An Equal Opportunity Employer - IN.gov · 2018. 10. 29. · US 31 Replace Superstructure 1.94 miles S of SR 160 over Caney Fork 40997 / A 31 Seymour 0 STP $908,046.00 Bridge Consulting

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: An Equal Opportunity Employer - IN.gov · 2018. 10. 29. · US 31 Replace Superstructure 1.94 miles S of SR 160 over Caney Fork 40997 / A 31 Seymour 0 STP $908,046.00 Bridge Consulting
Page 2: An Equal Opportunity Employer - IN.gov · 2018. 10. 29. · US 31 Replace Superstructure 1.94 miles S of SR 160 over Caney Fork 40997 / A 31 Seymour 0 STP $908,046.00 Bridge Consulting

www.in.gov/dot/ An Equal Opportunity Employer

100 North Senate Avenue Room N955 Indianapolis, Indiana 46204

PHONE: (317) 232-0223 FAX: (317) 232-1499 Eric Holcomb, Governor

Joe McGuinness, Commissioner

October 29, 2018 Ms. Mayela Sosa, Division Administrator FHWA Indiana Division 575 North Pennsylvania Street, Room 254 Indianapolis, Indiana 46204 Dear Ms. Sosa: The Indiana Department of Transportation requests the projects listed in STIP Amendment 18-31 to be incorporated into the 2018-2021 Statewide Transportation Improvement Program (STIP). The required Metropolitan Planning Organization (MPO) Transportation Improvement Program (TIP) documents have been included in this request and duly noted in the Amendment. We have determined that the proposed amendments are: 1) consistent with the transportation plan; 2) the TIP remains fiscally constrained in that federal funding resources are sufficient to support the new or modified projects; and 3) conform to state and national air quality standards. A draft of this amendment was posted on INDOT’s STIP website http://www.in.gov/indot/STIP for comments. No comments were given about any project listed. We request your review and approval of the subject amendment. Should you have any questions pertaining to this amendment, please contact Michael McNeil, STIP Specialist at (317) 232-0223 or at [email protected]. Sincerely,

Roy Nunnally, Director Asset Planning & Management Division

Page 3: An Equal Opportunity Employer - IN.gov · 2018. 10. 29. · US 31 Replace Superstructure 1.94 miles S of SR 160 over Caney Fork 40997 / A 31 Seymour 0 STP $908,046.00 Bridge Consulting

State Preservation and Local Initiated Projects FY 2018 - 2021

Indiana Department of Transportation (INDOT)

SPONSOR CONTR

ACT # /

LEAD

DES

ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL

CATEGORY

PROGRAM PHASE FEDERAL MATCHEstimated

Cost left to

Complete

Project*

2018 2019 2020 2021STIP

NAME

Allen County

Indiana Department

of Transportation

SR 37 New Signal

Installation

0.27 miles north of I-469 at St.

Joe Center Road/ Irving Road.

Fort Wayne 0 STPBG District Other

Construction

CN $77,422.40 $19,355.60 $96,778.00A 31 $96,778.0040815 /

1702734

Comments:NIRCC Res 18-135. DES 1702734 Adding CN to FY 2019 into FY 2018 - 2021 STIP.

Allen County Total

Federal: $77,422.40 Match :$19,355.60 2018: 2019: $96,778.00 2020: 2021:

*Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not fiscally constrained and is for information purposes.

Page 1 of 37 Report Created:11/2/2018 2:09:58PM

Page 4: An Equal Opportunity Employer - IN.gov · 2018. 10. 29. · US 31 Replace Superstructure 1.94 miles S of SR 160 over Caney Fork 40997 / A 31 Seymour 0 STP $908,046.00 Bridge Consulting

State Preservation and Local Initiated Projects FY 2018 - 2021

Indiana Department of Transportation (INDOT)

SPONSOR CONTR

ACT # /

LEAD

DES

ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL

CATEGORY

PROGRAM PHASE FEDERAL MATCHEstimated

Cost left to

Complete

Project*

2018 2019 2020 2021STIP

NAME

Bartholomew County

Columbus MS 1 Railroad Protection Railroad crossings between

SR 46 and 11th Street

Seymour 0 STPBG Columbus MPO CN $0.00 $0.00 $0.00A 31 $0.0040372 /

1701327

100% Local

Funds

CN $0.00 $0.00 $0.00

Comments:Funding removed, project is now 100% Local. No MPO.

Bartholomew County Total

Federal: $0.00 Match :$0.00 2018: 2019: $0.00 2020: 2021:

*Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not fiscally constrained and is for information purposes.

Page 2 of 37 Report Created:11/2/2018 2:09:58PM

Page 5: An Equal Opportunity Employer - IN.gov · 2018. 10. 29. · US 31 Replace Superstructure 1.94 miles S of SR 160 over Caney Fork 40997 / A 31 Seymour 0 STP $908,046.00 Bridge Consulting

State Preservation and Local Initiated Projects FY 2018 - 2021

Indiana Department of Transportation (INDOT)

SPONSOR CONTR

ACT # /

LEAD

DES

ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL

CATEGORY

PROGRAM PHASE FEDERAL MATCHEstimated

Cost left to

Complete

Project*

2018 2019 2020 2021STIP

NAME

Benton County

Indiana Department

of Transportation

US 52 HMA Overlay Minor

Structural

From 0.41 mi W of SR 18 (E jct)

to 0.10 mi E of SR 352

Crawfordsville 8.398 STPBG Road ROW RW $64,000.00 $16,000.00 $80,000.00A 31 $12,846,405.2040582 /

1700104

Comments:No MPO; Add FY19 ROW $80,000

Benton County Total

Federal: $64,000.00 Match :$16,000.00 2018: 2019: $80,000.00 2020: 2021:

*Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not fiscally constrained and is for information purposes.

Page 3 of 37 Report Created:11/2/2018 2:09:58PM

Page 6: An Equal Opportunity Employer - IN.gov · 2018. 10. 29. · US 31 Replace Superstructure 1.94 miles S of SR 160 over Caney Fork 40997 / A 31 Seymour 0 STP $908,046.00 Bridge Consulting

State Preservation and Local Initiated Projects FY 2018 - 2021

Indiana Department of Transportation (INDOT)

SPONSOR CONTR

ACT # /

LEAD

DES

ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL

CATEGORY

PROGRAM PHASE FEDERAL MATCHEstimated

Cost left to

Complete

Project*

2018 2019 2020 2021STIP

NAME

Boone County

Indiana Department

of Transportation

I 65 Bridge Deck Overlay Closing Out - 0.20 mi N of US

52, NBL over Prairie Creek

Crawfordsville 0 NHPP Bridge

Construction

CN -$1,078,200.00 -$119,800.00 ($1,198,000.00)A 31 $0.001296049

Comments:No MPO, removed FY19 CN. Project closing out.

Indiana Department

of Transportation

I 65 Bridge Deck Overlay Eliminating - 0.20 mi N of US 52,

SBL over Prairie Creek

Crawfordsville 0 NHPP Bridge

Construction

CN -$1,125,900.00 -$125,100.00 ($1,251,000.00)A 31 $0.001296050

Comments:No MPO; remove FY19 CN funds. Eliminating project

Lebanon ST 1034 Road Reconstruction

(3R/4R Standards)

Grant Street from Washington

St. to Fordice Rd.

Crawfordsville .448 STPBG 100% Local

Funds

PE $0.00 $108,599.00 $108,599.00A 31 $4,100,000.0040877 /

1800237

Group III Program PE $434,396.00 $0.00 $434,396.00

Comments:NO MPO, please add PE funds in FY 19 in the amount of 434,396 federal and 108,599 local

Boone County Total

Federal: -$1,769,704.00 Match :-$136,301.00 2018: 2019: -$1,906,005.00 2020: 2021:

*Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not fiscally constrained and is for information purposes.

