DAFTAR HARGA SATUAN BAHAN BANGUNAN NO BAHAN / MATERIAL SATUAN I. BAHAN / MATERIAL 1 Batu belah 15 - 20 cm / Rp 133,350 2 Batu pecah 2 - 3 cm / Rp 196,890 3 Batu pecah 1 - 2 cm / Rp 204,690 4 Batu pecah 0,5 - 1 cm / ciping / Rp 223,650 5 Abu batu / Rp 194,920 6 Minyak tanah / ltr Rp 14,400 7 Batu merah Kali Pucang / bj Rp 600 8 Batu merah Kudus klas I / bj Rp 810 9 Batu merah Karangsari / Clering / bj Rp 500 10 Batu tempel 10 x 20 cm / Rp 100,000 11 Batu tempel 20 x 20 cm / Rp 100,000 12 Batu lempeng / Rp 52,500 13 Pasir hurug / timbun / Rp 88,900 14 Pasir beton / Muntilan / Rp 241,000 15 Pasir pasang (lokal) / Rp 138,000 16 Tanah hurug / Rp 29,100 17 Tanah padas / Rp 29,800 18 S i r t u / Rp 115,000 19 Sirlak / onz Rp 20,000 20 Spritus / ltr Rp 9,800 21 S e m e n ( PC ) / kg Rp 1,520 22 Semen PC warna / kg Rp 11,250 23 Semen putih / kg Rp 2,180 24 Kapur / Rp 437,500 25 Cat besi (emco/dextro) / kg Rp 52,660 26 Cat kayu / kg Rp 50,500 27 Cat Tembok Mowilex utk luar ruangan / kg Rp 87,600 28 Cat Tembok Mowilex utk dalam ruangan (standar) / kg Rp 56,800 29 Cat Tembok Mowilex utk dalam ruangan (pastel) / kg Rp 102,500 HARGA SATUAN BAHAN 2013 m 3 m 3 m 3 m 3 m 3 m 2 m 2 m 2 m 3 m 3 m 3 m 3 m 3 m 3 m 3

Analisa Bidang Cipta Karya Tahun 2013 Revisi

Embed Size (px)

DESCRIPTION

rab

Citation preview

Page 1: Analisa Bidang Cipta Karya Tahun 2013 Revisi

DAFTAR HARGA SATUAN BAHAN BANGUNAN

NO BAHAN / MATERIAL SATUAN

I. BAHAN / MATERIAL

1 Batu belah 15 - 20 cm / Rp 133,350

2 Batu pecah 2 - 3 cm / Rp 196,890

3 Batu pecah 1 - 2 cm / Rp 204,690

4 Batu pecah 0,5 - 1 cm / ciping / Rp 223,650

5 Abu batu / Rp 194,920

6 Minyak tanah / ltr Rp 14,400

7 Batu merah Kali Pucang / bj Rp 600

8 Batu merah Kudus klas I / bj Rp 810

9 Batu merah Karangsari / Clering / bj Rp 500

10 Batu tempel 10 x 20 cm / Rp 100,000

11 Batu tempel 20 x 20 cm / Rp 100,000

12 Batu lempeng / Rp 52,500

13 Pasir hurug / timbun / Rp 88,900

14 Pasir beton / Muntilan / Rp 241,000

15 Pasir pasang (lokal) / Rp 138,000

16 Tanah hurug / Rp 29,100

17 Tanah padas / Rp 29,800

18 S i r t u / Rp 115,000

19 Sirlak / onz Rp 20,000

20 Spritus / ltr Rp 9,800

21 S e m e n ( PC ) / kg Rp 1,520

22 Semen PC warna / kg Rp 11,250

23 Semen putih / kg Rp 2,180

24 Kapur / Rp 437,500

25 Cat besi (emco/dextro) / kg Rp 52,660

26 Cat kayu / kg Rp 50,500

27 Cat Tembok Mowilex utk luar ruangan / kg Rp 87,600

28 Cat Tembok Mowilex utk dalam ruangan (standar) / kg Rp 56,800

29 Cat Tembok Mowilex utk dalam ruangan (pastel) / kg Rp 102,500

30 Cat Tembok Mowilex utk dalam ruangan (warna khusus) / kg Rp 93,750

31 Cat tembok Duluk luar / kg Rp 94,000

HARGA SATUAN BAHAN 2013

m3

m3

m3

m3

m3

m2

m2

m2

m3

m3

m3

m3

m3

m3

m3

Page 2: Analisa Bidang Cipta Karya Tahun 2013 Revisi

32 Cat tembok Duluk dalam / kg Rp 60,000

33 Cat Tembok Decolith/sintex / kg Rp 18,000

34 Plamur / kg Rp 14,600

35 Amplas / lbr Rp 12,240

36 M e n i / kg Rp 28,200

37 Kawat Galvanis 3 mm / kg Rp 23,700

38 Kawat Galvanis 4 mm / kg Rp 23,700

39 Baut Baja / kg Rp 17,160

40 Baja konstruksi / propil / kg Rp 17,000

41 Baja tulangan beton / besi beton / kg Rp 11,690

42 Paku usuk / reng / kg Rp 14,950

43 Kawat baja / bindrat / kg Rp 19,300

44 Multiplek 9 mm (90x220) / lbr Rp 134,000

45 Triplek 3 mm (90 x 220) / lbr Rp 50,500

46 Triplek 6 mm (90x220) / lbr Rp 80,000

47 Triplek 9 mm (90x220) / lbr Rp 134,500

48 Gypsum board tebal 9 mm / lbr Rp 61,000

49 Teakwood / lbr Rp 93,750

50 Lem kayu / kg Rp 16,000

51 T i r / kg Rp 21,900

52 A f d u n e r s / ltr Rp 11,970

53 Tegel abu -abu 30 x 30 cm / bj Rp 1,500

54 Tegel warna 30 x 30 cm / bj Rp 2,000

55 Tegel warna 20 x 20 cm / bj Rp 1,300

56 Tegel Plint (abu-abu) / bj Rp 1,900

57 Tegel wafel warna 20x20 cm / bj Rp 2,000

58 Tegel wafel warna 30x30 cm / bj Rp 2,000

59 Ubin keramik 40/40 putih (sekualitas Asia/Mulia) / bh Rp 8,600

60 Ubin keramik 40/40 warna (sekualitas Asia/Mulia) / bh Rp 10,200

61 Ubin keramik 30/30 cm putih (sekualitas Asia/Mulia) / bh Rp 4,300

62 Ubin keramik warna 20/20 (sekualitas Asia/Mulia) / bh Rp 2,100

63 Ubin keramik warna 30/30 (sekualitas Asia/Mulia) / bh Rp 4,800

64 Blok pafing tebal 6 cm lokal / Rp 41,900

65 Blok pafing tebal 8 cm lokal / Rp 45,700

66 Blok pafing warna tebal 6 cm lokal / Rp 43,000

67 Blok pafing warna tebal 8 cm lokal / Rp 46,000

68 Blok pafing blok tebal 6 cm K.225 / Rp 72,000

69 Blok pafing blok tebal 8 cm K.300 / Rp 112,800

70 Blok pafing blok tebal 8 cm K.400 / Rp 129,000

m2

m2

m2

m2

m2

m2

m2

Page 3: Analisa Bidang Cipta Karya Tahun 2013 Revisi

71 Kaca ryben 5 mm / Rp 88,500

72 Buis beton Ø 0,20 / m' Rp 50,000

73 Buis beton Ø 0,30 / m' Rp 68,000

74 Buis beton Ø 0,60 / m' Rp 134,000

75 Buis beton Ø 0,80 / m' Rp 244,000

76 Buis beton Ø 1,00 / m' Rp 399,000

77 Buis beton U 15 / m' Rp 33,000

78 Buis beton U 20 / m' Rp 43,000

79 Buis beton U 30 / m' Rp 55,000

80 Batu klingker / Terakota / Rp 162,500

81 Roster tanah merah / bh Rp 3,000

82 Kloset INA jongkok / bh Rp 121,000.00

83 Kloset duduk INA / bh Rp 430,000.00

84 Kloset duduk mono blok INA / bh Rp 1,063,000.00

85 Kloset duduk mono blok TOTO / bh Rp 1,575,000.00

86 Urinoir / bh Rp 350,000

87 Wastafel / bh Rp 269,000

88 Bak CuciPiring Stainles / bh Rp 191,000

89 Tempat sabun tanam / bh Rp 32,000

90 Floor drain / bh Rp 11,000

91 Seng BJLS 30 / Rp 48,500

92 Eternit kerang super / Rp 15,000

93 Asbes plat tb 2 mm / atrisco / Rp 18,000

94 Asbes plat tb 4 mm / Rp 16,000

95 Harplek plat tb 4 mm / Rp 18,750

96 Genting pres lokal / bh Rp 1,100

97 Genting pres Jatiwangi (kecil) tak berwarna / bh Rp 1,900

98 Genting pres Jatiwangi Natural (besar) / bh Rp 4,875

99 Genting pres Jatiwangi (sedang) / bh Rp 3,900

100 Genting bubung Jatiwangi tak berwarna / bh Rp 15,600

101 Genting bubung lokal / bh Rp 2,700

102 Genteng beton / bh Rp 4,500

103 Genteng bubungan beton / bh Rp 8,000

104 Genteng keramik / bh Rp 9,500

105 Genteng bubungan keramik / bh Rp 22,000

106 Kayu perancah dengan meranti / Rp 7,500,000

107 Kayu hutan / Rp 4,375,000

108 Kayu randu / Rp 900,000

109 Kayu Kruing / Rp 8,570,000

m2

m2

m2

m2

m2

m2

m2

m3

m3

m3

m3

Page 4: Analisa Bidang Cipta Karya Tahun 2013 Revisi

110 Kayu bengkirai / Rp 10,810,000

111 Kayu kanfer / Rp 9,650,000

112 Kayu Jati klas III / Rp 15,592,500

113 Kayu Jati klas II panjang > 3 m / Rp 18,000,000

114 Bambu / btg Rp 18,000

115 Tali ijuk / kg Rp 24,000

116 Sesek / gedek bambu / Rp 8,500

117 Kaca bening 5 mm / Rp 73,000

118 Kaca bening 3 mm / Rp 60,000

119 Seng aluminium / Rp 45,000

120 Kasa / Rp 19,000

121 Engsel pintu kuningan lokal / bh Rp 23,500

122 Engsel pintu biasa / bh Rp 13,000

123 Engsel Angin / set Rp 18,000

124 Engsel jendela / set Rp 12,000

125 Kunci tanam royal / sekualitas / bh Rp 122,500

126 Sloot / grendel pintu / bh Rp 5,500

127 Kunci tanam Kamar Mandi / bh Rp 37,500

128 Hak angin biasa / bh Rp 5,000

129 Hak angin lipat / bh Rp 8,000

130 Door Closer / bh Rp 156,000

131 Rel Pintu Dorong / bh Rp 198,000

132 Kran stainlesteel / bh Rp 47,000

133 Kaca nako bening komplit / mata Rp 51,000

134 Pipa PVC Ø 1/2" AW / m' Rp 5,200

135 Pipa PVC Ø 3/3" AW / m' Rp 6,500

136 Pipa PVC Ø 1" AW / m' Rp 8,300

137 Pipa PVC Ø 2" AW / m' Rp 17,800

138 Pipa PVC Ø 3" AW / m' Rp 36,000

139 Pipa PVC Ø 4" AW / m' Rp 54,000

140 Fiber glass plat / Rp 33,000

141 Fiber glass gelombang / Rp 38,000

142 Asbes Gelombang besar / lbr Rp 108,500

143 Asbes Gelombang kecil / lbr Rp 48,500

144 Nok stel kecil / bubungan gelombang kecil / m' Rp 62,500

145 Nok stel asbes / m' Rp 68,750

146 Skrup fizzer / bh Rp 1,100

147 Sealant / tube Rp 28,000

148 Pintu lipat tebal 5 mm / Rp 441,000

m3

m3

m3

m3

m2

m2

m2

m2

m2

m2

m2

m2

Page 5: Analisa Bidang Cipta Karya Tahun 2013 Revisi

149 Pintu lipat tebal 8 mm / Rp 567,000

150 Rolling door alumunium tebal 5 mm / Rp 346,500

151 Rolling door alumunium tebal 8 mm / Rp 378,000

152 Alumunium strip / Rp 35,000

153 Profil alumunium / m' Rp 104,900

154 Besi Strip 2 cm / Rp 20,600

155 Pagar BRC 90 x 240 Biasa / unit Rp 187,800

156 Pagar BRC 120 x 240 Biasa / unit Rp 238,000

157 Glass blox / bj Rp 20,000

158 Paku sumbat / kait / bj Rp 1,500

159 Seng plat BJLS 28 / lbr Rp 43,750

160 Seng plat BJLS 29 / lbr Rp 47,500

161 Seng Gelombang BJLS 28 / lbr Rp 78,500

162 Besi L 50 x 50 x 5 / Rp 38,400

163 Air / liter Rp 17

INSTALASI AIR BERSIH PERDESAAN/PERKOTAAN

a. " Pipa PVC "SII, S 12.5

Diameter nominal 1/2" / m' Rp 5,900

Diameter nominal 3/4" / m' Rp 7,200

Diameter nominal 1" / m' Rp 10,700

Diameter nominal 1 1/2" / m' Rp 18,600

Diameter nominal 2" / m' Rp 26,500

Diameter nominal 3" / m' Rp 60,900

Diameter nominal 4" / m' Rp 80,600

b. " Pipa Galvanis " medium

Diameter nominal 1/2" / m' Rp 22,100

Diameter nominal 3/4" / m' Rp 28,800

Diameter nominal 1" / m' Rp 44,400

Diameter nominal 1 1/2" / m' Rp 66,700

Diameter nominal 2" / m' Rp 88,900

Diameter nominal 3" / m' Rp 144,600

Diameter nominal 4" / m' Rp 211,400

Diameter nominal 6" / m' Rp 344,900

c. " Pipa PE "SDR 17 (PN.10)

Diameter nominal 1.1/2" / m' Rp 24,600

Diameter nominal 2" / m' Rp 39,600

Diameter nominal 2 1/2" / m' Rp 52,300

Diameter nominal 3" / m' Rp 78,800

m2

m2

m2

m2

m1

m'

Page 6: Analisa Bidang Cipta Karya Tahun 2013 Revisi

d. " Stop valve "

Diameter nominal 3/4" / Bh Rp 39,000

Diameter nominal 1" / Bh Rp 65,000

Diameter nominal 1 1/2" / Bh Rp 112,800

Diameter nominal 2" / Bh Rp 190,900

e. " Gate valve "

Diameter nominal 3" / Bh Rp 494,800

Diameter nominal 4" / Bh Rp 633,700

Diameter nominal 6" / Bh Rp 1,127,800

f. " Reduser " PVC

Diameter nominal 150 x 100 mm / Bh Rp 187,400

Diameter nominal 100 x 75 mm / Bh Rp 101,900

Diameter nominal 75 x 50 mm / Bh Rp 64,200

Diameter nominal 50 x 40 mm / Bh Rp 49,100

Diameter nominal 40 x 25 mm / Bh Rp 29,400

Diameter nominal 25 x 20 mm / Bh Rp 15,600

g. " Tee all socket " PVC

Diameter nominal 100 x 100 mm / Bh Rp 198,900

Diameter nominal 75 x 75 mm / Bh Rp 123,100

Diameter nominal 50 x 50 mm / Bh Rp 74,600

Diameter nominal 40 x 40 mm / Bh Rp 12,800

Diameter nominal 25 x 25 mm / Bh Rp 8,800

h. " Bend all socket " PVC

Diameter nominal 75 mm RRJ / Bh Rp 40,500

Diameter nominal 50 mm RRJ / Bh Rp 30,000

Diameter nominal 40 mm / Bh Rp 5,900

Diameter nominal 25 mm / Bh Rp 3,700

Diameter nominal 20 mm / Bh Rp 2,300

i. " Bend all socket " GI

Diameter nominal 2" / Bh Rp 11,500

Diameter nominal 1 1/2" / Bh Rp 9,200

Diameter nominal 1" / Bh Rp 6,000

Diameter nominal 3/4" / Bh Rp 3,400

j. " Clamp sadle " GI

Diameter nominal 3" x 3/4" / Bh Rp 26,000

Diameter nominal 2" x 3/4" / Bh Rp 17,300

Diameter nominal 1 1/2" x 3/4" / Bh Rp 13,700

Diameter nominal 1" x 3/4" / Bh Rp 13,700

k. " Valve socket " PVC

Page 7: Analisa Bidang Cipta Karya Tahun 2013 Revisi

Diameter nominal 50 mm / Bh Rp 17,300

Diameter nominal 40 mm / Bh Rp 7,400

Diameter nominal 25 mm / Bh Rp 3,400

Diameter nominal 20 mm / Bh Rp 2,300

l. " Flange socket " PVC

Diameter nominal 75 mm / Bh Rp 109,100

Diameter nominal 100 mm / Bh Rp 146,600

Diameter nominal 150 mm / Bh Rp 269,300

m. " Faucet socket " PVC

Diameter nominal 50 mm / Bh Rp 17,300

Diameter nominal 40 mm / Bh Rp 7,400

Diameter nominal 25 mm / Bh Rp 3,400

Diameter nominal 20 mm / Bh Rp 2,300

n. " D o f " PVC

Diameter nominal 100 mm / Bh Rp 26,900

Diameter nominal 75 mm / Bh Rp 15,700

Diameter nominal 50 mm / Bh Rp 7,400

Diameter nominal 40 mm / Bh Rp 5,900

Diameter nominal 25 mm / Bh Rp 3,700

Diameter nominal 20 mm / Bh Rp 2,300

o. " Water meter "

Diameter nominal 3" / Bh Rp 1,353,800

Diameter nominal 2" / Bh Rp 1,030,800

Diameter nominal 1" / Bh Rp 383,600

Diameter nominal 1/2" / Bh Rp 120,100

p. " Chek valve "

Diameter nominal 3" / Bh Rp 525,800

Diameter nominal 4" / Bh Rp 676,900

Diameter nominal 6" / Bh Rp 1,165,300

q. " Bend all flange " CI - 45'

Diameter nominal 3" / Bh Rp 99,600

Diameter nominal 4" / Bh Rp 137,800

Diameter nominal 6" / Bh Rp 222,100

r. " Air valve " CI

Diameter nominal 1" / Bh Rp 127,800

Diameter nominal 3/4" / Bh Rp 120,100

s. " Stred boox "

Diameter nominal 3" / Bh Rp 27,900

Diameter nominal 4" / Bh Rp 34,000

Page 8: Analisa Bidang Cipta Karya Tahun 2013 Revisi

t. "Accessories"

Doble neple GI dia 3/4" / Bh Rp 1,900

Tee all socket GI dia 3/4" / Bh Rp 5,100

Valve socket GI dia 3/4" / Bh Rp 2,800

Kran stainless steel / Bh Rp 20,600

Verlop ring 1 " x 3/4" / Bh Rp 9,200

Sock GIP dia 1" / Bh Rp 3,600

Sock GIP dia 3/4" / Bh Rp 2,800

Tee faucet dia 20 mm PVC / Bh Rp 5,900

Bend faucet dia 20 mm PVC / Bh Rp 3,700

Submersible pump 5.5 KW/1 Phase / Unit Rp 32,786,600

Submersible pump 11 KW/3 Phase / Unit Rp 59,617,600

Panel submersible pump 5.5 KW / Unit Rp 3,182,800

Panel submersible pump 11 KW / Unit Rp 5,209,300

Submersible pump 2.2 KW/1 Phase 1 Unit Rp 24,806,200

Panel submersible pump 2.2 KW 1 Unit Rp 2,480,600

Bend all sock GIP diameter 3" 1 Bh Rp 23,700

Tee all sock GIP diameter 3" 1 Bh Rp 19,800

Pasang tangga bahan pipa GIP dn 1" 1 Bh Rp 220,500

Tutup man hole & tutup pengaman lengkap 3 mm 1 Unit Rp 330,700

Speed Kran DN 20 mm 1 Bh Rp 20,600

Gate Valev DN 50 mm 1 Bh Rp 187,400

Flends diameter 150 mm 1 Bh Rp 110,200

Pelurus / Centering tiap 30 mm 1 set Rp 40,000

Reduser DN 100 x 150 mm 1 set Rp 565,800

Filter Grevel 1 m3 Rp 200,000

Grouting 1 m Rp 533,600

Tangki fiberglas kapasitas 1 m3 / m' Rp 4,398,900

Tangki fiberglas kapasitas 2 m3 / m' Rp 5,209,300

u. "Pembuatan Sumur Produksi"

