3/5.7
Annex A to - REVIEW OF ENVIRONMENTAL FACTORS (REF) ASSOCIATED WITH THE SOUTH BOWENFEL’S SEWERAGE SCHEME.
Short Title - REF MATRIX
The description of the existing environment is presented in the form of a matrix where the basic reference document is:
1. drawing 1102133-31 & 32 (prepared by NSW PWD) – for the South Bowenfels rising main and gravity main,
2. drawing 1102133-61, 62, 63 & 64 (prepared by NSW PWD) – for the South Littleton rising main and gravity main,
3. table 3 (included below this page) – a detailed description of the (four components of the development) proposal,
4. table 4 & 5 (included below page 2) – a description of the existing environment and the likely impact of the development on the that environment, and finally
5. table 6 (included below page 3) – shows the steps that will be taken to protect that environment including sedimentation control.
This development will impact on the amenity of others at times during the construction period to the extent that noise and dust may be generated but overshadowing and traffic generation is not anticipated.
The length of the development is just under 4-kM so reference to any property along this route is best made by reference to the distance (chainages) shown on the drawings mentioned above. The origin of chainage is at the relevant pump station – South Bowenfels or South Littleton.
The covering matrix – the REF MATRIX – attempts to show the correlation between properties affected by the works at any chainage (see column 0 Pipeline Chainage. Column 1 Property Details. & Column 2 Ownership Details.) table 3, table 4 & 5 and table 6 below.
Table 3 Detailed Description of the Proposal
Proposal or Separable Portion Number
3.1 Separable Portion 1
3.2 Separable Portion 2
3.3 Separable Portion 3
3.4 Separable Portion 4
Separable Portion Description
Rising Mains & Gravity Mains
The road, rail & creeks crossing
South Bowenfels pump station & storm water pipe
South Littleton’s pump station
Details of the Separable Portion
3.1. The proposal is to: clear the line, excavate, lay, backfill, compact and reinstate - after installation of a shallow 250 to 355-NB pipeline
3.2. The proposal is to: under bore, jack or pull a 250 to 355-NB pipe though the under bore and connect to the adjoining shallow 300-NB pipeline positioned there by Separable Portion 1
3.3A. The Pump Station proposal is to build a 3-m diameter underground sewage pump station in the existing easement together with the associated connecting gravity and pressure pipes
3.3B The Storm Water proposal is to install 130-m of 900-mm diameter storm water pipe from the existing headwall - across private land, to discharge into land zoned open space, in private ownership.
3.4. The Pump Station proposal is to build: a 3-m diameter underground sewage pump station; and an emergency storage - in the existing easement together with the associated connecting gravity and pressure pipes
3/5.7
Annex A to - South Bowenfel’s Sewerage Scheme Upgrade – By Review of Environmental Factors (REF) For The Project Manager The Determining Authority
t:\a operations\bob salmon\letter drop\ref annex a to south bowenfels sewerage schemsupgrade1 sans ownership details.docx Page 2 of 38 pages 21-Aug-13
Table 4 & 5 Description of the Existing Environment & the Likely Impact of the Work Activity on the Environment
Description of the Existing Environment
Impact of the Work Activity on the Environment: (a) During construction, (b) on progress payment (c) 12 months after construction
4A Grass land with some services 5(a) Open excavation, stock piles, orange mesh/para- fencing.
5(b) Fully reinstated and seeded.
5(c) Regrowth re-established to 90-95%.
4B1 Great Western Highway - road reserve with services and obstructing trees
5(a) Trees will be removed and replaced with semi mature stock. The trench will be open excavated, stock piles created and orange mesh/para-fencing placed.
5(b) Fully reinstated and seeded.
5(c) Regrowth re-established to 90-95%.
4B2 Great Western Highway - road reserve with services but NO obstructing trees
5(a) Open excavation, stock piles, orange mesh/para- fencing.
5(b) Fully reinstated and seeded.
5(c) Regrowth re-established to 90-95%.
4C1 Town road reserve – footpath with services & obstructing trees
5(a) Trees will be removed and replaced with semi mature stock. The trench will be open excavated, stock piles created and orange mesh/para-fencing placed.
5(b) Fully reinstated and seeded.
5(c) Regrowth re-established to 90-95%.
4C2 Town Road Reserve – footpath with services but NO obstructing trees
5(a) Open excavation, stock piles, orange mesh/para- fencing.
5(b) Fully reinstated and seeded.
5(c) Regrowth re-established to 90-95%.
5(e) No discernible impact expected.
3/5.7
Annex A to - South Bowenfel’s Sewerage Scheme Upgrade – By Review of Environmental Factors (REF) For The Project Manager The Determining Authority
t:\a operations\bob salmon\letter drop\ref annex a to south bowenfels sewerage schemsupgrade1 sans ownership details.docx Page 3 of 38 pages 21-Aug-13
Table 6 Steps to be Taken to Protect the Environment including Sedimentation Control
Steps Mitigating actions
6.1 Sediment and Erosion Control
Take all steps necessary to protect the environment and in particular, comply with the requirements of this Section.
Comply with the relevant requirements of the following publications:- (i) Urban Erosion and Sediment Control Handbook (Department of Conservation and
Land Management);
(ii) Urban Erosion and Sediment Control Field Guide (Department of Land and Water Conservation);
Adopt such measures as may be necessary for erosion, contamination and sediment control, during construction, including the following, where applicable:-
(i) minimal vegetation and soil disturbance – restricted to the areas required for
construction and access;
(ii) progressive restoration of disturbed areas;
(iii) temporary drains;
(iv) temporary geotextile sediment fence and straw bales;
(v) spreader banks or other structures to disperse concentrated runoff;
(vi) construction and maintenance of silt traps to prevent the discharge of scoured
materials to downstream areas;
(vii) stockpiling waste materials away from waterways and barricaded by heavy bales or
silt curtains to prevent sediment movements.
Remove all temporary works when no longer required.
6.2 Under bore the obstructing facility
Bob Salmon, Project Engineer
Applicant’s Signature:
Date: 21-Aug-13
3/5.7
Annex A to South Bowenfel’s Sewerage Scheme Upgrade – Review of Environmental Factors (REF) By South Bowenfel’s SPS to South Littleton’s SPS For
The Project Manager The Determining Authority
t:\a operations\bob salmon\letter drop\ref annex a to south bowenfels sewerage schemsupgrade1 sans ownership details.docx
Page 4 of 38 pages 21-Aug-13
The REF MATRIX –
Refer to drawing 1102133-31 & 32
0. Pipeline Chainage (From pump station)
1. Property Details (Lot no & DP)
2. Ownership Details (Address)
3. Detailed Description of the Work Activity (See table 3 below)
4. Description of the existing environment 5. The likely Impact of the Work Activity on the Environment(See table 4 & 5 below)
6. The Existing Conditions – circa Mid to Late January 2013
-30 to 2 Lot 401 DP 1,086,154
1. 3.3A The Pump Station proposal is to build a 3-m diameter underground sewage pump station in the existing easement together with the associated connecting gravity and pressure pipes
.3B The Storm Water proposal is to install 130-m of 900-mm diameter storm water pipe from the existing headwall - across private land, to discharge into land zoned open space, in private ownership.
4A Grass land with some services.
