Kiski Area High School Allegheny Township, PA Sarah Haynes Architectural Engineering – CM Option Spring 2004

Allegheny Township, PA · Size: Approx. 268,200 SF Cost Information: Lump Sum Cost - $39.7 million Project Delivery Method: Design-Bid-Build w/ Single Prime Contract Project Overview:

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Allegheny Township, PA · Size: Approx. 268,200 SF Cost Information: Lump Sum Cost - $39.7 million Project Delivery Method: Design-Bid-Build w/ Single Prime Contract Project Overview:

Kiski Area High SchoolAllegheny Township, PA

Sarah HaynesArchitectural Engineering – CM OptionSpring 2004

Page 2: Allegheny Township, PA · Size: Approx. 268,200 SF Cost Information: Lump Sum Cost - $39.7 million Project Delivery Method: Design-Bid-Build w/ Single Prime Contract Project Overview:

Introduction

Project Information

Floor System Analysis

Mechanical Analysis

Research

Conclusions

Presentation Outline

I. Project Information

II. Floor System Analysis

III. Mechanical Analysis

IV. Suggested Improvements from Contractors:

VI. Conclusions

Kiski Area High SchoolAllegheny Township, PA

Sarah Haynes

Perspective of Architectural Professionals

Page 3: Allegheny Township, PA · Size: Approx. 268,200 SF Cost Information: Lump Sum Cost - $39.7 million Project Delivery Method: Design-Bid-Build w/ Single Prime Contract Project Overview:

Project Information

Kiski Area High SchoolAllegheny Township, PA

Sarah Haynes

Introduction

Project Information

Floor System Analysis

Mechanical Analysis

Research

Conclusions

Page 4: Allegheny Township, PA · Size: Approx. 268,200 SF Cost Information: Lump Sum Cost - $39.7 million Project Delivery Method: Design-Bid-Build w/ Single Prime Contract Project Overview:

Kiski Area High SchoolAllegheny Township, PA

Project Information

Owner: Kiski Area School DistrictBoard of Directors

Architect: Canzian / Johnston & Associates

General Contractor: P.J. Dick

Structural Engineer: Watson Engineering

Mechanical Engineer: Ray Engineering

Plumbing Engineer: Pedicone Engineering Consultants

Electrical Engineer: Starr Engineering

Geotechnical/ Civil: Ackenheil Engineers

Project Team:

Sarah Haynes

Introduction

Project Information

Floor System Analysis

Mechanical Analysis

Research

Conclusions

Page 5: Allegheny Township, PA · Size: Approx. 268,200 SF Cost Information: Lump Sum Cost - $39.7 million Project Delivery Method: Design-Bid-Build w/ Single Prime Contract Project Overview:

Project Information

Kiski Area High SchoolAllegheny Township, PA

Location: Allegheny Township, Westmoreland Co.

Dates of Construction: April 2003 – April 2005

Size: Approx. 268,200 SF

Cost Information: Lump Sum Cost - $39.7 million

Project Delivery Method: Design-Bid-Build w/ Single Prime Contract

Project Overview:

Sarah Haynes

Introduction

Project Information

Floor System Analysis

Mechanical Analysis

Research

Conclusions

Page 6: Allegheny Township, PA · Size: Approx. 268,200 SF Cost Information: Lump Sum Cost - $39.7 million Project Delivery Method: Design-Bid-Build w/ Single Prime Contract Project Overview:

Project Information

Kiski Area High SchoolAllegheny Township, PA

Project Description:

Bldg ‘C’Bldg ‘B’ Bldg

‘A’

Bldg ‘J’

Bldg ‘E’

Bldg ‘F’Bldg ‘G’

Bldg ‘H’

Bldg ‘D’

Bldg ‘K’

Renovations and additionsto eight (8) existing buildings

Demolition of one (1) existingbuilding

Bldg ‘N’Construct Building ‘N’ & Building ‘K’

Sarah Haynes

Introduction

Project Information

Floor System Analysis

Mechanical Analysis

Research

Conclusions

Page 7: Allegheny Township, PA · Size: Approx. 268,200 SF Cost Information: Lump Sum Cost - $39.7 million Project Delivery Method: Design-Bid-Build w/ Single Prime Contract Project Overview:

Project Information

Kiski Area High SchoolAllegheny Township, PA

Project Description:

Building ‘N’ - 90,000 SF two-story structure- serves as the main entrance to the high school- contains science classrooms, offices, etc.

