Annual Development Highlights 2014 January 1, 2014 - December 31, 2014 Community Planning, Housing & Development Produced by the Department of Community Planning, Housing and Development: Planning Division, Urban Design & Research. February 2015. Office (GFA) Retail (GFA) Other (GFA) Residential: Total (Units) Residential: Multifamily (Units)* Residential: Single Family (Units) Hotel Rooms Approvals 688,542 77,328 32,250 1,121 1,114 7 161 Construction Starts - 60,370 354,295 1,253 1,105 148 - Completions 616,770 87,007 38,884 1,539 1,376 163 - Demolitions 59,737 80,232 44,444 173 143 30 - Summary of 2014 Development Activity Report Summary Methodology Annual development highlight reports are generated from County staff reports, County Board minutes, and data on Certificate of Occupancy (CO) permits, building permits, and demolitions permits. The approval date is the date the project was approved by the County Board (by-right projects will not have an approval date). The construction start date is based on the date the first building permit was approved for the project, and projects are classified as under construction when construction activity commences above grade. Completed projects are those where a CO has been issued. In general, an office or retail project is determined to be complete if at least 50% of certificates have been issued to the project. For multi-family residential projects, completion is determined based on the issuance of a CO for the middle floor of the building. In some cases, projects were determined to be complete or under construction based on site visits by Planning Division staff. Demolished projects are those where a Demolition permit has been issued. The projects contained in this report are only those that add or subtract new density (i.e., residential units, hotel rooms, or gross floor area) to current residential, hotel, office, retail and other space** inventories that are privately owned or County owned in Arlington. *The Multifamily residential unit subtotal includes high rise buildings, garden style buildings, townhouses, and duplexes. 1 As Arlington County embarks on its fourth decade of Transit Oriented Development, Arlington continues to encourage smart growth, mixed-use, walkable communities served by high quality transit. Development activity in 2014 continued to support this vision with the completion of six major residential projects and two major office projects, and the approval of seven major mixed-use projects and one elementary school addition. Strong Single Family and Multi-family Residential Growth Arlington continues to grow by focusing planned redevelopment in its mixed-use, major planning corridors. In 2014, 1,539 residential units were completed and by the end of 2014 an additional 2,800 residential units were under construction. Single family home construction continued showing increased development activity, surpassing pre-recession levels of construction starts, completions, and demolitions. In 2014, single family home completions were at the second highest level in the last ten years, with 2013 recording the highest number of completions. County Board approves mixed-use projects to replace vacant or outdated office buildings in Rosslyn, Ballston, and Crystal City. In Rosslyn, the County Board approved 1401 Wilson, replacing two outdated office buildings with a new mixed-use residential and office project. In Ballston, the outdated Marymount University (aka ‘Blue Goose’) building was approved to be demolished and replaced by a mixed-use office and a mixed-use residential building, and in Crystal City, a vacant office building was approved to be coverted to residential use for twenty years. Revitalization of Columbia Pike continues At the end of 2014, four Form Based Code projects containing over 400 residential units were under construction along Columbia Pike. During 2014, the Arlington Mill Residences were completed, one residential form based code project was approved, and three form based code projects were under review. These projects will continue the revitalization of Columbia Pike and further implementing the Code’s vision to create pedestrian-oriented development that will foster a vital “main street.” **Other space includes light industrial, government, institutional, schools, churches, and other types of uses.

Annual Development Highlights 2014 · Annual Development Highlights 2014 Community Planning, Housing & Development January 1, 2014 - December 31, 2014 roduced by the Department of

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Annual Development Highlights 2014 · Annual Development Highlights 2014 Community Planning, Housing & Development January 1, 2014 - December 31, 2014 roduced by the Department of

Annual Development Highlights 2014January 1, 2014 - December 31, 2014Community Planning, Housing & Development

Produced by the Department of Community Planning, Housing and Development: Planning Division, Urban Design & Research. February 2015.

Office (GFA) Retail (GFA) Other (GFA)Residential: Total

(Units)

Residential: Multifamily

(Units)*

Residential: Single Family

(Units) Hotel Rooms

Approvals 688,542 77,328 32,250 1,121 1,114 7 161

Construction Starts - 60,370 354,295 1,253 1,105 148 -

Completions 616,770 87,007 38,884 1,539 1,376 163 -

Demolitions 59,737 80,232 44,444 173 143 30 -

Summary of 2014 Development Activity

Report Summary

Methodology

Annual development highlight reports are generated from County staff reports, County Board minutes, and data on Certificate of Occupancy (CO) permits, building permits, and demolitions permits.

The approval date is the date the project was approved by the County Board (by-right projects will not have an approval date). The construction start date is based on the date the first building permit was approved for the project, and projects are classified as under construction when construction activity commences above grade. Completed projects are those where a CO has been issued. In general, an office or retail project is determined to be complete if at least 50% of certificates have been issued to the project. For multi-family residential projects, completion is determined based on the issuance of a CO for the middle floor of the building. In some cases, projects were determined to be complete or under construction based on site visits by Planning Division staff. Demolished projects are those where a Demolition permit has been issued.

The projects contained in this report are only those that add or subtract new density (i.e., residential units, hotel rooms, or gross floor area) to current residential, hotel, office, retail and other space** inventories that are privately owned or County owned in Arlington.

*The Multifamily residential unit subtotal includes high rise buildings, garden style buildings, townhouses, and duplexes.

1

As Arlington County embarks on its fourth decade of Transit Oriented Development, Arlington continues to encourage smart growth, mixed-use, walkable communities served by high quality transit. Development activity in 2014 continued to support this vision with the completion of six major residential projects and two major office projects, and the approval of seven major mixed-use projects and one elementary school addition.

Strong Single Family and Multi-family Residential Growth

Arlington continues to grow by focusing planned redevelopment in its mixed-use, major planning corridors. In 2014, 1,539 residential units were completed and by the end of 2014 an additional 2,800 residential units were under construction. Single family home construction continued showing increased development activity, surpassing pre-recession levels of construction starts, completions, and demolitions. In 2014, single family home completions were at the second highest level in the last ten years, with 2013 recording the highest number of completions.

County Board approves mixed-use projects to replace vacant or outdated office buildings in Rosslyn, Ballston, and Crystal City.

In Rosslyn, the County Board approved 1401 Wilson, replacing two outdated office buildings with a new mixed-use residential and office project. In Ballston, the outdated Marymount University (aka ‘Blue Goose’) building was approved to be demolished and replaced by a mixed-use office and a mixed-use residential building, and in Crystal City, a vacant office building was approved to be coverted to residential use for twenty years.

Revitalization of Columbia Pike continues

At the end of 2014, four Form Based Code projects containing over 400 residential units were under construction along Columbia Pike. During 2014, the Arlington Mill Residences were completed, one residential form based code project was approved, and three form based code projects were under review. These projects will continue the revitalization of Columbia Pike and further implementing the Code’s vision to create pedestrian-oriented development that will foster a vital “main street.”

**Other space includes light industrial, government, institutional, schools, churches, and other types of uses.

Page 2: Annual Development Highlights 2014 · Annual Development Highlights 2014 Community Planning, Housing & Development January 1, 2014 - December 31, 2014 roduced by the Department of

Development Tracking Report Third Quarter 2012Annual Development Highlights 2014

Approvals

0

0.5

1.0

1.5

2.0

2.5

3.0

20142013201220112010200920082007200620052004

GFA

in m

illio

ns o

f Squ

are

Feet

Calendar Year

Office, Retail, and Other Space Approved by Year (2004-2014)

Office (GFA) Retail (GFA) Other (GFA)

0

500

1,000

1,500

2,000

2,500

3,000

20142013201220112010200920082007200620052004

Num

ber o

f Res

iden

tial U

nits

or H

otel

Roo

ms

Calendar Year

Residential Units and Hotel Rooms Approved by Year (2004-2014)

Residential - Total (Units) Hotel (Rooms)

Approval Summary for 2014

Approvals - New Site Plans

• 1401 Wilson Blvd (SP #429)• 2401 Wilson Blvd (SP #404)• The Springs (SP #430)

Approvals - Use Permit

• 10th Street Flats• McKinley Elementary School Addition• Two Unified Residential Developments:

Honeysuckle Hills and URD associated with SP #404.

Approvals Office (GFA) Retail (GFA) Other (GFA)Residential: Total

(Units)

Residential: Multifamily

(Units)*

Residential: Single Family

(Units) Hotel Rooms

2014 Amount 688,542 77,328 32,250 1,121 1,114 7 161

10 Year Annual Avg.** 728,821 112,701 182,328

1,306 1,303 3 203(2004-2013)

*The Multifamily residential unit subtotal includes high rise buildings, garden style buildings, townhouses, and duplexes.

2

Approvals - Major Site Plan Amendments

• Marymount University (SP #64)• WeLive (SP #11)

Approvals - Form Based Code

• 4707 Columbia Pike

Detailed project information is available on page 3 and in the tables attached to the end of this report.

Office

OtherRetail

10 Year Average(2004-2013)

Residential

Hotel

10 Year Average(2004-2013)

Approved PDSP density that has not gone through Final Site Plan (FSP)

Approved PDSP density that has not gone through Final Site Plan (FSP)

**The 10 Year Approval Average only counts Final Site Plan (FSP) projects. Remaining PDSP allocations are not included in 10-year average totals.

Page 3: Annual Development Highlights 2014 · Annual Development Highlights 2014 Community Planning, Housing & Development January 1, 2014 - December 31, 2014 roduced by the Department of

Development Tracking Report Third Quarter 2012Annual Development Highlights 2014

Development Name AreaSite Plan Number Office (GFA) Retail (GFA) Other (GFA)

Residential Units Hotel Rooms

Rosslyn-Ballston Corridor

1401 Wilson Blvd Rosslyn 429 513,004 55,540 0 274 0

2401 Wilson Blvd Courthouse 404 0 1,280 0 0 161

URD associated with SP 404 Courthouse URD 0 0 0 4 0

10th Street Flats Clarendon UCMUD 4,704 3,660 0 144 0

Marymount University Ballston 64 165,204 3,000 0 267 0

The Springs Ballston 430 5,630 0 0 104 0

Rosslyn-Ballston Corridor Subtotal - - 688,542 63,480 0 793 161

Jefferson Davis CorridorWeLive (Crystal Plaza VI Conversion) Crystal City 11 0 5,848 0 252 0

Jefferson-Davis Corridor Subtotal - - 0 5,848 0 252 0

Columbia Pike Corridor4707 Columbia Pike Columbia Pike FBC 0 8,000 0 73 0

Columbia Pike Corridor Subtotal - - 0 8,000 0 73 0

Other AreasHoneysuckle Hills URD Other Area URD 0 0 0 3 0

McKinley Elementary School Addition Other Area UP 0 0 32,250 0 0

Arlington County Total - - 688,542 77,328 32,250 1,121 161

A project that is built under the site’s current zoning requirements is called a by-right (B/R) project. Within certain zoning districts, developers may apply for a “special exception” that allows for more flexibility in development form, use, and density than is permitted by-right. These special exceptions must go through public review and be approved by the County Board. The primary special exception process for large projects is the “site plan” process. Other special exceptions are granted through use permits, including unified residential and unified commercial mixed-use districts. In 2003, the County Board adopted a form based code for Columbia Pike; these form based code projects are either approved by-right or through the Use Permit Process.

The following tables and charts display all major projects (site plan or use permit) that were approved by the County Board in 2014 as well as all Form Based Code projects approved (either by-right or as a use permit) in 2014. By-right projects are not listed in this section as they are approved administratively.

