3/5.7 Annex A to - REVIEW OF ENVIRONMENTAL FACTORS (REF) ASSOCIATED WITH THE SOUTH BOWENFEL’S SEWERAGE SCHEME . Short Title - REF MATRIX The description of the existing environment is presented in the form of a matrix where the basic reference document is: 1. drawing 1102133-31 & 32 (prepared by NSW PWD) for the South Bowenfels rising main and gravity main, 2. drawing 1102133-61, 62, 63 & 64 (prepared by NSW PWD) for the South Littleton rising main and gravity main, 3. table 3 (included below this page) a detailed description of the (four components of the development) proposal, 4. table 4 & 5 (included below page 2) a description of the existing environment and the likely impact of the development on the that environment, and finally 5. table 6 (included below page 3) shows the steps that will be taken to protect that environment including sedimentation control. This development will impact on the amenity of others at times during the construction period to the extent that noise and dust may be generated but overshadowing and traffic generation is not anticipated. The length of the development is just under 4-kM so reference to any property along this route is best made by reference to the distance (chainages) shown on the drawings mentioned above. The origin of chainage is at the relevant pump station South Bowenfels or South Littleton. The covering matrix the REF MATRIX attempts to show the correlation between properties affected by the works at any chainage (see column 0 Pipeline Chainage. Column 1 Property Details. & Column 2 Ownership Details.) table 3, table 4 & 5 and table 6 below. Table 3 Detailed Description of the Proposal Proposal or Separable Portion Number 3.1 Separable Portion 1 3.2 Separable Portion 2 3.3 Separable Portion 3 3.4 Separable Portion 4 Separable Portion Description Rising Mains & Gravity Mains The road, rail & creeks crossing South Bowenfels pump station & storm water pipe South Littleton’s pump station Details of the Separable Portion 3.1. The proposal is to: clear the line, excavate, lay, backfill, compact and reinstate - after installation of a shallow 250 to 355- NB pipeline 3.2. The proposal is to: under bore, jack or pull a 250 to 355-NB pipe though the under bore and connect to the adjoining shallow 300-NB pipeline positioned there by Separable Portion 1 3.3A. The Pump Station proposal is to build a 3-m diameter underground sewage pump station in the existing easement together with the associated connecting gravity and pressure pipes 3.3B The Storm Water proposal is to install 130-m of 900-mm diameter storm water pipe from the existing headwall - across private land, to discharge into land zoned open space, in private ownership. 3.4. The Pump Station proposal is to build: a 3-m diameter underground sewage pump station; and an emergency storage - in the existing easement together with the associated connecting gravity and pressure pipes

Annex A to - REVIEW OF ENVIRONMENTAL FACTORS ...archive.lithgow.nsw.gov.au/documents/REF.Annex.A.To...t:\a operations\bob salmon\letter drop\ref annex a to south bowenfels sewerage

  • Upload
    others

  • View
    5

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Annex A to - REVIEW OF ENVIRONMENTAL FACTORS ...archive.lithgow.nsw.gov.au/documents/REF.Annex.A.To...t:\a operations\bob salmon\letter drop\ref annex a to south bowenfels sewerage

3/5.7

Annex A to - REVIEW OF ENVIRONMENTAL FACTORS (REF) ASSOCIATED WITH THE SOUTH BOWENFEL’S SEWERAGE SCHEME.

Short Title - REF MATRIX

The description of the existing environment is presented in the form of a matrix where the basic reference document is:

1. drawing 1102133-31 & 32 (prepared by NSW PWD) – for the South Bowenfels rising main and gravity main,

2. drawing 1102133-61, 62, 63 & 64 (prepared by NSW PWD) – for the South Littleton rising main and gravity main,

3. table 3 (included below this page) – a detailed description of the (four components of the development) proposal,

4. table 4 & 5 (included below page 2) – a description of the existing environment and the likely impact of the development on the that environment, and finally

5. table 6 (included below page 3) – shows the steps that will be taken to protect that environment including sedimentation control.

This development will impact on the amenity of others at times during the construction period to the extent that noise and dust may be generated but overshadowing and traffic generation is not anticipated.

The length of the development is just under 4-kM so reference to any property along this route is best made by reference to the distance (chainages) shown on the drawings mentioned above. The origin of chainage is at the relevant pump station – South Bowenfels or South Littleton.

The covering matrix – the REF MATRIX – attempts to show the correlation between properties affected by the works at any chainage (see column 0 Pipeline Chainage. Column 1 Property Details. & Column 2 Ownership Details.) table 3, table 4 & 5 and table 6 below.

Table 3 Detailed Description of the Proposal

Proposal or Separable Portion Number

3.1 Separable Portion 1

3.2 Separable Portion 2

3.3 Separable Portion 3

3.4 Separable Portion 4

Separable Portion Description

Rising Mains & Gravity Mains

The road, rail & creeks crossing

South Bowenfels pump station & storm water pipe

South Littleton’s pump station

Details of the Separable Portion

3.1. The proposal is to: clear the line, excavate, lay, backfill, compact and reinstate - after installation of a shallow 250 to 355-NB pipeline

3.2. The proposal is to: under bore, jack or pull a 250 to 355-NB pipe though the under bore and connect to the adjoining shallow 300-NB pipeline positioned there by Separable Portion 1

3.3A. The Pump Station proposal is to build a 3-m diameter underground sewage pump station in the existing easement together with the associated connecting gravity and pressure pipes

3.3B The Storm Water proposal is to install 130-m of 900-mm diameter storm water pipe from the existing headwall - across private land, to discharge into land zoned open space, in private ownership.

3.4. The Pump Station proposal is to build: a 3-m diameter underground sewage pump station; and an emergency storage - in the existing easement together with the associated connecting gravity and pressure pipes

Page 2: Annex A to - REVIEW OF ENVIRONMENTAL FACTORS ...archive.lithgow.nsw.gov.au/documents/REF.Annex.A.To...t:\a operations\bob salmon\letter drop\ref annex a to south bowenfels sewerage

3/5.7

Annex A to - South Bowenfel’s Sewerage Scheme Upgrade – By Review of Environmental Factors (REF) For The Project Manager The Determining Authority

t:\a operations\bob salmon\letter drop\ref annex a to south bowenfels sewerage schemsupgrade1 sans ownership details.docx Page 2 of 38 pages 21-Aug-13

Table 4 & 5 Description of the Existing Environment & the Likely Impact of the Work Activity on the Environment

Description of the Existing Environment

Impact of the Work Activity on the Environment: (a) During construction, (b) on progress payment (c) 12 months after construction

4A Grass land with some services 5(a) Open excavation, stock piles, orange mesh/para- fencing.

5(b) Fully reinstated and seeded.

5(c) Regrowth re-established to 90-95%.

4B1 Great Western Highway - road reserve with services and obstructing trees

5(a) Trees will be removed and replaced with semi mature stock. The trench will be open excavated, stock piles created and orange mesh/para-fencing placed.

5(b) Fully reinstated and seeded.

5(c) Regrowth re-established to 90-95%.

4B2 Great Western Highway - road reserve with services but NO obstructing trees

5(a) Open excavation, stock piles, orange mesh/para- fencing.

5(b) Fully reinstated and seeded.

5(c) Regrowth re-established to 90-95%.

4C1 Town road reserve – footpath with services & obstructing trees

5(a) Trees will be removed and replaced with semi mature stock. The trench will be open excavated, stock piles created and orange mesh/para-fencing placed.

5(b) Fully reinstated and seeded.

5(c) Regrowth re-established to 90-95%.

4C2 Town Road Reserve – footpath with services but NO obstructing trees

5(a) Open excavation, stock piles, orange mesh/para- fencing.

5(b) Fully reinstated and seeded.

5(c) Regrowth re-established to 90-95%.

5(e) No discernible impact expected.

Page 3: Annex A to - REVIEW OF ENVIRONMENTAL FACTORS ...archive.lithgow.nsw.gov.au/documents/REF.Annex.A.To...t:\a operations\bob salmon\letter drop\ref annex a to south bowenfels sewerage

3/5.7

Annex A to - South Bowenfel’s Sewerage Scheme Upgrade – By Review of Environmental Factors (REF) For The Project Manager The Determining Authority

t:\a operations\bob salmon\letter drop\ref annex a to south bowenfels sewerage schemsupgrade1 sans ownership details.docx Page 3 of 38 pages 21-Aug-13

Table 6 Steps to be Taken to Protect the Environment including Sedimentation Control

Steps Mitigating actions

6.1 Sediment and Erosion Control

Take all steps necessary to protect the environment and in particular, comply with the requirements of this Section.

Comply with the relevant requirements of the following publications:- (i) Urban Erosion and Sediment Control Handbook (Department of Conservation and

Land Management);

(ii) Urban Erosion and Sediment Control Field Guide (Department of Land and Water Conservation);

Adopt such measures as may be necessary for erosion, contamination and sediment control, during construction, including the following, where applicable:-

(i) minimal vegetation and soil disturbance – restricted to the areas required for

construction and access;

(ii) progressive restoration of disturbed areas;

(iii) temporary drains;

(iv) temporary geotextile sediment fence and straw bales;

(v) spreader banks or other structures to disperse concentrated runoff;

(vi) construction and maintenance of silt traps to prevent the discharge of scoured

materials to downstream areas;

(vii) stockpiling waste materials away from waterways and barricaded by heavy bales or

silt curtains to prevent sediment movements.

