21
Albrecht Wagner, Report from ICFA, ICHEP 2006 Report from ICFA 1. ICFA mission and membership 2. ICFA Panels 3. ICFA Activities 4. ILCSC and its mandate 5. Funding Agencies for LCs 6. Future activities of ICFA Albrecht Wagner, Chair ICFA ICHEP 2006 Moscow

Albrecht Wagner, Report from ICFA, ICHEP 2006 Report from ICFA 1.ICFA mission and membership 2.ICFA Panels 3.ICFA Activities 4.ILCSC and its mandate 5.Funding

Embed Size (px)

Citation preview

Page 1: Albrecht Wagner, Report from ICFA, ICHEP 2006 Report from ICFA 1.ICFA mission and membership 2.ICFA Panels 3.ICFA Activities 4.ILCSC and its mandate 5.Funding

Albrecht Wagner, Report from ICFA, ICHEP 2006

Report from ICFA

1. ICFA mission and membership

2. ICFA Panels

3. ICFA Activities

4. ILCSC and its mandate

5. Funding Agencies for LCs

6. Future activities of ICFA

Albrecht Wagner, Chair ICFA

ICHEP 2006 Moscow

Page 2: Albrecht Wagner, Report from ICFA, ICHEP 2006 Report from ICFA 1.ICFA mission and membership 2.ICFA Panels 3.ICFA Activities 4.ILCSC and its mandate 5.Funding

Albrecht Wagner, Report from ICFA, ICHEP 2006

ICFA Mission

Created in 1976 by the International Union of Pure and Applied Physics to facilitate international collaboration in the construction and use of accelerators for high energy physics. Its purposes, as stated in 1985:

– To promote international collaboration in all phases of the construction and exploitation of very high energy accelerators.

– To organize regularly world-inclusive meetings for the exchange of information on future plans for regional facilities and for the formulation of advice on joint studies and uses.

– To organize workshops for the study of problems related to super high-energy accelerator complexes and their international exploitation and to foster research and development of necessary technology.

Page 3: Albrecht Wagner, Report from ICFA, ICHEP 2006 Report from ICFA 1.ICFA mission and membership 2.ICFA Panels 3.ICFA Activities 4.ILCSC and its mandate 5.Funding

Albrecht Wagner, Report from ICFA, ICHEP 2006

Membership

The Committee has sixteen members, selected primarily from the regions most deeply involved in high energy physics.

CERN Member States: T Akesson, R Aymar, AWRussia: Y. Tikhonov, A ZaytsevChina: H ChenJapan: S Komamiya, A Suzuki4th Region: V Sahni, S Novaes, SC LeeUSA: S Dawson, J Dorfan, P OddoneCanada: D KarlenChair C11: G HertenGuest: R Petronzio (chair FALC)

Page 4: Albrecht Wagner, Report from ICFA, ICHEP 2006 Report from ICFA 1.ICFA mission and membership 2.ICFA Panels 3.ICFA Activities 4.ILCSC and its mandate 5.Funding

Albrecht Wagner, Report from ICFA, ICHEP 2006

• The newly styled ICFA Web page: http://www.fnal.gov/directorate/icfa/

• First on Google List, no longer surpassed by

• …ICFA, the international trade association for the cemetery, funeral, cremation and memorial industry

• …or: International Custody and Fund Administration

Web Page

Page 5: Albrecht Wagner, Report from ICFA, ICHEP 2006 Report from ICFA 1.ICFA mission and membership 2.ICFA Panels 3.ICFA Activities 4.ILCSC and its mandate 5.Funding

Albrecht Wagner, Report from ICFA, ICHEP 2006

ICFA Panels

• ICFA Instrumentation Innovation and Development Panel• ICFA Beam Dynamics Panel • ICFA Panel on Advanced and Novel Accelerators • ICFA Standing Committee on Interregional Connectivity • International Linear Collider Steering Committee • International High Energy Physics Computing Coordinati

on Committee

Page 6: Albrecht Wagner, Report from ICFA, ICHEP 2006 Report from ICFA 1.ICFA mission and membership 2.ICFA Panels 3.ICFA Activities 4.ILCSC and its mandate 5.Funding

Albrecht Wagner, Report from ICFA, ICHEP 2006

ICFA Activities

4 Meetings since last summer• 3 July 2005, Uppsala (during Lepton-Photon)• 29 September 2005, Daegu (during ICFA Seminar)• 9/10 February 2006, CERN (with lab directors invited)• 30 July 2006 Moscow

Main Focus:

Future of particle physics (Broad picture discussed at ICFA Seminar)

Guidance for the ILC with the help of ILCSC

Page 7: Albrecht Wagner, Report from ICFA, ICHEP 2006 Report from ICFA 1.ICFA mission and membership 2.ICFA Panels 3.ICFA Activities 4.ILCSC and its mandate 5.Funding

Albrecht Wagner, Report from ICFA, ICHEP 2006

ICFA and the Linear Collider

• ICFA has been helping guide international cooperation on the Linear Collider since the mid 1990’s.

