Team Structure
Team Lead: Michael Skube – Mechanical Engineer
Co-Team Lead: James Hunt – Mechanical Engineer
Electrical Lead: Joseph Peters – Electrical Engineer
Kevin Li – Electrical Engineer William Atkinson – Mechanical Engineer Heidi Morgan – Electrical Engineer John Isely – Mechanical Engineer
Project Concept Development
• GPS• Velocity• IMU• Altitude• Data Processing
Provide Measuremen
ts for Controlled
Flight
• Interchangeable Sensors• Single Mounting Structure• Low Impact on Airframe
Provide Measurements Package
• Sensor Function• Measurement System
Usage/Implementation• Measurement System Assembly
Provide Documentati
on
Expenses To Date# Item Model Manufacture Part Number QTY Price Shipped
1 Altimeter ZLOG 3 Digital Products #ZLOG3 1 $ 89.95 $ 93.74
2 Data Recorder eLogger V3 Eagle Tree Systems MPRV3-LEADS-100 1 $ 69.99 $ 77.99
3 Altimeter MicroSensor V3 Eagle Tree Systems ALTIMETER-V3 1 $ 37.99 $ 37.99
4 Airspeed MicroSensor V3 Eagle Tree Systems AIRSPEED-V3 1 $ 42.99 $ 42.99
5 Pitot-Static Tube Pitot-Static Tube Kit Eagle Tree Systems PITOT-KIT-V3 5 $ 9.99 $ 49.95
6 Microprocessor SAM7-256 Board Spark Fun Electronics DEV-00774 2 $ 71.95 $ 153.69
7 GPS 32 Chan San Jose Nav. Spark Fun Electronics GPS-08266 1 $ 99.95 $ 99.95
8 Altimeter Ultrasonic Range Finder Spark Fun Electronics SEN-08504 1 $ 27.95 $ 27.95
9 GPS Break Out Board
Lassen iQ Eval Board - USB Spark Fun Electronics GPS-00168 1 $ 34.95 $ 48.88
10 3/16" X 12" X 12" Foam w/ Adhesive Back, SOFT McMaster 86375K151 3 $ 8.17 $ 24.51
11 1/8" X 1/2" 39' Foam w/ Adhesive Back, SOFT McMaster 93275K12 1 $ 15.84 $ 15.84
12 .25" Dia, .057" Thick Vibration Grommet McMaster 9311K138 2 $ 10.27 $ 20.54
13 1/8" X 12" X 12" Foam w/ Adhesive Back, FIRM McMaster 86375K163 3 $ 6.94 $ 20.82
14 1/16" ID, 1/8" OD Silicone Tubing McMaster 51135K11 50 $ 0.41 $ 20.50
15 4-40, 1/8" H Barrel Thread Plate McMaster 90975A002 1 $ 9.01 $ 9.01
16 1/16" Single Barb Tee Fitting McMaster 5116K11 1 $ 2.38 $ 2.38
17 7mm OD, 3.2mm ID Fiber Washer McMaster 95225A315 1 $ 8.35 $ 8.35
18 4-40, 1/2" Length Socket Cap Screw McMaster 92196A110 1 $ 4.26 $ 4.26
# Item Model Manufacture Part Number QTY Price Shipped
19 4-40, 3/4" Length Socket Cap Screw McMaster 92196A113 1 $ 4.52 $ 4.52
20 4-40, 1" Length Socket Cap Screw McMaster 92196A115 1 $ 5.78 $ 5.78
21 1/32" X 12" X 12" PTFE Sheet Gasket McMaster 1063T21 2 $ 7.05 $ 14.10
22 1/16" X 12" X 12" PTFE Sheet Gasket McMaster 1063T22 2 $ 13.94 $ 27.88
23 IMU Analog Devices 1 $ - $ -
24 BOX - MOD01 Initial Release of BOX P09233 - 1 $ 29.50 $ 29.50
25 4 Pack of Bateries AA Radio Shack - 2 $ 2.50 $ 5.00
26 4 Pack of Bateries AAA Radio Shack - 2 $ 2.50 $ 5.00
27 Battery Holder 4X AA Radio Shack - 1 $ 1.79 $ 1.79
28 Battery Clips 9V Radio Shack - 1 $ 2.69 $ 2.69
29 Battery Holder 2X AA Radio Shack - 1 $ 1.69 $ 1.69
30 Battery Holder 3X AAA Radio Shack - 1 $ 1.79 $ 1.79
31 Adapter Plug M Radio Shack - 1 $ - $ -
32 AC Adapter 6V 800Ma AC Radio Shack - 1 $ 22.99 $ 22.99
33 SD Memory Card 1Gb Sandisk - 1 $ 12.99 $ 12.99
34 Binder 1.5" OFFICE DEPOT - 1 $ 7.79 $ 7.79
35 Ready Index 5 Tabs OFFICE DEPOT - 1 $ 2.59 $ 2.59
36 Binder 1.5" (2-Pack) OFFICE DEPOT - 1 $ 5.29 $ 5.29
$ 910.73
Bill of Materials# Item Model Manufacture Part Number QTY Price Shipping Shipped
1 Altimeter ZLOG 3 Digital Products #ZLOG3 1 $ 89.95 $ 3.79 $ 93.74
2 Airspeed MicroSensor V3 Eagle Tree Systems AIRSPEED-V3 2 $ 42.99 $ - $ 85.98
3 Pitot-Static Tube Pitot-Static Tube Kit Eagle Tree Systems PITOT-KIT-V3 2 $ 9.99 $ - $ 19.98
