21
PWP Item No. 4331DS Outlying Islands Sewerage Stage 2 South Lantau Sewerage Works Environmental Impact Assessment Report 178711/B&V/0029/Draft H July 2014 25 B&V / ERM ANNEX 8B Construction Noise Impact Assessment

ANNEX 8B Construction Noise Impact Assessment · 15 Sewage Pumping Station - Tong Fuk YYYYYYYYYYYYYYYYY 16 Sewage Pumping Station - Shui Hau YYYYYYYYYYYYYY Y Y

  • Upload
    hathuy

  • View
    219

  • Download
    0

Embed Size (px)

Citation preview

Page 1: ANNEX 8B Construction Noise Impact Assessment · 15 Sewage Pumping Station - Tong Fuk YYYYYYYYYYYYYYYYY 16 Sewage Pumping Station - Shui Hau YYYYYYYYYYYYYY Y Y

PWP Item No. 4331DS

Outlying Islands Sewerage Stage 2 – South Lantau Sewerage Works

Environmental Impact Assessment Report

178711/B&V/0029/Draft H

July 2014 25 B&V / ERM

ANNEX 8B

Construction Noise Impact Assessment

ton79870
Text Box
ton79870
Text Box
Page 2: ANNEX 8B Construction Noise Impact Assessment · 15 Sewage Pumping Station - Tong Fuk YYYYYYYYYYYYYYYYY 16 Sewage Pumping Station - Shui Hau YYYYYYYYYYYYYY Y Y

Annex 8B-1 : Preliminary Construction Programme

7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3Daytime PeriodPackage A

1 Submarine Outfall Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y2 Sewage Treatment Works Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y3 Sewage Pumping Station - Pui O Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y4 Trunk Sewers/Rising Mains Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y5 Village Sewers - Pui O Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y

Package B6 Sewage Pumping Station - San Shek Wan Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y7 Sewage Pumping Station - Cheung Sha Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y8 Sewage Pumping Station - Cheung Fu Street Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y9 Trunk Sewers/Rising Mains Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y

10 Village Sewers - Ham Tin Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y11 Village Sewers - San Shek Wan Y Y Y Y Y Y Y Y Y12 Village Sewers - Cheung Sha Upper Village Y Y Y Y Y Y Y Y Y Y Y Y13 Village Sewers - Cheung Sha Lower Village Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y14 Village Sewers - Cheung Fu Steet Region Y Y Y Y Y Y Y Y

Package C15 Sewage Pumping Station - Tong Fuk Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y16 Sewage Pumping Station - Shui Hau Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y17 Trunk Sewers/Rising Mains Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y18 Village Sewers - Tong Fuk Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y19 Village Sewers - Shui Hau Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y

Note:Construction activities are described as:[I] Village sewer[II] Trunk sewer/rising main[III] SPS[IV] STW[V] Submarine outfallInterfacing between village sewerage [I] and trunk sewerage [II] could be avoided by proper programming. Interfacing for construction of the SPS [III], STW [IV]/submarine outfall [V] and the respective trunk sewers/rising mains [II] cannot be avoidedWhere applicable, cumulative impact is calculated for interfacing of construction activities [II] and [III], or [II], [IV] and [V].

2020 2021 2022 2023 2024No. Activity Description 2017 2018 2019

Annex 8B-1 Construction Programme_20160812.xlsx

Page 3: ANNEX 8B Construction Noise Impact Assessment · 15 Sewage Pumping Station - Tong Fuk YYYYYYYYYYYYYYYYY 16 Sewage Pumping Station - Shui Hau YYYYYYYYYYYYYY Y Y

Agreement No. CE 55/2009 (DS)

Outlying Islands Sewerage Stage 2 - South Lantau Sewerage Works - Investigation

Annex 8B-2a : Construction Plant Inventory (Without Mitigation)

No. Activities Plant TM Ref. / Other

Ref. [1]

No. of

PME

On-

time %

Unit

SWL,

dB(A)

SWL,

dB(A)

Total SWL,

dB(A)[2]

Daytime Period

I) Village Sewers

a) Sawcutting pavement Concrete saw CNP 203 1 70% 115 113 113

b) Breaking up of pavement Hand-held breaker CNP 024 1 70% 108 106 107

Generator, super silenced,

70dB(A) at 7m

CNP 103 1 70% 95 93

c) Excavation Mini excavator EPD/PME/13 1 70% 94 92 92

(only if works area is accessible)

d) Pipe laying Lorry, with crane/grab, 5.5

tonne < gross vehicle weight ≦

38 tonne

EPD/PME/36 1 70% 105 103 103

(only if works area is accessible)

e) Backfilling Lorry, with crane/grab, 5.5

tonne < gross vehicle weight ≦

38 tonne

EPD/PME/36 1 70% 105 103 106

(only if works area is accessible)

Vibrator compactor CNP 050 1 70% 105 103

f) Reinstatement (concrete) Concrete lorry mixer CNP 044 1 70% 109 107 108

(only if works area is accessible)

Elecrtric vibratory poker CNP 173 1 70% 94 92

Generator, super silenced,

70dB(A) at 7m

CNP 103 1 70% 95 93

Notes:

[1]

[2] The figures are rounded-up to a whole number.

BS - British Standard BS 5228:2009, Part 1 Noise and Vibration Control on Construction and Open Sites

Other Ref. - SWLs refer to other PME documented by the Noise Control Authority (EPD/PME/no.)

(http://www.epd.gov.hk/epd/english/application_for_licences/guidance/files/OtherSWLe.pdf )

0115164_Construction noise_v7_unmit.xlsx Page 1 of 6

Jamius.Yeung
Text Box
PWP Item No. 4331DS Outlying Islands Sewerage Stage 2 – South Lantau Sewerage Works
Page 4: ANNEX 8B Construction Noise Impact Assessment · 15 Sewage Pumping Station - Tong Fuk YYYYYYYYYYYYYYYYY 16 Sewage Pumping Station - Shui Hau YYYYYYYYYYYYYY Y Y

Agreement No. CE 55/2009 (DS)

Outlying Islands Sewerage Stage 2 - South Lantau Sewerage Works - Investigation

Annex 8B-2b : Construction Plant Inventory (Without Mitigation)

No. Activities Plant TM Ref. /

Other Ref. [1]

No. of

PME

On-

time %

Remarks Unit

SWL,

dB(A)

SWL,

dB(A)

Total SWL,

dB(A)[2]

Daytime Period

I) Village Sewers (Works area is NOT accessible by large PME)

a) Sawcutting pavement Concrete saw CNP 203 1 70% 115 113 113

b) Breaking up of pavement Hand-held breaker CNP 024 1 70% 108 106 107

Generator, super silenced,

70dB(A) at 7m

CNP 103 1 70% 95 93

c) Excavation Mini excavator EPD/PME/13 1 70% Manual 0 0 0

(only if works area is accessible)

d) Pipe laying Lorry, with crane/grab, 5.5

tonne < gross vehicle weight ≦

38 tonne

EPD/PME/36 1 70% Manual 0 0 0

(only if works area is accessible)

e) Backfilling Lorry, with crane/grab, 5.5

tonne < gross vehicle weight ≦

38 tonne

EPD/PME/36 1 70% Manual 0 0 103

(only if works area is accessible)

Vibrator compactor CNP 050 1 70% 105 103

f) Reinstatement (concrete) Concrete lorry mixer CNP 044 1 70% Manual 0 0 96

(only if works area is accessible)

Elecrtric vibratory poker CNP 173 1 70% 94 92

Generator, super silenced,

70dB(A) at 7m

CNP 103 1 70% 95 93

Notes:

[1]

[2] The figures are rounded-up to a whole number.

BS - British Standard BS 5228:2009, Part 1 Noise and Vibration Control on Construction and Open Sites

Other Ref. - SWLs refer to other PME documented by the Noise Control Authority (EPD/PME/no.)

(http://www.epd.gov.hk/epd/english/application_for_licences/guidance/files/OtherSWLe.pdf )

0115164_Construction noise_v7_unmit.xlsx Page 2 of 6

Jamius.Yeung
Text Box
PWP Item No. 4331DS Outlying Islands Sewerage Stage 2 – South Lantau Sewerage Works
Page 5: ANNEX 8B Construction Noise Impact Assessment · 15 Sewage Pumping Station - Tong Fuk YYYYYYYYYYYYYYYYY 16 Sewage Pumping Station - Shui Hau YYYYYYYYYYYYYY Y Y

Agreement No. CE 55/2009 (DS)

Outlying Islands Sewerage Stage 2 - South Lantau Sewerage Works - Investigation

Annex 8B-2c : Construction Plant Inventory (Without Mitigation)

No. Activities Plant TM Ref. / Other

Ref. [1]

No. of

PME

On-

time %

Unit

SWL,

dB(A)

SWL,

dB(A)

Total SWL,

dB(A)[2]

Daytime Period

II) Trunk Sewers/ Rising Mains

a) Sawcutting pavement Concrete saw CNP 203 1 70% 115 113 113

b) Breaking up of pavement Hydraulic breaker CNP 028 1 70% 122 120 120

c) Excavation / Shoring Excavator CNP 081 1 70% 112 110 112

Dump truck EPD/PME/38 1 70% 105 103

Sheet piling machine BS D4 13 1 70% 106 104

d) Pipe laying Lorry, with crane/grab, 5.5

tonne < gross vehicle weight ≦

38 tonne

EPD/PME/36 1 70% 105 103 103

e) Backfilling Lorry, with crane/grab, 5.5

tonne < gross vehicle weight ≦

38 tonne

EPD/PME/36 1 70% 105 103 107

Vibratory compactor CNP 050 1 70% 105 103

Hydraulic extractor CNP 163 1 70% 90 88

f) Reinstatement (concrete) Concrete lorry mixer CNP 044 1 70% 109 107 108

Elecrtric vibratory poker CNP 173 1 70% 94 92

Generator, super silenced,

70dB(A) at 7m

CNP 103 1 70% 95 93

g) Reinstatement (asphalt) Asphalt paver CNP 044 1 70% 109 107 111

Dump truck EPD/PME/38 1 50% 105 102

Road roller CNP 185 1 100% 108 108

h) Painting of road marking Pain line marker CNP 161 1 100% 90 90 90

Notes:

[1]

[2] The figures are rounded-up to a whole number.

