Zone 3 South Central/Southwest Wisconsin and North Central Illinois October 2009 An excerpt from ATC’s 2009 10-Year Transmission System Assessment Proposals to ensure n Electric system reliability n Access to low-cost sources of power n Access to renewable energy www.atc10yearplan.com COLUMBIA CRAWFORD (southern portion) DANE DODGE GRANT GREEN IOWA LAFAYETTE JEFFERSON RICHLAND ROCK SAUK WALWORTH WINNEBAGO, ILL. (northern portion)

An excerpt from ATC’s 2009 10-Year Transmission System ... · While the cost estimate in our 2009 Assessment is slightly less than the $2.7 billion identified in last year’s report,

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: An excerpt from ATC’s 2009 10-Year Transmission System ... · While the cost estimate in our 2009 Assessment is slightly less than the $2.7 billion identified in last year’s report,

Zone 3 South Central/Southwest Wisconsin and North Central Illinois

October 2009

An excerpt from ATC’s

2009

10-Year Transmission System AssessmentProposals to ensure

n Electric system reliability

n Access to low-cost sources of power

n Access to renewable energy

www.atc10yearplan.com

ColumbiA

CrAwford (southern portion)

dAne

dodge

grAnT

green

iowA

lAfAYeTTe

JefferSon

riChlAnd

roCk

SAuk

wAlworTh

winnebAgo, ill.(northern portion)

Page 2: An excerpt from ATC’s 2009 10-Year Transmission System ... · While the cost estimate in our 2009 Assessment is slightly less than the $2.7 billion identified in last year’s report,

1

Planning for future reliability American Transmission Co. was formed in 2001 to plan, permit, build, own, operate and maintain a high-voltage electric grid that meets the reliability and economic needs of our customers. Our planners continually conduct engineering studies on the electric transmission system looking for potential problems that may affect the future performance of the system. Our studies identify and prioritize future projects needed to improve the adequacy and reliability of the electric transmission system and meet evolving public priorities for increased availability of renewable generation.

Many projects serve to increase customer access to low-cost generation, which can reduce the cost of serving load in our footprint. In certain cases, expected economic benefits may be the primary driver of a project. Such is the case with our Paddock-Rockdale 345-kV line in southern Wisconsin. It is the first of its kind in the Midwest – while the line will enhance reliability, economics drove the decision to build. Local electric utilities will save through improved access to the wholesale electric market, and those savings will be passed on to end-use electric customers.

Whatever the need, we select best-value projects that resolve multiple system issues, and we do so in a transparent, collaborative process. We bring people into the process, engaging stakeholders in transmission discussion. We believe this open collaboration is critical to efficiently and economically meet renewable portfolio standards in the region. To that end, we are leading and participating in about a dozen regional and intra-regional studies and initiatives. We also are continuing to work with stakeholders in identifying projects that provide economic

benefits and upgrades that could improve access to lower-cost sources of power inside and outside our service territory.

In this, our ninth year of producing a 10-year forecast of transmission system needs, our focus remains on maintaining the adequacy and reliability of the system to meet the current and future needs of our customers. However, this is the first year that we have included asset renewal projects in the Assessment. While our reliability performance data indicates that our system is performing well, we are placing increased emphasis on managing the risk of aging infrastructure. Our approach to work that traditionally has been called maintenance is moving from a time-based program to a more-efficient process that is informed by performance analysis and operational experience.

The 2009 Assessment covers the years 2010 to 2019, and identifies $2.5 billion in necessary transmission system improvements. The total includes $1 billion for transmission network upgrades specifically described in this report, along with $1.5 billion in interconnection and asset renewal projects, infrastructure replacements and relocations, and other smaller network reliability improvements.

While the cost estimate in our 2009 Assessment is slightly less than the $2.7 billion identified in last year’s report, we may increase our overall 10-year capital spending because of increased focus on regional transmission support to move renewable generation to areas where the power is needed. With more than $2.1 billion invested in the system since 2001, we have become a recognized, national leader in planning, permitting and building electric transmission infrastructure.

Cost estimate of system improvements 2005 2006 2007 2008 2009

Total 10-Year Capital Cost $3.4B $3.1B $2.8B $2.7B $2.5b

Helping to keep the lights on, businesses running and communities strong™

Page 3: An excerpt from ATC’s 2009 10-Year Transmission System ... · While the cost estimate in our 2009 Assessment is slightly less than the $2.7 billion identified in last year’s report,

2

Electric System Overviewincreases expected in population, employmentPopulation in Zone 3 is projected to grow about 1 percent annually between now and 2019, and employment is projected to grow about 1.4 percent each year for the same time period. Dane County is projected to realize the largest increase in population and employment.

higher-than-average demand anticipatedElectric load is expected to grow approximately 2.4 percent annually through 2019 for all of Zone 3. Demand in Dane County is projected to grow at an above-average rate for the ATC system. High demand coupled with generation retirements, concerns about the age and high cost of remaining generators, and stress on the transmission lines that are critical for importing power to Dane County will continue to increase.

South Central/Southwest wisconsin and north Central illinois – Zone 3

Transmission is the vital link in bringing power to communitiesTransmission lines move electricity at high voltages over long distances – from power plants to communities

where local utilities deliver power to homes and businesses via distribution lines. A reliable transmission network

provides access to many sources of power, whether they are local or regional. having multiple paths to get power

from producers to consumers lessens the chance that they will experience service interruptions. with an increasing

emphasis on renewable energy, transmission system planning will become even more important to put the power

of wind on the wires.

www.atc10yearplan.com

Page 4: An excerpt from ATC’s 2009 10-Year Transmission System ... · While the cost estimate in our 2009 Assessment is slightly less than the $2.7 billion identified in last year’s report,