4 Microprocessor SAM7-256 Board Spark Fun Electronics DEV-00774 1 $ 71.95 $ 9.79 $ 81.74
5 GPS 32 Chan San Jose Nav. Spark Fun Electronics GPS-08266 1 $ 99.95 $ - $ 99.95
6 Altimeter Ultrasonic Range Finder Spark Fun Electronics SEN-08504 1 $ 27.95 $ - $ 27.95
7 GPS Break Out Board Lassen iQ Eval Board - USB Spark Fun Electronics GPS-00168 1 $ 34.95 $ 13.93 $ 48.88
8 3/16" X 12" X 12" Foam w/ Adhesive Back, SOFT McMaster 86375K151 1 $ 8.17 $ - $ 8.17
9 1/8" X 1/2" 39' Foam w/ Adhesive Back, SOFT McMaster 93275K12 1 $ 15.84 $ - $ 15.84
10 .25" Dia, .057" Thick Vibration Grommet McMaster 9311K138 12/25 $ 10.27 $ - $ 4.93
11 1/8" X 12" X 12" Foam w/ Adhesive Back, FIRM McMaster 86375K163 1 $ 6.94 $ - $ 6.94
12 1/16" ID, 1/8" OD Silicone Tubing McMaster 51135K11 20 $ 0.41 $ - $ 8.20
13 4-40, 1/8" H Barrel Thread Plate McMaster 90975A002 17/100 $ 9.01 $ - $ 1.53
15 7mm OD, 3.2mm ID Fiber Washer McMaster 95225A315 31/100 $ 8.35 $ - $ 2.59
16 4-40, 1/2" Length Socket Cap Screw McMaster 92196A110 7/100 $ 4.26 $ - $ 0.30
17 4-40, 3/4" Length Socket Cap Screw McMaster 92196A113 7/100 $ 4.52 $ - $ 0.32
18 4-40, 1" Length Socket Cap Screw McMaster 92196A115 7/100 $ 5.78 $ - $ 0.40
19 IMU ADIS 16350 Analog Devices ADIS 16350 1 $ 550.00 $ - $ 550.00
20 BOX - MOD01 Initial Release of BOX P09233 - 1/4 $ 29.50 $ - $ 7.38
21 AC Adapter 6V 800Ma AC Radio Shack - 1 $ 22.99 $ - $ 22.99
22 SD Memory Card 1Gb Sandisk - 1 $ 12.99 $ - $ 12.99
TOTAL $ 1,100.79
Projected Project Costs
Building a second Measurements Box: Total Project Cost: $1900 (includes IMU cost ~$500)
Total Project Cost: $1400 (assumes donated IMU)
Measurements Box BOM: $1100 (includes IMU cost ~$500)
$600 (assumes donated IMU)
The Current Project Cost: $910
Current Risks
Ability to Program the MCU Ability to Interface with the IMU Ability to Test the IMU – MAV Test Stand GPS Calibration Airframe A Flight Testing
Action Items
Program MCU IMU Testing Further Sensor Testing Pitot Static Tube Mounting Design Part Drawings Assembly Instructions Component Documentation
Schedule - SDIITeam Member WEEK 11 FINALS BREAK WEEK 12 WEEK 13 WEEK 14
Michael Skube (TEAM LEAD)
Review Project Status, Meet with team leads, Update EDGE,
Individual Sensor Review, Order new Parts, Finalize SD I
Documents
Complete Documentation, Write Instillation Instructions
Complete Documentation, Write Instillation Instructions
Meet with Team Leads, Update EDGE, System Integration Review Test complete system on Ground Station
James Hunt (TEAM / MECHANICAL
LEAD)
Prepare for Individual Sensor Review, Revisit Sensor Selection
if needed, Continue Testing, Meet with team leads
Complete Documentation, Write Instillation Instructions
Complete Documentation, Write Instillation Instructions
Begin Testing Complete Measurements System, Meet with Team Leads Test complete system on Ground Station
Joseph Peters (ELECTICAL LEAD)
Prepare for Individual Sensor Review, Revisit Sensor Selection
if needed, Continue Testing, Meet with team leads
Complete Documentation, Program Microcontroller Program Microcontroller Begin Complete System Integration,
Meet with Team Leads Test complete system on Ground Station
Kevin LiPrepare for Individual Sensor
Review, Revisit Sensor Selection if needed, Continue Testing,
present testing results
Complete Documentation, Program Microcontroller Program Microcontroller Begin Complete System Integration Test complete system on Ground Station
Heidi MorganPrepare for Individual Sensor
