12
STABILITY AND SUSTAINABLE DEVELOPMENT

Ais brochure en print 2014

Embed Size (px)

DESCRIPTION

 

Citation preview

Page 1: Ais brochure en print 2014

STABILITY AND

SUSTAINABLE DEVELOPMENT

Page 2: Ais brochure en print 2014

01

ARGOINVESTSTROY is a company working in the field of construction and design. We have more than 200 successfully completed projects with a total area of 400 000 square meters.

ARGOINVESTSTROY has proven its capabilities in the execution of public and residential projects, as well as industrial sites. It has more than 300 skilled employ-ees and construction workers operating in Bulgaria and Russia.

The company has demonstrated its professionalism by working with а number of first-class European Inves-tors such as Shell, Lukoil, Billa, Kaufland, Bilfinger & Berger, Immorent, etc.

We have implemented an Integrated Quality Manage-ment System, covering the following standards:

• EN ISO 9001: 2008 - Quality management system;

• EN ISO 14001: 2004 – Environmental management system;

• BS OHSAS 18001: 2007 - Occupational health and safety management system.

ARGOINVESTSTROY enjoys high confidence in the construction industry and is a member of the Bulgar-ian Construction Chamber. In addition, we have the necessary licenses for operating in Russia.With professionalism and responsibility, we fulfil our mission to offer competitive prices, deadlines and quality, which is the trademark of our company.

Page 3: Ais brochure en print 2014

02

Construction of two 5-storey residentialbuildings in Town of Noviy Urengoy, Russia

Employer: OOO “PF VIS”, Moscow

Total built-up area for both buildings:38 200 sq.m.

Completion period:April 2013 - September 2014

Employees involved:120 persons

Specific features:„Turn-key“ project of two 5-storey residential buildings - “Building 1” и “Building 2”, part of a new residential complex “Tundrovoy”, situated in the central part of Noviy Urengoy town, close to the administrative centre of the town.

Each building consists of 140 apartments.

The complex is building by using of modern materials in compliance with the new contemporary technologies.

The complex contains complete infrastructure which includes: kinder garden, school, sports area, childs’ playground, commercial area, cafe, postal office and police station.

Office and commercial areas are envisaged in the non-residential floors of the buildings.

Parking place is foreseen for each apartment.

Page 4: Ais brochure en print 2014

03

“Hemus” Business center,Sofiawith shops and underground parking level

Total built-up area:5 700 sq.m.

Time for completion:July 2013

Specific features:Public building with modern vision and functionality. It is built in compliance with the international standards for contemporary business building, which offers to its future inhabitants offices, shops and underground parking levels. It is situated on a key crossing in the center of the City of Sofia – on the corner of Cherni vrah Blvd. and Sveti Naum Blvd., near the Hemus hotel.

Office building on Stamboliyski Blvd.,Sofiawith shops, café, underground parking levels, powersubstation and fence.

Total built-up area:10 000 sq.m.

Time for completion: May 2010 – October 2011

Specific features:Complex execution of façade and roof. The site is with very complex logistic due to its location in the ideal center of the City. Unique solution of the façade in compliance withparticular designed detailed design.

Page 5: Ais brochure en print 2014

04

Office Building on Todor Alexandrov Blvd., Sofia

Total built-up area:10 300 sq.m.

Time for completion:May 2010 – December 2011

Specific features:Detailed design for the construction and waterproofing of three underground levels is characterized by bold and innovative solutions and using the latest equipment. Architectural and finishing works fully meet the highest requirements of the European standards.

“Elips centre” Office building:,Tsarigradsko shose blvd.,Sofiawith shops, restaurants, underground parking level and power substation

Total built-up area:18 500 sq.m.

Time for completion:Under construction

Specific features:Unique reinforced concrete structure, own design and production of formwork systems for the façade grid, extension of the bearing reinforcement with high-strength joints after preliminary certification of the company for this type of activity.

Page 6: Ais brochure en print 2014

05

Residential building inIvan Vazov – South Park districtwith shops and underground parking levels

Total built-up area:7 000 sq.m.

Time for completion:May 2010 - February 2012

Specific features:Building with distinctive architecture. It is built from reinforced concrete structure and curtain wall limestone façade. A complex steel structure serving for suspending the façade was developed especially for the project.

