Why do Data Warehouse Projects struggle ?
Gartner notes that over 50% of data warehouse projects fail or go wildly over budget
1. Inaccurate business requirements - #1 problem IDC
2. Poor development productivity
3. Slow development cycles
4. High cost of resources
5. High TCO
6. Poor documentation – usually the last thing that is considered &
never up to date.
7. Poor data quality
8. HIGH RISK
3
Where did they go wrong? – one real problem is the “Big Bang” project approach
“Incremental Incremental Data Warehouse Development –
The Only Way to Fly” Bill Inmon, Jan 8, 2009, (BeyeNetwork)– “There are many reasons the ‘Big Bang’ approach doesn’t work … “but at the heart is inability of the
development analyst to gather requirements in the manner prescribed by the SDLC”– “End users of analytical systems need to know what the possibilities are before they can articulate the
requirements.”
The goal is NOT to build a Data Warehouse, but rather…– Deliver real valueDeliver real value– Create a solution that is adaptable becauseCreate a solution that is adaptable because responding quickly to change brings competitive advantage
– Create a process Create a process to develop and maintain the solution that is trustworthy and sustainable
4
How would agile proponents approach the problem? From the agile manifesto: //agile
• Early, frequent, and continuous test and delivery of valuablevaluable working working software (every 2 wks-2mos).
• Welcome changing requirementsWelcome changing requirements, even late in development. • Business people, developers work together daily work together daily throughout the project.• Build projects around motivated individualsmotivated individuals. Give them the environment and
support they need, and trust them to get the job done. • The most efficient, effective method of conveying information to and within a
development team is face-to-faceface-to-face conversation. • Continuous attention to technical excellence technical excellence and good design good design enhances
agility. • Simplicity--the art of maximizing the amount of work not donemaximizing the amount of work not done--is essential. • At regular intervals, the team reflects the team reflects on how to become more effective, then
tunes and adjusts its behavior accordingly.
5
What is uncomfortable about this approach?
• The further out in time, the less a project team can say about what will be accomplished.
• An agile approach can break the rules.– Agile implementers sometimes wrongly assume you can break ANY rule.– Shortcuts do not equal Quality Pragmatism
• Classic trade-offs for project managers - Schedule/ Scope/ Resources/ Quality – agile leaves little wiggle room.
• Does not lend itself to outsourcing, distributed teams.• Having a close working relationship with business users does not solve
the difficulty determining requirements.
And ….
6
If I could deliver something meaningful in weeks
DON’T YOU THINK I WOULD HAVE, ALREADY.
7
Agile Approach Versus Traditional Approach
Docs?
8
What really works using agile “The WhereScape Way”
• A Governance structure – Strategy, Architecture, Roadmap, Standards– Goals, sponsors, infrastructure, data governance ….
• New Development Paradigm for delivering data - RED– ETL tools are great for moving data, but RED can do DW part better.– Integrated Development using one metadata driven tool.– Do the data delivery in the database.– Incorporate Business Rules into data delivery process
• Iterative workshops with business users– Use REAL DATA for flushing out requirements (RED enables this)– Track all issues discovered, especially data quality
9
Agile in Operation
• Integrate analysis, design, creation, data delivery, deployment, iteration
• Useful even if you just need to provide the presentation layer
• Feedback from business users on live data part of the development process
Live Data Workshop
Business UserSessions
10
Speeding up the development by leveraging metadata, embedding best practice methods
dim_customer_key
dss_update_time
11
Data Warehouse Scenario – Build a Sales Fact
12
Star schema creation scenario – start with load table
SourceWarehouse
Oracle, SQL/Server, Teradata, DB2Oracle, SQL/Server, Teradata, DB2Native RDBMS, ODBC accessible, FilesNative RDBMS, ODBC accessible, Files
13
RED Browser Mode
Metadata
Results
ActionsDrag and Drop Target Area
BrowsingConnections
Choose connection and filtering
14
For the Teradata shop -
15
Star schema creation scenario – start with load table
SourceWarehouse
Oracle, SQL/Server, Teradata, DB2Oracle, SQL/Server, Teradata, DB2Native RDBMS, ODBC accessible, FilesNative RDBMS, ODBC accessible, Files
16
Drag and Drop Example: load source data
17
Drag and Drop Example: load table properties
18
Drag and Drop Example: load table storage mapping
19
Drag and Drop Example: load table “create and load”
metadata
20
Drag and Drop Example: load table results
create
generated load script execution
21
Drag and Drop Example: load table results
create
generated load script execution
Display Data
22
Stage table creation scenario – the stage table
SourceWarehouse
Foreign dimension Keys, lookups
Source table join
23
Stage table: start with load_order_header (Drag and Drop)
24
Add columns from load_order_line (Drag and Drop)
Load_order_headerColumn metadata
25
Add columns from load_order_line (Drag and Drop)prevents duplicate column names
Load_order_headerColumn metadata
26
Add FK cols to Stage Table – Drag and Drop dim_*
Drag and drop Dimension table keys
27
Column Metadata easily altered
28
Column Transformations – Business Rules, Computed Fields, String Manipulation, Type Conversion, Null handling,…
29
Create the Stage Table (right click object)
30
Create the update procedure (object Properties)
31
…then select Procedure Type
32
… then specify the Join statement
add appropriate clauses
Numerous joins supported
33
…indicate the business key to identify SK in DimensionPrompts if column names match
34
…indicate the join column if names are different
35
Procedure is created, compiled. Execute Procedure.
