www.in.gov/dot/ An Equal Opportunity Employer
100 North Senate Avenue Room N955 Indianapolis, Indiana 46204
PHONE: (317) 232-0223 FAX: (317) 232-1499 Eric Holcomb, Governor
Joe McGuinness, Commissioner
October 29, 2018 Ms. Mayela Sosa, Division Administrator FHWA Indiana Division 575 North Pennsylvania Street, Room 254 Indianapolis, Indiana 46204 Dear Ms. Sosa: The Indiana Department of Transportation requests the projects listed in STIP Amendment 18-31 to be incorporated into the 2018-2021 Statewide Transportation Improvement Program (STIP). The required Metropolitan Planning Organization (MPO) Transportation Improvement Program (TIP) documents have been included in this request and duly noted in the Amendment. We have determined that the proposed amendments are: 1) consistent with the transportation plan; 2) the TIP remains fiscally constrained in that federal funding resources are sufficient to support the new or modified projects; and 3) conform to state and national air quality standards. A draft of this amendment was posted on INDOT’s STIP website http://www.in.gov/indot/STIP for comments. No comments were given about any project listed. We request your review and approval of the subject amendment. Should you have any questions pertaining to this amendment, please contact Michael McNeil, STIP Specialist at (317) 232-0223 or at [email protected]. Sincerely,
Roy Nunnally, Director Asset Planning & Management Division
State Preservation and Local Initiated Projects FY 2018 - 2021
Indiana Department of Transportation (INDOT)
SPONSOR CONTR
ACT # /
LEAD
DES
ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL
CATEGORY
PROGRAM PHASE FEDERAL MATCHEstimated
Cost left to
Complete
Project*
2018 2019 2020 2021STIP
NAME
Allen County
Indiana Department
of Transportation
SR 37 New Signal
Installation
0.27 miles north of I-469 at St.
Joe Center Road/ Irving Road.
Fort Wayne 0 STPBG District Other
Construction
CN $77,422.40 $19,355.60 $96,778.00A 31 $96,778.0040815 /
1702734
Comments:NIRCC Res 18-135. DES 1702734 Adding CN to FY 2019 into FY 2018 - 2021 STIP.
Allen County Total
Federal: $77,422.40 Match :$19,355.60 2018: 2019: $96,778.00 2020: 2021:
*Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not fiscally constrained and is for information purposes.
Page 1 of 37 Report Created:11/2/2018 2:09:58PM
State Preservation and Local Initiated Projects FY 2018 - 2021
Indiana Department of Transportation (INDOT)
SPONSOR CONTR
ACT # /
LEAD
DES
ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL
CATEGORY
PROGRAM PHASE FEDERAL MATCHEstimated
Cost left to
Complete
Project*
2018 2019 2020 2021STIP
NAME
Bartholomew County
Columbus MS 1 Railroad Protection Railroad crossings between
SR 46 and 11th Street
Seymour 0 STPBG Columbus MPO CN $0.00 $0.00 $0.00A 31 $0.0040372 /
1701327
100% Local
Funds
CN $0.00 $0.00 $0.00
Comments:Funding removed, project is now 100% Local. No MPO.
Bartholomew County Total
Federal: $0.00 Match :$0.00 2018: 2019: $0.00 2020: 2021:
*Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not fiscally constrained and is for information purposes.
Page 2 of 37 Report Created:11/2/2018 2:09:58PM
State Preservation and Local Initiated Projects FY 2018 - 2021
Indiana Department of Transportation (INDOT)
SPONSOR CONTR
ACT # /
LEAD
DES
ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL
CATEGORY
PROGRAM PHASE FEDERAL MATCHEstimated
Cost left to
Complete
Project*
2018 2019 2020 2021STIP
NAME
Benton County
Indiana Department
of Transportation
US 52 HMA Overlay Minor
Structural
From 0.41 mi W of SR 18 (E jct)
to 0.10 mi E of SR 352
Crawfordsville 8.398 STPBG Road ROW RW $64,000.00 $16,000.00 $80,000.00A 31 $12,846,405.2040582 /
1700104
Comments:No MPO; Add FY19 ROW $80,000
Benton County Total
Federal: $64,000.00 Match :$16,000.00 2018: 2019: $80,000.00 2020: 2021:
*Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not fiscally constrained and is for information purposes.
Page 3 of 37 Report Created:11/2/2018 2:09:58PM
State Preservation and Local Initiated Projects FY 2018 - 2021
Indiana Department of Transportation (INDOT)
SPONSOR CONTR
ACT # /
LEAD
DES
ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL
CATEGORY
PROGRAM PHASE FEDERAL MATCHEstimated
Cost left to
Complete
Project*
2018 2019 2020 2021STIP
NAME
Boone County
Indiana Department
of Transportation
I 65 Bridge Deck Overlay Closing Out - 0.20 mi N of US
52, NBL over Prairie Creek
Crawfordsville 0 NHPP Bridge
Construction
CN -$1,078,200.00 -$119,800.00 ($1,198,000.00)A 31 $0.001296049
Comments:No MPO, removed FY19 CN. Project closing out.
Indiana Department
of Transportation
I 65 Bridge Deck Overlay Eliminating - 0.20 mi N of US 52,
SBL over Prairie Creek
Crawfordsville 0 NHPP Bridge
Construction
CN -$1,125,900.00 -$125,100.00 ($1,251,000.00)A 31 $0.001296050
Comments:No MPO; remove FY19 CN funds. Eliminating project
Lebanon ST 1034 Road Reconstruction
(3R/4R Standards)
Grant Street from Washington
St. to Fordice Rd.
Crawfordsville .448 STPBG 100% Local
Funds
PE $0.00 $108,599.00 $108,599.00A 31 $4,100,000.0040877 /
1800237
Group III Program PE $434,396.00 $0.00 $434,396.00
Comments:NO MPO, please add PE funds in FY 19 in the amount of 434,396 federal and 108,599 local
Boone County Total
Federal: -$1,769,704.00 Match :-$136,301.00 2018: 2019: -$1,906,005.00 2020: 2021:
*Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not fiscally constrained and is for information purposes.
Page 4 of 37 Report Created:11/2/2018 2:09:58PM
State Preservation and Local Initiated Projects FY 2018 - 2021
Indiana Department of Transportation (INDOT)
SPONSOR CONTR
ACT # /
LEAD
DES
ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL
CATEGORY
PROGRAM PHASE FEDERAL MATCHEstimated
Cost left to
Complete
Project*
2018 2019 2020 2021STIP
NAME
Carroll County
Indiana Department
of Transportation
SR 75 Replace
Superstructure
Sr [email protected] Run, 01.17mi
N of SR 18
LaPorte 0 STP Bridge Consulting PE $43,200.00 $10,800.00 $54,000.00A 31 $665,281.001703044
Comments:Amend FY19 PE Phase into the current STIP. No MPO
Carroll County Total
Federal: $43,200.00 Match :$10,800.00 2018: 2019: $54,000.00 2020: 2021:
*Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not fiscally constrained and is for information purposes.