Page 4 of 37 Report Created:11/2/2018 2:09:58PM

Page 7: An Equal Opportunity Employer - IN.gov · 2018. 10. 29. · US 31 Replace Superstructure 1.94 miles S of SR 160 over Caney Fork 40997 / A 31 Seymour 0 STP $908,046.00 Bridge Consulting

State Preservation and Local Initiated Projects FY 2018 - 2021

Indiana Department of Transportation (INDOT)

SPONSOR CONTR

ACT # /

LEAD

DES

ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL

CATEGORY

PROGRAM PHASE FEDERAL MATCHEstimated

Cost left to

Complete

Project*

2018 2019 2020 2021STIP

NAME

Carroll County

Indiana Department

of Transportation

SR 75 Replace

Superstructure

Sr [email protected] Run, 01.17mi

N of SR 18

LaPorte 0 STP Bridge Consulting PE $43,200.00 $10,800.00 $54,000.00A 31 $665,281.001703044

Comments:Amend FY19 PE Phase into the current STIP. No MPO

Carroll County Total

Federal: $43,200.00 Match :$10,800.00 2018: 2019: $54,000.00 2020: 2021:

*Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not fiscally constrained and is for information purposes.

Page 5 of 37 Report Created:11/2/2018 2:09:58PM

Page 8: An Equal Opportunity Employer - IN.gov · 2018. 10. 29. · US 31 Replace Superstructure 1.94 miles S of SR 160 over Caney Fork 40997 / A 31 Seymour 0 STP $908,046.00 Bridge Consulting

State Preservation and Local Initiated Projects FY 2018 - 2021

Indiana Department of Transportation (INDOT)

SPONSOR CONTR

ACT # /

LEAD

DES

ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL

CATEGORY

PROGRAM PHASE FEDERAL MATCHEstimated

Cost left to

Complete

Project*

2018 2019 2020 2021STIP

NAME

Clark County

Indiana Department

of Transportation

US 31 Replace

Superstructure

1.94 miles S of SR 160 over

Caney Fork

Seymour 0 STP Bridge Consulting PE $144,000.00 $36,000.00 $180,000.00A 31 $908,046.0040997 /

1593192

Bridge

Construction

CN $582,436.80 $145,609.20 $728,046.00

Comments:Amend PE and CN to the current STIP. Amended to KIPDA's TIP per Administrative Modification 21 dated 9/27/18.

Clarksville ST 1046 Traffic Signals

Modernization

Eastern Boulevard from Lewis

and Clark Parkway to Brooks

Avenue

Seymour 1.04 NHPP Louisville MPO CN $77,080.00 $0.00 $77,080.00A 31 $85,644.0041379 /

1801599

100% Local

Funds

CN $0.00 $8,564.00 $8,564.00

Comments:Adding funding to FY 2019 CN. KIPDA FY 2018-2021 TIP Amendment #1 dated March 22, 2018.

Clark County Total

Federal: $803,516.80 Match :$190,173.20 2018: 2019: $265,644.00 2020: 2021: $728,046.00

*Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not fiscally constrained and is for information purposes.

Page 6 of 37 Report Created:11/2/2018 2:09:58PM

Page 9: An Equal Opportunity Employer - IN.gov · 2018. 10. 29. · US 31 Replace Superstructure 1.94 miles S of SR 160 over Caney Fork 40997 / A 31 Seymour 0 STP $908,046.00 Bridge Consulting

State Preservation and Local Initiated Projects FY 2018 - 2021

Indiana Department of Transportation (INDOT)

SPONSOR CONTR

ACT # /

LEAD

DES

ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL

CATEGORY

PROGRAM PHASE FEDERAL MATCHEstimated

Cost left to

Complete

Project*

2018 2019 2020 2021STIP

NAME

Clay County

Indiana Department

of Transportation

SR 59 Debris Removal From

Channel

over Eel River; 04.65 mi S of

SR 246

Crawfordsville 0 STPBG Bridge Consulting PE $43,200.00 $10,800.00 $54,000.00A 31 $375,280.0041400 /

1801305

Bridge

Construction

CN $191,771.20 $47,942.80 $239,714.00

Comments:IMPO - 18-IMPO-016 (DES 1801336); add FY19 PE $54.000, add FY20 CN $239,714

Clay County Total

Federal: $234,971.20 Match :$58,742.80 2018: 2019: $54,000.00 2020: $239,714.00 2021:

*Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not fiscally constrained and is for information purposes.

Page 7 of 37 Report Created:11/2/2018 2:09:58PM

Page 10: An Equal Opportunity Employer - IN.gov · 2018. 10. 29. · US 31 Replace Superstructure 1.94 miles S of SR 160 over Caney Fork 40997 / A 31 Seymour 0 STP $908,046.00 Bridge Consulting

State Preservation and Local Initiated Projects FY 2018 - 2021

Indiana Department of Transportation (INDOT)

SPONSOR CONTR

ACT # /

LEAD

DES

ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL

CATEGORY

PROGRAM PHASE FEDERAL MATCHEstimated

Cost left to

Complete

Project*

2018 2019 2020 2021STIP

NAME

Clinton County

Indiana Department

of Transportation

I 65 Bridge Deck Overlay Eliminating - SBL, over Brush

Creek. 4.89 mi N of SR 47

Crawfordsville 0 NHPP Bridge

Construction

CN -$1,140,300.00 -$126,700.00 ($1,267,000.00)A 31 $0.001296133

Comments:No MPO; removed FY19 CN funds

Frankfort ST 1016 Road Reconstruction

(3R/4R Standards)

Washington Ave. from

Washington St. to Williams St.,

Frankfort, Indiana

Crawfordsville .4 STPBG 100% Local

Funds

CN $0.00 $661,000.00 $661,000.00 A 31 $3,200,000.0041085 /

1800236

Group III Program CN $2,644,000.00 $0.00 $2,644,000.00

Comments:NO MPO, please add FY 2020 funds for CN in the amount of 2,644,000 federal and 661,000 federal

Clinton County Total

Federal: $1,503,700.00 Match :$534,300.00 2018: 2019: -$1,267,000.00 2020: $3,305,000.00 2021:

*Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not fiscally constrained and is for information purposes.

Page 8 of 37 Report Created:11/2/2018 2:09:58PM

Page 11: An Equal Opportunity Employer - IN.gov · 2018. 10. 29. · US 31 Replace Superstructure 1.94 miles S of SR 160 over Caney Fork 40997 / A 31 Seymour 0 STP $908,046.00 Bridge Consulting

State Preservation and Local Initiated Projects FY 2018 - 2021

Indiana Department of Transportation (INDOT)

SPONSOR CONTR

ACT # /

LEAD

DES

ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL

CATEGORY

PROGRAM PHASE FEDERAL MATCHEstimated

Cost left to

Complete

Project*

2018 2019 2020 2021STIP

NAME

Dearborn County

Dearborn County IR 1026 Slide Correction Lower Dillsboro Rd, 2800 ft

west of Gatch Hill Rd to 1500 ft

west of Gatch Hill

Seymour .25 STPBG Group IV Program PE $274,400.00 $0.00 $274,400.00A 31 $2,124,400.0040889 /

1702959

100% Local

Funds

PE $0.00 $54,880.00 $54,880.00

Comments:Adding PE funds for FY 2018. NO MPO

Dearborn County Total

Federal: $274,400.00 Match :$54,880.00 2018: 2019: $329,280.00 2020: 2021:

*Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not fiscally constrained and is for information purposes.

