A N A L I S A B I A Y A P E K E R J A A N
KODEINDEX U R A I A N HARGA SATUAN JUMLAH HARGA JUMLAH TOTAL
ANALISA
A. 001 1 BUAH PAPAN NAMA PROYEK
MATERIAL :
0.020 M3 Kayu kaso 5/7 Rp. 2,000,000.00 Rp. 40,000.00
0.200 Paku biasa 2" - 5" Rp. 10,350.00 Rp. 2,070.00
0.460 Cat Kayu Rp. 34,500.00 Rp. 15,870.00
1.500 Kayu dolken dia 8-10/4m Rp. 34,500.00 Rp. 51,750.00
0.360 Triplek Rp. 40,250.00 Rp. 14,490.00 Rp. 124,180.00
PEKERJA :
0.200 HOK Pekerja Rp. 30,000.00 Rp. 6,000.00
0.600 HOK Tukang Rp. 40,000.00 Rp. 24,000.00
0.060 HOK Mandor 45,000.00 Rp. 2,700.00
1.000 LS Upah Penulisan Rp. 75,000.00 Rp. 75,000.00 Rp. 107,700.00
JUMLAH Rp. 231,880.00
PEMBULATAN : Rp. 231,800.00
ABK.100.04 1 M2 MEMBERSIHKAN LAPANGAN DAN PEMERATAAN
PEKERJA :
0.100 HOK Pekerja Rp. 30,000.00 Rp. 3,000.00
0.050 HOK Mandor Rp. 45,000.00 Rp. 2,250.00 Rp. 5,250.00
JUMLAH Rp. 5,250.00
PEMBULATAN : Rp. 5,200.00
ABK.100.05 1 M2 PENGUKURAN DAN PAMASANGAN BOUWPLANK / PROFIL
MATERIAL :
0.012 M3 Kayu kaso Rp. 1,600,000.00 Rp. 19,200.00
0.007 M3 Kayu papan 3/20 Rp. 1,600,000.00 Rp. 11,200.00
0.020 KG Paku biasa 2" - 5" Rp. 10,350.00 Rp. 207.00 Rp. 30,607.00
PEKERJA :
0.100 HOK Pekerja Rp. 30,000.00 Rp. 3,000.00
0.100 HOK Tukang Rp. 40,000.00 Rp. 4,000.00
0.005 HOK Mandor Rp. 45,000.00 Rp. 225.00 Rp. 7,225.00
JUMLAH Rp. 37,832.00
PEMBULATAN : Rp. 37,800.00
K. 705.rob 1 M3 BONGKARAN PASANGAN LAMA
PEKERJA :
2.000 HOK Pekerja Rp. 30,000.00 Rp. 60,000.00
0.100 HOK Mandor Rp. 45,000.00 Rp. 4,500.00
0.500 Set Alat Bantu Rp. 50,000.00 Rp. 25,000.00
JUMLAH Rp. 89,500.00
PEMBULATAN : Rp. 89,500.00
ABK.200.01 1 M3 GALIAN TANAH BIASA
PEKERJA :
0.400 HOK Pekerja Rp. 30,000.00 Rp. 12,000.00
0.040 HOK Mandor Rp. 45,000.00 Rp. 1,800.00 Rp. 13,800.00
JUMLAH Rp. 13,800.00
PEMBULATAN : Rp. 13,800.00
A. 002 1 M3 GALIAN TANAH BERBATU
PEKERJA :
1.500 HOK Pekerja Rp. 30,000.00 Rp. 45,000.00
0.050 HOK Mandor Rp. 45,000.00 Rp. 2,250.00 Rp. 47,250.00
JUMLAH Rp. 47,250.00
PEMBULATAN : Rp. 47,200.00
A. 004 1 M3 GALIAN TANAH BERLUMPUR
PEKERJA :
1.500 HOK Pekerja Rp. 30,000.00 Rp. 45,000.00
0.050 HOK Mandor Rp. 45,000.00 Rp. 2,250.00 Rp. 47,250.00
JUMLAH Rp. 47,250.00
PEMBULATAN : Rp. 47,200.00
A N A L I S A B I A Y A P E K E R J A A N
KODEINDEX U R A I A N HARGA SATUAN JUMLAH HARGA JUMLAH TOTAL
ANALISA
ABK.200.09 1 M3 TIMBUNAN KEMBALI BEKAS GALIAN
PEKERJA :
0.192 HOK Pekerja Rp. 30,000.00 Rp. 5,760.00
0.019 HOK Mandor Rp. 45,000.00 Rp. 855.00 Rp. 6,615.00
JUMLAH Rp. 6,615.00
PEMBULATAN : Rp. 6,600.00
ABK.200.10 1 M3 PEMADATAN TANAH
PEKERJA :
0.500 HOK Pekerja Rp. 30,000.00 Rp. 15,000.00
0.050 HOK Mandor Rp. 45,000.00 Rp. 2,250.00 Rp. 17,250.00
JUMLAH Rp. 17,250.00
PEMBULATAN : Rp. 17,200.00
ABK.200.11 1 M3 URUGAN PASIR
MATERIAL :
1.200 M3 Pasir Urug Rp. 50,000.00 Rp. 60,000.00 Rp. 60,000.00
PEKERJA :
0.300 HOK Pekerja Rp. 30,000.00 Rp. 9,000.00
0.010 HOK Mandor Rp. 45,000.00 Rp. 450.00 Rp. 9,450.00
JUMLAH Rp. 69,450.00
PEMBULATAN : Rp. 69,400.00
ABK.200.12 1 M3 URUGAN TANAH
MATERIAL :
1.200 M3 Tanah atras Rp. 55,000.00 Rp. 66,000.00 Rp. 66,000.00
PEKERJA :
0.300 HOK Pekerja Rp. 30,000.00 Rp. 9,000.00
0.010 HOK Mandor Rp. 45,000.00 Rp. 450.00 Rp. 9,450.00
JUMLAH Rp. 75,450.00
PEMBULATAN : Rp. 75,400.00
ABK.250.06 1 M3 PASANGAN PONDASI BATU BELAH AD. 1 : 4
MATERIAL :
1.100 M3 Batu belah 15/20 cm Rp. 82,000.00 Rp. 90,200.00
3.260 ZAK Semen portland Rp. 40,000.00 Rp. 130,400.00
0.520 M3 Pasir pasang Rp. 65,000.00 Rp. 33,800.00 Rp. 254,400.00
PEKERJA :
1.500 HOK Pekerja Rp. 30,000.00 Rp. 45,000.00
0.600 HOK Tukang Rp. 40,000.00 Rp. 24,000.00
0.075 HOK Mandor Rp. 45,000.00 Rp. 3,375.00 Rp. 72,375.00
JUMLAH Rp. 326,775.00
PEMBULATAN : Rp. 326,700.00
ABK.250.07 1 M3 PASANGAN PONDASI BATU BELAH AD. 1 : 5
MATERIAL :
1.100 M3 Batu belah 15/20 cm Rp. 82,000.00 Rp. 90,200.00
2.720 ZAK Semen portland Rp. 40,000.00 Rp. 108,800.00
0.544 M3 Pasir pasang Rp. 65,000.00 Rp. 35,360.00 Rp. 234,360.00
PEKERJA :
1.500 HOK Pekerja Rp. 30,000.00 Rp. 45,000.00
0.600 HOK Tukang Rp. 40,000.00 Rp. 24,000.00
0.075 HOK Mandor Rp. 45,000.00 Rp. 3,375.00 Rp. 72,375.00
JUMLAH Rp. 306,735.00
PEMBULATAN : Rp. 306,700.00
ABK.250.14 1 M3 PASANGAN BATU KOSONG
MATERIAL :
1.200 M3 Batu belah 10/15 cm Rp. 82,000.00 Rp. 98,400.00
0.300 M3 Pasir urug Rp. 52,000.00 Rp. 15,600.00 Rp. 114,000.00
PEKERJA :
0.780 HOK Pekerja Rp. 30,000.00 Rp. 23,400.00
0.390 HOK Tukang Rp. 40,000.00 Rp. 15,600.00
0.039 HOK Mandor Rp. 45,000.00 Rp. 1,755.00 Rp. 40,755.00
JUMLAH Rp. 154,755.00
PEMBULATAN : Rp. 154,700.00
A N A L I S A B I A Y A P E K E R J A A N
KODEINDEX U R A I A N HARGA SATUAN JUMLAH HARGA JUMLAH TOTAL
ANALISA
ABK.300.08 1 M3 MEMBUAT BETON TUMBUK AD. 1 : 3 : 6 TEBAL = 5 CM
MATERIAL :
3.940 ZAK Semen portland Rp. 40,000.00 Rp. 157,600.00
0.470 M3 Pasi beton Rp. 103,000.00 Rp. 48,410.00
0.940 M3 Kerikil Rp. 57,000.00 Rp. 53,580.00 Rp. 259,590.00
PEKERJA :
1.650 HOK Pekerja Rp. 30,000.00 Rp. 49,500.00
0.250 HOK Tukang Rp. 40,000.00 Rp. 10,000.00
0.080 HOK Mandor Rp. 45,000.00 Rp. 3,600.00 Rp. 63,100.00
