37
Unit (Nos) Financial Unit (Nos) Financial Division Range Round Beat Compart ment No. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 (A) Special provision for protected areas - camping material 5 Ha. 2.500 Nashik Jamnya L.Amba L.Amba-2 129 N 21º 21'37.7" E 075º 38' 07.5" 1 Total Special Provision for protected area 20 10.00 15 Ha. 10.000 (B) Habitat augmentation measures in Pa & non - pa areas 2 0.500 Nashik Pal Pal Garbirdi Maondyachar-1 Lohara 62, 39 Deepening, repairing & cleaning of water holes Nashik Anerdam Shirpur Sule Sule Dahiwad 979, 988, 1013 N 21º 22.929 E 074º 58.550 Deepening, repairing & cleaning of water holes 1 2 0.400 Nashik NMS __ __ __ N 20º 00.27.9" E 074º 06.14.9" N 20º 00.45.9" E 074º 05.28.9" Deepening, repairing & cleaning of water holes 2 Total Habitat Augmentation measures 9 1.90 9 1.900 Component Particulars/Sub component of Work (As given in A.P.O./sanctioned work) ANNUAL PLAN OF OPERATION 2013-14 FINAL REPORT Format VII ------------ Works under N.P.V. Component (For works other than JFMCs and VEDCs) (Rs. Lakhs) Physical and Financial Target as per A.P.O./sanctioned work Physical and Financial Achievement Location of works (whenever required) Reasons, if any, for excess or less Phusical@Financia l Achievement (Give information Projecwise) Lat/Long of worksite Detials of work done No. of photograp h of the worksite/w ork done attached 3 0.600 9 1.90 Medow development 20 10.00 3 Wildlife Management in and Outside Protected Areas Water holesdeepening and de-siltion of old ones.

ANNUAL PLAN OF OPERATION 2013-14 FINAL … WL Nashik.pdf · N.G.O. 1 Catering training 1 ... Madhmashi Palan Training 1 0.40 1 40000 0 __ kothlae Training of Madhmashi Palan (15

Embed Size (px)

Citation preview

Unit

(Nos)

Financial Unit

(Nos)

Financial Division Range Round Beat Compart

ment No.

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

(A) Special provision for protected areas -

camping material

5 Ha. 2.500 Nashik Jamnya L.Amba L.Amba-2 129 N 21º 21'37.7"

E 075º 38' 07.5"

1

Total Special Provision for protected area 20 10.00 15 Ha. 10.000

(B) Habitat augmentation measures in Pa & non -

pa areas

2 0.500 Nashik Pal Pal Garbirdi Maondyachar-1

Lohara

62, 39 Deepening,

repairing & cleaning

of water holes

Nashik Anerdam

Shirpur

Sule Sule Dahiwad 979, 988,

1013

N 21º 22.929

E 074º 58.550

Deepening,

repairing & cleaning

of water holes

1

2 0.400 Nashik NMS __ __ __ N 20º 00.27.9"

E 074º 06.14.9"

N 20º 00.45.9"

E 074º 05.28.9"

Deepening,

repairing & cleaning

of water holes

2

Total Habitat Augmentation measures 9 1.90 9 1.900

Component Particulars/Sub component of Work (As given in

A.P.O./sanctioned work)

ANNUAL PLAN OF OPERATION 2013-14 FINAL REPORT

Format VII ------------ Works under N.P.V. Component (For works other than JFMCs and VEDCs) (Rs. Lakhs)

Physical and

Financial Target as

per

A.P.O./sanctioned

work

Physical and Financial

Achievement

Location of works (whenever required)Reasons, if any,

for excess or less

Phusical@Financia

l Achievement

(Give information

Projecwise)

Lat/Long of

worksite

Detials of work

done

No. of

photograp

h of the

worksite/w

ork done

attached

3 0.600

9 1.90

Medow development 20 10.00

3 Wildlife

Management in

and Outside

Protected Areas

Water holesdeepening and de-siltion of old ones.

Unit

(Nos)

Financial Unit

(Nos)

Financial Division Range Round Beat Compart

ment No.