Eden

Okee

Alto

Elmo

Dane

Lodi

Troy

Tokay

LaMar

South

Arena

Eagle

Burke

Rewey

Syene

Miner

McCue

Zenda

Wiota

Zobel

Avoca

Cooney

Waupun

Viking

Kieler

Sharon

Wingra

Auburn

Summit

Nishan

Seneca

Wilcox

London

Blount

Verona

Island

Benton

Barton

Sussex

Turtle

Marine

Pflaum

Ruskin

Roeder

Oregon

Potosi

Elkhorn

Bird St

Mendota

Rubicon

Traxler

Muscoda

Glacier

Macy St

TibbitsRussell

Sanborn

Hubbard

Horicon

Metomen

Cambria

Kegonsa

Gateway

Trienda

Femrite

Mauston

Wonewoc

Sunrise

Venture

Portage

Baraboo

Forward

Delavan

Brandon

Wauzeka

Academy

Paddock

Hampden

AGA Gas

BelmontHillman

Waukesha

Park Ave

Rockdale

Montello

Deforest

Finnegan

Boscobel

Oakfield

Parkview

Cranston

Boxelder

Brooklyn

Kirkwood

Koch Oil

Poynette

Merrimac

Artesian

Tichigan

Ohmstead

Hartford

Walworth

American

Hillside

Mayville

Colorado

Huiskamp

Moore St

Brisbois

Arcadian

Markesan

Endeavor

Kilbourn

Edgewood

Randolph

Tripp Rd

Sprecher

Brodhead

Westport

Richland

Fox Hills

Morris St

Rosendale

Dana Corp

Footville

Ledgeview

RCEC Shaw

Reiner Rd

Birchwood

DPC Elroy

Lancaster

La Pointe

Arlington

ACEC Glen

Lone Rock

Gran Grae

Cassville

Butternut

Sheepskin

Idle Hour

Browntown

Cuba City

Center St

Cambridge

Gaston Rd

Reedsburg

Hillsboro

Mukwonago

JeffersonMcFarland

Lands End

Sadoff Co

Stoughton

Mazomanie

Lafayette

Colley Rd

Fitchburg

Rock River

East Towne

Shullsburg

Hustisford

West Towne

Darlington

Hickory St

DPC LaMont

Blue River

Glen Haven

Burlington

Scot Forge

North Side

Eagle View

DPC Argyle

Fall River

Katzenberg

Dell Creek

Bark River

Christiana

Bass Creek

Blacksmith

Dodgeville

Gays Mills

Whitewater

Walnut GIS

Belleville

Timberlane

New Glarus

Loganville

Lake Delton

Rienzi Road

BOC Grasses

Hooterville

St Lawrence

Willow Lawn

Cobblestone

Waupun Main

RCEC Center

Sun Prairie

Dam Heights

Bluff Creek

West Darien

East Beloit

Sugar Creek

Orfordville

Black Earth

King (king)

Lake Geneva

RCEC Newark

DPC Gratiot

Bloomington

Pardeeville

Manley Sand

Rock Branch

Air Liquide

Arthur Road

ACEC Roslin

Hamilton St

Mount Horeb

James Olson

Spring Brook

RCEC Harmony

East Rockton

Butler Ridge

Williams Bay

Stoney Brook

RCEC Fulton

Yahara River

Sauk Prairie

Spring Green

DPC Stoneman

Brick Church

ACEC Calamus

Union Center

Spring Grove

Shirland Ave

Cross Plains

ACEC Chateau

Duplainville

ACEC Cambria

Neenah Creek

North Monroe

South Monroe

Rock Springs

West Mauston

Concord SW YD

Fort Atkinson

Mineral Point

North Madison

RCEC Bradford

Pioneer(ALTE)

Boscobel Muni

Cottage Grove

Cross Country

Business Park

ACEC Lewiston

Merrill Hills

Albany (ALTE)

Pleasant View

Bristol (ALTE)

RCEC LaPrairieBrodhead North

Wyoming Valley

North Randolph

Saunders Creek

Monroe Central

Hilltop (ALTE)

Mercury Marine

Stoughton East

Blanchardville

New Hollandale

Clinton (ALTE)

Columbus South

Lyndon Station

DPC Shullsburg

ACEC Winnebago

Colloday Point

Brodhead South

Dorset Corners

University (WE)

DPC Platteville

Crawfish River

Badger Pump STA

Pheasant Branch

Pleasant Valley

Evansville Muni

Fox Lake (ALTE)

North Stoughton

Centennial Park

Cottonwood (WE)

Columbus (ALTE)

Division Street

Milwaukee Valve

Twin Lakes (WE)

Mcgregor (ALTE)

DPC Bell Center

ACEC Doylestown

Beaver Dam East

Columbus Muni 1

Stoughton South

Brodhead SW STA

Lakehead Delavan

North Beaver Dam

RCEC Orfordville

Brodhead Central

Lakehead Portage

Tower Substation

Northwest Beloit

Portage Ind Park

Juneau Northside

Mackford Prairie

Caledonia (ALTE)Horicon Ind Park

South Beaver Dam

Lakehead Waterloo

Beaver Dam 3rd St

Green Lake SW STA

New London (ALTW)

North Lake Geneva

Pine River (ALTE)

South Lake Geneva

Southwest Delavan

Monticello (ALTE)

Lakehead Cambridge

Summit Lake (ALTW)

Nelson Dewey SW YD

DPC Lyndon Station

Jennings Rd SW STA

Stage Coach SW STA

Rio Pumping Station

Lodi Industrial Park

Prairie Du Sac Plant

Columbia SW YD (ALTE)

Mazomainie Industrial

Prairie Du Sac 9th St

Forward Energy Center

Kettle Morraine (ALTE)

Blackhawk SW YD (ALTE)

