AGENDA SANTA MARGARITA WATER DISTRICT ENGINEERING AND OPERATIONS COMMITTEE MEETING MAY 14, 2021 TELECONFERENCE Conference Phone Number: +1 530-414-9890 Audio Conference Code: 297 129 673# CALL TO ORDER: 8:00 AM COMMITTEE CHAIR: Frank Ury COMMITTEE MEMBER: Justin McCusker COVID-19 COMMUNICATIONS MESSAGE: In an effort to protect the safety of the District and our customers, and in compliance with Executive Order N-29-20 and N-33-20, members of the Board of Directors and District Employees may attend this meeting via teleconference. Members of the public have the opportunity to provide comments during Public Forum, submit comments in writing via mail to Cindy Lane, Administrative Analyst at 26111 Antonio Parkway, Rancho Santa Margarita, CA 92688, or by email to [email protected]. 1. PUBLIC FORUM Persons wishing to address the Committee are requested to submit a "Request To Be Heard" form to the Recording Secretary. Comments are limited to three minutes, unless further time is granted by the Presiding Officer. 2. CONSENT CALENDAR 2.1 Consideration and Action on Award of Construction Contract for Chiquita Water Reclamation Plant Digester 2 Coating, C-1241U.013 Page 3 Recommendations: 1) Authorize awarding a construction contract to Murphy Industrial Coating, Inc. for the Chiquita Water Reclamation Plant Digester 2 Coating Project in the amount of $296,444. 2.2 Consideration and Action on Project Acceptance for Construction of Secondary Clarifier No. 3 at the Chiquita Water Reclamation Plant (CWRP) for the Secondary Treatment Expansion, Contract C-1241T.012E Page 6 Recommendation: Accept the work performed by Kingmen Construction, Inc. (KCI) for the CWRP Secondary Clarifier No. 3 project, C-1241T.012E, file Notice of Completion (NOC), and release retention no later than 60 days after the Notice of Completion has been filed, provided no claims have been filed with the District and that the Punch List items have been completed.

AGENDA SANTA MARGARITA WATER DISTRICT …

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: AGENDA SANTA MARGARITA WATER DISTRICT …

AGENDA

SANTA MARGARITA WATER DISTRICT

ENGINEERING AND OPERATIONS

COMMITTEE MEETING

MAY 14, 2021

TELECONFERENCE

Conference Phone Number: +1 530-414-9890

Audio Conference Code: 297 129 673#

CALL TO ORDER: 8:00 AM

COMMITTEE CHAIR: Frank Ury

COMMITTEE MEMBER: Justin McCusker

COVID-19 COMMUNICATIONS MESSAGE: In an effort to protect the safety of the District and our customers, and in compliance with Executive Order N-29-20 and N-33-20, members of the Board of Directors and District Employees may attend this meeting via teleconference. Members of the public have the opportunity to provide comments during Public Forum, submit comments in writing via mail to Cindy Lane, Administrative Analyst at 26111 Antonio Parkway, Rancho Santa Margarita, CA 92688, or by email to [email protected].

1. PUBLIC FORUM

Persons wishing to address the Committee are requested to submit a "Request To Be Heard"

form to the Recording Secretary. Comments are limited to three minutes, unless further time

is granted by the Presiding Officer.

2. CONSENT CALENDAR

2.1 Consideration and Action on Award of Construction Contract for Chiquita Water

Reclamation Plant Digester 2 Coating, C-1241U.013 Page 3

Recommendations: 1) Authorize awarding a construction contract to Murphy

Industrial Coating, Inc. for the Chiquita Water Reclamation Plant Digester 2

Coating Project in the amount of $296,444.

2.2 Consideration and Action on Project Acceptance for Construction of Secondary

Clarifier No. 3 at the Chiquita Water Reclamation Plant (CWRP) for the Secondary

Treatment Expansion, Contract C-1241T.012E Page 6

Recommendation: Accept the work performed by Kingmen Construction, Inc.

(KCI) for the CWRP Secondary Clarifier No. 3 project, C-1241T.012E, file

Notice of Completion (NOC), and release retention no later than 60 days after the

Notice of Completion has been filed, provided no claims have been filed with the

District and that the Punch List items have been completed.

Page 2: AGENDA SANTA MARGARITA WATER DISTRICT …

2 | P a g e

2.3 Consideration and Action on Addenda for Butier Engineering, Inc., and GMU

Geotechnical, Inc. for the Trampas Canyon Dam & Reservoir, Contract No. C-1773

Page 10

Recommendation: 1) Approve Addendum No. 3 for Butier Engineering, Inc.

(BEI) in the amount of $94,800 for construction management services on The

Trampas Reservoir Project; 2) Ratify Addendum No. 4 for GMU Geotechnical,

Inc. (GMU) in the amount of $49,632.50 for geotechnical services on the

Trampas Reservoir project.

3. ACTION ITEMS RECOMMENDED BY COMMITTEE

3.1 Consideration and Action on Purchase of Camera Video Inspection Van Page 22

Recommendation: Authorize purchase of camera video inspection van from

Plumbers Depot Inc for $243,500.

3.2 Consideration and Action on Award of Construction Contract for CWRP Influent Lift

Station Force Main Replacement, C-1241U.004A Page 24

Recommendations: 1) Authorize awarding a construction contract to Kingmen

Construction, Inc. for the Chiquita Water Reclamation Plant Influent Lift Station

Phase 3 Force Main Replacement Project in the amount of $622,900; 2) Increase

the FM Project Budget to $750,000.

4. INFORMATION ITEMS

4.1 Engineering Department Update for Period Ending April 30, 2021 Page 28

4.2 Operations Department Update for Period Ending April 30, 2021 Page 39

4.3 Engineering and Operations Committee Notes – April 16, 2021 Page 43

ITEMS DISTRIBUTED TO THE COMMITTEE LESS THAN 72 HOURS PRIOR TO

MEETING

Pursuant to Government Code section 54957.5, non-exempt public records that relate to open

session agenda items and are distributed to a majority of the Members less than seventy-two

(72) hours prior to the meeting will be available for public inspection in the lobby of the

District’s business office located at 26111 Antonio Parkway, Rancho Santa Margarita,

California 92688, during regular business hours. When practical, these public records will

also be made available on the District’s Internet Web Site, accessible at

http://www.smwd.com.

Upon request, this agenda will be made available in appropriate alternative formats to

persons with disabilities, as required by Section 202 of the Americans with Disabilities Act of

1990. Any person with a disability who requires a modification or accommodation in order to

participate in a meeting should direct such request to Kelly Radvansky, Secretary to the

Board of Directors, at (949) 459-6642 at least 48 hours before the meeting if possible.

Page 3: AGENDA SANTA MARGARITA WATER DISTRICT …

MEMORANDUM

TO: Engineering and Operations Committee DATE: May 14, 2021

FROM: Tricia Butler

SUBJECT: Consideration and Action on Award of Construction Contract for Chiquita Water

Reclamation Plant Digester 2 Coating, C-1241U.013

SUMMARY:

Recommendations: 1) Authorize awarding a construction contract to Murphy Industrial

Coating, Inc. for the Chiquita Water Reclamation Plant Digester 2 Coating Project in the amount

of $296,444.

Issue: The District has completed the design and bid process for the CWRP Digester 2 Interior

Coating/Rehabilitation planned Capital Repair and Replacement project. This agenda item

recommends award of the construction contract to complete the work.

Fiscal Impact: The recommended contractor bid is $296,444 for the Scope of Work. The total

project cost estimate is $400,000 and includes other project-related costs. This project was

budgeted in the Capital Replacement Program for $400,000 as project CHIQT2204C for

completion in FY2021- FY2022. The District will use a portion of the proceeds from the 2020A

Revenue Bonds to fund the project.

Previously Related Action: The Board approved the CRP budget in May 2020.

Adherence to Policy: The Digester 2 Interior Coating/Rehabilitation work is consistent with the

District’s Business Plan Goal “To Provide Quality, Uninterrupted Service,” and the Core

Objective Category “Water Quality Standards and All Environmental Compliancy Goals are Met

or Exceeded Continuously.” This facility is an essential treatment process to meet regulatory

requirements for the reuse/disposal of sludge generated at the Chiquita WRP.

Anticipated Board Action: This item is anticipated to be brought to the Board of Directors

meeting on June 2, 2021 for consideration as a Consent Calendar item.

2.1

Packet Pg. 3

Page 4: AGENDA SANTA MARGARITA WATER DISTRICT …

Figure 2 – Digester 2 coating close up (left), piping/appurtenant equipment (right)

Overall in Excellent Condition

DISCUSSION:

The digesters at the CWRP process sludge

produced in the wastewater treatment process.

Digester 2 (see Figure 1) was constructed with

Phase 1 of the treatment plant around 1986.

Harper and Associates completed a condition

assessment to determine the scope of work

required to rehabilitate the interior coating and

other appurtenant equipment. The required

scope is primarily coating removal and

replacement on the inside of the tank. Current

conditions are shown in Figure 2.

The project was advertised for bids on Monday, April 5, 2021 to six contractors pre-selected by

the District. Three potential bidders attended the mandatory pre-bid meeting. National Coating &

Lining contacted the District on the day of the bid to advise that they would not be bidding the

project.

The bids were received and opened on April 30. Murphy Industrial Coating and Lining Co.

(Murphy) Inc. submitted a bid of $296,444 along with the required bid documents and is

considered a responsible bidder. The Engineer’s Estimate for the project was $300,000. A

summary of bids is provided in Table 1.

