Amendment in EC Condition of Kharai Harudi Mining Project (ML Area: 2831.61 ha)
At Villages: Kharai, Jadva, Vaghapadhar & Harudi, Tehsil: Lakhpat & Abdasa, District: Kachchh (Gujarat)
Form – 1
M/s. UltraTech Cement Ltd. 1
(Unit: Sewagram Cement Works)
FORM-1
(I) Basic Information
S.
No.
Item Details
1 Name of the project/s Amendment in EC Condition of Kharai Harudi
Mining Project (ML Area: 2831.61 ha) at Villages:
Kharai, Jadva, Vaghapadhar & Harudi, Tehsil: Lakhpat
& Abdasa, District: Kachchh (Gujarat)
2 S. No. in the schedule As per EIA Notification dated 14th September 2006, as
amended from time to time, this project falls under
S.No. 1, Category “A”, Project or Activity 1(a) – (3)
3 Proposed capacity/area/length/tonnage
handled/command area/lease/number of
wells to be drilled
Existing Capacity: 6.8 MTPA
ML Area: 2831.61 ha
This is an existing mine and amendment is proposed
in EC Condition only.
4 New/Expansion /Modernization The proposal is for amendment in specific condition
stipulated in Environmental clearance granted by
MoEF, New Delhi for the project vide their letter No. J-
11015/390/ 2008-IA.II (M) dated 22nd February,
2011 & letter dated 22nd August, 2014.
5 Existing Capacity /Area etc. � ML area: 2831.61 ha
� Limestone Production: 6.8 MTPA
6 Category of Project i.e.' A' or 'B' ‘A’
7 Does it attract the general condition? If
yes, please specify.
Yes, Narayan Sarovar Wildlife Sanctuary is located at
a distance of 4.80 Km from Mine Lease area.
8 Does it attract the specific condition? If
yes, please specify.
No
9 Location -
Plot/Survey/Khasra No Khasra Details enclosed as Annexure-1
Villages Kharai, Jadva, Vaghapadhar and Harudi
Tehsil Lakhpat and Abdasa
District Kutch
State Gujarat
10 Nearest railway station/airport along with
distance in kms
� Nearest Railway Station: Bhuj railway station,
approx 99 km in SE direction from mine site.
� Nearest Airport – Bhuj Airport, approx 99 km in
SE direction from mine site.
11 Nearest Town, city, District Headquarters � Nearest Town: Lakhpat (~30 km in NE direction).
Amendment in EC Condition of Kharai Harudi Mining Project (ML Area: 2831.61 ha)
At Villages: Kharai, Jadva, Vaghapadhar & Harudi, Tehsil: Lakhpat & Abdasa, District: Kachchh (Gujarat)
Form – 1
M/s. UltraTech Cement Ltd. 2
(Unit: Sewagram Cement Works)
along with distance in kms. � Nearest City & District Headquarters: Bhuj (~99
Km in SE direction).
12 Village Panchayats Zilla Parishad,
Municipal Corporation, Local body
(complete postal addresses with
telephone nos. to be given)
� Village Kharai & Jadva Gram Panchayat, Jadva,
Tehsil-Lakhpat, District-Kutch, Gujarat.
� Village Harudi, Gram Panchayat, Baranda, Tehsil-
Lakhpat, District-Kutch, Gujarat.
� Village Vaghapadhar, Gram Panchayat, Fulray,
Tehsil-Abdasa, District-Kutch, Gujarat.
