  T P DIVISION – TRANSMISSION COMMISSIONING DEPARTMENT SITE TEST REPORT CONTRACT NO: NAME OF SUB STATION: Main Contractor Name of Bay: Page no: Consultant: Equipment: Inter Distribution Transformer (IDT) Manufacturer SCADA No: Date DEWA/TP/132 KV/IDT /1.5.1.1.2.04 Rev.0 INDEX Sl.No. Item Format No. 1 Transformer general data DEWA/TP/TCD/IDT/ST/2 2 Final checks after energization DEWA/TP/TCD/IDT/ST/3-A 3 Final checks prior to energization DEWA/TP/TCD/IDT/ST/3-B 4 Initial Checks (to be done prior to starting site testing) DEWA/TP/TCD/IDT/ST/4 5 Site processing details DEWA/TP/TCD/IDT/ST/4 6 Visual inspection DEWA/TP/TCD/IDT/ST/ 5~7 7 Insulation Resistance measurement of Transformer (Winding &core) DEWA/TP/TCD/IDT/ST/8 8 2kV test on core and clamping structure DEWA/TP/TCD/IDT/ST/8 9 Ratio and Vector group tests DEWA/TP/TCD/IDT/ST/9 10 Magnetizing current measurement DEWA/TP/TCD/IDT/ST/10 11 Winding Resistance measurement DEWA/TP/TCD/IDT/ST/11 12 Short circuit Impedance measurement DEWA/TP/TCD/IDT/ST/12 13 Measurement of Tan delta and Capacitance of Winding DEWA/TP/TCD/IDT/ST/ 13 14 Measurement of Tan delta and Capacitance of Bushings DEWA/TP/TCD/IDT/ST/13 15 Calibration of Temp. Indicators DEWA/TP/TCD/IDT/ST/14 16 Hot spot Gradient check of Winding Temperature indicators DEWA/TP/TCD/IDT/ST/15 17 Ratio check of CTs for winding temperature indicators DEWA/TP/TCD/IDT/ST/ 15 18 Measurement of transducer out put for Remote Temp. Indicator DEWA/TP/TCD/IDT/ST/16 19 On load Tap changer- Operation checks DEWA/TP/ TCD/IDT/ST/17 20 Tap position indication check DEWA/TP/TCD/IDT/ST/18 21 Insulation resistance check of devices DEWA/TP/TCD/IDT/ST/19 22 Fan Motor check DEWA/TP/TCD/IDT/ST/ 20 23 Operation check of cooling equipments DEWA/TP/TCD/IDT/ST/2 1 24 Protective device wiring/operat ion check DEWA/TP/TCD/IDT/ST/ 22 25 Cable box inspection DEWA/TP/TCD/IDT/ST/23 26 Checks on AVR DEWA/TP/TCD/IDT/ ST/24~25 27 Tap changer & cooler alarms / indications check DEWA/TP/TCD/IDT/ST/2 6 28 Tap Changer Parallel operation checks DEWA/TP/ TCD/IDT/ST/27~28 29 Oil leak test DEWA/TP/TCD/IDT/ ST/29 30 BDV test on insulating oil DEWA/TP/TCD/IDT/ ST/30 31 Test results/propertie s of Insulating oil before filling in Transformer DEWA/TP/TCD/IDT/ST/31 32 Tests on transformer oil after complete site processing DEWA/TP/TCD/IDT/ST/32 33 DGA test on Transformer oil DEWA/TP/TCD/IDT/ST/ 33 34 Check on small wiring DEWA/TP/TCD/IDT/ST/34 35 Checks during Fire Deluge operation DEWA/TP/TCD/IDT/ST/ 34 36 Frequency response analysis DEWA/TP/TCD/IDT/ST/ 35 Checked By Verified By Verified By Signature Name Organization Consultant DEWA DEWA/TP/TCD/IDT/ST/1 TP / TCD / QP01-A04 2012 Revision 1 of 36

Annexure 4 - Transformer

Embed Size (px)

DESCRIPTION

Annexure 4 - Transformer

Citation preview

  • T P DIVISION TRANSMISSION COMMISSIONING DEPARTMENT SITE TEST REPORT

    CONTRACT NO: NAME OF SUB STATION: Main Contractor Name of Bay:

    Page no: Consultant: Equipment: Inter Distribution Transformer(IDT) Manufacturer SCADA No: Date

    DEWA/TP/132 KV/IDT /1.5.1.1.2.04 Rev.0

    INDEX

    Sl.No. Item Format No. 1 Transformer general data DEWA/TP/TCD/IDT/ST/2 2 Final checks after energization DEWA/TP/TCD/IDT/ST/3-A 3 Final checks prior to energization DEWA/TP/TCD/IDT/ST/3-B 4 Initial Checks (to be done prior to starting site testing) DEWA/TP/TCD/IDT/ST/4 5 Site processing details DEWA/TP/TCD/IDT/ST/4 6 Visual inspection DEWA/TP/TCD/IDT/ST/5~7 7 Insulation Resistance measurement of Transformer (Winding &core) DEWA/TP/TCD/IDT/ST/8 8 2kV test on core and clamping structure DEWA/TP/TCD/IDT/ST/89 Ratio and Vector group tests DEWA/TP/TCD/IDT/ST/910 Magnetizing current measurement DEWA/TP/TCD/IDT/ST/10 11 Winding Resistance measurement DEWA/TP/TCD/IDT/ST/11 12 Short circuit Impedance measurement DEWA/TP/TCD/IDT/ST/12 13 Measurement of Tan delta and Capacitance of Winding DEWA/TP/TCD/IDT/ST/13 14 Measurement of Tan delta and Capacitance of Bushings DEWA/TP/TCD/IDT/ST/1315 Calibration of Temp. Indicators DEWA/TP/TCD/IDT/ST/1416 Hot spot Gradient check of Winding Temperature indicators DEWA/TP/TCD/IDT/ST/15 17 Ratio check of CTs for winding temperature indicators DEWA/TP/TCD/IDT/ST/15 18 Measurement of transducer out put for Remote Temp. Indicator DEWA/TP/TCD/IDT/ST/16 19 On load Tap changer- Operation checks DEWA/TP/TCD/IDT/ST/17 20 Tap position indication check DEWA/TP/TCD/IDT/ST/1821 Insulation resistance check of devices DEWA/TP/TCD/IDT/ST/1922 Fan Motor check DEWA/TP/TCD/IDT/ST/20 23 Operation check of cooling equipments DEWA/TP/TCD/IDT/ST/21 24 Protective device wiring/operation check DEWA/TP/TCD/IDT/ST/22 25 Cable box inspection DEWA/TP/TCD/IDT/ST/23 26 Checks on AVR DEWA/TP/TCD/IDT/ST/24~2527 Tap changer & cooler alarms / indications check DEWA/TP/TCD/IDT/ST/26 28 Tap Changer Parallel operation checks DEWA/TP/TCD/IDT/ST/27~28 29 Oil leak test DEWA/TP/TCD/IDT/ST/29 30 BDV test on insulating oil DEWA/TP/TCD/IDT/ST/30 31 Test results/properties of Insulating oil before filling in Transformer DEWA/TP/TCD/IDT/ST/31 32 Tests on transformer oil after complete site processing DEWA/TP/TCD/IDT/ST/32 33 DGA test on Transformer oil DEWA/TP/TCD/IDT/ST/33 34 Check on small wiring DEWA/TP/TCD/IDT/ST/34 35 Checks during Fire Deluge operation DEWA/TP/TCD/IDT/ST/34 36 Frequency response analysis DEWA/TP/TCD/IDT/ST/35

    Checked By Verified By Verified By

    Signature

    Name

    Organization Consultant DEWA DEWA/TP/TCD/IDT/ST/1

    TP / TCD / QP01-A042012 Revision

    1 of 36

  • T P DIVISION TRANSMISSION COMMISSIONING DEPARTMENT SITE TEST REPORT

    CONTRACT NO: NAME OF SUB STATION: Main Contractor Name of Bay:

    Page no: Consultant: Equipment: Inter Distribution Transformer(IDT) Manufacturer SCADA No: Date

    DEWA/TP/132 KV/IDT /1.5.1.1.2.04 Rev.0

    1.0 TRANSFORMER GENERAL DATA HV LV

    RATING ONAN / ONAF MVA

    NOMINAL VOLTAGE kV

    FULL LOAD CURRENT (RATED TAP) A

    VECTOR GROUP

    SHORT CIRCUIT IMPEDANCE HV/LV Max. Tap ( 1 ) Rated Tap ( ) Min. Tap ( )

    TYPE/FORM (given by manufacturer)

    YEAR OF MANUFACTURE

    ZERO SEQUENCE IMPEDANCE

    NO OF TAPS

    NO OF FANS

    NO OF PUMPS

    NO OF RADIATORS

    TYPE OF OIL

    TOTAL OIL QUANTITY

    BREATHER TYPE

    OLTC MAKE / MOTOR

    OLTC TYPE / MOTOR

    TOTAL WEIGHT

    CONSERVATOR TYPE

    NEUTRAL GROUNDING METHOD

    TRAFO TYPE (ICT, IBT, IDT Etc.)