Remove all temporary works when no longer required.

6.2 Under bore the obstructing facility

Bob Salmon, Project Engineer

Applicant’s Signature:

Date: 21-Aug-13

Page 4: Annex A to - REVIEW OF ENVIRONMENTAL FACTORS ...archive.lithgow.nsw.gov.au/documents/REF.Annex.A.To...t:\a operations\bob salmon\letter drop\ref annex a to south bowenfels sewerage

3/5.7

Annex A to South Bowenfel’s Sewerage Scheme Upgrade – Review of Environmental Factors (REF) By South Bowenfel’s SPS to South Littleton’s SPS For

The Project Manager The Determining Authority

t:\a operations\bob salmon\letter drop\ref annex a to south bowenfels sewerage schemsupgrade1 sans ownership details.docx

Page 4 of 38 pages 21-Aug-13

The REF MATRIX –

Refer to drawing 1102133-31 & 32

0. Pipeline Chainage (From pump station)

1. Property Details (Lot no & DP)

2. Ownership Details (Address)

3. Detailed Description of the Work Activity (See table 3 below)

4. Description of the existing environment 5. The likely Impact of the Work Activity on the Environment(See table 4 & 5 below)

6. The Existing Conditions – circa Mid to Late January 2013

-30 to 2 Lot 401 DP 1,086,154

1. 3.3A The Pump Station proposal is to build a 3-m diameter underground sewage pump station in the existing easement together with the associated connecting gravity and pressure pipes

.3B The Storm Water proposal is to install 130-m of 900-mm diameter storm water pipe from the existing headwall - across private land, to discharge into land zoned open space, in private ownership.

4A Grass land with some services.

5. (a) Open excavation, stock piles, orange mesh/para- fencing

(b) Fully reinstated and seeded

(c) Regrowth re-established to 90-95%

6.1

Page 5: Annex A to - REVIEW OF ENVIRONMENTAL FACTORS ...archive.lithgow.nsw.gov.au/documents/REF.Annex.A.To...t:\a operations\bob salmon\letter drop\ref annex a to south bowenfels sewerage

3/5.7

Annex A to South Bowenfel’s Sewerage Scheme Upgrade – Review of Environmental Factors (REF) By South Bowenfel’s SPS to South Littleton’s SPS For

The Project Manager The Determining Authority

t:\a operations\bob salmon\letter drop\ref annex a to south bowenfels sewerage schemsupgrade1 sans ownership details.docx

Page 5 of 38 pages 21-Aug-13

Refer to drawing 1102133-31 & 32

0. Pipeline Chainage (From pump station)

1. Property Details (Lot no & DP)

2. Ownership Details (Address)

3. Detailed Description of the Work Activity (See table 3 below)

4. Description of the existing environment 5. The likely Impact of the Work Activity on the Environment(See table 4 & 5 below)

6. The Existing Conditions – circa Mid to Late January 2013

2 to 100 Lot 1, section 1, DP 3096

2 The proposal is to: clear the line, excavate, lay, backfill, compact and reinstate after installation - a shallow 250 to 355-NB pipeline

4. Existing road surface.

5. (a) Open excavation, stock pipes, orange/para-fencing

(b) Fully reinstated and compacted

(c) Fully reinstated and compacted

6.1

100 to 180 south

Lot 1, DP 602,263

3 The proposal is to: clear the line, excavate, lay, backfill, compact and reinstate after installation - a shallow 250 to 355-NB pipeline

4A. Grass land with some services.

5. (a) Open excavation, stock piles, orange mesh/para- fencing

(b) Fully reinstated and seeded

(c) Regrowth re-established to 90-95%

6.1

Page 6: Annex A to - REVIEW OF ENVIRONMENTAL FACTORS ...archive.lithgow.nsw.gov.au/documents/REF.Annex.A.To...t:\a operations\bob salmon\letter drop\ref annex a to south bowenfels sewerage

3/5.7

Annex A to South Bowenfel’s Sewerage Scheme Upgrade – Review of Environmental Factors (REF) By South Bowenfel’s SPS to South Littleton’s SPS For

The Project Manager The Determining Authority

t:\a operations\bob salmon\letter drop\ref annex a to south bowenfels sewerage schemsupgrade1 sans ownership details.docx

Page 6 of 38 pages 21-Aug-13

Refer to drawing 1102133-31 & 32

0. Pipeline Chainage (From pump station)

1. Property Details (Lot no & DP)

2. Ownership Details (Address)

3. Detailed Description of the Work Activity (See table 3 below)

4. Description of the existing environment 5. The likely Impact of the Work Activity on the Environment(See table 4 & 5 below)

6. The Existing Conditions – circa Mid to Late January 2013

100 to 320 north

Lot 50, DP 1,107,410

4 The proposal is to: clear the line, excavate, lay, backfill, compact and reinstate after installation - a shallow 250 to 355-NB pipeline

4A Grass land with some services.

5. (a) Open excavation, stock piles, orange mesh/para- fencing

(b) Fully reinstated and seeded

(c) Regrowth re-established to 90-95% 6.1

180 to 320 Lot 12, DP 3096

5 The proposal is to: clear the line, excavate, lay, backfill, compact and reinstate after installation - a shallow 250 to 355-NB pipeline

4A Grass land with some services.

5. (a) Open excavation, stock piles, orange mesh/para- fencing

(b) Fully reinstated and seeded

(c) Regrowth re-established to 90-95% 6.1

Page 7: Annex A to - REVIEW OF ENVIRONMENTAL FACTORS ...archive.lithgow.nsw.gov.au/documents/REF.Annex.A.To...t:\a operations\bob salmon\letter drop\ref annex a to south bowenfels sewerage

3/5.7

Annex A to South Bowenfel’s Sewerage Scheme Upgrade – Review of Environmental Factors (REF) By South Bowenfel’s SPS to South Littleton’s SPS For

The Project Manager The Determining Authority

t:\a operations\bob salmon\letter drop\ref annex a to south bowenfels sewerage schemsupgrade1 sans ownership details.docx

Page 7 of 38 pages 21-Aug-13

Refer to drawing 1102133-31 & 32

0. Pipeline Chainage (From pump station)

1. Property Details (Lot no & DP)

2. Ownership Details (Address)

3. Detailed Description of the Work Activity (See table 3 below)

4. Description of the existing environment 5. The likely Impact of the Work Activity on the Environment(See table 4 & 5 below)

6. The Existing Conditions – circa Mid to Late January 2013

320 to 516 Lot 50, DP 1,107,410

6 The proposal is to: clear the line, excavate, lay, backfill, compact and reinstate after installation - a shallow 250 to 355-NB pipeline

4B2 Great Western Highway - road reserve with services but no obstructing trees.

5. (a) Open excavation, stock piles, orange mesh/para- fencing

(b) Fully reinstated and seeded

(c) Regrowth re-established to 90-95%

6.1

516 to 591 Lot 42, DP 1,016,208

7 The proposal is to: clear the line, excavate, lay, backfill, compact and reinstate after installation - a shallow 250 to 355-NB pipeline

4B2 Great Western Highway - road reserve with services but no obstructing trees.

5. (a) Open excavation, stock piles, orange mesh/para- fencing

(b) Fully reinstated and seeded

(c) Regrowth re-established to 90-95%

6.1

Page 8: Annex A to - REVIEW OF ENVIRONMENTAL FACTORS ...archive.lithgow.nsw.gov.au/documents/REF.Annex.A.To...t:\a operations\bob salmon\letter drop\ref annex a to south bowenfels sewerage

3/5.7

Annex A to South Bowenfel’s Sewerage Scheme Upgrade – Review of Environmental Factors (REF) By South Bowenfel’s SPS to South Littleton’s SPS For

The Project Manager The Determining Authority

t:\a operations\bob salmon\letter drop\ref annex a to south bowenfels sewerage schemsupgrade1 sans ownership details.docx

Page 8 of 38 pages 21-Aug-13

Refer to drawing 1102133-31 & 32

0. Pipeline Chainage (From pump station)

1. Property Details (Lot no & DP)

2. Ownership Details (Address)

3. Detailed Description of the Work Activity (See table 3 below)

4. Description of the existing environment 5. The likely Impact of the Work Activity on the Environment(See table 4 & 5 below)

6. The Existing Conditions – circa Mid to Late January 2013

591 to 616 Great Western Highway

8 The proposal is to: under bore, jack or pull a 250 to 355-NB pipe though the under bore and connect to the adjoining shallow 300-NB pipeline positioned there by Separable Portion 1

4B2 Great Western Highway - road reserve with services but no obstructing trees.

5. (a) Open excavation, stock piles, orange mesh/para- fencing

(b) Fully reinstated and seeded

(c) Regrowth re-established to 90-95%

6.

