Akjh d Bms Specification

Embed Size (px)

Citation preview

  • 8/18/2019 Akjh d Bms Specification

    1/35

    AKH COMMERCIAL TOWER

    Plot No.47/Sector 1/74-Al Kashlaa, Dahran/Dammam/K.S.A

    Tender Volume 3, Part-E

    SECTION 25 00 00

    BUILDING MANAGEMENT AND CONTROL SYSTEM

    Revision History

    00 June 2013 Issue to Tender IBA TM HM

    Rev. Date Description of Revision Prepared By Checked By Approved By

  • 8/18/2019 Akjh d Bms Specification

    2/35

    AKH COMMERCIAL TOWER

    Plot No.47/Sector 1/74-Al Kashlaa, Dahran/Dammam/K.S.A

    Tender Volume 3, Part-E

    Section 25 00 00: BMS and Control System Page 2 of 35 Rev.00 – June 2013

    Tender Documents

    SECTION 25 00 00

    BUILDING MANAGEMENT AND CONTROL SYSTEM

    INDEX

    1.0  GENERAL............................................................ ..................................................................... .............. 3 

    1.1 REFERENCE....................................................................................... ....................................... 3

    1.2 SYSTEM DESCRIPTION.......................................................... ................................................ 3

    1.3 QUALITY ASSURANCE ........................................................ .................................................. 8

    1.4 ACCEPTABLE BID PROCEDURES .......................................................... .............................. 9

    1.5 SUBMITTALS .................................................................. ....................................................... 11

    1.6 DELIVERY, STORAGE AND HANDLING:................................................... ....................... 111.7 MANUALS............................................................................. .................................................. 11

    1.8 TRAINING............................................................... ............................................................ .... 12

    1.9 WARRANTY ...................................................... .................................................................. ... 13

    2.0  PRODUCTS........................................ ............................................................... .................................... 13 

    2.1 BMCS CENTRAL HARDWARE ....................................................... ..................................... 13

    2.2 PORTABLE OPERATORS TERMINALS............................................................... ............... 14

    2.3 REMOTE HVAC CONTROLLER  HARDWARE .............................................................. ..... 16

    2.4 HVAC DATA COMMUNICATIONS...................................................................................... 17

    2.5 ELECTRICAL AND MECHANICAL CONTROL DEVICES................................................ 17

    2.6 ELECTRONIC DATA INPUTS AND OUTPUTS........................................... ........................ 19

    2.7 OPERATOR  STATION SOFTWARE............................................................... ...................... 20

    2.8 REMOTE PANEL SOFTWARE............................................................. ................................. 26

    2.9 PROTECTION OF SOFTWARE RIGHTS ................................................................ .............. 28

    2.10 DATA CONTROL (D/C) AND GRAPHICS SUMMARY ...................................................... 28

    2.11 BMCS - POINTS LIST.......................................................................... ................................... 29

    3.0  EXECUTION................................................................................. ........................................................ 29 

    3.1 EXAMINATION...................................................... ............................................................. ... 34

    3.2 INSTALLATION ............................................................... ...................................................... 34

    3.3 LOCATION AND INSTALLATION OF COMPONENTS ..................................................... 35

    3.4 INTERLOCKING AND CONTROL WIRING.......................................................... .............. 35

  • 8/18/2019 Akjh d Bms Specification

    3/35

    AKH COMMERCIAL TOWER

    Plot No.47/Sector 1/74-Al Kashlaa, Dahran/Dammam/K.S.A

    Tender Volume 3, Part-E

    Section 25 00 00: BMS and Control System Page 3 of 35 Rev.00 – June 2013

    Tender Documents

    PART 1 - GENERAL

    1.1 REFERENCE

    1.1.1 Conform to General Requirements for Electrical Services of 26 01 00.

    1.1.2 Related Work Specified Elsewhere

    Analogue Addressable Fire Alarm System

    Emergency Lighting

    Lighting Control System

    Public Address and Music System

    Chilled Water Pumps

    Fire Fighting Pumps

    Plumbing Pumps

    Air Cooled Packaged Chillers

    Air Handling Units

    Unitary Air Conditioning Equipment

    Fan Coil Units

    Fans

    1.2 SYSTEM DESCRIPTION

    1.2.1 Provide a state of the art standalone Building Management and Control System (BMCS) for the

     building incorporating Direct Digital Control (DDC), Equipment Monitoring and Control, consisting

    of the following elements:

    a)  Microcomputer based remote control panels interfacing directly with sensors, actuators

    and environmental delivery systems (i.e., HVAC equipment, lighting systems, etc.). The

    BMCS shall interface with the chiller PSC (Programmable supervisory controller).

     b)  Two-wire communication networks to allow data exchange between remote panels and

     between remote panels and the central Building Management computer.

    c) 

    One personal computer (PC) based central and associated operator station(s) andsoftware functioning as the primary operator interface for the BMCS.

    d)  Electronic and electric controls for all items indicated on drawings and described

    hereinafter including sensors, control valves and thyristers.

    1.2.2 Submittals, data entry and electrical installation, programming, interfacing with other systems, start

    up, test and validation, instruction of Employer's representative on maintenance and operation, as

     built documentation, and system warranty.

    1.2.3 Building Management System

    The Integrated Building Management System shall consist of three levels as follows:

    a)  Field Level: consists of field sensors, volt-free contacts and intelligent standalone DDC

    controllers. All the operation associated with particular equipment shall be achieved in

    this level itself without intervention of any higher network devices.

  • 8/18/2019 Akjh d Bms Specification

    4/35

    AKH COMMERCIAL TOWER

    Plot No.47/Sector 1/74-Al Kashlaa, Dahran/Dammam/K.S.A

    Tender Volume 3, Part-E

    Section 25 00 00: BMS and Control System Page 4 of 35 Rev.00 – June 2013

    Tender Documents

     b)  Building Automation Level: consists of system controller shall be capable of handling

    and storing the Building Automation functions like Trend, History, Totalization, Alarm

    Routing, Co-ordination with field devices for alarms or any information, optimum

    start/stop etc.

    c)  Information Management Level: consists of person machine interface like Operator

    Workstations, Graphics User Interface, Information Management to format in user

     preferred way, open protocol availability for ActiveX, ODBC, OLE for Process Control

    (OPC), COM/DCOM, Network Integrators etc.

    1.2.4 System Architecture

    a) First Layer Network

    The first layer network shall be based on a PC industry standard of Ethernet TCP/IP. PC

    Workstation LAN controller cards shall be standard “off the shelf” products availablethrough normal PC vendor channels.

    The BMCS shall network multiple operator workstations, network controllers and

    system controllers. The first layer network shall provide communications between

    operator workstations and first layer DDC (Direct Digital Control) controllers.

    The first layer network shall operate at a minimum communication speed of 10 M baud,

    with full peer-to-peer network communication.

     Network Controllers and Operator Workstations shall reside on the first layer. All

     Network Controllers and Operator Workstations should be directly connected to TCP/IP

    network at 10 M baud.

    The first layer network will be compatible with other facility-wide networks. The first

    layer shall be connected to a facility network by way of standard networking practices.

    The structured cabling and IT infrastructure network shall be used as an actual first layer

    network. All the network controllers and Operator Workstations shall directly reside on

    the first layer network.

     b)  Second Layer Network

    DDC System Controllers shall reside on the second layer.

    Other Application Specific Controller (e.g. Fan Coil Unit Controller, VAV Controlleretc) shall reside on the second layer.

    Devices like 3rd party integrators (e.g. Chiller Integrators), Energy Monitoring Units

    shall also reside on the second layer network.

    All the controllers mentioned above shall be able to communicate on single

    communication bus (i.e. one second layer network). Various buses for various types of

    controllers at various communication speeds will not be acceptable.

    The second layer network shall operate at a minimum communication speed of 9600

     baud.

    1.2.5 Protocol Compatibility for Integration

    In general the BMCS system shall have an Integration facility with third party equipment/

  • 8/18/2019 Akjh d Bms Specification

    5/35

    AKH COMMERCIAL TOWER

    Plot No.47/Sector 1/74-Al Kashlaa, Dahran/Dammam/K.S.A

    Tender Volume 3, Part-E

    Section 25 00 00: BMS and Control System Page 5 of 35 Rev.00 – June 2013

    Tender Documents

    systems via following methods:

    Direct Protocol (Integrator Panel):

    a) The BMCS system shall include appropriate hardware equipment and software to allow bi-directional data communications between the BMCS system and 3rd   party

    manufacturers’ control panels. The BMCS shall receive, react to, and return information

    from multiple building systems, including but not limited to the chillers, variable

    frequency drives and power monitoring and control system.

     b) All data required by the application shall be mapped into the Network Controller’s

    database, and shall be transparent to the operator.

    c) Point inputs and outputs from the third-party controllers shall have real-time

    interoperability with BMCS software features such as: Control Software, Energy

    Management, Custom Process Programming, Alarm Management, Historical Data and

    Trend Analysis, Totalization, and Dial-Up and Local Area Network Communications.

    d) The Building Management System shall provide any combination of third-party

    controllers on a single network. A minimum of 100 third-party controllers shall be

    supported on a single network. Integration shall be via RS-232 or RS-485 technologies.

    e) The system operator shall have the ability to verify, and diagnose communication

    messages and point information between third-party controllers and the BMCS. All these

    integrators shall reside on the field communication bus i.e. second layer network.