13 Name of the applicant M/s UltraTech Cement Limited (Unit : Sewagram
Cement Works)
14 Registered Address M/s UltraTech Cement Ltd, Ahura Centre, 1st floor,
‘A’ wing , Mahakali caves road, Andheri (E), Mumbai-
400 093
15 Address for correspondence Project Proponent EIA Consultant
Name Dr. K.V Reddy Shri B.R Taneja
Designation (Owner/ Partner/ CEO) Vice President &
Corporate Head
(Environment)
COO
Address ‘A’ wing, 1st floor, Ahura
Centre, Mahakali Caves
Road, Andheri-East
(Mumbai)
J. M. EnviroNet Pvt. Ltd.
1st & 2nd Floor, S.C.O.-16,
Sector- 10 A, Gurgaon
(Haryana)
Pin Code 400 093 122 001
E-mail kvijender.reddy@adityabi
rla.com
Telephone No 08424048990/ 022-
66917601
0124 – 3206559/
0124 – 4141029
Fax No 022-28244970 0124 – 4141029
16 Details of Alternative Sites examined, if
any. Location of these sites should be
shown on a toposheet.
This project involves site specific activity. Therefore,
no alternative site has been considered.
17 Interlinked Projects Integrated Cement Plant at village Vayur, Tehsil
Abdasa, District Kutch, Gujarat.
18 Whether separate application of
interlinked project has been submitted?
Existing EC letter No J-11011/398/2007-IA II (I)
dated 1st /4th August, 2008 and letter dated 15th
April, 2011 & 5th September, 2014
19 If yes, date of submission Existing EC letter No J-11011/398/2007-IA II (I)
Amendment in EC Condition of Kharai Harudi Mining Project (ML Area: 2831.61 ha)
At Villages: Kharai, Jadva, Vaghapadhar & Harudi, Tehsil: Lakhpat & Abdasa, District: Kachchh (Gujarat)
Form – 1
M/s. UltraTech Cement Ltd. 3
(Unit: Sewagram Cement Works)
dated 1st /4th August, 2008 and letter dated 15th
April, 2011 & 5th September, 2014
20 If no, reason -
21 Whether the proposal involves approval/
clearance under: if yes, details of the same
and their status to be given.
(a) The Forest (Conservation) Act 1980?
(b) The Wildlife (Protection) Act 1972?
(c) The C.R.Z Notification. 1991?
� No Forest Land is involved within the mining lease
area.
� Wildlife clearance issued by Chief Wildlife Warden
vide their letter no WLP/32/B/972-76/2013-14
Dated 08.05.2013. (Copy enclosed as Annexure-2).
� The project does not fall in the CRZ Area.
22 Whether there is any Government Order/
Policy relevant/ relating to the site?
No
23 Forest land involved (hectares) Nil
24 Whether there is any litigation pending
against the project and/ or land in which
the project is proposed to be set-up.
(a) Name of the Court
(b) Case No
(c) Orders/ Directions of the court, If any
and its relevance with the proposed
project
No
(II) Activity
1. Construction, operation or decommissioning of the Project involving actions, which
will cause physical changes in the locality (topography, land use, changes in water
bodies, etc.)
S. No Information/Checklist
confirmation
Yes/
No
Details thereof (with approximate
quantities/rates, wherever possible) with
source of information data
1.1 Permanent or temporary
change in land use, land
cover or topography
including increase in
intensity of land use (with
respect to local land
use plan)
Yes Total mining lease area is 2831.61 ha which
comprises of Government waste land (2649.39
ha) and Private agricultural land (182.22 ha).
Topography of the area is flat with minor
undulations.
At the conceptual stage, out of total ML Area
2831.61 ha, the excavated area due to mining
activity will be converted into water reservoir.
Green belt is being developed along the periphery
of the lease. 26 ha area is kept for mineral storage,
Amendment in EC Condition of Kharai Harudi Mining Project (ML Area: 2831.61 ha)
At Villages: Kharai, Jadva, Vaghapadhar & Harudi, Tehsil: Lakhpat & Abdasa, District: Kachchh (Gujarat)
Form – 1
M/s. UltraTech Cement Ltd. 4
(Unit: Sewagram Cement Works)
S. No Information/Checklist
confirmation
Yes/
No
Details thereof (with approximate
quantities/rates, wherever possible) with
source of information data
0.02 ha area under infrastructure and 1.40 ha area
under roads.
1.2 Clearance of existing land,
vegetation and buildings? No
No clearance of existing land vegetation and
buildings is required.