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

Component Particulars/Sub component of Work (As given in

A.P.O./sanctioned work)

Physical and

Financial Target as

per

A.P.O./sanctioned

work

Physical and Financial

Achievement

Location of works (whenever required)Reasons, if any,

for excess or less

Phusical@Financia

l Achievement

(Give information

Projecwise)

Lat/Long of

worksite

Detials of work

done

No. of

photograp

h of the

worksite/w

ork done

attached

(A) New Civil Works

Type I Qqarter 1 9.00 1 9.000 A.Bad Nagad Bhildari Mehun 94 N 20 21 180

E 075 10 486

Type-I quarter

completed

1

Type II Quarter 1 11.20 1 11.200 A.Bad Nagad Bhildari Mehun 94 N 20 21 954

E 075 11 178

Type-II quarter

completed

1

Type III Quarter 1 12.50 1 12.500 A.Bad Yedshi Yedshi Yedshi 164 N 18 18 264

E 054 56 56.48

Type-III quarter

completed

1

Nature Information Center remaining work 1 10.00 10.000 A.Bad Nagad Bhildari Mehun 94 N 20 21 900

E 075 10 665

Construction of

Entry Gate

completed

1

Construction of Entry Gate 1 3.00 1 3.000 A.Bad Nagad Saigavan Saigavan 549 N 20 22 729

E 075 11 092

Nature information

center work

completed

1

Sub Total New Civil Works 5 45.70 45.700

(B) Improving connectivity in sensetive Forests areas to facilitete all season patrolling

19.62 8 19.620Nashik Jamnya Gadrya Gadrya-1 114 N 21º 22' 34.7"

E 075º 44' 39.3"

Construction of

culvert1

Nashik Jamnya Gadrya Gadrya-2 114 N 21º 22' 36.5"

E 075º 44' 55.9"

Construction of

culvert1

(C) Repairs and Renovation of Old building and

structure

1 0.500 Nashik Jamnya Usmali Jamnya-3 117 N 21º 21'50.3"

E 075º 42' 32.5"Repairing of quarter

1

5 6.600 Nashik Jamnya Jamnya L.Amba -1 125 N 21º 22'03.3"

E 075º 38' 43.4"

Repairing of Labour

shed (5 Unit)

1

2 5.600 Nashik Jamnya Usmali Jamnya - 3 117 N 21º 21'49.7"

E 075º 42'33.0"

Repairing of Labour

shed (2 Unit)

with WC bath

2

2 13.20 9 13.200

3 7.800 Nashik Jamnya Usmali Jamnya - 3 117 N 21º 21' 50.3"

E 075º 42' 32.5"

Repairing of quarter

(3 Unit)

1

1 8.50 4 8.500

Additional Principal Chief Conservator of Forests,

(Wildlife), Nashik

5

Type I Quarter

Type II Quarter

Improving connectivity

8.501

2 13.20

16

ANNUAL PLAN OF OPERATION 2013-14 FINAL REPORT

Format VII ------------ Works under N.P.V. Component (For works other than JFMCs and VEDCs) (Rs. Lakhs)

Remarks

16

Remarks

Additional Principal Chief Conservator of Forests,

(Wildlife), Nashik

Achievement

Particulars of work Physical

target

Financial

target

Physical

achievement

Financial

achievement.

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21

2012-13

6 36.00 Computer training 1 0.30 1 30000 0 __ __ 1

Guide training 1 0.40 1 40000 0 __ __ 1

Tracking & Camping material 1 0.50 1 50000 0 __ __

Nature trail Penshet to

Kalsubai 2.00 K.m.

2 0.80 2 80000 0 __ __ 1

Iron Information board 20 1.00 20 100000 0 __ __ 1

Creation of fire protection

team

3 0.15 3 15000 0 __ __

Creation of Grazing & illicit

cutting team

7 0.35 7 35000 0 __ __

Home stead Basis 2 2.50 2 250000 0 __ __ 1

Total 37 6.00 37 600000 0

Computer training 1 0.30 1 30000 0 __ __ Training of

Computer (10

Trainy)

1

Guide training 1 0.30 1 30000 0 __ __ Training of

Guide to 10

Trainy by

N.G.O.

