AN 19-17-H780 Application-note SAN SEVERO Double Busbar 400 kV Substation Erection & Commissioning for Siemens Terna Entrance to the station: Larino FG line Aerial view 400kV double busbar Incoming HV line The 400MW Power Plant of San Severo (FG) is connected to the 400kV grid of RTN (TERNA) with a new double busbar 400kV switching substation provided by Siemens to TERNA. SAET as partner of Siemens provided the erection and commissioning of the substation due to the long experience as erection company for TERNA. SAET is qualified supplier of TERNA (LESC02, HV substation) with more than 100 bays erection in 400kV-245kV- 170/150kV. Regard to the 400kV section SAET run installation of HV equipment complete of supports and HV connection, moreover the assembling and erection of OHL portal and interconnection to the grid. Erection of OHL portal For the MV section SAET has installed the MV panels complete with cables and 20/0,4kV transformers. Regarding the LV section SAET installed control kiosk complete with bays control and protection panels, substation building complete with distribution, control and communication panels and auxiliaries room. Laying, connection of distribution, control and communication cables and related MV-LV terminals. Finishing of the delivery building and substations auxiliaries room, complete of utility systems. SAET during final operations and commissioning for SCADA also gave technical assistance to Siemens, TERNA’s direct supplier for SET bid. Overview of Power Plant SAET S.p.A. – Via Moravia 8 35030 SELVAZZANO D. (PD) Telefono +39(0)49.8989711 Fax +39(0)49.8975299 Incoming HV line bay from ENPLUS Power Plant E-mail: [email protected] – Internet: www.saetpd.it

AN 19-10-H780 SAN SEVERO Terna double busbar 400 kV Substa

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

AN 19-17-H780 Application-note

SAN SEVERO Double Busbar 400 kV Substation Erection & Commissioning for Siemens Terna

Entrance to the station: Larino FG line Aerial view 400kV double busbar Incoming HV line

The 400MW Power Plant of San Severo (FG) is connected to the 400kV grid of

RTN (TERNA) with a new double busbar 400kV switching substation provided by

Siemens to TERNA. SAET as partner of Siemens provided

the erection and commissioning of the substation due to the long experience

as erection company for TERNA. SAET

is qualified supplier of TERNA (LESC02, HV substation) with more than 100

bays erection in 400kV-245kV-170/150kV.

Regard to the 400kV section SAET run installation of HV equipment complete

of supports and HV connection, moreover the assembling and erection

of OHL portal and interconnection to

the grid.

Erection of OHL portal

For the MV section SAET has installed the MV panels complete with cables

and 20/0,4kV transformers. Regarding the LV section SAET

installed control kiosk complete with bays control and protection panels,

substation building complete with distribution, control and

communication panels and auxiliaries

room. Laying, connection of distribution,

control and communication cables and related MV-LV terminals.

Finishing of the delivery building and substations auxiliaries room, complete

of utility systems. SAET during final operations and

commissioning for SCADA also gave

technical assistance to Siemens, TERNA’s direct supplier for SET bid.

Overview of Power Plant

SAET S.p.A. – Via Moravia 8 35030 SELVAZZANO D. (PD)

Telefono +39(0)49.8989711 Fax +39(0)49.8975299

Incoming HV line bay from ENPLUS Power Plant E-mail: [email protected] – Internet: www.saetpd.it