BS - British Standard BS 5228:2009, Part 1 Noise and Vibration Control on Construction and Open Sites

Other Ref. - SWLs refer to other PME documented by the Noise Control Authority (EPD/PME/no.)

(http://www.epd.gov.hk/epd/english/application_for_licences/guidance/files/OtherSWLe.pdf )

Page 3 of 6

Jamius.Yeung
Text Box
PWP Item No. 4331DS Outlying Islands Sewerage Stage 2 – South Lantau Sewerage Works
Page 6: ANNEX 8B Construction Noise Impact Assessment · 15 Sewage Pumping Station - Tong Fuk YYYYYYYYYYYYYYYYY 16 Sewage Pumping Station - Shui Hau YYYYYYYYYYYYYY Y Y

Agreement No. CE 55/2009 (DS)

Outlying Islands Sewerage Stage 2 - South Lantau Sewerage Works - Investigation

Annex 8B-2d : Construction Plant Inventory (Without Mitigation)

No. Activities Plant TM Ref. /

Other Ref. [1]

No. of

PME

On-

time %

Unit

SWL,

dB(A)

SWL,

dB(A)

Total SWL,

dB(A)[2]

Daytime Period

III) Construction of Sewage Pumping Station

Max SWL for Construction of Sewage Pumping Station, dB(A) = 114

a) Ground investigation Drill rig, rotary type (diesel) EPD/PME/12 1 70% 110 108 110

Grout Pump EPD/PME/15 1 70% 105 103

b) Site Clearance Excavator CNP 030 1 70% 115 113 114

Dump truck EPD/PME/38 1 70% 105 103

c) Site formation Excavation / Shoring Excavator CNP 081 1 70% 112 110 113

Dump truck EPD/PME/38 1 50% 105 102

Power rammer CNP 169 1 50% 108 105

Sheet piling machine BS D4 13 1 70% 106 104

d) Construction of sub-structure Mobile crane CNP 048 1 70% 112 110 112

Concrete lorry mixer CNP 044 1 70% 109 107

Electric vibratory poker CNP 173 1 70% 94 92

Generator, super silenced,

70dB(A) at 7m

CNP 103 1 70% 95 93

Water pump CNP 281 1 100% 88 88

e) Backfilling Lorry, with crane/grab, 5.5

tonne < gross vehicle weight ≦

38 tonne

EPD/PME/36 1 70% 105 103 107

(to be used at roadside)

Power rammer CNP 169 1 50% 108 105

Hydraulic extractor CNP 163 1 70% 90 88

f) Construction of superstructure Mobile crane CNP 048 1 70% 112 110 112

Concrete lorry mixer CNP 044 1 70% 109 107

Electric vibratory poker CNP 173 1 70% 94 92

Generator, super silenced,

70dB(A) at 7m

CNP 103 1 70% 95 93

g) E&M installations Mobile crane CNP 048 1 70% 112 110 111

(to be used at roadside) Lorry, 5.5 tonne < gross vehicle

weight ≦38 tonne

EPD/PME/33 1 70% 105 103

h) Architectural and landscaping work Mobile crane CNP 048 1 70% 112 110 111

(to be used at roadside) Lorry, 5.5 tonne < gross vehicle

weight ≦38 tonne

EPD/PME/33 1 70% 105 103

Notes:

[1]

[2] The figures are rounded-up to a whole number.

BS - British Standard BS 5228:2009, Part 1 Noise and Vibration Control on Construction and Open Sites

Other Ref. - SWLs refer to other PME documented by the Noise Control Authority (EPD/PME/no.)

(http://www.epd.gov.hk/epd/english/application_for_licences/guidance/files/OtherSWLe.pdf )

Page 4 of 6

Jamius.Yeung
Text Box
PWP Item No. 4331DS Outlying Islands Sewerage Stage 2 – South Lantau Sewerage Works
Page 7: ANNEX 8B Construction Noise Impact Assessment · 15 Sewage Pumping Station - Tong Fuk YYYYYYYYYYYYYYYYY 16 Sewage Pumping Station - Shui Hau YYYYYYYYYYYYYY Y Y

Agreement No. CE 55/2009 (DS)

Outlying Islands Sewerage Stage 2 - South Lantau Sewerage Works - Investigation

Annex 8B-2e : Construction Plant Inventory (Without Mitigation)

No. Activities Plant TM Ref. /

Other Ref. [1]

No. of

PME

On-

time %

Unit

SWL,

dB(A)

SWL,

dB(A)

Total SWL,

dB(A)[2]

Daytime Period

IV) Construction of Sewage Treatment Works

Max SWL for Construction of Sewage Treatment Works, dB(A) = 120

a) Ground investigation Drill rig, rotary type (diesel) EPD/PME/12 1 100% 110 110 111

Grout Pump EPD/PME/15 1 70% 105 103

b) Breaking up of pavement Hydraulic breaker CNP 028 1 70% 122 120 120

c) Site Clearance Bulldozer CNP 030 1 100% 115 115 115

Dump truck EPD/PME/38 1 100% 105 105

d) Site formation Excavation / Shoring Excavator CNP 081 1 100% 112 112 114

Dump truck EPD/PME/38 1 100% 105 105

Power rammer CNP 169 1 70% 108 106

Sheet piling machine BS D4 13 1 100% 106 106

e) Construction of sub-structure Mobile crane CNP 048 1 100% 112 112 114

Concrete lorry mixer CNP 044 1 100% 109 109

Electric vibratory poker CNP 173 1 70% 94 92

Generator, super silenced,

70dB(A) at 7m

CNP 103 1 70% 95 93

Water pump CNP 281 1 100% 88 88

f) Backfilling Lorry, with crane/grab, 5.5

tonne < gross vehicle weight ≦

38 tonne

EPD/PME/36 1 100% 105 105 110

Power rammer CNP 169 1 100% 108 108

Hydraulic extractor CNP 163 1 100% 90 90

g) Construction of superstructure Mobile crane CNP 048 1 100% 112 112 114

Concrete lorry mixer CNP 044 1 100% 109 109

Electric vibratory poker CNP 173 1 70% 94 92

Generator, super silenced,

70dB(A) at 7m

CNP 103 1 70% 95 93

h) E&M installations Mobile crane CNP 048 1 100% 112 112 113

Lorry, 5.5 tonne < gross vehicle

weight ≦38 tonne

EPD/PME/33 1 100% 105 105

i) Architectural and landscaping work Mobile crane CNP 048 1 100% 112 112 113

Lorry, 5.5 tonne < gross vehicle

weight ≦38 tonne

EPD/PME/33 1 100% 105 105

Notes:

[1]

[2] The figures are rounded-up to a whole number.

BS - British Standard BS 5228:2009, Part 1 Noise and Vibration Control on Construction and Open Sites

Other Ref. - SWLs refer to other PME documented by the Noise Control Authority (EPD/PME/no.)

(http://www.epd.gov.hk/epd/english/application_for_licences/guidance/files/OtherSWLe.pdf )

Page 5 of 6

Jamius.Yeung
Text Box
PWP Item No. 4331DS Outlying Islands Sewerage Stage 2 – South Lantau Sewerage Works
Page 8: ANNEX 8B Construction Noise Impact Assessment · 15 Sewage Pumping Station - Tong Fuk YYYYYYYYYYYYYYYYY 16 Sewage Pumping Station - Shui Hau YYYYYYYYYYYYYY Y Y

Agreement No. CE 55/2009 (DS)

Outlying Islands Sewerage Stage 2 - South Lantau Sewerage Works - Investigation

Annex 8B-2f : Construction Plant Inventory (Without Mitigation)

No. Activities Plant TM Ref. / Other

Ref. [1]

No. of

PME

On-

time %

Remarks Unit

SWL,

dB(A)

SWL,

dB(A)

Total SWL,

dB(A)[2]

Daytime Period

V) Submarine Outfall

Total SWL for Submarine Outfall (Land based works), dB(A) = 111

Total SWL for Submarine Outfall (Marine based works), dB(A) = 119

a) Ground investigation (Land based) Drill rig, rotary type (diesel) EPD/PME/12 1 100% 110 110 111

Grout Pump EPD/PME/15 1 70% 105 103

b) Ground investigation (Marine based) Derrick barge CNP 061 1 100% 118 118 119

Drill rig, rotary type (diesel) EPD/PME/12 1 100% 110 110

Grout Pump EPD/PME/15 1 70% 105 103

c) Horizontal Directional Drilling Diesel rock drill CNP 181 1 100% underground 0 0 0

(underground) Generator, silenced, 75dB(A) at

7m

CNP 102 1 100% underground 0 0

Electric winch CNP 262 1 100% underground 0 0

d) Marine dredging (Marine based) Derrick barge CNP 061 1 100% 118 118 119

Grab dredger CNP 063 1 100% 112 112

e) Diffuser installation (Marine based) Derrick barge CNP 061 1 100% 118 118 119

Concrete mixer CNP 046 1 100% 96 96

Concrete pump CNP 047 1 100% 109 109

Notes:

[1]

[2] The figures are rounded-up to a whole number.

