Upload
eugene-alexander
View
215
Download
0
Tags:
Embed Size (px)
Citation preview
Alignment (results by Jo van den Brand)
Preparing IP 8
Velo arrived at IP 8
Preparing UXA C3
Installation transfer lines for the cooling system
Next steps
Frans Mul 31 May 2006
Drilling holes for th
e LV - boxes
Drilling holes for th
e LV - boxes
Drilling holes for the service platform
Drilling holes for the service platform
Preparing skates Preparing skates
Preparing IP 8
Preparing the false floor
Preparing the false floor
Frans Mul 31 May 2006
All pictures http://www.nikhef.nl/~fmul/velo/Velo_May 19, 2006, 3:25:56 PM/
Pushing the last meters Velo at IP8
Frans Mul 31 May 2006