Annexure I: Change in Name of the

Organization

Annexure II: EC LETTER

Dak. Recaived ir)rrc 2Blotlo?..,..!..i...,+.H._,

qrf, Fc{Rqqktur \.d T{ q-,]f,q

Government of tndiat\'Iinistry of [nvironment cQ Furests

(IA Division)

eed Post

n,"?(,e

Paryavaran Bhar.vanCGO Complex. Lodhi Road

Ne.,.,,Delhi- 1iC003E-mail: [email protected]

Telephone: 011: 2436 7016

!-frc )@La{fr

f,r[Arwi

F.To

No. J- 1 101 1 I 53/2008-rA-rr(D ijated : June 1 l, 2008

'frs KzuBHCO Shyam Fertilizers Ltd

\,'illage and Post Piprola.Shahjahanpu.Llttar Pradesh

Ph 0120-254s463Sub : Expansion of Ammonia /urea plant of capacilv at \rillage and Post Piprola,

.Shahjahanpur , Uttar Pradesh by M/.s. KzuBHCO Shyam Fertilizers Ltd. -Enyironmental Clearance reg.

Sir.This has reference to your letter No. Nil dated 22"d December, 2007 along .;vith

Form-1 and oroject report seeking environmental clearance for the above proiect underthe Environment Impact Assessment Notificat ion, 2006.

2. The Ministry of Environment and Forests has examined the application and notedthat proposal is for environmental clearaace for expansion of Ammonia lurea plant ofcapacity at Village and Post Piprola, Shahjahanpur, Uttar Pradesh by VI/s. KRiBHCOShyam Fertilizers Ltd. The existing cost of theproject is Rs. 1950 Crores. The total costof the proposed expansion will be Rs.405 Crores. The details of product and productioncapacity are as given belor.v:

Products Initial production present production After expansionAmmonia 1350 MTPD 18OO MTPD i95ONITPDUrea 22OO MTPD 3000 tr4TPD 3l3OMTPI)

3. Sracks oiadequate height have been provicleci for control of gaseous emissions. Incase of emer,e,lencY the process gas lvill be released to atmosphere throi-rgh flare stack.,Drilling to\,ver having natural draft r.vill be provided to minimize the

"u.iy'or., of urea

clLtst. This chist r,vill be iiirther ciii,.rteci ciue io its release at height of rnore than 102 meters.Low jrlOx burner i.vill be plovided. Natural Gas and low Sulphr-rr Naphtha foi generationof steam rvill be r,rsed. The total industrial r,vater requirement for the plant after proposecle,-,pansion ,*,i11 be 24A00 KL/Da1, and domestic lvater reqriirement rvill be 25C0 I{LDr'vhich'lill be sourced from the gror-rncl ."\,ater. EfflLrent Treatment Plant lvi11 be provicied

.r\ .,\ i.' '--\<-

lrirge Jol'-5

A.

for treatment of trade effluent consisting of Ammonia stripping system, Oily watertreatment system, Contaminated Pond, Balance Pond, Guard Pond, Stabilization Pond,with all necessary on litre analyz.ers.'T6e trcatcrl water r,vill be used fbr irrigation of GreenBelt & other Horticnlture purposes. Sewage Treatment Plant will be installed fortreatment of domestic waste water.

4" All the Chemical Fertilizer plants have been listed at Sl. No. 5(a) under Category'A'and appraised at the Central level in 8l't meeting of Expert Appraisal Cornmittee(Indnstry) held during 12'h - 14'h May. 2008. Public hearing/pubiic ccnsuitation is

$isrense{.with as per paraT(11) of EIA Notification)X;i;6,,.._

5. Based on the information submitted by project authorities, the Ministry ofEnvironment and Forests hereby accords environmental clearance to above project underthe provisions of EiA Notification dated 14thSeptembcr 2006 subiect to the complianceof the fbllor.ving Specific and General conditions:

i)

SPECIFIC CONDITIUNS :

The company shall implement all thc rccommendations made in the C[a1ter o1Corporate Responsibility for Environmental Protcction (CREP) for ferlilizerindustries.

ii) The project authority shali install effluent treatment plant and sewage treatmentplant to treat the waste r,vater and the treated r,vaste water shall be recvcled/reused/used for irri gati on/green belt development.