1.3 Creation of new land uses? Yes At the conceptual stage, out of total ML Area
2831.61 ha, the excavated area due to mining
activity will be converted into water reservoir.
Green belt is being developed along the periphery
of the lease. 26 ha area is kept for mineral storage,
0.02 ha area under infrastructure and 1.40 ha area
under roads.
1.4 Pre-construction investigations e.g.
bore houses, soil testing?
No Pre-construction investigations have already been
carried out and found satisfactory.
1.5 Construction works? No No additional construction works is proposed.
Existing infrastructure will be used. No new
building will be constructed. This is a case of
Amendment in EC condition only.
1.6 Demolition works? No No demolition works will be there.
1.7 Temporary sites used for
construction works or housing of
construction workers?
No
No temporary sites will be used for construction
works or housing of construction workers;
Facilities already exist within the mining lease
which are being used. This is a case of
Amendment in EC condition only.
1.8 Above ground buildings, structures
or earthworks including linear
structures, cut and fill or
excavations.
Yes Excavation during mining operation is being
carried out as per approved mining plan. Voids
are formed by excavation of mineral.
1.9 Underground works including
mining or tunneling?
No This is an opencast mine. No Underground works
including mining or tunneling required.
1.10 Reclamation works? Yes Reclamation work will be carried out as per
approved mining plan.
At the conceptual stage, out of total ML Area
2831.61 ha, the excavated area due to mining
activity will be converted into water reservoir.
Amendment in EC Condition of Kharai Harudi Mining Project (ML Area: 2831.61 ha)
At Villages: Kharai, Jadva, Vaghapadhar & Harudi, Tehsil: Lakhpat & Abdasa, District: Kachchh (Gujarat)
Form – 1
M/s. UltraTech Cement Ltd. 5
(Unit: Sewagram Cement Works)
S. No Information/Checklist
confirmation
Yes/
No
Details thereof (with approximate
quantities/rates, wherever possible) with
source of information data
Green belt is being developed along the periphery
of the lease. 26 ha area is kept for mineral storage,
0.02 ha area under infrastructure and 1.40 ha area
under roads.
1.11 Dredging? No There will be no dredging.
1.12 Offshore structures? No There are no offshore structures.
1.13 Production and manufacturing
processes?
Yes The mining is opencast by mechanized method
using surface miners without involving drilling &
blasting. Loader – Dumper combination is used in
loading. Limestone is transported from mining
face to captive cement plant by trucks & dumpers.
1.14 Facilities for storage of goods or
materials?
Yes Facilities for storage of goods and materials are
already available.
1.15 Facilities for treatment or
disposal of solid waste or liquid
effluents?
No No topsoil & overburden is envisaged during
mining operations. No wastewater is being
generated during mining operations.
1.16 Facilities for long term housing of
operational workers?
No Township is not proposed. Township for both
skilled and unskilled workers had been
constructed earlier for its integrated cement
plant.
1.17 New road, rail or sea traffic during
construction or operation?
No No new road, rail or sea traffic during construction
or operation.
1.18 New road, rail, air waterborne or
other transport infrastructure
including new or altered routes
and stations, ports, airports etc.?
No No new road, rail, air, waterborne or other
transport infrastructure including new or altered
routes and stations, ports, airports etc.
1.19 Closure or diversion of existing
transport routes or infrastructure
leading to changes in traffic
movements?
No No closure or diversion of existing transport
routes or infrastructure leading to changes in
traffic movements.
1.20 New or diverted transmission
lines or pipelines?
No No new or diverted transmission lines or pipelines
will be there.
1.21 Impoundment, damming, No No impoundment, damming, culverting,
Amendment in EC Condition of Kharai Harudi Mining Project (ML Area: 2831.61 ha)
At Villages: Kharai, Jadva, Vaghapadhar & Harudi, Tehsil: Lakhpat & Abdasa, District: Kachchh (Gujarat)
Form – 1
M/s. UltraTech Cement Ltd. 6
(Unit: Sewagram Cement Works)
S. No Information/Checklist
confirmation
Yes/
No
Details thereof (with approximate
quantities/rates, wherever possible) with
source of information data
culverting, realignment or other
changes to the hydrology of
watercourses or aquifers?
realignment or other changes to the hydrology of
watercourses or aquifers.