5. (a) Open excavation, stock piles, orange mesh/para- fencing
(b) Fully reinstated and seeded
(c) Regrowth re-established to 90-95%
6.1
3/5.7
Annex A to South Bowenfel’s Sewerage Scheme Upgrade – Review of Environmental Factors (REF) By South Bowenfel’s SPS to South Littleton’s SPS For
The Project Manager The Determining Authority
t:\a operations\bob salmon\letter drop\ref annex a to south bowenfels sewerage schemsupgrade1 sans ownership details.docx
Page 5 of 38 pages 21-Aug-13
Refer to drawing 1102133-31 & 32
0. Pipeline Chainage (From pump station)
1. Property Details (Lot no & DP)
2. Ownership Details (Address)
3. Detailed Description of the Work Activity (See table 3 below)
4. Description of the existing environment 5. The likely Impact of the Work Activity on the Environment(See table 4 & 5 below)
6. The Existing Conditions – circa Mid to Late January 2013
2 to 100 Lot 1, section 1, DP 3096
2 The proposal is to: clear the line, excavate, lay, backfill, compact and reinstate after installation - a shallow 250 to 355-NB pipeline
4. Existing road surface.
5. (a) Open excavation, stock pipes, orange/para-fencing
(b) Fully reinstated and compacted
(c) Fully reinstated and compacted
6.1
100 to 180 south
Lot 1, DP 602,263
3 The proposal is to: clear the line, excavate, lay, backfill, compact and reinstate after installation - a shallow 250 to 355-NB pipeline
4A. Grass land with some services.
5. (a) Open excavation, stock piles, orange mesh/para- fencing
(b) Fully reinstated and seeded
(c) Regrowth re-established to 90-95%
6.1
3/5.7
Annex A to South Bowenfel’s Sewerage Scheme Upgrade – Review of Environmental Factors (REF) By South Bowenfel’s SPS to South Littleton’s SPS For
The Project Manager The Determining Authority
t:\a operations\bob salmon\letter drop\ref annex a to south bowenfels sewerage schemsupgrade1 sans ownership details.docx
Page 6 of 38 pages 21-Aug-13
Refer to drawing 1102133-31 & 32
0. Pipeline Chainage (From pump station)
1. Property Details (Lot no & DP)
2. Ownership Details (Address)
3. Detailed Description of the Work Activity (See table 3 below)
4. Description of the existing environment 5. The likely Impact of the Work Activity on the Environment(See table 4 & 5 below)
6. The Existing Conditions – circa Mid to Late January 2013
100 to 320 north
Lot 50, DP 1,107,410
4 The proposal is to: clear the line, excavate, lay, backfill, compact and reinstate after installation - a shallow 250 to 355-NB pipeline
4A Grass land with some services.
5. (a) Open excavation, stock piles, orange mesh/para- fencing
(b) Fully reinstated and seeded
(c) Regrowth re-established to 90-95% 6.1
180 to 320 Lot 12, DP 3096
5 The proposal is to: clear the line, excavate, lay, backfill, compact and reinstate after installation - a shallow 250 to 355-NB pipeline
4A Grass land with some services.
5. (a) Open excavation, stock piles, orange mesh/para- fencing
(b) Fully reinstated and seeded
(c) Regrowth re-established to 90-95% 6.1
3/5.7
Annex A to South Bowenfel’s Sewerage Scheme Upgrade – Review of Environmental Factors (REF) By South Bowenfel’s SPS to South Littleton’s SPS For
The Project Manager The Determining Authority
t:\a operations\bob salmon\letter drop\ref annex a to south bowenfels sewerage schemsupgrade1 sans ownership details.docx
Page 7 of 38 pages 21-Aug-13
Refer to drawing 1102133-31 & 32
0. Pipeline Chainage (From pump station)
1. Property Details (Lot no & DP)
2. Ownership Details (Address)
3. Detailed Description of the Work Activity (See table 3 below)
4. Description of the existing environment 5. The likely Impact of the Work Activity on the Environment(See table 4 & 5 below)
6. The Existing Conditions – circa Mid to Late January 2013
320 to 516 Lot 50, DP 1,107,410
6 The proposal is to: clear the line, excavate, lay, backfill, compact and reinstate after installation - a shallow 250 to 355-NB pipeline
4B2 Great Western Highway - road reserve with services but no obstructing trees.
5. (a) Open excavation, stock piles, orange mesh/para- fencing
(b) Fully reinstated and seeded
(c) Regrowth re-established to 90-95%
6.1
516 to 591 Lot 42, DP 1,016,208
7 The proposal is to: clear the line, excavate, lay, backfill, compact and reinstate after installation - a shallow 250 to 355-NB pipeline
4B2 Great Western Highway - road reserve with services but no obstructing trees.
5. (a) Open excavation, stock piles, orange mesh/para- fencing
(b) Fully reinstated and seeded
(c) Regrowth re-established to 90-95%
6.1
3/5.7
Annex A to South Bowenfel’s Sewerage Scheme Upgrade – Review of Environmental Factors (REF) By South Bowenfel’s SPS to South Littleton’s SPS For
The Project Manager The Determining Authority
t:\a operations\bob salmon\letter drop\ref annex a to south bowenfels sewerage schemsupgrade1 sans ownership details.docx
Page 8 of 38 pages 21-Aug-13
Refer to drawing 1102133-31 & 32
0. Pipeline Chainage (From pump station)
1. Property Details (Lot no & DP)
2. Ownership Details (Address)
3. Detailed Description of the Work Activity (See table 3 below)
4. Description of the existing environment 5. The likely Impact of the Work Activity on the Environment(See table 4 & 5 below)
6. The Existing Conditions – circa Mid to Late January 2013
591 to 616 Great Western Highway
8 The proposal is to: under bore, jack or pull a 250 to 355-NB pipe though the under bore and connect to the adjoining shallow 300-NB pipeline positioned there by Separable Portion 1
4B2 Great Western Highway - road reserve with services but no obstructing trees.
5. (a) Open excavation, stock piles, orange mesh/para- fencing
(b) Fully reinstated and seeded
(c) Regrowth re-established to 90-95%
6.
1
616 to 670 Great Western Highway
9 The proposal is to: clear the line, excavate, lay, backfill, compact and reinstate after installation - a shallow 250 to 355-NB pipeline; and to under bore, jack or pull a 250 to 355-NB pipe though the under bore and connect to the adjoining shallow 250 to 355-NB pipeline pre-positioned there.
4B2 Great Western Highway - road reserve with services but no obstructing trees.
5. (a) Open excavation, stock piles, orange mesh/para- fencing
(b) Fully reinstated and seeded
(c) Regrowth re-established to 90-95%
6.1
3/5.7
Annex A to South Bowenfel’s Sewerage Scheme Upgrade – Review of Environmental Factors (REF) By South Bowenfel’s SPS to South Littleton’s SPS For
The Project Manager The Determining Authority
t:\a operations\bob salmon\letter drop\ref annex a to south bowenfels sewerage schemsupgrade1 sans ownership details.docx
Page 9 of 38 pages 21-Aug-13
Refer to drawing 1102133-31 & 32
0. Pipeline Chainage (From pump station)
1. Property Details (Lot no & DP)
2. Ownership Details (Address)
3. Detailed Description of the Work Activity (See table 3 below)
4. Description of the existing environment 5. The likely Impact of the Work Activity on the Environment(See table 4 & 5 below)
6. The Existing Conditions – circa Mid to Late January 2013
617 to 649 Lot 202, DP 1,077,344
10 The proposal is to: clear the line, excavate, lay, backfill, compact and reinstate after installation - a shallow 250 to 355-NB pipeline; and to under bore, jack or pull a 250 to 355-NB pipe though the under bore and connect to the adjoining shallow 250 to 355-NB pipeline pre-positioned there.
4B2 Great Western Highway - road reserve with services but no obstructing trees.
