW) Station Construction 42 Area 837297 819885 11 12 0.0 0 0.000001034 0.000000013 0.000000162 0700 - 1900

SCL (HUH-TAW) Station Construction 43 Area 837308 819885 10 39 0.0 0 0.000001034 0.000000013 0.000000162 0700 - 1900

SCL (HUH-TAW) Cut & Cover Construction 503 Area 838901 821604 172 54 0.0 48 0.000001034 0.000000013 0.000000162 0700 - 1900

SCL (HUH-TAW) Cut & Cover Construction 504 Area 838852 821606 111 21 0.0 48 0.000001034 0.000000013 0.000000162 0700 - 1900

SCL (HUH-TAW) Cut & Cover Construction 505 Area 838827 821532 32 68 0.0 48 0.000001034 0.000000013 0.000000162 0700 - 1900

SCL (HUH-TAW) Cut & Cover Construction 506 Area 838797 821475 89 104 0.0 46 0.000001034 0.000000013 0.000000162 0700 - 1900

SCL (HUH-TAW) Cut & Cover Construction 507 Area 838762 821436 14 136 0.0 46 0.000001034 0.000000013 0.000000162 0700 - 1900

SCL (HUH-TAW) Station Construction 508 Area 838707 821297 89 10 0.0 46 0.000001034 0.000000013 0.000000162 0700 - 1900

SCL (HUH-TAW) Station Construction 509 Area 838706 821254 25 48 0.0 46 0.000001034 0.000000013 0.000000162 0700 - 1900

SCL (HUH-TAW) Station Construction 510 Area 838618 821309 368 134 0.0 46 0.000001034 0.000000013 0.000000162 0700 - 1900

SCL (HUH-TAW) Cut & Cover Construction 512 Area 838551 821002 29 39 0.0 46 0.000001034 0.000000013 0.000000162 0700 - 1900

SCL (HUH-TAW) Cut & Cover Construction 513 Area 838493 821029 48 77 0.0 24 0.000001034 0.000000013 0.000000162 0700 - 1900

SCL (HUH-TAW) Cut & Cover Construction 514 Area 838350 821166 50 68 0.0 23 0.000001034 0.000000013 0.000000162 0700 - 1900

SCL (HUH-TAW) Cut & Cover Construction 515 Area 838386 821054 126 165 0.0 23 0.000001034 0.000000013 0.000000162 0700 - 1900

SCL (HUH-TAW) Cut & Cover Construction 516 Area 838289 821032 71 128 0.0 23 0.000001034 0.000000013 0.000000162 0700 - 1900

SCL (HUH-TAW) Cut & Cover Construction 517 Area 838235 820943 68 87 0.0 24 0.000001034 0.000000013 0.000000162 0700 - 1900

SCL (HUH-TAW) Cut & Cover Construction 518 Area 838088 820998 142 24 0.0 24 0.000001034 0.000000013 0.000000162 0700 - 1900

SCL (HUH-TAW) Station Construction 519 Area 837799 820891 122 59 0.0 23 0.000001034 0.000000013 0.000000162 0700 - 1900

SCL (HUH-TAW) Cut & Cover Construction 520 Area 838127 820917 150 156 0.0 24 0.000001034 0.000000013 0.000000162 0700 - 1900

SCL (HUH-TAW) Station Construction 540 Area 837824 820784 139 156 0.0 24 0.000001034 0.000000013 0.000000162 0700 - 1900

SCL (HUH-TAW) Station Construction 524 Area 837613 820615 46 22 0.0 65 0.000001034 0.000000013 0.000000162 0700 - 1900

SCL (HUH-TAW) Station Construction 525 Area 837630 820661 50 29 0.0 65 0.000001034 0.000000013 0.000000162 0700 - 1900

HeightAngle /

Width

Emission Rate (g/s/sq.m)

Working HourHeavy Construction Stockpiling Wind Erosion Barging Point Concrete Batch Plant / Crushing

Dimension (m)

Projects Sources/ Activities Source ID Source Type

Coordinates of centroid

G:\env\project\217722-70\12 Reports Deliverables\11 EIA Report\06 Final Submission\Chapter 4\Appendices\Appendix 4.1b - Dust info_rev2.xlsx Page 17 of 19

Page 24: Appendix 4 - Environmental Protection Department...West Portion At-grade construction W-08 Area 835121 819227 172 16 0.5 11 0.000019878 0.000000224 0.000002695 0700 - 1900 West Portion

