Upload
others
View
2
Download
0
Embed Size (px)
Citation preview
Dutchess County Water and Wastewater Authority June 2020 Agenda
AGENDA
DATE OF MEETING: Wednesday, June 17, 2020 4:00pm PLACE OF MEETING: 1 Lagrange Avenue, Poughkeepsie, NY 12603
1. CALL TO ORDER
Roll call of Board Members and Other Participants
2. PUBLIC COMMENT 3. CONSENT ITEMS (001) Minutes of May 20, 2020 Regular Meeting (002) (2020.06.A) Approval of May 20, 2020 Regular Meeting Minutes 4. CHAIRMAN’S REPORT (003) Proposed COVID-19 Return to Work Policy (004) (2020.06.B) Approval of COVID-19 Return to Work Policy 5. OPERATION’S REPORT (005) Monthly System Report (006) Overview of Security Measures (007) Overview of Facility Backup Power Provisions
6. FINANCE REPORTS (008) Warrant (009) (2020.06.C) Approval of Warrant (010) 2019 Continuing Disclosure Statement (011) Division of Water Resources Preliminary 2020 Budget Request (012) Fund Balance Presentation Memo (013) CIA Water Rate Reduction Request
7. CAPITAL PROJECT REPORTS (014) EFC Funding Memo (015) DFS Clarifier Installation Memo (016) (2020.06.D) Award of DFS Clarifier Installation Contract (017) HP Phase 2 Meter Project Status Report (018) GFS WWTP Project Status Report (019) GFS Collection System Project Status Report (020) Tivoli Water Project Status (021) Tivoli Sewer Project Status (022) Pinebrook Water Interconnection Project Status
8. COMMUNITY PROJECTS 9. NEW FOR CONSIDERATION
10. EXECUTIVE SESSION (023) (2020.06.E) Open Executive Session (024) (2020.06.F) Close Executive Session
11. ADJOURNMENT - Next meeting date Wednesday, July 22, 2020 @ 4:00 pm,
at 1 Lagrange Ave., Poughkeepsie, NY 12603
DUTCHESS COUNTY WATER AND WASTEWATER AUTHORITY
UNAPPROVED MINUTES OF MAY 20, 2020
Board Members Attending in Person Staff Attending in Person None Bridget Barclay
Jonathan Churins Michael Keating
Rich Winchester
Staff Present via Video/Conference Call Christine Curtis Ed Mills Danielle Hardman
Cris Limato Board Members Present via Video/Conference Call Tom LeGrand Vince DiMaso Rudy Vavra Board Members Absent Larry Knapp Mike Cotton
Ex-Officio Member Present via Conference Call Eoin Wrafter – Commissioner, Dutchess County Planning
Others Present None. Meeting Open – Introductions The meeting opened at 4:10 pm.
Tom Legrand called the meeting and began with a roll call to identify those attending the meeting both in the office and by conference call. Public Comment No members of the public were present.
Approval of Meeting Minutes Bridget recommended that the Minutes be approved as amended and indicated that Mike Cotton was in the office for last month’s Board meeting. Rudy made a motion to approve the regular meeting minutes of April 22, 2020 as amended. The motion was seconded by Vince, a roll call vote was taken, and the resolution passed unanimously. (Res.2020.05.A) Chairman’s Report COVID-19 Response Report Tom mentioned that the Board will continue to attend meetings remotely. The floor was passed to Bridget and she reviewed DCWWA’s COVID-19 response status. Bridget reviewed that a comprehensive report was provided in the Board packet and includes the Authority’s plan as the County moves toward a gradual “re-opening”. She reviewed that DCWWA, as an “essential service”, has maintained full functionality since the outset of the COVID-19 pandemic. As businesses reopen and COVID-19 related restrictions are eased, the aspects anticipated to most impact DCWWA operations and functions will be the reversal of certain executive order, reversal of flexibility in compliance monitoring procedures, requirements and / or guidance instituted by the state as part of the Re-opening New York program, increased customer activity and response expectations and increased business and private construction activity. As the Authority moves through the re-opening staff is closely monitoring State and Federal guidelines to ensure that all policy and procedures remain up to date and adjustments are made as regulations and guidance change. At this time, DCWWA’s focus is one of moving from a phase of rapid deployment to normalization and formalization of our current mode of operations. Management will continue to update the Board and staff on any changes to the Authority policies and procedures and will ensure staff is properly trained on best safety practices. Operations Reports Monthly System Operations Reports No questions were presented on the Monthly System Operations Reports. Authorize Amendment to Cooper Rd Operations Contract Bridget reviewed that the Amendment to Cooper Rd Operations Contract presented extends DCWWA’s contract with Dutchess County for the operation of the Cooper Rd System from March 15, 2020 through May 15, 2020. She noted that at this time the Authority is no longer managing the system and that operation of the system is now the responsibility of the residents. Rudy made a motion to approve the Amendment to the Cooper Rd Operations Contract. This was seconded by Vince, a roll call vote was taken, and the resolution passed unanimously. (Res.2020.05.B).
NY WARN Memo – Authorize NY WARN Mutual Aid & Assistance Agreement Ed explained the NY WARN Program is a Statewide Water / Wastewater Agency Response Network (WARN) designed to provide utility to utility response during an emergency. Additionally, it provides its member utilities with emergency planning and response and recovery information before, during and after an emergency. Staff is recommending the Authority join and believes it to be a long-term, potentially beneficial resource. Rudy made a motion to approve the NY WARN Mutual Aid & Assistance Agreement as presented. This was seconded by Vince, a roll call vote was taken, and the resolution passed unanimously. (Res.2020.05.C). Approval of Amendment to Procurement Policy Rudy made a motion to approve the Amendment to the Procurement Policy as presented. This was seconded by Vince, a roll call vote was taken, and the resolution passed unanimously. (Res.2020.05.D). Finance Reports: Approval of Warrant No questions on the warrant were presented. Rudy made a motion to approve the warrant as presented. This was seconded by Vince, a roll call vote was taken, and the resolution passed unanimously. (Res.2020.05.E). Approval of Amendment to Employee Handbook Bridget reviewed the change for Employee Benefit time specifically for when an employee is required to work on a regularly scheduled holiday. Rudy made a motion to approve the Amendment to the Employee Handbook as presented. This was seconded by Vince, a roll call vote was taken, and the resolution passed unanimously. (Res.2020.05.F). Fund Balance Presentation Memo Tom tabled review of the Fund Balance Presentation Memo for the next meeting when Board Member Mike Cotton will be present. CIA Water Rate Reduction Request Tom tabled review of the CIA Water Rate Reduction Request for the next meeting when Board Member Mike Cotton will be present. Capital Project Reports: Hyde Park Phase 2 Meter Projects Status Report Ed referenced the memo that was provided in the Board packet. Currently, field operations have been shut down due the COVID-19 pandemic. The contractor has stated field operations will not resume until end of June, early July. Operations will
not reactivate until 2 weeks after NYC reopens. On behalf of SAKS Metering, Inc., Ed is requesting an extension of the Contract for the 2 months of time that operations have been interrupted due to the COVID-19 pandemic. Rudy made a motion to approve the Execution of Change Order No. 1 to Contract HPR-PWSC-2019 PHASE 2 for the Hyde Park Regional Phase 2 Water Meter Project as presented. This was seconded by Vince, a roll call vote was taken, and the resolution passed unanimously. (Res.2020.05.E). GFS WWTP Project Status Jonathan reviewed the project is in the submittal phase and the Authority is working its way through administrative and construction submittals. Project is on schedule and construction mobilization is expected to begin June 3rd, 2020. GFS I&I Rehabilitation Project Jonathan reported project design is complete and the Authority is awaiting EFC approval to move forward. Tivoli Water System Mike reported that the Tivoli Tank reconstruction project is moving forward, and the electrical and general contractors are currently processing submittals. The General Contractor has begun site preparation at the well field where the new tank will be installed. Construction access to the site has been completed. The Water main and well improvement projects are still under review with the Department of Community and Behavioral Health. Mike has been proactive in following up with the department in seeking approval. Tivoli Sewer System Mike reviewed that recently he and operations staff met with a contractor to begin the approved flow meter study. Flow meters have been installed at three key manholes and the data collected from those meters will be provided to the contracted engineer to evaluate for detailed design. Pinebrook Water Interconnection Project Status Jonathan reviewed MJ Engineering is working on design of the project. The initial site surveying and geotechnical work has been completed. Some additional geotechnical work will most likely be done to further define the profile of rock in the corridor of where lines will be run. Project is on track for bid documents to be submitted by the end of the year and construction to begin next summer. Community Projects Bridget reviewed that all community projects are on hold at this time. The community projects currently on hold are the Town Poughkeepsie Storage Tank Feasibility Study and the evaluation of the Village of Rhinebeck water system.
