3
MPE 225 MPE 225 MPE 225 MPE 225 MPE 225 MPE 225 MPE 225 MPE 225 MPE 225 MPE 225 MPE 225 MPE 225 MPE 225 MPE 225 MPE 225 MPE 225 MPE 225 MPE 225 MPE 225 MPE 225 ROOF SLOPE 4 12 V.I.F. PZ1 20 MODULES PZ2 PZ2 PZ2 PZ3 PZ3 RAIL MOUNT ( TYP.) SHEET NO: PUBLISHED: SHEET NAME: DRAWN: CHECKED: SB AG ENLARGED VIEWING & HYPERLINKS: PRINT VERSION OF THIS PLAN PROVIDES MINIMUM INFORMATION NEEDED BY USERS. ELECTRONIC VERSION (EV) PROVIDES MAGNIFIED VIEWING UP TO 6400%. EV ALSO PROVIDES HYPERLINK ACCESS TO OEM MANUALS AND ABUNDANT OTHER SUPPLEMENTARY INFORMATION.EV MAY BE ACCESSED AT: WWW.GEZELMANPE.COM/PV/0127P_Ellenberger_Brentwood_CA.dwg REVISIONS: ALLEN GEZELMAN 16502 HANNA RD. LUTZ, FLORIDA 33549 PH. 813 650 7246 FX. 866 397 9050 Allen@Gezelman PE.COM www.GezelmanPE.com PE. # 34825 I CERTIFY THAT THIS DESIGN & SPECIFICATIONS MEET THE REQUIREMENTS OF THE CURRENT CALIFORNIA BUILDING CODE. 01 SCALE: N.T.S. BUILDING - STREET VIEW 02 SCALE: N.T.S. PARCEL - CONTRA COUNTY ASSESSOR I CERTIFY THAT THE FRAMING OF THIS STRUCTURE WILL SAFELY ACCOMMODATE CALCULATED WIND UPLIFT AND LATERAL FORCES AND EQUIPMENT DEAD LOADS. THIS IS ATTESTED TO BY MY SIGNATURE AND SEAL ON THIS DRAWING AT THE UPPER RIGHT. CERTAIN DETAILS OF THIS PROJECT MAY DIFFER, REFER TO OEM LITERATURE WHICH SHALL PREVAIL. 03 SCALE: N.T.S. BUILDING SATELLITE IMAGE INSTALLATION LOCATION ON OPPOSITE SITE 05 http://www.civicsolar.com/sites/default/files/library/collateral/tilehook-install.pdf MOUNTING SYSTEM - UNIRAC TILE HOOK CONTRACTER RESPONSIBLE TO VERIFY THE FIT OF THIS ARRAY PRIOR TO INSTALLATION: THE SOLAR MODULE ARRAY SHOWN HERE IS BASED ON THE FIELD DATA PROVIDED BY THE CONTRACTOR. CONTRACTOR SHALL CONTACT THE ENGINEER IF THE ARRAY MAY NOT FIT AS PROJECTED AND CHANGES TO LAYOUT OR LOCATION MAY BE REQUIRED. COPY RIGHT & INTELLECTUAL PROPERTY NOTICE THIS PLAN SET IS COPY RIGHT PROTECTED AND CONTAINS INTELLECTUAL PROPERTY WHICH BELONGS TO ALLEN GEZELMAN PE. ACCESS IS GIVEN TO THE INFORMATION HEREON SOLELY FOR THE PURPOSE OF COMPLETION OF THE PROJECT FOR WHICH IT IS INTENDED. NO OTHER USE MAY BE MADE OF THE INFORMATION, DRAWINGS, OR IDEAS HEREON WITHOUT THE EXPRESS , WRITTEN, PERMISSION OF ALLEN GEZELMAN PE ALL AFFIDAVITS, DESIGNS, OPINIONS, CALCULATIONS & OTHER ENGINEERING SERVICES PROVIDED BY ALLEN GEZELMAN PE AND HIS ASSOCIATES ON ANY AND ALL PROJECTS ARE SUBJECT TO THE PROVISIONS OF EJCDC C-700 (ENGINEERS JOINT CONSTRUCTION DOCUMENT COMMITTEE - STANDARD GENERAL CONDITIONS OF THE CONSTRUCTION CONTRACT) CURRENT AT THE TIME. THOSE OBJECTING TO SAID EJCDC C-700 OR PROVISIONS THEREOF ARE DIRECTED NOT TO USE THE AFFIDAVIT, DESIGN, OPINION, CALCULATION OR OTHER ENGINEERING SERVICE OFFERED BY BRUCE TOZIER PE AND