5. (a) Open excavation, stock piles, orange mesh/para- fencing
(b) Fully reinstated and seeded
(c) Regrowth re-established to 90-95%
6.1
649 to 670 Lot 31, DP 1,011,220
11 The proposal is to: clear the line, excavate, lay, backfill, compact and reinstate after installation - a shallow 250 to 355-NB pipeline; and to under bore, jack or pull a 250 to 355-NB pipe though the under bore and connect to the adjoining shallow 250 to 355-NB pipeline pre-positioned there.
4B1 Great Western Highway - road reserve with services and obstructing trees.
5. (a) Trees will be removed and replaced with semi mature stock. The trench will be open excavated, stock piles created and orange mesh/para- fencing installed.
(b) Fully reinstated and seeded
(c) Regrowth re-established to 90-95%
6.1
3/5.7
Annex A to South Bowenfel’s Sewerage Scheme Upgrade – Review of Environmental Factors (REF) By South Bowenfel’s SPS to South Littleton’s SPS For
The Project Manager The Determining Authority
t:\a operations\bob salmon\letter drop\ref annex a to south bowenfels sewerage schemsupgrade1 sans ownership details.docx
Page 10 of 38 pages 21-Aug-13
Refer to drawing 1102133-31 & 32
0. Pipeline Chainage (From pump station)
1. Property Details (Lot no & DP)
2. Ownership Details (Address)
3. Detailed Description of the Work Activity (See table 3 below)
4. Description of the existing environment 5. The likely Impact of the Work Activity on the Environment(See table 4 & 5 below)
6. The Existing Conditions – circa Mid to Late January 2013
670 to 690 Lot 30, DP 1,011,220
12 The proposal is to: clear the line, excavate, lay, backfill, compact and reinstate after installation - a shallow 250 to 355-NB pipeline; and to under bore, jack or pull a 250 to 355-NB pipe though the under bore and connect to the adjoining shallow 250 to 355-NB pipeline pre-positioned there.
4B1 Great Western Highway - road reserve with services and obstructing trees.
5. (a) Trees will be removed and replaced with semi mature stock. The trench will be open excavated, stock piles created and orange mesh/para- fencing installed.
(b) Fully reinstated and seeded
(c) Regrowth re-established to 90-95%
6.1
690 to 710 Lot 1, DP 239,308
13
The proposal is to: clear the line, excavate, lay, backfill, compact and reinstate after installation - a shallow 250 to 355-NB pipeline; and to under bore, jack or pull a 250 to 355-NB pipe though the under bore and connect to the adjoining shallow 250 to 355-NB pipeline pre-positioned there.
4B1 Great Western Highway - road reserve with services and obstructing trees.
5. (a) Trees will be removed and replaced with semi mature stock. The trench will be open excavated, stock piles created and orange mesh/para- fencing installed.
(b) Fully reinstated and seeded 6.1
3/5.7
Annex A to South Bowenfel’s Sewerage Scheme Upgrade – Review of Environmental Factors (REF) By South Bowenfel’s SPS to South Littleton’s SPS For
The Project Manager The Determining Authority
t:\a operations\bob salmon\letter drop\ref annex a to south bowenfels sewerage schemsupgrade1 sans ownership details.docx
Page 11 of 38 pages 21-Aug-13
Refer to drawing 1102133-31 & 32
0. Pipeline Chainage (From pump station)
1. Property Details (Lot no & DP)
2. Ownership Details (Address)
3. Detailed Description of the Work Activity (See table 3 below)
4. Description of the existing environment 5. The likely Impact of the Work Activity on the Environment(See table 4 & 5 below)
6. The Existing Conditions – circa Mid to Late January 2013
(c) Regrowth re-established to 90-95%
710 to 730 Lot 2, DP 239,308
14
The proposal is to: clear the line, excavate, lay, backfill, compact and reinstate after installation - a shallow 250 to 355-NB pipeline & 3.2
4B1 Great Western Highway - road reserve with services and obstructing trees.
5. (a) Trees will be removed and replaced with semi mature stock. The trench will be open excavated, stock piles created and orange mesh/para- fencing installed.
(b) Fully reinstated and seeded
(c) Regrowth re-established to 90-95%
6.1
3/5.7
Annex A to South Bowenfel’s Sewerage Scheme Upgrade – Review of Environmental Factors (REF) By South Bowenfel’s SPS to South Littleton’s SPS For
The Project Manager The Determining Authority
t:\a operations\bob salmon\letter drop\ref annex a to south bowenfels sewerage schemsupgrade1 sans ownership details.docx
Page 12 of 38 pages 21-Aug-13
Refer to drawing 1102133-31 & 32
0. Pipeline Chainage (From pump station)
1. Property Details (Lot no & DP)
2. Ownership Details (Address)
3. Detailed Description of the Work Activity (See table 3 below)
4. Description of the existing environment 5. The likely Impact of the Work Activity on the Environment(See table 4 & 5 below)
6. The Existing Conditions – circa Mid to Late January 2013
730 to 750 Road reserve
15 The proposal is to: under bore, jack or pull a 250 to 355-NB pipe though the under bore and connect to the adjoining shallow 300-NB pipeline positioned there by Separable Portion 1
4B2 Great Western Highway - road reserve with services but no obstructing trees
6.2 Re-photo
750 to 772 Lot 3, DP 239,308
16
The proposal is to: clear the line, excavate, lay, backfill, compact and reinstate after installation - a shallow 250 to 355-NB pipeline; and to under bore, jack or pull a 250 to 355-NB pipe though the under bore and connect to the adjoining shallow 250 to 355-NB pipeline pre-positioned there.
4B1 Great Western Highway - road reserve with services and obstructing trees.
5. (a) Trees will be removed and replaced with semi mature stock. The trench will be open excavated, stock piles created and orange mesh/para- fencing installed.
(b) Fully reinstated and seeded
(c) Regrowth re-established to 90-95%
6.1
3/5.7
Annex A to South Bowenfel’s Sewerage Scheme Upgrade – Review of Environmental Factors (REF) By South Bowenfel’s SPS to South Littleton’s SPS For
The Project Manager The Determining Authority
t:\a operations\bob salmon\letter drop\ref annex a to south bowenfels sewerage schemsupgrade1 sans ownership details.docx
Page 13 of 38 pages 21-Aug-13
Refer to drawing 1102133-31 & 32
0. Pipeline Chainage (From pump station)
1. Property Details (Lot no & DP)
2. Ownership Details (Address)
3. Detailed Description of the Work Activity (See table 3 below)
4. Description of the existing environment 5. The likely Impact of the Work Activity on the Environment(See table 4 & 5 below)
6. The Existing Conditions – circa Mid to Late January 2013
772 to 795 Lot 6, DP776,529
17 The proposal is to: clear the line, excavate, lay, backfill, compact and reinstate after installation - a shallow 250 to 355-NB pipeline; and to under bore, jack or pull a 250 to 355-NB pipe though the under bore and connect to the adjoining shallow 250 to 355-NB pipeline pre-positioned there.
4B1 Great Western Highway - road reserve with services and obstructing trees.
5. (a) Trees will be removed and replaced with semi mature stock. The trench will be open excavated, stock piles created and orange mesh/para- fencing installed.
(b) Fully reinstated and seeded
(c) Regrowth re-established to 90-95%
6.1 Re Phot
795 to 827 Lot B, DP 345,053
18 The proposal is to: clear the line, excavate, lay, backfill, compact and reinstate after installation - a shallow 250 to 355-NB pipeline & 3.2
4B1 Great Western Highway - road reserve with services and obstructing trees.
