Upload
malcolm-hudson
View
217
Download
0
Embed Size (px)
Citation preview
Alpine Technical Delegates Update 2008 1
INTERNATIONAL SKI FEDERATION
Timing & DataTechnical Report Form
Version 7.1
Alpine Technical Delegates Update 2008 2
Timing & Data Technical Report
Alpine Technical Delegates Update 2008 3
•Codex or Race Code
•Event
•Gender
CODEX
•Note the “check boxes”
Alpine Technical Delegates Update 2008 4
Race Site and StateNationEvent Name Date (dd/mm/yy)
Location
Alpine Technical Delegates Update 2008 5
Equipment
Sys Timer ASys Timer BStart GateFinish Cell AFinish Cell B
•Brand Name •Model or Type•Serial Number •Homologation #
Alpine Technical Delegates Update 2008 6
Equipment
Timers BrandModelSerial No.Homol. #
TAG HEUERPTB 605388TAG.005.97
Alpine Technical Delegates Update 2008 7
Equipment
Start Gate
BrandModelSerial No.Homol. #
TAG HEUERHL 7.1196TAG.S54.03
Alpine Technical Delegates Update 2008 8
Equipment
Photo Cells BrandModelSerial No.Homol. #
TAG HEUERHL.7.1196TAG.S54.03
Alpine Technical Delegates Update 2008 9
Software
Software &ResultsPreparation
BrandVersionDateResults=Tapes
Split SecondNational/FISRev. 1- 3/08Confirmed
Alpine Technical Delegates Update 2008 10
Connections
How do we communicate signals/data from Start to Finish?
How is voice communication handled between Start and Finish?
CableRadioSnowmobileSki LiftSkier??
Alpine Technical Delegates Update 2008 11
Warm-up and Synchronization
At what time is the run scheduled to start?
--Is there a rule about Synchronization?
--What is the minimum recommended warm up time?
Is there a Maximum?
Alpine Technical Delegates Update 2008 12
Synchronization and Synch + 1 Minute
•Are Systems A and B synchronized?
–How close are they?
•What is the maximum difference acceptable?–So what?
•What about Hand Times?–So what?