Page 5 of 37 Report Created:11/2/2018 2:09:58PM
State Preservation and Local Initiated Projects FY 2018 - 2021
Indiana Department of Transportation (INDOT)
SPONSOR CONTR
ACT # /
LEAD
DES
ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL
CATEGORY
PROGRAM PHASE FEDERAL MATCHEstimated
Cost left to
Complete
Project*
2018 2019 2020 2021STIP
NAME
Clark County
Indiana Department
of Transportation
US 31 Replace
Superstructure
1.94 miles S of SR 160 over
Caney Fork
Seymour 0 STP Bridge Consulting PE $144,000.00 $36,000.00 $180,000.00A 31 $908,046.0040997 /
1593192
Bridge
Construction
CN $582,436.80 $145,609.20 $728,046.00
Comments:Amend PE and CN to the current STIP. Amended to KIPDA's TIP per Administrative Modification 21 dated 9/27/18.
Clarksville ST 1046 Traffic Signals
Modernization
Eastern Boulevard from Lewis
and Clark Parkway to Brooks
Avenue
Seymour 1.04 NHPP Louisville MPO CN $77,080.00 $0.00 $77,080.00A 31 $85,644.0041379 /
1801599
100% Local
Funds
CN $0.00 $8,564.00 $8,564.00
Comments:Adding funding to FY 2019 CN. KIPDA FY 2018-2021 TIP Amendment #1 dated March 22, 2018.
Clark County Total
Federal: $803,516.80 Match :$190,173.20 2018: 2019: $265,644.00 2020: 2021: $728,046.00
*Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not fiscally constrained and is for information purposes.
Page 6 of 37 Report Created:11/2/2018 2:09:58PM
State Preservation and Local Initiated Projects FY 2018 - 2021
Indiana Department of Transportation (INDOT)
SPONSOR CONTR
ACT # /
LEAD
DES
ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL
CATEGORY
PROGRAM PHASE FEDERAL MATCHEstimated
Cost left to
Complete
Project*
2018 2019 2020 2021STIP
NAME
Clay County
Indiana Department
of Transportation
SR 59 Debris Removal From
Channel
over Eel River; 04.65 mi S of
SR 246
Crawfordsville 0 STPBG Bridge Consulting PE $43,200.00 $10,800.00 $54,000.00A 31 $375,280.0041400 /
1801305
Bridge
Construction
CN $191,771.20 $47,942.80 $239,714.00
Comments:IMPO - 18-IMPO-016 (DES 1801336); add FY19 PE $54.000, add FY20 CN $239,714
Clay County Total
Federal: $234,971.20 Match :$58,742.80 2018: 2019: $54,000.00 2020: $239,714.00 2021:
*Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not fiscally constrained and is for information purposes.
Page 7 of 37 Report Created:11/2/2018 2:09:58PM
State Preservation and Local Initiated Projects FY 2018 - 2021
Indiana Department of Transportation (INDOT)
SPONSOR CONTR
ACT # /
LEAD
DES
ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL
CATEGORY
PROGRAM PHASE FEDERAL MATCHEstimated
Cost left to
Complete
Project*
2018 2019 2020 2021STIP
NAME
Clinton County
Indiana Department
of Transportation
I 65 Bridge Deck Overlay Eliminating - SBL, over Brush
Creek. 4.89 mi N of SR 47
Crawfordsville 0 NHPP Bridge
Construction
CN -$1,140,300.00 -$126,700.00 ($1,267,000.00)A 31 $0.001296133
Comments:No MPO; removed FY19 CN funds
Frankfort ST 1016 Road Reconstruction
(3R/4R Standards)
Washington Ave. from
Washington St. to Williams St.,
Frankfort, Indiana
Crawfordsville .4 STPBG 100% Local
Funds
CN $0.00 $661,000.00 $661,000.00 A 31 $3,200,000.0041085 /
1800236
Group III Program CN $2,644,000.00 $0.00 $2,644,000.00
Comments:NO MPO, please add FY 2020 funds for CN in the amount of 2,644,000 federal and 661,000 federal
Clinton County Total
Federal: $1,503,700.00 Match :$534,300.00 2018: 2019: -$1,267,000.00 2020: $3,305,000.00 2021:
*Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not fiscally constrained and is for information purposes.
Page 8 of 37 Report Created:11/2/2018 2:09:58PM
State Preservation and Local Initiated Projects FY 2018 - 2021
Indiana Department of Transportation (INDOT)
SPONSOR CONTR
ACT # /
LEAD
DES
ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL
CATEGORY
PROGRAM PHASE FEDERAL MATCHEstimated
Cost left to
Complete
Project*
2018 2019 2020 2021STIP
NAME
Dearborn County
Dearborn County IR 1026 Slide Correction Lower Dillsboro Rd, 2800 ft
west of Gatch Hill Rd to 1500 ft
west of Gatch Hill
Seymour .25 STPBG Group IV Program PE $274,400.00 $0.00 $274,400.00A 31 $2,124,400.0040889 /
1702959
100% Local
Funds
PE $0.00 $54,880.00 $54,880.00
Comments:Adding PE funds for FY 2018. NO MPO
Dearborn County Total
Federal: $274,400.00 Match :$54,880.00 2018: 2019: $329,280.00 2020: 2021:
*Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not fiscally constrained and is for information purposes.
Page 9 of 37 Report Created:11/2/2018 2:09:58PM
State Preservation and Local Initiated Projects FY 2018 - 2021
Indiana Department of Transportation (INDOT)
SPONSOR CONTR
ACT # /
LEAD
DES
ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL
CATEGORY
PROGRAM PHASE FEDERAL MATCHEstimated
Cost left to
Complete
Project*
2018 2019 2020 2021STIP
NAME
Decatur County
Indiana Department
of Transportation
I 74 ITS Traffic
Management Systems
CCTV Cameras/Detection from
US 421 to US 52
Seymour 37.131 Interstate Statewide
Consulting
PE $72,000.00 $8,000.00 $80,000.00A 31 $955,000.0041272 /
1801416
Statewide
Construction
CN $787,500.00 $87,500.00 $875,000.00
Comments:Amend FY 19 PE phase and FY 20 CN phase into the current STIP. No MPO.