JUMLAH Rp. 322,690.00
PEMBULATAN : Rp. 322,600.00
ABK.300.19 1 M3 BETON NON BERTULANG AD. 1 : 2 : 3
MATERIAL :
4.640 ZAK Semen portland Rp. 40,000.00 Rp. 185,600.00
0.520 M3 Besi beton Rp. 103,000.00 Rp. 53,560.00
0.780 M3 Spleet 2/3 cm Rp. 113,000.00 Rp. 88,140.00 Rp. 327,300.00
PEKERJA :
1.650 HOK Pekerja Rp. 30,000.00 Rp. 49,500.00
0.250 HOK Tukang Rp. 40,000.00 Rp. 10,000.00
0.080 HOK Mandor Rp. 45,000.00 Rp. 3,600.00 Rp. 63,100.00
JUMLAH Rp. 390,400.00
PEMBULATAN : Rp. 390,400.00
ABK.300.32 1 KG PEMBESIAN DENGAN BESI POLOS ATAU BESI ULIR
MATERIAL :
1.050 KG Besi beton Rp. 7,750.00 Rp. 8,137.50
0.015 M3 Kawat beton Rp. 9,000.00 Rp. 135.00 Rp. 8,272.50
PEKERJA :
0.007 HOK Pekerja Rp. 30,000.00 Rp. 210.00
0.007 HOK Tukang Rp. 40,000.00 Rp. 280.00
0.0003 HOK Mandor Rp. 45,000.00 Rp. 13.50 Rp. 503.50
JUMLAH Rp. 8,776.00
PEMBULATAN : Rp. 8,700.00
ABK.300.35 1 M2 PASANG BEKISTING UNTUK PONDASI
MATERIAL :
0.040 M3 Kayu papan/kaso Rp. 1,600,000.00 Rp. 64,000.00
0.300 KG Paku biasa 2" - 5" Rp. 10,350.00 Rp. 3,105.00
0.100 LTR Pelumas bekisting Rp. 10,000.00 Rp. 1,000.00 Rp. 68,105.00
PEKERJA :
0.300 HOK Pekerja Rp. 30,000.00 Rp. 9,000.00
0.260 HOK Tukang Rp. 40,000.00 Rp. 10,400.00
0.005 HOK Mandor Rp. 45,000.00 Rp. 225.00 Rp. 19,625.00
JUMLAH Rp. 87,730.00
PEMBULATAN : Rp. 87,700.00
ABK.300.36 1 M2 PASANG BEKISTING UNTUK SLOOP, KOLOM BIASA & RING BALK
MATERIAL :
0.045 M3 Kayu papan/kaso Rp. 1,600,000.00 Rp. 72,000.00
0.300 KG Paku biasa 2" - 5" Rp. 10,350.00 Rp. 3,105.00
0.100 LTR Pelumas bekisting Rp. 10,000.00 Rp. 1,000.00 Rp. 76,105.00
PEKERJA :
0.300 HOK Pekerja Rp. 30,000.00 Rp. 9,000.00
0.260 HOK Tukang Rp. 40,000.00 Rp. 10,400.00
0.005 HOK Mandor Rp. 45,000.00 Rp. 225.00 Rp. 19,625.00
JUMLAH Rp. 95,730.00
PEMBULATAN : Rp. 95,700.00
A N A L I S A B I A Y A P E K E R J A A N
KODEINDEX U R A I A N HARGA SATUAN JUMLAH HARGA JUMLAH TOTAL
ANALISA
ABK.300.37 1 M2 PASANG BEKISTING UNTUK KOLOM STRUKTUR
MATERIAL :
0.040 M3 Kayu papan/kaso Rp. 1,600,000.00 Rp. 64,000.00
0.015 M3 Balok kayu hutan Rp. 1,600,000.00 Rp. 24,000.00
0.400 KG Paku biasa 2" - 5" Rp. 10,350.00 Rp. 4,140.00
0.200 LTR Pelumas bekisting Rp. 10,000.00 Rp. 2,000.00
0.350 LTR Triplek tebal 9 mm Rp. 86,825.00 Rp. 30,388.75
2.000 BTG Dolken kayu ø 8 - 10/4 m' Rp. 34,500.00 Rp. 69,000.00 Rp. 193,528.75
PEKERJA :
0.300 HOK Pekerja Rp. 30,000.00 Rp. 9,000.00
0.330 HOK Tukang Rp. 40,000.00 Rp. 13,200.00
0.006 HOK Mandor Rp. 45,000.00 Rp. 270.00 Rp. 22,470.00
JUMLAH Rp. 215,998.75
PEMBULATAN : Rp. 215,900.00
ABK.300.38 1 M2 PASANG BEKISTING UNTUK BALOK
MATERIAL :
0.040 M3 Kayu papan/kaso Rp. 1,600,000.00 Rp. 64,000.00
0.018 M3 Balok kayu hutan Rp. 1,600,000.00 Rp. 28,800.00
0.400 KG Paku biasa 2" - 5" Rp. 10,350.00 Rp. 4,140.00
0.200 LTR Pelumas bekisting Rp. 10,000.00 Rp. 2,000.00
0.350 LTR Triplek tebal 9 mm Rp. 78,000.00 Rp. 27,300.00
2.000 BTG Dolken kayu ø 8 - 10/4 m' Rp. 34,500.00 Rp. 69,000.00 Rp. 195,240.00
PEKERJA :
0.320 HOK Pekerja Rp. 30,000.00 Rp. 9,600.00
0.330 HOK Tukang Rp. 40,000.00 Rp. 13,200.00
0.006 HOK Mandor Rp. 45,000.00 Rp. 270.00 Rp. 23,070.00
JUMLAH Rp. 218,310.00
PEMBULATAN : Rp. 218,300.00
ABK.350.12 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA AD. 1 : 4
MATERIAL :
70.000 BH Bata Merah Rp. 290.00 Rp. 20,300.00
0.230 ZAK Semen Portland Rp. 40,000.00 Rp. 9,200.00
0.043 M3 Pasir Pasang Rp. 65,000.00 Rp. 2,795.00 Rp. 32,295.00
PEKERJA :
0.320 HOK Pekerja Rp. 30,000.00 Rp. 9,600.00
0.100 HOK Tukang Rp. 40,000.00 Rp. 4,000.00
0.015 HOK Mandor Rp. 45,000.00 Rp. 675.00 Rp. 14,275.00
JUMLAH Rp. 46,570.00
PEMBULATAN : Rp. 46,500.00
AN. G. 33 H 1 M3 PASANGAN BATA MERAH TEBAL 1/2 BATA AD. 1 : 4
MATERIAL :
475 BH Bata Merah Rp. 290.00 Rp. 137,750.00
3.166 ZAK Semen Portland Rp. 40,000.00 Rp. 126,652.00
0.406 M3 Pasir Pasang Rp. 65,000.00 Rp. 26,390.00 Rp. 290,792.00
PEKERJA :
4.500 HOK Pekerja Rp. 30,000.00 Rp. 135,000.00
1.500 HOK Tukang Rp. 40,000.00 Rp. 60,000.00
0.225 HOK Mandor Rp. 45,000.00 Rp. 10,125.00 Rp. 205,125.00
JUMLAH Rp. 495,917.00
PEMBULATAN : Rp. 495,900.00
ABK.360.04 1 M2 PLESTERAN AD. 1:4 TEBAL = 15 MM
MATERIAL :
0.104 ZAK Semen Portland Rp. 40,000.00 Rp. 4,160.00
0.020 M3 Pasir Pasang Rp. 65,000.00 Rp. 1,300.00 Rp. 5,460.00
PEKERJA :
0.200 HOK Pekerja Rp. 30,000.00 Rp. 6,000.00
0.150 HOK Tukang Rp. 40,000.00 Rp. 6,000.00
0.010 HOK Mandor Rp. 45,000.00 Rp. 450.00 Rp. 12,450.00
JUMLAH Rp. 17,910.00
PEMBULATAN : Rp. 17,900.00
A N A L I S A B I A Y A P E K E R J A A N
KODEINDEX U R A I A N HARGA SATUAN JUMLAH HARGA JUMLAH TOTAL
ANALISA
A. 051 1 M2 SIARAN AD. 1 : 2
MATERIAL :
0.1054 ZAK Semen Portland Rp. 40,000.00 Rp. 4,216.00
0.0085 M3 Pasir Pasang Rp. 65,000.00 Rp. 552.50 Rp. 4,768.50
PEKERJA :
0.3600 HOK Pekerja Rp. 30,000.00 Rp. 10,800.00
0.1200 HOK Tukang Rp. 40,000.00 Rp. 4,800.00
0.0180 HOK Mandor Rp. 45,000.00 Rp. 810.00 Rp. 16,410.00
JUMLAH Rp. 21,178.50
PEMBULATAN : Rp. 21,100.00
ABK.450.33 1 M2 MEMBUAT RANGKA LANGIT - LANGIT 1 x 1 M.
