Agenda of 133 rd meeting of State Environment Impact Assessment Authority (SEIAA), Odisha, held on 16.07.2015 at 3.30 PM 1. Proceedings of SEAC, Odisha held on 23 rd June, 2015. Sl No. Name of the proponent Name of the Proposal SEAC recommendation Decision of SEIAA, Odisha 1 M/s Sesa Sterlite Ltd. EC for laterite mining project (ML area 47.757 ha.) of M/s Sesa Sterlite Ltd. with proposed production capacity of 3.0 lakh TPA at village Dangadeula, Tahasil Koraput, Dist-Koraput. The SEAC prescribed the additional ToR in addition to the standard ToRs prescribed by the MoEF & CC, Govt. of India for mining projects. 2 M/s Sesa Sterlite Ltd. EC for laterite mining project (ML area 49.250 ha.) of M/s Sesa Sterlite Ltd. with proposed production capacity of 3.0 lakh TPA at village Dangadeula, Tahasil Koraput, Dist-Koraput. The SEAC prescribed the additional ToR in addition to the standard ToRs prescribed by the MoEF & CC, Govt. of India for mining projects. 3 M/s Sesa Sterlite Ltd. EC for laterite mining project (ML area 48.40 ha.) of M/s Sesa Sterlite Ltd. with proposed production capacity of 3.0 lakh TPA at village Dangadeula, Tahasil Koraput, Dist-Koraput. The SEAC prescribed the additional ToR in addition to the standard ToRs prescribed by the MoEF & CC, Govt. of India for mining projects. 4 M/s Menkamunda Graphite Mines EC of M/s Menkamunda Graphite Mine for enhancement in production of Graphite from 1047 TPA to 15162 TPA over an area of 26.228 ha. at Menkamunda in district Bargarh by Sri Prabhas Chandra Agrawal. The SEAC decided to take decision on the proposal after receipt of information from the proponent. 5 M/s New Laxmi Steel & Power Pvt. Ltd. EC for Kurlubhata Decorative stone mines of M/s New Laxmi Steel & Power Pvt. Ltd. for enhancement of production from 843 M 3 /Annum of decorative stone over an area of 10.615j ha. at village Kurlubhata, Dist-Bolangir. The SEAC decided to take decision on the proposal after receipt of information from the proponent.

Agenda of 133rd meeting of State Environment Impact ... fileAgenda of 133rd meeting of State Environment Impact Assessment Authority (SEIAA), Odisha, held on 16.07.2015 at 3.30 PM

  • Upload
    buinhu

  • View
    213

  • Download
    0

Embed Size (px)

Citation preview

��

Agenda of 133rd meeting of State Environment Impact Assessment Authority (SEIAA), Odisha, held on 16.07.2015 at 3.30 PM

1. Proceedings of SEAC, Odisha held on 23rd June, 2015.

Sl No.

Name of the proponent

Name of the Proposal SEAC recommendation Decision of SEIAA, Odisha

1 M/s Sesa Sterlite Ltd.

EC for laterite mining project (ML area 47.757 ha.) of M/s Sesa Sterlite Ltd. with proposed production capacity of 3.0 lakh TPA at village Dangadeula, Tahasil Koraput, Dist-Koraput.

The SEAC prescribed the additional ToR in addition to the standard ToRs prescribed by the MoEF & CC, Govt. of India for mining projects.

2 M/s Sesa Sterlite Ltd.

EC for laterite mining project (ML area 49.250 ha.) of M/s Sesa Sterlite Ltd. with proposed production capacity of 3.0 lakh TPA at village Dangadeula, Tahasil Koraput, Dist-Koraput.

The SEAC prescribed the additional ToR in addition to the standard ToRs prescribed by the MoEF & CC, Govt. of India for mining projects.

3 M/s Sesa Sterlite Ltd.

EC for laterite mining project (ML area 48.40 ha.) of M/s Sesa Sterlite Ltd. with proposed production capacity of 3.0 lakh TPA at village Dangadeula, Tahasil Koraput, Dist-Koraput.

The SEAC prescribed the additional ToR in addition to the standard ToRs prescribed by the MoEF & CC, Govt. of India for mining projects.

4 M/s Menkamunda Graphite Mines

EC of M/s Menkamunda Graphite Mine for enhancement in production of Graphite from 1047 TPA to 15162 TPA over an area of 26.228 ha. at Menkamunda in district Bargarh by Sri Prabhas Chandra Agrawal.

The SEAC decided to take decision on the proposal after receipt of information from the proponent.

5 M/s New Laxmi Steel & Power Pvt. Ltd.

EC for Kurlubhata Decorative stone mines of M/s New Laxmi Steel & Power Pvt. Ltd. for enhancement of production from 843 M3/Annum of decorative stone over an area of 10.615j ha. at village Kurlubhata, Dist-Bolangir.

The SEAC decided to take decision on the proposal after receipt of information from the proponent.

��

6 M/s Paktia Quartz and Quartzite Mines

EC for M/s Paktia Quartz and Quartzite Mines over an area of 3.581 ha. for production quantity of 20315 MT per Annum of Sri L.K. Dash located at Mayurbhanj, Odihsa.

The SEAC decided to take decision on the proposal after receipt of information from the proponent.

7 M/s Chauthia Quartzs and Quartzite Mines

EC for M/s Chauthia Quartzs and Quartzite Mines over an area of 3.07 ha. for production of Quartz & quartzite 24000 MT per Annum at village Chauthia, Tahasil Champua in the district of Keonjhar of Sri Raju V.J.

The SEAC decided to take decision on the proposal after receipt of information from the proponent.

8 M/s Rebana Pyrophyllite

EC for M/s Rebana Pyrophyllite deposit in Rebana RF of Shri Kanan Bihari Pahi for production of 9000 TPA of Pyrophyllite ore and 7100 TPA of Quartzite ore over an Mine Lease area of 3.5936 ha. near Rampakot village , Ghatgaon Tahasil, Dist Keonjhar.