Table 1 – Digester 2 Coating Summary of Bids

Bidder Bid

Murphy Industrial Coating, Inc $ 296,444

F.D. Thomas, Inc $ 300,237

National Coating and Lining No Bid

Engineer’s Estimate $ 300,000

Figure 1 - Digester No. 2

2.1

Packet Pg. 4

Page 5: AGENDA SANTA MARGARITA WATER DISTRICT …

Staff recommends award of the construction contract to Murphy Industrial Coating, Inc. in the

amount of $ 296,444.

PROJECT COST AND FUNDING:

Total project costs are presented in Table 2.

Table 2 – Digester 2 Interior Coating and Rehabilitation Project Budget

ItemJune 2021

BudgetComments

Construction Contract $296,444 Bid received April 30, 2021

Harper and Assoc. Tech Services $43,000 Condition Assessment, design, inspection

District Provided Materials $20,000 Valve replacements and repair matls

District Labor and Admin Cost $20,000 Cleaning, repairs

Contingency $20,556

Project Total $400,000 Budget 

The total project cost is proposed to be funded using a portion of the proceeds from the 2020A

Revenue Bonds. The project was approved by the Board as part of the 2020 Capital Repair and

Replacement Program with a budget of $400,000. The project is being tracked in Munis under

code CHIQT2204C.

2.1

Packet Pg. 5

Page 6: AGENDA SANTA MARGARITA WATER DISTRICT …

MEMORANDUM

TO: Engineering and Operations Committee DATE: May 14, 2021

FROM: Jeff McDonnell, Don Bunts

SUBJECT: Consideration and Action on Project Acceptance for Construction of Secondary

Clarifier No. 3 at the Chiquita Water Reclamation Plant (CWRP) for the

Secondary Treatment Expansion, Contract C-1241T.012E

SUMMARY:

Recommendation: Accept the work performed by Kingmen Construction, Inc. (KCI) for the

CWRP Secondary Clarifier No. 3 project, C-1241T.012E, file Notice of Completion (NOC), and

release retention no later than 60 days after the Notice of Completion has been filed, provided no

claims have been filed with the District and that the Punch List items have been completed.

Issue: All work on this project has been completed satisfactorily and it is ready for acceptance

by the District.

Fiscal Impact: The proposed CWRP Secondary Treatment Upgrades estimated cost is

$17.8 million. The overall project funding is split between the District ($6.2 million) and new

development ($11.6 million). The new development funding will be RMV’s responsibility in

accordance with a Reimbursement Agreement (under development). The agreement proposes to

have the District fund the project to meet its timeline and be reimbursed, including interest, from

future development bond funds.

Previously Related Action: At the SMWD 2020 Annual Strategic Planning Workshop held

February 21st, the Board supported the CWRP Secondary Treatment Upgrades as a “Need to Do

Project.” On April 17, 2020, the Board approved the pre-purchase of the Clarifier No. 3 Sludge

Collector System from Ovivo USA, LLC. On June 19, 2020, the Board awarded the

construction contract to KCI for the amount of $3,315,457.

Adherence to Policy: Construction of the work adheres to the SMWD Design Criteria and

Standard Drawings for Water and Sewer Facilities.

Anticipated Board Action: This item is anticipated to be brought to the Board of Directors

meeting on June 2, 2021 for consideration as a Consent Calendar Item.

2.2

Packet Pg. 6

Page 7: AGENDA SANTA MARGARITA WATER DISTRICT …

DISCUSSION:

Increased flow capacity and redundancy was required in the secondary treatment process at

CWRP to address the needs of the District and to accommodate the increase in flows associated

with the build out of Rancho Mission Viejo (RMV). As part of the odor control project the

trickling filters were removed from the treatment process. This has required all of the flow to be

put through the existing two aeration basins and their associated two secondary clarifiers.

While the plant was capable of handling the flows, there was no redundancy with either process

in the case of equipment failure or scheduled outages required for maintenance. With the

construction of Secondary Clarifier No. 3, to be followed with the addition of two new Aeration

Basins No. 3 & 4, the necessary redundancy will be achieved. In addition, these two construction

projects will fulfill the additional treatment capacity to support the future growth.

Construction on this project has progressed and completed smoothly with very few

complications. The pre-purchase of the Secondary Clarifier No. 3 Sludge Collector System and

Return Activated Sludge (RAS) Pump No. 3 was successfully completed by the District and

made available to the Contractor for installations before the construction sequence required it.

The Contingency bid item on this project was chiefly used to construct the Return Activated

Sludge (RAS) No. 3 Pump Station that was not included in the original project design but

necessary for the full operation of Secondary Clarifier No. 3. The District began Beneficial Use

of the Clarifier and its appurtenances and commissioned it starting on 08APR21.

Upon the commissioning of new Secondary Clarifier No. 3, existing Secondary Clarifier No. 4

has been taken out of service and inspected for necessary maintenance and repairs. It is

anticipated that a project to refurbish existing Clarifier No. 4 will be implemented in the near

future.

The photo in Figure 1 below provides an overview of the new Clarifier No. 3 System as

construction was nearing completion in mid-March 2021. Existing Clarifier No. 4 is shown in

the background.

2.2

Packet Pg. 7

Page 8: AGENDA SANTA MARGARITA WATER DISTRICT …

KCI has constructed the project successfully with the quality and timeliness that are

commensurate with District standards, and will maintain its good standing on the SMWD lists of

prequalified contractors.

Table 1 presents the final Kingmen Construction Contract Cost.

Table 1 – Kingmen Construction, Inc. – Contract Summary

Description Cost % Change

Original Contract $3,315,457.00

Change Order No. 1 $ 78,118.00

Revised Contract $3,393,575.00 2.4%

Figure 1 – CWRP Secondary Clarifier No. 3

2.2

Packet Pg. 8

Page 9: AGENDA SANTA MARGARITA WATER DISTRICT …

Table 2 presents the total project cost including the construction contract cost and related costs.

Table 2 – Secondary Clarifier 3 Final Cost Summary

Description Cost Notes

Sludge Collector $332,559 Purchase Order 22001996

RAS Pump VFD $16,840 Purchase Order 22100654

Electrical Equpment $16,931 One Source

Construction Mgmt/Testing $90,000 Geotechnical

Design Sub-Consultants $82,000 Structural, CAD

Administrative Cost $210,000 From Munis, 1/2020 - 4/2021 labor,

benefits, reprographics

General Contractor $3,393,575 Kingmen

Total Cost $4,141,906

FUNDING SOURCE

Funding for the secondary clarifier portion of the work is proportionally split between District’s

requirement for redundancy which is funded through the Esencia CFD (~33.3 percent) and

requirements for expansion to meet new development projections (66.7 percent). The new

development funding will be RMV’s responsibility in accordance with a reimbursement

agreement (under development). The agreement proposes to have the District fund the project to

meet its timeline and be reimbursed with interest from future development bond funds.

Project funding for the secondary expansion was tracked under MUNIS code CHIQT1402C.

2.2

Packet Pg. 9

Page 10: AGENDA SANTA MARGARITA WATER DISTRICT …

MEMORANDUM

TO: Engineering and Operations Committee DATE: May 14, 2021

FROM: Jeff McDonnell, Don Bunts

SUBJECT: Consideration and Action on Addenda for Butier Engineering, Inc., and GMU

Geotechnical, Inc. for the Trampas Canyon Dam & Reservoir, Contract No. C-

1773

SUMMARY:

Recommendation: 1) Approve Addendum No. 3 for Butier Engineering, Inc. (BEI) in the

amount of $94,800 for construction management services on The Trampas Reservoir Project;

2) Ratify Addendum No. 4 for GMU Geotechnical, Inc. (GMU) in the amount of $49,632.50 for

geotechnical services on the Trampas Reservoir project.

Issue: Additional funds are needed for construction support consultants for construction

management and geotechnical services. These additional costs have been necessitated by the

extension of the project beyond December 2020, the need for assistance in inspections associated

with filling of the Trampas Dam, and the complexity of solving the problems with regard to the

West Saddle Dam and Piezometer Systems.

Fiscal Impact: Funding of the primary project will be from a $15 million State Water

Resources Control Board Grant, a $96 million 1% Interest Loan, new development funding,

potential partners, Rancho Mission Viejo (RMV), and District New Capital Project Reserves.

Previously Related Action: The Board awarded contract Addendum No. 2 to BEI on

06NOV19, and Addendum No. 3 to GMU on 05AUG20.

Adherence to Policy: This project helps meet the District’s goal of recycling 100% of its

wastewater and reduces demands on the imported domestic water system.

Anticipated Board Action: This item is anticipated to be brought to the Board of Directors

meeting on June 2, 2021 for consideration as a Consent Calendar Item.

2.3

Packet Pg. 10

Page 11: AGENDA SANTA MARGARITA WATER DISTRICT …

DISCUSSION:

BEI Additional Costs for the Reservoir/Dam:

Completion of the remaining work and Punch List items by Sukut, and review of miscellaneous

change order requests continued through 2020 and remains ongoing. Based on all information

available, the District recommends that BEI stay engaged on the project in a detailed fashion, but

on a part-time basis until the end of June 2021. After that time, assistance by BEI should be

more sporadic and minimal in nature. Butier’s last contract addendum was issued in November

of 2019 and assumed project completion in December 2020.

The District is taking more aggressive steps in concluding the change order negotiation process

with Sukut, and expects that all remaining issues, and positions on those issues to be fully

disclosed and agreed upon by approximately the end of May 2021. This would allow for the

greatest portion of the final processing of change orders and job closeout proceedings to happen

in June 2021.