New for Consideration Nothing new presented. Executive Session: No executive session was presented. Motion to Adjourn: At 4:43 pm Tom made a motion to adjourn. This was seconded by Vince, voted on and passed unanimously. The next regular board meeting date is on Wednesday, June 17, 2020 at 4:00 pm, at 1 Lagrange Ave., Poughkeepsie, NY 12603. Respectfully submitted, Danielle Hardman, Senior Typist
Resolutions
1. (2020.05.A) Minutes of April 22, 2020 Regular Meeting 2. (2020.05.B) Authorize Amendment to Cooper Road Operations Contract 3. (2020.05.C) Authorize NY WARN Mutual Aid & Assistance Agreement 4. (2020.05.D) Approve of Amendment to Procurement Policy 5. (2020.05.E) Approval of Warrant 6. (2020.05.F) Approval of Amendment to Employee Handbook 7. (2020.05.G) Authorize CO No. 1 to Installation Contract – HP Phase 2
Meter Project 8. (2020.05.H) Open Executive Session – Not Used 9. (2020.05.I) Close Executive Session – Not Used
RESOLUTION NO. 2020.06.A Authority Board – DCWWA
June 17, 2020 Meeting
APPROVAL OF MINUTES
____________________ offers the following resolution and moves its adoption:
Approval of minutes of May 20, 2020 Regular Meeting
Seconded by ____________________
Record of Vote: Aye Nay
Thomas LeGrand ___ ___
Vincent DiMaso ___ ___
Larry Knapp ___ ___
Rudy Vavra ___ ___
Michael Cotton ___ ___
RESOLUTION NO. 2020.06.B Authority Board – DCWWA
June 17, 2020 Meeting
Approval of Return to Work Policy
__________________ offers the following resolution and moves its adoption:
WHEREAS; The Authority Board recognizes the importance of establishing measures to protect the
health and well-being of Authority employees in light of the ongoing COVID-19 pandemic, and
WHEREAS; staff has drafted a Return to Work Policy to establish protocols and guidance to be
followed for employees returning to work following a COVID-19 related absence; and
Whereas, the Board has reviewed the proposed Policy and considered the benefits to the Authority;
Now, Therefore Be It Resolved, that the Authority Board hereby approves the Return to Work
Policy to be effective as of this date.
Seconded by _________________________
Record of Vote: Aye Nay
Thomas LeGrand ___ ___
Vincent DiMaso ___ ___
Larry Knapp ___ ___
Rudy Vavra ___ ___
Michael Cotton ___ ___
TO:
FROM:
DATE:
ATTENDEES Via Phone: Winchester, R. Sabia, K. Doyle, R.
Cody, N Vanessa, K
Petit, A. Coon, Jr., L.
Arbors (Zone O)
JAN FEB MAR APR MAY JUN
19,800 22,200 20,100 21,000 20,700 22,200
JUL AUG SEP OCT NOV DEC
22,500 21,400 21,000 21,700 20,000 19,300
Systems Operation ReportFor the month of June 2020
Authority Board
Rich Winchester
Tue. June17, 2020
Status of Current Work Items:
Operations normal.
1. HPR staff recomends replacing master
meter.
2. Ross Valve service recommended.
Note: All testing aspects are in compliance.
Arbors
Average Daily Water Production 1
10,000
20,000
30,000
J a nua r y Apr i l J ul y Oc t obe r
2 0 1 8
2 0 1 9
2 0 2 0
Birch Hill (Zone K)
JAN FEB MAR APR MAY JUN
12,300 12,500 13,346 14,400 16,400 16,460
JUL AUG SEP OCT NOV DEC
15,686 12,590 15,096 15,388 14,417 13,700
CDWTL
JAN FEB MAR APR MAY JUN
1,393,710 1,341,897 1,292,355 1,633,667 1,766,710 1,446,200
JUL AUG SEP OCT NOV DEC
1,581,742 1,550,806 1,603,700 1,648,645 1,635,300 1,435,000
Status of Current Work Items:
1. Filter performance review needed. Price
from manufacturer has been provided.
2. Flow sensors replaced for both chlorine
pumps. Signal loss creating alarms.
Note: All testing aspects are in compliance.
Status of Current Work Items:
1. Sample hydrant D needs repair.
Completed
2. Heater in amonia and Cl2 rooms need
servicing or replacement. In progress.
3. Decomissioning bulk chemical storage
tanks in progress. Completed
Note: All testing aspects are in compliance.
Birch Hill
Average Daily Water Production 1
10,000
15,000
January April July October
2018
2019
2020
Central Dutchess Water
Average Daily Flow 1
850,000
1,050,000
1,250,000
1,450,000
1,650,000
2018
2019
2020
Chelsea Cove WW (S.D. #1)
JAN FEB MAR APR MAY JUN
90,000 89,000 96,000 100,000 98,000 93,000
JUL AUG SEP OCT NOV DEC
84,000 105,000 77,000 77,000 115,000 146,000
Dalton Farms Water (Zone H)
JAN FEB MAR APR MAY JUN
92,100 93,000 99,325 101,800 112,700 96,876
JUL AUG SEP OCT NOV DEC
101,167 95,738 93,760 88,780 107,743 96,800
Status of Current Work Items:
1. Blowers 1 is out of service. Seal fail.
Repair approved.
2.Primary clarifier #2 needs repair. Parts on-
site
Note: All testing aspects are in compliance.
Status of Current Work Items:
1. Brush hogging needed. Evaluating
estimates.
2. Well 5 online
Note: All testing aspects are in compliance.
Chelsea Cove Wastewater
Average Daily Flow 1
55,00065,00075,000
85,00095,000
January April July October
2018
2019
2020
Dalton Farms Water
Average Daily Water Production 1
70,00080,00090,000
100,000110,000120,000
January April July October
2018
2019
2020
Dalton Farms WW (S.D. #3)
JAN FEB MAR APR MAY JUN
187,000 193,000 110,000 118,000 102,000 117,000
JUL AUG SEP OCT NOV DEC
108,000 106,000 106,000 103,000 141,000 190,000
Fairways Water (Zone M)
JAN FEB MAR APR MAY JUN
3,700 3,700 3,700 5,200 7,700 6,200
JUL AUG SEP OCT NOV DEC
8,500 6,900 5,400 4,500 4,700 4,200
Status of Current Work Items:
1. Leak on flange for backwash pumps
2. Vent fan 3 is out of service.
3. EQ pumps 1&2 need new slide rails.
4. Sand filter cells need repair.
5.West Clarifier sludge collector is O.S.
Demo completed. Parts delivered 3/12
6. Dosing box repair needed. Requested
quote.
7. UV system rehab cont. Parts installed
Status of Current Work Items:
1. Piping in plant will need to be replaced.
2. Booster pump #2 off-line due to leak.
Completed
Valves are now operable. Replacement plan
being discussed.
Note: All testing aspects are in compliance.
Dalton Farms Wastewater
Average Daily Flow 1
75,00085,00095,000
105,000115,000125,000135,000
January April July October
2018
2019
2020
Fairways
Average Daily Water Production 1
2,500
4,000
5,500
7,000
8,500
January April July October
2018
2019
2020
Fairways WW (S.D. #6)
JAN FEB MAR APR MAY JUN
JUL AUG SEP OCT NOV DEC
Greenbush Water/Violet Ave. (Zone Q)
JAN FEB MAR APR MAY JUN
51,000 50,700 51,500 51,600 59,000 81,800
JUL AUG SEP OCT NOV DEC
93,200 78,300 51,400 48,300 51,900 48,600
Status of Current Work Items:
1. DBP results under review. Last results are
within limits.
2. Replaced Hydrant @377 Violet Ave.
Note: All testing aspects are in compliance.
Status of Current Work Items:
1. Pump #2 Pit #3 pump needs to be
replaced
2. Pump #1 in Pit #1 repaired -long run
times being investigated.
Note: Wastewater flow is not metered.
Greenbush Water
Average Daily Water Production 1
25,000
40,000
55,000
70,000
January April July October
2018
2019
2020
Greenfields Wastewater
Average Daily Flow 1
14,00044,00074,000
104,000134,000164,000194,000
January April July October
2018
2019
2020
JAN FEB MAR APR MAY JUN
101,742 134,034 85,516 97,200 77,871 48,900
JUL AUG SEP OCT NOV DEC
45,700 42,500 42,200 65,870 118,500 139,500
Greenfields Water (Zone S & T)
JAN FEB MAR APR MAY JUN
53,400 49,700 51,000 51,600 57,500 54,700
JUL AUG SEP OCT NOV DEC
53,700 50,500 52,100 51,700 54,800 52,900
Status of Current Work Items:
1. Well #12 on stand by. Flushed weekly
2. Planning to replace leaking piping @ old
PSI Tank inside WTP.
3. Emergency generator repair needed. Load
bank testing completed. Protective Power
recomends replacing this generator.
Note: All testing aspects are in compliance.
Status of Current Work Items:
1. Repair needed on frame for south RBC.
2. Dosing tank control panel - repair needed
3. Blower #2 is out of service. #1 is leaking
oil.
DCWWA staff wired blower 2 to contact for
blower 1. Blower 2 in service.
4. Filter rehab under evaluation. Filter 1 has
been cleaned and is ready for rehab.
5. Upgrade to STP in progress.
Note: All testing aspects are in compliance.
Greenfields Water
Average Daily Water Production 1
2 5,0 0 0
3 5,0 0 0
4 5,0 0 0
55,0 0 0
6 5,0 0 0
January A pril July Octo ber
2 0 18
2 0 19
2 0 2 0
Greenfields Wastewater
Average Daily Flow 1
14,00044,00074,000
104,000134,000164,000194,000
January April July October
2018
2019
2020
JAN FEB MAR APR MAY JUN
814,000 853,000 839,000 811,000 843,000 999,000
JUL AUG SEP OCT NOV DEC
1,090,000 919,000 987,000 947,000 845,000 786,000
Pinebrook Water (Zone R)
JAN FEB MAR APR MAY JUN
15,800 16,400 14,900 16,300 16,700 16,400
JUL AUG SEP OCT NOV DEC
16,100 17,900 16,500 14,900 16,300 17,600
Status of Current Work Items:
1. Softener is on stand by
2. Well #1 back online Wells 2&3 on stand
by.
3. Increased monitoring for Iron as requested
by DOH.
4. Interconnection design in progress.
.
(Zones A, B, C, D, L)
Status of Current Work Items:
1. Cl2 analyzer sent out for maintenance.
2. Staff broke into two teams with little
crossover due to Cronavirus. An additional
lab has been set up as well.
Note: All testing aspects are in compliance.
