8/6/2018
1
UT Dallas Bioengineering and Sciences Building Water Conservation Trifecta
Project Leadership
Rick Dempsey, PEUniversity of Texas at DallasAssociate Vice President for
Facilities Management
Kevin MastenUniversity of Texas at Dallas
Director of Research Facilities Operations
Shara Pic
Shara Castillo, LEED AP BD+CZGF Architects LLPAssociate Partner
8/6/2018
2
About UTD
Rooted in Research
Founded in 1969
28,000 Students
8 schools
141 programs
Young, Geeky, and Innovative!
STEM Focused
40% Increase
http://www.utdallas.edu/sustainability/
5 Years of Growth
8/6/2018
3
87% Increase
http://www.utdallas.edu/sustainability/
5 Years of Growth
40% Increase
http://www.utdallas.edu/sustainability/
5 Years of Growth
72% Increase72%
Increase
8/6/2018
4
http://www.utdallas.edu/sustainability/
• Size: 222,651 gross square feet• Project Cost: $109,000,000• Project Completed: Fall 2015• Research Programs: Chemistry,
Bioengineering, Neuroscience, Biomedical Science
Bioengineering and Sciences Building (BSB) Project Overview
http://www.utdallas.edu/sustainability/
• 72 Research Labs• 690 work stations• 142 offices• 12 conference rooms • 8 Integrated collaboration areas
• Connections to sister facility (NSERL)
About Bioengineering and Sciences Building
8/6/2018
5
http://www.utdallas.edu/sustainability/
About Bioengineering and Sciences Building
• 72 Research Labs• 690 work stations• 142 offices• 12 conference rooms • 8 Integrated collaboration areas
• Connections to sister facility (NSERL)
http://www.utdallas.edu/sustainability/
About Bioengineering and Sciences Building
• 72 Research Labs• 690 work stations• 142 offices• 12 conference rooms • 8 Integrated collaboration areas
• Connections to sister facility (NSERL)
8/6/2018
6
http://www.utdallas.edu/sustainability/
About Bioengineering and Sciences Building
• 72 Research Labs• 690 work stations• 142 offices• 12 conference rooms • 8 Integrated collaboration areas
• Connections to sister facility (NSERL)
http://www.utdallas.edu/sustainability/
About Bioengineering and Sciences Building
• 72 Research Labs• 690 work stations• 142 offices• 12 conference rooms • 8 Integrated collaboration areas
• Connections to sister facility (NSERL)
8/6/2018
7
Project Analysis
and Design
Shara Castillo
ZGF Architects LLP
Photo: Paulo Peres
http://www.utdallas.edu/sustainability/
The Need to Do More With Less Water
8/6/2018
8
http://www.utdallas.edu/sustainability/
Regional Drought Calls for Innovation in Water Conservation
http://www.utdallas.edu/sustainability/
Regional Drought Calls for Innovation in Water Conservation
8/6/2018
9
http://www.utdallas.edu/sustainability/
Regional Drought Calls for Innovation in Water Conservation
Stable Water Supply Unstable Water Supply
Droughts; 2007, 2011, 2012 – 2014
http://www.utdallas.edu/sustainability/
?
?
?
?
?
?
?
Laboratory Water Use
Laboratories
Water U
se Intensity (gal / ft 2
CS1
Slide 18
CS1 Castillo, Shara, 6/26/2018
8/6/2018
10
http://www.utdallas.edu/sustainability/
Projected Water Use
RO System
Flushing
Irrigation
Sinks
Analysis by ZGF Architects LLP
http://www.utdallas.edu/sustainability/
Analysis by ZGF Architects LLP
Water Analysis
15,000
15,000
15,000
15,000
8/6/2018
11
http://www.utdallas.edu/sustainability/
Water Analysis
Case 5• Efficient Fixtures• Condensate (BSB) Reuse• 6,500 Gallon Tank• for RO Feed Water• RO Reject (BSB,• NSERL) Reuse • Rainwater from Roof
Reuse• 15,000 Gallon Tank for
Irrigation
Analysis by ZGF Architects LLP
http://www.utdallas.edu/sustainability/
Water Analysis
Analysis by ZGF Architects LLP
8/6/2018
12
http://www.utdallas.edu/sustainability/
System Design
IRRIGATION
http://www.utdallas.edu/sustainability/
System Design
REVERSE OSMOSIS (BSB)
8/6/2018
13
http://www.utdallas.edu/sustainability/
System Design
COOLING COIL CONDENSATE (BSB)
http://www.utdallas.edu/sustainability/
System Design
REVERSE OSMOSIS REJECT (NSERL)
8/6/2018
14
http://www.utdallas.edu/sustainability/
System Design
RAINWATER
http://www.utdallas.edu/sustainability/
System Design
POTABLE MUNICIPAL WATER
8/6/2018
15
Construction,
Operation, and
Equipment
Kevin Masten
Director of Research Facilities Operations
Photo: Paulo Peres
http://www.utdallas.edu/sustainability/
NSERL RO Control Panel
NSERL BUILDING
8/6/2018
16
http://www.utdallas.edu/sustainability/
BSB 15,000 Gallon Cistern
http://www.utdallas.edu/sustainability/
BSB Control Panel
8/6/2018
17
http://www.utdallas.edu/sustainability/
BSB RO Controller, Membranes, and Storage
http://www.utdallas.edu/sustainability/
BSB Softener and Brine Tank
8/6/2018
18
http://www.utdallas.edu/sustainability/
BSB Metering
http://www.utdallas.edu/sustainability/
• 2.5 million gallons saved from RO capture
• Metering installation for other components in progress.
• Double value by capturing waste for reuse.
• Water costs have doubled over the last decade. Savings will magnify as cost of water rises.
• ROI will not justify project alone. Consider issues of regional importance and campus resiliency when planning.
Numbers and Outcomes
8/6/2018
19
http://www.utdallas.edu/sustainability/
A Solution That Makes Sense for UTD