As an expansion to the services provided by BEI, they are currently offering assistance in the

daily inspection of the Dam while it is being filled. This inspection and reporting process of the

Dam is required by DSOD as a condition of the Permit to Operate. This activity is a two-person

operation, requiring approximately 6 manhours per day during the normal work week, and

10 manhours per day on weekends and holidays. This requirement will remain in effect until the

Dam is completely filled, or until DSOD deems that such inspections can be reduced or

otherwise adjusted. BEI is currently providing one Inspector to assist during the week and

compiling the report documents to provide to DSOD monthly. The District Inspectors are

covering all other work shifts on this item. This activity will be monitored and re-evaluated at

the end of June 2021 to consider any needed staffing changes to promote further efficiencies.

BEI has provided a proposal for this supplemental work which has been included in attached

Exhibit A. Below is the summary cost from that proposal and a Contract Summary.

BEI Addendum No. 3 Summary:

Final Inspections, Reporting and Contract Closeout Services in 2021: $ 55,830

Assistance in the Inspection and Reporting on Filling of the Dam: $ 38,970

Proposed Addendum No. 3: $ 94,800

BEI Contract Summary:

Description Cost

Original Contract $2,665,380.00

Addendum No. 1 $373,685.00

Addendum No. 2 $1,313,276.00

Addendum No. 3 $94,800.00

Total $4,447,141.00

2.3

Packet Pg. 11

Page 12: AGENDA SANTA MARGARITA WATER DISTRICT …

Additional Services by GMU Geotechnical:

The largest portions of the additional contributions made by GMU during the latter stages of the

Work consisted of two of the larger technical problems experienced on the whole project:

• Structural Integrity of the West Saddle Dam Cut Off Wall.

• Successful Construction and Operation of the Piezometer Level Measuring System.

The West Saddle Dam portion of the project differs in design as compared to the Main Dam and

the East Saddle Dam in that the core involves the use of an integral cut off wall comprised of a

special lightweight concrete (slurry) that would prevent any leakage at all from passing through

the body of the West Dam. For the Main Dam and the East Dam, engineered layers of special

sands and gravels allow for a very small amount of leakage to pass through those massive

structures in a measurable and controllable fashion that can be monitored, and do not have a cut

off wall.

When the West Dam Cut Off wall was originally placed in the field, samples of the slurry used

were taken for laboratory testing. When all the laboratory testing was completed, and the reports

provided, it was recognized that one-third of the structure showed failing results. A red flag was

raised and several weeks ensued wherein the District, all the consultants, and DSOD worked to

find a solution. Ultimately a complex procedure was developed to core drill and extract

specimens from the wall that was in place, and to test those specimens. Fortunately, those

specimens tested with favorable results, and it could be concluded that the original samples were

flawed and could be ignored. The cut off wall will therefore not have to be demolished and

reconstructed. GMU played a very large part in developing the remedial procedures and did a

large part of the laboratory testing and reporting involved.

The Piezometer Level Measuring System problems were among the largest challenges on the

project. This system involves eleven wells with level measuring instruments installed within

them at various locations on the Main Dam and East Dam embankments. The instruments

measure water levels in the dam to assure they are within safe engineered limits required in the

project design.

In synopsis, five of the eleven Piezometer wells that were installed required reconstruction.

Three have been determined to be the responsibility of the District, and two are the responsibility

of the Contractor. This is a large subject of change order negotiations with the Contractor at this

time.

It took many months for DSOD to agree to a proper procedure for the reconstruction. Once

DSOD agreed to such procedures, it was time consuming and costly to construct and implement

them. Subsequently, DSOD was very involved in reviewing the validity of the data that was

being produced by the System resulting in many weeks of investigating, reporting, and

conferencing. Ultimately, the data was verified to be compliant with the design requirements

and the System was allowed to be commissioned. GMU’s contribution to developing the work

2.3

Packet Pg. 12

Page 13: AGENDA SANTA MARGARITA WATER DISTRICT …

procedures, and sampling and analysis of the water level data was a major component in

achieving success on the Piezometer Level Measuring System.

Both of the above issues were immensely important to DSOD. All revised work procedures and

the resulting data produced was subject to the review and approval of DSOD.

Please see attached Exhibit B provided by GMU proposing a budget increase of $49,632.50 for

geotechnical services to assist in resolving the above challenges.

GMU Contract Summary:

Description Cost

Original Contract $1,257,666.00

Addendum No. 1 $1,326,818.00

Addendum No. 2 $17,915.00

Addendum No. 3 $249,064.00

Addendum No. 4 $49,632.50

Total $2,901,095.50

FUNDING SOURCE

Funding of the primary project will be from a $15 million State Water Resources Control Board

Grant, $96 million 1% Interest Loan, new development funding, potential partners, Rancho

Mission Viejo (RMV) and District New Capital Project Reserves.

2.3

Packet Pg. 13

Page 14: AGENDA SANTA MARGARITA WATER DISTRICT …

17782 E. 17th St.Suite 107

Tustin, CA 92780Tel (714) 832-7222Fax (714) 832-7211

May 3, 2021

Mr. Jeff McDonnell, P.E.Santa Margarita Water District26111 Antonio ParkwayRancho Santa Margarita, CA 92688

Subject: Amendment No. 3 Construction Management Services for the Trampas Canyon Dam and Reservoir.

SMWD: Project No. C-1773 SMWD: PO No. 360974

Dear Mr. McDonnell:

The Butier Team was engaged June 30, 2017 to perform Construction Management and Inspection services for the above referenced project. Purchase Order 360974 was received in early July 2017 and NTP was issued concurrently. Amendment No.1 was executed on December 13, 2017 for $373,685. Amendment No. 2 was executed on November 15, 2019 for $1,313,276.

Since the issuance of Amendment No.2, the contract period of performance has increased by approximately 7 months based on actual completion dates of critical path activities. Approximately three (3) months of additional Contract duration is directly tied to weather related impact. The remaining construction duration can be attributed to various Contractor imposed and supplier delays. It is believed that several concurrent delays occurred beyond the approximate 3 additional months of weather delays, however since the last official project schedule update was provided in May 2020, there is no clear explanation of additional time supported by the Contractor’s CPM schedule.

Due to staff adjustments related to the construction management of the Trampas Recycled Water Pump Station, a significant amount of budget was spared and available for use for the remaining Trampas onsite staff. Additionally, the inspection and management staff were diligent in conserving budgeted hours where possible to assist in overall cost efficiency. This allowed the current budget to extend further than originally anticipated and is the reason why this additional request has been minimized.

The rate structure associated with this request is as follows and mirrors the structure already in place:

Resident Engineer: $170 per hour

Field Construction Manager: $145 per hour

Technical Support/Document Control: $105 per hour

We are requesting and additional $ 94,800.00 with justification as follows:

Tasks listed below are numbered in accordance with the fee schedule provided as a part of this request:

2.3.a

Packet Pg. 14

Att

ach

men

t: C

-177

3 T

ram

pas

Dam

Ad

m 3

_BE

I_G

MU

_SR

_jm

_Exh

A.d

oc

(C

-177

3 T

ram

pas

Dam

Co

nsu

ltan

ts A

dd

end

a)

jeffm
Text Box
EXHIBIT A
Page 15: AGENDA SANTA MARGARITA WATER DISTRICT …

17782 E. 17th St.Suite 107

Tustin, CA 92780Tel (714) 832-7222Fax (714) 832-7211

Task 1- Project Management/ Administration (Butier Engineering): Increases in the project schedule due to weather and other Contractor delays: Additional hours are necessary to provide Project Management and Contract Administration to facilitate project closeout activities. The hours illustrated below include all management and administrative efforts required to facilitate the necessary Contract closeout activities for the project. An additional 295 hours were added to the total labor effort for the Resident Engineer for comprehensive administrative closeout to include: change order processing and financial accounting, closeout deliverable review and completion, and Contract file organization and deliverables. 32 hours were added for Technical Support/Document Control personnel for support for such proceedings. An additional 16 hours were added for the Field Construction Manager for possible assistance during the closeout period for any site inspections or follow up inspections.

Change Request:

Resident Engineer: 295 Hours @ $170.00: $ 50,150

Field Construction Manager: 16 Hours @ $ 145.00: $2,320

Technical Support: 32 Hours @ $105.00: $ 3,360

Subtotal for this task item: $55,830.00

Task 2- Project Management/ Administration (Butier Engineering): Support for Reservoir Filling Efforts: SMWD requests that Butier provide initial inspection services during the first 2 months of reservoir filling to ensure compliance with the DSOD approved fill plan. This effort allows SMWD personnel to become familiar with the site and the inspections necessary during the fill stage of the reservoir. For safety reasons, there will always be two (2) people required onsite during the inspections. The hours illustrated below constitute the labor effort necessary to provide first fill inspections in accordance with DSOD and AECOM guidelines as well as training for SMWD personnel for efforts moving forward. An additional 250 hours were added for Field Construction Manager (Inspector) to provide the necessary fill inspections for approximately 3 months if needed. An additional 16 hours were added for the Resident Engineer in the event coverage in place of the Field Construction Manager is needed.

Change Request:

Field Construction Manager: 250 @ $145.00: $36,250

Resident Engineer: 16 Hours @ $170.00: $ 2,720

Subtotal for this task item: $38,970.00

Butier Engineering emphasizes that the above estimated costs are our best estimate given our knowledge at the time this request was submitted and is considered a reasonable estimate. As always, Butier Engineering will not exhaust all funds remaining in the PO at the completion of the Contract unless absolutely necessary.

If you have any questions regarding the attached proposal, please contact me at (714) 832-7222.

