Content Copy Of Original Ministry of the Environment and Climate Change Ministère de l’Environnement et de l’Action en matière de changement climatique AMENDED ENVIRONMENTAL COMPLIANCE APPROVAL NUMBER 7483-A45QAW Issue Date: March 15, 2016 Chemtura Canada Co./Cie. 25 Erb Street Elmira, Ontario N3B 3A3 Site Location: Elmira Plant 25 Erb Street, Township of Woolwich Regional Municipality of Waterloo You have applied under section 20.2 of Part II.1 of the Environmental Protection Act, R.S.O. 1990, c. E. 19 (Environmental Protection Act) for approval of: expansion of the existing sewage works for the collection, transmission, treatment and disposal of contaminated groundwater collected from the Municipal Aquifer under Elmira, Ontario (Offsite System), consisting of the following: Proposed Works Offsite Municipal Aquifer Collection System - one (1) groundwater extraction well (W3R), located in Elmira as shown on Figure 5.1 of Environmental Compliance Approval Application for Industrial Sewage Works submitted by Luis Almeida, of GHD Limited, and signed by Jeff Merriman, P.Eng., Environmental Remediation Manager, Chemtura Canada Co./Cie., dated August 20, 2015, and all supporting documentation and information, equipped with a submersible multi-stage well pump with a rated capacity of 40 litres per second and conveyed to Building 44C for chlorobenzene removal by the existing North and South Granular Activated Carbon (GAC) adsorbers. The effluent from the GAC system will be conveyed to the Building 45 Rayox Ultraviolet (UV) Oxidation System (existing), to remove n-nitrosodimethylamine (NDMA). The effluent from the UV reactors will then flow directly to the existing discharge structure at SS+890 to the Canagagigue Creek. - two (2) groundwater extraction wells (W6A and W6B), located in Elmira as shown on Figure 5.1 of Environmental Compliance Approval Application for Industrial Sewage Works submitted by Luis Almeida, of GHD Limited, and signed by Jeff Merriman, P.Eng., Environmental Remediation Manager, Chemtura Canada Co./Cie., dated August 20, 2015, and all supporting documentation and information, each housed in a heated and ventilated enclosure, each equipped with a submersible multi-stage well pump with a combined rated capacity of up to 4.8 litres per second and conveyed to Building 44D for chlorobenzene removal by the proposed new Granular Activated Carbon (GAC) adsorbers. The effluent from the GAC system will be conveyed to the existing Building 20A offsite UV Oxidation System (described below), to remove n-nitrosodimethylamine (NDMA). The effluent from the UV reactors will then be conveyed to the existing Ammonia Treatment System (ATS) for ammonia removal prior to discharge at the existing discharge structures at SS+890 and MISA 0800 to the

AMENDED ENVIRONMENTAL COMPLIANCE APPROVAL 7483 … · Canagagigue Creek. - one (1) groundwater extraction well (W8), located in Elmira as shown on Figure 5.1 of Environmental Compliance

  • Upload
    ngoliem

  • View
    214

  • Download
    0

Embed Size (px)

Citation preview

Content Copy Of Original

Ministry of the Environment and Climate Change Ministère de l’Environnement et de l’Action en matière de changement

climatique

AMENDED ENVIRONMENTAL COMPLIANCE APPROVAL NUMBER 7483-A45QAW 

Issue Date: March 15, 2016

Chemtura Canada Co./Cie. 25 Erb Street Elmira, Ontario N3B 3A3  

Site Location: Elmira Plant 25 Erb Street, Township of Woolwich Regional Municipality of Waterloo

You have applied under section 20.2 of Part II.1 of the Environmental Protection Act, R.S.O. 1990, c.E. 19 (Environmental Protection Act) for approval of:

  expansion of the existing sewage works for the collection, transmission, treatment and disposal ofcontaminated groundwater collected from the Municipal Aquifer under Elmira, Ontario (OffsiteSystem),  consisting of the following:  Proposed WorksOffsite Municipal Aquifer Collection System

- one (1) groundwater extraction well (W3R), located in Elmira as shown on Figure 5.1 ofEnvironmental Compliance Approval Application for Industrial Sewage Works submitted by LuisAlmeida, of GHD Limited, and signed by Jeff Merriman, P.Eng., Environmental Remediation Manager,Chemtura Canada Co./Cie., dated August 20, 2015, and all supporting documentation and information,equipped with a submersible multi-stage well pump with a rated capacity of 40 litres per second andconveyed to Building 44C for chlorobenzene removal by the existing North and South GranularActivated Carbon (GAC) adsorbers.  The effluent from the GAC system will be conveyed to theBuilding 45 Rayox Ultraviolet (UV) Oxidation System (existing), to remove n-nitrosodimethylamine(NDMA).  The effluent from the UV reactors will then flow directly to the existing discharge structure atSS+890 to the Canagagigue Creek.

  - two (2) groundwater extraction wells  (W6A and W6B),  located in Elmira as shown on Figure 5.1of Environmental Compliance Approval Application for Industrial Sewage Works  submitted by LuisAlmeida, of GHD Limited, and signed by Jeff Merriman, P.Eng., Environmental Remediation Manager,Chemtura Canada Co./Cie., dated August 20, 2015, and all supporting documentation and information,each housed in a heated and ventilated enclosure, each equipped with a submersible multi-stage wellpump with a combined rated capacity of up to 4.8 litres per second and conveyed to Building 44D forchlorobenzene removal by the proposed new Granular Activated Carbon (GAC) adsorbers.  Theeffluent from the GAC system will be conveyed to the existing Building 20A offsite UV OxidationSystem (described below), to remove n-nitrosodimethylamine (NDMA).  The effluent from the UVreactors will then be conveyed to the existing Ammonia Treatment System (ATS)   for ammoniaremoval prior to discharge at the existing discharge structures at SS+890 and MISA 0800 to the

Canagagigue Creek.   - one (1) groundwater extraction well  (W8), located in Elmira as shown on Figure 5.1 ofEnvironmental Compliance Approval Application for Industrial Sewage Works  submitted by LuisAlmeida, of GHD Limited, and signed by Jeff Merriman, P.Eng., Environmental Remediation Manager,Chemtura Canada Co./Cie., dated August 20, 2015,  housed in a heated and ventilated enclosure,equipped with a submersible multi-stage well pump with a rated capacity of up to 0.6 litres per secondand conveyed to Building 44D for chlorobenzene removal by the proposed new Granular ActivatedCarbon (GAC) adsorbers.  The effluent from the GAC system will be conveyed to the existing Building20A offsite UV Oxidation System (described below), to remove n-nitrosodimethylamine (NDMA).  Theeffluent from the UV reactors will then be conveyed to the existing Ammonia Treatment System (ATS)  for ammonia removal prior to discharge at the existing discharge structures at SS+890 and MISA0800 to the Canagagigue Creek.  - one (1) groundwater extraction well  (W9), located in Elmira as shown on Figure 5.1 ofEnvironmental Compliance Approval Application for Industrial Sewage Works  submitted by LuisAlmeida, of GHD Limited, and signed by Jeff Merriman, P.Eng., Environmental Remediation Manager,Chemtura Canada Co./Cie., dated August 20, 2015,  housed in a heated and ventilated enclosure,equipped with a submersible multi-stage well pump with a rated capacity of 28.5 litres per second andconveyed to the proposed new UV Oxidation System (described below), housed in Building 62, toremove n-nitrosodimethylamine (NDMA).  The effluent from the UV reactors will then flow directly tothe existing discharge structures at SS+890 and MISA 0800 to the Canagagigue Creek.  Proposed new Granular Activated Carbon (GAC) adsorbers- a granular activated carbon pre-treatment system located in Building 44D (new structure),consisting of two (2) fixed bed carbon adsorption units, each with a treatment capacity of up to 25 litresper second, dedicated to treating waters from W4, W5A, W5B, W6A, W6B, W8 (and potentially PW5),each containing 7,250 kilograms of activated carbon media, with the effluent from the carbon unitsbeing directed to the offsite UV oxidation system located in Building 20A.

  Proposed new UV Oxidation System- an offsite UV oxidation treatment system located in Building 62 with a treatment capacity of 28.5litres per second, treating groundwater from the proposed offsite well W9, consisting of two (2)ultraviolet oxidation reactor modules with two reactor zones, each zone will contain 72 low pressureultraviolet lamps operating at a wavelength less than 400 nanometers, discharging directly toCanagagigue Creek at SS+890 and /or the existing MISA 0800 outfall.

   Previous Worksexisting sewage Works for the collection, transmission, treatment and disposal of contaminatedgroundwater collected from the Municipal Aquifer and the Upper Aquifer on the Chemtura CanadaCo./Cie Property (Onsite System), the Upper Aquifer on the Yara/Nutrite property (Yara System) andthe Municipal Aquifer under Elmira, Ontario (Offsite System),  consisting of the following:

  Onsite Upper Aquifer Collection System- nine (9) containment wells (U+460, U+500, U+540, U+560, U+630, U+655, U+685, U+710 andU+735) each equipped with a submersible well pump rated at up to 1.14 litres per second and pumpfailure alarms, discharging via underground piping to the oil/water separator and/or the carbon tower

feed tank of the primary treatment plant of the Onsite Treatment System in Building 44C.

