44
1 ANALYST BRIEFING Q4 FY2012 Financial Results & Updates Updated as at 26 February 2013

Analyst Briefing Q4 - upload copy - ChartNexusir.chartnexus.com/deleum/doc/presentation/Analyst... ·  · 2013-04-09Deleum Branch Office, Miri Asian Supply Base,Labuan Workshop Facilities,

Embed Size (px)

Citation preview

Page 1: Analyst Briefing Q4 - upload copy - ChartNexusir.chartnexus.com/deleum/doc/presentation/Analyst... ·  · 2013-04-09Deleum Branch Office, Miri Asian Supply Base,Labuan Workshop Facilities,

1

ANALYST BRIEFING

Q4 FY2012 Financial Results

& Updates

Updated as at 26 February 2013

Page 2: Analyst Briefing Q4 - upload copy - ChartNexusir.chartnexus.com/deleum/doc/presentation/Analyst... ·  · 2013-04-09Deleum Branch Office, Miri Asian Supply Base,Labuan Workshop Facilities,

2

CONTENTS

About Deleum

Business Activities

Highlights for the Year

Financial Highlights

Page 3: Analyst Briefing Q4 - upload copy - ChartNexusir.chartnexus.com/deleum/doc/presentation/Analyst... ·  · 2013-04-09Deleum Branch Office, Miri Asian Supply Base,Labuan Workshop Facilities,

3

ABOUT DELEUM

Page 4: Analyst Briefing Q4 - upload copy - ChartNexusir.chartnexus.com/deleum/doc/presentation/Analyst... ·  · 2013-04-09Deleum Branch Office, Miri Asian Supply Base,Labuan Workshop Facilities,

4

Page 5: Analyst Briefing Q4 - upload copy - ChartNexusir.chartnexus.com/deleum/doc/presentation/Analyst... ·  · 2013-04-09Deleum Branch Office, Miri Asian Supply Base,Labuan Workshop Facilities,

5

CORPORATE STATEMENT

To Provide Sustainable Growth and Enhance Stakeholders’Value

MISSION

VISIONTo be the Market Leader in our Operating Segmentsdomestically and to establish regional presence by 2015

SHARED VALUES

Integrity

Respect, Honesty, Ethics.

Professionalism

Accountability, Teamwork, Communication.

Health, Safety & Environment

Healthy/Balanced Lifestyle, Safety, Environment.

Excellence

Quality, Deliverance, Rewards.

Page 6: Analyst Briefing Q4 - upload copy - ChartNexusir.chartnexus.com/deleum/doc/presentation/Analyst... ·  · 2013-04-09Deleum Branch Office, Miri Asian Supply Base,Labuan Workshop Facilities,

6

ABOUT DELEUM

� Deleum Services Sdn. Bhd. (formerly known as

Delcom Services Sdn. Bhd. ) – est. in 1982

� PETRONAS licensed

� Long-term relationship with OEMs (> 20 years)

� Provides diverse range of specialised supporting

products and services for the Oil and Gas

Industry

� Relationships – Agency, JV and Self Operated

� Group strength – approx. 585 employees

Kemaman Supply Base,

Kemaman

Deleum Branch Office,

Miri

Asian Supply

Base,Labuan

Workshop Facilities,

Miri

Penaga Dresser,

Kemaman

Solar Turbines Integrated Overhaul

Facility,Senawang

Deleum Rotary

Services,Kajang

Deleum Head Office

Deleum Primera,Sg Besi

Page 7: Analyst Briefing Q4 - upload copy - ChartNexusir.chartnexus.com/deleum/doc/presentation/Analyst... ·  · 2013-04-09Deleum Branch Office, Miri Asian Supply Base,Labuan Workshop Facilities,

7

BOARD OF DIRECTORS

Nan Yusri Bin Nan Rahimy

Group Managing Director

Chin Kwai Yoong

Independent

Non-Executive Director

Lt General (R) Tan Sri Dato’ Seri Abdul Ghani Bin Abdul Aziz

Non-Independent Non-Executive Director

Dato’ Kamaruddin Bin Ahmad

Independent

Non-Executive Director

Datuk Ishak Bin Imam Abas

Independent

Non-Executive Director

Datuk Vivekananthan a/l

M. V. Nathan

Deputy Chairman

Dato’ Izham Bin Mahmud

Chairman

Page 8: Analyst Briefing Q4 - upload copy - ChartNexusir.chartnexus.com/deleum/doc/presentation/Analyst... ·  · 2013-04-09Deleum Branch Office, Miri Asian Supply Base,Labuan Workshop Facilities,

8

CORPORATE PROFILE

Deleum Berhad ProfileDeleum Berhad (Bursa: Deleum) is an investment holding

company and through its subsidiaries, provides a diverse

range of supporting specialised products and services for

the oil and gas industry, particularly the exploration and

production of oil and gas.