    Protocol Integration

    a) The protocol used between systems will be BACnet over Ethernet and comply with theASHRAE BACnet standard 135-1995 or Echelon Lontalk.

     b) The BACnet System Integrator (BSI) will allow bi-directional communications between

    the host system and a BACnet system over an Ethernet data link. Supported media shall

    include fibre, 10base2, and 10baseT.

    c) A complete Protocol Implementation Conformance Statement (PICS) shall be provided

    for the Integrator and all BACnet system devices.

    d) The BSI shall conform to BACnet conformance class 4, and provide the ability to

    monitor and control BACnet system points from the host system and host system points

    from the BACnet system.

    e) The ability to share data and change of state (COS) between the host and BACnet

    systems shall be provided.

    Employer-Server (OPC)

    a) The neutral protocol used between the BMCS and diverse systems will be the Industry

    Standard protocol OLE for Process Control (OPC) over Ethernet.

     b) OPC shall link the BMCS with one or more systems via OPC Servers, providing an

    industry-standard, component-based interface to BMCS data.

    c) The OPC Server shall have the following characteristics and functionality:

    Run on Windows 95, Windows 98, Windows 2000 and Windows NT machines

  • 8/18/2019 Akjh d Bms Specification

    6/35

    AKH COMMERCIAL TOWER

    Plot No.47/Sector 1/74-Al Kashlaa, Dahran/Dammam/K.S.A

    Tender Volume 3, Part-E

    Section 25 00 00: BMS and Control System Page 6 of 35 Rev.00 – June 2013

    Tender Documents

    connected via Ethernet to the BMCS.

    Allow generic components to be used and shared with other OPC-compliant Employers

    and systems.

    Serve as the “translation service” for the various languages used by the diverse systems

    with which it communicates.

    Support multiple OPC Employers running on both local and remote machines in the

    network.

    Control the interaction and communication between workstation applications (on

    Employers) and the BMCS by providing standard methods for sharing and exchanging

    data between the BMCS and other systems.

    Provide interfaces for browsing, reading, and writing accessibility.

    OPC shall connect the BMCS to multiple systems concurrently, without requiring

    modification of the existing BMCS architecture.

    OPC shall seamlessly integrate diverse proprietary components and systems, and shall

     provide the capability to add and integrate other components.

    The OPC software shall translate data from multiple systems into one user interface. The

    software shall allow an operator to monitor and control data, communication, and

    systems through an OPC Employer (workstation).

    The ability to share data and change of state (COS) between the BMCS network and the

    integrated systems shall be provided via the OPC interface.

    d) Integration/BMCS Specific Requirements

    The purpose of integration is to ensure that all the low voltage systems work in co-

    ordination with each other as single system. The integration is not limited only to

    monitor/control of the 3rd 

     party systems from BMCS. The whole low voltage package

    shall work as a one complete system under the umbrella of BMCS.

    e) Open Systems Integration

    Chiller Integrator Interface:

    i.  The BMCS system shall include appropriate hardware equipment and software

    to allow two way data communications between the BMCS system and the

    chiller manufacturer’s chiller control panel.

    ii.  It shall be the responsibility of the BMCS Contractor to co-ordinate with the

    chiller manufacturer to provide a functional data communications connection.

    iii.  All data supported by the chiller communication protocol shall be mapped into

    the supervisory DDC controller’s database and shall be displayed on a chiller

    data screen at the Operator Workstation and shall be transparent to the operator.

    iv.  The BMCS Contractor shall furnish either the OSP or BACnet communications

    interface as required by the chiller manufacturer.

  • 8/18/2019 Akjh d Bms Specification

    7/35

    AKH COMMERCIAL TOWER

    Plot No.47/Sector 1/74-Al Kashlaa, Dahran/Dammam/K.S.A

    Tender Volume 3, Part-E

    Section 25 00 00: BMS and Control System Page 7 of 35 Rev.00 – June 2013

    Tender Documents

    v.  The chiller manufacturer shall provide all hardware for connection of the

    manufacturer’s processor to BMCS.

    f) VFD Integrator Interface

    The BMCS system shall include appropriate hardware equipment and software to allow

    two way data communications between the BMCS system and the VFD manufacturers

    control panel.

    It shall be the responsibility of the BMCS Contractor to co-ordinate with the VFD

    manufacturer to provide a functional data communications connection.

    All data supported by the VFD communication protocol shall be mapped into the

    supervisory DDC controller’s database and shall be displayed on data screens at the

    Operator Workstation and shall be transparent to the operator.

    The BMCS Contractor shall furnish either the OSP or BACnet communications interface

    as required by the VFD manufacturer.

    The VFD manufacturer shall provide all hardware for connection of the manufacturer’s

     processor to BMCS.

    g) Fire Alarm Integration

    The BMCS system shall include appropriate hardware equipment and software to the

    communications between the BMCS system and the Fire Alarm panels.

    It shall be the responsibility of the BMCS Contractor to co-ordinate with the Fire Alarmvendor to provide a functional data communications connection.

    All data supported by the Fire Alarm Panel shall be mapped into the Network Controller

    Database and shall be displayed on floor-wise at the BMCS Operator Workstation and

    shall be transparent to the operator.

    The BMCS system shall be able to integrate with Digital Public Address System to

    announce the fire conditions.

    The BMCS Contractor shall furnish either the OSP or BACnet communications interface

    as required by the Fire Alarm panel.

    h) Security System Integration (Access Control System & CCTV System)

    The BMCS system shall include appropriate hardware equipment and software to the

    communications between the BMCS system and the Security system provided by others.

    All data in security system (only alarms for CCTV) shall be mapped into the Network

    Controller Database and shall be displayed at the BMCS Operator Workstation and shall

     be transparent to the operator.

    The BMCS Contractor shall furnish either the OSP or BACnet or DDE communications

    interface as required by the Security System.

    The BMCS system supplier shall provide necessary hardware for connection between

    the BMCS and security system.

  • 8/18/2019 Akjh d Bms Specification

    8/35

    AKH COMMERCIAL TOWER

    Plot No.47/Sector 1/74-Al Kashlaa, Dahran/Dammam/K.S.A

    Tender Volume 3, Part-E

    Section 25 00 00: BMS and Control System Page 8 of 35 Rev.00 – June 2013

    Tender Documents

    Intelligent Lighting Control System Integration

    It shall be a responsibility of the BMCS supplier to provide appropriate hardware

    equipment and software to the communications between the BMCS system and theLighting system

    All data supported by the Lighting Control System shall be mapped into the Network

    Controller Database and shall be displayed on floor-wise at the BMCS Operator

    Workstation and shall be transparent to the operator.

    The BMCS Contractor shall furnish either the EIB or OSP or BACnet or LonMark

    communications interface as required by the Lighting Control System.

    k) Any Other Integration (if required & specified elsewhere in the specifications)

    The BMCS system keeps provision for integration with other systems like UPS, StandbyGenerators Emergency Lighting Systems as required in their proposal. The systems,

    which are not part of ELV scope of supply and required to be integrated, all necessary

     provision shall be made by MEP contractor as mentioned in the General Conditions of

    this document. These integrations shall be carried out using the standard integration

    methods mentioned elsewhere in the specifications.

    1.3 QUALITY ASSURANCE

    1.3.1 Bids by Wholesalers, Contractors, Franchised Dealers or any firm whose principal business is not

    that of manufacturing and installing automatic temperature control, lighting control, fire alarm,

    security, and access control systems shall not be acceptable.

    1.3.2 The system shall be installed by competent mechanics, regularly employed by the BMCS

    manufacturer with full responsibility for proper operation of the BMCS including debugging and

     proper calibration of each component in the entire system. Supplier shall have an in-place support

    facility within Abu Dhabi Emirate with technical staff, spare parts inventory and all necessary test

    and diagnostic equipment.

    1.3.3 Codes and Approvals:

    The complete BMCS installation shall be in strict accordance to the national and local electrical

    codes and the electrical section of these specifications. All devices designed for or used in line

    voltage applications shall be UL Listed or approved by an equal regulatory authority.

    All microprocessor based remote DDC devices shall be UL916 Listed or approved by an equal

    regulatory authority.

    All microprocessor based remote Field & Supervisory devices shall be UL864 Listed or approved by

    an equal regulatory authority.

    All BMCS central equipment shall be UL864 Listed or approved by an equal regulatory authority.

    All BMCS central and remote equipment used in security applications shall be UL1076 Listed or

    approved by an equal regulatory authority.

    All BMCS central and remote equipment used in access control applications shall be UL294 Listed

    or approved by an equal regulatory authority.

    All electrical environmental control and monitoring devices shall be UL429 and/or UL873 Listed or

    approved by an equal regulatory authority.

  • 8/18/2019 Akjh d Bms Specification

    9/35

    AKH COMMERCIAL TOWER

    Plot No.47/Sector 1/74-Al Kashlaa, Dahran/Dammam/K.S.A

    Tender Volume 3, Part-E

    Section 25 00 00: BMS and Control System Page 9 of 35 Rev.00 – June 2013

    Tender Documents

    1.3.4 All electronic equipment shall conform to the requirements of FCC regulation Part 15, Section 15

    governing radio frequency electromagnetic interference and be so labelled.