  - one (1) collection trench  (U+460T), located outside of Building 62, equipped with a submersiblewell pump rated at up to 1.14 litres per second and pump failure alarms, discharging  via undergroundpiping to the oil/water separator and/or the equalization tank of the primary treatment plant of theOnsite Treatment System in Building 44C.  - one (1) tile collection system  located at Building 44 consisting of an approximately 20 metre longunderground trench containing clear stone with a manhole housing an oil skimmer and sump pumpdischarging  at a rate of up to 0.40 litre per second to the oil/water separator of the Onsite TreatmentSystem in Building 44C.  - one (1) sump pump  located in the Balance Tank containment area sump, discharging  at a rate ofup to 1.0 litre per second to the carbon tower feed tank of the Onsite Treatment System in Building44C.  - one (1) submersible pump  located in Stormwater Pond RPW-8, discharging  treated stormwaterand/or groundwater to the carbon tower feed tank of the Onsite Treatment System in Building 44C.  Onsite Municipal Aquifer Collection System- one (1) containment well (PW1), to be used on a standby basis, equipped with a submersibleelectric well pump rated at 4.9 litres per second, discharging to the UV treatment system feed tank ofthe Onsite Treatment System in Building 20A.

  - one (1) containment well  (PW3), to be used on a standby basis, equipped with a submersibleelectric well pump rated at 2.6 litres per second, discharging  to the UV treatment system feed tank ofthe Onsite Treatment System in Building 20A.  - one (1) containment well  (PW4), equipped with a submersible electric well pump rated at 4.5 litresper second,   discharging  to the carbon tower of the primary treatment plant of the Onsite TreatmentSystem in Building 44C.  - one (1) containment well  (PW5), equipped with a submersible electric well pump rated at 4.5 litresper second, discharging  to the carbon tower of the primary treatment plant of the Onsite TreatmentSystem in Building 44C with provision to be directed to the carbon vessels of the Offsite MunicipalAquifer Treatment System in Building 44.  Offsite Municipal Aquifer Collection System- one (1) groundwater extraction well (W4), located in Elmira as shown on Figure 2.5 of Certificate ofApproval Amendment Application Support Document, Chemtura Co./Cie, Elmira, Ontario - Certificatesof Approval No. 4-0166-90-938 and 4-0146-97-986, prepared by Conestoga-Rovers & Associates,dated January 2007, housed in a heated and ventilated enclosure, equipped with a submersible multi-stage well pump with a rated capacity of 22.7 litres per second and discharging to the granularactivated carbon pretreatment system of the Offsite Municipal Aquifer Treatment System in Building44.

  - one (1) groundwater extraction well  (W3), to be used on a standby basis, located in Elmira asshown on Figure 2.5 of Certificate of Approval Amendment Application Support Document, Chemtura

Co./Cie, Elmira, Ontario - Certificates of Approval No. 4-0166-90-938 and 4-0146-97-986 , prepared byConestoga-Rovers & Associates, dated January 2007,  housed in a heated and ventilated enclosure,equipped with a submersible multi-stage well pump with a rated capacity of 22.7 litres per second anddischarging  to the granular activated carbon pretreatment system of the Offsite Municipal AquiferTreatment System in Building 44.  - two (2) groundwater extraction wells  (W5A and W5B),  located in Elmira as shown on Figure 2.5of  Certificate of Approval Amendment Application Support Document, Chemtura Co./Cie, Elmira,Ontario - Certificates of Approval No. 4-0166-90-938 and 4-0146-97-986 , prepared by Conestoga-Rovers & Associates, dated January 2007, each housed in a heated and ventilated enclosure, eachequipped with a submersible multi-stage well pump with a combined rated capacity of 15.2 litres persecond and discharging  to the granular activated carbon pretreatment system of the Offsite MunicipalAquifer Treatment System in Building 44.  Yara Piping Extension- piping, valves and appurtenances to transport groundwater from the Yara System from Building 44to the Ammonia Treatment System in Building 62.

  Onsite Treatment System- primary treatment system, located in Building 44C, consisting of the following:

 

- a coalescing plate type oil/water separator  rated at 3.3 litres per second, receiving  UpperAquifer water, discharging  to the carbon tower feed tank (used as required);  - one (1) 4.7 cubic metre tower feed tank , discharging to the carbon tower;  - one (1) 2 metre diameter by 8.5 metres Side Wall Depth upflow granular activated carbontower , with a granular activated carbon dewatering inclined screw type conveyor rated atapproximately 200 kilograms per hour (dry weight basis), and  - one (1) heat exchanger  (optional).

discharging to the onsite Groundwater Ultraviolet Oxidation Reactor System.

 - one (1) onsite Groundwater Ultraviolet Oxidation Reactor System , located in Building 20A,consisting of: 

- one (1) 45,400 litre dual compartmentalized UV oxidation system feed tank , discharging  toUV oxidation system; and  - one (1) UV oxidation system  consisting of three (3) ultra-violet oxidation reactor modules eachequipped with three (3) 30 kilowatt ultraviolet lamps operating at a wavelength less than 400nanometres, including hydrogen peroxide storage and metering equipment.  discharging to the Ammonia Treatment System.

Offsite Municipal Aquifer Treatment System- a granular activated carbon pretreatment system located in Building 44C, consisting of two (2)

fixed bed carbon adsorption units,  each with a treatment capacity of up to 30.3 litres per second,operated in parallel, dedicated to treating water from wells W3R or W3, each containing 5,500kilograms of granular activated carbon, with the effluent from the carbon units being directed to theoffsite UV oxidation system located in Building 45.

  - an offsite UV oxidation system  located in Building 45 with a treatment capacity of 40 litres persecond and treating groundwater from offsite wells W3R or W3, consisting of three (3) ultravioletoxidation reactor modules each equipped with three(3) 30 kilowatt ultraviolet lamps operating at awavelength less than 400 nanometres, discharging  to the Ammonia Treatment System or toCanagagigue Creek at SS+890.  - an offsite UV oxidation system  located in Building 20A with a treatment capacity of 25 litres persecond and treating groundwater from the offsite wells (and on an as needed basis PW5), consistingof two (2) ultraviolet oxidation reactor modules each equipped with three (3) 30 kilowatt ultravioletlamps operating at a wavelength less than 400 nanometres, discharging  to the Ammonia TreatmentSystem or to Canagagigue Creek at SS+890 or at the existing MISA 0800 outfall.  Ammonia Treatment System - 46 Litres per second capacity- one (1) biological treatment system for nitrification/denitrification activated sludge treatment with arated capacity of 46 litres per second, located in Building 62, consisting of  the following:

- one (1) splitter box , for the collection of influent streams, introduction of process chemicals anddirecting flows to the biological treatment reactors;

- two (2) biological treatment reactors , an anoxic reactor with a volume of 250 cubic metresand an oxic reactor with a volume of 509 cubic metres, including a pump well, jetaeration/mixing system of pure oxygen in the oxic reactor, recirculation system and mechanicalmixer for the anoxic reactor, discharging to the secondary clarifier;

- one (1) 12.2 metre diameter clarifier , equipped with sludge collection and scum skimming mechanisms, with return activated sludge pumping to the anoxic reactor and waste activatedsludge pumping to the sludge thickener, discharging to the effluent filters;

- six (6) dual media sand filters , each with a filter area of 4.2 square metres,  includingclearwell, mudwell, air scour system and backwash pumps, discharging  to Canagagigue Creekat SS+890 or at the existing MISA 0800 outfall; and

- three (3) sludge holding tanks , each with a storage volume of 75 cubic metres, includingtruck loading system.

 all other controls, chemical feed and storage systems, electrical equipment, instrumentation, piping,pumps, valves and appurtenances essential for the proper operation of the aforementioned sewageWorks.  all in accordance with supporting documents listed in Schedule 'A'. For the purpose of this environmental compliance approval, the following definitions apply: "Application" means the application for an environmental compliance approval submitted to the

Ministry for approval by or on behalf of the Owner and dated August 20, 2015.  "Approval" means this entire document and any schedules attached to it, and the application;  "Containment of the core area of contamination” means containment of the on-site contamination willbe measured and maintained along the western site boundary from monitoring well OW58-13 south toOW105d;  "Director" means a person appointed by the Minister pursuant to section 5 of the EPA for the purposesof Part II.1 of the EPA;  "District Manager" means the District Manager of the Guelph District Office of the Ministry;  "Effluent Broad Scan Parameters" means those parameters listed in Schedule 'B';  "EPA" means the Environmental Protection Act, R.S.O. 1990, c.E.19 , as amended;  " mg/l " means milligram per litre;  "Ministry" means the   ministry of the government of Ontario responsible for the EPA and OWRA and  includes all officials, employees or other persons   acting on its behalf;  "Offsite Broad Scan Parameters" means those parameters listed in Schedule 'C';  "Previous Works" means those portions of the sewage works previously constructed and approvedunder an Approval;  "Proposed Works" means the sewage works described in the Owner’s application, this Approval, to theextent approved by this Approval;  "Regional Director" means the Regional Director of the West Central Region of the Ministry;  "Owner" means  Chemtura Canada Co./Cie and includes its successors and assignees;  "OWRA" means the Ontario Water Resources Act, R.S.O. 1990, c. O.40 , as amended; and  "Works" means the sewage works described in the Owner's application, and this Approval, andincludes Proposed Works, and Previous Works. You are hereby notified that this environmental compliance approval is issued to you subject to theterms and conditions outlined below: TERMS AND CONDITIONS 1. GENERAL CONDITION  (1) The Owner shall ensure that any person authorized to carry out work on or operate any aspect ofthe Works is notified of this Approval and the terms and conditions herein and shall take all reasonablemeasures to ensure any such person complies with the same.  (2) Except as otherwise provided by these terms and conditions, the Owner shall design, build, install,operate and maintain the Works in accordance with this Approval.  

