Annual Report Liverpool City Council 2013-14

Annual Report 2013-14

Embed Size (px)

Citation preview

Page 1: Annual Report 2013-14

Annual Report

Liverpool City Council

2013-14

Page 2: Annual Report 2013-14

Hig

hlig

hts ECONOMIC DEVELOPMENT

& GROWTH

GOVERNANCE

COMMUNICATION

CAPITAL WORKS & INFRASTRUCTURE

COMMUNITY FACILITIES

ENVIRONMENT

COMMUNITY EVENTS

SAFETY

CUSTOMER SERVICE

This Annual Report is prepared by Liverpool City Council on the 28th November 2014.

Page 3: Annual Report 2013-14

Liverpool City Council Annual Report 2013-14 3

GOVERNANCE

ECONOMIC DEVELOPMENT & GROWTH

Highlights

Page 4: Annual Report 2013-14

Liverpool City Council Annual Report 2013-14 4

COMMUNICATION

CAPITAL WORKS

Page 5: Annual Report 2013-14

Liverpool City Council Annual Report 2013-14 5

COMMUNITY FACILITIES

ENVIRONMENT

Page 6: Annual Report 2013-14

Prosperous Vibrant City

Liverpool City Council Annual Report 2013-14 6

SAFETY

CUSTOMER SERVICE

COMMUNITY EVENTS

Page 7: Annual Report 2013-14

Liverpool City Council Annual Report 2013-14 7

HOW EVERY $100 YOU PAY IS SPENT

$100

Page 8: Annual Report 2013-14

ContentsContentsPreface 10Purpose of this annual report 10Council’s vision, mission and values 12 Message from the Mayor 13

Message from the Chief Executive Officer 14

Part 1 – Overview of Liverpool City Council 15Statement of Commitment 16

Liverpool City 17

Elected Council 18

Liverpool Local Government Area 20

Council Meetings 21

Council Committees 22

Partnerships and Corporations 23

Overseas Visits by Councillors and Council Staff 24

Rates and Charges Written Off During the Year 24

Senior Staff Remuneration 24

Mayoral and Councillor Fees, Expenses and Facilities 25

Organisational Structure 26

Our Staff 28

Access to Council Information 28

Commitment to Ethical Conduct 29

Community Engagement 30

Community donations and sponsorships 31

Council’s financial summary 35

Part 2 – Delivery Program achievements 38

DIRECTION 1: VIBRANT PROSPEROUS CITY 40

Year in Review 42Strategic Project Updates 44

DIRECTION 2: LIVABLE SAFE CITY 48

Year in Review 51Strategic Project Updates 54

Contents

Page 9: Annual Report 2013-14

DIRECTION 3: HEALTHY INCLUSIVE CITY 56

Year in Review 58Strategic Project Updates 61

DIRECTION 4: PROUD ENGAGED CITY 64

Year in Review 66

DIRECTION 5: NATURAL SUSTAINABLE CITY 70

Year in Review 72Stormwater management service charge 74

Strategic Project Updates 75

Environment Levy Works 77

DIRECTION 6: ACCESSIBLE CONNECTED CITY 80

Year in Review 82Managing Council Assets 85

Strategic Project Updates 90

Capital Works Project Status Report 92

DIRECTION 7: LEADING PROACTIVE COUNCIL 94Year in Review 96

Amounts Incurred in Legal Proceedings 98

Equal Employment Opportunity Plan 100

Work, Health and Safety 100

Special Rates Variation 101

Contracts Awarded by Council 107

Liverpool City Council Annual Report 2013-14 9

Page 10: Annual Report 2013-14

Liverpool City Council Annual Report 2013-14 10

This Annual Report documents Liverpool City Council’s performance over the 2013-14 financial year in relation to the Principal Activities detailed in Growing Liverpool 2023, the Delivery Program 2013-17 and Operational Plan 2013-14.

The Annual Report is made up of four parts:

PART 1

Is an overview of Liverpool City Council.

PART 2

Provides details of Council’s performance against the Delivery Program 2013-17.

PART 3

Provides additional reporting information required by legislation.

PART 4

Contains Council’s audited financial statements.

The first three parts are published in one volume. Part 4 is published individually. Hard copies of this document can be obtained by contacting Council’s Administration Centre on 1300 36 2170.

This report is prepared in accordance with Section 428 of the Local Government Act 1993 and the Division of Local Government Planning and Reporting Guidelines for Local Government in NSW.

Preface Purpose of this Annual Report

Page 11: Annual Report 2013-14

Liverpool City Council Annual Report 2013-14 11

Page 12: Annual Report 2013-14

Liverpool City Council Annual Report 2013-14 12

Council’s Vision, Mission & Values

Protect the City’s reputation and align it with the perceptions of its residents.

Decide on resources required for sustainable growth and community expectations for the future of Liverpool.

Provide purposeful and visionary leadership whilst being consultative, responsive and accessible.

Guide the City into the next century.

COUNCIL'S VALUES

At Liverpool City Council we:

1 2 3 4

Liverpool, the vibrant regional city of opportunity, prosperity and diversity

COUNCIL'S MISSION

Council’s Vision for Liverpool

Value staff by working to enable the recognition of staff performance, encouraging and supporting career development and providing continuous learning. We also recruit competent staff willing to adhere to our values while pro-actively retaining good staff.

Work together by contributing towards team goals as identified in work plans and, assisting other team members through cooperative work ethics. We also actively help other units and staff across the organisation.

Respect people by encouraging an honest, courteous, ethical, fair and equitable workplace. Valuing cultural diversity issues and understanding the views of other people is also an important component.

Communicate effectively by providing open, accessible and honest communication with all stakeholders. We also ensure all stakeholders have necessary information at their disposal.

Show leadership at all levels by being pro-active in our approach in providing excellent levels of internal and external customer service, leading by example and showing initiative and innovation.

Page 13: Annual Report 2013-14

Prosperous Vibrant CityMessage from the Mayor It gives me great pleasure to introduce

Council’s Annual Report 2013-14 and report back on the work we have carried out for you, our residents. This year saw Council leading Liverpool’s transformation as the regional city of South Western Sydney. We launched the Building Our New City initiative, a project which is aimed at positioning Liverpool to capitalise on the opportunities arising from its status as regional city. We delivered on our commitment and installed CCTV in 20 locations across the city centre. The enhanced surveillance network provides 24 hour recording of local streets, retail precincts and parks across central Liverpool. We launched free Wi-Fi in the city centre on the back of our CCTV network, the first of its kind in Australia.

Liverpool is experiencing rapid growth and record levels of investment. As the lead organisation for the city we need to ensure that we are responding to this growth effectively. Consequently, we have made improvements to the way we process development applications, introducing innovative software to fast track the time it takes to assess your application.

In April this year, at a special press conference in Liverpool, Prime Minister Tony Abbott officially announced Sydney's second airport at Badgerys Creek and a $3.5 billion road infrastructure package. This announcement is a game changer for South West Sydney and a massive win for the residents of Liverpool.

We led a campaign against the proposed intermodals at Moorebank, we believe the positioning of these intermodals along our beautiful river is out dated and destructive. We have prepared a business case on why Badgerys Creek is the best location for the intermodals. I encourage you to get involved with our #therightmove campaign and lobby for the intermodals to be moved to Badgerys Creek. For more information, visit www.liverpool.nsw.gov.au/therightmove

On behalf of Council, I extend my appreciation to our dedicated and committed staff and many partners for delivering the best possible services to our community. I encourage you to read this report and invite you to get in touch with me to discuss how Council can further deliver on your needs for this beautiful city.

Ned MannounMayor of Liverpool

Page 14: Annual Report 2013-14

Liverpool City Council Annual Report 2013-14 14

Our theme for 2013-14 was ‘Growing City’. This year Council saw significant progress on this theme to revitalise the city centre and enhance community wellbeing.

Council delivered on several of the strategies, projects and priorities which were outlined in our 2013-14 Operational Plan. Progress was made on a range of our strategic projects including the development of Carnes Hill recreation and community precinct, introduction of both a business improvement and property portfolio and launch of a state of the art community recycling centre.

Council worked hard on ensuring its financial sustainability and maintains a sound and stable financial position. In 2013-14, Council had one of the largest budgets in NSW, with an expenditure of $151.43 million including $47 million in capital works.

Liverpool is a growing city and Council must remain responsive to this change. This year alone, Council determined more than $711 million in development applications and approved more than 675 dwellings. This represents a significant investment in Liverpool’s economy and a range of services which Council must deliver.

Our facilities continued to be popular with the local community. Our libraries registered 671,715 library loans and there were more than half a million visits to our leisure centres.

Our Child care centres are performing very well, with 842 children enrolled, they cover most of the costs to operate, exceeding national child care standards and winning the Local Government Management Excellence Awards in the ‘Leadership Excellence in Community Services’ category.

Finally, I extend my thanks to the Mayor and Councillors, my executive management team, employees and all of our volunteers for their hard work, commitment and dedication in delivering essential services and making a vital contribution to the City of Liverpool.

Carl Wulff Chief Executive Officer

Message from the Chief Executive Officer

14Liverpool City Council Annual Report 2013-14

Page 15: Annual Report 2013-14

Part01.

OVERVIEW OF LIVERPOOL CITY COUNCIL

15

Page 16: Annual Report 2013-14

Liverpool City Council Annual Report 2013-14 16

We recognise the diversity of many cultures who share the values of tolerance and respect for one another, and their rights together with all Australians to live according to their own beliefs and culture.

Liverpool City Council adopts the Council for Aboriginal Reconciliation’s Vision Statement:

Statement of Commitment

Liverpool City Council acknowledges the original inhabitants of the Liverpool Local Government Area(LGA), the Dharug, Gandangara and Tharawal Aboriginal people.

We celebrate the survival of Aboriginal people and we acknowledge their right to live according to their own beliefs and culture. We acknowledge that Aboriginal culture continues to strengthen and enrich our community.

We commit ourselves to preserve past, present and future identified Aboriginal sites and cultural landscapes, and to recognise and accept the significance of the Georges River as a meeting place for the Dharug, Gandangara and Tharawal Aboriginal people.

We accept Aboriginal history as integral part of Australian history.

We acknowledge the contribution of Aboriginal servicemen and women in the defence of our country.

Liverpool City Council supports and encourages Aboriginal and non-Aboriginal people working together towards reconciliation.

“A united Australia which respects this land of ours; values the Aboriginal and Torres Strait Islander heritage; and provides justice and equity for all.”

Page 17: Annual Report 2013-14

Liverpool City Council Annual Report 2013-14 17

Liverpool City

The Liverpool City Council area is one of the largest local government areas in metropolitan Sydney, covering 305 square kilometres and 42 suburbs. In 2012-13 Liverpool’s population was more than 195,000 people from a diverse range of backgrounds.

The State Government has identified Liverpool City as the regional city for South-Western Sydney. Council is actively facilitating the ongoing development of Liverpool as a regional city through various initiatives including the night markets, Building our New city project, Safer Suburbs Project, and development of policies and plans which support culture, the art and tourism.

Liverpool is geographically positioned as the gateway to Sydney, being at the crossroads for travel to Canberra, Melbourne and Adelaide. Council’s aim is to improve the quality of life for people who live, work or visit the Liverpool area by developing a vibrant business climate where high quality jobs, education and training opportunities are located close to home.

The area has undergone significant infrastructure upgrades with the launch of the largest hospital in Australia, high-end retail facilities, schools and tertiary education facilities (including TAFE and a teaching hospital). Growth in the health and education precinct provides an excellent opportunity for future cluster growth and investment attraction. Liverpool incorporates a significant part of the South West Growth Centre and will be subject to significant urban development. It is projected that the population of Liverpool will be 239,000 by 2021.

On 15 April 2014, the Australian Government confirmed that the site for Sydney's second airport will be Badgerys Creek. Construction is expected to begin in 2016 and will be completed by mid-2020s. The airport will cement Liverpool’s position as the capital of the South Western Sydney and provide a host of economic and infrastructure benefits to Liverpool.

Page 18: Annual Report 2013-14

Liverpool City Council Annual Report 2013-14 18Liverpool City Council Annual Report 2013-14 18

Elected Council

Council has 11 elected members of Council comprising a Mayor that is elected by popular vote and 10 councillors. The local government area has two wards – north and south with five councillors representing each ward. Councillors represent the community at Council Meetings and as Council delegates on internal and external committees and boards.

Represented Council on: • Budget and Finance Committee • Casula Powerhouse Arts Centre

Board • Economic Development

Committee • Environmental Advisory

Committee • Financial Contributions Panel • Floodplain Management

Committee

• Heritage Advisory Committee • Liverpool City Centre

Revitalisation Committee • Liverpool Access Committee • Liverpool Multicultural Advisory

Committee • Liverpool Sports Committee • Liverpool Traffic Committee • Liverpool Youth Council • No Intermodal Committee

• Order of Liverpool Committee • Street Naming Committee • Tourism and Events Committee • Westpool • Western Sydney Regional

Organisations of Councils • Warwick Farm Racing Precinct

Steering Committee

Represented Council on: • Budget and Finance Committee • Economic Development

Committee • Environment Advisory Committee • Ethics and Audit Committee

• Georges River Combined Councils Committee

• Liverpool City Centre Revitalisation Committee

• Liverpool Migrant Resource Centre Management Committee

• Liverpool Multicultural Advisory Committee

• Order of Liverpool Committee • Street Naming Committee • Tourism and Events Committee

Represented Council on: • Aboriginal Consultative

Committee • Budget and Finance Committee • Joint Regional Planning Panel • Liverpool Multicultural Advisory

Committee

• No Intermodal Committee • Warwick Farm Racing Precinct

Steering Committee • Western Sydney Regional

Organisations of Councils

Represented Council on: • Budget and Finance Committee • Casula Powerhouse Arts Centre

Board • Economic Development

Committee • Liverpool Access Committee

• Liverpool City Centre Revitalisation Committee

• Liverpool Multicultural Advisory Committee

• Liverpool Youth Council • No Intermodal Committee • NSW Metro Public Libraries

Association

• The South West Sydney Academy of Sports Board

• Tourism and Events Committee • Western Sydney Regional

Organisations of Councils

Mayor Ned Mannoun

Councillor Gus Ballot

Councillor Tony Hadchiti

Councillor Sabrina Mamone

Page 19: Annual Report 2013-14

Liverpool City Council Annual Report 2013-14 19Liverpool City Council Annual Report 2013-14 19

Represented Council on: • Budget and Finance Committee • Economic Development

Committee • Environment Advisory Committee • Ethics and Audit Committee

Represented Council on: • Aboriginal Consultative

Committee • Budget and Finance Committee • Casula Powerhouse Arts Centre

Board • Economic Development

Committee

• Environment Advisory Committee • Ethics and Audit Committee • Georges River Combined Councils

Committee • Liverpool City Centre

Revitalisation Committee • Liverpool Migrant Resource

Centre

• Liverpool Multicultural Advisory Committee

• Liverpool Sports Committee • Tourism and Events Committee • The South West Sydney Academy

of Sport

Represented Council on: • Liverpool Sports Committee

Represented Council on: • Liverpool Sports Committee • Casula Powerhouse Arts Centre • Liverpool Youth Council • Liverpool Access Committee

Represented Council on: • Budget and Finance Committee • Economic Development

Committee • Environmental Advisory

Committee • Ethics and Audit Committee • Floodplain Management

Association

• Floodplain Management Committee

• Joint Regional Planning Panel(alternative)

• Liverpool Youth Council • Macarthur Bushfire Management

Committee • Macarthur Zone Bushfire Liaison

Committee

• No Intermodal Committee • Order of Liverpool Committee • Royal Fire Services(RFS)

- Macarthur Zone Liaison Committee

• Tourism and Events Committee • Warwick Farm Racing Precinct

Steering Committee

Represented Council on: • Budget and Finance Committee • Casula Powerhouse Arts Centre

Board • Economic Development

Committee • Ethics and Audit Committee

• Financial Contributions Panel • Joint Regional Planning Panel • Liverpool City Centre

Revitalisation Committee • Liverpool Sports Committee • Macarthur/Liverpool Regional

Advisory Council

• Order of Liverpool Committee • Tourism and Events Committee

Represented Council on: • Tourism and Events Committee

Councillor Geoff Shelton

Councillor Peter Ristevski

Councillor Anne Stanley

Councillor Wendy Waller

Councillor Peter Harle

Deputy Mayor Mazhar Hadid

Councillor Ali Karnib

Page 20: Annual Report 2013-14

20

!

!

!

NORTHERN

ROAD

CREEK

ROAD

ROAD

RO

AD

DEVONSHIREKING

FIFT

EEN

TH

AVE

NU

E

HO

XTO

NP

AR

KR

OA

D

CAMDEN

VALL

EY

WAY

ELIZ

ABE

TH

DRIV

E

FRE

EWAY

SOT

WES

TERN

SOUT

H

MO

TOR

WA

YW

EST

ER

N

HU

ME

HIGHWAY

HUME

HIGHWAY

NE

WB

RID

GE

ROAD

BRIN

GEL

LY

COWPASTURE

ELIZABETH

DR

.