    SUB STATION VOLTAGE

    TYPE OF ROOF

    OLTC COUNTER READING

    COMMISSIONING DATE OF TRANSFORMER.

    Checked By Verified By Verified By

    Signature

    Name

    Organization Consultant DEWA DEWA/TP/TCD/IDT/ST/2

    TP / TCD / QP01-A042012 Revision

    2 of 36

  • T P DIVISION TRANSMISSION COMMISSIONING DEPARTMENT SITE TEST REPORT

    CONTRACT NO: NAME OF SUB STATION: Main Contractor Name of Bay:

    Page no: Consultant: Equipment: Inter Distribution Transformer(IDT) Manufacturer SCADA No: Date

    DEWA/TP/132 KV/IDT /1.5.1.1.2.04 Rev.0

    2.0 FINAL CHECKS (To be carried out after energization) Date:

    1. Check for any abnormal sound in the transformer after commissioning

    2. Check for any abnormality during OLTC tap operation

    3. Check/Ensure no persisting alarms at the AVR & HMI

    4. Oil Temperature Indicator reading C

    5. HV Winding Temperature Indicator Reading C

    6. LV Winding Temperature Indicator Reading C

    7. Remote Winding Temperature Indicator Reading C

    2.1 FINAL CHECKS (To be carried out during Load Test) Date:

    1. Load Test current in the Transformer Amps

    2. HV WTI Ammeter Reading Amps

    3. LV WTI Ammeter Reading Amps

    4. RWTI Ammeter Reading Amps

    5. HV WTI circuit current measurement using clamp meter Amps

    6. LV WTI circuit current measurement using clamp meter Amps

    7. RWTI circuit current measurement using clamp meter Amps

    8. Oil Temperature Indicator reading C

    9. HV Winding Temperature Indicator Reading C

    10. LV Winding Temperature Indicator Reading C

    11. Remote Winding Temperature Indicator Reading C

    Calibration Details Checked By Witnessed By Witnessed By

    Signature

    Name Organization Consultant DEWA

    DEWA/TP/TCD/IDT/ST/3-A

    TP / TCD / QP01-A042012 Revision

    3 of 36

  • T P DIVISION TRANSMISSION COMMISSIONING DEPARTMENT SITE TEST REPORT

    CONTRACT NO: NAME OF SUB STATION: Main Contractor Name of Bay:

    Page no: Consultant: Equipment: Inter Distribution Transformer(IDT) Manufacturer SCADA No: Date

    DEWA/TP/132 KV/IDT /1.5.1.1.2.04 Rev.0

    3.0 FINAL CHECKS (To be carried out prior to energization) Correctness of oil level in all bushings and oil filled chambers.

    All air release plugs (including radiators)& Buchholz relays vented

    Pressure relief diaphragm intact

    All bushing connections & test tap tightness checked

    Neutral & Transformer Earth connection satisfactory

    Position of all switches in MK & MDU ON position.

    All CT connections are through / shorted & CT test windings open

    WTI Ammeter circuit link connections are correct *Link Open loop resistance: *Link Closed Loop resistance:

    No damage for insulators and clean

    No oil leakage

    Rating, diagram, Id plates fitted satisfactorily

    Ensure that the silica gel is enviro gel type

    Breathers satisfactory, oil level correct to the mark and pipe work joint is tight

    All cabling and wiring visually satisfactory

    All valves are in correct operational position with respect to valve schedule diagram (Ensure valves on both sides of relay and to HV cable box are open).

    All valves labeled & locked and blanking covers provided wherever necessary

    All protective and cable box covers fitted.

    All pre-commissioning tests (including oil tests) completed & results are satisfactory.

    Condition of Gland earthing of all cables in MK & MDU shall be satisfactory.

    Permanent Identification tags for all control cables on both ends

    Availability of marked up drawing copy in MK , MDU & & Record room

    All openings (cable entry) in to AVR panel, MK and HV/LV cable box shall be closed.

    Availability of power socket for oil filtration unit.

    LV cable box connections shall be ensured

    Ensure control cable gland and wiring connection tightness at device junction boxes and MK.

    Record room verified for availability of records.

    Locking of protective B relay & PRD released and locks if any are removed

    No persisting alarms at AVR panel/ SCS /SCC (except VT supply absent)

    *To be ensured by opening any one link in the CT circuit and entire path shall be measured with link in open and closed condition. Ensure link is closed and tightened after measurements.

    Checked By Witnessed By Witnessed By

    Signature

    Name Organization Consultant DEWA

    DEWA/TP/TCD/IDT/ST/3-B

    TP / TCD / QP01-A042012 Revision

    4 of 36

  • T P DIVISION TRANSMISSION COMMISSIONING DEPARTMENT SITE TEST REPORT

    CONTRACT NO: NAME OF SUB STATION: Main Contractor Name of Bay:

    Page no: Consultant: Equipment: Inter Distribution Transformer(IDT) Manufacturer SCADA No: Date

    DEWA/TP/132 KV/IDT /1.5.1.1.2.04 Rev.0

    4.0 Initial check (To be done prior to starting the test) No Checks Remarks 1 Availability of safe receipt report from I & QA 2 Ensure safe transit based on shock recorder data 3 Ensure proper site processing 4 Positioning of anti vibration pad 5 Ensure uniform thickness of anti vibration pad 6 Availability of related Specification 7 Availability of approved drawings & installation manual 8 Availability of factory test reports 9 Maintaining site notes 10 Compliance of oil TC to DEWA reference oil (if TC is incomplete, test

    shall be done at independent lab)

    11 Verification of Minimum / maximum oil level alarm (shall be done during oil filling by simulating actual condition) a) Main conservator (MOLG/ Prismatic MIN/MAX alarm operation) b) Quantity of oil needed to achieve MAX alarm(Ltrs) c) Quantity of oil needed to be drained to achieve MIN alarm(Ltrs) d) Quantity of oil needed to be drained from MIN position to initiate MT Bucholz alarm (Ltrs) * e) OLTC conservator(MOLG/ Prismatic MIN/MAX alarm check)

    5.0 Site processing Details ( Site processing shall be done as per the O&M Manual) Equipment details Make: Capacity: Sl No: Last Date conditioning of purifier

    5.1. Initial oil treatment (in storage tank) records BDV Water content Tan delta Oil TC from refinery

    TC No. 5.2 Vacuum/ Treatment details

    Degree of vacuum (min) Duration (hrs) Maintained: Mfrs proposal: Maintained: Mfrs proposal:

    5.3 Oil Circulation details of IDT & OLTC Date Time Oil temp (C) Vacuum (in

    purifier) IR value of IDT.