(3) Where there is a conflict between a provision of this environmental compliance approval and anydocument submitted by the Owner, the conditions in this environmental compliance approval shall takeprecedence.  Where there is a conflict between one or more of the documents submitted by theOwner, the Application shall take precedence unless it is clear that the purpose of the document wasto amend the Application  (4) Where there is a conflict between the documents listed in the Schedule A, and the application, theapplication shall take precedence unless it is clear that the purpose of the document was to amend theapplication.  (5) The terms and conditions of this Approval are severable.  If any term and condition of thisenvironmental compliance approval, or the application of any requirement of this environmentalcompliance approval to any circumstance, is held invalid or unenforceable, the application of suchcondition to other circumstances and the remainder of this Approval shall not be affected thereby.  (6) The issuance of, and compliance with the conditions of, this Approval does not: 

(a) relieve any person of any obligation to comply with any provision of any applicable statute,regulation or other legal requirement, including, but not limited to, the obligation to obtain approvalfrom the local conservation authority necessary to construct or operate the sewage Works; or  (b) limit in any way the authority of the Ministry to require certain steps be taken to require theOwner to furnish any further information related to compliance with this Approval.

  2. CHANGE OF OWNER  (1) The Owner shall notify the District Manager and the Director, in writing, of any of the followingchanges within thirty (30) days  of the change occurring: 

(a) change of address of Owner or operating authority;  (b) change of Owner or operating authority or both, including address of new Owner or operatingauthority, or both;  (c) change of partners where the Owner or operating authority is or at any time becomes apartnership, and a copy of the most recent declaration filed under the Business Names Act,R.S.O. 1990, c. B.17 ; and  (d) change of name of the corporation where the Owner or operator is or at any time becomes acorporation, and a copy of the “Initial Return” or “Notice of Change” filed under the CorporationsInformation Act, R.S.O. 1990, c. C.39 , shall be included in the notification to the District Manager.

 (2) In the event of any change in ownership of the Works, the Owner shall notify in writing thesucceeding owner of the existence of this Approval, and a copy of such notice shall be forwarded tothe District Manager.  (3) The Owner shall ensure that all communications made pursuant to this condition refer to thenumber at the top of this environmental compliance approval.   3. OPERATION AND MAINTENANCE 

 (1) The Owner shall ensure that at all times, the Works and related equipment and appurtenanceswhich are installed or used to achieve compliance with this Approval are properly operated andmaintained.    (2) In furtherance of, but without limiting the generality of, the obligation imposed by subsection (1) theOwner shall ensure that: 

(a) the influent flow rate to the Onsite Treatment System from the containment well  PW4 and UAwells/trenches does not exceed 5 litres per second ;  (b) the influent flow rate to the Offsite Treatment System from wells PW5, W3/W3R, W4, W5A,W5B, W6A, W6B, W8 and W9, does not exceed 87.2 litres per second ;  (c) the influent flow rate to the Ammonia Treatment System does not exceed 46 litres per second;  (d) the total influent flow rate and effluent discharge rate does not exceed 92.2 litres per second;  (e) the Owner has the flexibility to adjust individual flows from the Offsite extraction wells andensure the influent flow rate to the Offsite Treatment System does not exceed 87.2 litres persecond ;  (f) the Owner shall notify the Ministry of extraction well flow adjustments as part of the requiredroutine reporting as specified in condition 24 of this Approval;  (g) funding, staffing, training of staff, laboratory and process controls, quality assurance andquality control procedures of or in relation to the Works are adequate to achieve compliance withthis Approval;  (h) equipment and material are kept on hand and in good repair for immediate use in the event of: 

(i) upset;  (ii) bypass;  (iii) abnormal loss of any product, by-product, intermediate product, oil, solvent, waste materialor any other polluting substance into the environment or interior of any building; or,  (iv) spill within the meaning of Part X of the EPA.  and staff are trained in the use of said equipment and material and in the methods andprocedures to be employed upon the occurrence of such an event; 

(i) procedures for receiving and responding to public complaints be followed as outlined in theOwner's EMS Communication document, as updated from time to time; and  (j) Contingency Plans and Procedures  are followed for addressing upsets, abnormal losses ofany product, by-product, intermediate product, oil, solvent, waste material or any other pollutingsubstance into the environment or interior of any building and spills within the meaning of Part X ofthe EPA will be dealt with in accordance with the Owner's Spill Prevention Report, as updatedfrom time to time, to prevent or minimize gas or odour emissions or sewage or other contaminant

discharges into the natural environment.

  4. OPERATIONS MANUAL  (1) In furtherance of, but without limiting the generality of the obligation imposed by Condition 3, theOwner shall prepare an operations manual and shall revise and implement said operations manual.  (2) The Owner shall ensure that the manual includes as a minimum: 

(a) operating procedures for routine operation of the Works;  (b) inspection programs, including frequency of inspection, for the Works and the methods or testsemployed to detect when maintenance is necessary;  (c) repair and maintenance programs, including the frequency of maintenance, for the Works; and  (d) any other plans and procedures which are necessary because of the special nature of thefacilities served by the Works, the materials used in those facilities or in the Works, the Worksitself or the location thereof.

 (3) The Owner shall maintain the operations manual, as revised from time to time, at the Owner's plantat 25 Erb Street in Elmira, Ontario for so long as it is in operation, and shall make it available forinspection and copying by Ministry employees upon request.  (4) The Owner shall keep the operations manual up to date through revisions undertaken from time totime, so as to reflect any changes in described operation and maintenance procedures for the Worksor any newly introduced operation and maintenance procedures.  (5) All written inspection and maintenance records shall be maintained in accordance with theinspection and maintenance plans, procedures and programs outlined in the Operations Manual. Written, or electronic file format, records shall be maintained at the site for a period of five (5) years and made available to an inspector upon request.   5. USE OF TREATED AND UNTREATED GROUNDWATER FOR COOLING PURPOSES  The Owner may utilize untreated  and/or treated groundwater from the Off-Site Collection andTreatment System to provide cooling for wastewater and process applications in separate treated anduntreated water cooling systems, provided that:  (a) any untreated cooling water is directed to the treatment system prior to discharge, and  (b) the quality of the effluent discharged to the Canagagigue Creek meets the requirements outlined inCondition 7.   6. EFFLUENT OBJECTIVES  (1) The Owner shall use best efforts to design, construct, operate and maintain the Works with theobjective that the concentrations of the materials named below as effluent parameters in the effluent

from the Works do not exceed the non-detect concentrations specified below.  

Table 1 - Effluent ObjectivesEffluent Parameter Concentration Objective 

(micrograms per litre unless otherwiseindicated)

Benzothiazole 2

Bis (2-ethylhexyl) Phthalate 2

Carboxin 2

Chlorobenzene 0.5

Cyanide 5

1,1-Dichloroethane 1

Formaldehyde 5

Lindane 0.003

N-Nitrosodiethylamine 0.06

N-Nitrosodimethylamine 0.01

Nitrosomorpholine 0.06

Toluene 0.4

 (2) As a further objective, the Owner shall use best efforts to design, construct, operate and maintainthe Works with the objective that the concentration of Total Ammonia does not exceed 1.8 milligramsper litre as ammonia during the months of November  to the end of April  and does not exceed 0.62milligrams per litre as ammonia during the months of May  to the end of October .  (3) For the purposes of this condition, best efforts means conducting the prescribed monitoring,continually modifying and adjusting the operation of the Works within the approved design capacityand operation of the Works, but does not include modifying and adjusting the operations of the Worksfor changes in factors beyond the control of the Owner which can not practicably be accommodatedwithin the approved design capacity and operation of the Works.  (4) The Owner shall include in all reports submitted in accordance with Conditions 24 and 25 asummary of the efforts made and results achieved under this Condition.   7. EFFLUENT LIMITS  (1) The Owner shall design, construct, operate and maintain the Works such that the discharge fromthe Works to Canagagigue Creek does not exceed 92.2 litres per second and that the concentrationsof the materials named below as effluent parameters are not exceeded in the effluent from the Works.  