Review, Revisit Sensor Selection if needed, Continue Testing,
present testing results
Complete Documentation, Program Microcontroller Program Microcontroller Begin Complete System Integration Test complete system on Ground Station
John IselyPrepare for Individual Sensor
Review, Revisit Sensor Selection if needed, Continue Testing,
present testing resultsComplete Documentation, Test Sensors Complete Documentation, Test Sensors Begin Complete System Integration Test complete system on Ground Station
William AtkinsonPrepare for Individual Sensor
Review, Revisit Sensor Selection if needed, Continue Testing,
present testing resultsComplete Documentation, Test Sensors Complete Documentation, Test Sensors Begin Complete System Integration Test complete system on Ground Station
Program MCU
Test AltimeterDocument BOX
Build
Test Pitot Static Tube
Part Design
Phase
I S
yst
em
Te
stin
g
Team Member WEEK 15/17 WEEK 16 WEEK 18 WEEK 19 WEEK 20/21/22
Michael Skube
(TEAM LEAD)
Review/Fix/Re-test Complete Measurements System on Ground System,
Meet with other Team LeadsTest complete system on Airframe A, Prepare
for IMAGINE RIT, Begin Design of SD PosterUpdate Documentation, Meet with Team Leads,
Update EDGE, Fly Measurements System and Document Flight, Prepare for IMAGINE RIT
IMAGINE RIT FESTIVAL
Finalize All Documentation, Update EDGE, Team Lead Meeting
James Hunt
(TEAM / MECHANICAL LEAD)
Review/Fix/Re-test Complete Measurements System on Ground System,
Meet with other Team LeadsTest complete system on Airframe A, Prepare
for IMAGINE RIT, Begin Design of SD PosterUpdate Documentation, Meet with Team Leads,
Update EDGE, Fly Measurements System and Document Flight, Prepare for IMAGINE RIT
Finalize All Documentation, Update EDGE, Team Lead Meeting
Joseph Peters
(ELECTICAL LEAD)
Review/Fix/Re-test Complete Measurements System on Ground System,
Meet with other Team LeadsTest complete system on Airframe A, Prepare
for IMAGINE RIT, Begin Design of SD PosterUpdate Documentation, Meet with Team Leads,
Update EDGE, Fly Measurements System and Document Flight, Prepare for IMAGINE RIT
Finalize All Documentation, Update EDGE, Team Lead Meeting
Kevin Li Review/Fix/Re-test Complete Measurements System on Ground System,
Test complete system on Airframe A, Prepare for IMAGINE RIT, Begin Design of SD Poster
Update Documentation, Update EDGE, Fly Measurements System and Document Flight,
Prepare for IMAGINE RITFinalize All Documentation, Update EDGE
Heidi Morgan Review/Fix/Re-test Complete Measurements System on Ground System,
Test complete system on Airframe A, Prepare for IMAGINE RIT, Begin Design of SD Poster
Update Documentation, Update EDGE, Fly Measurements System and Document Flight,
Prepare for IMAGINE RITFinalize All Documentation, Update EDGE
John Isely Review/Fix/Re-test Complete Measurements System on Ground System,
Test complete system on Airframe A, Prepare for IMAGINE RIT, Begin Design of SD Poster
Update Documentation, Update EDGE, Fly Measurements System and Document Flight,
Prepare for IMAGINE RITFinalize All Documentation, Update EDGE
William Atkinson Review/Fix/Re-test Complete Measurements System on Ground System,
Test complete system on Airframe A, Prepare for IMAGINE RIT, Begin Design of SD Poster
Update Documentation, Update EDGE, Fly Measurements System and Document Flight,
Prepare for IMAGINE RITFinalize All Documentation, Update EDGE
Schedule - SDII
Refine Programmi
ngDocumenta
tion
Documentation
Drawings
Ph
ase
II S
yst
em
Te
stin
g
Fin
al
Docu
men
tati
on