    1.3.5 System shall be designed to provide satisfactory operation without damage at 110% and 85% of

    rated voltage and at + 3 hertz variation in line frequency.

    1.3.6 System shall be designed to provide static, transient, and short circuit protection on all inputs and

    outputs. Communication lines shall be protected against incorrect wiring, static transients and

    induced magnetic interference. Bus connected devices shall be a.c. coupled or equivalent so that any

    single device failure will not disrupt or halt bus communication.

    1.3.7 All real time clocks shall be battery backed for a minimum period of 365 days.

    1.3.8 Plant Control Processors shall comply with ISO 9000..

    1.4 ACCEPTABLE BID PROCEDURES

    1.4.1 Technical Proposal: It is the intent of this specification to define a state-of-the-art distributed

    computerized software Integrated Building Management and Control System which is user friendly,

    has known reliability, is extremely responsive, and which is to be designed, installed, implemented,

    and supported by a local office of the manufacturer by people skilled in providing functional and

    efficient solutions to building system needs.

    To allow evaluation of vendors and systems, a detailed technical proposal shall be provided and

    formatted strictly in accordance to this outline. Vendors standard literature not complying to this

    format and content requirement will not be considered or evaluated. Proposal requirements shall be

    as follow:

    Proposed system complete with location and block diagram including central computer type andmemory, peripherals, communication interfaces, all LAN cards, all active hubs and repeaters,

    network layout, distributed peer bus connected control/monitor panels with location, listing of

    equipment directly connected to a DDC controller, and secondary network drivers and connected

    systems.

    Provide copies of required UL listing cards.

    1.4.2 Compliance Checklist - Provide a specification paragraph-by-paragraph listing of strict word-for-

    word compliance or non-compliance. For each item of conditional or non-compliance, spell out the

    vendor's substitute response to the feature excepted.

    Example:

    Paragraph ComplyConditional

    Comply

     Non-

    Comply

    Justification for Non-

    Comply

    2.08 a Full Compliance X

    2.08 b Full Compliance X

    2.08 c Covers are polished X

    1.4.3 Computer based central controller features

    a) Day-to-day interactive operator interface description with sample English/Graphic displays,

     penetration scheme for display/command and logical configuring, and examples of alarms

    and data in various modes (disabled, fixed, not responding, etc.)

     b) Short cut penetration schemes for direct graphic, point, and command access

    c) Colorgraphic system description with sample system displays, colorgraphic penetration and

  • 8/18/2019 Akjh d Bms Specification

    10/35

    AKH COMMERCIAL TOWER

    Plot No.47/Sector 1/74-Al Kashlaa, Dahran/Dammam/K.S.A

    Tender Volume 3, Part-E

    Section 25 00 00: BMS and Control System Page 10 of 35 Rev.00 – June 2013

    Tender Documents

    command schemes, graphic creation means, library of symbols, and curve plot

    d) Interactive data editing scheme for modification of system data base and parameters

    including operators, peripheral assignments, system configuration, text, time schedules,

     point monitoring limits, event-initiated control, and control application program parameters

    e) Electronic mail/messaging description and samples

    f) Data access control and security scheme

    g) Report descriptions including selection scheme and sample reports for setting up and

    displaying extended trend file reports.

    h) Sample sequence of operation and specified flow chart display

     j) Sample custom report

    k) Sample text alarm message

    l) Sample of system and point descriptor text

    m) Technical description of all hardware components

    n) Sample alarm report

    o) Sample alarm acknowledgement report

     p) Sample text terminal menu display

    1.4.4 Distributed control panel point architecture, memory, real time clock.

    a)  Functional description

     b)  Scan/Report speed and alarm detection speed

    c)  Control and survival capabilities

    d)  Life safety interfacing

    1.4.5 Communications network architecture, points, panels

    a) Protocol description, host independent, bus-cut reaction

     b) Bus limitations, distances between active links and hubs, etc.

    c) Number of devices on bus without repeater.

    d) Error checking, collision prevention, recovery

    e) Controller internal architecture, communication cards, board-to-board communications,

    secondary bus drivers.

    f) Point sharing/update scheme

    g) Meantime end-to-end responsiveness for a large fully operational system for analog alarm

    report, digital alarm report, panel failure report, host command execution, event command(within one panel and panel-to-panel)

    1.4.6 Available services for full system maintenance, software update and modifications, hardware spare

     parts, adds and changes, system training and training classes

  • 8/18/2019 Akjh d Bms Specification

    11/35

    AKH COMMERCIAL TOWER

    Plot No.47/Sector 1/74-Al Kashlaa, Dahran/Dammam/K.S.A

    Tender Volume 3, Part-E

    Section 25 00 00: BMS and Control System Page 11 of 35 Rev.00 – June 2013

    Tender Documents

    1.4.7 Contractor experience/capability, size

    a) Organization with brief resumes for key personnel.

     b) 15 years history of local support of management, Engineering, installation, and

    maintenance locations and business

    c) Local experience on similar jobs with references

    d) Local facility description

    1.4.8 Vendor’s standard specification data literature.

    1.5 SUBMITTALS

    1.5.1 Product Data : Submit manufacturer’s technical product data for each control device furnishedshowing dimensions, weights, capacities, performance characteristics, electrical characteristics,

    finishes of materials, installation instruction and startup instruction.

    1.5.2 Shop Drawings : Submit shop drawings for each electrical control system, containing the

    following information:

    a)  Schematic flow diagram of system showing fans, pumps, coils, dampers, valves, and

    control devices.

     b)  Label each control device with setting or adjustable range of control.

    c)  Indicate all required electrical wiring. Clearly differentiate between portions of wiring

    that are factory installed and portions to be field installed.

    d)  Provide details of fascia of control panels, including controls, instruments, and labeling.

    e)  Include written description of sequence of operation.

    f)  Include a complete list of components for each proposed panel.

    1.5.3 Submit catalogues for all controls and accessories and the recommended spare parts for 2 years

    operation and maintenance.

    1.5.4 Maintenance Data: Submit maintenance instructions and spare parts lists, include this data,

     product data, and shop drawings in maintenance manuals.

    1.6 DELIVERY, STORAGE AND HANDLING:

    Provide factory shipping cartons for each piece of equipment, and control device. Maintain

    cartons through shipping, storage and handling as required to prevent equipment damage, and to

    eliminate dirt and moisture from equipment. Store equipment and materials inside and protected

    from weather.

    1.7 MANUALS

    1.7.1 The following manuals shall be provided:

    a) 

    An Operators Manual with coloured graphic explanations of operator functions. Although

    operator functions are to be self-instructional and menu-interactive from the keyboard

    terminal, this manual shall be for off-line study and refresher use.

  • 8/18/2019 Akjh d Bms Specification

    12/35

    AKH COMMERCIAL TOWER

    Plot No.47/Sector 1/74-Al Kashlaa, Dahran/Dammam/K.S.A

    Tender Volume 3, Part-E

    Section 25 00 00: BMS and Control System Page 12 of 35 Rev.00 – June 2013

    Tender Documents

     b)  Computerized printouts of all PCP (Plant Control Processor) data file construction

    including all point processing assignments, physical terminal relationships, flowcharts of

    graphic program. etc.

    c) 

    A user manual for the integrated spreadsheet package.

    d)  A manual including revised As Built documents of all shop drawings and materials as

    required under the paragraph "SUBMITTALS" on this specification.

    e)  Operators Manuals and As Built Manuals shall be provided to the Employer.

    1.8 TRAINING

    1.8.1 All training shall be by the BMCS manufacturer and shall utilize specified manuals, as-built

    documentation, and the on-line help utility. The following training shall be repeated quarterly

    during the warranty period.

    1.8.2 Operator training shall include two initial six-hour sessions encompassing:

    a)  Sequence of Operation review.

     b)  Sign on-Sign off.

    c)  Selection of all displays and reports.

    d)  Commanding of points, keyboard and mouse mode.

    e)  Modifying English text.

    f)  Use of all dialogue boxes and menus.

    g)  Modifying alarm limits and start-stop times.

    h)  System initialization.

    i)  Download and initialization of remote panels.

     j)  Purge and/or dump of historical data.

    k) 

    Use of Portable Operators Terminals.l)  Troubleshooting of sensors (determining bad sensors).

    m)  Password modification.

    n)  Creation and modification of cardholder database.

    1.8.3 Supervisor training shall include an additional two hour session encompassing:

    a)  Password assignment/modification.

     b)  Operator assignment/modification.

    c)  Operator authority assignment/modification.

    d)  Point disable/enable.

    e)  Terminal and data segregation/modification.

    f)  Use of portable operator terminal.

    g) 

    Use of spreadsheet package with system data.

    h)  Creation and modification of site-specific user-defined cardholder fields.

    1.8.4 Programmer training shall include two additional three hour sessions encompassing:

    a)  Software review of Sequence of Operation and flowcharts.

     b)  Use of diagnostics.

    c)  System maintenance procedures.

    d)  Review of initialization.

    e)  Upload/download and off-line archiving of PCP (Plant control Processor) and PC system

    software.

    f)  Graphic creation.