Decatur County Total
Federal: $859,500.00 Match :$95,500.00 2018: 2019: $80,000.00 2020: $875,000.00 2021:
*Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not fiscally constrained and is for information purposes.
Page 10 of 37 Report Created:11/2/2018 2:09:58PM
State Preservation and Local Initiated Projects FY 2018 - 2021
Indiana Department of Transportation (INDOT)
SPONSOR CONTR
ACT # /
LEAD
DES
ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL
CATEGORY
PROGRAM PHASE FEDERAL MATCHEstimated
Cost left to
Complete
Project*
2018 2019 2020 2021STIP
NAME
Elkhart County
Indiana Department
of Transportation
SR 19 Replace
Superstructure
Over Christiana Creek, 2.43
Miles South of I-90.
Fort Wayne .3 NHPP Bridge Consulting PE $396,000.00 $99,000.00 $495,000.00A 31 $4,450,316.0041562 /
1800057
Comments:MACOG Resolution 25-18. DES 1800057 Adding PE to FY 2019 into FY 2018 - 2021 STIP.
Elkhart County Total
Federal: $396,000.00 Match :$99,000.00 2018: 2019: $495,000.00 2020: 2021:
*Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not fiscally constrained and is for information purposes.
Page 11 of 37 Report Created:11/2/2018 2:09:58PM
State Preservation and Local Initiated Projects FY 2018 - 2021
Indiana Department of Transportation (INDOT)
SPONSOR CONTR
ACT # /
LEAD
DES
ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL
CATEGORY
PROGRAM PHASE FEDERAL MATCHEstimated
Cost left to
Complete
Project*
2018 2019 2020 2021STIP
NAME
Fayette County
Indiana Department
of Transportation
SR 121 HMA Overlay,
Preventive
Maintenance
From US 52 to SR 44 Greenfield 15.293 STP Road Consulting PE $180,000.00 $45,000.00 $225,000.00A 31 $3,011,339.0041091 /
1800747
Road
Construction
CN $2,229,071.20 $557,267.80 $2,786,339.00
Comments:New Road project
Fayette County Total
Federal: $2,409,071.20 Match :$602,267.80 2018: 2019: $225,000.00 2020: 2021: $2,786,339.00
*Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not fiscally constrained and is for information purposes.
Page 12 of 37 Report Created:11/2/2018 2:09:58PM
State Preservation and Local Initiated Projects FY 2018 - 2021
Indiana Department of Transportation (INDOT)
SPONSOR CONTR
ACT # /
LEAD
DES
ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL
CATEGORY
PROGRAM PHASE FEDERAL MATCHEstimated
Cost left to
Complete
Project*
2018 2019 2020 2021STIP
NAME
Fountain County
Indiana Department
of Transportation
US 41 Bridge Thin Deck
Overlay
Eliminating - Bridge over Irish
Run Creek, 1.27 mi S of US 136
Crawfordsville 0 STPBG Bridge
Construction
CN -$65,600.00 -$16,400.00 ($82,000.00) A 31 $0.001602072
Comments:No MPO; removed FY20 $82,000. Eliminating DES
Fountain County Total
Federal: -$65,600.00 Match :-$16,400.00 2018: 2019: 2020: -$82,000.00 2021:
*Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not fiscally constrained and is for information purposes.
Page 13 of 37 Report Created:11/2/2018 2:09:58PM
State Preservation and Local Initiated Projects FY 2018 - 2021
Indiana Department of Transportation (INDOT)
SPONSOR CONTR
ACT # /
LEAD
DES
ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL
CATEGORY
PROGRAM PHASE FEDERAL MATCHEstimated
Cost left to
Complete
Project*
2018 2019 2020 2021STIP
NAME
Fulton County
Indiana Department
of Transportation
SR 25 Replace
Superstructure
Sr [email protected] Creek, 01.04mi
E SR 331
LaPorte 0 STP Bridge Consulting PE $44,000.00 $11,000.00 $55,000.00A 31 $679,970.001703040
Comments:Amend FY19 PE Phase into the current STIP. No MPO
Fulton County Total
Federal: $44,000.00 Match :$11,000.00 2018: 2019: $55,000.00 2020: 2021:
*Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not fiscally constrained and is for information purposes.
Page 14 of 37 Report Created:11/2/2018 2:09:58PM
State Preservation and Local Initiated Projects FY 2018 - 2021
Indiana Department of Transportation (INDOT)
SPONSOR CONTR
ACT # /
LEAD
DES
ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL
CATEGORY
PROGRAM PHASE FEDERAL MATCHEstimated
Cost left to
Complete
Project*
2018 2019 2020 2021STIP
NAME
Hendricks County
Indiana Department
of Transportation
SR 75 Drainage Ditch
Correction
0.26 miles S to 0.16 miles S of
US 36
Crawfordsville 0 STPBG District Other
Consulting
PE $80,000.00 $20,000.00 $100,000.00A 31 $323,000.0041658 /
1801829
District Other
Construction
CN $178,400.00 $44,600.00 $223,000.00
Comments:No MPO; add FY19 PE $100,000, add FY20 CN $223,000
Hendricks County Total
Federal: $258,400.00 Match :$64,600.00 2018: 2019: $100,000.00 2020: $223,000.00 2021:
*Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not fiscally constrained and is for information purposes.
Page 15 of 37 Report Created:11/2/2018 2:09:58PM
State Preservation and Local Initiated Projects FY 2018 - 2021
Indiana Department of Transportation (INDOT)
SPONSOR CONTR
ACT # /
LEAD
DES
ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL
CATEGORY
PROGRAM PHASE FEDERAL MATCHEstimated
Cost left to
Complete
Project*
2018 2019 2020 2021STIP
NAME
Henry County
Indiana Department
of Transportation
SR 3 Concrete Pavement
Restoration (CPR)
from SR 38 to 2.55 Mi. N of SR
38
Greenfield 2.549 NHPP Road
Construction
CN $3,564,294.40 $891,073.60 $4,455,368.00 A 31 $4,455,368.0041087 /
1800759
Comments:CPR project.
Indiana Department
of Transportation
SR 103 HMA Overlay,
Preventive
Maintenance
from 2.21 miles S. of SR 38(SC
L New Castle) to SR 38
Greenfield 2.213 NHPP Road Consulting PE $73,600.00 $18,400.00 $92,000.00A 31 $1,003,981.0041096 /
1800744
Road
Construction
CN $729,584.80 $182,396.20 $911,981.00
Comments:Road Resurfacing
Henry County Total
Federal: $4,367,479.20 Match :$1,091,869.80 2018: 2019: $92,000.00 2020: 2021: $5,367,349.00
*Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not fiscally constrained and is for information purposes.