    Inlet Out let OTI Ambient

    Attach separate sheet for balance recordings * Ensure minimum 20 - 30 litres available

    Tested By Witnessed By Witnessed by

    Signature

    Name Organization Consultant DEWA

    DEWA/TP/TCD/IDT/ST/4

    TP / TCD / QP01-A042012 Revision

    5 of 36

  • T P DIVISION TRANSMISSION COMMISSIONING DEPARTMENT SITE TEST REPORT

    CONTRACT NO: NAME OF SUB STATION: Main Contractor Name of Bay:

    Page no: Consultant: Equipment: Inter Distribution Transformer(IDT) Manufacturer SCADA No: Date

    DEWA/TP/132 KV/IDT /1.5.1.1.2.04 Rev.0

    6.0 Visual Inspection No Check point Criteria Remarks/Date 6.1 Transformer main body 01 Phase identification label As per approved name plate 02 Rating & Valve Schedule plate Thickness:

    Material

    03

    Accessories & Devices a) Identification b) Type form

    (Enclose approved list showing type/form) As per GOA As per GOA/ Approved

    04 Fan a) Rating b) Blades c) Fan guards d) Mounting of Fan

    Galvanized steel/ Aluminum Shall be available at both sides Shall be independently mounted

    with proper Anti vibration arrangement

    05 Free space under fan 750mm (min) 06 Valves

    a) Main Tank fill, filter & draining b) Sampling valves (top, bottom & cable box) c) Cable box fill, filter & draining d) OLTC fill, filter and & draining e) Hydran valve

    Size of valves shall be 50mm 15mm 25mm 25mm 50 mm

    07 Pressure relief device a) Make b) Operating pressure

    Trafo OLTC Cable box

    08 Bushing a) Make b) Rating

    HV HVN LV

    09 Neutral Earthing a) Touch potential insulation b) Size Earthing cable section

    N bar shall be insulated (1 kV) 300mm2 (min)

    10 Core and clamp bushing Shall be identified

    Verified By Verified By Verified By

    Signature

    Name Organization Consultant DEWA

    DEWA/TP/TCD/IDT/ST/5

    TP / TCD / QP01-A042012 Revision

    6 of 36

  • T P DIVISION TRANSMISSION COMMISSIONING DEPARTMENT SITE TEST REPORT

    CONTRACT NO: NAME OF SUB STATION: Main Contractor Name of Bay:

    Page no: Consultant: Equipment: Inter Distribution Transformer(IDT) Manufacturer SCADA No: Date

    DEWA/TP/132 KV/IDT /1.5.1.1.2.04 Rev.0

    No Check point Criteria Remarks/Date 11 Identification of devices MK & Enclosures Shall be identified as per GOA 12 Accessibility of components and devices Easy access shall be available for

    buchholz, Bladder rupture, oil level indicators and MK components.

    13 Linking and De-linking of LV Bus bar Easy accessibility shall be available inside LV cable box

    14 Earth connection between tank and cover One connection shall be located near to core/ clamp earthing

    15 LV Bus bar, flexible Neutral terminal and neutral bar

    Shall be tin/ silver plated

    16 Thickness of cable box and covers 4mm 17 OTI&WTI capillary tubes Shall be dressed properly using

    stainless steel ties and shall be identified at both ends.

    18 Labels 1) All external parts identification label shall be stainless steel 2) Device label shall be stainless steel

    6.2 Marshalling Kiosk/ Motor Drive Unit 01 Contacts, components and other parts which

    require periodic maintenance Accessibility shall be there for these contacts

    02 Wiring Shall be neatly arranged in trunking 03 Spare terminals Min 20% spare shall be available 04 CT terminals Test barrels shall be available 05 Doors . 1) Shall be lockable type

    2) Front window shall be glass & located such that view of indicators are obtained

    06 Redundant supply Shall be available 07 Labels Shall be permanent engraved 08 Anti vibration mounting Shall be used for mounting MK 6.3 Remote Tap Changer Panel (AVR Panel) 01 AVR supporting arrangement Shall be as per drawing 02 Contacts, components and other pats which

    require periodic maintenance Accessibility shall be there for these contacts

    03 Bottom terminal boards Shall be above 200mm from cable crutch of incoming multi core cable

    Verified By Verified By Verified By

    Signature

    Name Organization Consultant DEWA

    DEWA/TP/TCD/IDT/ST/6

    TP / TCD / QP01-A042012 Revision

    7 of 36

  • T P DIVISION TRANSMISSION COMMISSIONING DEPARTMENT SITE TEST REPORT

    CONTRACT NO: NAME OF SUB STATION: Main Contractor Name of Bay:

    Page no: Consultant: Equipment: Inter Distribution Transformer(IDT) Manufacturer SCADA No: Date

    DEWA/TP/132 KV/IDT /1.5.1.1.2.04 Rev.0

    No Check point Criteria Remarks/Date 04 Wiring Shall be neatly arranged in trunking 05 Spare terminals Min 20% spare shall be available 06 Labels Shall be permanent engraved 6.4 General 01 Oily water tank 1) Shall be available at S/S 02 Spillage oil & Fire water 2) Shall be directed to oily water

    tank

    03 Cobble stone Size shall be 35 to 50mm 04 Level of water in oily water tank Shall be monitored 05 Roof There shall be no gap at roofing

    allowing bird entry

    06 IDT room Lighting Availability of Essential/ Non Essential/Emergency lightning shall be confirmed.

    07 Record room Record shall be kept in lockable exclusive with glass paneled (Attach list of documents available in room)

    08 Maintenance access 1) Accessibility shall be there at the top of transformer 2) Safe Movement inside IDT room shall not be obstructed by pipelines.

    09 Jacking facility To facilitate safe jacking of IDT, the jacking pads shall be inside the plinth.

    Verified By Verified By Verified by

    Signature

    Name Organization Consultant DEWA

    DEWA/TP/TCD/IDT/ST/7

    TP / TCD / QP01-A042012 Revision

    8 of 36

  • T P DIVISION TRANSMISSION COMMISSIONING DEPARTMENT SITE TEST REPORT

    CONTRACT NO: NAME OF SUB STATION: Main Contractor Name of Bay:

    Page no: Consultant: Equipment: Inter Distribution Transformer(IDT) Manufacturer SCADA No: Date

    DEWA/TP/132 KV/IDT /1.5.1.1.2.04 Rev.0

    7.0 INSULATION RESISTANCE MEASUREMENT OF TRANSFORMER (WINDING AND CORE & CLAMP)

    7.1 INSULATION RESISTANCE - WINDING Measured at 5000 Volts Oil temperature - C

    Measured between 15 Seconds (M. Ohms)

    60 Seconds (M. Ohms)

    600 Seconds

    (M. Ohms)

    P.I. value (R600/R60)

    HV LV and EARTH

    LV - HV and EARTH

    HV LV

    Remarks:- PI value shall be >1.5 7.2 INSULATION RESISTANCE - CORE & CLAMP

    Measured at 500 volts Oil Temperature - C Measured between Before 2kv Test (M.ohms)

    After 2kv Test (M.ohms) Remarks

    Core Earth

    Clamps Earth

    Core clamps

    Note: Confirm that core and clamp are identified and having isolation 8.0 2kV test on Core and clamping structure 1. Applied 2kV, AC, between core & clamps connected together and tank for one minute

    Leakage current - mA Result : Withstood / Failed

    2. Applied 2kV, AC, between core and core clamps for one minute Leakage current - mA Result : Withstood / Failed

    Calibration Details Tested By Witnessed By Witnessed by

    Signature

    Name Organization Consultant DEWA

    DEWA/TP/TCD/IDT/ST/8

    TP / TCD / QP01-A042012 Revision

    9 of 36

  • T P DIVISION TRANSMISSION COMMISSIONING DEPARTMENT SITE TEST REPORT

    CONTRACT NO: NAME OF SUB STATION: Main Contractor Name of Bay:

    Page no: Consultant: Equipment: Inter Distribution Transformer(IDT) Manufacturer SCADA No: Date

    DEWA/TP/132 KV/IDT /1.5.1.1.2.04 Rev.0

    9.0 RATIO AND VECTOR GROUP TESTS 9.1 Ratio Check Tap HV applied volts LV measured Volts Measured

    ratio Nominal ratio

    Error (%)

    Remarks U-N V-N W-N u-v v-w w-u

    1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19

    Voltage continuity check during tap changing operations - OK / Not OK 9.2 Vector group check

    Connected terminals 1U& 2u together, Tap changer being on rated tap. Applied 3-phase voltage on HV terminals.