5. (a) Trees will be removed and replaced with semi mature stock. The trench will be open excavated, stock piles created and orange mesh/para- fencing installed.
(b) Fully reinstated and seeded
6.1
3/5.7
Annex A to South Bowenfel’s Sewerage Scheme Upgrade – Review of Environmental Factors (REF) By South Bowenfel’s SPS to South Littleton’s SPS For
The Project Manager The Determining Authority
t:\a operations\bob salmon\letter drop\ref annex a to south bowenfels sewerage schemsupgrade1 sans ownership details.docx
Page 14 of 38 pages 21-Aug-13
Refer to drawing 1102133-31 & 32
0. Pipeline Chainage (From pump station)
1. Property Details (Lot no & DP)
2. Ownership Details (Address)
3. Detailed Description of the Work Activity (See table 3 below)
4. Description of the existing environment 5. The likely Impact of the Work Activity on the Environment(See table 4 & 5 below)
6. The Existing Conditions – circa Mid to Late January 2013
(c) Regrowth re-established to 90-95%
827 to 850 Lot A, DP 345,053
19 The proposal is to: clear the line, excavate, lay, backfill, compact and reinstate after installation - a shallow 250 to 355-NB pipeline; and to under bore, jack or pull a 250 to 355-NB pipe though the under bore and connect to the adjoining shallow 250 to 355-NB pipeline pre-positioned there.
4B1 Great Western Highway - road reserve with services and obstructing trees.
5. (a) Trees will be removed and replaced with semi mature stock. The trench will be open excavated, stock piles created and orange mesh/para- fencing installed.
b) Fully reinstated and seeded
(c) Regrowth re-established to 90-95%
6.1
3/5.7
Annex A to South Bowenfel’s Sewerage Scheme Upgrade – Review of Environmental Factors (REF) By South Bowenfel’s SPS to South Littleton’s SPS For
The Project Manager The Determining Authority
t:\a operations\bob salmon\letter drop\ref annex a to south bowenfels sewerage schemsupgrade1 sans ownership details.docx
Page 15 of 38 pages 21-Aug-13
Refer to drawing 1102133-31 & 32
0. Pipeline Chainage (From pump station)
1. Property Details (Lot no & DP)
2. Ownership Details (Address)
3. Detailed Description of the Work Activity (See table 3 below)
4. Description of the existing environment 5. The likely Impact of the Work Activity on the Environment(See table 4 & 5 below)
6. The Existing Conditions – circa Mid to Late January 2013
850 to 902 Lot 3, DP 2,288
20 The proposal is to: clear the line, excavate, lay, backfill, compact and reinstate after installation - a shallow 250 to 355-NB pipeline; and to under bore, jack or pull a 250 to 355-NB pipe though the under bore and connect to the adjoining shallow 250 to 355-NB pipeline pre-positioned there.
4B1 Great Western Highway - road reserve with services and obstructing trees.
5.(a) Trees will be removed and replaced with semi mature stock. The trench will be open excavated, stock piles created and orange mesh/para- fencing installed.
b) Fully reinstated and seeded
(c) Regrowth re-established to 90-95%
6.1
3/5.7
Annex A to South Bowenfel’s Sewerage Scheme Upgrade – Review of Environmental Factors (REF) By South Bowenfel’s SPS to South Littleton’s SPS For
The Project Manager The Determining Authority
t:\a operations\bob salmon\letter drop\ref annex a to south bowenfels sewerage schemsupgrade1 sans ownership details.docx
Page 16 of 38 pages 21-Aug-13
Refer to drawing 1102133-31 & 32
0. Pipeline Chainage (From pump station)
1. Property Details (Lot no & DP)
2. Ownership Details (Address)
3. Detailed Description of the Work Activity (See table 3 below)
4. Description of the existing environment 5. The likely Impact of the Work Activity on the Environment(See table 4 & 5 below)
6. The Existing Conditions – circa Mid to Late January 2013
902 to 950 Lot 2, ,DP 2,288
21 The proposal is to: clear the line, excavate, lay, backfill, compact and reinstate after installation - a shallow 250 to 355-NB pipeline; and to under bore, jack or pull a 250 to 355-NB pipe though the under bore and connect to the adjoining shallow 250 to 355-NB pipeline pre-positioned there.
4B1 Great Western Highway - road reserve with services and obstructing trees.
5.(a) Trees will be removed and replaced with semi mature stock. The trench will be open excavated, stock piles created and orange mesh/para- fencing installed.
(b) Fully reinstated and seeded
(c) Regrowth re-established to 90-95%
6.1
3/5.7
Annex A to South Bowenfel’s Sewerage Scheme Upgrade – Review of Environmental Factors (REF) By South Bowenfel’s SPS to South Littleton’s SPS For
The Project Manager The Determining Authority
t:\a operations\bob salmon\letter drop\ref annex a to south bowenfels sewerage schemsupgrade1 sans ownership details.docx
Page 17 of 38 pages 21-Aug-13
Refer to drawing 1102133-31 & 32
0. Pipeline Chainage (From pump station)
1. Property Details (Lot no & DP)
2. Ownership Details (Address)
3. Detailed Description of the Work Activity (See table 3 below)
4. Description of the existing environment 5. The likely Impact of the Work Activity on the Environment(See table 4 & 5 below)
6. The Existing Conditions – circa Mid to Late January 2013
950 to 1010 Lot 1, DP 780, 087
22 The proposal is to: clear the line, excavate, lay, backfill, compact and reinstate after installation - a shallow 250 to 355-NB pipeline; and to under bore, jack or pull a 250 to 355-NB pipe though the under bore and connect to the adjoining shallow 250 to 355-NB pipeline pre-positioned there.
4B1 Great Western Highway - road reserve with services and obstructing trees.
5.(a) Trees will be removed and replaced with semi mature stock. The trench will be open excavated, stock piles created and orange mesh/para- fencing installed.
(b) Fully reinstated and seeded
(c) Regrowth re-established to 90-95%
6.1
3/5.7
Annex A to South Bowenfel’s Sewerage Scheme Upgrade – Review of Environmental Factors (REF) By South Bowenfel’s SPS to South Littleton’s SPS For
The Project Manager The Determining Authority
t:\a operations\bob salmon\letter drop\ref annex a to south bowenfels sewerage schemsupgrade1 sans ownership details.docx
Page 18 of 38 pages 21-Aug-13
Refer to drawing 1102133-31 & 32
0. Pipeline Chainage (From pump station)
1. Property Details (Lot no & DP)
2. Ownership Details (Address)
3. Detailed Description of the Work Activity (See table 3 below)
4. Description of the existing environment 5. The likely Impact of the Work Activity on the Environment(See table 4 & 5 below)
6. The Existing Conditions – circa Mid to Late January 2013
1010 to 1030
Lot 1, DP 594, 343
23 The proposal is to: clear the line, excavate, lay, backfill, compact and reinstate after installation - a shallow 250 to 355-NB pipeline; and to under bore, jack or pull a 250 to 355-NB pipe though the under bore and connect to the adjoining shallow 250 to 355-NB pipeline pre-positioned there.
4B1 Great Western Highway - road reserve with services and obstructing trees.
5.(a) Trees will be removed and replaced with semi mature stock. The trench will be open excavated, stock piles created and orange mesh/para- fencing installed.