1

Catering training 1 0.50 1 50000 0 __ __ Training of

Catering to 50

Trainy

1

Tracking & Camping material 1 0.50 1 50000 0 __ __ Purchase of

Tracking &

Campining

Material

Repairing of Nature trail

Penshet to Kalsubai 2.00 K.m.

4 0.40 4 40000 0 __ __ Repairing

Nature trail

Ratanwadi

village to

Ratanwadi

Gad 4.00 K.m.

1

Iron Information board 20 1.00 20 100000 0 __ __ Preparing Iron

Information

board

1

Creation of fire protection

team

5 0.25 5 25000 0 __ __ 5 Fire watchers

& fire fighters

Creation of Grazing & illicit

cutting team

5 0.25 5 25000 0 __ __ protection

work of

grazing &

illicit cutting

Penshet

Ratanwadi

RemarksDetails of Target

Works prescribed as microplan

Nashik

Wildlife

Nashik

Wildlife

ANNUAL PLAN OF OPERATION 2013-14 ------------- FINAL REPORT

Format VI ------------------ Works carried out by VEDC under A.P.O. 2013-14 (Rs. Lakhs)

Division Range Round Beat Microplan

sanction No.

& Date

Microplan

sanctioning

authority

Target as per

sanctioned A.P.O.

Physical and Financial Achievement Reasons, if

any for exess

or less

Physical/Fina

ncial

Achievement

(Give

Information

VEDC wise)

Lat/Log of

worksite

Details of work

done

No. of

photograph

of the

worksite/w

ork done

attached.

Physical Financial Name of

VEDC

Circle Amount

balance

with

VEDC at

the end of

March

2014

Penshet No. 1719

Dt.

15/1/2013

C.F. (W.L.)

Nashik

Bhandardara Uddawane Raranwadi No. 1714

Dt.

15/1/2013

C.F. (W.L.)

Nashik

Bhandardara Uddawane

Achievement

Particulars of work Physical

target

Financial

target

Physical

achievement

Financial

achievement.

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21

RemarksDetails of Target

Works prescribed as microplanDivision Range Round Beat Microplan

sanction No.

& Date

Microplan

sanctioning

authority

Target as per

sanctioned A.P.O.

Physical and Financial Achievement Reasons, if

any for exess

or less

Physical/Fina

ncial

Achievement

(Give

Information

VEDC wise)

Lat/Log of

worksite

Details of work

done

No. of

photograph

of the

worksite/w

ork done

attached.

Physical Financial Name of

VEDC

Circle Amount

balance

with

VEDC at

the end of

March

2014

Home stead Basis 2 2.50 2 250000 0 __ __ Maintenance

of Eco- huts

under eco-

tourism for

tourist as per

Para No. 2 of

G.R. Dtd.

24/10/2011

1

40 6.00 40 600000 0

Computer training 1 0.30 1 30000 0 __ __ 1

Guide training 1 0.30 1 30000 0 __ __ 1

Catering training 1 0.50 1 50000 0 __ __ 1

Tracking & Camping material 1 0.50 1 50000 0 __ __

Repairing of Nature trail

Penshet to Kalsubai 2.00 K.m.

4 0.40 4 40000 0 __ __ 1

Iron Information board 20 1.00 20 100000 0 __ __ 1

Creation of fire protection

team

5 0.25 5 25000 0 __ __

Creation of Grazing & illicit

cutting team

5 0.25 5 25000 0 __ __

Home stead Basis 2 2.50 2 250000 0 __ __ 1

40 6.00 40 600000 0

Solar Lamp 100 2.00 100 200000 0 0 0 1

Dustbin 3 0.15 3 15000 0 0 __ 1

Tent 6 0.85 6 85000 0 0 __ 1

Iron Information board 20 1.00 20 100000 0 0 __ 1

Guide Training 1 0.50 1 50000 0 0 __ 1

Training of Vermicompost 1 0.50 1 50000 0 0 __ 1

Creation of fire protection

team

7 1.00 7 100000 0 __ __

138 6.00 138 600000 0

Solar Street Light 9 1.723 9 172300 0 __ N19º24.693'

E73º49.329'

N19º24.458'

E73º49.224'

N19º24.521'

E73º49.259'

N19º24.585'

E73º49.165'

N19º24.835'

E73º49.348'

N19º24.595'

E73º49.166'

N19º24.039'

E73º49.358'

N19º24.683'

E73º49.339'

N19º24.455'

E73º49.234'

9 Solar Street

light fixing in

Kothale village

1

Ratanwadi

Samrad

Dindori Tas

Kothale

Nashik

Wildlife

Nashik

Wildlife

Nandur M __ __ No. 1716

Dt.

