SL _No. Company MHS District Total MW Location River G.O .No Date of Allotment 1994-1995 1 Bhoruka Power Corporation Ltd. Kumaradhara Dakshina Kannada 18.00 Kumaradhara MHS across Kumaradhara river at Kunturu village of Putturu Taluk in Dakshina kannada district Kumaradh ara river DE 154 PPC 94(3) dated 6.9.1994 Capacity reduced and re allotted Vide G.O No. EN 206 NCE 2007dated 29.6.2007 06-09-1994 2 Sai Deepthi Power Pvt. Ltd. Bhadra LBC Shimoga 1.50 Bhadra LBC MHS across Bhadra LBC near BR project of Bhadravathi taluk in shimoga District Bhadra river DE 154 PPC 94(C) dated 06/09/1994(1.5 MW to M/s Arun Engineering Projects (P) Ltd. ME155 NCE 2005 dated 16/06/2005(change of name to M/s Arun Engineering projects (P) Ltd., ME 278 NCE 2004 dated 18/08/2004( upto ), EN 117 NCE 2006 dated 06/03/2006( upto), EN 518 NCE 2008 dated 08/05/2009(cancelled), EN 582 NCE 2009 dated 28/02/2011(Restoration, upto 31/12/2015),Time Extended vide GO.No. EN 77 NCE 2016,dt: 27.04.2016 from 01.10.2016 to 31.12.2016. 06-09-1994 Total 19.50 1996-1997 LIST OF SMALL HYDRO PROJECTS ALLOTTED YEARWISE AS ON 31.10.2017.

Allotted to be Commissioned

  • Upload
    vankien

  • View
    265

  • Download
    3

Embed Size (px)

Citation preview

Page 1: Allotted to be Commissioned

SL _No. Company MHS District Total MW Location River G.O .NoDate of

Allotment

1994-1995

1

Bhoruka Power

Corporation Ltd. Kumaradhara Dakshina

Kannada18.00

Kumaradhara MHS

across Kumaradhara

river at Kunturu village

of Putturu Taluk in

Dakshina kannada

district

Kumaradh

ara river

DE 154 PPC 94(3) dated

6.9.1994 Capacity reduced and

re allotted Vide G.O No. EN 206

NCE 2007dated 29.6.2007

06-09-1994

2 Sai Deepthi Power Pvt. Ltd. Bhadra LBC Shimoga 1.50

Bhadra LBC MHS across

Bhadra LBC near BR

project of Bhadravathi

taluk in shimoga District

Bhadra

river

DE 154 PPC 94(C) dated

06/09/1994(1.5 MW to M/s

Arun Engineering Projects (P)

Ltd. ME155 NCE 2005 dated

16/06/2005(change of name to

M/s Arun Engineering projects

(P) Ltd., ME 278 NCE 2004 dated

18/08/2004( upto ), EN 117 NCE

2006 dated 06/03/2006( upto),

EN 518 NCE 2008 dated

08/05/2009(cancelled), EN 582

NCE 2009 dated

28/02/2011(Restoration, upto

31/12/2015),Time Extended vide

GO.No. EN 77 NCE 2016,dt:

27.04.2016 from 01.10.2016 to

31.12.2016.

06-09-1994

Total 19.50

1996-1997

LIST OF SMALL HYDRO PROJECTS ALLOTTED YEARWISE AS ON 31.10.2017.

Page 2: Allotted to be Commissioned

3 V Pram Power Co. Devaraya Mandya 0.50

Devaraya MHS Devaraya

Anicut, Majjigapura

Village, Sri

Rangapattana,

DE 28 NCE 96 (25) dated

24.7.1996, EN 383 NCE 2005

dt: 16.12.2005, EN 300 NCE

2007 dt: 27.10.2007, EN 162

NCE 2010 Dt: 26.02.2011,

EN 29 NCE 2012 dt:

28.01.2012, Final time

extension from 01.01.2012 to

31.12.2013. Time extended

vide GO.No. EN 100 NCE

2012 dt: 16.01.2015 from

01.01.2014 to 31.12.2015.

24-07-1996

4Vijayalakshmi Hydro

Power Pvt. Ltd.(unit -2)Hebbakavadi Mandya 1.25

Hebbakavadi MHS

across Hebbakavadi

Branch Canal of

Gopanahalli village of

Malavalli Taluk in

Mandya District

CauveryDE 56 NCE 95 dated

16/02/ 199616.02.1996

Page 3: Allotted to be Commissioned

5Parpikala Power Pvt.

Ltd.Parpikala

Dakshina

Kannada9

Parpikala MHS across

Shisila stream at

Parpikala village of

Beltangadi taluk in

Dakshina Kannada

District

Shisila/k

apila

Stream

DE 28 NCE 96 (8) dated

24/07/1996(6.5 MW), DE

173 NCE 2000 dated

11/12/2001(9.5 MW), DE

222 NCE 2004 dated

09/07/2004(from

25/08/2005 to 24/08/2008)

EN 438 NCE 2007 dated

04/01/2008(from

25/08/2008 24/08/2011)EN

131 NCE 2011

Dt:07.02.2013(Time

extension) 24.08.2011.to

31.12.2014, Cancelled vide

GO.No. EN 46 NCE 2014, dt:

07.08.2015. Restored vide

GO. No. 276 NCE 2015 dt:

30.01.2016 and Time

extended for 36 months from

the date of Government

Order.

24.07.1996

Page 4: Allotted to be Commissioned

6Pushpagiri Power Pvt.

Ltd. Harthuhole kodagu 19.5

Harthuhole MHS

across Kumaradhara

river at Harthuhole

village, Mallahalli falls

in Somawarapet Taluk

in Kodagu District

Kumarad

hara

river

DE 28 NCE 96 (19) dated

24/07/1996 (4 MW), DE 209

NCE 2002 dated 18/05/2004

(19.5 MW), EN 438 NCE

2007 dated 04/01/2008 (

from 20/02/2008 to

20/02/2011) EN 131 NCE

2011 Dt:07.02.2013(Time

extension) 20.02.2011.to

31.12.2014,Cancelled vide

GO.No. EN 46 NCE 2014, dt:

07.08.2015. Restored vide

GO. No. 276 NCE 2015 dt:

30.01.2016 and Time

extended for 36 months from

the date of Government

Order.

24.07.1996

7 Kodagu Power Pvt. Ltd.Balayantrah

ole Kodagu 6

Balayantrahole MHS

across Balayantrahole

at Chelavara village of

Virajapete Taluk in

Kodagu district

Balayant

rahole

DE 28 NCE 96 (21) dated

24/07/1996(3 MW), ED 32

NCE 2007 dated

27/03/2007(6 MW), EN 14

NCE 2008 dated

22/01/2008(36 months)EN

131 NCE 2011

Dt:07.02.2013(Time

extension) 21.01.2011.to

31.12.2014,Cancelled vide

GO.No. EN 46 NCE 2014, dt:

07.08.2015. Restored vide

GO. No. 276 NCE 2015 dt:

30.01.2016 and Time

extended for 36 months from

the date of Government

Order.

24.07.1996

Page 5: Allotted to be Commissioned

Total 36.25

1997-1998

NIL 0.00

Total 3.00

1999-2000

8Asia Pacific Industries

Ltd.Subramanya

Dakshina

Kannada0.5

Subramanya MHS

across Subramanya

hole of Sulya taluk in

Dakshina Kannada

District

Subrama

nya

Stream

DE 132 NCE 97 dated

20/04/1999(0.5 MW), EN 25

NCE 2007 dated

27/03/2007( Cancelled), EN

13 NCE 2008 dated

22/01/2008(Re allotted &

time extension- 36

months)EN 131 NCE 2011

Dt:07.02.2013(Time

extension) 22.01.2011.to

31.12.2014,Cancelled vide

GO.No. EN 46 NCE 2014, dt:

07.08.2015. Restored vide

GO. No. 276 NCE 2015 dt:

30.01.2016 and Time

extended for 36 months from

the date of Government

Order.

20.04.1999

Total 0.50

2000-2001

Page 6: Allotted to be Commissioned

9Dakshina Kannada

Power Pvt. Ltd.

Kempuhole

Gundia

Dakshina

Kannada24

Kempuhole Gundia

MHS across Kemp

Hole of Sakaleshapura

Taluk in Hassan

Distrct & Puttur taluk

in Dakshina Kannada

District

Yettinaho

le/Kemp

uhole/G

undiahol

e

DE 109 NCE 2000 (1) dated

12/01/2001(24 MW), EN 35

NCE 2005 dated

03/03/2005(36 months), EN

438 NCE 2007 dated

04/01/2008 (from

03/03/2008 to 03/03/2011),

Final Time extended vide

GO.No. EN 131 NCE 2011 dt:

07.02.2013 till 31.12.2014,

Cancelled vide GO.No. EN 46

NCE 2014, dt: 07.08.2015.

Restored vide GO. No. 276

NCE 2015 dt: 30.01.2016 and

Time extended for 36 months

from the date of Government

Order.

12.01.2001

Page 7: Allotted to be Commissioned

10 GCI Power Pvt. Ltd. Elaneeru Dakshina

Kannada2

Elaneeru MHS across

Elaneeru stream at

Elaneeru village of

Belthangadi Taluk in

Dakshina Kannada

District

Elaneeru

Stream

DE 109 NCE 2000 (5) dated

12/01/2001( 2 MW), EN 34

NCE 2003 dated

03/03/2003(36 months), EN

438 NCE 2007 dated

04/03/2008(from

03/03/2008 to

03/03/2011)EN 131 NCE

2011 Dt:07.02.2013(Time

extension) 02.03.2011.to

31.12.2014,Cancelled vide

GO.No. EN 46 NCE 2014, dt:

07.08.2015. Restored vide

GO. No. 276 NCE 2015 dt:

30.01.2016 and Time

extended for 36 months from

the date of Government

Order.

12.01.2001

Total 26.00

2001-2002

11Pavanaganga Power Pvt.

Ltd.

Honnammana

hallaChikkamagalore 6.00

Honnammanahalla MHS

across

HonnammanaHalla in

Attigundi village of

Chikkamagalore Taluk in

Chikkamagalore District

Honnamm

anahalla

Stream

DE 107 NCE 2001(1) dated

19/09/2001(1.5 MW)EN 123

NCE 2004 dated 24/08/2004(1.5

to 4.1 MW) EN 367 NCE 2006

dated 12/09/2006(4.1 to 6 MW)

19-09-2001

Page 8: Allotted to be Commissioned

12 Bhadragiri Power Pvt. Ltd. Gondi Shimoga 3.00

Gondi MHS across

Gondhi anicut at

Chikkagopanahalli

Village of Bhadravathi

taluk in Shimoga district

Bhadra

river

DE 111 NCE 2001 dated

08/10/2001( 1 MW) & EN 449

NCE 2004 dated 30/12/2004 ( 3

MW), EN 255 NCE 2005 dated

16/12/2005 ( change in location

), EN 167 NCE 2010 dated

28/02/2011 (upto

30/06/2011),Time extended vide

Go.No. EN 174 NCE 2016

dt:28.07.2016 from 01.07.2011

to 30.06.2016 with performance

guarantee of Rs. 1 Lakh Per MW.

08-10-2001

13Photon Energy Systems

Ltd.Yegachi Hassan 1.00

Yegachi MHS across

water from irrigationc

canal of yegachi river at

Belur town in Hassan

District

Yegachi

river

DE 66 NCE 1001(3) dt:

29.11.01,EN 362 NCE 2009 dt

12/3/2010(1 MW), EN 362 NCE

2009 dt 12/03/2010(Reallotted)

29-11-2001

14Photon Energy Systems

Ltd.Hosaholalu Mandya 0.50

Hosaholalu MHS across

Doddakere tank at

Hosaholalu Village of KR

Pet Taluk in Mandya

District

Doddakere

tank

DE 66 NCE 2001 (2) dated

29/11/2001(0.5 MW), EN 357

NCE 2005 dated

01/10/2006(Cancellation), EN

58 NCE 2007(2) dated

24/08/2007 (Re allotted)

29-11-2001

15Photon Energy Systems

Ltd.Sampkatte Shimoga 3.50

Sampakatte MHS across

Chakra water conduting

channel at Sampakatte

Village of Hosanagar

Taluk in Shimoga

District

Chakra

river

DE 66 NCE 2001 (1) dated

29/11/2001(3.5 MW), EN 357

NCE 2005 dated

01/07/2006(Cancellation), EN

58 NCE 2007(1) dated

24/08/2007 (Re allotted)

29-11-2001

Total 14.00

2002-2003

Page 9: Allotted to be Commissioned

16

Sangameshwara Energy (P)

Ltd. (Formerly Ceebros

Power Gen Ltd.,)

sanapur Bellary 9.00

Across Tungabhadra 1

KM D/S of Sanapur

village, Hospet taluk

Thungabh

adra river

DE 39 NCE 2002 dated

13.6.2002 EN 304

NCE 2008 dated

3/12/2008(Change of Company

name from M/s Ceebros Power

Generation Pvt Ltd to M/s

Sangameshwara Energy (P) Ltd

and capacity enhanced from 1.5

MW to 9 MW and 2 Years time

extension from 03.12.2008 i.e.

upto 02.12.2010) Corrigendum

EN 304 NCE 2008 dated

30.12.2008 (Change of

Geographical Co-ordinates)

13-06-2002

17

Pioneer Genco Ltd.

(Formerly Chanakya

Cements Ltd)

Budikatte Mandya 24.75

Budikatte MHS across

Cauvery river 2 KM of

downstream of

Shivanasamudram at

Nettakallu village of

Malavalli Taluk in

Mandya District

Cauvery

river

DE 33 NCE 2002 dated

13/06/2002(2 MW) & EN 152

NCE 2007 dated

30/04/2007 (24.75 MW) and

Change of MHS to Adi

Shakthi Maramma from

Budikatte MHS and change of

Company name as M/s.

Pioneer Gaenco Limited.

13-06-2002

18Penna Cements Industries

Ltd.

Sreeramadeva

ra Mandya 24.75

Sreeramadevara MHS

across Handihalla stream

2KM downstream of

Shivansamudram

mlavalli Taluk in Mandya

district

Handihalla

Stream

DE 37 NCE 2002 dated

13/06/2002

13-06-2002

Page 10: Allotted to be Commissioned

19 Shivanasamudram

Chikkamutti

raya MHS

(formerly

Gaganachuk

ki LBC)

Mandya 20.00

Left Bank canal of

Gaganachukki scheme-2

near Shivanasamudram

falls of Kollegala Taluk in

Chamarajanagara

District

Cauvery

river

DE 70 NCE 2002 dated

11/07/2002(4 MW), EN 26 NCE

2006 dated 27/01/2006(36

Months), EN 434 NCE 2007

dated 11/12/2007, EN 303 NCE

2011 dated 07.09.2011 (24.75

MW)

11-07-2002

20 Shivanasamudram

Basaveshwar

a MHS

(Formerly

Gaganachuk

ki RBC)

Chamarajanaga

r 24.75

Right Bank canal of

Ganganachukki scheme-

2 near

Shivanasamudram falls

of Kollegala Taluk in

Chamarajanagara

District

Cauvery

river

DE 70 NCE 2002 dated

11/07/2002(4 MW), EN 26 NCE

2006 dated 27/01/2006(36

Months), EN 434 NCE 2007

dated 11/12/2007, EN 303 NCE

2011 dated 07.09.2011

(enhanced 4 MW to 24.75 MW

and change of name) (upto

27/01/2012)

11-07-2002

21Indra Dhanursh Power Pvt.