Page 9 of 37 Report Created:11/2/2018 2:09:58PM

Page 12: An Equal Opportunity Employer - IN.gov · 2018. 10. 29. · US 31 Replace Superstructure 1.94 miles S of SR 160 over Caney Fork 40997 / A 31 Seymour 0 STP $908,046.00 Bridge Consulting

State Preservation and Local Initiated Projects FY 2018 - 2021

Indiana Department of Transportation (INDOT)

SPONSOR CONTR

ACT # /

LEAD

DES

ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL

CATEGORY

PROGRAM PHASE FEDERAL MATCHEstimated

Cost left to

Complete

Project*

2018 2019 2020 2021STIP

NAME

Decatur County

Indiana Department

of Transportation

I 74 ITS Traffic

Management Systems

CCTV Cameras/Detection from

US 421 to US 52

Seymour 37.131 Interstate Statewide

Consulting

PE $72,000.00 $8,000.00 $80,000.00A 31 $955,000.0041272 /

1801416

Statewide

Construction

CN $787,500.00 $87,500.00 $875,000.00

Comments:Amend FY 19 PE phase and FY 20 CN phase into the current STIP. No MPO.

Decatur County Total

Federal: $859,500.00 Match :$95,500.00 2018: 2019: $80,000.00 2020: $875,000.00 2021:

*Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not fiscally constrained and is for information purposes.

Page 10 of 37 Report Created:11/2/2018 2:09:58PM

Page 13: An Equal Opportunity Employer - IN.gov · 2018. 10. 29. · US 31 Replace Superstructure 1.94 miles S of SR 160 over Caney Fork 40997 / A 31 Seymour 0 STP $908,046.00 Bridge Consulting

State Preservation and Local Initiated Projects FY 2018 - 2021

Indiana Department of Transportation (INDOT)

SPONSOR CONTR

ACT # /

LEAD

DES

ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL

CATEGORY

PROGRAM PHASE FEDERAL MATCHEstimated

Cost left to

Complete

Project*

2018 2019 2020 2021STIP

NAME

Elkhart County

Indiana Department

of Transportation

SR 19 Replace

Superstructure

Over Christiana Creek, 2.43

Miles South of I-90.

Fort Wayne .3 NHPP Bridge Consulting PE $396,000.00 $99,000.00 $495,000.00A 31 $4,450,316.0041562 /

1800057

Comments:MACOG Resolution 25-18. DES 1800057 Adding PE to FY 2019 into FY 2018 - 2021 STIP.

Elkhart County Total

Federal: $396,000.00 Match :$99,000.00 2018: 2019: $495,000.00 2020: 2021:

*Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not fiscally constrained and is for information purposes.

Page 11 of 37 Report Created:11/2/2018 2:09:58PM

Page 14: An Equal Opportunity Employer - IN.gov · 2018. 10. 29. · US 31 Replace Superstructure 1.94 miles S of SR 160 over Caney Fork 40997 / A 31 Seymour 0 STP $908,046.00 Bridge Consulting

State Preservation and Local Initiated Projects FY 2018 - 2021

Indiana Department of Transportation (INDOT)

SPONSOR CONTR

ACT # /

LEAD

DES

ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL

CATEGORY

PROGRAM PHASE FEDERAL MATCHEstimated

Cost left to

Complete

Project*

2018 2019 2020 2021STIP

NAME

Fayette County

Indiana Department

of Transportation

SR 121 HMA Overlay,

Preventive

Maintenance

From US 52 to SR 44 Greenfield 15.293 STP Road Consulting PE $180,000.00 $45,000.00 $225,000.00A 31 $3,011,339.0041091 /

1800747

Road

Construction

CN $2,229,071.20 $557,267.80 $2,786,339.00

Comments:New Road project

Fayette County Total

Federal: $2,409,071.20 Match :$602,267.80 2018: 2019: $225,000.00 2020: 2021: $2,786,339.00

*Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not fiscally constrained and is for information purposes.

Page 12 of 37 Report Created:11/2/2018 2:09:58PM

Page 15: An Equal Opportunity Employer - IN.gov · 2018. 10. 29. · US 31 Replace Superstructure 1.94 miles S of SR 160 over Caney Fork 40997 / A 31 Seymour 0 STP $908,046.00 Bridge Consulting

State Preservation and Local Initiated Projects FY 2018 - 2021

Indiana Department of Transportation (INDOT)

SPONSOR CONTR

ACT # /

LEAD

DES

ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL

CATEGORY

PROGRAM PHASE FEDERAL MATCHEstimated

Cost left to

Complete

Project*

2018 2019 2020 2021STIP

NAME

Fountain County

Indiana Department

of Transportation

US 41 Bridge Thin Deck

Overlay

Eliminating - Bridge over Irish

Run Creek, 1.27 mi S of US 136

Crawfordsville 0 STPBG Bridge

Construction

CN -$65,600.00 -$16,400.00 ($82,000.00) A 31 $0.001602072

Comments:No MPO; removed FY20 $82,000. Eliminating DES

Fountain County Total

Federal: -$65,600.00 Match :-$16,400.00 2018: 2019: 2020: -$82,000.00 2021:

*Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not fiscally constrained and is for information purposes.

Page 13 of 37 Report Created:11/2/2018 2:09:58PM

Page 16: An Equal Opportunity Employer - IN.gov · 2018. 10. 29. · US 31 Replace Superstructure 1.94 miles S of SR 160 over Caney Fork 40997 / A 31 Seymour 0 STP $908,046.00 Bridge Consulting

State Preservation and Local Initiated Projects FY 2018 - 2021

Indiana Department of Transportation (INDOT)

SPONSOR CONTR

ACT # /

LEAD

DES

ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL

CATEGORY

PROGRAM PHASE FEDERAL MATCHEstimated

Cost left to

Complete

Project*

2018 2019 2020 2021STIP

NAME

Fulton County

Indiana Department

of Transportation

SR 25 Replace

Superstructure

Sr [email protected] Creek, 01.04mi

E SR 331

LaPorte 0 STP Bridge Consulting PE $44,000.00 $11,000.00 $55,000.00A 31 $679,970.001703040

Comments:Amend FY19 PE Phase into the current STIP. No MPO

Fulton County Total

Federal: $44,000.00 Match :$11,000.00 2018: 2019: $55,000.00 2020: 2021:

*Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not fiscally constrained and is for information purposes.

Page 14 of 37 Report Created:11/2/2018 2:09:58PM

Page 17: An Equal Opportunity Employer - IN.gov · 2018. 10. 29. · US 31 Replace Superstructure 1.94 miles S of SR 160 over Caney Fork 40997 / A 31 Seymour 0 STP $908,046.00 Bridge Consulting

State Preservation and Local Initiated Projects FY 2018 - 2021

Indiana Department of Transportation (INDOT)

SPONSOR CONTR

ACT # /

LEAD

DES

ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL

CATEGORY

PROGRAM PHASE FEDERAL MATCHEstimated

Cost left to

Complete

Project*

2018 2019 2020 2021STIP

NAME

Hendricks County

Indiana Department

of Transportation

SR 75 Drainage Ditch

Correction

0.26 miles S to 0.16 miles S of

US 36

Crawfordsville 0 STPBG District Other

Consulting

PE $80,000.00 $20,000.00 $100,000.00A 31 $323,000.0041658 /

1801829

District Other

Construction

CN $178,400.00 $44,600.00 $223,000.00

Comments:No MPO; add FY19 PE $100,000, add FY20 CN $223,000

Hendricks County Total

Federal: $258,400.00 Match :$64,600.00 2018: 2019: $100,000.00 2020: $223,000.00 2021:

*Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not fiscally constrained and is for information purposes.

Page 15 of 37 Report Created:11/2/2018 2:09:58PM

Page 18: An Equal Opportunity Employer - IN.gov · 2018. 10. 29. · US 31 Replace Superstructure 1.94 miles S of SR 160 over Caney Fork 40997 / A 31 Seymour 0 STP $908,046.00 Bridge Consulting

State Preservation and Local Initiated Projects FY 2018 - 2021

Indiana Department of Transportation (INDOT)

SPONSOR CONTR

ACT # /

LEAD

DES

ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL

CATEGORY

PROGRAM PHASE FEDERAL MATCHEstimated

Cost left to

Complete

Project*

2018 2019 2020 2021STIP

NAME

Henry County

Indiana Department

of Transportation

SR 3 Concrete Pavement

Restoration (CPR)

from SR 38 to 2.55 Mi. N of SR

38

Greenfield 2.549 NHPP Road

Construction

CN $3,564,294.40 $891,073.60 $4,455,368.00 A 31 $4,455,368.0041087 /

1800759

Comments:CPR project.