SP #429: 1401 Wilson Blvd. SP #64: Marymount University

McKinley Elementary School Addition

SP #11: WeLive

Major projects approved in 2014

Defining Approvals

3

Page 4: Annual Development Highlights 2014 · Annual Development Highlights 2014 Community Planning, Housing & Development January 1, 2014 - December 31, 2014 roduced by the Department of

Development Tracking Report Third Quarter 2012Annual Development Highlights 2014

Construction Starts

0

0.2

0.4

0.6

0.8

1.0

1.2

20142013201220112010200920082007200620052004

GFA

in m

illio

ns o

f Squ

are

Feet

Calendar Year

0

500

1,000

1,500

2,000

2,500

3,000

20142013201220112010200920082007200620052004

Num

ber o

f Res

iden

tial U

nits

or H

otel

Roo

ms

Calendar Year

Office (GFA) Retail (GFA) Other (GFA)

Residential - Multifamily (Units)* Hotel (Rooms)Residential - Single Family (Units)

Residential Unit and Hotel Room Construction Starts by Year (2004-2014)

Office, Retail, and Other Space Construction Starts by Year (2004-2014)

Construction Starts Summary for 2014

Construction Starts Office (GFA) Retail (GFA) Other (GFA)Residential: Total

(Units)

Residential: Multifamily

(Units)*

Residential: Single Family

(Units) Hotel Rooms

2014 Amount 0 60,370 354,295 1,253 1,105 148 0

10 Year Annual Avg. 502,484 102,392 207,235

1,561 1,424 136 128

(2004-2013)

*The Multifamily residential unit subtotal includes high rise buildings, garden style buildings, townhouses, and duplexes.

4

Construction Starts - Site Plans

• Rosslyn Key - Townhouses (SP #412)• Metropolitan Park IV/V (SP #105)• Verde Pointe (SP #420)• Ballston Row (SP #405)

Construction Starts - By-Right

• Shreve Site Self Storage• Self Storage (near Nauck)• Westover Place

Construction Starts - Form Based Code

• The Shell• Pike 3400 Townhouses

Construction Starts - Use Permit

• Ashlawn Elementary School Addtion• Discovery Elementary School

Detailed project information is available on page 5 and in the tables attached to the end of this report.

Office

Other

Retail

10 Year Average(2004-2013)

Multifamily

Hotel

10 Year Average(2004-2013)

Single Family

Page 5: Annual Development Highlights 2014 · Annual Development Highlights 2014 Community Planning, Housing & Development January 1, 2014 - December 31, 2014 roduced by the Department of

Development Tracking Report Third Quarter 2012Annual Development Highlights 2014

This section displays construction starts, those projects which have started construction, for all development types in 2014. Single Family Home projects are defined as starting construction when their building permits are issued. All major projects are defined as starting construction when their building permits are issued and when construction activity proceeds above grade.

Major projects that Started Construction in 2014

Defining Construction Starts

Development Name Area Site Plan Number Office (GFA) Retail (GFA) Other (GFA)Residential

UnitsHotel

Rooms

Rosslyn-Ballston Corridor

Rosslyn Key - Townhouses Rosslyn 412 0 0 0 25 0

Rosslyn-Ballston Corridor Subtotal - - 0 0 0 25 0

Jefferson Davis Corridor

Metropolitan Park IV/V Pentagon City 105 0 40,413 0 699 0

Jefferson Davis Corridor Subtotal - - 0 40,413 0 699 0

Columbia Pike Corridor

The Shell Columbia Pike FBC 0 6,700 0 83 0

Pike 3400 (Townhouse Only - South Block) Columbia Pike FBC/UP 0 0 0 44 0

Columbia Pike Corridor Subtotal - - 0 6,700 0 127 0

Other AreasShreve Site Self Storage East Falls Church B/R 0 0 107,980 0 0

Verde Pointe (Bergmann's) Lee Highway 420 0 13,257 0 202 0

Ashlawn Elementary School Addition Other Area UP 0 0 26,160 0 0

Discovery Elementary School Other Area UP 0 0 96,805 0 0

Self Storage Other Area B/R 0 0 123,350 0 0

Ballston Row (Buckingham Village II) Other Area 405 0 0 0 32 0

Westover Place Other Area B/R 0 0 0 20 0

Single Family Homes: Countywide* - - 0 0 0 170 0

Arlington County Total** - - 0 60,370 354,295 1,253 0

*This table tabulates all Single Family Homes Countywide and does not include Single Family Homes in the Corridor Subtotals. For Single Family Homes within the Major Planning Areas and Other Planning Areas, refer to the attached tables.

5

Multifamily

**Subtotals will not add to the Arlington County total, as this table does not display all projects that started construction. For a full list refer to the attached tables.

SP #105: Metropolitan Park IV/V SP #420: Verde Pointe

Ashlawn Elementary SchoolAddition

FBC Project: The Shell

Page 6: Annual Development Highlights 2014 · Annual Development Highlights 2014 Community Planning, Housing & Development January 1, 2014 - December 31, 2014 roduced by the Department of

Development Tracking Report Third Quarter 2012Annual Development Highlights 2014

Completions

0

0.25

0.5

0.75

1.0

1.25

1.5

20142013201220112010200920082007200620052004

GFA

in m

illio

ns o

f Squ

are

Feet

Calendar Year

0

500

1,000

1,500

2,000

2,500

3,000

3,500

20142013201220112010200920082007200620052004

Num

ber o

f Res

iden

tial U

nits

or H

otel

Roo

ms

Calendar Year

Office (GFA) Retail (GFA) Other (GFA)

Residential - Multifamily (Units) Hotel (Rooms)Residential - Single Family (Units)

Residential Unit and Hotel Room Completions by Year (2004-2014)

Office, Retail, and Other Space Completions by Year (2004-2014)

Completions Summary for 2014

Completions Office (GFA) Retail (GFA) Other (GFA)Residential: Total

(Units)

Residential: Multifamily

(Units)*

Residential: Single Family

(Units) Hotel Rooms

2013 Amount 616,770 87,007 38,884 1,539 1,376 163 0

10 Year Annual Avg. 567,648 107,789 270,282

1,471 1,334 141 162

(2004-2013)

*The Multifamily residential unit subtotal includes high rise buildings, garden style bulidings, townhouses, and duplexes.6

Completions - Site Plan

• 2001 Clarendon Apts. (SP #389)• The Tellus (SP #403)• Beacon at Clarendon West (SP #392)• 3001 Washington Blvd. (SP #418)• The View (SP #413)• Boeing Site (Phase I) (SP #400)

Completions - By-Right

• Archstone Parkland Gardens

Completions - Use Permit

• Ashlawn Element School Addition

Completions - Form Based Code

• Arlington Mill (Residential)

Detailed project information is available on page 7 and in the tables attached to the end of this report.

Office

OtherRetail

10 Year Average(2004-2013)

Multifamily

Hotel

10 Year Average(2004-2013)

Single Family

Page 7: Annual Development Highlights 2014 · Annual Development Highlights 2014 Community Planning, Housing & Development January 1, 2014 - December 31, 2014 roduced by the Department of

Development Tracking Report Third Quarter 2012Annual Development Highlights 2014

Development Name AreaSite Plan Number

Office (GFA)

Retail (GFA)

Other (GFA)

Residential Units

Hotel Rooms

Rosslyn-Ballston Corridor2001 Clarendon Apartments Courthouse 389 0 32,840 0 154 0

The Tellus Courthouse 403 10,674 4,354 0 254 0

Beacon at Clarendon West Clarendon 392 0 18,299 0 195 0

3001 Washington Blvd (Penzance) Clarendon 418 284,012 22,479 0 0 0

905 N Jackson St Clarendon B-R 0 0 0 13 0

ARC 3409 (use conversion: hotel to residential condo) Virginia Square 377 0 0 0 87 0

The View (Founder's Square - North Residential) Ballston 413 0 9,035 0 256 0

Ballston Green Ballston 401 0 0 0 28 0

Rosslyn-Ballston Corridor Subtotal* - - 294,686 87,007 0 987 0

Jefferson Davis Corridor

Boeing Site - Phase I Crystal City 400 322,084 0 0 0 0

Jefferson Davis Corridor Subtotal* - - 322,084 0 0 0 0

Columbia Pike Corridor

Arlington Mill (Residential) Columbia Pike FBC/UP 0 0 0 122 0

Columbia Pike Corridor Subtotal* - - 0 0 0 122 0

Other Areas

Archstone Parkland Gardens Lee Highway B-R 0 0 0 227 0

Buckingham Townhomes (Village I) Other Areas 405 0 0 0 36 0

Ashlawn Elementary School Addition Other Areas UP 0 0 26,160 0 0

Single Family Homes: Countywide* - - 0 0 0 163 0

Arlington County Total** - - 616,700 87,007 38,884 1,539 0

SP #413: The ViewSP #403: The Tellus SP #418: 3001 Washington Blvd. SP #400: Boeing Site (Phase I)

This section displays completions for all development types in 2014. Single Family Home and other minor projects are defined as complete when they receive their Master Certificate of Occupancy Permit. Major projects are defined as complete when the certificate of occupancy permits have been issued for at least 50 percent of the project’s total GFA or number of residential units.

Defining Completions

*This table tabulates all Single Family Homes Countywide and does not include Single Family Homes in the Corridor Subtotals. For Single Family Homes within the Major Planning Areas and Other Planning Areas, refer to the attached tables.

7

Multifamily

Major projects that were Completed in 2014

**Subtotals will not add to the Arlington County total, as this table does not display all projects that started construction. For a full list refer to the attached tables.

Page 8: Annual Development Highlights 2014 · Annual Development Highlights 2014 Community Planning, Housing & Development January 1, 2014 - December 31, 2014 roduced by the Department of

Development Tracking Report Third Quarter 2012Annual Development Highlights 2014

0

50100150200250300350400

20142013201220112010200920082007200620052004

GFA

in th

ousa

nds

of S

quar

e Fe

et

Calendar Year

0

50100150200250300350400

20142013201220112010200920082007200620052004

Num

ber o

f Res

iden

tial U

nits

or H

otel

Roo

ms

Calendar Year

Residential Unit and Hotel Room Demolitions by Year (2004-2014)

Office, Retail, and Other Space Demolitions by Year (2004-2014)

Office (GFA) Retail (GFA) Other (GFA)

Residential - Multifamily (Units)* Hotel (Rooms)Residential - Single Family (Units)

Demolitions Summary for 2014

Demolitions

Demolitions Office (GFA) Retail (GFA) Other (GFA)Residential: Total

(Units)

Residential: Multifamily

(Units)*

Residential: Single Family

(Units) Hotel Rooms

2014 Amount 59,737 80,232 44,444 173 30 143 0

10 Year Annual Avg. 114,009 59,837 110,585 241 127 114 55

(2004-2013)

Demolitions - For Site Plan Projects

• Pierce/Queen Apartments (SP #425)• Wheeler-Lynn buliding and McDonald’s

for Central Place (SP #103)• Demolitions for 2311 Wilson (SP #263)

and 2401 Wilson (SP #404)• Demolitions for the Latitude (SP #426)• Crystal City Post Office (SP #424)

Demolitions - For By-Right Projects

• Garden style apartment demolition for Westover Place

• Demolition for Self Storage facilities in Four Mile Run and East Falls Church.

*The Multifamily residential unit subtotal includes high rise buildings, garden style buildings, townhouses, and duplexes.

8

Demolitions - For Form Based Code Projects

• Columbia Pike Shell (for FBC project ‘The Shell’)

• 1038 S Highland St (for FBC project Axumite Village

Detailed project information is available on page 9 and in the tables attached to the end of this report.

Office

OtherRetail

10 Year Average(2004-2013)

Multifamily

Hotel

10 Year Average(2004-2013)

Single Family

**While there was no private office demolition in 2013, the Navy Annex (a federally owned building) was demolished in 1Q2013. This shows only privately owned or County owned development.