Sincerely,

2.3.a

Packet Pg. 15

Att

ach

men

t: C

-177

3 T

ram

pas

Dam

Ad

m 3

_BE

I_G

MU

_SR

_jm

_Exh

A.d

oc

(C

-177

3 T

ram

pas

Dam

Co

nsu

ltan

ts A

dd

end

a)

Page 16: AGENDA SANTA MARGARITA WATER DISTRICT …

17782 E. 17th St.Suite 107

Tustin, CA 92780Tel (714) 832-7222Fax (714) 832-7211

BUTIER Engineering, Inc.Construction Managers, Consulting Engineers

Mark M. Butier, Jr.Vice President/CFO

Enclosures: Exhibit 1; BEI Fee Sched_Added Closeout Serv_Trampas Dam

2.3.a

Packet Pg. 16

Att

ach

men

t: C

-177

3 T

ram

pas

Dam

Ad

m 3

_BE

I_G

MU

_SR

_jm

_Exh

A.d

oc

(C

-177

3 T

ram

pas

Dam

Co

nsu

ltan

ts A

dd

end

a)

Page 17: AGENDA SANTA MARGARITA WATER DISTRICT …

COST PROPOSAL; EXHIBIT 1SMWD: Additional closeout CM Services for Trampas Canyon Dam and Reservoir

2021Task 1 Firm Rate April May June July August September October November Per Category Per Category Total Cost Project Administration (Closeout)

Resident Engineer E. Weber Butier $ 170.00 90.0 90.0 90.0 25.0 0.0 0.0 0.0 0.0 295.0 $ 50,150.00Field Construction Manager C. Lack Butier $ 145.00 8.0 8.0 0.0 0.0 0.0 0.0 0.0 0.0 16.0 $ 2,320.00Field Support Document Control K. Squires Butier $ 105.00 16.0 16.0 0.0 0.0 0.0 0.0 0.0 0.0 32.0 $ 3,360.00

$ 55,830.00Task 2 Firm April May June July August September October November Per Category Per Category Total Cost Reservoir Filling Support

Resident Engineer E. Weber Butier $ 170.00 4.0 4.0 8.0 0.0 0.0 0.0 0.0 0.0 16.0 $ 2,720.00Field Construction Manager C. Lack Butier $ 145.00 70.0 90.0 90.0 0.0 0.0 0.0 0.0 0.0 250.0 $ 36,250.00Field Support Document Control K. Squires Butier $ 105.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 $ -

$ 38,970.00Rate April May June July August September October November Per Category Per Category Total Cost

Total Man-Hours Per Month

Resident Engineer E. Weber Butier $ 170.00 94.0 94.0 98.0 25.0 0.0 0.0 0.0 0.0 311.0 $ 52,870.00Field Construction Manager C. Lack Butier $ 145.00 78.0 98.0 90.0 0.0 0.0 0.0 0.0 0.0 266.0 $ 38,570.00Field Support Document Control K. Squires Butier $ 105.00 16.0 16.0 0.0 0.0 0.0 0.0 0.0 0.0 32.0 $ 3,360.00Total Proposed Project Costs $ 94,800.00

2.3.a

Packet Pg. 17

Att

ach

men

t: C

-177

3 T

ram

pas

Dam

Ad

m 3

_BE

I_G

MU

_SR

_jm

_Exh

A.d

oc

(C

-177

3 T

ram

pas

Dam

Co

nsu

ltan

ts A

dd

end

a)

Page 18: AGENDA SANTA MARGARITA WATER DISTRICT …

February 12, 2021

Mr. Jeff McDonnell

SANTA MARGARITA WATER DISTRICT

26111 Antonio Parkway

Rancho Santa Margarita, CA 92688 GMU Project No. 18-001-10

Subject: Request for Budget Increase, Geotechnical and Materials Testing

Services for Construction of the SMWD Trampas Canyon Dam

and Reservoir, Orange County, California

References: Our “Supplemental Proposal for Geotechnical and Materials Testing

Services for Construction of the SMWD Trampas Canyon Dam and

Reservoir . . . . ,” dated June 18, 2020 (GMU Project 18-001-10)

Dear Mr. McDonnell:

GMU is submitting this proposed budget increase for the construction support services for the

Trampas Canyon Dam and Reservoir (Trampas Dam) project.

GMU’s remaining contract amount is currently at $1,442.50. GMU’s January invoice only

included partial services complete during the month of January. Our costs for the additional

services completed during January 2021 and through the 1st week of February (i.e., January 2021

through February 5, 2021) amounted to $20,550.00, which results in a net amount of $19,107.50

we are currently holding for billing.

GMU’s request for a budget increase is needed due to performing work outside our scope of

work and associated costs outlined in our referenced supplemental proposal for the project.

OUT OF SCOPE SERVICES COMPLETED THROUGH FEBRUARY 5, 2021

The out-of-scope services GMU performed through February 5, 2021 and associated costs are as

follows:

• West Saddle Dam (WSD) Cutoff Trench. Samples collected on July 1, 2020 (Day 3 of

construction) were tested and yielded inadequate strength and hydraulic conductivity tests

results. In order to complete the access road grading and to provide data to support

conformance to the project specifications, the contractor was required to obtain additional

samples for project conformance testing. This additional coring effort was performed in

2 days as described below:

o August 8, 2020 to obtain samples from the top of the trench to determine if the fill

could be placed above the cutoff trench to complete the access road grading.

o December 22, 2020 to obtain a continuous core through the cutoff trench to

collect samples for lab testing.

2.3.b

Packet Pg. 18

Att

ach

men

t: C

-177

3 T

ram

pas

Dam

Ad

m 3

_BE

I_G

MU

_SR

_jm

_Exh

B.d

oc

(C

-177

3 T

ram

pas

Dam

Co

nsu

ltan

ts A

dd

end

a)

jeffm
Text Box
EXHIBIT B
Page 19: AGENDA SANTA MARGARITA WATER DISTRICT …

Mr. Jeff McDonnell, SANTA MARGARITA WATER DISTRICT

Request for Budget Increase: Geotechnical and Materials Testing Services for Construction of

SMWD Trampas Canyon Dam and Reservoir

February 12, 2021 2 GMU Project 18-001-10

Our field services and laboratory testing associated with the WSD coring efforts (i.e.,

field and lab testing) along with the project meetings, discussions and review of proposed

drilling and sampling methods we were requested to participate in amounted to $10,289.

• Main Dam Piezometers: Installation of four (4) new piezometers, decommissioning of

one and repair of another at the Main Dam was required for the project due to the

following:

o water levels being measured in existing piezometers (OS-4 an OS-5) where water

was not anticipated

o an obstruction in one of the piezometers (OS-3)

o one piezometer (OS-1) needing to be redrilled due to original design resulting in a

depth that drilled through the top of the drainage blanket (i.e., piezometers within

the shell embankment were to have a tip elevation above the drainage system).

o repair of a piezometer (OS-8), which had a separation in the pipe at about 7 feet

below grade

The services associated with the above installation, decommissioning, and repair were

accounted for in our referenced supplemental proposal. However, the services outlined

below were not included in our of scope of work.

o Prior to drilling of the new piezometers, GMU was requested to bail piezometers

OS-4 and OS-5 and perform a video survey of the 8 piezometers (OS-1 through

OS-8) located within the Main Dam shell embankment. Due to the small

diameter pipe (i.e., 1¼” I.D.) a special camera was required.

GMU contracted with a video survey company to provide the necessary services. The

costs associated with these services amounted to $7,524 of which $6,200 was paid

directly by GMU to video survey company.

o After the drilling of the new piezometers, water levels were noted in new

piezometers. GMU was requested to provide the following additional services

between November 9, 2020 through February 5, 2021.

o The piezometer services included multiple site visits to take measurements and

bail the piezometers, download and interpret transducers placed in 3 of the

piezometers for AECOM’s evaluation, prepare summary tables and graphs for

AECOM and BEI following each of our site visits, and participate in discussions

and meetings with AECOM, BEI and DOSD.

The costs of the additional services related to the measuring, bailing, downloading and

interpretation of transducer data, preparation of the summary tables and graphs, and

participation in discussions and meetings related to the piezometers amounted to $28,681.

2.3.b

Packet Pg. 19

Att

ach

men

t: C

-177

3 T

ram

pas

Dam

Ad

m 3

_BE

I_G

MU

_SR

_jm

_Exh

B.d

oc

(C

-177

3 T

ram

pas

Dam

Co

nsu

ltan

ts A

dd

end

a)

Page 20: AGENDA SANTA MARGARITA WATER DISTRICT …

Mr. Jeff McDonnell, SANTA MARGARITA WATER DISTRICT

Request for Budget Increase: Geotechnical and Materials Testing Services for Construction of

SMWD Trampas Canyon Dam and Reservoir

February 12, 2021 3 GMU Project 18-001-10

Miscellaneous Items Related to Access Road, WSD Riprap, and Punch List Items:

o GMU’s field technician was required to spend additional hours at the project due

to the following:

▪ Re-working of the access road subgrade soils at the ESD cul-de-sac area due

to wet soils the contractor tried to compact without allowing them to dry out.

This additional work occurred on a Saturday and resulted in overtime costs.

▪ Geotechnical oversight during removal of the contractor’s ingress/ egress

ramps to the reservoir bottom.

▪ Placement of bedding materials and rip rap materials on the WSD slope face

after removal of a contractor’s access ramp.

These miscellaneous tasks, which amounted to ~50 hours of engineering technician and

~6 hours of geologist time, were absorbed in the hours allocated for the project and

therefore, no additional costs were realized.

The out-of-scope tasks, as related to the WSD cutoff trench the Main Dam piezometers,

amounted to a total of $46,494.