HIS ASSOCIATES ON THE PROJECT. EJCDC C-700 MAY BE VIEWED AT: HTTP://GEZELMANPE.COM/REFERENCE/AG/C-700.PDF THIS PLAN IS VOID WITHOUT MY SIGNATURE & RAISED SEAL. THIS PLAN MAY NOT BE PLACED ON FILE FOR PULLING MULTIPLE PERMITS.EACH PERMIT PULLED REQUIRES ITS OWN RAISED SEAL COPY OF THIS PLAN. DESIGNED PER: ASCE 7-05 APPLICABLE CODE: 2010 CALIFORNIA BUILDING CODE OWNER: 1820 Castellina Dr, Brentwood, CA 94513 Fred Ellenberger INSTALLATION OF A SOLAR ELECTRIC SYSTEM 1820 Castellina Dr, Brentwood, CA 94513 ROOF MOUNT EXPOSURE: DESIGN WIND SPEED: BLDG. IP. CATEGORY: 85MPH B II CONTRACTOR: FLAGG BUILDING IMPROVEMENTS, 1420 CENTRAL AVE. BRENTWOOD, CA 94513 LIC 621004 THIS PLAN IS ONLINE FOR REVIEW @ WWW.GEZELMANPE.COM/PV/0127P_ELLENBERGER_BRENTWOOD_CA.PDF 06 SCALE: 1"= 1'-0" ROOF ATTACHMENT DETAIL 07 SCALE: N.T.S. PV MODULE - MPE 225 PS09 MAX. UPLIFT: PZ1_9.8 PSF; PZ2_17.0 PSF; PZ3_25.1 PSF . ASCE 7 PRESSURE ZONE DIAGRAM MAY BE VIEWED AT: http://www.unirac.com/pdf/ii227.pdf CONTRA COSTA COUNTY PROPERTY INFO: APN # 019550012 SITE DESCRIPTION: T8368 L12 04 http://prosolar.com/prosolar-new/pages/rooftrac-main2.htm PRO SOLAR - SUPPORT RAIL PRO SOLAR SUPPORT RAIL - 2.5" UNIRAC UNIVERSIAL MOUNT HOLD DOWN HARDWARE UNIRAC UNIVERSIAL MOUNT INSTALLATION 07 SCALE: 3/16" = 1'-0" ROOF PLAN W/ 20 FLUSH MOUNT PV MODULES INSTALLATION LOCATION UNIRAC UNIVERSIAL MOUNT HOLD - SAMPLE PHOTO STRUCTURAL PERMIT ONLY REMOVE SOLAR POOLHEATER UTILITY (VIF.) DICONNECT (VIF.) CALIFORNIA PHOTO-VOLTAIC (PV) SYSTEM INSTALLATION NOTES: THE DETAILS SPECIFIED ON THIS “PAPER” PLAN ARE CONSIDERED TO BE THE MINIMUM NEEDED BY USERS (AHJ -AUTHORITY HAVING JURISDICTION AND INSTALLERS). USERS ARE ENCOURAGED TO ACCESS EV (ELECTRONIC VERSION) OF THIS PLAN: WWW.GEZELMANPE.COM/PV/0129P_DURAN_DISCOVERYBAY_CA.PDF. ACTIVE HYPERLINKS EMBEDDED IN EV PROVIDE SEAMLESS ACCESS TO VALUABLE SUPPLEMENTARY INFORMATION - SUCH AS OEM (ORIGINAL EQUIPMENT MANUFACTURER/DISTRIBUTOR) DOCUMENTS. EV ALSO ALLOWS VIEWER TO STUDY THE PLAN AND OEM DETAILS AT A MAGNIFICATION OF HIS CHOICE UP TO 6400%. IF A CONFLICT SHOULD OCCUR BETWEEN A DRAWING AND/OR SPECIFICATION HEREON AND AN OEM DETAIL, OEM SHALL PREVAIL. WIND IS THE ONLY LOAD OF SIGNIFICANCE FOR A ROOF-MOUNTED PV SYSTEM. PV MODULES (INCLUDING MOUNTING HARDWARE & RACKING) IMPOSE A LOAD OF LESS THAN 4-PSF. SNOW LOADS ARE UNAFFECTED BY AND DO NOT ADVERSELY AFFECT THE SOLAR EQUIPMENT. PV MOUNTING SYSTEM ALLOWS THE SOLAR EQUIPMENT TO ADJUST TO MOVEMENT IMPARTED BY SEISMIC EVENTS. THESE DRAWINGS AND ENGINEERING ESTABLISH THE INSTALLATION REQUIREMENTS FOR SPECIFIED PV EQUIPMENT ON BUILDINGS IN CALIFORNIA 60 FEET OR LESS IN HEIGHT AND AT ROOF ANGLES FROM FLAT UP TO 45 DEGREES. ENGINEER HAS