15/1/2013

C.F. (W.L.)

Nashik

C.F. (W.L.)

Nashik

Rajur Ambit Kothale 1717 Dt.

15/1/2013

CF (WL)

Nashik

Bhandardara Uddawane Samrad No. 1718

Dt.

15/1/2013

Bhandardara Uddawane Raranwadi No. 1714

Dt.

15/1/2013

C.F. (W.L.)

Nashik

Achievement

Particulars of work Physical

target

Financial

target

Physical

achievement

Financial

achievement.

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21

RemarksDetails of Target

Works prescribed as microplanDivision Range Round Beat Microplan

sanction No.

& Date

Microplan

sanctioning

authority

Target as per

sanctioned A.P.O.

Physical and Financial Achievement Reasons, if

any for exess

or less

Physical/Fina

ncial

Achievement

(Give

Information

VEDC wise)

Lat/Log of

worksite

Details of work

done

No. of

photograph

of the

worksite/w

ork done

attached.

Physical Financial Name of

VEDC

Circle Amount

balance

with

VEDC at

the end of

March

2014

Dustbin 5 0.25 5 25000 0 __ kothale Purchase of

Dustbin

1

Tent 6 1.10 6 110000 0 __ Kothlae Purchase of

Tent

1

Papad Lonche Training 1 0.400 1 40000 0 __ kothale Training of

Papd, Lonche

(20 Trainee)

1

Shivankaam Training 1 0.40 1 40000 0 __ kothale Training of

Stiching (10

Trainee)

Madhmashi Palan Training 1 0.40 1 40000 0 __ kothlae Training of

Madhmashi

Palan (15

Trainee)

1

Solar Lamp 30 0.450 30 45000 0 __ kothale Supply of

Solar Lamp. to

30

Benefisheries.

1

Smokeless Chulha 20 0.375 20 37500 0 __ kothlae Supply of

Smokeless

Chulha to 20

Benefisheries

1

Compitation Book 140

Books

0.30 140 Books 30000 0 __ Kothale Purchase of

Compition

Books

1

Tracking & Camping

Instrument

2 set 0.50 2 Set 50000 0 __ Kothale Purchase of

Tracking &

Campining

Material

Table & Cupboard Each 1 0.102 Each 1 10200 0 __ kothlae Purchase of

Table &

Cupboard

Total 6.00 600000 0

Bhanasgaon Aurangabad

Wildlife

Yedshi Yedshi Yedshi 2734/16-03-2013Dy.CF (WL)

A.Bad

Construction of Cement

Bandhara

1 6.00 Construction of

Cement Bandhara-1

600000 0 N 18 15 70

E 075 56 585

1

6 36.00 Total 256 36.00 3600000 0

Kothale

Nashik

Wildlife

Nashik

Wildlife

Rajur Ambit Kothale 1717 Dt.

15/1/2013

CF (WL)

Nashik

Achievement

Particulars of work Physical

target

Financial

target

Physical

achievement

Financial

achievement.

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21

RemarksDetails of Target

Works prescribed as microplanDivision Range Round Beat Microplan

sanction No.

& Date

Microplan

sanctioning

authority

Target as per

sanctioned A.P.O.

Physical and Financial Achievement Reasons, if

any for exess

or less

Physical/Fina

ncial

Achievement

(Give

Information

VEDC wise)

Lat/Log of

worksite

Details of work

done

No. of

photograph

of the

worksite/w

ork done

attached.