(b) Fully reinstated and seeded
(c) Regrowth re-established to 90-95%
6.1
3/5.7
Annex A to South Bowenfel’s Sewerage Scheme Upgrade – Review of Environmental Factors (REF) By South Bowenfel’s SPS to South Littleton’s SPS For
The Project Manager The Determining Authority
t:\a operations\bob salmon\letter drop\ref annex a to south bowenfels sewerage schemsupgrade1 sans ownership details.docx
Page 19 of 38 pages 21-Aug-13
Refer to drawing 1102133-31 & 32
0. Pipeline Chainage (From pump station)
1. Property Details (Lot no & DP)
2. Ownership Details (Address)
3. Detailed Description of the Work Activity (See table 3 below)
4. Description of the existing environment 5. The likely Impact of the Work Activity on the Environment(See table 4 & 5 below)
6. The Existing Conditions – circa Mid to Late January 2013
1030 to 1081
Lot 2, DP 524,479
24 The proposal is to: clear the line, excavate, lay, backfill, compact and reinstate after installation - a shallow 250 to 355-NB pipeline; and to under bore, jack or pull a 250 to 355-NB pipe though the under bore and connect to the adjoining shallow 250 to 355-NB pipeline pre-positioned there.
4B1 Great Western Highway - road reserve with services and obstructing trees.
5.(a) Trees will be removed and replaced with semi mature stock. The trench will be open excavated, stock piles created and orange mesh/para- fencing installed.
(b) Fully reinstated and seeded
(c) Regrowth re-established to 90-95%
6.1
1081 to 1120
Lot 1, DP 524,479
25 The proposal is to: clear the line, excavate, lay, backfill, compact and reinstate after installation - a shallow 250 to 355-NB pipeline & 3.2
4B1 Great Western Highway - road reserve with services and obstructing trees.
5.(a) Trees will be removed and replaced with semi mature stock. The trench will be open excavated, stock piles created and orange mesh/para- fencing installed.
(b) Fully reinstated and seeded
6.1
3/5.7
Annex A to South Bowenfel’s Sewerage Scheme Upgrade – Review of Environmental Factors (REF) By South Bowenfel’s SPS to South Littleton’s SPS For
The Project Manager The Determining Authority
t:\a operations\bob salmon\letter drop\ref annex a to south bowenfels sewerage schemsupgrade1 sans ownership details.docx
Page 20 of 38 pages 21-Aug-13
Refer to drawing 1102133-31 & 32
0. Pipeline Chainage (From pump station)
1. Property Details (Lot no & DP)
2. Ownership Details (Address)
3. Detailed Description of the Work Activity (See table 3 below)
4. Description of the existing environment 5. The likely Impact of the Work Activity on the Environment(See table 4 & 5 below)
6. The Existing Conditions – circa Mid to Late January 2013
(c) Regrowth re-established to 90-95%
1120 to 1137
Road reserve
26 The proposal is to: clear the line, excavate, lay, backfill, compact and reinstate after installation - a shallow 250 to 355-NB pipeline; and to under bore, jack or pull a 250 to 355-NB pipe though the under bore and connect to the adjoining shallow 250 to 355-NB pipeline pre-positioned there.
4B1 Great Western Highway - road reserve with services and obstructing trees.
5.(a) Trees will be removed and replaced with semi mature stock. The trench will be open excavated, stock piles created and orange mesh/para- fencing installed.
(b) Fully reinstated and seeded
(c) Regrowth re-established to 90-95%
6.2
3/5.7
Annex A to South Bowenfel’s Sewerage Scheme Upgrade – Review of Environmental Factors (REF) By South Bowenfel’s SPS to South Littleton’s SPS For
The Project Manager The Determining Authority
t:\a operations\bob salmon\letter drop\ref annex a to south bowenfels sewerage schemsupgrade1 sans ownership details.docx
Page 21 of 38 pages 21-Aug-13
Refer to drawing 1102133-31 & 32
0. Pipeline Chainage (From pump station)
1. Property Details (Lot no & DP)
2. Ownership Details (Address)
3. Detailed Description of the Work Activity (See table 3 below)
4. Description of the existing environment 5. The likely Impact of the Work Activity on the Environment(See table 4 & 5 below)
6. The Existing Conditions – circa Mid to Late January 2013
1137 to 1180
Lot 3, DP 28,254
27 The proposal is to: clear the line, excavate, lay, backfill, compact and reinstate after installation - a shallow 250 to 355-NB pipeline;
4B1 Great Western Highway - road reserve with services and obstructing trees.
5.(a) Trees will be removed and replaced with semi mature stock. The trench will be open excavated, stock piles created and orange mesh/para- fencing installed.
(b) Fully reinstated and seeded
(c) Regrowth re-established to 90-95%
6.1
670 to 827 Great Western Highway
28 The proposal is to: clear the line, excavate, lay, backfill, compact and reinstate after installation – of a shallow 250 to 355-NB pipeline; and to under bore, jack or pull a 250 to 355-NB pipe though the under bore and connect to the adjoining shallow 250 to 355-NB pipeline pre-positioned there.
4B1 Great Western Highway - road reserve with services and obstructing trees.
5.(a) Trees will be removed and replaced with semi mature stock. The trench will be open excavated, stock piles created and orange mesh/para- fencing installed.
(b) Fully reinstated and seeded
6.1 See photos at the intermediate chainages above.
3/5.7
Annex A to South Bowenfel’s Sewerage Scheme Upgrade – Review of Environmental Factors (REF) By South Bowenfel’s SPS to South Littleton’s SPS For
The Project Manager The Determining Authority
t:\a operations\bob salmon\letter drop\ref annex a to south bowenfels sewerage schemsupgrade1 sans ownership details.docx
Page 22 of 38 pages 21-Aug-13
Refer to drawing 1102133-31 & 32
0. Pipeline Chainage (From pump station)
1. Property Details (Lot no & DP)
2. Ownership Details (Address)
3. Detailed Description of the Work Activity (See table 3 below)
4. Description of the existing environment 5. The likely Impact of the Work Activity on the Environment(See table 4 & 5 below)
6. The Existing Conditions – circa Mid to Late January 2013
(c) Regrowth re-established to 90-95%
827 to 1080 Great Western Highway
29 The proposal is to: clear the line, excavate, lay, backfill, compact and reinstate after installation - a shallow 250 to 355-NB pipeline; and to under bore, jack or pull a 250 to 355-NB pipe though the under bore and connect to the adjoining shallow 250 to 355-NB pipeline pre-positioned there.
4B1 Great Western Highway - road reserve with services and obstructing trees.
5.(a) Trees will be removed and replaced with semi mature stock. The trench will be open excavated, stock piles created and orange mesh/para- fencing installed.
(b) Fully reinstated and seeded
(c) Regrowth re-established to 90-95%
6.16.1 See photos at the intermediate chainages above.
3/5.7
Annex A to South Bowenfel’s Sewerage Scheme Upgrade – Review of Environmental Factors (REF) By South Bowenfel’s SPS to South Littleton’s SPS For
The Project Manager The Determining Authority
t:\a operations\bob salmon\letter drop\ref annex a to south bowenfels sewerage schemsupgrade1 sans ownership details.docx
Page 23 of 38 pages 21-Aug-13
Refer to drawing 1102133-31 & 32
0. Pipeline Chainage (From pump station)
1. Property Details (Lot no & DP)
2. Ownership Details (Address)
3. Detailed Description of the Work Activity (See table 3 below)
4. Description of the existing environment 5. The likely Impact of the Work Activity on the Environment(See table 4 & 5 below)
6. The Existing Conditions – circa Mid to Late January 2013
1080 to 1120
LCC 30 3.2. The proposal is to: under bore, jack or pull a 250 to 355-NB pipe though the under bore and connect to the adjoining shallow 300-NB pipeline positioned there by
4B2 Great Western Highway - road reserve with services but no obstructing trees.