EVALUATED THE INSTALLATION COMPONENTS AND HARDWARE CURRENTLY PROVIDED BY OEM AS ITS' OEM INSTALLATION KITS AND FOUND THEM TO MEET THE REQUIREMENTS OF THE CURRENT CBC (CALIFORNIA BUILDING CODE). THERE SHALL BE NO SUBSTITUTION OF OTHER VENDOR MATERIALS WITHOUT PRIOR APPROVAL OF ENGINEER. MATERIALS MANUFACTURED BY PROFESSIONAL SOLAR PRODUCTS INC. 1. ENGINEER OF RECORD (EOR) HAS DETERMINED THAT THE HOLD-DOWN HARDWARE AND FASTENERS SUPPLIED BY SOLAR ELECTRIC SUPPLY ARE ADEQUATE FOR DESIGN WIND SPEEDS EXCEEDING 120-MPH. ATTACHMENT MAY BE MADE BY LAGGING TO THE ROOF SHEETING IN ASCE ROOF PRESSURE ZONE 1 (PZ1) USING (MINIMUM) #14, CORROSION RESISTANT STEEL(CRS), LAGS. SELECT LENGTH ADQUATE TO FULLY PENETRATE ROOF SHEETING. IN PZ2 AND PZ3, LAGS SHALL PENETRATE A MINIMUM OF TWO INCHES INTO TRUSSES, BLOCKING, OR OTHER STRONG POINT. CONTRACTOR IS ENCOURAGED TO INSTALL IN PRESSURE ZONE 1 (PZ1) ONLY. THERE SHALL BE TWO RAILS UNDER EVERY PV MODULE. 4-HOLD-D0WNS SHALL ATTACH THE MODULES TO THE RAILS. RAILS SHALL ATTACH TO ROOF AT NOT GREATER THAN* 6-FT CENTER-TO-CENTER IN PZ1, NOT GREATER THAN* 4-FT CENTER TO CENTER IN PZ2, NOT GREATER THAN* 2-FT IN PZ3 (*NOTE THAT THESE DISTANCES CAN BE EXCEEDED BY UP TO 6-INCHES TO ACCOMMODATE IN-SITU RAFTER/TRUSS SPACING). 3. CONTRACTOR SHALL ADHERE TO REQUIREMENTS OF 2010 CBC (CALIFORNIA BUILDING CODE) CHAPTER 15 (ROOFING HTTP://PUBLICECODES.CITATION.COM/ST/CA/ST/B200V10/ST_CA_ST_B200V10_15_SECTION.HTM)AND BEST PRACTICES OF THE NRCA (NATIONAL ROOFING CONTRACTORS ASSOCIATION) ROOFING & WATERPROOFING MANUAL TO ENSURE THAT THE SOLAR INSTALLATION DOES NOT CAUSE ROOF LEAKS AT INITIAL INSTALLATION OR AS THE SYSTEM “AGES”. 4. ELECTRICAL GENERAL: PV-MODULES PRODUCE ELECTRICITY WHEN EXPOSED TO SUNLIGHT. USE COMMON-SENSE & CAUTION. TWISTED (WIRE NUT) CONNECTIONS ARE NOT PERMITTED FOR DC WIRING. USE OEM PLUG CONNECTOR HARNESS BETWEEN PV MODULES. MAKE SOLID MECHANICAL CONNECTIONS TO ENSURE ELECTRICAL CONDUCTIVITY BETWEEN ALL PV MODULE ENCLOSURES AND FRAMING MEMBERS WITH NO ELECTRICALLY ISOLATED COMPONENTS, USE #10 AWG BARE COPPER WITH SCREWED CONNECTIONS FOR BONDING JUMPERS AS NEEDED. OEM BONDING PLATES/LUGS/SPECIAL APARATUS ARE AN ACCEPTABLE SUBSTITUTE. DO NOT LEAVE LOOSE, UNSECURED WIRES/HARNESS BETWEEN PV-MODULES, TIE TO THE MOUNTING RAILS WITH UV RESISTANT ZIP TIES OR APPROVED WIRE CLIPS IN NEAT, PROFESSIONAL MANNER. USE APPROVED MEANS AND METHODS PER CURRENT NATIONAL ELECTRIC CODE (NEC). 5. CONTRACTORS, INSPECTORS, & PLAN REVIEWERS HAVING QUESTIONS, CONTACT EOR DIRECTLY - OFFICE: 813 909 1956, CELL: 813 650 7246, FAX: 866 397 9050, E-MAIL: [email protected] ELECTRICAL DRAWINGS BY OTHERS. REVIEWED BY E.O.R. CONSIDERED TO BE CODE COMPLIENT.