Page 16 of 37 Report Created:11/2/2018 2:09:58PM
State Preservation and Local Initiated Projects FY 2018 - 2021
Indiana Department of Transportation (INDOT)
SPONSOR CONTR
ACT # /
LEAD
DES
ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL
CATEGORY
PROGRAM PHASE FEDERAL MATCHEstimated
Cost left to
Complete
Project*
2018 2019 2020 2021STIP
NAME
Jasper County
Indiana Department
of Transportation
US 231 HMA Overlay,
Preventive
Maintenance
1.44mi N of SR 114 (CR 400S/
Wood Rd) to SR 14
LaPorte 4.559 NHPP Road Consulting PE $70,400.00 $17,600.00 $88,000.00A 31 $1,098,020.001800934
Comments:Amend FY19 PE Phase into the current STIP. No MPO
Indiana Department
of Transportation
SR 114 HMA Overlay,
Preventive
Maintenance
From I-65 to Iroquois River
Bridge
LaPorte 5.089 STP Road ROW RW $80,000.00 $20,000.00 $100,000.00A 31 $2,019,526.0040086 /
1593254
Comments:Amend FY19 ROW Phase into the current STIP. No MPO
Indiana Department
of Transportation
I 65 ITS Traffic
Management Systems
CCTV/DMS from US 24/231 (Exi
t 201) to SR 10
LaPorte 28.464 Interstate Statewide
Construction
CN $2,890,360.80 $321,151.20 $3,211,512.00 A 31 $3,511,512.0041233 /
1800573
Statewide
Consulting
PE $270,000.00 $30,000.00 $300,000.00
Comments:Amend FY 19 PE phase and FY 20 CN phase into the current STIP. No MPO.
Jasper County Total
Federal: $3,310,760.80 Match :$388,751.20 2018: 2019: $488,000.00 2020: $3,211,512.00 2021:
*Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not fiscally constrained and is for information purposes.
Page 17 of 37 Report Created:11/2/2018 2:09:58PM
State Preservation and Local Initiated Projects FY 2018 - 2021
Indiana Department of Transportation (INDOT)
SPONSOR CONTR
ACT # /
LEAD
DES
ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL
CATEGORY
PROGRAM PHASE FEDERAL MATCHEstimated
Cost left to
Complete
Project*
2018 2019 2020 2021STIP
NAME
Jennings County
North Vernon ST 1015 Road Rehabilitation (3
R/4R Standards)
Walnut Street (US 50) from 7th
Street to West Poplar Street
Seymour .379 STPBG 100% Local
Funds
PE $0.00 $178,669.06 $178,669.06A 31 $9,551,345.2840896 /
1702963
Group III Program PE $714,676.22 $0.00 $714,676.22
Comments:Adding PE to FY 2019. No MPO
Jennings County Total
Federal: $714,676.22 Match :$178,669.06 2018: 2019: $893,345.28 2020: 2021:
*Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not fiscally constrained and is for information purposes.
Page 18 of 37 Report Created:11/2/2018 2:09:58PM
State Preservation and Local Initiated Projects FY 2018 - 2021
Indiana Department of Transportation (INDOT)
SPONSOR CONTR
ACT # /
LEAD
DES
ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL
CATEGORY
PROGRAM PHASE FEDERAL MATCHEstimated
Cost left to
Complete
Project*
2018 2019 2020 2021STIP
NAME
Kosciusko County
Indiana Department
of Transportation
SR 13 Small Structure
Replacement
Carries Tennant Ditch, 5.67
Miles North of SR 14.
Fort Wayne 1.006 STPBG Bridge Consulting PE $328,000.00 $82,000.00 $410,000.00A 31 $2,787,466.0041552 /
1800015
Comments:MACOG Resolution 25-18. DES 1800015, 1800048, 1800184 Adding PE to FY 2019 into FY 2018 - 2021 STIP.
Kosciusko County Total
Federal: $328,000.00 Match :$82,000.00 2018: 2019: $410,000.00 2020: 2021:
*Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not fiscally constrained and is for information purposes.
Page 19 of 37 Report Created:11/2/2018 2:09:58PM
State Preservation and Local Initiated Projects FY 2018 - 2021
Indiana Department of Transportation (INDOT)
SPONSOR CONTR
ACT # /
LEAD
DES
ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL
CATEGORY
PROGRAM PHASE FEDERAL MATCHEstimated
Cost left to
Complete
Project*
2018 2019 2020 2021STIP
NAME
Lake County
Gary ST 1001 Road Reconstruction
(3R/4R Standards)
Ridge Road Reconstruction,
Connecticut St to Mississippi St
. Phase 2
LaPorte .89 STPBG Northwest Indiana
MPO
CN -$2,060,000.00 $0.00 ($5,060,000.00) $3,000,000.00A 31 $3,750,000.0034092 /
1172078
100% Local
Funds
CN $0.00 -$515,000.00 ($1,265,000.00) $750,000.00
Comments:MPO - CN decrease funds and change FY from 20 to 19
Resolution 18-14, Amendment 17
Gary ST 1013 New Signal
Installation
At intersection 15th Ave and
MLK Dr, multiple intersections
and 1 rail crossing
LaPorte .2 STPBG Northwest Indiana
MPO
RW -$160,000.00 $0.00 ($160,000.00) A 31 $1,096,000.0035799 /
0710064
100% Local
Funds
RW $0.00 -$40,000.00 ($40,000.00)
Comments:MPO - Request to remove all funds and eliminate project.
Resolution 18-14 Amendment 17
Gary IR 1025 Bike/Pedestrian
Facilities
Gary Green Links Trail Phase 3 LaPorte .75 STPBG Northwest Indiana
MPO
PE $300,000.00 $0.00 $300,000.00A 31 $1,650,000.0040646 /
1702158
100% Local
Funds
PE $0.00 $75,000.00 $75,000.00
Comments:MPO - Add PE phase FY19
Resolution 18-14 Amendment 17
Gary ST 1047 Road Reconstruction
(3R/4R Standards)
Industrial Highway Phase III.
Cline Ave to EJ&E RR Bridge
LaPorte 1.32 STPBG Northwest Indiana
MPO
RW $160,000.00 $0.00 $160,000.00 A 31 $5,471,000.0040733 /
1600418
100% Local
Funds
RW $0.00 $40,000.00 $40,000.00
Comments:MPO funds - add RW phase FY20
Resolution 18-14; Amend 17
Gary US 20 Enhancement Complete Streets
Enhancements
LaPorte .05 STPBG Road ROW RW $200,000.00 $0.00 $200,000.00A 31 $2,575,000.0041770 /
1801738
Northwest Indiana
MPO
CN $2,060,000.00 $0.00 $2,060,000.00
100% Local
Funds
CN $0.00 $515,000.00 $515,000.00
Comments:NIRPC MPO and State - RW State add phase FY19. CN MPO Add MPO funds FY19. Change project from State sponsor to Local
Lake County Total
Federal: $500,000.00 Match :$75,000.00 2018: 2019: $6,900,000.00 2020: -$6,325,000.00 2021:
*Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not fiscally constrained and is for information purposes.