Solar / ltr Rp 5,500

O l i e / ltr Rp 33,600

Bentonite / kg Rp 12,600

Veet/grease / kg Rp 36,700

Gravel pack / m3 Rp 193,200

Kawat las / btg Rp 900

Pipa jambang diameter 8" ( GI) / m' Rp 642,600

Pipa jambang diameter 6" (GI) / m' Rp 359,100

Pipa buta diamter 6" ( GI ) / m' Rp 344,400

Page 9: Analisa Bidang Cipta Karya Tahun 2013 Revisi

Pipa buta diamter 4" (GI ) / m' Rp 315,000

Pipa saringan stainless steel diameter 6" / m' Rp 1,911,000

Pipa saringan stainless steel diameter 4" / m' Rp 1,312,500

Page 10: Analisa Bidang Cipta Karya Tahun 2013 Revisi

DAFTAR UPAH TENAGA KERJA

NO JENIS TENAGA KERJA SATUAN

1 Mandor 1 hari Rp 54,000

2 Kepala tukang gali 1 hari Rp 60,000

3 Tukang gali / pekerja 1 hari Rp 42,000

4 Kepala tukang batu 1 hari Rp 60,000

5 Tukang batu 1 hari Rp 54,000

6 Laden tukang batu/pekerja 1 hari Rp 48,000

7 Kepala tukang kayu 1 hari Rp 60,000

8 Laden tukang kayu/pekerja 1 hari Rp 48,000

9 Tukang kayu 1 hari Rp 54,000

10 Kepala tukang besi 1 hari Rp 60,000

11 Tukang besi 1 hari Rp 54,000

12 Laden tukang besi/pekerja 1 hari Rp 48,000

13 Kepala tukang cat 1 hari Rp 60,000

14 Tukang cat 1 hari Rp 54,000

15 Laden tukang cat /pekerja 1 hari Rp 48,000

22 Mandor pipa 1 hari Rp 39,000

23 Tukang pipa 1 hari Rp 39,000

24 Laden tukang pipa/pekerja 1 hari Rp 28,500

33 Site manager 1 hari Rp 62,000

34 Geologist 1 hari Rp 55,500

35 Administrasi 1 hari Rp 49,000

36 Logistik 1 hari Rp 37,000

37 Operator pemboran 1 hari Rp 37,000

38 Mekanik 1 hari Rp 37,000

39 C r e w 1 hari Rp 30,000

40 Buruh lokal 1 hari Rp 26,000

41 Jaga malam 1 hari Rp 26,000

42 Pengemudi 1 hari Rp 26,000

HARGA SATUAN 2013

Page 11: Analisa Bidang Cipta Karya Tahun 2013 Revisi

DAFTAR HARGA SEWA PERALATAN

NO URAIAN UNIT INSTALASI DAN HARGA

ALAT BERAT

1 Bulldozer 110 HP Rp 236,500

2 Motor Grader 100 HP Rp 236,500

3 Wheel loader 115 HP Rp 192,500

4 Roller vibrator Self P6 - 6 T Rp 170,500

5 Water tank truck 115 HP Rp 82,500

6 Dump truck 3,5 Ton/115 HP Rp 71,500

7 Exavator / Backhoe Rp 275,000

Page 12: Analisa Bidang Cipta Karya Tahun 2013 Revisi

DAFTAR HARGA SATUAN BAHAN BANGUNAN

KET

Harga sudah termasuk

pajak-pajak dan

jasa pemborongan

Page 13: Analisa Bidang Cipta Karya Tahun 2013 Revisi
Page 14: Analisa Bidang Cipta Karya Tahun 2013 Revisi
Page 15: Analisa Bidang Cipta Karya Tahun 2013 Revisi
Page 16: Analisa Bidang Cipta Karya Tahun 2013 Revisi
Page 17: Analisa Bidang Cipta Karya Tahun 2013 Revisi
Page 18: Analisa Bidang Cipta Karya Tahun 2013 Revisi
Page 19: Analisa Bidang Cipta Karya Tahun 2013 Revisi
Page 20: Analisa Bidang Cipta Karya Tahun 2013 Revisi
Page 21: Analisa Bidang Cipta Karya Tahun 2013 Revisi

DAFTAR UPAH TENAGA KERJA

Page 22: Analisa Bidang Cipta Karya Tahun 2013 Revisi

DAFTAR HARGA SEWA PERALATAN

HARGA

/ jam

/ jam

/ jam

/ jam

/ jam

/ jam

/ jam

Page 23: Analisa Bidang Cipta Karya Tahun 2013 Revisi

DAFTAR ANALISA BIAYA SATUAN PEKERJAANPEKERJAAN KONSTRUKSI

NO SNI KODE KOEF SAT. URAIAN PEKERJAAN HARGA BAHAN/ JUMLAH UPAH

1 2 3 4 5 6 7 8

I 03-2835-2002 PEKERJAAN PERSIAPAN

PS. 1 1.0000 m' Pengukuran dan Pemasangan Bouwplank0.0120 m3 kayu 5/7x4m kayu hutan 4,375,000.00 52,500.00 0.0200 kg paku biasa 2"-5" 14,950.00 299.00 0.0070 m3 kayu papan 3/20 randu 900,000.00 6,300.00

0.1000 OH tukang kayu 54,000.00 5,400.00 0.1000 OH pekerja 48,000.00 4,800.00 0.0100 OH kepala tukang 60,000.00 600.00 0.0050 OH mandor 54,000.00 270.00

PS. 2 1.0000 m2 Membersihkan Lapangan dan Peralatan0.1000 OH pekerja 48,000.00 4,800.00 0.0500 OH mandor 54,000.00 2,700.00

PS. 3 1.0000 m3 Bongkar Beton Bertulang6.6670 OH pekerja 48,000.00 320,016.00 0.3330 OH mandor 54,000.00 17,982.00

PS. 4 1.0000 m3 membongkar dinding bata merah6.6670 OH pekerja 48,000.00 320,016.00 0.0330 OH mandor 54,000.00 1,782.00

PS. 5 1.0000 m2 mengupas plesteran 0.0500 OH pekerja 48,000.00 2,400.00 0.0025 OH mandor 54,000.00 135.00

PS. 6 1.0000 m2 membongkar usuk dan reng0.0250 OH Tukang kayu 54,000.00 1,350.00 0.0025 OH Kepala tukang kayu 60,000.00 150.00 0.0500 OH pekerja 48,000.00 2,400.00 0.0050 OH mandor 54,000.00 270.00

PS. 7 1.0000 m3 membongkar kuda-kuda6.0000 OH Tukang kayu 54,000.00 324,000.00 0.6000 OH Kepala tukang kayu 60,000.00 36,000.00 4.0000 OH pekerja 48,000.00 192,000.00 0.2000 OH mandor 54,000.00 10,800.00

PS. 8 1.0000 m2 membongkar plafond eternit0.2500 OH pekerja 48,000.00 12,000.00 0.0250 OH mandor 54,000.00 1,350.00

PS. 9 1.0000 m2 galian tanah keras/mengupas permukaan aspal1.0000 OH pekerja 48,000.00 48,000.00 0.0330 OH mandor 54,000.00 1,782.00

PS. 10 1.0000 m2 Membuat Andang Dari Bambu 1.0000 btg 18,000.00 18,000.00 0.2500 kg paku 14,950.00 3,737.50

0.1700 OH tukang kayu 54,000.00 9,180.00 0.2500 OH pekerja 48,000.00 12,000.00 0.0020 OH kepala tukang 60,000.00 120.00 0.0013 OH mandor 54,000.00 70.20

bambu Ø 6-8/600 cm

Page 24: Analisa Bidang Cipta Karya Tahun 2013 Revisi

NO SNI KODE KOEF SAT. URAIAN PEKERJAAN HARGA BAHAN/ JUMLAH UPAH

1 2 3 4 5 6 7 8

II SNI 2835 PEKERJAAN TANAH2008

T.1 1.0000 m3 Galian Tanah Biasa Sedalam 1 m0.7500 OH pekerja 42,000.00 31,500.00 0.0250 OH mandor 54,000.00 1,350.00

T.2 Galian Tanah Keras Sedalam 1 m1.0000 OH pekerja 42,000.00 42,000.00 0.0320 OH mandor 54,000.00 1,728.00

T.3 1.0000 m3 Galian tanah berbatu1.5000 OH pekerja 42,000.00 63,000.00 0.0500 OH mandor 54,000.00 2,700.00

T.4 1.0000 m3 Galian Tanah Cadas Sedalam 1 m1.5000 OH pekerja 42,000.00 63,000.00 0.0600 OH mandor 54,000.00 3,240.00

T.5 1.0000 m3 Galian Tanah Lumpur Sedalam 1 m1.2000 OH pekerja 42,000.00 50,400.00 0.0450 OH mandor 54,000.00 2,430.00

T.6 1.0000 m2 Pekerjaan striping setinggi 1 m0.0500 OH pekerja 42,000.00 2,100.00 0.0050 OH mandor 54,000.00 270.00

T.7 1.0000 m3 membuang tanah sejauh 30m'0.3300 OH pekerja 42,000.00 13,860.00 0.0100 OH mandor 54,000.00 540.00

T.8 1.0000 m3 tanah diangkut sejauh lebih dari 250 mk a/275 ( L + 75) Rp 42,000.00 / 275 (250 + 75)

T.9 1.0000 m3 tanah hurugan diangkut sejauh 30 m T.1 + T. 7

Rp 32,850.00 + Rp 14,400.00 T.10 1.2000 m3 Urugan tanah biasa dan dipadatkan

1.2000 m3 tanah biasa 29,100.00 34,920.00 0.0714 jam pekerja 42,000.00 2,998.80 0.0178 jam mandor 54,000.00 961.20 0.0178 jam whell loader 192,500.00 3,426.50 0.2289 jam dump truck 71,500.00 16,366.35 0.0061 jam motor grader 236,500.00 1,442.65 0.0100 jam vibro roller 170,500.00 1,705.00 0.0070 jam water tangker 82,500.00 577.50 1.0000 ls alat bantu 1,500.00 1,500.00

T.11 1.2000 m3 Urugan tanah padas dan dipadatkan 1.2000 m3 tanah padas 29,800.00 35,760.00 0.0714 jam pekerja 42,000.00 2,998.80 0.0178 jam mandor 54,000.00 961.20 0.0178 jam whell loader 192,500.00 3,426.50 0.2289 jam dump truck 71,500.00 16,366.35 0.0061 jam motor grader 236,500.00 1,442.65 0.0100 jam vibro roller 170,500.00 1,705.00 0.0070 jam water tangker 82,500.00 577.50 1.0000 ls alat bantu 1,500.00 1,500.00

T.12 1.0000 m3 tanah diratakan dan ditimbris0.3000 OH pekerja 42,000.00 12,600.00 0.0100 OH mandor 54,000.00 540.00

T.13 1.0000 m3 Urugan Kembali0.2500 OH pekerja 42,000.00 10,500.00 0.0083 OH mandor 54,000.00 450.00

T.14 1.0000 m3 Urugan Pasir Hurug1.2000 m3 pasir hurug 88,900.00 106,680.00 0.3000 OH pekerja 42,000.00 12,600.00 0.0100 OH mandor 54,000.00 540.00

T.15 1.0000 m3 Urugan Sirtu padat1.2000 m3 sirtu 115,000.00 138,000.00 0.2500 OH pekerja 48,000.00 12,000.00 0.0250 OH mandor 54,000.00 1,350.00

Page 25: Analisa Bidang Cipta Karya Tahun 2013 Revisi

NO SNI KODE KOEF SAT. URAIAN PEKERJAAN HARGA BAHAN/ JUMLAH UPAH

1 2 3 4 5 6 7 8T.16 1.0000 m3 urugan pasir menggunakan pasir pasang

1.2000 m3 pasir pasang 138,000.00 165,600.00 0.3000 OH pekerja 42,000.00 12,600.00 0.0100 OH mandor 54,000.00 540.00

Page 26: Analisa Bidang Cipta Karya Tahun 2013 Revisi

NO SNI KODE KOEF SAT. URAIAN PEKERJAAN HARGA BAHAN/ JUMLAH UPAH

1 2 3 4 5 6 7 8

T.17 1.0000 m2 Memasang lempengan rumput termasuk mengambilnya0.1500 OH pekerja 42,000.00 6,300.00 0.0100 OH mandor 54,000.00 540.00

T.18 1.0000 m2 Mengangkut lempengan rumput sejauh 30 m1/10 x A.6 = 1/10 x 14,400.00 / 10

T.19 1.0000 m2 Mengangkut lempengan rumput lebih dari 250 m1/10 x A.7 = 1/10 x 49,636.36 / 10

T.20 1.0000 m2 Mengambil mengangkut & memasang lempengan rumput jarak 30m T.18 + T. 19

Rp 6,840.00 + Rp 1,440.00

T.21 1.0000 m2 Mengambil mengangkut & memasang lempengan rumput lebih dari 250m T.18 + T. 20

Rp 6,840.00 + Rp 4,963.64

T.22 1.0000 m3 Timbunan tanah untuk tanggul jarak angkut 0-100 m0.0190 OH Tukang gali 42,000.00 798.00 0.0019 OH mandor 54,000.00 102.60

0.0196 jam Buldozer 236,500.00 4,635.40 0.0185 jam Excavator 275,000.00 5,087.50 0.0157 jam Roler vibrator 170,500.00 2,676.85 0.0314 jam Dump truck 71,500.00 2,245.10 1.0000 ls Alat bantu 2,000.00 2,000.00

T.23 1.0000 ttk0.1250 OH Pekerja 48,000.00 6,000.00 0.0125 OH mandor 54,000.00 675.00

1.0000 btg Bambu 18,000.00 18,000.00 0.1000 jam alat pancang 9,000.00 900.00 0.0165 jam alat bantu 250.00 4.13

T.24 1.0000 m3 Timbunan karung isi pasir0.0100 OH Pekerja 48,000.00 480.00 0.0010 OH mandor 54,000.00 54.00

1.0000 bh Karung 3,000.00 3,000.00 1.0000 m3 Pasir urug 88,900.00 88,900.00 1.0000 ls alat bantu 500.00 500.00

T.25 1.0000 m2 Pemasangan sesek bambu0.0600 OH Pekerja 48,000.00 2,880.00 0.0060 OH mandor 54,000.00 324.00

1.1000 m2 Sesek bambu 8,500.00 9,350.00

Pemasangan trucuk bambu Æ 10 cm panjang 6 m

Page 27: Analisa Bidang Cipta Karya Tahun 2013 Revisi

NO SNI KODE KOEF SAT. URAIAN PEKERJAAN HARGA BAHAN/ JUMLAH UPAH

1 2 3 4 5 6 7 8

III SNI 2836 PEKERJAAN PONDASI2008

Pd.1 1.0000 m3 Pasang anstampeng batu belah1.2000 m3 batu belah15/20 133,350.00 160,020.00 0.4320 m3 pasir hurug 88,900.00 38,404.80

0.7800 OH pekerja 48,000.00 37,440.00 0.3900 OH tukang batu 54,000.00 21,060.00 0.0390 OH kepala tukang 60,000.00 2,340.00 0.0390 OH mandor 54,000.00 2,106.00

Pd.2 1.0000 m3 Membuat bronjong dari kawat galvanis diisi dg batu15.0000 kg kawat 4 mm 23,700.00 355,500.00

0.7333 OH penganyam 54,000.00 39,600.00 0.6000 OH pekerja penganyam 48,000.00 28,800.00 0.0267 OH mandor 54,000.00 1,440.00 1.0000 m3 batu belah 133,350.00 133,350.00 1.5000 OH pekerja pengisi 48,000.00 72,000.00 0.0250 OH mandor 54,000.00 1,350.00

Pd.3 1.0000 m3 Pasang Pondasi Batu Kali 1Pc : 8 Ps dengan pasir lokal1.2000 m3 batu belah 133,350.00 160,020.00

91.0000 kg semen / PC 1,520.00 138,320.00 0.5840 m3 pasir pasang lokal 138,000.00 80,592.00

1.5000 OH pekerja 48,000.00 72,000.00 0.7500 OH tukang batu 54,000.00 40,500.00 0.0750 OH kepala tukang 60,000.00 4,500.00 0.0750 OH mandor 54,000.00 4,050.00

Pd.4 1.0000 m3 Pasang Pondasi Batu Kali 1Pc : 8 Ps dengan pasir beton 1.2000 m3 batu belah 133,350.00 160,020.00

91.0000 kg semen / PC 1,520.00 138,320.00 0.5840 m3 pasir beton 241,000.00 140,744.00

1.5000 OH pekerja 48,000.00 72,000.00 0.7500 OH tukang batu 54,000.00 40,500.00 0.0750 OH kepala tukang 60,000.00 4,500.00 0.0750 OH mandor 54,000.00 4,050.00

Pd.5 1.0000 m3 Pas Pondasi batu belah camp 1 Pc : 4 Ps dengan pasir lokal1.2000 m3 batu belah 133,350.00 160,020.00

163.0000 kg semen / PC 1,520.00 247,760.00 0.5220 m3 pasir pasang lokal 138,000.00 72,036.00

1.5000 OH pekerja 48,000.00 72,000.00 0.6000 OH tukang batu 54,000.00 32,400.00 0.0600 OH kepala tukang 60,000.00 3,600.00 0.0750 OH mandor 54,000.00 4,050.00

Pd.6 1.0000 m3 Pas Pondasi batu belah camp 1 Pc : 4 Ps dengan pasir beton1.2000 m3 batu belah 133,350.00 160,020.00

163.0000 kg semen / PC 1,520.00 247,760.00 0.5220 m3 pasir muntilan 241,000.00 125,802.00

1.5000 OH pekerja 48,000.00 72,000.00 0.6000 OH tukang batu 54,000.00 32,400.00 0.0600 OH kepala tukang 60,000.00 3,600.00 0.0750 OH mandor 54,000.00 4,050.00

Pd.7 1.0000 m3 Pasang Pondasi Batu Kali 1 Pc : 5 Ps pasir lokal1.2000 m3 batu belah 133,350.00 160,020.00

136.0000 kg semen / PC 1,520.00 206,720.00 0.5440 m3 pasir pasang 138,000.00 75,072.00

1.5000 OH pekerja 48,000.00 72,000.00 0.6000 OH tukang batu 54,000.00 32,400.00 0.0600 OH kepala tukang 60,000.00 3,600.00

Page 28: Analisa Bidang Cipta Karya Tahun 2013 Revisi

NO SNI KODE KOEF SAT. URAIAN PEKERJAAN HARGA BAHAN/ JUMLAH UPAH

1 2 3 4 5 6 7 80.0750 OH mandor 54,000.00 4,050.00

Page 29: Analisa Bidang Cipta Karya Tahun 2013 Revisi

NO SNI KODE KOEF SAT. URAIAN PEKERJAAN HARGA BAHAN/ JUMLAH UPAH

1 2 3 4 5 6 7 8

Pd.8 1.0000 m3 Pasang Pondasi Batu Kali 1 Pc : 5 Ps pasir beton1.2000 m3 batu belah 133,350.00 160,020.00

136.0000 kg semen / PC 1,520.00 206,720.00 0.5440 m3 pasir muntilan 241,000.00 131,104.00

1.5000 OH pekerja 48,000.00 72,000.00 0.6000 OH tukang batu 54,000.00 32,400.00 0.0600 OH kepala tukang 60,000.00 3,600.00 0.0750 OH mandor 54,000.00 4,050.00

Pd.9 1.0000 m3 Pasang Pondasi Rolag Trashraam Bata Merah 1 Pc : 3 Ps500.0000 m3 bata merah 600.00 300,000.00 156.0000 kg semen / PC 1,520.00 237,120.00

0.3300 m3 pasir pasang 138,000.00 45,540.00

4.5000 OH pekerja 48,000.00 216,000.00 1.5000 OH tukang batu 54,000.00 81,000.00 0.1500 OH kepala tukang 60,000.00 9,000.00 0.2250 OH mandor 54,000.00 12,150.00

Pd.10 1.0000 m' Pasang suling-suling0.3410 m' Pipa PVC 2" 26,500.00 9,036.50 0.0180 Pekerja 28,500.00 513.00 0.0020 mandor 54,000.00 108.00

Pd.11 1.0000 m3 Pekerjaan pancang1.8000 Pekerja 42,000.00 75,600.00 1.0450 mandor 54,000.00 56,430.00

pekerjaan 1 m3 pemancangan diambil 1/4 kalinya

Page 30: Analisa Bidang Cipta Karya Tahun 2013 Revisi

NO SNI KODE KOEF SAT. URAIAN PEKERJAAN HARGA BAHAN/ JUMLAH UPAH

1 2 3 4 5 6 7 8

IV SNI 6897 PEKERJAAN DINDING2008

D.1 1.0000 m2 Pasangan Batu Merah Kali Pucang Tebal 1 bata, 1Pc : 4 Ps pasir lokal150.0000 bh biji bata merah Kali Pucang 600.00 90,000.00

26.5500 kg semen / PC 1,520.00 40,356.00 0.0930 m3 pasir pasang 138,000.00 12,834.00

0.6000 OH pekerja 48,000.00 28,800.00 0.2000 OH tukang batu 54,000.00 10,800.00 0.0200 OH kepala tukang 60,000.00 1,200.00 0.0300 OH mandor 54,000.00 1,620.00

D.2 1.0000 m2 Pasangan Batu Merah Kali Pucang Tebal 1 bata, 1Pc : 4 Ps pasir beton150.0000 bh biji bata merahKali Pucang 600.00 90,000.00

26.5500 kg semen / PC 1,520.00 40,356.00 0.0930 m3 pasir muntilan 241,000.00 22,413.00

0.6000 OH pekerja 48,000.00 28,800.00 0.2000 OH tukang batu 54,000.00 10,800.00 0.0200 OH kepala tukang 60,000.00 1,200.00 0.0300 OH mandor 54,000.00 1,620.00

D.3 1.0000 m2 Pasangan Batu Merah Kali Pucang Tebal 1/2 bata, 1Pc : 3 Ps pasir lokal75.0000 bh biji bata merah Kali Pucang 600.00 45,000.00 14.3700 kg semen / PC 1,520.00 21,842.40

0.0400 m3 pasir pasang 138,000.00 5,520.00

0.3000 OH pekerja 48,000.00 14,400.00 0.1000 OH tukang batu 54,000.00 5,400.00 0.0100 OH kepala tukang 60,000.00 600.00 0.0150 OH mandor 54,000.00 810.00

D.4 1.0000 m2 Pasangan Batu Merah Kali Pucang Tebal 1/2 bata, 1Pc : 3 Ps pasir beton75.0000 bh biji bata merah Kali Pucang 600.00 45,000.00 14.3700 kg semen / PC 1,520.00 21,842.40

0.0400 m3 pasir muntilan 241,000.00 9,640.00

0.3000 OH pekerja 48,000.00 14,400.00 0.1000 OH tukang batu 54,000.00 5,400.00 0.0100 OH kepala tukang 60,000.00 600.00 0.0150 OH mandor 54,000.00 810.00