AN PE. INTELLECTUAL PROPERTY WHICH BELONGS TO ALLEN … · wind is the only load of significance for a roof-mounted pv system. pv modules (including mounting hardware & racking) impose

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Page 1: AN PE. INTELLECTUAL PROPERTY WHICH BELONGS TO ALLEN … · wind is the only load of significance for a roof-mounted pv system. pv modules (including mounting hardware & racking) impose

MPE 225

MPE 225

MPE 225

MPE 225

MPE 225

MPE 225

MPE 225

MPE 225

MPE 225

MPE 225

MPE 225

MPE 225

MPE 225

MPE 225

MPE 225

MPE 225

MPE 225MPE 225MPE 225

MPE 225

ROOF SLOPE 412 V.I.F.

PZ1

20 MODULES

PZ2

PZ2

PZ2

PZ3 PZ3

RAIL MOUNT ( TYP.)

SHEET NO:

PUBLISHED:

SHEET NAME:

DRAWN: CHECKED:SB AG

EN

LAR

GE

D V

IEW

ING

& H

YP

ER

LIN

KS

:P

RIN

T V

ER

SIO

N O

F T

HIS

PLA

N P

RO

VID

ES

MIN

IMU

M I

NF

OR

MA

TIO

N N

EE

DE

D B

Y U

SE

RS

.

ELE

CT

RO

NIC

VE

RS

ION

(E

V)

PR

OV

IDE

S M

AG

NIF

IED

VIE

WIN

G U

P T

O 6

40

0%

. E

V A

LSO

PR

OV

IDE

S H

YP

ER

LIN

KA

CC

ES

S T

O O

EM

MA

NU

ALS

AN

D A

BU

ND

AN

T O

TH

ER

SU

PP

LEM

EN

TA

RY

IN

FO

RM

AT

ION

.EV

MA

Y B

E

AC

CE

SS

ED

AT

: W

WW

.GE

ZE

LMA

NP

E.C

OM

/PV

/0

12

7P

_E

lle

nb

erg

er_

Bre

ntw

oo

d_

CA

.dw

g

REVISIONS:

ALLEN GEZELMAN16502 HANNA RD.LUTZ, FLORIDA 33549

PH. 813 650 7246FX. 866 397 9050Allen@Gezelman PE.COM

www.GezelmanPE.com

PE. # 34825

I CERTIFY THAT THIS DESIGN &SPECIFICATIONS MEET THEREQUIREMENTS OF THE CURRENTCALIFORNIA BUILDING CODE.

01SCALE: N.T.S.

BUILDING - STREET VIEW02

SCALE: N.T.S.

PARCEL - CONTRA COUNTY ASSESSOR

I CERTIFY THAT THE FRAMING OF THIS STRUCTURE WILL SAFELY ACCOMMODATE CALCULATED WIND UPLIFT AND LATERAL FORCES ANDEQUIPMENT DEAD LOADS. THIS IS ATTESTED TO BY MY SIGNATURE AND SEAL ON THIS DRAWING AT THE UPPER RIGHT.

CERTAIN DETAILS OF THIS PROJECT MAY DIFFER, REFER TO OEM LITERATURE WHICH SHALL PREVAIL.

03SCALE: N.T.S.

BUILDING SATELLITE IMAGE

INSTALLATION LOCATION ON OPPOSITE SITE

05http://www.civicsolar.com/sites/default/files/library/collateral/tilehook-install.pdf

MOUNTING SYSTEM - UNIRAC TILE HOOK

CONTRACTER RESPONSIBLE TO VERIFY THE FIT OF THIS ARRAY PRIOR TO INSTALLATION:THE SOLAR MODULE ARRAY SHOWN HERE IS BASED ON THE FIELD DATA PROVIDED BY THECONTRACTOR. CONTRACTOR SHALL CONTACT THE ENGINEER IF THE ARRAY MAY NOT FIT ASPROJECTED AND CHANGES TO LAYOUT OR LOCATION MAY BE REQUIRED.

C

OP

Y R

IGH

T &

IN

TE

LLE

CT

UA

L P

RO

PE

RT

Y N

OT

ICE

•T

HIS

PLA

N S

ET

IS

CO

PY

RIG

HT

PR

OT

EC

TE

D A

ND

CO

NT

AIN

S I

NT

ELL

EC

TU

AL

PR

OP

ER

TY

WH

ICH

BE

LON

GS

TO

ALL

EN

GE

ZE

LMA

N P

E.