BS - British Standard BS 5228:2009, Part 1 Noise and Vibration Control on Construction and Open Sites

Other Ref. - SWLs refer to other PME documented by the Noise Control Authority (EPD/PME/no.)

(http://www.epd.gov.hk/epd/english/application_for_licences/guidance/files/OtherSWLe.pdf )

Page 6 of 6

Jamius.Yeung
Text Box
PWP Item No. 4331DS Outlying Islands Sewerage Stage 2 – South Lantau Sewerage Works
Page 9: ANNEX 8B Construction Noise Impact Assessment · 15 Sewage Pumping Station - Tong Fuk YYYYYYYYYYYYYYYYY 16 Sewage Pumping Station - Shui Hau YYYYYYYYYYYYYY Y Y

Annex 8B-3a : Construction Noise Assessment - Predicted Noise Levels from Construction of Village Sewer (Without Mitigation)

Predicted CNL, dB(A)[4][5]

NSR Location EIAO-TM

Noise

Criteria

No. Activity Description Sawcutting

pavement

Breaking

up of

pavement

Excavation Pipe

laying

Backfilling Reinstatement

(concrete)

Maximum

No. of

Workfront

Distance Corr. for

distance

Corr. for

screening[6]

Corr. for faç

ade

Sawcutting

pavement

Breaking up

of

pavement

Excavation Pipe

laying

Backfilling Reinstatement

(concrete)

dB(A)[1] a) b) c) d) e) f) m[2] dB(A)[3][4] dB(A) dB(A) a) b) c) d) e) f)

N01a Shui Hau Village 75 13 Village Sewers - Shui Hau 113 107 92 103 106 108 3 2 -14 0 3 102 96 81 92 95 97

10 -28 -10 3 78 72 57 68 71 73

28 -37 0 3 80 73 59 70 73 74

Total CNL 102 96 81 92 95 97

N01b Shui Hau Village 75 13 Village Sewers - Shui Hau 113 107 92 103 106 108 3 8 -26 0 3 90 84 69 80 83 85

14 -31 -10 3 76 69 55 66 69 70

32 -38 0 3 78 72 57 68 71 73

Total CNL 91 84 70 81 84 85

N01c Shui Hau Village 75 13 Village Sewers - Shui Hau 113 107 92 103 106 108 3 30 -38 0 3 79 72 58 69 72 73

56 -43 0 3 74 67 53 64 67 68

84 -46 0 3 70 63 49 60 63 64

Total CNL 80 74 59 70 73 75

N02 Tong Fuk Centre 75 12 Village Sewers - Tong Fuk 113 107 92 103 106 108 n/a n/a -- 0 3 -- -- -- -- -- --

N03a Tong Fuk Village 75 12 Village Sewers - Tong Fuk 113 107 92 103 106 108 5 2 -14 0 3 102 96 81 92 95 97

28 -37 0 3 80 73 59 70 73 74

38 -40 0 3 77 70 56 67 70 71

68 -45 0 3 72 65 51 62 65 66

86 -47 0 3 70 63 49 60 63 64

Total CNL 102 96 81 92 95 97

N03b Tong Fuk Village 75 12 Village Sewers - Tong Fuk 113 107 92 103 106 108 5 5 -22 0 3 94 88 73 84 88 89

30 -38 0 3 79 72 58 69 72 73

36 -39 0 3 77 71 56 67 70 72

38 -40 0 3 77 70 56 67 70 71

80 -46 0 3 70 64 49 60 63 65

Total CNL 95 88 74 85 88 89

N05a 75 11 113 107 92 103 106 108 2 14 -31 0 3 86 79 65 76 79 80

34 -39 0 3 78 71 57 68 71 72

Total CNL 86 79 65 76 79 81

N05b 75 11 113 107 92 103 106 108 2 12 -30 0 3 87 80 66 77 80 81

28 -37 -10 3 70 63 49 60 63 64

87 80 66 77 80 81

N06 WSD Quarter 75 10 113 107 92 103 106 108 2 32 -38 0 3 78 72 57 68 71 73

62 -44 0 3 73 66 52 63 66 67

Total CNL 79 73 58 69 72 74

N07 75 10 113 107 92 103 106 108 3 32 -38 0 3 78 72 57 68 71 73

14 -31 0 3 86 79 65 76 79 80

25 -36 0 3 81 74 60 71 74 75

Total CNL 87 81 66 77 80 82

N08 Cheung Sha Ha Tsuen 75 10 113 107 92 103 106 108 3 8 -26 0 3 90 84 69 80 83 85

20 -34 -10 3 72 66 51 62 65 67

28 -37 0 3 80 73 59 70 73 74

Total CNL 91 84 70 81 84 85

N09 Cheung Sha Sheung Tsuen 75 9 113 107 92 103 106 108 3 14 -31 -10 3 76 69 55 66 69 70

16 -32 0 3 84 78 63 74 77 79

42 -40 0 3 76 69 55 66 69 70

Total CNL 85 79 64 75 78 80

N10 Cheung Sha Sheung Tsuen 75 9 113 107 92 103 106 108 3 10 -28 0 3 88 82 67 78 81 83

28 -37 0 3 80 73 59 70 73 74

56 -43 0 3 74 67 53 64 67 68

Total CNL 89 82 68 79 82 83

N11a YMCA Youth Camp 75 5 113 107 92 103 106 108 2 114 -49 0 3 67 61 46 57 60 62

130 -50 0 3 66 59 45 56 59 60

Total CNL 70 63 49 60 63 64

N11b San Shek Wan 75 5 113 107 92 103 106 108 2 5 -22 0 3 94 88 73 84 88 89

24 -36 0 3 81 74 60 71 74 75

Total CNL 95 88 74 85 88 89

SWL, dB(A)[4]

Government Holiday

Bungalows

Residences at Cheung Fu

Street

Residences at Cheung Fu

Street

Village Sewers - Cheng Fu

Street Region

Village Sewers - Cheng Fu

Street Region

Village Sewers - Cheung Sha

Lower Village

Village Sewers - Cheung Sha

Lower Village

Village Sewers - Cheung Sha

Lower Village

Village Sewers - Cheung Sha

Upper Village

Village Sewers - Cheung Sha

Upper Village

Village Sewers - San Shek

Wan

Village Sewers - San Shek

Wan

Page 1 of 2

Page 10: ANNEX 8B Construction Noise Impact Assessment · 15 Sewage Pumping Station - Tong Fuk YYYYYYYYYYYYYYYYY 16 Sewage Pumping Station - Shui Hau YYYYYYYYYYYYYY Y Y

Predicted CNL, dB(A)[4][5]

NSR Location EIAO-TM

Noise

Criteria

No. Activity Description Sawcutting

pavement

Breaking

up of

pavement

Excavation Pipe

laying

Backfilling Reinstatement

(concrete)

Maximum

No. of

Workfront

Distance Corr. for

distance

Corr. for

screening[6]

Corr. for faç

ade

Sawcutting

pavement

Breaking up

of

pavement

Excavation Pipe

laying

Backfilling Reinstatement

(concrete)

dB(A)[1] a) b) c) d) e) f) m[2] dB(A)[3][4] dB(A) dB(A) a) b) c) d) e) f)

SWL, dB(A)[4]

N11c San Shek Wan 75 5 113 107 92 103 106 108 2 10 -28 0 3 88 82 67 78 81 83

23 -35 0 3 81 74 60 71 74 76

89 82 68 79 82 84

N12a Lo Uk Tsuen 75 3 Village Sewers - Pui O 113 107 92 103 106 108 4 20 -34 0 3 82 76 61 72 75 77

28 -37 0 3 80 73 59 70 73 74

36 -39 -10 3 67 61 46 57 60 62

44 -41 0 3 76 69 55 66 69 70

Total CNL 85 78 64 75 78 79

N12b Lo Uk Tsuen 75 3 Village Sewers - Pui O 113 107 92 103 106 108 4 10 -28 0 3 88 82 67 78 81 83

12 -30 0 3 87 80 66 77 80 81

18 -33 0 3 83 77 62 73 76 78

24 -36 -10 3 71 64 50 61 64 65

Total CNL 92 85 71 82 85 86

N12c Lo Uk Tsuen 75 3 Village Sewers - Pui O 113 107 92 103 106 108 4 12 -30 0 3 87 80 66 77 80 81

20 -34 -10 3 72 66 51 62 65 67

30 -38 -10 3 69 62 48 59 62 63

44 -41 -10 3 66 59 45 56 59 60

Total CNL 87 80 66 77 80 81

N13 Pui O San Wai Tsuen 75 3 Village Sewers - Pui O 113 107 92 103 106 108 3 12 -30 0 3 87 80 66 77 80 81

22 -35 0 3 82 75 61 72 75 76

38 -40 0 3 77 70 56 67 70 71

Total CNL 88 82 67 78 81 83

N14 75 4 Village Sewers - Ham Tin 113 107 92 103 106 108 3 12 -30 0 3 87 80 66 77 80 81