Boscobel Muni Eastside

Lancaster Distribution

Wisconsin Dells Muni 2

Badger Ordinance Works

North East Mount Horeb Muni

PewaukeeMadison

Fitchburg

Delafield

Portage

Steuben Watertown

Janesville

Beloit

Pewaukee

Waukesha

Fond du Lac

West Bend

Elkhorn

Sun Prairie

Sussex

Delavan

Middleton

Hartford

Baraboo

Twin Lakes

Waunakee

Monroe

Lake Delton

Wauzeka

Burlington

Beaver Dam

HartlandOconomowoc

Jefferson

De Forest

Reedsburg

Bell Center

Slinger

New Berlin

Milton

Chenequa

Mauston

Lake Geneva

Whitewater

Verona

Horicon

Waterloo

Germantown

Gays Mills

Eastman

Platteville

Oregon Stoughton

Viroqua

Wales

Prairie du Chien

Columbus

Mukwonago

Fort Atkinson

East Troy

Avoca

Merton

Edgerton

Lake Mills

Rio

Elroy

Mayville

Doylestown

Dodgeville

McFarland

Westby

Lodi

Lancaster

Poynette

Richland Center

Waupun

Potosi

Lomira

Boscobel

Williams Bay

Ferryville

Waterford

Big Bend

Markesan

Soldiers Grove

Montello

Eagle

Jackson

Juneau

Dane

Mount Horeb

Mineral Point

Evansville

Pardeeville

North Prairie

Marshall

Darien

Genoa City

Arena

Albany

Nashotah

Clinton

Kingston

Cobb

Oconomowoc Lake

Wyocena

Sauk City

Readstown

Fox Lake

Cottage Grove

La Crosse

Palmyra

Walworth

Johnson Creek

Lowell

Merrimac

Lynxville

Plain

Oxford

Wisconsin Dells

Sullivan Dousman

Ontario

Kewaskum

Barneveld

Hillsboro

Fennimore

Sharon

Lyndon Station

Cambria

Cashton

Ridgeway

Belleville

Wilton

DeerfieldHighland

New Glarus

Mazomanie

Viola

La Farge

Benton

Bagley

Friesland

Oakfield

Footville

Linden

Rosendale

Lone Rock

Monticello

Orfordville

Muscoda

Wonewoc

Shullsburg

Eden

Rock Springs

Darlington

Spring Green

Theresa

Hazel Green

Cross Plains

Cuba City

Cassville

De Soto

Kendall

Mount Sterling

Bloomington

Hustisford

Cazenovia

Brandon

Browntown

Argyle

Randolph

Lime Ridge

Coon Valley

Gratiot

Campbellsport

Fairwater

Livingston

Dickeyville

Endeavor

Rewey

Boaz Arlington

Blue River

Belmont

Iron Ridge

Hollandale

Cambridge

Union Center

South Wayne

Brooklyn

Reeseville

North Freedom

Melvina

Chaseburg

Montfort

Black Earth

Blue Mounds

Yuba

Rochester

Lac La Belle

La Valle

Ironton

Tennyson

Marquette

Norwalk

Brownsville

Patch Grove

Clyman

RockdaleMount Hope

Kekoskee

Blanchardville

Woodman

Loganville

St. Cloud

D a n e

G r a n t

S a u k

I o w a

R o c k

D o d g e

V e r n o n

G r e e n

C o l u m b i a

L a f a y e t t e

R i c h l a n d

C r a w f o r d

W a l w o r t h

J e f f e r s o n

W a u k e s h a

F o n d d u L a c

J u n e a uM o n r o e

W a s h i n g t o n

A d a m s M a r q u e t t eG r e e n L a k e

R a c i n e

L a C r o s s e

K e n o s h a

S h e b o y g a n

Fen Oak

Cottage Grove

3

Transmission system characteristics in Zone 3ATC delivers power in Zone 3 with various transmission facilities including:

n a north-south 345-kV line from Illinois extending to Columbia Power Plant

n a north-south 345-kV line from Illinois extending to Paddock Substation

n an east-west 345-kV line from Fond du Lac to Columbia Power Plant and

n 138-kV and 69-kV facilities throughout the remainder of the zone.

There are a number of transmission system performance issues in Zone 3 including voltage instability, limited import capability, overloaded lines and equipment, and low system voltages throughout the zone. The causes of these emerging problems include steady or rapid growth in certain areas, import capability from Illinois, new power plants and different generation dispatch scenarios.

At the start of our Assessment process in October 2008 the Nelson Dewey third generator was deemed likely to move forward, but in early 2009, the generator was withdrawn from the queue. We performed additional analyses to determine the impact of that action, and determined the withdrawal of the third generator and its associated transmission projects did not cause significant impact on the transmission system in Zone 3.

Transmission system limitations in Zone 3In the analysis of Zone 3, we identified low voltages and transmission facility overloads. Low voltages are particularly serious in the Spring Green, Jefferson, Milton and Brodhead areas. Many overloads on 138-kV and 69-kV facilities throughout Zone 3 are current or emerging concerns.

Electric load growth in Dodge and Walworth counties is precipitating the need for major new 138-kV line reinforcements in those areas in the 2012-2018 timeframe. Load growth in southwestern Wisconsin also will necessitate reinforcements to the transmission system in the 2009-2016 timeframe. In addition, the potential for voltage collapse and major 138-kV line thermal overloads in the Madison area is emerging and will require significant transmission reinforcements within the next 10 years.

System Limitations South Central/Southwest wisconsin and north Central illinois – Zone 3DANE

SAUK COLUMBIA

LAFAYETTE GREEN ROCK WALWORTH

JEFFERSON

DODGE CRAWFORD

IOWA

GRANT

RICHLAND

WINNEBAGO, ILL

Page 5: An excerpt from ATC’s 2009 10-Year Transmission System ... · While the cost estimate in our 2009 Assessment is slightly less than the $2.7 billion identified in last year’s report,

