44
“Pushing the Limits of Constructability Pushes the Limits of Stakeholder Involvement” Case Study: Myrtle-Morehead SDIP City of Charlotte, North Carolina Presented By: Chip Smith, PE – Woolpert Kate Labadorf, PE – City of Charlotte Storm Water Services North Carolina AWWA/WEA 2015 Annual Conference

“Pushing the Limits of Constructability Pushes the Limits of ......“Pushing the Limits of Constructability Pushes the Limits of Stakeholder Involvement” Case Study: Myrtle-Morehead

  • Upload
    others

  • View
    5

  • Download
    0

Embed Size (px)

Citation preview

Page 1: “Pushing the Limits of Constructability Pushes the Limits of ......“Pushing the Limits of Constructability Pushes the Limits of Stakeholder Involvement” Case Study: Myrtle-Morehead

“Pushing the Limits of Constructability Pushes the Limits of Stakeholder

Involvement”Case Study: Myrtle-Morehead SDIP

City of Charlotte, North Carolina

Presented By:Chip Smith, PE – Woolpert

Kate Labadorf, PE – City of Charlotte Storm Water Services

North Carolina AWWA/WEA2015 Annual Conference

Page 2: “Pushing the Limits of Constructability Pushes the Limits of ......“Pushing the Limits of Constructability Pushes the Limits of Stakeholder Involvement” Case Study: Myrtle-Morehead

Presentation Outline

• Overview of Charlotte’s Flood Control Program• Myrtle-Morehead Project History• Phase 1 Constructability Issues Realized• Phase 2 Constructability Issues Under Design• Lessons Learned• Questions and Answers

Page 3: “Pushing the Limits of Constructability Pushes the Limits of ......“Pushing the Limits of Constructability Pushes the Limits of Stakeholder Involvement” Case Study: Myrtle-Morehead

City Flood Control Projects

• Drainage system improvements for watersheds up to one square mile

• Typical planning, design and construction duration – 5 to 7 years

• Typical costs range from $500,000 - $10 million

• Annual Funding of $17.3 million

Page 4: “Pushing the Limits of Constructability Pushes the Limits of ......“Pushing the Limits of Constructability Pushes the Limits of Stakeholder Involvement” Case Study: Myrtle-Morehead

Problems:• Roadway flooding• Structural flooding• Stream erosion• Deteriorating infrastructure

4

High Water Marks

11024 Blue Heron Drive

Flood Control Project Types

Kingfisher Drive

Presenter
Presentation Notes
June 18, 2003 – 2 year storm event. Kingfisher LOS < 2 year event. August 26, 2008 – Between 10 and 25 year event (4506 – McAlpine Creek WWTP – 4.28 inches in 6-hour event). 11025 Blue Heron Drive FFE LOS 2 year event. 7.68 inches of rain over a 2 day period Blue Heron Drive (2 year LOS) - Standard = 25 year storm Kingfisher Drive (< 2 year LOS) - Standard = 25 year storm Osprey Drive (< 2 year LOS) - Standard = 25 year storm Flat Iron Road Nightingale Lane Park Road Park Vista Circle Timbercrest Circle Trailview Drive Structural flooding is HVAC, Finished floor and crawl space flooding District 7
Page 5: “Pushing the Limits of Constructability Pushes the Limits of ......“Pushing the Limits of Constructability Pushes the Limits of Stakeholder Involvement” Case Study: Myrtle-Morehead

Problems: • Road Flooding - 6 Roads• Structure Flooding - 20

structures• Deteriorating Infrastructure

Myrtle/Morehead Project

Parking deck flooding

Metal pipe with holes in bottom

Presenter
Presentation Notes
Developed in the mid-1970’s Drainage Area = 215 acres District 1
Page 6: “Pushing the Limits of Constructability Pushes the Limits of ......“Pushing the Limits of Constructability Pushes the Limits of Stakeholder Involvement” Case Study: Myrtle-Morehead

Project History/Existing System Problems

• Project initiated in 2000 due to chronic flooding of Myrtle Square Apartments, Euclid Avenue, Myrtle Avenue, and Lexington Avenue

• Dilworth area was developed around a creek that was piped with various undersized culverts

• Existing culvert is located underneath and behind numerous houses and apartments

• Dilworth area is a designated Historic Area with homes exceeding $1M in value

Page 7: “Pushing the Limits of Constructability Pushes the Limits of ......“Pushing the Limits of Constructability Pushes the Limits of Stakeholder Involvement” Case Study: Myrtle-Morehead

Project Study Area

Project Area

Myrtle Square Condos

Dilworth Historic Area

Drainage Area Outfall

Arlington CondosFlooded Parking Deck

Low Areas

Page 8: “Pushing the Limits of Constructability Pushes the Limits of ......“Pushing the Limits of Constructability Pushes the Limits of Stakeholder Involvement” Case Study: Myrtle-Morehead