D.5 1.0000 m2 Pasangan Batu Merah Kali PucangTebal 1/2 bata, 1Pc : 8 Ps pasir lokal75.0000 bh biji bata merah Kali Pucang 600.00 45,000.00

6.5000 kg semen / PC 1,520.00 9,880.00 0.0500 m3 pasir pasang 138,000.00 6,900.00

0.3000 OH pekerja 48,000.00 14,400.00 0.1000 OH tukang batu 54,000.00 5,400.00 0.0100 OH kepala tukang 60,000.00 600.00 0.0150 OH mandor 54,000.00 810.00

D.6 1.0000 m2 Pasangan Batu Merah Kali PucangTebal 1/2 bata, 1Pc : 8 Ps pasir beton75.0000 bh biji bata merah Kali Pucang 600.00 45,000.00

6.5000 kg semen / PC 1,520.00 9,880.00 0.0500 m3 pasir muntilan 241,000.00 12,050.00

0.3000 OH pekerja 48,000.00 14,400.00 0.1000 OH tukang batu 54,000.00 5,400.00 0.0100 OH kepala tukang 60,000.00 600.00 0.0150 OH mandor 54,000.00 810.00

D.7 1.0000 m2 Pasangan Batu Merah Kudus Tebal 1 bata, 1Pc : 4 Ps pasir lokal130.0000 bh biji bata merah Kudus 810.00 105,300.00

26.5500 kg semen / PC 1,520.00 40,356.00 0.0930 m3 pasir pasang 138,000.00 12,834.00

0.6000 OH pekerja 48,000.00 28,800.00

Page 31: Analisa Bidang Cipta Karya Tahun 2013 Revisi

NO SNI KODE KOEF SAT. URAIAN PEKERJAAN HARGA BAHAN/ JUMLAH UPAH

1 2 3 4 5 6 7 80.2000 OH tukang batu 54,000.00 10,800.00 0.0200 OH kepala tukang 60,000.00 1,200.00 0.0300 OH mandor 54,000.00 1,620.00

Page 32: Analisa Bidang Cipta Karya Tahun 2013 Revisi

NO SNI KODE KOEF SAT. URAIAN PEKERJAAN HARGA BAHAN/ JUMLAH UPAH

1 2 3 4 5 6 7 8

D.8 1.0000 m2 Pasangan Batu Merah Kudus Tebal 1 bata, 1Pc : 4 Ps pasir beton130.0000 bh biji bata merah Kudus 810.00 105,300.00

26.5500 kg semen / PC 1,520.00 40,356.00 0.0930 m3 pasir muntilan 241,000.00 22,413.00

0.6000 OH pekerja 48,000.00 28,800.00 0.2000 OH tukang batu 54,000.00 10,800.00 0.0200 OH kepala tukang 60,000.00 1,200.00 0.0300 OH mandor 54,000.00 1,620.00

D.9 1.0000 m2 Pasangan Batu Merah Kudus Tebal 1/2 bata, 1Pc : 3 Ps pasir lokal65.0000 bh biji bata merah Kudus 810.00 52,650.00 14.3700 kg semen / PC 1,520.00 21,842.40

0.0400 m3 pasir pasang 241,000.00 9,640.00

0.3000 OH pekerja 48,000.00 14,400.00 0.1000 OH tukang batu 54,000.00 5,400.00 0.0100 OH kepala tukang 60,000.00 600.00 0.0150 OH mandor 54,000.00 810.00

D.10 1.0000 m2 Pasangan Batu Merah Kudus Tebal 1/2 bata, 1Pc : 3 Ps pasir beton65.0000 bh biji bata merah Kudus 810.00 52,650.00 14.3700 kg semen / PC 1,520.00 21,842.40

0.0400 m3 pasir muntilan 241,000.00 9,640.00

0.3000 OH pekerja 48,000.00 14,400.00 0.1000 OH tukang batu 54,000.00 5,400.00 0.0100 OH kepala tukang 60,000.00 600.00 0.0150 OH mandor 54,000.00 810.00

D.11 1.0000 m2 Pasangan Batu Merah Kudus Tebal 1/2 bata, 1Pc :8 Ps pasir lokal65.0000 bh biji bata merah Kudus 810.00 52,650.00

6.5000 kg semen / PC 1,520.00 9,880.00 0.0500 m3 pasir pasang 138,000.00 6,900.00

0.3000 OH pekerja 48,000.00 14,400.00 0.1000 OH tukang batu 54,000.00 5,400.00 0.0100 OH kepala tukang 60,000.00 600.00 0.0150 OH mandor 54,000.00 810.00

D.12 1.0000 m2 Pasangan Batu Merah Kudus Tebal 1/2 bata, 1Pc :8 Ps pasir beton65.0000 bh biji bata merah Kudus 810.00 52,650.00

6.5000 kg semen / PC 1,520.00 9,880.00 0.0500 m3 pasir muntilan 241,000.00 12,050.00

0.3000 OH pekerja 48,000.00 14,400.00 0.1000 OH tukang batu 54,000.00 5,400.00 0.0100 OH kepala tukang 60,000.00 600.00 0.0150 OH mandor 54,000.00 810.00

D.13 1.0000 m2 Pasangan Roster tanah merah 1Pc : 4 Ps30.0000 bh roster 3,000.00 90,000.00 14.0000 kg semen / PC 1,520.00 21,280.00

0.0320 m3 pasir pasang 138,000.00 4,416.00

0.3000 OH pekerja 48,000.00 14,400.00 0.1000 OH tukang batu 54,000.00 5,400.00 0.0100 OH kepala tukang 60,000.00 600.00 0.0150 OH mandor 54,000.00 810.00

D.14 1.0000 m2 Pasangan Batu Merah Karang sari Tebal 1 bata, 1Pc : 4 Ps pasir lokal150.0000 bh biji bata merah Karang sari 500.00 75,000.00

26.5500 kg semen / PC 1,520.00 40,356.00 0.0930 m3 pasir pasang 138,000.00 12,834.00

0.6000 OH pekerja 48,000.00 28,800.00 0.2000 OH tukang batu 54,000.00 10,800.00

Page 33: Analisa Bidang Cipta Karya Tahun 2013 Revisi

NO SNI KODE KOEF SAT. URAIAN PEKERJAAN HARGA BAHAN/ JUMLAH UPAH

1 2 3 4 5 6 7 80.0200 OH kepala tukang 60,000.00 1,200.00 0.0300 OH mandor 54,000.00 1,620.00

Page 34: Analisa Bidang Cipta Karya Tahun 2013 Revisi

NO SNI KODE KOEF SAT. URAIAN PEKERJAAN HARGA BAHAN/ JUMLAH UPAH

1 2 3 4 5 6 7 8

D.15 1.0000 m2 Pasangan Batu Merah Karang sari Tebal 1 bata, 1Pc : 4 Ps pasir beton150.0000 bh biji bata merah Karang sari 500.00 75,000.00

26.5500 kg semen / PC 1,520.00 40,356.00 0.0930 m3 pasir muntilan 241,000.00 22,413.00

0.6000 OH pekerja 48,000.00 28,800.00 0.2000 OH tukang batu 54,000.00 10,800.00 0.0200 OH kepala tukang 60,000.00 1,200.00 0.0300 OH mandor 54,000.00 1,620.00

D.16 1.0000 m2 Pasangan Batu Merah Karang sari Tebal 1/2 bata, 1Pc : 3 Ps pasir lokal75.0000 bh biji bata merah Karang sari 500.00 37,500.00 18.9500 kg semen / PC 1,520.00 28,804.00

0.0380 m3 pasir pasang 138,000.00 5,244.00

0.3000 OH pekerja 48,000.00 14,400.00 0.1000 OH tukang batu 54,000.00 5,400.00 0.0100 OH kepala tukang 60,000.00 600.00 0.0150 OH mandor 54,000.00 810.00

D.17 1.0000 m2 Pasangan Batu Merah Karang sari Tebal 1/2 bata, 1Pc : 3 Ps pasir beton75.0000 bh biji bata merah Karang sari 500.00 37,500.00 14.3700 kg semen / PC 1,520.00 21,842.40

0.0400 m3 pasir muntilan 241,000.00 9,640.00

0.3000 OH pekerja 48,000.00 14,400.00 0.1000 OH tukang batu 54,000.00 5,400.00 0.0100 OH kepala tukang 60,000.00 600.00 0.0150 OH mandor 54,000.00 810.00

D.18 1.0000 m2 Pasangan Batu Merah Karang sariTebal 1/2 bata, 1Pc : 8 Ps pasir lokal75.0000 bh biji bata merah Karang sari 500.00 37,500.00

6.5000 kg semen / PC 1,520.00 9,880.00 0.0500 m3 pasir pasang 241,000.00 12,050.00

0.3000 OH pekerja 48,000.00 14,400.00 0.1000 OH tukang batu 54,000.00 5,400.00 0.0100 OH kepala tukang 60,000.00 600.00 0.0150 OH mandor 54,000.00 810.00

D.19 1.0000 m2 Pasangan Batu Merah Karang sariTebal 1/2 bata, 1Pc : 8 Ps pasir beton75.0000 bh biji bata merah Karang sari 500.00 37,500.00

6.5000 kg semen / PC 1,520.00 9,880.00 0.0500 m3 pasir muntilan 241,000.00 12,050.00

0.3000 OH pekerja 48,000.00 14,400.00 0.1000 OH tukang batu 54,000.00 5,400.00 0.0100 OH kepala tukang 60,000.00 600.00 0.0150 OH mandor 54,000.00 810.00

Page 35: Analisa Bidang Cipta Karya Tahun 2013 Revisi

NO SNI KODE KOEF SAT. URAIAN PEKERJAAN HARGA BAHAN/ JUMLAH UPAH

1 2 3 4 5 6 7 8

V SNI 2837 PEKERJAAN PLESTERAN2008

PL.1 1.0000 m2 Plesteran 1 Pc : 3 Ps pasir lokal6.5000 kg semen/PC 1,520.00 9,880.00 0.0194 m3 pasir pasang 138,000.00 2,677.20

0.4000 OH pekerja 48,000.00 19,200.00 0.2000 OH tukang batu 54,000.00 10,800.00 0.0200 OH kepala tukang 60,000.00 1,200.00 0.0200 OH mandor 54,000.00 1,080.00

PL.2 1.0000 m2 Plesteran 1 Pc : 3 Ps pasir beton6.5000 kg semen/PC 1,520.00 9,880.00 0.0194 m3 pasir muntilan 241,000.00 4,675.40

0.4000 OH pekerja 48,000.00 19,200.00 0.2000 OH tukang batu 54,000.00 10,800.00 0.0200 OH kepala tukang 60,000.00 1,200.00 0.0200 OH mandor 54,000.00 1,080.00

PL.3 1.0000 m2 Plesteran 1 Pc : 8 Ps di aci PC pasir lokal7.1860 kg semen/PC 1,520.00 10,922.72 0.0280 m3 pasir pasang 138,000.00 3,864.00

0.3000 OH pekerja 48,000.00 14,400.00 0.1500 OH tukang batu 54,000.00 8,100.00 0.0150 OH kepala tukang 60,000.00 900.00 0.0150 OH mandor 54,000.00 810.00

PL.4 1.0000 m2 Plesteran 1 Pc : 8 Ps di aci PC pasir beton7.1860 kg semen/PC 1,520.00 10,922.72 0.0280 m3 pasir muntilan 241,000.00 6,748.00

0.3000 OH pekerja 48,000.00 14,400.00 0.1500 OH tukang batu 54,000.00 8,100.00 0.0150 OH kepala tukang 60,000.00 900.00 0.0150 OH mandor 54,000.00 810.00

PL.5 1.0000 m2 Plester Siar Adukan 1 Pc : 2 Ps6.3400 kg semen 1,520.00 9,636.80 0.0120 m3 pasir pasang 138,000.00 1,656.00

0.2000 OH pekerja 48,000.00 9,600.00 0.1500 OH tukang batu 54,000.00 8,100.00 0.0150 OH kepala tukang 60,000.00 900.00 0.0100 OH mandor 54,000.00 540.00

PL.6 1.0000 m2 Plesteran Beton 1 Pc : 2 Ps Tebal 15 mm pasir beton9.3000 kg semen 1,520.00 14,136.00 0.0180 m3 pasir muntilan 241,000.00 4,338.00

0.2000 OH pekerja 48,000.00 9,600.00 0.1500 OH tukang batu 54,000.00 8,100.00 0.0150 OH kepala tukang 60,000.00 900.00 0.0100 OH mandor 54,000.00 540.00

PL.7 1.0000 m2 Plesteran Ciprat 1 Pc : 2 Ps4.3200 kg semen 1,520.00 6,566.40 0.0060 m3 pasir pasang 138,000.00 828.00

0.2500 OH pekerja 48,000.00 12,000.00 0.1000 OH tukang batu 54,000.00 5,400.00 0.0100 OH kepala tukang 60,000.00 600.00 0.0130 OH mandor 54,000.00 702.00

Page 36: Analisa Bidang Cipta Karya Tahun 2013 Revisi

NO SNI KODE KOEF SAT. URAIAN PEKERJAAN HARGA BAHAN/ JUMLAH UPAH

1 2 3 4 5 6 7 8

Page 37: Analisa Bidang Cipta Karya Tahun 2013 Revisi

NO SNI KODE KOEF SAT. URAIAN PEKERJAAN HARGA BAHAN/ JUMLAH UPAH

1 2 3 4 5 6 7 8

VI SNI 3434 PEKERJAAN KAYU2008

KY.1 1.0000 m3 gantungan pyan15.0000 OH tukang kayu 54,000.00 810,000.00

1.5000 OH tukang kepala 60,000.00 90,000.00 5.0000 OH pekerja 48,000.00 240,000.00 0.2500 OH mandor 54,000.00 13,500.00

1.1000 m3 kayu kruing 8,570,000.00 9,427,000.00 0.1500 kg paku 14,950.00 2,242.50

KY.2 1.0000 m3 Pasang Kusen Pintu dan Jendela kayu Bengkirai1.2000 m3 kayu bengkirai 10,810,000.00 12,972,000.00 1.2500 kg paku 14,950.00 18,687.50 1.0000 kg lem kayu 16,000.00 16,000.00

6.0000 OH pekerja 48,000.00 288,000.00 20.0000 OH tukang kayu 54,000.00 1,080,000.00

2.0000 OH kepala tukang 60,000.00 120,000.00 0.3000 OH mandor 54,000.00 16,200.00

KY.3 1.0000 m3 Pasang Kusen Pintu dan Jendela kayu Jati1.1000 m3 kayu jati 15,592,500.00 17,151,750.00 1.2500 kg paku 14,950.00 18,687.50 1.0000 kg lem kayu 16,000.00 16,000.00

6.0000 OH pekerja 48,000.00 288,000.00 20.0000 OH tukang kayu 54,000.00 1,080,000.00

2.0000 OH kepala tukang 60,000.00 120,000.00 0.3000 OH mandor 54,000.00 16,200.00

KY.4 1.0000 m3 Pasang Kusen Pintu dan Jendela kayu Kanfer1.2000 m3 kayu kanfer 9,650,000.00 11,580,000.00 1.2500 kg paku 14,950.00 18,687.50 1.0000 kg lem kayu 16,000.00 16,000.00

6.0000 OH pekerja 48,000.00 288,000.00 18.0000 OH tukang kayu 54,000.00 972,000.00

2.0000 OH kepala tukang 60,000.00 120,000.00 0.3000 OH mandor 54,000.00 16,200.00

KY.5 1.0000 m2 Pas usuk reng atap genteng keramik0.1000 OH tukang kayu 54,000.00 5,400.00 0.0100 OH tukang kepala 60,000.00 600.00 0.1000 OH pekerja 48,000.00 4,800.00 0.0050 OH mandor 54,000.00 270.00

0.0140 m3 kayu bengkirai untuk usuk (5/7) 10,810,000.00 151,340.00 0.0570 m3 kayu kruing untuk reng (3/4) 8,570,000.00 488,490.00 0.2500 kg paku 14,950.00 3,737.50

KY.6 1.0000 m2 Pas usuk reng atap genteng beton0.1000 OH tukang kayu 54,000.00 5,400.00 0.0100 OH tukang kepala 60,000.00 600.00 0.1000 OH pekerja 48,000.00 4,800.00 0.0050 OH mandor 54,000.00 270.00

0.0140 m3 kayu bengkirai untuk usuk (5/7) 10,810,000.00 151,340.00 0.0570 m3 kayu kruing untuk reng (3/4) 8,570,000.00 488,490.00 0.2500 kg paku reng 14,950.00 3,737.50

KY.7 1.0000 m2 Pasang Kasau & Reng Kayu Kruing0.0120 m3 kayu kruing 8,570,000.00 102,840.00 0.1500 kg paku 14,950.00 2,242.50

0.1000 OH pekerja 48,000.00 4,800.00 0.1000 OH tukang kayu 54,000.00 5,400.00 0.0100 OH kepala tukang 60,000.00 600.00 0.0050 OH mandor 54,000.00 270.00

Page 38: Analisa Bidang Cipta Karya Tahun 2013 Revisi

NO SNI KODE KOEF SAT. URAIAN PEKERJAAN HARGA BAHAN/ JUMLAH UPAH

1 2 3 4 5 6 7 8

Page 39: Analisa Bidang Cipta Karya Tahun 2013 Revisi

NO SNI KODE KOEF SAT. URAIAN PEKERJAAN HARGA BAHAN/ JUMLAH UPAH

1 2 3 4 5 6 7 8

KY.8 1.0000 m2 Pasang Kasau & Reng Kayu Bengkirai 0.0120 m3 kayu bengkirai 10,810,000.00 129,720.00 0.1500 kg paku 14,950.00 2,242.50

0.1000 OH pekerja 48,000.00 4,800.00 0.1000 OH tukang kayu 54,000.00 5,400.00 0.0100 OH kepala tukang 60,000.00 600.00 0.0050 OH mandor 54,000.00 270.00

KY.9 1.0000 m2 Pasang Kasau lama & Reng baru Kayu Bengkirai 0.0030 m3 kayu bengkirai 10,810,000.00 32,430.00 0.1500 kg paku 14,950.00 2,242.50

0.1000 OH pekerja 48,000.00 4,800.00 0.1000 OH tukang kayu 54,000.00 5,400.00 0.0100 OH kepala tukang 60,000.00 600.00 0.0050 OH mandor 54,000.00 270.00

KY.10 1.0000 m2 Pasang Kasau & Reng Kayu Kamper0.0120 m3 kayu kamper 9,650,000.00 115,800.00 0.1500 kg paku 14,950.00 2,242.50

0.1000 OH pekerja 48,000.00 4,800.00 0.1000 OH tukang kayu 54,000.00 5,400.00 0.0100 OH kepala tukang 60,000.00 600.00 0.0050 OH mandor 54,000.00 270.00

KY.11 1.0000 m3 Pasang Konstruksi Kuda-Kuda Kayu Bengkirai1.1000 m3 kayu bengkirai 10,810,000.00 11,891,000.00

15.0000 kg baut / angkur 17,160.00 257,400.00 5.6000 kg paku 14,950.00 83,720.00

4.0000 OH pekerja 48,000.00 192,000.00 12.0000 OH tukang kayu 54,000.00 648,000.00

1.2000 OH kepala tukang 60,000.00 72,000.00 0.2000 OH mandor 54,000.00 10,800.00

KY.12 1.0000 m3 Pasang Konstruksi Kuda-Kuda Kayu Kruing1.1000 m3 kayu kruing 8,570,000.00 9,427,000.00

15.0000 kg baut / angkur 17,160.00 257,400.00 5.6000 kg paku 14,950.00 83,720.00

4.0000 OH pekerja 48,000.00 192,000.00 12.0000 OH tukang kayu 54,000.00 648,000.00

1.2000 OH kepala tukang 60,000.00 72,000.00 0.2000 OH mandor 54,000.00 10,800.00

KY.13 1.0000 m3 Pasang Konstruksi Kuda-Kuda Kayu lokal1.1000 m3 kayu lokal 3,800,000.00 4,180,000.00

15.0000 kg baut / angkur 17,160.00 257,400.00 5.6000 kg paku 14,950.00 83,720.00

4.0000 OH pekerja 48,000.00 192,000.00 12.0000 OH tukang kayu 54,000.00 648,000.00

1.2000 OH kepala tukang 60,000.00 72,000.00 0.2000 OH mandor 54,000.00 10,800.00

KY.14 1.0000 m2 Pasang Jalusi mati Kosen Kayu Kanfer0.0600 m3 kayu kanfer 9,650,000.00 579,000.00 0.1500 kg paku 14,950.00 2,242.50

0.5000 OH pekerja 48,000.00 24,000.00 2.0000 OH tukang kayu 54,000.00 108,000.00 0.2000 OH kepala tukang 60,000.00 12,000.00 0.0250 OH mandor 54,000.00 1,350.00

KY.15 1.0000 m2 Pasang Jalusi mati Kosen Kayu Bengkirai0.0600 m3 kayu bengkirai 10,810,000.00 648,600.00 0.1500 kg paku 14,950.00 2,242.50

Page 40: Analisa Bidang Cipta Karya Tahun 2013 Revisi

NO SNI KODE KOEF SAT. URAIAN PEKERJAAN HARGA BAHAN/ JUMLAH UPAH

1 2 3 4 5 6 7 8

0.5000 OH pekerja 48,000.00 24,000.00 2.0000 OH tukang kayu 54,000.00 108,000.00 0.2000 OH kepala tukang 60,000.00 12,000.00 0.0250 OH mandor 54,000.00 1,350.00

Page 41: Analisa Bidang Cipta Karya Tahun 2013 Revisi

NO SNI KODE KOEF SAT. URAIAN PEKERJAAN HARGA BAHAN/ JUMLAH UPAH

1 2 3 4 5 6 7 8

KY.16 1.0000 m2 Pasang Jalusi mati Kosen Kayu Jati0.0600 m3 kayu jati 15,592,500.00 935,550.00 0.1500 kg paku 14,950.00 2,242.50