Eden

Okee

Alto

Elmo

Dane

Lodi

Troy

Tokay

LaMar

South

Arena

Eagle

Burke

Rewey

Syene

Miner

McCue

Zenda

Wiota

Zobel

Avoca

Cooney

Waupun

Viking

Kieler

Sharon

Wingra

Auburn

Summit

Nishan

Seneca

Wilcox

London

Blount

Verona

Island

Benton

Barton

Sussex

Turtle

Marine

Pflaum

Ruskin

Roeder

Oregon

Potosi

Elkhorn

Bird St

Mendota

Rubicon

Traxler

Muscoda

Glacier

Macy St

TibbitsRussell

Sanborn

Hubbard

Horicon

Metomen

Cambria

Kegonsa

Gateway

Trienda

Femrite

Mauston

Wonewoc

Sunrise

Venture

Portage

Baraboo

Forward

Delavan

Brandon

Wauzeka

Academy

Paddock

Hampden

AGA Gas

BelmontHillman

Waukesha

Park Ave

Rockdale

Montello

Deforest

Finnegan

Boscobel

Oakfield

Parkview

Cranston

Boxelder

Brooklyn

Kirkwood

Koch Oil

Poynette

Merrimac

Artesian

Tichigan

Ohmstead

Hartford

Walworth

American

Hillside

Mayville

Colorado

Huiskamp

Moore St

Brisbois

Arcadian

Markesan

Endeavor

Kilbourn

Edgewood

Randolph

Tripp Rd

Sprecher

Brodhead

Westport

Richland

Fox Hills

Morris St

Rosendale

Dana Corp

Footville

Ledgeview

RCEC Shaw

Reiner Rd

Birchwood

DPC Elroy

Lancaster

La Pointe

Arlington

ACEC Glen

Lone Rock

Gran Grae

Cassville

Butternut

Sheepskin

Idle Hour

Browntown

Cuba City

Center St

Cambridge

Gaston Rd

Reedsburg

Hillsboro

Mukwonago

JeffersonMcFarland

Lands End

Sadoff Co

Stoughton

Mazomanie

Lafayette

Colley Rd

Fitchburg

Rock River

East Towne

Shullsburg

Hustisford

West Towne

Darlington

Hickory St

DPC LaMont

Blue River

Glen Haven

Burlington

Scot Forge

North Side

Eagle View

DPC Argyle

Fall River

Katzenberg

Dell Creek

Bark River

Christiana

Bass Creek

Blacksmith

Dodgeville

Gays Mills

Whitewater

Walnut GIS

Belleville

Timberlane

New Glarus

Loganville

Lake Delton

Rienzi Road

BOC Grasses

Hooterville

St Lawrence

Willow Lawn

Cobblestone

Waupun Main

RCEC Center

Sun Prairie

Dam Heights

Bluff Creek

West Darien

East Beloit

Sugar Creek

Orfordville

Black Earth

King (king)

Lake Geneva

RCEC Newark

DPC Gratiot

Bloomington

Pardeeville

Manley Sand

Rock Branch

Air Liquide

Arthur Road

ACEC Roslin

Hamilton St

Mount Horeb

James Olson

Spring Brook

RCEC Harmony

East Rockton

Butler Ridge

Williams Bay

Stoney Brook

RCEC Fulton

Yahara River

Sauk Prairie

Spring Green

DPC Stoneman

Brick Church

ACEC Calamus

Union Center

Spring Grove

Shirland Ave

Cross Plains

ACEC Chateau

Duplainville

ACEC Cambria

Neenah Creek

North Monroe

South Monroe

Rock Springs

West Mauston

Concord SW YD

Fort Atkinson

Mineral Point

North Madison

RCEC Bradford

Pioneer(ALTE)

Boscobel Muni

Cottage Grove

Cross Country

Business Park

ACEC Lewiston

Merrill Hills

Albany (ALTE)

Pleasant View

Bristol (ALTE)

RCEC LaPrairieBrodhead North

Wyoming Valley

North Randolph

Saunders Creek

Monroe Central

Hilltop (ALTE)

Mercury Marine

Stoughton East

Blanchardville

New Hollandale

Clinton (ALTE)

Columbus South

Lyndon Station

DPC Shullsburg

ACEC Winnebago

Colloday Point

Brodhead South

Dorset Corners

University (WE)

DPC Platteville

Crawfish River

Badger Pump STA

Pheasant Branch

Pleasant Valley

Evansville Muni

Fox Lake (ALTE)

North Stoughton

Centennial Park

Cottonwood (WE)

Columbus (ALTE)

Division Street

Milwaukee Valve

Twin Lakes (WE)

Mcgregor (ALTE)

DPC Bell Center

ACEC Doylestown

Beaver Dam East

Columbus Muni 1

Stoughton South

Brodhead SW STA

Lakehead Delavan

North Beaver Dam

RCEC Orfordville

Brodhead Central

Lakehead Portage

Tower Substation

Northwest Beloit

Portage Ind Park

Juneau Northside

Mackford Prairie

Caledonia (ALTE)Horicon Ind Park

South Beaver Dam

Lakehead Waterloo

Beaver Dam 3rd St

Green Lake SW STA

New London (ALTW)

North Lake Geneva

Pine River (ALTE)

South Lake Geneva

Southwest Delavan

Monticello (ALTE)

Lakehead Cambridge

Summit Lake (ALTW)

Nelson Dewey SW YD

DPC Lyndon Station

Jennings Rd SW STA

Stage Coach SW STA

Rio Pumping Station

Lodi Industrial Park

Prairie Du Sac Plant

Columbia SW YD (ALTE)

Mazomainie Industrial

Prairie Du Sac 9th St

Forward Energy Center

Kettle Morraine (ALTE)

Blackhawk SW YD (ALTE)