MATERIAL :
0.012 M3 Kayu Rp. 2,000,000.00 Rp. 24,000.00
0.100 KG Paku Biasa 2" - 5" Rp. 10,350.00 Rp. 1,035.00 Rp. 25,035.00
PEKERJA :
0.150 HOK Pekerja Rp. 30,000.00 Rp. 4,500.00
0.250 HOK Tukang Rp. 40,000.00 Rp. 10,000.00
0.075 HOK Mandor Rp. 45,000.00 Rp. 3,375.00 Rp. 17,875.00
JUMLAH Rp. 42,910.00
PEMBULATAN : Rp. 42,900.00
ABK.451.34 1 M2 PASANG LISTPLANK 3 X 20 CM
MATERIAL :
0.0072 M3 Papan Kayu Rp. 2,000,000.00 Rp. 14,400.00
0.050 KG Paku Biasa 2" - 5" Rp. 10,350.00 Rp. 517.50 Rp. 14,917.50
PEKERJA :
0.100 HOK Pekerja Rp. 30,000.00 Rp. 3,000.00
0.200 HOK Tukang Rp. 40,000.00 Rp. 8,000.00
0.005 HOK Mandor Rp. 45,000.00 Rp. 225.00 Rp. 11,225.00
JUMLAH Rp. 26,142.50
PEMBULATAN : Rp. 26,100.00
ABK.452.35 1 M' PASANG LIST KAYU PROFIL
MATERIAL :
1 M' List Kayu Rp. 2,250.00 Rp. 2,250.00
0.050 ZAK Paku Biasa 1/2" - 1" Rp. 11,500.00 Rp. 575.00 Rp. 2,825.00
PEKERJA :
0.030 HOK Pekerja Rp. 30,000.00 Rp. 900.00
0.070 HOK Tukang Rp. 40,000.00 Rp. 2,800.00
0.002 HOK Mandor Rp. 45,000.00 Rp. 90.00 Rp. 3,790.00
JUMLAH Rp. 6,615.00
PEMBULATAN : Rp. 6,600.00
ABK.460.01 1 M2 ATAP GENTENG PRESS TANGAN
MATERIAL :
25 BH Genteng Rp. 800.00 Rp. 20,000.00 Rp. 20,000.00
PEKERJA :
0.150 HOK Pekerja Rp. 30,000.00 Rp. 4,500.00
0.075 HOK Tukang Rp. 40,000.00 Rp. 3,000.00
0.008 HOK Mandor Rp. 45,000.00 Rp. 360.00 Rp. 7,860.00
JUMLAH Rp. 27,860.00
PEMBULATAN : Rp. 27,800.00
ABK. 460.17 1 M' PASANG NOK BUBUNG GENTENG
MATERIAL :
3.5 BH Nok bubung genteng Rp. 4,300.00 Rp. 15,050.00
0.050 BH Paku Biasa 2" - 5" Rp. 10,350.00 Rp. 517.50
0.2 ZAK Semen Portland Rp. 40,000.00 Rp. 8,640.00
0.032 M3 Pasir Pasang Rp. 65,000.00 Rp. 2,080.00
1 KG Semen warna Rp. 3,450.00 Rp. 3,450.00 Rp. 29,737.50
PEKERJA :
0.400 HOK Pekerja Rp. 30,000.00 Rp. 12,000.00
0.200 HOK Tukang Rp. 40,000.00 Rp. 8,000.00
0.020 HOK Mandor Rp. 45,000.00 Rp. 900.00 Rp. 20,900.00
JUMLAH Rp. 50,637.50
PEMBULATAN : Rp. 50,600.00
A N A L I S A B I A Y A P E K E R J A A N
KODEINDEX U R A I A N HARGA SATUAN JUMLAH HARGA JUMLAH TOTAL
ANALISA
ABK.470.02 1 M2 LANGIT-LANGIT ETERNIT 1 x 1 M, TEBAL 5 MM
MATERIAL :
1.1 Lbr Eternit tebal 5 mm Rp. 5,000.00 Rp. 5,500.00
0.010 KG Paku Biasa 1/2" - 1" Rp. 11,500.00 Rp. 115.00 Rp. 5,615.00
PEKERJA :
0.030 HOK Pekerja Rp. 30,000.00 Rp. 900.00
0.070 HOK Tukang Rp. 40,000.00 Rp. 2,800.00
0.0015 HOK Mandor Rp. 45,000.00 Rp. 67.50 Rp. 3,767.50
JUMLAH Rp. 9,382.50
PEMBULATAN : Rp. 9,300.00
ABK. 550.02 1 BUAH PASANG CLOSET JONGKOK PORSELIN
MATERIAL :
1 BH Closet jongkok merk Ina Rp. 75,000.00 Rp. 75,000.00
7 BH Batu bata merah Rp. 290.00 Rp. 2,030.00
0.12 ZAK Semen Portland Rp. 40,000.00 Rp. 4,800.00
0.010 M3 Pasir pasang Rp. 65,000.00 Rp. 650.00 Rp. 82,480.00
PEKERJA :
1.000 HOK Pekerja Rp. 30,000.00 Rp. 30,000.00
1.500 HOK Tukang Rp. 40,000.00 Rp. 60,000.00
0.110 HOK Mandor Rp. 45,000.00 Rp. 4,950.00 Rp. 94,950.00
JUMLAH Rp. 177,430.00
PEMBULATAN : Rp. 177,400.00
ABK. 550.06 1 BUAH PASANG BAK MANDI KERAMIK VOL. 0,30 M3
MATERIAL :
1 BH Bak Mandi Keramik Rp. 90,000.00 Rp. 90,000.00
0.12 ZAK Semen Portland Rp. 40,000.00 Rp. 4,800.00
0.010 M3 Pasir pasang Rp. 65,000.00 Rp. 650.00 Rp. 95,450.00
PEKERJA :
2.100 HOK Pekerja Rp. 30,000.00 Rp. 63,000.00
0.750 HOK Tukang Rp. 40,000.00 Rp. 30,000.00
0.110 HOK Mandor Rp. 45,000.00 Rp. 4,950.00 Rp. 97,950.00
JUMLAH Rp. 193,400.00
PEMBULATAN : Rp. 193,400.00
ABK. 650.03 1 M2 PASANG LANTAI UBIN PC ABU-ABU 20 x 20 CM
MATERIAL :
25 BH Ubin abu-abu 20 x 20 cm Rp. 600.00 Rp. 15,000.00
0.21 ZAK Semen Portland Rp. 40,000.00 Rp. 8,320.00
0.0135 M3 Pasir pasang Rp. 65,000.00 Rp. 877.50 Rp. 24,197.50
PEKERJA :
0.270 HOK Pekerja Rp. 30,000.00 Rp. 8,100.00
0.130 HOK Tukang Rp. 40,000.00 Rp. 5,200.00
0.0135 HOK Mandor Rp. 45,000.00 Rp. 607.50 Rp. 13,907.50
JUMLAH Rp. 38,105.00
PEMBULATAN : Rp. 38,100.00
ABK. 850.02 1 BUAH PASANG KUNCI PINTU
MATERIAL :
1 BH Kunci tanam pintu Rp. 40,000.00 Rp. 40,000.00 Rp. 40,000.00
PEKERJA :
0.015 HOK Pekerja Rp. 30,000.00 Rp. 450.00
0.150 HOK Tukang Rp. 40,000.00 Rp. 6,000.00
0.00075 HOK Mandor Rp. 45,000.00 Rp. 33.75 Rp. 6,483.75
JUMLAH Rp. 46,483.75
PEMBULATAN : Rp. 46,400.00
ABK. 850.05 1 SET PASANG ENGSEL UNTUK PINTU
MATERIAL :
1 BH Engsel pintu Rp. 6,900.00 Rp. 6,900.00 Rp. 6,900.00
PEKERJA :
0.015 HOK Pekerja Rp. 30,000.00 Rp. 450.00
0.150 HOK Tukang Rp. 40,000.00 Rp. 6,000.00
0.00075 HOK Mandor Rp. 45,000.00 Rp. 33.75 Rp. 6,483.75
JUMLAH Rp. 13,383.75
PEMBULATAN : Rp. 13,300.00
A N A L I S A B I A Y A P E K E R J A A N
KODEINDEX U R A I A N HARGA SATUAN JUMLAH HARGA JUMLAH TOTAL
ANALISA
ABK. 850.07 1 BUAH PASANG GRENDEL JENDELA/PINTU
MATERIAL :
1 BH Grendel Jendela/Pintu Rp. 2,400.00 Rp. 2,400.00 Rp. 2,400.00
PEKERJA :
0.020 HOK Pekerja Rp. 30,000.00 Rp. 600.00
0.200 HOK Tukang Rp. 40,000.00 Rp. 8,000.00