Hyde Park Regional
Hyde Park Regional
Avg. Daily Water Production
750,000850,000950,000
1,050,0001,150,0001,250,000
January April July October
2018
2019
2 0 2 0
Pinebrook Water
Average Daily Water Production 1
10,00015,000
20,00025,000
30,00035,000
January April July October
2018
2019
2020
Pinebrook WW (S.D. #7)
JAN FEB MAR APR MAY JUN
13,200 13,445 13,340 13,920 13,938 14,100
JUL AUG SEP OCT NOV DEC
13,000 14,900 13,300 13,600 13,900 15,300
Quaker Hill (Zone U)
JAN FEB MAR APR MAY JUN
15,500 15,300 15,400 32,400 72,400 22,300
JUL AUG SEP OCT NOV DEC
26,100 24,300 20,100 18,600 16,500 16,000
Status of Current Work Items:
1. New plant is online as of 3/11-19
Note: All testing aspects are in compliance.
Status of Current Work Items:
1.GWUDI testing for both wells on going,
2. Leak in system located and repaired by
DCWWA staff.
Note: All testing aspects are in compliance.
Pinebrook
Average Daily Sew er Production 1
2,0007,000
12,00017,00022,00027,000
January April July October
2018
2019
2020
Quaker Hill Water
Average Daily Water Production 1
015,00030,00045,00060,00075,00090,000
January April July October
2018
2019
2020
Rokeby (Zone F)
JAN FEB MAR APR MAY JUN
6,800 6,500 6,600 7,100 8,300 7,600
JUL AUG SEP OCT NOV DEC
7,000 6,500 6,600 6,500 6,500 6,400
Schreiber (Zone E)
JAN FEB MAR APR MAY JUN
2,800 1,800 2,000 2,100 2,400 2,900
JUL AUG SEP OCT NOV DEC
2,700 2,600 2,500 2,200 2,200 2,000
Status of Current Work Items:
1. Sulphur smell in the drinking water.
Note: All testing aspects are in compliance.
Status of Current Work Items:
1. Well #2 out of service due to low yeild
and quallity of water.
2. High RAD's sample result. Standard
monitouring will require additional
sampling.
Rokeby
Average Daily Water Production 1
5,0006,0007,0008,0009,000
10,000
January April July October
2018
2019
20203
Schreiber
Average Daily Water Production 1
1,0001,900
2,8003,7004,600
January April July October
2018
2019
2020
Shore Haven (Zone J)
JAN FEB MAR APR MAY JUN
17,800 17,700 18,000 18,800 19,700 21,600
JUL AUG SEP OCT NOV DEC
23,900 23,100 20,100 18,400 18,600 18,400
JAN FEB MAR APR MAY JUN
108,000 106,000 114,800 135,000 139,500 118,000
JUL AUG SEP OCT NOV DEC
133,000 139,300 146,900 139,600 119,000 110,800
Staatsburg (Zone C)
Status of Current Work Items:
1. Valve inspections for River Ridge. Cont.
2. Leak located and repaired in system.
3. Main Break repaired on 4/3 @ 37 Elm St.
Note: All testing aspects are in compliance.
Status of Current Work Items:
1. Softener performance under evaluation.
2. RPZ installed on backwash line as
directed by DOH. Awaiting design approval.
3. Wells 2+3 running together.
Note: All testing aspects are in compliance
With the exception of Gross Alpha.
Notification is being reviewed by DOH.
Shore Haven
Average Daily Water Production 1
10,00015,00020,00025,00030,000
January April July October
2018
2019
2020
Staatsburg
Average Daily Water Usage 1
95,000115,000135,000155,000175,000195,000215,000235,000
January April July October
2018
2019
2020
Valley Dale Water
JAN FEB MAR APR MAY JUN
28,900 37,500 41,600 35,600 44,000 28,700
JUL AUG SEP OCT NOV DEC
30,200 25,000 34,000 21,600 23,100 24,000
Valley Dale WW (S.D. #2)
JAN FEB MAR APR MAY JUN
31,093 31,022 25,144 32,168 25,116 30,769
JUL AUG SEP OCT NOV DEC
22,024 14,100 13,684 14,434 25,813 40,019
Status of Current Work Items:
1. Well #3, #8 out of service
2. High flow represents possible leak. Leak
located at 298 Forest Valley Rd.
Note: All testing aspects are in compliance.
Status of Current Work Items:
1. I&I study needed.
2. BOD exceedance due to high flows and
flow management. Adjustments made to
flow through at STP and de-chlor chemical.
Full review of operations in process.
Valley Dale Wastewater
Average Daily Flow 1
5,00015,00025,00035,00045,00055,000
January April July October
2018
2019
2020
Valley Dale Water
Average Daily Water Production 1
20,000
30,000
40,000
January April July October
2018
2019
2020
Vanderburgh Cove Sewer North
JAN FEB MAR APR MAY JUN
861 1,748 2,376 1,535 1,094 1,247
JUL AUG SEP OCT NOV DEC
2,138 2,527 806 1,706 2,236 3,425
Vanderburgh Cove Sewer South
JAN FEB MAR APR MAY JUN
2,028 2,090 2,168 2,171 2,424 723
JUL AUG SEP OCT NOV DEC
795 1,895 2,796 2,923 3,265 4,249
Status of Current Work Items:
1. Flow meter accuracy under review. Spot
check and zero calibration perfomed weekly.
Re-configuring of flow insert completed.
2. Review of operations on-going.
Status of Current Work Items:
1. Review of operations on-going.
Vanderburgh Cove South
Average Daily Sew er Production 1
500
5,500
10,500
15,500
January April July October
2018
2019
2020
Vanderburgh Cove North
Average Daily Sew er Production 1
100
4,100
8,100
12,100
January April July October
2018
2019
2020
Tivoli Water
JAN FEB MAR APR MAY JUN
77,490 70,830 74,350 77,150 82,480
JUL AUG SEP OCT NOV DEC
82,840 74,690 81,760 78,200 69,290 73,510
Tivoli Sewer
JAN FEB MAR APR MAY JUN
69,000 69,000 108,000 120,000 120,000
JUL AUG SEP OCT NOV DEC
62,000 74,000 43,000 84,000 87,100 100,000
Additional Notes/Comments:
Status of Current Work Items:
1. Sample plan under review.
2. Water main replacement, engineering
under way.
3. Well field improvement project in
progress.
4. Lead service line survey completed
5. Storage tank replacement bids awarded
Status of Current Work Items:
1. High flow continues, due to I&I. Study on
going.
2. Operations and process under review.
3. Reed bed maintenance needed.
4. Generator is O.S., needs to be repaired.
5. Truck replacement in progress
6. Cross training for ops in progress.
Tivoli
Average Daily Water Production 1
1,00021,00041,00061,00081,000
January April July October
2018
2019
2020
Tivoli
Average Daily Sew er Production 1
1,00021,00041,00061,00081,000
January April July October
2018
2019
2020
Warrant: June 2020 Sum of Amount
Arbors Water $490.75
ABW20013
Byrnes Message Bureau, Inc.
Answering service: May 2020 $173.31
ABW20014
Dig Safely New York, Inc.
May 2020 $203.56
ABW20015
Byrnes Message Bureau, Inc.
Answering service: June 2020 $113.88
Birch Hill Water $6,888.14
BHW20021
Protective Power Systems & Controls, Inc.
Generator Major service May 2020 $4,525.00
BHW20022
Frontier Communications
Telephone service: 5/25/20- 6/24/20 (227 6847) $74.93
BHW20023
USA BlueBook
PhosVer 3/Hach DPD 1/Reagent Iron Ferrover/Ascorbic Acid $249.38
BHW20024
Environmental Consultants, LLC
Monthly operations: May 2020 $2,038.83
Central Dutchess Water Transmission Line $172,367.10
CDW20090
Paychex, Inc.
Administrative Services: Pay Period ending 5/8/20 $14.58
CDW20091
VERIZON.
Telephone service: 5/4/20-6/3/20 (471-0917) $258.38
CDW20092
Home Depot Credit Services
April 2020 purchases $13.97
CDW20093
Electro Control Supply, INC
Yaskawa key pad $150.00
CDW20094
Surpass Chemical Company, Inc.
Chemicals: Sodium Hypochlorite plus Deposit $279.00
CDW20095
MVP Health Care, Inc.
June 2020 Health Insurance $2,300.96
page 1 of 15
CDW20096
MetLife-Group Benefits
Dental Benefits: June 2020 $82.48
CDW20097
Central Hudson Gas & Electric
Elecectric/Gas Service: April 2020 (Summary Billing: 50624675000
56852136011/2135013) $1,934.16
CDW20098
Recycle Depot
Monthly Refuse removal: June 2020 $31.99
CDW20099
Time Warner Cable
Internet service: 5/19-6/18/20 (8150 41 015 0093567) $133.04
CDW20100
Protective Power Systems & Controls, Inc.
Generator Major service May 2020 $600.00
CDW20101
Eye Med Fidelity Sec Life Ins NY
June 2020 Eye Insurance $18.47
CDW20102
DC Commissioner of Finance
Postage: April 2020 $2.97
CDW20103
OPTIMUM
Internet service: 5/23-6/22/20 (07883-633683-02-8) $152.38
CDW20104
Paychex, Inc.
Administrative Services: Pay Period ending 5/22/20 $14.58
CDW20105 *
TTI Environmental Incorporated
Decommissioning of 2 Aboveground Storage Tank System $15,518.00
CDW20106
Core & Main
Bonnet Gasket $117.16
CDW20107
Wex Inc.
Fuel for vehicles: May 2020 $172.12
CDW20108
Dig Safely New York, Inc.
May 2020 $135.85
CDW20109
Steve B's
AF 8609: Replace Master Cylinder AF 8618: Oil change/Tire rotation $228.50
CDW20110
TTI Environmental Incorporated
Decommissioning of 2 Aboveground Storage Tank System $4,014.00
Warrant: June 2020 page 2 of 15
CDW20111
Davies Hardware
Supplies: May 2020 $32.99
CDW20112 *
City of Poughkeepsie
Water: April 2020 $135,886.50
CDW20113
HRR Industries, Inc.
