Alternate Bidding & Asphalt Price Adjustment Pat Gardiner Bureau Of Maintenance And Operations 1

Alternate Bidding & Asphalt Price Adjustment

Embed Size (px)

DESCRIPTION

Alternate Bidding & Asphalt Price Adjustment. Pat Gardiner Bureau Of Maintenance And Operations. Why. Concept. Market Conditions Control Concrete Vs Asphalt Fostered By The Concrete Industry LCCA Process No Longer Determines Pavement Type WIN - WIN For PennDOT And Industry - PowerPoint PPT Presentation

Citation preview

Page 1: Alternate Bidding &  Asphalt Price Adjustment

1

Alternate Bidding & Asphalt Price Adjustment

Pat GardinerBureau Of Maintenance And Operations

Page 2: Alternate Bidding &  Asphalt Price Adjustment

2

Why

Time

Quantity

Page 3: Alternate Bidding &  Asphalt Price Adjustment

3

ConceptMarket Conditions Control

Concrete Vs Asphalt

Fostered By The Concrete Industry

LCCA Process No Longer Determines Pavement Type

WIN - WIN For PennDOT And Industry

Lower Prices Thru Competition

Page 4: Alternate Bidding &  Asphalt Price Adjustment

4

Criteria

Sol 465-09-3

Applies To Structural

Improvements

Interstates Over $3 Million

Other Facilities Over $15 Million

Page 5: Alternate Bidding &  Asphalt Price Adjustment

5

The “C” FactorIncludes

Future Maintenance Costs

User Delay Costs

Residual Life DiscountAC Lifecycle = 50 YrsConcrete Lifecycle = 55 Yrs

Page 6: Alternate Bidding &  Asphalt Price Adjustment

6

Design OptionsPennDOT Embraced Alternate Bidding To Save Money

Plans Can Show:1 Alternate Pavement Design0 Alternate Pavement DesignsBoth Alternate Pavement Design

Not Recommending Designing Both Alternates Based On Cost

Page 7: Alternate Bidding &  Asphalt Price Adjustment

7

The List3R & 4R ProjectsColumbia Co SR 80 Sec 078Allegheny Co SR 28 Sec A09Allegheny Co SR 28 Sec A10Washington Co SR 70 Sec Y20Bucks Co SR 95 Sec TPKSomerset Co SR 6219 Sec 020Monroe Co SR 209 Sec 007

Page 8: Alternate Bidding &  Asphalt Price Adjustment

8

FutureFocus Is On Preservation

Limited Dollars

Bridge Priority

Open Plan Schedules To Include

Pavement Design

Page 9: Alternate Bidding &  Asphalt Price Adjustment

9

Asphalt Price AdjustmentWho Cares

Adjustments Made Based On Monthly Index When Material Is Placed vs The Index In The Proposal

Page 10: Alternate Bidding &  Asphalt Price Adjustment

10

LCCAAC Adjustment Factor

Previously Calculated Based On

Amount Paid For Projects Closed

Out In Last 6 Months

This Yields Untimely Factors

Page 11: Alternate Bidding &  Asphalt Price Adjustment

11

LCCANew Process

AC Adjustments EARNED In Last

12 Months

New Factor Calculated On 6

Month Basis

Data Is Used In Calculation Of

“C” Factor

Page 12: Alternate Bidding &  Asphalt Price Adjustment

12

Questions