Indiana Department

of Transportation

SR 103 HMA Overlay,

Preventive

Maintenance

from 2.21 miles S. of SR 38(SC

L New Castle) to SR 38

Greenfield 2.213 NHPP Road Consulting PE $73,600.00 $18,400.00 $92,000.00A 31 $1,003,981.0041096 /

1800744

Road

Construction

CN $729,584.80 $182,396.20 $911,981.00

Comments:Road Resurfacing

Henry County Total

Federal: $4,367,479.20 Match :$1,091,869.80 2018: 2019: $92,000.00 2020: 2021: $5,367,349.00

*Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not fiscally constrained and is for information purposes.

Page 16 of 37 Report Created:11/2/2018 2:09:58PM

Page 19: An Equal Opportunity Employer - IN.gov · 2018. 10. 29. · US 31 Replace Superstructure 1.94 miles S of SR 160 over Caney Fork 40997 / A 31 Seymour 0 STP $908,046.00 Bridge Consulting

State Preservation and Local Initiated Projects FY 2018 - 2021

Indiana Department of Transportation (INDOT)

SPONSOR CONTR

ACT # /

LEAD

DES

ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL

CATEGORY

PROGRAM PHASE FEDERAL MATCHEstimated

Cost left to

Complete

Project*

2018 2019 2020 2021STIP

NAME

Jasper County

Indiana Department

of Transportation

US 231 HMA Overlay,

Preventive

Maintenance

1.44mi N of SR 114 (CR 400S/

Wood Rd) to SR 14

LaPorte 4.559 NHPP Road Consulting PE $70,400.00 $17,600.00 $88,000.00A 31 $1,098,020.001800934

Comments:Amend FY19 PE Phase into the current STIP. No MPO

Indiana Department

of Transportation

SR 114 HMA Overlay,

Preventive

Maintenance

From I-65 to Iroquois River

Bridge

LaPorte 5.089 STP Road ROW RW $80,000.00 $20,000.00 $100,000.00A 31 $2,019,526.0040086 /

1593254

Comments:Amend FY19 ROW Phase into the current STIP. No MPO

Indiana Department

of Transportation

I 65 ITS Traffic

Management Systems

CCTV/DMS from US 24/231 (Exi

t 201) to SR 10

LaPorte 28.464 Interstate Statewide

Construction

CN $2,890,360.80 $321,151.20 $3,211,512.00 A 31 $3,511,512.0041233 /

1800573

Statewide

Consulting

PE $270,000.00 $30,000.00 $300,000.00

Comments:Amend FY 19 PE phase and FY 20 CN phase into the current STIP. No MPO.

Jasper County Total

Federal: $3,310,760.80 Match :$388,751.20 2018: 2019: $488,000.00 2020: $3,211,512.00 2021:

*Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not fiscally constrained and is for information purposes.

Page 17 of 37 Report Created:11/2/2018 2:09:58PM

Page 20: An Equal Opportunity Employer - IN.gov · 2018. 10. 29. · US 31 Replace Superstructure 1.94 miles S of SR 160 over Caney Fork 40997 / A 31 Seymour 0 STP $908,046.00 Bridge Consulting

State Preservation and Local Initiated Projects FY 2018 - 2021

Indiana Department of Transportation (INDOT)

SPONSOR CONTR

ACT # /

LEAD

DES

ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL

CATEGORY

PROGRAM PHASE FEDERAL MATCHEstimated

Cost left to

Complete

Project*

2018 2019 2020 2021STIP

NAME

Jennings County

North Vernon ST 1015 Road Rehabilitation (3

R/4R Standards)

Walnut Street (US 50) from 7th

Street to West Poplar Street

Seymour .379 STPBG 100% Local

Funds

PE $0.00 $178,669.06 $178,669.06A 31 $9,551,345.2840896 /

1702963

Group III Program PE $714,676.22 $0.00 $714,676.22

Comments:Adding PE to FY 2019. No MPO

Jennings County Total

Federal: $714,676.22 Match :$178,669.06 2018: 2019: $893,345.28 2020: 2021:

*Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not fiscally constrained and is for information purposes.

Page 18 of 37 Report Created:11/2/2018 2:09:58PM

Page 21: An Equal Opportunity Employer - IN.gov · 2018. 10. 29. · US 31 Replace Superstructure 1.94 miles S of SR 160 over Caney Fork 40997 / A 31 Seymour 0 STP $908,046.00 Bridge Consulting

State Preservation and Local Initiated Projects FY 2018 - 2021

Indiana Department of Transportation (INDOT)

SPONSOR CONTR

ACT # /

LEAD

DES

ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL

CATEGORY

PROGRAM PHASE FEDERAL MATCHEstimated

Cost left to

Complete

Project*

2018 2019 2020 2021STIP

NAME

Kosciusko County

Indiana Department

of Transportation

SR 13 Small Structure

Replacement

Carries Tennant Ditch, 5.67

Miles North of SR 14.

Fort Wayne 1.006 STPBG Bridge Consulting PE $328,000.00 $82,000.00 $410,000.00A 31 $2,787,466.0041552 /

1800015

Comments:MACOG Resolution 25-18. DES 1800015, 1800048, 1800184 Adding PE to FY 2019 into FY 2018 - 2021 STIP.

Kosciusko County Total

Federal: $328,000.00 Match :$82,000.00 2018: 2019: $410,000.00 2020: 2021:

*Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not fiscally constrained and is for information purposes.

Page 19 of 37 Report Created:11/2/2018 2:09:58PM

Page 22: An Equal Opportunity Employer - IN.gov · 2018. 10. 29. · US 31 Replace Superstructure 1.94 miles S of SR 160 over Caney Fork 40997 / A 31 Seymour 0 STP $908,046.00 Bridge Consulting

State Preservation and Local Initiated Projects FY 2018 - 2021

Indiana Department of Transportation (INDOT)

SPONSOR CONTR

ACT # /

LEAD

DES

ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL

CATEGORY

PROGRAM PHASE FEDERAL MATCHEstimated

Cost left to

Complete

Project*

2018 2019 2020 2021STIP

NAME

Lake County

Gary ST 1001 Road Reconstruction

(3R/4R Standards)

Ridge Road Reconstruction,

Connecticut St to Mississippi St

. Phase 2

LaPorte .89 STPBG Northwest Indiana

MPO

CN -$2,060,000.00 $0.00 ($5,060,000.00) $3,000,000.00A 31 $3,750,000.0034092 /

1172078

100% Local

Funds

CN $0.00 -$515,000.00 ($1,265,000.00) $750,000.00

Comments:MPO - CN decrease funds and change FY from 20 to 19

Resolution 18-14, Amendment 17

Gary ST 1013 New Signal

Installation

At intersection 15th Ave and

MLK Dr, multiple intersections

and 1 rail crossing

LaPorte .2 STPBG Northwest Indiana

MPO

RW -$160,000.00 $0.00 ($160,000.00) A 31 $1,096,000.0035799 /

0710064

100% Local

Funds

RW $0.00 -$40,000.00 ($40,000.00)

Comments:MPO - Request to remove all funds and eliminate project.

Resolution 18-14 Amendment 17

Gary IR 1025 Bike/Pedestrian

Facilities

Gary Green Links Trail Phase 3 LaPorte .75 STPBG Northwest Indiana

MPO

PE $300,000.00 $0.00 $300,000.00A 31 $1,650,000.0040646 /

1702158

100% Local

Funds

PE $0.00 $75,000.00 $75,000.00

Comments:MPO - Add PE phase FY19

Resolution 18-14 Amendment 17

Gary ST 1047 Road Reconstruction

(3R/4R Standards)

Industrial Highway Phase III.