Boscobel Muni Eastside

Lancaster Distribution

Wisconsin Dells Muni 2

Badger Ordinance Works

North East Mount Horeb Muni

PewaukeeMadison

Fitchburg

Delafield

Portage

Steuben Watertown

Janesville

Beloit

Pewaukee

Waukesha

Fond du Lac

West Bend

Elkhorn

Sun Prairie

Sussex

Delavan

Middleton

Hartford

Baraboo

Twin Lakes

Waunakee

Monroe

Lake Delton

Wauzeka

Burlington

Beaver Dam

HartlandOconomowoc

Jefferson

De Forest

Reedsburg

Bell Center

Slinger

New Berlin

Milton

Chenequa

Mauston

Lake Geneva

Whitewater

Verona

Horicon

Waterloo

Germantown

Gays Mills

Eastman

Platteville

Oregon Stoughton

Viroqua

Wales

Prairie du Chien

Columbus

Mukwonago

Fort Atkinson

East Troy

Avoca

Merton

Edgerton

Lake Mills

Rio

Elroy

Mayville

Doylestown

Dodgeville

McFarland

Westby

Lodi

Lancaster

Poynette

Richland Center

Waupun

Potosi

Lomira

Boscobel

Williams Bay

Ferryville

Waterford

Big Bend

Markesan

Soldiers Grove

Montello

Eagle

Jackson

Juneau

Dane

Mount Horeb

Mineral Point

Evansville

Pardeeville

North Prairie

Marshall

Darien

Genoa City

Arena

Albany

Nashotah

Clinton

Kingston

Cobb

Oconomowoc Lake

Wyocena

Sauk City

Readstown

Fox Lake

Cottage Grove

La Crosse

Palmyra

Walworth

Johnson Creek

Lowell

Merrimac

Lynxville

Plain

Oxford

Wisconsin Dells

Sullivan Dousman

Ontario

Kewaskum

Barneveld

Hillsboro

Fennimore

Sharon

Lyndon Station

Cambria

Cashton

Ridgeway

Belleville

Wilton

DeerfieldHighland

New Glarus

Mazomanie

Viola

La Farge

Benton

Bagley

Friesland

Oakfield

Footville

Linden

Rosendale

Lone Rock

Monticello

Orfordville

Muscoda

Wonewoc

Shullsburg

Eden

Rock Springs

Darlington

Spring Green

Theresa

Hazel Green

Cross Plains

Cuba City

Cassville

De Soto

Kendall

Mount Sterling

Bloomington

Hustisford

Cazenovia

Brandon

Browntown

Argyle

Randolph

Lime Ridge

Coon Valley

Gratiot

Campbellsport

Fairwater

Livingston

Dickeyville

Endeavor

Rewey

Boaz Arlington

Blue River

Belmont

Iron Ridge

Hollandale

Cambridge

Union Center

South Wayne

Brooklyn

Reeseville

North Freedom

Melvina

Chaseburg

Montfort

Black Earth

Blue Mounds

Yuba

Rochester

Lac La Belle

La Valle

Ironton

Tennyson

Marquette

Norwalk

Brownsville

Patch Grove

Clyman

RockdaleMount Hope

Kekoskee

Blanchardville

Woodman

Loganville

St. Cloud

D a n e

G r a n t

S a u k

I o w a

R o c k

D o d g e

V e r n o n

G r e e n

C o l u m b i a

L a f a y e t t e

R i c h l a n d

C r a w f o r d

W a l w o r t h

J e f f e r s o n

W a u k e s h a

F o n d d u L a c

J u n e a uM o n r o e

W a s h i n g t o n

A d a m s M a r q u e t t eG r e e n L a k e

R a c i n e

L a C r o s s e

K e n o s h a

S h e b o y g a n

Fen Oak

Cottage Grove

4

Low voltagesOverloaded facilityNew generation/stabilityTransmission needed for load growthTransmission service limiter

System Limitations

Page 6: An excerpt from ATC’s 2009 10-Year Transmission System ... · While the cost estimate in our 2009 Assessment is slightly less than the $2.7 billion identified in last year’s report,

1

2 46

78

9

10

12

13

14

T

T

T

C

C

C

C

C

C

T

T

T

T

T

T

SM

SM

SM

SM

SM

SM

SM

SM

SM

SM

SM

SM SM

SM

SMSM

T-D

C

CC

C

C

C

C

C

C

C

C

C

C

C

C

SM

SM

SM

SM

SM

SM

SM

SM

SM

SM

SM

SM

SM

SM

SM

SM

Eden

Okee

Alto

Elmo

Dane

Lodi

Troy

Tokay

LaMar

South

Syene

Arena

Eagle

Burke

Rewey

Miner

McCue

Zenda

Wiota

Zobel

Avoca

Cooney

Waupun

Viking

Kieler

Sharon

Auburn

Summit

Nishan

Seneca

Wilcox

London

Verona

Island

Benton

Barton

Sussex

TurtleMarine

Pflaum

Ruskin

Roeder

Oregon

Potosi

Elkhorn

Bird St

Rubicon

Traxler

Muscoda

Glacier

Macy St

TibbitsRussell

Sanborn

HubbardHoricon

Metomen

Cambria

Kegonsa

Trienda

Femrite

Mauston

Wonewoc

Sunrise

Venture

Portage

Baraboo

Forward

Delavan

Brandon

Wauzeka

Academy

Paddock

Hampden

Belmont

Hillman

Waukesha

Park Ave

Rockdale

Montello

Deforest

Finnegan

Boscobel

Oakfield

Cranston

Boxelder

Brooklyn

Kirkwood

Koch Oil

Poynette

Merrimac

Artesian

Tichigan

Ohmstead

Hartford

Walworth

American

Hillside

Mayville

Colorado

Huiskamp

Moore St

Brisbois

MarkesanEndeavor

Kilbourn

Edgewood

Randolph

Tripp Rd

Sprecher

Brodhead

Westport

Richland

Morris St

Rosendale

Dana Corp

Footville

Ledgeview

RCEC Shaw

Reiner Rd

Birchwood

DPC Elroy

Lancaster

La Pointe

Arlington

ACEC Glen

Lone Rock

Gran Grae

Cassville

Butternut

Sheepskin

Idle Hour

Browntown

Cuba City

Center St

Cambridge

Gaston Rd

Reedsburg

Hillsboro

Mukwonago

JeffersonMcFarland

Lands End

Sadoff Co

Stoughton

Mazomanie

Lafayette

Colley Rd

Fitchburg

Rock River

East Towne

Shullsburg

Hustisford

West Towne

Darlington

Hickory St

DPC LaMont

Blue River

Glen Haven

Burlington

Scot Forge

North Side

Eagle View

DPC Argyle

Fall River

Katzenberg

Dell Creek

Bark River

Christiana

Bass Creek

Blacksmith

Dodgeville

Gays Mills

Whitewater

Walnut GIS

Belleville

Timberlane

New Glarus

Loganville

BOC Grasses

Lake Delton

Loch Mirror

Hooterville

St Lawrence

Willow Lawn

Cobblestone

Waupun Main

RCEC Center

Dam Heights

Bluff Creek

West Darien

East Beloit

Sugar Creek

Orfordville

Black Earth

King (king)

Lake Geneva

RCEC Newark

DPC Gratiot

Bloomington

Pardeeville

Manley Sand

Rock Branch

Air Liquide

Arthur Road

ACEC Roslin

Hamilton St

Mount Horeb

James Olson

Spring Brook

East Rockton

Butler Ridge

Williams Bay

Stoney Brook

RCEC Fulton

Yahara River

Sauk Prairie

Spring Green

DPC Stoneman

ACEC Calamus

Union Center

Spring Grove

Shirland Ave

Cross Plains

Milton Lawns

ACEC Chateau

Duplainville

ACEC Cambria

Neenah Creek

North Monroe

South Monroe

Rock Springs

West Mauston

Concord SW YD

Fort Atkinson

Mineral Point

North Madison

RCEC Bradford

Pioneer(ALTE)