TASKS/COSTS REMAINING TO COMPLETE

Based on discussions with yourself, BEI, and AECOM, regarding our as-built project reports and

our involvement with initial portion of the project Fill Up Plan prepared by AECOM (i.e., 10 site

visits to manually measure piezometers prior to and during initial filling of the reservoir and

office services needed to compile and send out the data to the project team), we anticipate the

following costs are needed to close out the construction and initial fill up phase of the project:

• Amount Remaining in Contract: ($ 1,442.50)

• Amount not billed through February 5, 2021: $ 20,550.00

• Piezometer Readings and Reporting

(assumes 40 hours field and 15 hours office services): $ 8,025.00

• Reports (Non DSOD Facilities submitted week of February 8, 2021,

(DSOD Facilities report scheduled for March 31, 2021) $ 22,500.00

TOTAL COSTS REQUESTED TO COMPLETE REMAINING TASKS: $49,632.50

2.3.b

Packet Pg. 20

Att

ach

men

t: C

-177

3 T

ram

pas

Dam

Ad

m 3

_BE

I_G

MU

_SR

_jm

_Exh

B.d

oc

(C

-177

3 T

ram

pas

Dam

Co

nsu

ltan

ts A

dd

end

a)

Page 21: AGENDA SANTA MARGARITA WATER DISTRICT …

Mr. Jeff McDonnell, SANTA MARGARITA WATER DISTRICT

Request for Budget Increase: Geotechnical and Materials Testing Services for Construction of

SMWD Trampas Canyon Dam and Reservoir

February 12, 2021 4 GMU Project 18-001-10

EXCLUSIONS

This proposal does not include the monitoring and inspection services that will continue beyond

those outlined above for the initial fill up activities along with the required inspection reports

associated with these activities. GMU can prepare a separate proposal at a later date for these

services.

We propose to continue providing our services as outlined in this proposal on a time-and-

expense basis in accordance with our approved 2016 Schedule of Charges, which will be used

for the duration of the project, even as it extends into 2021. In the event that the scope of work is

increased beyond that described in this proposal, the budget estimate provided above will not be

exceeded without your prior authorization. GMU will continue to report our project time on a

weekly basis with a breakdown of staff classifications, manhours, and tasks.

We appreciate the opportunity to be part of this project and will continue to make every effort to

provide our services in the most efficient manner possible. We welcome the opportunity to meet

with you to discuss the details of this request for budget increase. Please do not hesitate to call

with any questions in the meantime.

Respectfully submitted,

GMU GEOTECHNICAL, INC.

Alan “Bob” Mutchnick

Engineering Geologist/Project Manager

Aron Taylor, M.S., PG, CEG

Principal Engineering Geologist

Cc: Butier Engineering

Attn. Mr. Eric Weber (Project RE)

/02-12-21_18-001-10 Request for Budget Increase_Trampas Dam-Reservoir

2.3.b

Packet Pg. 21

Att

ach

men

t: C

-177

3 T

ram

pas

Dam

Ad

m 3

_BE

I_G

MU

_SR

_jm

_Exh

B.d

oc

(C

-177

3 T

ram

pas

Dam

Co

nsu

ltan

ts A

dd

end

a)

Page 22: AGENDA SANTA MARGARITA WATER DISTRICT …

MEMORANDUM

TO: Engineering and Operations Committee DATE: May 14, 2021

FROM: Daniel Peterson

SUBJECT: Consideration and Action on Purchase of Camera Video Inspection Van

SUMMARY:

Recommendation: Authorize purchase of camera video inspection van from Plumbers Depot

Inc for $243,500.

Issue: In order to accommodate the maintenance of an additional 125+ miles of wastewater

pipeline as part of the City of San Juan Capistrano annexation, the District needs to add an

additional camera video inspection van.

Fiscal Impact: The proposed vehicle is included in the FY2022 Capital Expenses budget for

San Juan Capistrano. Due to the long lead time to produce this vehicle, this item is being

brought to the Board ahead of time.

Previously Related Action: The District authorized the execution of the Annexation Agreement

with the City of San Juan Capistrano on January 17, 2020.

Adherence to Policy: This project is consistent with the District’s mission to “Provide a high

level of service with maximum cost effectiveness.”

Anticipated Board Action: This item is anticipated to be brought the Board of Directors

meeting on May 21, 2021 for consideration as an Action Item Recommended by Committee.

DISCUSSION:

The District’s Collections crew is responsible for maintaining more than 630 miles of wastewater

pipeline. As part of these maintenance practices, sewer lines are inspected utilizing a specialized

vehicle that can send a remote-controlled camera into the sewer line and take live video of the

condition of the pipeline. This information can be invaluable in identifying potential blockages,

debris, or other hazards within the pipeline.

3.1

Packet Pg. 22

Page 23: AGENDA SANTA MARGARITA WATER DISTRICT …

As part of the acquisition of the City of San Juan Capistrano’s water and wastewater systems, the

District’s wastewater system will increase by 20%. In order to accommodate the addition of this

mileage, the District budgeted for the addition of 3 pieces of heavy equipment: a combination

unit, a jetter, and a CCTV truck. The City currently utilizes contract services for video inspection

services that costs $0.72 per linear foot. The District estimates that it’s cost to perform the same

work is approximately $0.62 per linear foot.

There are three primary vendors who provide the hardware necessary for video inspections:

Cues, Aries, and Envirosight. The District currently operates one video inspection truck that

utilizes the Cues hardware. The camera and video hardware are proprietary and will not work

with other vendors hardware. Because of this, staff recommendation is to sole source this

purchase and procure the new vehicle that uses the Cues hardware. Rather than have two

different types of video inspection hardware and software that would not work with each other,

having both units be the same hardware will reduce downtime and maintenance issues.

3.1

Packet Pg. 23

Page 24: AGENDA SANTA MARGARITA WATER DISTRICT …

MEMORANDUM

TO: Engineering and Operations Committee DATE: May 14, 2021

FROM: Tricia Butler, Jeff McDonnell

SUBJECT: Consideration and Action on Award of Construction Contract for CWRP Influent

Lift Station Force Main Replacement, C-1241U.004A

SUMMARY:

Recommendations: 1) Authorize awarding a construction contract to Kingmen Construction,

Inc. for the Chiquita Water Reclamation Plant Influent Lift Station Phase 3 Force Main

Replacement Project in the amount of $622,900; 2) Increase the FM Project Budget to $750,000.

Issue: The District has completed the design and bid process for the CWRP Influent Lift Station

Phase 3 Force Main Replacement planned Capital Repair and Replacement project. This agenda

item recommends award of the construction contract to complete the work.

Fiscal Impact: The recommended contractor bid is $622,900 for the Scope of Work. The total

project cost estimate is $750,000 and includes other project-related costs. This project was

budgeted in the Capital Replacement Program for $500,000 as project CHIQT2500C for

completion in FY2021- FY2022. The District will use a portion of the proceeds from the 2020A

Revenue Bonds to fund the project.

Previously Related Action: The Board approved the CRP budget in May 2020.

Adherence to Policy: The Force Main Replacement Project is consistent with the District’s

Business Plan Goal “To Provide Quality, Uninterrupted Service,” and the Core Objective

Category “Water Quality Standards and All Environmental Compliancy Goals are Met or

Exceeded Continuously.”

Anticipated Board Action: This item is anticipated to be brought to the Board of Directors

meeting on May 21, 2021 for consideration as an Action Item Recommended by Committee.

3.2

Packet Pg. 24

Page 25: AGENDA SANTA MARGARITA WATER DISTRICT …

DISCUSSION:

In 2014, the Chiquita Water Reclamation Plant

Influent Lift Station “Phase 3 Pump Station” Force

Main experienced a failure requiring an emergency

sewage bypass and pipe repair. The pipe manifold

immediately downstream of the pumps, as shown in

Figure 1, was eroded through and was replaced in

2014. The District planned to replace the remaining

downstream pipeline once the screening facility

design concepts and site improvements were

developed in conjunction with the concepts for

added redundancy and flexibility for pipeline

inspection and maintenance.

This current project replaces approximately 160 feet of 36-inch diameter pipe, along with

valving and provisions for new connections to the forthcoming upgrades of the original influent

lift station.

The project was advertised for bids on April 14, 2021 to three contractors pre-selected by the

District. Three potential bidders and two bypass pump sub-contractors attended the mandatory

pre-bid meeting. The bids were received and opened on May 5, 2021. Kingmen Construction

submitted a bid of $622,900 along with the required bid documents and is considered a

responsible bidder. A summary of bids is provided in Table 1.

Table 1 – Digester 2 Coating Summary of Bids

No. Description Qty Engineer

Estimate

Leather-

wood

Kingmen Shoffeitt

1 Mobilization/Demobilization LS 25,000$ 80,000$ 15,000$ 30,000$

2 Potholing/Survey LS 25,000$ 25,000$ 12,000$ 45,000$

3 Remove Existing 36” Pipe LS 45,000$ 40,000$ 50,000$ 42,000$

4 Provide & Install New 36” Pipe

w/fittings

LS 165,000$ 425,000$ 348,108$ 450,000$

5 Civil/Site Work LS 30,000$ 32,000$ 14,000$ 20,000$

6 Bypass Pump System LS 150,000$ 86,500$ 105,000$ 125,000$

7 Three 24-hour periods of bypass

pump operation

LS 16,200$ 18,792$ 19,800$

8 Contingency LS 60,000$ 60,000$ 60,000$ 60,000$

Total 500,000$ 764,700$ 622,900$ 791,800$

Bid Results of CWRP ILS Ph 3 Force Main Replacement

Figure 1 – Pump Manifold

Replaced in 2014

3.2

Packet Pg. 25

Page 26: AGENDA SANTA MARGARITA WATER DISTRICT …

The Engineer’s Estimate for the project was $500,000. All three bids received were higher than

the engineer’s estimate, and the low bid was approximately 23 percent lower than the next

higher bid.