40 -40 0 3 76 70 55 66 69 71

64 -44 0 3 72 66 51 62 65 67

Total CNL 87 81 66 77 80 82

N15a Pui O Lo Wai Tsuen 75 3 Village Sewers - Pui O 113 107 92 103 106 108 3 5 -22 0 3 94 88 73 84 88 89

55 -43 0 3 74 67 53 64 67 68

65 -44 0 3 72 65 51 62 65 67

Total CNL 95 88 74 85 88 89

N15b Pui O Lo Wai Tsuen 75 3 Village Sewers - Pui O 113 107 92 103 106 108 3 5 -22 0 3 94 88 73 84 88 89

25 -36 0 3 81 74 60 71 74 75

32 -38 0 3 78 72 57 68 71 73

Total CNL 95 88 74 85 88 89

N16a Ham Tin San Tsuen 75 4 Village Sewers - Ham Tin 113 107 92 103 106 108 4 56 -43 0 3 74 67 53 64 67 68

65 -44 0 3 72 65 51 62 65 67

76 -46 0 3 71 64 50 61 64 65

94 -47 0 3 69 62 48 59 62 63

Total CNL 78 71 57 68 71 72

N16b Ham Tin San Tsuen 75 4 Village Sewers - Ham Tin 113 107 92 103 106 108 4 12 -30 0 3 87 80 66 77 80 81

28 -37 -10 3 70 63 49 60 63 64

58 -43 -10 3 63 56 42 53 56 58

15 -32 -10 3 75 68 54 65 68 69

Total CNL 87 80 66 77 80 82

N17 Bui O Public School 70/65 3 Village Sewers - Pui O 113 107 92 103 106 108 3 48 -42 0 3 75 68 54 65 68 69

70 -45 0 3 72 65 51 62 65 66

70 -45 0 3 72 65 51 62 65 66

Total CNL 78 71 57 68 71 72

Notes:

[1] 70/65 Noise criteria during normal school days / examination period

[2] Distance more than 300m from the works area were not assessed

[3] Distance Correction for PMEs = 10*log(2*PI*r2)

[4] The figures are rounded-up to a whole number.

[5] 76 Predicted Noise Level exceeded the corresponding EIAO-TM noise criteria.

[6] A negative correction of -10dB(A) is applied to the NSR when the whole construction workfront will not be visible when viewed from the assessment point.

Village Sewers - San Shek

Wan

South Lantau Community

Centre

Page 2 of 2

Page 11: ANNEX 8B Construction Noise Impact Assessment · 15 Sewage Pumping Station - Tong Fuk YYYYYYYYYYYYYYYYY 16 Sewage Pumping Station - Shui Hau YYYYYYYYYYYYYY Y Y

Annex 8B-3b : Construction Noise Assessment - Predicted Noise Levels from Construction of Village Sewer (Without Mitigation)

Predicted CNL, dB(A)[4][5]

NSR Location EIAO-TM

Noise

Criteria

No. Activity Description Sawcutting

pavement

Breaking

up of

pavement

Excavation Pipe

laying

Backfilling Reinstatement

(concrete)

Maximum

No. of

Workfront

Distance Corr. for

distance

Corr. for

screening[6]

Corr. for fa

çade

Sawcutting

pavement

Breaking up

of

pavement

Excavation Pipe

laying

Backfilling Reinstatement

(concrete)

dB(A)[1] a) b) c) d) e) f) m[2] dB(A)[3][4] dB(A) dB(A) a) b) c) d) e) f)

N01a Shui Hau Village 75 13 Village Sewers - Shui Hau 113 107 0 0 103 96 3 2 -14 0 3 102 96 -- -- 92 85

10 -28 -10 3 78 72 -- -- 68 61

28 -37 0 3 80 73 -- -- 70 62

Total CNL 102 96 -- -- 92 85

N01b Shui Hau Village 75 13 Village Sewers - Shui Hau 113 107 0 0 103 96 3 8 -26 0 3 90 84 -- -- 80 73

14 -31 -10 3 76 69 -- -- 66 58

32 -38 0 3 78 72 -- -- 68 61

Total CNL 91 84 -- -- 81 73

N01c Shui Hau Village 75 13 Village Sewers - Shui Hau 113 107 0 0 103 96 3 30 -38 0 3 79 72 -- -- 69 61

56 -43 0 3 74 67 -- -- 64 56

84 -46 0 3 70 63 -- -- 60 53

Total CNL 80 74 -- -- 70 63

N02 Tong Fuk Centre 75 12 Village Sewers - Tong Fuk 113 107 0 0 103 96 n/a n/a -- 3 -- -- -- -- -- --

N03a Tong Fuk Village 75 12 Village Sewers - Tong Fuk 113 107 0 0 103 96 5 2 -14 0 3 102 96 -- -- 92 85

28 -37 0 3 80 73 -- -- 70 62

38 -40 0 3 77 70 -- -- 67 59

68 -45 0 3 72 65 -- -- 62 54

86 -47 0 3 70 63 -- -- 60 52

Total CNL 102 96 -- -- 92 85

N03b Tong Fuk Village 75 12 Village Sewers - Tong Fuk 113 107 0 0 103 96 5 5 -22 0 3 94 88 -- -- 84 77

30 -38 0 3 79 72 -- -- 69 61

36 -39 0 3 77 71 -- -- 67 60

38 -40 0 3 77 70 -- -- 67 59

80 -46 0 3 70 64 -- -- 60 53

Total CNL 95 88 -- -- 85 77

N05a 75 11 113 107 0 0 103 96 2 14 -31 0 3 86 79 -- -- 76 68

34 -39 0 3 78 71 -- -- 68 60

Total CNL 86 79 -- -- 76 69

N05b 75 11 113 107 0 0 103 96 2 12 -30 0 3 87 80 -- -- 77 69

28 -37 -10 3 70 63 -- -- 60 52

87 80 -- -- 77 70

N06 WSD Quarter 75 10 113 107 0 0 103 96 2 32 -38 0 3 78 72 -- -- 68 61

62 -44 0 3 73 66 -- -- 63 55

Total CNL 79 73 -- -- 69 62

N07 75 10 113 107 0 0 103 96 3 32 -38 0 3 78 72 -- -- 68 61

14 -31 0 3 86 79 -- -- 76 68

25 -36 0 3 81 74 -- -- 71 63

Total CNL 87 81 -- -- 77 70

N08 Cheung Sha Ha Tsuen 75 10 113 107 0 0 103 96 3 8 -26 0 3 90 84 -- -- 80 73

20 -34 -10 3 72 66 -- -- 62 55

28 -37 0 3 80 73 -- -- 70 62

Total CNL 91 84 -- -- 81 73

N09 Cheung Sha Sheung Tsuen 75 9 113 107 0 0 103 96 3 14 -31 -10 3 76 69 -- -- 66 58

16 -32 0 3 84 78 -- -- 74 67

42 -40 0 3 76 69 -- -- 66 59

Total CNL 85 79 -- -- 75 68

N10 Cheung Sha Sheung Tsuen 75 9 113 107 0 0 103 96 3 10 -28 0 3 88 82 -- -- 78 71

28 -37 0 3 80 73 -- -- 70 62

56 -43 0 3 74 67 -- -- 64 56

Total CNL 89 82 -- -- 79 72

N11a YMCA Youth Camp 75 5 113 107 0 0 103 96 2 114 -49 0 3 67 61 -- -- 57 50

130 -50 0 3 66 59 -- -- 56 49

Total CNL 70 63 -- -- 60 52

N11b San Shek Wan 75 5 113 107 0 0 103 96 2 5 -22 0 3 94 88 -- -- 84 77

24 -36 0 3 81 74 -- -- 71 63

Total CNL 95 88 -- -- 85 77

Village Sewers - San Shek

Wan

Village Sewers - San Shek

Wan

Village Sewers - Cheung Sha

Lower Village

Government Holiday

Bungalows

Village Sewers - Cheung Sha

Lower Village

Village Sewers - Cheung Sha

Lower Village

Village Sewers - Cheung Sha

Upper Village

Village Sewers - Cheung Sha

Upper Village

SWL, dB(A)[4]

Residences at Cheung Fu

Street

Village Sewers - Cheng Fu

Street Region

Residences at Cheung Fu

Street

Village Sewers - Cheng Fu

Street Region

Page 1 of 2

Page 12: ANNEX 8B Construction Noise Impact Assessment · 15 Sewage Pumping Station - Tong Fuk YYYYYYYYYYYYYYYYY 16 Sewage Pumping Station - Shui Hau YYYYYYYYYYYYYY Y Y

Predicted CNL, dB(A)[4][5]

NSR Location EIAO-TM

Noise

Criteria

No. Activity Description Sawcutting

pavement

Breaking

up of

pavement

Excavation Pipe

laying

Backfilling Reinstatement

(concrete)

Maximum

No. of

Workfront

Distance Corr. for

distance

Corr. for

screening[6]

Corr. for fa

çade

Sawcutting

pavement

Breaking up

of

pavement

Excavation Pipe

laying

Backfilling Reinstatement

(concrete)

dB(A)[1] a) b) c) d) e) f) m[2] dB(A)[3][4] dB(A) dB(A) a) b) c) d) e) f)

SWL, dB(A)[4]

N11c San Shek Wan 75 5 113 107 0 0 103 96 2 10 -28 0 3 88 82 -- -- 78 71

23 -35 0 3 81 74 -- -- 71 64

89 82 -- -- 79 72

N12a Lo Uk Tsuen 75 3 Village Sewers - Pui O 113 107 0 0 103 96 4 20 -34 0 3 82 76 -- -- 72 65

