Upload
others
View
2
Download
0
Embed Size (px)
Citation preview
MPMKVVCL Annexure-I of ARR/Tariff Petition FY-17
ANNEXURE - I
NAME OF DISTRIBUTION LICENSEE: MPMKVVCL Bhopal
INDEX OF ARR & TARIFF FILING FORMATS FOR DISTRIBUTION AND RETAIL SUPPLY LICENSEES
Financial Formats
1 Sheet S1 Statement of Profit & Loss
2 Sheet S2 Balance Sheet
3 Sheet S3 Share Capital and Reserves & Surplus
4 Sheet S4 Current Assets and Liabilities
5 Sheet S5 Financial Investments
6 Sheet S6 Deferred Tax Asset/Liability
7 Sheet S7 Other Long Term Liability
8 Sheet S8 Long Term Loan & Advances
Expenses formats
9 Sheet A1 Aggregate Revenue Requirement
9 Sheet F1 Revenue from Tariff and Charges
10 Sheet F1 Power Purchase cost
11 Sheet F1a Month-wise power procurement details
12 Sheet F1b Energy Balance : Energy Input and Cost of Pool Power
13 Sheet F1c Intra State Transmission (MPTRANSCO) Charges
14 Sheet F1d Intra State Inter Discom UI details
15 Sheet F1e Inter-State Transmission Charges
16 Sheet F1f SLDC Charges
17 Sheet F2 Gross Fixed Assets
18 Sheet F2a Depreciation and provision for depreciation
19 Sheet F2a(i) Fixed Assets - Historical Information
20 Sheet F2b Investment Plan - Master
21 Sheet F2b(i) Commissioning / Capitalisation Plan - Master
22 Sheet F2b(ii) Year-wise Capital Expenditure
23 Sheet F2b(iii) Financing of capitalised works
24 Sheet F2c Capital Works in Progress - Summary Statement
25 Sheet F2d Details of Expenses Capitalised
26 Sheet F2e Contribution Grants & subsidies towards Capital assets
27 Sheet F3 Interest & Finance charges
28 Sheet F3a Calculation of weighted average rate of interest on actual loans
29 Sheet F4 Working Capital Requirements
30 Sheet F5 R&M Expenses
31 Sheet F6 Employees' Cost & Provisions
32 Sheet F7 Administration & General Expenses
33 Sheet F8 Return on Equity
34 Sheet F9 Statement of Sundry Debtors & provision for bad & doubtful debtors
35 Sheet F10 Extraordinary Items
36 Sheet F11 Net Prior Period Expenses/Income
37 Sheet F12 Other expenses
38 Sheet F13 Income Tax Provisions
39 Sheet F14 Other income
40 Sheet F14a Income from Miscellaneous Charges from consumers
41 Sheet F14b Expenses and Income from Business other than Licensed business
42 Sheet F15 Consumer Security Deposit
43 Sheet F16 Lease Rental
44 Sheet P1 T&D Losses in LT and HT System
45 Sheet P2 Distribution Losses
46 Sheet P3 Details of physical characterisitics of the network
Revenue formats
47 Sheet R1 Monthly projection of sales in MU for the MYT Period
48 Sheet R2 Summary of Actual / estimated Revenue from sale of power
49 Sheet R3 Revenue from Current Tariff & Charges for LT consumers in urban area
50 Sheet R4 Revenue from Current Tariff & Charges for LT consumers in rural area
51 Sheet R5 Total Revenue from Current Tariff & Charges ( LT URBAN + RURAL AND HT)
52 Sheet R6 Summary of revenues and gaps/surpluses across major categories
53 Sheet R7 Income from Wheeling Charges
MPMKVVCL Annexure-I of ARR/Tariff Petition FY-18
Name of Distribution Licensee: MPMKVVCL BHOPAL
Statement of Profit & Loss Form No: S1
All figures in Rs Crores
Particulars
FY17 FY18 FY19
I. Revenue from operations (including Revenue Subsidy) R4a 8,053.67 8,478.36 9,738.74
II. Other income 212.28 197.76 210.05
III. Income from other business allocated to Licensed business F14 b - - -
IV Total Revenue (I + II+III) 8,265.95 8,676.12 9,948.80
V Expenses:
Purchase of Power from MP Genco F1 5,419.66 6,364.72
Purchase of Power from Other Sources F1
Inter-State Transmission charges F1e 528.70 662.95
Intra-State Transmission (MP Transco) Charges F1c 793.07 861.64
SLDC Charges F1f 3.05 3.05
Depreciation and amortzation expenses F2a 272.54 223.38 253.95
Interest & Finance Charges F3 583.37 270.11 307.58
Repairs and Maintenance F5 78.94 152.59 169.55
Employee costs F6 897.12 950.84 1,167.36
Administration and General expenses F7 98.49 103.33 110.38
Net prior period credit charges F11 - - -
Other Debits, Write-offs F12 464.90 84.78 97.39
Lease Rental F16 - - -
MYT 2016-17 to 2018-19Form Ref:
8,686.77
MPMKVVCL Annexure-I of ARR/Tariff Petition FY-18
Name of Distribution Licensee: MPMKVVCL BHOPAL
Statement of Profit & Loss Form No: S1
All figures in Rs Crores
Particulars
FY17 FY18 FY19
MYT 2016-17 to 2018-19Form Ref:
Total Expenses 11,082.14 8,529.52 9,998.57
VI Profit before extraordinary items and tax (IV-V) - 2,816.19 146.60 - 49.78
VII Extraordinary Items 308.70 - -
VIII Profit before tax 2,507.49- 146.60 49.78-
IX Tax expense: - - -
(1) Current tax
(2) Deferred tax
X Return on Equity 239.00 273.95 309.82
XI Profit (Loss) for the period from continuing operations - 2,746.49 - 127.35 - 359.60
XII Profit/(loss) from discontinuing operations - - -
XIII Tax expense of discontinuing operations - - -
XIV Profit/(loss) from Discontinuing operations (after tax) - - -
XIV Profit (Loss) for the period - 2,746.49 - 127.35 - 359.60
MPMKVVCL Annexure-I of ARR/Tariff Petition FY-18
Name of Distribution Licensee : MPMKVVCL BHOPALBalance Sheet Form No: S2
All figures in Rs Crores
Particulars
FY17 FY18 FY19
I EQUITY AND LIABILITIES
(1) Shareholders’ funds(a ) Share capital S3 1,961.13 1,977.37 1,977.37
(b ) Reserves and surplus S3 - 13,695.70 - 13,358.55 - 13,358.55
(c ) Money received against share warrants - - -
(2) Share application money pending allotment S3 1,640.22 1,640.22
(3) Non-current liabilities
(a ) Long-term borrowings F3b 11,618.91 3,742.53 4,409.67
(b ) Deferred tax liabilities (Net) S6 - -
(c ) Other Long term liabilities S7 2,834.65 2,726.04 2,780.34
(d ) Long-term provisions S7 1,690.80 180.68 186.42
(e) Perpetual Loan F3b -
(4) Current liabilities
(a ) Short-term borrowings S4 2,387.54 11,463.35 11,456.94
(b ) Trade payables S4 5,439.93 4,845.40 5,142.66
(c ) Other current liabilities S4 185.54 201.27 201.19
(d ) Short-term provisions S4 - - -
(e) Consumer Contribution S4 - - -
TOTAL 12,423 13,418 14,436
II. ASSETS
(1)Non-current assets
Ref FormMYT 2016-17 to 2018-19
MPMKVVCL Annexure-I of ARR/Tariff Petition FY-18
Name of Distribution Licensee : MPMKVVCL BHOPALBalance Sheet Form No: S2
All figures in Rs Crores
Particulars
FY17 FY18 FY19Ref Form
MYT 2016-17 to 2018-19
(a) Fixed assets
Gross Block (Net of assets not in use) F2 6,634.42 7,371.75 8,128.85
less: Accumulated Depreciation F2a 518.22 665.16 893.07
Net Block 6,116.19 6,706.58 7,235.78
Capital work-in-progress F2c 687.41 1,525.46 1,944.05
(b) Non-current investments S5 - - -
(c) Deferred tax assets (net) S6 - - -
(d) Long-term loans and advances given by Utility S8 - - -
(e) Other non-current assets S8 665.24 692.00 678.62
(2) Current assets
(a ) Current investments S4 - - -
(b ) Inventories S4 141.60 142.47 142.03
(c ) Trade receivables S4 3,597.05 3,159.97 3,232.21
(d ) Cash and cash equivalents S4 806.84 801.18 804.01
(e ) Short-term loans and advances S4 0.29 0.34 0.32
(f ) Other current assets S4 408.19 390.30 399.24
TOTAL 12,423 13,418 14,436
MPMKVVCL Annexure-I of ARR/Tariff Petition FY-18
Name of Distribution Licensee: MPMKVVCL BHOPALShare Capital and Reserves & Surplus Form No: S3
All figures in Rs Crores
Sl.No. Description of capital
FY16 FY17 FY18 FY19 FY16
A SHARE CAPITAL
Equity Capital 1,944.89 1,961.13 1,977.37 1,977.37 26.66
B RESERVES & SURPLUS
RESERVES
Insurance Reserve 69.15 69.15 69.15 69.15 -
Profit and Loss 11,401.07- 13,985.79- 15,218.90- 15,218.90- 2,584.72-
Ind AS Transition Reserve 186.17- 186.17- 186.17- 186.17- -
Sub-total of Reserves 11,518.09- 14,102.81- 15,335.92- 15,335.92- 2,584.72-
SURPLUS
Surplus (inclduing debit balalnce of
P&L)
Total Reserves & Surplus 9,573.20- 12,141.68- 13,358.55- 13,358.55- 2,558.06-
C Money received against share warrants - - - - -
DShare Application money pending
allotment- - 1,640.22 1,640.22
Appropriation
during the yearOpening Balance
MPMKVVCL Annexure-I of ARR/Tariff Petition FY-18
Name of Distribution Licensee: MShare Capital and Reserves & Surplus
Sl.No. Description of capital
A SHARE CAPITAL
Equity Capital
B RESERVES & SURPLUS
RESERVES
Insurance Reserve
Profit and Loss
Ind AS Transition Reserve
Sub-total of Reserves
SURPLUS
Surplus (inclduing debit balalnce of
P&L)
Total Reserves & Surplus
C Money received against share warrants
DShare Application money pending
allotment
Form No: S3
s All figures in Rs Crores
FY17 FY18 FY19 FY16 FY17 FY18 FY19 FY16 FY17 FY18 FY19
16.24 1,971.55 1,977.37 1,977.37 1,977.37
- - - - - - - 69.15 69.15 69.15 69.15
1,233.11- 13,985.79- 15,218.90- 15,218.90- 15,218.90-
- 186.17- 186.17- 186.17- 186.17-
1,233.11- - - - - - - 14,102.81- 15,335.92- 15,335.92- 15,335.92-
1,216.87- - - - - - - 12,131.26- 13,358.55- 13,358.55- 13,358.55-
- - - - - - - - - - -
1,656.46 16.24 - 1,640.22 1,640.22 1,640.22
Withdraw
als during
the year
Balance at the end of the year
MPMKVVCL Annexure-I of ARR/Tariff Petition FY-18
Name of Distribution Licensee : MPMKVVCL BHOPAL
Current Assets & Liabilities Form No: S4
All figures in Rs Crores
Sl.No. Particulars
FY17 FY18 FY19
A Current Assets, Loans and Advances
(a ) Current investments - - -
(b ) Inventories 141.60 142.47 142.03
(c ) Trade receivables 3,597.05 3,159.97 3,232.21
(d ) Cash and cash equivalents 806.84 801.18 804.01
(e ) Short-term loans and advances 0.29 0.34 0.32
(f ) Other current assets 408.19 390.30 399.24
TOTAL OF 'A' 4,953.97 4,494.25 4,577.81
B Current Liabilities
(a ) Short-term borrowings 2,834.65 11,463.35 11,456.94
(b ) Trade payables 5,439.93 4,845.40 5,142.66
(c ) Other current liabilities 201.11 201.27 201.19
(d ) Short-term provisions - - -
(e) Consumer Contribution - - -
TOTAL OF 'B' 8,475.69 16,510.01 16,800.79
MYT 2016-17 to 2018-19
MPMKVVCL Annexure-I of ARR/Tariff Petition FY-18
Name of Distribution Licensee : MPMKVVCL BHOPAL
Financial Investments Form No: S5
All figures in Rs Crores
PY
FY16 FY17 FY18 FY19
Financial Investments
Opening balance - - - -
Further investments during the year - - - -
Investments realised during the year - - - -
Closing balance - - - -
ParticularsMYT 2016-17 to 2018-19
MPMKVVCL Annexure-I of ARR/Tariff Petition FY-18
Name of Distribution Licensee : MPMKVVCL BHOPAL
Deferred Tax Asset/Liability Form No: S6
All figures in Rs Crores
Sl.No. Description of capital PY
FY16 FY17 FY18 FY19
Deferred Tax Asset/Liability
MYT 2016-17 to 2018-19
NIL
MPMKVVCL Annexure-I of ARR/Tariff Petition FY-18
Name of Distribution Licensee : MPMKVVCL BHOPAL
Other Long Term Liability Form No: S7
All figures in Rs Crores
Sl.No. Description of capital PY
FY16 FY17 FY18 FY19
A Other Long term liabilities
Advance received for RGGY project 46.621, 46,622 - -
Subsidy To Co-Operative Fedration
Security Deposits From Employees
Wage Revision Arears - - - -
Deposits/Retention From Suppliers
Contractors
46.100, 46.101,
46.102 - - - -
Security Deposits from Consumers 47.000, 48.100 697.74 773.83 735.79 754.81
B Deferred Income 1,919.68 2,060.82 1,990.25 2,025.54
Total 2,617.42 2,834.65 2,726.04 2,780.34
C Long-term provisions 44.110 169.20 192.16 180.68 186.42
Total * 2,786.62 3,026.81 2,906.72 2,966.76
Account CodeMYT 2016-17 to 2018-19
MPMKVVCL Annexure-I of ARR/Tariff Petition FY-18
Name of Distribution Licensee : MPMKVVCL BHOPAL
Long Term Loan & Advances Form No: S8
All figures in Rs Crores
Sl.No. Description PY
FY16 FY17 FY18 FY19
A Long Term Loan & Advances
Capital Advance to Suppliers/Contractors 25.000
Deposits with Suppliers / Contractors
Advances to Sector Entities 27.630
Advances recoverable in cash/kind for value
(tax etc) 27.640
Total Long Term Loan & Advances - - - -
B Other non-current assets 718.76 665.24 692.00 678.62
Total Other non-current assets 718.76 665.24 692.00 678.62
Account
Code
MYT 2016-17 to 2018-19
MPMKVVCL Annexure-I of ARR/Tariff Petition FY-18
Form No: A1
All figures in Rs Crores
Aggregate Revenue Requirement for Distribution and Retail Sale
Particulars CY
FY17 FY18 FY19
A Expenditure
IPower Purchase expenses, including Inter-State and Intra-State Transmission
charges and wheeling charges payable to any other Distribution Licensee8,686.77 6,744.48 7,892.36
II Aggregate Revenue Requirement of Retail Supply and Wheeling Activity 1,965.72 1,861.23 2,205.97
Total Aggregate Revenue Requirement for Distribution and Retail Sale
(I+II+III)10,652.49 8,605.71 10,098.34
Aggregate Revenue Requirement for Expenses related to Purchase of power - I All figures in Rs Crores
Particulars
FY17 FY18 FY19
Power Purchase or Energy Available (MU) 19,277 16,408 18,977
Sale of Power (MU) 12,309 13,438 15,735
Loss % 36.15% 18.00% 17.00%
Expenditure
Cost of power purchase, including T&D losses 7,659.96 5,419.66 6,364.72
Inter-State Transmission charges 528.70 662.95
Intra-state Transmission (MP Transco) charges 941.75 793.07 861.64
Wheeling charges payable to other distribution licensee - - -
MYT 2016-17 to 2018-19
MYT 2016-17 to 2018-19
MPMKVVCL Annexure-I of ARR/Tariff Petition FY-18
Form No: A1
SLDC fees and charges 2.62 3.05 3.05
Any other expenses* 82.44 - -
Total expenditure on power purchase 8,686.77 6,744.48 7,892.36
Aggregate Revenue Requirement For Retail Supply and Wheeling activity - II
All figures in Rs Crores
Particulars
FY17 FY18 FY19
A Expenditure
R&M Expense 136.05 152.59 169.55
Employee Expenses 921.58 950.84 1,167.36
A&G Expense 96.58 103.33 110.38
Depreciation 270.54 223.38 253.95
Interest & Finance Charges on project loans 227.94 183.31 201.75
Interest and Finance Charges on working capital loans 68.39 33.68 47.95
Interest and Finance Charges on Consumer Deposit 54.87 53.12 57.88
Lease Rental - - -
Any other expenses* 152.19 84.78 97.39
Return on Equity 239.00 273.95 309.82
2,167.15 2,058.99 2,416.03
B Less:
Other Income (inclusive of income from wheeling charges and excluding
DPS)201.43 197.76 210.05
Annual Revenue Requirement (A-B) 1,965.72 1,861.23 2,205.97
MYT 2016-17 to 2018-19
MPMKVVCL Annexure-I of ARR/Tariff Petition FY-18
Power Purchase cost (FY 2017) 33.24% Form No: F1
Amount in Rs. Crore
Sl No Source
Plant
Capacity
(MW)
MP's Share
in %
MP's
Share in
MW
Discom
Share in
%
Discom
Share in
MW
Energy
Sent Out
(ESO) from
the Station
MU
Purchased /
generated
(ex-bus)
Total
Capacity
Charges -
incl.
Income
Tax
(Rs Crs)
Total Capacity
Charge per unit
(Rs per MW)
Total
ECR per
unit (Rs
per unit)
Total ECR
(Rs. Crs.)
All
Charges
Total in
Rs Crs
Average
rate
(P/kwh)
Inter-
State
Transmis
sion
Losses
(MU)
Net energy
delivered at
MP State
periphery
(MU)
A Central Sector 16,334 33% 1,159 18,814 5,909 827 114,331,824 1.99 1,175 2,002 3.39 214 5,695
1 NTPC Korba 2,100.00 22.79% 479 33% 159.07 3,487.30 1,087 90 5,635,962.56 1.64 179 268.48 2.47 40 1,048
2 NTPC Korba III 500.00 16.04% 80 33% 26.65 619.96 194 28 10,383,446.54 1.53 30 57.31 2.96 7 186
3 NTPC Vindyachal I 1,260.00 35.01% 441 33% 146.65 1,932.39 603 90 6,115,906.48 2.28 137 227.17 3.77 22 581
4 NTPC Vindyachal II 1,000.00 31.65% 316 33% 105.20 1,865.69 583 52 4,914,988.25 2.13 124 175.92 3.02 21 562
5 NTPC Vindyachal III 1,000.00 24.35% 243 33% 80.93 1,622.42 507 72 8,936,120.06 2.08 106 177.99 3.51 19 489
6 NTPC Vindyachal IV 1,000.00 28.38% 284 33% 94.33 1,717.36 537 103 10,880,943.91 2.10 113 215.20 4.01 20 518
7 NTPC Vindyachal V Unit 1 500.00 28.31% 142 33% 47.05 887.22 277 49 10,319,765.07 2.03 56 104.82 3.79 10 267
8 NTPC Sipat I 1,980.00 17.03% 337 33% 112.07 2,628.98 818 118 10,519,672.66 1.53 125 243.08 2.97 30 788
9 NTPC Sipat II 1,000.00 18.55% 186 33% 61.67 1,507.56 472 71 11,486,844.81 1.56 73 144.28 3.06 17 454
10 NTPC Mouda I 1,000.00 18.10% 181 33% 60.18 135.79 43 70 11,585,522.21 2.72 12 81.32 19.10 2 41
11 NTPC Mouda II Unit 1 660.00 18.77% 124 33% 41.17 26.67 8 6 1,394,704.55 2.56 2 7.81 9.67 0 8
12 NTPC Mouda II Unit 2 18.77% - 33% - - - - #DIV/0! - - #DIV/0! - -
13 NTPC Kawas GPP 656.20 21.36% 140 33% 46.59 215.66 68 35 7,474,010.17 2.26 15 50.18 7.40 2 65
14 NTPC Gandhar GPP 657.39 17.83% 117 33% 38.96 242.95 76 26 6,680,957.43 2.00 15 41.26 5.43 3 73
15 NTPC Kahalgaon 2 1,500.00 4.93% 74 33% 24.58 237.59 73 20 8,002,978.91 2.25 16 36.16 4.92 2 72
16 KAPP Kakrapar 440.00 25.73% 113 33% 37.64 - - - - #DIV/0! 1 0.66 #DIV/0! - -
17 TAPP Tarapur 1,080.00 21.26% 230 33% 76.33 1,686.81 563 - - 3.02 170 170.01 3.02 20 543
18 NTPC Solapur STPS, Unit-1 25.15% - 33% - - - - #DIV/0! - - #DIV/0! - -
19 NTPC Solapur STPS, Unit-2 23.03% - 33% - - - - #DIV/0! - - #DIV/0! - -
20 NTPC Gadarwara STPS, Unit-1 50.00% - 33% - - - - #DIV/0! - - #DIV/0! - -
21 NTPC Gadarwara STPS, Unit-2 50.00% - 33% - - - - #DIV/0! - - #DIV/0! - -
22 NTPC Lara STPS, Raigarh, Unit I 7.98% - 33% - - - - #DIV/0! - - #DIV/0! - -
23 NTPC Lara STPS, Raigarh, Unit II 7.98% - 33% - - - - #DIV/0! - - #DIV/0! - -
B MP GENCO (THERMAL & HYDRO) 6,586 - 33% 2,004 15,876 5,110 1,218 74,190,336 2.21 1,131 2,349 4.60 - 5,110
1 Amarkantak TPS Ph-III 210.00 100.00% 210 33% 69.81 1,343.64 420 90 12,946,297.54 2.11 89 179.20 4.26 - 420
2 Satpura TPS Ph-II & III 830.00 100.00% 830 33% 275.91 1,115.83 344 113 4,098,322.70 2.92 100 213.42 6.21 - 344
3 Satpura TPS Ph-IV 500.00 100.00% 500 33% 166.21 2,118.00 659 239 14,359,827.27 2.29 151 389.54 5.92 - 659
4 SGTPS Ph-I & II 840.00 100.00% 840 33% 279.23 2,837.99 885 136 4,880,271.87 2.63 233 369.37 4.17 - 885
5 SGTPS Ph-III 500.00 100.00% 500 33% 166.21 3,446.09 1,070 148 8,925,415.33 2.42 259 407.13 3.80 - 1,070
6 Shri Singaji STPS, Ph-I 1,200.00 100.00% 1,200 33% 398.90 2,331.18 737 453 11,352,168.58 2.94 217 669.74 9.08 - 737
7 Shri Singaji Phase-2, Unit-1 660.00 90.00% 594 33% 197.46 - - - - #DIV/0! - - #DIV/0! - -
8 Shri Singaji Phase-2, Unit-2 660.00 90.00% 594 33% 197.46 - - - - #DIV/0! - - #DIV/0! - -
Name of Distribution Licensee : MPMKVVCL BHOPAL
Capacity Charges Energy Charges
MPMKVVCL Annexure-I of ARR/Tariff Petition FY-18
Power Purchase cost (FY 2017) 33.24% Form No: F1
Amount in Rs. Crore
Sl No Source
Plant
Capacity
(MW)
MP's Share
in %
MP's
Share in
MW
Discom
Share in
%
Discom
Share in
MW
Energy
Sent Out
(ESO) from
the Station
MU
Purchased /
generated
(ex-bus)
Total
Capacity
Charges -
incl.
Income
Tax
(Rs Crs)
Total Capacity
Charge per unit
(Rs per MW)
Total
ECR per
unit (Rs
per unit)
Total ECR
(Rs. Crs.)
All
Charges
Total in
Rs Crs
Average
rate
(P/kwh)
Inter-
State
Transmis
sion
Losses
(MU)
Net energy
delivered at
MP State
periphery
(MU)
Name of Distribution Licensee : MPMKVVCL BHOPAL
Capacity Charges Energy Charges
9 Rani Awanti Bai Sagar, Bargi HPS 90.00 100.00% 90 33% 29.92 443.14 150 (0) 51,195.56- 0.41 6 5.94 0.40 - 150
10 Bansagar Ph I HPS (Tons) 315.00 100.00% 315 33% 104.71 1,230.10 416 17 1,617,379.00 0.72 30 46.78 1.12 - 416
11 Bansagar Ph-II HPS (Silpara) 30.00 100.00% 30 33% 9.97 88.80 29 0 372,823.53 0.67 2 2.32 0.79 - 29
12 Bansagar Ph-III HPS (Deolond) 60.00 100.00% 60 33% 19.95 71.58 25 3 1,491,769.84 1.24 3 6.15 2.41 - 25
13 Bansagar Ph-IV HPS (Jhinna) 20.00 100.00% 20 33% 6.65 87.21 28 4 6,146,607.93 1.29 4 7.76 2.73 - 28
14 Birsinghpur HPS 20.00 100.00% 20 33% 6.65 40.62 14 2 2,730,518.62 1.10 2 3.40 2.36 - 14
15 Marhikheda HPS 60.00 100.00% 60 33% 19.95 145.73 50 11 5,303,522.64 1.73 9 19.25 3.84 - 50
16 Rajghat HPS 45.00 50.00% 23 33% 7.48 30.03 10 1 1,621,168.40 1.41 1 2.64 2.61 - 10
17 Gandhisagar HPS 115.00 50.00% 58 33% 19.11 173.12 57 (3) 1,604,561.71- 0.54 3 0.01- 0.00- - 57
18 Ranapratap Sagar HPS 172.00 50.00% 86 33% 28.59 372.66 124 - - 1.51 19 18.67 1.51 - 124
19 Jawahar Sagar HPS 99.00 - 33% - - 90 - - - 90
20 Pench HPS 160.00 66.67% 107 264.40 3 4 7.27 -
C JV Hydel & Other Hydels 3,326 - 33% 782 6,464 2,217 491 19,526,706 0.97 215 706 3.18 22 2,195
1 NHDC Indira Sagar HPS 1,000.00 100.00% 1,000 33% 332.42 3,253.33 1,112 274 8,238,376.20 1.14 127 401.12 3.61 - 1,112
2 NHDC Omkareshwar HPS 520.00 100.00% 520 33% 172.86 1,416.63 483 158 9,126,791.24 0.76 37 194.55 4.03 - 483
3 Sardar Sarovar HPS 1,450.00 57.00% 827 33% 274.74 1,785.10 622 59 2,161,538.54 0.82 51 110.37 1.78 22 599
4 NVDA Indira sagar LBC HPS 15.00 15.00% 2 33% 0.75 9.28 - - #DIV/0! - #DIV/0! -
5 NVDA Bargi LBC HPS 10.00 32.68% 3 33% 1.09 - - - #DIV/0! - #DIV/0! -
6 Rihand HPS 300.00 - - - - -
7 Matatila HPS 30.60 - - - - -
D DVC 2,840 - 33% - 1,662 580 174 - 2.20 128 302 5.20 13 567
1 DVC (MTPS) 840.00 0.00% - 33% - 627.95 519 135 2.19 114 248.82 4.79 12 507
2 DVC (CTPS) 1,000.00 - 33% - 1,033.68 61 39 2.31 14 53.00 8.71 1 59
3 DVC DTPS, Unit 1& Unit 2 1,000.00 0.00% - 195.40
E IPPs 9,335 - 33% 1,129 16,702 5,213 657 62,997,017 1.65 862 1,519 2.91 189 5,024
1 Torrent Power 765.00 9.80% 75 33% 24.93 0.08 0 23 9,045,961.15 10.80 0 22.58 10,256.29 0 0
2 BLA Power 90.00 35.00% 32 33% 10.47 15.48 5 6 6,081,192.05 2.70 1 7.65 16.10 - 5
3 Jaypee Bina Power 500.00 70.00% 350 33% 116.35 162.33 52 162 13,890,933.84 3.10 16 177.59 34.47 - 52
4 Lanco Amarkantak TPS Unit 1 300.00 100.00% 300 33% 99.73 1,903.88 596 94 9,471,742.50 1.67 99 193.88 3.26 22 574
5 Reliance UMPP, Sasan 3,960.00 37.50% 1,485 33% 493.64 10,425.05 3,253 57 1,159,849.85 1.81 590 646.81 1.99 119 3,134
6 Essar Power STPS 600.00 5.00% 30 33% 9.97 - - - - #DIV/0! - - #DIV/0! - -
7 Jaiprakash Power STPS, Nigri 1,320.00 37.50% 495 33% 164.55 3,302.06 1,028 190 11,557,412.75 0.96 98 288.56 2.81 38 990
8 MB Power STPS 1,200.00 35.00% 420 33% 139.62 869.11 273 84 6,028,831.75 2.04 56 139.78 5.13 10 263
MPMKVVCL Annexure-I of ARR/Tariff Petition FY-18
Power Purchase cost (FY 2017) 33.24% Form No: F1
Amount in Rs. Crore
Sl No Source
Plant
Capacity
(MW)
MP's Share
in %
MP's
Share in
MW
Discom
Share in
%
Discom
Share in
MW
Energy
Sent Out
(ESO) from
the Station
MU
Purchased /
generated
(ex-bus)
Total
Capacity
Charges -
incl.
Income
Tax
(Rs Crs)
Total Capacity
Charge per unit
(Rs per MW)
Total
ECR per
unit (Rs
per unit)
Total ECR
(Rs. Crs.)
All
Charges
Total in
Rs Crs
Average
rate
(P/kwh)
Inter-
State
Transmis
sion
Losses
(MU)
Net energy
delivered at
MP State
periphery
(MU)
Name of Distribution Licensee : MPMKVVCL BHOPAL
Capacity Charges Energy Charges
9 Jhabua Power STPS, Unit-1 600.00 35.00% 210 33% 69.81 23.71 7 40 5,761,092.95 2.65 2 42.18 56.75 0 7
10 Captive - - 33% - - - - #DIV/0! - - #DIV/0! - -
F Renewables - - 33% - 4,074 1,378 0 - 6.03 832 832 6.03 - 1,378
1 Solar - 100.00% - 33% - 930.87 311 - 6.92 215 215.43 6.92 - 311
2 Other than Solar - 100.00% - 33% - 3,143.27 1,067 0 5.78 616 616.16 5.78 - 1,067
Total 38,420 100.00% 38,420 33% 5,074 63,592 20,407 3,367 271,045,882 2.13 4,342 7,709 3.78 439 19,968
Revenue from sale of surplus 272.40
Net Costs 7,436.27
Rpo 43.95
PP costs 7,480.21
MPPMCL Costs 38.85-
Total PP costs 7,441.37
Total Cost - Ex Bus (D+E) 7,441.37
MPMKVVCL Annexure-I of ARR/Tariff Petition FY-18
Power Purchase cost (FY 2018) 29.17% Form No: F1
Amount in Rs. Crore
Sl No Source
Plant
Capacity
(MW)
MP's Share
in %
MP's
Share in
MW
Discom
Share in
%
Discom
Share in
MW
Energy Sent
Out (ESO)
from the
Station
MU
Purchased /
generated
(ex-bus)
Total
Capacity
Charges -
incl.
Income
Tax
(Rs Crs)
Total Capacity
Charge per unit
(Rs per MW)
Total ECR
per unit
(Rs per
unit)
Total
ECR (Rs.
Crs.)
All
Charges
Total in
Rs Crs
Average
rate
(P/kwh)
Inter-
State
Transmi
ssion
Losses
(MU)
Net energy
delivered at
MP State
periphery
(MU)
A Central Sector 21,514 4,852 29.17% 1,415 24,414 5,845 747 123,577,984 1.80 1,052 1,799 3.08 208 5,637
1 NTPC Korba 2,100.00 22.79% 479 29.17% 140 3,767 1,102 71.11 5,094,192.14 1.42 156 227 2.06 39 1,063
2 NTPC Korba III 500.00 15.23% 76 29.17% 22 623 182 22.87 10,292,461.80 1.15 21 44 2.41 6 175
3 NTPC Vindyachal I 1,260.00 35.01% 441 29.17% 129 3,023 673 74.24 5,769,643.75 2.21 149 223 3.31 24 649
4 NTPC Vindyachal II 1,000.00 31.65% 316 29.17% 92 2,220 584 45.62 4,942,026.18 1.83 107 152 2.61 21 563
5 NTPC Vindyachal III 1,000.00 24.35% 243 29.17% 71 1,942 509 55.49 7,814,194.92 1.81 92 148 2.90 18 491
6 NTPC Vindyachal IV 1,000.00 28.38% 284 29.17% 83 2,069 530 92.88 11,221,794.21 1.90 101 194 3.65 19 511
7 NTPC Vindyachal V Unit 1 500.00 28.31% 142 29.17% 41 1,092 282 47.86 11,593,308.90 1.82 51 99 3.52 10 272
8 NTPC Sipat I 1,980.00 17.03% 337 29.17% 98 2,590 759 97.90 9,954,806.98 1.34 102 200 2.63 27 732
9 NTPC Sipat II 1,000.00 18.55% 186 29.17% 54 1,487 435 52.51 9,704,285.25 1.39 61 113 2.60 15 419
10 NTPC Mouda I 1,000.00 18.10% 181 29.17% 53 1,384 149 69.22 13,107,578.99 3.11 46 116 7.76 6 143
11 NTPC Mouda II Unit 1 660.00 18.77% 124 29.17% 36 666 0 20.77 5,750,623.38 128.66 3 24 1,094.58 0 0
12 NTPC Mouda II Unit 2 660.00 18.77% 124 29.17% 36 390 - 12.92 3,576,854.32 #DIV/0! - 13 #DIV/0! - -
13 NTPC Kawas GPP 656.20 21.36% 140 29.17% 41 724 103 25.56 6,250,770.25 1.96 20 46 4.44 4 100
14 NTPC Gandhar GPP 657.39 17.83% 117 29.17% 34 566 104 26.39 7,719,768.95 1.95 20 47 4.48 4 101
15 NTPC Kahalgaon 2 1,500.00 4.93% 74 29.17% 22 490 87 16.67 7,727,782.54 2.41 21 38 4.33 2 85
16 KAPP Kakrapar 440.00 25.73% 113 29.17% 33 - - - - #DIV/0! - - #DIV/0! - -
17 TAPP Tarapur 1,080.00 21.26% 230 29.17% 67 1,189 346 - - 2.95 102 102 2.95 12 333
18 NTPC Solapur STPS, Unit-1 660.00 25.15% 166 29.17% 48 191 - 14.81 3,057,891.82 #DIV/0! - 15 #DIV/0! - -
19 NTPC Solapur STPS, Unit-2 660.00 23.03% 152 29.17% 44 - - - - #DIV/0! - - #DIV/0! - -
20 NTPC Gadarwara STPS, Unit-1 800.00 50.00% 400 29.17% 117 - - - - #DIV/0! - - #DIV/0! - -
21 NTPC Gadarwara STPS, Unit-2 800.00 50.00% 400 29.17% 117 - - - - #DIV/0! - - #DIV/0! - -
22 NTPC Lara STPS, Raigarh, Unit I 800.00 7.98% 64 29.17% 19 - - - - #DIV/0! - - #DIV/0! - -
23 NTPC Lara STPS, Raigarh, Unit II 800.00 7.98% 64 29.17% 19 - - - - #DIV/0! - - #DIV/0! - -
B MP GENCO (THERMAL & HYDRO) 6,586 6,185 29.17% 1,804 26,794 2,191 992.27 67,075,965 3.76 825 1,817 8.29 - 2,191
1 Amarkantak TPS Ph-III 210.00 100.00% 210 29.17% 61 1,602 148 65.11 10,628,720.79 5.62 83 148 10.03 - 148
2 Satpura TPS Ph-II & III 830.00 100.00% 830 29.17% 242 4,338 677 111.50 4,605,468.96 0.24 16 128 1.89 - 677
3 Satpura TPS Ph-IV 500.00 100.00% 500 29.17% 146 3,176 168 199.15 13,655,205.03 10.61 178 378 22.46 - 168
4 SGTPS Ph-I & II 840.00 100.00% 840 29.17% 245 3,863 55 107.41 4,383,963.69 43.12 236 343 62.77 - 55
Name of Distribution Licensee : MPMKVVCL BHOPAL
Capacity Charges Energy Charges
MPMKVVCL Annexure-I of ARR/Tariff Petition FY-18
Power Purchase cost (FY 2018) 29.17% Form No: F1
Amount in Rs. Crore
Sl No Source
Plant
Capacity
(MW)
MP's Share
in %
MP's
Share in
MW
Discom
Share in
%
Discom
Share in
MW
Energy Sent
Out (ESO)
from the
Station
MU
Purchased /
generated
(ex-bus)
Total
Capacity
Charges -
incl.