GO

VE

RN

OR

MA

CQ

UA

RIE

DRIVE

RO

AD

HEATHCOTE

STREET

ROAD

FLOWERDALEROAD

NUWARRAROAD

HEATHCOTE

ROAD

WES TLINK

M7

M7

W

ESTLIN

K

BADGERYS

RO

AD

GREENDALE

ROAD

GREENDALE

THE

HUME

HIG

H

W

AY

WESTLINK M7

WA

RW

ICK

FAR

M

KEM

PSCR

EEK

BADG

ERYS

CREE

KCE

CIL

PARK

AUST

RAL

ROSS

MOR

E

BRIN

GELL

Y

GREE

NDAL

ESI

LVER

DALE

WAL

LACI

ALU

DDEN

HAM

CECI

LHI

LLS

ELIZ

ABET

HHI

LLS

GRE

ENVA

LLEY

MID

DLET

ONGR

ANGE

HINC

HINB

ROOK

HECK

ENBE

RG

ASHC

ROFT

SADL

EIR

HAM

MON

DVIL

LE

WAT

TLE

GROV

E

CHIP

PING

NORT

ON

WAR

WIC

KFA

RM

VOYA

GER

POIN

T

PLEA

SURE

POIN

T

MOO

REBA

NK

HOLS

WOR

THY

HOLS

WOR

THY

MIL

ITAR

YBA

RRAC

KS

SOUT

H W

EST

GROW

TH

CENT

RE A

REA

CART

WRI

GHT

LURN

EA

CASU

LA

LIVE

RPOO

L

PRES

TONS

EDM

ONDS

ONPA

RK

DENH

AMCO

URT

WES

THO

XTON

LEPP

INGT

ON

HOXT

ONPA

RK

CARN

ESHI

LLLEN

WAT

ERS

ESTA

TE

HORN

INGS

EAPA

RK

Rose

dale

Ova

l

Erni

e Sm

ith R

eser

ve a

nd H

ocke

y Co

mpl

ex

Chip

ping

Nor

ton

Lake

s

War

wic

k Fa

rm R

ace

Cour

se

Hols

wor

thy

Swim

min

g Ce

nter

Helle

s Pa

rk W

ater

skiin

g

Whi

tlam

Lei

sure

Cen

tre

Mic

hael

Wen

den

Leis

ure

Cent

re

Golf

cour

se

Gree

nway

Par

k

Reta

il Ce

ntre

Spor

ting

Oval

Casu

la P

ower

hous

e Ar

ts C

entre

Live

rpoo

l Mus

eum

Bent

s Ba

sin

Hols

wor

thy

Mill

itary

Res

erve

Live

rpoo

l hos

pita

l

Ingh

am In

stitu

te

Trai

n St

atio

n

St L

ukes

Ang

lican

Chu

rch

Carn

es H

ill R

ecre

atio

n Pr

ecin

ct

Badg

ery’s

Cre

ek A

irpor

t Site

Rura

l Are

a

City

Cen

tre

Eliz

abet

h D

rive

Nor

th L

iver

pool

Roa

d

HOLS

WOR

THY

Liverpool Local Government Area

20Liverpool City Council Annual Report 2013-14

Page 21: Annual Report 2013-14

Liverpool City Council Annual Report 2013-14 21

10 Council Meetings and

7 Extraordinary Council Meetings WERE HELD DURING THE PERIOD

Liverpool City Council Annual Report 2013-14 21

Council meets monthly. Dates are set by a resolution of Council and advertised in the local newspapers and on Council’s website. Council meetings are open to all members of the public. Under the provisions of the Local Government Act 1993, some sections of a meeting may be closed to discuss matters such as legal proceedings and commercial in confidence issues, however the resolutions from these items are always made public.

All Council Meeting agendas, reports and minutes are published on Council’s website.

Ten ordinary Council Meetings and seven Extraordinary Council Meetings were held during the year. Attendance of Councillors at these meetings is summarised in the following tables.

COUNCILLOR COUNCIL MEETINGS ATTENDED

EXTRAORDINARY COUNCIL MEETINGS ATTENDED

Mayor Ned Mannoun 10 6

Deputy Mayor Mazhar Hadid 10 6

Clr Gus Balloot 9 3

Clr Tony Hadchiti 10 7

Clr Peter Harle 10 6

Clr Ali Karnib 10 7

Clr Sabrina Mamone 8 7

Clr Peter Ristevski 9 4

Clr Geoff Shelton 10 7

Clr Anne Stanley 10 6

Clr Wendy Waller 8 3

Council Meetings

Page 22: Annual Report 2013-14

Liverpool City Council Annual Report 2013-14 22

Council Committees

Council has established a number of committees that provide advice to Council on a range of community matters. Most of the committees are made up of community representatives and at least one Councillor. They meet on a regular basis and are governed by a charter which is endorsed by Council.

The following committees were held during the year:

Aboriginal Consultative Committee

Budget and Finance Committee

Building our New City Committee

Casula Powerhouse Arts Centre Board

Economic Development Committee

Environment Advisory Committee

Ethics and Audit Committee

Heritage Advisory Committee

Liverpool Access Committee

Liverpool Advisory Forum

Liverpool Sports Committee

Liverpool Youth Council

Master Planning Steering Committee

No Intermodal Committee

Order of Liverpool Advisory Committee

Street Naming Committee

Tourism and Events Committee

Warwick Farm Racing Precinct Steering Committee

Page 23: Annual Report 2013-14

Liverpool City Council Annual Report 2013-14 23

Partnerships and Corporations

Council staff and Councillors were involved in a number of external committees that deal with issues that impact Liverpool. Councillor representation on external committees is as follows:

EXTERNAL COMMITTEE /AFFILIATED BOARDS COUNCIL REPRESENTATIVE/S

Georges River Combined Councils Committee Councillor Peter Ristevski

Joint Regional Planning PanelDeputy Mayor Mazhar HadidCouncillor Tony HadchitiCouncillor Peter Harle

Liverpool Migrant Resource Centre Management Committee Councillor Gus Balloot

Liverpool Traffic Committee Mayor Ned Mannoun (or delegate)

Macarthur/Liverpool Regional Advisory CouncilDeputy Mayor Mazhar HadidCouncillor Ali Karnib

Macarthur Bushfire Management Committee Councillor Peter Harle

NSW Metro Public Libraries Association Councillor Tony Hadchiti

Royal Fire Service (RFS) – Macarthur Zone Liaison Committee Councillor Peter Harle

The South West Sydney Academy of Sport Councillor Peter Ristevski

WESTPOOL Mayor Ned Mannoun (or delegate)

Western Sydney Regional Organisation of Councils Councillor Tony Hadchiti

During 2013-14, Council was engaged in resource sharing with a number of organisations including other councils and state government bodies as follows:

• Be Sharp Be Safe Community Sharps Management • Chemical Cleanout • Floodplains Management Authority NSW • Georges River Combined Councils Committee • Liverpool Local Emergency Management Committee • Macarthur Bushfire Management Committee • Western Sydney Regional Illegal Dumping Squad

Council did not have a controlling interest in any companies during the year.

Page 24: Annual Report 2013-14

Liverpool City Council Annual Report 2013-14 24

Overseas Visits by Councillors and Council Staff

Liverpool City Council Annual Report 2013-14 24

Rates and Charges Written Off During the Year

POSITION REMUNERATION LESS FBT ( GROSS+SUPER+CAR) FBT

General Manager $353,182 $17,141

March 2014 to June 2014General Manager(Acting)

$84,730 0

Senior Staff Remuneration $2,146,439 $138,368

Councillor Gus Balloot attended the 8th APEC Small and Medium Enterprise Technology Conference (APEC SMETC) from June 19 to 22 in Yiwu and Beijing. The majority of Councillor Ballot’s expenses were self-funded, however incidental expenses of $1,633 were reimbursed by Council.

Senior Staff Remuneration

Council has made no provision for impairment of Rates and Annual Charges. Any unpaid debts represent a charge against the rateable property and recoverable when the property is next sold.

As at 30 June 2014 the General Manager’s and Senior Staff total remuneration, including salary, bonus payments, superannuation and motor vehicle is detailed below:

Page 25: Annual Report 2013-14

Liverpool City Council Annual Report 2013-14 25

Mayoral and Councillor Fees, Expenses and Facilities

MAYORAL AND COUNCILLOR FEES & FACILITIES FEES

Total Mayor $81,340

COUNCILLORS

Total Councillors $222,400

COUNCILLORS EXPENSES

Joint Regional Planning Panel Allowance $7,800

Dedicated Office Equipment $237

Mobile phone Expenses $15,201

Postage $701

Conference and seminars $64,896

Training $19,759

Interstate Visits 0

Overseas visits $1,633

Partner/spouse expenses 0

Provision for Childcare 0

Miscellaneous $3,097

Total Councillor Expenses $113,324

Page 26: Annual Report 2013-14

Liverpool City Council Annual Report 2013-14 26

The Chief Executive Officer (CEO) is the General Manager of Council. The CEO leads the implementation of Council’s strategic objectives and ensures that Council’s decisions are turned into action. The CEO’s responsibilities include the effective and efficient operation of Council, employment of Council staff and management of resources.

The Chief Financial Officer and Directors provide strategic leadership and guidance. They also provide professional, positive staff and workplace leadership by creating and maintaining an environment where staff are valued, challenged and inspired to achieve strategic objectives.

Council’s organisational structure as at June 2014 is shown below.

Organisational Structure

INFRASTRUCTURE & ENVIRONMENT

PLANNING & GROWTH

CITY PRESENTATION

ECONOMY & ENGAGEMENT

COMMUNITY & CULTURE

PROPERTY & COMMERCIAL DEVELOPMENT

CORPORATE SERVICES

DIRECTOR DIRECTOR DIRECTORDIRECTOR DIRECTOR DIRECTOR CHIEF FINANCIAL OFFICER

Infrastructure delivery

Accessible transport

Environmental protection and sustainability

Sustainable urban growth

Efficient development process

City centre development

Clean city

Maintained city

Accessible open space

Waste services

Economic growth

Community events

Community engagement and development

Informed city

Quality services and activities

Efficient service delivery

Customer service

Commercial property management

Leases

Licences

Disposal of property

Financial sustainability

Employer of choice

Technology & information

management

Statutory compliance & eithical government

Leadership support

Corporate strategy

CHIEF EXECUTIVE OFFICER INTERNAL

AUDITBUSINESSES

IMPROVEMENT

COUNCIL COMMITTEES

MAYOR & COUNCILLORS

RESIDENTS AND RATEPAYERS

BUSINESS

WORKERS AND STUDENTS

GOVERNMENTS

PARTNERS AND NEIGHBOURS

Page 27: Annual Report 2013-14

Liverpool City Council Annual Report 2013-14 27

LEADERSHIP

COMMUNITY

VISIONLiverpool, the

vibrant regional city of opportunity,

prosperity and diversity.

Our Principles Our Directions

INNOVATION

EXCELLENCE

EQUITY

PARTNERSHIP

SUSTAINABILITY

Direction 1: Vibrant Prosperous City

Direction 2: Liveable Safe City

Direction 3: Healthy Inclusive City

Direction 4: Proud Engaged City

Direction 5: Natural Sustainable City

Direction 6: Accessible Connected City

Direction 7:Leading Proactive Council

Page 28: Annual Report 2013-14

Liverpool City Council Annual Report 2013-14 28

Our Staff

Access to Council Information

Council facilitates public access to information in accordance with the Government Information (Public Access) Act 2009. During 2013-14, Council processed 810 informal requests for information. Of the 59 formal access applications, only 2 were refused. Applications for information are only refused if there is an overriding public interest against disclosure.

Council’s release of informationDuring the year, Council proactively released information on its website, including Council Meeting Agendas, Minutes of Council and committee meetings, policies and plans, Development Applications lodged and register of delegations and contracts register.

AT THE END OF JUNE 2014, COUNCIL EMPLOYED

772 Staff

697 Full time staff

and 75Casual staff

Page 29: Annual Report 2013-14

Liverpool City Council Annual Report 2013-14 29

Commitment to Ethical Conduct

Council’s commitment to ethical governance is demonstrated by its adoption and review of the following governance policies during 2013-14:

• Agency Information Guide • Civic Expenses Policy • Councillor Access to Information and Interaction with Staff Policy

• Customer Feedback Policy • Customer Service and Communication Policy • Code of Conduct • Code of Conduct Procedures • Code of Meeting Practice • Ethical Governance: Conflicts of Interest Policy • Ethical Governance: Gifts and Benefits Policy • Ethical Governance: Internal Reporting (Public Interest Disclosures) Policy

• Ethical Governance: Secondary Employment Policy • Public Safety Closed Circuit Television (CCTV) Code of Practice and Standard Operating Procedures.

Code of ConductThe Code of Conduct assists Councillors, Council staff, members of Council committees and Council contractors to:

• Understand the standards of conduct that are expected of them

• Fulfil their statutory duty to act honestly and to exercise a reasonable degree of care and diligence

• Act in a way that enhances public confidence in the integrity of local government.

Public interest disclosuresCouncil does not tolerate corrupt conduct, maladministration or serious and substantial waste of public money, government information contravention or local government pecuniary interest contravention.

Council’s Ethical Governance: Internal Reporting(Public Interest Disclosures) Policy provides an internal system for the reporting of disclosures of corrupt conduct, maladministration or serious and substantial waste of public money, government information contravention and local government pecuniary interest contravention by Liverpool City Council, members of Council staff and Councillors.

There were two public interest disclosures this year.

Conflicts of interestCouncillors, Council committee members and members of Council staff must declare a conflict of interest if their private interest in a particular matter before Council appears to conflict with their public duty. During 2013-14, there were:

• 4 declarations of non-pecuniary interests by Council staff

• 60 declarations of non-pecuniary interests by Councillors.

All declarations were managed and recorded in accordance with the Code of Conduct and the Ethical Governance: Conflicts of Interest Policy.

Page 30: Annual Report 2013-14

Community Engagement

Council has a number of strategies in place to engage with the community and ensure that the community is aware and involved in Council’s operations. These include:

• Holding a regular Mayoral Mobile Office • Placing draft plans, strategies and policies on public exhibition • Ensuring information on the website is relevant and up to date • Distributing regular newsletters to households • Facilitating Council committees • Hosting engagement booths at different locations across Liverpool and at community events • Organising Public Meetings on topical issues • Facilitating Customer Service and Developer Focus Groups • Facilitating monthly Community Forums, both rural and urban • Using social media forums such as Facebook and Twitter • Undertaking an annual community telephone survey

Liverpool City Council Annual Report 2013-14 30

Page 31: Annual Report 2013-14

Liverpool City Council Annual Report 2013-14 31

Community Donations and Sponsorship

In 2013-14, $266,870 was provided to community groups, organisation and individuals in accordance with Section 356 of the Local Government Act 1993. The recipients and funding received by each are detailed in the following table.

COMMUNITY DONATIONS AMOUNT

Liverpool Neighbourhood Connections $11,433

Karitane $9,983

South West Community Transport $6,500

Les Powell School $6,500

The Potters House Christian Centre $5,263

Liverpool Migrant Resource Centre $5,000

Treehouse Theatre $5,000

La’u Samoa Council $5,000

Sloosh Kidscare $4,995

Miller Art & Fact $4,826

The Probus Club of Liverpool City $4,128

City of Liverpool Meals on Wheels $3,500

Liverpool Fairfield Community Radio Co-op $3,500

The Junction Works $3,435

Liverpool U3A – School for Seniors $1,252

Total $80,315

Page 32: Annual Report 2013-14

Liverpool City Council Annual Report 2013-14 32

CORPORATE SPONSORSHIP AMOUNT

Shree Sanatan Dharm Pradtinidhi Sabha of Australia ($6,000 donation in addition to $5,400 in-kind support)

$11,400

Big Picture Film Festival ($6,500 donation in addition to $1,000 in-kind support) $7,500

Cancer Council ($1,000 donation in addition to $5,400 in-kind support) $6,400

Vedic Festival ($5,000 donation in addition to $650 in-kind support) $5,650

Australian Turf Club $5,000

NSW Business Chamber $5,000

Share Care Incorporated $5,000

Desi Media Group $3,000

The Eid Festival In The Park $3,000

Eggtober Foundation $2,500

Precedent Productions $2,225

Team Gong Ballistic $2,000

Tank U Pty Ltd: Australian Fighters and Martial Arts $1,000

Hoxton Park Public School Parents and Citizens $1,000

Total $ 60,675

ENVIRONMENT GRANTS AMOUNT

Moorebank Sports Club Limited $5,000

William Carey Outside School Hours Care $5,000

Christadelphian Heritage College Sydney $5,000

Heckenberg Public School $4,000

Australian Foundation for Disability $3,000

Vishwa Hindu Parishad of Australia $3,000

All Saints Catholic Primary School $3,000

Casula Public School $3,000

Liverpool West Public School $3,000

Community Donations and Sponsorship (continued...)

Page 33: Annual Report 2013-14

Liverpool City Council Annual Report 2013-14 33

ENVIRONMENT GRANTS AMOUNT

Outer Liverpool Community Service $2,400

Cecil Hills Public School $2,170

Tafe NSW South Western Sydney Institute - Outreach $1,760

Lurnea High School $1,550

Total $41,880

DONATIONS TO SPORTING ORGANISATIONS AMOUNT

Bringelly Netball Club $5,000

Southern Districts Soccer Football Association $5,000

Liverpool Primary Schools Sports Association $5,000

Moorebank Sports Netball Club $3,618

Southern Districts Softball Association $2,932

Chipping Norton Baseball Club $2,929

Prestons Robins Little Athletics $2,500

South West Tigers Junior AFL Club $1,414

Moorebank Liverpool District Hockey Club $1,290

Australian Barefoot Water Ski Club $317

Total $30,000

SPORT DONATIONS TO INDIVIDUALS AMOUNT

Total $9,000

YOUTH DONATIONS AMOUNT

Total $1,600

Page 34: Annual Report 2013-14

Liverpool City Council Annual Report 2013-14 34

SCHOOL DONATIONS AMOUNT

Al Amanah College $100

All Saints Senior College $100

Ashcroft High School $100

Casula High School $100

Cecil Hills High School $100

Christadelphian Heritage College $100

Holsworthy High School $100

Hoxton Park High School $100

James Busby High School $100

John Edmondson High School $100

Lawrence Hargrave School $100

Liverpool Girls High School $100

Miller Technology High School $100

Moorebank High School $100

Total $1,400

OTHER AMOUNT

Liverpool District Men’s Shed Incorporated $20,000

Moorebank Men’s Shed $20,000

Savavali ile Malamalama Samoan & Multicultural Liverpool $2,000

Total $42,000

Donations Annual total for 2013-14 $266,870

Community Donations and Sponsorship (continued...)