• Nan Yusri bin Nan Rahimy

Group Managing Director

• Zamani Abd Ghani

Group Chief Operating

Officer

• Heng Phok Wee

Chief Operating Officer

Deleum Services Sdn. Bhd.

• Ahmad Uzhir bin Khalid

Chief Operating Officer

Deleum Oilfield Services

Sdn. Bhd.

• Khairiri Abd Karim

Chief Operating Officer

Deleum Rotary Services Sdn.

Bhd.

• Lee Sew Bee

Senior General Manager

Corporate Services

• Jayanthi Gunaratnam

Senior General Manager

Finance, Administration &

Procurement

Key Management Team

Historical Price / Volume Chart (as at 26/02/2013)

Current Share Price (as at 26/02/13) RM1.90

Issued and Paid Up Capital 150 Million

Market Capitalisation (as at 26/02/13) RM285 Million

Shareholders Equity as at 31

December 2012

RM215 Million

Net Cash as at 31 December 2012 RM61.8 Million

Market Data

Page 9: Analyst Briefing Q4 - upload copy - ChartNexusir.chartnexus.com/deleum/doc/presentation/Analyst... ·  · 2013-04-09Deleum Branch Office, Miri Asian Supply Base,Labuan Workshop Facilities,

9

MILESTONES ACCOMPLISHED

1982198219821982 1985198519851985 1990199019901990 1995199519951995 2000200020002000 2005200520052005 2010201020102010 2012201220122012

(1982)

� Establishment of Deleum Services Sdn. Bhd. (DSSB)

(formerly known as Delcom Services Sdn. Bhd.)

(1999)

� Camco Inc acquired by Schlumberger

(2010)

� Acquisition of Deleum Rotary Services Sdn. Bhd. (formerly known as Rotary Technical Services Sdn. Bhd.) (DSSB’s wholly owned subsidiary)

(2007)

� Listed on Main Market Bursa Malaysia via investment holding entity Deleum Berhad

(2008)

� Establishment of Turbine Overhaul Facility

- Dedicated Solar Turbines Integrated Service Centre

� Acquisition of 51% equity interest of Penaga Dresser Sdn. Bhd. via 80% subsidiary Delcom Holdings Sdn. Bhd.

(1987)

� Establishment of Turboservices Sdn. Bhd. (TSSB)

- JV with Solar Turbines Inc. (After Market Salesfor Gas Turbines)

� Establishment of Camco (Malaysia) Sdn. Bhd. (CMSB)

- JV with Camco Inc.(Wireline & CompletionServices)

(2001)

� DSSB’s 49% acquisition of CMSB from Schlumberger

and assumed its current name of Deleum Oilfield ServicesSdn. Bhd. (formerly known as Delcom Oilfield ServicesSdn. Bhd.) (DSSB’s wholly owned subsidiary)

(2012)

� 30th Anniversary & Corporate

Rebranding

� Acquisition of 60% equity interest in Deleum Primera Sdn. Bhd. (formerly known as Northern Primera Sdn. Bhd.)

Page 10: Analyst Briefing Q4 - upload copy - ChartNexusir.chartnexus.com/deleum/doc/presentation/Analyst... ·  · 2013-04-09Deleum Branch Office, Miri Asian Supply Base,Labuan Workshop Facilities,

10

Deleum Services Sdn. Bhd.

100%

(formerly known as Delcom

Services Sdn. Bhd.)

Delflow Solutions Sdn. Bhd.

100%

Turboservices Overhaul

Sdn. Bhd.

100%

Deleum Services Holdings Limited

100%

(formerly known as Delcom Services Holdings

Limited)

Deleum Oilfield Services Sdn. Bhd.

100%

(formerly known as Delcom Oilfield Services

Sdn. Bhd.)

Deleum Chemicals Sdn. Bhd.

100%

(formerly known as Delcom Chemicals

Sdn .Bhd.)

VSM Technology Sdn. Bhd.

90%

Wisteria Sdn. Bhd.

100%

SledgeHammer Malaysia Sdn. Bhd.

