Upload
walid-saif
View
216
Download
0
Embed Size (px)
Citation preview
8/12/2019 Ahmed Hamdi C V (2)
1/4
Ahmed Hamdi Abd El Rafe'Address:7 Tag El Din Mohammed St., Ain Shams, Cairo
Cell Phone:010 63036343
Home Telephone:02 2293!6!E-mail" eng.ahmedhamdi22#hotmail.$om
1. OBJECTIVE:
See%ing a &osition as an ele$tri$al engineer 'or a re&(ta)le $om&an* in +hi$h m* s%ills,
a)ilities, e&erien$e and a$ademi$ )a$%gro(nd $an )e +ell (tili-ed and deelo&ed in a
+a* that ens(res the $om&an*/s s($$ess.
2. ACADEIC BAC!"RO#$D:
2000 200!
a$helor o' Ele$tri$al o+er Engineering Ma$hines De&artment Mono('ia 5niersit*
She)in El ome8.
rade" ood
ro:e$t rade" E$ellent
Ta)r* Al ;ega- Se$ondar* S$hool.
3. E%PERIE$CE:
1
8/12/2019 Ahmed Hamdi C V (2)
2/4
ro:e$ts"
i. Hori/on all + 0)h1e))lemen) + $e2 Cairo
As Site Engineer s(&erising all o' Bire Alarm, @ighting, So(nd, o+er and
Earthing =or%s 'or the entire )(ilding.
ii. all of Arabia + 3)hof O*)ober Ci)4
As Site Engineer in the 'ollo+ing stores"
>@eis Tim)erland ?o$%&ort eo (i$%siler ans
S(&erising all o' Bire Alarm, @ighting, o+er and So(nd =or%s.
iii. 1#$CIT5 all + 1hera)on + Cairo
As Site Engineer in the 'ollo+ing stores"
>Bort(ne Magra)* Momen Ma%ani ?esta(rant ?eem El a+adi?esta(rant A ?esta(rant Faia ?esta(rant
S(&erising all o' Bire Alarm, @ighting, o+er and So(nd =or%s.
3 Goem)er 2009 till
8/12/2019 Ahmed Hamdi C V (2)
3/4
?e&ort a$$(rate I(antities 'or la)or $ost re&ortsJ a$$(ratel* monitor material
ledgers to determine i' I(antities remaining in the estimate are s(''i$ient to
$om&lete the &ro:e$t in the 'ield.
Coordinate ins&e$tions +ith $ons(ltants and a(thorities as reI(ired.
Kns&e$t 'alse +or% 'or $on'orman$e to design dra+ings.
Contin(all* (&date dra+ings +ith $hanges as iss(ed )* H+nerLCons(ltants.
Ens(re ele$tri$al +or% $om&lies +ith all engineering standards, $odes,
s&e$i'i$ations and design instr($tion.
A)ilit* to read &lansLdra+ings and deelo& As(ilts.
4 De$em)er 200! till Se&tem)er 2009
=or%ing at TADACom&an* >Km&ort E&ort Contra$tor Designing and ee$(ting lo+ and medi(m ele$tri$al net+or%s +hi$h in$l(des"
load $al$(lations, distri)(tion )oards 8C. and '(ses >;.?8, $a)les,
trans'ormer and earthing s*stems.
ro:e$ts done6#nder )he s,per&ision of E4p)ian Armed 9or*es Enineerin
Depar)men) - anaemen) 1e*)or"
i. Knstalling the ele$tri$al net+or% 'or the Maadi Ksland.
ii. Kn$reasing e''i$ien$* o' 8&rinting ho(se8 )* $hanging its trans'ormer )* larger one.
iii. Maintenan$e 'or di''erent distri)(tion )oards.
i. ani S+ai' gates lighting >Ge+ 5&&er Eg*&t ?oad.
. El ;aiaa ?esort in ?as Sedr installation o' a $om&lete ele$tri$al net+or% in$l(ded
>Trans'ormer, Main Distri)(tion oard, and S() Distri)(tion oard, Et$.
i. @o+ medi(m oltages net+or% in !thSettlement Ge+ Cairo.
ii. Com&leting lighting net+or% * solar Energ* in ostol &ort in As+an
4. COP#TER 1!I1:
Bamiliar +ith the 'ollo+ing &rograms"
1 A(to Cad.
2 Mi$roso't H''i$e >=ord E$el.
8/12/2019 Ahmed Hamdi C V (2)
4/4
!. 1!I1 :
1 A)ilit* to +or% (nder &ress(re.
2 A)ilit* to learn I(i$%l*.3 E$ellent Comm(ni$ation S%ills.
6. A$"#A"E:
Arabi*:Mother Tong(e
Enlish:ood
7. PER1O$A DATA:
Da)e of Bir)h: 12.11.193
$a)ionali)4: Eg*&tian
ari)al 1)a),s: Single
ili)ar4 1)a),s: Eem&ted
Referen*es and Cer)ifi*a)es ;ill Be 9,rnished #pon Re