Page 9: Annual Development Highlights 2014 · Annual Development Highlights 2014 Community Planning, Housing & Development January 1, 2014 - December 31, 2014 roduced by the Department of

Development Tracking Report Third Quarter 2012Annual Development Highlights 2014

Development Name Area Site Plan Number

Office (GFA)

Retail (GFA)

Other (GFA)

Residential Units

Hotel Rooms

Rosslyn-Ballston Corridor

Pierce Queen Apartments (for Union on Queen) Rosslyn - 0 0 0 10 0

Wheeler-Lynn Bldg. (for Central Place) Rosslyn 103 45,523 0 0 0 0

McDonald's (for Central Place) Rosslyn - 0 11,862 0 0 0

2 story office (for 2311 Wilson) Courthouse - 1,722 0 0 0 0

Derand Realty/A&M Concepts Company (for 2311 Wilson) Courthouse - 2,704 2,704 0 0 0

Palladio's Cafe/Mr. Hibachi (for 2311 Wilson) Courthouse - 2,308 2,308 0 0 0

South Eastern Printing (for 2401 Wilson) Courthouse - 0 4,010 0 0 0

Southeastern Printing (for 2401 Wilson) Courthouse - 0 6,435 0 0 0

3601 N Fairfax Dr. (for Latitude) Virginia Square - 7,480 7,480 0 0 0

Bank of America (for Latitude) Virginia Square - 0 3,472 0 0 0

Rosslyn-Ballston Corridor Subtotal - - 59,737 38,271 0 10 0

Jefferson Davis CorridorEads Post Office (for SP 424) Crystal City - 0 8,215 0 0 0

Jefferson Davis Corridor Subtotal - - 0 8,215 0 0 0

Other Areas2631 Shirlington Rd Other Area - 0 0 40,000 0 0

Shreve's Oil Co East Falls Church - 0 0 4,444 0 0

Bergmann's Dry Cleaners (for Bergmann's) Lee Highway - 0 33,746 0 0 0

Single Family Homes: Countywide* - - 0 0 0 143 0

Arlington County Totals - - 59,737 80,232 44,444 173 0

This section displays demolitions for all development types in 2014. All projects are defined as demolished when they receive their demolition permit.

Defining Demolitions

*This table tabulates all Single Family Homes Countywide and does not include Single Family Homes in the Corridor Subtotals. For Single Family Homes within the Major Planning Areas and

9

Multifamily

Major projects that were Demolished in 2014

**While there was no private office demolition in 2013, the Navy Annex (a federally owned building) was demolished in 1Q2013. This shows only privately owned or County owned development.

Page 10: Annual Development Highlights 2014 · Annual Development Highlights 2014 Community Planning, Housing & Development January 1, 2014 - December 31, 2014 roduced by the Department of

Development Tracking Report Third Quarter 2012Annual Development Highlights 2014

In addition to this summary, detailed tables showing completions, construction starts, approvals, and demolitions for residential units, office space, retail space, hotel rooms, and other space for calendar year 2014 accompany this document.

The attached tables are divided into four sections: • Site Plan and other Approved Projects• Completed Projects• Projects Under Construction• Demolitions

Each section separately reports Major Projects and Single Family Houses. Data are reported for each of Arlington’s Major Planning Areas and Other Planning Areas. Major Planning Areas include Rosslyn, Courthouse, Clarendon, Virginia Square, Ballston, Crystal City, Pentagon City, and Columbia Pike. Other Planning Areas include Nauck, Shirlington, East Falls Church, Lee Highway, and Four Mile Run.

Interactive maps, pictures of development projects, and additional information are available at http://projects.arlingtonva.us/data-research/ .

Data Table Overview

Online Data and Mapping Resources

A map and pictures of development projects are available on the web at <http://projects.arlingtonva.us/data-research/>

Maps are provided through Arlington County’s GIS mapping application, which allows users to view the location of development activity and click on individual development projects to get detailed data.

10

About the Center for Urban Design and Research

The Center for Urban Design and Research is part of the Arlington County Planning Division and is responsible for facilitating community education and engagement, advocating urban design and placemaking, and developing strategies and plans for improving the urban environment and public realm, and maintaining, analyzing, and disseminating information related to planning development and demographics.

If you have any questions or would like additional information, please contact the Center for Urban Design and Research at (703) 228-3525.

Department of Community Planning, Housing and DevelopmentPlanning Division

Center for Urban Design and Research(703) 228-3525

Page 11: Annual Development Highlights 2014 · Annual Development Highlights 2014 Community Planning, Housing & Development January 1, 2014 - December 31, 2014 roduced by the Department of

Summary of Site Plan and Other ProjectsArlington County, Virginia

Approved (Not Under Construction) As Of 12/31/2014

Office Retail Residential Hotel

(s.f.) (s.f.) Units Rooms

Other*(s.f.) Number**

Site PlanApprovalProject Name Address Date

ROSSLYN

55,540 274 0 06/14/20141401 Wilson Blvd 0 4291401 WILSON BLVD 513,004

0 0 168 06/15/2013Colony House 0 4231700 LEE HIGHWAY 0

0 193 0 03/11/2013Union on Queen 0 4251520 N PIERCE ST 0

8,688 0 0 07/21/2012Rosslyn Gateway PDSP - FSP (Phase 1 - Office Building)

0 4191901 FT MYER DR 490,056

10,001 133 148 07/21/2012Rosslyn Gateway PDSP - FSP (Phase 1 - Residential/Hotel Building)

0 4191901 Ft MYER DR 0

7,687 140 0 07/21/2012Rosslyn Gateway PDSP (Phase 2 - Remaining Allocation)

0 4191901 FT MYER DR 0

10,979 0 0 05/05/2007Central Place (Office) 9,072 3351213 WILSON BLVD 570,549

33,575 374 0 05/05/2007Central Place (Residential) 0 3351801 N MOORE ST 0

0 37 0 02/02/2007Gaslight Square Phase III 0 B/R1701 16th ST N 0

1,573,609 126,470 1,151 3169,072ROSSLYN SUBTOTAL

COURT HOUSE

1,280 0 161 03/15/20142401 Wilson Blvd 0 4042401 WILSON BLVD 0

14,025 0 0 12/08/20122311 Wilson Blvd 8,800 2632311 WILSON BLVD 149,553

0 188 0 10/15/2011Wakefield Manor 0 4172025 FAIRFAX DR 0

10,000 0 0 11/15/2005NSTA Office Site Plan 0 3821840 WILSON BLVD 107,920

257,473 25,305 188 1618,800COURT HOUSE SUBTOTAL

CLARENDON

3,660 144 0 07/19/201410th Street Flats 0 UCMUD3132 10TH ST N 4,704

4,704 3,660 144 00CLARENDON SUBTOTAL

VIRGINIA SQUARE

3,115 265 0 11/16/2013Latitude Apartments 2,802 4263601 FAIRFAX DRIVE 0

3,200 0 0 01/21/20123901 Fairfax Drive 12,985 3863901 FAIRFAX DR 178,131

0 0 0 01/27/19993803 Fairfax Drive Expansion 0 1963803 FAIRFAX DR 43,045

11,000 0 0 01/01/1994George Mason University - Phase III

183,000

Sp. Ag.3401 FAIRFAX DR 90,000

311,176 17,315 265 0198,787VIRGINIA SQUARE SUBTOTAL

BALLSTON

0 104 0 01/25/2014The Springs 0 4304318 N CARLIN SPRINGS RD

5,630

Page 1 of 3Summary of Site Plan and Other Projects Approved (Not Under Construction) As Of 12/31/2014

Page 12: Annual Development Highlights 2014 · Annual Development Highlights 2014 Community Planning, Housing & Development January 1, 2014 - December 31, 2014 roduced by the Department of

Office Retail Residential Hotel

(s.f.) (s.f.) Units Rooms

Other*(s.f.) Number**

Site PlanApprovalProject Name Address Date

3,000 267 0 01/15/2014Marymount University 0 641000 N GLEBE RD 165,204

0 2 0 12/14/2013Row Homes at Ballston 0 4154210 WASHINGTON BLVD

0

7,670 0 0 07/19/20084040 Wilson Blvd (Founder's Square - North Office)

0 413707 N RANDOLPH 418,810

9,200 237 0 01/21/2006The Spire/Fairmont 0 3314420 FAIRFAX DR 0

589,644 19,870 610 00BALLSTON SUBTOTAL

CRYSTAL CITY

5,848 252 0 07/19/2014WeLive (Crystal Plaza VI Conversion)

0 112221 S CLARK ST 0

0 0 0 03/16/2013Long Bridge Park Aquatics and Fitness Facility (Phase I)

120,420

UP333 Long Bridge Dr 0

0 198 0 02/23/20131720 S. Eads St. 0 4241720 S EADS ST 0

11,290 0 0 09/15/20121900 Crystal Drive 0 4211900 CRYSTAL DRIVE

719,704

0 0 0 10/15/2011Boeing Site - Phase II 0 400608 S BALL ST 131,338

41,325 0 0 12/18/2007Potomac Yard - Land Bay C (National Gateway 3-4-5-6)

0 346JEFFERSON DAVIS HWY

1,064,298

15,868 331 0 04/21/2007Potomac Yard - Land Bay D - West (Brittany West)

0 3463001 JEFFERSON DAVIS HWY

0

16,503 360 0 04/21/2007Potomac Yard - Land Bay D-East (Brittany East)

0 346JEFFERSON DAVIS HWY

0

0 252 0 11/14/2006Lofts at Crystal Houses 0 131900 S EADS ST 0

0 198 0 01/01/1981Airport Plaza IV 0 1452600 CRYSTAL DR 0

1,915,340 90,834 1,591 0120,420CRYSTAL CITY SUBTOTAL

PENTAGON CITY

50,965 0 0 11/16/2013Fashion Center Mall Expansion

0 1051200 S HAYES ST 0

50,000 0 300 09/21/2013PenPlace (Pentagon City PDSP Parcel 1D - Remaining Allocation)

0 1051197 S FERN ST 1,809,000

23,818 1403 0 09/21/2013Pentagon City PDSP (Parcel 3/Metropolitan Park - Remaining Allocation)

0 1051400 S EADS S 0

33,495 0 0 07/21/2008Pentagon Centre PDSP - Phase I (FSP)

0 2971201 S HAYES 489,911

293,575

600 250 07/21/2008Pentagon Centre PDSP - Phase II and III (Remaining Allocation)

0 2971201 S HAYES 287,071

2,585,982 451,853 2,003 5500PENTAGON CITY SUBTOTAL

COLUMBIA PIKE

8,000 73 0 12/19/20144707 Columbia Pike 0 FBC4707 COLUMBIA PIKE

0

0 36 0 07/11/2009Axumite Village 0 FBC/UP1100 S HIGHLAND ST 0

0 8,000 109 00COLUMBIA PIKE SUBTOTAL

LEE HIGHWAY

12,200 22 0 07/08/20062515 Lee Hwy 0 UCMUD2515 LEE HWY 0

Page 2 of 3Summary of Site Plan and Other Projects Approved (Not Under Construction) As Of 12/31/2014

Page 13: Annual Development Highlights 2014 · Annual Development Highlights 2014 Community Planning, Housing & Development January 1, 2014 - December 31, 2014 roduced by the Department of

Office Retail Residential Hotel

(s.f.) (s.f.) Units Rooms

Other*(s.f.) Number**

Site PlanApprovalProject Name Address Date

5,570 12 0 02/25/20064601-4607 Old Dominion Dr 0 UCMUD4601 OLD DOMINION DR

6,272

6,272 17,770 34 00LEE HIGHWAY SUBTOTAL

OUTSIDE METRO

0 0 0 09/20/2014McKinley Elementary School Addition

32,250 UP1030 MCKINLEY RD 0

0 0 0 04/20/20133838 N Cathedral Lane 0 4283838 N CATHEDRAL LN

4,590

4,590 0 0 032,250OUTSIDE METRO SUBTOTAL

7,248,790 761,077 6,095 1,027369,329 SUBTOTAL

SINGLE-FAMILY HOUSES

COURT HOUSE

0 4 0 03/15/2014URD associated with SP 404 0 URD2404 16TH ST N 0

0 0 4 00COURT HOUSE SUBTOTAL

LEE HIGHWAY

0 4 0 10/01/2009Greenbrier Village Phase II 0 B/R2251 N GREENBRIER ST

0

0 0 4 00LEE HIGHWAY SUBTOTAL

OUTSIDE METRO

0 3 0 02/22/2014Honeysuckle Hills URD 0 URD6122 LEE HIGHWAY 0

0 2 0 01/26/2008705/707 N Barton St 0 URD705 N BARTON ST 0

0 0 5 00OUTSIDE METRO SUBTOTAL

0 0 13 00SINGLE-FAMILY HOUSES SUBTOTAL

7,248,790 761,077 6,108 1,027ARLINGTON TOTAL 369,329

* Includes schools, health care facilities, recreation centers, fire houses, etc.