28 -37 0 3 80 73 -- -- 70 62

36 -39 -10 3 67 61 -- -- 57 50

44 -41 0 3 76 69 -- -- 66 58

Total CNL 85 78 -- -- 75 67

N12b Lo Uk Tsuen 75 3 Village Sewers - Pui O 113 107 0 0 103 96 4 10 -28 0 3 88 82 -- -- 78 71

12 -30 0 3 87 80 -- -- 77 69

18 -33 0 3 83 77 -- -- 73 66

24 -36 -10 3 71 64 -- -- 61 53

Total CNL 92 85 -- -- 82 74

N12c Lo Uk Tsuen 75 3 Village Sewers - Pui O 113 107 0 0 103 96 4 12 -30 0 3 87 80 -- -- 77 69

20 -34 -10 3 72 66 -- -- 62 55

30 -38 -10 3 69 62 -- -- 59 51

44 -41 -10 3 66 59 -- -- 56 48

Total CNL 87 80 -- -- 77 70

N13 Pui O San Wai Tsuen 75 3 Village Sewers - Pui O 113 107 0 0 103 96 3 12 -30 0 3 87 80 -- -- 77 69

22 -35 0 3 82 75 -- -- 72 64

38 -40 0 3 77 70 -- -- 67 59

Total CNL 88 82 -- -- 78 71

N14 75 4 Village Sewers - Ham Tin 113 107 0 0 103 96 3 12 -30 0 3 87 80 -- -- 77 69

40 -40 0 3 76 70 -- -- 66 59

64 -44 0 3 72 66 -- -- 62 55

Total CNL 87 81 -- -- 77 70

N15a Pui O Lo Wai Tsuen 75 3 Village Sewers - Pui O 113 107 0 0 103 96 3 5 -22 0 3 94 88 -- -- 84 77

55 -43 0 3 74 67 -- -- 64 56

65 -44 0 3 72 65 -- -- 62 55

Total CNL 95 88 -- -- 85 77

N15b Pui O Lo Wai Tsuen 75 3 Village Sewers - Pui O 113 107 0 0 103 96 3 5 -22 0 3 94 88 -- -- 84 77

25 -36 0 3 81 74 -- -- 71 63

32 -38 0 3 78 72 -- -- 68 61

Total CNL 95 88 -- -- 85 77

N16a Ham Tin San Tsuen 75 4 Village Sewers - Ham Tin 113 107 0 0 103 96 4 56 -43 0 3 74 67 -- -- 64 56

65 -44 0 3 72 65 -- -- 62 55

76 -46 0 3 71 64 -- -- 61 53

94 -47 0 3 69 62 -- -- 59 52

Total CNL 78 71 -- -- 68 60

N16b Ham Tin San Tsuen 75 4 Village Sewers - Ham Tin 113 107 0 0 103 96 4 12 -30 0 3 87 80 -- -- 77 69

28 -37 -10 3 70 63 -- -- 60 52

58 -43 -10 3 63 56 -- -- 53 46

15 -32 -10 3 75 68 -- -- 65 57

Total CNL 87 80 -- -- 77 70

N17 Bui O Public School 70/65 3 Village Sewers - Pui O 113 107 0 0 103 96 3 48 -42 0 3 75 68 -- -- 65 57

70 -45 0 3 72 65 -- -- 62 54

70 -45 0 3 72 65 -- -- 62 54

Total CNL 78 71 -- -- 68 60

Notes:

[1] 70/65 Noise criteria during normal school days / examination period

[2] Distance more than 300m from the works area were not assessed

[3] Distance Correction for PMEs = 10*log(2*PI*r2)

[4] The figures are rounded-up to a whole number.

[5] 76 Predicted Noise Level exceeded the corresponding EIAO-TM noise criteria.

[6] A negative correction of -10dB(A) is applied to the NSR when the whole construction workfront will not be visible when viewed from the assessment point.

Village Sewers - San Shek

Wan

South Lantau Community

Centre

Page 2 of 2

Page 13: ANNEX 8B Construction Noise Impact Assessment · 15 Sewage Pumping Station - Tong Fuk YYYYYYYYYYYYYYYYY 16 Sewage Pumping Station - Shui Hau YYYYYYYYYYYYYY Y Y

Annex 8B-3c : Construction Noise Assessment - Predicted Noise Levels from Construction of Trunk Sewers/Rising Mains (Without Mitigation)

SWL, dB(A)[4]

Activity Description Sawcutting

pavement

Breaking up

of

pavement

Excavation /

Shoring

Pipe

laying

Backfilling Reinstatement

(concrete)

Reinstatement

(asphalt)

Painting of

road

marking

a) b) c) d) e) f) g) h)

Trunk Sewers/Rising Mains 113 120 112 103 107 108 111 90

Predicted CNL, dB(A)[4][5]

NSR Location EIAO-TM

Noise

Criteria

Distance Corr. for

distance

Corr. for

screening

Corr. for

façade

Sawcutting

pavement

Breaking up

of

pavement

Excavation /

Shoring

Pipe

laying

Backfilling Reinstatement

(concrete)

Reinstatement

(asphalt)

Painting of

road

marking

dB(A)[1] m[2] dB(A)[3][4] dB(A) dB(A) a) b) c) d) e) f) g) h)

N01a Shui Hau Village 75 82 -46 - 3 70 77 69 60 63 64 68 47

42 -40 - 3 76 83 75 66 69 70 74 53

8 -26 - 3 90 97 89 80 83 85 88 67

36 -39 - 3 77 84 76 67 70 72 75 54

66 -44 - 3 72 79 71 62 65 66 70 49

106 -48 - 3 68 75 67 58 61 62 66 45

Total CNL 91 98 89 81 84 85 89 67

N01b Shui Hau Village 75 114 -49 - 3 67 74 66 57 60 62 65 44

74 -45 - 3 71 78 70 61 64 65 69 48

36 -39 - 3 77 84 76 67 70 72 75 54

14 -31 - 3 86 93 84 76 79 80 83 62

48 -42 - 3 75 82 73 65 68 69 73 51

75 -45 - 3 71 78 70 61 64 65 69 48

Total CNL 87 94 85 77 80 81 85 63

N01c Shui Hau Village 75 130 -50 - 3 66 73 65 56 59 60 64 43

110 -49 - 3 68 75 66 58 61 62 65 44

90 -47 - 3 69 76 68 59 62 64 67 46

70 -45 - 3 72 79 70 62 65 66 69 48

88 -47 - 3 70 77 68 60 63 64 67 46

114 -49 - 3 67 74 66 57 60 62 65 44

Total CNL 77 84 75 67 70 71 75 53

N02 Tong Fuk Centre 75 92 -47 - 3 69 76 68 59 62 63 67 46

64 -44 - 3 72 79 71 62 65 67 70 49

52 -42 - 3 74 81 73 64 67 68 72 51

64 -44 - 3 72 79 71 62 65 67 70 49

94 -47 - 3 69 76 68 59 62 63 67 46

128 -50 - 3 66 73 65 56 59 61 64 43

Total CNL 79 86 78 69 72 73 77 56

N03a Tong Fuk Village 75 78 -46 - 3 71 78 69 61 64 65 68 47

40 -40 - 3 76 83 75 66 70 71 74 53

42 -40 - 3 76 83 75 66 69 70 74 53

12 -30 - 3 87 94 86 77 80 81 85 63

40 -40 - 3 76 83 75 66 70 71 74 53

78 -46 - 3 71 78 69 61 64 65 68 47

Total CNL 88 95 87 78 81 82 86 65

N03b Tong Fuk Village 75 116 -49 - 3 67 74 66 57 60 61 65 44

85 -47 - 3 70 77 68 60 63 64 68 46

48 -42 - 3 75 82 73 65 68 69 73 51

16 -32 - 3 84 91 83 74 77 79 82 61

28 -37 - 3 80 87 78 70 73 74 77 56

60 -44 - 3 73 80 72 63 66 67 71 49

Total CNL 86 93 85 76 79 81 84 63

N05a 75 100 -48 - 3 68 75 67 58 62 63 66 45

64 -44 - 3 72 79 71 62 65 67 70 49

30 -38 - 3 79 86 78 69 72 73 77 55

40 -40 - 3 76 83 75 66 70 71 74 53

78 -46 - 3 71 78 69 61 64 65 68 47

112 -49 - 3 67 74 66 57 61 62 65 44

Total CNL 82 89 81 72 75 76 80 59

N05b 75 104 -48 - 3 68 75 67 58 61 62 66 45

62 -44 - 3 73 80 71 63 66 67 70 49

35 -39 - 3 78 85 76 68 71 72 75 54

26 -36 - 3 80 87 79 70 73 74 78 57

60 -44 - 3 73 80 72 63 66 67 71 49

90 -47 - 3 69 76 68 59 62 64 67 46

Total CNL 83 90 82 73 76 78 81 60

N06 WSD Quarter 75 106 -48 - 3 68 75 67 58 61 62 66 45

90 -47 - 3 69 76 68 59 62 64 67 46

84 -46 - 3 70 77 69 60 63 64 68 47

90 -47 - 3 69 76 68 59 62 64 67 46

108 -49 - 3 68 75 66 58 61 62 66 44

122 -50 - 3 67 74 65 57 60 61 65 43

Total CNL 76 83 75 66 70 71 74 53

N07 75 68 -45 - 3 72 79 70 62 65 66 70 48

38 -40 - 3 77 84 75 67 70 71 75 53

40 -40 - 3 76 83 75 66 70 71 74 53

70 -45 - 3 72 79 70 62 65 66 69 48

90 -47 - 3 69 76 68 59 62 64 67 46

95 -48 - 3 69 76 68 59 62 63 67 45

Total CNL 81 88 80 71 74 76 79 58

N08 Cheung Sha Ha Tsuen 75 105 -48 - 3 68 75 67 58 61 62 66 45

75 -45 - 3 71 78 70 61 64 65 69 48

52 -42 - 3 74 81 73 64 67 68 72 51

65 -44 - 3 72 79 71 62 65 67 70 49

106 -48 - 3 68 75 67 58 61 62 66 45

142 -51 - 3 65 72 64 55 59 60 63 42

Total CNL 79 86 77 69 72 73 76 55

Residences at Cheung Fu

Street

Residences at Cheung Fu

Street

Government Holiday

Bungalows

Page 1 of 3

Page 14: ANNEX 8B Construction Noise Impact Assessment · 15 Sewage Pumping Station - Tong Fuk YYYYYYYYYYYYYYYYY 16 Sewage Pumping Station - Shui Hau YYYYYYYYYYYYYY Y Y