1

616 to 670 Great Western Highway

9 The proposal is to: clear the line, excavate, lay, backfill, compact and reinstate after installation - a shallow 250 to 355-NB pipeline; and to under bore, jack or pull a 250 to 355-NB pipe though the under bore and connect to the adjoining shallow 250 to 355-NB pipeline pre-positioned there.

4B2 Great Western Highway - road reserve with services but no obstructing trees.

5. (a) Open excavation, stock piles, orange mesh/para- fencing

(b) Fully reinstated and seeded

(c) Regrowth re-established to 90-95%

6.1

Page 9: Annex A to - REVIEW OF ENVIRONMENTAL FACTORS ...archive.lithgow.nsw.gov.au/documents/REF.Annex.A.To...t:\a operations\bob salmon\letter drop\ref annex a to south bowenfels sewerage

3/5.7

Annex A to South Bowenfel’s Sewerage Scheme Upgrade – Review of Environmental Factors (REF) By South Bowenfel’s SPS to South Littleton’s SPS For

The Project Manager The Determining Authority

t:\a operations\bob salmon\letter drop\ref annex a to south bowenfels sewerage schemsupgrade1 sans ownership details.docx

Page 9 of 38 pages 21-Aug-13

Refer to drawing 1102133-31 & 32

0. Pipeline Chainage (From pump station)

1. Property Details (Lot no & DP)

2. Ownership Details (Address)

3. Detailed Description of the Work Activity (See table 3 below)

4. Description of the existing environment 5. The likely Impact of the Work Activity on the Environment(See table 4 & 5 below)

6. The Existing Conditions – circa Mid to Late January 2013

617 to 649 Lot 202, DP 1,077,344

10 The proposal is to: clear the line, excavate, lay, backfill, compact and reinstate after installation - a shallow 250 to 355-NB pipeline; and to under bore, jack or pull a 250 to 355-NB pipe though the under bore and connect to the adjoining shallow 250 to 355-NB pipeline pre-positioned there.

4B2 Great Western Highway - road reserve with services but no obstructing trees.

5. (a) Open excavation, stock piles, orange mesh/para- fencing

(b) Fully reinstated and seeded

(c) Regrowth re-established to 90-95%

6.1

649 to 670 Lot 31, DP 1,011,220

11 The proposal is to: clear the line, excavate, lay, backfill, compact and reinstate after installation - a shallow 250 to 355-NB pipeline; and to under bore, jack or pull a 250 to 355-NB pipe though the under bore and connect to the adjoining shallow 250 to 355-NB pipeline pre-positioned there.

4B1 Great Western Highway - road reserve with services and obstructing trees.

5. (a) Trees will be removed and replaced with semi mature stock. The trench will be open excavated, stock piles created and orange mesh/para- fencing installed.

(b) Fully reinstated and seeded

(c) Regrowth re-established to 90-95%

6.1

Page 10: Annex A to - REVIEW OF ENVIRONMENTAL FACTORS ...archive.lithgow.nsw.gov.au/documents/REF.Annex.A.To...t:\a operations\bob salmon\letter drop\ref annex a to south bowenfels sewerage

3/5.7

Annex A to South Bowenfel’s Sewerage Scheme Upgrade – Review of Environmental Factors (REF) By South Bowenfel’s SPS to South Littleton’s SPS For

The Project Manager The Determining Authority

t:\a operations\bob salmon\letter drop\ref annex a to south bowenfels sewerage schemsupgrade1 sans ownership details.docx

Page 10 of 38 pages 21-Aug-13

Refer to drawing 1102133-31 & 32

0. Pipeline Chainage (From pump station)

1. Property Details (Lot no & DP)

2. Ownership Details (Address)

3. Detailed Description of the Work Activity (See table 3 below)

4. Description of the existing environment 5. The likely Impact of the Work Activity on the Environment(See table 4 & 5 below)

6. The Existing Conditions – circa Mid to Late January 2013

670 to 690 Lot 30, DP 1,011,220

12 The proposal is to: clear the line, excavate, lay, backfill, compact and reinstate after installation - a shallow 250 to 355-NB pipeline; and to under bore, jack or pull a 250 to 355-NB pipe though the under bore and connect to the adjoining shallow 250 to 355-NB pipeline pre-positioned there.

4B1 Great Western Highway - road reserve with services and obstructing trees.

5. (a) Trees will be removed and replaced with semi mature stock. The trench will be open excavated, stock piles created and orange mesh/para- fencing installed.

(b) Fully reinstated and seeded

(c) Regrowth re-established to 90-95%

6.1

690 to 710 Lot 1, DP 239,308

13

The proposal is to: clear the line, excavate, lay, backfill, compact and reinstate after installation - a shallow 250 to 355-NB pipeline; and to under bore, jack or pull a 250 to 355-NB pipe though the under bore and connect to the adjoining shallow 250 to 355-NB pipeline pre-positioned there.

4B1 Great Western Highway - road reserve with services and obstructing trees.

5. (a) Trees will be removed and replaced with semi mature stock. The trench will be open excavated, stock piles created and orange mesh/para- fencing installed.

(b) Fully reinstated and seeded 6.1

Page 11: Annex A to - REVIEW OF ENVIRONMENTAL FACTORS ...archive.lithgow.nsw.gov.au/documents/REF.Annex.A.To...t:\a operations\bob salmon\letter drop\ref annex a to south bowenfels sewerage

3/5.7

Annex A to South Bowenfel’s Sewerage Scheme Upgrade – Review of Environmental Factors (REF) By South Bowenfel’s SPS to South Littleton’s SPS For

The Project Manager The Determining Authority

t:\a operations\bob salmon\letter drop\ref annex a to south bowenfels sewerage schemsupgrade1 sans ownership details.docx

Page 11 of 38 pages 21-Aug-13

Refer to drawing 1102133-31 & 32

0. Pipeline Chainage (From pump station)

1. Property Details (Lot no & DP)

2. Ownership Details (Address)

3. Detailed Description of the Work Activity (See table 3 below)

4. Description of the existing environment 5. The likely Impact of the Work Activity on the Environment(See table 4 & 5 below)

6. The Existing Conditions – circa Mid to Late January 2013

(c) Regrowth re-established to 90-95%

710 to 730 Lot 2, DP 239,308

14

The proposal is to: clear the line, excavate, lay, backfill, compact and reinstate after installation - a shallow 250 to 355-NB pipeline & 3.2

4B1 Great Western Highway - road reserve with services and obstructing trees.

5. (a) Trees will be removed and replaced with semi mature stock. The trench will be open excavated, stock piles created and orange mesh/para- fencing installed.

(b) Fully reinstated and seeded

(c) Regrowth re-established to 90-95%

6.1

Page 12: Annex A to - REVIEW OF ENVIRONMENTAL FACTORS ...archive.lithgow.nsw.gov.au/documents/REF.Annex.A.To...t:\a operations\bob salmon\letter drop\ref annex a to south bowenfels sewerage

3/5.7

Annex A to South Bowenfel’s Sewerage Scheme Upgrade – Review of Environmental Factors (REF) By South Bowenfel’s SPS to South Littleton’s SPS For

The Project Manager The Determining Authority

t:\a operations\bob salmon\letter drop\ref annex a to south bowenfels sewerage schemsupgrade1 sans ownership details.docx

Page 12 of 38 pages 21-Aug-13

Refer to drawing 1102133-31 & 32

0. Pipeline Chainage (From pump station)

1. Property Details (Lot no & DP)

2. Ownership Details (Address)

3. Detailed Description of the Work Activity (See table 3 below)

4. Description of the existing environment 5. The likely Impact of the Work Activity on the Environment(See table 4 & 5 below)

6. The Existing Conditions – circa Mid to Late January 2013

730 to 750 Road reserve

15 The proposal is to: under bore, jack or pull a 250 to 355-NB pipe though the under bore and connect to the adjoining shallow 300-NB pipeline positioned there by Separable Portion 1

4B2 Great Western Highway - road reserve with services but no obstructing trees

6.2 Re-photo

750 to 772 Lot 3, DP 239,308

16

The proposal is to: clear the line, excavate, lay, backfill, compact and reinstate after installation - a shallow 250 to 355-NB pipeline; and to under bore, jack or pull a 250 to 355-NB pipe though the under bore and connect to the adjoining shallow 250 to 355-NB pipeline pre-positioned there.

4B1 Great Western Highway - road reserve with services and obstructing trees.

5. (a) Trees will be removed and replaced with semi mature stock. The trench will be open excavated, stock piles created and orange mesh/para- fencing installed.

