Upload
others
View
21
Download
0
Embed Size (px)
Citation preview
COMPLETE TEARDOWN WITH:
• Detailed photos and cross-sections
• Precise measurements
• Material analysis
• Manufacturing process flow
• Supply chain evaluation
• Manufacturing cost analysis
• Estimated sales price
• Comparison with NVIDIA Tesla and TSMC CoWoS
AMD Radeon Vega Frontier Edition
Title: AMD Radeon Vega with HBM2
Pages: 130
Date: November 2017
Format: PDF & Excel file
Price: Full report: EUR 3,490
New GPU is AMD’s first with Samsung 8-Hi second generation high bandwidth memory and the latest 2.5D chip-on-wafer packaging from SPIL
Two years after the release of the Radeon Fury X, using the world’s first on-chipintegrated high bandwidth memory (HBM), at CES 2017, AMD presented theRadeon Vega graphics procession unit (GPU), featuring second generation HBM(HBM2). We have analyzed the Radeon Vega Frontier Edition, which can do 13 or25 trillion floating point operations per second (TFLOPS) depending on thefloating point format. The GPU has a 16GB high bandwidth cache, assembledfrom two 8-Hi HBM2 stacks.
In a smaller, 47x47mm 10-layer flip-chip ball grid array (fcBGA) package, thecomponent uses more than 2,800mm² of silicon, an impressive silicon-to-packageratio.
Compared to NVIDIA, which uses only TSMC to manufacture the Pascal GPU, AMDhas chosen to use multiple sources to produce the Vega GPU. The GPU die is madeby GlobalFoundries with a 14nm FinFET process, giving it 12.5 billion transistors.The interposer, with via-middle through silicon via (TSV) technology, is provided byUMC, which was also the provider for the Radeon Fury X. The 2.5D assembly of thecomponent is done by two sources, with Taiwan’s SPIL estimated to be the mainone. It uses SPIL's ‘CoW-last’ Chip-on-Wafer after Through-Silicon Interposerprocess.
Regarding the HBM2, only two stacks of 8GB are used to obtain the 16GB capacity.As for NVIDIA’s GPUs, Samsung is the provider of the HBM2 stacks, whereas SK-Hynix was the supplier for previous Radeon Fury X. The 8GB HBM2 consists of eight1GB HBM2 dies and a buffer die at the bottom of the stack, which are all verticallyinterconnected by TSVs and microbumps.
The report includes a complete physical analysis of the packaging process, withdetails on all technical choices regarding processes, equipment and materials. Also,the complete manufacturing supply chain is described and manufacturing costs arecalculated.
The report compares the Radeon Vega solution with NVIDIA’s Tesla P100,highlighting the integration choices made by both companies. Also, the reportfeatures a comparison with AMD’s Fury X, which uses HBM1 and 2.5D assembly, toexplain the interest in evolution through the HBM2 and CoW 2.5D platforms.
TABLE OF CONTENTS
Overview / Introduction
Company Profile and Supply Chain
Physical Analysis
• AMD Radeon Vega Frontier Edition Teardown
• Package
View, dimensions and marking Die sizes
• DRAM Die
View, dimensions and marking µBumps and TSVs
• Package Cross-Section
Laminate and frame cross-section
Interposer cross-section GPU cross-section 8-Hi HBM2 stack cross-section
• Comparison with AMD Fury X including SK-Hynix HBM1
• Comparison with NVIDIA Tesla P100 including Samsung 4-Hi HBM2
Manufacturing Process Flow
• Global Overview
• GPU Process Description
• HBM2 Stack Process Flow
• Interposer Process Flow
• CoW and Final Assembly
Process Flow
Cost Analysis
• Overview of the Cost
Analysis
• Yield Hypotheses
• GPU Front-End and Die Cost
• Interposer Wafer and Die
Cost
• DRAM Front-End Cost TSV manufacturing cost Micro-bumping
manufacturing cost
• DRAM Die Cost
• Logic Die Cost
• 8-Hi HBM Stack Cost
• CoW Assembly
Manufacturing Cost
• Final Component Cost
Estimated Price Analysis
Performed byPerformed by
AUTHORS:
charge of structure analysis ofsemiconductors. She has deepknowledge of chemical andphysical technical analyses. Shepreviously worked for 20 yearsat Atmel’s Nantes Laboratory.
