What is Automation ?
Automation is basically the delegation of human control
function to technical equipment for
Increasing Productivity
Increasing Quality
Reducing Cost
Increasing Safety in working conditions
ANKIT SHARMA 3
8/4/2019 Ankit sharma PTS
4/37
Productivity
Quality Labour Cost
Plant
Total Automation Manufacturing
Competitiveness
Solution
Automation applied to plant
ANKIT SHARMA 4
8/4/2019 Ankit sharma PTS
5/37
Manual Control
Hard wired logic Control
Electronic Control using Logic GatesProgrammable Logic Controller
ANKIT SHARMA 5
8/4/2019 Ankit sharma PTS
6/37
A Programmable logical controller is a specializedcomputer used to control machines and processes.
It uses a programmable memory to storeinstructions and specific functions that includeON/OFF control ,sequencing, arithmetic and datahandling.
ANKIT SHARMA 6
8/4/2019 Ankit sharma PTS
7/37
Reduced space Energy saving
Ease of maintenance Economical Greater life & reliability Tremendous flexibility
Shorter project time Easier storage, archiving and documentation
ANKIT SHARMA 7
8/4/2019 Ankit sharma PTS
8/37
Too much work required in connecting wires.
Difficulty with changes or replacements.
Difficulty in finding errors; requiring skillful workforce.
ANKIT SHARMA 8
http://upload.wikimedia.org/wikipedia/commons/2/2c/Automate_siemens_codeur_analyseur_de_trame.JPG8/4/2019 Ankit sharma PTS
9/37
The PLC is programmed interface between the field I/p element
like limit switches, sensors, push button and the final control
elements like actuator, solenoid/control valves, drives,
hooters etc
PLC consist of :-
1. Power Supply
2. CPU with Processor and Program memory
3. Input Module4. Output Module
5. Comm Port
6. Programming Device [PC/Laptop]
ANKIT SHARMA 9
8/4/2019 Ankit sharma PTS
10/37
ANKIT SHARMA 10
1. SMALL - it covers units with up to 128 I/Os and memories up to 2
Kbytes.
- these PLCs are capable of providing simple to advance
levels or machine controls.
2. MEDIUM - have up to 2048 I/Os and memories up to 32 Kbytes.
3. LARGE - the most sophisticated units of the PLC family. They have
up to 8192 I/Os and memories up to 750 Kbytes.
- can control individual production processes or entire
plant.
PLC Size
8/4/2019 Ankit sharma PTS
11/37
ANKIT SHARMA 11
Hardware configuration
A pictorial view---
Powersupply
CPUSignal Module
8/4/2019 Ankit sharma PTS
12/37
Configuration of PLC : Siemens
CPU
External Power
Supply
I/O Modules
ANKIT SHARMA 12
8/4/2019 Ankit sharma PTS
13/37
8/4/2019 Ankit sharma PTS
14/37
ANKIT SHARMA 14
Configuration of PLC : Modicon
8 Analog Inputs 1Analog Output
Up/Down FastCounter
Up Counter
Programming Terminal PC Connection
Unitelway Port for connectionof up to 5 Slaves PCMCIA memory expansion port
PCMCIA communications port
Built in display for I/O(in-rack, AS-i) and Diag
I/O Modules
8/4/2019 Ankit sharma PTS
15/37
Function block diagrams (FBDs)
Structured text (ST)Instruction List (IL)
Sequential function charts (SFCs)
Ladder logic.
ANKIT SHARMA 15
8/4/2019 Ankit sharma PTS
16/37
In PLC programming things (I\O) are Either True Or
FalseIn case the inputs are true the rung becomes true and
an output occurs.
It is a graphical language very popular for
programming
ANKIT SHARMA 16
8/4/2019 Ankit sharma PTS
17/37
Power flows through these contacts when they
are closed. The normally open (NO) is true whenthe input or output status bit controlling the
contact is 1. The normally closed (NC) is true
when the input or output status bit controlling
the contact is 0.
ANKIT SHARMA 17
8/4/2019 Ankit sharma PTS
18/37
ANKIT SHARMA 18
8/4/2019 Ankit sharma PTS
19/37
ANKIT SHARMA 19
8/4/2019 Ankit sharma PTS
20/37
ANKIT SHARMA 20
8/4/2019 Ankit sharma PTS
21/37
ANKIT SHARMA 21
8/4/2019 Ankit sharma PTS
22/37
ANKIT SHARMA 22
8/4/2019 Ankit sharma PTS
23/37
Machine controls,
Packaging,
Material handling,similar Sequential task as well as Process control.