The SEAC decided to take decision on the proposal after receipt of information from the proponent.

Old Proposals 1 M/s City Trade

Acrade Pvt. Ltd. EC for proposed (S+12) storied group housing project of M/s City Trade Acrade Pvt. Ltd. at Patapur, Barang block in the district of Cuttack with total built up area 41021.74 M2.

The SEAC decided to take decision on the proposal after visit to the proposed site to verify the drainage network.

2 M/s ILIYAS Granites EC for Dhunkapara Decorative stone mines of M/s Iliyas Granites over mining lease area of 14.933 ha.

The SEAC recommended for grant of EC for a period of 30 years in favour of the project.

3 M/s Dominion Developers Pvt. Ltd.

EC for proposed construction of Multi stories residential apartment and housing project at mouza Patasahanipur, Seula, Tahasil Pipil, Dist Puri with total built up area 26926.06 M2. By M/s Dominion Developers Pvt. Ltd.

The SEAC recommended for grant of EC for a period of 7 years in favour of the project with stipulated conditions.

4 M/s Falcon Real Estate (P) Ltd.

EC for proposed multistoried residential complex (G+12 storied) at Sampur

The Committee decided to give a final chance to come for presentation in the

��

Tahasil, Bhubaneswar, Khurda with total built up area 427097 Sq.ft by M/s Falcon Real Estate (P) Ltd.

next SEAC meeting. If they will not attend the meeting, then the proposal to be returned to the SEIAA.

5 M/s Jayashakti Developers Pvt. Ltd.

EC for construction of buildings for the residential complex at Uttareswar mouza in Berhampur town in the district of Ganjam of M/s Jayashakti Developers Pvt. Ltd. with built up area 45305.76 M2.

The Committee decided to give a final chance to come for presentation in the next SEAC meeting. If they will not attend the meeting, then the proposal to be returned to the SEIAA.

6 M/s Mahughar decorative stone mines

EC of M/s Mahughar decorative stone mines for enhancement production of decorative stone from 3645 M3 to 72000 M3 per Annum over an area 13.901 ha. at village Mahughar Tahasil Berhampur in the district of Ganjam of Sri Samar Das.

SEAC decided to return the proposal to SEIAA, with a request to ask the proponent to resubmit the proposal with all the valid documents as per Om of MoEF&CC, Govt. of India dated 24.12.2013 for consideration of their project as B2 category.

7 M/s Bijaya Aditya Mines

Ec FOR Minmina and Satara Dolomite mines of M/s Bijaya Aditya Mines for production of 300300 TPA Dolomite over an area of 33.492 ha. at village Minmina and Satara, Po-Hatibari, Dist-Sundargarh.

The SEAC decided to call the proponent for a detail presentation in the next SEAC meeting.

2. Proceedings of SEAC, Odisha held on 02.07.2015.

Sl. No.

Name & Address of the proponent

Name of the project Mining lease period

Details of other mines including lease area located within 500 m of the mine lease area

Observation of SEAC Whether general condition apply

Maximum production capacity

Recommendation of SEAC

Decision of SEIAA, Odisha

1 Sri Nardeep Singh Khanduja At/Po-Khariar Road, Ward No-19, Ps-Jonk Tahasil-

Environmental Clearance for Salihakala Stone Quarry no.4 over an area 2.15 acre at village Salihakala,

(Lease Period-FY-2015-16 to 2019-20)

Nil 1. Furnished filled in Form-I, pre-feasibility report and check list forwarded by Tahasildar, Nuapada. 2. Topo sheet indicating location of the mine has been furnished.

No 2304 Cum Recommended for EC from 2015-16 to 2019-20

��

Nuapada, Dist-Nuapada, Odisha

Tahasil Nuapada, Dist- Nuapada. (Lease Period-FY-2015-16 to 2019-20)

3. Mining plan approved by the Joint Director, Geology Zonal Survey,Balangir on 23.05.15 4.No forest land involved in lease area 5.There is no protected areas i.e. National Park, Sanctuary, Habitat for Migratory Birds, Tiger Reserve, Protected Monuments, Inter-State boundary and critically polluted area as identified by CPCB etc. located within 5 km radius of the mine lease area. 6. There is no court case / litigation pending.

2 Sri Nardeep Singh Khanduja At/Po-Khariar Road, Ward No-19, Ps-Jonk Tahasil-Nuapada,Dist-Nuapada,Odisha

Environmental Clearance for Salihakala Stone Quarry no.5 over an area 2.250 acre at village Salihakala, Tahasil Nuapada, Dist- Nuapada. (Lease Period-FY-2015-16 to 2019-20)

(Lease Period-FY-2015-16 to 2019-20)

Nil 1. Furnished filled in Form-I, pre-feasibility report and check list forwarded by Tahasildar, Nuapada. 2. Topo sheet indicating location of the mine has been furnished. 3. Mining plan approved by the Joint Director, Geology Zonal Survey,Balangir on 23.05.15 4.No forest land involved in lease area 5.There is no protected areas i.e. National Park, Sanctuary, Habitat for Migratory Birds, Tiger Reserve, Protected Monuments, Inter-State boundary and critically polluted area as identified by CPCB etc. located within 5 km radius of the mine lease area. 6. There is no court case / litigation pending.

No 2016 Cum Recommended for EC from 2015-16 to 2019-20

3

Sri Madan Mohan Dalai At/Po-Allipur, PS-Gopalpur, Dist-

Environmental Clearance for Narayanpur Stone Quarry over an area 12.00 acre at village

(Lease Period-FY-2015-16 to 2019-20)

Nil 1. Furnished filled in Form-I, pre-feasibility report and check list forwarded by Tahasildar, Konisi 2. Topo sheet indicating location of the mine has been furnished.