Page 35: Annual Report 2013-14

Liverpool City Council Annual Report 2013-14 35

Council’s Financial Summary

Council’s financial position as at 30 June 2014 was sound and stable.

Income Statement The income statement shows Council’s income and expenditure during the 2013-14 financial year and is calculated using the following formula:

Total revenue - Total expenses = Net result

The operating surplus in 2013-14 was $34.5 million. This does not necessarily mean there is a surplus of funds that can be used for Council operations or future capital expenditure. Some of the net result is made up of funds which have been set aside for a specific purpose and “Non-Cash” revenue. During 2013-14 these included:

• Non–Cash revenue of $11 million from road reserves dedicated by developers to Council at Moorebank, Carnes Hill, and Middleton Grange. The value of these assets is included as revenue (these are non-cash revenues and do not represent funds available for Council operations or future capital expenditure).

• $1.4 million “in kind” contributions from developers (value of works completed at the developer’s expense in lieu of a Section 94 cash contribution).

• Recognition of an in-kind capital contribution valued at $1.2 million for the site adjoining Bigge Park (former Liverpool Bowling Club) to which Council has full care and control.

• $23.7 million in Section 94 contributions by developers to fund future infrastructure associated with new development (Council is restricted as to how it may use these funds).

SNAPSHOT$185.9 million income from Continuing Operations

$47 million capital expenditure (including $11 million dedication from road reserves)

Rates and Charges comprised $101.6 million (54.6 per cent) of the total income from Continuing Operations

$5.1 million Financial Assistance Grant (FAG) received during the year

Operating Surplus (after Capital receipts) $34.5 million

Net Operating Result excluding Capital receipts is deficit of $8.3 million

Cash reserves increased by $24 million

$11 million road reserve dedicated to Council in new land release areas

Council’s Asset Renewal Gap reduced from $207 million to $63 million following an independent assessment.

TOTAL REVENUE – TOTAL EXPENSES = NET RESULT

Page 36: Annual Report 2013-14

Sourcing our revenue

Council had $185.9 million in revenue during 2013-14. The largest contributions to revenue were provided by general rates, capital grants and contributions.

WHERE OUR MONEY CAME FROMNET SHARE

INTEREST IN JOINT VENTURES

$14070.22%

GENERAL RATES

$76,98141.41%

OTHER RATES & CHARGES

$24,61613.25%

USER CHARGES & FREE

$12,8156.89%

INTEREST & INVESTMENT

$12,8153.6%

OTHER REVENUES$9,4005.06%

OPERATING GRANDS & CONTRIBUTIONS

$11,6136.25%

CAPITAL GRANDS & CONTRIBUTIONS

$72,71522.98%

NET GAIN ON SALE OF ASSETS

$6500.35%

Identifying our expenses

The majority of Council’s $151.4 million expenditure is spent on employee costs, depreciation, materials and contracts. This year, Council’s total gross expenditure increased by approximately by 4.9 per cent. This was mainly due to a 7.1 per cent increase in employee cost, 6.1 per cent depreciation expense and 4.7 per cent increase materials and contracts during the year.

WHERE OUR MONEY WAS SPENT

EMPLOYEE COSTS$54,91136.26%

DEPRECIATION & AMORTISATION

$34,59622.85%

OTHER EXPENSES$11,6047.31%

BORROWING COSTS$2,5581.69%

MATERIALS & CONTRACTS

$48,30031.9%

Council’s Financial Summary (continued...)

Liverpool City Council Annual Report 2013-14 36

Page 37: Annual Report 2013-14

Liverpool City Council Annual Report 2013-14 37

Balance SheetThe balance sheet shows what we own (our assets) and what we owe (our liabilities) and our net worth.

Assets – what we ownAs at 30 June 2014, Council held assets worth $1.9 billion. The major components of our assets include:

• property, plant and equipment (land, buildings, roads, stormwater drainage, motor vehicles, trucks and other plant items)

• capital works in progress

• investment properties

• cash and investments

Revaluation of AssetsCouncil is required by the Office of Local Government (OLG) to re-value its assets at ‘Fair Value’ every five years and on a cyclical basis for each major asset class in accordance with Australian Accounting Standard AASB116.

For the financial year ending 30 June 2014, Council re-valued Land Under Roads (LUR) acquired after 1 July 2008. The re-valuation was based on the external Section 94 land valuation rate per square metre. Through this process, council recognised a re-valuation gain of $113,000 for Land Under Roads.

Capital expenditure disposalIn 2013-14, Council spent $47 million on capital works and infrastructure assets. This includes $11 million from road reserves dedicated to Council from developers in new land release areas.

Council also disposed of three properties which generated $7.3 million in income which was transferred to reserves as follows:

• Property Development Reserve - $445,275

• Iconic Development Reserve - $6,800,098

Reviewing our liabilities – what we oweCouncil’s liabilities include debt, amounts owed to suppliers and amounts owed to employees for leave entitlements. Council’s total liabilities in 2013-14 were $75.1 million. This represents a 2.6 per cent decrease from the previous year. The decrease is mainly due to a decrease in outstanding loans by $4.4 million.

Cash reservesCouncil’s cash holdings increased by $24 million in 2013-14, with an increase of $12.1 million in external restrictions and an increase of $9.7 million in internal restrictions. Unrestricted funds increased by $2.2 million.

CASH RESERVES 2009-2014 ($MILLION)

ConclusionCouncil is continuing to work to ensure it is in a strong financial position to provide for the present and future needs of our growing community, including:

• Implementation of a new organisational structure to better align its services to meet community expectations in accordance with the requirements of the Office of Local Government (OLG).

• Development of a 10-year Community Strategic Plan supported by a Resourcing Strategy consisting of a Long Term Financial Plan, an Asset Management Plan and a Workforce Management Plan. These plans assist Council to inform all stakeholders of what is required to ensure a financially sustainable Regional City for all residents as it look towards the future.

• The establishment of a business improvement portfolio to identify operational efficiencies and streamline service delivery and property portfolio to carry out Council’s regulatory functions and to maximise opportunities around commercial holdings.

• Conducting several internal service reviews to identify operational efficiencies and streamline service delivery.

2014

External Internal Unrestricted

2013 2012 2011 2010 2009

90,000

80,000

70,000

60,000

50,000

40,000

30,000

20,000

10,000

0

Page 38: Annual Report 2013-14

Liverpool City Council Annual Report 2013-14 38

Part02.

DELIVERY PROGRAM ACHIEVEMENTS

Page 39: Annual Report 2013-14

Liverpool City Council Annual Report 2013-14 39

Part02.

Future Directions

The Growing Liverpool 2023 10-year plan concentrates on seven key strategic directions to move Liverpool forward. The directions are based on feedback from the community, stakeholders and leaders, and incorporate local, regional, state and national priorities for Liverpool.

LEADERSHIP

COMMUNITY

VISIONLiverpool, the

vibrant regional city of opportunity,

prosperity and diversity.

Our Principles Our Directions

INNOVATION

EXCELLENCE

EQUITY

PARTNERSHIP

SUSTAINABILITY

Direction 1: Vibrant Prosperous City

Direction 2: Liveable Safe City

Direction 3: Healthy Inclusive City

Direction 4: Proud Engaged City

Direction 5: Natural Sustainable City

Direction 6: Accessible Connected City

Direction 7:Leading Proactive Council

Page 40: Annual Report 2013-14

40

This direction is about developing and supporting a robust local economy and vibrant and dynamic public spaces that attract business, jobs and investment.

Direction 01.

Vibrant Prosperous City

Page 41: Annual Report 2013-14

41

Direction 01. Vibrant Prosperous City

PROGRESS AGAINST PRINCIPAL ACTIVITIES

City MarketingAll 8 actions were on track/completed

Economic developmentAll 8 actions were on track/completed

1 year Actions

STRATEGIC PROJECTS PROJECT NAME STATUS

City Centre Revitalisation In progress and carried Project over to 2014-15. The next phase is the 'Building Our New City' project

10-YEAR STRATEGIESPosition Liverpool as the destination of choice to attract business and investment in South Western Sydney.

Activate the city centre and develop vibrant places that attract people to Liverpool.

Assist existing businesses to grow, innovate and become competitive.

Improve the availability of a diverse range of jobs and increase workforce participation rates.

10-YEAR COMMUNITY GOALSThese are the goals for the city of Liverpool. Everyone has a role in achieving these goals, whether they are a government department, business or resident in Liverpool.

INCREASED GROSS REGIONAL PRODUCT (GRP)$7.8 billion in 2010-11 (Source: Liverpool Economic Profile, 2013)

REDUCED UNEMPLOYMENT RATE7.3% as at Dec 2013 (Source: Small Area Labour Markets Report)

10,000 ADDITIONAL JOBS IN LIVERPOOL1366 additional jobs were created in 2013-2014

100% on

track

Liverpool City Council Annual Report 2013-14

Page 42: Annual Report 2013-14

Liverpool City Council Annual Report 2013-14 42

Badgerys Creek Airport Following an extensive community consultation with more than 2,000 residents, Council resolved to support the development of the second Sydney airport at Badgerys Creek. On 15 April 2014, Prime Minister Tony Abbott officially announced the airport and a $3.5 billion road upgrade infrastructure package at a press conference in Liverpool.

The Year in Review

Attracting Jobs and Investment The State Government announced a commitment of 5,000 square meters of commercial floor space for use by government agencies in Liverpool. Subsequently, the NSW Department of Community Relations Commission and parts of Family and Community Services will be relocated to Liverpool.

Economic Development Strategy (2013-2018)Council’s Economic Development Strategy was launched on 18 September 2013 at Casula Powerhouse Arts Centre. The Strategy provides the blue-print for economic development in Liverpool for the next 4 years.

Branding Strategy Work commenced to develop a branding strategy which aims to improve perceptions of Liverpool and promote Liverpool as a place to do business and invest.

Education and Employment Expo Liverpool’s 2168 Education and Employment Expos were held on 19 September 2013 at the TAFE NSW Miller Campus and on 8 May 2014 at Miller College. Approximately 1,000 students and job seekers attended the two expos.

Page 43: Annual Report 2013-14

Liverpool City Council Annual Report 2013-14 43

Job Creation Council assisted several companies to create and retain jobs. One thousand three hundred and sixty six (1,366) additional jobs were created during 2013-14 including 390 at the new Costco Warehouse, 225 at Transit System, 200 at Mayo and 150 at Masters Home Improvement.

Night MarketsThe 12 month Liverpool Markets trial was launched on 3 May, 2014 at Macquarie Street, Liverpool. The first market attracted more than 2,500 visitors with 18 stalls, while the second market held on 7 June, 2014 had 1,500 visitors and 26 stalls.

Economic Development A range of marketing materials were developed to encourage economic development in Liverpool including:

• ‘Invest Liverpool’ brochures to encourage investment and public sector relocation in Liverpool.

• A business toolkit for businesses which provides information on government business assistance programs, contact details of government agencies, and links to a wide range of free resources covering topics such as starting a business, business planning and finance.

• A Liverpool Business Connect e-newsletter which provides information on the latest business developments, upcoming events and opportunities in Liverpool.

• Case studies on seven businesses in Liverpool to promote the depth and breadth of industries in Liverpool.

Page 44: Annual Report 2013-14

Liverpool City Council Annual Report 2013-14 44

Major Development Application Approvals

Council has actively worked to attract growth and investment to Liverpool. Major developments which were approved in 2013-14 include:

DESCRIPTION VALUE

Construction of a ten storey hotel and alterations to an existing hotel in Prestons. $34.3mConstruction of the Carnes Hill Recreation and Community Precinct $33.3mA 14-storey residential flat building on the Hume Highway in Warwick Farm $24.9mConstruction and refurbishment of an industrial warehouse including associated works at Bernera Road, Prestons

$19.9m

Staged subdivision in 6 stages creating 257 residential lots and 12 residue lots with associated infrastructure at Camden Valley Way, Edmondson Park.

$12.9m

Construction of a part nine storey and part ten storey residential flat building at Speed Street, Liverpool

$12.3m

Construction of a nine storey mixed-use development including forty six residential units and three retail tenancies at Castlereagh Street, Liverpool.

$9.2m

Development of an eight storey mixed-use development comprising ground floor retail/commercial and 50 residential units in Macquarie Street, Liverpool

$8.3m

Development of an industrial building comprising 3 units at Prestons. $3.2mRefurbishment of an existing building to develop a retail centre and construction of a new car park at Warwick Farm.

$3.1m

Page 45: Annual Report 2013-14

Liverpool City Council Annual Report 2013-14 45

2013-14: 1,423 DAs lodged

1,245 DAs determined

675 new residential dwelling approved

$711m in total value

Development and Investment

DEVELOPMENT APPLICATIONS Sep Qtr Dec Qtr Mar Qtr Jun Qtr

DEVELOPMENT APPLICATIONS LODGED 411 346 343 323

DEVELOPMENT APPLICATIONS DETERMINED 303 410 296 236

NEW RESIDENTIAL DWELLINGS APPROVED 135 250 178 112

VALUE OF DEVELOPMENT APPLICATIONS LODGED $172m $135m $178m $226m

Sep Qtr Dec Qtr Mar Qtr Jun Qtr

450

400

350

300

250

200

150

100

50

0

450

400

350

300

250

200

150

100

50

0

Number $ Millions

▶ Development applications lodged▶ Development applications determined▶ New residential dwellings approved Value of development applications lodged (in millions)

Page 46: Annual Report 2013-14

Liverpool City Council Annual Report 2013-14 46

City Centre Revitalisation Project

This project developed and commenced implementation of a strategy which was aimed at revitalising Liverpool’s city centre and positioning Liverpool to capitalise on the opportunities arising from its status as the regional city of South Western Sydney.

The City Centre Revitalisation Project resulted in the development of the Building Our New City initiative. More information on Building Our New City is outlined in Council’s Delivery Program and Operational Plan 2014-15.

Key deliverables for 2013-14 include:

Urban Design Symposium An Urban Design Symposium was held in August 2013. The symposium gathered a range of specialist, stakeholder and community perspectives as input for revitalisation of the Liverpool City Centre.

Key focus areasThe concept designs for 5 precincts including City Nerve Centre, Macquarie Mall, Gateways, City Eat Street and Urban Breathing spaces are currently being finalised.

City Centre traffic studyA City Centre Traffic Study was completed in June 2014 to identify improvements to the city centre road network.

Review of planning controlsA review of Council’s current planning controls was undertaken to complement the urban design projects. The review will provide a planning framework for the City Centre.

City Centre events and activities A range of city centre events were held to enliven the city centre. These include Starry Sari Night, the Spring Garden Expo, Liverpool Stories, installation of new banners and exercise programs in Bigge Park.

Page 47: Annual Report 2013-14

Liverpool City Council Annual Report 2013-14 47Liverpool City Council Annual Report 2013-14 47

Page 48: Annual Report 2013-14

48

Direction 02.

Livable Safe City

This direction is about planning for sustainable urban development, and revitalising Liverpool’s towns and public spaces to create livable and safe neighbourhoods that connect and bring people together.

Page 49: Annual Report 2013-14

Liverpool City Council Annual Report 2013-14 49

Direction 02. Livable Safe City

PROGRESS AGAINST PRINCIPAL ACTIVITIES

Animal Management4 actions were on track/completed

Community Safety5 actions were on track/completed

1 action is in progress/carried over to next year

1 action will not be completed

Emergency ServicesAll 6 actions were on track/completed

Public & Open Space AmenityAll 11 actions were on track/completed

Regulatory Services5 actions were on track/completed

2 actions are in progress/carried over to next year

Urban Planning13 actions were on track/completed

1 action is in progress/carried over to next year

1 year Actions

10-YEAR STRATEGIESDeliver an efficient planning system which embraces sustainable urban renewal and growth.

Create clean and attractive public places for people to engage and connect.

Improve the community’s sense of safety in Liverpool.

Facilitate affordable and diverse housing options.

STRATEGIC PROJECTS PROJECT NAME STATUS Closed Circuit Television Completed

Development Application Completed Reform Project

10-YEAR COMMUNITY GOALSThese are the goals for the city of Liverpool. Everyone has a role in achieving these goals, whether they are a government department, business or resident in Liverpool.

85% OF PEOPLE REPORT BEING SATISFIED OR BETTER WITH CLEANLINESS OF PUBLIC SPACES 76% of people as at December 2013. (Source: Annual Telephone Survey)

85% OF PEOPLE FEELING SAFE IN THE COMMUNITY 62% felt safe as at December 2013 (Source: Annual Telephone Survey)

AN INCREASE IN DIVERSE HOUSING OPTIONS(Data not yet available)

8% delayed

92% on

track

Page 50: Annual Report 2013-14

Liverpool City Council Annual Report 2013-14 50

COMMUNITY SAFETY

SINCE 2010 NON-DOMESTIC VIOLENCE ASSAULTS HAVE DECREASED BY

14.1% AND THE PERCENTAGE OF PEOPLE WHO FEEL SAFE WHEN USING THEIR LOCAL PARK HAS

INCREASED.

Annual Statistics

1000

900

800

700

600

500

400

300

200

100

0

100%

90%

80%

70%

60%

50%

40%

30%

20%

10%

0%2010

NON DV ASSAULTS

FEEL SAFE WHEN USING PARK

71%

2011

67%

2012

65%

Page 51: Annual Report 2013-14

Liverpool City Council Annual Report 2013-14 51

Health Inspections Council carried out 1,688 health inspections

Community Meetings Council facilitated several community forums on important community issues including:

• A roundtable aimed at encouraging dialogue between key stakeholders to discuss methadone use in the Liverpool City Centre and

• An affordable housing forum to discuss the opportunities and challenges for the delivery of affordable housing in March 2014.

Infrastructure for new developmentsThe Section 94 Plan for Austral and Leppington North was prepared this year. The Section 94 Plan for East Leppington was also reviewed. These plans establish the legal mechanism for the collection of contributions from developers toward the delivery of infrastructure works including roads, open space, drainage and community facilities.