ANKIT SHARMA 23
8/4/2019 Ankit sharma PTS
24/37
Modicon
Allen Bradley
SiemensABB
Mitsubishi
GE FanucOmron
Messung
ANKIT SHARMA 24
8/4/2019 Ankit sharma PTS
25/37
SCADA is Supervisory Control and Data Acquisition SCADA refers to a system that collects data from
various sensors at factory or plant & then sends thisdata to central computer which manage or controldata.
SCADA is used to control chemical plant processes, oiland gas pipelines, electrical generation andtransmission equipment, manufacturing facilities,
water purification and distribution infrastructure, etc.
ANKIT SHARMA 25
8/4/2019 Ankit sharma PTS
26/37
Typically, there are three major elements that
make up a SCADA system:
The master terminal unit (MTU)
The remote terminal unit (RTU)
The communications equipment
ANKIT SHARMA 26
Basic System Components
8/4/2019 Ankit sharma PTS
27/37
The MTU is known as Master Transmission Unit
It is the heart of the system
The MTU communicates with other peripheraldevices in the facility like monitors, printers, andother
The primary interface to the operator is the
monitor or CRT . Representation of valves, pumps, etc. As incoming
data changes, the screen is updated
ANKIT SHARMA 27
8/4/2019 Ankit sharma PTS
28/37
Connected to sensors in the
process, converting sensor signal to digital
one and sending digital data to the
supervisory system. As the name suggest it is remotely located in
the plant that sends data to MTU.
Relationship between MTU and RTU is
typically defined as a master and slave.
The major difference between the MTU and
RTU is that the MTU initiates virtually all
communications between the two.ANKIT SHARMA 28
8/4/2019 Ankit sharma PTS
29/37
Communication equipment is required for bi-
directional communications between an RTU and the
MTU.
This can be done through public transmission media or
atmospheric means
SCADA systems are capable of communicating using a
wide variety of media such as Fiber optics, dial-up, or
dedicated voice grade telephone lines, or radio
frequency ANKIT SHARMA 29
8/4/2019 Ankit sharma PTS
30/37
Features of typical SCADA software
Dynamic process graphic
Real-time and Historical trending Alarms
Recipe Management
Security
Device connectivity
Database connectivity
ANKIT SHARMA 30
8/4/2019 Ankit sharma PTS
31/37
ANKIT SHARMA 31
Example Alarm Page
8/4/2019 Ankit sharma PTS
32/37
Example Trending Chart
ANKIT SHARMA 32
8/4/2019 Ankit sharma PTS
33/37
Wonder ware : In Touch
Intellution : Fix DMACS
Merz : AspicAllen Bradley : Rsview
Siemens : WinCC
GE Fanuc : CimplicityKPIT : ASTRA
ANKIT SHARMA 33
8/4/2019 Ankit sharma PTS
34/37
ANKIT SHARMA 34
CONCLUSION
Using a SCADA system for their controls ensures a commonframework not only for the development of the specific applicationsbut also for operating the detectors. Operators experience the same"look and feel" whatever part of the experiment they control.However, this aspect also depends to a significant extent on properengineering.
PLC is an industrial computer control system that continuouslymonitors the state of input devices and makes decisions based upona custom program to control the state of output devices. A digitallyoperating electronic system, designed for use in an industrialenvironment, which uses a programmable memory for the internal
storage of user oriented instruction for implementing specificfunctions such as logic, sequencing, timing, counting, arithmetic, tocontrol various types of machines or processes through digital oranalog inputs.
8/4/2019 Ankit sharma PTS
35/37
SCADA and Industrial Automation Security,http://www.scadasec.nethttp://www.ea.doe.gov/pdfs/21stepsbooklet.pdf
Critical Infrastructure Protection: Challenges and Efforts to
Secure Control Systemshttp://www.gao.gov/new.items/d04354.pdf
Myths and Facts Behind Cyber Security of IndustrialControls http://www.pimaweb.org/conferences/
SCADA Gospel Archives (edited archives of the SCADAmailing list)http://members.iinet.net.au/~ianw/archive/book1
ANKIT SHARMA 35
8/4/2019 Ankit sharma PTS
36/37
ANKIT SHARMA 36
8/4/2019 Ankit sharma PTS
37/37