Income
Tax
(Rs Crs)
Total Capacity
Charge per unit
(Rs per MW)
Total ECR
per unit
(Rs per
unit)
Total
ECR (Rs.
Crs.)
All
Charges
Total in
Rs Crs
Average
rate
(P/kwh)
Inter-
State
Transmi
ssion
Losses
(MU)
Net energy
delivered at
MP State
periphery
(MU)
Name of Distribution Licensee : MPMKVVCL BHOPAL
Capacity Charges Energy Charges
5 SGTPS Ph-III 500.00 100.00% 500 29.17% 146 3,193 - 102.64 7,037,947.22 #DIV/0! 196 299 #DIV/0! - -
6 Shri Singaji STPS, Ph-I 1,200.00 100.00% 1,200 29.17% 350 8,289 485 372.20 10,633,615.34 1.22 59 431 8.90 - 485
7 Shri Singaji Phase-2, Unit-1 660.00 90.00% 594 29.17% 173 - - - - #DIV/0! - - #DIV/0! - -
8 Shri Singaji Phase-2, Unit-2 660.00 90.00% 594 29.17% 173 - - - - #DIV/0! - - #DIV/0! - -
9 Rani Awanti Bai Sagar, Bargi HPS 90.00 100.00% 90 29.17% 26 363 107 2.16 822,758.22 0.65 7 9 0.85 - 107
10 Bansagar Ph I HPS (Tons) 315.00 100.00% 315 29.17% 92 1,015 300 16.00 1,741,132.48 0.74 22 38 1.27 - 300
11 Bansagar Ph-II HPS (Silpara) 30.00 100.00% 30 29.17% 9 92 27 1.47 1,677,878.17 0.66 2 3 1.20 - 27
12 Bansagar Ph-III HPS (Deolond) 60.00 100.00% 60 29.17% 18 125 37 2.87 1,640,265.88 0.98 4 6 1.76 - 37
13 Bansagar Ph-IV HPS (Jhinna) 20.00 100.00% 20 29.17% 6 79 23 2.50 4,278,126.37 1.18 3 5 2.26 - 23
14 Birsinghpur HPS 20.00 100.00% 20 29.17% 6 39 6 0.95 1,628,038.57 3.98 2 3 5.66 - 6
15 Marhikheda HPS 60.00 100.00% 60 29.17% 18 60 10 4.59 2,620,248.74 1.86 2 7 6.25 - 10
16 Rajghat HPS 45.00 50.00% 23 29.17% 7 21 6 0.23 357,417.11 1.28 1 1 1.66 - 6
17 Gandhisagar HPS 115.00 50.00% 58 29.17% 17 120 36 0.88 525,628.40 1.00 4 4 1.24 - 36
18 Ranapratap Sagar & Jawahar Sagar HPS 271.00 50.00% 136 29.17% 40 230 52 - - 1.51 8 8 1.51 - 52
19 Pench HPS 160.00 66.67% 107 29.17% 31 187 55 2.61 839,549.72 0.44 2 5 0.91 - 55
C JV Hydel & Other Hydels 3,301 66.67% 2,402 29.17% 700 4,757 1,399 342.21 15,936,853 0.48 67 409 2.92 16 1,383
1 NHDC Indira Sagar HPS 1,000.00 100.00% 1,000 29.17% 292 2,143 630 169.13 5,798,439.92 0.32 20 189 3.00 - 630
2 NHDC Omkareshwar HPS 520.00 100.00% 520 29.17% 152 1,058 311 121.03 7,979,608.36 0.29 9 130 4.18 - 311
3 Sardar Sarovar HPS 1,450.00 57.00% 827 29.17% 241 1,556 459 52.04 2,158,804.85 0.82 38 90 1.95 16 442
4 Rihand HPS 300.00 15.00% 45 29.17% 13 - - - - #DIV/0! - - #DIV/0! - -
5 Matatila HPS 30.60 32.68% 10 29.17% 3 - - - - #DIV/0! - - #DIV/0! - -
D DVC 2,840 - 29.17% - 2,429 565 111.05 - 2.09 118 229 4.06 13 552
1 DVC (MTPS & CTPS) 1,840.00 0.00% - 29.17% - 2,326 548 106.69 2.09 115 221 4.04 13 535
2 DVC DTPS, Unit 1& Unit 2 1,000.00 0.00% - 29.17% - 103 17 4.36 2.17 4 8 4.67 0 17
E IPPs 9,335 3,397 29.17% 991 23,885 5,694 558.95 55,122,435 1.40 795 1,354 2.38 196 5,499
1 Torrent Power 765.00 9.80% 75 29.17% 22 275 0 19.54 8,929,934.23 4.06 0 20 3,417.28 0 0
2 BLA Power 90.00 35.00% 32 29.17% 9 63 - 1.76 1,918,865.68 #DIV/0! - 2 #DIV/0! - -
3 Jaypee Bina Power 500.00 70.00% 350 29.17% 102 2,046 225 129.09 12,644,835.60 0.93 21 150 6.66 - 225
4 Lanco Amarkantak TPS Unit 1 300.00 100.00% 300 29.17% 88 2,836 774 81.67 9,333,000.38 0.87 67 149 1.92 27 747
MPMKVVCL Annexure-I of ARR/Tariff Petition FY-18
Power Purchase cost (FY 2018) 29.17% Form No: F1
Amount in Rs. Crore
Sl No Source
Plant
Capacity
(MW)
MP's Share
in %
MP's
Share in
MW
Discom
Share in
%
Discom
Share in
MW
Energy Sent
Out (ESO)
from the
Station
MU
Purchased /
generated
(ex-bus)
Total
Capacity
Charges -
incl.
Income
Tax
(Rs Crs)
Total Capacity
Charge per unit
(Rs per MW)
Total ECR
per unit
(Rs per
unit)
Total
ECR (Rs.
Crs.)
All
Charges
Total in
Rs Crs
Average
rate
(P/kwh)
Inter-
State
Transmi
ssion
Losses
(MU)
Net energy
delivered at
MP State
periphery
(MU)
Name of Distribution Licensee : MPMKVVCL BHOPAL
Capacity Charges Energy Charges
5 Reliance UMPP, Sasan 3,960.00 37.50% 1,485 29.17% 433 11,340 3,224 48.88 1,128,570.28 1.66 534 583 1.81 115 3,109
6 Essar Power STPS 600.00 5.00% 30 29.17% 9 20 - - - #DIV/0! 2 2 #DIV/0! - -
7 Jaiprakash Power STPS, Nigri 1,320.00 37.50% 495 29.17% 144 3,489 1,017 170.43 11,803,958.08 0.74 75 245 2.41 36 981
8 MB Power STPS 1,200.00 35.00% 420 29.17% 123 2,773 454 100.44 8,198,893.80 2.11 96 196 4.32 17 437
9 Jhabua Power STPS, Unit-1 600.00 35.00% 210 29.17% 61 1,022 - 7.13 1,164,377.38 #DIV/0! - 7 #DIV/0! - -
10 Captive - - 29.17% - 20 - - #DIV/0! 1 1 #DIV/0! - -
F Renewables 3,274 3,688 29.17% 1,076 5,523 1,604 - - 5.61 900 900 5.61 - 1,604
1 Solar 1,025.25 35.00% 1,284 29.17% 375 1,324 386 - - 6.19 239 239 6.19 - 386
2 Other Mini Micro 30.00 35.00% 32 29.17% 9 12 3 - - 3.81 1 1 3.81 - 3
3 Other than Solar 2,218.38 2,371 29.17% 692 4,187 1,215 - - 5.43 660 660 5.43 - 1,215
Total 46,849 20,523 5,986 87,801 17,299 2,751.30 261,713,238 2.17 3,756 6,507 3.76 434 16,865
Revenue from sale of surplus 987
Net Costs 5,519.99
Rpo -
PP costs 5,519.99
MPPMCL Costs 100.33-
Total PP costs 5,419.66
Total Cost - Ex Bus (D+E) 5,419.66 3.13
MPMKVVCL Annexure-I of ARR/Tariff Petition FY-18
Power Purchase cost (FY 2019) 29.58% Form No: F1
Amount in Rs. Crore
Sl
No Source
Plant
Capacity
(MW)
MP's
Share in
%
MP's Share
in MW
Discom
Share in
%
Discom
Share in
MW
Energy
Sent Out
(ESO) from
the Station
MU
Purchased /
generated
(ex-bus)
Total
Capacity
Charges -
incl.
Income
Tax
(Rs Crs)
Total Capacity
Charge per unit
(Rs per MW)
Total ECR
per unit
(Rs per
unit)
Total
ECR (Rs.
Crs.)
All Charges
Total in Rs Crs
Average
rate
(P/kwh)
Inter-
State
Transmi
ssion
Losses
(MU)
Net energy
delivered at
MP State
periphery
(MU)
A Central Sector 21,514 4,856.23 29.58% 1,436.47 27,630.98 6,732.39 870.83 142,951,575.22 1.73 1,163.54 2,034.37 3 240.07 6,492.32
1 NTPC Korba 2,100.00 22.79% 478.53 29.58% 142 3,614.58 1,072 73 5,152,700.70 0.93 99.85 172.78 1.61 38.22 1,033.90
2 NTPC Korba III 500.00 16.04% 80.18 29.58% 24 611.48 181 24 9,970,613.75 1.08 19.63 43.28 2.39 6.47 174.90
3 NTPC Vindyachal I 1,260.00 35.01% 441.15 29.58% 130 3,242.96 962 77 5,900,602.88 1.63 156.79 233.79 2.43 34.29 927.60
4 NTPC Vindyachal II 1,000.00 31.65% 316.47 29.58% 94 2,308.44 685 47 5,044,620.84 1.54 105.21 152.43 2.23 24.41 660.29
5 NTPC Vindyachal III 1,000.00 24.35% 243.47 29.58% 72 1,893.94 562 56 7,720,710.75 1.53 85.71 141.32 2.52 20.03 541.73
6 NTPC Vindyachal IV 1,000.00 28.38% 283.76 29.58% 84 2,171.32 644 97 11,536,442.41 1.54 99.13 195.97 3.04 22.96 621.08
7 NTPC Vindyachal V Unit 1 500.00 28.31% 141.53 29.58% 42 1,069.30 317 48 11,502,601.51 1.55 49.11 97.27 3.07 11.31 305.86
8 NTPC Sipat I 1,980.00 17.03% 337.15 29.58% 100 2,576.09 764 101 10,116,047.88 1.22 93.15 194.04 2.54 27.24 736.85
9 NTPC Sipat II 1,000.00 18.55% 185.51 29.58% 55 1,492.19 443 54 9,839,733.09 1.43 63.09 117.09 2.65 15.78 426.82
10 NTPC Mouda I 1,000.00 18.10% 181.04 29.58% 54 1,360.66 67 72 13,423,293.25 6.37 42.55 114.43 17.13 2.70 64.10
11 NTPC Mouda II Unit 1 660.00 18.77% 123.85 29.58% 37 788.23 39 23 6,144,498.92 2.72 10.54 33.05 8.54 1.56 37.13
12 NTPC Mouda II Unit 2 660.00 18.77% 123.85 29.58% 37 788.23 39 23 6,144,498.92 2.72 10.54 33.05 8.54 1.56 37.13
13 NTPC Kawas GPP 656.20 21.36% 140.16 29.58% 41 299.29 81 27 6,406,994.39 2.26 18.27 44.83 5.55 2.89 77.89
14 NTPC Gandhar GPP 657.39 17.83% 117.19 29.58% 35 250.22 68 27 7,887,211.62 2.11 14.26 41.60 6.16 2.41 65.12
15 NTPC Kahalgaon 2 1,500.00 4.93% 73.95 29.58% 22 565.15 109 17 7,729,046.19 3.38 36.95 53.86 4.92 2.40 106.98
16 KAPP Kakrapar 440.00 25.73% 113.23 29.58% 33 347.16 103 - - 2.41 24.82 24.82 2.41 3.67 99.30
17 TAPP Tarapur 1,080.00 21.26% 229.63 29.58% 68 1,411.48 419 - - 2.95 123.30 123.30 2.95 14.93 403.73
18 NTPC Solapur STPS, Unit-1 660.00 25.15% 165.99 29.58% 49 370.02 18 26 5,252,916.43 6.47 11.75 37.54 20.67 0.73 17.43
19 NTPC Solapur STPS, Unit-2 660.00 23.03% 152.00 29.58% 45 255.29 17 18 3,957,724.76 6.47 10.76 28.56 17.17 0.67 15.96
20 NTPC Gadarwara STPS, Unit-1 800.00 50.00% 400.00 29.58% 118 1,910.26 124 55 4,610,658.46 6.65 82.73 137.29 11.03 5.03 119.45
21 NTPC Gadarwara STPS, Unit-2 800.00 50.00% 400.00 29.58% 118 - - - - #DIV/0! - - #DIV/0! - -
22 NTPC Lara STPS, Raigarh, Unit I 800.00 7.98% 63.80 29.58% 19 304.69 20 9 4,610,658.46 2.72 5.41 14.11 7.11 0.80 19.05
23 NTPC Lara STPS, Raigarh, Unit II 800.00 7.98% 63.80 29.58% 19 - - - - #DIV/0! - - #DIV/0! - -
B MP GENCO (THERMAL & HYDRO) 6,586 6,185 29.58% 1,672 26,716 4,686 1,067 77,729,512 2.70 1,264 2,330.94 4.97 - 4,686
1 Amarkantak TPS Ph-III 210.00 100.00% 210.00 29.58% 62 1,549.54 453 68 10,955,788.22 1.86 84.50 152.55 3.37 - 453.34
2 Satpura TPS Ph-II & III 830.00 100.00% 830.00 29.58% 246 4,006.44 151 112 4,562,208.69 3.60 54.36 166.37 11.02 - 150.91
3 Satpura TPS Ph-IV 500.00 100.00% 500.00 29.58% 148 2,561.00 634 206 13,936,780.99 2.50 158.50 364.62 5.75 - 634.01
4 SGTPS Ph-I & II 840.00 100.00% 840.00 29.58% 248 3,347.48 627 115 4,618,352.75 3.42 214.06 328.81 5.25 - 626.67
Name of Distribution Licensee : MPMKVVCL BHOPAL
Capacity Charges Energy Charges
MPMKVVCL Annexure-I of ARR/Tariff Petition FY-18
Power Purchase cost (FY 2019) 29.58% Form No: F1
Amount in Rs. Crore
Sl
No Source
Plant
Capacity
(MW)
MP's
Share in
%
MP's Share
in MW
Discom
Share in
%
Discom
Share in
MW
Energy
Sent Out
(ESO) from
the Station
MU
Purchased /
generated
(ex-bus)
Total
Capacity
Charges -
incl.
Income
Tax
(Rs Crs)
Total Capacity
Charge per unit
(Rs per MW)
Total ECR
per unit
(Rs per
unit)
Total
ECR (Rs.
Crs.)
All Charges
Total in Rs Crs
Average
rate
(P/kwh)
Inter-
State
Transmi
ssion
Losses
(MU)
Net energy
delivered at
MP State
periphery
(MU)
Name of Distribution Licensee : MPMKVVCL BHOPAL
Capacity Charges Energy Charges
5 SGTPS Ph-III 500.00 100.00% 500.00 29.58% 148 3,302.52 758 112 7,564,050.27 2.82 214.02 325.89 4.30 - 758.32
6 Shri Singaji STPS, Ph-I 1,200.00 100.00% 1,200.00 23.00% 276 6,585.22 748 302 10,944,895.27 4.30 321.91 623.99 8.34 - 748.46
7 Shri Singaji Phase-2, Unit-1 660.00 90.00% 594.00 23.00% 137 1,634.31 310 86 6,328,252.88 3.10 96.24 182.69 5.89 - 310.19
8 Shri Singaji Phase-2, Unit-2 660.00 90.00% 594.00 23.00% 137 812.69 128 29 2,109,417.63 3.74 47.86 76.67 5.99 - 128.00
9 Rani Awanti Bai Sagar, Bargi HPS 90.00 100.00% 90.00 29.58% 27 466.03 140 2 883,260.35 0.51 7.10 9.45 0.68 - 139.90
10 Bansagar Ph I HPS (Tons) 315.00 100.00% 315.00 29.58% 93 1,166.49 350 18 1,898,498.29 0.72 25.31 43.00 1.23 - 350.17
11 Bansagar Ph-II HPS (Silpara) 30.00 100.00% 30.00 29.58% 9 106.81 32 1 1,679,093.84 0.65 2.08 3.57 1.11 - 32.06
12 Bansagar Ph-III HPS (Deolond) 60.00 100.00% 60.00 29.58% 18 114.03 34 3 1,511,626.14 1.08 3.70 6.38 1.86 - 34.23
13 Bansagar Ph-IV HPS (Jhinna) 20.00 100.00% 20.00 29.58% 6 97.05 29 3 4,498,908.66 1.18 3.42 6.08 2.09 - 29.13
14 Birsinghpur HPS 20.00 100.00% 20.00 29.58% 6 36.18 11 1 1,620,119.37 1.57 1.71 2.67 2.46 - 10.86
15 Marhikheda HPS 60.00 100.00% 60.00 29.58% 18 110.74 33 5 2,800,875.20 1.39 4.62 9.59 2.89 - 33.24
16 Rajghat HPS 45.00 50.00% 22.50 29.58% 7 30.41 9 0 436,685.71 1.28 1.17 1.46 1.60 - 9.13
17 Gandhisagar HPS 115.00 50.00% 57.50 29.58% 17 167.69 50 1 493,265.86 0.68 3.44 4.28 0.85 - 50.34
18 Ranapratap Sagar & Jawahar Sagar HPS 271.00 50.00% 135.50 29.58% 40 370.09 111 - - 1.51 16.78 16.78 1.51 - 111.10
20 Pench HPS 160.00 66.67% 106.67 29.58% 32 251.76 76 3 887,432.11 0.43 3.27 6.07 0.80 - 75.58
C JV Hydel & Other Hydels 3,301 2,402 29.58% 710 4,644 1,378 363 16,620,241 0.55 75 438.65 3.18 15 1,363
1 NHDC Indira Sagar HPS 1,000.00 100.00% 1,000.00 29.58% 296 2,220.94 659 183 6,202,114.08 0.45 29.92 213.37 3.24 - 658.75
2 NHDC Omkareshwar HPS 520.00 100.00% 520.00 29.58% 154 1,021.06 303 127 8,260,275.17 0.42 12.59 139.65 4.61 - 302.86
3 Sardar Sarovar HPS 1,450.00 57.00% 826.50 29.58% 244 1,303.23 387 53 2,157,852.01 0.82 31.70 84.45 2.18 13.78 372.77
4 Rihand HPS 300.00 15.00% 45.00 29.58% 13 77.66 23 - - 0.40 0.92 0.92 0.40 0.82 22.21
5 Matatila HPS 30.60 32.68% 10.00 29.58% 3 21.58 6 - - 0.40 0.26 0.26 0.40 0.23 6.17
D DVC 2,840 - 29.58% - - - - #DIV/0! - - #DIV/0! - -
1 DVC (MTPS & CTPS) 1,840.00 0.00% - 29.58% - - - - #DIV/0! - - #DIV/0! - -
2 DVC DTPS, Unit 1& Unit 2 1,000.00 0.00% - 29.58% - - - - #DIV/0! - - #DIV/0! - -
E IPPs 9,352 3,414 29.58% 1,010 21,461 5,382 568 57,049,588 1.34 723 1,291.31 2.40 192 5,191
1 Torrent Power 765.00 9.80% 75.00 29.58% 22 172.96 - 20 8,978,696.41 - 19.92 #DIV/0! - -
2 BLA Power 90.00 35.00% 31.50 29.58% 9 65.29 3 3 3,296,311.28 6.60 2.11 5.19 16.18 - 3.21
3 Jaypee Bina Power 500.00 70.00% 350.00 29.58% 104 2,120.45 - 136 13,134,664.03 14.46 150.44 #DIV/0! - -
4 Lanco Amarkantak TPS Unit 1 300.00 100.00% 300.00 29.58% 89 2,104.50 624 83 9,387,185.44 1.13 70.73 154.03 2.47 22.25 601.96
MPMKVVCL Annexure-I of ARR/Tariff Petition FY-18
Power Purchase cost (FY 2019) 29.58% Form No: F1
Amount in Rs. Crore
Sl
No Source
Plant
Capacity
(MW)
MP's
Share in
%
MP's Share
in MW
Discom
Share in
%
Discom
Share in
MW
Energy
Sent Out
(ESO) from
the Station
MU
Purchased /
generated
(ex-bus)
Total
Capacity
Charges -
incl.
Income
Tax
(Rs Crs)
Total Capacity
Charge per unit
(Rs per MW)
Total ECR
per unit
(Rs per
unit)
Total
ECR (Rs.
Crs.)
All Charges
Total in Rs Crs
Average
rate
(P/kwh)
Inter-
State
Transmi
ssion
Losses
(MU)
Net energy
delivered at
MP State
periphery
(MU)
Name of Distribution Licensee : MPMKVVCL BHOPAL
Capacity Charges Energy Charges
5 Reliance UMPP, Sasan 3,960.00 37.50% 1,485.00 29.58% 439 10,839.97 3,215 50 1,131,279.88 1.39 448.19 497.88 1.55 114.62 3,100.62
6 Essar Power STPS 600.00 5.00% 30.00 29.58% 9 20.01 1 - - 6.48 0.64 0.64 6.48 - 0.98
7 Jaiprakash Power STPS, Nigri 1,320.00 37.50% 495.00 29.58% 146 3,211.40 953 174 11,879,322.91 0.77 73.27 247.21 2.60 33.96 918.57
8 MB Power STPS 1,200.00 35.00% 420.00 29.58% 124 2,147.50 580 90 7,241,910.15 1.92 111.28 201.25 3.47 20.72 558.85
9 Jhabua Power STPS, Unit-1 600.00 35.00% 210.00 29.58% 62 744.97 - 12 2,000,218.32 #DIV/0! - 12.42 #DIV/0! - -
10 Captive 17.00 100.00% 17.00 29.58% 5 34.28 7 - - 3.51 2.33 2.33 3.51 - 6.64
F Renewables 3,688 - 29.58% - 5,980 1,774 - - 5.53 981 980.63 5.53 - 1,774
1 Solar 1,283.95 - - 29.58% - 1,635.91 485 - 5.95 288.72 288.72 5.95 - 485.22
2 Other Mini Micro 32.23 - - 29.58% - 35.00 10 - 3.81 3.96 3.96 3.81 - 10.38
3 Other than Solar 2,371.40 - - 29.58% - 4,308.96 1,278 - 5.38 687.95 687.95 5.38 - 1,278.08
Total 47,279.77 16,856.40 29.58% 4,828.97 86,433.13 19,951.69 2,869.30 294,350,917.15 2.11 4,206.60 7,075.90 3.55 446.44 19,505.24
Revenue from sale of surplus 617.03
Net Costs 6,458.87
Rpo 23.67
PP costs 6,482.54
MPPMCL Costs 117.82-
Total PP costs 6,364.72
Total Cost - Ex Bus (D+E) 6,364.72 3.19
MPMKVVCL Annexure-I of ARR/Tariff Petition FY-18
Month-wise Power Procurenent details Form No: F1a
Power purchase figures in MU
Source / Station Apr-16 May-16 Jun-16 Jul-16 Aug-16 Sep-16 Oct-16 Nov-16 Dec-16 Jan-17 Feb-17 Mar-17 Total
A Central Sector 530 448 531 383 270 500 430 569 595 546 519 587 5,909
1 NTPC Korba 93 96 102 73 53 100 95 101 79 103 95 97 1,087
2 NTPC Korba III 16 17 17 16 10 17 16 17 18 17 16 16 194
3 NTPC Vindyachal I 61 28 61 25 13 48 42 61 73 54 63 74 603
4 NTPC Vindyachal II 59 36 55 19 8 46 44 70 60 59 61 66 583
5 NTPC Vindyachal III 50 42 51 39 19 37 21 48 54 46 48 50 507
6 NTPC Vindyachal IV 51 33 59 34 15 43 37 59 59 43 50 55 537
7 NTPC Vindyachal V Unit 1 29 24 31 21 9 26 24 27 32 24 3 26 277
8 NTPC Sipat I 65 75 72 57 62 74 55 71 77 76 63 71 818
9 NTPC Sipat II 38 40 42 44 20 43 40 41 42 42 39 40 472
10 NTPC Mouda I 2 1 4 1 0 4 1 2 12 4 5 8 43
11 NTPC Mouda II Unit 1 - - - - - - - - - - 3 5 8
12 NTPC Mouda II Unit 2 - - - - - - - - - - - - -
13 NTPC Kawas GPP 2 2 4 1 0 1 0 11 15 10 11 11 68
14 NTPC Gandhar GPP 4 2 3 1 0 2 3 13 14 11 10 13 76
15 NTPC Kahalgaon 2 14 10 5 2 3 5 4 4 9 6 6 5 73
16 KAPP Kakrapar - - - - - - - - - - - - -
17 TAPP Tarapur 46 43 24 51 56 54 47 44 51 51 46 50 563
18 NTPC Solapur STPS, Unit-1 - - - - - - - - - - - - -
19 NTPC Solapur STPS, Unit-2 - - - - - - - - - - - - -
20 NTPC Gadarwara STPS, Unit-1 - - - - - - - - - - - - -
21 NTPC Gadarwara STPS, Unit-2 - - - - - - - - - - - - -
22 NTPC Lara STPS, Raigarh, Unit I - - - - - - - - - - - - -
23 NTPC Lara STPS, Raigarh, Unit II - - - - - - - - - - - - -
B MP GENCO 472 356 222 164 229 445 507 558 671 581 482 423 5,110
1 Amarkantak TPS Ph-III 40 42 42 18 4 28 41 36 45 45 40 40 420
2 Satpura TPS Ph-II & III 102 17 - 1 5 31 40 31 47 32 30 9 344
3 Satpura TPS Ph-IV 80 47 25 5 - 31 73 98 77 71 65 86 659
4 SGTPS Ph-I & II 111 86 50 1 9 88 52 52 115 112 114 94 885
Months in the Financial Year: 2017
Name of Distribution Licensee : MPMKVVCL BHOPAL
Sl No
MPMKVVCL Annexure-I of ARR/Tariff Petition FY-18
Month-wise Power Procurenent details Form No: F1a
Power purchase figures in MU
Source / Station Apr-16 May-16 Jun-16 Jul-16 Aug-16 Sep-16 Oct-16 Nov-16 Dec-16 Jan-17 Feb-17 Mar-17 Total
Months in the Financial Year: 2017
Name of Distribution Licensee : MPMKVVCL BHOPAL
Sl No
5 SGTPS Ph-III 95 88 89 86 79 100 95 75 98 92 80 93 1,070
6 Shri Singaji STPS, Ph-I 21 52 - - - 27 62 160 187 129 71 28 737
7 Shri Singaji Phase-2, Unit-1 - - - - - - - - - - - - -
8 Shri Singaji Phase-2, Unit-2 - - - - - - - - - - - - -
9 Rani Awanti Bai Sagar, Bargi HPS 8 9 5 9 21 22 22 15 12 10 8 8 150
10 Bansagar Ph I HPS (Tons) 9 9 4 28 52 65 59 44 41 39 32 32 416
11 Bansagar Ph-II HPS (Silpara) 1 1 1 0 0 4 3 5 4 4 3 3 29
12 Bansagar Ph-III HPS (Deolond) (0) (0) (0) (0) 7 12 6 (0) (0) (0) (0) 1 25
13 Bansagar Ph-IV HPS (Jhinna) 1 1 0 0 0 0 4 5 5 5 4 4 28
14 Birsinghpur HPS - - 1 3 5 3 2 0 0 0 0 - 14
15 Marhikheda HPS (0) (0) (0) 5 16 5 7 3 5 3 3 2 50
16 Rajghat HPS (0) (0) (0) 2 2 (0) (0) 1 2 2 1 (0) 10
17 Gandhisagar HPS 1 3 4 (0) 4 2 2 3 8 11 10 9 57
18 Ranapratap Sagar & Jawahar Sagar HPS 0 0 0 1 18 6 12 20 20 19 16 11 124
19 Pench HPS 2 1 1 4 7 21 27 8 5 7 5 2 90
C JV Hydel & Other Hydel 61 79 54 346 553 260 269 132 114 135 126 89 2,217
1 NHDC Indira Sagar HPS 38 48 17 177 261 112 113 75 68 83 70 50 1,112
2 NHDC Omkareshwar HPS 21 25 10 77 104 49 49 31 28 35 30 24 483
3 Sardar Sarovar HPS 3 7 26 92 188 99 107 25 18 16 26 15 622
4 Rihand HPS - - - - - - - - - - - - -
5 Matatila HPS - - - - - - - - - - - - -
D DVC 68 63 74 11 2 19 41 65 72 61 48 56 580
1 DVC (MTPS & CTPS) 62 61 65 9 2 19 40 64 63 50 39 46 519
2 DVC DTPS, Unit 1& Unit 2 6 3 8 2 0 0 1 1 9 11 9 11 61
E IPPs 451 488 479 420 263 372 398 522 451 484 476 409 5,213
1 Torrent Power - - - - - - - - - - - 0 0
2 BLA Power 2 1 1 0 0 1 - - - 0 - - 5
3 Jaypee Bina Power - 1 - - - 6 2 8 9 3 16 6 52
4 Lanco Amarkantak TPS Unit 1 57 58 60 49 15 46 45 48 57 47 54 59 596
MPMKVVCL Annexure-I of ARR/Tariff Petition FY-18
Month-wise Power Procurenent details Form No: F1a
Power purchase figures in MU
Source / Station Apr-16 May-16 Jun-16 Jul-16 Aug-16 Sep-16 Oct-16 Nov-16 Dec-16 Jan-17 Feb-17 Mar-17 Total
Months in the Financial Year: 2017
Name of Distribution Licensee : MPMKVVCL BHOPAL
Sl No
5 Reliance UMPP, Sasan 290 278 296 281 161 202 237 321 299 320 301 269 3,253
6 Essar Power STPS - - - - - - - - - - - - -
7 Jaiprakash Power STPS, Nigri 82 101 95 84 84 104 98 100 58 88 82 52 1,028
8 MB Power STPS 21 41 27 6 4 14 16 45 28 26 22 23 273
9 Jhabua Power STPS, Unit-1 - 7 0 - - - - - - - - - 7
10 Captive - - - - - - - - - - - - -
F Renewables 113 180 183 173 193 150 78 50 55 74 92 37 1,378
1 Solar 26 27 23 18 16 51 26 25 26 24 23 26 311
2 Other Mini Micro - - - - - 0 0 1 1 1 1 - 3
3 Other than Solar 87 152 160 155 177 99 51 25 29 49 68 12 1,064
Total 1,696 1,615 1,543 1,495 1,511 1,746 1,722 1,896 1,959 1,880 1,743 1,601 20,407
MPMKVVCL Annexure-I of ARR/Tariff Petition FY-18
Month-wise Power Procurenent details Form No: F1a
Power purchase figures in MU
Source / Station Apr-17 May-17 Jun-17 Jul-17 Aug-17 Sep-17 Oct-17 Nov-17 Dec-17 Jan-18 Feb-18 Mar-18 Total
Central Sector 494 506 486 497 516 280 469 549 532 528 485 504 5,845
1 NTPC Korba 85 90 89 101 91 99 99 92 92 91 81 92 1,102
2 NTPC Korba III 14 15 31 4 17 15 15 14 14 14 13 14 182
3 NTPC Vindyachal I 75 76 65 55 74 - - 70 70 70 62 55 673
4 NTPC Vindyachal II 58 53 29 58 68 - 57 53 53 53 47 54 584
5 NTPC Vindyachal III 46 47 45 48 53 - 49 45 45 45 40 46 509
6 NTPC Vindyachal IV 31 56 54 50 36 - 47 52 52 52 46 53 530
7 NTPC Vindyachal V Unit 1 25 27 23 26 31 - 27 25 25 25 22 25 282
8 NTPC Sipat I 60 45 63 75 74 67 67 63 63 62 56 63 759
9 NTPC Sipat II 35 36 36 41 38 38 38 35 35 35 31 36 435
10 NTPC Mouda I 5 9 6 5 - - - 32 32 32 28 - 149
11 NTPC Mouda II Unit 1 - - 0 - - - - - - - - - 0
12 NTPC Mouda II Unit 2 - - - - - - - - - - - - -
13 NTPC Kawas GPP 9 10 9 11 10 8 8 8 8 8 7 8 103
14 NTPC Gandhar GPP 10 13 8 13 14 7 7 6 6 6 6 7 104
15 NTPC Kahalgaon 2 5 5 7 3 11 - 10 9 9 9 8 9 87
16 KAPP Kakrapar - - - - - - - - - - - - -
17 TAPP Tarapur 36 22 21 6 - 45 45 42 26 26 37 42 346
18 NTPC Solapur STPS, Unit-1 - - - - - - - - - - - - -
19 NTPC Solapur STPS, Unit-2 - - - - - - - - - - - - -
20 NTPC Gadarwara STPS, Unit-1 - - - - - - - - - - - - -
21 NTPC Gadarwara STPS, Unit-2 - - - - - - - - - - - - -
22 NTPC Lara STPS, Raigarh, Unit I - - - - - - - - - - - - -
23 NTPC Lara STPS, Raigarh, Unit II - - - - - - - - - - - - -
MP GENCO 88 153 174 250 77 204 176 278 335 163 149 145 2,191
1 Amarkantak TPS Ph-III 37 40 28 43 - - - - - - - - 148
2 Satpura TPS Ph-II & III 5 7 - - 52 94 94 87 87 87 77 88 677
Months in the Financial Year: 2018
Name of Distribution Licensee : MPMKVVCL BHOPAL
Sl No
MPMKVVCL Annexure-I of ARR/Tariff Petition FY-18
Month-wise Power Procurenent details Form No: F1a
Power purchase figures in MU
Source / Station Apr-17 May-17 Jun-17 Jul-17 Aug-17 Sep-17 Oct-17 Nov-17 Dec-17 Jan-18 Feb-18 Mar-18 Total
Months in the Financial Year: 2018
Name of Distribution Licensee : MPMKVVCL BHOPAL
Sl No
3 Satpura TPS Ph-IV 10 5 76 77 - - - - - - - - 168
4 SGTPS Ph-I & II - - 21 34 - - - - - - - - 55
5 SGTPS Ph-III - - - - - - - - - - - - -
6 Shri Singaji STPS, Ph-I - 82 16 54 - - - 121 183 12 16 - 485
7 Shri Singaji Phase-2, Unit-1 - - - - - - - - - - - - -
8 Shri Singaji Phase-2, Unit-2 - - - - - - - - - - - - -
9 Rani Awanti Bai Sagar, Bargi HPS 6 5 5 4 (0) 22 14 11 11 10 9 9 107
10 Bansagar Ph I HPS (Tons) 23 6 15 26 21 52 34 28 26 25 22 23 300
11 Bansagar Ph-II HPS (Silpara) 2 1 2 1 0 5 3 3 3 3 2 2 27
12 Bansagar Ph-III HPS (Deolond) 2 3 6 3 (0) 6 4 3 3 3 2 3 37
13 Bansagar Ph-IV HPS (Jhinna) 2 1 1 1 1 4 3 2 2 2 2 2 23
14 Birsinghpur HPS - - 0 2 - - - 1 1 1 1 - 6
15 Marhikheda HPS (0) (0) (0) (0) (0) - - 2 2 2 2 2 10
16 Rajghat HPS (0) (0) (0) (0) (0) 2 1 1 1 1 1 1 6
17 Gandhisagar HPS 0 0 2 3 0 8 5 4 4 4 3 3 36
18 Ranapratap Sagar & Jawahar Sagar HPS 0 0 0 1 2 - 11 9 8 8 7 7 52
19 Pench HPS 1 3 1 2 1 12 8 6 6 6 5 5 55
JV Hydel & Other Hydel 72 84 113 39 19 269 174 141 131 130 112 117 1,399
1 NHDC Indira Sagar HPS 36 45 45 22 6 119 77 62 58 58 50 52 630