Permission of Central Ground Water Authority/Central Ground Water Board shallbe obtained for drawl of ground water.

The project authorities shall install efficient air pollution control system to controlparticulate and gaseous emission from the plant.

The gaseous emissions (So2, Nox, NH:, fertilizer dusi) and particulate matterfrom various process units shall conform to the standards prescribed by theconcemed authorities from time to time. Emission data shali be periodicallymonitored and reports submitted to Ministry's Regional Office, CPCB and SpCB.

Spent catalysts shall be sold to authorized venders for its metal value. The othersoiids r,vastes shali be segregated and stored in the separate storage space andfinally sold to the authorized venders.

vii) The company shaii deveiop the green belt in atleast -:3o/o land area to mitigate theeffect of fugitive emissions and noise as per the gr-ridelines CpCB.

viii) Occr-rpational health surveillance of the r.vorkers shall be carriecl cut on a regularbasis and records shall be maintained as per the Factories Act.

iii)

ir)

v)

vi)

0r -\-,r\ \' ,,,r" \ -,. --,\ \-, /x- Page 2 of5

(ii)

B. GE,NERAL CONDITIONS :

(i) The project authoritics shall strictly adhere to the stipulations of the SPCBistategovemment or any statutory body.

(iii)

No fuither expansion or modifications in the plant shall be carried out ,"vithout

prior approval of the Ministry of Environment and Forests. In case of deviationsor alterations in the project proposal from those submitted to this lrirnistry torclearance, a fresh reference shall be made to the Ministry to assess the adequacy

of conditions imposed and to add additional environmental protection measnres

required, if any.

At no time, the emissions shall exceed the prescribed limits. In the event offailure of any pollution control system adopted by the unit, the unit shall be

immediately put out of operation and shall not be restarted until the desiredcfficicncy has been achieved.

W --,fne locaf ions ,rf ambient air quality monitorin,q stations shall be revierved inconsultation with the State Pollution Control Board (SPCB) and additionalstations shall be installed, if required, in the downlvind dircction as well as wheremaximurn ground level concenl"rations are anticipated.

Dedicated scrubbers and stacks of appropriate height as per the Central PolluticnControl Board guidelines shall be provided to control the emissicns flcm .rarious

vents. The scrubbed water shall be sent to ETP for ftirther treatmeirt.

("i) All the storage tanks r,vill be under negative pressure to avoid any leakages.

Breathel valves, Nz blanketing and secondary condensers with brine chillingsystem shall be provided tbr all the storage tanks to minimize vapour losses. Allliquid ralv material shall be stored in storage Tanks and Drums.

(vii) The companrT shall undertake following Waste Minimization measures.

stibstitutes in other processes.

generation.

(viii) Fugitive emissions in the r,vork zone environment, product, and raw materialsstorage area shali be regularllr monitored. The emissions shall conform to thelimits imposed by the State Pollution Control Boards/Central Pollution ControlBoard.

9-

/x,r & Page 3 of 5

(ix) The project authorities shall strictly comply '"vith the rules and guidelines under

Manufacture, Storage and Import of Hazardous Chemicals Rules, 1989 as

amended in October, 1,994 and January, 2000 and Hazardous Waste

(Management and Handling) Rules, i989, as amended from time to time.

Authorization from the SPCB shall be obtained for collection, treatment, storage,

and disposal ofhazardous lvastes

The overall noise levels in and arounrl the plant area shall be kept weii within the

standartls by providing noise control measut'es including acoustic hoods.

silelcers, enclosures eto. on all sources of nr-rise generation. The ambient noise

levels shall conform to the standards prescribed under Environment (Protection)

Act, 1986 Rules, 1989 viz.75 dBA (day time) and70 dBA (night time).