0.5000 OH pekerja 48,000.00 24,000.00 2.0000 OH tukang kayu 54,000.00 108,000.00 0.2000 OH kepala tukang 60,000.00 12,000.00 0.0250 OH mandor 54,000.00 1,350.00

KY.17 1.0000 m2 Pasang Jalusi mati Kosen Kayu Kruing0.0600 m3 kayu kruing 8,570,000.00 514,200.00 0.1500 kg paku 14,950.00 2,242.50

0.5000 OH pekerja 48,000.00 24,000.00 2.0000 OH tukang kayu 54,000.00 108,000.00 0.2000 OH kepala tukang 60,000.00 12,000.00 0.0250 OH mandor 54,000.00 1,350.00

KY.18 1.0000 m2 Bikin daun pintu rangka kayu bengkirai tb 3,5 cm panil multiplek tb 9mm0.0140 m3 kayu bengkirai 10,810,000.00 151,340.00 0.2500 lbr mulitplek 134,000.00 33,500.00 0.0500 kg paku 14,950.00 747.50

2.5000 OH pekerja 48,000.00 120,000.00 7.5000 OH tukang kayu 54,000.00 405,000.00 0.7500 OH kepala tukang 60,000.00 45,000.00 0.1250 OH mandor 54,000.00 6,750.00

KY.19 1.0000 m2 Bikin daun pintu double teakwood rangka kayu bengkirai tb 3 cm0.0250 m3 kayu bengkirai 10,810,000.00 270,250.00 1.0000 lbr teakwood 93,750.00 93,750.00 0.0300 kg paku 14,950.00 448.50 0.5000 kg lem 16,000.00 8,000.00

0.6000 OH pekerja 48,000.00 28,800.00 2.0000 OH tukang kayu 54,000.00 108,000.00 0.2000 OH kepala tukang 60,000.00 12,000.00 0.0300 OH mandor 54,000.00 1,620.00

KY.20 1.0000 m2 Bikin daun pintu double teakwood rangka kayu bengkirai tb 3 cm dilapisi seng aluminiumUpah tenaga

0.0250 m3 kayu bengkirai 10,810,000.00 270,250.00 1.0000 lbr triplek 9 mm 134,500.00 134,500.00 1.0000 m2 seng aluminium 45,000.00 45,000.00 0.0300 kg paku 14,950.00 448.50 0.3000 kg lem 16,000.00 4,800.00

KY.21 1.0000 m2 Pasang Pintu Panyl Kayu Kanfer tb.3,5 cm0.0400 m3 kayu kanfer 9,650,000.00 386,000.00 0.5000 kg lem 16,000.00 8,000.00

1.0000 OH pekerja 48,000.00 48,000.00 2.5000 OH tukang kayu 54,000.00 135,000.00 0.2500 OH kepala tukang 60,000.00 15,000.00 0.0500 OH mandor 54,000.00 2,700.00

KY.22 1.0000 m2 Pasang Pintu Panyl Kayu Jati tb.4 cm0.0400 m3 kayu jati 15,592,500.00 623,700.00 0.5000 kg lem 16,000.00 8,000.00

1.0000 OH pekerja 48,000.00 48,000.00 2.5000 OH tukang kayu 54,000.00 135,000.00 0.2500 OH kepala tukang 60,000.00 15,000.00 0.0500 OH mandor 54,000.00 2,700.00

Page 42: Analisa Bidang Cipta Karya Tahun 2013 Revisi

NO SNI KODE KOEF SAT. URAIAN PEKERJAAN HARGA BAHAN/ JUMLAH UPAH

1 2 3 4 5 6 7 8

KY.23 1.0000 m2 Pasang Pintu & Jendela Kaca Kayu Kanfer tb.3 cm0.0240 m3 kayu kanfer 9,650,000.00 231,600.00 0.3000 kg lem 16,000.00 4,800.00

0.8000 OH pekerja 48,000.00 38,400.00 2.0000 OH tukang kayu 54,000.00 108,000.00 0.2000 OH kepala tukang 60,000.00 12,000.00 0.0400 OH mandor 54,000.00 2,160.00

KY.24 1.0000 m2 Pasang Pintu & Jendela Kaca Kayu Jati tb.3 cm0.0240 m3 kayu jati 15,592,500.00 374,220.00 0.3000 kg lem 16,000.00 4,800.00

0.8000 OH pekerja 48,000.00 38,400.00 2.0000 OH tukang kayu 54,000.00 108,000.00 0.2000 OH kepala tukang 60,000.00 12,000.00 0.0400 OH mandor 54,000.00 2,160.00

KY.25 1.0000 m2 Pas pyan papan kayu jati tb 1 cm0.0110 m3 kayu jati klas III 15,592,500.00 171,517.50 0.2000 kg paku 14,950.00 2,990.00

0.0600 OH pekerja 48,000.00 2,880.00 1.8000 OH tukang kayu 54,000.00 97,200.00 0.1800 OH kepala tukang 60,000.00 10,800.00 0.3000 OH mandor 54,000.00 16,200.00

KY.26 1.0000 m2 Pasang Plywood untuk dinding1.1000 m2 teawood 93,750.00 103,125.00 0.5000 kg paku 14,950.00 7,475.00

0.0250 OH pekerja 48,000.00 1,200.00 0.0750 OH tukang kayu 54,000.00 4,050.00 0.0075 OH kepala tukang 60,000.00 450.00 0.0013 OH mandor 54,000.00 70.20

KY.27 1.0000 m2 Pasang triplek untuk dinding1.0000 lbr triplek 3mm 50,500.00 50,500.00 0.5000 kg paku 14,950.00 7,475.00

0.0250 OH pekerja 48,000.00 1,200.00 0.0750 OH tukang kayu 54,000.00 4,050.00 0.0075 OH kepala tukang 60,000.00 450.00 0.0013 OH mandor 54,000.00 70.20

KY.28 1.0000 m' Pasang Lisplank Uk. 3/20 Kayu Jati0.0108 m3 kayu jati 15,592,500.00 168,399.00 0.1000 kg paku 14,950.00 1,495.00

0.1000 OH pekerja 48,000.00 4,800.00 0.2000 OH tukang kayu 54,000.00 10,800.00 0.0250 OH kepala tukang 60,000.00 1,500.00 0.0050 OH mandor 54,000.00 270.00

KY.29 1.0000 m' Pasang Lisplank Uk. 3/30 Kayu Jati0.0110 m3 kayu jati 15,592,500.00 171,517.50 0.0500 kg paku 14,950.00 747.50

0.1000 OH pekerja 48,000.00 4,800.00 0.2000 OH tukang kayu 54,000.00 10,800.00 0.0200 OH kepala tukang 60,000.00 1,200.00 0.0050 OH mandor 54,000.00 270.00

KY.30 1.0000 m' Pasang Lisplank Uk. 3/20 Kayu Bengkirai0.0108 m3 kayu bengkirai 10,810,000.00 116,748.00 0.1000 kg paku 14,950.00 1,495.00

Page 43: Analisa Bidang Cipta Karya Tahun 2013 Revisi

NO SNI KODE KOEF SAT. URAIAN PEKERJAAN HARGA BAHAN/ JUMLAH UPAH

1 2 3 4 5 6 7 80.0100 OH pekerja 48,000.00 480.00 0.2000 OH tukang kayu 54,000.00 10,800.00 0.0250 OH kepala tukang 60,000.00 1,500.00 0.0050 OH mandor 54,000.00 270.00

Page 44: Analisa Bidang Cipta Karya Tahun 2013 Revisi

NO SNI KODE KOEF SAT. URAIAN PEKERJAAN HARGA BAHAN/ JUMLAH UPAH

1 2 3 4 5 6 7 8

KY.31 1.0000 m' Pasang Lisplank Uk. 3/30 Kayu Bengkirai0.0110 m3 kayu bengkirai 10,810,000.00 118,910.00 0.0500 kg paku 14,950.00 747.50

0.1000 OH pekerja 48,000.00 4,800.00 0.2000 OH tukang kayu 54,000.00 10,800.00 0.0200 OH kepala tukang 60,000.00 1,200.00 0.0050 OH mandor 54,000.00 270.00

KY.32 1.0000 m' Pasang papan sirip0.0050 m3 kayu kruing 8,570,000.00 42,850.00 0.0500 kg paku 14,950.00 747.50

0.1000 OH pekerja 48,000.00 4,800.00 0.1000 OH tukang kayu 54,000.00 5,400.00 0.0100 OH kepala tukang 60,000.00 600.00 0.0500 OH mandor 54,000.00 2,700.00

Page 45: Analisa Bidang Cipta Karya Tahun 2013 Revisi

NO SNI KODE KOEF SAT. URAIAN PEKERJAAN HARGA BAHAN/ JUMLAH UPAH

1 2 3 4 5 6 7 8

VII SNI 7394 PEKERJAAN BETON2008

B.1 1.0000 m3 Membuat beton tumbuk Mutu k.100 ( 1pc : 3.5ps : 4kr)247.0000 kg Pc 1,520.00 375,440.00

0.6210 m3 pasir beton 241,000.00 149,661.00 0.7400 m3 batu pecah 1-2 204,690.00 151,470.60

215.0000 ltr air 17.00 3,655.00

1.6500 OH pekerja 48,000.00 79,200.00 0.2750 OH tukang batu 54,000.00 14,850.00 0.0280 OH kepala tukang 60,000.00 1,680.00 0.0830 OH mandor 54,000.00 4,482.00

B.2 1.0000 m3 Membuat beton Mutu k.175 ( 1 Pc : 2,5 Ps : 3 Kr )326.0000 kg Pc 1,520.00 495,520.00

0.6514 m3 pasir beton 241,000.00 156,994.29 0.7622 m3 batu pecah 1-2 204,690.00 156,019.27

215.0000 ltr air 17.00 3,655.00

1.6500 OH pekerja 48,000.00 79,200.00 0.2500 OH tukang batu 54,000.00 13,500.00 0.0250 OH kepala tukang 60,000.00 1,500.00 0.0800 OH mandor 54,000.00 4,320.00

B.3 1.0000 m3 Membuat beton Mutu k.200 ( 1 Pc : 2,3 Ps : 3 Kr )352.0000 kg Pc 1,520.00 535,040.00

0.6307 m3 pasir beton 241,000.00 152,002.14 0.7637 m3 batu pecah 1-2 204,690.00 156,322.51

215.0000 ltr air 17.00 3,655.00

1.6500 OH pekerja 48,000.00 79,200.00 0.2750 OH tukang batu 54,000.00 14,850.00 0.0280 OH kepala tukang 60,000.00 1,680.00 0.0830 OH mandor 54,000.00 4,482.00

B.4 1.0000 m3 Membuat beton Mutu k.225 ( 1pc : 2ps : 3kr)371.0000 kg Pc 1,520.00 563,920.00

0.5983 m3 pasir beton 241,000.00 144,186.86 0.7756 m3 batu pecah 1-2 204,690.00 158,748.47

215.0000 ltr air 17.00 3,655.00

1.6500 OH pekerja 48,000.00 79,200.00 0.2500 OH tukang batu 54,000.00 13,500.00 0.0250 OH kepala tukang 60,000.00 1,500.00 0.0800 OH mandor 54,000.00 4,320.00

B.5 1.0000 m3 Membuat beton Mutu k.275 ( 1pc : 1.5ps : 2.5kr)406.0000 kg Pc 1,520.00 617,120.00

0.5863 m3 pasir beton 241,000.00 141,294.86 0.7600 m3 batu pecah 1-2 204,690.00 155,564.40

215.0000 ltr air 17.00 3,655.00

1.6500 OH pekerja 48,000.00 79,200.00 0.2500 OH tukang batu 54,000.00 13,500.00 0.0300 OH kepala tukang 60,000.00 1,800.00 0.0800 OH mandor 54,000.00 4,320.00

B.6 1.0000 m3 Membuat beton Mutu k.300 ( 1pc : 1.5ps : 2kr )413.0000 kg Pc 1,520.00 627,760.00

0.5837 m3 pasir beton 241,000.00 140,675.14 0.7563 m3 batu pecah 1-2 204,690.00 154,806.29

215.0000 ltr air 17.00 3,655.00

1.6500 OH pekerja 48,000.00 79,200.00 0.2500 OH tukang batu 54,000.00 13,500.00 0.0250 OH kepala tukang 60,000.00 1,500.00 0.0800 OH mandor 54,000.00 4,320.00

Page 46: Analisa Bidang Cipta Karya Tahun 2013 Revisi

NO SNI KODE KOEF SAT. URAIAN PEKERJAAN HARGA BAHAN/ JUMLAH UPAH

1 2 3 4 5 6 7 8

Page 47: Analisa Bidang Cipta Karya Tahun 2013 Revisi

NO SNI KODE KOEF SAT. URAIAN PEKERJAAN HARGA BAHAN/ JUMLAH UPAH

1 2 3 4 5 6 7 8

B.7 1.0000 kg Pembesian dg Besi Polos atau Ulir1.0500 kg besi beton 11,690.00 12,274.50 0.0150 kg kawat bindrat 19,300.00 289.50

0.0070 OH pekerja 48,000.00 336.00 0.0070 OH tukang besi 54,000.00 378.00 0.0007 OH kepala tukang 60,000.00 42.00 0.0004 OH mandor 54,000.00 21.60

B.8 1.0000 m' Kolom praktis (11 x 11 cm)0.0020 m3 papan kayu randu 900,000.00 1,800.00 0.0100 kg paku 14,950.00 149.50 3.0000 kg besi beton 11,690.00 35,070.00 0.4500 kg kawat bindrat 19,300.00 8,685.00 4.0000 kg Pc 1,520.00 6,080.00 0.0060 m3 pasir beton 241,000.00 1,446.00 0.0090 m3 batu pecah 1-2 204,690.00 1,842.21

0.1800 OH pekerja 48,000.00 8,640.00 0.0200 OH tukang batu 54,000.00 1,080.00 0.0200 OH tukang kayu 54,000.00 1,080.00 0.0200 OH tukang besi 54,000.00 1,080.00 0.0060 OH kepala tukang 60,000.00 360.00 0.0090 OH mandor 54,000.00 486.00

B.9 1.0000 m' Sloof / ring balk beton bertulang (10 x 15 cm)0.0030 m3 papan kayu randu 900,000.00 2,700.00 0.0200 kg paku 14,950.00 299.00 3.6000 kg besi beton 11,690.00 42,084.00 0.0500 kg kawat bindrat 19,300.00 965.00 5.5000 kg Pc 1,520.00 8,360.00 0.0090 m3 pasir beton 241,000.00 2,169.00 0.0150 m3 batu pecah 1-2 204,690.00 3,070.35

0.2970 OH pekerja 48,000.00 14,256.00 0.0330 OH tukang batu 54,000.00 1,782.00 0.0330 OH tukang kayu 54,000.00 1,782.00 0.0330 OH tukang besi 54,000.00 1,782.00 0.0100 OH kepala tukang 60,000.00 600.00 0.0150 OH mandor 54,000.00 810.00

B.10 1.0000 m2 Begisting untuk plat lantai0.0400 m3 papan kayu randu 900,000.00 36,000.00 0.4000 kg paku 14,950.00 5,980.00 0.0150 m3 balok kayu 900,000.00 13,500.00 0.3500 lbr triplek 50,500.00 17,675.00 3.0000 btg bambu Ø 8-10 cm pj. 8 m 18,000.00 54,000.00

0.6600 OH pekerja 48,000.00 31,680.00 0.3300 OH tukang kayu 54,000.00 17,820.00 0.0330 OH kepala tukang 60,000.00 1,980.00 0.0330 OH mandor 54,000.00 1,782.00

B.11 1.0000 m2 Steiger dari bambu0.4000 kg paku 14,950.00 5,980.00 0.0150 m3 balok kayu 900,000.00 13,500.00 2.0000 btg bambu Ø 8-10 cm pj. 8 m 18,000.00 36,000.00

0.2500 OH pekerja 48,000.00 12,000.00 0.1700 OH tukang kayu 54,000.00 9,180.00 0.0020 OH kepala tukang 60,000.00 120.00 0.0013 OH mandor 54,000.00 70.20

B.12 1.0000 m2 Cetakan beton (bekisting) dengan kayu randu tebal 2 cm0.0220 m3 kayu randu tebal 2 cm 900,000.00 19,800.00 0.4000 kg paku 14,950.00 5,980.00

0.5000 OH tukang kayu 54,000.00 27,000.00

Page 48: Analisa Bidang Cipta Karya Tahun 2013 Revisi

NO SNI KODE KOEF SAT. URAIAN PEKERJAAN HARGA BAHAN/ JUMLAH UPAH

1 2 3 4 5 6 7 80.0500 OH tukang kepala 60,000.00 3,000.00 0.2000 OH pekerja 48,000.00 9,600.00 0.0100 OH mandor 54,000.00 540.00

Page 49: Analisa Bidang Cipta Karya Tahun 2013 Revisi

NO SNI KODE KOEF SAT. URAIAN PEKERJAAN HARGA BAHAN/ JUMLAH UPAH

1 2 3 4 5 6 7 8

VIII 03-3436-2002 PEKERJAAN PENUTUP ATAP

PA.1 1.0000 m2 Pas atap genteng Jatiwangi tak berwarna kecil0.0750 OH tukang kayu 54,000.00 4,050.00 0.0080 OH tukang kepala 60,000.00 480.00 0.1500 OH pekerja 48,000.00 7,200.00 0.0080 OH mandor 54,000.00 432.00

24.0000 bj genteng pres Jatiwangi kecil 1,900.00

PA.2 1.0000 m2 Pas atap genteng Jatiwangi tak berwarna sedang0.0600 OH tukang kayu 54,000.00 3,240.00 0.0060 OH tukang kepala 60,000.00 360.00 0.1500 OH pekerja 48,000.00 7,200.00 0.0080 OH mandor 54,000.00 432.00

18.0000 bj genteng pres Jatiwangi sedang 3,900.00

PA.3 1.0000 m2 Pas atap genteng Jatiwangi type Turbo0.0500 OH tukang kayu 54,000.00 2,700.00 0.0050 OH tukang kepala 60,000.00 300.00 0.1500 OH pekerja 48,000.00 7,200.00 0.0080 OH mandor 54,000.00 432.00

14.0000 bj genteng Jatiwangi 4,875.00

PA.4 1.0000 m2 Pas atap genteng Kebumen tak berwarna kecil0.0750 OH tukang kayu 54,000.00 4,050.00 0.0080 OH tukang kepala 60,000.00 480.00 0.1500 OH pekerja 48,000.00 7,200.00 0.0080 OH mandor 54,000.00 432.00

24.0000 bj genteng Kebumen 1,900.00

PA.5 1.0000 m2 Pas atap genteng lokal0.0750 OH tukang kayu 54,000.00 4,050.00 0.0080 OH tukang kepala 60,000.00 480.00 0.1500 OH pekerja 48,000.00 7,200.00 0.0080 OH mandor 54,000.00 432.00

25.0000 bj genteng lokal 1,100.00

PA.6 1.0000 m2 Pas atap genteng lokal kudus0.0750 OH tukang kayu 54,000.00 4,050.00 0.0080 OH tukang kepala 60,000.00 480.00 0.1500 OH pekerja 48,000.00 7,200.00 0.0080 OH mandor 54,000.00 432.00

25.0000 bj genteng kudus 950.00

PA.7 1.0000 m' Pas krepus Jatiwangi tak berwarna0.2000 OH tukang batu 54,000.00 10,800.00 0.0200 OH tukang kepala 60,000.00 1,200.00 0.4000 OH pekerja 48,000.00 19,200.00 0.0020 OH mandor 54,000.00 108.00

8.0000 kg semen / PC 1,520.00 12,160.00 0.0320 m3 pasir 138,000.00 4,416.00 3.5000 bj krepus 15,600.00 54,600.00

PA.8 1.0000 m' Pas krepus lokal0.2000 OH tukang batu 54,000.00 10,800.00 0.0200 OH tukang kepala 60,000.00 1,200.00 0.4000 OH pekerja 48,000.00 19,200.00 0.0020 OH mandor 54,000.00 108.00

3.6000 kg semen 1,520.00 5,472.00 0.0300 m3 pasir 138,000.00 4,140.00 3.5000 bj krepus Kudus/lokal 2,700.00 9,450.00

PA.9 1.0000 m2 Pasang Atap Genteng Beton11.0000 bh genteng beton standard 4,500.00 49,500.00

0.0300 kg paku 14,950.00 448.50

0.2000 OH pekerja 48,000.00 9,600.00

Page 50: Analisa Bidang Cipta Karya Tahun 2013 Revisi

NO SNI KODE KOEF SAT. URAIAN PEKERJAAN HARGA BAHAN/ JUMLAH UPAH

1 2 3 4 5 6 7 80.1000 OH tukang kayu 54,000.00 5,400.00 0.0100 OH kepala tukang 60,000.00 600.00 0.0080 OH mandor 54,000.00 432.00

Page 51: Analisa Bidang Cipta Karya Tahun 2013 Revisi

NO SNI KODE KOEF SAT. URAIAN PEKERJAAN HARGA BAHAN/ JUMLAH UPAH

1 2 3 4 5 6 7 8

PA.10 1.0000 m2 Pasang Bubungan Genteng Beton3.5000 bh bubungan genteng beton 8,000.00 28,000.00 0.0500 kg paku 14,950.00 747.50

10.8000 kg PC 1,520.00 16,416.00 0.0320 m3 pasir pasang 138,000.00 4,416.00 1.0000 kg semen warna 11,250.00 11,250.00

0.4000 OH pekerja 48,000.00 19,200.00 0.2000 OH tukang batu 54,000.00 10,800.00 0.0200 OH kepala tukang 60,000.00 1,200.00 0.0200 OH mandor 54,000.00 1,080.00