Location and Details of Worksites for Fugitive Dust Assessment - East Portion (Concurrent Projects/Sources)

X1 Y1 X2 Y2

(m) (m) (m) (m) (m) (deg / m) Working HoursNon-working

HoursWorking Hours

Non-working

HoursWorking Hours

Non-working

HoursWorking Hours

Non-working

HoursWorking Hours

Non-working

Hours

HeightAngle /

Width

Emission Rate (g/s/sq.m)

Working HourHeavy Construction Stockpiling Wind Erosion Barging Point Concrete Batch Plant / Crushing

Dimension (m)

Projects Sources/ Activities Source ID Source Type

Coordinates of centroid

SCL (HUH-TAW) Station Construction 526 Area 837720 820676 82 121 0.0 65 0.000001034 0.000000013 0.000000162 0700 - 1900

SCL (HUH-TAW) Station Construction 527 Area 837723 820747 49 66 0.0 65 0.000001034 0.000000013 0.000000162 0700 - 1900

SCL (HUH-TAW) Station Construction 528 Area 837672 820758 162 35 0.0 65 0.000001034 0.000000013 0.000000162 0700 - 1900

SCL (HUH-TAW) Paved Haul Road to Barging Point 563 Area 838260 820914 158 8 0.0 45 0.000017228 0700 - 1900

SCL (HUH-TAW) Paved Haul Road to Barging Point 564 Area 838354 820941 8 82 0.0 45 0.000017228 0700 - 1900

SCL (HUH-TAW) Paved Haul Road to Barging Point 565 Area 838394 820887 8 51 0.0 22 0.000017228 0700 - 1900

SCL (HUH-TAW) Paved Haul Road to Barging Point 566 Area 838427 820836 8 75 0.0 40 0.000017228 0700 - 1900

SCL (HUH-TAW) Paved Haul Road to Barging Point 567 Area 838455 820789 35 8 0.0 2 0.000017228 0700 - 1900

SCL (HUH-TAW) Paved Haul Road to Barging Point 568 Area 838476 820762 8 35 0.0 71 0.000017228 0700 - 1900

SCL (HUH-TAW) Paved Haul Road to Barging Point 569 Area 838547 820637 8 257 0.0 23 0.000017228 0700 - 1900

SCL (HUH-TAW) Paved Haul Road to Barging Point 570 Area 838665 820450 8 191 0.0 46 0.000017228 0700 - 1900

SCL (HUH-TAW) Paved Haul Road to Barging Point 571 Area 838735 820374 28 6 0.0 69 0.000017228 0700 - 1900

SCL (HUH-TAW) Paved Haul Road to Barging Point 572 Area 838714 820350 35 6 0.0 31 0.000017228 0700 - 1900

SCL (HUH-TAW) Paved Haul Road to Barging Point 573 Area 838680 820347 6 35 0.0 71 0.000017228 0700 - 1900

SCL (HUH-TAW) Paved Haul Road to Barging Point 574 Area 838631 820276 173 6 0.0 69 0.000017228 0700 - 1900

SCL (HUH-TAW) Paved Haul Road to Barging Point 575 Area 838625 820167 5 79 0.0 49 0.000017228 0700 - 1900

SCL (HUH-TAW) Paved Haul Road to Barging Point 576 Area 838794 819996 8 487 0.0 47 0.000017228 0700 - 1900

SCL (HUH-TAW) Paved Haul Road to Barging Point 577 Area 838915 819763 176 8 0.0 47 0.000017228 0700 - 1900

SCL (HUH-TAW) Paved Haul Road 578 Area 838909 820214 11 467 0.0 46 0.000017228 0700 - 1900

SCL (HUH-TAW) Paved Haul Road 579 Area 839132 820115 155 6 0.0 46 0.000017228 0700 - 1900

SCL (HUH-TAW) Paved Haul Road 580 Area 839187 820173 6 85 0.0 46 0.000017228 0700 - 1900

SCL (HUH-TAW) Paved Haul Road 581 Area 839247 820142 57 6 0.0 3 0.000017228 0700 - 1900

SCL (HUH-TAW) Paved Haul Road 582 Area 839153 820231 6 57 0.0 3 0.000017228 0700 - 1900

SCL (HUH-TAW) Material Handling at Barging Point KTBgPt-1 Point 838714 819739 0 0 0.0 0 0.019076214 0700 - 1900