•A

CC

ES

S I

S G

IVE

N T

O T

HE

IN

FO

RM

AT

ION

HE

RE

ON

SO

LELY

FO

R T

HE

PU

RP

OS

E O

F C

OM

PLE

TIO

N O

F T

HE

PR

OJE

CT

FO

R W

HIC

H I

T I

S I

NT

EN

DE

D.

•N

O O

TH

ER

US

E M

AY

BE

MA

DE

OF

TH

E I

NF

OR

MA

TIO

N,

DR

AW

ING

S,

OR

ID

EA

S H

ER

EO

N W

ITH

OU

T T

HE

EX

PR

ES

S,

WR

ITT

EN,

PE

RM

ISS

ION

OF

ALL

EN

GE

ZE

LMA

N P

E

ALL AFFIDAVITS, DESIGNS, OPINIONS, CALCULATIONS & OTHER ENGINEERING SERVICES PROVIDED BY ALLEN GEZELMAN PE AND

HIS ASSOCIATES ON ANY AND ALL PROJECTS ARE SUBJECT TO THE PROVISIONS OF EJCDC C-700 (ENGINEERS JOINT

CONSTRUCTION DOCUMENT COMMITTEE - STANDARD GENERAL CONDITIONS OF THE CONSTRUCTION CONTRACT) CURRENT ATTHE TIME. THOSE OBJECTING TO SAID EJCDC C-700 OR PROVISIONS THEREOF ARE DIRECTED NOT TO USE THE AFFIDAVIT,

DESIGN, OPINION, CALCULATION OR OTHER ENGINEERING SERVICE OFFERED BY BRUCE TOZIER PE AND HIS ASSOCIATES ON THE

PROJECT. EJCDC C-700 MAY BE VIEWED AT: HTTP://GEZELMANPE.COM/REFERENCE/AG/C-700.PDF

THIS PLAN IS VOID WITHOUT MY SIGNATURE & RAISEDSEAL. THIS PLAN MAY NOT BE PLACED ON FILE FOR PULLINGMULTIPLE PERMITS.EACH PERMIT PULLED REQUIRES ITS

OWN RAISED SEAL COPY OF THIS PLAN.

DESIGNED PER: ASCE 7-05

APPLICABLE CODE:

2010 CALIFORNIA BUILDING CODE

OWNER:

1820 Castellina Dr, Brentwood, CA 94513

Fred Ellenberger

INS

TA

LLA

TIO

N O

F A

SO

LAR

ELE

CT

RIC

SY

ST

EM

18

20

Ca

ste

llin

a D

r, B

ren

two

od

, C

A 9

45

13

RO

OF

MO

UN

T

EXPOSURE:

DESIGN WIND SPEED:

BLDG. IP. CATEGORY:

85MPHB

II

CONTRACTOR:

FLAGG BUILDING IMPROVEMENTS,

1420 CENTRAL AVE.

BRENTWOOD, CA 94513

LIC 621004

THIS PLAN IS ONLINE FOR REVIEW @WWW.GEZELMANPE.COM/PV/0127P_ELLENBERGER_BRENTWOOD_CA.PDF

06SCALE: 1"= 1'-0"

ROOF ATTACHMENT DETAIL

07SCALE: N.T.S.

PV MODULE - MPE 225 PS09

MAX. UPLIFT: PZ1_9.8 PSF; PZ2_17.0 PSF; PZ3_25.1 PSF

.

ASCE 7 PRESSURE ZONE DIAGRAM MAY BE VIEWED AT:

http://www.unirac.com/pdf/ii227.pdf

CONTRA COSTA COUNTYPROPERTY INFO: APN # 019550012

SITE DESCRIPTION: T8368 L12

04http://prosolar.com/prosolar-new/pages/rooftrac-main2.htm

PRO SOLAR - SUPPORT RAIL

PRO SOLAR SUPPORT RAIL - 2.5"

UNIRAC UNIVERSIAL MOUNT HOLD DOWN HARDWARE

UNIRAC UNIVERSIAL MOUNT INSTALLATION

07SCALE: 3/16" = 1'-0"

ROOF PLAN W/ 20 FLUSH MOUNT PV MODULES

INSTALLATION LOCATION

UNIRAC UNIVERSIAL MOUNT HOLD - SAMPLE PHOTO

ST

RU

CT

UR

AL

PE

RM

IT O

NLY

REMOVE SOLAR POOLHEATER

UTILITY (VIF.)

DICONNECT (VIF.)

