GOVERNMENT OF ODISHA DEPARTMENT OF WATER RESOURCES. ANNUAL REPORT OF BOUDH IRRIGATION DIVISION, BOUDH. FOR THE YEAR 2019-20 EXECUTIVE ENGINEER, BOUDH IRRIGATION DIVISION, BOUDH.

ANNUUALL RREEPPOORRTT ANN - dowrodisha.gov.in

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: ANNUUALL RREEPPOORRTT ANN - dowrodisha.gov.in

GGOOVVEERRNNMMEENNTT OOFF OODDIISSHHAA

DDEEPPAARRTTMMEENNTT OOFF WWAATTEERR RREESSOOUURRCCEESS..

AANNNNUUAALL RREEPPOORRTT

OOFF

BBOOUUDDHH IIRRRRIIGGAATTIIOONN DDIIVVIISSIIOONN,,

BBOOUUDDHH..

FFOORR TTHHEE YYEEAARR 22001199--2200

EXECUTIVE ENGINEER, BOUDH IRRIGATION DIVISION, BOUDH.

Page 2: ANNUUALL RREEPPOORRTT ANN - dowrodisha.gov.in

ANNUAL REPORT FOR THE YEAR 2019-20 OF BOUDH IRRIGATION DIVISION, BOUDH.

1. INTRODUCTION:

Boudh Irrigation Division, Boudh created in year 1963. It is one of the such division

which plays an important role in irrigation and flood fighting work of river Mahanadi, Tel,

Salki in Boudh District and part of the Phulbani District. It is under the Administrative control

of Superintending Engineer, Bolangir irrigation circle, Bolangair and Chief Engineer and Basin

manager, Tel Basin, Bhawanipatana. It ensures irrigation to a vast patch through its three

(3) Nos of project such as Pillasalki Irrigation Project in Phulbani, Bagh Barrage Project,

Sagada and Salki Irrigation Project in Boudh district. It Provides 33824 Ha. of irrigation in

khariff and 2240 Ha. of irrigation in Rabi season in draught prone area of Boudh / Phulbani

Dist. All the flood fighting works are being executed and supervised under the Chief Engineer

and Basin Manager, lower Mahanadi Basin, Bhubaneswar.

2. STAFF POSITION:

SL NO NAME OF THE INCUMBENCY

1 Sri Dhananjaoy Pusti,Executive Engineer

2 Sri Lokanatha Barik,Deputy Executive Engineer

3 Sri Niranjan Rana,Deputy Executive Engineer

4 Sri Keshar Murmu, Asst.Executive Engineer, (Estr.)

5 Sri Chudamani Gurliha,A.E.

6 Sri Ramesh Ch.Behera,A.E.

7 Sri Hrushikesh Das,A.E.

8 Sri Bijla Ekka,A.E.

9 Sri Basanta Kr.Mohakuda,J.E.

10 Sri Subrata Kr.Mallick,J.E.

Page 3: ANNUUALL RREEPPOORRTT ANN - dowrodisha.gov.in

11 Anadi Behera,J.E.

12 Sri Bijaya Kr.Das,J.E.

13 Sri Hemanta Kr.Majhi,J.E.(Contractual)

14 Sri Tusharkanta Patra,J.E.(Contractual)

15 Sri Satya Sundar Patra,J.E.

16 Sri Simanchal Sethi,Senior Clerk

17 Sri Babulal Dehuri,Junior Clerk

18 Sri Manas Kr.Singh,Junior Clerk

19 Sri Dinababdhu Panigrahi,Junior clerk

20 Sri Balaram Mukhi,Draughts Man

21 Sri Prasan Kr.Dash,Daftary

22 Sri Banara Pradhan,Peon

23 Sri Subash Ch.Panigrahi,Peon

24 Sri Ranjit Bagrati,Peon

25 Sri Alok Kr.Pattanaik,Peon

26 Sri Bhaskar Behera,Peon

27 Sri Satrughan Bhoi

28 Sri Uchhaba Bagh,Peon

29 Sri Bijaya Kr.Jena,Peon

30 Smt.Santilata Hota,Peon

31 Smt.Subasini Mohapatra,Peon

3. IRRIGATION TO TAIL END OF THE AYACUT:

The main moto of the Division and field functionary is to provide irrigation to the Tail end of the ayacut in khariff season, project wise ayacut and distribution system is given below.

NAME OF PROJECT LENGTH OF

DISTRIBUTION SYSTEM

AYACUT AREA

Pillasalki Irrigation Project, Phulbani

53.80 Km 2033 Ha.

Bagh Barrage Project, Sagada

132.012Km 10874 Ha.

Salki Irrigation Project, Paljhar

250.32Km 20917 Ha.