** Numbers listed refer to the site plan number. Other codes are as follows: B-R = By-right; FBC = Formed Based Code; PROF = Proffer; UP = Use Permit; URD = Unified Residential Development; UCMUD = Unified Commercial Mixed Use Development; and Sp. Ag. = Special Agreement.

Page 3 of 3Summary of Site Plan and Other Projects Approved (Not Under Construction) As Of 12/31/2014

Page 14: Annual Development Highlights 2014 · Annual Development Highlights 2014 Community Planning, Housing & Development January 1, 2014 - December 31, 2014 roduced by the Department of

Completed ProjectsArlington County, Virginia

01/01/2014 Through 12/31/2014

Office Retail Residential Hotel

(s.f.) (s.f.) Units Rooms

Other*(s.f.) Number**

Site PlanCompletionProject Name Address Date

COURT HOUSE

32,840 154 0 12/11/20142001 Clarendon Apartments 0 3892001 CLARENDON BLVD

0

4,354 254 0 09/29/2014The Tellus 0 4032009 14TH ST N 10,674

10,674 37,194 408 00COURT HOUSE SUBTOTAL

CLARENDON

0 13 0 11/04/2014905 N Jackson St 0 B-R905 N JACKSON ST 0

18,299 195 0 09/12/2014Beacon at Clarendon West 0 3921200 N IRVING ST 0

22,479 0 0 09/01/20143001 Washington Blvd (Penzance)

0 4183001 WASHINGTON BLVD

284,012

284,012 40,778 208 00CLARENDON SUBTOTAL

VIRGINIA SQUARE

0 87 0 10/01/2014ARC 3409 (previously AKA VA Square- use conversion)

0 3773409 Wilson BLVD 0

0 0 87 00VIRGINIA SQUARE SUBTOTAL

BALLSTON

9,035 256 0 04/03/2014The View (Founder's Square - North Residential)

0 4134000 WILSON BLVD 0

0 28 0 03/31/2014Ballston Green 0 401815 N WOODROW ST 0

0 9,035 284 00BALLSTON SUBTOTAL

CRYSTAL CITY

0 0 0 12/23/2014Boeing Site - Phase I 0 400608 S BALL ST 322,084

322,084 0 0 00CRYSTAL CITY SUBTOTAL

COLUMBIA PIKE

0 122 0 02/28/2014Arlington Mill (Residential) 0 FBC/UP4975 COLUMBIA PIKE

0

0 0 122 00COLUMBIA PIKE SUBTOTAL

LEE HIGHWAY

0 227 0 04/30/2014Archstone Parkland Gardens 0 B-R2109 N Glebe Rd 0

0 0 227 00LEE HIGHWAY SUBTOTAL

Page 1 of 7Completed Projects 01/01/2014 Through 12/31/2014

Page 15: Annual Development Highlights 2014 · Annual Development Highlights 2014 Community Planning, Housing & Development January 1, 2014 - December 31, 2014 roduced by the Department of

Office Retail Residential Hotel

(s.f.) (s.f.) Units Rooms

Other*(s.f.) Number**

Site PlanCompletionProject Name Address Date

NAUCK

0 1 0 02/18/20142100 Shirlington Rd 02100 SHIRLINGTON RD

0

0 1 0 02/18/20142102 Shirlington Rd 02102 SHIRLINGTON RD

0

0 0 2 00NAUCK SUBTOTAL

OUTSIDE METRO

0 0 0 09/18/2014Anglican Church 12,7241815 N QUINCY ST 0

0 0 0 08/26/2014Ashlawn Elementary School Addition

26,160 UP5950 8th Rd N 0

0 1 0 07/28/20143511 22nd St S 03511 22ND ST S 0

0 1 0 07/28/20143513 22nd St S 03513 22ND ST S 0

0 36 0 06/19/2014Buckingham Townhomes (Village I)

0 405424 N GEORGE MASON DR

0

0 0 38 038,884OUTSIDE METRO SUBTOTAL

616,770 87,007 1,376 038,884 SUBTOTAL

SINGLE-FAMILY HOUSES

COURT HOUSE

0 1 0 12/31/20142511 16th St N 02511 16TH ST N 0

0 1 0 10/06/20141709 N Adams St 01709 N ADAMS 0

0 0 2 00COURT HOUSE SUBTOTAL

CLARENDON

0 1 0 07/23/20141609 N Garfield St 01609 N GARFIELD ST

0

0 1 0 07/07/20141607 N Garfield St 01607 N GARFIELD ST

0

0 1 0 03/19/20141305 N Herndon St 01305 N HERNDON ST 0

0 0 3 00CLARENDON SUBTOTAL

VIRGINIA SQUARE

0 1 0 12/03/20143409 Wilson Blvd 03409 WILSON BLVD 0

0 0 1 00VIRGINIA SQUARE SUBTOTAL

BALLSTON

0 1 0 09/19/2014612 N Abingdon St 0612 N ABINGDON ST 0

0 1 0 06/26/2014738 N Buchanan St 0738 N BUCHANAN ST 0

0 1 0 06/17/2014500 N Abingdon St 0500 N ABINGDON ST 0

0 0 3 00BALLSTON SUBTOTAL

COLUMBIA PIKE

0 1 0 09/28/2014600 S Monroe St 0600 S MONROE ST 0

0 1 0 08/29/2014610 S Monroe St 0610 S MONROE ST 0

Page 2 of 7Completed Projects 01/01/2014 Through 12/31/2014

Page 16: Annual Development Highlights 2014 · Annual Development Highlights 2014 Community Planning, Housing & Development January 1, 2014 - December 31, 2014 roduced by the Department of

Office Retail Residential Hotel

(s.f.) (s.f.) Units Rooms

Other*(s.f.) Number**

Site PlanCompletionProject Name Address Date

0 1 0 06/20/20143709 9th St S 03709 9TH ST S 0

0 1 0 06/10/2014903 S Quincy St 0903 S QUINCY ST 0

0 1 0 05/30/20143705 9th St S 03705 9TH ST S 0

0 1 0 05/30/2014905 S Quincy St 0905 S QUINCY ST 0

0 1 0 04/29/2014909 S Quincy St 0909 S QUINCY ST 0

0 1 0 02/25/20143127 13th St S 03127 13TH ST S 0

0 0 8 00COLUMBIA PIKE SUBTOTAL

LEE HIGHWAY

0 1 0 09/26/20142205 20th St N 02205 20TH ST N 0

0 1 0 09/17/20142009 N Nelson St 02009 N NELSON ST 0

0 1 0 02/26/20142324 N Columbus St 02324 N COLUMBUS ST

0

0 0 3 00LEE HIGHWAY SUBTOTAL

NAUCK

0 1 0 03/20/20142451 S Kenwood St 02451 S KENWOOD ST

0

0 1 0 03/20/20142453 S Kenwood St 02453 S KENWOOD ST

0

0 0 2 00NAUCK SUBTOTAL

OUTSIDE METRO

0 1 0 12/29/20142808 N Underwood St 02808 N UNDERWOOD ST

0

0 1 0 12/26/20142450 N Lexington St 02450 N LEXINGTON ST

0

0 1 0 12/23/20141522 N Taylor St 01522 N TAYLOR ST

0

0 1 0 12/23/20141810 N Cleveland St 01810 N CLEVELAND ST

0

0 1 0 12/23/20144907 33rd Rd N 04907 33RD RD N 0

0 1 0 12/22/20142619 N Powhatan St 02619 N POWHATAN ST

0

0 1 0 12/17/20142026 N Taylor St 02026 N TAYLOR ST

0

0 1 0 12/16/20141726 N Adams St 01726 N ADAMS ST 0

0 1 0 12/16/20144519 25th Rd N 04519 25TH RD N 0

0 1 0 12/16/20144521 25th Rd N 04521 25TH RD N 0

0 1 0 12/15/20142604 3rd St N 02604 3RD ST N 0

0 1 0 12/15/20144909 34th St N 04909 34TH ST N 0

0 1 0 12/12/20142830 N Sycamore St 02830 N SYCAMORE ST

0

0 1 0 12/12/20143101 N Peary St 03101 N PEARY ST 0

0 1 0 12/12/20145215 31st Rd N 05215 31ST RD N 0

0 1 0 12/11/20141314 N Stafford St 01314 N STAFFORD ST

0

0 1 0 12/10/20144819 15th St N 04819 15TH ST N 0

0 1 0 12/08/20146017 28th St N 06017 28TH ST N 0

0 1 0 12/08/20146305 15th Rd N 06305 15TH RD N 0

0 1 0 12/04/20142527 N Vermont St 02527 N VERMONT ST 0

0 1 0 12/04/20144631 23Rd St N 04631 23RD ST N 0

Page 3 of 7Completed Projects 01/01/2014 Through 12/31/2014

Page 17: Annual Development Highlights 2014 · Annual Development Highlights 2014 Community Planning, Housing & Development January 1, 2014 - December 31, 2014 roduced by the Department of

Office Retail Residential Hotel

(s.f.) (s.f.) Units Rooms

Other*(s.f.) Number**

Site PlanCompletionProject Name Address Date

0 1 0 12/04/20145808 22Nd St N 05808 22ND ST N 0

0 1 0 11/26/20146531 Williamsburg Blvd 06531 WILLIAMSBURG BLVD

0

0 1 0 11/25/20141001 N Kensington St 01001 N KENSINGTON ST

0

0 1 0 11/25/20145113 Yorktown Blvd 05113 YORKTOWN BLVD

0

0 1 0 11/21/20141900 N Illinois St 01900 N ILLINOIS ST 0

0 1 0 11/21/20145734 8th St N 05734 8TH ST N 0

0 1 0 11/21/20146109 26th St N 06109 26TH ST N 0

0 1 0 11/21/2014904 N Cleveland St 0904 N CLEVELAND ST

0

0 1 0 11/21/2014908 N Cleveland St 0908 N CLEVELAND ST

0

0 1 0 11/20/20141126 N Illinois St 01126 N ILLINOIS ST 0

0 1 0 11/18/20142346 N Fillmore St 02346 N FILLMORE ST 0

0 1 0 11/14/20143609 N Potomac St 03609 N POTOMAC ST 0

0 1 0 11/12/20146057 25th Rd N 06057 25TH RD N 0

0 1 0 11/07/20141130 N Illinois St 01130 N ILLINOIS ST 0

0 1 0 11/07/20146815 30th Rd N 06815 30TH RD N 0

0 1 0 11/05/20142244 24th St N 02244 24TH ST N 0

0 1 0 11/05/20142248 24th St N 02248 24TH ST N 0

0 1 0 11/04/20143710 Military Rd 03710 MILITARY RD 0

0 1 0 11/04/20144124 N Richmond St 04124 N RICHMOND ST

0

0 1 0 11/04/20145101 25th Pl N 05101 25TH PL N 0

0 1 0 11/03/20142757 N Quebec St 02757 N QUEBEC ST 0

0 1 0 10/31/20142724 N Nelson St 02724 N NELSON ST

0

0 1 0 10/31/20144834 33rd Rd N 04834 33RD RD N 0

0 1 0 10/28/20141119 N Harrison St 01119 N HARRISON ST

0

0 1 0 10/23/20143011 N Trinidad St 03011 N TRINIDAD ST 0

0 1 0 10/21/20146620 32nd St N 06620 32ND ST N 0

0 1 0 10/16/20142753 N Quebec St 02753 N QUEBEC ST 0

0 1 0 10/13/20142511 S Fern St 02511 S FERN ST 0

0 1 0 10/13/20142515 S Fern St 02515 S FERN ST 0

0 1 0 10/09/20141601 N Taylor St 01601 N TAYLOR ST 0

0 1 0 10/08/20142008 N Jefferson St 02008 N JEFFERSON ST

0

0 1 0 10/06/20141827 N Lexington St 01827 N LEXINGTON ST

0

0 1 0 10/06/20143018 N Trinidata St 03018 N TRINIDAD ST

0

0 1 0 10/06/20145720 18th Rd N 05720 18TH RD N 0

0 1 0 10/02/20145040 36th St N 05040 36TH ST N 0

0 1 0 10/01/20141507 N Buchanan St 01507 N BUCHANAN ST

0

0 1 0 09/30/20144612 23rd St N 04612 23RD ST N 0

0 1 0 09/30/20144957 Rock Spring Rd 04957 ROCK SPRING RD

0

0 1 0 09/26/20145812 37th St N 05812 37TH ST N 0

0 1 0 09/25/20141906 N Nottingham St 01906 N NOTTINGHAM ST

0

0 1 0 09/23/2014812 21st St S 0812 21ST ST S 0

Page 4 of 7Completed Projects 01/01/2014 Through 12/31/2014

Page 18: Annual Development Highlights 2014 · Annual Development Highlights 2014 Community Planning, Housing & Development January 1, 2014 - December 31, 2014 roduced by the Department of