Clean Up Australia DayClean up Australia Day activities were held on 25 and 28 February and 2 March at Lighthorse Park. Participating in the event were 41 local schools, 26 community groups and 3 businesses. An estimated ten tonnes of waste were collected.

Section 149 Planning CertificatesCouncil recieved 6,069 Section 149 Planning Certificates this year demonstrating a high interest in the Liverpool property market.

Traffic Impact AssessmentsCouncil undertook traffic impact assessments on more than 212 development applications to mitigate and address traffic impacts of new development.

Graffiti Redirection Programs A partnership with the Ted Noffs Foundation Street University was established to engage young people and the community in graffiti redirection programs. Activities and events organised as part of this program also include:

• The launch of a short film, ‘Get-Up’ which showcases alternatives to illegal graffiti and

• Artists commissioned to install works at Ashcroft Shops, McGirr Park, Cartwright Avenue Miller and Lurnea Plaza, Hill Road Lurnea.

The Year in Review

Page 52: Annual Report 2013-14

Liverpool City Council Annual Report 2013-14 52Liverpool City Council Annual Report 2013-14 52

The Year in Review (continued...)Companion Animal Management The statement on activities relating to enforcing and ensuring compliance with the Companion Animals Act and Regulation for this year includes:

• Council spent $554,669 on animal management and generated $190,830 for the services offered.

• Renbury farm, Council’s pound facility took care of 1,796 cats and 1,452 dogs.

• Fifty eight dog attacks were reported during the year via the companion animal register.

• More than 230 companion animals were micro-chipped and educational show bags provided to the community at a micro-chipping day on 21 September 2013 as part of Council’s obligation to deliver companion animal community education programs.

1,619 COMPANION ANIMALS WERE REGISTERED THIS YEAR

• Strategies in place to promote and assist the de-sexing of dogs and cats include subsidies promoted through Council’s website and local papers. Council provided 14 de-sexing subsidies for residents receiving a pension.

• Strategies which seek alternatives to reduce the rate of euthanasia were investigated in partnership with the authorised impounding facility. Last year 333 dogs and 722 cats were released to organisations for re-homing. Council has removed more than feral 110 cats with the assistance of residents.

• Council has two off-leash areas: Lieutenant Cantello Reserve at Stewart Drive, Hammondville and Hoxton Park Reserve at Wilson Drive, Hinchinbrook. Council continues to look at new locations to further increase the number of off-leash areas and also to improve the facilities provided at the existing locations.

Liverpool City Council Annual Report 2013-14 52

Page 53: Annual Report 2013-14

Liverpool City Council Annual Report 2013-14 53

Playground Upgrades $531,000 was spent on playground upgrades. Works included landscaping, installation of additional play equipment, seats, fitness equipment and replacing of existing play equipment with new wet pour rubber surfaces.

The following playgrounds were upgraded:

• Anzac Creek Park, Wattle Grove • Brallos Park, Holsworthy • Satleberg Park, Holsworthy • Wilkes Park, Moorebank • Glen Regent Reserve No. 1 and 2, Casula • Havard Park, Prestons • Ida Kennedy Reserve, Hinchinbrook

Improved Playground Access $69,000 was spent to improve access to the following playgrounds under the Disability Action Plan (DAP) program:

• Briggs Park , Cecil Hills • Gough Park, Cecil Hills • Dunumbral Park , Cecil Hills • Woodside Park, Hinchinbrook • Jacquie Osmond Reserve, Warwick Farm • Hammondville Park, Hammondville • Malyinya Park, Moorebank • Wilkes Park, Moorebank • Satleberg Park, Holsworthy

Park refurbishment and Enhancement works $1.4 million was spent on improving key suburb and local parks. This includes:

• New playgrounds, outdoor gym and pathways in MacLeod Park, Prestons

• A soccer field and netball court at Scott Memorial Park, Austral

• Landscaping works at Alamein Park, Liverpool; Meere Park, Lurnea and Beswick Park, Liverpool, a new access road at Ernie Smith Reserve, Moorebank and a new footpath network at Dalmeny Reserve, Prestons.

Page 54: Annual Report 2013-14

Liverpool City Council Annual Report 2013-14 54Liverpool City Council Annual Report 2013-14 54

PRIVATE WORKS AND FINANCIAL ASSISTANCE

Voluntary Planning Agreements (VPA)

VPA ASSOCIATED APPLICATION DETAILS DESCRIPTION OF WORKS STATUS

Hydrox Nominees Pty Ltd, Lot 1 DP 1173635, Airfield Drive, Len Waters Estate

Council to receive $550,000 to provide flood mitigation works for Georges River catchment.

VPA yet to be enacted

Georges Fair Estate Lot 2127 DP 11452258 Georges Fair

Provision of necessary roads and public open space for estate

Conditions of agreement have been complied with to date

Former Hoxton Park airport, Lot 22 DP 1042996, Cowpasture Road

Embellishment and dedication of Chinbrook Creek, construction of drainage detention basin, road bridge, bike and pedestrian path and signalised intersection at Cowpasture road.

Majority of infrastructure works were completed and de-registration of agreement is underway

Defence Housing Australia, Lot 7 Sirius Road, Voyager Point

Embellishment and dedication of land adjacent to Williams Creek

Land dedication and embellishments are under construction

Mirvac Homes (NSW) Pty Ltd and Landcom Lot 11 DP 1139171 Elizabeth Hills

Embellishment and dedication of Hinchinbrook Creek foreshore and drainage land, provision of public recreation facilities and public open space for the estate.

Construction works are underway

New Brighton Golf Course180 Nuwarra Road, Moorebank

Construct shared pedestrian and cycleways, dedicate Georges River foreshore and other land and rehabilitate existing vegetated areas

Works are yet to be undertaken

COMMUNITY SATISFACTION – LIVABLE SAFE CITY

Annual Telephone SurveySince 2011-12, there has been an increase in community satisfaction with development being compatible with the local area. Whereas community satisfaction for city centre appearance and parks & gardens decreased between 2011 and 2012, this increased in 2013

3.45

3.40

3.35

3.30

3.25

3.20

3.15

3.10

3.05

3.00Appearance of the city centre

City centre parks and gardens

Development is compatible with

local area

2011 2012 2013

3.22

3.39

3.26

3.14

3.32

3.29

3.18

3.36

3.30

Page 55: Annual Report 2013-14

Liverpool City Council Annual Report 2013-14 55Liverpool City Council Annual Report 2013-14 55

Annual Telephone Survey

CLOSED CIRCUIT TELEVISION (CCTV)

Council delivered a network of CCTV cameras in the Liverpool city centre to promote the community’s sense of safety in public and open spaces.

Highlights include:

CCTV installation and visual display systemCouncil installed CCTV at 20 locations. This enhanced surveillance network provides 24 hour recording of local streets, retail precincts and parks across central Liverpool and acts as a valuable deterrent against all types of anti-social behaviour. The CCTV footage is monitored by local police.

Signage and Community AwarenessCouncil undertook a broad promotional campaign to inform the community of the CCTV surveillance. This included newspaper articles, local advertising and promotion at Council’s New Year’s Eve and Australia Day events.

DEVELOPMENT APPLICATION REFORM PROJECT

This project aims to improve Council’s capacity to process a high volume of development applications in response to rapid urban growth and development across Liverpool. Highlights include:

Fast Track processCouncil developed a new best-practice development assessment process called Fast Track. Fast Track allows for the consistent assessment of low-risk development applications within five business days.

Council is also in the process of implementing a range of other best-practice business improvement initiatives to reduce development application backlogs and to promote better planning outcomes.

This includes:

• Developing a new internal risk management framework

• Standardising development assessment conditions • Transitioning to a paperless environment • Implementing new electronic tools

Online tracking Council launched the Liverpool ePlanning Portal in May 2014 to enable stakeholders to view and track the lodgement of development applications online and search property details.

The ePlanning portal will provide a platform for future online tools such as mapping and electronic lodgement.

Trainee planner program Council’s trainee planner program employs recent planning graduates and current students for a period of 12 months to gain experience in both statutory and strategic planning. This program has proved to be a successful investment in staff development, with a number of trainees moving on to permanent roles at Council.

Page 56: Annual Report 2013-14

Direction 03.

Healthy Inclusive City

This direction is about creating a harmonious community which values and respects diversity and embraces the opportunities it provides. Equity and inclusion will underpin all of Council’s service delivery as it strives to build community strength and ensure social inclusion.

56

Page 57: Annual Report 2013-14

Direction 03. Healthy Inclusive City

PROGRESS AGAINST PRINCIPAL ACTIVITIES

Children’s Services All 6 actions were on track/completed

Community Facilities5 actions were on track/completed 3 actions are in progress/carried over to next year

Customer ServicesAll 5 actions were on track/completed

Libraries and MuseumAll 8 actions were on track/completed

Social OutcomesAll 14 actions were on track/completed

1 year Actions

10-YEAR STRATEGIESFoster social inclusion strengthens the local community and increase opportunities for people who may be experiencing barriers.

Celebrate and respect Liverpool’s rich cultural and social diversity and embrace the opportunities it provides.

Improve health and wellbeing and encourage a happy, active community.

Plan, support and deliver high quality and accessible services, programs and facilities.

Liverpool City Council Annual Report 2013-14 57

8% delayed

92% on

track

10-YEAR COMMUNITY GOALSThese are the goals for the city of Liverpool. Everyone has a role in achieving these goals, whether they are a government department, business or resident in Liverpool.

90% OF PEOPLE EXPRESS SATISFACTION OR BETTER WITH THEIR CONTACT WITH COUNCIL. 79% of people in December 2013 (Source: Annual Telephone Survey)

AN INCREASE IN THE NUMBER OF PEOPLE WHO PARTICIPATE IN REGULAR PHYSICAL ACTIVITY. 48.1% increase from 47.2% in 2010 (Source: South Western Sydney Local Health District, 2013, Liverpool Local Government Area Health Profile 2013)

85% OF PEOPLE BELIEVE THAT THERE IS A SENSE OF COMMUNITY IN LIVERPOOL.51% of people in 2013 (Source: Annual Telephone Survey)

90% OF PEOPLE FEEL THAT LIVERPOOL IS A HARMONIOUS SOCIETY WHICH RESPECTS CULTURAL DIVERSITY. 52% of people as at December 2013 (Source: Annual Telephone Survey)

STRATEGIC PROJECTS PROJECT NAME STATUS Live well in Liverpool Completed

Customer Service In progress and Standards carried over to 2014-15

Carnes Hill Recreation In progress and and Community Precinct carried over to 2014-15

Page 58: Annual Report 2013-14

Liverpool City Council Annual Report 2013-14 58Liverpool City Council Annual Report 2013-14 58

The Year in Review

Children’s Services won Leadership Excellence AwardsChildren’s Services won the Local Government Management Excellence Awards in the ‘Leadership Excellence in Community Services’ category.

Youth Week More than 400 young people participated in Youth Week activities during April 2014. This included Street Legacy IV, a dance and singing competition and the Dear Liverpool social media initiative.

Community grants distributed Council worked with local clubs and organisations to grant $668,454 in funding to 33 community organisations through the ClubGRANTS Scheme. Successful organisations included Rosemount Good Shepherd Youth and Family Services, Catholic Education Foundation, St Vincent’s Clinic, Sisters of Charity Outreach, Ted Noffs Foundation and the Salvation Army.

Community grants receivedCouncil received approximately $280,000 in funding for a range of community programs which support disadvantaged communities in Liverpool including:

• The Community Building Partnership Program for upgrades to the Wattle Grove Youth Centre ($20,000) and Miller Community Centre ($54,400)

• Liverpool Catholic Club grant for community markets ($2,500)

• Department of Family and Community Services grant for the 2168 Training and Research Centre ($8,922), community development funding and networks ($17,851) and community farm project ($97,182)

• Office of Communities funding for a Men’s Shed ($45,000) and community development (youth - $3,075)

• An Attorney General’s Department grant through Proceeds of Crime Act for Graffiti Prevention and Reduction ($35,000)

Page 59: Annual Report 2013-14

Liverpool City Council Annual Report 2013-14 59

Language Aide Program The language aide program was used on 238 occasions to provide informal translation services to people from non-English speaking backgrounds. The top three languages were Arabic, Croatian and Italian.

Liverpool Midnight BasketballThere were 99 young people and 40 volunteers in the Liverpool Midnight Basketball program held between 14 February and 4 April.

Liverpool Library and Museum Participation in school holiday activities at Liverpool’s libraries included:

• 814 children and young adults enrolled in the library’s Summer Reading Club

• 350 people for the Featherdale Wildlife Park animal visit

• 141 children participated in the special story-time event ‘Wild Homes – Rangers on the Run’.

Participation in activities at Liverpool Regional Museum included:

• 16 attendees at a book and DVD selection meeting for the Vietnamese community

• 20 attendees at a talk on the Trainspotting (Powerhouse Museum International Photo competition) exhibition.

Other exhibitions and events at the City Library and museum included Behind the Song, Max Dupain on Assignment and Escape from Vietnam, World Class Teapots from Bygone Beauties Teapot Museum, Children’s Book Week, Adult Learners’ Week and History Week.

Volunteer Recognition Dinner More than 200 people attended the Gift of Time volunteer recognition dinner on 21 May at Liverpool Catholic Club. The event recognises the invaluable contribution that volunteers in Liverpool make throughout the year.

Page 60: Annual Report 2013-14

Liverpool City Council Annual Report 2013-14 60Liverpool City Council Annual Report 2013-14 60

City Library Renewal The complete renewal of an air-conditioning plant at the City Library was completed this year. The works were funded by the Loan Infrastructure Renewal Scheme and valued at $1.5m.

Miller Community Centre Improvements Improvements valued at $54,000 were made to the Miller Community Centre (former Miller Library), in order to establish an employment and education hub in Miller. The facility is leased to the Community 2168 project.

Community Facility Improvement and Upgrades Council spent $5.7 million renewing, refurbishing and improving many of its existing community facilities including:

• An internal upgrade to Orange Grove Community Centre

• Upgrades to the Speed Street Community Centre • Building upgrades to the Brass Pipe and Band Hall, Michael Wenden gymnasium and three of Council’s child care centres

• Potable water and electrical supply to Kokoda Oval • Air-conditioning renewal to Cecil Hill • Improvements to the 50 metre pool at Wenden Swim Centre.

BEFORE AFTER

The Year in Review (continued...)

Page 61: Annual Report 2013-14

Liverpool City Council Annual Report 2013-14 61

COMMUNITY SATISFACTION – COMMUNITY FACILITIES

Annual Telephone Survey SATISFACTION FOR PROVISION OF COUNCIL'S

LIBRARY SERVICES & PLAYGROUNDS CONTINUES TO GROW.

2011 2012 2013

4.50

4.00 3.50

3.00

2.50

2.00

1.50

1.00

0.50

0.0Libraries Playgrounds

Liverpool City Council Annual Report 2013-14 61

Qtr Avg 2012 Sep Qtr Dec Qtr Mar Qtr Jun Qtr

CALLS (INCLUDING AFTER HOURS)

42,624 47,568 47,957 47,249 43,953

REQUESTS 15,407 18,572 19,080 19,814 17,259

CUSTOMER SERVICE CENTRE

12,385 17,496 16,925 16,222 14,167

CHILDCARE CENTRE

Utilisation Rates

CUSTOMER SERVICES

Target 86.12012/13

Sept Qtr

Dec Qtr

Mar Qtr

Jun Qtr

77

85

85

90

94

50,000

40,000

30,000

20,000

10,000

Page 62: Annual Report 2013-14

Liverpool City Council Annual Report 2013-14 62Liverpool City Council Annual Report 2013-14 62

COMMUNITY SATISFACTION – SUPPORT SERVICES

COMMUNITY SATISFACTION WITH PROVISION OF SUPPORT SERVICES DROPPED SIGNIFICANTLY BETWEEN 2011 & 2012;

HOWEVER THIS IMPROVED IN 2013 WITH SATISFACTION RATES INCREASING.

Annual Telephone Survey

2011 2012 2013

3.80

3.70 3.60

3.50

3.40

3.30

3.20

3.10

3.00

2.90Aged persons Young people Multicultural

communities

CUSTOMER SERVICE STANDARDSThis project is aimed at developing new customer service standards for the whole of Council to support the provision of exceptional, courteous and timely responses to the community and customers of Council.

Policy ReviewCouncil reviewed its Customer Service and Communications Policy in May 2014. This review will form the basis for the new customer service standards.

Customer Service Week A range of activities were held during Customer Service week in December 2014 to improve customer service levels across all of Council. Activities included buddying sessions with Customer Services staff to give other staff and management an insight into Council’s operations and customer service delivery and morning teas aimed at introducing different departments to each other.

Staff Training A comprehensive training program was delivered to improve how Council staff communicate with customers. More than two hundred employees were trained through the year. The training focused on behaviour and social styles for different personality types.

Page 63: Annual Report 2013-14

Liverpool City Council Annual Report 2013-14 63

CARNES HILL RECREATION AND COMMUNITY PRECINCTThis project will deliver a new recreation and community precinct in Carnes Hill that provides services, facilities and spaces to support the health and local wellbeing of the community, including a community centre, district library, leisure centre, key suburb park, skate park and associated services.

The proposed precinct will cater for residents living in Carnes Hill, Hoxton Park, West Hoxton, Prestons, Middleton Grange, Edmondson Park and the broader Liverpool catchment.

Consultations and proposed design More than 250 community members responded to the proposed design of the Precinct through various community engagement platforms. Community responses detailed overwhelming support for the project including key issues and areas for improvement in the proposed design.

Development Approval and detailed designs The Development Application was submitted to the Sydney West Joint Regional Planning Panel (JRPP) for independent assessment. The Plans were approved by the Panel and detailed designs for the Precinct have been completed.