Residential building inIvan Vazov districtwith shops, offices, atelier and underground parking levels

Total built-up area:12 500 sq.m.

Time for completion:February 2012 – January 2013

Specific features:Building with unique architecture – dynamic staces containing extremely complex for implementation structural elements. Special attention is paid to the design and implementation of details of a ventilated facade made by ceramic bricks.

Page 7: Ais brochure en print 2014

06

“Labirint” Furnitue store,Sofia

Total built-up area:13 000 sq.m.

Time for completion:October 2006 – November 2007

Specific features:Outer shell and superstructure of an existing building without disturbing the commercial activities of the Employer thanks to precise logistics developments.

The Outer shell is built by traditional method from monolithic concrete. Two steel columns are designed for lightening the structure of the superstructure levels, and the floor plate is executed from shaped steel and concrete.

Chain of shops “Domko” across the country:Plovdiv, Bourgas, Sofia, Varna

Trade centre „Domko”,Plovdiv

Total built-up area:1 900 sq.m.

Срок за изпълнение :January 2004 – March 2004

Office and production plant of “SOLID”,Elin Pelin

Total built-up area:3 300 sq.m.

Time for completion:January 2005 – September 2005

Specific features:5-storey building with production halls, exhibition hall and dispatch and administrative offices. Monolithic reinforced construction.

Page 8: Ais brochure en print 2014

07

Chain of supermarkets “BILLA” across the country:Stara Zagora, Nova Zagora, Plovdiv, Bourgass, Peshtera, Samokov

BILLA MarketTown of Stara Zagora

Total built-up area:1 700 sq.m.

Time for completion:October 2009 - December 2009

Chain of Supermarkets “LIDL” across the country:Plovdiv, Stara Zagora, Petrich, Sofia, Sliven, Rousse, Bourgass

Supermarket “LIDL”,Town of Sliven:

Total built-up area:1 700 sq.m.

Time for completion:December 2011 – April 2012

Page 9: Ais brochure en print 2014

08

Construction of more than 50 retail stores to the oil stations with gas stations acrossBulgaria:

Commercial complex with petrol and gas station “OMV”, Blagoevgrad

Commercial complex with petrol and gas station “ОМV-AVANTI“, Petrich

Commercial complex with petrol and gas station “ОМV“, Sofia

Petrol station “ОМV“ – Osikovitsa

Petrol station “Shell Thrakia-South“

Petrol station “Shell Thrakia-Nord“

Petrol Station “Shell“, Pravets

Petrol station“Shell“, Ploski village

Petrol station “Lukoil“, Nessebar

Petrol station “Lukoil”, Stara Zagora

Full modernization of OMV petrol base in Vidin

Time for completion:May 2010 – August 2010

Page 10: Ais brochure en print 2014

09

Residential complex “Byala Cherkva”,Simeonovo district, Sofia

Total built-up area:15 000 sq.m.

Time for completion:I stage: March 2006 - December 2006; II stage: February - November 2007; III stage: May 2007 - July 2008;IV stage: April 2009 – May 2010

Specific features:The complex consists of a nine 3-storey single-family houses with basement garage and parking space. The total built-up area of each house is 270 m2. The homes are equipped with green yard for self-usage with an area of 100 up to 250 m2 and local gas heating.

Private Orthodox church “St. George the Victorious“ is built in the complex.

Orthodox church St. Visarion Smolyanski”, Smolyan

Total built-up area:2 100 sq.m.

Time for completion:August 2004 - July 2006

Specific features:Project execution is characterized with the integration of innovative technologies and traditional construction methods during the execution of the complex architectural design.Seven bells are mounted into the highest part of the bell tower made by special order in Russia, the largest of which weighs 1,650 kg.

Page 11: Ais brochure en print 2014
Page 12: Ais brochure en print 2014

Argoinveststroy

6th fl oor66 Mosfi lmovskaya str.119590 Moskow, RUSSIAN FEDERATIONTel. +7 495 926 92 19

140 Patriarh German str. 1186 Sofia, BULGARIA Tel. +359 2 466 18 43 Fax +359 2 466 18 41

offi [email protected]