    Vector diagram

    Measured voltage:

    U-V V-v V-w V-W W-w W-v W-U U-N

    Remarks:

    Calibration Details Tested By Witnessed By Witnessed by

    Signature

    Name Organization Consultant DEWA

    DEWA/TP/TCD/IDT/ST/9

    TP / TCD / QP01-A042012 Revision

    10 of 36

  • T P DIVISION TRANSMISSION COMMISSIONING DEPARTMENT SITE TEST REPORT

    CONTRACT NO: NAME OF SUB STATION: Main Contractor Name of Bay:

    Page no: Consultant: Equipment: Inter Distribution Transformer(IDT) Manufacturer SCADA No: Date

    DEWA/TP/132 KV/IDT /1.5.1.1.2.04 Rev.0

    10.0 MAGNETIZING CURRENT MEASUREMENT 10.1 HV Winding

    Tap No. Applied voltage (volt) Measured exciting current (mA) Remarks U phase V phase W phase

    1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19

    10.2 LV Winding

    Applied voltage (volt)

    Measured exciting current (mA) Remarks U phase V phase W phase

    Calibration Details Tested By Witnessed By Witnessed by

    Signature

    Name

    Organization Consultant DEWA DEWA/TP/TCD/IDT/ST/10

    TP / TCD / QP01-A042012 Revision

    11 of 36

  • T P DIVISION TRANSMISSION COMMISSIONING DEPARTMENT SITE TEST REPORT

    CONTRACT NO: NAME OF SUB STATION: Main Contractor Name of Bay:

    Page no: Consultant: Equipment: Inter Distribution Transformer(IDT) Manufacturer SCADA No: Date

    DEWA/TP/132 KV/IDT /1.5.1.1.2.04 Rev.0

    11.0 WINDING RESISTANCE MEASUREMENT 11.1 HV WINDING (Temp C)

    Tap No.

    Applied current (A)

    Measured Resistance (Ohms) Factory value at

    75C() Remarks

    U N V N W N Average resistance R

    @ t C @ 75 C 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19

    Note : Graph plotted ( Tap no on x-axis and R on y-axis) for all the three phases to be attached)

    TAP No U V () V - W () W U () Average @ t C ()

    11.2 LV WINDING (Temp C) u v / u n

    (Ohms) v w / v n

    (Ohms) w u / w n

    (Ohms) Average (Ohms) Factory value @ 75 C

    (Ohms) @ t C @ 75 C

    Calibration Details Tested By Witnessed By Witnessed by

    Signature

    Name Organization Consultant DEWA

    DEWA/TP/TCD/IDT/ST/11

    TP / TCD / QP01-A042012 Revision

    12 of 36

  • T P DIVISION TRANSMISSION COMMISSIONING DEPARTMENT SITE TEST REPORT

    CONTRACT NO: NAME OF SUB STATION: Main Contractor Name of Bay:

    Page no: Consultant: Equipment: Inter Distribution Transformer(IDT) Manufacturer SCADA No: Date

    DEWA/TP/132 KV/IDT /1.5.1.1.2.04 Rev.0

    12 SHORT CIRCUIT IMPEDANCE MEASUREMENT

    Tap No.

    Tap I (A)

    Measured voltage on HV (volts)

    Measured HV current (Amps)

    Impedance (%) at . MVA base

    Factory value (%) U V V W W U U V W U V W Average

    1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19

    Impedance (%) = *Rated current x Measured voltage x 100 (* At corresponding tap) *Rated voltage x Measured current

    Calibration Details Tested By Witnessed By Witnessed by

    Signature

    Name Organization Consultant DEWA

    DEWA/TP/TCD/IDT/ST/12

    TP / TCD / QP01-A042012 Revision

    13 of 36

  • T P DIVISION TRANSMISSION COMMISSIONING DEPARTMENT SITE TEST REPORT

    CONTRACT NO: NAME OF SUB STATION: Main Contractor Name of Bay:

    Page no: Consultant: Equipment: Inter Distribution Transformer(IDT) Manufacturer SCADA No: Date

    DEWA/TP/132 KV/IDT /1.5.1.1.2.04 Rev.0

    13.0 MEASUREMENT OF TAN DELTA & CAPACITANCE OF WINDING Ambient temp. Top oil temp.

    Sl. No

    APPLIED VOLTAGE

    (kV)

    CAPACITANCE (pF) CURREN

    T (mA)

    *Dissipation Factor (TAN DELTA) (%) Correction factor k=

    Measured combination

    Measured Value Factory Value

    Difference (%) @

    C @ 20C

    1

    2

    3

    4

    5

    6

    14.0 MEASUREMENT OF TAN DELTA & CAPACITANCE OF BUSHINGS Make and Type of bushings:

    Sl No

    Applied voltage

    (kV)

    Measured on (Sl no. of bushings)

    CAPACITANCE (pF) Current

    (mA)

    *Dissipation Factor (TAN DELTA) (%) Correction factor k=

    Measured value

    Factory value

    Difference % @ C @ 20C

    1 HV U

    2 HV V

    3 HV W

    4 HV N

    Note:1. Measured values of tan delta and capacitance shall be comparable to factory test report 2.Ensure test tap cap is put back & tight

    Calibration Details Tested By Witnessed By Witnessed by

    Signature

    Name Organization Consultant DEWA

    DEWA/TP/TCD/IDT/ST/13

    TP / TCD / QP01-A042012 Revision

    14 of 36

  • T P DIVISION TRANSMISSION COMMISSIONING DEPARTMENT SITE TEST REPORT

    CONTRACT NO: NAME OF SUB STATION: Main Contractor Name of Bay:

    Page no: Consultant: Equipment: Inter Distribution Transformer(IDT) Manufacturer SCADA No: Date

    DEWA/TP/132 KV/IDT /1.5.1.1.2.04 Rev.0

    15.0 CALIBRATION OF TEMPERATURE INDICATORS

    15.1 OIL TEMPERATURE INDICATOR

    MAKE: TYPE: SERIAL NO.

    BATH TEMPERATURE (0C)

    INDICATOR READING (0C)

    ALARM CONTACT SETTING (0C) OPERATION OF CONTACTS (0C)

    TRIP CONTACT SETTING (0C) OPERATION OF CONTACTS (0C)

    COOLER START (0C) COOLER STOP (0C)

    Remarks: 15.2 WINDING TEMPERATURE INDICATOR (HV)

    MAKE: TYPE: SERIAL NO.

    BATH TEMPERATURE (0C)

    INDICATIOR READING ( 0C)

    ALARM CONTACT SETTING (0C) OPERATION OF CONTACTS (0C)

    TRIP CONTACT SETTING (0C) OPERATION OF CONTACTS (0C)

    COOLER START (0C) COOLER STOP (0C)

    Remarks: - 15.3 WINDING TEMPERATURE INDICATOR (LV)

    MAKE: TYPE: SERIAL NO.

    TEST TEMPERATURE (0C)

    INDICATIOR READING (0C)

    ALARM CONTACT SETTING (0C) OPERATION OF CONTACTS (0C)

    TRIP CONTACT SETTING (0C) OPERATION OF CONTACTS (0C)

    COOLER START (0C) COOLER STOP (0C)

    Remarks: - Note: a). Calibration of indicators shall be done simultaneously and the temperature reading between any two indicators

    shall be less than 20C. b) Ensure that the red pointer is appropriately set. Calibration Details

    Tested By Witnessed By Witnessed by

    Signature

    Name Organization Consultant DEWA

    DEWA/TP/TCD/IDT/ST/14

    TP / TCD / QP01-A042012 Revision

    15 of 36

  • T P DIVISION TRANSMISSION COMMISSIONING DEPARTMENT SITE TEST REPORT

    CONTRACT NO: NAME OF SUB STATION: Main Contractor Name of Bay:

    Page no: Consultant: Equipment: Inter Distribution Transformer(IDT) Manufacturer SCADA No: Date

    DEWA/TP/132 KV/IDT /1.5.1.1.2.04 Rev.0

    16.0 HOT SPOT GRADIENT CHECK OF WINDING TEMPERATURE INDICATORS

    Loc

    al /

    Rem

    ote

    Indicator Sl No.

    Bath Temp ( C)

    Current injected at WT terminal

    (A)

    WTI reading

    (C)

    Hot spot gradient (C) Remarks Measured =

    (WTI reading bath temp )

    Required

    Loc

    al HV- ONAN-

    ONAF- 1.2 pu-

    Loc

    al LV- ONAN-

    ONAF- 1.2 pu-

    Rem

    ote HV- ONAN-

    ONAF- 1.2 pu-

    Rem

    ote LV- ONAN-

    ONAF- 1.2 pu-

    Note: Hot Spot Winding Gradient of WTI shall be set based on the maximum gradient obtained during heat run test at ONAN or ONAF rating which ever is higher. Test at other ratings are for reference & subject to review. Current shall be applied after attaining steady temperature reading of the indicator. Sufficient time (approximately 40 minutes) shall be given for taking indicator reading, after current injection.