VéroniqueLe Troadec(Lab)
Véronique is in
analyses for AdvancedPackaging, MEMS and IC. He haspublished numerous reports onadvanced packaging devicesincluding fan-in and fan-outWLP, embedded die packagingand 3D TSV packaging.
Romain Fraux
R o m a i n i s i ncharge of costing
3D Package CoSim+
IC Price +
ANALYSIS PERFORMED WITH OUR COSTING TOOLS 3D PACKAGE COSIM+ AND IC PRICE+
System Plus Consulting offerspowerful costing tools toevaluate the production cost &selling price from single chip tocomplex structures.
IC Price+
The tool performs the necessarycost simulation of any IntegratedCircuit: ASICs, microcontrollers,memories, DSP, smartpower…
3D Package Cosim+
Cost simulation tool to evaluatethe cost of any Packagingprocess: Wafer-level packaging,TSV, 3D integration…
ANNUAL SUBSCRIPTION OFFER
You can choose to buy over 12 months a set of 3, 4, 5, 7, 10 or
15 Reverse Costing® reports.
Up to 47% discount!
• MEMS & Sensors:
Accelerometer - Compass - Display /Optics - Environment - Fingerprint -Gyroscope - IMU/Combo - Light -Microphone - Oscillator - Pressure sensor
• Power:
GaN - IGBT - MOSFET - Si Diode - SiC
• Systems:
Automotive - Consumer - Energy -Medical - Telecom
Each year System Plus Consulting releases a comprehensive collection of new reverse engineering &costing analyses in various domains.
• Imaging:
Infrared - Visible
• Integrated Circuits & RF:
Integrated Circuit (IC) - RF IC
• LEDs:
LED Lamp - UV LED - White/blue LED
• Packaging:
3D Packaging - Embedded - SIP - WLP
More than 60 reports released each year on the following topics (considered for 2017):
Performed by
RELATED REPORTS
NVIDIA Tesla P100 Graphics Processing Unit
(GPU) with HBM2
Sony IMX400 Tri-layer Stacked CIS with Integrated
DRAM and DSP
NXP SCM-i.MX6 Quad High Density Fan-Out Wafer-Level
System-in-Package
Includes 3D stacked memory with2.5D integration on a siliconinterposer in a Chip-on-Wafer-on-Substrate (CoWoS) process.
A closer look at the impressive,industry-first, tri-layer stacked CIS.This innovative CIS is Sony’s nextgeneration technology.
The 1st ultra-small multi-die lowpower module with boot memoryand power management integratedin a PoP compatible device for theIoT.
Pages: 130Date: October 2017Full report: EUR 3,490*
Pages: 130Date: July 2016Full report: EUR 3,490*
Pages: 132Date: June 2017Full report: EUR 3,490*
ORDER FORM
Performed by
DELIVERY on receipt of payment:
By credit card:Number: |__|__|__|__| |__|__|__|__| |__|__|__|__| |__|__|__|__|
Expiration date: |__|__|/|__|__| Card Verification Value: |__|__|__|
By bank transfer:HSBC - CAE- Le Terminal -2 rue du Charron - 44800 St Herblain FranceBIC code: CCFRFRPP
In EURBank code : 30056 - Branch code : 00955 - Account : 09550003234 IBAN: FR76 3005 6009 5509 5500 0323 439
In USDBank code : 30056 - Branch code : 00955 - Account : 09550003247 IBAN: FR76 3005 6009 5509 5500 0324 797
Return order by: FAX: +33 2 53 55 10 59MAIL: SYSTEM PLUS CONSULTING
21 rue La Nouë Bras de Fer44200 Nantes – France
Contact: EMAIL: [email protected]: +33 2 40 18 09 16
BILLING CONTACT
ABOUT SYSTEM PLUS CONSULTING
Name (Mr/Ms/Dr/Pr):......................................................................................Job Title:......................................................................................Company:......................................................................................Address:......................................................................................City: State:......................................................................................Postcode/Zip:......................................................................................Country:......................................................................................VAT ID Number for EU members: ......................................................................................Tel:......................................................................................Email:.....................................................................................
Date:.......................................................................................Signature:......................................................................................
First Name: ..................................................................Last Name: ...................................................................Email:............................................................................Phone:...........................................................................