CALIFORNIA PHOTO-VOLTAIC (PV) SYSTEM INSTALLATION NOTES:

THE DETAILS SPECIFIED ON THIS “PAPER” PLAN ARE CONSIDERED TO BE THE MINIMUM NEEDED BY USERS (AHJ -AUTHORITY HAVING JURISDICTION AND

INSTALLERS). USERS ARE ENCOURAGED TO ACCESS EV (ELECTRONIC VERSION) OF THIS PLAN:

WWW.GEZELMANPE.COM/PV/0129P_DURAN_DISCOVERYBAY_CA.PDF. ACTIVE HYPERLINKS EMBEDDED IN EV PROVIDE SEAMLESS ACCESS TO VALUABLE

SUPPLEMENTARY INFORMATION - SUCH AS OEM (ORIGINAL EQUIPMENT MANUFACTURER/DISTRIBUTOR) DOCUMENTS. EV ALSO ALLOWS VIEWER TO

STUDY THE PLAN AND OEM DETAILS AT A MAGNIFICATION OF HIS CHOICE UP TO 6400%. IF A CONFLICT SHOULD OCCUR BETWEEN A DRAWING AND/ORSPECIFICATION HEREON AND AN OEM DETAIL, OEM SHALL PREVAIL. WIND IS THE ONLY LOAD OF SIGNIFICANCE FOR A ROOF-MOUNTED PV SYSTEM. PV

MODULES (INCLUDING MOUNTING HARDWARE & RACKING) IMPOSE A LOAD OF LESS THAN 4-PSF. SNOW LOADS ARE UNAFFECTED BY AND DO NOTADVERSELY AFFECT THE SOLAR EQUIPMENT. PV MOUNTING SYSTEM ALLOWS THE SOLAR EQUIPMENT TO ADJUST TO MOVEMENT IMPARTED BY SEISMICEVENTS.

THESE DRAWINGS AND ENGINEERING ESTABLISH THE INSTALLATION REQUIREMENTS FOR SPECIFIED PV EQUIPMENT ON BUILDINGS IN CALIFORNIA 60FEET OR LESS IN HEIGHT AND AT ROOF ANGLES FROM FLAT UP TO 45 DEGREES. ENGINEER HAS EVALUATED THE INSTALLATION COMPONENTS ANDHARDWARE CURRENTLY PROVIDED BY OEM AS ITS' OEM INSTALLATION KITS AND FOUND THEM TO MEET THE REQUIREMENTS OF THE CURRENT CBC

(CALIFORNIA BUILDING CODE). THERE SHALL BE NO SUBSTITUTION OF OTHER VENDOR MATERIALS WITHOUT PRIOR APPROVAL OF ENGINEER. MATERIALSMANUFACTURED BY PROFESSIONAL SOLAR PRODUCTS INC.

1. ENGINEER OF RECORD (EOR) HAS DETERMINED THAT THE HOLD-DOWN HARDWARE AND FASTENERS SUPPLIED BY SOLAR ELECTRIC SUPPLY ARE

ADEQUATE FOR DESIGN WIND SPEEDS EXCEEDING 120-MPH. ATTACHMENT MAY BE MADE BY LAGGING TO THE ROOF SHEETING IN ASCE ROOF PRESSURE

ZONE 1 (PZ1) USING (MINIMUM) #14, CORROSION RESISTANT STEEL(CRS), LAGS. SELECT LENGTH ADQUATE TO FULLY PENETRATE ROOF SHEETING. IN PZ2

AND PZ3, LAGS SHALL PENETRATE A MINIMUM OF TWO INCHES INTO TRUSSES, BLOCKING, OR OTHER STRONG POINT. CONTRACTOR IS ENCOURAGED TO

INSTALL IN PRESSURE ZONE 1 (PZ1) ONLY. THERE SHALL BE TWO RAILS UNDER EVERY PV MODULE. 4-HOLD-D0WNS SHALL ATTACH THE MODULES TO THE

RAILS. RAILS SHALL ATTACH TO ROOF AT NOT GREATER THAN* 6-FT CENTER-TO-CENTER IN PZ1, NOT GREATER THAN* 4-FT CENTER TO CENTER IN PZ2,

NOT GREATER THAN* 2-FT IN PZ3 (*NOTE THAT THESE DISTANCES CAN BE EXCEEDED BY UP TO 6-INCHES TO ACCOMMODATE IN-SITU RAFTER/TRUSS

SPACING).

3. CONTRACTOR SHALL ADHERE TO REQUIREMENTS OF 2010 CBC (CALIFORNIA BUILDING CODE) CHAPTER 15 (ROOFING

HTTP://PUBLICECODES.CITATION.COM/ST/CA/ST/B200V10/ST_CA_ST_B200V10_15_SECTION.HTM)AND BEST PRACTICES OF THE NRCA (NATIONAL

ROOFING CONTRACTORS ASSOCIATION) ROOFING & WATERPROOFING MANUAL TO ENSURE THAT THE SOLAR INSTALLATION DOES NOT CAUSE ROOF

LEAKS AT INITIAL INSTALLATION OR AS THE SYSTEM “AGES”.