    17.0 RATIO CHECK OF CTs FOR WINDING TEMPERATURE INDICATORS

    CT location / Identification

    No.

    Name plate ratio

    *Primary applied current

    Measured secondary

    current

    Measured ratio

    * Secondary winding resistance

    * Measurement done at CT / MK terminals

    Calibration Details Tested By Witnessed By Witnessed by

    Signature

    Name Organization Consultant DEWA

    DEWA/TP/TCD/IDT/ST/15

    TP / TCD / QP01-A042012 Revision

    16 of 36

  • T P DIVISION TRANSMISSION COMMISSIONING DEPARTMENT SITE TEST REPORT

    CONTRACT NO: NAME OF SUB STATION: Main Contractor Name of Bay:

    Page no: Consultant: Equipment: Inter Distribution Transformer(IDT) Manufacturer SCADA No: Date

    DEWA/TP/132 KV/IDT /1.5.1.1.2.04 Rev.0

    18.0 MEASUREMENT OF TRANSDUCER OUTPUT FOR REMOTE TEMP. INDICATOR DETAILS OF DEVICES ROTI : RWTI (HV) : RWTI (LV) : Device connected to SCS/SCC

    Bath temp. (C)

    OTI WTI (HV) WTI (LV) Reading at Remarks OTI

    reading Transducer output (mA)

    WTI reading

    Transducer output (mA)

    WTI reading

    Transducer output (mA) SCS SCC

    40 50 60 70 80 90 100 110 120 130 140 150

    Note: Reading at SCS/SCC shall be done at ambient temperature.

    Calibration Details Tested By Witnessed By Witnessed by

    Signature

    Name

    Organization Consultant DEWA DEWA/TP/TCD/IDT/ST/16

    TP / TCD / QP01-A042012 Revision

    17 of 36

  • T P DIVISION TRANSMISSION COMMISSIONING DEPARTMENT SITE TEST REPORT

    CONTRACT NO: NAME OF SUB STATION: Main Contractor Name of Bay:

    Page no: Consultant: Equipment: Inter Distribution Transformer(IDT) Manufacturer SCADA No: Date

    DEWA/TP/132 KV/IDT /1.5.1.1.2.04 Rev.0

    19.0 ON LOAD TAP CHANGER OPERATION CHECKS Tap changer details Tap Changer Motor Make - Make - Type/Model - Motor Type - Sl. No. - Rating (KW) - MDU Type - Voltage - Year of Mfg. - Rated current -

    Sl.No. Description of check Remarks 1 Local operation possible when selector s/w in local position 2 Handle interlock 3 End limit switches in extreme taps 4 Step by step operation 5 Tap position indication in MDU & Divertor switch 6 No of rotations for one step operation 7 Local operation is not possible when selector s/w in Remote position 8 Over travel in operation is within limits 9 Starting current of motor 10 Running current of motor 11 Phase discrepancy in operation (if separate poles for each phases) 12 Time for one tap changing Normal tap 13 Time for one tap changing run through tap (where applicable) 14 Contacts for all alarm/indication circuits 15 Over load tripping of motor (Setting of MPR) 16 IR value of motor and wiring with 500volts Megger 17 Lighting and heater controls (operation of door switch, thermostat etc.) 18 Setting made for voltage monitoring relay (UV/ OV .. ) 19 OLTC counter operation

    Tested By Witnessed By Witnessed by

    Signature

    Name Organization Consultant DEWA

    DEWA/TP/TCD/IDT/ST/17

    TP / TCD / QP01-A042012 Revision

    18 of 36

  • T P DIVISION TRANSMISSION COMMISSIONING DEPARTMENT SITE TEST REPORT

    CONTRACT NO: NAME OF SUB STATION: Main Contractor Name of Bay:

    Page no: Consultant: Equipment: Inter Distribution Transformer(IDT) Manufacturer SCADA No: Date

    DEWA/TP/132 KV/IDT /1.5.1.1.2.04 Rev.0

    20.0 TAP POSITION INDICATION CHECK:

    Tap Positi

    on MDU

    Input to Transducer

    ()

    Transducer output for

    TPI (mA) at MDU

    Transducer (AVR Panel)

    Output (mA)

    Tap Position at AVR Panel

    Tap Position at SCS

    Tap Position at SCC

    Remarks

    1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19

    Tested By Witnessed By Witnessed by

    Signature

    Name

    Organization Consultant DEWA

    DEWA/TP/TCD/IDT/ST/18

    TP / TCD / QP01-A042012 Revision

    19 of 36

  • T P DIVISION TRANSMISSION COMMISSIONING DEPARTMENT SITE TEST REPORT

    CONTRACT NO: NAME OF SUB STATION: Main Contractor Name of Bay:

    Page no: Consultant: Equipment: Inter Distribution Transformer(IDT) Manufacturer SCADA No: Date

    DEWA/TP/132 KV/IDT /1.5.1.1.2.04 Rev.0

    21.0 INSULATION RESISTANCE CHECK OF DEVICES

    Sl. No. Device/Component

    Details of devices Test voltage

    Ambient Temp.

    Terminal numbers in

    MK

    IR value (M) Serial No Make

    1

    HV bushing test tap (U) (V) (W)

    2 HV-N bushing test tap

    3 Buchholz relay(MT)

    4 Buchholz relay(CB) 5 Oil level gauge (MT) 6 Oil level gauge (OLTC) 7 Rubber bag failure relay

    8 PRD (MT)

    9 PRD (OLTC)

    10 PRD (CB U) 11 PRD (CB V) 12 PRD (CB W) 13 OLTC surge relay

    14 OTI

    12 WTI HV 13 WTI LV

    14 Heater HV cable box

    15 Heater LV cable box

    16 Heater Marsh. Kiosk

    17 Heater MDU

    18 LV cable box supporting insulators

    Tested By Witnessed By Witnessed by

    Signature

    Name Organization Consultant DEWA

    DEWA/TP/TCD/IDT/ST/19

    TP / TCD / QP01-A042012 Revision

    20 of 36

  • T P DIVISION TRANSMISSION COMMISSIONING DEPARTMENT SITE TEST REPORT

    CONTRACT NO: NAME OF SUB STATION: Main Contractor Name of Bay:

    Page no: Consultant: Equipment: Inter Distribution Transformer(IDT) Manufacturer SCADA No: Date

    DEWA/TP/132 KV/IDT /1.5.1.1.2.04 Rev.0

    22.0 FAN MOTOR CHECK

    Make Rating KW/HP

    Type / Model

    Rated current

    FAN NO.

    SERIAL NO.

    CHECK for DIRECTION OF ROTATION

    STARTING CURRENT (A)

    RUNNING CURRENT (Amps)

    U V W

    OV

    ER L

    OA

    D D

    EVIC

    E

    OVER LOAD SETTING (Amps)

    TRIP OPERATION TIME (Sec)

    BLOCKED ROTOR CURRENT (A) (Random test 10% only)

    ALARM CONTACT (OK/Not OK)

    IR VALUE AT 500 V (M ) 48 HR RUNNING TEST (No abnormality during test)

    CHECK FAN RUNNING STARTS WHEN ONE PHASE IS DISCONNECTED RUNNING / NOT RUNNING

    Calibration Details Tested By Witnessed By Witnessed by

    Signature

    Name Organization Consultant DEWA

    DEWA/TP/TCD/IDT/ST/20

    TP / TCD / QP01-A042012 Revision

    21 of 36

  • T P DIVISION TRANSMISSION COMMISSIONING DEPARTMENT SITE TEST REPORT

    CONTRACT NO: NAME OF SUB STATION: Main Contractor Name of Bay:

    Page no: Consultant: Equipment: Inter Distribution Transformer(IDT) Manufacturer SCADA No: Date

    DEWA/TP/132 KV/IDT /1.5.1.1.2.04 Rev.0

    23.0 OPERATION CHECK OF COOLING EQUIPMENTS

    MANUAL OPERATION

    DIRECTION OF FANS / PUMPS

    AUTO CONTROL FROM HV W. T. I AS PER DRAWING FAN START (C) FAN STOP. .(C) ACTUAL OPERATION FAN START (C) FAN STOP. .(C)

