Air National Guard Air National Guard LARGE-SCALE LACTATE INJECTION IN A LARGE-SCALE LACTATE INJECTION IN A MILDLY-REDUCING AQUIFER FOR PCE/TCE MILDLY-REDUCING AQUIFER FOR PCE/TCE DECHLORINATION DECHLORINATION James R. Romer ([email protected]), Ken Swain (SAIC, Oak Ridge, TN, USA) Kent S. Sorenson, Jennifer P. Martin (North Wind, Inc., Idaho Falls, ID, USA) Lisa Alvarez-Cohen (University of California, Berkeley, CA, USA) Badrul-Hoda, and Cpt. David L. Kellner (Air National Guard)

Air National Guard · Iron, ppm 2 max

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Air National Guard · Iron, ppm 2 max

Air National GuardAir National Guard

LARGE-SCALE LACTATE INJECTION IN ALARGE-SCALE LACTATE INJECTION IN AMILDLY-REDUCING AQUIFER FOR PCE/TCEMILDLY-REDUCING AQUIFER FOR PCE/TCE

DECHLORINATIONDECHLORINATIONJames R. Romer ([email protected]), Ken Swain (SAIC, Oak Ridge, TN, USA)

Kent S. Sorenson, Jennifer P. Martin (North Wind, Inc., Idaho Falls, ID, USA) Lisa Alvarez-Cohen (University of California, Berkeley, CA, USA)

Badrul-Hoda, and Cpt. David L. Kellner (Air National Guard)

Page 2: Air National Guard · Iron, ppm 2 max

164th Airlift Wing ANG,Memphis International Airport

Bounded tothe South

and East byFederalExpress

Bounded tothe West and

North byMemphis

InternationalAirport

Page 3: Air National Guard · Iron, ppm 2 max

TCE Concentrations In Groundwater

Page 4: Air National Guard · Iron, ppm 2 max

PROJECT OBJECTIVESPROJECT OBJECTIVES

•• To provide low cost, lowTo provide low cost, lowmaintenance reduction inmaintenance reduction inchlorinated solvents at the sourcechlorinated solvents at the source

•• To provide supplemental dataTo provide supplemental datathrough the pilot study for inclusionthrough the pilot study for inclusionin the FS currently being conductedin the FS currently being conducted

Page 5: Air National Guard · Iron, ppm 2 max
Page 6: Air National Guard · Iron, ppm 2 max

SpecificationsSpecifications

SpecificationSpecification TypicalTypicalSodium Lactate, % by wt.Sodium Lactate, % by wt. 60 60 ±± 1.2 1.2 60 60 ±± 0.5 0.5HH22OO 40 40 ±± 1.2 1.2 40 40 ±± 0.5 0.5pHpH 70 70 ±± 0.5 0.5 6.8 6.8 –– 7.2 7.2Color, APHAColor, APHA 25 max25 max 1010Iron, Iron, ppmppm 2 max2 max <5<5Heavy Metals, Heavy Metals, ppmppm 10 max10 max <1<1Specific GravitySpecific Gravity 1.3100-1.34001.3100-1.3400Specific Gravity of Injected Material (4%)Specific Gravity of Injected Material (4%) 1.021.02Chloride, Chloride, ppmppm 500 max500 maxCitrate, Oxalate,Citrate, Oxalate,

Phosphate, Phosphate, TartrateTartrate none detectednone detectedSulfateSulfate none detectednone detectedSugarsSugars none detectednone detectedMethanol, Methyl Esters (Methanol, Methyl Esters (ppmppm)) 250 max250 maxSodium, %Sodium, % 12.3 12.3 ±± 0.2 0.2OdorOdor Practically odorlessPractically odorless

Page 7: Air National Guard · Iron, ppm 2 max

Optimized Well Locations With 3-D Model

Page 8: Air National Guard · Iron, ppm 2 max

Pull-Technique HDPE Burial

Page 9: Air National Guard · Iron, ppm 2 max

Pull-Technique HDPE Burial

Page 10: Air National Guard · Iron, ppm 2 max

Heat Fusion Coupling

Page 11: Air National Guard · Iron, ppm 2 max

Na Lactate Drop Tube

Page 12: Air National Guard · Iron, ppm 2 max

Potable Water Source

Page 13: Air National Guard · Iron, ppm 2 max

Mixers for Homogenous 1% Solution

Page 14: Air National Guard · Iron, ppm 2 max

Distribution Header For Optimal System Control

Page 15: Air National Guard · Iron, ppm 2 max

Food-grade Na Lactate

Page 16: Air National Guard · Iron, ppm 2 max

First InjectionFirst Injection

•• Confirmation of mixingConfirmation of mixing•• Calibration of pumping rates forCalibration of pumping rates for

each welleach well•• Monitoring of MoundingMonitoring of Mounding

–– Injection wells (9 to 19 ft ) 38 ftInjection wells (9 to 19 ft ) 38 ft–– Monitoring wells (0.75 to 6.25 ft)Monitoring wells (0.75 to 6.25 ft)