• Reason: World-wide consensus that 500 GeV e+e- linear collider (upgradeable to ~1 TeV) is next major accelerator following LHC

1995: First ILC TRC Report, under Greg Loew as Chair

1999: ICFA Statement on Linear Collider

2002: ICFA commissioned the second ILC TRC Report, under Greg Loew as Chair

2002: ICFA establishes the International Linear Collider Steering Group (ILCSC) with Maury Tigner as Chair

Page 8: Albrecht Wagner, Report from ICFA, ICHEP 2006 Report from ICFA 1.ICFA mission and membership 2.ICFA Panels 3.ICFA Activities 4.ILCSC and its mandate 5.Funding

Albrecht Wagner, Report from ICFA, ICHEP 2006

ILC

• At ICHEP 2004 (Beijing) ICFA endorsed the Technology Recommendation made by the ITRP

• This led to a major convergence of world-wide efforts towards the LC

• GDE, with director Barry Barish, formed in early 2005• Baseline Configuration Document (BCD) produced in

late 2005; now under configuration control

Page 9: Albrecht Wagner, Report from ICFA, ICHEP 2006 Report from ICFA 1.ICFA mission and membership 2.ICFA Panels 3.ICFA Activities 4.ILCSC and its mandate 5.Funding

Albrecht Wagner, Report from ICFA, ICHEP 2006

ILC

• Early 2006: ILCSC set up a Machine Advisory Committee (MAC), chaired by Ferdinand Willeke (DESY)

• 1st MAC report April 2006• More detailed design (Reference Design Report) by end

of 2006. Will include costs (to accuracy of 20%)

• -> Much momentum has built up

Page 10: Albrecht Wagner, Report from ICFA, ICHEP 2006 Report from ICFA 1.ICFA mission and membership 2.ICFA Panels 3.ICFA Activities 4.ILCSC and its mandate 5.Funding

Albrecht Wagner, Report from ICFA, ICHEP 2006

ICFA FALC

FALC Resource Board

ILCSC

GDEDirectorate

GDEExecutive Committee

GlobalR&D Program

RDR Design Matrix

GDER & D Board

GDEChange Control Board

GDEDesign Cost Board

ILCDesignEffort

ILCR&D

Program

Page 11: Albrecht Wagner, Report from ICFA, ICHEP 2006 Report from ICFA 1.ICFA mission and membership 2.ICFA Panels 3.ICFA Activities 4.ILCSC and its mandate 5.Funding

Albrecht Wagner, Report from ICFA, ICHEP 2006

August September October November December

2005Snowmass

WW/GG summaries

Response to list of 40+ decisions

All documented ‘recommendations available on ILC Website (request community feedback)

Review by BCD ECBCD EC publishes‘strawman’ BCD

PublicReview Frascati

GDE meeting

BCD Executive Committee:BarishDugan, Foster, Takasaki Raubenheimer, Yokoya, Walker

From Snowmass to a Baseline

Page 12: Albrecht Wagner, Report from ICFA, ICHEP 2006 Report from ICFA 1.ICFA mission and membership 2.ICFA Panels 3.ICFA Activities 4.ILCSC and its mandate 5.Funding

Albrecht Wagner, Report from ICFA, ICHEP 2006

Jan July Dec 2006

Freeze ConfigurationOrganize for RDR

Bangalore

Review Design/Cost Methodology

Review InitialDesign / Cost Review Final

Design / CostRDR Document

Design and Costing PreliminaryRDR

Released

Frascati Vancouver Valencia

Baseline to a RDR

Page 13: Albrecht Wagner, Report from ICFA, ICHEP 2006 Report from ICFA 1.ICFA mission and membership 2.ICFA Panels 3.ICFA Activities 4.ILCSC and its mandate 5.Funding

Albrecht Wagner, Report from ICFA, ICHEP 2006

• Design Status and Plans– Plan to complete reference design / cost by the end of

2006– Technical design by end of 2009

• R & D Program– Support baseline: demonstrations; optimize cost /

performance; industrialization– Develop improvements to baseline – cavities; high power

RF• Overall Strategy

– Be ready for an informed decision by 2010

Final Remarks (B Barish)

Page 14: Albrecht Wagner, Report from ICFA, ICHEP 2006 Report from ICFA 1.ICFA mission and membership 2.ICFA Panels 3.ICFA Activities 4.ILCSC and its mandate 5.Funding

Albrecht Wagner, Report from ICFA, ICHEP 2006

New Mandate for ILCSC

• ILCSC mandate originally written in 2002. Many changes since.