During the bid period, questions and feedback from the bypass pump supply companies resulted

in the addition of inclusion of operational costs for three days of bypass pumping, and a flanged

connection to the bypass pump system that will also facilitate the future rehabilitation of the

existing original influent lift station pump station. These costs account for an estimated $50,000

of the bid cost that was not included in the engineer’s estimate.

The most significant difference between the engineer’s estimate and the bids is the cost of the

provision and installation of the 36-inch pipe. The engineer’s estimate assumed a unit cost of

approximately $1,000 per foot. This unit cost is higher than the unit cost of other project actual

unit costs for this size of pipeline in this geographical area. However, this project is unique with

160 feet of pipe as compared to typical projects with thousands of feet of pipe. The 36-inch

diameter size is larger than a size pipe that would typically be stocked by pipe suppliers. The

cost of setting up for production of a limited length of pipe drives up the unit cost of the pipe.

The current market setting is that construction materials are in limited supply and the

construction industry is in high demand. These factors contributed to the actual bids being higher

than the estimated cost.

Kingmen’s bid was lower than the other bids by a significant margin. Kingmen is mobilized and

working currently on the Aeration Basin construction project at the Chiquita Water Reclamation

Plant, providing economies in the mobilization for this project. Kingmen also realized some

savings in their approach to the pipeline provision and construction, as well as the bypass

pumping.

Staff recommends award of the construction contract to Kingmen Construction in the amount of

$ 622,900.

3.2

Packet Pg. 26

Page 27: AGENDA SANTA MARGARITA WATER DISTRICT …

PROJECT COST AND FUNDING:

Total project costs are presented in Table 2.

Table 2 – CWRP ILS Phase 3 Force Main Replacement Project Budget

ItemJune 2021

BudgetComments

Construction Contract $622,900 Bid received May 5, 2021

Prepurchase 36-in & 30-in PLVs $56,000 Quotes

Other District provided materials $20,000 Gates, misc materials

District Labor and Admin Cost $25,000 Bypass pumping, outage assistance

Contingency $26,100

Project Total $750,000 Budget 

The total project cost is proposed to be funded using a portion of the proceeds from the 2020A

Revenue Bonds. The project was approved by the Board as part of the 2020 Capital Repair and

Replacement Program with a budget of $500,000. The revised project budget is $750,000. Staff

will attempt to identify a possible savings equivalent to the $250,000 increase through other

projects. The project is being tracked in Munis under code CHIQTC1102C.

3.2

Packet Pg. 27

Page 28: AGENDA SANTA MARGARITA WATER DISTRICT …

MEMORANDUM

TO: Engineering and Operations DATE: May 14, 2021

FROM: Tricia Butler

SUBJECT: Engineering Department Update for Period Ending April 30, 2021

SUMMARY:

Refer to attached Engineering Department Update for the period ending April 30, 2021.

4.1

Packet Pg. 28

Page 29: AGENDA SANTA MARGARITA WATER DISTRICT …

ENGINEERING UPDATE

Progress and status of engineering department work is described in this report for the period ending

April 30, 2021.

FACILITY PLANNING AND DESIGN EFFORTS

Engineering staff completed in-house planning and design work, and managed work by consultants.

A few highlights in ongoing work are as follows:

Project Lead Project

Eng / Sub-

Consultants

Current phase /

Comments

Const Contract

Award Rec to

Board

Ranch WTP, C-1792;

RWTPT3000C

SMWD Pre-Design in progress Budget

Coto de Caza LS Emerg. Storage,

C-1322C; COTOS7103C

Psomas Bidding June 2021

CWRP Dig 2 Coating,

C-1241U.013; CHIQT2204C

SMWD

Harper and

Associates

Bidding May 2021

CWRP Ph 3 Force Main Rehab,

C-1241T.004A; CHIQT2500C

SMWD Bidding May 2021

CWRP Sec. Clarifier 4 Rehab,

C-1241U.014; CHIQT1403CC

Harper, assess

& design

Assessment in progress June 2021

Rienda Lift Station Design,

C-1787; RNDAS7100C

Psomas Bidding June 2021

CWRP ILS Screenings

Equipment Prepurchase, C-

1241.004, CHIQT1102C

Huber or FSM Prepurchase Equipment July 2021

Reservoir Coating

C-1176.12, ESTD45501C

C-1690E.1, TLGA2550C

C-1223F, PLNO45501C

C-1229.09, FOOT35500C

C-1111A, ALIC3550C

C-1679N, TLGAA6500C

SMWD

Harper and

Associates,

Rich Kissee

Design Underway July 2021

Rienda Pressure Reduce. Facility

Design, C-1791; RNDA15400C

Lee and Ro Final Design July 2021

CWRP Infl LS/Screening Proj,

C-1241T.004; CHIQT1102C

HDR

Engineering

Final Design August 2021

CWRP Yard Piping Replacement

(gas piping), C-1241U.003

TBD Preliminary Design Design Sept

2021

Send/Esencia Cathodic Protection

C-1650G/H; SEND_5300C;

SEND6300C; ESEN_5300C

MBI Final Design Oct 2021

4.1.a

Packet Pg. 29

Att

ach

men

t: 2

021-

04A

prE

gr-

Dep

t (

Eg

r D

ept

Rep

ort

fo

r P

erio

d E

nd

ing

04-

30-2

021)

Page 30: AGENDA SANTA MARGARITA WATER DISTRICT …

Project Lead Project

Eng / Sub-

Consultants

Current phase /

Comments

Const Contract

Award Rec to

Board

Upper Oso Res Reasphalt,

C-1036.E; UOSO6600C / Upper

Chiq Res Spillway Rd Paving

1543C; UCHQI5501C

AECOM Assessment to be

followed by design

Oct 2021

Las Flores RW Pipeline,

C-1450C; LASF_6000C

SMWD Design in progress TBD

Las Flores RWPS,

C-1639D; LASF_6000C

SWMD Pre-Design in progress TBD

Oso WRP Upgrades and Expan-

sion, C-1035N; OSOCT1401C

SMWD Environmental, RWPS

Design

TBD

RW Zn A Piping Modifications,

C-1772C, ID4CA-62-N-003;

ID5_A-62-N-002

SMWD, TBD Pre-Design August 2021

(tentative)

RW Zn A CWRP Pumps,

CHIQT6100C

SMWD Pre-Design Oct 2021

(tentative)

RW Zn A Sendero Pumps and

MCC, C-1747C, SENDA6100C

SMWD, TBD Pre-Design Oct 2021

(tentative)

CWRP Camera Installation

C-1241T.009, CHIQT0200C

SMWD Design, Construction

Contract auth staff level*

TBD

SC7 New Turnout at Jeronimo

and Obrero, C-1794

ETWD/MNWD Pre-Design Phase,

SMWD providing info

TBD

* Award anticipated at staff level, does not require Board approval.

During March and April, the

District contacted potential

equipment suppliers for the

Chiquita Water Reclamation

Plant Influent Lift Station

Screenings Equipment.

Because the screens will

extend from the lower

channel to the upper level for

a height of approximately

30 feet, it was important to

check references of similar

installations with such

height. The District

conducted virtual reference

checks including installations

in the US, Wales, Germany

and Norway.

4.1.a

Packet Pg. 30

Att

ach

men

t: 2

021-

04A

prE

gr-

Dep

t (

Eg

r D

ept

Rep

ort

fo

r P

erio

d E

nd

ing

04-

30-2

021)

Page 31: AGENDA SANTA MARGARITA WATER DISTRICT …

Secondary Clarifier 4

Photo 1 – Clarifier

mechanism, with suction

sludge collector on bottom

Photo 2 – Top view of drive

mechanism, requires rehab or

replacement

Photo 3 – Overview of

clarifier feedwell, lower

mechanism where seal has

come out, and sludge

collector mechanism

1

2

3

4.1.a

Packet Pg. 31

Att

ach

men

t: 2

021-

04A

prE

gr-

Dep

t (

Eg

r D

ept

Rep

ort

fo

r P

erio

d E

nd

ing

04-

30-2

021)

Page 32: AGENDA SANTA MARGARITA WATER DISTRICT …

Recycled water production and production from the Lake Mission Viejo Advanced Water Treatment

Facility data is presented in the following graph and table.

The Lake Mission Viejo Advanced

Treatment Facility (LMV ATF) operated

throughout April with both reverse osmosis

trains in operation.

Table 1 - LMV ATF Production, Acre-Ft

2018 2019 2020 2021

Jan 6.2 2.7 0.0 22.8

Feb 0.0 0.0 0.0 21.3

Mar 43.8 0.0 38.8 38.8

Apr 39.6 0.0 9.3 42.7

May 44.5 11.8 45.8

Jun 44.7 23.8 48.7

Jul 48.0 25.7 49.1

Aug 39.1 23.8 50.7

Sep 24.5 36.9 47.9

Oct 24.8 49.7 49.5

Nov 23.4 34.9 27.3

Dec 22.4 3.8 24.4

Total 361.2 213.2 391.5 125.6

4.1.a

Packet Pg. 32

Att

ach

men

t: 2

021-

04A

prE

gr-

Dep

t (

Eg

r D

ept

Rep

ort

fo

r P

erio

d E

nd

ing

04-

30-2

021)

Page 33: AGENDA SANTA MARGARITA WATER DISTRICT …

Recycled water production from the Chiquita Water Reclamation Plant and Oso Water Reclamation

Plant are presented in the following tables. Increase in production in April was due in part from higher

demands associated with warmer days, but primarily because any surplus flow is sent to Trampas and

not through the outfall for ocean disposal.

