Construction Content
Planning Stage
Cost (in
million USD)
WWTP29,00CMD
(1st stage)87,00CMD
(full stage)
37.1
WRP(included pipelines)
8,000CMD(1st stage)
15,500CMD
(2nd stage)
50.9
Total 88.0Operating Cost(in million USD)
WWTP 34.5
WRP 33.3
Total 67.8
Delivery PipelineAnping WWTP Outline
Tainan Anping New Water Plant Design-Build-Operate (DBO) Project
• Anping WWTP in operation• 132,000 CMD Wastewater
Treatment Design Scale• 10.31 hectares, Land Area
• Design Scale: 37,500 CMD• Land Area: around 0.17 hectares• Construction include: Anping WRP construction Delivery pipeline and
distribution tank• Operational work include: 15 years of operation for
WWTP and WRP
Anping WRP Outline
Anping New Water Industrial Briefing Anping WRP Planning Anping WWTP and WRP Location
WRP Reclaimed Water Quality
NEC
Hilton Birmingham Metropole
Birmingham Airport
台南市安平區再生水廠新建工程統包計畫
Tainan Anping New Water Plant Design-Build-Operate (DBO) Project
Salisbury room
(Ground floor)
Please join us for the Anping New Water Industrial Briefing
Purpose: Introduce Anping New Water to potential tenders.
Date: 23rd May 2018 Registration: 12:30~13:00 pm Location: Hilton Birmingham Metropole
Salisbury Room. (10 mins walk from NEC) Address: Pendigo Way, Marston Green,
Birmingham B40 1PP UK
Tainan Anping New Water Plant Design-Build-Operate (DBO) Project
投影片編號 1投影片編號 2投影片編號 3