  • 8/18/2019 Akjh d Bms Specification

    13/35

    AKH COMMERCIAL TOWER

    Plot No.47/Sector 1/74-Al Kashlaa, Dahran/Dammam/K.S.A

    Tender Volume 3, Part-E

    Section 25 00 00: BMS and Control System Page 13 of 35 Rev.00 – June 2013

    Tender Documents

    g)  Programmer training shall be for two Employer personnel and shall be scheduled by the

    Employer with two week notice anytime during the warranty period.

    1.9 WARRANTY

    1.9.1 All components, system software, parts and assemblies supplied by the BMCS manufacturer shall be

    guaranteed against defects in materials and workmanship for one year from provisional acceptance

    date.

    1.9.2 Labor to troubleshoot, repair, reprogram, or replace system components shall be furnished by the

    BMCS contractor at no charge to the ENGINEER during the warranty period.

    1.9.3 All corrective software modifications made during warranty service periods shall be updated on all

    user documentation and on user and manufacturer archived software disks at no charge to

    ENGINEER .

    PART 2 - PRODUCTS

    2.1 BMCS CENTRAL HARDWARE

    2.1.1 The BMCS Contractor shall provide and install a personal computer workstation for command

    entry, information management, network alarm management, and database management

    functions. All real-time control functions, including scheduling, history collection and alarming,

    shall be resident in the BMCS controllers to facilitate greater fault tolerance and reliability.

    2.1.2 Workstation System Architecture – The architecture of the workstation shall be implemented to

    conform to industry standard APIs (application specific interfaces), so that it can accommodate

    applications provided by the BMCS Contractor and by other third party applications suppliers,

    including but not limited to Microsoft Office Applications. Specifically it must be implemented toconform to the following interface standards:

    a)  All historical information contained in Time Series Databases and all configuration data

    contained in relational databases must be accessed via ODBC (utilizing ANSI SQL

    database query specifications).

     b)  All real-time, online building data must be accessible by all applications (including, but

    not limited to, graphics, reports, etc.) via OPC (OLE for Process Control).

    c)  All real-time event data (including alarms, change of state events, warning events, etc.)

    shall be accessible by all applications via OPC (OLE for Process Control).

    d)  The BMCS Contractor shall provide all necessary OPC servers for communicating to the

    DDC controllers that are provided as part of this contract. In addition, the system shall

    accommodate installation and registration of OPC servers provided in the future by other

    equipment suppliers.

    e)  Workstation Operator Applications architecture – Major operator viewing applications

    shall be implemented utilizing the current Microsoft Model of an Active-X control, to be

    contained in one or more Active-X compliant containers. Specifically, the graphics

    application shall be provided as an Active-X control (for example it shall be possible to

    embed a graphic in a web page and view it in Internet Explorer). Conversely, it shall be

     possible to embed other Active X controls—such as trends and other third party

    available controls—in the real-time graphic application.

    f)  PC Hardware – The PC for Operator Workstation shall be supplied from Compaq, IBM

    or HP. The personal computers shall be configure as follows:

      Memory – 512 MB Ram PC 266 MHz

  • 8/18/2019 Akjh d Bms Specification

    14/35

    AKH COMMERCIAL TOWER

    Plot No.47/Sector 1/74-Al Kashlaa, Dahran/Dammam/K.S.A

    Tender Volume 3, Part-E

    Section 25 00 00: BMS and Control System Page 14 of 35 Rev.00 – June 2013

    Tender Documents

      CPU– Pentium-IV or greater; 2.0 GHz or Faster Clock Speed

      Hard Drive – 80 GB or greater hard drive

      Hard drive backup system – OMEGA JAZ 1.3 Optical Drive;

     

    Floppy Drive – 3 1/2” Diskette Drive

      CD ROM Drive – 52X performance

      Ports – (2) Serial and (1) parallel Ports, ESP

      Keyboard – 101 Keyboard and Mouse

    CRT configuration

    i.  Each CRT – 17” SVGA Monitor 1280 x 1024 NI resolution minimum. 26 or

     better dot pitch and 72 Hz. minimum vertical refresh rate or max resolution;

    65K colors.

    ii. 

    CRTs can be configured and operated as either individual monitors or as asingle console system, with a resolution of 1280 x 1024.

    iii.  LAN communications – Ethernet communications board; 3Comm or equal.

    Operating System Software:

    Windows NT 4.0, Windows 98, or Windows 2000 Professional.

    Complete operator workstation software package, including any hardware or software

    keys. Include the original installation disks and licenses for all included software, device

    drivers, and Peripherals.

    Provide software registration cards to the Employer for all included software.

    Peripheral Hardware:

    Alarm printers:

      Printer Make – Epson or equal

      Printing Method – 24 Pin Dot Matrix, 136 column –print width

      Print Speed – 550 Characters Per Second, Per Line

      Buffer – 128 Kb

     

    Graphics printing – upto 360 x 360 dpi  Interfaces – Bi-directional Parallel, USB 1.1

    Reports printer:

      Printer Make – Hewlett Packard Laser Jet

      Print Speed – Black 25 Pages per minute

      Print Quality – 1200 x 1200 dpi, black

      Memory Standard – 32 MB upgradable upto 256MB

    2.2 PORTABLE OPERATORS TERMINALS

    2.2.1 Portable Operators Terminals (POT) shall be provided for operator readout of system variables,

    override control, and adjustment of control parameters at all plant controllers. POTs shall be handheld. POTs shall be provided which are plug-compatible with PCPs. POTs shall display points with

    English-language descriptions.

    One hand held Portable Operator’s Terminal or one Lap-Top shall be provided as Portable Operators

    Terminal for the Terminal Equipment Controllers (TEC).

  • 8/18/2019 Akjh d Bms Specification

    15/35

    AKH COMMERCIAL TOWER

    Plot No.47/Sector 1/74-Al Kashlaa, Dahran/Dammam/K.S.A

    Tender Volume 3, Part-E

    Section 25 00 00: BMS and Control System Page 15 of 35 Rev.00 – June 2013

    Tender Documents

    2.2.2 The POTs shall be complete with command keys, data entry keys, cursor control keys, and a liquid

    crystal alpha-numeric display. Access is to be via self-prompting menu selection with next

    menu/previous menu and step forward/step backward within a given menu. Connection of a POT to

    a panel shall not interrupt nor interfere with normal network operation in any way, prevent alarms

    from being transmitted, or preclude remote initiated commands.

    2.2.3 Connection of any TEC POT at any TEC or TEC space sensor shall provide display access to all

    TECs on the respective bus

    2.2.4 TEC POT functionality shall include:

    Display for each zone:

    a)  Space temperature

     b)  Local setpoint value (Degrees Foor C

    o)

    c) 

    Mode: Occupied/Unoccupiedd)  Mode: Heating/Cooling

    e)  Valve percent open

    f)  Heating status

    g)  Zone override status

    Display and command for each zone:

    a)  Setpoint select (local/remote)

     b)  Allowable local setpoint range

    c)  Unoccupied setpoint - cooling

    d)  Unoccupied setpoint - heating

    2.2.5 PCP POT functionality shall be as follows:

    Use of a POT at PCPs shall allow the user to display software information; and, via password

    control, modify PCP software. Two levels of user controlled passwords shall be provided. The first

    level shall allow the user to modify, create, or delete time programs; and the second level shall allow

    the user to modify data point text descriptors, reset totalizers, modify setpoints and parameters, set

    the system clock, and view trend logs and alarms.

    Selecting TIME PROGRAM from the top level POT menu shall present an English menu of all PCP

    time programs (such as HEATING ZONE EAST, etc.) Selecting a time program (via up-down scroll

     bar) shall present options for the selected program of TODAY, DAILY, WEEKLY, and ANNUAL.

    a) Selecting TODAY shall present the current time program for the selected zone. Each time

     program shall list start and stop times along with program commands and/or values (fortime programmed analog commands).

     b) Selecting DAILY, WEEKLY, or ANNUAL time programs shall present similar display

    and command options for these programs.

    Selecting DATA POINTS from the top level menu shall initiate an interactive process to select any

     point via English menu, select manual or analog commanding of the point, select a display of

    equipment accumulated runtimes, select a historical trend log display of any trended point, or display

    all points whose alarm capability has been suppressed and allow the suppression to be cancelled.

    Selecting PARAMETERS from the top level menu shall initiate a scrolling of all PCP parameters

    (such as alarm units, control settings, etc.) which may be displayed and commanded.

    Selecting ALARMS from the top level menu shall present a menu of four alarm display options.

    Selecting ALARM MEMORY shall scroll a list of all alarms in memory with English descriptor,

    alarm value or status, alarm type (low alarm limit, etc.), and time of occurrence. Selecting POINTS

  • 8/18/2019 Akjh d Bms Specification

    16/35

    AKH COMMERCIAL TOWER

    Plot No.47/Sector 1/74-Al Kashlaa, Dahran/Dammam/K.S.A

    Tender Volume 3, Part-E

    Section 25 00 00: BMS and Control System Page 16 of 35 Rev.00 – June 2013

    Tender Documents

    IN ALARM will produce a similar display of all points currently in alarm. Selecting CRITICAL

    ALARMS shall display critical points currently in alarm. Selecting NON-CRITICAL alarms shall

    display non-critical points still in alarm.