Physical Financial Name of

VEDC

Circle Amount

balance

with

VEDC at

the end of

March

2014

2013-14

L.P.G. 50 50 2.00 50 200000 0 __ __ 1

Solar Street light - 7 7 1.40 7 140000 0 __ N 19º 32' 650" 1

Smokeless Chulha 40 40 0.75 40 75000 0 __ __ 1

Solar Lentern-50 50 0.75 50 75000 0 __ __ 1

Improve Chulha - 125 125 0.10 125 10000

Total 272 5.00 272 500000 0

L.P.G. 50 50 2.10 50 210000 0 __ __ Supply of

L.P.G. to 50

Benefisheries.

1

Solar Home Light - 30 30 0.90 30 90000 0 __ __ Supply of

Solar Home

Light. to 30

1

Total 80 3.00 80 300000 0

Construction of Entry Gate 1 2.00 Construction of

entry Gate

155523 0 N 20 19 500

E 075 02 377

Street light-4 82564 0 4

Home light-4 25600 0

Solar Cooker-20 60000 0

Energy Chulla 25 Energy Chulla-25 43125 0

Total 51 4.00 366812 0

Construction of Entry Gate 1 2.00 Construction of

entry Gate

200000 0 N 20 25 117

E 075 10 610

Street light-3 61923 0 1

Home light-4 25600 0

Solar Cooker-20 60000 0

Energy Chulla 25 Energy Chulla-25 43125 0

Total 51 4.00 390648 0

Construction of Entry Gate 1 2.00 Construction of

entry Gate

200000 0 N 20 22 532

E 075 08 474

Street light-3 61923 0 1

Home light-5 32000 0

Solar Cooker-20 60000 0

Energy Chulla 25 Energy Chulla-25 43125 0

Total 51 4.00 397048 0

Construction of Entry Gate 1 2.00 Construction of

entry Gate

200000 0 N 20 17 439

E 075 07 940

Street light-3 61923 0 2

Home light-6 35967 0

Solar Cooker-20 60000 0

Energy Chulla 25 Energy Chulla-25 43125 0

Total 51 4.00 401015 0

6 24.00 Total 556 24.00 2355523 0

12 60.00 Grand Total Grand Total 812 60.00 5955523 0

Additional Principal Chief Conservator of Forests,

(Wildlife), Nashik

6 24.00 Nashik

Wildlife

Hivarkheda

Bhildare

Solar equipment 25 2.00

Bhildare Nagad Bhildare Dy.CF(WL)

A.Bad

Hivarkheda Kannad Hivarkheda Dy.CF(WL)

A.Bad

Nashik

Wildlife

Aurangabad

Wildlife

Junone 1120/16-12-

2013

Haraswadi 1147/21-12-

2013

1149/21-12-

2013

1148/21-12-

2013

Junone Chalisgaon Bhodhara Dy.CF(WL)

A.Bad

Haraswadi Nagad Saigavan Dy.CF(WL)

A.Bad

Solar equipment 25 2.00

Solar equipment 25 2.00

Solar equipment 25 2.00

Amt.

Rs.44,477/-

Surrender

by DCF

(WL)

A.Bad

No. 674 Dt.

25/7/2013

C.F. (W.L.)

Nashik

Bhandardara Uddawane Uddawane No. 808 Dt.

14/8/2013

C.F. (W.L.)

Nashik

Ghatgaht

Uddawane

Bhandardara Uddawane Ghatghar

Sr.

No.

Division Executive

committee,

State

CAMPA

meeting date

Particulars of

work sanctioned

Physical

Target

Financial

Target

Physical

Achievement

Financial

Achievement

Location of

work

Reasons, if any

for excess or

less

Phusical/Financ

ial Achievement

Lat/long of

works done

Details of work

done

No. of

photograph of

the

worksite/work

done attached

Remarks

1 2 3 4 5 6 7 8 9 10 11 12 13 14

1 Nashik

Wildlife

E.C. meeting

dated

24-10-2013

Psychological

Training

interventions for

circle level

officers by 6th

Sense Resources

Pvt. Ltd.

Bangalore

1 1.00 1 1.00

Shekharu Hall

in the

A.P.C.C.F.

(Wildlife)

Nashik office

-- __

Psychological

Training

interventions for

circle level

officers by 6th

sense Resources

Pvt. Ltd.