(b) Fully reinstated and seeded

(c) Regrowth re-established to 90-95%

6.1

Page 13: Annex A to - REVIEW OF ENVIRONMENTAL FACTORS ...archive.lithgow.nsw.gov.au/documents/REF.Annex.A.To...t:\a operations\bob salmon\letter drop\ref annex a to south bowenfels sewerage

3/5.7

Annex A to South Bowenfel’s Sewerage Scheme Upgrade – Review of Environmental Factors (REF) By South Bowenfel’s SPS to South Littleton’s SPS For

The Project Manager The Determining Authority

t:\a operations\bob salmon\letter drop\ref annex a to south bowenfels sewerage schemsupgrade1 sans ownership details.docx

Page 13 of 38 pages 21-Aug-13

Refer to drawing 1102133-31 & 32

0. Pipeline Chainage (From pump station)

1. Property Details (Lot no & DP)

2. Ownership Details (Address)

3. Detailed Description of the Work Activity (See table 3 below)

4. Description of the existing environment 5. The likely Impact of the Work Activity on the Environment(See table 4 & 5 below)

6. The Existing Conditions – circa Mid to Late January 2013

772 to 795 Lot 6, DP776,529

17 The proposal is to: clear the line, excavate, lay, backfill, compact and reinstate after installation - a shallow 250 to 355-NB pipeline; and to under bore, jack or pull a 250 to 355-NB pipe though the under bore and connect to the adjoining shallow 250 to 355-NB pipeline pre-positioned there.

4B1 Great Western Highway - road reserve with services and obstructing trees.

5. (a) Trees will be removed and replaced with semi mature stock. The trench will be open excavated, stock piles created and orange mesh/para- fencing installed.

(b) Fully reinstated and seeded

(c) Regrowth re-established to 90-95%

6.1 Re Phot

795 to 827 Lot B, DP 345,053

18 The proposal is to: clear the line, excavate, lay, backfill, compact and reinstate after installation - a shallow 250 to 355-NB pipeline & 3.2

4B1 Great Western Highway - road reserve with services and obstructing trees.

5. (a) Trees will be removed and replaced with semi mature stock. The trench will be open excavated, stock piles created and orange mesh/para- fencing installed.

(b) Fully reinstated and seeded

6.1

Page 14: Annex A to - REVIEW OF ENVIRONMENTAL FACTORS ...archive.lithgow.nsw.gov.au/documents/REF.Annex.A.To...t:\a operations\bob salmon\letter drop\ref annex a to south bowenfels sewerage

3/5.7

Annex A to South Bowenfel’s Sewerage Scheme Upgrade – Review of Environmental Factors (REF) By South Bowenfel’s SPS to South Littleton’s SPS For

The Project Manager The Determining Authority

t:\a operations\bob salmon\letter drop\ref annex a to south bowenfels sewerage schemsupgrade1 sans ownership details.docx

Page 14 of 38 pages 21-Aug-13

Refer to drawing 1102133-31 & 32

0. Pipeline Chainage (From pump station)

1. Property Details (Lot no & DP)

2. Ownership Details (Address)

3. Detailed Description of the Work Activity (See table 3 below)

4. Description of the existing environment 5. The likely Impact of the Work Activity on the Environment(See table 4 & 5 below)

6. The Existing Conditions – circa Mid to Late January 2013

(c) Regrowth re-established to 90-95%

827 to 850 Lot A, DP 345,053

19 The proposal is to: clear the line, excavate, lay, backfill, compact and reinstate after installation - a shallow 250 to 355-NB pipeline; and to under bore, jack or pull a 250 to 355-NB pipe though the under bore and connect to the adjoining shallow 250 to 355-NB pipeline pre-positioned there.

4B1 Great Western Highway - road reserve with services and obstructing trees.

5. (a) Trees will be removed and replaced with semi mature stock. The trench will be open excavated, stock piles created and orange mesh/para- fencing installed.

b) Fully reinstated and seeded

(c) Regrowth re-established to 90-95%

6.1

Page 15: Annex A to - REVIEW OF ENVIRONMENTAL FACTORS ...archive.lithgow.nsw.gov.au/documents/REF.Annex.A.To...t:\a operations\bob salmon\letter drop\ref annex a to south bowenfels sewerage

3/5.7

Annex A to South Bowenfel’s Sewerage Scheme Upgrade – Review of Environmental Factors (REF) By South Bowenfel’s SPS to South Littleton’s SPS For

The Project Manager The Determining Authority

t:\a operations\bob salmon\letter drop\ref annex a to south bowenfels sewerage schemsupgrade1 sans ownership details.docx

Page 15 of 38 pages 21-Aug-13

Refer to drawing 1102133-31 & 32

0. Pipeline Chainage (From pump station)

1. Property Details (Lot no & DP)

2. Ownership Details (Address)

3. Detailed Description of the Work Activity (See table 3 below)

4. Description of the existing environment 5. The likely Impact of the Work Activity on the Environment(See table 4 & 5 below)

6. The Existing Conditions – circa Mid to Late January 2013

850 to 902 Lot 3, DP 2,288

20 The proposal is to: clear the line, excavate, lay, backfill, compact and reinstate after installation - a shallow 250 to 355-NB pipeline; and to under bore, jack or pull a 250 to 355-NB pipe though the under bore and connect to the adjoining shallow 250 to 355-NB pipeline pre-positioned there.

4B1 Great Western Highway - road reserve with services and obstructing trees.

5.(a) Trees will be removed and replaced with semi mature stock. The trench will be open excavated, stock piles created and orange mesh/para- fencing installed.

b) Fully reinstated and seeded

(c) Regrowth re-established to 90-95%

6.1

Page 16: Annex A to - REVIEW OF ENVIRONMENTAL FACTORS ...archive.lithgow.nsw.gov.au/documents/REF.Annex.A.To...t:\a operations\bob salmon\letter drop\ref annex a to south bowenfels sewerage

3/5.7

Annex A to South Bowenfel’s Sewerage Scheme Upgrade – Review of Environmental Factors (REF) By South Bowenfel’s SPS to South Littleton’s SPS For

The Project Manager The Determining Authority

t:\a operations\bob salmon\letter drop\ref annex a to south bowenfels sewerage schemsupgrade1 sans ownership details.docx

Page 16 of 38 pages 21-Aug-13

Refer to drawing 1102133-31 & 32

0. Pipeline Chainage (From pump station)

1. Property Details (Lot no & DP)

2. Ownership Details (Address)

3. Detailed Description of the Work Activity (See table 3 below)

4. Description of the existing environment 5. The likely Impact of the Work Activity on the Environment(See table 4 & 5 below)

6. The Existing Conditions – circa Mid to Late January 2013

902 to 950 Lot 2, ,DP 2,288

21 The proposal is to: clear the line, excavate, lay, backfill, compact and reinstate after installation - a shallow 250 to 355-NB pipeline; and to under bore, jack or pull a 250 to 355-NB pipe though the under bore and connect to the adjoining shallow 250 to 355-NB pipeline pre-positioned there.

4B1 Great Western Highway - road reserve with services and obstructing trees.

5.(a) Trees will be removed and replaced with semi mature stock. The trench will be open excavated, stock piles created and orange mesh/para- fencing installed.

(b) Fully reinstated and seeded

(c) Regrowth re-established to 90-95%

6.1

Page 17: Annex A to - REVIEW OF ENVIRONMENTAL FACTORS ...archive.lithgow.nsw.gov.au/documents/REF.Annex.A.To...t:\a operations\bob salmon\letter drop\ref annex a to south bowenfels sewerage

3/5.7

Annex A to South Bowenfel’s Sewerage Scheme Upgrade – Review of Environmental Factors (REF) By South Bowenfel’s SPS to South Littleton’s SPS For

The Project Manager The Determining Authority

t:\a operations\bob salmon\letter drop\ref annex a to south bowenfels sewerage schemsupgrade1 sans ownership details.docx

Page 17 of 38 pages 21-Aug-13

Refer to drawing 1102133-31 & 32

0. Pipeline Chainage (From pump station)

1. Property Details (Lot no & DP)

2. Ownership Details (Address)

3. Detailed Description of the Work Activity (See table 3 below)

4. Description of the existing environment 5. The likely Impact of the Work Activity on the Environment(See table 4 & 5 below)

6. The Existing Conditions – circa Mid to Late January 2013

950 to 1010 Lot 1, DP 780, 087

22 The proposal is to: clear the line, excavate, lay, backfill, compact and reinstate after installation - a shallow 250 to 355-NB pipeline; and to under bore, jack or pull a 250 to 355-NB pipe though the under bore and connect to the adjoining shallow 250 to 355-NB pipeline pre-positioned there.

4B1 Great Western Highway - road reserve with services and obstructing trees.

5.(a) Trees will be removed and replaced with semi mature stock. The trench will be open excavated, stock piles created and orange mesh/para- fencing installed.