HVAC Service Call: Installation of new exhaust fan motor $1,087.50
CDW20114
H.G. Page & Sons, Inc.
Steel Fitting Brush $3.99
CDW20115
NYS & Local Emp. Ret. System
Retirement System Monthly Reporting: May 2020 $263.49
CDW20116
City of Poughkeepsie
Water: April 2020 (Capital Charge) $8,920.04
Chelsea Cove Sewer $8,564.99
CCS20035
Frontier Communications
Telephone service: 5/7/20 - 6/6/20 (226-5492) $59.35
CCS20036
Recycle Depot
Monthly Refuse removal: June 2020 $357.98
CCS20037
NYSEG
Electric service: 4/17/20 - 5/11/20 (1001-0243-847) $1,109.68
CCS20038
Environmental Consultants, LLC
Monthly operations: May 2020 $5,537.98
CCS20039
Wilmington Trust
2014 Bond Fund Trustee services: 6/1/20 - 5/31/21 $1,500.00
Dalton Farms Sewer $16,280.06
DFS20042
VERIZON.
Telephone service: 5/7/20-6/6/20 (845 724 3574) Account # 451-783-984-0001-
12 $26.24
DFS20043
Frontier Communications
Telephone service: 5/7/20 - 6/6/20 (845-223-3038) $53.27
DFS20044
J.D. Johnson Company
PVC Pipe/Flanges/Nuts & Bults/Gasket $299.13
Warrant: June 2020 page 3 of 15
DFS20045
J.D. Johnson Company
Float Switch $146.02
DFS20046
J.D. Johnson Company
PVC Pipe Cement/Primer/Nipple/Clamp $109.47
DFS20047
J.D. Johnson Company
PVC Adapter $53.60
DFS20048
J.D. Johnson Company
PVC Ball Valve/Check Valve/Pipe/Bushing/Coupling/Tee $694.89
DFS20049
BrentWood Industries
Delivery of Polychem Chain and Flight Collection 3-Shaft System: Initial pmt part 2 $760.00
DFS20050
Earthcare
Sludge removal: 5/9: 15,000 gals $1,725.00
DFS20051
NYSEG
Electric service: 4/14/20 - 5/11/20: 1001-0243-581 $126.64
DFS20052
Frontier Communications
Internet service: 5/25/20-6/24/20 (145-196-0000-061990-7) $11.30
DFS20053
USA BlueBook
Quick Coupling Aluminum Adapter/Coupler/PVC Suction Hose $662.60
DFS20054
Environmental Consultants, LLC
Monthly operations: May 2020 $5,773.07
DFS20055
Davies Hardware
Supplies: May 2020 $171.98
DFS20056
Evoqua Water Technologies LLC
Hydrosand/Gasket Seal Strips/Screen Wire $5,336.25
DFS20057
Williams Lumber & Home Centers
May 2020 $222.06
DFS20058
Poughkeepsie Journal
Advertisement for Bid: DFS Clarifier Installation $108.54
Warrant: June 2020 page 4 of 15
Dalton Farms Water $2,041.39
DFW20019
Frontier Communications
Telephone service: 5/7/20 - 6/6/20 (223-7653) $35.38
DFW20020
Environmental Consultants, LLC
Monthly operations: May 2020 $2,006.01
Fairways Sewer $1,937.25
FAS20011
JCO Inc.
Monthly operations: May 2020 $425.25
FAS20012
Automatic Alarm Services INC.
Monitoring 7/2020-6/2021 $1,512.00
Fairways Water $793.99
FAW20010
JCO Inc.
Monthly operations: May 2020 $724.24
FAW20011
Surpass Chemical Company, Inc.
Checmicals: Sodium Hypochlorite plus Deposit $69.75
General $141,591.51
GEN20165
NYS Child Support Processing Center
Case # CA37071N1 PPE 05/08/2020 $421.00
GEN20166
NYS Deferred Compensation Plan
Deferred Compensation: Paydate 05/15/20 $2,435.00
GEN20167
Paychex, Inc.
Administrative Services: Pay Period ending 5/8/20 $182.22
GEN20168 C
Amazon Capital Services
COVID-19 Office Supplies: Printer/Tablets $998.85
GEN20169
VERIZON.
Fios: 5/5/20-6/4/20 (755-807-884-0001-96) $266.98
GEN20170 C
AccuFund, INC.
Consulting Services: April 2020 (Card X Import) $600.00
GEN20171
Paychex, Inc.
Administrative Services (Delivery Fee): Pay Period ending 4/10/20 $12.00
Warrant: June 2020 page 5 of 15
GEN20172
RBT CPA's, LLP
Audit/Accounting Services:
Final billing for Dec 31, 2019 Financial Statements
Preparation of 1099/1095 Forms $5,490.00
GEN20173
MVP Health Care, Inc.
June 2020 Health Insurance $7,708.22
GEN20174
MetLife-Group Benefits
Dental Benefits: June 2020 $1,805.03
GEN20175
Central Hudson Gas & Electric
Electric/Gas Service: April 2020 (Summary Billing: 5699-0010-00-3) $5,264.30
GEN20176
AFLAC
Insurance Coverage: May 2020 $106.54
GEN20177
Upstate Concrete & Masonary Contracting C., Inc
1 LaGrange Ave Parking Lot Renovations Payment application #6 - FINAL $3,865.00
GEN20178
Verizon Wireless
Telephone service: 4/13/20-5/12/20 (cell and modem) $187.02
GEN20179
NYS Child Support Processing Center
Case # CA37071N1 PPE 05/22/2020 $421.00
GEN20180
Eye Med Fidelity Sec Life Ins NY
June 2020 Eye Insurance $296.67
GEN20181
NYS Deferred Compensation Plan
Deferred Compensation: Paydate 05/29/20 $2,435.00
GEN20182 *
Employee Benefits Division
Health Insurance Premium: June 2020 $32,338.24
GEN20183
DC Commissioner of Finance
Print Shop/Storeroom: April 2020 $432.14
GEN20184
DC Commissioner of Finance
Postage: April 2020 $750.91
GEN20185
DC Commissioner of Finance
Computer Services: April 2020 $900.00
GEN20186
Paychex, Inc.
Administrative Services: Pay Period ending 5/22/20 $182.22
Warrant: June 2020 page 6 of 15
GEN20187 *
Rose and Kiernan, Inc.
2020 Policy Premium: Commercial package/Prof Liab/Umbrella/July 2020
(Includes COVID-19 Premium Credit) $16,515.36
GEN20188 C
Corey, Jr., Donald A
Reimbursement for May Mileage $72.95
GEN20189 C
New York Rural Water Assoc.
Disposable Facemasks $62.50
GEN20190
Ulster Uniform Service, Inc.
Uniforms: May 2020 $66.00
GEN20191
DC Commissioner of Finance
Copier/Telephone Service: April 2020 $573.38
GEN20192
Chickery's Auto Repair
AF 8613: NYS Inspection $21.00
GEN20193
RBT CPA's, LLP
Accounting Services: Consultation and review of various documents $5,541.50
GEN20194 C
Amazon Capital Services
COVID-19 Office Supplies: Tablet/Tablet Covers $325.91
GEN20195 C
Lenovo Inc.
ThinkPad L390 Laptops (2)
Aggregate Hardware Buy 18-01 (contract # MC00019649) $1,635.90
GEN20196
NYS & Local Emp. Ret. System
Retirement System Monthly Reporting: May 2020 $4,332.67
GEN20197
UPS
4-3 Package Adjustment/5-15 6 Board Packets/5-20 & 5-21 Next Day Air Packages $76.84
GEN20198
Van DeWater & Van DeWater, LLP
Professional services: Jeffery Groves Estates $220.00
GEN20199
Rose and Kiernan, Inc.
Add Auto NY Mutual Aid Endorsement Eff 5/27/20 $121.00
GEN20200
Paychex
Section 125/stratustime $163.40
Warrant: June 2020 page 7 of 15
GEN20201 *
NYSIF
Workers Comp 7/1/20 - 7/1/21 $43,223.19
GEN20202
Poughkeepsie Journal
Public Notices: May & June Board Mtg June Special Board Mtg 6/5/20 $67.82
GEN20203
Drake, Loeb, Heller, etal.
Professional services: Red Hook Acres/Hoffman water $1,473.75
Greenfields Sewer $21,901.67
GFS20021
JCO Inc.
Monthly operations: May 2020 $4,066.37
GFS20022
USA BlueBook
Reagent Iron Ferrover/Sodium Periodate $183.11
GFS20023
J.D. Johnson Company
Black Gloves $89.94
GFS20024
Earthcare
Sludge removal: 5/27: 7,000 gals $805.00
GFS20025
T&B Engineering, PC
CA Services: Greenfields Sewer WWTP Rehab
Project # 130280010A
Services 3/29/20 - 4/25/20 $5,492.00
GFS20026
T&B Engineering, PC
Professional Services: Greenfield Sewer WWTP Rehab
Project # 13028010
GFS2016-01
Services 3/29/20 - 4/25/20 $4,851.25
GFS20027
T&B Engineering, PC
Professional Services: Greenfield Sewer Collection System Rehab
Project #130280011A
PSA-GFS-2018-05
Services 3/29/20 - 4/25/20 $6,414.00
Greenfields Water $4,106.79
GFW20026
JCO Inc.
Monthly operations: May 2020 $1,950.12
Warrant: June 2020 page 8 of 15
GFW20027 E
Protective Power Systems & Controls, Inc.
Emergency Generator Load Bank Test $325.00
GFW20028
Lawn Masters of NY, LLC
Lawn Maintenance: May 2020 $1,831.67
Hyde Park Regional Water $187,245.00
HPR20139
Central Hudson Gas & Electric
Electric: 4/17/20-5/14/20 (5327-2710-00-4) $33.46
HPR20140
OPTIMUM
Internet service: 05/16/20-6/15/20 (07883-633542-01-8) $235.34
HPR20141
Chickery's Auto Repair
AZ 3653: NYS Inspection/Oil Change/Top off fluids $79.75
HPR20142
E.H. Wachs
Upper Gauge Template $39.42
HPR20143
M&O Sanitation, Inc.