Bangalore

__ __

Total 1 1.00 1 1.00

ANNUAL PLAN OF OPERATION 2013-14 FINAL REPORT

Format VIII ------------ Works carried out under Interest Amount provided from State CAMPA (Rs. Lakhs)

Additional Principal Chief Conservator of Forests,

(Wildlife), Nashik

Division Range Round Beat Compart

ment No.

1 2 3 4 5 6 7 8

(C) Fire & Forest Protection

A.Bad Nagad Bhildari Mehun at Purnwadi 94 N 20 21 947

E 075 11 202

A.Bad Nagad Saigavan Saigavan east 550 N 20 21 754

E 075 10 154

Nashik Jamnya L.Amba L.Amba-1 125 N 21º 22'04.9" E

075º 38' 45.6"

Total Fire & Forest Protection

Particulars/Sub component of Work

(As given in A.P.O./sanctioned

work)

Location of works (whenever required) Lat/Long of

worksite

CAMPA APO 2013-14 Physical & Financial Progress - Final Report

Photos

Photo

Check Naka

Total Mobility and Communication

Division Range Round Beat Compart

ment No.

1 2 3 4 5 6 7 8

Particulars/Sub component of Work

(As given in A.P.O./sanctioned

work)

Location of works (whenever required) Lat/Long of

worksite

Photo

Nashik Jamnya L.Amba L.Amba-2 129 N 21º 21'37.7" E

075º 38' 07.5"

Nashik Pal Garbirdi Garbirdi-1 28, 62 N 21º 20.419

E 075º 51.084 N

21º 22.210 E

075º 47.422

Nashik Bhandardara Uddawane Ghatghar 67 N 19º 33.399

E 073º 37.652

Nashik Pal Pal Garbirdi Maondyachar-1

Lohara

62, 39

Nashik Rajur Ambit Ambit Pachnai 114, 127 N 19º 25.510'

E 073º 45.525'

N 19º 25.311'

E 073º 45.404'

Medow development

Water holesdeepening and de-siltion

of old ones.

(A) Special provision for protected areas - camping material

(B) Habitat augmentation measures in Pa & non - pa areas

Total Special Provision for protected area

Division Range Round Beat Compart

ment No.

1 2 3 4 5 6 7 8

Particulars/Sub component of Work

(As given in A.P.O./sanctioned

work)

Location of works (whenever required) Lat/Long of

worksite

Photo

Nashik Anerdam

Shirpur

Sule Sule Dahiwad 979, 988,

1013

N 21º 22.929

E 074º 58.550

Nashik Anerdam

Shirpur

Sule Sule 988 N 21º 22.629

E 074º 58.623

Nashik Anerdam

Shirpur

Sule Dahiwad 1013 N 21º 22.709

E 074º 59.185

Nashik NMS __ __ __ N 20º 00.27.9"

E 074º 06.14.9"

N 20º 00.45.9"

E 074º 05.28.9"

Publicity awarness & workshop to

handle man-animal confict issue.

Nashik Bhandardara 0 0 0 SHENDI

Nashik __ __ __ __ __Awareness cration though films,

audio visual, workshops, seminars

and other programme. Production of

educational materials and their

dissemination among traget

communities and stake holders

through exhibitions, interpretation

centres, nature camps.

Water holesdeepening and de-siltion

of old ones.

Total Habitat Augmentation measures

(E) Publicity, Awareness cration & capacity building

Division Range Round Beat Compart

ment No.

1 2 3 4 5 6 7 8

Particulars/Sub component of Work

(As given in A.P.O./sanctioned

work)

Location of works (whenever required) Lat/Long of

worksite

Photo

Nashik Rajur Ambit Pachnai __ __

(A) New Civil Works

Type I Qqarter A.Bad Nagad Bhildari Mehun 94 N 20 21 180

E 075 10 486

Type II Quarter A.Bad Nagad Bhildari Mehun 94 N 20 21 954

E 075 11 178

Type III Quarter A.Bad Yedshi Yedshi Yedshi 164

Awareness cration though films,

audio visual, workshops, seminars

and other programme. Production of

educational materials and their

dissemination among traget

communities and stake holders

through exhibitions, interpretation

centres, nature camps.