(b) Fully reinstated and seeded

(c) Regrowth re-established to 90-95%

6.1

Page 18: Annex A to - REVIEW OF ENVIRONMENTAL FACTORS ...archive.lithgow.nsw.gov.au/documents/REF.Annex.A.To...t:\a operations\bob salmon\letter drop\ref annex a to south bowenfels sewerage

3/5.7

Annex A to South Bowenfel’s Sewerage Scheme Upgrade – Review of Environmental Factors (REF) By South Bowenfel’s SPS to South Littleton’s SPS For

The Project Manager The Determining Authority

t:\a operations\bob salmon\letter drop\ref annex a to south bowenfels sewerage schemsupgrade1 sans ownership details.docx

Page 18 of 38 pages 21-Aug-13

Refer to drawing 1102133-31 & 32

0. Pipeline Chainage (From pump station)

1. Property Details (Lot no & DP)

2. Ownership Details (Address)

3. Detailed Description of the Work Activity (See table 3 below)

4. Description of the existing environment 5. The likely Impact of the Work Activity on the Environment(See table 4 & 5 below)

6. The Existing Conditions – circa Mid to Late January 2013

1010 to 1030

Lot 1, DP 594, 343

23 The proposal is to: clear the line, excavate, lay, backfill, compact and reinstate after installation - a shallow 250 to 355-NB pipeline; and to under bore, jack or pull a 250 to 355-NB pipe though the under bore and connect to the adjoining shallow 250 to 355-NB pipeline pre-positioned there.

4B1 Great Western Highway - road reserve with services and obstructing trees.

5.(a) Trees will be removed and replaced with semi mature stock. The trench will be open excavated, stock piles created and orange mesh/para- fencing installed.

(b) Fully reinstated and seeded

(c) Regrowth re-established to 90-95%

6.1

Page 19: Annex A to - REVIEW OF ENVIRONMENTAL FACTORS ...archive.lithgow.nsw.gov.au/documents/REF.Annex.A.To...t:\a operations\bob salmon\letter drop\ref annex a to south bowenfels sewerage

3/5.7

Annex A to South Bowenfel’s Sewerage Scheme Upgrade – Review of Environmental Factors (REF) By South Bowenfel’s SPS to South Littleton’s SPS For

The Project Manager The Determining Authority

t:\a operations\bob salmon\letter drop\ref annex a to south bowenfels sewerage schemsupgrade1 sans ownership details.docx

Page 19 of 38 pages 21-Aug-13

Refer to drawing 1102133-31 & 32

0. Pipeline Chainage (From pump station)

1. Property Details (Lot no & DP)

2. Ownership Details (Address)

3. Detailed Description of the Work Activity (See table 3 below)

4. Description of the existing environment 5. The likely Impact of the Work Activity on the Environment(See table 4 & 5 below)

6. The Existing Conditions – circa Mid to Late January 2013

1030 to 1081

Lot 2, DP 524,479

24 The proposal is to: clear the line, excavate, lay, backfill, compact and reinstate after installation - a shallow 250 to 355-NB pipeline; and to under bore, jack or pull a 250 to 355-NB pipe though the under bore and connect to the adjoining shallow 250 to 355-NB pipeline pre-positioned there.

4B1 Great Western Highway - road reserve with services and obstructing trees.

5.(a) Trees will be removed and replaced with semi mature stock. The trench will be open excavated, stock piles created and orange mesh/para- fencing installed.

(b) Fully reinstated and seeded

(c) Regrowth re-established to 90-95%

6.1

1081 to 1120

Lot 1, DP 524,479

25 The proposal is to: clear the line, excavate, lay, backfill, compact and reinstate after installation - a shallow 250 to 355-NB pipeline & 3.2

4B1 Great Western Highway - road reserve with services and obstructing trees.

5.(a) Trees will be removed and replaced with semi mature stock. The trench will be open excavated, stock piles created and orange mesh/para- fencing installed.

(b) Fully reinstated and seeded

6.1

Page 20: Annex A to - REVIEW OF ENVIRONMENTAL FACTORS ...archive.lithgow.nsw.gov.au/documents/REF.Annex.A.To...t:\a operations\bob salmon\letter drop\ref annex a to south bowenfels sewerage

3/5.7

Annex A to South Bowenfel’s Sewerage Scheme Upgrade – Review of Environmental Factors (REF) By South Bowenfel’s SPS to South Littleton’s SPS For

The Project Manager The Determining Authority

t:\a operations\bob salmon\letter drop\ref annex a to south bowenfels sewerage schemsupgrade1 sans ownership details.docx

Page 20 of 38 pages 21-Aug-13

Refer to drawing 1102133-31 & 32

0. Pipeline Chainage (From pump station)

1. Property Details (Lot no & DP)

2. Ownership Details (Address)

3. Detailed Description of the Work Activity (See table 3 below)

4. Description of the existing environment 5. The likely Impact of the Work Activity on the Environment(See table 4 & 5 below)

6. The Existing Conditions – circa Mid to Late January 2013

(c) Regrowth re-established to 90-95%

1120 to 1137

Road reserve

26 The proposal is to: clear the line, excavate, lay, backfill, compact and reinstate after installation - a shallow 250 to 355-NB pipeline; and to under bore, jack or pull a 250 to 355-NB pipe though the under bore and connect to the adjoining shallow 250 to 355-NB pipeline pre-positioned there.

4B1 Great Western Highway - road reserve with services and obstructing trees.

5.(a) Trees will be removed and replaced with semi mature stock. The trench will be open excavated, stock piles created and orange mesh/para- fencing installed.

(b) Fully reinstated and seeded

(c) Regrowth re-established to 90-95%

6.2

Page 21: Annex A to - REVIEW OF ENVIRONMENTAL FACTORS ...archive.lithgow.nsw.gov.au/documents/REF.Annex.A.To...t:\a operations\bob salmon\letter drop\ref annex a to south bowenfels sewerage

3/5.7

Annex A to South Bowenfel’s Sewerage Scheme Upgrade – Review of Environmental Factors (REF) By South Bowenfel’s SPS to South Littleton’s SPS For

The Project Manager The Determining Authority

t:\a operations\bob salmon\letter drop\ref annex a to south bowenfels sewerage schemsupgrade1 sans ownership details.docx

Page 21 of 38 pages 21-Aug-13

Refer to drawing 1102133-31 & 32

0. Pipeline Chainage (From pump station)

1. Property Details (Lot no & DP)

2. Ownership Details (Address)

3. Detailed Description of the Work Activity (See table 3 below)

4. Description of the existing environment 5. The likely Impact of the Work Activity on the Environment(See table 4 & 5 below)

6. The Existing Conditions – circa Mid to Late January 2013

1137 to 1180

Lot 3, DP 28,254

27 The proposal is to: clear the line, excavate, lay, backfill, compact and reinstate after installation - a shallow 250 to 355-NB pipeline;

4B1 Great Western Highway - road reserve with services and obstructing trees.

5.(a) Trees will be removed and replaced with semi mature stock. The trench will be open excavated, stock piles created and orange mesh/para- fencing installed.

(b) Fully reinstated and seeded

(c) Regrowth re-established to 90-95%

6.1

670 to 827 Great Western Highway

28 The proposal is to: clear the line, excavate, lay, backfill, compact and reinstate after installation – of a shallow 250 to 355-NB pipeline; and to under bore, jack or pull a 250 to 355-NB pipe though the under bore and connect to the adjoining shallow 250 to 355-NB pipeline pre-positioned there.

4B1 Great Western Highway - road reserve with services and obstructing trees.

5.(a) Trees will be removed and replaced with semi mature stock. The trench will be open excavated, stock piles created and orange mesh/para- fencing installed.

(b) Fully reinstated and seeded

6.1 See photos at the intermediate chainages above.

Page 22: Annex A to - REVIEW OF ENVIRONMENTAL FACTORS ...archive.lithgow.nsw.gov.au/documents/REF.Annex.A.To...t:\a operations\bob salmon\letter drop\ref annex a to south bowenfels sewerage

3/5.7

Annex A to South Bowenfel’s Sewerage Scheme Upgrade – Review of Environmental Factors (REF) By South Bowenfel’s SPS to South Littleton’s SPS For

The Project Manager The Determining Authority

t:\a operations\bob salmon\letter drop\ref annex a to south bowenfels sewerage schemsupgrade1 sans ownership details.docx

Page 22 of 38 pages 21-Aug-13

Refer to drawing 1102133-31 & 32

0. Pipeline Chainage (From pump station)

1. Property Details (Lot no & DP)

2. Ownership Details (Address)

3. Detailed Description of the Work Activity (See table 3 below)

4. Description of the existing environment 5. The likely Impact of the Work Activity on the Environment(See table 4 & 5 below)

6. The Existing Conditions – circa Mid to Late January 2013

(c) Regrowth re-established to 90-95%

827 to 1080 Great Western Highway

29 The proposal is to: clear the line, excavate, lay, backfill, compact and reinstate after installation - a shallow 250 to 355-NB pipeline; and to under bore, jack or pull a 250 to 355-NB pipe though the under bore and connect to the adjoining shallow 250 to 355-NB pipeline pre-positioned there.

4B1 Great Western Highway - road reserve with services and obstructing trees.

5.(a) Trees will be removed and replaced with semi mature stock. The trench will be open excavated, stock piles created and orange mesh/para- fencing installed.