100%

Deleum Rotary Services Sdn. Bhd.

100%

(formerly known as Rotary Technical Services

Sdn. Bhd.)

Turboservices Sdn. Bhd.

74%

Delcom Holdings Sdn. Bhd.

80%

Penaga Dresser Sdn. Bhd.

51%

Malaysian Mud And

Chemicals Sdn. Bhd.

32%

Delcom Power (Cambodia)

Limited

60%

Delcom Utilities (Cambodia)

Limited

60%

Cambodia Utilities

Pte. Ltd.

20%

Deleum Primera Sdn Bhd

60%

(formerly known as Northern Primera

Sdn. Bhd.)

GROUP CORPORATE STRUCTURE

Page 11: Analyst Briefing Q4 - upload copy - ChartNexusir.chartnexus.com/deleum/doc/presentation/Analyst... ·  · 2013-04-09Deleum Branch Office, Miri Asian Supply Base,Labuan Workshop Facilities,

11

BUSINESS ACTIVITIES

Page 12: Analyst Briefing Q4 - upload copy - ChartNexusir.chartnexus.com/deleum/doc/presentation/Analyst... ·  · 2013-04-09Deleum Branch Office, Miri Asian Supply Base,Labuan Workshop Facilities,

12

Oilfield Services

Maintenance, Repair and Overhaul

Power and

Machinery

CORE BUSINESS SEGMENTS

POWER AND MACHINERY

• Provision of gas turbine

packages

• Supply of gas turbines parts,

• Gas turbine overhaul,

maintenance and technical

services

• Combined heat and power

plant

• Supply, repair, maintenance

and installation of valves and

flow regulators

• Other production related

equipment services

OILFIELD SERVICES

• Provision of wireline

equipment and services

• Integrated wellhead

maintenance services

• Provision of oilfield

chemicals

• Other oilfield products

and technical services

MAINTENANCE, REPAIR AND OVERHAUL

• Repair, servicing, maintenance and overhaul of motors, generators, transformers, pumps

• Integrated corrosion, inspection and mitigation for surface preparation

• Composite repair and structural integrity

Page 13: Analyst Briefing Q4 - upload copy - ChartNexusir.chartnexus.com/deleum/doc/presentation/Analyst... ·  · 2013-04-09Deleum Branch Office, Miri Asian Supply Base,Labuan Workshop Facilities,

13

BUSINESS ACTIVITIES

Page 14: Analyst Briefing Q4 - upload copy - ChartNexusir.chartnexus.com/deleum/doc/presentation/Analyst... ·  · 2013-04-09Deleum Branch Office, Miri Asian Supply Base,Labuan Workshop Facilities,

POWER AND MACHINERY

Page 15: Analyst Briefing Q4 - upload copy - ChartNexusir.chartnexus.com/deleum/doc/presentation/Analyst... ·  · 2013-04-09Deleum Branch Office, Miri Asian Supply Base,Labuan Workshop Facilities,

15

POWER AND MACHINERY

We possess the capability to supply:

� complete life cycle support of gas turbine

generators and compressor packages

• Approximately 250 gas turbine

packages installed

�Turnkey / EPCC solutions

• CHP plants – Malaysian Mosaic Limited

& Muda Paper Mill, Petronas Fertiliser

• District cooling plant – KLCC, UTP,

Putrajaya

�Total life cycle support of valves and flow

regulators

� Provision of umbilical, piping insulation

solutions and mooring system

� Provision of floating production systems

Page 16: Analyst Briefing Q4 - upload copy - ChartNexusir.chartnexus.com/deleum/doc/presentation/Analyst... ·  · 2013-04-09Deleum Branch Office, Miri Asian Supply Base,Labuan Workshop Facilities,

16

� INTEGRATED SERVICES CENTRE

� Invested plant and equipment > RM 20 mil

� Sitting on 3.5 acres site (30k sqft built-up

area)

� Equipped with advanced simulators and

training skids

� Capabilities

• Turbine overhaul

• Component repair & remanufacture

• Stocking

• Retrofits

• Training

• Regional turbine packages

POWER AND MACHINERY (Cont’d)

Page 17: Analyst Briefing Q4 - upload copy - ChartNexusir.chartnexus.com/deleum/doc/presentation/Analyst... ·  · 2013-04-09Deleum Branch Office, Miri Asian Supply Base,Labuan Workshop Facilities,