LIVE WELL IN LIVERPOOLThis project delivered community-based physical activity and healthy living programs and policies that support healthy lifestyles, reduce obesity and enhance positive health behaviours in the daily lives of people in Liverpool. The program was funded by the NSW Department of Health and Ageing, Heart Foundation, South Western Sydney Local Health District and Fairfield City Council.

There were 285 people from disadvantaged groups participated in walking groups, cycling training sessions, healthy cooking program and outdoor gym sessions.

Installation of outdoor gymAn outdoor gym was installed at Hart Park, Warwick Farm. The equipment is aimed at encouraging local residents to work-out and be active outdoors.

Healthy Living Program Live Well in Liverpool delivered a range of free activities and programs including walking and cycling groups, healthy cooking classes and a Certificate II in Hospitality through the Liverpool Community Kitchen and Hub. A Healthy Living in Liverpool Cookbook modified traditional cultural recipes suggested by program participants into healthy eating options.

Development of an active travel map The Liverpool and Fairfield Active Travel Map was developed to promote physical activity. 10,000 copies of this map were printed for each Local Government Area. The map was translated into 20 languages and has been distributed widely through community organisations and Council facilities and events.

Liverpool City Council Annual Report 2013-14 63

Page 64: Annual Report 2013-14

64

This direction is about community engagement, pride and identity. As a regional city, Liverpool is home to several icon-ic facilities such as the Casula Powerhouse Arts Centre and Brownes Farm Reserve.

Direction 04.

Proud Engaged City

Page 65: Annual Report 2013-14

Direction 04. Proud Engaged City

PROGRESS AGAINST PRINCIPAL ACTIVITIES

Casula Powerhouse Arts Centre (CPAC)5 actions were on track/completed

1 action is in progress/carried over to next year

Community EngagementAll 11 actions were on track/completed

Events6 actions were on track/completed 1 action is in progress/carried over to next year

1 year Actions

10-YEAR STRATEGIESStrengthen and celebrate Liverpool’s unique identity.

Engage and consult with the community to enhance opportunities for communication and involvement.

Deliver a range of stimulating and vibrant cultural events, programs and festivals.

Provide first class and iconic facilities and places.

Protect and preserve Liverpool’s heritage, including its rural landscape and cultural history.

Liverpool City Council Annual Report 2013-14 65

10-YEAR COMMUNITY GOALSThese are the goals for the city of Liverpool. Everyone has a role in achieving these goals, whether they are a government department, business or resident in Liverpool.

85% OF PEOPLE EXPRESS SATISFACTION OR BETTER WITH COUNCIL’S CONSULTATION WITH THE COMMUNITY. 76% satisfaction or better in December 2013 (Source: Annual Telephone Survey)

AN INCREASE IN PEOPLE'S SENSE OF BELONGING IN THEIR CITY. 51% of people as at December 2013 (Source: Annual Telephone Survey)

AN INCREASE IN THE NUMBER OF PEOPLE WHO PARTICIPATE IN ARTS & CULTURAL ACTIVITIES.Visitation to Casual Powerhouse Arts Centre increased by 15% in comparison to 2011-12STRATEGIC PROJECTS

PROJECT NAME STATUS Communications Strategy Project is still under-way and has been carried over to 2014-15

12% delayed

88% on

track

Page 66: Annual Report 2013-14

Liverpool City Council Annual Report 2013-14 66

The Year in Review

Best Art Gallery Award CPAC won Best Art Gallery in ‘Best of Sydney’ Awards 2013.

Participation at Programs and Events PROGRAM VALUEWorkshops (Access/School Holidays/Adult/Seniors)

4,119

Legal Art Walls 481

Life Drawing 88

Clayhouse 966

Storytime 3,057

Citizenship CeremonyLiverpool welcomed 1,222 new citizens at 13 ceremonies. The top 5 countries of origin were Iraq, India, Fiji, Vietnam and Philippines. A special citizenship ceremony was also held with a new 100 year old citizen. The event attracted significant media attention.

Casula Powerhouse Arts Centre (CPAC) A range of events were held at CPAC this year, including:

• The launch of the funding campaign for the Way out West Festival for Children with the major project ‘Tanabata Wish Upon a Star’ receiving $4,500.

• A Smash and Grab on 7 June, which included the performance and creation of the commissioned artwork, Hollow Promise – Casula by artist, Gary Deirmendjian. The day attracted 170 visitors.

• The opening doors exhibition launched on 24 May. Thirty art works were exhibited by students and 13 artworks by mid-career artists. The exhibition celebrates the involvement of the community to combat graffiti and vandalism. The program was funded by the Australian Government under the Proceeds of Crime Act 2002.

• Three performances including ‘The Good, The Bad and the Ethnic’ which had a 61% attendance rate and generated $5,000 in profit.

• A senior’s matinée performance of ‘Musical of the Night’, which had 100% attendance and sold 100 lunches on the day.

• Touring its first in-house production of Tough Beauty to MonkeyBaa theatre in Darling Quarter, more than 400 children and industry professionals attended.

• A range of exhibitions including; Enraptured – the Art of Costuming, Tony Mott rock exhibition, NEXT 2013 HSC art students exhibition and The Christo: John Kaldor Family Collection.

• Hosting the Governor General’s International Women’s Day function in March 2014.

• Navigation Pacifica 2013 on Saturday 19 October. More than 4,000 people attended a range of activities, events and performances. This includes BBQ Pacifica which is a part of the Sydney Morning Herald’s, Crave International Food Festival.

Page 67: Annual Report 2013-14

Liverpool City Council Annual Report 2013-14 67

CPAC – Grants Casula Powerhouse Art Centre (CPAC) applied for multiple grants during the year including $200,000 over 2 years from the Crown Resort Foundation for a Western Sydney tour of CPAC’s flagship children’s festival, ‘Way out West’. CPAC also secured:

• ArtsNSW funding of $21,500 for the local tour of Elders of Liverpool – A photo exhibition by Merv Bishop, a leading Aboriginal artist.

• Funding of $62,000 from a range of sources including the Australia Council for the Arts and Arts, and NSW Young People.

• NSW Sports and recreation funding of $10,000 and NSW Department of Trade and an investment grant of $5,000 for Casula Powerhouse Education Program.

Community Forums Council organised 20 community forums this year. Topics discussed include Council’s budget, policing update and information sessions on Council initiatives.

Online Community Engagement Portal Liverpool Listens, Council’s new online community engagement portal was launched in May 2014. The website received 1,206 visits between May and June. Community members were engaged on projects such as Liverpool night markets, the Building Our New City project and a multicultural advisory forum through the portal.

NAIDOC Week and Sorry DayCouncil organised a number of initiatives to promote and celebrate Aboriginal culture within Liverpool. There were 250 participants in the NAIDOC day march from Macquarie Mall to Bigge Park followed by a family fun day on 10 July 2013. More than 65 people participated in Sorry Day activities including Smoking Ceremony and flag raising on 7 June 2014.

Australia Day Festival An Australia Day event was held on 26 January 2014 at Woodward Park Liverpool with more than 30,000 people attending. There were 21 food stallholders, 19 general market stalls, 7 amusement rides and approximately 250 performers including Third Degree (X Factor finalist 2012) and Johnny Ruffo (Home and Away, X Factor and Dancing with the Stars).

Page 68: Annual Report 2013-14

Harmony Day More than 850 people celebrated Harmony Day at Bigge Park on 21 March 2014. Activities included a soccer clinic with the Western Sydney Wanderers, community art and citizenship ceremony.

New Year’s Eve New Year’s Eve celebrations were held at Chipping Norton Lakes in December. There were 9,000 attendees for the New Year’s Eve event. Entertainers included The Kingz Party band, Smurf Show, Ashton Circus Show, Imprint dance crew and Tee (X Factor top 13).

Starry Sari nightStarry Sari Night, a Bollywood themed film night was held on 31 August 2013 with more than 3,000 people attending. Starry Sari Night aims to celebrate Liverpool City’s rich cultural diversity and contributes to make Liverpool’s City Centre more active and vibrant, particularly during evenings and on weekends.

‘Liverpool Life’‘Liverpool Life’, Council’s new-look newsletter was launched and distributed to 14,464 households in rural areas and 58,370 households in urban areas on a bi-monthly basis this year. The new-look of the newsletter provides frequent updates to the community in a more vibrant and easy to read format. The key stories are translated into the top three language groups.

Liverpool City Council Annual Report 2013-14 68Liverpool City Council Annual Report 2013-14 68

The Year in Review (continued...)

Page 69: Annual Report 2013-14

COMMUNITY SATISFACTION - VIBRANT PROSPEROUS CITY Annual telephone survey

COMMUNITY SATISFACTION FOR CONSULTATION WITH THE

COMMUNITY AND FESTIVALS AND MAJOR EVENTS DEMONSTRATES A NOTABLE INCREASE AND COULD BE ATTRIBUTED TO COUNCIL’S INTRODUCTION FOR EVENTS SUCH AS NYE AT CHIPPING NORTON LAKES AND STARRY SARI NIGHT.

COMMUNITY SATISFACTION WITH

Casula Powerhouse Arts Centre

66,000

64,000

62,000

60,000

58,000

56,000

54,000

52,0002011-1255,619

2012-1365,668

2013-1465,793Visitations

Liverpool City Council Annual Report 2013-14 6969

4.50

4.00

3.50

3.00

2.50

2.00

2011

Support for arts and cultural groups

Casula Powerhouse Arts Centre

Information on the website

Consultation with the community

Festivals and major events

2012 2013

WHILST SUPPORT FOR ARTS AND CULTURAL GROUPS EXPERIENCED A DROP BETWEEN 2011 & 2012 AND IS GRADUALLY INCREASING.

CASULA POWERHOUSE ARTS CENTRE REMAINS HIGH

Page 70: Annual Report 2013-14

70

This direction is about protecting the environment and ensuring development is sustainable and ecological.

Natural Sustainable City

Direction 05.

Page 71: Annual Report 2013-14

Liverpool City Council Annual Report 2013-14 71

10-YEAR COMMUNITY GOALSThese are the goals for the city of Liverpool. Everyone has a role in achieving these goals, whether they are a government department, business or resident in Liverpool.

AT LEAST 80% OF DOMESTIC WASTE IS DIVERTED FROM LANDFILL. 69.4% of corporate and community total annual waste diverted from landfill 2013-14. (Source: Fortnightly Waste Tonnage Report)

IMPROVED CONDITION OF RIVERS AND WATERWAYS TO B+ OR BETTER. Only 2 out of 6 rivers/waterways in Liverpool have this rating. (Source: 2012-2013 River Health- Georges and Cooks River Alliance)

A YEARLY HOUSEHOLD WATER CONSUMPTION RATE COMPARABLE TO

GREATER SYDNEY.Sydney wide 22kl per house and 159kl per unit. Liverpool is 236.4kl per house and 190kl per unit. (Source: www.myplanetfootprint.com.au)

INCREASED NATURAL BUSH LAND CORRIDORS THAT ARE RESTORED.This data is not yet available

Direction 05. Natural Sustainable City

PROGRESS AGAINST PRINCIPAL ACTIVITIES

Environmental SustainabilityAll 10 actions were on track/completed

Stormwater Management4 actions were on track/completed

1 action is in progress/carried over to next year

Waste ManagementAll 6 actions were on track/completed

1 year Actions

10-YEAR STRATEGIESLead the community to develop and implement sustainable practices.

Enhance and protect natural corridors, waterways and bushland.

Reduce adverse environmental impacts for present and future generations.

STRATEGIC PROJECTS PROJECT NAME STATUS Community Recycling Completed Centre Community Nursery Project is still Education Centre under-way and has been carried over to 2014-15

5% delayed

95% on

track

Page 72: Annual Report 2013-14

Direction 05. Natural Sustainable City

Liverpool City Council Annual Report 2013-14 72Liverpool City Council Annual Report 2013-14 72

Community Participation and Volunteering A total of 547 people and community volunteers participated in activities, programs and events including the Environment Volunteer Program, Community Tree Planting program, National Tree Day event and the Sustainability Blitz Workshop Series. A Volunteer Recognition event was held on 4 December 2013 to thank these volunteers.

Sustainability Blitz WorkshopThere were 8 Sustainability Blitz Workshops held this year including Natural Green Cleaning, Composting and Worm Farming, No Dig Gardening, Plant Propagation, Chook Care and an Organic Garden Problem Solver workshop.

Sustaining Liverpool NewsletterThe Winter, Spring, Summer and Autumn edition of the Sustaining Liverpool Newsletter was distributed to more than 1,500 households.

Tree Planting There were eight community tree planting activities held this year including National Tree Day on 28 July. The Council also supported 35 Schools to participate in Schools National Tree Day by providing 1,800 plants. There were 126 volunteers and 1,920 plants were planted.

Reducing hazardous and household waste Two chemical clean out events were held on 18 October 2013 and 22 February 2014. More than 652 cars attended the event and 28 tonnes of hazardous waste were collected and disposed of in an environmentally safe manner.

A Garage sale trail was held on 26 October 2013 to support families in Liverpool to re-cycle unwanted household products.

Flood Prevention Council continues to provide the necessary infrastructure to protect our community from flooding.

Restoration of 400 metres of heavily damaged pipes to improve hydraulic capacity and extend the service life of Council’s piped drainage systems in Lurnea was completed. A total of 1.3 kilometres of pipe has been rehabilitated covering a pipe network of 10 kilometres during 2013-14. Metres of drainage pipes rehabilitated during this period.

The Year in Review

Page 73: Annual Report 2013-14

Liverpool City Council Annual Report 2013-14 73Liverpool City Council Annual Report 2013-14 73

Bushland restored and maintained The cumulative area of bushland restored and maintained by Council’s Environment Levy program in 2013-14 is 872,791m2 since the commencement of the program. Of this, approximately 179 hectares of new bushland areas were restored in 2013-14, including:

• Blamfield Oval, Ashcroft • Brickmakers Creek, Warwick Farm • Cabrogal Park, Hinchinbrook • Dwyer Oval, Warwick Farm • Ernie Smith Reserve, Moorebank • Fassifern Park, Cartwright • Glen Regent Reserve, Casula

Water and Energy Conservation Council undertook a range of water and energy conservation initiatives this year including:

• Window tinting and LED lighting replacement to level 2 of the Liverpool City Library

• Installation of energy efficient equipment including solar panels at Wattle Grove and Hinchinbrook Early Education and Care Centres.

• Installation of waterless urinals at Liverpool City Library to reduce water usage and deliver cost savings.

BEFO

RE

AFT

ER

Page 74: Annual Report 2013-14

STORMWATER MANAGEMENT SERVICE CHARGE

The Stormwater Management Services Charge commenced in July 2008 and generates approximately $1.2 million in funding each year to undertake additional stormwater rehabilitation and renewal works to accommodation for Liverpool’s growing population.

The following table provides a summary of works completed for the year ending 30 June 2014.

PROJECTS PARTLY OR FULLY FUNDED THROUGH STORMWATER MANAGEMENT SERVICE CHARGE

FUNDING FROM STORMWATER CHARGE ($)

TOTAL EXPENDITURE ($)

STATUS AS AT 30 JUNE 2014

Flood Mitigation $33,068 $33,068

New Flood Markers at Chipping Norton, Austral and Prestons.

$7,037 $7,037 Completed

Flood Mitigation - Overland Flows $15,400 $15,400 Completed

CBD Trunk Drainage - Elizabeth St, George St to College Street.

$10,631 $10,631 Completed

Stormwater Quality $110,979 $110,979

Miller - New Gross Pollution Trap $78,995 $78,995 Completed

Hinchinbrook – New Gross Pollution Trap $31,984 $31,984 Completed

Drainage Enhanced Maintenance $266,624 $226,941

Programmed Drainage Maintenance $153,312 $117,839 Completed

Stormwater Pipe Inspection, Assessment and Ancillary Works

$113,312 $109,102 Completed

Erosion Protection Works $164,514 $164,514

Bonds Creek, Tenth Avenue Austral - Bank Stabilisation

$61,962 $61,962 Completed

Wattle Grove Wetland, Wattle Grove – Bank Stabilisation

$63,050 $63,050 Completed

Georges River, Pleasure Point – Erosion Protection $39,502 $39,502 Completed

Stormwater Pipe Restoration and Renewal $587,546 $587,546

Stormwater Pipe Relining $379,560 $379,560 Completed

Stormwater Pipe Structural Patches $207,986 $207,986 Completed

Grand Total $1,162,731 $1,123,048

Liverpool City Council Annual Report 2013-14 74

Page 75: Annual Report 2013-14

Liverpool City Council Annual Report 2013-14 75

900

850

800

750

700

650

Yr End 2012/13

Sep Qtr Dec Qtr Mar Qtr Jun Qtr

000'

s SQ

M

757,174 759,974

828,514

857,841

872,791

COUNCIL’S TOTAL ENERGY CONSUMPTION DECREASED BY APPROXIMATELY 3% DURING 2013-14 WHEN COMPARED TO 2012-13

32.5

32.0

31.5

31.0

$1,600,000

$1,580,000

$1,560,000

$1,540,000

$1,520,000

$1,500,000

$1,480,000

$1,460,0002012 - 2013 2013 - 2014

000'

s G

J

31,627

32,364

NATIVE PLANT ECOSYSTEMS

COUNCIL'S TOTAL ENERGY CONSUMPTION (EXCLUDING STREET LIGHTING)

Page 76: Annual Report 2013-14

Liverpool City Council Annual Report 2013-14 76

COMMUNITY RECYCLING CENTRE Council opened the Liverpool Community Recycling Centre at its operations centre in Rose Street, Liverpool. To deliver the project, Council secured a $250,000 grant from the NSW Environmental Protection Authority (EPA).

Recycling CapabilityThe Centre allows residents to drop off their household waste, in-turn reducing up to 85% of the problem wastes that are traditionally disposed of at Chemical Clean-Out events.

More than 25 tonnes of problem waste was diverted from landfill within 6 weeks of operation, 20 tonnes being computers and television. There were 412 participants in the first 6 weeks since the Centre was opened.