No 2160 Cum Recommended for EC from 2015-16 to 2019-20

��

Ganjam,Odisha Narayanpur, Tahasil Konisi Dist-Ganjam. (Lease Period-FY-2015-16 to 2019-20)

3.Mining plan approved by the Mining Officer Ganjam Circle,Berhampur on 01.06.15 4.No forest land involved in lease area 5.There is no protected areas i.e. National Park, Sanctuary, Habitat for Migratory Birds, Tiger Reserve, Protected Monuments, Inter-State boundary and critically polluted area as identified by CPCB etc. located within 5 km radius of the mine lease area. 6. There is no court case / litigation pending.

4

Sri Ratikanta Rout At-Patala, Ps-Balimi, Dist-Dhenkanal,Odisha

Environmental Clearance for Kukuta Road Metal Quarry over an area 7.33 acre at village Kukuta, Tahasil Hindol, Dist- Dhenkanal. (Lease Period-FY-2015-16 to 2019-20)

(Lease Period-FY-2015-16 to 2019-20)

Nil 1. Furnished filled in Form-I, pre-feasibility report and check list forwarded by Tahasildar, Hindol. 2. Topo sheet indicating location of the mine has been furnished. 3. Mining plan approved by the Joint Director, Geology Zonal Survey,Dhenkanal on 03.06.15 4.No forest land involved in lease area 5.There is no protected areas i.e. National Park, Sanctuary, Habitat for Migratory Birds, Tiger Reserve, Protected Monuments, Inter-State boundary and critically polluted area as identified by CPCB etc. located within 5 km radius of the mine lease area. 6. There is no court case / litigation pending.

No 51185 Cum Recommended for EC from 2015-16 to 2019-20

5 Sri Pabitra Mohan Sahoo At-Deranga Tahasil-Kaniha,Dist-Angul,Odisha

Environmental Clearance for Deranga Sand Quarry over an area 15.00 acre at village Deranga Tahasil

(Lease Period-FY-2015-16 to 2019-20)

Nil 1. Furnished filled in Form-I, pre-feasibility report and check list forwarded by Tahasildar, Kaniha. 2. Topo sheet indicating location of the mine has been furnished.

Yes 10,000 Cum Recommended for EC from 2015-16 to 2019-20

��

Kaniha, Dist- Angul. (Lease Period-FY-2015-16 to 2019-20)

3.Mining plan approved by the Mining Officer Talcher Circle,Talcher on 06.05.15 4.No forest land involved in lease area 5.There is no protected areas i.e. National Park, Sanctuary, Habitat for Migratory Birds, Tiger Reserve, Protected Monuments, Inter-State boundary and critically polluted area as identified by CPCB etc. located within 5 km radius of the mine lease area. 6. There is no court case / litigation pending.

6 Sri Pabitra Mohan Sahoo At-Deranga Tahasil-Kaniha,Dist-Angul,Odisha

Environmental Clearance for Gaham Stone Quarry over an area 1.00 acre at village Gaham, Tahasil Kaniha, Dist-Angul. (Lease Period-FY-2015-16 to 2019-20)

(Lease Period-FY-2015-16 to 2019-20)

Nil 1. Furnished filled in Form-I, pre-feasibility report and check list forwarded by Tahasildar, Kaniha. 2. Topo sheet indicating location of the mine has been furnished. 3. Mining plan approved by the Mining Officer Talcher Circle,Talcher on 06.05.15 4.No forest land involved in lease area 5.There is no protected areas i.e. National Park, Sanctuary, Habitat for Migratory Birds, Tiger Reserve, Protected Monuments, Inter-State boundary and critically polluted area as identified by CPCB etc. located within 5 km radius of the mine lease area. 6. There is no court case / litigation pending.

No 4060 Cum Recommended for EC from 2015-16 to 2019-20

7 Sri Pabitra Mohan Sahoo At-Deranga Tahasil-Kaniha,Dist-

Environmental Clearance for Khajuria Sand Quarry over an area 15.00 acre at village

(Lease Period-FY-2015-16 to 2019-20)

Nil 1. Furnished filled in Form-I, pre-feasibility report and check list forwarded by Tahasildar, Kaniha. 2. Topo sheet indicating location

Yes 22,000 Cum Recommended for EC from 2015-16 to 2019-20

��

Angul,Odisha Khajuria, Tahasil Kaniha, Dist- Angul. (Lease Period-FY-2015-16 to 2019-20)

of the mine has been furnished. 3. Mining plan approved by the Mining Officer Talcher Circle, Talcher on 06.05.15 4.No forest land involved in lease area 5.There is no protected areas i.e. National Park, Sanctuary, Habitat for Migratory Birds, Tiger Reserve, Protected Monuments, Inter-State boundary and critically polluted area as identified by CPCB etc. located within 5 km radius of the mine lease area. 6. There is no court case / litigation pending.

8 Sri Kailash Chandra Mohanty At/ Po- Podasul,Dist-Balasore,Odisha

Environmental Clearance for Pratappur Sand Quarry over an area 20.00 acre at village Pratappur, Tahasil Nilagiri, Dist-Balasore. (Lease Period-FY-2015-16 to 2019-20)

(Lease Period-FY-2015-16 to 2019-20)

Nil 1. Furnished filled in Form-I, pre-feasibility report and check list forwarded by Tahasildar, Nilagiri. 2. Topo sheet indicating location of the mine has been furnished. 3.Mining plan approved by the Joint Director Geology, Keonjhar on 04.06.15 4.No forest land involved in lease area 5.There is no protected areas i.e. National Park, Sanctuary, Habitat for Migratory Birds, Tiger Reserve, Protected Monuments, Inter-State boundary and critically polluted area as identified by CPCB etc. located within 5 km radius of the mine lease area. 6. There is no court case / litigation pending.