2 NHDC Omkareshwar HPS 18 22 23 13 7 57 37 30 28 28 24 25 311
3 Sardar Sarovar HPS 18 17 45 4 5 93 60 49 45 45 39 40 459
4 Rihand HPS - - - - - - - - - - - - -
5 Matatila HPS - - - - - - - - - - - - -
DVC 53 59 33 40 54 58 58 54 54 54 48 - 565
1 DVC (MTPS & CTPS) 41 53 33 40 54 58 58 54 54 54 48 - 548
2 DVC DTPS, Unit 1& Unit 2 12 6 - - - - - - - - - - 17
IPPs 448 455 424 425 628 364 451 536 535 532 474 422 5,694
MPMKVVCL Annexure-I of ARR/Tariff Petition FY-18
Month-wise Power Procurenent details Form No: F1a
Power purchase figures in MU
Source / Station Apr-17 May-17 Jun-17 Jul-17 Aug-17 Sep-17 Oct-17 Nov-17 Dec-17 Jan-18 Feb-18 Mar-18 Total
Months in the Financial Year: 2018
Name of Distribution Licensee : MPMKVVCL BHOPAL
Sl No
1 Torrent Power - - - - 0 - - - - - - - 0
2 BLA Power - - - - - - - - - - - - -
3 Jaypee Bina Power 15 21 13 6 1 - - 44 44 43 39 - 225
4 Lanco Amarkantak TPS Unit 1 53 50 36 35 236 56 56 52 52 51 46 52 774
5 Reliance UMPP, Sasan 271 252 249 298 255 216 303 283 282 280 250 284 3,224
6 Essar Power STPS - - - - - - - - - - - - -
7 Jaiprakash Power STPS, Nigri 88 93 90 45 98 92 92 86 86 85 76 86 1,017
8 MB Power STPS 21 40 35 41 37 - - 72 72 72 64 - 454
9 Jhabua Power STPS, Unit-1 - - - - - - - - - - - - -
10 Captive - - - - - - - - - - - - -
Renewables 124 115 56 16 1 198 197 184 183 182 162 185 1,604
1 Solar 25 25 25 13 - 45 45 42 42 42 37 42 386
2 Other Mini Micro 0 - - - - 1 1 0 0 0 0 0 3
3 Other than Solar 98 89 31 3 1 152 151 141 141 140 125 142 1,215
Total 1,278 1,372 1,287 1,266 1,293 1,373 1,525 1,742 1,770 1,589 1,430 1,373 17,299
MPMKVVCL Annexure-I of ARR/Tariff Petition FY-18
Month-wise Power Procurenent details Form No: F1a
Power purchase figures in MU
Source / Station Apr-18 May-18 Jun-18 Jul-18 Aug-18 Sep-18 Oct-18 Nov-18 Dec-18 Jan-19 Feb-19 Mar-19 Total
- Central Sector 499 537 513 552 554 560 575 699 697 532 474 540 6,732
1 NTPC Korba 82 89 87 94 97 95 95 89 89 88 78 89 1,072
2 NTPC Korba III 14 15 15 16 16 16 16 15 15 15 13 15 181
3 NTPC Vindyachal I 74 80 78 84 87 85 85 80 80 79 70 80 962
4 NTPC Vindyachal II 53 57 56 60 62 61 61 57 57 56 50 57 685
5 NTPC Vindyachal III 43 47 46 49 51 50 50 47 46 46 41 47 562
6 NTPC Vindyachal IV 50 53 52 56 58 57 57 53 53 53 47 54 644
7 NTPC Vindyachal V Unit 1 24 26 26 28 29 28 28 26 26 26 23 26 317
8 NTPC Sipat I 59 63 62 67 69 68 68 63 63 63 56 64 764
9 NTPC Sipat II 34 37 36 39 40 39 39 37 37 36 32 37 443
10 NTPC Mouda I - - - - - - - 33 33 - - - 67
11 NTPC Mouda II Unit 1 - - - - - - - 19 19 - - - 39
12 NTPC Mouda II Unit 2 - - - - - - - 19 19 - - - 39
13 NTPC Kawas GPP 7 7 7 8 - 8 8 7 7 7 6 7 81
14 NTPC Gandhar GPP 6 6 6 6 - 7 7 6 6 6 5 6 68
15 NTPC Kahalgaon 2 13 14 - - - - 15 14 14 14 12 14 109
16 KAPP Kakrapar 8 9 8 9 9 9 9 9 9 8 8 9 103
17 TAPP Tarapur 32 35 34 37 38 37 37 35 35 34 31 35 419
18 NTPC Solapur STPS, Unit-1 - - - - - - - 9 9 - - - 18
19 NTPC Solapur STPS, Unit-2 - - - - - - - 8 8 - - - 17
20 NTPC Gadarwara STPS, Unit-1 - - - - - - - 62 62 - - - 124.48
21 NTPC Gadarwara STPS, Unit-2 - - - - - - - - - - - - -
22 NTPC Lara STPS, Raigarh, Unit I - - - - - - - 10 10 - - - 20
23 NTPC Lara STPS, Raigarh, Unit II - - - - - - - - - - - - -
- MP GENCO 281 309 204 111 173 299 455 631 669 623 571 360 4,685.64
1 Amarkantak TPS Ph-III 35 38 37 40 35 41 41 38 38 38 34 38 453.34
Months in the Financial Year: 2019
Name of Distribution Licensee : MPMKVVCL BHOPAL
Sl
No
MPMKVVCL Annexure-I of ARR/Tariff Petition FY-18
Month-wise Power Procurenent details Form No: F1a
Power purchase figures in MU
Source / Station Apr-18 May-18 Jun-18 Jul-18 Aug-18 Sep-18 Oct-18 Nov-18 Dec-18 Jan-19 Feb-19 Mar-19 Total
Months in the Financial Year: 2019
Name of Distribution Licensee : MPMKVVCL BHOPAL
Sl
No
2 Satpura TPS Ph-II & III - - - - - - - 55 96 - - - 150.91
3 Satpura TPS Ph-IV 58 63 62 9 - 67 67 63 63 62 56 63 634.01
4 SGTPS Ph-I & II 61 77 - - - - 88 82 82 82 73 83 626.67
5 SGTPS Ph-III 75 81 60 - - 59 87 81 81 80 72 82 758.32
6 Shri Singaji STPS, Ph-I - - - - - - 85 162 161 160 143 36 748.46
7 Shri Singaji Phase-2, Unit-1 - - - - - - - 80 80 79 71 - 310.19
8 Shri Singaji Phase-2, Unit-2 - - - - - - - - 3 57 68 - 128.00
9 Rani Awanti Bai Sagar, Bargi HPS 8 8 7 10 22 21 14 11 10 10 9 9 139.90
10 Bansagar Ph I HPS (Tons) 20 20 18 25 55 53 34 28 26 26 22 23 350.17
11 Bansagar Ph-II HPS (Silpara) 2 2 2 2 5 5 3 3 2 2 2 2 32.06
12 Bansagar Ph-III HPS (Deolond) 2 2 2 2 5 5 3 3 3 3 2 2 34.23
13 Bansagar Ph-IV HPS (Jhinna) 2 2 1 2 5 4 3 2 2 2 2 2 29.13
14 Birsinghpur HPS 1 1 1 1 2 2 1 1 1 1 1 1 10.86
15 Marhikheda HPS 2 2 2 2 5 5 3 3 2 2 2 2 33.24
16 Rajghat HPS 1 1 0 1 1 1 1 1 1 1 1 1 9.13
17 Gandhisagar HPS 3 3 3 4 8 8 5 4 4 4 3 3 50.34
18 Ranapratap Sagar & Jawahar Sagar HPS 6 6 6 8 17 17 11 9 8 8 7 7 111.10
19 Pench HPS 4 4 4 5 12 11 7 6 6 6 5 5 75.58
- JV Hydel & Other Hydel 106 114 112 121 124 122 122 114 114 113 101 115 1,377.59
1 NHDC Indira Sagar HPS 51 55 54 58 59 58 58 55 54 54 48 55 658.75
2 NHDC Omkareshwar HPS 23 25 25 26 27 27 27 25 25 25 22 25 302.86
3 Sardar Sarovar HPS 30 32 31 34 35 34 34 32 32 32 28 32 386.55
4 Rihand HPS 2 2 2 2 2 2 2 2 2 2 2 2 23.04
5 Matatila HPS 0 1 1 1 1 1 1 1 1 1 0 1 6.40
- DVC - - - - - - - - - - - - -
1 DVC (MTPS & CTPS) - - - - - - - - - - - - -
MPMKVVCL Annexure-I of ARR/Tariff Petition FY-18
Month-wise Power Procurenent details Form No: F1a
Power purchase figures in MU
Source / Station Apr-18 May-18 Jun-18 Jul-18 Aug-18 Sep-18 Oct-18 Nov-18 Dec-18 Jan-19 Feb-19 Mar-19 Total
Months in the Financial Year: 2019
Name of Distribution Licensee : MPMKVVCL BHOPAL
Sl
No
2 DVC DTPS, Unit 1& Unit 2 - - - - - - - - - - - -
- IPPs 419 450 441 475 432 481 483 453 452 447 398 453 5,382.37
1 Torrent Power - - - - - - - - - - - - -
2 BLA Power - - - - - - - 2 2 - - - 3.21
3 Jaypee Bina Power - - - - - - - - - - - - -
4 Lanco Amarkantak TPS Unit 1 48 52 51 55 56 55 55 52 52 51 46 52 624.22
5 Reliance UMPP, Sasan 247 266 261 281 290 285 285 266 266 264 235 268 3,215.24
6 Essar Power STPS - - - - - - - 0 0 - - - 0.98
7 Jaiprakash Power STPS, Nigri 73 79 77 83 86 84 85 79 79 78 70 79 952.53
8 MB Power STPS 49 53 52 56 - 56 57 53 53 52 47 53 579.57
9 Jhabua Power STPS, Unit-1 - - - - - - - - - - - - -
10 Captive 1 1 - - - - 1 1 1 1 1 1 6.64
- Renewables 136 147 144 155 160 157 157 147 147 146 130 148 1,773.69
1 Solar 37 40 39 42 44 43 43 40 40 40 36 40 485.22
2 Other Mini Micro 1 1 1 1 1 1 1 1 1 1 1 1 10.38
3 Other than Solar 98 106 104 112 115 113 113 106 106 105 94 106 1,278.08
- Total 1,441 1,557 1,414 1,414 1,443 1,620 1,792 2,044 2,078 1,861 1,674 1,614 19,951.69
MPMKVVCL Annexure-I of ARR/Tariff Petition FY-18
Name of Distribution Licensee : MPMKVVCL BHOPAL
Intra State Transmission (MPTRANSCO) Charges - excluding SLDC charges Form No: F1c
Amount in Rs. Crore
YearContracted Capacity
(MW)
Monthly Transmission
Charge (Rs/MW) Total charges (Rs.Crs.)
1 FY16 2,750.15 2,636,463 725.07
2 FY17 4,766.10 1,978,284 942.87
3 FY18 4,859.94 1,631,851 793.07
4 FY19 5,174.34 1,665,217 861.64
MPMKVVCL Annexure-I of ARR/Tariff Petition FY-18
Name of Distribution Licensee : MPMKVVCL BHOPAL
Intra-state Inter Discom UI Charges details
Form No: F1d
Month
Scheduled
Energy at Ex-
Bus
Scheduled
Energy at
Discom
periphery
Actual Drawl at
Discom
periphery
UI
Charges
Adjusted
UICap Amount
Additional
UINet UI
OAC
Embeded
to EZ
Difference of
scheduled and
drawl energy
April 1,695.85 1546.78 1551.61 9.79 10.38 0.04 0.30 10.72 0 (4.83)
May 1,614.58 1538.81 1523.06 12.06 14.24 0.17 1.15 15.56 0 15.74
June 1,542.90 1479.53 1384.96 4.80 6.37 1.50 0.53 8.40 0 94.56
July 1,494.87 1447.07 1304.30 7.96 8.65 0.45 0.90 10.00 0 142.76
Aug 1,510.67 1410.84 1298.70 13.72 13.43 0.09 1.41 14.92 0 112.14
Sept 1,746.08 1600.80 1577.39 11.38 9.60 0.13 1.10 10.83 0 23.41
Oct 1,722.40 1595.35 1610.95 6.49 4.58 0.21 0.35 5.14 0 (15.59)
Nov 1,895.96 1,806.44 1,966.68 2.64 1.01 0.72 0.54 2.27 0 (160.23)
Dec 1,959.27 1,865.94 2,035.06 (4.25) (3.53) 2.03 0.26 (1.24) 0 (169.12)
Jan 1,880.09 1,777.48 1,929.13 (4.94) (4.73) 2.66 0.43 (1.64) 0 (151.65)
Feb 1,743.27 1,654.50 1,665.69 (0.93) (0.99) 1.09 0.56 0.66 0 (11.19)
March 1,601.30 1,553.96 1,599.88 (11.31) (11.36) 3.38 0.10 (7.88) 0 (45.92)
Total 20,407.24 19,277.51 19,447.42 47.41 47.65 12.47 7.63 67.74 0 (169.91)
FY 2016-17
MPMKVVCL Annexure-I of ARR/Tariff Petition FY-18
Name of Distribution Licensee : MPMKVVCL BHOPAL
Inter State Transmission Charges Form No: F1e
Month
Contracted
Capacity
(MW)
Total
Transmissi
on/PoC
charges
(Rs.Crs.)
Contracted
Capacity
(MW)
Total
Transmissi
on/PoC
charges
(Rs.Crs.)
Contracted
Capacity
(MW)
Total
Transmissi
on/PoC
charges
(Rs.Crs.)
Contracted
Capacity
(MW)
Total
Transmissio
n/PoC
charges
(Rs.Crs.)
Contracted
Capacity
(MW)
Total
Transmissi
on/PoC
charges
(Rs.Crs.)
Contracted
Capacity
(MW)
Total
Transmissio
n/PoC
charges
(Rs.Crs.)
April 34.41 31.18 30.89 40.09 42.77 50.22
May 34.58 31.34 31.04 38.33 43.54 54.04
June 36.23 32.84 32.52 42.31 41.79 52.31
July 38.21 34.63 34.30 34.50 41.10 56.33
August 37.72 34.18 33.86 27.62 51.46 54.21
September 37.93 34.37 34.05 37.55 34.06 57.07
October 37.63 34.10 33.78 37.16 44.49 57.91
November 43.14 39.09 38.72 44.76 49.02 62.65
December 40.64 36.83 36.48 43.02 48.11 62.51
January 40.41 36.62 36.27 42.14 47.80 53.59
February 39.72 36.00 35.66 40.15 43.14 47.78
March 46.77 42.39 41.99 40.52 41.42 54.34
Total 467.40 423.57 419.56 468.17 528.70 662.95
FY17 FY18 FY19FY14 FY15 FY16
MPMKVVCL Annexure-I of ARR/Tariff Petition FY-18
Name of Distribution Licensee : MPMKVVCL BHOPAL
SLDC Charges Form No: F1f
Amount in Rs. Crore
1 FY16 5,054.43 6,674.96 3.37
2 FY17 4,766.10 5,497.16 2.62
3 FY18 4,859.94 6,279.50 3.05
4 FY19 5,174.34 5,897.95 3.05
Sl.No. YearContracted Capacity
(MW)
Monthly
Transmission
Charge (Rs/MW)
Total charges
(Rs.Crs.)
MPMKVVCL Annexure-I of ARR/Tariff Petition FY-18
MPMKVVCL BHOPAL
Gross Fixed Assets Form F2
Amount in Rs. Crore
Sl.No Particulars
Addition
During
Year
Adjustment
s &
Deduction
& assets
not in use
At End Of
Year
Addition
During
Year
Adjustment
s &
Deduction
& assets
not in use
At End Of
Year
Addition
During
Year
Adjustment
s &
Deduction
& assets
not in use
At End Of
Year
1 Land & Land rights - - 7.96 - - 7.96 - - 7.96
Leasehold land - - - - -
2 Building and Civil Works 2.12 - 101.82 2.12 - 103.94 2.12 - 106.06
3 Hydraulic Works - - 9.55 - - 9.55 - - 9.55
4 Other Civil Works - - 5.69 - - 5.69 - - 5.69
5 Plant & Machinery 127.61 - 2,300.32 133.99 - 2,434.31 136.67 - 2,570.98
6 Line Cable Networks etc. 263.73 - 2,856.10 269.00 - 3,125.11 282.45 - 3,407.56
7 Vehicles - - 0.47 - - 0.47 - - 0.47
8 Furniture & fixtures 0.13 - 1.86 0.13 - 1.99 0.13 - 2.12
9 Office Equipments 13.55 - 118.03 14.23 - 132.26 14.37 - 146.63
10 Capital stores and spares 17.65 - 150.39 18.00 - 168.39 18.18 - 186.57
11 Supervision assets 32.49 - 326.08 32.81 - 358.90 33.47 - 392.37
12 RGGVY Assets 261.80 - 756.13 267.04 - 1,023.17 269.71 - 1,292.88
Total (1 to 12) 719.08 - 6,634.42 737.33 - 7,371.75 757.11 - 8,128.85
FY18 FY19FY17
MPMKVVCL Annexure-I of ARR/Tariff Petition FY-18
MPMKVVCL BHOPAL
Depreciation and provision for depreciation Form F2a
Amount in Rs. Crore
Sl.No Particulars Additions WithdrawalsClosing balance
of depreciation
1 Land & Land rights - - -
Leasehold land 0.00 0.00
2 Building and Civil Works 1.97 - 1.97
3 Hydraulic Works 0.30 - 0.30
4 Other Civil Works 0.12 - 0.12
5 Plant & Machinery 86.99 - 86.99
6 Line Cable Networks etc. 109.76 - 109.76
7 Vehicles 0.13 - 0.13
8 Furniture & fixtures 0.14 - 0.14
9 Office Equipments 7.42 - 7.42
10 Capital stores and spares 12.78 - 12.78
11 Supervision assets 11.02 11.02
12 RGGVY Assets 17.07 - 17.07
Depreciation expenses -
Total (1 to 13) 247.69 0.00 247.69
Depreciation capitalised - - 0.12-
Net depreciation (14-15) 247.69 0.00 247.81
FY16
MPMKVVCL Annexure-I of ARR/Tariff Petition FY-18
MPMKVVCL BHOPAL
Depreciation and provision for depre
Sl.No Particulars
1 Land & Land rights
Leasehold land
2 Building and Civil Works
3 Hydraulic Works
4 Other Civil Works
5 Plant & Machinery
6 Line Cable Networks etc.
7 Vehicles
8 Furniture & fixtures
9 Office Equipments
10 Capital stores and spares
11 Supervision assets
12 RGGVY Assets
Depreciation expenses
Total (1 to 13)
Depreciation capitalised
Net depreciation (14-15)
Form F2a
s. Crore Amount in Rs. Crore
AdditionsWithdraw
als
Closing
balance of
depreciation
AdditionsWithdraw
als
Closing
balance of
depreciation
AdditionsWithdraw
als
Closing
balance of
depreciation
- - - - - - - - -
0.00 - -
2.17 - 4.14 2.17 - 6.31 2.17 - 8.48
0.12 - 0.42 0.12 - 0.54 0.12 - 0.66
95.43 - 95.55 47.78 - 143.33 71.60 - 214.93
0.29 - 87.28 0.29 - 87.57 0.29 - 87.86
117.85 - 227.61 120.21 - 347.82 126.22 - 474.03
- - - - - - - -
0.14 - 0.28 0.14 - 0.42 0.14 - 0.56
7.94 - 15.36 8.10 - 23.46 8.10 - 31.56
14.48 27.25 14.48 14.48
12.12 23.14 11.57 11.57
20.00 - 37.07 18.54 - 55.61 19.27 - 74.87
270.54 0.00 518.10 223.38 0.00 665.04 253.95 0.00 892.95
- - 0.12- - - 0.12- - - 0.12-
270.54 0.00 518.22 223.38 0.00 665.16 253.95 0.00 893.07
FY18 FY19FY17
MPMKVVCL Annexure-I of ARR/Tariff Petition FY-18
Name of Distribution Licensee : MPMKVVCL BHOPAL
Investment Plan - Master
For wheeling activity + Retail supply
Internal
Accrual
(from free
reserves and
surplus)
Equity
infused
Loan
Amount
(Rs. Crores)
Loan
Agency
SYSTEM STRENGTHING 2.1, 2.2, 2,3 Yes - 16.24 47.02
FEEDER SEPERATION 6.1, 6.2, 6.3 Yes 99.48 - 0.00 184.62 REC
NEW PUMP CONNECTION &
MMSKPY5.1, 5.2, 5.3 Yes 99.48 - 164.97 - - -
ADB-II 2.1, 2.2, 2,3 Yes - - - 13.64 ADB
ADB-III - - 48.78
RGGVY 5.1, 5.2, 5.3 Yes 198.96 - - 10.89 REC 98.05
RAPDRP PART A 1.1, 1.2, 1.3 Yes - - - - PFC
RAPDRP PART B 4.1, 4.2, 4.3 Yes - - - 49.55 REC &
PFC
HUDCO 1.1, 1.2, 1.3 Yes - -
IPDS 149.22 - 15.75 GOMP 29.18
DDUGJY 198.96 - - - - -
GROSS TOTAL 994.81 - 181.21 370.25 - 127.23
Project Details
Name of schemeNature of
Project
Whether
scheme part
of approved
Business
Plan?
2016-17
Total
capital
expenditur
e approved
by MPERC
(Rs. Crs.)
SOURCE OF FINANCING FOR SCHEME
Equity component Debt Component
Capital
Subsidies /
grants
component
Consumer
Contribution
component
MPMKVVCL Annexure-I of ARR/Tariff Petition FY-18
Name of Distribution Licensee : MPMKVVCL BHOPAL
Investment Plan - Master
For wheeling activity + Retail supply
SYSTEM STRENGTHING 2.1, 2.2, 2,3 Yes
FEEDER SEPERATION 6.1, 6.2, 6.3 Yes
NEW PUMP CONNECTION &
MMSKPY5.1, 5.2, 5.3 Yes
ADB-II 2.1, 2.2, 2,3 Yes
ADB-III
RGGVY 5.1, 5.2, 5.3 Yes
RAPDRP PART A 1.1, 1.2, 1.3 Yes
RAPDRP PART B 4.1, 4.2, 4.3 Yes
HUDCO 1.1, 1.2, 1.3 Yes
IPDS
DDUGJY
GROSS TOTAL
Project Details
Name of schemeNature of
Project
Whether
scheme part
of approved
Business
Plan?
Internal
Accrual
(from free
reserves and
surplus)
Equity
infused
Loan
Amount (Rs.
Crores)
Loan
Agency
240.00 0.00 240.00
873.25 - 873.25 REC -
257.69 - - - - 257.69 -
0.94 - - 0.94 ADB -
0.45 0.45
211.89 - - 21.19 REC 190.70 -
0.07 - - 0.07 PFC -
0.76 - - 0.76 PFC -
-
222.19 73.19 149.00
584.46 - - 584.46 - - -
1,665.53 - - 1,794.31 - 597.39 -
2017-18
Total capital
expenditure
approved by
MPERC (Rs.
Crs.)
SOURCE OF FINANCING FOR SCHEME
Equity component Debt Component
Capital
Subsidies /
grants
component
Consumer
Contributi
on
componen
t
MPMKVVCL Annexure-I of ARR/Tariff Petition FY-18
Name of Distribution Licensee : MPMKVVCL BHOPAL
Investment Plan - Master
For wheeling activity + Retail supply
SYSTEM STRENGTHING 2.1, 2.2, 2,3 Yes
FEEDER SEPERATION 6.1, 6.2, 6.3 Yes
NEW PUMP CONNECTION &
MMSKPY5.1, 5.2, 5.3 Yes
ADB-II 2.1, 2.2, 2,3 Yes
ADB-III
RGGVY 5.1, 5.2, 5.3 Yes
RAPDRP PART A 1.1, 1.2, 1.3 Yes
RAPDRP PART B 4.1, 4.2, 4.3 Yes
HUDCO 1.1, 1.2, 1.3 Yes
IPDS
DDUGJY
GROSS TOTAL
Project Details
Name of schemeNature of
Project
Whether
scheme part
of approved
Business
Plan?
Internal
Accrual
(from free
reserves and
surplus)
Equity
infused
Loan
Amount
(Rs.
Crores)
Loan
Agency
129.95 0.00 129.95
695.25 - 695.25 REC - -
173.73 - - - - 173.73 -
0.77 - - 0.77 ADB -
0.50 0.50
213.80 - - 21.38 REC 192.42 -
0.10 - - 0.10 PFC -
0.76 - - 0.76 PFC -
-
- - -
384.78 - - 384.78 - - -
1,175.69 - - 1,233.49 - 366.15 -
2018-19
Total
capital
expenditure
approved
by MPERC
(Rs. Crs.)
SOURCE OF FINANCING FOR SCHEME
Equity component Debt Component
Capital
Subsidies /
grants
component
Consumer
Contributi
on
componen
t
MPMKVVCL Annexure-I of ARR/Tariff Petition FY-18
Name of Distribution Licensee : MPMKVVCL BHOPAL
Commissioning / Capitalisation Plan - Master Form F2b(i)
Amount in Rs. Crore
PY CY
Name of schemeNature of
Project
Whether scheme
part of approved
Business Plan?
FY16 FY17 FY18 FY19
Opening CWIP for the year 43.82 321.53 687.41 1,615.61
Additions Investment Drawn during the year
SYSTEM STRENGTHING - - -
FEEDER SEPERATION 6.1, 6.2, 6.3 Yes 99.48 208.60 53.40
NEW PUMP CONNECTION & MMSKPY 5.1, 5.2, 5.3 Yes 99.48 288.06 311.77
ADB-II 2.1, 2.2, 2,3 Yes - 4.86 -
ADB-III - - -
RGGVY 5.1, 5.2, 5.3 Yes 198.96 182.45 213.23
RAPDRP PART A 1.1, 1.2, 1.3 Yes - - -
RAPDRP PART B 4.1, 4.2, 4.3 Yes - 4.18 -
HUDCO - - -
IPDS 149.22 184.47 66.66
DDUGJY 198.96 463.23 175.34
ST&D (GoMP) 49.74 143.48 137.50
Renovation of 33/11kv Sub-Stations & DTR metering (NEW
SCHEME) TO BE POSED AS EAP)99.48 99.10 109.30
Procurement of Distribution Transformers against Failure 49.74 66.10 85.89
Procurement of Smart Meters 49.74 21.02 22.61
Project Details MYT 2016-17 to 2018-19
1,035.99
MPMKVVCL Annexure-I of ARR/Tariff Petition FY-18
Name of Distribution Licensee : MPMKVVCL BHOPAL
Commissioning / Capitalisation Plan - Master Form F2b(i)
Amount in Rs. Crore
PY CY
Name of schemeNature of
Project
Whether scheme
part of approved
Business Plan?
FY16 FY17 FY18 FY19
Project Details MYT 2016-17 to 2018-19
Sub-Total 1,035.99 994.81 1,665.53 1,175.69
Previous Schemes
Other Expenses - added to CWIP
Total 1,035.99 994.81 1,665.53 1,175.69
1,079.80
Scheme Wise Capitalization
SYSTEM STRENGTHING - 107.86 110.60 113.57
FEEDER SEPERATION 6.1, 6.2, 6.3 Yes 71.91 73.73 75.71
NEW PUMP CONNECTION & MMSKPY 5.1, 5.2, 5.3 Yes 107.86 110.60 113.57
ADB-II 2.1, 2.2, 2,3 Yes - - -
ADB-III - - -
RGGVY 5.1, 5.2, 5.3 Yes 86.29 88.48 90.85
RAPDRP PART A 1.1, 1.2, 1.3 Yes - - -
RAPDRP PART B 4.1, 4.2, 4.3 Yes - - -
HUDCO - - -
IPDS 71.91 73.73 75.71
DDUGJY 143.82 147.47 151.42
Others - - - - -
ST&D (GoMP) 64.72 66.36 68.14
Renovation of 33/11kv Sub-Stations & DTR metering (NEW
SCHEME) TO BE POSED AS EAP)28.76 29.49 30.28
26.49-
MPMKVVCL Annexure-I of ARR/Tariff Petition FY-18
Name of Distribution Licensee : MPMKVVCL BHOPAL
Commissioning / Capitalisation Plan - Master Form F2b(i)
Amount in Rs. Crore
PY CY
Name of schemeNature of
Project
Whether scheme
part of approved
Business Plan?
FY16 FY17 FY18 FY19
Project Details MYT 2016-17 to 2018-19
Procurement of Distribution Transformers against Failure 28.76 29.49 30.28
Procurement of Smart Meters 7.19 7.37 7.57
Sub-Total 26.49- 719.08 737.33 757.11
Previous Schemes - - - -
Other Expenses - added to CWIP
Total 26.49- 719.08 737.33 757.11
Year wise break up of Capitalization of Investments during the year
Capitalization of FY13 investments
Capitalization of FY14 investments
Capitalization of FY15 investments
Capitalization of FY16 investments
Capitalization of FY17 investments
Capitalization of FY18 investments 737.33
Capitalization of FY19 investments 757.11
Capitalization of opening CWIP - -
Total Capitalization of Investments during the year 737.33 757.11
Closing CWIP 321.53 687.41 1,615.61 2,034.20
MPMKVVCL Annexure-I of ARR/Tariff Petition FY-18
MPMKVVCL BHOPAL
Year-wise Capital Expenditure
For wheeling activity + Retail supply
CWIP
Internal
Accrual
(from free
reserves
and
surplus)
Equity
infused
Loan
Amount
(Rs.
Crores)
Loan
Agency
SYSTEM STRENGTHING - - 16.24 47.02 - - - 107.86
FEEDER SEPERATION 6.1, 6.2, 6.3 99.48 - - 184.62 REC - - 71.91
NEW PUMP CONNECTION
& MMSKPY5.1, 5.2, 5.3 99.48 - 164.97 - - - - 107.86
ADB-II 2.1, 2.2, 2,3 - - - 13.64 ADB - - -
ADB-III - - - 48.78 - - - -
RGGVY 5.1, 5.2, 5.3 198.96 - - 10.89 REC 98.05 - 86.29
RAPDRP PART A 1.1, 1.2, 1.3 - - - - PFC - - -
RAPDRP PART B 1.1, 1.2, 1.3 - - - 49.55 REC &
PFC - - -
HUDCO - - - - - - - - -
IPDS 149.22 - - 15.75 GOMP 29.18 - 71.91
DDUGJY 198.96 - - - - - - 143.82
Other Expenses - added to
CWIP - -
GROSS TOTAL - 1,138.46 1,164.95 746.11 1,911.06 - 181.21 370.25 - 127.23 - 5,915.34 589.65 1,321.41
1,138.46 1,164.95 1,911.06 5,915.34 1,321.41
2016-17
Cumulative
expenditure
till
beginning of
year
Opening
CWIP
Capex
during the
year
Total capex
till end of
year
SOURCE OF FINANCING FOR SCHEME Capitalisation
Equity component Debt Component
Capital
Subsidies /
grants
component
Consumer
Contributi
on
component
Cumulative
capitalisation
till beginning
of year
Capitalisat
ion during
the year
Balance
CWIP at
end of year
Project Details
Name of schemeNature of
Project
MPMKVVCL Annexure-I of ARR/Tariff Petition FY-18
MPMKVVCL BHOPAL
Year-wise Capital Expenditure
For wheeling activity + Retail supply
SYSTEM STRENGTHING
FEEDER SEPERATION 6.1, 6.2, 6.3
NEW PUMP CONNECTION
& MMSKPY5.1, 5.2, 5.3
ADB-II 2.1, 2.2, 2,3
ADB-III
RGGVY 5.1, 5.2, 5.3
RAPDRP PART A 1.1, 1.2, 1.3
RAPDRP PART B 1.1, 1.2, 1.3
HUDCO -
IPDS
DDUGJY
Other Expenses - added to
CWIP
GROSS TOTAL -
Project Details
Name of schemeNature of
Project
CWIP
Internal
Accrual
(from free
reserves
and
surplus)
Equity
infused
Loan
Amount (Rs.
Crores)
Loan
Agency
- - - 240.00 - - - 110.60
208.60 - - 873.25 REC - - 73.73
288.06 - - - - 257.69 - 110.60
4.86 - - 0.94 ADB - - -
- - - 0.45 - - - -
182.45 - - 21.19 REC 190.70 - 88.48
- - - 0.07 PFC - - -
4.18 - - 0.76 PFC - - -
- - - - - - - -
184.47 - - 73.19 - 149.00 - 73.73
463.23 - - 584.46 - - - 147.47
- -
1,911.06 1,321.41 1,335.85 2,657.26 - - 1,794.31 - 597.39 - 6,634.42 604.61 1,525.46
1,911.06 1,321.41 2,657.26 6,634.42 2,052.65
2017-18
Cumulative
expenditure
till beginning
of year
Opening
CWIP
Capex
during the
year
Total capex
till end of
year
SOURCE OF FINANCING FOR SCHEME Capitalisation
Equity component Debt Component
Capital
Subsidies /
grants
component
Consume
r
Contribu
tion
compone
nt
Cumulative
capitalisation
till beginning
of year
Capitalisati
on during
the year
Balance
CWIP at
end of year
MPMKVVCL Annexure-I of ARR/Tariff Petition FY-18
MPMKVVCL BHOPAL
Year-wise Capital Expenditure
For wheeling activity + Retail supply
SYSTEM STRENGTHING
FEEDER SEPERATION 6.1, 6.2, 6.3
NEW PUMP CONNECTION
& MMSKPY5.1, 5.2, 5.3
ADB-II 2.1, 2.2, 2,3
ADB-III
RGGVY 5.1, 5.2, 5.3
RAPDRP PART A 1.1, 1.2, 1.3
RAPDRP PART B 1.1, 1.2, 1.3
HUDCO -
IPDS
DDUGJY
Other Expenses - added to
CWIP
GROSS TOTAL -
Project Details
Name of schemeNature of
Project
CWIP
Internal
Accrual
(from free
reserves
and
surplus)
Equity
infused
Loan
Amount
(Rs.