Pumped and cleaned pump station by river $5,000.00
HPR20144
Sarjo Industries
Hex Cap Screws/Flat Washer/Brass Pipe Fitting $11.13
HPR20145
VERIZON.
Telephone service: 5/10-6/9/20 (229-1117/9233) $142.23
HPR20146
Central Hudson Gas & Electric
Electric Service: April 2020 (Summary Billing: 53242580008/53503800004
56171635016/3730013/4600017 56620730012/56640195006) $8,313.97
HPR20147
Amity Construction Corp
Curb Box Replacement: 4307 Rt. 9, 31 & 33 Terwilliger Rd. $4,222.00
HPR20148
Carmel Win Water Works
Curb Box/2 Hole Curb Stops/SS Rod $556.00
HPR20149 E
Amity Construction Corp
Emergency Water Leak Repair: 11 & 12 Albertson, Hyde Park $6,120.00
HPR20150
Verizon Wireless
Modem 4/24/20 - 5/23/20 (942053606-00001) $14.39
Warrant: June 2020 page 9 of 15
HPR20151
Core & Main
Compression tubing/Riser for Clow Medallion/Lugs/Rod/Coupling $1,119.28
HPR20152
Core & Main
Hymax Clamps $760.00
HPR20153
Core & Main
Risers and Lids $485.00
HPR20154
Wex Inc.
Fuel for vehicles: May 2020 $1,169.62
HPR20155
Amrex
Chemicals: Sodium Tripolyphosphate less Container Deposit Refund $4,000.00
HPR20156 E
Quincy Compressor, LLC
Superpulsator Compressor Motor w/Unloaders $1,772.02
HPR20157
Seaway Diving & Salv Co., Inc.
Diving Services for Bi-Annual Inspection and Cleaning of Raw Water Intake $4,089.00
HPR20158
Chickery's Auto Repair
AF 8607: R&R Dump body hydraulics - includes new dump body motor and
reservoir $997.35
HPR20159
Chickery's Auto Repair
AF 8607: Inspection/Oil Change/Fluid Topoff/R&R Body Clearance Light & Harness $178.10
HPR20160
NAPA
V-Belts/WD40 $74.81
HPR20161
Ulster Uniform Service, Inc.
Uniforms: May 2020 $170.00
HPR20162
Ross Valve Mfg. Co., Inc.
Annual service/maintenance:
Old Post Rd PRVS
Mulford Ave PRVS
Hughs Ave PRVS
Hillcrest Terrace Blow-off
South Tank Altitude Valve $2,016.96
HPR20163
J.D. Johnson Company
Type K Soft Copper $376.26
Warrant: June 2020 page 10 of 15
HPR20164
Surpass Chemical Company, Inc.
Chemicals: Sodium Hypochlorite w/Deposit $446.40
HPR20165 *
Saks Plumbing & Heating Corp.
HP Phase II Meter Installaction $133,410.40
HPR20166
Carmel Win Water Works
Clow Medallion Hydrant/Lug Kit $2,238.00
HPR20167
HRR Industries, Inc.
HVAC Maintenance: May (1st) $500.00
HPR20168
Armani Engineering Corp
Program Raw Low Flow Alarm /
Diagnose & Corrrect Issue with North Tank Antenna $1,980.00
HPR20169
New York Rural Water Assoc.
Water Quality Online Course (KU) $160.00
HPR20170
JCI Jones Chemicals, Inc.
Chemicals: Chlorine $899.91
HPR20171
AMTEC Tax Exempt Compliance
Arbitrage Report: HPW Series 1998 Service agreement bonds $500.00
HPR20172
Amity Construction Corp
Curb Box Replacement: 4214 Albany Post Rd. $4,576.00
HPR20173
Conway's Lawn & Power Equipmnt
Air Filters/Fuel Filters/Spark Plug/Filter Oil/Blade Set $177.44
HPR20174
Ross Valve Mfg. Co., Inc.
Repair of model 40WR pilot $380.76
Pinebrook Sewer $3,150.33
PBS20014
JCO Inc.
Monthly operations: May 2020 $3,150.33
Pinebrook Water $20,036.90
PBW20016
JCO Inc.
Monthly operations: May 2020 $1,281.74
PBW20017
Central Hudson Gas & Electric
Electric service: 4/17/20-5/15/20 (5664-0245-03-3) $570.66
Warrant: June 2020 page 11 of 15
PBW20018
Surpass Chemical Company, Inc.
Chemicals: Sodium Hypochlorite plus Deposit $139.50
PBW20019 *
MJ Engineering and Land Surveying, P.C.
Engineering Services: Pinebrook Water Interconnection
Project No: MJ1443.02
Services through 5/29/20 $18,045.00
Quaker Hill Water $3,291.36
QHW20011
JCO Inc.
Monthly operations: May 2020 $895.79
QHW20012
Surpass Chemical Company, Inc.
Checmicals: Sodium Hypochlorite plus Deposit $69.75
QHW20013
Amity Construction Corp
Water Leak Repair: 15 Guereny Drive $2,325.82
Rokeby Water $926.42
RKW20012
JCO Inc.
Monthly operations: May 2020 $724.24
RKW20013
Frontier Communications
Telephone service: 5/1/20-5/31/20 (758-9223) $62.68
RKW20014
Surpass Chemical Company, Inc.
Chemicals: Sodium Hypochlorite plus Deposit $139.50
Schreiber Water $722.88
DSW20010
JCO Inc.
Monthly operations: May 2020 $593.67
DSW20011
NYSEG
Electric service: 4/14/20 - 5/11/20 (1001-1912-549) $129.21
Shorehaven Water $5,535.81
SHW20043
JCO Inc.
Monthly operations: May 2020 $1,943.69
SHW20044
TAM Enterprises
Brine removal 4/16/20 3,000 gallons $477.00
Warrant: June 2020 page 12 of 15
SHW20045
TAM Enterprises
Brine removal 4/24/20 3,500 gallons $556.50
SHW20046
TAM Enterprises
Brine removal 5/1/20 3,000 gallons $477.00
SHW20047
Amrex
Chemicals: Ammonium Hydroxide $16.40
SHW20048
Surpass Chemical Company, Inc.
Chemicals: Sodium Hypochlorite plus Deposit $69.75
SHW20049
Slack Chemical Company, Inc.
Chemicals: Caustic Soda plus Deposit $279.50
SHW20050
TAM Enterprises
Brine removal 5/8/20 3,000 gallons $477.00
SHW20051
USA BlueBook
pH Buffer Pack $37.47
SHW20052
Dutchess Overhead Doors
Repair overhead garage door with Re-level and replacement slide lock $724.50
SHW20053
TAM Enterprises
Brine removal 5/14/20 3,000 gallons $477.00
Tivoli Sewer $3,163.74
TVS20035
Central Hudson Gas & Electric
Electric: 4/2/20-5/5/20: 5674-2100-011/40-017/50-016
4/1/20-4/30/20: 5834-3100-010 $1,116.62
TVS20036
Home Depot Credit Services
April 2020 purchases $384.22
TVS20037
Amrex
Chemicals: Liquid Sodium Bisulfite $144.00
TVS20038
Surpass Chemical Company, Inc.
Chemicals: Sodium Hypochlorite w/Deposit $446.40
Warrant: June 2020 page 13 of 15
TVS20039
T&B Engineering, PC
Engineering Services: Tivoli Wastewater Eval Support
Project # 130280006C
APSTA: ES-TVS-2019-12-12
Services 3/29/20 - 4/25/20 $1,072.50
Tivoli Water $17,217.66
TVW20047
Central Hudson Gas & Electric
Electric: 4/2/20-5/5/20: 5674-2155-015/160-015/200-019
4/2/20-5/4/20: 5835-2540-015 $480.39
TVW20048
Surpass Chemical Company, Inc.
Chemicals: Aluminum Sulfate w/Deposit less Deposit Returns $524.48
TVW20049
FRANK VOSBURGH & SONS, INC.
Hydrant Repair: Intersection of Boyd Hill and Clay Hill Road $1,600.00
TVW20050
Coon, Jr., Leslie A.
Reimbursement: Mileage Reimbursement during truck replacement waiting
period $1,035.29
TVW20051
MJ Engineering and Land Surveying, P.C.
Engineering Services: Tivoli Water Distribution System Improvements
Project No: MJ1443.01
PWC-TVW-2019-01
Services through 5/29/20 $4,610.00
TVW20052
T&B Engineering, PC
Engineering Services: Tivoli Water System Improvements
Project #: 130280006A
Services 3/29/20 - 4/25/20 $7,367.50
TVW20053
Trezza Farm, LLC
Trezza Lease Agreement: July 2020 $1,600.00
Valley Dale Sewer $8,975.52
VDS20020
JCO Inc.
Monthly operations: May 2020 $2,591.87
VDS20021
J.D. Johnson Company
Rubber Gloves $59.96
Warrant: June 2020 page 14 of 15
VDS20022
Protective Power Systems & Controls, Inc.
Generator Maintenance: Install new receptacle for block heater and battery
charger wires $250.00
VDS20023
USA BlueBook
pH Buffer Pack/Blue Water Flag/Green Sewer Flag $93.69
VDS20024
Earthcare
Sludge removal: CCS: 5/16: 14,000 gals VDS: 5/19: 38,000 gals $5,980.00
Valley Dale Water $4,246.56
VDW20016
JCO Inc.
Monthly operations: May 2020 $1,087.45
VDW20017 E
Protective Power Systems & Controls, Inc.