OILFIELD SERVICES

Page 18: Analyst Briefing Q4 - upload copy - ChartNexusir.chartnexus.com/deleum/doc/presentation/Analyst... ·  · 2013-04-09Deleum Branch Office, Miri Asian Supply Base,Labuan Workshop Facilities,

18

OILFIELD SERVICES

Deleum’s Oilfield Services segment specialises mainly in upstream operations, topside

and downhole support services consisted of the following:

� Provision of wireline equipment and

logging services

� Completion services

� Integrated wellhead maintenance

services

� Oilfield chemical

� Other oilfield products and technical

services

� Decommissioning of platforms and wells

Page 19: Analyst Briefing Q4 - upload copy - ChartNexusir.chartnexus.com/deleum/doc/presentation/Analyst... ·  · 2013-04-09Deleum Branch Office, Miri Asian Supply Base,Labuan Workshop Facilities,

19

OILFIELD SERVICES

Page 20: Analyst Briefing Q4 - upload copy - ChartNexusir.chartnexus.com/deleum/doc/presentation/Analyst... ·  · 2013-04-09Deleum Branch Office, Miri Asian Supply Base,Labuan Workshop Facilities,

20

� SPECIALTY CHEMICALS

OILFIELD SERVICES (Cont’d)

� Signed Joint Commercialisation Agreement with

PETRONAS to jointly undertake commercialisation

activities in respect of the thermo-chemical

solution, SolidClenz™ (formerly referred as SDTT)

on 3 November 2011

� SolidClenz™ - a thermo-chemical solution for

organic deposit treatment in and around wellbore

for production enhancement

New Development

� Subsequent to the success, more solutions were

developed, as follows:

• Del-Clean – to dissolve and disperse inorganic

scale along with organic deposits

• Antifoulant GP/HX – for online chemical

treatment in crude or gas processing units

Page 21: Analyst Briefing Q4 - upload copy - ChartNexusir.chartnexus.com/deleum/doc/presentation/Analyst... ·  · 2013-04-09Deleum Branch Office, Miri Asian Supply Base,Labuan Workshop Facilities,

MAINTENANCE, REPAIRAND OVERHAUL (MRO)

Page 22: Analyst Briefing Q4 - upload copy - ChartNexusir.chartnexus.com/deleum/doc/presentation/Analyst... ·  · 2013-04-09Deleum Branch Office, Miri Asian Supply Base,Labuan Workshop Facilities,

22

MAINTENANCE, REPAIR AND OVERHAUL

� Primary Focus:

� Servicing, repair and maintenance of motors,

generators, transformers, pumps, valves (via Deleum

Rotary Services Sdn. Bhd.)

� Integrated corrosion, inspection and mitigation for

surface preparation (via Deleum Primera Sdn. Bhd.)

� Composite repair integrity for pipeline and structure for

oil and gas as well as general industries. (via Deleum

Rotary Services Sdn. Bhd.)

� IECEx certified from Simtars, Australia

� Expertise/ Capabilities

� Repair, services & maintenance

� Motors

� Genset, transformers, etc

� Electrical generation & transmission equipment

� Service & repairs for rotating equipment

� Engineering & design capabilities

� Turnkey/ Integrated maintenance service

� Service Facilities – Kajang, Pasir Gudang

Page 23: Analyst Briefing Q4 - upload copy - ChartNexusir.chartnexus.com/deleum/doc/presentation/Analyst... ·  · 2013-04-09Deleum Branch Office, Miri Asian Supply Base,Labuan Workshop Facilities,

RECOGNITIONS AND AWARDS

Page 24: Analyst Briefing Q4 - upload copy - ChartNexusir.chartnexus.com/deleum/doc/presentation/Analyst... ·  · 2013-04-09Deleum Branch Office, Miri Asian Supply Base,Labuan Workshop Facilities,

24

AWARDS FOR YEAR 2012

Best Contractor Performance

SCM – Contractors Management

Sharing Session

23 May 2012

Shell Goal Zero Award

Achieving 1,620 days without

any recordable accident

8 June 2012

PCSB SBO/SKO Contractors

Senior Management HSE

Forum Q2 FY 2012

25 June 2012

Page 25: Analyst Briefing Q4 - upload copy - ChartNexusir.chartnexus.com/deleum/doc/presentation/Analyst... ·  · 2013-04-09Deleum Branch Office, Miri Asian Supply Base,Labuan Workshop Facilities,

25

AWARDS FOR YEAR 2012 (Cont’d)

“Most Active Carigali Behavioral

Safety” Reporter

PCSB SBO/SKO Contractors

Senior Management HSE Forum

25 June 2012

Certificate of Appreciation

“SWI 1 Million Manhours without LTI”

16 July 2012

Page 26: Analyst Briefing Q4 - upload copy - ChartNexusir.chartnexus.com/deleum/doc/presentation/Analyst... ·  · 2013-04-09Deleum Branch Office, Miri Asian Supply Base,Labuan Workshop Facilities,

26

CERTIFICATIONS OBTAINED DURING YEAR 2012

International Electrotechnical Commission Explosive (IECEX)

CertificationDeleum Rotary Services Sdn. Bhd.