Boscobel Muni

Cottage Grove

Cross Country

Business Park

ACEC Lewiston

Merrill Hills

Albany (ALTE)

Pleasant View

Bristol (ALTE)RCEC LaPrairie

Brodhead North

Wyoming Valley

North Randolph

Saunders Creek

ACEC Friesland

Monroe Central

Hilltop (ALTE)

Mercury Marine

Stoughton East

Blanchardville

New Hollandale

Clinton (ALTE)

Columbus South

Lyndon Station

DPC Shullsburg

ACEC Winnebago

Colloday Point

Brodhead South

Dorset Corners

University (WE)

DPC Platteville

Crawfish River

Badger Pump STA

Evansville Muni

Fox Lake (ALTE)

Centennial Park

Cottonwood (WE)

Columbus (ALTE)

Waunakee SW STA

Milwaukee Valve

Twin Lakes (WE)

Mcgregor (ALTE)

DPC Bell Center

ACEC Doylestown

Beaver Dam East

Columbus Muni 1

Stoughton South

Brodhead SW STA

Lakehead Delavan

North Beaver Dam

Brodhead Central

Lakehead Portage

Tower Substation

Northwest Beloit

Juneau Northside

Mackford Prairie

Caledonia (ALTE)

Horicon Ind Park

South Beaver Dam

Lakehead Waterloo

Beaver Dam 3rd St

Green Lake SW STA

New London (ALTW)

Pine River (ALTE)

South Lake Geneva

Monticello (ALTE)

Summit Lake (ALTW)

Nelson Dewey SW YD

DPC Lyndon Station

Jennings Rd SW STA

Stage Coach SW STA

Rio Pumping Station

Lodi Industrial Park

Mazomainie Industrial

North Madison 345/138

Forward Energy Center

Kettle Morraine (ALTE)

Lancaster Distribution

Wisconsin Dells Muni 2

Badger Ordinance Works

South Fond Du Lac SW YD

North East Mount Horeb Muni

Fitchburg

Delafield

Steuben

Janesville

Beloit

Pewaukee

Waukesha

Portage

West Bend

Elkhorn

Sun Prairie

Sussex

Delavan

Middleton

Watertown

Hartford

Twin Lakes

Waunakee

Monroe

Lake Delton

Wauzeka

Burlington

Beaver Dam

HartlandOconomowoc

Jefferson

Reedsburg

Bell Center

Slinger

Milton

Chenequa

Mauston

Whitewater

Horicon

Waterloo

Germantown

Gays Mills

Eastman

Platteville

Oregon

Stoughton

Viroqua

Wales

Prairie du Chien

Columbus

Mukwonago

Fort Atkinson

East Troy

Avoca

Merton

Lake Mills

Rio

Elroy

Mayville

Doylestown

Dodgeville

Westby

Lancaster

Poynette

Richland Center

Waupun

Potosi

Lomira

Boscobel

Ferryville

Waterford

Big Bend

Markesan

Soldiers Grove

Montello

Eagle

Jackson

Juneau

Dane

Mount Horeb

Mineral Point

Evansville

Pardeeville

North Prairie

Marshall

Genoa City

Arena

Albany

Nashotah

Clinton

Brodhead

Kingston

Cobb

Sauk City

Readstown

Fox Lake

Cottage Grove

La Crosse

Palmyra

Fall River

Johnson Creek

Lowell

Merrimac

Lynxville

Plain

Oxford

Wisconsin Dells

Sullivan Dousman

Ontario

Kewaskum

Hillsboro

Fennimore

Sharon

Lyndon Station

Cashton

Ridgeway

Belleville

DeerfieldHighland

New Glarus

Viola

La Farge

Benton

Bagley

Oakfield

Linden

Lone Rock

Monticello

Muscoda

Wonewoc

Shullsburg

Eden

Rock Springs

Darlington

Spring Green

Theresa

Hazel Green

Cross Plains

Cuba City

Cassville

De Soto

Kendall

Mount Sterling

Bloomington

Hustisford

Cazenovia

Brandon

Browntown

Argyle

Randolph

Lime Ridge

Coon Valley

Neosho

Gratiot

Campbellsport

Fairwater

Livingston

Dickeyville

Endeavor

Rewey

Boaz Arlington

Blue River

Belmont

Iron Ridge

Hollandale

Cambridge

Union Center

South Wayne

Brooklyn

Reeseville

North Freedom

Melvina

Chaseburg

Black Earth

Blue Mounds

Yuba

Rochester

Lac La Belle

La Valle

Ironton

Tennyson

Norwalk

Brownsville

Patch Grove

Clyman

Mount Hope

Kekoskee

Blanchardville

Woodman

Loganville

St. Cloud

D a n e

G r a n t

S a u k

I o w a

R o c k

D o d g e

V e r n o n

G r e e n

C o l u m b i a

L a f a y e t t e

R i c h l a n d

C r a w f o r d

W a l w o r t h

J e f f e r s o nW a u k e s h a

F o n d d u L a c

J u n e a uM o n r o e

W a s h i n g t o n

A d a m s M a r q u e t t eG r e e n L a k e

R a c i n e

L a C r o s s e

K e n o s h a

Fen OakPewa

Cottage Grove

11

3

5

5

ATC has completed 13 network projects in Zone 3 since the 2008 Assessment, most notably the North Madison-Huiskamp 138-kV line project and the Rock River-Bristol-Elkhorn conversion to 138-kV operation.

Keeping up with the rapidly increasing use of the transmission system in Zone 3 will require continued and close coordination with stakeholders. ATC’s current plans in Zone 3 include more than 45 system reliability and economic projects between 2009 and 2023 to address network issues identified. These projects are in various stages of development. The most notable planned, proposed, provisional and asset renewal projects in Zone 3, along with their projected years of completion and the factors driving the need for the projects, are listed below.