0.0010 HOK Mandor Rp. 45,000.00 Rp. 45.00 Rp. 8,645.00
JUMLAH Rp. 11,045.00
PEMBULATAN : Rp. 11,000.00
ABK. 850.16 1 M2 PASANG KACA POLOS TEBAL = 3 MM
MATERIAL :
1.1 M2 Kaca Polos Rp. 30,000.00 Rp. 33,000.00 Rp. 33,000.00
PEKERJA :
0.015 HOK Pekerja Rp. 30,000.00 Rp. 450.00
0.150 HOK Tukang Rp. 40,000.00 Rp. 6,000.00 Rp. 6,450.00
JUMLAH Rp. 39,450.00
PEMBULATAN : Rp. 39,400.00
ABK. 850.17 1 M2 PASANG KACA POLOS TEBAL = 5 MM
MATERIAL :
1.1 M2 Kaca Polos Rp. 40,000.00 Rp. 44,000.00 Rp. 44,000.00
PEKERJA :
0.015 HOK Pekerja Rp. 30,000.00 Rp. 450.00
0.150 HOK Tukang Rp. 40,000.00 Rp. 6,000.00 Rp. 6,450.00
JUMLAH Rp. 50,450.00
PEMBULATAN : Rp. 50,400.00
ABK. 900.13 1 M2 PASANG RAM KAWAT HARMONIKA
MATERIAL :
1.1 M2 Ram Kawat Harmonika Rp. 9,200.00 Rp. 10,120.00
0.02 KG Paku Biasa 1/2" - 1" Rp. 11,500.00 Rp. 230.00
0.0018 M3 Kayu papan Rp. 2,000,000.00 Rp. 3,600.00 Rp. 13,950.00
PEKERJA :
0.001 HOK Pekerja Rp. 30,000.00 Rp. 30.00
0.100 HOK Tukang Rp. 40,000.00 Rp. 4,000.00
0.010 HOK Mandor Rp. 45,000.00 Rp. 450.00 Rp. 4,480.00
JUMLAH Rp. 18,430.00
PEMBULATAN : Rp. 18,400.00
ABK. 900.17 1 BH PASANG RAM KAWAT HARMONIKA
MATERIAL :
1.1 BH Kaca nako 5 mm Rp. 8,625.00 Rp. 9,487.50
0.02 KG Paku Biasa 1/2" - 1" Rp. 11,500.00 Rp. 230.00
0.0250 M3 Besi strip Rp. 5,500.00 Rp. 137.50 Rp. 9,855.00
PEKERJA :
0.010 HOK Pekerja Rp. 30,000.00 Rp. 300.00
0.200 HOK Tukang Rp. 40,000.00 Rp. 8,000.00
0.020 HOK Mandor Rp. 45,000.00 Rp. 900.00 Rp. 9,200.00
JUMLAH Rp. 19,055.00
PEMBULATAN : Rp. 19,000.00
ABK. 900.18 1 M PASANG TALANG SENG BJLS - 30
MATERIAL :
0.5 LBR Seng BJLS - 30 Rp. 17,250.00 Rp. 8,625.00
0.015 KG Paku biasa 2" - 5" Rp. 10,350.00 Rp. 155.25
0.0098 M3 Kayu papan Rp. 2,000,000.00 Rp. 19,600.00
0.25 LTR Plincote Rp. 12,500.00 Rp. 3,125.00 Rp. 31,505.25
PEKERJA :
0.150 HOK Pekerja Rp. 30,000.00 Rp. 4,500.00
0.400 HOK Tukang Rp. 40,000.00 Rp. 16,000.00
0.025 HOK Mandor Rp. 45,000.00 Rp. 1,125.00 Rp. 21,625.00
JUMLAH Rp. 53,130.25
PEMBULATAN : Rp. 53,100.00
A N A L I S A B I A Y A P E K E R J A A N
KODEINDEX U R A I A N HARGA SATUAN JUMLAH HARGA JUMLAH TOTAL
ANALISA
ABK. 950.07 1 M2 PENGECATAN BIDANG KAYU/BESI BERIKUT PLAMIR, SEJENIS CAT KANSAI
MATERIAL :
0.15 KG Plamir Rp. 13,000.00 Rp. 1,950.00
0.2 KG Menie Rp. 21,800.00 Rp. 4,360.00
0.26 KG Cat penutup kayu/besi Rp. 34,500.00 Rp. 8,970.00
0.17 KG Cat dasar Rp. 21,800.00 Rp. 3,706.00 Rp. 18,986.00
PEKERJA :
0.070 HOK Pekerja Rp. 30,000.00 Rp. 2,100.00
0.009 HOK Tukang Rp. 40,000.00 Rp. 360.00
0.0025 HOK Mandor Rp. 45,000.00 Rp. 112.50 Rp. 2,572.50
JUMLAH Rp. 21,558.50
PEMBULATAN : Rp. 21,500.00
ABK. 950.08 1 M2 PENGECATAN BIDANG KAYU LAMA, MUTU CAT KANSAI
MATERIAL :
0.15 KG Plamir Rp. 13,000.00 Rp. 1,950.00
0.17 KG Cat dasar/menie Rp. 21,800.00 Rp. 3,706.00
0.17 KG Cat penutup kayu Rp. 34,500.00 Rp. 5,865.00 Rp. 11,521.00
PEKERJA :
0.070 HOK Pekerja Rp. 30,000.00 Rp. 2,100.00
0.075 HOK Tukang Rp. 40,000.00 Rp. 3,000.00
0.0025 HOK Mandor Rp. 45,000.00 Rp. 112.50 Rp. 5,212.50
JUMLAH Rp. 16,733.50
PEMBULATAN : Rp. 16,700.00
ABK. 950.15 1 M2 PENGECATAN TEMBOK BARU
( 1 LPS PLAMIR + 1 LPS CAT DASAR + 2 LPS CAT PENUTUP ) MUTU CAT VINILEX
MATERIAL :
0.10 KG Plamir tembok Rp. 17,250.00 Rp. 1,725.00
0.26 KG Cat penutup 2 x ( tembok ) Rp. 13,800.00 Rp. 3,588.00
0.10 KG Cat dasar / menie Rp. 21,800.00 Rp. 2,180.00 Rp. 7,493.00
PEKERJA :
0.020 HOK Pekerja Rp. 30,000.00 Rp. 600.00
0.063 HOK Tukang Rp. 40,000.00 Rp. 2,520.00
0.0025 HOK Mandor Rp. 45,000.00 Rp. 112.50 Rp. 3,232.50
JUMLAH Rp. 10,725.50
PEMBULATAN : Rp. 10,700.00
ABK. 950.17 1 M2 PENGECATAN TEMBOK LAMA
( 1 LPS CAT DASAR + 2 LPS CAT PENUTUP ) MUTU CAT VINILEX
MATERIAL :
0.18 KG Cat penutup 2 x ( tembok ) Rp. 13,800.00 Rp. 2,484.00
0.12 KG Cat dasar / menie Rp. 21,800.00 Rp. 2,616.00 Rp. 5,100.00
PEKERJA :
0.028 HOK Pekerja Rp. 30,000.00 Rp. 840.00
0.042 HOK Tukang Rp. 40,000.00 Rp. 1,680.00
0.0025 HOK Mandor Rp. 45,000.00 Rp. 112.50 Rp. 2,632.50
JUMLAH Rp. 7,732.50
PEMBULATAN : Rp. 7,700.00
ABK. 955.26 1 M3 MENGERJAKAN KUSEN PINTU DAN JENDELA
MATERIAL :
1.20 M3 Kayu Rp. 2,000,000.00 Rp. 2,400,000.00 Rp. 2,400,000.00
PEKERJA :
6 HOK Pekerja Rp. 30,000.00 Rp. 180,000.00
20 HOK Tukang Rp. 40,000.00 Rp. 800,000.00
0.3 HOK Mandor Rp. 45,000.00 Rp. 13,500.00 Rp. 993,500.00
JUMLAH Rp. 3,393,500.00
PEMBULATAN : Rp. 3,393,500.00
ABK. 960.36 1 M2 MENGERJAKAN RANGKA DAUN PINTU DAN JENDELA
MATERIAL :
0.035 M3 Kayu Rp. 2,000,000.00 Rp. 70,000.00 Rp. 70,000.00
PEKERJA :
0.8 HOK Pekerja Rp. 30,000.00 Rp. 24,000.00
2 HOK Tukang Rp. 40,000.00 Rp. 80,000.00
0.04 HOK Mandor Rp. 45,000.00 Rp. 1,800.00 Rp. 105,800.00
JUMLAH Rp. 175,800.00
A N A L I S A B I A Y A P E K E R J A A N
KODEINDEX U R A I A N HARGA SATUAN JUMLAH HARGA JUMLAH TOTAL