SCL (HUH-TAW) Material Handling at Barging Point KTBgPt-2 Point 838810 819646 0 0 0.0 0 0.019076214 0700 - 1900

SCL (HUH-TAW) Material Handling at Barging Point KTBgPt-3 Point 838906 819554 0 0 0.0 0 0.019076214 0700 - 1900

SCL (HUH-TAW) Paved Haul Road KTBgPt-HR1 Area 838709 819831 8 400 0.0 46 0.000017228 0700 - 1900

SCL (HUH-TAW) Paved Haul Road KTBgPt-HR2 Area 838556 819954 29 8 0.0 46 0.000017228 0700 - 1900

SCL (HUH-TAW) Paved Haul Road KTBgPt-HR3 Area 838760 819744 8 577 0.0 46 0.000017228 0700 - 1900

SCL (HUH-TAW) Paved Haul Road KTBgPt-HR4 Area 838987 819570 55 8 0.0 46 0.000017228 0700 - 1900

SCL (HUH-TAW) Paved Haul Road KTBgPt-HR5 Area 838937 819651 8 177 0.0 46 0.000017228 0700 - 1900

Potential New CBP New CBP-Silo NCBP-S8 Point 838375 820811 0 0 20.0 0 0.014833333 0700 - 1900

Potential New CBP New CBP-Silo NCBP-S9 Point 838380 820805 0 0 20.0 0 0.014833333 0700 - 1900

Potential New CBP New CBP-Silo NCBP-S10 Point 838386 820799 0 0 20.0 0 0.014833333 0700 - 1900

Potential New CBP New CBP-Silo NCBP-S12 Point 838383 820827 0 0 20.0 0 0.014833333 0700 - 1900

Potential New CBP New CBP-Silo NCBP-S13 Point 838388 820820 0 0 20.0 0 0.014833333 0700 - 1900

Potential New CBP New CBP-Silo NCBP-S14 Point 838393 820814 0 0 20.0 0 0.014833333 0700 - 1900

Potential New CBP New CBP-Silo NCBP-S15 Point 838399 820808 0 0 20.0 0 0.014833333 0700 - 1900

Potential New CBP New CBP-Mixer NCBP-M2 Point 838381 820817 0 0 15.0 0 0.019777778 0700 - 1900

Potential New CBP New CBP-Mixer NCBP-M3 Point 838376 820823 0 0 15.0 0 0.019777778 0700 - 1900

Potential New CBP New CBP-Mixer NCBP-M4 Point 838386 820810 0 0 15.0 0 0.019777778 0700 - 1900

Potential New CBP New CBP-Mixer NCBP-GH Point 838430 820783 0 0 0.5 0 0.023333333 0700 - 1900

Potential New CBP New CBP-Haul Road NCBP-HR1 Area 838436 820768 5 20 0.5 24 0.000017228 0700 - 1900

Potential New CBP New CBP-Haul Road NCBP-HR2 Area 838409 820792 5 51 0.5 57 0.000017228 0700 - 1900

Potential New CBP New Sand Depot-Wind Erosion SD-Wind Area 838318 820788 57 94 0.5 26 0.000000224 0.000002695 0700 - 1900

Potential New CBP New Sand Depot-Unloading SD-Mat Area 838318 820788 57 94 0.5 26 0.000000438 0700 - 1900

Potential New CBP New Sand Depot-Barging Point NCBPSD-UL Point 838629 819820 0 0 0.5 0 0.028261057 0700 - 1900

Potential New CBP New Sand Depot-Haul Road SD-HR1 Area 838370 820749 27 5 0.5 55 0.000017228 0700 - 1900

SCL (HUH-TAW) New Hau Road 600 Area 838413 820746 95 10 0.0 15 0.000017228 0700 - 1900

SCL (HUH-TAW) Station Construction 521* Area 837940 820939 175 35 0.0 24 0.000001034 0.000000013 0.000000162 0700 - 1900

SCL (HUH-TAW) Station Construction 522* Area 837973 820850 187 156 0.0 24 0.000001034 0.000000013 0.000000162 0700 - 1900

G:\env\project\217722-70\12 Reports Deliverables\11 EIA Report\06 Final Submission\Chapter 4\Appendices\Appendix 4.1b - Dust info_rev2.xlsx Page 18 of 19