1

2

3

4

5

7

8

9

10

11

12

13

14

6

Project description in-service need driver year

Planned projects

Jefferson-Lake Mills-Stony Brook 2009 Addresses low voltages and overloaded facilities, 138-kV line accommodates T-D interconnection

Oak Ridge-Verona 138-kV line 2010 Improve area voltages and address overloads

Paddock-Rockdale 345-kV line 2010 Improves access to lower cost sources of power

Rockdale-West Middleton 345-kV line 2013 Addresses overloads and low voltages, improves transfer capability to Madison area, averts voltage collapse, lowers system losses

Proposed projects

Replace two overhead Blount-Ruskin 2011 Completion of earlier project per agreement 69-kV lines with one underground 69-kV line with the City of Madison

Verona-Oregon 69-kV line rebuild 2011 Improve area voltages and address overloads

Brodhead-South Monroe 69-kV line rebuild 2011 Improve area voltages and address overloads

Colley Road-Brick Church 69-kV line rebuild 2013 Address overloads and low voltages

Provisional projects

North Lake Geneva-South Lake Geneva 2016 Addresses potential overloads and low voltages, 138-kV line transmission to distribution interconnection

Lake Delton-Birchwood 138-kV line 2017 Addresses overloads and low-voltage issues in Reedsburg Loop

West Middleton-Blount 138-kV line 2017 Addresses overloads and low voltages

Spring Valley-Twin Lakes-South 2018 Addresses overloads and low voltages Lake Geneva 138-kV line

Horicon-East Beaver Dam 138-kV line 2019 Addresses potential overloads and low voltages

Asset renewal projects

Concord-Rubicon 138-kV line rebuild 2013 Improve condition and increase reliability performance of existing line

Transmission projects in Zone 3

South Central/Southwest wisconsin and north Central illinois – Zone 3DANE

SAUK COLUMBIA

LAFAYETTE GREEN ROCK WALWORTH

JEFFERSON

DODGE CRAWFORD

IOWA

GRANT

RICHLAND

WINNEBAGO, ILL

Page 7: An excerpt from ATC’s 2009 10-Year Transmission System ... · While the cost estimate in our 2009 Assessment is slightly less than the $2.7 billion identified in last year’s report,

1

2 46

78

9

10

12

13

14

T

T

T

C

C

C

C

C

C

T

T

T

T

T

T

SM

SM

SM

SM

SM

SM

SM

SM

SM

SM

SM

SM SM

SM

SMSM

T-D

C

CC

C

C

C

C

C

C

C

C

C

C

C

C

SM

SM

SM

SM

SM

SM

SM

SM

SM

SM

SM

SM

SM

SM

SM

SM

Eden

Okee

Alto

Elmo

Dane

Lodi

Troy

Tokay

LaMar

South

Syene

Arena

Eagle

Burke

Rewey

Miner

McCue

Zenda

Wiota

Zobel

Avoca

Cooney

Waupun

Viking

Kieler

Sharon

Auburn

Summit

Nishan

Seneca

Wilcox

London

Verona

Island

Benton

Barton

Sussex

TurtleMarine

Pflaum

Ruskin

Roeder

Oregon

Potosi

Elkhorn

Bird St

Rubicon

Traxler

Muscoda

Glacier

Macy St

TibbitsRussell

Sanborn

HubbardHoricon

Metomen

Cambria

Kegonsa

Trienda

Femrite

Mauston

Wonewoc

Sunrise

Venture

Portage

Baraboo

Forward

Delavan

Brandon

Wauzeka

Academy

Paddock

Hampden

Belmont

Hillman

Waukesha

Park Ave

Rockdale

Montello

Deforest

Finnegan

Boscobel

Oakfield

Cranston

Boxelder

Brooklyn

Kirkwood

Koch Oil

Poynette

Merrimac

Artesian

Tichigan

Ohmstead

Hartford

Walworth

American

Hillside

Mayville

Colorado

Huiskamp

Moore St

Brisbois

MarkesanEndeavor

Kilbourn

Edgewood

Randolph

Tripp Rd

Sprecher

Brodhead

Westport

Richland

Morris St

Rosendale

Dana Corp

Footville

Ledgeview

RCEC Shaw

Reiner Rd

Birchwood

DPC Elroy

Lancaster

La Pointe

Arlington

ACEC Glen

Lone Rock

Gran Grae

Cassville

Butternut

Sheepskin

Idle Hour

Browntown

Cuba City

Center St

Cambridge

Gaston Rd

Reedsburg

Hillsboro

Mukwonago

JeffersonMcFarland

Lands End

Sadoff Co

Stoughton

Mazomanie

Lafayette

Colley Rd

Fitchburg

Rock River

East Towne

Shullsburg

Hustisford

West Towne

Darlington

Hickory St

DPC LaMont

Blue River

Glen Haven

Burlington

Scot Forge

North Side

Eagle View

DPC Argyle

Fall River

Katzenberg

Dell Creek

Bark River

Christiana

Bass Creek

Blacksmith

Dodgeville

Gays Mills

Whitewater

Walnut GIS

Belleville

Timberlane

New Glarus

Loganville

BOC Grasses

Lake Delton

Loch Mirror

Hooterville

St Lawrence

Willow Lawn

Cobblestone

Waupun Main

RCEC Center

Dam Heights

Bluff Creek

West Darien

East Beloit

Sugar Creek

Orfordville

Black Earth

King (king)

Lake Geneva

RCEC Newark

DPC Gratiot

Bloomington

Pardeeville

Manley Sand

Rock Branch

Air Liquide

Arthur Road

ACEC Roslin

Hamilton St

Mount Horeb

James Olson

Spring Brook

East Rockton

Butler Ridge

Williams Bay

Stoney Brook

RCEC Fulton

Yahara River

Sauk Prairie

Spring Green

DPC Stoneman

ACEC Calamus

Union Center

Spring Grove

Shirland Ave

Cross Plains

Milton Lawns

ACEC Chateau

Duplainville

ACEC Cambria

Neenah Creek

North Monroe

South Monroe

Rock Springs

West Mauston

Concord SW YD

Fort Atkinson

Mineral Point

North Madison

RCEC Bradford

Pioneer(ALTE)

Boscobel Muni

Cottage Grove

Cross Country

Business Park

ACEC Lewiston

Merrill Hills

Albany (ALTE)

Pleasant View

Bristol (ALTE)RCEC LaPrairie

Brodhead North

Wyoming Valley

North Randolph

Saunders Creek

ACEC Friesland

Monroe Central

Hilltop (ALTE)

Mercury Marine

Stoughton East

Blanchardville

New Hollandale

Clinton (ALTE)