Project Study Area – Urban & Residential

McDowell Avenue Oriole Avenue

Page 9: “Pushing the Limits of Constructability Pushes the Limits of ......“Pushing the Limits of Constructability Pushes the Limits of Stakeholder Involvement” Case Study: Myrtle-Morehead

Project Study Area -Residential

Myrtle Avenue

Lexington Avenue

• Narrow Tree Lined Streets

• OH Utilities• On-Street Parking

Page 10: “Pushing the Limits of Constructability Pushes the Limits of ......“Pushing the Limits of Constructability Pushes the Limits of Stakeholder Involvement” Case Study: Myrtle-Morehead

Project Study Area - Residential

Myrtle Square Condominiums

Low Area

Existing Culvert in Courtyard

Page 11: “Pushing the Limits of Constructability Pushes the Limits of ......“Pushing the Limits of Constructability Pushes the Limits of Stakeholder Involvement” Case Study: Myrtle-Morehead

Project Study Area - Residential

Euclid Avenue “Sump”

Page 12: “Pushing the Limits of Constructability Pushes the Limits of ......“Pushing the Limits of Constructability Pushes the Limits of Stakeholder Involvement” Case Study: Myrtle-Morehead

Alternatives Considered

• Rehabilitation of Existing System– Results in Less than 2 Year LOS

• Upstream Detention for 10 Year LOS– Required 37 Ac-Ft of Storage

• Numerous Alignments• Other Potential Solutions

– Linear Storage– Storm Water Pump Station

Page 13: “Pushing the Limits of Constructability Pushes the Limits of ......“Pushing the Limits of Constructability Pushes the Limits of Stakeholder Involvement” Case Study: Myrtle-Morehead

Alternatives Considered

Charlotte Housing Authority

Alternative AlignmentsCharlotte Housing

Authority

37 Ac-FtPond

Page 14: “Pushing the Limits of Constructability Pushes the Limits of ......“Pushing the Limits of Constructability Pushes the Limits of Stakeholder Involvement” Case Study: Myrtle-Morehead

Project Design & Constructability Challenges

• Routing a 78” to 90” by-pass culvert through the Dilworth neighborhood streets at depths between 20 and 30 feet

• Tunneling under Morehead Street and replacing 80’ of the 54” water main (NCDOT Encroachment)

• Installing 90” culvert by open cut in McDowell Street (NCDOT Encroachment)

• Installing box culvert by open cut through the front parking lot of a Public Relations firm

Results in a monumental challenge of project planning & stakeholder involvement !

Page 15: “Pushing the Limits of Constructability Pushes the Limits of ......“Pushing the Limits of Constructability Pushes the Limits of Stakeholder Involvement” Case Study: Myrtle-Morehead

Impact of Constructability Challenges on Construction Costs

• Only 2 Bidders: $12.15M & $13.04M

• 150 LF of Tunnel 30 feet deep : $3.15M• Sheeting and Shoring for Deep Open Cut: $600K• Contaminated Soils and Groundwater: $520K• 80 LF 54-inch Water Main Replacement: $300K• Slow construction – 18 months for 1,400 LF : $7.58M

Page 16: “Pushing the Limits of Constructability Pushes the Limits of ......“Pushing the Limits of Constructability Pushes the Limits of Stakeholder Involvement” Case Study: Myrtle-Morehead

Phase 1 – Under Construction

Wray WardWray Ward

Wray WardWray WardWray Ward

Wray Ward

Dialysis Center

Duke Endowment HQ

Arts BBQ

Townhouses

Presenter
Presentation Notes
Describe Open cut and tunnel location, and tunnel skew
Page 17: “Pushing the Limits of Constructability Pushes the Limits of ......“Pushing the Limits of Constructability Pushes the Limits of Stakeholder Involvement” Case Study: Myrtle-Morehead

Stakeholders• Property Owner and

Businesses• Charlotte Water – 54-

inch WM Replacement and sewer relocation

• CDOT - Multiphase Traffic Control Plans

• Department of Water Quality

• Duke Energy • AT&T – Duct Bank

Crossing• Piedmont Natural Gas –

Existing & Abandoned Gas Mains

• NCDOT – Encroachment Permit & Design Approval

Page 18: “Pushing the Limits of Constructability Pushes the Limits of ......“Pushing the Limits of Constructability Pushes the Limits of Stakeholder Involvement” Case Study: Myrtle-Morehead