4. ELECTRICAL GENERAL:

• PV-MODULES PRODUCE ELECTRICITY WHEN EXPOSED TO SUNLIGHT. USE COMMON-SENSE & CAUTION.

• TWISTED (WIRE NUT) CONNECTIONS ARE NOT PERMITTED FOR DC WIRING. USE OEM PLUG CONNECTOR HARNESS BETWEEN PV MODULES.

• MAKE SOLID MECHANICAL CONNECTIONS TO ENSURE ELECTRICAL CONDUCTIVITY BETWEEN ALL PV MODULE ENCLOSURES AND FRAMING MEMBERSWITH NO ELECTRICALLY ISOLATED COMPONENTS, USE #10 AWG BARE COPPER WITH SCREWED CONNECTIONS FOR BONDING JUMPERS AS NEEDED.

OEM BONDING PLATES/LUGS/SPECIAL APARATUS ARE AN ACCEPTABLE SUBSTITUTE.

• DO NOT LEAVE LOOSE, UNSECURED WIRES/HARNESS BETWEEN PV-MODULES, TIE TO THE MOUNTING RAILS WITH UV RESISTANT ZIP TIES ORAPPROVED WIRE CLIPS IN NEAT, PROFESSIONAL MANNER.

• USE APPROVED MEANS AND METHODS PER CURRENT NATIONAL ELECTRIC CODE (NEC).

5. CONTRACTORS, INSPECTORS, & PLAN REVIEWERS HAVING QUESTIONS, CONTACT EOR DIRECTLY -

OFFICE: 813 909 1956, CELL: 813 650 7246, FAX: 866 397 9050, E-MAIL: [email protected]

ELECTRICAL DRAWINGS BY OTHERS.REVIEWED BY E.O.R. CONSIDERED TO BE CODE COMPLIENT.

Siggi
Snapshot
Siggi
Snapshot
Siggi
Snapshot
Page 2: AN PE. INTELLECTUAL PROPERTY WHICH BELONGS TO ALLEN … · wind is the only load of significance for a roof-mounted pv system. pv modules (including mounting hardware & racking) impose

CB120A

TO UTILITY METER

MAINBREAKER

3CB120A

PM1-20225W

1

2

1

2

SYSTEM SPECIFICATIONS

COMPONENT SPECIFICATIONS

OVER CURRENT PROTECTION DEVICES

REF. TYP. CURRENT RATING MAX. VOLTAGECB1 1 20A 240VACCB2 1 20A 240VAC

NOTES

INVERTER

REF. TYP. INVERTERNOMIINALOUTPUTVOLTAGE

NOMINALOUTPUT

FREQUENCY

MAXOUTPUTPOWER

MAX ACCURRENT

MAXINPUT

CURRENT

MAXINPUT

VOLTAGE

CECWEIGHTED

EFFICIENCYI1 20 ENPHASE M215-60-2LL-S22 240VAC 60HZ 215W 0.9A 10.5A 45V 96%

ARRAY STC POWER 2,250W 2,250WARRAY PTC POWER 2,041W 2,041WARRAY ISC 8.27A 8.27AARRAY IMP 7.55A 7.55AARRAY VOC 36.88V 36.88VARRAY VMP 29.76V 29.76VMAX SYSTEM VOLTAGE 45VDC 45VDCINVERTERS PER BRANCH 10 10MAX AC OUTPUT 2,150W 2,150WAC CURRENTCEC AC OUTPUT 1,959W 1,959WTOTAL ARRAY STC POWER 4,500WTOTAL ARRAY PTC POWER 4,082WTOTAL MAX AC OUTPUT 4,300WTOTAL AC CURRENT 18ATOTAL CEC AC OUTPUT 3,919W

OUTPUT OF INVERTERS IS CONNECTED TOUTILITY ON LOAD SIDE OF SERVICEDISCONNECT. OUTPUT IS BACKFED THROUGHBREAKER IN MAIN PANEL

THE FIRST AC CONNECTOR IN EACHMICROINVERTER BRANCH CIRCUIT IS SUITABLEAS A DISCONNECTING MEANSOUTDOOR-RATED SPLICE BOX RATED FOR250VAC

3

1

2

PHOTOVOLTAIC MODULEREF. TYP. MODULE STC POWER PTC POWER ISC IMP VOC VMP FUSE RATINGPM1 20 SCHUCO MPE-225-PS09 225W 225W 204.1W 8.27A 7.55A 36.9V 29.8V 15A

SCALE:

1

E1.1NTS

Terms and ConditionsSolar Electric Supply does not prepare or create electrical drawings, provide electrical or engineering services in any form. The technical material attached is provided by Verdiseno, Inc. , an Authorized Solar Electric Supply, Inc. partner. They are provided at no cost as ñtechnical reference materialò only. It's is the recipients responsibility to determine if the technical reference material is applicableto their particular project. All technical material should be reviewed by a licensed contractor or engineer. All solar system components should be installed by a licensed experienced electrical contractor or technician and should follow NEC and local building department guidelines. Acceptance and use of any products or materials provided by Solar Electric Supply, Inc and or any of its partners orsubsidiaries constitutes an agreement that all parties agree to fix the amount of actual damages the Customer would incur in the event the products sold or materials provided by Solar Electric Supply, Inc. are defective. It would be impracticable or extremely difficult to determine if any item or material is defective and the parties hereto agree the amount of $500.00 would be fair compensation forany loss sustained by the Customer and further agree this amount is reasonable under the circumstances at this time. Distribution or publication of any technical material, documents or literature provided by Solar Electric Supply, Inc. and or any of its partners or subsidiaries is strictly prohibited without written authorization from Solar Electric Supply, Inc.

Page 3: AN PE. INTELLECTUAL PROPERTY WHICH BELONGS TO ALLEN … · wind is the only load of significance for a roof-mounted pv system. pv modules (including mounting hardware & racking) impose

21 21

10 MODULES10 MICROINVERTERS

IN BRANCH CIRCUIT

21 21

10 MODULES10 MICROINVERTERS

IN BRANCH CIRCUIT

N PE

TO UTILITY METER

MAIN

3

CONDUCTOR LEADS ON MODULES SHOULD BE SECURELY FASTENED TO RACKING TOPREVENT ABRASIVE DAMAGE. USE A SECURING METHOD THAT WILL WITHSTAND HIGHTEMPERATURES AND SUNLIGHT, SUCH AS STAINLESS STEEL PIPE CLAMPS WITH AN EDPMINSERT (PLASTIC TIES ARE NOT RECOMMENDED).

1

EXISTING AC LOAD CENTER MUST MEET REQUIREMENTS OF NEC 690.64(b)(2). SUM OF MAINBREAKER PLUS SOLAR BREAKER (S) MUST BE LESS THAN OR EQUAL TO BUS RATING. IFBACKFED BREAKERS ARE MOUNTED AT OPPOSITE END OF BUS FROM MAIN BREAKER ORFEEDER, THE SUM OF SOLAR BREAKERS AND MAIN BREAKER MAY BE EQUAL TO OR LESSTHAN 120% OF BUS RATING.

3

RECOMMENDED WIRECONDUCTOR WIRE DISTANCE GROUND

NO. TYPE SIZE 1.0% V DROP TYPE SIZE1 THWN-2 12AWG 68FT THWN-2 12AWG

RECOMMENDED WIRING LIST IS SUGGESTIVE ONLY. INSTALLER IS RESPONSIBLE FOR DETERMINING HOW THE WIRES WILL BE RUN, CONDUIT SIZING,AND FINAL WIRE SIZING.

MODULE CONNECTORS ARE NOT LISTED TO BE DISCONNECTED UNDER LOAD.!

ENPHASE AC INTERCONNECT CABLE CONNECTES TO AC JUNCTION BOX. ORANGECONDUCTOR NOT USED.2

ALWAYS USE MANUFACTURER'S RECOMMENDED GROUND-BAR KITS TO GROUND4

1

SCALE:

1

E2.1NTS

Terms and ConditionsSolar Electric Supply does not prepare or create electrical drawings, provide electrical or engineering services in any form. The technical material attached is provided by Verdiseno, Inc. , an Authorized Solar Electric Supply, Inc. partner. They are provided at no cost as ñtechnical reference materialò only. It's is the recipients responsibility to determine if the technical reference material is applicableto their particular project. All technical material should be reviewed by a licensed contractor or engineer. All solar system components should be installed by a licensed experienced electrical contractor or technician and should follow NEC and local building department guidelines. Acceptance and use of any products or materials provided by Solar Electric Supply, Inc and or any of its partners orsubsidiaries constitutes an agreement that all parties agree to fix the amount of actual damages the Customer would incur in the event the products sold or materials provided by Solar Electric Supply, Inc. are defective. It would be impracticable or extremely difficult to determine if any item or material is defective and the parties hereto agree the amount of $500.00 would be fair compensation forany loss sustained by the Customer and further agree this amount is reasonable under the circumstances at this time. Distribution or publication of any technical material, documents or literature provided by Solar Electric Supply, Inc. and or any of its partners or subsidiaries is strictly prohibited without written authorization from Solar Electric Supply, Inc.