ANALISA
PEMBULATAN : Rp. 175,800.00
A N A L I S A B I A Y A P E K E R J A A N
KODEINDEX U R A I A N HARGA SATUAN JUMLAH HARGA JUMLAH TOTAL
ANALISA
ABK. 960.36 1 M2 PASANGAN JALUSI
MATERIAL :
0.02 M3 Kayu Rp. 2,000,000.00 Rp. 40,000.00
0.075 KG Paku Biasa 1/2" - 1" Rp. 11,500.00 Rp. 862.50 Rp. 40,862.50
PEKERJA :
0.025 HOK Pekerja Rp. 30,000.00 Rp. 750.00
0.900 HOK Tukang Rp. 40,000.00 Rp. 36,000.00
0.012 HOK Mandor Rp. 45,000.00 Rp. 540.00 Rp. 37,290.00
JUMLAH Rp. 78,152.50
PEMBULATAN : Rp. 78,100.00
ABK. 975.22 1 M3 MENGERJAKAN RANGKA KUDA-KUDA
MATERIAL :
1.1 M3 Kayu Rp. 2,000,000.00 Rp. 2,200,000.00
15 KG Besi strip Rp. 5,500.00 Rp. 82,500.00
0.8 KG Paku biasa 2" - 5" Rp. 10,350.00 Rp. 8,280.00 Rp. 2,290,780.00
PEKERJA :
4 HOK Pekerja Rp. 30,000.00 Rp. 120,000.00
12 HOK Tukang Rp. 40,000.00 Rp. 480,000.00
0.2 HOK Mandor Rp. 45,000.00 Rp. 9,000.00 Rp. 609,000.00
JUMLAH Rp. 2,899,780.00
PEMBULATAN : Rp. 2,899,700.00
ABK. 980.16 1 M2 MENGERJAKAN RANGKA ATAP
MATERIAL :
0.012 M3 Kayu Rp. 2,000,000.00 Rp. 24,000.00
0.15 KG Paku biasa 2" - 5" Rp. 10,350.00 Rp. 1,552.50 Rp. 25,552.50
PEKERJA :
0.1 HOK Pekerja Rp. 30,000.00 Rp. 3,000.00
0.01 HOK Tukang Rp. 40,000.00 Rp. 400.00
0.005 HOK Mandor Rp. 45,000.00 Rp. 225.00 Rp. 3,625.00
JUMLAH Rp. 29,177.50
PEMBULATAN : Rp. 29,100.00
1 BUAH SEPTICTANK
MATERIAL :
2,100 BH Batu bata merah Rp. 290.00 Rp. 609,000.00
1.542 ZAK Semen Portland Rp. 40,000.00 Rp. 61,680.00
1.215 M3 Pasir pasang Rp. 65,000.00 Rp. 78,975.00
0.3 M3 Pasir urug Rp. 50,000.00 Rp. 15,000.00
18.2 KG Besi beton Rp. 7,750.00 Rp. 141,050.00
0.26 KG Bendarat Rp. 9,000.00 Rp. 2,340.00
0.41 KG Paku biasa 2" - 5" Rp. 10,350.00 Rp. 4,243.50
0.031 M3 Papan 2/20 cm Rp. 1,600,000.00 Rp. 49,600.00
4 M' Pipa besi Rp. 20,000.00 Rp. 80,000.00
1 BH Knie Rp. 5,000.00 Rp. 5,000.00
1 BH T. stuk Rp. 5,000.00 Rp. 5,000.00
3 BH T. stuk tanah Rp. 5,000.00 Rp. 15,000.00
0.107 M3 Split 2/3 Rp. 113,000.00 Rp. 12,091.00 Rp. 1,078,979.50
PEKERJA :
4.05 HOK Pekerja Rp. 30,000.00 Rp. 121,500.00
5.40 HOK Tukang Rp. 40,000.00 Rp. 216,000.00
0.54 HOK Mandor Rp. 45,000.00 Rp. 24,300.00 Rp. 361,800.00
JUMLAH Rp. 1,440,779.50
PEMBULATAN : Rp. 1,440,700.00
1 BUAH
MATERIAL :
0.35 M3 Batu kali 15/20 Rp. 82,000.00 Rp. 28,700.00
0.17 M3 Cor beton Rp. 390,400.00 Rp. 66,368.00
1 M' Pipa tanah Rp. 5,000.00 Rp. 5,000.00
20 KG Ijuk Rp. 10,000.00 Rp. 200,000.00 Rp. 300,068.00
PEKERJA :
1.35 HOK Pekerja Rp. 30,000.00 Rp. 40,500.00
1.80 HOK Tukang Rp. 40,000.00 Rp. 72,000.00
0.18 HOK Mandor Rp. 45,000.00 Rp. 8,100.00 Rp. 120,600.00
JUMLAH Rp. 420,668.00
RESAPAN ( 50 X 100 X 150 CM )
A N A L I S A B I A Y A P E K E R J A A N
KODEINDEX U R A I A N HARGA SATUAN JUMLAH HARGA JUMLAH TOTAL
ANALISA
PEMBULATAN : Rp. 420,600.00
ABK.999.01 1 M2 PASANG PAVING BLOCK
MATERIAL :
36 BH Paving Block Rp. 725.00 Rp. 26,100.00
0.10 M3 Pasir Pasang Rp. 65,000.00 Rp. 6,500.00 Rp. 32,600.00
PEKERJA :
0.125 HOK Pekerja Rp. 30,000.00 Rp. 3,750.00
0.250 HOK Tukang Rp. 40,000.00 Rp. 10,000.00
0.013 HOK Mandor Rp. 45,000.00 Rp. 585.00 Rp. 14,335.00
JUMLAH Rp. 46,935.00
PEMBULATAN : Rp. 46,900.00
952.20.b 1 UNIT PASANG GORONG-GORONG BUIS BETON = ø 40 - 5 M
MATERIAL :
5 BH Buis beton ø 40 Rp. 62,000.00 Rp. 310,000.00
15 ZAK Semen Portland Rp. 40,000.00 Rp. 600,000.00
2 M3 Pasir pasang Rp. 65,000.00 Rp. 130,000.00
4.90 M3 Batu belah Rp. 82,000.00 Rp. 401,800.00 Rp. 1,441,800.00
PEKERJA :
22.667 HOK Pekerja Rp. 30,000.00 Rp. 680,010.00
11.333 HOK Tukang Rp. 40,000.00 Rp. 453,320.00 Rp. 1,133,330.00
JUMLAH Rp. 2,575,130.00
PEMBULATAN : Rp. 2,575,100.00
952.20.b 1 UNIT PASANG GORONG-GORONG BUIS BETON = ø 60 - 5 M
MATERIAL :
10 BH Buis beton ø 60 Rp. 72,000.00 Rp. 720,000.00
18 ZAK Semen Portland Rp. 40,000.00 Rp. 720,000.00
2.3 M3 Pasir pasang Rp. 65,000.00 Rp. 149,500.00
5.6 M3 Batu belah Rp. 82,000.00 Rp. 459,200.00 Rp. 2,048,700.00
PEKERJA :
28 HOK Pekerja Rp. 30,000.00 Rp. 840,000.00
14 HOK Tukang Rp. 40,000.00 Rp. 560,000.00 Rp. 1,400,000.00
JUMLAH Rp. 3,448,700.00
PEMBULATAN : Rp. 3,448,700.00
1 UNIT PASANG GORONG-GORONG PLAT BETON = 1 x 1 x 5 M
MATERIAL :
9.67 M3 Batu belah 15/20 Rp. 82,000.00 Rp. 792,940.00
7.30 M3 Pasir pasang Rp. 65,000.00 Rp. 474,500.00
5.00 M2 Bahan bekisting Rp. 68,105.00 Rp. 340,525.00
1.20 M3 Split 2/3 Rp. 113,000.00 Rp. 135,600.00
32.60 ZAK Semen Portland Rp. 40,000.00 Rp. 1,304,000.00
2.76 KG Kawat beton/bendrat Rp. 9,000.00 Rp. 24,840.00
183.68 KG Besi beton Rp. 7,750.00 Rp. 1,423,520.00 Rp. 4,495,925.00
PEKERJA :
10.00 M3 Galian tanah Rp. 13,800.00 Rp. 138,000.00
9.67 M3 Pasangan Batu Rp. 306,700.00 Rp. 2,965,789.00
0.94 M3 Cor beton Rp. 63,100.00 Rp. 59,314.00
6.00 M2 Bekisting Rp. 19,625.00 Rp. 117,750.00
186.44 KG Pembesian Rp. 503.50 Rp. 93,872.54 Rp. 3,374,725.54