PA.11 1.0000 m' Bubungan fiber gelombang1.1000 m' bubungan fiber 62,500.00 68,750.00 4.0000 bj paku kait 1,500.00 6,000.00 0.2500 OH tukang kayu 54,000.00 13,500.00 0.0250 OH tukang kepala 60,000.00 1,500.00 0.2500 OH pekerja 48,000.00 12,000.00 0.0125 OH mandor 54,000.00 675.00

PA.12 1.0000 m' Corong talang diameter /kotak 4"0.4200 lbr seng BJLS 30 48,500.00 20,370.00 0.3750 OH tukang besi 54,000.00 20,250.00 0.0375 OH tukang kepala 60,000.00 2,250.00 0.0250 OH pekerja 48,000.00 1,200.00 0.0110 OH mandor 54,000.00 594.00

PA.13 1.0000 m2 Pasang Asbes Gelombang Besar (2,25x0,92x 5 mm)0.5500 lbr asbes gelombang 108,500.00 59,675.00 0.1200 kg paku pancing 1,500.00 180.00

0.1400 OH pekerja 48,000.00 6,720.00 0.0750 OH tukang kayu 54,000.00 4,050.00 0.0080 OH kepala tukang 60,000.00 480.00 0.0080 OH mandor 54,000.00 432.00

PA.14 1.0000 m2 Pasang asbes Gelombang kecil (180x90x 4mm)0.6500 lbr asbes gelombang 48,500.00 31,525.00 0.1200 kg paku pancing 1,500.00 180.00

0.1400 OH pekerja 48,000.00 6,720.00 0.0700 OH tukang kayu 54,000.00 3,780.00 0.0070 OH kepala tukang 60,000.00 420.00 0.0070 OH mandor 54,000.00 378.00

PA.15 1.0000 m2 Pasang Atap Seng0.7000 lbr seng gelombang BJLS 28 78,500.00 54,950.00 0.0200 kg paku sumbat 1,500.00 30.00

0.1200 OH pekerja 48,000.00 5,760.00 0.0600 OH tukang kayu 54,000.00 3,240.00 0.0060 OH tukang kepala 60,000.00 360.00 0.0060 OH mandor 54,000.00 324.00

PA.16 1.0000 m' Pasang Atap Nok Seng0.3000 lbr seng plat 43,750.00 13,125.00 0.0400 kg paku 14,950.00 598.00

0.1500 OH pekerja 48,000.00 7,200.00 0.0700 OH tukang kayu 54,000.00 3,780.00 0.0080 OH tukang kepala 60,000.00 480.00 0.0060 OH mandor 54,000.00 324.00

PA.17 1.0000 m' Bubungan asbes gelombang 1.0000 m' bubungan asbes 68,750.00 68,750.00

4.0000 bj paku kait 1,500.00 6,000.00 0.2500 OH tukang kayu 54,000.00 13,500.00 0.0250 OH tukang kepala 60,000.00 1,500.00 0.2500 OH pekerja 48,000.00 12,000.00 0.0125 OH mandor 54,000.00 675.00

Page 52: Analisa Bidang Cipta Karya Tahun 2013 Revisi

NO SNI KODE KOEF SAT. URAIAN PEKERJAAN HARGA BAHAN/ JUMLAH UPAH

1 2 3 4 5 6 7 8

Page 53: Analisa Bidang Cipta Karya Tahun 2013 Revisi

NO SNI KODE KOEF SAT. URAIAN PEKERJAAN HARGA BAHAN/ JUMLAH UPAH

1 2 3 4 5 6 7 8

IX SNI 2839 PEKERJAAN LANGIT-LANGIT2008

LL.1 1.0000 m2 pas pyan eternit kerang super0.4000 OH tukang kayu 54,000.00 21,600.00 0.0400 OH tukang kepala 60,000.00 2,400.00 0.1400 OH pekerja 48,000.00 6,720.00 0.0070 OH mandor 54,000.00 378.00

0.2000 kg paku 14,950.00 2,990.00 0.0070 m3 kayu kruing 4/6 + 5/7 8,570,000.00 59,990.00 1.0000 m2 eternit kerang super 15,000.00 15,000.00

LL.2 1.0000 m2 pas pyan eternit atrisco0.4000 OH tukang kayu 54,000.00 21,600.00 0.0400 OH tukang kepala 60,000.00 2,400.00 0.1400 OH pekerja 48,000.00 6,720.00 0.0070 OH mandor 54,000.00 378.00

0.2000 kg paku 14,950.00 2,990.00 0.0070 m3 kayu kruing 4/6 + 5/7 8,570,000.00 59,990.00 1.0000 m2 eternit atrisco 18,000.00 18,000.00

LL.3 1.0000 m2 pas pyan harplek plat tanpa cepet0.4000 OH tukang kayu 54,000.00 21,600.00 0.0400 OH tukang kepala 60,000.00 2,400.00 0.1400 OH pekerja 48,000.00 6,720.00 0.0070 OH mandor 54,000.00 378.00

0.2000 kg paku 14,950.00 2,990.00 0.0070 m3 kayu kruing 4/6 + 5/7 8,570,000.00 59,990.00 1.0000 m2 harplek plat 18,750.00 18,750.00

Page 54: Analisa Bidang Cipta Karya Tahun 2013 Revisi

NO SNI KODE KOEF SAT. URAIAN PEKERJAAN HARGA BAHAN/ JUMLAH UPAH

1 2 3 4 5 6 7 8

X PEKERJAAN SANITASIS.1 1.0000 unit Memasang Closet Duduk

1.0000 bh kloset duduk / monoblock 430,000.00 430,000.00 0.0600 kelengkapan 6% hrg kloset 430,000.00 25,800.00

3.3000 OH pekerja 48,000.00 158,400.00 1.1000 OH tukang batu 54,000.00 59,400.00 0.0010 OH kepala tukang 60,000.00 60.00 0.1600 OH mandor 54,000.00 8,640.00

S.2 1.0000 unit Memasang Closet Duduk / Mono Block INA1.0000 bh kloset duduk / monoblock 1,063,000.00 1,063,000.00 0.0600 kelengkapan 6% hrg kloset 1,063,000.00 63,780.00

3.3000 OH pekerja 48,000.00 158,400.00 1.1000 OH tukang batu 54,000.00 59,400.00 0.0010 OH kepala tukang 60,000.00 60.00 0.1600 OH mandor 54,000.00 8,640.00

S.3 1.0000 unit Memasang Closet Jongkok Porcelen1.0000 bh kloset jongkok 121,000.00 121,000.00 6.0000 kg pc 1,520.00 9,120.00 0.0100 m3 pasir pasang 138,000.00 1,380.00

1.0000 OH pekerja 48,000.00 48,000.00 1.5000 OH tukang batu 54,000.00 81,000.00 1.5000 OH kepala tukang 60,000.00 90,000.00 0.1600 OH mandor 54,000.00 8,640.00

S.4 1.0000 unit Memasang Urinoir1.0000 bh urinoir 350,000.00 350,000.00 0.3000 perlengkapan 30% 350,000.00 105,000.00 6.0000 kg pc 1,520.00 9,120.00 0.0100 m3 pasir pasang 138,000.00 1,380.00

1.0000 OH pekerja 48,000.00 48,000.00 1.0000 OH tukang batu 54,000.00 54,000.00 0.1000 OH kepala tukang 60,000.00 6,000.00 0.1000 OH mandor 54,000.00 5,400.00

S.5 1.0000 unit Memasang Wastafel1.0000 bh wastafel 269,000.00 269,000.00 0.3000 perlengkapan 30% 269,000.00 80,700.00 6.0000 kg pc 1,520.00 9,120.00 0.0100 m3 pasir pasang 138,000.00 1,380.00

1.0000 OH pekerja 48,000.00 48,000.00 1.0000 OH tukang batu 54,000.00 54,000.00 0.1000 OH kepala tukang 60,000.00 6,000.00 0.1000 OH mandor 54,000.00 5,400.00

S.6 1.0000 unit Memasang Bak Cuci Piring Stainlees1.0000 bh bak cuci piring 191,000.00 191,000.00 0.3000 set water drain + asesories 191,000.00 57,300.00

1.0000 OH pekerja 48,000.00 48,000.00 1.0000 OH tukang batu 54,000.00 54,000.00 0.1000 OH kepala tukang 60,000.00 6,000.00 0.1000 OH mandor 54,000.00 5,400.00

S.7 1.0000 buah Memasang floor drain1.0000 bh floor drain 11,000.00 11,000.00

0.0100 OH pekerja 48,000.00 480.00 0.1000 OH tukang batu 54,000.00 5,400.00 0.0100 OH kepala tukang 60,000.00 600.00 0.0050 OH mandor 54,000.00 270.00

Page 55: Analisa Bidang Cipta Karya Tahun 2013 Revisi

NO SNI KODE KOEF SAT. URAIAN PEKERJAAN HARGA BAHAN/ JUMLAH UPAH

1 2 3 4 5 6 7 8

Page 56: Analisa Bidang Cipta Karya Tahun 2013 Revisi

NO SNI KODE KOEF SAT. URAIAN PEKERJAAN HARGA BAHAN/ JUMLAH UPAH

1 2 3 4 5 6 7 8

XI SNI 7393 PEKERJAAN BESI DAN ALUMINIUM2008

BS.1 1.0000 kg Pasang Rangka Kuda-kuda Baja IWF1.1500 bh besi profil IWF 17,000.00 19,550.00

0.0600 OH pekerja 48,000.00 2,880.00 0.0600 OH tukang besi 54,000.00 3,240.00 0.0060 OH kepala tukang 60,000.00 360.00 0.0030 OH mandor 54,000.00 162.00

BS.2 1.0000 m2 Pasang Pintu Lipat Besi1.0000 m2 pintu lipat besi 441,000.00 441,000.00

0.4400 OH pekerja 48,000.00 21,120.00 0.4400 OH tukang besi 54,000.00 23,760.00 0.0440 OH kepala tukang 60,000.00 2,640.00 0.0220 OH mandor 54,000.00 1,188.00

BS.3 1.0000 m2 Pasang Roling Door tebal 5 mm1.0000 m2 roling door 346,500.00 346,500.00

1.2000 OH pekerja 48,000.00 57,600.00 1.2000 OH tukang besi 54,000.00 64,800.00 0.1200 OH kepala tukang 60,000.00 7,200.00 0.0060 OH mandor 54,000.00 324.00

BS.4 1.0000 m2 Pasang Roling Door tebal 8 mm1.0000 m2 roling door 378,000.00 378,000.00

1.2000 OH pekerja 48,000.00 57,600.00 1.2000 OH tukang besi 54,000.00 64,800.00 0.1200 OH kepala tukang 60,000.00 7,200.00 0.0060 OH mandor 54,000.00 324.00

BS.5 1.0000 m1 Pasang kusen alumunium1.1000 m1 profil alumunium 104,900.00 115,390.00 2.0000 bh skrup fizzer 1,100.00 2,200.00 0.0600 tube sealent 28,000.00 1,680.00

0.0430 OH pekerja 48,000.00 2,064.00 0.0430 OH tukang besi 54,000.00 2,322.00 0.0043 OH kepala tukang 60,000.00 258.00 0.0021 OH mandor 54,000.00 113.40

BS.6 1.0000 m2 Pasang pintu alumunium4.4000 m1 profil alumunium 104,900.00 461,560.00

14.6000 Alumunium strip 35,000.00 511,000.00

0.0850 OH pekerja 54,000.00 4,590.00 0.0850 OH tukang besi 54,000.00 4,590.00 0.0085 OH kepala tukang 60,000.00 510.00 0.0050 OH mandor 48,000.00 240.00

BS.7 1.0000 m2 Pasang Jendela Nako + Tralis1.1000 m2 jendela nako 51,000.00 56,100.00 0.0200 kg paku 14,950.00 299.00 0.0250 m2 besi strip 20,600.00 515.00

0.2000 OH pekerja 48,000.00 9,600.00 0.2000 OH tukang kayu 54,000.00 10,800.00 0.0200 OH kepala tukang 60,000.00 1,200.00 0.0010 OH mandor 54,000.00 54.00

BS.8 1.0000 m' Pasang Talang Datar / Jurai Seng BJLS 280.5000 lbr seng plat BJLS 28 43,750.00 21,875.00 0.0150 kg paku 14,950.00 224.25 0.0190 m3 kayu kruing 8,570,000.00 162,830.00

0.2000 OH pekerja 48,000.00 9,600.00 0.4000 OH tukang kayu 54,000.00 21,600.00

Page 57: Analisa Bidang Cipta Karya Tahun 2013 Revisi

NO SNI KODE KOEF SAT. URAIAN PEKERJAAN HARGA BAHAN/ JUMLAH UPAH

1 2 3 4 5 6 7 80.0250 OH kepala tukang 60,000.00 1,500.00 0.0100 OH mandor 54,000.00 540.00

Page 58: Analisa Bidang Cipta Karya Tahun 2013 Revisi

NO SNI KODE KOEF SAT. URAIAN PEKERJAAN HARGA BAHAN/ JUMLAH UPAH

1 2 3 4 5 6 7 8

BS.9 1.0000 m' Pasang Talang Miring Seng BJLS 280.5000 lbr seng plat BJLS 28 43,750.00 21,875.00 0.0150 kg paku 14,950.00 224.25 0.0190 m3 kayu kruing 8,570,000.00 162,830.00

0.2000 OH pekerja 48,000.00 9,600.00 0.4000 OH tukang kayu 54,000.00 21,600.00 0.0250 OH kepala tukang 60,000.00 1,500.00 0.0013 OH mandor 54,000.00 67.50

BS.10 1.0000 kg Baut-baut / angkur1.1000 kg baut baja 17,160.00 18,876.00 0.0900 OH tukang besi 54,000.00 4,860.00 0.0300 OH tukang kepala 60,000.00 1,800.00 0.0900 OH pekerja 48,000.00 4,320.00

BS.11 1.0000 m' Pasang Talang Talang Gantung 15 cm0.2500 lbr seng plat BJLS 28 43,750.00 10,937.50 0.0100 kg paku 14,950.00 149.50

0.6500 besi strip 20,600.00 13,390.00

0.1500 OH pekerja 48,000.00 7,200.00 0.3000 OH tukang besi 54,000.00 16,200.00 0.0300 OH kepala tukang 60,000.00 1,800.00 0.0080 OH mandor 54,000.00 432.00

m1

Page 59: Analisa Bidang Cipta Karya Tahun 2013 Revisi

NO SNI KODE KOEF SAT. URAIAN PEKERJAAN HARGA BAHAN/ JUMLAH UPAH

1 2 3 4 5 6 7 8

XII PEKERJAAN KUNCI DAN KACA

KK.1 1.0000 bh Pasang Kunci Tanam Biasa1.0000 bh kunci tanam biasa 122,500.00 122,500.00

0.0100 OH pekerja 48,000.00 480.00 0.5000 OH tukang kayu 54,000.00 27,000.00 0.0100 OH kepala tukang 60,000.00 600.00 0.0050 OH mandor 54,000.00 270.00

KK.2 1.0000 bh Pasang Kunci Tanam Kamar Mandi1.0000 bh kunci tanam kamar mandi 37,500.00 37,500.00

0.0050 OH pekerja 48,000.00 240.00 0.5000 OH tukang kayu 54,000.00 27,000.00 0.0050 OH kepala tukang 60,000.00 300.00 0.0025 OH mandor 54,000.00 135.00

KK.3 1.0000 bh Pasang Engsel Pintu1.0000 bh engsel pintu 23,500.00 23,500.00

0.0150 OH pekerja 48,000.00 720.00 0.1500 OH tukang kayu 54,000.00 8,100.00 0.0150 OH kepala tukang 60,000.00 900.00 0.0008 OH mandor 54,000.00 40.50

KK.4 1.0000 set Pasang Engsel Jendela Kupu-Kupu1.0000 set engsel jendela 12,000.00 12,000.00

0.0100 OH pekerja 48,000.00 480.00 0.1000 OH tukang kayu 54,000.00 5,400.00 0.0100 OH kepala tukang 60,000.00 600.00 0.0050 OH mandor 54,000.00 270.00

KK.5 1.0000 set Pasang Engsel Angin1.0000 set engsel angin 18,000.00 18,000.00

0.0200 OH pekerja 48,000.00 960.00 0.2000 OH tukang kayu 54,000.00 10,800.00 0.0200 OH kepala tukang 60,000.00 1,200.00 0.0100 OH mandor 54,000.00 540.00

KK.6 1.0000 bh Pasang Kait Angin1.0000 bh kait angin 5,000.00 5,000.00

0.0150 OH pekerja 48,000.00 720.00 0.1500 OH tukang kayu 54,000.00 8,100.00 0.0150 OH kepala tukang 60,000.00 900.00 0.0008 OH mandor 54,000.00 40.50

KK.7 1.0000 bh Pasang Door Closer1.0000 bh door closer 156,000.00 156,000.00

0.0500 OH pekerja 48,000.00 2,400.00 0.5000 OH tukang kayu 54,000.00 27,000.00 0.0500 OH kepala tukang 60,000.00 3,000.00 0.0025 OH mandor 54,000.00 135.00

KK.8 1.0000 bh Pasang Kunci Sloot1.0000 bh kunci sloot 5,500.00 5,500.00

0.0200 OH pekerja 48,000.00 960.00 0.2000 OH tukang kayu 54,000.00 10,800.00 0.0200 OH kepala tukang 60,000.00 1,200.00 0.0010 OH mandor 54,000.00 54.00

KK.9 1.0000 bh Pasang Rel Pintu Dorong1.0000 bh rel pintu dorong 198,000.00 198,000.00

Page 60: Analisa Bidang Cipta Karya Tahun 2013 Revisi

NO SNI KODE KOEF SAT. URAIAN PEKERJAAN HARGA BAHAN/ JUMLAH UPAH

1 2 3 4 5 6 7 8

0.0600 OH pekerja 48,000.00 2,880.00 0.6000 OH tukang kayu 54,000.00 32,400.00 0.0600 OH kepala tukang 60,000.00 3,600.00 0.0030 OH mandor 54,000.00 162.00

Page 61: Analisa Bidang Cipta Karya Tahun 2013 Revisi

NO SNI KODE KOEF SAT. URAIAN PEKERJAAN HARGA BAHAN/ JUMLAH UPAH

1 2 3 4 5 6 7 8

KK.10 1.0000 m2 Pasang Kaca tb. 3 mm1.1000 bh kaca 3 mm 60,000.00 66,000.00

0.0150 OH pekerja 48,000.00 720.00 0.1500 OH tukang kayu 54,000.00 8,100.00 0.0150 OH kepala tukang 60,000.00 900.00 0.0008 OH mandor 54,000.00 40.50

KK.11 1.0000 m2 Pasang Kaca tb. 5 mm1.1000 bh kaca 5 mm 73,000.00 80,300.00

0.0150 OH pekerja 48,000.00 720.00 0.1500 OH tukang kayu 54,000.00 8,100.00 0.0150 OH kepala tukang 60,000.00 900.00 0.0008 OH mandor 54,000.00 40.50

Page 62: Analisa Bidang Cipta Karya Tahun 2013 Revisi

NO SNI KODE KOEF SAT. URAIAN PEKERJAAN HARGA BAHAN/ JUMLAH UPAH

1 2 3 4 5 6 7 8

XIII SNI 7395 PEKERJAAN PENUTUP LANTAI DAN DINDING2008

L.1 1.0000 m2 Pasang Lantai Keramik uk. 40x40 Putih6.6300 bh keramik 40/40 8,600.00 57,018.00 9.8000 kg pc 1,520.00 14,896.00 0.0450 m3 pasir pasang 138,000.00 6,210.00 1.3000 kg semen warna 11,250.00 14,625.00

0.2500 OH pekerja 48,000.00 12,000.00 0.1250 OH tukang batu 54,000.00 6,750.00 0.0125 OH kepala tukang 60,000.00 750.00 0.0125 OH mandor 54,000.00 675.00

L.2 1.0000 m2 Pasang Lantai Keramik uk. 40x40 Warna6.6300 bh keramik 40/40 10,200.00 67,626.00 9.8000 kg pc 1,520.00 14,896.00 0.0450 m3 pasir pasang 138,000.00 6,210.00 1.3000 kg semen warna 11,250.00 14,625.00

0.2500 OH pekerja 48,000.00 12,000.00 0.1200 OH tukang batu 54,000.00 6,480.00 0.0120 OH kepala tukang 60,000.00 720.00 0.0125 OH mandor 54,000.00 675.00

L.3 1.0000 m2 Pasang Lantai Keramik uk. 40x40 Warna pola7.2600 bh keramik 40/40 10,200.00 74,052.00 9.8000 kg pc 1,520.00 14,896.00 0.0450 m3 pasir pasang 138,000.00 6,210.00 1.3000 kg semen warna 11,250.00 14,625.00

0.2500 OH pekerja 48,000.00 12,000.00 0.1200 OH tukang batu 54,000.00 6,480.00 0.0120 OH kepala tukang 60,000.00 720.00 0.0125 OH mandor 54,000.00 675.00

L.4 1.0000 m2 Pasang Lantai Keramik 20x20 26.5000 bh keramik 20/20 2,100.00 55,650.00 10.4000 kg pc 1,520.00 15,808.00

0.0450 m3 pasir pasang 138,000.00 6,210.00 1.6200 kg semen warna 11,250.00 18,225.00

0.2500 OH pekerja 48,000.00 12,000.00 0.1200 OH tukang batu 54,000.00 6,480.00 0.0120 OH kepala tukang 60,000.00 720.00 0.0125 OH mandor 54,000.00 675.00

L.5 1.0000 m2 Pasang Lantai Keramik 30x30 Warna11.8700 bh keramik warna 30/30 4,800.00 56,976.00 10.0000 kg pc 1,520.00 15,200.00

0.0450 m3 pasir pasang 138,000.00 6,210.00 1.5000 kg semen warna 11,250.00 16,875.00