Ltd.

Dhanagere

RBC

Chamarajanaga

r 2.00

Dhanagere RBC MHS at

Dhanagere Right Bank

canal of Kollegal Taluk in

Chamarajanagar District

DE 71 NCE 2002 dated

15/07/2002, EN 25 NCE 2006

dated 27/1/2006(36 months),

EN 434 NCE

2007/11/12/2007(23/11/2008

to 23/11/2011)

15-07-2002

22Sidhi Shree Shive Powers

Pvt. Ltd.Sankadagundi Udupi 1.20

Sankadagundi MHS,

50mts downstream of

sankundi stream, Shiru

Village, Baindur town,

Kundapur Taluk,

Sankundi

stream

DE 82 NCE 2002 dated

15/07/2002( V.I Shetty and

company-3 MW ) Change of

name vide GO EN 383 NCE 2006

dated 22/9/2006, EN 354 NCE

2006 dated 26/6/2006(Time

extension upto 26.06.2009), EN

383 NCE 2006 dated 8/5/2007

(Capacity reduction from 3 MW

to 1.20 MW)

15-07-2002

Page 11: Allotted to be Commissioned

23Soham Kilanjara

Renewable Energy Pvt. Ltd. Kilanjara

Dakshina

Kannada6.00

Kilanjara MHS across

Phalguni river at Kilanjar

Village of Mudabidre

Taluk of Dakshina

Kannada District

Gundihall

a/KelaHol

e/Gurupu

r

river/Hosa

ngadiHole

/Puchamo

garu

Hole/Phal

guni river

DE 240 NCE 2002 dated

10.10.2002. EN 148 NCE 2010

dated 19/06/2010(cancelled), EN

148 NCE 2010 dated

18/02/2011 (restoration, upto

31/03/2012) 10-10-2002

24Soham Kolavur Renewable

Energy Pvt. Ltd.Kolavur

Dakshina

Kannada18.00

Kolavur MHS across

Phalguni(Puchamogaru/

Gurupur) river, near

Kolavur Village of

Mudabidre Taluk in

Dakshina Kannada

District

Gundihall

a/KelaHol

e/Gurupu

r

river/Hosa

ngadiHole

/Puchamo

garu

Hole/Phal

guni river

DE 239 NCE 2002 dated

10/10/2002(6 MW, M/s

Phalguni Power Projects Pvt. Ltd.-

II ), DE 78 NCE 2003 dated

04/04/2003 (M/s Phalguni

Power Projects-II (A division of

Ground & Air Technical Services

(P) Ltd.),DE 289 NCE 2003 dated

07/01/2004(change of taluk &

district), EN 423 NCE 2006 dated

09/11/2006(3 years), EN 438

NCE 2006 dated 15/2/2007(9

MW), EN 176 NCE 2011 dated

04/08/2011 (Change of name to

M/s Soham Kolavur Renewable

Energy Pvt. Ltd. & 3 years TE

from 24/05/2010), EN 463 NCE

2011 dated 07.05.2012 (9 to 18

MW), EN 174 NCE 2013 dated

16.09.2013 (TE upto 23.05.2016)

10-10-2002

Page 12: Allotted to be Commissioned

25 SLV Power Pvt. Ltd. Aniyur Dakshina

Kannada24.00

Aniyooru MHS across

Aniyooru river at

Gundibagilu village of

Belthangadi Taluk in

Dakshina Kannada

District

Aniyooru

halla

DE 231 NCE 2002 dated

10/10/2002 (2 MW), EN 23 NCE

2004 dated 10/03/2004(3

MW),DE 246 NCE 2006 dated

27/06/2006(10 MW), EN 174

NCE 2010 dated

30//11/2010(upto 20/09/2012)

EN 19 NCE 2013 dated: 14-05-

2013( upto 20-09-2014) ,

Capacity Enhanced from 10 MW

to 24 MW vide GO.No.EN 189

NCE 2013 dt: 18.11.2013,Time

extended vide GO.No. EN 205

NCE 2014 dt: 02.12.2014 from

29.09.2014 to 2 years i.e upto

20.09.2016.

10-10-2002

26Venkata Satyanarayana

Power Pvt. Ltd.Hulavalli Chikkamagalore 7.50

Hulavalli MHS across

Bhadra river at Hulavalli

Village, Kalasa in

Chikkamagalore District

Bhadra

river

DE 322 NCE 2002 dated

27/01/2003(3.5 MW), EN 72

NCE 2006 dated 07/03/2006(36

months), EN 284 NCE 2009

dated 27/11/2009. (7.5 MW,

31/12/2010)

27-01-2003

Total 154.45

2003-2004

27 Aji Engineers Dabewadi Uttara kannada 12.00

Dabewadi MHS across

Pandhari river a

tributory to Kali river at

Dabewadi Village of Joida

Taluk in Uttara Kannada

District

Pandari

river

DE 238 NCE 2002 dated

10/04/2003( 2 MW), EN 93 NCE

2005 dated 18/04/2006 (12

MW), EN 28 NCE 2005 dated

03/03/2008 ( 1 Year), EN 70

NCE 2009 dated 12/6/2009(

31/03/2010), EN 70 NCE 2009

dated 23/02/2011(upto

31/12/2011)

10-04-2003

Page 13: Allotted to be Commissioned

28South West Hydro Power

Pvt. Ltd.Abilbiru Hassan 6.00

Abilbiru MHS across

Abilbiru Stream at

Marenahalli village of

Sakaleshpura Taluk in

Hassan District

Abilbiru

Stream

DE 148 NCE 2003 dated

18/11/2003( 4.5 MW) EN 148

NCE 2003dated 22/03/2004(6

MW) EN 63 NCE 2006 dated

02.02.2006 (time extended upto

01.02.2009)

18-11-2003

29Malleshwara Power Gen

Pvt. Ltd.Keri Hole Hassan 1.50

Across Keri Hole near

Keri Village, Sakaleshpur

Taluk,

Keri Hole

DE 245 NCE 2003 dated

19/01/2004, EN 196 NCE 2008

dated 17.09.2008 (Time extended

upto 16.09.2011), EN 47 NCE

2013 dated 07.08.2013 (Time

extension from 17.09.2011 to

16.09.2013)

19-01-2004

30South Canara Electric

Company Pvt. Ltd.Varahi Udupi 2.00

Varahi MHS across

Varahi river at Kunchikal

Falls, Mavinakana Village

of Kundapur Taluk in

Udupi district

Varahi

river

DE 244 NCE 2003 dated

10.02.2004

10-02-2004

31Manasa Sarovara Power

Pvt. Ltd.Harihara Davanagere 0.25

Harihara MHS across

Chainage No. 11.9

Harihar Branch Channel

of Bhadra Right Bank in

Bhadra

river

DE 61 NCE 2004 dated

13.2.2004( Venika Green Power

Pvt. Ltd,) , GO.No. EN 61 NCE

2004 dt: 22.3.2004, GO.No. EN 1

NCE 2007 dt: 14.02.2007,

GO.No. EN 257 NCE 2008 dt:

05.04.2011, GO.No. EN 12 NCE

2013 dt: 06.03.2012, Time

Extended vide GO.No.EN 115

NCE 2014 dt: 26.11.2014 from

11.02.2014 to 10.02.2016. Time

Extended vide Go.No. EN 317

NCE 2016 dt: 24.11.2016 from

11.02.2016 to 10.02.2018.

13-02-2004

Page 14: Allotted to be Commissioned

32 GSSMR Power Pvt. Ltd. Mchagundal Yadgir 1.30

Across Shorapur Branch

Channel, Machalgundal

Village, Shorapur Taluk,

DE 12 NCE 2004 dated

13.2.2004 (1.3 MW to GSSMR

Power Private Limited) EN 139

NCE 2007 dt: 01.06.2007 (upto

31.05.2010), EN 172 NCE 2011

dt: 23.04.2011 (upto

31.05.2011), EN 402 NCE 2011

dt: 28.02.2012 (upto 31.05.2013

and change of name to GSSMR

Energy Private Limited), EN 167

NCE 2013 dt: 09.07.2013 (upto

31.05.2015). Capacity enhanced

from 1.3 MW to 1.8 MW and time

extended from 01.06.2015 to

31.05.2017 vide GO.No. EN 11

NCE 2016 dt: 13.01.2016.

13-02-2004

33 Padmavathi Power Pvt. Ltd. Kattinakudige Chikkamagalore 9.00

Kattinakudige MHS

across Bhadra river at

Kattanakudige Village of

Mudigere Taluk in

Chikkamagalore District

Bhadra

river

DE 137 NCE 2003 dated

26/02/2004(2 MW), EN 87 NCE

2007dated 28/03/2007 924

months), EN 285 NCE 2009

dated 27/11/2009 (9 MW, upto

31/12/2010)

26-02-2004

34Rajarajeswari Power Pvt.

Ltd.Kagganala Chikkamagalore 12.00

Kagganala MHS across

Bhadra river near

Kagganala Village of

Mudigere Taluk in

Chikkamagalore district

Bhadra

river

DE 138 NCE 2003 dated

26/02/2004(2 MW), EN 52 NCE

2007 dated 07/03/2007( 3

years), EN 192 NCE 2008 dated

21/07/2008(12 MW)

26-02-2004

35Golflinks Software Park

Pvt. Ltd.Barapole Kodagu 5.50

Barapole MHS across

Barapole near Mukuta

Village of Virajpet Taluk

in Kodagu District

Barapole

Stream

DE 89 NCE 2004 dated

12.3.2004

12-03-2004

Page 15: Allotted to be Commissioned

36 Mrujaara Power Plant Agradalli Shimoga 0.75

Agradalli MHS across

Anveri Branch canal

(Matti halla) in

Shimoga District

DE 311 NCE 2002, dt:

30.04.2003 (0.25 Mw) DE 405

NCE 2004 Dated:10.12.2004

(0.25 MW to 0.5 Mw) DE 405

NCE 2004 dt: 17.02.2005 (

0.5 Mw to 1.5 MW), EN 127

NCE 2008, dt: 10.04.2008

time extended from 18.3.2008

to 17.09.2009., EN 528 NCE

2008, dt: 08.05.2009

cancelled, Restored vide

Go.No. EN 383 NCE 2009 dt:

19.11.2009.

17.02.2005

Total 50.30

2004-2005

37

SLS Green Power Private

Limited (formerly

Aishwarya Power Private

Limited)

Kandiya Chikkamagalore 10.00

Kandiya MHS utilizing

water flowing in Bhadra

river with about 2 Km

intake and about 2KM

Tail Race Canal at

Kandiya Village of

Chikamagalur Taluk &

District

Bhadra

river

DE 103 NCE 2004 dated

13/05/2004, EN 148 NCE 2007

dated 26/05/2007(3 years from

26/05/2007) , EN 193 NCE

2008 dated 21/07/2008( 10

MW), EN 137 NCE 2011 dated

10/11/2011.EN 455 NCE 2011

dated: 02-01-2012( name

transfered to M/s SLS Green)

13-05-2004

38Karnataka Renewable

Energy Development Ltd.Mysore 2.00 Hullahalli MHS

DE 97 NCE 2004 dated

17.5.2004 17-05-2004

Page 16: Allotted to be Commissioned

39Pavanaganga Power Pvt.

Ltd.Kolagave Chikkamagalore 4.00

Kolagave MHS across

Kolagave stream near

Girikhana Cofee Estate,

Fire Boundary,

Chikkamagalur Taluk,

Kolagave

Stream

DE 54 NCE 2004 dated

22/07/2004(3.5 MW) was

allotted in the name of M/s.

Geneva Power Limited), DE

54 NCE 2004 dt: 24.11.2004

(corrigendum) was issued, EN

188 NCE 2006 dt: 06.05.2006

Change of name to M/s.

Pavana Ganga Power Private

Limited, Capacity enhanced

from 3.5 MW to 4 MW vide

Go.No.EN 368 NCE 2006

dated 12/09/2006.

22-07-2004

40Khanapur Electric Co. Pvt.

Ltd.Belgaum 1.75

Across Malaprabha river

near Yadvagi Village,

Khanapur Taluk,

Malaprabh

a river

DE 53 NCE 2004 dated

9/9/2004 ( M/s Dipkit Limited-

1.5 MW), EN 191 NCE 2007

dated 21/06/2007(1.5 to 1.75

MW)

09-09-2004

41 Jasper Energy Pvt. Ltd. Saganur Gulbarga 16.00

across Dudganga river at

Karadga Village of

Jevargi Taluk Gulbarga

District.

Dudganag

a river

DE 156 NCE 2004 dated

09/09/2004(1 MW) & EN 404

NCE 2007 dated 3/12/2007 (16

MW)

09-09-2004

42 Saiteja Energies Pvt. Ltd. Yadgiri Yadgir 16.00

Across Bhima river at

Joldadgi Village, Yadgir

Taluk,

Bhima

river

DE 154 NCE 2004 dated

9.9.2004 & EN 403 NCE 2007

dated 3.12.2007.

09-09-2004

43 Sharan Power Pvt. Ltd. Yadgiri Yadgir 9.00Across Bhima river near

Yadgir Taluk,

Bhima

river

DE 293 NCE 2004 dated

9/9/2004(1 MW) & EN 298 NCE

2007, Dated 09/10/2007(6 MW)

& EN 375 NCE 2008, Dated

13/01/2009(9 MW).

09-09-2004

Page 17: Allotted to be Commissioned

44

Sahasralingeshwara Power

Pvt. Ltd.Nekkiladi

Dakshina

Kannada12.50

Nekkiladi MHS across

Kumaradhara river at

Nekkiladi village of

Puttur Taluk in

Dakshina Kannada

District

Kumaradh

ara river

DE 253 NCE 2004 dated

13/09/2004(1 MW), EN 279

NCE 2006 dated

21/07/2006(4.5 MW), Time

extended vide GO.No. EN 17

NCE 2013 dt: 19.02.2013

from 17.02.2013 to

16.02.2015.

13-09-2004

45SKN Hydro Energy Pvt.