Table 2 - Effluent LimitsEffluent

ParameterConcentration Limit 

(micrograms per litre unless otherwise indicated)

Column 1Column 2 Flow < 46  

litres per second

Column 3 46 < Flow < 70 litres per second

Column 4 70 < Flow < 92.2  litres per second

Column 5 Flow of 92.2  

litres per second

Ammonia Based onCondition 7.(5)

Based onCondition 7.(5)

Based onCondition 7.(5)

Based onCondition 7.(5)

1,1-Dichloroethane 10 10 10 * [70 / Flowrate] 7.59

5-day BiochemicalOxygen Demand 15 mg/l 15 mg/l 15 mg/l * [70 /

Flow rate] 11.4 mg/l

Bis (2-ethylhexyl)Phthalate 5 5 5 * [70 / Flow rate] 3.80

Carboxin 7 7 * [46 / Flow rate] 7 * [70 / Flow rate] 3.49

Chlorobenzene 10 10 * [46 / Flowrate]

10 * [70 / Flowrate] 4.99

Cyanide 14 14 14 * [70 / Flowrate] 10.6

Formaldehyde 24 24 24 * [70 / Flowrate] 18.2

Lindane 0.14 0.14 * [46 / Flowrate]

0.14 * [70 / Flowrate] 0.07

Benzothiazole 4 4 * [46 / Flow rate] 4 * [70 / Flow rate] 2.00N-Nitrosodiethylamine

4 4 4 * [70 / Flow rate] 2.00

N-Nitrosodimethylamine

0.14 0.14 * [46 / Flowrate]

0.14 * [70 / Flowrate] 0.07

Nitrosomorpholine 4 4 * [46 / Flow rate] 4 * [70 / Flow rate] 2.00Toluene 5 5 * [46 / Flow rate] 5 * [70 / Flow rate] 2.49

Total Phosphorus 0.5 mg/l 0.5 mg/l 0.5 mg/l * [70 /Flow rate] 0.4 mg/l

pH of the effluent maintained between 5.5 to 9.5, inclusive, at all times (2) For the purposes of determining compliance with and enforcing subsections (1) and (5): 

(a) exceedance of a concentration for all parameters when monitoring is on a monthly basis, isdeemed to have occurred when the arithmetic mean, based on a rolling average, of dailycomposite samples, taken during the previous three month period, analyzed for a parameternamed in subsection (1) and/or (5), is greater than the corresponding maximum concentration setout in subsection (1) and/or (5).  (b) exceedance of a flow when monitoring is on a daily basis, is deemed to have occurred whenthe arithmetic mean, based on a rolling average, of the daily flow readings, taken during a periodof one week, is greater than 92.2 litres per second. 

(3) The Owner shall maintain the pH of the effluent from the Works within the range of 5.5 to 9.5,inclusive, at all times.  An exceedance of pH is deemed to have occurred when any singlemeasurement is outside of this range.   (4) The Owner shall operate the Works such that the undiluted effluent being discharged from theWorks is not acutely toxic.  An exceedance is considered to have occurred if any effluent sample ismeasured to be acutely toxic based on the protocols outlined in Condition 17.(4).  (5) The Owner shall operate the Works such that the concentration of Total Ammonia in the effluent

being discharged to the Canagagigue Creek does not exceed 2.4 milligrams per litre as ammonia(during the months of November to the end of April) and 0.84 milligrams per litre as ammonia duringthe months of May to the end of October  or the concentration calculated from the following equation,whichever is greater:  

Calculation for Total Ammonia Concentration LimitMaximum Total Ammonia (in milligrams per litre)  =  0.10                         f  where:          f =            1                 (10(pKa - pH) + 1)  and              pKa = 0.09018  +   2729.92               (A + 273.16)                       A = (TcQc + TeQe) / (Qe + Qc)with pH = pH of Canagagigue Creek at SS+380;

         Tc = temperature of Canagagigue Creek at SS+380 (in degrees Celsius);         Te = temperature of the effluent from the Works (in degrees Celsius);         Qc = flow of Canagagigue Creek at SS+385 stilling well (in cubic metres                 per second); and         Qe = flow of the effluent from the Works (in cubic metres per second). (6) For the purposes of subsection (5), the maximum pH and Temperature measured pursuant toConditions 17 and 19 for the preceding week shall be used to determine the Total AmmoniaConcentration Limit for the coming week.  In the event that the maximum Creek pH recorded for thepreceding week is a single occurrence of less than 2 hours duration, the next-highest Creek pH levelrecorded is to be used to determine the Total Ammonia Concentration Limit.  (7) In the event of an exceedance, the Owner shall notify the District Manager, forthwith orally and inwriting within five (5) business days , of the reason(s) for the exceedance and what correctivemeasures have been taken to prevent recurrence.  If the circumstances leading to the exceedanceremain present at the time the exceedance is discovered, the Owner shall cease discharge from theWorks immediately.  The discharge from the Works may resume upon the written concurrence of theDistrict Manager.  (8) The Owner shall maintain the discharge temperature from the Works such that the temperaturedoes not exceed 25 degrees Celsius at any time.  An exceedance with respect to dischargetemperature is deemed to have occurred if any single measurement of the discharge temperature isgreater than 25 degrees Celsius.   8. SURFACE WATER QUALITY REQUIREMENTS  (1) If the Primary Surface Water Quality Monitoring indicates that: 

(a) for any parameter on Schedule E, excluding Un-ionized Ammonia, the concentration of theparameter at SS+925 (and/or SS+855 when effluent is discharged from the MISA 0800 outfall) ismeasured to be 2.0 times the concentration of the parameter at SS-110 and the concentration ofthe parameter measured at SS+925 (and/or SS+855 when effluent is discharged from the MISA0800 outfall) exceeds the concentration in Schedule E of this Approval; or   

(b) the concentration of Un-ionized Ammonia at SS+925 (and/or SS+855 when effluent isdischarged from the MISA 0800 outfall) is measured to be 1.3 times the concentration of Un-ionized Ammonia at SS-110 and the concentration of Un-ionized Ammonia measured at SS+925(and/or SS+855 when effluent is discharged from the MISA 0800 outfall) exceeds theconcentration in Schedule E of this Approval; or   (c) for any parameter on Schedule E for which the concentration is below their respectivelaboratory analytical detection limit (ie. non-detect) at SS-110 and the concentration measured atSS+925 (and/or SS+855 when effluent is discharged from the MISA 0800 outfall) is greater thanthat on Schedule E;

then the Owner shall undertake confirmatory sampling, consisting of the collection of four (4) 3Part Composite samples at SS-110 and SS+925 (and/or SS+855 when effluent is discharged fromthe MISA 0800 outfall), all collected on the same day that the following month's monitoring underlow flow is conducted, and these five (5) samples, shall be analyzed within ninety-six (96) hours for those parameters which exceeded the above criteria.

 (2) If the arithmetic mean (5 data points) of: 

(a) the concentrations from the four (4) confirmatory samples collected, in subsection (1), at SS-110 and SS+925 (and/or SS+855 when effluent is discharged from the MISA 0800 outfall) of anexceeded parameter, and   (b) the concentration of the same parameter from the current months surface water monitoringinitial sampling at SS-110 and SS+925 (and/or SS+855 when effluent is discharged from the MISA0800 outfall),

exceeds the criteria in subsection (1), the Owner shall initiate the Surface Water QualityContingency Plan as outlined in Schedule D.

 (3) For the purposes of subsection (3), a value equivalent to 0.5 times the laboratory analyticaldetection limit shall be used for concentrations below the detection limit when calculating the arithmeticmean.  (4) If based on an annual review, all the Primary Surface Water Quality Monitoring data collected, withat least one (1) year  of record and a minimum two (2) year  data set, indicates that: 

(a) the arithmetic mean concentration of any parameter on Schedule E is found to be statisticallyhigher at SS+925 (and/or SS+855, as appropriate when effluent is discharged from the MISA0800 outfall) than at SS-110 at a 99% confidence level using suitable statistical methodsacceptable to the District Manager, and  (b) the arithmetic mean concentration of any parameter on Schedule E at SS+925 (and/orSS+855, as appropriate when effluent is discharged from the MISA 0800 outfall) is greater thanthat on Schedule E,

then the Owner shall initiate the Surface Water Quality Contingency Plan as outlined in ScheduleD.

 (5) If the Secondary Surface Water Quality Monitoring reveals: 

(a) exceedances of PWQOs;  (b) background concentrations (SS-110); and   (c) Schedule E concentrations;  at SS+270 (East, Centre and West), SS+385 (East, Centre and West) or SS+770 (East, Centreand West), by at least a factor of 5 for any Schedule E parameter, the Owner shall initiateconfirmatory sampling within three (3) working days , consisting of the collection of two (2)additional 3 Part Discrete samples at the surface water quality sampling locations where theabove criteria was exceeded and, within ninety-six (96) hours , have these samples analyzed forthose parameters which exceeded the criteria.  Also, additional creek water samples must becollected at these locations for the purpose of undertaking toxicity testing.