5. (a) Open excavation, stock piles, orange mesh/para- fencing
(b) Fully reinstated and seeded
(c) Regrowth re-established to 90-95%
6.1
1120 to 1220
Great Western Highway
31 3.1. The proposal is to: clear the line, excavate, lay, backfill, compact and reinstate after installation of a shallow 250 to 355-NB pipeline
4C1 Town road reserve – footpath with services & obstructing trees
5. (a) Trees will be removed and replaced with semi mature stock. The trench will be open excavated, stock piles created and orange mesh/para- fencing installed.
(b) Fully reinstated and seeded
(c) Regrowth re-established to 90-95%
6.1
3/5.7
Annex A to South Bowenfel’s Sewerage Scheme Upgrade – Review of Environmental Factors (REF) By South Bowenfel’s SPS to South Littleton’s SPS For
The Project Manager The Determining Authority
t:\a operations\bob salmon\letter drop\ref annex a to south bowenfels sewerage schemsupgrade1 sans ownership details.docx
Page 24 of 38 pages 21-Aug-13
Refer to drawing 1102133-31 & 32
0. Pipeline Chainage (From pump station)
1. Property Details (Lot no & DP)
2. Ownership Details (Address)
3. Detailed Description of the Work Activity (See table 3 below)
4. Description of the existing environment 5. The likely Impact of the Work Activity on the Environment(See table 4 & 5 below)
6. The Existing Conditions – circa Mid to Late January 2013
3/5.7
Annex A to South Bowenfel’s Sewerage Scheme Upgrade – Review of Environmental Factors (REF) By South Littleton’s SPS to Sewage Pump Station No 1 (SPS No 1) For
The Project Manager The Determining Authority
t:\a operations\bob salmon\letter drop\ref annex a to south bowenfels sewerage schemsupgrade1 sans ownership details.docx
Page 25 of 38 pages 21-Aug-13
The REF MATRIX –
Refer to drawing 1102133-61 to 64
0. Pipeline Chainage (From Pump Station)
1. Property Details (Lot No & DP)
2. Ownership Details (Address)
3. Detailed Description of Proposal (See table 3 above)
4. Description of the existing environment 5. The likely Impact of the Development on the Environment (See table 4 & 5 above)
6. What Steps will be taken to Protect the Environment (See table 6 above)
00.0 to 20.8 Lot 321, DP 1,142,036
32 3.1. The proposal is to: clear the line, excavate, lay, backfill, compact and reinstate after installation of a shallow 250 to 355-NB pipeline
4C1 Town road reserve – footpath with services & obstructing trees
5(a) Trees will be removed and replaced with semi mature stock. The trench will be open excavated, stock piles created and orange mesh/para-fencing placed.
5(b) Fully reinstated and seeded
5(c) Regrowth re-established to 90-95%
3/5.7
Annex A to South Bowenfel’s Sewerage Scheme Upgrade – Review of Environmental Factors (REF) By South Littleton’s SPS to Sewage Pump Station No 1 (SPS No 1) For
The Project Manager The Determining Authority
t:\a operations\bob salmon\letter drop\ref annex a to south bowenfels sewerage schemsupgrade1 sans ownership details.docx
Page 26 of 38 pages 21-Aug-13
Refer to drawing 1102133-61 to 64
0. Pipeline Chainage (From Pump Station)
1. Property Details (Lot No & DP)
2. Ownership Details (Address)
3. Detailed Description of Proposal (See table 3 above)
4. Description of the existing environment 5. The likely Impact of the Development on the Environment (See table 4 & 5 above)
6. What Steps will be taken to Protect the Environment (See table 6 above)
20.8 to 118.0
Great Western Highway, classified - arterial
33 3.1. The proposal is to: clear the line, excavate, lay, backfill, compact and reinstate after installation of a shallow 250 to 355-NB pipeline
4B1 Great Western Highway - road reserve with services and obstructing trees
5(a) Trees will be removed and replaced with semi mature stock. The trench will be open excavated, stock piles created and orange mesh/para-fencing placed.
5(b) Fully reinstated and seeded
5(c) Regrowth re-established to 90-95%
90 to 235 Great Western Highway, classified - arterial
34 3.1. The proposal is to: clear the line, excavate, lay, backfill, compact and reinstate after installation of a shallow 250 to 355-NB pipeline
4B1 Great Western Highway - road reserve with services and obstructing trees
5(a) Trees will be removed and replaced with semi mature stock. The trench will be open excavated, stock piles created and orange mesh/para-fencing placed.
5(b) Fully reinstated and seeded
3/5.7
Annex A to South Bowenfel’s Sewerage Scheme Upgrade – Review of Environmental Factors (REF) By South Littleton’s SPS to Sewage Pump Station No 1 (SPS No 1) For
The Project Manager The Determining Authority
t:\a operations\bob salmon\letter drop\ref annex a to south bowenfels sewerage schemsupgrade1 sans ownership details.docx
Page 27 of 38 pages 21-Aug-13
Refer to drawing 1102133-61 to 64
0. Pipeline Chainage (From Pump Station)
1. Property Details (Lot No & DP)
2. Ownership Details (Address)
3. Detailed Description of Proposal (See table 3 above)
4. Description of the existing environment 5. The likely Impact of the Development on the Environment (See table 4 & 5 above)
6. What Steps will be taken to Protect the Environment (See table 6 above)
5(c) Regrowth re-established to 90-95%
175 to 270 Great Western Highway, classified - arterial
35 3.2. The proposal is to: under bore, jack or pull a 250 to 355-NB pipe though the under bore and connect to the adjoining shallow 300-NB pipeline positioned there by Separable Portion 1
4B1 Great Western Highway - road reserve with services and obstructing trees
5(e) No discernible impact expected
6.1.
6.2 Under bore the obstructing feature
3/5.7
Annex A to South Bowenfel’s Sewerage Scheme Upgrade – Review of Environmental Factors (REF) By South Littleton’s SPS to Sewage Pump Station No 1 (SPS No 1) For
The Project Manager The Determining Authority
t:\a operations\bob salmon\letter drop\ref annex a to south bowenfels sewerage schemsupgrade1 sans ownership details.docx
Page 28 of 38 pages 21-Aug-13
Refer to drawing 1102133-61 to 64
0. Pipeline Chainage (From Pump Station)
1. Property Details (Lot No & DP)
2. Ownership Details (Address)
3. Detailed Description of Proposal (See table 3 above)
4. Description of the existing environment 5. The likely Impact of the Development on the Environment (See table 4 & 5 above)
6. What Steps will be taken to Protect the Environment (See table 6 above)
118 to 175 Great Western Highway, classified - arterial
36 3.1. The proposal is to: clear the line, excavate, lay, backfill, compact and reinstate after installation of a shallow 250 to 355-NB pipeline
4B1. Great Western Highway - road reserve with services and obstructing trees
5(a) Trees will be removed and replaced with semi mature stock. The trench will be open excavated, stock piles created and orange mesh/para-fencing placed.