Yes 13980 Cum Recommended for EC from 2015-16 to 2019-20

9 Nilakantha Swain At-KP Mahal,Po-Mitrapur,Dist-Balasore,;Odish

Environmental Clearance for Baichhanaranpur-II Sand Quarry over an area 1.30 acre at

(Lease Period-FY-2015-16 to 2019-20)

Nil 1. Furnished filled in Form-I, pre-feasibility report and check list forwarded by Tahasildar, Nilagiri. 2. Topo sheet indicating location of the mine has been furnished.

No 5200 Cum Recommended for EC from 2015-16 to 2019-20

a village Baichhanaranpur, Tahasil Nilagir, Dist- Balasore. (Lease Period-FY-2015-16 to 2019-20)

3. Mining plan approved by the Joint Director Geology, Keonjhar on 03.06.15 4.No forest land involved in lease area 5.There is no protected areas i.e. National Park, Sanctuary, Habitat for Migratory Birds, Tiger Reserve, Protected Monuments, Inter-State boundary and critically polluted area as identified by CPCB etc. located within 5 km radius of the mine lease area. 6. There is no court case / litigation pending.

10 Sri Animesh Ghosh At/Po-Bainchanuagan.Ps-Nilagiri,Dist-Balasore,Odisha

Environmental Clearance for Baichhanaranpur-I Sand Quarry over an area 27.45 acre at village Baichhanaranpur, Tahasil Nilagiri, Dist- Balasore. (Lease Period-FY-2015-16 to 2019-20)

(Lease Period-FY-2015-16 to 2019-20)

Nil 1. Furnished filled in Form-I, pre-feasibility report and check list forwarded by Tahasildar, Nilagiri. 2. Topo sheet indicating location of the mine has been furnished. 3. Mining plan approved by the Joint Director Geology, Keonjhar on 03.06.15 4.No forest land involved in lease area 5.There is no protected areas i.e. National Park, Sanctuary, Habitat for Migratory Birds, Tiger Reserve, Protected Monuments, Inter-State boundary and critically polluted area as identified by CPCB etc. located within 5 km radius of the mine lease area. 6. There is no court case / litigation pending.

Yes 18000 Cum Recommended for EC from 2015-16 to 2019-20

11 Sri Animesh Ghosh At/Po-Bainchanuagan.Ps-Nilagiri,Dist-Balasore,Odisha

Environmental Clearance for Balipal Sand Quarry over an area 24.12 acre at village Balipal, Tahasil Nilagiri, Dist-

(Lease Period-FY-2015-16 to 2019-20)

Nil 1. Furnished filled in Form-I, pre-feasibility report and check list forwarded by Tahasildar, Nilagiri. 2. Topo sheet indicating location of the mine has been furnished. 3. Mining plan approved by the

Yes 18000 cum Recommended for EC from 2015-16 to 2019-20

Balasore. (Lease Period-FY-2015-16 to 2019-20)

Joint Director Geology, Keonjhar on 03.06.15 4.No forest land involved in lease area 5.There is no protected areas i.e. National Park, Sanctuary, Habitat for Migratory Birds, Tiger Reserve, Protected Monuments, Inter-State boundary and critically polluted area as identified by CPCB etc. located within 5 km radius of the mine lease area. 6. There is no court case / litigation pending.

12 Sri Sanjit Kumar Sahoo At-Sipimakundapur,Tahasil-Jagatsingpur,Dist- Jagatsingpur,Odisha

Environmental Clearance for Mundilo-Patenigaon-Devinadi Sand Quarry over an area 15.00 acre at village Mundilo Tahasil Jagatsingpur, Dist- Jagatsingpur. (Lease Period-FY-2015-16 to 2019-20)

(Lease Period-FY-2015-16 to 2019-20)

Nil 1. Furnished filled in Form-I, pre-feasibility report and check list forwarded by Tahasildar, Jagatsingpur. 2. Topo sheet indicating location of the mine has been furnished. 3.Mining plan approved by the Director of Geology, Odisha,Bhubaneswar on 28.05.15 4.No forest land involved in lease area 5.There is no protected areas i.e. National Park, Sanctuary, Habitat for Migratory Birds, Tiger Reserve, Protected Monuments, Inter-State boundary and critically polluted area as identified by CPCB etc. located within 5 km radius of the mine lease area. 6. There is no court case / litigation pending.

Yes 2000 Cum SEAC has decided to return the proposal to SEIAA as the checklist is not filled up properly

13 Saroj Kumar Dhalasamanta Plot No-B/1444,Sector-6, Markatnagar,

Environmental clearance for Kathajodi River Sand Quarry over an area 15.00 acers at village

(Lease Period-FY-2015-16 to 2019-20)

Nil 1. Furnished filled in Form-I, pre-feasibility report and check list forwarded by Tahasildar, Baranga, 2. Topo sheet indicating location

Yes 56,000 Cum Recommended for EC from 2015-16 to 2019-20

���

Cuttack, Dist-Cuttack,Odisha

Bidhyadharpur ,Tahasil Baranga, District- Cuttack (LeasePeriod 2015-16 to 2019-20)

of the mine has been furnished. 3. Mining plan approved by the Deputy Director Geology Directorate of Geology, Bhubaneswar on 11.06.15 4.No forest land involved in lease area 5.There is no protected areas i.e. National Park, Sanctuary, Habitat for Migratory Birds, Tiger Reserve, Protected Monuments, Inter-State boundary and critically polluted area as identified by CPCB etc. located within 5 km radius of the mine lease area. 6. There is no court case / litigation pending.