 (6) If the confirmatory sampling, conducted pursuant to subsection (5), indicates that the criteria insubsection (5) is not being met for the same parameter, then toxicity testing, on a pass/fail basis, mustbe conducted on the additional undiluted creek water samples in accordance with the EnvironmentCanada publications "Reference Method for Determining Acute Lethality of Effluents to Rainbow Trout"(July 1990) and "Reference Method for Determining Acute Lethality of Effluents to Daphnia   magna "(July 1990), as amended from time to time by more recently published editions.  (7) If the toxicity testing conducted pursuant to subsection (6) indicates that the creek water samplesare acutely toxic to aquatic biota, then the Owner shall initiate the Surface Water Quality ContingencyPlan as outlined in Schedule D.   9. UPPER AQUIFER HYDRAULIC CONTAINMENT REQUIREMENTS  (1) The Owner shall operate the approved Works with the objective of maintaining the elevation of thesurface of the Upper Aquifer in the southwest portion of the Owner's property, along the west side ofCanagagigue Creek, at least 5 centimetres below the water surface elevation in Canagagigue Creek.  (2) The Owner shall operate the Works with the requirement that, based on ground water monitoring,the water level of the surface of the Upper Aquifer in the southwest portion of the Owner's property ismaintained at least 1 centimetre below the surface water elevation of Canagagigue Creek, except forperiods of time less than one (1) day  after the containment system ground water levels have reachedequilibrium.     (3) Notwithstanding subsection (2), in the event of routine maintenance, equipment repair and/orCreek water level fluctuations beyond the control of the Owner, the 1 centimetre differential requiredby subsection (2) need not be maintained for periods of time up to five (5) days  after the containmentsystem ground water levels have reached equilibrium.    10. ACHIEVING ONTARIO DRINKING WATER QUALITY STANDARDS  (1) The Owner shall conduct an annual evaluation of the success and adequacy of the groundwaterremediation operations in achieving the goal of Ontario Drinking Water Quality Standards by the year2028.  

(2) The Owner shall conduct an annual evaluation of the status of the indicators for the need foradditional offsite extraction wells.  (3) The Owner shall include the information required by subsections (1), and (2) as part of the AnnualPerformance Report pursuant to Condition 25.    (4) In the event that mass removal calculations and/or computer modelling predictions, indicate thatimprovements to the Works are required to meet the goal of remediating the municipal aquifer underElmira to Ontario Drinking Water Quality Standards by the year 2028, the Owner shall propose theimprovements, such as, but not limited to, increasing the pumping rate at the existing extraction wells,or installation of additional extraction well(s) or other remediation measures to achieve OntarioDrinking Water Quality Standards by the year 2028.  The Owner shall submit the proposal, including aschedule for implementation, to the Regional Director and the District Manager for review andcomment(s).  (5) The Owner shall submit an application to the Director for the amendment of this Approval thatincludes the proposal and a schedule for implementation required by subsection (4).   11. AQUIFER REMEDIATION OPTIMIZATION – CORE AREA CONTAINMENT  (1) The Owner shall maintain site containment in the core contaminated areas in the MU (along thewestern Chemtura property boundary from OW58 southward to OW 105) at all times (It is recognizedthat short-term interruptions in pumping could occur due to power outages or other unforeseeablecircumstances) and shall monitor sentry wells for both water levels and water quality, which shall beused to confirm the ongoing containment of the core contaminated areas.   (2) In furtherance to subsection (1), the Owner shall: 

(a) measure and maintain on-site containment at the western site boundary, between monitoringwells OW58-13 and OW-105d. The Owner shall, on a continuous basis (intervals not less thanone hour) measure the water levels in the following wells : 

Pair 1: OW62-17/CH-47E;  

Pair 2: OW104d/CH-97B;

Pair 3: OW160-13/CH-97B;  

If, following the Ammonia Treatment Plant Startup Period, the water level in on-Site monitoringwell OW62-17 is not at least 1 centimetre lower than the water level in off-Site monitoring wellCH-47E or the water levels in either of on-Site monitoring wells OW104d or OW160-13 are notat least 1 centimetre lower than the water level in off-Site monitoring well CH-97B, the Ownershall adjust pumping rates to maintain containment, and if containment is not attained withinfive (5) working days , initiate monthly groundwater sampling for chlorobenzene and NDMAanalyses.  Such monthly samples shall be collected from off-Site sentry monitoring wells CH-47E, CH-97B, CH-56B and CH-89B;

 (b) compile twelve (12) months  of monitoring data, from the wells referred to in paragraph (a)above after start up of the Ammonia Treatment Plant and extraction well PW5, with any supportingdata, and provide a report to the District Manager and Regional Director, on the containment of

the core area of contamination, with recommendations on future monitoring for the approval of theDirector;  (c) collect groundwater samples for chlorobenzene and NDMA analyses from off-Site monitoringwells OW58-13, CH-89B and OW165-17 on a monthly basis following the Ammonia TreatmentPlant Startup Period;   (d) in the event that the groundwater analytical data collected pursuant to Paragraphs (a) and (c)above indicates that the concentrations of NDMA and/or chlorobenzene in the groundwater at asentry monitoring well demonstrate an increasing trend as determined using the Mann-Kendalltest, with a minimum of four (4) samples, including one baseline sample, at an individual sentrymonitoring well, notify the District Manager and the Regional Director within two (2) weeks  ofreceiving the analytical results for the last sample, in writing of the reason(s) for the increasedconcentrations, including an evaluation of the loss of containment and what corrective measureshave been or will be taken to prevent recurrence.  If an increasing trend is not identified, monthlysampling shall cease at the wells identified in Paragraph (a); and   (e) in the event of routine maintenance, equipment repair, or circumstances beyond the Owner’scontrol, the elevation differential required by subsection (2) need not be maintained for periods oftime up to two (2) weeks  after the containment system groundwater levels have reachedpumping equilibrium.

  12. AQUIFER REMEDIATION OPTIMIZATION – FULL SITE CONTAINMENT  A loss of site containment along the western property boundary that does not result in the loss ofcontainment of on-site contamination at the western site boundary, between monitoring wells OW58-13 and OW-105d is permitted if the water leaving the site boundary is captured by wells W5A and/orW5B.  If W5A and W5B are shut down for a period of time greater than two weeks, the Owner shallcontain contaminated groundwater in the Upper Municipal Aquifer beneath the property using existingon-Site Municipal Aquifer extraction wells, as appropriate.   13. AQUIFER REMEDIATION OPTIMIZATION – EFFECTIVE CAPACITY UTILIZATION  The extraction well and groundwater treatment systems shall be pumped so that they utilize theeffective hydraulic/treatment capacity of the on-site and off-site treatment systems at all times.    14. AQUIFER REMEDIATION OPTIMIZATION – COMPUTER MODEL  (1) The model developed for the Optimization Study, or an amended, updated or alternate modelapproved by the Regional Director, shall continue to be used on a regular basis, with a “Check Point”on the progress of the aquifer remediation at a minimum of every five (5) years  (including testing andupdating, if necessary, of model predictions through comparison to groundwater monitoring results, toensure that the system is being used in an optimal manner).  Preparation of plume maps (coveringboth model predictions and actual monitoring results) shall be a part of this Check Point process.   (2) One (1) year  following the Ammonia Treatment Plant Startup Period and every five (5) years thereafter, the Owner shall complete an evaluation of the success and adequacy of the computermodel constructed for the Optimization Study.  This shall include simulations of future remediation

progress at five year intervals, check points and comparison of the simulation predictions to the actualdata gathered, and evaluation of the success and adequacy of the current groundwater remediationoperations in achieving the goal of Ontario Drinking Water Standards by the year 2028 andrecommendations for any improvements, if needed.  New simulations will be done if the predicted(simulated) concentrations are not comparable to the actual concentrations at the check point. Preparation of plume maps (covering both model predictions and actual monitoring results) shall be apart of this process.  The information, including the actual plume maps (containing the check points)and the modelled plume maps shall be compiled in a section of the Annual Monitoring Report, or at afrequency which is required by the 1991 Directors Order (as amended).   15. AQUIFER REMEDIATION OPTIMIZATION – MAPPING  The Owner shall keep a current map of the positions of the extraction wells and monitoring/sentrywells, and shall provide this map to the Ministry, or members of the Remediation Advisory Committee(RAC) upon request.    16. INFLUENT MONITORING  The Owner shall, upon commencement of operation of the sewage Works, carry out the followingmonitoring program:  (1) All samples and measurements taken for the purposes of this Approval are to be taken at a timeand in a location characteristic of the quality and quantity of the effluent stream over the time periodbeing monitored.  (2) Samples shall be collected and analyzed at the following sampling point(s), at the samplingfrequencies and using the sample type specified for each parameter listed:    