(b) Fully reinstated and seeded

(c) Regrowth re-established to 90-95%

6.16.1 See photos at the intermediate chainages above.

Page 23: Annex A to - REVIEW OF ENVIRONMENTAL FACTORS ...archive.lithgow.nsw.gov.au/documents/REF.Annex.A.To...t:\a operations\bob salmon\letter drop\ref annex a to south bowenfels sewerage

3/5.7

Annex A to South Bowenfel’s Sewerage Scheme Upgrade – Review of Environmental Factors (REF) By South Bowenfel’s SPS to South Littleton’s SPS For

The Project Manager The Determining Authority

t:\a operations\bob salmon\letter drop\ref annex a to south bowenfels sewerage schemsupgrade1 sans ownership details.docx

Page 23 of 38 pages 21-Aug-13

Refer to drawing 1102133-31 & 32

0. Pipeline Chainage (From pump station)

1. Property Details (Lot no & DP)

2. Ownership Details (Address)

3. Detailed Description of the Work Activity (See table 3 below)

4. Description of the existing environment 5. The likely Impact of the Work Activity on the Environment(See table 4 & 5 below)

6. The Existing Conditions – circa Mid to Late January 2013

1080 to 1120

LCC 30 3.2. The proposal is to: under bore, jack or pull a 250 to 355-NB pipe though the under bore and connect to the adjoining shallow 300-NB pipeline positioned there by

4B2 Great Western Highway - road reserve with services but no obstructing trees.

5. (a) Open excavation, stock piles, orange mesh/para- fencing

(b) Fully reinstated and seeded

(c) Regrowth re-established to 90-95%

6.1

1120 to 1220

Great Western Highway

31 3.1. The proposal is to: clear the line, excavate, lay, backfill, compact and reinstate after installation of a shallow 250 to 355-NB pipeline

4C1 Town road reserve – footpath with services & obstructing trees

5. (a) Trees will be removed and replaced with semi mature stock. The trench will be open excavated, stock piles created and orange mesh/para- fencing installed.

(b) Fully reinstated and seeded

(c) Regrowth re-established to 90-95%

6.1

Page 24: Annex A to - REVIEW OF ENVIRONMENTAL FACTORS ...archive.lithgow.nsw.gov.au/documents/REF.Annex.A.To...t:\a operations\bob salmon\letter drop\ref annex a to south bowenfels sewerage

3/5.7

Annex A to South Bowenfel’s Sewerage Scheme Upgrade – Review of Environmental Factors (REF) By South Bowenfel’s SPS to South Littleton’s SPS For

The Project Manager The Determining Authority

t:\a operations\bob salmon\letter drop\ref annex a to south bowenfels sewerage schemsupgrade1 sans ownership details.docx

Page 24 of 38 pages 21-Aug-13

Refer to drawing 1102133-31 & 32

0. Pipeline Chainage (From pump station)

1. Property Details (Lot no & DP)

2. Ownership Details (Address)

3. Detailed Description of the Work Activity (See table 3 below)

4. Description of the existing environment 5. The likely Impact of the Work Activity on the Environment(See table 4 & 5 below)

6. The Existing Conditions – circa Mid to Late January 2013

Page 25: Annex A to - REVIEW OF ENVIRONMENTAL FACTORS ...archive.lithgow.nsw.gov.au/documents/REF.Annex.A.To...t:\a operations\bob salmon\letter drop\ref annex a to south bowenfels sewerage

3/5.7

Annex A to South Bowenfel’s Sewerage Scheme Upgrade – Review of Environmental Factors (REF) By South Littleton’s SPS to Sewage Pump Station No 1 (SPS No 1) For

The Project Manager The Determining Authority

t:\a operations\bob salmon\letter drop\ref annex a to south bowenfels sewerage schemsupgrade1 sans ownership details.docx

Page 25 of 38 pages 21-Aug-13

The REF MATRIX –

Refer to drawing 1102133-61 to 64

0. Pipeline Chainage (From Pump Station)

1. Property Details (Lot No & DP)

2. Ownership Details (Address)

3. Detailed Description of Proposal (See table 3 above)

4. Description of the existing environment 5. The likely Impact of the Development on the Environment (See table 4 & 5 above)

6. What Steps will be taken to Protect the Environment (See table 6 above)

00.0 to 20.8 Lot 321, DP 1,142,036

32 3.1. The proposal is to: clear the line, excavate, lay, backfill, compact and reinstate after installation of a shallow 250 to 355-NB pipeline

4C1 Town road reserve – footpath with services & obstructing trees

5(a) Trees will be removed and replaced with semi mature stock. The trench will be open excavated, stock piles created and orange mesh/para-fencing placed.

5(b) Fully reinstated and seeded

5(c) Regrowth re-established to 90-95%

Page 26: Annex A to - REVIEW OF ENVIRONMENTAL FACTORS ...archive.lithgow.nsw.gov.au/documents/REF.Annex.A.To...t:\a operations\bob salmon\letter drop\ref annex a to south bowenfels sewerage

3/5.7

Annex A to South Bowenfel’s Sewerage Scheme Upgrade – Review of Environmental Factors (REF) By South Littleton’s SPS to Sewage Pump Station No 1 (SPS No 1) For

The Project Manager The Determining Authority

t:\a operations\bob salmon\letter drop\ref annex a to south bowenfels sewerage schemsupgrade1 sans ownership details.docx

Page 26 of 38 pages 21-Aug-13

Refer to drawing 1102133-61 to 64

0. Pipeline Chainage (From Pump Station)

1. Property Details (Lot No & DP)

2. Ownership Details (Address)

3. Detailed Description of Proposal (See table 3 above)

4. Description of the existing environment 5. The likely Impact of the Development on the Environment (See table 4 & 5 above)

6. What Steps will be taken to Protect the Environment (See table 6 above)

20.8 to 118.0

Great Western Highway, classified - arterial

33 3.1. The proposal is to: clear the line, excavate, lay, backfill, compact and reinstate after installation of a shallow 250 to 355-NB pipeline

4B1 Great Western Highway - road reserve with services and obstructing trees

5(a) Trees will be removed and replaced with semi mature stock. The trench will be open excavated, stock piles created and orange mesh/para-fencing placed.

5(b) Fully reinstated and seeded

5(c) Regrowth re-established to 90-95%

90 to 235 Great Western Highway, classified - arterial

34 3.1. The proposal is to: clear the line, excavate, lay, backfill, compact and reinstate after installation of a shallow 250 to 355-NB pipeline

4B1 Great Western Highway - road reserve with services and obstructing trees

5(a) Trees will be removed and replaced with semi mature stock. The trench will be open excavated, stock piles created and orange mesh/para-fencing placed.

5(b) Fully reinstated and seeded

Page 27: Annex A to - REVIEW OF ENVIRONMENTAL FACTORS ...archive.lithgow.nsw.gov.au/documents/REF.Annex.A.To...t:\a operations\bob salmon\letter drop\ref annex a to south bowenfels sewerage

3/5.7

Annex A to South Bowenfel’s Sewerage Scheme Upgrade – Review of Environmental Factors (REF) By South Littleton’s SPS to Sewage Pump Station No 1 (SPS No 1) For

The Project Manager The Determining Authority

t:\a operations\bob salmon\letter drop\ref annex a to south bowenfels sewerage schemsupgrade1 sans ownership details.docx

Page 27 of 38 pages 21-Aug-13

Refer to drawing 1102133-61 to 64

0. Pipeline Chainage (From Pump Station)

1. Property Details (Lot No & DP)

2. Ownership Details (Address)

3. Detailed Description of Proposal (See table 3 above)

4. Description of the existing environment 5. The likely Impact of the Development on the Environment (See table 4 & 5 above)

6. What Steps will be taken to Protect the Environment (See table 6 above)

5(c) Regrowth re-established to 90-95%

175 to 270 Great Western Highway, classified - arterial

35 3.2. The proposal is to: under bore, jack or pull a 250 to 355-NB pipe though the under bore and connect to the adjoining shallow 300-NB pipeline positioned there by Separable Portion 1

4B1 Great Western Highway - road reserve with services and obstructing trees

5(e) No discernible impact expected

6.1.

6.2 Under bore the obstructing feature

Page 28: Annex A to - REVIEW OF ENVIRONMENTAL FACTORS ...archive.lithgow.nsw.gov.au/documents/REF.Annex.A.To...t:\a operations\bob salmon\letter drop\ref annex a to south bowenfels sewerage

3/5.7

Annex A to South Bowenfel’s Sewerage Scheme Upgrade – Review of Environmental Factors (REF) By South Littleton’s SPS to Sewage Pump Station No 1 (SPS No 1) For

The Project Manager The Determining Authority

t:\a operations\bob salmon\letter drop\ref annex a to south bowenfels sewerage schemsupgrade1 sans ownership details.docx

Page 28 of 38 pages 21-Aug-13

Refer to drawing 1102133-61 to 64

0. Pipeline Chainage (From Pump Station)

1. Property Details (Lot No & DP)

2. Ownership Details (Address)

3. Detailed Description of Proposal (See table 3 above)

4. Description of the existing environment 5. The likely Impact of the Development on the Environment (See table 4 & 5 above)

6. What Steps will be taken to Protect the Environment (See table 6 above)

118 to 175 Great Western Highway, classified - arterial

36 3.1. The proposal is to: clear the line, excavate, lay, backfill, compact and reinstate after installation of a shallow 250 to 355-NB pipeline

4B1. Great Western Highway - road reserve with services and obstructing trees

5(a) Trees will be removed and replaced with semi mature stock. The trench will be open excavated, stock piles created and orange mesh/para-fencing placed.