Predicted CNL, dB(A)[4][5]

NSR Location EIAO-TM

Noise

Criteria

Distance Corr. for

distance

Corr. for

screening

Corr. for

façade

Sawcutting

pavement

Breaking up

of

pavement

Excavation /

Shoring

Pipe

laying

Backfilling Reinstatement

(concrete)

Reinstatement

(asphalt)

Painting of

road

marking

dB(A)[1] m[2] dB(A)[3][4] dB(A) dB(A) a) b) c) d) e) f) g) h)

N09 Cheung Sha Sheung Tsuen 75 150 -52 - 3 65 72 64 55 58 59 63 41

110 -49 - 3 68 75 66 58 61 62 65 44

70 -45 - 3 72 79 70 62 65 66 69 48

50 -42 - 3 74 81 73 64 68 69 72 51

70 -45 - 3 72 79 70 62 65 66 69 48

106 -48 - 3 68 75 67 58 61 62 66 45

Total CNL 79 86 77 69 72 73 76 55

N10 Cheung Sha Sheung Tsuen 75 110 -49 - 3 68 75 66 58 61 62 65 44

78 -46 - 3 71 78 69 61 64 65 68 47

38 -40 - 3 77 84 75 67 70 71 75 53

10 -28 - 3 88 95 87 78 82 83 86 65

36 -39 - 3 77 84 76 67 70 72 75 54

70 -45 - 3 72 79 70 62 65 66 69 48

Total CNL 89 96 88 79 82 84 87 66

N11a YMCA Youth Camp 75 86 -47 - 3 70 77 68 60 63 64 68 46

48 -42 - 3 75 82 73 65 68 69 73 51

20 -34 - 3 82 89 81 72 76 77 80 59

45 -41 - 3 75 82 74 65 68 70 73 52

74 -45 - 3 71 78 70 61 64 65 69 48

122 -50 - 3 67 74 65 57 60 61 65 43

Total CNL 84 91 83 74 77 79 82 61

N11b San Shek Wan 75 122 -50 0 3 67 74 65 57 60 61 65 43

89 -47 0 3 69 76 68 59 63 64 67 46

55 -43 0 3 74 81 72 64 67 68 71 50

18 -33 0 3 83 90 82 73 76 78 81 60

20 -34 0 3 82 89 81 72 76 77 80 59

52 -42 -10 3 64 71 63 54 57 58 62 41

Total CNL 86 93 85 76 79 81 84 63

N11c San Shek Wan 75 62 -44 0 3 73 80 71 63 66 67 70 49

26 -36 0 3 80 87 79 70 73 74 78 57

30 -38 0 3 79 86 78 69 72 73 77 55

64 -44 0 3 72 79 71 62 65 67 70 49

90 -47 -10 3 59 66 58 49 52 54 57 36

118 -49 -10 3 57 64 56 47 50 51 55 34

Total CNL 83 90 82 73 76 78 81 60

N12a Lo Uk Tsuen 75 130 -50 - 3 66 73 65 56 59 60 64 43

95 -48 - 3 69 76 68 59 62 63 67 45

60 -44 - 3 73 80 72 63 66 67 71 49

44 -41 - 3 76 83 74 66 69 70 73 52

62 -44 - 3 73 80 71 63 66 67 70 49

106 -48 - 3 68 75 67 58 61 62 66 45

Total CNL 80 87 78 70 73 74 77 56

N12b Lo Uk Tsuen 75 113 -49 - 3 67 74 66 57 60 62 65 44

74 -45 - 3 71 78 70 61 64 65 69 48

34 -39 - 3 78 85 76 68 71 72 76 54

10 -28 - 3 88 95 87 78 82 83 86 65

34 -39 - 3 78 85 76 68 71 72 76 54

74 -45 - 3 71 78 70 61 64 65 69 48

Total CNL 89 96 88 79 82 84 87 66

N12c Lo Uk Tsuen 75 64 -44 - 3 72 79 71 62 65 67 70 49

26 -36 - 3 80 87 79 70 73 74 78 57

8 -26 - 3 90 97 89 80 83 85 88 67

36 -39 - 3 77 84 76 67 70 72 75 54

74 -45 - 3 71 78 70 61 64 65 69 48

116 -49 - 3 67 74 66 57 60 61 65 44

Total CNL 91 98 90 81 84 85 89 68

N13 Pui O San Wai Tsuen 75 94 -47 - 3 69 76 68 59 62 63 67 46

58 -43 - 3 73 80 72 63 66 68 71 50

16 -32 - 3 84 91 83 74 77 79 82 61

11 -29 - 3 88 95 86 78 81 82 85 64

48 -42 - 3 75 82 73 65 68 69 73 51

84 -46 - 3 70 77 69 60 63 64 68 47

Total CNL 90 97 88 80 83 84 87 66

N14 75 108 -49 - 3 68 75 66 58 61 62 66 44

68 -45 - 3 72 79 70 62 65 66 70 48

29 -37 - 3 79 86 78 69 72 74 77 56

6 -24 - 3 93 100 92 83 86 87 91 69

34 -39 - 3 78 85 76 68 71 72 76 54

74 -45 - 3 71 78 70 61 64 65 69 48

Total CNL 93 100 92 83 86 88 91 70

N15a Pui O Lo Wai Tsuen 75 115 -49 - 3 67 74 66 57 60 62 65 44

78 -46 - 3 71 78 69 61 64 65 68 47

50 -42 - 3 74 81 73 64 68 69 72 51

15 -32 - 3 85 92 84 75 78 79 83 61

30 -38 - 3 79 86 78 69 72 73 77 55

68 -45 - 3 72 79 70 62 65 66 70 48

Total CNL 87 94 85 77 80 81 84 63

N15b Pui O Lo Wai Tsuen 75 110 -49 - 3 68 75 66 58 61 62 65 44

72 -45 - 3 71 78 70 61 64 66 69 48

35 -39 - 3 78 85 76 68 71 72 75 54

20 -34 - 3 82 89 81 72 76 77 80 59

50 -42 - 3 74 81 73 64 68 69 72 51

84 -46 - 3 70 77 69 60 63 64 68 47

Total CNL 85 92 83 75 78 79 82 61

N16a Ham Tin San Tsuen 75 84 -46 - 3 70 77 69 60 63 64 68 47

46 -41 - 3 75 82 74 65 68 70 73 52

19 -34 - 3 83 90 82 73 76 77 81 59

45 -41 - 3 75 82 74 65 68 70 73 52

South Lantau Community

Centre

Page 2 of 3

Page 15: ANNEX 8B Construction Noise Impact Assessment · 15 Sewage Pumping Station - Tong Fuk YYYYYYYYYYYYYYYYY 16 Sewage Pumping Station - Shui Hau YYYYYYYYYYYYYY Y Y

Predicted CNL, dB(A)[4][5]

NSR Location EIAO-TM

Noise

Criteria

Distance Corr. for

distance

Corr. for

screening

Corr. for

façade

Sawcutting

pavement

Breaking up

of

pavement

Excavation /

Shoring

Pipe

laying

Backfilling Reinstatement

(concrete)

Reinstatement

(asphalt)

Painting of

road

marking

dB(A)[1] m[2] dB(A)[3][4] dB(A) dB(A) a) b) c) d) e) f) g) h)

80 -46 - 3 70 77 69 60 63 65 68 47

114 -49 - 3 67 74 66 57 60 62 65 44

Total CNL 85 92 83 75 78 79 82 61

N16b Ham Tin San Tsuen 75 25 -36 - 3 81 88 79 71 74 75 78 57

60 -44 - 3 73 80 72 63 66 67 71 49

96 -48 - 3 69 76 67 59 62 63 67 45

74 -45 - 3 71 78 70 61 64 65 69 48

160 -52 - 3 64 71 63 54 57 59 62 41

196 -54 - 3 63 70 61 53 56 57 60 39

Total CNL 82 89 81 72 75 76 80 59

N17 Bui O Public School 70/65 8 -26 - 3 90 97 89 80 83 85 88 67

38 -40 - 3 77 84 75 67 70 71 75 53

77 -46 - 3 71 78 69 61 64 65 69 47

15 -32 - 3 85 92 84 75 78 79 83 61

50 -42 - 3 74 81 73 64 68 69 72 51

84 -46 - 3 70 77 69 60 63 64 68 47

Total CNL 92 99 90 82 85 86 90 68

Notes:

[1] 70/65 Noise criteria during normal school days / examination period

[2] Distance more than 300m from the works area were not assessed

[3] Distance Correction for PMEs = 10*log(2*PI*r2)

[4] The figures are rounded-up to a whole number.