24 April 2012

Competence Management SystemDeleum Oilfield Services Sdn. Bhd.

18 January 2012

Page 27: Analyst Briefing Q4 - upload copy - ChartNexusir.chartnexus.com/deleum/doc/presentation/Analyst... ·  · 2013-04-09Deleum Branch Office, Miri Asian Supply Base,Labuan Workshop Facilities,

27

HIGHLIGHTS FOR THE YEAR

Page 28: Analyst Briefing Q4 - upload copy - ChartNexusir.chartnexus.com/deleum/doc/presentation/Analyst... ·  · 2013-04-09Deleum Branch Office, Miri Asian Supply Base,Labuan Workshop Facilities,

28

HIGHLIGHTS OF THE YEAR 2012

� Attainment of OPITO - Competence Management System Certification (OPITO-CMS)

� Deleum Oilfield Service Sdn Bhd (DOSSB) was

accorded an outright approval from OPITO on the

Competence Management System in January 2012

� First wireline company in Asia which received such

recognition and certification

� Competence Management System (CMS)

• A set of standards defining the competences

which apply to particular job roles

• Defines how a task is performed and the

necessary underpinning knowledge and

understanding required to deal with any

unexpected circumstances which could arise

Page 29: Analyst Briefing Q4 - upload copy - ChartNexusir.chartnexus.com/deleum/doc/presentation/Analyst... ·  · 2013-04-09Deleum Branch Office, Miri Asian Supply Base,Labuan Workshop Facilities,

29

HIGHLIGHTS OF THE YEAR 2012

� Development of the Training Well Facility

� Following the attainment of OPITO-CMS,

DOSSB had successfully commissioned the

first Training Well Facility at Asian Supply

Base in Labuan, Malaysia

� Serves as a training platform providing

simulated work environment

� The Training Well Facility is also made

available to external parties for training,

testing and etc

� Group’s commitments:

• To ensure workforce’s competency &

safety

• To provide quality service to all customers

Page 30: Analyst Briefing Q4 - upload copy - ChartNexusir.chartnexus.com/deleum/doc/presentation/Analyst... ·  · 2013-04-09Deleum Branch Office, Miri Asian Supply Base,Labuan Workshop Facilities,

30

HIGHLIGHTS OF THE YEAR 2012

� 1 For 2 Bonus Issue

� Increase the capital base of Deleum to a level which will better reflect the

Deleum Group’s current scale of operations.

� Reward to shareholders for their continuous support to the Deleum Group.

� To increase liquidity of the Deleum shares.

� Market capitalisation has increased from RM143 million (15/03/2012) to RM268

million (21/02/2013).

� 30th Anniversary and Corporate Rebranding

� In conjunction with the Group’s 30th Anniversary,

Deleum consolidated its business focus under a single

corporate identity.

� The subsidiaries have been rebranded as follows:

Page 31: Analyst Briefing Q4 - upload copy - ChartNexusir.chartnexus.com/deleum/doc/presentation/Analyst... ·  · 2013-04-09Deleum Branch Office, Miri Asian Supply Base,Labuan Workshop Facilities,

31

HIGHLIGHTS OF THE YEAR 2012

� Deleum Primera is involved in providing

services in integrated corrosion,

inspection and mitigation, primarily

using Sponge-Jet products.

� The acquisition was completed on 5

October 2012. Accordingly, Deleum

Primera is now a 60% owned subsidiary

of the Group.