• ICFA approved a revised mandate at its meeting in Moscow

• The ILCSC membership remains unchanged

• ILCSC has decided to reactivate the ‘Parameter Group’ as discussion partner for GDE

Page 15: Albrecht Wagner, Report from ICFA, ICHEP 2006 Report from ICFA 1.ICFA mission and membership 2.ICFA Panels 3.ICFA Activities 4.ILCSC and its mandate 5.Funding

Albrecht Wagner, Report from ICFA, ICHEP 2006

ILCSC Membership

• Directors of the major particle physics related laboratories in the three regions that provide core support to ILC (CERN, DESY, Fermilab, KEK, SLAC)

• One representative each from the three regional steering groups

• One representative each from the physics community of the three regions

• One representative from Russia• One representative from China• One ICFA representative from the “Other Countries”

category• Chairperson (Shin-ichi Kurokawa)

Page 16: Albrecht Wagner, Report from ICFA, ICHEP 2006 Report from ICFA 1.ICFA mission and membership 2.ICFA Panels 3.ICFA Activities 4.ILCSC and its mandate 5.Funding

Albrecht Wagner, Report from ICFA, ICHEP 2006

Recent Strategy Recommendations

• EPP2010– Revealing the Hidden Nature of Space and Time:

Charting the Course for Elementary Particle Physics

• CERN Council Strategy Group– Unanimous approval of European strategy

Both strongly support the full exploitation of LHC and give strong support to the International Linear Collider

Page 17: Albrecht Wagner, Report from ICFA, ICHEP 2006 Report from ICFA 1.ICFA mission and membership 2.ICFA Panels 3.ICFA Activities 4.ILCSC and its mandate 5.Funding

Albrecht Wagner, Report from ICFA, ICHEP 2006

FALC

• FALC = Funding Agencies for a Linear Collider• Informal group of particle physics funding agencies from

several countries• Subgroup: FALC Resources Group (FALC-RG)• Good coordination essential between FALC and ICFA• Links between FALC, ICFA and ILCSC through their

respective chairs

• FALC at its most recent meeting decided to extend its scope:

Page 18: Albrecht Wagner, Report from ICFA, ICHEP 2006 Report from ICFA 1.ICFA mission and membership 2.ICFA Panels 3.ICFA Activities 4.ILCSC and its mandate 5.Funding

Albrecht Wagner, Report from ICFA, ICHEP 2006

FALC Remit

• FALC agreed that to make progress towards a construction decision for a linear collider, it was necessary to consider the wider picture of particle physics research, understanding the priorities and constraints in each region.

• It was agreed that the remit of the Group should be broadened to include global coordination of, and information exchange on, the R&D programmes for upgrades of LHC, the present (ILC) and future (CLIC) linear colliders and the worldwide neutrino programme (such as proton driver, superbeam and neutrino factory).

• The Group agreed that although the acronym FALC should not be changed, it should be taken in future to represent ‘Funding Agencies for Large Colliders’.

Page 19: Albrecht Wagner, Report from ICFA, ICHEP 2006 Report from ICFA 1.ICFA mission and membership 2.ICFA Panels 3.ICFA Activities 4.ILCSC and its mandate 5.Funding

Albrecht Wagner, Report from ICFA, ICHEP 2006

Future Tasks of ICFA

Elements

• Non-accelerator physics becoming more important part of particle physics

• Field not so dominated by large accelerators as in the past

• Many major accelerators now are for neutron science, photon science, etc.

• Should ICFA change?• Road map for particle physics beyond ILC?

Page 20: Albrecht Wagner, Report from ICFA, ICHEP 2006 Report from ICFA 1.ICFA mission and membership 2.ICFA Panels 3.ICFA Activities 4.ILCSC and its mandate 5.Funding

Albrecht Wagner, Report from ICFA, ICHEP 2006

Future of ICFA

Result of discussion so far:

• ICFA should help when project become international• ICFA should not make comparisons between projects

• Discussion has been taken up again for several reasons:– EPP2010, European strategy are on the table– FALC has widened its scope and will require scientific

input. ICFA wishes to provide this input.

Page 21: Albrecht Wagner, Report from ICFA, ICHEP 2006 Report from ICFA 1.ICFA mission and membership 2.ICFA Panels 3.ICFA Activities 4.ILCSC and its mandate 5.Funding

Albrecht Wagner, Report from ICFA, ICHEP 2006

Conclusion

• ICFA has played a very active role for many years in helping advance international projects

• With LHC starting in 2007, a first major step will be taken to look beyond the Standard Model

• The results from LHC will be of vital importance for the field

• Major reviews have identified the ILC as ‘absolutely necessary’ for progress of particle physics

• Other programmes will become increasingly international• ICFA will continue helping advance the particle physics