    Selecting TREND LOG from the top level menu shall initiate a scroll selection bar of English

    descriptors of all points being trended, and allow selection of trend values/events with date and time

    of each historical occurrence.

    Selecting SYSTEM CLOCK from the top level menu shall allow the user to modify the

    calendar/time clock and enter a date for automatic change to/from daylight savings time.

    Furnish POTs at the chiller plant controller and air handling unit plant controller for use at all PCPs

    and TECs, and TEC space temperature sensors.

    As an alternative to the POTs, (for HVAC control only) a fixed liquid crystal or LED display and

    entry keyboard may be provided per DDC controller. Functional capability must be equal to that

    described for the POT as a minimum.

    2.3 REMOTE HVAC CONTROLLER HARDWARE

    2.3.1 Plant Control Processors shall be 16 bit microprocessor based with EPROM operating system

    (O.S.). DDC programs and data files shall be non-volatile EEPROM or flash memory to allow

    simple additions and changes. Each PCP shall have an on-board realtime clock with battery backup

    of a minimum of 30 days.

    2.3.2 Remote PCPs shall be provided where shown or specified with capacity to accommodate

    input/output (I/O) points required for the application plus spare points specified. These panels shall

     be configured with analog and digital inputs and outputs, and pulse counting totalizers and such that

    the primary input, the output and all control logic shall be resident in a single microprocessor to

     provide network independent stand-alone closed loop DDC. Each panel shall be provided with asocket for a Portable Operators Terminal (POT). All panel inputs shall be selected for the

    application utilizing sensor types listed under the sensor section of this specification. PCP outputs

    shall be binary for On-Off control, and / or true variable voltage (0-10v) for driving analog. Analog

    outputs shall have a minimum incremental resolution of one percent of the operating range of the

    controlled device.

    2..3.3 PCPs shall be designed for complex DDC and energy management applications, peer-to-peer

    communications with other PCPs, or optionally for coordination, management, and data

    concentration for sub-networks of TECs. Each PCP shall have an integral real-time clock for

    true stand-alone operation (software clocks are not acceptable).

    2.3.4 PCPs shall have LEDs for continuous indication of peer bus communications, power, and

    operational status. PCPs driving TEC busses shall also have LEDs indicating the status of TEC

     busses. All LEDs shall be visible without opening the panel door.

    2.3.5 All panel electronics shall be installed in enclosures of IP54 rating. Equipment room panels shall

    have hinged doors and shall also contain all load relays, transducers, and associated equipment.

    2.3.6 Terminal Equipment Controllers shall be based on the latest ECHELON LON Talk technology and

    shall be specific for the type of Terminal Equipment used, FCU's in this project. TECs shall be

    capable of processing sensor signals of the applications specified, and shall have capability to drive

    outputs required by the application. The TEC’s shall communicate with the zone manager at a speed

    of 78K Bauds minimum.

  • 8/18/2019 Akjh d Bms Specification

    17/35

    AKH COMMERCIAL TOWER

    Plot No.47/Sector 1/74-Al Kashlaa, Dahran/Dammam/K.S.A

    Tender Volume 3, Part-E

    Section 25 00 00: BMS and Control System Page 17 of 35 Rev.00 – June 2013

    Tender Documents

    2.4 HVAC DATA COMMUNICATIONS

    2.4.1 All PCPs shall be interconnected via a primary communications network. TECs shall also beconnected together via secondary networks managed by PCPs to provide data concentration and

     parallel processing such that system expansion does not noticeably affect system response. All

    communications shall be via twisted pair wires, shielded where required. DDC microprocessor

    failures shall not cause loss of communications of the remainder of any network. All networks shall

    support sensor sharing, global application programs, and bus-to-bus communications without the

     presence of a host PC.

    2.4.2 The PCP communications network shall support true peer protocol such that each PCP has equal

    rights for data transfer and shall report in its token passing time slot. No single device shall be

    designated as the communications master but each device on the bus shall be capable of taking over

    the function of bus monitor to assure that loss of any single device will not cause total bus failure.

    Those systems using dedicated communication controllers or other single point of failure devices in

    lieu of a true peer protocol shall provide dual redundant transmission media with automaticswitching in the event of line faults.

    2.4.3 Full communications shall be sustained as long as there are at least two operational devices on any

    segment of the bus.

    2.4.4 Error recovery and communication initialization routines are to be resident in each bus connected

    device.

    2.4.5 For reliability, maintainability, and performance communication busses shall be extendable to 4000

    feet with 29 devices and without active links, hubs, or repeaters.

    2.4.6 Other than sensor/data sharing specified (with failure default procedures), under no circumstances

    shall DDC programs be reliant on sensor data from another panel.

    2.4.7 TECs shall be managed by their Zone Managers. The Zone Managers shall communicate to the

    PCPs via an active network to provide alarm detection and reporting, data sharing, and response to

    POT data requests and commands. TEC network shall also support POT communications from TEC

    to any other networked TEC and from the PCP to any connected TEC.

    2.5 ELECTRICAL AND MECHANICAL CONTROL DEVICES

    2.5.1  Chilled Water Automatic control valves 2" and smaller shall be screwed type, of red brass material

    and valves 2½" and larger shall be cast iron type and flanged. Valves shall be ANSI-rated to

    withstand the pressures and temperatures encountered. Valves shall have stainless-steel stems and

    spring loaded Teflon packaging with replaceable discs. All valves shall have the manufacturersname/logo embossed on the valve.

    2.5.2 Chilled Water Valves shall be sized for a pressure drop greater than or equal to the coil they serve.

    2.5.3 Chilled Water valves shall be two-way type as specified in the sequence of operation. Shall be

    PN16, bronze body. Stems shall be polished stainless-steel suitable temperature range of 2 to 110°C.

    2.5.4 All automatically controlled devices shall be provided with electric / electronic actuators sized to

    operate their appropriate loads with sufficient reserve power to provide smooth modulating action or

    two-position action and tight close-off.

    2.5.5 Actuators shall be provided with suitable corrosion resistant linkages for valves or dampers. Except

    as specified herein, all actuators shall be sized for the load/close off encountered in strict accordancewith manufacturers recommendations. All actuators on outside air dampers, relief air dampers, and

    convertor steam valves shall be heavy duty type with oil immersed gear train. All actuators shall

    drive to their "normal" position anytime their associated AHU (etc.) is shut down.

  • 8/18/2019 Akjh d Bms Specification

    18/35

    AKH COMMERCIAL TOWER

    Plot No.47/Sector 1/74-Al Kashlaa, Dahran/Dammam/K.S.A

    Tender Volume 3, Part-E

    Section 25 00 00: BMS and Control System Page 18 of 35 Rev.00 – June 2013

    Tender Documents

    2.5.6 Direct coupled modulating actuators shall be 24 volt type with 2 to 10 VDC control signal. Direct

    coupled on/off actuators shall be 24 VAC. The torque and the close off ratings shall match the

    application used.

    2.5.7 Firestats shall be 135 degrees manual reset type.

    2.5.8 Duct Smoke Detectors shall contain an air sampling chamber with sampling tubes extending through

    the width of the air duct. Alarm status indicating lights shall be visible on the front of the detector.

    2.5.9 DDC/VAV Controller

    Controller shall consist of a one piece DDC controller complete with microprocessor, power supply,

    self calibrating pressure transducer, and integral actuator. Provide DDC/VAV controller factory fit

    and calibrated for the minimum and maximum air flows scheduled on the drawings.

    Controller housing shall be UL 94-5 5V or equivalent listed material for use in ceiling plenum

    applications without need of special metal enclosure. Cotroller shall work over an ambienttemperature operating range of 0-55oC (32-122oF), 5-95% non condensing humidity. Power supply

    to unit shall be 20-30 VAC, 50 Hz, maximum power consumption of 5VA.

    For reheat applications, provide factory fitted power relays rated for coils as required. Mount relay

    in electric control enclosure and wire to DDC/VAV controller.

    Controller shall be UL 916 listed, CE mark compliant, and conform to IEC 801.4 transient and surge

    immunity standards. UL and CE marks shall appear on product labels.

    Unit shall operate properly over inlet velocity pressure range of 0.00 to 2.00 in WC (0-500 Pa). End

    to end accuracy shall be +/- 5% of flow measured at 250 Pa inlet velocity pressure.

    Cooling only model DDC/VAV controller shall be used in cooling only applications. Cooling andreheat model DDC/VAV controller shall be used in reheat applications and contain 3 Form A relays,

     pilot duty rated for control of floating proportional, time proportional or staged reheat valves and

    coils.

    Integral damper actuator shall be 53 lb-in (6 N-m) torque, over the shaft mounting type. Stroke shall

     be fully adjustable from 0-90 degrees rotations with visible position indicator. Actuator shall be

    equipped with manual position override. The actuator stroke time shall be 3.6 minutes maximum for

    90 degree rotation at 50 Hz operation.

    Room temperature sensor shall be complete with digital LCD display. Temperature sensor shall

     permit local adjustment of temperature setpoint, minimum flow, and maximum flow.

    Temperature sensor shall permit display of any of the four variables such as room temperature, roomtemperature set point, air flow and maximum flow setpoint.