Ltd.Bijapur 1.00

Distributory-11 of indi

branch canal of NLBC

near Village, Yatanur,

Sindagi Taluk,

DE 299 NCE 2004 dated

13.9.2004 & DE 118 NCE 2005,

Dated 27.04.2005 & EN 374

NCE 2008, Dated 12.01.2009.

13-09-2004

46 Deepak Cables (I) Pvt. Ltd. Maranahalli Hassan 14.10

Across Bhima river near

Revathgaon Village, Indi

Taluk, Bijapur District.

Bhima

river

DE 14 NCE 2004 dated

13/09/2004(10 MW) & EN 433

NCE 2007 dated

11/12/2007(14.1 MW).

13-09-2004

47 IJK Power Pvt. Ltd. Ganadahalli Mandya 15.00

Ganadahalli MHS across

Hemavathy river, near

Ganadahalli Village, KR

Pet Taluk,

Hemavathi

river

DE 252 NCE 2004 dated

13/09/2004(1 MW to M/s SMR

Power Pvt. Ltd.), EN 395 NCE

2009 dated 03/10/2009(15 MW

& change of company name to

M/s IJK Power Pvt. Ltd.)

Recomended to ED for time

extension

13-09-2004

48Biradar Hydro energy Pvt.

Ltd.Miyapur Raichur 0.98

Miyapur MHS, across

Distributory-16 of NRBC

near Miyapur Village,

Devadurga Taluk,

Krishna

river

DE 295 NCE 2004 dated

13/09/2004 (0.975 MW), EN 431

NCE 2007 dated 10/12/2007(3

Years)

13-09-2004

49Biradar Hydro energy Pvt.

Ltd.Wengalapur Raichur 0.95

Wengalapur MHS, across

Distributory-15 of NRBC

wengalapur Village,

Devadurga Taluk,

Krishna

river

DE 301 NCE 2004 dated

13/09/2004(0.95 MW), EN 432

NCE 2007 dated 10/12/2007(3

Years)

13-09-2004

50 Saiteja Energies Pvt. Ltd. Yadgir 1.00Across Bhima river at

Yadgir, Yadgir Taluk,

Bhima

river

DE 377 NCE 2004 dated

21.12.200421-12-2004

Page 18: Allotted to be Commissioned

51 Sarovar Energy Pvt. Ltd. Mandewal Gulbarga 1.75

Mandwal MHS, chainage,

Point Viz Km 3.5 to 5.5

and Km 13.0 to 14.75 on

Dy No. 12 of JBC near

Mandwal Village, in

Jewargi Taluk of

DE 382 NCE 2004 dated

21/12/2004 (Venika Green

Power Pvt. Ltd. )

21-12-2004

52 Shrishti Power Pvt. Ltd. Baipadi Dakshina

Kannada6.00

Baipadi MHS across

Belthangady hole a

tributory to Netravathi

near Baipadi Village,

Belthangady Taluk of

Dakshina Kannada

District.

Belthanga

di Stream

DE 439 NCE 2004 dated

5/01/2005(6 MW), EN 288 NCE

2007 dated 13/02/2008(upto

26/04/2011)05-01-2005

53 Mythree Power Developers Sampaji Mandya 0.25

Across right bank low

level canal from

Krishnaraja Sagar dam,

1 KM downstream of KRS

near Hongalli Village,

Srirangapatna Taluk,

Mandya District.

DE 6 NCE 2005 dated

22.3.2005(0,25 MW), EN 352

NCE 2011 dated

28/11/2011(upto 31/03/2012)22-03-2005

Total 112.28

2005-2006

54Oysters Power Projects Pvt.

Ltd.Kuduregundi Chikkamagalore 1.00

Kuduregundi MHS

across the existing weir

Kuduregundi Halla about

2 km from Kuduregundi

village of Koppa Taluk in

Chikkamagalore District.

Kuduregu

ndihalla

Stream

DE 329 NCE 2004 dated

21.4.2005 & DE 154 NCE

1994(3) dated 6.9.1994

21-04-2005

55Subhash Keerthihole

Power Company Ltd.Keerthi Hole Kodagu 21.00 Keerthi Hole SHP

Keerthihol

e Stream

DE 329 NCE 2004 dated

21.4.2005 & DE 154 NCE

1994(3) dated 6.9.1994

21-04-2005

56 Zeba Power Pvt. Ltd. Gopalpur Raichur 1.00

D/s of Narayanapur

Dam near Gopalpur

Village of Devadurga

Taluk in Raichur District

EME 58 NCE 2005 dated

25/04/2005

25-04-2005

Page 19: Allotted to be Commissioned

57 Zeba Power Pvt. Ltd. Masarkal Raichur 0.95

Masarkal MHS across

NRBC Distributory No.

16 branch distributory

No.1 near Masarkal

Village of Devadurga

Taluk in Raichur District

EME 63 NCE 2005 dated

25/04/2005

25-04-2005

58 A Prabhakar Reddy & Co. Raichur 5.00

Narayanapur Right Bank

Canal near rodalbanda,

Lingasugur Taluk,

raichur District.

Krishna

river

EN 363 NCE 2004 dated

08.06.2005

08-06-2005

59Kukke Hydro Projects Pvt.

Ltd.Kukke Stage-1

Dakshina

Kannada24.00

Kukke Stage-1 MHS

across river

Kumaradhara at between

Perabe-Kunthur village

and Charavaka village of

Puttur Taluk in

Dakshina Kannada

District

Kumaradh

ara river

DE 224 NCE 2005 dated

19/08/2005(12 MW to M/s Fiza

Developers & Inter Trade Pvt.

Ltd. ), EN 1 NCE 2008 dated

07/01/2008(12 MW to 22.75),

EN 1 NCE 2009 dated

25/03/2009(change of name to

M/s Kukke Hydro Projects Pvt.

Ltd.), EN 126 NCE 2011(1) dated

26/03/2011 (seperation of

G.O.s), EN 15 NCE 2015 dated

03.02.2015- Time extended for

further three years from the date

of G.O.

19-08-2005

Page 20: Allotted to be Commissioned

60Kukke Hydro Projects Pvt.

Ltd.Kukke Stage-2

Dakshina

Kannada10.25

Kukke Stage-2 MHS

across river

Kumaradhara between

Kodimbala village of

Puttur Taluk &

Edamangala village of

Sulya taluk in Dakshina

Kannada District

Kumaradh

ara river

DE 224 NCE 2005 dated

19/08/2005(12 MW to M/s Fiza

Developers & Inter Trade Pvt.

Ltd. ), EN 1 NCE 2008 dated

07/01/2008(12 MW to 22.75),

EN 1 NCE 2009 dated

25/03/2009(change of name to

M/s Kukke Hydro Projects Pvt.

Ltd.), EN 126 NCE 2011(2) dated

26/03/2011 (seperation of

G.O.s), Capacity enhanced from

10.25 MW to 12 MW and Time

extended for further three years

from the date of G.O.vide GO.No.

EN 19 NCE 2015, dt:

08.10.2015.

19-08-2005

61Kumaradhara Power Pvt.

Ltd. Kollya

Dakshina

Kannada24.00

Kollya MHS across

Kumaradhara, a

tributory to river

Nethravathi at

Kollya/Paranagaje Village

of Puttur Taluk in

Dakshina Kannada

District

Kumaradh

ara river

DE 168 NCE 2005 dated

23/08/2005(18 MW, M/s

Shree Shanakara narayan

Constructions), EN 194 NCE

2006 dated 26/05/2006

(change of name as M/s SNC

Power Corporation Pvt. Ltd.),

EN 184 NCE 2008 dated

01/07/2008 (change of name

to M/s Kumaradhara Power

Pvt. Ltd.), EN 102 NCE

2010dated 20/03/2010(18

MW to 24 MW), Time

extended for 3 years from the

date of GO vide GO.No. EN

201 NCE 2013 dt:

08.10.2015.

23-08-2005

Page 21: Allotted to be Commissioned

62SNS Power Projects Pvt.

Ltd.Chunchidoddi Ramanagara 10.00

Across Arkavati river

near chunchidoddi

Vilalge, Kanakapura

Taluk of Ramanagara

District. (formerly

Bangalore Rural District).

arkavati

river

DE 107 NCE 2004 dated

31.8.200531-08-2005

63Hallikeshwara Energy

Projects Pvt. Ltd.Mandya 0.50

Across Hebbahalla

stream near Belur village

in Mandya Taluk of

Hebbahall

a Stream

DE 211 NCE 2005 dated

31.8.200531-08-2005

64 Sirwal Hydel Powe Pvt. Ltd. Yadgir 0.95

Across the stream sirwal

a tributary to bhima,

Shirwal near Sirwal

Village in Shahapur

Taluk of

DE 216 NCE 2005 dated

14.9.2005

14-09-2005

65 Limbavali Power Pvt. Ltd. Doddahalla Chikkamagalore 18.00

Doddahalla MHS across

Doddahalla near Banjur

Village of Mudigere Taluk

in Chikkamagalore

District.

Doddahall

a Stream

DE 303 NCE 2005 dated

14/10/2005(18 MW)

14-10-2005

66 B Soilmec India Pvt. Ltd. Durgadalli Dakshina

Kannada3.00

Durgadalli MHS across

Durgadalli halla Stream

at Durgadalli village of

Dakshina Kannada

District.

Durgadalli

halla

Stream

DE 273 NCE 2005 dated

14/10/2005

14-10-2005

67Core Green Sugar & Fuels

Pvt. Ltd. Kodagu 4.00

Surlabi Hole a streamelt

of Madapur Hole which is

a tributory to

Harangi/River Cauvery,

Surlabi Village,

Somvarpet Taluk,

Kodagu District.

Surlabihol

e Stream

DE 276 NCE 2005 dated

14.10.2005.

14-10-2005

Page 22: Allotted to be Commissioned

68 Instrument & Systems Banasamudra Mandya 1.00

across Shimsha river

near Banasamudra

village in Mandya District

Shimsha

river

G.O. No. EN 301 NCE 2005

dated 14/10/2005, Capacity

enhanced from 1MW to 2 MW

vide GO.No. EN 13 NCE 2013

dt: 14.12.2015 & time

extended upto-------

14-10-2005

69 Mailarling Energy Ltd. Mavaling Uttara kannada 4.00

Across Kali river near

Mavaling village in joida

Taluk of Uttara Kannada

District.

Kali river

DE 181 NCE 2005 dated

14/10/200514-10-2005

70South Canara Electric

Company Pvt. Ltd. Shimoga 3.00

Across the Hulikal hole

stream, a streamlet to

river varahi near hulikal

village, Hosanagar taluk,

(Kunchikal and Varahi

MHS merged vide GO

No.EN 103 NCE 2006 dt

2.3.2006

Hulikalhol

e Stream

(Devar power has transferred its

4MW hulikalhole to Sothcanara

and enhanced to 9MW)

Enhancement from 6MW to

9MW (i.e.4+2=6+3=9) vide GO EN

103 NCE 2006 dt 2.3.200602-03-2006

Total 131.65

2006-2007

71 Gempro International Ltd. Asoga Belgaum 1.50

across Malaprabha river

at Asoga Village of

Khanapur Taluk in

Belgaum District.

Malaprabh

a river

DE 141 NCE 2006 dated

21/04/200621-04-2006

72Shakuntalam Power Pvt.

Ltd.Magundi Chikkamagalore 9.00

Magundi MHS across

Bhadra river 14 km from

Balehonnur town at

Balehonnur to Kalasha

road at Magundi Village

of Mudigere Taluk in

Chikkamagalore District

Bhadra

river

DE 138 NCE 2006 dated

21/04/2006(2 MW), EN 267 NCE

2007 dated 13/08/2007(9 MW)

21-04-2006

73 XS Hydro Energy Pvt. Ltd. Huvinahedaga

li Raichur 2.00

across Krishna near KK

Halli Village of

Devadurga taluk of

Raichur District.

Krishna

river

DE 54 NCE 2006 dated

21/04/200621-04-2006

Page 23: Allotted to be Commissioned

74Fortune Five Hydel

Projects Pvt. Ltd.Lakya Chikkamagalore 3.00

Lakya MHS across Lakya

hole near malleswara

Village near Mudigere

Taluk, Chikkamagalur

District.

Lakyahole

Stream

EN 342 NCE 2006 dated

16.10.2006

16-10-2006

75Sai Prasanna Power Pvt.

Ltd.

Upper

Charmadi

Dakshina

Kannada2.00

Upper Charmadi MHS

across charmadi river

near Charmadi Village,

Belthangadi Taluk,

Dakshina Kannada

district.

Charmadi

Stream

EN 322 NCE 2006 dated

16.10.2006 EN 43 NCE

2008/13/2/200816-10-2006

76 MK Power Pvt. Ltd. Charmadi Dakshina

Kannada2.00

Across charmadi river

near Charmadi Village,

Belthangadi Taluk,

Dakshina Kannada

district.

Charmadi

Stream

EN 324 NCE 2006 dated

16.10.2006 EN 261 NCE

2007/1/8/2007 16-10-2006

77R Sreeramulu Reddy and

Co.Shagalehalla Davanagere 2.50

Across Shagalehalla near

Bhanuvalli Village,

Harihara Taluk,

Shagalehal

la Stream

EN 321 NCE 2006 dated

16.10.2006 & EN 231 NCE

2007 dated 26.6.200716-10-2006

78 Prolight Systems Hassan 1.00

Kukanahall river at

Magjihally Village, in

Sakaleshpura Taluk, of

Hassan District.

kukanahal

la Stream

EN 232 NCE 2005 dated

16.10.200616-10-2006

79Venika Green Power Pvt.

Ltd.Chikka Mandya 24.75

Locate at Near Chikka

Makalli Village, Malavalli

Taluk,

DE 339 NCE 2006 dated

16.10.2006 & EN 154 NCE

2007 dated 15.5.200716-10-2006

80 XS Hydro Energy Pvt. Ltd.Nandikere

OdduMandya 24.75

Across Cauvery river

near Nandikere Oddu

Village, Malavalli Taluk,

Mandya District.

Cauvery

river

DE 338 NCE 2006 dated

16.10.2006 & EN 151 NCE

2007 dated 3.5.2007 16-10-2006

81 Atria Hydel Power Ltd.Sheshadri Iyer

IIMandya 12.00

Across Cauvery river

near Shivanasamudram,

Malavalli Taluk, Mandy

District.

Cauvery

river

EN 149 NCE 2006 dated

16.10.2006

16-10-2006

Page 24: Allotted to be Commissioned

82Jyoti Green Energy Pvt.

Ltd.Tallur Udupi 12.00

Tallur MHS across

Swarna river near Tallur

Village, Karkala Taluk,

Udupi District.