Page 17: Air National Guard · Iron, ppm 2 max

Anticipated ScheduleAnticipated Schedule

First injection – May, 2002

Post completion technical memorandum – June 20, 2002

Second injection – July, 2002

Third injection – September, 2002

Fourth injection – November, 2002

Post-treatment sampling– January, 2003

Follow up sampling – March, 2003

End of 1-yr pilot study – May, 2003

End of year report – June, 2003*Pre-injection sampling will be conducted 1wk prior to each injection

Page 18: Air National Guard · Iron, ppm 2 max

System Monitoring SamplingSystem Monitoring Sampling

•• 9 injection wells and 6 monitoring wells9 injection wells and 6 monitoring wellssampled (2 additional MW side- and down-sampled (2 additional MW side- and down-gradient for Sept. sampling)gradient for Sept. sampling)

•• Distribution, Chemical Reduction, & Distribution, Chemical Reduction, & RedoxRedox•• AnalysesAnalyses

–– Field measuredField measured•• Ferrous Iron, alkalinity, temperature, pH, specificFerrous Iron, alkalinity, temperature, pH, specific

conductance, conductance, dissdiss. oxygen, oxidation reduction. oxygen, oxidation reductionpotentialpotential

–– LaboratoryLaboratory•• Chlorinated Chlorinated ethenesethenes, , etheneethene/ethane/methane,/ethane/methane,

chemical oxygen demand, lactate,chemical oxygen demand, lactate,acetate/propionate/butyrate, sulfate, phosphate,acetate/propionate/butyrate, sulfate, phosphate,ammonia as nitrogen, carbon dioxideammonia as nitrogen, carbon dioxide

Page 19: Air National Guard · Iron, ppm 2 max

COD Distribution

July 2002July 2002 Nov. 2002Nov. 2002 Jan. 2003Jan. 2003

Page 20: Air National Guard · Iron, ppm 2 max

Sept. 2002Sept. 2002 Nov. 2002Nov. 2002 Jan. 2003Jan. 2003

RedoxRedox Conditions Conditions

Page 21: Air National Guard · Iron, ppm 2 max

Redox Redox Conditions, March 2003Conditions, March 2003

Page 22: Air National Guard · Iron, ppm 2 max

Analytical Results for Monitoring Wells OutsideAnalytical Results for Monitoring Wells Outsidethe Target Treatment Areathe Target Treatment Area

Page 23: Air National Guard · Iron, ppm 2 max

Molar Concentrations in System MonitoringMolar Concentrations in System MonitoringWellsWells

Page 24: Air National Guard · Iron, ppm 2 max

Molar Concentrations from Pre-injection Hot Spots inMolar Concentrations from Pre-injection Hot Spots inthe Shallow and Deep Portions of the Water Tablethe Shallow and Deep Portions of the Water Table

AquiferAquifer

Page 25: Air National Guard · Iron, ppm 2 max

VOCs VOCs in IW-5 (a) and 03-020mw (b)in IW-5 (a) and 03-020mw (b)

Page 26: Air National Guard · Iron, ppm 2 max

Injection Area TCE Concentrations >500 Injection Area TCE Concentrations >500 ugug/L/L

July 02 Sept. 02

Jan. 03

Page 27: Air National Guard · Iron, ppm 2 max

ConclusionsConclusions

Nine months of monitoring during lactate injection in a large-scaleNine months of monitoring during lactate injection in a large-scalemildly reducing aquifer indicate thatmildly reducing aquifer indicate that

•• The injection system successfully delivered significantThe injection system successfully delivered significantquantities of an electron donor throughout the treatment area.quantities of an electron donor throughout the treatment area.

•• MethanogenicMethanogenic conditions were achieved throughout the conditions were achieved throughout thetreatment area.treatment area.

•• StoichiometricStoichiometric ARD to ARD to ciscis-DCE was observed throughout the-DCE was observed throughout thetreatment area.treatment area.

•• Baseline DNA screening indicated the absence of DHE in siteBaseline DNA screening indicated the absence of DHE in sitegroundwater prior to electron donor injection.groundwater prior to electron donor injection.

•• The absence of advanced ARD beyondThe absence of advanced ARD beyond ciscis-DCE may be a result-DCE may be a resultof insufficient time for biomass growth, or may be due to theof insufficient time for biomass growth, or may be due to theabsence of the organisms required for advanced ARD. Futureabsence of the organisms required for advanced ARD. Futureactivities include continued monitoring (including DHEactivities include continued monitoring (including DHEmonitoring) to determine ifmonitoring) to determine if bioaugmentation bioaugmentation is required in order is required in orderto achieve complete ARD toto achieve complete ARD to ethene ethene..