Building ‘K’ - 60,000 SF two-story structure - contains a gymnasium, additional locker rooms, offices, etc.

Sarah Haynes

Introduction

Project Information

Floor System Analysis

Mechanical Analysis

Research

Conclusions

Page 8: Allegheny Township, PA · Size: Approx. 268,200 SF Cost Information: Lump Sum Cost - $39.7 million Project Delivery Method: Design-Bid-Build w/ Single Prime Contract Project Overview:

Floor System Analysis

Kiski Area High SchoolAllegheny Township, PA

Sarah Haynes

Introduction

Project Information

Floor System Analysis

Mechanical Analysis

Research

Conclusions

Page 9: Allegheny Township, PA · Size: Approx. 268,200 SF Cost Information: Lump Sum Cost - $39.7 million Project Delivery Method: Design-Bid-Build w/ Single Prime Contract Project Overview:

Floor System Analysis

Kiski Area High SchoolAllegheny Township, PA

Existing Floor System:

Structural steel frame

3” slab on 3” metal deck

Sarah Haynes

Introduction

Project Information

Floor System Analysis

Mechanical Analysis

Research

Conclusions

Goals:

Decrease schedule

Decrease cost

Page 10: Allegheny Township, PA · Size: Approx. 268,200 SF Cost Information: Lump Sum Cost - $39.7 million Project Delivery Method: Design-Bid-Build w/ Single Prime Contract Project Overview:

Floor System Analysis

Kiski Area High SchoolAllegheny Township, PA

Proposed Floor System:

Structural Steel Frame

8” Prestressed Concrete Plank (2” C.I.P. Topping)

Sarah Haynes

Introduction

Project Information

Floor System Analysis

Mechanical Analysis

Research

Conclusions

Page 11: Allegheny Township, PA · Size: Approx. 268,200 SF Cost Information: Lump Sum Cost - $39.7 million Project Delivery Method: Design-Bid-Build w/ Single Prime Contract Project Overview:

Floor System Analysis

Kiski Area High SchoolAllegheny Township, PA

Sarah Haynes

Site Layout & Access:

Introduction

Project Information

Floor System Analysis

Mechanical Analysis

Research

Conclusions

Confined site

Erection Sequence

Page 12: Allegheny Township, PA · Size: Approx. 268,200 SF Cost Information: Lump Sum Cost - $39.7 million Project Delivery Method: Design-Bid-Build w/ Single Prime Contract Project Overview:

Floor System Analysis

Kiski Area High SchoolAllegheny Township, PA

Sarah Haynes

Original Schedule:

Introduction

Project Information

Floor System Analysis

Mechanical Analysis

Research

Conclusions

Proposed Schedule:

Additional 12 days to erect

15 days to erect steel – 30 days to detail

50 days total for slab pours and steel erection

Page 13: Allegheny Township, PA · Size: Approx. 268,200 SF Cost Information: Lump Sum Cost - $39.7 million Project Delivery Method: Design-Bid-Build w/ Single Prime Contract Project Overview:

Floor System Analysis

Kiski Area High SchoolAllegheny Township, PA

Sarah Haynes

Costs:

Introduction

Project Information

Floor System Analysis

Mechanical Analysis

Research

Conclusions

$42,405$54,893Total

$35,873$37,043Steel$6,532$17,850Floor Slab

SlabPrestressed Plank Total Costs

Page 14: Allegheny Township, PA · Size: Approx. 268,200 SF Cost Information: Lump Sum Cost - $39.7 million Project Delivery Method: Design-Bid-Build w/ Single Prime Contract Project Overview:

Floor System Analysis

Kiski Area High SchoolAllegheny Township, PA

Sarah Haynes

Recommendation:

Introduction

Project Information

Floor System Analysis

Mechanical Analysis

Research

Conclusions

Site Layout

Schedule

Cost

Page 15: Allegheny Township, PA · Size: Approx. 268,200 SF Cost Information: Lump Sum Cost - $39.7 million Project Delivery Method: Design-Bid-Build w/ Single Prime Contract Project Overview:

Mechanical Analysis

Kiski Area High SchoolAllegheny Township, PA

Sarah Haynes

Introduction

Project Information

Floor System Analysis

Mechanical Analysis

Research

Conclusions

Page 16: Allegheny Township, PA · Size: Approx. 268,200 SF Cost Information: Lump Sum Cost - $39.7 million Project Delivery Method: Design-Bid-Build w/ Single Prime Contract Project Overview:

Mechanical Analysis

Kiski Area High SchoolAllegheny Township, PA

Existing Mechanical System:

Two (2) gas-fired Boilers

Total of 23 AHU’s serve Building ‘N’

AHU-4N – Largest airflow

Services approx. 9,400 SF

Services offices, conference rooms, etc.