Office Retail Residential Hotel

(s.f.) (s.f.) Units Rooms

Other*(s.f.) Number**

Site PlanCompletionProject Name Address Date

0 1 0 09/18/20141314 N Jackson St 01314 N JACKSON ST 0

0 1 0 09/17/20142324 N Quebec St 02324 N QUEBEC ST

0

0 1 0 09/12/20143164 17th St N 03164 17TH ST N 0

0 1 0 09/12/20146106 30th St N 06106 30TH ST N 0

0 1 0 09/11/20142735 Lorcom Ln 02735 LORCOM LN 0

0 1 0 09/08/20141504 N Johnson St 0 URD1504 N JOHNSON ST

0

0 1 0 09/04/20141310 N Stafford St 01310 N STAFFORD ST

0

0 1 0 08/12/20141920 N Quincy St 01920 N QUINCY ST 0

0 1 0 08/08/20145612 32nd St N 05612 32ND ST N 0

0 1 0 08/07/20142629 N Pocomoke St 02629 N POCOMOKE ST

0

0 1 0 08/05/20142901 John Marshall Dr 02901 JOHN MARSHALL DR

0

0 1 0 07/29/20142614 N Rockingham St 02614 N ROCKINGHAM ST

0

0 1 0 07/28/20143515 22nd St S 03515 22ND ST S 0

0 1 0 07/17/20142307 N Trenton St 02307 N TRENTON ST 0

0 1 0 07/15/20145120 27th Rd N 05120 27TH RD N 0

0 1 0 07/14/20143125 N Nelson St 03125 N NELSON ST

0

0 1 0 07/10/20142904 Lorcom Ln 02904 LORCOM LN 0

0 1 0 07/09/20142144 N Pollard St 02144 N POLLARD ST

0

0 1 0 07/08/20145620 27th St N 05620 27TH ST N 0

0 1 0 07/07/20144611 23rd Rd N 04611 23RD RD N 0

0 1 0 07/06/2014853 N Jacksonville St 0853 N JACKSONVILLE ST

0

0 1 0 07/01/20142707 S June St 02707 S JUNE ST 0

0 1 0 07/01/20143446 N Emerson St 03446 N EMERSON ST 0

0 1 0 07/01/20145731 6th St N 05731 6TH ST N 0

0 1 0 06/24/20142369 N Dansville St 02369 N DANVILLE ST

0

0 1 0 06/24/20142813 John Marshall Dr 02813 JOHN MARSHALL DR

0

0 1 0 06/24/20144033 22nd St N 04033 22ND ST N 0

0 1 0 06/24/20144129 N Randolph St 04129 N RANDOLPH ST

0

0 1 0 06/19/20145624 34th St N 05624 34TH ST N 0

0 1 0 06/17/20142921 John Marshall Dr 02921 JOHN MARSHALL DR

0

0 1 0 06/17/20145643 6th St N 05643 6TH ST N 0

0 1 0 06/16/20144126 26th Rd N 04126 26th Rd N 0

0 1 0 06/13/20142403 N Columbus St 02403 N COLUMBUS ST

0

0 1 0 06/12/20144521 39th St N 04521 39TH ST N 0

0 1 0 06/10/20141808 S Nelson St 01808 S NELSON ST

0

0 1 0 06/02/2014634 21st St S 0634 21ST ST S 0

0 1 0 05/29/20142200 Military Rd 02200 MILITARY RD

0

0 1 0 05/27/20145237 19th St N 05237 19TH ST N 0

0 1 0 05/22/20141707 N Quebec St 01707 N QUEBEC ST 0

Page 5 of 7Completed Projects 01/01/2014 Through 12/31/2014

Page 19: Annual Development Highlights 2014 · Annual Development Highlights 2014 Community Planning, Housing & Development January 1, 2014 - December 31, 2014 roduced by the Department of

Office Retail Residential Hotel

(s.f.) (s.f.) Units Rooms

Other*(s.f.) Number**

Site PlanCompletionProject Name Address Date

0 1 0 05/14/20146119 Williamsburg Blvd 06119 WILLIAMSBURG BLVD

0

0 1 0 05/09/20144752 33rd St N 04752 33RD ST N 0

0 1 0 05/07/20143400 N George Mason Dr 03400 N GEORGE MASON DR

0

0 1 0 05/02/20142257 N Vernon St 02257 N VERNON ST 0

0 1 0 05/01/20142939 N Nottingham St 02939 N NOTTINGHAM ST

0

0 1 0 04/29/20142945 N Nottingham St 02945 N NOTTINGHAM ST

0

0 1 0 04/29/20146587 Little Falls Rd 06587 LITTLE FALLS RD

0

0 1 0 04/25/20142393 N Edgewood St 02393 N EDGEWOOD ST

0

0 1 0 04/24/20145832 20th St N 05832 20TH ST N 0

0 1 0 04/22/20141916 S Randolph St 01916 S RANDOLPH ST

0

0 1 0 04/21/20141307 N Utah St 01307 N UTAH ST 0

0 1 0 04/21/20145501 32nd St N 05501 32ND ST N 0

0 1 0 04/17/20143704 N Woodstock St 03704 N WOODSTOCK ST

0

0 1 0 04/14/20144909 16th Rd N 04909 16TH RD N 0

0 1 0 04/11/20142608 9th St N 02608 9TH ST N 0

0 1 0 04/07/20142603 3rd St N 02603 3RD ST N 0

0 1 0 03/31/20142522 N Upland St 02522 N UPLAND ST 0

0 1 0 03/28/20143033 N Pollard St 03033 N POLLARD ST 0

0 1 0 03/27/20146618 29th St N 06618 29TH ST N 0

0 1 0 03/26/20145370 37th St N 05370 37TH ST N 0

0 1 0 03/24/20143179 17th St N 03179 17TH ST N 0

0 1 0 03/14/20142607 3rd St N 02607 3RD ST N 0

0 1 0 03/14/20145033 35th St N 05033 35TH ST N 0

0 1 0 03/14/20146537 35th Rd N 06537 35TH RD N 0

0 1 0 03/12/20142228 S Kent St 02228 S KENT ST 0

0 1 0 03/11/20143815 N Nelson St 03815 N NELSON ST 0

0 1 0 03/05/201446 N Fenwick St 046 N FENWICK ST 0

0 1 0 02/21/20142803 2nd Rd N 02803 2ND RD N 0

0 1 0 02/19/20146250 22nd Rd N 06250 22ND RD N 0

0 1 0 02/12/20142616 N Ohio St 02616 N OHIO ST 0

0 1 0 02/10/20144613 15th St N 04613 15TH ST N 0

0 1 0 01/30/20144531 25th Rd N 04531 25TH RD N 0

0 1 0 01/29/20144535 25th Rd N 04535 25TH RD N 0

0 1 0 01/27/20143509 N Jefferson St 03509 N JEFFERSON ST

0

0 1 0 01/22/20142724 1st St S 02724 1ST ST S 0

0 1 0 01/21/20144551 32nd Rd N 04551 32ND RD N 0

0 1 0 01/10/20145105 26th Rd N 05105 26TH RD N 0

0 1 0 01/03/20143161 Key Blvd 03161 KEY BLVD 0

0 0 139 00OUTSIDE METRO SUBTOTAL

0 0 161 00SINGLE-FAMILY HOUSES SUBTOTAL

Page 6 of 7Completed Projects 01/01/2014 Through 12/31/2014

Page 20: Annual Development Highlights 2014 · Annual Development Highlights 2014 Community Planning, Housing & Development January 1, 2014 - December 31, 2014 roduced by the Department of

Office Retail Residential Hotel

(s.f.) (s.f.) Units Rooms

Other*(s.f.) Number**

Site PlanCompletionProject Name Address Date

616,770 87,007 1,537 0ARLINGTON TOTAL 38,884

* Includes schools, health care facilities, recreation centers, fire houses, etc.

** Numbers listed refer to the site plan number. Other codes are as follows: B-R = By-right; FBC = Formed Based Code; PROF = Proffer; UP = Use Permit; URD = Unified Residential Development; UCMUD = Unified Commercial Mixed Use Development; and Sp. Ag. = Special Agreement.

Page 7 of 7Completed Projects 01/01/2014 Through 12/31/2014

Page 21: Annual Development Highlights 2014 · Annual Development Highlights 2014 Community Planning, Housing & Development January 1, 2014 - December 31, 2014 roduced by the Department of

Projects Under ConstructionArlington County, Virginia

Through 12/31/2014

Office Retail Residential Hotel

(s.f.) (s.f.) Units Rooms

Other*(s.f.) Number**

Site PlanStartProject Name Address Date

ROSSLYN

0 25 0 10/10/2014Rosslyn Commons - Townhouses

0 4121500 CLARENDON BLVD

0

11,020 0 0 02/15/20121812 N Moore St 21,031 181812 N MOORE ST 569,739

569,739 11,020 25 021,031ROSSLYN SUBTOTAL

COURT HOUSE

24,657 198 0 10/19/201219 Nineteen (formerly 1919 Clarendon Boulevard and Hollywood Video Site)

0 4111919 CLARENDON BLVD

0

0 24,657 198 00COURT HOUSE SUBTOTAL

CLARENDON

0 18 0 11/20/2013The Hyde 0 B-R3119 9TH RD N 0

0 0 18 00CLARENDON SUBTOTAL

VIRGINIA SQUARE

12,815 534 0 02/01/2013Virginia Square Towers 0 4163440 FAIRFAX DR 0

0 12,815 534 00VIRGINIA SQUARE SUBTOTAL

BALLSTON

2,203 163 0 11/25/2013Maxwell Apartments 0 72650 N GLEBE RD 0

0 2,203 163 00BALLSTON SUBTOTAL

PENTAGON CITY

40,413 699 0 10/20/2014Pentagon City PDSP - FSP for Parcel 3 - Met Park 4 and 5

0 1051200 S EADS ST 0

16,350 411 0 11/01/2013The Acadia (Three Metropolitan Park)

0 1051201 S FERN ST 0

0 56,763 1,110 00PENTAGON CITY SUBTOTAL

COLUMBIA PIKE

0 44 0 09/28/2014Pike 3400 (Townhouse Only - South Block)

0 FBC/UP1100 S GLEBE RD 0

6,700 83 0 03/01/2014The Shell 0 FBC5511 COLUMBIA PIKE

0

Page 1 of 7Projects Under Construction Through 12/31/2014

Page 22: Annual Development Highlights 2014 · Annual Development Highlights 2014 Community Planning, Housing & Development January 1, 2014 - December 31, 2014 roduced by the Department of