    The VAV room digital thermostat shall also display the following:

    Room space temperature (Degree C or in Degree F freely configurable)

    Room temperature setpoint (Degree C or in Degree F freely configurable)

    Date and time

    Ambient temperature

    Maximum flow

    Minimum flow

    Box flow

    The room temperature sensor shall be wired to the DDC/VAV controller using a two wire non

     polarity sensitive cable.

    The room thermostat shall have plug-in facility to a portable operator terminal to get the following

  • 8/18/2019 Akjh d Bms Specification

    19/35

    AKH COMMERCIAL TOWER

    Plot No.47/Sector 1/74-Al Kashlaa, Dahran/Dammam/K.S.A

    Tender Volume 3, Part-E

    Section 25 00 00: BMS and Control System Page 19 of 35 Rev.00 – June 2013

    Tender Documents

    additional operation such as:

    Damper percentage opening

    Differential pressure across flow sensor

    Flow in CFM

    VAV box maximum flow

    VAV box minimum flow

    Heater status

    Minimum flow setting for heaters

    It shall be possible to modify the VAV controller parameters from the room thermostat key buttons

    without the use of any additional devices.

    The controller should have the option of working along with a duct thermostat as well.

    2.6 ELECTRONIC DATA INPUTS AND OUTPUTS

    2.6.1 General

    a)  Input/output sensors and devices shall be closely matched to the requirements of the remote

     panel for accurate, responsive, noise-free signal input/output. Control input response shall

     be high sensitivity and matched to the loop gain requirements for precise and responsive

    control. In no case shall computer inputs be derived from pneumatic sensors or

    thermocouple.

     b)  Temperature sensors shall be Resistance Temperature Detector (RTD) type of 100, 1000,

    or 3,000 ohm platinum, or 20,000 ohm.

    c)  Space temperature sensors shall be in attractive housing made from flame retardant ABS.

    d) Control relays and analog output transducers shall be compatible with PCP output signals.Relays shall be suitable for the loads encountered.

    2.6.2  Duct temperature sensors shall be rigid stem or averaging type as specified in the sequence of

    operation. The terminal box shall be IP54 and of flame retardant plastic. Outside air, return air,

    discharge air, space and well sensors shall have + or – 0.5 degrees C accuracy between OoC degrees

    and 100oC.

    2.6.3 Water flow analog sensors shall be IP66 magnetic type, cast steel upto 25 mm and Aluminium alloy

    for sizes 40mm and above. Operational accuracy shall be ±5%. It shall be suitable for 240 VAC with

    a current output of 4-20mA. The electrodes shall be detachable for easy cleaning, it should not

    require the removal of the flow meter. The flow meter shall have an 3.5 segment 7 LED indicator.

    Water sensors shall be provided with a separable copper, monel or stainless-steel well. The sensor

    shall have an accuracy of class B as per DIN IEC 751.

    2.6.4  Relative humidity sensors shall be capacitance type with 10% to 90% range. Duct mounted

    humidity sensors shall be provided with a sampling chamber. Wall mounted sensors shall be

     provided with decorative covers identical to temperature sensors.

    2.6.5  Differential and Static Pressure Sensors and Switches:

    a) Fan proof-of-flow switches shall be of the adjustable set point and differential pressure

    type. Switches shall be piped to fan discharge except where fans operate at less than one

    inch water column (WC), they shall be piped across the fan. For fractional horsepower and

    non-ducted fans, relays or auxiliary contacts may be used. Maximum pressure rating shall be at least 10 inches water column.

     b) Pump proof-of-flow switches shall be of the adjustable differential pressure or flow type as

    specified in the sequence of operation or data point summary. Devices shall be 150 psi

  • 8/18/2019 Akjh d Bms Specification

    20/35

    AKH COMMERCIAL TOWER

    Plot No.47/Sector 1/74-Al Kashlaa, Dahran/Dammam/K.S.A

    Tender Volume 3, Part-E

    Section 25 00 00: BMS and Control System Page 20 of 35 Rev.00 – June 2013

    Tender Documents

    rated except chilled water flow switches shall be provided with totally sealed vapor tight

    switch enclosure on 300 psi body. Differential pressure switches shall have valved

    manifold for servicing.

    c) Air flow and duct static pressure analog sensors shall be high accuracy suitable for the low

     pressures to be encountered.

    2.7 OPERATOR STATION SOFTWARE

    2.7.1 General:

    Operator Station software shall include as a minimum the Operating System (OS) as desirable in

    section 2.1, Data Base Manager, Communications Control, Operator Interface (OI), Trend and

    History Files, Report Generator, Support Utilities, Scheduler and Time and Event Support Programs.

    2.7.2 Real time operating system shall be multitasking providing concurrent execution of multiple

     programs and custom program development. When the BMCS software is put in the background itshall continue to work, sampling the data, printing the alarms / reports, etc.

    2.7.3 Data Base manager is to manage all data on an integrated and non-redundant basis. It shall allow

    additions and deletions to the data base without any detriment to the existing data. Cross linkages

    are to be provided such that no data required by a software program may be deleted by the operator

    until that data has been deleted from its respective program.

    2.7.4 Communications control, scheduler, trend files, reports, operator interface, and utilities shall be as

    specified hereinafter.

    2.7.5 Operator Interface Software

    Provide a hierarchical linked dynamic graphic operator interface for accessing and displaying system

    data and commanding and modifying equipment operation. The interface shall utilize the mouse to

     provide "heads up operation" with pull-down menus, dialogue boxes, zoom, coloration and

    animation to facilitate operator understanding of the system. A minimum of twenty (20) levels of

    graphic penetration shall be provided with the hierarchy operator assignable (for example, area,

     building, wing, floor, air handler, sequence of operation pages, dynamic program display, point

    group) etc.

    2.7.6 Dynamic system data points shall be assignable to each penetration level. Descriptors for graphics,

     points, alarms, etc. shall be modified through the operator's station under password control.

    2.7.7 Operator access to the system is to be under personal ID and password control for up to 100 unique

    operators. Up to 12 alphanumeric characters for personal ID and up to 12 alphanumeric charactersfor password shall be assignable to each operator via the operator station. The operator shall be able

    to access the system from any operator station in the system by entry of the proper ID and password.

    The operators shall be permitted to change their own password without permitting access to any

    other password. Sign-off from a station shall be a manual operation via pull-down menu or, if no

    mouse or keyboard activity takes place within an assignable time period, shall be automatic.

    Automatic sign-off period shall be selectable from ten minutes to 120 minutes for each operator or

    may be disabled on a per operator basis. All sign-on/sign-off activity shall be automatically archived

    on the operator station disk for subsequent display or printout as desired.

    2.7.8 Operator access to system points shall be controlled by individual operator-assigned graphic

    hierarchy and by privileges. The hierarchy shall permit access to an operator-assigned initial graphic

    and to all graphics linked to and below the initial graphic. The operator shall not have access to

    graphics in another hierarchical graphic "tree". For example, an operator may have access to one building, but not to another building, or to lighting points, but not fire alarm points. Each operator

    shall have any combination of user assigned keyboard privileges of alarm acknowledgement, point

    commanding, data modification, DOS access, schedule changes, and system configuration changes.

  • 8/18/2019 Akjh d Bms Specification

    21/35

    AKH COMMERCIAL TOWER

    Plot No.47/Sector 1/74-Al Kashlaa, Dahran/Dammam/K.S.A

    Tender Volume 3, Part-E

    Section 25 00 00: BMS and Control System Page 21 of 35 Rev.00 – June 2013

    Tender Documents

    2.7.9 Data to be displayed within a unique graphic shall be assignable regardless of physical hardware

    address, communication channel or point type (temperature, humidity, fire alarm, etc.). Graphics are

    to be on-line programmable and under ID and password control. Points may be assignable to

    multiple graphics where necessary to facilitate operator understanding of system operation and

    where specified. Graphics shall also contain calculated or pseudo points. Each physical point and

    each other point assigned to a graphic shall be assigned in English descriptor for use in reports.

     

    2.7.10 Data segregation shall be provided for control of specific data routed to an operator station, or to a

    given output device such as a printer. Point classes shall be randomly selectable such as all fire

     points, fire points second floor, all space temperature points, HVAC points, command points, etc.

    Display and/or output of data to printer or color monitor shall occur where there is a match of

     peripheral segregation class assignment and the point segregations.

    2.7.11 Operators and peripherals shall be assignable and all assignments are to be on-line programmable

    and under password control.

    2.7.12 Penetration within a graphic hierarchy shall display each graphic name as graphics are selected to

    facilitate operator understanding. The "backtrace" shall permit the operator to move upward in the

    hierarchy by mouse click on the backtrace. The backtrace shall show at least the previous four

     penetration levels. The operator shall be provided the option of showing each graphic full screen size

    with the backtrace as the horizontal header or by showing a "stack" of graphics, each with a

     backtrace.

    2.7.13 All operator accessed data shall be displayed on the color monitor. The operator shall select further

     penetration via mouse click on an area, building, floor, fan, etc. The defined linked graphic below

    that selection shall then be displayed. Dynamic data shall be assignable to any and all graphics.

    2.7.14 The operator shall be provided with a means to directly access any graphic or any point without

    going through the penetration path.