Cline Ave to EJ&E RR Bridge

LaPorte 1.32 STPBG Northwest Indiana

MPO

RW $160,000.00 $0.00 $160,000.00 A 31 $5,471,000.0040733 /

1600418

100% Local

Funds

RW $0.00 $40,000.00 $40,000.00

Comments:MPO funds - add RW phase FY20

Resolution 18-14; Amend 17

Gary US 20 Enhancement Complete Streets

Enhancements

LaPorte .05 STPBG Road ROW RW $200,000.00 $0.00 $200,000.00A 31 $2,575,000.0041770 /

1801738

Northwest Indiana

MPO

CN $2,060,000.00 $0.00 $2,060,000.00

100% Local

Funds

CN $0.00 $515,000.00 $515,000.00

Comments:NIRPC MPO and State - RW State add phase FY19. CN MPO Add MPO funds FY19. Change project from State sponsor to Local

Lake County Total

Federal: $500,000.00 Match :$75,000.00 2018: 2019: $6,900,000.00 2020: -$6,325,000.00 2021:

*Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not fiscally constrained and is for information purposes.

Page 20 of 37 Report Created:11/2/2018 2:09:58PM

Page 23: An Equal Opportunity Employer - IN.gov · 2018. 10. 29. · US 31 Replace Superstructure 1.94 miles S of SR 160 over Caney Fork 40997 / A 31 Seymour 0 STP $908,046.00 Bridge Consulting

State Preservation and Local Initiated Projects FY 2018 - 2021

Indiana Department of Transportation (INDOT)

SPONSOR CONTR

ACT # /

LEAD

DES

ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL

CATEGORY

PROGRAM PHASE FEDERAL MATCHEstimated

Cost left to

Complete

Project*

2018 2019 2020 2021STIP

NAME

Madison County

Indiana Department

of Transportation

US 36 HMA Overlay,

Preventive

Maintenance

From ECL Fortville to N Jct SR 9

/SR 67

Greenfield 7.327 NHS Road Consulting PE $120,000.00 $30,000.00 $150,000.00A 31 $4,861,376.0040588 /

1701070

Road

Construction

CN $3,229,684.80 $807,421.20 $4,037,106.00

Bridge Consulting PE $32,000.00 $8,000.00 $40,000.00

Bridge

Construction

CN $507,416.00 $126,854.00 $634,270.00

Comments:Approved in MCCOG Resolution 13 --2018

Madison County Total

Federal: $3,889,100.80 Match :$972,275.20 2018: 2019: $190,000.00 2020: $4,671,376.00 2021:

*Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not fiscally constrained and is for information purposes.

Page 21 of 37 Report Created:11/2/2018 2:09:58PM

Page 24: An Equal Opportunity Employer - IN.gov · 2018. 10. 29. · US 31 Replace Superstructure 1.94 miles S of SR 160 over Caney Fork 40997 / A 31 Seymour 0 STP $908,046.00 Bridge Consulting

State Preservation and Local Initiated Projects FY 2018 - 2021

Indiana Department of Transportation (INDOT)

SPONSOR CONTR

ACT # /

LEAD

DES

ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL

CATEGORY

PROGRAM PHASE FEDERAL MATCHEstimated

Cost left to

Complete

Project*

2018 2019 2020 2021STIP

NAME

Monroe County

Indiana Department

of Transportation

SR 45 Intersect. Improv. W/

Added Turn Lanes

From 0.2 mi E of I-69 (Arlington)

to 0.93 mi E of I-69 (Kinser)

Seymour .821 NHPP Mobility Consulting PE $800,000.00 $200,000.00 $1,000,000.00A 31 $7,200,000.001700198

Mobility ROW RW $240,000.00 $60,000.00 $300,000.00

Comments:Amend PE and RW to current STIP. Amended to BMCMPO TIP per Adoption Resolution dated 9/14/18.

Indiana Department

of Transportation

SR 46 Intersect. Improv. W/

Added Turn Lanes

Intersection of SR 46 and 14th

Street in Bloomington

Seymour 0 NHPP Mobility ROW RW $8,000.00 $2,000.00 $10,000.00A 31 $2,647,850.0041349 /

1801525

Mobility

Construction

CN $2,118,280.00 $529,570.00 $2,647,850.00

Comments:Amend RW and CN phase to the current STIP. Amended to BMCMPO's TIP per Adoption Resolution 2019-01 dated 9/14/18.

Indiana Department

of Transportation

SR 45 Intersect. Improv. W/

Added Turn Lanes

At the intersection of Pete Ellis

Dr

Seymour 0 STP Safety ROW RW $80,000.00 $20,000.00 $100,000.00 A 31 $2,424,267.0041465 /

1800199

Safety Consulting PE $490,760.00 $122,690.00 $613,450.00

Comments:Amend PE and RW to current STIP. Amended to BMCMPO's TIP per Adoption Resolution 2019-01 dated 9/14/18.

Indiana Department

of Transportation

SR 45 Intersect. Improv. W/

Added Turn Lanes

Intersection of SR 45/West Ison

Rd and SR 45/South Bunger Rd

.

Seymour .285 NHPP Safety ROW RW $20,000.00 $5,000.00 $25,000.00 A 31 $968,224.0041515 /

1800198

Safety Consulting PE $100,000.00 $25,000.00 $125,000.00

Comments:Amend PE and RW to current STIP. Amended to BMCMPO's TIP per Adoption Resolution 2019-01 dated 9/14/18.

Monroe County Total

Federal: $3,857,040.00 Match :$964,260.00 2018: 2019: $1,748,450.00 2020: $2,647,850.00 2021: $425,000.00

*Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not fiscally constrained and is for information purposes.

Page 22 of 37 Report Created:11/2/2018 2:09:58PM

Page 25: An Equal Opportunity Employer - IN.gov · 2018. 10. 29. · US 31 Replace Superstructure 1.94 miles S of SR 160 over Caney Fork 40997 / A 31 Seymour 0 STP $908,046.00 Bridge Consulting

State Preservation and Local Initiated Projects FY 2018 - 2021

Indiana Department of Transportation (INDOT)

SPONSOR CONTR

ACT # /

LEAD

DES

ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL

CATEGORY

PROGRAM PHASE FEDERAL MATCHEstimated

Cost left to

Complete

Project*

2018 2019 2020 2021STIP

NAME

Parke County

Indiana Department

of Transportation

US 41 Debris Removal From

Channel

over Sugar Mill Creek; 01.28 mi

N of SR 47

Crawfordsville 0 STPBG Bridge Consulting PE $86,400.00 $21,600.00 $108,000.00A 31 $609,888.0041411 /

1801304

Bridge

Construction

CN $401,510.40 $100,377.60 $501,888.00

Comments:TCAPC T-18-08 (DES 1801353, 1801344, 1801338); IMPO 18-IMPO-016 (DES 1801348); Add FY19 PE $108,000, Add FY20 CN $501,888

Parke County Total

Federal: $487,910.40 Match :$121,977.60 2018: 2019: $108,000.00 2020: $501,888.00 2021:

*Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not fiscally constrained and is for information purposes.

Page 23 of 37 Report Created:11/2/2018 2:09:58PM

Page 26: An Equal Opportunity Employer - IN.gov · 2018. 10. 29. · US 31 Replace Superstructure 1.94 miles S of SR 160 over Caney Fork 40997 / A 31 Seymour 0 STP $908,046.00 Bridge Consulting

State Preservation and Local Initiated Projects FY 2018 - 2021

Indiana Department of Transportation (INDOT)

SPONSOR CONTR

ACT # /

LEAD

DES

ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL

CATEGORY

PROGRAM PHASE FEDERAL MATCHEstimated

Cost left to

Complete

Project*

2018 2019 2020 2021STIP

NAME

Porter County

Portage ST 1012 Road Reconstruction

(3R/4R Standards)

Central Ave. reconstruction

from Lake/Porter Co. Line to

Willowcreek Road

LaPorte 2.08 DEM Demonstration

Fund Program

PE $56,085.00 $0.00 $56,085.00A 31 $3,406,085.0034496 /

1173430

Comments:NIRPC - Demo Funds - add PE phase to FY19

Resolution 18-10 amendment 13

Porter County Total

Federal: $56,085.00 Match :$0.00 2018: 2019: $56,085.00 2020: 2021:

*Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not fiscally constrained and is for information purposes.