1.22 Stream crossings? Yes There are three seasonal drains in the western
portion of the lease area and one seasonal drain in
the eastern portion of the lease area. Appropriate
width barrier from the streams is left which is
being afforested. No modification/ diversion in
existing natural drainage pattern at any stage is
envisaged.
1.23 Abstraction or transfers of water
from ground or surface waters?
Yes Total water requirement of the project 204 KLD
sourced from its existing Desalination Plant.
1.24 Changes in water bodies or the
land surface affecting drainage or
run-off?
Yes There are three seasonal drains in the western
portion of the lease area and one seasonal drain in
the eastern portion of the lease area. No
modification/ diversion in existing natural
drainage pattern at any stage is envisaged. There
will be no changes in water bodies or the land
surface affecting drainage or run-off.
Appropriate width barrier from the water bodies
has been demarcated as “No Mining Zone” which
is being afforested.
1.25 Transport of personnel or
materials for construction,
operation or decommissioning?
Yes Limestone is transported from mining face to
captive cement plant by trucks & dumpers
through existing exclusive company’s road.
Staff vehicles are being provided to far away
commuters.
1.26 Long-term dismantling or
decommissioning or restoration
works?
No No long-term dismantling or decommissioning or
restoration works is required.
Greenbelt is being developed within the mining
lease area and along the boundary, which will
contribute in increasing the aesthetic beauty and
in reduction of pollution.
Amendment in EC Condition of Kharai Harudi Mining Project (ML Area: 2831.61 ha)
At Villages: Kharai, Jadva, Vaghapadhar & Harudi, Tehsil: Lakhpat & Abdasa, District: Kachchh (Gujarat)
Form – 1
M/s. UltraTech Cement Ltd. 7
(Unit: Sewagram Cement Works)
S. No Information/Checklist
confirmation
Yes/
No
Details thereof (with approximate
quantities/rates, wherever possible) with
source of information data
1.27 Ongoing activity during
decommissioning which could
have an impact on the
environment?
No There will be no impact on the environment due
to ongoing activity during decommissioning. This
is a case of Amendment in EC condition only.
1.28 Influx of people to an area in
either temporarily or
permanently?
Yes Temporary influx of people is there in the area.
1.29 Introduction of alien species? No There is no possible source for transportation of
vegetation by transport of material as excavated
limestone is being/ will only be transported
locally and dispatched to captive cement plant
located in nearby area. Plantation is being done as
per guidance of CPCB.
Every effort is being made to prevent inadvertent
entry of alien species through trucks, vehicles etc.
1.30 Loss of native species or genetic
diversity?
No Loss of native species or genetic diversity will not
be there as the project site is devoid of plantation
except small bushes.
1.31 Any other actions? No Nil.
2. Use of Natural resources for construction or operation of the Project (such as land, water,
materials or energy, especially any resources which are non-renewable or in short
supply):
S. No. Information/checklist
confirmation
Yes/
No
Details thereof (with approximate
quantities/rates, wherever possible) with
source of information data
2.1 Land especially undeveloped or
agricultural land (ha)
Yes The present land use of the ML area is as follows:
Type of Land Area (ha)
Private Agricultural Land 182.22
Government Waste Land 2649.39
Total 2831.61
No forest land is involved.
2.2 Water (expected source & competing users) unit: KLD.
Yes Total water requirement for the mining project is 204 KLD sourced from existing desalination plant.
This is a case of Amendment in EC condition, therefore no additional water requirement is
Amendment in EC Condition of Kharai Harudi Mining Project (ML Area: 2831.61 ha)
At Villages: Kharai, Jadva, Vaghapadhar & Harudi, Tehsil: Lakhpat & Abdasa, District: Kachchh (Gujarat)
Form – 1
M/s. UltraTech Cement Ltd. 8
(Unit: Sewagram Cement Works)
proposed.