    AUTO CONTROL FROM LV W. T. I AS PER DRAWING FAN START (C) FAN STOP. .(C) ACTUAL OPERATION FAN START (C) FAN STOP. .(C)

    AUTO CONTROL FROM O T. I AS PER DRAWING FAN START (C) FAN STOP. .(C) ACTUAL OPERATION FAN START (C) FAN STOP. .(C)

    CHECK INTERLOCKING OF COOLING FANS WITH FPS OPERATION

    UNDER VOLTAGE RELAY OPERATION AND ALARM CONTACT

    MAIN CONTROL MCB TRIP

    FAN CONTROL SWITCH TRIP

    PUMP / FAN ON INDICATION

    PUMP / FAN FAILURE INDICATIONS

    CHECK FOR STAGGERED STARTING OF COOLER FANS/PUMPS

    WIRING CHECKS (T. B NO, FERRULES, GROUPING OF ALARM CONTACTS ETC. AS PER DRAWINGS)

    Tested By Witnessed By Witnessed by

    Signature

    Name

    Organization Consultant DEWA DEWA/TP/TCD/IDT/ST/21

    TP / TCD / QP01-A042012 Revision

    22 of 36

  • T P DIVISION TRANSMISSION COMMISSIONING DEPARTMENT SITE TEST REPORT

    CONTRACT NO: NAME OF SUB STATION: Main Contractor Name of Bay:

    Page no: Consultant: Equipment: Inter Distribution Transformer(IDT) Manufacturer SCADA No: Date

    DEWA/TP/132 KV/IDT /1.5.1.1.2.04 Rev.0

    24. PROTECTIVE DEVICES WIRING/OPERATION CHECK Sl. No.

    Description Initiated from

    Terminal No. in MK

    Terminal /Ferrule No.in LCC

    Remarks/ Results SCS/SCC(To be ensured at the device end)

    1 Buchholz Alarm (MT) ------------ 2 Buchholz Alarm(CB) ------------ 3 Oil temp. high ------------ 4 Wind. Temp. high( HV) ------------ 5 Wind. Temp. high (LV) ------------ 6 Rubber bag fail ------------ 7 Oil level high(MT) ------------ 8 Oil level low (MT) ------------ 9 Oil level high (OLTC) ------------ 10 Oil level low (OLTC) ------------ 11 Cooling system faulty 12 Dissolved gas alarm 13 Heating / Lighting

    supply failure (MK & CB)

    14 Cooling fan running Transformer Trips 1 Buchholz relay (MT) ------------ 2 Buchholz relay (CB) ------------ 3 Surge Relay (OLTC) ------------ 4 Oil temp. high ------------ 5 Wind. Temp. high (HV) ------------ 6 Wind. Temp. high (LV) ------------ 7 PRD (MT) ------------ 8 PRD (OLTC) ------------ 9 PRD (CB U ) ------------ 10 PRD (CB V ) ------------ 11 PRD (CB W ) ------------

    Buchholz Relay alarm contact operation check by N2 injection

    Tested By Witnessed By Witnessed by

    Signature

    Name Organization Consultant DEWA

    DEWA/TP/TCD/IDT/ST/22

    TP / TCD / QP01-A042012 Revision

    23 of 36

  • T P DIVISION TRANSMISSION COMMISSIONING DEPARTMENT SITE TEST REPORT

    CONTRACT NO: NAME OF SUB STATION: Main Contractor Name of Bay:

    Page no: Consultant: Equipment: Inter Distribution Transformer(IDT) Manufacturer SCADA No: Date

    DEWA/TP/132 KV/IDT /1.5.1.1.2.04 Rev.0

    25.0 CABLE BOX INSPECTION Sl.No Check points Verified by 23.1 HV Cable box prior to HV test of cables U V W

    1 Ensure Cleanliness 2 Ensure Earthing of HV and LV terminations 3 Ensure that link is removed &Check test tap cap threads/ tightness 4 Ensure absence of floating parts in cable box 5 Ensure tightness of shield connection 6 Ensure filling of oil 7 Oil test report traceability 8 Ensure the BDV, water content & Tan of filling oil is satisfactory 9 Ensure the BDV, water content of filled oil is satisfactory

    10 Ensure body earthing 23.2 HV Cable box after HV test of cables

    1 Tightness of shield connection 2 Ensure that link is fitted and connections locked as per cable box

    drawing

    3 Ensure proper insulation of link as per drawing 4 Ensure cleanliness 5 Ensure that temporary earth link ( provided for HV test) is removed 6 Ensure absence of floating parts 7 Ensure tightness Terminal connections and shield 8 Value of applied torque for the connection of links( as per

    manufacturers recommendation ------ Nm Bolt Size ---- mm)

    9 Ensure BDV, tan delta & water content of filling oil is satisfactory 10 Ensure the BDV ,water content of filled oil is satisfactory

    23.3 LV Cable box (after cable termination) 1 Ensure plating of LV bus bar 2 Ensure terminal connector tightness 3 Measured LV bus bar connection torque (Torque value -- ------Nm

    Bolt size ------- mm)

    4 Ensure connections are locked after torque checking 5 Ensure that no load is transferred to bushing 6 Ensure min. elect. Clearance as required by drawing. 7 Ensure cable sheath is floating and kept away from earth.

    Tested By Witnessed By Witnessed by

    Signature

    Name Organization Consultant DEWA

    DEWA/TP/TCD/IDT/ST/23

    TP / TCD / QP01-A042012 Revision

    24 of 36

  • T P DIVISION TRANSMISSION COMMISSIONING DEPARTMENT SITE TEST REPORT

    CONTRACT NO: NAME OF SUB STATION: Main Contractor Name of Bay:

    Page no: Consultant: Equipment: Inter Distribution Transformer(IDT) Manufacturer SCADA No: Date

    DEWA/TP/132 KV/IDT /1.5.1.1.2.04 Rev.0

    26.1. CHECK ON AUTOMATIC VOLTAGE REGULATOR (AVR) Details of AVR Make : Sl.No. : Band width % : ( volts) Under voltage

    blocking (%) :

    Over voltage setting (%) : VT sec. voltage : a). SOFTWARE CONFIGURATION DETAILS Firmware version : Background Program Version : b). HARDWARE CONFIGURATION DETAILS i) AVR System Number (If applicable) : ii)Article No/Sl No of AVR components/cards Sl.no. Description of Components / Cards Art. No. / Sl. No. Remarks c). AVAILABILITY OF BACKUP CDs FOR i) Updated background programme (If applicable) : ii) Firmware : d). AVAILABILITY OF MANUAL FOR ALL HARDWARE COMPONENTS / CARDS : e). AVAILABILITY OF SPARE COMMUNICATION CABLES : (For communication b/w PC and AVR system) f). TYPE OF COMMUNICATION PORT : g). ENGRAVED LABELS PROVIDED FOR ALL INDICATIONS AT AVR :

    Tested By Witnessed By Witnessed by

    Signature

    Name

    Organization Consultant DEWA DEWA/TP/TCD/IDT/ST/24

    TP / TCD / QP01-A042012 Revision

    25 of 36

  • T P DIVISION TRANSMISSION COMMISSIONING DEPARTMENT SITE TEST REPORT

    CONTRACT NO: NAME OF SUB STATION: Main Contractor Name of Bay:

    Page no: Consultant: Equipment: Inter Distribution Transformer(IDT) Manufacturer SCADA No: Date

    DEWA/TP/132 KV/IDT /1.5.1.1.2.04 Rev.0

    26.2 Check Points

    Sl.No Status description Check point Result Remarks 25.2.1 Operation

    1.1

    AVR in Auto mode

    No manual operation possible from MDU, SCS, SCC and AVR

    1.2 Auto operations with the variations in PT sec. Voltage. Tap Raise command when PT sec. Voltage reduced and vice versa

    1.3 AVR in manual mode

    Auto operations not possible 1.4 Manual operations possible from AVR

    Manual operations possible from SCS & SCC 1.5

    MDU in local position Operation possible from MDU

    1.6 Operation not possible from AVR & SCC/SCS 1.7 MDU & AVR in remote

    position Operation not possible from MDU&SCC/ SCS

    1.8 Operation possible from AVR 1.9 MDU in remote & AVR in

    Supervisory Operations not possible from MDU & AVR

    1.10 Operation possible from SCC/ SCS only 1.11 Under voltage blocking No operations possible 1.12 Over voltage setting LED indication 1.13 Selection from SCS/SCC Supervisory/ remote selection of AVR 1.14 Selection from SCS/ SCC Auto / Manual selection of AVR