Wray Ward

Existing 9’x6’ RCBC

New 10’x6’ RCBC Adjacent to Existing 9’x6’ RCBC

Existing 9’x6’ RCBC removed to install 2-9’x6’ RCBCs

Existing 9’x6’ RCBC

Duke Energy OH Transmission Line

Duke & AT&T Duct Banks

Presenter
Presentation Notes
1st problem area, Spend time explaining sequence and constraints
Page 19: “Pushing the Limits of Constructability Pushes the Limits of ......“Pushing the Limits of Constructability Pushes the Limits of Stakeholder Involvement” Case Study: Myrtle-Morehead
Page 20: “Pushing the Limits of Constructability Pushes the Limits of ......“Pushing the Limits of Constructability Pushes the Limits of Stakeholder Involvement” Case Study: Myrtle-Morehead

New 10’x6’ RCBC Connection @ Sta. 0+00

Page 21: “Pushing the Limits of Constructability Pushes the Limits of ......“Pushing the Limits of Constructability Pushes the Limits of Stakeholder Involvement” Case Study: Myrtle-Morehead

Duke Energy OH Transmission Line Tower

Page 22: “Pushing the Limits of Constructability Pushes the Limits of ......“Pushing the Limits of Constructability Pushes the Limits of Stakeholder Involvement” Case Study: Myrtle-Morehead

Required Nighttime/Weekend Work

Page 23: “Pushing the Limits of Constructability Pushes the Limits of ......“Pushing the Limits of Constructability Pushes the Limits of Stakeholder Involvement” Case Study: Myrtle-Morehead

Wray Ward

Existing 9’x6’ RCBC

New 10’x6’ RCBC Adjacent to Existing 9’x6’ RCBC

Existing 9’x6’ RCBC removed to install 2-9’x6’ RCBCs

Existing 9’x6’ RCBC

Duke Energy OH Transmission Line

Duke & AT&T Duct Banks

Page 24: “Pushing the Limits of Constructability Pushes the Limits of ......“Pushing the Limits of Constructability Pushes the Limits of Stakeholder Involvement” Case Study: Myrtle-Morehead

Duke Energy Duct Bank Crossing

Presenter
Presentation Notes
Talk about soft digs did not discover small duct bank under neath
Page 25: “Pushing the Limits of Constructability Pushes the Limits of ......“Pushing the Limits of Constructability Pushes the Limits of Stakeholder Involvement” Case Study: Myrtle-Morehead

McDowell Street Junction Box

New Culvert C/L

Page 26: “Pushing the Limits of Constructability Pushes the Limits of ......“Pushing the Limits of Constructability Pushes the Limits of Stakeholder Involvement” Case Study: Myrtle-Morehead

12’ x 12’ Junction Box

9’x6’ Downstream

90” Upstream

Presenter
Presentation Notes
Middle of McDowell, NCDOT involvement
Page 27: “Pushing the Limits of Constructability Pushes the Limits of ......“Pushing the Limits of Constructability Pushes the Limits of Stakeholder Involvement” Case Study: Myrtle-Morehead

McDowell Street

New Culvert C/L

Page 28: “Pushing the Limits of Constructability Pushes the Limits of ......“Pushing the Limits of Constructability Pushes the Limits of Stakeholder Involvement” Case Study: Myrtle-Morehead

Oh No ! Another Utility Coordination

New Fiber Optic Line

Page 29: “Pushing the Limits of Constructability Pushes the Limits of ......“Pushing the Limits of Constructability Pushes the Limits of Stakeholder Involvement” Case Study: Myrtle-Morehead

McDowell Street – Parking Garage Entrance

Page 30: “Pushing the Limits of Constructability Pushes the Limits of ......“Pushing the Limits of Constructability Pushes the Limits of Stakeholder Involvement” Case Study: Myrtle-Morehead

McDowell Street – Parking Garage Entrance

Page 31: “Pushing the Limits of Constructability Pushes the Limits of ......“Pushing the Limits of Constructability Pushes the Limits of Stakeholder Involvement” Case Study: Myrtle-Morehead

Tunneling & Water Main Replacement

No Blasting within 10 feet of Water MainTunneling Stopped for W.M Replacement

WM Replacement Between Dec. and March

NCDOT Encroachment

Tunnel Location

Page 32: “Pushing the Limits of Constructability Pushes the Limits of ......“Pushing the Limits of Constructability Pushes the Limits of Stakeholder Involvement” Case Study: Myrtle-Morehead

12’ SEM Tunnel

Presenter
Presentation Notes
Describe SEM; Mention SEM tunnel 2’ below 54” water main required replacement to prevent settlement
Page 33: “Pushing the Limits of Constructability Pushes the Limits of ......“Pushing the Limits of Constructability Pushes the Limits of Stakeholder Involvement” Case Study: Myrtle-Morehead

54-Inch Water Main Replacement

Presenter
Presentation Notes
Open cut shoring with tunnel 10 feet away
Page 34: “Pushing the Limits of Constructability Pushes the Limits of ......“Pushing the Limits of Constructability Pushes the Limits of Stakeholder Involvement” Case Study: Myrtle-Morehead

