Annual Chinese New Year Lunch 3rd Feb 2020
Sime Darby Convention Centre
P2
P3
SIRIM 2nd Surveillance Audit was successfully carried out on 24th & 25th February 2020. Project selected for this audit was PANOR.
The audit has gathered enough evidence to conclude that the organization’s Quality Management System have been effectively
maintained in accordance to ISO 9001: 2015 Standard. SIRIM recommended that LLC INFRA Sdn Bhd continue to be certified under
ISO 9001: 2015. We achieved zero NCR and zero OFI in this Surveillance Audit.
On behalf of the ISO Council, I would like to thank everyone involved in this audit for their cooperation and support in making this
audit a success.
P4
LLC INFRA SDN BHD
No Employee Name Position Dept Eff Date
1 LOH KIT SOONG Sr. Engineer LRT3T 02-01-2020
2 NURUL SHAFINAZ BINTI SHAHIDAN Verification & Validation Engineer Cum Lead Auditor LRT3T 02-01-2020
3 CHOO JUN HOU Document Controller cum Procurement Exec LRT3T 13-01-2020
4 MOHAMMAD SHAFIFI BIN SUHAILI Trackwork Engineer LRT3T 13-01-2020
5 SYED NAHAR BIN SYED ABDULLAH Senior Risk Engineer LRT3T 16-01-2020
6 MOHD SALLEHUDDIN BIN ABDUL JALIL QA/QC Manager LRT3T 20-01-2020
7 MOHAMAD HAFIZUDIN BIN ISMAIL Sr Interface Engineer (M&E) LRT3T 03-02-2020
8 NARAYAN SASHANGKAR Mechanic P&M 04-02-2020
9 CHENG CHEE LIM Chief Land Surveyor LRT3T 17-02-2020
10 CHAN SOOK SHEN Sr. Contract Exec. LRT3T 02-03-2020
WATER ENGINEERING TECHNOLOGY SDN BHD
1 NG PENG PENG Senior Drafter Drafting 02-01-20
2 AHMAD RAZIMI BIN SALLEH Drafter Drafting 02-01-20
3 LAU TZY CHERN Project Engineer Contracts 03-02-20
4 SITI NORSHAHIRAH BINTI MD DERUS OSHE Executive Contracts 10-02-20
WET ENVITECH SDN BHD
1 MUHAMAD AMIRUN HAKIM BIN NOR HAILI Operator Langat-CSTP 13-01-20
2 MUHAMAD NASRUDDIN BIN MOHAMED KAPI Plant Operator Langat-CSTP 10-03-20
3 MUHAMMAD SYAHRUL AMAR BIN MOHAMMAD
OSMAN Plant Operator Langat-CSTP 16-03-20
We take this opportunity to welcome those new joiner(s) to our big family and wish them success in their appointment.
Kindly render your fullest support and cooperation to enable them to discharge their duties. P5