14 Sri Jitendra Pradhan At-Hatbanpur,Ps-Kendrapara,Dist-Kendrapara,Odisha

Environmental Clearance for,Erada Devi River Sand Quarry over an area 15.00 acre at village Erada, Tahasil Naugaon, Dist- Jagatsinghpur. (Lease Period-FY-2015-16 to 2019-20)

(Lease Period-FY-2015-16 to 2019-20)

Nil 1. Furnished filled in Form-I, pre-feasibility report and check list forwarded by Tahasildar, Naugaon. 2. Topo sheet indicating location of the mine has been furnished. 3. Mining plan approved by the Director of Geology, Odisha,Bhubaneswar on 30.05.15 4.No forest land involved in lease area 5.There is no protected areas i.e. National Park, Sanctuary, Habitat for Migratory Birds, Tiger Reserve, Protected Monuments, Inter-State boundary and critically polluted area as identified by CPCB etc. located within 5 km radius of the mine lease area. 6. There is no court case / litigation pending.

Yes 15000 Cum Recommended for EC from 2015-16 to 2019-20

15 Sri Sarat Kumar Environmental (Lease Nil 1. Furnished filled in Form-I, pre- Yes 6250 Cum Recommen

���

Sahoo Village-Khannagar,Ps-Badambadi,Dist-Cuttack,Odisha

Clearance for,Kathajodi River Sand Quarry over an area 13.00 acre at village Khan Nagar, Tahasil Sadar Cuttack, Dist-Cuttack. (Lease Period-FY-2015-16 to 2019-20)

Period-FY-2015-16 to 2019-20)

feasibility report and check list forwarded by Tahasildar, Sadar Cuttack. 2. Topo sheet indicating location of the mine has been furnished. 3. Mining plan approved by the Deputy Director Geology,Directorate of Geology,Bhubaneswar on 17.06.15 4.No forest land involved in lease area 5.There is no protected areas i.e. National Park, Sanctuary, Habitat for Migratory Birds, Tiger Reserve, Protected Monuments, Inter-State boundary and critically polluted area as identified by CPCB etc. located within 5 km radius of the mine lease area. 6. There is no court case / litigation pending.

ded for EC from 2015-16 to 2019-20

16 Sri Bisheswar Lakra Village-Tarkera,Dist-Sundargarh,Odisha

Environmental Clearance for Tarkera River Sand Quarry over an area 12.60 acre at village Tarkera, Tahasil Kutra, Dist- Sundargarh. (Lease Period-FY-2014-15 to 2018-19)

(Lease Period-FY-2014-15 to 2018-19)

Nil 1. Furnished filled in Form-I, pre-feasibility report and check list forwarded by Tahasildar, Kutra. 2. Topo sheet indicating location of the mine has been furnished. 3.Mining plan approved by the Deputy Director Geology Zonal Survey, Sambalpur on 30.05.15 4.No forest land involved in lease area 5.There is no protected areas i.e. National Park, Sanctuary, Habitat for Migratory Birds, Tiger Reserve, Protected Monuments, Inter-State boundary and critically polluted area as identified by CPCB etc. located within 5 km radius of the mine lease area. 6. There is no court case /

Yes 11550 Cum Recommended for EC from 2015-16 to 2019-20

���

litigation pending. 17 Sri Judhistira

Sethi At/Po-Jaipur,Ps-Tirtol Dist-Jagatsinghpur

Environmental Clearance for Jaipur Mahanadi River Sand Quarry over an area 12.60 acre at village Jaipur, Tahasil Raghunathpur, Dist- Jagatsinghpur. (Lease Period-FY-2015-16 to 2019-20)

(Lease Period-FY-2015-16 to 2019-20)

Nil 1. Furnished filled in Form-I, pre-feasibility report and check list forwarded by Tahasildar, Raghunathpur. 2. Topo sheet indicating location of the mine has been furnished. 3.Mining plan approved by the Director of Geology, Odisha Bhubaneswar on 29.05.15 4.No forest land involved in lease area 5.There is no protected areas i.e. National Park, Sanctuary, Habitat for Migratory Birds, Tiger Reserve, Protected Monuments, Inter-State boundary and critically polluted area as identified by CPCB etc. located within 5 km radius of the mine lease area. 6. There is no court case / litigation pending.

Yes 18855 Cum Recommended for EC from 2015-16 to 2019-20

18 Sri Benugopal Panigrahi At-ainthapali,Po-Budharaja,Dist-Sambalpur,Odisha

Environmental Clearance for Harihara River Sand Quarry over an area 35.80 acre at village Badmal, Tahasil Rairakhol, Dist- Sambalpur.(Lease Period-FY-2015-16 to 2019-20)

(Lease Period-FY-2015-16 to 2019-20)

Nil 1. Furnished filled in Form-I, pre-feasibility report and check list forwarded by Tahasildar, Rairakhol. 2. Topo sheet indicating location of the mine has been furnished. 3.Mining plan approved by the Deputy Director Mines,Sambalpur Circle,Sambalpur on 27.05.15 4.No forest land involved in lease area 5.There is no protected areas i.e. National Park, Sanctuary, Habitat for Migratory Birds, Tiger Reserve, Protected Monuments, Inter-State boundary and critically polluted area as identified by CPCB etc. located within 5 km radius of the mine

Yes 3920 Cum Recommended for EC from 2015-16 to 2019-20

���

lease area. 6. There is no court case / litigation pending.

19 Sri Jayant Kumar Sikhar At-Ambika Sahi,Ward No.1,Baripada,Dist-Mayurbhanj,Odisha

Environmental Clearance for Balanga River Sand Quarry over an area 5.06 ha at village Tumuda, Tahasil Kuliana, Dist- Mayurbhanj. (Lease Period-FY-2015-16 to 2019-20)

(Lease Period-FY-2015-16 to 2019-20)

Nil 1. Furnished filled in Form-I, pre-feasibility report and check list forwarded by Tahasildar, Kuliana. 2. Topo sheet indicating location of the mine has been furnished. 3.Mining plan approved by the Joint Director, Geology,Keonjhar on 16.05.15 4.No forest land involved in lease area 5.There is no protected areas i.e. National Park, Sanctuary, Habitat for Migratory Birds, Tiger Reserve, Protected Monuments, Inter-State boundary and critically polluted area as identified by CPCB etc. located within 5 km radius of the mine lease area. 6. There is no court case / litigation pending.