Generator Maintenance: Install new block heater $315.00
VDW20018 E
Amity Construction Corp
Emergency Water Leak Repair: 293 Forest Valley Road $2,822.13
VDW20019
USA BlueBook
Blue Water Flag $21.98
Vanderburgh Cove Sewer $2,435.39
VCS20015
JCO Inc.
Monthly operations: May 2020 $2,028.20
VCS20016
USA BlueBook
Replacement Glass Sample Tube for Hach Sample Cell Kit $69.19
VCS20017
CPE
Plotter Paper Roll/Printer Ribbon $338.00
Grand Total $633,911.21
Warrant: June 2020 page 15 of 15
RESOLUTION NO. 2020.06.C Authority Board - DCWWA
June 17, 2020 Meeting
APPROVAL OF WARRANT
______________________ offers the following resolution and moves its adoption:
Approval of warrant, as presented
Seconded by _________________________
Record of Vote: Aye Nay
Thomas LeGrand ___ ___
Vincent DiMaso ___ ___
Larry Knapp ___ ___
Rudy Vavra ___ ___
Michael Cotton ___ ___
DUTCHESS COUNTY WATER AND WASTEWATER AUTHORITY
DUTCHESS COUNTY, NEW YORK
2019 ANNUAL FINANCIAL INFORMATION AND
OPERATING DATA
As of December 31, 2019 (Unless otherwise noted)
1
CASH BASIS FINANCIAL RESULTS OF THE AUTHORITY The table below presents historic financial information on the Authority’s operation of the Water and Wastewater Systems presented on a cash basis. The figures below have been taken from page 16 of the Authority’s Audited Financial Statements for the fiscal year ending Decemeber 31, 2019. Information on the fiscal year ending December 31, 2017 can be found on page 16 of the Authority’s Audited Financial Statement for the fiscal year ending December 31, 2018.
2
REVENUE AND EXPENSES PRESENTED IN ACCORDANCE WITH GAAP The table below presents historic financial information on the Authority’s operation of the Water and Wastewater Systems presented on an accrual basis. The figures below have been taken from page 15 of the Authority’s Audited Financial Statements for the fiscal year ending Decemeber 31, 2019.
3
DEBT SERVICE OBLIGATIONS OF THE AUTHORITY The information below has been taken from page 32 of the Authority’s Audited Financial Statements for the fiscal year ending Decemeber 31, 2019. The Authority issues revenue bonds to finance the acquisition of systems and the cost of the capital renovations to those systems and to pay costs of issuance. Such debt has been issued under the following authorizations:
Trust Indenture
As of June 1, 1995, the Authority executed a trust indenture authorizing the issuance of debt for the purpose of acquiring a sewage facility. This trust indenture was amended in 2007 to authorize debt issued for Part County Sewer District #1. One supplemental trust indenture was authorized under terms similar to those described in the General Bond Resolution described below for Part County Sewer District #2.
As of November 1, 2017, the Authority executed a trust indenture authorizing the issuance of debt for the purpose of acquiring a sewage facility. One supplemental trust indenture for the Vanderburgh Cove Sewer System was authorized under terms similar to those described in General Bond Resolutions described below.
Special Bond Resolution
As of September 30, 1997, the Authority adopted a special bond resolution authorizing debt to be sold at private sale for the purpose of acquiring a privately held water system.
General Bond Resolutions As of June 1, 1998, the Authority adopted a General Water Bond Resolution which enabled the Authority to issue additional debt pursuant to supplemental resolutions without having to modify the form or general terms of the debt, referred to as additional parity debt. The Authority has issued twenty – one supplemental resolutions pursuant to this general bond resolution, authorizing debt issues in the years 1998, 1999, 2000, 2001, two issues in 2002, 2004, two issues in 2008 and two issues i n 2009, 2010, 2011, 2013, 2014, two issues in 2015, 2016, two issues in 2018 and one issue in 2019.
As of August 1, 2004, the Authority adopted a general bond resolution pertaining to the Part County Sewer District No. 3, which enabled it to issue bonds to finance the purchase of the Dalton Farms Sewer System.
As of December 16, 2015, the Authority adopted a general bond resolution pertaining to the Pinebrook Sewer District No. 7, which enable it to issue bonds to finance the upgrades to Pinebrook Sewer District. As of February 15, 2017, the Authority adopted a general bond resolution pertaining to Greenfields Sewer District, which enabled it to issue bonds to finance the upgrades to Greenfields Sewer District.
4
Outstanding Debt and Debt Service Obligations*
Debt service requirements to maturity, less accreted interest, as of December 31, 2019 are as follows:
Year Ending
December 31, Principal Interest Total
2020 $2,047,750 $1,605,404 $3,653,154
2021 1,997,435 1,596,619 3,594,054
2022 1,881,777 1,739,590 3,621,367
2023 1,883,826 1,728,866 3,612,692
2024 1,857,453 1,714,484 3,571,937
2025-2029 6,815,562 8,466,463 15,282,025
2030-2034 3,442,189 4,157,058 7,599,247
2035-2039 3,370,260 4,057,376 7,427,636
2040-2044 2,755,188 703,523 3,458,711
2045-2049 1,033,100 50,038 1,083,138
Totals $27,084,540 $25,819,421 $52,903,961
Bond Issue Commitments The following long-term debt has been authorized by the Authority but remains unissued at December 31, 2019:
* The information below has been taken from page 35 of the Authority’s Audited Financial Statements for the fiscal year ending Decemeber 31, 2019.
ADDITIONAL INFORMATION
There are no changes to report in regards to any public authorities and local entities whose financial status may have a material impact on the financial status of the Dutchess County Water and Wastewater Authority and Dutchess County (the “County”).
Information regarding any public authorities and local entities that may affect the financial status of Dutchess County is provided in the County’s annual disclosure (See “Information Regarding County” herein.)
5
INFORMATION REGARDING THE AUTHORITY’S GOVERNMENT
EMPLOYMENT AND RETIREMENT SYSTEMS
The Dutchess County Water and Wastewater Authority is required to participate in the New York State Local Employees’ Retirement System and the Public Employees Group Life Insurance Plan System (Systems). These are cost sharing multiple employer retirement systems. The Systems provide retirement benefits as well as death and disability benefits. Obligations of employers and employees to contribute and benefits to employees are governed by the New York State Retirement and Social Security Law (NYSRSSL). As set forth in the NYSSRL, the Comptroller of the State of New York serves as sole trustee and administrative head of the Systems. The Comptroller shall adopt and may amend rules and regulations for the administration and transaction of the business of the Systems and for the custody and control of funds. The Systems issue publicly available financial reports that include an annual report and required supplementary information.
That report may be obtained by writing to the New York State and Local Retirement Systems, 110 State Street, Albany, New York 12244.
Information regarding the County’s Government Employment and Retirement Systems can be found within the County’s Annual Financial Statements. See “Information Regarding the County” herein.
Funding Policy
The systems are generally noncontributory. Tiers I-IV are noncontributory after ten years of participation and Tier V is required to contribute 3% of their salary. Tier VI is required to contribute a minimum of 3% of their salary. Under the authority of the NYSRSSL, the Comptroller shall certify annually the rates of participating employers expressed as proportions of payroll of members, which shall be used in computing the contributions required to be made by those employers to the pension accumulation fund.
The Dutchess County Water and Wastewater Authority is required to contribute to the System at an actuarially determined rate. The required contributions for the 2019 was $223,011, and for 2018 was $242,033, and for 2017 was $226,072. The Authority’s contributions made to the System were equal to 100% of the contributions required for those years.
6
INFORMATION REGARDING THE COUNTY
Certain information regarding Dutchess County’s financial and operating data for the fiscal year ending December 31, 2019 will be made available on MSRB’s Electronic Municipal Market Access (“EMMA”) website at http://emma.msrb.org.
Such information will include the County’s financial results, debt service obligations and authorizations, information regarding employment and retirement systems, and information regarding the County’s authorized financing activities. The County does not produce cash-basis results.
WATER AND SEWER:
Summary of Water Rate and Sewer Rent Changes Summary of Billings and Collections
SYSTEM
Rate
2018
Difference
2019
2019 Water *Billings/Collections
2019 Sewer
*Billings/Collections
Arbors Water System
Rate/1000 Gals
4.08
2.9%
4.20
46,835
Airport Water Line System
Rate/1000 Gals
6.11
-15.2%
5.18
16,280
Birch Hill Water System
Rate/1000 Gals
11.77
20.9%
14.23
83,233
Chelsea Cove Sewer System
Ann Fixed Rate
711.80
2.2%
727.76
363,577 Dalton Farms Sewer System
Rate/1000 Gals
6.33
3.3%
6.54
309,201
Dalton Farms Water System
Rate/1000 Gals
3.54
3.4%
3.66
177,418
Fairways Sewer System
Ann Fixed Rate
452.28
2.3%
462.84
16,595 Fairways Water System
Rate/1000 Gals
5.40
6.3%
5.74
39,151
Greenbush Water System
Ann Fixed Rate
357.80
2.1%
365.36
120,784
Greenfields Sewer System
Ann Fixed Rate
478.08
3.1%
492.93
142,193 Greenfields Water System
Rate/1000 Gals
5.84
34.6%
7.86
118,088
Hyde Park Water System-Zone A & B
Rate/1000 Gals
5.91
6.4%
6.29
1,416,803
Hyde Park Water System-Zone C
Rate/1000 Gals
5.91
6.4%
6.29
316,964
Hyde Park Water System-Zone D
Rate/1000 Gals
5.91
6.4%
6.29
212,051
Hyde Park Water System-Zone L
Rate/1000 Gals
5.91
6.4%
6.29
126,560
Pinebrook Sewer System
Ann Fixed Rate
611.49
4.2%
637.02
86,956 Pinebrook Water System
Rate/1000 Gals
5.70
9.1%
6.22
57,968
Quaker Hills Water System
Ann Fixed Rate
478.44
2.2%
489.00
54,825
Rokeby Water System
Rate/1000 Gals
9.95
2.0%
10.15
28,119
Schreiber Water System
Rate/1000 Gals
11.95
3.9%
12.42
20,214
Shore Haven Water System
Rate/1000 Gals
10.30
52.3%
15.69
107,592
Tivoli Sewer System
Rate/1000 Gals
-
-
5.89
98,158 Tivoli Water System
Rate/1000 Gals
-
-
7.44
148,116
Valley Dale Sewer System
Ann Fixed Rate
957.36
4.2%
997.16
121,543 Valley Dale Water System
Rate/1000 Gals
6.15
4.1%
6.40
71,483
Vanderburgh Cove Sewer System
Ann Fixed Rate
2,130.21
-17.2%
1763.82
71,974 Violet Avenue Water System
Rate/1000 Gals
2.58
1.9%
2.63
14,450
TOTALS
3,176,934
1,210,197
Collections* As noted on page 5 of the Authority’s Audited Financial Statements for the fiscal year ending December 31, 2019, through the establishment of the County Water District Zones of Assessment and the Part County Sewer Districts, the County has the ability to Relevy unpaid water or sewer bills. The Authority annually provides the County with a list and dollar amount for those properties in arrears. The County then places these amounts on the property tax bills for the following fiscal year and these amounts are then paid to the Authority. This places the Authority in the position of being at 100% collection of its water and sewer sales revenues.