Page 20 of 37 Report Created:11/2/2018 2:09:58PM
State Preservation and Local Initiated Projects FY 2018 - 2021
Indiana Department of Transportation (INDOT)
SPONSOR CONTR
ACT # /
LEAD
DES
ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL
CATEGORY
PROGRAM PHASE FEDERAL MATCHEstimated
Cost left to
Complete
Project*
2018 2019 2020 2021STIP
NAME
Madison County
Indiana Department
of Transportation
US 36 HMA Overlay,
Preventive
Maintenance
From ECL Fortville to N Jct SR 9
/SR 67
Greenfield 7.327 NHS Road Consulting PE $120,000.00 $30,000.00 $150,000.00A 31 $4,861,376.0040588 /
1701070
Road
Construction
CN $3,229,684.80 $807,421.20 $4,037,106.00
Bridge Consulting PE $32,000.00 $8,000.00 $40,000.00
Bridge
Construction
CN $507,416.00 $126,854.00 $634,270.00
Comments:Approved in MCCOG Resolution 13 --2018
Madison County Total
Federal: $3,889,100.80 Match :$972,275.20 2018: 2019: $190,000.00 2020: $4,671,376.00 2021:
*Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not fiscally constrained and is for information purposes.
Page 21 of 37 Report Created:11/2/2018 2:09:58PM
State Preservation and Local Initiated Projects FY 2018 - 2021
Indiana Department of Transportation (INDOT)
SPONSOR CONTR
ACT # /
LEAD
DES
ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL
CATEGORY
PROGRAM PHASE FEDERAL MATCHEstimated
Cost left to
Complete
Project*
2018 2019 2020 2021STIP
NAME
Monroe County
Indiana Department
of Transportation
SR 45 Intersect. Improv. W/
Added Turn Lanes
From 0.2 mi E of I-69 (Arlington)
to 0.93 mi E of I-69 (Kinser)
Seymour .821 NHPP Mobility Consulting PE $800,000.00 $200,000.00 $1,000,000.00A 31 $7,200,000.001700198
Mobility ROW RW $240,000.00 $60,000.00 $300,000.00
Comments:Amend PE and RW to current STIP. Amended to BMCMPO TIP per Adoption Resolution dated 9/14/18.
Indiana Department
of Transportation
SR 46 Intersect. Improv. W/
Added Turn Lanes
Intersection of SR 46 and 14th
Street in Bloomington
Seymour 0 NHPP Mobility ROW RW $8,000.00 $2,000.00 $10,000.00A 31 $2,647,850.0041349 /
1801525
Mobility
Construction
CN $2,118,280.00 $529,570.00 $2,647,850.00
Comments:Amend RW and CN phase to the current STIP. Amended to BMCMPO's TIP per Adoption Resolution 2019-01 dated 9/14/18.
Indiana Department
of Transportation
SR 45 Intersect. Improv. W/
Added Turn Lanes
At the intersection of Pete Ellis
Dr
Seymour 0 STP Safety ROW RW $80,000.00 $20,000.00 $100,000.00 A 31 $2,424,267.0041465 /
1800199
Safety Consulting PE $490,760.00 $122,690.00 $613,450.00
Comments:Amend PE and RW to current STIP. Amended to BMCMPO's TIP per Adoption Resolution 2019-01 dated 9/14/18.
Indiana Department
of Transportation
SR 45 Intersect. Improv. W/
Added Turn Lanes
Intersection of SR 45/West Ison
Rd and SR 45/South Bunger Rd
.
Seymour .285 NHPP Safety ROW RW $20,000.00 $5,000.00 $25,000.00 A 31 $968,224.0041515 /
1800198
Safety Consulting PE $100,000.00 $25,000.00 $125,000.00
Comments:Amend PE and RW to current STIP. Amended to BMCMPO's TIP per Adoption Resolution 2019-01 dated 9/14/18.
Monroe County Total
Federal: $3,857,040.00 Match :$964,260.00 2018: 2019: $1,748,450.00 2020: $2,647,850.00 2021: $425,000.00
*Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not fiscally constrained and is for information purposes.
Page 22 of 37 Report Created:11/2/2018 2:09:58PM
State Preservation and Local Initiated Projects FY 2018 - 2021
Indiana Department of Transportation (INDOT)
SPONSOR CONTR
ACT # /
LEAD
DES
ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL
CATEGORY
PROGRAM PHASE FEDERAL MATCHEstimated
Cost left to
Complete
Project*
2018 2019 2020 2021STIP
NAME
Parke County
Indiana Department
of Transportation
US 41 Debris Removal From
Channel
over Sugar Mill Creek; 01.28 mi
N of SR 47
Crawfordsville 0 STPBG Bridge Consulting PE $86,400.00 $21,600.00 $108,000.00A 31 $609,888.0041411 /
1801304
Bridge
Construction
CN $401,510.40 $100,377.60 $501,888.00
Comments:TCAPC T-18-08 (DES 1801353, 1801344, 1801338); IMPO 18-IMPO-016 (DES 1801348); Add FY19 PE $108,000, Add FY20 CN $501,888
Parke County Total
Federal: $487,910.40 Match :$121,977.60 2018: 2019: $108,000.00 2020: $501,888.00 2021:
*Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not fiscally constrained and is for information purposes.
Page 23 of 37 Report Created:11/2/2018 2:09:58PM
State Preservation and Local Initiated Projects FY 2018 - 2021
Indiana Department of Transportation (INDOT)
SPONSOR CONTR
ACT # /
LEAD
DES
ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL
CATEGORY
PROGRAM PHASE FEDERAL MATCHEstimated
Cost left to
Complete
Project*
2018 2019 2020 2021STIP
NAME
Porter County
Portage ST 1012 Road Reconstruction
(3R/4R Standards)
Central Ave. reconstruction
from Lake/Porter Co. Line to
Willowcreek Road
LaPorte 2.08 DEM Demonstration
Fund Program
PE $56,085.00 $0.00 $56,085.00A 31 $3,406,085.0034496 /
1173430
Comments:NIRPC - Demo Funds - add PE phase to FY19
Resolution 18-10 amendment 13
Porter County Total
Federal: $56,085.00 Match :$0.00 2018: 2019: $56,085.00 2020: 2021:
*Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not fiscally constrained and is for information purposes.