� Rationale of the Acquisition:

� Provides another another revenue stream for the Deleum Group

� Synergises with the Deleum Group’s business as Deleum Primera’s existing

customers are mainly the targeted customers of the MRO segment

� Expansion of MRO’s segment’s scope of services

� Provides a gateway for Deleum Group to venture into Indonesia market

� Acquisition of Deleum Primera Sdn. Bhd. (“Deleum Primera”)

Page 32: Analyst Briefing Q4 - upload copy - ChartNexusir.chartnexus.com/deleum/doc/presentation/Analyst... ·  · 2013-04-09Deleum Branch Office, Miri Asian Supply Base,Labuan Workshop Facilities,

32

HIGHLIGHTS OF THE YEAR 2012

� Revamped Website

� Deleum is committed to continuously improving the way we communicate with our

stakeholders.

� The website has been redeveloped to provide a more detailed, relevant, interactive

and accessible site.

� The new site features a fresh design, focused on delivering information pertaining to

our products and services in easy to navigate, user-friendly features which are broadly

classified into six sections:

� Corporate Information

� Core Businesses

� Investor Relations

� Media

� Events

� Careers

Page 33: Analyst Briefing Q4 - upload copy - ChartNexusir.chartnexus.com/deleum/doc/presentation/Analyst... ·  · 2013-04-09Deleum Branch Office, Miri Asian Supply Base,Labuan Workshop Facilities,

33

DIVIDEND

Dividend PolicyDeleum’s dividend policy is of distributing

gross dividend of 50% of the Group’s annual

profit attributable to the equity holders of

the Company, subject to the availability of

adequate distributable reserves, operating

cash flow requirements, financial

commitments, expansion plans and other

relevant factors.

11.012.0 11.5

14.015.0

47%45%

49% 48% 50.6%

0%

10%

20%

30%

40%

50%

60%

0.0

5.0

10.0

15.0

20.0

25.0

2008 2009 2010 2011 2012(unaudited)

Div

idend P

ayout

Rati

o (

%)

Div

idend P

er

Share

(Sen)

Dividend Per Share (Sen) Dividend Payout Ratio (%)

Year ended 31 December FY2011 FY2012

First interim (sen) 5 5

Second interim (sen) 9 10

Total dividend payout per share (sen) 14 15

Total share capital (no. of shares) 100,000,000 150,000,000

Total dividend payout / dividend declared RM14,000,000 RM22,500,000

Dividend Payout History

Comparison of Dividend Payout for FY2011 Vs Dividend Payout/Declared for FY2012

Page 34: Analyst Briefing Q4 - upload copy - ChartNexusir.chartnexus.com/deleum/doc/presentation/Analyst... ·  · 2013-04-09Deleum Branch Office, Miri Asian Supply Base,Labuan Workshop Facilities,

34

RECENT CORPORATE

DEVELOPMENT

Page 35: Analyst Briefing Q4 - upload copy - ChartNexusir.chartnexus.com/deleum/doc/presentation/Analyst... ·  · 2013-04-09Deleum Branch Office, Miri Asian Supply Base,Labuan Workshop Facilities,

35

RECENT CORPORATE DEVELOPMENT

� Potential Subscription of equity interest in NSE Resources Corporation (M) Sdn Bhd (“NSERC”)

� Deleum has accepted an offer from NSERC for Deleum to subscribe a percentage

equity interest in NSERC.

� The principal activities of NSERC Group are in the provision of specialty

chemicals and renewable energy.

� The Potential Subscription

is currently undergoing the

necessary due diligence

review

Page 36: Analyst Briefing Q4 - upload copy - ChartNexusir.chartnexus.com/deleum/doc/presentation/Analyst... ·  · 2013-04-09Deleum Branch Office, Miri Asian Supply Base,Labuan Workshop Facilities,

36

FINANCIAL HIGHLIGHTS

Page 37: Analyst Briefing Q4 - upload copy - ChartNexusir.chartnexus.com/deleum/doc/presentation/Analyst... ·  · 2013-04-09Deleum Branch Office, Miri Asian Supply Base,Labuan Workshop Facilities,

37

FINANCIAL HIGHLIGHTS

REVENUE/PBT/PATAMI

425.1 514.3 399.0 396.3 473.2

36.9

45.7

37.6

45.7

67.5

23.326.5

23.2

29.0

44.5

10.0

20.0

30.0

40.0

50.0

60.0

70.0

80.0

0

100

200

300

400

500

600

2008 2009 2010 2011 2012(unaudited)

PBT

/PA

TA

MI (R

M M

illion)

Revenue (

RM

Million)

Revenue PBT PATAMI

� Revenue has increased by RM76.9 million or 19.4% year on year while PBT has increased by RM21.8 million or 47.6%

year on year largely due to the improved contributions made by ALL segments (details of which are described in

the following slides.