Page 4: ANNUUALL RREEPPOORRTT ANN - dowrodisha.gov.in

4. FLOOD PROTECTION WORK:

This division has taken up different types of flood protection works under the assistance of the

state Govt. and NABARD in Plan and Non-plan allotment. The component of these works are mostly

lunching with stones in scourced bank followed with rough stone dry packing to protect the natural

bank from further erosion, we are working in a mission mood so that the local people feel secure

during flood time because the flood water will not enter into the village area. The work taken up under

cirtical grant (Major/Medium) for the three (3) nos of projects along with the River Embankment

works for the financial Year 2019-20 is given below.

Sl No Nos of Work Name of the

Scheme

Agt. Amount Upto date Exp. Remarks

1 7Nos RE (State Plan) 185.74 142.75 4 work Completed 3 works Spill over to Next

year 2 8Nos Restoration 258.37 209.83 7 work Completed 1

work Spill over to Next year

3 3Nos RE Critical 44.81 44.81 Completed

4 2 nos NABARD WORK 255 176.82 1 work Spill over to Next year

5 19 Nos Medium Critical 134.55 127.51 18 Nos of works are Completed 1 work Spill over to Next year

6 30Nos Major Critical 236.46 173.42 27 Nos of works are Completed 3 works Spill over to Next year

7 3 nos. RCER WORK 477.48 79.33 Spill over to Next year

Page 5: ANNUUALL RREEPPOORRTT ANN - dowrodisha.gov.in

Right Bank of river Mahanadi near village Khandi

Right bank of Laxmi nalla near village Puruna Katak

Page 6: ANNUUALL RREEPPOORRTT ANN - dowrodisha.gov.in

Right Main Canal Bagh barrage Project, Sagada Sarasara Disty Boudh

Flood protection work at Jharasahi

Page 7: ANNUUALL RREEPPOORRTT ANN - dowrodisha.gov.in

C. C lining to Ghugurumunda sub-minor fromRD 950m to RD 1250m with repair to its structure of LMC under

C.C lining to Left main canal from RD 22250m to RD 22422m with repair to its structure under BBP

.

Page 8: ANNUUALL RREEPPOORRTT ANN - dowrodisha.gov.in

5. PARTICIPATORY IRRIGATION:

Revised Beneficiary list of Panipanchayat is submitted to the Superintending Engineer, Balangir

Irrigation Circle, Balangir for conducting Panipanchayat election.

Details of Panipanchayats about election are given below.

Sl. No

Name of the Project

Name of the PP Ayacut Area in

Ha.

Fund required in Rs. @ Rs. 40/- per Ha.