54-Inch Water Main Replacement

Presenter
Presentation Notes
New ductile iron water main
Page 35: “Pushing the Limits of Constructability Pushes the Limits of ......“Pushing the Limits of Constructability Pushes the Limits of Stakeholder Involvement” Case Study: Myrtle-Morehead

Duke Endowment, Arts BBQ, H&R Block

Arts BBQ

Duke Endowment HQ & Parking Garage

Tunnel Shaft ~ 33 Feet Deep

Only Access

Add H&ROriole Ave issues

H&R Block

Presenter
Presentation Notes
Closed 1 of Arts driveways; re-arranged parking spaces; impacts to H&R block during tax season; construction traffic
Page 36: “Pushing the Limits of Constructability Pushes the Limits of ......“Pushing the Limits of Constructability Pushes the Limits of Stakeholder Involvement” Case Study: Myrtle-Morehead

Duke Endowment; Arts BBQ; & H&R Block

Presenter
Presentation Notes
Describe Duke, Arts, H&R Blocl
Page 37: “Pushing the Limits of Constructability Pushes the Limits of ......“Pushing the Limits of Constructability Pushes the Limits of Stakeholder Involvement” Case Study: Myrtle-Morehead

Duke Endowment; Arts BBQ; & H&R Block

Page 38: “Pushing the Limits of Constructability Pushes the Limits of ......“Pushing the Limits of Constructability Pushes the Limits of Stakeholder Involvement” Case Study: Myrtle-Morehead

Duke Endowment; Arts BBQ; & H&R Block

Page 39: “Pushing the Limits of Constructability Pushes the Limits of ......“Pushing the Limits of Constructability Pushes the Limits of Stakeholder Involvement” Case Study: Myrtle-Morehead

Phase 2 – Final Design

Myrtle Square Apts

New Apts

CHA Redevelopment

90-Inch Pipe ~ 30 Feet Deep

78-Inch Pipe ~ 25 Feet Deep

InterconnectionsMain Driveway

Location Based on Preliminary Re-Development Plans

Page 40: “Pushing the Limits of Constructability Pushes the Limits of ......“Pushing the Limits of Constructability Pushes the Limits of Stakeholder Involvement” Case Study: Myrtle-Morehead

Phase 2 –Sequence of Construction Prior to 90” & 78” Pipe Installation

1. Relocate Existing Private Utilities to New Location

2. Remove and Replace Existing Sanitary Sewer Mains in conflict with 90” & 78” Pipe

3. Re-instate Sewer Service Laterals to maintain sewer service during construction

4. Install temporary water main to remove existing water main in conflict with 90” & 78” Pipe

Page 41: “Pushing the Limits of Constructability Pushes the Limits of ......“Pushing the Limits of Constructability Pushes the Limits of Stakeholder Involvement” Case Study: Myrtle-Morehead

Stakeholders

• Property Owners and Businesses• Duke Energy – Overhead Power Service• Cable TV & Telephone – Overhead Serve• Piedmont Natural Gas – Existing & Abandoned

Gas Mains• Charlotte Water – Water and Sewer Service to

Customers• CDOT - Traffic Control Plans

Page 42: “Pushing the Limits of Constructability Pushes the Limits of ......“Pushing the Limits of Constructability Pushes the Limits of Stakeholder Involvement” Case Study: Myrtle-Morehead

Phase 2 –Sequence of Construction For 90” & 78” Pipe Installation

1. Setup 200’ max road closure2. Trim tree branches to prevent damage3. Install “active” shoring for open cut installation4. Install 90” & 78” Pipe, MH’s, and Street Drainage5. Install Temporary Pavement Restoration6. At Completion of City Block – Install New Water

System and Final Pavement Restoration

Page 43: “Pushing the Limits of Constructability Pushes the Limits of ......“Pushing the Limits of Constructability Pushes the Limits of Stakeholder Involvement” Case Study: Myrtle-Morehead

Lessons Learned1. Improve Bid Advertising for Phase 2

– Increase Number of Bidders2. Additional Construction Location Restrictions

– Oriole Street Started Earlier Than Expected– Construction Vehicle Parking, Material Deliveries

3. Stakeholder Involvement Increases During Construction– Significant Utility Coordination During Design – “Tip of Iceberg”– Property Owner Coordination - Unrealistic Requests– Day-to –Day Activities – Garbage Collection; Mail Delivery

4. Costs of “Handcuffing” Contractor– Unrealistic weekend closures

All These Lessons Learned Will Be Applied to Phase 2 !We Are Confident There Will Be Others to Overcome !

Page 44: “Pushing the Limits of Constructability Pushes the Limits of ......“Pushing the Limits of Constructability Pushes the Limits of Stakeholder Involvement” Case Study: Myrtle-Morehead

Questions ??