12
All CMS 30 May07 TSV All CMS 3 30 May 2007 LHC machine CMS Progress Overall Schedule

All CMS 30 May07 TSV1 All CMS 3 30 May 2007 LHC machine CMS Progress Overall Schedule

Embed Size (px)

Citation preview

Page 1: All CMS 30 May07 TSV1 All CMS 3 30 May 2007 LHC machine CMS Progress Overall Schedule

All CMS 30 May07 TSV

1

All CMS 330 May 2007

LHC machineCMS ProgressOverall Schedule

Page 2: All CMS 30 May07 TSV1 All CMS 3 30 May 2007 LHC machine CMS Progress Overall Schedule

All CMS 30 May07 TSV

2

News on the Machine

Update on Triplets http://user.web.cern.ch/User/QuickLinks/Announcements/2007/LHCInnerTriplet_4.htmlFrom CERN Homepage and Fermilab Today.

Proposed to add to each Q1 magnet and each Q3 magnet a set of four cartridges that can absorb the longitudinal force generated during the pressure test. The solution was presented to a team of experts during a review at CERN on April 24 and 25. Since then the design of the cartridge system has been refined and parts needed for the cartridges and their installation have been ordered.

The installation of the cartridges in the Q1 and Q3 magnet of at least one inner triplet is scheduled to be complete in

early June, in time for the next pressure test.

DG, DDG and LHC Project Leader to meet soon. Most likely will be given information soon afterwards.

Page 3: All CMS 30 May07 TSV1 All CMS 3 30 May 2007 LHC machine CMS Progress Overall Schedule

All CMS 30 May07 TSV

3

CMS progressUX: 2 DT sectors in YB0 commissioned with cosmics. All 18 EB- SMs inserted, YB0 services installation ongoing (showing ~ 3 week

delay). Started installing tracker radial cable trays this week and start cabling of S1 towards the end of this week/beginning next week.

HF+ commissioned. Conducting a global run now

SX: YB-1 commissioned using cosmics (almost done), RE-2 chambers mounted - testing and commissioning. Cabling of YB-2 will finish soon. RPC HV cabling end-

June.

Tracker: Cosmics data being taken. Started process of going cold last week. Taking cosmics at 10C.

ECAL: EB- installed, 25 SMs integrated (electronics). 20 supercrystals mounted on ‘Dee4’. Over EE 2500 crystals delivered. Finalize schedule for final order (this week).

Page 4: All CMS 30 May07 TSV1 All CMS 3 30 May 2007 LHC machine CMS Progress Overall Schedule

All CMS 30 May07 TSV

4

SX: DT Commissioning YB-1

The Minus-end Muon Systems in SX5 being commissioned using

cosmics

Page 5: All CMS 30 May07 TSV1 All CMS 3 30 May 2007 LHC machine CMS Progress Overall Schedule

All CMS 30 May07 TSV

5

UX: DT Commissioning YB0

Sector 12

Page 6: All CMS 30 May07 TSV1 All CMS 3 30 May 2007 LHC machine CMS Progress Overall Schedule

All CMS 30 May07 TSV

6

HF+ in UX Commissioned

Bunch crossings, 1bx =25ns

Eta towers

Ph

i to

wer

s

Average response of towers to LED signals

Average LED event shape

HF+ connected to FEDs in USC

Page 7: All CMS 30 May07 TSV1 All CMS 3 30 May 2007 LHC machine CMS Progress Overall Schedule

All CMS 30 May07 TSV

7

EB- Installation Completed (22 May)

Page 8: All CMS 30 May07 TSV1 All CMS 3 30 May 2007 LHC machine CMS Progress Overall Schedule

All CMS 30 May07 TSV

8

Tracker “Chilling Out”

Thurs 24 May18:00

Page 9: All CMS 30 May07 TSV1 All CMS 3 30 May 2007 LHC machine CMS Progress Overall Schedule

All CMS 30 May07 TSV

9

All 20 Supercrystals mounted on “Dee4”

Page 10: All CMS 30 May07 TSV1 All CMS 3 30 May 2007 LHC machine CMS Progress Overall Schedule

All CMS 30 May07 TSV

10

YB0 Services Installation

Page 11: All CMS 30 May07 TSV1 All CMS 3 30 May 2007 LHC machine CMS Progress Overall Schedule

All CMS 30 May07 TSV

11

Overall CMS Schedule: v35.3

March

April

May

June

July

Aug.

Sep.

Oct.

Nov.

1) Detector Installation, Commissioning & Operation

First Global Readout Test

Barrel ECAL Inserted

Tracker InsertedTrigger/DAQ Ready for System

Commissioning

CMS Ready to Close

2) Preparation of Software, Computing and Physics Analysis

HLT exercise complete

Pre-CSA07 Computing Software Analysis Challenge

2007 Physics Analyses completed

CSA07

All CMS Systems Ready for Data Taking

Page 12: All CMS 30 May07 TSV1 All CMS 3 30 May 2007 LHC machine CMS Progress Overall Schedule

All CMS 30 May07 TSV

12

Points for DiscussionDiscuss new optimized CMS schedule during MB of 11 June

- also use for AR, CMS Week and CR (involve wide constituency)

Annual Reviews: 13-15 June, agenda sent out this morning.

CMS Week: 18-22 June, Plenary sessions in 2 parts. Under construction.

SLHC: need to prepare the next steps. Formulate a proposal by June MB ?

RPC_RE Workshop: 25, 26 June at CERN - invite all interested parties.

SLIMOS shifts - several incidents point to the need to start such shifts - will now actively canvas for volunteers (must not be solely people usually busy at Point 5 or on other critical path activities)

PublicationsConference CommitteeConstitutionMoA’s