Table 3 - Onsite Municipal Aquifer Wells MonitoringLocations PW1, PW3, PW4, PW5, and Upper

Aquifer Wells (at GUA), if in operation atthe time of sampling

Frequency Once every six (6) months

Sample Type Grab

Parameters Effluent Broad Scan Parameters (seeSchedule 'B')

Table 4 - Offsite Wells MonitoringFrequency Once Every three (3) months

Sample Type Grab

Parameters Total Ammonia, pH (field), Temperature(Field), Chlorobenzene, N-Nitrosodimethylamine

Frequency Once Every six (6) months

Sample Type Grab

Parameters Offsite Broad Scan Parameters (seeSchedule 'C')

 (3) The methods and protocols for sampling, analysis, toxicity testing, and recording shall conform, inorder of precedence, to the methods and protocols specified in the following:

 (a) the Ministry's publication "Protocol for the Sampling and Analysis of Industrial/MunicipalWastewater" (August 1994), ISBN 0-7778-1880-9, as amended from time to time by more recentlypublished editions;  (b) the publication "Standard Methods for the Examination of Water and Wastewater" (20thedition) as amended from time to time by more recently published editions;   (c) the United States Environmental Protection Agency Test Methods for Evaluating Solid Waste,Volume I: Laboratory Manual, Physical and Chemical Methods; November 1992, SW-846, ThirdEdition, as amended from time to time by more recently published editions; and  (d) in respect of any parameters not mentioned in (a) - (c), the written approval of the DistrictManager, which approval shall be obtained prior to sampling. 

(4) In the event subsection (2) requires a different sample type than subsection (3), the lattersubsection shall prevail.  (5) The temperature and pH of the effluent from the Works shall be determined in the field at the timeof sampling for total ammonia.  The concentration of un-ionized ammonia shall be calculated using thetotal ammonia concentration, pH and temperature using the methodology stipulated in "Ontario'sProvincial Water Quality Objectives" dated July 1994, as amended, for ammonia (un-ionized).  (6) The Offsite Broad Scan Parameters to be monitored pursuant to subsection (2) and Table 4 shallbe the Long List parameters, as outlined in Schedule 'C', for the first year of operation of the newAmmonia Treatment Plant and every fifth year thereafter.  For all other times the Short Listparameters, as outlined in Schedule 'C', shall be used.  (7) All monitoring related to this condition is in addition to any or all other monitoring programs beingconducted on the site.  (8) The Owner shall retain for a minimum of five (5) years  from the date of their creation, all recordsand information related to or resulting from the monitoring activities required by this Approval.    17. EFFLUENT QUALITY MONITORING AND RECORDING  The Owner shall carry out the following monitoring program:  (1) All samples and measurements taken for the purposes of this Approval are to be taken at a timeand in a location characteristic of the quality and quantity of the effluent stream over the time periodbeing monitored.  (2) Samples shall be collected and analyzed at the following sampling point(s), at the samplingfrequencies and using the sample type specified for each parameter listed:  

Table 5 - Effluent Quality Monitoring

Location Discharge(s) to Canagagigue Creek  (MISA 0800 and SS+890)

Frequency Once each month

Sample Type Composite

Parameters General Chemistry Total Ammonia, pH (Field), Temperature(field), Cyanide, Formaldehyde, TotalPhosphorus, 5-day Biochemical OxygenDemand.  Organic Compounds 1,1-Dichloroethane, Benzothiazole, Bis (2-ethylhexyl) Phthalate, Carboxin,Chlorobenzene, Lindane, N-Nitrosodiethylamine, N-Nitrosodimethylamine, Nitrosomorpholine,Toluene.

Frequency Once every three (3) months

Sample Type Composite

Parameters Effluent Broad Scan Parameters

Frequency Acute Toxicity (once every three (3)months ) Chronic Toxicity (twice a year,only if not acutely toxic)

Sample Type Grab

Parameters Acute Toxicity (Rainbow Trout andDahpnia magna) Chronic Toxicity (Fathead Minnows andCeriodaphnia dubia)

 (3) For the purposes of subsection (2), Composite means a sample consisting of a volume of effluentmade up of three (3) or more sub-samples that have been collected at equal intervals over a twenty-four (24) hour  period, combined automatically or manually or obtained from a slip- stream into an on-line analyzer.  (4) The methods and protocols for sampling, analysis, toxicity testing, and recording shall conform, inorder of precedence, to the methods and protocols specified in the following: 

(a) the Ministry's publication "Protocol for the Sampling and Analysis of Industrial/MunicipalWastewater" (August 1994), ISBN 0-7778-1880-9, as amended from time to time by more recentlypublished editions;  (b) the publication "Standard Methods for the Examination of Water and Wastewater" (20thedition) as amended from time to time by more recently published editions;   (c) the United States Environmental Protection Agency Test Methods for Evaluating Solid Waste,

Volume I: Laboratory Manual, Physical and Chemical Methods; November 1992, SW-846, ThirdEdition, as amended from time to time by more recently published editions;  (d) the Environment Canada publications "Biological Test Method: Reference Method forDetermining Acute Lethality of Effluents to Rainbow Trout" (July 1990) and "Biological TestMethod: Reference Method for Determining Acute Lethality of Effluents to Daphnia   magna " (July1990), as amended from time to time by more recently published editions;  (e) "Biological Test Method: Test of Larval Growth and Survival Using Fathead Minnows"(February 1992) and "Biological Test Method: Test of Reproduction and Survival Using theCladoceran Ceriodaphnia   dubia " (February 1992), as amended from time to time by morerecently published editions; and   (f) in respect of any parameters not mentioned in (a) - (e), the written approval of the DistrictManager, which approval shall be obtained prior to sampling. 

(5) In the event subsection (2) requires a different sample type than subsection (4), the lattersubsection shall prevail.  (6) The temperature and pH of the effluent from the Works shall be determined in the field at the timeof sampling for total ammonia.  The concentration of un-ionized ammonia shall be calculated using thetotal ammonia concentration, pH and temperature using the methodology stipulated in "Ontario'sProvincial Water Quality Objectives" dated July 1994, as amended, for ammonia (un-ionized).    (7) All monitoring related to this condition is in addition to any or all other monitoring programs beingconducted on the site.  (8) All acute and chronic toxicity testing conducted pursuant to this condition shall be conducted onundiluted effluent.  (9) The measurement frequencies specified in subsection (2) in respect of any parameter are minimumrequirements which may, after twenty-four (24) months  of monitoring in accordance with thisCondition, be modified by the Director in writing from time to time.  (10) The Owner shall retain for a minimum of five (5) years  from the date of their creation, all recordsand information related to or resulting from the monitoring activities required by this Approval.    18. EFFLUENT FLOW MONITORING  (1) The Owner shall install and maintain continuous flow measuring device(s) to measure the systemflowrate being discharged to Canagagigue Creek at MISA 0800 and SS+890, with an accuracy towithin plus or minus 15 per cent of the actual flowrate for the entire design range of the flow measuringdevice(s).   (2) The Owner shall measure or calculate, and record the flowrate each day.   19. RECEIVER WATER QUALITY MONITORING  The Owner shall  carry out the following receiver water quality monitoring program:  (1) The Canagagigue Creek shall be sampled at the sampling locations, at the measurement

frequencies, using the sample types and for each parameter all specified below.   

Table 6- Canagagigue Creek Primary Surface Water Quality MonitoringLocations SS-110, SS+855 (when effluent is

discharged at MISA 0800) ,  and SS+925 asidentified in Figure 2.2 of Certificate ofApproval Amendment Application SupportDocument, Chemtura Co./Cie, Elmira,Ontario - Certificates of Approval No. 4-0166-90-938 and 4-0146-97-986 , preparedby Conestoga Rovers & Associates, datedJanuary 2007.

Frequency Once every month

Sample Type 3 Part Composite

Parameters General Chemistry Total Ammonia, pH (field), Temperature,(field), and Dissolved Oxygen (field).  Volatile Organic Compounds Benzene, Chlorobenzene, m,p-Xylenes,Toluene, and Trichloroethene.  Base/Neutral/Acid Extractables Aniline, Bis (2-ethylhexyl) Phthalate,Carboxin, N-Nitrosodiethylamine, N-Nitrosodimethylamine, Nitrosomorpholine,and N-Nitrosodibutylamine.  Herbicides/Pesticides Lindane

Frequency Once every three (3) months (with onesample taken during the summer lowstream flow period and another taken duringthe winter low stream flow period)

Sample Type 3 Part Composite

Parameters Effluent Broad Scan Parameters

 Table 7 - Canagagigue Creek Secondary Surface Water Quality Monitoring

Locations At the west bank, east bank and middle ofthe stream for Transect MonitoringLocations SS+270, SS+385 and SS+770 asidentified in Figure 2.2 of Certificate ofApproval Amendment Application SupportDocument, Chemtura Co./Cie, Elmira,Ontario - Certificates of Approval No. 4-0166-90-938 and 4-0146-97-986 , preparedby Conestoga Rovers & Associates, dated

January 2007.