7
CAPITAL IMPROVEMENT PROGRAMS
The following five pages show the Authority's 5-Year Capital Program as well as planned
equipment purchases for the next 5 years.
8
Report: Capital Improvement Plan
System/
Work Req Project Mgt Planning Design ConstructonBdgt Est Date Budget Est Funding NoteMgt B-I-C
Page 1 of 5
Phase
Bid
2020-2024Period:
Central Dutchess Tran Line $17,098,757 Fund Balance: $0
CDWTL Storage Report 20202017$17,098,757 Fund Balance/ Funding for evaluation through County 2019 budget.Project Management -
Chemical room heat 2020$0 Fund Balance/ Project Management -
2020
Replace Pump Station Roof (20 year cycle) 2020 20212019 Fund Balance/ Project Management -
Chelsea Cove Sewer $0 Fund Balance: $446,052
Generator Replacement 2020$0 Fund Balance/ Project Management -
Dalton Farms - Sewer $527,179 Fund Balance: $497,470
WWTP Secondary Settling Tank "B" Rehabilitation 2017$72,722 Fund Balance/ Ops to determine plan. Conceptual costOperations - Unit
2020
WWTP Sand Filter Rehabilitation Assessment 2017$19,460 Fund Balance/ Operations has done much of the work for this. Need to now get vendor for chem clean replacement (50% done)
Operations - Unit
2020
WWTP - Treatment Area - Ph. 3 - Unit Heater Replacement
20202017$285,798 Fund Balance/ Conceptual, assessment PFOperations - Unit
WWTP Plant Driveway Replacement & Plum Ct. Lift Station Sealing
20202017$1,900 Fund Balance/ Operations - Unit
WWTP Building - Replace Roof (20 year cycle) 20202017$147,299 Fund Balance/ combined contract w WTPOperations - Unit
Dalton Farms - Water $352,210 Fund Balance: $417,597
Meter Replacement 2021$303,743 Fund Balance/ Funding includes contribution from DFSProject Management -
2021
Seal WTP Driveway (5 year Cycle) 2017$3,500 Fund Balance/ Combined contract with WTPOperations - Unit
2021
WTP Building - Repair Exterior Damage & Paint (10 year cycle)
20202019$13,067 Fund Balance/ Operations - Unit
WTP Building - Replace Roof (20 year cycle) 20202017$26,133 Fund Balance/ Operations - Unit
Booster Pump Station Roof Replacement 20202015$5,767 Fund Balance/ Operations - Unit
Fairways - Sewer $8,500 Fund Balance: $24,823
Control Kiosks - Replace roofing 2017$3,400 Fund Balance/ Operations - Unit
2020
Wednesday, January 15, 2020$17,981,546Page :
System/
Work Req Project Mgt Planning Design ConstructonBdgt Est Date Budget Est Funding NoteMgt B-I-C
Report: Capital Improvement Plan Page 2 of 5
Phase
Bid
2020-2024Period:
Fairways - Sewer $8,500 Fund Balance: $24,823
Control Kiosk and Enclosures - Paint 2017$5,100 Fund Balance/ Operations - Unit
2020
Pump Replacement, Pit 1, P1 2020 Operations - Unit
2020
Pump Replacement, Pit 1, P2 2020 Operations - Unit
2020
Fairways - Water $69,929 Fund Balance: $78,721
WTP Building - Replace Roof (20 year cycle) 2017$11,600 Fund Balance/ Operations - Unit
2020
Seal Treatment Plant Pavement (5 year cycle) 2017$33,690 Fund Balance/ Operations - Unit
2020
Well 2 Assessment for Well Yield $10,000 Fund Balance/ flow sensorOperations - Unit
2020
WTP Building - Caulk & Coat Exterior Masonry (5 year cycle)
2017$8,700 Fund Balance/ Operations - Unit
2020
Repair/Replace Sectional Valves & Curb Stops 2017$5,939 Fund Balance/ proposed for 2017, have fundingOperations - Unit
2020
Piping Assessment 2020 4" threaded pipeOperations - Unit
Greenbush Water $94,520 Fund Balance: $52,604
Booster Station Evaluation 2017$11,120 Fund Balance/ RFP/Task Order for new studyProject Management -
2020
Pells Court Booster Station Improvements Evaluation
2017$83,400 Fund Balance/ Project Management -
2022
Greenfields Sewer $6,500,400 Fund Balance: $1,803
Wastewater Treatment Plant Replacements & Repairs
20202020$6,000,000 Fund Balance/Grant - NYS WIIA/EFC Market Rate Loan/
FB for Engineering; Applic. For EFC Market RateProject Management -
2020
I&I repairs 2017$500,400 Fund Balance/Grant - NYS WIIA/EFC Market Rate Loan/
Evaluation Report, decide direction get RFPAuthority2020
Greenfields Water $1,673,560 Fund Balance: $126,400
Piping Modifications at Plant 20202017$5,560 Fund Balance/ emergency repairs, develop planProject Management -
2020
Treatment System Improvements - Fe, Mn removal 20202017$1,668,000 Fund Balance/ Project Management -
Wednesday, January 15, 2020$8,343,509Page :
System/
Work Req Project Mgt Planning Design ConstructonBdgt Est Date Budget Est Funding NoteMgt B-I-C
Report: Capital Improvement Plan Page 3 of 5
Phase
Bid
2020-2024Period:
Harbor Hills Water $51,657 Fund Balance: $0
Booster Pp. Station Electrical Service Replacement 2017$51,657 Fund Balance/ conceptual costOperations - Unit
2020
HPW Distribution Sys Fund Balance: $0
Phase 2 meters -Zone A&B, Zone L, D, Staatsburg (Zone C)
2020 Project Management -
2020
HPW Water Treatment Plant $791,363 Fund Balance: $0
Clean & Coat Trt. Water Building Roof (5 year cycle)
2017$31,696 Unfunded Roof replaced 2014Operations - Unit
2020
Clean & Coat Treatment Building Roof (5 year cycle)
2016$38,488 Unfunded Roof Replaced 2012Operations - Unit
2020
Repair & Seal Raw Water Pump House Pavement (5 year cycle)
2013$2,264 Unfunded Operations - Unit
2020
Seal Water Treatment Plant Pavement (5 year cycle)
2017$39,620 Unfunded Operations - Unit
2020
HRP Capacity / Demand Analysis 2020 consider all future connection expansionsProject Management -
Raw Water Intake Improvements - Frazil Ice 20202017$27,970 Unfunded Pending further review of optionsProject Management -
2021
2021-2025 I&C Upgrades 20212017$651,325 Unfunded Based on T&B ReportProject Management -
2022
Pine Brook - Sewer $38,920 Fund Balance: $52,457
Collection System Inspection/Repair 20202017$38,920 Fund Balance/ Authority
Pine Brook - Water $3,489,161 Fund Balance: $149,711
Interconnection to HPR Study/Demo Old Plant 20202017$3,489,161 Fund Balance/Grant - NYS WIIA/EFC Market Rate Loan/
decide direction get RFPProject Management -
2022
Quacker Hill Water $1,024,352 Fund Balance: $50,771
Treatment Facility Replacement 20202017$1,007,472 Fund Balance/ Includes generator replacement, need NYSDEC decision on wetland rebuild
Operations - Unit
2021
Well #1 modifications 20202017$16,880 Fund Balance/ Extend/replace casing, add pitless adapter (Part of Treatment Facility Replacement)
Operations - Unit
2021
GWUDI Assesment 2020 2020 Operations - Unit
Wednesday, January 15, 2020$5,395,453Page :
System/
Work Req Project Mgt Planning Design ConstructonBdgt Est Date Budget Est Funding NoteMgt B-I-C
Report: Capital Improvement Plan Page 4 of 5
Phase
Bid
2020-2024Period:
Rokeby Water $167,329 Fund Balance: $51,140
WTP Building - Replace Roof (20 year cycle) 2017$8,700 Fund Balance/ No Capital Project to replace existing buildingProject Management -
2020
HP Tank Replacement 20202017$149,929 Fund Balance/ Project Management -
2021
WTP Building - Caulk & Coat Exterior Masonry (5 year cycle)
20202017$8,700 Fund Balance/ No Capital Project to replace existing buildingProject Management -
Schreiber - Water $19,028 Fund Balance: $28,700
Well 2 Assessment for Well Yield $10,000 Fund Balance/ silt in pump, possible rehab well or new well., well 3 has been reliable
Project Management -
2021
Meter Replacement 2017$9,028 Fund Balance/ Project Management -
2020
Shorehaven Water $10,000 Fund Balance: $42,100
Yanarella Section - Shallow Pipe Assessment 2020 2022$10,000 Fund Balance/ evaluate existing docs for pipe depthsOperations - Unit
Tivoli Sewer $1,337,568 Fund Balance: $215,200
Wastewater Plant 2020 20212017$1,337,568 Fund Balance/Grant - NYS WIIA/EFC Hardship Loan/
Project Management -
2022
Tivoli Water $4,750,000 Fund Balance: $149,881
Tank 2020$2,700,000 Fund Balance/Grant - NYS WIIA/EFC Hardship Loan/
Project Management -
2020
Wells and Wellfields 2020$550,000 Fund Balance/Grant - NYS WIIA/EFC Hardship Loan/
Project Management -
2020
Distribution System 20202020$1,500,000 Fund Balance/Grant - NYS WIIA/EFC Hardship Loan/
Project Management -
2021
Valley Dale - Sewer $9,000 Fund Balance: $47,331
Dechlor Study 2020 Operations - Unit
WWTP Building - Caulk & Coat Exterior Masonry (5 year cycle)
2020 20202017$9,000 Fund Balance/ Operations - Unit
2021
Valley Dale - Water $1,430,444 Fund Balance: $254,982
Meter Replacement 2017$82,876 Fund Balance/ Project Management -
2021
Pressure Tank Replacement Design 2020$10,000 Fund Balance/ leaking/VFD's, can pressure tank be eliminatedOperations - Unit
Wednesday, January 15, 2020$6,385,801Page :
System/
Work Req Project Mgt Planning Design ConstructonBdgt Est Date Budget Est Funding NoteMgt B-I-C
Report: Capital Improvement Plan Page 5 of 5
Phase
Bid
2020-2024Period:
Valley Dale - Water $1,430,444 Fund Balance: $254,982
Storage Tank Replacement Design 2020$1,337,568 Fund Balance/ Need to select option, prepare Eng'g. Report, replace 2 tanks
Project Management -
2020
Violet Ave - Water $11,120 Fund Balance: $37,121
Booster Station Evaluation 20202017$11,120 Fund Balance/ RFP/Task Order for new study - also GreenbushProject Management -
2022
$39,454,997Plan Total:
Wednesday, January 15, 2020$1,348,688Page :
TO: Authority Board
FROM: Bridget Barclay
DATE: June 10, 2020
RE: Draft 2021 County Division of Water Resources Budget Request
Please find attached the Draft Summary and supporting Figures for the 2021 County Budget
Request for the Division of Water Resources. Our preliminary budget request will be submitted
to the County on or before June 25th. Budget reviews with the Executive Department occur in
August.