Crores)
Loan
Agency
- - - 129.95 - - - -
53.40 - - 695.25 REC - - -
311.77 - - - - 173.73 - -
- - - 0.77 ADB - - -
- - - 0.50 - - -
213.23 - - 21.38 REC 192.42 - -
- - - 0.10 PFC - - -
- - - 0.76 PFC - - -
- - - - - - - -
66.66 - - - - - -
175.34 - - 384.78 - - -
- -
2,657.26 2,052.65 820.39 2,873.04 - - 1,233.49 - 366.15 - 7,371.75 - 1,944.05
2,657.26 2,052.65 2,873.04 7,371.75 2,873.04
2018-19
Cumulative
expenditure
till
beginning
of year
Opening
CWIP
Capex
during the
year
Total capex
till end of
year
SOURCE OF FINANCING FOR SCHEME Capitalisation
Equity component Debt Component
Capital
Subsidies /
grants
component
Consumer
Contributi
on
componen
t
Cumulative
capitalisatio
n till
beginning of
year
Capitalis
ation
during
the year
Balance
CWIP at
end of year
MPMKVVCL Annexure-I of ARR/Tariff Petition FY-18
MPMKVVCL BHOPAL
Financing of capitalised works
Wheeling Activity
CY
FY17 FY18 FY19
Amount Capitalised in Work/Equipment
Financing Details:-
RAPDRP-A 0.00 0.07 0.10
RAPDRP-B 49.55 0.76 0.76
IPDS (30%+10% Loan) 15.75 0.05 0.07
Feeder Separation 184.62 1.42 1.48
ADB-II 13.64 0.94 0.77
ADB-III 48.78 0.45 0.50
SSTD 0.00 0.75 0.41
RGGVY (10% Loan) 11.30 21.18 21.38
DDUGJY (30%+10% Loan) 0.00 0.00 0.00
Total Loan Amount 323.63 25.63 25.47
Equity 0.00 0.00 0.00
Internal Resources - - -
Consumer Contribution
Capital Subsidies / Grants (RGGVY,
NPC,DDUGJY,IPDS)860.49 597.39 366.15
Others -
Total 1184.12 623.02 391.62
Rates of Interest for Loans (floating): %
RAPDRP-A 9.00% 9.00% 9.00%
RAPDRP-B 9.00% & 12.25% 9.00% & 12.25% 9.00% & 12.25%
IPDS (30%+10% Loan) 9.00% & 12.25% 9.00% & 12.25% 9.00% & 12.25%
Feeder Separation 12.25% &
Libor+0.6 bps
12.25% &
Libor+0.6 bps
12.25% &
Libor+0.6 bps
ADB-IILibor+0.6 bps &
12.50%
Libor+0.6 bps &
12.50%
Libor+0.6 bps &
12.50%
ADB-IIILibor+0.6 bps &
12.50%
Libor+0.6 bps &
12.50%
Libor+0.6 bps &
12.50%
SSTD 16.50% & 12.25% 16.50% & 12.25% 16.50% & 12.25%
ParticularsMYT 2016-17 to 2018-19
Form F2b(iii)
Amount in Rs. Crores
MPMKVVCL Annexure-I of ARR/Tariff Petition FY-18
MPMKVVCL BHOPAL
Financing of capitalised works
Wheeling Activity
CY
FY17 FY18 FY19Particulars
MYT 2016-17 to 2018-19
Form F2b(iii)
Amount in Rs. Crores
RGGVY (10% Loan) 11.75%-12.50% 11.75%-12.50% 11.75%-12.50%
DDUGJY (30%+10% Loan) 12.25% 12.25% 12.25%
Moratorium Period for the loans:
RAPDRP-A 6 Years 6 Years 6 Years
RAPDRP-B 5 Years & 10 Years 5 Years & 10 Years 5 Years & 10 Years
IPDS (30%+10% Loan) 5 Years 5 Years 5 Years
Feeder Separation 3 Years & 5 Years 3 Years & 5 Years 3 Years & 5 Years
ADB-II 5 Years 5 Years 5 Years
ADB-III 5 Years 5 Years 5 Years
SSTD 3 Years & Nil 3 Years & Nil 3 Years & Nil
RGGVY (10% Loan) 5 Years 5 Years 5 Years
DDUGJY (30%+10% Loan) 5 Years 5 Years 5 Years
Moratorium effective from:
RAPDRP-A 2009 2009 2009
RAPDRP-B 2010 2010 2010
IPDS (30%+10% Loan) 2015 2015 2015
Feeder Separation 2011 2011 2011
ADB-II 2008 2008 2008
ADB-III 2014 2014 2014
SSTD 2013 2013 2013
RGGVY (10% Loan) 2008 2008 2008
DDUGJY (30%+10% Loan) 2015 2015 2015
Repayment Period of the loans:
RAPDRP-A 4 Years 4 Years 4 Years
RAPDRP-B15 Years & 10
Years
15 Years & 10
Years
15 Years & 10
Years
IPDS (30%+10% Loan) 15 Years 15 Years 15 Years
Feeder Separation 10 Years & 20
Years
10 Years & 20
Years
10 Years & 20
Years
MPMKVVCL Annexure-I of ARR/Tariff Petition FY-18
MPMKVVCL BHOPAL
Financing of capitalised works
Wheeling Activity
CY
FY17 FY18 FY19Particulars
MYT 2016-17 to 2018-19
Form F2b(iii)
Amount in Rs. Crores
ADB-II 20 Years 20 Years 20 Years
ADB-III 20 Years 20 Years 20 Years
SSTD 5 Years & 10 Years 5 Years & 10 Years 5 Years & 10 Years
RGGVY (10% Loan) 10 Years 10 Years 10 Years
DDUGJY (30%+10% Loan) 10 Years 10 Years 10 Years
Repayment effective from:
RAPDRP-A 2015 2015 2015
RAPDRP-B 2015 2015 2015
IPDS (30%+10% Loan) 2020 2020 2020
Feeder Separation 2015 2015 2015
ADB-II 2013 2013 2013
ADB-III 2019 2019 2019
SSTD 2015 2015 2015
RGGVY (10% Loan) 2012 2012 2012
DDUGJY (30%+10% Loan) 2020 2020 2020
MPMKVVCL Annexure-I of ARR/Tariff Petition FY-18
Name of Distribution Licensee : MPMKVVCL BHOPAL
A Capital Works in Progress - Summary Statement Form No: F2c
Amount in Rs. Crore
Distribution (Wheeling + Retailing)
FY17 FY18 FY19
A Opening Balance of CWIP 321.53 597.26 1,525.46
B Fresh Investment during the year 994.81 1,665.53 1,175.69
Total Capitalisation during the year (A+B) 1,316.34 2,262.79 2,701.15
C Investment capitalised out of opening CWIP - - -
D Investment capitalised out of fresh investment 719.08 737.33 757.11
Closing Balance of CWIP (A + B - C - D) 597.26 1,525.46 1,944.05
SL. No. ParticularsMYT 2016-17 to 2018-19
MPMKVVCL Annexure-I of ARR/Tariff Petition FY-18
Name of Distribution Licensee : MPMKVVCL BHOPAL
Details of Expenses Capitalised Form No: F2d
Amount in Rs. Crore
Wheeling +Retail Sale activity
Sl.No. Particulars PY
FY17 FY18 FY19
1 Interest & Finance charges Capitalised 22.62
2 Other expenses capitalised:
a. Employee expenses 29.55- - -
b. R&M Expenses - - -
c. A&G Expenses - - -
d. Others, if any - - -
Total of 2 29.55- - -
3 Capitalisation of depreciation, if any - - -
Grand Total (1+2+3) 6.93- - -
MYT 2016-17 to 2018-19
MPMKVVCL Annexure-I of ARR/Tariff Petition FY-18
MPMKVVCL BHOPAL
Contributions, Grants and subsidies towards Cost of Capital Assets Form No: F2e
Amount in Rs. Crore
Wheeling +Retail Sale activity
Sl No Particulars
Additions
during the
Year
Balance at
the end of
the Year
Additions
during the
Year
Balance at
the end of
the Year
Additions
during the
Year
Balance at the
end of the
Year
Consumer Contribution Towards Cost of
Network Assets31.18 16.85 24.01
1Grants for Electrification Under
RGGVY- - - 0.00 - 0.00
Sub-Total - - - - - -
1Subsidies Towards Cost Of Network
Assets- - - 0.00 - 0.00
2 Grant Towards Cost Of Network Assets - 0.00 - 0.00
Sub-Total - - - - - -
Total - - - - - -
FY18 FY19FY17
MPMKVVCL Annexure-I of ARR/Tariff Petition FY-18
Name of Distribution Licensee : MPMKVVCL BHOPAL
Summary statement of Interest & Finance Charges Form No: F3
Amount in Rs. Crore
Particulars CY
FY17 FY18 FY19
A I Interest charges on State Govt. Loans, Bonds And Advances
1 Interest charges on loans from the State Government
2 Interest charges on Bonds
3 Interest charges on Foreign Currency Loans / Credits
4 Interest charges on debentures
Total of I 204.63 186.35 195.49
IIInterest on Long Term Loans / Credits from the FIs/banks/organisations approved
by the State Govt
Secured
1 REC 156.85 160.91 158.88
2 PFC 107.09 71.13 89.11
3 ADB 23.27 19.65 21.46
4 HUDCO 7.89 7.62 7.75
Total of II 295.10 259.30 277.20
III Total of A : I + II 499.73 445.65 472.69
B Cost of raising finance & Bank Charges on project loans * 67.37 41.81 43.91
Bank Charges 1.38 1.97 1.67
Guarantee Charges 18.48 15.22 16.85
Other charges 49.66 25.80 37.73
Less: Rebate in Interest for timely payment 2.15- 1.18- 1.66-
C Grand Total Of Interest & Finance Charges: A + B 567.10 487.46 516.60
D Less: Interest & Finance Charges Chargeable to Capital Account 22.62- 24.56- 23.59-
MYT 2016-17 to 2018-19
MPMKVVCL Annexure-I of ARR/Tariff Petition FY-18
Name of Distribution Licensee : MPMKVVCL BHOPAL
Summary statement of Interest & Finance Charges Form No: F3
Amount in Rs. Crore
E Net Total Of Interest & Finance Charges on Project Loans C-D 589.72 512.02 540.18
F Interest and Finance Charges on Working Capital Loans 68.39 33.68 49.29
G Interest on Consumer Security Deposit 54.87 53.12 57.88
HInterest at weighted average rate of loan portfolio on excess additional equity, if
any**
I Total interest and finance charges chargeable to revenue account (E+F+G+H) 712.99 598.82 647.35
Interest & Finance Charges(Wheeling + Retail sales activities)* CY MYT 2016-17 to 2018-19
Particulars
In Rs Crores FY17 FY18 FY19
1. Addition to GFA during the year 719.08 737.33 757.11
2. Consumer constribution during the year 31.18 16.85 24.01
3. Net addition to GFA during the year (1-2) 687.90 720.48 733.09
4. 30% of addition to net GFA considered as funded through equity(4=3*30%) 206.37 216.15 219.93
5. Balance addition to net GFA during the year funded through debt(5=3-4) 481.53 504.34 513.17
6. Debt Repayment due during the year (equal to the depreciation claim) 270.54 223.38 253.95
7. Debt associated with GFA as per tariff order FY 14-15 (Rs. 1634.34 crore as on 31st
March 2014 +addition in GFA funded through loan - debt repayment )and for
subsiquent years projected as per method adopted in tariff order of FY 13-14
1,919.34 2,200.29 2,459.51
8. Weighted average rate of interest % on all loans 10.94% 7.44% 7.32%
9.Total Interest on project loans(9=7*8) 210.06 163.63 180.11
10. Finance Charges 17.89 19.67 21.64
11. Total Interest on project loan and Finance charges 227.94 183.31 201.75
Interest and Finance Charges on Working Capital Loans 68.39 33.68 49.29
Interest on Consumer Security Deposit 54.87 53.12 57.88
Total Interest and Finance charges 351.21 270.11 308.92
MPMKVVCL Annexure-I of ARR/Tariff Petition FY-18
Name of Distribution Licensee : MPMKVVCL BHOPALCalculation of weighted average rate of interest on actual loans Form No: F3a
Amount in Rs. Crores
PY PY CY
FY15 FY16 FY 17 FY 18 FY 19
Loan - REC (Inherited) PS
Gross Loan - Opening (Rs. Crs.) 56.79 48.21 38.93 0.00 -9.01
Add: Drawals during the year (Rs. Crs.) 0.00 0.00 - 0.00 0.00
Less: Repayment of Loan during the year (Rs. Crs.) 8.57 9.28 9.18 9.01 9.16
Less: Loan Conversion under UDAY 29.75
Closing Balance of loan (Rs. Crs.) 48.21 38.93 0.00 -9.01 -18.17
Average loan (Rs. Crs.) 52.50 43.57 19.47 -4.51 -13.59
Rate of Interest on loan % 8.00% 8.00% 7.95% 8.00% 8.00%
Interest on loan (Rs. Crs.) 4.21 3.50 2.54 3.41 3.15
Loan - REC(Additional Liability) PS
Gross Loan - Opening (Rs. Crs.) 44.05 36.04 28.03 0.00 -7.79
Add: Drawals during the year (Rs. Crs.) 0.00 0.00 - 0.00 0.00
Less: Repayment of Loan during the year (Rs. Crs.) 8.01 8.01 7.34 7.79 7.71
Less: Loan Conversion under UDAY 20.69
Closing Balance of loan (Rs. Crs.) 36.04 28.03 0.00 -7.79 -15.50
Average loan (Rs. Crs.) 40.05 32.04 14.02 -3.89 -11.64
Rate of Interest on loan % 8.00% 8.00% 11.75% 8.00% 8.00%
Interest on loan (Rs. Crs.) 4.70 3.78 2.79 3.76 3.44
Loan - PFC (Inherited) PS
Gross Loan - Opening (Rs. Crs.) 6.42 2.94 1.38 0.00 -1.99
Add: Drawals during the year (Rs. Crs.) 0.00 0.00 - 0.00 0.00
Less: Repayment of Loan during the year (Rs. Crs.) 3.48 1.56 0.92 1.99 1.49
Less: Loan Conversion under UDAY 0.46
Closing Balance of loan (Rs. Crs.) 2.94 1.38 0.00 -1.99 -3.48
Average loan (Rs. Crs.) 4.68 2.16 0.69 -0.99 -2.73
Rate of Interest on loan % 12.75% 12.75% 12.00% 12.75% 12.75%
Interest on loan (Rs. Crs.) 0.56 0.27 0.10 0.31 0.23
Loan - PP Bonds
Gross Loan - Opening (Rs. Crs.) 27.1602 27.16 27.16 2.71 2.71
Add: Drawals during the year (Rs. Crs.) 0.00 0.00 - 0.00 0.00
Less: Repayment of Loan during the year (Rs. Crs.) 0.00 0.00 24.45 0 0.00
Less: Loan Conversion under UDAY (Estimated) -
Closing Balance of loan (Rs. Crs.) 27.16 27.16 2.71 2.71 2.71
Average loan (Rs. Crs.) {(Op Bal + Cl Bal)/2} 27.16 27.16 14.94 2.71 2.71
Rate of Interest on loan %13.70%-
15.00%
13.70%-
15.00%-
13.70%-
15.00%
13.70%-
15.00%
Interest on loan (Rs. Crs.) 2.65 2.53 2.54 2.57 2.55
Loan - ADB II PS
Gross Loan - Opening (Rs. Crs.) 410.5316 526.00 595.96 595.96 657.77
Add: Drawals during the year (Rs. Crs.) 115.47 69.97 - 61.81 43.93
Less: Repayment of Loan during the year (Rs. Crs.) 0.00 0.00 - 0.00 0.00
Less: Loan Conversion under UDAY -
Closing Balance of loan (Rs. Crs.) 526.00 595.97 595.96 657.77 701.70
Average loan (Rs. Crs.) 468.27 560.98 595.96 626.87 679.74
Type of
Loan (
"PS" or
"WC" )
Particulars
MYT 2016-17 to 2018-19
MPMKVVCL Annexure-I of ARR/Tariff Petition FY-18
Name of Distribution Licensee : MPMKVVCL BHOPALCalculation of weighted average rate of interest on actual loans Form No: F3a
Amount in Rs. Crores
PY PY CY
FY15 FY16 FY 17 FY 18 FY 19
Type of
Loan (
"PS" or
"WC" )
Particulars
MYT 2016-17 to 2018-19
Rate of Interest on loan %(Libor +
0.60bps)
(Libor +
0.60bps)
2% to 3%
(Libor+0.60)
(Libor +
0.60bps)
(Libor +
0.60bps)
Interest on loan (Rs. Crs.) 7.95 10.64 16.38 11.66 12.89
Penal Interest 2.71 0.12
Loan - REC (ADB Tranche-IV CP) PS
Gross Loan - Opening (Rs. Crs.) 0.3732 1.0504 1.8004 0 0
Add: Drawals during the year (Rs. Crs.) 0.68 0.75 0.27 0.00 0.00
Less: Repayment of Loan during the year (Rs. Crs.) 0.00 0.00 - 0.00 0.00
Less: Loan Conversion under UDAY 2.07
Closing Balance of loan (Rs. Crs.) 1.05 1.80 0.00 0.00 0.00
Average loan (Rs. Crs.) 0.71 1.43 0.90 0.00 0.00
Rate of Interest on loan % 12.25% 12.25% 11.50% 12.25% 12.25%
Interest on loan (Rs. Crs.) 0.09 0.18 0.23 0.17 0.19
Penal Interest 0.01 0.00 0.00 0.00 0.00
Loan - REC (ADB Tranche-V CP) PS
Gross Loan - Opening (Rs. Crs.) 133.71 142.72 145.78 0.00 8.25
Add: Drawals during the year (Rs. Crs.) 9.01 19.25 - 9.42 9.56
Less: Repayment of Loan during the year (Rs. Crs.) 0.00 16.20 16.20 1.18 2.54
Less: Loan Conversion under UDAY 129.58
Closing Balance of loan (Rs. Crs.) 142.72 145.78 0.00 8.25 15.26
Average loan (Rs. Crs.) 138.21 144.25 72.89 4.12 11.75
Rate of Interest on loan % 12.25% 12.25% 11.50% 12.25% 12.25%
Interest on loan (Rs. Crs.) 17.4619 18.86 16.22 1.10 2.06
Penal Interest 0.07 0.00 0.00 0.00 0.00
Loan - PFC (ADB Tranche-VI CP) PS
Gross Loan - Opening (Rs. Crs.) 41.46 60.60 91.12 0.00 18.69
Add: Drawals during the year (Rs. Crs.) 20.00 35.35 13.37 22.91 23.88
Less: Repayment of Loan during the year (Rs. Crs.) 0.8577 4.83 6.98 4.22 5.34
Less: Loan Conversion under UDAY 97.51
Closing Balance of loan (Rs. Crs.) 60.60 91.12 0.00 18.69 37.22
Average loan (Rs. Crs.) {(Op Bal + Cl Bal)/2} 51.03 75.86 45.56 9.34 27.95
Rate of Interest on loan % 12.50% 12.50% 12.00% 12.50% 12.50%
Interest on loan (Rs. Crs.) 5.8819 8.82 10.90 8.53 9.42
Loan - ADB III PS
Gross Loan - Opening (Rs. Crs.) 0.00 29.86 86.72 121.86 162.48
Add: Drawals during the year (Rs. Crs.) 29.86 56.87 35.14 40.62 44.21
Less: Repayment of Loan during the year (Rs. Crs.) 0.00 0.00 - 0.00 0.00
Less: Loan Conversion under UDAY -
Closing Balance of loan (Rs. Crs.) 29.86 86.72 121.86 162.48 206.69
Average loan (Rs. Crs.) 14.93 58.29 104.29 142.17 184.59
Rate of Interest on loan %(Libor +
0.60bps)
(Libor +
0.60bps)2% to 3% (Libor+0
(Libor +
0.60bps)
(Libor +
0.60bps)
Interest on loan (Rs. Crs.) 0.55 1.42 2.88 1.62 1.97
MPMKVVCL Annexure-I of ARR/Tariff Petition FY-18
Name of Distribution Licensee : MPMKVVCL BHOPALCalculation of weighted average rate of interest on actual loans Form No: F3a
Amount in Rs. Crores
PY PY CY
FY15 FY16 FY 17 FY 18 FY 19
Type of
Loan (
"PS" or
"WC" )
Particulars
MYT 2016-17 to 2018-19
Loan -PFC Counterpart for ADB-III PS
Gross Loan - Opening (Rs. Crs.) 13.00 14.00 14.00 0.00 4.41
Add: Drawals during the year (Rs. Crs.) 1.00 0.00 13.64 4.88 6.17
Less: Repayment of Loan during the year (Rs. Crs.) 0.00 0.00 1.38 0.46 0.61
Less: Loan Conversion under UDAY 26.26
Closing Balance of loan (Rs. Crs.) 14.00 14.00 0.00 4.41 9.97
Average loan (Rs. Crs.) {(Op Bal + Cl Bal)/2} 13.50 14.00 7.00 2.21 7.19
Rate of Interest on loan % 12.50% 12.50% 12.00% 12.50% 12.50%
Interest on loan (Rs. Crs.) 1.7366 1.79 2.78 2.10 2.22
Loan - ADB (Feeder Separation Tranche-I) PS
Gross Loan - Opening (Rs. Crs.) 91.32 127.59 161.41 233.02 280.25
Add: Drawals during the year (Rs. Crs.) 36.26 33.83 71.61 47.23 50.89
Less: Repayment of Loan during the year (Rs. Crs.) 0.00 0.00 - 0.00 0.00
Less: Loan Conversion under UDAY -
Closing Balance of loan (Rs. Crs.) 127.59 161.41 233.02 280.25 331.14
Average loan (Rs. Crs.) 109.45 144.50 197.22 256.64 305.70
Rate of Interest on loan %(Libor +
0.60bps)
(Libor +
0.60bps)2% to 3% (Libor+0
(Libor +
0.60bps)
(Libor +
0.60bps)
Interest on loan (Rs. Crs.) 2.11 3.06 4.59 3.25 3.63
Penal Interest 0.00 0.00
Loan - ADB (Feeder Separation Tranche-II) PS
Gross Loan - Opening (Rs. Crs.) 64.64 81.38 86.52 139.13 163.96
Add: Drawals during the year (Rs. Crs.) 16.74 5.13 52.61 24.83 27.52
Less: Repayment of Loan during the year (Rs. Crs.) 0.00 0.00 - 0.00 0.00
Less: Loan Conversion under UDAY -
Closing Balance of loan (Rs. Crs.) 81.38 86.52 139.13 163.96 191.48
Average loan (Rs. Crs.) 73.01 83.95 112.83 151.54 177.72
Rate of Interest on loan %(Libor +
0.60bps)
(Libor +
0.60bps)2% to 3% (Libor+0
(Libor +
0.60bps)
(Libor +
0.60bps)
Interest on loan (Rs. Crs.) 1.65 2.07 3.00 2.24 2.44
Penal Interest 0.00 0.00
Loan - IPDS Loan (30%) PS
Gross Loan - Opening (Rs. Crs.) 0.00 0.00 - 0.00 0.00
Add: Drawals during the year (Rs. Crs.) 0.00 0.00 - 0.00 0.00
Less: Repayment of Loan during the year (Rs. Crs.) 0.00 0.00 - 0.00 0.00
Less: Loan Conversion under UDAY (Estimated) -
Closing Balance of loan (Rs. Crs.) 0.00 0.00 0.00 0.00 0.00
Average loan (Rs. Crs.) 0.00 0.00 - 0.00 0.00
Rate of Interest on loan % 0.00 0.00 - 9.00% 9.00%
Interest on loan (Rs. Crs.) 0.00 0.00 - 0.00 0.00
Loan - IPDS Utility Contribution (10%) PS
Gross Loan - Opening (Rs. Crs.) 0.00 0.00 - 15.75 21.00
Add: Drawals during the year (Rs. Crs.) 0.00 0.00 15.75 5.25 7.00
Less: Repayment of Loan during the year (Rs. Crs.) 0.00 0.00 - 0.00 0.00
Less: Loan Conversion under FRP -
Closing Balance of loan (Rs. Crs.) 0.00 0.00 15.75 21.00 28.00
Average loan (Rs. Crs.) 0.00 0.00 7.88 18.38 24.50
Rate of Interest on loan % 0.00 0.00 14.50% 12.25% 12.25%
MPMKVVCL Annexure-I of ARR/Tariff Petition FY-18
Name of Distribution Licensee : MPMKVVCL BHOPALCalculation of weighted average rate of interest on actual loans Form No: F3a
Amount in Rs. Crores
PY PY CY
FY15 FY16 FY 17 FY 18 FY 19
Type of
Loan (
"PS" or
"WC" )
Particulars
MYT 2016-17 to 2018-19
Interest on loan (Rs. Crs.) 0.00 0.00 0.14 0.05 0.06
Loan - RAPDRP A (PFC) PS
Gross Loan - Opening (Rs. Crs.) 64.73 64.73 86.24 86.24 93.41
Add: Drawals during the year (Rs. Crs.) 0.00 21.51 - 7.17 9.56
Less: Repayment of Loan during the year (Rs. Crs.) 0.00 0.00 - 0.00 0.00
Less: Loan Conversion under UDAY -
Closing Balance of loan (Rs. Crs.) 64.73 86.24 86.24 93.41 102.97
Average loan (Rs. Crs.) 64.73 75.48 86.24 89.82 98.19
Rate of Interest on loan % 9.00% 9.00% 9.00% 9.00% 9.00%
Interest on loan (Rs. Crs.) 5.83 8.63 9.17 7.87 8.56
Penal Interest 1.54
Loan - SCADA RAPDRP-A (PFC) PS
Gross Loan - Opening (Rs. Crs.) 15.68 0.00 0.00 0.00 0.00
Add: Drawals during the year (Rs. Crs.) 0.00 0.00 0.00 0.00 0.00
Less: Repayment of Loan during the year (Rs. Crs.) 0.00 0.00 0.00 0.00 0.00
Less: Loan Conversion under UDAY 15.68 0.00 0.00 0.00 0.00
Closing Balance of loan (Rs. Crs.) 0.00 0.00 0.00 0.00 0.00
Average loan (Rs. Crs.) 9.00% 9.00% 0.00 0.00 0.00
Rate of Interest on loan % 1.41 0.20 0.00 0.00 0.00
Penal Interest 0.00 0.00 0.00 0.00
Loan - RAPDRP B (PFC) PS
Gross Loan - Opening (Rs. Crs.) 125.0115 125.01 125.01 125.01 125.01
Add: Drawals during the year (Rs. Crs.) 0.00 0.00 - 0.00 0.00
Less: Repayment of Loan during the year (Rs. Crs.) 0.00 0.00 - 0.00 0.00
Less: Loan Conversion under UDAY -
Closing Balance of loan (Rs. Crs.) 125.01 125.01 125.01 125.01 125.01
Average loan (Rs. Crs.) 125.01 125.01 125.01 125.01 125.01
Rate of Interest on loan % 9.00% 9.00% 9.00% 9.00% 9.00%
Interest on loan (Rs. Crs.) 11.25 13.99 4.38 9.87 9.41
Penal Interest 0.85
Loan -REC as Counterpart for RAPDRP B PS
Gross Loan - Opening (Rs. Crs.) 264.92 340.83 398.14 53.03 112.61
Add: Drawals during the year (Rs. Crs.) 75.91 101.55 49.55 75.67 75.59
Less: Repayment of Loan during the year (Rs. Crs.) 0.00 44.24 - 16.09 26.89
Less: Loan Conversion under UDAY 394.66
Closing Balance of loan (Rs. Crs.) 340.83 398.14 53.03 112.61 161.31
Average loan (Rs. Crs.) 302.87 369.48 225.58 82.82 136.96
Rate of Interest on loan % 12.25% 12.25% 11.50% 12.25% 12.25%
Interest on loan (Rs. Crs.) 36.26 0.48 49.99 15.67 22.90
Penal Interest 0.08 0.00 0.00 0.00 0.00
Loan -REC for JBIC scheme PS
Gross Loan - Opening (Rs. Crs.) 57.86 52.07 46.29 0.00 0.00
Add: Drawals during the year (Rs. Crs.) 0.00 0.00 - 0.00 0.00
Less: Repayment of Loan during the year (Rs. Crs.) 5.79 5.79 5.79
MPMKVVCL Annexure-I of ARR/Tariff Petition FY-18
Name of Distribution Licensee : MPMKVVCL BHOPALCalculation of weighted average rate of interest on actual loans Form No: F3a
Amount in Rs. Crores
PY PY CY
FY15 FY16 FY 17 FY 18 FY 19
Type of
Loan (
"PS" or
"WC" )
Particulars
MYT 2016-17 to 2018-19
Less: Loan Conversion under UDAY 40.50
Closing Balance of loan (Rs. Crs.) 52.07 46.29 0.00 0.00 0.00
Average loan (Rs. Crs.) 54.97 49.18 23.15 0.00 0.00
Rate of Interest on loan % 10.30% 10.30% 11% 10.30% 10.30%
Interest on loan (Rs. Crs.) 5.5594 4.77 4.26 0.00 0.00
Penal Interest 0.46 0.00 0.00 0.00 0.00
Loan -REC Feeder Separation PS
Gross Loan - Opening (Rs. Crs.) 143.52 194.80 245.32 0.00 59.93
Add: Drawals during the year (Rs. Crs.) 70.63 78.73 60.40 69.92 69.68
Less: Repayment of Loan during the year (Rs. Crs.) 19.35 28.21 - 9.99 21.60
Less: Loan Conversion under UDAY 305.72
Closing Balance of loan (Rs. Crs.) 194.80 245.32 0.00 59.93 108.01
Average loan (Rs. Crs.) {(Op Bal + Cl Bal)/2} 169.16 220.06 122.66 29.97 83.97
Rate of Interest on loan % 12.25% 12.25% 11.50% 12.25% 12.25%
Interest on loan (Rs. Crs.) 21.2558 28.13 35.49 8.31 15.33
Penal Interest 0.0912 0.00 0.00 0.00 0.00
Loan -REC Feeder Separation (Vidisha-II) PS
Gross Loan - Opening (Rs. Crs.) 12.94 0.00 0.00 0.00 0.00
Add: Drawals during the year (Rs. Crs.) 7.39 0.00 0.00 0.00
Less: Repayment of Loan during the year (Rs. Crs.) 0.00 0.00 0.00 0.00 0.00
Less: Loan Conversion under UDAY 20.33 0.00 0.00 0.00 0.00
Closing Balance of loan (Rs. Crs.) 0.00 0.00 0.00 0.00 0.00
Average loan (Rs. Crs.) 12.25% 12.25% 0.00 0.00 0.00
Rate of Interest on loan % 2.08 0.00 0.00 0.00 0.00
0.00 0.00 0.00
Loan -REC Feeder Separation (SSTD) PS
Gross Loan - Opening (Rs. Crs.) 60.10 60.10 60.10 9.14 10.83
Add: Drawals during the year (Rs. Crs.) 0.00 0.00 9.14 3.05 4.06
Less: Repayment of Loan during the year (Rs. Crs.) 0.00 0.00 - 1.35 1.86
Less: Loan Conversion under UDAY 60.11
Closing Balance of loan (Rs. Crs.) 60.10 60.10 9.14 10.83 13.03
Average loan (Rs. Crs.) {(Op Bal + Cl Bal)/2} 60.10 60.10 34.62 9.99 11.93
Rate of Interest on loan % 12.25% 12.25% 11.50% 12.25% 12.25%
Interest on loan (Rs. Crs.) 7.36 7.37 6.75 1.49 1.81
Loan- (DDUGJY) (30%) PS
Gross Loan - Opening (Rs. Crs.) 0.00 0.00 - 0.00 0.00
Add: Drawals during the year (Rs. Crs.) 0.00 0.00 - 0.00 0.00
Less: Repayment of Loan during the year (Rs. Crs.) 0.00 0.00 - 0.00 0.00
Less: Loan Conversion under UDAY (Estimated) 0.00 -
Closing Balance of loan (Rs. Crs.) 0.00 0.00 0.00 0.00 0.00
Average loan (Rs. Crs.) 0.00 0.00 - 0.00 0.00
Rate of Interest on loan % 0.00 10.50% - 10.50% 10.50%
Interest on loan (Rs. Crs.) 0.00 0.00 - 0.00 0.00
Loan- (DDUGJY) (10%) PS
Gross Loan - Opening (Rs. Crs.) 0.00 0.00 0.00 0.00 0.00
Add: Drawals during the year (Rs. Crs.) 0.00 0.00 0.00 0.00 0.00
Less: Repayment of Loan during the year (Rs. Crs.) 0.00 0.00 0.00 0.00 0.00
MPMKVVCL Annexure-I of ARR/Tariff Petition FY-18
Name of Distribution Licensee : MPMKVVCL BHOPALCalculation of weighted average rate of interest on actual loans Form No: F3a
Amount in Rs. Crores
PY PY CY
FY15 FY16 FY 17 FY 18 FY 19
Type of
Loan (
"PS" or
"WC" )
Particulars
MYT 2016-17 to 2018-19
Less: Loan Conversion under UDAY 0.00 0.00 0.00 0.00 0.00
Closing Balance of loan (Rs. Crs.) 0.00 0.00 0.00 0.00 0.00
Average loan (Rs. Crs.) 0.00 10.50% 0.00 0.00 0.00
Rate of Interest on loan % 0.00 0.00 0.00 0.00 0.00
Loan -REC Medium & Short Term Loan
Gross Loan - Opening (Rs. Crs.) 0.00 350.00 320.83 0.00 0.00
Add: Drawals during the year (Rs. Crs.) 350.00 0.00 -
Less: Repayment of Loan during the year (Rs. Crs.) 0.00 29.17 241.67
Less: Loan Conversion under UDAY 79.16
Closing Balance of loan (Rs. Crs.) 350.00 320.83 0.00 0.00 0.00
Average loan (Rs. Crs.) 175.00 335.42 160.42 0.00 0.00
Rate of Interest on loan % 12.00% 12.00% 12.00% 12.00% 12.00%
Interest on loan (Rs. Crs.) 9.08 42.07 19.25
Loan -REC Short Term Loan
Gross Loan - Opening (Rs. Crs.) 0.00 0.00 0.00 0.00 0.00
Add: Drawals during the year (Rs. Crs.) 0.00 150.00 0.00 0.00 0.00
Less: Repayment of Loan during the year (Rs. Crs.) 0.00 0.00 0.00 0.00 0.00
Less: Loan Conversion under UDAY 0.00 150.00 0.00 0.00 0.00
Closing Balance of loan (Rs. Crs.) 0.00 0.00 0.00 0.00 0.00
Average loan (Rs. Crs.) 12.00% 12.00% 0.00 0.00 0.00
Rate of Interest on loan % 0.00 4.68 0.00 0.00 0.00
Loan -PFC Medium & Short Term Loan
Gross Loan - Opening (Rs. Crs.) 0.00 200.00 0.00 0.00
Add: Drawals during the year (Rs. Crs.) 0.00 1,300.00 0.00 0.00
Less: Repayment of Loan during the year (Rs. Crs.) 0.00 347.85 0.00 0.00
Less: Loan Conversion under UDAY 1,152.15
Closing Balance of loan (Rs. Crs.) 0.00 0.00 0.00 0.00 0.00
Average loan (Rs. Crs.) 0.00 676.08 0.00 0.00
Rate of Interest on loan % 0.00 11.00% 10.25% 10.25%
Interest on loan (Rs. Crs.) 0.00 74.37 - -
Loan -PFC Short Term Loan
Gross Loan - Opening (Rs. Crs.) 0.00 0.00 0.00 0.00 0.00
Add: Drawals during the year (Rs. Crs.) 0.00 200.00 0.00 0.00 0.00
Less: Repayment of Loan during the year (Rs. Crs.) 0.00 0.00 0.00 0.00 0.00
Less: Loan Conversion under UDAY 0.00 200.00 0.00 0.00 0.00