Page 24 of 37 Report Created:11/2/2018 2:09:58PM

Page 27: An Equal Opportunity Employer - IN.gov · 2018. 10. 29. · US 31 Replace Superstructure 1.94 miles S of SR 160 over Caney Fork 40997 / A 31 Seymour 0 STP $908,046.00 Bridge Consulting

State Preservation and Local Initiated Projects FY 2018 - 2021

Indiana Department of Transportation (INDOT)

SPONSOR CONTR

ACT # /

LEAD

DES

ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL

CATEGORY

PROGRAM PHASE FEDERAL MATCHEstimated

Cost left to

Complete

Project*

2018 2019 2020 2021STIP

NAME

Putnam County

Indiana Department

of Transportation

US 40 Bridge Deck Overlay *closing out* Bridge over CSX

Railroad, 0.25 mi E of SR 243

Crawfordsville 0 STPBG Bridge Consulting PE -$270,400.00 -$67,600.00 ($78,000.00) ($260,000.00) A 311602006

Comments:No MPO; closing out project. remove FY18 PE $78,000, removed FY20 CN $260,000

Putnam County Total

Federal: -$270,400.00 Match :-$67,600.00 2018: -$78,000.00 2019: 2020: -$260,000.00 2021:

*Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not fiscally constrained and is for information purposes.

Page 25 of 37 Report Created:11/2/2018 2:09:58PM

Page 28: An Equal Opportunity Employer - IN.gov · 2018. 10. 29. · US 31 Replace Superstructure 1.94 miles S of SR 160 over Caney Fork 40997 / A 31 Seymour 0 STP $908,046.00 Bridge Consulting

State Preservation and Local Initiated Projects FY 2018 - 2021

Indiana Department of Transportation (INDOT)

SPONSOR CONTR

ACT # /

LEAD

DES

ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL

CATEGORY

PROGRAM PHASE FEDERAL MATCHEstimated

Cost left to

Complete

Project*

2018 2019 2020 2021STIP

NAME

Rush County

Indiana Department

of Transportation

VA VARI Railroad Protection Sexton St at CSX DOT 154203F

in Rushville;154202Y Harrison

St; 154204M Arthur St

Greenfield 0 Safety Local Safety

Program - 130

CN $1,213,677.00 $0.00 $1,213,677.00A 31 $1,213,677.0039444 /

1600445

Comments:No MPO - Adding RR CN FY 19 Federal 1,213,677.

Indiana Department

of Transportation

SR 3 Bridge Deck Overlay over Little Flatrock River, 1.46

miles S. of SR 244

Greenfield 0 NHS Bridge Consulting PE $34,400.00 $8,600.00 $43,000.00A 31 $463,660.0041191 /

1800335

Bridge

Construction

CN $336,528.00 $84,132.00 $420,660.00

Comments:District Bridge Project

Rush County Total

Federal: $1,584,605.00 Match :$92,732.00 2018: 2019: $1,256,677.00 2020: 2021: $420,660.00

*Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not fiscally constrained and is for information purposes.

Page 26 of 37 Report Created:11/2/2018 2:09:58PM

Page 29: An Equal Opportunity Employer - IN.gov · 2018. 10. 29. · US 31 Replace Superstructure 1.94 miles S of SR 160 over Caney Fork 40997 / A 31 Seymour 0 STP $908,046.00 Bridge Consulting

State Preservation and Local Initiated Projects FY 2018 - 2021

Indiana Department of Transportation (INDOT)

SPONSOR CONTR

ACT # /

LEAD

DES

ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL

CATEGORY

PROGRAM PHASE FEDERAL MATCHEstimated

Cost left to

Complete

Project*

2018 2019 2020 2021STIP

NAME

Shelby County

Indiana Department

of Transportation

VA VARI Railroad Protection CR 500 E at CSX RR DOT #154

228B in Morristown

Greenfield 0 Safety Local Safety

Program - 130

CN $461,132.00 $0.00 $461,132.00A 31 $461,132.0039446 /

1600447

Comments:NO MPO - add RR CN FY 19 461,132.

Shelby County Total

Federal: $461,132.00 Match :$0.00 2018: 2019: $461,132.00 2020: 2021:

*Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not fiscally constrained and is for information purposes.

Page 27 of 37 Report Created:11/2/2018 2:09:58PM

Page 30: An Equal Opportunity Employer - IN.gov · 2018. 10. 29. · US 31 Replace Superstructure 1.94 miles S of SR 160 over Caney Fork 40997 / A 31 Seymour 0 STP $908,046.00 Bridge Consulting

State Preservation and Local Initiated Projects FY 2018 - 2021

Indiana Department of Transportation (INDOT)

SPONSOR CONTR

ACT # /

LEAD

DES

ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL

CATEGORY

PROGRAM PHASE FEDERAL MATCHEstimated

Cost left to

Complete

Project*

2018 2019 2020 2021STIP

NAME

Spencer County

Santa Claus VA 1016 Bike/Pedestrian

Facilities

Lincoln Boyhood-Santa Claus

Discovery Trail

Vincennes 0 STPBG Local Trans

Enhancement

Program

CN $0.00 $0.00 $80,000.00 ($80,000.00)A 31 $1,785,000.0036122 /

1297252

Local

Transportation

Alternatives

CN -$1,716,511.34 $0.00 $1,268,000.00 ($2,984,511.34)

100% Local

Funds

CN $0.00 -$573,277.83 $337,000.00 ($910,277.83)

Comments:Amend 2018-2021 STIP. Removed all CN from FY19 and added FY20 CN Federal $1,268,000.00, FY20 CN Federal $80,000.00, FY20 CN Local $337,000.00. No MPO.

Santa Claus ST 1023 Bike/Pedestrian

Facilities

Eastside Trail:Trail connecting

Ray Yellig Park Trail to

American Discovery Trai

Vincennes 1 STPBG Local Trans

Enhancement

Program

CN $961,696.00 $0.00 $1,320,000.00($358,304.00)A 31 $1,794,480.0041722 /

1383661

Local Trans

Enhancement

Program

RW $100,000.00 $0.00 $100,000.00

100% Local

Funds

CN $0.00 $180,904.00 $330,000.00($149,096.00)

100% Local

Funds

RW $0.00 $25,000.00 $25,000.00

Comments:Amend 2018-2021 STIP. Adding FY19 RW Federal $100,000.00, FY19 RW Local $25,000.00, and removing FY19 CN Federal by $358304.00 and removing CN Local $148,096.00. Adding FY21 CN Federal $1,320,000.00 and FY21 CN Local $330,000.00. No MPO.

Spencer County Total

Federal: -$654,815.34 Match :-$367,373.83 2018: 2019: -$4,357,189.17 2020: $1,685,000.00 2021: $1,650,000.00

*Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not fiscally constrained and is for information purposes.