Page 24 of 37 Report Created:11/2/2018 2:09:58PM
State Preservation and Local Initiated Projects FY 2018 - 2021
Indiana Department of Transportation (INDOT)
SPONSOR CONTR
ACT # /
LEAD
DES
ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL
CATEGORY
PROGRAM PHASE FEDERAL MATCHEstimated
Cost left to
Complete
Project*
2018 2019 2020 2021STIP
NAME
Putnam County
Indiana Department
of Transportation
US 40 Bridge Deck Overlay *closing out* Bridge over CSX
Railroad, 0.25 mi E of SR 243
Crawfordsville 0 STPBG Bridge Consulting PE -$270,400.00 -$67,600.00 ($78,000.00) ($260,000.00) A 311602006
Comments:No MPO; closing out project. remove FY18 PE $78,000, removed FY20 CN $260,000
Putnam County Total
Federal: -$270,400.00 Match :-$67,600.00 2018: -$78,000.00 2019: 2020: -$260,000.00 2021:
*Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not fiscally constrained and is for information purposes.
Page 25 of 37 Report Created:11/2/2018 2:09:58PM
State Preservation and Local Initiated Projects FY 2018 - 2021
Indiana Department of Transportation (INDOT)
SPONSOR CONTR
ACT # /
LEAD
DES
ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL
CATEGORY
PROGRAM PHASE FEDERAL MATCHEstimated
Cost left to
Complete
Project*
2018 2019 2020 2021STIP
NAME
Rush County
Indiana Department
of Transportation
VA VARI Railroad Protection Sexton St at CSX DOT 154203F
in Rushville;154202Y Harrison
St; 154204M Arthur St
Greenfield 0 Safety Local Safety
Program - 130
CN $1,213,677.00 $0.00 $1,213,677.00A 31 $1,213,677.0039444 /
1600445
Comments:No MPO - Adding RR CN FY 19 Federal 1,213,677.
Indiana Department
of Transportation
SR 3 Bridge Deck Overlay over Little Flatrock River, 1.46
miles S. of SR 244
Greenfield 0 NHS Bridge Consulting PE $34,400.00 $8,600.00 $43,000.00A 31 $463,660.0041191 /
1800335
Bridge
Construction
CN $336,528.00 $84,132.00 $420,660.00
Comments:District Bridge Project
Rush County Total
Federal: $1,584,605.00 Match :$92,732.00 2018: 2019: $1,256,677.00 2020: 2021: $420,660.00
*Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not fiscally constrained and is for information purposes.
Page 26 of 37 Report Created:11/2/2018 2:09:58PM
State Preservation and Local Initiated Projects FY 2018 - 2021
Indiana Department of Transportation (INDOT)
SPONSOR CONTR
ACT # /
LEAD
DES
ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL
CATEGORY
PROGRAM PHASE FEDERAL MATCHEstimated
Cost left to
Complete
Project*
2018 2019 2020 2021STIP
NAME
Shelby County
Indiana Department
of Transportation
VA VARI Railroad Protection CR 500 E at CSX RR DOT #154
228B in Morristown
Greenfield 0 Safety Local Safety
Program - 130
CN $461,132.00 $0.00 $461,132.00A 31 $461,132.0039446 /
1600447
Comments:NO MPO - add RR CN FY 19 461,132.
Shelby County Total
Federal: $461,132.00 Match :$0.00 2018: 2019: $461,132.00 2020: 2021:
*Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not fiscally constrained and is for information purposes.
Page 27 of 37 Report Created:11/2/2018 2:09:58PM
State Preservation and Local Initiated Projects FY 2018 - 2021
Indiana Department of Transportation (INDOT)
SPONSOR CONTR
ACT # /
LEAD
DES
ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL
CATEGORY
PROGRAM PHASE FEDERAL MATCHEstimated
Cost left to
Complete
Project*
2018 2019 2020 2021STIP
NAME
Spencer County
Santa Claus VA 1016 Bike/Pedestrian
Facilities
Lincoln Boyhood-Santa Claus
Discovery Trail
Vincennes 0 STPBG Local Trans
Enhancement
Program
CN $0.00 $0.00 $80,000.00 ($80,000.00)A 31 $1,785,000.0036122 /
1297252
Local
Transportation
Alternatives
CN -$1,716,511.34 $0.00 $1,268,000.00 ($2,984,511.34)
100% Local
Funds
CN $0.00 -$573,277.83 $337,000.00 ($910,277.83)
Comments:Amend 2018-2021 STIP. Removed all CN from FY19 and added FY20 CN Federal $1,268,000.00, FY20 CN Federal $80,000.00, FY20 CN Local $337,000.00. No MPO.
Santa Claus ST 1023 Bike/Pedestrian
Facilities
Eastside Trail:Trail connecting
Ray Yellig Park Trail to
American Discovery Trai
Vincennes 1 STPBG Local Trans
Enhancement
Program
CN $961,696.00 $0.00 $1,320,000.00($358,304.00)A 31 $1,794,480.0041722 /
1383661
Local Trans
Enhancement
Program
RW $100,000.00 $0.00 $100,000.00
100% Local
Funds
CN $0.00 $180,904.00 $330,000.00($149,096.00)
100% Local
Funds
RW $0.00 $25,000.00 $25,000.00
Comments:Amend 2018-2021 STIP. Adding FY19 RW Federal $100,000.00, FY19 RW Local $25,000.00, and removing FY19 CN Federal by $358304.00 and removing CN Local $148,096.00. Adding FY21 CN Federal $1,320,000.00 and FY21 CN Local $330,000.00. No MPO.
Spencer County Total
Federal: -$654,815.34 Match :-$367,373.83 2018: 2019: -$4,357,189.17 2020: $1,685,000.00 2021: $1,650,000.00
*Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not fiscally constrained and is for information purposes.
Page 28 of 37 Report Created:11/2/2018 2:09:58PM
State Preservation and Local Initiated Projects FY 2018 - 2021
Indiana Department of Transportation (INDOT)
SPONSOR CONTR
ACT # /
LEAD
DES
ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL
CATEGORY
PROGRAM PHASE FEDERAL MATCHEstimated
Cost left to
Complete
Project*
2018 2019 2020 2021STIP
NAME
Tipton County
Indiana Department
of Transportation
SR 28 Bridge Deck Overlay over Dixon Creek, 3.75 miles W
of US 31
Greenfield 0 STP Bridge Consulting PE $48,000.00 $12,000.00 $60,000.00A 31 $561,427.0041193 /
1800333
Bridge
Construction
CN $401,141.60 $100,285.40 $501,427.00
Comments:District Bridge Project.