The Liverpool Community Recycling Centre will be used as a 'model' by the EPA to showcase the benefits of such facilities to other Councils and organisations.

Liverpool City Council Annual Report 2013-14 76

4.5

4

3.5

3

2.5

2

1.5

1

0.5

0Health of rivers

and creeksDomestic Waste

Services

2011 2012 2013

COMMUNITY SATISFACTION WITH

HEALTH OF RIVERS AND CREEKS HAS REMAINED RELATIVELY STABLE IN THE PAST THREE YEARS. EVEN THOUGH IT HAS DROPPED SLIGHTLY, THE SATISFACTION RATE FOR DOMESTIC WASTE SERVICES IS STILL HIGH AND HIGHER THAN THE BENCHMARK FOR NSW COUNCILS.

Annual telephone survey

COMMUNITY SATISFACTION – NATURAL SUSTAINABLE CITY

Page 77: Annual Report 2013-14

Liverpool City Council Annual Report 2013-14 77

ENVIRONMENT LEVY WORKSOn 3 July 2007, Council received approval for a permanent environment levy from the then Department of Local Government. The environment levy is an ad valorem charge per rateable property and is approximately $20 per property per annum. The funds allow Council to undertake projects, programs and initiatives which address environmental sustainability in Liverpool.

Council’s Environment Restoration Plan provides the framework for delivery of key projects which are funded through the environment levy.The following table provides details of all projects funded through the levy in 2013-14.

INCOME AND EXPENDITURE FOR THE ENVIRONMENT LEVY

AMOUNT DETAILS

TOTAL INCOME $1,541,756

Environment Levy $1,436,116

Interest Environment Levy $105,640

Summary of Expenditure $1,151,360

ADMINISTRATION AND EDUCATION COSTS

Administration Costs (includes Salaries)

$366,390

• Salaries of Environment Restoration Coordinator, two project officers, volunteer supervisor and site inspector

• Consultant costs

Community Support $9,595

• Provision of support for Environment Advisory Committee and environment group meetings and activities

• Provision of training for Environment Volunteers

George’s River Riverkeeper Program $40,717Contribution to delivery of George’s River Riverkeeper Program which undertakes creek cleaning projects at various locations around Liverpool

Educational Material and Programs $22,524

Development and delivery of educational material and programs including:

• Major environment restoration projects

• Sustainability Blitz workshop series

• Quarterly environment activity flyers

• Development and distribution of Council’s quarterly environment newsletter Sustaining Liverpool

• Tree planting activities and environment events

TOTAL SPEND ON ADMINISTRATION AND EDUCATION

$439,226

Page 78: Annual Report 2013-14

Liverpool City Council Annual Report 2013-14 78

INCOME AND EXPENDITURE FOR THE ENVIRONMENT LEVY

AMOUNT DETAILS

MAINTENANCE, MATERIALS AND EQUIPMENT

Plants $16,365

Locally native plants for tree planting activities, tree giveaways, environment group activities, schools programs, grant projects, bush regeneration maintenance activities and Sustainability Blitz workshops

Mulch and site preparation $23,600Site preparation and provision of mulch for programs and activities

Site Maintenance $10,404Site maintenance works on completed major bush regeneration project sites

Bush Regeneration Maintenance $243,2954 full-time staff to undertake maintenance of bush regeneration sites

Equipment and Tools $4,184

Delivery of annual tree planting calendar, environment group activities, environment events including National Tree Day, bush regeneration maintenance and Sustainability Blitz workshops

TOTAL SPENT ON MAINTENANCE, MATERIALS AND EQUIPMENT

$297,848

ON-GROUND CONTRACTED WORKSBushland and riparian restoration works for the environment restoration project which includes weeding, locally native tree planting and litter removal

Bushland and riparian restoration works for the environment restoration project which includes weeding, locally native tree planting and litter removal

$28,715Maxwells Creek Riparian Restoration Project – Area 3 (Commenced March 2014, primary works in progress)

$14,549Haigh Park Riparian Restoration Project – Area 1 (Commenced March 2014, primary works in progress)

$30,560Ernie Smith Reserve Riparian Restoration Project – Area 4 (Commenced March 2014, primary works in progress)

$18,883Lot 10 Heathcote Road Riparian Restoration Project – Area 1 (Commenced December 2013, Capital works completed)

$2,640The River Walk Riparian Restoration Project – Area 2 (Commenced November 2013, primary works in progress)

$5,940Tepper Park Riparian Restoration Project – Area 1 (Commenced October 2013, primary works in progress)

$1,632Murragan Park Bushland Restoration Project – Area 3 (Commenced April 2014, primary works in progress)

$3,780Rossini Drive Riparian Restoration Project – Area 2 (Commenced February 2013, Primary works in progress)

ENVIRONMNET LEVY WORKS (CONTINUED...)

Page 79: Annual Report 2013-14

Liverpool City Council Annual Report 2013-14 79

INCOME AND EXPENDITURE FOR THE ENVIRONMENT LEVY

AMOUNT DETAILS

Bushland and riparian restoration works for the environment restoration project which includes weeding, locally native tree planting and litter removal

$26,257Nelson Phillis Park Bushland Restoration Project – Area 1 (Commenced August 2013, Capital works completed)

$24,456Lehmanns Oval Riparian Restoration Project – Area 1 (Commenced August 2013, Capital works completed)

$32,633Miller Park Riparian Restoration Project – Area 2 (Commenced June 2013, Capital works completed)

$62,933Hoxton Park Riparian Restoration Project – Area 3 (Commenced December 2013, Capital works completed)

$25,114Cabrogal Park Riparian Restoration Project – Area 2 (Commenced February 2013, Capital works completed)

$38,787Mannix Park Bushland Restoration Project – Area 2 (Commenced May 2013, Primary works in progress)

$31,262Blamfield Oval Riparian Restoration Project – Area 1 (Commenced November 2012, Capital works completed)

$21,477Powell Park Riparian Restoration Project – Area 1 (August 2012 – Project Completed)

$10,394Fassifern Park Riparian Restoration Project – Area 2 (August 2012 – Project Completed)

$5,037Dwyer Oval Riparian Restoration Project – Area 1 (August 2012 – Project completed)

$11,731Brickmakers Creek – Lawrence Hargrave Drive – Riparian Restoration Project – Area 1 (August 2012 – Project Completed)

$6,525Maxwells Creek Riparian Restoration Project – Area 2 (August 2012 – Project Completed)

$10,981Glen Regent Reserve Bushland Restoration Project – Area 1 (September 2012 – Project Completed)

TOTAL SPENT ON ON-GROUND CONTRACTED WORKS

$414,286

TOTAL EXPENDITURE $1,151,360

The balance of the funds not expended in 2013-14 will be transferred to the Environment Levy Reserve which will contribute to the future delivery of the Community Nursery and Environmental Education Centre.

Page 80: Annual Report 2013-14

80

This direction is about local and global connections. Council will work collaboratively with all relevant partners to improve the connectivity and functionality of Liverpool’s transport systems.

Direction 06.

Accessible Connected City

Page 81: Annual Report 2013-14

Liverpool City Council Annual Report 2013-14 81

Direction 06. Accessible Connected City

PROGRESS AGAINST PRINCIPAL ACTIVITIES Roads, footpaths and cycleways 6 actions were on track/completed

1 action is in progress/carried over to next year

Road SafetyAll 6 actions were on track/completed

Traffic and TransportAll 8 actions were on track/completed

1 year Actions

10-YEAR STRATEGIESProvide safe and easy travel with a high quality road and traffic management network.

Encourage sustainable and alternative transport options such as walking, cycling and public transport.

Collaborate with key stakeholders to maximise community access to emerging technologies.

Liverpool City Council Annual Report 2013-14 81

10-YEAR COMMUNITY GOALSThese are the goals for the city of Liverpool. Everyone has a role in achieving these goals, whether they are a government department, business or resident in Liverpool.

25% OF TRIPS TO WORK ARE MADE BY MODES OTHER THAN PRIVATE CAR 15.8% in 2011. This is a slight increase from 2006 (15.3%). (Source: Census Data)

95% OF HOMES HAVE ACCESS TO BROADBAND 66% of homes, a significant increase since 2006 (38.1%) (Source: Census Data)

85% OF PEOPLE EXPRESS SATISFACTION IN THE MANAGEMENT OF TRAFFIC OR SAFETY ON LOCAL STREETS80% of people in 2012.(Source: Annual Telephone Survey)STRATEGIC PROJECTS

PROJECT NAME STATUS Construction of Project is still Kurrajong and Bernera under-way and has Roads been carried over to 2014-15

Wi-Fi in the City Centre Project is still under-way and has been carried over to 2014-15

5% delayed

95% on

track

Page 82: Annual Report 2013-14

Direction 06. Accessible Connected City

Liverpool City Council Annual Report 2013-14 82

New and upgraded traffic facilities To improve pedestrian and traffic safety, new and upgraded traffic facilities were provided during the year at the following locations:

• Roundabout improvement at Barcelona Drive and Beech Road, Prestons

• A new roundabout at Kingsford Smith and Flynn Ave, Middleton Grange

• A new roundabout at Banks Road and Cartwright Ave, Miller

Resealing WorksResealing works were undertaken at Watts Rd, Western Rd (Cross St to Elizabeth Dr),Twelfth Ave, Wolstenholme Ave (Orient Rd to 450m North), King St (Devonshire Rd to Dead End) and Adams Road(Anton Road to Elizabeth Dr).

Footpath Upgrades

More than $8 million was spent in road pavement renewal and rehabilitation were completed covering 18 streets with a combined length of 9.3 kilometres. Works undertaken include:

• Footpath upgrades to improve accessibility and meet disability standards at Newbridge Rd, Chipping Norton (two), Insignia St, Sadleir and Scott St, Liverpool.

• New footpaths were completed on sections of Longstaff Avenue, Chipping Norton, Gemas.

Graduate Licence Scheme workshopFour Graduate Licence Scheme ‘Helping Learner Drivers become Safer Drivers’ workshops were held this year. There were 60 participants in these workshops.

More than $18.6 million spent on Road and transport assets Council spent more than $18.6 million on preserving, restoring and enhancing all road and transport related assets during the 2013-14. This has resulted in the reconstruction and rehabilitation of major roads within the network such as Bernera Road, Badgerys Creek Road, Greendale Road and Barry Road.

BEFORE AFTER

The Year in Review

Page 83: Annual Report 2013-14

Liverpool City Council Annual Report 2013-14 83

Rehabilitation and Resurfacing More than 45,000 square metres of pavement surface were treated at Chipping Norton and Cartwright areas to extend pavement service life.

Rehabilitation and resurfacing works were completed at:

• Reilly Street, Lurnea • Barry Road ,Chipping Norton • Badgerys Creek Rd, Badgerys Creek • Kinkuna Street, Busby • Kaluga Street, Busby • Macquarie Street, Liverpool • Mcilwain Street, Ashcroft • Smith Crescent, Liverpool • Winnall Place, Ashcroft • Macquarie Street, Liverpool • Barry Road, Chipping Norton • Watts Road, Kemps Creek • Adams Road, Luddenham • Wolstenholme Avenue, Greendale • Western Road, Kemps Creek • Twelfth Avenue, Kemps Creek • King Street, Rossmore.

Shared Paths ConstructionCouncil secured grant funding through the State Government’s River Cities Bike Program, which enabled the construction of a total of 7.4 kilometres of shared paths including 1.6 kilometres in 2013-14. More than 2.3 kilometres of new paved pathways were provided in the established and older release areas of Liverpool.

BEFORE AFTER

Page 84: Annual Report 2013-14

Liverpool City Council Annual Report 2013-14 84

Road upgrades to support growth Major road upgrades were undertaken within the Prestons area to support current and predicted future growth in the residential and industrial release areas of Prestons, Carnes Hill, Edmondson Park and Horningsea Park.

REJUVENATION PROGRAM WAS UNDERTAKEN AT:

The Streets located in Chipping Norton:

• Beachcomber Place • Brigantine Street • Buckingham Crescent • Clipper Close • Ebb Tide Street • Frank Oliveri Drive • Galleon Close • Horsham Place • Mead Place • Rudham Place • Sanctuary Place • Sea Spray Court • Witham Place • Yachtsman Drive

The Streets located in Hinchinbrook:

• Coronation Drive • Groote Avenue • Linnie Place • Melville Close • Newry Place • Pentecost Street • Petrel Place • Pigeon Place • Pipet Place • Rottnest Avenue • Saddleback Close • Sandplover Close • St Peters Close • Sunbird Close • Swift Place • Tern Place • Robin Street

WORK COMPLETION RATE

100% OF THE SCHEDULED FOOTPATH WORKS TO MEET DISABILITY STANDARDS WERE COMPLETED

85% OF THE NEW FOOTPATH PROGRAM WORKS WERE COMPLETED

75% OF SCHEDULED CYCLE- WAYS PROGRAM WORKS WERE COMPLETED

The Year in Review (continued...)

Bus Stop and Road ConstructionThere were 64 bus stops installed and 2.4 kilometres of road constructed this year.

Page 85: Annual Report 2013-14

Liverpool City Council Annual Report 2013-14 85Liverpool City Council Annual Report 2013-14 85

MANAGING COUNCIL ASSETS

IntroductionCouncil is responsible for the management, care and control of a wide range of infrastructure assets. These include public roads and other transport related facilities, floodplain and drainage networks, parks, reserves and recreational facilities, property and buildings. The combined replacement cost of these is more than $1.96 billion.

The scope and value of assets managed by Council is shown in the figure below.

CURRENT REPLACEMENT COSTINFRASTRUCTURE ASSETS 2014

ROADS $1,098m

56%DRAINAGE

$434m22%

BUILDINGS $278m14%

PARKS $149m

8%

Managing Council AssetsAsset management planningCouncil has a comprehensive suite of asset management planning documents in place which are in line with current best practice.

Asset Renewal and ReplacementDuring the year, Council continued its capital works program to renew and replace infrastructure assets. Works were funded from the following income sources:

• special rate variation; • stormwater management service charge; • grants from Commonwealth and State governments for a range of infrastructure projects; and

• Council’s own funding sources including section 94 developer contributions.

Page 86: Annual Report 2013-14

Liverpool City Council Annual Report 2013-14 86

MANAGING COUNCIL ASSETS

Road and Transport Assets Council is responsible for the care, control and management of more than 853 kilometres of formed roads. Approximately seven kilometres of this network is unsealed and 36 kilometres has regional road status. During 2013-14 an additional 13 kilometres of new roads were added to the network as a result of new subdivision, mostly in the Middleton Grange and Edmondson Park urban release areas.

Council continued to implement road pavement management strategies to progressively upgrade assets that are in poor condition, while focusing on preventing assets that are in fair or good condition from falling into the poor category.

Road Pavement and Assets Survey A condition survey of Council’s road pavement assets was completed in 2013. The following graph illustrates

the historical performance trend of Council’s road network condition (expressed as Pavement Condition Index, PCI) from 1995 to 2014. As seen from the condition graph, the network condition has gradually improved since 2010 resulting in a substantial reduction in the asset renewal gap. This is because Council has implemented its asset management plan and increased its budget for pavement maintenance and renewal.

Drainage Assets Council’s drainage assets include more than 547 kilometres of piped drainage systems and associated pits, gross pollutant traps, flood retention basins, formed channels and waterways with a combined value of more than $433 million.

Council uses state-of-the-art CCTV to assess the structural condition and hydraulic performance of its drainage network. These inspections provide Council with accurate condition data and digital imagery of its pipe network.

ROAD NETWORK CONDITION (1995 TO 2014)AVERAGE PCI

9

8

7

6

5

4

3

2

1

0

1994

1995

1996

1997

1998

1999

2000

2001

2002

2003

2004

2005

2006

2007

2008

2009

2010

2011

2012

2013

2014

2015

Page 87: Annual Report 2013-14

Liverpool City Council Annual Report 2013-14 87

Parks and Recreational Facilities Council manages a portfolio of more than 500 open space reserves, consisting of regional, district and local open space made up of active, passive reserves and natural bushland. The portfolio includes 115 recreational and sporting facilities including netball courts, tennis courts, cricket nets, skate ramps and aquatic centres. These assets cover approximately 1400 hectares of land and have a combined replacement cost of more than $149 million.

Buildings Council cares for 210 buildings which have a wide range of uses and include office space, parking stations, aquatic centres and heritage buildings. The combined replacement cost of these buildings is currently more than $278 million.

Condition of AssetsCouncil has built up a comprehensive database of all its assets to facilitate necessary planning and valuation of its assets to a high level of accuracy. Council’s ongoing asset surveys continue to provide valuable data to objectively determine asset condition and performance. This has enabled Council to proactively develop maintenance and renewal strategies and programs that are responsive and cost effective.

The condition and performance information for some of Council’s key assets are summarised below:

100%

90%

80%

70%

60%

50%

40%

30%

20%

10%

0%Roads Bridges Footpaths Buildings Playgrounds Drainage GPT

CONDITION OF INFRASTRUCTURE ASSETSPercentage in each condition state

ASSET CATEGORY:

CONDITION STATE: EXCELLENT GOOD AVERAGE POOR VERY POOR

Page 88: Annual Report 2013-14

Liverpool City Council Annual Report 2013-14 88

Infrastructure Report CardThe table below shows the infrastructure report card indicating the overall situation of each category of Council assets. All Council assets are “In Control” situation indicating that its Asset Management Plans are effective.

ASSETSREPLACEMENT COST

SS7 COST TO SATISFACTORY

ASSET RATING

Roads $1,098,152,000 $38,585,000

Drainage $433,489,000 $14,824,000

Buildings $277,519,000 $4,400,000

Parks $148,668,000 $5,079,000

TOTAL $1,957,828,000 $62,888,000

Condition of Assets The following table provides average condition of Council’s assets and the costs to upgrade and maintain these assets to ensure they continue to provide satisfactory standards of service over the long term.