0.2600 OH pekerja 48,000.00 12,480.00 0.1300 OH tukang batu 54,000.00 7,020.00 0.0130 OH kepala tukang 60,000.00 780.00 0.0130 OH mandor 54,000.00 702.00

L.6 1.0000 m2 Pasang Lantai Keramik 30x30 Putih11.8700 bh keramik putih 30/30 4,300.00 51,041.00 10.0000 kg pc 1,520.00 15,200.00

0.0450 m3 pasir pasang 138,000.00 6,210.00 1.5000 kg semen warna 11,250.00 16,875.00

0.2600 OH pekerja 48,000.00 12,480.00 0.1300 OH tukang batu 54,000.00 7,020.00 0.0130 OH kepala tukang 60,000.00 780.00 0.0130 OH mandor 54,000.00 702.00

Page 63: Analisa Bidang Cipta Karya Tahun 2013 Revisi

NO SNI KODE KOEF SAT. URAIAN PEKERJAAN HARGA BAHAN/ JUMLAH UPAH

1 2 3 4 5 6 7 8

L.7 1.0000 m2 Pasang Lantai Keramik 30x30 warna pola12.1000 bh keramik putih 30/30 4,800.00 58,080.00 10.0000 kg pc 1,520.00 15,200.00

0.0450 m3 pasir pasang 138,000.00 6,210.00 1.5000 kg semen warna 11,250.00 16,875.00

0.2600 OH pekerja 48,000.00 12,480.00 0.1300 OH tukang batu 54,000.00 7,020.00 0.0130 OH kepala tukang 60,000.00 780.00 0.0130 OH mandor 54,000.00 702.00

L.8 1.0000 m2 Pasang Dinding Keramik 20x20 26.5000 bh keramik 20/20 2,100.00 55,650.00

9.3000 kg pc 1,520.00 14,136.00 0.0180 m3 pasir pasang 138,000.00 2,484.00 1.9400 kg semen warna 11,250.00 21,825.00

0.9000 OH pekerja 48,000.00 43,200.00 0.4500 OH tukang batu 54,000.00 24,300.00 0.0450 OH kepala tukang 60,000.00 2,700.00 0.0450 OH mandor 54,000.00 2,430.00

L.9 1.0000 m2 pasang batu tempel muntilan1.1000 bh batu tempel 100,000.00 110,000.00

11.7000 kg pc 1,520.00 17,784.00 0.0350 m3 pasir pasang 138,000.00 4,830.00

0.7000 OH pekerja 28,500.00 19,950.00 0.3500 OH tukang batu 39,000.00 13,650.00 0.0350 OH kepala tukang 39,000.00 1,365.00 0.0350 OH mandor 60,000.00 2,100.00

L.10 1.0000 m2 pasang lantai tegel 30 x 300.0130 m3 kapur x 1 1/2 2,180.00 42.51 0.0260 m3 pasir x 1 1/2 138,000.00 5,382.00

11.0000 bh tegel abu-abu 30x30 1,500.00 16,500.00 2.0000 kg semen 1,520.00 3,040.00

0.1500 OH tukang batu 54,000.00 8,100.00 0.0150 OH tukang kepala 60,000.00 900.00 0.5000 OH pekerja 48,000.00 24,000.00 0.0250 OH mandor 54,000.00 1,350.00

L.11 1.0000 m2 pasang lantai tegel wafel warna 30 x 300.0130 m3 kapur x 1 1/2 437,500.00 8,531.25 0.0260 m3 pasir x 1 1/2 138,000.00 5,382.00

11.0000 bh tegel wafel warna 2,000.00 22,000.00 2.0000 kg PC warna 11,250.00 22,500.00

0.1500 OH tukang batu 54,000.00 8,100.00 0.0150 OH tukang kepala 60,000.00 900.00 0.5000 OH pekerja 48,000.00 24,000.00 0.0250 OH mandor 54,000.00 1,350.00

L.12 1.0000 m2 pasang blok pafing tebal 6 cm K.1250.0050 m3 pasir muntilan utk nat 241,000.00 1,205.00 1.0000 m2 pafing 41,900.00 41,900.00

0.1500 OH tukang batu 54,000.00 8,100.00 0.0150 OH tukang kepala 60,000.00 900.00 0.5000 OH pekerja 48,000.00 24,000.00 0.0250 OH mandor 54,000.00 1,350.00

L.13 1.0000 m2 pasang blok pafing tebal 8 cm K.1250.0050 m3 pasir muntilan utk nat 241,000.00 1,205.00 1.0000 m2 pafing 45,700.00 45,700.00

0.1500 OH tukang batu 54,000.00 8,100.00 0.0150 OH tukang kepala 60,000.00 900.00 0.5000 OH pekerja 48,000.00 24,000.00

Page 64: Analisa Bidang Cipta Karya Tahun 2013 Revisi

NO SNI KODE KOEF SAT. URAIAN PEKERJAAN HARGA BAHAN/ JUMLAH UPAH

1 2 3 4 5 6 7 80.0250 OH mandor 54,000.00 1,350.00

Page 65: Analisa Bidang Cipta Karya Tahun 2013 Revisi

NO SNI KODE KOEF SAT. URAIAN PEKERJAAN HARGA BAHAN/ JUMLAH UPAH

1 2 3 4 5 6 7 8

L.14 1.0000 m2 blok paving tebal 6 cm dengan paving mutu K 2250.0050 m3 pasir muntilan utk nat 241,000.00 1,205.00 1.0000 m2 paving K 200 72,000.00 72,000.00

0.1500 OH tukang batu 54,000.00 8,100.00 0.0150 OH tukang kepala 60,000.00 900.00 0.5000 OH pekerja 48,000.00 24,000.00 0.0250 OH mandor 54,000.00 1,350.00

L.15 1.0000 m2 blok paving tebal 8 cm dengan paving mutu K 3000.0050 m3 pasir muntilan utk nat 241,000.00 1,205.00 1.0000 m2 paving K 300 112,800.00 112,800.00

0.1500 OH tukang batu 54,000.00 8,100.00 0.0150 OH tukang kepala 60,000.00 900.00 0.5000 OH pekerja 48,000.00 24,000.00 0.0250 OH mandor 54,000.00 1,350.00

L.16 1.0000 m2 blok paving warna tebal 6 cm K.1250.0050 m3 pasir muntilan utk nat 241,000.00 1,205.00 1.0000 m2 paving warna 43,000.00 43,000.00

0.1500 OH tukang batu 54,000.00 8,100.00 0.0150 OH tukang kepala 60,000.00 900.00 0.5000 OH pekerja 48,000.00 24,000.00 0.0250 OH mandor 54,000.00 1,350.00

L.17 1.0000 m2 blok paving warna tebal 8 cm K.1250.0050 m3 pasir muntilan utk nat 241,000.00 1,205.00 1.0000 m2 paving warna 46,000.00 46,000.00

0.1500 OH tukang batu 54,000.00 8,100.00 0.0150 OH tukang kepala 60,000.00 900.00 0.5000 OH pekerja 48,000.00 24,000.00 0.0250 OH mandor 54,000.00 1,350.00

L.18 1.0000 m3 perekat portland 1 : 2580.6000 kg semen / PC 1,520.00 882,512.00

0.9500 m3 pasir 138,000.00 131,100.00

L.19 1.0000 m2 pas lantai batu lempeng 1.0000 m2 batu lempeng 52,500.00 52,500.00 0.0100 m3 perekat L.25 1,013,612.00 10,136.12 1.0000 kg semen warna 11,250.00 11,250.00

0.4500 OH tukang batu 54,000.00 24,300.00 0.0450 OH tukang kepala 60,000.00 2,700.00 0.6000 OH pekerja 48,000.00 28,800.00 0.0300 OH mandor 54,000.00 1,620.00

L.20 1.0000 m' pasang saluran U-20 cm1.0000 m' Buis beton U-20 cm 43,000.00 43,000.00 0.8000 m2 Pasang batu bata 1:3 97,692.40 78,153.92 0.5000 m2 Plesteran 1:3 44,837.20 22,418.60 0.0200 m3 Hurugan pasir 119,820.00 2,396.40

Ongkos pasang Buis U-20 4,000.00 4,000.00

L.21 1.0000 m' pasang saluran U-30 cm1.0000 m' Buis beton U-30 cm 55,000.00 55,000.00 0.8000 m2 Pasang batu bata 1:3 97,692.40 78,153.92 0.5000 m2 Plesteran 1:3 44,837.20 22,418.60 0.0200 m3 Hurugan pasir 119,820.00 2,396.40

Ongkos pasang Buis U-30 4,000.00 4,000.00

Page 66: Analisa Bidang Cipta Karya Tahun 2013 Revisi

NO SNI KODE KOEF SAT. URAIAN PEKERJAAN HARGA BAHAN/ JUMLAH UPAH

1 2 3 4 5 6 7 8

XIV PEKERJAAN PENGECATAN

C.1 1.0000 m2 mengecat kayu 3 x0.2600 kg cat 50,500.00 13,130.00 0.1740 ltr afduner 11,970.00 2,082.78 0.0600 kg plamur 14,600.00 876.00 0.0750 kg meni 28,200.00 2,115.00 0.2000 lbr amplas 12,240.00 2,448.00

0.0750 OH tukang cat 54,000.00 4,050.00 0.0075 OH tukang kepala 60,000.00 450.00 0.0500 OH pekerja 48,000.00 2,400.00 0.0025 OH mandor 54,000.00 135.00

C.2 1.0000 m2 mengecat kayu 2 x0.1730 kg cat 50,500.00 8,736.50 0.1160 ltr afduner 11,970.00 1,388.52 0.0400 kg plamur 14,600.00 584.00 0.2000 lbr amplas 12,240.00 2,448.00

0.0500 OH tukang cat 54,000.00 2,700.00 0.0050 OH tukang kepala 60,000.00 300.00 0.0330 OH pekerja 48,000.00 1,584.00 0.0016 OH mandor 54,000.00 86.40

C.3 1.0000 m2 mengecat trotoir 3 x0.2600 kg cat Beebrand dan sejenisnya 52,660.00 13,691.60 0.2500 m2 amplas 12,240.00 3,060.00 0.1740 ltr afduner 11,970.00 2,082.78

0.0750 OH tukang cat 54,000.00 4,050.00 0.0075 OH tukang kepala 60,000.00 450.00 0.0500 OH pekerja 48,000.00 2,400.00 0.0025 OH mandor 54,000.00 135.00

C.4 1.0000 m2 mengecat trotoir ulang0.1300 kg cat Beebrand dan sejenisnya 52,660.00 6,845.80 0.0870 ltr afduner 11,970.00 1,041.39

0.0375 OH tukang cat 54,000.00 2,025.00 0.0038 OH tukang kepala 60,000.00 225.00 0.0250 OH pekerja 48,000.00 1,200.00 0.0013 OH mandor 54,000.00 67.50

C.5 1.0000 m2 mengecat besi 3 x0.2600 kg cat 52,660.00 13,691.60 0.1740 ltr afduner 11,970.00 2,082.78 0.0750 kg meni 28,200.00 2,115.00 0.2000 lbr amplas 12,240.00 2,448.00

0.0750 OH tukang cat 54,000.00 4,050.00 0.0075 OH tukang kepala 60,000.00 450.00 0.0500 OH pekerja 48,000.00 2,400.00 0.0025 OH mandor 54,000.00 135.00

C.6 1.0000 m2 mengecat tembok dg Mowilex utk dalam ruangan0.2000 kg cat tembok Mowilex 56,800.00 11,360.00 0.2250 kg plamur 14,600.00 3,285.00 0.2500 lbr amplas 12,240.00 3,060.00 0.0750 OH tukang cat 54,000.00 4,050.00 0.0075 OH tukang kepala 60,000.00 450.00 0.0500 OH pekerja 48,000.00 2,400.00 0.0025 OH mandor 54,000.00 132.30

C.7 1.0000 m2 mengecat tembok dg Mowilex utk luar ruangan0.3500 kg cat tembok Mowilex 87,600.00 30,660.00 0.2250 kg plamur 14,600.00 3,285.00 0.2500 lbr amplas 12,240.00 3,060.00 0.0750 OH tukang cat 54,000.00 4,050.00 0.0075 OH tukang kepala 60,000.00 450.00 0.0500 OH pekerja 48,000.00 2,400.00

Page 67: Analisa Bidang Cipta Karya Tahun 2013 Revisi

NO SNI KODE KOEF SAT. URAIAN PEKERJAAN HARGA BAHAN/ JUMLAH UPAH

1 2 3 4 5 6 7 80.0025 OH mandor 54,000.00 135.00

C.8 1.0000 m2 mengecat tembok ulang dg Mowilex 1/2 x C.5

Page 68: Analisa Bidang Cipta Karya Tahun 2013 Revisi

NO SNI KODE KOEF SAT. URAIAN PEKERJAAN HARGA BAHAN/ JUMLAH UPAH

1 2 3 4 5 6 7 8

C.9 1.0000 m2 Mengecat tembok dg Duluk utk dalam ruangan0.2000 kg cat tembok Duluk dalam 60,000.00 12,000.00 0.2250 kg plamur 14,600.00 3,285.00 0.2500 lbr amplas 12,240.00 3,060.00 0.0750 OH tukang cat 54,000.00 4,050.00 0.0075 OH tukang kepala 60,000.00 450.00 0.0500 OH pekerja 48,000.00 2,400.00 0.0025 OH mandor 54,000.00 132.30

C.10 1.0000 m2 Mengecat tembok dg Mowilex utk luar ruangan0.3500 kg cat tembok Duluk luar 94,000.00 32,900.00 0.2250 kg plamur 14,600.00 3,285.00 0.2500 lbr amplas 12,240.00 3,060.00 0.0750 OH tukang cat 54,000.00 4,050.00 0.0075 OH tukang kepala 60,000.00 450.00 0.0500 OH pekerja 48,000.00 2,400.00 0.0025 OH mandor 54,000.00 135.00

C.11 1.0000 m2 Mengecat tembok dg Decolith0.3000 kg cat tembok Decolith 18,000.00 5,400.00 0.2250 kg plamur 14,600.00 3,285.00 0.2500 lbr amplas 12,240.00 3,060.00 0.0750 OH tukang cat 54,000.00 4,050.00 0.0075 OH tukang kepala 60,000.00 450.00 0.0500 OH pekerja 48,000.00 2,400.00 0.0025 OH mandor 54,000.00 135.00

C.12 1.0000 m2 cat tembok ulang 1/2 x C.6

C.13 1.0000 m2 mengecat pohon anyoman0.2000 kg cat tembok decholith 18,000.00 3,600.00 0.0750 OH tukang cat 54,000.00 4,050.00 0.0075 OH tukang kepala 60,000.00 450.00 0.0500 OH pekerja 48,000.00 2,400.00 0.0025 OH mandor 54,000.00 135.00

C.14 1.0000 m2 mengetir 2 kali0.4000 kg tir arang 21,900.00 8,760.00 0.2000 OH pekerja 48,000.00 9,600.00 0.0100 OH mandor 54,000.00 540.00

C.15 1.0000 m2 plitur sederhana0.0166 kg sirlak 20,000.00 332.00 0.3300 ltr spritus 9,800.00 3,234.00

0.5000 OH tukang plitur 54,000.00 27,000.00 0.0250 OH mandor 54,000.00 1,350.00

Page 69: Analisa Bidang Cipta Karya Tahun 2013 Revisi

NO SNI KODE KOEF SAT. URAIAN PEKERJAAN HARGA BAHAN/ JUMLAH UPAH

1 2 3 4 5 6 7 8

XVI PEKERJAAN PERPIPAAN AIR BERSIH

P.1 Upah 1 m' pasang pipa PVC DN. 200 mm :

0.6500 OH Tukang pipa 39,000.00 25,350.00

0.4000 OH Pekerja 28,500.00 11,400.00

0.0400 OH Mandor 54,000.00 2,160.00

0.0200 Alat bantu dan bahan trush block 25,000.00 500.00

P.2 Upah 1 m' pasang pipa PVC DN. 150 mm :0.6000 OH Tukang pipa 39,000.00 23,400.00 0.3500 OH Pekerja 28,500.00 9,975.00 0.0350 OH Mandor 54,000.00 1,890.00 0.0150 Alat bantu dan bahan trush block 25,000.00 375.00

P.3 Upah 1 m' pasang pipa PVC DN. 100 mm :0.5000 OH Tukang pipa 39,000.00 19,500.00 0.2500 OH Pekerja 28,500.00 7,125.00 0.0300 OH Mandor 54,000.00 1,620.00 0.0100 Alat bantu dan bahan trush block 25,000.00 250.00

P.4. Upah 1 m' pasang pipa PVC DN. 75 mm :0.3000 OH Tukang pipa 39,000.00 11,700.00 0.1300 OH Pekerja 28,500.00 3,705.00 0.0200 OH Mandor 54,000.00 1,080.00 0.0040 Alat bantu dan bahan trush block 25,000.00 100.00

P.5. Upah 1 m' pasang pipa PVC DN. 50 mm :0.2000 OH Tukang pipa 39,000.00 7,800.00 0.0900 OH Pekerja 28,500.00 2,565.00 0.0150 OH Mandor 54,000.00 810.00 0.0030 Alat bantu dan bahan trush block 25,000.00 75.00

P.6. Upah 1 m' pasang pipa PVC DN. 40 mm :0.1700 OH Tukang pipa 39,000.00 6,630.00 0.0700 OH Pekerja 28,500.00 1,995.00 0.0100 OH Mandor 54,000.00 540.00 0.0020 Alat bantu dan bahan trush block 25,000.00 50.00

P.7. Upah 1 m' pasang pipa PVC DN. 25 mm :0.0400 OH Tukang pipa 39,000.00 1,560.00 0.0600 OH Pekerja 28,500.00 1,710.00 0.0100 OH Mandor 54,000.00 540.00 0.0010 Alat bantu dan bahan trush block 25,000.00 25.00

Pp.1. Biaya 1 m' pemasangan pipa PVC DN.200 mm ( galian 0.3 x 1.35 ):0.4050 m3 Galian tanah T.1 32,850.00 13,304.25 0.2250 m3 Urugan tanah kembali 10,950.00 2,463.75 0.0450 m3 Buangan sisa galian T.7 14,400.00 648.00 1.0000 Upah pemasangan P.1 39,410.00 39,410.00

Pp.2. Biaya 1 m' pemasangan pipa PVC DN.150 mm ( galian 0.3 x 1.20 ) :0.3600 m3 Galian tanah T.1 32,850.00 11,826.00 0.2250 m3 Urugan tanah kembali 10,950.00 2,463.75 0.0400 m3 Buangan sisa galian T.7 14,400.00 576.00 1.0000 Upah pemasangan P.2 35,640.00 35,640.00

Pp.3. Biaya 1 m' pemasangan pipa PVC DN.100 mm ( galian 0.3 x 100 ):0.3000 m3 Galian tanah T.1 32,850.00 9,855.00 0.2000 m3 Urugan tanah kembali 10,950.00 2,190.00 0.0350 m3 Buangan sisa galian T.7 14,400.00 504.00 1.0000 Upah pemasangan P.3 28,495.00 28,495.00

Pp.4. Biaya 1 m' pemasangan pipa PVC DN.75 mm( galian 0.25 x 0.60 ) :0.1500 m3 Galian tanah T.1 32,850.00 4,927.50 0.0400 m3 Urugan tanah kembali 10,950.00 438.00 0.0300 m3 Buangan sisa galian T.7 14,400.00 432.00 1.0000 Upah pemasangan P.3 16,585.00 16,585.00

Pp.5. Biaya 1 m' pemasangan pipa PVC DN.50 mm ( galian 0.25 x 0.5 ) :0.1250 m3 Galian tanah T.1 32,850.00 4,106.25 0.0300 m3 Urugan tanah kembali 10,950.00 328.50 0.0300 m3 Buangan sisa galian T.7 14,400.00 432.00 1.0000 Upah pemasangan P.3 11,250.00 11,250.00

Pp.6. Biaya 1 m' pemasangan pipa PVC DN.40 mm ( galian 0.25 x 0.40 ) :

Page 70: Analisa Bidang Cipta Karya Tahun 2013 Revisi

NO SNI KODE KOEF SAT. URAIAN PEKERJAAN HARGA BAHAN/ JUMLAH UPAH

1 2 3 4 5 6 7 80.1000 m3 Galian tanah T.1 32,850.00 3,285.00 0.0200 m3 Urugan tanah kembali 10,950.00 219.00 0.0200 m3 Buangan sisa galian T.7 14,400.00 288.00 1.0000 Upah pemasangan P.3 9,215.00 9,215.00

Page 71: Analisa Bidang Cipta Karya Tahun 2013 Revisi

NO SNI KODE KOEF SAT. URAIAN PEKERJAAN HARGA BAHAN/ JUMLAH UPAH

1 2 3 4 5 6 7 8

Pp.7. Biaya 1 m' pemasangan pipa PVC DN.25 mm ( galian 0.25 x 0.3 ) :0.0750 m3 Galian tanah T.1 32,850.00 2,463.75 0.0100 m3 Urugan tanah kembali 10,950.00 109.50 0.1740 m3 Buangan sisa galian T.7 14,400.00 2,505.60 1.0000 Upah pemasangan P.3 3,835.00 3,835.00

Tp.1. Upah 1 m' pengetesan pipa PVC dan GI DN. 200 mm :0.0500 OH Pekerja 28,500.00 1,425.00 0.0050 OH Mandor 54,000.00 270.00 0.0020 OH Alat bantu 75,000.00 150.00 0.0314 m3 m3 air 6,000.00 188.40

Tp.2. Upah 1 m' pengetesan pipa PVC dan GI DN. 150 mm :0.0500 OH Pekerja 28,500.00 1,425.00 0.0050 OH Mandor 54,000.00 270.00 0.0020 OH Alat bantu 75,000.00 150.00 0.0202 m3 air 6,000.00 121.20