Yes 52773 Cum Recommended for EC from 2015-16 to 2019-20

20 Sri Chhedial Kataruka Vill-Kamakhya Nagar,Dist-Dhenkanal,Odisha

Environmental Clearance for, Jamunakote River Sand Quarry over an area 12.50 acre at village Jamunakote Tahasil Bhuban, Dist- Dhenkanal. (Lease Period-FY-2015-16 to 2019-20)

(Lease Period-FY-2015-16 to 2019-20)

Nil 1. Furnished filled in Form-I, pre-feasibility report and check list forwarded by Tahasildar, Bhuban. 2. Topo sheet indicating location of the mine has been furnished. 3. Mining plan approved by the Joint Director Geology, Zonal Survey,Dhenkanal on 25.05.15 4.No forest land involved in lease area 5.There is no protected areas i.e. National Park, Sanctuary, Habitat for Migratory Birds, Tiger Reserve, Protected Monuments, Inter-State boundary and critically polluted area as identified by CPCB etc. located

Yes 3160 Cum SEAC has decided to return the proposal to SEIAA as the checklist is not filled up properly

���

within 5 km radius of the mine lease area. 6. There is no court case / litigation pending.

21 Sri Bijay Kumar Pal At-Kajipatna,Po-Uttampur,Ps-Sadar Cuttack,Dist-Cuttack,Odisha

Environmental Clearance for,Kuakhai River Sand Sairat,Naranpur over an area 15.00 acre at village Naranpur, Tahasil Barang, Dist- Cuttack. (Lease Period-FY-2015-16 to 2019-20)

(Lease Period-FY-2015-16 to 2019-20)

Nil 1. Furnished filled in Form-I, pre-feasibility report and check list forwarded by Tahasildar, Barang. 2. Topo sheet indicating location of the mine has been furnished. 3. Mining plan approved by the Deputy Director Geology,Directorate of Geology,Bhubaneswar on 11.06.15 4.No forest land involved in lease area 5.There is no protected areas i.e. National Park, Sanctuary, Habitat for Migratory Birds, Tiger Reserve, Protected Monuments, Inter-State boundary and critically polluted area as identified by CPCB etc. located within 5 km radius of the mine lease area. 6. There is no court case / litigation pending.

Yes 5,78,505 Cum

Recommended for EC from 2015-16 to 2019-20

22 M/s.RKD Construction Pvt.Ltd B/20,Chandaka Industrial Estate,Adarsh Vihar,Bhubaneswar

Environmental Clearance for Dalibandha Stone Quarry over an area 5.204 acre at village Dalibandha, Tahasil Daringbadi, Dist- Kandhamal. (Lease Period-FY-2015-16 to 2019-20)

(Lease Period-FY-2015-16 to 2019-20)

Nil 1. Furnished filled in Form-I, pre-feasibility report and check list forwarded by Tahasildar, Daringbadi. 2. Topo sheet indicating location of the mine has been furnished. 3. Mining plan approved by the Mining Officer Phulbani Circle,Phulbani on 29.05.15 4.No forest land involved in lease area 5.There is no protected areas i.e. National Park, Sanctuary, Habitat for Migratory Birds, Tiger Reserve, Protected Monuments,

No 50000 Cum Recommended for EC from 2015-16 to 2019-20

���

Inter-State boundary and critically polluted area as identified by CPCB etc. located within 5 km radius of the mine lease area. 6. There is no court case / litigation pending.

23 Sri Krupasindhu Prusty At/Po-Jasatikiri Dist-Bhadrak,Odisha

Environmental Clearance for Baitarani River Jasotikiri-I Sand Quarry over an area 26.90 acre at village Jasotikiri, Tahasil Bhandaripokhari, Dist- Bhadrak. (Lease Period-FY-2015-16 to 2019-20)

(Lease Period-FY-2015-16 to 2019-20)

Nil 1. Furnished filled in Form-I, pre-feasibility report and check list forwarded by Tahasildar, Bhandaripokhari. 2. Topo sheet indicating location of the mine has been furnished. 3. Mining plan approved by the Director of Geology Odisha,Bhubaneswar on 05.06.15 4.No forest land involved in lease area 5.There is no protected areas i.e. National Park, Sanctuary, Habitat for Migratory Birds, Tiger Reserve, Protected Monuments, Inter-State boundary and critically polluted area as identified by CPCB etc. located within 5 km radius of the mine lease area. 6. There is no court case / litigation pending.

Yes 10000 Cum Recommended for EC from 2015-16 to 2019-20

24 Sri Umakanta Boitei At/Po-Nerada,Dist-Bhadrak,Odisha

Environmental Clearance for Baitarani River Nreada-II Sand Quarry over an area 50.06 acre at village Nreada, Tahasil Bhandaripokhari, Dist- Bhadrak. (Lease Period-FY-2015-16 to 2019-20)

(Lease Period-FY-2015-16 to 2019-20)

Nil 1. Furnished filled in Form-I, pre-feasibility report and check list forwarded by Tahasildar, Bhandaripokhari. 2. Topo sheet indicating location of the mine has been furnished. 3. Mining plan approved by the Director of Geology Odisha,Bhubaneswar on 06.06.15 4.No forest land involved in lease area 5.There is no protected areas

Yes 25917 Cum Recommended for EC from 2015-16 to 2019-20

���

i.e. National Park, Sanctuary, Habitat for Migratory Birds, Tiger Reserve, Protected Monuments, Inter-State boundary and critically polluted area as identified by CPCB etc. located within 5 km radius of the mine lease area. 6. There is no court case / litigation pending.