JUMLAH Rp. 7,870,650.54
PEMBULATAN : Rp. 7,870,600.00
1 M' PEMASANGAN BUIS BETON ( GRAVEL ) = 1/2 DIA. 30
MATERIAL :
1 BUAH Buis beton 1/2 dia. 30 cm Rp. 26,000.00 Rp. 26,000.00
0.090 ZAK Semen Portland Rp. 40,000.00 Rp. 3,600.00
0.013 M3 Pasir pasang Rp. 65,000.00 Rp. 845.00
22 BUAH Batu bata merah Rp. 290.00 Rp. 6,380.00 Rp. 36,825.00
PEKERJA :
0.060 HOK Pekerja Rp. 30,000.00 Rp. 1,800.00
0.028 HOK Tukang Rp. 40,000.00 Rp. 1,120.00 Rp. 2,920.00
JUMLAH Rp. 39,745.00
PEMBULATAN : Rp. 39,700.00
A N A L I S A B I A Y A P E K E R J A A N
KODEINDEX U R A I A N HARGA SATUAN JUMLAH HARGA JUMLAH TOTAL
ANALISA
AN. DPUTL 1 BLN BIAYA MENGGILAS
MATERIAL :
1,000 LTR Solar Rp. 4,300.00 Rp. 4,300,000.00
20 LTR Minyak pelumas Rp. 23,000.00 Rp. 460,000.00
5 KG Stempet Rp. 15,000.00 Rp. 75,000.00 Rp. 4,835,000.00
PEKERJA :
30 Masinis Rp. 45,000.00 Rp. 1,350,000.00
30 Pembantu Masinis Rp. 35,000.00 Rp. 1,050,000.00
30 Penjaga Rp. 30,000.00 Rp. 900,000.00
150 Pekerja Rp. 30,000.00 Rp. 4,500,000.00 Rp. 7,800,000.00
JUMLAH Rp. 12,635,000.00
BIAYA MENGGILAS 1 HARI : Rp. 505,400.00
PEMBULATAN : Rp. 505,400.00
BIAYA MENGGILAS 1 JAM : Rp. 101,080.00
PEMBULATAN : Rp. 101,000.00
K. 516 1 M2 KONTRUKSI LAPIS PONDASI BAWAH (LPB) - TELFORD
MENGGUNAKAN BURUH
MATERIAL :
0.625 M3 Batu belah 15/20 Rp. 82,000.00 Rp. 51,250.00
0.250 M3 Batu pecah 5/7 Rp. 65,000.00 Rp. 16,250.00
0.375 M3 Pasir urug Rp. 50,000.00 Rp. 18,750.00
0.050 Set Alat bantu Rp. 50,000.00 Rp. 2,500.00 Rp. 88,750.00
PERALATAN :
0.063 JAM Mesin Gilas 8 - 10 Ton Rp. 84,233.33 Rp. 5,264.58 Rp. 5,264.58
PEKERJA :
1.238 Pekerja Rp. 30,000.00 Rp. 37,125.00
0.038 Tukang Rp. 40,000.00 Rp. 1,500.00
0.013 Mandor Rp. 45,000.00 Rp. 562.50 Rp. 39,187.50
JUMLAH Rp. 133,202.08
PEMBULATAN : Rp. 133,200.00
AN. W. 3 1 M2 PASANGAN SLINSTLAAG TEBAL = 6 CM
MATERIAL :
0.091 M3 Batu belah 15/20 Rp. 82,000.00 Rp. 7,462.00
0.020 M3 Batu pecah 5/7 Rp. 65,000.00 Rp. 1,300.00 Rp. 8,762.00
PEKERJA :
0.075 Pekerja Rp. 30,000.00 Rp. 2,250.00
0.004 Tukang Rp. 40,000.00 Rp. 150.00 Rp. 2,400.00
BIAYA PENGGILASAN :
0.063 JAM Mesin Gilas 8 - 10 Ton Rp. 84,233.33 Rp. 5,264.58 Rp. 5,264.58
JUMLAH Rp. 16,426.58
PEMBULATAN : Rp. 16,400.00
KONTROL : CAMP REAL PAS. BATU OLEH KSM
RENCANA P L T
VOLUME 47.46 226 0.3 0.7
BLM 11,650,000
SWD 4,640,000
TOTAL 16,290,000
1 M3 343,236
REAL
VOLUME 84.00 400 0.3 0.7
BLM 11,650,000
SWD 4,640,000
TOTAL 16,290,000
1 M3 193,929
PASANGAN BATU ( 1 m3 ) 1 Zak HARGA MATERIAL
CAMP BATU PC PASIR 50 BATU PC PASIR
1 : 2 1.1 5.332 0.426 323,470 75,000 40,000 65,000
1 : 3 1.1 4.040 0.485 275,625
1 : 4 1.1 3.260 0.520 246,700
1 : 5 1.1 2.723 0.545 226,861
1 : 6 1.1 2.340 0.561 212,565
1 : 7 1.1 2.051 0.574 201,850
1 : 8 1.1 1.826 0.584 193,508
BETON TAK BERTULANG ( 1 M3 ) 1 Zak
CAMP PC PASIR SPLIT 50
1 : 2 : 3 6.800 0.600 0.900
1 : 3 : 6 4.300 0.500 1.000
1 : 3 : 5 4.574 0.550 0.910
1 : 2 : 4 4.167 0.477 0.922
1 : 2 : 5 5.108 0.425 1.062
1 : 2,5 : 2,5 6.671 0.667 0.667
1 : 3 : 6 4.052 0.508 1.016
1 : 4 : 8 3.281 0.525 1.050
1 : 3 : 4 5.400 0.650 0.860
1 : 1,5 : 2,5 8.300 0.840 0.800
BESI BETON (Round Bar @12 m)
ø mm Berat
6 2.66
8 4.74
10 7.40
12 10.70
16 18.72
19 27.00
22 36.48
PASANGAN BATA MERAH ( m3 ) 1 Zak
CAMP Bata PC Pasir 50
1 : 2 500 4.165 0.320
1 : 3 500 3.273 0.420
1 : 4 500 2.618 0.420
1 : 5 500 2.083 0.385
1 : 6 500 1.550 0.385
1 : 7 500 1.428 0.385
1 : 8 500 1.250 0.385
PLESTERAN ( m2 ) Tebal = 1 cm 1 Zak PLESTERAN ( m2 ) Tebal = 1,5 cm 1 Zak
CAMP PC Pasir 50 CAMP PC Pasir 50
1 : 2 0.119 0.010 1 : 2 0.178 0.014
1 : 3 0.090 0.011 1 : 3 0.135 0.016
1 : 4 0.072 0.012 1 : 4 0.108 0.017
1 : 5 0.061 0.012 1 : 5 0.091 0.018
1 : 6 0.052 0.013 1 : 6 0.078 0.019
1 : 7 0.046 0.013 1 : 7 0.068 0.016
A N A L I S A B I A Y A P E K E R J A A N
KODEINDEX U R A I A N HARGA SATUAN JUMLAH HARGA JUMLAH TOTAL KETERANGAN
ANALISA
K. 516 1 M2 KONSTRUKSI LAPIS PONDASI BAWAH ( LPB ) - TELPORD URAIAN : VOLUME = 80 M2 PEKERJA : 1. Material disiapkan dilokasi pekerjaan 0.038 HOK Mandor Rp. 45,000 Rp. 1,687.50 2. Menghampar pasir setebal 5 cm. 1.238 HOK Pekerja Rp. 30,000 Rp. 37,125.00 Rp. 38,812.50 3. Batu pecah berukuran 10/15 cm MATERIAL : disusun berdiri. 0.625 M3 Batu belah 15/20 Rp. 82,000 Rp. 51,250.00 4. Batu pecah yang lebih kecil mengisi 0.250 M3 Batu pecah 5/7 Rp. 65,000 Rp. 16,250.00 rongga diatasnya, sehingga rata 0.375 M3 Pasir urug Rp. 50,000 Rp. 18,750.00 Rp. 86,250.00 kemudian dipadatkan/digilas dengan PERALATAN : mesin gilas. 0.050 SET Alat Bantu Rp. 50,000 Rp. 2,500.00 ANGGAPAN / ASUMSI : 0.063 JAM Mesin Gilas 3 Roda 8-10 Ton Rp. 84,233.33 Rp. 5,264.58 Rp. 7,764.58 1. Material dikirim ketempat pekerjaan
JUMLAH Rp. 132,827.08 oleh leveransir. PEMBULATAN : Rp. 132,800.00 2. Batu sudah dipecah