ASSET DESCRIPTION QUANTITY

CURRENT REPLACEMENT

COST

AVERAGE CONDITION

AS AT JUNE 2014

EST. COST TO BRING TO

SATISFACTORY STANDARD

EST. ANNUAL COST OF

MAINTAINING ASSET AT THAT

STANDARD

ANNUAL MAINTENANCE EXPENDITURE

2013-14

ROAD AND TRANSPORT $1,098,152,000 $38,585,000 $22,521,000 $18,591,000

Roads 853 km $674,322,000 Good $36,077,000 $19,442,000 $14,213,000

Kerb and gutter 1271 km $193,241,000 Good $908,000 $450,000 $1,481,000

Footpath and cycleways

657 km $109,184,000 Good $363,000 $1,531,000 $1,658,000

Bridges and culverts 103 No $49,662,000 Good $507,000 $291,000 $328,000

Road furniture and structures

$60,009,000 Good $476,000 $690,000 $692,000

Off street car parks 119 $11,734,000 Good $254,000 $117,000 $219,000

FLOODPLAIN AND DRAINAGE $433,489,000 $14,824,000 $2,607,000 $1,769,000

Pipes 547 km $322,540,000 Good $11,192,000 $1,868,000 $1,214,000

Pits 22,667 No $78,777,000 Good $2,723,000

Headwalls 1275 No $3,197,000 Average $111,000 $103,000 $92,000

Retarding Basins 57 $17,187,000 Good $590,000 $241,000 $90,000

Gross Pollutant traps 114 $5,787,000 Excellent $0 $290,000 $81,000

Wetlands 19 No $6,001,000 Good $208,000 $105,000 $292,000

BUILDING ASSETS $277,519,000 $4,400,000 $5,366,000 $4,364,000

Admin Building 1 $43,141,000 Average $0 $805,000 $683,000

Aquatic Centres 6 $38,326,000 Good $0 $751,000 $474,000

Bush Fire / SES 9 $2,409,000 Good $249,000 $54,000 $24,000

Childcare Centres 11 $11,339,000 Good $0 $268,000 $364,000

KEY: In control Monitor Action required

1 2 3 4 5

Page 89: Annual Report 2013-14

Liverpool City Council Annual Report 2013-14 89

ASSET DESCRIPTION QUANTITY

CURRENT REPLACEMENT

COST

AVERAGE CONDITION

AS AT JUNE 2014

EST. COST TO BRING TO

SATISFACTORY STANDARD

EST. ANNUAL COST OF

MAINTAINING ASSET AT THAT

STANDARD

ANNUAL MAINTENANCE EXPENDITURE

2013-14

Commercial Properties

2 $10,872,000 Good $0 $215,000 $90,000

Community Centres 38 $50,505,000 Good $0 $966,000 $895,000

Heritage Buildings 14 $34,569,000 Good $1,137,000 $644,000 $359,000

Libraries, Museums 3 $22,245,000 Good $0 $429,000 $364,000

Multi-Level Car Parks 2 $23,492,000 Average $0 $429,000 $143,000

Parks Buildings / Structures

111 $33,777,000 Good $794,000 $644,000 $505,000

Works Depot 13 $6,844,000 Poor $2,220,000 $161,000 $463,000

PARKS AND RECREATION $148,668,000 $5,079,000 $9,158,000 $8,692,000

Sporting Fields/ Ovals 92 $35,049,000 Good $1,251,000 $2,015,000 $2,042,000

Sporting Facilities 115 $7,105,000 Average $254,000 $458,000 $486,000

Natural Reserves 32 $9,217,000 Good $329,000 $549,000 $451,000

Parks, gardens and streetscapes

509 $87,956,000 Good $2,313,000 $5,220,000 $4,656,000

Playground equipment

155 $8,712,000 Average $932,000 $824,000 $982,000

Wharves, Jetties, Boat ramps

6 $629,000 Average $0 $92,000 $75,000

GRAND TOTAL $1,957,828,000 $62,888,000 $39,652,000 $33,416,000

1 2 3 4 5

NOTES:

Current replacement cost - estimated cost to replace existing asset with modern equivalent which will deliver same service potential.

Average condition - an overall assessment of the average condition of assets within an asset category, selected from one to five condition levels comprising excellent, good, average, poor and very poor or unserviceable.

Estimated cost to bring to Satisfactory Standard - estimated cost required to bring assets within an asset group to a condition level equal to or better than “good” (satisfactory) as required by the Division of Local Government’s Planning and Reporting Manual for Local Governments in NSW - 2010. Following an independent review, Council’s estimated cost to bring assets to satisfactory standard at the end of this financial year decreased significantly. Key reasons included:

a) In prior years, Council used its own asset condition assessment standard which was comparatively higher than that provided by the Office of Local Government, resulting in higher estimated cost to bring assets to “satisfactory” condition. This fact was highlighted by an independent firm of Morrison Low.

b) Council completed a comprehensive condition assessment and rating of its road pavement assets in 2013 as part of its periodic condition survey program. Analysis of data indicated that there has been a significant improvement in the condition of the road with 7% of the network being improved from below average to above average condition over the last 3 years. Similarly, the road network in excellent condition has increased by 11% as a result of Council’s recent investment in road network improvements and the addition of new road assets. This has resulted in significant reduction in cost to bring to “satisfactory” condition compared to the cost reported in previous years.

c) Council traditionally reported cost to bring assets to “satisfactory” condition Standard as the “practical” cost to renew/upgrade assets. The implication of this approach was the estimated cost deemed to bring the asset to an “excellent”

condition. The revised estimated cost reported only includes the portion of cost that would be required to bring the assets to the required “satisfactory” condition.

d) The average conditions of buildings are based on a comprehensive survey undertaken at the end of 2012. Most of the amenities/toilet blocks located in parks and reserve are considered to be fit for the intended purpose with a lower maintenance requirement. Further, most of the small sheds and structures at the depot will be demolished in coming years. These structures have been excluded from any upgrade requirements.

e) Approximately 120km of the rural road network lie predominantly within the South West Growth Centre and the ensuing residential and commercial development will ultimately see the full reconstruction, widening and upgrades to a majority of the roads. In view of this, Council will only implement its low cost strengthening and stabilisation strategies in these areas, which aim to hold these rural roads in a reasonable condition until full reconstruction can occur. The revised value of asset maintenance backlog reflects this enhanced maintenance strategy.

Estimated annual cost of maintaining asset at Satisfactory Standard – This estimates annual expenditure required to maintain all assets within an asset group at a “satisfactory” condition on an on-going basis.

Annual maintenance expenditure - Council’s actual expenditure during the financial year for the purpose of maintaining, preserving or restoring assets.

Length of Stormwater Pipes – As survey of all known stormwater pits and pipes within Liverpool has been completed and mapped. The current length has been calculated from the map layer which shows a reduction of 43km of pipes reported last year. The main reason for this reduction is that table drains and pipes in minor culverts and driveway crossings in rural areas were included as stormwater pipes in the previous report. These assets are now considered as part of minor culverts and included in Headwall and minor culvert category.

1

2

3

4

5

6

Page 90: Annual Report 2013-14

Liverpool City Council Annual Report 2013-14 90

Annual telephone survey

1.4

1.2

1.0

0.8

0.6

0.4

0.2

0.0CBD On-street

$1,216,661

$295,055 $292,323

$1,037,253

$353,704

$288,593

$ m

illio

n

Northumberland Street Bathurst Street

2012 - 2013 2013 - 2014

COMMUNITY SATISFACTION WITH ACCESS TO PUBLIC TRANSPORT EXPERIENCED A DROP BETWEEN 2011 AND 2012 BUT IS BEGINNING TO RISE AGAIN. COMMUNITY SATISFACTION WITH CONTROLS OVER ILLEGAL PARKING CONTINUES TO DECLINE.

3.7

3.6

3.5

3.4

3.3

3.2

3.1

3.0

2.9

2.8Access to Public

TransportControls over illegal

parking

2011 2012 2013

COMMUNITY SATISFACTION – ACCESSIBLE CONNECTED CITY

PARKING IN THE CITY CENTRE

Page 91: Annual Report 2013-14

Liverpool City Council Annual Report 2013-14 91

CONSTRUCTION OF KURRAJONG AND BERNERA ROADSThis project involves the reconstruction and widening of Kurrajong and Bernera roads to improve access to major commercial, industrial and residential areas in Liverpool. Once completed, a direct east to west link will be available from the Hume Highway to Cowpasture Road, significantly improving traffic conditions and access across the local government area.

To date, Council has spent more than $25 million and substantially completed Bernera Road from Camden Valley Way to M7 and Kurrajong Road from Bernera Road to Kookaburra Road.

Key deliverables this year:

Bernera Road pavement, landscaping and footpaths Council undertook major construction works between Kurrajong Road and Camden Valley Way. Redesign of electrical services and tendering of electrical and landscaping works were completed.

Kurrajong Road pavement and bridge over Cabramatta Creek Design plans for construction were completed this year and works are expected to commence early in 2015 and completed during the year.

WI-FI IN THE CITY CENTRE Wi-Fi hotspots were installed in the Liverpool city centre to provide residents, workers and visitors with access to internet and enhance usage of the public spaces in the city centre, attracting new users to the area and encouraging an increase in length of stay.

Hot spot locationsThere were 31 hot spot locations installed this year.

Wi-Fi integration Council’s Wi-Fi is multi-layered and integrated with other state of the art technology such as Closed Circuit Television. Wi-Fi was launched in September 2014.

Page 92: Annual Report 2013-14

Liverpool City Council Annual Report 2013-14 9292

PROGRESS BY DEPARTMENT

PERFORMANCE INDICATOR

CIVIL CONSTRUCTION AND ASSETS

BUILDINGS CONSTRUCTION

OPEN SPACE CONSTRUCTION

SUSTAINABLE ENVIRONMENT

TRANSPORT PARKING

INFRASTRUC-TURE AND ENVIRONMENT TOTAL

Approved budget

$25,333,929 $6,678,464 $4,117,074 $659,779 $479,887 $37,269,133

Actual expenditure

$19,061,008 $4,516,048 $3,072,041 $431,693 $1,800 $27,082,590

Total number of projects

82 29 31 1 1 144

Number of projects completed

67 (82%) 23 (79%) 26 (84%) 0 (0%) 0 (0%) 116 (81%)

Number of projects carried over

15 (16%) 7 (9%) 4 (7%) 1 (1%) 1 (1%) 28 (19%)

THIS YEAR, COUNCIL SPENT $27 MILLION ON CAPITAL PROJECTS WITH 116 OF THE PLANNED 144 PROJECTS BEING COMPLETED. 28 OF THESE PROJECTS HAVE BEEN CARRIED OVER TO 2014-15.

CAPITAL WORKS STATUS REPORT -INFRASTRUCTURE & ENVIRONMENT

Page 93: Annual Report 2013-14

Liverpool City Council Annual Report 2013-14 93

Page 94: Annual Report 2013-14

94

This direction is about Council, its customers and operations. Council will place customer satisfaction, innovation and best practice at the centre of all its operations, continuing to build on its strong financial position by effectively and efficiently managing its resources and asset.

Direction 07.

Leading Proactive City

Page 95: Annual Report 2013-14

Liverpool City Council Annual Report 2013-14 95

Direction 07. Leading Proactive City

PROGRESS AGAINST PRINCIPAL ACTIVITIES

Civic and Corporate LeadershipAll 7 actions were on track/completed

Financial Sustainability3 actions were on track/completed

1 action is in progress/carried over to next year

Governance8 actions were on track/completed

1 action is in progress/carried over to next year

1 action will not be completed

Information Technology 3 actions were on track/completed

1 action is in progress/carried over to next year

Workforce Management All 9 actions were on track/completed

1 year Actions

10-YEAR STRATEGIESPosition Council as an industry leader, delivering best practice and innovation.

Lead partnerships and collaboration with community, business and governments.

Provide business excellence and financial sustainability to deliver.

10-YEAR COMMUNITY GOALSThese are the goals for the city of Liverpool. Everyone has a role in achieving these goals, whether they are a government department, business or resident in Liverpool.

INCREASED NUMBER OF PEOPLE WHO REPORT SATISFACTION OR BETTER WITH THE OVERALL PERFORMANCE OF COUNCIL70% of people in 2013, which is a 10% increase from 2012. (source: Annual Telephone Survey)

90% ORGANISATIONAL CLIMATE SCORECouncil had an organisational climate score of 65.29 in 2012. (soure: 2012 Liverpool City Council Climate Survey)

A FINANCIAL SUSTAINABILITY RATING OF STRONGWITH AND A POSITIVE FINANCIAL OUTLOOK.Council’s latest assessment from T-Corp was ‘Strong with a Negative outlook.’

STRATEGIC PROJECTS PROJECT NAME STATUS Website Optimisation Completed.

Property Strategy Project is still under-way and has been carried over to 2014-15

12% delayed

88% on

track

Page 96: Annual Report 2013-14

Direction 07. Leading Proactive City

Liverpool City Council Annual Report 2013-14 96

Mobile Mayoral Offices Pop-up Mayor and Councillors’ Office were introduced. They have been a very popular initiative and an effective means of encouraging the community to engage and interact with their elected representatives and Council staff. From November 2013 to May 2014 a total of 10 mobile offices were held at various locations around the Liverpool Local Government Area. The locations, dates and times they were held are:

• 9 Nov 2013 – Chipping Norton Shops • 9 Nov 2013 – Wattle Grove Shops • 14 Dec 2013 – Prestons Shops • 14 Dec 2013 – Carnes Hill Marketplace • 9 Feb 2014 – Family Defence Day, Holsworthy Park Oval

• 22 Mar 2014 – Cecil Hills Shops • 22 Mar 2014 – Green Valley Shops • 22 Mar 2014 – Miller Shops • 31 May 2014 – Lakeside Shops • 31 May 2014 – Wattle Grove Shops

Training and Development Council organises a range of learning and development initiatives to develop a high performing workforce. These include:

• A training needs and skills analysis conducted in April 2014 to identify the development needs of Council’s employees. The analysis has assisted in the creation of the ‘Developing Our People Program’ which will ensure Council’s workforce remains skilled, knowledgeable and responsive, now and into the future.

• Council’s e-learning system was upgraded to improve efficiency and automation.

• Council received approximately $100,000 from the Federal Government to host two crucial skills enhancement qualifications courses in the areas of Diploma of Project Management and Certificate IV in Training and Education for staff.

Information and Communications Technology (ICT) Strategy (2014-2016)A draft Information and Communications Technology (ICT) Strategy has been developed to enable consistent technological innovation that assists Council to achieve its business objectives and continually improve performance.

Return on Investment Portfolio Council’s return on investment portfolio for the year ended 30 June 2014 at 4.2% exceeded the UBSW benchmark of 2.6%.

Debt Service Ratio Council’s projected debt service ratio is within the Division of Local Government benchmark of 10%. A balance of $4.8 million from the $6.5 million loan drawn on 30 June 2009 was reset at a fixed interest rate of 4.94% for 10 years in the June quarter.

The Year in Review

Page 97: Annual Report 2013-14

Liverpool City Council Annual Report 2013-14 97

Shining Stars Award Ceremony The Annual ‘Shining Stars’ Awards Ceremony was held on 25 March 2014. There were 81 staff nominated and 60 staff were recognised for excellence and achievement in customer service, innovation, teamwork and leadership. Council’s Communications and Events team was awarded the overall winner for the Shining Stars Awards.

Website Council continued to improve the functionality of its website to provide easy and reliable access to information and services.

Enhancements this year include the introduction of a translation capability, a mega menu for easy search, social media integration and the launch of ‘Snap, Send, Solve’, a smartphone application which allows the community to send customer requests via their smartphones. The top 5 pages visited this year were Careers, Planning and Development, Contact Us, Liverpool’s Planning Control and Waste and Recycling.

Growing Liverpool 2023 and its associated documents Growing Liverpool 2023 is the future direction for the City of Liverpool. It outlines the 10-year plan to transform Liverpool into a vibrant and dynamic city which is the destination of choice for business, living and recreation. This long term plan was launched at a special luncheon on 18 September 2014. More than 3,500 people including members of the community, business and government representatives were consulted to formulate this plan.

The Delivery Program and Operational Plan translates the directions and strategies in the Growing Liverpool 2023 into actions. It outlines the principal activities and services that Council will deliver over four years to move Liverpool forward. Council endorsed the 2013-17 Delivery Program and 2014-15 Operational Plan and budget at its June meeting.

Strategic Projects for 2014-15 include:

• Building Our New City • Liverpool Night Markets • Warwick Farm Bypass Road

The document set the direction for all of Council’s operations now and into the future.

Page 98: Annual Report 2013-14

Liverpool City Council Annual Report 2013-14 98

AMOUNTS INCURRED IN RELATION TO LEGAL PROCEEDINGS

In 2013-14 Council was involved in the following legal proceedings and incurred costs as shown in the table below:

CASE MATTER STATUS OUTCOME COST

Moorebank Recyclers Pty Ltd v Liverpool City Council [2013] NSWLEC 95

Moorebank Recyclers Pty Ltd took legal action to secure easements over Council land.

Finalised Moorebank Recyclers secured easements over Council land and Council was awarded compensation and costs.

$108,633

Hoxton Park Residents Action Group Inc v Liverpool City Council & Ors

Hoxton Park Residents Action Group commenced Class 4 proceedings questioning the validity of a development consent granted by the Joint Regional Planning Panel in February 2013.

Ongoing. The parties are attending to all necessary matters to prepare the matter for hearing in the Land and Environment Court

Not applicable. $28,945

Liverpool City Council v Oakvale Capital Limited

Council is part of joint action in the Federal Court of Australia against Oakvale for breaches of contract and duty of care and misleading and deceptive conduct for certain investment losses realised.

Ongoing. The parties are attending to all necessary matters to attend a formal mediation.

Not applicable. $45,640

Australian Turf Club v Liverpool City Council

Class 1 proceedings (2) in the Land and Environment Court, appealing Council deemed refusal of development applications.