    2.7.15 Direct access to graphics shall be menu selectable wherein the operator may optionally enter the

    name of the graphic system desired or select the desired graphic via cursor positioning on a scroll bar

    listing of all graphics, or may be selected via keyboard entry.

    2.7.16 Points (physical and pseudo) shall be displayed with dynamic data provided by the system with

    appropriate text descriptors, status or value, and ENGINEER ing unit. Coloration shall be used to

    denote status and alarm states. Coloration conventions shall be variable for each class of points, as

    chosen by the Employer. In addition, animation shall be used to confirm latest status (e.g., fan

    rotation, damper position, fluid flow, etc.) where specified. All points shall be dynamic with update

    rates user adjustable on a per point basis from 20 seconds to 120 seconds, depending upon the

     process dynamics.

    2.7.17 For operators with the appropriate privilege(s), points shall be commanded directly from the color

    monitor via mouse selection. For a digital command point such as a changeover valve position, the

    valve would show its current state (e.g., CLOSED) and the operator could select OPEN via mouse

    click. For most operations, a keyboard equivalent shall be available for those operators with that

     preference. Upon selection of analog commandable points (such as discharge air static pressure), a

    dialogue box shall appear containing the following:

    The decimal value of the setpoint with adjacent up-down arrows.

    The operator shall be afforded three methods of analog commanding from which to choose as

    follows:

    Click the cursor on the decimal setpoint value, and enter a new setpoint value via the keyboarddecimal keypad.

    Drive the decimal value up or down via the up-down arrows.

  • 8/18/2019 Akjh d Bms Specification

    22/35

    AKH COMMERCIAL TOWER

    Plot No.47/Sector 1/74-Al Kashlaa, Dahran/Dammam/K.S.A

    Tender Volume 3, Part-E

    Section 25 00 00: BMS and Control System Page 22 of 35 Rev.00 – June 2013

    Tender Documents

    "Drag" the set point arrow up or down by moving the cursor to the desired position and clicking.

    The bar chart shall also have an associated colored scale showing the current position (scaled value)

    of the alarm limits.

    2.7.18 An operator shall be permitted to split or resize the viewing screen to show one graphic on the left

    half of the screen and another graphic, spreadsheet, bar chart, word processing, curve plot, etc., on

    the right half screen. This will allow real time monitoring of one part of the system while displaying

    other parts of the system or data from the system to facilitate system operation.

    2.7.19 An on-line context-sensitive "help" utility shall be provided to facilitate operator training and

    understanding. The help feature shall be a hypertext document with the ability to bridge to further

    explanation of selected keywords. The document shall contain text and graphics to clarify system

    operation. At a minimum, help shall be available for every menu item and dialogue box. If the help

    utility does not have this ability to bridge on keywords for more information, four complete sets of

    user manuals shall be provided with quarterly updates and additional training as hereinafter

    described.

    2.7.20 Electronic messaging facility shall be provided on the operator station for any operator to enter a

    message to another operator by selecting the MAIL menu item, selecting the receiving operator's ID

    and entering the message (such as CLEAN PRE-HEAT STRAINER ON AHU-16"). When an

    operator with a queued message signs onto the operator station, the "Mail Message" area of the

    dialogue box shall indicate that a message is waiting. Upon selecting a mail display, the operator

    shall be presented an index of the title or subject of each from which he may select the order of

    display. Upon displaying a mail message, the display shall prompt the operator with three message

    options to execute; delete, print, or save. Messages shall also include the time and date the message

    was sent, the sender's personal ID, and be 300 characters minimum length, plus a brief title or

    subject description.

    2.7.21 Site Specific Customizing Software.

    Provide software which will allow the user to modify and tailor the BMCS to the specific and unique

    requirements of the equipment installed, the programs implemented, and to staffing and operational

     practices. Online modification of system configuration, program parameters, and data base shall be

     provided via menu selection and keyboard entry of data into preformatted self-prompting templates.

    As a minimum, the following modification capability shall be provided.

    a) Operator assignment capability shall include designation of operator passwords,

     privilege(s), starting graphic and auto sign off duration.

     b) Peripheral assignment capability shall include assignment of segregation groups to consoles

    and printers, and designation of backup printers.

    c) System configuration/diagnostic capability shall include communications and peripheral

     port assignments, PCP enable/disable, assignment of command trace to points and initiation

    of diagnostics.

    d) System text add/change capability shall include action messages for alarms and runtime,

    and trouble condition messages.

    e) Time/Schedule change capability shall include time/date set, time/occupancy schedules,

    holiday schedules, and daylight savings time schedules. All time and calendar scheduling

    and schedule modification shall be accomplished graphically via color bars and calendars

    in a hardware independent manner.

    f) Points shall be uniquely defined as to coloration, animation, audible rate and duration, pointdescriptors, operator messages (480 characters minimum), printer options, alarm archival

    option, alarm and warning limits, and ENGINEER ing units. All messages specified and

    all physical and pseudo point descriptors shall be entered by the vendor.

  • 8/18/2019 Akjh d Bms Specification

    23/35

    AKH COMMERCIAL TOWER

    Plot No.47/Sector 1/74-Al Kashlaa, Dahran/Dammam/K.S.A

    Tender Volume 3, Part-E

    Section 25 00 00: BMS and Control System Page 23 of 35 Rev.00 – June 2013

    Tender Documents

    g) Point related change capability shall include system/point enable/ disable; run time

    enable/disable; assignment of points to point classes, analog value offset, lockout, run time

    limits, and setting a fixed input value or output status.

    Graphic construction is specified under Graphic Creation.

    2.7.22 Alarm handler software shall be provided to respond to alarm conditions sensed and transmitted

    from PCPs and TECs. First in, first out handling of alarms in accordance with alarm priority ranking

    (fire alarm first, security second, etc.) is required with buffer storage for a minimum of 20 alarms in

    case of simultaneous multiple alarms. Alarm handler shall be active in both the Signed On and

    Signed Off modes to assure that alarms will be processed even though an operator is not currently

    signed on.

    Alarms shall be displayed in a dialogue box of the color monitor. Display shall include as a

    minimum:

    a) Indication of alarm condition; i.e., ABNORMAL OFF, HI ALARM/LO ALARM, analogvalue or status, and English point identification.

     b) An unique per point alarm action message; i.e., "The fan has shutdown due to an

    excessively high discharge duct pressure. There is a strong indication of a system

    malfunction such as an inlet vane drive failure, or major fire damper closure. The switch

    should not be manually reset until a thorough check of the cause is conducted" of up to 480

    characters.

    Alarms are to be directed to appropriate operators, operator stations, and printers for segregation

    assignments as specified in previous sections of this specification.

    Alarm silencing shall be by selecting the "silence" button or by authorized operator's

    acknowledgment. In all cases, alarm acknowledgment shall only be allowed by operators authorizedto acknowledge a point in alarm.

    Each point shall be assigned to an alarm class, with no limit to the quantity of alarm classes. Each

    alarm class shall be uniquely assignable to any combination of the following alarm processing

    attributes:

    a)  Audible beep duration (none, 10 seconds, 20 seconds, continuous)

     b)  Audible beep rate (slow-medium-fast)

    c)  Alarm historically archived (yes or no)

    d) 

    Alarm printed, with printer ID

    e)  Associated coloration with any of 256 colors, with separate brightness control, assignable

    to each alarm state (high alarm, etc.) and similarly be distinguished with different colors for

    each possible state.

    Alarms shall be displayed and/or printed at each peripheral to which its segregation allows, but only

    those operators having proper privilege level will be allowed to acknowledge alarms.

    An unacknowledged alarm indicator shall be provided on the color monitor display to alert the

    operator that there are unacknowledged alarms in the system.

    Symbols for points in a graphic display that are in an unacknowledged alarm state shall flash red;when in an acknowledged state, the symbol shall be non-flashing-red.

    Run time limit messages shall be presented and processed as alarm messages except the action

    message shall be of a maintenance directive nature.

  • 8/18/2019 Akjh d Bms Specification

    24/35

    AKH COMMERCIAL TOWER

    Plot No.47/Sector 1/74-Al Kashlaa, Dahran/Dammam/K.S.A

    Tender Volume 3, Part-E

    Section 25 00 00: BMS and Control System Page 24 of 35 Rev.00 – June 2013

    Tender Documents

    2.7.23 Standard reports shall be provided which shall be operator selectable to appear on the operator

    station, any selected printer or both. A "terminate report" command shall be available to allow the

    operator to stop any report in the process of being printed. In the event of failure of any printer,

    subsequent reports directed to that printer shall be automatically redirected to an operator pre-

    assigned backup printer located at the operator station. The following standard pre-formatted reports

    to be provided shall include:

    Point summary reports may be requested at any penetration level (facility, building, area, system)

    and shall include only points at and below that level. Point summary reports shall include the

    current value/status and condition, English system and point descriptors for all points. Point

    summary reports shall be selectable for all points, only those points in alarm, fixed points, disabled

     points locked out points, locked out and in alarm points, analog input or output points, digital input

    or output points. All reports shall be capable of being scheduled to run at a specific time and/or

    interval via an operator function supported by necessary data entry templates and interactive

     prompts.

    Dynamic trends shall provide up to six points and show real time activity of the associated points.