Division Range Round Beat Compart

ment No.

1 2 3 4 5 6 7 8

Particulars/Sub component of Work

(As given in A.P.O./sanctioned

work)

Location of works (whenever required) Lat/Long of

worksite

Photo

Nature Information Center

remaining work

A.Bad Nagad Bhildari Mehun 94 N 20 21 900

E 075 10 665

Construction of Entry Gate A.Bad Nagad Saigavan Saigavan 549 N 20 22 729

E 075 11 092

Sub Total New Civil Works

(B) Improving connectivity in sensetive Forests areas to facilitete all season patrolling

Nashik Jamnya Gadrya Gadrya-1 114 N 21º 22' 34.7"

E 075º 44' 39.3"

Nashik Jamnya Gadrya Gadrya-2 114 N 21º 22' 36.5"

E 075º 44' 55.9"

Improving connectivity

Division Range Round Beat Compart

ment No.

1 2 3 4 5 6 7 8

Particulars/Sub component of Work

(As given in A.P.O./sanctioned

work)

Location of works (whenever required) Lat/Long of

worksite

Photo

Nashik Jamnya Gadrya Gadrya-1 114 N 21º 22' 40.2"

E 075º 45' 12.4"

Nashik Jamnya Gadrya Gadrya-1 113 N 21º 22' 34.0"

E 075º 44' 35.3"

Improving connectivity

Division Range Round Beat Compart

ment No.

1 2 3 4 5 6 7 8

Particulars/Sub component of Work

(As given in A.P.O./sanctioned

work)

Location of works (whenever required) Lat/Long of

worksite

Photo

Nashik Pal pal Mondyachar-1 62 N 21º 22' 49.6"

E 075º 46' 01.0"

Nashik Pal pal Mondyachar-2 62 N 21º 22' 49.2"

E 075º 45' 52.8"

Nashik Jamnya Usmali Jamnya-3 117N 21º 21'50.3" E

075º 42' 32.5"

Nashik pal pal pal

Forest

colony,

Pal

N 21º 21'36.4" E

075º 53' 59.9"

Type I Quarter

Improving connectivity

(C) Repairs and Renovation of Old building and structure

Division Range Round Beat Compart

ment No.

1 2 3 4 5 6 7 8

Particulars/Sub component of Work

(As given in A.P.O./sanctioned

work)

Location of works (whenever required) Lat/Long of

worksite

Photo

Nashik Jamnya Jamnya L.Amba -1 125N 21º 22'03.3" E

075º 38' 43.4"

Nashik Jamnya Usmali Jamnya - 3 117N 21º 21'49.7" E

075º 42'33.0"

Nashik Pal Pal Pal

Forest

colony,

Pal

N 21º 21'36.3"

E 075º 53' 59.8"

Nashik Jamnya Usmali Jamnya - 3 117N 21º 21' 50.3"

E 075º 42' 32.5"

Type I Quarter

Type II Quarter

CAMPA APO 2013-14 Physical & Financial Progress - Final Report

(A) Special provision for protected areas - camping material

(B) Habitat augmentation measures in Pa & non - pa areas

(E) Publicity, Awareness cration & capacity building

(C) Repairs and Renovation of Old building and structure

1 2 3 4 5 6 7

Computer training

Guide training

Nature trail Penshet to

Kalsubai 2.00 K.m.

Iron Information board

Penshet Nashik

Wildlife

Name of

VEDC

Division Range

CAMPA APO 2013-14 Physical & Financial Progress - Final Report

Photos

Particulars of work PhotoRound Beat

Bhandardara Uddawane Penshet

1 2 3 4 5 6 7

Name of

VEDC

Division Range Particulars of work PhotoRound Beat

Home stead Basis

Computer training

Guide training

Catering training

Repairing of Nature trail

Penshet to Kalsubai 2.00 K.m.