Tipton County Total
Federal: $449,141.60 Match :$112,285.40 2018: 2019: $60,000.00 2020: 2021: $501,427.00
*Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not fiscally constrained and is for information purposes.
Page 29 of 37 Report Created:11/2/2018 2:09:58PM
State Preservation and Local Initiated Projects FY 2018 - 2021
Indiana Department of Transportation (INDOT)
SPONSOR CONTR
ACT # /
LEAD
DES
ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL
CATEGORY
PROGRAM PHASE FEDERAL MATCHEstimated
Cost left to
Complete
Project*
2018 2019 2020 2021STIP
NAME
Union County
Indiana Department
of Transportation
SR 101 Bridge Deck Overlay over Hannah Creek, 3.78 miles
S. of US 27
Greenfield 0 STP Bridge
Construction
CN $659,725.60 $164,931.40 $824,657.00 A 31 $907,657.0041194 /
1800320
Bridge Consulting PE $66,400.00 $16,600.00 $83,000.00
Comments:District Bridge Project
Union County Total
Federal: $726,125.60 Match :$181,531.40 2018: 2019: $83,000.00 2020: 2021: $824,657.00
*Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not fiscally constrained and is for information purposes.
Page 30 of 37 Report Created:11/2/2018 2:09:58PM
State Preservation and Local Initiated Projects FY 2018 - 2021
Indiana Department of Transportation (INDOT)
SPONSOR CONTR
ACT # /
LEAD
DES
ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL
CATEGORY
PROGRAM PHASE FEDERAL MATCHEstimated
Cost left to
Complete
Project*
2018 2019 2020 2021STIP
NAME
Vanderburgh County
Evansville ST 1 Road Reconstruction
(3R/4R Standards)
Walnut Street from US 41 to
Lincoln Park Drive - Phase I
Vincennes 2.07 Multiple Evansville MPO -
PYB
CN $512,858.00 $0.00 $512,858.00 A 31 $4,106,451.0040124 /
1700400
Evansville MPO CN $1,868,302.00 $0.00 $1,868,302.00
100% Local
Funds
CN $0.00 $595,291.00 $595,291.00
Comments:Amend 2018-2021 STIP. Adding FY20 CN Local $595,291.00. FY20 CN MPO $1,868,302.00, FY20 CN MPO $512,858.00. Per MPO TIP Mod Letter dated 8/10/2018.
Evansville ST 1 Road Reconstruction
(3R/4R Standards)
Walnut St. from Lincoln Park Dr.
to Vann Ave. includes trail
connection to State Hospital.
Vincennes 0 Multiple Evansville MPO CN $2,522,000.00 $0.00 $2,522,000.00 A 31 $3,602,500.0041598 /
1801727
100% Local
Funds
CN $0.00 $630,500.00 $630,500.00
Comments:Amend 2018-2021 STIP. Adding FY21 CN MPO $2,522,000.00, FY21 CN Local $630,500.00 per EMPO TIP Mod Letter dated 8/10/2018.
Vanderburgh County Total
Federal: $4,903,160.00 Match :$1,225,791.00 2018: 2019: 2020: $2,976,451.00 2021: $3,152,500.00
*Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not fiscally constrained and is for information purposes.
Page 31 of 37 Report Created:11/2/2018 2:09:58PM
State Preservation and Local Initiated Projects FY 2018 - 2021
Indiana Department of Transportation (INDOT)
SPONSOR CONTR
ACT # /
LEAD
DES
ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL
CATEGORY
PROGRAM PHASE FEDERAL MATCHEstimated
Cost left to
Complete
Project*
2018 2019 2020 2021STIP
NAME
Various County
Indiana Department
of Transportation
VA VARI Raised Pavement
Markings,
Refurbished
Various Locations Within the
Fort Wayne District.
Fort Wayne 0 Safety Safety
Construction
CN $262,300.00 $65,575.00 $327,875.00 A 31 $327,875.0041065 /
1800940
Comments:NO MPO. Adding CN to FY 2021 into FY 2018 - 2021 STIP.
Indiana Department
of Transportation
VA VARI ITS Traffic
Management Systems
Greenfield & Seymour District
Signal Controller/Communicatio
ns Upgrade in FY 20
Greenfield 0 Multiple Statewide
Consulting
PE $104,000.00 $26,000.00 $130,000.00A 31 $1,572,421.0041232 /
1800945
Statewide
Construction
CN $1,153,936.80 $288,484.20 $1,442,421.00
Comments:Amend FY 19 PE phase and FY 20 CN phase into the current STIP. No MPO.
Indiana Department
of Transportation
VA VARI ITS Devices
Maintenance
Contracts
Greenfield & Crawfordsville
District ITS & Signal
Maintenance Contract - FY 20
Multiple Districts 0 Multiple Statewide
Consulting
PE $0.00 $30,000.00 $30,000.00A 31 $419,584.0041255 /
1800906
Statewide
Construction
CN $0.00 $389,584.00 $389,584.00
Comments:Amend FY 19 PE phase and FY 20 CN phase into the current STIP. No MPO.
Indiana Department
of Transportation
VA VARI ITS Devices
Maintenance
Contracts
Fort Wayne & LaPorte District
ITS & Signal Maintenance
Contract - FY 20
Multiple Districts 0 Multiple Statewide
Construction
CN $0.00 $388,558.00 $388,558.00 A 31 $418,558.0041256 /
1801342
Statewide
Consulting
PE $0.00 $30,000.00 $30,000.00
Comments:Amend FY 19 PE phase and FY 20 CN phase into the current STIP. No MPO.
Indiana Department
of Transportation
VA VARI ITS Devices
Maintenance
Contracts
Seymour & Vincennes District
ITS & Signal Maintenance
Contract - FY 20
Multiple Districts 0 Multiple Statewide
Construction
CN $0.00 $194,279.00 $194,279.00 A 31 $209,279.0041257 /
1801343
Statewide
Consulting
PE $0.00 $15,000.00 $15,000.00
Comments:Amend FY 19 PE phase and FY 20 CN phase into the current STIP. No MPO.
Indiana Department
of Transportation
VA VARI Install New Guard Rail Various locations adding
guardrail or closing gaps in
existing guardrail. See Project
Greenfield 0 Multiple District Other
Consulting
PE $22,604.80 $5,651.20 $28,256.00A 31 $314,256.0041662 /
1801832
District Other
Construction
CN $228,800.00 $57,200.00 $286,000.00
Comments:New Guardrail in various locations throughout the District.