2.3 Minerals (MT) No There is no requirement of mineral inputs as raw material for mining of limestone.
2.4 Construction material – stone, aggregates, sand/soil (expected
source – MT)
No No construction material required in mining of limestone.
2.5 Forests and timber (source – MT) No Not required
2.6 Energy including electricity and
fuels (source, competing users)
Unit: fuel (MT), energy (MW)
Yes Power requirement is sourced from captive
power plant. Diesel is required for operation of
mining machineries.
2.7 Any other natural resources (use appropriate standard units)
No None.
3. Use, storage, transport, handling or production of substances or materials, which could
be harmful to human health or the environment or raise concerns about actual or
perceived risks to human health.
S. No Information/Checklist
confirmation
Yes
/No
Details thereof (with approximate
quantities/rates, wherever possible)
with source of information data
3.1 Use of substances or materials, which are hazardous (as per
MSIHC rules) to human health or
the environment (flora, fauna, and
water supplies)
No No substances or materials will be used, which are hazardous to human health or the environment.
Safety will be ensured.
3.2 Changes in occurrence of disease
or affect disease vectors (e.g. insect or water borne diseases)
No This is a case of amendment in EC condition only,
therefore, no effect is envisaged
3.3 Affect the welfare of people e.g. by changing living conditions?
Yes The project provides direct employment opportunities for local people & indirect
employment will be generated due to mining activities.
The company has developed and will continue to do so in future, basic infrastructure and facilities
like roads, transportation, post-offices, primary
schools etc in nearby areas under CSR leading to an overall positive impact on the socio-economy
of the people.
3.4 Vulnerable groups of people who
could be affected by the project e.g. hospital patients, children,
the elderly etc.,
No Not envisaged
3.5 Any other causes No -
4. Production of solid wastes during construction or operation or decommissioning
(MT/month)
S. Information/Checklist Yes Details thereof (with approximate
Amendment in EC Condition of Kharai Harudi Mining Project (ML Area: 2831.61 ha)
At Villages: Kharai, Jadva, Vaghapadhar & Harudi, Tehsil: Lakhpat & Abdasa, District: Kachchh (Gujarat)
Form – 1
M/s. UltraTech Cement Ltd. 9
(Unit: Sewagram Cement Works)
No confirmation /No quantities/rates, wherever possible) with
source of information data
4.1 Spoil, overburden or mine wastes No No OB and topsoil will be generated during
mining activity.
4.2 Municipal waste (domestic and or
commercial wastes)
Yes It is generated only from the mines office &
canteen, which is being/ will be disposed off
suitably by composting/land filling.
4.3 Hazardous wastes (as per Hazardous Waste Management
Rules)
No No hazardous wastes will be generated due to the mining project.
4.4 Other industrial process wastes No There will be no other industrial process waste
generation.
4.5 Surplus product No Not Envisaged
4.6 Sewage sludge or other sludge from
effluent treatment
No Not Envisaged
4.7 Construction or demolition wastes No No construction work.
4.8 Redundant machinery/ equipment No There will be no redundant machinery or
equipment.
4.9 Contaminated soils or other
materials
No This is a case of amendment in EC condition only.
No contamination of soil or any other materials as
adequate precautions taken to control air and
water pollution.
4.10 Agricultural wastes No There will not be any agricultural waste.
4.11 Other solid wastes No None.
5. Release of pollutants or any hazardous, toxic or noxious substances to air (Kg/hr)
S.
No
Information/Checklist
confirmation
Yes/
No
Details thereof (with approximate Quantities /
rates, wherever possible) with source of
information data
5.1 Emissions from combustion of fossil
fuels from stationary or mobile sources
Yes Vehicular emission is kept under control by
proper maintenance and by regular monitoring of fuel and oil consumption. Every effort is being/
will be made to minimize emissions.