Finalised Appeal was upheld and the Court approved the development.

$37,558

Farah Georges v Liverpool City Council

Class 1 proceedings in the Land and Environment Court, appealing Council deemed refusal of a development application.

Ongoing Not applicable. $8,469

Bellfield Group v Liverpool City Council

Class 1 proceedings in the Land and Environment Court, appealing an Order issued by Council.

Ongoing Not applicable. $2,499

Liverpool City Council v Maller Holdings

Class 5, criminal prosecution proceedings in the land & Environment Court for the alleged development without consent at 17 Manning Street, Warwick Farm.

Ongoing Matter heard. Council appealed judgement. Hearing date set for October 2014.

$64,234

ACM Corporation v Liverpool City Council

Class 1 proceedings in the Land and Environment Court, appealing Council refusal of a development application

Ongoing This matter is on hold pending outcome of Liverpool City Council v Maller Holdings.

Managed by in-house counsel*

United Services Union v Liverpool City CouncilIRC Appeal

Dispute in relation to aspect of commercial tenders.

Finalised Council partially successful in IRC Appeal. Dispute substantially resolved.

$4,256

Liverpool City Council v Dallal

Local Court Prosecution for failure to comply with an Order

Finalised Fine upheld.Fine $1,500 plus costs.

$3,296

Liverpool City Council v Nuwarra Investments

Local Court Prosecution for development not in accordance with consent conditions

Finalised Fine upheld.Fine $11,000 plus costs

Managed by in-house counsel* $3,300 -Disbursements

Page 99: Annual Report 2013-14

Liverpool City Council Annual Report 2013-14 99

CASE MATTER STATUS OUTCOME COST

Liverpool City Council v Hussain

Appeal of Local Court decision to the Land and Environment Court

Finalised Appeal upheld. Fine $75,000.

Managed by in-house counsel* $4,400 -Disbursements

Liverpool City Council v Bochard

Local Court Prosecution for Traffic Infringement

Finalised Fine upheldFine $150

Managed by in-house counsel*

Liverpool City Council v Chamma

Local Court Prosecution for Traffic Infringement

Finalised Fine upheld.Offence Proven.

Managed by in-house counsel*

Liverpool City Council v Kingsley

Local Court Prosecution for Traffic Infringement

Finalised Fine upheldFine $150

Managed by in-house counsel*

Liverpool City Council v Kredie

Local Court Prosecution for Traffic Infringement

Finalised Fine upheld.Offence Proven.

Managed by in-house counsel*

Liverpool City Council v Lenthall

Local Court Prosecution for Traffic Infringement

Finalised Fine upheld.Offence Proven.

Managed by in-house counsel*

Liverpool City Council v Khan

Local Court Prosecution for Traffic Infringement

Finalised Fine upheld.Offence Proven.

Managed by in-house counsel*

Liverpool City Council v Murrendy

Local Court Prosecution for Failure to Comply with Swimming Pool Order

Ongoing Matter set down for hearing in July 2014.

Managed by in-house counsel*

Liverpool City Council v Woolworths

Local Court Prosecution for Failure to Comply with Food Safety Order

Finalised Matter withdrawn.Undertakings obtained.

Managed by in-house counsel*

Liverpool City Council v S Polistina

Local Court Prosecution for Failure to Comply with Local Government Order

Finalised Fine upheld.Fine $330

Managed by in-house counsel*

Liverpool City Council v Pham

Local Court Prosecution for Traffic Infringement

Finalised Fine upheld.Fine $200 plus Court costs

Managed by in-house counsel*

Liverpool City Council v Tawdrous

Local Court Prosecution for Traffic Infringement

Finalised Fine upheld.Fine $400 plus Court costs

Managed by in-house counsel*

Liverpool City Council v Sharaf

Local Court Prosecution for Traffic Infringement

Finalised Fine upheld.Fine $200

Managed by in-house counsel*

Liverpool City Council v Sydney Computer Games

Local Court Prosecution for Traffic Infringement

Finalised Fine upheld.Offence Proven.

Managed by in-house counsel*

Liverpool City Council v Lindgreen

Local Court Prosecution for Traffic Infringement

Finalised Matter withdrawn Managed by in-house counsel*

Liverpool City Council v Caridi

Local Court Prosecution for Traffic Infringement

Finalised Fine upheld.Offence Proven.

Managed by in-house counsel*

Page 100: Annual Report 2013-14

Liverpool City Council Annual Report 2013-14 100

WORK, HEALTH AND SAFETY (WHS) Council is required to comply with relevant legislation including the Workplace Health and Safety Act 2011.

A system audit was conducted by WorkCover NSW in accordance with Council’s Self Insurance License and was evaluated as a highly conformant and compliant system.

A WHS Management Plan for 2013-14 was developed and includes various targets and objectives that are relevant to reducing workplace injuries, identifying hazards and the enhancing Council’s existing inspection and audit schedule. Targets and objectives have been formulated to ensure that Council provides a safe working environment for its staff and encourages a proactive approach to safety.

Workers Compensation claims for the period of 1 July 2013 to 30 June 2014 were 44.

Council also has a Workplace Health and Safety Committee in place to discuss issues, review changes to process and oversee implementation of the WHS Management Plan and System.

EQUAL EMPLOYMENT OPPORTUNITY MANAGEMENT PLAN

Council supported equity in employment through building employment practices that support and reflect the demographic identity of the Liverpool community. Council has redesigned recruitment strategies with the intention of simplifying the process of applying for Council positions, ensuring that all applicants have clear and consistent pathways for applying for vacancies.

Current employees are supported to improve their qualifications through study assistance or targeted qualification programs that have application across different disciplines working within Council. Council has also rolled out a number of short programs aimed at improving employee skills in the areas of delivering customer service, disability awareness and understanding our diverse community. Through these programs, 20 staff have completed Certificate III in Asset Maintenance, 25 staff have enrolled in Certificate III in Horticulture, 20 staff enrolled in Diploma in Project Management and 16 staff enrolled in Certificate IV in Training and Assessment and 46 staff registered in the Learning and Development Scheme.

In the interests of providing a sustainable workforce, Council has created 5 trainee positions within the Department of Planning and Growth to foster opportunities for entry into Council employment most particularly for young people who are currently studying at University or TAFE.

Page 101: Annual Report 2013-14

Liverpool City Council Annual Report 2013-14 101

SPECIAL RATE VARIATION Council introduced a special rate variation of 9% commencing 1 July 2009. The purpose of this variation is to allow Council to increase its maintenance budget by $0.6 million and capital works by approximately $5 million annually to undertake more enhanced maintenance and fund much needed infrastructure works which bring community infrastructure up to a satisfactory standard.

Council commenced community consultation on the possible extension of a special rate variation in October 2013. More than 3,500 responses were received, with the majority of respondents supporting continuation of the existing 9% special rate variation (SRV). As a result of this, Council resolved to submit an application to the Independent Pricing and Regulatory Tribunal (IPART) for a special rates increase of 9.7% in addition to the 2.3% standard rate peg. IPART subsequently approved Council’s application for the SRV to continue on a permanent basis.

The additional works that have been funded by the special rate variation during 2013-14 are listed in the table below.

PROJECTS PARTLY OR FULLY FUNDED FROM SPECIAL RATE VARIATION

FUNDING FROM SRV ($)

TOTAL EXPENDITURE ($)

Buildings $986,205 $664,606

Child Care Centre rehabilitation and renovation $79,000 $79,000

Audit on vulnerability of Councils buildings to fire and vandalism $50,000 $50,000

Community Centre rehabilitation program $160,000 $126,500

Implementation of Disability Action Plan $160,000 $130,000

Wenden 50m Pool Investigation $34,100 $25,680

Whitlam Park 3-4 Amenity Building Renewal Design $65,000 $25,460

Whitlam Toilet Roof Renewal $56,105 $56,055

Davy Robinson Reserve Stage 2 Pontoon and Boat Ramp Construction $382,000 $171,911

Parks & Recreation $385,700 $504,379

Floodlighting staged upgrade program -Dwyer Oval $135,000 $147,000

Implementation of Disability Action Plan (DAP)-Parks $50,700 $60,000

Playground replacement program $200,000 $297,379

Roads, Bridges and Footpaths $4,468,300 $10,250,980

Amalfi Street, Lurnea - Graham Street to Boundary Street. $17,912 $376,146

Badgerys Creek Road, Badgerys Creek - Multiple Failed Sections $25,500 $535,500

Barry road ,Chipping Norton - Governor Macquarie to Riverside $53,650 $1,126,650

Bridge rehabilitation & Renewal $50,000 $50,000

Bus shelters - renewal and replacement $21,000 $21,000

Bus stops $47,250 $47,250

Campbell Street, Liverpool - Wombat Crossing $25,000 $52,500

Carpark renewal and replacement $47,250 $47,250

Castlereagh Street, Liverpool – Moore street to Elizabeth street $22,625 $475,117

Challoner Avenue, Chipping Norton - Longstaff To Alfred $13,000 $13,000

Page 102: Annual Report 2013-14

Liverpool City Council Annual Report 2013-14 102

PROJECTS PARTLY OR FULLY FUNDED FROM SPECIAL RATE VARIATION

FUNDING FROM SRV ($)

TOTAL EXPENDITURE ($)

Church road, Moorebank - Bradshaw to Moorebank $7,536 $95,250

Cycleway- Jedda road, Prestons - Joadja road to Hill road stage 2 $65,000 $136,500

Dalmeny Dr, Prestons - Bus Bay $40,000 $84,000

Disability Action Plan $45,150 $45,150

Footpath & Cycleway Restoration - General $38,850 $38,850

Gemas Street, Holsworthy - South End to Bardia $40,000 $40,000

Glenfield Road, casual - kerb & gutter $28,875 $28,875

Greendale Road, Bringelly - 500m either side of Tyson $60,100 $1,262,090

Kaluga Street, Busby - St Johns to Trevanna $443,376 $443,376

Kerb & gutter replacement $112,140 $112,140

Kinkuna Street, Busby - Orchard to Bolinda $230,132 $230,132

Longstaff Avenue, Chipping Norton - Challoner to Lewin $35,000 $35,000

Macquarie Street, Liverpool - Campbell to Highway $41,900 $879,900

Maddecks Avenue, Moorebank -Stockton To J/Osull $36,000 $36,000

Mcilwain Street, Ashcroft - Mernagh to Strickland $264,835 $264,835

Pavement stabilisation & strengthening $525,000 $525,000

Pedestrian access & mobility plan $31,405 $59,955

Priddle Street, Warwick Farm -Scrivener to Manning $33,000 $33,000

Reilly Street, Lurnea - Liverpool to Wonga $29,083 $392,623

Safety Barrier - bridge approaches $31,500 $31,500

Safety barrier renewal program $31,500 $31,500

Smith Crescent, Liverpool - Flowerdale to Flowerdale $341,910 $341,910

St Pauls Crescent, Liverpool - Dale to Maryvale $299,988 $299,988

Talbingo Place, Heckenberg - Tumbarumba to North end $216,237 $216,237

Traffic facilities - new works $56,700 $56,700

Traffic facilities - renewal program $37,800 $37,800

Tumbarumba Crescent, Heckenberg - Sadleir to Thredbo $787,332 $787,332

Whitford Road, Green Valley - Green Valley to North Liverpool $36,308 $762,468

Winnall Place, Ashcroft - Mcilwains to North End $198,456 $198,456

Grand Total $5,840,205 $11,419,965

102

Page 103: Annual Report 2013-14

Liverpool City Council Annual Report 2013-14 103103

NUMBER OF STAFF

800

750

700

650

600

5502011-12 2012-13 2013-14

644

680

772

STAFF TURNOVER RATE

800

750

700

650

600

5502011-12 2012-13 2013-14

11%

9.6%

11.8%

11% LG AVERAGE 2013-14

Page 104: Annual Report 2013-14

Liverpool City Council Annual Report 2013-14 104Liverpool City Council Annual Report 2013-14 104

INCOME EXPENDITURE PERFORMANCE

OPERATING EXPENDITURE

$155

$150

$145

$140

$135

$130

$1252011-12

$ M

ILLI

ON

S

2012-13 2013-14

$135.8m

$144.4m

$151.4m

$250

$200

$150

$100

$50

$02011-12

$ M

ILLI

ON

S

2012-13 2013-14

$135.8m

$197.2m

$144.4m

$191.5m

$151.4m

$185.9m

Operating expenditure (millions) Income (millions)

Page 105: Annual Report 2013-14

Liverpool City Council Annual Report 2013-14 105105

CAPITAL WORKS EXPENDITURE

$90

$80

$70

$60

$50

$40

$30

$20

$10

$02011-12

$ M

ILLI

ON

S

2012-13 2013-14

$77.5m$74.1m

$47.1m

Page 106: Annual Report 2013-14

Liverpool City Council Annual Report 2013-14 106

PROPERTY RENTAL INCOME: 52 SCOTT STREET

PROPERTY RENTAL INCOME: 33 MOORE STREET

$2,450

$2,400

$2,350

$2,300

$2,250

$2,200

$2,150

$2,100

$2,050

$2,000

$1,950

$000

's

$2,119,338

2012/13 2013/14

Budget Actual

$2,386,108

$2,211,900 $2,201,205 $2,119,338

$000

's

$1,000

$900

$800

$700

$600

$500

$400

$300

$200

$100

$0

$682,600 $681,944

$920,161 $944,928

2012/13 2013/14

Budget Actual

Page 107: Annual Report 2013-14

Liverpool City Council Annual Report 2013-14 107

CONTRACTS AWARDED BY COUNCIL During 2013-14 Council awarded the following contracts for amounts greater than $150,000 (other than employment contracts).

CONTRACT NUMBER

CONTRACT DESCRIPTION CONTRACTOR (S)

PRICE (GST INCLUSIVE OVER CONTRACT TERM)

WT2348 Construction of Amalfi Park Detention Basin, Graham Avenue, Lurnea

Civil Constructions Pty Ltd $3,863,580

WT2273 Construction of Culvert at Creek Crossing, Pacific Palms Circuit Hoxton Park

Civil Constructions Pty Ltd $931,128

WT2292 Public Lighting Works at Bernera Road and Kurrajong Road, Prestons

Connect Infrastructure Pty Ltd $653,490

WT2302 Design and Construction of Pool Backwash Treatment System at Whitlam Leisure Centre

Neverstop Water Harvesting Pty Ltd $532,854

ST2248 Supply and Delivery of Trees and Shrubs Panel Contractors: • Alpine Nurseries Sales Pty Ltd• Green Leisure Group Pty Ltd T/A• Andreasens Green Wholesale

Nurseries, • Greenhaven Garden Centre Pty Ltd• Greening Australia NSW• Muru Mittigar Ltd, Toolijooa Pty Ltd

$220 000

ST2328 Supply and Delivery of Two (2) Wood Chippers

Marriott Tree Equipment T/A Bandit Tree Equipment

$177,600

WT2308 Havard Park Upgrade – Portion A Landscape Works

Furnass Landscaping Enterprises Pty Ltd $212,312

WT2313 Supply and Install Boat Ramp & Pontoon Davy Robinson Reserve

Land Marine Ocean Engineering Pty Ltd $707,663

WT2287 Renewal of Air Conditioning & Ventilation System at the Liverpool City library

lntegral Electrical Engineering Co Pty Ltd $1,441,925

LGP0213 Supply of Electricity • Power Direct• AGL• ERM Power Retail

Annual Schedule of Rates

ST2297 Urban design for Liverpool City Centre revitalisation

• Urbis Pty ltd (Macquarie Mall and Bigge Park precincts)

• SJB Architecture (NSW) (Eat Street precinct)

• Architectus Group Pty Ltd (Gateways to the City and Linkages to the Georges River precincts)

$573,591

PST2258 Detailed Design and Documentation for the Carnes Hill Community and Recreation Centre

Suters Architects $1,235,630

WR02-12/13 Handling and Treatment of Asbestos and Hazardous Waste

• RMA Contracting Pty Ltd t/a• RMA Group (asbestos handling only)• Affective Services Australia Pty Limited

(asbestos handling and chemical handling)

• Dolomatrix Trading as Toxfree Pty Ltd (asbestos handling only)

• Beasy Pty Ltd (asbestos handling only)

Schedule of rates

Page 108: Annual Report 2013-14

Liverpool City Council Annual Report 2013-14 108

CONTRACT NUMBER

CONTRACT DESCRIPTION CONTRACTOR (S)

PRICE (GST INCLUSIVE OVER CONTRACT TERM)

WR06-12/13 Pavement Marking • Complete Linemarking Services Pty Ltd

• Combined Traffic Management Pty Ltd• Allstate Linemarking Services Pty Ltd• Gumbay Holdings Pty Ltd t/a Avante

Linemarking

Schedule of rates

WT2275 Public Safety CCTV and Public Wi-Fi SAT Pty Ltd $1,211,396

ST2272 Management of Leisure and Aquatic Centres YMCA NSW $4,380,000

WT2253 Roads & Drainage Works • Civil Constructions Pty Ltd • Citywide Civil Engineering NSW Pty

Portion B1: $338,339Portion B2: $ 310,042.71

ST2207 Cleaning of Childcare Centres • Storm International Pty Ltd • Childcare Cleaning Specialists Pty Ltd

Schedule of rates

WT2238 Local Park Upgrades AE Reay Park and Bunya Park

• GJ’s Landscapes Pty Ltd • Lamond Contracting Pty Ltd

$88,823.96$158,468.00

WT2241 Supply of Ready Mixed Concrete • Advanced Ready Mixed Concrete P/L• Concrite Pty Ltd and • Hi-Quality Sitemix Pty Ltd

Est $200,000 over entire term

PST2164 Supply of Library Materials • James Bennett Pty Ltd • Digital Education Services

Est $450,000 over entire term

ST2237 Security Services • Moresmate Pty Ltd T/A NSS Group Est $500,000 - $700,000 over entire term