Frequency Once every three (3) months  (during lowstream flow periods and on the same dayPrimary Surface Water Quality sampling isconducted).

Sample Type 3 Part Discrete

Parameters General Chemistry Total Ammonia, pH, and Temperature.  Volatile Organic Compounds Benzene, Chlorobenzene, m,p-Xylenes,Toluene, and Trichloroethene.  Base/Neutral/Acid Extractables Aniline, Bis (2-ethylhexyl) Phthalate,Carboxin, N-Nitrosodiethylamine, N-Nitrosodimethylamine, Nitrosomorpholine,and N-Nitrosodibutylamine.  Herbicides/Pesticides Lindane.

Frequency Once every three (3) months  (with onesample taken during the summer low streamflow period and another taken during thewinter low stream flow period).

Sample Type 3 Part Discrete

Parameters Effluent Broad Scan Parameters

 (2) The Owner shall use best efforts to conduct receiver water sampling at the low flow periods asspecified in subsection (1).  For the purposes of this condition, best efforts means reviewingCanagagigue Creek stream flow records, long-term weather forecasts for the following month - topredict the most likely period when a low flow will occur in a given month - and carrying out themonitoring when the low flow is predicted.  (3) The 3 Part Composite sample collected at each of the sampling stations pursuant to subsection (1),shall consist of 3 equal volume grab samples, collected at the west bank, middle of stream and eastbank of the creek and depth integrated to account for difference in water depth, combined to form asingle 3 Part Composite sample for each sampling station.  (4) The individual 3 Part Discrete samples collected, at each of the west bank, middle of stream andeast bank, pursuant to subsection (1) shall consist of three (3) depth integrated grab samplescombined to form a single 3 Part Discrete sample for each of the sampling locations along eachMonitoring Transect Locations SS+270, SS+385 and SS+770.  (5) The methods and protocols for analysis and recording shall be the same as those identified inCondition 17(4) with analytical results to be available normally within two (2) weeks  of the date ofsample collection.   

(6) Notwithstanding the monitoring frequency outlined in Table 6 (Primary Surface Water QualityMonitoring), for all parameters except Total Ammonia, pH and Temperature, the monitoring frequencyfor each individual parameter may be reduced to once every six (6) months  provided that there havebeen no exceedances of a Provincial Water Quality Objective for that particular parameter after atleast twelve (12) months  of monitoring.  (7) Notwithstanding the monitoring frequency outlined in Table 7 (Secondary Surface Water QualityMonitoring), the monitoring frequency for each individual parameter may be reduced to once every six(6) months  provided that there have been no exceedances of a Provincial Water Quality Objective forthat particular parameter after at least twelve (12) months  of monitoring.  (8) Notwithstanding the monitoring outlined in Tables 6 and 7, Owner shall establish and maintain a pHand Temperature monitoring station in Canagagigue Creek at SS+380 and shall continuously measureand record the pH and Temperature of the creek.  The Owner shall include the pH and Temperaturedata collected pursuant to this condition with any other data reporting, pursuant to this Approval.  (9) The monitoring program required by this condition may be modified with the written concurrence ofthe Director after at least twenty-four (24) months  of monitoring upon the request of the Owner.   20. SEDIMENT TRANSPORT  (1) The Owner shall undertake sediment transport monitoring in the vicinity of the outfall toCanagagigue Creek at SS+890 to characterize existing or natural sediment transport and erosionconditions within the creek on a semi-annual basis.  (2) The observations/results of the monitoring pursuant to subsection (1) shall be included in theannual report of Condition 25.   21. RECEIVER BIOLOGICAL MONITORING PROGRAM  (1) The Owner shall undertake receiver biological monitoring (Bio-monitoring) for the ongoing and longterm assessment of impacts resulting from the Works and other related activities conducted on theChemtura site on the biota and habitats of Canagagigue Creek.   (2) Bio-monitoring using clams ( Elliptio complanata ) and leeches ( Nephelopsis obscura ) shall beundertaken: 

(a) at all stations outlined on Figure 1.1 of the 2006 Bio-monitoring Study using Clams ( Elliptiocomplanata ) and Leeches ( Nephelopsis obscura ) , dated September 2006, prepared by StantecConsulting Ltd.;  (b) at a frequency of once every two (2) years ; and  (c) consistent with the methods and protocols outlined in Section 3 of 2006 Bio-monitoring Studyusing Clams ( Elliptio complanata ) and Leeches ( Nephelopsis obscura ) , dated September 2006,prepared by Stantec Consulting Ltd.

 (3) Bio-monitoring Survey of benthic invertebrates shall be undertaken at the ten (10) depositionalsites shown on Figure 2-3 of the 2006 Receiver Biomonitoring Report for the Crompton Site in Elmira,Ontario , dated March 8, 2007, prepared by Stantec Consulting Ltd.  

(4) Bio-monitoring Survey of fish species shall be undertaken at the eight (8) stations shown on Figure2-4 of the 2006 Receiver Biomonitoring Report for the Crompton Site in Elmira, Ontario , dated March8, 2007, prepared by Stantec Consulting Ltd.  (5) The Bio-monitoring Surveys undertaken pursuant to subsections (3) and (4) shall be at a frequencyof once every two (2) years  and shall be consistent with the methods and protocols outlined inSection 2 of the 2004 Receiver Bio-monitoring Report for the Crompton Site in Elmira, Ontario , datedMarch 12, 2005, prepared by Stantec Consulting Ltd.  (6) Recommendations regarding changes to this program shall be submitted to the Regional Directorand the District Manager and the other relevant agencies, including Department of Fisheries andOceans, Department of the Environment, Ministry of Natural Resources and Grand River ConservationAuthority, for review and comment before implementation and shall be documented in the annualreport required by Condition 25.   22. GROUNDWATER MONITORING  (1) The Owner shall maintain the existing continuous water level recorders in the following monitoringwells and at Canagagigue Creek water level monitoring stations SS+385, SS+500 and SS+660 (asidentified on Figure 2.2 of Certificate of Approval Amendment Application Support Document,Chemtura Co./Cie, Elmira, Ontario - Certificates of Approval No. 4-0166-90-938 and 4-0146-97-986 ,prepared by Conestoga Rovers & Associates, dated January 2007): 

UOW+460 UOW+510 UOW+540

UOW+610 UOW+645 UOW+720

The Owner shall also maintain the existing creek water level monitoring stations adjacent toUOW+460, UOW+610 and UOW+720 and equip these stations with manual monitoring facilities tomeasure water levels within 0.01 metres.

 (2) The Owner shall continuously monitor the water levels at UOW+510, SS+500, UOW+645 andSS+660 such that an alarm is activated if the water levels in UOW+510 or UOW+645 raise to within 5centimetres of the water levels measured at corresponding SS+500 or SS+660.  This 5 centimetrecriteria may be amended with the written concurrence of the District Manager .  (3) The Owner shall record the water level of all UA1 and UA3 wells located on the Owner's propertysouth of Shirt Factory Creek and west of Canagagigue Creek, all creek water level monitoring stationsand the following Municipal Aquifer wells semi-annually : 

OW55-17 OW10-14 OW50-13 OW105-D OW18-13

 (4) The Owner shall plot groundwater contour maps and water level difference hydrographs forcontinuous monitors:

UOW+460 and SS+430 or SS+450A          

UOW+510 and SS+500

UOW+540 and SS+540                  

UOW+610 and SS+615

UOW+630 and SS+630                            

UOW+720 and SS+720

 using the information obtained in subsections (1) and (3), from the Shirt Factory Creek outlet tothe northern boundary of the Elmira Sewage Treatment Plant and shall submit copies of thesemaps and graphs, along with tables of supporting water level data, in the Annual Reports pursuantto Condition 25.