36
Display Data
37
Fact table creation scenario – Sales Fact table
SourceWarehouse
38
Create the Fact Table from the Stage table
39
Metadata leveraged to create the code
Dimension tables are created with
“zero” row for unknowns
Join metadata
Transformation for quantity column
40
Auto generated stored procedure code …
• Keeps all the data movement in the database• Provides consistent variable naming, coding best practices• Utilizes custom parameters you can embed in metadata• Includes error checking and rollbacks• Preserves the metadata for easy modification• Can augment with custom procedures• Includes features best practices for various object types
o Can handle slowly changing dimensions (all three types)o Procedure provided to populate and update time dimensiono Handles code for surrogate keys, update and life-span dateso Creates Unknown Row for each dimension tableo Accounts for missing dimension key matches in source data
Let’s advance developers can skip the mundane
Allows less experienced developers to be productive
41
Generated Procedures with version compares
42
Next Step – Business User review
Easy vehicles to show this to Business users:
Output table data to Excel
Stress test with SSAS cube
43
Create a SSAS Cube for Business User EvalDrag and Drop Fact to OLAP Cube target
Creates OLAP dimensions
Creates OLAP measure group
44
Create a SSAS Cube for Business User EvalSlice and Dice in Analysis Services
45
Capturing Metadata - Lineage information
46
Leveraging Metadata: Reports
47
Ready to Deploy
48
Scheduler to manage objects and data flow
Run in parallel
49
Scheduler to manage objects and data flow
Run in parallel
50
Diagrammatical View Example: Update Job
51
Application Files to promote to QA and Production
52
Leveraging Metadata: Auto Producing Documentation
53
User Documentation
Where RED fits
55
"WhereScape promised a lot and the product has delivered. We are very happy with the amount of time it is saving us in development, as well as the documentation it is producing and the built-in scheduler. I am very happy with the purchase.“
"We estimate the development lifecycle is 20-25% of what it was previously when we were hand-codingWe estimate the development lifecycle is 20-25% of what it was previously when we were hand-coding."."
Dan Mosher, Director of Enterprise Data Warehousing
“WhereScape RED offers IPC a sophisticated Lifecycle Methodology sophisticated Lifecycle Methodology that guides us through the process of building our data warehouse. RED
creates integrated database objects such as tables, indexes, procedures, etc; produces standard yet customizable T-SQL code and
auto-generated user and technical documentation.”
Maylee Sanchez, Sr. Database Administrator
Some WhereScape Customers
57
58
ConclusionConclusion
• Build Your Data Warehouse Solution
– Way Faster– Way Cheaper– Ready for Change
• Get Full Documentation– For Users– For Techies
• And DO IT THE AGILE WAY
60
Tools and Reports
61
Additional CUBE Features
• Can add MDX calculations to the cube metadata for calculated members
– Specify font, foreground/background colors, boldness, display format, non-empty behavior, order number, client visibility
• Canned MDX calculations – Month/Year to date, Moving Qtr/Year, same month previous year, previous year to date.
• Can specify Post Create or Post Update XML/A Scripts– Allows features built outside of RED to be added to the Schedule cube processing (e.g. security roles added,
perspectives, translations )
• Cube properties include – Processing modes for Cubes (Regular, Lazy Aggregation) and priority– OLAP dimension processing (together or separately)– Cube visibility to client applications– Default Measure and estimated rows
• Can optionally drop Dimensions, Measure Groups, Cubes, and Cube databases from within RED.
• Can manage KPIs, partitioning, and processing for measure groups