Closing Balance of loan (Rs. Crs.) 0.00 0.00 0.00 0.00 0.00
Average loan (Rs. Crs.) 12.00% 12.00% 0.00 0.00 0.00
Rate of Interest on loan % 0.00 0.00 0.00 0.00
Loan - Hudco PS
Gross Loan - Opening (Rs. Crs.) 71.97 63.17 54.37 0.00 0.00
Add: Drawals during the year (Rs. Crs.) 0.00 0.00 - 0.00 0.00
Less: Repayment of Loan during the year (Rs. Crs.) 8.80 8.80 8.80
Less: Loan Conversion under UDAY (Estimated) 45.57
Closing Balance of loan (Rs. Crs.) 63.17 54.37 0.00 0.00 0.00
Average loan (Rs. Crs.) {(Op Bal + Cl Bal)/2} 67.57 58.77 27.19 0.00 0.00
Rate of Interest on loan % 12.50% 12.50% 12.50% 12.50% 12.50%
MPMKVVCL Annexure-I of ARR/Tariff Petition FY-18
Name of Distribution Licensee : MPMKVVCL BHOPALCalculation of weighted average rate of interest on actual loans Form No: F3a
Amount in Rs. Crores
PY PY CY
FY15 FY16 FY 17 FY 18 FY 19
Type of
Loan (
"PS" or
"WC" )
Particulars
MYT 2016-17 to 2018-19
Interest on loan (Rs. Crs.) 8.5188 7.34 3.40 0.00 0.00
Loan -SSTD/TSP/SCSP (2014-15) & (2015-16)
Gross Loan - Opening (Rs. Crs.) 0.00 178.50 178.50 216.38 288.51
Add: Drawals during the year (Rs. Crs.) 178.50 0.00 37.88 72.13 36.67
Less: Repayment of Loan during the year (Rs. Crs.) 0.00 0.00 - 0.00 0.00
Less: Loan Conversion under FRP -
Closing Balance of loan (Rs. Crs.) 178.50 178.50 216.38 288.51 325.18
Average loan (Rs. Crs.) 89.25 178.50 197.44 252.44 306.84
Rate of Interest on loan % 16.50% 16.50% 14.5%-16.5% 16.50% 16.50%
Interest on loan (Rs. Crs.) 19.98 29.45 42.01 47.60 53.65
Penal Interest 0.00 0.73
Loan -SSTD/TSP/SCSP (2015-16)
Gross Loan - Opening (Rs. Crs.) 0.00 0.00 0.00 0.00 0.00
Add: Drawals during the year (Rs. Crs.) 0.00 62.22 0.00 0.00 0.00
Less: Repayment of Loan during the year (Rs. Crs.) 0.00 0.00 0.00 0.00 0.00
Less: Loan Conversion under UDAY 0.00 62.22 0.00 0.00 0.00
Closing Balance of loan (Rs. Crs.) 0.00 0.00 0.00 0.00 0.00
Average loan (Rs. Crs.) 0.00 16.50% 0.00 0.00 0.00
Rate of Interest on loan % 0.00 2.78 0.00 0.00 0.00
Penal Interest 0.00 0.00 0.00 0.00 0.00
Loan - ADB Loans (GOMP)
Gross Loan - Opening (Rs. Crs.) 51.55 51.55 51.55 51.55 51.55
Add: Drawals during the year (Rs. Crs.) 0.00 0.00 - 0.00 0.00
Less: Repayment of Loan during the year (Rs. Crs.) 0.00 0.00 - 0.00 0.00
Less: Loan Conversion under UDAY -
Closing Balance of loan (Rs. Crs.) 51.55 51.55 51.55 51.55 51.55
Average loan (Rs. Crs.) 51.55 51.55 51.55 51.55 51.55
Rate of Interest on loan % 10.63% 10.63% 10.5% to 12% 10.63% 10.63%
Interest on loan (Rs. Crs.) 5.4811 5.4811 6.18 5.71 5.79
Penal Interest 0.54 0.6216
Loan - Working Capital Loan 2014-15
Gross Loan - Opening (Rs. Crs.) 0.00 695.36 695.36 695.36 695.36
Add: Drawals during the year (Rs. Crs.) 695.36 0.00 0.00 0.00 0.00
Less: Repayment of Loan during the year (Rs. Crs.) 0.00 0.00 0.00 0.00 0.00
Less: Loan Conversion under UDAY 0.00
Closing Balance of loan (Rs. Crs.) 695.36 695.36 695.36 695.36 695.36
Average loan (Rs. Crs.) 347.68 695.36 695.36 695.36 695.36
Rate of Interest on loan % 14.50% 14.50% 14.50% 14.50% 14.50%
Interest on loan (Rs. Crs.) 41.20 100.83 106.57 100.83 100.83
Penal Interest 0.00 3.13
Loan - Working Capital Loan 2015-16
Gross Loan - Opening (Rs. Crs.) 0.00 0.00 339.06 339.06 339.06
MPMKVVCL Annexure-I of ARR/Tariff Petition FY-18
Name of Distribution Licensee : MPMKVVCL BHOPALCalculation of weighted average rate of interest on actual loans Form No: F3a
Amount in Rs. Crores
PY PY CY
FY15 FY16 FY 17 FY 18 FY 19
Type of
Loan (
"PS" or
"WC" )
Particulars
MYT 2016-17 to 2018-19
Add: Drawals during the year (Rs. Crs.) 0.00 750.00 0.00 0.00 0.00
Less: Repayment of Loan during the year (Rs. Crs.) 0.00 0.00 0.00 0.00 0.00
Less: Loan Conversion under UDAY 0.00
Closing Balance of loan (Rs. Crs.) 0.00 750.00 339.06 339.06 339.06
Average loan (Rs. Crs.) 0.00 375.00 339.06 339.06 339.06
Rate of Interest on loan % 0.00 10.00% SBI Base Rate 10.00% 10.00%
Interest on loan (Rs. Crs.) 0.00 21.67 33.09 33.91 33.91
Penal Interest 0.00 0.00
Loan - Working Capital Loan 2016-17
Gross Loan - Opening (Rs. Crs.) 0.00 0.00 204.11 204.11
Add: Drawals during the year (Rs. Crs.) 0.00 204.11 0.00 0.00
Less: Repayment of Loan during the year (Rs. Crs.) 0.00 0.00 0.00 0.00
Less: Loan Conversion under UDAY 0.00
Closing Balance of loan (Rs. Crs.) 0.00 0.00 204.11 204.11 204.11
Average loan (Rs. Crs.) 0.00 102.06 204.11 204.11
Rate of Interest on loan % 0.00 SBI Base Rate 10% 10%
Interest on loan (Rs. Crs.) 0.00 13.21 6.61 9.91
Penal Interest 0.00
Loan - Perpetual Loan (I)
Gross Loan - Opening (Rs. Crs.) 4485.72 4510.96 8845.86 9354.74 9354.74
Add: Drawals during the year (Rs. Crs.) 25.25 0.00 508.88 0.00 0.00
Less: Repayment of Loan during the year (Rs. Crs.) 0.00 0.00 0.00 0.00 0.00
Less: Loan Conversion under UDAY 0.00
Closing Balance of loan (Rs. Crs.) 4510.96 4510.96 9354.74 9354.74 9354.74
Average loan (Rs. Crs.) {(Op Bal + Cl Bal)/2} 4498.34 4510.96 9100.30 9354.74 9354.74
Rate of Interest on loan %SBI Base Rate
2018
SBI Base Rate
2018
SBI Base rate
i.e. 10% PA
SBI Base Rate
2018
SBI Base Rate
2018
Interest on loan (Rs. Crs.) 0.00 0.00 0.00 935.47 935.47
Loan - Perpetual Loan (II)
Gross Loan - Opening (Rs. Crs.) 0.00 3848.61
Add: Drawals during the year (Rs. Crs.) 384860.73 486.29
Less: Repayment of Loan during the year (Rs. Crs.) 0.00 0.00
Less: Loan Conversion under UDAY 384860.73 4334.89
Closing Balance of loan (Rs. Crs.) 0.00 0.00 0.00 0.00 0.00
Average loan (Rs. Crs.) {(Op Bal + Cl Bal)/2}SBI Base Rate
2018
SBI Base Rate
2018
Rate of Interest on loan % 0.00 0.00 0.00 0.00 0.00
Total Loan- PS
Gross Loan - Opening (Rs. Crs.) 1757.75 2578.32 2845.17 1649.78 2042.59
Add: Drawals during the year (Rs. Crs) 911.44 485.16 359.35 444.88 408.72
Less: Repayment of Loan during the year (Rs. Crs.) 54.85 156.08 322.71 52.07 77.21
Less: Conversion of loan udner UDAY 36.01 62.22 1232.03 0.00 0.00
Closing Balance of loan (Rs. Crs.) 2578.32 2845.19 1649.78 2042.59 2374.10
Average loan (Rs. Crs.) 6999.74 4026.94 2247.48 1846.19 2208.35
MPMKVVCL Annexure-I of ARR/Tariff Petition FY-18
Name of Distribution Licensee : MPMKVVCL BHOPALCalculation of weighted average rate of interest on actual loans Form No: F3a
Amount in Rs. Crores
PY PY CY
FY15 FY16 FY 17 FY 18 FY 19
Type of
Loan (
"PS" or
"WC" )
Particulars
MYT 2016-17 to 2018-19
Rate of Interest on loan % 2.57% 9.45% 10.94% 7.44% 7.32%
Interest on loan (Rs. Crs.) 180.12 204.61 245.97 137.30 161.71
Penal Interest (Rs. Crs.) 3.97 4.60 0.00 0.00 0.00
Weighted average Rate of Interest on Loans % (incl
GOMP loans)7.14 7.35 14.91 6.72 6.81
MPMKVVCL Annexure-I of ARR/Tariff Petition FY-18
Name of Distribution Licensee : MPMKVVCL BHOPAL
Working Capital Requirements Form No: F4
All figures in Rs Crores
For wheeling activity
Sl. No. Particulars CY
FY17 FY18 FY19
A)1/6th of annual requirement of inventory for 1%
GFA of previous year6.84 7.89 8.85
B) O&M expenses
R&M expenses 136.05 152.59 169.55
A&G expenes 96.58 103.33 110.38
Employee expenses (incl. terminal benefits) 921.58 950.84 1,167.36
B) i) Total of O&M expenses 1,154.21 1,206.76 1,447.29
B) ii) 1/12th of total 96.18 100.56 120.61
C) Receivables
C) i) Annual Revenue from wheeling charges** 3.53 0.21 1.02
C) ii)Receivables equivalent to 2 months average billing
of wheeling charges 0.59 0.04 0.17
D) Total Working capital 103.61 108.49 129.62
(A), B) ii), C) ii))
E) Rate of Interest * 14.05% 13.85% 13.75%
F) Interest on Working capital 14.56 15.03 17.82
For Retail Sale activity
Sl. No. Particulars
FY17 FY18 FY19
A)1/6th of annual requirement of inventory for
previous year1.71 1.97 2.21
B) Receivables
B) i) Annual Revenue from Tariff and charges** 10,652.49 8,605.71 10,098.34
B) ii) Receivables equivalent to 2 months average billing 1,775.41 1,434.29 1,683.06
C) Power Purchase expenses 7,441.37 5,419.66 6,364.72
C) i) 1/12th of power purchase expenses 620.11 451.64 530.39
D Consuner Security Deposit 773.83 849.92 926.01
E) Total Working capital (A+B ii) - C i) - D) 383.18 134.70 228.86
F) Rate of Interest * 14.05% 13.85% 13.75%
G) Interest on Working capital 53.84 18.66 31.47
MYT 2016-17 to 2018-19
MYT 2016-17 to 2018-19
MPMKVVCL Annexure-I of ARR/Tariff Petition FY-18
Name of Distribution Licensee : MPMKVVCL BHOPAL
Repair & Maintenance Expenditure Form No: F5
Amount in Rs. Crore
Sl.No. Particulars CY
Figure in Rs Crore FY17 FY18 FY19
1 Plant and Machinery
Building
Civil Works
Any other items
A Gross R&M expenses
B R&M expenses capitalised
A-B Net R&M expenses 136.05 152.59 169.55
MYT 2016-17 to 2018-19
As per Normative
MPMKVVCL Annexure-I of ARR/Tariff Petition FY-18
Name of Distribution Licensee : MPMKVVCL BHOPAL
Form No: F6
Amount in Rs. Crore
FY17 FY18 FY19
B 1Salaries (Excluding DA, Arrear, Bonus/Ex-Gratia & Terminal Benefits) as per
accounts/Regulations 359.00 370.00 381.00
2 DA as per accounts/DA calculation 471.19 514.30
3 Salary as per 7th pay (Basic) (* 2.57 of Basic of sixth pay) 979.17
4 DA as per 7th pay 88.13
3 Additional Pay (Bonus) 0.21 0.23 0.25
4
5 Addl. Pay & C.Off Encashment 8.84
6 Overtime -
7 Other allowances 16.67
8 Sub-Total: (1 to 5) 496.90 514.53 1,067.55
9 Medical Expenses Reimbursement 0.88 0.97 1.07
10 Travelling Allowance(Conveyance Allowance)
11 Leave Travel Assistance
12 Honorarium/Overtime
13 Incentives/Awards Including That In Partnership Project (Specify Items)
14 Earned Leave Encashment 51.34 54.94 58.78
15 Compensation for injuries,death and damages 0.58 0.74 0.66
16 D.L.I. Board'S Contribution
17 E.D.L.I. Administration Charges
18 E.S.I. Board'S Contribution
19 E.S.I. Administration Charges
20 Payment Under Workman's Compensation 0.64 - -
21 Subsidised Electricity To Employees 4.45 4.89 5.38
22 Any Other Item - - -
23 Interim Relief / Wage Revision (10%) 0.02
24 Sub-Total (7 to 21) 57.91 61.54 65.89
MYT 2016-17 to 2018-19
Employee Cost and Provisions
Particulars
MPMKVVCL Annexure-I of ARR/Tariff Petition FY-18
Name of Distribution Licensee : MPMKVVCL BHOPAL
Form No: F6
Amount in Rs. Crore
FY17 FY18 FY19
MYT 2016-17 to 2018-19
Employee Cost and Provisions
Particulars
25 Staff Welfare Expenses 1.33 1.47 1.61
C Apprentice And Other Training Expenses
D 1Terminal Benefits provision as per Para 34.1 of the tariff regulation read with para 2(ii) &
2(iii) of the terminal benefit regulation
a) Pension Provision 252.19€ 280.75 337.28
b) Gratuity Provision 51.79 57.88 70.28
c) Others 9.45 10.41 12.12
2Terminal Benefits cash outflow -
Discom personnel retired after 31-05-2005 for services rendered after 31-05-2005
a) Pension Payments 162.15 - -
b) Gratuity Payment - - -
Total D 195.52 349.04 419.67
E 1 Bonus/Ex-Gratia - -
2 NPS 4.58 5.27 2.50
3 EPF+GTIS 5.71 6.11 6.54
3 7th Pay DA Arrears 32.00
G 1 Employee expenses capitalised -29.55
2 Employee other credits(Prior period and other credits)
Other Credits to the Employee Cost (Credit) A/C 8.16
Prior period expenses 4.03
Total Employee expenses 921.58 950.84 1,167.36
MPMKVVCL Annexure-I of ARR/Tariff Petition FY-18
Name of Distribution Licensee : MPMKVVCL BHOPAL
Adminstration & General Expenses Form No: F7
Amount in Rs. Crore
S.No. Particulars CY
FY17 FY18 FY19
i) A&G Expenses as per regulation 96.00 103.00 110.00
ii) Rates & Taxes - - -
ii) MPERC fee 0.58 0.33 0.38
Total A&G expenses 96.58 103.33 110.38
MYT 2016-17 to 2018-19
MPMKVVCL Annexure-I of ARR/Tariff Petition FY-18
Name of Distribution Licensee : MPMKVVCL BHOPAL
Return on Equity Form No: F8
All figures in Rs Crores
CY
Sl.No. Particulars FY17 FY18 FY19
A Gross Fixed Assets at the beginning of year (net of consumer contributions) 5,915.34 6,634.42 7,371.75
A1 Opening balance of GFA identified as funded through equity 1,385.89 1,601.61 1,822.81
A2 Opening balance of GFA identified as funded through debt 4,140.74 4,644.09 5,160.22
BProposed capitalisation of assets as per the investment plan (net of consumer
contribution)719.08 737.33 757.11
B1 Proportion of caplitalised assets funded out of equity, internal reserves 860.49 597.39 366.15
B2 Balance Proportion of capitalised assets funded out of project loans (B - B1) 141.41- 139.94 390.96
C1 Normative additional equity (30% of B) 215.72 221.20 227.13
C2 Normative additional debt (70% of B) 503.36 516.13 529.98
D1 Excess / shortfall of additional equity over normative (B1-C1) 644.77 376.19 139.02
D2 Excess / shortfall of additional debt over normative (B2-C2) 644.77- 376.19- 139.02-
E Equity eligible for Return (A1+(C1/2)) OR (A1+(B1/2)), whichever is lower 1,493.75 1,712.21 1,936.37
Return on Equity (16% on E) 239.00 273.95 309.82
Interest at weighted average rate of loan portfolio on additional equity, if D1
> 0*
MYT 2016-17 to 2018-19
MPMKVVCL Annexure-I of ARR/Tariff Petition FY-18
Name of Distribution Licensee: MPMKVVCL BHOPAL
Statement of Sundry Debtors and provision for Bad & Doubtful Debts Form No: F9
All figures in Rs Crores
Sl.No. Particulars CY
FY17 FY18 FY19
1Receivable from customers as at the beginning of
the year4,093.91
2 Revenue billed for the year 33.71
3 Collection for the year
Against current dues 33.37
Against arrears upto previous year 5.65
4Gross receivable from customers as at the end of
the year3,597.05 3,159.97 3,232.21
7 Net Receivables (4-5-6) 3,597.05 3,159.97 3,232.21
MYT 2016-17 to 2018-19
MPMKVVCL Annexure-I of ARR/Tariff Petition FY-18
Name of Distribution Licensee : MPMKVVCL BHOPAL
Extraordinary Items Form No: F10
Amount in Rs. Crore
Sl.No. Particulars PY CY
FY16 FY17 FY18 FY19
1.00 Extraordinary Credits(incl.
subsidies against losses due to natural disasters)
TOTAL CREDITS
2.00 Extraordinary Debits (incl.
subsidies against losses due to natural disasters)
TOTAL DEBITS
Grand Total (1-2)
NIL
MYT 2016-17 to 2018-19
MPMKVVCL Annexure-I of ARR/Tariff Petition FY-18
Name of Distribution Licensee : MPMKVVCL BHOPAL
Net Prior Period Expenses / Income Form F 11
Amount in Rs. Crore
Sl.No. Particulars PY CY
FY16 FY17 FY18 FY19
A Income relating to previous years:
1 Interest income for prior periods - -
2 Income Tax prior period - -
3 Excess Provision for Depreciation - -
4 Excess Provision for Interest and Fin. Charges - -
5 Receipts from consumers - -
6 Other Excess Provision - -
7 Other Income - -
Sub-Total A 0.00 0.00 0.00 0.00
B Expenditure relating to previous years
1 Power Purchase - - -
2 Operating Expenses - -
4 Employee Cost - -
5 Depreciation - -
6 Interest and Finance Charges - -
7 Admn. Expenses - -
8 Withdrawal of Revenue Demand - -
9 Material Related - -
10 Lease/hire purchase charges in assets - -
11 Others - -
Sub-Total B - - - -
Net prior period Credit/(Charges) : A-B 0.00 0.00 0.00 0.00
MYT 2016-17 to 2018-19
MPMKVVCL Annexure-I of ARR/Tariff Petition FY-18
Name of Distribution Licensee : MPMKVVCL BHOPAL
Other expenses / debits / write-offs Form No: F12
All figures in Rs Crores
Sl.No. Particulars PY CY
FY16 FY17 FY18 FY19
1 Material Cost Variance - - - -
2 Provision for bad debts 0.31 73.25 84.78 97.39
3 Bad Debt Written Off/Provided For 65.38 78.94
4 Cost Of Trading & Manufacturing Activities - - - -
5 Net Prior period Charges - - - -
6 Sub-Total 65.69 152.19 84.78 97.39
7 Less Chargeable To Capital Expense - - - -
- - - -
Net Chargeable To Revenue 65.69 152.19 84.78 97.39
MYT 2016-17 to 2018-19
MPMKVVCL Annexure-I of ARR/Tariff Petition FY-18
Name of Distribution Licensee : MPMKVVCL BHOPAL
Income Tax Provisions Form No: F13
All figures in Rs Crores
Sl. No. Particulars PY CY
In Rs Crores FY16 FY17 FY18 FY19
1 Provision Made/Proposed For The Year
2 As Per Return Filed For The Years
3 As Assessed For The Years
4 Credit/Debit Of Assessment Year(S) (Give Details)
Total
NIL
MYT 2016-17 to 2018-19
MPMKVVCL Annexure-I of ARR/Tariff Petition FY-18
Name of Distribution Licensee : MPMKVVCL BHOPAL
Income from investments and other non-tariff income Form No: F14
For retail supply and wheeling activity
Particulars CY
Figure in Rs Crore FY17 FY18 FY19
A Income from Investment, Fixed & Call Deposits
1 Interest Income from Investments - - -
2 Interest on fixed deposits 33.49 35.16 36.92
3 Interest from Banks other than Fixed Deposits 0.22 0.24 0.27
4 Interest on (any other items) 6.56 6.89 7.23
Sub-Total 40.27 42.29 44.42
B Other Non Tariff Income
1 Interest on loans and Advances to staff 0.07 0.08 0.08
2 Interest on Loans and Advances to Licensee - - -
3 Interest on Loans and Advances to Lessors - - -
4 Interest on Advances to Suppliers / Contractors
7 Income/Fee/Collection against staff welfare activities - - -
8 Miscellaneous receipts
9 Meter Rent 42.45 46.70 51.36
10 Recovery from theft of energy
11 Surcharge and Additional Surcharge - -
MYT 2016-17 to 2018-19
MPMKVVCL Annexure-I of ARR/Tariff Petition FY-18
Particulars CY
Figure in Rs Crore FY17 FY18 FY19
MYT 2016-17 to 2018-19
12 Income from Wheeling Charges (against non conventional energy) 3.53 0.21 1.02
13 Misc. charges from consumers 33.41 35.08 36.83
14 Delayed payment surcharge from Retail Sale consumers 510.85 526.18 541.96
15 Unschedule Inter Charge Receivable 12.10 12.34 12.59
16 Deferred income
17 Net gain/(loss) on disposal of stores item 3.28 3.38 3.48
18 VAT Credit 2.84 2.90
19 Utility Charges 13.62
20 Lease Rent 0.06
21 Sale of Tender Forms 0.17 0.19 0.21
22 Other miscellaneous income 49.63 54.59 60.05
23 Liabilities written off -
24 Any other subsidies / grants other than those u/s 65
Sub-Total 672.01 681.64 707.59
Total (A+B) 712.28 723.93 752.02
Other Non tariff income net-off Delayed Payment Surcharge 201.43 197.76 210.05
Other Income Final 201.43 197.76 210.05
MPMKVVCL Annexure-I of ARR/Tariff Petition FY-18
Name of Distribution Licensee : MPMKVVCL BHOPAL
Income from Miscellaneous Charges from consumers Form No: F14a
All figures in Rs Crores
PY CY
FY16 FY17 FY18 FY19
1 Hiring of plants and equipments
2 Testing charges for consumer's equipments
3 Contest fee for billing meters
5 Charges from arranging supply
6 Service connection charges
7 Charges for requisition forms/various booklets etc.
8 Recovery of cost of burnt meters/metering equipments
9 Shifting of connection from one premises to another
10 Supervision charges
11 Compensation charges for theft of energy/malpractices
12 Power block charges
13 Fee for veriification of old dues/records
14 Fee for special meter reading
15 Charges for maintenance of street lights
16
17 Other Miscellaneous and General Charges (specify)
Grand Total
Total for wheeling Activity*
Total for Retail Sale activity*
Miscellaneous Charges, if any, have been included in Other
Income
Fees payable for representing the case and making
appeals before Grievance Redressal Forum
S.No. ParticularsMYT 2016-17 to 2018-19
MPMKVVCL Annexure-I of ARR/Tariff Petition FY-18
Name of Distribution Licensee : MPMKVVCL BHOPAL
Expenses and Income from Business other than Licensed business Form No: F14b
business utilises the assets of Licensed business) All figures in Rs Crores
PY CY MYT 2016-17 to 2018-19
FY16 FY17 FY18 FY19
1 Expenses of other business
2 Total income from other business
3 Income allocated to Licensed business*
4 Total profit / (loss) from other business
5 Total profit / (loss) allocated to Licensed business*
NIL
S.No. Particulars <include description of business>
MPMKVVCL Annexure-I of ARR/Tariff Petition FY-18
Name of Distribution Licensee : MPMKVVCL BHOPAL
Consumer Security Deposit Form No: F15
Amount in Rs. Crore
CY
FY17 FY18 FY19
LT consumers
HT consumers
TOTAL LT + HT 773.83 849.92 926.01
CategoryMYT 2016-17 to 2018-19
MPMKVVCL Annexure-I of ARR/Tariff Petition FY-18
Name of Distribution Licensee : MPMKVVCL BHOPAL
Lease Rental Form F 16
All figures in Rs Crores
PY CY
FY16 FY17 FY18 FY19
Wheeling activity
Retail sale activityNIL
Sl.No. Asset Description
MYT 2016-17 to 2018-19
MPMKVVCL Annexure-I of ARR/Tariff Petition FY-18
Name of Distribution Licensee : MPMKVVCL BHOPAL
T&D Losses in LT and HT system Form No: P1
All Figures in MU
Particulars CY
FY17 FY18 FY19
A Losses in EHT System (400 kV, 220 kV, 132 kV & 66 kV)
1 Scheduled Energy at Ex-Bus 20,407.24 17,298.63 19,951.69
2 Scheduled Energy at Discom Periphery 19,276.73 16,407.88 18,976.65
3 Energy Lost in PGCIL+MP Transco system (2-1) 1130.51 890.76 975.03
4 Total Loss in the Transmission system [3/(2)*100]% 5.86% 5.15% 4.89%
5 Actual Energy Drawl at Discom periphery (at Interface point) 19276.73 16,407.88 18,976.65
6 UI (2-3) 0.00 - -
7 Actual Energy input at Discom periphery (i.e. at outgoing feeders of EHV S/S) 19276.73 16,407.88 18,976.65
8 Energy Lost between interface point and outgoing feeders of EHV s/s [i.e. Bus
loss = (5-7)] 0 - -
9 Total Loss in the Bus of Transmission system [8/(5)*100]% 0.00% 0.00% 0.00%
10 Direct Injection at 33 kV which is not included in scheduled energy - - -
11 Direct Injection at 11 kV which is not included in scheduled energy - - -
12 Total Energy Input at Discom Periphery (7+10+11) 19,276.73 16,407.88 18,976.65
13 Energy sold at this voltage level 1,057.96 1,121.42 1,213.78
14 Energy transmitted to the 33 kV level 18127.68 15,280.34 17,755.77
15 Energy transmitted to the11 kV level 0 - -
16 Energy Lost in EHV feeders feeding EHV Consumers (12-13-14-15) 91.09 6.11 7.11
17 Total Loss in EHV feeders feeding EHV Consumers [16/(12)*100]% 0.04% 0.04% 0.04%
B System Losses At 33 KV
1 Energy injection at 33 kV level from MP Transco EHV s/s 18127.68 15,280.34 17,755.77
2 Direct Injection at 33 kV which is not included in scheduled energy 0.00 - -
3 Total Energy input at 33kV Voltage level (1+2) 18127.68 15,280.34 17,755.77
4 Energy sold at this voltage level 1794.78 1,952.16 2,128.61
5 Energy transmitted to the 11 kV voltage level 15516.25 12,397.61 14,545.84
6 Energy Lost (3-4-5) 816.64 930.57 1,081.33
7 Total Loss in the system [6/(3)*100]% 4.50% 6.09% 6.09%
MYT 2016-17 to 2018-19
MPMKVVCL Annexure-I of ARR/Tariff Petition FY-18
Name of Distribution Licensee : MPMKVVCL BHOPAL
T&D Losses in LT and HT system Form No: P1
All Figures in MU
Particulars CY
FY17 FY18 FY19
MYT 2016-17 to 2018-19
C Losses At 11 KV +LT
1 Energy received into the system from 33 kV system 15516.25 12,397.61 14,545.84
2 Direct Energy injection at 11 kV level from MP Transco EHV s/s 0.00
3 Direct Injection at 11 kV which is not included in scheduled energy 0.00
4 Total Energy input at 11kV Voltage level (1+2+3) 15516.25 12,397.61 14,545.84
5 Energy sold at 11 kV voltage level 198.45 210.82 224.23
6 Energy sold at LT voltage level 9257.95 10,153.73 12,168.79
7 Total Energy sold at 11kV + LT level (5+6) 9456.40 10,364.55 12,393.02
Energy transmitted to the next (lower) voltage level - -
8 Energy Lost (4-7) 6059.85 2,033.07 2,152.82
9 Total Loss in 11kV + LT system [8/(4)*100]% 39.05% 16.40% 14.80%
D LT System Losses
1 Energy received into the system 14858.27
2 Energy sold at this voltage level 9257.95
3 Energy Lost 6059.85
4 Total Loss in the system (3/1)*100% 40.78%
E
1 Energy In (A12) 19276.73 16,407.88 18,976.65
2 Energy Out (A13+B4+C7) 12309.14 13,438.12 15,735.40
3 Total Distribution Losses [(1-2)/(1)*100]% 36.15% 18% 17%
F Overall Losses
1 Total Energy Lost (A3+A8+A16+B6+C8) 8,098.10 3,860.51 4,216.28
2 Energy Out (A13+B4+C7) 12,309.14 13,438.12 15,735.40
3 Total T&D Loss [(1)/(1+2)*100]% 39.68% 22.32% 21.13%
Distribution system losses
MPMKVVCL Annexure-I of ARR/Tariff Petition FY-18
Name of Distribution Licensee : MPMKVVCL BHOPAL
Distribution Losses Form No: P2
Sl.No. Particulars PY CY
Units FY16 FY17 FY18 FY19
1Energy input received by the Discom at all
voltage levelsMU 19,649.34 19,276.73 16,407.88 18,976.65
2Energy sold by the Discom for all
categories of consumersMU 14,723.71 12,309.14 13,438.12 15,735.40
3 Actual Distribution losses in % % 25.07% 36.15% 18.00% 17.00%
4 Normative distribution losses % 25.07% 19.00% 18.00% 17.00%
MYT 2016-17 to 2018-19
MPMKVVCL Annexure-I of ARR/Tariff Petition FY-18
MPMKVVCL BHOPAL
Physical statistics of the network Form P3
Additions
during the
year
Withdrawa
l from
service
At the end
of year
Additions
during the
year
Withdraw
al from
service
At the end
of year
Additions
during the
year
Withdraw
al from
service
At the end
of year
1.00 Length of lines (ckt-km)
- 33kV 795 16,114 611 16,725 451 17,176
- 11kV 8,673 114,498 30,210 144,708 21,160 165,868
- LT 5,427 115,379 15,093 130,472 8,690 139,162
Total 14,895 245,992 45,914 291,906 30,301 322,207
2.00 Number of 33/11kV substations 83 1,172 50 1,222 30 1,252
3.00 No. of Power Transformers 122 2,100 94 2,194 50 2,244
Total MVA capacity of power
transformers620 9,861 470 10,331 250 10,581
3.00Number of Distribution
Transformers19,976 212,630 65,230 277,860 48,748 326,608
Total MVA capacity of
Distribution Trfs.500 10,819 1,710 12,529 1,290 13,819
FY18 FY19
Sl.No Particulars
FY17
MPMKVVCL Annexure-I of ARR/Tariff Petition FY-18
Name of Distribution Licensee : MPMKVVCL BHOPAL
Monthly Projection of Sales Form No: R1
Month MU MU MU MU MU MU
FY 14 FY 15 FY 16 FY 17 FY 18 FY 19
April 780 919 892 937 933 1,046
May 843 991 989 956 999 1,127
June 773 984 981 975 1,025 1,116
July 753 904 990 902 1,001 1,107
August 741 898 965 877 983 1,094
September 798 945 973 891 1,010 1,144
October 931 1,118 1,215 1,158 1,235 1,398