Tp.3. Upah 1 m' pengetesan pipa PVC dan GI DN. 100 mm :0.0500 OH Pekerja 28,500.00 1,425.00 0.0050 OH Mandor 54,000.00 270.00 0.0020 OH Alat bantu 75,000.00 150.00 0.0078 m3 air 6,000.00 46.80

Tp.4. Upah 1 m' pengetesan pipa PVC dan GI DN. 75 mm :0.0400 OH Pekerja 28,500.00 1,140.00 0.0040 OH Mandor 54,000.00 216.00 0.0020 OH Alat bantu 75,000.00 150.00 0.0051 m3 air 6,000.00 30.60

Tp.5. Upah 1 m' pengetesan pipa PVC dan GI DN. 50 mm :0.0400 OH Pekerja 28,500.00 1,140.00 0.0040 OH Mandor 54,000.00 216.00 0.0020 OH Alat bantu 75,000.00 150.00 0.0019 m3 air 6,000.00 11.40

Tp.6. Upah 1 m' pengetesan pipa PVC dan GI DN. 40 mm :0.0300 OH Pekerja 28,500.00 855.00 0.0030 OH Mandor 54,000.00 162.00 0.0020 OH Alat bantu 75,000.00 150.00 0.0013 m3 air 6,000.00 7.80

Tp.7. Upah 1 m' pengetesan pipa PVC dan GI DN. 25 mm :0.0300 OH Pekerja 28,500.00 855.00 0.0030 OH Mandor 54,000.00 162.00 0.0020 OH Alat bantu 75,000.00 150.00 0.0013 m3 air 6,000.00 7.80

Page 72: Analisa Bidang Cipta Karya Tahun 2013 Revisi

DAFTAR ANALISA BIAYA SATUAN PEKERJAANPEKERJAAN KONSTRUKSI

JUMLAH TOTAL

9

59,099.00

11,070.00 70,169.00

7,500.00

337,998.00

321,798.00

2,535.00

4,170.00

562,800.00

13,350.00

49,782.00

21,737.50

21,370.20 43,107.70

Page 73: Analisa Bidang Cipta Karya Tahun 2013 Revisi

JUMLAH TOTAL

9

32,850.00

43,728.00

65,700.00

66,240.00

52,830.00

2,370.00

14,400.00

49,636.36

47,250.00

63,898.00

64,738.00

13,140.00

10,950.00

119,820.00

151,350.00

Page 74: Analisa Bidang Cipta Karya Tahun 2013 Revisi

JUMLAH TOTAL

9

178,740.00

Page 75: Analisa Bidang Cipta Karya Tahun 2013 Revisi

JUMLAH TOTAL

9

6,840.00

1,440.00

4,963.64

8,280.00

11,803.64

900.60

16,644.85 17,545.45

6,675.00

18,904.13 25,579.13

534.00

92,400.00 92,934.00

3,204.00

9,350.00 12,554.00

Page 76: Analisa Bidang Cipta Karya Tahun 2013 Revisi

JUMLAH TOTAL

9

198,424.80

62,946.00 261,370.80

632,040.00

378,932.00

121,050.00 499,982.00

439,084.00

121,050.00 560,134.00

479,816.00

112,050.00 591,866.00

533,582.00

112,050.00 645,632.00

441,812.00

Page 77: Analisa Bidang Cipta Karya Tahun 2013 Revisi

JUMLAH TOTAL

9

112,050.00 553,862.00

Page 78: Analisa Bidang Cipta Karya Tahun 2013 Revisi

JUMLAH TOTAL

9

497,844.00

112,050.00 609,894.00

582,660.00

318,150.00 900,810.00

9,657.50

132,030.00 33,007.50

Page 79: Analisa Bidang Cipta Karya Tahun 2013 Revisi

JUMLAH TOTAL

9

143,190.00

42,420.00 185,610.00

152,769.00

42,420.00 195,189.00

72,362.40

21,210.00 93,572.40

76,482.40

21,210.00 97,692.40

61,780.00

21,210.00 82,990.00

66,930.00

21,210.00 88,140.00

158,490.00

Page 80: Analisa Bidang Cipta Karya Tahun 2013 Revisi

JUMLAH TOTAL

9

42,420.00 200,910.00

Page 81: Analisa Bidang Cipta Karya Tahun 2013 Revisi

JUMLAH TOTAL

9

168,069.00

42,420.00 210,489.00

84,132.40

21,210.00 105,342.40

84,132.40

21,210.00 105,342.40

69,430.00

21,210.00 90,640.00

74,580.00

21,210.00 95,790.00

115,696.00

21,210.00 136,906.00

128,190.00

Page 82: Analisa Bidang Cipta Karya Tahun 2013 Revisi

JUMLAH TOTAL

9

42,420.00 170,610.00

Page 83: Analisa Bidang Cipta Karya Tahun 2013 Revisi

JUMLAH TOTAL

9

137,769.00

42,420.00 180,189.00

71,548.00

21,210.00 92,758.00

68,982.40

21,210.00 90,192.40

59,430.00

21,210.00 80,640.00

59,430.00

21,210.00 80,640.00

Page 84: Analisa Bidang Cipta Karya Tahun 2013 Revisi

JUMLAH TOTAL

9

12,557.20

32,280.00 44,837.20

14,555.40

32,280.00 46,835.40

14,786.72

24,210.00 38,996.72

17,670.72

24,210.00 41,880.72

11,292.80

19,140.00 30,432.80

18,474.00

19,140.00 37,614.00

7,394.40

18,702.00 26,096.40

Page 85: Analisa Bidang Cipta Karya Tahun 2013 Revisi

JUMLAH TOTAL

9

Page 86: Analisa Bidang Cipta Karya Tahun 2013 Revisi

JUMLAH TOTAL

9

1,153,500.00

9,429,242.50 10,582,742.50

13,006,687.50

1,504,200.00 14,510,887.50

17,186,437.50

1,504,200.00 18,690,637.50

11,614,687.50

1,396,200.00 13,010,887.50

11,070.00

643,567.50 654,637.50

11,070.00

643,567.50 654,637.50

105,082.50

Page 87: Analisa Bidang Cipta Karya Tahun 2013 Revisi

JUMLAH TOTAL

9 11,070.00 116,152.50

Page 88: Analisa Bidang Cipta Karya Tahun 2013 Revisi

JUMLAH TOTAL

9

131,962.50

11,070.00 143,032.50

34,672.50

11,070.00 45,742.50

118,042.50

11,070.00 129,112.50

12,232,120.00

922,800.00 13,154,920.00

9,768,120.00

922,800.00 10,690,920.00

4,521,120.00

922,800.00 5,443,920.00

581,242.50

145,350.00 726,592.50

Page 89: Analisa Bidang Cipta Karya Tahun 2013 Revisi

JUMLAH TOTAL

9 650,842.50

145,350.00 796,192.50

Page 90: Analisa Bidang Cipta Karya Tahun 2013 Revisi

JUMLAH TOTAL

9

937,792.50

145,350.00 1,083,142.50

516,442.50

145,350.00 661,792.50

185,587.50

576,750.00 762,337.50

372,448.50

150,420.00 372,448.50

Bikin daun pintu double teakwood rangka kayu bengkirai tb 3 cm dilapisi seng aluminium 150,420.00

454,998.50 605,418.50

394,000.00

200,700.00 594,700.00

631,700.00

200,700.00 832,400.00

Page 91: Analisa Bidang Cipta Karya Tahun 2013 Revisi

JUMLAH TOTAL

9

236,400.00

160,560.00 396,960.00

379,020.00

160,560.00 539,580.00

174,507.50

127,080.00 174,507.50

110,600.00

5,770.20 116,370.20

57,975.00

5,770.20 63,745.20

169,894.00

17,370.00 187,264.00

172,265.00

17,070.00 189,335.00

118,243.00

Page 92: Analisa Bidang Cipta Karya Tahun 2013 Revisi

JUMLAH TOTAL

9

13,050.00 131,293.00

Page 93: Analisa Bidang Cipta Karya Tahun 2013 Revisi

JUMLAH TOTAL

9

119,657.50

17,070.00 136,727.50

43,597.50

13,500.00 57,097.50

Page 94: Analisa Bidang Cipta Karya Tahun 2013 Revisi

JUMLAH TOTAL

9

680,226.60

100,212.00

780,438.60

812,188.55

98,520.00

910,708.55

847,019.65

100,212.00

947,231.65

870,510.32

98,520.00

969,030.32

917,634.26

98,820.00 1,016,454.26

926,896.43

98,520.00 1,025,416.43

Page 95: Analisa Bidang Cipta Karya Tahun 2013 Revisi

JUMLAH TOTAL

9

Page 96: Analisa Bidang Cipta Karya Tahun 2013 Revisi

JUMLAH TOTAL

9

12,564.00

777.60

13,341.60

55,072.71

12,726.00

67,798.71

59,647.35

21,012.00

80,659.35

127,155.00

53,262.00

180,417.00

55,480.00

21,370.20 76,850.20

25,780.00

Page 97: Analisa Bidang Cipta Karya Tahun 2013 Revisi

JUMLAH TOTAL

9

40,140.00 65,920.00

Page 98: Analisa Bidang Cipta Karya Tahun 2013 Revisi

JUMLAH TOTAL

9

12,162.00 45,600.00 57,762.00

11,232.00 70,200.00 81,432.00

10,632.00 68,250.00 78,882.00

12,162.00 45,600.00 57,762.00

12,162.00 27,500.00 39,662.00

12,162.00 23,750.00 35,912.00

31,308.00

71,176.00 102,484.00

31,308.00

19,062.00 50,370.00

49,948.50

Page 99: Analisa Bidang Cipta Karya Tahun 2013 Revisi

JUMLAH TOTAL

9

16,032.00 65,980.50

Page 100: Analisa Bidang Cipta Karya Tahun 2013 Revisi

JUMLAH TOTAL

9

60,829.50

32,280.00 93,109.50

102,425.00

44,664.00

59,855.00

11,682.00 71,537.00

31,705.00

11,298.00 43,003.00

54,980.00

9,684.00 64,664.00

13,723.00

11,784.00 25,507.00

102,425.00

Page 101: Analisa Bidang Cipta Karya Tahun 2013 Revisi

JUMLAH TOTAL

9

Page 102: Analisa Bidang Cipta Karya Tahun 2013 Revisi

JUMLAH TOTAL

9

31,098.00

77,980.00 109,078.00

31,098.00

80,980.00 112,078.00

31,098.00

81,730.00 112,828.00

Page 103: Analisa Bidang Cipta Karya Tahun 2013 Revisi

JUMLAH TOTAL

9

455,800.00

226,500.00 682,300.00

1,126,780.00

226,500.00 1,353,280.00

131,500.00

227,640.00 359,140.00

465,500.00

113,400.00 578,900.00

360,200.00

113,400.00 473,600.00

248,300.00

113,400.00 361,700.00

11,000.00

6,750.00 17,750.00

Page 104: Analisa Bidang Cipta Karya Tahun 2013 Revisi

JUMLAH TOTAL

9

Page 105: Analisa Bidang Cipta Karya Tahun 2013 Revisi

JUMLAH TOTAL

9

19,550.00

6,642.00 26,192.00

441,000.00

48,708.00 489,708.00

346,500.00

129,924.00 476,424.00

378,000.00

129,924.00 507,924.00

115,390.00

4,757.40 120,147.40

461,560.00

9,930.00 471,490.00

56,914.00

21,654.00 78,568.00

184,929.25

Page 106: Analisa Bidang Cipta Karya Tahun 2013 Revisi

JUMLAH TOTAL

9

33,240.00 218,169.25

Page 107: Analisa Bidang Cipta Karya Tahun 2013 Revisi

JUMLAH TOTAL

9

184,929.25

32,767.50 217,696.75

29,856.00

24,477.00

25,632.00 50,109.00

Page 108: Analisa Bidang Cipta Karya Tahun 2013 Revisi

JUMLAH TOTAL

9

122,500.00

28,350.00 150,850.00

37,500.00

27,675.00 65,175.00

23,500.00

9,760.50 33,260.50

12,000.00

6,750.00 18,750.00

18,000.00

13,500.00 31,500.00

5,000.00

9,760.50 14,760.50

156,000.00

32,535.00 188,535.00

5,500.00

13,014.00 18,514.00

Page 109: Analisa Bidang Cipta Karya Tahun 2013 Revisi

JUMLAH TOTAL

9 198,000.00

39,042.00 237,042.00

Page 110: Analisa Bidang Cipta Karya Tahun 2013 Revisi

JUMLAH TOTAL

9

66,000.00

9,760.50 75,760.50

80,300.00

9,760.50 90,060.50

Page 111: Analisa Bidang Cipta Karya Tahun 2013 Revisi

JUMLAH TOTAL

9

92,749.00

20,175.00 112,924.00

103,357.00

19,875.00 123,232.00

109,783.00

19,875.00 129,658.00

95,893.00

19,875.00 115,768.00

95,261.00

20,982.00 116,243.00

89,326.00

20,982.00 110,308.00

Page 112: Analisa Bidang Cipta Karya Tahun 2013 Revisi

JUMLAH TOTAL

9

96,365.00

20,982.00 117,347.00

94,095.00

72,630.00 166,725.00

132,614.00

37,065.00 169,679.00

24,964.51

34,350.00 59,314.51

58,413.25

34,350.00 92,763.25

43,105.00

34,350.00 77,455.00

46,905.00

Page 113: Analisa Bidang Cipta Karya Tahun 2013 Revisi

JUMLAH TOTAL

9

34,350.00 81,255.00

Page 114: Analisa Bidang Cipta Karya Tahun 2013 Revisi

JUMLAH TOTAL

9

73,205.00

34,350.00 107,555.00

114,005.00

34,350.00 148,355.00

44,205.00

34,350.00 78,555.00

47,205.00

34,350.00 81,555.00

1,013,612.00

73,886.12

57,420.00 131,306.12

149,968.92

161,968.92

Page 115: Analisa Bidang Cipta Karya Tahun 2013 Revisi

JUMLAH TOTAL

9

20,651.78

7,035.00 27,686.78

13,157.02

4,670.40 17,827.42

18,834.38

7,035.00 25,869.38

7,887.19

3,517.50 11,404.69

20,337.38

7,035.00 27,372.38

24,737.30

Page 116: Analisa Bidang Cipta Karya Tahun 2013 Revisi

JUMLAH TOTAL

9

44,040.00

22,020.00

Page 117: Analisa Bidang Cipta Karya Tahun 2013 Revisi

JUMLAH TOTAL

9

25,377.30

46,280.00

18,780.00

9,390.00

10,635.00

18,900.00

3,566.00

28,350.00 31,916.00

Page 118: Analisa Bidang Cipta Karya Tahun 2013 Revisi

JUMLAH TOTAL

9

39,410.00

35,640.00

28,495.00

16,585.00

11,250.00

9,215.00

3,835.00

55,826.00

50,505.75

41,044.00

22,382.50

16,116.75

Page 119: Analisa Bidang Cipta Karya Tahun 2013 Revisi

JUMLAH TOTAL

9

13,007.00

Page 120: Analisa Bidang Cipta Karya Tahun 2013 Revisi

JUMLAH TOTAL

9

8,913.85

2,033.40

1,966.20

1,891.80

1,536.60

1,517.40

1,174.80

1,174.80

Page 121: Analisa Bidang Cipta Karya Tahun 2013 Revisi

DAFTAR HARGA SATUAN PEKERJAAN KONSTRUKSI

NO URAIAN PEKERJAAN SATUAN KETERANGAN

I PEKERJAAN PERSIAPAN (03-2835-2002)

1 Pengukuran dan Pemasangan Bouwplank PS. 1 Rp 70,169.00

2 Membersihkan Lapangan dan Peralatan PS. 2 Rp 7,500.00

3 Bongkar Beton Bertulang PS. 3 Rp 337,998.00

4 Membongkar dinding bata merah PS. 4 Rp 321,798.00

5 Mengupas plesteran PS. 5 Rp. Rp 2,535.00

6 Membongkar usuk dan reng PS. 6 Rp. Rp 4,170.00

7 Membongkar kuda-kuda PS. 7 Rp. Rp 562,800.00

8 Membongkar plafond eternit PS. 8 Rp. Rp 13,350.00

9 Mengupas permukaan aspal PS. 9 Rp 49,782.00

10 Membuat Andang Dari Bambu PS. 10 Rp 43,107.70

II PEKERJAAN TANAH (SNI 2835-2008)

1 Galian Tanah Biasa Sedalam 1 m T.1 Rp. Rp 32,850.00

2 Galian Tanah Keras Sedalam 1 m T.2 Rp. Rp 43,728.00

3 Galian tanah berbatu T.3 Rp. Rp 65,700.00

4 Galian Tanah Cadas Sedalam 1 m T.4 Rp. Rp 66,240.00

5 Galian Tanah Lumpur Sedalam 1 m T.5 Rp 52,830.00

6 Pekerjaan striping setinggi 1 m T.6 Rp 2,370.00

7 Tanah diangkut sejauh lebih dari 30 m T.7 Rp 14,400.00

8 Tanah diangkut sejauh lebih dari 250 m T.8 Rp 49,636.36

9 Galian tanah diangkut sejauh 30 m T.9 Rp. Rp 47,250.00

10 Urugan tanah biasa dipadatkan T.10 Rp 63,898.00

11 Urugan tanah padas dipadatkan T.11 Rp 64,738.00

12 Tanah diratakan dan ditimbris T.12 Rp. Rp 13,140.00

13 Urugan Kembali T.13 Rp 10,950.00

14 Urugan Pasir Hurug T.14 Rp 119,820.00

15 Urugan Sirtu T.15 Rp 151,350.00

16 Urugan pasir menggunakan pasir pasang T.16 Rp. Rp 178,740.00

17 Memasang lempengan rumput termasuk mengambilnya T.17 Rp 6,840.00

18 Mengangkut lempengan rumput sejauh 30 m T.18 Rp 1,440.00

19 Mengangkut lempengan rumput lebih dari 250 m T.19 Rp 4,963.64

20 Mengambil, mengangkut, memasang lemp rumput jrk 30 m T.20 Rp. Rp 8,280.00

21 Mengambil, mengangkut, memasang lemp rumput > 250 m T.21 Rp. Rp 11,803.64

22 Timbunan tanah untuk tanggul jarak angkut 0-100 m T.22 Rp 17,545.45

23 1 ttk T.23 Rp 25,579.13

24 Timbunan karung isi pasir T.24 Rp 92,934.00

25 Pemasangan sesek bambu T.25 Rp 12,554.00

III PEKERJAAN PONDASI ( SNI 2836 -2008 )

1 Pasang anstampeng batu belah Pd.1 Rp. Rp 261,370.80

2 Membuat bronjong dari kawat galvanis diisi dg batu Pd.2 Rp. Rp 632,040.00

3 Pasang Pondasi Batu Kali 1Pc : 8 Ps dengan pasir lokal Pd.3 Rp. Rp 499,982.00

4 Pasang Pondasi Batu Kali 1Pc : 8 Ps dengan pasir beton Pd.4 Rp 560,134.00

5 Pas Pondasi batu belah camp 1 Pc : 4 Ps dengan pasir lokal Pd.5 Rp. Rp 591,866.00

6 Pas Pondasi batu belah camp 1 Pc : 4 Ps dengan pasir beton Pd.6 Rp. Rp 645,632.00

7 Pasang Pondasi Batu Kali 1 Pc : 5 Ps pasir lokal Pd.7 Rp 553,862.00

8 Pasang Pondasi Batu Kali 1 Pc : 5 Ps pasir beton Pd.8 Rp 609,894.00

9 Pasang Pondasi Rolag Trashraam Bata Merah 1 Pc : 3 Ps Pd.9 Rp. Rp 900,810.00

10 Pasang suling-suling 1 m' Pd.10 Rp 9,657.50

11 Pekerjaan pancang Pd.11 Rp 33,007.50

IV PEKERJAAN DINDING ( SNI 6897-2008 )

1 Pasangan Batu Merah Kali Pucang Tebal 1 bata, 1Pc : 4 Ps pasir lokal D.1 Rp 185,610.00

2 Pasangan Batu Merah Kali Pucang Tebal 1 bata, 1Pc : 4 Ps pasir beton D.2 Rp 195,189.00

3 Pasangan Batu Merah Kali Pucang Tebal 1/2 bata, 1Pc : 3 Ps pasir lokal D.3 Rp 93,572.40

4 Pasangan Batu Merah Kali Pucang Tebal 1/2 bata, 1Pc : 3 Ps pasir beton D.4 Rp 97,692.40

KODE ANALISA

HARGA SATUAN PEKERJAAN

1 m'

