ALASKA WATER + SEWER CHALLENGE Summit Consulting Services Prototype Update April 20, 2016

ALASKA WATER + SEWER CHALLENGEagnewbeck.com/pdf/wsc/summit-awwma.pdfALASKA WATER + SEWER CHALLENGE Summit Consulting Services Prototype Update April 20, 2016. Phase II Outreach & User

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: ALASKA WATER + SEWER CHALLENGEagnewbeck.com/pdf/wsc/summit-awwma.pdfALASKA WATER + SEWER CHALLENGE Summit Consulting Services Prototype Update April 20, 2016. Phase II Outreach & User

ALASKA WATER + SEWER CHALLENGESummit Consulting ServicesPrototype UpdateApril 20, 2016

Page 2: ALASKA WATER + SEWER CHALLENGEagnewbeck.com/pdf/wsc/summit-awwma.pdfALASKA WATER + SEWER CHALLENGE Summit Consulting Services Prototype Update April 20, 2016. Phase II Outreach & User

Phase II Outreach & User Input

2

Page 3: ALASKA WATER + SEWER CHALLENGEagnewbeck.com/pdf/wsc/summit-awwma.pdfALASKA WATER + SEWER CHALLENGE Summit Consulting Services Prototype Update April 20, 2016. Phase II Outreach & User

Phase III Outreach & User InputOur Website:http://summitwsc.com/FB @ Alaska Water and Sewer Challenge::Summit Team

3

Page 4: ALASKA WATER + SEWER CHALLENGEagnewbeck.com/pdf/wsc/summit-awwma.pdfALASKA WATER + SEWER CHALLENGE Summit Consulting Services Prototype Update April 20, 2016. Phase II Outreach & User

Phase II - System Configuration

4

Page 5: ALASKA WATER + SEWER CHALLENGEagnewbeck.com/pdf/wsc/summit-awwma.pdfALASKA WATER + SEWER CHALLENGE Summit Consulting Services Prototype Update April 20, 2016. Phase II Outreach & User

5

Page 6: ALASKA WATER + SEWER CHALLENGEagnewbeck.com/pdf/wsc/summit-awwma.pdfALASKA WATER + SEWER CHALLENGE Summit Consulting Services Prototype Update April 20, 2016. Phase II Outreach & User

Phase III – Potable Treatment

Reliable rejection of microorganisms and virusesMaterial: (PES)

6

Ultrafiltration MembraneMembrane area = 27 ft2

Flux Rate = ~53 GFDTreatment Rate = ~1 gpm

Page 7: ALASKA WATER + SEWER CHALLENGEagnewbeck.com/pdf/wsc/summit-awwma.pdfALASKA WATER + SEWER CHALLENGE Summit Consulting Services Prototype Update April 20, 2016. Phase II Outreach & User

Membrane Test Results

7

Page 8: ALASKA WATER + SEWER CHALLENGEagnewbeck.com/pdf/wsc/summit-awwma.pdfALASKA WATER + SEWER CHALLENGE Summit Consulting Services Prototype Update April 20, 2016. Phase II Outreach & User

Graywater Treatment Options

8

Page 9: ALASKA WATER + SEWER CHALLENGEagnewbeck.com/pdf/wsc/summit-awwma.pdfALASKA WATER + SEWER CHALLENGE Summit Consulting Services Prototype Update April 20, 2016. Phase II Outreach & User

Graywater/Hygiene Specification

(Delete after review)

9

Measure

Single Sample

Maximum Test Average

NSF-350 Single

Sample MaxNSF-350 Test

AverageBOD5 (mg/L) 25 10 25 10

Total Suspended Solids (mg/L)

30 10 30 10

Turbidity 10 5 10 5

Total Coliform Non-detectable

Non-detectable N/A N/A

E. coli (MPN/100 N/A N/A 240 14

pH N/A 6.0 – 9.0 N/A 6.0 – 9.0

Color N/A Measured and reported N/A Measured and

reported

Odor N/A Non-offensive N/A Non-offensive

Oily film and foam

Non-detectable

Non-detectable

Non-detectable

Non-detectable

Page 10: ALASKA WATER + SEWER CHALLENGEagnewbeck.com/pdf/wsc/summit-awwma.pdfALASKA WATER + SEWER CHALLENGE Summit Consulting Services Prototype Update April 20, 2016. Phase II Outreach & User

Graywater Treatment Systems

Prefiltration

Aeration

Fixed Media for biological filtration

or

Membranes

Disinfection with UV light

Common Features

10

Page 11: ALASKA WATER + SEWER CHALLENGEagnewbeck.com/pdf/wsc/summit-awwma.pdfALASKA WATER + SEWER CHALLENGE Summit Consulting Services Prototype Update April 20, 2016. Phase II Outreach & User

Aqua2use – GWTS500

11

Page 12: ALASKA WATER + SEWER CHALLENGEagnewbeck.com/pdf/wsc/summit-awwma.pdfALASKA WATER + SEWER CHALLENGE Summit Consulting Services Prototype Update April 20, 2016. Phase II Outreach & User

Aqualoop

12

Page 13: ALASKA WATER + SEWER CHALLENGEagnewbeck.com/pdf/wsc/summit-awwma.pdfALASKA WATER + SEWER CHALLENGE Summit Consulting Services Prototype Update April 20, 2016. Phase II Outreach & User

UVOX 20

13

Page 14: ALASKA WATER + SEWER CHALLENGEagnewbeck.com/pdf/wsc/summit-awwma.pdfALASKA WATER + SEWER CHALLENGE Summit Consulting Services Prototype Update April 20, 2016. Phase II Outreach & User

Tank Freeze TestProtocol:• Fill the tank to 7/8 full.• Freeze to 0° F.• Duration of 48 hours or until frozen solid.• Thaw completely.• Observe for cracking and tank stress• Repeat freezing for 48 hours• Thaw again

14

Page 15: ALASKA WATER + SEWER CHALLENGEagnewbeck.com/pdf/wsc/summit-awwma.pdfALASKA WATER + SEWER CHALLENGE Summit Consulting Services Prototype Update April 20, 2016. Phase II Outreach & User

Tank Pressure Test

15

Page 16: ALASKA WATER + SEWER CHALLENGEagnewbeck.com/pdf/wsc/summit-awwma.pdfALASKA WATER + SEWER CHALLENGE Summit Consulting Services Prototype Update April 20, 2016. Phase II Outreach & User

Parke [email protected]: (907) 291-2339

Tok OfficeHC 72 Box 850Tok, AK 99780

Anchorage Office4500 Business Park Blvd, Ste. C-10Anchorage, AK 99503

Fairbanks Office3745 Geist Road, Suite BFairbanks, AK 99709