Date of last

Election held

Due date of the

Election

1 2 3 4 5 6 7

1

Salki

Major

Irrigation

Project

Baba Goudabudha PP 679.29 27171.60 30.06.2008 29.06.2014

2 Baba Bhagabata Goswami PP 626.17 25046.80 30.06.2008 29.06.2014

3 Baba Trinath PP 482.11 19284.40 30.06.2008 29.06.2014

4 Maa Khambeswari Mahila PP 660.59 26423.60 30.06.2008 29.06.2014

5 Baba Dhabaleswar PP 750.19 30007.60 03.07.2008 02.07.2014

6 Baba Swapneswar PP 737.81 29512.40 03.07.2008 02.07.2014

7 Maa Brahmanidevi Bhairabi PP 680.27 27210.80 03.07.2008 02.07.2014

8 Baba Baidyanath PP 474.73 18989.20 03.07.2008 02.07.2014

9 Maata Maheswari PP 587.97 23518.80 06.07.2008 05.07.2014

10 Chhatrapati Sibaji PP 490.83 19633.20 06.07.2008 05.07.2014

11 Maa Sibani PP 585.84 23433.60 06.07.2008 05.07.2014

12 Badamahaprabhu Adibasi Mahila PP 390.47 15618.80 06.07.2008 05.07.2014

13 Brundaban PP 639.27 25570.80 11.07.2008 10.07.2014

14 Mathura PP 532.78 21311.20 11.07.2008 10.07.2014

15 Baba Subarneswar PP 522.02 20880.80 11.07.2008 10.07.2014

16 Maa Baraladevi PP 384.26 15370.40 11.07.2008 10.07.2014

17 Annapurna Pitabali PP 575.29 23011.60 14.07.2008 13.07.2014

18 Rushyasrunga PP 371.50 14860.00 14.07.2008 13.07.2014

19 Buddha Dev PP 384.61 15384.40 14.07.2008 13.07.2014

20 Jagannath PP 601.77 24070.80 10.05.2008 09.05.2014

21 Sri Sri Satya Sai PP 401.52 16060.80 10.05.2008 09.05.2014

22 Sri Sri Jaya Hanuman PP 562.07 22482.80 25.05.2008 24.05.2014

23 Maa Maheswari PP 602.73 24109.20 10.05.2008 09.05.2014

24 Maruti PP 544.82 21792.80 10.06.2008 09.05.2014

25 Baba Patitapabana PP 642.75 25710.00 25.05.2008 24.05.2014

26 Maa Pitabali PP 579.21 23168.40 25.05.2008 24.05.2014

27 Maa Narayani PP 556.13 22245.20 25.05.2008 24.05.2014

28 Baba Raghunatha PP 697.40 27896.00 10.06.2008 09.06.2014

29 Dadhibamana PP 538.89 21555.60 14.06.2008 13.06.2014

30 Bauti Devi PP 487.43 19497.20 14.06.2008 13.06.2014

31 Gokuleswar PP 407.95 16318.00 14.06.2008 13.06.2014

32 Shaktimayee PP 664.23 26569.20 14.06.2008 13.06.2013

33 Baba Maneswar PP 506.44 20257.60 14.06.2008 13.06.2014

34 Sri Ram PP 481.84 19273.60 14.06.2008 13.06.2014

35 Maa Chandi PP 420.76 16830.40 29.06.2008 28.06.2014

36 Harekrushna Mahatab Yobak PP 639.06 25562.40 06.07.2008 05.07.2014

19891 795640.00

Page 9: ANNUUALL RREEPPOORRTT ANN - dowrodisha.gov.in

Sl. No

Name of the

Project

Name of the PP Ayacut

Area in Ha.

Fund required in

Rs. @ Rs. 40/- per

Ha.

Date of last Election

held

Due date of the

Election

1 2 3 4 5 6 7

1 Pillasalki Medium Irrigation Project

Balunkeswar 318.083 12723.32 11.9.2013 10.9.2019

2 Laxminarayan 348.78 13951.20

3 Maa Bramhanidevi 269.279 10771.16 13.9.2013 12.9.2019

4 Maa Baraladevi 375.992 15039.68 14.9.2013 13.9.2019

5 Chakadola 333.119 13324.76 16.9.2013 15.9.2019

6 Maa Chanchaladevi 387.668 15506.72 17.9.2013 16.9.2019

2032.921 81316.84

Sl. No

Name of the Project

Name of the PP Ayacut Area in Ha.

Fund required in

Rs. @ Rs. 40/- per Ha.

Date of last

Election held

Due date of the

Election

Programme for conducting

election

1 2 3 4 5 6 7 8

1

Bagh

Barrage

Medium

Irrigation

Project

Lariababa Pani Panchayat At.Pauka Po.Sagada Dist.Boudh

143.10 5724.00 26.12.2013 25.12.2019 06/2020

2 Siddharuru Pani Panchayat At.Subha Pabuli Po.Risibandha Dist.Boudh

151.07 6042.80 27.12.2013 26.12.2019 06/2020

3 Radha Krushna Pani Panchayat At.Munipadar Po.Risibandha Dist.Boudh

365.88 14635.20 28.12.2013 27.12.2019 06/2020

4 Maa Maheswari Pani Panchayat At.Risibandha Po.Risibandha Dist.Boudh

390.77 15630.80 29.12.2013 28.12.2019 07/2020

5 Raghunath Pani Panchayat At.Mahuli Po.Risibandha Dist.Boudh

258.70 10348.00 30.12.2013 29.12.2019 07/2020

6 Sri Bijupatnaik Pani Panchayat At.Budhikon Po.Manmunda Dist.Boudh

199.69 7987.60 31.12.2013 30.12.2019 07/2020

7 Maa Kandhuni Budhi Pani Panchayat At.Manupali Po.Manupali Dist.Boudh

164.19 6567.60 3.01.2014 02.01.2020 08/2020

8 Maa Thakurani Pani Panchayat At.Jamatangi Po.Manupali Boudh

177.91 7116.40 4.01.2014 03.01.2020 08/2020

1851.31 74052.40

Page 10: ANNUUALL RREEPPOORRTT ANN - dowrodisha.gov.in

LIST OF WORK PROPOSED TO BE TAKEN UP FOR THE FINANCIAL YEAR 2020-21

Sl No Nos of Work Name of the

Scheme

Estimated

Amount /

Budget

Provision

Upto date Exp. Remarks

1 6 Nos RE (State Plan) 186.99 0.00 Work in Progess

2 8 Nos Restoration 194.36 0.00 Work in Progess

3 5 Nos RE Critical 51.57 0.00 Work in Progess

4 1 Nos NABARD WORK 70.07 0.00 Work in Progess

5 12 Nos Medium Critical 122.01 0.00 Work in Progess

6 15 Nos Major Critical 135.97 0.00 Work in Progess

7 3 Nos RCER WORK 398.06 0.00 Spill over Works

6. CONCLUSION:

It is a journey, we have to work hard in a team sprit so that we can achieve the target. The

inspiration of our authority will be helpful for our successor. Our work should be such that we will

contribute maximum to the society as well as our future generation.

Executive Engineer,

Boudh Irrigation Division,Boudh