Please recall that the County Division of Water Resources Budget provides only a very small
portion of the overall operating budget for the Authority, specifically for those functions related
to community assistance, County liaison work, preliminary project evaluation and development,
and water resource management. The remainder of the Authority’s operating budget is funded
by system revenues and project financing.
Due to financial impacts of the COVID 19 pandemic, the County Budget Office is directing that
all departments and divisions submit a baseline, lowest minimal cost for providing critical
programs and services. Additionally, options are to be submitted for two levels of reductions
to the baseline budget.
We are proposing to submit a budget to the County Budget Office that shows a 69% decrease in the Division of Water Resources’ total net cost to County from $134,875 in 2020 to $42,375 in 2021. This is due to a decrease in requested staff support from $122,500 to $30,000. In compliance with the County’s directive, this provides minimal County support for ongoing activities related to the Poughkeepsie Joint Storage Feasibility Study and the Rhinebeck Water and Sewer Transfer Evaluation Study. The two requested budget reductions would reduce the staff support to $15,000 and to $0, respectively.
A brief description of the County Revenue and Expenditure Categories:
Summary (Fig. 1)
We have eliminated the rent payment (beginning in 2019), as we are no longer housed in a
County building.
Note that the Return of Net County Service Fee payment is presented for information purposes,
but is not a component of the County’s nor the Division of Water Resources’ annual operating
budget. The payment is processed through the annual benefit assessment levy. Due to an
increase in debt service expenses for the Hyde Park Water System (Zones of Assessment A and
B), no Net County Service Fee is anticipated for 2021.
Professional/Contractual Services – Since 2010 this expense category has included only
funding for Authority Staff Support. These funds are used to fund Authority staff positions, in
support of general water resource management, community assistance, County liaison work
and preliminary project evaluation and development work. The 2020 budget as approved
provided a base of $112,500 with an allowance of an additional $10,000 for reimbursable
Partnership for Manageable Growth program costs. As noted above, we are proposing to
request $30,000 for 2020.
Attached figures show the County Staff Support History (Fig. 2), County Staff Support Levels by
Position (Fig. 3), and the preliminary projected Impact of Salary/Benefit Increases on all Cost
Center areas including County support (Fig. 4.) Salary costs reflect no cost of living increase (in
keeping with the current CSEA Contract), and merit and longevity in accordance with the 2020
approved Salary Policy and Schedule.
Division of Water Resources
BUDGET HISTORYFigure 1 - Summary
Approved Actual Proposed Approved Proposed2019 2019 2020 2020 2021
Expenditure Category
Professional/Contractual Services (1) $112,500 $112,500 $130,000 $122,500 $30,000
Service Fees (CDWTL Capital Reserve) $12,375 $12,375 $12,375 $12,375 $12,375
TOTAL $124,875 $124,875 $142,375 $134,875 $42,375
Revenue Category
Rent Payment $0 $10,000 $0 $0 $0
Return of Prior Year's Expenses (2) $140,144 $147,786 $0 $0 $0
TOTAL $140,144 $157,786 $0 $0 $0
NET COUNTY BUDGET REQUEST -$15,269 -$32,911 $142,375 $134,875 $42,375
NOTES:(1) 2020 Professional Services is a base of $112,500 with an allowance of $10,000 reimbursable for the Partnership for Manageable Growth Program.
Division of Water Resources
BUDGET HISTORYFigure 2 - County Staff Support History
Approved Proposed2017 2018 2019 2020 2021
Total County Staff Support $105,000 $105,000 $112,500 $122,500 $30,000
Total Authority Staff Costs (1) $2,258,775 2,392,015$ $2,598,691 2,733,838$ 2,755,800$
County Salary Support as a % of Total 4.65% 4.39% 4.33% 4.48% 1.09%
NOTES(1) Total Authority Staff Costs for 2021 is estimated.
Division of Water Resources
BUDGET HISTORYFigure 3 - County Staff Support by Position
2019 2020 2021Position Actual Approved Proposed
Executive Director 20% 20% 10%
Deputy Director 7.5% 7.5% 0%
Project Manager 15% 15% 5%
Project Facilitator 1 19.5% 19.5% 5%
Project Facilitator 2 19% 19.5% 0%
Note: We receive no County support for the 19 additional Authority positions.
Percent County Salary Support
Division of Water Resources
2021 Draft DOWR Budget
Figure 4 - Impact of Salary/Benefit Increases on All Cost Centers
2020 2021 % of TotalCost Center Approved Proposed Increase % Increase Expense
County $122,500 $30,000 -$92,500 -75.5% 1.1%
Authority Systems $2,543,871 $2,656,646 $112,775 4.4% 96.4%
Benefit Assessment $67,467 $69,154 $1,687 2.5% 2.5%
TOTAL $2,733,838 $2,755,800 $21,962 0.8%
2021 Total Staff Cost Estimate assumes no Cost of Living Increases
RESOLUTION NO. 2020.6. D Authority Board – DCWWA
June 17, 2020 meeting
AWARD OF THE CLARIFIER INSTALLATION CONTRACT AT
DALTON FARMS WASTEWATER SYSTEM
_______________ offers the following resolution and moves its adoption:
WHEREAS, the Dutchess County Water and Wastewater Authority (Authority) received proposals
between May 20, 2020 and June 8, 2020 for the installation of the second Polychem clarifier sludge
collection system in the Dalton Farms Wastewater district in accordance with the Authority’s procurement
policy for public works with a contract value less than or equal to $35,000.00 as follows:
Proposer Amount
1. Eventus Construction Co., Inc., Amawalk, NY $60,000.00
2. TAM Enterprises Inc., Goshen, NY $60,000.00
3. P.K. Songer Plumbing, Montgomery, NY $26,400.00
WHEREAS, Staff has subsequently reviewed the proposals received and recommends award to P.K. Songer
Plumbing; and
WHEREAS, the Board has reviewed the recommendation of the staff and considered the benefits to the
Authority,
THEREFORE, BE IT RESOLVED THAT; the Board hereby authorizes the Executive Director or Deputy
Director to execute a contract with P.K. Songer Plumbing for the price of $26,400.00.
Seconded by _________________________
Record of Vote: Aye Nay
Thomas LeGrand ___ ___
Vincent DiMaso ___ ___
Larry Knapp ___ ___
Rudy Vavra ___ ___
Michael Cotton ___ ___
RESOLUTION NO. 2020.06.E Authority Board – DCWWA
June 17, 2020 Meeting
OPEN EXECUTIVE SESSION
______________________ offers the following resolution and moves its adoption:
Enter into Executive Session for the purpose of ______________________________.
Seconded by _________________________
Record of Vote: Aye Nay
Thomas LeGrand ___ ___
Vincent DiMaso ___ ___
Larry Knapp ___ ___
Rudy Vavra ___ ___
Michael Cotton ___ ___
RESOLUTION NO. 2020.06.F Authority Board – DCWWA
June 17, 2020 Meeting
CLOSE EXECUTIVE SESSION
______________________ offers the following resolution and moves its adoption:
Close Executive Session and return to public session
Seconded by _________________________
Record of Vote: Aye Nay
Thomas LeGrand ___ ___
Vincent DiMaso ___ ___
Larry Knapp ___ ___
Rudy Vavra ___ ___
Michael Cotton ___ ___