Penshet

Ratanwadi

Nashik

Wildlife

Nashik

Wildlife

Bhandardara Uddawane Penshet

Bhandardara Uddawane Raranwadi

1 2 3 4 5 6 7

Name of

VEDC

Division Range Particulars of work PhotoRound Beat

Iron Information board

Home stead Basis

Computer training

Guide training

Ratanwadi

Samrad

Nashik

Wildlife

Nashik

Wildlife

Bhandardara Uddawane Samrad

Bhandardara Uddawane Raranwadi

1 2 3 4 5 6 7

Name of

VEDC

Division Range Particulars of work PhotoRound Beat

Catering training

Repairing of Nature trail

Penshet to Kalsubai 2.00 K.m.

Iron Information board

Home stead Basis

Solar Lamp

Samrad

Dindori Tas

Nashik

Wildlife

Nashik

Wildlife

Bhandardara Uddawane Samrad

Nandur M __ __

1 2 3 4 5 6 7

Name of

VEDC

Division Range Particulars of work PhotoRound Beat

Dustbin

Tent

Iron Information board

Guide Training

Dindori Tas Nashik

Wildlife

Nandur M __ __

1 2 3 4 5 6 7

Name of

VEDC

Division Range Particulars of work PhotoRound Beat

Training of Vermicompost

Solar Street Light

Dustbin

Tent

Dindori Tas

Kothale

Nashik

Wildlife

Nashik

Wildlife

Rajur Ambit Kothale

Nandur M __ __

1 2 3 4 5 6 7

Name of

VEDC

Division Range Particulars of work PhotoRound Beat

Papad Lonche Training

Madhmashi Palan Training

Solar Lamp

Smokeless Chulha

Kothale Nashik

Wildlife

Rajur Ambit Kothale

1 2 3 4 5 6 7

Name of

VEDC

Division Range Particulars of work PhotoRound Beat

Compitation Book

Bhanasgaon Aurangabad

Wildlife

Yedshi Yedshi Yedshi Construction of Cement

Bandhara

L.P.G. 50

Solar Street light - 7

Kothale Nashik

Wildlife

Ghatgaht Bhandardara UddawaneNashik

Wildlife

Rajur Ambit Kothale

Ghatghar

1 2 3 4 5 6 7

Name of

VEDC

Division Range Particulars of work PhotoRound Beat

Smokeless Chulha 40

Solar Lentern-50

L.P.G. 50

Solar Home Light - 30

Uddawane Bhandardara Uddawane Uddawane

Ghatgaht Bhandardara UddawaneNashik

Wildlife

Nashik

Wildlife

Ghatghar

1 2 3 4 5 6 7

Name of

VEDC

Division Range Particulars of work PhotoRound Beat

Solar equipment

Solar equipment

Junone Aurangabad

Wildlife

Haraswadi Nagad Saigavan HaraswadiAurangabad

Wildlife

Chalisgaon Bhodhara Junone

1 2 3 4 5 6 7

Name of

VEDC

Division Range Particulars of work PhotoRound Beat

Solar equipment

Solar equipment

Hivarkheda Aurangabad

Wildlife

Bhildare Aurangabad

Wildlife

Kannad Hivarkheda Hivarkheda

Nagad Bhildare Bhildare

Sr.

No

.

Division Executive

Committee,

State CAMPA

Meeting date

Particulars of

work

sanctioned

Physical

Target

Financial

Target

Physical

Achieveme

nt

Financial

Achievem

ent

Location of

work

Reasons, if any,

for excess or

less Physical/

Financial

Achievement

Lat/Long of

worksite

Details of

work

done

No. of

photograph

of the

worksite/

work done

atttached

Remarks

1 2 3 4 5 6 7 8 9 10 11 12 13 14

2 A.Bad

Wildlife

-- Construction

of Entry Gate

-- -- -- 0.14477 Junone Detail report

subbkitted vide

this office letter

No.D-

1/Plan/25(12-

13)/264, Dtd. 25-

06-2014.

N 20 19 500

E 075 02 377

ANNUAL PLAN OF OPERATION 2013-14----------- FINAL REPORT

Format IX ----------------- Works carried out under Interest Amonut provided from State CAMPA (Rs. Lakhs)

Additional Principal Chief Conservator of Forests,

(Wildlife), Nashik