1 m2

1 m3

1 m3

1 m2

1 m2

1 m3

1 m2

1 m2

1 m2

1 m3

1 m3

1 m3

1 m3

1 m3

1 m3

1 m3

1 m3

1 m3

1 m3

1 m3

1 m3

1 m3

1 m3

1 m3

1 m3

1 m2

1 m2

1 m2

1 m2

1 m2

1 m3

Pemasangan trucuk bambu Æ 10 cm panjang 6 m

1 m3

1 m2

1 m3

1 m3

1 m3

1 m3

1 m3

1 m3

1 m3

1 m3

1 m3

1 m3

1 m2

1 m2

1 m2

1 m2

Page 122: Analisa Bidang Cipta Karya Tahun 2013 Revisi

NO URAIAN PEKERJAAN SATUAN KETERANGAN KODE

ANALISA HARGA SATUAN

PEKERJAAN

5 Pasangan Batu Merah Kali PucangTebal 1/2 bata, 1Pc : 8 Ps pasir lokal D.5 Rp 82,990.00

6 Pasangan Batu Merah Kali PucangTebal 1/2 bata, 1Pc : 8 Ps pasir beton D.6 Rp 88,140.00

7 Pasangan Batu Merah Kudus Tebal 1 bata, 1Pc : 4 Ps pasir lokal D.7 Rp 200,910.00

8 Pasangan Batu Merah Kudus Tebal 1 bata, 1Pc : 4 Ps pasir beton D.8 Rp 210,489.00

9 Pasangan Batu Merah Kudus Tebal 1/2 bata, 1Pc : 3 Ps pasir lokal D.9 Rp 105,342.40

10 Pasangan Batu Merah Kudus Tebal 1/2 bata, 1Pc : 3 Ps pasir beton D.10 Rp 105,342.40

11 Pasangan Batu Merah Kudus Tebal 1/2 bata, 1Pc :8 Ps pasir lokal D.11 Rp 90,640.00

12 Pasangan Batu Merah Kudus Tebal 1/2 bata, 1Pc :8 Ps pasir beton D.12 Rp 95,790.00

13 Pasangan Roster tanah merah 1Pc : 4 Ps D.13 Rp 136,906.00

14 Pasangan Batu Merah Karang sari Tebal 1 bata, 1Pc : 4 Ps pasir lokal D.14 Rp 170,610.00

15 Pasangan Batu Merah Karang sari Tebal 1 bata, 1Pc : 4 Ps pasir beton D.15 Rp 180,189.00

16 Pasangan Batu Merah Karang sari Tebal 1/2 bata, 1Pc : 3 Ps pasir lokal D.16 Rp 92,758.00

17 Pasangan Batu Merah Karang sari Tebal 1/2 bata, 1Pc : 3 Ps pasir beton D.17 Rp 90,192.40

18 Pasangan Batu Merah Karang sariTebal 1/2 bata, 1Pc : 8 Ps pasir lokal D.18 Rp 80,640.00

19 Pasangan Batu Merah Karang sariTebal 1/2 bata, 1Pc : 8 Ps pasir beton D.19 Rp 80,640.00

V PEKERJAAN PLESTERAN ( SNI 2837-2008 )

1 Plesteran 1 Pc : 3 Ps pasir lokal PL.1 Rp. Rp 44,837.20

2 Plesteran 1 Pc : 3 Ps pasir beton PL.2 Rp 46,835.40

3 Plesteran 1 Pc : 8 Ps di aci PC pasir lokal PL.3 Rp. Rp 38,996.72

4 Plesteran 1 Pc : 8 Ps di aci PC pasir beton PL.4 Rp 41,880.72

5 Plester Siar Adukan 1 Pc : 2 Ps PL.5 Rp. Rp 30,432.80

6 Plesteran Beton 1 Pc : 2 Ps Tebal 15 mm pasir beton PL.6 Rp 37,614.00

7 Plesteran Ciprat 1 Pc : 2 Ps PL.7 Rp 26,096.40

VI PEKERJAAN KAYU ( SNI 3434-2008 )

1 Pasang gantungan pyan KY.1 Rp. Rp 10,582,742.50

2 Pasang Kusen Pintu dan Jendela kayu Bengkirai KY.2 Rp 14,510,887.50

3 Pasang Kusen Pintu dan Jendela kayu Jati KY.3 Rp 18,690,637.50

4 Pasang Kusen Pintu dan Jendela kayu Kanfer KY.4 Rp 13,010,887.50

5 Pas usuk reng rangka atap genteng keramik KY.5 Rp 654,637.50

6 Pas usuk reng rangka atap genteng beton KY.6 Rp 654,637.50

7 Pasang Kasau & Reng Kayu Kruing KY.7 Rp 116,152.50

8 Pasang Kasau & Reng Kayu Bengkirai KY.8 Rp 143,032.50

9 Pasang Kasau lama & Reng baru Kayu Bengkirai KY.9 Rp 45,742.50

10 Pasang Kasau & Reng Kayu Kamper KY.10 Rp 129,112.50

11 Pasang Konstruksi Kuda-Kuda Kayu Bengkirai KY.11 Rp 13,154,920.00

13 Pasang Konstruksi Kuda-Kuda Kayu Kruing KY.12 Rp 10,690,920.00

14 Pasang Konstruksi Kuda-Kuda Kayu lokal KY.13 Rp 5,443,920.00

17 Pasang Jalusi mati Kosen Kayu Kanfer KY.14 Rp 726,592.50

18 Pasang Jalusi mati Kosen Kayu Bengkirai KY.15 Rp 796,192.50

19 Pasang Jalusi mati Kosen Kayu Jati KY.16 Rp 1,083,142.50

20 Pasang Jalusi mati Kosen Kayu Kruing KY.17 Rp 661,792.50

23 Bikin daun pintu rangka kayu bengkirai tb 3,5 cm panil multiplek tb 9 mm KY.18 Rp. Rp 762,337.50

24 Bikin daun pintu double teakwood rangka bengkirai tb 3 cm KY.19 Rp. Rp 372,448.50

25 Bikin daun pintu double triplek rangka bengk tb 3cm lapis seng aluminium KY.20 Rp. Rp 605,418.50

26 Pasang Pintu Panyl Kayu Kanfer tb.3,5 cm KY.21 Rp 594,700.00

27 Pasang Pintu Panyl Kayu Jati tb.4 cm KY.22 Rp 832,400.00

28 Pasang Pintu & Jendela Kaca Kayu Kanfer tb.3 cm KY.23 Rp 396,960.00

29 Pasang Pintu & Jendela Kaca Kayu Jati tb.3 cm KY.24 Rp 539,580.00

30 Pasang pyan papan kayu jati tb 1 cm KY.25 Rp. Rp 174,507.50

31 Pasang Plywood untuk dinding KY.26 Rp 116,370.20

32 Pasang triplek untuk dinding KY.27 Rp 63,745.20

33 Pasang Lisplank Uk. 3/20 Kayu Jati 1m' KY.28 Rp 187,264.00

34 Pasang Lisplank Uk. 3/30 Kayu Jati 1m' KY.29 Rp 189,335.00

35 Pasang Lisplank Uk. 3/20 Kayu Bengkirai 1m' KY.30 Rp 131,293.00

36 Pasang Lisplank Uk. 3/30 Kayu Bengkirai 1m' KY.31 Rp 136,727.50

37 Pasang papan sirip 1m' KY.32 Rp 57,097.50

VII PEKERJAAN BETON ( SNI 7394-2008 )

1 Membuat beton tumbuk Mutu k.100 ( 1pc : 3.5ps : 4kr) B.1 Rp 780,438.60

2 Membuat beton Mutu k.175 ( 1 Pc : 2,5 Ps : 3 Kr ) B.2 Rp 910,708.55

Membuat beton Mutu k.200 ( 1 Pc : 2,3 Ps : 3 Kr ) B.3 Rp 947,231.65

1 m2

1 m2

1 m2

1 m2

1 m2

1 m2

1 m2

1 m2

1 m2

1 m2

1 m2

1 m2

1 m2

1 m2

1 m2

1 m2

1 m2

1 m2

1 m2

1 m2

1 m2

1 m2

1 m3

1 m3

1 m3

1 m3

1 m2

1 m2

1 m2

1 m2

1 m2

1 m2

1 m3

1 m3

1 m3

1 m2

1 m2

1 m2

1 m2

1 m2

1 m2

1 m2

1 m2

1 m2

1 m2

1 m2

1 m2

1 m2

1 m2

1 m3

1 m3

1 m3

Page 123: Analisa Bidang Cipta Karya Tahun 2013 Revisi

NO URAIAN PEKERJAAN SATUAN KETERANGAN KODE

ANALISA HARGA SATUAN

PEKERJAAN

3 Membuat beton Mutu k.225 ( 1pc : 2ps : 3kr) B.4 Rp 969,030.32

4 Membuat beton Mutu k.275 ( 1pc : 1.5ps : 2.5kr) B.5 Rp 1,016,454.26

5 Membuat beton Mutu k.300 ( 1pc : 1.5ps : 2kr ) B.6 Rp 1,025,416.43

6 Pembesian dg Besi Polos atau Ulir 1 kg B.7 Rp 13,341.60

7 Kolom praktis (11 x 11 cm) 1 m' B.8 Rp 67,798.71

8 Sloof / ring balk beton bertulang (10 x 15 cm) 1 m' B.9 Rp 80,659.35

9 Begisting untuk plat lantai B.10 Rp 180,417.00

10 Steiger dari bambu B.11 Rp 76,850.20

11 Cetakan beton (bekisting) dengan kayu randu tebal 2 cm B.12 Rp 65,920.00

VIII PEKERJAAN PENUTUP ATAP (03-3436-2002)

1 Pas atap genteng Jatiwangi tak berwarna kecil PA.1 Rp 57,762.00

2 Pas atap genteng Jatiwangi tak berwarna sedang PA.2 Rp 81,432.00

3 Pasang atap genteng pres jatiwangi type turbo PA.3 Rp. Rp 78,882.00

4 Pasang atap genteng Kebumen tak berwarna PA.4 Rp. Rp 57,762.00

5 Pasang atap genteng lokal PA.5 Rp. Rp 39,662.00

6 Pasang atap genteng Kudus PA.6 Rp. Rp 35,912.00

7 Pas krepus Jatiwangi tak berwarna 1m' PA.7 Rp 102,484.00

8 Pasang krepus lokal 1 m' PA.8 Rp. Rp 50,370.00

9 Pasang Atap Genteng Beton PA.9 Rp 65,980.50

10 Pasang Bubungan Genteng Beton 1m' PA.10 Rp 93,109.50

11 Bubungan fiber gelombang kecil 1 m' PA.11 Rp. Rp 102,425.00

12 Bikin corong talang 1 m' PA.12 Rp. Rp 44,664.00

13 Pasang Asbes Gelombang besar (2,25x0,92)m x 5 mm PA.13 Rp 71,537.00

14 Pasang Asbes Gelombang kecil (180x90)m x 4 mm PA.14 Rp 43,003.00

15 Pasang Atap Seng PA.15 Rp 64,664.00

16 Pasang Atap Nok Seng 1m' PA.16 Rp 25,507.00

17 Bubungan asbes gelombang 1 m' PA.17 Rp. Rp 102,425.00

IX PEKERJAAN LANGIT-LANGIT ( SNI 2839-2008 )

1 Pasang pyan eternit kerang super LL.1 Rp. Rp 109,078.00

2 Pasang pyan eternit atrisco LL.2 Rp. Rp 112,078.00

3 Pasang pyan harplek LL.3 Rp. Rp 112,828.00

X PEKERJAAN SANITASI

1 Memasang Closet Duduk bh S.1 Rp 682,300.00

2 Memasang Closet Duduk / Mono Block INA bh S.2 Rp 1,353,280.00

3 Memasang Closet Jongkok Porcelen bh S.3 Rp 359,140.00

4 Memasang Urinoir bh S.4 Rp 578,900.00

5 Memasang Wastafel bh S.5 Rp 473,600.00

6 Memasang Bak Cuci Piring Stainlees bh S.6 Rp 361,700.00

7 Memasang floor drain bh S.7 Rp 17,750.00

XI PEKERJAAN BESI DAN ALUMINIUM ( SNI 7393-2008 )

1 Pasang Rangka Atap Baja kg BS.1 Rp 26,192.00

2 Pasang Pintu Lipat Besi BS.2 Rp 489,708.00

3 Pasang Roling Door tebal 5 mm BS.3 Rp 476,424.00

4 Pasang Roling Door tebal 8 mm BS.4 Rp 507,924.00

5 Pasang Kusen Alumunium BS.5 Rp 120,147.40

6 Pasang Pintu Aluminium BS.6 Rp 471,490.00

7 Pasang Jendela Nako + Tralis BS.7 Rp 78,568.00

8 Pasang Talang Datar / Jurai Seng BJLS 28 BS.8 Rp 218,169.25

9 Pasang Talang Miring Seng BJLS 28 BS.9 Rp 217,696.75

10 Baut angkur 1 kg BS.10 Rp. Rp 29,856.00

11 Pasang Talang Gantung 15 cm BS.11 Rp. Rp 50,109.00

XII PEKERJAAN KUNCI DAN KACA

1 Pasang Kunci Tanam Biasa bh KK.1 Rp 150,850.00

2 Pasang Kunci Tanam Kamar Mandi bh KK.2 Rp 65,175.00

3 Pasang Engsel Pintu bh KK.3 Rp 33,260.50

4 Pasang Engsel Jendela Kupu-Kupu set KK.4 Rp 18,750.00

5 Pasang Engsel Angin set KK.5 Rp 31,500.00

6 Pasang Kait Angin bh KK.6 Rp 14,760.50

1 m3

1 m3

1 m3

1 m2

1 m2

1 m2

1 m2

1 m2

1 m2

1 m2

1 m2

1 m2

1 m2

1 m2

1 m2

1 m2

1 m2

1 m2

1 m2

1 m2

1 m2

1 m2

1 m1

1 m2

1 m2

1 m2

1 m2

1 m1

Page 124: Analisa Bidang Cipta Karya Tahun 2013 Revisi

NO URAIAN PEKERJAAN SATUAN KETERANGAN KODE

ANALISA HARGA SATUAN

PEKERJAAN

7 Pasang Door Closer bh KK.7 Rp 188,535.00

8 Pasang Kunci Sloot bh KK.8 Rp 18,514.00

9 Pasang Rel Pintu Dorong bh KK.9 Rp 237,042.00

10 Pasang Kaca tb. 3 mm KK.10 Rp 75,760.50

11 Pasang Kaca tb. 5 mm KK.11 Rp 90,060.50

XIII PEKERJAAN PENUTUP LANTAI DAN DINDING ( SNI 7395-2008 )

1 Pasang Lantai Keramik uk. 40x40 Putih L.1 Rp 112,924.00

2 Pasang Lantai Keramik uk. 40x40 Warna L.2 Rp 123,232.00

3 Pasang Lantai Keramik uk. 40x40 Warna Pola L.3 Rp 129,658.00

4 Pasang Lantai Keramik 20x20 L.4 Rp 115,768.00

5 Pasang Lantai Keramik 30x30 Warna L.5 Rp 116,243.00

6 Pasang Lantai Keramik 30x30 Putih L.6 Rp 110,308.00

7 Pasang Lantai Keramik 30x30 Warna Pola L.7 Rp 117,347.00

8 Pasang Dinding Keramik 20x20 L.8 Rp 166,725.00

9 Pasang Batu Tempel Muntilan L.9 Rp. Rp 169,679.00

10 Pasang lantai tegel abu-abu ukuran 30 x 30 L.10 Rp. Rp 59,314.51

11 Pasang lantai tegel wafel warna 30 x 30 L.11 Rp. Rp 92,763.25

12 Pasang blok paving ukuran tebal 6 cm K.125 L.12 Rp. Rp 77,455.00

13 Pasang blok paving ukuran tebal 8 cm K.125 L.13 Rp. Rp 81,255.00

14 Pasang Paving tbl 6 cm dengan paving mutu K 200 L.14 Rp. Rp 107,555.00

15 Pasang Paving tbl 8 cm dengan paving mutu K 300 L.15 Rp. Rp 148,355.00

16 Pasang Paving warna tbl. 6 cm K.125 L.16 Rp. Rp 78,555.00

17 Pasang Paving warna tbl. 8 cm K.125 L.17 Rp. Rp 81,555.00

18 Perekat portland 1 : 2 L.18 Rp 1,013,612.00

19 Pasang lantai batu lempeng L.19 Rp. Rp 131,306.12

20 Pasang saluran U-20cm 1 m' L.20 Rp. Rp 149,968.92

21 Pasang saluran U-30cm 1 m' L.21 Rp. Rp 161,968.92

XIV PEKERJAAN PENGECATAN

1 Mengecat kayu 3 kali C.1 Rp. Rp 27,686.78

2 Mengecat kayu 2 kali C.2 Rp 17,827.42

3 Mengecat trotoir 3 kali C.3 Rp. Rp 25,869.38

4 Mengecat trotoir ulang C.4 Rp 11,404.69

5 Mengecat besi 3 kali C.5 Rp. Rp 27,372.38

6 Mengecat tembok dg mowilex utk dalam ruangan C.6 Rp. Rp 24,737.30

7 Mengecat tembok dg mowilex utk luar ruangan C.7 Rp. Rp 44,040.00

8 Mengecat tembok ulang dg mowilex C.8 Rp 22,020.00

9 Mengecat tembok dg Duluk utk dalam ruangan C.9 Rp 25,377.30

10 Mengecat tembok dg Mowilex utk luar ruangan C.10 Rp 46,280.00

11 Mengecat tembok dg Decolit C.11 Rp. Rp 18,780.00

12 Mengecat tembok dg decolit (ulang) C.12 Rp. Rp 9,390.00

13 Mengecat pohon anyoman C.13 Rp. Rp 10,635.00

14 Mengetir 2 kali C.14 Rp. Rp 18,900.00

15 Plitur sederhana C.15 Rp. Rp 31,916.00

XV PEKERJAAN PERPIPAAN AIR BERSIH

1 Upah pasang pipa PVC DN. 200 mm 1 m' P.1 Rp 39,410.00

2 Upah pasang pipa PVC DN. 150 mm 1 m' P.2 Rp 35,640.00

3 Upah pasang pipa PVC DN. 100 mm 1 m' P.3 Rp 28,495.00

4 Upah pasang pipa PVC DN. 75 mm 1 m' P.4 Rp 16,585.00

5 Upah pasang pipa PVC DN. 50 mm 1 m' P.5 Rp 11,250.00

6 Upah pasang pipa PVC DN. 40 mm 1 m' P.6 Rp 9,215.00

7 Upah pasang pipa PVC DN. 25 mm 1 m' P.7 Rp 3,835.00

8 Biaya pemasangan pipa PVC DN.200 mm 1 m' Pp.1 Rp 55,826.00

9 Biaya pemasangan pipa PVC DN.150 mm 1 m' Pp.2 Rp 50,505.75

10 Biaya pemasangan pipa PVC DN.100 mm 1 m' Pp.3 Rp 41,044.00

11 Biaya pemasangan pipa PVC DN.75 mm 1 m' Pp.4 Rp 22,382.50

12 Biaya pemasangan pipa PVC DN.50 mm 1 m' Pp.5 Rp 16,116.75

13 Biaya pemasangan pipa PVC DN.40 mm 1 m' Pp.6 Rp 13,007.00

14 Biaya pemasangan pipa PVC DN.25 mm 1 m' Pp.7 Rp 8,913.85

15 Upah pengetesan pipa PVC dan GI DN. 200 mm 1 m' Tp.1 Rp 2,033.40

16 Upah pengetesan pipa PVC dan GI DN. 150 mm 1 m' Tp.2 Rp 1,966.20

1 m2

1 m2

1 m2

1 m2

1 m2

1 m2

1 m2

1 m2

1 m2

1 m2

1 m2

1 m2

1 m2

1 m2

1 m2

1 m2

1 m2

1 m2

1 m2

1 m3

1 m2

1 m2

1 m2

1 m2

1 m2

1 m2

1 m2

1 m2

1 m2

1 m2

1 m2

1 m2

1 m2

1 m2

1 m2

1 m2

Page 125: Analisa Bidang Cipta Karya Tahun 2013 Revisi

NO URAIAN PEKERJAAN SATUAN KETERANGAN KODE

ANALISA HARGA SATUAN

PEKERJAAN

17 Upah pengetesan pipa PVC dan GI DN. 100 mm 1 m' Tp.3 Rp 1,891.80

18 Upah pengetesan pipa PVC dan GI DN. 75 mm 1 m' Tp.4 Rp 1,536.60

19 Upah pengetesan pipa PVC dan GI DN. 50 mm 1 m' Tp.5 Rp 1,517.40

20 Upah pengetesan pipa PVC dan GI DN. 40 mm 1 m' Tp.6 Rp 1,174.80

21 Upah pengetesan pipa PVC dan GI DN. 25 mm 1 m' Tp.7 Rp 1,174.80

22 Mobilisasi/demobilisasi driling rig dan peralatan pemboran Ls An.1 #REF!

23 Pemboran pilot hole diameter 6 ", 0 -- 50 m 1 m' An.2 ### #REF!

24 Pemboran pilot hole diameter 6 ", 50 -- 100 m 1 m' An.3 #REF!

25 Pemboran pilot hole diameter 6 ", 100 -- 150 m 1 m' An.4 #REF!

26 Pekerjaan raming 0 -- 65 m 1 m' An.5 #REF!

27 Pekerjaan raming 65 -- 130 m 1 m' An.6 #REF!

28 Pekerjaan electric logging 1 m' An.7 #REF!

29 Pekerjaan pengadaan dan pemasangan pipa jambang diameter 8" 1 m' An.8 #REF!

30 Pekerjaan pengadaan dan pemasangan pipa buta diameter 6" 1 m' An.9 #REF!

31 Pekerjaan pengadaan dan pemasangan pipa saringan stainless steel 6" 1 m' An.10 #REF!

32 Pekerjaan pengadaan dan pemasangan pipa jambang diameter 6" (GIP) 1 m' An.8' #REF!

33 Pekerjaan pengadaan dan pemasangan pipa buta diameter 4" (GIP) 1 m' An.9' #REF!

34 Pekerjaan pengadaan dan pemasangan pipa saringan stainless steel 4" 1 m' An.10' #REF!

Page 126: Analisa Bidang Cipta Karya Tahun 2013 Revisi

kloset inajongkok 2 Rp 121,000.00 Rp 242,000.00 floordrain 2 Rp 11,000.00 Rp 22,000.00 pipa 4'' 15 Rp 54,000.00 Rp 810,000.00 pvc 3/4'' 10 Rp 6,500.00 Rp 65,000.00 pintu alumunium 2 Rp 461,560.00 Rp 923,120.00 kusen 2 Rp 115,390.00 Rp 230,780.00 kabel 10plat dak t. 10 cm Rp 2,292,900.00 ember+cidok 2BAK air 500 l 1Pompa air 1/2 pk 1cat tembok