November 1,071 1,139 1,170 1,130 1,328 1,504
December 1,231 1,160 1,549 1,184 1,362 1,543
January 1,091 1,231 1,474 1,486 1,292 1,463
February 1,102 1,125 1,406 1,406 1,231 1,394
March 1,443 1,199 1,285 1,508 1,285 1,456
Total 11,557 12,613 13,891 13,409 13,685 15,393
Monthly Projection of Losses - excluding MPTransCo Losses
Month % % % % % %
FY 14 FY 15 FY 16 FY 17 FY 18 FY 19
April 36.85% 29.00% 26.76% 42.66% 22.90% 21.90%
May 38.96% 29.77% 29.06% 39.29% 23.27% 22.27%
June 27.95% 25.03% 20.19% 33.44% 16.04% 15.04%
July 32.14% 23.59% 21.89% 35.76% 16.56% 15.56%
August 34.06% 26.16% 26.27% 37.48% 19.30% 18.30%
September 42.03% 29.11% 31.43% 44.40% 25.11% 24.11%
October 30.31% 24.59% 27.34% 29.00% 17.27% 16.27%
November 40.16% 25.82% 25.86% 38.34% 21.90% 20.90%
December 36.09% 23.03% 25.73% 40.54% 21.09% 20.09%
January 25.06% 20.62% 24.57% 36.06% 16.73% 15.73%
February 16.50% 24.54% 22.72% 31.31% 11.72% 10.72%
March -11.62% 11.92% 17.95% 24.55% 4.11% 3.11%
Total 29.04% 24.43% 24.98% 36.07% 18.00% 17.00%
Monthly Projection of Requirement at State Boundary
MU MU MU
April 1,659 1,244 1,408
May 1,574 1,339 1,524
June 1,494 1,254 1,380
July 1,457 1,234 1,378
August 1,485 1,252 1,408
September 1,713 1,347 1,583
October 1,691 1,491 1,755
November 1,858 1,699 1,998
December 1,922 1,725 2,029
January 1,842 1,549 1,824
February 1,708 1,393 1,641
March 1,566 1,339 1,578
Total 19,968 16,865 19,505
MonthFY 17 FY 18 FY 19
MPMKVVCL Annexure-I of ARR/Tariff Petition FY-18
Name of Distribution Licensee : MPMKVVCL BHOPAL
Summary of Actual / estimated Revenue from sale of power
Particulars CY
FY17 FY18 FY19
LOW TENSION 5316.48 6158.75 7250.62
LV 1: DOMESTIC 2036.65 2401.14 2914.32
LV 2: NON-DOMESTIC 669.70 777.69 851.32
LV 3: PUBLIC WATER WORKS AND STREET LIGHTS 177.09 212.17 223.26
LV 4: LT INDUSTRY 210.03 251.21 267.48
LV 5: IRRIGATION PUMP FOR AGRICULTURE 2223.01 2516.54 2994.25
HIGH TENSION 2008.51 2319.61 2488.12
HV 1: RAILWAY TRACTION 0.00 0.00 10.88
HV 2: COAL MINES 26.09 19.87 19.87
HV-3: INDUSTRIAL AND NON-INDUSTRIAL 1784.73 2058.12 2194.05
HV-4: SEASONAL 1.61 2.05 2.09
HV-5: HT IRRIGATION AND WATER WORKS 101.32 135.64 155.04
HV 6: BULK RESIDENTIAL USERS 94.42 103.45 105.71
HV 7: BULK SUPPLY TO EXEMPTEES 0.33 0.47 0.49
GRAND TOTAL HT + LT 7324.99 8478.36 9738.74
MYT 2016-17 to 2018-19
MPMKVVCL Annexure-I of ARR/Tariff Petition FY-18
Name of Distribution Licensee : MPMKVVCL BHOPAL
Revenue from Current Tariff & Charges for LT consumers in urban area
Form R3
CY
FY17 FY18 FY19
LOW TENSION
LV 1: DOMESTIC
Metered
Basic Rate
0 to 30 Units Consumers Nos. 160,010 129,306 133,689
Connected Load KW 234,841.00 201,889.72 208,731.91
Sales MU 19.08 25.60 26.47
Revenue from Fixed Charges Rs. Crs. 6.47 0.00 0.00
Revenue from Variable Charges Rs. Crs. 9.55 7.94 8.21
Total Revenue Rs. Crs. 17.19 7.94 8.21
Upto 50 units
Consumers Nos. 230,828 173,905 179,798
Connected Load KW 227,680.00 156,321.39 161,619.24
Sales MU 155.97 57.39 59.33
Revenue from Fixed Charges Rs. Crs. 18.21 10.43 10.79
Revenue from Variable Charges Rs. Crs. 64.70 22.09 22.84
Total Revenue Rs. Crs. 83.79 32.53 33.63
51 to 100 units
Consumers Nos. 374,880 282,462 292,035
Connected Load KW 487,007.00 344,067.69 355,728.41
Sales MU 301.90 186.42 192.74
Revenue from Fixed Charges Rs. Crs. 29.50 30.51 31.54
Revenue from Variable Charges Rs. Crs. 119.06 73.21 75.70
Total Revenue Rs. Crs. 149.15 103.72 107.24
101 to 300 units
Consumers Nos. 393,647 433,990 448,698
Particulars Parameter MYT 2016-17 to 2018-19Unit of
measurement
MPMKVVCL Annexure-I of ARR/Tariff Petition FY-18
Name of Distribution Licensee : MPMKVVCL BHOPAL
Revenue from Current Tariff & Charges for LT consumers in urban area
Form R3
CY
FY17 FY18 FY19
Particulars Parameter MYT 2016-17 to 2018-19Unit of
measurement
Connected Load KW 620,771.00 616,369.56 637,258.80
Sales MU 760.04 859.30 888.42
Revenue from Fixed Charges Rs. Crs. 108.12 114.57 118.46
Revenue from Variable Charges Rs. Crs. 342.75 425.74 440.17
Total Revenue Rs. Crs. 453.21 540.32 558.63
Above 300 units
Consumers Nos. 168,130 358,526 370,677
Connected Load KW 388,812.00 739,524.58 764,587.64
Sales MU 1,209.02 1,431.22 1,514.70
Revenue from Fixed Charges Rs. Crs. 159.84 209.91 222.16
Revenue from Variable Charges Rs. Crs. 642.89 788.73 837.50
Total Revenue Rs. Crs. 806.28 998.64 1,059.65
Consumers Nos. 0 0 0
Connected Load KW 0.00 0.00 0.00
Sales MU 0.00 0.00 0.00
Revenue from Fixed Charges Rs. Crs. 0.00 0.00 0.00
Revenue from Variable Charges Rs. Crs. 0.00 0.00 0.00
Total Revenue Rs. Crs. 0.00 0.00 0.00
Sub-Total General
Consumers Nos. 1,327,495 1,378,189 1,424,897
Connected Load KW 1,959,111.00 2,058,172.93 2,127,926.01
Sales MU 2,446.01 2,559.93 2,681.67
Revenue from Fixed Charges Rs. Crs. 322.14 365.43 382.94
Revenue from Variable Charges Rs. Crs. 1,178.95 1,317.72 1,384.41
Total Revenue Rs. Crs. 1,509.63 1,683.14 1,767.35
Temporary
MPMKVVCL Annexure-I of ARR/Tariff Petition FY-18
Name of Distribution Licensee : MPMKVVCL BHOPAL
Revenue from Current Tariff & Charges for LT consumers in urban area
Form R3
CY
FY17 FY18 FY19
Particulars Parameter MYT 2016-17 to 2018-19Unit of
measurement
Consumers Nos. 7,394 7,394 7,394
Connected Load KW 12,794.00 10,639.77 10,639.77
Sales MU 20.07 20.07 20.07
Revenue from Fixed Charges Rs. Crs. 4.49 1.51 1.51
Revenue from Variable Charges Rs. Crs. 12.68 13.65 13.65
Total Revenue Rs. Crs. 17.18 15.16 15.16
supply through DTR meter for jhuggi/
jhopdi
Consumers Nos. 0 0 0
Connected Load KW 0.00 0.00 0.00
Sales MU 0.00 0.00 0.00
Revenue from Fixed Charges Rs. Crs. 0.00 0.00 0.00
Revenue from Variable Charges Rs. Crs. 0.00 0.00 0.00
Total Revenue Rs. Crs. 0.00 0.00 0.00
un- metered Consumers Nos. 673 0 0
Connected Load KW 286.00 0.00 0.00
Sales MU 0.79 0.00 0.00
Revenue from Fixed Charges Rs. Crs. 0.06 0.00 0.00
Revenue from Variable Charges Rs. Crs. 0.33 0.00 0.00
Total Revenue Rs. Crs. 0.45 0.00 0.00
Total - LV 1 Domestic
Consumers Nos. 1,335,562 1,385,583 1,432,291
Connected Load KW 1,972,191.00 2,068,812.70 2,138,565.78
Sales MU 2,466.88 2,580.00 2,701.74
Revenue from Fixed Charges Rs. Crs. 326.68 366.94 384.45
Revenue from Variable Charges Rs. Crs. 1,191.97 1,331.37 1,398.06
MPMKVVCL Annexure-I of ARR/Tariff Petition FY-18
Name of Distribution Licensee : MPMKVVCL BHOPAL
Revenue from Current Tariff & Charges for LT consumers in urban area
Form R3
CY
FY17 FY18 FY19
Particulars Parameter MYT 2016-17 to 2018-19Unit of
measurement
Total Revenue Rs. Crs. 1,527.26 1,698.30 1,782.51
LV 2.1
sanctioned load based tariff
Consumers Nos. 5,896 5,989 6,201
Connected Load KW 14,488.00 14,634.66 15,941.46
Sales MU 35.91 33.46 36.91
Revenue from Fixed Charges Rs. Crs. 1.92 2.28 2.49
Revenue from Variable Charges Rs. Crs. 24.13 20.41 22.51
Total Revenue Rs. Crs. 26.71 22.69 25.00
demand based tariff for for CD above 10
kw
Consumers Nos. 696 758 785
Connected Load KW 17,388.00 18,966.52 20,660.12
Sales MU 20.30 23.20 25.59
Revenue from Fixed Charges Rs. Crs. 3.34 5.46 5.95
Revenue from Variable Charges Rs. Crs. 12.26 14.15 15.61
Total Revenue Rs. Crs. 16.12 19.62 21.56
LV 2.2: NON-DOMESTIC
0 to 50 Units
Consumers Nos. 101,056 84,138 87,660
Connected Load KW 122,125.00 111,916.05 122,363.52
Sales MU 29.42 27.45 31.13
Revenue from Fixed Charges Rs. Crs. 7.67 9.40 10.28
Revenue from Variable Charges Rs. Crs. 23.88 17.02 19.30
Total Revenue Rs. Crs. 32.17 26.42 29.58
MPMKVVCL Annexure-I of ARR/Tariff Petition FY-18
Name of Distribution Licensee : MPMKVVCL BHOPAL
Revenue from Current Tariff & Charges for LT consumers in urban area
Form R3
CY
FY17 FY18 FY19
Particulars Parameter MYT 2016-17 to 2018-19Unit of
measurement
Above 50 units
Consumers Nos. 104,134 127,770 132,293
Connected Load KW 222,005.00 257,576.53 280,576.67
Sales MU 343.06 355.85 392.46
Revenue from Fixed Charges Rs. Crs. 31.69 35.55 38.72
Revenue from Variable Charges Rs. Crs. 238.17 254.13 280.90
Total Revenue Rs. Crs. 273.06 289.67 319.62
Demand based tariff for for CD above 10
kw
Consumers Nos. 10,973 11,987 12,412
Connected Load KW 223,518.00 249,964.38 272,284.80
Sales MU 254.17 311.74 343.82
Revenue from Fixed Charges Rs. Crs. 42.57 78.61 85.63
Revenue from Variable Charges Rs. Crs. 156.80 199.48 220.01
Total Revenue Rs. Crs. 200.35 278.09 305.64
Sub-Total General
Consumers Nos. 222,755 230,641 239,350
Connected Load KW 599,524.00 653,058.14 711,826.57
Sales MU 682.86 751.71 829.90
Revenue from Fixed Charges Rs. Crs. 87.19 131.30 143.07
Revenue from Variable Charges Rs. Crs. 455.25 505.20 558.33
Total Revenue Rs. Crs. 548.40 636.50 701.39
Temporary
Consumers Nos. 4,281 4,383 4,383
Connected Load KW 40,173.00 41,130.17 41,130.17
Sales MU 34.07 34.88 34.88
MPMKVVCL Annexure-I of ARR/Tariff Petition FY-18
Name of Distribution Licensee : MPMKVVCL BHOPAL
Revenue from Current Tariff & Charges for LT consumers in urban area
Form R3
CY
FY17 FY18 FY19
Particulars Parameter MYT 2016-17 to 2018-19Unit of
measurement
Revenue from Fixed Charges Rs. Crs. 8.01 11.72 11.72
Revenue from Variable Charges Rs. Crs. 28.02 29.65 29.65
Total Revenue Rs. Crs. 34.73 41.37 41.37
LV-2.3: School Flat Rate
Consumers Nos. 0 0 0
Connected Load KW 0.00 0.00 0.00
Sales MU 0.00 0.00 0.00
Revenue from Fixed Charges Rs. Crs. 0.00 0.00 0.00
Revenue from Variable Charges Rs. Crs. 0.00 0.00 0.00
Total Revenue Rs. Crs. 0.00 0.00 0.00
Total LV 2 Non-Domestic
Consumers Nos. 227,036 235,024 243,733
Connected Load KW 639,697.00 694,188.31 752,956.74
Sales MU 716.93 786.58 864.78
Revenue from Fixed Charges Rs. Crs. 95.20 143.03 154.79
Revenue from Variable Charges Rs. Crs. 483.27 534.84 587.97
Total Revenue Rs. Crs. 583.14 677.87 742.76
LV 3: PUBLIC WATER WORKS AND STREET LIGHTS
PUBLIC WATER WORKS
Municipal Corporation/ Cantonment
Board
Consumers Nos. 3,485 3,649 3,687
Connected Load KW 24,952.00 26,563.49 27,226.93
Sales MU 83.48 97.59 100.01
Revenue from Fixed Charges Rs. Crs. 6.08 7.65 7.84
Revenue from Variable Charges Rs. Crs. 37.77 50.74 52.00
Total Revenue Rs. Crs. 47.09 58.40 59.84
MPMKVVCL Annexure-I of ARR/Tariff Petition FY-18
Name of Distribution Licensee : MPMKVVCL BHOPAL
Revenue from Current Tariff & Charges for LT consumers in urban area
Form R3
CY
FY17 FY18 FY19
Particulars Parameter MYT 2016-17 to 2018-19Unit of
measurement
Municipality / Nagar Panchayat
Consumers Nos. 2,497 2,552 2,703
Connected Load KW 18,791.00 19,862.84 21,404.00
Sales MU 75.25 81.41 87.77
Revenue from Fixed Charges Rs. Crs. 4.40 5.48 5.91
Revenue from Variable Charges Rs. Crs. 34.27 40.71 43.88
Total Revenue Rs. Crs. 39.02 46.19 49.79
Gram Panchayat
Consumers Nos. 0 0 0
Connected Load KW 0.00 0.00 0.00
Sales MU 0.00 0.00 0.00
Revenue from Fixed Charges Rs. Crs. 0.00 0.00 0.00
Revenue from Variable Charges Rs. Crs. 0.00 0.00 0.00
Total Revenue Rs. Crs. 0.00 0.00 0.00
Sub-Total General
Consumers Nos. 5,982 6,201 6,390
Connected Load KW 43,743.00 46,426.32 48,630.93
Sales MU 158.73 179.00 187.77
Revenue from Fixed Charges Rs. Crs. 10.47 13.13 13.75
Revenue from Variable Charges Rs. Crs. 72.04 91.45 95.89
Total Revenue Rs. Crs. 86.11 104.58 109.63
Temporary
Consumers Nos. 168 147 146
Connected Load KW 1,279.97 1,137.22 1,128.78
Sales MU 2.42 2.99 2.97
Revenue from Fixed Charges Rs. Crs. 0.18 0.42 0.41
Revenue from Variable Charges Rs. Crs. 1.40 1.99 1.97
Total Revenue Rs. Crs. 1.62 2.40 2.39
MPMKVVCL Annexure-I of ARR/Tariff Petition FY-18
Name of Distribution Licensee : MPMKVVCL BHOPAL
Revenue from Current Tariff & Charges for LT consumers in urban area
Form R3
CY
FY17 FY18 FY19
Particulars Parameter MYT 2016-17 to 2018-19Unit of
measurement
Sub-Total Public Water Works
Consumers Nos. 6,150 6,348 6,536
Connected Load KW 45,022.97 47,563.55 49,759.70
Sales MU 161.15 181.99 190.75
Revenue from Fixed Charges Rs. Crs. 10.65 13.55 14.16
Revenue from Variable Charges Rs. Crs. 73.44 93.44 97.86
Total Revenue Rs. Crs. 87.73 106.99 112.02
STREET LIGHTS (incl. Traffic Signals)
Municipal Corporation/ Cantonment
Board
Consumers Nos. 1,303 1,377 1,454
Connected Load KW 13,372.00 14,321.40 15,134.59
Sales MU 46.65 52.44 55.42
Revenue from Fixed Charges Rs. Crs. 4.79 6.01 6.36
Revenue from Variable Charges Rs. Crs. 21.88 27.27 28.82
Total Revenue Rs. Crs. 27.21 33.29 35.18
Municipality / Nagar Panchayat
Consumers Nos. 777 802 828
Connected Load KW 12,093.00 14,005.69 14,462.53
Sales MU 50.20 58.21 60.10
Revenue from Fixed Charges 4.24 5.38 5.55
Revenue from Variable Charges 23.08 29.11 30.05
Total Revenue Rs. Crs. 27.17 34.48 35.61
Gram Panchayat
Consumers Nos. 0 0 0
Connected Load KW 0.00 0.00 0.00
Sales MU 0.00 0.00 0.00
Revenue from Fixed Charges Rs. Crs. 0.00 0.00 0.00
MPMKVVCL Annexure-I of ARR/Tariff Petition FY-18
Name of Distribution Licensee : MPMKVVCL BHOPAL
Revenue from Current Tariff & Charges for LT consumers in urban area
Form R3
CY
FY17 FY18 FY19
Particulars Parameter MYT 2016-17 to 2018-19Unit of
measurement
Revenue from Variable Charges Rs. Crs. 0.00 0.00 0.00
Total Revenue Rs. Crs. 0.00 0.00 0.00
Sub-Total Street Lights
Consumers Nos. 2,080 2,179 2,283
Connected Load KW 25,465.00 28,327.09 29,597.12
Sales MU 96.85 110.66 115.53
Revenue from Fixed Charges Rs. Crs. 9.03 11.39 11.91
Revenue from Variable Charges Rs. Crs. 44.97 56.38 58.87
Total Revenue Rs. Crs. 54.39 67.77 70.78
Total - LV 3 PWW and Street Lights
Consumers Nos. 8,230 8,527 8,819
Connected Load KW 70,487.97 75,890.64 79,356.82
Sales MU 258.00 292.65 306.27
Revenue from Fixed Charges Rs. Crs. 19.68 24.94 26.07
Revenue from Variable Charges Rs. Crs. 118.41 149.82 156.73
Total Revenue Rs. Crs. 142.12 174.76 182.81
LV 4: LT INDUSTRY
Non Seasonal -Upto 20 HP
Consumers Nos. 17,349 17,479 17,580
Connected Load KW 125,072.00 126,805.14 128,340.36
Sales MU 97.23 108.06 111.69
Revenue from Fixed Charges Rs. Crs. 29.94 30.35 19.66
Revenue from Variable Charges Rs. Crs. 42.87 47.65 27.32
Total Revenue Rs. Crs. 72.81 78.00 46.98
Non Seasonal -21 Hp to 150 Hp
Consumers Nos. 2,069 2,149 2,234
Connected Load KW 91,516.00 95,905.13 100,743.41
MPMKVVCL Annexure-I of ARR/Tariff Petition FY-18
Name of Distribution Licensee : MPMKVVCL BHOPAL
Revenue from Current Tariff & Charges for LT consumers in urban area
Form R3
CY
FY17 FY18 FY19
Particulars Parameter MYT 2016-17 to 2018-19Unit of
measurement
Sales MU 95.78 109.45 122.08
Revenue from Fixed Charges Rs. Crs. 31.29 32.79 50.25
Revenue from Variable Charges Rs. Crs. 60.34 68.95 108.25
Total Revenue Rs. Crs. 91.64 101.74 158.50
Seasonal -Upto 20 HP
Consumers Nos. 11 11 11
Connected Load KW 111.00 111.00 117.38
Sales MU 0.13 0.51 0.00
Revenue from Fixed Charges Rs. Crs. 0.03 0.02 0.00
Revenue from Variable Charges Rs. Crs. 0.07 0.22 0.00
Total Revenue Rs. Crs. 0.08 0.25 0.00
Seasonal -21 Hp to 150 Hp
Consumers Nos. 15 15 15
Connected Load KW 913.00 919.13 973.41
Sales MU 1.51 1.61 1.75
Revenue from Fixed Charges Rs. Crs. 0.30 0.35 0.37
Revenue from Variable Charges Rs. Crs. 0.91 1.34 1.50
Total Revenue Rs. Crs. 1.25 1.69 1.88
Sub-Total General
Consumers Nos. 19,444 19,654 19,840
Connected Load KW 217,612.00 223,740.40 230,174.56
Sales MU 194.65 219.64 236.15
Revenue from Fixed Charges Rs. Crs. 49.92 68.33 70.29
Revenue from Variable Charges Rs. Crs. 108.62 127.48 137.07
Total Revenue Rs. Crs. 166.93 195.80 207.36
Temporary
Consumers Nos. 11 20 20
Connected Load KW 169.00 307.27 307.27
MPMKVVCL Annexure-I of ARR/Tariff Petition FY-18
Name of Distribution Licensee : MPMKVVCL BHOPAL
Revenue from Current Tariff & Charges for LT consumers in urban area
Form R3
CY
FY17 FY18 FY19
Particulars Parameter MYT 2016-17 to 2018-19Unit of
measurement
Sales MU 0.17 0.31 0.31
Revenue from Fixed Charges Rs. Crs. 0.04 0.12 0.12
Revenue from Variable Charges Rs. Crs. 0.13 0.23 0.23
Total Revenue Rs. Crs. 0.19 0.36 0.36
Total LV 4 LT Industrial
Consumers Nos. 19,455 19,674 19,860
Connected Load KW 217,781.00 224,047.68 230,481.83
Sales MU 194.82 219.95 236.46
Revenue from Fixed Charges Rs. Crs. 49.97 68.45 70.41
Revenue from Variable Charges Rs. Crs. 108.75 127.71 137.30
Total Revenue Rs. Crs. 167.11 196.16 207.71
5.3 For other than agriculture use
Upto 25 HP in Urban Area
Consumers Nos. 111.20 129.26 145.18
Connected Load KW 573.00 639.87 698.57
Sales MU 1.06 1.53 1.64
Revenue from Fixed Charges Rs. Crs. 0.07 0.09 0.10
Revenue from Variable Charges Rs. Crs. 0.52 0.75 0.80
Total Revenue Rs. Crs. 1 1 1
Demand base Tariff Upto 100HP- urban
area
Consumers Nos. 5 5 5
Connected Load KW 144.00 144.00 144.00
Sales MU 0.22 0.16 0.16
Revenue from Fixed Charges Rs. Crs. 0.00 0.04 0.04
Revenue from Variable Charges Rs. Crs. 0.13 0.09 0.09
MPMKVVCL Annexure-I of ARR/Tariff Petition FY-18
Name of Distribution Licensee : MPMKVVCL BHOPAL
Revenue from Current Tariff & Charges for LT consumers in urban area
Form R3
CY
FY17 FY18 FY19
Particulars Parameter MYT 2016-17 to 2018-19Unit of
measurement
Total Revenue Rs. Crs. 0.10 0.13 0.13
Temporary Connections Urban area
Consumers Nos. 5 5 5
Connected Load KW 10.00 4.00 4.00
Sales MU 0.05 0.02 0.02
Revenue from Fixed Charges Rs. Crs. 0.00 0.00 0.00
Revenue from Variable Charges Rs. Crs. 0.03 0.02 0.02
Total Revenue Rs. Crs. 0.03 0.02 0.02
Sub-Total
Consumers Nos. 121 139 155
Connected Load KW 727.00 787.87 846.57
Sales MU 1.32 1.71 1.82
Revenue from Fixed Charges Rs. Crs. 0.07 0.13 0.14
Revenue from Variable Charges Rs. Crs. 0.67 0.86 0.91
Total Revenue Rs. Crs. 0.70 0.99 1.05
TOTAL LV 5 AGRICULTURE
Consumers Nos. 121 139 155
Connected Load KW 727.00 787.87 846.57
Sales MU 1.32 1.71 1.82
Revenue from Fixed Charges Rs. Crs. 0.07 0.13 0.14
Revenue from Variable Charges Rs. Crs. 0.67 0.86 0.91
MPMKVVCL Annexure-I of ARR/Tariff Petition FY-18
Name of Distribution Licensee : MPMKVVCL BHOPAL
Revenue from Current Tariff & Charges for LT consumers in urban area
Form R3
CY
FY17 FY18 FY19
Particulars Parameter MYT 2016-17 to 2018-19Unit of
measurement
Total Revenue Rs. Crs. 0.70 0.99 1.05
TOTAL LOW TENSION- URBAN AREA
Consumers Nos. 1,590,404 1,648,947 1,704,858
Connected Load KW 2,900,883.97 3,063,727.19 3,202,207.75
Sales MU 3,637.95 3,880.89 4,111.07
Revenue from Fixed Charges Rs. Crs. 491.59 603.49 635.87
Revenue from Variable Charges Rs. Crs. 1,903.06 2,144.59 2,280.98
Total Revenue Rs. Crs. 2,420.32 2,748.08 2,916.85
MPMKVVCL Annexure-I of ARR/Tariff Petition FY-18
Name of Distribution Licensee : MPMKVVCL BHOPAL
Revenue from Current Tariff & Charges for LT consumers in rural area
Form R4
Particulars ParameterUnit of
measuremen
t
CY
FY17 FY18 FY19
LOW TENSION
LV 1: DOMESTIC
Metered
Basic Rate
0 to 30 Units Consumers Nos. 55,153 50,167 79,676
Connected Load KW 35,357.00 35,721.56 44,858.13
Sales MU 4.51 10.84 17.21
Revenue from Fixed Charges Rs. Crs. 1.33 0.00 0.00
Revenue from Variable Charges Rs. Crs. 1.66 3.36 5.34
Total Revenue Rs. Crs. 4.53 3.36 5.34
Upto 50 units
Consumers Nos. 513,108 1,097,607 2,165,937
Connected Load KW 197,393.00 334,389.30 542,176.79
Sales MU 391.91 290.19 832.69
Revenue from Fixed Charges Rs. Crs. 29.42 46.10 90.97
Revenue from Variable Charges Rs. Crs. 156.64 111.72 320.58
Total Revenue Rs. Crs. 186.36 157.82 411.55
51 to 100 units
Consumers Nos. 430,327 433,908 689,136
Connected Load KW 281,843.00 304,398.47 382,255.02
Sales MU 388.57 312.41 496.18
Revenue from Fixed Charges Rs. Crs. 25.74 33.84 53.75
Revenue from Variable Charges Rs. Crs. 155.69 124.71 198.06
Total Revenue Rs. Crs. 180.55 158.55 251.81
101 to 300 units
Consumers Nos. 70,324 92,126 146,316
MYT 2016-17 to 2018-19
MPMKVVCL Annexure-I of ARR/Tariff Petition FY-18
Name of Distribution Licensee : MPMKVVCL BHOPAL
Revenue from Current Tariff & Charges for LT consumers in rural area
Form R4
Particulars ParameterUnit of
measuremen
t
CY
FY17 FY18 FY19
MYT 2016-17 to 2018-19
Connected Load KW 51,677.00 71,996.55 90,411.24
Sales MU 136.88 198.99 316.04
Revenue from Fixed Charges Rs. Crs. 15.31 22.55 35.82
Revenue from Variable Charges Rs. Crs. 60.61 100.33 159.34
Total Revenue Rs. Crs. 75.80 122.88 195.16
Above 300 units
Consumers Nos. 5,580 7,558 12,004
Connected Load KW 6,405.00 8,772.45 11,016.20
Sales MU 33.53 328.50 345.83
Revenue from Fixed Charges Rs. Crs. 4.00 45.99 48.42
Revenue from Variable Charges Rs. Crs. 18.01 204.57 214.09
Total Revenue Rs. Crs. 22.03 250.56 262.51
above 500 units
Consumers Nos. 0 0 0
Connected Load KW 0.00 0.00 0.00
Sales MU 0.00 0.00 0.00
Revenue from Fixed Charges Rs. Crs. 0.00 0.00 0.00
Revenue from Variable Charges Rs. Crs. 0.00 0.00 0.00
Total Revenue Rs. Crs. 0.00 0.00 0.00
Sub-Total General
Consumers Nos. 1,074,492 1,681,366 3,093,069
Connected Load KW 572,675.00 755,278.33 1,070,717.36
Sales MU 955.39 1,140.93 2,007.94
Revenue from Fixed Charges Rs. Crs. 75.79 148.49 228.96
Revenue from Variable Charges Rs. Crs. 392.60 544.68 897.41
Total Revenue Rs. Crs. 469.26 693.17 1,126.36
Temporary
MPMKVVCL Annexure-I of ARR/Tariff Petition FY-18
Name of Distribution Licensee : MPMKVVCL BHOPAL
Revenue from Current Tariff & Charges for LT consumers in rural area
Form R4
Particulars ParameterUnit of
measuremen
t
CY
FY17 FY18 FY19
MYT 2016-17 to 2018-19
Consumers Nos. 1,210 1,210 1,210
Connected Load KW 2,215.00 2,143.98 2,143.98
Sales MU 0.91 1.63 1.63
Revenue from Fixed Charges Rs. Crs. 0.81 0.11 0.11
Revenue from Variable Charges Rs. Crs. 0.53 1.11 1.11
Total Revenue Rs. Crs. 2.48 1.21 1.21
supply through DTR meter for jhuggi/ jhopdi
Consumers Nos. 0 0 0
Connected Load KW 0.00 0.00 0.00
Sales MU 0.00 0.00 0.00
Revenue from Fixed Charges Rs. Crs. 0.00 0.00 0.00
Revenue from Variable Charges Rs. Crs. 0.00 0.00 0.00
Total Revenue Rs. Crs. 0.00 0.00 0.00
un- metered Consumers Nos. 93,943 93,943 46,972
Connected Load KW 39,033.00 33,237.17 16,618.58
Sales MU 80.21 56.37 28.18
Revenue from Fixed Charges Rs. Crs. 4.78 8.45 4.23
Revenue from Variable Charges Rs. Crs. 32.83 0.00 0.00
Total Revenue Rs. Crs. 37.64 8.45 4.23
Total - LV 1 Domestic
Consumers Nos. 1,169,645 1,776,519 3,141,251
Connected Load KW 613,923.00 790,659.48 1,089,479.93
Sales MU 1,036.51 1,198.92 2,037.76
Revenue from Fixed Charges Rs. Crs. 81.38 157.05 233.29
Revenue from Variable Charges Rs. Crs. 425.96 545.79 898.51
MPMKVVCL Annexure-I of ARR/Tariff Petition FY-18
Name of Distribution Licensee : MPMKVVCL BHOPAL
Revenue from Current Tariff & Charges for LT consumers in rural area
Form R4
Particulars ParameterUnit of
measuremen
t
CY
FY17 FY18 FY19
MYT 2016-17 to 2018-19
Total Revenue Rs. Crs. 509.39 702.84 1,131.80
LV 2.1
sanctioned load based tariff
Consumers Nos. 2,822 3,208 3,404
Connected Load KW 4,248.00 5,346.80 5,770.79
Sales MU 6.86 6.84 7.40
Revenue from Fixed Charges Rs. Crs. 0.48 0.64 0.69
Revenue from Variable Charges Rs. Crs. 4.57 4.17 4.51
Total Revenue Rs. Crs. 5.11 4.81 5.20
demand based tariff for for CD above 10 kw
Consumers Nos. 73 89 94
Connected Load KW 2,360.00 2,549.15 2,751.30
Sales MU 2.05 1.99 2.15
Revenue from Fixed Charges Rs. Crs. 0.32 0.61 0.66
Revenue from Variable Charges Rs. Crs. 1.25 1.21 1.31
Total Revenue Rs. Crs. 1.56 1.82 1.97
LV 2.2: NON-DOMESTIC
0 to 50 Units
Consumers Nos. 7,762 7,194 8,777
Connected Load KW 9,451.00 9,482.72 11,023.68
Sales MU 1.81 1.77 3.53
Revenue from Fixed Charges Rs. Crs. 0.54 0.63 0.73
Revenue from Variable Charges Rs. Crs. 1.50 1.10 2.19
Total Revenue Rs. Crs. 2.22 1.72 2.92
MPMKVVCL Annexure-I of ARR/Tariff Petition FY-18
Name of Distribution Licensee : MPMKVVCL BHOPAL
Revenue from Current Tariff & Charges for LT consumers in rural area
Form R4
Particulars ParameterUnit of
measuremen
t
CY
FY17 FY18 FY19
MYT 2016-17 to 2018-19
Above 50 units
Consumers Nos. 16,304 17,783 18,868
Connected Load KW 35,936.00 36,343.05 39,225.00
Sales MU 63.37 52.97 57.31
Revenue from Fixed Charges Rs. Crs. 4.59 4.36 4.71
Revenue from Variable Charges Rs. Crs. 44.24 37.92 41.05
Total Revenue Rs. Crs. 48.99 42.28 45.76
Demand based tariff for for CD above 10 kw
Consumers Nos. 2,439 2,919 3,098
Connected Load KW 39,825.00 47,634.70 51,412.07
Sales MU 29.55 50.83 54.99
Revenue from Fixed Charges Rs. Crs. 4.67 10.87 11.73
Revenue from Variable Charges Rs. Crs. 18.27 32.53 35.19
Total Revenue Rs. Crs. 23.34 43.40 46.92
Sub-Total General
Consumers Nos. 29,400 31,194 34,241
Connected Load KW 91,820.00 101,356.42 110,182.84
Sales MU 103.63 114.39 125.37
Revenue from Fixed Charges Rs. Crs. 10.60 17.11 18.52
Revenue from Variable Charges Rs. Crs. 69.83 76.93 84.25
Total Revenue Rs. Crs. 81.22 94.04 102.77
Temporary
Consumers Nos. 1,197 1,203 1,203
Connected Load KW 5,347.00 5,458.00 5,458.00
Sales MU 5.21 5.32 5.32
MPMKVVCL Annexure-I of ARR/Tariff Petition FY-18
Name of Distribution Licensee : MPMKVVCL BHOPAL
Revenue from Current Tariff & Charges for LT consumers in rural area
Form R4
Particulars ParameterUnit of
measuremen
t
CY
FY17 FY18 FY19
MYT 2016-17 to 2018-19
Revenue from Fixed Charges Rs. Crs. 0.80 1.26 1.26
Revenue from Variable Charges Rs. Crs. 4.10 4.52 4.52
Total Revenue Rs. Crs. 5.34 5.79 5.79
LV-2.3: School Flat Rate
Consumers Nos. 0 0 0
Connected Load KW 0.00 0.00 0.00
Sales MU 0.00 0.00 0.00
Revenue from Fixed Charges Rs. Crs. 0.00 0.00 0.00
Revenue from Variable Charges Rs. Crs. 0.00 0.00 0.00