Sarah Haynes

Introduction

Project Information

Floor System Analysis

Mechanical Analysis

Research

ConclusionsGoal:

Decrease energy costs

Page 17: Allegheny Township, PA · Size: Approx. 268,200 SF Cost Information: Lump Sum Cost - $39.7 million Project Delivery Method: Design-Bid-Build w/ Single Prime Contract Project Overview:

Mechanical Analysis

Kiski Area High SchoolAllegheny Township, PA

Proposed Mechanical System:

Enthalpy wheel

Benefits:

- reliable operation- low maintenance and operating costs- long life expectancy

Sarah Haynes

Introduction

Project Information

Floor System Analysis

Mechanical Analysis

Research

Conclusions

Page 18: Allegheny Township, PA · Size: Approx. 268,200 SF Cost Information: Lump Sum Cost - $39.7 million Project Delivery Method: Design-Bid-Build w/ Single Prime Contract Project Overview:

Mechanical Analysis

Kiski Area High SchoolAllegheny Township, PA

Energy Savings:

Sarah Haynes

Costs:

Initial Cost:

Cost Savings:

Annual Maintenance Costs: $1800 /yr

Lifecycle Cost (20yr, 5%): $41,930

$9200 /yr

$19,500

Payback Period: Approx. 2.5 yr!!

Introduction

Project Information

Floor System Analysis

Mechanical Analysis

Research

Conclusions

Total: 986 M BTU’s or 961 Mcf

Page 19: Allegheny Township, PA · Size: Approx. 268,200 SF Cost Information: Lump Sum Cost - $39.7 million Project Delivery Method: Design-Bid-Build w/ Single Prime Contract Project Overview:

Mechanical Analysis

Kiski Area High SchoolAllegheny Township, PA

Recommendation:

Sarah Haynes

Introduction

Project Information

Floor System Analysis

Mechanical Analysis

Research

Conclusions

Energy Savings

Payback Period

Page 20: Allegheny Township, PA · Size: Approx. 268,200 SF Cost Information: Lump Sum Cost - $39.7 million Project Delivery Method: Design-Bid-Build w/ Single Prime Contract Project Overview:

Suggested Improvements for Contractors:

Kiski Area High SchoolAllegheny Township, PA

Sarah Haynes

Perspective of Architectural Professionals

Introduction

Project Information

Floor System Analysis

Mechanical Analysis

Research

Conclusions

Page 21: Allegheny Township, PA · Size: Approx. 268,200 SF Cost Information: Lump Sum Cost - $39.7 million Project Delivery Method: Design-Bid-Build w/ Single Prime Contract Project Overview:

Suggested Improvements for Contractors:

Kiski Area High SchoolAllegheny Township, PA

Introduction:

Idea was suggested at PACE Roundtable

Sarah Haynes

Relevant to many projects

Perspective of Architectural ProfessionalsIntroduction

Project Information

Floor System Analysis

Mechanical Analysis

Research

Conclusions

Page 22: Allegheny Township, PA · Size: Approx. 268,200 SF Cost Information: Lump Sum Cost - $39.7 million Project Delivery Method: Design-Bid-Build w/ Single Prime Contract Project Overview:

Kiski Area High SchoolAllegheny Township, PA

Methodology:

Sarah Haynes

Suggested Improvements for Contractors:Perspective of Architectural Professionals

Developed survey

Sent to design professionals within the Pittsburgh and Virginia-DC area

Introduction

Project Information

Floor System Analysis

Mechanical Analysis

Research

Conclusions

Page 23: Allegheny Township, PA · Size: Approx. 268,200 SF Cost Information: Lump Sum Cost - $39.7 million Project Delivery Method: Design-Bid-Build w/ Single Prime Contract Project Overview:

Kiski Area High SchoolAllegheny Township, PA

Sarah Haynes

Results:

Suggested Improvements for Contractors:Perspective of Architectural Professionals

Percentage of Respondents Years Working in the Design Industry

7% 7%

19%

67%

0-5

5-10

10-20

20+

Introduction

Project Information

Floor System Analysis

Mechanical Analysis

Research

Conclusions

Page 24: Allegheny Township, PA · Size: Approx. 268,200 SF Cost Information: Lump Sum Cost - $39.7 million Project Delivery Method: Design-Bid-Build w/ Single Prime Contract Project Overview:

Kiski Area High SchoolAllegheny Township, PA

Sarah Haynes

Results:

Asked to rank their experience working with Contractors, 1 = Bad, 10 = Good

Suggested Improvements for Contractors:Perspective of Architectural Professionals

9910MAX.