[5] 76 Predicted Noise Level exceeded the corresponding EIAO-TM noise criteria.

Page 3 of 3

Page 16: ANNEX 8B Construction Noise Impact Assessment · 15 Sewage Pumping Station - Tong Fuk YYYYYYYYYYYYYYYYY 16 Sewage Pumping Station - Shui Hau YYYYYYYYYYYYYY Y Y

No. Activity Description SWL Distance Corr. for

distance

Corr. for

façade

NSR

LocatiodB(A)

[2]m

[2]dB(A)

[3][4] dB(A)

N01a Shui Hau Village 75 18 Sewage Pumping Station - Shui Hau 114 n/a -- 3 --

N01b Shui Hau Village 75 18 Sewage Pumping Station - Shui Hau 114 n/a -- 3 --

N01c Shui Hau Village 75 18 Sewage Pumping Station - Shui Hau 114 85 -47 3 70

N02 Tong Fuk Centre 75 17 Sewage Pumping Station - Tong Fuk 114 n/a -- 3 --

N03a Tong Fuk Village 75 17 Sewage Pumping Station - Tong Fuk 114 53 -42 3 74

N03b Tong Fuk Village 75 17 Sewage Pumping Station - Tong Fuk 114 106 -48 3 68

N05a Residences at Cheung Fu Street 75 16 Sewage Pumping Station - Cheung Fu Street 114 11 -29 3 88

N05b Residences at Cheung Fu Street 75 16 Sewage Pumping Station - Cheung Fu Street 114 184 -53 3 64

N06 WSD Quarter 75 15 Sewage Pumping Station - Cheung Sha 114 273 -57 3 60

N07 Government Holiday Bungalows 75 15 Sewage Pumping Station - Cheung Sha 114 122 -50 3 67

N08 Cheung Sha Ha Tsuen 75 15 Sewage Pumping Station - Cheung Sha 114 33 -38 3 79

N09 Cheung Sha Sheung Tsuen 75 15 Sewage Pumping Station - Cheung Sha 114 209 -54 3 62

N10 Cheung Sha Sheung Tsuen 75 15 Sewage Pumping Station - Cheung Sha 114 n/a -- 3 --

N11a YMCA Youth Camp 75 8 Sewage Pumping Station - San Shek Wan 114 220 -55 3 62

N11b San Shek Wan 75 8 Sewage Pumping Station - San Shek Wan 114 58 -43 3 74

N11c San Shek Wan 75 8 Sewage Pumping Station - San Shek Wan 114 n/a -- 3 --

N12a Lo Uk Tsuen 75 7 Sewage Pumping Station - Pui O 114 n/a -- 3 --

N12b Lo Uk Tsuen 75 7 Sewage Pumping Station - Pui O 114 n/a -- 3 --

N12c Lo Uk Tsuen 75 7 Sewage Pumping Station - Pui O 114 n/a -- 3 --

N13 Pui O San Wai Tsuen 75 7 Sewage Pumping Station - Pui O 114 n/a -- 3 --

N14 South Lantau Community Centre 75 7 Sewage Pumping Station - Pui O 114 240 -56 3 61

N15a Pui O Lo Wai Tsuen 75 7 Sewage Pumping Station - Pui O 114 n/a -- 3 --

N15b Pui O Lo Wai Tsuen 75 7 Sewage Pumping Station - Pui O 114 n/a -- 3 --

N16a Ham Tin San Tsuen 75 7 Sewage Pumping Station - Pui O 114 154 -52 3 65

N16b Ham Tin San Tsuen 75 7 Sewage Pumping Station - Pui O 114 204 -54 3 63

N17 Bui O Public School 70/65 7 Sewage Pumping Station - Pui O 114 n/a -- 3 --

Notes:

[1] 70/65 Noise criteria during normal school days / examination period

[2] Distance more than 300m from the works area were not assessed

[3] Distance Correction for PMEs = 10*log(2*PI*r2)

[4] The figures are rounded-up to a whole number.

[5] Maximum predicted CNL for NSR N05a, please refer to Annex 8B-3e for detailed calculation

[6] 76 Predicted Noise Level exceeded the corresponding EIAO-TM noise criteria.

Annex 8B-3d : Construction Noise Assessment - Predicted Noise Levels from Construction of Sewage Pumping Stations

(Without Mitigation)

Predicted CNL,

dB(A)[4][5][6]

EIAO-TM

Noise

Criteria,

dB(A) [1]

Page 17: ANNEX 8B Construction Noise Impact Assessment · 15 Sewage Pumping Station - Tong Fuk YYYYYYYYYYYYYYYYY 16 Sewage Pumping Station - Shui Hau YYYYYYYYYYYYYY Y Y

Annex 8B-3e : Construction Noise Assessment - Predicted Noise Levels from Construction of Sewage Pumping Stations for NSR N05a (Without Mitigation)

SWL, dB(A)[4]

Predicted CNL, dB(A)[4][5]

Cheung Fu Street SPS Cheung Fu Street SPS

NSR Location Ground

investigation

Site

Clearance

Site

formation

Excavation /

Shoring

Construction

of sub-

structure

Backfilling

(except

Lorry)

Backfilling

(Lorry only)

Construction of

superstructure

E&M

installations

Architectural

and

landscaping

work

Distance Corr. for distance Ground

investigation

Site

Clearance

Site

formation

Excavation /

Shoring

Construction

of sub-

structure

Backfilling Backfilling Construction of

superstructure

E&M

installations

Architectural

and

landscaping

work

dB(A)[1] a) b) c) d) e) e) f) g) h) m

[2]dB(A)

[3][4] dB(A) a) b) c) d) e) e) f) g) h)

SPS works

area

SPS works

area

SPS works

area

SPS works

area

SPS works

area

Roadside Roadside Roadside Roadside SPS

works

area

Roadside SPS

works

area

Roadside SPS works

area

SPS works

area

SPS works

area

SPS works

area

SPS works

area

Roadside Roadside Roadside Roadside

N05a Residences at Cheung Fu Street 75 110 114 113 112 105 103 112 111 111 11 20 -29 -34 3 84 88 87 87 79 72 81 80 80

Predicted CNL for individual Activty, dB(A) 84 88 87 87 81 80 80

Notes:

[1] 70/65 Noise criteria during normal school days / examination period

[2] Distance more than 300m from the works area were not assessed

[3] Distance Correction for PMEs = 10*log(2*PI*r2)

[4] The figures are rounded-up to a whole number.

[5] 76 Predicted Noise Level exceeded the corresponding EIAO-TM noise criteria.

Corr. for

façade

EIAO-TM

Noise

Criteria

80

Page 18: ANNEX 8B Construction Noise Impact Assessment · 15 Sewage Pumping Station - Tong Fuk YYYYYYYYYYYYYYYYY 16 Sewage Pumping Station - Shui Hau YYYYYYYYYYYYYY Y Y

No. Activity Description SWL Distance Corr. for

distance

Corr. for

façade

NSR

LocatiodB(A)

[4]m

[2]dB(A)

[3][4] dB(A)

N01a Shui Hau Village 75 -- n/a n/a n/a -- 3 --

N01b Shui Hau Village 75 -- n/a n/a n/a -- 3 --

N01c Shui Hau Village 75 -- n/a n/a n/a -- 3 --

N02 Tong Fuk Centre 75 -- n/a n/a n/a -- 3 --

N03a Tong Fuk Village 75 -- n/a n/a n/a -- 3 --

N03b Tong Fuk Village 75 -- n/a n/a n/a -- 3 --

N05a Residences at Cheung Fu Street 75 -- n/a n/a n/a -- 3 --

N05b Residences at Cheung Fu Street 75 -- n/a n/a n/a -- 3 --

N06 WSD Quarter 75 -- n/a n/a n/a -- 3 --

N07 Government Holiday Bungalows 75 -- n/a n/a n/a -- 3 --

N08 Cheung Sha Ha Tsuen 75 -- n/a n/a n/a -- 3 --

N09 Cheung Sha Sheung Tsuen 75 -- n/a n/a n/a -- 3 --

N10 Cheung Sha Sheung Tsuen 75 -- n/a n/a n/a -- 3 --

N11a YMCA Youth Camp 75 -- n/a n/a n/a -- 3 --

N11b San Shek Wan 75 -- n/a n/a n/a -- 3 --

N11c San Shek Wan 75 -- n/a n/a n/a -- 3 --

N12a Lo Uk Tsuen 75 2 Sewage Treatment Works 120 87 -47 3 77

N12b Lo Uk Tsuen 75 2 Sewage Treatment Works 120 225 -55 3 68

N12c Lo Uk Tsuen 75 -- n/a 120 n/a -- 3 --

N13 Pui O San Wai Tsuen 75 -- n/a n/a n/a -- 3 --

N14 South Lantau Community Centre 75 -- n/a n/a n/a -- 3 --

N15a Pui O Lo Wai Tsuen 75 -- n/a n/a n/a -- 3 --

N15b Pui O Lo Wai Tsuen 75 -- n/a n/a n/a -- 3 --

N16a Ham Tin San Tsuen 75 -- n/a n/a n/a -- 3 --

N16b Ham Tin San Tsuen 75 -- n/a n/a n/a -- 3 --

N17 Bui O Public School 70/65 -- n/a n/a n/a -- 3 --

Notes:

[1] 70/65 Noise criteria during normal school days / examination period

[2] Distance more than 300m from the works area were not assessed

[3] Distance Correction for PMEs = 10*log(2*PI*r2)

[4] The figures are rounded-up to a whole number.