25 Sri Santosh Kumar Sahoo At/Po-Nerada,Dist-Bhadrak,Odisha

Environmental Clearance for Baitarani River Akhuapada-I Sand Quarry over an area 16.00 acre at village Akhuapada, Tahasil Bhandaripokhari, Dist- Bhadrak. (Lease Period-FY-2015-16 to 2019-20)

(Lease Period-FY-2015-16 to 2019-20)

Nil 1. Furnished filled in Form-I, pre-feasibility report and check list forwarded by Tahasildar, Bhandaripokhari. 2. Topo sheet indicating location of the mine has been furnished. 3. Mining plan approved by the Director of Geology Odisha,Bhubaneswar on 04.06.15 4.No forest land involved in lease area 5.There is no protected areas i.e. National Park, Sanctuary, Habitat for Migratory Birds, Tiger Reserve, Protected Monuments, Inter-State boundary and critically polluted area as identified by CPCB etc. located within 5 km radius of the mine lease area. 6. There is no court case / litigation pending.

Yes 3030 Cum Recommended for EC from 2015-16 to 2019-20

26 Banabihari Routray At-Jasotikiri,Po-Nerada,Dist-Bhadrak, Odisha

Environmental Clearance for Baitarani River Nerada-I Sand Quarry over an area 31.56 acre at village Nerada, Tahasil Bhandaripokhari, Dist- Bhadrak. (Lease Period-FY-2015-16 to

(Lease Period-FY-2015-16 to 2019-20)

Nil 1. Furnished filled in Form-I, pre-feasibility report and check list forwarded by Tahasildar, Bhandaripokhari. 2. Topo sheet indicating location of the mine has been furnished. 3. Mining plan approved by the Director of Geology Odisha,Bhubaneswar on 01.06.15

Yes 4000 Cum Recommended for EC from 2015-16 to 2019-20

���

2019-20) 4.No forest land involved in lease area 5.There is no protected areas i.e. National Park, Sanctuary, Habitat for Migratory Birds, Tiger Reserve, Protected Monuments, Inter-State boundary and critically polluted area as identified by CPCB etc. located within 5 km radius of the mine lease area. 6. There is no court case / litigation pending.

27 Sri Banabihari Routray At-Jasotikiri,Po-Nerada,Dist-Bhadraka,Odisha

Environmental Clearance for Baitarani River Jasotikiri-II Sand Quarry over an area 26.90 acre at village Jasotikiri, Tahasil Bhandaripokhari, Dist- Bhadrak. (Lease Period-FY-2015-16 to 2019-20)

(Lease Period-FY-2015-16 to 2019-20)

Nil 1. Furnished filled in Form-I, pre-feasibility report and check list forwarded by Tahasildar, Bhandaripokhari. 2. Topo sheet indicating location of the mine has been furnished. 3. Mining plan approved by the Director of Geology Odisha,Bhubaneswar on 06.06.15 4.No forest land involved in lease area 5.There is no protected areas i.e. National Park, Sanctuary, Habitat for Migratory Birds, Tiger Reserve, Protected Monuments, Inter-State boundary and critically polluted area as identified by CPCB etc. located within 5 km radius of the mine lease area. 6. There is no court case / litigation pending.

Yes 2500 Cum Recommended for EC from 2015-16 to 2019-20

28 Sri Pradyuta Ranjan Das At-Gopabandhunagar, GP-Sunabeda, Ps-Damanjodi, Dist-

Environmental Clearance for Sapsil Road Metal Quarry over an area 0.77 acre at village Sapsil, Tahasil Koraput, Dist- Koraput. (Lease

(Lease Period-FY-2015-16 to 2019-20)

Nil 1. Furnished filled in Form-I, pre-feasibility report and check list forwarded by Tahasildar, Koraput. 2. Topo sheet indicating location of the mine has been furnished. 3. Mining plan approved by the

No 4900 Cum Recommended for EC from 2015-16 to 2019-20

��

Koraput, Odisha Period-FY-2015-16 to 2019-20)

Joint Director Geology Zonal Survey, Koraput on 05.05.15 4.No forest land involved in lease area 5.There is no protected areas i.e. National Park, Sanctuary, Habitat for Migratory Birds, Tiger Reserve, Protected Monuments, Inter-State boundary and critically polluted area as identified by CPCB etc. located within 5 km radius of the mine lease area. 6. There is no court case / litigation pending.

29 Sri Gurumeet Singh At-Colony,Uditnagar Mandal-Rourkela,Dist-Sundargarh,Odisha

Environmental Clearance for Sapsil Road Metal Quarry over an area 0.55 acre at village Sapsil, Tahasil Koraput, Dist- Koraput. (Lease Period-FY-2015-16 to 2019-20)

(Lease Period-FY-2015-16 to 2019-20)

Nil 1. Furnished filled in Form-I, pre-feasibility report and check list forwarded by Tahasildar, Koraput. 2. Topo sheet indicating location of the mine has been furnished. 3. Mining plan approved by the Joint Director Geology Zonal Survey,Koraput on 05.05.15 4.No forest land involved in lease area 5.There is no protected areas i.e. National Park, Sanctuary, Habitat for Migratory Birds, Tiger Reserve, Protected Monuments, Inter-State boundary and critically polluted area as identified by CPCB etc. located within 5 km radius of the mine lease area. 6. There is no court case / litigation pending.

No 4161 Cum Recommended for EC from 2015-16 to 2019-20

30 Sri Robert Topno At-Bartagutu,Po-Biramitrapur,Rourkela,Dist-Sundargarh,Odi

Environmental Clearance for Kuarmunda Sand Source-I and Sand Source-II over an area 12.00 acre and

(Lease Period-FY-2015-16 to 2019-20)

Nil 1. Furnished filled in Form-I, pre-feasibility report and check list forwarded by Tahasildar, Kuarmunda. 2. Topo sheet indicating location of the mine has been furnished.