Total Revenue Rs. Crs. 0.00 0.00 0.00
Total LV 2 Non-Domestic
Consumers Nos. 30,597 32,397 35,444
Connected Load KW 97,167.00 106,814.42 115,640.84
Sales MU 108.85 119.72 130.70
Revenue from Fixed Charges Rs. Crs. 11.40 18.37 19.78
Revenue from Variable Charges Rs. Crs. 73.93 81.45 88.78
Total Revenue Rs. Crs. 86.56 99.82 108.56
LV 3: PUBLIC WATER WORKS AND STREET LIGHTS
PUBLIC WATER WORKS
Municipal Corporation/ Cantonment Board
Consumers Nos. 0 0 0
Connected Load KW 0.00 0.00 0.00
Sales MU 0.00 0.00 0.00
Revenue from Fixed Charges Rs. Crs. 0.00 0.00 0.00
Revenue from Variable Charges Rs. Crs. 0.00 0.00 0.00
Total Revenue Rs. Crs. 0.00 0.00 0.00
Municipality / Nagar Panchayat
MPMKVVCL Annexure-I of ARR/Tariff Petition FY-18
Name of Distribution Licensee : MPMKVVCL BHOPAL
Revenue from Current Tariff & Charges for LT consumers in rural area
Form R4
Particulars ParameterUnit of
measuremen
t
CY
FY17 FY18 FY19
MYT 2016-17 to 2018-19
Consumers Nos. 0 0 0
Connected Load KW 0.00 0.00 0.00
Sales MU 0.00 0.00 0.00
Revenue from Fixed Charges Rs. Crs. 0.00 0.00 0.00
Revenue from Variable Charges Rs. Crs. 0.00 0.00 0.00
Total Revenue Rs. Crs. 0.00 0.00 0.00
Gram Panchayat
Consumers Nos. 3,734 3,358 3,552
Connected Load KW 17,567.00 17,443.11 18,772.14
Sales MU 60.59 61.86 66.41
Revenue from Fixed Charges Rs. Crs. 1.84 2.09 2.25
Revenue from Variable Charges Rs. Crs. 27.61 30.31 32.54
Total Revenue Rs. Crs. 31.20 32.40 34.80
Sub-Total General
Consumers Nos. 3,734 3,358 3,552
Connected Load KW 17,567.00 17,443.11 18,772.14
Sales MU 60.59 61.86 66.41
Revenue from Fixed Charges Rs. Crs. 1.84 2.09 2.25
Revenue from Variable Charges Rs. Crs. 27.61 30.31 32.54
Total Revenue Rs. Crs. 31.20 32.40 34.80
Temporary
Consumers Nos. 105 80 81
Connected Load KW 514.03 427.27 435.72
Sales MU 0.92 1.03 1.05
Revenue from Fixed Charges Rs. Crs. 0.07 0.07 0.07
Revenue from Variable Charges Rs. Crs. 0.54 0.66 0.67
Total Revenue Rs. Crs. 0.62 0.73 0.74
Sub-Total Public Water Works
MPMKVVCL Annexure-I of ARR/Tariff Petition FY-18
Name of Distribution Licensee : MPMKVVCL BHOPAL
Revenue from Current Tariff & Charges for LT consumers in rural area
Form R4
Particulars ParameterUnit of
measuremen
t
CY
FY17 FY18 FY19
MYT 2016-17 to 2018-19
Consumers Nos. 3,839 3,438 3,633
Connected Load KW 18,081.03 17,870.38 19,207.86
Sales MU 61.51 62.89 67.47
Revenue from Fixed Charges Rs. Crs. 1.91 2.16 2.32
Revenue from Variable Charges Rs. Crs. 28.14 30.97 33.21
Total Revenue Rs. Crs. 31.82 33.13 35.53
STREET LIGHTS (incl. Traffic Signals)
Municipal Corporation/ Cantonment Board
Consumers Nos. 0 0 0
Connected Load KW 0.00 0.00 0.00
Sales MU 0.00 0.00 0.00
Revenue from Fixed Charges Rs. Crs. 0.00 0.00 0.00
Revenue from Variable Charges Rs. Crs. 0.00 0.00 0.00
Total Revenue Rs. Crs. 0.00 0.00 0.00
Municipality / Nagar Panchayat
Consumers Nos. 0 0 0
Connected Load KW 0.00 0.00 0.00
Sales MU 0.00 0.00 0.00
Revenue from Fixed Charges Rs. Crs. 0.00 0.00 0.00
Revenue from Variable Charges Rs. Crs. 0.00 0.00 0.00
Total Revenue Rs. Crs. 0.00 0.00 0.00
Gram Panchayat
Consumers Nos. 680 699 716
Connected Load KW 1,954.00 2,425.41 2,789.27
Sales MU 6.38 8.14 9.35
Revenue from Fixed Charges Rs. Crs. 0.18 0.29 0.33
Revenue from Variable Charges Rs. Crs. 2.96 3.99 4.58
Total Revenue Rs. Crs. 3.15 4.28 4.92
MPMKVVCL Annexure-I of ARR/Tariff Petition FY-18
Name of Distribution Licensee : MPMKVVCL BHOPAL
Revenue from Current Tariff & Charges for LT consumers in rural area
Form R4
Particulars ParameterUnit of
measuremen
t
CY
FY17 FY18 FY19
MYT 2016-17 to 2018-19
Sub-Total Street Lights
Consumers Nos. 680 699 716
Connected Load KW 1,954.00 2,425.41 2,789.27
Sales MU 6.38 8.14 9.35
Revenue from Fixed Charges Rs. Crs. 0.18 0.29 0.33
Revenue from Variable Charges Rs. Crs. 2.96 3.99 4.58
Total Revenue Rs. Crs. 3.15 4.28 4.92
Total - LV 3 PWW and Street Lights
Consumers Nos. 4,519 4,137 4,350
Connected Load KW 20,035.03 20,295.80 21,997.13
Sales MU 67.89 71.03 76.82
Revenue from Fixed Charges Rs. Crs. 2.09 2.45 2.66
Revenue from Variable Charges Rs. Crs. 31.10 34.95 37.79
Total Revenue Rs. Crs. 34.98 37.41 40.45
LV 4: LT INDUSTRY
Upto 25 HP
Consumers Nos. 12,635 12,987 12,094
Connected Load KW 64,332.00 68,029.01 71,938.49
Sales MU 44.23 46.53 48.00
Revenue from Fixed Charges Rs. Crs. 10.30 10.58 5.87
Revenue from Variable Charges Rs. Crs. 20.04 20.60 8.41
Total Revenue Rs. Crs. 30.34 31.18 14.28
Demand Based - CD and CL Up to 100HP
Consumers Nos. 373 418 472
Connected Load KW 16,911.00 18,918.74 21,333.90
Sales MU 12.33 15.30 18.99
Revenue from Fixed Charges Rs. Crs. 3.65 4.08 4.60
MPMKVVCL Annexure-I of ARR/Tariff Petition FY-18
Name of Distribution Licensee : MPMKVVCL BHOPAL
Revenue from Current Tariff & Charges for LT consumers in rural area
Form R4
Particulars ParameterUnit of
measuremen
t
CY
FY17 FY18 FY19
MYT 2016-17 to 2018-19
Revenue from Variable Charges Rs. Crs. 7.76 9.63 11.96
Total Revenue Rs. Crs. 11.41 13.71 16.56
Demand Based - CD 100HP and CL Up to 150HP
Consumers Nos. 0 0 0
Connected Load KW 0.00 0.00 0.00
Sales MU 0.00 0.00 0.00
Revenue from Fixed Charges Rs. Crs. 0.00 0.00 0.00
Revenue from Variable Charges Rs. Crs. 0.00 0.00 0.00
Total Revenue Rs. Crs. 0.00 0.00 0.00
Demand Based - CD 101HP to 150 HP and CL Up to 150HP
Consumers Nos. 17 26 31
Connected Load KW 1,617.00 2,445.23 2,901.27
Sales MU 0.87 2.46 3.21
Revenue from Fixed Charges Rs. Crs. 0.03 0.05 0.06
Revenue from Variable Charges Rs. Crs. 0.54 1.54 2.02
Total Revenue Rs. Crs. 0.90 2.08 2.62
Sub-Total General
Consumers Nos. 13,025 13,431 12,597
Connected Load KW 82,860.00 89,392.99 96,173.66
Sales MU 57.43 64.29 70.20
Revenue from Fixed Charges Rs. Crs. 13.98 14.71 10.53
Revenue from Variable Charges Rs. Crs. 28.34 31.77 22.39
Total Revenue Rs. Crs. 42.65 46.97 33.46
Temporary
Consumers Nos. 37 37 37
Connected Load KW 393.00 606.80 606.80
Sales MU 0.63 0.98 0.98
Revenue from Fixed Charges Rs. Crs. 0.11 0.15 0.15
MPMKVVCL Annexure-I of ARR/Tariff Petition FY-18
Name of Distribution Licensee : MPMKVVCL BHOPAL
Revenue from Current Tariff & Charges for LT consumers in rural area
Form R4
Particulars ParameterUnit of
measuremen
t
CY
FY17 FY18 FY19
MYT 2016-17 to 2018-19
Revenue from Variable Charges Rs. Crs. 0.52 0.74 0.74
Total Revenue Rs. Crs. 0.65 0.89 0.89
Total LV 4 LT Industrial
Consumers Nos. 13,062 13,468 13,888
Connected Load KW 83,253.00 89,999.79 96,780.46
Sales MU 58.06 65.27 71.18
Revenue from Fixed Charges Rs. Crs. 11.37 17.12 18.41
Revenue from Variable Charges Rs. Crs. 28.83 37.94 41.36
Total Revenue Rs. Crs. 42.92 55.05 59.77
5.3 For other than agriculture use
Upto 25 HP in Rural
Area
Consumers Nos. 316 330 337
Connected Load KW 1,404.00 1,457.43 1,510.72
Sales MU 1.75 2.19 2.26
Revenue from Fixed Charges Rs. Crs. 0.13 0.16 0.17
Revenue from Variable Charges Rs. Crs. 0.77 1.03 1.06
Total Revenue Rs. Crs. 0.96 1.19 1.23
Demand base Tariff Upto 100HP- Rural area
Consumers Nos. 16 16 16
Connected Load KW 544.00 544.00 544.00
Sales MU 0.82 0.59 0.59
Revenue from Fixed Charges Rs. Crs. 0.00 0.07 0.07
Revenue from Variable Charges Rs. Crs. 0.47 0.34 0.34
Total Revenue Rs. Crs. 0.49 0.41 0.41
Temporary Connections Rural area
Consumers Nos. 22 22 22
MPMKVVCL Annexure-I of ARR/Tariff Petition FY-18
Name of Distribution Licensee : MPMKVVCL BHOPAL
Revenue from Current Tariff & Charges for LT consumers in rural area
Form R4
Particulars ParameterUnit of
measuremen
t
CY
FY17 FY18 FY19
MYT 2016-17 to 2018-19
Connected Load KW 126.00 93.50 93.50
Sales MU 0.15 0.17 0.17
Revenue from Fixed Charges Rs. Crs. 0.00 0.02 0.02
Revenue from Variable Charges Rs. Crs. 0.07 0.13 0.13
Total Revenue Rs. Crs. 0.10 0.15 0.15
` Sub-Total
Consumers Nos. 354 368 375
Connected Load KW 2,074.00 2,094.93 2,148.22
Sales MU 2.72 2.94 3.02
Revenue from Fixed Charges Rs. Crs. 0.14 0.26 0.26
Revenue from Variable Charges Rs. Crs. 1.31 1.50 1.53
Total Revenue Rs. Crs. 1.55 1.75 1.79
TOTAL LV 5 AGRICULTURE
Consumers Nos. 354 368 375
Connected Load KW 2,074.00 2,094.93 2,148.22
Sales MU 2.72 2.94 3.02
Revenue from Fixed Charges Rs. Crs. 0.14 0.26 0.26
Revenue from Variable Charges Rs. Crs. 1.31 1.50 1.53
Total Revenue Rs. Crs. 1.55 1.75 1.79
TOTAL LOW TENSION- RURAL AREA
Consumers Nos. 1,218,177 1,826,889 3,195,308
Connected Load KW 816,452.03 1,009,864.42 1,326,046.57
Sales MU 1,274.03 1,457.88 2,319.47
Revenue from Fixed Charges Rs. Crs. 106.38 195.25 274.40
Revenue from Variable Charges Rs. Crs. 561.13 701.63 1,067.98
Total Revenue Rs. Crs. 675.40 896.88 1,342.37
MPMKVVCL Annexure-I of ARR/Tariff Petition FY-18
Revenue from Current Tariff & Charges
Form R5
PY CY
FY17 FY18 FY19
LOW TENSION
LV 1: DOMESTIC
Metered
Basic Rate
0 to 30 Units Consumers Nos. 215,163 179,474 213,365
Connected Load KW 270,198.00 237,611.27 253,590.04
Sales MU 23.59 36.44 43.68
Revenue from Fixed Charges Rs. Crs. 7.81 0.00 0.00
Revenue from Variable Charges Rs. Crs. 11.21 11.30 13.54
Total Revenue Rs. Crs. 21.72 11.30 13.54
Upto 50 units
Consumers Nos. 743,936 1,271,511 2,345,736
Connected Load KW 425,073.00 490,710.69 703,796.03
Sales MU 547.88 347.58 892.02
Revenue from Fixed Charges Rs. Crs. 47.63 56.53 101.76
Revenue from Variable Charges Rs. Crs. 221.34 133.82 343.43
Total Revenue Rs. Crs. 270.16 190.35 445.18
51 to 100 units
Consumers Nos. 805,207 716,370 981,171
Connected Load KW 768,850.00 648,466.16 737,983.43
Sales MU 690.47 498.84 688.92
Revenue from Fixed Charges Rs. Crs. 55.23 64.35 85.29
Revenue from Variable Charges Rs. Crs. 274.76 197.92 273.75
Total Revenue Rs. Crs. 329.70 262.27 359.05
101 to 300 units
MYT 2016-17 to
2018-19Particulars Parameter
Unit of
measure-
ment
MPMKVVCL Annexure-I of ARR/Tariff Petition FY-18
Revenue from Current Tariff & Charges
Form R5
PY CY
FY17 FY18 FY19
MYT 2016-17 to
2018-19Particulars Parameter
Unit of
measure-
ment
Consumers Nos. 463,971 526,116 595,014
Connected Load KW 672,448.00 688,366.11 727,670.04
Sales MU 896.92 1,058.29 1,204.46
Revenue from Fixed Charges 123.43 137.13 154.27
Revenue from Variable Charges 403.36 526.07 599.51
101 to 300 units Total Revenue Rs. Crs. 529.01 663.20 753.78
301 to 500 units
Consumers Nos. 173,710 366,085 382,681
Connected Load KW 395,217.00 748,297.03 775,603.84
Sales MU 1,242.55 1,759.71 1,860.53
Revenue from Fixed Charges Rs. Crs. 163.84 255.90 270.57
Revenue from Variable Charges Rs. Crs. 660.90 993.30 1,051.59
Total Revenue Rs. Crs. 828.31 1,249.20 1,322.16
above 500 units
Consumers Nos. 0 0 0
Connected Load KW 0.00 0.00 0.00
Sales MU 0.00 0.00 0.00
Revenue from Fixed Charges Rs. Crs. 0.00 0.00 0.00
Revenue from Variable Charges Rs. Crs. 0.00 0.00 0.00
Total Revenue Rs. Crs. 0.00 0.00 0.00
Sub-Total General
Consumers Nos. 2,401,987 3,059,555 4,517,967
Connected Load KW 2,531,786.00 2,813,451.26 3,198,643.37
Sales MU 3,401.40 3,700.86 4,689.61
Revenue from Fixed Charges Rs. Crs. 397.93 513.91 611.90
Revenue from Variable Charges Rs. Crs. 1,571.56 1,862.40 2,281.82
MPMKVVCL Annexure-I of ARR/Tariff Petition FY-18
Revenue from Current Tariff & Charges
Form R5
PY CY
FY17 FY18 FY19
MYT 2016-17 to
2018-19Particulars Parameter
Unit of
measure-
ment
Total Revenue Rs. Crs. 1,978.90 2,376.31 2,893.72
Temporary
Consumers Nos. 8,604 8,604 8,604
Connected Load KW 15,009.00 12,783.75 12,783.75
Sales MU 20.98 21.70 21.70
Revenue from Fixed Charges Rs. Crs. 5.29 1.62 1.62
Revenue from Variable Charges Rs. Crs. 13.21 14.76 14.76
Total Revenue Rs. Crs. 19.66 16.37 16.37
supply through DTR meter for jhuggi/ jhopdi
Consumers Nos. 0 0 0
Connected Load KW 0.00 0.00 0.00
Sales MU 0.00 0.00 0.00
Revenue from Fixed Charges Rs. Crs. 0.00 0.00 0.00
Revenue from Variable Charges Rs. Crs. 0.00 0.00 0.00
Total Revenue Rs. Crs. 0.00 0.00 0.00
un- metered Consumers Nos. 94,616 93,943 46,972
Connected Load KW 39,319.00 33,237.17 16,618.58
Sales MU 81.00 56.37 28.18
Revenue from Fixed Charges Rs. Crs. 4.83 8.45 4.23
Revenue from Variable Charges Rs. Crs. 33.16 0.00 0.00
Total Revenue Rs. Crs. 38.09 8.45 4.23
Total - LV 1 Domestic
Consumers Nos. 2,505,207 3,162,102 4,573,542
Connected Load KW 2,586,114.00 2,859,472.18 3,228,045.71
MPMKVVCL Annexure-I of ARR/Tariff Petition FY-18
Revenue from Current Tariff & Charges
Form R5
PY CY
FY17 FY18 FY19
MYT 2016-17 to
2018-19Particulars Parameter
Unit of
measure-
ment
Sales MU 3,503.39 3,778.92 4,739.49
Revenue from Fixed Charges Rs. Crs. 408.06 523.98 617.74
Revenue from Variable Charges Rs. Crs. 1,617.93 1,877.16 2,296.57
Total Revenue Rs. Crs. 2,036.65 2,401.14 2,914.32
LV 2.1
sanctioned load based tariff
Consumers Nos. 8,718 9,197 9,605
Connected Load KW 18,736.00 19,981.46 21,712.25
Sales MU 42.77 40.30 44.30
Revenue from Fixed Charges Rs. Crs. 2.40 2.92 3.18
Revenue from Variable Charges Rs. Crs. 28.70 24.58 27.02
Total Revenue Rs. Crs. 31.82 27.51 30.20
demand based tariff for for CD above 10 kw
Consumers Nos. 769 847 879
Connected Load KW 19,748.00 21,515.67 23,411.42
Sales MU 22.35 25.19 27.74
Revenue from Fixed Charges Rs. Crs. 3.66 6.07 6.61
Revenue from Variable Charges Rs. Crs. 13.52 15.37 16.92
Total Revenue Rs. Crs. 17.68 21.44 23.53
LV 2.2: NON-DOMESTIC
0 to 50 Units
Consumers Nos. 108,818 91,332 96,436
Connected Load KW 131,576.00 121,398.76 133,387.21
MPMKVVCL Annexure-I of ARR/Tariff Petition FY-18
Revenue from Current Tariff & Charges
Form R5
PY CY
FY17 FY18 FY19
MYT 2016-17 to
2018-19Particulars Parameter
Unit of
measure-
ment
Sales MU 31.22 29.22 34.66
Revenue from Fixed Charges Rs. Crs. 8.21 10.03 11.01
Revenue from Variable Charges Rs. Crs. 25.38 18.12 21.49
Total Revenue Rs. Crs. 34.38 28.14 32.49
Above 50 units
Consumers Nos. 120,438 145,553 151,161
Connected Load KW 257,941.00 293,919.57 319,801.67
Sales MU 406.43 408.82 449.77
Revenue from Fixed Charges Rs. Crs. 36.28 39.91 43.43
Revenue from Variable Charges Rs. Crs. 282.41 292.05 321.95
Total Revenue Rs. Crs. 322.05 331.95 365.37
Demand based tariff for for CD above 10 kw
Consumers Nos. 13,412 14,907 15,509
Connected Load KW 263,343.00 297,599.09 323,696.87
Sales MU 283.72 362.57 398.81
Revenue from Fixed Charges Rs. Crs. 47.24 89.48 97.36
Revenue from Variable Charges Rs. Crs. 175.07 232.01 255.20
Total Revenue Rs. Crs. 223.69 321.49 352.56
Sub-Total General
Consumers Nos. 252,155 261,835 273,590
Connected Load KW 691,344.00 754,414.55 822,009.41
Sales MU 786.49 866.10 955.28
Revenue from Fixed Charges Rs. Crs. 97.79 148.41 161.59
Revenue from Variable Charges Rs. Crs. 525.07 582.12 642.58
MPMKVVCL Annexure-I of ARR/Tariff Petition FY-18
Revenue from Current Tariff & Charges
Form R5
PY CY
FY17 FY18 FY19
MYT 2016-17 to
2018-19Particulars Parameter
Unit of
measure-
ment
Total Revenue Rs. Crs. 629.62 730.54 804.16
Temporary
Consumers Nos. 5,478 5,586 5,586
Connected Load KW 45,520.00 46,588.17 46,588.17
Sales MU 39.28 40.20 40.20
Revenue from Fixed Charges Rs. Crs. 8.81 12.98 12.98
Revenue from Variable Charges Rs. Crs. 32.12 34.17 34.17
Total Revenue Rs. Crs. 40.07 47.15 47.15
LV-2.3: School Flat Rate
Consumers Nos. 0 0 0
Connected Load KW 0.00 0.00 0.00
Sales MU 0.00 0.00 0.00
Revenue from Fixed Charges Rs. Crs. 0.00 0.00 0.00
Revenue from Variable Charges Rs. Crs. 0.00 0.00 0.00
Total Revenue Rs. Crs. 0.00 0.00 0.00
Total LV 2 Non-Domestic
Consumers Nos. 257,633 267,421 279,176
Connected Load KW 736,864.00 801,002.73 868,597.58
Sales MU 825.77 906.30 995.48
Revenue from Fixed Charges Rs. Crs. 106.60 161.40 174.57
Revenue from Variable Charges Rs. Crs. 557.19 616.30 676.75
Total Revenue Rs. Crs. 669.70 777.69 851.32
LV 3: PUBLIC WATER WORKS AND STREET LIGHTS
PUBLIC WATER WORKS
Municipal Corporation/ Cantonment Board
Consumers Nos. 3,485 3,649 3,687
MPMKVVCL Annexure-I of ARR/Tariff Petition FY-18
Revenue from Current Tariff & Charges
Form R5
PY CY
FY17 FY18 FY19
MYT 2016-17 to
2018-19Particulars Parameter
Unit of
measure-
ment
Connected Load KW 24,952.00 26,563.49 27,226.93
Sales MU 83.48 97.59 100.01
Revenue from Fixed Charges Rs. Crs. 6.08 7.65 7.84
Revenue from Variable Charges Rs. Crs. 37.77 50.74 52.00
Total Revenue Rs. Crs. 47.09 58.40 59.84
Municipality / Nagar Panchayat
Consumers Nos. 2,497 2,552 2,703
Connected Load KW 18,791.00 19,862.84 21,404.00
Sales MU 75.25 81.41 87.77
Revenue from Fixed Charges Rs. Crs. 4.40 5.48 5.91
Revenue from Variable Charges Rs. Crs. 34.27 40.71 43.88
Total Revenue Rs. Crs. 39.02 46.19 49.79
Gram Panchayat
Consumers Nos. 3,734 3,358 3,552
Connected Load KW 17,567.00 17,443.11 18,772.14
Sales MU 60.59 61.86 66.41
Revenue from Fixed Charges Rs. Crs. 1.84 2.09 2.25
Revenue from Variable Charges Rs. Crs. 27.61 30.31 32.54
Total Revenue Rs. Crs. 31.20 32.40 34.80
Sub-Total General
Consumers Nos. 9,716 9,559 9,943
Connected Load KW 61,310.00 63,869.43 67,403.07
Sales MU 219.32 240.85 254.19
Revenue from Fixed Charges Rs. Crs. 12.32 15.23 16.00
Revenue from Variable Charges Rs. Crs. 99.65 121.76 128.43
Total Revenue Rs. Crs. 117.31 136.99 144.43
Temporary
MPMKVVCL Annexure-I of ARR/Tariff Petition FY-18
Revenue from Current Tariff & Charges
Form R5
PY CY
FY17 FY18 FY19
MYT 2016-17 to
2018-19Particulars Parameter
Unit of
measure-
ment
Consumers Nos. 273 227 227
Connected Load KW 1,794.00 1,564.50 1,564.50
Sales MU 3.34 4.02 4.02
Revenue from Fixed Charges Rs. Crs. 0.25 0.48 0.48
Revenue from Variable Charges Rs. Crs. 1.94 2.65 2.64
Total Revenue Rs. Crs. 2.24 3.13 3.13
Sub-Total Public Water Works
Consumers Nos. 9,989 9,786 10,170
Connected Load KW 63,104.00 65,433.93 68,967.56
Sales MU 222.66 244.88 258.21
Revenue from Fixed Charges Rs. Crs. 12.56 15.71 16.48
Revenue from Variable Charges Rs. Crs. 101.59 124.41 131.07
Total Revenue Rs. Crs. 119.56 140.12 147.56
STREET LIGHTS (incl. Traffic Signals)
Municipal Corporation/ Cantonment Board
Consumers Nos. 1,303 1,377 1,454
Connected Load KW 13,372.00 14,321.40 15,134.59
Sales MU 46.65 52.44 55.42
Revenue from Fixed Charges Rs. Crs. 4.79 6.01 6.36
Revenue from Variable Charges Rs. Crs. 21.88 27.27 28.82
Total Revenue Rs. Crs. 27.21 33.29 35.18
Municipality / Nagar Panchayat
Consumers Nos. 777 802 828
Connected Load KW 12,093.00 14,005.69 14,462.53
Sales MU 50.20 58.21 60.10
Revenue from Fixed Charges Rs. Crs. 4.24 5.38 5.55
Revenue from Variable Charges Rs. Crs. 23.08 29.11 30.05
MPMKVVCL Annexure-I of ARR/Tariff Petition FY-18
Revenue from Current Tariff & Charges
Form R5
PY CY
FY17 FY18 FY19
MYT 2016-17 to
2018-19Particulars Parameter
Unit of
measure-
ment
Total Revenue Rs. Crs. 27.17 34.48 35.61
Gram Panchayat
Consumers Nos. 680 699 716
Connected Load KW 1,954.00 2,425.41 2,789.27
Sales MU 6.38 8.14 9.35
Revenue from Fixed Charges Rs. Crs. 0.18 0.29 0.33
Revenue from Variable Charges Rs. Crs. 2.96 3.99 4.58
Total Revenue Rs. Crs. 3.15 4.28 4.92
Sub-Total Street Lights
Consumers Nos. 2,760 2,878 2,999
Connected Load KW 27,419.00 30,752.50 32,386.39
Sales MU 103.23 118.79 124.88
Revenue from Fixed Charges Rs. Crs. 9.20 11.68 12.24
Revenue from Variable Charges Rs. Crs. 47.92 60.36 63.45
Total Revenue Rs. Crs. 57.54 72.05 75.70
Total - LV 3 PWW and Street Lights
Consumers Nos. 12,749 12,664 13,169
Connected Load KW 90,523.00 96,186.43 101,353.95
Sales MU 325.89 363.67 383.09
Revenue from Fixed Charges Rs. Crs. 21.77 27.39 28.73
Revenue from Variable Charges Rs. Crs. 149.51 184.77 194.53
Total Revenue Rs. Crs. 177.09 212.17 223.26
LV 4: LT INDUSTRY
Upto 25 HP
Consumers Nos. 26,986 27,503 28,019
Connected Load KW 127,799.10 115,970.74 120,973.68
MPMKVVCL Annexure-I of ARR/Tariff Petition FY-18
Revenue from Current Tariff & Charges
Form R5
PY CY
FY17 FY18 FY19
MYT 2016-17 to
2018-19Particulars Parameter
Unit of
measure-
ment
Sales MU 73.27 75.12 81.00
Revenue from Fixed Charges Rs. Crs. 24.68 24.58 25.54
Revenue from Variable Charges Rs. Crs. 34.75 33.13 35.72
Total Revenue Rs. Crs. 63.44 57.71 61.26
Demand Based - CD and CL Up to 100HP
Consumers Nos. 5,455 5,556 5,647
Connected Load KW 171,514.90 196,132.53 204,283.75
Sales MU 177.10 206.68 222.96
Revenue from Fixed Charges Rs. Crs. 36.16 60.36 62.64
Revenue from Variable Charges Rs. Crs. 101.16 130.21 140.47
Total Revenue Rs. Crs. 144.29 190.58 203.11
Demand Based - CD 100HP and CL Up to 150HP
Consumers Nos. 10 0 0
Connected Load KW 178.20 0.00 0.00
Sales MU 0.16 0.00 0.00
Revenue from Fixed Charges Rs. Crs. 0.03 0.00 0.00
Revenue from Variable Charges Rs. Crs. 0.07 0.00 0.00
Total Revenue Rs. Crs. 0.11 0.00 0.00
Demand Based - CD 101HP to 150 HP and CL Up to 150HP
Consumers Nos. 18 26 26
Connected Load KW 979.80 1,030.13 1,090.79
Sales MU 1.55 2.12 2.39
Revenue from Fixed Charges Rs. Crs. 0.32 0.35 0.37
Revenue from Variable Charges Rs. Crs. 0.95 1.34 1.50
Total Revenue Rs. Crs. 1.35 1.69 1.88
Sub-Total General
Consumers Nos. 32,469 33,085 33,691
MPMKVVCL Annexure-I of ARR/Tariff Petition FY-18
Revenue from Current Tariff & Charges
Form R5
PY CY
FY17 FY18 FY19
MYT 2016-17 to
2018-19Particulars Parameter
Unit of
measure-
ment
Connected Load KW 300,472.00 313,133.40 326,348.22
Sales MU 252.08 283.93 306.35
Revenue from Fixed Charges Rs. Crs. 61.19 85.29 88.55
Revenue from Variable Charges Rs. Crs. 136.94 164.68 177.69
Total Revenue Rs. Crs. 209.20 249.97 266.24
Temporary
Consumers Nos. 48 57 57
Connected Load KW 562.00 914.07 914.07
Sales MU 0.81 1.29 1.29
Revenue from Fixed Charges Rs. Crs. 0.15 0.27 0.27
Revenue from Variable Charges Rs. Crs. 0.65 0.97 0.97
Total Revenue Rs. Crs. 0.83 1.24 1.24
Total LV 4 LT Industrial
Consumers Nos. 32,517 33,142 33,748
Connected Load KW 301,034.00 314,047.47 327,262.29
Sales MU 252.88 285.22 307.77
Revenue from Fixed Charges Rs. Crs. 61.34 85.57 88.82
Revenue from Variable Charges Rs. Crs. 137.59 165.65 178.66
Total Revenue Rs. Crs. 210.03 251.21 267.48
LV 5.1: IRRIGATION PUMP FOR AGRICULTURE
Metered
Permanent Connections - For agriculture Use
first 300 units
Consumers Nos. 1,852 1,903 1,903
MPMKVVCL Annexure-I of ARR/Tariff Petition FY-18
Revenue from Current Tariff & Charges
Form R5
PY CY
FY17 FY18 FY19
MYT 2016-17 to
2018-19Particulars Parameter
Unit of
measure-
ment
Connected Load KW 8,488.00 11,728.69 11,728.69
Sales MU 10.45 20.56 20.56
Revenue from Fixed Charges 0.25 0.66 0.66
Revenue from Variable Charges 4.62 8.84 8.84
Total Revenue Rs. Crs. 4.99 9.50 9.50
Above 300 to 750 units
Consumers Nos. 1,852 1,903 1,903
Connected Load KW 8,488.00 11,728.69 11,728.69
Sales MU 15.03 29.56 30.48
Revenue from Fixed Charges 0.32 0.85 0.85
Revenue from Variable Charges 7.96 15.23 15.70
Total Revenue Rs. Crs. 8.48 16.07 16.55
Above 750 Units
Consumers Nos. 1,852 1,903 1,903
Connected Load KW 8,488.00 11,728.69 11,728.69
Sales MU 11.59 22.80 30.37
Revenue from Fixed Charges 0.32 0.85 0.85
Revenue from Variable Charges 6.50 12.43 16.55
Total Revenue Rs. Crs. 6.98 13.28 17.40
Temporary
Connections
Consumers Nos. 560 379 256
Connected Load KW 2,253.00 1,524.15 1,031.09
Sales MU 3.31 3.04 2.06
MPMKVVCL Annexure-I of ARR/Tariff Petition FY-18
Revenue from Current Tariff & Charges
Form R5
PY CY
FY17 FY18 FY19
MYT 2016-17 to
2018-19Particulars Parameter
Unit of
measure-
ment
Revenue from Fixed Charges Rs. Crs. 0.06 0.11 0.07
Revenue from Variable Charges Rs. Crs. 1.71 1.70 1.15
Total Revenue Rs. Crs. 1.73 1.81 1.23
Sub-Total Metered
connections
Consumers Nos. 6,117 6,089 5,966
Connected Load KW 27,717.00 36,710.23 36,217.17
Sales MU 40.38 75.97 83.47
Revenue from Fixed Charges 0.94 2.47 2.43
Revenue from Variable Charges 20.78 38.19 42.24
Total Revenue Rs. Crs. 22.18 40.66 44.68
un- metered consumers
Permanent Connections - For agriculture Use
first 300 units
Consumers Nos. 155,034 173,642 187,865
Connected Load KW 680,640.67 758,528.47 820,733.25
Sales MU 1,645.96 1,857.85 2,028.95
Revenue from Fixed Charges 31.73 42.71 46.21
Revenue from Variable Charges 737.50 798.88 872.45
Total Revenue Rs. Crs. 828.91 841.58 918.65
MPMKVVCL Annexure-I of ARR/Tariff Petition FY-18
Revenue from Current Tariff & Charges
Form R5
PY CY
FY17 FY18 FY19
MYT 2016-17 to
2018-19Particulars Parameter
Unit of
measure-
ment
Above 300 to 750 units
Consumers Nos. 155,034 173,642 187,865
Connected Load KW 680,640.67 758,528.47 820,733.25
Sales MU 1,644.50 1,856.20 2,434.84
Revenue from Fixed Charges 31.73 54.91 59.41
Revenue from Variable Charges 736.84 955.94 1,253.94
Total Revenue Rs. Crs. 828.20 1,010.85 1,313.35
Above 750 Units
Consumers Nos. 155,034 173,642 187,865
Connected Load KW 680,640.67 758,528.47 820,733.25
Sales MU 768.17 867.06 1,086.65
Revenue from Fixed Charges 31.73 54.91 59.41
Revenue from Variable Charges 344.19 472.55 592.22
Total Revenue Rs. Crs. 405.09 527.45 651.63
Temporary Connections
Consumers Nos. 34,844 23,572 15,946
Connected Load KW 101,868.00 68,913.70 46,620.12
Sales MU 246.96 157.89 106.81
Revenue from Fixed Charges Rs. Crs. 3.72 4.99 3.37
Revenue from Variable Charges Rs. Crs. 129.47 88.26 59.71
Total Revenue Rs. Crs. 136.38 93.25 63.08
MPMKVVCL Annexure-I of ARR/Tariff Petition FY-18
Revenue from Current Tariff & Charges
Form R5
PY CY
FY17 FY18 FY19
MYT 2016-17 to
2018-19Particulars Parameter
Unit of
measure-
ment
Sub-Total Un-Metered connections
Consumers Nos. 499,945 544,498 579,543