Swarna

river

EN 290 NCE 206 dated

16.10.2006 ( M/s TCI

Constructons) & EN 255 NCE

2007 dated 17/07/2007, EN 255

NCE 2007 dated

17/07/2007(12 MW)

16-10-2006

83 GVR Construction Pvt. Ltd. Kokkarni Udupi 3.00

Kokkarni MHS across

Sita river near Kokkarni

village of Karkala Taluk

in Udupi district.

Sita river

EN 294 NCE 2006 dated

16/10/2006( M/s GVR

Construction Pvt. Ltd., 3 MW) 16-10-2006

84Abletech Electro Engineers

Pvt. Ltd.Kelasi Uttara kannada 5.00

Kelasi MHS across

Bedthi hole at Kelasi

Village fo Yellapura Taluk

in Uttara Kannada

District

Bedthi/Ga

ngavalli

river

EN 53 NCE 2006 dated

16/10/2006

16-10-2006

85Kodekal Basaveswara

Power Generation Pvt. Ltd.Doni Yadgir 2.00

Across doni river near

Kodekal Village,

shorapur Taluk, gulbarga

District.

Doni river

EN 343 NCE 2006 dated

16.10.2006, Capacity enhanced

from 2 MW to 10 MW and Time

Extended fom 16.10.2011 to

31.03.2016 vide GO.No. EN 281

NCE 2012 dt: 11.02.2016.

16-10-2006

86 RSR Power Pvt. Ltd. Karmbar Dakshina

Kannada2.00

Karmbar MHS across

Phalguni river at

karmbar Village of

Belthangadi Taluk in

Udupi District

Gundihall

a/KelaHol

e/Gurupu

r

river/Hosa

ngadiHole

/Puchamo

garu

Hole/Phal

guni river

EN 278 NCE 2007 dt 20/1/2010

27-01-2007

Page 25: Allotted to be Commissioned

87Frontier offshore Drilling

(India) Pvt. Ltd.

Sangam Stage-

2 Ramanagara 15.00

Sangam Stage-2 Across

Cauvery river near

Sangam Village,

Channapatana Taluk,

(formerly Bangalore rural

District)

Cauvery

river

EN 416 NCE 2006 dated

08/03/2007 & EN 539 NCE

2008 dated

30/01/2009(company name

changed from M/s Frontier Off

shore Drilling India Pvt. Ltd. to

M/s. West Mountain Power Ltd.)

08-03-2007

88Frontier offshore Drilling

(India) Pvt. Ltd.

Sangam Stage-

3 Ramanagara 22.00

Sangam-3 across

Cauvery river near

Sangam Village,

Channapatana Taluk,

(formerly Bangalore rural

District)

Cauvery

river

EN 414 NCE 2006 dated

08/03/2007, EN 537 NCE 2008

dated 12/06/2008 (from M/s.

West Mountain power Ltd. to

M/s. Frontier offshore Drilling

India Pvt. Ltd.)

08-03-2007

89Frontier offshore Drilling

(India) Pvt. Ltd.

Sangam Stage-

1Ramanagara 18.00

Sangam Stage-1 Across

Cauvery river near

Sangam Village,

Channapatana Taluk,

(formerly Bangalore rural

District)

Cauvery

river

EN 447 NCE 2006 dated

08.3.2007

08-03-2007

90

Bhoruka Power

Corporation Ltd. Chempuradod

di

Chamarajanaga

r 6.00

Chempuradoddi MHS

across Cauvery river at

Chempuradoddi Village

of Kollegala Taluk in

Chamarajanagar District

Cauvery

river

EN 509 NCE 2006 dated

08/03/2007

08-03-2007

91 GVP Infra Projects Pvt. Ltd. Durgahole Udupi 10.00

Durgahole MHS across

Durgahole ner Durga

Village, Karkala Taluk

Udupi district.

Durgahole

Stream

EN 439 NCE 2006 dated

13/03/2007(4 MW), EN 439 NCE

2006 dated

01/06/2007(K.Gangaprasad

company to GVP Infra projects

Pvt. Ltd.), EN 254 NCE 2007

dted 17/07/2007(10 MW)

13-03-2007

92Vijaya Green Power Pvt.

Ltd.

Chamarajanaga

r 24.75

Across

Souparnika/Kollur river

near Janmane Village,

Kundapur Taluk, udupi

District.

Souparnik

a/Kollur

river

EN 52 NCE 2006 dated

17.3.2007 EN

224 NCE 2008 dated 22.8.2008

17-03-2007

Page 26: Allotted to be Commissioned

93 Modern Rice MillChamarajanaga

r 2.00

Across Cauvery river

near Budikatte Village,

Kollegala Taluk,

chamarajanagar District.

Cauvery

river

EN 502 NCE 2006 dated 17-03-

2007

17-03-2007

94Maruthi Power Gen (India)

Pvt. Ltd.Bettakumari Hassan 13.00

Bettakumari MHS across

Bettakumari stream a

tributory to

Kumaradhara near

Jadahatti/Vadahalli

Village of Sakaleshpur

Tlauk in Hassan District.

Bettakum

ari Stream

EN 393 NCE 2006 dated

17/03/2007(4 MW), EN 440 NCE

2007 dated 15/12/2007 (13 MW)

17-03-2007

95Maruthi Power Gen (India)

Pvt. Ltd.Hongadalla Hassan 24.00

Hongadalla MHS across

Hongadahalla stream a

tributory to Kemphole

near Yedakumari Village

of Sakalehspura Taluk in

Hassan District

Hongadall

a Stream

EN 392 NCE 2006 dated

17/03/2007 (5 MW) & EN 299

NCE 2007 dated

04/09/2007(18.9 MW), EN 355

NCE 2010 dated 19/10/2010( 24

MW)

17-03-2007

96 SM Power Projects Pvt. Ltd. Mandya 10.00

Across Cauvery River d/s

of Ganganachukki falls,

Near Sivansamudar

Village Malavalli

Tal,Manday Dist

Cauvery

river

EN 511 NCE 2006 dated

17.3.2007

17-03-2007

97 SLS Power Industries Ltd. Belakavadi Mandya 1.50

Belakavadi MHS across

Cauvery river near

Sattegala Village,

Malavalli Taluk, Mandya

Dsitrict.

Cauvery

river

EN 504 NCE 2006 dated

17/03/2007(1.5 MW)

17-03-2007

98North East Power Projects

Pvt. Ltd.Dadla Raichur 3.00

Dadla MHS across

Thungabhadra river near

Dadla village, Manvi

Taluk, Raichur District

Thungabh

adra river

EN 507 NCE 2006 dated

17/03/2007

17-03-2007

Page 27: Allotted to be Commissioned

99Sidhi Shree Shive Powers

Pvt. Ltd.Kollur Udupi 2.00

Across

Souparnika/Kollur river

near Janmane Village,

Kundapur Taluk, udupi

District.

Souparnik

a/Kollur

river

EN 452 NCE 2006 dated

17/03/2007

17-03-2007

100 Pinakin Energy Pvt. Ltd. Shirurmutt Udupi 2.00

Shirurmutt MHS across

Swarna river near

Shirurmutt Village of

Udupi Taluk in Udupi

District.

Swarna

river

EN 505 NCE 2006 dated

17/03/2007 (2 MW), EN 455

NCE 2010 dated

21/01/2011(tranfer to M/s

Pinakin Energy Pvt. Ltd. & T.E.

upto 22/06/2012)

17-03-2007

101North East Power Projects

Pvt. Ltd.Gaddimadi Koppala 3.00

Gaddimadi MHS across

Thungabhadra river at

Gaddimadi Village of

Gangavathi Taluk in

Koppal District

Thungabh

adra river

EN 508 NCE 2006 dated

17/03/2007

17-03-2007

Total 264.75

2007-2008

102 Tarini International Kanayatana Ramanagara 7.00

Kanayatana MHS across

Arkavati river near

Sangam, Bangalore

District.

Arkavathi

river

EN 215 NCE 2007 dated

23.06.200723.6.2007

103 B Soilmec India Pvt. Ltd.Someshwara

Stage II Mandya 15.00

Someswara Stage-II MHS

across Kaveri river near

Shivanasamudram,

Mandya District.

Cauvery

river

EN 223 NCE 2007 dated

23/06/2007

23-06-2007

104 B Soilmec India Pvt. Ltd.Hasurubore

Halla Mandya 20.00

Hasurubore halla MHS

across Kaveri river near

Shivanasamudram in

Mandya District

Cauvery

river

EN 217 NCE 2007 dated

23/06/2007

23-06-2007

105 West Mountain Power Ltd.

Shimsha

Kaveri

Confluence

SHP

Mandya 24.00

across Kaveri river near

Chikka Village in

Mandya District

Allotted vide G.O. No. EN 224

NCE 2007 dated 23/06/200723-06-2007

Page 28: Allotted to be Commissioned

106R Sreeramulu Reddy and

Co.Kukkawada Davanagere 2.00

Kukkawada MHS across

Shagalehalla near

Kukkavada Village,

Davanagere Taluk,

Shagalehal

la Stream

EN 325 NCE 2006 dated

16.10.2006 & EME 230 NCE

2007 dated 26.6.2007 26-06-2007

107 Parvathavardini Pvt. Ltd. Tanikode Chikkamagalore 3.00

Tanikode MHS across

Tunga river near

Tanikode Village,

Srungeri Taluk,

Chikmagalur District.

Thunga

river

EN 109 NCE 2007 dated

05/10/2007

05-10-2007

108Vara Siddi Vinayaka

Energy Pvt. Ltd.Kittur -I Belgaum 3.00

Kittur -I MHS across

Markandeya river at

Kempatti Village of

Gokak Taluk in Belgaum

District

markande

ya river

EN 218 NCE 2007 dted

5/10/2007

05-10-2007

109Maruthi Power Gen (India)

Pvt. Ltd.Yedakumari Hassan 24.00

across Malaprabha river

near Jamboti at

Kusumalli Village of

Khanapur Taluk

Belgaum District

Malaprabh

a river

EN 277 NCE 2007 dated

5/10/2007(4 MW) & EN 277

NCE 2007 dated 29/11/2007(19

MW), EN 354 NCE 2010 dated

17/02/2011(24 MW)

05-10-2007

110Dishaa Power Corporation

Ltd.Peradur Udupi 4.00

Across Madisal Hole near

Peradur Village,

Madisal

Hole

EN 203 NCE 2007 dated

5.10.200705-10-2007

Total 102.00

2008-2009

111Varunodaya Power Pvt.

Ltd.Kalasa Chikkamagalore 1.50

Across Karle Hole near

Kalasa Village, in

Mudigere Taluk,

chikkamagalur District.

karle

Stream

EN 441 NCE 2006, Dated

10/12/2008(1.5 MW)10-12-2008

112Mahadeshwara Power Pvt.

Ltd.Gandhinagar

Chamarajanaga

r 5.00

Across Cauvery River

near Gandhi

Nagar/Tellanur Village,

in Kolegal Taluk,

Chamarajnagar District.

Cauvery

river

EN 62 NCE 2009, Dated

17/02/2009 (5 MW), Capacity

enhanced & time extended vide

Go.No. EN 84 NCE 2015 dt:

04.05.2015. (24.75 MW)

17-02-2009

Page 29: Allotted to be Commissioned

113Mahadeshwara Power Pvt.

Ltd.Devarahalli

Chamarajanaga

r 5.00

Across Cauvery River

near

Arabigere/Devarhalli

Village, in Kolegal Taluk,

Chamarajnagar District.

Cauvery

river

EN 32 NCE 2009, Dated

17/02/200917-02-2009

Total 11.50

2009-2010

114 Mysore Mercantile co. Ltd. Varahi Udupi 8.00

Varahi MHS across

Varahi river near

Hosagadde Village of

Kundapur Taluk in

Udupi District

Varahi

river

EN 302 NCE 2007 dated

19/05/2009(4 MW), EN 10 NCE

2011 dated 18/01/2011 (8 MW)

19-05-2009

115Shravana Raj Power

Projects Pvt. Ltd.

Andrahalla

&Yennehole Udupi 2.00

Andrahalla & Yennehole

MHS across Yennehole at

Yennehole Village of

Karkala Taluk in Udupi

District

Yenne

Hole/Swar

na Nadi

EN 338 NCE 2007 dated

19/05/2009(2 MW)19-05-2009

116Chamundeshwari Energy

Pvt. Ltd.Ajri Udupi 3.00

Ajri MHS across Kubja

river at Ajri Village of

Kundapur Taluk in

Udupi district

Kubja

river

EN 50 NCE 2008 dated

19/05/2009 (3 MW)19-05-2009

117Chamundeshwari Energy

Pvt. Ltd.

Chikkotanaha

di Udupi 3.00

Chikkothanahadi MHS

across Kubja river near

Chikkotanahadi Village

of Kundapur Taluk in

Udupi district.

Kubja

river

EN 44 NCE 2008 dated

19/05/2009 (3 MW)19-05-2009

118Chamundeshwari Energy

Pvt. Ltd.

Chikkotanaha

di Udupi 3.00

across Chakra river near

Hallihole Village of

Kundapur Taluk in

Udupi District

Chakra

river

EN 46 NCE 2008 dated

19/05/2009 (3 MW)19-05-2009

119Chamundeshwari Energy

Pvt. Ltd.Mudugal Udupi 3.00

Mudugal MHS across

Chakra river near

Hanchinakatte Village of

Kundapur Taluk in

Udupi district

Chakra

river

EN 47 NCE 2008 dated

20/05/2009 (3 MW)19-05-2009

Page 30: Allotted to be Commissioned

120Shravana Raj Power

Projects Pvt. Ltd.

Yellur &

Kellur

Dakshina

Kannada2.00

Yellur & Kellur MHS

across Yellur & Kellur

river near Bidarabettu

Village, Belthangadi

Taluk in Dakshina

Kannada District

Yellur &

Kellur

Stream

EN 339 NCE 2007 dated

19.5.2009, Corrigendum towards

Geographical location EN 339

NCE 2007 dt: 22.09.2009

19-05-2009

121Dishaa Power Corporation

Ltd.Jamboti Belgaum 9.00

across Malaprabha river

near Jamboti at

Kusumalli Village of

Khanapur Taluk

Belgaum District

Malaprabh

a river

EN 308 NCE 2007 dated

19/05/2009, Corrigendum for

Geographical location EN308

NCE 2007 dt: 05/10/2009

19-05-2009

122Vara Siddi Vinayaka

Energy Pvt. Ltd.

Malaprabha

LBC Belgaum 2.50

Malaprabha LBC MHS

across Malaprabha Left

Bank Canal at Kalloli

Village of Belgaum Taluk

in Belgaum District.

Malaprabh

a river

EN 220 NCE 2007 dated

19/05/2009 & 30/12/2009,

Time extended from 19.5.2014 to

18.5.2017 vide GO.No. EN 137

NCE 2104, dt: 23.2.2016.

19-05-2009

123Dishaa Power Corporation

Ltd.Balya

Dakshina

Kannada1.00

Singanapura MHSacross

Ghatprabha River at

Singanapur village of

Gokak Taluk in Belgaum

Dist.