252MIN.

776MEDIAN

6.76.96.3AVERAGE

OVERALLCONSTRUCTIONPRECONSTRUCTION

Introduction

Project Information

Floor System Analysis

Mechanical Analysis

Research

Conclusions

Page 25: Allegheny Township, PA · Size: Approx. 268,200 SF Cost Information: Lump Sum Cost - $39.7 million Project Delivery Method: Design-Bid-Build w/ Single Prime Contract Project Overview:

Kiski Area High SchoolAllegheny Township, PA

Sarah Haynes

Results:

Suggested Improvements for Contractors:Perspective of Architectural Professionals

POSITIVE DESCRIPTORS of EXPERIENCES with CONTRACTORS

Team Perspective

Helps Solve Problems

Good Craftsmanship

Good Project Management

Pride and Ownership

Introduction

Project Information

Floor System Analysis

Mechanical Analysis

Research

Conclusions

Page 26: Allegheny Township, PA · Size: Approx. 268,200 SF Cost Information: Lump Sum Cost - $39.7 million Project Delivery Method: Design-Bid-Build w/ Single Prime Contract Project Overview:

Kiski Area High SchoolAllegheny Township, PA

Sarah Haynes

Results:

Suggested Improvements for Contractors:Perspective of Architectural Professionals

NEGATIVE DESCRIPTORS of EXPERIENCES with CONTRACTORS

Introduction

Project Information

Floor System Analysis

Mechanical Analysis

Research

Conclusions

Not a Team Player

Lack of Scheduling Skills

Poor Quality Craftsmanship

Unfair Monetary CO’s

Create Adversarial Relationships

Page 27: Allegheny Township, PA · Size: Approx. 268,200 SF Cost Information: Lump Sum Cost - $39.7 million Project Delivery Method: Design-Bid-Build w/ Single Prime Contract Project Overview:

Typical Problems Encountered when Working with Contractors

0 5 10 15 20 25

Un-specified Materials

Lack of Communication

Profit Driven

Non-responsive

Defer Issues

Unappreciative of Design

Unethical

Act as Designers

Unavailable

Domineering

Type

s of

Pro

blem

s

Percentage of Responses

Kiski Area High SchoolAllegheny Township, PA

Sarah Haynes

Results:

Suggested Improvements for Contractors:Perspective of Architectural Professionals

LEED Bldg

Introduction

Project Information

Floor System Analysis

Mechanical Analysis

Research

Conclusions

Technology

PROFIT DRIVENCOMMUNICATION

UNSPECIFIED MATERIALS

Cheapen Project

Page 28: Allegheny Township, PA · Size: Approx. 268,200 SF Cost Information: Lump Sum Cost - $39.7 million Project Delivery Method: Design-Bid-Build w/ Single Prime Contract Project Overview:

Best Personal Traits

0

1

2

3

4

5

6

7

8

9

Communicative Personable Cooperative Knowledgeable Prompt Ethical Organized Leadership

Traits

Res

pons

es

Construction Project Manager

Individual in Field Supervision

Kiski Area High SchoolAllegheny Township, PA

Sarah Haynes

Results:

Suggested Improvements for Contractors:Perspective of Architectural Professionals

Introduction

Project Information

Floor System Analysis

Mechanical Analysis

Research

Conclusions

COMMUNICATIONKNOWLEDGEABLE

ETHICAL

COOPERATIVE

PERSONABLE

Page 29: Allegheny Township, PA · Size: Approx. 268,200 SF Cost Information: Lump Sum Cost - $39.7 million Project Delivery Method: Design-Bid-Build w/ Single Prime Contract Project Overview:

Best Personal Traits of a CONSTRUCTION PROJECT MANAGER

0

1

2

3

4

5

6

7

8

9

Communicative Personable Cooperative Knowledgeable Prompt Ethical Organized Leadership

Traits

Res

pons

es

Design-Builders Independent Designers

Kiski Area High SchoolAllegheny Township, PA

Sarah Haynes

Results:

Suggested Improvements for Contractors:Perspective of Architectural Professionals

Introduction

Project Information

Floor System Analysis

Mechanical Analysis

Research

Conclusions

COMMUNICATION ETHICAL

LEADERSHIPCOOPERATIVE

KNOWLEDGEABLE

Page 30: Allegheny Township, PA · Size: Approx. 268,200 SF Cost Information: Lump Sum Cost - $39.7 million Project Delivery Method: Design-Bid-Build w/ Single Prime Contract Project Overview:

Best Personal Traits of an Individual in FIELD SUPERVISION

0

1

2

3

4

5

6

7

8

9

Communicative Personable Cooperative Knowledgeable Prompt Ethical Organized Leadership

Traits

Res

pons

es

Design-Builders Independent Designers

Kiski Area High SchoolAllegheny Township, PA

Sarah Haynes

Results:

Suggested Improvements for Contractors:Perspective of Architectural Professionals

Introduction

Project Information

Floor System Analysis

Mechanical Analysis

Research

Conclusions

COMMUNICATION ETHICALLEADERSHIP

Page 31: Allegheny Township, PA · Size: Approx. 268,200 SF Cost Information: Lump Sum Cost - $39.7 million Project Delivery Method: Design-Bid-Build w/ Single Prime Contract Project Overview:

Kiski Area High SchoolAllegheny Township, PA

Sarah Haynes

Results:

Suggested Improvements for Contractors:Perspective of Architectural Professionals

BEST ATTRIBUTES of a CONSTRUCTION COMPANY

Introduction

Project Information

Floor System Analysis

Mechanical Analysis

Research

Conclusions

Open/Honest Communication

Ethical Responsibility

Client Focused/Works well with Owner

Works with Architect

Knowledgeable

Page 32: Allegheny Township, PA · Size: Approx. 268,200 SF Cost Information: Lump Sum Cost - $39.7 million Project Delivery Method: Design-Bid-Build w/ Single Prime Contract Project Overview:

Kiski Area High SchoolAllegheny Township, PA

Sarah Haynes

Results:

Suggested Improvements for Contractors:Perspective of Architectural Professionals

CRITICAL AREAS for CONTRACTOR IMPROVEMENT

Introduction

Project Information

Floor System Analysis

Mechanical Analysis

Research

Conclusions

Team Perspective

Open/Honest Communication

Scheduling

Problem Solving

Managing

Page 33: Allegheny Township, PA · Size: Approx. 268,200 SF Cost Information: Lump Sum Cost - $39.7 million Project Delivery Method: Design-Bid-Build w/ Single Prime Contract Project Overview:

Kiski Area High SchoolAllegheny Township, PA

Conclusions:

Team Perspective

Open/Honest Communication

Ethical Responsibility

Sarah Haynes

Suggested Improvements for Contractors:Perspective of Architectural Professionals

Introduction

Project Information

Floor System Analysis

Mechanical Analysis

Research

Conclusions

Page 34: Allegheny Township, PA · Size: Approx. 268,200 SF Cost Information: Lump Sum Cost - $39.7 million Project Delivery Method: Design-Bid-Build w/ Single Prime Contract Project Overview:

Kiski Area High SchoolAllegheny Township, PA

Conclusions:

Floor System Analysis

• Increased Schedule and Costs

Mechanical Analysis

• Decreased Energy Usage

Research

• Suggested Improvements for Contractors

Sarah Haynes

Introduction

Project Information

Floor System Analysis

Mechanical Analysis

Research

Conclusions

Conclusions

Page 35: Allegheny Township, PA · Size: Approx. 268,200 SF Cost Information: Lump Sum Cost - $39.7 million Project Delivery Method: Design-Bid-Build w/ Single Prime Contract Project Overview:

Acknowledgements

Kiski Area High SchoolAllegheny Township, PA

Kiski Area School District

Canzian / Johnston & Associates

P.J. Dick

AE Faculty

Sarah Haynes

Dr. Messner, Dr. Riley, and Dr. Horman

Dr. Hanagan and Dr. Ling

Friends and Classmates

Page 36: Allegheny Township, PA · Size: Approx. 268,200 SF Cost Information: Lump Sum Cost - $39.7 million Project Delivery Method: Design-Bid-Build w/ Single Prime Contract Project Overview:

Questions?

Kiski Area High SchoolAllegheny Township, PA

Sarah Haynes