Upload
jaycee-pineda-quiambao
View
220
Download
0
Embed Size (px)
Citation preview
8/18/2019 Airframe Construction and Repair
1/17
AIRFRAME CONSTRUCTION AND REPAIR
PREPAIRED BY: Dale Adrian S. LutchiangRandrrick Pineda
8/18/2019 Airframe Construction and Repair
2/17
Riveting
Two Major t!e" o# Ri$eting Solid "hank ri$et"
S!ecial ri$et"
8/18/2019 Airframe Construction and Repair
3/17
Solid Shank Rivets
Solid Shank Rivets: which %u"t &e dri$en u"ing an air dri$en ri$et gun and&ucking &ar. The"e are u"ed widel during a""e%&l and re!air work.
The are identi'ed & the %aterial o# which the are %ade( the headt!e( "i)e o# "hank( and te%!er condition.
The %aterial u"ed #or the %ajorit o# "olid "hank ri$et" i" aluminumalloy. The "trength and te%!er condition" o# alu%inu% allo ri$et" are
identi'ed & digit" and letter": **++ %aterial i" de"ignated a" an ,A- ri$et( and ha" no head
%arking.+*/0T allo ri$et i" de"ignated a" a ,D- ri$et and ha" a rai"ed teat on
the head. Two da"he" on a ri$et head indicate a +10T allode"ignated a" a ,DD- ri$et. The **/0T ri$et i" de"ignated a" an ,AD-ri$et( and ha" a di%!le on the head.
2+23 %aterial and i" %arked with a rai"ed cro"" on the ri$et head andindicated a" ,B- de"ignation.
Each t!e o# ri$et i" identi'ed & a !art nu%&er to allow the u"er to"elect the correct ri$et. The nu%&er" are in "erie" and each "erie"re!re"ent" a !articular t!e o# head.
8/18/2019 Airframe Construction and Repair
4/17
SPECIA RI!ETS
Solid ri$et"( the %o"t widel u"ed#a"tener in aircra#t con"truction. So%ee4a%!le o# the"e are the #ollowing:
Blind Ri$et" 5riction0Lock Ri$et"
Mechanical0Lock Ri$et"
6herrMa4 Ri$et" 78uck Ri$et"9
8igh0Strength Pin Ri$et" 8i0Shear Ri$et"
8/18/2019 Airframe Construction and Repair
5/17
"IND RI!ETS
#ten it i" nece""ar to in"tall ri$et"where there i" acce"" to onl one"ide o# the %aterial( a" o!!o"ed to
"olid ri$et" that %eet thi" need.
;TE:
8/18/2019 Airframe Construction and Repair
6/17
FRICTION#OC$ RI!ETS
Made & the Town"end Di$i"ion o# Te4tron(
a!!ro$ed #or aircra#t "tructure. Ma &e u"ed to re!lace a "olid ri$et
in"tance"( &ut nor%all %u"t ha$e adia%eter one "i)e larger than the ri$et itre!lace".
8/18/2019 Airframe Construction and Repair
7/17
FRICTION#OC$ RI!ETS
8/18/2019 Airframe Construction and Repair
8/17
FRICTION#OC$ RI!ETS
To in"tall in a #riction0lock ri$et In"ert it in the !re!ared hole( then gri! and !ull the "errated
"te% with a "!ecial tool.
Thi" !ull" the ta!ered !lug u! into the hollow "hank and
"well" it to #or% the u!"et the head in"ide the "tructure. 6ontinued !ulling "na!" the "te% o= and lea$e" the !lug
in"ide the "hank.
6ut o= the &roken0o= "te% and 'le it >u"h with the ri$ethead. ;ote: !lug i" held in the "hank onl with #riction( it i" !o""i&le that
the $i&ration can "hake it out and weaken the joint. To re%o$e #riction0lock ri$et"( !unch the "te% out o# the
ri$et. ?"ing a drill the dia%eter o# the ri$et "hank( drill thehead and ta! the "hank out o# the "kin with a !ro!erl 'tting!in !unch.
8/18/2019 Airframe Construction and Repair
9/17
MEC%ANICA#OC$ RI!ETS
;or%all a!!ro$ed to re!lace "olid ri$et" on a"i)e0#or0"i)e &a"i" &ecau"e the "tea% i" lockedinto the hollow and it cannot $i&rate out.
A" "trong or "tronger than a "olid ri$et o# the"a%e dia%eter.
A$aila&le with &oth uni$er"al head" and *++degree counter"unk head".
Standard and o$er"i)e dia%eter". Length" %ea"ured in incre%ent" o# *@3 inch. In"talled in the "a%e wa a" the #riction0lock
ri$et.
8/18/2019 Airframe Construction and Repair
10/17
MEC%ANICA#OC$ RI!ETS
8/18/2019 Airframe Construction and Repair
11/17
MEC%ANICA#OC$ RI!ETS
8/18/2019 Airframe Construction and Repair
12/17
C%ERR&MA' RI!ETS( O&MPIC#OC$ RI!ETS( %UC$ RI!ETS
Mechanical0locking &lind ri$et" that area!!ro$ed #or u"e in aircra#t "tructure.
All #unction on the "a%e !rinci!le a" that
de"cri&ed #or the Bul&ed 6herrlock ri$et.
To re%o$e the %echanical0locked ri$et": 5ile the head to weaken the locking ring.
Ta! the "te% out with a !ro!erl 'tting !inch.
Drill through the head o# the ri$et and ta! the"hank out o# the hole with a !in !unch.
8/18/2019 Airframe Construction and Repair
13/17
%I)%#STREN)T% PINRI!ETS Pin ri$et" are a grou! o# #a"tener that
ha$e the "trength o# a &oiled joint &ut arelighter weight and ea"ier to in"tall than a
&olt( and are in"talled in location" wherethe are nit likel to need to &e re%o$ed.
8/18/2019 Airframe Construction and Repair
14/17
%I#S%EAR RI!ETS
8a" a heat0treated allo "teel !in eui$alent or"u!erior in "trength to the A; &olt that it i"a!!ro$ed to re!lace.
The are re%o$ed & "!litting the collar with a
"%all( "har! chi"el and ta!!ing the !in #ro% thehole. To in"tall a 8i0Shear Ri$et:
Ta! !in into a hole that ha" &een drilled and rea%ed to aninter#erence 't.
The gri! length o# the !in %u"t &e "uch that no %ore than*@*3 inch !rotrude" #ro% the %aterial.
A collar i" !laced o$er the end o# the !in and "!ecial ri$et "etin a ri$et gun "wage" the collar down into the groo$e o# the!in.
8/18/2019 Airframe Construction and Repair
15/17
%I)%#STREN)T% PINRI!ETS
8/18/2019 Airframe Construction and Repair
16/17
Ty*es o+ Rivet %eads
8/18/2019 Airframe Construction and Repair
17/17
Installation
Manual with ha%%er and hand"et or&ucking &ar.
Pneu%atic 8a%%er" 8andheld Suee)er" Ri$eting %achine"
Pin 8a%%er( Ri$et Set