Office Retail Residential Hotel

(s.f.) (s.f.) Units Rooms

Other*(s.f.) Number**

Site PlanStartProject Name Address Date

2,960 22 0 10/08/2013Columbia Place 0 FBC/UP1100 S EDGEWOOD ST

0

15,443 257 0 08/01/2013Pike 3400 (North Block) 0 FBC/UP3400 COLUMBIA PIKE

0

0 25,103 406 00COLUMBIA PIKE SUBTOTAL

LEE HIGHWAY

13,257 202 0 08/01/2014Verde Pointe (Bergmann's) 0 4202147 LEE HIGHWAY 0

0 13,257 202 00LEE HIGHWAY SUBTOTAL

EAST FALLS CHURCH

0 0 0 07/31/2014Shreve Site Self Storage 107,980

B/R6873 LEE HIGHWAY 0

0 0 0 0107,980EAST FALLS CHURCH SUBTOTAL

OUTSIDE METRO

0 0 0 09/01/2014Discovery Elementary School 96,805 UP3600 N HARRISON ST

0

0 20 0 08/12/2014Westover Place 0 B/R1005 N KENSINGTON ST

0

0 0 0 05/20/2014Self Storage 123,350

2631 SHIRLINGTON RD

0

0 32 0 05/08/2014Ballston Row (Buckingham Village II)

0 405310 N GEORGE MASON DRIVE

0

1,000 0 0 05/11/2011"Dentist" Site Plan 0 4146011 WILSON BLVD 0

0 1,000 52 0220,155OUTSIDE METRO SUBTOTAL

569,739 146,818 2,708 0349,166 SUBTOTAL

SINGLE-FAMILY HOUSES

COURT HOUSE

0 1 0 06/10/20142518 12th St N 02518 12TH ST N 0

0 1 0 04/04/20142122 19th St N 02122 19TH ST N 0

0 1 0 12/30/20132409 Clardendon Blvd 02409 CLARENDON BLVD

0

0 0 3 00COURT HOUSE SUBTOTAL

CLARENDON

0 1 0 10/09/20141512 N Garfield St 01512 N GARFIELD ST

0

0 1 0 10/09/20141514 N Garfield St 01514 N GARFIELD ST

0

0 1 0 10/06/20141405 N Herndon St 01405 N HERNDON ST

0

0 0 3 00CLARENDON SUBTOTAL

Page 2 of 7Projects Under Construction Through 12/31/2014

Page 23: Annual Development Highlights 2014 · Annual Development Highlights 2014 Community Planning, Housing & Development January 1, 2014 - December 31, 2014 roduced by the Department of

Office Retail Residential Hotel

(s.f.) (s.f.) Units Rooms

Other*(s.f.) Number**

Site PlanStartProject Name Address Date

VIRGINIA SQUARE

0 1 0 10/24/20143700 6th Rd N 03700 6TH RD N

0

0 0 1 00VIRGINIA SQUARE SUBTOTAL

COLUMBIA PIKE

0 1 0 10/15/20141210 S Walter Reed Dr 01210 S WALTER REED DR

0

0 1 0 10/15/20143000 12th St S 03000 12TH ST S

0

0 1 0 10/07/20143917 14th St S 03917 14TH ST S

0

0 1 0 03/10/20101102 S Queen St 01102 S QUEEN ST

0

0 1 0 05/30/20073507 16th St S 03507 16TH ST S

0

0 0 5 00COLUMBIA PIKE SUBTOTAL

LEE HIGHWAY

0 1 0 11/24/20145252 25thRd N 05252 25TH RD N

0

0 1 0 07/10/20141940 N Culpeper St 01940 N CULPEPER ST

0

0 1 0 02/05/20142006 N Culpeper St 02006 N CULPEPER ST

0

0 1 0 02/14/20132453 N Jefferson St 02453 N JEFFERSON ST

0

0 0 4 00LEE HIGHWAY SUBTOTAL

OUTSIDE METRO

0 1 0 12/19/20145217 27th Rd N 05217 27TH RD N

0

0 1 0 12/18/2014844 N Jacksonville St 0844 N JACKSONVILLE ST

0

0 1 0 12/11/20143160 17th St N 03160 17TH ST N

0

0 1 0 12/11/20145908 28th St N 05908 28TH ST N

0

0 1 0 12/10/20143124 N Nelson St 03124 N NELSON ST

0

0 1 0 12/10/20145031 25th St N 05031 25TH ST N

0

0 1 0 12/08/20146406 28th St N 06406 28TH ST N

0

0 1 0 12/04/20141330 N Harrison St 01330 N HARRISON ST

0

0 1 0 11/24/20145858 26th St N 05858 26TH ST N

0

0 1 0 11/20/20141227 N Quintana St 01227 N QUINTANA ST

0

0 1 0 11/20/20144011 17th St N 04011 17TH ST N

0

0 1 0 11/20/20145624 8th St N 05624 8TH ST N

0

0 1 0 11/18/20142815 23rd Rd N 02815 23RD RD N

0

Page 3 of 7Projects Under Construction Through 12/31/2014

Page 24: Annual Development Highlights 2014 · Annual Development Highlights 2014 Community Planning, Housing & Development January 1, 2014 - December 31, 2014 roduced by the Department of

Office Retail Residential Hotel

(s.f.) (s.f.) Units Rooms

Other*(s.f.) Number**

Site PlanStartProject Name Address Date

0 1 0 11/14/20145725 25th St N 05725 25TH ST N

0

0 1 0 10/29/2014632 19th St S 0632 19TH ST S

0

0 1 0 10/23/20141805 N Monroe St 01805 N MONROE ST

0

0 1 0 10/20/20144134 23rd St N 04134 23RD ST N

0

0 1 0 10/17/20143029 N Nottingham St 03029 N NOTTINGHAM ST

0

0 1 0 10/17/20143031 N Nottingham St 03031 N NOTTINGHAM ST

0

0 1 0 10/09/2014849 N Jacksonville St 0849 N JACKSONVILLE ST

0

0 1 0 10/08/20142203 S Monroe St 02203 S MONROE ST

0

0 1 0 10/08/20142205 S Monroe St 02205 S MONROE ST

0

0 1 0 10/08/20143600 John Marshall Dr 03600 JOHN MARSHALL DR

0

0 1 0 10/08/20144884 Williamsburg Blvd 04884 WILLIAMSBURG BLVD

0

0 1 0 10/07/20146219 31St St N 06219 31ST ST N

0

0 1 0 10/06/20142701 N Nelson St 02701 N NELSON ST

0

0 1 0 10/06/20143308 N Pocomoke St 03308 N POCOMOKE ST

0

0 1 0 10/02/20144775 Williamsburg Blvd 04775 WILLIAMSBURG BLVD

0

0 1 0 10/01/2014851 N Jefferson St 0851 N JEFFERSON ST

0

0 1 0 09/30/20143515 N Utah St 03515 N UTAH ST 0

0 1 0 09/26/20144677 35th St N 04677 35TH ST N 0

0 1 0 09/24/20144307 37th Rd N 04307 37TH RD N 0

0 1 0 09/24/20146042 27th St N 06042 27TH ST N 0

0 1 0 09/22/20143701 N Wakefield St 03701 N WAKEFIELD ST

0

0 1 0 09/19/20146901 Williamsburg Blvd 06901 WILLIAMSBURG BLVD

0

0 1 0 09/12/20141833 N Quesada St 01833 N QUESADA ST 0

0 1 0 09/10/20141850 N Columbus St 01850 N COLUMBUS ST

0

0 1 0 09/09/20145728 25th St N 05728 25TH ST N 0

0 1 0 08/29/201426 N Fenwick St 026 N FENWICK ST 0

0 1 0 08/26/20142918 24th St N 02918 24TH ST N 0

0 1 0 08/25/20141515 N Edison St 01515 N EDISON ST 0

0 1 0 08/25/20141517 N Edison St 01517 N EDISON ST 0

0 1 0 08/25/20145718 27th St N 05718 27TH ST N 0

0 1 0 08/22/20143200 N Kensington St 03200 N KENSINGTON ST

0

0 1 0 08/04/20142310 N Glebe Rd 02310 N GLEBE RD 0

0 1 0 08/04/2014305 N Edgewood St 0305 N EDGEWOOD ST

0

Page 4 of 7Projects Under Construction Through 12/31/2014

Page 25: Annual Development Highlights 2014 · Annual Development Highlights 2014 Community Planning, Housing & Development January 1, 2014 - December 31, 2014 roduced by the Department of

Office Retail Residential Hotel

(s.f.) (s.f.) Units Rooms

Other*(s.f.) Number**

Site PlanStartProject Name Address Date

0 1 0 07/30/20143413 N Randolph St 03413 N RANDOLPH ST

0

0 1 0 07/16/201415 N Jackson St 015 N JACKSON ST 0

0 1 0 07/16/201419 N Jackson St 019 N JACKSON ST 0

0 1 0 07/16/20143612 N Dickerson St 03612 N DICKERSON ST

0

0 1 0 07/14/20141905 S Glebe Rd 01905 S GLEBE RD 0

0 1 0 07/14/20143114 19th St S 03114 19TH ST S 0

0 1 0 07/11/20143856 N Glebe Rd 03856 N GLEBE RD 0

0 1 0 07/08/20142990 N Underwood St 02990 N UNDERWOOD ST

0

0 1 0 07/01/20146294 15th Rd N 06294 15TH RD N 0

0 1 0 06/25/20146018 Williamsburg Blvd 06018 WILLIAMSBURG BLVD

0

0 1 0 06/12/20141885 Patrick Henry Dr 01885 PATRICK HENRY DR

0

0 1 0 06/10/20146126 22Nd St N 06126 22ND ST N 0

0 1 0 06/06/20142009 N Madison St 02009 N MADISON ST 0

0 1 0 06/02/20141813 N Calvert St 01813 N CALVERT ST 0

0 1 0 05/22/20145733 6th St N 05733 6TH ST N 0

0 1 0 05/19/20144513 37th Pl N 04513 37TH PL N 0

0 1 0 05/16/20142457 N Sycamore St 02457 N SYCAMORE ST

0

0 1 0 05/13/20144012 N Upland St 04012 N UPLAND ST 0

0 1 0 05/08/20142102 N Dinwiddie St 02102 N DINWIDDIE ST

0

0 1 0 05/07/2014410 Chain Bridge Rd 0410 CHAIN BRIDGE RD

0

0 1 0 05/06/20141771 Army Navy Dr 01771 ARMY NAVY DR 0

0 1 0 05/06/20141781 Army Navy Dr 01781 ARMY NAVY DR 0

0 1 0 05/06/20142413 N Vernon St 02413 N VERNON ST 0

0 1 0 05/05/20146575 Little Falls Rd 06575 LITTLE FALLS RD

0

0 1 0 05/05/2014930 N Daniel St 0930 N DANIEL ST 0

0 1 0 04/30/2014928 N Daniel St 0928 N DANIEL ST 0

0 1 0 04/29/20142126 N Rolfe St 02126 N ROLFE ST 0

0 1 0 04/22/20143906 N Wakefield St 03906 N WAKEFIELD ST

0

0 1 0 04/17/20141743 N Quincy St 01743 N QUINCY ST 0

0 1 0 04/11/20146321 36th St N 06321 36TH ST N 0

0 1 0 04/08/20141312 N Evergreen St 01312 N EVERGREEN ST

0

0 1 0 04/08/20145213 26th Rd N 05213 26TH RD N 0

0 1 0 04/02/20142804 N Jefferson St 02804 N JEFFERSON ST

0

0 1 0 03/31/20141311 19th St S 01311 19th ST S 0

0 1 0 03/31/20142645 N Ohio St 02645 N OHIO ST 0

0 1 0 03/28/20141031 23rd St S 01031 23RD ST S 0

0 1 0 03/27/20142351 N Daniel St 02351 N DANIEL ST 0

0 1 0 03/26/20142613 24th St N 02613 24TH ST N 0

0 1 0 03/21/20143483 N Venice St 03483 N VENICE ST 0

0 1 0 03/18/20141921 N George Mason Dr 01921 N GEORGE MASON DR

0

0 1 0 03/18/20142737 N Wakefield St 02737 N WAKEFIELD ST

0

Page 5 of 7Projects Under Construction Through 12/31/2014

Page 26: Annual Development Highlights 2014 · Annual Development Highlights 2014 Community Planning, Housing & Development January 1, 2014 - December 31, 2014 roduced by the Department of