Page 25: Appendix 4 - Environmental Protection Department...West Portion At-grade construction W-08 Area 835121 819227 172 16 0.5 11 0.000019878 0.000000224 0.000002695 0700 - 1900 West Portion

Location and Details of Worksites for Fugitive Dust Assessment - Barging Point

Short-term (1-hour & 24-hour) and Long-term (annual) assessment - Mitigated

X1 Y1 X2 Y2

(m) (m) (m) (m) (m) (deg / m) Working HoursNon-working

HoursWorking Hours

Non-working

HoursWorking Hours

Non-working

Hours

Barging Point Barging Point BP1 POINT 829773 823644 0 0 0.5 0 0.031332796 0700 - 1900

Barging Point Barging Point BP2 POINT 829825 823548 0 0 0.5 0 0.031332796 0700 - 1900

Barging Point Haul Road ROAD1 Area 829813 823633 5 68 0.5 72 0.000019878 0700 - 1900

Barging Point Haul Road ROAD2 Area 829842 823579 57 5 0.5 66 0.000019878 0700 - 1900

Short-term (1-hour & 24-hour) and Long-term (annual) assessment - Unmitigated

X1 Y1 X2 Y2

(m) (m) (m) (m) (m) (deg / m) Working HoursNon-working

HoursWorking Hours

Non-working

HoursWorking Hours

Non-working

Hours

Barging Point Barging Point BP1 POINT 829773 823644 0 0 0.5 0 0.062665592 0700 - 1900

Barging Point Barging Point BP2 POINT 829825 823548 0 0 0.5 0 0.062665592 0700 - 1900

Barging Point Haul Road ROAD1 Area 829813 823633 5 68 0.5 72 0.000239494 0700 - 1900

Barging Point Haul Road ROAD2 Area 829842 823579 57 5 0.5 66 0.000239494 0700 - 1900

Location Sources/ Activities Source IDSource

Type

Coordinates of centroid Dimension (m)

HeightAngle /

Width

Emission Rate (g/s/sq.m)

Working HourHeavy Construction Barging Point Wind Erosion

Dimension (m)

HeightAngle /

Width

Emission Rate (g/s/sq.m)

Working HourHeavy Construction Barging Point Wind Erosion

Location Sources/ Activities Source IDSource

Type

Coordinates of centroid

G:\env\project\217722-70\12 Reports Deliverables\11 EIA Report\06 Final Submission\Chapter 4\Appendices\Appendix 4.1b - Dust info_rev2.xlsx Page 19 of 19

Page 26: Appendix 4 - Environmental Protection Department...West Portion At-grade construction W-08 Area 835121 819227 172 16 0.5 11 0.000019878 0.000000224 0.000002695 0700 - 1900 West Portion
Page 27: Appendix 4 - Environmental Protection Department...West Portion At-grade construction W-08 Area 835121 819227 172 16 0.5 11 0.000019878 0.000000224 0.000002695 0700 - 1900 West Portion
Page 28: Appendix 4 - Environmental Protection Department...West Portion At-grade construction W-08 Area 835121 819227 172 16 0.5 11 0.000019878 0.000000224 0.000002695 0700 - 1900 West Portion
Page 29: Appendix 4 - Environmental Protection Department...West Portion At-grade construction W-08 Area 835121 819227 172 16 0.5 11 0.000019878 0.000000224 0.000002695 0700 - 1900 West Portion
Page 30: Appendix 4 - Environmental Protection Department...West Portion At-grade construction W-08 Area 835121 819227 172 16 0.5 11 0.000019878 0.000000224 0.000002695 0700 - 1900 West Portion
Page 31: Appendix 4 - Environmental Protection Department...West Portion At-grade construction W-08 Area 835121 819227 172 16 0.5 11 0.000019878 0.000000224 0.000002695 0700 - 1900 West Portion
Page 32: Appendix 4 - Environmental Protection Department...West Portion At-grade construction W-08 Area 835121 819227 172 16 0.5 11 0.000019878 0.000000224 0.000002695 0700 - 1900 West Portion
Page 33: Appendix 4 - Environmental Protection Department...West Portion At-grade construction W-08 Area 835121 819227 172 16 0.5 11 0.000019878 0.000000224 0.000002695 0700 - 1900 West Portion
Page 34: Appendix 4 - Environmental Protection Department...West Portion At-grade construction W-08 Area 835121 819227 172 16 0.5 11 0.000019878 0.000000224 0.000002695 0700 - 1900 West Portion