  23. NOTIFICATION  (1) One (1) week  prior to the start up of the operation of the Proposed Works, the Owner shall notifythe District Manager and the Regional Director (in writing) of the pending start up date.  (2) The Owner shall report to the District Manager or designate, any exceedance of any parameterspecified in Condition 7 orally, as soon as reasonably possible, and in writing within seven (7) days ofthe exceedance.   (3) In addition to the obligations under Part X of the Environmental Protection Act , the Owner shall,within ten (10) working days  of the occurrence of any reportable spill as defined in OntarioRegulation 675/98, bypass or loss of any product, by-product, intermediate product, oil, solvent, wastematerial or any other polluting substance into the environment, submit a full written report of theoccurrence to the District Manager describing the cause and discovery of the spill or loss, clean-upand recovery measures taken, preventative measures to be taken and schedule of implementation.   24. ROUTINE REPORTING  The Owner shall prepare and submit a monitoring and compliance report to the District Manager andthe Regional Director on a monthly basis, within fifteen (15) days  following the month being reportedupon. The reports shall contain, but shall not be limited to, the following information, received duringthe previous month, in a format and frequency acceptable to the District Manager and the RegionalDirector:  (a) a summary and interpretation of all treatment system monitoring data and analytical data receivedrelative to the Works during the reporting period and a comparison to the effluent quality objectivesand limits described in Conditions 6 and 7, where applicable;   (b) a tabulation and description of any bypass or upset conditions which occurred during the periodbeing reported upon;  (c) summary, interpretation and analysis of all collected surface water quality and correspondingstream flow data for any statistically significant trend of increasing parameter concentration over time,seasonal and/or stream flow related variations in surface water quality, including the assessment of

statistical difference pursuant to Condition 8(4) and recommendations concerning the need for furtherremediation or upper aquifer containment;  (d) summary of information outlining when the continuous water level monitors indicated a potentialloss of containment, duration of the potential loss of containment and a description of any correctiveaction taken;  (e) summary and interpretation of all toxicity data collected during the period of reporting; and  (f) The frequency of Routine Reporting may be revised from time to time with the concurrence of theDistrict Manager and the Regional Director.   25. ANNUAL PERFORMANCE REPORTING  The Owner shall prepare and submit a performance report  to the District Manager and the RegionalDirector on an annual basis, and the submission shall be made no later than February 28 th  of thefollowing calendar year.  The reports shall contain, but shall not be limited to, the following informationin a format acceptable to the District Manager and the Regional Director:  (a) a summary of all routine monitoring data and analytical data collected relative to the Works duringthe reporting period and a comparison to the effluent quality criteria described in Conditions 6 and 7,where applicable;  (b) a summary of all collected surface water quality and corresponding stream flow data for anystatistically significant trend of increasing parameter concentration over time, seasonal and/or streamflow related variations in surface water quality;  (c) summary and interpretation of all bio-monitoring and toxicity data collected during the period ofreporting with comparison of any results obtained from previous years;  (d) a description of any operating problems encountered and corrective actions taken during thereporting period;  (e) a summary of any proposed alteration, extension or replacement in the process or operation of theWorks to be completed over the next reporting period which may require approval under the OWRA;  (f) an evaluation of the calibration and maintenance procedures conducted on all monitoringequipment;  (g) an evaluation of the need for modifications to the Works to improve performance and reliability andto minimize upsets and bypasses;   (h) an evaluation of the hydraulic effectiveness of the containment wells.  (i) results from the sediment transport investigation required by Condition 20;   (j) an evaluation of the success and adequacy of the current groundwater remediation operations inachieving the goal of Ontario Drinking Water Objectives by the year 2028 and recommendations forany improvements, if needed; and  (k) any other information the District Manager and the Regional Director requires from time to time.   

  Schedule 'A' forms part of this Approval and contains a list of supporting documentation / informationreceived, reviewed and relied upon in the issuance of this Approval. 

SCHEDULE 'A'  1. Environmental Compliance Approval Number 2289-6Y2HNA , issued on October 19, 2007 .   2. Environmental Compliance Approval Application for Industrial Sewage Works  submitted by LuisAlmeida, of GHD Limited, and signed by Jeff Merriman, P.Eng., Environmental Remediation Manager,Chemtura Canada Co./Cie., dated August 20, 2015, and all supporting documentation andinformation. 

 

The reasons for the imposition of these terms and conditions are as follows:

 1. Condition 1 is imposed to ensure that the Works are built and operated in the manner in which theywere described and upon which approval was granted.  This condition is also included to emphasizethe precedence of Conditions in the Approval and the practice that the Approval is based on the mostcurrent document, if several conflicting documents are submitted for review.   Condition 1.(6) isincluded to emphasize that the issuance of this Approval does not diminish any other statutory andregulatory obligations to which the Owner is subject in the construction, maintenance and operation ofthe Works.  The condition specifically highlights the need to obtain any necessary conservationauthority approvals.  The condition also emphasizes the fact that this Approval doesn’t limit theauthority of the Ministry to require further information.  2. Condition 2 is included to ensure that the Ministry records are kept accurate and current withrespect to approved Works and to ensure that subsequent owners of the Works are made aware of theApproval and continue to operate the Works in compliance with it.  3. Condition 3 is included to ensure that the Works will be operated, maintained, funded, staffed andequipped in a manner enabling compliance with the terms and conditions of this Approval, such thatthe environment is protected and deterioration, loss, injury or damage to any person or property isprevented.  4. Condition 4 is included to ensure that a comprehensive operations manual governing all significantareas of operation, maintenance and repair is prepared, implemented and kept up-to-date by theOwner and made available to the Ministry.  Such a manual is an integral part of the operation of theWorks.  Its compilation and use should assist the Owner in staff training, in proper plant operation andin identifying and planning for contingencies during possible abnormal conditions.   The manual willalso act as a benchmark for Ministry staff when reviewing the Owner's operation of the Work.    5. Condition 5 is imposed to allow for the use of collected groundwater for cooling purposes at theplant but only in a manner that will not negatively impact the quality of the effluent being discharged tothe receiver.   6. Condition 6  is imposed to establish non-enforceable effluent quality objectives which the Owner isobligated to use best efforts to strive towards on an ongoing basis.  These objectives are to be used asa mechanism to trigger corrective action proactively and voluntarily before environmental impairmentoccurs and before the compliance limits of Condition 7 are exceeded.  7. Condition 7  is imposed to ensure that the effluent discharged from the Works to Canagagigue

Creek meets the Ministry's effluent quality requirements thus minimizing environmental impact on thereceiver.  8. Condition 8 is included to outline the conditions under which the Stream Water Quality ContingencyPlan must be implemented in order to ensure that impact on the receiver is minimized, to protectaquatic life and ensure reserve stream capacity for other users.  9. Condition 9 is included to ensure that hydraulic containment of the Upper Aquifer is maintained thusminimizing impact on the receiver.  10. Condition 10 is included to ensure that progress in the remediation of the groundwater underElmira is monitored and any corrective measures implemented so that the project will achieve the goalof meeting Ontario Drinking Water Standards.  11. Conditions 11, 12, 13, 14 and 15 are included to reflect the Optimization Principles developed bythe Remediation Advisory Committee (RAC), the Owner and the Ministry.  12. Conditions 16, 17 and 18 are included to require the Owner to demonstrate on a continual basisthat the quality and quantity of the effluent from the approved Works is consistent with the designobjectives and effluent limits specified in the Approval and that the approved Works does not causeany impairment to the receiving watercourse.  13. Condition 19 is included to enable the Owner to demonstrate the impact of effluent discharges onthe quality of the receiving watercourse.  14. Conditions 20 and 21 are included in order that the Owner may define and demonstrate the impactof effluent discharges on the quality of the receiver to ensure compliance to the Ministry's policies andguidelines.  15. Condition 22 is included to outline the monitoring requirements necessary to assess theeffectiveness of the Upper Aquifer containment system.  16. Conditions 23, 24 and 25 are included to provide a performance record for future references and toensure that the Ministry is made aware of problems as they arise, so that the Ministry can work withthe Owner in resolving the problems in a timely manner. Upon issuance of the environmental compliance approval, I hereby revoke ApprovalNo(s). 2289-6Y2HNA  issued on October 19, 2007.

 In accordance with Section 139 of the Environmental Protection Act, you may by written Notice servedupon me and the Environmental Review Tribunal within 15 days after receipt of this Notice, require ahearing by the Tribunal. Section 142 of the Environmental Protection Act provides that the Noticerequiring the hearing shall state:  1. The portions of the environmental compliance approval or each term or condition in theenvironmental compliance approval in respect of which the hearing is required, and; 2. The grounds on which you intend to rely at the hearing in relation to each portion appealed.  Pursuant to subsection 139(3) of the Environmental Protection Act, a hearing may not be required withrespect to any terms and conditions in   this environmental compliance approval, if the terms andconditions are substantially the same as those contained in an approval that is amended or revoked bythis environmental compliance approval.    

The Notice should also include:  3. The name of the appellant; 4. The address of the appellant; 5. The environmental compliance approval number; 6. The date of the environmental compliance approval; 7. The name of the Director, and; 8. The municipality or municipalities within which the project is to be engaged in.  And the Notice should be signed and dated by the appellant.  This Notice must be served upon:  

The Secretary* Environmental Review Tribunal 655 Bay Street, Suite 1500 Toronto, Ontario M5G 1E5

AND

The Director appointed for thepurposes of Part II.1 of theEnvironmental Protection Act Ministry of the Environment andClimate Change 135 St. Clair Avenue West, 1stFloor Toronto, Ontario M4V 1P5

 * Further information on the Environmental Review Tribunal’s requirements for an appeal canbe obtained directly from the Tribunal at: Tel: (416) 212-6349, Fax: (416) 326-5370 orwww.ert.gov.on.ca  The above noted activity is approved under s.20.3 of Part II.1 of the Environmental Protection Act. 

DATED AT TORONTO this 15th day of March, 2016Fariha Pannu, P.Eng. Director appointed for the purposes of Part II.1 ofthe Environmental Protection Act

AA/ c: District Manager, MOECC Guelph District Office Luis Almeida, GHD Limited