Columbus South

Lyndon Station

DPC Shullsburg

ACEC Winnebago

Colloday Point

Brodhead South

Dorset Corners

University (WE)

DPC Platteville

Crawfish River

Badger Pump STA

Evansville Muni

Fox Lake (ALTE)

Centennial Park

Cottonwood (WE)

Columbus (ALTE)

Waunakee SW STA

Milwaukee Valve

Twin Lakes (WE)

Mcgregor (ALTE)

DPC Bell Center

ACEC Doylestown

Beaver Dam East

Columbus Muni 1

Stoughton South

Brodhead SW STA

Lakehead Delavan

North Beaver Dam

Brodhead Central

Lakehead Portage

Tower Substation

Northwest Beloit

Juneau Northside

Mackford Prairie

Caledonia (ALTE)

Horicon Ind Park

South Beaver Dam

Lakehead Waterloo

Beaver Dam 3rd St

Green Lake SW STA

New London (ALTW)

Pine River (ALTE)

South Lake Geneva

Monticello (ALTE)

Summit Lake (ALTW)

Nelson Dewey SW YD

DPC Lyndon Station

Jennings Rd SW STA

Stage Coach SW STA

Rio Pumping Station

Lodi Industrial Park

Mazomainie Industrial

North Madison 345/138

Forward Energy Center

Kettle Morraine (ALTE)

Lancaster Distribution

Wisconsin Dells Muni 2

Badger Ordinance Works

South Fond Du Lac SW YD

North East Mount Horeb Muni

Fitchburg

Delafield

Steuben

Janesville

Beloit

Pewaukee

Waukesha

Portage

West Bend

Elkhorn

Sun Prairie

Sussex

Delavan

Middleton

Watertown

Hartford

Twin Lakes

Waunakee

Monroe

Lake Delton

Wauzeka

Burlington

Beaver Dam

HartlandOconomowoc

Jefferson

Reedsburg

Bell Center

Slinger

Milton

Chenequa

Mauston

Whitewater

Horicon

Waterloo

Germantown

Gays Mills

Eastman

Platteville

Oregon

Stoughton

Viroqua

Wales

Prairie du Chien

Columbus

Mukwonago

Fort Atkinson

East Troy

Avoca

Merton

Lake Mills

Rio

Elroy

Mayville

Doylestown

Dodgeville

Westby

Lancaster

Poynette

Richland Center

Waupun

Potosi

Lomira

Boscobel

Ferryville

Waterford

Big Bend

Markesan

Soldiers Grove

Montello

Eagle

Jackson

Juneau

Dane

Mount Horeb

Mineral Point

Evansville

Pardeeville

North Prairie

Marshall

Genoa City

Arena

Albany

Nashotah

Clinton

Brodhead

Kingston

Cobb

Sauk City

Readstown

Fox Lake

Cottage Grove

La Crosse

Palmyra

Fall River

Johnson Creek

Lowell

Merrimac

Lynxville

Plain

Oxford

Wisconsin Dells

Sullivan Dousman

Ontario

Kewaskum

Hillsboro

Fennimore

Sharon

Lyndon Station

Cashton

Ridgeway

Belleville

DeerfieldHighland

New Glarus

Viola

La Farge

Benton

Bagley

Oakfield

Linden

Lone Rock

Monticello

Muscoda

Wonewoc

Shullsburg

Eden

Rock Springs

Darlington

Spring Green

Theresa

Hazel Green

Cross Plains

Cuba City

Cassville

De Soto

Kendall

Mount Sterling

Bloomington

Hustisford

Cazenovia

Brandon

Browntown

Argyle

Randolph

Lime Ridge

Coon Valley

Neosho

Gratiot

Campbellsport

Fairwater

Livingston

Dickeyville

Endeavor

Rewey

Boaz Arlington

Blue River

Belmont

Iron Ridge

Hollandale

Cambridge

Union Center

South Wayne

Brooklyn

Reeseville

North Freedom

Melvina

Chaseburg

Black Earth

Blue Mounds

Yuba

Rochester

Lac La Belle

La Valle

Ironton

Tennyson

Norwalk

Brownsville

Patch Grove

Clyman

Mount Hope

Kekoskee

Blanchardville

Woodman

Loganville

St. Cloud

D a n e

G r a n t

S a u k

I o w a

R o c k

D o d g e

V e r n o n

G r e e n

C o l u m b i a

L a f a y e t t e

R i c h l a n d

C r a w f o r d

W a l w o r t h

J e f f e r s o nW a u k e s h a

F o n d d u L a c

J u n e a uM o n r o e

W a s h i n g t o n

A d a m s M a r q u e t t eG r e e n L a k e

R a c i n e

L a C r o s s e

K e n o s h a

Fen OakPewa

Cottage Grove

11

3

5

System Solutions

New substationSupports transmission system expansion

Substation modificationsUpgrades equipment ratings to avert facility overloads

TransformerSupports local growth and improves voltage levels

345-kV transmission line

115-, 138- or 161-kV transmission line

Rebuilt 115- or 138-kV transmission line

Transmission line voltage conversion

69-kV transmission line

Rebuilt 69-kV transmission line

Capacitor bankRelieves low voltages

T-D interconnectionSupports local growth

SUBSTATION KEY TRANSMISSION LINE KEY

6

Page 8: An excerpt from ATC’s 2009 10-Year Transmission System ... · While the cost estimate in our 2009 Assessment is slightly less than the $2.7 billion identified in last year’s report,

ATC AT A gLAnCen Formed in 2001 as the first multi-state, transmission-only utility.

n Owner and operator of approximately 9,400 miles of transmission line and 510 substations.

n Meeting electric needs of more than five million people in 72 counties in four states: Wisconsin, Michigan, Minnesota and Illinois.

n $2.5 billion in total assets.

ConTACT mail P.O. Box 47 Waukesha, WI 53187-0047

Toll-free 1-866-899-3204

web [email protected]

More detailed information is available at www.atc10yearplan.com

P.O. Box 47Waukesha, WI 53187-0047

P.O. Box 47 n Waukesha, WI 53187-0047 n Toll-free 866.899.3204 n 262.506.6700 n www.atcllc.com

would you like a speaker from ATC to address your group? give us a call, toll-free, at 1.866.899.3204, ext. 6922.

Helping to keep the lights on, businesses running and communities strong™