5.2 Emissions from production process Yes Particulate Matter is emitted during excavation and kept below the prescribed limits by adopting
suitable mitigating measures. Water sprinkling on
haul roads and at loading faces is being /will be
done.
5.3 Emissions from materials handling
including storage or transport
Yes The loading of excavated material and
transportation emit some amount of pollutants.
Proper maintenance of HEMMs will help reduce such emissions. The fugitive emission on haul
road is suppressed by water spray.
5.4 Emissions from construction activity including plant& equipment
No No new construction work will come in the existing mine as this is a case of amendment in EC
Amendment in EC Condition of Kharai Harudi Mining Project (ML Area: 2831.61 ha)
At Villages: Kharai, Jadva, Vaghapadhar & Harudi, Tehsil: Lakhpat & Abdasa, District: Kachchh (Gujarat)
Form – 1
M/s. UltraTech Cement Ltd. 10
(Unit: Sewagram Cement Works)
condition.
5.5 Dust or odors from handling of materials including construction
materials, sewage and waste
Yes Dust is generated during excavation and loading/unloading. Dust suppression is done by
sprinkling of water.
5.6 Emission from incineration of waste No Incineration activity is not involved in the project.
5.7 Emissions from burning of waste in
open air (e.g. slash materials,
construction debris)
No There is no burning of waste in open air.
5.8 Emissions from any other sources No There will be no emissions from any other sources.
6. Generation of Noise and Vibration and Emissions of Light and heat:
S. No Information/Checklist
confirmation
Yes/
No
Details thereof (with approximate
quantities/rates, wherever possible) with
source of information data with source of
information data
6.1 From operation of equipment e.g. engines, ventilation plant, crushers
Yes Noise is generated due to mining activities during excavation, loading & transportation. Proper noise
abatement measures will be taken to keep noise level within the prescribed limit by CPCB.
Proper selection of machines and their maintenance leads to less noise generation.
Greenbelt will be developed which provides barrier to propagation of noise outside the area.
6.2 From industrial or similar process No There is no generation of noise from any other industrial process.
6.3 From construction or demolition No Not applicable, as no construction or demolition is proposed as this is a case of amendment in EC
condition.
6.4 From blasting or piling No There will be no blasting and hence no generation
of ground vibrations as mining will be done with the help of Surface miner. Noise will be generated
during excavation, loading & transport.
Plantation all around the mining area as noise
barrier will minimize propagation of noise.
Workers working in close vicinity of machines will
be provided with personal protective equipment
etc.
6.5 From construction or operational traffic
Yes There will be some noise due to movement of trucks/dumpers/excavator. Operation of
machinery will generate the noise. It is an intermittent/slow process. AC cabins have been
provided in all the equipment with very less noise inside the cabin.
6.6 From lighting or cooling systems No Not envisaged
6.7 From any other sources No Not envisaged
Amendment in EC Condition of Kharai Harudi Mining Project (ML Area: 2831.61 ha)
At Villages: Kharai, Jadva, Vaghapadhar & Harudi, Tehsil: Lakhpat & Abdasa, District: Kachchh (Gujarat)
Form – 1
M/s. UltraTech Cement Ltd. 11
(Unit: Sewagram Cement Works)
7. Risks of contamination of land or water from releases of pollutants into the ground or
into sewers, surface waters, groundwater, coastal waters or the sea:
S. No Information/Checklist
confirmation
Yes/
No
Details thereof (with approximate
quantities/rates, wherever possible) with
source of information data
7.1 From handling, storage, use or spillage of hazardous materials
No No use/handling of hazardous material takes place except periodical oil change which will be
handled in closed containers. Spillage of
Oil/Grease during maintenance of heavy vehicles
is controlled by using collection tray etc. Care is
taken during its use for lubrication of equipment,
so that nothing falls on ground to contaminate
soil. Equipments are being / will be kept well
maintained to keep them leakage free.
7.2 From discharge of sewage or other effluents to water or the land
(expected mode and place of discharge).
No Zero discharge principle is followed. Waste water from office toilets will be disposed off in soak pit
via septic tank.