Ghataprab

ha river

EN 192 NCE 2007 dated

19.5.2009, Corrigendum for

Geographical location EN 192

NCE 2007 dt: 17/08/2009

19-05-2009

124Dishaa Power Corporation

Ltd.

Amruth

Narayana Ramanagara 6.00

Amruth Narayana MHS

across Vrushabhavathi

river at Tippur Village of

Ramanagar Taluk in

Ramanagara district

Vrushabh

avathi

EN 48 NCE 2008 dated

19.5.2009,Corrigendum for

Geographical location EN 48 NCE

2008 dt: 17/08/2009

19-05-2009

125Dishaa Power Corporation

Ltd.Gaddehalli Uttara kannada 7.00

Across Sonda halla

which is a tributary of

Bedthi river near

Gaddehalli village,

Ankola Taluk, Uttara

Kannada Dist

Sonda

stream

EN 365 NCE 2007 dated

19/05/2009,Corrigendum for

Geographical location EN 365

NCE 2007 dt: 17/08/2009

19-05-2009

126

MVK Green Power Pvt Ltd,

(Formerly Corporate Hydro

Energy Pvt. Ltd).

Castelrock Uttara kannada 4.00

Castelrock MHS across

Doodh Sagar Stream at

Castelrock village of

Joida Taluk in Uttara

Kannada District

Doodh

Sagar

Stream

EN 382 NCE 2007 dated

1/06/2009(4 MW), Transfer of

capacity from Corporate to MVK

vide GO.No. 181 NCE 2011 dt:

06.04.2011

01-06-2009

Page 31: Allotted to be Commissioned

127Sagar Power (Neerukatte)

Pvt. Ltd.Balnaduhole

Dakshina

Kannada3.00

Balnaduhole MHS across

Balnadu Hole at

Chandadka village of

Sulya Taluk in Dakshina

Kannada District

Balnaduh

ole

EN 45 NCE 2008 dated

04/06/200904-06-2009

128Renovo Power Gen Pvt.

Ltd. Kalaseshwara Chikkamagalore 2.00

Kalaseshwara MHS

across Bhadra river near

Kalasa town in

Chikkamagalur District

Bhadra

river

EN 331 NCE 2007 dated

25/06/2009(2 MW),

Corrigendum for Geographincal

coordinates EN 331 NCE 2007

dt: 25/05/2010

25-06-2009

129 LK Power Corporation Ltd.Devara

Belakere Davanagere 2.00

Devara Belakere MHS

across Shantisagar

Barrage Lakkavalli Dam

at Devara Belekere

Village of Harihara Taluk

in Davanagere District

GO.No. PWD 148 PPC 89(2)

dated : 14.03.1990, Cancelled

vide GO.No. EN 205 NCE 2002

dt: 28.05.2004, Restored vide Go

No.EN 379 NCE 2009 dated

25/06/2009, Time Extended vide

GO.No. EN 168 NCE 2014 dt:

21.11.2014 from 25.06.2010 to

31.12.2015.

25-06-2009

130 Sai Leela Power Pvt. Ltd. Gundiadka Dakshina

Kannada5.00

Gundiadka MHS across

Payaswini river (6.5 Km

from Sulya to West) of

Sulya Taluk in Dakshina

Kannad District

Payaswini

river

EN 376 NCE 2007 dated

30/06/2009 (2 MW), EN 376

NCE 2007 dated 10/08/2010

(Corrigendum:Lat & Long), EN 08

NCE 2011 dated 04/02/2011 (5

MW)

30-06-2009

131North East Power Projects

Pvt. Ltd.Panaja

Dakshina

Kannada5.00

Panaja MHS across

Kumaradhara river at

Panaja Village of Puttur

Taluk in Dakshina

Kannada District

Kumaradh

ara river

EN 26 NCE 2008 dated

03/07/2009 (5 MW), EN 26 NCE

2008 dated

10/01/2011(Corigendum- lat &

long)

03-07-2009

132Panchajanya Power

Projects Pvt. Ltd.Singanapura Belgaum 3.00

Singanapura MHSacross

Ghatprabha River at

Singanapur village of

Gokak Taluk in Belgaum

Dist.

Ghataprab

ha river

EN 53 NCE 2008 dated

16/07/2009 & 22/09/200916-07-2009

Page 32: Allotted to be Commissioned

133 Blue Pal Power Pvt. Ltd. Kotebhavi Uttara kannada 6.40

Kotebhavi MHS across

Kandanihalla at

Kotebhavi Village of

Ankola Taluk in Uttara

Kannada District

Kandaniha

lla Stream

EN 25 NCE 2008 dated

16/07/2009(4 MW) &

22/09/2009(Corrogendum-Lat &

Long), EN 11 NCE 2011 dated

04/02/2011(6.4 MW)

16-07-2009

134Sagar Power (Dandela) Pvt.

Ltd.Kanchimane Uttara kannada 4.00

Kanchimane MHS across

Bedthi Mogaddehalla

River at Ramnagara

Village of Yallapur Taluk

in Uttara Kannada

District.

Bedthi/Ga

ngavalli

river

EN 21 NCE 2008 dated

05/08/2009 (4 MW to M/s Sagar

Power (Dandela) Pvt. Ltd.)

05-08-2009

135Trident Power Systems Ltd.

Kannadagal Uttara kannada 10.00

Kannadagal MHS across

Kali River Kannadagal

Naala Stream near

Kannigeri Village of

Yallapur Taluk in

Uttara Kannada District.

Kali riverEN 63 NCE 2008 dated

05/08/2009 (10 MW)05-08-2009

136Mimesis Hydel Projects (P)

Ltd.Huigere Chikkamagalore 2.00

Huigere MHS across

Bhadra river at Huigere

Village of

NarasimharajaPura

Taluk in Chikkamagalore

District

Bhadra

river

EN 330 NCE 2007 dated

16/09/2009(M/s Prolight

systems,2 MW), EN 350 NCE

2010 dated 31/08/2010(change

of company name to M/s

Mimesis Hydel Projects Pvt. ltd.)

16-09-2009

137Mimesis Hydel Projects (P)

Ltd.Harakodige Chikkamagalore 2.00

Harakodige MHS across

Bhadra river at

Harakodige Village of

NarasimharajaPura

Taluk in Chikkamagalore

District

Bhadra

river

EN 324 NCE 2007 dated

16/09/2009 (M/s Prolight

systems,2 MW), EN 350 NCE

2010 dated 31/08/2010(change

of company name to M/s

Mimesis Hydel Projects Pvt. ltd.)

16-09-2009

Page 33: Allotted to be Commissioned

138Achit Infrastructure Pvt.

Ltd.Kottigehara Chikkamagalore 3.00

Kottigehara MHS across

right bank of the river

Aniyur halla at

Kotigehara village of

Mudigere Taluk in

Chikkamagalur District

Aniyooru

Halla

EN 395 NCE 2007 dated

16/09/2009(3 MW)16-09-2009

139

Aparimita power ventures

pvt ltd (Formerly

Aishwarya Power Pvt. Ltd. )

Kumbenahalli Hassan 4.00

Kumbenahalli MHS

across Hemavathi river

at Kumbenahalli village

of Channarayapattana

Taluk in Hassan District

Hemavathi

river

EN 337 NCE 2007 dated

03/10/2009 (1.5 MW), Capacity

transfer from Aishwarya power

pvt ltd to Aparimita power

ventures pvt ltd vide GO.No. EN

226 NCE 2012 dt: 14.08.2012

and Capacity enhanced from 1.5

MW to 4 MW vide GO.No. EN 334

NCE 2012 dt: 29.12.2012.

03-10-2009

140Dhanalakshimi Power Pvt.

Ltd. Konki Uttara kannada 2.00

Konki MHS across Bedti

river at Konki Village of

Ankola Taluk in Uttara

Kannada District

Bedthi/Ga

ngavalli

river

EN 49 NCE 2008 dated

03/10/2009 (2 MW)03-10-2009

141 Padmavathi Power Pvt. Ltd. Vaddihalla Uttara kannada 2.00

Vaddihalla MHS across

Vaddihalla at dabbesar,

Sathoddi and barballi

village of Yellapura taluk

in Uttara kannada

District

Vaddihalla

Stream

EN 374 NCE 2007 dated

03/10/200903-10-2009

142Nimishamba Energy India

Pvt. Ltd.Bangaradoddi Mandya 3.00

Across Bangaradoddi

Canal Which takes off

water from Cauvery river,

Palahally village,

Srirangapatna Taluk,

Mandya District.

Cauvery

river

EE 45 NCE 2005 dated 22-03-

2005 (0.3MW) EN 460 NCE

2009 dated 16-10-2009 (3MW)

16-10-2009

Page 34: Allotted to be Commissioned

143 SD Nageshwar Doddahalla Chikkamagalore 4.00

Doddahalla MHS across

Dodda Halla Stream at

Somanakadu village of

Mudigere Taluk in

Chikkamagalore District

Doddahall

a Stream

EN 493 NCE 2009 dated

25/11/2009 (4 MW)25-11-2009

144Manasa Gangothri Power

Pvt. Ltd.

Baburayanako

ppaluMandya 3.00

across LOKAPAVANI

river, near

BABURAYANAKOPPALU

village, SRI

RANGAPATNA Taluk of

MANDYA District

Lokapavan

i river

EN 236 NCE 2009, dated 25-11-

2009., Time extended vide

GO.No. EN 134 NCE 2013 dt:

06.09.2013 upto 24.11.2014

25-11-2009

145 B&S Energy Pvt. Ltd. Lokapavani Mandya 2.00

Across Lokapavani river,

near Pattasomanahalli

Village, Pandavapura

Taluk, Mandya District.

Lokapavan

i river

EN 228 NCE 2009, dated 25-11-

2009., Corrigendum for

implementation of the project for

5 years vide GO.No EN 92 NCE

2014 dt: 19.04.2014.

25-11-2009

146Sree Nandi Basaveshwara

Power Gen. Co.Bhadra RBC Shimoga 0.18

Bhadra R.B.C. MHS

across 22nd

Distributory @ 2nd & 3rd

KM Bhadra RBC at

Yadehalli Village of

Bhadravathi Taluk in

Shimoga District.

Bhadra

river

EN 292 NCE 2009 dated

25/11/2009, Time extended vide

GO.No. EN 26 NCE 2015, dt :

11.02.2016 upto 11.02.2016

25-11-2009

147 CGP Hydro Power Pvt. Ltd. Mallar Udupi 2.00

Mallar MHS across

Mallar Hole a tributory to

Yenne Hole/Swarna Nadi

at Mallar Village of

Karkala Taluk in Udupi

District

Yenne

Hole/Swar

na Nadi

EN 159 NCE 2009 dated

26/11/2009 (2 MW)26-11-2009

148NVS Power Projects (I) Pvt.

Ltd.Kampli Bellary 2.00

across Thungabhadra

canal Ramsagar village of

Hospete taluk in Bellary

District

Thungabh

adra river

EN 273 NCE 2009 dated 26-11-

200926-11-2009

Page 35: Allotted to be Commissioned

149Namana Hydro Power Pvt.

Ltd.Aradalu Chikkamagalore 4.00

Aradalu MHS across

Sitanadi at Aradalu

Village of Koppa taluk in

Chikkamagalore District

Sita river

EN 122 NCE 2009 dt

26/11/2009( 2 MW), EN 09 NCE

2011 dated 05/02/2011 (4 MW)

26-11-2009

150NVS Power Projects (I) Pvt.

Ltd.Hulukumale Chikkamagalore 3.00

Hulukumale MHS across

Hulukumale stream,

Guttihalli village in

Mudigere Taluk of

Chikkamagalur District

Hulukuma

le Stream

EN 103 NCE 2009 dated

26/11/200926-11-2009

151 Sealwel Power Corporation Madhugundi Chikkamagalore 1.00

Durgadalla MHS

across Durgadalla

Stream at

Madhugundi Village of

Mudigere Taluk in

Chikkamagalore

District

EN 130 NCE 2009 dated

26/11/2009 (1 MW)26-11-2009

152 PGC Hydro Power Pvt Ltd Ambindagundi Udupi 4.00

Ambindagundi MHS

across Ambindagundi

Hole at Manjalthar

Village of Karkala Taluk

in Udupi District

Ambindag

undi Hole

EN 181 NCE 2009 dated

04/12/2009 (2 MW),

Corrigendum for name change to

PGC Hydro Power Pvt Ltd vide

GO.No. EN 181 NCE 2009 dt:

27.07.2010.

04-12-2009

153 Sai Leela Power Pvt. Ltd. Machadka Dakshina

Kannada5.00

Machadka MHS across

Payaswini river at

Machadka Village of

Sulya Taluk in Dakshina

Kannada District

Payaswini

river

EN 326 NCE 2007 Dated

15/12/2009 (2 MW), EN 12 NCE

2011 dated 07/02/2011(5 MW)

15-12-2009

154 Sriven Power Pvt. Ltd. Heggadahalli Mandya 5.00

Across Lokapavani river

at Heggadahalli Village of

Pandavapura Taluk in

Mandya District

Lokapavan

i river

EN 490 NCE 2009, dated 15-12-

200915-12-2009

Page 36: Allotted to be Commissioned

155 Vikranth Energy Pvt. Ltd. Kotekoppa Shimoga 2.00

Kotekoppa MHS across

Kotekoppa,

Mavinaagundi &

Nagahalli streams,

Kotekoppa village of

Sagara Taluk in Shimoga

Distrct

kotekoppa

Stream

EN 306 NCE 2007 dated

15/12/200915-12-2009

156 Hotel Maruthi Pvt. Ltd. Yettinahole Hassan 4.00

Yettinahole MHS across

Yettinahole stream at

alavalli village of

Sakleshpur taluk in

Hassan District

Yettinahol

e/Kempuh

ole/Gundi

ahole

EN 237 NCE 2008 dated

18/12/2009 (4 MW)18-12-2009

157Sidhi Shree Shive Powers

Pvt. Ltd.Shambhavi

Dakshina

Kannada2.00

Shambhavi MHS across

Mulki river at

Kanchivayal at Puttige

Village of Mangalore

Taluk in Dakshina

Kannada District

Sanuru

Hole/ Bola

Hole/

Mulkiriver

EN 135 NCE 2007 dated

19/12/2009(2 MW), EN 127 NCE

20011 dated

08/03/2011(Corrigendum- lat &

long)

19-12-2009

158 Zen Power Pvt. LtdPaschim

vahini Mandya 2.00

Paschim vahini MHS,

Across Paschim vahini

village, Swasthya

ayurvedha village,

Srirangapattana taluk

Cauvery

EN 261 NCE 2009 dt 5/1/2010

(.5 MW), EN 306 NCE 2011 dt:

29.07.2011 (0.5 Mw to 2 MW),

05.01.2010

159Sagar Power (Neerukatte)

Pvt. Ltd.Pattadalla Uttara kannada 2.00

across Pattadalla at

Narskal Villlage of Sirsi

Taluk in Uttara kannada

District

pattadalla

StreamEN 304 NCE 2007 dt 29.12.2009 29.12.2009

160 Rama EnterprisesDoddrasinake

re Mandya 0.50

Doddrasinakere MHS,

Across Sulekere canal,

Doddarasinakere village,

Maddur taluk

Cauvery EN 231 NCE 2009 Dt 8/1/2010 08-01-2010

161Nisarga Hydro Power (P)

LtdKoovehalla Chikkamagalore 4.00

Koovehalla MHS across

Kuvehalla at Kuve village

of Mudgere taluk in

Chikkamagalore district

Koovehalla

Stream

EN 266 NCE 2009 dt

15/01/2010 (4 MW)15-01-2010

Page 37: Allotted to be Commissioned

162Subhash Kabini Power

Corporation Pvt. Ltd.Bhadra RBC Davanagere 3.00

Bhadra RBC MHS,

Across Bhadra RBC

near, Heremalali village,

Cennagiri taluk

Bhadra

riverEN 223 NCE 2009 dt 16/1/2010 16-01-2010

163Subhash Kabini Power

Corporation Pvt. Ltd.Hulikere Mandya 3.00

Hulikere MHS, across

Vishweshwaraiah canal,

Hulikere koppalu village,

pandavapura taluk,

EN 253 NCE 2009 dt 16/1/2010 16-01-2010

164 B&G Energy Pvt. Ltd. Sangapuram Koppala 2.40

Sangapuram MHS across

Thungabhadra river at

Sangapuram Village of

Gangavati taluk in

Koppala District

Thungabh

adra river

EN 235 NCE 2009 dated

19/01/201019-01-2010

165 B&G Energy Pvt. Ltd.

Virupakshewa

ra swamy

MHS

Koppala 4.20

Virupakshewara swamy

MHS across

Thungabhadra river at

Pambapati Swami gudi

Village of Gangavati

taluk in Koppala District

Thungabh

adra river

EN 232 NCE 2009 dated

19/01/201019-01-2010

166 B&G Energy Pvt. Ltd. Yippervare Koppala 3.60

Yippervare MHS across

Thungabhadra river (on

left bank) at Yippervare

Village of Gangavati

taluk in Koppala District

Thungabh

adra river

EN 229 NCE 2009 dated

19/01/201019-01-2010

167 B&G Energy Pvt. Ltd. Chintamani Koppala 3.60

Chintamani MHS across

Thungabhadra river at

Anegundi Village of

Gangavati taluk in

Koppala District

Thungabh

adra river

EN 237 NCE 2009 dated

19/01/201019-01-2010

168Chamundeshwari Energy

Pvt. Ltd.Gulavadi Udupi 3.20

across Chakra &

KubjaVillage of

Kundapur Taluk in

Udupi district.

Chakra

riverEN 160 NCE 2009 dt 19/1/2010 19-01-2010

Page 38: Allotted to be Commissioned

169Sai Rutwika Power Projects

Pvt. Ltd.Sulekote Mysore 2.00

Sulekote MHS across

Cauvery River at

Sulekote Village of

Periyapattana taluk in

Mysore District

Cauvery

river

EN 235 NCE 2008 dated

20/01/2010 (2 MW)20-01-2010

170 RSR Power Pvt. Ltd. Machittehole Udupi 2.00

Machittehole MHS

Across Machitte hole at

Kadari village of Karkala

Taluk in Udupi District

Machitte

HoleEN 286 NCE 2007 dt 20/1/2010 20-01-2010

171Banashankari Hydro Power

PlantIdikani Chikkamagalore 2.00

Idikani MHS, across,

Hemakki halla, (tributary

to Bhadra) at Idikani

Village, Kalsa hobli of

Mudigere Taluk in

Chikkamagalore District

Hemmakki

hallaEN 124 NCE 2009 dt 21/1/2010 21-01-2010

172 Vriddhi Powers Arsinagundi Udupi 2.00

Arsinagundi MHS across

Souparnika hole at

Arsinagundi Village of

Kundapura Taluk in

Udupi District

Souparnik

a/Kollur

river

EN 170 NCE 2009 dated

27/1/2010 ( 2 MW)27-01-2010

173 Vriddhi Powers Malebahundi Udupi 2.00

Malebahundi MHS

across Malebahundi at

Mavinkar Village of

Kundapura Taluk in

Udupi District

Malebahu

ndi

EN 168 NCE 2009 dated

27/01/2010 (2 MW)27-01-2010

174 Vriddhi Powers

Horihole &

Govindathirth

a

Udupi 4.00

Horihole &

Govindathirtha MHS

across Horihole &

Govinda Tirtha at Mudur

Village of Kundapura

Taluk in Udupi District

Horihole &

Govindaht

irtha

EN 169 NCE 2009 dt 27/1/2010 27-01-2010

Page 39: Allotted to be Commissioned

175 Moodabagil Power Pvt. Ltd. Mugalkhod Belgaum 1.50

Mugalkhod MHS

Mugalkhod LBC at

Mugalkhod village of

Raybag Taluk in

Belgaum District

Ghataprab

ha river

EN 197 NCE 2009 dated

29/1/2010 (2.6 MW),

Corrigendum EN 6 NCE 2014, dt:

19.05.2014 (5 years for

implementation of the

project),Reduced Capacity from

2.6 MW to 1.5 MW) vide GO.No.

EN 194 NCE 2014 dt:

31.10.2014.

29-01-2010

176 Baliyan Power Pvt. Ltd.Narayanpura

river bed Raichur 4.00

across Markandeya river

at Godchinmallki village

of Gokak taluk in

Belgaum Distrct

markande

ya river

EN 258 NCE 2009 dated

29/1/201029-01-2010

177 Akshaya Hydro Power Jadkal Udupi 2.00

Jadkal MHS across

Konki stream at Jadkal

Village of Kundapur

Taluk in Udupi District

Konki

streamEN 295 NCE 2009 dt 29/1/2010 29-01-2010

178 Moodabagil Power Pvt. Ltd. Shambhavi Udupi 3.00

Shambhavi MHS across

Shambhavi river at Attur

Kalkar village of karkala

taluk in Udupi District

Mulki

river/ Bola

Hole/

Sanuru

Hole

EN 172 NCE 2009 dt 29/1/2010

(3 MW), Corrigendum EN 172

NCE 2009 dt: 29.01.2010 ( 5 yrs

for project implemention).

29-01-2010

179Ravi Kiran Power Projects

Pvt. Ltd.Uppugala

Dakshina

Kannada5.00

Uppugala MHS across

Uppugala hole at

Mudakaje village of Sulya

taluk in Dakshina

Kannada district

Uppugala

hole

EN 175 NCE 2009 dated

01/02/2010 (5 MW)01-02-2010

180 Vyshali Energy (P) Ltd Pallatadka Dakshina

Kannada6.75

Pallatadka MHS across

Kalmakar stream,

Palathadka village, sulya

taluk

Kalmakar

Stream

EN 176 NCE 2009 dated

01/02/2010 (6.75 MW)01-02-2010

181 Roshini power Tech Ltd. Megadde Udupi 6.00

Across Megadde hole,

megadde village, karkala

taluk

Megadde

HoleEN 158 NCE 2009 dt 1/2/2010 01-02-2010

182Dishaa Power Corporation

Ltd.Joseph nagar Udupi 4.00

Joseph nagar MHS

across Sita nadi Josph

nagar village, Kundapur

taluk,

Sita river EN 173 NCE 2009 dt 1/2/2010 01-02-2010

Page 40: Allotted to be Commissioned

183Dishaa Power Corporation

Ltd.Suddhahole Udupi 4.00

Across Suddhahole,

Suddha village, Karkala

taluk

Sudha

holeEN 153 NCE 2009 dt 1/2/2010 01-02-2010

184Om Shakthi Power

Producers Bettakumari Hassan 5.00

Bettakumari MHS across

Bettakumari river at

Bhiman kal village of

Sakleshpur Taluk in

Hassan District

Bettakum

ari Stream

EN 143 NCE 2007 dated

05/02/201005-02-2010

185 RSR Power Pvt. Ltd.Sulkere

Moguru

Dakshina

Kannada4.00

Across Aladangadi hole,

near sulkemogaru village

Belthangadi taluk

Aladangad

i StraemEN 571 NCE 2009 dt 8/2/2010 08-02-2010

186Jalashakthi Power Pvt. Ltd.

Satukodige Chikkamagalore 4.00

across Satukodige Hole,

Satukodige village in

Koppa Taluk of

Chikkamagalur District

Satukodig

e Stream

EN 262 NCE 2009 dt 15/2/2010

15-02-2010

187Sterling Estates &

Properties Ltd.Hegadde Chikkamagalore 3.00

Hegadde MHS across

Narle gundi stream at

Hegadde village of

Balehonnur taluk in

Chikkamagalore District

Narlegundi

Stream

EN 125 NCE 2009 dated

16/2/2010 (3 MW)

16-02-2010

188Fortune Five Hydel

Projects Pvt. Ltd.

Kanthamangal

a

Dakshina

Kannada4.50

Kanthamangala MHS

across payaswini river at

Kanthamangala village of

Sulya taluk in Dakshina

Kannada District

Payaswini

riverEN 20 NCE 2008 dt 16/2/2010 16-02-2010

189 Devar Power Ltd. Kilaragadde Uttara kannada 4.00

Kilaragadde MHS across

Kabbinagulehalla stream

at Kilargadde village in

yellapur town & taluk in

Uttara Kannada District

Kabbinagu

lehalla

Stream

EN 386 NCE 2007 dt 16/2/2010

(4 MW)16-02-2010

Page 41: Allotted to be Commissioned

190Godachinamalki Power Pvt.

Ltd.Godchinmallki Belgaum 2.00

across Markandeya river

at Godchinmallki village

of Gokak taluk in

Belgaum Distrct

markande

ya river

EN 153 NCE 2007 dated

17/2/201017-02-2010

191Balaji Biomass Power Pvt.

Ltd.Golapalli Raichur 2.00

Golapalli MHS across

Hatti hole stream a

tributary of krishna river

in golapalli village,

lingasugur taluk

Hattihole

Straem

EN 328 NCE 2007 dated

17/2/2010 (2 MW)17-02-2010

192 Rajalaxmi Hydro Power Halagera Yadgir 1.00

Across Lakshampu nala,

Halagere village,

Shorapur taluk

Bhima

riverEN 163 NCE 2009 dt 17/2/2010 17-02-2010

193 Merit Biozone Ltd. Bhima Yadgir 2.00

Across Bhima river,

kundalli village,

(Kundalli barrage),Yadgir

/ Shapur taluk

Bhima

riverEN 161 NCE 2009 dt 17/2/2010 17-02-2010

194 Punam powers (P) Ltd. Idiga Hassan 7.50

Idiga MHS across

Hemavathi river at

idaganahosur village of

Chennarayapattana

taluk in Hassan District

Hemavathi

river

EN 329 NCE 2007 dt 22/2/2010

(3 MW) Enhancement G.O En

329 NCE 2012 Dated:

01.01.2013(7.5MW)

22-02-2010

195Vijaya Durga Power

Proejcts Pvt. Ltd

Someshwara

Right BankUdupi 5.00

Across right bank of sita

nadi in kelachawadi

village, karkala taluk,

Sita river EN 19 NCE 2008 dt 23/2/2010 23-02-2010

196Sai Spurthi Power Pvt.

Ltd.,Sirsi Uttara kannada 3.00

Sirsi MHS across

Bilihalla river at Muski

Village of Sirsi taluk in

Uttara Kannada District

Bilihalla

Stream

EN 57 NCE 2008 dated

25/02/201025-02-2010

Total 279.83

2010-2011

197Kapila Manjushree

Apparels Pvt. Ltd.Kote Male Kodagu 9.00

across three streams

flowing in Kote Male

Estate, Near Thannimani

Village, Bhagamandala

Town, Madikeri Taluk

kote male

EN 453 NCE 2009 dated 30-04-

2010 & 20-05-2010

30-04-2010

Page 42: Allotted to be Commissioned

198 Greenko Energies Pvt Ltd. Tagachikuppe Ramanagara 6.00

Tagachikuppe MHS,

across Vrushabhavathi

river at Tagachikuppe

Village of Bangalore

south Taluk in Bangalore

Rural district

Vrushabh

avathi

EN 533 NCE 2009 dt 03-05-2010

03-05-2010

199Western Ghats Hydro

Ventures Pvt. Ltd. Gauri Halla Chikkamagalore 4.00

Gauri Halla MHS across

Gauri Halla Stream a

tributory to Vedavati

river at Kamenshalli

Village of Kadur taluk in

Chikkamagalore District

Gaurihalla

EN 267 NCE 2009 dated

10/05/2010 (4 MW)

10-05-2010

200 Rama EnterprisesChikkarsinake

re Mandya 0.50

Chikkarsinakere MHS

across Hebbahalla Nala

(this nala joints the

Shimsha river, which will

further join river cauvery)

at Chikkarasinakere

Village of Maddur Taluk

in Mandya District

Hebbahall

a Stream

EN 513 NCE 2009 dated

14/05/2010

14-05-2010

201 Rama EnterprisesSri

Siddeshwara Davanagere 0.25

Sri Siddeshwara MHS

across Shantisagara tank

(Siddanala &

Basavanala) at Sulikere

Village of Chennagiri

taluk in Davanagere

District

EN 514 NCE 2009 dated

14/05/2010

14-05-2010

202 Energiea Power Company Alugodu Mandya 0.80

Across Vishveshwariah

link canal, near Alugodu

village, Srirangapattana

taluk

EN 515 NCE 2009 dated

14/05/2010

14-05-2010

Page 43: Allotted to be Commissioned

203MAR Fabricators India Pvt.

Ltd.Chaitra Ramanagara 4.00

Chaitra MHS across

Vrishabhavati river near

Sheshgiri halli village in

Bangalore Rural district

Vrushabh

avathi

EN 512 NCE 2009 dated

14/05/201014-05-2010

204MVK Infrastructure Pvt.