[5] 76 Predicted Noise Level exceeded the corresponding EIAO-TM noise criteria.

Annex 8B-3f : Construction Noise Assessment - Predicted Noise Levels from Construction of Sewage

Treatment Works (Without Mitigation)

Predicted CNL,

dB(A)[4][5]

EIAO-TM

Noise

Criteria,

dB(A) [1]

Page 19: ANNEX 8B Construction Noise Impact Assessment · 15 Sewage Pumping Station - Tong Fuk YYYYYYYYYYYYYYYYY 16 Sewage Pumping Station - Shui Hau YYYYYYYYYYYYYY Y Y

No. Activity Description SWL Distance Corr. for

distance

Corr. for

façade

NSR Location dB(A)[4]

m[2]

dB(A)[3][4] dB(A)

N01a Shui Hau Village 75 -- n/a n/a n/a -- 3 --

N01b Shui Hau Village 75 -- n/a n/a n/a -- 3 --

N01c Shui Hau Village 75 -- n/a n/a n/a -- 3 --

N02 Tong Fuk Centre 75 -- n/a n/a n/a -- 3 --

N03a Tong Fuk Village 75 -- n/a n/a n/a -- 3 --

N03b Tong Fuk Village 75 -- n/a n/a n/a -- 3 --

N05a Residences at Cheung Fu Street 75 -- n/a n/a n/a -- 3 --

N05b Residences at Cheung Fu Street 75 -- n/a n/a n/a -- 3 --

N06 WSD Quarter 75 -- n/a n/a n/a -- 3 --

N07 Government Holiday Bungalows 75 -- n/a n/a n/a -- 3 --

N08 Cheung Sha Ha Tsuen 75 -- n/a n/a n/a -- 3 --

N09 Cheung Sha Sheung Tsuen 75 -- n/a n/a n/a -- 3 --

N10 Cheung Sha Sheung Tsuen 75 -- n/a n/a n/a -- 3 --

N11a YMCA Youth Camp 75 -- n/a n/a n/a -- 3 --

N11b San Shek Wan 75 -- n/a n/a n/a -- 3 --

N11c San Shek Wan 75 -- n/a n/a n/a -- 3 --

N12a Lo Uk Tsuen 75 18 Sewage Pumping Station - Shui Hau 111 165 -52 3 62

N12b Lo Uk Tsuen 75 -- n/a 111 n/a -- 3 --

N12c Lo Uk Tsuen 75 -- n/a 111 n/a -- 3 --

N13 Pui O San Wai Tsuen 75 -- n/a n/a n/a -- 3 --

N14 South Lantau Community Centre 75 -- n/a n/a n/a -- 3 --

N15a Pui O Lo Wai Tsuen 75 -- n/a n/a n/a -- 3 --

N15b Pui O Lo Wai Tsuen 75 -- n/a n/a n/a -- 3 --

N16a Ham Tin San Tsuen 75 -- n/a n/a n/a -- 3 --

N16b Ham Tin San Tsuen 75 -- n/a n/a n/a -- 3 --

N17 Bui O Public School 70/65 -- n/a n/a n/a -- 3 --

Notes:

[1] 70/65 Noise criteria during normal school days / examination period

[2] Distance more than 300m from the works area were not assessed

[3] Distance Correction for PMEs = 10*log(2*PI*r2)

[4] The figures are rounded-up to a whole number.

[5] Only potentail noise impact from land-based works is assessed as no NSRs were identified within 300m of the marine based works area.

Annex 8B-3g : Construction Noise Assessment - Predicted Noise Levels from Construction of Submarine Outfall

(Without Mitigation)

Predicted CNL,

dB(A)[4]

EIAO-TM

Noise

Criteria,

dB(A) [1]

Page 20: ANNEX 8B Construction Noise Impact Assessment · 15 Sewage Pumping Station - Tong Fuk YYYYYYYYYYYYYYYYY 16 Sewage Pumping Station - Shui Hau YYYYYYYYYYYYYY Y Y

Annex 8B-4a : Construction Noise Assessment - Predicted Maximum Cumulative Noise Levels from Construction of Trunk Sewers/Rising Mains and Sewage Pumping Station (Without Mitigation)

Predicted CNL, dB(A)[2][3][4]

Predicted Maximum Cumulative CNL, dB(A)[2][3][4]

Trunk Sewers/Rising Mains SPS [6] Trunk Sewers/Rising Mains

NSR Location EIAO-TM

Noise

Criteria

Sawcutting

pavement

Breaking

up of

pavement

Excavation

/ Shoring

Pipe

laying

Backfilling Reinstatement

(concrete)

Reinstatement

(asphalt)

Painting of

road

marking

Sawcutting

pavement

Breaking

up of

pavement

Excavation

/ Shoring

Pipe

laying

Backfilling Reinstatement

(concrete)

Reinstatement

(asphalt)

Painting of

road

marking

dB(A)[1] a) b) c) d) e) f) g) h) a) b) c) d) e) f) g) h)

N01c Shui Hau Village 75 77 84 75 67 70 71 75 53 70 78 84 77 72 73 74 76 70

N03a Tong Fuk Village 75 88 95 87 78 81 82 86 65 74 88 95 87 80 82 83 86 75

N03b Tong Fuk Village 75 86 93 85 76 79 81 84 63 68 86 93 85 77 80 81 84 69

N05a Residences at Cheung Fu Street 75 82 89 81 72 75 76 80 59 88 89 92 89 88 88 88 89 88

N05b Residences at Cheung Fu Street 75 83 90 82 73 76 78 81 60 64 83 90 82 74 77 78 81 65

N06 WSD Quarter 75 76 83 75 66 70 71 74 53 60 77 83 75 67 70 71 74 61

N07 Government Holiday Bungalows 75 81 88 80 71 74 76 79 58 67 82 88 80 73 75 76 80 68

N08 Cheung Sha Ha Tsuen 75 79 86 77 69 72 73 76 55 79 82 86 81 79 79 80 81 79

N09 Cheung Sha Sheung Tsuen 75 79 86 77 69 72 73 76 55 62 79 86 77 70 72 73 77 63

N11a YMCA Youth Camp 75 84 91 83 74 77 79 82 61 62 84 91 83 75 77 79 82 64

N11b San Shek Wan 75 86 93 85 76 79 81 84 63 74 87 93 85 78 80 81 85 74

N14 South Lantau Community Centre 75 93 100 92 83 86 88 91 70 61 93 100 92 83 86 88 91 70

N16a Ham Tin San Tsuen 75 85 92 83 75 78 79 82 61 65 85 92 83 75 78 79 83 67

N16b Ham Tin San Tsuen 75 82 89 81 72 75 76 80 59 63 82 89 81 72 75 76 80 64

Notes:

[1] 70/65 Noise criteria during normal school days / examination period

[2] Distance more than 300m from the works area were not assessed

[3] Distance Correction for PMEs = 10*log(2*PI*r2)

[4] The figures are rounded-up to a whole number.

[5] 76 Predicted Noise Level exceeded the corresponding EIAO-TM noise criteria.

[6] Maximum predicted CNL, please refer to Annex 8D-6d & 8D-6e for detailed calculation

Page 21: ANNEX 8B Construction Noise Impact Assessment · 15 Sewage Pumping Station - Tong Fuk YYYYYYYYYYYYYYYYY 16 Sewage Pumping Station - Shui Hau YYYYYYYYYYYYYY Y Y

Annex 8B-4b: Construction Noise Assessment - Predicted Maximum Cumulative Noise Levels from Construction of Trunk Sewers/Rising Mains, Sewage Treatment Works and Submarine Outfall (Without Mitigation)

Predicted CNL, dB(A)[2][3][4]

Predicted Maximum Cumulative CNL, dB(A)[2][3][4]

Trunk Sewers/Rising Mains STW Trunk Sewers/Rising Mains

NSR Location EIAO-TM

Noise

Criteria

Sawcutting

pavement

Breaking

up of

pavement

Excavation

/ Shoring

Pipe

laying

Backfilling Reinstatement

(concrete)

Reinstatement

(asphalt)

Painting of

road

marking

Sawcutting

pavement

Breaking

up of

pavement

Excavation

/ Shoring

Pipe

laying

Backfilling Reinstatement

(concrete)

Reinstatement

(asphalt)

Painting of

road

marking

dB(A)[1] a) b) c) d) e) f) g) h) a) b) c) d) e) f) g) h)

N12a Lo Uk Tsuen 75 80 87 78 70 73 74 77 56 77 62 81 87 81 78 78 79 80 77

N12b Lo Uk Tsuen 75 89 96 88 79 82 84 87 66 68 -- 89 96 88 80 83 84 87 70

Notes:

[1] 70/65 Noise criteria during normal school days / examination period

[2] Distance more than 300m from the works area were not assessed

[3] Distance Correction for PMEs = 10*log(2*PI*r2)

[4] The figures are rounded-up to a whole number.

[5] 76 Predicted Noise Level exceeded the corresponding EIAO-TM noise criteria.

Submarine