    25.2.2 AVR Display 2.1 Voltage 2.2 Current 2.3 Tap No 2.4 Frequency 2.5 Master/Follower/Independent mode 2.6 Paragramar functions (Breaker status indication)

    Tested By Witnessed By Witnessed by

    Signature

    Name

    Organization Consultant DEWA DEWA/TP/TCD/IDT/ST/25

    TP / TCD / QP01-A042012 Revision

    26 of 36

  • T P DIVISION TRANSMISSION COMMISSIONING DEPARTMENT SITE TEST REPORT

    CONTRACT NO: NAME OF SUB STATION: Main Contractor Name of Bay:

    Page no: Consultant: Equipment: Inter Distribution Transformer(IDT) Manufacturer SCADA No: Date

    DEWA/TP/132 KV/IDT /1.5.1.1.2.04 Rev.0

    27. TAP CHANGER & COOLER ALARMS / INDICATIONS CHECK

    Sl.No. Alarm description Initiated at AVR DCS SCADA Remarks

    27.1. ALARMS

    1 TC out of step 2 TC incomplete 3 TC motor supply faulty 4 TC control supply faulty 5 AVR faulty 6 VT supply faulty

    27.2. INDICATIONS

    1 AVR in Remote 2 AVR in Supervisory 3 AVR in Auto 4 AVR in Manual 5 TC in progress 6 AVR in Independent mode 7 AVR in Master/follower mode 8 TC Extreme tap positions (Raise / Lower) ------- ------- 9 Over Voltage (only at AVR) ----- ------ 10 Under Voltage (only at AVR) ----- ------ 11 AVR healthy Status (only at AVR) ----- ------

    Tested By Witnessed By Witnessed by

    Signature

    Name

    Organization Consultant DEWA DEWA/TP/TCD/IDT/ST/26

    TP / TCD / QP01-A042012 Revision

    27 of 36

  • T P DIVISION TRANSMISSION COMMISSIONING DEPARTMENT SITE TEST REPORT

    CONTRACT NO: NAME OF SUB STATION: Main Contractor Name of Bay:

    Page no: Consultant: Equipment: Inter Distribution Transformer(IDT) Manufacturer SCADA No: Date

    DEWA/TP/132 KV/IDT /1.5.1.1.2.04 Rev.0

    28. TAP CHANGER PARALLEL OPERATION CHECKS 28.1 PARALLEL MANUAL MODE

    Sl.No.

    MASTER/ FOLLOWER/ INDEPENDENT SWITCH SELECTIONS

    OLTC OPERATION RESULT / REMARKS

    Operated from

    MDU AVR TR 1 TR

    2 TR

    3 TR 1 TR 2 TR 3 AVR panel SCS SCC

    1 R H R/S* M F F OPERATE AS MASTER

    OPERATE AS FOLLOWER

    OPERATE AS FOLLOWER

    2 R H R/S* F M F OPERATE AS FOLLOWER

    OPERATE AS MASTER

    OPERATE AS FOLLOWER

    3 R H R/S* F F M OPERATE AS FOLLOWER

    OPERATE AS FOLLOWER

    OPERATE AS MASTER

    4 R H R/S* M F I OPERATE AS MASTER

    OPERATE AS FOLLOWER

    OPERATE AS INDEPENDENT

    5 R H R/S* M I F OPERATE AS MASTER

    OPERATE AS INDEPENDENT

    OPERATE AS FOLLOWER

    6 R H R/S* I M F OPERATE AS INDEPENDENT

    OPERATE AS MASTER

    OPERATE AS FOLLOWER

    7 R H R/S* M M M OPERATION SHALL BE NOT POSSIBLE OR OPERATE AS MFF MODE

    8 R H R/S* F F F OPERATION SHALL BE NOT POSSIBLE OR OPERATE AS INDEPENDED MODE

    9 R H R/S* I I I OPERATE AS INDEPENDENT

    OPERATE AS INDEPENDENT

    OPERATE AS INDEPENDENT

    10 R H R/S* M I I OPERATE AS INDEPENDENT

    OPERATE AS INDEPENDENT

    OPERATE AS INDEPENDENT

    11 R H R/S* I M I OPERATE AS INDEPENDENT

    OPERATE AS INDEPENDENT

    OPERATE AS INDEPENDENT

    12 R H R/S* I I M OPERATE AS INDEPENDENT

    OPERATE AS INDEPENDENT

    OPERATE AS INDEPENDENT

    M Master F Follower I Independent. S*-- Supervisory for SCS & SCC R Remote A Auto H Hand (manual)

    Tested By Witnessed By Witnessed by

    Signature

    Name

    Organization Consultant DEWA DEWA/TP/TCD/IDT/ST/27

    TP / TCD / QP01-A042012 Revision

    28 of 36

  • T P DIVISION TRANSMISSION COMMISSIONING DEPARTMENT SITE TEST REPORT CONTRACT NO: NAME OF SUB STATION: Main Contractor Name of Bay:

    Page no: Consultant: Equipment: Inter Distribution Transformer(IDT) Manufacturer SCADA No: Date

    DEWA/TP/132 KV/IDT /1.5.1.1.2.04 Rev.0

    28.2 PARALLEL AUTO MODE Check for Breaker status indications before test *AVR (REMOTE Supervisory)

    Sl.No SELECTIONS SWITCH GEAR STATUS Mode of AVR (Automatic change over) OPERATES AS

    OPERATION CHECKED FROM REMARKS

    MDU AVR HV BREAKERS LV INCOMER / BUS SECTION AVR1 AVR2 AVR3 IDT IDT2 IDT3 AVR DCS SCADA IDT1 IDT2 IDT3 IDT1 BS1 IDT2 BS2 IDT3 1 R H R* C C C C C C C C M F F M F F 2 R H R* C C C C C C O C M F I M F I

    3 R H R* C C C C C C C O M F I M F I

    4 R H R* C C C C C O C C M I F M I F 5 R H R* C C C O C C C C I M F I M F 6 R H R* C C C C O C C C I M F I M F 7 R H R* O C C C C C C C I M F I M F8 R H R* C O C C C C C C M I F M I F9 R H R* C C O C C C C C M F I M F I

    10 R H R* O O C C C C C C I I I I I I 11 R H R* C C C O C O C C I I I I I I

    12 R H R* C C C C O O C C I I I I I I

    13 R H R* C C C C O C O C I I I I I I14 R H R* C C C C C O O C I I I I I I

    C.AUTO OPERATION CHECK USING AVR Repeat the above operations in AVR Auto mode (changing AVR selection as Auto instead of H) and by varying the PT secondary voltages. Result/Remarks Remote H Hand (Manual) M Master F Follower I Independent C Close O Open

    TP / TCD / QP01-A042012 Revision

    29 of 36

  • T P DIVISION TRANSMISSION COMMISSIONING DEPARTMENT SITE TEST REPORT

    CONTRACT NO: NAME OF SUB STATION: Main Contractor Name of Bay:

    Page no: Consultant: Equipment: Inter Distribution Transformer(IDT) Manufacturer SCADA No: Date

    DEWA/TP/132 KV/IDT /1.5.1.1.2.04 Rev.0

    29.0 OIL LEAK TEST Hourly Reading/ details:

    Date Time Ambient Temp. ( C)

    Tr. OTI reading

    (C) Pressure

    at Top (Bar)

    Pressure at Transformer Bottom (Bar)

    Result /

    observation Remarks

    ----- Before the application of Pressure PRD locking shall be released after completion of pressure test :

    Calibration Details Tested By Witnessed By Witnessed by

    Signature

    Name Organization Consultant DEWA

    DEWA/TP/TCD/IDT/ST/29

    TP / TCD / QP01-A042012 Revision

    30 of 36

  • T P DIVISION TRANSMISSION COMMISSIONING DEPARTMENT SITE TEST REPORT

    CONTRACT NO: NAME OF SUB STATION: Main Contractor Name of Bay:

    Page no: Consultant: Equipment: Inter Distribution Transformer(IDT) Manufacturer SCADA No: Date