7.3 By deposition of pollutants emitted
to air into the land or into water.
Yes Dust is generated by movement of machinery &
mining operations, excavation, loading and
unloading. There is likelihood of increase of PM concentration (which may affect surrounding land
or water).
Impact referred above is localized, transitory and
intermittent in nature, and hence their effect on
environment is insignificant. Dust generation on
the haulage roads will be suppressed by water
spray.
7.4 From any other sources. No Not envisaged
7.5 Is there a risk of long term build up
of pollutants in the environment from these sources?
No Impact on air quality is localized, transitory and
intermittent in nature. No likely impact on surface water is envisaged.
8. Risk of accidents during construction or operation of the Project, which
could affect human health or the environment
S. No Information/Checklist
confirmation
Yes/
No
Details thereof (with approximate
quantities/rates, wherever possible) with
source of information data
8.1 From explosions, spillages, fires etc from storage, handling, use or
production of hazardous substances
No No explosive will be used. Possibility of accident on account of explosion, spillages, fire or
hazardous substances etc is very less. Proper
maintenance, operation and leakage proof
condition of machinery eliminates possibilities of
fire. All the safety precautions will be taken.
8.2 From any other causes No Not envisaged.
8.3 Could the project be affected by
natural disasters causing
environmental damage (e.g. floods,
Yes The project falls under Seismic Zone- V.
Amendment in EC Condition of Kharai Harudi Mining Project (ML Area: 2831.61 ha)
At Villages: Kharai, Jadva, Vaghapadhar & Harudi, Tehsil: Lakhpat & Abdasa, District: Kachchh (Gujarat)
Form – 1
M/s. UltraTech Cement Ltd. 12
(Unit: Sewagram Cement Works)
earthquakes, landslides, cloudburst
etc)?
9. Factors which should be considered (such as consequential development) which could
lead to environmental effects or the potential for cumulative impacts with other existing
or planned activities in the locality
S.
No.
Information/Checklist
confirmation
Yes/
No
Details thereof (with approximate
quantities/rates, wherever possible) with
source of information data
9.1 Lead to development of supporting facilities, ancillary development or
development stimulated by the
project which
could have impact on the environment e.g.:
• Supporting infrastructure
(roads, power supply, waste or
waste water treatment, etc.)
• Housing development
• Extractive industries
• Supply industries
• Other
No Residential facilities provided to the staff in township within captive cement plant. There will
not be any impact on existing housing facilities of
surrounding villages. Power supply will be
available from Captive power plant. Waste water
is treated in township STP. Local people are
preferred for employment. This contributes in
raising the socio-economic status and standard of
living of the nearby villagers.
And no adverse effect on environment and supporting infrastructure is envisaged as the
project is an established one with its own arrangements. Therefore there will be no negative
impact on existing infrastructure of surrounding community.
9.2 Lead to after-use of the site, which could have an impact on the
environment
Yes The after use of site planned would be helpful to the society, owing to better greenery and
development of water reservoir supporting the
surrounding localities.
9.3 Set a precedent for later developments
Yes A better after use scenario, which is likely to increase aesthetic beauty of the area in addition to
benefit of greenery and water reservoir, would set precedence for subsequent entrepreneurs who
venture such projects.
9.4 Have cumulative effects due to
proximity to other existing or planned projects with similar
effects
No No cumulative effect is envisaged.
Some other mining leases are near to this lease but the impact of the project will be limited to M.L
Area.
(II) Environmental Sensitivity
S.
No
Areas Name/
Identity
Aerial distance (within 15
km.)