3. Tanah dasar sudah dipersiapkan4. Dipadatkan sampai tebal 20 cm5. Menggunakan tenaga manusia = 400 m2 / hari.
K. 615 1 M2 LABURAN ASPAL - SATU LAPIS (BURTU) ATAU (BURDA 1 ) URAIAN : VOLUME = 1800 M2 PEKERJA : 1. Bersihkan permukaan aspal dari 0.002 HOK Mandor Rp. 45,000 Rp. 75.00 material lepas. 0.003 HOK Tukang Rp. 40,000 Rp. 133.33 2. Semprotkan prime aspal cair. 0.017 HOK Pekerja Rp. 30,000 Rp. 500.00 Rp. 708.33 3. Lapisi permukaan aspal dengan MATERIAL : Rp. bitumen dan taburkan split serta 2.081 KG Aspal Rp. 6,700 Rp. 13,939.72 digilas. 0.322 LITER Minyak bakar Rp. 3,100 Rp. 998.89 0.010 M3 Kayu Bakar Rp. 90,000 Rp. 900.00 ANGGAPAN / ASUMSI : 0.020 M3 Kerikil pecah tersaring Rp. 113,000 Rp. 2,260.00 Rp. 18,098.61 1. Hasil kerja 600 m2/hari. PERALATAN : 2. Agregat halus hasil saringan 20 mm 0.001 SET Alat Bantu Rp. 50,000 Rp. 41.67 dari mesin pemecah batu ditimbun 0.008 JAM Mesin Gilas 3 Roda 8-10 Ton Rp. 84,233.33 Rp. 701.94 Rp. 743.61 ditempat pekerjaan oleh leveransir.
JUMLAH Rp. 19,550.56 3. Permukaan yang dilabur telah selesai PEMBULATAN : Rp. 19,500.00 digilas dan terikat dengan binder.
4. Laburan permukaan menggunakan aspal = 1 liter/m2.5. Menggunakan minyak residu = 1,6 liter/m2.6. Agregat halus 1:2 cm disebar = 50 m2/m3
K. 618 1 M2 LAPIS PENETRASI MAKADAM = 5 CM ( LAPEN ) URAIAN : VOLUME = 1400 M2 PEKERJA : 1. Semprotkan aspal tack coat 0.004 HOK Mandor Rp. 45,000.00 Rp. 192.86 = 0,8 liter/m3 0.004 HOK Tukang Rp. 40,000.00 Rp. 171.43 2. Hamparkan batu 3/5 = 25 m2/m3 0.141 HOK Pekerja Rp. 30,000.00 Rp. 4,242.86 dan dipadatkan. MATERIAL : Rp. 4,607.14 3. Hamparkan batu 2/3 = 45 m2/m3 0.040 M3 Batu pecah 3 - 5 cm Rp. 115,000 Rp. 4,600.00 dan dipadatkan. 0.022 M3 Batu pecah 2 - 3 cm Rp. 126,000 Rp. 2,790.00 4. Semprotkan aspal = 2,5 kg/m2. 0.011 M3 Batu pecah 1 - 2 cm Rp. 130,000 Rp. 1,439.29 5. Hamparkan agregat pengunci split 1/2 0.004 M3 Pasir beton Rp. 113,000 Rp. 443.93 = 90 m2/m3 dan dipadatkan. 4.479 KG Aspal Rp. 6,700 Rp. 30,006.43 6. Semprotkan aspal 1,5 kg/m2 0.010 M3 Kayu Bakar Rp. 90,000 Rp. 900.00 7. Taburkan pasir rata-rata = 400 m2/m3. 0.321 LITER Minyak bakar Rp. 3,100 Rp. 996.43 Rp. 41,176.07 dan digilas. PERALATAN : 0.006 SET Alat Bantu Rp. 50,000 Rp. 289.29 ANGGAPAN / ASUMSI : 0.011 JAM Mesin Gilas 3 Roda 8-10 Ton Rp. 101,000.00 Rp. 1,082.14 Rp. 1,371.43 1. Menggunakan tenaga manusia.
JUMLAH Rp. 47,154.64 2. Harga material ( agregat pokok, agre- PEMBULATAN : Rp. 47,100.00 gat pengunci, agregat penutup, aspal )
adalah harga dilokasi proyek.3. Volume aspal cair untuk tack coat dan prime coat = 0,8 liter/m2