Indiana Department
of Transportation
VA VARI District Wide Bridge
Maintenance
IDIQ, Various locations
throughout the Seymour District
Seymour 0 STP Bridge
Construction
CN $800,000.00 $200,000.00 $1,000,000.00A 31 $1,000,000.0041681 /
1801948
Comments:Amend CN to the current STIP. Amended to KIPDA's TIP per Administrative Modification 21 dated 9/27/18. Amended to CAMPO's TIP per Resolution 2018-12 dated 10/4/18, and OKI'sTIP per Administrative Modification 12 dated 10/9/18. Submitted for inclusion in all TIP's in Seymour District.
Indiana Department
of Transportation
VA 1019 Patch And Rehab
Pavement
IDIQ Various Locations
Throughout the LaPorte District
LaPorte 0 NHPP Road
Construction
CN $0.00 $1,000,000.00 $1,000,000.00A 31 $1,000,000.0041687 /
1801958
Comments:Amend FY19 CN Phase into the current STIP, This is 100% state funds.
Indiana Department
of Transportation
VA 1019 District Wide Bridge
Maintenance
IDIQ Various Locations
Throughout the LaPorte District
LaPorte 0 NHPP Bridge
Construction
CN $800,000.00 $200,000.00 $1,000,000.00A 31 $1,000,000.0041688 /
1801959
Comments:MACOG approved 10/10/18 Resolution 26-18. This is also going through NIRPC approval.
*Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not fiscally constrained and is for information purposes.
Page 32 of 37 Report Created:11/2/2018 2:09:58PM
State Preservation and Local Initiated Projects FY 2018 - 2021
Indiana Department of Transportation (INDOT)
SPONSOR CONTR
ACT # /
LEAD
DES
ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL
CATEGORY
PROGRAM PHASE FEDERAL MATCHEstimated
Cost left to
Complete
Project*
2018 2019 2020 2021STIP
NAME
Various County Total
Federal: $3,371,641.60 Match :$2,890,331.40 2018: 2019: $3,519,256.00 2020: $2,414,842.00 2021: $327,875.00
*Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not fiscally constrained and is for information purposes.
Page 33 of 37 Report Created:11/2/2018 2:09:58PM
State Preservation and Local Initiated Projects FY 2018 - 2021
Indiana Department of Transportation (INDOT)
SPONSOR CONTR
ACT # /
LEAD
DES
ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL
CATEGORY
PROGRAM PHASE FEDERAL MATCHEstimated
Cost left to
Complete
Project*
2018 2019 2020 2021STIP
NAME
Vermillion County
Indiana Department
of Transportation
US 36 Bridge Painting @ Wabash River; 01.79 mi E of
SR 63
Crawfordsville 0 STPBG Bridge Consulting PE $4,800.00 $1,200.00 $6,000.00A 31 $2,678,971.0040942 /
1800417
Comments:No MPO; Add FY19 PE $6,000
Vermillion County Total
Federal: $4,800.00 Match :$1,200.00 2018: 2019: $6,000.00 2020: 2021:
*Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not fiscally constrained and is for information purposes.
Page 34 of 37 Report Created:11/2/2018 2:09:58PM
State Preservation and Local Initiated Projects FY 2018 - 2021
Indiana Department of Transportation (INDOT)
SPONSOR CONTR
ACT # /
LEAD
DES
ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL
CATEGORY
PROGRAM PHASE FEDERAL MATCHEstimated
Cost left to
Complete
Project*
2018 2019 2020 2021STIP
NAME
Warren County
Indiana Department
of Transportation
SR 28 Bridge Thin Deck
Overlay
Eliminating - Bridge over
Goodwine Creek (Johnson
Branch), 0.18 mi W of SR 263
Crawfordsville 0 STPBG Bridge
Construction
CN -$39,200.00 -$9,800.00 ($49,000.00) A 31 $0.001602070
Comments:No MPO; removed FY20 funding. Eliminating project.
Warren County Total
Federal: -$39,200.00 Match :-$9,800.00 2018: 2019: 2020: -$49,000.00 2021:
*Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not fiscally constrained and is for information purposes.
Page 35 of 37 Report Created:11/2/2018 2:09:58PM
State Preservation and Local Initiated Projects FY 2018 - 2021
Indiana Department of Transportation (INDOT)
SPONSOR CONTR
ACT # /
LEAD
DES
ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL
CATEGORY
PROGRAM PHASE FEDERAL MATCHEstimated
Cost left to
Complete
Project*
2018 2019 2020 2021STIP
NAME
Wayne County
Indiana Department
of Transportation
US 40 Concrete Pavement
Restoration (CPR)
from 0.15 mi W of I-70 to 0.18
mi E of I-70 (Indiana/Ohio Ln)
Greenfield .33 STPBG Road Consulting PE $48,240.00 $12,060.00 $60,300.00A 31 $372,207.0040615 /
1700904
Road
Construction
CN $80,800.00 $20,200.00 $101,000.00
Comments:PE added for Consultant design
Wayne County Total
Federal: $129,040.00 Match :$32,260.00 2018: 2019: $60,300.00 2020: 2021: $101,000.00
*Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not fiscally constrained and is for information purposes.
Page 36 of 37 Report Created:11/2/2018 2:09:58PM
State Preservation and Local Initiated Projects FY 2018 - 2021
Indiana Department of Transportation (INDOT)
SPONSOR CONTR
ACT # /
LEAD
DES
ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL
CATEGORY
PROGRAM PHASE FEDERAL MATCHEstimated
Cost left to
Complete
Project*
2018 2019 2020 2021STIP
NAME
White County
Indiana Department
of Transportation
SR 18 Bridge Thin Deck
Overlay
Eliminating - Bridge over
Vanatta Ditch, 0.80 mi W of US
231
Crawfordsville 0 STPBG Bridge
Construction
CN -$33,600.00 -$8,400.00 ($42,000.00) A 31 $0.001602050
Comments:No MPO; removed FY20 CN funds. Eliminating project.
Indiana Department
of Transportation
US 24 Replace
Superstructure
Us [email protected] Ditch, 00.71mi
W US 421
LaPorte 0 NHPP Bridge Consulting PE $64,000.00 $16,000.00 $80,000.00A 31 $996,878.001703039
Comments:Amend FY19 PE Phase into the current STIP. No MPO
White County Total
Federal: $30,400.00 Match :$7,600.00 2018: 2019: $80,000.00 2020: -$42,000.00 2021:
Grand Total
Federal: $33,339,560.48 2019: $10,716,753.112018: -$78,000.00 2021: $16,284,853.002020: $15,993,633.00Match : $9,577,678.63
*Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not fiscally constrained and is for information purposes.
Page 37 of 37 Report Created:11/2/2018 2:09:58PM