2016 2017 2018 2019 2020 2021

Jan 159 152 148 103 151 154

Feb 108 141 132 142 138 132

Mar 139 150 146 152 159 153

Apr 143 137 138 140 82 149

May 141 143 147 139 152

Jun 132 144 141 123 147

Jul 151 153 147 127 154

Aug 147 142 138 147 154

Sep 144 134 134 140 143

Oct 142 147 131 142 149

Nov 139 143 138 138 144

Dec 141 144 128 153 145

Total 1,684 1,729 1,667 1,645 1,719 588

Mo Ave 140 144 139 137 143 147

Table 2 - Oso Recycled Water Production, Acre-Ft

Ladera Talega Total Ladera Talega Total Ladera+ Talega Total Ladera Talega Total Year Mo. Ave Total

Jan 266 65 331 151 29 180 25 40 65 390 48 439 2014 330 3,959

Feb 343 79 422 26 19 45 219 74 293 233 52 284 2015 328 3,941

Mar 272 47 318 38 17 55 136 45 181 226 60 286 2016 378 4,538

Apr 355 116 472 134 101 235 73 59 132 182 172 354 2017 363 4,355

May 358 129 487 89 86 174 253 132 385 - - - 2018 424 5,087

Jun 334 144 478 243 122 365 303 129 432 - - - 2019 283 3,399

Jul 312 178 491 300 155 455 337 172 510 - - - 2020 364 4,373

Aug 328 161 489 310 155 465 333 183 516 - - - 2021 341

Sep 330 133 463 296 129 425 344 142 486 - - -

Oct 361 108 469 312 121 433 365 119 484 - - -

Nov 281 101 382 328 68 396 355 52 407 - - -

Dec 252 32 284 163 8 170 413 69 482 - - -

Total 3,793 1,294 5,087 2,388 1,011 3,399 3,156 1,217 4,373 1,031 332 1,363

Mo Ave 424 283 364 341

+ In April 2021, SMWD began sending flow to Trampas using the Talega pumps. Talega values include

Talega demand and flow into Trampas. Ladera values include Ladera demands and can include additional

flow to Upper Oso Reservoir if surplus is available.

Table 3 - CWRP Recycled Water Production, Acre-Ft

Annual RW Prod (AF)20212018 2019 2020

4.1.a

Packet Pg. 33

Att

ach

men

t: 2

021-

04A

prE

gr-

Dep

t (

Eg

r D

ept

Rep

ort

fo

r P

erio

d E

nd

ing

04-

30-2

021)

Page 34: AGENDA SANTA MARGARITA WATER DISTRICT …

4.1.a

Packet Pg. 34

Att

ach

men

t: 2

021-

04A

prE

gr-

Dep

t (

Eg

r D

ept

Rep

ort

fo

r P

erio

d E

nd

ing

04-

30-2

021)

Page 35: AGENDA SANTA MARGARITA WATER DISTRICT …

Operation of the 3A WRP transitioned from SMWD to MNWD in March 2019.

MN SM Total MN SM Total MN SM Total MN SM Total Year Mo. Ave Total

Jan 2 0 2 0 0 0 41 0 41 62 0 62 2014 62 745

Feb 0 0 0 12 3 14 0 0 0 0 0 0 2015 103 1,233

Mar 0 108 108 0 68 68 0 0 0 0 0 0 2016 111 1,331

Apr 0 210 210 0 177 177 0 0 0 6 0 6 2017 124 1,491

May 141 77 219 0 0 0 38 0 38 2018 153 1,836

Jun 135 75 210 0 0 0 136 0 136 2019 70 835

Jul 139 79 218 92 0 92 118 0 118 2020 54 653

Aug 139 87 226 115 0 115 156 0 156 2021 17

Sep 134 84 218 128 0 128 122 0 122

Oct 137 87 224 133 0 133 42 0 42

Nov 123 78 201 90 0 90 0 0 0

Dec 0 0 0 19 0 19 0 0 0

Total 950 886 1,836 588 247 835 653 0 653 0

Mo Ave 153 70 54 17

Table 4 - 3A WRP Recycled Water Production, Acre-Ft

Annual RW Prod (AF)20192018 2020 2021

4.1.a

Packet Pg. 35

Att

ach

men

t: 2

021-

04A

prE

gr-

Dep

t (

Eg

r D

ept

Rep

ort

fo

r P

erio

d E

nd

ing

04-

30-2

021)

Page 36: AGENDA SANTA MARGARITA WATER DISTRICT …

CONSTRUCTION ACTIVITY

Construction activity on capital projects; construction observation of RMV infrastructure and

development work related to water and sewer; coordination of encroachment permit work such as

paving improvements; cathodic protection system monitoring; and underground utility markouts

(USA Digalert) kept the department busy this month. The following is an overview of ongoing capital

projects and the project status.

Project General

Contractor

Current phase /

Comments

Percent Billed

through month

end (%)

CWRP Secondary Clarifier 3,

C-1241T.012E; CHIQT1402C

Kingmen Complete, project

acceptance in May

99.5

CWRP Aeration Basin Expansion,

C-1241T.012E; CHIQT1402C

Kingmen Bottom slab poured in

April

30.9

CWRP Digester Hot Water Piping

Replacement,

C-1241U.010; CHIQT4101C

SMWD,

Karcher

(insulation)

Piping progressing,

Insulation work pending

piping completion

6.2

Island PS/Lakeside PS Surge Tank

Coating, C1233I.07/C1217F;

ISLD45101C/LAKEI5102CSMWD,

Murphy

Industrial

Coatings

Lakeside Surge Tank

defects discovered,

certified repairs

underway

On hold

Cristianitos Creek / So. Co. Pipeline

Vicinity Storm Damage Repairs,

C-1486L.01, SOCN_5202C

JES Permits approved,

completion in May

No billings yet

Pico Recycled Water Pump Station.

C-1494D; PICOA6100C

Kingmen Pump barrels sent back

for coating, back on site,

pump/piping installation

in progress

56.6 (end of

March)

Foothill PS Electrical Upgrades,

C-1515.08; FOOT40200C

Halcyon Replacing lighting,

pending electrical

equipment delivery

6.1

SMWD Headquarters Locker Room,

C-1560O; HEAD_0105C

AGI Pending state review of

project trigged by dual-

plumbed facility

No billings yet

South Ranch Lift Station Upgrades,

C-1656A; SRCHS7100C

Schuler Pre-construction

meeting held,

submittals/review

No billings yet

Trampas Reservoir,

C-1773B; TRMPA6500C

Sukut Reservoir filling, change

order negotiations and

project close out

Under

separate report

Trampas Recycled Water Pump

Station, C-1773 TRMPA6100C

Kingmen Construction Complete,

Pump Testing

99.0

4.1.a

Packet Pg. 36

Att

ach

men

t: 2

021-

04A

prE

gr-

Dep

t (

Eg

r D

ept

Rep

ort

fo

r P

erio

d E

nd

ing

04-

30-2

021)

Page 37: AGENDA SANTA MARGARITA WATER DISTRICT …

Project General

Contractor

Current phase /

Comments

Percent Billed

through month

end (%)

Revegetation

Arroyo Trabuco Bank Erosion Repair

Restoration, 2-Yr Monitoring (Start

2019), C-1669A.07, WAST_7001G

Nakae Maintenance 51.6

Gobernadora 5-year Maintenance

Contract (Start 2017),

C 1685L.01, GOOBB4100C

Nature’s

Image

Maintenance 48.4

Tesoro Reservoirs, Mitigation and

5-year Maintenance Contract (Start

2017), C-1767L.01, TESO20200C

Nature’s

Image

Maintenance 92.6

Trampas Res, Oaks Mitigation and

5-Year Maintenance Contract (Start

2021), C-1773L.01, TRMPA6500C

Nature’s

Image

Maintenance 11.3

Construction Project Photo Highlights:

4 Photo 4 – Concrete Pour, base of the aeration

basins, opening to gallery below in background

Photo 5 – Overview of entire slab approximately

250-ft long x 90-ft wide x 30-ft deep

Photo 6 – Inside gallery looking out toward

aeration basin slab

5 6

4.1.a

Packet Pg. 37

Att

ach

men

t: 2

021-

04A

prE

gr-

Dep

t (

Eg

r D

ept

Rep

ort

fo

r P

erio

d E

nd

ing

04-

30-2

021)

Page 38: AGENDA SANTA MARGARITA WATER DISTRICT …

Photo 7 – Andre Harper of Harper and Associates at Lakeside Surge Tank access hatch (16” x

20” oval opening)

Photo 8 – Site glass nozzle fitting found to be highly corroded and requiring replacement. This

will require repair and likely postponement of the coating project until after the summer months.

7 8

4.1.a

Packet Pg. 38

Att

ach

men

t: 2

021-

04A

prE

gr-

Dep

t (

Eg

r D

ept

Rep

ort

fo

r P

erio

d E

nd

ing

04-

30-2

021)

Page 39: AGENDA SANTA MARGARITA WATER DISTRICT …

MEMORANDUM

TO: Engineering and Operations DATE: May 14, 2021

FROM: Daniel Peterson

SUBJECT: Operations Department Update for Period Ending April 30, 2021

SUMMARY:

Refer to attached Operations Department Update for the period ending April 30, 2021.

4.2

Packet Pg. 39

Page 40: AGENDA SANTA MARGARITA WATER DISTRICT …

Notable Events in April 2021

Allen-McColloch Pipeline shutdown

• The Allen-McColloch Pipeline (AMP) shutdown was

scheduled from April 4 – May 10, 2021.

o The shutdown was required in order to reline a

section of the prestressed concrete cylinder pipe.

o Picture #1 shows the contractor installing the

steel liners within the pipe.

• The AMP line is typically responsible for supplying

60% of the SMWD water supply.

o The District worked with regional partners to

wheel water throughout the region to ensure that

all agencies maintained water deliveries.