5(b) Fully reinstated and seeded

5(c) Regrowth re-established to 90-95%

270 to 470 Great Western Highway, classified - arterial

37 3.1. The proposal is to: clear the line, excavate, lay, backfill, compact and reinstate after installation of a shallow 250 to 355-NB pipeline

4C2 Town Road Reserve – footpath with services but no obstructing trees

5(a) Open excavation, stock piles, orange mesh/para- fencing

5(b) Fully reinstated and seeded

5(c) Regrowth re-established to 90-95%%

Page 29: Annex A to - REVIEW OF ENVIRONMENTAL FACTORS ...archive.lithgow.nsw.gov.au/documents/REF.Annex.A.To...t:\a operations\bob salmon\letter drop\ref annex a to south bowenfels sewerage

3/5.7

Annex A to South Bowenfel’s Sewerage Scheme Upgrade – Review of Environmental Factors (REF) By South Littleton’s SPS to Sewage Pump Station No 1 (SPS No 1) For

The Project Manager The Determining Authority

t:\a operations\bob salmon\letter drop\ref annex a to south bowenfels sewerage schemsupgrade1 sans ownership details.docx

Page 29 of 38 pages 21-Aug-13

Refer to drawing 1102133-61 to 64

0. Pipeline Chainage (From Pump Station)

1. Property Details (Lot No & DP)

2. Ownership Details (Address)

3. Detailed Description of Proposal (See table 3 above)

4. Description of the existing environment 5. The likely Impact of the Development on the Environment (See table 4 & 5 above)

6. What Steps will be taken to Protect the Environment (See table 6 above)

470 to 544 Great Western Highway, classified - arterial

38 3.1. The proposal is to: clear the line, excavate, lay, backfill, compact and reinstate after installation of a shallow 250 to 355-NB pipeline

4C2 Town Road Reserve – footpath with services but no obstructing trees

5(a) Open excavation, stock piles, orange mesh/para- fencing

5(b) Fully reinstated and seeded

5(c) Regrowth re-established to 90-95%

544 to708 Lot 2, DP 575,137

39 3.1. The proposal is to: clear the line, excavate, lay, backfill, compact and reinstate after installation of a shallow 250 to 355-NB pipeline

4C2 Town Road Reserve – footpath with services but no obstructing trees

5(a) Open excavation, stock piles, orange mesh/para- fencing

5(b) Fully reinstated and seeded

5(c) Regrowth re-established to 90-95%

Page 30: Annex A to - REVIEW OF ENVIRONMENTAL FACTORS ...archive.lithgow.nsw.gov.au/documents/REF.Annex.A.To...t:\a operations\bob salmon\letter drop\ref annex a to south bowenfels sewerage

3/5.7

Annex A to South Bowenfel’s Sewerage Scheme Upgrade – Review of Environmental Factors (REF) By South Littleton’s SPS to Sewage Pump Station No 1 (SPS No 1) For

The Project Manager The Determining Authority

t:\a operations\bob salmon\letter drop\ref annex a to south bowenfels sewerage schemsupgrade1 sans ownership details.docx

Page 30 of 38 pages 21-Aug-13

Refer to drawing 1102133-61 to 64

0. Pipeline Chainage (From Pump Station)

1. Property Details (Lot No & DP)

2. Ownership Details (Address)

3. Detailed Description of Proposal (See table 3 above)

4. Description of the existing environment 5. The likely Impact of the Development on the Environment (See table 4 & 5 above)

6. What Steps will be taken to Protect the Environment (See table 6 above)

708 to 825 Lot 2, DP 575,137

40 3.1. The proposal is to: clear the line, excavate, lay, backfill, compact and reinstate after installation of a shallow 250 to 355-NB pipeline

4C2 Endeavour Park Reserve – footpath with services but no obstructing trees

5(a) Open excavation, stock piles, orange mesh/para- fencing

5(b) Fully reinstated and seeded

5(c) Regrowth re-established to 90-95%

830 to 960 Lot 13, DP 231,890

41 3.1. The proposal is to: clear the line, excavate, lay, backfill, compact and reinstate after installation of a shallow 250 to 355-NB pipeline

4C2 Endeavour Park Reserve – footpath with services but no obstructing trees

5(a) Open excavation, stock piles, orange mesh/para- fencing

5(b) Fully reinstated and seeded

5(c) Regrowth re-established to 90-95%

Page 31: Annex A to - REVIEW OF ENVIRONMENTAL FACTORS ...archive.lithgow.nsw.gov.au/documents/REF.Annex.A.To...t:\a operations\bob salmon\letter drop\ref annex a to south bowenfels sewerage

3/5.7

Annex A to South Bowenfel’s Sewerage Scheme Upgrade – Review of Environmental Factors (REF) By South Littleton’s SPS to Sewage Pump Station No 1 (SPS No 1) For

The Project Manager The Determining Authority

t:\a operations\bob salmon\letter drop\ref annex a to south bowenfels sewerage schemsupgrade1 sans ownership details.docx

Page 31 of 38 pages 21-Aug-13

Refer to drawing 1102133-61 to 64

0. Pipeline Chainage (From Pump Station)

1. Property Details (Lot No & DP)

2. Ownership Details (Address)

3. Detailed Description of Proposal (See table 3 above)

4. Description of the existing environment 5. The likely Impact of the Development on the Environment (See table 4 & 5 above)

6. What Steps will be taken to Protect the Environment (See table 6 above)

960 to 1077 Lot 23, DP 245,671

42 3.1. The proposal is to: clear the line, excavate, lay, backfill, compact and reinstate after installation of a shallow 250 to 355-NB pipeline

4C2 Town Road Reserve – footpath with services but no obstructing trees

5(a) Open excavation, stock piles, orange mesh/para- fencing

5(b) Fully reinstated and seeded

5(c) Regrowth re-established to 90-95%

1077 to 1257

Lot 4, DP 231,516

43 3.1. The proposal is to: clear the line, excavate, lay, backfill, compact and reinstate after installation of a deeper 250 to 355-NB pipeline

4C2 Town Road Reserve – footpath with services but no obstructing trees

Page 32: Annex A to - REVIEW OF ENVIRONMENTAL FACTORS ...archive.lithgow.nsw.gov.au/documents/REF.Annex.A.To...t:\a operations\bob salmon\letter drop\ref annex a to south bowenfels sewerage

3/5.7

Annex A to South Bowenfel’s Sewerage Scheme Upgrade – Review of Environmental Factors (REF) By South Littleton’s SPS to Sewage Pump Station No 1 (SPS No 1) For

The Project Manager The Determining Authority

t:\a operations\bob salmon\letter drop\ref annex a to south bowenfels sewerage schemsupgrade1 sans ownership details.docx

Page 32 of 38 pages 21-Aug-13

Refer to drawing 1102133-61 to 64

0. Pipeline Chainage (From Pump Station)

1. Property Details (Lot No & DP)

2. Ownership Details (Address)

3. Detailed Description of Proposal (See table 3 above)

4. Description of the existing environment 5. The likely Impact of the Development on the Environment (See table 4 & 5 above)

6. What Steps will be taken to Protect the Environment (See table 6 above)

1257 to 1327

Lot 45, DP 247,845

44 3.1. The proposal is to: clear the line, excavate, lay, backfill, compact and reinstate after installation of a deeper 250 to 355-NB pipeline

4C2 Town Road Reserve – footpath with services but no obstructing trees

1327 to 1438

Lot 256,

DP 9,370

45 3.1. The proposal is to: clear the line, excavate, lay, backfill, compact and reinstate after installation of a shallow 250 to 355-NB pipeline

4C1 Town road reserve – footpath with services & obstructing trees

5(a) Trees will be removed and replaced with semi mature stock. The trench will be open excavated, stock piles created and orange mesh/para-fencing placed.