Page 38: Analyst Briefing Q4 - upload copy - ChartNexusir.chartnexus.com/deleum/doc/presentation/Analyst... ·  · 2013-04-09Deleum Branch Office, Miri Asian Supply Base,Labuan Workshop Facilities,

38

11.012.0 11.5

14.015.0

47%45%

49% 48% 50.6%

0%

10%

20%

30%

40%

50%

60%

0.0

5.0

10.0

15.0

20.0

25.0

2008 2009 2010 2011 2012(unaudited)

Div

idend P

ayout

Rati

o (

%)

Div

idend P

er

Share

(Sen)

Dividend Per Share (Sen) Dividend Payout Ratio (%)

GROUP CASH & BORROWINGSPROPERTIES, EQUIPMENT & TOTAL FIXED ASSETS

FINANCIAL HIGHLIGHTS

EMPLOYEES DIVIDEND

36

6258

71

81

6

2522

27

19

30

37 36

44

62

0

10

20

30

40

50

60

70

80

90

2008 2009 2010 2011 2012(unaudited)

(RM

Million)

Total Cash Total Borrowings Net Cash

253

391

456

510

585

0

100

200

300

400

500

600

700

2008 2009 2010 2011 2012

No.

of

Em

plo

yee

18 20 20 19 19

42

75 75 81 80

62

95 94100 99

0

20

40

60

80

100

120

0

20

40

60

80

100

120

2008 2009 2010 2011 2012(unaudited)

Tota

l Fix

ed A

ssets

(R

M M

illion)

Pro

pert

ies/

Equip

ment

(RM

M

illion)

Properties Equipment Total Fixed Assets

Page 39: Analyst Briefing Q4 - upload copy - ChartNexusir.chartnexus.com/deleum/doc/presentation/Analyst... ·  · 2013-04-09Deleum Branch Office, Miri Asian Supply Base,Labuan Workshop Facilities,

39

QUARTERLY RESULTS FOR Q4 FY2012

REVENUE/PBT/PATAMI � Revenue increased by 45.7% from the previous year’s

corresponding Q4

� Power & Machinery segment increased by RM55.1 million

mainly attributable to:

� supply of new refurbishment equipment for a retrofit

project

� overhauling activities

� maintenance and installation of valves and flow

regulators

� Oilfield Services segment experienced a reduction in

revenue by RM12.3 million due to:

� lower wireline and survey job utilisation

� lower demand for centralizers

� MRO segment experienced an increase in revenue by

RM6.0 million due to the inclusion of Deleum Primera’s

post acquisition revenue of RM5.1 million upon

completion of the acquisition

� PBT increased by 54.6% from the previous year’s corresponding Q4

� Higher operating profit of RM7.8 million arising from the Power & Machinery segment on the back of higher

revenue

� Improvement of MRO segment attributable to the inclusion of Deleum Primera’s post acquisition results of RM0.5

million during the quarter under review.

106.5

155.2

12.5

19.3

7.2

13.5

-

5.0

10.0

15.0

20.0

25.0

-

20.0

40.0

60.0

80.0

100.0

120.0

140.0

160.0

180.0

31 Dec 2011 31 Dec 2012(unaudited)

PBT

/PA

TA

MI (R

M M

illion)

Revenue (

RM

Million)

Revenue Profit Before Tax PATAMI

Page 40: Analyst Briefing Q4 - upload copy - ChartNexusir.chartnexus.com/deleum/doc/presentation/Analyst... ·  · 2013-04-09Deleum Branch Office, Miri Asian Supply Base,Labuan Workshop Facilities,

40

CUMULATIVE Q4 FY2012 RESULTS

REVENUE/PBT/PATAMI � The cumulative Q4 revenue increased by 19.4% from the

previous financial year ended 2011(FY2011)

� The increase was due to higher contribution by Power &

Machinery segment of RM62.1 million, arising from:

� Increased demand from customers on the back of robust

exploration and production activities

� Increased sales mainly from retrofit projects and valves

and regulators

� Oilfield Services segment increase of RM11.0 million - due

to higher deployment of wireline equipment and related

products achieved in the first 6 months of the year

� MRO segment increased by RM3.8 million attributable to:

� Inclusion of Deleum Primera’s post acquisition revenue

of RM5.1 million upon completion of the acquisition

� Offset by the decline in revenue from Deleum Rotary by

RM1.3 million due to lower business activities

� PBT increased by RM21.8 million or 47.6% from FY2011

� The increase is largely due to:

� RM19.3 million from Power & Machinery segment – higher profit contribution on the back of robust exploration and

production activities

� Oilfield Services segment by RM1.2 million – contribution from oilfield chemicals and higher sales from wellhead

maintenance spares

� MRO segment by RM1.0 million – mainly attributable to inclusion of Deleum Primera’s results post completion and

lower losses recorded by Deleum Rotary

396.3

473.2

45.7

67.5

29.0

44.5

-

10.0

20.0

30.0

40.0

50.0

60.0

70.0

-

50.0

100.0

150.0

200.0

250.0

300.0

350.0

400.0

450.0

500.0

Year ended31 Dec 2011

Year ended31 Dec 2012(unaudited)

PBT

/PA

TA

MI (R

M M

illion)

Revenue (

RM

Million)

Revenue Profit Before Tax

Page 41: Analyst Briefing Q4 - upload copy - ChartNexusir.chartnexus.com/deleum/doc/presentation/Analyst... ·  · 2013-04-09Deleum Branch Office, Miri Asian Supply Base,Labuan Workshop Facilities,

41

SEGMENTAL REPORTING FOR Q4 FY2012

Segment Revenue Composition for Cumulative Q4 ended 31/12/2011

Segmental Reporting (External Revenue)

Segment Revenue Composition for Cumulative Q4 ended 31/12/2012

Q4 Ended 31/12/12

Q4 Ended 31/12/11

% ChangesCumulative Q4 Ended 31/12/12

Cumulative Q4 Ended 31/12/11

% Changes

RM'000 RM'000 RM'000 RM'000

Power and Machinery 139,061 83,984 65.6% 379,467 317,333 19.6%

Oilfield Services 7,695 20,030 -61.6% 76,938 65,956 16.7%

MRO 8,493 2,530 235.7% 16,835 13,014 29.4%

Total Group revenue 155,249 106,544 45.7% 473,240 396,303 19.4%

Power and Machinery

80.2%

Oilfield Services16.3%

MRO3.6%

Power and Machinery

80.1%

Oilfield Services16.6%

MRO3.3%

Page 42: Analyst Briefing Q4 - upload copy - ChartNexusir.chartnexus.com/deleum/doc/presentation/Analyst... ·  · 2013-04-09Deleum Branch Office, Miri Asian Supply Base,Labuan Workshop Facilities,

42

RECENT CORPORATE EVENTS

15 Mar 2012: 1 for 2 bonus

issue

22 May 2012: FY2012-1st

quarter results

24 May 2012: FY2011 Results & Announcement of entitlement date for bonus issue

14 Aug 2012: FY2012-2nd

quarter results, interim dividend and acquisition

of NPSB

3 Sep 2012: Appointment

of GCOO

1.84

1.55

1.83

1.67

1.43

26 Nov 2012: FY2012-3rd

quarter results

1.80

4 Jan 2013: Proposed equity subscription in

NSERC

1.91

Page 43: Analyst Briefing Q4 - upload copy - ChartNexusir.chartnexus.com/deleum/doc/presentation/Analyst... ·  · 2013-04-09Deleum Branch Office, Miri Asian Supply Base,Labuan Workshop Facilities,

43

CORPORATE DIRECTORY

Page 44: Analyst Briefing Q4 - upload copy - ChartNexusir.chartnexus.com/deleum/doc/presentation/Analyst... ·  · 2013-04-09Deleum Branch Office, Miri Asian Supply Base,Labuan Workshop Facilities,

44

Disclaimer:

•The content of this presentation includes materials which may be capable of being interpreted as forward-looking statements. Such statements are merely predictions, based on circumstances and reasonable assumptions which apply only at the date of such statements. Accordingly, no reliance should be placed on any forward-looking statement, express or implied, contained in this presentation.

•Forward-looking statements involve assumptions concerning various risks and uncertainties including, but not limited to, the Company’s development activities, the existence of competent management, the Company’s financial activities, the domestic and global economy, changes in applicable laws and regulations, the obtaining of approvals and stock market activity. Actual results, performance and levels of activity may differ significantly from those expressed or implied in any forward-looking statements. As such, the Company gives no assurances that any of the events anticipated by any forward-looking statements will actually occur, or what the actual outcome or results of such events will be. In addition, the Company gives no undertaking that it will update or alter any forward-looking statements, irrespective of what may transpire after such statement is made.

For more information, please visit us at www.deleum.com

Updated as at 26 February 2013