5. Agregat dikirim sampai tempat pekerjaan oleh leveransir.
4. Tebal lapisan penetrasi ± 5 cm
A N A L I S A B I A Y A P E K E R J A A N
KODEINDEX U R A I A N HARGA SATUAN JUMLAH HARGA JUMLAH TOTAL KETERANGAN
ANALISA
K. 637 1 M3 PELAPISAN ULANG ATAU PENETRASI MACADAM = 7 CM ( LPA ) URAIAN : VOLUME = 70 M3 PEKERJA : 1. Hampar split 3/5 rata-rata = 16 m2/m3 0.086 HOK Mandor Rp. 45,000 Rp. 3,857.14 2. Hampar agregat 2/3 cm = 60 m2/m3 0.086 HOK Tukang Rp. 40,000 Rp. 3,428.57 3. Padatkan masing-masing lap. Batu 2.829 HOK Pekerja Rp. 30,000 Rp. 84,857.14 Rp. 92,142.86 4. Semprotkan aspal = 3,7 liter/m3 MATERIAL : 5. Tabur agregat 1-2 cm = 70 m2/m3 0.886 M3 Batu pecah 3 - 5 cm Rp. 115,000 Rp. 101,857.14 6. Semprotkan aspal = 1,5 liter/m2 0.237 M3 Batu pecah 2 - 3 cm Rp. 126,000 Rp. 29,880.00 7. Taburkan pasir (binder) = 90 m2/m3 0.203 M3 Batu pecah 1 - 2 cm Rp. 130,000 Rp. 26,371.43 ANGGAPAN / ASUMSI : 0.159 M3 Pasir beton Rp. 113,000 Rp. 17,918.57 1. Menggunakan tenaga manusia. 78.571 KG Aspal Rp. 6,700 Rp. 526,428.57 2. Batu pecah dikirim sampai tempat 0.020 M3 Kayu Bakar Rp. 90,000 Rp. 1,800.00 pekerjaan oleh leveransir. 6.429 LITER Minyak bakar Rp. 3,100 Rp. 19,928.57 Rp. 724,184.29 3. Tebal perkerasan = 7 cm PERALATAN : 4. Hasil kerja = 2000 m2/minggu ( 6 hr ) 0.116 SET Alat Bantu Rp. 50,000 Rp. 5,785.71 0.214 JAM Mesin Gilas 3 Roda 8-10 Ton Rp. 101,000.00 Rp. 21,642.86 Rp. 27,428.57
JUMLAH Rp. 843,755.71 PEMBULATAN : Rp. 843,700.00
HARGA PER - M2 : Rp. 59,045.19 PEMBULATAN : Rp. 59,000.00
K. 720 1 M3 URAIAN : VOLUME = 6 M3 PEKERJA : 1. Material dikirim oleh leveransir 0.167 HOK Mandor Rp. 45,000 Rp. 7,500.00 2. Pencampuran beton ditempat 0.167 HOK Tukang Rp. 40,000 Rp. 6,666.67 pekerjaan. 2.000 HOK Pekerja Rp. 30,000 Rp. 60,000.00 Rp. 74,166.67 ANGGAPAN / ASUMSI : MATERIAL : 1. Bahan-bahan dikirim ketempat peker- 0.500 M3 Pasir pasang Rp. 65,000 Rp. 32,500.00 jaan oleh leveransir. 6.250 ZAK Semen Rp. 40,000 Rp. 250,000.00 2. Dipakai agregat pecah dan tersaring. 0.033 M3 Kayu bekisting Rp. 1,600,000 Rp. 53,333.33 3. Hasil kerja = 60 m3/hari-6jam 0.833 M3 Kerikil pecah 2/3 Rp. 113,000 Rp. 94,166.67 Rp. 430,000.00 ( 9 campuran per jam ). PERALATAN : 0.100 SET Alat bantu Rp. 50,000 Rp. 5,000.00 5. Dalam 1 m3 beton dibutuhkan 0.833 JAM Concrete mixer 125 L/6 HP Rp. 40,000 Rp. 33,333.33 Semen = 6,25 Zak. 0.833 JAM Pompa air (ø 5 cm) 30 m3/jam Rp. 15,000 Rp. 12,500.00 Rp. 50,833.33 6. Setiap campuran memerlukan
JUMLAH Rp. 555,000.00 = 30 Kg semen. PEMBULATAN : Rp. 555,000.00
PASANGAN RABAT BETON 1 M2 = Rp. 37,198.39 PEMBULATAN : Rp. 37,100.00
UNTUK MENJAGA KEAUSAN LAPISAN ATAS RABAT BETON DARI GESEKAN RODA DLLMAKA DIHARAPKAN UNTUK MENAMBAH LAPISAN PLESTERAN.
ABK.360.04 1 M2 PLESTERAN A.D. 1 : 4 TEBAL = 15 MM MATERIAL : 0.104 KG Semen Portland Rp. 40,000.00 Rp. 4,160.00 0.020 M3 Pasir Pasang Rp. 65,000.00 Rp. 1,300.00 Rp. 5,460.00
PEKERJA : 0.200 HOK Pekerja Rp. 30,000.00 Rp. 6,000.00 0.150 HOK Tukang Rp. 40,000.00 Rp. 6,000.00 0.010 HOK Mandor Rp. 45,000.00 Rp. 450.00 Rp. 12,450.00
JUMLAH Rp. 17,910.00 PEMBULATAN : Rp. 17,900.00
K. 615 1 M2 LABURAN ASPAL - SATU LAPIS (BURTU) ATAU (BURDA 1 ) URAIAN : VOLUME = 1800 M2 PEKERJA : 1. Bersihkan permukaan aspal dari 0.002 HOK Mandor Rp. 45,000 Rp. 75.00 material lepas. 0.003 HOK Tukang Rp. 40,000 Rp. 133.33 2. Semprotkan prime aspal cair. 0.017 HOK Pekerja Rp. 30,000 Rp. 500.00 Rp. 708.33 3. Lapisi permukaan aspal dengan MATERIAL : bitumen dan taburkan split serta 2.081 KG Aspal Rp. 6,700 Rp. 13,939.72 digilas. 0.322 LITER Minyak bakar Rp. 3,100 Rp. 998.89 0.010 M3 Kayu Bakar Rp. 90,000 Rp. 900.00 ANGGAPAN / ASUMSI : 0.020 M3 Kerikil pecah 2/3 Rp. 113,000 Rp. 2,260.00 Rp. 18,098.61 1. Hasil kerja 600 m2/hari. PERALATAN : 2. Agregat halus hasil saringan 20 mm 0.001 SET Alat Bantu Rp. 50,000 Rp. 41.67 dari mesin pemecah batu ditimbun 0.008 JAM Mesin Gilas Rp. 84,233.33 Rp. 701.94 Rp. 743.61 ditempat pekerjaan oleh leveransir.
JUMLAH Rp. 19,550.56 3. Permukaan yang dilabur telah selesai PEMBULATAN : Rp. 19,500.00 digilas dan terikat dengan binder.
4. Laburan permukaan menggunakan aspal = 1 liter/m2.5. Menggunakan minyak residu = 1,6 liter/m2.6. Agregat halus 1:2 cm disebar
BETON NON STRUKTUR / RABAT BETON ( KELAS K. 125 )
4. Campuran 1 Pc : 3 Ps : 5 Kr
A N A L I S A B I A Y A P E K E R J A A N
KODEINDEX U R A I A N HARGA SATUAN JUMLAH HARGA JUMLAH TOTAL KETERANGAN
ANALISA = 50 m2/m3
TENGAH 148,000 CILEDUG 135,500 160,000 CILEDUG 147,500 180,000 CILEDUG 167,500
975,000 DRUM
850,000 MOBDMOP STOM VIBRO 375,000 HR
800,000 4-6 TON 325,000
RENCANA ANGARAN BIAYA PEKERJAAN :LOKASI : APANITIA KEMITRAAN :TAHUN ANGGARAN : 2007
NO. URAIAN PEKERJAAN
RENCANA ANGGARAN BIAYA SUMBER PEMBIAYAAN
SATUAN VOLUME BOBOT PAKET SWADAYA PAKEM
APBD SWADAYA
I. PEKERJAAN PERSIAPAN1. Pekerjaan Pengukuran M2 1.00 100,000.00 100,000.00 0.14 50,000.00 50,000.00 2. Pekerjaan Bouwplank M2 10.00 37,800.00 378,000.00 0.52 189,000.00 189,000.00 3. Papan Nama Proyek LS 1.00 231,800.00 231,800.00 0.32 115,900.00 115,900.00 4. Dokmentasi dan Pelaporan LS 1.00 500,000.00 500,000.00 0.69 250,000.00 250,000.00 5. Kegiatan Pertemuan dan FGD LS 1.00 800,000.00 800,000.00 1.11 400,000.00 400,000.00
Jumlah I 2,009,800.00 2.78 1,004,900.00 1,004,900.00 -
II PEKERJAAN KONSTRUKSI TPT SALURAN1. Bongkaran pasangan lama M3 54.00 89,500.00 4,833,000.00 6.69 2,416,500.00 2,416,500.00 2. Pasangan batu AD. 1 : 4 P = 300 L = 0.25 T = 0.6 M3 45.00 326,700.00 14,701,500.00 20.36 7,350,750.00 7,350,750.00 3. Plesteran AD. 1 : 4 M2 111.00 17,900.00 1,986,900.00 2.75 993,450.00 993,450.00 4. - - - - 5. - - - - 6. - - - - 7. - - - -
Jumlah II 21,521,400.00 29.81 10,760,700.00 10,760,700.00 -
III PEKERJAAN JALAN LAPEN - Pembersihan dan perataan M2 900.00 5,200.00 4,680,000.00 6.48 2,340,000.00 2,340,000.00 Lapen P = 300 L = 3.00 T = 0.05 M2 900.00 47,100.00 42,390,000.00 58.71 21,195,000.00 21,195,000.00 Mob Demob Stoome LS 1.00 1,600,000.00 1,600,000.00 2.22 800,000.00 800,000.00
- - - - - - - - -
Jumlah III 48,670,000.00 67.41 24,335,000.00 24,335,000.00 -
JUMLAH TOTAL 72,201,200.00 100.00 36,100,600.00 36,100,600.00 -
1 Swadaya masyarakat dan BKM Rp. -
2 Nilai Dana PAKET yang ditagihkan Rp. 72,201,200.00 -
Terbilang :
HARGA SATUAN (Rp)
JUMLAH HARGA(Rp)