Office Retail Residential Hotel

(s.f.) (s.f.) Units Rooms

Other*(s.f.) Number**

Site PlanStartProject Name Address Date

0 1 0 03/13/20141814 N Lincoln St 01814 N LINCOLN ST 0

0 1 0 03/04/20144408 33rd Rd N 04408 33RD RD N 0

0 1 0 02/27/20141919 N George Mason Dr 01919 N GEORGE MASON DR

0

0 1 0 02/21/20143886 30th St N 03886 30TH ST N 0

0 1 0 02/21/20143888 30th St N 03888 30TH ST N 0

0 1 0 02/11/20144012 N Woodstock St 04012 N WOODSTOCK ST

0

0 1 0 02/05/20145527 3rd St S 05527 3RD ST S 0

0 1 0 02/05/20145908 35th St N 05908 35TH ST N 0

0 1 0 02/04/20146113 29th St N 06113 29TH ST N 0

0 1 0 12/27/20134851 Williamsburg Blvd 04851 WILLIAMSBURG BLVD

0

0 1 0 12/27/20135156 37th St N 05156 37TH ST N 0

0 1 0 12/06/20133121 24th St S 03121 24TH ST S 0

0 1 0 11/15/20136128 Williamsburg Blvd 06128 WILLIAMSBURG BLVD

0

0 1 0 11/04/2013723 N Dansville St 0723 N DANVILLE ST

0

0 1 0 11/01/20135218 12th St N 05218 12TH ST N 0

0 1 0 10/24/20133155 20th St N 03155 20TH ST N 0

0 1 0 10/04/20133018 N Westmorland St 03018 N WESTMORELAND ST

0

0 1 0 09/30/20133311 N Abingdon St 03311 N ABINGDON ST

0

0 1 0 09/10/20132003 N George Mason Dr 02003 N GEORGE MASON DR

0

0 1 0 09/06/20132361 N Edgewood St 02361 N EDGEWOOD ST

0

0 1 0 08/22/20133503 13th St N 03503 13TH ST N 0

0 1 0 07/30/20132739 Lorcom Ln 02739 LORCOM LN 0

0 1 0 06/25/20133024 N Dickerson St 03024 N DICKERSON ST

0

0 1 0 06/24/20132126 N Rolfe St 02126 N ROLFE ST 0

0 1 0 05/30/20132614 Washington Blvd 02614 WASHINGTON BLVD

0

0 1 0 04/15/2013715 N Jefferson St 0715 N JEFFERSON ST

0

0 1 0 04/08/20135805 37th St N 05805 37TH ST N 0

0 1 0 12/20/20126413 27th St N 06413 27TH ST N 0

0 1 0 10/12/20126518 Little Falls Rd 06413 27TH ST N 0

0 1 0 08/24/20123507 N Dinwiddie St 03507 N DINWIDDIE ST

0

0 1 0 01/26/20124407 6th St S 04407 6TH ST S 0

0 1 0 03/14/20113515 14th St N 03515 14TH ST N 0

0 1 0 08/06/20105219 26th St N 05219 26TH ST N

0

0 1 0 10/31/20082712 N Buchanan St 02712 N BUCHANAN ST

0

0 1 0 09/18/20082755 N Quincy St 02755 N QUINCY ST

0

0 1 0 09/12/20082700 N Buchanan St 02700 N BUCHANAN ST

0

0 1 0 05/07/20086248 23rd St N 06248 23RD ST N 0

Page 6 of 7Projects Under Construction Through 12/31/2014

Page 27: Annual Development Highlights 2014 · Annual Development Highlights 2014 Community Planning, Housing & Development January 1, 2014 - December 31, 2014 roduced by the Department of

Office Retail Residential Hotel

(s.f.) (s.f.) Units Rooms

Other*(s.f.) Number**

Site PlanStartProject Name Address Date

0 1 0 11/16/20074007 Vacation Ln 04007 VACATION LN

0

0 1 0 10/31/20071110 18th St S 01110 18TH ST S

0

0 1 0 10/09/20072008 S Monroe St 02008 S MONROE ST

0

0 1 0 06/22/20072507 9th St N 02507 9TH ST N

0

0 0 128 00OUTSIDE METRO SUBTOTAL

0 0 144 00SINGLE-FAMILY HOUSES SUBTOTAL

569,739 146,818 2,852 0ARLINGTON TOTAL 349,166

* Includes schools, health care facilities, recreation centers, fire houses, etc.

** Numbers listed refer to the site plan number. Other codes are as follows: B-R = By-right; FBC = Formed Based Code; PROF = Proffer; UP = Use Permit; URD = Unified Residential Development; UCMUD = Unified Commercial Mixed Use Development; and Sp. Ag. = Special Agreement.

Page 7 of 7Projects Under Construction Through 12/31/2014

Page 28: Annual Development Highlights 2014 · Annual Development Highlights 2014 Community Planning, Housing & Development January 1, 2014 - December 31, 2014 roduced by the Department of

Summary of DemolitionsArlington County, Virginia

01/01/2014 Through 12/31/2014

Office Retail Residential Hotel

(s.f.) (s.f.) Units Rooms

Other*(s.f.) Number**

Site PlanDemolitionProject Name Address Date

ROSSLYN

0 10 0 11/10/2014Pierce Queen Apartments (for Union on Queen)

0 4251515 N QUEEN ST

0

0 10 0 11/10/2014Pierce Queen Apartments (for Union on Queen)

0 4251521 N QUEEN ST

0

0 10 0 11/10/2014Pierce Queen Apartments (for Union on Queen)

0 4251520 N PIERCE ST

0

0 0 0 11/10/2014Wheeler-Lynn Bldg. (for Central Place)

0 1031730 N LYNN ST 45,523

11,862 0 0 04/24/2014McDonald's (for Central Place)

0 1201823 N MOORE ST 0

45,523 11,862 30 00ROSSLYN SUBTOTAL

COURT HOUSE

4,010 0 0 12/12/2014South Eastern Printing (for 2401 Wilson)

02401 WILSON BLVD 0

6,435 0 0 12/12/2014Southeastern Printing (for 2401 Wilson)

02407 WILSON BLVD 0

0 0 0 12/09/20142 story office (for 2311 Wilson)

02305 WILSON BLVD 1,722

2,704 0 0 12/09/2014Derand Realty/A&M Concepts Company (for 2311 Wilson)

02317 WILSON BLVD 2,704

2,308 0 0 12/09/2014Palladio's Cafe/Mr. Hibachi (for 2311 Wilson)

02311 WILSON BLVD 2,308

6,734 15,457 0 00COURT HOUSE SUBTOTAL

VIRGINIA SQUARE

7,480 0 0 07/10/20143601 N Fairfax Dr. (for Latitude)

03601 FAIRFAX DR 7,480

3,472 0 0 07/10/2014Bank of America (for Latitude)

03625 FAIRFAX DR 0

7,480 10,952 0 00VIRGINIA SQUARE SUBTOTAL

CRYSTAL CITY

8,215 0 0 07/29/2014Eads Post Office (for SP 424) 0 B-R1720 S EADS ST 0

0 8,215 0 00CRYSTAL CITY SUBTOTAL

LEE HIGHWAY

33,746 0 0 01/29/2014Bergmann's Dry Cleaners (for Bergmann's)

0 4202147 LEE HWY 0

Page 1 of 7Summary of Demolitions 01/01/2014 Through 12/31/2014

Page 29: Annual Development Highlights 2014 · Annual Development Highlights 2014 Community Planning, Housing & Development January 1, 2014 - December 31, 2014 roduced by the Department of

Office Retail Residential Hotel

(s.f.) (s.f.) Units Rooms

Other*(s.f.) Number**

Site PlanDemolitionProject Name Address Date

0 33,746 0 00LEE HIGHWAY SUBTOTAL

EAST FALLS CHURCH

0 0 0 07/09/2014Shreve's Oil Co 4,444 B/R6873 LEE HWY 0

0 0 0 04,444EAST FALLS CHURCH SUBTOTAL

OUTSIDE METRO

0 0 0 04/02/20142631 Shirlington Rd (for by-right development)

40,0002631 SHIRLINGTON RD

0

0 0 0 040,000OUTSIDE METRO SUBTOTAL

59,737 80,232 30 044,444 SUBTOTAL

SINGLE-FAMILY HOUSES

COURT HOUSE

0 1 0 05/01/20142518 12th St N 02518 12TH ST N

0

0 1 0 04/07/20142511 16th St N 02511 16TH ST N

0

0 0 2 00COURT HOUSE SUBTOTAL

CLARENDON

0 1 0 10/09/20141512 N Garfield St 01512 N GARFIELD ST 0

0 1 0 10/06/20141405 N Herndon St 01405 N HERNDON ST

0

0 0 2 00CLARENDON SUBTOTAL

VIRGINIA SQUARE

0 1 0 12/19/2014813 N Lincoln St 0813 N LINCOLN ST

0

0 1 0 11/04/20143700 6th Rd N 03700 6TH RD N

0

0 0 2 00VIRGINIA SQUARE SUBTOTAL

BALLSTON

0 1 0 03/07/2014612 N Abingdon St 0612 N ABINGDON ST 0

0 0 1 00BALLSTON SUBTOTAL

COLUMBIA PIKE

0 1 0 11/12/20141550 13th St S 01550 13TH ST S 0

0 1 0 10/07/20143917 14th St S 03917 14TH ST S

0

0 1 0 05/16/20141210 S Walter Reed Dr 01210 S WALTER REED DR

0

0 1 0 03/10/20143606 6th St S 03606 6TH ST S 0

Page 2 of 7Summary of Demolitions 01/01/2014 Through 12/31/2014

Page 30: Annual Development Highlights 2014 · Annual Development Highlights 2014 Community Planning, Housing & Development January 1, 2014 - December 31, 2014 roduced by the Department of

Office Retail Residential Hotel

(s.f.) (s.f.) Units Rooms

Other*(s.f.) Number**

Site PlanDemolitionProject Name Address Date

0 0 4 00COLUMBIA PIKE SUBTOTAL

LEE HIGHWAY

0 1 0 11/24/20145252 25th Rd N 05252 25TH RD N

0

0 1 0 09/04/20142217 N Culpeper St 02217 N CULPEPER ST

0

0 1 0 03/31/20142006 N Culpeper St 02006 N CULPEPER ST

0

0 1 0 02/12/20142009 N Nelson St 02009 N NELSON ST 0

0 1 0 01/29/20142001 N Uhle St (For Bergmann's)

0 4202001 N UHLE ST 0

0 1 0 01/29/20142005 N Uhle St (for Bergmann's)

0 4202005 N UHLE ST 0

0 1 0 01/29/20142114 20th St N (for Bergmann's)

0 4202114 20TH ST N 0

0 1 0 01/29/20142118 20th St N (for Bergmann's)

0 4202118 20TH ST N 0

0 1 0 01/29/20142122 20th St N (for Bergmann's)

0 4202122 20TH ST N 0

0 0 9 00LEE HIGHWAY SUBTOTAL

OUTSIDE METRO

0 1 0 12/19/20145217 27th Rd N 05217 27TH RD N

0

0 1 0 12/15/20141330 N Harrison St 01330 N HARRISON ST

0

0 1 0 12/11/20143160 17th St N 03160 17TH ST N

0

0 1 0 12/11/20145908 28th St N 05908 28TH ST N

0

0 1 0 12/10/20143124 N Nelson St 03124 N NELSON ST

0

0 1 0 12/10/20145031 25th St N 05031 25TH ST N

0

0 1 0 12/09/20146406 28th St N 06406 28TH ST N 0

0 1 0 12/03/20141818 N Monroe St 01818 N MONROE ST

0

0 1 0 11/25/20145034 30th St N 05034 30TH ST N

0

0 1 0 11/25/20145858 26th St N 05858 26TH ST N

0

0 1 0 11/24/20145624 8th St N 05624 8TH ST N 0

0 1 0 11/20/20144011 17th St N 04011 17TH ST N 0

0 1 0 11/18/20141800 N Randolph St 01800 N RANDOLPH ST

0

0 1 0 11/17/20145725 25th St N 05725 25TH ST N

0

0 1 0 11/14/20142815 23rd Rd N 02815 23RD RD N 0

0 1 0 10/31/2014407 Chain Bridge Rd 0407 CHAIN BRIDGE RD

0

0 1 0 10/30/20141227 N Quintana St 01227 N QUINTANA ST 0

0 1 0 10/30/20143915 44th St N 03915 44TH ST N

0

0 1 0 10/29/2014632 19th St S 0632 19TH ST S 0

Page 3 of 7Summary of Demolitions 01/01/2014 Through 12/31/2014

Page 31: Annual Development Highlights 2014 · Annual Development Highlights 2014 Community Planning, Housing & Development January 1, 2014 - December 31, 2014 roduced by the Department of