The company shall develop rain water harvesting structures to harvest the run offwater for recharge of ground water.

The company shall undertake eco-developmental measures including communitywelfare measures in the project area for the overall improvement oi the

environment. The eco-development plan should be submitted to the SPCB withinthree months of receipt of this letter for approval.

The project proponent shall also comply r,vith all the environmental protection

measures and safeguards proposed in the EIA/EMP report.

A sepalate Environmental Management Cell equipped witir full fledged

laboratory facilities shall be set up to carry out the Environmental Manzigement

and Monitoring flurctions.

The project authorities shall earmark adequate funds to implement the conditions

stipulated by the Ministry of Environment and Forests as well as the State

Government along with the implementation schedule for all the conditions

stipulated herein. The funds so provided shall not be diverted for any other

purpose.

The implementation of the project vis-d-vis environmental action plans shall be

monitored by the concerned Regional Office of the lvlinistry/SPcB / CPCB. Asix rnonthly compliance status report shall be submitted to monitoring agencies

and shall be posted on the ,,vebsite of the Company.

(x)

(xi) ---

(xii)

(xiii)

99'

(xv)

(xvi)

(xvii) The project proponent shall inform the public that the project has been accorded

environmenial ciearance by the },zlinistry and copies of the clearance letter are

available ."vith the SPCB and may also be seen at Website of the Ministry ai

http://envfor.nic.in. This shall be advertised rvithin seven days from the date ofissue of the clearance letter, at least in tr.vo local newspapers that are r,vldely

circulated in the region of r,vhich one shall be in the vernacular language of the

-{i\,- <x.\\ r, , "*-"'.V Page z1 of 5

loc-ality c,oncrcrncd and a c:opy c)f thc: szuuc: shal1 bc forrvarded to the coucerued

Rcgional Officc of the lvlinistry.

(xviii) The project authorities shall inform the Regional Office as rvell as the Nlinistry,

the date of financial closurq ancl final appro','al of the project by the concerned

authorities ahd ihe date of start of the project'

6. The Ministry may revoke or suspend the clearance, if implementation of any of

the abo',ze conditions is not satisfrictor.v-.

./. The Ministry reserves the right to stipulate additional conditions, if found

necessary. The company in a time bound mallnel will implement these conditions.

g. Any appeal against this environmental clearance shall lie r.vith the National

Environment Appellate Authority, if preferred within a period of 30 days as prescribed

under Section 11 of the National Environment Appellate Authority Act,199'7.

9- The above conditions will be enforced, infer-alia under the provisions of the

Water(Preventit.rn & Control of Pollutir-rn) Aot,1974' Air (Prevention & Control of

Pollution) Act, 1981, the Environment (Protection) Act, 1986 Hazaldous Wastcs

(lVlanagement and Ilandling) Rules, 2003 and the Pubiic Liabilitv Insurance Act, 1991

along *ith th.i. amendments and rules. A-_+

(Y'!' r\lalviYa)ioint Direc.ior

Copy to : -

1. Secretary, State Deptt. of Environment, Govemment of Uttar Pradesh, Room No'

13, Ner,v Buildings, Vidhan Bhavan, Lucknow -226001, UP'

The Chairman, Central Pollution Control Board, Parivesh Bhavan, CBD-cum-

Office Complex, East Arjun Nagar, Delhi-110032'

3. The Chainnan. Uttar Pradesh State Pollution Control Board, 111 Floor, PICUP

Bhavan, Vibhuti Khand, Lucknorv-226020.The Chief Conservator of Forests, Regional Office( Central Region), B-lll2,Sector FI, Aliganj, Lucknorv-226020.lvlonitoring Cell , Ministry of Environment and Forests, ParyavarunBhavan, CGO

Complex, Ner,v Delhi- 110003.

6. Guard File.7. Monitoring File.8. Record File.

(Ii.S. Ntral.-'iya)

Joint Director

2.

4.

5.

Page 5 r,rf 5

Annexure III: CERTIFIED COMPLIANCE

REPORT