    This information shall be printed and/or displayed in numeric, bar chart, curve plot, pie chart, etc., as

    selected by the operator. Graphic plots shall allow a unique color for each point. As new point

    values are sampled, they shall be processed, scaled, and dynamically appended to any plot being

    displayed. Sample interval of points selected for dynamic trend shall be user selectable from five

    seconds to sixty minutes.

    Alarm and run time reports shall be automatically issued to assigned printers immediately upon

    occurrence, and shall consist of the point descriptor, the status or value of the point with

    ENGINEER ing unit, the time and date, and an action taking alarm message.

    The user shall be provided with a command trace feature selectable on a per point basis allowing the

    archiving of all commands issued to each point. The archived trace shall include the command, thecommand source, the point ID, and the time and date. Command trace reports shall be output upon

    operator demand.

    A custom report capability shall be provided to allow the user to format reports of any mix of text,

     points with status/value and descriptors, and points with status/value only. Custom reports may be

    scheduled or requested manually. A spreadsheet program similar to Microsoft Excel shall be

     provided fully integrated with the BMCS data base, and available to the user. Spreadsheet packages

    which require offline execution or manual translation of data files from one program format to

    another are not acceptable.

    2.7.24 Trend reports shall allow the operator to randomly select logical arrays of points to be recorded at

    selectable time intervals.

    Trend point archival - Each PCP trend point system (hardware and software) shall be assignable to

    PC archive files at user selectable intervals of 10 seconds to 24 hours. Trend data sample resolution

    shall be a minimum of one degree or one percent of the points range, whichever is smaller. Each

     point trend file shall have a user assignable selectable archive duration of a day, a week, a month, or

    a year. For any duration period selected, the file shall retain one full duration period while it collects

    another (i.e., after collecting data for May, May is retained in total as June data is accumulated).

    2.7.25 Trend display points shall be subsequently printed/displayed individually or in logical groups of up

    to any eight points in any group. Points may be assignable to multiple trend groups. The system

    shall have up to 500 trend groups which may be predetermined by the user for a unique set of logical

     points and display characteristics.

    Single point displays. Single point trend reports shall be displayable by selecting the desired point

    from any system graphic upon which it is displayed or by entering it's keyname. Display

    characteristics shall be user pre-determinable for any desired display range (X-Axis period) and any

  • 8/18/2019 Akjh d Bms Specification

    25/35

    AKH COMMERCIAL TOWER

    Plot No.47/Sector 1/74-Al Kashlaa, Dahran/Dammam/K.S.A

    Tender Volume 3, Part-E

    Section 25 00 00: BMS and Control System Page 25 of 35 Rev.00 – June 2013

    Tender Documents

    desired data manipulation within the selected range.

    Template-selectable display range options shall be "current", "previous", or "date range" with range

    and appropriate data intervals. "Current" ranges shall be time periods of one hour, two hours, etc.,

    up to one year. Starting at the beginning of the range (i.e., a display of the "current" month shall

    start at 00:01AM the first day of the month and display selected values up to the present time). Data

    intervals within the selected ranges shall be selectable from ten seconds to one month, dependent

    upon the sample intervals. The X-Axis resolution shall accommodate up to 100 data values.

    "Previous" ranges shall be similar to current ranges, except that a full "range" of data (such as a full

    seven days of data for the past week, up to the present time) shall be provided. Selectable range,

    data intervals, and X-axis resolution shall be as specified for the "current" display range.

    Date range selection shall provide templates for the entry of year, month, date, hour, and minute for

    the beginning and the end of X-axis data. Selectable data intervals and X-axis resolution shall be as

    specified for the "current" range.

    a) Data manipulation. Within the selected X-axis intervals of the selected X-axis range ofdata, data manipulation options shall be template selectable as the actual, last, highest,

    lowest, or average of the actual data samples within each interval. For example, for data

    sampled every five minutes one might select the highest value within every two hours for

    the past week.

    From that display, noting the two hour period with the peak value, he may subsequently

    request a display of actual values every five minutes for the related two hour period.

     b) Point group displays. Point group displays shall be set-up by selecting each point desired

    to be displayed in a logical trend group and either setting up a new group with appropriate

    group name (such as AHU RETURN AIRTEMPS) or selecting an existing group from a

    drop-down menu. Group displays shall then be initiated by selecting a top-level menu-baroption trend, and selecting a trend group from a subsequent drop-down menu. From this

     point, template selectable display options shall be as specified for single point displays (i.e.,

    current, previous, date range, actual, highest, lowest, average).

    Trend presentation options. After defining a desired trend display as above, selectable presentation

    options of display, print, or spreadsheet shall be available.

    Display. Selecting "display" shall present the data in an automatically scaled multi-color curve plot.

    Curve plots shall include a color legend noting which color is associated with each point. Points

    shall each have a user modifiable full English point descriptor of no less than 60 characters.

    An English description of the trend display set up options shall also be automatically included on the

    display (such as "highest value every two hours for the last week").

    Print. Selecting "Print" shall initiate an immediate printout of the same data values used to construct

    the above curve plot. Print format shall include a header with a time column and eight-digit value

    columns of data. The appropriate ENGINEER ing unit shall be at the head of each column. The

     print header shall include a column point descriptor legend and an English description of the trend

    display set-up options as specified for the "display" option.

    Spreadsheet. Selecting the spreadsheet option shall present the display values (after data

    manipulation) in a spreadsheet (Microsoft Excel or Lotus 1-2-3) format. From this screen, the user

    may edit the values to correct problems (missing data, failed sensors, errors). After editing, display

    or print options specified above may be executed, or any other standard spreadsheet data

    manipulation options may be exercised.

    2.7.25 Graphic Creation. An on-line graphic development facility shall be provided to allow the user to

    develop or modify graphic displays and assign and position any array of points within each graphic.

  • 8/18/2019 Akjh d Bms Specification

    26/35

    AKH COMMERCIAL TOWER

    Plot No.47/Sector 1/74-Al Kashlaa, Dahran/Dammam/K.S.A

    Tender Volume 3, Part-E

    Section 25 00 00: BMS and Control System Page 26 of 35 Rev.00 – June 2013

    Tender Documents

    All graphic displays shall be on-line created via operator station graphics package. It shall not

    require taking the operator station off-line or interfere with point archiving and alarms. Graphics

    shall be created via mouse and keyboard selection of graphic library stored symbols and system

     profiles. Provide, in addition, the capability to create custom symbols, system profiles, floor plans,

     buildings, etc., and to store them in the graphic library.

    The number and type of graphics to be provided is as noted in the Data Control and Graphics

    summary.

    The system shall provide expansion to a minimum of 250 graphics.

    2.7.26 Digital System Management. The Operation Station shall provide complete utilities necessary for

    management of the network of digital controllers and devices.

    Provide a multi-page set of dynamic graphic architectural displays showing each digital module

    including each remote panel, PC, peripheral, and communication links. Clicking on any device shallstart an interactive dialogue allowing the user to observe the device status and to select device

    management options. Each device shall also be provided with an English descriptor. Digital devices

    in a failed or non-responsive mode shall show up distinctly red in digital system graphics.

    PCPs may be up-line or down-line loaded to or from the Operator Station disk for backup archival.

    2.7.27 Operator Station Utilities. The Operator Station personal computer shall be provided with the

    following menu selected graphic system utilities or desktop application packages:

    Clock - Real Time Clock

    Calculator - Basic arithmetic calculation functions (add, subtract,

    multiply, divide, percent, square root)

    Clipboard - Data transfer facility between dissimilar programmes.

    Calendar - Electronic Appointment Calendar, with Auto A alarm

    Cardfile - Electronic index card file

    Control Panel - Basic PC operating characteristic control: cursor blink rate, mouse

    sensitivity, screen color control, etc.

     Note Pad - Archive for miscellaneous notes

    Write - Word processing program

    2.7.28 The system provided must be capable of running standard off-the-shelf MS DOS compatible

    software packages concurrently with the real time system. Fully tested and qualified integrated third

     party software packages including spreadsheet, data base manager, and word processing shall be

     provided capable of running under MS DOS is to be identified as system compatible and listed in the

    submittal.

    The base system software shall include a CRT "windowing" feature to allow the operator to monitor

    the real time system and use third party software simultaneously.

    All third party software packages identified shall have access to the system historical data base

     previously specified.

    2.8 REMOTE PANEL SOFTWARE

    2.8.1 Energy Management application programs and associated data files shall be in non-volatile memory.

  • 8/18/2019 Akjh d Bms Specification

    27/35

    AKH COMMERCIAL TOWER

    Plot No.47/Sector 1/74-Al Kashlaa, Dahran/Dammam/K.S.A

    Tender Volume 3, Part-E

    Section 25 00 00: BMS and Control System Page 27 of 35 Rev.00 – June 2013

    Tender Documents

    2.8.2 Optimum Start, Night Cycling and Night Purge for free cooling shall address the unique requirement

    of each systems Unoccupied Period, which may include one or more of the following as specified:

    a) Delay equipment start-up based on global outdoor temperature, space temperature, and

    system response to assure that comfort conditions are reached at scheduled occupancy time

    (occupancy schedules are defined under time programs), and operate in both heating and

    cooling cycles. In all cases, the optimum