Page 28 of 37 Report Created:11/2/2018 2:09:58PM

Page 31: An Equal Opportunity Employer - IN.gov · 2018. 10. 29. · US 31 Replace Superstructure 1.94 miles S of SR 160 over Caney Fork 40997 / A 31 Seymour 0 STP $908,046.00 Bridge Consulting

State Preservation and Local Initiated Projects FY 2018 - 2021

Indiana Department of Transportation (INDOT)

SPONSOR CONTR

ACT # /

LEAD

DES

ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL

CATEGORY

PROGRAM PHASE FEDERAL MATCHEstimated

Cost left to

Complete

Project*

2018 2019 2020 2021STIP

NAME

Tipton County

Indiana Department

of Transportation

SR 28 Bridge Deck Overlay over Dixon Creek, 3.75 miles W

of US 31

Greenfield 0 STP Bridge Consulting PE $48,000.00 $12,000.00 $60,000.00A 31 $561,427.0041193 /

1800333

Bridge

Construction

CN $401,141.60 $100,285.40 $501,427.00

Comments:District Bridge Project.

Tipton County Total

Federal: $449,141.60 Match :$112,285.40 2018: 2019: $60,000.00 2020: 2021: $501,427.00

*Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not fiscally constrained and is for information purposes.

Page 29 of 37 Report Created:11/2/2018 2:09:58PM

Page 32: An Equal Opportunity Employer - IN.gov · 2018. 10. 29. · US 31 Replace Superstructure 1.94 miles S of SR 160 over Caney Fork 40997 / A 31 Seymour 0 STP $908,046.00 Bridge Consulting

State Preservation and Local Initiated Projects FY 2018 - 2021

Indiana Department of Transportation (INDOT)

SPONSOR CONTR

ACT # /

LEAD

DES

ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL

CATEGORY

PROGRAM PHASE FEDERAL MATCHEstimated

Cost left to

Complete

Project*

2018 2019 2020 2021STIP

NAME

Union County

Indiana Department

of Transportation

SR 101 Bridge Deck Overlay over Hannah Creek, 3.78 miles

S. of US 27

Greenfield 0 STP Bridge

Construction

CN $659,725.60 $164,931.40 $824,657.00 A 31 $907,657.0041194 /

1800320

Bridge Consulting PE $66,400.00 $16,600.00 $83,000.00

Comments:District Bridge Project

Union County Total

Federal: $726,125.60 Match :$181,531.40 2018: 2019: $83,000.00 2020: 2021: $824,657.00

*Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not fiscally constrained and is for information purposes.

Page 30 of 37 Report Created:11/2/2018 2:09:58PM

Page 33: An Equal Opportunity Employer - IN.gov · 2018. 10. 29. · US 31 Replace Superstructure 1.94 miles S of SR 160 over Caney Fork 40997 / A 31 Seymour 0 STP $908,046.00 Bridge Consulting

State Preservation and Local Initiated Projects FY 2018 - 2021

Indiana Department of Transportation (INDOT)

SPONSOR CONTR

ACT # /

LEAD

DES

ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL

CATEGORY

PROGRAM PHASE FEDERAL MATCHEstimated

Cost left to

Complete

Project*

2018 2019 2020 2021STIP

NAME

Vanderburgh County

Evansville ST 1 Road Reconstruction

(3R/4R Standards)

Walnut Street from US 41 to

Lincoln Park Drive - Phase I

Vincennes 2.07 Multiple Evansville MPO -

PYB

CN $512,858.00 $0.00 $512,858.00 A 31 $4,106,451.0040124 /

1700400

Evansville MPO CN $1,868,302.00 $0.00 $1,868,302.00

100% Local

Funds

CN $0.00 $595,291.00 $595,291.00

Comments:Amend 2018-2021 STIP. Adding FY20 CN Local $595,291.00. FY20 CN MPO $1,868,302.00, FY20 CN MPO $512,858.00. Per MPO TIP Mod Letter dated 8/10/2018.

Evansville ST 1 Road Reconstruction

(3R/4R Standards)

Walnut St. from Lincoln Park Dr.

to Vann Ave. includes trail

connection to State Hospital.

Vincennes 0 Multiple Evansville MPO CN $2,522,000.00 $0.00 $2,522,000.00 A 31 $3,602,500.0041598 /

1801727

100% Local

Funds

CN $0.00 $630,500.00 $630,500.00

Comments:Amend 2018-2021 STIP. Adding FY21 CN MPO $2,522,000.00, FY21 CN Local $630,500.00 per EMPO TIP Mod Letter dated 8/10/2018.

Vanderburgh County Total

Federal: $4,903,160.00 Match :$1,225,791.00 2018: 2019: 2020: $2,976,451.00 2021: $3,152,500.00

*Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not fiscally constrained and is for information purposes.

Page 31 of 37 Report Created:11/2/2018 2:09:58PM

Page 34: An Equal Opportunity Employer - IN.gov · 2018. 10. 29. · US 31 Replace Superstructure 1.94 miles S of SR 160 over Caney Fork 40997 / A 31 Seymour 0 STP $908,046.00 Bridge Consulting

State Preservation and Local Initiated Projects FY 2018 - 2021

Indiana Department of Transportation (INDOT)

SPONSOR CONTR

ACT # /

LEAD

DES

ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL

CATEGORY

PROGRAM PHASE FEDERAL MATCHEstimated

Cost left to

Complete

Project*

2018 2019 2020 2021STIP

NAME

Various County

Indiana Department

of Transportation

VA VARI Raised Pavement

Markings,

Refurbished

Various Locations Within the

Fort Wayne District.

Fort Wayne 0 Safety Safety

Construction

CN $262,300.00 $65,575.00 $327,875.00 A 31 $327,875.0041065 /

1800940

Comments:NO MPO. Adding CN to FY 2021 into FY 2018 - 2021 STIP.

Indiana Department

of Transportation

VA VARI ITS Traffic

Management Systems

Greenfield & Seymour District

Signal Controller/Communicatio

ns Upgrade in FY 20

Greenfield 0 Multiple Statewide

Consulting

PE $104,000.00 $26,000.00 $130,000.00A 31 $1,572,421.0041232 /

1800945

Statewide

Construction

CN $1,153,936.80 $288,484.20 $1,442,421.00

Comments:Amend FY 19 PE phase and FY 20 CN phase into the current STIP. No MPO.

Indiana Department

of Transportation

VA VARI ITS Devices

Maintenance

Contracts

Greenfield & Crawfordsville

District ITS & Signal

Maintenance Contract - FY 20

Multiple Districts 0 Multiple Statewide

Consulting

PE $0.00 $30,000.00 $30,000.00A 31 $419,584.0041255 /

1800906

Statewide

Construction

CN $0.00 $389,584.00 $389,584.00

Comments:Amend FY 19 PE phase and FY 20 CN phase into the current STIP. No MPO.

Indiana Department

of Transportation

VA VARI ITS Devices

Maintenance

Contracts

Fort Wayne & LaPorte District

ITS & Signal Maintenance

Contract - FY 20

Multiple Districts 0 Multiple Statewide

Construction

CN $0.00 $388,558.00 $388,558.00 A 31 $418,558.0041256 /

1801342

Statewide

Consulting

PE $0.00 $30,000.00 $30,000.00

Comments:Amend FY 19 PE phase and FY 20 CN phase into the current STIP. No MPO.

Indiana Department

of Transportation

VA VARI ITS Devices

Maintenance

Contracts

Seymour & Vincennes District

ITS & Signal Maintenance

Contract - FY 20

Multiple Districts 0 Multiple Statewide

Construction

CN $0.00 $194,279.00 $194,279.00 A 31 $209,279.0041257 /

1801343

Statewide

Consulting

PE $0.00 $15,000.00 $15,000.00

Comments:Amend FY 19 PE phase and FY 20 CN phase into the current STIP. No MPO.

Indiana Department

of Transportation

VA VARI Install New Guard Rail Various locations adding

guardrail or closing gaps in

existing guardrail. See Project

Greenfield 0 Multiple District Other

Consulting

PE $22,604.80 $5,651.20 $28,256.00A 31 $314,256.0041662 /

1801832

District Other

Construction

CN $228,800.00 $57,200.00 $286,000.00

Comments:New Guardrail in various locations throughout the District.