Connected Load KW 2,143,790.00 2,344,499.12 2,508,819.86
Sales MU 4,305.59 4,738.99 5,657.24
Revenue from Fixed Charges Rs. Crs. 98.91 157.51 168.40
Revenue from Variable Charges Rs. Crs. 1,948.01 2,315.62 2,778.32
Total Revenue Rs. Crs. 2,198.58 2,473.13 2,946.72
DTR metered group consumers
Permanent Connections
Consumers Nos. 0 0 0
Connected Load KW 0.00 0.00 0.00
Sales MU 0.00 0.00 0.00
Revenue from Fixed Charges 0.00 0.00 0.00
Revenue from Variable Charges 0.00 0.00 0.00
Total Revenue Rs. Crs. 0.00 0.00 0.00
Total LV 5.1
Consumers Nos. 506,062 550,587 585,509
Connected Load KW 2,171,507.00 2,381,209.36 2,545,037.03
Sales MU 4,345.97 4,814.96 5,740.72
Revenue from Fixed Charges Rs. Crs. 99.85 159.98 170.83
Revenue from Variable Charges Rs. Crs. 1,968.78 2,353.82 2,820.56
Total Revenue Rs. Crs. 2,220.75 2,513.79 2,991.40
LV 5.2: Other than agriculture use - Horticulture
first 300 units
MPMKVVCL Annexure-I of ARR/Tariff Petition FY-18
Revenue from Current Tariff & Charges
Form R5
PY CY
FY17 FY18 FY19
MYT 2016-17 to
2018-19Particulars Parameter
Unit of
measure-
ment
Consumers Nos. 0 0 0
Connected Load KW 0.00 0.00 0.00
Sales MU 0.00 0.00 0.00
Revenue from Fixed Charges Rs. Crs. 0.00 0.00 0.00
Revenue from Variable Charges Rs. Crs. 0.00 0.00 0.00
Total Revenue Rs. Crs. 0.00 0.00 0.00
Above 300 to 750 units
Consumers Nos. 0 0 0
Connected Load KW 0.00 0.00 0.00
Sales MU 0.00 0.00 0.00
Revenue from Fixed Charges Rs. Crs. 0.00 0.00 0.00
Revenue from Variable Charges Rs. Crs. 0.00 0.00 0.00
Total Revenue Rs. Crs. 0.00 0.00 0.00
Above 750 Units
Consumers Nos. 0 0 0
Connected Load KW 0.00 0.00 0.00
Sales MU 0.00 0.00 0.00
Revenue from Fixed Charges Rs. Crs. 0.00 0.00 0.00
Revenue from Variable Charges Rs. Crs. 0.00 0.00 0.00
Total Revenue Rs. Crs. 0.00 0.00 0.00
Temporary Connections
Consumers Nos. 0 0 0
Connected Load KW 0.00 0.00 0.00
MPMKVVCL Annexure-I of ARR/Tariff Petition FY-18
Revenue from Current Tariff & Charges
Form R5
PY CY
FY17 FY18 FY19
MYT 2016-17 to
2018-19Particulars Parameter
Unit of
measure-
ment
Sales MU 0.00 0.00 0.00
Revenue from Fixed Charges Rs. Crs. 0.00 0.00 0.00
Revenue from Variable Charges Rs. Crs. 0.00 0.00 0.00
Total Revenue Rs. Crs. 0.00 0.00 0.00
Sub-Total
Consumers Nos. 0 0 0
Connected Load KW 0.00 0.00 0.00
Sales MU 0.00 0.00 0.00
Revenue from Fixed Charges Rs. Crs. 0.00 0.00 0.00
Revenue from Variable Charges Rs. Crs. 0.00 0.00 0.00
Total Revenue Rs. Crs. 0.00 0.00 0.00
5.3 For other than agriculture use
Upto 25 HP - Total
Area
Consumers Nos. 427 459 482
Connected Load KW 1,977.00 2,097.30 2,209.28
Sales MU 2.81 3.72 3.90
Revenue from Fixed Charges Rs. Crs. 0.20 0.26 0.27
Revenue from Variable Charges Rs. Crs. 1.28 1.78 1.87
Total Revenue Rs. Crs. 1.54 2.04 2.14
Demand base Tariff Upto 100HP- Total Area
Consumers Nos. 21 21 21
Connected Load KW 688.00 688.00 688.00
Sales MU 1.03 0.75 0.75
Revenue from Fixed Charges Rs. Crs. 0.00 0.11 0.11
MPMKVVCL Annexure-I of ARR/Tariff Petition FY-18
Revenue from Current Tariff & Charges
Form R5
PY CY
FY17 FY18 FY19
MYT 2016-17 to
2018-19Particulars Parameter
Unit of
measure-
ment
Revenue from Variable Charges Rs. Crs. 0.60 0.43 0.43
Total Revenue Rs. Crs. 0.59 0.54 0.54
Temporary Connections Total Area
Consumers Nos. 27 27 27
Connected Load KW 136.00 97.50 97.50
Sales MU 0.20 0.19 0.19
Revenue from Fixed Charges Rs. Crs. 0.01 0.02 0.02
Revenue from Variable Charges Rs. Crs. 0.09 0.14 0.14
Total Revenue Rs. Crs. 0.12 0.16 0.16
Sub-Total
Consumers Nos. 475 507 530
Connected Load KW 2,801.00 2,882.80 2,994.78
Sales MU 4.04 4.65 4.84
Revenue from Fixed Charges Rs. Crs. 0.21 0.39 0.41
Revenue from Variable Charges Rs. Crs. 1.98 2.35 2.44
Total Revenue Rs. Crs. 2.25 2.74 2.85
TOTAL LV 5 AGRICULTURE
Consumers Nos. 506,537 551,095 586,039
Connected Load KW 2,174,308.00 2,384,092.16 2,548,031.81
Sales MU 4,350.02 4,819.62 5,745.56
Revenue from Fixed Charges Rs. Crs. 100.06 160.37 171.24
Revenue from Variable Charges Rs. Crs. 1,970.76 2,356.17 2,823.01
Total Revenue Rs. Crs. 2,223.01 2,516.54 2,994.25
TOTAL LOW TENSION
Consumers Nos. 3,314,643 4,026,424 5,485,674
Connected Load KW 5,888,843.00 6,454,800.97 7,073,291.35
MPMKVVCL Annexure-I of ARR/Tariff Petition FY-18
Revenue from Current Tariff & Charges
Form R5
PY CY
FY17 FY18 FY19
MYT 2016-17 to
2018-19Particulars Parameter
Unit of
measure-
ment
Sales MU 9,257.95 10,153.73 12,171.39
Revenue from Fixed Charges Rs. Crs. 697.82 958.71 1,081.10
Revenue from Variable Charges Rs. Crs. 4,432.97 5,200.04 6,169.52
Total Revenue Rs. Crs. 5,316.48 6,158.75 7,250.62
HIGH TENSION
HV 1: RAILWAY TRACTION
Consumers Nos. 0 0 1
Connected Load KW 0.00 0.00 9,500.00
Sales MU 0.00 0.00 24.97
Revenue from Fixed Charges Rs. Crs. 0.00 0.00 3.35
Revenue from Variable Charges Rs. Crs. 0.00 0.00 14.73
Total Revenue Rs. Crs. 0.00 0.00 10.88
HV 2: COAL MINES
220 kV
Consumers Nos. 0 0 0
Connected Load KW 0.00 0.00 0.00
Sales MU 0.00 0.00 0.00
Revenue from Fixed Charges 0.00 0.00 0.00
Revenue from Variable Charges 0.00 0.00 0.00
Total Revenue Rs. Crs. 0.00 0.00 0.00
132 kV
Consumers Nos. 0 0 0
Connected Load KW 0.00 0.00 0.00
Sales MU 0.00 0.00 0.00
Revenue from Fixed Charges 0.00 0.00 0.00
MPMKVVCL Annexure-I of ARR/Tariff Petition FY-18
Revenue from Current Tariff & Charges
Form R5
PY CY
FY17 FY18 FY19
MYT 2016-17 to
2018-19Particulars Parameter
Unit of
measure-
ment
Revenue from Variable Charges 0.00 0.00 0.00
Total Revenue Rs. Crs. 0.00 0.00 0.00
33 kV
Consumers Nos. 4 4 4
Connected Load KW 10,980.00 10,980.00 10,980.00
Sales MU 30.40 30.40 30.40
Revenue from Fixed Charges 8.06 9.22 9.22
Revenue from Variable Charges 17.71 19.76 19.76
Total Revenue Rs. Crs. 25.77 19.39 19.39
11 kV
Consumers Nos. 1 1 1
Connected Load KW 162.00 162.00 162.00
Sales MU 0.54 0.54 0.54
Revenue from Fixed Charges 0.04 0.13 0.13
Revenue from Variable Charges 0.28 0.36 0.36
Total Revenue Rs. Crs. 0.32 0.49 0.49
TOTAL HV 2 COAL MINES
Consumers Nos. 5 5 5
Connected Load KW 11,142.00 11,142.00 11,142.00
Sales MU 30.95 30.95 30.95
Revenue from Fixed Charges Rs. Crs. 8.10 9.36 9.36
Revenue from Variable Charges Rs. Crs. 17.99 20.13 20.13
Total Revenue Rs. Crs. 26.09 19.87 19.87
HV-3: INDUSTRIAL AND NON-INDUSTRIAL
HV 3.1: Industrial Use
MPMKVVCL Annexure-I of ARR/Tariff Petition FY-18
Revenue from Current Tariff & Charges
Form R5
PY CY
FY17 FY18 FY19
MYT 2016-17 to
2018-19Particulars Parameter
Unit of
measure-
ment
11kV supply
Consumers Nos. 294 307 320
Connected Load KW 28,598.00 29,497.48 30,472.47
Sales MU 52.65 55.91 59.42
Revenue from Fixed Charges Rs. Crs. 11.34 12.98 13.41
Revenue from Variable Charges Rs. Crs. 33.04 36.90 39.22
Total Revenue Rs. Crs. 44.38 49.94 52.69
33kV supply
Consumers Nos. 777 834 896
Connected Load KW 303,721.00 320,683.49 337,138.31
Sales MU 1,023.55 1,124.60 1,236.33
Revenue from Fixed Charges Rs. Crs. 161.75 218.06 229.25
Revenue from Variable Charges Rs. Crs. 513.01 730.99 803.61
Total Revenue Rs. Crs. 688.39 939.38 1,022.23
132kV supply
Consumers Nos. 20 20 21
Connected Load KW 173,840.00 184,395.90 184,396.90
Sales MU 990.85 1,053.92 1,121.10
Revenue from Fixed Charges Rs. Crs. 123.92 149.98 149.98
Revenue from Variable Charges Rs. Crs. 465.96 617.92 653.19
Total Revenue Rs. Crs. 589.88 577.82 600.98
200kV supply
Consumers Nos. 0 0 0
Connected Load KW 0.00 0.00 0.00
Sales MU 0.00 0.00 0.00
Revenue from Fixed Charges Rs. Crs. 0.00 0.00 0.00
MPMKVVCL Annexure-I of ARR/Tariff Petition FY-18
Revenue from Current Tariff & Charges
Form R5
PY CY
FY17 FY18 FY19
MYT 2016-17 to
2018-19Particulars Parameter
Unit of
measure-
ment
Revenue from Variable Charges Rs. Crs. 0.00 0.00 0.00
Total Revenue Rs. Crs. 0.00 0.00 0.00
400kV supply
Consumers Nos. 0 0 0
Connected Load KW 0.00 0.00 0.00
Sales MU 0.00 0.00 0.00
Revenue from Fixed Charges Rs. Crs. 0.00 0.00 0.00
Revenue from Variable Charges Rs. Crs. 0.00 0.00 0.00
Total Revenue Rs. Crs. 0.00 0.00 0.00
Sub-Total HV 3.1: Industrial Use
Consumers Nos. 1,091 1,161 1,237
Connected Load KW 506,159.00 534,576.87 552,007.68
Sales MU 2,067.05 2,234.43 2,416.85
Revenue from Fixed Charges Rs. Crs. 297.01 381.02 392.64
Revenue from Variable Charges Rs. Crs. 1,012.02 1,385.81 1,496.02
Total Revenue Rs. Crs. 1,322.66 1,567.14 1,675.89
HV 3.2: Non-industrial use
11kV supply
Consumers Nos. 399 417 434
Connected Load KW 47,597.00 47,773.00 49,339.59
Sales MU 113.62 118.89 124.97
Revenue from Fixed Charges Rs. Crs. 18.27 19.11 19.74
Revenue from Variable Charges Rs. Crs. 75.18 80.84 84.98
Total Revenue Rs. Crs. 93.47 99.58 104.32
33kV supply
Consumers Nos. 399 404 414
MPMKVVCL Annexure-I of ARR/Tariff Petition FY-18
Revenue from Current Tariff & Charges
Form R5
PY CY
FY17 FY18 FY19
MYT 2016-17 to
2018-19Particulars Parameter
Unit of
measure-
ment
Connected Load KW 98,476.00 99,261.00 104,287.55
Sales MU 256.79 269.26 280.59
Revenue from Fixed Charges Rs. Crs. 44.40 56.91 59.79
Revenue from Variable Charges Rs. Crs. 134.97 180.40 188.00
Total Revenue Rs. Crs. 182.69 236.23 246.66
132kV supply
Consumers Nos. 2 2 2
Connected Load KW 2,925.00 2,925.00 2,925.00
Sales MU 7.19 7.59 7.80
Revenue from Fixed Charges Rs. Crs. 1.26 2.11 2.11
Revenue from Variable Charges Rs. Crs. 4.79 4.70 4.84
Total Revenue Rs. Crs. 6.05 6.81 6.94
220kV supply
Consumers Nos. 0 0 0
Connected Load KW 0.00 0.00 0.00
Sales MU 0.00 0.00 0.00
Revenue from Fixed Charges Rs. Crs. 0.00 0.00 0.00
Revenue from Variable Charges Rs. Crs. 0.00 0.00 0.00
Total Revenue Rs. Crs. 0.00 0.00 0.00
Sub-Total HV 3.2: Non-Industrial Use
Consumers Nos. 800 823 850
Connected Load KW 148,998.00 149,959.00 156,552.13
Sales MU 377.60 395.73 413.36
Revenue from Fixed Charges Rs. Crs. 63.93 78.12 81.63
Revenue from Variable Charges Rs. Crs. 214.94 265.95 277.81
Total Revenue Rs. Crs. 282.21 342.61 357.92
MPMKVVCL Annexure-I of ARR/Tariff Petition FY-18
Revenue from Current Tariff & Charges
Form R5
PY CY
FY17 FY18 FY19
MYT 2016-17 to
2018-19Particulars Parameter
Unit of
measure-
ment
HV 3.3: Shopping Mall
11kV supply
Consumers Nos. 6 5 5
Connected Load KW 920.00 745.00 769.43
Sales MU 1.24 1.80 1.89
Revenue from Fixed Charges Rs. Crs. 0.22 0.27 0.28
Revenue from Variable Charges Rs. Crs. 0.83 1.22 1.29
Total Revenue Rs. Crs. 1.02 1.45 1.52
33kV supply
Consumers Nos. 9 9 9
Connected Load KW 12,050.00 12,150.00 12,765.27
Sales MU 26.01 26.07 27.16
Revenue from Fixed Charges Rs. Crs. 9.19 6.08 6.38
Revenue from Variable Charges Rs. Crs. 37.95 17.20 17.93
Total Revenue Rs. Crs. 43.82 19.95 20.85
132kV supply
Consumers Nos. 0 0 0
Connected Load KW 0.00 0.00 0.00
Sales MU 0.00 0.00 0.00
Revenue from Fixed Charges Rs. Crs. 0.00 0.00 0.00
Revenue from Variable Charges Rs. Crs. 0.00 0.00 0.00
Total Revenue Rs. Crs. 0.00 0.00 0.00
Sub-Total HV 3.3: Shopping mall
Consumers Nos. 15 14 15
Connected Load KW 12,970.00 12,895.00 13,534.70
Sales MU 27.25 27.87 29.06
MPMKVVCL Annexure-I of ARR/Tariff Petition FY-18
Revenue from Current Tariff & Charges
Form R5
PY CY
FY17 FY18 FY19
MYT 2016-17 to
2018-19Particulars Parameter
Unit of
measure-
ment
Revenue from Fixed Charges Rs. Crs. 9.41 6.34 6.66
Revenue from Variable Charges Rs. Crs. 38.78 18.43 19.22
Total Revenue Rs. Crs. 44.84 21.41 22.37
HV 3.4: Power Intensive
33kV supply
Consumers Nos. 11 11 12
Connected Load KW 49,100.00 50,238.53 52,816.36
Sales MU 195.01 212.65 233.77
Revenue from Fixed Charges Rs. Crs. 35.19 35.50 37.32
Revenue from Variable Charges Rs. Crs. 113.46 106.32 116.89
Total Revenue Rs. Crs. 135.02 126.96 137.87
132kV supply
Consumers Nos. 0 0 0
Connected Load KW 0.00 0.00 0.00
Sales MU 0.00 0.00 0.00
Revenue from Fixed Charges Rs. Crs. 0.00 0.00 0.00
Revenue from Variable Charges Rs. Crs. 0.00 0.00 0.00
Total Revenue Rs. Crs. 0.00 0.00 0.00
Sub-Total HV 3.4: Power Intensive
Consumers Nos. 11 11 12
Connected Load KW 49,100.00 50,238.53 52,816.36
Sales MU 195.01 212.65 233.77
Revenue from Fixed Charges Rs. Crs. 35.19 35.50 37.32
Revenue from Variable Charges Rs. Crs. 113.46 106.32 116.89
Total Revenue Rs. Crs. 135.02 126.96 137.87
TOTAL HV 3 INDUSTRIAL AND NON-INDUSTRIAL
MPMKVVCL Annexure-I of ARR/Tariff Petition FY-18
Revenue from Current Tariff & Charges
Form R5
PY CY
FY17 FY18 FY19
MYT 2016-17 to
2018-19Particulars Parameter
Unit of
measure-
ment
Consumers Nos. 1,917 2,010 2,114
Connected Load KW 717,227.00 747,669.40 774,910.87
Sales MU 2,666.91 2,870.68 3,093.03
Revenue from Fixed Charges Rs. Crs. 405.54 500.99 518.25
Revenue from Variable Charges Rs. Crs. 1,379.19 1,776.51 1,909.93
Total Revenue Rs. Crs. 1,784.73 2,058.12 2,194.05
HV-4: SEASONAL
33kV supply
Consumers Nos. 5 6 6
Connected Load KW 801.00 891.00 891.00
Sales MU 1.38 1.44 1.50
Revenue from Fixed Charges Rs. Crs. 0.39 0.44 0.44
Revenue from Variable Charges Rs. Crs. 1.03 0.89 0.93
Total Revenue Rs. Crs. 1.41 1.85 1.91
11kV supply
Consumers Nos. 1 2 2
Connected Load KW 99.00 144.00 144.00
Sales MU 0.27 0.23 0.19
Revenue from Fixed Charges Rs. Crs. 0.06 0.07 0.07
Revenue from Variable Charges Rs. Crs. 0.14 0.14 0.12
Total Revenue Rs. Crs. 0.20 0.21 0.18
TOTAL HV 4 SEASONAL
Consumers Nos. 6 8 8
Connected Load KW 900.00 1,035.00 1,035.00
Sales MU 1.65 1.66 1.69
MPMKVVCL Annexure-I of ARR/Tariff Petition FY-18
Revenue from Current Tariff & Charges
Form R5
PY CY
FY17 FY18 FY19
MYT 2016-17 to
2018-19Particulars Parameter
Unit of
measure-
ment
Revenue from Fixed Charges Rs. Crs. 0.44 0.50 0.50
Revenue from Variable Charges Rs. Crs. 1.17 1.03 1.05
Total Revenue Rs. Crs. 1.61 2.05 2.09
HV-5: HT IRRIGATION AND WATER WORKS
Public water works/ Group Irrigation/Lift Irrigation
132 kV
Consumers Nos. 0 0 0
Connected Load KW 0.00 0.00 0.00
Sales MU 59.91 59.91 59.91
Revenue from Fixed Charges Rs. Crs. 2.94 0.00 0.00
Revenue from Variable Charges Rs. Crs. 25.16 29.96 29.96
Total Revenue Rs. Crs. 28.10 29.96 29.96
33 kV
Consumers Nos. 80 98 116
Connected Load KW 31,343.00 35,810.42 39,308.99
Sales MU 109.32 132.52 160.70
Revenue from Fixed Charges Rs. Crs. 8.73 12.89 14.15
Revenue from Variable Charges Rs. Crs. 51.44 70.23 85.17
Total Revenue Rs. Crs. 60.16 89.84 107.46
11 kV
Consumers Nos. 27 28 28
Connected Load KW 3,964.00 3,961.51 4,129.26
Sales MU 13.89 15.87 18.16
Revenue from Fixed Charges Rs. Crs. 1.28 1.32 1.38
Revenue from Variable Charges Rs. Crs. 7.32 8.73 9.99
Total Revenue Rs. Crs. 8.60 10.55 11.94
MPMKVVCL Annexure-I of ARR/Tariff Petition FY-18
Revenue from Current Tariff & Charges
Form R5
PY CY
FY17 FY18 FY19
MYT 2016-17 to
2018-19Particulars Parameter
Unit of
measure-
ment
Sub-Total
Consumers Nos. 107 125 144
Connected Load KW 35,307.00 39,771.92 43,438.25
Sales MU 183.12 208.30 238.77
Revenue from Fixed Charges Rs. Crs. 12.94 14.21 15.53
Revenue from Variable Charges Rs. Crs. 83.92 108.92 125.12
Total Revenue Rs. Crs. 96.86 130.34 149.35
Other agriculture users
132 kV
Consumers Nos. 0 0 0
Connected Load KW 0.00 0.00 0.00
Sales MU 0.00 0.00 0.00
Revenue from Fixed Charges Rs. Crs. 0.00 0.00 0.00
Revenue from Variable Charges Rs. Crs. 0.00 0.00 0.00
Total Revenue Rs. Crs. 0.00 0.00 0.00
33kV supply
Consumers Nos. 20 21 22
Connected Load KW 2,216.00 2,306.00 2,400.91
Sales MU 6.10 6.39 6.69
Revenue from Fixed Charges Rs. Crs. 0.67 0.86 0.90
Revenue from Variable Charges Rs. Crs. 2.83 3.42 3.58
Total Revenue Rs. Crs. 3.50 4.08 4.26
11kV supply
Consumers Nos. 4 4 4
Connected Load KW 365.00 545.00 545.00
Sales MU 1.62 1.92 2.29
MPMKVVCL Annexure-I of ARR/Tariff Petition FY-18
Revenue from Current Tariff & Charges
Form R5
PY CY
FY17 FY18 FY19
MYT 2016-17 to
2018-19Particulars Parameter
Unit of
measure-
ment
Revenue from Fixed Charges Rs. Crs. 0.20 0.19 0.19
Revenue from Variable Charges Rs. Crs. 0.76 1.07 1.27
Total Revenue Rs. Crs. 0.96 1.23 1.43
Sub-Total Other agriculture users
Consumers Nos. 24 25 26
Connected Load KW 2,581.00 2,851.00 2,945.91
Sales MU 7.72 8.31 8.98
Revenue from Fixed Charges Rs. Crs. 0.87 1.05 1.09
Revenue from Variable Charges Rs. Crs. 3.59 4.48 4.85
Total Revenue Rs. Crs. 4.46 5.30 5.69
TOTAL HV 5
Consumers Nos. 131 150 170
Connected Load KW 37,888.00 42,622.92 46,384.16
Sales MU 190.83 216.61 247.75
Revenue from Fixed Charges Rs. Crs. 13.81 15.26 16.61
Revenue from Variable Charges Rs. Crs. 87.51 113.40 129.96
Total Revenue Rs. Crs. 101.32 135.64 155.04
HV 6: BULK RESIDENTIAL USERS
HV 6.1
132 kV
Consumers Nos. 0 0 0
Connected Load KW 0.00 0.00 0.00
Sales MU 0.00 0.00 0.00
Revenue from Fixed Charges Rs. Crs. 0.00 0.00 0.00
Revenue from Variable Charges Rs. Crs. 0.00 0.00 0.00
MPMKVVCL Annexure-I of ARR/Tariff Petition FY-18
Revenue from Current Tariff & Charges
Form R5
PY CY
FY17 FY18 FY19
MYT 2016-17 to
2018-19Particulars Parameter
Unit of
measure-
ment
Total Revenue Rs. Crs. 0.00 0.00 0.00
33 kV
Consumers Nos. 28 30 31
Connected Load KW 30,139.00 31,006.39 31,360.69
Sales MU 146.10 148.67 151.28
Revenue from Fixed Charges Rs. Crs. 10.93 12.82 12.96
Revenue from Variable Charges Rs. Crs. 75.06 83.97 85.40
Total Revenue Rs. Crs. 86.00 94.54 96.07
11 kV
Consumers Nos. 17 17 19
Connected Load KW 1,457.00 1,469.53 1,484.20
Sales MU 14.28 5.93 16.39
Revenue from Fixed Charges Rs. Crs. 0.46 0.57 0.57
Revenue from Variable Charges Rs. Crs. 2.30 3.47 9.05
Total Revenue Rs. Crs. 2.76 4.05 9.64
Sub-Total 6.1
Consumers Nos. 45 47 50
Connected Load KW 31,596.00 32,475.91 32,844.89
Sales MU 160.38 154.60 167.67
Revenue from Fixed Charges Rs. Crs. 11.39 13.38 13.54
Revenue from Variable Charges Rs. Crs. 77.36 87.44 94.44
Total Revenue Rs. Crs. 88.75 98.58 105.71
HV 6.2
132 kV
Consumers Nos. 0 0 0
Connected Load KW 0.00 0.00 0.00
MPMKVVCL Annexure-I of ARR/Tariff Petition FY-18
Revenue from Current Tariff & Charges
Form R5
PY CY
FY17 FY18 FY19
MYT 2016-17 to
2018-19Particulars Parameter
Unit of
measure-
ment
Sales MU 0.00 0.00 0.00
Revenue from Fixed Charges Rs. Crs. 0.00 0.00 0.00
Revenue from Variable Charges Rs. Crs. 0.00 0.00 0.00
Total Revenue Rs. Crs. 0.00 0.00 0.00
33 kV
Consumers Nos. 0 0 0
Connected Load KW 0.00 0.00 0.00
Sales MU 0.00 0.00 0.00
Revenue from Fixed Charges Rs. Crs. 0.00 0.00 0.00
Revenue from Variable Charges Rs. Crs. 0.00 0.00 0.00
Total Revenue Rs. Crs. 0.00 0.00 0.00
11 kV
Consumers Nos. 0 1 0
Connected Load KW 0.00 1.01 0.00
Sales MU 0.00 9.37 0.00
Revenue from Fixed Charges Rs. Crs. 0.00 0.00 0.00
Revenue from Variable Charges Rs. Crs. 5.67 4.87 0.00
Total Revenue Rs. Crs. 5.67 4.87 0.00
Sub-Total 6.2
Consumers Nos. 0 1 0
Connected Load KW 0.00 1.01 0.00
Sales MU 0.00 9.37 0.00
Revenue from Fixed Charges Rs. Crs. 0.00 0.00 0.00
Revenue from Variable Charges Rs. Crs. 5.67 4.87 0.00
Total Revenue Rs. Crs. 5.67 4.87 0.00
TOTAL HV 6
MPMKVVCL Annexure-I of ARR/Tariff Petition FY-18
Revenue from Current Tariff & Charges
Form R5
PY CY
FY17 FY18 FY19
MYT 2016-17 to
2018-19Particulars Parameter
Unit of
measure-
ment
Consumers Nos. 45 48 50
Connected Load KW 31,596.00 32,476.92 32,844.89
Sales MU 160.38 163.97 167.67
Revenue from Fixed Charges Rs. Crs. 11.39 13.38 13.54
Revenue from Variable Charges Rs. Crs. 83.03 92.31 94.44
Total Revenue Rs. Crs. 94.42 103.45 105.71
HV 7: BULK SUPPLY TO EXEMPTEES
132 kV startup power
Consumers Nos. 1 1 1
Connected Load KW 113.00 113.00 113.00
Sales MU 0.34 0.35 0.37
Revenue from Fixed Charges Rs. Crs. 0.00 0.00 0.00
Revenue from Variable Charges Rs. Crs. 0.00 0.31 0.33
Total Revenue Rs. Crs. 0.00 0.31 0.33
33 kV startup power
Consumers Nos. 1 3 3
Connected Load KW 90.00 270.00 283.50
Sales MU 0.13 0.18 0.19
Revenue from Fixed Charges Rs. Crs. 0.03 0.00 0.00
Revenue from Variable Charges Rs. Crs. 0.08 0.15 0.16
Total Revenue Rs. Crs. 0.11 0.15 0.16
11 kV startup power
Consumers Nos. 0 0 0
Connected Load KW 0.00 0.00 0.00
Sales MU 0.00 0.00 0.00
MPMKVVCL Annexure-I of ARR/Tariff Petition FY-18
Revenue from Current Tariff & Charges
Form R5
PY CY
FY17 FY18 FY19
MYT 2016-17 to
2018-19Particulars Parameter
Unit of
measure-
ment
Revenue from Fixed Charges Rs. Crs. 0.04 0.00 0.00
Revenue from Variable Charges Rs. Crs. 0.19 0.00 0.00
Total Revenue Rs. Crs. 0.23 0.00 0.00
TOTAL HV 7
Consumers Nos. 2 4 4
Connected Load KW 203.00 383.00 396.50
Sales MU 0.47 0.53 0.56
Revenue from Fixed Charges Rs. Crs. 0.07 0.00 0.00
Revenue from Variable Charges Rs. Crs. 0.26 0.47 0.49
Total Revenue Rs. Crs. 0.33 0.47 0.49
TOTAL HT
Consumers Nos. 2,106 2,225 2,352
Connected Load KW 798,956.00 835,329.25 876,213.42
Sales MU 3,051.19 3,284.39 3,566.62
Revenue from Fixed Charges Rs. Crs. 439.37 539.50 561.61
Revenue from Variable Charges Rs. Crs. 1,569.15 2,003.85 2,170.73
Total Revenue Rs. Crs. 2,008.51 2,319.61 2,488.12
GRAND TOTAL HT + LT
Consumers Nos. 3,316,749 4,028,649 5,486,339
Connected Load KW 6,687,799.00 7,290,130.22 7,948,261.77
Sales MU 12,309.14 13,438.12 15,735.40
Revenue from Fixed Charges Rs. Crs. 1,137.18 1,498.21 1,642.71
Revenue from Variable Charges Rs. Crs. 6,002.12 7,203.89 8,340.25
Total Revenue Rs. Crs. 7,324.99 8,478.36 9,738.74
MPMKVVCL Annexure-I of ARR/Tariff Petition FY-18
Name of Distribution Licensee : MPMKVVCL BHOPAL
Summary of revenues and gap/surplus across major categories Form No: R6
With
subsidy
Without
subsidy
A B C D C-D A B C B-C A B C B-C
LT SUPPLY - 400/230 V
(LV1) Domestic 2,036.65 5.81 8.65 (2.84) 2,401.14 6.35 6.40 (0.05) 2,914.32 6.15 6.42 (0.27)
(LV2) Non Domestic 669.70 8.11 8.65 (0.54) 777.69 8.58 6.40 2.18 851.32 8.55 6.42 2.14
(LV3)Public water works and street
light177.09 5.43 8.65 (3.22) 212.17 5.83 6.40 (0.57) 223.26 5.83 6.42 (0.59)
(LV4) Industrial 210.03 8.31 8.65 (0.35) 251.21 8.81 6.40 2.40 267.48 8.69 6.42 2.27
(LV5)
Irrgation Pumps for Agriculture
and agriculture related use in
rural areas
2,223.01 5.11 8.65 (3.54) 2,516.54 5.22 6.40 (1.18) 2,994.25 5.21 6.42 (1.21)
TOTAL LT 5,316.48 5.74 8.65 (2.91) 6,158.75 6.07 6.40 (0.34) 7,250.62 5.96 6.42 (0.46)
HT SUPPLY - 11KV & above
HV-1 Railway Traction - - 8.65 (8.65) - - 6.40 (6.40) 10.88 4.36 6.42 (2.06)
HV-2 Coal Mines 26.09 8.43 8.65 (0.22) 19.87 6.42 6.40 0.02 19.87 6.42 6.42 0.01
HV-3 Industrial and Non Industrial 1,784.73 6.69 8.65 (1.96) 2,058.12 7.17 6.40 0.77 2,194.05 7.09 6.42 0.68
HV-4 Seasonal 1.61 9.77 8.65 1.11 2.05 12.35 6.40 5.95 2.09 12.40 6.42 5.98
HV-5HT Irrigation and Public Water
Works 101.32 5.31 8.65 (3.34) 135.64 6.26 6.40 (0.14) 155.04 6.26 6.42 (0.16)
HV-6 Bulk Residential users 94.42 5.89 8.65 (2.77) 103.45 6.31 6.40 (0.09) 105.71 6.30 6.42 (0.11)
HV-7 Bulk Supply to Exemptees 0.33 7.16 8.65 (1.49) 0.47 8.75 6.40 2.35 0.49 8.75 6.42 2.33
TOTAL HT 2,008.51 2,319.61 7.06 6.40 0.66 2,488.12 6.98 6.42 0.56
GRAND TOTAL 7,324.99 5.95 8.65 (2.70) 8,478.36 6.31 6.40 (0.09) 9,738.74 6.19 6.42 (0.23)
Average
revenue
realisatio
n
(Rs./unit)
Average
cost to
Serve
(Rs./unit)
(Gap) /
Surplus
(Rs / unit)
Total
Revenue
from sale of
power at
current
tariffs (Rs.
Crs.)
Ta
riff
Cate
gory
Type of installation
FY 17
Old
FY 18
Total Revenue Rs.
Crs.
MYT Period
First Year: FY 19
Average
revenue
realisatio
n
(Rs./unit)
Total
Revenue
from sale of
power at
current
tariffs (Rs.
Crs.)
Average
revenue
realisatio
n
(Rs./unit)
Average
cost to
Serve
(Rs./unit)
(Gap) /
Surplus
(Rs / unit)
(Gap) /
Surplus
(Rs / unit)
Average
cost to
Serve
(Rs./unit)
CY
MPMKVVCL Annexure-I of ARR/Tariff Petition FY-18
MPMKVVCL BHOPAL
Income from Wheeling Charges Form No: R7
Contracted
Capacity
(MW)
Monthly
Wheeling
Charges
Total Charges
(Rs.)
Contracted
Capacity
(MW)
Monthly
Wheeling
Charges
Total Charges
(Rs.)
Contracted
Capacity
(MW)
Monthly
Wheeling
Charges
Total Charges
(Rs.)
1M/s Itarsi oil & Flour Mill Itarsi
point-14.11 11026.43 132317.21 4.11 12129.08 145548.93 4.11 13341.98 160103.82
2M/s Itarsi oil & Flour Mill Itarsi
point-20.69 3371.76 40461.18 0.69 3708.94 44507.30 0.69 4079.84 48958.03
3 M/s Betul Oil & Flour Mill 1.25 28078.81 336945.68 1.25 30886.69 370640.25 1.25 33975.36 407704.28
4M/s Engipress Indust., Disst.,
Morena0.23 12.49 149.84 0.23 13.74 164.82 0.23 15.11 181.30
5 M/s Ruchi Soya Guna 1.80 16754.66 201055.92 1.80 18430.13 221161.51 1.80 20273.14 243277.66
6 M/s Chirayu Healt care 0.23 3682.94 44195.32 0.23 4051.24 48614.85 0.23 4456.36 53476.34
7 M/s Box Corrugator 0.23 623.81 7485.68 0.23 686.19 8234.24 0.23 754.81 9057.67
8M/s Insulaters & Electricls
Ltd.,Mandideep0.68 5741.67 68900.08 0.68 6315.84 75790.09 0.68 6947.42 83369.10
9 M/s Hind Spinners Rajgarh. 0.45 0.00 0.00 0.45 0.00 0.00 0.45 0.00 0.00
10 M/s Oswal Denim Rajgar 1.50 44033.04 528396.46 1.50 48436.34 581236.11 1.50 53279.98 639359.72
Total 11.15 113,325.61 1,359,907.36 11.15 124,658.18 1,495,898.10 11.15 137,123.99 1,645,487.91
1M/s Dawat Foods Ltd. , Mandideep
(M/s Atul Sharma)2.00 0.00 0.00 2.00 8876.72 106520.64 2.00 117172.70 1406072.45
2M/s Jehnuma Palace Syamla Hills
Bhopal207753.7 207753.7 38449.42 461393.09 507532.40 6090388.76
3M/s Jehnuma Palace, Prempura,
Bhopal10143.38 10143.38 6886.50 82637.95 90901.75 1090820.97
3.00 217897.11 217897.11 3.00 54212.64 650551.68 3.00 715606.85 8587282.18
14.15 331222.72 1577804.47 14.15 178870.82 2146449.78 14.15 852730.84 10232770.09
FY 17 FY 18 FY 19
Projections for MYT PeriodCurrent year
Sl.No. Discom or Open Access Consumer
Grand Total(A+B)
B) Solar Energy Generator
1.00 1.001.00
Total(B)