Proposed project location
boundary
1 Areas protected under international conventions, national or local legislation for
their ecological, landscape, cultural or other related value
Narayan Sarovar
Wildlife
Sanctuary
~4.80 km in NNE direction (as per Wildlife Clearance letter no
WLP/32/B/972-76/2013-14 Dated 08.05.2013)
Amendment in EC Condition of Kharai Harudi Mining Project (ML Area: 2831.61 ha)
At Villages: Kharai, Jadva, Vaghapadhar & Harudi, Tehsil: Lakhpat & Abdasa, District: Kachchh (Gujarat)
Form – 1
M/s. UltraTech Cement Ltd. 13
(Unit: Sewagram Cement Works)
2 Areas which are important or sensitive for
ecological reasons - Wetlands, watercourses
or other water bodies, coastal zone,
biospheres, mountains, forests
Narayan Sarovar
Wildlife
Sanctuary
~4.80 km in NNE direction (as
per Wildlife Clearance letter no
WLP/32/B/972-76/2013-14
Dated 08.05.2013)
Reserved Forests
� Harudi R.F.
� Maniyara R.F
� Ratipur R.F.
� Mindhari RF
Water Bodies
� Kasadwali Nadi
� Bhalyawal Talav
� Rakhadi Nadi
� Barkhan Nadi
� Golay Nadi
� Berwari Nadi
� Khari Nadi
� Kakdi Nadi
3 Areas used by protected, important or sensitive species of flora or fauna for
breeding, nesting, foraging, resting, over
wintering, migration
No No such area is located within 15 km radius area
4 Inland, coastal, marine or underground waters.
No Not any within 15 km radius
area.
5 State, National boundaries. No Not any within 15 km radius
area.
6 Routes or facilities used by the public for access to recreation or other tourist, pilgrim
areas.
National Highway - 8A
National highway -8A passing through lease area.
7 Defence installations. None No such area is located within
15 km radius area.
8 Densely populated or built-up area. None No such area is located within
15 km radius area
9 Areas occupied by sensitive man-made land uses (hospitals, schools, places of worship,
community facilities).
Yes There are primary schools, dispensaries, small hospitals,
places of worship within 15 km from the project site. No
dislocation or demolition is proposed. Adequate mitigation
measures will be taken to
ensure safety.
10 Areas containing important, high quality or scarce resources
None No such area is located within 15 km radius area
Amendment in EC Condition of Kharai Harudi Mining Project (ML Area: 2831.61 ha)
At Villages: Kharai, Jadva, Vaghapadhar & Harudi, Tehsil: Lakhpat & Abdasa, District: Kachchh (Gujarat)
Form – 1
M/s. UltraTech Cement Ltd. 14
(Unit: Sewagram Cement Works)
(Ground water resources, surface resources,
forestry, agriculture, fisheries, tourism,
minerals).
11 Areas already subjected to pollution or environmental damage. (Those where existing
legal environmental standards are exceeded).
None No such area is located within 15 km radius area
12 Areas susceptible to natural hazard which
could cause the project to present
environmental problems
(Earthquakes, subsidence, landslides, erosion,
flooding or extreme or adverse climatic
conditions).
Zone- V The area falls under seismic
Zone- V and is earthquake
prone but as there would not
be any high rise buildings
within the ML Area, no adverse impact is envisaged.
(III) Proposed Terms of Reference for EIA studies
This proposal is for amendment in specific condition, as reproduced below, stipulated in
Environmental Clearance granted by MoEF, New Delhi for the project vide their letter No. J-
11015/390/2008-IA.II ((M) dated 22nd February, 2011 & letter dated 22nd August, 2014, and
change in name of project proponent to M/s. UltraTech Cement Ltd. (Unit: Sewagram Cement
Works).
A. Specific Conditions
(xx):- “No Transportation of ore outside the mine lease area shall be carried out
after sunset.”
The company wishes to propose transportation of ore after sunset hours from the Mining lease
area 2831.61 ha.
All the other Environmental Safeguards/ the terms and conditions as stipulated in the
Environmental Clearance will be complied with by UTCL. Therefore, no Terms of Reference are
proposed.
Annexure List of Form-I
S. No.
Annexure Name Annexure No.
1 Khasra Details of M.L Area
I
2 Wildlife Clearance issued by Chief Wildlife Warden vide their
letter no. WLP/32/B/972-76/2013-14 dated 08.05.2013
II
******