Office Retail Residential Hotel

(s.f.) (s.f.) Units Rooms

Other*(s.f.) Number**

Site PlanDemolitionProject Name Address Date

0 1 0 10/28/20146901 Williamsburg Blvd 06901 WILLIAMSBURG BLVD

0

0 1 0 10/27/2014846 N Harrison St 0846 N HARRISON ST

0

0 1 0 10/24/20141713 N Taylor St 01713 N TAYLOR ST 0

0 1 0 10/20/20142318 N Richmond St 02318 N RICHMOND ST

0

0 1 0 10/20/2014849 N Jacksonville St 0849 N JACKSONVILLE ST

0

0 1 0 10/14/20142205 S Monroe St 02205 S MONROE ST

0

0 1 0 10/14/20146219 31St St N 06219 31ST ST N

0

0 1 0 10/08/20144884 Williamsburg Blvd 04884 WILLIAMSBURG BLVD

0

0 1 0 10/06/20142701 N Nelson St 02701 N NELSON ST

0

0 1 0 10/06/20143308 N Pocomoke St 03308 N POCOMOKE ST

0

0 1 0 10/06/20144405 36th St N 04405 36TH ST N

0

0 1 0 10/02/20144775 Williamsburg Blvd 04775 WILLIAMSBURG BLVD

0

0 1 0 10/01/20143600 John Marshall Dr 03600 JOHN MARSHALL DR

0

0 1 0 10/01/2014851 N Jefferson St 0851 N JEFFERSON ST

0

0 1 0 09/30/20143515 N Utah St 03515 N UTAH ST 0

0 1 0 09/29/20144307 37th Rd N 04307 37TH RD N 0

0 1 0 09/26/20144677 35th St N 04677 35TH ST N 0

0 1 0 09/24/20146042 27th St N 06042 27TH ST N 0

0 1 0 09/22/20143701 N Wakefield St 03701 N WAKEFIELD ST

0

0 1 0 09/12/20141833 N Quesada St 01833 N QUESADA ST 0

0 1 0 09/11/20142608 3rd St N 02608 3RD ST N 0

0 1 0 09/09/20145728 25th St N 05728 25TH ST N 0

0 1 0 08/29/201426 N Fenwick St 026 N FENWICK ST 0

0 1 0 08/26/20142918 24th St N 02918 24TH ST N 0

0 1 0 08/25/20141515 N Edison St 01515 N EDISON ST 0

0 1 0 08/22/20143200 N Kensington St 03200 N KENSINGTON ST

0

0 1 0 08/13/20141700 S Quincy St 01700 S QUINCY ST 0

0 1 0 08/05/20142745 N Randolph St 02745 N RANDOLPH ST

0

0 1 0 08/05/20145718 27th St N 05718 27TH ST N 0

0 1 0 07/31/20144413 Vacation Lane 04413 VACATION LN 0

0 1 0 07/30/20143413 N Randolph St 03413 N RANDOLPH ST

0

0 1 0 07/29/20142311 N Kensington St 02311 N KENSINGTON ST

0

0 1 0 07/29/2014305 N Edgewood St 0305 N EDGEWOOD ST

0

0 1 0 07/24/20143031 N Nottingham St 03031 N NOTTINGHAM ST

0

0 1 0 07/22/201419 N Highland St 019 N HIGHLAND ST 0

Page 4 of 7Summary of Demolitions 01/01/2014 Through 12/31/2014

Page 32: Annual Development Highlights 2014 · Annual Development Highlights 2014 Community Planning, Housing & Development January 1, 2014 - December 31, 2014 roduced by the Department of

Office Retail Residential Hotel

(s.f.) (s.f.) Units Rooms

Other*(s.f.) Number**

Site PlanDemolitionProject Name Address Date

0 1 0 07/17/20143612 N Dickerson St 03612 N DICKERSON ST

0

0 1 0 07/16/20143236 1st Pl N 03236 1ST PL N 0

0 1 0 07/11/20143856 N Glebe Rd 03856 N GLEBE RD 0

0 1 0 07/09/20146701 Williamsburg Blvd 06701 WILLIAMSBURG BLVD

0

0 1 0 07/08/20142450 N Lexington St 02450 N LEXINGTON ST

0

0 1 0 06/26/20141810 N Cleveland St 01810 N CLEVELAND ST

0

0 1 0 06/18/20141805 N Monroe St 01805 N MONROE ST

0

0 1 0 06/12/20141314 N Stafford St 01314 N STAFFORD ST

0

0 1 0 06/12/20141885 Patrick Henry Dr 01885 PATRICK HENRY DR

0

0 1 0 06/11/20144819 15th St N 04819 15TH ST N

0

0 1 0 06/06/20142009 N Madison St 02009 N MADISON ST

0

0 1 0 06/05/20142619 N Powhatan St 02619 N POWHATAN ST

0

0 1 0 06/05/20145733 6th St N 05733 6TH ST N

0

0 1 0 06/04/20146126 22nd St N 06126 22ND ST N

0

0 1 0 06/03/20143501 17th St N 03501 17TH ST N

0

0 1 0 06/02/20141813 N Calvert St 01813 N CALVERT ST

0

0 1 0 05/19/20144513 37th pl N 04513 37TH PL N

0

0 1 0 05/16/20142457 N Sycamore St 02457 N SYCAMORE ST

0

0 1 0 05/07/20141126 N Illinois St 01126 N ILLINOIS ST

0

0 1 0 05/06/20142413 N Vernon St 02413 N VERNON ST

0

0 1 0 05/05/20146575 Little Falls Rd 06575 LITTLE FALLS RD

0

0 1 0 05/02/20142405 1st Rd S 02405 1ST RD S

0

0 1 0 04/30/20142102 N Dinwiddie St 02102 N DINWIDDIE ST

0

0 1 0 04/30/20144631 23rd St N 04631 23RD ST N

0

0 1 0 04/30/2014928 N Daniel St 0928 N DANIEL ST

0

0 1 0 04/24/20145113 Yorktown blvd 05113 YORKTOWN BLVD

0

0 1 0 04/22/20143906 N Wakefield St 03906 N WAKEFIELD ST

0

0 1 0 04/21/20145442 22nd St N 05442 22ND ST N

0

0 1 0 04/17/20146018 Williamsburg Blvd 06018 WILLIAMSBURG BLVD

0

0 1 0 04/15/20142130 S Nelson St 02130 S NELSON ST

0

0 1 0 04/14/20144012 N Upland St 04012 N UPLAND ST

0

Page 5 of 7Summary of Demolitions 01/01/2014 Through 12/31/2014

Page 33: Annual Development Highlights 2014 · Annual Development Highlights 2014 Community Planning, Housing & Development January 1, 2014 - December 31, 2014 roduced by the Department of

Office Retail Residential Hotel

(s.f.) (s.f.) Units Rooms

Other*(s.f.) Number**

Site PlanDemolitionProject Name Address Date

0 1 0 04/11/20146321 36th St N 06321 36TH ST N

0

0 1 0 04/09/20142522 N Harrison St 02522 N HARRISON ST

0

0 1 0 04/09/20146294 15th Rd N 06294 15TH RD N

0

0 1 0 04/08/20145213 26th Rd N 05213 26TH RD N

0

0 1 0 04/08/20145808 22nd St N 05808 22ND ST N

0

0 1 0 04/04/2014904 N Cleveland St 0904 N CLEVELAND ST

0

0 1 0 04/04/2014908 N Cleveland St 0908 N CLEVELAND ST

0

0 1 0 04/02/20142804 N Jefferson St 02804 N JEFFERSON ST

0

0 1 0 03/31/20141743 N Quincy St 01743 N QUINCY ST 0

0 1 0 03/31/20142645 N Ohio St 02645 N OHIO ST 0

0 1 0 03/31/20142830 N Sycamore St 02830 N SYCAMORE ST

0

0 1 0 03/27/20141900 N Illinois St 01900 N ILLINOIS ST 0

0 1 0 03/27/20142604 3rd St N 02604 3RD ST N 0

0 1 0 03/27/20142607 N Powhatan St 02607 N POWHATAN ST

0

0 1 0 03/25/20143483 N Venice St 03483 N VENICE ST 0

0 1 0 03/19/20146531 Williamsburg Blvd 06531 WILLIAMSBURG BLVD

0

0 1 0 03/18/20142737 N Wakefield st 02737 N WAKEFIELD ST

0

0 1 0 03/18/20146106 30th St N 06106 30TH ST N 0

0 1 0 03/12/20145619 33rd St N 05619 33RD ST N 0

0 1 0 03/11/20146620 32nd St N 06620 32ND ST N 0

0 1 0 03/07/20145101 25th Pl N 05101 25TH PL N 0

0 1 0 03/06/20146109 26th St N 06109 26TH ST N 0

0 1 0 02/26/20143011 N Trinidad St 03011 N TRINIDAD ST 0

0 1 0 02/21/20142515 S Fern St 02515 S FERN ST 0

0 1 0 02/18/20143609 N Potomac St 03609 N POTOMAC ST 0

0 1 0 02/18/20145620 27th St N 05620 27TH ST N 0

0 1 0 02/11/20142008 N Jefferson St 02008 N JEFFERSON ST

0

0 1 0 02/11/20144012 N Woodstock St 04012 N WOODSTOCK ST

0

0 1 0 02/10/20141921 N George Mason Dr 01921 N GEORGE MASON DR

0

0 1 0 02/10/20142613 24th St N 02613 24TH ST N 0

0 1 0 02/10/20145633 Wilson Blvd 05633 WILSON BLVD 0

0 1 0 02/07/20145908 35th St N 05908 35TH ST N 0

0 1 0 02/06/20146113 29th St N 06113 29TH ST N 0

0 1 0 02/04/20141601 N Taylor St 01601 N TAYLOR ST 0

0 1 0 01/31/20141906 N Nottingham St 01906 N NOTTINGHAM ST

0

0 1 0 01/30/20144612 23rd St N 04612 23RD ST N 0

0 1 0 01/17/20145215 31st Rd N 05215 31ST RD N 0

0 1 0 01/08/2014405 Chain Bridge Rd 0405 CHAIN BRIDGE RD

0

Page 6 of 7Summary of Demolitions 01/01/2014 Through 12/31/2014

Page 34: Annual Development Highlights 2014 · Annual Development Highlights 2014 Community Planning, Housing & Development January 1, 2014 - December 31, 2014 roduced by the Department of

Office Retail Residential Hotel

(s.f.) (s.f.) Units Rooms

Other*(s.f.) Number**

Site PlanDemolitionProject Name Address Date

0 0 123 00OUTSIDE METRO SUBTOTAL

0 0 143 00SINGLE-FAMILY HOUSES SUBTOTAL

59,737 80,232 173 0ARLINGTON TOTAL 44,444

* Includes schools, health care facilities, recreation centers, fire houses, etc.

** Numbers listed refer to the site plan number. Other codes are as follows: B-R = By-right; FBC = Formed Based Code; PROF = Proffer; UP = Use Permit; URD = Unified Residential Development; UCMUD = Unified Commercial Mixed Use Development; and Sp. Ag. = Special Agreement.

Page 7 of 7Summary of Demolitions 01/01/2014 Through 12/31/2014