Yes 3000 Cum and 1000 Cum

Recommended for EC from 2015-16 to 2019-20 subject to receipt

��

sha 8.00 acre at village Kuarmunda, Tahasil Kuarmunda, Dist- Sundargarh. (Lease Period-FY-2015-16 to 2019-20)

3. Mining plan approved by the Mining Officer,Rourkela on 26.05.15 4.No forest land involved in lease area 5.There is no protected areas i.e. National Park, Sanctuary, Habitat for Migratory Birds, Tiger Reserve, Protected Monuments, Inter-State boundary and critically polluted area as identified by CPCB etc. located within 5 km radius of the mine lease area. 6. There is no court case / litigation pending.

of scrutiny fee as SEIAA has forwarded both the proposal of the proponent in a single application

31 Sri Sikhar Chandra Jena At-Jharapada Ps-Laxmisagar Thasil-Bhubaneswar,Dist- Khurda

Environmental Clearance for Kushabhadra River Sand Quarry over an area 40.16 acre at village Kesura, Tahasil Bhubaneswar, Dist- Khurda. (Lease Period-FY-2015-16 to 2019-20)

(Lease Period-FY-2015-16 to 2019-20)

Nil 1. Furnished filled in Form-I, pre-feasibility report and check list forwarded by Tahasildar, Bhubaneswar. 2. Topo sheet indicating location of the mine has been furnished. 3. Mining plan approved by the Director of Geology Odisha, Bhubaneswar on 19.06.15 4.No forest land involved in lease area 5.There is no protected areas i.e. National Park, Sanctuary, Habitat for Migratory Birds, Tiger Reserve, Protected Monuments, Inter-State boundary and critically polluted area as identified by CPCB etc. located within 5 km radius of the mine lease area. 6. There is no court case / litigation pending.

Yes 4,25,160 Cum

Recommended for EC from 2015-16 to 2019-20

32 M/s Samar Das, Owner, C-2, 007, Kedar Gouri Apartment,

Environmental Clearance for Mahughara Decorative Stone Mine of Sri Samar

Lease period up to 11.07.2025 (20 years)

Nil 1. Furnished filled in Form-I, pre-feasibility report and check list. 2. Topo sheet indicating location of the mine has been furnished. 3. Mining plan approved by the

Yes Recommended for EC from 2015-16 to 2019-20 subject

���

Bhubaneswar (Odihsa)

Das over an area of 13.901 ha. in village Mahughara, under Tahasil Kukudakhandi, Berhampur, Dist-Ganjam of Odisha state for enhancement of production form 3,645 m3 to 7200 m3 per Annum of Decorative Stone.

Director of mines, Odisha, Bhubaneswar. 4.No forest land involved in lease area 5.There is no protected areas i.e. National Park, Sanctuary, Habitat for Migratory Birds, Tiger Reserve, Protected Monuments, Inter-State boundary and critically polluted area as identified by CPCB etc. located within 5 km radius of the mine lease area. 6. There is no court case / litigation pending.

to receipt of scrutiny fee as SEIAA has forwarded both the proposal of the proponent in a single application

33 Sri Bhramar Bar Das At/Po-Deogaon, Po-Rourkela Tahasil-Rourkela Dist-Sundargarh, Odisha

Environmental Clearance for Jharabahal Stone Quarry over an area 12.00 acre at village Jharabahal, Tahasil Rourkela, Dist- Sundargarh. (Lease Period-FY-2015-16-2016-17)

Lease period 2 years

Nil 1. Furnished filled in Form-I, pre-feasibility report and check list forwarded by Tahasildar, Rourkela 2. Topo sheet indicating location of the mine has been furnished. 3.Mining plan approved by the Mining Officer, Rourkela on 12.05.15 4.No forest land involved in lease area 5.There is no protected areas i.e. National Park, Sanctuary, Habitat for Migratory Birds, Tiger Reserve, Protected Monuments, Inter-State boundary and critically polluted area as identified by CPCB etc. located within 5 km radius of the mine lease area. 6. There is no court case / litigation pending.

No 10,070 m3

34 Sri Shiba Prasad Padhi, At-Ranibagicha, Po/PS-Sundargarh Town,

Environmental Clearance for Badabanga Stone Quarry over an area 9.34 acres at village Badabanga, Tahasil

(Lease Period-FY-2015-16 to 2017-18).

Nil 1. Furnished filled in Form-I, pre-feasibility report and check list forwarded by Tahasildar, Lephripara. 2. Topo sheet indicating location of the mine has been furnished.

No 41386 Cum

���

Sundagarh, Pin-770001

Lephripara in the district of Sundargarh. (Lease Period-FY-2015-16 to 2017-18)

3.Mining plan approved by the Deputy Director of Geology Zonal Survey, Sambalpur on 11.05.15 4.No forest land involved in lease area 5.There is no protected areas i.e. National Park, Sanctuary, Habitat for Migratory Birds, Tiger Reserve, Protected Monuments, Inter-State boundary and critically polluted area as identified by CPCB etc. located within 5 km radius of the mine lease area. 6. There is no court case / litigation pending.

3. Proposal of mining project of lease area above 25 ha, received by SEIAA, Odisha

4. New Minor Mineral Project Proposals (40 nos.) received by SEIAA with lease area less than 25 ha. (Annexure-I).

Any other item with the permission by Chairman.

Sl No.

Date of receipt

Project locality/area/approvals enclosed Present Status Decision of the SEIAA

1 13.07.15 Environmental Clearance for Gambhira Rudra Gopalpur Samil Naharpatna Sand Quarry over an area 38.442 ha. at village Gambhira Rudragopalpur-Samil Naharpatna Tahasil Remuna in the district of Balasore of Sri Satrughna Chand.

Document Received Form-1, Pre-feasibility report, Approved Mining Plan Scrutiny fees of Rs.100000/- (DD No. 043514 dtd. 23.06.2015)