Ltd.Balekallu Hassan 4.00

Balekallu MHS across

Balekalluhole a tributory

to Yettinahole at

marenahalli village of

Sakaleshapura Taluk in

Hassan District

Balekalluh

ole Stream

EN 491 NCE 2009 dated

16/09/2010 ( 4 MW)

16-09-2010

205Innoverse Eco Friendly

SolutionsYeliyur Mandya 1.00

Balekallu MHS across

Balekalluhole a tributory

to Yettinahole at

marenahalli village of

Sakaleshapura Taluk in

Hassan District

Balekalluh

ole Stream

EN 271 NCE 2010 dated

16/09/2010 (1 MW)

Corrigendum GO EN 97 NCE

2014 dated 11.09.2014 (time for

implementation of the project 5

years)

16-09-2010

206

Swayambu Power Systems

Pvt. Ltd. Mundelu Chikkamagalore 1.00

Mundelu MHS across a

stream tributory to

Sitanadi at Jayapura

Village of Koppa taluk in

Chikkamagalore District

EN 298 NCE 2010 dated

16/09/2010(1 MW)

16-09-2010

207Acacia Energy Ventures

Pvt. Ltd.Devaralla Hassan 4.00

Devaralla MHS across

Devarahalla Stream at

Maragunda village of

Sakaleshpur Taluk in

Hassan District

Devaralla

Stream

EN 219 NCR 2009 dated

16/09/2010(4 MW)

16-09-2010

208Sree VeeraBhadrehswara

PowerPapaiah Koppala 1.05

Papaiah MHS across

Papaiah Tunnel of

TBLBC, near Mallapura

Village, Gangavathi

Taluk, Koppal District

Thungabh

adra river

EN 296 NCE 2010 dated

16/09/2010(1.05)

16-09-2010

Page 44: Allotted to be Commissioned

209 Sree Mallikarjuna Powers Maddur Mandya 0.95

Maddur MHS across

existing maddur kere

kodi and canal near

Dheshahalli village of

Maddur taluk

Maddur

Kerekodi

EN 259 NCE 2010 dated

16/09/2010(0.95 MW)

Corrigendum EN 4 NCE 2014

dated 19.05.2014 (5 years for

implementation of the project).

16-09-2010

210 VV Energy Pvt. Ltd. Nugu Mysore 1.00

Nugu MHS across Nugu

river at Motha village of

Nanjangud Taluk in

Mysore District

Nugu

Stream

EN 274 NCE 2009 dated

16/09/2010(0.5 MW) EN 221

NCE 2011 dated 20-03-2012

(1MW)

16-09-2010

211Chandu Power Projects

Pvt. Ltd. Maski Raichur 6.00

Across maskihalla at

confluence point of

maski halla and anikat

halla near tarkal village,

Manvi taluk

EN 260 NCE 2010 dated

16/09/2010

16-09-2010

212Surya Chandra Energy (P)

LtdBalganur Raichur 4.00

Across maski halla near

balganur village,

Sindhnur taluk,

EN 265 NCE 2010 dated

16/09/2010 16-09-2010

213 KCP Energy Pvt. Ltd. Hirekadabur Raichur 2.00

Across Maskhi halla near

Hirekadabur village,

Sindhnur taluk

EN 266 NCE 2010 dated

16/09/201016-09-2010

214

Kare Power Resources Pvt.

Ltd. Formerly (Sai Krishna

Hydro Power Pvt Ltd

Hanchinal Raichur 2.00

Hanchinal MHS across

Krishna River, near

Hanchinal Village of

Lingasagur Taluk in

Raichur District

EN 348 NCE 2010 dated

16/09/2010 (2 MW) EN 346 NCE

2012 dated: 27-12-2012 (

Transfered to M/s Kare Power ),

Time Extended from 25.11.2010

for 5 years vide corrigendum

Energy Department letter No. EN

11 NCE 2014 dt: 04.03.2014,

Capacity Enhanced from 2 MW

to 16 MW vide GO.No.EN 226

NCE 2014 dt: 23.05.2015.

16-09-2010

Page 45: Allotted to be Commissioned

215Nimishamba Power Pvt.

Ltd.Amguddehole Shimoga 3.00

Amguddehole MHS

across AmgundeHole at

Yadur village of

Hosanagara Taluk in

Shimoga District

EN 265 NCE 2009 dated

16/09/2010 (3 MW)

16-09-2010

216Brigade Infrastrcture &

Power Pvt. LtdKumadavathi Shimoga 1.00

Kumadavathi river at

Anjanapura village of

Shikaripura taluk in

Shimoga District

EN 272 NCE 2010 dated

16/09/2010(1 MW)16-09-2010

217 Shree Channesha Powers Bhadra Shimoga 5.00

Kumadavathi river at

Anjanapura village of

Shikaripura taluk in

Shimoga District

EN 297 NCE 2010 dated

16/09/2010 (5 MW)16-09-2010

218Adithya Green Power Pvt.

Ltd.Hosur Uttara Kannada 1.00

Hosur MHS across River

Benne Hole at Hosur

village of Sirsi Taluk in

Uttara Kannada District

Bennehole

Stream

EN 345 NCE 2010 dated

16/09/2010 (1 MW)

16-09-2010

219Kare Power Resources Pvt.

Ltd.Ganeshpal Uttara Kannada 24.00

Ganeshpal MHS across

Sonda River at

Ganeshpal Village

Siddapura Taluk in

Uttarakannada District

sonda

river

EN 343 NCE 2010 dated

16/09/2010 (24 MW)

16-09-2010

220Sree VeeraBhadrehswara

PowerKapila Chikkamagalore 1.05

Kapila MHS across

existing weir of

Kapilahalla at

Kuduregundi Village of

Koppa taluk in

Chikkamagalore District

Shisila/ka

pila

Stream

EN 295 NCE 2010 dated

17/09/2010 (1.05 MW)

17-09-2010

221 Samrudhi Hydro Energy KRS Mandya 1.22

across Right Bank low

level canal on

downstream of KRS Dam

at Kannambadi village of

Sriranagapatna taluk in

Mandya District

EN 511 NCE 2009 dated

17/09/2010, corrigendum EN

217 NCE 2013 dated 17.09.2013

17-09-2010

Page 46: Allotted to be Commissioned

222Chandu Power Projects

Pvt. Ltd. Devipur Raichur 5.00

Across maskihalla near

devipur village, Sindhnur

taluk,

EN 261 NCE 2010 dated

16/09/2010 & Corrigendum EN

278 NCE 2011 dated 25.06.2011

(taluk changed from Sindhanur

to Maanvi)

16-09-2010

223Bellandur Power Projects

Pvt. Ltd.Bellandur -II

Bangalore

urban1.50

Bellandur -II Across

Bellandur Tank, near

Yamalur Village,

Bangalore Taluk &

District

EN 269 NCE 2010 dated

03/11/201003-11-2010

224Bellandur Power Projects

Pvt. Ltd.Bellandur -I

Bangalore

urban1.50

Bellandur -I Across

Bellandur Tank, near

Bellandur Village,

Bangalore Taluk &

District

EN 270 NCE 2010 dated

03/11/201003-11-2010

225Bellandur Power Projects

Pvt. Ltd.Varthur-I

Bangalore

urban1.00

Varthur-I Across Varthur

Tank, near Varthur

Village, Bangalore Taluk

& District

EN 268 NCE 2010 dated

03/11/201003-11-2010

226Sai Krishna Hydro Power

Pvt. Ltd.Gonavatal Raichur 2.00

Gonavatal MHS across

Krishna River, near

Gonavatal Village,

Lingasagur Taluk,

Raichur District.

EN 346 NCE 2010 dated

25/11/2010 EN 346 NCE 2012

dated: 27-12-2012 ( Transfered

to M/s Kare Power ),Time

Extended from 25.11.2010 for 5

years vide corrigendum Energy

Department letter No. EN 11

NCE 2014 dt: 04.03.2014,

Corrigendum EN 195 NCE 2013

dated 08.11.2013 (PPA/Third

party), Corrigendum

10-05-10

Total 98.82

2011-2012

227Gulbarga Bio Energy Pvt

Ltd.(Thulasi Energy)Baggadanalu Davanagere 2.00

Baggadanalu MHS

Across Thungabhadra

River, near Baggadanalu

Village, Honnale Taluk,

Davanegere dist.

Thungabh

adra river

EN 284 NCE 2007 dated

13/06/201113-06-2011

Page 47: Allotted to be Commissioned

228Gulbarga Bio Energy Pvt

Ltd.(Thulasi Energy)Hallur Davanagere 2.00

Hallur MHS across

Tungabhadra river of

Honnali Taluk in

Davanagere District

Thungabh

adra river

EN 285 NCE 2007 dated

13/06/201113-06-2011

229Gulbarga Bio Energy Pvt

Ltd.(Thulasi Energy)Govinalu Davanagere 2.00

Govinalu MHS across

Tungabhadra river of

Honnali Taluk in

Davanagere District

Thungabh

adra river

EN 282 NCE 2007 dated

13/06/201113-06-2011

230 KGK Power Pvt. Ltd. Mundaje Dakshina

Kannada3.00

Mundaje MHS across

Mundaje Stream at

Mundaje village of

Belthangadi taluk in

Dakshina Kannada

District

Mundaje

Stream

EN 263 NCE 2009 dated

29/07/2011 (3 MW), 29-07-2011

231JSR Power Projects Pvt.

Ltd.

Sivayogamand

ir Bagalkot 3.00

Sivayogamandir MHS

across Malaprabha river

of Badami Taluk in

Bagalkot District

Malaprabh

a river

EN 193 NCE 2011 Dtd 31-10-

2011,Corrigendum for

implementation of project within

5 years vide EN 62 NCE 2014 dt:

03.04.2014

31-10-2011

232Sai Aksha Power Projects

Pvt. Ltd. Harakeri Shimoga 2.00

Harakeri MHS across

Tunga river at Harakeri

Village of Shimoga Taluk

Shimoga District

Thunga

river

EN 191 NCE 2011 dated

31/10/201131-10-2011

233Lakshmi Amritha Power

Projects Pvt. Ltd.Cholachagud Bagalkot 2.00

Cholachagud MHS

across Malaprabha river

of Badami Taluk in

Bagalkot District

Malaprabh

a river

EN 199 NCE 2011 Dtd 31-10-

2011, Corrigendum for

implementation of project within

5 years vide EN 63 NCE 2014 dt:

25.04.2014.

31-10-2011

234 Sai Simrita Power Pvt. Ltd. Balleshwara Davanagere 2.00

Balleshwara MHS across

Tungabhadra river in

Honnalli taluk of

Davangere district about

7km downstream of the

confluence of the Honalli

town.

Thungabh

adra river

EN 261 NCE 2011 dated

31/10/201131-10-2011

Page 48: Allotted to be Commissioned

235 KKV Energy India Pvt. Ltd. Nalgamdinni Raichur 4.00

Nalgamdinni MHS across

Maski halla near

Nalgamdinni village of

Manvi Taluk in Raichur

District

Maski

Halla

EN 110 NCE 2011 Dtd 2-11-

201102-11-2011

236 P6 Energy Pvt. Ltd. Ballenahalli Mandya 2.00

Ballenahalli MHS across

Lokapavani river at

Ballenahalli village of

Srirangapatna Taluk in

Mandya District

Lokapavan

i riverEN 44 NCE 2011 Dtd 2-11-2011 02-11-2011

237Surya Chandra Wind

Energy (P) Ltd.Vaderhalli Ramanagara 3.00

Vaderalli MHS across

suvarnamukhi river at

vaderhalli village of

Kanakapura taluk in

Ramanagara district

Vrushabh

avathiEN 43 NCE 2011 Dtd. 2-11-2011 02-11-2011

238UMR Power Projects Pvt.

Ltd. Abbur Hassan 2.00

Abbur MHS across

Soteabburhalla at K.

Abbur Village of

Arakalagud Taluk in

Hassan District

Soteabbur

halla

EN 111 NCE 2011 dated

03/11/2011(2 MW)03-11-2011

239 Atria Brindavan Power Ltd.Hanumanahal

la Mandya 8.00

Hanumanahalla MHS

cauvery river at

Chikkayarahalli village of

Pandavapura Taluk in

Mandya district

Cauvery

river08-11-2011

No

Number to

be given

since

merged

with

Sl.No.(239)

Atria Brindavan Power Ltd. Visveswara Mandya 12.00

Visveswara MHS across

cauvery river at

Chikkayarahalli village of

Pandavapura Taluk in

Mandya district

Cauvery

river08-11-2011

EN 109 NCE 2011 dated

08/11/2011(6 MW) and

Capacity Enhanced vide GO

No. EN 213 NCE 2012 dated

:21/07/2012 (from 6 MW to

12 MW),Capacity enhanced

from 4 MW to 8 MW vide G.O.

EN 214 NCE 2012 dated:

21/07/2012, EN 128 NCE

2011 dated 08/11/2011 (8

MW), Both Projects of File No.

SH - 771 of 12 MW and SH-

772 of 8 MW merged vide

GO.No. EN 18 NCE 2013 dt:

08.07.2014 (20 MW)

Page 49: Allotted to be Commissioned

240Innoverse Eco Friendly

Solutions

Thimmana

hosur Mandya 0.40

Thimmana hosur MHS

across V.C. Canal-

Malavalli Branch, at

Thimmana hosur village

of Kotathi Hobli in

Mandya Taluk/District

Cauvery

river

EN 45 NCE 2011 dated

10/11/201110-11-2011

241 BVH Hydel Pvt Ltd. Markandeya Belgaum 0.90

Markandeya MHS across

Markandeya reservoir at

Shirur Village of Hukkeri

Taluk in Belgaum

District

EN 39 NCE 2011 Dtd 17-11-

2011, capacity Enhanced from

0.5 Mw to 0.9 Mw vide GO.No.

EN 209 NCE 2013 dt:

25.10.2013.

17-11-2011

242 Chandana Energy (P) Ltd. Kataknur Raichur 2.00

Kataknur MHS across

Thungabhadra river at

Kataknur village of Manvi

taluk in raichur district

Thungabh

adra river

EN 195 NCE 2011 Dtd 17-11-

201117-11-2011

243

Swayambu Power Systems

Pvt. Ltd. Bandi Chikkamagalore 2.00

Bandi MHS across

Bandihole Stream at

Bandihole village of

N.R.Pura Taluk in

Chikkamagalore District

Bandihole

Stream

EN 117 NCE 2010, Bangalore dt:

13.03.201213-03-2012

53.90

2012-2013

244Pavanaganga Power Pvt.

Ltd.

Huvinahedaga

li yadgir 21.50

Huvinahedagali MHS,

across LBC of Krishna

river, Maramakal Village,

Shahapur Taluk,

Gulbarga District.

Krishna

river

EN 129 NCE 2012 dated 05-

04-2012, Corrigendum GO

EN 129 NCE 2012 dt:

01.03.2013 (Changed the

location from RBC to LBC of

Krishna River), Allotted vide

GO.No. EN 224 NCE 2011,

dt: 27.01.2012.