5(b) Fully reinstated and seeded
5(c) Regrowth re-established to 90-95%
270 to 470 Great Western Highway, classified - arterial
37 3.1. The proposal is to: clear the line, excavate, lay, backfill, compact and reinstate after installation of a shallow 250 to 355-NB pipeline
4C2 Town Road Reserve – footpath with services but no obstructing trees
5(a) Open excavation, stock piles, orange mesh/para- fencing
5(b) Fully reinstated and seeded
5(c) Regrowth re-established to 90-95%%
3/5.7
Annex A to South Bowenfel’s Sewerage Scheme Upgrade – Review of Environmental Factors (REF) By South Littleton’s SPS to Sewage Pump Station No 1 (SPS No 1) For
The Project Manager The Determining Authority
t:\a operations\bob salmon\letter drop\ref annex a to south bowenfels sewerage schemsupgrade1 sans ownership details.docx
Page 29 of 38 pages 21-Aug-13
Refer to drawing 1102133-61 to 64
0. Pipeline Chainage (From Pump Station)
1. Property Details (Lot No & DP)
2. Ownership Details (Address)
3. Detailed Description of Proposal (See table 3 above)
4. Description of the existing environment 5. The likely Impact of the Development on the Environment (See table 4 & 5 above)
6. What Steps will be taken to Protect the Environment (See table 6 above)
470 to 544 Great Western Highway, classified - arterial
38 3.1. The proposal is to: clear the line, excavate, lay, backfill, compact and reinstate after installation of a shallow 250 to 355-NB pipeline
4C2 Town Road Reserve – footpath with services but no obstructing trees
5(a) Open excavation, stock piles, orange mesh/para- fencing
5(b) Fully reinstated and seeded
5(c) Regrowth re-established to 90-95%
544 to708 Lot 2, DP 575,137
39 3.1. The proposal is to: clear the line, excavate, lay, backfill, compact and reinstate after installation of a shallow 250 to 355-NB pipeline
4C2 Town Road Reserve – footpath with services but no obstructing trees
5(a) Open excavation, stock piles, orange mesh/para- fencing
5(b) Fully reinstated and seeded
5(c) Regrowth re-established to 90-95%
3/5.7
Annex A to South Bowenfel’s Sewerage Scheme Upgrade – Review of Environmental Factors (REF) By South Littleton’s SPS to Sewage Pump Station No 1 (SPS No 1) For
The Project Manager The Determining Authority
t:\a operations\bob salmon\letter drop\ref annex a to south bowenfels sewerage schemsupgrade1 sans ownership details.docx
Page 30 of 38 pages 21-Aug-13
Refer to drawing 1102133-61 to 64
0. Pipeline Chainage (From Pump Station)
1. Property Details (Lot No & DP)
2. Ownership Details (Address)
3. Detailed Description of Proposal (See table 3 above)
4. Description of the existing environment 5. The likely Impact of the Development on the Environment (See table 4 & 5 above)
6. What Steps will be taken to Protect the Environment (See table 6 above)
708 to 825 Lot 2, DP 575,137
40 3.1. The proposal is to: clear the line, excavate, lay, backfill, compact and reinstate after installation of a shallow 250 to 355-NB pipeline
4C2 Endeavour Park Reserve – footpath with services but no obstructing trees
5(a) Open excavation, stock piles, orange mesh/para- fencing
5(b) Fully reinstated and seeded
5(c) Regrowth re-established to 90-95%
830 to 960 Lot 13, DP 231,890
41 3.1. The proposal is to: clear the line, excavate, lay, backfill, compact and reinstate after installation of a shallow 250 to 355-NB pipeline
4C2 Endeavour Park Reserve – footpath with services but no obstructing trees
5(a) Open excavation, stock piles, orange mesh/para- fencing
5(b) Fully reinstated and seeded
5(c) Regrowth re-established to 90-95%
3/5.7
Annex A to South Bowenfel’s Sewerage Scheme Upgrade – Review of Environmental Factors (REF) By South Littleton’s SPS to Sewage Pump Station No 1 (SPS No 1) For
The Project Manager The Determining Authority
t:\a operations\bob salmon\letter drop\ref annex a to south bowenfels sewerage schemsupgrade1 sans ownership details.docx
Page 31 of 38 pages 21-Aug-13
Refer to drawing 1102133-61 to 64
0. Pipeline Chainage (From Pump Station)
1. Property Details (Lot No & DP)
2. Ownership Details (Address)
3. Detailed Description of Proposal (See table 3 above)
4. Description of the existing environment 5. The likely Impact of the Development on the Environment (See table 4 & 5 above)
6. What Steps will be taken to Protect the Environment (See table 6 above)
960 to 1077 Lot 23, DP 245,671
42 3.1. The proposal is to: clear the line, excavate, lay, backfill, compact and reinstate after installation of a shallow 250 to 355-NB pipeline
4C2 Town Road Reserve – footpath with services but no obstructing trees
5(a) Open excavation, stock piles, orange mesh/para- fencing
5(b) Fully reinstated and seeded
5(c) Regrowth re-established to 90-95%
1077 to 1257
Lot 4, DP 231,516
43 3.1. The proposal is to: clear the line, excavate, lay, backfill, compact and reinstate after installation of a deeper 250 to 355-NB pipeline
4C2 Town Road Reserve – footpath with services but no obstructing trees
3/5.7
Annex A to South Bowenfel’s Sewerage Scheme Upgrade – Review of Environmental Factors (REF) By South Littleton’s SPS to Sewage Pump Station No 1 (SPS No 1) For
The Project Manager The Determining Authority
t:\a operations\bob salmon\letter drop\ref annex a to south bowenfels sewerage schemsupgrade1 sans ownership details.docx
Page 32 of 38 pages 21-Aug-13
Refer to drawing 1102133-61 to 64
0. Pipeline Chainage (From Pump Station)
1. Property Details (Lot No & DP)
2. Ownership Details (Address)
3. Detailed Description of Proposal (See table 3 above)
4. Description of the existing environment 5. The likely Impact of the Development on the Environment (See table 4 & 5 above)
6. What Steps will be taken to Protect the Environment (See table 6 above)
1257 to 1327
Lot 45, DP 247,845
44 3.1. The proposal is to: clear the line, excavate, lay, backfill, compact and reinstate after installation of a deeper 250 to 355-NB pipeline
4C2 Town Road Reserve – footpath with services but no obstructing trees
1327 to 1438
Lot 256,
DP 9,370
45 3.1. The proposal is to: clear the line, excavate, lay, backfill, compact and reinstate after installation of a shallow 250 to 355-NB pipeline
4C1 Town road reserve – footpath with services & obstructing trees
5(a) Trees will be removed and replaced with semi mature stock. The trench will be open excavated, stock piles created and orange mesh/para-fencing placed.