    DEWA/TP/132 KV/IDT /1.5.1.1.2.04 Rev.0

    30.0 BDV TEST ON INSULATING OIL

    Sl.No Test no BDV of Main tank oil BDV of OLTC oil

    1 Test no: 1 2 Test no: 2 3 Test no: 3 4 Test no: 4 5 Test no: 5 6 Test no: 6

    Average

    BDV of Cable box oil Before HV test After HV test

    U V W U V W 1 Test no: 1 2 Test no: 2 3 Test no: 3 4 Test no: 4 5 Test no: 5 6 Test no: 6

    Average

    Sampling done from:

    1 Test no: 1 2 Test no: 2 3 Test no: 3 4 Test no: 4 5 Test no: 5 6 Test no: 6

    Average

    Prepared By Verified by Verified by

    Signature

    Name

    Organization Consultant DEWA DEWA/TP/TCD/IDT/ST/30

    TP / TCD / QP01-A042012 Revision

    31 of 36

  • T P DIVISION TRANSMISSION COMMISSIONING DEPARTMENT SITE TEST REPORT

    CONTRACT NO: NAME OF SUB STATION: Main Contractor Name of Bay:

    Page no: Consultant: Equipment: Inter Distribution Transformer(IDT) Manufacturer SCADA No: Date

    DEWA/TP/132 KV/IDT /1.5.1.1.2.04 Rev.0

    31.0 TEST RESULTS / PROPERTIES OF INSULATING OIL BEFORE FILLING

    Type of oil : Make: Country of origin: Property Unit Requirement Test Results Remarks

    Kinematic viscosity at a) 400C b) -300C

    mm2 / S 12 1 800

    Flash Point 0C 140 Pour Point 0C - 40 Dissipation factor @ 900C [40 ~ 60Hz] ----------- 0.005 Appearance

    ------------ Clear free from sediment and

    suspended matter

    Density at 200C g/ml 0.895 Interfacial tension at 250C mN/m 40 Neutralization Value mg KOH/gm 0.01 Corrosive Sulphur --------- Non corrosive Total Sulphur content % < 0.15

    Water Content mg/kg < 30

    Antioxidant additives DBPC

    %

    0.08- 0.4

    Oxidation stability a) Total acidity b) Sludge c) Dissipation factor @ 900C d) Total sulphur content

    mgKOH/gm

    %

    %

    0.3 0.05 0.050 0.15

    Breakdown Voltage (Treated/ delivered) kV 70/ 30 2- Furfural content mg/kg 0.1 PCA content % < 3 PCB content Not detectable DBDS (IEC 62535)

    (Copy of Test certificate from oil manufacturer is attached)

    Prepared By Verified by Verified by

    Signature

    Name Organization Consultant DEWA

    DEWA/TP/TCD/IDT/ST/31

    TP / TCD / QP01-A042012 Revision

    32 of 36

  • T P DIVISION TRANSMISSION COMMISSIONING DEPARTMENT SITE TEST REPORT

    CONTRACT NO: NAME OF SUB STATION: Main Contractor Name of Bay:

    Page no: Consultant: Equipment: Inter Distribution Transformer(IDT) Manufacturer SCADA No: Date

    DEWA/TP/132 KV/IDT /1.5.1.1.2.04 Rev.0

    32.0 TEST ON TRANSFORMER OIL AFTER COMPLETE SITE PROCESSING Type of oil: Make: Country of origin:

    Sl. No. Property Unit Requirement as per Spec.

    Test Result

    Remarks

    1 Color Number 2 (max) 2 Appearance --------- Clean, free

    from sediment and suspended matter

    3 Breakdown Voltage OLTC

    kV 70

    Main tank

    4 Water Content OLTC

    mg/kg < 10

    Main tank 5 Dissipation Factor at 900C. --------- 0.015 6 Resistivity at 900C. Gm 60 7 Neutralization Value mgKOH/gm 0.03 8 Interfacial Tension mN/m 35 9 Oxidation Stability (Test

    duration 500h) Total acidity Sludge DDF @ 90C Total sulphur content

    mgKOH/gm

    % --- %

    0.3 0.05 0.05 0.15

    10 Antioxidant additives DBPC % 0.08- 0.4 11 Flash Point 0C 140 12 Total PCB content mg/kg

  • T P DIVISION TRANSMISSION COMMISSIONING DEPARTMENT SITE TEST REPORT

    CONTRACT NO: NAME OF SUB STATION: Main Contractor Name of Bay:

    Page no: Consultant: Equipment: Inter Distribution Transformer(IDT) Manufacturer SCADA No: Date

    DEWA/TP/132 KV/IDT /1.5.1.1.2.04 Rev.0

    33.0 DGA TEST ON TRANSFORMER OIL Date of Sampling : Oil Temperature :

    Sampled by : Sampling Point :

    Sample identification :

    Tests carried out by :

    Test report reference :

    Test Results

    Sl.No. Dissolved gas Concentration (ppm) Remarks

    1 Hydrogen (H2)

    2 Methane (CH4)

    3 Ethane (C2H6)

    4 Ethylene (C2H4)

    5 Acetylene (C2H2)

    6 Carbon Monoxide (CO)

    7 Carbon Dioxide (CO2)

    8 Oxygen (O2)

    9 Nitrogen (N2)

    10 TDCG (ppm / %)

    11 CO2 / CO

    Prepared By Verified by Verified by

    Signature

    Name

    Organization Consultant DEWA DEWA/TP/TCD/IDT/ST/33

    TP / TCD / QP01-A042012 Revision

    34 of 36

  • T P DIVISION TRANSMISSION COMMISSIONING DEPARTMENT SITE TEST REPORT

    CONTRACT NO: NAME OF SUB STATION: Main Contractor Name of Bay:

    Page no: Consultant: Equipment: Inter Distribution Transformer(IDT) Manufacturer SCADA No: Date

    DEWA/TP/132 KV/IDT /1.5.1.1.2.04 Rev.0

    34.0 CHECK ON SMALL WIRING No Check points Requirement Result

    1 Alarm/ Trip terminals a) Disconnection b) Identification Alarm Trip c) Termination d) Looping

    Facility shall be available Ferrule shall have Alarm or L marking Red ferrule with Trip or T in white shall be provided Stranded wires shall be with crimped terminals. Looping shall be through shorting link

    2 CT terminals Shall be with shorting link 3 Plug socket Shall be wired 4 Contact operation check

    Door switch of MK Heaters Thermostat (set @.) Hygrostat (set @.)

    Performance shall be satisfactory

    35.0 CHECK DURING FIRE DELUGE OPERATION

    No Check point Requirement 1 Condition of fan Running fan shall trip on deluge operation 2. Entry of water in closed cabinets of

    (LV cable box, MK, MDU) & terminal boxes of MOLG, CTs, Fans, PRDs, protective relays & all other device terminal boxes) Ensure that the cabinets are closed and tightened prior to deluge operation)

    Shall be watertight.

    3 Drainage inside transformer room Drainage system should be satisfactory

    Tested By Witnessed By Witnessed by

    Signature

    Name Organization Consultant DEWA

    DEWA/TP/TCD/IDT/ST/34

    TP / TCD / QP01-A042012 Revision

    35 of 36

  • T P DIVISION TRANSMISSION COMMISSIONING DEPARTMENT SITE TEST REPORT

    CONTRACT NO: NAME OF SUB STATION: Main Contractor Name of Bay:

    Page no: Consultant: Equipment: Inter Distribution Transformer(IDT) Manufacturer SCADA No: Date

    DEWA/TP/132 KV/IDT /1.5.1.1.2.04 Rev.0

    36.0 FREQUENCY RESPONSE ANALYSIS (FRA) Test shall be done in the following conditions. A. With neutral earthed (through the test equipment) and LV open

    1. Applied on HV U phase 2. Applied on HV V phase 3. Applied on HV W phase

    B. With neutral earthed (through the test equipment) and LV short circuited 1. Applied on HV U phase 2. Applied on HV V phase 3. Applied on HV W phase

    C. With HV open

    1. Applied on LV U phase 2. Applied on LV V phase 3. Applied on LV W phase

    (Attach the FRA plots to this sheet)

    Calibration Details Tested By Witnessed By Witnessed by

    Signature

    Name

    Organization Consultant DEWA DEWA/TP/TCD/IDT/ST/35

    TP / TCD / QP01-A042012 Revision