5(b) Fully reinstated and seeded

5(c) Regrowth re-established to 90-95%

Page 33: Annex A to - REVIEW OF ENVIRONMENTAL FACTORS ...archive.lithgow.nsw.gov.au/documents/REF.Annex.A.To...t:\a operations\bob salmon\letter drop\ref annex a to south bowenfels sewerage

3/5.7

Annex A to South Bowenfel’s Sewerage Scheme Upgrade – Review of Environmental Factors (REF) By South Littleton’s SPS to Sewage Pump Station No 1 (SPS No 1) For

The Project Manager The Determining Authority

t:\a operations\bob salmon\letter drop\ref annex a to south bowenfels sewerage schemsupgrade1 sans ownership details.docx

Page 33 of 38 pages 21-Aug-13

Refer to drawing 1102133-61 to 64

0. Pipeline Chainage (From Pump Station)

1. Property Details (Lot No & DP)

2. Ownership Details (Address)

3. Detailed Description of Proposal (See table 3 above)

4. Description of the existing environment 5. The likely Impact of the Development on the Environment (See table 4 & 5 above)

6. What Steps will be taken to Protect the Environment (See table 6 above)

1438 to 1661

Lot 774 & 775, DP 24,785

46 3.1. The proposal is to: clear the line, excavate, lay, backfill, compact and reinstate after installation of a shallow 250 to 355-NB pipeline

4C2 Town Road Reserve – footpath with services but no obstructing trees

5(a) Open excavation, stock piles, orange mesh/para- fencing

5(b) Fully reinstated and seeded

5(c) Regrowth re-established to 90-95%

1661 to 1840

Lot 292, DP 9,370

47 3.1. The proposal is to: clear the line, excavate, lay, backfill, compact and reinstate after installation of a shallow 250 to 355-NB pipeline

4C2 Town Road Reserve – footpath with services but no obstructing trees

5(a) Open excavation, stock piles, orange mesh/para- fencing

5(b) Fully reinstated and seeded

5(c) Regrowth re-established to 90-95%

Page 34: Annex A to - REVIEW OF ENVIRONMENTAL FACTORS ...archive.lithgow.nsw.gov.au/documents/REF.Annex.A.To...t:\a operations\bob salmon\letter drop\ref annex a to south bowenfels sewerage

3/5.7

Annex A to South Bowenfel’s Sewerage Scheme Upgrade – Review of Environmental Factors (REF) By South Littleton’s SPS to Sewage Pump Station No 1 (SPS No 1) For

The Project Manager The Determining Authority

t:\a operations\bob salmon\letter drop\ref annex a to south bowenfels sewerage schemsupgrade1 sans ownership details.docx

Page 34 of 38 pages 21-Aug-13

Refer to drawing 1102133-61 to 64

0. Pipeline Chainage (From Pump Station)

1. Property Details (Lot No & DP)

2. Ownership Details (Address)

3. Detailed Description of Proposal (See table 3 above)

4. Description of the existing environment 5. The likely Impact of the Development on the Environment (See table 4 & 5 above)

6. What Steps will be taken to Protect the Environment (See table 6 above)

1840 to 1943

Lot 113 & 353, DP 9,370

48 3.1. The proposal is to: clear the line, excavate, lay, backfill, compact and reinstate after installation of a deeper 250 to 355-NB pipeline

4C2 Town Road Reserve – footpath with services but no obstructing trees

1914 to 1952

Lot 353, DP 9,370

49 3.2. The proposal is to: under bore, jack or pull a 250 to 355-NB pipe though the under bore and connect to the adjoining shallow 300-NB pipeline positioned there by Separable

5(a) Trees will be removed and replaced with semi mature stock. The trench will be open excavated, stock piles created and orange mesh/para-fencing placed.

5(b) Fully reinstated and seeded

5(c) Regrowth re-established to 90-95%

Page 35: Annex A to - REVIEW OF ENVIRONMENTAL FACTORS ...archive.lithgow.nsw.gov.au/documents/REF.Annex.A.To...t:\a operations\bob salmon\letter drop\ref annex a to south bowenfels sewerage

3/5.7

Annex A to South Bowenfel’s Sewerage Scheme Upgrade – Review of Environmental Factors (REF) By South Littleton’s SPS to Sewage Pump Station No 1 (SPS No 1) For

The Project Manager The Determining Authority

t:\a operations\bob salmon\letter drop\ref annex a to south bowenfels sewerage schemsupgrade1 sans ownership details.docx

Page 35 of 38 pages 21-Aug-13

Refer to drawing 1102133-61 to 64

0. Pipeline Chainage (From Pump Station)

1. Property Details (Lot No & DP)

2. Ownership Details (Address)

3. Detailed Description of Proposal (See table 3 above)

4. Description of the existing environment 5. The likely Impact of the Development on the Environment (See table 4 & 5 above)

6. What Steps will be taken to Protect the Environment (See table 6 above)

2001 to 1952

50 3.2. The proposal is to: under bore, jack or pull a 250 to 355-NB pipe though the under bore and connect to the adjoining shallow 300-NB pipeline positioned there by Separable

5(e) No discernible impact expected

2001 to 2045

Lot 2, DP 229,883

51 3.2. The proposal is to: under bore, jack or pull a 250 to 355-NB pipe though the under bore and connect to the adjoining shallow 300-NB pipeline positioned there by Separable

5(e) No discernible impact expected

Page 36: Annex A to - REVIEW OF ENVIRONMENTAL FACTORS ...archive.lithgow.nsw.gov.au/documents/REF.Annex.A.To...t:\a operations\bob salmon\letter drop\ref annex a to south bowenfels sewerage

3/5.7

Annex A to South Bowenfel’s Sewerage Scheme Upgrade – Review of Environmental Factors (REF) By South Littleton’s SPS to Sewage Pump Station No 1 (SPS No 1) For

The Project Manager The Determining Authority

t:\a operations\bob salmon\letter drop\ref annex a to south bowenfels sewerage schemsupgrade1 sans ownership details.docx

Page 36 of 38 pages 21-Aug-13

Refer to drawing 1102133-61 to 64

0. Pipeline Chainage (From Pump Station)

1. Property Details (Lot No & DP)

2. Ownership Details (Address)

3. Detailed Description of Proposal (See table 3 above)

4. Description of the existing environment 5. The likely Impact of the Development on the Environment (See table 4 & 5 above)

6. What Steps will be taken to Protect the Environment (See table 6 above)

2300 to 2169

Lot 2, DP 229,883

52 3.1. The proposal is to: clear the line, excavate, lay, backfill, compact and reinstate after installation of a deeper 250 to 355-NB pipeline

4A Grass land with some services

5(a) Open excavation, stock piles, orange mesh/para- fencing

5(b) Fully reinstated and seeded

5(c) Regrowth re-established to 90-95%

2003 to 2303

Lot 2, DP 229,883

53 3.1. The proposal is to: clear the line, excavate, lay, backfill, compact and reinstate after installation of a deeper 250 to 355-NB pipeline

4A Grass land with some services

5(a) Open excavation, stock piles, orange mesh/para- fencing

5(b) Fully reinstated and seeded

5(c) Regrowth re-established to 90-95%

Page 37: Annex A to - REVIEW OF ENVIRONMENTAL FACTORS ...archive.lithgow.nsw.gov.au/documents/REF.Annex.A.To...t:\a operations\bob salmon\letter drop\ref annex a to south bowenfels sewerage

3/5.7

Annex A to South Bowenfel’s Sewerage Scheme Upgrade – Review of Environmental Factors (REF) By South Littleton’s SPS to Sewage Pump Station No 1 (SPS No 1) For

The Project Manager The Determining Authority

t:\a operations\bob salmon\letter drop\ref annex a to south bowenfels sewerage schemsupgrade1 sans ownership details.docx

Page 37 of 38 pages 21-Aug-13

Refer to drawing 1102133-61 to 64

0. Pipeline Chainage (From Pump Station)

1. Property Details (Lot No & DP)

2. Ownership Details (Address)

3. Detailed Description of Proposal (See table 3 above)

4. Description of the existing environment 5. The likely Impact of the Development on the Environment (See table 4 & 5 above)

6. What Steps will be taken to Protect the Environment (See table 6 above)

2303 to 2400

Lot 2, DP 229,883

54 3.1. The proposal is to: clear the line, excavate, lay, backfill, compact and reinstate after installation of a deeper 250 to 355-NB pipeline

4A Grass land with some services

5(a) Open excavation, stock piles, orange mesh/para- fencing

5(b) Fully reinstated and seeded

5(c) Regrowth re-established to 90-95%

2364 to 2400

Lot 1, DP 125,085, Lot 2 DP 947, 828

55 3.2. The proposal is to: under bore, jack or pull a 250 to 355-NB pipe though the under bore and connect to the adjoining shallow 300-NB pipeline positioned there by Separable Portion No 1

5(e) No discernible impact expected

Page 38: Annex A to - REVIEW OF ENVIRONMENTAL FACTORS ...archive.lithgow.nsw.gov.au/documents/REF.Annex.A.To...t:\a operations\bob salmon\letter drop\ref annex a to south bowenfels sewerage

3/5.7

Annex A to South Bowenfel’s Sewerage Scheme Upgrade – Review of Environmental Factors (REF) By South Littleton’s SPS to Sewage Pump Station No 1 (SPS No 1) For

The Project Manager The Determining Authority

t:\a operations\bob salmon\letter drop\ref annex a to south bowenfels sewerage schemsupgrade1 sans ownership details.docx

Page 38 of 38 pages 21-Aug-13

Refer to drawing 1102133-61 to 64

0. Pipeline Chainage (From Pump Station)

1. Property Details (Lot No & DP)

2. Ownership Details (Address)

3. Detailed Description of Proposal (See table 3 above)

4. Description of the existing environment 5. The likely Impact of the Development on the Environment (See table 4 & 5 above)

6. What Steps will be taken to Protect the Environment (See table 6 above)

2352 to 2346

56 3.2. The proposal is to: under bore, jack or pull a 250 to 355-NB pipe though the under bore and connect to the adjoining shallow 300-NB pipeline positioned there by Separable

5(e) No discernible impact expected

`