5(b) Fully reinstated and seeded
5(c) Regrowth re-established to 90-95%
3/5.7
Annex A to South Bowenfel’s Sewerage Scheme Upgrade – Review of Environmental Factors (REF) By South Littleton’s SPS to Sewage Pump Station No 1 (SPS No 1) For
The Project Manager The Determining Authority
t:\a operations\bob salmon\letter drop\ref annex a to south bowenfels sewerage schemsupgrade1 sans ownership details.docx
Page 33 of 38 pages 21-Aug-13
Refer to drawing 1102133-61 to 64
0. Pipeline Chainage (From Pump Station)
1. Property Details (Lot No & DP)
2. Ownership Details (Address)
3. Detailed Description of Proposal (See table 3 above)
4. Description of the existing environment 5. The likely Impact of the Development on the Environment (See table 4 & 5 above)
6. What Steps will be taken to Protect the Environment (See table 6 above)
1438 to 1661
Lot 774 & 775, DP 24,785
46 3.1. The proposal is to: clear the line, excavate, lay, backfill, compact and reinstate after installation of a shallow 250 to 355-NB pipeline
4C2 Town Road Reserve – footpath with services but no obstructing trees
5(a) Open excavation, stock piles, orange mesh/para- fencing
5(b) Fully reinstated and seeded
5(c) Regrowth re-established to 90-95%
1661 to 1840
Lot 292, DP 9,370
47 3.1. The proposal is to: clear the line, excavate, lay, backfill, compact and reinstate after installation of a shallow 250 to 355-NB pipeline
4C2 Town Road Reserve – footpath with services but no obstructing trees
5(a) Open excavation, stock piles, orange mesh/para- fencing
5(b) Fully reinstated and seeded
5(c) Regrowth re-established to 90-95%
3/5.7
Annex A to South Bowenfel’s Sewerage Scheme Upgrade – Review of Environmental Factors (REF) By South Littleton’s SPS to Sewage Pump Station No 1 (SPS No 1) For
The Project Manager The Determining Authority
t:\a operations\bob salmon\letter drop\ref annex a to south bowenfels sewerage schemsupgrade1 sans ownership details.docx
Page 34 of 38 pages 21-Aug-13
Refer to drawing 1102133-61 to 64
0. Pipeline Chainage (From Pump Station)
1. Property Details (Lot No & DP)
2. Ownership Details (Address)
3. Detailed Description of Proposal (See table 3 above)
4. Description of the existing environment 5. The likely Impact of the Development on the Environment (See table 4 & 5 above)
6. What Steps will be taken to Protect the Environment (See table 6 above)
1840 to 1943
Lot 113 & 353, DP 9,370
48 3.1. The proposal is to: clear the line, excavate, lay, backfill, compact and reinstate after installation of a deeper 250 to 355-NB pipeline
4C2 Town Road Reserve – footpath with services but no obstructing trees
1914 to 1952
Lot 353, DP 9,370
49 3.2. The proposal is to: under bore, jack or pull a 250 to 355-NB pipe though the under bore and connect to the adjoining shallow 300-NB pipeline positioned there by Separable
5(a) Trees will be removed and replaced with semi mature stock. The trench will be open excavated, stock piles created and orange mesh/para-fencing placed.
5(b) Fully reinstated and seeded
5(c) Regrowth re-established to 90-95%
3/5.7
Annex A to South Bowenfel’s Sewerage Scheme Upgrade – Review of Environmental Factors (REF) By South Littleton’s SPS to Sewage Pump Station No 1 (SPS No 1) For
The Project Manager The Determining Authority
t:\a operations\bob salmon\letter drop\ref annex a to south bowenfels sewerage schemsupgrade1 sans ownership details.docx
Page 35 of 38 pages 21-Aug-13
Refer to drawing 1102133-61 to 64
0. Pipeline Chainage (From Pump Station)
1. Property Details (Lot No & DP)
2. Ownership Details (Address)
3. Detailed Description of Proposal (See table 3 above)
4. Description of the existing environment 5. The likely Impact of the Development on the Environment (See table 4 & 5 above)
6. What Steps will be taken to Protect the Environment (See table 6 above)
2001 to 1952
50 3.2. The proposal is to: under bore, jack or pull a 250 to 355-NB pipe though the under bore and connect to the adjoining shallow 300-NB pipeline positioned there by Separable
5(e) No discernible impact expected
2001 to 2045
Lot 2, DP 229,883
51 3.2. The proposal is to: under bore, jack or pull a 250 to 355-NB pipe though the under bore and connect to the adjoining shallow 300-NB pipeline positioned there by Separable
5(e) No discernible impact expected
3/5.7
Annex A to South Bowenfel’s Sewerage Scheme Upgrade – Review of Environmental Factors (REF) By South Littleton’s SPS to Sewage Pump Station No 1 (SPS No 1) For
The Project Manager The Determining Authority
t:\a operations\bob salmon\letter drop\ref annex a to south bowenfels sewerage schemsupgrade1 sans ownership details.docx
Page 36 of 38 pages 21-Aug-13
Refer to drawing 1102133-61 to 64
0. Pipeline Chainage (From Pump Station)
1. Property Details (Lot No & DP)
2. Ownership Details (Address)
3. Detailed Description of Proposal (See table 3 above)
4. Description of the existing environment 5. The likely Impact of the Development on the Environment (See table 4 & 5 above)
6. What Steps will be taken to Protect the Environment (See table 6 above)
2300 to 2169
Lot 2, DP 229,883
52 3.1. The proposal is to: clear the line, excavate, lay, backfill, compact and reinstate after installation of a deeper 250 to 355-NB pipeline
4A Grass land with some services
5(a) Open excavation, stock piles, orange mesh/para- fencing
5(b) Fully reinstated and seeded
5(c) Regrowth re-established to 90-95%
2003 to 2303
Lot 2, DP 229,883
53 3.1. The proposal is to: clear the line, excavate, lay, backfill, compact and reinstate after installation of a deeper 250 to 355-NB pipeline
4A Grass land with some services
5(a) Open excavation, stock piles, orange mesh/para- fencing
5(b) Fully reinstated and seeded
5(c) Regrowth re-established to 90-95%
3/5.7
Annex A to South Bowenfel’s Sewerage Scheme Upgrade – Review of Environmental Factors (REF) By South Littleton’s SPS to Sewage Pump Station No 1 (SPS No 1) For
The Project Manager The Determining Authority
t:\a operations\bob salmon\letter drop\ref annex a to south bowenfels sewerage schemsupgrade1 sans ownership details.docx
Page 37 of 38 pages 21-Aug-13
Refer to drawing 1102133-61 to 64
0. Pipeline Chainage (From Pump Station)
1. Property Details (Lot No & DP)
2. Ownership Details (Address)
3. Detailed Description of Proposal (See table 3 above)
4. Description of the existing environment 5. The likely Impact of the Development on the Environment (See table 4 & 5 above)
6. What Steps will be taken to Protect the Environment (See table 6 above)
2303 to 2400
Lot 2, DP 229,883
54 3.1. The proposal is to: clear the line, excavate, lay, backfill, compact and reinstate after installation of a deeper 250 to 355-NB pipeline
4A Grass land with some services
5(a) Open excavation, stock piles, orange mesh/para- fencing
5(b) Fully reinstated and seeded
5(c) Regrowth re-established to 90-95%
2364 to 2400
Lot 1, DP 125,085, Lot 2 DP 947, 828
55 3.2. The proposal is to: under bore, jack or pull a 250 to 355-NB pipe though the under bore and connect to the adjoining shallow 300-NB pipeline positioned there by Separable Portion No 1
5(e) No discernible impact expected
3/5.7
Annex A to South Bowenfel’s Sewerage Scheme Upgrade – Review of Environmental Factors (REF) By South Littleton’s SPS to Sewage Pump Station No 1 (SPS No 1) For
The Project Manager The Determining Authority
t:\a operations\bob salmon\letter drop\ref annex a to south bowenfels sewerage schemsupgrade1 sans ownership details.docx
Page 38 of 38 pages 21-Aug-13
Refer to drawing 1102133-61 to 64
0. Pipeline Chainage (From Pump Station)
1. Property Details (Lot No & DP)
2. Ownership Details (Address)
3. Detailed Description of Proposal (See table 3 above)
4. Description of the existing environment 5. The likely Impact of the Development on the Environment (See table 4 & 5 above)
6. What Steps will be taken to Protect the Environment (See table 6 above)
2352 to 2346
56 3.2. The proposal is to: under bore, jack or pull a 250 to 355-NB pipe though the under bore and connect to the adjoining shallow 300-NB pipeline positioned there by Separable
5(e) No discernible impact expected
`