Indiana Department

of Transportation

VA VARI District Wide Bridge

Maintenance

IDIQ, Various locations

throughout the Seymour District

Seymour 0 STP Bridge

Construction

CN $800,000.00 $200,000.00 $1,000,000.00A 31 $1,000,000.0041681 /

1801948

Comments:Amend CN to the current STIP. Amended to KIPDA's TIP per Administrative Modification 21 dated 9/27/18. Amended to CAMPO's TIP per Resolution 2018-12 dated 10/4/18, and OKI'sTIP per Administrative Modification 12 dated 10/9/18. Submitted for inclusion in all TIP's in Seymour District.

Indiana Department

of Transportation

VA 1019 Patch And Rehab

Pavement

IDIQ Various Locations

Throughout the LaPorte District

LaPorte 0 NHPP Road

Construction

CN $0.00 $1,000,000.00 $1,000,000.00A 31 $1,000,000.0041687 /

1801958

Comments:Amend FY19 CN Phase into the current STIP, This is 100% state funds.

Indiana Department

of Transportation

VA 1019 District Wide Bridge

Maintenance

IDIQ Various Locations

Throughout the LaPorte District

LaPorte 0 NHPP Bridge

Construction

CN $800,000.00 $200,000.00 $1,000,000.00A 31 $1,000,000.0041688 /

1801959

Comments:MACOG approved 10/10/18 Resolution 26-18. This is also going through NIRPC approval.

*Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not fiscally constrained and is for information purposes.

Page 32 of 37 Report Created:11/2/2018 2:09:58PM

Page 35: An Equal Opportunity Employer - IN.gov · 2018. 10. 29. · US 31 Replace Superstructure 1.94 miles S of SR 160 over Caney Fork 40997 / A 31 Seymour 0 STP $908,046.00 Bridge Consulting

State Preservation and Local Initiated Projects FY 2018 - 2021

Indiana Department of Transportation (INDOT)

SPONSOR CONTR

ACT # /

LEAD

DES

ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL

CATEGORY

PROGRAM PHASE FEDERAL MATCHEstimated

Cost left to

Complete

Project*

2018 2019 2020 2021STIP

NAME

Various County Total

Federal: $3,371,641.60 Match :$2,890,331.40 2018: 2019: $3,519,256.00 2020: $2,414,842.00 2021: $327,875.00

*Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not fiscally constrained and is for information purposes.

Page 33 of 37 Report Created:11/2/2018 2:09:58PM

Page 36: An Equal Opportunity Employer - IN.gov · 2018. 10. 29. · US 31 Replace Superstructure 1.94 miles S of SR 160 over Caney Fork 40997 / A 31 Seymour 0 STP $908,046.00 Bridge Consulting

State Preservation and Local Initiated Projects FY 2018 - 2021

Indiana Department of Transportation (INDOT)

SPONSOR CONTR

ACT # /

LEAD

DES

ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL

CATEGORY

PROGRAM PHASE FEDERAL MATCHEstimated

Cost left to

Complete

Project*

2018 2019 2020 2021STIP

NAME

Vermillion County

Indiana Department

of Transportation

US 36 Bridge Painting @ Wabash River; 01.79 mi E of

SR 63

Crawfordsville 0 STPBG Bridge Consulting PE $4,800.00 $1,200.00 $6,000.00A 31 $2,678,971.0040942 /

1800417

Comments:No MPO; Add FY19 PE $6,000

Vermillion County Total

Federal: $4,800.00 Match :$1,200.00 2018: 2019: $6,000.00 2020: 2021:

*Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not fiscally constrained and is for information purposes.

Page 34 of 37 Report Created:11/2/2018 2:09:58PM

Page 37: An Equal Opportunity Employer - IN.gov · 2018. 10. 29. · US 31 Replace Superstructure 1.94 miles S of SR 160 over Caney Fork 40997 / A 31 Seymour 0 STP $908,046.00 Bridge Consulting

State Preservation and Local Initiated Projects FY 2018 - 2021

Indiana Department of Transportation (INDOT)

SPONSOR CONTR

ACT # /

LEAD

DES

ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL

CATEGORY

PROGRAM PHASE FEDERAL MATCHEstimated

Cost left to

Complete

Project*

2018 2019 2020 2021STIP

NAME

Warren County

Indiana Department

of Transportation

SR 28 Bridge Thin Deck

Overlay

Eliminating - Bridge over

Goodwine Creek (Johnson

Branch), 0.18 mi W of SR 263

Crawfordsville 0 STPBG Bridge

Construction

CN -$39,200.00 -$9,800.00 ($49,000.00) A 31 $0.001602070

Comments:No MPO; removed FY20 funding. Eliminating project.

Warren County Total

Federal: -$39,200.00 Match :-$9,800.00 2018: 2019: 2020: -$49,000.00 2021:

*Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not fiscally constrained and is for information purposes.

Page 35 of 37 Report Created:11/2/2018 2:09:58PM

Page 38: An Equal Opportunity Employer - IN.gov · 2018. 10. 29. · US 31 Replace Superstructure 1.94 miles S of SR 160 over Caney Fork 40997 / A 31 Seymour 0 STP $908,046.00 Bridge Consulting

State Preservation and Local Initiated Projects FY 2018 - 2021

Indiana Department of Transportation (INDOT)

SPONSOR CONTR

ACT # /

LEAD

DES

ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL

CATEGORY

PROGRAM PHASE FEDERAL MATCHEstimated

Cost left to

Complete

Project*

2018 2019 2020 2021STIP

NAME

Wayne County

Indiana Department

of Transportation

US 40 Concrete Pavement

Restoration (CPR)

from 0.15 mi W of I-70 to 0.18

mi E of I-70 (Indiana/Ohio Ln)

Greenfield .33 STPBG Road Consulting PE $48,240.00 $12,060.00 $60,300.00A 31 $372,207.0040615 /

1700904

Road

Construction

CN $80,800.00 $20,200.00 $101,000.00

Comments:PE added for Consultant design

Wayne County Total

Federal: $129,040.00 Match :$32,260.00 2018: 2019: $60,300.00 2020: 2021: $101,000.00

*Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not fiscally constrained and is for information purposes.

Page 36 of 37 Report Created:11/2/2018 2:09:58PM

Page 39: An Equal Opportunity Employer - IN.gov · 2018. 10. 29. · US 31 Replace Superstructure 1.94 miles S of SR 160 over Caney Fork 40997 / A 31 Seymour 0 STP $908,046.00 Bridge Consulting

State Preservation and Local Initiated Projects FY 2018 - 2021

Indiana Department of Transportation (INDOT)

SPONSOR CONTR

ACT # /

LEAD

DES

ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL

CATEGORY

PROGRAM PHASE FEDERAL MATCHEstimated

Cost left to

Complete

Project*

2018 2019 2020 2021STIP

NAME

White County

Indiana Department

of Transportation

SR 18 Bridge Thin Deck

Overlay

Eliminating - Bridge over

Vanatta Ditch, 0.80 mi W of US

231

Crawfordsville 0 STPBG Bridge

Construction

CN -$33,600.00 -$8,400.00 ($42,000.00) A 31 $0.001602050

Comments:No MPO; removed FY20 CN funds. Eliminating project.

Indiana Department

of Transportation

US 24 Replace

Superstructure

Us [email protected] Ditch, 00.71mi

W US 421

LaPorte 0 NHPP Bridge Consulting PE $64,000.00 $16,000.00 $80,000.00A 31 $996,878.001703039

Comments:Amend FY19 PE Phase into the current STIP. No MPO

White County Total

Federal: $30,400.00 Match :$7,600.00 2018: 2019: $80,000.00 2020: -$42,000.00 2021:

Grand Total

Federal: $33,339,560.48 2019: $10,716,753.112018: -$78,000.00 2021: $16,284,853.002020: $15,993,633.00Match : $9,577,678.63

*Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not fiscally constrained and is for information purposes.

Page 37 of 37 Report Created:11/2/2018 2:09:58PM