05-04-2012

245Evergreen Energy

Enerprises (I) Pvt. LtdNagartal Bagalkot 1.60

Nagartal MHS across

Malaprabha river at

Kattapura village of

Badam taluk in Bagalkot

district

Malaprabh

a river

G.O. EN 198 NCE 2012 dated:

11/07/201211-07-2012

Page 50: Allotted to be Commissioned

246Evergreen Energy

Enerprises (I) Pvt. LtdHasangi Bagalkot 1.60

Hasangi MHS across

Malaprabha river at

Kattapura village of

Badam taluk in Bagalkot

district

Malaprabh

a river

G.O. EN 199 NCE 2012 dated:

11/07/201211-07-2012

247Evergreen Energy

Enerprises (I) Pvt. LtdRamtal Bagalkot 1.60

Ramtal MHS across

Malaprabha river at

Kattapura village of

Badam taluk in Bagalkot

district

Malaprabh

a river

G.O. EN 197 NCE 2012 dated:

11/07/201211-07-2012

248Evergreen Energy

Enerprises (I) Pvt. LtdKattapura Bagalkot 1.60

Karmuddanahalli MHS,

across Karmuddanahalli

stream,

Karmuddanahalli Village,

Hunsor Taluk, Mysore

District

G.O. EN 200 NCE 2012 dated:

11/07/201211-07-2012

249Bhoruka Power

Corporation LtdBasavasagar Yadgir 15

Across river krishna on

the leftbank,at

narayanpur

village,Shorapur

taluk,yadgir Dist

krishnaEN 195 NCE 2012 dated 11-07-

201211.07.2012

250

ADD Energy

Management Company

Pvt Ltd., (Special

Purpose Vehicle

Company), Formerly

Subhash Kabini Power

Corporation Pvt. Ltd.

Varuna RBC Mandya 2

across Varuna low level

RBC near Kannambadi

vlllage of Srreerangaptna

Taluk in Mandya District

EN 209 NCE 2012/29-08-12,

Change of Company Name

from Subhash Kabini to M/s.

ADD Energy Management

Company Pvt Ltd., (Special

Purpose Vehicle Company)

vide GO.No. EN 167 NCE

2015,dt: 30.10.2015.

Capacity enhanced from 2

MW to 4 MW vide Go.No. EN

37 NCE 2014 dt: 22.12.2015.

29-08-2012

Page 51: Allotted to be Commissioned

251Evergreen Energy

Enerprises (I) Pvt. LtdMalaprabha Bagalkot 1.60

Aihole MHS across

Malaprabha river at

Kattapura village of

Badam taluk in Bagalkot

district

Malaprabh

a river

EN 196 NCE 2012 dated

12/09/201212-09-2012

252 Flow net power Pvt. Ltd.

Balluru

(Bhandar)

Formerly

Baluru

Mysore 3.00

Across River Kaveri,

Chinga Village, K.R.

Nagar Raluk, Mysore

District

Kaveri

EN 330 NCE 2012 dt: 11-02-

2013, Corrigendum issued

vide Letter No. EN 264 NCE

2015 dt: 04.12.2015 to read

as (Balluru)(Bhandar) instead

of Baluru MHS.

11-02-2013

253Grandville Energy Pvt.

Ltd.Yennehole Mandya 3.00

Yennehole MHS

Across Cauvery River,

Yennehole Koppalu,

Pandavapura Taluk,

Mandya Dist.

EN 184 NCE 2011 dated: 07-

03-201307.03.2013

Total 52.50

2013-2014

254Brahadeeswara Power

Projects Private Limited

Ranganathapu

raMysore 4.50

across cauvery river,

near ranganthapura

village, Mysore District

CauveryEN 205 NCE 2012 dated: 09-05-

201309-05-2013

255

Madyaranga Energy

Private Limited formerly

(Shri Vikram Sreeram)

Barachukki

MHS

Chamarajanaga

r5.00

In Cauvery River, reach

about 600 Meter

downstream of

Barachukki falls of left

bank, near

shivanasamudram

village, Palaya Hobli,

Kollegal Taluk,

Chamaraja Nagar District

Cauvery EN 20 NCE 2013,Dt:21.05.2013 21.05.2013

256Karthik Hydro projectspvt

ltd Shoirol Gadag 2.00

Shirol MHS Nragund

Taluk, Gadag District

Malaprabh

a riverEN 117 NCE 2013 Dt:27.05.2013 27.05.2013

Page 52: Allotted to be Commissioned

257Karthik Energy Resource

Pvt. Ltd. Banave Mysore 6.00

Banave MHS across

Cauvery river at Banave

villafe of T. Narasipura

Taluk in Mysore District

Cauvery

river

EN 317 NCE 2012 dt:

01.07.201301.07.2013

258Sai Sri Power Projects &

Systems Pvt. Ltd.Bukkasagar Bellary 2.00

Bukkasagra MHS across

Tunga Bhadra river at

Bukkasagara Village of

Hospet Taluk in Bellary

District

Thungabh

adra river

EN 271 NCE 2009 dt:

02.07.201302.07.2013

259 Master Marine Akkihebal Mandya 3.00

Akkihebbal MHS near

Akkihebbal village in

K.R Pet Taluk of

Mandya District

Hemavat

hi river

EN 198 NCE 2013 dt:

10.10.201310.10.2013

260GSSMR Energy Private

Limited

Bommanaha

lli Yadgir 1.40

Bommanahalli MHS

across Distributory-6

Canal of Shahapur

Branch Canal of NLBC

at Bommanahalli

village of Shorapur

Taluk in Yadgir

District

Krishna

river

EN 223 NCE 2013, dt:

31.10.201331.10.2013

261 Glenco Gokak Canal Belgaum 0.25

Gokak Canal MHS

across Ghataprabha

river Gokak Left Bank

Canal between 4th &

5th KM at

Ghataprabha vilalge of

Gokak taluk in

Belagavi district

Ghatapra

bha river

EN 238 NCE 2013 dt:

16.11.2013 (Corrigendum

issued for changes in Lat &

Long details vide Energy

Department letter No. EN 43

NCE 2014 dt: 03.03.2014.

Agreement executed on

08.08.2014

16.11.2013

Page 53: Allotted to be Commissioned

262 SBKBommanaha

lli Shimoga 3.50

Bommanahalli MHS

across Bhadra river at

Bommanahalli village

of Bhadravathi Taluk

in Shimoga District

Bhadra

river

EN 51 NCE 2011, dt:

18.11.201318.11.2013

263 Vishista Holding

Bevinahalli

Branch

Canal MHS

Davanagere 1.60

Bevinahalli MHS

across Bhadra river

BRBC between

chainage 38.1 and

40.3 of Malebennur

Branch Canal at

Bevinahalli Village of

Harihar Taluk in

Davanagere District.

Bhadra

River

EN 237 NCE 2013,dt:

19.11.201319.11.2013

264LK Power Corporation

Ltd.Mudhol Bagalkot 1.00

Mudhol MHS across

Ghataprabha LBC at

Mantooor vilalge of

Mudhol Taluk

Ghatapra

bha river

1) EE 131 NCE 2000 dt:

08.12.2000 2) EE 205

NCE 2002 dt: 25.08.2004

(Cancelled)

3) EE 434 NCE 2004 dt:

06.01.05 (Restored to

Shivkumar)

4) EN 378 NCE 2009 dt:

27.07.09 (Cancelled G.O) ,

Restored vide GO.No. EN

1689 NCE 2012 dt:

09.12.2013 and Time

extended for 2 years from

09.12.2013.

08.12.2000

Page 54: Allotted to be Commissioned

265

Mimesis Hydel Projects

(P) Ltd.

#12/1, Next to Canara

Bank,

(Oriental Insurance

Building)

Bellary Road, Hebbal,

Bangalore- 560 024

Arakere Raichur 2.00

across Narayanapura

RBC from Chainage

100 to Chainage 104

at arakere village of

Devadurga Taluk in

raichur District

Krishna

river

EN 85 NCE 2013, dt:

04.03.201404.03.2014

Total 35.75

2014-2015

268Glencoe Power Private

LimitedHarabele Ramanagara 0.40

Harobele Village,

Kanakapura Taluk,

Ramanagaram District

Cauvery

river

GO.No. EN 118 NCE 104, dt:

25.11.201425.11.2014

04.03.2014

04.03.2014EN 86 NCE 2013 dt:

04.03.2014

Maldkal MHS, canal

based project of NRBC

between Chainage 108

and 115 near Maldkal

Village, Dodurga

Taluk, Raichur

District

Narayana

pura

Dam

Krishna

river

267 Raichur 2.00Mimesis Power Projects

Private Limited

Maldkal

Scheme -1

(750 KW)

Scheme- 2

(750 KW)

Scheme - 3

(500 KW)

Nagoli

Scheme -1

(0.5 MW)

Scheme-2 (1

MW)

Mimesis Power Projects

(P) LtdRaichur

EN 219 NCE 2013 dt:

04.03.20141.50266

Near Nagoli &

Agrahara village

Deodurga Raichur

Page 55: Allotted to be Commissioned

269Glencoe Power Private

LimitedSrinivaspura Raichur 0.30

Across Tungabhadra

dam left bank cannal

54th branch channel

6th KM in

srinivaspura grama,

sindhanur Taluk,

Raiuchur Taluk.

Tungabh

adra

Go.No. EN 116 NCE 2014,

dt: 23.12.2014.23.12.2014

No

Number to

be given

Narayanapur Power

Company Ltd.,

Somanamar

adi Raichur 12

Narayanapur RBC,

across Krishna river,

Somanamaradi village

of Deodurga Taluk in

Raichur Dictrict

Krishna

river

DE 125 NCE 96 (13) dated

10.6.1997 (12 MW), Capacity

enhanced from 12 MW to 24

MW vide GO.No. EN 121 NCE

2014 dt: 28.01.2015 (24 MW).

10.06.1997

Total 12.70

2015-2016

270Kare Power Resources Pvt.

Ltd.Tangarbal-II Raichur 9

Across River Krishna

Kadardaagaddi village,

Lingasur Taluk Raichur

Dist.

Krishna

river

Allotted vide Go.No. EN 332 NCE

2012 dt: 07.04.2015 (9

MW)

07.04.2015

No

Number to

be given

Capacity

Enhanced

of Sl.No.

(112)

Mahadeshwara Power Pvt.

Ltd.Gandhinagar

Chamarajanaga

r 19.75

Across Cauvery River

near Gandhi

Nagar/Tellanur Village,

in Kolegal Taluk,

Chamarajnagar District.

Cauvery

river

Allotted vide Go.No. EN 62

NCE 2009, Dated

17/02/2009 ( 5 MW) ,

Capacity enhanced vide

Go.No. EN 84 NCE 2015 dt:

04.05.2015.(19.75 MW), Total

allotted Capacity (24 MW)

17-02-2009

Page 56: Allotted to be Commissioned

No

Number to

be given

Capacity

Enhanced

of Sl.No.

(214)

Kare Power Resources Pvt.

Ltd. Formerly (Sai Krishna

Hydro Power Pvt Ltd

Hanchinal Raichur 14.00

Hanchinal MHS across

Krishna River, near

Hanchinal Village of

Lingasagur Taluk in

Raichur District

EN 348 NCE 2010 dated

16/09/2010 (2 MW) EN 346

NCE 2012 dated: 27-12-2012

( Transfered to M/s Kare

Power ), Time Extended from

25.11.2010 for 5 years vide

corrigendum Energy

Department letter No. EN 11

NCE 2014 dt: 04.03.2014,

Capacity Enhanced from 2

MW to 16 MW vide GO.No.EN

226 NCE 2014 dt:

23.05.2015.

16-09-2010

No

Number to

be given

Capacity

Enhanced

of

SL.No.(60)

Kukke Hydro Projects Pvt.

Ltd.Kukke Stage-2

Dakshina

Kannada1.75

Kukke Stage-2 MHS

across river

Kumaradhara between

Kodimbala village of

Puttur Taluk &

Edamangala village of

Sulya taluk in Dakshina

Kannada District

Kumaradh

ara river

DE 224 NCE 2005 dated

19/08/2005(12 MW to M/s

Fiza Developers & Inter Trade

Pvt. Ltd. ), EN 1 NCE 2008

dated 07/01/2008(12 MW to

22.75), EN 1 NCE 2009 dated

25/03/2009(change of name

to M/s Kukke Hydro Projects

Pvt. Ltd.), EN 126 NCE

2011(2) dated 26/03/2011

(seperation of G.O.s),

Capacity enhanced from

10.25 MW to 12 MW vide

GO.No. EN 19 NCE 2015, dt:

08.10.2015.

19-08-2005

Page 57: Allotted to be Commissioned

No

Number to

be given

Capacity

Enhanced

of SL.No.

(68)

Instrument & Systems Banasamudra Mandya 1.00

across Shimsha river

near Banasamudra

village in Mandya District

Shimsha

river

G.O. No. EN 301 NCE 2005

dated 14/10/2005, Capacity

enhanced from 1MW to 2 MW

vide GO.No. EN 13 NCE 2013

dt: 14.12.2015.

14-10-2005

No

Number to

be given

Capacity

Enhanced

for

Sl.No.(250)

ADD Energy

Management Company

Pvt Ltd., (Special

Purpose Vehicle

Company), Formerly

Subhash Kabini Power

Corporation Pvt. Ltd.

Varuna RBC Mandya 2

across Varuna low level

RBC near Kannambadi

vlllage of Srreerangaptna

Taluk in Mandya District

EN 209 NCE 2012/29-08-12,

Change of Company Name

from Subhash Kabini to M/s.

ADD Energy Management

Company Pvt Ltd., (Special

Purpose Vehicle Company)

vide GO.No. EN 167 NCE

2015,dt: 30.10.2015.

Capacity enhanced from 2

MW to 4 MW vide Go.No. EN

37 NCE 2014 dt: 22.12.2015.

29-08-2012

No

Number to

be given

Capacity

Enhanced

of

Sl.No.(85)

Kodekal Basaveswara

Power Generation Pvt. Ltd.Yadgir 8.00

Across doni river near

Kodekal Village,

shorapur Taluk, gulbarga

District.

Doni river

EN 343 NCE 2006 dated

16.10.2006, Capacity

enhanced from 2 MW to 10

MW and Time Extended fom

16.10.2011 to 31.03.2016

vide GO.No. EN 281 NCE

2012 dt: 11.02.2016.

16-10-2006

Total 55.50

2016-2017

Page 58: Allotted to be Commissioned

271Anandur Power Projects

LLPAnandur Hassan 6

across River Cauvery,

Bettasoge/ Anandur

Village, Arkalgud

Taluk, Hassan

District.

CauveryAllotted vide GO.No. EN 78

NCE 2016, dt: 05.05.201605.05.2016

Total 6.00

2017-2018

272SAY Power Private

Limited Biligeri MHS Kodagu 3

across Nandimotte

river, Biligeri Village,

Madhapura Hobli,

Somwarpet Taluk,

Kodugu Districtt

Nandimot

te

Allotted vide GO.No. EN 59

NCE 2017, dt: 24.05.201724.05.2017

Total 3.00

Overall Total 1521.18