• The shutdown finished early, and the pipeline was returned to service on 5/4/2021.

Cypress Point RW Main Break

• On Saturday, 4/24 crews received a call around 8 pm indicating a large geyser of water erupting near

the Cypress Point community located south of Lake Mission Viejo.

o Crews discovered that the 16” recycled line was causing the geyser. The recycled system was

shut down and crews begin to clean the dirt and debris from the streets.

▪ Pictures #2 and #3 show the debris caused by the leak as well as the damage caused.

o The repair was made on Monday and Tuesday and the line was back in service on

Wednesday. Picture #4 shows the concrete pad being prepared after the repair.

o All regulatory agencies were informed of the Non-Domestic break.

o Preliminary analysis shows that the pipe failed due to internal corrosion.

North Beach LS – Install Motor Control Center

• The Electrical Division completed work on upgrading the motor control center at North Beach Lift

Station.

• Picture #5 shows the before while Picture #6 shows the after of the cabinet work.

4.2.a

Packet Pg. 40

Att

ach

men

t: A

pri

l202

1Op

sUp

dat

e (

Ap

ril2

1Op

sUp

dat

e)

Page 41: AGENDA SANTA MARGARITA WATER DISTRICT …

Chiquita WRP – Replaced pumps in

primary building

• The Mechanical Division

completed the installation of new

Sepex progressive pumps in the

primary building.

• The existing diaphragm pumps

were at the end of useful life and

parts were no longer available.

• Picture #7 shows the before

while Picture #8 shows the after.

AB 1826 Compliance

• AB 1826 requires business to recycle their organic waste.

• Staff worked with its landscaping company to achieve AB 1826 compliance ahead of schedule.

Emergency Communication Improvements

• The Safety Division completed the registration of several key staff in enrollment into the

Government Emergency Telecommunicaiton Service (GETS) system.

o By enrolling into the GETS service, District staff is eligible to participate in the Wireless

Priority Service which allows prioritized cellular usage during times of congested network

traffic such as a natural or manmade disasters.

o The system utilizes a calling-card which allows District staff to be prioritized on cellular

networks during emergency periods.

o This is one of several elements the District has in place to ensure communication in an

emergency.

Operations and Maintenance Activities

Collections Division

• Cleaned 148,610 feet of sewer pipeline.

o Picture #9 shows crews cleaning Marguerite Parkway with the

appropriate traffic delineation.

• CCTV inspected 25,670 feet of sewer pipeline.

• Performed 65,925 feet of preventative maintenance work orders.

• Maintained 10 lift station wet wells

4.2.a

Packet Pg. 41

Att

ach

men

t: A

pri

l202

1Op

sUp

dat

e (

Ap

ril2

1Op

sUp

dat

e)

Page 42: AGENDA SANTA MARGARITA WATER DISTRICT …

Valve & Hydrant Division

• Reduced valve turning activities during AMP shutdown and focused on hydrant maintenance.

o Painted 328 fire hydrants

o Pictures #10 and #11 show the before/after of a hydrant which was discovered to be

completely overgrown. Staff worked with the property owner to ensure that the hydrant will

remain uncovered moving forward.

Safety Division

• Coordinated replacement of access gate at Cordova Lift

Station seen in Picture #12.

o The existing gate was due for replacement and the

Safety Division identified an opportunity to

replace the gate with an ergonomic improvement

which reduces the risk of back injury.

o The existing gate was a single panel which

required great effort to move. The new gate is a

dual-panel design which makes it easier for staff

to open/close.

• Enrolled several key District staff in NIMS/SEMS

training.

o This training is vital in training staff how to utilize the Incident Command System protocol.

o Completion of this training allows the District to remain eligible for disaster relief funds.

• Provided training on:

o CPR/First Aid/AED

o Water Industry Distribution Operation Safety

o HAZ-WOPER (WWTP Operators)

o Advanced Construction Safety

o New Hire Safety Orientation

o ARC Flash Safety

4.2.a

Packet Pg. 42

Att

ach

men

t: A

pri

l202

1Op

sUp

dat

e (

Ap

ril2

1Op

sUp

dat

e)

Page 43: AGENDA SANTA MARGARITA WATER DISTRICT …

COMMITTEE NOTES

SANTA MARGARITA WATER DISTRICT

ENGINEERING AND OPERATIONS

ADJOURNED COMMITTEE MEETING

APRIL 16, 2021

TELECONFERENCE

Conference Phone Number: +1 530-414-9890

Audio Conferencing Code: 880 181 405#

CALL TO ORDER: 8:00 A.M.

COMMITTEE CHAIR: Frank Ury

COMMITTEE MEMBER: Justin McCusker

Call to Order @ 8:00 AM

1. PUBLIC FORUM

There were no requests to speak.

ATTENDEES

Members Present: Frank Ury (Chair) and Justin McCusker (Member)

Staff Present: Dan Ferons, Don Bunts, Tricia Butler, Nate Adams

Danny Peterson, Brian Harrison, Dustin Navarro,

Jim Leach, Cindy Lane

2. CONSENT CALENDAR

2.1 Consideration and Action on Water, Sewer, and Non-Domestic Facilities for Tract

17961 Located in Reata Glen in I.D. No. 4E; the Release of Water, Sewer, and Non-

Domestic Bonds; and Adoption of Resolution No. 2021-05-XX.

ACTION: APPROVED

Status: There was no discussion of the item.

2.2 Consideration and Action on Water and Sewer Facilities for Tract 17595 Located in

Alma Community (AQ15) in I.D. No. 4C; the Adoption of Resolution No. 2021-05-

XX.

ACTION: APPROVED

Status: There was no discussion of the item.

2.3 Consideration and Action on Water and Sewer Facilities for Tract 17597 Located in

Vida Community (AQ14) in I.D. No. 4C; the Adoption of Resolution No. 2021-05-

XX.

ACTION: APPROVED

Status: There was no discussion of the item.

4.3

Packet Pg. 43

Min

ute

s A

ccep

tan

ce:

Min

ute

s o

f A

pr

16, 2

021

8:00

AM

(In

form

atio

n It

ems)

Page 44: AGENDA SANTA MARGARITA WATER DISTRICT …

2 | P a g e

2.4 Consideration and Action on Award of Contract to Ayala Engineering for Lining at

Ladera Lift Station

ACTION: APPROVED

Status: There was no discussion of the item.

2.5 Consideration and Action on a Grant of Easement to San Diego Gas and Electric for

the Coto de Caza Lift Station Emergency Storage Basin project, C-1322C

ACTION: APPROVED

Status: There was no discussion of the item.

3. ACTION ITEMS RECOMMENDED BY COMMITTEE

3.1 Consideration and Action on USAA Casualty Insurance Claim

ACTION: APPROVED

Status: Mr. Danny Peterson, Logistics and Regulatory Manager stated the

claim was being brought to the Board due to damages that were in excess

of $10,000. Mr. Peterson stated that staff will formally reject the claim as

the person involved in the accident was not an SMWD employee and the

types of vehicles involved are not in the District's fleet. The committee

recommended the item for the Consent Calendar at the April 23rd Board

meeting.

4. CLOSED SESSION - DISCUSSION ON POSSIBLE THREATS TO SECURITY OF

ESSENTIAL PUBLIC SERVICES

ACTION: INFORMATION ONLY

Status: Chair Ury recessed the Engineering and Operations Committee

(EOC) meeting at 8:22 a.m. and the following committee members went

into Closed Session: Director Frank Ury, Director Justin McCusker, Dan

Ferons, Don Bunts, Tricia Butler, Danny Peterson, Dustin Navarro and

Brian Harrison. The EOC meeting resumed at 9:00 a.m. and was then

adjourned at 9:01 a.m.

5. INFORMATION ITEMS

5.1 Update on 2020 Urban Water Management Plan Preparation

ACTION: INFORMATION ONLY

Status: Mr. Nate Adams, Water Reliability Planning Manager provided

the update on the Urban Water Management Plan Preparation. The update

covered what is new for 2020: a Water Shortage Contingency Plan

(WSCP); Changes to Water Shortage Stages; and Next Steps.

4.3

Packet Pg. 44

Min

ute

s A

ccep

tan

ce:

Min

ute

s o

f A

pr

16, 2

021

8:00

AM

(In

form

atio

n It

ems)

Page 45: AGENDA SANTA MARGARITA WATER DISTRICT …

3 | P a g e

5.2 Clean Fleet Rule Update

ACTION: INFORMATION ONLY

Status: Mr. Danny Peterson discussed the item and highlighted the

California Air Resources Board's (CARB) new rule requiring all public

fleets and the majority of private fleets operating in California to report on

their medium and heavy-duty fleets. Mr. Peterson noted that the District

has been monitoring regulation developments that currently only impact

manufacturers but could impact the District in the future.

5.3 Engineering Department Update for Period Ending March 31, 2021

ACTION: INFORMATION ONLY

Status: Ms. Butler highlighted two items: 1) Through a Teams call with

Norway she was able to discuss the needs at the Chiquita Water

Reclamation Plant; and 2) that the production of recycled water at the

Lake Mission Viejo advanced Water Treatment Facility had reached over

300 acre feet.

5.4 Operations Update for Period Ending March 31, 2021

ACTION: INFORMATION ONLY

Status: There was no discussion of the item.

5.5 Engineering and Operations - Committee Meeting - Mar 12, 2021 8:00 AM

ACTION: INFORMATION ONLY

Status: There was no discussion of the item.

4.3

Packet Pg. 45

Min

ute

s A

ccep

tan

ce:

Min

ute

s o

f A

pr

16, 2

021

8:00

AM

(In

form

atio

n It

ems)