SHIP TO PAYMENT
Please process my order for “AMD Radeon Vega with HBM2” Reverse Costing Report
Full Reverse Costing report: EUR 3,490*
Annual Subscription (including this report as the first of the year):
System Plus Consulting is specialized in the cost analysis of electronics from semiconductor devices to electronic systems. A complete range of services and costing tools to provide in-depth production cost studies and to estimate the objective selling price of a product is available.
Our services:
TECHNOLOGY ANALYSIS - COSTING SERVICES - COSTING TOOLS - TRAININGS
www.systemplus.fr - [email protected]
o 3 reports EUR 8 400*o 5 reports EUR 12 500*
o 7 reports EUR 16 000*o 10 reports EUR 21 000*o 15 reports EUR 27 500*
*For price in dollars please use the day’s exchange rate *All reports are delivered electronically in pdf format *For French customer, add 20 % for VAT*Our prices are subject to change. Please check our new releases and price changes on www.systemplus.fr. The present document is valid 6 months after its publishing date: November 2017
Ref.: SP17360
TERMS AND CONDITIONS OF SALES
1.INTRODUCTIONThe present terms and conditions apply to the offers, sales and deliveries of services managed by System Plus Consultingexcept in the case of a particular written agreement.Buyer must note that placing an order means an agreement without any restriction with these terms and conditions.
2.PRICESPrices of the purchased services are those which are in force on the date the order is placed. Prices are in Euros and workedout without taxes. Consequently, the taxes and possible added costs agreed when the order is placed will be charged onthese initial prices.System Plus Consulting may change its prices whenever the company thinks it necessary. However, the company commitsitself in invoicing at the prices in force on the date the order is placed.
3.REBATES and DISCOUNTSThe quoted prices already include the rebates and discounts that System Plus Consulting could have granted according to thenumber of orders placed by the Buyer, or other specific conditions. No discount is granted in case of early payment.
4.TERMS OF PAYMENTSystem Plus Consulting delivered services are to be paid within 30 days end of month by bank transfer except in the case of aparticular written agreement.If the payment does not reach System Plus Consulting on the deadline, the Buyer has to pay System Plus Consulting a penaltyfor late payment the amount of which is three times the legal interest rate. The legal interest rate is the current one on thedelivery date. This penalty is worked out on the unpaid invoice amount, starting from the invoice deadline. This penalty issent without previous notice.When payment terms are over 30 days end of month, the Buyer has to pay a deposit which amount is 10% of the total
invoice amount when placing his order.
5. OWNERSHIPSystem Plus Consulting remains sole owner of the delivered services until total payment of the invoice.
6.DELIVERIESThe delivery schedule on the purchase order is given for information only and cannot be strictly guaranteed. Consequentlyany reasonable delay in the delivery of services will not allow the buyer to claim for damages or to cancel the order.
7.ENTRUSTED GOODS SHIPMENTThe transport costs and risks are fully born by the Buyer. Should the customer wish to ensure the goods against lost ordamage on the base of their real value, he must imperatively point it out to System Plus Consulting when the shipment takesplace. Without any specific requirement, insurance terms for the return of goods will be the carrier current ones(reimbursement based on good weight instead of the real value).
8.FORCE MAJEURESystem Plus Consulting responsibility will not be involved in non execution or late delivery of one of its duties described inthe current terms and conditions if these are the result of a force majeure case. Therefore, the force majeure includes allexternal event unpredictable and irresistible as defined by the article 1148 of the French Code Civil?
9.CONFIDENTIALITYAs a rule, all information handed by customers to system Plus Consulting are considered as strictly confidential.A non-disclosure agreement can be signed on demand.
10.RESPONSABILITY LIMITATIONThe Buyer is responsible for the use and interpretations he makes of the reports delivered by System Plus Consulting.Consequently, System Plus Consulting responsibility can in no case be called into question for any direct or indirect damage,financial or otherwise, that may result from the use of the results of our analysis or results obtained using one of our costingtools.
11.APPLICABLE LAWAny dispute that may arise about the interpretation or execution of the current terms and conditions shall be resolvedapplying the French law.It the dispute cannot be settled out-of-court, the competent Court will be the Tribunal de Commerce de Nantes.
Performed by